  1. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  2. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  3. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  4. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  5. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  6. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  7. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  8. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  9. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  10. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  11. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  12. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  13. F-15 837 IFCS Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John T.

    2007-01-01

    This viewgraph presentation reviews the use of Intelligent Flight Control System (IFCS) for the F-15. The goals of the project are: (1) Demonstrate Revolutionary Control Approaches that can Efficiently Optimize Aircraft Performance in both Normal and Failure Conditions (2) Advance Neural Network-Based Flight Control Technology for New Aerospace Systems Designs. The motivation for the development are to reduce the chance and skill required for survival.

  14. [Project summarize of "reestablishing disease prevention and control system of China"].

    Science.gov (United States)

    Hao, Mo; Yu, Jingjin; Yu, Mingzhu; Duan, Yong

    2005-01-01

    This paper introduced the project of "reestablishing the disease control and prevention system of China" in brief, including background, objectives, funding resources, researching objects and sampling methods. This project which funded by National Outstanding Younger Fund and the research fund of MOH aimed at nailing down the key problem existed in disease control and prevention system of China, demonstrating the reasons and mechanism of key problem, developing feasible policy idea and strategy. This paper also introduced some issues concerning the reestablishing of the disease control and prevention system of China: the definition of public function, the standard of human resource allocation and the standard of financing. The Centers for Disease Control and Prevention in 8 provinces, 80 cities and 80 counties have been sampled to provide information that project needed. In addition, this project also cited some data which come from the early study, in which 3 provinces, 12 counties, 49 towns, 179 villages and 9781 rural families have been sampled and investigated.

  15. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  16. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  17. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  18. Adaptive Control and Function Projective Synchronization in 2D Discrete-Time Chaotic Systems

    International Nuclear Information System (INIS)

    Li Yin; Chen Yong; Li Biao

    2009-01-01

    This study addresses the adaptive control and function projective synchronization problems between 2D Rulkov discrete-time system and Network discrete-time system. Based on backstepping design with three controllers, a systematic, concrete and automatic scheme is developed to investigate the function projective synchronization of discrete-time chaotic systems. In addition, the adaptive control function is applied to achieve the state synchronization of two discrete-time systems. Numerical results demonstrate the effectiveness of the proposed control scheme.

  19. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  20. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    The main intention of this paper is to present feedback from the implementation of the new Turbine Control System (TCS) replacement project at Nuclear Power Plant (NPP) NEK - Krsko. From the plant construction time and the first plant start-up in 1981, the NPP NEK TG (Turbine-Generator) set was controlled and monitored by DEH (Digital Electro Hydraulic) Mod II Control System designed in 70's based on P2500 CPU and number of I/O controllers and modules. The P2500 CPU and associated controllers were built with discrete TTL components (TTL logic chips) and the P2500 CPU had 64k of 16 bit words of ferrite core memory. For that time, DEH Mod II had sophisticated MCR (Main Control Room) HMI (Human Machine Interface) based on digital functional keyboards, one alphanumeric black and white CRT monitor and printer. After twenty eight years of operation and because of several other reasons that are explained in the paper, NEK decided to replace the old DEH Mod II Control system with the new Emerson Ovation based DCS (Distributed Control System) on redundant platform for the control and monitoring of secondary plant systems in the NPP Krsko (NEK), and the new system was named PDEH (Programmable Digital Electro Hydraulic) TCS. In May 2007, NEK signed the turn-key contract with Westinghouse Electric Company (WEC) for the project of replacement of the TCS, Turbine Emergency Trip System (ETS), Moisture Separator Reheater (MSR) control and some other control and monitoring functions. WEC subcontracted a number of other companies for equipment delivery, AE (Architect Engineering Design) activities, specific software development tasks (changes of KFSS - Krsko Full Scope Simulator and PIS - Process Information System interface) and field installation activities. The subject project enveloped implementation of PDEH system on three application platforms: BG KFSS (Background KFSS), FG KFSS (Foreground KFSS) and PDEH system installed in the plant. The HMI for the BG KFSS platform

  1. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  2. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  3. Optimal control of quantum systems: a projection approach

    International Nuclear Information System (INIS)

    Cheng, C.-J.; Hwang, C.-C.; Liao, T.-L.; Chou, G.-L.

    2005-01-01

    This paper considers the optimal control of quantum systems. The controlled quantum systems are described by the probability-density-matrix-based Liouville-von Neumann equation. Using projection operators, the states of the quantum system are decomposed into two sub-spaces, namely the 'main state' space and the 'remaining state' space. Since the control energy is limited, a solution for optimizing the external control force is proposed in which the main state is brought to the desired main state at a certain target time, while the population of the remaining state is simultaneously suppressed in order to diminish its effects on the final population of the main state. The optimization problem is formulated by maximizing a general cost functional of states and control force. An efficient algorithm is developed to solve the optimization problem. Finally, using the hydrogen fluoride (HF) molecular population transfer problem as an illustrative example, the effectiveness of the proposed scheme for a quantum system initially in a mixed state or in a pure state is investigated through numerical simulations

  4. Some principles of automated control systems construction with project organizational structure

    OpenAIRE

    Kovalenko, Ihor I.; Puhachenko, Kateryna S.

    2013-01-01

    The main principles of automated control systems construction with project organizational structures have been considered and the process flow sheet  for organizational systems control has been proposed. The architectural elements of the organizational system have been introduced and described. The instrumental tools of the graphodynamic systems theory have been used for the simulation modeling of hierarchical structures.

  5. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  6. Projective Synchronization of Chaotic Discrete Dynamical Systems via Linear State Error Feedback Control

    Directory of Open Access Journals (Sweden)

    Baogui Xin

    2015-04-01

    Full Text Available A projective synchronization scheme for a kind of n-dimensional discrete dynamical system is proposed by means of a linear feedback control technique. The scheme consists of master and slave discrete dynamical systems coupled by linear state error variables. A kind of novel 3-D chaotic discrete system is constructed, to which the test for chaos is applied. By using the stability principles of an upper or lower triangular matrix, two controllers for achieving projective synchronization are designed and illustrated with the novel systems. Lastly some numerical simulations are employed to validate the effectiveness of the proposed projective synchronization scheme.

  7. Overview and status of the prototype project for Wendelstein 7-X control system

    Energy Technology Data Exchange (ETDEWEB)

    Schacht, Joerg [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)], E-mail: joerg.schacht@ipp.mpg.de; Bluhm, Torsten; Herbst, Uwe; Hennig, Christine; Heinrich, Stefan; Kuehner, Georg; Koester, Erik; Laqua, Heike; Lewerentz, Marc; Marquardt, Mirco; Meyer, Christiane; Mueller, Ina; Pingel, Steffen; Sachtleben, Juergen; Spring, Anett; Werner, Andreas; Woelk, Andreas [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)

    2009-06-15

    This contribution gives an overview of the project 'Prototype W7-X control system'. The objective of this prototype project is to demonstrate the applicability of the segment orientated control system at a running fusion experiment including steady-state operation, interaction of all relevant components, real time control, data acquisition and on-line data analysis. Furthermore, the W7-X safety concept will be implemented at WEGA and tested.

  8. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  9. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  10. Projective Synchronization in Modulated Time-Delayed Chaotic Systems Using an Active Control Approach

    International Nuclear Information System (INIS)

    Feng Cun-Fang; Wang Ying-Hai

    2011-01-01

    Projective synchronization in modulated time-delayed systems is studied by applying an active control method. Based on the Lyapunov asymptotical stability theorem, the controller and sufficient condition for projective synchronization are calculated analytically. We give a general method with which we can achieve projective synchronization in modulated time-delayed chaotic systems. This method allows us to adjust the desired scaling factor arbitrarily. The effectiveness of our method is confirmed by using the famous delay-differential equations related to optical bistable or hybrid optical bistable devices. Numerical simulations fully support the analytical approach. (general)

  11. Projective Synchronization of N-Dimensional Chaotic Fractional-Order Systems via Linear State Error Feedback Control

    Directory of Open Access Journals (Sweden)

    Baogui Xin

    2012-01-01

    Full Text Available Based on linear feedback control technique, a projective synchronization scheme of N-dimensional chaotic fractional-order systems is proposed, which consists of master and slave fractional-order financial systems coupled by linear state error variables. It is shown that the slave system can be projectively synchronized with the master system constructed by state transformation. Based on the stability theory of linear fractional order systems, a suitable controller for achieving synchronization is designed. The given scheme is applied to achieve projective synchronization of chaotic fractional-order financial systems. Numerical simulations are given to verify the effectiveness of the proposed projective synchronization scheme.

  12. Concepts, Operations, and Feasibility of a Projection-Based Variation Control System

    DEFF Research Database (Denmark)

    Stanciulescu, Stefan; Berger, Thorsten; Walkingshaw, Eric

    2016-01-01

    on a subset of all variants could ease the engineering of highly configurable software. We investigate the potential of one kind of such tools: projection-based variation control systems. For such systems we aim to understand: (i) what end-user operations they need to support, and (ii) whether they can...... realize the actual evolution of real-world, highly configurable software. We conduct an experiment that investigates variability-related evolution patterns and that evaluates the feasibility of a projection-based variation control system by replaying parts of the history of a highly configurable real......Highly configurable software often uses preproces- sor annotations to handle variability. However, understanding, maintaining, and evolving code with such annotations is difficult, mainly because a developer has to work with all variants at a time. Dedicated methods and tools that allow working...

  13. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  14. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  15. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  16. Control of the formation of projective synchronisation in lower-dimensional discrete-time systems

    International Nuclear Information System (INIS)

    Chee, C.Y.; Xu Daolin

    2003-01-01

    Projective synchronisation was recently observed in partially linear discrete-time systems. The scaling factor that characterises the behaviour of projective synchronisation is however unpredictable. In order to manipulate the ultimate state of the synchronisation, a control algorithm based on Schur-Chon stability criteria is proposed to direct the scaling factor onto any predestined value. In the numerical experiment, we illustrate the application on two chaotic discrete-time systems

  17. Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McNeece, S.G.; Truitt, R.W.

    1994-01-01

    The system requirements specification for SY-101 hydrogen mitigation test project (HMTP) data acquisition and control system (DACS-1) documents the system requirements for the DACS-1 project. The purpose of the DACS is to provide data acquisition and control capabilities for the hydrogen mitigation testing of Tank SY-101. Mitigation testing uses a pump immersed in the waste, directed at varying angles and operated at different speeds and time durations. Tank and supporting instrumentation is brought into the DACS to monitor the status of the tank and to provide information on the effectiveness of the mitigation test. Instrumentation is also provided for closed loop control of the pump operation. DACS is also capable for being expanded to control and monitor other mitigation testing. The intended audience for the computer system requirements specification includes the SY-101 hydrogen mitigation test data acquisition and control system designers: analysts, programmers, instrument engineers, operators, maintainers. It is intended for the data users: tank farm operations, mitigation test engineers, the Test Review Group (TRG), data management support staff, data analysis, Hanford data stewards, and external reviewers

  18. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  19. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  20. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  1. Project of the JINR heavy ion synchrotron on-line control system

    International Nuclear Information System (INIS)

    Glejbman, Eh.M.; Zhabitskij, V.M.; Ivanov, I.N.

    1983-01-01

    Description of the project of the JINR heavy ion synchrotron (HIS) on-line control system (OCS) which is a strong-focusing synchrotron designed for avarage energies, is given. Complete average stream of data from HIS constitutes approximately 500 byte/s, when operation cycle is 0.33 s. The structure of HIS OCS is a two-hierarchy system with the distributed processing and control, built using modular principle. The first, lower hierarchy level forms eight subsystems, each of them is oriented for automation of concrete functionally-technological system of the accelerator. The higher hierarchy is the central complex computer which is a multimicroprocessor computer. The hardware of HIS OCS is envisaged to be realized on the base of CAMAC moduls. HIS OCS software will be disigned as the SM computer specialized real-time system supplemented with applied programs and language interpreter for the accelerator control

  2. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  3. Application of point system in the project control of Ling'ao Nuclear Power Station

    International Nuclear Information System (INIS)

    Xie ahai

    2005-01-01

    Schedule control and cost control are very complicated issues even we set up the detail schedules and engineering measurements requirements for erection of a nuclear power project. In order to solve these problems, a Point System is used in Ling Ao (LA) Nuclear Power Project. This paper introduces the method. The Point System is a measurement system of workload. The measurement unit of any erection works is a Point only. A Point of workload is defined as the equivalent measurement quantities, which could be completed by a relevant skill worker within an hour. A set of procedure manuals for different installations has been set up. The calculation models of equipment installation, piping, cabling are addressed for example in the paper. The application of the Point System in the schedule control is shown in the paper. The following issues are highlighted: to define the duration of a piping activity in the Project Level 2 Schedule, to draught the curves of Point Schedules for different erection fields, to analyze the productive efficiency, to define erection quota of each month for different erection teams, to follow up the erection progress on site. The application of the Point System in the payment of erection contract is outlined. The calculation formula of a monthly payment is given. The advantage of the payment calculation method is discussed, for example, more accurate, very easy and clearly to check the measurement quantities completed on site, to control lump-sum cost. (authors)

  4. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  5. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study

    Science.gov (United States)

    1982-01-01

    The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.

  6. Incoherent control of locally controllable quantum systems

    International Nuclear Information System (INIS)

    Dong Daoyi; Zhang Chenbin; Rabitz, Herschel; Pechen, Alexander; Tarn, T.-J.

    2008-01-01

    An incoherent control scheme for state control of locally controllable quantum systems is proposed. This scheme includes three steps: (1) amplitude amplification of the initial state by a suitable unitary transformation, (2) projective measurement of the amplified state, and (3) final optimization by a unitary controlled transformation. The first step increases the amplitudes of some desired eigenstates and the corresponding probability of observing these eigenstates, the second step projects, with high probability, the amplified state into a desired eigenstate, and the last step steers this eigenstate into the target state. Within this scheme, two control algorithms are presented for two classes of quantum systems. As an example, the incoherent control scheme is applied to the control of a hydrogen atom by an external field. The results support the suggestion that projective measurements can serve as an effective control and local controllability information can be used to design control laws for quantum systems. Thus, this scheme establishes a subtle connection between control design and controllability analysis of quantum systems and provides an effective engineering approach in controlling quantum systems with partial controllability information.

  7. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  8. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry

    2010-01-01

    The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input

  9. Integrated computer control system CORBA-based simulator FY98 LDRD project final summary report

    International Nuclear Information System (INIS)

    Bryant, R M; Holloway, F W; Van Arsdall, P J.

    1999-01-01

    The CORBA-based Simulator was a Laboratory Directed Research and Development (LDRD) project that applied simulation techniques to explore critical questions about distributed control architecture. The simulator project used a three-prong approach comprised of a study of object-oriented distribution tools, computer network modeling, and simulation of key control system scenarios. This summary report highlights the findings of the team and provides the architectural context of the study. For the last several years LLNL has been developing the Integrated Computer Control System (ICCS), which is an abstract object-oriented software framework for constructing distributed systems. The framework is capable of implementing large event-driven control systems for mission-critical facilities such as the National Ignition Facility (NIF). Tools developed in this project were applied to the NIF example architecture in order to gain experience with a complex system and derive immediate benefits from this LDRD. The ICCS integrates data acquisition and control hardware with a supervisory system, and reduces the amount of new coding and testing necessary by providing prebuilt components that can be reused and extended to accommodate specific additional requirements. The framework integrates control point hardware with a supervisory system by providing the services needed for distributed control such as database persistence, system start-up and configuration, graphical user interface, status monitoring, event logging, scripting language, alert management, and access control. The design is interoperable among computers of different kinds and provides plug-in software connections by leveraging a common object request brokering architecture (CORBA) to transparently distribute software objects across the network of computers. Because object broker distribution applied to control systems is relatively new and its inherent performance is roughly threefold less than traditional point

  10. Redox phenomena controlling systems - a 7. framework programme collaborative project (2008-2012)

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of this EURATOM collaborative project is to understand Redox phenomena controlling the long-term release/retention of radionuclides (ReCosy programme) in nuclear waste disposal and to provide tools to apply the results to safety assessment. The project has been organized into 6 task forces: 1) implications of Redox for safety, 2) development of Redox determination methods, 3) Redox response of defined and near-natural systems, 4) Redox reactions of radionuclides, 5) Redox processes in radionuclide transport, and 6) Redox reactions affecting the spent fuel source-term

  11. Management system for the control of the Educative Project in the Higher Cuban Education

    Directory of Open Access Journals (Sweden)

    Lionel Rodolfo Baquero Hernández

    2016-06-01

    Full Text Available As part of the training of Cuban university students involved educational project that requires proper control of compliance. At the University of Information Science, is done through a digital model developed by the professor of the group which generates poor control and directly undermines the quality of the process. In this work the solution to the problem as basis of computerization, using OpenUP development methodology, programming language Java Script on the NetBeans platform version 8.0 as Integrated Development Environment, with ExtJS 3.4 framework is detailed, with version 8.0 of the Software Engineering tools Computer Assisted Visual Paradigm for modeling and PostgreSQL 9.3 as a management system database. The system also generates the associated compliance status of the activities that make up the educational project of a group, which facilitates the control and decision making reports.

  12. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  13. Chaos control and generalized projective synchronization of heavy symmetric chaotic gyroscope systems via Gaussian radial basis adaptive variable structure control

    International Nuclear Information System (INIS)

    Farivar, Faezeh; Aliyari Shoorehdeli, Mahdi; Nekoui, Mohammad Ali; Teshnehlab, Mohammad

    2012-01-01

    Highlights: ► A systematic procedure for GPS of unknown heavy chaotic gyroscope systems. ► Proposed methods are based on Lyapunov stability theory. ► Without calculating Lyapunov exponents and Eigen values of the Jacobian matrix. ► Capable to extend for a variety of chaotic systems. ► Useful for practical applications in the future. - Abstract: This paper proposes the chaos control and the generalized projective synchronization methods for heavy symmetric gyroscope systems via Gaussian radial basis adaptive variable structure control. Because of the nonlinear terms of the gyroscope system, the system exhibits chaotic motions. Occasionally, the extreme sensitivity to initial states in a system operating in chaotic mode can be very destructive to the system because of unpredictable behavior. In order to improve the performance of a dynamic system or avoid the chaotic phenomena, it is necessary to control a chaotic system with a periodic motion beneficial for working with a particular condition. As chaotic signals are usually broadband and noise like, synchronized chaotic systems can be used as cipher generators for secure communication. This paper presents chaos synchronization of two identical chaotic motions of symmetric gyroscopes. In this paper, the switching surfaces are adopted to ensure the stability of the error dynamics in variable structure control. Using the neural variable structure control technique, control laws are established which guarantees the chaos control and the generalized projective synchronization of unknown gyroscope systems. In the neural variable structure control, Gaussian radial basis functions are utilized to on-line estimate the system dynamic functions. Also, the adaptation laws of the on-line estimator are derived in the sense of Lyapunov function. Thus, the unknown gyro systems can be guaranteed to be asymptotically stable. Also, the proposed method can achieve the control objectives. Numerical simulations are presented to

  14. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  15. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  16. Greenidge Multi-Pollutant Control Project

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel

    2008-10-18

    The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including

  17. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    International Nuclear Information System (INIS)

    Xu Yuhua; Zhou Wuneng; Fang Jianan

    2009-01-01

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  18. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    Energy Technology Data Exchange (ETDEWEB)

    Xu Yuhua [College of Information Science and Technology, Donghua University, Shanghai 201620 (China) and Department of Maths, Yunyang Teacher' s College, Hubei 442000 (China)], E-mail: yuhuaxu2004@163.com; Zhou Wuneng [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)], E-mail: wnzhou@163.com; Fang Jianan [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)

    2009-11-15

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  19. Regulatory issues of digital instrumentation and control system in Lungmen project

    International Nuclear Information System (INIS)

    Chuang, C.F.; Chou, H.P.

    2004-01-01

    The Lungmen Nuclear Power Station (LNPS) is currently under construction in Taiwan, which consists of 2 advanced boiling water reactor (ABWR) units. The instrumentation and control (IC) systems of the LNPS are based on the state-of-the-art modernized fully integrated digital design. These IC systems possess many advantages and distinguished features comparing to traditional analog IC systems, they enjoy set-point stability, self-diagnostic and automatic testing ability, fault tolerance and avoidance, low power requirements, data handling and storage capability, as well as enhanced human-machine interfaces. This paper presents regulatory overviews, regulatory requirements, current major regulatory issues, as well as the areas of regulatory concerns and the lessons learned on the digital IC systems in the Lungmen Project

  20. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  1. Communication network structure parameters and new knowledge generation capabilities in companies engaged in industry control system engineering projects

    Directory of Open Access Journals (Sweden)

    Titov Sergei

    2016-01-01

    Full Text Available Engineering companies engaged in business of industry control systems need to manage the processes of generation of innovations within and across their projects. Generation and diffusion of innovations materialize through the communication networks of project teams. Therefore, it is possible to hypothesize that the characteristics of communication networks play role in generation of new knowledge. With the data from 14 industry control system projects of a Russian engineering company the communication network structure characteristics were calculated and the analysis of correlation between these characteristics and knowledge generation capabilities was performed. As a result correlation between centralization of communication and the number of new technical solutions developed in projects was discovered.

  2. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  3. Technology Transfer Programme In Reactor Digital Instrumentation And Control System (REDICS) Project: Knowledge, Experiences And Future Expectations

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Mohamad Puad Abu; Izhar Abu Hussin; Ridzuan Abdul Mutalib; Zareen Khan Abdul Jalil Khan; Mohd Khairulezwan Abdul Manan; Mohd Sabri Minhat; Mohd Idris Taib

    2013-01-01

    The PUSPATI TRIGA MARK II research reactor in Malaysia was commissioned in 1982. After 31 years of operation, Nuclear Malaysia is taking an approach for a better research and development in nuclear radiations as well as the technical services that provided. Reactor TRIGA PUSPATI (RTP) is currently upgrading its control console from analogue to digital system. The Reactor Digital Instrumentation and Control System (ReDICS) project is done on cooperation with Korea Atomic Energy Research Institute (KAERI), Korea including the technical part from the design stage until commissioning as well as the Technology Transfer Program (TTP). TTP in this ReDICS project is a part of Human Resource and System Development Program. It was carried out from the design stage until the commissioning of the system. It covers all subjects related to the design on the digital system and the requirements for the operation of RTP. The objective of this paper is to share the knowledge and experiences gained through this ReDICS project. This paper will also discuss the future expectations from this ReDICS project for Nuclear Malaysia and its personnel, as well as to the country. (author)

  4. Load Control System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Trudnowski, Daniel [Montana Tech of the Univ. of Montana, Butte, MT (United States)

    2015-04-03

    This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

  5. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  6. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    Energy Technology Data Exchange (ETDEWEB)

    Wade, F. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-21

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for the chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.

  7. Adaptive controller design for modified projective synchronization of Genesio-Tesi chaotic system with uncertain parameters

    International Nuclear Information System (INIS)

    Park, Ju H.

    2007-01-01

    The paper addresses control problem for the modified projective synchronization of the Genesio-Tesi chaotic systems with three uncertain parameters. An adaptive control law is derived to make the states of two identical Genesio-Tesi systems asymptotically synchronized up to specific ratios. The stability analysis in the paper is proved using a well-known Lyapunov stability theory. A numerical simulation is presented to show the effectiveness of the proposed chaos synchronization scheme

  8. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study. Volume 2: Appendices

    Science.gov (United States)

    Hanks, G. W.; Shomber, H. A.; Dethman, H. A.; Gratzer, L. B.; Maeshiro, A.; Gangsaas, D.; Blight, J. D.; Buchan, S. M.; Crumb, C. B.; Dorwart, R. J.

    1981-01-01

    The current status of the Active Controls Technology (ACT) for the advanced subsonic transport project is investigated through analysis of the systems technical data. Control systems technologies under examination include computerized reliability analysis, pitch axis fly by wire actuator, flaperon actuation system design trade study, control law synthesis and analysis, flutter mode control and gust load alleviation analysis, and implementation of alternative ACT systems. Extensive analysis of the computer techniques involved in each system is included.

  9. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  10. Modernization of control system using the digital control system

    International Nuclear Information System (INIS)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-01-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  11. The Environmental Control and Life Support System (ECLSS) advanced automation project

    Science.gov (United States)

    Dewberry, Brandon S.; Carnes, Ray

    1990-01-01

    The objective of the environmental control and life support system (ECLSS) Advanced Automation Project is to influence the design of the initial and evolutionary Space Station Freedom Program (SSFP) ECLSS toward a man-made closed environment in which minimal flight and ground manpower is needed. Another objective includes capturing ECLSS design and development knowledge future missions. Our approach has been to (1) analyze the SSFP ECLSS, (2) envision as our goal a fully automated evolutionary environmental control system - an augmentation of the baseline, and (3) document the advanced software systems, hooks, and scars which will be necessary to achieve this goal. From this analysis, prototype software is being developed, and will be tested using air and water recovery simulations and hardware subsystems. In addition, the advanced software is being designed, developed, and tested using automation software management plan and lifecycle tools. Automated knowledge acquisition, engineering, verification and testing tools are being used to develop the software. In this way, we can capture ECLSS development knowledge for future use develop more robust and complex software, provide feedback to the knowledge based system tool community, and ensure proper visibility of our efforts.

  12. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  13. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  14. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  15. Radiometric compensation for cooperative distributed multi-projection system through 2-DOF distributed control.

    Science.gov (United States)

    Tsukamoto, Jun; Iwai, Daisuke; Kashima, Kenji

    2015-11-01

    This paper proposes a novel radiometric compensation technique for cooperative projection system based-on distributed optimization. To achieve high scalability and robustness, we assume cooperative projection environments such that 1. each projector does not have information about other projectors as well as target images, 2. the camera does not have information about the projectors either, while having the target images, and 3. only a broadcast communication from the camera to the projectors is allowed to suppress the data transfer bandwidth. To this end, we first investigate a distributed optimization based feedback mechanism that is suitable for the required decentralized information processing environment. Next, we show that this mechanism works well for still image projection, however not necessary for moving images due to the lack of dynamic responsiveness. To overcome this issue, we propose to implement an additional feedforward mechanism. Such a 2 Degree Of Freedom (2-DOF) control structure is well-known in control engineering community as a typical method to enhance not only disturbance rejection but also reference tracking capability, simultaneously. We theoretically guarantee and experimentally demonstrate that this 2-DOF structure yields the moving image projection accuracy that is overwhelming the best achievable performance only by the distributed optimization mechanisms.

  16. Mechanical Engineering Design Project report: Enabler control systems

    Science.gov (United States)

    Cullen, Christian; Delvecchio, Dave; Scarborough, Alan; Havics, Andrew A.

    1992-01-01

    The Controls Group was assigned the responsibility for designing the Enabler's control system. The requirement for the design was that the control system must provide a simple user interface to control the boom articulation joints, chassis articulation joints, and the wheel drive. The system required controlling hydraulic motors on the Enabler by implementing 8-bit microprocessor boards. In addition, feedback to evaluate positions and velocities must be interfaced to provide the operator with confirmation as well as control.

  17. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  18. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  19. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  20. Nuclear outages: an approach to project controls

    International Nuclear Information System (INIS)

    Bryson, R.

    1985-01-01

    The annual budget for maintaining and operating a nuclear power plant has risen dramatically over the past 5 years. NRC-mandated plant improvements and outage related expenses are often cited to be the main contributors to these escalating budgets. Nuclear utilities have responded by developing programs to improve plant availability and outage costs through improved outage performance. Utilities recognize that for capital improvements the program to control costs does no begin with outage planning, but rather more appropriately up front during the engineering phase. To support their management objectives, utilities have been developing comprehensive project control systems for concurrently reducing capital expenditures, outage-related costs, and time. This paper provides an approach to project controls that, rather than using one all inclusive comprehensive system, requires five separate monitoring systems - one for each phase of an activity's life cycle. Through the integration of these discrete but interrelated systems, utility management acquires the necessary tools for comprehensive planning and control of their modification program and effective detailed monitoring for all outage-related activities

  1. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  2. Modernization of turbine control system and reactor control system in Almaraz 1 and 2

    International Nuclear Information System (INIS)

    Pulido, C.; Diez, J.; Carrasco, J. A.; Lopez, L.

    2005-01-01

    The replacement of the Turbine Control System and Reactor Control System are part of the Almaraz modernization program for the Instrumentation and Control. For these upgrades Almaraz has selected the Ovation Platform that provides open architecture and easy expansion to other systems, these platforms is highly used in many nuclear and thermal plants around the world. One of the main objective for this project were to minimize the impact on the installation and operation of the plant, for that reason the project is implemented in two phases, Turbine Control upgrade and Reactor Control upgrade. Another important objective was to increase the reliability of the control system making them fully fault tolerant to single failures. The turbine Control System has been installed in Units 1 and 2 while the Reactor Control System will be installed in 2006 and 2007 outages. (Author)

  3. QLab 3 show control projects for live performances & installations

    CERN Document Server

    Hopgood, Jeromy

    2013-01-01

    Used from Broadway to Britain's West End, QLab software is the tool of choice for many of the world's most prominent sound, projection, and integrated media designers. QLab 3 Show Control: Projects for Live Performances & Installations is a project-based book on QLab software covering sound, video, and show control. With information on both sound and video system basics and the more advanced functions of QLab such as MIDI show control, new OSC capabilities, networking, video effects, and microphone integration, each chapter's specific projects will allow you to learn the software's capabilitie

  4. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  5. The LHC experiments' joint controls project (JCOP)

    International Nuclear Information System (INIS)

    Wayne Salter

    2001-01-01

    The development and maintenance of the control systems of the four Large Hadron Collider (LHC) experiments will require a non-negligible amount of resources and effort. In order to minimise the overall effort required the Joint Controls Project (JCOP) was set-up as a collaboration between CERN and the four LHC experiments to find and implement common solutions for the control of the LHC experiments. It is one of the few examples of such a wide collaboration and therefore the existence of the JCOP project is extremely significant. The author will give a brief overview of the project, its structure and its history. It will go on to summarise the various sub-projects that have been initiated under the auspices of JCOP together will their current status. It will highlight that the JCOP general principle is to promote the use of industrial solutions wherever possible. However, this does not rule out the provision of custom solutions when non-standard devices or very large numbers of devices have to be controlled. The author will also discuss the architecture foreseen by JCOP and where in this architecture the various types of solutions are expected to be used. Finally, although the selection of common industrial and custom solutions is a necessary condition for JCOP to succeed, the use of these solutions in themselves would not necessarily lead to the production of homogeneous control systems. Therefore, the author will finish with a description of the JCOP Framework, which is being developed to promote the use of these common solutions, to reduce the development effort required by the various experiment development teams and to help to build and integrate control systems which can be more easily maintained

  6. Implementation of quality control systems in laboratories in Paraguay by the participants of ARCAL LXXVI project

    International Nuclear Information System (INIS)

    Villanueva, Z.

