WorldWideScience

Sample records for project completion act

  1. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  2. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  3. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  4. 1998 BPA habitat projects completed within the Asotin Creek Watershed, WA; Ridge-Top to Ridge-Top Habitat Projects; 1998 BPA Completion Report - November 1999

    International Nuclear Information System (INIS)

    Johnson, Bradley J.

    2000-01-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed

  5. Habitat Projects Completed within the Asotin Creek Watershed, 1999 Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Bradley J.

    2000-01-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority in southeastern WA. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred seventy-six projects have been implemented through the ACMWP as of 1999. Twenty of these projects were funded in part through Bonneville Power Administration's 1999 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; thirty-eight were created with these structures. Three miles of stream benefited from riparian improvements such as vegetative plantings (17,000 trees and shrubs) and noxious weed control. Two sediment basin constructions, 67 acres of grass seeding, and seven hundred forty-five acres of minimum till were implemented to reduce sediment production and delivery to streams in the watershed.

  6. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  7. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  8. Complete electronics self-teaching guide with projects

    CERN Document Server

    Boysen, Earl

    2012-01-01

    An all-in-one resource on everything electronics-related! For almost 30 years, this book has been a classic text for electronics enthusiasts. Now completely updated for today's technology, this latest version combines concepts, self-tests, and hands-on projects to offer you a completely repackaged and revised resource. This unique self-teaching guide features easy-to-understand explanations that are presented in a user-friendly format to help you learn the essentials you need to work with electronic circuits. All you need is a general understanding of electronics concepts such as Oh

  9. Treatment-completion rates with olanzapine long-acting injection versus risperidone long-acting injection in a 12-month, open-label treatment of schizophrenia: indirect, exploratory comparisons

    Directory of Open Access Journals (Sweden)

    Ascher-Svanum H

    2012-05-01

    Full Text Available Haya Ascher-Svanum1, William S Montgomery2, David P McDonnell3, Kristina A Coleman4, Peter D Feldman11Lilly Research Laboratories, Eli Lilly and Company, Indianapolis, IN, USA; 2Eli Lilly Australia Pty Ltd, West Ryde, New South Wales, Australia; 3Eli Lilly and Company, Cork, Ireland; 4OptumInsight, Lilyfield, New South Wales, AustraliaBackground: Little is known about the comparative effectiveness of atypical antipsychotics in long-acting injection formulation. Due to the absence of head-to-head studies comparing olanzapine long-acting injection and risperidone long-acting injection, this study was intended to make exploratory, indirect, cross-study comparisons between the long-acting formulations of these two atypical antipsychotics in their effectiveness in treating patients with schizophrenia.Methods: Indirect, cross-study comparisons between olanzapine long-acting injection and risperidone long-acting injection used 12-month treatment-completion rates, because discontinuation of an antipsychotic for any cause is a recognized proxy measure of the medication's effectiveness in treating schizophrenia. Following a systematic review of the literature, two indirect comparisons were conducted using open-label, single-cohort studies in which subjects were stabilized on an antipsychotic medication before depot initiation. The first analysis compared olanzapine long-acting injection (one study with pooled data from nine identified risperidone long-acting injection studies. The second analysis was a “sensitivity analysis,” using only the most similar studies, one for olanzapine long-acting injection and one for risperidone long-acting injection, which shared near-identical study designs and involved study cohorts with near-identical patient characteristics. Pearson Chi-square tests assessed group differences on treatment-completion rates.Results: Comparison of olanzapine long-acting injection data (931 patients with the pooled data from the nine

  10. Projective modules and complete intersections

    CERN Document Server

    Mandal, Satya

    1997-01-01

    In these notes on "Projective Modules and Complete Intersections" an account on the recent developments in research on this subject is presented. The author's preference for the technique of Patching isotopic isomorphisms due to Quillen, formalized by Plumsted, over the techniques of elementary matrices is evident here. The treatment of Basic Element theory here incorporates Plumstead's idea of the "generalized dimension functions". These notes are highly selfcontained and should be accessible to any graduate student in commutative algebra or algebraic geometry. They include fully self-contained presentations of the theorems of Ferrand-Szpiro, Cowsik-Nori and the techniques of Lindel.

  11. American Recovery and Reinvestment Act: Clean Cities Project Awards

    Energy Technology Data Exchange (ETDEWEB)

    2016-08-01

    Each Clean Cities project award under the American Recovery and Reinvestment Act included a diverse group of stakeholders who worked together to lay the foundation for their communities to adopt alternative fuels and petroleum reduction strategies. This document provides a snapshot of the impact of each project and highlights the partners and Clean Cities coalitions who helped transform local and regional transportation markets through 25 projects impacting 45 states.

  12. Summary of the evidence file demonstrating completion of the NIF Project Completion Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Haynam, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-04

    This document summarizes the results of performance verification tests on NIF that demonstrate it has met its performance-related Project Completion Criteria (PCC). It includes measurements made on NIF with the NIF diagnostics, the calibration of these diagnostics and the supporting analyses that verify the NIF performance criteria have been met.

  13. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  14. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  15. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  16. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  17. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  18. Recovery Act Hospital Alteration Project at Naval Air Station Jacksonville

    Science.gov (United States)

    2010-12-07

    QMAD Quantitative Methods and Analysis Division RLF Rogers Lovelock & Fritz, Incorporated SE Southeast SF Square Feet SOW Statement of Work TMA TRICARE...Finally, the contractor, Rogers Lovelock & Fritz, Incorporated, reported the recipient information required by the Recovery Act. What We Recommend...contractor, Rogers Lovelock & Fritz, Incorporated (RLF), reported the recipient information required by the Recovery Act. Planning: Initially, Project

  19. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  20. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  1. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  2. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  3. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  4. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  5. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  6. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  7. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  8. Chesapeake Bay Impact Structure Deep Drilling Project Completes Coring

    Directory of Open Access Journals (Sweden)

    the Scientific Staff of the Chesapeake Bay Impact Structure Deep Drilling Project

    2006-09-01

    Full Text Available The Chesapeake Bay Impact Structure Deep Drilling Project (CBIS Project completed its coring operations during September–December 2005 and April–May 2006. Cores were collected continuously to a total depth of 1766 m. The recovered section consists of 1322 m of impactites beneath 444 m of post-impact continental shelf sediments.The CBIS Project is a joint venture of the International Continental Scientifi c Drilling Program (ICDP and the U.S. Geological Survey (USGS. Project activities began with a planning workshop in September 2003 attended by sixtythree scientists from ten countries. Field operations began with site preparation in July 2005, and coring began in September 2005. Drilling, Observation and Sampling of theEarth’s Continental Crust (DOSECC was the general contractor for the drilling operations throughout 2005.

  9. "A Completely New Approach" to Indigenous Cultural Heritage: Evaluating the Queensland Aboriginal Cultural Heritage Act

    Directory of Open Access Journals (Sweden)

    Mark E. O'Neill

    2018-01-01

    Full Text Available The Aboriginal Cultural Heritage Act 2003 challenged the hegemony that Western, archaeological methodologies has held over Indigenous cultural heritage in Australia. By choosing to relinquish state control and authority over cultural heritage in favour of the expertise of Indigenous people, the Act created a unique and innovative heritage policy. Over the 10 years the Act has been in force, it has seen a variety of approaches adopted as part of myriad projects. This has created a mature field of practice for investigation and analysis. This article examines and critiques the Act to determine its successes and weaknesses. In doing so, it offers opportunities for other policy-makers to consider as part of policy review.

  10. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  11. Modeling Change in Project Duration and Completion

    DEFF Research Database (Denmark)

    Wiltshire, Travis; Butner, Jonathan E.; Pirtle, Zachary

    2017-01-01

    In complex work domains and organizations, understanding scheduleing dynamics can ensure objectives are reached and delays are mitigated. In the current paper, we examine the scheduling dynamics for NASA’s Exploration Flight Test 1 (EFT-1) activities. For this examination, we specifically modeled...... simultaneous change in percent complete and estimated duration for a given project as they were included in monthly reports over time. In short, we utilized latent change score mixture modeling to extract the attractor dynamics within the scheduling data. We found three primarily patterns: an attractor at low...

  12. 24 CFR 213.256 - Premiums; insurance upon completion.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Premiums; insurance upon completion... HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES COOPERATIVE HOUSING MORTGAGE INSURANCE Contract Rights and Obligations-Projects § 213.256 Premiums...

  13. The effects of Project ALERT one year past curriculum completion.

    Science.gov (United States)

    Ringwalt, Chris L; Clark, Heddy Kovach; Hanley, Sean; Shamblen, Stephen R; Flewelling, Robert L

    2010-06-01

    School-based drug prevention curricula constitute the nation's most prevalent strategy to prevent adolescent drug use. We evaluated the effects of one such curriculum, Project ALERT, on adolescent substance use. In particular, we sought to determine if a single effect on 30-day alcohol use, noted shortly following the completion of the 2-year program, could be detected 1 year later. We also looked for delayed effects on other outcomes of interest, namely lifetime alcohol use, and 30-day and lifetime use of cigarettes, marijuana, and inhalants. We employed a randomized controlled trial that used school as the unit of assignment. Thirty-four schools with grades 6-8 from 11 states completed the study. Seventy-one Project ALERT instructors taught 11 core lessons to sixth graders and 3 booster lessons to seventh graders. Students were assessed prior to the onset of the intervention, as sixth graders, after the completion of the 2-year curriculum, as seventh graders, and again 1 year later as eighth graders. This paper examines data from the pretest and final posttest. Using hierarchical nonlinear modeling, we found that our earlier effect on 30-day alcohol use did not persist. Further, we continued to find no effects for lifetime alcohol use and both the lifetime and 30-day use of cigarettes, marijuana, and inhalants. Our findings do not support the long-term effectiveness of Project ALERT, when delivered to sixth graders.

  14. Budgetary Approach to Project Management by Percentage of Completion Method

    Directory of Open Access Journals (Sweden)

    Leszek Borowiec

    2011-07-01

    Full Text Available Efficient and effective project management process is made possible by the use of methods and techniques of project management. The aim of this paper is to present the problems of project management by using Percentage of Completion method. The research material was gathered based on the experience in implementing this method by the Johnson Controls International Company. The article attempts to demonstrate the validity of the thesis that the POC project management method, allows for effective implementation and monitoring of the project and thus is an effective tool in the managing of companies which exploit the budgetary approach. The study presents planning process of basic parameters affecting the effectiveness of the project (such as costs, revenue, margin and characterized how the primary measurements used to evaluate it. The present theme is illustrating by numerous examples for showing the essence of the raised problems and the results are presenting by using descriptive methods, graphical and tabular.

  15. A Review of the American Recovery and Reinvestment Act Smart Grid Projects and Their Implications for China

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Feng, Wei [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Zhou, Nan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Karali, Nihan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-06-21

    The Chinese government has paid growing attention to renewable energy development and has set ambitious goals for carbon dioxide (CO2) emissions reduction and energy savings. Smart grid (SG) technologies have been regarded as emerging ways to integrate renewable energy and to help achieve these climate and energy goals. This report first reviews completed SG demonstrations under the U.S. American Recovery and Reinvestment Act (ARRA); especially two key programs: the SG Investment Grant (SGIG) and the SG Demonstration Project (SGDP). Under the SGIG, the larger of the two programs, over $3.4 billion was used to help industry deploy existing advanced SG technologies and tools to improve grid performance and reduce costs. Including industry investment, a total of $8 billion was spent on 99 cost-shared projects, which involved more than 200 participating electric utilities and other organizations. These projects aimed to modernize the electric grid, strengthen cyber security, improve interoperability, and collect comprehensive data on SG operations and benefits.

  16. Predicting Long-Term College Success through Degree Completion Using ACT[R] Composite Score, ACT Benchmarks, and High School Grade Point Average. ACT Research Report Series, 2012 (5)

    Science.gov (United States)

    Radunzel, Justine; Noble, Julie

    2012-01-01

    This study compared the effectiveness of ACT[R] Composite score and high school grade point average (HSGPA) for predicting long-term college success. Outcomes included annual progress towards a degree (based on cumulative credit-bearing hours earned), degree completion, and cumulative grade point average (GPA) at 150% of normal time to degree…

  17. [Doctoral thesis projects for medical students? Retrospective estimation of the fraction of successfully completed medical doctoral thesis projects at Witten/Herdecke University].

    Science.gov (United States)

    Scharfenberg, Janna; Schaper, Katharina; Krummenauer, Frank

    2014-01-01

    The German "Dr med" plays a specific role in doctoral thesis settings since students may start the underlying doctoral project during their studies at medical school. If a Medical Faculty principally encourages this approach, then it should support the students in performing the respective projects as efficiently as possible. Consequently, it must be ensured that students are able to implement and complete a doctoral project in parallel to their studies. As a characteristic efficiency feature of these "Dr med" initiatives, the proportion of doctoral projects successfully completed shortly after graduating from medical school is proposed and illustrated. The proposed characteristic can be estimated by the time period between the state examination (date of completion of the qualifying medical examination) and the doctoral examination. Completion of the doctoral project "during their medical studies" was then characterised by a doctoral examination no later than 12 months after the qualifying medical state examination. To illustrate the estimation and interpretation of this characteristic, it was retrospectively estimated on the basis of the full sample of all doctorates successfully completed between July 2009 and June 2012 at the Department of Human Medicine at the Faculty of Health of the University of Witten/Herdecke. During the period of investigation defined, a total number of 56 doctoral examinations were documented, 30 % of which were completed within 12 months after the qualifying medical state examination (95% confidence interval 19 to 44 %). The median duration between state and doctoral examination was 27 months. The proportion of doctoral projects completed parallel to the medical studies increased during the investigation period from 14 % in the first year (July 2009 till June 2010) to 40 % in the third year (July 2011 till June 2012). Only about a third of all "Dr med" projects at the Witten/Herdecke Faculty of Health were completed during or close to

  18. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  19. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  20. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  1. Response of loblolly pine to complete woody and herbaceous control: projected yields and economic outcomes - the COMProject

    Science.gov (United States)

    James H. Miller; R.L. Busby; B.R. Zutter; S.M. Zedaker; M.B. Edwards; R.A. Newbold

    1995-01-01

    Abstract.Age-8 and -9 data from the 13 study plantations of the Competition Omission Monitoring Project (COMP) were used to project yields and derive economic outcomes for loblolly pine (Pinus taeda L.). COMP treatments were chop-burn, complete woody plant control, complete herbaceous plant control for 4 years, and complete woody...

  2. Report: Response to Congressional Request on Signage Requirements for Projects Funded by the Recovery Act

    Science.gov (United States)

    Report #10-X-0175, August 2, 2010. EPA developed two forms of guidance that discuss the need for recipients to display a Recovery Act logo to communicate to the public that the project is a Recovery Act investment.

  3. MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).

    Science.gov (United States)

    Johnson, J; Brown, K; Ibbott, G; Pawlicki, T

    2012-06-01

    Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.

  4. [Research progresses of the completed pediatrics projects funded by National Natural Science Foundation of China from 2002 to 2006].

    Science.gov (United States)

    Xu, Ling; Hao, Jie; Deng, Min; Xu, Yan-ying

    2009-05-01

    To understand the projects completion and research progresses in pediatrics which were funded by the National Natural Science Foundation of China (NSFC), and evaluate the accomplishment objectively and justly. The completion status of projects in pediatrics funded by department of clinical medicine II from 2002 to 2006 was analysed retrospectively, and important research achievement and outstanding development in some projects were reported. During the period between 2002 and 2006, 420 articles were published, and the average was 8.1 papers per project, which included 56 papers that were published in journals indexed by SCI (the average was 1.1 papers per project). The completion of general project was better than that of "the Young Researchers Fund" and small grant project. Ten post-doctors, 102 doctors and 109 masters were trained. Two projects were awarded with the first grade prize and another 2 with the second grade prize at the provincial and ministerial level, 4 items applied for patent and 1 was granted. These completed projects, which were mainly related to 7 of 12 subspecialties in the field of pediatrics, such as the respiratory disease, nephrology, neurology, cardiology, endocrinology, hematology, neonatology, are the major portion of the application projects and subsidized projects funded by NSFC, and achieved great research progresses. During the period between 2002 and 2006, the 52 completed projects in pediatrics showed difference in the distribution and quality of accomplishment among subspecialties and among types of supported projects; there are some gaps between pediatrics and some other clinical basic subspecialties II, this situation released the research status and problems in development of pediatrics in China. The general projects completion was good, and many projects obtained research achievements, which reflect the leading function of NSFC in pediatric research.

  5. Completion of Mochovce 1 and 2 nuclear power plant project

    International Nuclear Information System (INIS)

    Valach, J.

    2000-01-01

    Commissioning of the Mochovce Nuclear Power Plant unit 2 fully completed the Mochovce unit 1 and 2 project. The power plant construction passed through a complicated evolution since early 80's. The genesis started with the change of the plant location due to a seismic resistance requirement raised by the former Czechoslovak Atomic Energy Commission, change of the design and contractor of the Instrumentation and Control system in early 90's, halt of construction in 1993 till 1996 due to a lack of funding, as well as a series of international reviews of safety aspects. All the obstacles had been overcome in the end, and completion works were re-started in 1996. Looking back to the unit 1 and 2 completion project, I would like to highlight some aspects of the project, particularly the level of safety, technical and organisational conditions, and terms of funding. The most important argument for completion of the plant was that VVER 440/213 reactor units were distinguished with very high level of passive safety, even overcoming Western-type PWR's in some aspects. The replacement of the original I and C system was another important contribution to the initial level of safety. International safety reviews performed at Mochovce NPP between 1990 and 1995 (Siemens, EdF, IAEA, RlSKAUDIT) confirmed the high level of safety of VVER 440/213 reactors, however, pointed out at some safety issues which had not been dealt with in the design. Those included e.g. the 'external risks', primary-to-secondary leaks, qualification of pressurizer safety valves, and others. It is necessary to stress that the Safety Improvement Programme defined for Mochovce NPP to comply with international standards did not become the most important part of the completion project due to external pressures, but based on natural requirements on nuclear power plant safety level generally accepted in 90's. The good example could be the seismic resistance of the plant which, though designed as seismic resistant

  6. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  7. Completion of the uranium mill tailings remedial project and cleanup of the former mill site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Rael, G.J.; Cox, S.W.; Artiglia, E.W.

    2000-01-01

    The United States Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Surface Project has successfully completed the cleanup of 22 former uranium mill sites, more than 5400 vicinity properties, and has constructed 18 entombment cells. The Project has recently received the United States Nuclear Regulatory Commission's approval and certification for the last two disposal sites, with these sites being placed under the general license for long term custodial care of residual radioactive material. The UMTRA site located at Grand Junction, Colorado is a good example of the technical, political, economic, and public relations challenges that were overcome in achieving success. The UMTRA Team discussed, negotiated, planned, and eventually acted on this uranium mill tailings problem and brought the project to a successful conclusion for the community. From the early 1940s through the 1970s, uranium ore was mined in significant quantities under United States federal contracts for the government's national defence programmes, i.e. the Manhattan Engineering District and Atomic Energy Commission programmes. The problem started as the need for uranium decreased in the late 1960s, resulting in mills shutting down, leaving behind large quantities of process waste tailings and contaminated mill buildings. The former Climax Uranium Company mill site in Grand Junction was one of the largest of these sites. (author)

  8. Digital project management the complete step-by-step guide to a successful launch

    CERN Document Server

    Olson, Taylor

    2016-01-01

    The digital world is growing and changing at a rate that can seem overwhelming to those project managers who have to keep up with it to build customer-facing solutions and applications. It's rare for project managers working in this field to be provided with much direction or a process by which to carry out a project, and there has been next to nothing available specific to these types of projects in the literary marketplace. Digital Project Management: The Complete Step-by-Step Guide to a Successful Launch was developed to fill this gap by providing the knowledge, best practices and proven steps to consistently managing these types of project successfully from end-to-end now, and in the future with just minor adjustments to adapt to changes in technology.

  9. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Science.gov (United States)

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  10. Analysis of the impact of the Dutch Heat Act on projects and an inventory of stakeholders

    International Nuclear Information System (INIS)

    Budding, B.; Gerrits, W.; Grootscholten, C.

    2010-08-01

    The Dutch Heat Act was adopted by the Dutch Lower Chamber in February 2009. The main aim of the Act is reliable delivery of heat at reasonable prices and conditions to protect the consumer. The Dutch Ministry of Economic Affairs commissioned a study on the effect of the Heat Act on investment decisions for new heat projects, encompassing a quantitative and a qualitative assessment. [nl

  11. 75 FR 12562 - Central Utah Project Completion Act

    Science.gov (United States)

    2010-03-16

    ...-- Water and Science; Utah Reclamation Mitigation and Conservation Commission; and the Central Utah Water... Commission (Mitigation Commission), and the Central Utah Water Conservancy District (District), as Joint Lead... Diamond Fork System Final Supplement to the Diamond Fork Power System Final Environmental Impact Statement...

  12. 75 FR 8393 - Central Utah Project Completion Act

    Science.gov (United States)

    2010-02-24

    ... infiltration pipelines to recharge water to the groundwater basin at other times. These actions are proposed to..., Office of the Assistant Secretary-- Water and Science. ACTION: Notice of Availability of the Finding of No Significant Impact associated with the Environmental Assessment for the East Juab Water Efficiency...

  13. Improving completion rates in adult education through social responsibility

    DEFF Research Database (Denmark)

    Wahlgren, Bjarne; Mariager-Anderson, Kristina

    2017-01-01

    Dropout is a serious problem within education. This article reports on an intervention project, titled “New Roles for the Teacher—Increased Completion Rates Through Social Responsibility,” which sought to reduce nonattendance and dropout rates in the Danish adult educational system by improving...... of reducing drop-out rates. As a consequence, the teachers acted more consistently and purposefully to prevent dropout, and a positive effect of the intervention on drop-out rates was documented....

  14. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  15. Federal Advisory Committee Act (FACA) Database-Complete-Raw

    Data.gov (United States)

    General Services Administration — The Federal Advisory Committee Act (FACA) database is used by Federal agencies to continuously manage an average of 1,000 advisory committees government-wide. This...

  16. Developing a Complete and Effective ACT-R Architecture

    National Research Council Canada - National Science Library

    Anderson, John R; Lebiere, Christian

    2008-01-01

    The Carnegie Mellon University team focused on extending their current cognitive architecture, ACT-R, to show how visual imagery, language, emotion and meta-cognition affect learning, memory, and reasoning...

  17. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Science.gov (United States)

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  18. Quality improvement training for core medical and general practice trainees: a pilot study of project participation, completion and journal publication.

    Science.gov (United States)

    McNab, Duncan; McKay, John; Bowie, Paul

    2015-11-01

    Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be

  19. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    K. Kolesnikova

    2017-06-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  20. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    Katerina Kolesikova

    2017-05-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  1. Special Appropriation Act Projects

    Science.gov (United States)

    EPA is sometimes directed to provide funding to a specific entity for study, purpose, or activity.This information will be of interest to a community or other entity that has been identified in one of EPA's appropriations acts to receive such funding.

  2. Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis

    Energy Technology Data Exchange (ETDEWEB)

    Dettmers, Dana Lee; Eide, Steven Arvid

    2002-10-01

    An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

  3. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Science.gov (United States)

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  4. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  5. "Project ACTS": An Intervention to Increase Organ and Tissue Donation Intentions among African Americans

    Science.gov (United States)

    Arriola, Kimberly; Robinson, Dana H.; Thompson, Nancy J.; Perryman, Jennie P.

    2010-01-01

    This study sought to evaluate the effectiveness of "Project ACTS: About Choices in Transplantation and Sharing," which was developed to increase readiness for organ and tissue donation among African American adults. Nine churches (N = 425 participants) were randomly assigned to receive donation education materials currently available to consumers…

  6. Project WAGR: The UK demonstration project for power reactor decommissioning - removing the core and looking to completion

    International Nuclear Information System (INIS)

    Benest, T. G.

    2003-01-01

    delivered the required performance. In such cases, simple tooling and manual intervention have been adopted to maintain the project ahead of programme and below the dose budget. For campaigns where manual intervention was precluded by high dose rates, the contractor has undertaken a risk assessment of each task and elected to develop a number of different tools to cover the most likely risks. Although this strategy incurs costs for tools that may never be utilised, these costs are dwarfed by the project costs of potential delays. Excellent progress has been maintained throughout the remote dismantling with the reliability of the equipment and the experience of the workforce being major contributors to the success. Management arrangements have also contributed to the current excellent programme position. The close working relationship between UKAEA and their prime contractor, and management of the interfaces with the regulators, has enabled problems to be identified early and then dealt with quickly and effectively. The current phase of operations is now planned for completion in early 2005 over 18 months ahead of programme. Currently the WAGR project has operated for over 6 years without a lost time accident to either UKAEA staff or any of the contractor's operatives. In the last 12 months, the maximum radiation dose to an individual was <1.0 mSv. To date, 270 tonnes of graphite and 206 tonnes of steel have been encapsulated. 38 boxes of low level waste have been sent, or are awaiting transport, to BNFL's Drigg site for disposal, and a further 102 boxes of ILW are now stored on-site pending the availability of a national facility. Thus far the UKAEA WAGR project is well ahead of programme, achieving all its objectives and demonstrating to a world-wide audience that a power reactor can be decommissioned safely and efficiently shortly after shutdown

  7. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    Rick Findlay

    2006-01-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  8. Savage Island Project borehole completion report

    International Nuclear Information System (INIS)

    Chamness, M.A.; Gilmore, T.J.; Teel, S.S.

    1993-02-01

    This report discusses three wells which were drilled in 1990 and 1991 in support of Pacific Northwest Laboratory's Ground-Water surveillance Project. These wells were intended to monitor the Rattlesnake Ridge interbed aquifer and the deeper portion of the unconfined aquifer to determine whether ground-water contamination emanating from the Hanford Site was migrating offsite through these aquifers. This report discusses well construction, lithologies encountered, and other data collected during drilling. At least three reports have been or are being prepared to discuss the results of this well monitoring project

  9. Lessons from comparative effectiveness research methods development projects funded under the Recovery Act.

    Science.gov (United States)

    Zurovac, Jelena; Esposito, Dominick

    2014-11-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) directed nearly US$29.2 million to comparative effectiveness research (CER) methods development. To help inform future CER methods investments, we describe the ARRA CER methods projects, identify barriers to this research and discuss the alignment of topics with published methods development priorities. We used several existing resources and held discussions with ARRA CER methods investigators. Although funded projects explored many identified priority topics, investigators noted that much work remains. For example, given the considerable investments in CER data infrastructure, the methods development field can benefit from additional efforts to educate researchers about the availability of new data sources and about how best to apply methods to match their research questions and data.

  10. AP1000R pressurised water reactor project in china advances toward completion

    International Nuclear Information System (INIS)

    Harrop, G.

    2014-01-01

    The AP1000 R pressurised water reactor (PWR) project in China is the first deployment of its first-of-a-kind Generation III+ technology, making it one of most internationally important and industry-significant new build projects. The innovative AP1000 PWR design contains advanced passive safety and performance features that involve fewer active safety components than a traditional plant, thereby reducing the site footprint. The AP1000 reactor is the first and only Generation III+ nuclear power plant to be granted design certification by the United States Nuclear Regulatory Commission, and it has received an Interim Design Acceptance Confirmation from the Office for Nuclear Regulation and an Interim Statement of Design Acceptability from the Environment Agency in the United Kingdom. Construction and testing of dual AP1000 PWR units is currently in progress in each of two coastal sites in the People's Republic of China: Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Since the initial contract award in 2007, the Westinghouse Consortium has worked in concert with the owners to construct the plants using innovative structural and mechanical modules. Uniquely designed plant components and essential instrumentation and control systems have been manufactured, delivered, and installed at the plants. Numerous personnel, including future reactor operators, have been trained at both the Sanmen and Haiyang sites, and technology transfer of technical documents and computer codes is well underway. The commercial operation dates are now nearing for Sanmen Unit 1 and Haiyang Unit 1, the first two units scheduled for completion. Consequently, these units are now in advanced stages of completion and present activities include planning and preparation for pre-operational testing, system turnover, and commissioning leading to fuel load, and eventual commercial operation. These activities are pioneering, in that they have never before been performed for a new build of

  11. Effect of the Building Act 2011 on compliance costs in Western Australia

    Directory of Open Access Journals (Sweden)

    Elizabeth Bazen

    2014-06-01

    Full Text Available  The Building Act 2011 commenced in Western Australia on 2 April 2012. It introduced private certification for design and construction compliance, and reduced fees and timeframes for local governments to issue permits. This research project assessed the effect of the Act on the time and cost of building approvals in WA, using an internet-based, self-completion survey to obtain feedback from people on their experience of the new building approvals process.   This research compared the cost of approval for 16 building projects under the new and old approvals processes. The research concluded that the new approvals process appears to be cost-neutral for the building industry as a whole. However, the cost of approval for the 11 building projects studied valued up to $1 million, particularly alterations to existing buildings, is an average of 4.0 times greater under the new approvals process.

