WorldWideScience

Sample records for project cost tpc

  1. ALICE Time Projection Chamber (TPC) Readout Sector in Lab

    CERN Multimedia

    2003-01-01

    The Time Projection Chamber (TPC) is the main particle tracking detector in ALICE. Charged particles crossing the gas of the TPC knock electrons out of their atoms, which drift in the eletric field. By measuring the arrival of electrons at the end of the chamber, at segments such as the one shown here, the TPC will reconstruct the paths of the original charged particles.

  2. Prototype of the ALICE Time Projection Chamber (TPC) Field-Cage

    CERN Multimedia

    2003-01-01

    The ALICE Time Projection Chamber (TPC) is the main particle tracking detector in ALICE. Charged particles crossing the gas of the TPC knock electons out of their atoms, which then drift in in the electric field. By measuring the arrival of electrons at the end of the chamber, the TPC will reconstruct the paths of the original charged particles.

  3. Readout system of TPC/MPD NICA project

    Energy Technology Data Exchange (ETDEWEB)

    Averyanov, A. V.; Bajajin, A. G.; Chepurnov, V. F.; Cheremukhina, G. A.; Fateev, O. V.; Korotkova, A. M.; Levchanovskiy, F. V.; Lukstins, J.; Movchan, S. A.; Razin, S. V.; Rybakov, A. A.; Vereschagin, S. V., E-mail: vereschagin@jinr.ru; Zanevsky, Yu. V.; Zaporozhets, S. A.; Zruyev, V. N. [Joint Institute for Nuclear Research (Russian Federation)

    2015-12-15

    The time-projection chamber (TPC) is the main tracking detector in the MPD/NICA. The information on charge-particle tracks in the TPC is registered by the MWPG with cathode pad readout. The frontend electronics (FEE) are developed with use of modern technologies such as application specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), and data transfer to a concentrator via a fast optical interface. The main parameters of the FEE are as follows: total number of channels, ∼95 000; data stream from the whole TPC, 5 GB/s; low power consumption, less than 100 mW/ch; signal to noise ratio (S/N), 30; equivalent noise charge (ENC), <1000e{sup –} (C{sub in} = 10–20 pF); and zero suppression (pad signal rejection ∼90%). The article presents the status of the readout chamber construction and the data acquisition system. The results of testing FEE prototypes are presented.

  4. Progress on the superconducting magnet for the time projection chamber experiment (TPC) at PEP

    International Nuclear Information System (INIS)

    Green, M.A.; Eberhard, P.H.; Burns, W.A.

    1980-01-01

    The TPC (Time Projection Chamber) experiment at PEP will have a two meter inside diameter superconducting magnet which creatests a 1.5 T uniform solenoidal field for the TPC. The superconducting magnet coil, cryostat, cooling system, and the TPC gas pressure vessel (which operatests at 11 atm) were designed to be about two thirds of a radiation length thick. As a result, a high current density coil design was chosen. The magnet is cooled by forced flow two phase helium. The TPC magnet is the largest adiabatically stable superconducting magnet built to date. The paper presents the parameters of the TPC thin solenoid and its subsystems. Tests results from the Spring 1980 cryogenic tes are presented. The topics to be dealt with in the paper are cryogenic services and the tests of magnet subsystems such as the folded current leads. Large thin superconducting magnet technology will be important to large detectors to be used on LEP

  5. Development of a time projection chamber using gas electron multipliers (GEM-TPC)

    International Nuclear Information System (INIS)

    Oda, S.X.; Hamagaki, H.; Ozawa, K.; Inuzuka, M.; Sakaguchi, T.; Isobe, T.; Gunji, T.; Morino, Y.; Saito, S.; Yamaguchi, Y.L.; Sawada, S.; Yokkaichi, S.

    2006-01-01

    We developed a prototype time projection chamber using gas electron multipliers (GEM-TPC) for high energy heavy ion collision experiments. To investigate its performance, we conducted a beam test with three kinds of gases (Ar(90%)-CH 4 (10%), Ar(70%)-C 2 H 6 (30%) and CF 4 ). Detection efficiency of 99%, and spatial resolution of 79μm in the pad-row direction and 313μm in the drift direction were achieved. The test results show that the GEM-TPC meets the requirements for high energy heavy ion collision experiments. The configuration and performance of the GEM-TPC are described

  6. Some TPC [Time Projection Chamber] measurements in an oxygen beam at the AGS

    International Nuclear Information System (INIS)

    Love, W.A.; Bonner, B.E.; Buchanan, J.A.

    1988-01-01

    The principal detector for AGS Experiment 810 is a Time Projection Chamber (TPC) in which it is intended to measure momenta and angles of a major fraction of the charged particles from each light ion collision. This report describes the results of a test of a prototype of the TPC in a beam of (14.6 /times/ 16 = 233.6 GeV/c) oxygen ions run in June of this year

  7. TPC workshop summary

    International Nuclear Information System (INIS)

    Nygren, D.R.

    1984-01-01

    The Time Projection Chamber (TPC) concept is now nearly ten years old and, as is evident in this workshop, is still evolving in many directions. From the liquid xenon TPC for double beta decay studies to the impressively large second generation TPC for the LEP experiment ALEPH, the surprising diversity of current applications is apparent. This workshop, the first to concentrate solely on the TPC has provided a most congenial and rewarding occasion for all TPC enthusiasts to share experience, results, and ideas

  8. AGS silicon gold collisions measured in the E-810 TPC [Time Projection Chamber

    International Nuclear Information System (INIS)

    Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Kruk, J.W.; Miettinen, H.E.; Mutchler, G.S.; Nessi, M.; Nessi-Tedaldi, F.; Roberts, J.B.; Chan, C.S.; Kramer, M.A.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Hallman, T.J.; Madansky, L.; Lindenbaum, S.J.

    1990-01-01

    The tracking detector of AGS Experiment 810 is a three-piece Time Projection Chamber (TPC) intended to measure all charged tracks in the forward hemisphere of the nucleon-nucleon center of mass system, i.e. forward of an angle of about 20 degrees in the lab. Each module of the TPC contains twelve rows of short anode wires which give 3-D space points on each track, but no dE/dx information useable for particle identification. The TPC was operated in a beam of silicon ions at the end of June 1989 and this talk reports the results of analysis of the data taken with a thin gold target in that run. We have gathered a similar amount of data from thin copper and silicon targets, the analysis of which is in a less advanced state. The results of our investigation of the neutral strange particle decays appear in a separate contribution by Al Saulys. This paper presents the current state of the analysis of the charged tracks from the silicon gold collisions. 1 ref., 15 figs

  9. The NA36 time projection chamber: An interim report on a TPC designed for a relativistic heavy ion experiment

    International Nuclear Information System (INIS)

    Diebold, G.E.

    1987-01-01

    Since its conception in the early 1970s, the Time Projection Chamber (TPC) has found application in several areas of particle physics ranging from e + e - collider experiments to rare decay studies of lepton nonconservation. A new and promising area of application for the TPC is the study of relativistic heavy ion collisions (RHIC). Presented here is an interim report on the first TPC for this field of physics, the NA36 TPC, being developed by Berkeley (LBL) for RHIC at the CERN SPS. Emphasis is placed on the operational and design considerations implemented to optimize the performance of the NA36 TPC in the study of central rapidity strange baryons produced in RHIC. The NA36 TPC volume is rectangular with an endcap area 0.5 m x 1.0 m and a maximum drift distance of 0.5 m. The drift volume is filled with Ar-CH 4 (9%) at one atmosphere. A total of 6400 channels of time digitizing electronics instrument 66% of the endcap in a wedge shaped area matched to fixed target kinematics. 6 refs., 5 figs

  10. A laser calibration system for the STAR TPC

    CERN Document Server

    Lebedev, A

    2002-01-01

    A Time Projection Chamber (TPC) is the primary tracking detector for the STAR experiment at RHIC. A laser calibration system was built to calibrate and monitor the TPC tracking performance. The laser system uses a novel design which produces approx 500 thin, ionizing beams distributed throughout the tracking volume. This new approach is significantly simpler than the traditional ones, and provides complete TPC coverage at a reduced cost. The laser system was used during the RHIC 2000 summer run to measure drift velocities with about 0.02% accuracy and to monitor the TPC performance. Calibration runs were made with and without a magnetic field to check B field map corrections.

  11. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  12. Charge Sensitive Amplifier (CSA) in cold gas of Liquid Argon (LAr) Time Projection Chamber (TPC)

    International Nuclear Information System (INIS)

    Bechetoille, E; Mathez, H; Zoccarato, Y

    2011-01-01

    This paper presents our work on a 8-channel low noise Front-End electronic coupled to a Liquid Argon (LAr) TPC (Time Projection Chamber). Each channel consists of a Charge Sensitive Amplifier (CSA), a band pass filter and a 50 Ohms buffer as line driver. A serial link based on a 'i2c-like' protocol, provides multiple configuration features to the circuit by accessing slow control registers. In this paper, we describe the CSA, the shaper and the slow control part. The feedback network of the CSA is made of a capacitance and a resistor. Their values are respectively 250 fF and 4 MΩ. An input referred noise of, at most, 1500 e- rms must be achieved at -100 deg. C with an input detector capacitance of 250 pF to ensure a correct measurement of the minimal signal of 18000e- (2.88 fC). The power consumption in this cryogenic setup must be less than 40 mW from a 3.3 V power supply.

  13. TPC magnet cryogenic system

    International Nuclear Information System (INIS)

    Green, M.A.; Burns, W.A.; Taylor, J.D.; Van Slyke, H.W.

    1980-03-01

    The Time Projection Chamber (TPC) magnet at LBL and its compensation solenoids are adiabatically stable superconducting solenoid magnets. The cryogenic system developed for the TPC magnet is discussed. This system uses forced two-phase tubular cooling with the two cryogens in the system. The liquid helium and liquid nitrogen are delivered through the cooled load by forced tubular flow. The only reservoirs of liquid cryogen exist in the control dewar (for liquid helium) and the conditioner dewar (for liquid nitrogen). The operation o these systems during virtually all phases of system operation are described. Photographs and diagrams of various system components are shown, and cryogenic system data are presented in the following sections: (1) heat leaks into the TPC coil package and the compensation solenoids; (2) heat leaks to various components of the TPC magnet cryogenics system besides the magnets and control dewar; (3) the control dewar and its relationship to the rest of the system; (4) the conditioner system and its role in cooling down the TPC magnet; (5) gas-cooled electrical leads and charging losses; and (6) a summation of the liquid helium and liquid nitrogen requirements for the TPC superconducting magnet system

  14. The GAP-TPC

    International Nuclear Information System (INIS)

    Rossi, B.; Anastasio, A.; Boiano, A.; Cocco, A.G.; Meo, P. Di; Vanzanella, A.; Catalanotti, S.; Covone, G.; Longo, G.; Walker, S.; Fiorillo, G.; Wang, H.; Wang, Y.

    2016-01-01

    Several experiments have been conducted worldwide, with the goal of observing low-energy nuclear recoils induced by WIMPs scattering off target nuclei in ultra-sensitive, low-background detectors. In the last few decades noble liquid detectors designed to search for dark matter in the form of WIMPs have been extremely successful in improving their sensitivities and setting the best limits. One of the crucial problems to be faced for the development of large size (multi ton-scale) liquid argon experiments is the lack of reliable and low background cryogenic PMTs: their intrinsic radioactivity, cost, and borderline performance at 87 K rule them out as a possible candidate for photosensors. We propose a brand new concept of liquid argon-based detector for direct dark matter search: the Geiger-mode Avalanche Photodiode Time Projection Chamber (GAP-TPC) optimized in terms of residual radioactivity of the photosensors, energy and spatial resolution, light and charge collection efficiency

  15. ALICE installs its TPC

    CERN Multimedia

    2007-01-01

    The ALICE time projection chamber has been transported to the experimental cavern. The handling of this extremely fragile detector was a long and delicate process. The lorry transporting the TPC took one hour to travel from the assembly hall to the access shaft...200 metres away.The TPC was lowered into the ALICE experimental cavern with extreme care. The gap between the structure and the shaft wall was only 10 centimetres! For ALICE the year started with a flurry of activity...but at a snail's pace. On 8 January, the day CERN reopened after the end-of-year break, teams from ALICE and the TS Department began the transportation of the experiment's time projection chamber (TPC), the largest ever built. This 5-metre long and 5-m diameter cylinder was transported from the clean room where it had been assembled to the experimental cavern. The 300-metre journey took no less than four days! Since the TPC is an extremely fragile object, the utmost precautions were exercised in its transportation. The TPC, which is d...

  16. Compression of TPC data in the ALICE experiment

    International Nuclear Information System (INIS)

    Nicolaucig, A.; Mattavelli, M.; Carrato, S.

    2002-01-01

    In this paper two algorithms for the compression of the data generated by the Time Projection Chamber (TPC) detector of the ALICE experiment at CERN are described. The first algorithm is based on a lossless source code modeling technique, i.e. the original TPC signal information can be reconstructed without errors at the decompression stage. The source model exploits the temporal correlation that is present in the TPC data to reduce the entropy of the source. The second algorithm is based on a source model which is lossy if samples of the TPC signal are considered one by one. Conversely, the source model is lossless or quasi-lossless if some physical quantities that are of main interest for the experiment are considered. These quantities are the area and the location of the center of mass of each TPC signal pulse. Obviously entropy coding is applied to the set of events defined by the two source models to reduce the bit rate to the corresponding source entropy. Using TPC simulated data according to the expected ALICE TPC performance, the lossless and the lossy compression algorithms achieve a data reduction, respectively, to 49.2% and in the range of 34.2% down to 23.7% of the original data rate. The number of operations per input symbol required to implement the compression stage for both algorithms is relatively low, so that a real-time implementation embedded in the TPC data acquisition chain using low-cost integrated electronics is a realistic option to effectively reduce the data storing cost of ALICE experiment

  17. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  18. Highly integrated electronics for the star TPC

    Energy Technology Data Exchange (ETDEWEB)

    Arthur, A.A.; Bieser, F.; Hearn, W.; Kleinfelder, S.; Merrick, T.; Millaud, J.; Noggle, T.; Rai, G.; Ritter, H.G.; Wieman, H. [Lawrence Berkeley Laboratory, CA (United States)

    1991-12-31

    The concept for the STAR TPC front-end electronics is presented and the progress toward the development of a fully integrated solution is described. It is the goal of the R+D program to develop the complete electronics chain for the STAR central TPC detector at RHIC. It is obvious that solutions chosen e.g. for ALEPH are not adequate for the 150000 channels that need to be instrumented for readout. It will be necessary to perform all the signal processing, digitization and multiplexing directly on the detector in order to reduce per channel cost and the amount of cabling necessary to read out the information. We follow the approach chosen by the EOS TPC project, where the readout electronics on the detector consists of an integrated preamplifier, a hybrid shaping amplifier, an integrated switched capacitor array and a highly multiplexed ADC. The STAR electronics will be further integrated so that approximately 16 channels of the preamplifier, the shaper, the analog store and the ADC will be contained in two integrated circuits located directly on the pad plane.

  19. Photostructured coating on a voltage degrader for a Time Projection Chamber (TPC)

    CERN Document Server

    Manaranche, C; Loquet, J L; Serdiouk, V; Scandurra, M; Zucchelli, P

    2002-01-01

    Fibreglass-reinforced epoxy (Stesalit) tubes and rods were coated with a photostructured metal layer system of copper, nickel and gold for a voltage degrader built in a particle detector at CERN, Geneva. The metal layers were applied with galvanotechnical processes involving an original photolithographic exposure in three dimensions to produce a complex electrical circuit design able to provide the correct potential to 420 different conductors. The Stesalit substrate material, even after a first layer of electroless copper, is electrically quite resistive, creating problems for the electrodeposition of the subsequent nickel layer. A mathematical simulation of the plating thickness distribution showed that the electrolytic nickel deposition was suitable for short rods but electroless nickel was needed for the long rods. The functional properties of the metallized Stesalit components are satisfactory: no degradation of the gas quality within the Time Projection Chamber is observed; the potential distribution al...

  20. CCD's at TPC

    International Nuclear Information System (INIS)

    Zeller, M.E.

    1977-01-01

    The CCD, Charge Coupled Device, is an analog shift register for which application to the readout of particle detectors has recently been realized. These devices can be used to detect optical information directly, providing an automated readout for streamer or other optical chambers, or as a single input shift register, acting in this instance as a delay line for analog information. A description is given of the latter mode of operation and its utility as a readout method for drift chambers. Most of the information contained herein has been obtained from tests performed in connection with PEP TPC project, PEP-4. That detector will employ approximately 10 4 CCD's making it a reasonable testing ground for ISABELLE size detectors

  1. TPC track distortions III: fiat lux

    CERN Document Server

    Boyko, I; Dydak, F; Elagin, A; Gostkin, M; Guskov, A; Koreshev, V; Nefedov, Y; Nikolaev, K; Veenhof, R; Wotschack, J; Zhemchugov, A

    2005-01-01

    We present a comprehensive overview and final summary of all four types of static track distortions seen in the HARP TPC, in terms of physical origins, mathematical modelling, and correction algorithms. 'Static'™ distortions are defined as not depending on the event time within the 400 ms long accelerator spill. Calculated static distortions are compared with measurements from cosmic-muon tracks. We characterize track distortions by the r phi residuals of cluster positions with respect to the transverse projection of a helical trajectory constrained by hits in the RPC overlap regions. This method provides a fixed TPC-external reference system (by contrast to the co-moving coordinate system associated with a fit) which solely permits to identify individually, and measure quantitatively, the static TPC track distortions arising from (i) the inhomogeneity of the solenoidal magnetic field, (ii) the inhomogeneity of the electric field from the high-voltage mismatch between the inner and outer TPC field cages, (...

  2. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  3. Performance and applications of a μ-TPC

    International Nuclear Information System (INIS)

    Miuchi, Kentaro; Kubo, Hidetoshi; Nagayoshi, Tsutomu; Okada, Yoko; Orito, Reiko; Takada, Atsushi; Takeda, Atsushi; Tanimori, Toru; Ueno, Masaru; Bouianov, Oleg; Bouianov, Marina

    2004-01-01

    A μ-TPC, a time projection chamber (TPC) which can detect three-dimensional fine tracks of charged particles, was developed and its performance was measured. We developed a μ-TPC with a detection volume of 10x10x10cm3 based on a novel two-dimensional imaging gaseous detector, or the μ-PIC. Fine tracks of charged particles with large energy depositions (protons and electrons) were detected with the μ-TPC. With a pressurized gas, tracks of the minimum ionizing particles were detected. We showed the principle of the application for the time-resolved neutron imaging detector

  4. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  5. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  6. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  7. Lossy compression of TPC data and trajectory tracking efficiency for the ALICE experiment

    International Nuclear Information System (INIS)

    Nicolaucig, A.; Ivanov, M.; Mattavelli, M.

    2003-01-01

    In this paper a quasi-lossless algorithm for the on-line compression of the data generated by the Time Projection Chamber (TPC) detector of the ALICE experiment at CERN is described. The algorithm is based on a lossy source code modeling technique, i.e. it is based on a source model which is lossy if samples of the TPC signal are considered one by one; conversely, the source model is lossless or quasi-lossless if some physical quantities that are of main interest for the experiment are considered. These quantities are the area and the location of the center of mass of each TPC signal pulse, representing the pulse charge and the time localization of the pulse. So as to evaluate the consequences of the error introduced by the lossy compression process, the results of the trajectory tracking algorithms that process data off-line after the experiment are analyzed, in particular, versus their sensibility to the noise introduced by the compression. Two different versions of these off-line algorithms are described, performing cluster finding and particle tracking. The results on how these algorithms are affected by the lossy compression are reported. Entropy coding can be applied to the set of events defined by the source model to reduce the bit rate to the corresponding source entropy. Using TPC simulated data according to the expected ALICE TPC performance, the compression algorithm achieves a data reduction in the range of 34.2% down to 23.7% of the original data rate depending on the desired precision on the pulse center of mass. The number of operations per input symbol required to implement the algorithm is relatively low, so that a real-time implementation of the compression process embedded in the TPC data acquisition chain using low-cost integrated electronics is a realistic option to effectively reduce the data storing cost of ALICE experiment

  8. The ALICE TPC

    CERN Document Server

    Garabatos, C

    2004-01-01

    We describe the ALICE TPC, with emphasis on the design features which are driven by the physics requirements of the detector. In particular, the gas choice and composition, Ne-CO/sub 2/ Ý90-10¿, as well as the unprecedentedly high gain for a TPC (2*10/sup 40/), are direct consequences of the expected performance in the high- multiplicity environment of heavy-ion collisions at the LHC. The characteristics of this mixture are discussed and a viable way of improving the stability of detectors working under these conditions, namely the addition of nitrogen into the mixture, is presented. This results in a more effective Penning transfer of neon excited states onto ionisation of the quencher at no penalty for the charge transport and amplification properties.

  9. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  10. CAMAC interface for TPC data-acquisition electronics

    International Nuclear Information System (INIS)

    Sidman, S.; Olson, S.; Jared, R.

    1983-06-01

    The Time Projection Chamber (TPC) is a detector used for high-energy physics research at the Stanford PEP Accelerator. TPC requires about 17,000 channels of data acquisition, which samples on command the input to each channel at a 10 MHz rate. This high data rate is made possible by means of Charge Coupled Devices (CCDs), intelligent digitizers, and a sophisticated trigger system. The TPC-CAMAC interface described here was developed to allow experiments of smaller scale than the complete TPC to use the standard data acquisition portion of the TPC electronics, namely the amplifier, CCD and digitizer bins. These three bins, when properly interconnected and controlled by the interface control bin, form a transient digitizer with a depth of 455 samples and a maximum width of 256 channels per bin set

  11. 14 CFR 151.41 - Project costs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...

  12. Calibration of the DELPHI Time Projection chamber (TPC) and measurement of the Z0 parameters through its hadronic decays

    International Nuclear Information System (INIS)

    Gros, M.H.

    1990-05-01

    The work presented in this thesis has been performed on the DELPHI experiment, at the CERN large electron-positron collider: LEP. At first, a review of the apparatus, the data taking and the trigger used in 1989 is done, and their performances are shown. Then a detailed presentation of the main charged detector, the Time Projection Chamber is done. Its reliability lies on a precise monitoring of the electric field and on a very good knowledge of the electron drift velocity in the gas (80% argon-20% methan). These two goals are achieved using ultraviolet nitrogen lasers which simulate the crossing of particles through the detector. The complete sequence of operations is described, from the data taking up to the computation of the drift velocity (66.67 mm per microsecond). The second part of this work deals with the determination of the Z 0 resonance parameters. At first are described the theoretical expectations of the Standard Model and the radiative corrections which have to be taken into account in the hadronic Z 0 decays. Then the methods used for the computation of the luminosity and the selection of the hadronic Z 0 decays are presented. By combining these two informations the experimental hadronic cross section is derived. A fit of the theoretical line shape allows us to determine the mass, the width and the Born cross section of the Z 0 resonance. Using constants given by the Standard Model one can exclude at fourth neutrino lighter than 37 GeV/c 2 at the 95% confidence level [fr

  13. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  14. First results from the CERES radial TPC

    International Nuclear Information System (INIS)

    Marin, A.; Agakichiev, G.; Appelshaeuser, H.; Baur, R.; Belaga, V.; Bell, R.; Braun-Munzinger, P.; Ceretto, F.; Cherlin, A.; Damjanovic, S.; Dietel, T.; Drees, A.; Ernst, P.; Esumi, S.I.; Filimonov, K.; Fraenkel, Z.; Gnaenski, A.; Garabatos, C.; Glaessel, P.; Hanzal, V.; Hausmann, M.; Hering, G.; Hrivnacova, I.; Holl, P.; Kushpil, V.; Lenkeit, B.; Messer, M.; Milov, A.; Miskowiec, D.; Panebrattsev, Y.; Petracek, V.; Pfeiffer, A.; Rak, J.; Ravinovich, I.; Razin, S.; Rehak, P.; Richter, M.; Saveljic, N.; Schaefer, E.; Schmitz, W.; Schukraft, J.; Seipp, W.; Sharma, A.; Shimansky, S.; Slivova, J.; Socol, E.; Specht, H.J.; Stachel, J.; Stiller, P.; Sumbera, M.; Tilsner, H.; Tserruya, I.; Voigt, C.; Voloshin, S.; Wessels, J.P.; Wienold, T.; Windelband, B.; Wurm, J.P.; Xie, W.; Yurevich, V.

    1999-01-01

    The CERES/NA45 experiment at the CERN SPS was upgraded in 1998 by the addition of a cylindrical Time Projection Chamber. The aim is to improve the mass resolution of e + e - pairs in the ρ/ω/phi region to Δm/m < 2%. A progress report is given on the TPC performance during the 1998 commissioning runs (laser rays, beam halo muons, and particles produced by proton/π and lead beams hitting Pb and Au targets)

  15. Some TPC measurements in an oxygen beam at the AGS

    International Nuclear Information System (INIS)

    Love, W.A.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Krishna, N.; Kruk, J.W.; Miettinen, H.E.; Mutchler, G.S.; Nessi-Tedaldi, F.; Nessi, M.; Phillips, G.C.; Roberts, J.B.; Chan, C.S.; Kramer, M.A.; Hallman, T.J.; Madansky, L.; Lindenbaum, S.J.

    1989-01-01

    The principal detector for AGS Experiment 810 is a Time Projection Chamber (TPC) in which it is intended to measure momenta and angles of a major fraction of the charged particles from each light ion collision. This report describes the results of a test of a prototype of the TPC in a beam of (14.6x16=233.6 GeV/c) oxygen ions run in June of this year. (orig.)

  16. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  17. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  18. Strange particle measurements from the EOS TPC

    International Nuclear Information System (INIS)

    Justice, M.

    1995-02-01

    A high statistics sample of Λ's produced in 2 GeV/nucleon 5 8Ni + nat Cu collisions has been obtained with the EOS Time Projection Chamber at the Bevalac. The coverage of the EOS TPC is essentially 100% for y > y cm and extends down to P T = 0 where interesting effects such as collective radial expansion may be important. In addition, the detection of a majority of the charged particles in the TPC, along with the presence of directed flow for protons and heavier fragments at this beam energy, allows for the correlation of A production with respect to the event reaction plane. Our preliminary analysis indicates the first observation of a sidewards flow signature for A's. Comparisons with the cascade code ARC are made

  19. Results from the STAR TPC system test

    International Nuclear Information System (INIS)

    Betts, W.

    1996-01-01

    A system test of various components of the Solenoidal Tracker at RHIC (STAR) detector, operating in concern, has recently come on-line. Communication between a major sub-detector, a sector of the Time Projection Chamber (TPC), and the trigger, data acquisition and slow controls systems has been established, enabling data from cosmic ray muons to be collected. First results from an analysis of the TPC data are presented. These include measurements of system noise, electronic parameters such as amplifier gains and pedestal values, and tracking resolution for cosmic ray muons and laser induced ionization tracks. A discussion on the experience gained in integrating the different components for the system test is also given

  20. A large ungated TPC with GEM amplification

    Science.gov (United States)

    Berger, M.; Ball, M.; Fabbietti, L.; Ketzer, B.; Arora, R.; Beck, R.; Böhmer, F. V.; Chen, J.-C.; Cusanno, F.; Dørheim, S.; García, F.; Hehner, J.; Herrmann, N.; Höppner, C.; Kaiser, D.; Kis̆, M.; Kleipa, V.; Konorov, I.; Kunkel, J.; Kurz, N.; Leifels, Y.; Müllner, P.; Münzer, R.; Neubert, S.; Rauch, J.; Schmidt, C. J.; Schmitz, R.; Soyk, D.; Vandenbroucke, M.; Voss, B.; Walther, D.; Zmeskal, J.

    2017-10-01

    A Time Projection Chamber (TPC) is an ideal device for the detection of charged particle tracks in a large volume covering a solid angle of almost 4 π. The high density of hits on a given particle track facilitates the task of pattern recognition in a high-occupancy environment and in addition provides particle identification by measuring the specific energy loss for each track. For these reasons, TPCs with Multiwire Proportional Chamber (MWPC) amplification have been and are widely used in experiments recording heavy-ion collisions. A significant drawback, however, is the large dead time of the order of 1 ms per event generated by the use of a gating grid, which is mandatory to prevent ions created in the amplification region from drifting back into the drift volume, where they would severely distort the drift path of subsequent tracks. For experiments with higher event rates this concept of a conventional TPC operating with a triggered gating grid can therefore not be applied without a significant loss of data. A continuous readout of the signals is the more appropriate way of operation. This, however, constitutes a change of paradigm with considerable challenges to be met concerning the amplification region, the design and bandwidth of the readout electronics, and the data handling. A mandatory prerequisite for such an operation is a sufficiently good suppression of the ion backflow from the avalanche region, which otherwise limits the tracking and particle identification capabilities of such a detector. Gas Electron Multipliers (GEM) are a promising candidate to combine excellent spatial resolution with an intrinsic suppression of ions. In this paper we describe the design, construction and the commissioning of a large TPC with GEM amplification and without gating grid (GEM-TPC). The design requirements have driven innovations in the construction of a light-weight field-cage, a supporting media flange, the GEM amplification and the readout system, which are

  1. Modular TPC's for relativistic heavy ion experiments

    International Nuclear Information System (INIS)

    Etkin, A.; Eiseman, S.E.; Foley, K.J.

    1989-01-01

    We have developed a TPC system for use in relativistic heavy ion experiments that permits the efficient reconstruction of high multiplicity events including events with decay vertices. It operates with the beam through the middle of the chamber giving good efficiency, two-track separation and spatial resolution. The three-dimensional points in this system allow the reconstruction of the complex events of interest. The use of specially developed hybrid electronics allows us to build a compact and cost-effective system. 11 figs

  2. First results from the CERES radial TPC

    CERN Document Server

    AUTHOR|(CDS)2108583; Appelshäuser, H; Baur, R; Belaga, V; Bell, R; Braun-Munzinger, P; Ceretto, F; Cherlin, A; Damjanovic, S; Dietel, T; Drees, A; Ernst, P; Esumi, S I; Filimonov, K; Fraenkel, Zeev; Gnaenski, A; Garabatos, C; Glässel, P; Hanzal, V; Hausmann, M; Hering, G; Hrivnacova, I; Holl, P; Kushpil, V; Lenkeit, B C; Messer, M; Milov, A; Miskowiec, D; Panebratsev, Yu A; Petracek, V; Pfeiffer, A; Rak, J; Ravinovich, I; Razin, S; Rehak, P; Richter, M; Saveljic, N; Schäfer, E; Schmitz, W; Schükraft, Jürgen; Seipp, W; Sharma, A; Shimansky, S S; Slivova, J; Socol, E; Specht, H J; Stachel, J; Stiller, P; Sumbera, M; Tilsner, H; Tserruya, Itzhak; Voigt, C A; Voloshin, S A; Wessels, J P; Wienold, T; Windelband, B; Wurm, J P; Xie, W; Yurevich, V

    1999-01-01

    The CERES/NA45 experiment at the CERN SPS was upgraded in 1998 by the addition of a cylindrical Time Projection Chamber. The aim is to improve the mass resolution of e sup + e sup - pairs in the rho/omega/phi region to DELTA m/m < 2%. A progress report is given on the TPC performance during the 1998 commissioning runs (laser rays, beam halo muons, and particles produced by proton/pi and lead beams hitting Pb and Au targets).

  3. First results from the CERES radial TPC

    Energy Technology Data Exchange (ETDEWEB)

    Marin, A.; Agakichiev, G.; Appelshaeuser, H.; Baur, R.; Belaga, V.; Bell, R.; Braun-Munzinger, P.; Ceretto, F.; Cherlin, A.; Damjanovic, S.; Dietel, T.; Drees, A.; Ernst, P.; Esumi, S.I.; Filimonov, K.; Fraenkel, Z.; Gnaenski, A.; Garabatos, C.; Glaessel, P.; Hanzal, V.; Hausmann, M.; Hering, G.; Hrivnacova, I.; Holl, P.; Kushpil, V.; Lenkeit, B.; Messer, M.; Milov, A.; Miskowiec, D.; Panebrattsev, Y.; Petracek, V.; Pfeiffer, A.; Rak, J.; Ravinovich, I.; Razin, S.; Rehak, P.; Richter, M.; Saveljic, N.; Schaefer, E.; Schmitz, W.; Schukraft, J.; Seipp, W.; Sharma, A.; Shimansky, S.; Slivova, J.; Socol, E.; Specht, H.J.; Stachel, J.; Stiller, P.; Sumbera, M.; Tilsner, H.; Tserruya, I.; Voigt, C.; Voloshin, S.; Wessels, J.P.; Wienold, T.; Windelband, B.; Wurm, J.P.; Xie, W.; Yurevich, V

    1999-12-27

    The CERES/NA45 experiment at the CERN SPS was upgraded in 1998 by the addition of a cylindrical Time Projection Chamber. The aim is to improve the mass resolution of e{sup +}e{sup -} pairs in the {rho}/{omega}/phi region to {delta}m/m < 2%. A progress report is given on the TPC performance during the 1998 commissioning runs (laser rays, beam halo muons, and particles produced by proton/{pi} and lead beams hitting Pb and Au targets)

  4. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  5. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  6. TPC spectrometer for measuring the e+ spectrum in μ decay

    International Nuclear Information System (INIS)

    Kinnison, W.W.

    1983-01-01

    The Time Projection Chamber (TPC) being used at the Los Alamos Meson Physics Facility (LAMPF) for a high-statistics normal muon-decay experiment is described. It is shown how the experiment will improve upon the limits of the weak-interaction coupling constants by a factor of 5 through the measurement of the positron momentum and direction of emission with respect to the muon-polarization vector for 10 8 decays of stopped, polarized, positive muons. The TPC apparatus is described, and it is shown that even though more work is to be done to improve the detector acceptance and individual coordinate resolutions, for certain track topologies, the TPC already has a momentum resolution of 0.7% (sigma)

  7. Electronic Devices for Controlling the Very High Voltage in the ALICE TPC Detector

    CERN Document Server

    Boccioli, Marco

    2007-01-01

    The Time Projection Chamber (TPC) is the core of the ALICE experiment at CERN. The TPC Very High Voltage project covers the development of the control system for the power supply that generates the 100kV necessary for the drift field in the TPC. This paper reports on the project progress, introducing the control system architecture from the electronics up to the control level. All the electronic devices will be described, highlighting their communication issues, and the challenges in integrating these devices in a PLC-based control system.

  8. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  9. Inbetriebnahme und Kalibrierung der ALICE-TPC

    CERN Document Server

    Wiechula, Jens

    2008-01-01

    ALICE (A Large Ion Collider Experiment), is the dedicated heavy-ion experiment at the Large Hadron Collider (LHC) at CERN. It is optimised to reconstruct and identify the particles created in a lead-lead collision with a centre of mass energy of 5.5TeV. The main tracking detector is a large-volume time-projection chamber (TPC). With an active volume of about 88m^3 and a total readout area of 32.5m^2 it is the most challenging TPC ever build. A central electrode divides the 5m long detector into two drift regions. Each readout side is subdivided into 18 inner and 18 outer multi-wire proportional read-out chambers. The readout area is subdivide into 557568 pads, where each pad is read out by and electronics chanin. A complex calibration is needed in order to reach the design position-resolution of the reconstructed particle tracks of about 200um. One part of the calibration lies in understanding the electronic-response. The work at hand presents results of the pedestal and noise behaviour of the front-end elect...

  10. The ALICE TPC front end electronics

    CERN Document Server

    Musa, L; Bialas, N; Bramm, R; Campagnolo, R; Engster, Claude; Formenti, F; Bonnes, U; Esteve-Bosch, R; Frankenfeld, Ulrich; Glässel, P; Gonzales, C; Gustafsson, Hans Åke; Jiménez, A; Junique, A; Lien, J; Lindenstruth, V; Mota, B; Braun-Munzinger, P; Oeschler, H; Österman, L; Renfordt, R E; Ruschmann, G; Röhrich, D; Schmidt, H R; Stachel, J; Soltveit, A K; Ullaland, K

    2004-01-01

    In this paper we present the front end electronics for the time projection chamber (TPC) of the ALICE experiment. The system, which consists of about 570000 channels, is based on two basic units: (a) an analogue ASIC (PASA) that incorporates the shaping-amplifier circuits for 16 channels; (b) a mixed-signal ASIC (ALTRO) that integrates 16 channels, each consisting of a 10-bit 25-MSPS ADC, the baseline subtraction, tail cancellation filter, zero suppression and multi-event buffer. The complete readout chain is contained in front end cards (FEC), with 128 channels each, connected to the detector by means of capton cables. A number of FECs (up to 25) are controlled by a readout control unit (RCU), which interfaces the FECs to the data acquisition (DAQ), the trigger, and the detector control system (DCS) . A function of the final electronics (1024 channels) has been characterized in a test that incorporates a prototype of the ALICE TPC as well as many other components of the final set-up. The tests show that the ...

  11. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  12. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  13. Resolution studies of a GEM-based TPC

    International Nuclear Information System (INIS)

    Killenberg, M.

    2006-01-01

    Currently there are four different concept studies trying to optimise the detector for the requirements at the ILC. In three of these detector concepts a time projection chamber (TPC) is foreseen as the main tracking device. To achieve the intended spatial resolution of 100 μm, micro pattern gas detectors (MPGD) are considered for gas amplification. The two different MPGDs discussed for the ILC TPC are Micro-Mesh Gaseous Detectors (Micromegas) and Gas Electron Multiplier foils (GEMs). The current thesis shows resolution studies with a TPC prototype equipped with a triple GEM readout structure. A hodoscope made up of silicon strip sensors gives a precision reference track, allowing an unbiased measurement of the spatial resolution. High statistics measurements have been conducted at the DESY test beam facility, which provides positrons with a tunable energy between 1 GeV and 6 GeV. Using the independent measurement of the hodoscope allows systematic studies of the homogeneity of the TPC's electric field. The fluctuations of the field in the chamber's central region were found to be ΔE/E=8.10 -3 . Field distortions have been determined and corrected, reducing the remaining deviations to a level well below the spatial resolution of the TPC. One important task is to reduce the number of ions drifting back into the sensitive volume. Special GEM settings with minimised ion backdrift have been examined with respect to their influence on the spatial resolution and it was found that the spatial resolution is not degraded using these special settings. The TPC prototype has been operated in a 4 T magnetic field, provided by a superconducting solenoid located at DESY Hamburg. Again the spatial resolution measured with the ion backdrift optimised settings is compared to that achieved with nonoptimised settings. In both cases the measured resolution is approximately 130 μm. (orig.)

  14. Resolution studies of a GEM-based TPC

    Energy Technology Data Exchange (ETDEWEB)

    Killenberg, M.

    2006-12-15

    Currently there are four different concept studies trying to optimise the detector for the requirements at the ILC. In three of these detector concepts a time projection chamber (TPC) is foreseen as the main tracking device. To achieve the intended spatial resolution of 100 {mu}m, micro pattern gas detectors (MPGD) are considered for gas amplification. The two different MPGDs discussed for the ILC TPC are Micro-Mesh Gaseous Detectors (Micromegas) and Gas Electron Multiplier foils (GEMs). The current thesis shows resolution studies with a TPC prototype equipped with a triple GEM readout structure. A hodoscope made up of silicon strip sensors gives a precision reference track, allowing an unbiased measurement of the spatial resolution. High statistics measurements have been conducted at the DESY test beam facility, which provides positrons with a tunable energy between 1 GeV and 6 GeV. Using the independent measurement of the hodoscope allows systematic studies of the homogeneity of the TPC's electric field. The fluctuations of the field in the chamber's central region were found to be {delta}E/E=8.10{sup -3}. Field distortions have been determined and corrected, reducing the remaining deviations to a level well below the spatial resolution of the TPC. One important task is to reduce the number of ions drifting back into the sensitive volume. Special GEM settings with minimised ion backdrift have been examined with respect to their influence on the spatial resolution and it was found that the spatial resolution is not degraded using these special settings. The TPC prototype has been operated in a 4 T magnetic field, provided by a superconducting solenoid located at DESY Hamburg. Again the spatial resolution measured with the ion backdrift optimised settings is compared to that achieved with nonoptimised settings. In both cases the measured resolution is approximately 130 {mu}m. (orig.)

  15. Research on the Investment Costs of IT Project

    Science.gov (United States)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  16. Magnetic field map for a large TPC prototype

    International Nuclear Information System (INIS)

    Grefe, Christian

    2008-12-01

    A new e + e - linear collider with an energy of up to 1000 GeV is currently being planned: the International Linear Collider (ILC). It will allow high precision measurements of the Higgs boson and physics beyond the Standard Model. In the Large Detector Concept (LDC) -which is one of the proposed detector concepts for the ILC- a Time Projection Chamber (TPC) is intended as the main tracking device. Within the EUDET project a large TPC prototype is currently being built as an infrastructure to test different gas amplification and readout technologies. The prototype will be operated in a 1T superconducting solenoid magnet -the PCMAG- at the DESY testbeam area. In order to reach the best possible track reconstruction the magnetic field has to be known very precisely throughout the TPC volume. The magnetic field of PCMAG has been measured in July 2007. In this work the creation of a high precision field map from the measurements is presented. The magnet and modelling techniques for its magnetic field are described. A model of the magnet has been created as a best fit from the measurements and its limitations are investigated. The field map will be included in the reconstruction software for the TPC prototype. (orig.)

  17. Magnetic field map for a large TPC prototype

    Energy Technology Data Exchange (ETDEWEB)

    Grefe, Christian

    2008-12-15

    A new e{sup +}e{sup -} linear collider with an energy of up to 1000 GeV is currently being planned: the International Linear Collider (ILC). It will allow high precision measurements of the Higgs boson and physics beyond the Standard Model. In the Large Detector Concept (LDC) -which is one of the proposed detector concepts for the ILC- a Time Projection Chamber (TPC) is intended as the main tracking device. Within the EUDET project a large TPC prototype is currently being built as an infrastructure to test different gas amplification and readout technologies. The prototype will be operated in a 1T superconducting solenoid magnet -the PCMAG- at the DESY testbeam area. In order to reach the best possible track reconstruction the magnetic field has to be known very precisely throughout the TPC volume. The magnetic field of PCMAG has been measured in July 2007. In this work the creation of a high precision field map from the measurements is presented. The magnet and modelling techniques for its magnetic field are described. A model of the magnet has been created as a best fit from the measurements and its limitations are investigated. The field map will be included in the reconstruction software for the TPC prototype. (orig.)