    2004-12-01

    In the Project ARCAL LXXVII, was realized the National Course of Control of Quality of Analytic Laboratories, from 12 to 16 of April in the CNEA, Paraguay, as a result of the one mentioned course was elaborated this project whose purpose is to elaborate the necessary documentation to fulfill the requirements of administration in the Analytic Laboratories to be adapted to the system of quality according to the ISO 17025 [es

  7. Robust Adaptive Sliding Mode Control for Generalized Function Projective Synchronization of Different Chaotic Systems with Unknown Parameters

    Directory of Open Access Journals (Sweden)

    Xiuchun Li

    2013-01-01

    Full Text Available When the parameters of both drive and response systems are all unknown, an adaptive sliding mode controller, strongly robust to exotic perturbations, is designed for realizing generalized function projective synchronization. Sliding mode surface is given and the controlled system is asymptotically stable on this surface with the passage of time. Based on the adaptation laws and Lyapunov stability theory, an adaptive sliding controller is designed to ensure the occurrence of the sliding motion. Finally, numerical simulations are presented to verify the effectiveness and robustness of the proposed method even when both drive and response systems are perturbed with external disturbances.

  8. The Joint COntrols Project Framework

    CERN Document Server

    González-Berges, M

    2003-01-01

    The Framework is one of the subprojects of the Joint COntrols Project (JCOP), which is collaboration between the four LHC experiments and CERN. By sharing development, this will reduce the overall effort required to build and maintain the experiment control systems. As such, the main aim of the Framework is to deliver a common set of software components, tools and guidelines that can be used by the four LHC experiments to build their control systems. Although commercial components are used wherever possible, further added value is obtained by customisation for HEP-specific applications. The supervisory layer of the Framework is based on the SCADA tool PVSS, which was selected after a detailed evaluation. This is integrated with the front-end layer via both OPC (OLE for Process Control), an industrial standard, and the CERN-developed DIM (Distributed Information Management System) protocol. Several components are already in production and being used by running fixed-target experiments at CERN as well as for th...

  9. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  10. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  11. A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects

    Science.gov (United States)

    Salas, Andrea O.; Rogers, James L.

    1997-01-01

    In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.

  12. Overview of implementing a project control system in the nuclear utility industry

    International Nuclear Information System (INIS)

    Cooprider, D.H.

    1994-01-01

    During the late 1980s, a metamorphosis began at Florida Power and Light Company (FPL). A strategic step in nuclear engineering's efforts to become more cost effective began in January 1990. A project control department was formed. The initial mission was to provide support for nuclear engineering design activities associated with FPL's two twin-unit nuclear power generation facilities - Turkey Point and St. Lucie. Later, the goal expanded to include the division's materials management, nuclear licensing, and information management departments. The project control group was organized along the lines of the organizations served. Separate dedicated groups were established for each plant. Since most engineering activity was based at the Juno Beach headquarters, the project control staff also was based there

  13. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  14. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  15. New generation control system at SLAC

    International Nuclear Information System (INIS)

    Melen, R.

    1981-03-01

    The proposed SLAC Linear Collider (SLC) project will require an Instrumentation and Control system that provides integrated automatic monitoring and control functions. The present SLAC LINAC Instrumentation and Control system will be totally revamped and it will be expanded to include the support of all of the additional accelerator components that will be required for the whole SLC project. This paper describes the functional operation of the new system

  16. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  17. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Verburgh, Pierre; Menager, Antoine

    2010-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. The deployment shall continue with the other 32 units until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational management through life support. Cegelec, with

  18. A model-based control system concept

    International Nuclear Information System (INIS)

    Aarzen, K.E.

    1992-12-01

    This paper presents an overview of a new concept for DCSs developed within the KBRTCS (Knowledge-Based Real-Time Control Systems) project performed between 1988 and 1991 as a part of the Swedish IT4 programme. The partners of the project have been the Department of Automatic Control at Lund University, Asea Brown Boveri, and during parts of the project, SattControl, and TeleLogic. The aim of the project has been to develop a concept for future generations of DCSs based on a plant database containing a description of the plant together with the control system. The database is object-based and supports multiple views of an objects. A demonstrator is presented where a DCS system of this type is emulated. The demonstrator contains a number of control, monitoring, and diagnosis applications that execute in real time against a simulations of Steritherm sterilization process. (25 refs.)

  19. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  20. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Desgeorge, Romain; Verburgh, Pierre

    2014-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first of kind units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. With 20 units in operation in 2014, the deployment shall continue with the other 14 until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational

  1. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  2. The rejuvenation of TRISTAN control system

    International Nuclear Information System (INIS)

    Mimashi, T.; Urakawa, J.; Kurokawa, S.; Kawamoto, T.; Takeda, S.; Akiyama, A.; Kudoh, K.; Komada, K.; Naitoh, T.

    1992-01-01

    The current TRISTAN accelerator control system uses CAMAC as a front end electronics, and they are controlled by twenty five Hitachi minicomputer HIDIC 80's which are linked with an N-to-N token ring network. After five years from now, these computers must be replaced. This is because of the life time of control system and we have to cope with the requirements imposed by our future project such as the KEK B-Factory and the main ring photon factory projects. The rejuvenation of this control has to be done under some constraints such as the lack of manpower, limited time and financing. First we review the problems of current control system, then the philosophy of the new generation control system is presented. Finally it is discussed how to move to the new generation control system from the current TRISTAN control system. (author)

  3. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  4. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    Science.gov (United States)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  6. Improving industrial process control systems security

    CERN Document Server

    Epting, U; CERN. Geneva. TS Department

    2004-01-01

    System providers are today creating process control systems based on remote connectivity using internet technology, effectively exposing these systems to the same threats as corporate computers. It is becoming increasingly difficult and costly to patch/maintain the technical infrastructure monitoring and control systems to remove these vulnerabilities. A strategy including risk assessment, security policy issues, service level agreements between the IT department and the controls engineering groups must be defined. In addition an increased awareness of IT security in the controls system engineering domain is needed. As consequence of these new factors the control system architectures have to take into account security requirements, that often have an impact on both operational aspects as well as on the project and maintenance cost. Manufacturers of industrial control system equipment do however also propose progressively security related solutions that can be used for our active projects. The paper discusses ...

  7. Stochastic modeling and control system designs of the NASA/MSFC Ground Facility for large space structures: The maximum entropy/optimal projection approach

    Science.gov (United States)

    Hsia, Wei-Shen

    1986-01-01

    In the Control Systems Division of the Systems Dynamics Laboratory of the NASA/MSFC, a Ground Facility (GF), in which the dynamics and control system concepts being considered for Large Space Structures (LSS) applications can be verified, was designed and built. One of the important aspects of the GF is to design an analytical model which will be as close to experimental data as possible so that a feasible control law can be generated. Using Hyland's Maximum Entropy/Optimal Projection Approach, a procedure was developed in which the maximum entropy principle is used for stochastic modeling and the optimal projection technique is used for a reduced-order dynamic compensator design for a high-order plant.

  8. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  9. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  10. The role of instrumentation and control systems in power uprating projects for nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA's activities in nuclear power plant operating performance and life cycle management are aimed at increasing Member State capabilities in utilizing good engineering and management practices developed and transferred by the IAEA. In particular, the IAEA supports activities focusing on the improvement of nuclear power plant (NPP) performance, plant life management, training, power uprating, operational licence renewal, and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of the I and C systems' role in power uprating projects in NPPs was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation in 2003. The subject was then approved by the IAEA and included in the programmes for 2004-2007. The increasing importance of power uprating projects can be attributed to the general worldwide tendency to the deregulation of the electricity market. The greater demand for electricity and the available capacity and safety margins, as well as the pressure from several operating NPPs resulted in requests for licence modification to enable operation at a higher power level, beyond the original licence provisions. A number of nuclear utilities have already gone through the uprating process for their nuclear reactors, and many more are planning to go through this modification process. In addition to mechanical and process equipment changes, parts of the electrical and I and C systems and components may also need to be altered to accommodate the new operating conditions and safety limits. This report addresses the role of I and C systems in NPP power uprating projects. The objective of the report is to provide guidance to utilities, safety analysts, regulators and others involved in the preparation, implementation and licensing of power uprating projects, with particular emphasis on the I and C aspects of these projects. As the average age of NPPs is increasing, it is becoming common for

  11. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  12. Control system of the MACSE project

    International Nuclear Information System (INIS)

    Gournay, J.F.; Gougnaud, F.; Matichard, G.; Azoulay, R.; Bouillac, A.

    1991-01-01

    With the goal of investigating all the technological aspects of superconducting RF acceleration, the so-called MACSE facility was put in operation at the end of 1990. The control system is built with several VME crates linked together with a dedicated Ethernet network. VxWorks is the real-time operating system used. A set of software services was built on top of VxWorks (high level communication tools, a data-base management system, a library of VME boards drivers and a limited man-machine interface). A complete range of application programs have been developed with these tools in order to fulfill the requirements of such a facility (settings of the parameters, surveillance, archive facility, closed loops...). The TCP-IP protocols family is extensively used for communications between the components of the system (UDP, RPC, rcmd, NFS). The development environment is based on the host-target approach through the use of a network of Sun 3/80 workstations. After 1 1/2 year of experience, this system has proven to be powerful and flexible [fr

  13. The reactor power control system based on digital control in nuclear power plant

    International Nuclear Information System (INIS)

    Liu Chong; Zhou Jianliang; Tan Ping

    2010-01-01

    The PLC (Programmable Logical Controller), digital communication and redundant techniques are applied in the rod control and position indication system(namely the reactor power control system) to perform the power control in the 300 MW reactor automatically and integrally in Qinshan Phase I project. This paper introduces the features, digital design methods of hardware of the instrumentation and control system (I and C) in the reactor power control. It is more convenient for the information exchange by human-machine interface (HMI), operation and maintenance, and the system reliability has been greatly improved after the project being reconstructed. (authors)

  14. The ILC global control system

    International Nuclear Information System (INIS)

    Carwardine, J.; Arnold, N.; Lenkszus, F.; Saunders, C.; Rehlich, K.; Simrock, S.; Banerjee, B.; Chase, B.; Gottschalk, E.; Joireman, P.; Kasley, P.; Lackey, S.; McBride, P.; Pavlicek, V.; Patrick, J.; Votava, M.; Wolbers, S.; Furukawa, K.; Michizono, S.; Larsen, R.S.; Downing, R.

    2008-01-01

    The scale and performance parameters of the ILC require new thinking in regards to control system design. This design work has begun quite early in comparison to most accelerator projects, with the goal of uniquely high overall accelerator availability. Among the design challenges are high control system availability, precision timing and rf phase reference distribution, standardizing of interfaces, operability, and maintainability. We present the current state of the design and take a prospective look at ongoing research and development projects.

  15. Control room modernization at Finnish nuclear power plants - Two projects compared

    International Nuclear Information System (INIS)

    Laarni, J.; Norros, L.

    2006-01-01

    The modernization of automation systems and human-machine interfaces is a current issue at both of the two nuclear power plants (i.e., Fortum's Loviisa plant and TVO's Olkiluoto plant) in Finland. Since the plants have been launched in the 1970's or 1980's, technology is in part old-fashioned and needs to be renewed. At Olkiluoto upgrades of the turbine operator systems have already been conducted; at Loviisa the first phase of the modernization project has just started. Basically, there is a question of the complete digitalization of the information streams at the two plants, and transition from a conventional hard-wired or hybrid control room to a screen-based one. The new human-machine interfaces will comprise new technology, such as PC workstations, soft control, touch screens and large-screen overall displays. The modernization of human-system interfaces is carried out in a stepwise manner at both plants. At both plants the main driver has not been the need to renew the user interfaces of the control room, but the need to upgrade the automation systems. In part because of this, there is a lack of a systematic top-down approach in which different aspects of human factors (HF) engineering are considered in relationship to higher level goals. Our aim here is to give an overview description of the control room modernization projects at the two plants and provide a preliminary evaluation of their progress to date. The projects are also compared, for example, in terms of duration, scope and phasing, and who is responsible for the realization of the project. In addition, we also compare experiences from the Finnish projects to experiences from similar projects abroad. The main part of the data used in this study is based on designers' and project members' interviews. (authors)

  16. The Controlled Ecological Life Support System Antarctic Analog Project: Prototype Crop Production and Water Treatment System Performance

    Science.gov (United States)

    Bubenheim, David L.; Flynn, Michael T.; Bates, Maynard; Schlick, Greg; Kliss, Mark (Technical Monitor)

    1997-01-01

    The Controlled Ecological Life Support System (CELSS) Antarctic Analog Project (CAAP), is a joint endeavor between the National Science Foundation, Office of Polar Programs (NSF-OPP) and the NASA. The fundamental objective is to develop, deploy, and operate a testbed of advanced life support technologies at the Amundsen-Scott South Pole Station that enable the objectives of both the NSF and NASA. The functions of food production, water purification, and waste treatment, recycle and reduction provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, enhance safety and minimize environmental impacts associated with human presence on the polar plateau. Because of the analogous technical, scientific, and mission features with Planetary missions such as a mission to Mars, CAAP provides NASA with a method for validating technologies and overall approaches to supporting humans. Prototype systems for sewage treatment, water recycle and crop production are being evaluated at Ames Research Center. The product water from sewage treatment using a Wiped-Film Rotating Disk is suitable for input to the crop production system. The crop production system has provided an enhanced level of performance compared with projected performance for plant-based life support: an approximate 50% increase in productivity per unit area, more than a 65% decrease in power for plant lighting, and more than a 75% decrease in the total power requirement to produce an equivalent mass of edible biomass.

  17. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  18. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  19. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  20. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  1. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  2. An ex ante control chart for project monitoring using earned duration management observations

    Science.gov (United States)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  3. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  4. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  5. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  6. Biotelemetry system for Epilepsy Seizure Control

    Energy Technology Data Exchange (ETDEWEB)

    Smith, LaCurtise; Bohnert, George W.

    2009-07-02

    The Biotelemetry System for Epilepsy Seizure Control Project developed and tested an automated telemetry system for use in an epileptic seizure prevention device that precisely controls localized brain temperature. This project was a result of a Department of Energy (DOE) Global Initiatives for Proliferation Prevention (GIPP) grant to the Kansas City Plant (KCP), Argonne National Laboratory (ANL), and Pacific Northwest National Laboratory (PNNL) to partner with Flint Hills Scientific, LLC, Lawrence, KS and Biophysical Laboratory Ltd (BIOFIL), Sarov, Russia to develop a method to help control epileptic seizures.

  7. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  8. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  9. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  10. Upgrading the Reactor Power Control Concept with a Modern Digital Control System

    International Nuclear Information System (INIS)

    Laengle, M.; Schildheuer, R.

    2011-01-01

    Within the framework of a retrofit project, a reactor power instrumentation and control system (REALL) - consisting of a limiting system and the respective reactor control systems - was retrofitted and modernized in a 1450-MW-nuclear-power-plant in Baden-Wuerttemberg. The REALL process control functions were implemented within a modern and completely digitized control system that has been designed for use in safety I and C applications. Along with the installation of the digital control system, the associated hardware was adapted to today's state of the art. At the same time, the given potential for improvement, as revealed during the plant's operation so far, was taken into account in the programming. In order to provide for transparent and quality-assured project management, the implementation was based on a stage plan consisting of several steps, along with specific milestones. Final commissioning of the modern digital control system took place during the 2008 plant overhaul. Despite the complex commissioning procedure, it was possible to avoid a major prolongation of the plant's downtime and to keep within a rough 4-week timeframe that had originally been defined for the plant overhaul to adequate structuring of the project, goal-oriented implementation of preparatory infrastructural measures and adequate scheduling of the coordinated activities of the installation and commissioning teams entrusted with the commissioning of the digital control system during the overhaul activities. (author)

  11. Stability and control of wind farms in power systems

    Energy Technology Data Exchange (ETDEWEB)

    Jauch, C.

    2006-10-15

    The Ph.D. project 'Stability and Control of Wind Farms in Power Systems' deals with some selected problems related to wind power in power systems. With increasing wind power penetration, wind turbines substitute the power production of conventional power plants. Therefore, wind turbines also have to take over the power system stabilisation and control tasks, that were traditionally carried out by conventional power plants. Out of the many aspects related to this problem, this project focuses on transient fault ride-through and power system stabilisation. The selection of turbine types considered in this project is limited to active-stall turbines and variable speed, variable pitch turbines with gearboxes and full-scale converter-connected synchronous generators. As a basis for the project, a study into the state of the art is conducted at the beginning of the project. Grid connection requirements that were in force, or published as drafts, at the time, and scientific literature related to the topic, are studied. The project is based on simulations of wind turbines in a power system simulations tool. Some of the models used in this project were readily available prior to the project; the development of others is part of the project. The most extensive modelling work deals with the design of the electrical part of the variable speed turbine and its controls. To simulate realistic grid operation the wind turbine models are connected to an aggregated model of the Nordic power system. For that purpose the Nordic power system model, which was available prior to the project, is extended with a realistic feeder configuration. It is commonly demanded from modern wind turbines, that they must not disconnect in case of transient faults. Therefore, controllers are designed that enable the two turbine types to ride through transient faults. With these transient fault controllers the wind turbines can stay connected to the grid, such that their generation capacity is

  12. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  13. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  14. The control system

    International Nuclear Information System (INIS)

    1988-01-01

    The present control system has matured both in terms of age and capacity. Thus a new system based on a local area network (LAN) is being developed. A pilot project has been started but, owing to difficulties encountered with the present operating system used with the microprocessors, it has become necessary to reconsider the choice of operating system. A recently-released multi-tasking operating system that runs on the existing hardware has been chosen. 1 fig

  15. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  16. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  17. Arduino based acquisition system for control applications

    OpenAIRE

    Granado Navarro, Miguel Ángel

    2012-01-01

    The aim of this project is to design an implement a low cost acquisition system intended for control applications using the Arduino prototyping platform. Arduino has become a popular open-source single-board microcontroller among electronic hobbyists, and it is gaining acceptance as a quick prototyping tool for engineering and educational projects also. A computer, using a control application done in LabVIEW or IDE Arduino, must control all the system by cable or wireless. The pro...

  18. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  19. A New 4D Hyperchaotic System and Its Generalized Function Projective Synchronization

    Directory of Open Access Journals (Sweden)

    Yuan Gao

    2013-01-01

    Full Text Available A new four-dimensional hyperchaotic system is investigated. Numerical and analytical studies are carried out on its basic dynamical properties, such as equilibrium point, Lyapunov exponents, Poincaré maps, and chaotic dynamical behaviors. We verify the realizability of the new system via an electronic circuit by using Multisim software. Furthermore, a generalized function projective synchronization scheme of two different hyperchaotic systems with uncertain parameters is proposed, which includes some existing projective synchronization schemes, such as generalized projection synchronization and function projective synchronization. Based on the Lyapunov stability theory, a controller with parameters update laws is designed to realize synchronization. Using this controller, we realize the synchronization between Chen hyperchaotic system and the new system to verify the validity and feasibility of our method.

  20. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  1. Guidance and Control Software Project Data - Volume 3: Verification Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  2. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  3. 4"t"h Annual workshop proceedings of the collaborative project ''Redox phenomena controlling systems'' (7"t"h EC FP CP RECOSY)

    International Nuclear Information System (INIS)

    Altmaier, Marcus; Kienzler, Bernhard; Duro, Lara; Grive, Mireia; Montoya, Vanessa

    2012-01-01

    The EURATOM 7"t"h EC Framework Program Collaborative Project REdox phenomena Controlling SYstems (RECOSY) started in April 2008 and extends over 4 years. Although redox is not a new geochemical issue, different questions are still not resolved. For this reason, main objectives of RECOSY project are a) the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal, b) providing tools to apply the result to Performance Assessment/Safety Case, c) training of next generation and d) documentation and communication of the results. To this aim, the project set up a consortium of 32 Beneficiaries/Contractors and 6 Associated Groups. The consortium includes key European Research Institutes, Universities, National Waste Management Agencies and SMEs, from 13 EURATOM signatory states, Russia, Japan, Korea, USA and one European Joint Research Centre. The ReCosy concept is innovative in the scientific approach to the redox phenomena. It includes i) advanced analytical tools, ii) investigations of processes responsible for redox control (thermodynamically and kinetically controlled processes, surface reactions and microbial processes,..), iii) provision of required data on redox controlling processes, and iv) response to disturbances in disposal systems. The work program is structured along six RTD workpackages (WP1-6). They cover near-field and far field aspects as well as all relevant host-rocks considered in Europe. In WP1, the scientific state-of-the-art and its application to Performance Assessment/Safety Case is documented and regularly updated. WP2 focuses on development of redox determination methods. WP3 focuses on redox response of defined and near-natural systems. WP4 studies the redox reactions of radionuclides. WP5 focuses on Redox processes in radionuclide transport and WP6 deals with redox reactions affecting the spent fuel source-term. Specific workpackages on knowledge management, education and

  4. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  5. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  6. Modernization of control system using the digital control system; Modernizacion de sistemas de control usando la simulacion como herramiento de ingenieria

    Energy Technology Data Exchange (ETDEWEB)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-07-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  7. Lessons learned on the Ground Test Accelerator control system

    International Nuclear Information System (INIS)

    Kozubal, A.J.; Weiss, R.E.

    1994-01-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers' toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks to deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ''Experimental Physics and Industrial Control System'' (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects

  8. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  9. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  10. Microphonics control for Project X

    International Nuclear Information System (INIS)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.

    2011-01-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High β 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  11. Microphonics control for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  12. Hardware and Software Integration in Project Development of Automated Controller System Using LABVIEW FPGA

    International Nuclear Information System (INIS)

    Mohd Khairulezwan Abd Manan; Mohd Sabri Minhat; Izhar Abu Hussin

    2014-01-01

    The Field-Programmable Gate Array (FPGA) is a semiconductor device that can be programmed after manufacturing. Instead of being restricted to any predetermined hardware function, an FPGA allows user to program product features and functions, adapt to new standards, and reconfigure hardware for specific applications even after the product has been installed in the field, hence the name field-programmable. This project developed a control system using LabVIEW FPGA. LabVIEW FPGA is easier where it is programmed by using drag and drop icon. Then it will be integrated with the hardware input and output. (author)

  13. Preliminary design study of advanced composite blade and hub and nonmechanical control system for the tilt-rotor aircraft. Volume 2: Project planning data

    Science.gov (United States)

    1980-01-01

    Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.

  14. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  15. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  16. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm

  17. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  18. Safety control system and its interface to EPICS for the off-line front end of the SPES project

    International Nuclear Information System (INIS)

    Vasquez, J.; Andrighetto, A.; Bassato, G.; Costa, L.; Giacchini, M.; Bertocco, M.

    2012-01-01

    The SPES (Selective Production of Exotic Species) project is based on a facility for the production of neutron-rich radioactive ion beams using the isotope separation on-line technique. The SPES off-line front-end apparatus involves a number of subsystems and procedures that are potentially dangerous both for human operators and for the equipment. The high voltage power supply, the ion source complex power supplies, the target chamber handling systems and the laser source are some example of these subsystems. For that reason, a safety control system has been developed. It is based on Schneider Electrics Preventa family safety modules that control the power supply of critical subsystems in combination with safety detectors that monitor critical variables. A Programmable Logic Controller (PLC), model BMXP342020 from the Schneider Electrics Modicon M340 family, is used for monitoring the status of the system as well as controlling the sequence of some operations in automatic way. A touch screen, model XBTGT5330 from the Schneider Electrics Magelis family, is used as Human Machine Interface (HMI) and communicates with the PLC using MODBUS-TCP. Additionally, an interface to the EPICS control network was developed using a home-made MODBUS-TCP EPICS driver in order to integrate it to the control system of the Front End as well as present the status of the system to the users on the main control panel. (authors)

  19. Adaptive modified function projective synchronization of multiple time-delayed chaotic Rossler system

    International Nuclear Information System (INIS)

    Sudheer, K. Sebastian; Sabir, M.

    2011-01-01

    In this Letter we consider modified function projective synchronization of unidirectionally coupled multiple time-delayed Rossler chaotic systems using adaptive controls. Recently, delay differential equations have attracted much attention in the field of nonlinear dynamics. The high complexity of the multiple time-delayed systems can provide a new architecture for enhancing message security in chaos based encryption systems. Adaptive control can be used for synchronization when the parameters of the system are unknown. Based on Lyapunov stability theory, the adaptive control law and the parameter update law are derived to make the state of two chaotic systems are function projective synchronized. Numerical simulations are presented to demonstrate the effectiveness of the proposed adaptive controllers.

  20. The impulsive control synchronization of the drive-response complex system

    International Nuclear Information System (INIS)

    Zhao Yanhong; Yang Yongqing

    2008-01-01

    This Letter investigates projective synchronization between the drive system and response complex dynamical system. An impulsive control scheme is adapted to synchronize the drive-response dynamical system to a desired scalar factor. By using the stability theory of the impulsive differential equation, the criteria for the projective synchronization are derived. The feasibility of the impulsive control of the projective synchronization is demonstrated in the drive-response dynamical system

  1. Robust function projective synchronization of a class of uncertain chaotic systems

    International Nuclear Information System (INIS)

    Shen Liqun; Liu Wanyu; Ma Jianwei

    2009-01-01

    In this paper, the function projective synchronization problem of chaotic systems is investigated, where parameter mismatch exists between the drive system and the response system. Based on Lyapunov stability theory, a novel robust function projective synchronization scheme is proposed. And the parameter mismatch problem is also solved. Simulation results of Lorenz system and Chen system verify the effectiveness of the proposed control scheme.

  2. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  3. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  4. Power control for wind turbines in weak grids: Project summary

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    . The two case studies (Madeira, Portugal and Co. Donegal, Ireland) revealed that sometimes theleast cost and most attractive option is change in the operating strategy of the power system. This allowed that further wind energy can be integrated at competitive cost in the Madeira power system. In Co....... Donegal the options for pumped storage are goodcombined with good wind resources. Unfortunately the grid is weak. The least cost option for the feeder studied is either grid reinforcement or a power control system based on pumped storage if rather large amounts of wind energy are to be absorbed...... by thepower system. The cost estimates for the two options are in the same range. The current report is a summary of the work done in the project 'Power Control for Wind Turbines in Weak Grids'. The project has been partly funded by EU under contractJOR3-CT95-0067....

  5. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  6. IT Project Management from a Systems Thinking Perspective: A Position Paper

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. To illustrate our proposal, we present an example model of the dynamics of IT out-sourcing projects. The example model explains these

  7. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    safety and operational challenges of national airspace access by unmanned aircraft systems, or UAS. In the process, the project will work with other key stakeholders to define necessary deliverables and products to help enable such access. Within the project, NASA is focusing on five sub-projects. These five focus areas include assurance of safe separation of unmanned aircraft from manned aircraft when flying in the national airspace; safety-critical command and control systems and radio frequencies to enable safe operation of UAS; human factors issues for ground control stations; airworthiness certification standards for UAS avionics and integrated tests and evaluation designed to determine the viability of emerging UAS technology. Five Focus Areas of the UAS Integration in the NAS Project Separation Assurance Provide an assessment of how planned Next Generation Air Transportation System (NextGen) separation assurance systems, with different functional allocations, perform for UAS in mixed operations with manned aircraft Assess the applicability to UAS and the performance of NASA NextGen separation assurance systems in flight tests with realistic latencies and uncertain trajectories Assess functional allocations ranging from today's ground-based, controller-provided aircraft separation to fully autonomous airborne self-separation Communications Develop data and rationale to obtain appropriate frequency spectrum allocations to enable safe and efficient operation of UAS in the NAS Develop and validate candidate secure safety-critical command and control system/subsystem test equipment for UAS that complies with UAS international/national frequency regulations, standards and recommended practices and minimum operational and aviation system performance standards for UAS Perform analysis to support recommendations for integration of safety-critical command and control systems and air traffic control communications to ensure safe and efficient operation of UAS in the NAS

  8. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  9. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  10. System maintenance test plan for the TWRS controlled baseline database system

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented

  11. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  12. Switched modified function projective synchronization of hyperchaotic Qi system with uncertain parameters

    Science.gov (United States)

    Sebastian Sudheer, K.; Sabir, M.

    2010-12-01

    This work is involved with switched modified function projective synchronization of two identical Qi hyperchaotic systems using adaptive control method. Switched synchronization of chaotic systems in which a state variable of the drive system synchronize with a different state variable of the response system is a promising type of synchronization as it provides greater security in secure communication. Modified function projective synchronization with the unpredictability of scaling functions can enhance security. Recently formulated hyperchaotic Qi system in the hyperchaotic mode has an extremely broad frequency bandwidth of high magnitudes, verifying its unusual random nature and indicating its great potential for some relevant engineering applications such as secure communications. By Lyapunove stability theory, the adaptive control law and the parameter update law are derived to make the state of two chaotic systems modified function projective synchronized. Synchronization under the effect of noise is also considered. Numerical simulations are presented to demonstrate the effectiveness of the proposed adaptive controllers.

  13. A homotopy algorithm for digital optimal projection control GASD-HADOC

    Science.gov (United States)

    Collins, Emmanuel G., Jr.; Richter, Stephen; Davis, Lawrence D.

    1993-01-01

    The linear-quadratic-gaussian (LQG) compensator was developed to facilitate the design of control laws for multi-input, multi-output (MIMO) systems. The compensator is computed by solving two algebraic equations for which standard closed-loop solutions exist. Unfortunately, the minimal dimension of an LQG compensator is almost always equal to the dimension of the plant and can thus often violate practical implementation constraints on controller order. This deficiency is especially highlighted when considering control-design for high-order systems such as flexible space structures. This deficiency motivated the development of techniques that enable the design of optimal controllers whose dimension is less than that of the design plant. A homotopy approach based on the optimal projection equations that characterize the necessary conditions for optimal reduced-order control. Homotopy algorithms have global convergence properties and hence do not require that the initializing reduced-order controller be close to the optimal reduced-order controller to guarantee convergence. However, the homotopy algorithm previously developed for solving the optimal projection equations has sublinear convergence properties and the convergence slows at higher authority levels and may fail. A new homotopy algorithm for synthesizing optimal reduced-order controllers for discrete-time systems is described. Unlike the previous homotopy approach, the new algorithm is a gradient-based, parameter optimization formulation and was implemented in MATLAB. The results reported may offer the foundation for a reliable approach to optimal, reduced-order controller design.

  14. Master Console System Monitoring and Control Development

    Science.gov (United States)

    Brooks, Russell A.

