WorldWideScience

Sample records for project contract number

  1. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  3. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  4. 30 CFR 881.6 - Project contract.

    Science.gov (United States)

    2010-07-01

    ... contractors or suppliers for the construction, installation, services or work to be performed. (b) Project... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a...

  5. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  6. Final Technical Report for contract number DE-FG02-05ER15670

    Energy Technology Data Exchange (ETDEWEB)

    Glazebrook, Jane [Univ. of Minnesota, Minneapolis, MN (United States)

    2016-02-29

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  7. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  8. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  9. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  10. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  11. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  12. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  13. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  14. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  15. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  16. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  17. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  18. Convergence Properties of Projection and Contraction Methods for Variational Inequality Problems

    International Nuclear Information System (INIS)

    Xiu, N.; Wang, C.; Zhang, J.

    2001-01-01

    In this paper we develop the convergence theory of a general class of projection and contraction algorithms (PC method), where an extended stepsize rule is used, for solving variational inequality (VI) problems. It is shown that, by defining a scaled projection residue, the PC method forces the sequence of the residues to zero. It is also shown that, by defining a projected function, the PC method forces the sequence of projected functions to zero. A consequence of this result is that if the PC method converges to a nondegenerate solution of the VI problem, then after a finite number of iterations, the optimal face is identified. Finally, we study local convergence behavior of the extragradient algorithm for solving the KKT system of the inequality constrained VI problem

  19. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  20. 24 CFR 983.203 - HAP contract information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  1. Number projection method

    International Nuclear Information System (INIS)

    Kaneko, K.

    1987-01-01

    A relationship between the number projection and the shell model methods is investigated in the case of a single-j shell. We can find a one-to-one correspondence between the number projected and the shell model states

  2. Improved contraction schemes for projected entangled pair states

    Energy Technology Data Exchange (ETDEWEB)

    Lubasch, Michael; Cirac, Juan Ignacio; Banuls, Mari-Carmen [Max Planck Institute of Quantum Optics, Hans-Kopfermann-Strasse 1, 85748 Garching (Germany)

    2013-07-01

    Projected Entangled Pair States (PEPS) represent the natural generalization of Matrix Product States (MPS) in higher dimensions. The strength of MPS in the numerical simulation of 1D quantum many-body systems is well established, as they are the variational class of states underlying the Density Matrix Renormalization Group and the latter is nowadays considered numerically exact for systems comprising hundreds of quantum particles. In algorithms based on MPS or PEPS, the bond dimension D of the state determines the number of variational parameters and the computational cost. While bond dimensions on the order of hundreds and thousands are feasible with MPS, standard 2D PEPS algorithms are limited to values in the range 2 to 6 due to the much worse scaling of the computational cost with D. Recently, a new algorithm based on an alternative contraction has been proposed that reduces this cost significantly. It resorts to the single-layer picture where the contraction is done in ket and bra separately. We investigate the advantages and disadvantages of this algorithm which can be understood in terms of the PEPS's boundary approximation.

  3. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  4. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  5. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  7. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  8. A Social Contract for University-Industry Collaboration: A Case of Project-Based Learning Environment

    Science.gov (United States)

    Vartiainen, Tero

    This study determines a social contract for a form of university-industry collaboration to a project-based learning environment in close collaboration with industry. The author's previous studies on moral conflicts in a project-based learning (PjBL) environment and his 5-year engagement in the PjBL environment are used as background knowledge, and John Rawls' veil of ignorance is used as a method in the contract formulation. Fair and impartial treatment of actors is strived for with the contract which constitutes of sets of obligations for each party, students, clients, and university (instructors) in the chosen project course. With the contract fair and impartial treatment of actors is strived for and the most dilemmatic moral conflicts are tried to be avoided. The forming of the social contract is evaluated, and implications for research and collaborations in practice are offered.

  9. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  10. Client’s flexibility in renovation projects with long-term DBFMO contracts

    NARCIS (Netherlands)

    Kuhlmann, M.; Blokhuis, E.G.J.; Han, Q.; Schaefer, W.F.; Yildiz, H.T.

    2009-01-01

    Construction project clients are faced with long-term commitments when opting for a DBFMO contract, the Dutch version of PFI. This way of contracting is characterized by the delivery of a full housing service to the client over a period of decades, offered by a construction consortium including

  11. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  12. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  13. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  14. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    International Nuclear Information System (INIS)

    Sinkko, K.; Ammann, M.

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  15. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  16. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  17. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  18. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  19. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  20. Flexibility in PPP contracts : Dealing with potential change in the pre-contract phase of a construction project

    NARCIS (Netherlands)

    Demirel, H.C.; Leendertse, W.L.; Volker, L.; Hertogh, M.J.C.M.

    2016-01-01

    Public Private Partnerships (PPPs) cover a range of possible relationships between public and private parties. PPP contracts are typically used in contexts of great uncertainty, such as large construction and infrastructure projects that are realized over a longer period of time. Hence, a major

  1. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Science.gov (United States)

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  2. BKP and projective Hurwitz numbers

    Science.gov (United States)

    Natanzon, Sergey M.; Orlov, Aleksandr Yu.

    2017-06-01

    We consider d-fold branched coverings of the projective plane RP^2 and show that the hypergeometric tau function of the BKP hierarchy of Kac and van de Leur is the generating function for weighted sums of the related Hurwitz numbers. In particular, we get the RP^2 analogues of the CP^1 generating functions proposed by Okounkov and by Goulden and Jackson. Other examples are Hurwitz numbers weighted by the Hall-Littlewood and by the Macdonald polynomials. We also consider integrals of tau functions which generate Hurwitz numbers related to base surfaces with arbitrary Euler characteristics sc {e}, in particular projective Hurwitz numbers sc {e}=1.

  3. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  4. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  5. Photon number projection using non-number-resolving detectors

    International Nuclear Information System (INIS)

    Rohde, Peter P; Webb, James G; Huntington, Elanor H; Ralph, Timothy C

    2007-01-01

    Number-resolving photo-detection is necessary for many quantum optics experiments, especially in the application of entangled state preparation. Several schemes have been proposed for approximating number-resolving photo-detection using non-number-resolving detectors. Such techniques include multi-port detection and time-division multiplexing. We provide a detailed analysis and comparison of different number-resolving detection schemes, with a view to creating a useful reference for experimentalists. We show that the ideal architecture for projective measurements is a function of the detector's dark count and efficiency parameters. We also describe a process for selecting an appropriate topology given actual experimental component parameters

  6. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  7. Group contractions in quantum field theory

    International Nuclear Information System (INIS)

    Concini, C. De; Vitiello, G.

    1979-01-01

    General theorems are given for SU(n) and SO(n). A projective geometry argument is also presented with disclosure of the occurrence a group contraction mechanism as a geometric consequence of spontaneous breakdown of symmetry. It is also shown that a contraction of the conformal group gives account of the number of degrees of freedom of an n-pseudoparticle system in an Euclidean SU(2) gauge invariant Yang-Mills theory, in agreement with the result obtained by algebraic geometry methods. Low-energy theorems and ordered states symmetry patterns are observable manifestations of group contractions. These results seem to support the conjecture that the transition from quantum to classical physics involves a group contraction mechanism. (author)

  8. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    Energy Technology Data Exchange (ETDEWEB)

    Sinkko, K.; Ammann, M. (eds.)

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  9. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  10. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  11. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  12. Technical note: Analysis of claims and disputes in contracts for oil and gas development projects in Iran with solutions

    Directory of Open Access Journals (Sweden)

    Fathollah Sajedi

    2017-08-01

    Full Text Available Contracts for oil and gas development projects are naturally complex, they are explained with some of maps and technical specifications. To supply the goals of contracts, it is necessary to construct by a team having owner, consulting engineer and contractor. The unique aspects of each project and team working are resulting to disagreements. It should be noted that the majority of team workers have not previously worked together. It may not be expected to forecast all project aspects in design and preparation of tender documents process. However, in some cases it will occur inconsistencies in contract documents and possibly may be disagreements on commentary of the cases which there are in the provisions of the contract. Every root of disagreement resulted in to claim and finally dispute. Lack of foresight and/or existing ambiguous texts in some provisions of contract, not being aware of components of the project to conditions and obligations and rules of contract will complex and sometimes impossible the agreement on implementation problems. Therefore, the claims will be resulted in disputes and inflict financial losses to contractors and/or owners and then the projects will not be completed. In Iran many activities have not been carried out about claims and disputes in different orientations especially in areas futures and hence, it was studied in this research. Firstly, research history was considered and the causes of claims and disputes were identified in process of different levels of oil projects construction from primary to exploitation and then a questionnaire was prepared using the comments of experts. Finally, the questionnaire was analysed by SPSS and the approved factors in creation of claims and disputes and in their roots were ranked.

  13. Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information

    International Nuclear Information System (INIS)

    Berends, Kees

    2007-01-01

    The amount of oil and gas processing capacity required to meet demand during the next 20 years is more than twice the amount realised during the last decades. Engineering and Construction contractors (ECs) play a key role in the development and implementation of Large Engineering and Construction Projects (LECPs) for these facilities. We examine the characteristics of LECPs, demand and supply of the contracting market and the strategies traditionally adopted by owners to contract out the development and implementation of these projects to ECs. We demonstrate that these traditional strategies are not longer effective, in the current 'sellers market', to mitigate the oligopolistic economic inefficiencies. As the 'overheating' of the contracting market is expected to continue for a considerable period of time, alternative contracting strategies are required. Contract theory, particularly the economics of information on LECPs, indicates how alternative contracting strategies can be used to overcome economic inefficiencies. The effective use of these alternative strategies requires increased owner involvement and their effectiveness is contingent upon owner competency and ECs acting as the owner's agent rather than its adversary. This will require an organisational and behavioural change process for both owners and ECs

  14. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  15. Approximate particle number projection in hot nuclei

    International Nuclear Information System (INIS)

    Kosov, D.S.; Vdovin, A.I.

    1995-01-01

    Heated finite systems like, e.g., hot atomic nuclei have to be described by the canonical partition function. But this is a quite difficult technical problem and, as a rule, the grand canonical partition function is used in the studies. As a result, some shortcomings of the theoretical description appear because of the thermal fluctuations of the number of particles. Moreover, in nuclei with pairing correlations the quantum number fluctuations are introduced by some approximate methods (e.g., by the standard BCS method). The exact particle number projection is very cumbersome and an approximate number projection method for T ≠ 0 basing on the formalism of thermo field dynamics is proposed. The idea of the Lipkin-Nogami method to perform any operator as a series in the number operator powers is used. The system of equations for the coefficients of this expansion is written and the solution of the system in the next approximation after the BCS one is obtained. The method which is of the 'projection after variation' type is applied to a degenerate single j-shell model. 14 refs., 1 tab

  16. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  17. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  18. Towards sustainable infrastructure development through integrated contracts : Experiences with inclusiveness in Dutch infrastructure projects

    NARCIS (Netherlands)

    Lenferink, Sander; Tillema, Taede; Arts, Jos

    Current complex society necessitates finding inclusive arrangements for delivering sustainable road infrastructure integrating design, construction and maintenance stages of the project lifecycle. In this article we investigate whether linking stages by integrated contracts can lead to more

  19. ESO Signs Largest-Ever European Industrial Contract For Ground-Based Astronomy Project ALMA

    Science.gov (United States)

    2005-12-01

    ESO, the European Organisation for Astronomical Research in the Southern Hemisphere, announced today that it has signed a contract with the consortium led by Alcatel Alenia Space and composed also of European Industrial Engineering (Italy) and MT Aerospace (Germany), to supply 25 antennas for the Atacama Large Millimeter Array (ALMA) project, along with an option for another seven antennas. The contract, worth 147 million euros, covers the design, manufacture, transport and on-site integration of the antennas. It is the largest contract ever signed in ground-based astronomy in Europe. The ALMA antennas present difficult technical challenges, since the antenna surface accuracy must be within 25 microns, the pointing accuracy within 0.6 arc seconds, and the antennas must be able to be moved between various stations on the ALMA site. This is especially remarkable since the antennas will be located outdoor in all weather conditions, without any protection. Moreover, the ALMA antennas can be pointed directly at the Sun. ALMA will have a collecting area of more than 5,600 square meters, allowing for unprecedented measurements of extremely faint objects. The signing ceremony took place on December 6, 2005 at ESO Headquarters in Garching, Germany. "This contract represents a major milestone. It allows us to move forward, together with our American and Japanese colleagues, in this very ambitious and unique project," said ESO's Director General, Dr. Catherine Cesarsky. "By building ALMA, we are giving European astronomers access to the world's leading submillimetre facility at the beginning of the next decade, thereby fulfilling Europe's desire to play a major role in this field of fundamental research." Pascale Sourisse, Chairman and CEO of Alcatel Alenia Space, said: "We would like to thank ESO for trusting us to take on this new challenge. We are bringing to the table not only our recognized expertise in antenna development, but also our long-standing experience in

  20. Global contract automation for E and P: project overview; Contrato global de automacao para E e P: visao geral do projeto

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Luiz Alberto Barbosa; Cintra, Paulo Cesar Vogel; Gaban, Allan Rodrigo Martins [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Corazza, Andre [Altus Sistemas de Automacao S.A., Sao Leopoldo, RS (Brazil)

    2012-07-01

    This paper aims to present a technical overview of Global Contract for Automation (CGA in Portuguese) for the segment of E and P (Exploration and Production) in Oil and Gas. This paper presents the theory of this type of contract showing the first contract of its kind in Brazil, ongoing for Pre-Salt FPSOs. The idea of using this contract as a reference is relate theory to practice. In the study is done an analysis of 'win-win' relationship in when performing pre-detailing and detail engineering, project development and automation directly with the manufacturer of the automation solution. The project herein includes automation and control of eight FPSOs (Float Production Storage and Offloading), to be produced in series. The system contracted in CGA consists of 12 systems and integrated sub-systems related to production process, fire and gas detection and emergency shutdown (shutdown). The eight FPSO have the same design, are replicas of a single project. The CGA has in its scope to interface simultaneously with different contractors: FEED project; hull constructor; construction and assembly of modules; integration of the FPSO and direct contracts with equipment suppliers. It will also be detail in this paper the scope of supply of subsystems equipment, pre-detail and detail engineering services, automation and control systems integration, consistency and testing of automation system and technical assistance for pre operation and operation of the FPSO. (author)

  1. Temperature-dependent particle-number projected moment of inertia

    International Nuclear Information System (INIS)

    Allal, N. H.; Fellah, M.; Benhamouda, N.; Oudih, M. R.

    2008-01-01

    Expressions of the parallel and perpendicular temperature-dependent particle-number projected nuclear moment of inertia have been established by means of a discrete projection method. They generalize that of the FTBCS method and are well adapted to numerical computation. The effects of particle-number fluctuations have been numerically studied for some even-even actinide nuclei by using the single-particle energies and eigenstates of a deformed Woods-Saxon mean field. It has been shown that the parallel moment of inertia is practically not modified by the use of the projection method. In contrast, the discrepancy between the projected and FTBCS perpendicular moment of inertia values may reach 5%. Moreover, the particle-number fluctuation effects vary not only as a function of the temperature but also as a function of the deformation for a given temperature. This is not the case for the system energy

  2. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  3. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  4. Defense Horizons. Number 79, April 2015

    Science.gov (United States)

    2015-04-01

    law , no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB...79, April 2015 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...aggression. Even more issues emerged following the downing of Malaysian Airlines Flight 17 over Ukraine in July 2014, and cross-border ar- tillery renewed

  5. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  6. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  7. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Felise, P.; Phillips, J.D.

    1994-01-01

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  8. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Felise, P.; Phillips, J.D.

    1994-10-17

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice.

  9. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  10. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  11. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  12. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  13. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  14. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  15. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  16. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  17. R and D contract management systems in the USA; Beikoku ni okeru R and D contract kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Outlined herein are the US Government's R and D contract management, which is considered to have greatly contributed to promotion of innovation in the USA. The procedures for the R and D contracts are managed through the mechanisms of the (government procurement), following the FAR (Federal Acquisition Regulations) that govern the government procurement rules. The procedural flow includes planning, public announcement of inviting the application documents, examination of the applications, negotiations, granting the fund, project management, suspension of the project and completion of the project. The audition sometimes takes several years to complete. The staff managing the individual contract is fairly specialized, and a team consisting of several professionals is responsible for each project. The substantial lifetime training systems the contract officers can receive are established. The alternative contract system encourages the applications from consortiums, and private enterprises frequently tie up with academic organizations to apply for the funds. Granting the funds to consortiums have many advantages, e.g., cost sharing and technological transfer. (NEDO)

  18. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  19. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  20. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  1. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  2. Capital budgeting under relational contracting: optimal ranking and duration criteria for schemes of concession, project-financing and public-private partnership

    OpenAIRE

    Biondi, Yuri

    2009-01-01

    International audience; Project-financing and public-private partnership schemes are joint projects of investment that are generally submitted to investment valuation criteria based on compound discounting. However, the theoretical basis of these criteria is at issue nowadays. According to recent studies on relational contracting economics and behavioral finance, joint projects of investment can be considered as special relational environments where the project's returns improve on alternativ...

  3. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  4. Legal issues in power sale contract negotiations

    International Nuclear Information System (INIS)

    Goodwin, L.M.

    1990-01-01

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is the foundation of the cogeneration industry. However, few cogeneration projects could be financed on the basis of PURPA alone. PURPA guarantees project owners the right to sell power at the purchasing utility's Avoided Cost, whatever that may be from time to time. However, the development and financing of a cogeneration project requires a secure and dependable income stream, not a mere guarantee of the right to receive the spot price for power. Accordingly, developers have found that a formal power sale contract with the purchasing utility is a prerequisite to successful project development. This paper summarizes some current issues in power sale contract negotiation, with a particular emphasis on contract terms which shift risks from the utility and its ratepayers to the developer. Many of these trends originally appeared before the advent of competitive bidding systems, but most will continue to affect power sale contracts under competitive bidding, and under IPP project development as well

  5. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  6. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  7. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  8. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  9. Fossil Energy Program report, 1 October 1976--30 September 1977. [Objectives, progress and plans for each contract or project

    Energy Technology Data Exchange (ETDEWEB)

    Dunning, H. Neal; Batchelor, James; Crim, Winfred; Furlong, Leroy; Harvie, Robert; Hunter, Juanita; Jones, William; Karnes, Anita; Ludwig, Linda; Miller, C. Lowell; Mills, G. Alex; Sacks, Stephen; Watkins, J. Wade; Watson, Coni; Weaver, Val

    1978-08-01

    This report is an integral part of the documentation system of the Fossil Energy Program of the Department of Energy. It contains descriptions of each contract and project, arranged in conformance with planning and budgetary documents. The results of contracts are reported at various intervals, depending on the type of contract, but at least annually. These reports are not listed individually in the ''Publications'' sections but are available from the National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia 22161. The Department of Energy also publishes several abstract journals: Fossil Energy Update, Energy Research Abstracts, and Energy Abstracts for Policy Analysis.

  10. An Optional Instrument for European Insurance Contract Law

    OpenAIRE

    Mandeep Lakhan; Helmut Heiss

    2010-01-01

    The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law) network, drafting a specific part of the Common Fr...

  11. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    Science.gov (United States)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  12. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  13. Performance-based contracts for road projects comparative analysis of different types

    CERN Document Server

    Gajurel, Ashish

    2014-01-01

    This book focuses on the aspects of contracting contracts, basically related to road construction and management contracts. The book presents an analytical study of Performance-Based Road Management and Maintenance (PMMR), Funktionsbauvertrag (FBV) (Function-Based Construction Contract) and Public Private Partnerships (PPP). A separate chapter is also included about the comparative study of these contract types. The book provides useful material for university libraries, construction companies and government departments of construction.

  14. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  15. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  16. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  17. Principles of European Contract Law

    DEFF Research Database (Denmark)

    Lando, Ole; Beale, Hugh

    This text provides a comprehensive guide to the principles of European contract law. They have been drawn up by an independent body of experts from each Member State of the EU, under a project supported by the European Commission and many other organizations. The principles are stated in the form...... of articles, with a detailed commentary explaining the purpose and operation of each article and its relation to the remainder. Each article also has extensive comparative notes surveying the national laws and other international provisions on the topic. "The Principles of European Contract Law Parts I &...... in developing a common European legal culture. The European Parliament has twice called for the creation of a European Civil Code. The principles of European contract law are essential steps in these projects. This text provides a comprehensive guide to the Principles of European contract law. They have been...

  18. Pacta sunt servanda versus the social role of contracts: the case of Brazilian agriculture contracts

    Directory of Open Access Journals (Sweden)

    Christiane Leles Rezende

    2012-06-01

    Full Text Available This study explores the instability created by contradictory court decisions related with contract breaches. Forward marketing contracts represent an important source of resources to finance Brazilian agriculture, however a large number of contract breaches were observed during a period of marked increase in soy prices. The study analyzed 161 judicial appeal decisions and a survey was carried with 70 farmers. The results show the difference of judges' interpretation and the existence of second order effects. The effects of court decisions were more requirements of guarantees and the reduction in the number of contracts. Those soybean farmers who did not breach their contracts have also been negatively affected by the strategic reactions of trading and processing companies. The concept of "social function of the contract" introduced in Brazilian civil code led to a higher degree of instability in contracts, raising transaction costs and motivating private economic sanctions.

  19. 24 CFR 983.202 - Purpose of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  20. 32 CFR 3.9 - Follow-on production contracts.

    Science.gov (United States)

    2010-07-01

    ...) Use competition to select parties for participation in the OT prototype agreement and evaluate the... THAN CONTRACTS, GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.9 Follow-on production contracts. (a) Authority. A competitively awarded OT agreement for a prototype project that satisfies the...

  1. Effects of the particle-number projection on the isovector pairing energy

    International Nuclear Information System (INIS)

    Allal, N.H.; Fellah, M.; Oudih, M.R.; Benhamouda, N.

    2006-01-01

    The usual neutron-proton BCS wave function is simultaneously projected on both the good neutron and proton numbers using a discrete projection operator. The projected energy of the system is deduced as a limit of rapidly convergent sequence. It is numerically studied for the N=Z nuclei of which ''experimental'' pairing gaps may be deduced from the experimental odd-even mass differences. It then appears that the particle-number fluctuation effect is even more important than in the case of pairing between like-particles. (orig.)