  12. A socioeconomic assessment of Forest Service American Recovery and Reinvestment Act projects: eight case studies

    Science.gov (United States)

    Susan Charnley; Pamela J. Jakes; John Schelhas

    2011-01-01

    The American Recovery and Reinvestment Act of 2009 aimed to create jobs and jumpstart the economy while addressing the Nation’s social and environmental needs. The U.S. Department of Agriculture, Forest Service, received $1.15 billion in recovery funding to support projects in wildland fire management, capital improvement and maintenance, and biomass utilization. This...

  13. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Science.gov (United States)

    2010-10-01

    ... the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.58 Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with...

  14. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    International Nuclear Information System (INIS)

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  15. 77 FR 58111 - Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project...

    Science.gov (United States)

    2012-09-19

    ... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project Evaluation SUMMARY: The Institute of Education Sciences (IES) at the U.S. Department of Education (ED) is conducting a rigorous study of the Free Application for Federal Student Aid...

  16. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  17. Enel expects privatization to be completed

    International Nuclear Information System (INIS)

    Anon

    2006-01-01

    The collapse of the coalition will probably mean that the sale of state-owned stakes in two distribution companies and all the heating plants will not be completed and nor will privatisation at Zapadoslovenska energetika. Most important for the energy sector is uncertainty regarding the major privatization project of this government - finding a new owner of 66% of Slovenske elektrarne shares. The state expects to receive about 32 billion Slovak crowns (842.105 million EUR) from Enel for this stake. 'The cabinet has approved the privatization under certain conditions and those have to be met now,' answered the leader of the KDH deputy's club, Pavol Minarik, to the question whether the cabinet would still be able to muster sufficient votes in parliament to pass the Act on the national nuclear account. All other so-called delaying conditions are in the competence of the cabinet or the Ministry of Economy of the Slovak Republic and the opposition, which opposes privatization, cannot influence them. The act will address the financing of debts related to the liquidation of the V1 and A1 nuclear power plants. (authors)

  18. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-30

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  19. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  20. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  1. Gardening practices in a rural village in South Africa 10 years after completion of a home garden project.

    Science.gov (United States)

    Zimpita, Tisungeni; Biggs, Chara; Faber, Mieke

    2015-03-01

    Few studies have documented whether the behavior changes produced by home garden projects have been maintained after completion of the projects. To determine the benefits and challenges affecting production and consumption of β-carotene-rich vegetables and fruits in a rural South African village 10 years after completion of a home garden project. This cross-sectional survey assessed gardening practices and household consumption of β-carotene-rich vegetables and fruits using a questionnaire (n = 186). Benefits and challenges affecting production and consumption of β-carotene-rich vegetables and fruits were assessed through focus group discussions. Thirty-nine percent of the households currently planted β-carotene-rich vegetables and fruits. Major challenges included lack of fencing, animals eating crops, and lack or shortage of water. Planting materials for β-carotene-rich vegetables were sourced from the community nursery, while papaya was grown from its own seed. Shops were the most likely alternative sources of β-carotene-rich vegetables. The frequency of consumption of orange-fleshed sweet potato, butternut, spinach, and papaya when in season differed significantly, with households planting β-carotene-rich vegetables and fruits having more frequent consumption than households not planting these vegetables and fruits. Households planting β-carotene-rich vegetables and fruits were perceived as "well-to-do" and "healthy" households and as "givers". This study showed that 10 years after the endline evaluation of a home garden project, approximately one-third of the households in the village planted β-carotene-rich vegetables and fruits, which is very similar to the proportion at project completion and a postintervention study that was done 6 years later, despite various challenges, indicating that the practice of planting these vegetables and fruits was continued over the years.

  2. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  3. The common project for completion of Bubbler Condenser Qualification (Bohunice, Mochovce, Dukovany and Paks NPPs)

    International Nuclear Information System (INIS)

    Jaroslav, H.; Pavol, B.

    2003-01-01

    Described is the common project for completion of bubbler condenser qualification for nuclear power plants in Bohunice, Mochovice, Dukovany and Paks. Functionality of the bubbler condenser was elaborated during the simulation of the main steam line brake, medium break and small break LOCA. On this basis the appropriate operation of bubbler condenser containment under accident conditions can be positively confirmed

  4. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  5. Water transfer and major environmental provisions of the Central Valley Project Improvement Act: A preliminary economic evaluation

    Science.gov (United States)

    Loomis, John B.

    1994-06-01

    Increasing block water pricing, water transfer, and wildlife refuge water supply provisions of the Central Valley Project (CVP) Improvement Act are analyzed in terms of likely farmer response and economic efficiency of these provisions. Based on a simplified partial equilibrium analysis, we estimate small, but significant water conservation savings due to pricing reform, the potential for substantial water transfers to non-CVP customers in severe drought years when the water price exceeds 110 per acre foot (1 acre foot equals 1.234 × 103 m3) and positive net benefits for implementation of the wildlife refuge water supply provisions. The high threshold water price is partly a result of requiring farmers to pay full cost on transferred water plus a surcharge of 25 per acre foot if the water is transferred to a non-CVP user. The act also sets an important precedent for water pricing reform, water transfer provisions, and environmental surcharges on water users that may find their way to other Bureau of Reclamation projects.

  6. 3.6-m Devasthal Optical Telescope Project: Completion and first results

    Science.gov (United States)

    Kumar, Brijesh; Omar, Amitesh; Maheswar, Gopinathan; Pandey, Anil Kumar; Sagar, Ram; Uddin, Wahab; Sanwal, Basant Ballabh; Bangia, Tarun; Kumar, Tripurari Satyanarayana; Yadav, Shobhit; Sahu, Sanjit; Pant, Jayshreekar; Reddy, Bheemireddy Krishna; Gupta, Alok Chandra; Chand, Hum; Pandey, Jeewan Chandra; Joshi, Mohit Kumar; Jaiswar, Mukeshkuma; Nanjappa, Nandish; Purushottam; Yadav, Rama Kant Singh; Sharma, Saurabh; Pandey, Shashi Bhushan; Joshi, Santosh; Joshi, Yogesh Chandra; Lata, Sneh; Mehdi, Biman Jyoti; Misra, Kuntal; Singh, Mahendra

    2018-04-01

    We present an update on the 3.6-m aperture optical telescope, which has been installed at Devasthal in the year 2016. In this paper, a brief overview of installation activities at site and first results are presented. The 3.6-m Devasthal Optical Telescope project was initiated in 2007 by the Aryabhatta Research Institute of Observational Sciences (ARIES; Nainital, India) in partnership with Belgium. The telescope has Ritchey-Chretien optics, an alt-azimuth mount, an active control of the primary and a corrected science field of view of 30' at the Cassegrain focus. The construction of the telescope enclosure building was completed in June 2014 and after successful installation of the telescope. The first engineering light was obtained on 22 March 2015. The on-sky performance of the telescope was carried out till February 2016.

  7. Completion report for the UMTRA Project Vitro Processing Site. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approved design and that all US Environmental Protection Agency (EPA) standards have been satisfied. Included as appendixes to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawings, the EPA standards (40 CFR Part 192); the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objective of the remedial action at Salt Lake City is to remove the tailings from the Vitro processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. The final remedial action plan (RAP), which is approved by the US Department of Energy (DOE) and concurred upon by the US Nuclear Regulatory Commission (NRC) and the state of Utah, contains the conceptual design used to develop the final approved design. During remedial action construction operations, conditions were encountered that required design features that differed from the conceptual design. These conditions and the associated design changes are noted in the record drawings. All remedial action activities were completed in conformance with the specifications and drawings; the record drawings, in the state of Utah's opinion, reflect an accurate depiction of the existing property conditions at the processing site. 25 refs., 3 figs., 22 tabs

  8. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  9. New project? Don't analyze--act.

    Science.gov (United States)

    Schlesinger, Leonard A; Kiefer, Charles F; Brown, Paul B

    2012-03-01

    In a predictable world, getting a new initiative off the ground typically involves analyzing the market, creating a forecast, and writing a business plan. But what about in an unpredictable environment? The authors recommend looking to those who are experts in navigating extreme uncertainty while minimizing risk: serial entrepreneurs. These business leaders act, learn, and build their way into the future. Managers in traditional organizations can do the same, starting with smart, low-risk steps that follow simple rules: Use the means at hand; stay within an acceptable loss; secure only the commitment needed for the next step; bring along only volunteers; link the initiative to a business imperative; produce early results; and manage expectations. Momentum is gained by continuing to act based on what is learned at each step. The launch of Clorox's Green Works product line is discussed as an example.

  10. The articulation of voices in two film projects about violence – The Act of Killing and Gzim Rewind

    DEFF Research Database (Denmark)

    Frølunde, Lisbeth; Bjerregaard, Mette

    2014-01-01

    . Primarily, the analysis focuses on The Act of Killing and its reception by an Indonesian audience. The discussion concerns how these kinds of film projects open up very different voices and how this diversity potentially contributes to new understandings of the past, thereby fuelling social and political...

  11. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  12. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  13. A Lean Six Sigma quality improvement project to increase discharge paperwork completeness for admission to a comprehensive integrated inpatient rehabilitation program.

    Science.gov (United States)

    Neufeld, Nathan J; Hoyer, Erik H; Cabahug, Philippines; González-Fernández, Marlís; Mehta, Megha; Walker, N Colbey; Powers, Richard L; Mayer, R Samuel

    2013-01-01

    Lean Six Sigma (LSS) process analysis can be used to increase completeness of discharge summary reports used as a critical communication tool when a patient transitions between levels of care. The authors used the LSS methodology as an intervention to improve systems process. Over the course of the project, 8 required elements were analyzed in the discharge paperwork. The authors analyzed the discharge paperwork of patients (42 patients preintervention and 143 patients postintervention) of a comprehensive integrated inpatient rehabilitation program (CIIRP). Prior to this LSS project, 61.8% of required discharge elements were present. The intervention improved the completeness to 94.2% of the required elements. The percentage of charts that were 100% complete increased from 11.9% to 67.8%. LSS is a well-established process improvement methodology that can be used to make significant improvements in complex health care workflow issues. Specifically, the completeness of discharge documentation required for transition of care to CIIRP can be improved.

  14. The articulation of voices in two film projects about violence: The Act of Killing and Gzim Rewind

    Directory of Open Access Journals (Sweden)

    Lisbeth Frølunde

    2014-06-01

    Full Text Available This paper explores two experimental documentary films that present memories of acts of mass violence: The Act of Killing (Denmark, 2012, director Joshua Oppenheimer about the Indonesian anti-Communist purge in the 1960s and Gzim Rewind (Sweden, 2011, director Knutte Wester about the fate of a boy who fled from Kosovo in the 1990s. Using dialogic theory (Bakhtin, 1981; Phillips, 2011, we analyse the voices that are articulated about past violent events in the films. The focus is on how different voices interrelate in the filmic presentation of mass violence, including victims and killers. Primarily, the analysis focuses on The Act of Killing and its reception by an Indonesian audience. The discussion concerns how these kinds of film projects open up very different voices and how this diversity potentially contributes to new understandings of the past, thereby fuelling social and political change.

  15. The articulation of voices in two film projects about violence: The Act of Killing and Gzim Rewind

    Directory of Open Access Journals (Sweden)

    Lisbeth Frølunde

    2014-03-01

    Full Text Available This paper explores two experimental documentary films that present memories of acts of mass violence: The Act of Killing (Denmark, 2012, director Joshua Oppenheimer about the Indonesian anti-Communist purge in the 1960s and Gzim Rewind (Sweden, 2011, director Knutte Wester about the fate of a boy who fled from Kosovo in the 1990s. Using dialogic theory (Bakhtin, 1981; Phillips, 2011, we analyse the voices that are articulated about past violent events in the films. The focus is on how different voices interrelate in the filmic presentation of mass violence, including victims and killers. Primarily, the analysis focuses on The Act of Killing and its reception by an Indonesian audience. The discussion concerns how these kinds of film projects open up very different voices and how this diversity potentially contributes to new understandings of the past, thereby fuelling social and political change. 

  16. Sediment Properties: E-Area Completion Project

    Energy Technology Data Exchange (ETDEWEB)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site

  17. ACTS 2014

    DEFF Research Database (Denmark)

    Co-curator of ACTS 2014 together with Rasmus Holmboe, Judith Schwarzbart and Sanne Kofoed. ACTS is the Museum of Contemporary Art’s international bi-annual festival. ACTS was established in 2011 and, while the primary focus is on sound and performance art, it also looks toward socially oriented art....... For the 2014 festival, the museum has entered into a collaboration with the Department for Performance Design at Roskilde University – with continued focus on sound and performance art, and social art in public spaces. With ACTS, art moves out of its usual exhibition space and instead utilizes the city, its...... various possibilities and public spaces as a stage. ACTS takes place in and around the museum and diverse locations in Roskilde city. ACTS is partly curated by the museum staff and partly by guest curators. ACTS 2014 is supported by Nordea-fonden and is a part of the project The Museum goes downtown....

  18. The MIntAct project--IntAct as a common curation platform for 11 molecular interaction databases

    OpenAIRE

    Orchard, S; Ammari, M; Aranda, B; Breuza, L; Briganti, L; Broackes-Carter, F; Campbell, N; Chavali, G; Chen, C; del-Toro, N; Duesbury, M; Dumousseau, M; Galeota, E; Hinz, U; Iannuccelli, M

    2014-01-01

    IntAct (freely available at http://www.ebi.ac.uk/intact) is an open-source, open data molecular interaction database populated by data either curated from the literature or from direct data depositions. IntAct has developed a sophisticated web-based curation tool, capable of supporting both IMEx- and MIMIx-level curation. This tool is now utilized by multiple additional curation teams, all of whom annotate data directly into the IntAct database. Members of the IntAct team supply appropriate l...

  19. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  20. Environmental Guidance Program Reference Book: Endangered Species Act and the Fish and Wildlife Coordination Act. Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The Endangered Species Act and the Fish and Wildlife Coordination Act are major federal statutes designed to protect plant and animal resources from adverse effects due to development projects. Both Acts require consultation with wildlife authorities prior to committing resources to certain types of projects. The purposes and requirements of the two statutes are summarized in the following subsections. Also presented is a list of contacts in the regional and field offices of the US Fish and Wildlife Service.

  1. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  2. The advanced computational testing and simulation toolkit (ACTS)

    International Nuclear Information System (INIS)

    Drummond, L.A.; Marques, O.

    2002-01-01

    During the past decades there has been a continuous growth in the number of physical and societal problems that have been successfully studied and solved by means of computational modeling and simulation. Distinctively, a number of these are important scientific problems ranging in scale from the atomic to the cosmic. For example, ionization is a phenomenon as ubiquitous in modern society as the glow of fluorescent lights and the etching on silicon computer chips; but it was not until 1999 that researchers finally achieved a complete numerical solution to the simplest example of ionization, the collision of a hydrogen atom with an electron. On the opposite scale, cosmologists have long wondered whether the expansion of the Universe, which began with the Big Bang, would ever reverse itself, ending the Universe in a Big Crunch. In 2000, analysis of new measurements of the cosmic microwave background radiation showed that the geometry of the Universe is flat, and thus the Universe will continue expanding forever. Both of these discoveries depended on high performance computer simulations that utilized computational tools included in the Advanced Computational Testing and Simulation (ACTS) Toolkit. The ACTS Toolkit is an umbrella project that brought together a number of general purpose computational tool development projects funded and supported by the U.S. Department of Energy (DOE). These tools, which have been developed independently, mainly at DOE laboratories, make it easier for scientific code developers to write high performance applications for parallel computers. They tackle a number of computational issues that are common to a large number of scientific applications, mainly implementation of numerical algorithms, and support for code development, execution and optimization. The ACTS Toolkit Project enables the use of these tools by a much wider community of computational scientists, and promotes code portability, reusability, reduction of duplicate efforts

  3. The advanced computational testing and simulation toolkit (ACTS)

    Energy Technology Data Exchange (ETDEWEB)

    Drummond, L.A.; Marques, O.

    2002-05-21

    During the past decades there has been a continuous growth in the number of physical and societal problems that have been successfully studied and solved by means of computational modeling and simulation. Distinctively, a number of these are important scientific problems ranging in scale from the atomic to the cosmic. For example, ionization is a phenomenon as ubiquitous in modern society as the glow of fluorescent lights and the etching on silicon computer chips; but it was not until 1999 that researchers finally achieved a complete numerical solution to the simplest example of ionization, the collision of a hydrogen atom with an electron. On the opposite scale, cosmologists have long wondered whether the expansion of the Universe, which began with the Big Bang, would ever reverse itself, ending the Universe in a Big Crunch. In 2000, analysis of new measurements of the cosmic microwave background radiation showed that the geometry of the Universe is flat, and thus the Universe will continue expanding forever. Both of these discoveries depended on high performance computer simulations that utilized computational tools included in the Advanced Computational Testing and Simulation (ACTS) Toolkit. The ACTS Toolkit is an umbrella project that brought together a number of general purpose computational tool development projects funded and supported by the U.S. Department of Energy (DOE). These tools, which have been developed independently, mainly at DOE laboratories, make it easier for scientific code developers to write high performance applications for parallel computers. They tackle a number of computational issues that are common to a large number of scientific applications, mainly implementation of numerical algorithms, and support for code development, execution and optimization. The ACTS Toolkit Project enables the use of these tools by a much wider community of computational scientists, and promotes code portability, reusability, reduction of duplicate efforts

  4. Resonating Statements: Discursive acts in IT projects

    DEFF Research Database (Denmark)

    Hjelholt, Morten; Jensen, Tina Blegind

    2015-01-01

    IT projects are often complex arrangements of technological components, social actions, and organizational transformation that are difficult to manage in practice. This paper takes an analytical discourse perspective to explore the process of legitimizing IT projects. We introduce the concept...... of resonating statements to highlight how central actors navigate in various discourses over time. Particularly, the statements and actions of an IT project manager are portrayed to show how individuals can legitimize actions by connecting statements to historically produced discourses. The case study...... of an IT project in a Danish local government spans a two-year time period and demonstrates a double-loop legitimization process. First, resonating statements are produced to localize a national IT initiative to support the specificity of a local government discourse. Second, the resonating statements are used...

  5. Governance of project management and capital investments: A case study in Brazil’s mining industry

    Directory of Open Access Journals (Sweden)

    Jose Antonio Sousa Neto

    2012-12-01

    Full Text Available The objective of this paper is to present the results of a survey carried out to evaluate the application of corporate governance practices in the management of capital investments and projects by a Brazilian iron ore mining company in 2011. It addresses the main concepts related to projects and corporate governance, as well as the impacts of the Sarbanes-Oxley Act of 2002 on project management. Data were analyzed and processed using descriptive statistics. It was found that the four core disciplines of project governance: portfolio management, project sponsorship, project management, disclosure and reporting, are present in the organization’s management framework, including the application of controls necessary to ensure the accuracy of financial analysis and future cash flows from the successful completion of capital projects. On the other hand, a discrepancy was found in the disproportionate allocation of resources and staff to mega project management compared to small and medium projects which, as a result, are not completed on schedule and within budget. Deficiencies were also found in the attribution of priorities within the organization’s project portfolio.

  6. MNR Approvals for waterpower projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    On May 5, 2011, the Ontario Waterpower Association hosted the emergent hydro workshop in Peterborough. In the course of the workshop, the Ministry of Natural Resources (MNR) presented the different requirements for approval of waterpower projects. Various legislation administered by MNR applies to waterpower projects: the Public Lands Act, the Lakes and Rivers Improvement Act, the Endangered Species Act, 2007, and other legislation. The Public Lands Act provides policy and procedure for water power site release; the Lakes and Rivers Improvement Act was designed to manage, protect and preserve waters, land, fish, wildlife and other natural resources; the Endangered Species Act, 2007, is intended to protect species from extinction by protecting their habitats and promoting their recovery. MNR also administer other legislation, including the Aggregate Resources Act and the Forest Fires Prevention Act. This presentation provided an overview of the various pieces of legislation regulating waterpower projects which are administered by MNR.

  7. 76 FR 8359 - Boulder Canyon Project

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Western Area Power Administration (Western) is proposing an adjustment to the Boulder Canyon Project (BCP... Reclamation Project Act of 1939 (43 U.S.C. 485h(c)), and other acts that specifically apply to the project...

  8. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  9. The Relationship between Upper-Level Math Course Completion and ACT Math Sub Score Achievement

    Science.gov (United States)

    Dial, Larry Michael

    2016-01-01

    More high school students are taking the ACT and more students are taking it at an earlier age. States such as Missouri are now testing all public and charter school students during their junior year to use the ACT as a formative assessment to drive discussions about student schedules, plans of study, and course offerings. With more data from more…

  10. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Science.gov (United States)

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  11. ACTS for distance education in developing countries

    Science.gov (United States)

    Kalu, A.; Ventre, G.

    1995-08-01

    The need for electrical energy supply in the rural communities of developing countries has been well documented. Equally well known is the potential for photovoltaic in cost effectively meeting this need. A major impediment to fulfilling the need is the lack of indigenous personnel with a knowledgeof photovoltaic systems, and the associated infrastructure required to implement project. Various delivery schemes for providing the needed training to developing countries personnel have been investigated. Various train methods and programs that have been employed to remedy the problem have had significant drawbacks in terms of cost, consistency, impact, reach, and sustainability. The hypothesis to be tested in this project posits that satellite-based distance education using ACTS technologies can overcome these impediments. The purpose of the project is to investigate the applicability of the ACTS satellite in providing distance education in photovoltaic systems to developing countries and rural communities. An evaluation of the cost effectiveness of using ACTS unique technologies to overcome identified problems shall be done. The limitations of ACTS in surmounting distance education problems in developing countries shall be investigated. This project will, furthermore, provide training to Savannah State College faculty in photovoltaic (PV) systems and in distance education configurations and models. It will also produce training materials adequate for use in PV training programs via distance education. Savannah State College will, as a consequence become well equipped to play a leading role in the training of minority populations in photovoltaic systems and other renewables through its Center for Advanced Water Technology and Energy Systems. This communication provides the project outline including the specific issues that will be investigated during the project. Also presented i the project design which covers the participations of the various components of a network

  12. Stimulation Technologies for Deep Well Completions

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-09-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a study to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. An assessment of historical deep gas well drilling activity and forecast of future trends was completed during the first six months of the project; this segment of the project was covered in Technical Project Report No. 1. The second progress report covers the next six months of the project during which efforts were primarily split between summarizing rock mechanics and fracture growth in deep reservoirs and contacting operators about case studies of deep gas well stimulation.

  13. Completion report for the UMTRA project Vitro processing site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-08-01

    This completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approval design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendixes to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawing and the EPA standards; the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objectives of remedial action at Salt Lake City were to remove the tailings from the former processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. The final remedial action plan, which is approved by the U.S. Department of Energy and concurred upon by the U.S. Nuclear Regulator Commission and the state of Utah, contains the conceptual design used to develop the final approved design. During remedial action construction operations, conditions were encountered that required design features that differed form the conceptual design. These conditions and the associated design changes are noted in the record drawings. All remedial action activities were completed in conformance with the specifications and drawings. In the opinion of the state of Utah, the record drawings accurately reflect existing property conditions at the processing site

  14. ASN guide project: complete cleaning-up modalities acceptable in nuclear base installations in France - ASN guide project nr 14 - Release of 21/06/2010

    International Nuclear Information System (INIS)

    2010-01-01

    As any nuclear base installation evolves during its exploitation, some premises or buildings may change of use or be destroyed. In the first case, a complete cleaning up might be necessary to get rid of radioactive products. In order to deal with this issue, after a brief recall of the regulatory context and references, and a recall of the general doctrine of waste management in nuclear base installations in France, this guide project presents the principles for a complete cleaning up of structures belonging to an area containing nuclear wastes. It describes the modalities of definition of three different and successive defence lines. It defines the requirements in performing cleaning-up operations, the requirements in terms of quality insurance, and the different administrative procedures (before, during and after cleaning-up works). Some particular cases are addressed

  15. General hybrid projective complete dislocated synchronization with non-derivative and derivative coupling based on parameter identification in several chaotic and hyperchaotic systems

    International Nuclear Information System (INIS)

    Sun Jun-Wei; Shen Yi; Zhang Guo-Dong; Wang Yan-Feng; Cui Guang-Zhao

    2013-01-01

    According to the Lyapunov stability theorem, a new general hybrid projective complete dislocated synchronization scheme with non-derivative and derivative coupling based on parameter identification is proposed under the framework of drive-response systems. Every state variable of the response system equals the summation of the hybrid drive systems in the previous hybrid synchronization. However, every state variable of the drive system equals the summation of the hybrid response systems while evolving with time in our method. Complete synchronization, hybrid dislocated synchronization, projective synchronization, non-derivative and derivative coupling, and parameter identification are included as its special item. The Lorenz chaotic system, Rössler chaotic system, memristor chaotic oscillator system, and hyperchaotic Lü system are discussed to show the effectiveness of the proposed methods. (general)

  16. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  17. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  18. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  19. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  20. 77 FR 2533 - Boulder Canyon Project

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area...), is proposing an adjustment to the Boulder Canyon Project (BCP) electric service base charge and rates...) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and other acts that specifically apply to...

  1. SEAFOODplus: objectives, outputs, progress since the completion of the project

    DEFF Research Database (Denmark)

    Børresen, Torger

    the human nutrition area one project pointed toward new information indicating that fish protein has been overlooked as a key factor for human nutrition. When male individuals received a hypocaloric diet for weight reduction, the weight loss was significantly higher when the diet contained fish...... for delivering high amounts of essential nutrients, e.g. selenium, through optimal feed formulations, thus using fish as a carrier of important nutrients in the human diet. Traceability was a project area cutting across all the other areas within the SEAFOODplus project. New methods for implementing full...

  2. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  3. Advanced Communications Technology Satellite (ACTS): Four-Year System Performance

    Science.gov (United States)

    Acosta, Roberto J.; Bauer, Robert; Krawczyk, Richard J.; Reinhart, Richard C.; Zernic, Michael J.; Gargione, Frank

    1999-01-01

    The Advanced Communications Technology Satellite (ACTS) was conceived at the National Aeronautics and Space Administration (NASA) in the late 1970's as a follow-on program to ATS and CTS to continue NASA's long history of satellite communications projects. The ACTS project set the stage for the C-band satellites that started the industry, and later the ACTS project established the use of Ku-band for video distribution and direct-to-home broadcasting. ACTS, launched in September 1993 from the space shuttle, created a revolution in satellite system architecture by using digital communications techniques employing key technologies such as a fast hopping multibeam antenna, an on-board baseband processor, a wide-band microwave switch matrix, adaptive rain fade compensation, and the use of 900 MHz transponders operating at Ka-band frequencies. This paper describes the lessons learned in each of the key ACTS technology areas, as well as in the propagation investigations.

  4. Resource Conservation and Recovery Act ground-water monitoring projects for Hanford Facilities: Progress report, July 1--September 30, 1989

    International Nuclear Information System (INIS)

    Smith, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-12-01

    This is Volume 1 of a two-volume document that describes the progress of 14 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1989. This volume discusses the projects; Volume 2 provides as-built diagrams, completion/inspection reports, drilling logs, and geophysical logs for wells drilled, completed, or logged during this period. Volume 2 can be found on microfiche in the back pocket of Volume 1. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the sampled aquifer meets regulatory standards for drinking water quality

  5. Summary of questionnaires completed by participating countries: for the project on the management of water resources in the Sahel region, using isotopic techniques

    International Nuclear Information System (INIS)

    Ito, Mari

    2012-07-01

    This presentation was carried out as part of the project on water resources management in the Sahel region, using isotope techniques. It summarizes the two sets of questionnaires made, highlights the basins (aquifers) selected for the Sahel project which are the Lullemen Basin, Taoudeni Basin, Lake Chad Basin and Liptako Gourma. Also, as well as the number of questionnaires completed by the participating countries.