    2013-01-01

    The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.

  15. Adaptive Non-linear Control of Hydraulic Actuator Systems

    DEFF Research Database (Denmark)

    Hansen, Poul Erik; Conrad, Finn

    1998-01-01

    Presentation of two new developed adaptive non-liner controllers for hydraulic actuator systems to give stable operation and improved performance.Results from the IMCIA project supported by the Danish Technical Research Council (STVF).......Presentation of two new developed adaptive non-liner controllers for hydraulic actuator systems to give stable operation and improved performance.Results from the IMCIA project supported by the Danish Technical Research Council (STVF)....

  16. Modernization of turbine control system and reactor control system in Almaraz 1 and 2; MOdernizacion de los sistemas de control de turbina y del reactor en Almaraz 1 y 2

    Energy Technology Data Exchange (ETDEWEB)

    Pulido, C.; Diez, J.; Carrasco, J. A.; Lopez, L.

    2005-07-01

    The replacement of the Turbine Control System and Reactor Control System are part of the Almaraz modernization program for the Instrumentation and Control. For these upgrades Almaraz has selected the Ovation Platform that provides open architecture and easy expansion to other systems, these platforms is highly used in many nuclear and thermal plants around the world. One of the main objective for this project were to minimize the impact on the installation and operation of the plant, for that reason the project is implemented in two phases, Turbine Control upgrade and Reactor Control upgrade. Another important objective was to increase the reliability of the control system making them fully fault tolerant to single failures. The turbine Control System has been installed in Units 1 and 2 while the Reactor Control System will be installed in 2006 and 2007 outages. (Author)

  17. F-15 IFCS: Intelligent Flight Control System

    Science.gov (United States)

    Bosworth, John

    2007-01-01

    This viewgraph presentation describes the F-15 Intelligent Flight Control System (IFCS). The goals of this project include: 1) Demonstrate revolutionary control approaches that can efficiently optimize aircraft performance in both normal and failure conditions; and 2) Demonstrate advance neural network-based flight control technology for new aerospace systems designs.

  18. Athens automation and control experiment project review meeting, Knoxville, Tennessee, December 3-5, 1985

    Energy Technology Data Exchange (ETDEWEB)

    Braithwait, S.D.; Broadaway, E.R.; Fortson, N.D.; Gellings, C.W.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McKinley, K.F.; Monteen, L.D.; Newton, B.K.

    1986-08-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability.

  19. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  20. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  1. A Multidisciplinary PBL Robot Control Project in Automation and Electronic Engineering

    Science.gov (United States)

    Hassan, Houcine; Domínguez, Carlos; Martínez, Juan-Miguel; Perles, Angel; Capella, Juan-Vicente; Albaladejo, José

    2015-01-01

    This paper presents a multidisciplinary problem-based learning (PBL) project consisting of the development of a robot arm prototype and the implementation of its control system. The project is carried out as part of Industrial Informatics (II), a compulsory third-year course in the Automation and Electronic Engineering (AEE) degree program at the…

  2. The cryogenic control system of BEPCⅡ

    Institute of Scientific and Technical Information of China (English)

    LI Gang; WANG Ke-Xiang; ZHAO Ji-Jiu; YUE Ke-Juan; DAI Ming-Sui; HUANG Yi-Ling; JIANG Bo

    2008-01-01

    A superconducting cryogenic system has been designed and deployed in the Beijing Electron-Positron Collider Upgrade Project(BEPCⅡ).The system consists of a Siemens PLC(ST-PLC,Programmable Logic Controller)for the compressor control,an Allen Bradley(AB)PLC for the cryogenic equipments,and the Experimental Physics and Industrial Control System(EPICS)that integrates the PLCs.The system fully automates the superconducting cryogenic control with process control,PID(Proportional-Integral-Differential)control loops,real-time data access and data storage,alarm handler and human machine interface.It is capable of automatic recovery as well.This paper describes the BEPCⅡ cryogenic control system,data communication between ST-PLC and EPICS Input/Output Controllers(IOCs),and the integration of the flow control,the low level interlock,the AB-PLC,and EPICS.

  3. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  4. Energy efficient ventilation based on demand humidity control. Demonstration project with 49 apartments in Soenderborg

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The aim of the project is to demonstrate how the overall energy consumption in apartment buildings can be reduced through a combination of: 1) Energy efficient ventilation based on demand humidity control; 2) Energy efficient design of the building shell including passive solar and seasonally flexible sunspaces; 3) Use of low temperature heating system. The 3 blocks in the project, each with 16 apartments, are furnished with 3 different ventilation systems: 1) Standard exhaust system according to building codes; 2) Ventilation system with humidity control. Each room is furnished with an air inlet valve controlled by a processor, which monitors the humidity; 3) Standard ventilation system with heat recovery. (au)

  5. The AGS Booster control system

    International Nuclear Information System (INIS)

    Frankel, R.; Auerbach, E.; Culwick, B.; Clifford, T.; Mandell, S.; Mariotti, R.; Salwen, C.; Schumburg, N.

    1988-01-01

    Although moderate in size, the Booster construction project requires a comprehensive control system. There are three operational modes: as a high intensity proton injector for the AGS, as a heavy ion accelerator and injector supporting a wide range of ions and as a polarized proton storage injector. These requirements are met using a workstation based extension of the existing AGS control system. Since the Booster is joining a complex of existing accelerators, the new system will be capable of supporting multiuser operational scenarios. A short discussion of this system is discussed in this paper

  6. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  7. Status and Future Developments in Large Accelerator Control Systems

    International Nuclear Information System (INIS)

    Karen S. White

    2006-01-01

    Over the years, accelerator control systems have evolved from small hardwired systems to complex computer controlled systems with many types of graphical user interfaces and electronic data processing. Today's control systems often include multiple software layers, hundreds of distributed processors, and hundreds of thousands of lines of code. While it is clear that the next generation of accelerators will require much bigger control systems, they will also need better systems. Advances in technology will be needed to ensure the network bandwidth and CPU power can provide reasonable update rates and support the requisite timing systems. Beyond the scaling problem, next generation systems face additional challenges due to growing cyber security threats and the likelihood that some degree of remote development and operation will be required. With a large number of components, the need for high reliability increases and commercial solutions can play a key role towards this goal. Future control systems will operate more complex machines and need to present a well integrated, interoperable set of tools with a high degree of automation. Consistency of data presentation and exception handling will contribute to efficient operations. From the development perspective, engineers will need to provide integrated data management in the beginning of the project and build adaptive software components around a central data repository. This will make the system maintainable and ensure consistency throughout the inevitable changes during the machine lifetime. Additionally, such a large project will require professional project management and disciplined use of well-defined engineering processes. Distributed project teams will make the use of standards, formal requirements and design and configuration control vital. Success in building the control system of the future may hinge on how well we integrate commercial components and learn from best practices used in other industries

  8. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  9. Effects of control technology on the projected krypton-85 environmental inventory

    International Nuclear Information System (INIS)

    Oscarson, E.E.

    1973-01-01

    Growth projections for the USA nuclear power industry may be used to make projections of future radioactive material inventories available for potential release to the environment. Since krypton-85 is produced in reactors, the potential routes of release to the environment are at the reactors or the fuel reprocessing plants. The present generation of reactors and fuel reprocessing plants do not use any systems to limit the release of krypton-85 into the biosphere. Clean-up systems are currently being designed and could be introduced when necessary. The cumulative inventory of krypton-85 in the environment is dependent upon the time of introduction of these clean-up systems and their efficiencies, in addition to the total quantity produced. Annual and cumulative inventories of krypton-85 are projected to increase dramatically over the next 50 years. If controls are assumed to be initiated at various years, a series of graphs of different cumulative environmental inventories and the associated doses and health effects are drawn. Varying the year of introduction and the efficiency of these systems allows one to speculate as to the optimum time for control implementation

  10. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  11. Notions of local controllability and optimal feedforward control for quantum systems

    International Nuclear Information System (INIS)

    Chakrabarti, Raj

    2011-01-01

    Local controllability is an essential concept for regulation and control of time-varying nonlinear dynamical systems; in the classical control logic it is at the foundation of neighboring optimal feedback and feedforward control. We introduce notions of local controllability suited to feedforward control of classical input disturbances in bilinear quantum systems evolving on projective spaces and Lie groups. Tests for local controllability based on a Gramian matrix analogous to the nonlinear local controllability Gramian, which allow assessment of which trajectories can be regulated by perturbative feedforward in the presence of classical input noise, are presented. These notions explicitly incorporate system bilinearity and the geometry of quantum states into the definition of local controllability of quantum systems. Associated feedforward strategies are described.

  12. Notions of local controllability and optimal feedforward control for quantum systems

    Energy Technology Data Exchange (ETDEWEB)

    Chakrabarti, Raj, E-mail: rchakra@purdue.edu [School of Chemical Engineering, Purdue University, West Lafayette, IN 47907 (United States)

    2011-05-06

    Local controllability is an essential concept for regulation and control of time-varying nonlinear dynamical systems; in the classical control logic it is at the foundation of neighboring optimal feedback and feedforward control. We introduce notions of local controllability suited to feedforward control of classical input disturbances in bilinear quantum systems evolving on projective spaces and Lie groups. Tests for local controllability based on a Gramian matrix analogous to the nonlinear local controllability Gramian, which allow assessment of which trajectories can be regulated by perturbative feedforward in the presence of classical input noise, are presented. These notions explicitly incorporate system bilinearity and the geometry of quantum states into the definition of local controllability of quantum systems. Associated feedforward strategies are described.

  13. System design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.; Pounds, T.S.; Smith, S.O.

    1994-01-01

    This document describes the hardware subsystems of the data acquisition and control system (DACS) used in mitigation tests conducted on waste tank SY-101 at the Hanford Nuclear Reservation. The system was designed and implemented by Los Alamos National Laboratory (LANL) and supplied to Westinghouse Hanford Company (WHC). The mitigation testing uses a pump immersed in the waste tank, directed at certain angles and operated at different speeds and time durations. The SY-101 tank has experienced recurrent periodic gas releases of hydrogen, nitrous oxide, ammonia, and (recently discovered) methane. The hydrogen gas represents a danger, as some of the releases are in amounts above the lower flammability limit (LFL). These large gas releases must be mitigated. Several instruments have been added to the tank to monitor the gas compositions, the tank level, the tank temperature, and other parameters. A mixer pump has been developed to stir the tank waste to cause the gases to be released at a slow rate. It is the function of the DACS to monitor those instruments and to control the mixer pump in a safe manner. During FY93 and FY94 the mixer pump was installed with associated testing operations support equipment and a mitigation test project plan was implemented. These activities successfully demonstrated the mixer pump's ability to mitigate the SY-101 tank hydrogen gas hazard

  14. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  15. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  16. The controlled ecological life support system Antarctic analog project: Analysis of wastewater from the South Pole Station, Antarctica, volume 1

    Science.gov (United States)

    Flynn, Michael T.; Bubenheim, David L.; Straight, Christian L.; Belisle, Warren

    1994-01-01

    The Controlled Ecological Life Support system (CELSS) Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and NASA project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. NASA goals are operational testing of CELSS technologies and the conduct of scientific studies to facilitate technology selection and system design. The NSF goals are that the food production, water purification, and waste treatment capabilities which will be provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. This report presents an analysis of wastewater samples taken from the Amundsen-Scott South Pole Station, Antarctica. The purpose of the work is to develop a quantitative understanding of the characteristics of domestic sewage streams at the South Pole Station. This information will contribute to the design of a proposed plant growth/waste treatment system which is part of the CELSS Antarctic Analog Project (CAAP).

  17. Agile Design of Sewer System Control

    NARCIS (Netherlands)

    Van Nooijen, R.P.; Kolechkina, A.G.; Van Leeuwen, P.E.R.M.; Van Velzen, E.

    2011-01-01

    We describe the first part of an attempt to include stakeholder participation in the design of a central automatic controller for a sewer system in a small pilot project (five subcatchments) and present lessons learned so far. The pilot is part of a project aimed at the improvement of water quality

  18. Model Based Control of Refrigeration Systems

    DEFF Research Database (Denmark)

    Larsen, Lars Finn Sloth

    for automation of these procedures, that is to incorporate some "intelligence" in the control system, this project was started up. The main emphasis of this work has been on model based methods for system optimizing control in supermarket refrigeration systems. The idea of implementing a system optimizing...... control is to let an optimization procedure take over the task of operating the refrigeration system and thereby replace the role of the operator in the traditional control structure. In the context of refrigeration systems, the idea is to divide the optimizing control structure into two parts: A part...... optimizing the steady state operation "set-point optimizing control" and a part optimizing dynamic behaviour of the system "dynamical optimizing control". A novel approach for set-point optimization will be presented. The general idea is to use a prediction of the steady state, for computation of the cost...

  19. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  20. B-Plant Canyon Ventilation Control System Description; FINAL

    International Nuclear Information System (INIS)

    MCDANIEL, K.S.

    1999-01-01

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This document describes the CVCS system components which include a Programmable Logic Controller (PLC) coupled with an Operator Interface Unit (OIU) and application software. This document also includes an Alarm Index specifying the setpoints and technical basis for system analog and digital alarms

  1. Fibradapt trademark: Adaptive Wind Turbine Control System; Fibradapt trademark: Adaptive Wind Turbine Control System

    Energy Technology Data Exchange (ETDEWEB)

    Wernicke, J.-Th. [Wind Force Engineering and Consulting GmbH, Bremerhaven (Germany)

    2004-07-01

    The technology of Time Division Multiplexing (TDM) is compared with conventional strain gauge technologies in practical operation in a wind power system. Load cycles in the rotor blade were measured during plant life, and the data were used in plant control. The system is a tool in technical project management and financial management of a wind park. (orig.)

  2. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  3. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  4. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  5. Modular supervisory controller for hybrid power systems

    Energy Technology Data Exchange (ETDEWEB)

    Lemos Pereira, A. de

    2000-06-01

    The power supply of remote places has been commonly provided by thermal power plants, usually diesel generators. Although hybrid power systems may constitute the most economical solution in many applications their widespread application to the electrification schemes of remote areas still depends on improvements in the issues of design and operation control. The main limitations of the present hybrid power systems technology, which are identified in this work, are related to the control and supervision of the power system. Therefore this thesis focuses on the modularity of supervisory controllers in order to design cost-competitive and reliable hybrid power systems. The modular supervisory controller created in this project is considered an important part of a system design approach that aims to overcome the technical difficulties of the current engineering practice and contribute to open the market of hybrid power systems. The term modular refers to a set of design characteristics that allows the use of basically the same supervisory controller in different projects. The modularization and standardisation of the controller include several issues such as interfacing components, communication protocols, modelling, programming and control strategies. The modularity can reduce the highly specialised system engineering related to the integration of components, operation and control. It can also avoid the high costs for installation, service and maintenance. A modular algorithm for supervisory controllers has been developed (a Matlab program called SuperCon) using an object-oriented design and it has been tested through several simulations using different hybrid system configurations and different control strategies. This thesis presents a complete control system design process which can be used as the basis for the development and implementation of intelligent and autonomous supervisory controllers for hybrid power systems with modular characteristics. (au)

  6. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  7. Propose Reactor Control and Monitoring System for RTP

    International Nuclear Information System (INIS)

    Mohd Sabri Minhat; Izhar Abu Hussin; Mohd Idris Taib; Mohd Khairulezwan Abdul Manan; Nurfarhana Ayuni Joha

    2011-01-01

    Reactor control and monitoring system is a one of the important features used in reactor. The control and monitoring must come together to provide safety, excellent performance and reliable in nuclear reactor technology application. Objectives of this technical paper are to design and propose reactor control system and reactor monitoring system in Research Reactor (RTP) for Reactor Upgrading Project. (author)

  8. Control system devices : architectures and supply channels overview.

    Energy Technology Data Exchange (ETDEWEB)

    Trent, Jason; Atkins, William Dee; Schwartz, Moses Daniel; Mulder, John C.

    2010-08-01

    This report describes a research project to examine the hardware used in automated control systems like those that control the electric grid. This report provides an overview of the vendors, architectures, and supply channels for a number of control system devices. The research itself represents an attempt to probe more deeply into the area of programmable logic controllers (PLCs) - the specialized digital computers that control individual processes within supervisory control and data acquisition (SCADA) systems. The report (1) provides an overview of control system networks and PLC architecture, (2) furnishes profiles for the top eight vendors in the PLC industry, (3) discusses the communications protocols used in different industries, and (4) analyzes the hardware used in several PLC devices. As part of the project, several PLCs were disassembled to identify constituent components. That information will direct the next step of the research, which will greatly increase our understanding of PLC security in both the hardware and software areas. Such an understanding is vital for discerning the potential national security impact of security flaws in these devices, as well as for developing proactive countermeasures.

  9. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  10. An Integration Testing Facility for the CERN Accelerator Controls System

    CERN Document Server

    Stapley, N; Bau, J C; Deghaye, S; Dehavay, C; Sliwinski, W; Sobczak, M

    2009-01-01

    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions.

  11. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    Energy Technology Data Exchange (ETDEWEB)

    Girolami, Davide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-17

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  12. Robust control of distributed parameter mechanical systems using a multidimensional systems approach

    Czech Academy of Sciences Publication Activity Database

    Cichy, B.; Augusta, Petr; Rogers, E.; Galkowski, K.; Hurák, Z.

    2010-01-01

    Roč. 58, č. 1 (2010), s. 67-75 ISSN 0239-7269 R&D Projects: GA MŠk(CZ) 1M0567 Institutional research plan: CEZ:AV0Z10750506 Keywords : robust control * distributed parameter mechanical systems * multidimensional systems Subject RIV: BC - Control Systems Theory http://library.utia.cas.cz/separaty/2010/TR/augusta-0347866.pdf

  13. Monitor and Control for PEFP System using EPICS

    International Nuclear Information System (INIS)

    Choi, Hyun Mi; Hong, I. S.; Song, Y. G.; Cho, Y. S.

    2005-01-01

    The construction of PEFP project whose final objective is to build 100 Mev proton accelerator started in 2002 and expected to finish in 2012. In 2005, we have performed 20mA proton beam of 20Mev. For developing the control systems of the 20Mev accelerator as well as 100 Mev accelerator, we chose EPICS(Experimental Physics and Industrial Control System) as the most suitable tool. We have studied EPICS applications for various situation and as the application we developed vacuum control system using EPICS base3.14.4 as the core software and EPICS extensions (e.g., EDM(Extensible Display Manager), MEDM(Motif Editor and Display Manager) etc.) as the user interface. There are a number of projects using EPICS for a broad spectrum of applications. EPICS began as a collaboration between Argonne National Laboratory and Los Alamos National Laboratory in 1991, building on work that was initially done at the ground test Accelerator. It is now running on accelerators that have as many as 180 distributed front-end controllers and control rooms with 20 consoles and a gateway to make system parameters available to offices, web site, and other remote control stations. It is also used at single controller and one workstation systems. We use the EPICS tool kit as a foundation of the control system. We developed a vacuum monitor, RFQ, DTL Turbo pump control system for use Ethernet Multi Serial Deice Severs on PEFP control system. The control system now shows stable and reliable characteristics enough to meet our control requirement. However, the control system is continuously being upgraded to accommodate additional control requirements such as vacuum device control

  14. Oxygen control systems and impurity purification in LBE: Learning from DEMETRA project

    Energy Technology Data Exchange (ETDEWEB)

    Brissonneau, L., E-mail: laurent.brissonneau@cea.fr [CEA/DEN, Cadarache, DTN/STPA/LIPC, F-13108 Saint-Paul-lez-Durance (France); Beauchamp, F.; Morier, O. [CEA/DEN, Cadarache, DTN/STPA/LIPC, F-13108 Saint-Paul-lez-Durance (France); Schroer, C.; Konys, J. [Karlsruher Institut fuer Technologie (KIT), Institut fuer Materialforschung III, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Kobzova, A.; Di Gabriele, F. [NRI, UJV Husinec-Rez 130, Rez 25068 (Czech Republic); Courouau, J.-L. [CEA/DEN, Saclay, DPC/SCCME/LECNA, F-919191 Gif-sur-Yvette (France)

    2011-08-31

    Operating a system using Lead-Bismuth Eutectic (LBE) requires a control of the dissolved oxygen concentration to avoid corrosion of structural materials and oxide build-up in the coolant. Reliable devices are therefore needed to monitor and adjust the oxygen concentration and to remove impurities during operation. In this article, we describe the learning gained from experiments run in the framework of the DEMETRA project (IP-EUROTRANS 6th FP contract) on the oxygen supply in LBE and on impurity filtration and management in different European facilities. An oxygen control device should supply oxygen in LBE at sufficient rate to compensate loss by surface oxidation, otherwise local dissolution of oxide layers might lead to the loss of steel protection against dissolution. Oxygen can be supplied by gas phase H{sub 2}O or O{sub 2}, or by solid phase, PbO dissolution. Each of these systems has substantial advantages and drawbacks. Considerations are given on devices for large scale facilities. The management of impurities (lead oxides and corrosion products) is also a crucial issue as their presence in the liquid phase or in the aerosols is likely to impair the facility, instrumentation and mechanical devices. To avoid impurity build-up on the long-term, purification of LBE is required to keep the impurity inventory low by trapping oxide and metallic impurities in specific filter units. On the basis of impurities characterisation and experimental results gained through filtration tests in different loops, this paper gives a description of the state-of-art knowledge of LBE purification with different filter media. It is now understood that the nature and behaviour of impurities formed in LBE will change according to the operating modes as well as the method to propose to remove impurities. This experience can be used to validate the basis filtration process, define the operating procedures and evaluate perspectives for the design of purification units for long

  15. Artificial intelligence/expert (AI/EX) systems for steelworks pollution control

    Energy Technology Data Exchange (ETDEWEB)

    Schofield, N.; Le Louer, P.; Mirabile, D.; Hubner, R. [Corus UK Ltd., Rotherham (United Kingdom)

    2002-07-01

    The objectives of this project have been to develop and apply artificial intelligence and expert system (AI/EX) methods to improve the control and operational performance of steelworks' pollution control equipment and to assess the viability and benefits of using such systems in dynamic process plant applications. Four distinct sub-projects were carried out: an expert system incorporating knowledge-based rules and neural network simulations has been developed by Corus which provides plant personnel with a real-time condition monitoring tool for the plant. Abnormalities with plant operation are now instantly recognised and alarmed, allowing prioritised maintenance to increase plant availability. The LECES project focused on studies concerning three different sites in order to evaluate predictive emission monitoring systems using neural networks to replace conventional instrumental and controls in steelworks' combustion systems. VAI developed a software template for pollution control expert systems to demonstrate the transferability of AI/EX technology. This has been done through the development of a validated process database containing data from the Corus sub-project and the subsequent integration of this data with dynamic emission models to produce rules for input to an evaluation database. CSM developed a fuzzy logic controlled process management system applied to the biological treatment of coke-oven waste water. A pilot plant has been installed and results on simulations performed using the fuzzy logic system linked to a neural network simulator show that it is possible to obtain great advantages in the biological pilot plant performance.

  16. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  17. Experiences with IAEA project: TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques (RER/2/004)

    International Nuclear Information System (INIS)

    Glavic-Cindro, Denis; Korun, Matjaz

    2002-01-01

    In the TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques RER/2/004, 12 laboratories from east and central European countries participated. Within this project 4 workshops, 2 audit inspections and 2 proficiency tests were organized. The aim of this project was to help these laboratories to implement quality assurance system based on the ISO 17025 standard and to help them on the way towards accreditation. (author)

  18. Integrated control and diagnostic system architectures for future installations

    International Nuclear Information System (INIS)

    Wood, R.; March-Leuba, J.

    2000-01-01

    Nuclear reactors of the 21st century will employ increasing levels of automation and fault tolerance to increase availability, reduce accident risk, and lower operating costs. Key developments in control algorithms, fault diagnostics, fault tolerance, and distributed communications are needed to implement the fully automated plant. It will be equally challenging to integrate developments in separate information and control fields into a cohesive system, which collectively achieves the overall goals of improved safety, reliability, maintainability, and cost-effectiveness. Under the Nuclear Energy Research Initiative (NERI), the US Department of Energy is sponsoring a project to address some of the technical issues involved in meeting the long-range goal of 21st century reactor control systems. This project involves researchers from Oak Ridge National Laboratory, the University of Tennessee, and North Carolina State University. The research tasks under this project focus on some of the first-level breakthroughs in control design, diagnostic techniques, and information system design that will provide a path to enable the design process to be automated in the future. This paper describes the conceptual development of an integrated nuclear plant control and information system architecture, which incorporates automated control system development that can be traced to a set of technical requirements. The expectation is that an integrated plant architecture with optimal control and efficient use of diagnostic information can reduce the potential for operational errors and minimize challenges to the plant safety systems

  19. A gesture-controlled projection display for CT-guided interventions.

    Science.gov (United States)

    Mewes, A; Saalfeld, P; Riabikin, O; Skalej, M; Hansen, C

    2016-01-01

    The interaction with interventional imaging systems within a sterile environment is a challenging task for physicians. Direct physician-machine interaction during an intervention is rather limited because of sterility and workspace restrictions. We present a gesture-controlled projection display that enables a direct and natural physician-machine interaction during computed tomography (CT)-based interventions. Therefore, a graphical user interface is projected on a radiation shield located in front of the physician. Hand gestures in front of this display are captured and classified using a leap motion controller. We propose a gesture set to control basic functions of intervention software such as gestures for 2D image exploration, 3D object manipulation and selection. Our methods were evaluated in a clinically oriented user study with 12 participants. The results of the performed user study confirm that the display and the underlying interaction concept are accepted by clinical users. The recognition of the gestures is robust, although there is potential for improvements. The gesture training times are less than 10 min, but vary heavily between the participants of the study. The developed gestures are connected logically to the intervention software and intuitive to use. The proposed gesture-controlled projection display counters current thinking, namely it gives the radiologist complete control of the intervention software. It opens new possibilities for direct physician-machine interaction during CT-based interventions and is well suited to become an integral part of future interventional suites.

  20. Complex Projective Synchronization in Drive-Response Stochastic Complex Networks by Impulsive Pinning Control

    Directory of Open Access Journals (Sweden)

    Xuefei Wu

    2014-01-01

    Full Text Available The complex projective synchronization in drive-response stochastic coupled networks with complex-variable systems is considered. The impulsive pinning control scheme is adopted to achieve complex projective synchronization and several simple and practical sufficient conditions are obtained in a general drive-response network. In addition, the adaptive feedback algorithms are proposed to adjust the control strength. Several numerical simulations are provided to show the effectiveness and feasibility of the proposed methods.

  1. Mechatronic Control Engineering: A Problem Oriented And Project Based Learning Curriculum In Mechatronic

    DEFF Research Database (Denmark)

    Pedersen, Henrik Clemmensen; Andersen, Torben Ole; Hansen, Michael Rygaard

    2008-01-01

    Mechatronics is a field of multidisciplinary engineering that not only requires knowledge about different technical areas, but also insight into how to combine technologies optimally, to design efficient products and systems.This paper addresses the group project based and problem-oriented learning...... the well established methods from control engineering form very powerful techniques in both analysis and synthesis of mechatronic systems. The necessary skills for mechatronic engineers are outlined followed up by a discussion on how problem oriented project based learning is implemented. A complete...... curriculum named Mechatronic Control Engineering is presented, which is started at Aalborg University, Denmark, and the content of the semesters and projects are described. The projects are all characterized by the use of simulation and control for the purpose of analyzing and designing complex commercial...

  2. On the control of distributed parameter systems using a multidimensional systems setting

    Czech Academy of Sciences Publication Activity Database

    Cichy, B.; Augusta, Petr; Rogers, E.; Galkowski, K.; Hurák, Z.

    2008-01-01

    Roč. 22, č. 7 (2008), s. 1566-1581 ISSN 0888-3270 R&D Projects: GA MŠk(CZ) 1M0567 Institutional research plan: CEZ:AV0Z10750506 Keywords : Distributed parameter systems * Modelling * Control law design Subject RIV: BC - Control Systems Theory Impact factor: 1.984, year: 2008

  3. Acousto-optic laser projection systems for displaying TV information

    International Nuclear Information System (INIS)

    Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V

    2015-01-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  4. Acousto-optic laser projection systems for displaying TV information

    Science.gov (United States)

    Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.

    2015-04-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.

  5. Acousto-optic laser projection systems for displaying TV information

    Energy Technology Data Exchange (ETDEWEB)

    Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)

    2015-04-30

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  6. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  7. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  8. Control system modelling for superconducting accelerator

    International Nuclear Information System (INIS)

    Czarski, T.; Pozniak, K.; Romaniuk, R.

    2006-01-01

    A digital control of superconducting cavities for a linear accelerator is presented. The LLRF - Low Level Radio Frequency system for FLASH project in DESY is introduced. FPGA based controller supported by MATLAB system was developed to investigate the novel firmware implementation. Algebraic model in complex domain is proposed for the system analyzing. Calibration procedure of a signal path is considered for a multi-channel control. Identification of the system parameters is carried out by the least squares method application. Control tables: Feed-Forward and Set- Point are determined for the required cavity performance, according to the recognized process. Feedback loop is tuned by fitting a complex gain of a corrector unit. Adaptive control algorithm is applied for feed-forward and feedback modes. Experimental results are presented for a cavity representative operation. (orig.)

  9. Timing and control monitor system upgrade design document. Version 4

    International Nuclear Information System (INIS)

    Brandt, J.J.

    1984-01-01

    This is a design document for the Timing and Control Monitor System Upgrade Project. This project is intended to provide a replacement system for the existing user Encoder Monitor Systems and Varian 72 Control Room computer systems. All of these systems reside at the Nevada Test Site. The function of the T and C Monitor System is to gather real-time statistics and data on user defined key variables from control, communication, data acquistion systems, and from the monitoring system itself. The control, communication, and data acquisition systems each operate separately from the monitor system. The T and C Monitor System gathers this data in order to verify the readiness of an event to begin countdown. This includes setup, verification, calibration, and peripheral services, report any failures that may occur during the countdown, verify detonation and containment, and assist reentry activities after the event

  10. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  11. Computer control system of TRISTAN

    International Nuclear Information System (INIS)

    Kurokawa, Shin-ichi; Shinomoto, Manabu; Kurihara, Michio; Sakai, Hiroshi.