  2. Improving the repeatability of Motor Unit Number Index (MUNIX) by introducing additional epochs at low contraction levels.

    Science.gov (United States)

    Peng, Yun; Zhang, Yingchun

    2017-07-01

    To evaluate the repeatability of (Motor Unit Number Index) MUNIX under repeatability conditions, specify the origin of variations and provide strategies for quality control. MUNIX calculations were performed on the bicep brachii muscles of eight healthy subjects. Negative effect of suboptimal electrode positions on MUNIX accuracy was eliminated by employing the high-density surface electromyography technique. MUNIX procedures that utilized a variety of surface interferential pattern (SIP) epoch recruitment strategies (including the original MUNIX procedure, two proposed improvement strategies and their combinations) were described. For each MUNIX procedure, ten thousands of different SIP pools were constructed by randomly recruiting necessary SIP epochs from a large SIP epoch pool (3 datasets, 9 independent electromyography recordings at different contraction levels per dataset and 10 SIP epochs per recording) and implemented for MUNIX calculation. The repeatability of each MUNIX procedure was assessed by summarizing the resulting MUNIX distribution and compared to investigate the effect of SIP epoch selection strategy on repeatability performance. SIP epochs selected at lower contraction levels have a stronger influence on the repeatability of MUNIX than those selected at higher contraction levels. MUNIX under repeatability conditions follows a normal distribution and the standard deviation can be significantly reduced by introducing more epochs near the MUNIX definition line. The MUNIX technique shows an inherent variation attributable to SIP epochs at low contraction levels. It is recommended that more epochs should be sampled at these low contraction levels to improve the repeatability. The present study thoroughly documented the inherent variation of MUNIX and the causes, and offered practical solutions to improve the repeatability of MUNIX. Copyright © 2017 International Federation of Clinical Neurophysiology. Published by Elsevier B.V. All rights reserved.

  3. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  4. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  5. Radioactive waste inventories and projections

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from January 1981 through September 1982. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (25 abstracts)

  6. Governance variety in the energy service contracting market

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Katrin; Huelsmann, Friederike

    2008-07-01

    There is a surprisingly high variety of actors involved in the supply of energy service contracting arrangements. Based on an empirical record of approximately 2,500 contracting projects in the domain of space heating in Germany, the paper analyses specialisation patterns of contractors. An econometric model is used to test hypotheses derived from transaction cost economics, which contractor type should be expected for which kind of contracting project. According to our results, if physical, site and human asset specificity are high, governance modes are preferred, for which contracting represents a downward integration of business activities along the value-added chain. This includes the supply of contracting by municipal utilities. More specifically, municipal utilities occur as superior suppliers of contracting if combined heat and power is implemented, if the building served is connected to their gas grid and if it is a public building. This pattern could orient the development of contracting activities for utilities reconsidering their strategic position following the liberalisation of the electricity market. (orig.)

  7. Software Support for Industrial Controls Contract

    CERN Document Server

    Sánchez-Corral, E

    2001-01-01

    The contract covers the development and the operation and maintenance (O&M) of the monitoring and control systems used for supervising CERN's technical infrastructure. The contract involves those responsible for equipment in any current or future technical installation. We are outsourcing a complex activity which will require efforts on both preparing the specifications for new projects and setting clear definitions of tasks and procedures for O&M. It is a result-oriented contract in which performance will be continually evaluated by different methods and tools: project management plan and project follow-up, and CAMMS (Computerised Assets and Maintenance Management system). To be used effectively, this approach requires complete traceability of activities and documentation of the systems. Based on the analysis of the results measured and the shared (CERN and contractor) experience, the O&M activities will be reviewed and reorganised and operational procedures will be changed according to needs. A ...

  8. 24 CFR 983.205 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 983.205... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.205 Term of HAP contract. (a) Ten-year initial term. The PHA may enter into a HAP contract with an owner for an initial...

  9. Relationship Contracting: The South Australian Experience - A Case Study

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available The construction industry has long been accusedof poor performance. The confrontational attitudeof its members and the resultant adversarial atmosphere has been identified as a major factor responsible for this poor performance. A cultural change is required to remove these barriers and to promote optimum project outcomes. Relationship contracting is promoted as a way to support the shift from the adversarial culture to the co-operative and collaborative culture within the industry and the project team.The Adelaide Convention Centre Extensions project was the first in South Australia to be procure und r the principles of relationship contract1ng. Usmg the case study approach, this paper reviews the form of relationship contracting used in this milestone project. The paper documents the lessons learned from this project and makes recommendations that can lead to improvements for future projects.

  10. 24 CFR 891.565 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 891.565... 8 Assistance § 891.565 Term of HAP contract. The term of the HAP contract for assisted units shall be 20 years. If the project is completed in stages, the term of the HAP contract for assisted units...

  11. The advantages of cost plus award fee contracts

    Science.gov (United States)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  12. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments with the company SOURIAU (CH), for the next three years for up to 600 000 euros (954 600 Swiss francs), subject to revision for inflation from January 2007, bringing the total amount of the blanket purchase contract to a maximum amount of 1 200 000 euros (1 909 200 Swiss francs), subject to revision for inflation from January 2007. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/60/5/e

  13. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  14. Contract types - turnkey

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    Turnkey or the turnkey type of contract refers to a system of management according to which one organization accepts total responsibility for completing all parts and all phases of a project. In the case of a power project the turnkey contractor undertakes to design the plant, supply or procure and erect the equipment, build the station and put it into operation. (orig./FW) [de

  15. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  16. Effect of number of of projections on inverse radon transform based image reconstruction by using filtered back-projection for parallel beam transmission tomography

    International Nuclear Information System (INIS)

    Qureshi, S.A.; Mirza, S.M.; Arif, M.

    2007-01-01

    This paper present the effect of number of projections on inverse Radon transform (IRT) estimation using filtered back-projection (FBP) technique for parallel beam transmission tomography. The head phantom and the lung phantom have been used in this work. Various filters used in this study include Ram-Lak, Shepp-Logan, Cosin, Hamming and Hanning filters. The slices have been reconstructed by increasing the number of projections through parallel beam transmission tomography keeping the projections uniformly distributed. The Euclidean and Mean Squared errors and peak signal-to-noise ratio (PSNR) have been analyzed for their sensitiveness as functions of number of projections. It has found that image quality improves with the number of projections but at the cost of the computer time. The error has been minimized to get the best approximation of inverse Radon transform (IRT) as the number of projections is enhanced. The value of PSNR has been found to increase from 8.20 to 24.53 dB as the number of projections is raised from 5 to 180 for head phantom. (author)

  17. Solving for the particle-number-projected HFB wavefunction

    International Nuclear Information System (INIS)

    Jia, L.Y.

    2015-01-01

    Recently we proposed a particle-number-conserving theory for nuclear pairing (Jia, 2013) [19] through the generalized density matrix formalism. The relevant equations were solved for the case when each single-particle level has a distinct set of quantum numbers and could only pair with its time-reversed partner (BCS-type Hamiltonian). In this work we consider the more general situation when several single-particle levels could have the same set of quantum numbers and pairing among these levels is allowed (HFB-type Hamiltonian). The pair condensate wavefunction (the HFB wavefunction projected onto good particle number) is determined by the equations of motion for density matrix operators instead of the variation principle. The theory is tested in the simple two-level model with factorizable pairing interactions, and semi-realistic models with the zero-range delta interaction and the realistic Bonn-CD interaction

  18. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  19. Successful contracting of prevention services: fighting malnutrition in Senegal and Madagascar.

    Science.gov (United States)

    Marek, T; Diallo, I; Ndiaye, B; Rakotosalama, J

    1999-12-01

    There are very few documented large-scale successes in nutrition in Africa, and virtually no consideration of contracting for preventive services. This paper describes two successful large-scale community nutrition projects in Africa as examples of what can be done in prevention using the contracting approach in rural as well as urban areas. The two case-studies are the Secaline project in Madagascar, and the Community Nutrition Project in Senegal. The article explains what is meant by 'success' in the context of these two projects, how these results were achieved, and how certain bottlenecks were avoided. Both projects are very similar in the type of service they provide, and in combining private administration with public finance. The article illustrates that contracting out is a feasible option to be seriously considered for organizing certain prevention programmes on a large scale. There are strong indications from these projects of success in terms of reducing malnutrition, replicability and scale, and community involvement. When choosing that option, a government can tap available private local human resources through contracting out, rather than delivering those services by the public sector. However, as was done in both projects studied, consideration needs to be given to using a contract management unit for execution and monitoring, which costs 13-17% of the total project's budget. Rigorous assessments of the cost-effectiveness of contracted services are not available, but improved health outcomes, targeting of the poor, and basic cost data suggest that the programmes may well be relatively cost-effective. Although the contracting approach is not presented as the panacea to solve the malnutrition problem faced by Africa, it can certainly provide an alternative in many countries to increase coverage and quality of services.

  20. Determinants of the number of bidders in the competitive procurement of electricity supply contracts in the Japanese public sector

    International Nuclear Information System (INIS)

    Hattori, Toru

    2010-01-01

    Since the electricity retail market in Japan was partially opened to competition in 2000, many government entities have sought to solicit competing bids for the electricity supply to their office buildings or facilities, encouraging competition between the incumbents and new entrants. However, in many cases, only the incumbent utility bids for the contract and the competitive effects are limited. This paper presents a statistical analysis of bidders' participation in competitive procurement. We employ several count data regression models to explain the number of bidders other than the local electric utility. Our results suggest that the number of bidders would decrease in response to an increase in the load factor, perhaps because the new entrants are less competitive in serving customers with high load factors as they do not operate low-cost base-load power plants such as nuclear power plants; It would increase along with the voltage level and contract demand. The results also indicate that new entrants are more likely to participate in the bidding process in large city areas. (author)

  1. The North Sea contracting industry

    International Nuclear Information System (INIS)

    Wright, P.J.C.

    1996-09-01

    The North Sea Contracting Industry provides in-depth profiles of major contracting organisations including manpower, facilities, expertise, future directions and financial details. It addresses key issues such as: how will the role of operators and contractors change toward 2000 and beyond?; how will the contractor-operator relationship develop?; will the contractors take a more speculative role in projects such as leasing and contract to produce?; does the future belong to broad skilled providers or small specialised niche players, or both?; and how will rapid technological improvements affect the industry? (author)

  2. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  3. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  4. Dynamic Expansion and Contraction of cagA Copy Number in Helicobacter pylori Impact Development of Gastric Disease

    Directory of Open Access Journals (Sweden)

    Sungil Jang

    2017-02-01

    Full Text Available Infection with Helicobacter pylori is a major risk factor for development of gastric disease, including gastric cancer. Patients infected with H. pylori strains that express CagA are at even greater risk of gastric carcinoma. Given the importance of CagA, this report describes a new molecular mechanism by which the cagA copy number dynamically expands and contracts in H. pylori. Analysis of strain PMSS1 revealed a heterogeneous population in terms of numbers of cagA copies; strains carried from zero to four copies of cagA that were arranged as direct repeats within the chromosome. Each of the multiple copies of cagA was expressed and encoded functional CagA; strains with more cagA repeats exhibited higher levels of CagA expression and increased levels of delivery and phosphorylation of CagA within host cells. This concomitantly resulted in more virulent phenotypes as measured by cell elongation and interleukin-8 (IL-8 induction. Sequence analysis of the repeat region revealed three cagA homologous areas (CHAs within the cagA repeats. Of these, CHA-ud flanked each of the cagA copies and is likely important for the dynamic variation of cagA copy numbers. Analysis of a large panel of clinical isolates showed that 7.5% of H. pylori strains isolated in the United States harbored multiple cagA repeats, while none of the tested Korean isolates carried more than one copy of cagA. Finally, H. pylori strains carrying multiple cagA copies were differentially associated with gastric disease. Thus, the dynamic expansion and contraction of cagA copy numbers may serve as a novel mechanism by which H. pylori modulates gastric disease development.

  5. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  6. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  7. Anatomy of a cogeneration deal : natural gas contracts and regulatory issues

    International Nuclear Information System (INIS)

    Brett, J.T.

    1999-01-01

    The special features of gas contracts for cogeneration projects were discussed. It was recommended that a gas power purchase contract should be entered early in a project development cycle to justify requests for new pipeline facilities. Issues regarding buyer's commitments, market prices, and volumes were also discussed. In the event of failure to deliver, the contract should include provisions which would make it possible to source gas elsewhere, terminate the contract or seek damages. This paper also discussed various pricing provisions in a gas commodity contract, security of supplies, gas transportation arrangements, regulatory considerations, outstanding issues, and IMO (independent market operator) requirements

  8. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  9. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  10. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  11. Wartime Construction Project Outcomes as a Function of Contract Type

    Science.gov (United States)

    2016-07-01

    contract types has been well established. The theory of contractual incentives promulgated by Sherer (1964) established expected contractor...behaviors using a max- imization problem. The theory focuses on expected contractor behaviors in incentive contracts (cf. Federal Acquisition Regulation...Scherer, F. M. (1964). The theory of contractual incentives for cost reduction. Quarterly Journal of Economics, 78, 257–280. Tawazuh Commercial and

  12. Tokamak Fusion Test Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    Where the project's major contracts for buildings and equipment have experienced significant increases in cost, even though the contracts were for fixed prices, IG concluded that a major reason for the increases was the failure to adequately specify requirements prior to awarding the contracts. IG recommended that the Department should develop guidelines on what constitutes an adequate specification for a fixed-price contract and what controls should be placed over change orders. The Assistant Secretary for Management and Administration indicated in his comments to the draft report that an upcoming revision of the Accounting Practices and Procedures Handbook would establish controls over reallocations of construction funds to operating funds. Recommendations also propose that particular attention be given to ensuring that an agreed-upon plan and budget for completing the project is established, that a performance measurement system be implemented by the Princeton Plasma Physics Laboratory, and that improvements be made in the laboratory's Cost/Schedule Performance Report. Improvements are also needed in the quality assurance and safety programs of the Princeton Plasma Physics Laboratory. A number of recommendations from previous quality-assurance and safety reviews, performed by personnel from the Princeton Plasma Physics Laboratory and the Department of Energy, have not been implemented. Comments to the draft report also address these outstanding issues

  13. Utility Energy Services Contracts Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-08-01

    This document describes best practices in the use of Utility Energy Services Contracts. The recommendations were generated by a group of innovative energy managers in many successful projects. The topics include project financing, competition between utility franchises, and water conservation.

  14. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  15. Overview of the adjustable fixed-commitment contract

    International Nuclear Information System (INIS)

    Ankrum, G.T.

    1978-01-01

    This paper discusses a number of key decisions, made by the Administration during the past few weeks, in the area of uranium enrichment contracting. The new AFC contract will afford sufficient contract relief, taking the place of ''Open Seasons''

  16. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  17. 48 CFR 1552.237-70 - Contract publication review procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review... journal article to the Project Officer, and one copy to the Contracting Officer. (d) If the Government has... AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  18. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  19. LEGAL PRINCIPLES IN FUNCTION AND PERFORMANCE OF BOT CONTRACT

    Directory of Open Access Journals (Sweden)

    Reifon Cristabella Eventia

    2017-09-01

    Full Text Available Build, Operate and Transfer (BOT represents a long term partnership of the government and private sector. In BOT project, either the government or a private sector identifies a need for a development project. The philosophy in BOT contract begins from the increasing infrastructural needs in all areas and with a limited budget, government are required to commit the duties and functions state governance so that the concept of BOT give a solution through a partnership with the private sector. The government then gives a concession to the private sector to build the project and operate it for a fixed period years, after the period ended, the building shall be transferred to the government. Through BOT, the country is able to gain asset without government spending while maintaining a measure of regulatory control over the project. BOT permits the government to use private sector fund to finance public infrastructure development. The main issues elaborated in this article are the legal principle in the formation of BOT contract and the legal principle in the performance of BOT contract. There are two results; firstly, in the formation of a BOT contract, the principles of partnership and the principle of transparency should be emphasized. Secondly, in performance of the BOT contract, the principle of risk management and the principle of proportionality should be clearly stated in the rules and legal norms.

  20. Yucca Mountain Project bibliography, 1988--1989

    International Nuclear Information System (INIS)

    Lorenz, J.J.

    1990-11-01

    This bibliography contains information on the Yucca Mountain Project that was added to the Department of Energy's Energy Data Base from January 1988 through December 1989. This supplement also includes a new section which provides information about publications on the Energy Data Base that were not sponsored by the project but have some relevance to it. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Indexes are provided for Corporate Author, Personal Author, Subject, Contract Number, Report Number, Order Number Correlation, and Key Word in Context. All entries in the Yucca Mountain Project bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE). Technical reports on the Yucca Mountain Project are on display in special open files at participating Nevada Libraries and in the Public Document Room of the US Department of Energy, Nevada Operations Office, in Las Vegas

  1. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  2. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  3. Complete Instruction and Project Book for Contracting. A Library Cooperation Tool.

    Science.gov (United States)

    Radcliffe, Walter H.; Kemper, Robert E.

    An important tool for establishing efficient total library service is contracting, which allows a unit of government or a library to obtain the use of the resources of another library according to its specific needs. A contract can cover services to be purchased, financial arrangements, administrative responsibilities, legal considerations, and…

  4. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  5. Research on the energy-saving and revenue sharing strategy of ESCOs under the uncertainty of the value of Energy Performance Contracting Projects

    International Nuclear Information System (INIS)

    Qian, Dong; Guo, Ju’e

    2014-01-01

    Under the uncertainty of the value of Energy Performance Contracting Projects (EPCPs), this paper develops a revenue-sharing bargaining model between an Energy Service Company (ESCO) and an Energy-Using Organization (EU). Based on the model the paper analyzes the impacts of energy prices, risk-adjusted discount rates and accidents on the ESCO’s bargaining strategies. The research shows that the greater the probability of adverse circumstances is, the higher is the revenue share (of the EU), and the more disadvantageous is the ESCO’s position in the game. Furthermore, we design a forecast–commitment contract between an ESCO and an EU and analyze the optimal product’s energy savings commitment strategy of the ESCO to cope with uncertain energy savings and contract risk. The research illustrates that by introducing penalties and commitments, the contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent; when the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment, thus enhancing the strategy value of the bilateral relationship and reducing the contract risk. Finally, the policy recommendations about improving shared savings contract standard, third-party energy savings measurement and verification mechanism and arbitration mechanism of EPCs are provided. - Highlights: • We provide a method for determining the revenue-sharing bargaining strategy space in a finite bargaining game of the ESCO. • The increase of the probability of adverse circumstances will increase the revenue share (of the EU). • We design a forecast–commitment contract between an ESCO and an EU. • The forecast–commitment contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent. • When the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment

  6. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  7. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  8. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  9. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  10. Effects of Contract Delivery Method on the LEED(trademark) Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006) (CD-ROM)

    National Research Council Canada - National Science Library

    Carpenter, Deanna S

    2005-01-01

    ...: 1 CD-ROM; 4 3/4 in.; 484 KB. ABSTRACT: This research study focused on determining the effects that the two major contract delivery methods had on the LEED score of projects over the design and construction time horizon...

  11. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  12. 24 CFR 983.207 - Condition of contract units.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.207... in accordance with the HQS. The PHA may not make any HAP payment to the owner for a contract unit.... Such remedies include termination of housing assistance payments, abatement or reduction of housing...

  13. 33 CFR 211.109 - Contract of sale.

    Science.gov (United States)

    2010-07-01

    ... Navigation Project in Oklahoma, to Former Owners § 211.109 Contract of sale. Upon determination of the price... and deliver it to the applicant for acceptance. The contract of sale shall provide for the deposit of earnest money equal to twenty (20) percent of the price at which the land will be sold or the estimated...

  14. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  15. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  16. 78 FR 72572 - Operational Contract Support

    Science.gov (United States)

    2013-12-03

    ... contract support (OCS), including OCS program management, contract support integration, and integration of... integration, and the integration of DoD contractor personnel into contingency operations outside the United... significant economic impact on a substantial number of small entities. Public Law 96-511, ``Paperwork...

  17. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  18. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  19. The lifecycle approach as a driver for innovative power contracting; Der Lifecycle-Ansatz als Treiber fuer innovatives Energie-Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Gayer, Alfred [RWE Energiedienstleistungen GmbH (Germany)

    2011-07-01

    The sensible and efficient use of energy raises more and more the general awareness. The efficiency of projects will be influenced not only by the replacement of existing technology, but also mainly by the general conception of the design of decentralized energy supplies. The integration of waste heat from production-related processes as well as the use of all forms of energy such as electricity, heat, refrigeration and compressed air to meet the customer needs in a comprehensive energy plan increase the complexity and significantly the efficiencies. In the implementation of such projects the contracting is becoming increasingly important because the future gains in efficiency are taken into account directly. Contracting projects include the traditional total-cost-of-ownership approach (lifecycle approach). This approach considers the investment costs as well as the consequential costs of a project and shows how to optimize the total cost.

  20. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  1. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  2. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  3. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  4. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  5. 41 CFR 105-1.109 - Numbering.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Numbering. 105-1.109 Section 105-1.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION 1-INTRODUCTION 1.1-Regulations System § 105-1.109 Numbering. ...

  6. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  7. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  8. A comprehensive study on decreasing the kilovoltage cone-beam CT dose by reducing the projection number.

    Science.gov (United States)

    Lu, Bo; Lu, Haibin; Palta, Jatinder

    2010-05-12

    The objective of this study was to evaluate the effect of kilovoltage cone-beam computed tomography (CBCT) on registration accuracy and image qualities with a reduced number of planar projections used in volumetric imaging reconstruction. The ultimate goal is to evaluate the possibility of reducing the patient dose while maintaining registration accuracy under different projection-number schemes for various clinical sites. An Elekta Synergy Linear accelerator with an onboard CBCT system was used in this study. The quality of the Elekta XVI cone-beam three-dimensional volumetric images reconstructed with a decreasing number of projections was quantitatively evaluated by a Catphan phantom. Subsequently, we tested the registration accuracy of imaging data sets on three rigid anthropomorphic phantoms and three real patient sites under the reduced projection-number (as low as 1/6th) reconstruction of CBCT data with different rectilinear shifts and rota-tions. CBCT scan results of the Catphan phantom indicated the CBCT images got noisier when the number of projections was reduced, but their spatial resolution and uniformity were hardly affected. The maximum registration errors under the small amount transformation of the reference CT images were found to be within 0.7 mm translation and 0.3 masculine rotation. However, when the projection number was lower than one-fourth of the full set with a large amount of transformation of reference CT images, the registration could easily be trapped into local minima solutions for a nonrigid anatomy. We concluded, by using projection-number reduction strategy under conscientious care, imaging-guided localization procedure could achieve a lower patient dose without losing the registration accuracy for various clinical sites and situations. A faster scanning time is the main advantage compared to the mA decrease-based, dose-reduction method.