  18. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  19. Project feasibility and mine production costs

    Energy Technology Data Exchange (ETDEWEB)

    Longworth, C R

    1987-01-01

    The paper outlines the present investment environment existing in the Australian Coal Industry and places this in the context of the current world seaborne coal trade. Those factors which have the greatest influence on the viability of coal projects today, namely coal prices and quality, exchange rates, cash cost of production, capital and borrowing costs, infrastructure and government charges are dealt with briefly. The paper concludes by giving a schedule of those factors of a local character which can be changed to render projects more competitive and also presents some external factors beyond Australia's control which will, in part, influence the development of the industry in the next decade. 4 refs., 8 figs.

  20. The Pixel-TPC. Demonstration of the concept and results

    Energy Technology Data Exchange (ETDEWEB)

    Lupberger, Michael [Universitaet Bonn (Germany); Collaboration: LCTPC-Deutschland-Collaboration

    2016-07-01

    A Time Projection Chamber (TPC) is foreseen as tracker for the ILD, one of the two detector concepts at the planned International Linear Collider (ILC). At the TPC endplates, Micromegas or GEMs will be used as gas amplification structure. Besides segmented anodes, also an active endplate with pixel chips, in our experiments the Timepix ASIC, is considered as a readout option. In a photolithographic process a grid has been produced on top of the chip to form a so called InGrid, which is a Micromegas-like gas amplification structure. Several thousand InGrids are necessary to equip a complete TPC endplate. For demonstration of the concept, three endplate modules have been built with a total of 160 InGrids covering an active area of about 300 cm{sup 2}. To read out the 10.5 million channels, the Timepix ASIC was implemented in a general readout system. A dedicated powering scheme, DAQ and online event display were developed by our group. The feasibility of the Pixel-TPC could be proven in a test beam campaign at DESY early 2015. The data has partly been analysed and shows the potential of this new type of detector. An overview of the developments necessary to build the detector is presented followed by impressions from the test beam and some of the results from the data analysis.

  1. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  2. Track reconstruction of normal muon decays in the LAMPF TPC: one working scheme

    International Nuclear Information System (INIS)

    McKee, R.J.

    1983-01-01

    A working scheme for track reconstruction of normal muon decays in the LAMPF TPC is here outlined. Muon tracks stopping in the TPC and helical electron tracks from muon decay are both identified and fitted for complete event reconstruction. Because of certain geometrical characteristics of the TPC, novel techniques are deployed to find the tracks. Normal road tracing methods do not work reliably; they are replaced by, among other things, a random search technique that locates the helix's planar projection and a carefully worked-out method for correctly putting each coordinate on its proper turn in the helix

  3. Sharing the cost of risky projects

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moulin, Hervé

    2018-01-01

    Users share the cost of unreliable non-rival projects (items). For instance, industry partners pay today for R&D that may or may not deliver a cure to some viruses, agents pay for the edges of a network that will cover their connectivity needs, but the edges may fail, etc. Each user has a binary...

  4. Status of PEP and TPC/2γ

    International Nuclear Information System (INIS)

    Zapalac, G.

    1989-06-01

    The TPC/2γ program at PEP has been upgraded by increasing the PEP luminosity and by the adding of a vertex chamber to the TPC detector. These improvements will allow a strong program in B and τ physics, and will contribute to ongoing studies in two-photon physics and hadronization. 10 refs., 3 figs

  5. Development of a high rate TPC. The ALICE TPC upgrade after LS2

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Markus [Rheinische Friedrich-Wilhelms-Universitaet Bonn (Germany); Collaboration: ALICE-Collaboration

    2016-07-01

    The ALICE (A Large Ion Collider Experiment at CERN) collaboration plans an upgrade of the detector system during the second long shutdown of the LHC, during which the interaction rate will be increased to 50 kHz for Pb-Pb collisions. This demands operation of the Time Projection Chamber (TPC) in an ungated continuous mode. A conventional gating grid can not be used to prevent ions drifting back into the drift volume. Micro Pattern Gaseous Detectors (MPGD) such as GEMs and Micromegas offer suppression of the ion backflow. To keep distortions due to space-charge at a tolerable level an ion yield of 10 to 20 back drifting ions per incoming electron is required. However, the need for low ion backflow might be in conflict to other key parameters such as the detector performance and stability of the system. Therefore a careful optimisation of all three requirements was needed. Furthermore the large scale capability of the system has to be guaranteed. Test beams have been carried out to study the large scale performance with an Inner Readout Chamber (IROC) equipped with a multiple GEM system. Also an quadruple GEM Outer Readout Chamber (OROC) was assembled and successfully operated being the largest detector of this type. The upgrade of all readout chambers with a quadruple GEM system has started in 2016. The strategy and the work flow of the TPC upgrade are presented.

  6. Behavior of TPC`s in a high particle flux environment

    Energy Technology Data Exchange (ETDEWEB)

    Etkin, A.; Eiseman, S.E.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Lindenbaum, S.J. [Brookhaven National Lab., Upton, NY (United States); Chan, C.S.; Kramer, M.A.; Zhao, K.H.; Zhu, Y. [City College of New York, New York (United States); Hallman, T.J.; Madansky, L. [Johns Hopkins Univ., Baltimore, MD (United States); Ahmad, S.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Mutchler, G.S.; Roberts, J.B. [Bonner Nuclear Lab., Houston, TX (United States)

    1991-12-31

    TPC`s (Time Projection Chamber) used in E-810 at the TAGS (Alternating Gradient Synchrotron) were exposed to fluxes equivalent to more than 10 minimum ionizing particles per second to find if such high fluxes cause gain changes or distortions of the electric field. Initial results of these and other tests are presented and the consequences for the RHIC (Relativistic Heavy Ion Collider) TPC-based experiments are discussed.

  7. Historical and projected costs of natural disasters

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.

    1995-04-01

    Natural disasters cause billions of dollars of damage and thousands Of deaths globally each year. While the magnitude is clear, the exact costs (in damage and fatalities) are difficult to clearly identify. This document reports on the results of a survey of data on the costs associated with significant natural disasters. There is an impressive amount of work and effort going into natural disaster research, mitigation, and relief. However, despite this effort, there are surprisingly few consistent and reliable data available regarding the effects of natural disasters. Even lacking consistent and complete data, it is clear that the damage and fatalities from natural disasters are increasing, both in the United States, and globally. Projections using the available data suggest that, in the United States alone, the costs of natural disasters between 1995 and 2010 will be in the range of $90 billion (94$) and 5000 lives.

  8. ARIADNE, a Photographic LAr TPC at the CERN Neutrino Platform

    CERN Document Server

    Mavrokoridis, K; Nessi, M; Roberts, A; Smith, N A; Touramanis, C; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2016-01-01

    This letter of intent describes a novel and innovative two-phase LAr TPC with photographic capabilities as an attractive alternative readout method to the currently accepted segmented THGEMs which will require many thousands of charge readout channels for kton-scale two-phase TPCs. These colossal LAr TPCs will be used for the future long-baseline-neutrino-oscillation experiments. Optical readout also presents many other clear advantages over current readout techniques such as ease of scalability, upgrade, installation and maintenance, and cost effectiveness. This technology has already been demonstrated at the Liverpool LAr facility with the photographic capturing of cosmic muon tracks and single gammas using a 40-litre prototype. We have now secured ERC funding to develop this further with the ARIADNE programme. ARIADNE will be a 1-ton two-phase LAr TPC utilizing THGEM and EMCCD camera readouts in order to photograph interactions, allowing for track reconstruction and particle identification. We are request...

  9. Performance study of a GEM-TPC prototype using cosmic rays

    International Nuclear Information System (INIS)

    Li Yulan; Qi Huirong; Li Jin; Gao Yuanning; Li Yuanjing; Yang Zhenwei; Fujii, Keisuke; Matsuda, Takeshi

    2008-01-01

    Time projection chambers (TPCs) have been successfully used as the central tracking devices in a number of high-energy physics experiments. However, the performance requirements on TPCs for future high-energy physics experiments greatly exceed the abilities of traditional TPCs read out by multi-wire proportional chambers (MWPCs). Micro-pattern gas detectors (MPGDs), such as gas electron multipliers (GEMs) or micromegas, have great potential to improve TPC performance when used as readout detectors. In order to evaluate its feasibility, a GEM-based TPC prototype with a drift length up to 50 cm was designed. Measurements of the spatial resolution of cosmic-ray tracks without and with a magnetic field (B=1 T) are presented. A very good performance is achieved, matching the analytic formula for the spatial resolution of a MPGD-readout TPC. A dedicated study shows that the increase of GEM detector gain can improve the TPC's spatial resolution.

  10. Online calibration of the ALICE-TPC in LHC-Run 2

    Energy Technology Data Exchange (ETDEWEB)

    Vorobyev, Ivan [Technische Universitaet Muenchen, Excellence Cluster Universe (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    The Time Projection Chamber (TPC) is the main tracking detector at the ALICE Experiment at the LHC. Its performance and calibration directly influence the calibration of other detectors in the ALICE central barrel. To address this issue during the first LHC running period, a two-step offline calibration was employed, in which first the TPC and then the other detectors were calibrated. However, such a scheme will not be feasible for the Run 3 period, because the TPC will run in a continuous readout mode, producing a vast amount of data that needs to be significantly compressed on the fly for data storage. This will require the calibration step to run online within the High Level Trigger environment. In this talk, the online calibration concept and the implementation for the ALICE-TPC already in Run 2 are discussed.

  11. 10 CFR 611.102 - Eligible project costs.

    Science.gov (United States)

    2010-01-01

    ... Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to... 10 Energy 4 2010-01-01 2010-01-01 false Eligible project costs. 611.102 Section 611.102 Energy... PROGRAM Direct Loan Program § 611.102 Eligible project costs. (a) Eligible costs are: (1) Those costs that...

  12. The TPC shielding of the CAST experiment

    International Nuclear Information System (INIS)

    Ruz, J; Luzon, G; Beltran, B; Carmona, J M; Cebrian, S; Gomez, H; Irastorza, I G; Morales, J; Ortiz de Solorzano, A; RodrIguez, A; Villar, J A

    2006-01-01

    Sunset solar axions traversing the intense magnetic field of the CERN Axion Solar Telescope (CAST) experiment may be detected in a TPC detector, placed at one side of the magnet, as point-like X-rays signals. This signal could be masked, however, by the inhomogeneous radioactive background of materials and experimental site. Here we present the shielding built to reduce and homogenize the radioactive background levels of the TPC detector

  13. Cryogenic testing of the TPC superconducting solenoid

    International Nuclear Information System (INIS)

    Green, M.A.; Smits, R.G.; Taylor, J.D.

    1983-06-01

    This report describes the results of a series of tests on the TPC superconducting magnet cryogenic system which occurred during the winter and spring of 1983. The tests occurred at interaction region 2 of the PEP colliding beam facility at the Stanford Linear Accelerator Center (SLAC). The TPC Magnet Cryogenic System which was tested includes the following major components: a remote helium compressor with a full flow liquid nitrogen purification station, 400 meters of high pressure supply and low pressure return lines; and locally a CTi Model 2800 refrigerator with two Sulzer gas bearing turbines, the TPC magnet control dewar, 70 meters of transfer lines, and the TPC thin superconducting solenoid magnet. In addition, there is a conditioner (liquid nitrogen heat exchangers and gas heaters) system for cooldown and warmup of the magnet. This report describes the local cryogenic system and describes the various steps in the cooldown and operation of the TPC magnet. The tests were successful in that they showed that the TPC magnet could be cooled down in 24 hours and the magnet could be operated on the refrigerator or a helium pump with adequate cooling margin. The tests identified problems with the cryogenic system and the 2800 refrigerator. Procedures for successful operation and quenching of the superconducting magnet were developed. 19 references

  14. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  15. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  16. Slow Control System for the NIFFTE Collaboration TPC

    Science.gov (United States)

    Ringle, Erik; Niffte Collaboration Collaboration

    2011-10-01

    As world energy concerns continue to dominate public policy in the 21st century, the need for cleaner and more efficient nuclear power is necessary. In order to effectively design and implement plans for generation IV nuclear reactors, more accurate fission cross-section measurements are necessary. The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration, in an effort to meet this need, has constructed a Time Projection Chamber (TPC) which aims to reduce the uncertainty of the fission cross-section to less than 1%. Using the Maximum Integration Data Acquisition System (MIDAS) framework, slow control measurements are integrated into a single interface to facilitate off-site monitoring. The Hart Scientific 1560 Black Stack will be used with two 2564 Thermistor Scanner Modules to monitor internal temperature of the TPC. A Prologix GPIB to Ethernet controller will be used to interface the hardware with MIDAS. This presentation will detail the design and implementation of the slow control system for the TPC. This work was supported by the U.S. Department of Energy Division of Energy Research.

  17. GEM Foil Quality Assurance For The ALICE TPC Upgrade

    Directory of Open Access Journals (Sweden)

    Brücken Erik

    2018-01-01

    Full Text Available The ALICE (A Large Ion Collider Experiment experiment at the Large Hadron Collider (LHC at CERN is dedicated to heavy ion physics to explore the structure of strongly interacting matter. The Time Projection Chamber (TPC of ALICE is a tracking detector located in the central region of the experiment. It offers excellent tracking capabilities as well as particle identification. After the second long shutdown (LS2 the LHC will run at substantially higher luminosities. To be able to increase the data acquisition rate by a factor of 100, the ALICE TPC experiment has to replace the Multi-Wire Proportional Chamber (MWPC –based readout chambers. The MWPC are operated with gating grid that limits the rate to O(kHz. The new ReadOut Chamber (ROC design is based on Gas Electron Multiplier (GEM technology operating in continuous mode. The current GEM productions scheme foresees the production of more than 800 GEM foils of different types. To fulfill the requirements on the performance of the GEM TPC readout, necessitates thorough Quality Assurance (QA measures. The QA scheme, developed by the ALICE collaboration, will be presented in detail.

  18. AGS silicon gold collisions measured in the E-810 TPC

    International Nuclear Information System (INIS)

    Love, W.A.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Kruk, J.W.; Miettinen, H.E.; Mutchler, G.S.; Nessi, M.; Nessi-Tedaldi, F.; Roberts, J.B.; Chan, C.S.; Kramer, M.A.; Hallman, T.J.; Madansky, L.; Lindenbaum, S.J.

    1990-01-01

    The tracking detector of AGS Experiment 810 is a three-piece Time Projection Chamber (TPC) intended to measure all charged tracks in the forward hemisphere of the nucleon-nucleon center of mass system, i.e. forward of an angle of about 20 degrees in the lab. Each module of the TPC contains twelve rows of short anode wires which give 3-D space points on each track, but no dE/dx information useable for particle identification. The TPC was operated in a beam of silicon ions at the end of June 1989 and this talk reports the results of analysis of the data taken with a thin gold target in that run. The authors have gathered a similar amount of data from thin copper and silicon targets, the analysis of which is in a less advanced state. The results of the investigation of the neutral strange particle decays appear in a separate contribution by Al Saulys. This paper presents the current state of the analysis of the charged tracks from the silicon gold collisions

  19. Spatial resolution studies of a GEM-TPC

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Martin [TU Muenchen, 85748 Garching (Germany); Collaboration: GEM-TPC-Collaboration

    2015-07-01

    A GEM-TPC can exploit the intrinsic suppression of back drifting ions from the amplification stage of the GEM (Gas Electron Multiplier) foils to overcome the problem of drift-field distortions in an ungated operation. To explore the possibility of such a continuously running TPC (Time Projection Chamber) a large-size detector was built. This detector, with a drift length of 728 mm and a radius of 308 mm and a total of 10254 electronic channels, was designed as an upgrade for the FOPI experiment at GSI (Darmstadt, Germany) to improve the secondary vertex resolution especially for K{sup 0}{sub S}- and Λ-reconstruction and the PID capabilities. After commissioning a large statistics of cosmic data and beam-target reactions has been collected and the obtained tracks in the TPC have been used to improve the tracking algorithms. During the track finding and fitting procedure a clustering algorithm which takes into account the track topology as well as the full 3D spatial information is employed. The the clustering algorithm, the cluster error calculation and the tracking resolution are discussed in this contribution.

  20. Future Upgrade and Physics Perspectives of the ALICE TPC

    CERN Document Server

    INSPIRE-00033137

    The ALICE experiment at the Large Hadron Collider (LHC) proposes major detector upgrades to fully exploit the increase of the luminosity of the LHC in RUN~3 and to extend the physics reach for rare probes at low transverse momentum. The Time Projection Chamber (TPC) is one of the main tracking and PID devices in the central barrel of ALICE. The maximum trigger rate of the TPC is currently limited to about 3.5 kHz by the operation of a gating grid system. In order to make full use of the luminosity in RUN 3, the TPC is foreseen to be operated in an ungated mode with continuous readout. The existing MWPC readout will be replaced by a Micro-Pattern Gaseous Detector (MPGD) based readout, which provides intrinsic ion capture capability without gating. Extensive detector R\\&D employing Gas Electron Multiplier (GEM) and Micro-Mesh Gaseous detector (Micromegas) technologies, and simulation studies to advance the techniques for the corrections of space-charge distortions have been performed since 2012. In this pap...

  1. GEM Foil Quality Assurance For The ALICE TPC Upgrade

    Science.gov (United States)

    Brücken, Erik; Hildén, Timo

    2018-02-01

    The ALICE (A Large Ion Collider Experiment) experiment at the Large Hadron Collider (LHC) at CERN is dedicated to heavy ion physics to explore the structure of strongly interacting matter. The Time Projection Chamber (TPC) of ALICE is a tracking detector located in the central region of the experiment. It offers excellent tracking capabilities as well as particle identification. After the second long shutdown (LS2) the LHC will run at substantially higher luminosities. To be able to increase the data acquisition rate by a factor of 100, the ALICE TPC experiment has to replace the Multi-Wire Proportional Chamber (MWPC) -based readout chambers. The MWPC are operated with gating grid that limits the rate to O(kHz). The new ReadOut Chamber (ROC) design is based on Gas Electron Multiplier (GEM) technology operating in continuous mode. The current GEM productions scheme foresees the production of more than 800 GEM foils of different types. To fulfill the requirements on the performance of the GEM TPC readout, necessitates thorough Quality Assurance (QA) measures. The QA scheme, developed by the ALICE collaboration, will be presented in detail.

  2. The Readout Control Unit of the ALICE TPC

    CERN Document Server

    Lien, J A; Musa, L

    2004-01-01

    The ALICE Time Projection Chamber (TPC) is the main tracking detector of the central barrel of the ALICE (A Large Ion Collider) Experiment at the Large Hadron Collider (LHC), being constructed at CERN, Geneva. It is a 88 m$^{3}$ cylinder filled with gas and divided into two drift regions by the central electrode located at its axial center. The readout chambers of the TPC are multi-wire proportional chambers with cathode pad readout. About 570 000 pads are read-out by an electronics chain of amplification, digitalization and pre-processing. One of the challenges in designing the TPC for ALICE is the design of Front End Electronics (FEE) to cope with the data rates and the channel occupancy. The Readout Control Unit (RCU), which is presented in this work, is designed to control and monitor the Front End Electronics, and to collect and ship data to the High Level Trigger and the Data Acquisition System, via the Detector Data Link (DDL - optical fibre). The RCU must be capable of reading out up to 200 Mbytes/s f...

  3. Metal-core pad-plane development for ACTAR TPC

    Science.gov (United States)

    Giovinazzo, J.; Pibernat, J.; Goigoux, T.; de Oliveira, R.; Grinyer, G. F.; Huss, C.; Mauss, B.; Pancin, J.; Pedroza, J. L.; Rebii, A.; Roger, T.; Rosier, P.; Saillant, F.; Wittwer, G.

    2018-06-01

    With the recent development of active targets and time projection chambers (ACTAR TPC) as detectors for fundamental nuclear physics experiments, the need arose for charge collection planes with a high density of readout channels. In order to fulfill the mechanical constraints for the ACTAR TPC device, we designed a pad-plane based on a metal-core circuit with an conceptually simple design and routing for signal readout, named FAKIR (in reference to a fakir bed of nails). A test circuit has been equipped with a micro mesh gaseous structure (micromegas) for signal amplification and a dedicated readout electronics. Test measurements have been performed with an 55Fe X-ray source giving an intrinsic energy resolution (FWHM) of 22 ± 1% at 5 . 9 keV, and with a 3-alpha source for which a resolution of about 130 ± 20 keV at 4 . 8 MeV has been estimated. The pad-plane has been mounted into a reduced size demonstrator version of the ACTAR TPC detector, in order to illustrate charged particle track reconstruction. The tests preformed with the X-ray and the 3-alpha sources shows that results obtained from pads signals are comparable to the intrinsic result from the micro-mesh signal. In addition, a simple alpha particle tracks analysis is performed to demonstrate that the pad plane allows a precise reconstruction of the direction and length of the trajectories.

  4. A continuous read-out TPC for the ALICE upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Lippmann, C., E-mail: C.Lippmann@gsi.de

    2016-07-11

    The largest gaseous Time Projection Chamber (TPC) in the world, the ALICE TPC, will be upgraded based on Micro Pattern Gas Detector technology during the second long shutdown of the CERN Large Hadron Collider in 2018/19. The upgraded detector will operate continuously without the use of a triggered gating grid. It will thus be able to read all minimum bias Pb–Pb events that the LHC will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1 TByte/s. A fractional ion feedback of below 1% is required to keep distortions due to space charge in the TPC drift volume at a tolerable level. The new read-out chambers will consist of quadruple stacks of Gas Electron Multipliers (GEM), combining GEM foils with a different hole pitch. Other key requirements such as energy resolution and operational stability have to be met as well. A careful optimisation of the performance in terms of all these parameters was achieved during an extensive R&D program. A working point well within the design specifications was identified with an ion backflow of 0.63%, a local energy resolution of 11.3% (sigma) and a discharge probability comparable to that of standard triple GEM detectors.

  5. R and D of MPGD-readout TPC for the International Linear Collider experiment

    International Nuclear Information System (INIS)

    Yonamine, R

    2012-01-01

    A Time Projection Chamber (TPC) is chosen for the central tracker of the ILD detector, one of two detector concepts planned for the International Linear Collider (ILC). Physics goals at the ILC will require a TPC with a position resolution of 100 μm and superior track separation, which are not achievable with a conventional Multi-Wire Proportional Chamber (MWPC) readout. A MPGD readout offers improved position resolution and track separation due to measuring the signal at the anode and minimization of E × B effect. For several years, the LC TPC collaboration has been developing a MPGD readout using various small TPC prototypes and the Large Prototype TPC that is operated in a test beam at DESY. The MPGD technologies being tested are GEM and Micromegas with resistive charge broadening, with both traditional pad and CMOS pixel readout. Readout modules with both GEM and Micromegas gas amplification have achieved a position resolution on the order of 100 μm at B = 1 T. In this paper we report on the recent R and D toward the ILD TPC.

  6. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  7. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  8. Commissioning and calibration of the ALICE-TPC

    Energy Technology Data Exchange (ETDEWEB)

    Wiechula, Jens

    2009-04-21

    ALICE (A Large Ion Collider Experiment), is the dedicated heavy-ion experiment at the Large Hadron Collider (LHC) at CERN. It is optimised to reconstruct and identify the particles created in a lead-lead collision with a centre of mass energy of 5.5 TeV. The main tracking detector is a large-volume time-projection chamber (TPC). With an active volume of about 88m{sup 3} and a total readout area of 32.5 m{sup 2} it is the most challenging TPC ever build. A central electrode divides the 5 m long detector into two drift regions. Each readout side is subdivided into 18 inner and 18 outer multi-wire proportional read-out chambers. The readout area is subdivided into 557568 pads, where each pad is read out by an electronic chain. A complex calibration is needed in order to reach the design position-resolution of the reconstructed particle tracks of about 200 {mu}m. The work at hand presents results of the pedestal and noise behaviour of the front-end electronics (FEE), measurements of the pulse-shaping properties of the FEE using results obtained with a calibration pulser and measurements performed with the laser-calibration system. The data concerned were taken during two phases of the TPC commissioning. First measurements were performed in the clean room where the TPC was built. After the TPC was moved underground and built into the experiment, a second round of commissioning took place. Noise measurements in the clean room revealed a very large fraction of pads with noise values larger than the design specifications. Two modifications helped to reduce the 'ground bounce' effect: A desynchronisation in the the start of the readout of groups of channels and a modification in the grounding scheme of the FEE. Further noise measurements were carried out after the TPC has been moved to the experimental area underground. Here even a larger fraction of channels showed too large noise values. To study the shaping properties of the FEE a calibration pulser was used

  9. Commissioning and calibration of the ALICE-TPC

    International Nuclear Information System (INIS)

    Wiechula, Jens

    2009-01-01

    ALICE (A Large Ion Collider Experiment), is the dedicated heavy-ion experiment at the Large Hadron Collider (LHC) at CERN. It is optimised to reconstruct and identify the particles created in a lead-lead collision with a centre of mass energy of 5.5 TeV. The main tracking detector is a large-volume time-projection chamber (TPC). With an active volume of about 88m 3 and a total readout area of 32.5 m 2 it is the most challenging TPC ever build. A central electrode divides the 5 m long detector into two drift regions. Each readout side is subdivided into 18 inner and 18 outer multi-wire proportional read-out chambers. The readout area is subdivided into 557568 pads, where each pad is read out by an electronic chain. A complex calibration is needed in order to reach the design position-resolution of the reconstructed particle tracks of about 200 μm. The work at hand presents results of the pedestal and noise behaviour of the front-end electronics (FEE), measurements of the pulse-shaping properties of the FEE using results obtained with a calibration pulser and measurements performed with the laser-calibration system. The data concerned were taken during two phases of the TPC commissioning. First measurements were performed in the clean room where the TPC was built. After the TPC was moved underground and built into the experiment, a second round of commissioning took place. Noise measurements in the clean room revealed a very large fraction of pads with noise values larger than the design specifications. Two modifications helped to reduce the 'ground bounce' effect: A desynchronisation in the the start of the readout of groups of channels and a modification in the grounding scheme of the FEE. Further noise measurements were carried out after the TPC has been moved to the experimental area underground. Here even a larger fraction of channels showed too large noise values. To study the shaping properties of the FEE a calibration pulser was used. To generate signals in

  10. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  11. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  12. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  13. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  14. TPC track distortions IV: post tenebras lux

    CERN Document Server

    Ammosov, V; Boyko, I; Chelkov, G; Dedovitch, D; Dydak, F; Elagin, A; Gostkin, M; Guskov, A; Koreshev, V; Krumshtein, Z; Nefedov, Y; Nikolaev, K; Wotschack, J; Zhemchugov, A

    2007-01-01

    We present a comprehensive discussion and summary of static and dynamic track distortions in the HARP TPC in terms of physical origin, mathematical modelling and correction algorithms. `Static' distortions are constant with time, while `dynamic' distortions are distortions that occur only during the 400 ms long accelerator spill. The measurement of dynamic distortions, their mathematical modelling and the correction algorithms build on our understanding of static distortions. In the course of corroborating the validity of our static distortion corrections, their reliability and precision was further improved. Dynamic TPC distortions originate dominantly from the `stalactite' effect: a column of positive-ion charge starts growing at the begin of the accelerator spill, and continues growing with nearly constant velocity out from the sense-wire plane into the active TPC volume. However, the `stalactite' effect is not able to describe the distortions that are present already at the start of the spill and which ha...

  15. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  16. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  17. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  18. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  19. Cost comparison for REDC pretreatment project

    International Nuclear Information System (INIS)

    Robinson, S.M.; Homan, F.J.

    1997-06-01

    This analysis has been prepared to support the planned expenditure to provide the Radiochemical Engineering Development Center (REDC) with the capability to pretreat their liquid low-level waste (LLLW) before discharging it to the Oak Ridge National Laboratory (ORNL) LLLW system. Pretreatment will remove most of the radioactivity, particularly the transuranic isotopes and Cs-137 from the waste to be discharged. This will render the supernates that accumulate in the storage tanks low-activity Class B low-level wastes rather than high-activity Class B or Class C wastes. The sludges will be Class C rather than remote-handled transuranic (RH-TRU) wastes. When REDC wastes are commingled with other ORNL LLLW, the present-worth treatment and transport costs are higher by a factor of 1.3 for the no-pretreatment cases. This result is consistent with data from similar studies conducted at other sites. Based on the information presented in this analysis, the recommendation is to proceed with REDC treatment projects

  20. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  1. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  2. Particle Identification Studies with an ALICE Test TPC

    CERN Document Server

    Christiansen, P

    2007-01-01

    Using a test TPC, consisting of the ALICE TPC field cage prototype in combination with the final ALICE TPC readout and electronics, the energy loss distribution and resolution were measured for identified protons. The measurements were compared to theoretical calculations and good quantitative agreement was found when detector effects were taken into account. The implications for particle identification are discussed.

  3. Data links for the EOS TPC

    International Nuclear Information System (INIS)

    Bieser, F.; Jones, R.; McParland, C.

    1991-01-01

    This paper reports on the design and performance of high speed data links and slower configuration control links used between the EOS TPC detector and the data processing electronics. Data rates of 5 MBytes/link are maintained over 30m with optical isolation. Pedestal subtraction, hit detection, and data reordering are performed online

  4. Data links for the EOS TPC

    International Nuclear Information System (INIS)

    Bieser, F.; Jones, R.; McParland, C.

    1990-10-01

    We report on the design and performance of high speed data links and slower configuration control links used between the EOS TPC detector and the data processing electronics. Data rates of 5MBytes/s/link are maintained over 30m with optical isolation. Pedestal subtraction, hit detection, and data reordering are performed online. 3 refs., 1 fig

  5. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  6. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  7. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  8. Noise Characterization and Filtering in the MicroBooNE Liquid Argon TPC

    Energy Technology Data Exchange (ETDEWEB)

    Acciarri, R.; et al.

    2017-05-20

    The low-noise operation of readout electronics in a liquid argon time projection chamber (LArTPC) is critical to properly extract the distribution of ionization charge deposited on the wire planes of the TPC, especially for the induction planes. This paper describes the characteristics and mitigation of the observed noise in the MicroBooNE detector. The MicroBooNE's single-phase LArTPC comprises two induction planes and one collection sense wire plane with a total of 8256 wires. Current induced on each TPC wire is amplified and shaped by custom low-power, low-noise ASICs immersed in the liquid argon. The digitization of the signal waveform occurs outside the cryostat. Using data from the first year of MicroBooNE operations, several excess noise sources in the TPC were identified and mitigated. The residual equivalent noise charge (ENC) after noise filtering varies with wire length and is found to be below 400 electrons for the longest wires (4.7 m). The response is consistent with the cold electronics design expectations and is found to be stable with time and uniform over the functioning channels. This noise level is significantly lower than previous experiments utilizing warm front-end electronics.

  9. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  10. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  11. Drift velocity studies at a time projection chamber for various water contents in the gas mixture; Driftgeschwindigkeitsstudien an einer Zeit-Projektions-Kammer (TPC) bei unterschiedlichen Wassergehalten des Kammergases

    Energy Technology Data Exchange (ETDEWEB)

    Stoever, F.W.

    2007-03-15

    For the answer of different open questions in high energy physics the construction of a linear e{sup +}e{sup -} collider with a c. m. energy of up to one TeV is prepared. With this is connected a comprehensive development on detectors, which must satisfy the requirements of the planned experiments. For the track chamber a TPC is considered. Hereby it deals with a gas-based concept, which has already been proved in past experiments and which is at time further developed by means of test chambers. The composition of the gas mixtureplays hereby an important role. Impurities of the gas mixture, especially by oxygen and water from the ambient air are a fact, which occurs every time in the development phase and can scarcely be avoided. From this arose the motivation to study directly the effects of this impurities. The object of the present thesis are correlations between drift velocity and water content in the chamber gas of a TPC.

  12. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  13. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  14. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  15. Studies on GEM modules for a large prototype TPC for the ILC

    International Nuclear Information System (INIS)

    Tsionou, Dimitra

    2016-12-01

    The International Linear Collider (ILC) is a future electron-positron collider with centre of mass energy of 500-1000 GeV. The International Large Detector (ILD) is one of two detector concepts at the ILC. Its high precision tracking system consists of Silicon sub-detectors and a Time Projection Chamber (TPC) equipped with micro-pattern gas detectors (MPGDs). Within the framework of the LCTPC collaboration, a Large Prototype (LP) TPC has been built as a demonstrator. This prototype has been equipped with Gas Electron Multiplier (GEM) modules and studied with electron beams of energies 1-6 GeV at the DESY test beam facility. The performance of the prototype detector and the extrapolation to the ILD TPC is presented here. In addition, ongoing optimisation studies and R and D; activities in order to prepare the next GEM module iteration are discussed.

  16. Studies on GEM modules for a Large Prototype TPC for the ILC

    Energy Technology Data Exchange (ETDEWEB)

    Tsionou, Dimitra, E-mail: dimitra.tsionou@desy.de

    2017-02-11

    The International Linear Collider (ILC) is a future electron–positron collider with centre of mass energy of 500–1000 GeV. The International Large Detector (ILD) is one of two detector concepts at the ILC. Its high precision tracking system consists of Silicon sub-detectors and a Time Projection Chamber (TPC) equipped with micro-pattern gas detectors (MPGDs). Within the framework of the LCTPC collaboration, a Large Prototype (LP) TPC has been built as a demonstrator. This prototype has been equipped with Gas Electron Multiplier (GEM) modules and studied with electron beams of energies 1–6 GeV at the DESY test beam facility. The performance of the prototype detector and the extrapolation to the ILD TPC is presented here. In addition, ongoing optimisation studies and R&D activities in order to prepare the next GEM module iteration are discussed.

  17. Construction and testing of the two meter diameter TPC thin superconducting solenoid

    International Nuclear Information System (INIS)

    Green, M.A.; Eberhard, P.H.; Ross, R.R.; Taylor, J.D.

    1979-08-01

    High energy colliding beam physics often requires large detectors which contain large volumes of magnetic field. The TPC (Time Projection Chamber) experiment at PEP will use a 1.5T magnetic field within a cylindrical volume which is 2.04m in diameter bounded by iron poles which are separated by a gap of 3.25m. The TPC magnet, built in 1979 by the Lawrence Berkeley Laboratory (LBL), is the largest high current density superconducting magnet built to date. It is designed to operate at a current density of 7 x 10 8 Am -2 and a stored energy of 11MJ, and it is protected by shorted secondary windings during a quench. The paper describes the basic parameters of the TPC magnet and the results of the first subassembly tests at LBL

  18. Studies on GEM modules for a Large Prototype TPC for the ILC

    International Nuclear Information System (INIS)

    Tsionou, Dimitra

    2017-01-01

    The International Linear Collider (ILC) is a future electron–positron collider with centre of mass energy of 500–1000 GeV. The International Large Detector (ILD) is one of two detector concepts at the ILC. Its high precision tracking system consists of Silicon sub-detectors and a Time Projection Chamber (TPC) equipped with micro-pattern gas detectors (MPGDs). Within the framework of the LCTPC collaboration, a Large Prototype (LP) TPC has been built as a demonstrator. This prototype has been equipped with Gas Electron Multiplier (GEM) modules and studied with electron beams of energies 1–6 GeV at the DESY test beam facility. The performance of the prototype detector and the extrapolation to the ILD TPC is presented here. In addition, ongoing optimisation studies and R&D activities in order to prepare the next GEM module iteration are discussed.

  19. 10 CFR 609.12 - Project Costs.

    Science.gov (United States)

    2010-01-01

    ... to meet market requirements, reasonably required reserve funds and other carrying costs during... corporation or affiliated entity assessments, including organizational expenses; (3) Goodwill, franchise...

  20. Selecting and Ranking Cost Research Projects

    Science.gov (United States)

    1993-09-01

    Model (STACM) Enhancements Automated Cost Estimating Integrated Tools ( ACEIT ) Libraries BM/C 3 GEP Engineering and Cost BM/C 3 EP Engineering and Cost...50K NOM VHI 0.02635481 STACM ENHANCEMENTS NOM អK NOM VHI 0.02468682 ACEIT LIBRARIES VHI 50-IOOK HI VHI 0.06357704 GEP ENGRG. & COST VHI 100-150K VHl...0.02505922 SCATS LOW អK NOM VIII 0.02468682 PICES SUPPORT NOM 50-100K NOM VlIl 0.02455186 ACEIT SUPPORT VIII 50-100K VHI VHI 0.08208244 GUARDIAN

  1. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  2. A Second Opinion is Worth the Cost - 12479

    Energy Technology Data Exchange (ETDEWEB)

    Madsen, Drew [Project Time and Cost Inc. (United States)

    2012-07-01

    This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil

  3. Projected cost comparison of nuclear electricity

    International Nuclear Information System (INIS)

    Juhn, P.E.; Hu, C.W.

    2000-01-01

    Comparison of electricity generation costs has been done in the late years through a large co-operation between several organisations. The studies are aiming to provide reliable comparison of electricity generating costs of nuclear and conventional base load power plants. This paper includes the result of the joint IAEA/OECD study published in 1997. (author)

  4. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  5. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  6. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  7. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  8. T2K Liquid Argon TPC

    Science.gov (United States)

    Meregaglia, Anselmo

    2006-09-01

    A 2 km LAr detector would be an important asset for the T2K experiment since it would play an important part in reducing the systematics and improving the ultimate θ sensitivity. It would also be an important milestone for the LAr TPC technique, providing in-situ R&D and paving the way for future large LAr detectors. Its main features are discussed in this talk.

  9. T2K Liquid Argon TPC

    International Nuclear Information System (INIS)

    Meregaglia, Anselmo

    2006-01-01

    A 2 km LAr detector would be an important asset for the T2K experiment since it would play an important part in reducing the systematics and improving the ultimate θ 13 sensitivity. It would also be an important milestone for the LAr TPC technique, providing in-situ R and D and paving the way for future large LAr detectors. Its main features are discussed in this talk

  10. Analysis of HARP TPC krypton data

    CERN Document Server

    Dydak, F

    2004-01-01

    This memo describes the procedure which was adopted to equalize the response of the 3972 pads of the HARP TPC, using radioactive 83mKr gas. The results obtained from the study of reconstructed krypton clusters in the calibration data taken in 2002 are reported. Two complementary methods were employed in the data analysis. Compatible results were obtained for channel-to-channel equalization constants. An estimate of the overall systematic uncertainty was derived.

  11. Momentum scale in the HARP TPC

    CERN Document Server

    Catanesi, M G; Edgecock, R; Ellis, M; Soler, F J P; Gössling, C; Bunyatov, S; Krasnoperov, A; Popov, B; Serdiouk, V; Tereschenko, V; Di Capua, E; Vidal-Sitjes, G; Artamonov, A; Giani, S; Gilardoni, S; Gorbunov, P; Grant, A; Grossheim, A; Ivanchenko, V; Kayis-Topaksu, A; Panman, J; Papadopoulos, I; Chernyaev, E; Tsukerman, I; Veenhof, R; Wiebusch, C; Zucchelli, P; Blondel, A; Borghi, S; Morone, M C; Prior, G; Schroeter, R; Meurer, C; Gastaldi, Ugo; Mills, G B; Graulich, J S; Grégoire, G; Bonesini, M; Ferri, F; Kirsanov, M; Bagulya, A; Grichine, V; Polukhina, N; Palladino, V; Coney, L; Schmitz, D; Barr, G; De Santo, A; Bobisut, F; Gibin, D; Guglielmi, A; Mezzetto, M; Dumarchez, J; Dore, U; Orestano, D; Pastore, F; Tonazzo, A; Tortora, L; Booth, C; Howlett, L; Bogomilov, M; Chizhov, M; Kolev, D; Tsenov, R; Piperov, S; Temnikov, P; Apollonio, M; Chimenti, P; Giannini, G; Burguet-Castell, J; Cervera-Villanueva, A; Gómez-Cadenas, J J; Martín-Albo, J; Novella, P; Sorel, M

    2007-01-01

    Recently a claim was made that the reconstruction of the large angle tracks in the HARP TPC was affected by a momentum bias as large as 15% at 500 MeV/c transverse momentum. In the following we recall the main issues with the momentum measurement in the HARP TPC, and describe the cross-checks made to validate the momentum scale. Proton-proton elastic scattering data off the hydrogen target are used to alibrate the momentum of charged particles with a precision evaluated to be 3.5%. A full description of the time development of the dynamic distortions in the TPC during physics spills is now available together with a correction algorithm. This allows a new cross-check using an enlarged data set made by comparing positive and negative pion elasticscattering data collected with negative polarity of the solenoid magnet. These data confirm the absence of a bias in the sagitta measurement. The dE/dx versus momentum curves are revisited, and shown to provide a confirmation that the HARP momentum calibration is correc...

  12. Least cost analysis of renewable energy projects

    International Nuclear Information System (INIS)

    Cosgrove-Davies, M.; Cabraal, A.

    1994-01-01

    This paper describes the methodology for evaluating dispersed and centralized rural energy options on a least cost basis. In defining the load to be served, each supply alternative must provide equivalent levels of service. The village to be served is defined by the number of loads, load density, distance from the nearest power distribution line, and load growth. Appropriate rural energy alternatives are identified and sized to satisfy the defined load. Lastly, a net present value analysis (including capital, installation, O and M, fuel, and replacement costs, etc.) is performed to identify the least cost option. A spreadsheet-based analytical tool developed by the World Bank's Asia Alternative Energy Unit (ASTAE) incorporates this approach and has been applied to compare photovoltaic solar home systems with other rural energy supply options in Indonesia. Load size and load density are found to be the critical factors in choosing between a grid and off-grid solution

  13. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  14. Projected costs of generating electricity - 2005 update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut 'winner'. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. 24 figs., 38 tabs., 11 apps.