    1984-01-01

    For the operation of a large accelerator, it is necessary to connect an enormous quantity of electro-magnets, power sources, vacuum equipment, high frequency accelerator and so on and to control them harmoniously. For the purpose, a number of computers are adopted, and connected with a network, in this way, a large computer system for laboratory automation which integrates and controls the whole system is constructed. As a distributed system of large scale, the functions such as electro-magnet control, file processing and operation control are assigned to respective computers, and the total control is made feasible by network connection, at the same time, as the interface with controlled equipment, the CAMAC (computer-aided measurement and control) is adopted to ensure the flexibility and the possibility of expansion of the system. Moreover, the language ''NODAL'' having network support function was developed so as to easily make software without considering the composition of more complex distributed system. The accelerator in the TRISTAN project is composed of an electron linear accelerator, an accumulation ring of 6 GeV and a main ring of 30 GeV. Two ring type accelerators must be synchronously operated as one body, and are controlled with one computer system. The hardware and software are outlined. (Kako, I.)

  12. Eye Gaze Controlled Projected Display in Automotive and Military Aviation Environments

    Directory of Open Access Journals (Sweden)

    Gowdham Prabhakar

    2018-01-01

    Full Text Available This paper presents an eye gaze controlled projected display that can be used in aviation and automotive environment as a head up display. We have presented details of the hardware and software used in developing the display and an algorithm to improve performance of point and selection tasks in eye gaze controlled graphical user interface. The algorithm does not require changing layout of an interface; it rather puts a set of hotspots on clickable targets using a Simulated Annealing algorithm. Four user studies involving driving and flight simulators have found that the proposed projected display can improve driving and flying performance and significantly reduce pointing and selection times for secondary mission control tasks compared to existing interaction systems.

  13. Regulation on control systems tests

    International Nuclear Information System (INIS)

    Grau, J.; Navarro, J.M.

    1978-01-01

    Requirements under regulation applicable to the testing of control systems and controlled equipments in the case of USA nuclear projects are examined. They are reviewed, in particular, the following standards and criteria: 10 Code of Federal Regulations 50, Appendix A, General Design Criteria 20 and 21; IEEE Standards 279 and 308; IEEE Standard 338; US Regulatory Guides 1.22 and 1.118.(J.E.de C.)

  14. Project control support services for the National Waste Terminal Storage Program

    International Nuclear Information System (INIS)

    1977-12-01

    The Boeing Engineering and Construction Company has the responsibility to recommend and assist in designing and implementing a project control system for the Office of Waste Isolation. BEC, after analysis of the OWI management structure and techniques utilized, has recommended the implementation of a Program Control System (PCS) for use by OWI. This system embraces the scope of management needs for visibility and control of cost and schedule performance as well as providing a framework for all the various segments of a complete program control system. Because of the schedule constraints placed on OWI by DOE it was not deemed practical to implement all segments of PCS but rather those that are basic to the concept and can return the greatest short-term benefit. The area of cost and schedule control appears to provide the greatest benefit when combined with the control room techniques for visibility and control. Technical performance is not covered in this report. The segment of PCS titled Integrated Cost/Schedule (IC/S) was used to identify those functions unique to cost and schedule control

  15. FY1995 distributed control of man-machine cooperative multi agent systems; 1995 nendo ningen kyochogata multi agent kikai system no jiritsu seigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the near future, distributed autonomous systems will be practical in many situations, e.g., interactive production systems, hazardous environments, nursing homes, and individual houses. The agents which consist of the distributed system must not give damages to human being and should be working economically. In this project man-machine cooperative multi agent systems are studied in many kind of respects, and basic design technology, basic control technique are developed by establishing fundamental theories and by constructing experimental systems. In this project theoretical and experimental studies are conducted in the following sub-projects: (1) Distributed cooperative control in multi agent type actuation systems (2) Control of non-holonomic systems (3) Man-machine Cooperative systems (4) Robot systems learning human skills (5) Robust force control of constrained systems In each sub-project cooperative nature between machine agent systems and human being, interference between artificial multi agents and environment and new function emergence in coordination of the multi agents and the environment, robust force control against for the environments, control methods for non-holonomic systems, robot systems which can mimic and learn human skills were studied. In each sub-project, some problems were hi-lighted and solutions for the problems have been given based on construction of experimental systems. (NEDO)

  16. 4{sup th} Annual workshop proceedings of the collaborative project ''Redox phenomena controlling systems'' (7{sup th} EC FP CP RECOSY)

    Energy Technology Data Exchange (ETDEWEB)

    Altmaier, Marcus; Kienzler, Bernhard; Duro, Lara; Grive, Mireia; Montoya, Vanessa (eds.)

    2012-07-01

    The EURATOM 7{sup th} EC Framework Program Collaborative Project REdox phenomena Controlling SYstems (RECOSY) started in April 2008 and extends over 4 years. Although redox is not a new geochemical issue, different questions are still not resolved. For this reason, main objectives of RECOSY project are a) the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal, b) providing tools to apply the result to Performance Assessment/Safety Case, c) training of next generation and d) documentation and communication of the results. To this aim, the project set up a consortium of 32 Beneficiaries/Contractors and 6 Associated Groups. The consortium includes key European Research Institutes, Universities, National Waste Management Agencies and SMEs, from 13 EURATOM signatory states, Russia, Japan, Korea, USA and one European Joint Research Centre. The ReCosy concept is innovative in the scientific approach to the redox phenomena. It includes i) advanced analytical tools, ii) investigations of processes responsible for redox control (thermodynamically and kinetically controlled processes, surface reactions and microbial processes,..), iii) provision of required data on redox controlling processes, and iv) response to disturbances in disposal systems. The work program is structured along six RTD workpackages (WP1-6). They cover near-field and far field aspects as well as all relevant host-rocks considered in Europe. In WP1, the scientific state-of-the-art and its application to Performance Assessment/Safety Case is documented and regularly updated. WP2 focuses on development of redox determination methods. WP3 focuses on redox response of defined and near-natural systems. WP4 studies the redox reactions of radionuclides. WP5 focuses on Redox processes in radionuclide transport and WP6 deals with redox reactions affecting the spent fuel source-term. Specific workpackages on knowledge management, education

  17. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  18. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  19. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  20. HESYRL control system status

    International Nuclear Information System (INIS)

    Yao Chihyuan

    1992-01-01

    HESYRL synchrotron radiation storage ring was completed in 1989 and has been in commissioning since then. Now it has met its design specification and is ready for synchrotron light experiments. Control system of the project was completed in 1989 and some modifications were made during commissioning. This paper describes its present configuration, status and upgrading plan. (author)

  1. Project and implementation of the control system for the microtron accelerator

    International Nuclear Information System (INIS)

    Malafronte, Alexandre Almeida

    2008-01-01

    The racetrack microtron under construction at the Instituto de Fisica da Universidade de Sao Paulo, is a recirculated electron accelerator that has a few hundred parameters to be monitored and controlled. These parameters belong to several subsystems like transport, vacuum, RF, and diagnostics. To decrease the cognitive burden of the operator and help him to control the machine a computerized control system was built, pervading all subsystems. This system allows the operator to measure and change the parameters of interest, or alerts him when some of these parameters exceed a pre-defined value. The system was built using the three-layer model methodology: input and output device layer; device server layer; and the user interface layer. In the input and output device layer, several instruments with different communication interfaces were used, either commercial or in-house built. In the device server layer industrial PCs were used. The user interface layer uses a conventional PC running a human-computer interface built with assistance of the Lab Windows/CVI software (National Instruments). The control system must satisfy requirements of flexibility, upgradability and cost, must stand during the accelerator lifetime and allow maintenance by the Lab's technical support. (author)

  2. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  3. Life Support Systems: Trace Contaminant and Particulate Control

    Data.gov (United States)

    National Aeronautics and Space Administration — Advanced Exploration Systems (AES) Life Support Systems project Trace Contaminant and Particulate Control task: Work in the area of trace contamination and...

  4. INL Control System Situational Awareness Technology Annual Report 2012

    Energy Technology Data Exchange (ETDEWEB)

    Gordon Rueff; Bryce Wheeler; Todd Vollmer; Tim McJunkin; Robert Erbes

    2012-10-01

    The overall goal of this project is to develop an interoperable set of tools to provide a comprehensive, consistent implementation of cyber security and overall situational awareness of control and sensor network implementations. The operation and interoperability of these tools will fill voids in current technological offerings and address issues that remain an impediment to the security of control systems. This report provides an FY 2012 update on the Sophia, Mesh Mapper, Intelligent Cyber Sensor, and Data Fusion projects with respect to the year-two tasks and annual reporting requirements of the INL Control System Situational Awareness Technology report (July 2010).

  5. Canada: Darlington NPP. Project Control. Annex 4

    International Nuclear Information System (INIS)

    Wieckowski, G.

    1999-01-01

    This annex deals with project control. The just slowed down and delayed. Senior engineering, construction and procurement staff stayed with the project. Documentation was preserved though normal functioning of the records department project was completed and put into service with a few years' delay. (author)

  6. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  7. Direct Energy Centre underground parking integrated light control system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-10-15

    LightSavers is a project undertaken by the Toronto Atmospheric Fund to accelerate the use of lighting technologies. As part of the project a pilot test has been carried out in the Direct Energy Center in Toronto. The aim of this report is to present the study and its results. The Direct Energy Center is a large event facility with an large underground parking facility. A lighting energy management system, the energy control system (ECS), capable of adjusting lighting levels based on occupancy was implemented in the centre and data was collected during over one year. Results showed that the ECS permitted a reduction in energy consumption and thus greenhouse gas emissions by 47% and the payback will take less than 6 years. This project demonstrated that the energy control system provides better energy, environmental and economic performance than a traditional automation system.

  8. An analysis of the control hierarchy modelling of the CMS detector control system

    NARCIS (Netherlands)

    Hwong, Y.L.; Groote, J.F.; Willemse, T.A.C.

    2009-01-01

    The high level Detector Control System (DCS) of the CMS experiment is modelled using Finite State Machines (FSM), which cover the control application behaviours of all the sub-detectors and support services. The Joint Controls Project (JCOP) at CERN has chosen the SMI++ framework for this purpose.

  9. Generalized dislocated lag function projective synchronization of fractional order chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wang, Cong; Zhang, Hong-li; Fan, Wen-hui

    2017-01-01

    In this paper, we propose a new method to improve the safety of secure communication. This method uses the generalized dislocated lag projective synchronization and function projective synchronization to form a new generalized dislocated lag function projective synchronization. Moreover, this paper takes the examples of fractional order Chen system and Lü system with uncertain parameters as illustration. As the parameters of the two systems are uncertain, the nonlinear controller and parameter update algorithms are designed based on the fractional stability theory and adaptive control method. Moreover, this synchronization form and method of control are applied to secure communication via chaotic masking modulation. Many information signals can be recovered and validated. Finally, simulations are used to show the validity and feasibility of the proposed scheme.

  10. Optimally Controlled Flexible Fuel Powertrain System

    Energy Technology Data Exchange (ETDEWEB)

    Hakan Yilmaz; Mark Christie; Anna Stefanopoulou

    2010-12-31

    The primary objective of this project was to develop a true Flex Fuel Vehicle capable of running on any blend of ethanol from 0 to 85% with reduced penalty in usable vehicle range. A research and development program, targeting 10% improvement in fuel economy using a direct injection (DI) turbocharged spark ignition engine was conducted. In this project a gasoline-optimized high-technology engine was considered and the hardware and configuration modifications were defined for the engine, fueling system, and air path. Combined with a novel engine control strategy, control software, and calibration this resulted in a highly efficient and clean FFV concept. It was also intended to develop robust detection schemes of the ethanol content in the fuel integrated with adaptive control algorithms for optimized turbocharged direct injection engine combustion. The approach relies heavily on software-based adaptation and optimization striving for minimal modifications to the gasoline-optimized engine hardware system. Our ultimate objective was to develop a compact control methodology that takes advantage of any ethanol-based fuel mixture and not compromise the engine performance under gasoline operation.

  11. General methods for modified projective synchronization of hyperchaotic systems with known or unknown parameters

    Science.gov (United States)

    Tang, Yang; Fang, Jian-an

    2008-03-01

    This work is concerned with the general methods for modified projective synchronization of hyperchaotic systems. A systematic method of active control is developed to synchronize two hyperchaotic systems with known parameters. Moreover, by combining the adaptive control and linear feedback methods, general sufficient conditions for the modified projective synchronization of identical or different chaotic systems with fully unknown or partially unknown parameters are presented. Meanwhile, the speed of parameters identification can be regulated by adjusting adaptive gain matrix. Numerical simulations verify the effectiveness of the proposed methods.

  12. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  13. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    The bestselling project management text for students andprofessionals-now updated and expanded This Eleventh Edition of the bestselling "bible" ofproject management maintains the streamlined approach of the prioreditions and moves the content even closer to PMI's ProjectManagement Body of Knowledge (PMBOK). New content has been added tothis edition on measuring project management ROI, value to theorganization and to customers, and much more. The capstone "super"case on the "Iridium Project" has been maintained, covering allaspects of project management. Increased use of sidebars throughoutthe book helps further align it with the PMBOK and the ProjectManagement Professional (PMP) Certification Exam. This new edition features significant expansion, including morethan three dozen entirely new sections and updates on processsupporting; types of project closure; project sponsorship; andculture, teamwork, and trust. This comprehensive guide to theprinciples and practices of project management: Offers new sections...

  14. Studies of some phenomena in control engineering projects - With application to precipitation processes

    Energy Technology Data Exchange (ETDEWEB)

    Stoele-Hansen, Kjell

    1998-12-31

    This thesis deals with the life-cycle of a control engineering project and some phenomena encountered in such projects. Different types of control strategies are discussed and an attempt is made to classify them into categories. Some case projects are presented and forms the basis for discussing the individual`s role in a change project. Further conditions for successful implementation of new control strategies are discussed in general, but also conditions for successful implementation of new control strategies at a process section of a nickel work. Procedures for implementing new control strategies are treated and some remarks are made about operation of control strategies. An introduction is given to the modelling of precipitation in pH systems and different model formulations are discused. The modelling of pH controlled precipitations is discussed in general. A variety of dynamic models, ranging from complex to simple, are proposed and discussed. A rigorous dynamic nonlinear mechanistic model of a precipitation reactor is developed. It is based on the theory of reaction invariants and variants. The model is verified against real process data. The dynamics and characteristics of the precipitation reactor are analysed and some remarks are made with respect to controllability. A new strategy for pH control is proposed. A new model based strategy for controlling the precipitation reactions is also proposed. 93 refs., 63 figs., 10 tabs.

  15. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  16. Decentralized H-infinity control of complex systems with delayed feedback

    Czech Academy of Sciences Publication Activity Database

    Bakule, Lubomír; Rehák, Branislav; Papík, Martin

    2016-01-01

    Roč. 67, č. 1 (2016), s. 127-131 ISSN 0005-1098 R&D Projects: GA ČR GA13-02149S Institutional support: RVO:67985556 Keywords : decentralized control * H-infinity control * large-scale systems * Fault-tolerant systems Subject RIV: BC - Control Systems Theory Impact factor: 5.451, year: 2016

  17. Computer Controlled Portable Greenhouse Climate Control System for Enhanced Energy Efficiency

    Science.gov (United States)

    Datsenko, Anthony; Myer, Steve; Petties, Albert; Hustek, Ryan; Thompson, Mark

    2010-04-01

    This paper discusses a student project at Kettering University focusing on the design and construction of an energy efficient greenhouse climate control system. In order to maintain acceptable temperatures and stabilize temperature fluctuations in a portable plastic greenhouse economically, a computer controlled climate control system was developed to capture and store thermal energy incident on the structure during daylight periods and release the stored thermal energy during dark periods. The thermal storage mass for the greenhouse system consisted of a water filled base unit. The heat exchanger consisted of a system of PVC tubing. The control system used a programmable LabView computer interface to meet functional specifications that minimized temperature fluctuations and recorded data during operation. The greenhouse was a portable sized unit with a 5' x 5' footprint. Control input sensors were temperature, water level, and humidity sensors and output control devices were fan actuating relays and water fill solenoid valves. A Graphical User Interface was developed to monitor the system, set control parameters, and to provide programmable data recording times and intervals.

  18. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  19. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  20. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  1. Function Projective Synchronization in Discrete-Time Chaotic System with Uncertain Parameters

    International Nuclear Information System (INIS)

    Chen Yong; Li Xin

    2009-01-01

    The function projective synchronization of discrete-time chaotic systems is presented. Based on backstepping design with three controllers, a systematic, concrete and automatic scheme is developed to investigate function projective synchronization (FPS) of discrete-time chaotic systems with uncertain parameters. With the aid of symbolic-numeric computation, we use the proposed scheme to illustrate FPS between two identical 3D Henon-like maps with uncertain parameters. Numeric simulations are used to verify the effectiveness of our scheme. (general)

  2. C-106 tank sluicer control system

    International Nuclear Information System (INIS)

    Bellomy, J.R.

    1997-01-01

    Acceptance Test Report for the Sluicer Control System, Project W-320 This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the C-Farm tank C-106 sluicer functions as required by the design criteria

  3. Strategies of design, development and activation of the Nova control system

    International Nuclear Information System (INIS)

    Holloway, F.W.

    1983-01-01

    Nova and Novette are large complex experimental laser facilities which require extensive and sophisticated control systems for their successful operation. Often, in major controls projects, certain invisible aspects of the project, such as overall strategy, management, resources and historical constraints, have a more profound effect upon success than any specific hardware/software design. The design and performance of the Nova/Novette laser control system will be presented with special emphasis upon these often controversial aspects

  4. Strategies of design, development and activation of the Nova control system

    Energy Technology Data Exchange (ETDEWEB)

    Holloway, F.W.

    1983-06-30

    Nova and Novette are large complex experimental laser facilities which require extensive and sophisticated control systems for their successful operation. Often, in major controls projects, certain invisible aspects of the project, such as overall strategy, management, resources and historical constraints, have a more profound effect upon success than any specific hardware/software design. The design and performance of the Nova/Novette laser control system will be presented with special emphasis upon these often controversial aspects.

  5. Need an Information Security in Access Control System?

    Directory of Open Access Journals (Sweden)

    V. R. Petrov

    2011-12-01

    Full Text Available The purpose of this paper is the general problems of information security in access control system. The field of using is the in project of reconstruction Physical protection system.

  6. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  7. Master Console System Monitoring and Control Development

    Science.gov (United States)

    Brooks, Russell A.

    2013-01-01

    The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.

  8. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  9. Selected Aircraft Throttle Controller With Support Of Fuzzy Expert Inference System

    Directory of Open Access Journals (Sweden)

    Żurek Józef

    2014-12-01

    Full Text Available The paper describes Zlin 143Lsi aircraft engine work parameters control support method – hourly fuel flow as a main factor under consideration. The method concerns project of aircraft throttle control support system with use of fuzzy logic (fuzzy inference. The primary purpose of the system is aircraft performance optimization, reducing flight cost at the same time and support proper aircraft engine maintenance. Matlab Software and Fuzzy Logic Toolbox were used in the project. Work of the system is presented with use of twenty test samples, five of them are presented graphically. In addition, system control surface, included in the paper, supports system all work range analysis.

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Laboratory use of industrial control systems

    International Nuclear Information System (INIS)

    Rijllart, A.; Avot, L.; Brahy, D.; Jegou, D.; Saban, R.

    1994-01-01

    Industrial control system manufacturers supply the building blocks for the control of industrial equipment or specific process control applications. Although the laboratory environment is different in many aspects (prototyping, evolution and frequent reconfiguration), the use of these building blocks remain attractive because of their general purpose nature, their cost and the large spectrum of available types. In this paper we present three projects which have been implemented using both industrial control system building blocks (PLCs, controllers, digital and analogue plug-in I/O cards) and commercial software packages (LabView and VisualBasic) for the man-machine interface, the data acquisition and archiving, and the process control. This approach has proved to be economical, easy and fast to implement. ((orig.))

  12. Secure digital communication using controlled projective synchronisation of chaos

    International Nuclear Information System (INIS)

    Chee, C.Y.; Xu Daolin

    2005-01-01

    A new approach to chaos communication is proposed to encrypt digital information using controlled projective synchronisation. The scheme encrypts a binary sequence by manipulating the scaling feature of synchronisation from the coupled system. The transmitted signal therefore embeds only a single set of statistical properties. This prevents cryptanalysts from breaking the chaotic encryption scheme by using characteristic cryptanalysis that aims to detect switching of statistical properties in the intercepted information carrier signal. Pseudo-random switching key is incorporated into the scheme to masked out the deterministic nature of the underlying coupled system

  13. Overview of MFTF supervisory control and diagnostics system software

    International Nuclear Information System (INIS)

    Ng, W.C.

    1979-01-01

    The Mirror Fusion Test Facility (MFTF) at the Lawrence Livermore Laboratory (LLL) is currently the largest mirror fusion research project in the world. Its Control and Diagnostics System is handled by a distributed computer network consisting of nine Interdata minicomputer systems and about 65 microprocessors. One of the design requirements is tolerance of single-point failure. If one of the computer systems becomes inoperative, the experiment can still be carried out, although the system responsiveness to operator command may be degraded. In a normal experiment cycle, the researcher can examine the result of the previous experiment, change any control parameter, fire a shot, collect four million bytes of diagnostics data, perform intershot analysis, and have the result presented - all within five minutes. The software approach adopted for the Supervisory Control and Diagnostics System features chief programmer teams and structured programming. Pascal is the standard programming language in this project

  14. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  15. Climate Change Impacts on Sediment Transport In a Lowland Watershed System: Controlling Processes and Projection

    Science.gov (United States)

    al Aamery, N. M. H.; Mahoney, D. T.; Fox, J.

    2017-12-01

    Future climate change projections suggest extreme impacts on watershed hydrologic systems for some regions of the world including pronounced increases in surface runoff and instream flows. Yet, there remains a lack of research focused on how future changes in hydrologic extremes, as well as relative hydrologic mean changes, impact sediment redistribution within a watershed and sediment flux from a watershed. The authors hypothesized that variations in mean and extreme changes in turn may impact sediments in depositional and erosional dominance in a manner that may not be obvious to the watershed manager. Therefore, the objectives of this study were to investigate the inner processes connecting the combined effect of extreme climate change projections on the vegetation, upland erosion, and instream processes to produce changes in sediment redistribution within watersheds. To do so, research methods were carried out by the authors including simulating sediment processes in forecast and hindcast periods for a lowland watershed system. Publically available climate realizations from several climate factors and the Soil Water Assessment Tool (SWAT) were used to predict hydrologic conditions for the South Elkhorn Watershed in central Kentucky, USA to 2050. The results of the simulated extreme and mean hydrological components were used in simulating upland erosion with the connectivity processes consideration and thereafter used in building and simulating the instream erosion and deposition of sediment processes with the consideration of surface fine grain lamina (SFGL) layer controlling the benthic ecosystem. Results are used to suggest the dominance of erosional and depositional redistribution of sediments under different scenarios associated with extreme and mean hydrologic forecasting. The results are discussed in reference to the benthic ecology of the stream system providing insight on how water managers might consider sediment redistribution in a changing climate.

  16. Project-Based Learning in Programmable Logic Controller

    Science.gov (United States)

    Seke, F. R.; Sumilat, J. M.; Kembuan, D. R. E.; Kewas, J. C.; Muchtar, H.; Ibrahim, N.

    2018-02-01

    Project-based learning is a learning method that uses project activities as the core of learning and requires student creativity in completing the project. The aims of this study is to investigate the influence of project-based learning methods on students with a high level of creativity in learning the Programmable Logic Controller (PLC). This study used experimental methods with experimental class and control class consisting of 24 students, with 12 students of high creativity and 12 students of low creativity. The application of project-based learning methods into the PLC courses combined with the level of student creativity enables the students to be directly involved in the work of the PLC project which gives them experience in utilizing PLCs for the benefit of the industry. Therefore, it’s concluded that project-based learning method is one of the superior learning methods to apply on highly creative students to PLC courses. This method can be used as an effort to improve student learning outcomes and student creativity as well as to educate prospective teachers to become reliable educators in theory and practice which will be tasked to create qualified human resources candidates in order to meet future industry needs.

  17. Project W-314 DST and DCRT instrument and control systems, initial assessment

    International Nuclear Information System (INIS)

    Acree, C.D.

    1996-01-01

    This report contains an assessment of the instrument and control systems in the Double Shell Tank Farms and the 244-A DCRT. The assessment report contains data from physical inspection activities and an overall engineering assessment of the instruments and control systems in use in the Double Shell Tanks

  18. Factors influencing the profitability of optimizing control systems

    International Nuclear Information System (INIS)

    Broussaud, A.; Guyot, O.

    1999-01-01

    Optimizing control systems supplement conventional Distributed Control Systems and Programmable Logic Controllers. They continuously implement set points, which aim at maximizing the profitability of plant operation. They are becoming an integral part of modern mineral processing plants. This trend is justified by economic considerations, optimizing control being among the most cost-effective methods of improving metallurgical plant performance. The paper successively analyzes three sets of factors, which influence the profitability of optimizing control systems, and provides guidelines for analyzing the potential value of an optimizing control system at a given operation: external factors, such as economic factors and factors related to plant feed; features of the optimizing control system; and subsequent maintenance of the optimizing control system. It is shown that pay back times for optimization control projects are typically measured in days. The OCS software used by the authors for their applications is described briefly. (author)

  19. Function projective lag synchronization of fractional-order chaotic systems

    International Nuclear Information System (INIS)

    Wang Sha; Yu Yong-Guang; Wang Hu; Rahmani Ahmed

    2014-01-01

    Function projective lag synchronization of different structural fractional-order chaotic systems is investigated. It is shown that the slave system can be synchronized with the past states of the driver up to a scaling function matrix. According to the stability theorem of linear fractional-order systems, a nonlinear fractional-order controller is designed for the synchronization of systems with the same and different dimensions. Especially, for two different dimensional systems, the synchronization is achieved in both reduced and increased dimensions. Three kinds of numerical examples are presented to illustrate the effectiveness of the scheme. (general)

  20. Design project of the dosimetry control system in the independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Vol. V

    International Nuclear Information System (INIS)

    1964-01-01

    Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels includes the following: calculations of CO 2 gas activity, design of the dosimetry control system, review of the changes that should be done in the RA reactor building for installing the independent CO 2 loop, specification of the materials with cost estimation, engineering drawings of the system [sr

  1. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  2. Spaceport Command and Control System Automated Testing

    Science.gov (United States)

    Stein, Meriel

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  3. TARZAN: A REMOTE TOOL DEPLOYMENT SYSTEM FOR THE WEST VALLEY DEVELOPMENT PROJECT

    International Nuclear Information System (INIS)

    Thompson, Bruce R.; Veri, James

    1999-01-01

    RedZone Robotics, Inc. undertook a development project to build Tarzan, a Remote Tool Delivery system to work inside nuclear waste storage tanks 8D-1 and 8D-2 at the West Valley Demonstration Project (WVDP). The removal of waste deposits from large storage tanks poses significant challenges during tank operations and closure. Limited access, the presence of chemical, radiological, and /or explosive hazards, and the need to deliver retrieval equipment to all regions of the tank exceed the capabilities of most conventional methods and equipment. Remotely operated devices for mobilizing and retrieving waste materials are needed. Some recent developments have been made in this area. However, none of these developments completely and cost-effectively address tanks that are congested with internal structures (e.g., support columns, cooling coils, fixed piping, etc.). The Tarzan system consists of the following parts: Locomotor which is deployed in the tank for inspection and cleanup; Hydraulic power unit providing system power for the locomotor and deployment unit; and Control system providing the man machine interface to control, coordinate and monitor the system. This document presents the final report on the Tarzan project

  4. Cockpit control system conceptual design

    Science.gov (United States)

    Meholic, Greg; Brown, Rhonda; Hall, Melissa; Harvey, Robert; Singer, Michael; Tella, Gustavo

    1993-01-01

    The purpose of this project was to provide a means for operating the ailerons, elevator, elevator trim, rudder, nosewheel steering, and brakes in the Triton primary flight trainer. The main design goals under consideration were to illustrate system and subsystem integration, control function ability, and producibility. Weight and maintenance goals were addressed.

  5. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  6. Diagnostic system for process control at NPP Dukovany load follow

    International Nuclear Information System (INIS)

    Rubek, J.; Petruzela, I.

    1998-01-01

    The NPP Dukovany is being operated in the frequency control since 1996. In last year a project for the plant load follow has been developed. One part of the project is to install a diagnostic system for process control. At present the main control loops of the plant control system are regular tested after unit refuelling only. The functionality and control system parameter adjusting is tested by certificated procedures. This state is unsuitable in view of the plan load follow operation. The relevant operational modes are based on minimisation of influence on plant component life time and on achievement of planned unit parameters. Therefore it is necessary to provide testing of main control system parts in shorter time period. Mainly at time when the unit is really in load follow operation. The paper describes the diagnostic system for process control which will be at NPP Dukovany implemented. The principal of the system will be evaluation of real and expected changes of technological variables. The system utilises thermohydraulic relation among main technological variables and relation among controlled and manipulated variables. Outputs of the system will be used to operational staff support at the plant operation. It enables: determination of control system state, estimation and check of future control system state, early indication of the deviation of process from normal conditions, check of efficiency of operational staff intervention into plant control. The system gives the plant operator new information for the plant process control. Simultaneously the coupling of new system outputs on existing signalisation is solved. (author)

  7. Architecture of WEST plasma control system

    International Nuclear Information System (INIS)

    Ravenel, N.; Nouailletas, R.; Barana, O.; Brémond, S.; Moreau, P.; Guillerminet, B.; Balme, S.; Allegretti, L.; Mannori, S.

    2014-01-01

    To operate advanced plasma scenario (long pulse with high stored energy) in present and future tokamak devices under safe operation conditions, the control requirements of the plasma control system (PCS) leads to the development of advanced feedback control and real time handling exceptions. To develop these controllers and these exceptions handling strategies, a project aiming at setting up a flight simulator has started at CEA in 2009. Now, the new WEST (W Environment in Steady-state Tokamak) project deals with modifying Tore Supra into an ITER-like divertor tokamak. This upgrade impacts a lot of systems including Tore Supra PCS and is the opportunity to improve the current PCS architecture to implement the previous works and to fulfill the needs of modern tokamak operation. This paper is dealing with the description of the architecture of WEST PCS. Firstly, the requirements will be presented including the needs of new concepts (segments configuration, alternative (or backup) scenario, …). Then, the conceptual design of the PCS will be described including the main components and their functions. The third part will be dedicated to the proposal RT framework and to the technologies that we have to implement to reach the requirements

  8. Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity

    Science.gov (United States)

    Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka

    Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.

  9. Distributed control system for CANDU 9 nuclear power plant

    International Nuclear Information System (INIS)

    Harber, J.E.; Kattan, M.K.; Macbeth, M.J.