  9. Pairing vibrational and isospin rotational states in a particle number and isospin projected generator coordinate method

    International Nuclear Information System (INIS)

    Chen, H.T.; Muether, H.; Faessler, A.

    1978-01-01

    Pairing vibrational and isospin rotational states are described in different approximations based on particle number and isospin projected, proton-proton, neutron-neutron and proton-neutron pairing wave functions and on the generator coordinate method (GCM). The investigations are performed in models for which an exact group theoretical solution exists. It turns out that a particle number and isospin projection is essential to yield a good approximation to the ground state or isospin yrast state energies. For strong pairing correlations (pairing force constant equal to the single-particle level distance) isospin cranking (-ωTsub(x)) yields with particle number projected pairing wave function also good agreement with the exact energies. GCM wave functions generated by particle number and isospin projected BCS functions with different amounts of pairing correlations yield for the lowest T=0 and T=2 states energies which are practically indistinguishable from the exact solutions. But even the second and third lowest energies of charge-symmetric states are still very reliable. Thus it is concluded that also in realistic cases isospin rotational and pairing vibrational states may be described in the framework of the GCM method with isospin and particle number projected generating wave functions. (Auth.)

  10. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  11. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  12. Green Performance Contracting Strategy for Highway Construction Projects

    OpenAIRE

    2014-01-01

    With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway planning, delivery, and construction processes. This paper presents the current contracting pra...

  13. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  14. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Science.gov (United States)

    Hodd, Rory L; Bourke, David; Skeffington, Micheline Sheehy

    2014-01-01

    Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1) oceanic montane bryophytes and vascular plants; 2) species belonging to different montane plant communities; 3) species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need significantly

  15. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Directory of Open Access Journals (Sweden)

    Rory L Hodd

    Full Text Available Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1 oceanic montane bryophytes and vascular plants; 2 species belonging to different montane plant communities; 3 species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need

  16. Yucca Mountain Project bibliography, January--June 1988: An update: Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Tamura, A.T.; Lorenz, J.J.

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations Project was renamed the Yucca Mountain Project on August 5, 1988. This update contains information that was added to the DOE Energy Data Base during the first six months of 1988. The update is categorized by principal project participating organizations, and items are arranged in chronological order. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Previous information on this project can be found in the Nevada Nuclear Waste Storage Investigations bibliographies, DOE/TIC-3406 which covers the years 1977--1985, and DOE/OSTI-3406(Suppl.1) which covers 1986 and 1987. These bibliographies contain indexes for Corporate Author, Personal Author, Subject, Contract Number, Report Number, Order Number Correlation and Key Word in Context

  17. Artificial Intelligence Project

    Science.gov (United States)

    1990-01-01

    Symposium on Aritificial Intelligence and Software Engineering Working Notes, March 1989. Blumenthal, Brad, "An Architecture for Automating...Artificial Intelligence Project Final Technical Report ARO Contract: DAAG29-84-K-OGO Artificial Intelligence LaboratO"ry The University of Texas at...Austin N>.. ~ ~ JA 1/I 1991 n~~~ Austin, Texas 78712 ________k A,.tificial Intelligence Project i Final Technical Report ARO Contract: DAAG29-84-K-0060

  18. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  19. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  20. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  2. Poster — Thur Eve — 01: The effect of the number of projections on MTF and CNR in Compton scatter tomography

    International Nuclear Information System (INIS)

    Chighvinadze, T; Pistorius, S

    2014-01-01

    Purpose: To investigate the dependence of the reconstructed image quality on the number of projections in multi-projection Compton scatter tomography (MPCST). The conventional relationship between the projection number used for reconstruction and reconstructed image quality pertained to CT does not necessarily apply to MPCST, which can produce images from a single projection if the detectors have sufficiently high energy and spatial resolution. Methods: The electron density image was obtained using filtered-backprojection of the scatter signal over circular arcs formed using Compton equation. The behavior of the reconstructed image quality as a function of the projection number was evaluated through analytical simulations and characterized by CNR and MTF. Results: The increase of the projection number improves the contrast with this dependence being a function of fluence. The number of projections required to approach the asymptotic maximum contrast decreases as the fluence increases. Increasing projection number increases the CNR but not spatial resolution. Conclusions: For MPCST using a 500eV energy resolution and a 2×2mm 2 size detector, an adequate image quality can be obtained with a small number of projections provided the incident fluence is high enough. This is conceptually different from conventional CT where a minimum number of projections is required to obtain an adequate image quality. While increasing projection number, even for the lowest dose value, the CNR increases even though the number of photons per projection decreases. The spatial resolution of the image is improved by increasing the sampling within a projection rather than by increasing the number of projections

  3. The Weyl law for contractive maps

    Science.gov (United States)

    Spina, Maria E.; Rivas, Alejandro M. F.; Carlo, Gabriel

    2013-11-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps.

  4. The Weyl law for contractive maps

    International Nuclear Information System (INIS)

    Spina, Maria E; Rivas, Alejandro M F; Carlo, Gabriel

    2013-01-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps. (paper)

  5. Effects of particle-number-projection on nuclear moment of intertia

    International Nuclear Information System (INIS)

    Rozmej, P.

    1976-01-01

    The formalism of the moment of inertia in cranking model and BCS theory has been extended for the partially particle-number-projected BCS wave functions. The ground state moments of inertia obtained by this method are a little greater than those calculated by BCS method. A smooth growth of the moments of inertia for diminishing pairing strength constant has been obtained. (author)

  6. DETERMINANTS OF GROWTH IN FRANCHISING CONTRACTS IN EMERGING MARKETS; EVIDENCES FROM TURKEY

    Directory of Open Access Journals (Sweden)

    Sitki Sonmezer

    2012-02-01

    Full Text Available This study aims to examine the franchise sector and determine the significant factors that contribute to an increase in the number of franchiser’s contracts in Turkey. Secondary data is used from the Turkish Franchise Association and multivariate regression models are run for each sector. Our models explain the change in the number of franchise contracts with R2’s varying between .6577 and .7549. We provide evidence that success factors in increasing the number of contracts change depending on the sector firms operating in and contracts may be designed thusly to pursue success.

  7. Number names and number understanding

    DEFF Research Database (Denmark)

    Ejersbo, Lisser Rye; Misfeldt, Morten

    2014-01-01

    This paper concerns the results from the first year of a three-year research project involving the relationship between Danish number names and their corresponding digits in the canonical base 10 system. The project aims to develop a system to help the students’ understanding of the base 10 syste...... the Danish number names are more complicated than in other languages. Keywords: A research project in grade 0 and 1th in a Danish school, Base-10 system, two-digit number names, semiotic, cognitive perspectives....

  8. Simultaneous projection of particle-number and angular momentum BCS wave-functions in the rare-earth nuclei

    International Nuclear Information System (INIS)

    Oudih, M.R.; Benhamouda, N.; Fellah, M.; Allal, N.H.

    2000-01-01

    A method of simultaneous particle-number and angular-momentum projection of the BCS wave-function is presented. The particle number projection method is of FBCS type. In the frame work of the adiabatic approximation, the rotational energies of the axially symmetric even-even nuclei are established and numerically calculated for the rare-earth region. (author)

  9. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  10. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knedsen, Curtis M. (Oncorh Consulting, Olympia, WA); Schroder, Steven L. (Washington Department of Fish and Wildlife, Olympia, WA); Johnston, Mark V. (Yakama Nation, Toppenish, WA)

    2006-05-01

    This report covers three of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME) and was completed by Oncorh Consulting as a contract deliverable to the Yakama Nation and Washington Department of Fish and Wildlife. The YKFPME (Project Number 1995-063-25) is funded under two BPA contracts, one for the Yakama Nation (Contract No. 00022449) and the other for the Washington Department of Fish and Wildlife (Contract No. 22370). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME.

  11. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  12. Lessons learned : pavement marking warranty contract.

    Science.gov (United States)

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  13. River Protection Project (RPP) Immobilized Low- Ativity Waste (ILAW) Disposal Plan

    International Nuclear Information System (INIS)

    BRIGGS, M.G.

    2000-01-01

    This document replaces HNF-1517, Rev 2 which is deleted. It incorporates updates to reflect changes in programmatic direction associated with the vitrification plant contract change and associated DOE/ORP guidance. In addition it incorporates the cancellation of Project W-465, Grout Facility, and the associated modifications to Project W-520, Immobilized High-Level Waste Disposal Facility. It also includes document format changes and section number modifications consistent with CH2M HILL Hanford Group, Inc. procedures

  14. An Evaluation of the Lower Rio Grande Valley Contracts with Non-VA Providers

    National Research Council Canada - National Science Library

    Piihl, Janet

    1999-01-01

    ... (DRGs with a HCFA average length of stay of three days or less). Surprisingly, four months after the contracts were implemented actual utilization of the contracts was significantly lower than projected...

  15. Analysis of Air Force Wartime Contracted Construction Project Performance

    Science.gov (United States)

    2015-03-26

    KPIs ) identified in current literature. Chan’s meta-analysis of KPIs found that time and cost are the primary objective indicators of a successful...Smith, Currie & Hancock, 2009). 46 Key performance indicators ( KPI ) were also used as input factors to analyze differences between contracts...Chan, et al. (2002) performed a meta-analysis of KPIs , as determined by construction researchers. They found that the most predictive performance

  16. A FRAMEWORK FOR SUBCONTRACTOR INTEGRATION IN ALLIANCE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Vilasini, Nimesha

    2012-04-01

    Full Text Available Project alliancing involves the active collaboration of construction project owners and non-owner participants (designer, contractors, and suppliers to deliver projects in an atmosphere of shared responsibilities and liabilities. Alliancing connotes integration but in real practice, it fails to create a true alliance environment since only part of the value chain (owner, designer, main contractor is considered for integration. Consequently subcontractors are very often left out of the key alliance. Therefore this study identifies improvement areas to current alliance practice and suggests changes that will permit critical sub-contracting processes to be integrated into a project’s main alliance. To achieve this objective the research follows a comparative study approach. Information obtained from relevant literature is used to identify current subcontractor management practices and best practices for subcontractor integration in alliances. A case study of an alliance project is used to identify improvement areas in subcontractor management practices in an alliance environment. From these findings, the study proposes a revised alliance framework that integrates subcontractors from the early stages in alliance contracts, thus enabling the realisation of benefits accruable to projects through early contractor involvement.

  17. Integration of Multiple Contractors with Performance Type of Contracts

    International Nuclear Information System (INIS)

    BURDGE, L.F.

    2000-01-01

    The management practices, procedures, and processes that are suited to managing Management and Operation (MandO) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project

  18. Material decomposition in an arbitrary number of dimensions using noise compensating projection

    Science.gov (United States)

    O'Donnell, Thomas; Halaweish, Ahmed; Cormode, David; Cheheltani, Rabee; Fayad, Zahi A.; Mani, Venkatesh

    2017-03-01

    Purpose: Multi-energy CT (e.g., dual energy or photon counting) facilitates the identification of certain compounds via data decomposition. However, the standard approach to decomposition (i.e., solving a system of linear equations) fails if - due to noise - a pixel's vector of HU values falls outside the boundary of values describing possible pure or mixed basis materials. Typically, this is addressed by either throwing away those pixels or projecting them onto the closest point on this boundary. However, when acquiring four (or more) energy volumes, the space bounded by three (or more) materials that may be found in the human body (either naturally or through injection) can be quite small. Noise may significantly limit the number of those pixels to be included within. Therefore, projection onto the boundary becomes an important option. But, projection in higher than 3 dimensional space is not possible with standard vector algebra: the cross-product is not defined. Methods: We describe a technique which employs Clifford Algebra to perform projection in an arbitrary number of dimensions. Clifford Algebra describes a manipulation of vectors that incorporates the concepts of addition, subtraction, multiplication, and division. Thereby, vectors may be operated on like scalars forming a true algebra. Results: We tested our approach on a phantom containing inserts of calcium, gadolinium, iodine, gold nanoparticles and mixtures of pairs thereof. Images were acquired on a prototype photon counting CT scanner under a range of threshold combinations. Comparison of the accuracy of different threshold combinations versus ground truth are presented. Conclusions: Material decomposition is possible with three or more materials and four or more energy thresholds using Clifford Algebra projection to mitigate noise.

  19. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M. (Dansk Energi Analyse A/S, Frederiksberg (Denmark)); Langkilde, G.; Olesen, Bjarne W. (Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark)); Moerck, O. (Cenergia Energy Consultants, Herlev (Denmark)); Sundman, O. (DONG Energy, Copenhagen (Denmark)); Engelund Thomsen, K. (Aalborg Univ., SBi, Hoersholm (Denmark))

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  20. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M [Dansk Energi Analyse A/S, Frederiksberg (Denmark); Langkilde, G; Olesen, Bjarne W [Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark); Moerck, O [Cenergia Energy Consultants, Herlev (Denmark); Sundman, O [DONG Energy, Copenhagen (Denmark); Engelund Thomsen, K [Aalborg Univ., SBi, Hoersholm (Denmark)

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  1. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  2. Influence of sampling interval and number of projections on the quality of SR-XFMT reconstruction

    International Nuclear Information System (INIS)

    Deng Biao; Yu Xiaohan; Xu Hongjie

    2007-01-01

    Synchrotron Radiation based X-ray Fluorescent Microtomography (SR-XFMT) is a nondestructive technique for detecting elemental composition and distribution inside a specimen with high spatial resolution and sensitivity. In this paper, computer simulation of SR-XFMT experiment is performed. The influence of the sampling interval and the number of projections on the quality of SR-XFMT image reconstruction is analyzed. It is found that the sampling interval has greater effect on the quality of reconstruction than the number of projections. (authors)

  3. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  4. Information Systems Development Contracts: an exploratory study of Australian legal practitioners' and Information Systems professionals' perceptions

    Directory of Open Access Journals (Sweden)

    Phil Joyce

    2003-05-01

    Full Text Available IS professionals are primarily concerned with the development of a project to meet the goals of a client. Unfortunately, IS professional do not always pay close attention to the contract or to its management and are often unaware of the legal implications of the contracts to which they are assenting. Legal advice can be sought during pre-contractual processes to help ensure that the contract meets the expectations of all the parties. If the project does not meet stakeholder’s expectations, thus causing a contract to come into dispute, lawyers may be called in to review the contract and to seek a settlement. This paper reports an exploratory study of the differences in perceptions of IS development contracts that exist between IS professionals and legal practitioners.

  5. Assessment of uncertainties in risk analysis of chemical establishments. The ASSURANCE project. Final summary report

    DEFF Research Database (Denmark)

    Lauridsen, K.; Kozine, Igor; Markert, Frank

    2002-01-01

    and led the comparison of results in order to reveal the causes for differences between the partners' results. The results of the project point to an increased awareness of the potential uncertainties in riskanalyses and highlight a number of important sources of such uncertainties. In the hazard......This report summarises the results obtained in the ASSURANCE project (EU contract number ENV4-CT97-0627). Seven teams have performed risk analyses for the same chemical facility, an ammonia storage. The EC's Joint Research Centre at Ispra and RisøNational Laboratory co-ordinated the exercise...

  6. A report to Congress Nuclear Regulatory Research: Project descriptions for FY88

    International Nuclear Information System (INIS)

    1988-08-01

    This report has been written in response to a request of the United States Congress that the Nuclear Regulatory Commission prepare and submit to the Congress a summary description of its research projects. Commercial contracts and research efforts at the Department of Energy (DOE) laboratories are assigned a five-digit financial number (FIN). This report provides a project descriptions for each FIN number. The project descriptions are divided into five major sections called program areas. These areas are: integrity of reactor components, prevent damage to reactor cores, reactor containment safety, confirming safety of nuclear waste disposal, and resolving safety issues and developing regulations. An explanation of each program area is given in an overview at the beginning of each section

  7. Operational Contract Support: Economic Impact Evaluation and Measures of Effectiveness

    Science.gov (United States)

    2017-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES...DATES COVERED MBA professional report 4. TITLE AND SUBTITLE OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES OF EFFECTIVENESS 5...evaluation, expeditionary economics , operational contract support, measure of effectiveness 15. NUMBER OF PAGES 89 16. PRICE CODE 17. SECURITY

  8. Good Faith in European Contract Law

    NARCIS (Netherlands)

    Hondius, E.H.

    2002-01-01

    Reinhard Zimmermann and Simon Whittaker, Good Faith in European Contract Law, pp 720, ISBN 0 521 77190 0, Cambridge University Press, Cambridge 2000. This is the first publication resulting from the Trento Common Core of European Private Law project. It analyses the law relating to good faith in

  9. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  10. Radioactive waste management: a series of bibliographies. Radioactive waste inventories and projections. Supplement 1

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1986-01-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from October 1982 through December 1984. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. 31 abstracts

  11. Requirements on a B2B e-contract language

    NARCIS (Netherlands)

    Angelov, S.; Grefen, P.W.P.J.

    2005-01-01

    Electronic contracts are the instrument to govern electronic trading relationships between business parties. A number of efforts exist in both the academic and industrial worlds to define an e-contract specification language. However, these efforts lack either universality or completeness. The main

  12. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  13. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  14. 78 FR 68829 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement; Contract...

    Science.gov (United States)

    2013-11-15

    ... DFARS 252.232-7007, Limitation of Government's Obligation. DFARS subpart 232.7, Contract [[Page 68830...; Defense Federal Acquisition Regulation Supplement; Contract Financing AGENCY: Defense Acquisition... and OMB Number: Defense Federal Acquisition Regulation Supplement (DFARS) Part 232, Contract Financing...

  15. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  16. Global LNG - characteristics, clients and contracts

    International Nuclear Information System (INIS)

    Bauquis, P.R.

    1997-01-01

    Total's liquefied natural gas (LNG) holdings were described. Other topics discussed included an overview of gas consumption and internationally traded gas in 1995, a primer on the history of LNG, Japan's average import prices in 1996, Europe's border gas prices and consumption in 1995, Canada/US regional price differences in 1995 and 1996, and world gas markets and prices in 1996. The projected LNG supply and demand in Europe and Asia , especially in Japan, China and India, was also discussed. General concepts of LNG pricing, the general structure of a gas sales contract, and the different categories of LNG contracts were also reviewed. 24 figs

  17. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  18. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  19. Payment contracts in a preventive health care system: a perspective from operations management.

    Science.gov (United States)

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  20. Towards a Collaborative Open Environment of Project-Centred Learning

    DEFF Research Database (Denmark)

    Bongio, Aldo; van Bruggen, Jan; Ceri, Stefano

    Nowadays, engineering studies are characterized by high mobility of students, lecturers and workforce and by the dynamics of multinational companies where “classes” or “students’ teams” composed of persons with different competencies and backgrounds, working together in projects to solve complex ...... environment. This paper proposes a COOPER framework and shows its approaches to address the various research challenges. This work is partially supported by EU/IST FP6 STREP project COOPER (contract number IST-2005-027073).......Nowadays, engineering studies are characterized by high mobility of students, lecturers and workforce and by the dynamics of multinational companies where “classes” or “students’ teams” composed of persons with different competencies and backgrounds, working together in projects to solve complex...

  1. Current problems associated with nuclear plant construction contracts

    International Nuclear Information System (INIS)

    Albano, Raffaele.

    1977-01-01

    The expansion of nuclear electricity generating programmes has brought to the fore the problems associated with construction of this type of power plant. The paper analyses the contracts for such construction and describes the most common, the turnkey contract. The present tendency is to limit the scope of turnkey contracts to the nuclear system or simply to the reactor and this is especially common in advanced nuclear countries such as the US, Canada, Japan, UK and France, and this is also the case in Italy where the question of contracting nuclear plants is debated. In Germany the power utilities hold a large number of shares in the manufacturing industry and the turnkey contract is therefore more economically attractive. A detailed description of the contracting procedure is provided, including the suppliers' and purchasers' responsibilities, plant commissioning tests and handing over of the plant to the operator. (NEA) [fr

  2. Contract Labour (Regulation and Abolition) Act 1970 and labour market flexibility: An exploratory assessment of contract labour use in India's formal manufacturing

    OpenAIRE

    Das, Deb Kusum; Choudhury, Homagni; Singh, Jaivir

    2015-01-01

    One particularly significant piece of labour legislation in India is the Contract Labour (Regulation and Abolition) Act, 1970 (CLA,1970), which regulates labour hired by firms through the offices of a labour contractor - such labour being referred to as 'contract' labour in India. This paper seeks to examine this Act and its implication for manufacturing employment in India. While empirical evidence seems to indicate the presence of large number of 'contract' workers in the Indian manufacturi...

  3. COMPARISON OF TREND PROJECTION METHODS AND BACKPROPAGATION PROJECTIONS METHODS TREND IN PREDICTING THE NUMBER OF VICTIMS DIED IN TRAFFIC ACCIDENT IN TIMOR TENGAH REGENCY, NUSA TENGGARA

    Directory of Open Access Journals (Sweden)

    Aleksius Madu

    2016-10-01

    Full Text Available The purpose of this study is to predict the number of traffic accident victims who died in Timor Tengah Regency with Trend Projection method and Backpropagation method, and compare the two methods based on the degree of guilt and predict the number traffic accident victims in the Timor Tengah Regency for the coming year. This research was conducted in Timor Tengah Regency where data used in this study was obtained from Police Unit in Timor Tengah Regency. The data is on the number of traffic accidents in Timor Tengah Regency from 2000 – 2013, which is obtained by a quantitative analysis with Trend Projection and Backpropagation method. The results of the data analysis predicting the number of traffic accidents victims using Trend Projection method obtained the best model which is the quadratic trend model with equation Yk = 39.786 + (3.297 X + (0.13 X2. Whereas by using back propagation method, it is obtained the optimum network that consists of 2 inputs, 3 hidden screens, and 1 output. Based on the error rates obtained, Back propagation method is better than the Trend Projection method which means that the predicting accuracy with Back propagation method is the best method to predict the number of traffic accidents victims in Timor Tengah Regency. Thus obtained predicting the numbers of traffic accident victims for the next 5 years (Years 2014-2018 respectively - are 106 person, 115 person, 115 person, 119 person and 120 person.   Keywords: Trend Projection, Back propagation, Predicting.