  15. A micromegas-based TPC for the International Linear Collider

    International Nuclear Information System (INIS)

    Bhattacharya, Deb Sankar; Mukhopadhyay, Supratik; Majumdar, Nayana; Sarkar, Sandip; Bhattacharya, Sudeb; Bhattacharya, Purba; Colas, Paul; Attié, David; Ganjour, Serguei; Bhattacharya, Aparajita

    2016-01-01

    One of the two detector concepts for the ILC is the International Large Detector (ILD). The central tracking at the ILD is foreseen to be accomplished by a TPC (the ILD-TPC). A TPC has the benefits of truly continuous 3-D tracking and robust pattern recognition. In the baseline design, the length and the diameter of the ILD-TPC are 4.6 m and 3.6 m respectively. It will work in a 3.5 T magnetic field. Micromegas is a promising candidate for the ILD-TPC. Like any other MPGD, track reconstruction at the LPTPC with Micromegas has challenges. The electric field inhomogeneity near the gap between the modules results in track distortion and affects the performance of the TPC. The causes and effects of this distortion have been thoroughly studied by numerical methods. The results match closely with experiment. Possible hardware modifications to mitigate distortion effect have been explored in simulation

  16. Costing Future Complex and Novel Projects

    Science.gov (United States)

    2016-04-30

    Defence Science and Technology Laboratory (DSTL) is reported. The work involves pioneering data collection, analysis, and tool development to support... philosophy of the work and future prospects for its wider application. Summary The United Kingdom National Audit Office Major Projects Report 2014 states...the work will be in tackling variety in the data collected, one of the “3 Vs ” of Big Data. The outline programme is shown in Figure 2. Programme

  17. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  18. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  19. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  20. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  1. A large area Micromegas TPC for tracking at the ILC

    International Nuclear Information System (INIS)

    Wang, Wenxin

    2013-01-01

    The study of the fundamental building blocks of matter necessitates always more powerful accelerators. New particles are produced in high energy collisions of protons or electrons. The by-Products of these collisions are detected in large apparatus surrounding the interaction point. The 125 GeV Higgs particle discovered at LHC will be studied in detail in the next e + e - collider. The leading project for this is called ILC. The team that I joined is working on the R and D for a Time Projection Chamber (TPC) to detect the charged tracks by the ionization they leave in a gas volume, optimised for use at ILC. This primary ionization is amplified by the so-Called Micromegas device, with a charge-Sharing anode made of a resistive-Capacitive coating. After a presentation of the physics motivation for the ILC and ILD detector, I will review the principle of operation of a TPC (Chapter 2) and underline the advantages of the Micromegas readout with charge sharing. The main part of this PhD work concerns the detailed study of up to 12 prototypes of various kinds. The modules and their readout electronics are described in Chapter 3. A test-Bench setup has been assembled at CERN (Chapter 4) to study the response to a 55 Fe source, allowing an energy calibration and a uniformity study. In Chapter 5, the ion back-flow is studied using a bulk Micromegas and the gas gain is measured using a calibrated electronics chain. With the same setup, the electron transparency is measured as a function of the field ratio (drift/amplification). Also, several beam tests have been carried out at DESY with a 5 GeV electron beam in a 1 T superconducting magnet. These beam tests allowed the detailed study of the spatial resolution. In the final test, the endplate was equipped with seven modules, bringing sensitivity to misalignment and distortions. Such a study required software developments (Chapter 6) to make optimal use of the charge sharing and to reconstruct multiple tracks through several

  2. Optimized iterative decoding method for TPC coded CPM

    Science.gov (United States)

    Ma, Yanmin; Lai, Penghui; Wang, Shilian; Xie, Shunqin; Zhang, Wei

    2018-05-01

    Turbo Product Code (TPC) coded Continuous Phase Modulation (CPM) system (TPC-CPM) has been widely used in aeronautical telemetry and satellite communication. This paper mainly investigates the improvement and optimization on the TPC-CPM system. We first add the interleaver and deinterleaver to the TPC-CPM system, and then establish an iterative system to iteratively decode. However, the improved system has a poor convergence ability. To overcome this issue, we use the Extrinsic Information Transfer (EXIT) analysis to find the optimal factors for the system. The experiments show our method is efficient to improve the convergence performance.

  3. How to Advance TPC Benchmarks with Dependability Aspects

    Science.gov (United States)

    Almeida, Raquel; Poess, Meikel; Nambiar, Raghunath; Patil, Indira; Vieira, Marco

    Transactional systems are the core of the information systems of most organizations. Although there is general acknowledgement that failures in these systems often entail significant impact both on the proceeds and reputation of companies, the benchmarks developed and managed by the Transaction Processing Performance Council (TPC) still maintain their focus on reporting bare performance. Each TPC benchmark has to pass a list of dependability-related tests (to verify ACID properties), but not all benchmarks require measuring their performances. While TPC-E measures the recovery time of some system failures, TPC-H and TPC-C only require functional correctness of such recovery. Consequently, systems used in TPC benchmarks are tuned mostly for performance. In this paper we argue that nowadays systems should be tuned for a more comprehensive suite of dependability tests, and that a dependability metric should be part of TPC benchmark publications. The paper discusses WHY and HOW this can be achieved. Two approaches are introduced and discussed: augmenting each TPC benchmark in a customized way, by extending each specification individually; and pursuing a more unified approach, defining a generic specification that could be adjoined to any TPC benchmark.

  4. BIM cost analysis of transport infrastructure projects

    Science.gov (United States)

    Volkov, Andrey; Chelyshkov, Pavel; Grossman, Y.; Khromenkova, A.

    2017-10-01

    The article describes the method of analysis of the energy costs of transport infrastructure objects using BIM software. The paper consideres several options of orientation of a building using SketchUp and IES VE software programs. These options allow to choose the best direction of the building facades. Particular attention is given to a distribution of a temperature field in a cross-section of the wall according to the calculation made in the ELCUT software. The issues related to calculation of solar radiation penetration into a building and selection of translucent structures are considered in the paper. The article presents data on building codes relating to the transport sector, on the basis of which the calculations were made. The author emphasizes that BIM-programs should be implemented and used in order to optimize a thermal behavior of a building and increase its energy efficiency using climatic data.

  5. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  6. Projected Lifetime Healthcare Costs Associated with HIV Infection

    DEFF Research Database (Denmark)

    Nakagawa, Fumiyo; Miners, Alec; Smith, Colette J

    2015-01-01

    computer simulation model to project the distribution of lifetime outcomes and costs of men-who-have-sex-with-men (MSM) infected with HIV in 2013 aged 30, over 10,000 simulations. We assumed a resource-rich setting with no loss to follow-up, and that standards and costs of healthcare management remain...

  7. The liquid argon TPC for the ICARUS experiment

    CERN Document Server

    Arneodo, F

    1997-01-01

    The ICARUS project aims at the realisation of a large liquid argon TPC to be run at the Underground Laboratories of Gran Sasso in Italy. An intense R&D; activity has put on firm grounds this new detector technology and experimentally confirmed its feasibility on a few ton scale. Based on these solid achievements, the collaboration is now confident of being able to build and safely operate a multi-kton detector. The reseach program of the experiment involves the systematic study of a wide spectrum of physical phenomena covering many orders of magnitude in the energy deposited in the detector: from the few MeV of solar neutrino interactions, to the about one GeV of the proton decay and atmospheric neutrinos, up to the higher energies of neutrinos from accelerators.

  8. Future prospects of the TPC idea

    Energy Technology Data Exchange (ETDEWEB)

    Nygren, D R [California Univ., Berkeley (USA). Lawrence Berkeley Lab.

    1981-04-01

    General aspects affecting TPC size, readout plane characteristics and operation in the LEP environment are presented, with the general conclusion that modest improvements relative to PEP-4 can be realized in several areas. The problem of positive ion reduction is discussed according to two qualitatively new operating modes, asynchronous and synchronous gating. Either gating mode appears to offer a means to eliminate almost completely the ion return flux. Some speculative ideas involving 3-component gas mixtures, low-mass components and parallel plane geometry are presented as future possibilities.

  9. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  10. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  11. Performance Evaluation of the COBRA GEM for the Application of the TPC

    Science.gov (United States)

    Terasaki, Kohei; Hamagaki, Hideki; Gunji, Taku; Yamaguchi, Yorito

    2014-09-01

    Suppression of the back-drifting ions from avalanche region to drift space (IBF: Ion Backflow) is the key for a Time Projection Chamber (TPC) since IBF easily distorts the drift field. To suppress IBF, Gating Grid system is widely used for the TPC but this limits the data taking rate. Gas Electron Multiplier (GEM) has advantages in the reduction of IBF and high rate capability. By adopting GEM, it is possible to run a TPC continuously under high rate and high multiplicity conditions. Motivated by the study of IBF reduction for RICH with Thick COBRA, which has been developed by F. A. Amero et al., we developed COBRA GEMs for the application of a TPC. With a stack configuration, IBF reaches about 0.1 ~ 0.5%, which is ×5--10 better IBF than the standard GEMs. However, the measured energy resolution with COBRA is 20% (σ) and this is much worse than the resolution with standard GEMs. Measurement of long-time stability of gain indicates that gain of COBRA varies significantly due to charging up effect. Simulation studies based on Garfield++ are performed for understanding quantitatively the reasons of worse energy resolution and instability of gain. In this presentation, we will report the simulation studies together with the measured performance of the COBRA GEM.

  12. Simulation of space-charge effects in an ungated GEM-based TPC

    Energy Technology Data Exchange (ETDEWEB)

    Böhmer, F.V., E-mail: felix.boehmer@tum.de; Ball, M.; Dørheim, S.; Höppner, C.; Ketzer, B.; Konorov, I.; Neubert, S.; Paul, S.; Rauch, J.; Vandenbroucke, M.

    2013-08-11

    A fundamental limit to the application of Time Projection Chambers (TPCs) in high-rate experiments is the accumulation of slowly drifting ions in the active gas volume, which compromises the homogeneity of the drift field and hence the detector resolution. Conventionally, this problem is overcome by the use of ion-gating structures. This method, however, introduces large dead times and restricts trigger rates to a few hundred per second. The ion gate can be eliminated from the setup by the use of Gas Electron Multiplier (GEM) foils for gas amplification, which intrinsically suppress the backflow of ions. This makes the continuous operation of a TPC at high rates feasible. In this work, Monte Carlo simulations of the buildup of ion space charge in a GEM-based TPC and the correction of the resulting drift distortions are discussed, based on realistic numbers for the ion backflow in a triple-GEM amplification stack. A TPC in the future P{sup ¯}ANDA experiment at FAIR serves as an example for the experimental environment. The simulations show that space charge densities up to 65 fC cm{sup −3} are reached, leading to electron drift distortions of up to 10 mm. The application of a laser calibration system to correct these distortions is investigated. Based on full simulations of the detector physics and response, we show that it is possible to correct for the drift distortions and to maintain the good momentum resolution of the GEM-TPC.

  13. Simulation of space-charge effects in an ungated GEM-based TPC

    International Nuclear Information System (INIS)

    Böhmer, F.V.; Ball, M.; Dørheim, S.; Höppner, C.; Ketzer, B.; Konorov, I.; Neubert, S.; Paul, S.; Rauch, J.; Vandenbroucke, M.

    2013-01-01

    A fundamental limit to the application of Time Projection Chambers (TPCs) in high-rate experiments is the accumulation of slowly drifting ions in the active gas volume, which compromises the homogeneity of the drift field and hence the detector resolution. Conventionally, this problem is overcome by the use of ion-gating structures. This method, however, introduces large dead times and restricts trigger rates to a few hundred per second. The ion gate can be eliminated from the setup by the use of Gas Electron Multiplier (GEM) foils for gas amplification, which intrinsically suppress the backflow of ions. This makes the continuous operation of a TPC at high rates feasible. In this work, Monte Carlo simulations of the buildup of ion space charge in a GEM-based TPC and the correction of the resulting drift distortions are discussed, based on realistic numbers for the ion backflow in a triple-GEM amplification stack. A TPC in the future P ¯ ANDA experiment at FAIR serves as an example for the experimental environment. The simulations show that space charge densities up to 65 fC cm −3 are reached, leading to electron drift distortions of up to 10 mm. The application of a laser calibration system to correct these distortions is investigated. Based on full simulations of the detector physics and response, we show that it is possible to correct for the drift distortions and to maintain the good momentum resolution of the GEM-TPC

  14. Particle Identification in Jets and High-Multiplicity pp Events with the ALICE TPC

    CERN Document Server

    AUTHOR|(SzGeCERN)683272; Vogelsang, Werner

    The spectra of identified particles in a collision experiment comprise crucial information about the underlying physical processes. The ALICE experiment has powerful Particle IDentification (PID) capabilities, which are unique at the Large Hadron Collider (LHC). In this thesis, a statistical PID method based on the specific energy loss d$E$/d$x$ in the ALICE Time Projection Chamber (TPC) is developed: the TPC Multi-Template Fit (MTF). The MTF allows for the extraction of identified charged particle spectra in a wide momentum range, which extends from about 150 MeV/$c$ to above 20 GeV/$c$. The TPC PID requires a detailed modelling of the TPC d$E$/d$x$ response for momenta above 2-3 GeV/$c$. A framework is developed that allows for the determination of the model parameters and for evaluating the PID information of charged particles. With the MTF, the transverse momentum $p_{\\mathrm{T}}$ spectra of charged pions, kaons and protons at mid-rapidity ($|\\eta| < 0.9$) are measured for pp collisions at $\\sqrt{s}$ ...

  15. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  16. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  17. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  18. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  19. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  20. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  1. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  2. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  3. The ALICE TPC, a high resolution device for ultra-high particle multiplicities. Past, present and future

    Energy Technology Data Exchange (ETDEWEB)

    Ivanov, Marian [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    The Time Projection Chamber (TPC) of the ALICE apparatus is a large 3-dimensional tracking and particle identification device for ultra-high multiplicity collision events. It has been operated successfully at the Large Hadron Collider (LHC) at CERN, recording data from pp, p-Pb, and Pb-Pb collisions. Presently, LHC is in its first long shutdown (LS1), the next round of data taking will start in summer 2015 at or close to the LHC design energy and luminosity. During the second long shutdown (LS2), LHC will undergo a further increase in the Pb-Pb luminosity together with a major upgrade of ALICE. After the upgrade, the ALICE TPC will operate with Pb-Pb collisions at an interaction rate of 50 kHz. We present the performance in operation, calibration and reconstruction with the ALICE TPC together with ongoing work and plans for the near future and the coming 10 years.

  4. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  5. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  6. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  7. Development of the GEM-TPC X-ray Polarimeter with the Scalable Readout System

    Directory of Open Access Journals (Sweden)

    Kitaguchi Takao

    2018-01-01

    Full Text Available We have developed a gaseous Time Projection Chamber (TPC containing a single-layered foil of a gas electron multiplier (GEM to open up a new window on cosmic X-ray polarimetry in the 2–10 keV band. The micro-pattern TPC polarimeter in combination with the Scalable Readout System produced by the RD51 collaboration has been built as an engineering model to optimize detector parameters and improve polarimeter sensitivity. The polarimeter was characterized with unpolarized X-rays from an X-ray generator in a laboratory and polarized X-rays on the BL32B2 beamline at the SPring-8 synchrotron radiation facility. Preliminary results show that the polarimeter has a comparable modulation factor to a prototype of the flight one.

  8. Results from tests of the Delphi TPC prototype

    International Nuclear Information System (INIS)

    Vilanova, D.

    1985-01-01

    Results from beam tests of a half-scale sector of the Delphi TPC are presented. The spatial resolution is slightly higher than predicted by Monte Carlo simulations, corresponding to an average value of about 300 μm. (orig.)

  9. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  10. Alcoholism treatment and medical care costs from Project MATCH.

    Science.gov (United States)

    Holder, H D; Cisler, R A; Longabaugh, R; Stout, R L; Treno, A J; Zweben, A

    2000-07-01

    This paper examines the costs of medical care prior to and following initiation of alcoholism treatment as part of a study of patient matching to treatment modality. Longitudinal study with pre- and post-treatment initiation. The total medical care costs for inpatient and outpatient treatment for patients participating over a span of 3 years post-treatment. Three treatment sites at two of the nine Project MATCH locations (Milwaukee, WI and Providence, RI). Two hundred and seventy-nine patients. Patients were randomly assigned to one of three treatment modalities: a 12-session cognitive behavioral therapy (CBT), a four-session motivational enhancement therapy (MET) or a 12-session Twelve-Step facilitation (TSF) treatment over 12 weeks. Total medical care costs declined from pre- to post-treatment overall and for each modality. Matching effects independent of clinical prognosis showed that MET has potential for medical-care cost-savings. However, patients with poor prognostic characteristics (alcohol dependence, psychiatric severity and/or social network support for drinking) have better cost-savings potential with CBT and/or TSF. Matching variables have significant importance in increasing the potential for medical-care cost-reductions following alcoholism treatment.

  11. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  12. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  13. A radiation tolerance study of the ALICE TPC Readout Control Unit 2

    CERN Document Server

    Zhao, Chengxin; Balk, Helge; Alme, Johan

    2017-11-17

    ALICE is a general-purpose detector that is designed to study the physics of quark-gluon plasma. The Time Projection Chamber (TPC) is one of the major detectors of ALICE. The TPC electronics consists of 4356 Front-end cards (FECs), which are controlled by 216 Readout Control Units (RCU). Each RCU connects to between 18 and 25 FECs using a multi-drop bus. In LHC Run1, the Readout Control Unit 1 (RCU1) performed even better than specification. However, in Run2 the energy of colliding beams is increased from 8 TeV to 14 TeV (maximum value) and higher luminosity, which leads to larger event size and higher radiation load on the electronics. As a solution, the Readout Control Unit 2 (RCU2) is designed to provide faster readout speed and improved radiation tolerance with respect to the RCU1. The RCU2 is conceptually similar to the RCU1 and it reuses the existing infrastructure and readout architecture of the TPC electronics. However, the multi-drop bus is split into four branches from the two branches and the bandw...

  14. Search for H-dibaryon at J-PARC with a Large Acceptance TPC

    Directory of Open Access Journals (Sweden)

    Sako H.

    2014-03-01

    Full Text Available H-dibaryon has been predicted as a stable 6-quark color-singlet state. It has been searched for by many experiments but has never been discovered. Recent lattice QCD calculations predict H-dibaryon as a weakly bound or a resonant state close to the LL threshold. E224 and E522 experiments at KEK observed peaks in LL invariant mass spectra near the threshold in (K-, K+ reactions, which were statistically not significant. Therefore, we proposed a new experiment E42 at J-PARC. It will measure decay products of ΛΛ and Λπ-p in a (K-, K+ reaction. We design a large acceptance spectrometer based on a Time Projection Chamber (TPC immersed in a dipole magnetic field. The TPC surrounds a target to cover nearly 4π acceptance, and accepts K- beams up to 106 counts per second. To suppress drift field distortion at high beam rates, we adopt Gas Electron Multipliers (GEMs for electron amplification and a gating grid. We show an overview of the experiment, the design of the spectrometer, and the R&D status of the TPC prototype.

  15. Studies of characteristics of triple GEM detector for the ALICE-TPC upgrade

    International Nuclear Information System (INIS)

    Patra, Rajendra Nath; Singaraju, R.N.; Ahammed, Z.; Nayak, T.K.; Biswas, S.

    2015-01-01

    Gas Electron Multiplier (GEM) is a novel gas detector in the field of radiation detection. GEM detectors have tremendous advantages over other types gas detectors like high rate handling capability with high efficiency and very low ion back flow (IBF). These detectors are most suitable for the use in the future experiments in high-energy proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) at CERN and Facility for Antiproton and Ion Research (FAIR) at GSI. A Large Ion Collider Experiment (ALICE) at the LHC is a dedicated experiment for the study of Quark Gluon Plasma (QGP). In few years, the data taking rate for Pb-Pb collisions will increase by 100 times to 50 KHz. The ALICE Time Projection Chamber (TPC) is the main tracking detector in ALICE. It is planned that by the year 2018, GEM detectors will replace the present readout planes of TPC. The goal of the present study is to characterize the GEM detector to achieve the performance goal of the TPC

  16. Simulation and Calibration of the ALICE TPC including innovative Space Charge Calculations

    CERN Document Server

    Rossegger, S; Riegler, W; Betev, L

    2009-01-01

    ALICE is one of the four main particle detectors located around the LHC accelerator at CERN. It is particularly designed to study the physics of the quark-gluon plasma by means of nucleus--nucleus collisions at center-of-mass energies up to 5.5 TeV per nucleon pair. A Time-Projection Chamber (TPC) was chosen to be its central-sub-detector due to its low mass properties and its capabilities to provide a robust and accurate Particle Identification even within ultra-high multiplicity environments (up to 8000 tracks per unit of eta). To achieve the required physics performance, the space point resolution of the TPC must be in the order of 0.2 mm. Due to its gigantic size of 5~m in diameter and 5~m in length, corrections for static as well as dynamic effects are indispensable in order to accomplish the design goal. The research presented covers all major issues relevant for the final calibration and therefore the enhancement of the TPC performance in terms of resolution. The main focus was to distinguish between t...

  17. Status of the ALICE TPC upgrade for high-rate operation

    Energy Technology Data Exchange (ETDEWEB)

    Gasik, Piotr [TU Muenchen, Physik Department E12, Excellence Cluster ' ' Universe' ' , D-85748, Garching (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    A large Time Projection Chamber (TPC) is the main device for tracking and charged particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2018/2019, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 100 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivity of rare probes that are considered key observables to characterise the hot and dense QCD matter created in such collisions. In order to make full use of this luminosity, a major upgrade of the TPC is required. It is foreseen to replace the existing MWPC-based readout chambers by Gas Electron Multiplier (GEM) detectors to overcome the rate limitations imposed by the present gated readout scheme. An extensive R and D program has been launched to reach the challenging requirements of the upcoming upgrade of the detector. In this presentation the most recent results are discussed concerning ion backflow suppression, gain stability, energy and dE/dx resolution and stability against discharges. The status of the upgrade of the online calibration and data reduction system, which includes advanced techniques for online corrections of space-charge distortions, as well as the development of a new readout electronics are reported.

  18. arXiv GEM Foil Quality Assurance For The ALICE TPC Upgrade

    CERN Document Server

    INSPIRE-00019412; Hildén, Timo

    2018-01-01

    The ALICE (A Large Ion Collider Experiment) experiment at the Large Hadron Collider (LHC) at CERN is dedicated to heavy ion physics to explore the structure of strongly interacting matter. The Time Projection Chamber (TPC) of ALICE is a tracking detector located in the central region of the experiment. It offers excellent tracking capabilities as well as particle identification. After the second long shutdown (LS2) the LHC will run at substantially higher luminosities. To be able to increase the data acquisition rate by a factor of 100, the ALICE TPC experiment has to replace the Multi-Wire Proportional Chamber (MWPC) –based readout chambers. The MWPC are operated with gating grid that limits the rate to O(kHz). The new ReadOut Chamber (ROC) design is based on Gas Electron Multiplier (GEM) technology operating in continuous mode. The current GEM productions scheme foresees the production of more than 800 GEM foils of different types. To fulfill the requirements on the performance of the GEM TPC readout, nec...

  19. Lossy compression of TPC data and trajectory tracking efficiency for the ALICE experiment

    CERN Document Server

    Nicolaucig, A; Mattavelli, M

    2003-01-01

    In this paper a quasi-lossless algorithm for the on-line compression of the data generated by the Time Projection Chamber (TPC) detector of the ALICE experiment at CERN is described. The algorithm is based on a lossy source code modeling technique, i.e. it is based on a source model which is lossy if samples of the TPC signal are considered one by one; conversely, the source model is lossless or quasi-lossless if some physical quantities that are of main interest for the experiment are considered. These quantities are the area and the location of the center of mass of each TPC signal pulse, representing the pulse charge and the time localization of the pulse. So as to evaluate the consequences of the error introduced by the lossy compression process, the results of the trajectory tracking algorithms that process data off-line after the experiment are analyzed, in particular, versus their sensibility to the noise introduced by the compression. Two different versions of these off- line algorithms are described,...

  20. Investigations of the long-term stability of a GEM-TPC

    Energy Technology Data Exchange (ETDEWEB)

    Fedorchuk, Oleksiy [Deutsches Elektronen-Synchrotron (DESY), Notkestrasse 85, 22607 Hamburg (Germany); Universitaet Hamburg, Institut fuer Experimentalphysik, Luruper Chaussee 149, 22761 Hamburg (Germany); Collaboration: LCTPC-Deutschland-Collaboration

    2016-07-01

    For the International Large Detector (ILD) at the planned International Linear Collider (ILC) a Time Projection Chamber (TPC) is foreseen as the main tracking detector. The gas amplification will be done by Micro Pattern Gaseous Detectors (MPGD). One option is to use Gas Electron Multipliers (GEM).While the applicability of GEMs for the gas amplification in a TPC readout has been shown, the focus of the current research is to improve the high voltage stability and reliability of the readout modules. This is a crucial requirement for the operation in the final ILD TPC. The main focus of the research presented in this talk is on studies of the discharge stability and operational features of large area 22 x 18 cm{sup 2} GEM foils. We present systematic studies of the stability of GEM foils under different operation conditions. These studies include measurements and calculations of the dynamic behavior of charges in the GEM foils after a trip. The results will be used to develop methods to avoid destructive discharges in the final readout module.

  1. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  2. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  3. Cost Assessment Methodology and Economic Viability of Tidal Energy Projects

    Directory of Open Access Journals (Sweden)

    Eva Segura

    2017-11-01

    Full Text Available The exploitation of technologies with which to harness the energy from ocean currents will have considerable possibilities in the future thanks to their enormous potential for electricity production and their high predictability. In this respect, the development of methodologies for the economic viability of these technologies is fundamental to the attainment of a consistent quantification of their costs and the discovery of their economic viability, while simultaneously attracting investment in these technologies. This paper presents a methodology with which to determine the economic viability of tidal energy projects, which includes a technical study of the life-cycle costs into which the development of a tidal farm can be decomposed: concept and definition, design and development, manufacturing, installation, operation and maintenance and dismantling. These cost structures are additionally subdivided by considering their sub-costs and bearing in mind the main components of the tidal farm: the nacelle, the supporting tidal energy converter structure and the export power system. Furthermore, a technical study is developed in order to obtain an estimation of the annual energy produced (and, consequently, the incomes generated if the electric tariff is known by considering its principal attributes: the characteristics of the current, the ability of the device to capture energy and its ability to convert and export the energy. The methodology has been applied (together with a sensibility analysis to the particular case of a farm composed of first generation tidal energy converters in one of the Channel Island Races, the Alderney Race, in the U.K., and the results have been attained by means of the computation of engineering indexes, such as the net present value, the internal rate of return, the discounted payback period and the levelized cost of energy, which indicate that the proposed project is economically viable for all the case studies.

  4. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  5. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  6. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  7. Building a large-area GEM-based readout chamber for the upgrade of the ALICE TPC

    CERN Document Server

    Gasik, Piotr

    2017-01-01

    A large Time Projection Chamber (TPC) is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019-2020, the LHC will deliver Pb beams colliding at an interaction rate up to 50 kHz, which is about a factor of 100 above the present read-out rate of the TPC. To fully exploit the LHC potential the TPC will be upgraded based on the Gas Electron Multiplier (GEM) technology. A prototype of an ALICE TPC Outer Read-Out Chamber (OROC) was equipped with twelve large-size GEM foils as amplification stage to demonstrate the feasibility of replacing the current Multi Wire Proportional Chambers with the new technology. With a total area of $\\sim$0.76 m$^2$ it is the largest GEM-based detector built to date. The GEM OROC was installed within a test field cage and commissioned with radioactive sources.

  8. Building a large-area GEM-based readout chamber for the upgrade of the ALICE TPC

    Energy Technology Data Exchange (ETDEWEB)

    Gasik, P. [Physik Department E62, Technische Universität München, Garching (Germany); Excellence Cluster ‘Origin and Structure of the Universe’, Garching (Germany)

    2017-02-11

    A large Time Projection Chamber (TPC) is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019–2020, the LHC will deliver Pb beams colliding at an interaction rate up to 50 kHz, which is about a factor of 100 above the present read-out rate of the TPC. To fully exploit the LHC potential the TPC will be upgraded based on the Gas Electron Multiplier (GEM) technology. A prototype of an ALICE TPC Outer Read-Out Chamber (OROC) was equipped with twelve large-size GEM foils as amplification stage to demonstrate the feasibility of replacing the current Multi Wire Proportional Chambers with the new technology. With a total area of ∼0.76 m{sup 2} it is the largest GEM-based detector built to date. The GEM OROC was installed within a test field cage and commissioned with radioactive sources.

  9. Building a large-area GEM-based readout chamber for the upgrade of the ALICE TPC

    International Nuclear Information System (INIS)

    Gasik, P.

    2017-01-01

    A large Time Projection Chamber (TPC) is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019–2020, the LHC will deliver Pb beams colliding at an interaction rate up to 50 kHz, which is about a factor of 100 above the present read-out rate of the TPC. To fully exploit the LHC potential the TPC will be upgraded based on the Gas Electron Multiplier (GEM) technology. A prototype of an ALICE TPC Outer Read-Out Chamber (OROC) was equipped with twelve large-size GEM foils as amplification stage to demonstrate the feasibility of replacing the current Multi Wire Proportional Chambers with the new technology. With a total area of ∼0.76 m 2 it is the largest GEM-based detector built to date. The GEM OROC was installed within a test field cage and commissioned with radioactive sources.

  10. Dedicated supernova detection by a network of neutral current spherical TPC detectors

    International Nuclear Information System (INIS)

    Vergados, J. D.; Giomataris, Y.

    2007-01-01

    Supernova neutrinos can easily be detected by a spherical gaseous TPC detector measuring very low energy nuclear recoils. The expected rates are quite large for a neutron-rich target since the neutrino-nucleus neutral current interaction yields a coherent contribution of all neutrons. As a matter of fact, for a typical supernova at 10 kpc, about 1000 events are expected using a spherical detector of radius 4 m with Xe gas at a pressure of 10 atm. A worldwide network of several such simple, stable, and low-cost supernova detectors with a running time of a few centuries is quite feasible

  11. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  12. Silicon ion interactions measured in the E-810 TPC at the AGS

    International Nuclear Information System (INIS)

    Love, W.A.; Eiseman, S.E.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Kruk, J.W.; Mutchler, G.S.; Nessi, M.; Nessi-Tedaldi, F.; Roberts, J.B.; Chan, C.S.; Kramer, M.A.; Zhao, K.; Hallman, T.J.; Madansky, L.; Lindenbaum, S.J.

    1991-01-01

    The tracking detector of AGS Experiment 810 is a three-piece Time Projection Chamber (TPC) which measures all charged tracks in the forward hemisphere of the nucleon-nucleon center of mass system, i.e. forward of 20 degrees in the lab. A cut at multiplicity 50 was used to select more central collisions, yielding 2291 events from the gold sample, 2170 from the copper. This corresponds to cross sections of 0.59 and 0.20 barns, respectively, defining the 'central' sample for the charged particle distributions presented here. (orig./HSI)

  13. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  14. Quality of Security Service Costing Demonstration for the MSHN Project

    National Research Council Canada - National Science Library

    Spyropoulou, Evdoxia

    2000-01-01

    .... Each service has two costs: an initialization cost and a run-time cost. The demonstration illustrates the costs incurred as network modes and security levels are changed. High level and detailed specifications are provided.

  15. Experimental observation of an extremely high electron lifetime with the ICARUS-T600 LAr-TPC

    CERN Document Server

    Antonello, M; Benetti, P; Boffelli, F; Bubak, A; Calligarich, E; Centro, S; Cesana, A; Cieslik, K; Cline, D B; Cocco, A G; Dabrowska, A; Dermenev, A; Dolfini, R; Falcone, A; Farnese, C; Fava, A; Ferrari, A; Fiorillo, G; Gibin, D; Gninenko, S; Guglielmi, A; Haranczyk, M; Holeczek, J; Kirsanov, M; Kisiel, J; Kochanek, I; Lagoda, J; Mania, S; Menegolli, A; Meng, G; Montanari, C; Otwinowski, S; Picchi, P; Pietropaolo, F; Plonski, P; Rappoldi, A; Raselli, G L; Rossella, M; Rubbia, C; Sala, P; Scaramelli, A; Segreto, E; Sergiampietri, F; Stefan, D; Sulej, R; Szarska, M; Terrani, M; Torti, M; Varanini, F; Ventura, S; Vignoli, C; Wang, H; Yang, X; Zalewska, A; Zani, A; Zaremba, K

    2014-01-01

    The ICARUS T600 detector, the largest liquid Argon Time Projection Chamber (LAr-TPC) realized after many years of RD activities, was installed and successfully operated for 3 years at the INFN Gran Sasso underground Laboratory. One of the most important issues was the need of an extremely low residual electronegative impurity content in the liquid Argon, in order to transport the free electrons created by the ionizing particles with a very small attenuation along the drift path. The solutions adopted for the Argon re-circulation and purification systems have permitted to reach impressive results in terms of Argon purity and a free electron lifetime exceeding 15 ms, corresponding to about 20 parts per trillion of equivalent O2 contamination, a milestone for any future project involving LAr-TPC's and the development of higher detector mass scales.

  16. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  17. pesticide residues in water from tpc sugarcane plantations

    African Journals Online (AJOL)

    ABSTRACT. We report herein, the analysis of water samples collected from TPC Sugarcane Plantation and its environs in Kilimanjaro region, which is the earliest intensive user of pesticides in Tanzania. A total of 50 water samples collected from 18 sampling sites between 2000 and 2001 were analyzed for pesticide ...

  18. Measurements of electron drift and diffusion properties in a large cylindrical drift chamber (TPC) with parallel electric and magnetic fields

    International Nuclear Information System (INIS)

    Richstein, J.

    1986-01-01

    This work describes measurements on the drift of electrons in gases, using the TPC90, the prototype of the ALEPH Time Projection Chamber. Tracks which were created by UV-Laser ionization have been drifted over distances of up to 1.3 m in parallel electric and magnetic fields. Electron drift properties have been systematically measured as a function of these, in several gas mixtures. (orig./HSI)

  19. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  20. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  1. Live event reconstruction in an optically read out GEM-based TPC

    Science.gov (United States)

    Brunbauer, F. M.; Galgóczi, G.; Gonzalez Diaz, D.; Oliveri, E.; Resnati, F.; Ropelewski, L.; Streli, C.; Thuiner, P.; van Stenis, M.

    2018-04-01

    Combining strong signal amplification made possible by Gaseous Electron Multipliers (GEMs) with the high spatial resolution provided by optical readout, highly performing radiation detectors can be realized. An optically read out GEM-based Time Projection Chamber (TPC) is presented. The device permits 3D track reconstruction by combining the 2D projections obtained with a CCD camera with timing information from a photomultiplier tube. Owing to the intuitive 2D representation of the tracks in the images and to automated control, data acquisition and event reconstruction algorithms, the optically read out TPC permits live display of reconstructed tracks in three dimensions. An Ar/CF4 (80/20%) gas mixture was used to maximize scintillation yield in the visible wavelength region matching the quantum efficiency of the camera. The device is integrated in a UHV-grade vessel allowing for precise control of the gas composition and purity. Long term studies in sealed mode operation revealed a minor decrease in the scintillation light intensity.

  2. GEM detector performance with innovative micro-TPC readout in high magnetic field

    Directory of Open Access Journals (Sweden)

    Garzia I.

    2018-01-01

    Full Text Available Gas detector development is one of the pillars of the research in fundamental physics. Since several years, a new concept of detectors, called Micro Pattern Gas Detector (MPGD, allowed to overcome several problems related to other types of commonly used detectors, like drift chamber and micro strips detectors, reducing the rate of discharges and providing better radiation tolerance. Among the most used MPGDs are the Gas Electron Multipliers (GEMs. Invented by Sauli in 1997, nowadays GEMs have become an important reality for particle detectors in high energy physics. Commonly deployed as fast timing detectors and triggers, their fast response, high rate capability and high radiation hardness make them also suitable as tracking detectors. The readout scheme is one of the most important features in tracking technology. Analog readout based on the calculation of the center of gravity technique allows to overcome the limit imposed by digital pads, whose spatial resolution is limited by the pitch dimensions. However, the presence of high external magnetic fields can distort the electronic cloud and affect the performance. The development of the micro-TPC reconstruction method brings GEM detectors into a new prospective, improving significantly the spatial resolutionin presence of high magnetic fields. This innovative technique allows to reconstruct the 3-dimensional particle position, as Time Projection Chamber, but within a drift gap of a few millimeters. In these report, the charge centroid and micro-TPC methods are described in details. We discuss the results of several test beams performed with planar chambers in magnetic field. These results are one of the first developments of micro-TPC technique for GEM detectors, which allows to reach unprecedented performance in a high magnetic field of 1 T.

  3. GEM detector performance with innovative micro-TPC readout in high magnetic field

    Science.gov (United States)

    Garzia, I.; Alexeev, M.; Amoroso, A.; Baldini Ferroli, R.; Bertani, M.; Bettoni, D.; Bianchi, F.; Calcaterra, A.; Canale, N.; Capodiferro, M.; Cassariti, V.; Cerioni, S.; Chai, J. Y.; Chiozzi, S.; Cibinetto, G.; Cossio, F.; Cotta Ramusino, A.; De Mori, F.; Destefanis, M.; Dong, J.; Evangelisti, F.; Evangelisti, F.; Farinelli, R.; Fava, L.; Felici, G.; Fioravanti, E.; Gatta, M.; Greco, M.; Lavezzi, L.; Leng, C. Y.; Li, H.; Maggiora, M.; Malaguti, R.; Marcello, S.; Melchiorri, M.; Mezzadri, G.; Mignone, M.; Morello, G.; Pacetti, S.; Patteri, P.; Pellegrino, J.; Pelosi, A.; Rivetti, A.; Rolo, M. D.; Savrié, M.; Scodeggio, M.; Soldani, E.; Sosio, S.; Spataro, S.; Tskhadadze, E.; Verma, S.; Wheadon, R.; Yan, L.

    2018-01-01

    Gas detector development is one of the pillars of the research in fundamental physics. Since several years, a new concept of detectors, called Micro Pattern Gas Detector (MPGD), allowed to overcome several problems related to other types of commonly used detectors, like drift chamber and micro strips detectors, reducing the rate of discharges and providing better radiation tolerance. Among the most used MPGDs are the Gas Electron Multipliers (GEMs). Invented by Sauli in 1997, nowadays GEMs have become an important reality for particle detectors in high energy physics. Commonly deployed as fast timing detectors and triggers, their fast response, high rate capability and high radiation hardness make them also suitable as tracking detectors. The readout scheme is one of the most important features in tracking technology. Analog readout based on the calculation of the center of gravity technique allows to overcome the limit imposed by digital pads, whose spatial resolution is limited by the pitch dimensions. However, the presence of high external magnetic fields can distort the electronic cloud and affect the performance. The development of the micro-TPC reconstruction method brings GEM detectors into a new prospective, improving significantly the spatial resolutionin presence of high magnetic fields. This innovative technique allows to reconstruct the 3-dimensional particle position, as Time Projection Chamber, but within a drift gap of a few millimeters. In these report, the charge centroid and micro-TPC methods are described in details. We discuss the results of several test beams performed with planar chambers in magnetic field. These results are one of the first developments of micro-TPC technique for GEM detectors, which allows to reach unprecedented performance in a high magnetic field of 1 T.

  4. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  5. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  6. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  7. Performance of 20:1 multiplexer for large area charge readouts in directional dark matter TPC detectors

    Science.gov (United States)

    Ezeribe, A. C.; Robinson, M.; Robinson, N.; Scarff, A.; Spooner, N. J. C.; Yuriev, L.

    2018-02-01

    More target mass is required in current TPC based directional dark matter detectors for improved detector sensitivity. This can be achieved by scaling up the detector volumes, but this results in the need for more analogue signal channels. A possible solution to reducing the overall cost of the charge readout electronics is to multiplex the signal readout channels. Here, we present a multiplexer system in expanded mode based on LMH6574 chips produced by Texas Instruments, originally designed for video processing. The setup has a capability of reducing the number of readouts in such TPC detectors by a factor of 20. Results indicate that the important charge distribution asymmetry along an ionization track is retained after multiplexed signals are demultiplexed.

  8. Contracting and project strategy to reduce the costs

    International Nuclear Information System (INIS)

    Moum, I.O.; Mosbergvik, O.A.

    1995-01-01

    The Norwegian oil industry has developed and grown to a significant size from the 1970's through the 80's, and numerous large fields were developed under a business environment with high oil prices. The technological challenges were significant, but the expectation of high volumes of produced oil and increasing oil prices, secured the funding for development of these large fields. Today this situation is dramatically changed, and the low oil price alone would make it uneconomic to develop the new fields. In addition to low oil prices, people are now also facing smaller reservoirs, deeper water and more sever environmental conditions. The general competitiveness of the Norwegian Continental Shelf is challenged. Many initiatives have been launched in Norway to support the necessary improvements in business performance. The Norwegian oil and gas industry together with the authorities have through 1994 worked together in the NORSOK initiative to identify means to save 40--50% in cost and time for development of new fields. The industry has developed new technology. The authorities have been addressing the fiscal conditions and general framework for the oil companies, and several areas of improvement have been identified and to some degree implemented by the operators. The most important improvements are probably those that are directly implemented in actual development projects, and Statoil/Kvaerner have together some joint experiences that can illustrate how such ideas successfully can be implemented

  9. Status of the R&D activities for the upgrade of the ALICE TPC

    Science.gov (United States)

    Deisting, Alexander

    2018-02-01

    After the Long Shutdown 2 (LS2) the LHC will provide lead-lead collisions at interaction rates as high as 50 kHz. In order to cope with such conditions the ALICE Time Projection Chamber (TPC) needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and dE/dx resolution compared to the performance of the present TPC. Since readout by multi-wire proportional chambers is no longer feasible with these requirements, new technologies have to be employed. In the new readout chambers the electron amplification is provided by a stack of four Gas ElectronMultiplier (GEM) foils. Here foils with a standard hole pitch of 140 μm as well as large pitch foils (280 μm) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of σE/E ≤ 12% at the photopeak of 55Fe. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation at the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEMstack the discharge probability is kept at the level of 10-12 discharges per incoming hadron. An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the dE/dx performance of a full size readout chamber prototype was tested. In addition it is reported on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.

  10. Investigation of a Huffman-based compression algorithm for the ALICE TPC read-out in LHC Run 3

    Energy Technology Data Exchange (ETDEWEB)

    Klewin, Sebastian [Physikalisches Institut, University of Heidelberg (Germany); Collaboration: ALICE-Collaboration

    2016-07-01

    Within the scope of the ALICE upgrade towards the Run 3 of the Large Hadron Collider at CERN, starting in 2020, the ALICE Time Projection Chamber (TPC) will be reworked in order to allow for a continuous read-out. This rework includes not only a replacement of the current read-out chambers with Gas Electron Multiplier (GEM) technology, but also new front-end electronics. To be able to read out the whole data stream without loosing information, in particular without zero-suppression, a lossless compression algorithm, the Huffman encoding, was investigated and adapted to the needs of the TPC. In this talk, an algorithm, adapted for an FPGA implementation, is presented. We show its capability to reduce the data volume to less than 40% of its original size.