    1996-01-01

    Canadian designed CANDU pressurized heavy water nuclear reactors have been world leaders in electrical power generation. The CANDU 9 project is AECL's next reactor design. The CANDU 9 plant monitoring, annunciation, and control functions are implemented in two evolutionary systems; the distributed control system (DCS) and the plant display system (PDS). The CDS implements most of the plant control functions in a single hardware platform. The DCS communicates with the PDS to provide the main operator interface and annunciation capabilities of the previous control computer designs along with human interface enhancements required in a modern control system. (author)

  10. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  11. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    operation is highly automated. However, the procedures for estimating demands and the policies for the inventory control system that were in use at the beginning of the project did not fully match the sophisticated technological standard of the physical system. During the initial phase of the project...... We describe the development of a framework to compute the optimal inventory policy for a large spare-parts' distribution centre operation in the RA division of the Danfoss Group in Denmark. The RA division distributes spare parts worldwide for cooling and A/C systems. The warehouse logistics...

  12. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  13. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  14. Closed-Loop Tension Control System for Injection Moulding Machine

    African Journals Online (AJOL)

    When the mould unit is full, this drive keeps transporting filament materials without proper control. This project developed a closed loop feedback tension control system and it is to replace servo motor drive system for the transportation of filament and it demonstrated a new technological advancement and the theory of ...

  15. Replacement of the ISIS control system

    International Nuclear Information System (INIS)

    Mannix, R.P.; Barton, C.J.; Brownless, D.M.; Kerr, J.C.

    1992-01-01

    In operation since 1985, ISIS is the world's most powerful pulsed spallation neutron source. The decision has been taken to replace the existing ISIS control system, which has been in use for over ten years. The problems of such a project, given the legacy of processor specific hardware and software are discussed, a long with the problems associated with incorporating existing interface hardware into any new system. Present progress using commercial workstation based control software is presented with, an assessment of the benefits and pitfalls of such an approach. (author)

  16. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  17. Time Optimal Control Laws for Bilinear Systems

    Directory of Open Access Journals (Sweden)

    Salim Bichiou

    2018-01-01

    Full Text Available The aim of this paper is to determine the feedforward and state feedback suboptimal time control for a subset of bilinear systems, namely, the control sequence and reaching time. This paper proposes a method that uses Block pulse functions as an orthogonal base. The bilinear system is projected along that base. The mathematical integration is transformed into a product of matrices. An algebraic system of equations is obtained. This system together with specified constraints is treated as an optimization problem. The parameters to determine are the final time, the control sequence, and the states trajectories. The obtained results via the newly proposed method are compared to known analytical solutions.

  18. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  19. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  20. LEDA LLRF control system characterization

    International Nuclear Information System (INIS)

    Regan, A.H.; Balleyguier, P.; Ziomek, C.D.

    1998-01-01

    The Low Energy Demonstration Accelerator (LEDA) for the Accelerator for the Production of Tritium (APT) project will be built at Los Alamos National Laboratory. The low-level RF (LLRF) control system portion of this accelerator must perform many functions, of which the primary one is controlling the RF fields in the accelerating cavities. Plans have been made to provide for on-line characterization of the LLRF control system and the complete RF system through use of stimulus and response buffers, and a digital signal processor built into the field control system electronics. The purpose of this circuitry is to characterize the behavior of the entire RF system (klystron, waveguides, high power splitters, accelerator cavity, etc.). This characterization feature can be used to measure the performance of the closed loop system with respect to the open loop system, to provide an automated way to set loop parameters, to determine the cavity Q-curve, and to detect any abnormal behavior in the RF chain. The types of measurements include frequency and time-domain responses to given perturbations, amplitude modulations, etc. This paper will discuss types of algorithms that can be implemented and present a description and block diagram of the electronics to be used

  1. The new Aladdin control system

    International Nuclear Information System (INIS)

    Stott, J.P.; Eisert, D.E.

    1990-01-01

    The preliminary design of the new control system for the Aladdin electron-storage-ring light source was described at the Los Alamos workshop and an updated report was given at the Villars conference. The new system is now almost completely installed and this paper is a final report on the project. The major features of the system are the following: commercial hardware is used throughout the computer, network and microcomputer systems; the operator consoles and the device-control microcomputers are linked by Ethernet; VAXstations with keyboard and track-ball input devices are used in the operator consoles; the microcomputers use 68000-based single-board computers and VMEbus backplanes; the main magnet power supplies contain intelligent controllers which are linked to a microcomputer by a multidrop serial link; the microcomputer software is developed on the VAXstations; it is downloaded into RAM and debugged over the Ethernet before being burned into EPROMs for operational use. This paper describes the design of the system, highlighting changes from the previous proposals, and discusses the aspects which allowed the control system of an operating facility to be rebuilt without requiring or causing any significant downtime. The performance of the new system and possible future improvements are also discussed. (orig.)

  2. Accountability control system in plutonium fuel facility

    International Nuclear Information System (INIS)

    Naruki, Kaoru; Aoki, Minoru; Mizuno, Ohichi; Mishima, Tsuyoshi

    1979-01-01

    More than 30 tons of plutonium-uranium mixed-oxide fuel have been manufactured at the Plutonium Facility in PNC for JOYO, FUGEN and DCA (Deuterium Critical Assembly) and for the purpose of irradiation tests. This report reviews the nuclear material accountability control system adopted in the Plutonium Facility. Initially, the main objective of the system was the criticality control of fissible materials at various stages of fuel manufacturing. The first part of this report describes the functions and the structure of the control system. A flow chart is provided to show the various stages of material flow and their associated computer files. The system is composed of the following three sub-systems: procedures of nuclear material transfer; PIT (Physical Inventory Taking); data retrieval, report preparation and file maintenance. OMR (Optical Mark Reader) sheets are used to record the nuclear material transfer. The MUF (Materials Unaccounted For) are evaluated by PIT every three months through computer processing based on the OMR sheets. The MUF ratio of Pu handled in the facility every year from 1966 to 1977 are presented by a curve, indicating that the MUF ratio was kept well under 0.5% for every project (JOYO, FUGEN, and DCA). As for the Pu safeguards, the MBA (Material Balance Area) and the KMP (Key Measurement Point) in the facility of PNC are illustrated. The general idea of the projected PINC (Plutonium Inventory Control) system in PNC is also shortly explained. (Aoki, K.)

  3. General collaboration offer of Johnson Controls regarding the performance of air conditioning automatic control systems and other buildings` automatic control systems

    Energy Technology Data Exchange (ETDEWEB)

    Gniazdowski, J.

    1995-12-31

    JOHNSON CONTROLS manufactures measuring and control equipment (800 types) and is as well a {open_quotes}turn-key{close_quotes} supplier of complete automatic controls systems for heating, air conditioning, ventilation and refrigerating engineering branches. The Company also supplies Buildings` Computer-Based Supervision and Monitoring Systems that may be applied in both small and large structures. Since 1990 the company has been performing full-range trade and contracting activities on the Polish market. We have our own well-trained technical staff and we collaborate with a series of designing and contracting enterprises that enable us to have our projects carried out all over Poland. The prices of our supplies and services correspond with the level of the Polish market.

  4. Advanced Grid Control Technologies Workshop Series | Energy Systems

    Science.gov (United States)

    : Smart Grid and Beyond John McDonald, Director, Technical Strategy and Policy Development, General Control Technologies Workshop Series In July 2015, NREL's energy systems integration team hosted workshops the Energy Systems Integration Facility (ESIF) and included a technology showcase featuring projects

  5. Framework for virtual control desk projects

    Energy Technology Data Exchange (ETDEWEB)

    Mol, Antonio Carlos A.; Freitas, Victor Goncalves G.; Espieito Santos, Andre Cotelli do; Aghina, Mauricio A. da C. e, E-mail: mol@ien.gov.b, E-mail: vgoncalves@ien.gov.b, E-mail: mag@ien.gov.b [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2011-07-01

    Through the recent advances of the Brazilian nuclear program, the creation of virtual control desks allows an ergonomic evaluation and technique of the same, even before its physical implementation, reducing costs and time in addition to allow the virtual training of operators. This project intends to develop a 'framework' where the components of a real control desk are available for creating a virtual desk, continuing the project control desk developed at the Laboratorio de Interface Homem Sistema do IEN (LABHIS/IEN). Through the C++ programming language integrated with the OPENGL graphics library was possible to create the desk and it's components, allowing a graphical modeling in 3D (stereo) of a virtual control desk where the operator, with the aid of GLUI user interface library, can choose what and where the components are positioned on the bench, and select the type of desk wanted from the pre-defined templates. Finally, with the control desk mounted and configured, enabling a virtual interaction with operators, making possible to reproduce its functionalities. (author)

  6. Framework for virtual control desk projects

    International Nuclear Information System (INIS)

    Mol, Antonio Carlos A.; Freitas, Victor Goncalves G.; Espieito Santos, Andre Cotelli do; Aghina, Mauricio A. da C. e

    2011-01-01

    Through the recent advances of the Brazilian nuclear program, the creation of virtual control desks allows an ergonomic evaluation and technique of the same, even before its physical implementation, reducing costs and time in addition to allow the virtual training of operators. This project intends to develop a 'framework' where the components of a real control desk are available for creating a virtual desk, continuing the project control desk developed at the Laboratorio de Interface Homem Sistema do IEN (LABHIS/IEN). Through the C++ programming language integrated with the OPENGL graphics library was possible to create the desk and it's components, allowing a graphical modeling in 3D (stereo) of a virtual control desk where the operator, with the aid of GLUI user interface library, can choose what and where the components are positioned on the bench, and select the type of desk wanted from the pre-defined templates. Finally, with the control desk mounted and configured, enabling a virtual interaction with operators, making possible to reproduce its functionalities. (author)

  7. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  8. India: Project Control. Annex 7

    International Nuclear Information System (INIS)

    Raghavan, V.

    1999-01-01

    This annex deals with project control. India is a country with a long history of nuclear power development, mostly based on indigenous technology and resources. The nuclear power programme has suffered considerable delays due to technical and financial. (author)

  9. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  10. Software quality assurance plan for the National Ignition Facility integrated computer control system

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project`s controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy`s (DOE`s) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project.

  11. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  12. Control of distributed systems : tutorial and overview

    Czech Academy of Sciences Publication Activity Database

    van Schuppen, J. H.; Boutin, O.; Kempker, P.L.; Komenda, Jan; Masopust, Tomáš; Pambakian, N.; Ran, A.C.M.

    2011-01-01

    Roč. 17, 5-6 (2011), s. 579-602 ISSN 0947-3580 R&D Projects: GA ČR(CZ) GAP103/11/0517; GA ČR(CZ) GPP202/11/P028 Institutional research plan: CEZ:AV0Z10190503 Keywords : distributed system * coordination control * hierarchical control * distributed control * distributed control with communication Subject RIV: BA - General Mathematics Impact factor: 0.817, year: 2011 http://ejc.revuesonline.com/article.jsp?articleId=16873

  13. Integrated Design Tools for Embedded Control Systems

    OpenAIRE

    Jovanovic, D.S.; Hilderink, G.H.; Broenink, Johannes F.; Karelse, F.

    2001-01-01

    Currently, computer-based control systems are still being implemented using the same techniques as 10 years ago. The purpose of this project is the development of a design framework, consisting of tools and libraries, which allows the designer to build high reliable heterogeneous real-time embedded systems in a very short time at a fraction of the present day costs. The ultimate focus of current research is on transformation control laws to efficient concurrent algorithms, with concerns about...

  14. 242-A Control System device logic software documentation. Revision 2

    International Nuclear Information System (INIS)

    Berger, J.F.

    1995-01-01

    A Distributive Process Control system was purchased by Project B-534. This computer-based control system, called the Monitor and Control System (MCS), was installed in the 242-A Evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and Monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment System Engineering Group of Westinghouse. This document describes the Device Logic for this system

  15. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  16. Valuation of Construction Projects Based on of Quantity Scale by using Expert System

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-02-01

    Full Text Available The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation. The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

  17. Technical Requirements Analysis and Control Systems (TRACS) Initial Operating Capability (IOC) documentation

    Science.gov (United States)

    Hammond, Dana P.

    1991-01-01

    The Technical Requirements Analysis and Control Systems (TRACS) software package is described. TRACS offers supplemental tools for the analysis, control, and interchange of project requirements. This package provides the fundamental capability to analyze and control requirements, serves a focal point for project requirements, and integrates a system that supports efficient and consistent operations. TRACS uses relational data base technology (ORACLE) in a stand alone or in a distributed environment that can be used to coordinate the activities required to support a project through its entire life cycle. TRACS uses a set of keyword and mouse driven screens (HyperCard) which imposes adherence through a controlled user interface. The user interface provides an interactive capability to interrogate the data base and to display or print project requirement information. TRACS has a limited report capability, but can be extended with PostScript conventions.

  18. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  19. 42 CFR 489.34 - Allowable charges: Hospitals participating in State reimbursement control systems or...

    Science.gov (United States)

    2010-10-01

    ... reimbursement control systems or demonstration projects. 489.34 Section 489.34 Public Health CENTERS FOR... CERTIFICATION PROVIDER AGREEMENTS AND SUPPLIER APPROVAL Allowable Charges § 489.34 Allowable charges: Hospitals participating in State reimbursement control systems or demonstration projects. A hospital receiving payment for...

  20. Simulation of traffic control signal systems

    Science.gov (United States)

    Connolly, P. J.; Concannon, P. A.; Ricci, R. C.

    1974-01-01

    In recent years there has been considerable interest in the development and testing of control strategies for networks of urban traffic signal systems by simulation. Simulation is an inexpensive and timely method for evaluating the effect of these traffic control strategies since traffic phenomena are too complex to be defined by analytical models and since a controlled experiment may be hazardous, expensive, and slow in producing meaningful results. This paper describes the application of an urban traffic corridor program, to evaluate the effectiveness of different traffic control strategies for the Massachusetts Avenue TOPICS Project.

  1. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  2. Man-machine systems research at the OECD Halden reactor project

    International Nuclear Information System (INIS)

    Owre, F.; Bjorlo, T.J.; Haugset, K.

    1994-01-01

    The OECD Halden Reactor Project is a jointly financed research programme under the auspices of the OECD - Nuclear Energy Agency with fifteen participating countries. One of the main research topics focuses on man-machine systems. Particular attention is paid to the operator's tasks in the reactor control room environment. The overall objective of the research in this field is to provide a basis for improving today's control rooms through the introduction of computer-based solutions for the effective and safe execution of surveillance and control functions in normal as well as off-normal plant situations. The programme comprises four main activities: the verification and validation of safety critical software systems; man-machine interaction research emphasizing improvements in man-machine interfaces on the basis of human factors studies; computerised operator support systems assisting the operator in fault detection/diagnosis and planning of control actions; and control room development providing a basis for retrofitting of existing control rooms and for the design of advanced concepts

  3. NASA's OCA Mirroring System: An Application of Multiagent Systems in Mission Control

    Science.gov (United States)

    Sierhuis, Maarten; Clancey, William J.; vanHoof, Ron J. J.; Seah, Chin H.; Scott, Michael S.; Nado, Robert A.; Blumenberg, Susan F.; Shafto, Michael G.; Anderson, Brian L.; Bruins, Anthony C.; hide

    2009-01-01

    Orbital Communications Adaptor (OCA) Flight Controllers, in NASA's International Space Station Mission Control Center, use different computer systems to uplink, downlink, mirror, archive, and deliver files to and from the International Space Station (ISS) in real time. The OCA Mirroring System (OCAMS) is a multiagent software system (MAS) that is operational in NASA's Mission Control Center. This paper presents OCAMS and its workings in an operational setting where flight controllers rely on the system 24x7. We also discuss the return on investment, based on a simulation baseline, six months of 24x7 operations at NASA Johnson Space Center in Houston, Texas, and a projection of future capabilities. This paper ends with a discussion of the value of MAS and future planned functionality and capabilities.

  4. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  5. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  6. The Space Technology-7 Disturbance Reduction System Precision Control Flight Validation Experiment Control System Design

    Science.gov (United States)

    O'Donnell, James R.; Hsu, Oscar C.; Maghami, Peirman G.; Markley, F. Landis

    2006-01-01

    As originally proposed, the Space Technology-7 Disturbance Reduction System (DRS) project, managed out of the Jet Propulsion Laboratory, was designed to validate technologies required for future missions such as the Laser Interferometer Space Antenna (LISA). The two technologies to be demonstrated by DRS were Gravitational Reference Sensors (GRSs) and Colloidal MicroNewton Thrusters (CMNTs). Control algorithms being designed by the Dynamic Control System (DCS) team at the Goddard Space Flight Center would control the spacecraft so that it flew about a freely-floating GRS test mass, keeping it centered within its housing. For programmatic reasons, the GRSs were descoped from DRS. The primary goals of the new mission are to validate the performance of the CMNTs and to demonstrate precise spacecraft position control. DRS will fly as a part of the European Space Agency (ESA) LISA Pathfinder (LPF) spacecraft along with a similar ESA experiment, the LISA Technology Package (LTP). With no GRS, the DCS attitude and drag-free control systems make use of the sensor being developed by ESA as a part of the LTP. The control system is designed to maintain the spacecraft s position with respect to the test mass, to within 10 nm/the square root of Hz over the DRS science frequency band of 1 to 30 mHz.

  7. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  8. Achievements and challenges of the World Bank Loan/Department for International Development grant-assisted Tuberculosis Control Project in China.

    Science.gov (United States)

    Kong, Peng; Jiang, Xu; Zhang, Ben; Jiang, Shi-wen; Liu, Bo

    2011-07-01

    In March 2002, the government of China launched the World Bank Loan/ Department for International Development-supported Tuberculosis (TB) Control Project to reduce the prevalence and mortality of TB. The project generated promising results in policy development, strengthening of TB control systems, patient treatment success, funds management, and the introduction of legislation. In light of the global TB epidemic and control environment, it is useful to review the TB control priorities of the project, summarize the achievements and experiences around its implementation.

  9. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  10. Control Architecture for Future Power Systems

    DEFF Research Database (Denmark)

    Heussen, Kai

    for assessment of control architecture of electric power systems with a means-ends perspective. Given this purpose-oriented understanding of a power system, the increasingly stochastic nature of this problem shall be addressed and approaches for robust, distributed control will be proposed and analyzed....... The introduction of close-to-real-time markets is envisioned to enable fast distributed resource allocation while guaranteeing system stability. Electric vehicles will be studied as a means of distributed reversible energy storage and a flexible power electronic interface, with application to the case......This project looks at control of future electric power grids with a high proportion of wind power and a large number of decentralized power generation, consumption and storage units participating to form a reliable supply of electrical energy. The first objective is developing a method...

  11. MPC and A operational monitoring system pilot project at MEPhI as example of successful application in the international/national control and guaranties programs

    International Nuclear Information System (INIS)

    Ryzhukhin, D.V.; Bondarev, P.V.; Pogozhin, N.S.

    2002-01-01

    Full text: At present an active development of digital communication technologies has resulted in reduction of their cost and increase of their possibilities. As a result the remote monitoring systems gain new development. The increase of the requirements to a safety level on potentially dangerous and very important objects makes such systems extremely attractive for using in a system of national departmental or international control and inspections. Purpose of using such systems is to provide control for correctness of subject to the control-regulated procedures performance, performance of management or inspection bodies' instructions and operating of existing protection systems, at integration with them. This control is independent from object staff. The remote monitoring systems usage by supervising bodies at an object gives following advantages: timely reception of information; increase of information volume at the expense of constant non physically presence of an onsite inspector; increase of received information objectivity at the expense of the fact of 'undeclared inspections' realization; an opportunity of application modern information technologies for analysis and storage of digital information; reduction of impact on object's work; reduction of volume of physical inspections and expenses for their realization. All above was reflected in the material protect, control and accounting (MPC and A) operational monitoring (MOM) program, begun under Russian-American cooperation in the field of MPC and A in 2001. MOM program purpose is to control double application materials and radioactive divided materials, activity of the people under MPC and A program and procedures ensuring performance of guarantees on special nuclear material (SNM) protection and non-proliferation. The Moscow engineering-physics institute (state university) (MEPhl) was chosen as an object of realization of MOM system pilot project. The reasons are that MEPhl is installed under framework of

  12. Update on the TRIUMF Central Control System

    International Nuclear Information System (INIS)

    Mouat, M.M.; Diel, D.A.; Grant, P.A.; Klassen, E.; Lee, K.S.; Ludgate, G.A.; Richards, J.E.; Yogendran, P.J.; Kadantsev, S.G.

    1994-01-01

    The continuing evolution of the TRIUMF Central Control System is currently subject to three major influences. Most imperative is the need to replace the obsolete Nova computers that still handle much of the routine cyclotron operation. Smooth integration of a number of isolated control systems into the CCS is another focus. The third major force arises from the requirements of developing new projects in a system that has reached serious expansion constraints. The plan for phasing out the Novas, integrating the orphaned systems and allowing expansion of the CCS in a smooth fashion is discussed. This is a conservative approach, relying on the strengths of the present hardware configuration, the substantial financial investment in existing equipment, and the expertise of available personnel, while meeting the present and future requirements. Details of the modified and expanded hardware configuration are described. This review also briefly mentions new support for device access, X-window displays, database usage, and plans for one of the upcoming projects, namely an eye cancer proton therapy treatment facility. ((orig.))

  13. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  14. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  15. Adaptive function project synchronization of Roessler hyperchaotic system with uncertain parameters

    International Nuclear Information System (INIS)

    Luo Runzi

    2008-01-01

    This Letter addresses the function project synchronization problem of two Roessler hyperchaotic in the presence of unknown system parameters. Based on Lyapunov stability theory an adaptive control law is proposed to make the states of two identical Roessler hyperchaotic systems asymptotically synchronized. Numerical simulations are presented to show the effectiveness of the proposed schemes

  16. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  17. Adaptive generalized function projective lag synchronization of different chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wu Xiangjun; Lu Hongtao

    2011-01-01

    Highlights: → Adaptive generalized function projective lag synchronization (AGFPLS) is proposed. → Two uncertain chaos systems are lag synchronized up to a scaling function matrix. → The synchronization speed is sensitively influenced by the control gains. → The AGFPLS scheme is robust against noise perturbation. - Abstract: In this paper, a novel projective synchronization scheme called adaptive generalized function projective lag synchronization (AGFPLS) is proposed. In the AGFPLS method, the states of two different chaotic systems with fully uncertain parameters are asymptotically lag synchronized up to a desired scaling function matrix. By means of the Lyapunov stability theory, an adaptive controller with corresponding parameter update rule is designed for achieving AGFPLS between two diverse chaotic systems and estimating the unknown parameters. This technique is employed to realize AGFPLS between uncertain Lue chaotic system and uncertain Liu chaotic system, and between Chen hyperchaotic system and Lorenz hyperchaotic system with fully uncertain parameters, respectively. Furthermore, AGFPLS between two different uncertain chaotic systems can still be achieved effectively with the existence of noise perturbation. The corresponding numerical simulations are performed to demonstrate the validity and robustness of the presented synchronization method.

  18. Control of Flywheel Energy Storage Systems in Electrical Vehicle Charging Stations

    DEFF Research Database (Denmark)

    Sun, Bo

    energy storage system (FESS). The proposed PhD project supports a corresponding smart control strategy that could be termed “charging station to grid (CS2G)”. It explores the possibility of using a dedicated energy storage system (FESS) within the charging station to alleviate grid and market conditions...... converters is built and analyzed. |Based on modeling analysis, centralized and distributed control methods are both explored to realize the coordination control of each components in the system. Specially, this project proposes a “dc voltage vs speed” droop strategy for FESS control based on distributed bus...... function method when the system switches its operation behavior between two modes. Finally, a downscaled FCS prototype with FESS is built in the intelligent MG lab, and experiments and hardware-in-loop simulation results are conducted to verify the effectiveness and feasibility with the proposed FCS...

  19. Integrated management tool for controls software problems, requests and project tasking at SLAC

    International Nuclear Information System (INIS)

    Rogind, D.; Allen, W.; Colocho, W.; DeContreras, G.; Gordon, J.; Pandey, P.; Shoaee, H.

    2012-01-01

    The Accelerator Directorate (AD) Instrumentation and Controls (ICD) Software (SW) Department at SLAC, with its service center model, continuously receives engineering requests to design, build and support controls for accelerator systems lab-wide. Each customer request can vary in complexity from a small software engineering change to a major enhancement. SLAC's Accelerator Improvement Projects (AIPs), along with DOE Construction projects, also contribute heavily to the work load. The various customer requests and projects, paired with the ongoing operational maintenance and problem reports, place a demand on the department that consistently exceeds the capacity of available resources. A centralized repository - comprised of all requests, project tasks, and problems - available to physicists, operators, managers, and engineers alike, is essential to capture, communicate, prioritize, assign, schedule, track, and finally, commission all work components. The Software Department has recently integrated request / project tasking into SLAC's custom online problem tracking 'Comprehensive Accelerator Tool for Enhancing Reliability' (CATER) tool. This paper discusses the newly implemented software request management tool - the workload it helps to track, its structure, features, reports, work-flow and its many usages. (authors)

  20. System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System

    International Nuclear Information System (INIS)

    ANGLESEY, M.O.

    2000-01-01

    The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items

  1. The Control Room Upgrade in Oskarshamn 2 Modernization Project Lesson Learned from Ongoing Human Factor design

    International Nuclear Information System (INIS)

    Thomas, Gunnarsson; Magnus, Eliasson

    2011-01-01

    Due to recent changes in Swedish commercial nuclear safety system requirements, OKG decided to make the changes required by the new safety requirements, apply for a 30-year license extension, and to concurrently make changes for a major power uprate; this project is called the Plant Life Extension project (PLEX). It was decided, in addition to several plant modifications, to re build the old control room to a new modern screen-based control room located in the same space as the old one, and with the same number of operators. This paper explains the approach taken when modernizing the control room as a part of the Oskarshamn 2 Modernization project PLEX, the results, and the lessons learned from this ongoing work. The combination of changes results in a modernization project that is expected to increase output power by approximately 50 MWe through increased efficiency and to result in an increase in thermal power from 1800 MWt to 2300 MWt (28%) and electrical power from 620 MWe to 840 MWe due to the power uprate. The license to operate OKG2 expires in 2012 The PLEX project is one of the most ambitious nuclear power plant modernization projects ever implemented, world-wide. The application of human factors engineering (HFE) and control room and HSI design is a complex challenge. The original main control room from 1975 in Oskarshamn 2, was quite compact and provided a fairly good overview of the process. New requirements for enhanced safety and other design changes in the process systems and instrumentation led to a step-wise installation of new information and control equipment in the control room. Since the control room was quite limited in space, the control room grew larger, and the new equipment was installed farther away from the operator workplaces into an adjacent control room. This was even the case for the new safety systems. These systems were functioning well separately as such, but in some cases their interfaces were inconsistent, leading to increased

  2. Title IV Quality Control Project, Stage II. Management Option II: Delivery System Quality Improvements.

    Science.gov (United States)

    Advanced Technology, Inc., Reston, VA.

    Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…

  3. Overlapping quadratic optimal control of linear time-varying commutative systems

    Czech Academy of Sciences Publication Activity Database

    Bakule, Lubomír; Rodellar, J.; Rossell, J. M.

    2002-01-01

    Roč. 40, č. 5 (2002), s. 1611-1627 ISSN 0363-0129 R&D Projects: GA AV ČR IAA2075802 Institutional research plan: CEZ:AV0Z1075907 Keywords : overlapping * optimal control * linear time-varying systems Subject RIV: BC - Control Systems Theory Impact factor: 1.441, year: 2002

  4. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  5. Bulgaria: Belene NPP. Project Control. Annex 3

    International Nuclear Information System (INIS)

    Nabatov, N.

    1999-01-01

    This annex deals with project control. The Belene project has been suspended for 7 years after approx. 50% of money had been spent. Equipment, structures and documentation have been well protected, but majority of qualified personnel have been lost. Resumption of work awaits government decision and provision of funds. (author)

  6. DOOCS based control system for FPGA based cavity simulator and controller in VUV FEL

    International Nuclear Information System (INIS)

    Pucyk, P.

    2005-09-01

    The X-ray free-electron laser XFEL that is being planned at the DESY research center in cooperation with European partners will produce high-intensity ultra-short X-ray flashes with the properties of laser light. This new light source, which can only be described in terms of superlatives, will open up a whole range of new perspectives for the natural sciences. It could also offer very promising opportunities for industrial users. SIMCON (SIMulator and CONtroller) is the project of the fast, low latency digital controller dedicated for LLRF 1 system in VUV FEL experiment It is being developed by ELHEP 2 group in Institute of Electronic Systems at Warsaw University of Technology. The main purpose of the project is to create a controller for stabilizing the vector sum of fields in cavities of one cryo module in the experiment. The device can be also used as the simulator of the cavity and test bench for other devices. Ths paper describes the concept, implementation and tests of the DOOCS based control system for SIMCON. The designed system is based the concept of autonomic and extendable modules connected by well defined, unified interfaces. The communication module controls the access to the hardware. It is crucial, that all modules (this presented in thesis and developed in the future) use this interface. Direct access to the control tables let the engineers to perform algorithm development or diagnostic measurements of the LLRF system. Default control tables generator makes the whole SIMCON an autonomic device, which can start immediately the operation without any additional tools. (orig.)

  7. DOOCS based control system for FPGA based cavity simulator and controller in VUV FEL

    International Nuclear Information System (INIS)

    Pucyk, P.D.

    2006-03-01

    The X-ray free-electron laser XFEL that is being planned at the DESY research center in cooperation with European partners will produce high-intensity ultra-short X-ray flashes with the properties of laser light. This new light source, which can only be described in terms of superlatives, will open up a whole range of new perspectives for the natural sciences. It could also offer very promising opportunities for industrial users. SIMCON (SIMulator and CONtroller) is the project of the fast, low latency digital controller dedicated for LLRF 1 system in VUV FEL experiment It is being developed by ELHEP 2 group in Institute of Electronic Systems at Warsaw University of Technology. The main purpose of the project is to create a controller for stabilizing the vector sum of fields in cavities of one cryo module in the experiment. The device can be also used as the simulator of the cavity and test bench for other devices. This paper describes the concept, implementation and tests of the DOOCS based control system for SIMCON. The designed system is based the concept of autonomic and extendable modules connected by well defined, unified interfaces. The communication module controls the access to the hardware. It is crucial, that all modules (this presented in thesis and developed in the future) use this interface. Direct access to the control tables let the engineers to perform algorithm development or diagnostic measurements of the LLRF system. Default control tables generator makes the whole SIMCON an autonomic device, which can start immediately the operation without any additional tools. (Orig.)