  4. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  5. Learning Contracts in Undergraduate Courses: Impacts on Student Behaviors and Academic Performance

    Science.gov (United States)

    Frank, Timothy; Scharf, Lauren F. V

    2013-01-01

    This project studied the effect of individualized, voluntary learning contracts for 18 students who performed poorly in the first part of the semester. Contracts were hypothesized to increase commitment and motivation, and lead to changes in behaviors and course performance. Self-reported prioritization and learning-related behaviors (completion…

  6. Performance Optimization of Tensor Contraction Expressions for Many Body Methods in Quantum Chemistry

    International Nuclear Information System (INIS)

    Hartono, Albert; Lu, Qingda; Henretty, Thomas; Krishnamoorthy, Sriram; Zhang, Huaijian; Baumgartner, Gerald; Bernholdt, David E.; Nooijen, Marcel; Pitzer, Russell M.; Ramanujam, J.; Sadayappan, Ponnuswamy

    2009-01-01

    Complex tensor contraction expressions arise in accurate electronic structure models in quantum chemistry, such as the coupled cluster method. This paper addresses two complementary aspects of performance optimization of such tensor contraction expressions. Transformations using algebraic properties of commutativity and associativity can be used to significantly decrease the number of arithmetic operations required for evaluation of these expressions. The identification of common subexpressions among a set of tensor contraction expressions can result in a reduction of the total number of operations required to evaluate the tensor contractions. The first part of the paper describes an effective algorithm for operation minimization with common subexpression identification and demonstrates its effectiveness on tensor contraction expressions for coupled cluster equations. The second part of the paper highlights the importance of data layout transformation in the optimization of tensor contraction computations on modern processors. A number of considerations such as minimization of cache misses and utilization of multimedia vector instructions are discussed. A library for efficient index permutation of multi-dimensional tensors is described and experimental performance data is provided that demonstrates its effectiveness.

  7. Performance Optimization of Tensor Contraction Expressions for Many Body Methods in Quantum Chemistry

    International Nuclear Information System (INIS)

    Krishnamoorthy, Sriram; Bernholdt, David E.; Pitzer, R.M.; Sadayappan, Ponnuswamy

    2009-01-01

    Complex tensor contraction expressions arise in accurate electronic structure models in quantum chemistry, such as the coupled cluster method. This paper addresses two complementary aspects of performance optimization of such tensor contraction expressions. Transformations using algebraic properties of commutativity and associativity can be used to significantly decrease the number of arithmetic operations required for evaluation of these expressions. The identification of common subexpressions among a set of tensor contraction expressions can result in a reduction of the total number of operations required to evaluate the tensor contractions. The first part of the paper describes an effective algorithm for operation minimization with common subexpression identification and demonstrates its effectiveness on tensor contraction expressions for coupled cluster equations. The second part of the paper highlights the importance of data layout transformation in the optimization of tensor contraction computations on modern processors. A number of considerations, such as minimization of cache misses and utilization of multimedia vector instructions, are discussed. A library for efficient index permutation of multidimensional tensors is described, and experimental performance data is provided that demonstrates its effectiveness.

  8. Latent organizations in the film industry: contracts, rewards and resources

    NARCIS (Netherlands)

    Ebbers, J.J.; Wijnberg, N.M.

    2009-01-01

    The main aim of this article is to study the extent to which the project-based organization (PBO) and the latent organization determine the actual behavior of actors in a project-based industry and how this is mediated by the types of contracts and rewarding practices these organizational forms

  9. MIV Project: Executive Summary

    DEFF Research Database (Denmark)

    Ravazzotti, Mariolina T.; Jørgensen, John Leif; Neefs, Marc

    1997-01-01

    Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project.......Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project....

  10. INVESTIGATING WHAT ROMANIAN IT RECRUITERS AND EMPLOYEES VALUE WHEN THEY NEGOTIATE EMPLOYMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Anca Maria CLIPA

    2017-12-01

    Full Text Available When negotiating, people have economic as well noneconomic, subjective concerns. This study is an exploratory investigation into the objective and subjective factors influencing employment contract negotiations and the willingness to interact in future business negotiations in the case of Romanian IT employees and recruiters. The study draws on qualitative data collection and analysis methods, i.e. semi-structured interviews with 10 participants, projective techniques and content analysis. At the time, 5 of the participants held recruitment and contracting HR roles, and 5 were working as employees (programmers, business analysts, IT project managers. They all had a recent working contract negotiation experience (less than one year ago in the IT industry. Using the principles of corpus linguistics and the methods specific to discourse and critical discourse analysis, our study highlights some of the factors taken into account by Romanian IT employees and recruiters in employment contract negotiations.

  11. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  12. Repowering analysis: Hanford Generating Project (HGP), Task Order Number 6

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Generating Project (HGP), owned by the Washington Public Power Supply System, consists of two low pressure steam turbines, generators, and associated equipment located adjacent to the Department of Energy's (DOE) N-Reactor. HGP has been able to produce approximately 800 MWe with low pressure steam supplied by N-Reactor. DOE has placed N-Reactor in cold standby status for an undetermined length of time. This results in the idling of the HGP since no alternative source of steam is available. Bonneville Power Administration contracted with Fluor Daniel, Inc. to investigate the feasibility and cost of constructing a new source of steam for (repowering) one of the HGP turbines. The steam turbine is currently operated with 135 psia steam. The turbines can be rebuilt to operate with 500 psia steam pressure by adding additional stages, buckets, nozzles, and diaphragms. Because of the low pressure design, this turbine can never achieve the efficiencies possible in new high pressure turbines by the presences of existing equipment reduces the capital cost of a new generating resource. Five repowering options were investigated in this study. Three cases utilizing gas turbine combined cycle steam generation equipment, one case utilizing a gas fired boiler, and a case utilizing a coal fired boiler. This report presents Fluor Daniel's analysis of these repowering options

  13. Agent-Based Simulations for Project Management

    Science.gov (United States)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  14. Simultaneous projection of particle-number and angular momentum BCS wave-functions in the rare-earth nuclei

    International Nuclear Information System (INIS)

    Oudih, M.R.; Fellah, M.; Allal, N.H.; Benhamouda, N.

    1999-01-01

    It is well established that the BCS wave-functions are neither eigen-functions of the particle-number operator nor of the angular momentum operator. In a previous paper, we have developed a particle-number projection before variation method (of FBCS type). This discrete projection method is based on the SBCS wave-function. The aim of the present contribution is to perform a subsequent angular momentum projection by means of the Peierls-Yoccoz method. The general expression of the system energy, after the double projection, is established in the case of axial symmetry. For practical calculations, an approximation method is introduced. It leads to a semi-classical form of the rotational energy. The rotational spectra have been evaluated numerically for some even-even rare-earth nuclei. The single-particle energies and eigen-states are those of a deformed Woods-Saxon mean field. The obtained results are compared on one hand, to the experimental data, and on the other hand, to the theoretical spectra evaluated by a particle-number projection after variation method (of PBCS type). For all studied nuclei, the spectra determined by the FBCS method reproduce the experimental data better than those of the PBCS method. However, even if the present method is satisfying for low angular momenta, the agreement with the experimental data is lesser for I ≥ 8, particularly for the lighter studied nuclei. (authors)

  15. Project management best practices: forging win-win partnerships

    International Nuclear Information System (INIS)

    Livet, B.

    2006-01-01

    This paper reviews various aspects of management of renewable energy projects. It outlines contracting strategies, major cost impacts on balance of plants construction and permitting a wind farm project. It concludes by recommending a careful evaluation of the contracting strategy which best fits the circumstances, consideration of site and balance of plant issues in developing a realistic cost model for the project and making an early contact with authorities to ascertain the permitting required for the project

  16. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  17. 49 CFR 633.11 - Covered projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the...

  18. Informal Progress Report Contract Number: DE-FG03-02NA00074/A000

    International Nuclear Information System (INIS)

    Brune, Carl R.; Grimes, Steven M.

    2003-01-01

    OAK B127 We report on work performed under contract DE-FG03-03NA00074 since January 1,2003. The research is in the area of low energy nuclear reactions and nuclear structure. The progress on research on level densities and improvement to R-Matrix calculations are presented. The preparations to begin high resolution experiments on p-shell nuclei are reviewed

  19. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  20. CONTRACTING OF FOREIGNERS DURING LAUNCHING THE PROJECT OF COLONISTS’RESETTLEMENT TO RUSSIA (1760s

    Directory of Open Access Journals (Sweden)

    О К Ермакова

    2017-12-01

    Full Text Available The article presents a comparative analysis of different kinds of contracts concluded du-ring the resettlement of foreign colonists to Russia in the 1760s. The agreements are classi-fi ed and characterized in terms of form, structure of content and composition of counterparts. The content of the contracts is correlated with the legislative norms as well as with other sourc-es, which infl uenced the creation of such a kind of document. The paper studies the agreements with different subcategories of foreign colonists: manufacturers, recruiters (“vyzyvateli”, plowmen. The author demonstrates the process of the rights and obligations establishment in the contracts as well as how the working-out and discussion of conditions were conducted, fi nally - in what degree the foreigners could infl uence the results. If, for example, the foreign specialists, who were hired to the Russian service temporarily, had more chances to change and improve the terms of contracts, in the case of foreign colonists, the latter ones more often just had to accept the conditions offered by the government. The author concludes that the agreements with manufacturers in many ways were similar to those with hired foreign specialists; contracts with “vyzyvateli” were the most unifi ed and, with rare exceptions, strictly corre-sponded to the form determined by the law. The paper reveals the specifi cs of the content of contracts, in particular, chapters concern-ing the subject of agreement (the main task of a foreigner was to cultivate land, to organize a factory or to attract colonists-farmers, obligation of transferring knowledge and experience to Russian pupils, fi nancial issues, conditions of trade, possibilities of leaving Russia and ac-tions in the case of foreigner’s death.The author shows the involvement of agreements with colonists in the general develop-ment of contractual relationships between the state and foreigners as members of the Russian

  1. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  2. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  3. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  4. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  5. Research projects in radiobiology and radiation protection

    International Nuclear Information System (INIS)

    1960-01-01

    Of the research projects sponsored by the International Atomic Energy Agency quite a large number are concerned with the biological effects of ionizing radiation. That itself, of course, is a very wide field covering such subjects as the nature and mechanism of radiation damage, genetic mutations, the varying radiosensitivity of different organisms, ways of modifying the natural sensitivity or resistance, and biological and chemical means of protection. In all these branches of enquiry, the Agency has awarded research contracts to scientific institutes or laboratories in different countries

  6. Research projects in radiobiology and radiation protection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-15

    Of the research projects sponsored by the International Atomic Energy Agency quite a large number are concerned with the biological effects of ionizing radiation. That itself, of course, is a very wide field covering such subjects as the nature and mechanism of radiation damage, genetic mutations, the varying radiosensitivity of different organisms, ways of modifying the natural sensitivity or resistance, and biological and chemical means of protection. In all these branches of enquiry, the Agency has awarded research contracts to scientific institutes or laboratories in different countries

  7. The Danish Contracting System

    DEFF Research Database (Denmark)

    Bonke, Sten; Levring, Peter

    The paper is mainly concerned with the institutional framework of the Danish construction industry, describing structures, rules and actors' roles within a perspective of nationally defined procedural guidelines on construction projects. These aspects are treated under the concept of a "contracting...... system". After a short introduction to the structure and activities of the industry the post-war development is reviewed, in particular emphasising the importance of the early industrialisation process which in an international perspective represents quite unique features. Furthermore the most recent...

  8. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  9. Choreographies and Behavioural Contracts on the Way to Dynamic Updates

    Directory of Open Access Journals (Sweden)

    Mario Bravetti

    2014-11-01

    Full Text Available We survey our work on choreographies and behavioural contracts in multiparty interactions. In particular theories of behavioural contracts are presented which enable reasoning about correct service composition (contract compliance and service substitutability (contract refinement preorder under different assumptions concerning service communication: synchronous address or name based communication with patient non-preemptable or impatient invocations, or asynchronous communication. Correspondingly relations between behavioural contracts and choreographic descriptions are considered, where a contract for each communicating party is, e.g., derived by projection. The considered relations are induced as the maximal preoders which preserve contract compliance and global traces: we show maximality to hold (permitting services to be discovered/substituted independently for each party when contract refinement preorders with all the above asymmetric communication means are considered and, instead, not to hold if the standard symmetric CCS/pi-calculus communication is considered (or when directly relating choreographies to behavioral contracts via a preorder, no matter the communication mean. The obtained maximal preorders are then characterized in terms of a new form of testing, called compliance testing, where not only tests must succeed but also the system under test (thus relating to controllability theory, and compared with classical preorders such as may/must testing, trace inclusion, etc. Finally, recent work about adaptable choreographies and behavioural contracts is presented, where the theory above is extended to update mechanisms allowing choreographies/contracts to be modified at run-time by internal (self-adaptation or external intervention.

  10. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  11. Recognition For Index Option Contracts U nder IAS 39 And IFRS 9 – The Case Of Option Contracts Bound To BIST 30 Index

    Directory of Open Access Journals (Sweden)

    Nevran Karaca

    2014-09-01

    Full Text Available There is a limited number of academic studies about accoun ting for derivative products but non of them relating to the accounting for index option contracts. Within the scope of the study, it is aimed to indicate accounting regulations and procedures to be followed under IAS 39 and IFRS 9 for option contracts whi ch traded in Futures and Options Exchange. The BIST 30 index option contracts having the highest volume of transaction and traded in VIOP is the main subject of the study via this objective. It is aimed to make the issue explicit by the help of a fictional ized example about these contracts.

  12. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  13. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  14. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  15. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  16. A Collection of JPME Operational Contract Support Case Studies and Vignettes

    Science.gov (United States)

    2016-12-01

    Contracting for goods and services in the contingency operational environment is a mission-enabling necessity; however, analyzing the strategic effects...choosing to contract for goods or services are largely ignored. This project explores the use of OCS in contingency environments, and the positive and...think of the costs literally, as tax dollars spent to enhance mission effectiveness. However, the less literal costs and the associated effects of

  17. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  18. Role of participants in nuclear power projects

    International Nuclear Information System (INIS)

    Polliart, A.J.

    1977-01-01

    In this article staffing requirements for nuclear projects (Turnkey Contract) and the owner's staff requirements, project planning, project implementation, and plant construction and commissioning are treated. (HK) [de

  19. Contract on using computer resources of another

    Directory of Open Access Journals (Sweden)

    Cvetković Mihajlo

    2016-01-01

    Full Text Available Contractual relations involving the use of another's property are quite common. Yet, the use of computer resources of others over the Internet and legal transactions arising thereof certainly diverge from the traditional framework embodied in the special part of contract law dealing with this issue. Modern performance concepts (such as: infrastructure, software or platform as high-tech services are highly unlikely to be described by the terminology derived from Roman law. The overwhelming novelty of high-tech services obscures the disadvantageous position of contracting parties. In most cases, service providers are global multinational companies which tend to secure their own unjustified privileges and gain by providing lengthy and intricate contracts, often comprising a number of legal documents. General terms and conditions in these service provision contracts are further complicated by the '.service level agreement', rules of conduct and (nonconfidentiality guarantees. Without giving the issue a second thought, users easily accept the pre-fabricated offer without reservations, unaware that such a pseudo-gratuitous contract actually conceals a highly lucrative and mutually binding agreement. The author examines the extent to which the legal provisions governing sale of goods and services, lease, loan and commodatum may apply to 'cloud computing' contracts, and analyses the scope and advantages of contractual consumer protection, as a relatively new area in contract law. The termination of a service contract between the provider and the user features specific post-contractual obligations which are inherent to an online environment.

  20. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    Directory of Open Access Journals (Sweden)

    Jesper Rohr Hansen

    2013-05-01

    Full Text Available This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings, and to make them more energy efficient. At the moment 30 municipalities (of the 98 municipalities in Denmark are involved in, or preparing, ESCO contracts. Nevertheless, ESCO-contracting still faces many challenges on the Danish market, as there is a widespread skepticism towards the concept amongst many stakeholders. The purpose of this paper is to discuss the various experience gained so far by municipalities use of ESCO-contracting, the different approached to ESCO-contracting being used in practice, as well as the different viewpoints drivers and barriers behind the development. The strong growth in ESCO-contracts reflects that the ESCO-concept fits well with a number of present problems that municipalities are facing, as well as a flexible adaptation to the local context in different municipalities.

  1. Network meta-analyses performed by contracting companies and commissioned by industry

    NARCIS (Netherlands)

    Schuit, Ewoud; Ioannidis, John P A

    2016-01-01

    Background: Industry commissions contracting companies to perform network meta-analysis for health technology assessment (HTA) and reimbursement submissions. Our objective was to estimate the number of network meta-analyses performed by consulting companies contracted by industry, to assess whether

  2. Debt Contracts, Collapse and Regulation as Competition Phenomena

    NARCIS (Netherlands)

    Gersbach, H.; Uhlig, H.F.H.V.S.

    1998-01-01

    We study a credit market with adverse selection and moral hazard where sufficient sorting is impossible. The crucial novel feature is the competition between lenders in their choice of contracts offered. Qualities of investment projects are not observable by banks and investment decisions of

  3. Full Lambek Calculus with Contraction is Undecidable

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel; Horčík, Rostislav

    2016-01-01

    Roč. 81, č. 2 (2016), s. 524-540 ISSN 0022-4812 R&D Projects: GA ČR GAP202/11/1632 Institutional support: RVO:67985807 Keywords : substructural logic * full Lambek calculus * contraction rule * square-increasing residuated lattice * equational theory * decidability Subject RIV: BA - General Mathematics Impact factor: 0.511, year: 2016

  4. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  5. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  6. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  7. Smart Contract Templates: essential requirements and design options

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    Smart Contract Templates support legally-enforceable smart contracts, using operational parameters to connect legal agreements to standardised code. In this paper, we explore the design landscape of potential formats for storage and transmission of smart legal agreements. We identify essential requirements and describe a number of key design options, from which we envisage future development of standardised formats for defining and manipulating smart legal agreements. This provides a prelimin...

  8. Natural gas contracts in an emerging competitive market

    International Nuclear Information System (INIS)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs

  9. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-11-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  10. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  11. Incorporating Non-energy Benefits into Energy Savings Performance Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter; Goldman, Charles; Gilligan, Donald; Singer, Terry

    2012-06-01

    This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

  12. Project Solo; Newsletter Number Twenty.

    Science.gov (United States)

    Pittsburgh Univ., PA. Project Solo.

    Three Project Solo modules are presented. They are designed to teach the concepts of elementary matrix operation, matrix multiplication, and finite-state automata. Together with the module on communication matrices from Newsletter #17 they form a well motivated but structured path to expertise in this area. (JY)

  13. 24 CFR 236.755 - Housing owner's obligation under contract to report tenant income increase.

    Science.gov (United States)

    2010-04-01

    ... FOR RENTAL PROJECTS Rental Assistance Payments § 236.755 Housing owner's obligation under contract to... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Housing owner's obligation under contract to report tenant income increase. 236.755 Section 236.755 Housing and Urban Development...

  14. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  15. Getting added value from the supply contract

    International Nuclear Information System (INIS)

    Heslop, Peter

    1999-01-01

    The linking of energy saving measures with the competitive supply of energy is examined, and the impact of digital metering on the electricity market, the roles of energy surveys and monitoring and targeting, and the unwillingness to invest in energy efficiency are discussed. Combined heat and power projects, and energy supply contracts are considered. (uk)

  16. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2002

    International Nuclear Information System (INIS)

    2003-08-01

    and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 1003 contracts and agreements were awarded from the 1364 contract and agreement proposals received by the Agency during 2002. Annex I lists by country the number of proposals received and awards made. In 2002, $6 329 221 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $122 077 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6 451 298. Table 1 summarizes all awards by Programme in 2002. The average award per contract was $5 700

  17. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-15

    and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 1003 contracts and agreements were awarded from the 1364 contract and agreement proposals received by the Agency during 2002. Annex I lists by country the number of proposals received and awards made. In 2002, $6 329 221 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $122 077 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6 451 298. Table 1 summarizes all awards by Programme in 2002. The average award per contract was $5 700.

  18. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  19. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  20. Interpretation of Written Contracts in England

    Directory of Open Access Journals (Sweden)

    Neil Andrews

    2014-01-01

    Full Text Available This article examines the leading principles governing interpretation of written contracts under English law. This is a comprehensive and incisive analysis of the current law and of the relevant doctrines, including the equitable principles of rectification, as well as the powers of appeal courts or of the High Court when hearing an appeal from an arbitral award. The topic of interpretation of written contracts is fast-moving. It is of fundamental importance because this is the most significant commercial focus for dispute and because of the number of cross-border transactions to which English law is expressly applied by businesses.

  1. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  2. [Characteristics of beneficiaries of a GP-centred health care contract in Germany].

    Science.gov (United States)

    Freund, Tobias; Szecsenyi, Joachim; Ose, Dominik

    2010-11-01

    Since 2004, primary care in Germany has increasingly been provided in special general practitioner (GP)-centred health care contracts (HZV). To date there is limited evidence about the characteristics of their beneficiaries regarding morbidity burden and health care utilization. We analysed insurance claims data from all beneficiaries of the "Allgemeine Ortskrankenkasse (AOK) Baden-Württemberg" listed in 10 general practices that contracted in a special GP-centred health care contract (HZV). We compared beneficiaries enrolled in the HZV with those who were not enrolled in the contract. Comparisons included the number of hospital admissions in 2007-2008 and the Charlson comorbidity index. Insurance claims data of 6,026 beneficiaries were available for analysis. In the third quarter of 2009, 51% (3,066) of the beneficiaries were enrolled in the HZV. They were significantly older (mean 61 years [SD 18 years] vs. 49 years [SD 22 years]; p contract tended to be older and suffered from a higher morbidity burden when compared with beneficiaries of the same health care fund who were not enrolled in the contract. Besides, beneficiaries of the contract had higher numbers of hospital admissions during the two year period before enrolment. These findings have substantial implications for individualized care management approaches that may be offered to beneficiaries of GP-centred health care contracts.