  6. Implicational (semilinear) logics III: completeness properties

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Noguera, Carles

    2018-01-01

    Roč. 57, 3-4 (2018), s. 391-420 ISSN 0933-5846 R&D Projects: GA ČR GA13-14654S EU Projects: European Commission(XE) 689176 - SYSMICS Institutional support: RVO:67985807 ; RVO:67985556 Keywords : abstract algebraic logic * protoalgebraic logics * implicational logics * disjunctional logics * semilinear logics * non-classical logics * completeness theorems * rational completeness Subject RIV: BA - General Mathematics; BA - General Mathematics (UTIA-B) OBOR OECD: Computer science s, information science , bioinformathics (hardware development to be 2.2, social aspect to be 5.8) Impact factor: 0.394, year: 2016

  7. Implicational (semilinear) logics III: completeness properties

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Noguera, Carles

    2018-01-01

    Roč. 57, 3-4 (2018), s. 391-420 ISSN 0933-5846 R&D Projects: GA ČR GA13-14654S EU Projects: European Commission(XE) 689176 - SYSMICS Institutional support: RVO:67985807 ; RVO:67985556 Keywords : abstract algebraic logic * protoalgebraic logics * implicational logics * disjunctional logics * semilinear logics * non-classical logics * completeness theorems * rational completeness Subject RIV: BA - General Mathematics; BA - General Mathematics (UTIA-B) OBOR OECD: Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8) Impact factor: 0.394, year: 2016

  8. Comment and response document for the UMTRA Project vitro processing site completion report Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This Comment and Response Document is a series of UMTRA document review forms regarding the UMTRA Project Vitro Processing Site Completion Report for Salt Lake City, Utah in March, 1995. The completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approved design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendices to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawings, the EPA standards (40 CFR Part 192); the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objective of the remedial action at Salt Lake City is to remove the tailings from the processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. Each section is evaluated in detail to check all aspects of above report, especially the inclusion of adequate verification data. Each review form contains a section entitled State of Utah Response and Action, which is an explanation or correction of DOE criticisms of the report

  9. Bali beach conservation project and issues related to beach maintenance after completion of project

    OpenAIRE

    Onaka, S.; Endo, S.; Uda, T.

    2013-01-01

    Bali Island in Indonesia is a world-famous resort area, and the beaches composed of coral sand are one of the most important resources for tourism. However, serious beach erosion has occurred since the 1970s owing to the tourism development along the coastal areas. To recover previous natural sandy beaches, Bali Beach Conservation Project was undertaken by the Indonesian Government as the ODA project financed by Japan. Three seriously eroded beaches (Sanur, Nusa Dua and Kuta) with a total len...

  10. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study. Volume 2: Appendices

    Science.gov (United States)

    Hanks, G. W.; Shomber, H. A.; Dethman, H. A.; Gratzer, L. B.; Maeshiro, A.; Gangsaas, D.; Blight, J. D.; Buchan, S. M.; Crumb, C. B.; Dorwart, R. J.

    1981-01-01

    The current status of the Active Controls Technology (ACT) for the advanced subsonic transport project is investigated through analysis of the systems technical data. Control systems technologies under examination include computerized reliability analysis, pitch axis fly by wire actuator, flaperon actuation system design trade study, control law synthesis and analysis, flutter mode control and gust load alleviation analysis, and implementation of alternative ACT systems. Extensive analysis of the computer techniques involved in each system is included.

  11. 25 CFR 169.27 - Power projects.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  12. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  13. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  14. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  15. MANAGING CONFLICT IN ENGINEERING PROJECTS: NEW ZEALAND EXPERIENCES

    Directory of Open Access Journals (Sweden)

    Nicola Naismith

    2016-07-01

    Full Text Available There is a wealth of knowledge concerning conflict management and its resolution in the workplace, however there is a dearth of information relating to conflict management and its resolution in engineering project management. This paper set out to examine the reality of conflict management in engineering project management in New Zealand. This was achieved through a review of credible literature sources and the completion of a pilot study to gain subject matter expert perspectives. The research suggests that conflicts can be destructive, resulting in anxiety and strong emotional responses leading to reflexive reactions including avoidance, aggression, fight, hostility and a breakdown in communications and relationships. Findings indicate that managing a project structure is synonymous with handling conflict and these disagreements can be detrimental to the success of a project. The initial results suggest that a number of factors act as drivers of conflict in engineering projects in New Zealand. These drivers are: power, personality, group dynamics and organisation culture. The conflict resolution tools cited as being widely used for engineering projects are collaboration and negotiation. The paper also offers recommendations for future research.

  16. UMTRA Ground Water Project management action process document

    International Nuclear Information System (INIS)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards

  17. 24 CFR 266.600 - Mortgage insurance premium: Insurance upon completion.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Mortgage insurance premium... MULTIFAMILY PROJECT LOANS Contract Rights and Obligations Mortgage Insurance Premiums § 266.600 Mortgage insurance premium: Insurance upon completion. (a) Initial premium. For projects insured upon completion, on...

  18. Project management for small business: a streamlined approach from planning to completion

    National Research Council Canada - National Science Library

    Phillips, Joseph

    2012-01-01

    ... a Project Management Plan 81 72 Developing the Work Breakdown Structure 85 76 Selecting Your Project Management Software 83 65 CHAPTER 4: MANAGING PROJECT COSTS Building a Cost Management Frame...

  19. Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-06-01

    have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control

  20. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  1. 24 CFR 232.630 - Assurance of completion.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Special Requirements § 232.630 Assurance of completion. If the property upon...

  2. Implementing section 1332, Energy Policy Act of 1992

    International Nuclear Information System (INIS)

    Atwood, T.

    1993-01-01

    Sections 1332 Clean Coal Technology, and 1608 Environmental Technology of the Energy Policy Act of 1992 (EPACT) describe two technology Transfer Programs for creating jobs and reducing the trade deficit for the US, through providing financial assistance for projects to improve energy efficiency and reduce environmental emissions including open-quotes Greenhouse Gases.close quotes These projects are to be located in countries which are supported by the Agency for International Development (AID) or in countries with an economy in transition from a non-market to a market economy. The legislation requires a very similar approach for the two programs. Working with AID the DOE is to: (1) complete in 150 days an agreement with the appropriate US agencies for conducting the program in the host countries; (2) issue in 240 days a list of potential projects; (3) within one year issue a solicitation and (4) within 120 days after receipt of proposals make selection. In addition, the programs are to develop a procedure for providing financial assistance to projects applying for solicitations in other countries. After an initial consultation with US Treasury, Export-Import Bank, Overseas Private Investment Corp. (OPIC), and AID concerning Organization for Economic Cooperative Development rules for export credits, and the most appropriate means of financing projects under the Transfer Programs, it became apparent that, in addition to providing financing for projects through DOE programs, a more efficient, economical and prudent approach to implementing a transfer program would involve the financing of projects through organizations already experienced in the development of overseas investments. The program approach for implementation of these technology transfer programs is discussed

  3. An Overview of the Advanced CompuTational Software (ACTS)Collection

    Energy Technology Data Exchange (ETDEWEB)

    Drummond, Leroy A.; Marques, Osni A.

    2005-02-02

    The ACTS Collection brings together a number of general-purpose computational tools that were developed by independent research projects mostly funded and supported by the U.S. Department of Energy. These tools tackle a number of common computational issues found in many applications, mainly implementation of numerical algorithms, and support for code development, execution and optimization. In this article, we introduce the numerical tools in the collection and their functionalities, present a model for developing more complex computational applications on top of ACTS tools, and summarize applications that use these tools. Lastly, we present a vision of the ACTS project for deployment of the ACTS Collection by the computational sciences community.

  4. As our earliest supported research projects move toward completion ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    CCAA

    and evaluation of farmer field schools” for southern and central ... CCAA research and capacity building projects, including papers, book chapters, newsletters, bulletins and theses .... climatique et à l'action de l'homme : mémoire de master de.

  5. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  6. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  7. Canons and Heroes: The Reception of the Complete Works Translation Project in Finland, 2002-13

    Directory of Open Access Journals (Sweden)

    Keinänen Nely

    2017-12-01

    Full Text Available This essay examines the reception of the ten-year Complete Works translation project undertaken by the Finnish publishing company Werner Söderström Oy (WSOY in 2004-13. Focusing on reviews published in the first and last years of the project, the essay details ongoing processes of Shakespeare (re-canonization in Finland, as each new generation explains to itself what Shakespeare means to them, and why it continues to read, translate and perform Shakespeare. These processes are visible in comments from the series editors and translators extolling the importance of Shakespeare’s work and the necessity of creating new, modern translations so Finns can read Shakespeare in their mother tongue; in discussions of the literary qualities of a good Shakespeare translation, e.g. whether it is advisable to use iambic pentameter in Finnish, a trochaic language; and in the creation of publisher and translator “heroes,” who at significant cost to themselves, whether in money in terms of the publisher, or time and effort in terms of the translators, labour to provide the public with their Shakespeare in modern Finnish. While on the whole reviewers celebrated the new translations, there was some resistance to changes in familiar lines from older translations, such as Macbeth’s “tomorrow” speech, suggesting that there are nevertheless some limits on modernizing “classic” translations.

  8. Magic informationally complete POVMs with permutations

    Science.gov (United States)

    Planat, Michel; Gedik, Zafer

    2017-09-01

    Eigenstates of permutation gates are either stabilizer states (for gates in the Pauli group) or magic states, thus allowing universal quantum computation (Planat, Rukhsan-Ul-Haq 2017 Adv. Math. Phys. 2017, 5287862 (doi:10.1155/2017/5287862)). We show in this paper that a subset of such magic states, when acting on the generalized Pauli group, define (asymmetric) informationally complete POVMs. Such informationally complete POVMs, investigated in dimensions 2-12, exhibit simple finite geometries in their projector products and, for dimensions 4 and 8 and 9, relate to two-qubit, three-qubit and two-qutrit contextuality.

  9. 100 Area D4 Project Building Completion Report: December 2008 to December 2009

    International Nuclear Information System (INIS)

    Finucane, K.G.; Harrie, J.P.

    2010-01-01

    This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009. The following buildings are included in this report: 11-N Change Room; 13-N Storage Building; 107-N Basin Recirculation Facility; 108-N Chemical Unloading Facility; 183-ND Resin Disposal Pit; 183-F Clearwells; 188-D Ash Disposal Pit; 1524-N Hazardous Waste Storage Pad; 1525-N Laydown Storage Area; 1607-Ni Sewage Tank; 1607-N2 Sewage Tank; 1706-NA Sewage Lift Station; 1904-D Outfall Structure; MO-013 Mobile Office Trailer; MO-422 Mobile Office Trailer; and MO-999 Mobile Office Trailer. Demolition debris and soil associated with completion of these buildings were disposed at the Environmental Restoration Disposal Facility (ERDF), located at the Hanford Site. Postdemolition direct hand instrument surveys and Global Positioning Environmental Radiological Survey (GPERS) surveys were performed on excavations after loadout of debris and prior to backfill. The 100 Area D4/Interim Safe Storage (ISS) project personnel worked a total of approximately 137,930 hours (manual and non-manual, not including subcontractors) from December 1, 2008, to December 31, 2009. During this time there were 10 Occupational Safety and Health Administration (OSHA) recordable injuries, two of which involved lost time. There also were 27 first aid cases during this time period. No clothing contamination and no skin contamination incidents occurred during demolition of the 100 Area buildings. Workers received 7,350.2 person-mrem of radiological exposure from December 1, 2008, to December 31, 2009 during their support of D4 activities associated with the buildings discussed in this report. All boundary air sample results were below procedural action levels for the duration of the work performed.

  10. Pumped storage project ''Energiespeicher Riedl''; Das Projekt Energiespeicher Riedl

    Energy Technology Data Exchange (ETDEWEB)

    Mayr, Dominik [Verbund Hydro Power AG, Vienna (Austria); Schmauss, Juergen [Regierung von Niederbayern, Landshut (Germany); Neuwerth, Sabine [Grenzkraftwerke GmbH, Simbach am Inn (Germany)

    2012-07-01

    The ''Donaukraftwerk Jochenstein AG'' (DKJ) plans at the river power plant Jochenstein on the Danube in the district of Passau, Bavaria, South-east Germany, the construction of a modern pumped-storage hydropower plant with a capacity of 300 megawatts, the pumped storage ''Energiespeicher Riedl''. The planned plant is a regionally significant project by the Regional Planning act. Therefore, the DKJ as applicant submitted the documents for the regional planning proceedings to the Government of Lower Bavaria, which completed the process with the positive regional planning assessment under provisos on 01.08.2011, which led to an optimization of the project layout. (orig.)

  11. EGS hydraulic stimulation monitoring by surface arrays - location accuracy and completeness magnitude: the Basel Deep Heat Mining Project case study

    Science.gov (United States)

    Häge, Martin; Blascheck, Patrick; Joswig, Manfred

    2013-01-01

    The potential and limits of monitoring induced seismicity by surface-based mini arrays was evaluated for the hydraulic stimulation of the Basel Deep Heat Mining Project. This project aimed at the exploitation of geothermal heat from a depth of about 4,630 m. As reference for our results, a network of borehole stations by Geothermal Explorers Ltd. provided ground truth information. We utilized array processing, sonogram event detection and outlier-resistant, graphical jackknife location procedures to compensate for the decrease in signal-to-noise ratio at the surface. We could correctly resolve the NNW-SSE striking fault plane by relative master event locations. Statistical analysis of our catalog data resulted in M L 0.36 as completeness magnitude, but with significant day-to-night dependency. To compare to the performance of borehole data with M W 0.9 as completeness magnitude, we applied two methods for converting M L to M W which raised our M C to M W in the range of 0.99-1.13. Further, the b value for the duration of our measurement was calculated to 1.14 (related to M L), respectively 1.66 (related to M W), but changes over time could not be resolved from the error bars.

  12. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  13. Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel

    Science.gov (United States)

    Kevdzija, Susan L.

    2001-01-01

    Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.

  14. Largest particle detector nearing completion

    CERN Multimedia

    2006-01-01

    "Construction of another part of the Large Hadron Collider (LHC), the worl's largest particle accelerator at CERN in Switzerland, is nearing completion. The Compact Muon Solenoid (CMS) is oner of the LHC project's four large particle detectors. (1/2 page)

  15. Exploring primary care activities in ACT teams.

    Science.gov (United States)

    Vanderlip, Erik R; Williams, Nancy A; Fiedorowicz, Jess G; Katon, Wayne

    2014-05-01

    People with serious mental illness often receive inadequate primary and preventive care services. Federal healthcare reform endorses team-based care that provides high quality primary and preventive care to at risk populations. Assertive community treatment (ACT) teams offer a proven, standardized treatment approach effective in improving mental health outcomes for the seriously mentally ill. Much is known about the effectiveness of ACT teams in improving mental health outcomes, but the degree to which medical care needs are addressed is not established. The purpose of this study was to explore the extent to which ACT teams address the physical health of the population they serve. ACT team leaders were invited to complete an anonymous, web-based survey to explore attitudes and activities involving the primary care needs of their clients. Information was collected regarding the use of health screening tools, physical health assessments, provision of medical care and collaboration with primary care systems. Data was analyzed from 127 team leaders across the country, of which 55 completed the entire survey. Nearly every ACT team leader believed ACT teams have a role in identifying and managing the medical co-morbidities of their clientele. ACT teams report participation in many primary care activities. ACT teams are providing a substantial amount of primary and preventive services to their population. The survey suggests standardization of physical health identification, management or referral processes within ACT teams may result in improved quality of medical care. ACT teams are in a unique position to improve physical health care by virtue of having medically trained staff and frequent, close contact with their clients.

  16. 78 FR 50094 - Notice of Inventory Completion: Maxey Museum, Walla Walla, WA

    Science.gov (United States)

    2013-08-16

    ... Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of human remains under the control....R50000] Notice of Inventory Completion: Maxey Museum, Walla Walla, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Maxey Museum has completed an inventory of human remains in...

  17. UMTRA -- The US Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Lightner, R.; Cormier, C.; Bierley, D.

    1995-01-01

    In the late 1970s, the United States (US) established the first comprehensive regulatory structure for the management, disposal, and long-term care of wastes produced from its domestic uranium processing industry. This regulatory framework was established through the passage of the Uranium Mill Tailings Radiation Control Act of 1978, often referred to as UMTRCA. This legislation created the Uranium Mill Tailings Remedial Action (UMTRA) Project and assigned the US Department of Energy (DOE) the lead in conducting the required remedial action at 24 designated inactive uranium ore processing sites. With the majority of these 22 sites complete, the DOE's UMTRA Project has established a distinguished reputation for safely and effectively remediating these low-level waste sites in a complex regulatory and socioeconomic environment. This paper describes the past accomplishments and current status of the UMTRA Project and discusses the DOE's plans for addressing ground water contamination associated with these sites and its commitment to continuing the long-term care and management of these disposal cells

  18. Report and recommendations of the Pingston Hydroelectric Project Committee with respect to the issuance of a project approval certificate pursuant to the Environmental Assessment Act, R.S.B.C. 1966, c.119 and fulfilling the requirements for a screening report pursuant to the Canadian Environmental Assessment Act, 1992 c.37, V.1

    International Nuclear Information System (INIS)

    1999-05-01

    A final application was submitted in March 1998 by Canadian Hydro Developers (CHD) with the intent of obtaining a Project Approval certificate under the Act for development of the Project. The purpose of the project committee report is to summarize the application and project report, to describe the potential environmental, economic, social, cultural, heritage and health effects of the project and measures required to mitigate significant adverse effects and to document the recommendations of the committee. The Project is composed of five main parts including the headworks, tunnel, penstock, powerhouse and transmission line. The potential environmental effects of the Project relate mainly to fisheries resources including entrainment at the intake, instream flow needs downstream from the headworks, alteration of fish habitat, sedimentation, and blockage of fish passage. CHD expects to minimize these effects through facility design modifications, operational changes and monitoring programs as required. Other concerns such as alteration of creek temperature, generation of methyl mercury in reservoirs, greenhouse gas flux in reservoirs and total gas pressures have been examined in light of the Project's size and operational schenarios, and the proponent expects these effects to be of minor concern. The Project Committee concluded that the project, with successful implementation and compliance of mitigation and compensation strategies, is not expected to cause significant adverse effects

  19. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    the Department of Energy (DOE) wishes to make significant changes to the WIPP disposal system, those changes must be reviewed and approved by the EPA prior to or following recertification, via the 'planned change' process. As a measure of plans to implement significant changes to the WIPP disposal system that were not included in the CCA prior to recertification, this plan includes a 'blackout period' during which the DOE will refrain from proposing significant changes to the EPA. This 'blackout period' is intended to allow the EPA sufficient time to act on the DOE's change requests prior to recertification, anticipating that a rule making will be required before the EPA can act on some change requests. The 'blackout period' will also allow the DOE sufficient time to prepare the recertification application after the EPA acts on the change requests. A third major principle woven into this plan commits the DOE to providing, as part of the CRA, the results of impact, performance, or compliance assessments that examine the combined effects of changes made to the disposal system since submission of the CCA. The end-result of the Recertification Project is intended to be a decision by the EPA to recertify the repository without interruptions in disposal operations. A critically important milestone as we move toward that end result will be the production and delivery to the EPA of the CRA. All institutional members of the WIPP family have an extremely heavy stake in timely and effective completion of the work outlined in this plan. We owe it to the nation to complete this effort in a manner that allows for unabated cleanup of defense-related transuranic (TRU) nuclear waste. Our belief and hope is that this effort will serve as an excellent model to be followed in future recertifications of the repository.

  20. Completion of Units 3 and 4 at Mochovce NPP

    International Nuclear Information System (INIS)

    Aquilanti, G.

    2009-01-01

    After the completion of a feasibility study, SE/ENEL decided to complete Mochovce Nuclear Power Plant Units 3 and 4 in April 2007. In July 2008, after a revision of the Basic Design that led to the inclusion of additional safety improvements, the European Commission issued a positive viewpoint on the decision. In August 2008 the Slovak Nuclear Regulatory Authority issued a permit for 'modification of a construction project prior to its completion', approving the Basic Design modifications: the kick-off of site activities was on November 2008. In December 2008, SE initiated the Environmental Impact Assessment (EIA) procedure aimed at obtaining the Operational License by submitting the EIA intent to the Ministry of Environment. A multi contractual strategy was adopted for the completion works: the total number of foreseen contracts is about 250 (90 main and additional 160 minor). In the following the present status of the project is presented: in particular, the Project Management system implemented by SE/ENEL is described and the progress of the engineering, fabrication and construction activities is analyzed. (author)

  1. CAVITY LIKE COMPLETIONS IN WEAK SANDS PREFERRED UPSTREAM MANAGEMENT PRACTICES

    Energy Technology Data Exchange (ETDEWEB)

    Ian Palmer; John McLennan

    2004-04-30

    The technology referred to as Cavity Like Completions (CLC) offers a new technique to complete wells in friable and unconsolidated sands. A successfully designed CLC provides significant increases in well PI (performance index) at lower costs than alternative completion techniques. CLC technology is being developed and documented by a partnership of major oil and gas companies through a GPRI (Global Petroleum Research Institute) joint venture. Through the DOE-funded PUMP program, the experiences of the members of the joint venture will be described for other oil and gas producing companies. To date six examples of CLC completions have been investigated by the JV. The project was performed to introduce a new type of completion (or recompletion) technique to the industry that, in many cases, offers a more cost effective method to produce oil and gas from friable reservoirs. The project's scope of work included: (1) Further develop theory, laboratory and field data into a unified model to predict performance of cavity completion; (2) Perform at least one well test for cavity completion (well provided by one of the sponsor companies); (3) Provide summary of geo-mechanical models for PI increase; and (4) Develop guidelines to evaluate success of potential cavity completion. The project tracks the experiences of a joint industry consortium (GPRI No. 17) over a three year period and compiles results of the activities of this group.

  2. Source term modelling parameters for Project-90

    International Nuclear Information System (INIS)

    Shaw, W.; Smith, G.; Worgan, K.; Hodgkinson, D.; Andersson, K.

    1992-04-01

    This document summarises the input parameters for the source term modelling within Project-90. In the first place, the parameters relate to the CALIBRE near-field code which was developed for the Swedish Nuclear Power Inspectorate's (SKI) Project-90 reference repository safety assessment exercise. An attempt has been made to give best estimate values and, where appropriate, a range which is related to variations around base cases. It should be noted that the data sets contain amendments to those considered by KBS-3. In particular, a completely new set of inventory data has been incorporated. The information given here does not constitute a complete set of parameter values for all parts of the CALIBRE code. Rather, it gives the key parameter values which are used in the constituent models within CALIBRE and the associated studies. For example, the inventory data acts as an input to the calculation of the oxidant production rates, which influence the generation of a redox front. The same data is also an initial value data set for the radionuclide migration component of CALIBRE. Similarly, the geometrical parameters of the near-field are common to both sub-models. The principal common parameters are gathered here for ease of reference and avoidance of unnecessary duplication and transcription errors. (au)

  3. The Anticoagulation of Calf Thrombosis (ACT project: study protocol for a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Horner Daniel

    2012-04-01

    Full Text Available Abstract Background Half of all lower limb deep vein thrombi (DVT in symptomatic ambulatory patients are located in the distal (calf veins. While proximal disease warrants therapeutic anticoagulation to reduce the associated risks, distal DVT often goes untreated. However, a proportion of untreated distal disease will undoubtedly propagate or embolize. Concern also exists that untreated disease could lead to long-term post thrombotic changes. Currently, it is not possible to predict which distal thrombi will develop such complications. Whether these potential risks outweigh those associated with unrestricted anticoagulation remains unclear. The Anticoagulation of Calf Thrombosis (ACT trial aims to compare therapeutic anticoagulation against conservative management for patients with acute symptomatic distal deep vein thrombosis. Methods ACT is a pragmatic, open-label, randomized controlled trial. Adult patients diagnosed with acute distal DVT will be allocated to either therapeutic anticoagulation or conservative management. All patients will undergo 3 months of clinical and assessor blinded sonographic follow-up, followed by 2-year final review. The project will commence initially as an external pilot study, recruiting over a 16-month period at a single center to assess feasibility measures and clinical event rates. Primary outcome measures will assess feasibility endpoints. Secondary clinical outcomes will be collected to gather accurate data for the design of a definitive clinical trial and will include: (1 a composite endpoint combining thrombus propagation to the popliteal vein or above, development of symptomatic pulmonary embolism or sudden death attributable to venous thromboembolic disease; (2 the incidence of major and minor bleeding episodes; (3 the incidence of post-thrombotic leg syndrome at 2 years using a validated screening tool; and (4 the incidence of venous thromboembolism (VTE recurrence at 2 years. Discussion The ACT trial

  4. Capturing the benefits of complete streets.

    Science.gov (United States)

    2015-12-01

    Anecdotal information indicates that private investment and property value increases are associated : with featured Complete Streets projects. However, to date, little research has been done to confirm : these benefits. Much of the relevant literatur...

  5. 76 FR 17997 - Privacy Act of 1974, as Amended

    Science.gov (United States)

    2011-03-31

    ... entitled ``Treasury/IRS 42.888--Qualifying Therapeutic Discovery Project Records.'' DATES: Comments must be... with the Department of Health and Human Services, the Qualifying Therapeutic Discovery Program pursuant... and Education Reconciliation Act of 2010 (Pub. L. 111-152) (Affordable Care Act). The qualifying...

  6. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  7. Structural Completeness in Fuzzy Logics

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Metcalfe, G.

    2009-01-01

    Roč. 50, č. 2 (2009), s. 153-183 ISSN 0029-4527 R&D Projects: GA MŠk(CZ) 1M0545 Institutional research plan: CEZ:AV0Z10300504 Keywords : structral logics * fuzzy logics * structural completeness * admissible rules * primitive variety * residuated lattices Subject RIV: BA - General Mathematics

  8. Memorandum of Understanding Completion and Acceptance of the Spent Nuclear Fuel Project

    International Nuclear Information System (INIS)

    NISHIKAWA, L.D.

    1999-01-01

    This Memorandum of Understanding (MOU) is written to provide clear direction with respect to roles, responsibilities, obligations, and expectations of each organization identified. It functions as an agreement between the Operations, Construction Projects and Startup Organizations within the Spent Nuclear Fuels Project

  9. Human Capital Investment and the Completion of Risky R&D Projects

    DEFF Research Database (Denmark)

    Siyahhan, Baran; Engelbert, Dockner

    2010-01-01

    but can be observed during the R&D phase of the project. The exogenous value of the patent determines the firm’s decisions to invest in human capital, to abandon the project if nec- essary, and to invest in marketing the new product. We study the corresponding optimal stopping times, determine their value...... and risk consequences, and derive optimal investment in the stock of human capital. While optimal investment in human capital is very sensitive to its productivity do increase the probability of a breakthrough it is insensitive to changes in the volatility of the present value of the patent. The value...... of the firm is driven by fixed labor costs that occur until the breakthrough is made, the call option to invest in human capital and market the product, and the put option to abandon the project. These options together with labor costs’ based operating leverage determine the risk dynamics. Risk varies non...

  10. On the Completeness of Quantum Mechanics

    OpenAIRE

    Kupczynski, Marian

    2002-01-01

    Quantum cryptography, quantum computer project, space-time quantization program and recent computer experiments reported by Accardi and his collaborators show the importance and actuality of the discussion of the completeness of quantum mechanics (QM) started by Einstein more than 70 years ago. Many years ago we pointed out that the violation of Bell's inequalities is neither a proof of completeness of QM nor an indication of the violation of Einsteinian causality. We also indicated how and i...

  11. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  12. Recovery Act--Class 8 Truck Freight Efficiency Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Trucks, Daimler [Daimler Trucks North America Llc, Portland, OR (United States)

    2015-07-26

    Daimler Trucks North America completed a five year, $79.6M project to develop and demonstrate a concept vehicle with at least 50% freight efficiency improvement over a weighted average of several drive cycles relative to a 2009 best-in-class baseline vehicle. DTNA chose a very fuel efficient baseline vehicle, the 2009 Freightliner Cascadia with a DD15 engine, yet successfully demonstrated a 115% freight efficiency improvement. DTNA learned a great deal about the various technologies that were incorporated into Super Truck and those that, through down-selection, were discarded. Some of the technologies competed with each other for efficiency, and notably some of the technologies complemented each other. For example, we found that Super Truck’s improved aerodynamic drag resulted in improved fuel savings from eCoast, relative to a similar vehicle with worse aerodynamic drag. However, some technologies were in direct competition with each other, namely the predictive technologies which use GPS and 3D digital maps to efficiently manage the vehicles kinetic energy through controls and software, versus hybrid which is a much costlier technology that essentially targets the same inefficiency. Furthermore, the benefits of a comprehensive, integrated powertrain/vehicle approach was proven, in which vast improvements in vehicle efficiency (e.g. lower aero drag and driveline losses) enabled engine strategies such as downrating and downspeeding. The joint engine and vehicle developments proved to be a multiplier-effect which resulted in large freight efficiency improvements. Although a large number of technologies made the selection process and were used on the Super Truck demonstrator vehicle, some of the technologies proved not feasible for series production.