  11. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  12. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  13. ALICE Time Projection Chamber

    CERN Multimedia

    Lippmann, C

    2013-01-01

    The Time Projection Chamber (TPC) is the main device in the ALICE 'central barrel' for the tracking and identification (PID) of charged particles. It has to cope with unprecedented densities of charges particles.

  14. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  15. Alternate bidding strategies for asphalt and concrete pavement projects utilizing life cycle cost analysis (LCCA).

    Science.gov (United States)

    2012-07-01

    Recent changes in pavement materials costs have impacted the competitive environment relative to the : determination of the most cost effective pavement structure for a specific highway project. In response, State : highway agencies have renewed thei...

  16. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  17. Methods and results for calibration and track separation of a GEM based TPC using an UV-laser

    International Nuclear Information System (INIS)

    Ball, Markus

    2008-12-01

    In the last 30 years high energy physics could write an impressive story of success. Since the introduction of the Standard Model (SM), it has met every experimental test. However the final confirmation has to prove the mechanism of electroweak symmetry breaking, which could not be confirmed yet. The most favored theory, which includes the introduction of a Higgs field, could not be verified experimentally. Furthermore there is clear evidence, that the SM is only a low energy description of nature and its principles, as the SM describes only 4 % of the known matter in the universe. There are two different approaches in accelerator driven high energy physics to clarify the open questions. The Large Hadron Collider (LHC) have a good opportunity to measure some of the missing pieces with its high center of mass energy. The International Linear Collider (ILC) will then measure their parameters with high precision. To guarantee this high precision the detectors have to be able to identify every single particle and determine its properties with high accuracy. These high requirements to the single detectors as well as the interconnectivity between all detectors are summarised by the concept of particle flow (PFLOW). This means that all particles must be separable, which includes in particular the main tracking device. A possible candidate for the central tracking device is a Time Projection Chamber (TPC). In this work a TPC with Gas Electron Multipliers (GEM) as gas amplification system was used. The GEMs replace the conventional wire amplification system of the TPC. In this PhD work a method to determine the drift velocity of a TPC was developed and tested using an ultraviolet laser. To ensure a high accuracy of the method all relevant gas parameters were measured with a slow control system. Furthermore the laser was used to investigate the separation capability of nearby tracks. Therefore an existing TPC prototype, which was developed to operate in a 5 T magnet facility

  18. Fast TPC Online Tracking on GPUs and Asynchronous Data Processing in the ALICE HLT to facilitate Online Calibration

    International Nuclear Information System (INIS)

    Rohr, David; Gorbunov, Sergey; Krzewicki, Mikolaj; Breitner, Timo; Kretz, Matthias; Lindenstruth, Volker

    2015-01-01

    ALICE (A Large Heavy Ion Experiment) is one of the four major experiments at the Large Hadron Collider (LHC) at CERN, which is today the most powerful particle accelerator worldwide. The High Level Trigger (HLT) is an online compute farm of about 200 nodes, which reconstructs events measured by the ALICE detector in real-time. The HLT uses a custom online data-transport framework to distribute data and workload among the compute nodes.ALICE employs several calibration-sensitive subdetectors, e.g. the TPC (Time Projection Chamber). For a precise reconstruction, the HLT has to perform the calibration online. Online- calibration can make certain Offline calibration steps obsolete and can thus speed up Offline analysis. Looking forward to ALICE Run III starting in 2020, online calibration becomes a necessity.The main detector used for track reconstruction is the TPC. Reconstructing the trajectories in the TPC is the most compute-intense step during event reconstruction. Therefore, a fast tracking implementation is of great importance. Reconstructed TPC tracks build the basis for the calibration making a fast online-tracking mandatory.We present several components developed for the ALICE High Level Trigger to perform fast event reconstruction and to provide features required for online calibration.As first topic, we present our TPC tracker, which employs GPUs to speed up the processing, and which bases on a Cellular Automaton and on the Kalman filter. Our TPC tracking algorithm has been successfully used in 2011 and 2012 in the lead-lead and the proton-lead runs. We have improved it to leverage features of newer GPUs and we have ported it to support OpenCL, CUDA, and CPUs with a single common source code. This makes us vendor independent.As second topic, we present framework extensions required for online calibration. The extensions, however, are generic and can be used for other purposes as well. We have extended the framework to support asynchronous compute chains

  19. Methods and results for calibration and track separation of a GEM based TPC using an UV-laser

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Markus

    2008-12-15

    In the last 30 years high energy physics could write an impressive story of success. Since the introduction of the Standard Model (SM), it has met every experimental test. However the final confirmation has to prove the mechanism of electroweak symmetry breaking, which could not be confirmed yet. The most favored theory, which includes the introduction of a Higgs field, could not be verified experimentally. Furthermore there is clear evidence, that the SM is only a low energy description of nature and its principles, as the SM describes only 4 % of the known matter in the universe. There are two different approaches in accelerator driven high energy physics to clarify the open questions. The Large Hadron Collider (LHC) have a good opportunity to measure some of the missing pieces with its high center of mass energy. The International Linear Collider (ILC) will then measure their parameters with high precision. To guarantee this high precision the detectors have to be able to identify every single particle and determine its properties with high accuracy. These high requirements to the single detectors as well as the interconnectivity between all detectors are summarised by the concept of particle flow (PFLOW). This means that all particles must be separable, which includes in particular the main tracking device. A possible candidate for the central tracking device is a Time Projection Chamber (TPC). In this work a TPC with Gas Electron Multipliers (GEM) as gas amplification system was used. The GEMs replace the conventional wire amplification system of the TPC. In this PhD work a method to determine the drift velocity of a TPC was developed and tested using an ultraviolet laser. To ensure a high accuracy of the method all relevant gas parameters were measured with a slow control system. Furthermore the laser was used to investigate the separation capability of nearby tracks. Therefore an existing TPC prototype, which was developed to operate in a 5 T magnet facility

  20. Development of a GEM-based high rate TPC

    Energy Technology Data Exchange (ETDEWEB)

    Neubert, Sebastian; Hoeppner, Christian; Ketzer, Bernhard; Weitzel, Quirin; Paul, Stefan; Woerner, Lisa; Konorov, Igor; Mann, Alexander [Technische Universitaet Muenchen, Physik Department E18, Garching (Germany)

    2008-07-01

    A TPC is considered as the central tracker of the PANDA experiment, which is currently being planned at the new accelerator complex FAIR at Darmstadt. PANDA is designed as an internal target experiment at the antiproton storage ring HESR. The central tracker has to measure particle trajectories over a wide momentum range (0.1-8 GeV/c) from up to 2.10{sup 7} antiproton-proton annihilations/s. The continuous nature of the antiproton beam makes the use of a traditional ion gate impractical. Owing to their intrinsic ion suppression properties, GEM foils are planned as the amplification stage. A small prototype of this GEM-TPC (diameter 200 mm, drift length 77 mm) has been built and characterized with cosmic muons. Results such as spatial resolution, cluster distributions, and diffusion properties are presented in this talk.

  1. Development of a GEM-based TPC for PANDA

    Energy Technology Data Exchange (ETDEWEB)

    Hoeppner, Christian; Ketzer, Bernhard; Konorov, Igor; Mann, Alexander; Neubert, Sebastian; Paul, Stephan; Weitzel, Quirin; Woerner, Lisa [Technische Universitaet Muenchen, Physik Department E18, 85748 Garching (Germany)

    2008-07-01

    A TPC is considered as the central tracker of the PANDA experiment, which is currently being planned at the new accelerator complex FAIR at Darmstadt. PANDA is designed as an internal target experiment at the antiproton storage ring HESR. The central tracker has to measure particle trajectories over a wide momentum range (0.1-8 GeV/c) from up to 2.10{sup 7} antiproton-proton annihilations/s. The continuous nature of the antiproton beam makes the use of a traditional ion gate impractical. Owing to their intrinsic ion suppression properties, GEM foils are planned as the amplification stage. A small prototype of this GEM-TPC (diameter 200 mm, drift length 77 mm) has been built and characterized with cosmic muons. Results such as spatial resolution, cluster distributions, and diffusion properties are presented in this talk.

  2. The ICARUS 50 1 LAr TPC in the CERN $\

    CERN Document Server

    Arneodo, F.; De Mitri, I.; Mazza, D.; Parlati, S.; Petrera, S.; Piano Mortari, Giovanni; Verdecchia, M.; Benetti, P.; Borio Di Tigliole, A.; Calligarich, E.; Cesana, E.; Dolfini, R.; Mauri, F.; Montanari, C.; Rappoldi, A.; Raselli, G.L.; Terrani, M.; Torre, P.; Vignoli, C.; Bettini, A.; Carpanese, C.; Centro, S.; Pepato, A.; Pietropaolo, F.; Ventura, S.; Bonesini, M.; Boschetti, B.; Calvi, M.; Curioni, A.; Cavalli, D.; Ferrari, A.; Ferrari, P.; Negri, P.; Paganoni, M.; Pullia, A.; Sala, P.; Ragazzi, S.; Redaelli, Nicola Giuseppe; Tabarelli De Fatis, T.; Terranova, F.; Tonazzo, A.; Casagrande, F.; Cennini, P.; Puccini, A.; Rubbia, A.; Rubbia, C.; Revol, J.P.; Cline, D.; Matthey, C.; Otwinowski, S.; Park, J.; Wang, H.; Woo, J.; Givoletti, J.; Lamarina, A.; Periale, R.; Picchi, P.; Mannocchi, G.; Periale, L.; Suzuki, S.; Sergiampietri, F.

    1999-01-01

    The 50 litre liquid Argon TPC is a detector built and successfully operated at CERN for R&D purposes within the ICARUS programme. In the year 1997 it has been exposed at the CERN neutrino beam for the entire SPS neutrino run period as proposed and approved at the SPSLC of January 1997. The detector, complemented with scintillators acting as veto, trigger counters and pre-shower counters, was installed in front of the NOMAD detector. The year 1997 was scheduled to be the last for the operation of the West Area Neutrino Facility. It was important to take this last opportunity for a parasitic exposure, which did not interfere with running experiments, of an already existing and operating liquid Argon TPC. As we had expected, the collected data brought important information for a better understanding of the performance of liquid Argon TPCs which should be useful for the entire ICARUS program. (9 refs).

  3. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  4. Fast algorithm of track reconstruction for the Delphy TPC

    International Nuclear Information System (INIS)

    Maillard, J.

    1984-01-01

    We describe a simple geometrical method (polar inversion) to reconstruct tracks. When the magnetic field is constant in magnitude and direction. This method uses geometrical properties of the trajectories. In the case of the DELPHI apparatus, the track reconstruction is done using TPC informations. After explaining the algorithm, we give results on ''GEANT'' simulated events using the ''Lund'' generator. Today we get a computer time of the order of 1.2 milliseconds on a CDC 7600 and an efficiency of 98% [fr

  5. Performance of an optical readout GEM-based TPC

    International Nuclear Information System (INIS)

    Margato, L.M.S.; Fraga, F.A.F.; Fetal, S.T.G.; Fraga, M.M.F.R.; Balau, E.F.S.; Blanco, A.; Marques, R. Ferreira; Policarpo, A.J.P.L

    2004-01-01

    We report on the operation of a GEM-based small TPC using an optical readout. The detector was operated with a mixture of Ar+CF 4 using 5.48 MeV alpha particles obtained from a 241 Am source and the GEM scintillation was concurrently read by a CCD camera and a photomultiplier. Precision collimators were used to define the track orientation. Qualitative results on the accuracy of the track angle, length and charge deposition measurements are presented

  6. A TPC-like readout method for high precision muon-tracking using GEM-detectors

    Energy Technology Data Exchange (ETDEWEB)

    Flierl, Bernhard; Biebel, Otmar; Bortfeldt, Jonathan; Hertenberger, Ralf; Klitzner, Felix; Loesel, Philipp; Mueller, Ralph [Ludwig-Maximilians-Universitaet Muenchen (Germany); Zibell, Andre [Julius-Maximilians-Universitaet Wuerzburg (Germany)

    2016-07-01

    Gaseous electron multiplier (GEM) detectors are well suited for tracking of charged particles. Three dimensional tracking in a single layer can be achieved by application of a time-projection-chamber like readout mode (μTPC), if the drift time of the electrons is measured and the position dependence of the arrival time is used to calculate the inclination angle of the track. To optimize the tracking capabilities for ion tracks drift gas mixtures with low drift velocity have been investigated by measuring tracks of cosmic muons in a compact setup of four GEM-detectors of 100 x 100 x 6 mm{sup 3} active volume each and an angular acceptance of -25 to 25 . The setup consists of three detectors with two-dimensional strip readout layers of 0.4 mm pitch and one detector with a single strip readout layer of 0.25 mm pitch. All strips are readout by APV25 frontend boards and the amplification stage in the detectors consists of three GEM-foils. Tracks are reconstructed by the μTPC-method in one of the detectors and are then compared to the prediction from the other three detectors defined by the center of charge in every detector. We report our study of Argon and Helium based noble gas mixtures with carbon-dioxide as quencher.

  7. R and D on a Fast LXe TPC with real-time event reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Dussoni, S., E-mail: simeone.dussoni@pi.infn.it [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Baldini, A. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Galli, L. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Paul Scherrer Institute PSI, CH-5232 Villigen (Switzerland); Cerri, C.; Grassi, M. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Papa, A. [Paul Scherrer Institute PSI, CH-5232 Villigen (Switzerland); Signorelli, G. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy)

    2013-12-21

    The FOXFIRE project (Feasibility Of a Xenon detector with Front-end for Ionization Real-time Extraction) aims at the realization of a Liquid Xenon TPC optimized for high rate particle physics experiments, in particular in the field of rare event searches, with particles in the 10–100 MeV energy range. Liquid Xenon has several attractive properties to be exploited resulting in superior time and energy resolution, by using the scintillation light readout with suitable photo-detectors. A novel approach with a complementary TPC readout scheme can improve the space resolution to a level of a few hundred microns. We are studying both the feasibility of a light readout with higher granularity by means of Silicon PhotoMultipliers optimized for the Xenon emission spectrum as well as on an innovative micro-fabricated device capable of charge multiplication in liquid phase. The detector will be equipped with a readout electronics capable of online reconstruction of events, allowing the detector to sustain a high rate of interactions.

  8. Space charge calibration of the ALICE TPC operated with an open gating grid

    Energy Technology Data Exchange (ETDEWEB)

    Hellbaer, Ernst [Institut fuer Kernphysik, Goethe-Universitaet Frankfurt (Germany); Ivanov, Marian [GSI (Germany); Wiechula, Jens [Universitaet Tuebingen (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    The Time Projection Chamber (TPC) is the main particle identification detector of the ALICE experiment at the CERN LHC. High interaction rates of 50 kHz in Pb-Pb during the Run 3 period after 2020 require a major upgrade of the TPC readout. The currently used Multiwire Proportional Chambers (MWPCs) will be replaced by readout chambers (ROCs) based on Gas Electron Multiplier (GEM) technology which will be operated in a continuous mode. While the gating grid of the MWPCs prevents the positive ions of the amplification region from entering the drift volume, the GEM-based ROCs will introduce an ion backflow (IBF) of about 1%. In combination with the high-luminosity environment, this amount of back-drifting ions results in a considerable space charge density which distorts the drift path of the primary ionisation electrons significantly. In order to still provide a high tracking efficiency and cluster-to-track association, an efficient calibration scheme will be implemented. As a test ground for the new calibration scheme, pp collision data was taken during Run 1 with the gating grid operated in a transparent mode allowing the ions to enter the drift volume. The measured space point distortions due to the space charge are presented together with the corrected data and compared to simulations for Run 3.

  9. Free electron lifetime achievements in Liquid Argon Imaging TPC

    CERN Document Server

    Baibussinov, B; Calligarich, E; Centro, S; Cieslik, K; Farnese, C; Fava, A; Gibin, D; Guglielmi, A; Meng, G; Pietropaolo, F; Rubbia, C; Varanini, F; Ventura, S

    2010-01-01

    A key feature for the success of the Liquid Argon TPC technology is the industrial purification against electro-negative impurities, especially Oxygen and Nitrogen remnants, which have to be initially and continuously kept at an exceptional purity. New purification techniques have been applied to a 120 litres LAr-TPC test facility in the INFN-LNL laboratory. Through-going muon tracks have been used to monitor the LAr purity. The short path length used (30 cm) is compensated by the high accuracy in the observation of the specific ionization of cosmic rays muons at sea level. A free electron lifetime of (21.4+7.3-4.3) ms, namely > 15.8 ms at 90 % C.L. has been observed under stable conditions over several weeks, corresponding to about 15 ppt (part per trillion) of Oxygen equivalent. At 500 V/cm, where the electron speed is approximately of 1.5 mm/us, the free electron lifetime >15 ms corresponds to an attenuation <15 % for a drift path of 5 m, opening the way to reliable operation of LAr TPC for exceptionall...

  10. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  11. LBNO-DEMO (WA105): a large demonstrator of the Liquid Argon double phase TPC

    CERN Document Server

    Trzaska, Wladyslaw Henryk

    2015-01-01

    LBNO-DEMO (WA105) is a large demonstrator of the double phase liquid argon TPC intended to develop and test the main elements of the GLACIER-based design for the purpose of scaling it up to the 10–50 kton size needed for Long Baseline Neutrino Oscillation studies. The crucial components of the design are: ultra-high argon purity in non-evacuable tank, long drifts, very high drift voltages, large area Micro Pattern Gas Detectors, and cold preamplifiers. The active volume of the demonstrator is 666 m3 (approximately 300t). WA105 is under construction at CERN and will be exposed to charged particle beams (0.5-20 GeV/c) in the North Area in 2018. The data will provide the necessary calibration of the detector performance and benchmark reconstruction algorithms. This project is a crucial milestone for the long baseline neutrino program, including projects like LBNO and DUNE.

  12. μ-TPC: a future standard instrument for low energy neutron field characterization

    International Nuclear Information System (INIS)

    Maire, D.; Lebreton, L.; Petit, M.; Billard, J.; Bourrion, O.; Bosson, G.; Guillaudin, O.; Lamblin, J.; Mayet, F.; Medard, J.; Muraz, J.F.; Richer, J.P.; Riffard, Q.; Santos, D.

    2013-06-01

    In order to measure energy of neutron fields, with energy ranging from 8 keV to 1 MeV, a new primary standard is being developed at the IRSN (Institute for Radioprotection and Nuclear Safety). This project, μ-TPC (Micro Time Projection Chamber), carried out in collaboration with the LPSC (Laboratoire de Physique Subatomique et de Cosmologie), is based on the nucleus recoil detector principle. The instrument will be presented with the associated method to measure the neutron energy. This article will emphasize the proton energy calibration procedure and energy measurements of a neutron field produced at 127 keV on the IRSN facility AMANDE. Finally the COMIMAC device, dedicated to the calibration, will be described. This original device, developed at the LPSC, is able to produce proton and electron beams with an accurate energy ranging from 1 keV to 50 keV. (authors)

  13. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  15. Project financing knits parts of costly LNG supply chain

    International Nuclear Information System (INIS)

    Minyard, R.J.; Strode, M.O.

    1997-01-01

    The supply and distribution infrastructure of an LNG project requires project sponsors and LNG buyers to make large, interdependent capital investments. For a grassroots project, substantial investments may be necessary for each link in the supply chain: field development; liquefaction plant and storage; ports and utilities; ships; receiving terminal and related facilities; and end-user facilities such as power stations or a gas distribution network. The huge sums required for these projects make their finance ability critical to implementation. Lenders have become increasingly comfortable with LNG as a business and now have achieved a better understanding of the risks associated with it. Raising debt financing for many future LNG projects, however, will present new and increasingly difficult challenges. The challenge of financing these projects will be formidable: political instability, economic uncertainty, and local currency volatility will have to be recognized and mitigated. Described here is the evolution of financing LNG projects, including the Rasgas LNG project financing which broke new ground in this area. The challenges that lie ahead for sponsors seeking to finance future projects selling LNG to emerging markets are also discussed. And the views of leading experts from the field of project finance, specifically solicited for this article, address major issues that must be resolved for successful financing of these projects

  16. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  17. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  18. Study to establish cost projections for production of Redox chemicals

    Science.gov (United States)

    Walther, J. F.; Greco, C. C.; Rusinko, R. N.; Wadsworth, A. L., III

    1982-01-01

    A cost study of four proposed manufacturing processes for redox chemicals for the NASA REDOX Energy Storage System yielded favorable selling prices in the range $0.99 to $1.91/kg of chromic chloride, anhydrous basis, including ferrous chloride. The prices corresponded to specific energy storage costs from under $9 to $17/kWh. A refined and expanded cost analysis of the most favored process yielded a price estimate corresponding to a storage cost of $11/kWh. The findings supported the potential economic viability of the NASA REDOX system.

  19. DarkSide-20k: A 20 Tonne Two-Phase LAr TPC for Direct Dark Matter Detection at LNGS

    Energy Technology Data Exchange (ETDEWEB)

    Aalseth, C.E.; et al.

    2017-07-25

    Building on the successful experience in operating the DarkSide-50 detector, the DarkSide Collaboration is going to construct DarkSide-20k, a direct WIMP search detector using a two-phase Liquid Argon Time Projection Chamber (LArTPC) with an active (fiducial) mass of 23 t (20 t). The DarkSide-20k LArTPC will be deployed within a shield/veto with a spherical Liquid Scintillator Veto (LSV) inside a cylindrical Water Cherenkov Veto (WCV). Operation of DarkSide-50 demonstrated a major reduction in the dominant $^{39}$Ar background when using argon extracted from an underground source, before applying pulse shape analysis. Data from DarkSide-50, in combination with MC simulation and analytical modeling, shows that a rejection factor for discrimination between electron and nuclear recoils of $\\gt3\\times10^9$ is achievable. This, along with the use of the veto system, is the key to unlocking the path to large LArTPC detector masses, while maintaining an "instrumental background-free" experiment, an experiment in which less than 0.1 events (other than $\

  20. DarkSide-20k: A 20 tonne two-phase LAr TPC for direct dark matter detection at LNGS

    Science.gov (United States)

    Aalseth, C. E.; Acerbi, F.; Agnes, P.; Albuquerque, I. F. M.; Alexander, T.; Alici, A.; Alton, A. K.; Antonioli, P.; Arcelli, S.; Ardito, R.; Arnquist, I. J.; Asner, D. M.; Ave, M.; Back, H. O.; Barrado Olmedo, A. I.; Batignani, G.; Bertoldo, E.; Bettarini, S.; Bisogni, M. G.; Bocci, V.; Bondar, A.; Bonfini, G.; Bonivento, W.; Bossa, M.; Bottino, B.; Boulay, M.; Bunker, R.; Bussino, S.; Buzulutskov, A.; Cadeddu, M.; Cadoni, M.; Caminata, A.; Canci, N.; Candela, A.; Cantini, C.; Caravati, M.; Cariello, M.; Carlini, M.; Carpinelli, M.; Castellani, A.; Catalanotti, S.; Cataudella, V.; Cavalcante, P.; Cavuoti, S.; Cereseto, R.; Chepurnov, A.; Cicalò, C.; Cifarelli, L.; Citterio, M.; Cocco, A. G.; Colocci, M.; Corgiolu, S.; Covone, G.; Crivelli, P.; D'Antone, I.; D'Incecco, M.; D'Urso, D.; Da Rocha Rolo, M. D.; Daniel, M.; Davini, S.; de Candia, A.; De Cecco, S.; De Deo, M.; De Filippis, G.; De Guido, G.; De Rosa, G.; Dellacasa, G.; Della Valle, M.; Demontis, P.; Derbin, A.; Devoto, A.; Di Eusanio, F.; Di Pietro, G.; Dionisi, C.; Dolgov, A.; Dormia, I.; Dussoni, S.; Empl, A.; Fernandez Diaz, M.; Ferri, A.; Filip, C.; Fiorillo, G.; Fomenko, K.; Franco, D.; Froudakis, G. E.; Gabriele, F.; Gabrieli, A.; Galbiati, C.; Garcia Abia, P.; Gendotti, A.; Ghisi, A.; Giagu, S.; Giampa, P.; Gibertoni, G.; Giganti, C.; Giorgi, M. A.; Giovanetti, G. K.; Gligan, M. L.; Gola, A.; Gorchakov, O.; Goretti, A. M.; Granato, F.; Grassi, M.; Grate, J. W.; Grigoriev, G. Y.; Gromov, M.; Guan, M.; Guerra, M. B. B.; Guerzoni, M.; Gulino, M.; Haaland, R. K.; Hallin, A.; Harrop, B.; Hoppe, E. W.; Horikawa, S.; Hosseini, B.; Hughes, D.; Humble, P.; Hungerford, E. V.; Ianni, An.; Jillings, C.; Johnson, T. N.; Keeter, K.; Kendziora, C. L.; Kim, S.; Koh, G.; Korablev, D.; Korga, G.; Kubankin, A.; Kuss, M.; Kuźniak, M.; La Commara, M.; Lehnert, B.; Li, X.; Lissia, M.; Lodi, G. U.; Loer, B.; Longo, G.; Loverre, P.; Lussana, R.; Luzzi, L.; Ma, Y.; Machado, A. A.; Machulin, I. N.; Mandarano, A.; Mapelli, L.; Marcante, M.; Margotti, A.; Mari, S. M.; Mariani, M.; Maricic, J.; Martoff, C. J.; Mascia, M.; Mayer, M.; McDonald, A. B.; Messina, A.; Meyers, P. D.; Milincic, R.; Moggi, A.; Moioli, S.; Monroe, J.; Monte, A.; Morrocchi, M.; Mount, B. J.; Mu, W.; Muratova, V. N.; Murphy, S.; Musico, P.; Nania, R.; Navrer Agasson, A.; Nikulin, I.; Nosov, V.; Nozdrina, A. O.; Nurakhov, N. N.; Oleinik, A.; Oleynikov, V.; Orsini, M.; Ortica, F.; Pagani, L.; Pallavicini, M.; Palmas, S.; Pandola, L.; Pantic, E.; Paoloni, E.; Paternoster, G.; Pavletcov, V.; Pazzona, F.; Peeters, S.; Pelczar, K.; Pellegrini, L. A.; Pelliccia, N.; Perotti, F.; Perruzza, R.; Pesudo, V.; Piemonte, C.; Pilo, F.; Pocar, A.; Pollmann, T.; Portaluppi, D.; Pugachev, D. A.; Qian, H.; Radics, B.; Raffaelli, F.; Ragusa, F.; Razeti, M.; Razeto, A.; Regazzoni, V.; Regenfus, C.; Reinhold, B.; Renshaw, A. L.; Rescigno, M.; Retière, F.; Riffard, Q.; Rivetti, A.; Rizzardini, S.; Romani, A.; Romero, L.; Rossi, B.; Rossi, N.; Rubbia, A.; Sablone, D.; Salatino, P.; Samoylov, O.; Sánchez García, E.; Sands, W.; Sanfilippo, S.; Sant, M.; Santorelli, R.; Savarese, C.; Scapparone, E.; Schlitzer, B.; Scioli, G.; Segreto, E.; Seifert, A.; Semenov, D. A.; Shchagin, A.; Shekhtman, L.; Shemyakina, E.; Sheshukov, A.; Simeone, M.; Singh, P. N.; Skensved, P.; Skorokhvatov, M. D.; Smirnov, O.; Sobrero, G.; Sokolov, A.; Sotnikov, A.; Speziale, F.; Stainforth, R.; Stanford, C.; Suffritti, G. B.; Suvorov, Y.; Tartaglia, R.; Testera, G.; Tonazzo, A.; Tosi, A.; Trinchese, P.; Unzhakov, E. V.; Vacca, A.; Vázquez-Jáuregui, E.; Verducci, M.; Viant, T.; Villa, F.; Vishneva, A.; Vogelaar, B.; Wada, M.; Wahl, J.; Walding, J.; Wang, H.; Wang, Y.; Watson, A. W.; Westerdale, S.; Williams, R.; Wojcik, M. M.; Wu, S.; Xiang, X.; Xiao, X.; Yang, C.; Ye, Z.; Yllera de Llano, A.; Zappa, F.; Zappalà, G.; Zhu, C.; Zichichi, A.; Zullo, M.; Zullo, A.; Zuzel, G.

    2018-03-01

    Building on the successful experience in operating the DarkSide-50 detector, the DarkSide Collaboration is going to construct DarkSide-20k, a direct WIMP search detector using a two-phase Liquid Argon Time Projection Chamber (LAr TPC) with an active (fiducial) mass of 23 t (20 t). This paper describes a preliminary design for the experiment, in which the DarkSide-20k LAr TPC is deployed within a shield/veto with a spherical Liquid Scintillator Veto (LSV) inside a cylindrical Water Cherenkov Veto (WCV). This preliminary design provides a baseline for the experiment to achieve its physics goals, while further development work will lead to the final optimization of the detector parameters and an eventual technical design. Operation of DarkSide-50 demonstrated a major reduction in the dominant 39Ar background when using argon extracted from an underground source, before applying pulse shape analysis. Data from DarkSide-50, in combination with MC simulation and analytical modeling, shows that a rejection factor for discrimination between electron and nuclear recoils of >3 × 109 is achievable. This, along with the use of the veto system and utilizing silicon photomultipliers in the LAr TPC, are the keys to unlocking the path to large LAr TPC detector masses, while maintaining an experiment in which less than < 0.1 events (other than ν-induced nuclear recoils) is expected to occur within the WIMP search region during the planned exposure. DarkSide-20k will have ultra-low backgrounds than can be measured in situ, giving sensitivity to WIMP-nucleon cross sections of 1.2 × 10^{-47} cm2 (1.1 × 10^{-46} cm2) for WIMPs of 1 TeV/c 2 (10 TeV/c 2) mass, to be achieved during a 5 yr run producing an exposure of 100 t yr free from any instrumental background.

  1. Overview of NREL Distribution Grid Integration Cost Projects

    Energy Technology Data Exchange (ETDEWEB)

    Horowitz, Kelsey A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ding, Fei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mather, Barry A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Denholm, Paul L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-12

    This presentation was given at the 2017 NREL Workshop 'Benchmarking Distribution Grid Integration Costs Under High Distributed PV Penetrations.' It provides a brief overview of recent and ongoing NREL work on distribution system grid integration costs, as well as challenges and needs from the community.

  2. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  3. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  4. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  5. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  6. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  7. Online Calibration of the TPC Drift Time in the ALICE High Level Trigger

    Science.gov (United States)

    Rohr, David; Krzewicki, Mikolaj; Zampolli, Chiara; Wiechula, Jens; Gorbunov, Sergey; Chauvin, Alex; Vorobyev, Ivan; Weber, Steffen; Schweda, Kai; Lindenstruth, Volker

    2017-06-01

    A Large Ion Collider Experiment (ALICE) is one of the four major experiments at the Large Hadron Collider (LHC) at CERN. The high level trigger (HLT) is a compute cluster, which reconstructs collisions as recorded by the ALICE detector in real-time. It employs a custom online data-transport framework to distribute data and workload among the compute nodes. ALICE employs subdetectors that are sensitive to environmental conditions such as pressure and temperature, e.g., the time projection chamber (TPC). A precise reconstruction of particle trajectories requires calibration of these detectors. Performing calibration in real time in the HLT improves the online reconstructions and renders certain offline calibration steps obsolete speeding up offline physics analysis. For LHC Run 3, starting in 2020 when data reduction will rely on reconstructed data, online calibration becomes a necessity. Reconstructed particle trajectories build the basis for the calibration making a fast online-tracking mandatory. The main detectors used for this purpose are the TPC and Inner Tracking System. Reconstructing the trajectories in the TPC is the most compute-intense step. We present several improvements to the ALICE HLT developed to facilitate online calibration. The main new development for online calibration is a wrapper that can run ALICE offline analysis and calibration tasks inside the HLT. In addition, we have added asynchronous processing capabilities to support long-running calibration tasks in the HLT framework, which runs event-synchronously otherwise. In order to improve the resiliency, an isolated process performs the asynchronous operations such that even a fatal error does not disturb data taking. We have complemented the original loop-free HLT chain with ZeroMQ data-transfer components. The ZeroMQ components facilitate a feedback loop that inserts the calibration result created at the end of the chain back into tracking components at the beginning of the chain, after a

  8. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL

    Directory of Open Access Journals (Sweden)

    Fernando Henrique Lermen

    2016-09-01

    Full Text Available The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.

  9. Healthcare Cost and Utilization Project (HCUP) - National Inpatient Sample

    Data.gov (United States)

    U.S. Department of Health & Human Services — 2001 forward. The National (Nationwide) Inpatient Sample (NIS) is part of a family of databases and software tools developed for the Healthcare Cost and Utilization...

  10. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  11. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  12. Projected Costs of Generating Electricity - 2015 Edition. Executive Summary

    International Nuclear Information System (INIS)

    2015-01-01

    This joint report by the International Energy Agency (IEA) and the Nuclear Energy Agency (NEA) is the eighth in a series of studies on electricity generating costs. As policy makers work to ensure that the power supply is reliable, secure and affordable, while making it increasingly clean and sustainable in the context of the debate on climate change, it is becoming more crucial that they understand what determines the relative cost of electricity generation using fossil fuel, nuclear or renewable sources of energy. A wide range of fuels and technologies are presented in the report, including natural gas, coal, nuclear, hydro, solar, onshore and offshore wind, biomass and biogas, geothermal, and combined heat and power, drawing on a database from surveys of investment and operating costs that include a larger number of countries than previous editions. The analysis of more than 180 plants, based on data covering 22 countries, reveals several key trends, pointing, for example, to a significant decline in recent years in the cost of renewable generation. The report also reveals that nuclear energy costs remain in line with the cost of other base-load technologies, particularly in markets that value de-carbonisation. Overall, cost drivers of the different generating technologies remain both market-specific and technology-specific. Readers will find a wealth of details and analysis, supported by over 200 figures and tables, underlining this report's value as a tool for decision makers and researchers concerned with energy policies, climate change and the evolution of power sectors around the world. (authors)

  13. Low-cost rural surface alternatives : demonstration project.

    Science.gov (United States)

    2015-06-01

    The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to : granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa....

  14. Cost estimate modeling of transportation management plans for highway projects.

    Science.gov (United States)

    2012-05-01

    Highway rehabilitation and reconstruction projects frequently cause road congestion and increase safety concerns while limiting access for road users. State Transportation Agencies (STAs) are challenged to find safer and more efficient ways to renew ...

  15. 13 CFR 120.882 - Eligible Project costs for 504 loans.

    Science.gov (United States)

    2010-01-01

    ... financing including points, fees and interest. (e) If the project involves expansion of a small business... expansion of a small business concern” includes any project that involves the acquisition, construction or... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Eligible Project costs for 504...

  16. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  17. Stochastic project networks temporal analysis, scheduling and cost minimization

    CERN Document Server

    Neumann, Klaus

    1990-01-01

    Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does no...

  18. Electron Attenuation Measurement using Cosmic Ray Muons at the MicroBooNE LArTPC

    Energy Technology Data Exchange (ETDEWEB)

    Meddage, Varuna [Kansas State U., Manhattan

    2017-10-01

    The MicroBooNE experiment at Fermilab uses liquid argon time projection chamber (LArTPC) technology to study neutrino interactions in argon. A fundamental requirement for LArTPCs is to achieve and maintain a low level of electronegative contaminants in the liquid to minimize the capture of drifting ionization electrons. The attenuation time for the drifting electrons should be long compared to the maximum drift time, so that the signals from particle tracks that generate ionization electrons with long drift paths can be detected efficiently. In this talk we present MicroBooNE measurement of electron attenuation using cosmic ray muons. The result yields a minimum electron 1/e lifetime of 18 ms under typical operating conditions, which is long compared to the maximum drift time of 2.3 ms.

  19. Performance of a MICROMEGAS-based TPC in a high-energy neutron beam

    Science.gov (United States)

    Snyder, L.; Manning, B.; Bowden, N. S.; Bundgaard, J.; Casperson, R. J.; Cebra, D. A.; Classen, T.; Duke, D. L.; Gearhart, J.; Greife, U.; Hagmann, C.; Heffner, M.; Hensle, D.; Higgins, D.; Isenhower, D.; King, J.; Klay, J. L.; Geppert-Kleinrath, V.; Loveland, W.; Magee, J. A.; Mendenhall, M. P.; Sangiorgio, S.; Seilhan, B.; Schmitt, K. T.; Tovesson, F.; Towell, R. S.; Walsh, N.; Watson, S.; Yao, L.; Younes, W.

    2018-02-01

    The MICROMEGAS (MICRO-MEsh GAseous Structure) charge amplification structure has found wide use in many detection applications, especially as a gain stage for the charge readout of Time Projection Chambers (TPCs). Here we report on the behavior of a MICROMEGAS TPC when operated in a high-energy (up to 800 MeV) neutron beam. It is found that neutron-induced reactions can cause discharges in some drift gas mixtures that are stable in the absence of the neutron beam. The discharges result from recoil ions close to the MICROMEGAS that deposit high specific ionization density and have a limited diffusion time. For a binary drift gas, increasing the percentage of the molecular component (quench gas) relative to the noble component and operating at lower pressures generally improves stability.

  20. The $\\mu$TPC Method: Improving the Position Resolution of Neutron Detectors Based on MPGDs

    CERN Document Server

    Pfeiffer, Dorothea; Birch, Jens; Hall-Wilton, Richard; Höglund, Carina; Hultman, Lars; Iakovidis, George; Oliveri, Eraldo; Oksanen, Esko; Ropelewski, Leszek; Thuiner, Patrik

    2015-01-01

    Due to the Helium-3 crisis, alternatives to the standard neutron detection techniques are becoming urgent. In addition, the instruments of the European Spallation Source (ESS) require advances in the state of the art of neutron detection. The instruments need detectors with excellent neutron detection efficiency, high-rate capabilities and unprecedented spatial resolution. The Macromolecular Crystallography instrument (NMX) requires a position resolution in the order of 200 um over a wide angular range of incoming neutrons. Solid converters in combination with Micro Pattern Gaseous Detectors (MPGDs) are proposed to meet the new requirements. Charged particles rising from the neutron capture have usually ranges larger than several millimetres in gas. This is apparently in contrast with the requirements for the position resolution. In this paper, we present an analysis technique, new in the field of neutron detection, based on the Time Projection Chamber (TPC) concept. Using a standard Single-GEM with the catho...

  1. Heavy-ion test of detectors with conventional and resistive Micromegas used in TPC configuration

    Energy Technology Data Exchange (ETDEWEB)

    Ducret, Jean-Eric, E-mail: jean-eric.ducret@cea.f [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); Legou, Philippe [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); Lukasik, Jerzy [Institute of Nuclear Physics, IFJ-PAN, ul. Radzikowskiego 152, 31-342 Krakow (Poland); Boudard, Alain; Combet, Michel [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); Czech, BronisLaw [Institute of Nuclear Physics, IFJ-PAN, ul. Radzikowskiego 152, 31-342 Krakow (Poland); Durand, Robert; Gorbinet, Thomas; Le Bourlout, Pascal; Leray, Sylvie [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); Matousek, Vladislav [Institute of Physics, Slovak Academy of Sciences, Dubravska cesta 9, 854 11 Bratislava (Slovakia); Nizery, Francois [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); PawLowski, Piotr [Institute of Nuclear Physics, IFJ-PAN, ul. Radzikowskiego 152, 31-342 Krakow (Poland); Salsac, Marie-Delphine [Commissariat a l' Energie Atomique, IRFU, F91191 Gif sur Yvette (France); Yordanov, Orlin [Institute of Nuclear Research and Nuclear Energy, Bulgarian Academy of Sciences, 72, Tzanigradsko chaussee Blvd, BG-1784 Sofia (Bulgaria)

    2011-02-01

    We have performed tests of Micromegas detector prototypes using the heavy-ion beams from the SIS synchrotron of GSI (Darmstadt, Germany). The beams varied from {sup 12}C{sup 6+} to {sup 179}Au{sup 65+} and from 250 to 1000 MeV per nucleon. We have tested two amplification technologies, conventional and resistive Micromegas, and two construction concepts, bulk-Micromegas and micro-meshes screwed on the PCB. The obtained position resolution below 200{mu}m for 5 mm wide strips implies that the bulk resistive Micromegas technology might meet the requirements of the future R3B TPC project. We also developed a fast and very low noise front-end electronics connected directly to the Printed Circuit Board (PCB) of the detector itself. This concept has shown very good performances and robustness.

  2. For high energy heavy ion experiments TPC 4π detector 'Diogene'. What possibilities and what physics

    International Nuclear Information System (INIS)

    Babinet, R.; Cassagnou, Y.; Drouet, M.

    1981-05-01

    'Diogene' is the name of a 4π solid angle detector, based on a Time Projection Chamber (TPC), designed to perform exclusive measurements of charged particles emitted in central collisions of relativistic heavy ions. Exclusive measurements of all charged particles emitted in central collisions of relativistic heavy ions are becoming more and more necessary in this field of nuclear physics in order to answer some crucial questions such as: what is the degree of compression achieved in these collisions. What is the behavior of nuclear matter at high degree of excitation as well as compression. The possibility of handling high multiplicities up to 40 or 60; a momentum measurement of all particles, with not too bad a resolution, up to about 1.5 GeV/c; a good particle identification between π +- , p, d, t ..

  3. Cost estimation in software engineering projects with web components development

    Directory of Open Access Journals (Sweden)

    Javier de Andrés

    2015-01-01

    Full Text Available Existen multitud de modelos propuestos para la predicción de co stes en proyectos de software, al gunos orientados específicamen te para proyectos Web. Este trabajo analiza si los modelos específicos para proyectos Web están justifi cados, examinando el comportami ento diferencial de los costes entre proyectos de desarrollo softwar e Web y no Web. Se analizan dos aspectos del cálculo de costes: las deseconomías de escala, y el im pacto de algunas características de estos proyectos que son utilizadas como cost drivers. Se en uncian dos hipótesis: (a en estos proyect os las deseconomías de escala so n mayores y (b el incremento de coste que provocan los cost dr ivers es menor para los proyectos Web. Se contrastaron estas hipótesis a nalizando un conjunto de proyectos reales. Los resultados sugie ren que ambas hipótesis se cumplen. Por lo tanto, la principal contribu ción a la literatura de esta inv estigación es que el desarrollo de modelos específicos para los proyectos Web está justificado.