  3. Genesis of multipeaked waves of the esophagus: repetitive contractions or motion artifact?

    Science.gov (United States)

    Sampath, Neha J; Bhargava, Valmik; Mittal, Ravinder K

    2010-06-01

    Multipeaked waves (MPW) in the distal esophagus occur frequently in patients with esophageal spastic motor disorders and diabetes mellitus and are thought to represent repetitive esophageal contractions. We aimed to investigate whether the relative motion between a stationary pressure sensor and contracted peristaltic esophageal segment that moves with respiration leads to the formation of MPW. We mathematically modeled the effect of relative movement between a moving pressure segment and a fixed pressure sensor on the pressure waveform morphology. We conducted retrospective analysis of 100 swallow-induced esophageal contractions in 10 patients, who demonstrated >30% MPW on high-resolution manometry (HRM) during standardized swallows. Finally, using HRM, we determined the effects of suspended breathing and hyperventilation on the waveform morphology in 10 patients prospectively. Modeling revealed that relative movement between a stationary pressure sensor and a moving contracted segment, contraction duration, contraction amplitude, respiratory frequency, and depth of respiration affects the waveform morphology. Retrospective analysis demonstrated a close temporal association with the onset of second and subsequent contractions in MPW with respiratory phase reversals. Numbers of peaks in MPW and respiratory phase reversals were closely related to the duration of contraction. In the prospective study, suspended breathing and hyperventilation resulted in a significant decrease and increase in the MPW frequency as well as the number of peaks within MPW respectively. We conclude that MPW observed during clinical motility studies are not indicative of repetitive esophageal contraction; rather they represent respiration-related movement of the contracted esophageal segment in relation to the stationary pressure sensor.

  4. 5 CFR 1315.14 - Payments under construction contracts.

    Science.gov (United States)

    2010-01-01

    ... the contract; (ii) Payments to subcontractors and suppliers have been made from previous payments... withhold or retain from a subcontractor or supplier, in accordance with the terms and conditions of their..., increments, or segments of any project) that is approved as payable by the agency pursuant to paragraph (b...

  5. 公共项目伙伴合作契约的治理机制与责任主体找寻%Governance Mechanism of Public Projects Partnership Contract and Obligation Principal Persuing

    Institute of Scientific and Technical Information of China (English)

    后小仙

    2011-01-01

    在公共项目代建模式下,形成了一条以代理人为纽带的委托代理链。代理人问题的存在会影响公共项目管理效率,解决问题的关键在于设计一套激励相容的契约。对基于伙伴合作契约的公共项目内部治理机制的研究表明,伙伴合作契约将有效均衡合作各方内部的权利和义务,通过有限介入管理和决策,减少交易的不确定性和信息的不对称性;伙伴合作契约中的风险分担机制、利益分配机制、信任沟通机制以及冲突协调机制等是提高公共项目内部治理效率的基础和保障。%Under the agent construction system of public project,there is an agents chain which takes the agent units as the link. The problem of agency brings about the low efficiency of the public projects management. The key of the solving way lies in designing an incentive compatible contract. The analysis on the inner governance mechanisms of public projects based on the partnership contract, shows that partnership contract will effectively balance the rights and obligations of cooperation parties. Significantly reduce the uncertainty and information asymmetry of transaction by management and decision of limited intervention. The mechanisms of risk-sharing, benefits distribution, trust communication and conflict coordination in the partnership contract is the foundation to improve the efficiency of public projects Inner governance.

  6. A Liquid work-life under public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Christian

    for staff, however, are only poorly understood in current theory and research on public service contracting through partial concepts and a tendency to focus merely on negative outcomes. Against this shortfall, the aim in this paper is to build a conceptually and empirically richer and more authentic account......A part of the reality behind public service contracting in Denmark as well as in many other countries is that a growing number of people are employed in uncertain and temporary conditions and relations in what can be characterized as ‘liquidized’ work-lives. This reality and its consequences...... of staffs’ work-life under public service contracting. The paper relies empirically on focus group interviews in two cases of staff transfers in public service contracting with different levels of liquefaction. it is found that staff transfer is a composite experience for staff with differential outcomes...

  7. Financing of wind energy projects

    International Nuclear Information System (INIS)

    Harland, S.

    1991-01-01

    This paper looks at what banks need to know to enable them to consider a wind energy project. The major experiences of banks in financing wind energy have been in the US where governmentally inspired long term sales contracts (PURPA Contracts) have given a security to sponsors and banks not available elsewhere. (Author)

  8. Long-term allocation of power from the Snettisham Project

    International Nuclear Information System (INIS)

    1993-01-01

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan

  9. Behavioural contracting as a tool to help patients achieve better health.

    Science.gov (United States)

    Neale, A V

    1991-12-01

    Behavioural contracting is an intervention technique in which a client signs an agreement to make certain behaviour changes within a specified time, usually with explicitly defined rewards for adherence or success. Contracting is being increasingly used by health professionals to assist patients in making beneficial life style changes. This paper presents data on the outcome of behavioural contracting interventions to lower serum cholesterol and to increase exercise activity. Of 223 primary care patients enrolled in a health promotion programme, 179 met with the project health educator to improve their cardiovascular risk profile; 144 of these were classified as having 'high cholesterol' and 51 signed contracts to adopt the American Heart Association guidelines diet within a 3-month period. Everyone was encouraged to sign a contract to engage in aerobic exercise three times per week; 96 did so. The results indicate that contractors achieved greater beneficial health changes than non-contractors, and that the group which fully met their contract obligations experienced the greatest health benefit of all (either a lowering of cholesterol or a decreased exercising heart rate).

  10. Neutron-Induced Fission Cross Section of Uranium, Americium and Curium Isotopes. Progress report - Research Contract 14485, Coordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Alekseev, A.A.; Bergman, A.A.; Berlev, A.I.; Koptelov, E.A.; Samylin, B.F.; Trufanov, A.M.; Fursov, B.I.; Shorin, V.S.

    2009-12-01

    This report contains brief description of the Lead Slowing Down Spectrometer and results of measurements of neutron-induced fission cross sections for 236 U, 242m Am, 243 Cm, 244 Cm, 245 Cm and 246 Cm done at this spectrometer. The work was partially supported through the IAEA research contract RC-14485-RD in the framework of the IAEA Coordinated Research Project 'Minor Actinide Neutron Reaction Data (MANREAD)'. The detailed description of the experimental set up, measurements procedure and data treatment can be found in the JIA-1182 (2007) and JIA-1212 (2009) reports from the Institute of Nuclear Research of the Russian Academy of Science published in Russian. Part 1 contains the first year report of the research contract and part 2 the second year report. (author)

  11. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  12. Testing and Commissioning of Lillgrund Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Poul Erik; Larsson, Aake; Jeppsson, Joakim; Toernkvist, Mattias (ed.) (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-04-15

    This report gives an overview of the tests carried out in the Lillgrund project. The report covers factory tests, site tests and the performance tests, which can be carried out during the defects liability period. The report describes tests relevant for the wind turbine generators, the electrical system and the foundations. On the whole, the Lillgrund test results have been satisfactory. One of the more problematic issues experienced were when the foundation interface verification showed that the bolts were not meeting the height requirements. Since this shortcoming was detected relatively early in the project life, it was possible to correct the misalignment and keep the additional costs to a minimum. From a management point of view, this highlighted the importance of clear and unambiguous interface specifications and to make sure that the project has a proper interface management function. According to the Contract, Vattenfall has the right to verify a number of performance parameters during the 5-year defect liability period. The performance tests include availability, power curve, electrical system losses and acoustic noise levels. The contract specifies the test criteria, the test methods and procedures and the penalty if the tests result in undesirable levels. In some cases, there is a financial incentive for the supplier if the tests show that the wind farm is performing better than stipulated in the contract. Lillgrund has performed very well thus far and Vattenfall has determined that the contractual performance requirements are being met. Vattenfall has, therefore, not requested to carry out any of these elective Performance Tests

  13. Stimulation of Research in Biomedicine. Role of Effective Contract.

    Science.gov (United States)

    Aleksandrova, N V; Shkolnikova, M A; Dlin, V V; Yugay, M T

    Analysis of publication activity in the field of biomedicine shows insignificant input of Russia in the world scientific product. This is largely due to the lack of incentives for researchers. Article describes stimulation of researchers in Russia, compares it with foreign models, formulates main shortcomings of support and stimulation of research in Russia and introduces the concept of effective contract. Development of personnel motivation and stimulation of employees of scientific and research organizations in the field of health. As a successful experience the article describes the implementation of effective contract in Veltishev Research and Clinical Institute for Pediatrics where for years remuneration of researchers depended upon their positions without consideration of research results. Effective contract brought significant changes in the traditional system setting new performance and efficiency criteria. New evaluation system took into account publication activity, presentation activity, implementation of research results, raising scientific personnel, thesis work and income-generating activities. Introduction of effective contract already in the second year led to a rise in the number of foreign publications, publications in journals with impact factor of more than 2, the general increase in the number of articles in peer-reviewed journals with impact factor more than 0.3, the growth of the number of articles by 1 researcher, Hirsch index improving both by individual employees and the entire Institute, increase of grant activity and presentation activity at top-rated professional congresses. The growth of publication and presentation activities has been achieved at the reduction of research staff by 23%. From financial viewpoint effective contract resulted in the redistribution of resources in favour of more efficient researchers. The introduction of effective contract and increase of requirements for scientific output did not cause resistance of staff

  14. TraceContract

    Science.gov (United States)

    Kavelund, Klaus; Barringer, Howard

    2012-01-01

    TraceContract is an API (Application Programming Interface) for trace analysis. A trace is a sequence of events, and can, for example, be generated by a running program, instrumented appropriately to generate events. An event can be any data object. An example of a trace is a log file containing events that a programmer has found important to record during a program execution. Trace - Contract takes as input such a trace together with a specification formulated using the API and reports on any violations of the specification, potentially calling code (reactions) to be executed when violations are detected. The software is developed as an internal DSL (Domain Specific Language) in the Scala programming language. Scala is a relatively new programming language that is specifically convenient for defining such internal DSLs due to a number of language characteristics. This includes Scala s elegant combination of object-oriented and functional programming, a succinct notation, and an advanced type system. The DSL offers a combination of data-parameterized state machines and temporal logic, which is novel. As an extension of Scala, it is a very expressive and convenient log file analysis framework.

  15. Supply Chain Contracts with Multiple Retailers in a Fuzzy Demand Environment

    Directory of Open Access Journals (Sweden)

    Shengju Sang

    2013-01-01

    Full Text Available This study investigates supply chain contracts with a supplier and multiple competing retailers in a fuzzy demand environment. The market demand is considered as a positive triangular fuzzy number. The models of centralized decision, return contract, and revenue-sharing contract are built by the method of fuzzy cut sets theory, and their optimal policies are also proposed. Finally, an example is given to illustrate and validate the models and conclusions. It is shown that the optimal total order quantity of the retailers fluctuates at the center of the fuzzy demand. With the rise of the number of retailers, the optimal order quantity and the fuzzy expected profit for each retailer will decrease, and the fuzzy expected profit for supplier will increase.

  16. Avoiding surety contracts in bankruptcy procedure

    Directory of Open Access Journals (Sweden)

    Hiber Dragor

    2015-01-01

    does not mean that the guarantor gives up his right to claim from the debtor the amount paid because otherwise such transaction would represent an indirect gift rather than surety. This does mean that there is no remuneration for surety - a benefit the guarantor could expect from entering into a surety contract. Therefore, the author rejects the approach followed by a number of Serbia's courts that bankruptcy trustee may request a declaration that, in accordance with the rules on avoiding debtor's transactions, a surety contract has no legal effects.

  17. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  18. Governing Collaborative New Product Development : Toward a Configurational Perspective on the Role of Contracts

    NARCIS (Netherlands)

    Hofman, Erwin; Faems, Dries; Schleimer, Stephanie C.

    2017-01-01

    This study inductively explores the interplay among different contractual functions and their impact on project performance in collaborative new product development (NPD) projects. Applying a configurational perspective, contracts are conceptualized as bundles of different functions. In line with

  19. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  20. 24 CFR 888.320 - One-time Contract Rent determination.

    Science.gov (United States)

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND... Elderly or Handicapped, and Special Allocations Projects § 888.320 One-time Contract Rent determination...

  1. Provider cost analysis supports results-based contracting out of maternal and newborn health services: an evidence-based policy perspective.

    Science.gov (United States)

    Hatcher, Peter; Shaikh, Shiraz; Fazli, Hassan; Zaidi, Shehla; Riaz, Atif

    2014-11-13

    There is dearth of evidence on provider cost of contracted out services particularly for Maternal and Newborn Health (MNH). The evidence base is weak for policy makers to estimate resources required for scaling up contracting. This paper ascertains provider unit costs and expenditure distribution at contracted out government primary health centers to inform the development of optimal resource envelopes for contracting out MNH services. This is a case study of provider costs of MNH services at two government Rural Health Centers (RHCs) contracted out to a non-governmental organization in Pakistan. It reports on four selected Basic Emergency Obstetrical and Newborn Care (BEmONC) services provided in one RHC and six Comprehensive Emergency Obstetrical and Newborn Care (CEmONC) services in the other. Data were collected using staff interviews and record review to compile resource inputs and service volumes, and analyzed using the CORE Plus tool. Unit costs are based on actual costs of MNH services and are calculated for actual volumes in 2011 and for volumes projected to meet need with optimal resource inputs. The unit costs per service for actual 2011 volumes at the BEmONC RHC were antenatal care (ANC) visit USD$ 18.78, normal delivery US$ 84.61, newborn care US$ 16.86 and a postnatal care (PNC) visit US$ 13.86; and at the CEmONC RHC were ANC visit US$ 45.50, Normal Delivery US$ 148.43, assisted delivery US$ 167.43, C-section US$ 183.34, Newborn Care US$ 41.07, and PNC visit US$ 27.34. The unit costs for the projected volumes needed were lower due to optimal utilization of resources. The percentage distribution of expenditures at both RHCs was largest for salaries of technical staff, followed by salaries of administrative staff, and then operating costs, medicines, medical and diagnostic supplies. The unit costs of MNH services at the two contracted out government rural facilities remain higher than is optimal, primarily due to underutilization. Provider cost analysis

  2. Contractive function systems, their attractors and metrization

    Czech Academy of Sciences Publication Activity Database

    Banakh, T.; Kubiś, Wieslaw; Novosad, N.; Nowak, M.; Strobin, F.

    2015-01-01

    Roč. 46, č. 2 (2015), s. 1029-1066 ISSN 1230-3429 R&D Projects: GA ČR(CZ) GA14-07880S Institutional support: RVO:67985840 Keywords : fractal * attractor * iterated function system * contracting function system Subject RIV: BA - General Mathematics Impact factor: 0.717, year: 2015 http://www.apcz.pl/czasopisma/index.php/TMNA/article/view/TMNA.2015.076

  3. Nuclear Fusion Project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-12-01

    Short communications give a survey of 38 technology tasks, the development of ECRH power sources at 150 GHz, and 8 NET study contracts. The fusion technology contracts and the NET contracts are listed in the appendices I and II, respectively, while the KfK departments contributing to the Fusion Project and the Fusion Project Management Staff are listed in appendices III and IV, respectively. (GG)

  4. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  5. Solar buildings program contract summary, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries and by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.

  6. Bid process and contracting for remediation in New Mexico

    International Nuclear Information System (INIS)

    Fox, K.

    1994-01-01

    In an effort to provide cost effective and timely reclamation services to high priority leaking underground storage tank sites the New Mexico Environment Department has implemented a reclamation bidding process for qualified state contractors. The bid process was implemented in an attempt to make reclamation contractors more competitive and to encourage innovative technologies and contracting mechanisms. Overall the Bureau has received positive feedback from contractors participating in the process, especially regarding innovative technology and contracting. In addition, the process has provided excellent training for project managers and has allowed a critical review of the reclamation process for UST sites in general

  7. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  8. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  9. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  10. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  11. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  12. Number projected statistics and the pairing correlations at high excitation energies

    International Nuclear Information System (INIS)

    Esebbag, C.; Egido, J.L.

    1993-01-01

    We analyze the use of particle-number projected statistics (PNPS) as an effective way to include the quantum and statistical fluctuations, associated with the pairing degree of freedom, left out in finite-temperature mean-field theories. As a numerical application the exact-soluble degenerate model is worked out. In particular, we find that the sharp temperature-induced superfluid-normal phase transition, predicted in the mean-field approximations, is washed out in the PNPS. Some approximations as well as the Landau prescription to include statistical fluctuations are also discussed. We find that the Landau prescription provides a reasonable approximation to the PNPS. (orig.)

  13. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  14. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  15. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  16. On the contraction factors of long-chain branched macromolecules

    Czech Academy of Sciences Publication Activity Database

    Kratochvíl, Pavel; Netopilík, Miloš

    2014-01-01

    Roč. 51, February (2014), s. 177-181 ISSN 0014-3057 R&D Projects: GA ČR GCP205/11/J043 Institutional support: RVO:61389013 Keywords : long- chain branching * contraction factor * radius of gyration Subject RIV: CD - Macromolecular Chemistry Impact factor: 3.005, year: 2014

  17. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  18. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  19. Nova Scotia electricity market : frameworks for renewable energy contracting and cogeneration contracting : discussion document

    International Nuclear Information System (INIS)

    2006-01-01

    The recent Electricity Marketplace Governance Committee of Nova Scotia report issued a number of recommendations regarding renewable and cogeneration sales to retail consumers, as well as recommendations for top-up, spill rates and back-up rates to complement the operation of independent generating facilities. This discussion paper examined issues which need to be addressed in order to implement the recommendations. The discussion paper also included recommendations relating to the purchase of cogeneration output by the Nova Scotia Power Inc. (NSPI) under long term power purchase agreements. The aim of the paper was to provide a basis for the further discussion of issues in preparation for the development of future rules and regulations. The first part of the document identified ways for buyers and sellers to arrange contracts, as well as issues that need to be addressed at the institutional level to enable arrangements. Options for financial contracts and physical contracts were reviewed.The second part of the document examined pricing issues in the context of both financial and physical contract arrangements. Resolutions for both sets of options were proposed. Energy pricing principles were reviewed, as well as various pricing options and issues related to the analysis of price requirements. It was concluded that in order to support the safe, reliable and economic supply of electricity, the design of the electricity market should enable maximum flexibility in contractual arrangements and facilitate competition in ways that do not harm other parties

  20. 7 CFR 632.18 - Special projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  1. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  2. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  3. Incomplete Contract and Divisional Structures

    OpenAIRE

    Bao, T.; Wang, Y.

    2009-01-01

    In this paper we want to analyze the internal divisional structure within an organi- zation in the framework of incomplete contract theory. We use the framework of Aghion and Tirole (1997) and define the managerial control structure as \\sequence of search". A key feature of this paper which differentiate it from other works in the literature is that we add add an ex post bargaining phase in which the managers can agree on the project which maximize their joint private benefit. Our model shows...

  4. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  5. Survey and analysis of satellite-based telemedicine projects involving Japan and developing nations: investigation of transmission rates, channel numbers, and node numbers.

    Science.gov (United States)

    Nakajima, I; Natori, M; Takizawa, M; Kaihara, S

    2001-01-01

    We surveyed interactive telemedicine projects via telecommunications satellite (AMINE-PARTNERS, Post-PARTNERS, and Shinshu University Project using Inmarsat satellites) offered by Japan as assistance to developing countries. The survey helped clarify channel occupation time and data transfer rates. Using our survey results, we proposed an optimized satellite model with VSATs simulating the number of required channels and bandwidth magnitude. For future implementation of VSATs for medical use in developing nations, design of telecommunication channels should take into consideration TCP/IP-based operations. We calculated that one hub station with 30-76 VSATs in developing nation can be operated on bandwidth 6 Mbps using with 128 Kbps videoconferencing system for teleconsultation and teleconference, and linking with Internet.

  6. Production Contracts and the Spot Market Price of Hogs

    OpenAIRE

    Key, Nigel D.

    2010-01-01

    The increasing use of production contracts in the hog sector has reduced the number of spot market transactions, raised concerns about price manipulation and helped to spur legislation requiring price reporting by packers. Using data from the 2002 and 2007 Censuses of Agriculture, this study looks for evidence of market manipulation by examining whether the local prevalence of contracting affects the average price received by independent producers. The empirical approach uses a fixed-effects ...

  7. The economics of energy service contracts

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, S. [University of Sussex, Brighton (United Kingdom). Sussex Energy Group, SPRU -Science and Technology Policy Research

    2007-01-15

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test. (author)

  8. The economics of energy service contracting

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, Steve [Univ. of Sussex (United Kingdom). SPRU

    2005-07-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transactions cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the 'contestability' of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test.

  9. The economics of energy service contracts

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2007-01-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test

  10. Role of Renewable Energy Certificates in Developing New Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Holt, E.; Sumner, J.; Bird, L.

    2011-06-01

    For more than a decade, renewable energy certificates (RECs) have grown in use, becoming a common way to track ownership of the renewable and environmental attributes of renewable electricity generation. In recent years, however, questions have risen about the role RECs play in the decision to build new renewable energy projects. Information from a variety of market participants suggests that the importance of RECs in building new projects varies depending on a number of factors, including electricity market prices, the cost-competitiveness of the project, the presence or absence of public policies supportive of new projects, contract duration, and the perspective of different market participants. While there is no single answer to the role that RECs play, there are situations in which REC revenues are essential to project economics, as well as some where REC revenues may have little impact. To strengthen the role RECs play in both compliance and voluntary markets, there are a number of options that could be considered. In compliance markets, lawmakers or regulators would have to adopt measures that strengthen the role of RECs in the development of new projects, while in voluntary markets, it would be up to program leaders and market participants themselves to implement measures.