  13. STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Wolhart

    2003-06-01

    The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

  14. Stimulation Technologies for Deep Well Completions

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Wolhart

    2005-06-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

  15. 78 FR 59966 - Notice of Inventory Completion: Michigan State Police, Jackson Post, Jackson, MI

    Science.gov (United States)

    2013-09-30

    ... Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of human remains under the control....R50000] Notice of Inventory Completion: Michigan State Police, Jackson Post, Jackson, MI AGENCY: National... completed an inventory of human remains, following the initiation of consultation with the appropriate...

  16. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study

    Science.gov (United States)

    1982-01-01

    The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.

  17. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    Energy Technology Data Exchange (ETDEWEB)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  18. MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS

    Directory of Open Access Journals (Sweden)

    Christopher J. Willis

    2011-10-01

    Full Text Available A study measuring the performance of Guyana’s construction industry using a set of project performance benchmarking metrics was recently completed. The underlying premise of the study was that the aggregated performance of construction projects provides a realistic assessment of the performance of the construction industry, on the basis that construction projects are the mechanism through which the construction industry creates its tangible products. The fact that an influential government agency acted as owner of the study was critical to the data collection phase. The best approach for collecting project performance data in Guyana involves the utilisation of a researcher or team of researchers mining electronic and hard copy project documents. This study analysed approximately 270 construction projects to obtain an indication of the performance of guyana’s construction industry. It was found that sea defence projects performed the worst, whereas health facility projects performed the best. The main implication of this is that sea defence projects are likely to be the least efficient and, given their critical nature, there is an argument for urgent performance improvement interventions.

  19. Annual Report to Parliament Access to Information Act International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    leonardi

    Part 6: Completion time of consultations on Cabinet confidences . ... The Act gives Canadian citizens and permanent residents the right to have access to federal government ... The ATIP Coordinator works with IDRC's Information Management .... to its employees on the Act. However, a training program was developed and.

  20. Evaluation of research projects and studies on nuclear safety in the context of implementation of the German Atomic Energy Act (AtG). Vol. 9

    International Nuclear Information System (INIS)

    Casper, H.

    2000-01-01

    The content of this report is a collection of research projects and investigations in the field of nuclear safety evaluated in 1999 and 2000 with regard to the application of the Atomic Energy Act (Atomgesetz). In addition the report gives an overview on objectives and procedures used for the evaluation. The purpose of this project, being executed for the Federal Ministry for Environment, Nature Conservation and Nuclear Safety (BMU) of the Federal Republic of Germany is to inform all parties involved in the licensing procedure as well as the consulting councils on the latest nuclear safety research results and the status of their verification in a precise short manner. In addition experts' opinions are given with regard to the relevance of these research results to nuclear rules and guidelines as well as to the execution of the Atomic Energy Act. The information consists of precise and short evaluations of final research reports or technical reports. These evaluations are prepared by specialists who are acquainted with the technical aspects of the licensing procedure of nuclear plants in the Federal Republic of Germany. This volume is the ninth report of this series. (orig.) [de

  1. Message from the Director General Final costs to completion of LHC

    CERN Multimedia

    Luciano Maiani

    2001-01-01

    In March this year a review of the costs for the LHC machine was started, which was completed by the end of August. This was a bottom-up review with each group concerned making a projection of the cost to completion of the project. Figures presented were worryingly high. In conjunction, the responses from industries to the calls for tender for essential machine components, especially the superconducting magnet assembly, were also higher than originally anticipated. A summary of this situation was presented to the Finance Committee last week and then to the Committee of Council. After the meetings a summary was prepared by the chairman of Committee of Council which I reprint below. CHAIRMAN'S SUMMARY In the 248th Meeting of the Committee of Council, the Director-General presented a preliminary estimate of the cost to completion of the LHC Project, approved in 1994 and scheduled for commissioning and operation in 2006. Repeating that the project is well advanced and technically sound, the figures presented, s...

  2. West Valley Demonstration Project, West Valley, New York: Annual report

    International Nuclear Information System (INIS)

    1989-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Services Center, West Valley, New York, that resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972, is to be solidified in borosilicate glass and transported to a federal repository for geologic disposal. A major milestone was reached in May 1988 when the Project began reducing the volume of the liquid high-level waste. By the end of 1988, approximately 15 percent of the initial inventory had been processed into two waste streams. The decontaminated low-level liquid waste is being solidified in cement. The high-level waste stream is being stored in an underground tank pending its incorporation into borosilicate glass. Four tests of the waste glass melter system were completed. These tests confirmed equipment operability, control system reliability, and provided samples of waste glass for durability testing. In mid-1988, the Department validated an integrated cost and schedule plan for activities required to complete the production of the waste borosilicate glass. Design of the radioactive Vitrification Facility continued

  3. 78 FR 48670 - Boulder Canyon Project

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... INFORMATION: Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits...

  4. 77 FR 48151 - Boulder Canyon Project

    Science.gov (United States)

    2012-08-13

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... INFORMATION: Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits...

  5. 76 FR 56430 - Boulder Canyon Project

    Science.gov (United States)

    2011-09-13

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Project (BCP) electric service provided by the Western Area Power Administration (Western). The Rates will... by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits on the Colorado River...

  6. Kurt Gödel, completeness, incompleteness

    Czech Academy of Sciences Publication Activity Database

    Hájek, Petr

    2007-01-01

    Roč. 82, č. 1 (2007), 012005_1-012005_4 E-ISSN 1742-6596. [Brno Kurt Gödel Days. Brno, 25.04.2007-28.04.2007] R&D Projects: GA AV ČR IAA100300503 Institutional research plan: CEZ:AV0Z10300504 Keywords : Kurt Gödel * completeness * incompleteness Subject RIV: BA - General Mathematics

  7. 77 FR 49797 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2012-08-17

    ... social marketing campaigns under the umbrella of the larger Act Against AIDS campaign. The target... Project Formative Research for the Development of CDC's Act Against AIDS Social Marketing Campaigns... period to develop various social marketing campaigns aimed at increasing HIV testing rates, increasing...

  8. 75 FR 67396 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2010-11-02

    ... report on the Technology Initiatives Grants (``TIG'') program.\\1\\ \\1\\ Any portion of the closed session... Technology Initiatives Grants (``TIG'') program. 5. Consider and act on proposal regarding a research project...

  9. The Advanced Communications Technology Satellite (ACTS) capabilities for serving science

    Science.gov (United States)

    Meyer, Thomas R.

    1990-01-01

    Results of research on potential science applications of the NASA Advanced Communications Technology Satellite (ACTS) are presented. Discussed here are: (1) general research on communications related issues; (2) a survey of science-related activities and programs in the local area; (3) interviews of selected scientists and associated telecommunications support personnel whose projects have communications requirements; (4) analysis of linkages between ACTS functionality and science user communications activities and modes of operation; and (5) an analysis of survey results and the projection of conclusions to a national scale.

  10. 78 FR 2418 - Privacy Act; Notification of New Privacy Act System of Records, Pre-Purchase Homeownership...

    Science.gov (United States)

    2013-01-11

    ...); prior experience completing pre-purchase counseling or education; regular access to a computer and... New Privacy Act System of Records, Pre-Purchase Homeownership Counseling Demonstration and Impact... of record is the Pre-Purchase Homeownership Counseling Demonstration and Impact Evaluation Random...

  11. A complete public archive for the Einstein IPC

    Science.gov (United States)

    Helfand, David J.

    1995-01-01

    This report documents progress made in the period 24 Sept. 1993 - 23 Sept. 1995 on the project described in our proposal 'A Complete Public Archive for the Einstein IPC' which was approved under the Astrophysics Data Program in 1992. We have completed most of the principal objectives of the original proposal; a NFE was recently approved so that costs for publications in press can be covered and we can complete the public record for the Einstein IPC database.

  12. 20 CFR 631.84 - Allowable projects.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Allowable projects. 631.84 Section 631.84... THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.84 Allowable projects...) Shall be used exclusively to provide employment on projects that provide food, clothing, shelter and...

  13. Ownership options, financing structures, and regulatory considerations affecting independent power production projects

    International Nuclear Information System (INIS)

    Knapp, G.M.

    1990-01-01

    In this paper is a framework for analysis of the legal, financing, and policy differences between independent power production projects (IPPs) and projects with qualifying facility status (QFs) under the Public Utility Regulatory Policies Act (PURPA). At a basic level, there is no fundamental difference in types of ownership and financing structures available to IPPs and QFS. The key consideration, though, is the regulatory and legal implications to project participants. Significant issues arise for equity participants, lenders, developers, and project operators that are considering IPP projects. Of course, many of these same issues apply to certain types of QF projects that are not fully exempt from the Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

  14. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  15. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  16. The Mental Health Care Act: Stakeholder compliance with respect to Section 40 of the Act.

    Directory of Open Access Journals (Sweden)

    Greg Wayne Jonsson

    2009-06-01

    Full Text Available Objective. To determine compliance with Section 40 (1-3 of the Mental Health Care Act (MHCA No 17 of 2002, viz. handing over custody by the South African Police Service (SAPS of suspected mentally ill patients to medical services at Chris Hani Baragwanath Hospital (CHBH. Methods. The study was a retrospective record review of patients who were 18 years and older, referred by SAPS to CHBH. In accordance with Section 40 of the MHCA, a MHCA form 22 is completed when suspected mentally ill patients are handed over by SAPS to the medical services. MHCA forms 22 that were completed during the period July 2007 to December 2007 were obtained from hospital records and analysed to determine the compliance of SAPS and medical practitioners in completing them. Results. During the study period, 708 of the 718 patients handed over by SAPS to the Emergency Department of CHBH were entered on MHCA forms 22. SAPS officials had correctly completed 86% of the forms, whereas the medical practitioners had only correctly completed 9.9% of the forms. Of the 718 patients handed over by SAPS, 319 (44% were discharged for outpatient care. Conclusion. The findings of this study suggest that not all parties fully comply with Section 40 of the Mental Health Care Act No 17 of 2002. We suggest that the situation can be improved by training of all parties; amendments to the MHCA form 22; partnership between mental health care practitioners and members of SAPS; and combining resources towards implementing a crisis intervention model similar to that in other countries.

  17. Leadership models with an emphasis on relationships and the completion of the project in information science

    Science.gov (United States)

    Damaskinou, Aikaterini I.; Drivas, Ioannis C.; Sakas, Damianos P.

    2015-02-01

    While attempting decision-making in leadership, one of the criteria that should be considered is the actual behavior of the leader towards the work group. The object of this study is the prevalence of two key leadership models, the Task Behavior and the Relationship Behavior. Firstly, the leader's behavior is focused on completing the project combined with a leadership style which is more interventionist and less conciliatory. The second leadership model focuses on working relationships, developed between leaders and employees. In this case, the character of the model is associated with a leadership behavior more supportive, motivating and participative. This article refers to the characteristics of the two models and the mechanisms and strategies that can be adopted in both leadership behaviors. Furthermore, through the research which took place, we have come to conclusions regarding the public's views about the different leadership behaviors and, also, the possibility of combining the two styles of leadership.

  18. Ensuring America's Future by Increasing Latino College Completion: Latino College Completion in 50 States. Executive Summary

    Science.gov (United States)

    Santiago, Deborah; Soliz, Megan

    2012-01-01

    In 2009, Excelencia in Education launched the Ensuring America's Future initiative to inform, organize, and engage leaders in a tactical plan to increase Latino college completion. This initiative included the release of a benchmarking guide for projections of degree attainment disaggregated by race/ethnicity that offered multiple metrics to track…

  19. Straightforward and complete deposition of NMR data to the PDBe

    International Nuclear Information System (INIS)

    Penkett, Christopher J.; Ginkel, Glen van; Velankar, Sameer; Swaminathan, Jawahar; Ulrich, Eldon L.; Mading, Steve; Stevens, Tim J.; Fogh, Rasmus H.; Gutmanas, Aleksandras; Kleywegt, Gerard J.; Henrick, Kim; Vranken, Wim F.

    2010-01-01

    We present a suite of software for the complete and easy deposition of NMR data to the PDB and BMRB. This suite uses the CCPN framework and introduces a freely downloadable, graphical desktop application called CcpNmr Entry Completion Interface (ECI) for the secure editing of experimental information and associated datasets through the lifetime of an NMR project. CCPN projects can be created within the CcpNmr Analysis software or by importing existing NMR data files using the CcpNmr FormatConverter. After further data entry and checking with the ECI, the project can then be rapidly deposited to the PDBe using AutoDep, or exported as a complete deposition NMR-STAR file. In full CCPN projects created with ECI, it is straightforward to select chemical shift lists, restraint data sets, structural ensembles and all relevant associated experimental collection details, which all are or will become mandatory when depositing to the PDB. Instructions and download information for the ECI are available from the PDBe web site at http://www.ebi.ac.uk/pdbe/nmr/deposition/eci.htmlhttp://www.ebi.ac.uk/pdbe/nmr/deposition/eci.html.

  20. 7 CFR 1290.6 - Completed application.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Completed application. 1290.6 Section 1290.6 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... condition that is external to the project and that is of direct importance to the intended beneficiaries and...

  1. 77 FR 12553 - Sunshine Act Meetings

    Science.gov (United States)

    2012-03-01

    ... COMMISSION ON CIVIL RIGHTS Sunshine Act Meetings AGENCY: United States Commission on Civil Rights... Discussion of Projects: VRA Statutory Enforcement Report Update Human Trafficking Briefing Update Immigration... Discussion on Agency Staffing V. State Advisory Committee Issues: Review of two Hawaii SAC applicants Re...

  2. 76 FR 3608 - Sunshine Act Notice

    Science.gov (United States)

    2011-01-20

    .... Disparate Impact in School Discipline Policies. Gender and the Wage Gap. Title IX--Sex Discrimination in Liberal Arts College Admissions. Eminent Domain Project. NBPP. V. State Advisory Committee Issues... COMMISSION ON CIVIL RIGHTS Sunshine Act Notice AGENCY: United States Commission on Civil Rights...

  3. Rescue the problem project: a complete guide to identifying, preventing, and recovering from project failure

    National Research Council Canada - National Science Library

    Williams, Todd C

    2011-01-01

    ... vii American Management Association www.amanet.orgviii Contents Creating the Assignment's Statement of Work Defining the Responsibilities by Phase in the SOW Establishing the Recovery Manager's Authority Accepting the Role as a Recovery Manager Creating an Outline of the Recovery Chapter Takeaway 24 25 28 28 29 30 PART II Auditing the Project: Unde...

  4. 78 FR 7775 - Boulder Canyon Project

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area...), is proposing an adjustment to the Boulder Canyon Project (BCP) electric service base charge and rates... subsequent laws, particularly section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and...

  5. Department of Energy Recovery Act Investment in Biomass Technologies

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-11-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided more than $36 billion to the Department of Energy (DOE) to accelerate work on existing projects, undertake new and transformative research, and deploy clean energy technologies across the nation. Of this funding, $1029 million is supporting innovative work to advance biomass research, development, demonstration, and deployment.

  6. COMPLETE VEHICLE PROTECTION USING AT MEGA MICRO CONTROLLER

    OpenAIRE

    S. Satheeshkumar; S. Vimalnath; G. Nandhakumar

    2017-01-01

    The Primary aim of this Project is to design the project for a Complete Vehicle Protection with Embedded Technology. In this project there are two sections, one is a vehicle unit another one is a monitoring unit. In a vehicle unit Accident is measured with the help of vibration sensor. Temperature is measured with the help of temperature sensor. Fuel Level measurement using Float. Those sensor’s output is given to the amplifier unit. After the amplification this output is given to the ATMEGA ...

  7. 50 CFR 253.22 - State projects.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false State projects. 253.22 Section 253.22... State projects. (a) General—(1) Designation of state agency. The Governor of each state shall notify the... participation under the Act, to sign project documents, and to receive payments. (2) States that choose to...

  8. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  9. Final Scientific/Technical Report [Recovery Act: Districtwide Geothermal Heating Conversion

    Energy Technology Data Exchange (ETDEWEB)

    Chatterton, Mike [McKinstry, Meridian, ID (United States)

    2014-02-12

    The Recovery Act: Districtwide Geothermal Heating Conversion project performed by the Blaine County School District was part of a larger effort by the District to reduce operating costs, address deferred maintenance items, and to improve the learning environment of the students. This project evaluated three options for the ground source which were Open-Loop Extraction/Re-injection wells, Closed-Loop Vertical Boreholes, and Closed-Loop Horizontal Slinky approaches. In the end the Closed-Loop Horizontal Slinky approach had the lowest total cost of ownership but the majority of the sites associated with this project did not have enough available ground area to install the system so the second lowest option was used (Open-Loop). In addition to the ground source, this project looked at ways to retrofit existing HVAC systems with new high efficiency systems. The end result was the installation of distributed waterto- air heat pumps with water-to-water heat pumps installed to act as boilers/chillers for areas with a high ventilation demand such as they gymnasiums. A number of options were evaluated and the lowest total cost of ownership approach was implemented in the majority of the facilities. The facilities where the lowest total cost of ownership approaches was not selected were done to maintain consistency of the systems from facility to facility. This project had a number of other benefits to the Blaine County public. The project utilizes guaranteed energy savings to justify the levy funds expended. The project also developed an educational dashboard that can be used in the classrooms and to educate the community on the project and its performance. In addition, the majority of the installation work was performed by contractors local to Blaine County which acted as an economic stimulus to the area during a period of recession.

  10. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  11. Critical management issues for the Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    Themelis, J.G.; Krishnan, K.R.

    1985-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (PL95-604) authorized the Secretary of Energy to enter into cooperative agreements with certain states and Indian Tribes to clean up 24 inactive uranium mill tailing sites and associated vicinity properties. The Uranium Mill Tailings Remedial Action (UMTRA) Project includes the three Federal agencies (EPA, DOE, and NRC), eleven state, Indian Tribes, and at least four major contractors. The UMTRA Project extends over a period of ten years. The standards for the Project require a design life of 1000 years with a minimum performance period of 200 years. This paper discusses the critical management issues in dealing with the UMTRA Project and identifies the development of solutions for many of those issues. The highlights to date are promulgation of EPA standards, continued support from Congress and participating states and Indian Tribes, significant leadership shown at all levels, establishment of credibility with the public, and continued motivation of the team. The challenge for tomorrow is making certain NRC will license the sites and maintaining the high level of coordination exhibited to date to assure Project completion on schedule

  12. Day-care treatment for multiple drug abusing adolescents: social factors linked with completing treatment.

    Science.gov (United States)

    Feigelman, W

    1987-01-01

    By identifying some of the social correlates linked with completing day-care drug abuse treatment, the present study has sought to broaden understanding of how drug rehabilitations are effected. As the findings have demonstrated, completing care is a result of a complex array of causes and their interaction. The disposition of the entering patient (i.e., their determination and other strengths) has a great bearing on treatment outcome. It is also a result of the patient's family, their motivations, resources and perseverance in enduring a long course of demanding therapeutic interventions. In addition, it is the product of meanings shared and transmitted between the patient's family and the treatment staff. Patients and their families project positive attitudes about the value of the therapeutic enterprise as well as a compliant demeanor. As staff recognize that patients and parents are acting cooperatively, then such perceptions tend to create self-fulfilling prophecies. The data has established that older adolescent patients are more likely to possess the motivational resources needed for program completion than younger patients. Apparently, self-referred patients are also more inclined to meet the demands of program requirements than those referred by the courts or other outside social agencies, although the differences fell short of the .05 level of statistical significance. Those completing the program are less likely to be diagnosed as depressed at intake. Parental characteristics comprise another group of variables that are related to treatment completion. Parents of higher occupational rank, who have had mental health care for themselves, and who are of Jewish ethnicity appear to possess useful strengths for meeting program challenges. The pattern of spouse mutuality in dealing with a child's needs as it exists preceding and during treatment seems to be another useful asset for successfully getting through this form of treatment. While parents with the

  13. The clause against tax avoidance in the Guidelines of the project on the change of the Tax Ordinance Act of April 2013

    Directory of Open Access Journals (Sweden)

    Marta Gordon

    2013-12-01

    Full Text Available The demand to tighten tax regulations has been updated on both international and domestic level due to the fact that taxpayers are increasingly using aggressive practices of tax avoidance. For this reason, the Minister of Finance formulated and published on the 30th April 2013 the Guidelines of the project on the change of the Tax Ordinance Act. According to the suggestions included therein, introduced to the Tax Ordinance Act would be the clause against tax avoidance along with instruments protecting taxpayers’ interests in the process of applying the aforementioned clause. The study includes a critical discussion of the solutions suggested by the Minister of Finance also in terms of problems which may arise in the process of their practical application. Reservations have mainly been made about both the project’s compliance with the Constitution, since the criteria of the clause application are too general, and formal imperfection of the regulations suggested.

  14. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    International Nuclear Information System (INIS)

    Beranich, S.J.

    1994-01-01

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed for mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process

  15. Connection between complete and Möbius forms of gauge invariant operators

    International Nuclear Information System (INIS)

    Fadin, V.S.; Fiore, R.; Grabovsky, A.V.; Papa, A.

    2012-01-01

    We study the connection between complete representations of gauge invariant operators and their Möbius representations acting in a limited space of functions. The possibility to restore the complete representations from Möbius forms in the coordinate space is proven and a method of restoration is worked out. The operators for transition from the standard BFKL kernel to the quasi-conformal one are found both in Möbius and total representations.

  16. 76 FR 6497 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Industrial...

    Science.gov (United States)

    2011-02-04

    ..., 15 U.S.C. 4301 et seq. (``the Act''), Industrial Nacromolecular Crystallography Association (``INCA... activity of the group research project. Membership in this group research project remains open, and INCA..., INCA filed its original notification pursuant to Section 6(a) of the Act. The Department of Justice...

  17. The European Model Company Act

    DEFF Research Database (Denmark)

    Cleff, Evelyne Beatrix

    2011-01-01

    European Company Law regulation is currently undergoing a reform. These reforms raise a number of regulatory questions, such as what should be the aims of companies' legislation, and how these aims should best be met by regulation. Many of the reforms and discussions (both on EU and national level...... an increasing influence on the framing of company legislation, such as the choice between mandatory or default rules. This article introduces the project 'European Company Law and the choice of Regulatory Method' which is carried out in collaboration with the 'European Model Company Act Group'. The project aims...

  18. The Dutch Crisis and Recovery Act: Economic Recovery and Legal Crisis?

    Directory of Open Access Journals (Sweden)

    J Verschuuren

    2010-12-01

    Full Text Available In the Netherlands, the 2010 Crisis and Recovery Act aims at speeding up decisionmaking on a wide variety of activities, hoping that after the financial and economic crisis has passed, development projects can immediately be carried out without any delay caused by legal procedures in court or elsewhere. The Act meets great criticism for many reasons: it allegedly curtails citizen's procedural rights because it focuses almost exclusively on environmental standards as "obstructing" standards that need to be removed, and it infringes international and European Union law. In this note, the legal critique on the Act is analysed. The conclusion is that the sense of urgency surrounding the design of legal measures to address the economic crisis enables the legislature to implement innovations and long-time pending amendments to existing legislation. Most issues have however not been fully or properly considered. Many legal questions will arise when implementing the Act, which will retard rather than expedite projects. It is difficult to predict whether the positive effects of the Crisis and Recovery Act would outweigh the negative aspects. Much depends on the manner in which the authorities will actually apply the Act. Should they implement the Act to its full potential, the effect of the Act in sum will be negative. In that case, the Act may help the economy to recover, but it will bring about a crisis in the legal system. It will, in all probability, also not contribute to sustainable development.

  19. The Dutch "Crisis and Recovery Act": Economic recovery and legal ...

    African Journals Online (AJOL)

    In the Netherlands, the 2010 Crisis and Recovery Act aims at speeding up decisionmaking on a wide variety of activities, hoping that after the financial and economic crisis has passed, development projects can immediately be carried out without any delay caused by legal procedures in court or elsewhere. The Act meets ...

  20. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  1. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  2. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  3. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  4. Public Utility Holding Company Act of 1935: 1935--1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-15

    This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry. The report should be of use to Federal and State regulators, trade associations, electric utilities, independent power producers, as well as decision-makers in Congress and the Administration.

  5. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  6. Omission, Suggestion, Completion : Film and the Imagination of the Spectator

    NARCIS (Netherlands)

    Hanich, Julian

    2018-01-01

    This article counters the widespread assumption that film is exclusively a medium of showing, presentation or appearing by emphasizing the importance of the viewer’s act of imagination. At the center of attention is the aesthetic principle of omission, suggestion, and completion in film – in other

  7. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Science.gov (United States)

    2011-10-12

    ... 2010, which authorizes projects approved for financing under Title V of the Small Business Investment...). See 76 FR 9213. This provision of the Jobs Act temporarily authorizes projects approved for financing... the Refinancing Project. Such financing will be available only if the amount of cash that will be...

  8. PRIMAVERA - the experience of the utilization at the completion MO34

    International Nuclear Information System (INIS)

    Porubsky, S.

    2009-01-01

    Today, it is not possible to provide the required quality of neither the process nor the project's outputs without suitable software management support. It is necessary to remember, that the software management support of the big projects is necessary, not just sufficient condition for successful implementation of the project. The following contribution describes the experience with the software support setting for completion project of units 3. and 4. of NPP Mochovce

  9. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  10. 78 FR 25471 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-05-01

    ....R50000] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains and associated funerary objects, in... Burke Museum acting on behalf of the University of Washington, Department of Anthropology. Disposition...

  11. 78 FR 5200 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-01-24

    ... Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA AGENCY: National... Anthropology, has completed an inventory of human remains and associated funerary objects, in consultation with... acting on behalf of the University of Washington, Department of Anthropology. Disposition of the human...

  12. 78 FR 19297 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-03-29

    ...-PPWOCRADN0] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains and associated funerary objects, in... Burke Museum acting on behalf of the University of Washington, Department of Anthropology. Disposition...

  13. Improving Homework Completion and Motivation of Middle School Students through Behavior Modification, Graphing, and Parent Communication

    Science.gov (United States)

    Hein, Dawn L.; Wimer, Sandra L.

    2007-01-01

    An action research project report was complete to discuss how homework completion and motivation is an ongoing issue and debate within the public schools. This is especially true in the middle school setting. The teacher researchers of this project chose to conduct a study in order to increase homework completion and motivation of middle school…

  14. Topography of the complete corticopontine projection: From experiments to principal maps

    Directory of Open Access Journals (Sweden)

    Trygve B Leergaard

    2007-10-01

    Full Text Available The mammalian brain is characterized by orderly spatial distribution of its cellular components, commonly referred to as topographical organization. The topography of cortical and subcortical maps is thought to represent functional or computational properties. In the present investigation, we have studied map transformations and organizing principles in the projections from the cerebral cortex to the pontine nuclei, with emphasis on the mapping of the cortex as a whole onto the pontine nuclei. Following single or multiple axonal tracer injections into different cortical regions, three-dimensional (3-D distributions of anterogradely labeled axons in the pontine nuclei were mapped. All 3-D reconstructed data sets were normalized to a standardized local coordinate system for the pontine nuclei and uploaded in a database application (FACCS, Functional Anatomy of the Cerebro-Cerebellar System, available via The Rodent Brain Workbench, http://www.rbwb.org. The database application allowed flexible use of the data in novel combinations, and use of a previously published data sets. Visualization of different combinations of data was used to explore alternative principles of organization. As a result of these analyses, a principal map of the topography of corticopontine projections was developed. This map followed the organization of early spatiotemporal gradients present in the cerebral cortex and the pontine nuclei. With the principal map for corticopontine projections, a fairly accurate prediction of pontine target area can be made for any site of origin in the cerebral cortex. The map and the underlying shared data sets represent a basis for modeling of topographical organization and structure-function relationships in this system.

  15. Risk management solutions for Cernavoda Unit #2 NPP completion

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.