  8. Implementation method of multi-terminal DC control system

    Science.gov (United States)

    Yi, Liu; Hao-Ran, Huang; Jun-Wen, Zhou; Hong-Guang, Guo; Yu-Yong, Zhou

    2018-04-01

    Currently the multi-terminal DC system (MTDC) has more stations. Each station needs operators to monitor and control the device. It needs much more operation and maintenance, low efficiency and small reliability; for the most important reason, multi-terminal DC system has complex control mode. If one of the stations has some problem, the control of the whole system should have problems. According to research of the characteristics of multi-terminal DC (VSC-MTDC) systems, this paper presents a strong implementation of the multi-terminal DC Supervisory Control and Data Acquisition (SCADA) system. This system is intelligent, can be networking, integration and intelligent. A master control system is added in each station to communication with the other stations to send current and DC voltage value to pole control system for each station. Based on the practical application and information feedback in the China South Power Grid research center VSC-MTDC project, this system is higher efficiency and save the cost on the maintenance of convertor station to improve the intelligent level and comprehensive effect. And because of the master control system, a multi-terminal system hierarchy coordination control strategy is formed, this make the control and protection system more efficiency and reliability.

  9. Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

    Directory of Open Access Journals (Sweden)

    Bhzad Sidawi

    2012-01-01

    Full Text Available Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over management. This is due to a number of reasons such as lack of human resources and infrastructure. Research studies that were undertaken worldwide - regarding this issue- has highlighted few unique management problems. The aim of this paper is to investigate how far the IT tools would help in managing remote construction projects in the Kingdom of Saudi Arabia (KSA. Due to the lack of previous research regarding remote projects within the Gulf region and the KSA, a pilot study was conducted in 2009 to define and test the wording of questions that are part of the main survey. The main survey was undertaken on Saudi Electric Company (SEC. The study found that IT systems and tools have the potential but this potential is hindered by a number of technical, managerial, staff factors. Therefore, successful application of IT systems would require changes to the present management settings at various levels. This would ensure that the SEC is capable of achieving the full benefit from using these advanced systems.

  10. Evaluating Tobacco Control Policies in 28 Countries (including 9 EU countries: The ITC Project

    Directory of Open Access Journals (Sweden)

    Geoffrey Fong

    2016-03-01

    Full Text Available Since its start in 2002, the ITC Project has been conducting evaluation studies of tobacco control policies via prospective cohort surveys of tobacco users in 28 countries, including 9 EU countries. This presentation will focus on the design of the ITC Project and how it differs from and complements existing evidence-gathering systems (monitoring and surveillance systems in measuring and understanding the impact of FCTC policies. The presentation will also describe the ITC Project's most recent initiatives: (1 the EUREST-PLUS study focusing on measuring the impact of the Tobacco Products Directive, and (2 a large-scale international cohort study of e-cigarettes starting in the United States, Canada, England, and Australia.

  11. The Study on quality control of nuclear power installation project

    International Nuclear Information System (INIS)

    Wu Jie

    2008-01-01

    The quality planning, quality assurance and quality control are discussed by applying the quality control (QC) theory and combining the real situation of the Qinshan II project. This paper is practical and plays an active role in instruction of project quality control by applying the above QC theory and control techniques. (authors)

  12. Functions and requirements document, WESF decoupling project, low-level liquid waste system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, J.H., Fluor Daniel Hanford

    1997-02-27

    The Waste Encapsulation and Storage Facility (WESF) was constructed in 1974 to encapsulate and store cesium and strontium which were isolated at B Plant from underground storage tank waste. The WESF, Building 225-B, is attached physically to the west end of B Plant, Building 221-B, 200 East area. The WESF currently utilizes B Plant facilities for disposing liquid and solid waste streams. With the deactivation of B Plant, the WESF Decoupling Project will provide replacement systems allowing WESF to continue operations independently from B Plant. Four major systems have been identified to be replaced by the WESF Decoupling Project, including the following: Low Level Liquid Waste System, Solid Waste Handling System, Liquid Effluent Control System, and Deionized Water System.

  13. The bulbospinal network controlling the phrenic motor system: Laterality and course of descending projections.

    Science.gov (United States)

    Ghali, Michael George Zaki

    2017-08-01

    The respiratory rhythm is generated by the parafacial respiratory group, Bötzinger complex, and pre-Bötzinger complex and relayed to pre-motor neurons, which in turn project to and control respiratory motor outputs in the brainstem and spinal cord. The phrenic nucleus is one such target, containing phrenic motoneurons (PhMNs), which supply the diaphragm, the primary inspiratory muscle in mammals. While some investigators have demonstrated both ipsi- and contralateral bulbophrenic projections, there exists controversy regarding the relative physiological contribution of each to phasic and tonic drive to PhMNs and at which levels decussations occur. Following C1- or C2 spinal cord hemisection-induced silencing of the ipsilateral phrenic/diaphragm activity, respiratory stressor-induced, as well as spontaneous, recovery of crossed phrenic activity is observed, suggesting an important contribution of pathways crossing below the level of injury in driving phrenic motor output. The precise mechanisms underlying this recovery are debated. In this review, we seek to present a comprehensive discussion of the organization of the bulbospinal network controlling PhMNs, a thorough appreciation of which is necessary for understanding neural respiratory control, accurate interpretation of studies investigating respiratory recovery following spinal cord injury, and targeted development of therapies for respiratory neurorehabilitation in patients sustaining high cervical cord injury. Copyright © 2017 Elsevier Ireland Ltd and Japan Neuroscience Society. All rights reserved.

  14. Quality assurance as a system of management control in nuclear power plants

    International Nuclear Information System (INIS)

    Raisic, N.

    1986-04-01

    Quality assurance is considered as a management control system which the owner of a nuclear power plant has to establish for a nuclear power project for ensuring that a plant is built as designed and that defects are corrected. The building up of such a system should start early enough in project activities and before the plant design and construction, in order to ensure correct performance of all activities related to selection of the site for the nuclear power plant, bid specification and evaluation and procurement of services. The QA is a regulatory requirement, but the prudent plant management would create such a system as part of their total project management systems irrespective of formulation of requirement. In fact regulatory requirement should be considered as the criteria to be used by the regulatory organization for evaluation of licensee's QA system and not as an objective to be reached. In this paper the needs for QA system are justified as part of the development of industrial infrastructure for the nuclear power project. Elements of the system are described such as documented QA programme and organizational structures with defined responsibility and functions of individual organizational units, and with control of information flow across the interfaces. The goals and objectives or the project organizations related to achievement and verification of quality are defined as well as system functions in attaining these objectives. This includes the feedback of information to the management on monitoring of performance in project activities, identifying deficiencies and initiating corrective actions. Domestic participation in the nuclear power plant construction will depend on the ability of local construction and manufacturing organizations to achieve high quality standards of products and services that can affect safety and performance of the nuclear power plant. Introduction of QA systems in project organizations, development of QA programme and

  15. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  16. Modified Projective Synchronization between Different Fractional-Order Systems Based on Open-Plus-Closed-Loop Control and Its Application in Image Encryption

    Directory of Open Access Journals (Sweden)

    Hongjuan Liu

    2014-01-01

    Full Text Available A new general and systematic coupling scheme is developed to achieve the modified projective synchronization (MPS of different fractional-order systems under parameter mismatch via the Open-Plus-Closed-Loop (OPCL control. Based on the stability theorem of linear fractional-order systems, some sufficient conditions for MPS are proposed. Two groups of numerical simulations on the incommensurate fraction-order system and commensurate fraction-order system are presented to justify the theoretical analysis. Due to the unpredictability of the scale factors and the use of fractional-order systems, the chaotic data from the MPS is selected to encrypt a plain image to obtain higher security. Simulation results show that our method is efficient with a large key space, high sensitivity to encryption keys, resistance to attack of differential attacks, and statistical analysis.

  17. Disturbance observer-based adaptive sliding mode hybrid projective synchronisation of identical fractional-order financial systems

    Science.gov (United States)

    Khan, Ayub; Tyagi, Arti

    2018-05-01

    In this paper, we have studied the hybrid projective synchronisation for incommensurate, integer and commensurate fractional-order financial systems with unknown disturbance. To tackle the problem of unknown bounded disturbance, fractional-order disturbance observer is designed to approximate the unknown disturbance. Further, we have introduced simple sliding mode surface and designed adaptive sliding mode controllers incorporating with the designed fractional-order disturbance observer to achieve a bounded hybrid projective synchronisation between two identical fractional-order financial model with different initial conditions. It is shown that the slave system with disturbance can be synchronised with the projection of the master system generated through state transformation. Simulation results are presented to ensure the validity and effectiveness of the proposed sliding mode control scheme in the presence of external bounded unknown disturbance. Also, synchronisation error for commensurate, integer and incommensurate fractional-order financial systems is studied in numerical simulation.

  18. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  19. Secure Control Systems for the Energy Sector

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Lab., Inc., Alpharetta, GA (United States); Stewart, John [Tennessee Valley Authority, Knoxville, TN (United States); Chavez, Adrian [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-22

    The Padlock Project is an alliance between Tennessee Valley Authority (TVA), Sandia National Laboratories (SNL), and Schweitzer Engineering Laboratories Inc. (SEL). SEL is the prime contractor on the Padlock project. Rhett Smith (SEL) is the project director and Adrian Chaves (SNL) and John Stewart (TVA) are principle investigators. SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. The Tennessee Valley Authority, a corporation owned by the U.S. government, provides electricity for 9 million people in parts of seven southeastern states at prices below the national average. TVA, which receives no taxpayer money and makes no profits, also provides flood control, navigation and land management for the Tennessee River system and assists utilities, and state and local governments with economic development.

  20. IMPULSE CONTROL HYBRID ELECTRICAL SYSTEM

    Directory of Open Access Journals (Sweden)

    A. A. Lobaty

    2016-01-01

    Full Text Available This paper extends the recently introduced approach for modeling and solving the optimal control problem of fixedswitched mode DC-DC power converter. DCDC converters are a class of electric power circuits that used extensively in regulated DC power supplies, DC motor drives of different types, in Photovoltaic Station energy conversion and other applications due to its advantageous features in terms of size, weight and reliable performance. The main problem in controlling this type converters is in their hybrid nature as the switched circuit topology entails different modes of operation, each of it with its own associated linear continuous-time dynamics.This paper analyses the modeling and controller synthesis of the fixed-frequency buck DC-DC converter, in which the transistor switch is operated by a pulse sequence with constant frequency. In this case the regulation of the DC component of the output voltage is via the duty cycle. The optimization of the control system is based on the formation of the control signal at the output.It is proposed to solve the problem of optimal control of a hybrid system based on the formation of the control signal at the output of the controller, which minimizes a given functional integral quality, which is regarded as a linear quadratic Letov-Kalman functional. Search method of optimal control depends on the type of mathematical model of control object. In this case, we consider a linear deterministic model of the control system, which is common for the majority of hybrid electrical systems. For this formulation of the optimal control problem of search is a problem of analytical design of optimal controller, which has the analytical solution.As an example of the hybrid system is considered a step-down switching DC-DC converter, which is widely used in various electrical systems: as an uninterruptible power supply, battery charger for electric vehicles, the inverter in solar photovoltaic power plants.. A

  1. Time Stamp Synchronization of PEFP Distributed Control Systems

    International Nuclear Information System (INIS)

    Song, Young Gi; An, Eun Mi; Kwon, Hyeok Jung; Cho, Yong Sub

    2010-01-01

    Proton Engineering Frontier Project (PEFP) proton linac consists of several types of control systems, such as soft Input Output Controllers (IOC) and embedded IOC based on Experimental Physics Industrial Control System (EPICS) for each subsection of PEFP facility. One of the important factors is that IOC's time clock is synchronized. The synchronized time and time stamp can be achieved with Network Time Protocol (NTP) and EPICS time stamp record without timing hardware. The requirement of the time accuracy of IOCs is less than 1 second. The main objective of this study is to configure a master clock and produce Process Variable (PV) time stamps using local CPU time synchronized from the master clock. The distributed control systems are attached on PEFP control network

  2. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  3. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  4. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  5. Sequence Control System of 1-MW CW Klystron for the PEFP

    CERN Document Server

    Park, Byoung R; Chun Myung Hwan; Han Yeung Jin; Hyo Jeong Maeng; Kim Sung Chul; Yang Jae Seok; Yu In Ha

    2005-01-01

    Sequence control system of 1-MW CW klystron for the PEFP (Proton Engineering Frontier Project) has been developed in order to drive the 1-MW klystron amplifier. The system is able to control several power supplies and many environment conditions. The hardware of sequence control and the interlock system are based on the Allen-Bradley's SLC500 Program Logic Controller (PLC). Also the system can be controlled by a touch screen at local mode or Ethernet network with high level HMI at remote mode.

  6. Shape synchronization control for three-dimensional chaotic systems

    International Nuclear Information System (INIS)

    Huang, Yuanyuan; Wang, Yinhe; Chen, Haoguang; Zhang, Siying

    2016-01-01

    This paper aims to the three-dimensional continuous chaotic system and shape of the chaotic attractor by utilizing the basic theory of plane curves in classical differential geometry, the continuous controller is synthesized for the master–slave synchronization in shape. This means that the slave system can possess the same shape of state trajectory with the master system via the continuous controller. The continuous controller is composed of three sub-controllers, which respectively correspond to the master–slave synchronization in shape for the three projective curves of the chaotic attractor onto the three coordinate planes. Moreover, the proposed shape synchronization technique as well as application of control scheme to secure communication is also demonstrated in this paper, where numerical simulation results show the proposed control method works well.

  7. Model for impact assessment in human factors engineering project of PWR plants with digital control

    International Nuclear Information System (INIS)

    Roedel, Frederico G.; Schirru, Roberto

    2017-01-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  8. Model for impact assessment in human factors engineering project of PWR plants with digital control

    Energy Technology Data Exchange (ETDEWEB)

    Roedel, Frederico G.; Schirru, Roberto, E-mail: froedel@nuclear.ufrj.br, E-mail: schirru@lmp.ufrj.br [Coordenacao de Pos-Graduacao e Pesquisa de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Departamento de Engenharia Nuclear

    2017-07-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  9. Overview of the West Valley Vitrification Facility transfer cart control system

    International Nuclear Information System (INIS)

    Bradley, E.C.; Rupple, F.R.

    1993-01-01

    Oak Ridge National Laboratory (ORNL) has designed the control system for the West Valley Demonstration Project Vitrification Facility transfer cart. The transfer cart will transfer canisters of vitrified high-level waste remotely within the Vitrification Facility. The control system will operate the cart under battery power by wireless control. The equipment includes cart mounted control electronics, battery charger, control pendants, engineer's console, and facility antennas

  10. A high-performance digital control system for TCV

    International Nuclear Information System (INIS)

    Lister, J.B.; Dutch, M.J.; Milne, P.G.; Means, R.W.

    1997-10-01

    The TCV hybrid analogue-digital plasma control system has been superseded by a high performance Digital Plasma Control System, DPCS, made possible by recent advances in off the shelf technology. We discuss the basic requirements for such a control system and present the design and specifications which were laid down. The nominal and final performances are presented and the complete design is given in detail. The integration of the new system into the current operation of the TCV tokamak is described. The procurement of this system has required close collaboration between the end-users and two commercial suppliers with one of the latter taking full responsibility for the system integration. The impact of this approach on the design and commissioning costs for the TCV project is presented. New possibilities offered by this new system are discussed, including possible work relevant to ITER plasma control development. (author) 3 figs., 5 refs

  11. A high-performance digital control system for TCV

    Energy Technology Data Exchange (ETDEWEB)

    Lister, J.B.; Dutch, M.J. [Ecole Polytechnique Federale, Lausanne (Switzerland). Centre de Recherche en Physique des Plasma (CRPP); Milne, P.G. [Pentland System Ltd., Livingstone (United Kingdom); Means, R.W. [HNC Software Inc., San Diego, CA (United States)

    1997-10-01

    The TCV hybrid analogue-digital plasma control system has been superseded by a high performance Digital Plasma Control System, DPCS, made possible by recent advances in off the shelf technology. We discuss the basic requirements for such a control system and present the design and specifications which were laid down. The nominal and final performances are presented and the complete design is given in detail. The integration of the new system into the current operation of the TCV tokamak is described. The procurement of this system has required close collaboration between the end-users and two commercial suppliers with one of the latter taking full responsibility for the system integration. The impact of this approach on the design and commissioning costs for the TCV project is presented. New possibilities offered by this new system are discussed, including possible work relevant to ITER plasma control development. (author) 3 figs., 5 refs.

  12. A study on improvement of export control system for the nuclear facility

    International Nuclear Information System (INIS)

    Kim, Ok Joo; Shin, Dong Hoon; Yang, Seung Hyo

    2012-01-01

    The Republic of Korea joined Nuclear Suppliers Group(NSG) in 1995 and became a major nuclear supplier both in name and reality by contracting the Project of UAE Braka Nuclear Power Plant(BNPP) in 2009 and the Project of Jordan Research and Training Reactor(JRTR) in 2010. And ROK is currently negotiating with several countries such as Finland and Vietnam for more projects, so it is expected to obtain more orders of commercial and research reactor. At this point of time, we found that it is difficult to apply individual export licensing system as it is for the big nuclear project such as BNPP and JRTR Project. Because the nuclear project in foreign country contains transfer of thousands of items and technical documents, including a considerable number of strategic items, issuing individual licenses for all items and documents can cause the inefficiency of the project. So, an appropriate export control system which can support such a project is necessary. In this study, we focused on how to improve the export control system to guarantee not only time efficiency but careful management of strategic goods

  13. HPT Clearance Control: Intelligent Engine Systems-Phase 1

    Science.gov (United States)

    2005-01-01

    The following work has been completed to satisfy the Phase I Deliverables for the "HPT Clearance Control" project under NASA GRC's "Intelligent Engine Systems" program: (1) Need for the development of an advanced HPT ACC system has been very clearly laid out, (2) Several existing and potential clearance control systems have been reviewed, (3) A scorecard has been developed to document the system, performance (fuel burn, range, payload, etc.), thermal, and mechanical characteristics of the existing clearance control systems, (4) Engine size and flight cycle selection for the advanced HPT ACC system has been reviewed with "large engine"/"long range mission" combination showing the most benefit, (5) A scoring criteria has been developed to tie together performance parameters for an objective, data driven comparison of competing systems, and (6) The existing HPT ACC systems have been scored based on this scoring system.

  14. Open Hardware for CERN's accelerator control systems

    International Nuclear Information System (INIS)

    Bij, E van der; Serrano, J; Wlostowski, T; Cattin, M; Gousiou, E; Sanchez, P Alvarez; Boccardi, A; Voumard, N; Penacoba, G

    2012-01-01

    The accelerator control systems at CERN will be upgraded and many electronics modules such as analog and digital I/O, level converters and repeaters, serial links and timing modules are being redesigned. The new developments are based on the FPGA Mezzanine Card, PCI Express and VME64x standards while the Wishbone specification is used as a system on a chip bus. To attract partners, the projects are developed in an 'Open' fashion. Within this Open Hardware project new ways of working with industry are being evaluated and it has been proven that industry can be involved at all stages, from design to production and support.

  15. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  16. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  17. Software quality assurance plan for the National Ignition Facility integrated computer control system

    International Nuclear Information System (INIS)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project's controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy's (DOE's) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project

  18. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  19. IPbus A flexible Ethernet-based control system for xTCA hardware

    CERN Document Server

    Williams, Thomas Stephen

    2014-01-01

    The ATCA and uTCA standards include industry-standard data pathway technologies such as Gigabit Ethernet which can be used for control communication, but no specific hardware control protocol is defined. The IPbus suite of software and firmware implements a reliable high-performance control link for particle physics electronics, and has successfully replaced VME control in several large projects. In this paper, we outline the IPbus system architecture, and describe recent developments in the reliability, scalability and performance of IPbus systems, carried out in preparation for deployment of uTCA-based CMS upgrades before the LHC 2015 run. We also discuss plans for future development of the IPbus suite.SUMMARY IPbus will be used for controlling the uTCA electronics in the CMS HCAL, TCDS, Pixel and Level-1 trigger upgrades. IPbus control has already been extensively used in the work of these upgrade projects so far, and final uTCA systems will be deployed in the experiment starting from Autumn 2014. IPbus is...

  20. Control panel and indicators for production control in building projects

    Directory of Open Access Journals (Sweden)

    Orihuela Pablo

    2018-02-01

    Full Text Available In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230, presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

  1. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  2. Development of a multimode navigation system for an assistive robotics project

    OpenAIRE

    Cherubini , Andrea; Oriolo , G; Macri , F; Aloise , F; Babiloni , F; Cincotti , F; Mattia , D

    2007-01-01

    International audience; Assistive technology is an emerging area where robotic devices can be used to strengthen the residual abilities of individuals with motor disabilities or to help them achieve independence in the activities of daily living. This paper deals with a project aimed at designing a system that provides remote control of home-installed appliances, including the Sony AIBO, a commercial mobile robot. The development of the project is described by focusing on the design of the ro...

  3. Apollo Soyuz Test Project Weights and Mass Properties Operational Management System

    Science.gov (United States)

    Collins, M. A., Jr.; Hischke, E. R.

    1975-01-01

    The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.

  4. Model based controls and the AGS booster controls system architecture

    International Nuclear Information System (INIS)

    Casella, R.A.

    1987-01-01

    For the past three years the Accelerator Controls Section has been responsible for the development of the Heavy Ion Transfer Line (HITL) used to inject heavy ions created at the Tandem Van de Graaff into the Alternating Gradient Synchrotron (AGS). This was recognized as an opportunity to test new ideas for control of a beam line, which if successful, could be implemented in an upgrade of the existing control system for the AGS. The in place control system for the AGS consisted of DEC PDP10 computer as the primary computer interface to the accelerator via three control room consoles, and keeper of the device database. For the HITL project it was decided to make the control system a true distributed network putting more computing power down at the device level via intelligent subsystems. A network of Apollo workstations was added at the host level. Apollos run a distributed operating system and are connected to each other by the Domain Token Ring Network. The Apollos were seen as the new primary computers for consoles with each console containing at least one Apollo. These hosts and all other subsystems are connected to each other via an in house developed LAN (RELWAY). The design of the control system developed for HITL was mostly successful. The proposed AGS Booster is designed to be a synchrotron injector for the AGS. With the forthcoming development of the Booster for the AGS an opportunity has again developed to implement new ideas for accelerator control. One weakness of the HITL control system is the limited cpu power and poor debugging facilities of the stations

  5. Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid

    Science.gov (United States)

    Kuwayama, Akira

    The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.

  6. Application study of EPICS-based redundant method for reactor control system

    International Nuclear Information System (INIS)

    Zhang Ning; Han Lifeng; Chen Yongzhong; Guo Bing; Yin Congcong

    2013-01-01

    In the reactor control system prototype development of TMSR (Thorium Molten Salt Reactor system, CAS) project, EPICS (Experimental Physics and Industrial Control System) is adopted as Instrument and Control software platform. For the aim of IOC (Input/Output Controller) redundancy and data synchronization of the system, the EPICS-based RMT (Redundancy Monitor Task ) software package and its data-synchronization component CCE (Continuous Control Executive) were introduced. By the development of related IOC driver, redundant switch-over control of server IOC was implemented. The method of redundancy implementation using RMT in server and redundancy performance test for power control system are discussed in this paper. (authors)

  7. Optimization of the central automatic control of a small Dutch sewer system

    Science.gov (United States)

    Kolechkina, A. G.; Hoes, O. A. C.

    2012-04-01

    A sewer control system was developed in the context of a subsidized project aiming at improvement of surface water quality by control of sewer systems and surface water systems. The project was coordinated by the local water board, "Waterschap Hollandse Delta". Other participants were Delft University of Technology, Deltares and the municipalities Strijen, Cromstrijen, Westmaas, Oud Beijerland and Piershil. As part of the project there were two pilot implementations where a central automatic controller was coupled to the existing SCADA system. For these two pilots the system is now operational. A Dutch urban area in the western part of the Netherlands is usually part of a polder, which is effectively an artificially drained catchment. The urban area itself is split into small subcatchments that manage runoff in different ways. In all cases a large fraction goes into the natural hydrological cycle, but, depending on the design of the local sewer system, a larger or smaller part finds its way into the sewer system. Proper control of this flow is necessary to control surface water quality and to avoid health risks from flow from the sewer into the streets. At each time step the controller switches pumps to distribute the remaining water in the system at the end of the time step over the different subcatchments. The distribution is created based on expert judgment of the relative vulnerability and subcatchment sewer system water quality. It is implemented in terms curves of total system stored volume versus subcatchment stored volume. We describe the process of the adaptation of a controller to two different sewer systems and the understanding of the artificial part of the catchment we gained during this process. In the process of adaptation the type of sewer system (combined foul water and storm water transport or separate foul water and storm water transport) played a major role.

  8. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  9. Impact of water control projects on fisheries resources in Bangladesh

    Science.gov (United States)

    Mirza, Monirul Qader; Ericksen, Neil J.

    1996-07-01

    Bangladesh is a very flat delta built up by the Ganges—Brahmaputra—Meghna/Barak river systems. Because of its geographical location, floods cause huge destruction of lives and properties almost every year. Water control programs have been undertaken to enhance development through mitigating the threat of disasters. This structural approach to flood hazard has severely affected floodplain fisheries that supply the major share of protein to rural Bangladesh, as exemplified by the Chandpur Irrigation Project. Although the regulated environment of the Chandpur project has become favorable for closed-water cultured fish farming, the natural open-water fishery loss has been substantial. Results from research show that fish yields were better under preproject conditions. Under project conditions per capita fish consumption has dropped significantly, and the price of fish has risen beyond the means of the poor people, so that fish protein in the diet of poor people is gradually declining. Bangladesh is planning to expand water control facilities to the remaining flood-prone areas in the next 15 20 years. This will cause further loss of floodplain fisheries. If prices for closed-water fish remain beyond the buying power of the poor, alternative sources of cheap protein will be required.

  10. Adaptive modified projective synchronization of a unified chaotic system with an uncertain parameter

    International Nuclear Information System (INIS)

    Park, Ju H.

    2007-01-01

    An adaptive modified projective synchronization (AMPS) is proposed to acquire a general kind of proportional relationship between the drive and response systems. Based on the Lyapunov stability theory, a nonlinear control scheme for the synchronization has been presented. The control performances are verified by numerical simulations

  11. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  12. Automated reasoning in man-machine control systems

    International Nuclear Information System (INIS)

    Stratton, R.C.; Lusk, E.L.

    1983-01-01

    This paper describes a project being undertaken at Argonne National Laboratory to demonstrate the usefulness of automated reasoning techniques in the implementation of a man-machine control system being designed at the EBR-II nuclear power plant. It is shown how automated reasoning influences the choice of optimal roles for both man and machine in the system control process, both for normal and off-normal operation. In addition, the requirements imposed by such a system for a rigorously formal specification of operating states, subsystem states, and transition procedures have a useful impact on the analysis phase. The definitions and rules are discussed for a prototype system which is physically simple yet illustrates some of the complexities inherent in real systems

  13. Use of the project management methodology to establish physical protection system at nuclear facility

    International Nuclear Information System (INIS)

    Gramotkin, F.; Kuzmyak, I.; Kravtsov, V.

    2015-01-01

    The paper considers the possibility of using the project management methodology developed by the Project Management Institute (USA) in nuclear security in terms of modernization or development of physical protection system at nuclear facility. It was demonstrated that this methodology allows competent and flexible management of the projects on physical protection, ensuring effective control of their timely implementation in compliance with the planned budget and quality

  14. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    Science.gov (United States)

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  15. Radiation control in the core shroud replacement project of Fukushima-Daiichi NPS Unit no.2

    International Nuclear Information System (INIS)

    Kokubun, Yasunori; Haraguchi, Kazuyuki; Yoshizawa, Yuji; Yamada, Yasuo

    2000-01-01

    In Fukushima-Daiichi NPS Unit no.2, the core shroud replacement was made following that of Unit no.3. This project involves replacement of wide-ranging equipment, with the project extending over a long period of time. This was expected to increase the dose equivalent of workers. Accordingly, various measures to lower the dose equivalent were planned and implemented. We outline radiation controls implemented during the project period. The shroud replacement project was a preventive maintenance project which consisted of replacing the core shroud and other internals with those less susceptible to stress corrosion cracking. Problems related to radiation control during the replacement project of Unit no.3 the year before last were summarized. We studied, planned, and implemented measures to be reflected in the project for Unit no.2. This was done to lower the dose equivalent as much as possible while paying due attention to safety and economy. For radiation control during the project for Unit no.2, experiments with Unit no.3 were fully exploited and any effective measures taken at that time were adopted in this project. Problems pointed out after that project with Unit no.3 resulted in new or improved measures being taken with Unit no.2. Measures taken over from the project with Unit no.3; a. Daily analysis of difference between expected and actual dose equivalents b. Dose reduction measures, chemical decontamination, temporary shield, flushing, etc.; New or improved measures; a. Dose reduction measures: Mechanical removal of radiation sources, strengthening of shield, etc.; b. Automatic remote control system; c. Use of new protective devices. With measures implemented as described above, the dose equivalent during shroud replacement of Unit no.2 was reduced by about 30% when compared with that (11.5 persons · Sv) in the case of Unit no.3. Implemented radiation controls will be checked and reviewed in future for reflection in projects with other units. (author)

  16. Composite Control of the n–link Chained Mechanical Systems

    Czech Academy of Sciences Publication Activity Database

    Zikmund, Jiří

    2008-01-01

    Roč. 44, č. 5 (2008), s. 664-684 ISSN 0023-5954 R&D Projects: GA ČR(CZ) GA102/08/0186 Institutional research plan: CEZ:AV0Z10750506 Keywords : nonlinear systems * exact linearization * underactuated mechanical systems Subject RIV: BC - Control Systems Theory Impact factor: 0.281, year: 2008

  17. NERI PROJECT 99-119. TASK 1. ADVANCED CONTROL TOOLS AND METHODS. FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    March-Leuba, J.A.