  4. ArgonCube: a novel, fully-modular approach for the realization of large-mass liquid argon TPC neutrino detectors

    CERN Document Server

    Amsler, C; Asaadi, J; Auger, M; Barbato, F; Bay, F; Bishai, M; Bleiner, D; Borgschulte, A; Bremer, J; Cavus, E; Chen, H; De Geronimo, G; Ereditato, A; Fleming, B; Goldi, D; Hanni, R; Kose, U; Kreslo, I; La Mattina, F; Lanni, F; Lissauer, D; Luthi, M; Lutz, P; Marchionni, A; Mladenov, D; Nessi, M; Noto, F; Palamara, O; Raaf, J L; Radeka, V; Rudolph Von Rohr, Ch; Smargianaki, D; Soderberg, M; Strauss, Th; Weber, M; Yu, B; Zeller, G P; Zeyrek, M; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2015-01-01

    The Liquid Argon Time Projection Chamber is a prime candidate detector for future neutrino oscillation physics experiments, underground neutrino observatories and proton decay searches. A large international project based on this technology is currently being considered at the future LBNF facility in the United States on the very large mass scale of 40 kton. In this document, following the long standing R&D work conducted over the last years in several laboratories in Europe and in the United States, we intend to propose a novel Liquid Argon TPC approach based on a fully-modular, innovative design, the ArgonCube. The related R&D work will proceed along two main directions; one aimed at on the assessment of the proposed modular detector design, the other on the exploitation of new signal readout methods. Such a strategy will provide high performance while being cost-effective and robust at the same time. According to our plans, we will firstly realize a detector prototype hosted in a cryostat that is a...

  5. Progress on a spherical TPC for low energy neutrino detection

    International Nuclear Information System (INIS)

    Aune, S; Colas, P; Deschamps, H; Dolbeau, J; Fanourakis, G; Ribas, E Ferrer; Enqvist, T; Geralis, T; Giomataris, Y; Gorodetzky, P; Gounaris, G J; Gros, M; Irastorza, I G; Kousouris, K; Lepeltier, V; Morales, J; Patzak, T; Paschos, E A; Salin, P; Savvidis, I; Vergados, J D

    2006-01-01

    The new concept of the spherical TPC aims at relatively large target masses with low threshold and background, keeping an extremely simple and robust operation. Such a device would open the way to detect the neutrino-nucleus interaction, which, although a standard process, remains undetected due to the low energy of the neutrino-induced nuclear recoils. The progress in the development of the first 1 m 3 prototype at Saclay is presented. Other physics goals of such a device could include supernova detection, low energy neutrino oscillations and study of non-standard properties of the neutrino, among others

  6. A 4π tracking TPC magnetic spectrometer for RHIC

    International Nuclear Information System (INIS)

    Danby, G.; Eiseman, S.E.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Van Dijk, J.H.; Lindenbaum, S.J.; Chan, C.S.; Kramer, M.A.; Zhao, K.; Biswas, N.; Kenney, P.; Piekarz, J.; Adams, D.L.; Ahmad, S.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Empl, T.; Miettinen, H.E.; Mutchler, G.S.; Roberts, J.B.; Skeens, J.

    1990-01-01

    The primary physics objective of the 4π TPC magnetic spectrometer proposal is to search for the Quark-Gluon Plasma. In previous workshops we have discussed what the possible hadronic signatures of such a state of matter would be. Succinctly, the QGP is a direct prediction of non-perturbative QCD. Therefore the question of the existence of this new state of matter bears directly on the validity of non-perturbative QCD. However, since non-perturbative QCD has never been established, it is apparent that what may await us is a host of new phenomena that will go beyond the standard model

  7. Costing the EPR Project Using the Real Options Method

    International Nuclear Information System (INIS)

    Epaulard, Anne; Gallon, Stephane

    2001-01-01

    Real options theory makes it possible to cost investments which offer flexibility but whose returns are uncertain, such as the construction in 2000 of an EPR prototype; this prototype will enable the European pressurised-water reactor (EPR) to be used to renew EDF's nuclear power stations in 2020 (flexibility) but its economic worth will then depend on the cost of the competing gas-fired power plants (uncertain return). Options theory shows that investing in EPR technology in 2000 provides sufficient flexibility in 2020 to be considered cost-effective, even though use of EPRs is unlikely by that date. The investment made in 2000 to develop EPR technology therefore actually plays the part of an option or, in other words, insurance (against the risk of high gas prices)

  8. The efficacy of Jackson drain in the application to be a tunnel pleural catheter (TPC) in the management of malignant pleural effusion.

    Science.gov (United States)

    Tscheikuna, Jamsak; Thomrongpairoj, Preecha; Disayabutr, Suppareurg

    2011-06-01

    Malignant pleural effusion (MPE) is a common clinical problem in patients with advanced cancer and portends a poor prognosis, which means survival of less than six months. In June 1997, the US-FDA approved an indwelling TPC with a one-way drainage valve to be used in the management of MPE. Although popularity of this TPC has increased over the past few years, the experience with this device remains limited in Thai patients. One of the reasons is its high cost. Assess the efficacy and the safety of customary indwelling TPC by using Jackson drain in the management of patients with symptomatic MPE. Ten patients with symptomatic MPE were receiving these catheters (18 Fr Silicone catheters with 25 cm fenestrated length) to drain effusion via plastic vacuum bottles (250 ml) every other day or as needed to relieve dyspnea. The patient's dyspnic respiration, quality of life, and comfort during the catheter's application were quantified with a Borg score, the St. George Respiratory Disease Questionnaire (SGRQ), and the comfort's score, respectively. These parameters were recorded at initial (before insertion) and 2-week follow-up visit. Pain after 24 hours of each insertion was quantified by visual pain analogue scale (VPAS). Patients were followed until either death or catheter removal. The Borg score, SGRQ, and comfort's score showed significant improvement at 2-week visit (p drain was effective in the treatment of MPE as a TPC without early complications.

  9. Cost-Benefit Analysis for Investment Decisions: Chapter 16 (Cost-Benefit Analysis of Transportation Projects)

    OpenAIRE

    Glenn Jenkins; Chun-Yan Kuo; Arnold C. Harberger

    2011-01-01

    This chapter will focus on the problems of evaluating transportation projects in the context of the less-developed countries. Emphasis will be placed on highway projects, because these account for the bulk of transport investments in the developing parts of the world. If a project passes a straight financial test, based on the present value of its cash inflows and outflows, projects would only come if this financial NPV were outweighed by the present value of the project’s various externali...

  10. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones-Albertus, Rebecca [U.S. Department of Energy

    2018-04-02

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as well as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.

  11. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  12. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  13. 523 factors influencing direct costs dynamics of building projects

    African Journals Online (AJOL)

    Osondu

    2013-08-16

    Aug 16, 2013 ... effect of the direct cost variation factors (p-values between 0.365 and 0.930). Construction, resources, and performance factors are the most significant of the groups (MS range = 3.66 to 4.33), though no .... financial control on site ranked first and second ... order according to the consultants were, inflation.

  14. 24 CFR 954.303 - Eligible project costs.

    Science.gov (United States)

    2010-04-01

    ... meet the applicable new construction standards of the grantee and the Model Energy Code referred to in... more per home) the cost of funding an initial operating deficit reserve, which is a reserve to meet any... only be used to pay operating expenses, reserve for replacement payments, and debt service. Any HOME...

  15. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  16. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  17. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  18. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  19. Readout and trigger electronics for the TPC vertex chamber

    International Nuclear Information System (INIS)

    Ronan, M.T.; Jared, R.C.; McGathen, T.K.; Eisner, A.M.; Broeder, W.J.; Godfrey, G.L.

    1987-10-01

    The introduction of the vertex chamber required the addition of new front-end electronics and a new 1024-channel, high-accuracy TDC system. The preamplifier/discriminator should be capable of triggering on the first electrons and the time digitzer should preserve the measurement resolution. For the TDC's, in order to maintain compatibility with the existing TPC readout system, an upgrade of a previous inner drift chamber digitizer system has been chosen. Tests of the accuracy and stability of the original design indicated that the new design specifications would be met. The TPC detector requires a fast pretrigger to turn on its gating grid within 500 ns of the e/sup +/e/sup -/ beam crossing time, to minimize the loss of ionization information. A pretrigger based on the Straw Chamber signals, operating at a rate of about 2 K/sec, will be used for charged particle final states. In addition, in order to reject low mass Two-Photon events at the final trigger level, an accurate transverse momentum cutoff will be made by the Straw Chamber trigger logic. In this paper, we describe the readout and trigger electronics systems which have been built to satisfy the above requirements. 5 refs., 8 figs

  20. Cost Overruns in Large-scale Transportation Infrastructure Projects

    DEFF Research Database (Denmark)

    Cantarelli, Chantal C; Flyvbjerg, Bent; Molin, Eric J. E

    2010-01-01

    is also considered possible. Non-political explanations are diverse in character, therefore a range of different theories (including rational choice theory and prospect theory), depending on the kind of explanation is considered more appropriate than one all-embracing theory........ Overall, four categories of explanations can be distinguished: technical, economic, psychological, and political. Political explanations have been seen to be the most dominant explanations for cost overruns. Agency theory is considered the most interesting for political explanations and an eclectic theory...

  1. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  2. The Current and Projected Taxpayer Shares of US Health Costs.

    Science.gov (United States)

    Himmelstein, David U; Woolhandler, Steffie

    2016-03-01

    We estimated taxpayers' current and projected share of US health expenditures, including government payments for public employees' health benefits as well as tax subsidies to private health spending. We tabulated official Centers for Medicare and Medicaid Services figures on direct government spending for health programs and public employees' health benefits for 2013, and projected figures through 2024. We calculated the value of tax subsidies for private spending from official federal budget documents and figures for state and local tax collections. Tax-funded health expenditures totaled $1.877 trillion in 2013 and are projected to increase to $3.642 trillion in 2024. Government's share of overall health spending was 64.3% of national health expenditures in 2013 and will rise to 67.1% in 2024. Government health expenditures in the United States account for a larger share of gross domestic product (11.2% in 2013) than do total health expenditures in any other nation. Contrary to public perceptions and official Centers for Medicare and Medicaid Services estimates, government funds most health care in the United States. Appreciation of government's predominant role in health funding might encourage more appropriate and equitable targeting of health expenditures.

  3. Heavy ion reaction measurements with the EOS TPC (looking for central collisions with missing energy)

    International Nuclear Information System (INIS)

    Wieman, H.H.

    1994-05-01

    The EOS TPC was constructed for complete event measurement of heavy ion collisions at the Bevalac. We report here on the TPC design and some preliminary measurements of conserved event quantities such as total invariant mass, total momentum, total A and Z

  4. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  5. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  6. Highly Integrated Mixed-Mode Electronics for the readout of Time Projection Chambers

    CERN Document Server

    França Santos, Hugo Miguel; Musa, Luciano

    Time Projection Chambers (TPCs) are one of the most prevalent particle trackers for high-energy physics experiments. Future planed TPCs for the International Linear Collider (ILC) and the Compact Linear Collider (CLIC) entail very high spatial resolution in large gas volumes, but impose low material budget for the end caps of the TPC cylinder. This constraint is not accomplished with the state-of-the-art front-end electronics because of its unsuited relatively large mass and of its associated water cooling system. To reach the required material budget, highly compact and power efficient dedicated TPC front-end electronics should be developed. This project aims at re-designing the different electronic elements with significant improvements in terms of performance, power efficiency and versatility, and developing an integrated circuit that merges all components of the front-end electronics. This chip ambitions a large volume production at low unitary cost and its employment in multiple detectors. The design of ...

  7. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  8. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  9. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  10. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  11. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  12. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  13. The Project Of Another Low-Cost Metaphase Finder

    International Nuclear Information System (INIS)

    Furukawa, Akira

    2016-01-01

    The most popular and 'gold standard' phenomenon in Biological dosimetry is the appearance of dicentric chromosomes in metaphase in white blood cells. The metaphase finder is a tool for biological dosimetry that finds metaphase cells on slide glasses. The author and a software company were using new special software that was faster than conventional systems. A Nikon Eclipse Ni-E microscope with motorised X-Y stage, 4x objective lens and 1920 x 1024 pixels colour camera for hardware were used. The software uses mathematical morphology filters. The new system was compact and low-priced. And the remarkable point is, this system can be applicable not only to human blood, but also to non-human samples. The speed was 208-236 s per 5 x 20 mm area, while capturing 378 images, which achieved the aim of the project. The false-positive ratio achieved below 5% in some slides. (author)

  14. Recent advances with a hybrid micro-pattern gas detector operated in low pressure H2 and He, for AT-TPC applications

    Directory of Open Access Journals (Sweden)

    Cortesi Marco

    2018-01-01

    Full Text Available In view of a possible application as a charge-particle track readout for an Active-Target Time Projection Chamber (AT-TPC, the operational properties and performances of a hybrid Micro-Pattern Gaseous Detector (MPGD were investigated in pure low-pressure Hydrogen (H2 and Helium (He. The detector consists of a MICROMEsh GAseous Structure (MICROMEGAS coupled to a two-cascade THick Gaseous Electron Multiplier (THGEM as a pre-amplification stage. This study reports the effective gain dependence of the hybrid-MPGD at relevant pressure (in the range of 200-760 torr for different detector arrangements. The results of this work are relevant in the field of avalanche mechanism in low-pressure, low-mass noble gases, in particularly for applications of MPGD end-cap readout for active-target Time Projection Chambers (TPC in the field of nuclear physics and nuclear astrophysics.

  15. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  16. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  17. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  18. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    NARCIS (Netherlands)

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by

  19. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  20. Bottom-up comparisons of CO2 storage and costs in forestry and biomass energy projects

    International Nuclear Information System (INIS)

    Swisher, J.N.

    1993-01-01

    In order to include forestry and biomass energy projects in a possible CO 2 emission reduction regime, and to compare the costs of individual projects or national programs, it is necessary to determine the rate of equivalency between carbon in fossil fuel emissions and carbon stored in different types of forestry, biomass and renewable energy projects. This paper presents a comprehensive and consistent methodology to account for the costs and carbon flows of different categories of forestry and biomass energy projects and describes the application of the methodology to several sets of projects in Latin America. The results suggest that both biomass energy development and forestry measures including reforestation and forest protection can contribute significantly to the reduction of global CO 2 emissions, and that local land-use capacity must determine the type of project that is appropriate in specific cases. No single approach alone is sufficient as either a national or global strategy for sustainable land use or carbon emission reduction

  1. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  2. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  3. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  4. Topological signature in the NEXT high pressure xenon TPC

    Science.gov (United States)

    Ferrario, Paola; NEXT Collaboration

    2017-09-01

    The NEXT experiment aims to observe the neutrinoless double beta decay of 136Xe in a high-pressure xenon gas TPC using electroluminescence to amplify the signal from ionization. One of the main advantages of this technology is the possibility to use the topology of events with energies close to Qββ as an extra tool to reject background. In these proceedings we show with data from prototypes that an extra background rejection factor of 24.3 ± 1.4 (stat.)% can be achieved, while maintaining an efficiency of 66.7 ± 1.% for signal events. The performance expected in NEW, the next stage of the experiment, is to improve to 12.9% ± 0.6% background acceptance for 66.9% ± 0.6% signal efficiency.

  5. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  6. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  7. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  8. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  9. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  10. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  11. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  12. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  13. The cost of solar refrigeration: The rococo project; Was solare Kuehlung kostet - das Rococo-Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, J.P.

    2008-01-21

    The cost of modern solar refrigerators is between 1,300 and 8,000 Euros per kW of refrigeration capacity. The biggest potential for savings is in the peripheral components, as well as in the operating cost and especially in servicing. Cost reduction must have priority if solar refrigeration is to be successful in the market. In the context of the European research project ''Reduction of costs of Solar Cooling systems'' (Rococo), a team of scientists from France, Spain and Austria investigated existing systems. (orig.)

  14. Estimating Total Program Cost of a Long-Term, High-Technology, High-Risk Project with Task Durations and Costs That May Increase Over Time

    National Research Council Canada - National Science Library

    Brown, Gerald G; Grose, Roger T; Koyak, Robert A

    2006-01-01

    .... Each task suffers some risk of delay and changed cost. Ignoring budget constraints, we use Monte Carlo simulation of the duration of each task in the project to infer the probability distribution of the project completion time...

  15. A GEM-TPC prototype with low-Noise highly integrated front-end electronics for linear collider studies

    CERN Document Server

    Kappler, Steffen; Kaminski, Jochen; Ledermann, Bernhard; Müller, Thomas; Ronan, Michael T; Ropelewski, Leszek; Sauli, Fabio; Settles, Ronald

    2004-01-01

    Connected to the linear collider project, studies on the readout of time projection chambers (TPCs) based on the gas electron multiplier (GEM) are ongoing. Higher granularity and intrinsically suppressed ion feedback are the major advantages of this technology. After a short discussion of these issues, we present the design of a small and very flexible TPC prototype, whose cylindrical drift volume can be equipped with endcaps of different gas detector types. An endcap with multi-GEM readout is currently set up and successfully operated with a low-noise highly integrated front-end electronics. We discuss results of measurements with this system in high intensity particle beams at CERN, where 99.3 plus or minus 0.2% single-pad-row efficiency could be achieved at an effective gain of 2.5 multiplied by 10**3 only, and spatial resolutions down to 63 plus or minus 3 mum could be demonstrated. Finally, these results are extrapolated to the high magnetic field in a linear collider TPC. 5 Refs.

  16. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  17. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  18. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  19. Procedures for initiation, cost-sharing and management of OECD projects in nuclear safety

    International Nuclear Information System (INIS)

    2002-01-01

    , finances and management should be considered in order to accommodate requirements and boundary conditions that might differ from case to case. Flexibility might include consideration of in-kind contributions when applicable for project furtherance. This proposal is primarily concerned with projects that are organised by the NEA secretariat upon CSNI recommendations and initiative. One should also notice that the NEA Nuclear Safety Division has for some time operated a database on common cause events denominated ICDE. Two additional databases, one on fire events (FIRE database) and one on piping failure (OPDE database) have started in 2002. They are smaller projects, which do not have a host country. These procedures apply also to these projects, with the exception that, for the latter ones, costs are equally shared among participants

  20. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  1. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  2. Project-Based Emissions Trading. The Impact of Institutional Arrangements on Cost-Effectiveness

    International Nuclear Information System (INIS)

    Woerdman, E.; Van der Gaast, W.

    2001-01-01

    In this paper we demonstrate that the institutional arrangement (or: design) of Joint Implementation (JI) and the Clean Development Mechanism (CDM) has a decisive impact on their cost-effectiveness. We illustrate our arguments by statistically analyzing the costs from 94 Activities Implemented Jointly (AIJ) pilot phase projects as well as by adjusting these data on the basis of simple mathematical formulas. These calculations explicitly take into account the institutional differences between JI (sinks, no banking) and the CDM (banking, no sinks) under the Kyoto Protocol and also show the possible effects on credit costs of alternative design options. However, our numerical illustrations should be viewed with caution, because AIJ is only to a limited extent representative of potential future JI and CDM projects and because credit costs are not credit prices. Some of the main figures found in this study are: an average cost figure per unit of emission reduction for AIJ projects of 46 dollar per ton of carbon dioxide equivalent ($/Mg CO 2 -eq), an average potential JI credit cost figure which is lowered to 37 $/Mg CO 2 -eq by introducing banking and an average of 6 $/Mg CO 2 -eq per credit for potential low-cost CDM projects which includes sinks. However, at CoP6 in November 2000 in The Hague (The Netherlands), the Parties to the Framework Convention on Climate Change (FCCC) did not (yet) reach consensus on the institutional details of the project-based mechanisms, such as the possible arrangement of early JI action or the inclusion of sinks under the CDM. 55 refs

  3. ArgonCube: a Modular Approach for Liquid Argon TPC Neutrino Detectors for Near Detector Environments

    CERN Document Server

    Auger, M; Sinclair, JR

    2017-01-01

    Liquid Argon Time Projection Chambers (LAr TPCs) are an ideal detector candidate for future neutrino oscillation physics experiments, underground neutrino observatories and proton decay searches. A large international project based on this technology is currently under consideration at the future LBNF/DUNE facility in the United States. That particular endeavor would be on the very large mass scale of 40~kt. Following diverse and long standing R\\&D work conducted over several years, with contributions from international collaborators, we propose a novel LAr TPC based on a fully-modular, innovative design, ArgonCube. ArgonCube will demonstrate that LAr TPCs are a viable detector technology for high-energy and high-multiplicity environments, such as the DUNE near detector. Necessary R\\&D work is proceeding along two main pathways; the first, aimed at the demonstration of modular detector design and the second, at the exploration of new signal readout methods. This two-pronged approach has provided a hig...

  4. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  5. Impact of accelerator based technologies on nuclear fission safety - Share cost project of the European Community

    International Nuclear Information System (INIS)

    1997-01-01

    As a result of the growing interest in Accelerator-Driven Systems (ADS), some European institutes have established a shared cost project in the framework of the European Community. The overall objective of the project is to make an assessment of the possibilities of accelerator-driven hybrid reactor systems from the point of view of safe energy production, minimum waste production and transmutation capabilities

  6. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    OpenAIRE

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is a...

  7. Surfactant mediated extraction of total phenolic contents (TPC) and antioxidants from fruits juices.

    Science.gov (United States)

    Sharma, Shweta; Kori, Shivpoojan; Parmar, Ankush

    2015-10-15

    The aim of this study was to enhance the extraction of total phenolic contents (TPC) and antioxidants from fruit juices by the application of surfactants formulations instead of conventional solvents (methanol, ethanol and acetone). A variety of fruit infusions: apple red delicious (apple (rd)) (Malus domestica), Mcintosh apple (apple (i)) (Malus pumila), sweet lemon (Citrus limetta) and mango (Magnifera indica) were studied. Effect of water, organic solvents and five different aqueous surfactant formulations viz. SDS, Brij-35, Brij-58, Triton X-100 and Span-40 were explored for the extraction of TPC and determining the antioxidant activity (AA). The TPC and AA (%) were determined using Folin-Ciocalteu (FCA) and DPPH assay, respectively. The effect of surfactant type, concentration and common organic solvents on the extraction of TPC and AA (%) was studied using UV-visible spectrophotometric technique. Among all the extracting systems employed, Brij-58 showed the highest extraction efficiency. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  9. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Science.gov (United States)

    2010-04-01

    ... breakdown of all project costs and that each cost element making up the project be reviewed for... either a firm commitment of its funds or a decision not to participate in the project; and B. Equity... his/her motivation remains high to pursue the business with vigor. The amount, type and terms of the...

  10. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  11. Measurement of 1.7–74 MeV polarised γ rays with the HARPO TPC

    Energy Technology Data Exchange (ETDEWEB)

    Geerebaert, Y., E-mail: yannick.geerebaert@polytechnique.fr [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Gros, Ph., E-mail: philippe.gros@llr.in2p3.fr [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Amano, S. [LASTI, University of Hyôgo (Japan); Attié, D. [CEA, Irfu, CEA-Saclay (France); Bernard, D.; Bruel, P. [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Calvet, D.; Colas, P. [CEA, Irfu, CEA-Saclay (France); Daté, S. [JASRI/SPring8 (Japan); Delbart, A. [CEA, Irfu, CEA-Saclay (France); Frotin, M.; Giebels, B. [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Götz, D. [AIM, CEA/DSM-CNRS – Université Paris Diderot (France); IRFU/Service d' Astrophysique, CEA-Saclay (France); Hashimoto, S. [LASTI, University of Hyôgo (Japan); Horan, D. [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Kotaka, T. [LASTI, University of Hyôgo (Japan); Louzir, M. [LLR, École Polytechnique, CNRS/IN2P3, Palaiseau (France); Minamiyama, Y.; Miyamoto, S. [LASTI, University of Hyôgo (Japan); Ohkuma, H. [JASRI/SPring8 (Japan); and others

    2017-02-11

    Current γ-ray telescopes based on photon conversions to electron-positron pairs, such as Fermi, use tungsten converters. They suffer of limited angular resolution at low energies, and their sensitivity drops below 1 GeV. The low multiple scattering in a gaseous detector gives access to higher angular resolution in the MeV–GeV range, and to the linear polarisation of the photons through the azimuthal angle of the electron-positron pair. HARPO is an R&D programme to characterise the operation of a TPC (Time Projection Chamber) as a high angular-resolution and sensitivity telescope and polarimeter for γ rays from cosmic sources. It represents a first step towards a future space instrument. A 30 cm cubic TPC demonstrator was built, and filled with 2 bar argon-based gas. It was put in a polarised γ-ray beam at the NewSUBARU accelerator in Japan in November 2014. Data were taken at different photon energies from 1.7 MeV to 74 MeV, and with different polarisation configurations. The electronics setup is described, with an emphasis on the trigger system. The event reconstruction algorithm is quickly described, and preliminary measurements of the polarisation of 11 MeV photons are shown.

  12. TREX-DM: a low-background Micromegas-based TPC for low-mass WIMP detection

    Energy Technology Data Exchange (ETDEWEB)

    Iguaz, F.J.; Garza, J.G.; Castel, J.F.; Cebrian, S.; Dafni, T.; Garcia, J.A.; Irastorza, I.G.; Lagraba, A.; Luzon, G.; Peiro, A. [Universidad de Zaragoza, Grupo de Fisica Nuclear y Astroparticulas, Zaragoza (Spain); Aznar, F. [Universidad de Zaragoza, Grupo de Fisica Nuclear y Astroparticulas, Zaragoza (Spain); Universidad de Zaragoza, Centro Universitario de la Defensa, Zaragoza (Spain)

    2016-10-15

    If Dark Matter is made of Weakly Interacting Massive Particles (WIMPs) with masses below ∝20 GeV, the corresponding nuclear recoils in mainstream WIMP experiments are of energies too close, or below, the experimental threshold. Gas Time Projection Chambers (TPCs) can be operated with a variety of target elements, offer good tracking capabilities and, on account of the amplification in gas, very low thresholds are achievable. Recent advances in electronics and in novel radiopure TPC readouts, especially micro-mesh gas structure (Micromegas), are improving the scalability and low-background prospects of gaseous TPCs. Here we present TREX-DM, a prototype to test the concept of a Micromegas-based TPC to search for low-mass WIMPs. The detector is designed to host an active mass of ∝0.300 kg of Ar at 10 bar, or alternatively ∝0.160 kg of Ne at 10 bar, with an energy threshold below 0.4 keVee, and is fully built with radiopure materials. We will describe the detector in detail, the results from the commissioning phase on surface, as well as a preliminary background model. The anticipated sensitivity of this technique may go beyond current experimental limits for WIMPs of masses of 2-8 GeV. (orig.)

  13. The WA105-3x1x1 m3 dual phase LAr-TPC demonstrator

    CERN Document Server

    Murphy, Sebastien

    2016-11-15

    The dual phase Liquid Argon Time Projection Chamber (LAr TPC) is the state-of-art technology for neutrino detection thanks to its superb 3D tracking and calorimetry performance. Its main feature is the charge amplification in gas argon which provides excellent signal-to-noise ratio. Electrons produced in the liquid argon are extracted in the gas phase. Here, a readout plane based on Large Electron Multiplier detectors provides amplification of the charges before its collection onto an anode with strip readout. The charge amplification enables constructing fully homoge- nous giant LAr-TPCs with tuneable gain, excellent charge imaging performance and increased sensitivity to low energy events. Following a staged approach the WA105 collaboration is con- structing a dual phase LAr-TPC with an active volume of 3x1x1m3 that will soon be tested with cosmic rays. Its construction and operation aims to test scalable solutions for the crucial aspects of this technology: ultra high argon purity in non-evacuable tank, la...

  14. The ALICE TPC, a large 3-dimensional tracking device with fast readout for ultra-high multiplicity events

    CERN Document Server

    INSPIRE-00249819; Appelshauser, H.; Bablok, S.; Bialas, N.; Bolgen, R.; Bonnes, U.; Bramm, R.; Braun-Munzinger, P.; Campagnolo, R.; Christiansen, P.; Dobrin, A.; Engster, C.; Fehlker, D.; Foka, Y.; Frankenfeld, U.; Gaardhoje, J.J.; Garabatos, C.; Glassel, P.; Gonzalez Gutierrez, C.; Gros, P.; Gustafsson, H.A.; Helstrup, H.; Hoch, M.; Ivanov, M.; Janik, R.; Junique, A.; Kalweit, A.; Keidel, R.; Kniege, S.; Kowalski, M.; Larsen, D.T.; Lesenechal, Y.; Lenoir, P.; Lindegaard, N.; Lippmann, C.; Mager, M.; Mast, M.; Matyja, A.; Munkejord, M.; Musa, L.; Nielsen, B.S.; Nikolic, V.; Oeschler, H.; Olsen, E.K.; Oskarsson, A.; Osterman, L.; Pikna, M.; Rehman, A.; Renault, G.; Renfordt, R.; Rossegger, S.; Rohrich, D.; Roed, K.; Richter, M.; Rueshmann, G.; Rybicki, A.; Sann, H.; Schmidt, H.R.; Siska, M.; Sitar, B.; Soegaard, C.; Soltveit, H.K.; Soyk, D.; Stachel, J.; Stelzer, H.; Stenlund, E.; Stock, R.; Strmen, P.; Szarka, I.; Ullaland, K.; Vranic, D.; Veenhof, R.; Westergaard, J.; Wiechula, J.; Windelband, B.

    2010-01-01

    The design, construction, and commissioning of the ALICE Time-Projection Chamber (TPC) is described. It is the main device for pattern recognition, tracking, and identification of charged particles in the ALICE experiment at the CERN LHC. The TPC is cylindrical in shape with a volume close to 90 m^3 and is operated in a 0.5 T solenoidal magnetic field parallel to its axis. In this paper we describe in detail the design considerations for this detector for operation in the extreme multiplicity environment of central Pb--Pb collisions at LHC energy. The implementation of the resulting requirements into hardware (field cage, read-out chambers, electronics), infrastructure (gas and cooling system, laser-calibration system), and software led to many technical innovations which are described along with a presentation of all the major components of the detector, as currently realized. We also report on the performance achieved after completion of the first round of stand-alone calibration runs and demonstrate result...

  15. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  16. Cost-benefit of the telecardiology service in the state of Minas Gerais: Minas Telecardio Project.

    Science.gov (United States)

    Andrade, Mônica Viegas; Maia, Ana Carolina; Cardoso, Clareci Silva; Alkmim, Maria Beatriz; Ribeiro, Antônio Luiz Pinho

    2011-10-01

    Telecardiology is a tool that can aid in cardiovascular care, mainly in towns located in remote areas. However, economic assessments on this subject are scarce and have yielded controversial results. To evaluate the cost-benefit of implementing a Telecardiology service in remote, small towns in the state of Minas Gerais, Brazil. The study used the database from the Minas Telecardio (MTC) Project, developed from June 2006 to November 2008, in 82 towns in the countryside of the state. Each municipality received a microcomputer with a digital electrocardiograph, with the possibility of transmitting ECG tracings and communicating with the on-duty cardiologist at the University hospital. The cost-benefit analysis was carried out by comparing the cost of performing an ECG in the project versus the cost of performing it by patient referral to another city. The average cost of an ECG in the MTC project was R$ 28.92, decomposed into R$ 8.08 for the cost of implementation and R$ 20.84 for maintenance. The cost simulation of the ECG with referral ranged from R$ 30.91 to R$ 54.58, with the cost-benefit ratio being always favorable to the MTC program, regardless of the type of calculation used for referral distance. The simulations considered the financial sponsor's and society's points-of-view. The sensitivity analysis with variation of calibration parameters confirmed these results. The implementation of a Telecardiology system as support to primary care in small Brazilian towns is feasible and economically beneficial, and can be used as a regular program within the Brazilian public health system.

  17. Doubling the Performance-Cost Ratio of PV by Using Cheap Mirrors - a Secondary School Project

    NARCIS (Netherlands)

    Breejen, H.; van Herwaarden, S.; Keijsers, B.; van Dijk, V.A.P.; van Sark, W.G.J.H.M.|info:eu-repo/dai/nl/074628526

    2007-01-01

    Reduction of cost is a major issue in the photovoltaics field. We have addressed this issue in a secondaryschool science project by considering the use of cheap mirrors in combination with solar panels, for application in developing countries. We have confirmed that it is possible to increase the

  18. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  19. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  20. Army Corps of Engineers: Cost Increases in Flood Control Projects and Improving Communication with Nonfederal Sponsors

    Science.gov (United States)

    2013-12-01

    such poor condition that it had to have major rehabilitation work performed. Work to fix the deteriorated tunnel cost $10 million more than had...originally been estimated.19 Corps officials on the Little Calumet project said during construction they encountered a former landfill along one portion

  1. Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs

    Directory of Open Access Journals (Sweden)

    Queena K. Qian

    2015-03-01

    Full Text Available Delivering green building (GB projects involve some activities that are atypical in comparison with conventional buildings. Such new activities are characterized by uncertainty, and they incur hidden costs that have not been expected nor are they readily appreciated among the stakeholders. This paper develops a typology and chronology to examine the new activities that are associated with transaction costs (TCs in the real estate development process (REDP of green building. Through in-depth interviews with representatives from the major developers in Hong Kong who have experiences in GB practice, this study aims to unearth TCs involved at the critical stages of the REDP. Apart from reconfirming the early project planning stage as the most critical in the consideration of TCs, the study results also identified “extra legal liability risk of the GB product” as the major concern for any GB developer in Hong Kong. The key additional activities that bring significant TCs in developing GB are identified and compared to their traditional counterparts. In turn, project managers not only have to pursue overall cost management whilst winning more business, but they also have to pay particular attention to sustainability in order to minimize hidden societal costs. The study also provides a reference for governments and professionals that will aid in forming policy as well as advance the practice of the GB market by optimizing the societal costs.

  2. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  3. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  4. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  5. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  6. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  7. Novel Front-end Electronics for Time Projection Chamber Detectors

    CERN Document Server

    García García, Eduardo José

    This work has been carried out in the European Organization for Nuclear Research (CERN) and it was supported by the European Union as part of the research and development towards the European detector the (EUDET) project, specifically for the International Linear Collider (ILC). In particle physics there are several different categories of particle detectors. The presented design is focused on a particular kind of tracking detector called Time Projection Chamber (TPC). The TPC provides a three dimensional image of electrically charged particles crossing a gaseous volume. The thesis includes a study of the requirements for future TPC detectors summarizing the parameters that the front-end readout electronics must fulfill. In addition, these requirements are compared with respect to the readouts used in existing TPC detectors. It is concluded that none of the existing front-end readout designs fulfill the stringent requirements. The main requirements for future TPC detectors are high integration, an increased n...

  8. Transmission avoided cost: a new parameter to evaluate the economic competitiveness of generations plants projects

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, D S [Companhia Energetica de Sao Paulo, SP (Brazil); Albuquerque, J C.R.; Rosenblat, J [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The paper presents a new formulation that makes feasible a composition of long run production marginal costs with the long run transmission marginal costs, including the costs related to the interconnection EHV networks and that related to the voltage levels below. The goal top be attained is to have available a more adequate parameter in order to compare production cost related to a plant, that will be connected to a certain voltage level network, to the cost related supplying the sam,e amount of energy from the bulk power system which will be represented by the marginal costs up to the voltage level under consideration. This procedure brings to light the Transmission Avoided Costs concepts, that are stressed throughout the text. The proposed methodology is now being used, in the brazilian Power Sector, as a rule of thumb in order to guide planning decisions about the schedule of new plants that have installed capacity below 30 MW. For plants with higher capacity, the transmission avoided costs are evaluated for each specific case, simulating the system behavior without the quoted hydroelectric plant. This paper focuses, an an application example, the case of the Canoas Hydroelectric Project, recently included in the Generation Expansion Reference Plan after a detailed analysis supported by the methodology described here. (author) 7 refs., 3 tabs.

  9. Direct Dark Matter Detection through the use of a Xenon Based TPC Detector

    Science.gov (United States)

    Daniel, Jonathan; Akerib, Daniel; LZ group at SLAC

    2018-01-01

    The vast majority of matter in the universe is unaccounted for. Only 15% of the universe's mass density is visible matter, while the other 85% is Dark Matter (DM). The Weakly Interacting Massive Particle (WIMP) is currently the frontrunner of the DM candidates. The Large Underground Xenon (LUX) and next generation LUX-ZEPLIN (LZ) experiments are designed to directly detect WIMPs. Both experiments are xenon-based Time Projection Chambers (TPC) used to observe possible WIMP interactions. These interactions produce photons and electrons with the photons being collected in a set of two photomultiplier tube (PMT) arrays and the electrons drifted upwards in the detector by a strong electric field to create a secondary production of photons in gaseous xenon. These two populations of photons are classified as S1 and S2 signals, respectively. Using these signals we reconstruct the energy and position of the interaction and in doing so we can eliminate background events that would otherwise “light up” the detector. My participation in the experiment, while at SLAC, was the creation of the grids that produce the large electric field, along with additional lab activities aimed at testing the grids. While at Stan State, I work on background modeling in order to distinguish a possible WIMP signal from ambient backgrounds.

  10. Electroluminescence pulse shape and electron diffusion in liquid argon measured in a dual-phase TPC

    Energy Technology Data Exchange (ETDEWEB)

    Agnes, P.; et al.

    2018-02-05

    We report the measurement of the longitudinal diffusion constant in liquid argon with the DarkSide-50 dual-phase time projection chamber. The measurement is performed at drift electric fields of 100 V/cm, 150 V/cm, and 200 V/cm using high statistics $^{39}$Ar decays from atmospheric argon. We derive an expression to describe the pulse shape of the electroluminescence signal (S2) in dual-phase TPCs. The derived S2 pulse shape is fit to events from the uppermost portion of the TPC in order to characterize the radial dependence of the signal. The results are provided as inputs to the measurement of the longitudinal diffusion constant DL, which we find to be (4.12 $\\pm$ 0.04) cm$^2$/s for a selection of 140keV electron recoil events in 200V/cm drift field and 2.8kV/cm extraction field. To study the systematics of our measurement we examine datasets of varying event energy, field strength, and detector volume yielding a weighted average value for the diffusion constant of (4.09 $\\pm$ 0.09) cm$^2$ /s. The measured longitudinal diffusion constant is observed to have an energy dependence, and within the studied energy range the result is systematically lower than other results in the literature.

  11. Developing Light Collection Enhancements and Wire Tensioning Methods for LArTPC Neutrino Detectors

    Energy Technology Data Exchange (ETDEWEB)

    Spagliardi, Fabio [Univ. of Manchester (United Kingdom)

    2017-01-01

    Liquid argon Time Projection Chambers (LArTPCs) are becoming widely used as neutrino detectors because of their image-like event reconstruction which enables precision neutrino measurements. They primarily use ionisation charge to reconstruct neutrino events. It has been shown, however, that the scintillation light emitted by liquid argon could be exploited to improve their performance. As the neutrino measurements planned in the near future require large-scale experiments, their construction presents challenges in terms of both charge and light collection. In this dissertation we present solutions developed to improve the performance in both aspects of these detectors. We present a new wire tensioning measurement method that allows a remote measurement of the tension of the large number wires that constitute the TPC anode. We also discuss the development and installation of WLS-compound covered foils for the SBND neutrino detector at Fermilab, which is a technique proposed t o augment light collection in LArTPCs. This included preparing a SBND-like mesh cathode and testing it in the Run III of LArIAT, a test beam detector also located at Fermilab. Finally, we present a study aimed at understanding late scintillation light emitted by recombining positive argon ions using LArIAT data, which could affect large scale surface detectors.

  12. Energy calibration of a GEM-TPC with Kr83m

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, Roman [Helmholtz-Institut fuer Strahlen- und Kernphysik, Universitaet Bonn (Germany); Collaboration: GEM-TPC-Collaboration

    2013-07-01

    A Time Projection Chamber (TPC) with Gas Electron Multiplier (GEM) readout has been developed with an inner/outer radius of 5/15 cm and a total drift length of 73 cm. It has been used as an inner tracking upgrade for the FOPI experiment at GSI and is planned as a future upgrade to the CBELSA/TAPS experiment. A radioactive {sup 83m}Kr source has been produced and integrated into the setup in order to perform an accurate channel-wise relative gain calibration and monitor gain stability to achieve optimal dE/dx resolution. Its gaseous form makes it perfectly suitable for this purpose allowing a full coverage of the readout plane and providing a wide energy range of conversion peaks. Also its half-life of 1.83 h allows for normal detector operation after a short flushing period of several hours. Calibration method and measured energy resolution for different gas mixtures which have been compared to simulation results are presented in this talk. Also first results on gain stability and pressure/temperature-dependence are shown.

  13. Characteristics of triple GEM detector for the ALICE TPC upgrade at CERN

    International Nuclear Information System (INIS)

    Patra, Rajendra Nath; Singaraju, R.N.; Ahammed, Z.; Nayak, T.K.; Viyogi, Y.P.; Biswas, S.