    2002-01-01

    The greatest risk facing today's electric utilities is change. Utility risk managers are being challenged to address the changes of deregulation, new technologies and changing work force. The utilities must be more aware of where all its costs are located to face with the challenge of competition, forcing them to respond with lower prices and innovative services. For completion of large projects, like Cernavoda NPP, Unit 2, the utilities are facing also with certain specific risks: politic, economic, social. The natural perils or machinery breakdown are common risks for operation as well as for construction-commissioning projects. Beyond the explicit challenges associated with the completion of a nuclear power plant in a transition economy environment, the utilities are facing with new risk factors such as professional liability, political risk, product warranty and liability, international exposure, etc. Changes in other governmental policies are also affecting large projects, mentioning healthcare, workplace safety, workers' compensation, environmental clean up, etc.(author)

  16. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  17. Ensuring sustained ACT production and reliable artemisinin supply

    Directory of Open Access Journals (Sweden)

    Olliaro Piero

    2007-09-01

    Full Text Available Abstract Introduction This paper reviews recent trends in the production, supply and price of the active ingredients as well as finished ACT products. Production and cost data provided in this paper are based on an ongoing project (Artepal. Stability data are derived from a development project on rectal artesunate. Discussion The artemisinin raw material and its derivatives appear to be very stable compared to the finished products. Supply of artemisinin changed in May 2004 when the Global Fund shifted financial support to qualified countries from chloroquine or sulphadoxine-pyrimethamine to an ACT for treatment of malaria. First, there was a sudden shortage of the starting material, and short term scarcity led to a steep rise in API price: it increased dramatically in 2004, from $350 per kg to more than $1000. Second, there was a parallel increase in the number of companies extracting artemisinin from 10 to 80 between 2003 and 2005 in China, and from 3 to 20 in Vietnam. Commercial cultivation began also in East Africa and Madagascar. A steady and predictable demand for the crop can eliminate such wide fluctuations and indirectly contribute to price stability of the herb, the API and ACT. With appropriate mechanisms to reduce those fluctuations, the cost of artemisinin might decrease sustainably to US$ 250–300 per kg. Conclusion Today the global health community is facing the risk of another cyclical swing with lower demand feeding into reduced planting of A. annua and, thereafter, a new shortage of the raw material and higher API prices. International donors, the largest purchasers for ACTs could better coordinate their activities, in order to guarantee purchase of ACTs and consequently of API with manufacturers. In parallel, the base of quality producers of APIs and finished ACT products needs to be broadened. While the ACT programme is still in its early stages, the consequences of another wave of artemisinin and ACT shortages would

  18. Ensuring sustained ACT production and reliable artemisinin supply.

    Science.gov (United States)

    Kindermans, Jean-Marie; Pilloy, Jacques; Olliaro, Piero; Gomes, Melba

    2007-09-15

    This paper reviews recent trends in the production, supply and price of the active ingredients as well as finished ACT products. Production and cost data provided in this paper are based on an ongoing project (Artepal). Stability data are derived from a development project on rectal artesunate. The artemisinin raw material and its derivatives appear to be very stable compared to the finished products. Supply of artemisinin changed in May 2004 when the Global Fund shifted financial support to qualified countries from chloroquine or sulphadoxine-pyrimethamine to an ACT for treatment of malaria. First, there was a sudden shortage of the starting material, and short term scarcity led to a steep rise in API price: it increased dramatically in 2004, from $350 per kg to more than $1000. Second, there was a parallel increase in the number of companies extracting artemisinin from 10 to 80 between 2003 and 2005 in China, and from 3 to 20 in Vietnam. Commercial cultivation began also in East Africa and Madagascar.A steady and predictable demand for the crop can eliminate such wide fluctuations and indirectly contribute to price stability of the herb, the API and ACT. With appropriate mechanisms to reduce those fluctuations, the cost of artemisinin might decrease sustainably to US$ 250-300 per kg. Today the global health community is facing the risk of another cyclical swing with lower demand feeding into reduced planting of A. annua and, thereafter, a new shortage of the raw material and higher API prices. International donors, the largest purchasers for ACTs could better coordinate their activities, in order to guarantee purchase of ACTs and consequently of API with manufacturers. In parallel, the base of quality producers of APIs and finished ACT products needs to be broadened.While the ACT programme is still in its early stages, the consequences of another wave of artemisinin and ACT shortages would permanently discredit it and impede any progress in rolling malaria back.

  19. Evaluating the completeness of the national ALS registry, United States.

    Science.gov (United States)

    Kaye, Wendy E; Wagner, Laurie; Wu, Ruoming; Mehta, Paul

    2018-02-01

    Our objective was to evaluate the completeness of the United States National ALS Registry (Registry). We compared persons with ALS who were passively identified by the Registry with those actively identified in the State and Metropolitan Area ALS Surveillance project. Cases in the two projects were matched using a combination of identifiers, including, partial social security number, name, date of birth, and sex. The distributions of cases from the two projects that matched/did not match were compared and Chi-square tests conducted to determine statistical significance. There were 5883 ALS cases identified by the surveillance project. Of these, 1116 died before the Registry started, leaving 4767 cases. We matched 2720 cases from the surveillance project to those in the Registry. The cases identified by the surveillance project that did not match cases in the Registry were more likely to be non-white, Hispanic, less than 65 years of age, and from western states. The methods used by the Registry to identify ALS cases, i.e. national administrative data and self-registration, worked well but missed cases. These findings suggest that developing strategies to identify and promote the Registry to those who were more likely to be missing, e.g. non-white and Hispanic, could be beneficial to improving the completeness of the Registry.

  20. 78 FR 22286 - Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA

    Science.gov (United States)

    2013-04-15

    ....R50000] Notice of Inventory Completion: University of Washington, Department of Anthropology, Seattle, WA..., Department of Anthropology, has completed an inventory of human remains, in consultation with the appropriate... acting on behalf of the University of Washington, Department of Anthropology. If no additional requestors...

  1. ReconnACT Blumenthal to the water

    NARCIS (Netherlands)

    Restemeyer, Britta; Motta Zanin, Giulia; Kötterheinrich, Marie; Chan Lok Hei, Patricia; Warsewa, Günter; Mironowicz, Izabela

    2016-01-01

    The project “ReconnACT Blumenthal to the water” is a concept for a particular area in the north of Bremen, Blumenthal, which is currently in a transition phase from an industrial to a post-industrial urban district. In line with the general theme of the summer school, “City on Water”, making

  2. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  3. Carbon dioxide cleaning pilot project

    International Nuclear Information System (INIS)

    Knight, L.; Blackman, T.E.

    1994-01-01

    In 1989, radioactive-contaminated metal at the Rocky Flats Plant (RFP) was cleaned using a solvent paint stripper (Methylene chloride). One-third of the radioactive material was able to be recycled; two-thirds went to the scrap pile as low-level mixed waste. In addition, waste solvent solutions also required disposal. Not only was this an inefficient process, it was later prohibited by the Resource Conservation and Recovery Act (RCRA), 40 CFR 268. A better way of doing business was needed. In the search for a solution to this situation, it was decided to study the advantages of using a new technology - pelletized carbon dioxide cleaning. A proof of principle demonstration occurred in December 1990 to test whether such a system could clean radioactive-contaminated metal. The proof of principle demonstration was expanded in June 1992 with a pilot project. The purpose of the pilot project was three fold: (1) to clean metal so that it can satisfy free release criteria for residual radioactive contamination at the Rocky Flats Plant (RFP); (2) to compare two different carbon dioxide cleaning systems; and (3) to determine the cost-effectiveness of decontamination process in a production situation and compare the cost of shipping the metal off site for waste disposal. The pilot project was completed in August 1993. The results of the pilot project were: (1) 90% of those items which were decontaminated, successfully met the free release criteria , (2) the Alpheus Model 250 was selected to be used on plantsite and (3) the break even cost of decontaminating the metal vs shipping the contaminated material offsite for disposal was a cleaning rate of 90 pounds per hour, which was easily achieved

  4. 细化项目竣工验收流程,提升基建财务管理水平%Refining Project Completion Acceptance Process,Enhancing the Level of Infrastructure Financial Management

    Institute of Scientific and Technical Information of China (English)

    李斌

    2012-01-01

    In this paper, aiming at the possible risks for the enterprise acceptance phase of the technological transformation project, combined with requirements of five principles of internal control, reasonable suggestions are proposed, focusing on the management portion of the financial internal control involved in two phases of completion settlement and final accounts of completion, so as to refine project completion and acceptance process, conduct the final accounts of completion in time, and enhance the infrastructure financial management performance.%本文主要针对企业技改项目验收阶段中可能遇到的风险,结合内部控制五原则的要求,着重从竣工结算、竣工决算两个阶段中涉及财务内控管理部分,提出几点合理化建议,细化项目竣工验收工作流程,及时办理竣工决算,提升基建财务管理效能.

  5. Resource Conservation and Recovery Act ground-water monitoring projects for Hanford Facilities: Progress report for the period July 1 to September 30, 1989 - Volume 1 - Text

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-12-01

    This is Volume 1 of a two-volume document that describes the progress of 14 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1989. This volume discusses the projects; Volume 2 provides as-built diagrams, completion/inspection reports, drilling logs, and geophysical logs for wells drilled, completed, or logged during this period. Volume 2 can be found on microfiche in the back pocket of Volume 1. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the sampled aquifer meets regulatory standards for drinking water quality.

  6. Collaborating with EPA through the Federal Technology Transfer Act

    Science.gov (United States)

    Under the Federal Technology Transfer Act (FTTA), EPA can collaborate with external parties on research projects, and share research materials. Learn more about the types of partnerships the EPA offers.

  7. 75 FR 23807 - Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO

    Science.gov (United States)

    2010-05-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO AGENCY: National Park Service, Interior. ACTION: Notice. Notice is here given in accordance with the Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of...

  8. 75 FR 5627 - Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO

    Science.gov (United States)

    2010-02-03

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO AGENCY: National Park Service, Interior. ACTION: Notice. Notice is here given in accordance with the Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of...

  9. 75 FR 42770 - Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO AGENCY: National Park Service, Interior. ACTION: Notice. Notice is here given in accordance with the Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of...

  10. 75 FR 70027 - Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO

    Science.gov (United States)

    2010-11-16

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO AGENCY: National Park Service, Interior. ACTION: Notice. Notice is here given in accordance with the Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an...

  11. 40 CFR 35.930-4 - Project scope.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project scope. 35.930-4 Section 35.930... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.930-4 Project scope. The grant agreement must define the scope of the project for which Federal assistance is awarded...

  12. Communication Scaffolds for Project Management in PBL

    Science.gov (United States)

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  13. Loop quantum cosmology of the Bianchi I model: complete quantization

    International Nuclear Information System (INIS)

    Martín-Benito, M; Garay, L J; Mena Marugán, G A; Wilson-Ewing, E

    2012-01-01

    We complete the canonical quantization of the vacuum Bianchi I model within the improved dynamics scheme of loop quantum cosmology, characterizing the Hilbert structure of the physical states and providing a complete set of observables acting on them. In order to achieve this task, it has been essential to determine the structure of the separable superselection sectors that arise owing to the polymeric quantization, and to prove that the initial value problem obtained when regarding the Hamiltonian constraint as an evolution equation, interpreting the volume as the evolution parameter, is well-posed.

  14. Pragmatic Acts In HIV/AIDS Social Management Advertisements

    Directory of Open Access Journals (Sweden)

    Toyin Makinde

    2014-09-01

    Full Text Available Studies on the social management of HIV and AIDS have focused on how awareness about HIV and AIDS has been created through organised and interpersonal communication. These studies have not investigated context-constrained language use in the advertisements on the disease despite the wide coverage and potential effectiveness of the public sensitisation about HIV and AIDS. This study, therefore, investigated the pragmatic features of language in selected HIV and AIDS management advertisements with a view to identifying the pragmatic acts of the language. Aspects of pragmatic act theory, noted for negotiability of meaning context based interactional situations was adopted for the research. All the 25 advertisements broadcast between December 2006 and June 2009, to all African countries on both private and government-owned television stations in Nigeria by an International non-governmental agency known as 'it begins with you' (YOU constituted the data. Fifty–four utterances were generated from the adverts and were subjected to qualitative analysis and reported in simple percentages. Six pragmatic functions manifested in the advertisements: Co-opting and Projecting were realised through inference (INF, shared situational knowledge (SSK and relevance (REL to bring the audience into the war against HIV/AIDS. Encouraging and Emboldening were projected through SSK and INF to motivate the audience to go for HIV test and speak openly about the virus. Instigating was done using indirect speech act to empower the female against discrimination and stigmatisation. Advising was achieved through SSK and INF to promote fidelity and safe sexual behaviour. The analysis of YOU advertisements through pragmatic act theory presupposes that pragmatic functions were exploited by the advertisers to sensitise the audience, promote social ties and project into an HIV free generation.

  15. State of Nevada, Agency for Nuclear Projects/Nuclear Waste Project Office narrative report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) is the State of Nevada agency designated by State law to monitor and oversee US Department of Energy (DOE) activities relative to the possible siting, construction, operation and closure of a high-level nuclear waste repository at Yucca Mountain and to carry out the State of Nevada's responsibilities under the Nuclear Waste Policy Act of 1982. During the reporting period the NWPO continued to work toward the five objectives designed to implement the Agency's oversight responsibilities: (1) Assure that the health and safety of Nevada's citizens are adequately protected with regard to any federal high-level radioactive waste program within the State; (2) Take the responsibilities and perform the duties of the State of Nevada as described in the Nuclear Waste Policy Act of 1982 (Public Law 97-425) and the Nuclear Waste Policy Amendments Act of 1987; (3) Advise the Governor, the State Commission on Nuclear Projects and the Nevada State Legislature on matters concerning the potential disposal of high-level radioactive waste in the State; (4) Work closely and consult with affected local governments and State agencies; (5) Monitor and evaluate federal planning and activities regarding high-level radioactive waste disposal. Plan and conduct independent State studies regarding the proposed repository

  16. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  17. The complete atlas of wind farms and projects in France

    International Nuclear Information System (INIS)

    Le Jannic, N.; Guillier, A.

    2012-01-01

    932 wind farms are in operation or in project at the end of the first semester of 2012 in France. Wind energy continues increasing, the total installed power reaches 7182 MW and about 738 MW have been installed during the last 12 months. This document lists all these wind farms and gives some information like the locality, the name of the operator, the power installed, the number of turbines, the name of the turbine manufacturer and the past or future date of commissioning. (A.C.)

  18. Reverse Discourse Completion Task as an Assessment Tool for Intercultural Competence

    Science.gov (United States)

    Kanik, Mehmet

    2013-01-01

    This paper proposes a prototypic assessment tool for intercultural communicative competence. Because traditional discourse completion tasks (DCTs) focus on illocutionary competence rather than sociolinguistic competence, a modified version of a DCT was created to target sociolinguistic competence. The modified DCT employs speech acts as prompts…

  19. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  20. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  1. Special Project Grants Awarded for Improvement in Nurse Training. A Listing.

    Science.gov (United States)

    National Institutes of Health (DHEW), Bethesda, MD. Div. of Nursing.

    This current directory lists alphabetically by state, special projects funded by the Title II Nurse Training Act of the Health Manpower Act of 1968, which are awarded for improvement programs in nurse training. Projects funded through June 1971 are listed and briefly annotated, including planning grants awarded for the first time during the fiscal…

  2. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  3. 78 FR 78378 - Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Grant...

    Science.gov (United States)

    2013-12-26

    ... Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of human remains under the control....R50000] Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Grant... Historic Site has completed an inventory of human remains, in consultation with the appropriate Indian...

  4. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  5. Atomic Energy Amendment Act 1987 - No 5 of 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This Act modifies substantially the Atomic Energy Act 1953 as already amended. It repeals almost all of the existing Atomic Energy Act, including the provisions establishing the Australian Atomic Energy Commission and the security provisions. A new authority is created under separate legislation to replace the Commission: the Australian Nuclear Science and Technology Organization. The only parts of the Act which remain are the sections covering the authorization of the Ranger Project and the Commonwealth title to uranium in the Northern Territory; and the requirement for reporting of discoveries of prescribed substances (uranium, thorium, i.e. any substance which may be used for production of atomic energy) and information on their production. Certain definitions have also been kept. (NEA) [fr

  6. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using

  7. Clean Air Act. Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-15

    This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

  8. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  9. 76 FR 38124 - Applications for New Awards; Americans With Disabilities Act (ADA) National Network Regional...

    Science.gov (United States)

    2011-06-29

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Americans With Disabilities Act (ADA) National Network Regional Centers and ADA National Network Collaborative Research Projects AGENCY: Office... Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Projects (DRRP)--ADA...

  10. Small business innovation research. Abstracts of completed 1987 phase 1 projects

    Science.gov (United States)

    1989-01-01

    Non-proprietary summaries of Phase 1 Small Business Innovation Research (SBIR) projects supported by NASA in the 1987 program year are given. Work in the areas of aeronautical propulsion, aerodynamics, acoustics, aircraft systems, materials and structures, teleoperators and robotics, computer sciences, information systems, spacecraft systems, spacecraft power supplies, spacecraft propulsion, bioastronautics, satellite communication, and space processing are covered.

  11. Agency for Nuclear Projects/Nuclear Waste Project Office final progress report

    International Nuclear Information System (INIS)

    1992-01-01

    The Nevada Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) was formally established by Executive Policy in 1983 following passage of the federal Nuclear Waste Policy Act of 1982 (Act). That Act provides for the systematic siting, construction, operation, and closure of high-level radioactive defense and research by-products and other forms of high-level radioactive waste from around the country which will be stored at such repositories. In 1985 the Nevada legislature formally established the NWPO as a distinct and statutorily authorized agency to provide support to the Governor and State Legislature on matters concerning the high-level nuclear waste programs. The NWPO utilized a small, central staff supplemented by contractual services for needed technical and specialized expertise in order to provide high quality oversight and monitoring of federal activities, to conduct necessary independent studies, and to avoid unnecessary duplication of efforts. This report summarizes the results of this ongoing program to ensure that risks to the environment and to human safety are minimized. It includes findings in the areas of hydrogeology, geology, quality assurance activities, repository engineering, legislature participation, socioeconomic affects, risk assessments, monitoring programs, public information dissemination, and transportation activities. The bulk of the reporting deals with the Yucca Mountain facility

  12. 30 CFR 203.66 - What happens if MMS does not act in the time allowed?

    Science.gov (United States)

    2010-07-01

    ... Relief for Pre-Act Deep Water Leases and for Development and Expansion Projects § 203.66 What happens if MMS does not act in the time allowed? If we do not act within the timeframes established under § 203... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What happens if MMS does not act in the time...

  13. 3D Printing the Complete CubeSat

    Science.gov (United States)

    Kief, Craig

    2015-01-01

    The 3D Printing the Complete CubeSat project is designed to advance the state-of-the-art in 3D printing for CubeSat applications. Printing in 3D has the potential to increase reliability, reduce design iteration time and provide greater design flexibility in the areas of radiation mitigation, communications, propulsion, and wiring, among others. This project is investigating the possibility of including propulsion systems into the design of printed CubeSat components. One such concept, an embedded micro pulsed plasma thruster (mPPT), could provide auxiliary reaction control propulsion for a spacecraft as a means to desaturate momentum wheels.

  14. 75 FR 28648 - Notice of Inventory Completion: Peabody Museum of Archaeology and Ethnology, Harvard University...

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Peabody Museum of... Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of human remains in the possession of... finding a copper vessel and other ``small articles'' with the human remains. However, these items were not...

  15. Nodule detection in digital chest radiography: Part of image background acting as pure noise

    International Nuclear Information System (INIS)

    Baath, M.; Haakansson, M.; Boerjesson, S.; Kheddache, S.; Grahn, A.; Bochud, F. O.; Verdun, F. R.; Maansson, L. G.

    2005-01-01

    There are several factors that influence the radiologist's ability to detect a specific structure/lesion in a radiograph. Three factors that are commonly known to be of major importance are the signal itself, the system noise and the projected anatomy. The aim of this study was to determine to what extent the image background acts as pure noise for the detection of subtle lung nodules in five different regions of the chest. A receiver operating characteristic (ROC) study with five observers was conducted on two different sets of images, clinical chest X-ray images and images with a similar power spectrum as the clinical images but with a random phase spectrum, resulting in an image background containing pure noise. Simulated designer nodules with a full-width-at-fifth-maximum of 10 mm but with varying contrasts were added to the images. As a measure of the part of the image background that acts as pure noise, the ratio between the contrast needed to obtain an area under the ROC curve of 0.80 in the clinical images to that in the random-phase images was used. The ratio ranged from 0.40 (in the lateral pulmonary regions) to 0.83 (in the hilar regions) indicating that there was a large difference between different regions regarding to what extent the image background acted as pure noise; and that in the hilar regions the image background almost completely acted as pure noise for the detection of 10 mm nodules. (authors)

  16. The National Historic Preservation Act is Not Your Problem, But How You are Addressing it for Your CERCLA Project May Be - 12344

    Energy Technology Data Exchange (ETDEWEB)

    Cusick, Lesley T. [Restoration Services, Inc. (RSI), Oak Ridge, Tennessee (United States)

    2012-07-01

    The 1995 Environmental Protection Agency (EPA) and U.S. Department of Energy (DOE) joint 'Policy on Decommissioning of Department of Energy Facilities Under CERCLA was developed so that decommissioning could occur in a manner that ensures protection of worker and public health and the environment, that is consistent with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), that provides for stakeholder involvement, and that achieves risk reduction without unnecessary delay'. The source of the 'unnecessary delays' the joint policy intended to avert could be attributed to numerous factors such as obtaining permits, conducting administrative activities, or implementing regulatory processes that could yield, among other things, differing preferred alternatives. Why, you might ask, more than fifteen years later, does DOE continue to struggle through CERCLA projects with unnecessary delays? From problem identification, to determination of nature and extent, to alternative analysis and ultimately remedy selection and implementation, reaching a compliant and effective clean-up end-point can be a process that seems to mimic geologic timescales. The source of these delays is often the failure to use all of the tools the CERCLA process offers. As one example, renewed commitment to follow the CERCLA process to address the regulatory reviews pursuant to the National Historic Preservation Act (NHPA) is called for. Project managers implementing CERCLA actions in any agency, not only DOE, do not need to be apprehensive about using the CERCLA process for NHPA review but should welcome it. It is critical that methods are used that address substantive NHPA requirements clearly and consistently, and that they are shared and communicated as frequently as needed to interested and questioning stakeholders. (author)

  17. Det europæiske Model Company Law Act Project

    DEFF Research Database (Denmark)

    Andersen, Paul Krüger; Baums, Theodor

    2008-01-01

    På initiativ af forfatterne til det følgende blev der i 2007 dannet en europæisk gruppe af fremtrædende selskabsretseksperter med henblik på at udforme en »European Model Company Law Act« (EMCLA). Gruppen holdt sit første møde i Århus i september 2007.  ...

  18. 78 FR 35961 - Pilot Project for Tribal Jurisdiction Over Crimes of Domestic Violence

    Science.gov (United States)

    2013-06-14

    ...This notice proposes procedures for an Indian tribe to request designation as a participating tribe under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, pursuant to the voluntary pilot project described in section 908(b)(2) of the Violence Against Women Reauthorization Act of 2013 (``the Pilot Project''), and also proposes procedures for the Attorney General to act on such a request. This notice also invites public comment on the proposed procedures and solicits preliminary expressions of interest from tribes that may wish to participate in the Pilot Project.

  19. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  20. Lifts of projective congruence groups, II

    DEFF Research Database (Denmark)

    Kiming, Ian

    2014-01-01

    We continue and complete our previous paper ``Lifts of projective congruence groups'' concerning the question of whether there exist noncongruence subgroups of  that are projectively equivalent to one of the groups  or . A complete answer to this question is obtained: In case of  such noncongruence...

  1. Legislation in Hungary. Implementation of the Act on Atomic Energy

    International Nuclear Information System (INIS)

    Szonyi, Z.

    1999-01-01

    The presentation gives a short overview of the history and development of the Hungarian nuclear regulatory regime. The new Act on Atomic Energy is a consequence of the significant internal and international changes. The main characteristic of the Act represent the new expectations and challenges of the nuclear community and the solid and reliable Hungarian legal solutions. The competences, duties and responsibilities of Hungarian Atomic Energy Authority and of the joining other relevant ministries and the complete regulatory framework guarantee the enforcement of the requirements set by the Act.(author)

  2. UMTRA Surface Project management action process document. Final report: Revision 1

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project

  3. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  4. The Norsk Hydro implementation of mechanical completion for the Oseberg project

    International Nuclear Information System (INIS)

    Holter, H.G.

    1990-01-01

    The conference paper deals with the implementation of mechanical completion of the Oseberg oil and natural gas field on the Norwegian continental shelf. Topics being discussed are concerned with the philosophy/system, organization/responsibility, vendor packages, and module sites/hook-up. The obtained experience from the Oseberg phase 1 being implemented in phase 2 are discussed. 4 figs

  5. Evolution of completion tools gravel pack systems for deep water

    Energy Technology Data Exchange (ETDEWEB)

    Pineda, Francisco [BJ Services Company, Houston, TX (United States); Vilela, Alvaro; Montanha, Roberto; Hightower, Chad; Acosta, Marco; Farias, Rodrigo [BJ Services do Brasil Ltda., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Conventional gravel pack or frac pack completions typically require the use of wash pipe to act as a conduit for fluid returns as well as to carry a shifting mechanism to open or close a return port. Using properly sized wash pipe can enhance the placement of the gravel across the entire annular space and the formation. It can also be used in conjunction with a shifting mechanism and a sliding sleeve to force the fluid returns to pass through the bottom of the screen. It can allow a wash-down capability while running the assembly into an open hole. In specialty systems, it can even act as a pumping conduit for post-gravel pack stimulation. However, the use of wash pipe, especially in long horizontal wells, means the loss of valuable rig time due to make up and break out of the wash pipe, or recovery if the wash pipe is stuck. Economic considerations, along with completion efficiencies, are especially important on deep water completions. Not using wash pipe reduces rig time, generating significant cost savings, and also eliminates the risk of a fishing operation. This paper reviews conventional wash pipe applications and describes new systems that accomplish the same goal with a minimum amount of wash pipe or no wash pipe at all. (author)

  6. Advanced energy projects: FY 1987 research summaries

    International Nuclear Information System (INIS)

    1987-09-01

    This report contains brief summaries of all projects active in the Division of Advanced Energy Projects during Fiscal Year 1987 (October 1, 1986-September 30, 1987). The intent of this compilation is to provide a convenient means for quickly acquainting an interested reader with the program in Advanced Energy Projects. More detailed information on research activities in a particular project may be obtained by contacting directly the principal investigator. Some projects will have reached the end of their contract periods by the time this book appears, and will, therefore, no longer be active. Those cases in which work was completed in FY '87 are indicated by the footnote: Project completed. The annual funding level of each project is shown

  7. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  8. 75 FR 14190 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Joint Venture To...

    Science.gov (United States)

    2010-03-24

    ... Production Act of 1993--Joint Venture To Perform Project Entitled Robotic Rehabilitation of Aging Water... Cooperative Research and Production Act of 1993, 15 U.S.C. 4301 et sect. (``the Act''), Joint [[Page 14191

  9. Title VI in '76: Review of Projects Funded Under P.L. 91-230 Title VI-B, Education of the Handicapped Act, as Amended by P.L. 93-380 and P.L. 94-142. Fiscal Year 1976.

    Science.gov (United States)

    Florida State Dept. of Education, Tallahassee.

    Summarized are 89 projects which served exceptional students in all 67 Florida school districts and were funded during the 1975-76 school year under P.L. 91-230 Title VI B (Education of the Handicapped Act) as ammended by P.L. 93-380 and P.L. 94-142. Projects are divided into the following major areas; Florida Learning Resources System,…

  10. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  11. Capital planning for operating theatres based on projecting future theatre requirements.

    Science.gov (United States)

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  12. Legal financial institutions in the Water Law Act

    Directory of Open Access Journals (Sweden)

    Andrzej Borodo

    2015-12-01

    Full Text Available Some fees and payments are connected with obligatory participation in the cost of public projects and public investment. In the framework of the Water Law Act there are diverse public payments and fees. In this law there is the drainage fee and the investment fee. There are also contributions and other payments to the water companies. In the regulations of the Water Law Act there are also legal financial solutions for sharing the public costs, the use of budget subsidies, fixing and allocation of public expenditure.

  13. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  14. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  15. Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk

    Science.gov (United States)

    David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke

    2011-01-01

    Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...

  16. The Genetic Privacy Act and commentary

    Energy Technology Data Exchange (ETDEWEB)

    Annas, G.J.; Glantz, L.H.; Roche, P.A.

    1995-02-28

    The Genetic Privacy Act is a proposal for federal legislation. The Act is based on the premise that genetic information is different from other types of personal information in ways that require special protection. The DNA molecule holds an extensive amount of currently indecipherable information. The major goal of the Human Genome Project is to decipher this code so that the information it contains is accessible. The privacy question is, accessible to whom? The highly personal nature of the information contained in DNA can be illustrated by thinking of DNA as containing an individual`s {open_quotes}future diary.{close_quotes} A diary is perhaps the most personal and private document a person can create. It contains a person`s innermost thoughts and perceptions, and is usually hidden and locked to assure its secrecy. Diaries describe the past. The information in one`s genetic code can be thought of as a coded probabilistic future diary because it describes an important part of a unique and personal future. This document presents an introduction to the proposal for federal legislation `the Genetic Privacy Act`; a copy of the proposed act; and comment.