  11. Nuclear fusion project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-05-01

    This semi-annual report gives 36 short descriptions of the work done in the framework of the Nuclear Fusion Project and outlines studies for NET/INTOR and for ECRH power sources at 150 GHz. Tables of fusion technology contracts, of NET contracts, of KfK departments contributing to the Fusion Project, and of the Fusion Project management staff complete this report. (GG)

  12. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  13. [3H]QNB binding and contraction of rabbit colonic smooth muscle cells

    International Nuclear Information System (INIS)

    Ringer, M.J.; Hyman, P.E.; Kao, H.W.; Hsu, C.T.; Tomomasa, T.; Snape, W.J. Jr.

    1987-01-01

    The authors used radioligand binding and studies of cell contraction to characterize muscarinic receptors on dispersed smooth muscle cells from rabbit proximal and distal colon. Cells obtained after serial incubations in collagenase were used to measure binding of tritiated quinuclidinyl benzilate ([ 3 H]QNB). At 37 degree C, specific [ 3 H]QNB binding was saturable and linearly related to cell number. Nonlinear regression analysis was used to determine the affinity of [ 3 H]QNB for its receptor. The IC 50 for the muscarinic agonists bethanechol and oxotremorine were 80 and 0.57 μM, respectively. Hill coefficients were 0.67 for both, suggesting more complex interaction involving receptors of different affinities. In studies of cell contraction, bethanechol stimulated a dose-dependent decrease in cell length with half the maximal contraction occurring at 100 pM. These results suggest that (1) contraction is mediated by binding of bethanechol to M 2 -muscarinic receptors and that (2) there are a large number of spare receptors in colonic smooth muscle

  14. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  15. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  16. On contact numbers in random rod packings

    NARCIS (Netherlands)

    Wouterse, A.; Luding, Stefan; Philipse, A.P.

    2009-01-01

    Random packings of non-spherical granular particles are simulated by combining mechanical contraction and molecular dynamics, to determine contact numbers as a function of density. Particle shapes are varied from spheres to thin rods. The observed contact numbers (and packing densities) agree well

  17. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  18. 41 CFR 101-30.101-3 - National stock number.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true National stock number. 101-30.101-3 Section 101-30.101-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...

  19. 41 CFR 115-1.109 - Numbering in FPMR system.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Numbering in FPMR system. 115-1.109 Section 115-1.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) ENVIRONMENTAL PROTECTION AGENCY 1-INTRODUCTION 1.1-Regulation System § 115-1...

  20. 41 CFR 101-1.109 - Numbering in FPMR System.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Numbering in FPMR System. 101-1.109 Section 101-1.109 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation System § 101...

  1. New nuclear projects: structure, supply chain and financing

    International Nuclear Information System (INIS)

    Keppler, J.H.; Cometto, M.

    2015-01-01

    In 2015 there were 68 reactors being constructed throughout the world and 159 projects were planned. The projects for the construction of nuclear reactors face challenging issues like financing and management. The NEA (Nuclear Energy Agency) has analysed the feedback experience on a sample of reactor projects and of reactors recently commissioned in order to draw lessons on 3 issues: financing, long-term electricity price, and project management including the supply chain. It is already known that technologies requiring high initial capital like nuclear power or renewable energies, are very sensitive to the long-term price of electricity. The study shows that for a debt ratio below 60%, the risk for the investor is low even if the long-term electricity price drops by 30 %. Because of the complexity of the construction of a nuclear power plant there are mainly 3 types of project management: the turnkey project, the split package approach (a relatively low number of suppliers) and the multi-contract approach. The turnkey approach is favoured by the new entrants in the nuclear world. The harmonization of regulations and the convergence of the safety requirements are necessary to build an efficient and competitive supply chain. (A.C.)

  2. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  3. Project approach helps technology transfer

    International Nuclear Information System (INIS)

    Walcher, M.W.

    1982-01-01

    The placing of the contract by the National Power Corporation with Westinghouse for the Philippines nuclear power plant (PNPP-1) is described. Maximised use of Philippine contractors under Westinghouse supervision was provided for. Technology transfer is an important benefit of the contract arrangements, since National Power Corporation project management acquires considerable nuclear plant experience during plant construction through consultation with technical personnel. (U.K.)

  4. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ..., and any other applicable water-related contracts. 7. Identify the organizational structure planned for... Fryingpan-Arkansas Project (Fry-Ark Project), Colorado AGENCY: Bureau of Reclamation, Interior. ACTION... at Pueblo Dam River Outlet of the Fry-Ark Project, Colorado. Reclamation is considering such...

  5. Collective hydrodynamic communication through ultra-fast contractions

    Science.gov (United States)

    Bhamla, Saad; Mathijssen, Arnold; Prakash, Manu

    2017-11-01

    The biophysical relationships between physiological sensors and actuators were fundamental to the development of early life forms, as responding to external stimuli promptly is key to survival. We study an unusual protist Spirostomum ambiguum, a single-celled organism that can grow up to 4mm in size, visible to the naked eye, as a model system for impulsive systems. Coiling its cytoskeleton, this ciliate can contract its long body within milliseconds, one of the fastest accelerations known in cell biology. We demonstrate that these rapid contractions generate long-ranged vortex flows that can trigger other cells to contract, repeatedly, which collectively leads to an ultra-fast hydrodynamic signal transduction across a colony that moves hundreds of times faster than the swimming speed. By combining high-speed PIV experiments and analytical modelling we determine the critical rheosensitivity required to sustain these signal waves. Whereas the biological motive is not fully understood, contractions are known to release toxins from membrane-bound extrusomes, thus we hypothesize that synchronised discharges could facilitate the repulsion of large-scale predators cooperatively. Please also see our other talk ``Rheosensing by impulsive cells at intermediate Reynolds numbers''.

  6. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  7. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  8. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  9. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  10. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  12. An Analysis of Category Management of Service Contracts

    Science.gov (United States)

    2017-12-01

    comprised of four steps to guide future category management teams in analyzing data and applying Category Management principles through the use of...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT AN ANALYSIS OF CATEGORY MANAGEMENT OF SERVICE CONTRACTS December 2017...Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project

  13. Projections on the number of individuals with atrial fibrillation in the European Union, from 2000 to 2060.

    Science.gov (United States)

    Krijthe, Bouwe P; Kunst, Anton; Benjamin, Emelia J; Lip, Gregory Y H; Franco, Oscar H; Hofman, Albert; Witteman, Jacqueline C M; Stricker, Bruno H; Heeringa, Jan

    2013-09-01

    Since atrial fibrillation (AF) is associated with increased risks of cardiovascular and cerebrovascular complications, estimations on the number of individuals with AF are relevant to healthcare planning. We aimed to project the number of individuals with AF in the Netherlands and in the European Union from 2000 to 2060. Age- and sex-specific AF prevalence estimates were obtained from the prospective community-based Rotterdam Study. Population projections for the Netherlands and the European Union were obtained from the European Union's statistics office. In the age stratum of 55-59 years, the prevalence of AF was 1.3% in men (95% CI: 0.4-3.6%) and 1.7% in women (95% CI: 0.7-4.0%). The prevalence of AF increased to 24.2% in men (95% CI: 18.5-30.7%), and 16.1% in women (95% CI: 13.1-19.4%), for those >85 years of age. This age- and sex-specific prevalence remained stable during the years of follow-up. Furthermore, we estimate that in the European Union, 8.8 million adults over 55 years had AF in 2010 (95% CI: 6.5-12.3 million). We project that this number will double by 2060 to 17.9 million (95% CI: 13.6-23.7 million) if the age- and sex-specific prevalence remains stable. We estimate that from 2010 to 2060, the number of adults 55 years and over with AF in the European Union will more than double. As AF is associated with significant morbidities and mortality, this increasing number of individuals with AF may have major public health implications.

  14. Improved projects execution and contract strategies. The Hyde experience

    International Nuclear Information System (INIS)

    Murphy, D.L.

    1993-01-01

    The conference paper deals with the obtained experience from the Hyde development project on the UK continental shelf. The industry is searching for more effective ways to develop North Sea oil and gas assets. Hyde, like many other projects, was uneconomic using current industry development and operation norms. BP, as a results, challenged its management to change the norms and achieve new levels of performance. The Hyde field was discovered in 1967. At that time, and until late 1991, it was assessed non-commercial. Between discovery and late 1991, gas prices increased in real terms but not as much as capital and operating costs. The initial BP challenge for Hyde was to make it commercial. The paper discusses the sanction phase, the mould breaking, and the project development breakthrough. 2 figs

  15. Configuration mixing of mean-field wave functions projected on angular momentum and particle number: Application to 24Mg

    International Nuclear Information System (INIS)

    Valor, A.; Heenen, P.-H.; Bonche, P.

    2000-01-01

    We present in this paper the general framework of a method which permits to restore the rotational and particle number symmetries of wave functions obtained in Skyrme HF + BCS calculations. This restoration is nothing but a projection of mean-field intrinsic wave functions onto good particle number and good angular momentum. The method allows us also to mix projected wave functions. Such a configuration mixing is discussed for sets of HF + BCS intrinsic states generated in constrained calculations with suitable collective variables. This procedure gives collective states which are eigenstates of the particle number and the angular momentum operators and between which transition probabilities are calculated. An application to 24 Mg is presented, with mean-field wave functions generated by axial quadrupole constraints. Theoretical spectra and transition probabilities are compared to the experiment

  16. 77 FR 23369 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Science.gov (United States)

    2012-04-18

    ... Business Administration (SBA) may not accept a sole- source 8(a) contract in excess of $20 million for... is no conflict with the law. Execution of the J&A prior to the SBA's initiation of contract... small number of businesses that have been awarded 8(a) contracts over the $20 million threshold may be...

  17. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  18. 7 CFR 1484.35 - Must Cooperators follow specific contracting procedures?

    Science.gov (United States)

    2010-01-01

    ... the decision-making process. [64 FR 52630, Sept. 30, 1999. Redesignated and amended at 65 FR 9995, Feb...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS PROGRAMS TO..., which are reimbursed with project funds, are documented by a purchase order, invoice, or contract; (2...

  19. [Contract learning: effects of professionalization on the student nurse].

    Science.gov (United States)

    Jubin, Patricia

    2013-03-01

    The reengineering of nurse training implies the implementation of self-development, empowering tools and a reshaping of the function of accompaniment during training which becomes a shared function. This work is part of a psycho-socio-educational approach of the accompaniment to self-directed learning and also in the field of practices of health and social work. This study contributes to the identification of the conditions of efficiency of contracting between student nurses, tutors and instructors. It aims to explore the interest of a triangular steering of the learning contract centered on the student's individual project and also the interest of meetings during training as triggers to a process of self-construction of competences. Moreover, the study aims to identify the effects of contract on professionalization. Our study reverts to the basic question of learning by contract as a pillar for the self-directed learning in an alternating training context. The empirical approach takes into account a qualitative study carried out with 15 people (tutors, managers, student nurses and instructors) in 3 health care structures and a quantitative study based on 78 first year students, 106 second year students, and 47 third year students at the same nursing education institute. The study shows that learning by contract is empowering and professionalizing, if the student is placed in favorable conditions of learning and contractual relationship.

  20. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  1. Venture financing of start-ups: A model of contract between VC fund and entrepreneur

    Directory of Open Access Journals (Sweden)

    Osintsev Yury

    2010-01-01

    Full Text Available Venture capital has become one of the main sources of innovation in the modern, global economy. It is not just a substitute for bank loans: it has proven to be a more efficient way of financing projects at different stages. On one hand, venture financing allows for projects with higher risk, which leads to the possibility of higher returns on investment. On the other hand, venture investors who usually have managerial experience often participate in governing the business, which certainly adds value to the enterprise. In this paper we establish the model of contract between the venture capital fund and the entrepreneur, focusing on probably the most important issue of this contract: the shares of the parties in the business. The shares in the company determine the distribution of the joint surplus. The expected joint profits are not just exogenously specified in the contract but are dependent on the behavioral variables of both parties at the stage of fulfilling the contract. We call the behavioral variable of the entrepreneur ‘effort’ and the one of the venture fund ‘advice’. The probability of the project’s success, and hence the expected joint revenues, are increased by these two. However, both kinds of effort are costly to the respective parties that have made them. Based on this fact we can elaborate the profit functions of both sides of the contract. Our model can be considered as a basis for specifying contracts concerning venture financing. It can provide the logic for how the equilibrium shares of entrepreneur and venture fund are obtained.

  2. Financing the energy renovation of public buildings through Internal Contracting. Infinite Solutions Guidebook

    International Nuclear Information System (INIS)

    Schilken, Peter; Turner, Ian; Kuehnbach, Matthias; Simic, Ivan; Kuharic, Boris; Laranjeira, Celia; Rodrigues, Carlos; Couceiro, Carla; Presotto, Agnese; Mazzeschi, Alessandro; Cleto, Joao

    2017-02-01

    Meeting the European energy and climate policy objectives will require the mobilisation of substantial energy efficiency and renewable energy investments at the local level. Given both the substantial effort necessary to finance the energy transition and restricted municipal budgets, it is clear that these objectives cannot be met through traditional public financing such as grants or direct investment, but by finding a new approach to financing solutions. This Energy Cities guidebook is built upon a comprehensive analysis of Stuttgart's Internal Contracting scheme and a detailed questioning of it by the learning authorities within the INFINITE Solutions project. It is intended to offer guidelines to municipalities as well as universities, hospitals or other institutions interested in applying Internal Contracting to improve their energy consumption and efficiency performance. The approach of this guidebook is developed as follows: The concept of contracting - especially Internal Contracting - is introduced. Universal guidance is offered on how to implement an Internal Contracting scheme and keep it working over the long term. The Internal Contracting scheme is presented in practice. Several cities describe their individual approaches to Internal Contracting and the various ways they have been able to adapt the scheme

  3. Basic Conditions of Validity of Electronic Contracts in Iran and UNCITRAL Model Law

    Directory of Open Access Journals (Sweden)

    Abbas Karimi

    2017-02-01

    Full Text Available Diverse activities such as electronic exchange of goods and services, instant digital content delivery, electronic funds transfer, electronic stock exchange, electronic bill of lading, commercial projects, common engineering and design, sourcing, government purchase, direct marketing and post-sales services included in e-commerce field.  Due to the increasing spread of the electronic world in all aspects, electronic contracts, in turn, was of great importance and made significant contributions in business contracts. The present study aims to investigate the concept, fundamentals and history of electronic contracts referring to UNCITRAL Model Law on Electronic Commerce and Electronic Commerce Act (1996. The results indicate that in terms of the conclusion and obligations of the parties, contract in cyberspace in general is similar to the contract in the real world and in this respect, there is no major difference between these two contexts. Potential electronic contracts considered as written ones and Electronic signatures recognized as valid as the basis of the validity of the will in electronic trading.

  4. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  5. Power plant construction contracting in a changing regulatory environment

    International Nuclear Information System (INIS)

    Person, J.C.

    1993-01-01

    The 1965 blackout in the Northeast provided the wake-up call that spawned in unprecedented program of power plant construction by electric utilities. This building program began in the late 1960s and continued unabated through the 1970s. Beginning in the late 1970s, state regulators began in era of 'prudence' reviews which disallowed as imprudent significant portions of the costs of certain nuclear units being brought on line at the time. This regulatory experience brought about a fundamental change in the way in which utilities evaluated the need for additional capacity. This paper explores construction contracting trends in light of recent developments in the relationship between the electric utility and the state regulator. It is within this context that the utility decides: (1) whether to build, buy, or save; and (2) if the decision is to build, which project planning and administration considerations will maximize the utility's ability to incorporate project costs into the ratebase. In order to put these issues into their proper perspective, this paper first presents a brief overview of the prudence decisions of the past, and the chilling effect of these decisions generally on new project planning. The paper next focuses on the recent changes to the post-construction prudence review model, including the introduction of pre-approval arrangements and rolling prudence reviews. Following that will be a survey of new construction spending decisions in light of these changes. After an analysis of the bases for the prudence disallowances of the past and the application of the lessons learned from these disallowances to contract planning and administration issues of today, the paper will close with a discussion of the relative advantages and disadvantages of the most commonly used contract delivery methods in today's regulatory environment

  6. DSN Aperture Enhancement Project Office

    Science.gov (United States)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  7. Positive and negative implications entailed by fixed-term employment contracts

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2018-03-01

    Full Text Available Generally, fixed-term employment contracts are seen as a stepping stone to permanent employment; they have become popular among the flexible forms of work contracts, and are the object of an increasing number of debates and assessments, investigating both the respective legislation and the specific consequences on the parties concluding a fixed-term employment contract. Despite the positive aspects of temporary employment – a positive effect on the rate of employment, and the common perception of such contracts as a preliminary step to permanent employment, as well as the flexibility they bring to the labor market – one cannot ignore the negative implications of fixed-term contracts on the nature of the employment relationship, the system of social protection, the working conditions, the economic security, and the job stability. Based on these considerations, the present paper investigates the advantages and disadvantages of the individual fixed-term employment contract from the standpoints of both employers and employees. Obviously, this approach aims to explore the usefulness and importance of these contract types, as means for balancing the needs of employers and employees on the labor market, and for identifying concrete instances that justify the liberalization of fixed-term employment, despite all the inherent risks entailed by any type of non-standard work: lack of job security; reduced social protection and security for those concluding such a contract.

  8. Governance in Blockchain Technologies & Social Contract Theories

    Directory of Open Access Journals (Sweden)

    Wessel Reijers

    2016-12-01

    Full Text Available This paper is placed in the context of a growing number of social and political critiques of blockchain technologies. We focus on the supposed potential of blockchain technologies to transform political institutions that are central to contemporary human societies, such as money, property rights regimes, and systems of democratic governance. Our aim is to examine the way blockchain technologies canbring about - and justify - new models of governance. To do so, we draw on the philosophical works of Hobbes, Rousseau, and Rawls, analyzing blockchain governance in terms of contrasting social contract theories. We begin by comparing the justifications of blockchain governance offered by members of the blockchain developers’ community with the justifications of governance presented within social contract theories. We then examine the extent to which the model of governance offered by blockchain technologies reflects key governance themes and assumptions located within social contract theories, focusing on the notions of sovereignty, the initial situation, decentralization and distributive justice.

  9. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  10. Grounds for dispensing with public tender procedures in Government Contracting

    Directory of Open Access Journals (Sweden)

    P Bolton

    2006-01-01

    Full Text Available The Constitution of the Republic of South Africa1 provides that organs of state must comply with five principles when procuring goods or services: procurement procedures must be fair, equitable, transparent, competitive and cost-effective. In short, this means that organs of state should make use of competition when procuring goods or services. They should shop around and attract the maximum number of contractors who will participate in such competition. The aim should be the attainment of value for money, meaning, public money should be spent in an effective and efficient manner. Those who participate in competitions should also be treated fairly and without bias. In principle, no preferences should be afforded to different contractors; all contracting parties should have equal access to competition; some contractors should not be afforded more time for the preparation and submission of quotes or tenders than others; and the same information should be made available to all contracting parties. Government procurement procedures should further be transparent, meaning public or open. Thus, organs of state should not contract behind closed doors – government contracts should, as a rule, be advertised. Depending on the nature and value of a particular contract, the use of a public call for tenders is generally the best way to ensure compliance with the principles in the Constitution. By nature, a pubic call for tenders is open, it assists in the prevention of fraud and favouritism, and it ensures that the maximum number of contractors is approached to compete for a contract.Organs of state can also compare prices and quality and can contract with whoever offers the best deal. Most legislation therefore proceeds on the basis that procurement takes place by way of tendering. Generally, contracts above R200 000 are subject to public tender procedures. In certain instances, however, a public call for tenders may be inappropriate regardless of the high

  11. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  12. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  13. A third generation of performance contracting in danish central government?

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2017-01-01

    This paper compares the content of performance contracts in Danish central government over time in order to identify whether – and if so, how – it develops. The analysis is conducted as a two-step, mixed methods study. First, a quantitative study was carried out based on a study of all performance...... contracts in Danish central government in 2002, 2006, 2009, 2012 and 2014. For each year, all performance contracts have been coded according to the number and type of targets included in them. A range of qualitative interviews was then carried out, and Ministry of Finance recommendations were consulted...... of outcomes has increased, activity-oriented targets have decreased, and targets for internal management decreased in the mid-2000s before again increasing more recently. On this basis, performance contracting in Danish central government is argued to have entered a third generation....

  14. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  15. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  16. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  17. Note on Deduction Theorems in contraction-free logics

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel; Cintula, Petr

    2012-01-01

    Roč. 58, č. 3 (2012), s. 236-243 ISSN 0942-5616 R&D Projects: GA ČR GAP202/10/1826 Grant - others:Austrian Science Fund (FWF)(AT) START Y544-N23 Institutional research plan: CEZ:AV0Z10300504 Keywords : Local Deduction Theorem * BCI-logic * Substructural logics * Rule of contraction Subject RIV: BA - General Mathematics Impact factor: 0.376, year: 2012

  18. Service contracts in the petroleum industry - a practical approach; Contrato de servicos na industria do petroleo - uma abordagem pratica

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney P. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The worldwide competition and the availability of new business opportunities have paved the way for service contracts as an attractive option when performing feasibility analysis for gas and energy projects. This paper addresses this subject and incorporates the experience gotten at PETROBRAS focusing on Compression Service Contract for Gas Pipeline Transmission System and also on Gas Processing Contract for gas dew point adjustment for natural gas production so as to specify the gas for industrial and automotive use. The methodology presented, that incorporates Monte Carlo Simulation for Risk Analysis, can be applied for any project with similar characteristics. This paper also underlines the importance of the use of Risk Analysis for feasibility studies. (author)

  19. Advanced calculations developed for the ITER project within of engineering support framework contracts to F4E; Calculos avanzados desarrollados para el proyecto ITER dentro de los contratos marco de soporte de ingenieria para F4E

    Energy Technology Data Exchange (ETDEWEB)

    Bosch, C.; Polo, J.; Garcia Cid, J.; Guirao, J.; Fernandez, E.; Bayon, A.; Caixas, J.

    2013-07-01

    Present the different kind of analyses carried out within the engineering support framework contracts for F4E in the period 2009-2013 and its evolution according to project needs and Vacuum Vessel manufacturing status.