    2016-01-01

    Gas Electron Multiplier (GEM) detector, introduced by F. Sauliin 1997 and has been widely improved in last two decades for applications to high energy physics experiments and imaging. GEM detectors have several advantages, like good spatial resolution (∼100 μm), high detection efficiency (>98%), high rate handling capability (∼105 Hz/mm"2 ) and reasonable time response (∼5 ns). The unique features of the GEM detector make it suitable for experiments at Large Hadron Collider (LHC) at CERN and FAIR at GSI. With the increase of beam luminosity of LHC for its next phase of running from the year 2020, the ALICE experiment is planning to take data for PbPb collisions at a rate of 50 kHz. The ALICE Time Projection Chamber (TPC) will be upgraded by GEM based read-out to fulfil this future goal. In this report, results of a thorough test in the laboratory using a newly developed online data monitoring system are discussed

  14. Development and construction of a large TPC prototype for the ILC and study of τ polarisation in τ decays with the ILD detector

    International Nuclear Information System (INIS)

    Schade, Peter

    2009-11-01

    This thesis presents two studies which have been made in the framework of the detector development for the International Large Detector (ILD). In the preparation phase for the ILD, prototype studies are performed to develop and optimise the sub-detector technologies which will come into operation. Complementary to these hardware studies, expected physics scenarios are being investigated in full detector simulations. These simulations demonstrate the physics potential of the detector concept and are a benchmark for the detector and the accelerator design. The first part of this thesis gives an introduction to the physics questions addressed to the ILC. Also, the machine and the ILD detector concept are presented. The second part is dedicated to the development and the construction to a large Time Projection Chamber (TPC) prototype (LP). A TPC is foreseen as one of ILD's sub-detectors and shall measure the trajectories of charged particles with an accuracy unprecedented by TPCs operated before. The new prototype offers an infrastructure for the development of modern TPC readout structures which can fulfil the required criteria. Before construction, the design plans of the LP have been optimised for a low material budget of the structure and a very homogeneous drift field. During the manufacturing of the LP, experience with construction techniques has been gained for the construction of the ILD TPC. The third part deals with a simulation study for a polarisation measurement of τ leptons in the process e + e - → τ 1 τ 1 → χ 1 0 χ 1 0 ττ. Here, the τ 1 is the supersymmetric partner of the τ lepton. This simulation study shows the feasibility of the measurement in the chosen SUSY scenario and estimates the accuracy to be expected. Both studies address in particular the track reconstruction capabilities of the ILD detector. Conclusions of the discussed studies and an outlook are presented in part IV. (orig.)

  15. The cost-effectiveness of quality improvement projects: a conceptual framework, checklist and online tool for considering the costs and consequences of implementation-based quality improvement.

    Science.gov (United States)

    Thompson, Carl; Pulleyblank, Ryan; Parrott, Steve; Essex, Holly

    2016-02-01

    In resource constrained systems, decision makers should be concerned with the efficiency of implementing improvement techniques and technologies. Accordingly, they should consider both the costs and effectiveness of implementation as well as the cost-effectiveness of the innovation to be implemented. An approach to doing this effectively is encapsulated in the 'policy cost-effectiveness' approach. This paper outlines some of the theoretical and practical challenges to assessing policy cost-effectiveness (the cost-effectiveness of implementation projects). A checklist and associated (freely available) online application are also presented to help services develop more cost-effective implementation strategies. © 2015 John Wiley & Sons, Ltd.

  16. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  17. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  18. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  19. AN ENHANCED MODEL TO ESTIMATE EFFORT, PERFORMANCE AND COST OF THE SOFTWARE PROJECTS

    Directory of Open Access Journals (Sweden)

    M. Pauline

    2013-04-01

    Full Text Available The Authors have proposed a model that first captures the fundamentals of software metrics in the phase 1 consisting of three primitive primary software engineering metrics; they are person-months (PM, function-points (FP, and lines of code (LOC. The phase 2 consists of the proposed function point which is obtained by grouping the adjustment factors to simplify the process of adjustment and to ensure more consistency in the adjustments. In the proposed method fuzzy logic is used for quantifying the quality of requirements and is added as one of the adjustment factor, thus a fuzzy based approach for the Enhanced General System Characteristics to Estimate Effort of the Software Projects using productivity has been obtained. The phase 3 takes the calculated function point from our work and is given as input to the static single variable model (i.e. to the Intermediate COCOMO and COCOMO II for cost estimation. The Authors have tailored the cost factors in intermediate COCOMO and both; cost and scale factors are tailored in COCOMO II to suite to the individual development environment, which is very important for the accuracy of the cost estimates. The software performance indicators are project duration, schedule predictability, requirements completion ratio and post-release defect density, are also measured for the software projects in my work. A comparative study for effort, performance measurement and cost estimation of the software project is done between the existing model and the authors proposed work. Thus our work analyzes the interaction¬al process through which the estimation tasks were collectively accomplished.

  20. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  1. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  2. A review of the IEA/NEA Projected Costs of Electricity – 2015 edition

    International Nuclear Information System (INIS)

    Khatib, Hisham

    2016-01-01

    The IEA/NEA recently issued their eighth edition of the Study on the “Projected Costs of Generating Electricity” – 2015 edition. The Study is mainly concerned with calculating the levelised cost of electricity (LCOE). The LCOE calculations are based on a levelised average life time cost approach using the discounted cash flow (DCF) method. The analysis was this year, and for the first time, performed using three discount rates (3%, 7%, and 10%). The LCOE can serve as a tool for calculating the cost of different generation technologies. However the Study's usefulness is affected by its narrow base of a limited set of countries that are not necessarily representative. It ignored the negative role of subsidies and did not provide a methodology for selective application of the discount rates and costing of carbon. The global power generation scene is changing. Generation growth in OECD countries has become very limited; simultaneously there is rapid growth of varying renewables (VRE) generation which needs special criteria for assessing its system cost. All this demands a rethinking of the application and usefulness of the LCOE in future generation planning. - Highlights: • LCOE is a useful tool for economics of generation technologies. • The IEA/NEA study did not cover fully the required criteria for assessment. • It ignored interpretation of: the discount rate, carbon costing and subsidies. • The world energy scene is changing, this requires reassessment of LCOE.

  3. Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

    Science.gov (United States)

    Rosenberg, Leigh; Hihn, Jairus; Roust, Kevin; Warfield, Keith

    2000-01-01

    This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

  4. Development of a TPC for energy and fluence references in low energies neutronic fields (from 8 keV to 5 MeV)

    International Nuclear Information System (INIS)

    Maire, Donovan

    2015-01-01

    In order to judge the measurement reliability, metrology requires to measure quantities with their uncertainties, in relation to a reference through a documented and unbroken chain of calibrations. In neutron radiation field, instrument response has to be known as a function of the neutron energy. Then detector calibrations are required using reference neutron fields. In France, primary reference neutron fields are held by the LNE-IRSN, at the Laboratory for Neutron Metrology and Dosimetry (LMDN). In order to improve reference neutron field characterization, the LNE-IRSN MIMAC μTPC has been developed. This detector is a Time Projection Chamber (TPC), using a gas at low pressure (30 mbar abs. to 1 bar abs.). Nuclear recoils are generated by neutron elastic scattering onto gas atoms. By measuring the nuclear recoil energy and scattering angle, the μTPC detector is able to measure the energy distribution of the neutron fluence between 8 keV and 5 MeV. The main challenge was to perform accurate spectrometry of neutron fields in the keV range, following a primary procedure. First of all, a metrological approach was followed in order to master every physical process taking part in the neutron detection. This approach led to develop the direct and inverse models, representing the detector response function and its inverse function respectively. Using this detailed characterization, the energy distribution of the neutron fluence has been measured for a continuous neutron field of 27 keV. The reconstructed energy is 28,2 ± 4,5 keV, the difference between μTPC integral fluence measurement and other measurement methods is less than 6%. The LNE-IRSN MIMAC μTPC system becomes the only one system able to measure simultaneously energy and fluence at energies lower than 100 keV, following a primary procedure. The project goal is then reached. These measurements at energies lower than 100 keV shows also a non-linearity between the ionization charge and the ion kinetic energy

  5. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  6. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  7. Carbon Accounting and Cost Estimation in Forestry Projects Using CO2Fix V.3

    International Nuclear Information System (INIS)

    Groen, T.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is applied to four cases: (1) Joint implementation afforestation project in Romania, (2) Forest management project in Central Europe, (3) Reduced impact logging possibly under the Clean Development Mechanism (CDM) in the future, and (4) Afforestation with native species under the Clean Development Mechanism. The results show the wide applicability of CO2FIX, from degrading grasslands as baseline cases to multiple cohort forest ecosystems. Also the results show that Forest Management in the European case can generate considerable amounts of carbon emission reductions. Further, the results show that although reduced impact logging is not yet an allowed option under the Clean Development Mechanism, it shows promising results in that it is (1) very cost effective, (2) seems to be able to generate intermediate amounts of credits and (3) seems to us as a project type that is not prone to leakage issues. These results are yet another indication to seriously consider reduced impact logging as an eligible measure under the CDM

  8. Genetic algorithm for project time-cost optimization in fuzzy environment

    Directory of Open Access Journals (Sweden)

    Khan Md. Ariful Haque

    2012-12-01

    Full Text Available Purpose: The aim of this research is to develop a more realistic approach to solve project time-cost optimization problem under uncertain conditions, with fuzzy time periods. Design/methodology/approach: Deterministic models for time-cost optimization are never efficient considering various uncertainty factors. To make such problems realistic, triangular fuzzy numbers and the concept of a-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, Genetic Algorithm (GA has been used as a searching tool. Finally, Dev-C++ 4.9.9.2 has been used to code this solver. Findings: The solution has been performed under different combinations of GA parameters and after result analysis optimum values of those parameters have been found for the best solution. Research limitations/implications: For demonstration of the application of the developed algorithm, a project on new product (Pre-paid electric meter, a project under government finance launching has been chosen as a real case. The algorithm is developed under some assumptions. Practical implications: The proposed model leads decision makers to choose the desired solution under different risk levels. Originality/value: Reports reveal that project optimization problems have never been solved under multiple uncertainty conditions. Here, the function has been optimized using Genetic Algorithm search technique, with varied level of risks and fuzzy time periods.

  9. Project-based physics labs using low-cost open-source hardware

    Science.gov (United States)

    Bouquet, F.; Bobroff, J.; Fuchs-Gallezot, M.; Maurines, L.

    2017-03-01

    We describe a project-based physics lab, which we proposed to third-year university students. These labs are based on new open-source low-cost equipment (Arduino microcontrollers and compatible sensors). Students are given complete autonomy: they develop their own experimental setup and study the physics topic of their choice. The goal of these projects is to let students to discover the reality of experimental physics. Technical specifications of the acquisition material and case studies are presented for practical implementation in other universities.

  10. Cost Forecasting of Substation Projects Based on Cuckoo Search Algorithm and Support Vector Machines

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available Accurate prediction of substation project cost is helpful to improve the investment management and sustainability. It is also directly related to the economy of substation project. Ensemble Empirical Mode Decomposition (EEMD can decompose variables with non-stationary sequence signals into significant regularity and periodicity, which is helpful in improving the accuracy of prediction model. Adding the Gauss perturbation to the traditional Cuckoo Search (CS algorithm can improve the searching vigor and precision of CS algorithm. Thus, the parameters and kernel functions of Support Vector Machines (SVM model are optimized. By comparing the prediction results with other models, this model has higher prediction accuracy.

  11. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Dietz, Simon; Hepburn, Cameron

    2013-01-01

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  12. Examination of oil sands projects : gasification, CO{sub 2} emissions and supply costs

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, K. [Energy Resources Conservation Board, Calgary, AB (Canada)

    2008-10-15

    Non-conventional resources such as Alberta's oil sands are experiencing increased global interest because of the decline in global conventional oil and natural gas reserves. Bitumen extraction and upgrading is an energy intensive process. This paper provided a general discussion of Alberta's oil sands reserves, production and energy requirements. The paper discussed the application of different technologies to the oil sands, and in particular, the use of gasification as a method to produce bitumen-derived synthesis gas. Two oil sands projects currently under construction and implementing gasification technology were briefly described. The paper also provided a comparison of emission intensities from projects that employ gasification leading to a forecast of carbon dioxide equivalent emissions from the oil sands. The impact of Alberta's legislation and the federal framework on greenhouse gas emissions were also examined. Last, the paper discussed a supply cost methodology to compare an integrated extraction and upgrading project using gasification versus a similar project using a conventional steam methane reforming process (SMR). It was concluded that after comparing carbon dioxide emission intensities across different types of projects, the type of project that would be most heavily impacted by greenhouse gas emissions penalties was an in-situ extraction with an upgrading project that employed gasification technology. 36 refs., 5 tabs., 12 figs., 1 appendix.

  13. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  14. Projected hydrogen cost from methane reforming for North America 2015-2050

    International Nuclear Information System (INIS)

    Vanderveen, K.; Lutz, A.; Klebanoff, L.; Drennen, T.; Keller, J.; Drennen, T.; Kamery, W.

    2006-01-01

    The Hydrogen Futures Simulation Model (H 2 Sim) was used to project the cost for hydrogen at the point of sale to light duty vehicles for distributed, small-scale steam methane reforming. Projections cover the period from 2010-2050 in North America, and take into account assumptions about the quantity of recoverable natural gas remaining in North America. We conclude that there is a window for distributed reforming to play a positive role in supplying a H 2 fuel infrastructure, but this window is closing rapidly. The analysis assumes that production from natural gas reserves in North America will peak sometime before 2050 and demand will cause the price to rise after the peak of production in a manner consistent with Hotelling's model. We consider three scenarios for when the peak occurs, and evaluate the impact on the cost of hydrogen fuel produced via distributed small scale reforming in these three scenarios. (authors)

  15. A conceptual framework for the evaluation of cost-effectiveness of projects to reduce GHG emissions and sequester carbon

    International Nuclear Information System (INIS)

    Sathaye, J.; Norgaard, R.; Makundi, W.

    1993-07-01

    This paper proposes a conceptual framework for evaluating the cost of projects to reduce atmospheric greenhouse gases (GHGs). The evaluation of cost-effectiveness should account for both the timing of carbon emissions and the damage caused by the atmospheric stock of carbon. We develop a conceptual basis to estimate the cost-effectiveness of projects in terms of the cost of reducing atmospheric carbon (CRAC) and other GHGs. CRAC accounts for the economic discount rate, alternative functional forms of the shadow price, the residence period of carbon in the atmosphere, and the multiple monetary benefits of projects. The last item is of particular importance to the developing countries

  16. Frequent Change Request From User to Handle Cost on Project in Agile Model

    Directory of Open Access Journals (Sweden)

    Shariq Aziz Butt

    2017-05-01

    Full Text Available Agile has invented to improve and overcome Draw backs of software development. Now agile model is using in software development very vastly. It is facilitating the developer and client both very resourcefully. It is getting popularity than the other Software Development Life Cycle models because of its characteristics and most owing to allow change request at any level of the project. The client in the software development is the main part and asset of the company. The software house always focuses on its client because client is an asset. Thus developer has major concern with the client’s requirement and change request. Agile is getting popularity because of allow change request at any stage of project, on the other hand it is also a drawback in agile model because when project starts the project’s completion time and cost is decided. But due to frequent change of requests come from client the cost and completion time both increase eventually which is not good for software house’s business and reputation. So there is need a cost and time estimation technique to solve change request issue in agile model.

  17. New vaccines against otitis media: projected benefits and cost-effectiveness.

    Science.gov (United States)

    O'Brien, Megan A; Prosser, Lisa A; Paradise, Jack L; Ray, G Thomas; Kulldorff, Martin; Kurs-Lasky, Marcia; Hinrichsen, Virginia L; Mehta, Jyotsna; Colborn, D Kathleen; Lieu, Tracy A

    2009-06-01

    New vaccines that offer protection against otitis media caused by nontypeable Haemophilus influenzae and by Moraxella catarrhalis are under development. However, the potential health benefits and economic effects of such candidate vaccines have not been systematically assessed. We created a computerized model to compare the projected benefits and costs of (1) the currently available 7-valent pneumococcal conjugate vaccine, (2) a candidate pneumococcal-nontypeable H influenzae vaccine that has been tested in Europe, (3) a hypothetical pneumococcal-nontypeable H influenzae-Moraxella vaccine, and (4) no vaccination. The clinical probabilities of acute otitis media and of otitis media with effusion were generated from multivariate analyses of data from 2 large health maintenance organizations and from the Pittsburgh Child Development/Otitis Media Study cohort. Other probabilities, costs, and quality-of-life values were derived from published and unpublished sources. The base-case analysis assumed vaccine dose costs of $65 for the 7-valent pneumococcal conjugate vaccine, $100 for the pneumococcal-nontypeable H influenzae vaccine, and $125 for the pneumococcal-nontypeable H influenzae-Moraxella vaccine. With no vaccination, we projected that 13.7 million episodes of acute otitis media would occur annually in US children aged 0 to 4 years, at an annual cost of $3.8 billion. The 7-valent pneumococcal conjugate vaccine was projected to prevent 878,000 acute otitis media episodes, or 6.4% of those that would occur with no vaccination; the corresponding value for the pneumococcal-nontypeable H influenzae vaccine was 3.7 million (27%) and for the pneumococcal-nontypeable H influenzae-Moraxella vaccine was 4.2 million (31%). Using the base-case vaccine costs, pneumococcal-nontypeable H influenzae vaccine use would result in net savings compared with nontypeable 7-valent pneumococcal conjugate use. Conversely, pneumococcal-nontypeable H influenzae-Moraxella vaccine use would not

  18. Approaches in estimation of external cost for fuel cycles in the ExternE project

    International Nuclear Information System (INIS)

    Afanas'ev, A.A.; Maksimenko, B.N.

    1998-01-01

    The purposes, content and main results of studies realized within the frameworks of the International Project ExternE which is the first comprehensive attempt to develop general approach to estimation of external cost for different fuel cycles based on utilization of nuclear and fossil fuels, as well as on renewable power sources are discussed. The external cost of a fuel cycle is treated as social and environmental expenditures which are not taken into account by energy producers and consumers, i.e. these are expenditures not included into commercial cost nowadays. The conclusion on applicability of the approach suggested for estimation of population health hazards and environmental impacts connected with electric power generation growth (expressed in money or some other form) is made

  19. SECON - A tool for estimation of storage costs and storage project revenue

    International Nuclear Information System (INIS)

    Hall, O.

    1997-01-01

    The SECON model Storage ECONomics is useful for gas suppliers, storage operators, gas distributors and consumers when investigating new storage possibilities. SECON has been used within the Sydkraft group to compare cost for different types of storage and to identify the market niche for lined rock cavern (LRC) storage. In the model cost for the different storage types, salt caverns, LNG, and LRC can be compared. By using input according to market needs each storage type can be validated for a specific service e.g. peak shaving, seasonal storage or balancing. The project revenue can also be calculated. SECON includes three models for income calculation; US storage service, Trading and Avoided Supply Contract Costs. The income models calculates annual turnover, pay of time, net present value, internal rate of return and max. liquidity shortfall for the project. The SECON will facilitate sensitivity analysis both regarding cost for different services and different storage types and on the income side by using different scenarios. At the poster session SECON will be presented live and the delegates will have the opportunity to test the model. (au)

  20. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    Science.gov (United States)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  1. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    International Nuclear Information System (INIS)

    Dunford, Gary; Williams, David; Smith, Rick

    2013-01-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  2. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    Energy Technology Data Exchange (ETDEWEB)

    Dunford, Gary [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States); Williams, David [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States); Smith, Rick [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)

    2013-07-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  3. TPC cross-talk correction: CERN-Dubna-Milano algorithm and results

    CERN Document Server

    De Min, A; Guskov, A; Krasnoperov, A; Nefedov, Y; Zhemchugov, A

    2003-01-01

    The CDM (CERN-Dubna-Milano) algorithm for TPC Xtalk correction is presented and discussed in detail. It is a data-driven, model-independent approach to the problem of Xtalk correction. It accounts for arbitrary amplitudes and pulse shapes of signals, and corrects (almost) all generations of Xtalk, with a view to handling (almost) correctly even complex multi-track events. Results on preamp amplification and preamp linearity from the analysis of test-charge injection data of all six TPC sectors are presented. The minimal expected error on the measurement of signal charges in the TPC is discussed. Results are given on the application of the CDM Xtalk correction to test-charge events and krypton events.

  4. Dysregulation of lysosomal morphology by pathogenic LRRK2 is corrected by TPC2 inhibition.

    Science.gov (United States)

    Hockey, Leanne N; Kilpatrick, Bethan S; Eden, Emily R; Lin-Moshier, Yaping; Brailoiu, G Cristina; Brailoiu, Eugen; Futter, Clare E; Schapira, Anthony H; Marchant, Jonathan S; Patel, Sandip

    2015-01-15

    Two-pore channels (TPCs) are endolysosomal ion channels implicated in Ca(2+) signalling from acidic organelles. The relevance of these ubiquitous proteins for human disease, however, is unclear. Here, we report that lysosomes are enlarged and aggregated in fibroblasts from Parkinson disease patients with the common G2019S mutation in LRRK2. Defects were corrected by molecular silencing of TPC2, pharmacological inhibition of TPC regulators [Rab7, NAADP and PtdIns(3,5)P2] and buffering local Ca(2+) increases. NAADP-evoked Ca(2+) signals were exaggerated in diseased cells. TPC2 is thus a potential drug target within a pathogenic LRRK2 cascade that disrupts Ca(2+)-dependent trafficking in Parkinson disease. © 2015. Published by The Company of Biologists Ltd.

  5. TPC track distortions: correction maps for magnetic and static electric inhomogeneities

    CERN Document Server

    Dydak, F; Nefedov, Y

    2003-01-01

    Inhomogeneities of the magnetic and electric fields in the active TPC volume lead to displacements of cluster coordinates, and therefore to track distortions. In case of good data taking conditions, the largest effects are expected from the inhomogeneity of the solenoidal magnetic field, and from a distortion of the electric field arising from a high voltage misalignment between the outer and inner field cages. Both effects are stable over the entire HARP data taking. The displacements are large compared to the azimuthal coordinate resolution but can be corrected with sufficient precision, except at small TPC radius. The high voltage misalignment between the outer and inner field cages is identified as the likely primary cause of sagitta distortions of TPC tracks. The position and the length of the target plays an important role. Based on a detailed modelling of the magnetic and static electric field inhomogeneities, precise correction maps for both effects have been calculated. Predictions from the correctio...

  6. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  7. Report on Fission Time Projection Chamber M3FT-12IN0210052

    Energy Technology Data Exchange (ETDEWEB)

    James K. Jewell

    2012-08-01

    The Time Projection Chamber is a collaborative effort to implement an innovative approach and deliver unprecedented fission measurements to DOE programs. This 4?-detector system will provide unrivaled 3-D data about the fission process. Shown here is a half populated TPC (2?) at the LLNL TPC laboratory as it undergoes testing before being shipped to LANSCE for beam experiments.

  8. Peach Bottom Turbine Trip Simulations with RETRAN Using INER/TPC BWR Transient Analysis Method

    International Nuclear Information System (INIS)

    Kao Lainsu; Chiang, Show-Chyuan

    2005-01-01

    The work described in this paper is benchmark calculations of pressurization transient turbine trip tests performed at the Peach Bottom boiling water reactor (BWR). It is part of an overall effort in providing qualification basis for the INER/TPC BWR transient analysis method developed for the Kuosheng and Chinshan plants. The method primarily utilizes an advanced system thermal hydraulics code, RETRAN02/MOD5, for transient safety analyses. Since pressurization transients would result in a strong coupling effect between core neutronic and system thermal hydraulics responses, the INER/TPC method employs the one-dimensional kinetic model in RETRAN with a cross-section data library generated by the Studsvik-CMS code package for the transient calculations. The Peach Bottom Turbine Trip (PBTT) tests, including TT1, TT2, and TT3, have been successfully performed in the plant and assigned as standards commonly for licensing method qualifications for years. It is an essential requirement for licensing purposes to verify integral capabilities and accuracies of the codes and models of the INER/TPC method in simulating such pressurization transients. Specific Peach Bottom plant models, including both neutronics and thermal hydraulics, are developed using modeling approaches and experiences generally adopted in the INER/TPC method. Important model assumptions in RETRAN for the PBTT test simulations are described in this paper. Simulation calculations are performed with best-estimated initial and boundary conditions obtained from plant test measurements. The calculation results presented in this paper demonstrate that the INER/TPC method is capable of calculating accurately the core and system transient behaviors of the tests. Excellent agreement, both in trends and magnitudes between the RETRAN calculation results and the PBTT measurements, shows reliable qualifications of the codes/users/models involved in the method. The RETRAN calculated peak neutron fluxes of the PBTT

  9. Assessment of external costs for transport project evaluation: Guidelines in some European countries

    Energy Technology Data Exchange (ETDEWEB)

    Petruccelli, Umberto, E-mail: umberto.petruccelli@unibas.it

    2015-09-15

    Many studies about the external costs generated by the transport system have been developed in the last twenty years. To standardize methodologies and assessment procedures to be used in the evaluation of the projects, some European countries recently have adopted specific guidelines that differ from each other in some aspects even sensibly. This paper presents a critical analysis of the British, Italian and German guidelines and is aimed at cataloguing the external cost types regarded and the assessment methods indicated as well as to highlight the differences of the results, in terms of applicability and reliability. The goal is to contribute to a European standardization process that would lead to the drafting of guidelines suited for all EU countries. - Highlights: • The analyzed guidelines agree on the methods to evaluate costs from air pollution, greenhouse gases and accidents. • They recommend respectively: dose-resp. approach; costs to reduce/permit emissions; whole direct, indirect and social costs. • For noise, DE guide indicates defensive expenditure or SP methods; IT guide, SP method; UK guide, the hedonic prices one. • For on territory impact, DE guide regards only the barrier effect; the IT one, also the soil consumption and system effects. • British guide proposes a qualitative methodology to estimate the impact on various landscapes and environments.

  10. Contribution of a Liquid Argon TPC to T2K Neutrino Experiment

    Science.gov (United States)

    Meregaglia, A.; Rubbia, A.

    2006-08-01

    A 2 km LAr detector would be an important asset for the T2K experiment. Different physics scenarios are considered and for each one the role of a LAr TPC in enhancing the ultimate sensitivity on theta 13 is studied. The large sample of neutrino interactions in the GeV region would provide crucial information for the study of different types of reactions and of nuclear effects, whereas the inner target would give a direct measurement of the cross sections ratio between Water and Argon. Such a detector would also be an important milestone for the LAr TPC technique providing an extremely valuable experience for future large LAr detectors.

  11. Solid-Liquid Extraction Kinetics of Total Phenolic Compounds (TPC from Red Dates

    Directory of Open Access Journals (Sweden)

    Bee Lin Chua

    2018-01-01

    Full Text Available Red dates are one of the most famous herbal plants in making traditional Chinese medicine. They contain large amount of bioactive compounds. The objectives of this research were to optimise the crude extract yield and total phenolic compounds (TPC yield from red dates using response surface methodology (RSM and model the extraction kinetics of TPC yield from red dates. Date fruits were dried in an oven under temperatures 50°C, 60°C, 70°C and 80°C until a constant weight was obtained. The optimum drying temperature was 60°C as it gave the highest crude extract yield and TPC yield. Besides that, single factor experiments were used to determine the optimum range of four extraction parameters which were: liquid-solid ratio (10-30 ml/g; ultrasonic power (70-90%; extraction temperature (50-70°C; and extraction time (40-60min. The optimum range of the four parameters were further optimised using the Box-Behken Design (BBD of RSM. The extraction conditions that gave the highest crude extract yield and TPC yield were chosen. The optimum value for liquid-solid ratio, ultrasonic power, extraction temperature and extraction time were 30ml/g, 70%, 60°C and 60 min respectively. The two equations generated from RSM were reliable and can be used to predict the crude extract yield and TPC yield. The higher the extraction temperature, liquid-solid ratio, and extraction time and lower ultrasonic power, the higher the crude extract and TPC yield. Finally, the results of TPC yield versus time based on the optimum extraction parameters from RSM optimisation were fitted into three extraction kinetic models (Peleg’s model, Page’s model and Ponomaryov’s model. It was found that the most suitable kinetic model to represent the extraction process of TPC from red dates was Page’s model due to its coefficient of determination (R2 was the closest to unity, 0.9663 while its root mean square error (RMSE was the closest to zero, 0.001534.

  12. Water data: bad TPC pads, 3.6 µs and 100 ns problems

    CERN Document Server

    Dydak, F; Nefedov, Y; Wotschack, J; Zhemchugov, A

    2004-01-01

    Out of the 3972 pads of the HARP TPC, about 9% are 'bad' and not useful for the correct reconstruction of clusters. Bad pads comprise dead pads, noisy pads, and pads with low or undefined amplification. Pads may be bad at one time, but not at another. This memo discusses the sources of information which were used to declare a pad 'bad', and gives the list of bad pads for the water data (runs 19146 to 19301). Also, the 3.6 µs and 100 ns problems of the TPC readout are discussed, including the corrective measures which have been taken.

  13. Lifetime cost effectiveness of a through-school nutrition and physical programme: Project Energize.

    Science.gov (United States)

    Rush, Elaine; Obolonkin, Victor; McLennan, Stephanie; Graham, David; Harris, James D; Mernagh, Paul; Weston, Adéle R

    2014-01-01

    Project Energize, a multicomponent through-school physical activity and nutrition programme, is delivered to all primary school children in the Waikato region. The programme aim is to improve the overall health and reduce the rate of weight gain of all Waikato primary school children. An existing economic model was used to extrapolate the programme effects, initial costs, lifetime health treatment cost structures, quality-adjusted-life-years gained and increased life expectancy to the general and Māori child population of New Zealand. In March 2011, a sample of 2474 younger (7.58 ± 0.57 years, mean ± SD) and 2330 older (10.30 ± 0.51 years) children (36% Māori) attending Energize schools had body mass index measured and compared using mixed effect modelling with unEnergized comparison children from 2004 and 2006 from the same region. In 2011 the median body mass index reduction compared with the comparison younger children was -0.504 (90% CI -0.435 to -0.663) kg/m(2) and in the older children -0.551 (-0.456 to -0.789) kg/m(2). In 2010 there were 42,067 children attending Energize schools and in the same year NZ$1,891,175 was spent to deliver the programme; a cost of $44.96/child/year. Compared to the comparison children the increment in cost/quality-adjusted-life-year gained was $30,438 for the younger and $24,690 for the older children, and lower for Māori (younger $28,241, older $22,151) and for the middle socioeconomic status schools ($23,211, $17,891). Project Energize would improve quality and length of life and when compared with other obesity prevention programmes previously assessed with this model, it would be relatively cost-effective from the health treatment payer's perspective.

  14. The cost and value of pre-registration clinical placements for Project 2000 students.

    Science.gov (United States)

    Jones, M L; Akehurst, R

    1999-07-01

    The research outlined in this article was commissioned by the Sheffield and North Trent College of Nursing and Midwifery to explore the cost implications of pre-registration clinical placements in the context of Project 2000. The authors outline the methodology and findings of an exercise designed to collect relevant cost information which was not readily available. On the basis of these findings, they suggest that: at 1995/1996 pay and prices, clinical placements cost the education provider approximately pound 890 per student per annum; in terms of real resources, the value to service providers of the service contribution made by second- and third-year nursing and midwifery students on ward-based placements outweighs the value of the time spent by qualified staff on their supervision and education. Once the funding assumptions underlying the introduction of Project 2000 have been taken into account, second- and third-year nursing and midwifery students benefit the service provider by on average pound 3.46 for every hour they spend in an unrostered ward-based placement. The service contribution made by students in community-based clinical placements cannot free staff time in the same way as on the wards and, because qualified staff in these areas are generally more highly graded, the value of the time they spend on the supervision and education of students on placement is higher than in ward-based placements. Second- and third-year students therefore appear to cost the service provider on average pound 0.48 for each hour they spend in a community-based placement. It was not possible to determine whether this cost translates into a reduction in patient contacts.

  15. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  16. An integrated framework for cost- benefit analysis in road safety projects using AHP method

    Directory of Open Access Journals (Sweden)

    Mahsa Mohamadian

    2011-10-01

    Full Text Available Cost benefit analysis (CBA is a useful tool for investment decision-making from economic point of view. When the decision involves conflicting goals, the multi-attribute analysis approach is more capable; because there are some social and environmental criteria that cannot be valued or monetized by cost benefit analysis. The complex nature of decision-making in road safety normally makes it difficult to reach a single alternative solution that can satisfy all decision-making problems. Generally, the application of multi-attribute analysis in road sector is promising; however, the applications are in preliminary stage. Some multi-attribute analysis techniques, such as analytic hierarchy process (AHP have been widely used in practice. This paper presents an integrated framework with CBA and AHP methods to select proper alternative in road safety projects. The proposed model of this paper is implemented for a case study of improving a road to reduce the accidents in Iran. The framework is used as an aid to cost benefit tool in road safety projects.

  17. Long-term care cost drivers and expenditure projection to 2036 in Hong Kong

    Directory of Open Access Journals (Sweden)

    Chan Wai

    2009-09-01

    Full Text Available Abstract Background Hong Kong's rapidly ageing population, characterised by one of the longest life expectancies and the lowest fertility rate in the world, is likely to drive long-term care (LTC expenditure higher. This study aims to identify key cost drivers and derive quantitative estimates of Hong Kong's LTC expenditure to 2036. Methods We parameterised a macro actuarial simulation with data from official demographic projections, Thematic Household Survey 2004, Hong Kong's Domestic Health Accounts and other routine data from relevant government departments, Hospital Authority and other LTC service providers. Base case results were tested against a wide range of sensitivity assumptions. Results Total projected LTC expenditure as a proportion of GDP reflected secular trends in the elderly dependency ratio, showing a shallow dip between 2004 and 2011, but thereafter yielding a monotonic rise to reach 3.0% by 2036. Demographic changes would have a larger impact than changes in unit costs on overall spending. Different sensitivity scenarios resulted in a wide range of spending estimates from 2.2% to 4.9% of GDP. The availability of informal care and the setting of formal care as well as associated unit costs were important drivers of expenditure. Conclusion The "demographic window" between the present and 2011 is critical in developing policies to cope with the anticipated burgeoning LTC burden, in concert with the related issues of health care financing and retirement planning.

  18. Opportunities for low-cost CO2 storage demonstration projects in China

    International Nuclear Information System (INIS)

    Meng, Kyle C.; Williams, Robert H.; Celia, Michael A.

    2007-01-01

    Several CO 2 storage demonstration projects are needed in a variety of geological formations worldwide to prove the viability of CO 2 capture and storage as a major option for climate change mitigation. China has several low-cost CO 2 sources at sites that produce NH 3 from coal via gasification. At these plants, CO 2 generated in excess of the amount needed for other purposes (e.g., urea synthesis) is vented as a relatively pure stream. These CO 2 sources would potentially be economically interesting candidates for storage demonstration projects if there are suitable storage sites nearby. In this study a survey was conducted to estimate CO 2 availability at modern Chinese coal-fed ammonia plants. Results indicate that annual quantities of available, relatively pure CO 2 per site range from 0.6 to 1.1 million tonnes. The CO 2 source assessment was complemented by analysis of possible nearby opportunities for CO 2 storage. CO 2 sources were mapped in relation to China's petroliferous sedimentary basins where prospective CO 2 storage reservoirs possibly exist. Four promising pairs of sources and sinks were identified. Project costs for storage in deep saline aquifers were estimated for each pairing ranging from $15-21/t of CO 2 . Potential enhanced oil recovery and enhanced coal bed methane recovery opportunities near each prospective source were also considered

  19. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  20. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    Science.gov (United States)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  1. Array automated assembly task low cost silicon solar array project. Phase 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Clayton

    1980-12-01

    The initial contract was a Phase II Process Development for a process sequence, but with concentration on two particular process steps: laserscribing and spray-on junction formation. The add-on portion of the contract was to further develop these tasks, to incorporate spray-on of AR Coating and aluminum and to study the application of microwave energy to solar cell fabrication. The overall process cost projection is 97.918 cents/Wp. The major contributor to this excess cost is the module encapsulation materials cost. During the span of this contract the study of microwave application to solar cell fabrication produced the ability to apply this technique to any requirement of 600/sup 0/C or less. Above this temperature, non-uniformity caused the processing to be unreliable. The process sequence is described in detail, and a SAMICS cost analysis for each valid process step studied is presented. A temporary catalog for expense items is included, and engineering specifications for the process steps are given. (WHK)

  2. COST OF TAX COMPLIANCE AND RISK MANAGEMENT IN PROJECTS: THE CASE STUDY OF A SMALL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2010-06-01

    Full Text Available This study uses a risk management perspective to analyze compliance costs arising from overlapping service tax (ST jurisdictions. We study the case of an engineering company providing services to the Companhia de Saneamento Básico do Estado de São Paulo [São Paulo State Sanitation Company] – SABESP, a public entity. The engineering company was contracted under public law 8.666/93, to provide engineering service in several townships in São Paulo’s metropolitan area. Because the laws governing bidding do not permit later modification in price or provider, subsequent double taxation by one municipality cut into the firm’s margins, and should other local governments follow suit, multiple taxation would render the contract untenable for the provider. Our paper models the impact of conflicting jurisdictions on administrative burden, psychological costs and profit constriction and discusses project management techniques for decision making and management in similar situations.

  3. Cost-benefit analysis of copper recovery in remediation projects: A case study from Sweden.

    Science.gov (United States)

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Karlfeldt Fedje, Karin

    2017-12-15

    Contamination resulting from past industrial activity is a problem throughout the world and many sites are severely contaminated by metals. Advances in research in recent years have resulted in the development of technologies for recovering metal from metal-rich materials within the framework of remediation projects. Using cost-benefit analysis (CBA), and explicitly taking uncertainties into account, this paper evaluates the potential social profitability of copper recovery as part of four remediation alternatives at a Swedish site. One alternative involves delivery of copper-rich ash to a metal production company for refining. The other three alternatives involve metal leaching from materials and sale of the resulting metal sludge for its further processing at a metal production company using metallurgical methods. All the alternatives are evaluated relative to the conventional excavation and disposal method. Metal recovery from the ash, metal sludge sale, and disposal of the contaminated soil and the ash residue at the local landfill site, was found to be the best remediation alternative. However, given the present conditions, its economic potential is low relative to the conventional excavation and disposal method but higher than direct disposal of the copper-rich ash for refining. Volatile copper prices, the high cost of processing equipment, the highly uncertain cost of the metal leaching and washing process, coupled with the substantial project risks, contribute most to the uncertainties in the CBA results for the alternatives involving metal leaching prior to refining. However, investment in processing equipment within the framework of a long-term investment project, production of safe, reusable soil residue, and higher copper prices on the metal market, can make metal recovery technology socially profitable. Copyright © 2017 Elsevier B.V. All rights reserved.

  4. Neutron Fluence and Energy Reconstruction with the LNE-IRSN/MIMAC Recoil Detector MicroTPC at 27 keV

    Energy Technology Data Exchange (ETDEWEB)

    Maire, D.; Lebreton, L.; Querre, Ph. [Institute for Radioprotection and Nuclear Safety - IRSN, site of Cadarache, 13115 Saint Paul lez Durance (France); Bosson, G.; Guillaudin, O.; Muraz, J.F.; Riffard, Q.; Santos, D. [Laboratoire de Physique Subatomique et de Cosmologie - LPSCCNRSIN2P3/ UJF/INP, 38000 Grenoble (France)

    2015-07-01

    The French Institute for Radiation protection and Nuclear Safety (IRSN), designated by the French Metrology Institute (LNE) for neutron metrology, is developing a time projection chamber using a Micromegas anode: microTPC. This work is carried out in collaboration with the Laboratory of Subatomic Physics and Cosmology (LPSC). The aim is to characterize the energy distribution of neutron fluence in the energy range 8 keV - 5 MeV with a primary procedure. The time projection chambers are gaseous detectors able to measure charged particles energy and to reconstruct their track if a pixelated anode is used. In our case, the gas is used as a (n, p) converter in order to detect neutrons down to few keV. Coming from elastic collisions with neutrons, recoil protons lose a part of their kinetic energy by ionizing the gas. The ionization electrons are drifted toward a pixelated anode (2D projection), read at 50 MHz by a self-triggered electronic system to obtain the third track dimension. The neutron energy is reconstructed event by event thanks to proton scattering angle and proton energy measurements. The scattering angle is deduced from the 3D track. The proton energy is obtained by charge collection measurements, knowing the ionization quenching factor (i.e. the part of proton kinetic energy lost by ionizing the gas). The fluence is calculated thanks to the detected events number and the simulation of the detector response. The μTPC is a new reliable detector able to measure energy distribution of the neutron fluence without unfolding procedure or prior neutron calibration contrary to usual gaseous counters. The microTPC is still being developed and measurements have been carried out at the AMANDE facility, with neutrons energies going from 8 keV to 565 keV. After the context and the μ-TPC working principle presentation, measurements of the neutron energy and fluence at 27 keV and 144 keV are shown and compared to the complete detector response simulation. This work

  5. Neutron fluence and energy reconstruction with the IRSN recoil detector μ-TPC at 27 keV, 144 keV and 565 keV

    Energy Technology Data Exchange (ETDEWEB)

    Maire, D.; Lebreton, L.; Richer, J.P. [IRSN, PRP-HOM, SDE, LMDN, 13115 Saint Paul-Lez-Durance (France); Bosson, G.; Bourrion, O.; Guillaudin, O.; Riffard, Q.; Santos, D. [CNRS/IN2P3-UJF-INPG, LPSC, 38000 Grenoble (France)

    2015-07-01

    The French Institute for Radioprotection and Nuclear Safety (IRSN), associated to the French Metrology Institute (LNE), is developing a time projection chamber using a Micromegas anode: μ-TPC. This work is carried out in collaboration with the Laboratory of Subatomic Physics and Cosmology (LPSC). The aim is to characterize with a primary procedure the energy distribution of neutron fluence in the energy range 8 keV - 1 MeV. The time projection chambers are gaseous detectors, which are able to measure charged particles energy and to reconstruct their track if a pixelated anode is used. In our case, the gas is used as a (n, p) converter in order to detect neutrons down to few keV. Coming from elastic collisions with neutrons, recoil protons lose a part of their kinetic energy by ionizing the gas. The ionization electrons are drifted toward a pixelated anode (2D projection), read at 50 MHz by a self-triggered electronic system to obtain the third track dimension. The neutron energy is reconstructed event by event thanks to proton scattering angle and proton energy measurements. The scattering angle is deduced from the 3D track. The proton energy is obtained by charge collection measurements, knowing the ionization quenching factor (i.e. the part of proton kinetic energy lost by ionizing the gas). The fluence is calculated thanks to the detected events number and the simulated detector response. The μ-TPC is a new reliable detector which enables to measure energy distribution of the neutron fluence without deconvolution or neutron calibration contrary to usual gaseous counters. The μ-TPC is still being developed and measurements have been carried out at the AMANDE facility, with neutrons energies going from 8 keV to 565 keV. After the context and the μ-TPC working principle presentation, measurements of the neutron energy and fluence at 27.2 keV, 144 keV and 565 keV are shown and compared to the complete detector simulation. This work shows the first direct

  6. (abstract) Science-Project Interaction in the Low-Cost Mission

    Science.gov (United States)

    Wall, Stephen D.