    2002-09-09

    Nuclear plants of the 21st century will employ higher levels of automation and fault tolerance to increase availability, reduce accident risk, and lower operating costs. Key developments in control algorithms, fault diagnostics, fault tolerance, and communication in a distributed system are needed to implement the fully automated plant. Equally challenging will be integrating developments in separate information and control fields into a cohesive system, which collectively achieves the overall goals of improved performance, safety, reliability, maintainability, and cost-effectiveness. Under the Nuclear Energy Research Initiative (NERI), the U. S. Department of Energy is sponsoring a project to address some of the technical issues involved in meeting the long-range goal of 21st century reactor control systems. This project, ''A New Paradigm for Automated Development Of Highly Reliable Control Architectures For Future Nuclear Plants,'' involves researchers from Oak Ridge National Laboratory, University of Tennessee, and North Carolina State University. This paper documents a research effort to develop methods for automated generation of control systems that can be traced directly to the design requirements. Our final goal is to allow the designer to specify only high-level requirements and stress factors that the control system must survive (e.g. a list of transients, or a requirement to withstand a single failure.) To this end, the ''control engine'' automatically selects and validates control algorithms and parameters that are optimized to the current state of the plant, and that have been tested under the prescribed stress factors. The control engine then automatically generates the control software from validated algorithms. Examples of stress factors that the control system must ''survive'' are: transient events (e.g., set-point changes, or expected occurrences such a load rejection,) and postulated

  18. Comparison between iterative wavefront control algorithm and direct gradient wavefront control algorithm for adaptive optics system

    Science.gov (United States)

    Cheng, Sheng-Yi; Liu, Wen-Jin; Chen, Shan-Qiu; Dong, Li-Zhi; Yang, Ping; Xu, Bing

    2015-08-01

    Among all kinds of wavefront control algorithms in adaptive optics systems, the direct gradient wavefront control algorithm is the most widespread and common method. This control algorithm obtains the actuator voltages directly from wavefront slopes through pre-measuring the relational matrix between deformable mirror actuators and Hartmann wavefront sensor with perfect real-time characteristic and stability. However, with increasing the number of sub-apertures in wavefront sensor and deformable mirror actuators of adaptive optics systems, the matrix operation in direct gradient algorithm takes too much time, which becomes a major factor influencing control effect of adaptive optics systems. In this paper we apply an iterative wavefront control algorithm to high-resolution adaptive optics systems, in which the voltages of each actuator are obtained through iteration arithmetic, which gains great advantage in calculation and storage. For AO system with thousands of actuators, the computational complexity estimate is about O(n2) ˜ O(n3) in direct gradient wavefront control algorithm, while the computational complexity estimate in iterative wavefront control algorithm is about O(n) ˜ (O(n)3/2), in which n is the number of actuators of AO system. And the more the numbers of sub-apertures and deformable mirror actuators, the more significant advantage the iterative wavefront control algorithm exhibits. Project supported by the National Key Scientific and Research Equipment Development Project of China (Grant No. ZDYZ2013-2), the National Natural Science Foundation of China (Grant No. 11173008), and the Sichuan Provincial Outstanding Youth Academic Technology Leaders Program, China (Grant No. 2012JQ0012).

  19. Generalized projective chaos synchronization of gyroscope systems subjected to dead-zone nonlinear inputs

    International Nuclear Information System (INIS)

    Yau, H.-T.

    2008-01-01

    This Letter presents a robust control scheme to generalized projective synchronization between two identical two-degrees-of-freedom heavy symmetric gyroscopes with dead zone nonlinear inputs. Because of the nonlinear terms of the gyroscope system, the system exhibits complex and chaotic motions. By the Lyapunov stability theory with control terms, two suitable sliding surfaces are proposed to ensure the stability of the controlled closed-loop system in sliding mode. Then, two sliding mode controllers (SMC) are designed to guarantee the hitting of the sliding surfaces even when the control inputs contain dead-zone nonlinearity. This method allows us to arbitrarily direct the scaling factor onto a desired value. Numerical simulations show that this method works very well for the proposed controller

  20. Hierarchical Control for Optimal and Distributed Operation of Microgrid Systems

    DEFF Research Database (Denmark)

    Meng, Lexuan

    manages the power flow with external grids, while the economic and optimal operation of MGs is not guaranteed by applying the existing schemes. Accordingly, this project dedicates to the study of real-time optimization methods for MGs, including the review of optimization algorithms, system level...... mathematical modeling, and the implementation of real-time optimization into existing hierarchical control schemes. Efficiency enhancement in DC MGs and optimal unbalance compensation in AC MGs are taken as the optimization objectives in this project. Necessary system dynamic modeling and stability analysis......, a discrete-time domain modeling method is proposed to establish an accurate system level model. Taking into account the different sampling times of real world plant, digital controller and communication devices, the system is modeled with these three parts separately, and with full consideration...

  1. An Approach of Tracking Control for Chaotic Systems

    Directory of Open Access Journals (Sweden)

    Jin Xing

    2016-01-01

    Full Text Available Combining the ergodicity of chaos and the Jacobian matrix, we design a general tracking controller for continuous and discrete chaotic systems. The control scheme has the ability to track a bounded reference signal. We prove its globally asymptotic stability and extend it to generalized projective synchronization. Numerical simulations verify the effectiveness of the proposed scheme.

  2. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  3. Limerick BWR turbine control and protection system upgrade success

    International Nuclear Information System (INIS)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A.; Williams, J.C.

    2015-01-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  4. Limerick BWR turbine control and protection system upgrade success

    Energy Technology Data Exchange (ETDEWEB)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A., E-mail: tangck@westinghouse.com, E-mail: pietryt@westinghouse, E-mail: federipa@westinghouse.com [Westinghouse Electric Company, LLC, Cranberry Township, PA (United States); Williams, J.C., E-mail: Jonathan.Williams@exeloncorp.com [Exelon Nuclear, Warrenville, IL (United States)

    2015-07-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  5. Intelligent automated control of robotic systems for environmental restoration

    International Nuclear Information System (INIS)

    Harrigan, R.W.

    1992-01-01

    The US Department of Energy's Office of Technology Development (OTD) has sponsored the development of the Generic Intelligent System Controller (GISC) for application to remote system control. Of primary interest to the OTD is the development of technologies which result in faster, safer, and cheaper cleanup of hazardous waste sites than possible using conventional approaches. The objective of the GISC development project is to support these goals by developing a modular robotics control approach which reduces the time and cost of development by allowing reuse of control system software and uses computer models to improve the safety of remote site cleanup while reducing the time and life cycle costs

  6. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  7. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Science.gov (United States)

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  8. Multicontroller: an object programming approach to introduce advanced control algorithms for the GCS large scale project

    CERN Document Server

    Cabaret, S; Coppier, H; Rachid, A; Barillère, R; CERN. Geneva. IT Department

    2007-01-01

    The GCS (Gas Control System) project team at CERN uses a Model Driven Approach with a Framework - UNICOS (UNified Industrial COntrol System) - based on PLC (Programming Language Controller) and SCADA (Supervisory Control And Data Acquisition) technologies. The first' UNICOS versions were able to provide a PID (Proportional Integrative Derivative) controller whereas the Gas Systems required more advanced control strategies. The MultiController is a new UNICOS object which provides the following advanced control algorithms: Smith Predictor, PFC (Predictive Function Control), RST* and GPC (Global Predictive Control). Its design is based on a monolithic entity with a global structure definition which is able to capture the desired set of parameters of any specific control algorithm supported by the object. The SCADA system -- PVSS - supervises the MultiController operation. The PVSS interface provides users with supervision faceplate, in particular it links any MultiController with recipes: the GCS experts are ab...

  9. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  10. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chansuh; Seo, Hana; Choi, Sundo [Korea Institute of Nuclear Nonproliferation And Control, Daejeon (Korea, Republic of)

    2014-05-15

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose.

  11. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    International Nuclear Information System (INIS)

    Lee, Chansuh; Seo, Hana; Choi, Sundo

    2014-01-01

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose

  12. Holarchical Systems and Emotional Holons : Biologically-Inspired System Designs for Control of Autonomous Aerial Vehicles

    Science.gov (United States)

    Ippolito, Corey; Plice, Laura; Pisanich, Greg

    2003-01-01

    The BEES (Bio-inspired Engineering for Exploration Systems) for Mars project at NASA Ames Research Center has the goal of developing bio-inspired flight control strategies to enable aerial explorers for Mars scientific investigations. This paper presents a summary of our ongoing research into biologically inspired system designs for control of unmanned autonomous aerial vehicle communities for Mars exploration. First, we present cooperative design considerations for robotic explorers based on the holarchical nature of biological systems and communities. Second, an outline of an architecture for cognitive decision making and control of individual robotic explorers is presented, modeled after the emotional nervous system of cognitive biological systems. Keywords: Holarchy, Biologically Inspired, Emotional UAV Flight Control

  13. Integrated Design Tools for Embedded Control Systems

    NARCIS (Netherlands)

    Jovanovic, D.S.; Hilderink, G.H.; Broenink, Johannes F.; Karelse, F.

    2001-01-01

    Currently, computer-based control systems are still being implemented using the same techniques as 10 years ago. The purpose of this project is the development of a design framework, consisting of tools and libraries, which allows the designer to build high reliable heterogeneous real-time embedded

  14. Metrics-based control in outsourced software development projects

    NARCIS (Netherlands)

    Ponisio, Laura; van Eck, Pascal

    2012-01-01

    Measurements have been recognised as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of

  15. Adding Shareholder Value through Project Performance Measurement, Monitoring & Control

    NARCIS (Netherlands)

    M.M. Akalu; J.R. Turner (Rodney)

    2002-01-01

    textabstractWe present the various views and methods of measuring and controlling project performance, and factors affecting a project. The review indicates that there is a shift in the type and understanding of factors of project success or failure. However, the presence of various measurement

  16. Simulation of slag control for the Plasma Hearth Project

    International Nuclear Information System (INIS)

    Power, M.A.; Carney, K.P.; Peters. G.G.

    1996-01-01

    The goal of the Plasma Hearth Project is to stabilize alpha-emitting radionuclides in a vitreous slag and to reduce the effective storage volume of actinide-containing waste for long-term burial. The actinides have been shown to partition into the vitreous slag phase of the melt. The slag composition may be changed by adding glass-former elements to ensure that this removable slag has the most desired physical and chemical properties for long-term burial. A data acquisition and control system has been designed to regulate the composition of five elements in the slag

  17. Testing and Quality Assurance of the Control System During NIF Commissioning

    International Nuclear Information System (INIS)

    Casavant, D.; Carey, R.; Cline, B.; Lagin, L.; Ludwigsen, P.; Reddi, U.; Van Arsdall, P.

    2003-01-01

    The strategy used to develop the National Ignition Facility Integrated Computer Control System (NIF ICCS) calls for incremental cycles of construction and formal test to deliver nearly one million lines of code. Software releases that implement specific functionality are approved for deployment when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance and interface requirements using test procedures derived from system requirements. At this stage of the project the controls team has delivered approximately 3/4 of the planned software by performing dozens of development and test cycles within offline test facilities and followed by online tests to confirm integrated operation in the NIF. Test incidents are recorded and tracked from development to successful deployment by the verification team, with hardware and software changes approved by the appropriate change control board. Project metrics are generated by the Software Quality Assurance manager and monitored by ICCS management. Test results are summarized and reported to responsible individuals and Project managers under a work authorization and permit process that assesses risk and evaluates control system upgrade readiness. NIF is well into the first phases of its laser commissioning program to characterize and operate the first four laser beams and target systems. The integrated control system has successfully fired over 100 coordinated shots into beam diagnostics and an initial set of target diagnostics in the 10-m diameter target chamber. Extensive experience has been gained by integrating controls in prototype laboratories and in the NIF. This paper will discuss NIF's software QC and QA processes, capabilities of offline test facilities, and metrics collection

  18. Exe-Guard Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Lab., Inc., Pullman, WA (United States); Marshall, Tim [Dominion Virginia Power, Richmond, VA (United States); Chavez, Adrian [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Bratus, Sergey [Dartmouth College, Hanover, NH (United States)

    2016-01-30

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical

  19. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  20. Development of controlled drilling system

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Miyakawa, Kimio; Suzuki, Koichi; Sunaga, Takayuki

    2008-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for the High Level Radioactive Waste (HLW) disposal. Especially, the soft sedimentary rock at the offshore, region is thought to be one of the best candidates, since there is no driving force of the underground water. The measurement and logging in the bore hole in order to check the hydro-geological and geomechanical conditions of the host rock is a very important way to examine the potentially of the disposal candidates. The CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project about the controlled drilling technology and the measurement and logging technologies in its borehole. In 2000, as the beginning year of the project, we made the conceptual design of the drilling and measuring systems, and made key tools concerning each technology on an experimental basis. We have been developing sub tools constructing drilling and measuring systems since 2000, and applying these systems to the Horonobe site recent 5 years. We will briefly report the outline of the system and the results of drilling and measurement that were carried out at the Horonobe site. (author)

  1. The step from the project control to long-distance control; Von der Projekt- zur Fernkontrolle

    Energy Technology Data Exchange (ETDEWEB)

    Kaelin, W. [Ingenieurbuero Werner Kaelin, Schwyz (Switzerland)

    1995-12-31

    In chapter 8 of the anthology about building control the extension from project control to long-distance control is described. The following aspects are discussed: guidelines (operating concept, task anthology), project (implementation, control, documentation), realisation (initiation, example), operation (regional co-operation, characteristic numbers). (BWI) [Deutsch] Kapitel 8 des Sammelbandes ueber Building Control ist dem Ausbau von der Projekt- zur Fernkontrolle gewidmet. In diesem Zusammenhang werden folgende Themen angesprochen: Vorgaben (Betriebskonzept, Pflichtenheft), Projekt (Umsetzung, Kontrolle, Dokumentation), Ausfuehrung (Inbetriebsetzung, Beispiel); Betrieb (regionaler Zusammenschluss, Kennzahlen). (BWI)

  2. Software management of the LHC Detector Control Systems

    CERN Document Server

    Varela, F

    2007-01-01

    The control systems of each of the four Large Hadron Collider (LHC) experiments will contain of the order of 150 computers running the back-end applications. These applications will have to be maintained and eventually upgraded during the lifetime of the experiments, ~20 years. This paper presents the centralized software management strategy adopted by the Joint COntrols Project (JCOP) [1], which is based on a central database that holds the overall system configuration. The approach facilitates the integration of different parts of a control system and provides versioning of its various software components. The information stored in the configuration database can eventually be used to restore a computer in the event of failure.

  3. Software management of the LHC detector control systems

    CERN Document Server

    Varela, F

    2007-01-01

    The control systems of each of the four Large Hadron Collider (LHC) experiments will contain of the order of 150 computers running the back-end applications. These applications will have to be maintained and eventually upgraded during the lifetime of the experiments, ~20 years. This paper presents the centralized software management strategy adopted by the Joint COntrols Project (JCOP) [1], which is based on a central database that holds the overall system configuration. The approach facilitates the integration of different parts of a control system and provides versioning of its various software components. The information stored in the configuration database can eventually be used to restore a computer in the event of failure.

  4. Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

    Science.gov (United States)

    Mizukami, Masahi

    2004-01-01

    An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

  5. Multirate flutter suppression system design for the Benchmark Active Controls Technology Wing

    Science.gov (United States)

    Berg, Martin C.; Mason, Gregory S.

    1994-01-01

    To study the effectiveness of various control system design methodologies, the NASA Langley Research Center initiated the Benchmark Active Controls Project. In this project, the various methodologies will be applied to design a flutter suppression system for the Benchmark Active Controls Technology (BACT) Wing (also called the PAPA wing). Eventually, the designs will be implemented in hardware and tested on the BACT wing in a wind tunnel. This report describes a project at the University of Washington to design a multirate flutter suppression system for the BACT wing. The objective of the project was two fold. First, to develop a methodology for designing robust multirate compensators, and second, to demonstrate the methodology by applying it to the design of a multirate flutter suppression system for the BACT wing. The contributions of this project are (1) development of an algorithm for synthesizing robust low order multirate control laws (the algorithm is capable of synthesizing a single compensator which stabilizes both the nominal plant and multiple plant perturbations; (2) development of a multirate design methodology, and supporting software, for modeling, analyzing and synthesizing multirate compensators; and (3) design of a multirate flutter suppression system for NASA's BACT wing which satisfies the specified design criteria. This report describes each of these contributions in detail. Section 2.0 discusses our design methodology. Section 3.0 details the results of our multirate flutter suppression system design for the BACT wing. Finally, Section 4.0 presents our conclusions and suggestions for future research. The body of the report focuses primarily on the results. The associated theoretical background appears in the three technical papers that are included as Attachments 1-3. Attachment 4 is a user's manual for the software that is key to our design methodology.

  6. Autonomous Control Capabilities for Space Reactor Power Systems

    International Nuclear Information System (INIS)

    Wood, Richard T.; Neal, John S.; Brittain, C. Ray; Mullens, James A.

    2004-01-01

    The National Aeronautics and Space Administration's (NASA's) Project Prometheus, the Nuclear Systems Program, is investigating a possible Jupiter Icy Moons Orbiter (JIMO) mission, which would conduct in-depth studies of three of the moons of Jupiter by using a space reactor power system (SRPS) to provide energy for propulsion and spacecraft power for more than a decade. Terrestrial nuclear power plants rely upon varying degrees of direct human control and interaction for operations and maintenance over a forty to sixty year lifetime. In contrast, an SRPS is intended to provide continuous, remote, unattended operation for up to fifteen years with no maintenance. Uncertainties, rare events, degradation, and communications delays with Earth are challenges that SRPS control must accommodate. Autonomous control is needed to address these challenges and optimize the reactor control design. In this paper, we describe an autonomous control concept for generic SRPS designs. The formulation of an autonomous control concept, which includes identification of high-level functional requirements and generation of a research and development plan for enabling technologies, is among the technical activities that are being conducted under the U.S. Department of Energy's Space Reactor Technology Program in support of the NASA's Project Prometheus. The findings from this program are intended to contribute to the successful realization of the JIMO mission

  7. Formal verification of industrial control systems

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    Verification of critical software is a high priority but a challenging task for industrial control systems. For many kinds of problems, testing is not an efficient method. Formal methods, such as model checking appears to be an appropriate complementary method. However, it is not common to use model checking in industry yet, as this method needs typically formal methods expertise and huge computing power. In the EN-ICE-PLC section, we are working on a [methodology][1] and a tool ([PLCverif][2]) to overcome these challenges and to integrate formal verification in the development process of our PLC-based control systems. [1]: http://cern.ch/project-plc-formalmethods [2]: http://cern.ch/plcverif

  8. The Automation Control System Design of Walking Beam Heating Furnace

    OpenAIRE

    Hong-Yu LIU; Jun-Qing LIU; Jun-Jie XI

    2014-01-01

    Combining the transformation project of certain strip steel rolling production line, the techniques process of walking beam heating furnace was elaborated in this paper. The practical application of LOS-T18-2ZC1 laser detector was elaborated. The network communication model of walking beam heating furnace control system was designed. The realization method of production process automation control was elaborated. The entire automation control system allocation picture and PLC power distributio...

  9. Instrument control software development process for the multi-star AO system ARGOS

    Science.gov (United States)

    Kulas, M.; Barl, L.; Borelli, J. L.; Gässler, W.; Rabien, S.

    2012-09-01

    The ARGOS project (Advanced Rayleigh guided Ground layer adaptive Optics System) will upgrade the Large Binocular Telescope (LBT) with an AO System consisting of six Rayleigh laser guide stars. This adaptive optics system integrates several control loops and many different components like lasers, calibration swing arms and slope computers that are dispersed throughout the telescope. The purpose of the instrument control software (ICS) is running this AO system and providing convenient client interfaces to the instruments and the control loops. The challenges for the ARGOS ICS are the development of a distributed and safety-critical software system with no defects in a short time, the creation of huge and complex software programs with a maintainable code base, the delivery of software components with the desired functionality and the support of geographically distributed project partners. To tackle these difficult tasks, the ARGOS software engineers reuse existing software like the novel middleware from LINC-NIRVANA, an instrument for the LBT, provide many tests at different functional levels like unit tests and regression tests, agree about code and architecture style and deliver software incrementally while closely collaborating with the project partners. Many ARGOS ICS components are already successfully in use in the laboratories for testing ARGOS control loops.

  10. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  11. Development of linear flow rate control system for eccentric butter-fly valve

    International Nuclear Information System (INIS)

    Kwak, K. K.; Cho, S. W.; Park, J. S.; Cho, J. H.; Song, I. T.; Kim, J. G.; Kwon, S. J.; Kim, I. J.; Park, W. K.

    1999-12-01

    Butter-fly valves are advantageous over gate, globe, plug, and ball valves in a variety of installations, particularly in the large sizes. The purpose of this project development of linear flow rate control system for eccentric butter-fly valve (intelligent butter-fly valve system). The intelligent butter-fly valve system consist of a valve body, micro controller. The micro controller consist of torque control system, pressure censor, worm and worm gear and communication line etc. The characteristics of intelligent butter-fly valve system as follows: Linear flow rate control function. Digital remote control function. guard function. Self-checking function. (author)

  12. System design description for Waste Information and Control System

    International Nuclear Information System (INIS)

    Harris, R.R.

    1994-01-01

    The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as the Waste Information and Control System (WICS). WICS shall partially automate the procedure for acquisition, tracking and reporting of the container, drum, and waste data that is currently manually processed. The WICS project shall use handheld computer units (HCU) to collect laboratory data, a local database with an user friendly interface to import the laboratory data from the HCUs, and barcode technology with associated software and operational procedures. After the container, drum, and waste data has been collected and verified, WICS shall be manipulated to provide informal reports containing data required to properly document waste disposal. 8 refs, 82 figs, 69 tabs

  13. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  14. Application of the Performance Validation Tool for the Evaluation of NSSS Control System Performance

    International Nuclear Information System (INIS)

    Sohn, Suk-whun

    2011-01-01

    When a control system is supplied to nuclear power plant (NPP) under construction, static tests and dynamic tests are typically performed for evaluating its performance. The dynamic test is not realistic for validating the performance of the replaced hardware in operating NPPs because of potential risks and economic burden. We have, therefore, developed a performance validation tool which can evaluate the dynamic performances of the control system without undertaking real plant tests. The window-based nuclear plant performance analyzer (Win-NPA) is used as a virtual NPP in the developed tool and provides appropriate control loads to the target control system via hardwired cables in a manner that the interfaces are identical to the field wiring. The outputs from the control system are used as the simulation inputs of the plant model within the Win-NPA. With this closed-loop configuration, major transient events were simulated to check the performance of the implemented control system by comparing it with that of the control system model of the Win-NPA and that of the old hardware. The developed tool and the methodology were successfully applied to the hardware replacement project for Yonggwang (YGN) 3 and 4 feedwater control system (FWCS) in 2008. Several errors in the implemented control system were fixed through the performance validation tests and the operability tests. As a result, the control system of the YGN 3 and 4 has demonstrated an excellent control performance since then. On the basis of YGN 3 and 4 project experiences, we are performing a similar project in Ulchin (UCN) 3 and 4. This methodology can also be applied to other NPPs under construction as a tool for pre-operational dynamic tests. These performance tests before performing power ascension tests (PATs) are conducive to preventing unnecessary plant transients or unwanted reactor trips caused by hidden errors of control systems during PATs. (author)

  15. Design methodology for fault-tolerant control of advanced driver assistance systems

    NARCIS (Netherlands)

    Gietelink, O.J.; Ploeg, J.; Schutter, B. de; Verhaegen, M.H.G.

    2003-01-01

    The objective of this project is to develop a methodology for the design, testing, evaluation and implementation of control systems for Advanced Driver Assistance Systems (ADAS). Examples of ADAS are collision avoidance systems, lane departure warning systems, pre-crash sensing, and adaptive cruise

  16. Design and test of a girder control system at NSRRC

    International Nuclear Information System (INIS)

    Wang, H.S.; Tsai, Y.L.; Perng, S.Y.; Chen, M.L.; Hsu, K.H.; Lai, W.Y.; Tseng, T.C.; Chen, J.R.

    2012-01-01

    A girder control system is proposed to quickly and precisely adjust the displacement and rotating angle of all girders in the storage ring with little manpower at the Taiwan Photon Source (TPS) project at National Synchrotron Research Center (NSRRC). In this control girder system, six motorized cam movers supporting a girder are driven on three pedestals to perform six-axis adjustments of a girder. A tilt-meter monitors the pitch and roll of each girder; several touch sensors measure the relative displacement between consecutive girders. Moreover, a laser position sensitive detector (PSD) system measuring the relative displacement between straight-section girders is included in this girder control system. Operator can use subroutines developed by MATLAB to control every local girder control system via the web. The test results show that the girder control system adjusts girders quickly, precisely and stably

  17. Calibration method for projector-camera-based telecentric fringe projection profilometry system.

    Science.gov (United States)

    Liu, Haibo; Lin, Huijing; Yao, Linshen

    2017-12-11

    By combining a fringe projection setup with a telecentric lens, a fringe pattern could be projected and imaged within a small area, making it possible to measure the three-dimensional (3D) surfaces of micro-components. This paper focuses on the flexible calibration of the fringe projection profilometry (FPP) system using a telecentric lens. An analytical telecentric projector-camera calibration model is introduced, in which the rig structure parameters remain invariant for all views, and the 3D calibration target can be located on the projector image plane with sub-pixel precision. Based on the presented calibration model, a two-step calibration procedure is proposed. First, the initial parameters, e.g., the projector-camera rig, projector intrinsic matrix, and coordinates of the control points of a 3D calibration target, are estimated using the affine camera factorization calibration method. Second, a bundle adjustment algorithm with various simultaneous views is applied to refine the calibrated parameters, especially the rig structure parameters and coordinates of the control points forth 3D target. Because the control points are determined during the calibration, there is no need for an accurate 3D reference target, whose is costly and extremely difficult to fabricate, particularly for tiny objects used to calibrate the telecentric FPP system. Real experiments were performed to validate the performance of the proposed calibration method. The test results showed that the proposed approach is very accurate and reliable.

  18. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  19. Fuzzy control for optimal operation of complex chilling systems; Betriebsoptimierung von komplexen Kaelteanlagen mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Talebi-Daryani, R. [Fachhochschule Koeln (Germany). Lehrgebiet und Lab. fuer Regelungs- und Gebaeudeleittechnik; Luther, C. [JCI Regelungstechnik GmbH, Koeln (Germany)

    1998-05-01

    The optimization potentials for the operation of chilling systems within the building supervisory control systems are limited to abilities of PLC functions with their binary logic. The aim of this project is to replace inefficient PLC-solutions for the operation of chilling system by a Fuzzy control system. Optimal operation means: reducing operation time and operation costs of the system, reducing cooling energy generation- and consumption costs. Analysis of the thermal behaviour of the building and the chilling system is necessary, in order to find the current efficient cooling potentials and cooling methods during the operation. Three different Fuzzy controller have been developed with a total rule number of just 70. This realized Fuzzy control system is able to forecast the maximum cooling power of the building, but also to determine the cooling potential of the out door air. This new Fuzzy control system has been successfully commissioned, and remarkable improvement of the system behaviour is reached. Comparison of the system behaviour before and after the implementation of Fuzzy control system proved the benefits of the Fuzzy logic based operation system realized here. The system described here is a joint project between the University of applied sciences Cologne, and Johnson Controls International Cologne. The Fuzzy software tool used here (SUCO soft Fuzzy TECH 4.0), was provided by Kloeckner Moeller Bonn. (orig.) [Deutsch] Die Betriebsoptimierung von Kaelteanlagen innerhalb von Gebaeudeleitsystemen ist auf die Faehigkeiten von logischen Steuerverknuepfungen der Digitaltechnik begrenzt. In diesem Zusammenhang kann nur ein geringer Anteil der Information ueber das thermische Speicherverhalten des jeweiligen Gebaeudes herangezogen werden. Ziel des vorliegenden Projektes war es, die unzureichenden logischen Steuerverknuepfungen durch ein Fuzzy-Control-System zu ersetzen, um die Arbeitsweise der Kaelteanlage zu optimieren. Die Optimierungskriterien dieses

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

    Science.gov (United States)

    Bull, John S.; Brown, Richard; Friedland, Peter; Wong, Carla M.; Bates, William

    1987-01-01

    A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

  2. Large distributed control system using Ada in fusion research

    International Nuclear Information System (INIS)

    Van Arsdall, P J; Woodruff, J P.

    1998-01-01

    Construction of the National Ignition Facility laser at Lawrence Livermore National Laboratory features a distributed control system that uses object-oriented software engineering techniques. Control of 60,000 devices is effected using a network of some 500 computers. The software is being written in Ada and communicates through CORBA. Software controls are implemented in two layers: individual device controllers and a supervisory layer. The software architecture provides services in the form of frameworks that address issues common to event-driven control systems. Those services are allocated to levels that strictly prescribe their interdependency so the levels are separately reusable. The project has completed its final design review. The delivery of the first increment takes place in October 1998. Keywords Distributed control system, object-oriented development, CORBA, application frameworks, levels of abstraction

  3. Learning to Control Advanced Life Support Systems

    Science.gov (United States)

    Subramanian, Devika

    2004-01-01

    Advanced life support systems have many interacting processes and limited resources. Controlling and optimizing advanced life support systems presents unique challenges. In particular, advanced life support systems are nonlinear coupled dynamical systems and it is difficult for humans to take all interactions into account to design an effective control strategy. In this project. we developed several reinforcement learning controllers that actively explore the space of possible control strategies, guided by rewards from a user specified long term objective function. We evaluated these controllers using a discrete event simulation of an advanced life support system. This simulation, called BioSim, designed by Nasa scientists David Kortenkamp and Scott Bell has multiple, interacting life support modules including crew, food production, air revitalization, water recovery, solid waste incineration and power. They are implemented in a consumer/producer relationship in which certain modules produce resources that are consumed by other modules. Stores hold resources between modules. Control of this simulation is via adjusting flows of resources between modules and into/out of stores. We developed adaptive algorithms that control the flow of resources in BioSim. Our learning algorithms discovered several ingenious strategies for maximizing mission length by controlling the air and water recycling systems as well as crop planting schedules. By exploiting non-linearities in the overall system dynamics, the learned controllers easily out- performed controllers written by human experts. In sum, we accomplished three goals. We (1) developed foundations for learning models of coupled dynamical systems by active exploration of the state space, (2) developed and tested algorithms that learn to efficiently control air and water recycling processes as well as crop scheduling in Biosim, and (3) developed an understanding of the role machine learning in designing control systems for

  4. Towards a new Mercator Observatory Control System

    Science.gov (United States)

    Pessemier, W.; Raskin, G.; Prins, S.; Saey, P.; Merges, F.; Padilla, J. P.; Van Winckel, H.; Waelkens, C.

    2010-07-01

    A new control system is currently being developed for the 1.2-meter Mercator Telescope at the Roque de Los Muchachos Observatory (La Palma, Spain). Formerly based on transputers, the new Mercator Observatory Control System (MOCS) consists of a small network of Linux computers complemented by a central industrial controller and an industrial real-time data communication network. Python is chosen as the high-level language to develop flexible yet powerful supervisory control and data acquisition (SCADA) software for the Linux computers. Specialized applications such as detector control, auto-guiding and middleware management are also integrated in the same Python software package. The industrial controller, on the other hand, is connected to the majority of the field devices and is targeted to run various control loops, some of which are real-time critical. Independently of the Linux distributed control system (DCS), this controller makes sure that high priority tasks such as the telescope motion, mirror support and hydrostatic bearing control are carried out in a reliable and safe way. A comparison is made between different controller technologies including a LabVIEW embedded system, a PROFINET Programmable Logic Controller (PLC) and motion controller, and an EtherCAT embedded PC (soft-PLC). As the latter is chosen as the primary platform for the lower level control, a substantial part of the software is being ported to the IEC 61131-3 standard programming languages. Additionally, obsolete hardware is gradually being replaced by standard industrial alternatives with fast EtherCAT communication. The use of Python as a scripting language allows a smooth migration to the final MOCS: finished parts of the new control system can readily be commissioned to replace the corresponding transputer units of the old control system with minimal downtime. In this contribution, we give an overview of the systems design, implementation details and the current status of the project.