  20. Development of a Blueprint Impact System of the risks on construction projects Implementation

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2015-08-01

    Full Text Available In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization. The research aims to develop a blue print to analyze the relationship between the impact of risk and stages of implementing of the project and, the effect of risk relationship with the type of contract, and the impact of risks to do with the type of construction works. In this paper a number of risks has been identified that have already occurred from the study of a number of construction projects completed and theoretical studies and interview a number of construction industry experts to determine the extent of the impact of these risks in each of these three axes in construction projects in Iraq for the purpose of responding and management. The study found a set of conclusions such as existing of priority in happiness of risks which proof that there is an relationship between the risks and sort of stage, contract and constructional work. In the light of what has been reached for the purpose of benefiting from the computer automated features a program have been used ( Vanguard Software System to build the decision tree in order to manage the risks according to their priority in happiness.

  1. Primary contraction of skin grafts: a porcine preliminary study

    Directory of Open Access Journals (Sweden)

    Alexander Bogdanov Berezovsky

    2015-03-01

    Full Text Available Aim: Skin grafting is a common clinical practice for plastic surgeons, yet primary contraction of these grafts is a neglected topic. This study was designed to investigate primary contraction and introduce the shape of skin graft as a possible factor that modifies primary contraction behavior, using porcine models. Methods: In the first series, full-thickness skin grafts (FTSGs and split-thickness skin grafts (STSGs were compared. In a second series, how the shape of the skin graft affected the degree of contraction was examined. Results: The mean percentage of FTSG shrinkage was 12.04%, and the median was 12.18%. The mean percentage of STSG shrinkage was 6.87%, and the median was 5%. Circle-shaped and square-shaped FTSGs showed mean/median graft shrinkage of 5.83%/6.93% and 4.15%/3.75%, respectively. In STSGs, the circle-shaped and square-shaped grafts had mean/median graft shrinkage of 1.07%/0% and 0.31%/0%, respectively. Conclusion: Our preliminary report revealed an expected greater shrinkage of FTSGs compared with STSGs. Furthermore, in a limited number of specimens, the shape of the skin graft seemed to affect the primary contraction of the STSGs.

  2. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  3. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Directory of Open Access Journals (Sweden)

    Jessica A Kaminsky

    Full Text Available This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  4. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Science.gov (United States)

    Kaminsky, Jessica A

    2017-01-01

    This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  5. 18 CFR 367.24 - Construction and service contracts for other companies.

    Science.gov (United States)

    2010-04-01

    ... classification of expenditures relating to projects that will meet the accounting requirements of the company for... companies. (a) Expenditures made in the performance of construction or service contracts, under which the..., construction payrolls, outside services, and other expenses which are directly attributable to the performance...

  6. Problems of implementing a large contract abroad: the Cordoba nuclear power station

    International Nuclear Information System (INIS)

    Caruso, P.

    1984-01-01

    The building of Argentina's second nuclear power station proved to be a true test of project-management skills: the contract was to be a joint effort between an Italian and a Canadian company, to be implemented in a country thousands of miles away; the Argentinian government changed four times during the course of the project; and the local currency was always unstable and unpredictable. The various difficulties that arose, and how they were solved, are described, and the role of the project management is evaluated. (author)

  7. Psychological contract in the light of flexible employment: The review of studies

    Directory of Open Access Journals (Sweden)

    Dorota Żołnierczyk-Zreda

    2016-08-01

    Full Text Available Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers’ disadvantage, as well as more transactional in their nature than those of permanent workers. The temporary workers’ well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4:529–536

  8. What constitutes the gas sales contract in the evolving marketplace?

    International Nuclear Information System (INIS)

    Hughes, T.M.

    1996-01-01

    A general overview of certain fundamental issues of contract law, which are relevant to gas sales transactions, was presented. Since deregulation, parties of the Canadian natural gas market are free to negotiate the terms of arrangements and contracts with any number of buyers and sellers. With deregulation also came a substantial increase in the amount of litigation regarding sales contracts. Two basic issues that should be kept in mind when negotiating any gas sales contract were letter agreements, (two versions of non-binding letters of intent), and requirement of writing. Within the requirements of writing one should be mindful of the legal implications of the fraud statutes, the Sale of Goods Act, what constitutes a sufficient note or memorandum, what constitutes the requisite signature, contracting out of the requirement of writing and signature on the mass agreement, certainty of terms, and the terms implied by legislation. It was considered advantageous for both buyers and sellers to continue to be vigilant about the contractual arrangements respecting all of their gas transactions

  9. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  10. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  11. 77 FR 10767 - Rate Adjustments for Indian Irrigation Projects

    Science.gov (United States)

    2012-02-23

    ... Irrigation Project on the proposed rates about the following issues: (1) The methodology for O&M rate setting..., Irrigation Project Manager, (Project operations and management contracted to Tribes), R.R.1, Box 980, Harlem... Projects AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of rate adjustments. SUMMARY: The...

  12. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  13. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  14. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  15. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  16. 42 CFR 137.410 - For the purposes of section 110 of the Act [25 U.S.C. 450m-1] does the term contract include...

    Science.gov (United States)

    2010-10-01

    ....C. 450m-1] does the term contract include compacts, funding agreements, and construction project... the term contract include compacts, funding agreements, and construction project agreements entered into under Title V? Yes, for the purposes of section 110 of the Act [25 U.S.C. 450m-1] the term...

  17. CAT-ASVAB Technical Bulletin Number 1

    Science.gov (United States)

    2006-03-01

    CAT -ASVAB Technical Bulletin #1 Personnel Testing Division Defense Manpower Data Center March 2006 Report...2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE CAT -ASVAB Technical Bulletin #1 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...Hetter, R. D. "Psychometric Procedures for Administering CAT -ASVAB" (pp. 131-140) Chapter 4 Hetter, R. D., & Sympson J. B. "Item Exposure

  18. Army Communicator. Volume 35, Number 3, Fall 2010

    Science.gov (United States)

    2010-01-01

    Malaysia ...Center. IT contractors were also an integral part of the task force design and specifically for completing the sizable DELL tech refresh contract...cost avoidance alone from completion of the DELL tech refresh project ahead of schedule and implementation of COOP and CEN- TRIX networks.

  19. Manipulation of procurement contracts: evidence from the introduction of discretionary thresholds

    Czech Academy of Sciences Publication Activity Database

    Palguta, Ján; Pertold, Filip

    2017-01-01

    Roč. 9, č. 2 (2017), s. 293-315 ISSN 1945-7731 R&D Projects: GA TA ČR(CZ) TD020099 Institutional support: RVO:67985998 Keywords : public procurement * contracts * corruption Subject RIV: AH - Economics OBOR OECD: Applied Economics, Econometrics Impact factor: 3.133, year: 2016

  20. Research of Project Cost Management System Based on the Target Cost Contract%基于目标成本合同的工程项目成本管理体系研究

    Institute of Scientific and Technical Information of China (English)

    陈继光

    2016-01-01

    With the constant construction of social engineering, the theory and method of project management also have the rapid development in the process. And the mode of partners' relationships is more advocated. Among them, the target cost contract is a kind of relatively common partnership mode, it can help project contractor and owner to gain better economic benefits. This paper studies the engineering project cost management system of the target cost contract.%随着社会工程的不断建设,工程项目管理的理论以及方法也在此过程中得到了较为快速的发展,且更加倡导合作伙伴的关系模式.其中,目标成本合同则是一种较为常用的伙伴关系模式,能够帮助项目承包商以及业主更好的从中获得经济收益.在本文中,将就基于目标成本合同的工程项目成本管理体系进行一定的研究.

  1. Development of an image reconstruction algorithm for a few number of projection data

    International Nuclear Information System (INIS)

    Vieira, Wilson S.; Brandao, Luiz E.; Braz, Delson

    2007-01-01

    An image reconstruction algorithm was developed for specific cases of radiotracer applications in industry (rotating cylindrical mixers), involving a very few number of projection data. The algorithm was planned for imaging radioactive isotope distributions around the center of circular planes. The method consists of adapting the original expectation maximization algorithm (EM) to solve the ill-posed emission tomography inverse problem in order to reconstruct transversal 2D images of an object with only four projections. To achieve this aim, counts of photons emitted by selected radioactive sources in the plane, after they had been simulated using the commercial software MICROSHIELD 5.05, constitutes the projections and a computational code (SPECTEM) was developed to generate activity vectors or images related to those sources. SPECTEM is flexible to support simultaneous changes of the detectors's geometry, the medium under investigation and the properties of the gamma radiation. As a consequence of the code had been followed correctly the proposed method, good results were obtained and they encouraged us to continue the next step of the research: the validation of SPECTEM utilizing experimental data to check its real performance. We aim this code will improve considerably radiotracer methodology, making easier the diagnosis of fails in industrial processes. (author)

  2. Development of an image reconstruction algorithm for a few number of projection data

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Wilson S.; Brandao, Luiz E. [Instituto de Engenharia Nuclear (IEN-CNEN/RJ), Rio de Janeiro , RJ (Brazil)]. E-mails: wilson@ien.gov.br; brandao@ien.gov.br; Braz, Delson [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programa de Pos-graduacao de Engenharia (COPPE). Lab. de Instrumentacao Nuclear]. E-mail: delson@mailhost.lin.ufrj.br

    2007-07-01

    An image reconstruction algorithm was developed for specific cases of radiotracer applications in industry (rotating cylindrical mixers), involving a very few number of projection data. The algorithm was planned for imaging radioactive isotope distributions around the center of circular planes. The method consists of adapting the original expectation maximization algorithm (EM) to solve the ill-posed emission tomography inverse problem in order to reconstruct transversal 2D images of an object with only four projections. To achieve this aim, counts of photons emitted by selected radioactive sources in the plane, after they had been simulated using the commercial software MICROSHIELD 5.05, constitutes the projections and a computational code (SPECTEM) was developed to generate activity vectors or images related to those sources. SPECTEM is flexible to support simultaneous changes of the detectors's geometry, the medium under investigation and the properties of the gamma radiation. As a consequence of the code had been followed correctly the proposed method, good results were obtained and they encouraged us to continue the next step of the research: the validation of SPECTEM utilizing experimental data to check its real performance. We aim this code will improve considerably radiotracer methodology, making easier the diagnosis of fails in industrial processes. (author)

  3. Conformal maps and group contractions in nuclear structure

    International Nuclear Information System (INIS)

    Bonatsos, D.

    2011-01-01

    In mathematics, a conformal map is a function which preserves angles. We show how this procedure can be used in the framework of the Bohr Hamiltonian, leading to a Hamiltonian in a curved space, in which the mass depends on the nuclear deformation β, while it remains independent of the collective variable γ and the three Euler angles. This Hamiltonian is proved to be equivalent to that obtained using techniques of Supersymmetric Quantum Mechanics. Group contraction is a procedure in which a symmetry group is reduced into a group of lower symmetry in a certain limiting case. Examples are provided in the large boson number limit of the Interacting Boson Approximation (IBA) model by a) the contraction of the SU(3) algebra into the [R 5 ]SO(3) algebra of the rigid rotator, consisting of the angular momentum operators forming SO(3), plus 5 mutually commuting quantities, the quadrupole operators, b) the contraction of the O(6) algebra into the [R 5 ]SO(5) algebra of the γ-unstable rotator. We show how contractions can be used for constructing symmetry lines in the interior of the symmetry triangle of the IBA model. (author)

  4. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  5. LLWnotes - Volume 11, Number 4

    International Nuclear Information System (INIS)

    1996-05-01

    This document is the May 1996 issue of LLWnotes. It contains articles and news items on the following topics: news items related to states and compacts; Low-Level Radioactive Waste (LLW) Forum activities; court rulings and calendars; US DOE testing at Ward Valley; US BLM contract with Lawrence Livermore National Laboratory; Mixed Waste Pilot Project Schedule; extension of US EPA's mixed waste enforcement moratorium; EPA Advisory Committee on research program operation; and decommissioning

  6. LLWnotes - Volume 11, Number 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This document is the May 1996 issue of LLWnotes. It contains articles and news items on the following topics: news items related to states and compacts; Low-Level Radioactive Waste (LLW) Forum activities; court rulings and calendars; US DOE testing at Ward Valley; US BLM contract with Lawrence Livermore National Laboratory; Mixed Waste Pilot Project Schedule; extension of US EPA`s mixed waste enforcement moratorium; EPA Advisory Committee on research program operation; and decommissioning.

  7. Treatment of Berkeley boilers in Studsvik. Project description and experiences - Berkeley Boilers Project

    International Nuclear Information System (INIS)

    Saul, Dave; Davidson, Gavin; Wirendal, Bo

    2014-01-01

    In November 2011 Studsvik was awarded a contract to transport five decommissioned boilers from the Berkeley Nuclear Licensed Site in the UK to the Studsvik Nuclear Site in Sweden for metal treatment and recycling. A key objective of the project was to remove the boilers from the site by 31 March 2012 and this was successfully achieved with all boilers off site by 22 March and delivered to Studsvik on 6 April. In November 2012 Studsvik was awarded a further contract for the remaining ten Berkeley Boilers with the requirement to remove all boilers from the Berkeley site by 31 March 2013. Again this was successfully achieved ahead of programme with all boilers in Sweden by 1 April 2013. A total of nine boilers have now been processed and all remaining boilers will be completed by end of September 2014. The projects have had many challenges including a very tight timescale and both have been successfully delivered to cost and ahead of the baseline programme. This paper describes the project and the experience gained from treatment of the boilers to date. (authors)

  8. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  9. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  10. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  11. Organisational commitment in the era of the new psychological contract

    Directory of Open Access Journals (Sweden)

    Anthonie Theron

    2011-08-01

    Full Text Available The aim of this study was to investigate organisational commitment in an organisation that had recently experienced organisational restructuring (a merger. The psychological contract that exists between employees and organisations is brittle due to many organisational changes that stem from organisational restructuring.  When psychological contracts are breached, employees may experience reduced commitment to the organisation.  The target population for this study consisted of all employees working at three recently-merged higher education institutions in the Nelson Mandela Metropolis (n=100 and a self-administered questionnaire was distributed amongst staff.  The results indicated that an increase in the number of positive human resource management (HRM practices reported by respondents correlated with a decrease in violation and breach of the psychological contract, despite organisational restructuring.  It was further revealed that effective management of the psychological contract is crucial during organisational restructuring, in order to maintain the commitment and loyalty of employees.

  12. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  13. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  14. Polytope Contractions within Weyl Group Symmetries

    Energy Technology Data Exchange (ETDEWEB)

    Szajewska, Marzena, E-mail: m.szajewska@math.uwb.edu.pl [University of Bialystok, Institute of Mathematics (Poland)

    2016-09-15

    A general scheme for constructing polytopes is implemented here specifically for the classes of the most important 3D polytopes, namely those whose vertices are labeled by integers relative to a particular basis, here called the ω-basis. The actual number of non-isomorphic polytopes of the same group has no limit. To put practical bounds on the number of polytopes to consider for each group we limit our consideration to polytopes with dominant point (vertex) that contains only nonnegative integers in ω-basis. A natural place to start the consideration of polytopes from is the generic dominant weight which were all three coordinates are the lowest positive integer numbers. Contraction is a continuous change of one or several coordinates to zero.

  15. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  16. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  17. [Psychological contract in the light of flexible employment: The review of studies].

    Science.gov (United States)

    Żołnierczyk-Zreda, Dorota

    Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  18. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  19. 78 FR 47335 - 60-Day Notice of Proposed Information Collection: Public Housing Contracting With Resident-Owned...

    Science.gov (United States)

    2013-08-05

    ... Information Collection: Public Housing Contracting With Resident-Owned Business--Application Requirements... Contracting with Resident- Owned Businesses/Application Requirements. OMB Approval Number: 2577-0161... with State law; Certification that shows the business is owned by residents, disclosure documents that...

  20. 48 CFR 552.238-78 - Scope of Contract (Eligible Ordering Activities).

    Science.gov (United States)

    2010-10-01

    ... containing information technology Special Item Numbers, and Schedule 84 contracts, on an optional basis... Act of 1937), school districts, colleges and other institutions of higher education, council of...

  1. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  2. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  3. To tender, re-negotiate or partner: Strategies for contracting service companies

    International Nuclear Information System (INIS)

    Gouldie, T.A.

    1994-01-01

    The contracting of oilfield service companies by petroleum exploration and production operating companies is different than the contracting of civil engineering, construction or other project-oriented contractors. The relationship between operating companies and oilfield service companies has had a long and unique history which has evolved since the first oil wells were drilled over a century ago. The process of contracting service companies by operating companies for petroleum exploration and production work can be split into three distinct stages: (1) decide what it is that should be contracted out and what should be kept in house; (2) determine the method to use to select the contractor(s) to perform the work; and (3) agree to the contractual structure to best reflect the relationship the operating company and the service company with to initiate and maintain. As there are ongoing changes to the business structures and corporate thinking of both operating and service companies, there are also evolving changes to what are considered core businesses and the methods of selecting and contracting service companies by operating companies. Operating companies are recognizing the high costs of tendering for contractor services in terms of personnel time and administrative effort, and are relying more on negotiating and rolling-over existing contracts with their suitable, capable contractors. Partnering, in its many forms and levels, is increasingly being recognized as a useful method to get better work done at cheaper overall costs

  4. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  5. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-15

    , international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 932 contracts and agreements were awarded arising of the 1371 contract and agreement proposals received by the Agency during 2001. In 2001, $6,199,104 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $241,901 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6,441,005. The average award per contract was $5,800.

  6. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    International Nuclear Information System (INIS)

    2002-07-01

    , international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 932 contracts and agreements were awarded arising of the 1371 contract and agreement proposals received by the Agency during 2001. In 2001, $6,199,104 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $241,901 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6,441,005. The average award per contract was $5,800

  7. Moral Contract Theory and Social Cognition : An Empirical Perspective

    NARCIS (Netherlands)

    Timmerman, Peter

    2014-01-01

    This interdisciplinary work draws on research from psychology and behavioral economics to evaluate the plausibility of moral contract theory. In a compelling manner with implications for moral theory more broadly, the author’s novel approach resolves a number of key contingencies in contractarianism

  8. 78 FR 65697 - 30-Day Notice of Proposed Information Collection: Public Housing, Contracting With Resident-Owned...

    Science.gov (United States)

    2013-11-01

    ... Information Collection: Public Housing, Contracting With Resident-Owned Businesses--Application Requirements..., Contracting with Resident-Owned Businesses-Application Requirements. OMB Approval Number: 2577-0161. Type of... State law; Certification that shows the business is owned by residents, disclosure documents that...

  9. The 'bankability' of the new waste technologies: an econometric method for risk sharing in private finance waste contracts.

    Science.gov (United States)

    Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J

    2011-12-01

    The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.

  10. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  11. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Science.gov (United States)

    Cooper, N. G.; Shea, N. eds.

    1992-01-01

    This document provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  12. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, N G; Shea, N [eds.

    1992-01-01

    This article provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  13. Isovector pairing effect on the particle-number projection two-proton separation energy

    Energy Technology Data Exchange (ETDEWEB)

    Mokhtari, Djamila; Kerrouchi, Slimane [Laboratoire de Physique Theorique, Faculte de Physique, Algiers (Algeria); Fellah, Mohamed; Allal, Nassima-Hosni [Laboratoire de Physique Theorique, Faculte de Physique, Algiers (Algeria); Centre de Recherche Nucleaire d' Alger, Comena, Algiers (Algeria)

    2009-07-01

    The two-proton separation energy is studied by performing a particle-number projection with and without inclusion of the isovector neutron-proton (np) pairing correlations. It is numerically evaluated for even-even rare-earth nuclei such that the np pairing parameter is non-zero. It is shown that the two-proton separation energy values calculated using the two approaches join, for almost all the considered elements, for the highest values of (N-Z). However, the results including the np pairing correlations are closest to the experimental data when available. Moreover, the two methods lead to the same prediction of the two-proton drip-line position, except for the Dysprosium and the Tungsten.

  14. Managing and sharing the escalating number of sponge "unknowns": the SpongeMaps project.

    Science.gov (United States)

    Hooper, J N A; Hall, K A; Ekins, M; Erpenbeck, D; Wörheide, G; Jolley-Rogers, G

    2013-09-01

    Contemporary collections of sponges in the Indo-west Pacific have escalated substantially due to pharmaceutical discovery, national bioregional planning, and compliance with international conventions on the seabed and its marine genetic resources beyond national jurisdictions. These partially processed operational taxonomic unit (OTU) collections now vastly outweigh the expertise available to make them better "known" via complete taxonomy, yet for many bioregions they represent the most significant body of currently available knowledge. Increasing numbers of cryptic species, previously undetected morphologically, are now being discovered by molecular and chemical analyses. The uncoordinated and fragmented nature of many previous collections, however, means that knowledge and expertise gained from a particular project are often lost to future projects without a biodiversity informatics legacy. Integrating these diverse data (GIS; OTUs; images; molecular, chemical, and other datasets) required a two-way iterative process so far unavailable for sponges with existing biodiversity informatics tools. SpongeMaps arose from the initial need for online collaboration to integrate morphometric data with molecular barcodes, including the Porifera Tree of Life (PorTol) project. It provides interrogation of existing data to better process new collections; capacity to create new OTUs; publication of online pages for individual species, so as to interpret GIS and other data for online biodiversity databases and services; and automatic links to external datasets for taxonomic hierarchy, specimen GIS and mapping, DNA sequence data, chemical structures, and images.

  15. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  16. Bunker purchasing with contracts

    DEFF Research Database (Denmark)

    Plum, Christian Edinger Munk; Neergaard Jensen, Peter; Pisinger, David

    2014-01-01

    The cost for bunker fuel represents a major part of the daily running costs of liner shipping vessels. The vessels, sailing on a fixed roundtrip of ports, can lift bunker at these ports, having differing and fluctuating prices. The stock of bunker on a vessel is subject to a number of operational...... optimally to reduce overall costs. The Bunker Purchasing with Contracts Problem has been formulated as a mixed integer programme, which has been Dantzig-Wolfe decomposed. To solve it, a novel column generation algorithm has been developed. The algorithm has been run on a series of real-world instances...