    1994-01-01

    Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

  7. A learning curve approach to projecting cost and performance for photovoltaic technologies

    Science.gov (United States)

    Cody, George D.; Tiedje, Thomas

    1997-04-01

    The current cost of electricity generated by PV power is still extremely high with respect to power supplied by the utility grid, and there remain questions as to whether PV power can ever be competitive with electricity generated by fossil fuels. An objective approach to this important question was given in a previous paper by the authors which introduced analytical tools to define and project the technical/economic status of PV power from 1988 through the year 2010. In this paper, we apply these same tools to update the conclusions of our earlier study in the context of recent announcements by Amoco/Enron-Solarex of projected sales of PV power at rates significantly less than the US utility average.

  8. Learning curve approach to projecting cost and performance for photovoltaic technologies

    Science.gov (United States)

    Cody, George D.; Tiedje, Thomas

    1997-10-01

    The current cost of electricity generated by PV power is still extremely high with respect to power supplied by the utility grid, and there remain questions as to whether PV power can ever be competitive with electricity generated by fossil fuels. An objective approach to this important question was given in a previous paper by the authors which introduced analytical tools to define and project the technical/economic status of PV power from 1988 through the year 2010. In this paper, we apply these same tools to update the conclusions of our earlier study in the context of recent announcements by Amoco/Enron-Solar of projected sales of PV power at rates significantly less than the U.S. utility average.

  9. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  10. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  11. Minnesota wood energy scale-up project 1994 establishment cost data

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M. [Oak Ridge National Lab., TN (United States); Pierce, R. [Champion International, Alexandria, MN (United States); Kroll, T. [Minnesota Department of Natural Resources-Forestry, St. Cloud, MN (United States)

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. These extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.

  12. Externality costing for hydroelectric projects: Is it desirable? Is it possible?

    International Nuclear Information System (INIS)

    Bernier, L.

    1992-01-01

    The assignment of monetary values to environmental and social impacts of hydroelectric projects is discussed. The strengths and weaknesses of the economic approach to externality costing are noted. The problem to be faced is that environmental externalities associated with a hydro project very often involve resources that have little or no relation with the market, such as disturbances of land not used for commercial activities. The valuation of externalities related to thermal power plants is examined to provide lessons for quantifying the externalities of hydro projects. One observation is that there is very little information on the real impacts of such phenomena as the release of greenhouse gases, making quantification of their effect difficult; another is that impacts from atmospheric emissions are well in excess of simple deterioration of material goods or recreational activities that have some relationship to the market. Applied to hydro projects, the lessons from these observations indicate that there are no exact and homogeneous measurement units for impacts of actions such as diking or alteration of wildlife habitats. One approach that has been tried is the contingent valuation method, which relies on asking respondents how much they would pay to avoid an impact or risk. This approach is criticized and it is suggested to experiment with a review of the tradeoffs between several possible environmental impacts defined in a precise manner

  13. Study of electron recombination in liquid argon with the ICARUS TPC

    International Nuclear Information System (INIS)

    Amoruso, S.; Antonello, M.; Aprili, P.; Arneodo, F.; Badertscher, A.; Baiboussinov, B.; Baldo Ceolin, M.; Battistoni, G.; Bekman, B.; Benetti, P.; Bischofberger, M.; Borio di Tigliole, A.; Brunetti, R.; Bruzzese, R.; Bueno, A.; Buzzanca, M.; Calligarich, E.; Campanelli, M.; Carbonara, F.; Carpanese, C.; Cavalli, D.; Cavanna, F.; Cennini, P.; Centro, S.; Cesana, A.; Chen, C.; Chen, D.; Chen, D.B.; Chen, Y.; Cieslik, K.; Cline, D.; Cocco, A.G.; Dai, Z.; De Vecchi, C.; Dabrowska, A.; Di Cicco, A.; Dolfini, R.; Ereditato, A.; Felcini, M.; Ferrari, A.; Ferri, F.; Fiorillo, G.; Galli, S.; Ge, Y.; Gibin, D.; Gigli Berzolari, A.; Gil-Botella, I.; Graczyk, K.; Grandi, L.; Guglielmi, A.; He, K.; Holeczek, J.; Huang, X.; Juszczak, C.; Kielczewska, D.; Kisiel, J.; Kozlowski, T.; Laffranchi, M.; Lagoda, J.; Li, Z.; Lu, F.; Ma, J.; Mangano, G.; Markiewicz, M.; Martinez de la Ossa, A.; Matthey, C.; Mauri, F.; Meng, G.; Messina, M.; Montanari, C.; Muraro, S.; Navas-Concha, S.; Otwinowski, S.; Ouyang, Q.; Palamara, O.; Pascoli, D.; Periale, L.; Piano Mortari, G.B.; Piazzoli, A.; Picchi, P.; Pietropaolo, F.; Polopek, W.; Rancati, T.; Rappoldi, A.; Raselli, G.L.; Rico, J.; Rondio, E.; Rossella, M.; Rubbia, A.; Rubbia, C.; Sala, P.R.; Santorelli, R.; Scannicchio, D.; Segreto, E.; Seo, Y.; Sergiampietri, F.; Sobczyk, J.; Spinelli, N.; Stepaniak, J.; Sulej, R.; Szarska, M.; Szeptycka, M.; Terrani, M.; Velotta, R.; Ventura, S.; Vignoli, C.; Wang, H.; Wang, X.; Woo, J.; Xu, G.; Xu, Z.; Zalewska, A.; Zhang, C.; Zhang, Q.; Zhen, S.; Zipper, W.

    2004-01-01

    Electron recombination in liquid argon (LAr) is studied by means of charged particle tracks collected in various ICARUS liquid argon TPC prototypes. The dependence of the recombination on the particle stopping power has been fitted with a Birks functional dependence. The simulation of the process of electron recombination in Monte Carlo calculations is discussed. A quantitative comparison with previously published data is carried out

  14. Front-end electronics and readout system for the ILD TPC

    CERN Document Server

    Hedberg, V; Lundberg, B; Mjörnmark, U; Oskarsson, A; Österman, L; De Lentdecker, G; Yang, Y; Zhang, F

    2015-01-01

    A high resolution TPC is the main option for a central tracking detector at the future International Linear Collider (ILC). It is planned that the MPGD (Micro Pattern Gas Detector) technology will be used for the readout. A Large Prototype TPC at DESY has been used to test the performance of MPGDs in an electron beam of energies up to 6 GeV. The first step in the technology development was to demonstrate that the MPGDs are able to achieve the necessary performance set by the goals of ILC. For this ’proof of principle’ phase, the ALTRO front-end electronics from the ALICE TPC was used, modified to adapt to MPGD readout. The proof of principle has been verified and at present further improvement of the MPGD technology is going on, using the same readout electronics. The next step is the ’feasibility phase’, which aims at producing front-end electronics comparable in size (few mm2) to the readout pads of the TPC. This development work is based on the succeeding SALTRO16 chip, which combines the analogue ...

  15. Tokamak plasma power balance calculation code (TPC code) outline and operation manual

    International Nuclear Information System (INIS)

    Fujieda, Hirobumi; Murakami, Yoshiki; Sugihara, Masayoshi.

    1992-11-01

    This report is a detailed description on the TPC code, that calculates the power balance of a tokamak plasma according to the ITER guidelines. The TPC code works on a personal computer (Macintosh or J-3100/ IBM-PC). Using input data such as the plasma shape, toroidal magnetic field, plasma current, electron temperature, electron density, impurities and heating power, TPC code can determine the operation point of the fusion reactor (Ion temperature is assumed to be equal to the electron temperature). Supplied flux (Volt · sec) and burn time are also estimated by coil design parameters. Calculated energy confinement time is compared with various L-mode scaling laws and the confinement enhancement factor (H-factor) is evaluated. Divertor heat load is predicted by using simple scaling models (constant-χ, Bohm-type-χ and JT-60U empirical scaling models). Frequently used data can be stored in a 'device file' and used as the default values. TPC code can generate 2-D mesh data and the POPCON plot is drawn by a contour line plotting program (CONPLT). The operation manual about CONPLT code is also described. (author)

  16. Measuring Cross-Section and Estimating Uncertainties with the fissionTPC

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Manning, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sangiorgio, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Seilhan, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-30

    The purpose of this document is to outline the prescription for measuring fission cross-sections with the NIFFTE fissionTPC and estimating the associated uncertainties. As such it will serve as a work planning guide for NIFFTE collaboration members and facilitate clear communication of the procedures used to the broader community.

  17. ALICE TPC gas system is the first of the LHC experiments to be put on line

    CERN Document Server

    Maximilien Brice

    2006-01-01

    Picture 01 : the Physics Department's DT1 gas systems team in their laboratory. Picture 02 : Chilo Garabatos (ALICE) and Stefan Haider (PH-DT1-GS) in front of the gas system for the ALICE TPC which has just been put on line.

  18. Assessment of indirect losses and costs of emergency for project planning of alpine hazard mitigation

    Science.gov (United States)

    Amenda, Lisa; Pfurtscheller, Clemens

    2013-04-01

    By virtue of augmented settling in hazardous areas and increased asset values, natural disasters such as floods, landslides and rockfalls cause high economic losses in Alpine lateral valleys. Especially in small municipalities, indirect losses, mainly stemming from a breakdown of transport networks, and costs of emergency can reach critical levels. A quantification of these losses is necessary to estimate the worthiness of mitigation measures, to determine the appropriate level of disaster assistance and to improve risk management strategies. There are comprehensive approaches available for assessing direct losses. However, indirect losses and costs of emergency are widely not assessed and the empirical basis for estimating these costs is weak. To address the resulting uncertainties of project appraisals, a standardized methodology has been developed dealing with issues of local economic effects and emergency efforts needed. In our approach, the cost-benefit-analysis for technical mitigation of the Austrian Torrent and Avalanche Control (TAC) will be optimized and extended using the 2005-debris flow as a design event, which struggled a small town in the upper Inn valley in southwest Tyrol (Austria). Thereby, 84 buildings were affected, 430 people were evacuated and due to this, the TAC implemented protection measures for 3.75 million Euros. Upgrading the method of the TAC and analyzing to what extent the cost-benefit-ratio is about to change, is one of the main objectives of this study. For estimating short-run indirect effects and costs of emergency on the local level, data was collected via questionnaires, field mapping, guided interviews, as well as intense literature research. According to this, up-to-date calculation methods were evolved and the cost-benefit-analysis of TAC was recalculated with these new-implemented results. The cost-benefit-ratio will be more precise and specific and hence, the decision, which mitigation alternative will be carried out

  19. Windpower project ownership and financing: The cost impacts of alternative development structures

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H. [Lawrence Berkeley National Lab., CA (United States)

    1997-12-31

    This paper uses traditional financial cash-flow techniques to examine the impact of different ownership and financing structures on the cost of wind energy. While most large-scale wind projects are constructed, operated, and financed by non-utility generators (NUGs) via project financing, investor- and publicly-owned utilities have expressed interest in owning and financing their own facilities rather than purchasing wind energy from independent generators. A primary justification for utility ownership is that, because of financing and tax benefits, windpower may be cheaper when developed in this fashion. The results presented in this paper support that justification, though some of the estimated cost savings associated with utility ownership are found to be a result of shortcomings in utility analysis procedures and implicit risk shifting. This paper also discusses the comparative value of the federal production tax credit and renewable energy production incentive; estimates the financing premium paid by NUG wind owners compared to traditional gas-fired generation facilities; and explores the impact of electricity restructuring on financing.

  20. Neutrino Event Reconstruction in a Liquid Argon TPC

    Energy Technology Data Exchange (ETDEWEB)

    Barker, Gary, E-mail: G.J.Barker@Warwick.ac.uk [Department of Physics, University of Warwick, Gibbet Hill Road, Coventry CV4 7AL (United Kingdom)

    2011-07-25

    We present some preliminary findings and results from activities in Europe and the USA working towards an automated, algorithmic, reconstruction of particle interactions in liquid argon time projection chambers.

  1. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Russell, E.W.; Clarke, W. [Lawrence Livermore National Lab., CA (United States); Domian, H.A. [Babcock and Wilcox Co., Lynchburg, VA (United States); Madson, A.A. [Kaiser Engineers California Corp., Oakland, CA (United States)

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B&S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs.

  2. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Russell, E.W.; Clarke, W.; Domian, H.A.; Madson, A.A.

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B ampersand S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs

  3. Global warming response options in Brazil's forest sector: comparison of project-level costs and benefits

    International Nuclear Information System (INIS)

    Fearnside, P.M.

    1995-01-01

    A project-level assessment of monetary and carbon costs and benefits for five classes of global warming response options in the forest sector is attempted for typical Brazilian conditions. Options considered are: silvicultural plantations (for pulp, charcoal and sawlogs), sustainable timber management and reduction of deforestation. Comparison of pulpwood and sawlog plantations with the vegetation characteristic of deforested areas indicates of modest carbon benefit. Plantations for charcoal can produce a substantial carbon benefit through fossil fuel substitution, but much of this calculated benefit disappears if discount rates greater than zero are applied to carbon. Sustainable timber management, when compared with existing forest, represents a net carbon loss, accumulation of carbon in wood products being insufficient to compensate for biomass reduction over a 100 year time scale. Reduction of deforestation has great potential as a global warming response option, its per-hectare carbon benefits being approximately four times that of silvicultural plantation establishment for pulp and sawlogs over a 100 year period. The costs of reducing deforestation are difficult to assess, however, due to the importance of government policy changes such as removal of land speculation and land tenure establishment as motives for clearing. Although these changes would not cost money and would have tremendous carbon and other benefits, they have not yet occurred. (Author)

  4. Cost-Benefit Study of a Project to Lower Cost and Improve Fleet Readiness through Integrating the Management of Technical Information

    OpenAIRE

    Levine, Dan

    2010-01-01

    Proceedings Paper (for Acquisition Research Program) Approved for public release; distribution unlimited. This paper describes a cost-benefit analysis by the Institute for Defense Analyses of the ''Bridge Project'' that ADL (Advanced Distributed Learning) is conducting for the Office of Secretary of Defense for Acquisition, Technology and Logistics (OSD(AT&L) to improve the management of Integrated Logistics Support (ILS). The Project is part of the OSD RTOC program (Reduction in Total ...

  5. Design of the cryogenic systems for the Near and Far LAr-TPC detectors of the Short-Baseline Neutrino program (SBN) at Fermilab

    CERN Document Server

    Geynisman, M; Chalifour, M; Delaney, M; Dinnon, M; Doubnik, R; Hentschel, S; Kim, M J; Montanari, C; Montanari, D; Nichols, T; Norris, B; Sarychev, M; Schwartz, F; Tillman, J; Zuckerbrot, M

    2017-01-01

    The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ~260 tons) and SBN’s Far Detector (SBN-FD, ~760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements for the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution prese...

  6. Design of the cryogenic systems for the Near and Far LAr-TPC detectors of the Short-Baseline Neutrino program (SBN) at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Geynisman, M. [Fermilab; Bremer, J. [CERN; Chalifour, M. [CERN; Delaney, M. [Fermilab; Dinnon, M. [Fermilab; Doubnik, R. [Fermilab; Hentschel, S. [Fermilab; Kim, M. J. [Fermilab; Montanari, C. [INFN, Pavia; Monatanari, D. [Fermilab; Nichols, T. [Fermilab; Norris, B. [Fermilab; Sarychev, M. [Fermilab; Schwartz, F. [Fermilab; Tillman, J. [Fermilab; Zuckerbrot, M. [Fermilab

    2017-08-31

    The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ~260 tons) and SBN’s Far Detector (SBN-FD, ~760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements for the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution presents specific design requirements and typical implementation solutions for each sub-system of the SBND and SBN-FD cryogenic systems.

  7. Automotive Manufacturers' Cost/Revenue, Financial and Risk Analysis : Projected Impact of Automobile Manufacturing on the Plastics Industry

    Science.gov (United States)

    1979-08-01

    The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...

  8. A time projection chamber with GEM-based readout

    Energy Technology Data Exchange (ETDEWEB)

    Attié, David [CEA Saclay, IRFU, F-91191 Gif-sur-Yvette (France); Behnke, Ties [Deutsches Elektronen-Synchrotron DESY, A Research Centre of the Helmholtz Association, Notkestrasse 85, 22607 Hamburg (Hamburg site) (Germany); Bellerive, Alain [Carleton University, Department of Physics, 1125 Colonel By Drive, Ottawa, ON, Canada K1S 5B6 (Canada); Bezshyyko, Oleg [Taras Shevchenko National University of Kyiv, 64/13, Volodymyrska Street, City of Kyiv 01601 (Ukraine); Bhattacharya, Deb Sankar [CEA Saclay, IRFU, F-91191 Gif-sur-Yvette (France); now at Saha Institute of Nuclear Physics, 1/AF, Sector 1, Bidhan Nagar, Kolkata 700064 (India); Bhattacharya, Purba [Saha Institute of Nuclear Physics, 1/AF, Sector 1, Bidhan Nagar, Kolkata 700064 (India); now at National Institute of Science Education and Research (NISER) Bhubaneswar, P.O. Jatni, Khurda 752050, Odisha (India); Bhattacharya, Sudeb [Saha Institute of Nuclear Physics, 1/AF, Sector 1, Bidhan Nagar, Kolkata 700064 (India); Caiazza, Stefano [Deutsches Elektronen-Synchrotron DESY, A Research Centre of the Helmholtz Association, Notkestrasse 85, 22607 Hamburg (Hamburg site) (Germany); now at Johannes Gutenberg Universität Mainz, Institut für Physik, 55099 Mainz (Germany); Colas, Paul [CEA Saclay, IRFU, F-91191 Gif-sur-Yvette (France); Lentdecker, Gilles De [Inter University ULB-VUB, Av. Fr. Roosevelt 50, B1050 Bruxelles (Belgium); Dehmelt, Klaus [Deutsches Elektronen-Synchrotron DESY, A Research Centre of the Helmholtz Association, Notkestrasse 85, 22607 Hamburg (Hamburg site) (Germany); now at State University of New York at Stony Brook, Department of Physics and Astronomy, Stony Brook, NY 11794-3800 (United States); Desch, Klaus [Universität Bonn, Physikalisches Institut, Nußallee 12, 53115 Bonn (Germany); and others

    2017-06-01

    For the International Large Detector concept at the planned International Linear Collider, the use of time projection chambers (TPC) with micro-pattern gas detector readout as the main tracking detector is investigated. In this paper, results from a prototype TPC, placed in a 1 T solenoidal field and read out with three independent Gas Electron Multiplier (GEM) based readout modules, are reported. The TPC was exposed to a 6 GeV electron beam at the DESY II synchrotron. The efficiency for reconstructing hits, the measurement of the drift velocity, the space point resolution and the control of field inhomogeneities are presented.

  9. HIV prevention costs and program scale: data from the PANCEA project in five low and middle-income countries

    Directory of Open Access Journals (Sweden)

    Stanley Nicci

    2007-07-01

    Full Text Available Abstract Background Economic theory and limited empirical data suggest that costs per unit of HIV prevention program output (unit costs will initially decrease as small programs expand. Unit costs may then reach a nadir and start to increase if expansion continues beyond the economically optimal size. Information on the relationship between scale and unit costs is critical to project the cost of global HIV prevention efforts and to allocate prevention resources efficiently. Methods The "Prevent AIDS: Network for Cost-Effectiveness Analysis" (PANCEA project collected 2003 and 2004 cost and output data from 206 HIV prevention programs of six types in five countries. The association between scale and efficiency for each intervention type was examined for each country. Our team characterized the direction, shape, and strength of this association by fitting bivariate regression lines to scatter plots of output levels and unit costs. We chose the regression forms with the highest explanatory power (R2. Results Efficiency increased with scale, across all countries and interventions. This association varied within intervention and within country, in terms of the range in scale and efficiency, the best fitting regression form, and the slope of the regression. The fraction of variation in efficiency explained by scale ranged from 26% – 96%. Doubling in scale resulted in reductions in unit costs averaging 34.2% (ranging from 2.4% to 58.0%. Two regression trends, in India, suggested an inflection point beyond which unit costs increased. Conclusion Unit costs decrease with scale across a wide range of service types and volumes. These country and intervention-specific findings can inform projections of the global cost of scaling up HIV prevention efforts.

  10. New read-out electronics for ICARUS-T600 liquid Argon TPC. Description, simulation and tests of the new front-end and ADC system arXiv

    CERN Document Server

    Bagby, L.; Bellini, V.; Bonesini, M.; Braggiotti, A.; Castellani, L.; Centro, S.; Cervi, T.; Cocco, A.G.; Fabris, F.; Falcone, A.; Farnese, C.; Fava, A.; Fichera, F.; Franciotti, D.; Galet, G.; Gibin, D.; Guglielmi, A.; Guida, R.; Ketchum, W.; Marchini, S.; Menegolli, A.; Meng, G.; Menon, G.; Montanari, C.; Nessi, M.; Nicoletto, M.; Pedrotta, R.; Picchi, P.; Pietropaolo, F.; Rampazzo, G.; Rappoldi, A.; Raselli, G.L.; Rossella, M.; Rubbia, C.; Scaramelli, A.; Sergiampietri, F.; Spanu, M.; Torti, M.; Tortorici, F.; Varanini, F.; Ventura, S.; Vignoli, C.; Zani, A.; Zatti, P.G.

    The ICARUS T600, a liquid argon time projection chamber (LAr-TPC) detector mainly devoted to neutrino physics, underwent a major overhauling at CERN in 2016-2017, which included also a new design of the read-out electronics, in view of its operation in Fermilab on the Short Baseline Neutrino (SBN) beam from 2019. The new more compact electronics showed capability of handling more efficiently the signals also in the intermediate Induction 2 wire plane with a significant increase of signal to noise (S/N), allowing for charge measurement also in this view. The new front-end and the analog to digital conversion (ADC) system are presented together with the results of the tests on 50 liters liquid argon TPC performed at CERN with cosmic rays.

  11. Mapping water availability, projected use and cost in the western United States

    Science.gov (United States)

    Tidwell, Vincent C.; Moreland, Barbara D.; Zemlick, Katie M.; Roberts, Barry L.; Passell, Howard D.; Jensen, Daniel; Forsgren, Christopher; Sehlke, Gerald; Cook, Margaret A.; King, Carey W.; Larsen, Sara

    2014-05-01

    New demands for water can be satisfied through a variety of source options. In some basins surface and/or groundwater may be available through permitting with the state water management agency (termed unappropriated water), alternatively water might be purchased and transferred out of its current use to another (termed appropriated water), or non-traditional water sources can be captured and treated (e.g., wastewater). The relative availability and cost of each source are key factors in the development decision. Unfortunately, these measures are location dependent with no consistent or comparable set of data available for evaluating competing water sources. With the help of western water managers, water availability was mapped for over 1200 watersheds throughout the western US. Five water sources were individually examined, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Also mapped was projected change in consumptive water use from 2010 to 2030. Associated costs to acquire, convey and treat the water, as necessary, for each of the five sources were estimated. These metrics were developed to support regional water planning and policy analysis with initial application to electric transmission planning in the western US.

  12. Projection of Big Cities Waste Management and Cost Based on Economic and Demographic Factors in Indonesia

    Science.gov (United States)

    Prajati, Gita; Padmi, Tri; Benno Rahardyan, dan

    2017-12-01

    Nowadays, solid waste management continues to be a major challenge in urban areas, especially in developing country. It is triggered by population growth, economic growth, industrialization and urbanization. Indonesia itselfs categorized into developing country. Indonesia's government has many program in order to increase the economic growth. One of them is MP3EI (Masterplan Percepatan dan Perluasan Pembangunan Ekonomi Indonesia. This program should be suppported by right waste management system. If Indonesia's waste management system can't afford the economic growth, it will trigger health and environmental problems. This study's purpose is to develop the socio-economic-environment model that can be used as a basis planning for the facility and cost of waste management systems. In this paper we used the development of Khajuria model test method. This method used six variables, which are GDP, population, population density, illiteracy, school's period and economic growth. The result showed that development of Khajuria test could explained the influence of economic and demographic factors to waste generation, 65.6%. The projection of waste generation shows that Pangkalpinang, Pekanbaru and Serang are the cities with the highest waste generation for the next five years. The number of dump truck and TPS in DKI Jakarata is the highest within another city, which is 39.37%. For the next five years, the waste management system in our study areas cost maximum 0.8% from GDP (Gross Domestic Products).

  13. Project Minerva: A low cost manned Mars mission based on indigenous propellant production

    Science.gov (United States)

    Beder, David; Bryan, Richard; Bui, Tuyen; Caviezel, Kelly; Cinnamon, Mark; Daggert, Todd; Folkers, Mike; Fornia, Mark; Hanks, Natasha; Hamilton, Steve

    1992-01-01

    Project Minerva is a low-cost manned Mars mission designed to deliver a crew of four to the Martian surface using only two sets of two launches from the Kennedy Space Center. Key concepts which make this mission realizable are the use of near-term technologies and in-situ propellant production, following the scenario originally proposed by R. Zubrin. The first set of launches delivers two unmanned payloads into low Earth orbit (LEO): the first payload consists of an Earth Return Vehicle (ERV), a propellant production plant, and a set of robotic vehicles; the second payload consists of the trans-Mars injection (TMI) upper stage. In LEO, the two payloads are docked and the configuration is injected into a Mars transfer orbit. The landing on Mars is performed with the aid of multiple aerobraking maneuvers. On the Martian surface, the propellant production plant uses a Sabatier/electrolysis type process to combine nine tons of hydrogen with carbon dioxide from the Martian atmosphere to produce over a hundred tons of liquid oxygen and liquid methane, which are later used as the propellants for the rover expeditions and the manned return journey of the ERV. The systems necessary for the flights to and from Mars, as well as those needed for the stay on Mars, are discussed. These systems include the transfer vehicle design, life support, guidance and communications, rovers and telepresence, power generation, and propellant manufacturing. Also included are the orbital mechanics, the scientific goals, and the estimated mission costs.

  14. Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    Warren, R.N.

    1998-09-29

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

  15. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  16. Multiple Kernel Sparse Representation based Orthogonal Discriminative Projection and Its Cost-Sensitive Extension.

    Science.gov (United States)

    Zhang, Guoqing; Sun, Huaijiang; Xia, Guiyu; Sun, Quansen

    2016-07-07

    Sparse representation based classification (SRC) has been developed and shown great potential for real-world application. Based on SRC, Yang et al. [10] devised a SRC steered discriminative projection (SRC-DP) method. However, as a linear algorithm, SRC-DP cannot handle the data with highly nonlinear distribution. Kernel sparse representation-based classifier (KSRC) is a non-linear extension of SRC and can remedy the drawback of SRC. KSRC requires the use of a predetermined kernel function and selection of the kernel function and its parameters is difficult. Recently, multiple kernel learning for SRC (MKL-SRC) [22] has been proposed to learn a kernel from a set of base kernels. However, MKL-SRC only considers the within-class reconstruction residual while ignoring the between-class relationship, when learning the kernel weights. In this paper, we propose a novel multiple kernel sparse representation-based classifier (MKSRC), and then we use it as a criterion to design a multiple kernel sparse representation based orthogonal discriminative projection method (MK-SR-ODP). The proposed algorithm aims at learning a projection matrix and a corresponding kernel from the given base kernels such that in the low dimension subspace the between-class reconstruction residual is maximized and the within-class reconstruction residual is minimized. Furthermore, to achieve a minimum overall loss by performing recognition in the learned low-dimensional subspace, we introduce cost information into the dimensionality reduction method. The solutions for the proposed method can be efficiently found based on trace ratio optimization method [33]. Extensive experimental results demonstrate the superiority of the proposed algorithm when compared with the state-of-the-art methods.

  17. Multiobjective optimization applied to structural sizing of low cost university-class microsatellite projects

    Science.gov (United States)

    Ravanbakhsh, Ali; Franchini, Sebastián

    2012-10-01

    In recent years, there has been continuing interest in the participation of university research groups in space technology studies by means of their own microsatellites. The involvement in such projects has some inherent challenges, such as limited budget and facilities. Also, due to the fact that the main objective of these projects is for educational purposes, usually there are uncertainties regarding their in orbit mission and scientific payloads at the early phases of the project. On the other hand, there are predetermined limitations for their mass and volume budgets owing to the fact that most of them are launched as an auxiliary payload in which the launch cost is reduced considerably. The satellite structure subsystem is the one which is most affected by the launcher constraints. This can affect different aspects, including dimensions, strength and frequency requirements. In this paper, the main focus is on developing a structural design sizing tool containing not only the primary structures properties as variables but also the system level variables such as payload mass budget and satellite total mass and dimensions. This approach enables the design team to obtain better insight into the design in an extended design envelope. The structural design sizing tool is based on analytical structural design formulas and appropriate assumptions including both static and dynamic models of the satellite. Finally, a Genetic Algorithm (GA) multiobjective optimization is applied to the design space. The result is a Pareto-optimal based on two objectives, minimum satellite total mass and maximum payload mass budget, which gives a useful insight to the design team at the early phases of the design.

  18. Magnetic Field Requirements for a Detector at the Linear Collider Using a TPC as Main Tracking Device

    CERN Document Server

    Klempt, W

    2010-01-01

    This note describes the requirements to the magnetic field which occur in an ILD like detector at ILC or CLIC. In particular we describe requirements introduced by choosing a TPC as main tracking detector.

  19. Results on search for a QGP with a TPC magnetic spectrometer at AGS and plans for an ∼4π TPC magnetic spectrometer at RHIC

    International Nuclear Information System (INIS)

    Lindenbaum, S.J.

    1991-01-01

    In the first part of this paper a search for a Quark-Gluon Plasma (QGP) with a TPC Magnetic Spectrometer at AGS by the BNL/CCNY/Johns Hopkins/Rice (E-810) Collaboration is discussed. At AGS energies the expected increase in baryon density is near maximum. If a QGP is formed even rarely this approach provides a sensitive method for its detection. We have found some interesting phenomena including strangeness enhancement, multi-Λ and K s 0 events and an increased slope for π - (corresponding to a reduced temperature) in the usual temperature plot for p perpendicular < 0.2 GeV/c. We plan to increase the statistics with the 14.5 GeV/c x A Si ions on targets from light to heavy and then to continue the program with incident Au ions. In Part 2 we discuss the BNL/CCNY/Notre Dame/Rice proposal for an ∼ 4π TPC Magnetic Spectrometer for RHIC which we believe will be a sensitive probe for hadronic QGP signals, and also capable of observing departures from QCD should they occur. 8 refs., 12 figs

  20. Search for a QGP with a TPC spectrometer, and QGP signals predicted by new event generator

    International Nuclear Information System (INIS)

    Lindenbaum, S.J.

    1988-01-01

    The BNL/CCNY/Johns Hopkins/Rice Collaboration has developed and successfully tested a TPC Magnetic Spectrometer to search for OGP signals produced by ion beams at AGS. Test data with 14.5 GeV/c /times/ A Oxygen ions incident on a Pb target has been obtained. These include a 78-prong nuclear interaction in the MPS magnet which was pattern recognized with an efficiency ∼75%. A cascade and plasma event generator has also been developed, the predictions of which are used to illustrate how our technique can detect possible plasma signals at AGS and RHIC. A 4π tracking TPC magnetic spectrometer has been proposed for RHIC. The new event generator predicts striking central rapidity bump QGP signals at RHIC for p, /bar p/, π/sup +-/, K/sup +-/, etc., produced by 100 GeV/c /times/ A Au on Au collisions and these are presented. 2 refs., 13 figs., 1 tab

  1. On distortions of TPC coordinates: inhomogeneities of electric and magnetic field

    CERN Document Server

    Dydak, F

    2003-01-01

    After a general discussion of electron drift in a gas volume with electric and magnetic fields, distortions in the r and r phi coordinates arising from inhomogeneities of the electric and magnetic fields in the HARP TPC are calculated. Inhomogeneities of the electric field arise from i) positive ions released by cosmic rays, ii) positive ions released by interaction secondaries, iii) positive ions released by beam muons, iv) positive ions released from beam particles downstream of the inner field cage, and v) a high voltage misalignment between the outer and inner field cages. Also, distortions arising from the inhomogeneity of the magnetic field are calculated. These effects resolve the controversy on unphysical numbers of 'wrong-charge' TPC tracks. The bad news are that effects are too big to be neglected. The good news are that, with enough sweat and tears, they can be adequately corrected.

  2. Simulation of double beta decay in the 'SeXe' TPC

    Energy Technology Data Exchange (ETDEWEB)

    Mauger, F [LPC Caen and University of Caen, ENSICAEN, 6 Bd Marechal Juin, 14050 CAEN CEDEX 4 (France)

    2007-04-15

    In 2004, the NEMO collaboration has started some preliminary studies for a next-generation double beta decay experiment: SuperNEMO. The possibility to use a large gaseous TPC has been investigated using simulation and extrapolation of former experiments. In this talk, I report on the reasons why such techniques have not been selected in 2004 and led the NEMO collaboration to reuse the techniques implemented within the NEMO3 detector.

  3. Simulation of double beta decay in the ''SeXe'' TPC

    Science.gov (United States)

    Mauger, F.

    2007-04-01

    In 2004, the NEMO collaboration has started some preliminary studies for a next-generation double beta decay experiment: SuperNEMO. The possibility to use a large gaseous TPC has been investigated using simulation and extrapolation of former experiments. In this talk, I report on the reasons why such techniques have not been selected in 2004 and led the NEMO collaboration to reuse the techniques implemented within the NEMO3 detector.

  4. First performance results of the ALICE TPC Readout Control Unit 2

    OpenAIRE

    Zhao, Chengxin; Alme, Johan; Alt, Torsten; Appelshäuser, Harald; Bratrud, Lars Karlot Stubberud; Castro, Andrew; Costa, Filippo; David, Ernö; Gunji, Tako; Kirsch, S; Kiss, Tivadar; Langøy, Rune; Lien, Jørgen; Lippmann, C; Oskarsson, Anders

    2016-01-01

    - This paper presents the first performance results of the ALICE TPC Readout Control Unit 2 (RCU2). With the upgraded hardware typology and the new readout scheme in FPGA design, the RCU2 is designed to achieve twice the readout speed of the present Readout Control Unit. Design choices such as using the flash-based Microsemi Smartfusion2 FPGA and applying mitigation techniques in interfaces and FPGA design ensure a high degree of radiation tolerance. This paper presents the system level ir...

  5. Accurate gamma and MeV-electron track reconstruction with an ultra-low diffusion Xenon/TMA TPC at 10 atmospheres

    CERN Document Server

    González-Díaz, Diego; Borges, F.I.G.; Camargo, M.; Cárcel, S.; Cebrián, S.; Cervera, A.; Conde, C.A.N.; Dafni, T.; Díaz, J.; Esteve, R.; Fernandes, L.M.P.; Ferrario, P.; Ferreira, A.L.; Freitas, E.D.C.; Gehman, V.M.; Goldschmidt, A.; Gómez-Cadenas, J.J.; Gutiérrez, R.M.; Hauptman, J.; Hernando Morata, J.A.; Herrera, D.C.; Irastorza, I.G.; Labarga, L.; Laing, A.; Liubarsky, I.; Lopez-March, N.; Lorca, D.; Losada, M.; Luzón, G.; Marí, A.; Martín-Albo, J.; Martínez-Lema, G.; Martínez, A.; Miller, T.; Monrabal, F.; Monserrate, M.; Monteiro, C.M.B.; Mora, F.J.; Moutinho, L.M.; Muñoz Vidal, J.; Nebot-Guinot, M.; Nygren, D.; Oliveira, C.A.B.; Pérez, J.; Pérez Aparicio, J.L.; Querol, M.; Renner, J.; Ripoll, L.; Rodríguez, J.; Santos, F.P.; dos Santos, J.M.F.; Serra, L.; Shuman, D.; Simón, A.; Sofka, C.; Sorel, M.; Toledo, J.F.; Torrent, J.; Tsamalaidze, Z.; Veloso, J.F.C.A.; Villar, J.A.; Webb, R.; White, J.T.; Yahlali, N.; Azevedo, C.; Aznar, F.; Calvet, D.; Castel, J.; Ferrer-Ribas, E.; García, J.A.; Giomataris, I.; Gómez, H.; Iguaz, F.J.; Lagraba, A.; Le Coguie, A.; Mols, J.P.; Şahin, Ö.; Rodríguez, A.; Ruiz-Choliz, E.; Segui, L.; Tomás, A.; Veenhof, R.

    2015-01-01

    We report the performance of a 10 atm Xenon/trimethylamine time projection chamber (TPC) for the detection of X-rays (30 keV) and gamma-rays (0.511-1.275 MeV) in conjunction with the accurate tracking of the associated electrons. When operated at such a high pressure and in 1%-admixtures, trimethylamine (TMA) endows Xenon with an extremely low electron diffusion (1.3 +-0.13 mm-sigma (longitudinal), 0.8 +-0.15 mm-sigma (transverse) along 1 m drift) besides forming a convenient Penning-Fluorescent mixture. The TPC, that houses 1.1 kg of gas in its active volume, operated continuously for 100 live-days in charge amplification mode. The readout was performed through the recently introduced microbulk Micromegas technology and the AFTER chip, providing a 3D voxelization of 8mm x 8mm x 1.2mm for approximately 10 cm/MeV-long electron tracks. This work was developed as part of the R&D program of the NEXT collaboration for future detector upgrades in the search of the 0bbnu decay in 136Xe, specifically those based ...

  6. A Prototype Combination TPC Cherenkov Detector with GEM Readout for Tracking and Particle Identification and its Potential Use at an Electron Ion Collider

    Directory of Open Access Journals (Sweden)

    Woody Craig

    2018-01-01

    Full Text Available A prototype detector is being developed which combines the functions of a Time Projection Chamber for charged particle tracking and a Cherenkov detector for particle identification. The TPC consists of a 10×10×10 cm3 drift volume where the charge is drifted to a 10×10 cm2 triple GEM detector. The charge is measured on a readout plane consisting of 2×10 mm2 chevron pads which provide a spatial resolution ∼ 100 μm per point in the chevron direction along with dE/dx information. The Cherenkov portion of the detector consists of a second 10×10 cm2 triple GEM with a photosensitive CsI photocathode on the top layer. This detector measures Cherenkov light produced in the drift gas of the TPC by high velocity particles which are above threshold. CF4 or CF4 mixtures will be used as the drift gas which are highly transparent to UV light and can provide excellent efficiency for detecting Cherenkov photons. The drift gas is also used as the operating gas for both GEM detectors. The prototype detector has been constructed and is currently being tested in the lab with sources and cosmic rays, and additional tests are planned in the future to study the detector in a test beam.

  7. A Prototype Combination TPC Cherenkov Detector with GEM Readout for Tracking and Particle Identification and its Potential Use at an Electron Ion Collider

    Science.gov (United States)

    Woody, Craig; Azmoun, Babak; Majka, Richard; Phipps, Michael; Purschke, Martin; Smirnov, Nikolai

    2018-02-01

    A prototype detector is being developed which combines the functions of a Time Projection Chamber for charged particle tracking and a Cherenkov detector for particle identification. The TPC consists of a 10×10×10 cm3 drift volume where the charge is drifted to a 10×10 cm2 triple GEM detector. The charge is measured on a readout plane consisting of 2×10 mm2 chevron pads which provide a spatial resolution ˜ 100 μm per point in the chevron direction along with dE/dx information. The Cherenkov portion of the detector consists of a second 10×10 cm2 triple GEM with a photosensitive CsI photocathode on the top layer. This detector measures Cherenkov light produced in the drift gas of the TPC by high velocity particles which are above threshold. CF4 or CF4 mixtures will be used as the drift gas which are highly transparent to UV light and can provide excellent efficiency for detecting Cherenkov photons. The drift gas is also used as the operating gas for both GEM detectors. The prototype detector has been constructed and is currently being tested in the lab with sources and cosmic rays, and additional tests are planned in the future to study the detector in a test beam.

  8. Liquid Argon TPC Signal Formation, Signal Processing and Hit Reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Baller, Bruce [Fermilab

    2017-03-11

    This document describes the early stage of the reconstruction chain that was developed for the ArgoNeuT and MicroBooNE experiments at Fermilab. These experiments study accelerator neutrino interactions that occur in a Liquid Argon Time Projection Chamber. Reconstructing the properties of particles produced in these interactions requires knowledge of the micro-physics processes that affect the creation and transport of ionization electrons to the readout system. A wire signal deconvolution technique was developed to convert wire signals to a standard form for hit reconstruction, to remove artifacts in the electronics chain and to remove coherent noise.

  9. Projected Costs of Informal Caregiving for Cardiovascular Disease: 2015 to 2035: A Policy Statement From the American Heart Association.

    Science.gov (United States)

    Dunbar, Sandra B; Khavjou, Olga A; Bakas, Tamilyn; Hunt, Gail; Kirch, Rebecca A; Leib, Alyssa R; Morrison, R Sean; Poehler, Diana C; Roger, Veronique L; Whitsel, Laurie P

    2018-05-08

    In a recent report, the American Heart Association estimated that medical costs and productivity losses of cardiovascular disease (CVD) are expected to grow from $555 billion in 2015 to $1.1 trillion in 2035. Although the burden is significant, the estimate does not include the costs of family, informal, or unpaid caregiving provided to patients with CVD. In this analysis, we estimated projections of costs of informal caregiving attributable to CVD for 2015 to 2035. We used data from the 2014 Health and Retirement Survey to estimate hours of informal caregiving for individuals with CVD by age/sex/race using a zero-inflated binomial model and controlling for sociodemographic factors and health conditions. Costs of informal caregiving were estimated separately for hypertension, coronary heart disease, heart failure, stroke, and other heart disease. We analyzed data from a nationally representative sample of 16 731 noninstitutionalized adults ≥54 years of age. The value of caregiving hours was monetized by the use of home health aide workers' wages. The per-person costs were multiplied by census population counts to estimate nation-level costs and to be consistent with other American Heart Association analyses of burden of CVD, and the costs were projected from 2015 through 2035, assuming that within each age/sex/racial group, CVD prevalence and caregiving hours remain constant. The costs of informal caregiving for patients with CVD were estimated to be $61 billion in 2015 and are projected to increase to $128 billion in 2035. Costs of informal caregiving of patients with stroke constitute more than half of the total costs of CVD informal caregiving ($31 billion in 2015 and $66 billion in 2035). By age, costs are the highest among those 65 to 79 years of age in 2015 but are expected to be surpassed by costs among those ≥80 years of age by 2035. Costs of informal caregiving for patients with CVD represent an additional 11% of medical and productivity costs

  10. First considerations for a readout system for the ILD TPC with the Timepix3

    Energy Technology Data Exchange (ETDEWEB)

    Schiffer, Tobias [Universitaet Bonn (Germany); Collaboration: LCTPC-Deutschland-Collaboration

    2016-07-01

    For the planned International Linear Collider (ILC) two detectors are proposed. One of them, the International Large Detector (ILD) uses a Time Projektion Chamber (TPC) as the main tracking device. As a readout system for this TPC, pixel chips are one of the considered options. An integrated Micromegas stage is foreseen as gas amplification stage, which is built directly on top of the chip. Since first tests of a Pixel-TPC with 160 Timepix ASICs showed promising results, one is interested in developing a detector using the Timepix3 ASIC. It has several advantages, first of all its feature to measure ToT and a ToA at the same time and its significantly increased readout rate. For this purpose a readout system needs to be developed which fulfils the requirements of the Timpix3 ASIC and also has a high scalability. The main challenges are the high speed readout with a clock of up to 640 MHz and the reliability of the system. Also, the data driven as well as the frame-based readout of the Timepix3 needs to be considered for the implementation. The main goal is to provide a fast and parallel readout of several million channels. An overview and the status of the planning is given. Also, the development challenges are discussed.