  17. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  18. Student Engagement and Completion in Precalculus Precalculus Mega Section: Efficiently Assisting Student Engagement and Completion with Communications and Information Technology

    Science.gov (United States)

    Brusi, Rima; Portnoy, Arturo; Toro, Nilsa

    2013-01-01

    The Precalculus Mega Section project was developed with the main purpose of improving the overall performance of the student body in Precalculus, an important gatekeeper course that affects student engagement and completion, with typical drop/failure rates of over 50 percent. Strategies such as integration of technology and additional practice…

  19. Managing water, fish and power : trends in environmental regulation of hydropower projects

    Energy Technology Data Exchange (ETDEWEB)

    Bursey, D.; McLean, J.; Longe, R. [Bull, Housser and Tupper LLP, Vancouver, BC (Canada)

    2009-07-01

    Recent trends in federal legislation related to the environmental impacts of hydroelectric power projects were reviewed. The study focused on a discussion of recent and proposed amendments to the Species at Risk Act, the Fisheries Act, and the Navigable Waters Protection Act. Challenges associated with risk management, the public perception of risk, and the communication of decisions related to the management and protection of aquatic ecosystems were discussed. The Brilliant Expansion Power Project (BRX) examined the interactions with white sturgeon on the Kootenay River in British Columbia (BC). A monitoring program was conducted during the project's construction in order to reduce the risk to sturgeon from blasting. A habitat enhancement feature was also constructed. It was concluded that the mitigation strategies used during the BRX project provide a useful example of innovation and adaptive management. 19 refs.

  20. EGP contribution to Mochovce completion, safety enhancement and operation

    International Nuclear Information System (INIS)

    Letko, A.; Matula, P.

    2000-01-01

    The Re-Evaluation Programme of Mochovce NPP was created in 1995 as an integral part of the completion of the Unit 1 and Unit 2. This program analyzed the general fulfillment of the principle of nuclear safety in the NPP Mochovce project. The analysis has required new corrections of the project, so that the project met the higher safety requirements when starting production. 87 safety measures represent the 'Program'. The basis for their creation were the international missions from 1992 to 1995 which defined. The final safety aim was represented by 'The Technical Specification of the Safety Measures' supported by The Nuclear Power Plant Research Institute and recommended by The Nuclear Regulatory Authority of the Slovak Republic. The technical specification served as a qualified base for the next steps in the pre-project, project and realization stages. (author)

  1. Energy source completion for geothermal district heating systems

    International Nuclear Information System (INIS)

    Popovski, Kiril

    2000-01-01

    Geothermal district heating systems differs from the others mainly in the part of energy source completion and its connection to the heat distribution systems rather known problem. Even rather known problematic in the countries where geothermal energy is in wide application, new appearances of mistakes are always present due to the fact that necessary literature is difficult to be found. Essentials of the geothermal well completion and connection of geothermal source to the district heating distribution system are summarized in the paper and several examples of geothermal projects in flow are presented. (Author)

  2. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  3. 75 FR 65007 - Privacy Act of 1974; System of Records

    Science.gov (United States)

    2010-10-21

    ... Officer, P.O. Box 2218, Waldorf, MD 20604-2218. Individuals should complete AFOSI's Certification of... of Information/Privacy Act Officer, P.O. Box 2218, Waldorf, MD 20604-2218. Individuals should...

  4. What Are Reasons for the Large Gender Differences in the Lethality of Suicidal Acts? An Epidemiological Analysis in Four European Countries.

    Science.gov (United States)

    Mergl, Roland; Koburger, Nicole; Heinrichs, Katherina; Székely, András; Tóth, Mónika Ditta; Coyne, James; Quintão, Sónia; Arensman, Ella; Coffey, Claire; Maxwell, Margaret; Värnik, Airi; van Audenhove, Chantal; McDaid, David; Sarchiapone, Marco; Schmidtke, Armin; Genz, Axel; Gusmão, Ricardo; Hegerl, Ulrich

    2015-01-01

    In Europe, men have lower rates of attempted suicide compared to women and at the same time a higher rate of completed suicides, indicating major gender differences in lethality of suicidal behaviour. The aim of this study was to analyse the extent to which these gender differences in lethality can be explained by factors such as choice of more lethal methods or lethality differences within the same suicide method or age. In addition, we explored gender differences in the intentionality of suicide attempts. Methods. Design: Epidemiological study using a combination of self-report and official data. Setting: Mental health care services in four European countries: Germany, Hungary, Ireland, and Portugal. Data basis: Completed suicides derived from official statistics for each country (767 acts, 74.4% male) and assessed suicide attempts excluding habitual intentional self-harm (8,175 acts, 43.2% male). Main Outcome Measures and Data Analysis. We collected data on suicidal acts in eight regions of four European countries participating in the EU-funded "OSPI-Europe"-project (www.ospi-europe.com). We calculated method-specific lethality using the number of completed suicides per method * 100 / (number of completed suicides per method + number of attempted suicides per method). We tested gender differences in the distribution of suicidal acts for significance by using the χ2-test for two-by-two tables. We assessed the effect sizes with phi coefficients (φ). We identified predictors of lethality with a binary logistic regression analysis. Poisson regression analysis examined the contribution of choice of methods and method-specific lethality to gender differences in the lethality of suicidal acts. Suicidal acts (fatal and non-fatal) were 3.4 times more lethal in men than in women (lethality 13.91% (regarding 4106 suicidal acts) versus 4.05% (regarding 4836 suicidal acts)), the difference being significant for the methods hanging, jumping, moving objects, sharp objects

  5. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  6. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  7. The third phase of the OECD/NEA TDB project: TDB III

    International Nuclear Information System (INIS)

    Mompean, F.J.; Illemassene, M.; Perrone, J.

    2005-01-01

    In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)

  8. Critical Care Implications of the Affordable Care Act.

    Science.gov (United States)

    Dogra, Anjali P; Dorman, Todd

    2016-03-01

    To provide an overview of key elements of the Affordable Care Act. To evaluate ways in which the Affordable Care Act will likely impact the practice of critical care medicine. To describe strategies that may help health systems and providers effectively adapt to changes brought about by the Affordable Care Act. Data sources for this concise review include search results from the PubMed and Embase databases, as well as sources relevant to public policy such as the text of the Patient Protection and Affordable Care Act and reports of the Congressional Budget Office. As all of the Affordable Care Act's provisions will not be fully implemented until 2019, we also drew upon cost, population, and utilization projections, as well as the experience of existing state-based healthcare reforms. The Affordable Care Act represents the furthest reaching regulatory changes in the U.S. healthcare system since the 1965 Medicare and Medicaid provisions of the Social Security Act. The Affordable Care Act aims to expand health insurance coverage to millions of Americans and place an emphasis on quality and cost-effectiveness of care. From models which link pay and performance to those which center on episodic care, the Affordable Care Act outlines sweeping changes to health systems, reimbursement structures, and the delivery of critical care. Staffing models that include daily rounding by an intensivist, palliative care integration, and expansion of the role of telemedicine in areas where intensivists are inaccessible are potential strategies that may improve quality and profitability of ICU care in the post-Affordable Care Act era.

  9. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  10. Factorization of cp-rank-3 completely positive matrices

    Czech Academy of Sciences Publication Activity Database

    Brandts, J.; Křížek, Michal

    2016-01-01

    Roč. 66, č. 3 (2016), s. 955-970 ISSN 0011-4642 R&D Projects: GA ČR GA14-02067S Institutional support: RVO:67985840 Keywords : completely positive matrix * cp-rank * factorization Subject RIV: BA - General Mathematics Impact factor: 0.364, year: 2016 http://hdl.handle.net/10338.dmlcz/145882

  11. The Environmental Restoration Project Style and Resources Guide; TOPICAL

    International Nuclear Information System (INIS)

    C. J. Forbes

    1999-01-01

    This Style Guide identifies the wide and flexible array of support services/resources that are available to ER project and functional organizations through Publication and Graphic Services. The Style Guide describes how ER Project groups can complete virtually any kind of information project without any costs charged to their budgets. Another purpose of the Style Guide is to provide ER project and functional organizations with the ability to determine when to request capabilities/resources for information projects, and when to complete such projects on their own

  12. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study.

    Science.gov (United States)

    Shapiro, Johanna; Nguyen, Vincent P; Mourra, Sarah; Boker, John R; Ross, Marianne; Thai, Trung M; Leonard, Robert J

    2009-11-03

    The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project). Differences between groups on individual exams after both the first and second creative project were nonsignificant. For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  13. The Complexities of Digital Storytelling: Factors Affecting Performance, Production, and Project Completion

    Science.gov (United States)

    Gobel, Peter; Kano, Makimi

    2016-01-01

    Digital storytelling projects provide a variety of opportunities for learning in the language classroom, but along with these opportunities come a number of challenges for both pedagogy and technology. This presentation describes an ongoing multi-method study into factors involved in task-based learning using digital storytelling. Using intact…

  14. 25 CFR 700.33 - Act (The Act).

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Act (The Act). 700.33 Section 700.33 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.33 Act (The Act). (a) The Act. The Act is Pub. L. 93-531, (88 Stat...

  15. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  16. Completion time reduction in instantly decodable network coding through decoding delay control

    KAUST Repository

    Douik, Ahmed S.; Sorour, Sameh; Alouini, Mohamed-Slim; Al-Naffouri, Tareq Y.

    2014-01-01

    For several years, the completion time and the decoding delay problems in Instantly Decodable Network Coding (IDNC) were considered separately and were thought to completely act against each other. Recently, some works aimed to balance the effects of these two important IDNC metrics but none of them studied a further optimization of one by controlling the other. In this paper, we study the effect of controlling the decoding delay to reduce the completion time below its currently best known solution. We first derive the decoding-delay-dependent expressions of the users' and their overall completion times. Although using such expressions to find the optimal overall completion time is NP-hard, we use a heuristic that minimizes the probability of increasing the maximum of these decoding-delay-dependent completion time expressions after each transmission through a layered control of their decoding delays. Simulation results show that this new algorithm achieves both a lower mean completion time and mean decoding delay compared to the best known heuristic for completion time reduction. The gap in performance becomes significant for harsh erasure scenarios.

  17. Completion time reduction in instantly decodable network coding through decoding delay control

    KAUST Repository

    Douik, Ahmed S.

    2014-12-01

    For several years, the completion time and the decoding delay problems in Instantly Decodable Network Coding (IDNC) were considered separately and were thought to completely act against each other. Recently, some works aimed to balance the effects of these two important IDNC metrics but none of them studied a further optimization of one by controlling the other. In this paper, we study the effect of controlling the decoding delay to reduce the completion time below its currently best known solution. We first derive the decoding-delay-dependent expressions of the users\\' and their overall completion times. Although using such expressions to find the optimal overall completion time is NP-hard, we use a heuristic that minimizes the probability of increasing the maximum of these decoding-delay-dependent completion time expressions after each transmission through a layered control of their decoding delays. Simulation results show that this new algorithm achieves both a lower mean completion time and mean decoding delay compared to the best known heuristic for completion time reduction. The gap in performance becomes significant for harsh erasure scenarios.

  18. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  19. Nonassociative Substructural Logics and Their Semilinear Extensions: Axiomatization and Completeness Properties

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Horčík, Rostislav; Noguera, Carles

    2013-01-01

    Roč. 6, č. 3 (2013), s. 394-423 ISSN 1755-0203 R&D Projects: GA ČR GBP202/12/G061 Grant - others:ESF/Austrian Science Foundation project(AT) I143-G15 Institutional support: RVO:67985807 ; RVO:67985556 Keywords : nonassociative full Lambek calculus * deduction theorem * standard completeness Subject RIV: BA - General Mathematics Impact factor: 0.525, year: 2013

  20. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  1. WP1 – Final project report

    NARCIS (Netherlands)

    Drachsler, Hendrik; Scheffel, Maren; Orrego, Carola; Stieger, Lina; Hartkopf, Kathleen; Henn, Patrick; Hynes, Helen; Przibilla, Monika; Geiger, Uschi; Schroeder, Hanna; Sopka, Sasa

    2015-01-01

    This report contains the complete project reporting of the PATIENT project from October 2012 until end of March 2015. It provides a summary of all project activities and achievements that are based on the previous WP deliverables such as the project progress reports from WP1 (D1.01) and the quality

  2. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study

    Directory of Open Access Journals (Sweden)

    Thai Trung M

    2009-11-01

    Full Text Available Abstract Background The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Methods Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Results Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project. Differences between groups on individual exams after both the first and second creative project were nonsignificant. Conclusion For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  3. The complete guide to DAZ Studio 4

    CERN Document Server

    Ciccone, Paolo

    2013-01-01

    The book builds up a complete project from scratch and demonstrates the power of DAZ to create life-like characters. The book is replete with detailed examples and instructions on creating a tailor-made marvel out of scratch.This book can be used by anybody who has DAZ Studio 4, regardless of their level of familiarity with the program or the concepts of 3D art.

  4. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  5. Completing the results of the 2013 Boston marathon.

    Directory of Open Access Journals (Sweden)

    Dorit Hammerling

    Full Text Available The 2013 Boston marathon was disrupted by two bombs placed near the finish line. The bombs resulted in three deaths and several hundred injuries. Of lesser concern, in the immediate aftermath, was the fact that nearly 6,000 runners failed to finish the race. We were approached by the marathon's organizers, the Boston Athletic Association (BAA, and asked to recommend a procedure for projecting finish times for the runners who could not complete the race. With assistance from the BAA, we created a dataset consisting of all the runners in the 2013 race who reached the halfway point but failed to finish, as well as all runners from the 2010 and 2011 Boston marathons. The data consist of split times from each of the 5 km sections of the course, as well as the final 2.2 km (from 40 km to the finish. The statistical objective is to predict the missing split times for the runners who failed to finish in 2013. We set this problem in the context of the matrix completion problem, examples of which include imputing missing data in DNA microarray experiments, and the Netflix prize problem. We propose five prediction methods and create a validation dataset to measure their performance by mean squared error and other measures. The best method used local regression based on a K-nearest-neighbors algorithm (KNN method, though several other methods produced results of similar quality. We show how the results were used to create projected times for the 2013 runners and discuss potential for future application of the same methodology. We present the whole project as an example of reproducible research, in that we are able to make the full data and all the algorithms we have used publicly available, which may facilitate future research extending the methods or proposing completely different approaches.

  6. Completing the results of the 2013 Boston marathon.

    Science.gov (United States)

    Hammerling, Dorit; Cefalu, Matthew; Cisewski, Jessi; Dominici, Francesca; Parmigiani, Giovanni; Paulson, Charles; Smith, Richard L

    2014-01-01

    The 2013 Boston marathon was disrupted by two bombs placed near the finish line. The bombs resulted in three deaths and several hundred injuries. Of lesser concern, in the immediate aftermath, was the fact that nearly 6,000 runners failed to finish the race. We were approached by the marathon's organizers, the Boston Athletic Association (BAA), and asked to recommend a procedure for projecting finish times for the runners who could not complete the race. With assistance from the BAA, we created a dataset consisting of all the runners in the 2013 race who reached the halfway point but failed to finish, as well as all runners from the 2010 and 2011 Boston marathons. The data consist of split times from each of the 5 km sections of the course, as well as the final 2.2 km (from 40 km to the finish). The statistical objective is to predict the missing split times for the runners who failed to finish in 2013. We set this problem in the context of the matrix completion problem, examples of which include imputing missing data in DNA microarray experiments, and the Netflix prize problem. We propose five prediction methods and create a validation dataset to measure their performance by mean squared error and other measures. The best method used local regression based on a K-nearest-neighbors algorithm (KNN method), though several other methods produced results of similar quality. We show how the results were used to create projected times for the 2013 runners and discuss potential for future application of the same methodology. We present the whole project as an example of reproducible research, in that we are able to make the full data and all the algorithms we have used publicly available, which may facilitate future research extending the methods or proposing completely different approaches.

  7. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  8. Optical packet networks - conclusions from the IST DAVID project

    DEFF Research Database (Denmark)

    Dittmann, Lars

    2004-01-01

    This work outlines the result from the European research project DAVID working with optical packet switch solutions for both WAN and MAN. The project started July 2000 and has been completed successfully by the end of 2003.......This work outlines the result from the European research project DAVID working with optical packet switch solutions for both WAN and MAN. The project started July 2000 and has been completed successfully by the end of 2003....

  9. Gravel packing dual zones in one trip reduces offshore completion time

    International Nuclear Information System (INIS)

    Brannon, D.H.; Harrison, D.T.; van Sickle, E.W.

    1991-01-01

    A single trip, dual-zone gravel pack system was used to successfully gravel pack two wells on Green Canyon platform 52 A in the Gulf of Mexico. An average 56 hours was saved on each well, representing reductions of about 25% in completion time and 26% in completion cost per well. Time-sensitive costs had the largest impact on Green Canyon 52 A final well completion cost; therefore, new technology or more efficient operations were required to minimize completion time. One way to enhance project economics was to gravel pack two separate zones in one trip. In this paper, four objectives are addressed during development of a single trip tool to gravel pack the stacked zones of the Marquette project. These were time and cost reduction, removal of loss circulation material (LCM) prior to gravel packing, zone isolation during gravel packing and use of conventional gravel placement techniques. The design requirement that all LCM (salt and/or viscous polymer pills), perforation debris and formation sand be removed from the wellbore prior to gravel packing was accomplished by incorporating a washdown feature that allows circulation at the bottom of the gravel pack assembly prior to landing in the sump packer

  10. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  11. Bone scintigraphy during therapy with cytostatically acting drugs

    International Nuclear Information System (INIS)

    Schmidt, U.; Pries, H.H.; Joseph, K.; Mahlstedt, J.; Marburg Univ.

    1976-01-01

    Case reports show up, that bone scintigraphy during therapy of metastasing cancer of mamma or prostata with cytostatically acting drugs may reveal 'pseudonormal' results. False negative diagnosis can be excluded only by carefully regarding drug history. Gamma-camera with wholebody scan device for scintigraphy in two projections simplifies safe evaluation significantly. (orig.) [de

  12. Playing with the team: The Development of Communities of Practice in a Digital Storytelling Project

    Directory of Open Access Journals (Sweden)

    Peter John Westman

    2012-12-01

    Full Text Available Since its emergence in the early 1990's, digital storytelling has been variouslyidentified as a new media practice, a consumer and community-led movement,and a textual system. However, given its relative nascent status, there remainsthe need for further academic research focusing on the different forms it hasassumed. During the spring/summer of 2011, I conducted an examination ofTaking the Field (TTF, a digital storytelling project that aims to celebrategrassroots cricket in the UK through the construction of stories by village andcounty-level clubs. In contrast to most previous projects that aim to have theparticipants “speak” by constructing their own stories, TTF stories are researchedand constructed by project staff with the assistance of the clubs.My research centers on the experiences of two clubs in the project, Blaina CC andSpondon CC, through interviews and elicitation techniques with club andcommunity members using the completed stories and the artifacts used in theirconstruction. Through the theoretical framework of Gell's anthropology of art, Iconsider how digital stories act as objects that mediate social agency during theircreation and how the structure of this type of project contributes to the formationof communities of practice in the 'performance' of collective identity.

  13. 75 FR 52689 - Multifamily Housing Reform and Affordability Act: Projects Eligible for a Restructuring Plan...

    Science.gov (United States)

    2010-08-27

    ... HUD-held financing. Essentially, these eligible projects are: (1) Those with rents that on average... CFR parts 401 and 402 (71 FR 2120). The regulatory definition of an eligible project was originally... the 1998 interim rule, the definition of ``eligible project'' read: Eligible project means a project...

  14. A Monte Carlo approach to combating delayed completion of ...

    African Journals Online (AJOL)

    The objective of this paper is to unveil the relevance of Monte Carlo critical path analysis in resolving problem of delays in scheduled completion of development projects. Commencing with deterministic network scheduling, Monte Carlo critical path analysis was advanced by assigning probability distributions to task times.

  15. Accident Investigation on a Large Construction Project: An Ethnographic Case Study

    OpenAIRE

    Oswald, David; Smith, Simon; Sherratt, Fred

    2015-01-01

    Unsafe acts are believed to account for approximately 80 to 90 percent of accidents. This paper will investigate this issue through exploring the reasoning behind the unsafe acts that resulted in a minor accident on a large construction project (+$1B) in the UK. The study described here, part of a wider PhD project, was undertaken using an ethnographic approach. Participant observation enabled the researcher to be involved in the whole accident investigation process including witness statemen...

  16. Parkinson's Law and Its Implications for Project Management

    OpenAIRE

    Genaro J. Gutierrez; Panagiotis Kouvelis

    1991-01-01

    Critical path models concerning project management (i.e. PERT/CPM) fail to account for work force behavioral effects on the expected project completion time. In this paper, we provide a modelling framework for project management activities, that ultimately accounts for expected worker behavior under Parkinson's Law. A stochastic activity completion time model is used to formally state Parkinson's Law. The developed model helps to examine the effects of information release policies on subcontr...

  17. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  18. Proportionality in the New German Insurance Contract Act 2008

    NARCIS (Netherlands)

    H. Heiss (Helmut)

    2013-01-01

    markdownabstract__Abstract__ In 2008, the German legislature enacted a completely revised Insurance Contract Act, in which a new rule of proportionality replaced the former all-or-nothing principle for questions of liability. This article outlines the reasons for this shift and the impact of the

  19. Engaging Clinical Nurses in Quality Improvement Projects.

    Science.gov (United States)

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  20. 18 CFR Appendix A to Part 380 - Minimum Filing Requirements for Environmental Reports Under the Natural Gas Act

    Science.gov (United States)

    2010-04-01

    ... Requirements for Environmental Reports Under the Natural Gas Act A Appendix A to Part 380 Conservation of Power... Filing Requirements for Environmental Reports Under the Natural Gas Act Environmental Reports Under the Natural Gas Act. Resource Report 1—General Project Description 1. Provide a detailed description and...

  1. The Endangered Species Act and a Deeper Look at Extinction.

    Science.gov (United States)

    Borowski, John F.

    1992-01-01

    Discusses the importance of saving species and dispels myths surrounding the endangered species act as background to three student activities that include a round table debate, writing to congresspeople, and a research project suggestion. Lists reference materials for endangered species. (MCO)

  2. Improving Completion Rates in Adult Education through Social Responsibility

    Science.gov (United States)

    Wahlgren, Bjarne; Mariager-Anderson, Kristina

    2017-01-01

    Dropout is a serious problem within education. This article reports on an intervention project, titled "New Roles for the Teacher--Increased Completion Rates Through Social Responsibility," which sought to reduce nonattendance and drop-out rates in the Danish adult educational system by improving teachers' competences. This goal was…

  3. ¡VAMOS! (Viable Alternative Mine Operating System) - a 'Horizon 2020' project

    Science.gov (United States)

    Sword, Cameron; Bodo, Balazs; Kapusniak, Stef; Bosman, Frank; Rainbird, Jenny; Silva, Eduardo

    2017-04-01

    The 42-month ¡VAMOS! project (Viable Alternative Mine Operating System, Grant Agreement 642477, www.vamos-project.eu), funded by the EC H2020 Programme, will enable access to high-grade EU reserves of mineral ore-bodies by developing an innovative clean and low visibility mining technique. The project will demonstrate the technological and economic viability of the underwater extraction of metallic mineral deposits which are currently technologically, economically, and environmentally unobtainable. In doing so, ¡VAMOS! hopes to encourage investment in abandoned open-pit mines and prospective mines, helping to put the EU back on a level playing field with the rest of the world in terms of access to strategically important minerals. The ¡VAMOS! concept is defined by a remotely-operated underwater mining vehicle, adapted and improved from existing subsea mining technology. Operating in tandem with an HROV, the mining vehicle will connect to a flexible riser through which slurried mined material will be pumped from the mudline to onshore dewatering facilities via a floating mobile deployment-module, on which will be fitted a bypass system linked to an LIBS, allowing real-time grade-control. Analysis of European and national regulation and stakeholder assessments found there is significant support for developing the technology among local communities and governments. An initial environmental assessment of the potential impact of the innovative mining operation concluded the project has a smaller environmental footprint than conventional mining operations: this is due to factors including the quieter operation and absence of blasting, zero water-table flux, and the higher stripping ratio enabled by higher fluid pressure acting on the sidewalls of the mine. The prototypes are currently in their construction phase following a final design freeze in October 2016. Work is now underway on the foresight visioning, economic evaluation and policy guidelines for the

  4. National register of research projects

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    This Register is intended to serve as a source of information on research which is being conducted in all fields (both natural and human sciences) in the Republic of South Africa. New research projects commenced during 1983 or 1984, and significantly changed research projects, as well as project that were completed or terminated during this period, on which information was received by the compilers before December 1984, are included, with the exception of confidential projects.

  5. What Are Reasons for the Large Gender Differences in the Lethality of Suicidal Acts? An Epidemiological Analysis in Four European Countries.

    Directory of Open Access Journals (Sweden)

    Roland Mergl

    Full Text Available In Europe, men have lower rates of attempted suicide compared to women and at the same time a higher rate of completed suicides, indicating major gender differences in lethality of suicidal behaviour. The aim of this study was to analyse the extent to which these gender differences in lethality can be explained by factors such as choice of more lethal methods or lethality differences within the same suicide method or age. In addition, we explored gender differences in the intentionality of suicide attempts.Methods. Design: Epidemiological study using a combination of self-report and official data. Setting: Mental health care services in four European countries: Germany, Hungary, Ireland, and Portugal. Data basis: Completed suicides derived from official statistics for each country (767 acts, 74.4% male and assessed suicide attempts excluding habitual intentional self-harm (8,175 acts, 43.2% male. Main Outcome Measures and Data Analysis. We collected data on suicidal acts in eight regions of four European countries participating in the EU-funded "OSPI-Europe"-project (www.ospi-europe.com. We calculated method-specific lethality using the number of completed suicides per method * 100 / (number of completed suicides per method + number of attempted suicides per method. We tested gender differences in the distribution of suicidal acts for significance by using the χ2-test for two-by-two tables. We assessed the effect sizes with phi coefficients (φ. We identified predictors of lethality with a binary logistic regression analysis. Poisson regression analysis examined the contribution of choice of methods and method-specific lethality to gender differences in the lethality of suicidal acts.Suicidal acts (fatal and non-fatal were 3.4 times more lethal in men than in women (lethality 13.91% (regarding 4106 suicidal acts versus 4.05% (regarding 4836 suicidal acts, the difference being significant for the methods hanging, jumping, moving objects, sharp

  6. Reduction of artefacts due to missing projections using OSEM

    International Nuclear Information System (INIS)

    Hutton, B.F.; Kyme, A.; Choong, K.

    2002-01-01

    Full text: It is well recognised that missing or corrupted projections can result in artefacts. This occasionally occurs due to errors in data transfer from acquisition memory to disk. A possible approach for reducing these artefacts was investigated, Using ordered subsets expectation maximization (OSEM) the iterative reconstruction proceeds by progressively including additional projections until a single iteration is complete. Clinically useful results can be obtained using a small subset size in a single iteration. Stopping prior to the complete iteration so as to avoid inclusion of missing or corrupted data should provide a 'partial' reconstruction with minimal artefacts. To test this hypothesis projections were selectively removed from a complete data set (2, 4, 8, 12 adjacent projections) and reconstructions were performed using both filtered back projection (FBP) and OSEM. To maintain a constant number of sub-iterations in OSEM an equal number of duplicate projections were substituted for the missing projections. Both 180 and 360 degrees reconstructions with missing data were compared with reconstruction for the complete data using sum of absolute differences. Results indicate that missing data causes artefacts for both FBP and OSEM however the severity of artefacts is significantly reduced using OSEM. The effect of missing data is generally greater for 180 degrees acquisition. OSEM is recommended for minimising reconstruction artefacts due to missing projections. Copyright (2002) The Australian and New Zealand Society of Nuclear Medicine Inc

  7. Completion of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Zavodsky, Petr

    2012-01-01

    The article consists of the following sections: Introduction - current situation in the nuclear sector; (1) Where is Europe heading? (2) What options does the Czech Republic's have available? (3) Nuclear is the best solution; (4) What nuclear projects is CEZ Group preparing? (A - Contractor selection; B - Environmental impact assessment and licensing process; C- Associated investments); (5) Why at Temelin? (6) Safety and legislative requirements; (7) Which technologies? (8) Potential contractors; (8.1) AP1000; (8.2.) EPR; (8.3) MIR1200; (9) Completion of the NPP will contribute to the country's economic growth and competitiveness; (10) Contribution to environmental protection; and (11) The effects of the Temelin plant completion on the environment are assessed with the EIA procedure. (P.A.)