  5. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    International Nuclear Information System (INIS)

    Bogdanov, A.V.; Yuzhanin, N.V.; Zolotarev, V.I.; Ezhakova, T.R.

    2017-01-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is reviewed and development of the corresponding elements of the system is described in the present paper.

  6. Cellular Decomposition Based Hybrid-Hierarchical Control Systems with Applications to Flight Management Systems

    Science.gov (United States)

    Caines, P. E.

    1999-01-01

    The work in this research project has been focused on the construction of a hierarchical hybrid control theory which is applicable to flight management systems. The motivation and underlying philosophical position for this work has been that the scale, inherent complexity and the large number of agents (aircraft) involved in an air traffic system imply that a hierarchical modelling and control methodology is required for its management and real time control. In the current work the complex discrete or continuous state space of a system with a small number of agents is aggregated in such a way that discrete (finite state machine or supervisory automaton) controlled dynamics are abstracted from the system's behaviour. High level control may then be either directly applied at this abstracted level, or, if this is in itself of significant complexity, further layers of abstractions may be created to produce a system with an acceptable degree of complexity at each level. By the nature of this construction, high level commands are necessarily realizable at lower levels in the system.

  7. Testing and Quality Assurance of the Control System During NIF Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Casavant, D; Carey, R; Cline, B; Lagin, L; Ludwigsen, P; Reddi, U; Van Arsdall, P

    2003-10-13

    The strategy used to develop the National Ignition Facility Integrated Computer Control System (NIF ICCS) calls for incremental cycles of construction and formal test to deliver nearly one million lines of code. Software releases that implement specific functionality are approved for deployment when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance and interface requirements using test procedures derived from system requirements. At this stage of the project the controls team has delivered approximately 3/4 of the planned software by performing dozens of development and test cycles within offline test facilities and followed by online tests to confirm integrated operation in the NIF. Test incidents are recorded and tracked from development to successful deployment by the verification team, with hardware and software changes approved by the appropriate change control board. Project metrics are generated by the Software Quality Assurance manager and monitored by ICCS management. Test results are summarized and reported to responsible individuals and Project managers under a work authorization and permit process that assesses risk and evaluates control system upgrade readiness. NIF is well into the first phases of its laser commissioning program to characterize and operate the first four laser beams and target systems. The integrated control system has successfully fired over 100 coordinated shots into beam diagnostics and an initial set of target diagnostics in the 10-m diameter target chamber. Extensive experience has been gained by integrating controls in prototype laboratories and in the NIF. This paper will discuss NIF's software QC and QA processes, capabilities of offline test facilities, and metrics collection.

  8. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  9. On adaptive modified projective synchronization of a supply chain management system

    Science.gov (United States)

    Tirandaz, Hamed

    2017-12-01

    In this paper, the synchronization problem of a chaotic supply chain management system is studied. A novel adaptive modified projective synchronization method is introduced to control the behaviour of the leader supply chain system by a follower chaotic system and to adjust the leader system parameters until the measurable errors of the system parameters converge to zero. The stability evaluation and convergence analysis are carried out by the Lyapanov stability theorem. The proposed synchronization and antisynchronization techniques are studied for identical supply chain chaotic systems. Finally, some numerical simulations are presented to verify the effectiveness of the theoretical discussions.

  10. Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system

    International Nuclear Information System (INIS)

    Trinh Dinh Hai; Nguyen Thanh Cuong; Huynh Ton Nghiem; Phan Quoc Minh; Nguyen Duc Tuan; Nguyen Nhi Dien

    2004-01-01

    From 1/2002 to 12/2003, we implemented successfully a project, entitled 'Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system' under the assistance of the Ministry of Science and Technology. Its main results such as Testing Apparatus based on microcontroller for all functional boards of the Control Logic System of the Reactor Control System (RCS). Technical support CD - ROM for Process Instrumentation System, software for logging automatically information from important systems of the RCS through LAN, program for failure management of Process Instrumentation System have been playing an important role for observation, operation support, maintenance of the RCS. Through this project, the implementation group has grown up rapidly. The control and instrumentation group has been provided with some modern equipment, electronic components, and materials for maintenance work and research development in the years to come. This paper presents typical results and discussions. (author)

  11. Development of Nuclear Control and Management Information Treatment System

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, J. G.; Lee, B. D.; So, D. S. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2007-07-01

    To implement obligations under the Non-Proliferation Treaty (NPT) and the bilateral agreements more effectively, we proposed a computerized system named the Nuclear Control and Management Information Treatment System (NCAMITS) as a part of the Nuclear Transparency Enhancement Project at the Korea Atomic Energy Research Institute (KAERI). The database system is designed not only to undertake the facility-level accounting for and control of nuclear material at KAERI, but also to meet the requirements of the State (National) System of Accounting and Control (SSAC). Since the NCAMITS will provide services for the facility operators as well as the safeguard information managers at KAERI, the development of the system is supposed to accommodate the end-user's convenience and the manager's sophisticated specifications as well.

  12. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  13. A survey of the use of database management systems in accelerator projects

    CERN Document Server

    Poole, John

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accelerator projects and what they are being used for. Initially introduced to handle equipment builders' data, commercial DBMS are now being used in almost all areas of accelerators from on-line control to personnel data. A variety of commercial systems are being used in conjunction with a diverse selection of application software for data maintenance/manipulation and controls. This paper reviews the database activities known to IADBG.

  14. Radiation protection system installation for the accelerator production of tritium/low energy demonstration accelerator project (APT/LEDA)

    CERN Document Server

    Wilmarth, J E; Tomei, T L

    2000-01-01

    The APT/LEDA personnel radiation protection system installation was accomplished using a flexible, modular proven system which satisfied regulatory orders, project design criteria, operational modes, and facility requirements. The goal of providing exclusion and safe access of personnel to areas where prompt radiation in the LEDA facility is produced was achieved with the installation of a DOE-approved Personnel Access Control System (PACS). To satisfy the facility configuration design, the PACS, a major component of the overall radiation safety system, conveniently provided five independent areas of personnel access control. Because of its flexibility and adaptability the Los-Alamos Neutron- Science-Center-(LANSCE)-designed Radiation Security System (RSS) was efficiently configured to provide the desired operational modes and satisfy the APT/LEDA project design criteria. The Backbone Beam Enable (BBE) system based on the LANSCE RSS provided the accelerator beam control functions with redundant, hardwired, ta...

  15. The planned replacement of a functioning control system on the CERN 28 GEV accelerator

    International Nuclear Information System (INIS)

    Carpenter, B.E.; Daneels, A.; Perriollat, F.

    1979-01-01

    The subject is discussed under the following headings: the accelerators (in the 28 GeV accelerator complex) and the old control system; goals of the new control system; constraints (involved in planning a replacement for the control system); a pilot project; major software issues in the system design; portability; parallelism; transition; conclusion. (U.K.)

  16. Control System Design for Automatic Cavity Tuning Machines

    Energy Technology Data Exchange (ETDEWEB)

    Carcagno, R.; Khabiboulline, T.; Kotelnikov, S.; Makulski, A.; Nehring, R.; Nogiec, J.; Ross, M.; Schappert, W.; /Fermilab; Goessel, A.; Iversen, J.; Klinke, D.; /DESY

    2009-05-01

    A series of four automatic tuning machines for 9-cell TESLA-type cavities are being developed and fabricated in a collaborative effort among DESY, FNAL, and KEK. These machines are intended to support high-throughput cavity fabrication for construction of large SRF-based accelerator projects. Two of these machines will be delivered to cavity vendors for the tuning of XFEL cavities. The control system for these machines must support a high level of automation adequate for industrial use by non-experts operators. This paper describes the control system hardware and software design for these machines.

  17. Control System Design for Automatic Cavity Tuning Machines

    International Nuclear Information System (INIS)

    Carcagno, R.; Khabiboulline, T.; Kotelnikov, S.; Makulski, A.; Nehring, R.; Nogiec, J.; Ross, M.; Schappert, W.; Goessel, A.; Iversen, J.; Klinke, D.

    2009-01-01

    A series of four automatic tuning machines for 9-cell TESLA-type cavities are being developed and fabricated in a collaborative effort among DESY, FNAL, and KEK. These machines are intended to support high-throughput cavity fabrication for construction of large SRF-based accelerator projects. Two of these machines will be delivered to cavity vendors for the tuning of XFEL cavities. The control system for these machines must support a high level of automation adequate for industrial use by non-experts operators. This paper describes the control system hardware and software design for these machines.

  18. Upgrade of the Los Alamos Plutonium Facility control system

    International Nuclear Information System (INIS)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-01-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed

  19. Control of Discrete-Event Systems Automata and Petri Net Perspectives

    CERN Document Server

    Silva, Manuel; Schuppen, Jan

    2013-01-01

    Control of Discrete-event Systems provides a survey of the most important topics in the discrete-event systems theory with particular focus on finite-state automata, Petri nets and max-plus algebra. Coverage ranges from introductory material on the basic notions and definitions of discrete-event systems to more recent results. Special attention is given to results on supervisory control, state estimation and fault diagnosis of both centralized and distributed/decentralized systems developed in the framework of the Distributed Supervisory Control of Large Plants (DISC) project. Later parts of the text are devoted to the study of congested systems though fluidization, an over approximation allowing a much more efficient study of observation and control problems of timed Petri nets. Finally, the max-plus algebraic approach to the analysis and control of choice-free systems is also considered. Control of Discrete-event Systems provides an introduction to discrete-event systems for readers that are not familiar wi...

  20. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  1. FBR Italian position. The PEC reactor and its control rods system

    International Nuclear Information System (INIS)

    Artioli, C.

    1984-01-01

    The greatest effort in Italy concerning Fast Breeder Reactors is concentrated on the PEC project. This project represents in fact the sole Italian work on the FBR option. Up to now the state of progress of the PEC project is as follows: - Design work on reactor components and related systems: 80% - Civil engineering work: 45% - Components construction: 18%. It has recently been stated that construction of the plant must be finished by 1987. The progressive design of the PEC control system and the supporting research and development programmes are described in this paper

  2. Distributed computer control systems in future nuclear power plants

    International Nuclear Information System (INIS)

    Yan, G.; L'Archeveque, J.V.R.; Watkins, L.M.

    1978-09-01

    Good operating experience with computer control in CANDU reactors over the last decade justifies a broadening of the role of digital electronic and computer related technologies in future plants. Functions of electronic systems in the total plant context are reappraised to help evolve an appropriate match between technology and future applications. The systems research, development and demonstration program at CRNL is described, focusing on the projects pertinent to the real-time data acquisition and process control requirements. (author)

  3. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  4. IT Security Support for Spaceport Command and Control System

    Science.gov (United States)

    McLain, Jeffrey

    2013-01-01

    During the fall 2013 semester, I worked at the Kennedy Space Center as an IT Security Intern in support of the Spaceport Command and Control System under the guidance of the IT Security Lead Engineer. Some of my responsibilities included assisting with security plan documentation collection, system hardware and software inventory, and malicious code and malware scanning. Throughout the semester, I had the opportunity to work on a wide range of security related projects. However, there are three projects in particular that stand out. The first project I completed was updating a large interactive spreadsheet that details the SANS Institutes Top 20 Critical Security Controls. My task was to add in all of the new commercial of the shelf (COTS) software listed on the SANS website that can be used to meet their Top 20 controls. In total, there are 153 unique security tools listed by SANS that meet one or more of their 20 controls. My second project was the creation of a database that will allow my mentor to keep track of the work done by the contractors that report to him in a more efficient manner by recording events as they occur throughout the quarter. Lastly, I expanded upon a security assessment of the Linux machines being used on center that I began last semester. To do this, I used a vulnerability and configuration tool that scans hosts remotely through the network and presents the user with an abundance of information detailing each machines configuration. The experience I gained from working on each of these projects has been invaluable, and I look forward to returning in the spring semester to continue working with the IT Security team.

  5. Challenges for maintaining the modernization of instrumentation and control systems

    International Nuclear Information System (INIS)

    Rojas, V.

    2014-01-01

    Instrumentation and control system upgrades in nuclear power plants come with some challenges for their maintenance staff. It is important to have a long term modernization plant that derives from specific studies for each system. Training, spares, configuration control and cybersecurity are critical topics to take into account from the beginning of these projects. New system maintenance plans can require a new approach in accordance with the technology. FPGAs (Field Programmable Gate Array) appear as the alternative for the future, mainly in safety systems. (Author)

  6. The SLC control system - status and development

    International Nuclear Information System (INIS)

    Phinney, N.; Shoaee, H.

    1987-03-01

    The SLC control system is installed and operational in the full SLC through the Linac, Damping Rings, Positron Source, Arcs and Final Focus. The system now includes a host VAX 11/785, a development VAX 11/780, 4 VAX workstations, a distributed network of 70 microprocessors, and about 270 Camac crates with more than 4000 modules. The micros are used for control and monitoring of the hardware, for pulse-to-pulse feedback, and for consoles (COWs). High level model-driven host software provides a variety of tools for beam setup, optimization, diagnosis, and stabilization. This paper will summarize the current status and projects under development

  7. Royal Military College of Canada SLOWPOKE-2 facility. Integrated regulating and instrumentation system (SIRCIS) upgrade project

    International Nuclear Information System (INIS)

    Corcoran, W.P.; Nielsen, K.S.; Kelly, D.G.; Weir, R.D.

    2013-01-01

    The SLOWPOKE-2 Facility at the Royal Military College of Canada has operated the only digitally controlled SLOWPOKE reactor since 2001 (Version 1.0). The present work describes ongoing project development to provide a robust digital reactor control system that is consistent with Aging Management as summarized in the Facility's Life Cycle Management and Maintenance Plan. The project has transitioned from a post-graduate research activity to a comprehensively managed project supported by a team of RMCC professional and technical staff who have delivered an update of the V1.1 system software and hardware implementation that is consistent with best Canadian nuclear industry practice. The challenges associated with the implementation of Version 2.0 in February 2012, the lessons learned from this implementation, and the applications of these lessons to a redesign and rewrite of the RMCC SLOWPOKE-2 digital instrumentation and regulating system (Version 3) are discussed. (author)

  8. Audit, Control and Monitoring Design Patterns (ACMDP for Autonomous Robust Systems (ARS

    Directory of Open Access Journals (Sweden)

    C. Trad

    2008-11-01

    Full Text Available This paper proposes the Audit, Control and Monitoring Design Patterns (ACMDP for building Autonomous and Robust Systems (ARS such as Mobile Robot Systems (MRS. These patterns are also applicable to other Mission Critical and Complex Systems (MCCS. This paper presents a proposal which will help ARS project managers and engineers design, build and estimate the probability that an ARS will succeed or fail. Furthermore, this proposal offers the possibility to ARS problems with the help of audit, monitoring and controlling components, adjust the project management pathways, and define the problem sources as well as their possible solutions, in order to deliver an ARS or an MRS.

  9. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  10. Transactive Control of Commercial Building HVAC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Corbin, Charles D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Makhmalbaf, Atefe [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Huang, Sen [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mendon, Vrushali V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhao, Mingjie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Somasundaram, Sriram [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Liu, Guopeng [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ngo, Hung [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Katipamula, Srinivas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    This document details the development and testing of market-based transactive controls for building heating, ventilating and air conditioning (HVAC) systems. These controls are intended to serve the purposes of reducing electricity use through conservation, reducing peak building electric demand, and providing demand flexibility to assist with power system operations. This report is the summary of the first year of work conducted under Phase 1 of the Clean Energy and Transactive Campus Project. The methods and techniques described here were first investigated in simulation, and then subsequently deployed to a physical testbed on the Pacific Northwest National Laboratory (PNNL) campus for validation. In this report, we describe the models and control algorithms we have developed, testing of the control algorithms in simulation, and deployment to a physical testbed. Results from physical experiments support previous simulation findings, and provide insights for further improvement.

  11. The elettra beam line control system

    International Nuclear Information System (INIS)

    Mignacco, M.; Abrami, A.; Dequal, Z.

    1994-01-01

    Elettra is a third generation Synchrotron Light Source located in Trieste (Italy). It consists of a full energy linac injector and a storage ring with beam energies between 1.5 and 2 GeV. The facility is scheduled to be operational by end 1993. For the whole project 22 beam lines from insertion devices are foreseen, each of them is composed of a large number of measurement and controls instruments, most of them embedded in intelligent devices; in addition each beam line can be considered unique compared to the others, having been designed to provide a different kind of synchrotron radiation. This results in a large not homogenous environment where more than 200,000 physical points have to be controlled. A joint team composed of Softeco Sismat and Digital Equipment has developed a fully automated beam line control system able to give full remote controls, with different kind of access rights, to beam line users and beam line specialists as well as a full integration with experiment control systems. ((orig.))

  12. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-01

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork

  13. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  14. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    OpenAIRE

    Macias, R.; Chavez, E.; Ortiz, M. E.; Lopez, K.; Huerta, A.; Verde, M. C.

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software fr...

  15. The development of Gallstone solvent temperature adaptive PID control system

    Institute of Scientific and Technical Information of China (English)

    MA; BING; QIAO; BO; YAN

    2012-01-01

    The paper expatiated the work principle,general project,and the control part of the corresponding program of the temperature system in the gallstone dissolving instrument.Gallstone dissolving instrument adopts automatic control solvent cycle of direct solution stone treatment,replacing the traditional external shock wave rock row stone and gallblad-der surgery method.PID control system to realize the gall stone solvent temperature intelligent control,the basic principle of work is as solvent temperature below the set temperature,the relay control heater to solvent to be heated,conversely,no heating,achieve better able to dissolve the the rapeutic effect of gallstones.

  16. Supervisory Control System Architecture for Advanced Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Cetiner, Sacit M [ORNL; Cole, Daniel L [University of Pittsburgh; Fugate, David L [ORNL; Kisner, Roger A [ORNL; Melin, Alexander M [ORNL; Muhlheim, Michael David [ORNL; Rao, Nageswara S [ORNL; Wood, Richard Thomas [ORNL

    2013-08-01

    This technical report was generated as a product of the Supervisory Control for Multi-Modular SMR Plants project within the Instrumentation, Control and Human-Machine Interface technology area under the Advanced Small Modular Reactor (SMR) Research and Development Program of the U.S. Department of Energy. The report documents the definition of strategies, functional elements, and the structural architecture of a supervisory control system for multi-modular advanced SMR (AdvSMR) plants. This research activity advances the state-of-the art by incorporating decision making into the supervisory control system architectural layers through the introduction of a tiered-plant system approach. The report provides a brief history of hierarchical functional architectures and the current state-of-the-art, describes a reference AdvSMR to show the dependencies between systems, presents a hierarchical structure for supervisory control, indicates the importance of understanding trip setpoints, applies a new theoretic approach for comparing architectures, identifies cyber security controls that should be addressed early in system design, and describes ongoing work to develop system requirements and hardware/software configurations.

  17. DEMONSTRATION OF AN ADVANCED INTEGRATED CONTROL SYSTEM FOR SIMULTANEOUS EMISSIONS REDUCTION

    Energy Technology Data Exchange (ETDEWEB)

    Suzanne Shea; Randhir Sehgal; Ilga Celmins; Andrew Maxson

    2002-02-01

    The primary objective of the project titled ''Demonstration of an Advanced Integrated Control System for Simultaneous Emissions Reduction'' was to demonstrate at proof-of-concept scale the use of an online software package, the ''Plant Environmental and Cost Optimization System'' (PECOS), to optimize the operation of coal-fired power plants by economically controlling all emissions simultaneously. It combines physical models, neural networks, and fuzzy logic control to provide both optimal least-cost boiler setpoints to the boiler operators in the control room, as well as optimal coal blending recommendations designed to reduce fuel costs and fuel-related derates. The goal of the project was to demonstrate that use of PECOS would enable coal-fired power plants to make more economic use of U.S. coals while reducing emissions.

  18. Analysis and control of issues that delay pharmaceutical projects

    Directory of Open Access Journals (Sweden)

    Nallam Sai Nandeswara Rao

    2015-10-01

    Full Text Available Every project will have certain objectives and service levels to be achieved. The success of a project depends on several dimensions like time, cost/budget, quality, etc. and managing a project involves completing the project within time, within budget and with quality to satisfy the users. Because of the significance of health, pharmaceutical companies realized the importance of project management methods and techniques to make available the life saving drugs in time to the needy patients and hospitals. In literature, there is meager information about pharmaceutical project management oriented towards analysis of issues and factors that contribute to the failure or success of projects. This study attempts to analyse different issues that contribute to time delays in pharmaceutical product-based projects, group them under a finite set of prominent factors and identify remedial measures to control those delays. The feedback of project people of some big pharmaceutical firms of Indian sub-continent was collected for this purpose. Exploratory factor analysis (EFA has been used to reduce the reasons for time delays to a limited number of prominent factors and the EFA model has been further examined by confirmatory factor analysis (CFA for its validation. Remedial measures under each factor of time delays have been gathered and a framework designed to mitigate the time delays in pharmaceutical projects. The derived factors that delay the pharmaceutical projects include resource, monitoring & control, scheduling and planning problems. Important remedial measures like blended resource approach, estimation and forecast of shortage of labour and skills, regular quality training, etc. have been recommended.

  19. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  20. Summary of developments and future projects in nuclear power plant control and instrumentation in the Netherlands

    International Nuclear Information System (INIS)

    Plas, Y. van der

    1990-01-01

    A general view is given on the developments and trends due to instrumentation and control of the two nuclear power plants in the Netherlands around the year 1989. Several projects, under which for classification of systems and components and for emergency operating procedures, are executed in both plants. An OSART mission initiated a project to make possible the periodic test of safety commands during operation. An other large project concerned the replacement of the process presentation system in Nuclear Power Plant Borssele. In the article several other developments due to the application of I and C in existing plants are outlined generally. Since 1974, no new nuclear power plants have been constructed in the Netherlands. (author). 2 figs

  1. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  2. How to Successfully Renovate a Controls System? - Lessons Learned from the Renovation of the CERN Injectors’ Controls Software

    CERN Document Server

    Kruk, G; Kulikova, O; Lezhebokov, V; Pace, M; Pera Mira, P; Roux, E; Wozniak, J Pawel

    2014-01-01

    Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the Injector Controls Architecture (InCA) project. One of its main objectives was to homogenize the controls software across CERN accelerators and reuse as much as possible the existing modern sub-systems, such as the settings management used for the LHC. The project team created a platform that would permit coexistence and intercommunication between old and new components via a dedicated gateway, allowing a progressive replacement of the former. Dealing with a heterogeneous environment, with many diverse and interconnected modules, implemented using different technologies and programming languages, the team had to introduce all the modifications in the smoothest possible way, without causing machine downtime. After a brief description of the system architecture, the paper discusses the technical and non-technical sides of the renovation process such as validation and deployment methodology, operational applicatio...

  3. Conceptual requirements for large fusion experiment control, data, robotics, and management systems

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Sullivan, J.D.

    1987-05-01

    The conceptual system requirements for the control, data, robotics, and project management (CDRM) system for the next generation of fusion experiments are developed by drawing on the success of the Tara control and data system. The requirements are described in terms of an integrated but separable matrix of well-defined interfaces among the various systems and subsystems. The study stresses modularity, performance, cost effectiveness, and exportability

  4. Advanced Instrumentation, Information and Control (II and C) Research and Development Facility Buildout and Project Execution of LWRS II and C Pilot Projects 1 and 3

    International Nuclear Information System (INIS)

    Farris, Ronald; Oxstrand, Johanna; Weatherby, Gregory

    2011-01-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II and C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II and C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results

  5. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    Science.gov (United States)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  6. ERP System Audit a Control Support For Knowledge Management

    Directory of Open Access Journals (Sweden)

    Traian SURCEL

    2008-01-01

    Full Text Available The ERP system supports most of the business system that maintains in a single database the data needed for a variety of business functions such as Manufacturing, SCM, Financials, Projects, Human Resources and CRM; the audit of this systems is necessary in order to give reasonable assurance to the company on its core system. Obtained evidence evaluation can ensure whether the organization's IT&C system safeguard assets, maintains data integrity, and is operating effectively and efficiently to achieve the organization's goals or objectives. The audit process respecting the methodology based on: gathering information and plan; obtaining an understanding of internal controls; performing test of controls and substantive tests, develop a control support on quality of flow of information and knowledge from formal perspective, for Knowledge Management in large enterprises.

  7. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  8. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  9. Managing modernization of nuclear power plant instrumentation and control systems

    International Nuclear Information System (INIS)

    2004-02-01

    There are many reasons why I and C systems need to be modernized in nuclear power plants, including obsolescence, results of aging technology, failure rates, and the need for additional functionality and improved performance. For many plants, Instrumentation and Control (I and C) modernization will be one of the largest and most important activities over the next decade or longer. Modernization of I and C systems will represent a major capital investment for the plants in the future. Therefore, good and informed management to determine what needs to be modernized, how it should be modernized, and then to do the actual modernization is essential in order to minimize the costs and maximize the benefits. While many reports have discussed I and C modernization topics, one topic that needs more work is how to management I and C modernization projects efficiently. In order to have an efficient modernization project, it is essential that the plant does strategic planning to determine what needs to be done with I and C systems in the context of the overall plant goals, objectives, and commitments. This includes determining what features the the overall I and C, and control room, of the plant should look like at the end of the time period considered by the strategic planning effort, what systems need to be modernized, what systems can be maintained, the priority order of the systems to be modernized, how the systems should be modernized, and so on. To ensure that the individual I and C and control room modernization projects are done consistently with the strategic plan and the overall plant goals, objectives, and commitments, it is important that management establishes a set of plant specific guidelines and generic requirements and processes that the project will need to follow and that can be used as part of the requirements specifications for the new systems. High level management leadership and support is needed for I and C modernization in order to maintain the high

  10. Managing modernization of nuclear power plant instrumentation and control systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-02-01

    There are many reasons why I and C systems need to be modernized in nuclear power plants, including obsolescence, results of aging technology, failure rates, and the need for additional functionality and improved performance. For many plants, Instrumentation and Control (I and C) modernization will be one of the largest and most important activities over the next decade or longer. Modernization of I and C systems will represent a major capital investment for the plants in the future. Therefore, good and informed management to determine what needs to be modernized, how it should be modernized, and then to do the actual modernization is essential in order to minimize the costs and maximize the benefits. While many reports have discussed I and C modernization topics, one topic that needs more work is how to management I and C modernization projects efficiently. In order to have an efficient modernization project, it is essential that the plant does strategic planning to determine what needs to be done with I and C systems in the context of the overall plant goals, objectives, and commitments. This includes determining what features the the overall I and C, and control room, of the plant should look like at the end of the time period considered by the strategic planning effort, what systems need to be modernized, what systems can be maintained, the priority order of the systems to be modernized, how the systems should be modernized, and so on. To ensure that the individual I and C and control room modernization projects are done consistently with the strategic plan and the overall plant goals, objectives, and commitments, it is important that management establishes a set of plant specific guidelines and generic requirements and processes that the project will need to follow and that can be used as part of the requirements specifications for the new systems. High level management leadership and support is needed for I and C modernization in order to maintain the high

  11. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  12. Control system for a heavy-ion accelerator complex K4 - K10

    International Nuclear Information System (INIS)

    Kotov, V.M.; Pose, R.

    1992-01-01

    Control systems for newly created accelerators, perhaps for the first time, may be designed almost only around international standards for communication and control techniques. This is also true for the project of a control system for the accelerator complex K4-K10 at the Joint Institute for Nuclear Research Dubna. Nevertheless, open systems architecture with construction principles being essential for modern systems of such big devices as particle accelerators leaves designers enough possibilities for solving even very sophisticated problems. (author)

  13. Communications and control for electric power systems: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kirkham, H.

    1998-04-01

    This report is a summary of some of the work done on the Communications and Control project, with particular emphasis on the achievements during the years 1986--1996. During those years, the project moved away from concern with dispersed storage and generation and its impact on power system operation (the team was responsible for studies in this area, and for making a power system simulator that included DSG), and became involved in more concrete work aimed at applying high-tech solutions to problems of power system communications and control. This report covers work done at JPL on the following topics: (1) the measurement of electric and magnetic fields, both ac and dc; (2) the use of optical power to supply low-power electronics; (3) the design of a fault-tolerant communication system designed for distribution automation; and (4) a digital phase locked loop that allows the use of low-power transmitting electronics to recreate a good-quality signal at the receiver. In a report of this kind, only the results and highlights of the work are described.

  14. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  15. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  16. Robust intelligent sliding model control using recurrent cerebellar model articulation controller for uncertain nonlinear chaotic systems

    International Nuclear Information System (INIS)

    Peng Yafu

    2009-01-01

    In this paper, a robust intelligent sliding model control (RISMC) scheme using an adaptive recurrent cerebellar model articulation controller (RCMAC) is developed for a class of uncertain nonlinear chaotic systems. This RISMC system offers a design approach to drive the state trajectory to track a desired trajectory, and it is comprised of an adaptive RCMAC and a robust controller. The adaptive RCMAC is used to mimic an ideal sliding mode control (SMC) due to unknown system dynamics, and a robust controller is designed to recover the residual approximation error for guaranteeing the stable characteristic. Moreover, the Taylor linearization technique is employed to derive the linearized model of the RCMAC. The all adaptation laws of the RISMC system are derived based on the Lyapunov stability analysis and projection algorithm, so that the stability of the system can be guaranteed. Finally, the proposed RISMC system is applied to control a Van der Pol oscillator, a Genesio chaotic system and a Chua's chaotic circuit. The effectiveness of the proposed control scheme is verified by some simulation results with unknown system dynamics and existence of external disturbance. In addition, the advantages of the proposed RISMC are indicated in comparison with a SMC system

  17. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  18. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  19. Spain: Project control. Annex 11B

    International Nuclear Information System (INIS)

    Montes Rodriguez, J.L.

    1999-01-01

    This annex deals with project control. This annex outlines the method of accounting and coding of expenses during the various phases of transition from construction to long-term suspension. In this way costs can be accurately traced and assigned appropriately. This is an essential part of managing during the suspension phase. (author)

  20. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.