  11. Alpha-lipoic acid induces sodium iodide symporter expression in TPC-1 thyroid cancer cell line

    International Nuclear Information System (INIS)

    Choi, Hyun-Jeung; Kim, Tae Yong; Ruiz-Llorente, Sergio; Jeon, Min Ji; Han, Ji Min; Kim, Won Gu; Shong, Young Kee; Kim, Won Bae

    2012-01-01

    Introduction: Patients with metastatic thyroid cancers that do not uptake iodine need effective therapeutic option. Differentiation-inducing agents have been tried to restore functional expression of sodium iodide symporter (NIS) without success. Our objective was to assess the effect of alpha-lipoic acid (ALA), known as potential antioxidant, on expression of sodium iodide symporter in thyroid cancer cells. Methods: Human thyroid cancer-derived cell lines, TPC-1, were treated with ALA, and changes in NIS mRNA and protein expression were measured. ALA's effect on NIS gene promoter was evaluated, and functional NIS expression was assessed by iodide uptake assay. Results: Treatment with ALA increased NIS mRNA expression up to ten folds of control dose-dependently after 24 h of exposure. ALA increased NIS promoter activity, and increased iodide uptake by 1.6 fold. ALA induced expression of NIS protein, but had no significant effect on the plasma membrane trafficking. ALA increased phosphorylation of CREB and nuclear translocation of pCREB, and co-treatment of ALA and trichostatin A increased iodide uptake by three folds in TPC-1 cells. Conclusions: ALA is a potential agent to increase NIS transcription in TPC-1. It could be used as an adjunctive agent to increase efficacy of radioiodine therapy if combined with a strategy to increase NIS protein trafficking to cell membrane.

  12. Structure of Voltage-gated Two-pore Channel TPC1 from Arabidopsis thaliana

    Science.gov (United States)

    Guo, Jiangtao; Zeng, Weizhong; Chen, Qingfeng; Lee, Changkeun; Chen, Liping; Yang, Yi; Cang, Chunlei; Ren, Dejian; Jiang, Youxing

    2015-01-01

    Two-pore channels (TPCs) contain two copies of a Shaker-like six-transmembrane (6-TM) domain in each subunit and are ubiquitously expressed in both animals and plants as organellar cation channels. Here, we present the first crystal structure of a vacuolar two-pore channel from Arabidopsis thaliana, AtTPC1, which functions as a homodimer. AtTPC1 activation requires both voltage and cytosolic Ca2+. Ca2+ binding to the cytosolic EF-hand domain triggers conformational changes coupled to the pair of pore-lining inner helices (IS6 helices) from the first 6-TM domains, whereas membrane potential only activates the second voltage-sensing domain (VSD2) whose conformational changes are coupled to the pair of inner helices (IIS6 helices) from the second 6-TM domains. Luminal Ca2+ or Ba2+ can modulate voltage activation by stabilizing VSD2 in the resting state and shifts voltage activation towards more positive potentials. Our Ba2+ bound AtTPC1 structure reveals a voltage sensor in the resting state, providing hitherto unseen structural insight into the general voltage-gating mechanism among voltage-gated channels. PMID:26689363

  13. Energy resolution studies of an IROC GEM prototype for the ALICE TPC

    Energy Technology Data Exchange (ETDEWEB)

    Mathis, Andreas [TU Muenchen, Physik Department E12, Excellence Cluster ' ' Universe' ' , D-85748, Garching (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    The ALICE collaboration (A Large Ion Collider Experiment) is planning an upgrade of its central barrel detectors, to be able to cope with the increased LHC luminosity beyond 2018. In order to fully exploit the increase in collision rate to about 50 kHz in Pb-Pb, the TPC is foreseen to be operated in an ungated mode with continuous readout. This demands for a replacement of the currently used, gated MWPC by GEM-based readout chambers, while retaining the present tracking and particle identification capabilities of the TPC via measurement of the specific energy loss (dE/dx). The present baseline solution for the TPC upgrade consists of a stack of four large-sized GEM foils as amplification stage, containing both Standard (S, 140 μm) and Large Pitch (LP, 280 μm) GEM foils arranged in the order S-LP-LP-S. This arrangement has been proven as advantageous in terms of ion backflow and energy resolution. A prototype of an ALICE IROC (Inner Readout Chamber) was equipped with such a quadruple GEM stack, installed inside a field cage and exposed to a beam of electrons and pions from the CERN PS. The performance of the prototype in terms of energy resolution has been evaluated and is presented.

  14. Projected reduction in healthcare costs in Belgium after optimization of iodine intake: impact on costs related to thyroid nodular disease.

    Science.gov (United States)

    Vandevijvere, Stefanie; Annemans, Lieven; Van Oyen, Herman; Tafforeau, Jean; Moreno-Reyes, Rodrigo

    2010-11-01

    Several surveys in the last 50 years have repeatedly indicated that Belgium is affected by mild iodine deficiency. Within the framework of the national food and health plan in Belgium, a selective, progressive, and monitored strategy was proposed in 2009 to optimize iodine intake. The objective of the present study was to perform a health economic evaluation of the consequences of inadequate iodine intake in Belgium, focusing on undisputed and measurable health outcomes such as thyroid nodular disease and its associated morbidity (hyperthyroidism). For the estimation of direct, indirect, medical, and nonmedical costs related to thyroid nodular diseases in Belgium, data from the Federal Public Service of Public Health, Food Chain Safety and Environment, the National Institute for Disease and Disability Insurance (RIZIV/INAMI), the Information Network about the prescription of reimbursable medicines (FARMANET), Intercontinental Marketing Services, and expert opinions were used. These costs translate into savings after implementation of the iodization program and are defined as costs due to thyroid nodular disease throughout the article. Costs related to the iodization program are referred to as program costs. Only figures dating from before the start of the intervention were exploited. Only adult and elderly people (≥18 years) were taken into account in this study because thyroid nodular diseases predominantly affect this age group. The yearly costs due to thyroid nodular diseases caused by mild iodine deficiency in the Belgian adult population are ∼€38 million. It is expected that the iodization program will result in additional costs of ∼€54,000 per year and decrease the prevalence of thyroid nodular diseases by 38% after a 4-5-year period. The net savings after establishment of the program are therefore estimated to be at least €14 million a year. Optimization of iodine intake in Belgium should be quite cost effective, if only considering its impact on

  15. Evaluation of learning moments, investment cost and life cost of five EOS DEMO/UKR projects; Evaluatie leermomenten, investerings- en levensduurkosten van vijf EOS DEMO/UKR projecten

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-03-15

    Subsidised, energy efficient building example projects in the Netherlands show that the additional cost of 10 to 15% for the initial investment are compensated by the much lower energy cost later on. A study has been conducted of the relation between investments, housing expenses and energy efficient building [Dutch] Gesubsidieerde, energiezuinig gebouwde voorbeeldprojecten in Nederland tonen aan dat de meerkosten van 10% tot 15% voor de initiele investering opwegen tegen de veel lagere energiekosten later. Een studie is uitgevoerd naar de relatie tussen investeringen, woonlasten en energiezuinig bouwen.

  16. Operation of a GEM-TPC with pixel readout

    CERN Document Server

    Brezina, C; Kaminski, J; Killenberg, M; Krautscheid, T

    2012-01-01

    A prototype time projection chamber with 26 cm drift length was operated with a short-spaced triple gas electron multiplier (GEM) stack in a setup triggering on cosmic muon tracks. A small part of the anode plane is read out with a CMOS pixel application-specified integrated circuit (ASIC) named Timepix, which provides ultimate readout granularity. Pixel clusters of charge depositions corresponding to single primary electrons are observed and analyzed to reconstruct charged particle tracks. A dataset of several weeks of cosmic ray data is analyzed. The number of clusters per track length is well described by simulation. The obtained single point resolution approaches 50 m at short drift distances and is well reproduced by a simple model of single-electron diffusion.

  17. Liquid argon TPC signal formation, signal processing and reconstruction techniques

    Science.gov (United States)

    Baller, B.

    2017-07-01

    This document describes a reconstruction chain that was developed for the ArgoNeuT and MicroBooNE experiments at Fermilab. These experiments study accelerator neutrino interactions that occur in a Liquid Argon Time Projection Chamber. Reconstructing the properties of particles produced in these interactions benefits from the knowledge of the micro-physics processes that affect the creation and transport of ionization electrons to the readout system. A wire signal deconvolution technique was developed to convert wire signals to a standard form for hit reconstruction, to remove artifacts in the electronics chain and to remove coherent noise. A unique clustering algorithm reconstructs line-like trajectories and vertices in two dimensions which are then matched to create of 3D objects. These techniques and algorithms are available to all experiments that use the LArSoft suite of software.

  18. TPC cathode read-out with C-pads

    International Nuclear Information System (INIS)

    Janik, R.; Pikna, M.; Sitar, B.; Strmen, P.; Szarka, I.

    2009-01-01

    A Time Projection Chamber with 'C' like shaped cathode pads was built and tested. It offers a low gas gain operation, a good pulse shape and a lightweight construction. The Pad Response Function (PRF), the cathode to anode pulse height ratios and the pad pulse shapes of the C-pad structure were measured and compared with planar cathode structures in two different wire geometries. The cathode to anode signal ratio was improved from between 0.2 and 0.4 up to 0.7. The PRF was considerably improved, it has a Gaussian shape and is narrower than in the case of the planar pads. The pulse shape from the C-pad read-out is similar to the pulse shape from a detector with a cylindrical shape of electrodes. A method for aluminum pad mass production based on a precise cold forging was developed and tested.

  19. PERSPECTIVE: REDD pilot project scenarios: are costs and benefits altered by spatial scale?

    Science.gov (United States)

    Carlson, Kimberly M.; Curran, Lisa M.

    2009-09-01

    Kimberly M Carlson Payments for reducing carbon emissions due to deforestation and degradation (REDD) have garnered considerable global interest and investments. These financial incentives aim to alter the drivers of land use change by reducing opportunity costs of retaining forest cover, and are often promoted as multipartite solutions that not only generate profits and reduce carbon emissions but provide benefits for human development and biodiversity. Currently, the United Nations Framework Convention on Climate Change (UNFCCC) is debating a post-Kyoto protocol with national or sub-national emission reduction targets. Anticipating the inclusion of REDD in this agreement, >80% of pilot REDD projects are being established in tropical regions (table 1). While the capacity of REDD projects to meet their stated objectives must be assessed post- implementation, land use change models are powerful tools for generating potential outcomes from these pilot initiatives. Table 1. Extent and emissions reductions for all REDD projects as reported by Ecosystem Marketplace, which maintains a comprehensive and up-to-date inventory of REDD projects that are selling credits and/or are verified by a third-party verifier. Adapted from Forest Carbon Portal (2009). Geographical zoneContinentProjects (#) Area (km2) Emissions reductions (Mt C) Tropical and Subtropical Africa2775019.50 Asia28100109.60 South America 9183 880278.24 TemperateAustralia1140.18 North America115N/A Totals15199 759407.52 In this issue of ERL, Gaveau et al (2009) use a spatially-explicit model to explore the potential of a REDD pilot project in northern Sumatra, Indonesia, to reduce deforestation and conserve orangutan biodiversity. This project is conceived by the Provincial Government of Aceh, financed by Merrill Lynch, and co-managed by carbon trading firm Carbon Conservation and NGO Flora and Fauna International. Project managers estimate CO2 emissions reductions at 3.4 Mt y-1 over 30 years across a 7500 km2

  20. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  1. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  2. arXiv Particle identification studies with a full-size 4-GEM prototype for the ALICE TPC upgrade

    CERN Document Server

    INSPIRE-00180720; Aiola, S.; Alme, J.; Alt, T.; Amend, W.; Andronic, A.; Anguelov, V.; Appelshäuser, H.; Arslandok, M.; Averbeck, R.; Ball, M.; Barnaföldi, G.G.; Bartsch, E.; Bellwied, R.; Bencedi, G.; Berger, M.; Bialas, N.; Bialas, P.; Bianchi, L.; Biswas, S.; Boldizsár, L.; Bratrud, L.; Braun-Munzinger, P.; Bregant, M.; Britton, C.L.; Brucken, E.J.; Caines, H.; Castro, A.J.; Chattopadhyay, S.; Christiansen, P.; Clonts, L.G.; Cormier, T.M.; Das, S.; Dash, S.; Deisting, A.; Dittrich, S.; Dubey, A.K.; Ehlers, R.; Erhardt, F.; Ezell, N.B.; Fabbietti, L.; Frankenfeld, U.; Gaardhøje, J.J.; Garabatos, C.; Gasik, P.; Gera, A.; Ghosh, P.; Ghosh, S.K.; Glässel, P.; Grachov, O.; Grein, A.; Gunji, T.; Hamagaki, H.; Hamar, G.; Harris, J.W.; Hehner, J.; Hellbär, E.; Helstrup, H.; Hilden, T.E.; Hohlweger, B.; Ivanov, M.; Jung, M.; Just, D.; Kangasaho, E.; Keidel, R.; Ketzer, B.; Khan, S.A.; Kirsch, S.; Klemenz, T.; Klewin, S.; Knospe, A.G.; Kowalski, M.; Kumar, L.; Lang, R.; Langoy, R.; Lautner, L.; Liebske, F.; Lien, J.; Lippmann, C.; Ljunggren, H.M.; Llope, W.J.; Mahmood, S.; Mahmoud, T.; Majka, R.; Malzacher, P.; Marín, A.; Markert, C.; Masciocchi, S.; Mathis, A.; Matyja, A.; Meres, M.; Mihaylov, D.L.; Miskowiec, D.; Mitra, J.; Mittelstaedt, T.; Morhardt, T.; Mulligan, J.; Munzer, R.H.; Münning, K.; Munhoz, M.G.; Muhuri, S.; Murakami, H.; Nandi, B.K.; Natal da Luz, H.; Nattrass, C.; Nayak, T.K.; Negrao De Oliveira, R.A.; Nicassio, M.; Nielsen, B.S.; Oláh, L.; Oskarsson, A.; Otwinowski, J.; Oyama, K.; Paić, G.; Patra, R.N.; Peskov, V.; Pikna, M.; Pinsky, L.; Planinic, M.; Poghosyan, M.G.; Poljak, N.; Pompei, F.; Prasad, S.K.; Pruneau, C.A.; Putschke, J.; Raha, S.; Rak, J.; Rasson, J.; Ratza, V.; Read, K.F.; Rehman, A.; Renfordt, R.; Richert, T.; Røed, K.; Röhrich, D.; Rudzki, T.; Sahoo, R.; Sahoo, S.; Sahu, P.K.; Saini, J.; Schaefer, B.; Schambach, J.; Scheid, S.; Schmidt, C.; Schmidt, H.R.; V Schmidt, N.; Schulte, H.; Schweda, K.; Selyuzhenkov, I.; Sharma, N.; Silvermyr, D.; Singaraju, R.N.; Sitar, B.; Smirnov, N.; Sorensen, S.P.; Sozzi, F.; Stachel, J.; Stenlund, E.; Strmen, P.; Szarka, I.; Tambave, G.; Terasaki, K.; Timmins, A.; Ullaland, K.; Utrobicic, A.; Varga, D.; Varma, R.; Velure, A.; Vislavicius, V.; Voloshin, S.; Voss, B.; Vranic, D.; Wiechula, J.; Winkler, S.; Wikne, J.; Windelband, B.; Zhao, C.

    A large Time Projection Chamber is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019/20, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 50 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivity to rare probes that are considered key observables to characterize the QCD matter created in such collisions. In order to make full use of this luminosity, the currently used gated Multi-Wire Proportional Chambers will be replaced. The upgrade relies on continuously operated readout detectors employing Gas Electron Multiplier technology to retain the performance in terms of particle identification via the measurement of the specific energy loss by ionization d$E$/d$x$. A full-size readout chamber prototype was assembled in 2014 featuring a stack of four GEM foils as an amplification stage. The performance of the pr...

  3. 'Lifecycle cost' management used in ITER project

    International Nuclear Information System (INIS)

    Xing Chao; Wu Fengfeng

    2013-01-01

    'Lifecycle cost' management is a new kind of management. The International Nuclear Fusion Energy Program was managing by 'lifecycle cost' method. The cost and other factors associated with cost were under control by the method. In the future, the system engineering method should be focused in engineering management, paying equal attention to both evaluation and management, and strengthening the application of information system in the cost management to effectively improve the management level. (authors)

  4. Emission Impacts of Electric Vehicles in the US Transportation Sector Following Optimistic Cost and Efficiency Projections.

    Science.gov (United States)

    Keshavarzmohammadian, Azadeh; Henze, Daven K; Milford, Jana B

    2017-06-20

    This study investigates emission impacts of introducing inexpensive and efficient electric vehicles into the US light duty vehicle (LDV) sector. Scenarios are explored using the ANSWER-MARKAL model with a modified version of the Environmental Protection Agency's (EPA) 9-region database. Modified cost and performance projections for LDV technologies are adapted from the National Research Council (2013) optimistic case. Under our optimistic scenario (OPT) we find 15% and 47% adoption of battery electric vehicles (BEVs) in 2030 and 2050, respectively. In contrast, gasoline vehicles (ICEVs) remain dominant through 2050 in the EPA reference case (BAU). Compared to BAU, OPT gives 16% and 36% reductions in LDV greenhouse gas (GHG) emissions for 2030 and 2050, respectively, corresponding to 5% and 9% reductions in economy-wide emissions. Total nitrogen oxides, volatile organic compounds, and SO 2 emissions are similar in the two scenarios due to intersectoral shifts. Moderate, economy-wide GHG fees have little effect on GHG emissions from the LDV sector but are more effective in the electricity sector. In the OPT scenario, estimated well-to-wheels GHG emissions from full-size BEVs with 100-mile range are 62 gCO 2 -e mi -1 in 2050, while those from full-size ICEVs are 121 gCO 2 -e mi -1 .

  5. Final Report for Project titled High Thermal Conductivity Polymer Composites for Low-Cost Heat Exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Thibaud-Erkey, Catherine [United Technologies reserach Center, East Hartford, CT (United States); Alahyari, Abbas [United Technologies reserach Center, East Hartford, CT (United States)

    2016-12-28

    Heat exchangers (HXs) are critical components in a wide range of heat transfer applications, from HVAC (Heating Ventilation and Cooling) to automobiles to manufacturing plants. They require materials capable of transferring heat at high rates while also minimizing thermal expansion over the usage temperature range. Conventionally, metals are used for applications where effective and efficient heat exchange is required, since many metals exhibit thermal conductivity over 100 W/m K. While metal HXs are constantly being improved, they still have some inherent drawbacks due to their metal construction, in particular corrosion. Polymeric material can offer solution to such durability issues and allow designs that cannot be afforded by metal construction either due to complexity or cost. A major drawback of polymeric material is their low thermal conductivity (0.1-0.5? W/mK) that would lead to large system size. Recent improvements in the area of filled polymers have highlighted the possibility to greatly improve the thermal conductivity of polymeric materials while retaining their inherent manufacturing advantage, and have been applied to heat sink applications. Therefore, the objective of this project was to develop a robust review of materials for the manufacturing of industrial and commercial non-metallic heat exchangers. This review consisted of material identification, literature evaluation, as well as empirical and model characterization, resulting in a database of relevant material properties and characteristics to provide guidance for future heat exchanger development.

  6. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  7. Who gains? allocation of freight transport user benefits from international infrastructure projects in multicountry cost-benefit analysis

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Kristensen, Niels Buus

    2005-01-01

    A public decision by several countries on whether to cofinance an international infrastructure project is the subject of a cost-benefit analysis (CBA). The CBA elements are broken out and analyzed for each country. The issue of freight user benefits is discussed, and results are derived from...

  8. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  9. A project of reuse of reclaimed wastewater in the Po Valley, Italy: Polishing sequence and cost benefit analysis

    Science.gov (United States)

    Verlicchi, P.; Al Aukidy, M.; Galletti, A.; Zambello, E.; Zanni, G.; Masotti, L.

    2012-04-01

    SummaryThe paper presents a study carried out in the environmentally sensitive area of the Po Valley in northern Italy, with the aim of evaluating, from technical and economic perspectives, a project to reuse part of the final effluent from the Ferrara wastewater treatment plant for irrigation and to develop the site for recreational purposes. Although this area features plentiful supplies of surface water, the Ministry of the Environment has declared it to be at risk of environmental crises due to eutrophication and the drought recurring over the last decade. Thus the availability of fresh water, particularly for agricultural purposes, is threatened, and prompt water saving and protection measures are required. Hence, the possibility of reusing reclaimed wastewater from this plant was investigated, with the aim of exploiting the space around the WWTP, situated within a large urban park, to install natural polishing treatment systems and create green spaces for recreational use. Based on experimental investigation on a pilot plant (featuring both natural and conventional treatments), the study outlines the rationale behind the treatment train selected for the project, details the initial and ongoing costs involved, evaluates the benefits deriving from the project, and assesses public acceptance of the project by the contingent valuation method. A cost-benefit analysis completes the study, and various economic indicators (net present value, benefit-cost ratio, pay-back period, and internal rate of return) revealed that the proposed project was financially feasible.

  10. A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2012-01-01

    Full Text Available The aim of this study is to deal with a minimum cost network flow problem (MCNFP in a large-scale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an expectation multiobjective bilevel programming model with chance constraints is formulated to incorporate decision makers’ preferences. To solve the identified special conditions, an equivalent crisp model is proposed with an additional multiobjective bilevel particle swarm optimization (MOBLPSO developed to solve the model. The Shuibuya Hydropower Project is used as a real-world example to verify the proposed approach. Results and analysis are presented to highlight the performances of the MOBLPSO, which is very effective and efficient compared to a genetic algorithm and a simulated annealing algorithm.

  11. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    Energy Technology Data Exchange (ETDEWEB)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  12. Projected Costs of U.S. Nuclear Forces, 2017 to 2026

    Science.gov (United States)

    2017-02-01

    amounts at roughly the same rates that costs for similar programs have grown in the past. Nuclear forces account for roughly 6 percent of the total 10...nuclear forces, some published estimates of the total costs of nuclear weapons account for the costs of several related activities. Examples include...based its estimate on historical costs of analogous programs. b. This category includes nuclear-related research and operations support activities by

  13. Cost, Schedule and Risk Management, The Building Blocks of a U.S. Nuclear Project

    International Nuclear Information System (INIS)

    Redding, John

    2002-01-01

    The most important consideration in the decision to build a new nuclear plant is the capital cost. Right? Yes and no. Yes, the capital cost accounts for 80% of the generation cost of a new plant. No, because there are other equally important considerations. (author)

  14. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  15. SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

    Energy Technology Data Exchange (ETDEWEB)

    GEUTHER J; CONRAD EA; RHOADARMER D

    2009-08-24

    The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

  16. SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

    International Nuclear Information System (INIS)

    Geuther, J.; Conrad, E.A.; Rhoadarmer, D.

    2009-01-01

    The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described

  17. Status of the R&D activities for the upgrade of the ALICE TPC

    Directory of Open Access Journals (Sweden)

    Deisting Alexander

    2018-01-01

    After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and dE/dx resolution compared to the performance of the present TPC. Since readout by multi-wire proportional chambers is no longer feasible with these requirements, new technologies have to be employed. In the new readout chambers the electron amplification is provided by a stack of four Gas ElectronMultiplier (GEM foils. Here foils with a standard hole pitch of 140 μm as well as large pitch foils (280 μm are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of σE/E ≤ 12% at the photopeak of 55Fe. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation at the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEMstack the discharge probability is kept at the level of 10-12 discharges per incoming hadron. An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN in the end of 2014 is shown. At this campaigns the stability against discharges and the dE/dx performance of a full size readout chamber prototype was tested. In addition it is reported on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.

  18. Transportation Infrastructure: Progress on and Challenges to Central Artery/Tunnel Project's Cost and Financing

    Science.gov (United States)

    1997-07-01

    The Central Artery/Tunnel project in Boston, Massachusetts--one of the largest, most complex, and most expensive highway construction projects ever undertaken--is well under way, with contracts worth nearly $8 billion either completed or awarded. Con...

  19. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  20. 50 CFR 84.49 - What if the project costs more or less than originally expected?

    Science.gov (United States)

    2010-10-01

    ... monies for approved coastal wetland grants will be subject to the entire review process along with new grants. Any monies left over after the project is complete, or if the project is not completed, should be...

  1. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  2. Analysis and evaluation of process and equipment in tasks 2 and 4 of the Low Cost Solar Array project

    Science.gov (United States)

    Goldman, H.; Wolf, M.

    1978-01-01

    Several experimental and projected Czochralski crystal growing process methods were studied and compared to available operations and cost-data of recent production Cz-pulling, in order to elucidate the role of the dominant cost contributing factors. From this analysis, it becomes apparent that substantial cost reductions can be realized from technical advancements which fall into four categories: an increase in furnace productivity; the reduction of crucible cost through use of the crucible for the equivalent of multiple state-of-the-art crystals; the combined effect of several smaller technical improvements; and a carry over effect of the expected availability of semiconductor grade polysilicon at greatly reduced prices. A format for techno-economic analysis of solar cell production processes was developed, called the University of Pennsylvania Process Characterization (UPPC) format. The accumulated Cz process data are presented.

  3. TPC2 polymorphisms associated with a hair pigmentation phenotype in humans result in gain of channel function by independent mechanisms.

    Science.gov (United States)

    Chao, Yu-Kai; Schludi, Verena; Chen, Cheng-Chang; Butz, Elisabeth; Nguyen, O N Phuong; Müller, Martin; Krüger, Jens; Kammerbauer, Claudia; Ben-Johny, Manu; Vollmar, Angelika M; Berking, Carola; Biel, Martin; Wahl-Schott, Christian A; Grimm, Christian

    2017-10-10

    Two-pore channels (TPCs) are endolysosomal cation channels. Two members exist in humans, TPC1 and TPC2. Functional roles associated with the ubiquitously expressed TPCs include VEGF-induced neoangiogenesis, LDL-cholesterol trafficking and degradation, physical endurance under fasting conditions, autophagy regulation, the acrosome reaction in sperm, cancer cell migration, and intracellular trafficking of pathogens such as Ebola virus or bacterial toxins (e.g., cholera toxin). In a genome-wide association study for variants associated with human pigmentation characteristics two coding variants of TPC2, rs35264875 (encoding M484L) and rs3829241 (encoding G734E), have been found to be associated with a shift from brown to blond hair color. In two recent follow-up studies a role for TPC2 in pigmentation has been further confirmed. However, these human polymorphic variants have not been functionally characterized until now. The development of endolysosomal patch-clamp techniques has made it possible to investigate directly ion channel activities and characteristics in isolated endolysosomal organelles. We applied this technique here to scrutinize channel characteristics of the polymorphic TPC2 variants in direct comparison with WT. We found that both polymorphisms lead to a gain of channel function by independent mechanisms. We next conducted a clinical study with more than 100 blond- and brown/black-haired individuals. We performed a genotype/phenotype analysis and subsequently isolated fibroblasts from WT and polymorphic variant carriers for endolysosomal patch-clamp experimentation to confirm key in vitro findings.

  4. 75 FR 48365 - Solicitation for a Cooperative Agreement-NIC Cost Containment Online Resource Center Project

    Science.gov (United States)

    2010-08-10

    ..., or design aspects proposed that will enhance the project? Organizational (35%) Does the proposed..., organization, individual or team have the organizational capacity to complete the project tasks? Are the... there a reasonable justification for their inclusion in the project and a clear structure to ensure...

  5. Measurement of magnetic and electric field inhomogenities in a time projection chamber using laser tracks

    International Nuclear Information System (INIS)

    Benetta, M.; Froberger, J.P.; Lehraus, I.; Mathewson, R.; May, J.; Price, M.; Schlater, D.; Tejessi, W.; Witzeling, W.

    1985-01-01

    The large time projection chambers (TPC) for particle track measurements have their electric drift field parallel to the magnetic field which is needed for the momentum measurement of the particles. Small field inhomogeneities of the order of epsilon times the main field cause large track distortions (coordinate displacements) of the order of epsilon times the driftlength. It is therefore important for every TPC to know the inhomogeneities very well. Laser rays have proven to be useful to study them. We report here on our experience with a TPC having a maximum drift length of 1.3 m

  6. Development of time projection chamber for precise neutron lifetime measurement using pulsed cold neutron beams

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, Y. [High Energy Accelerator Research Organization, Ibaraki (Japan); Higashi, N. [Graduate School of Science, University of Tokyo, Tokyo (Japan); Igarashi, Y. [High Energy Accelerator Research Organization, Ibaraki (Japan); Iwashita, Y. [Institute for Chemical Research, Kyoto University, Kyoto (Japan); Ino, T. [High Energy Accelerator Research Organization, Ibaraki (Japan); Katayama, R. [Graduate School of Science, University of Tokyo, Tokyo (Japan); Kitaguchi, M. [Kobayashi-Maskawa Institute, Nagoya University, Aichi (Japan); Kitahara, R. [Graduate School of Science, Kyoto University, Kyoto (Japan); Matsumura, H.; Mishima, K. [High Energy Accelerator Research Organization, Ibaraki (Japan); Nagakura, N.; Oide, H. [Graduate School of Science, University of Tokyo, Tokyo (Japan); Otono, H., E-mail: otono@phys.kyushu-u.ac.jp [Research Centre for Advanced Particle Physics, Kyushu University, Fukuoka (Japan); Sakakibara, R. [Department of Physics, Nagoya University, Aichi (Japan); Shima, T. [Research Center for Nuclear Physics, Osaka University, Osaka (Japan); Shimizu, H.M.; Sugino, T. [Department of Physics, Nagoya University, Aichi (Japan); Sumi, N. [Faculty of Sciences, Kyushu University, Fukuoka (Japan); Sumino, H. [Department of Basic Science, University of Tokyo, Tokyo (Japan); Taketani, K. [High Energy Accelerator Research Organization, Ibaraki (Japan); and others

    2015-11-01

    A new time projection chamber (TPC) was developed for neutron lifetime measurement using a pulsed cold neutron spallation source at the Japan Proton Accelerator Research Complex (J-PARC). Managing considerable background events from natural sources and the beam radioactivity is a challenging aspect of this measurement. To overcome this problem, the developed TPC has unprecedented features such as the use of polyether-ether-ketone plates in the support structure and internal surfaces covered with {sup 6}Li-enriched tiles to absorb outlier neutrons. In this paper, the design and performance of the new TPC are reported in detail.

  7. Quality assurance of GEM foils in the framework of the TPC upgrade in the ALICE experiment

    CERN Document Server

    Ozcelik, Melih Arslan

    2016-01-01

    In the framework of the TPC upgrade of the ALICE Experiment, new readout chambers will be installed during the LHC long shutdown 2, which is scheduled to start in July 2018. The current MWPCs (Multi Wire Proportional Chambers) will be replaced by readout chambers consisting of GEM (Gas Electron Multipliers) foils in order to meet the increasing readout rate requirements. QA (Quality Assurance) tests on the GEMs are performed to classify the foils. In this report we present the work done during the CERN Summer Student Programme 2016.

  8. {sup 11}C- and {sup 18}F Production at TPC RK2 Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Solin, O.; Johansson, S.; Eriksson, P-O.; Rajander, J.; Kokkomäki, E.; Helin, S.; Arponen, E.; Aromaa, J.; Savisto, N.; Bergman, J.; Heselius, S-J. [Turku PET Centre, Radiopharmaceutical Chemistry Laboratory and Accelerator Laboratory, Porthaninkatu 3, 20500 Turku (Finland)

    2009-07-01

    Four gas targets for production of [{sup 11}C]CO{sub 2} and [{sup 11}C]CH{sub 4} as well as static and one circulating water target for [{sup 18}F]fluoride production have been installed on the external beam line of the CC18/9 cyclotron (Efremov Institute for Electrophysical Apparatuses, St. Petersburg, Russia) at TPC. The cyclotron is capable of accelerating 18 MeV protons (9 MeV deuterons) at particle beam intensities in excess of 100 μA. The aim with these radionuclide production systems is high yield, high specific radioactivity precursor production for PET radiopharmaceuticals.

  9. Process to process communication over Fastbus in the data acquisition system of the ALEPH TPC

    International Nuclear Information System (INIS)

    Lusiani, A.

    1994-01-01

    The data acquisition system of the ALEPH TPC includes a VAX/VMS computer cluster and 36 intelligent Fastbus modules (ALEPH TPPS) running the OS9 multitasking real-time operating system. Dedicated software has been written in order to reliably exchange information over Fastbus between the VAX/VMS cluster and the 36 TPPs to initialize and co-ordinate the microprocessors, and to monitor and debug their operation. The functionality and the performance of this software will be presented together with an overview of the application that rely on it

  10. Operation of a LAr-TPC equipped with a multilayer LEM charge readout

    Science.gov (United States)

    Baibussinov, B.; Centro, S.; Farnese, C.; Fava, A.; Gibin, D.; Guglielmi, A.; Meng, G.; Pietropaolo, F.; Varanini, F.; Ventura, S.; Zatrimaylov, K.

    2018-03-01

    A novel detector for ionization signals in a single phase LAr-TPC has been experimented in the ICARINO test facility at the INFN Laboratories in Legnaro. It is based on the adoption of a multilayer Large Electron Multiplier (LEM) replacing the traditional anodic wire arrays. Cosmic muon tracks were detected allowing the measurement of energy deposition and a first determination of the signal to noise ratio. The analysis of the recorded events demonstrated the 3D reconstruction capability of this device for ionizing events in liquid Argon. The collected fraction of ionization charge is close to about 90%, with signal to noise ratio similar to that measured with more traditional wire chambers.

  11. A Continuously Running High-Rate GEM-TPC for P-bar ANDA

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, F.V., E-mail: felix.valentin.boehmer@cern.ch [Technische Universitaet Muenchen Physik Department, James-Franck-Strasse, 85748 Garching (Germany); Angerer, H.; Dorheim, S.; Hoeppner, C.; Ketzer, B.; Konorov, I.; Neubert, S.; Paul, S.; Vandenbroucke, M.; Zhang, X. [Technische Universitaet Muenchen Physik Department, James-Franck-Strasse, 85748 Garching (Germany); Berger, M.; Cusanno, F.; Fabbietti, L.; Lalik, R. [Excellence Cluster Universe, Muenchen (Germany); Beck, R.; Kaiser, D.; Lang, M.; Schmitz, R.; Walther, D.; Winnebeck, A. [Helmholtz-Institut fuer Strahlen- und Kernphysik, Bonn (Germany)

    2011-06-15

    The P-bar ANDA fixed target experiment planned at FAIR will investigate fundamental questions of non-perturbative QCD. It makes use of a cooled antiproton beam (momentum: 1.5 to 15GeV/c) and will reach luminosities of up to 2.10{sup 32}cm{sup -2}s{sup -1}, yielding a p-bar p-annihilation rate of 2.10{sup 7}s{sup -1}. One option for the central tracker of P-bar ANDA is a cylindrical, ungated, continuously running TPC with GEM-based gas amplification stage.

  12. A Continuously Running High-Rate GEM-TPC for P-bar ANDA

    International Nuclear Information System (INIS)

    Boehmer, F.V.; Angerer, H.; Dorheim, S.; Hoeppner, C.; Ketzer, B.; Konorov, I.; Neubert, S.; Paul, S.; Vandenbroucke, M.; Zhang, X.; Berger, M.; Cusanno, F.; Fabbietti, L.; Lalik, R.; Beck, R.; Kaiser, D.; Lang, M.; Schmitz, R.; Walther, D.; Winnebeck, A.

    2011-01-01

    The P-bar ANDA fixed target experiment planned at FAIR will investigate fundamental questions of non-perturbative QCD. It makes use of a cooled antiproton beam (momentum: 1.5 to 15GeV/c) and will reach luminosities of up to 2.10 32 cm -2 s -1 , yielding a p-bar p-annihilation rate of 2.10 7 s -1 . One option for the central tracker of P-bar ANDA is a cylindrical, ungated, continuously running TPC with GEM-based gas amplification stage.

  13. τ physics using the TPC/2γ facility at HiLum PEP

    International Nuclear Information System (INIS)

    Bloom, E.D.

    1991-01-01

    Plans for a TPC/2γ facility program using HiLum PEP for τ physics are presented. The detector and its performance are described in some detail. The possibilities for a τ physics program with an integrated luminosity of 1 fb -1 are discussed. The physics issues are reviewed, particularly the τ'1-prong' problem, and preliminary results on τ → ν τ K +- X + X - + ≥ 0 Neutrals are shown. The performance of HiLum PEP is also presented, and expectations for the future are discussed. (R.P.) 15 refs., 14 figs., 3 tabs

  14. National energy cost optimization and project implementation: Two different worlds?. Discussion paper in the framework of the UNEP Greenhouse Gas Abatement Costing Studies

    International Nuclear Information System (INIS)

    Van Harmelen, T.

    1994-08-01

    One of the main targets of the UNEP Greenhouse Gas Abatement Costing Study is combining the techno-economic and purely economic modelling approaches into one overall modelling methodology for greenhouse gas abatement costing studies. This type of models can be categorized as bottom-up models, since technology data on a very detailed level result in costs and emissions on a national level. In contrast with, but not necessarily in conflict with these models, macro-economists rely in general on macro-economic models which derive economic projections from aggregated national and sectorial economic data. These so called top-down models describe the complete national economy. Therefore the energy sector is modelled in a very aggregated way. Since the micro-economic and techno-economic approaches can be classified both as bottom-up approaches, it could be expected that mutual understanding exists. However, this is not true for all issues in this field. Techno-economical views and micro-economic views differ for instance on the implementation of options. This topic drew attention during the UNEP study, next to other items as techno-economic and macro-economic model assessments of the costs of CO 2 abatement. One of the most important implementation issues is the so-called negative cost (benefit) potential of energy saving options, which exists in the techno-economic view at this very moment, but which is not implemented yet. In the view of micro-economic analysis this potential does not exist, since options which are profitable would have been implemented according to presently adopted cost-benefit theory. Several aspects of this controversy have been discussed extensively elsewhere. In this paper the two visions are summarized and it is discussed whether it is fruitful to combine techno-economic and micro-economic approaches in an overall methodological framework. 1 tabs., 8 refs

  15. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    International Nuclear Information System (INIS)

    Tomes, John J; Finlayson, Chris E

    2016-01-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values. (paper)

  16. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    Science.gov (United States)

    Tomes, John J.; Finlayson, Chris E.

    2016-09-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values.

  17. Projected costs for mined geologic repositories for dispoal of commercial nuclear wastes

    International Nuclear Information System (INIS)

    Waddell, J.D.; Dippold, D.G.; McSweeney, T.I.

    1982-12-01

    This documen reports cost estimates for: (1) the exploration and development activities preceding the final design of terminal isolation facilities for disposal of commercial high-level waste; and (2) the design, construction, operation, and decommissioning of such facilities. Exploration and evelopment costs also include a separate cost category for related programs such as subseabed research, activities of the Transportation Technology Center, and waste disposal impact mitigation activities

  18. Summary of cost projection for regulatory uncertainties in the back end of the fuel cycle

    International Nuclear Information System (INIS)

    Raudenbush, M.H.; Geller, L.

    1977-01-01

    Fuel recycle cost deviations resulting from regulatory changes in the back end of the fuel cycle are examined from a number of different data sources, and three potentially large cost uncertainties are identified; HLW disposal, alpha-waste criteria, and in-plant material control/accountability for safeguards. Present and past methods of regulatory cost effectiveness determinations are critiqued and in some cases found wanting

  19. Method of levelized discounted costs applied in economic evaluation of nuclear power plant project

    International Nuclear Information System (INIS)

    Tian Li; Wang Yongqing; Liu Jingquan; Guo Jilin; Liu Wei

    2000-01-01

    The main methods of economic evaluation of bid which are in common use are introduced. The characteristics of levelized discounted cost method and its application are presented. The method of levelized discounted cost is applied to the cost calculation of a 200 MW nuclear heating reactor economic evaluation. The results indicate that the method of levelized discounted costs is simple, feasible and which is considered most suitable for the economic evaluation of various case. The method is suggested which is used in the national economic evaluation

  20. Basic Research about Calculation of the Decommissioning Unit Cost based on The KRR-2 Decommissioning Project

    International Nuclear Information System (INIS)

    Song, Chan-Ho; Park, Hee-Seong; Ha, Jea-Hyun; Jin, Hyung-Gon; Park, Seung-Kook

    2015-01-01

    The KAERI be used to calculate the decommissioning cost and manage the data of decommissioning activity experience through systems such as the decommissioning information management system (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), decommissioning work-unit productivity calculation system (DEWOCS). Some country such as Japan and The United States have the information for decommissioning experience of the NPP and publish reports on decommissioning cost analysis. These reports as valuable data be used to compare with the decommissioning unit cost. In particular, need a method to estimate the decommissioning cost of the NPP because there is no decommissioning experience of NPP in case of Korea. makes possible to predict the more precise prediction about the decommissioning unit cost. But still, there are many differences on calculation for the decommissioning unit cost in domestic and foreign country. Typically, it is difficult to compare with data because published not detailed reports. Therefore, field of estimation for decommissioning cost have to use a unified framework in order to the decommissioning cost be provided to exact of the decommissioning cost