  8. 76 FR 72449 - Notice of Buy American Waiver Under the American Recovery and Reinvestment Act of 2009

    Science.gov (United States)

    2011-11-23

    ... manufactured goods used in and incorporated into a project funded through the Academic Research Infrastructure... iron, steel, and manufactured goods used in and incorporated into a project funded through the Academic... Recovery Act projects funded by the Academic Research Infrastructure--Recovery and Reinvestment Program...

  9. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Vance, R.F. [West Valley Nuclear Services Co., Inc., NY (United States)

    1995-02-01

    The West Valley Demonstration Project was established by Public Law 96-368, the {open_quotes}West Valley Demonstration Project Act, {close_quotes} on October 1, l980. Under this act, Congress directed the Department of Energy to carry out a high level radioactive waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The purpose of this project is to demonstrate solidification techniques which can be used for preparing high level radioactive waste for disposal. In addition to developing this technology, the West Valley Demonstration Project Act directs the Department of Energy to: (1) develop containers suitable for permanent disposal of the high level waste; (2) transport the solidified high level waste to a Federal repository; (3) dispose of low level and transuranic waste produced under the project; and (4) decontaminate and decommission the facilities and materials associated with project activities and the storage tanks originally used to store the liquid high level radioactive waste. The process of vitrification will be used to solidify the high level radioactive liquid wastes into borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems which are used in the vitrification process.

  10. Social impact assessment in energy projects

    International Nuclear Information System (INIS)

    Koivujaervi, S.; Kantola, I.; Maekinen, P.

    1998-01-01

    The research report is based on literature and interviews on the social impact assessment (SIA) in energy projects in Finland, both before and after the EIA Act has been in force in Finland. The concept and content of SIA, the requirements set by the legislation, its relation with other environmental impacts, the assessment process and the used methods have been studied on the basis of the literature analysis. A total of 26 persons representing the coordination authorities, persons issuing statements, researchers, civil servants, consultants and project developers were interviewed for the research. The interviews were made by the University of Turku in the form of theme interviews, investigating the present status, practices and expectations of the SIA. The unestablished status was seen to be the problem in the SIA, which was reflected in the interviewers' varying views about the content of the SIA. Among the operators, the general character of the SIA criticism in the statements concerning the assessment programmes or reports was seen as a problem as well; the assessment of social impact has been considered to be insufficient, however, without any identification of the effects or how the effects should have been assessed. For the time preceding the EIA Act, the assessment of the social impact of hydraulic work, power plant and transmission line projects and the project of the fifth nuclear power plant have been studied. As to the power plant and transmission line projects after the validity of the EIA Act, all the 20 projects were gone through which had progressed during the spring 1998 at least to the assessment report stage. Of these projects, the assessment of the social impact of one transmission line and one power plant project was studied in detail. The report also studies the assessment of the social impact of the repository for nuclear waste on the basis of the experience gained in Finland and in other countries. On the basis of the literature study

  11. Complete genome sequence of the thermophilic sulfur-reducer Desulfurobacterium thermolithotrophum type strain (BSAT) from a deep-sea hydrothermal vent

    Energy Technology Data Exchange (ETDEWEB)

    Goker, Markus [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Daligault, Hajnalka E. [Los Alamos National Laboratory (LANL); Mwirichia, Romano [Jomo Kenyatta University of Agriculture and Technology, Nairobi, Kenya; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Deshpande, Shweta [U.S. Department of Energy, Joint Genome Institute; Pagani, Ioanna [U.S. Department of Energy, Joint Genome Institute; Tapia, Roxanne [Los Alamos National Laboratory (LANL); Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Liolios, Konstantinos [U.S. Department of Energy, Joint Genome Institute; Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Mavromatis, K [U.S. Department of Energy, Joint Genome Institute; Mikhailova, Natalia [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Chen, Amy [U.S. Department of Energy, Joint Genome Institute; Palaniappan, Krishna [U.S. Department of Energy, Joint Genome Institute; Han, Cliff [Los Alamos National Laboratory (LANL); Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Pan, Chongle [ORNL; Brambilla, Evelyne-Marie [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Rohde, Manfred [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Spring, Stefan [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Sikorski, Johannes [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Wirth, Reinhard [Universitat Regensburg, Regensburg, Germany; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Bristow, James [U.S. Department of Energy, Joint Genome Institute; Eisen, Jonathan [U.S. Department of Energy, Joint Genome Institute; Markowitz, Victor [U.S. Department of Energy, Joint Genome Institute; Hugenholtz, Philip [U.S. Department of Energy, Joint Genome Institute; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Klenk, Hans-Peter [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany

    2011-01-01

    Desulfurobacterium thermolithotrophum L'Haridon et al. 1998 is the type species of the ge- nus Desulfurobacterium which belongs to the family Desulfurobacteriaceae. The species is of interest because it represents the first thermophilic bacterium that can act as a primary pro- ducer in the temperature range of 45-75 C (optimum 70 C) and is incapable of growing un- der microaerophilic conditions. Strain BSAT preferentially synthesizes high-melting-point fatty acids (C18 and C20) which is hypothesized to be a strategy to ensure the functionality of the membrane at high growth temperatures. This is the second completed genome sequence of a member of the family Desulfurobacteriaceae and the first sequence from the genus Desulfu- robacterium. The 1,541,968 bp long genome harbors 1,543 protein-coding and 51 RNA genes and is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

  12. Enewetak radiological support project. Final report

    International Nuclear Information System (INIS)

    Friesen, B.

    1982-09-01

    From 1972 through 1980, the Department of Energy acted in an advisory role to the Defense Nuclear Agency during planning for and execution of the cleanup of Enewetak Atoll. The Nevada Operations Office of the Department of Energy was responsible for the radiological characterization of the atoll and for certification of radiological condition of each island upon completion of the project. In-situ measurements of gamma rays emitted by americium-241 were utilized along with wet chemistry separation of plutonium from soil samples to identify and delineate surface areas requiring removal of soil. Military forces removed over 100,000 cubic yards of soil from the surface of five islands and deposited this material in a crater remaining from the nuclear testing period. Subsurface soil was excavated and removed from several locations where measurements indicated the presence of radionuclides above predetermined criteria. The methodologies of data acquisition, analysis and interpretation are described and detailed results are provided in text, figures and microfiche. The final radiological condition of each of 43 islets is reported

  13. 75 FR 25294 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Joint Venture To...

    Science.gov (United States)

    2010-05-07

    ... Production Act of 1993--Joint Venture To Perform Project Entitled Versatile Onboard Traffic Embedded Roaming... Cooperative Research and Production Act of 1993, 15 U.S.C. 4301 et seq. (``the Act''), Joint Venture to..., Trilion Quality Systems, Plymouth Meeting, PA, has been added as a party to this venture. Also, Witten...

  14. Living with Smartphones: Does Completion Device Affect Survey Responses?

    Science.gov (United States)

    Lambert, Amber D.; Miller, Angie L.

    2015-01-01

    With the growing reliance on tablets and smartphones for internet access, understanding the effects of completion device on online survey responses becomes increasing important. This study uses data from the Strategic National Arts Alumni Project, a multi-institution online alumni survey designed to obtain knowledge of arts education, to explore…

  15. 78 FR 14554 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2013-03-06

    ... will focus on specific subpopulations at greatest risk for HIV infection. The target audiences will... Project Formative Research for the Development of CDC's Act Against AIDS Social Marketing Campaigns... period to develop various social marketing campaigns aimed at increasing HIV testing rates, increasing...

  16. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  17. Kotka ecopower IGCC-project, the attempt to transfer the biocycle project to Finland

    International Nuclear Information System (INIS)

    Salo, K.

    1998-01-01

    The Danish utilities Elsam and Elkraft planned to build a small (7 MW e ) IGCC-plant in Denmark, called Biocycle Project, based on the gasification and gas clean-up technology of Enviropower Inc. EU/THERMIE program committed to finance part of the investment. The project, however, was not feasible due to the difficulty of finding a suitable customer and sufficient amount of reasonably priced biomass. For this reason a new host and site was found for the Biocycle project. The new site was in Kotka, Finland, where Kotka Energy Ltd., the Energy Board of the City of Kotka acted as the main partner. The fuel of the IGCC project would have been sugar mill wood residue from Xyrofin Inc. During the feasibility investigation (project definition phase) Xyrofin Inc. made the decision to change the production process which eliminated the wood waste production. Without no-cost fuel and due to the low electricity price in Finland the small size IGCC power plant proved not to be feasible. (author)

  18. 78 FR 57808 - Rules and Regulations Under the Wool Products Labeling Act of 1939

    Science.gov (United States)

    2013-09-20

    ... noted a Cashmere and Camel Hair Manufacturers Institute study finding that, between 2004 and 2009, false... wool.\\26\\ The Joint Comment, however, reported the lack of consensus in the trade regarding ``how the S... with the Wool Act, to establish a complete defense to false advertising claims under the Lanham Act as...

  19. 76 FR 26714 - Privacy Act of 1974; System of Records

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF DEFENSE Department of the Army [Docket ID USA-2011-0010] Privacy Act of 1974; System... specialty, credit hours accumulated, examination and lesson course completion status, assignment history... history, student academic status, curricula, course description, scheduling, testing, academic, graduation...

  20. 78 FR 21401 - Notice of Inventory Completion: Central Washington University, Ellensburg, WA

    Science.gov (United States)

    2013-04-10

    ... Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the completion of an inventory of... administrative responsibilities under NAGPRA, 25 U.S.C. 3003(d)(3) and 43 CFR 10.11(d). The determinations in...-pams or Sokulks were Shahap-tam Indians and occupied both banks of the Columbia from a short distance...

  1. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  2. Self-Perceptions of Pre-Service Mathematics Teachers Completing a Graduate Diploma of Secondary Education

    Science.gov (United States)

    Hine, Gregory S. C.

    2015-01-01

    This qualitative research project explored the self-perceptions of pre-service secondary mathematics teachers completing a Graduate Diploma of Secondary Education. Specifically, the researcher investigated the extent to which teachers perceived their readiness to commence a secondary mathematics teaching position. The project relied principally on…

  3. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  4. The Cernavoda project - past and future

    International Nuclear Information System (INIS)

    Glodeanu, F.; Campureanu, T.; Chirica, T.; Popescu, D.

    1995-01-01

    The history of the Cernavoda nuclear power station in Romania is traced. It was conceived in 1977 as five unit CANDU-6 station and agreements were concluded on engineering, procurement and financial assistance with Atomic Energy of Canada Ltd (AECL) and Ansaldo of Italy. Delays in construction were created from the first, however, by efforts to manufacture as many components as possible in Romania, unfamiliarity with nuclear project management and the disadvantages of a highly centralised economy. Political changes since December 1989 have led to a new approach to project implementation. The Romanian Electricity Authority (RENEL), signed a new contract with AECL and Ansaldo in August 1991 to perform the project management for the completion of Cernavoda 1. The project has progressed very well and by the beginning of 1995 more than 90% of the plant systems were ready for commissioning and a full operating shift was in place. As a second phase of the nuclear power programme RENEL plans to complete Cernavoda 2, the construction of which was suspended at 30% completion. The three other units will be preserved in their present preliminary stage of construction up to 2000 while finance is sought for their completion. Nuclear power is seen as an environmentally clean means of meeting Romania's growing energy demand as the economy develops. (UK)

  5. The procedure for granting concessions under the Concessions Act of Republika Srpska

    Directory of Open Access Journals (Sweden)

    Borojević Klaudia

    2015-01-01

    Full Text Available The Concessions Act of Republic of Srpska entered into force in 2002. By the adoption of this Act, consessions were exteacted from the Foreign Investments Act and given significantly more attention than in the former period. As legal practice imposed the need for frequent changes of this Act, the new Concessions Act of Republica Srpska was enacted on 15th July 2013. The current legal provisions on concessions in B&H have been modelled on the recognized international standards but they still do not provide sufficient guarantees to foreign investors willing to invest their capital in infrastructure projects in Bosnia and Hercegovina. The types of concessions are clearly defined but there are many other reasons influencing the investment of foreign capital and conclusion of a concession contract, the most prominent of which are the political climate and economic stability.

  6. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  7. 75 FR 20601 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2010-04-20

    .... Proposed Project Asthma Information Reporting System (AIRS)--New--Air Pollution and Respiratory Health... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention [30Day-10-09CK] Agency Forms Undergoing Paperwork Reduction Act Review The Centers for Disease Control and prevention...

  8. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  9. Guide to the Federal Act for Protection against Nuisances

    International Nuclear Information System (INIS)

    Thomas, J.; Wiedemann, R.

    1980-07-01

    The Federal Act for Protection against Nuisances contains all legal provisions related to pollution, noise, convulsions and shocks, thermal effects and similar effects on the environment. Apart from provisions of the actual Act for Protection against Nuisances, provisions related to nuisances are to be found in a number of legal fields. The authors provide a handy, completable survey on all relevant laws, ordinances, administrative regulations and directives issued by the Government of the federation and its individual states, and on the authorities responsible for their execution. The manual helps improve the transparency of legal provisions and adminstrative competences. (HSCH) [de

  10. Long Frontal Projections Help Battus philenor (Lepidoptera: Papilionidae) Larvae Find Host Plants.

    Science.gov (United States)

    Kandori, Ikuo; Tsuchihara, Kazuko; Suzuki, Taichi A; Yokoi, Tomoyuki; Papaj, Daniel R

    2015-01-01

    Animals sometimes develop conspicuous projections on or near their heads as, e.g., weaponry, burrowing or digging tools, and probes to search for resources. The frontal projections that insects generally use to locate and assess resources are segmented appendages, including antennae, maxillary palps, and labial palps. There is no evidence to date that arthropods, including insects, use projections other than true segmental appendages to locate food. In this regard, it is noteworthy that some butterfly larvae possess a pair of long antenna-like projections on or near their heads. To date, the function of these projections has not been established. Larvae of pipevine swallowtail butterflies Battus philenor (Papilionidae) have a pair of long frontal fleshy projections that, like insect antennae generally, can be actively moved. In this study, we evaluated the possible function of this pair of long moveable frontal projections. In laboratory assays, both frontal projections and lateral ocelli were shown to increase the frequency with which search larvae found plants. The frontal projections increased finding of host and non-host plants equally, suggesting that frontal projections do not detect host-specific chemical cues. Detailed SEM study showed that putative mechanosensillae are distributed all around the frontal as well as other projections. Taken together, our findings suggest that the frontal projections and associated mechanosensillae act as vertical object detectors to obtain tactile information that, together with visual information from lateral ocelli and presumably chemical information from antennae and mouthparts, help larvae to find host plants. Field observations indicate that host plants are small and scattered in southern Arizona locations. Larvae must therefore find multiple host plants to complete development and face significant challenges in doing so. The frontal projections may thus be an adaptation for finding a scarce resource before starving to

  11. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  12. Complete genome sequence of Gordonia bronchialis type strain (3410T)

    Energy Technology Data Exchange (ETDEWEB)

    Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Sikorski, Johannes [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Jando, Marlen [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Nolan, Matt [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Chen, Feng [U.S. Department of Energy, Joint Genome Institute; Bruce, David [Los Alamos National Laboratory (LANL); Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Mavromatis, K [U.S. Department of Energy, Joint Genome Institute; Ovchinnikova, Galina [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Chen, Amy [U.S. Department of Energy, Joint Genome Institute; Palaniappan, Krishna [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Chang, Yun-Juan [ORNL; Jeffries, Cynthia [Oak Ridge National Laboratory (ORNL); Chain, Patrick S. G. [Lawrence Livermore National Laboratory (LLNL); Saunders, Elizabeth H [Los Alamos National Laboratory (LANL); Han, Cliff [Los Alamos National Laboratory (LANL); Detter, J C [U.S. Department of Energy, Joint Genome Institute; Brettin, Thomas S [ORNL; Rohde, Manfred [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Goker, Markus [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Bristow, James [U.S. Department of Energy, Joint Genome Institute; Eisen, Jonathan [U.S. Department of Energy, Joint Genome Institute; Markowitz, Victor [U.S. Department of Energy, Joint Genome Institute; Hugenholtz, Philip [U.S. Department of Energy, Joint Genome Institute; Klenk, Hans-Peter [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute

    2010-01-01

    Gordonia bronchialis Tsukamura 1971 is the type species of the genus. G. bronchialis is a human-pathogenic organism that has been isolated from a large variety of human tissues. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first completed genome sequence of the family Gordoniaceae. The 5,290,012 bp long genome with its 4,944 protein-coding and 55 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  13. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  14. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  15. Changes in heparin dose response slope during cardiac surgery: possible result in inaccuracy in predicting heparin bolus dose requirement to achieve target ACT.

    Science.gov (United States)

    Ichikawa, Junko; Mori, Tetsu; Kodaka, Mitsuharu; Nishiyama, Keiko; Ozaki, Makoto; Komori, Makiko

    2017-09-01

    The substantial interpatient variability in heparin requirement has led to the use of a heparin dose response (HDR) technique. The accuracy of Hepcon-based heparin administration in achieving a target activated clotting time (ACT) using an HDR slope remains controversial. We prospectively studied 86 adult patients scheduled for cardiac surgery requiring cardiopulmonary bypass. The total dose of calculated heparin required for patient and pump priming was administered simultaneously to achieve a target ACT of 450 s for HDR on the Hepcon HMS system. Blood samples were obtained after the induction of anesthesia, at 3 min after heparin administration and after the initiation of CPB to measure kaolin ACT, HDR slope, whole-blood heparin concentration based on the HDR slope and anti-Xa heparin concentration, antithrombin and complete blood count. The target ACT of 450 s was not achieved in 68.6% of patients. Compared with patients who achieved the target ACT, those who failed to achieve their target ACT had a significantly higher platelet count at baseline. Correlation between the HDR slope and heparin sensitivity was poor. Projected heparin concentration and anti-Xa heparin concentration are not interchangeable based on the Bland-Altman analysis. It can be hypothesized that the wide discrepancy in HDR slope versus heparin sensitivity may be explained by an inaccurate prediction of the plasma heparin level and/or the change in HDR of individual patients, depending on in vivo factors such as extravascular sequestration of heparin, decreased intrinsic antithrombin activity level and platelet count and/or activity.

  16. Canada: Darlington NPP. Project Control. Annex 4

    International Nuclear Information System (INIS)

    Wieckowski, G.

    1999-01-01

    This annex deals with project control. The just slowed down and delayed. Senior engineering, construction and procurement staff stayed with the project. Documentation was preserved though normal functioning of the records department project was completed and put into service with a few years' delay. (author)

  17. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  18. Modification as a propositional act

    DEFF Research Database (Denmark)

    Rijkhoff, Jan

    2014-01-01

    A complete functional theory of grammar should be able to specify the communicative function of each constituent in a sentence (or rather ‘Discourse Act’). Whereas predicating and referring have been given due attention in functional approaches to grammar, the modifying function of linguistic...... material in a Discourse Act has been largely ignored. This chapter argues (i) that modifying is no less actional than predicating or referring in the process of verbal communication and (ii) that the modifying function of linguistic material should be specified at the highest level of representation...

  19. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  20. Completing Quantum Mechanics with Quantized Hidden Variables

    OpenAIRE

    van Enk, S. J.

    2015-01-01

    I explore the possibility that a quantum system S may be described completely by the combination of its standard quantum state $|\\psi\\rangle$ and a (hidden) quantum state $|\\phi\\rangle$ (that lives in the same Hilbert space), such that the outcome of any standard projective measurement on the system S is determined once the two quantum states are specified. I construct an algorithm that retrieves the standard quantum-mechanical probabilities, which depend only on $|\\psi\\rangle$, by assuming t...

  1. Annual Energy Outlook 2013 with Projections to 2040

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  2. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  3. Triton X-100 as a complete liquid scintillation cocktail for counting aqueous solutions and ionic nutrient salts

    International Nuclear Information System (INIS)

    Reed, D.W.

    1984-01-01

    Triton X-100, used alone, was found to act as a complete liquid scintillation cocktail. Triton X-100 acted as a scintillator and the effect was not due to Cerenkov radiation. A variety of other commercially available surfactants also acted as scintillators, but with different levels of efficiency. Triton X-100/water combinations were suitable for counting aqueous solutions of 33 P and 86 Rb and the count rate was stable over extended periods of time. Triton X-100/toluene combinations also yielded high counting efficiencies. Triton X-100 was more sensitive to quenching than standard cocktails containing fluors. (author)

  4. The Expanded Very Large Array Project

    Science.gov (United States)

    Perley, Rick

    2012-10-01

    The Expanded Very Large Array Project, begun in 2001, is now completed -- on time, on budget, and ``on spec.'' The major goal of the project was to multiply the key observational capabilities of the Very Large Array -- the world's most powerful, versatile, and productive radio telescope -- by a factor of at least an order of magnitude by implementation of modern technologies. The result of the project is an operationally new telescope -- renamed the Jansky Very Large Array -- which is capable of new science unimagined in 1980, when the original VLA was completed. In this talk, I will review the goals of the project, and describe the new capabilities of the Jansky Very Large Array. Already, the array is providing fabulous new insights into the physics of the universe,and I will spend the majority of the time describing examples of new results.

  5. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities

  6. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  7. 77 FR 70781 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2012-11-27

    ... comments should be received within 30 days of this notice. Proposed Project Workplace Violence Prevention... prevention programs. However, little is understood about how effective these laws are in reducing violence... facility compliance with the New Jersey Violence Prevention in Health Care Facilities Act, (2) to evaluate...

  8. 76 FR 5377 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2011-01-31

    ... Budget (OMB) in compliance with the Paperwork Reduction Act (44 U.S.C. Chapter 35). To request a copy of... Project Developing a Sexual Consent Norms Instrument--New--National Center for Injury Prevention and... violence prevention strategies are increasingly focusing on promoting positive behavioral norms such as...

  9. 76 FR 23818 - Agency Forms Undergoing Paperwork Reduction Act Review

    Science.gov (United States)

    2011-04-28

    ... Project Evaluating Act Against AIDS Social Marketing Campaign Phases Targeting Consumers--New--National... concurrently. Each phase of the campaign will use mass media and direct-to-consumer channels to deliver HIV... effectiveness of these social marketing messages aimed at increasing HIV awareness and delivering HIV prevention...

  10. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  11. Geoengineering and the blockchain: a near-complete solution to greenhouse emissions?

    Science.gov (United States)

    Lockley, A.; Coffman, D.

    2016-12-01

    Geoengineering has been proposed to deal partially with the consequences ofanthropogenic global warming. This is composed of two strands - fast acting,incomplete but inexpensive solar radiation management; and carbon dioxide removal,which (if enacted quickly) has the potential to be a complete solution. We propose asystem of smart contracts, executed and made transparent by the blockchain, toprovide an economically and environmentally complete solution to carbon emissions atthe point of combustion. This will integrate CDR futures contracts and SRM carboncredits to ensure that all emissions are fully and transactionally disposed of at themoment of release. Specifically, we suggest use of an SRM 'bridge' contract, tocounter the warming caused between CDR economic activity being undertaken, andthe resultant drawdown of carbon occurring.

  12. Impact of project funding on the implementation of LEEMP ...

    African Journals Online (AJOL)

    The implementation process could make a project succeed, fail or even abandoned midstream. Information gathered from LEEMP in Imo State indicates that out of the 258 development projects embarked upon by LEEMP, only 24.4% have been completed while 75.6% are at their various completion stages after committing ...

  13. 2015 Project Portfolio: Solid-State Lighting

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-01-30

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  14. 2017 Project Portfolio: Solid-State Lighting

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  15. 76 FR 39980 - Departmental Offices; Privacy Act of 1974, as Amended

    Science.gov (United States)

    2011-07-07

    ... and electronic media. Retrievability: By taxpayer name and Taxpayer Identification Number, social...) is conducting a pilot project funded by the Partnership Fund for Program Integrity Innovation (Partnership Fund). The Partnership Fund was established by the Consolidated Appropriations Act, 2010 (Pub. L...

  16. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    Chapter six describes the basis for facility design, the completed facility conceptual design, the completed analytical work relating to the resolution of design issues, and future design-related work. The basis for design and the conceptual design information presented in this chapter meet the requirements of the Nuclear Waste Policy Act of 1982, for a conceptual repository design that takes into account site-specific requirements. This information is presented to permit a critical evaluation of planned site characterization activities. Chapter seven describes waste package components, emplacement environment, design, and status of research and development that support the Nevada Nuclear Waste Storage Investigation (NNWSI) Project. The site characterization plan (SCP) discussion of waste package components is contained entirely within this chapter. The discussion of emplacement environment in this chapter is limited to considerations of the environment that influence, or which may influence, if perturbed, the waste packages and their performance (particularly hydrogeology, geochemistry, and borehole stability). The basis for conceptual waste package design as well as a description of the design is included in this chapter. The complete design will be reported in the advanced conceptual design (ACD) report and is not duplicated in the SCP. 367 refs., 173 figs., 68 tabs.

  17. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    International Nuclear Information System (INIS)

    1988-01-01

    Chapter six describes the basis for facility design, the completed facility conceptual design, the completed analytical work relating to the resolution of design issues, and future design-related work. The basis for design and the conceptual design information presented in this chapter meet the requiremenrs of the Nuclear Waste Policy Act of 1982, for a conceptual repository design that takes into account site-specific requirements. This information is presented to permit a critical evaluation of planned site characterization activities. Chapter seven describes waste package components, emplacement environment, design, and status of research and development that support the Nevada Nuclear Waste Storage Investigation (NNWSI) Project. The site characterization plan (SCP) discussion of waste package components is contained entirely within this chapter. The discussion of emplacement environment in this chapter is limited to considerations of the environment that influence, or which may influence, if perturbed, the waste packages and their performance (particularly hydrogeology, geochemistry, and borehole stability). The basis for conceptual waste package design as well as a description of the design is included in this chapter. The complete design will be reported in the advanced conceptual design (ACD) report and is not duplicated in the SCP. 367 refs., 173 figs., 68 tabs

  18. Water Integration Project Science Strategies White Paper

    International Nuclear Information System (INIS)

    Alan K. Yonk

    2003-01-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document

  19. Water Integration Project Science Strategies White Paper

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  20. Public relations strategy for the completion of Angra 2 nuclear power plant

    International Nuclear Information System (INIS)

    Kepinski, Alessandra

    1998-01-01

    governmental organization, ABEN had more flexibility and could act more quickly; and, being basically an association of nuclear professionals, it had more credibility from the Press and the general public and could act on a national level. In order to gain public and governmental support for the completion of the Angra 2 project, ABEN launched its Public Acceptance Program has received financial support from FURNAS and other organizations of the nuclear sector that would have difficulties in promoting such a campaign on their own. As part of the ABEN Public Acceptance Program, a set of 'opinion-forming' individuals was selected and put, at no cost, on the mailing list of ABEN's journal - 'Brasil Nuclear', to provide them with reliable information on nuclear energy. The second part of ABEN's Program was to engage a press agent in order to break the media prejudices and to get positive and correct reports. An extensive program of visits to the Angra site was organized in conjunction with FURNAS and the visitors - mostly journalists, authorities and politicians - were always accompanied by qualified officials, in order to answer any questions that could arise. As a result, when the Federal Government authorized the completion of Angra 2 in December 1994, some very favorable statements were published. It is also believed that some previous and more balanced media reports helped to influence favorably the behavior of some political leaders. At that time - 1993/94 - the Greenpeace Movement and many local environmental NGO's were involved in a very heavy campaign against the completion of Angra 2 In order to enable the general public to see 'the other side', FURNAS officials took part in every possible event where the nuclear issues were discussed, such as debates in the media, conferences, workshops promoted by Universities, Technical Associations, State and Local Legislative Chambers, etc. FURNAS also sponsored and took part in several commercial fairs and public exhibitions. This

  1. CERN reacts to increased costs to completion of the LHC

    CERN Multimedia

    2002-01-01

    Aspects of LHC construction. The CERN Council, where the representatives of the 20 Member States of the Organization decide on scientific programmes and financial resources, held its 120th session on 14 December under the chairmanship of Prof. Maurice Bourquin (CH). CERN adjusts to the LHC Director-General, Luciano Maiani, stressed that CERN was now fully engaged in the LHC and outlined the first moves to react to the increased cost to completion of the LHC. The new accelerator is an extremely complex, high-tech project which CERN is building under very severe conditions. However, the technical challenges are solved and industrial production of accelerator elements, and installation are starting. Professor Maiani said that 2001 had been a very hard but decisive year for CERN. An important milestone had been passed during this meeting with the approval of the LHC dipole magnets contract, the last major contract for the accelerator. The new costs to completion of the LHC project are now clear. A first propos...