  17. Rheosensing by impulsive cells at intermediate Reynolds numbers

    Science.gov (United States)

    Mathijssen, Arnold; Bhamla, Saad; Prakash, Manu

    2017-11-01

    For aquatic organisms, mechanical signals are often carried by the surrounding liquid, through viscous and inertial forces. Here we consider a unicellular yet millimetric ciliate, Spirostomum ambiguum, as a model organism to study hydrodynamic sensing. This protist typically swims at moderate Reynolds numbers, Re 100 during impulsive contractions where its elongated body recoils within milliseconds. First, using high-speed PIV and an electrophysiology setup, we deliver controlled voltage pulses to induce these rapid contractions and visualise the vortex flows generated thereby. By comparing these measurements with CFD simulations the range of these hydrodynamic ``signals'' is characterized. Second, we probe the mechano-sensing of the organism with externally applied flows and find a critical shear rate necessary to trigger a contraction. The combination of high Re flow generation and rheosensing could facilitate intercellular communication over large distances. Please also see our other talk ``Collective hydrodynamic communication through ultra-fast contractions''.

  18. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  19. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  20. Contract-program evaluation: Impact of the DRG classification system on hospitals' outputs

    OpenAIRE

    Alves, Helder António Pereira Gomes

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The present work project aims at evaluating the impact of contract-program implementation in 2003 and of incentives created in 2007 on hospital output, under the DRG inpatient classification system. A sample of five Portuguese acute public district hospitals was chosen as sample, between 2002 and 2007. Results of hypothesis testing ...

  1. E-Commerce in Europe - Relevant Law when Concluding a Contract on the Internet

    Czech Academy of Sciences Publication Activity Database

    Matejka, Ján; Štědroň, B.

    2004-01-01

    Roč. 4, č. 1 (2004), s. 45-49 ISSN 1213-4678 R&D Projects: GA AV ČR KJB7068402 Institutional research plan: CEZ:AV0Z7068917 Keywords : e- commerce * contract law * information society Subject RIV: AG - Legal Sciences

  2. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter - September 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-09-01

    In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to 173, with a total estimated nominal capacity of these projects of 922 MW. Of this nominal capacity, about 168 MW is operational, and the balance is under contract for development. Of the 173 signed contracts and committed projects, 61 were cogeneration and solid waste projects with a potential of 643 MW. PG and E also had under active discussion 28 cogeneration projects that could generate a total of 968 MW to 1,049 MW, and 10 solid waste projects with a potential of 90 MW to 95 MW. Wind projects under contract number 84, with a generating capability of 85 MW. Also, discussions are being conducted with 17 wind projects, totaling 83 MW. There are 23 hydroelectric projects with signed contracts and a potential of 95 MW, as well as 63 projects under active discussion for 169 MW. In addition, there are 25 hydroelectric projects, with a nominal capacity of 278 MW, that PG and E is constructing or planning to construct. Five contracts have been signed with projects, using other types of electric power generation, capable of producing 100 MW.

  3. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  4. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  5. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  6. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  7. Government Contracting Should Be a Core Competence for U.S. Military Personnel

    Science.gov (United States)

    2014-12-01

    selves may have distorted the local market , creating inflation problems in the region.65 Thus, long-term projects or services that are to be turned...are injected into the process to avoid rampant single-award-task and-delivery order contracts that effectively inject monopolistic -type pricing

  8. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  9. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    Science.gov (United States)

    2008-01-01

    that could inform such strategic purchasing decisions. 14 We used the unique contract identification number to check for cross -organization...beds, mattresses, dressers , footlockers) Other (stools, rugs, seats, cabinets, tables, folding chairs, paintings) Generators Various power generators

  10. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  11. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  12. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  13. Cogeneration new electric power purchase contract. What is the impact of the new regulation framework approved in december 2002

    International Nuclear Information System (INIS)

    Loffler, P.; Guenaire, M.; Balaguier, Ph.; Haushalter, J.; Fraisse, J.L.; Bernard, L.; Gauthier, J.M.; Tronche, D.; Ravetto, P.

    2003-06-01

    This conference deals with the following topics: the new legal framework and the future contracts evolution, is it possible and interesting to take advantage of the new purchase contract, energy efficiency and technical innovation, the problems of the electric power network integration, the organization of a cogeneration project, experiences examples. (A.L.B.)

  14. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  15. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available   Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  16. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  17. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  18. Numerical modelling of air flow attributes in a contractions chamber

    Czech Academy of Sciences Publication Activity Database

    Michalcová, V.; Kuznetsov, Sergeii; Pospíšil, Stanislav

    2014-01-01

    Roč. 14, č. 2 (2014), s. 11-16 ISSN 1804-4824 R&D Projects: GA ČR(CZ) GA14-12892S; GA MŠk(CZ) LO1219 Keywords : aerodynamics * wind tunnel contraction * CFD Subject RIV: JN - Civil Engineering http://www.degruyter.com/view/j/tvsb.2014.14.issue-2/tvsb-2014-0026/tvsb-2014-0026. xml ?format=INT

  19. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  20. Private participation in infrastructure: A risk analysis of long-term contracts in power sector

    Science.gov (United States)

    Ceran, Nisangul

    The objective of this dissertation is to assess whether the private participation in energy sector through long term contracting, such as Build-Operate-Transfer (BOT) type investments, is an efficient way of promoting efficiency in the economy. To this end; the theoretical literature on the issue is discussed, the experience of several developing countries are examined, and a BOT project, which is undertaken by the Enron company in Turkey, has been studied in depth as a case study. Different risk analysis techniques, including sensitivity and probabilistic risk analysis with the Monte Carlo Simulation (MCS) method have been applied to assess the financial feasibility and risks of the case study project, and to shed light on the level of rent-seeking in the BOT agreements. Although data on rent seeking and corruption is difficult to obtain, the analysis of case study investment using the sensitivity and MCS method provided some information that can be used in assessing the level of rent-seeking in BOT projects. The risk analysis enabled to test the sustainability of the long-term BOT contracts through the analysis of projects financial feasibility with and without the government guarantees in the project. The approach of testing the sustainability of the project under different scenarios is helpful to understand the potential costs and contingent liabilities for the government and project's impact on a country's overall economy. The results of the risk analysis made by the MCS method for the BOT project used as the case study strongly suggest that, the BOT projects does not serve to the interest of the society and transfers substantial amount of public money to the private companies, implying severe governance problems. It is found that not only government but also private sector may be reluctant about full privatization of infrastructure due to several factors such as involvement of large sunk costs, very long time period for returns to be received, political and

  1. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  2. ONRASIA Scientific Information Bulletin. Volume 16, Number 3.

    Science.gov (United States)

    1991-09-01

    techniques to be uti - 2-4-1, [-tamamatsu-cho A contract software company [Fuji lized. The project has been developing Minato-ku, Tokyo 106 Japan...and a pharmacist , CDR Masao Tamaki. The The two DDCs can accommodate one with a Ph.D. degree head of the second research division is up to six divers

  3. Financing the Ranger uranium project

    International Nuclear Information System (INIS)

    Hodge, S.J.; Miskelly, N.

    1983-01-01

    Construction of the Ranger uranium project located 230 km east of Darwin in the Northern Territory commenced in January 1979. Energy Resources of Australia Ltd was incorporated in February 1980 to acquire all the rights in the project. The total cost to ERA of these rights was $407 million. In October 1980 ERA'S cash requirements were estimated to be $553 million. Overseas participants (power utilities who had agreed to purchase uranium yellowcake under contract) arranged to take up 25% of the equity capital, Peko-Wallsend Ltd and EZ Industries Ltd were allotted 30.5% each and 14% was issued to Australian residents. The loan and equity financing arrangements required the successful resolution of many complex and interlocking factors, including technical and economic feasibility, agreement with aboriginal interests, compliance with Government policies and securing of sales contracts

  4. 75 FR 10272 - Notice Regarding 340B Drug Pricing Program-Contract Pharmacy Services

    Science.gov (United States)

    2010-03-05

    ... Regarding 340B Drug Pricing Program--Contract Pharmacy Services AGENCY: Health Resources and Services... drug pricing program by which manufacturers who sell covered outpatient drugs to particular covered... provisions, which had been previously limited to the Alternative Methods Demonstration Project program. FOR...

  5. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  6. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  7. Ifrs Versus Cz Gaap: Influence of Construction Contracts on Financial Indicators

    Directory of Open Access Journals (Sweden)

    Havlová Kristýna

    2015-12-01

    Full Text Available In 2009, 117 countries all over the world allowed to prepare financial statements according to International Financial Reporting Standards (IFRS including the Czech Republic. Between Czech General Accepted Accounting Principles (CZ GAAP and IFRS are some differences involving reporting of noncurrent fixed assets, leasing, construction contracts etc. Using different accounting procedure we can get different value of assets and assets are one component that is used to calculate the financial performance indicators. Those indicators are then used by investors to assess the financial performance of companies and the application of IFRS instead of CZ GAAP can lead to distinct presentation of enterprise performance. In this paper we examine the influence of construction contract reporting using IFRS and CZ GAAP on financial indicators. IFRS leads to more stable development during the period when the project is in progress. In the last year when the project is finished the figures of both ratios (ROA and Z-score are getting worse which is due to the lower percentage of the construction that is built in this year.

  8. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  9. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  10. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  11. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  12. TWRS phase 1 infrastructure project (W-519) characterization

    International Nuclear Information System (INIS)

    Mitchell, C.J.

    1998-01-01

    In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a 'demonstration' site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity

  13. Financing Solar Energy Systems with Energy Savings Performance Contracts in the Federal Sector: Results of a Survey on Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Gee, R. C.; LaPorta, C.

    1999-08-17

    This report summarizes the findings of an investigation into financing solar energy systems for the Federal sector. The objectives of the investigation were (1) to identify the barriers that impede companies from using Energy Savings Performance Contracts (ESPCs) to develop solar energy projects for Federal facilities, and (2) to clarify the impacts of Federal contracting requirements on energy service companies' use of ESPCs. Twenty-four representatives of energy service companies agreed to be interviewed. Their responses indicate that these are the primary barriers to greater use of ESPCs: the relatively long payback periods for investments in solar technologies; the length of the ESPC process; the cost of certain contractual requirements regarding wages and financing; and a lack of knowledge about the actual cost and reliability of solar systems. The report proposes a number of actions the government could take to remove these barriers, including (1) streamlining and shortening the ESPC process and (2) doing more to inform both government agencies and energy service companies about the costs and benefits of solar systems.

  14. Essays on incomplete contracts in regulatory activities

    Science.gov (United States)

    Saavedra, Eduardo Humberto

    that a large number of legal disputes are inhibited by the nonexistence of institutions able to verify and enforce contracts. An in-depth analysis of six cases of open conflict provides support for such a presumption and highlights the crucial role of an adequate market design.

  15. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  16. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  17. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  18. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  19. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  20. Minnesota wood energy scale-up project 1994 establishment cost data

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M. [Oak Ridge National Lab., TN (United States); Pierce, R. [Champion International, Alexandria, MN (United States); Kroll, T. [Minnesota Department of Natural Resources-Forestry, St. Cloud, MN (United States)

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. These extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.

  1. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  2. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  3. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  4. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  5. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  6. Collaborative Workspaces within Distributed Virtual Environments.

    Science.gov (United States)

    1996-12-01

    willingness to listen made the first half of my stay at AFIT a very enjoyable experience. I owe you a trip to Disneyland . Finally, a quackazillion thanks to...the title classification in parentheses. BiockS. Funding Numbers. To include contract and grant numbers; may include program element number(s...project number(s), task number(s), and work unit number(s). Use the following labels: C G PE Contract Grant Program Element PR TA Project

  7. Safety and health education and training of contract workers in nuclear power plants

    International Nuclear Information System (INIS)

    Matsumoto, Akikuni; Hara, Hisayuki; Nawata, Kazumitsu

    2008-01-01

    Nuclear power plants have used many contract workers. Their safety and health conditions are very important in Japan. Several amendments, which deregulate temporary personnel service and employment agency markets, have been done in recent years. The number of contract and temporary help agency workers have been rapidly increasing especially since the 1990s. As a result, ensuring the level of safety and health education and training of workers becomes a serious problem. This paper examines the possibility that the level of safety training of the contract workers is less than that of the direct-hire employees in nuclear power plants. We show that (1) the use of contract workers could be less efficient for ensuring the level of safety training, and (2) nuclear power plants still use contract workers in some situations in spite of the loss of efficiency. We also study legislations and past cases relating to nuclear power generation. We find that there are some structural problems that might make the contract workers less trained. (author)

  8. Right to property, inheritance, and contract and persons with mental illness.

    Science.gov (United States)

    Bhugra, Dinesh; Pathare, Soumitra; Joshi, Rajlaxmi; Nardodkar, Renuka; Torales, Julio; Tolentino, Edgardo Juan L; Dantas, Rubens; Ventriglio, Antonio

    2016-08-01

    Discrimination against people with mental illness is rife across the globe. Among different types of discrimination is the policy in many countries where persons with mental illness are forbidden to inherit property, and they are not able to enter into a contract in a large number of countries. Using various databases, legislations dealing with law of contract, law of succession/inheritance, and law relating to testamentary capacity (wills) of all UN Member states (193 countries) were studied. With respect to federal countries, the laws of the most populous state as a representative state in the respective country were studied. Only 40 Member States (21%) recognize/allow persons with mental health problems to enter into contracts. Of these, however, only 16 Member States (9%) recognize the right of persons with mental health problems to enter into a contract without any restrictions. The remaining 24 Member States (12%) allow a contract entered into by a person with mental health problems to be invalidated under certain conditions. These countries also make the validity of the contract subject to the capacity to consent or based on the level of understanding of the person with mental health problems. They may allow persons with mental health problems to enter into contracts only for transactions of an insignificant nature or of personal rights. Only 9% of the countries allow people with mental illness to enter into contracts in an unrestricted way. Furthermore, there remain variations between high income and low income states. In spite of international laws in many countries, laws remain discriminatory.

  9. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    Science.gov (United States)

    2016-08-30

    Sea Systems issue guidance to contracting officers to obtain a quality assurance surveillance plan for all service contracts, and ensure that the...prepare a quality assurance surveillance plan (QASP) for service contracts in order to facilitate assessment of contractor performance.12 Furthermore...that the contracting activities received and paid for goods or services that did not meet contract performance standards. At the time of the audit

  10. Mrica Hydroelectric Project: a study in partnering

    International Nuclear Information System (INIS)

    Loraine, R.K.; Bannmark, O.

    1993-01-01

    This paper describes the contractual and financial aspects of the Mrica Project. Of particular interest is the high degree of cooperation that developed between the various parties, and the effect this had on the progress and completion of the project. This relationship had its origin in the need to make the best use of the relatively scarce funds available. It was vitally important that problems were solved jointly and that costs did not escalate as a result of confrontation between the parties. In this respect, the project was an early manifestation of the contractual relationship now called partnering, and the procedures adopted at Mrica are very similar to those now widely used in partnering contracts. The paper is therefore structured to identify and analyse the key elements of co-operation, and their impact on both the negotiation of the contracts and the completion of the works. (Author)

  11. Residential energy contracts and the 28 day rule

    International Nuclear Information System (INIS)

    Littlechild, Stephen

    2006-01-01

    What measures are needed to protect customers when a utility market is first opened to competition? In the UK, residential (domestic) customers must be able to terminate energy contracts at 28 days' notice. This rule was introduced as a transitional protection for customers and for competition. However, the regulatory justification for the rule seems to have evolved over time. Removing the rule could have a number of advantages, including the development of fixed-price fixed-term contracts. The advantages of retaining the rule are questionable. In other retail sectors there is no regulatory concern or requirement of this kind. UK electricity suppliers have begun to offer capped prices for specified periods of time, suggesting that there is a growing customer demand for this. Fixed-price fixed-term contracts are a common form of competition in Scandinavia. The 28 day rule no longer seems necessary to protect customers and is more likely to distort than to protect competition. In retrospect, it would have been preferable not to introduce the rule in the first place. (author)

  12. Essence of Time in Construction Contracts

    Directory of Open Access Journals (Sweden)

    Tony Lim

    2012-11-01

    Full Text Available The building industry has in recent years seen huge costs incurreddue to disputes arising on notice requirement clauses. Theseclaims could have been averted if the parties had been diligent inproviding the necessary notices. This article sets out to explorethe law briefl y as interpreted by the courts in common law andequity and discuss the possibility of defence under the principle ofpromissory estoppel. More importantly it also shares the author’sview on how such pitfalls could have been prevented by givingthe proper notices within the timeline required by the contractconditions. It cannot be emphasised enough that contractorswould be wise to comply strictly with the notice provisions in thecontract instead of relying on the estoppel principle or waiver orunconscionability to save their day. Notice clauses essentiallyrequire a competent contracts administrator to follow the time lineprovided in the contract conditions and would be most effective ifthe project team worked closely with the contracts administratorto ensure that proper notices are given when directions orinstructions are received. Although it is common to see noticeclauses which make it a condition precedent for a contractor to beentitled to claim for an extension of time or loss and expense claimbeing interpreted restrictively, in any litigation or arbitration it isalways diffi cult to predict how the courts or tribunal would be willingto uphold such notice clause. It is therefore in the interest of theparties that notice clauses should be properly observed. Suffi ceto say, failure to comply with a notice clause and time bar may befatal to a claim.

  13. Extending Security-by-Contract with Quantitative Trust on Mobile Devices

    DEFF Research Database (Denmark)

    Costa, Gabriele; Dragoni, Nicola; Lazouski, Aliaksandr

    2010-01-01

    program our architecture updates the trust level associated with the contract provider. We also present a possible application of our framework in the scenario of a mobile application marketplace, e.g., Apple AppStore, Cydia, Android Market, that, nowadays, are considered as one of the most attractive e......Security-by-Contract (S×C) is a paradigm providing security assurances for mobile applications. In this work, we present the an extension of S×C, called Security-by-Contract-with-Trust (S×C×T). Indeed, we enrich the S×C architecture by integrating a trust model and adding new modules......-commerce activity for both mobile application developers and industries of mobile devices. Since the number of applications increases, Mobile Applications Marketplace (MAMp) sets up recommendation systems that rank and highlight mobile applications by category, social activity, etc. The S×C×T framework we propose...

  14. Simulation of a chain of collapsible contracting lymphangions with progressive valve closure.

    Science.gov (United States)

    Bertram, C D; Macaskill, C; Moore, J E

    2011-01-01

    The aim of this investigation was to achieve the first step toward a comprehensive model of the lymphatic system. A numerical model has been constructed of a lymphatic vessel, consisting of a short series chain of contractile segments (lymphangions) and of intersegmental valves. The changing diameter of a segment governs the difference between the flows through inlet and outlet valves and is itself governed by a balance between transmural pressure and passive and active wall properties. The compliance of segments is maximal at intermediate diameters and decreases when the segments are subject to greatly positive or negative transmural pressure. Fluid flow is the result of time-varying active contraction causing diameter to reduce and is limited by segmental viscous and valvular resistance. The valves effect a smooth transition from low forward-flow resistance to high backflow resistance. Contraction occurs sequentially in successive lymphangions in the forward-flow direction. The behavior of chains of one to five lymphangions was investigated by means of pump function curves, with variation of valve opening parameters, maximum contractility, lymphangion size gradation, number of lymphangions, and phase delay between adjacent lymphangion contractions. The model was reasonably robust numerically, with mean flow-rate generally reducing as adverse pressure was increased. Sequential contraction was found to be much more efficient than synchronized contraction. At the highest adverse pressures, pumping failed by one of two mechanisms, depending on parameter settings: either mean leakback flow exceeded forward pumping or contraction failed to open the lymphangion outlet valve. Maximum pressure and maximum flow-rate were both sensitive to the contractile state; maximum pressure was also determined by the number of lymphangions in series. Maximum flow-rate was highly sensitive to the transmural pressure experienced by the most upstream lymphangions, suggesting that many

  15. The CISG Convention and Domestic Contract Law: Harmony, Cross-Inspiration, or Discord?

    DEFF Research Database (Denmark)

    The papers prepared by outstanding Nordic and International scholars in this volume cast new light on the interrelationship between key features of the United Nations Convention on Contracts for the International Sale of Goods (CISG) and domestic sales and contract law. The Nordic region has...... a special interest is this project, as 2014 marks the 25th anniversary of the ratification of the CISG in most of the Nordic Countries. But the interaction between the CISG and domestic law is not merely a Scandinavian concern. CISG Article 7 expressly requires that in the interpretation of CISG, “regard...... is to be had to its international character and to the need to promote uniformity in its application”. With particular emphasis on issues relating to Contract Formation, Conformity of Goods and Hardship, the authors discuss how CISG rules and principles impact on or are influenced by domestic sales...

  16. Procurement Fraud: A Knowledge-Level Analysis of Contracting Personnel

    Science.gov (United States)

    2014-12-01

    goods and services for cheaper or substandard merchandise that does not conform to contract specifications. This process is also known as product...11 shows a visual depiction of these results. 48 Figure II . Number of Prut icipants by W aiTant Status C. ANALYSIS OF KNOWLEDGE QUESTIONS There

  17. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  18. Automatic Conflict Detection on Contracts

    Science.gov (United States)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  19. A number-projected model with generalized pairing interaction in application to rotating nuclei

    Energy Technology Data Exchange (ETDEWEB)

    Satula, W. [Warsaw Univ. (Poland)]|[Joint Institute for Heavy Ion Research, Oak Ridge, TN (United States)]|[Univ. of Tennessee, Knoxville, TN (United States)]|[Royal Institute of Technology, Stockholm (Sweden); Wyss, R. [Royal Institute of Technology, Stockholm (Sweden)

    1996-12-31

    A cranked mean-field model that takes into account both T=1 and T=0 pairing interactions is presented. The like-particle pairing interaction is described by means of a standard seniority force. The neutron-proton channel includes simultaneously correlations among particles moving in time reversed orbits (T=1) and identical orbits (T=0). The coupling between different pairing channels and nuclear rotation is taken into account selfconsistently. Approximate number-projection is included by means of the Lipkin-Nogami method. The transitions between different pairing phases are discussed as a function of neutron/proton excess, T{sub z}, and rotational frequency, {Dirac_h}{omega}.

  20. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...