  2. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  3. 77 FR 26583 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Petroleum...

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF JUSTICE Antitrust Division Notice Pursuant to the National Cooperative Research and Production Act of 1993--Petroleum Environmental Research Forum Project No. 2011-01, Ultra Low Nutrient...''), Petroleum Environmental Research Forum (PERF) Project No. 2011-01, Ultra Low Nutrient Control in Wastewater...

  4. International Energy Outlook 2016 With Projections to 2040

    Energy Technology Data Exchange (ETDEWEB)

    Conti, John [USDOE Energy Information Administration (EIA), Washington, DC (United States). Office of Petroleum, Natural Gas, and Biofuels Analysis; Holtberg, Paul [USDOE Energy Information Administration (EIA), Washington, DC (United States). Analysis Integration Team; Diefenderfer, Jim [USDOE Energy Information Administration (EIA), Washington, DC (United States). Office of Electricity, Coal, Nuclear, and Renewables Analysis; LaRose, Angelina [USDOE Energy Information Administration (EIA), Washington, DC (United States). Office of Integrated and International Energy Analysis; Turnure, James T. [USDOE Energy Information Administration (EIA), Washington, DC (United States). Office of Energy Consumption and Efficiency Analysis; Westfall, Lynn [USDOE Energy Information Administration (EIA), Washington, DC (United States). Office of Energy Markets and Financial Analysis

    2016-05-01

    The International Energy Outlook 2016 (IEO2016) presents an assessment by the U.S. Energy Information Administration (EIA) of the outlook for international energy markets through 2040. U.S. projections appearing in IEO2016 are consistent with those published in EIA’s Annual Energy Outlook 2015 (AEO2015). IEO2016 is provided as a service to energy managers and analysts, both in government and in the private sector. The projections are used by international agencies, federal and state governments, trade associations, and other planners and decisionmakers. They are published pursuant to the Department of Energy Organization Act of 1977 (Public Law 95-91), Section 205(c). The IEO2016 energy consumption projections are divided according to Organization for Economic Cooperation and Development members (OECD) and nonmembers (non-OECD). OECD members are divided into three basic country groupings: OECD Americas (United States, Canada, and Mexico/Chile), OECD Europe, and OECD Asia (Japan, South Korea, and Australia/New Zealand). Non-OECD countries are divided into five separate regional subgroups: non-OECD Europe and Eurasia (which includes Russia); non-OECD Asia (which includes China and India); Middle East; Africa; and non-OECD Americas (which includes Brazil). In some instances, the IEO2016 energy production models have different regional aggregations to reflect important production sources (for example, Middle East OPEC is a key region in the projections for liquids production). Complete regional definitions are listed in Appendix M. IEO2016 focuses exclusively on marketed energy. Nonmarketed energy sources, which continue to play an important role in some developing countries, are not included in the estimates. The IEO2016 projections are based on existing U.S. and foreign government laws and regulations. In general, IEO2016 reflects the effects of current policies—often stated through regulations—within the projections. EIA analysts attempt to interpret the

  5. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  6. Regulation of the complete fuel cycle current and proposed nuclear legislation in Canada

    International Nuclear Information System (INIS)

    Boyd, F.C.

    1978-01-01

    The increasing complexity of the Canadian nuclear programme, the problems of contamination and uranium mine safety and the national and international concern about proliferation have emphasized the need for a systematic and strong control over nuclear activities. Although the 1946 Atomic Energy Control Act provides the Atomic Energy Control Board with most of the powers necessary to achieve this, the new Act has been introduced to clarify jurisdiction and to strengthen the Board, which would then be renamed the Nuclear Control Board. Its duty would be to control health, safety and the environmental and other security aspects of the complete fuel cycle. (NEA) [fr

  7. Environmental impact analysis: the first five years of the National Environmental Policy Act in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Thorold, O

    1975-11-01

    The National Environmental Policy Act (NEPA) of 1969 was the first comprehensive law to subject decisions to an assessment of total environmental consequence and instill environmental attitudes throughout government. All agencies must submit impact projections of proposed as well as alternative actions. Twenty-one states have passed similar legislation. A review of the Act's provisions for oversight, court action, timing, content, and commenting procedures is followed by a five-year evaluation. Because NEPA is generally felt to be a realistic approach to decision making and not a substitute for other kinds of environmental control, Mr. Thorold feels the American experience has been positive and is worth modifying for other countries. The Act lacked a ''grandfather clause,'' which caused a difficult transition period while agencies coped with both new and existing projects and developed standards for identifying and reviewing impacts. As agencies recognized that delays from lawsuits often resulted from inadequate impact statements, the quality improved to meet the strict guidelines of the Council on Environmental Quality. Joint efforts of agencies, universities, consulting firms, and private groups have cooperated to improve environmental forecasting and promote full communication. The costs of preparing statements and those of abandoned projects are felt to be conservative when compared to the costs of pursuing inappropriate projects. (21 references) (DCK)

  8. 78 FR 29335 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2013-05-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal... 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD...

  9. 77 FR 69601 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2012-11-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... to demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act... the NDAA for FY 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects...

  10. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  11. Simulation of investment returns of toll projects.

    Science.gov (United States)

    2013-08-01

    This research develops a methodological framework to illustrate key stages in applying the simulation of investment returns of toll projects, acting as an example process of helping agencies conduct numerical risk analysis by taking certain uncertain...

  12. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  13. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  14. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transpot project-demonstration act system definition

    Science.gov (United States)

    Hanks, G. W.; Shomber, H. A.; Crumb, C. B.; Flora, C. C.; Macdonald, K. A. B.; Smith, R. D.; Sassi, A. P.; Dorwart, R. J.

    1982-01-01

    The 1985 ACT airplane is the Final Active Controls Technology (ACT) Airplane with the addition of three-axis fly by wire. Thus it retains all the efficiency features of the full ACT system plus the weight and cost savings accruing from deletion of the mechanical control system. The control system implements the full IAAC spectrum of active controls except flutter-mode control, judged essentially nonbeneficial, and incorporates new control surfaces called flaperons to make the most of wing-load alleviation. This redundant electronic system is conservatively designed to preserve the extreme reliability required of crucial short-period pitch augmentation, which provides more than half of the fuel savings.

  15. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  16. Experimental Evidence on the Effect of Childhood Investments on Postsecondary Attainment and Degree Completion

    Science.gov (United States)

    Dynarski, Susan; Hyman, Joshua; Schanzenbach, Diane Whitmore

    2013-01-01

    This paper examines the effect of early childhood investments on college enrollment and degree completion. We used the random assignment in Project STAR (the Tennessee Student/Teacher Achievement Ratio experiment) to estimate the effect of smaller classes in primary school on college entry, college choice, and degree completion. We improve on…

  17. Decoding Delay Controlled Completion Time Reduction in Instantly Decodable Network Coding

    KAUST Repository

    Douik, Ahmed

    2016-06-27

    For several years, the completion time and the decoding delay problems in Instantly Decodable Network Coding (IDNC) were considered separately and were thought to act completely against each other. Recently, some works aimed to balance the effects of these two important IDNC metrics but none of them studied a further optimization of one by controlling the other. This paper investigates the effect of controlling the decoding delay to reduce the completion time below its currently best-known solution in both perfect and imperfect feedback with persistent erasure channels. To solve the problem, the decodingdelay- dependent expressions of the users’ and overall completion times are derived in the complete feedback scenario. Although using such expressions to find the optimal overall completion time is NP-hard, the paper proposes two novel heuristics that minimizes the probability of increasing the maximum of these decoding-delay-dependent completion time expressions after each transmission through a layered control of their decoding delays. Afterward, the paper extends the study to the imperfect feedback scenario in which uncertainties at the sender affects its ability to anticipate accurately the decoding delay increase at each user. The paper formulates the problem in such environment and derives the expression of the minimum increase in the completion time. Simulation results show the performance of the proposed solutions and suggest that both heuristics achieves a lower mean completion time as compared to the best-known heuristics for the completion time reduction in perfect and imperfect feedback. The gap in performance becomes more significant as the erasure of the channel increases.

  18. Decoding Delay Controlled Completion Time Reduction in Instantly Decodable Network Coding

    KAUST Repository

    Douik, Ahmed S.; Sorour, Sameh; Al-Naffouri, Tareq Y.; Alouini, Mohamed-Slim

    2016-01-01

    For several years, the completion time and the decoding delay problems in Instantly Decodable Network Coding (IDNC) were considered separately and were thought to act completely against each other. Recently, some works aimed to balance the effects of these two important IDNC metrics but none of them studied a further optimization of one by controlling the other. This paper investigates the effect of controlling the decoding delay to reduce the completion time below its currently best-known solution in both perfect and imperfect feedback with persistent erasure channels. To solve the problem, the decodingdelay- dependent expressions of the users’ and overall completion times are derived in the complete feedback scenario. Although using such expressions to find the optimal overall completion time is NP-hard, the paper proposes two novel heuristics that minimizes the probability of increasing the maximum of these decoding-delay-dependent completion time expressions after each transmission through a layered control of their decoding delays. Afterward, the paper extends the study to the imperfect feedback scenario in which uncertainties at the sender affects its ability to anticipate accurately the decoding delay increase at each user. The paper formulates the problem in such environment and derives the expression of the minimum increase in the completion time. Simulation results show the performance of the proposed solutions and suggest that both heuristics achieves a lower mean completion time as compared to the best-known heuristics for the completion time reduction in perfect and imperfect feedback. The gap in performance becomes more significant as the erasure of the channel increases.

  19. Psychological characteristics of eating disorders as evidenced by the combined administration of questionnaires and two projective methods: the Tree Drawing Test (Baum Test) and the Sentence Completion Test.

    Science.gov (United States)

    Mizuta, Ichiro; Inoue, Yoichi; Fukunaga, Tomoko; Ishi, Ryohei; Ogawa, Asao; Takeda, Masatoshi

    2002-02-01

    The objective of this study is to examine psychological/psychopathological characteristics of eating disorders and their subtypes through a combined administration of questionnaires and projective tests. Three questionnaires (Eating Disorder Inventory - 2, Social Adaptation Scale, Southern California University Eating Disorder Inventory - Revised) and two projective tests (the Tree Drawing Test [TDT, Baum Test], and the Sentence Completion Test [SCT]) were administered to 126 female patients between the ages of 15 and 30 years, with eating disorders according to DSM-IV criteria at our outpatient clinic, and to 54 sex- and age-matched control subjects. The purging subtypes of eating disorders (anorexia nervosa - binge-eating/purging type [ANBP] and bulimia nervosa - purging type [BNP]) were clearly differentiated from the controls, both by the questionnaires and the projective tests. Compared with the controls, ANBP/BNP showed more problematic profiles across the three questionnaires, drew smaller and poorer trees in TDT to a more left location on the drawing paper, and gave fewer positive, and more negative responses in SCT. In contrast, few significant differences were found between anorexia nervosa- restricting type (ANR) and the controls, and between ANBP and BNP. As a trend, however, ANR was consistently located between the controls and ANBP/BNP across the whole questionnaires and projective tests.

  20. Notification: Audit of CSB's Compliance with the Cybersecurity Act of 2015

    Science.gov (United States)

    Project #OA-FY16-0127, March 14, 2016. The EPA OIG plans to begin fieldwork for an audit of the U.S. CSB's compliance with the mandated “Inspector General Report on Covered Systems,” as outlined in the Cybersecurity Act of 2015.

  1. Predictors of completed childhood vaccination in Bolivia.

    Science.gov (United States)

    Osetinsky, Brianna; Gaydos, Laura M; Leon, Juan S

    This project examines how access issues, ethnicity, and geographic region affect vaccination of children by two years of age in Bolivia. Bolivia's rich variation in culture and geography results in unequal healthcare utilization even for basic interventions such as childhood vaccination. This study utilizes secondary data from the 2008 Demographic and Health Survey for Bolivia to examine predictors of vaccination completion in children by two years of age. Using logistic regression methods, we control for health system variables (difficulty getting to a health center and type of health center as well as demographic and socio-economic covariates). The results indicated that children whose parents reported distance as a problem in obtaining health care were less likely to have completed all vaccinations. Ethnicity was not independently statistically significant, however, in a sub-analysis, people from the Quechua ethnic group were more likely to report 'distance as a problem in obtaining healthcare.' Surprisingly, living in a rural environment has a protective effect on completed vaccinations. However, geographic region did predict significant differences in the probability that children would be fully vaccinated; children in the region with the lowest vaccination completion coverage were 80% less likely to have completed vaccination compared to children in the best performing region, which may indicate unequal access and utilization of health services nationally. Further study of regional differences, urbanicity, and distance as a healthcare access problem will help refine implications for the Bolivian health system.

  2. Forty project management strategies for the medical practice staff.

    Science.gov (United States)

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget.

  3. Kansas Advanced Semiconductor Project: Final Report

    International Nuclear Information System (INIS)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-01-01

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  4. CHEMVAL project

    International Nuclear Information System (INIS)

    Chandratillake, M.; Falck, W.E.; Read, D.

    1992-01-01

    This report summarises the development history of the CHEMVAL Thermodynamic Database, the criteria employed for data selection and the contents of Version 4.0, issued to participants on the completion of the project. It accompanies a listing of the database constructed using the dBase III + /IV database management package. (Author)

  5. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  6. Complete genome sequence of Acidimicrobium ferrooxidans type strain (ICPT)

    Energy Technology Data Exchange (ETDEWEB)

    Clum, Alicia; Nolan, Matt; Lang, Elke; Glavina Del Rio, Tijana; Tice, Hope; Copeland, Alex; Cheng, Jan-Fang; Lucas, Susan; Chen, Feng; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavrommatis, Konstantinos; Mikhailova, Natalia; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Goker, Markus; Spring, Stefan; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia C.; Chain, Patrick; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter; Lapidus, Alla

    2009-05-20

    Acidimicrobium ferrooxidans (Clark and Norris 1996) is the sole and type species of the genus, which until recently was the only genus within the actinobacterial family Acidimicrobiaceae and in the order Acidomicrobiales. Rapid oxidation of iron pyrite during autotrophic growth in the absence of an enhanced CO2 concentration is characteristic for A. ferrooxidans. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of the order Acidomicrobiales, and the 2,158,157 bp long single replicon genome with its 2038 protein coding and 54 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  7. Holomorphic Yukawa couplings for complete intersection Calabi-Yau manifolds

    Energy Technology Data Exchange (ETDEWEB)

    Blesneag, Stefan [Rudolf Peierls Centre for Theoretical Physics, Oxford University,1 Keble Road, Oxford, OX1 3NP (United Kingdom); Buchbinder, Evgeny I. [The University of Western Australia,35 Stirling Highway, Crawley WA 6009 (Australia); Lukas, Andre [Rudolf Peierls Centre for Theoretical Physics, Oxford University,1 Keble Road, Oxford, OX1 3NP (United Kingdom)

    2017-01-27

    We develop methods to compute holomorphic Yukawa couplings for heterotic compactifications on complete intersection Calabi-Yau manifolds, generalising results of an earlier paper for Calabi-Yau hypersurfaces. Our methods are based on constructing the required bundle-valued forms explicitly and evaluating the relevant integrals over the projective ambient space. We also show how our approach relates to an earlier, algebraic one to calculate the holomorphic Yukawa couplings. A vanishing theorem, which we prove, implies that certain Yukawa couplings allowed by low-energy symmetries are zero due to topological reasons. To illustrate our methods, we calculate Yukawa couplings for SU(5)-based standard models on a co-dimension two complete intersection manifold.

  8. The Cordoba and Wolsung projects: a progress report

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1977-06-01

    The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a renegotiation of the contract. However, following this, good progress has been made and the current forecast completion date in 1980 is expected to be achieved. The Wolsung project experienced difficulties early in the project due to site conditions, so that site work commenced some 9-10 months later than originally planned. These difficulties had predictable effects upon the progress of site-related engineering and it is expected that the project completion date will be somewhat delayed

  9. Quantum theory and questions of reality and completeness

    International Nuclear Information System (INIS)

    Andaas, H.E.; Gjoetterud, O.K.

    1991-10-01

    The authors discuss how the description of a two-particle spin-1/2 system prepared in a singlet state, a product state of definite total spin-projection and a specified mixture relates to the EPR conceptions of reality, locality and completeness and to Jarrets interpretations and representations of these concepts by probability statements. The importance of the state-preparation procedures and their relevance in this context is emphasized. The position of Bell's inequalities is also discussed. It is concluded that the inequalities have a limited power in deciding whether or not a system requires a quantal description, and that making a priori claims on reality and completeness is a too narrow scheme to describe quantal phenomena. 21 refs., 4 figs

  10. Quantum theory and questions of reality and completeness

    International Nuclear Information System (INIS)

    Andaas, H.E.; Gjoetterud, O.K.

    1992-07-01

    The authors discuss how the description of a two-particle spin-1/2 system prepared in a singlet state, a product state of definite total spin-projection and a specified mixture relates to the EPR conceptions of reality, locality and completeness and to Jarrets interpretations and representations of these concepts by probability statements. The importance of the state-preparation procedures and their relevance in this context is emphasized. The position of Bell's inequalities is also discussed. It is concluded that the inequalities have a limited power in deciding whether or not a system requires a quantal decription and that making a priori claims on reality and completeness is a too narrow scheme to describe quantal phenomena. 22 refs. 4 figs

  11. ELECTRONIC COMPLIANCE AND APPROVAL PROJECT (ECAP)

    Energy Technology Data Exchange (ETDEWEB)

    Hope Morgan; Richard A. Varela; Deborah LaHood; Susan Cisco; Mary Ann Benavides; Donna Burks

    2002-11-01

    The Texas Railroad Commission (RRC), working in partnership with the United States Department of Energy and the oil and gas industry it regulates, is implementing a strategy for improving efficiency in regulations and significantly reducing administrative operating costs through the Electronic Compliance and Approval Process (ECAP). The project will streamline regulatory compliance and reporting by providing the ability to electronically submit, process, and query oil and gas applications and reports through the Internet-based ECAP system. Implementation of an ECAP drilling permit pilot project began September 1999 after funding resources were secured--a $700,000 grant from the U.S. Department of Energy and an appropriation of $1.4 million from the Texas Legislature. The pilot project involves creating the ability to file, review, and approve a well's drilling permit application through a completely electronic process. The pilot project solution will ultimately provide the infrastructure, technology, and electronic modules to enable the filing of all compliance permits and performance reports through the internet from a desktop computer. The pilot project was conducted in three phases. The first phase, implemented May 2000, provided the infrastructure that allows the electronic filing and approval of simple drilling permit applications, associated fees, and attachments. The official ''roll-out'' of ECAP and the first electronically filed drilling permit application occurred on May 11, 2000 in Dallas in conjunction with an Internet Workshop sponsored by the Petroleum Technology Transfer Council. After the completion of Phase I, the ECAP team conducted an extensive review of progress to date and analyzed requirements and opportunities for future steps. The technical team identified core infrastructure modifications that would facilitate and better support future development and expansion of the ECAP system and work began on database structure

  12. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  13. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  14. 77 FR 13388 - Treasury Inspector General for Tax Administration; Privacy Act of 1974: Computer Matching Program

    Science.gov (United States)

    2012-03-06

    ... DEPARTMENT OF THE TREASURY Treasury Inspector General for Tax Administration; Privacy Act of 1974...: Notice. SUMMARY: Pursuant to 5 U.S.C. 552a, the Privacy Act of 1974, as amended, notice is hereby given... Administration. Beginning and Completion Dates: This program of computer matches is expected to commence on March...

  15. The Role and Current Status of IFRS in the Completion of National Accounting Rules – Evidence from Denmark

    DEFF Research Database (Denmark)

    Thinggaard, Frank

    2017-01-01

    I analyse the influence of IFRS on the Danish accounting regulation based on the EU Accounting Directive. In Denmark, the EU Accounting Directive is brought into force through the Danish Financial Statements Act. The analysis shows that the provisions in the Act are aligned with the IFRS to a great...... extent. It also shows that the Danish legislators extensively refer to IFRS and that they consider the IFRS to be the source to use for completing the national rules. I additionally show that the enforcers of the Danish Financial Statements Act look to the IFRS for guidance when they interpret...

  16. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  17. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  18. The Aggregate and Distributional Effects of the Tax Reform Act of 1986 on Firm Valuation.

    OpenAIRE

    Givoly, Dan; Hayn, Carla

    1991-01-01

    The authors examine the aggregate and distributional effects of the Tax Reform Act of 1986 on equity values of publicly traded corporations. The results show that the effect of the act on the aggregate equity value of corporations was consistent with the present value of the projected added tax collection from the corporate sector. The cross-sectional variation in the magnitude and direction of the stock price response to the Tax Reform Act of 1986 was a function of both the direct and indire...

  19. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  20. Recovery Act. Advanced Load Identification and Management for Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yi [Eaton Corporation, Menomonee Falls, WI (United States); Casey, Patrick [Eaton Corporation, Menomonee Falls, WI (United States); Du, Liang [Eaton Corporation, Menomonee Falls, WI (United States); He, Dawei [Eaton Corporation, Menomonee Falls, WI (United States)

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions

  1. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 1: Executive summary

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to comply with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act to the US Army Engineer District, Alaska (Corps). The application initiated the review process for BPXA's proposed project to develop and produce oil and gas from the Northstar Unit. The National Environmental Policy Act (NEPA) requires preparation of an Environmental Impact Statement (EIS) prior to any federal action that may significantly affect the quality of the human environment. The EIS is intended to provide federal agencies with information about the consequences of a proposed project and to disclose that information to the public, soliciting their comments, prior to the agencies making decisions on the project

  2. The cognitive roles of behavioral variability: idiosyncratic acts as the foundation of identity and as transitional, preparatory, and confirmatory phases.

    Science.gov (United States)

    Eilam, David

    2015-02-01

    Behavior in obsessive compulsive disorder (OCD), in habitual daily tasks, and in sport and cultural rituals is deconstructed into elemental acts and categorized into common acts, performed by all individuals completing a similar task, and idiosyncratic acts, not performed by all individuals. Never skipped, common acts establish the pragmatic part of motor tasks. Repetitive performance of a few common acts renders rituals a rigid form, whereby common acts may serve as memes for cultural transmission. While idiosyncratic acts are not pragmatically necessary for task completion, they fulfill important cognitive roles. They form a long preparatory phase in tasks that involve high stakes, and a long confirmatory phase in OCD rituals. Idiosyncratic acts also form transitional phases between motor tasks, and are involved in establishing identity and preserving the flexibility necessary for adapting to varying circumstances. Behavioral variability, as manifested in idiosyncrasy, thus does not seem to be a noise or by-product of motor activity, but an essential cognitive component that has been preserved in the evolution of behavioral patterns, similar to the genetic variability in biology. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Long-acting reversible contraceptive acceptability and unintended pregnancy among women presenting for short-acting methods: a randomized patient preference trial.

    Science.gov (United States)

    Hubacher, David; Spector, Hannah; Monteith, Charles; Chen, Pai-Lien; Hart, Catherine

    2017-02-01

    participants, 43% chose randomization and 57% chose the preference option. Complete loss to follow-up at 12 months was method continuation probabilities were 63.3% (95% confidence interval, 58.9-67.3) (preference short-acting reversible contraception), 53.0% (95% confidence interval, 45.7-59.8) (randomized short-acting reversible contraception), and 77.8% (95% confidence interval, 71.0-83.2) (randomized long-acting reversible contraception) (P contraception), 7.7% (95% confidence interval, 3.3-12.1) (randomized short-acting reversible contraception), and 0.7% (95% confidence interval, 0.0-4.7) (randomized long-acting reversible contraception) (P = .01 when comparing randomized groups). In the secondary comparisons involving only short-acting reversible contraception users, the continuation probability was higher in the preference group compared with the randomized group (P = .04). However, the short-acting reversible contraception randomized group and short-acting reversible contraception preference group had statistically equivalent rates of unintended pregnancy (P = .77). Seventy-eight percent of randomized long-acting reversible contraception users were happy/neutral with their initial method, compared with 89% of randomized short-acting reversible contraception users (P method continuers at 12 months, all groups were equally happy/neutral (>90%). Even in a typical population of women who presented to initiate or continue short-acting reversible contraception, long-acting reversible contraception proved highly acceptable. One year after initiation, women randomized to long-acting reversible contraception had high continuation rates and consequently experienced superior protection from unintended pregnancy compared with women using short-acting reversible contraception; these findings are attributable to the initial technology and not underlying factors that often bias observational estimates of effectiveness. The similarly patterned experiences of the 2 short-acting

  4. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  5. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  6. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  7. BPA riparian fencing and alternative water development projects completed within Asotin Creek Watershed ; 2000 and 2001 Asotin Creek fencing final report of accomplishments

    International Nuclear Information System (INIS)

    Johnson, B.J.Bradley J.

    2002-01-01

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84

  8. 78 FR 71645 - Pilot Project for Tribal Jurisdiction over Crimes of Domestic Violence

    Science.gov (United States)

    2013-11-29

    ...This final notice establishes procedures for Indian tribes to request designation as participating tribes under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, under the voluntary pilot project described in the Violence Against Women Reauthorization Act; establishes procedures for the Attorney General to act on such requests; and solicits such requests from Indian tribes.

  9. The costs of completing unfinished US nuclear power plants

    International Nuclear Information System (INIS)

    Feldman, S.L.; Bernstein, M.A.; Noland, R.B.

    1988-01-01

    A cost benefit analysis is performed to assess the costs of completing unfinished nuclear power plants in four regions of the United States of America, (north-east, south-east, mid-west and west). The analysis is in five main sections: the projection of the cost to complete nuclear plants under construction, the forecast of future operations and maintenance costs, the forecast of price of fuels, the evaluation of future electricity demand and capacity growth, and calculation of the financial cost-benefit ratio based on the preceding figures. It was found that in the north-east, mid-west and west, because the demand for the power will not be made before the year 2000, finishing the units is not the least-cost supply option. Therefore, most of the units should not be finished unless over 90% completed already, in which case it may be cost-effective to finish them. (author)

  10. Yeager Airport Hydrogen Vehicle Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Williams [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  11. Pilot project "The zoo goes to school", enriching the classroom

    Directory of Open Access Journals (Sweden)

    Michel Mendes

    2014-12-01

    Full Text Available Environmental education does not only occur in formal institutions, and yes has been widely disseminated among non formal spaces of education, which complements its ecological and social nature. Zoos are the institutions that play an important role in environmental education, raising awareness and preparing citizens to act in the critically and ethical society, committed to the environment. The objective of this study was to evaluate the environmental perception of students in 7th grade of elementary school in Municipal Elementary School Jardelino Ramos, in partnership with the Zoo, University of Caxias do Sul. Twenty-four questionnaires were applied in order to diagnose the environmental perception of students through four questions regarding activities at the zoo. After it was contextualized and discussed on the topics: zoos and their history, function, animals and their enclosures, technical education and environmental enrichment. To complement the enrichment technique discussed in class, the students sewed materials that were later added to the precincts of animals chosen for themselves. A week after the project is completed was held again the questionnaire to verify the results obtained from the project. These were analyzed, discussed and compared through graphs, which show that the objectives were achieved and the didactics used was efficient, as described in the article.

  12. Completed suicide in an autopsy-confirmed case of early onset Alzheimer's disease.

    Science.gov (United States)

    Hartzell, Jennifer Wiener; Geary, Richard; Gyure, Kymberly; Chivukula, Venkata Ravi; Haut, Marc W

    2018-04-01

    We report a case of a 57-year-old male with clinically diagnosed and autopsy-confirmed early onset Alzheimer's disease who completed suicide by gunshot wound to the chest. This case has several unique aspects that have not been discussed in previous case reports of completed suicide in Alzheimer's disease. In particular, our patient's death was highly planned with successful compensation for his cognitive deficits. After all firearms had been removed from the home as a safety precaution, he obtained a new weapon, hid it and left himself cues to find and use it. The case is discussed in the context of literature differentiating the neural circuitry propagating impulsive versus planned suicidal acts.

  13. East Asia basin Analysis Project

    International Nuclear Information System (INIS)

    Terman, M.J.

    1986-01-01

    The United Nations-related Committee for Coordination of Joint Prospecting for Mineral Resources in Asian Offshore Areas (CCOP), in cooperation with the International Union of Geological Sciences and Circum-Pacific Council, is implementing the East Asia Basin Analysis Project. National and regional organizations, principally members of the ASEAN Council of Petroleum, are compiling maps at a scale of 1:2 million and stratigraphic cross sections of basins, with particular initial emphasis on defining and assessing oil and gas plays and with later analytical focus on other sedimentary minerals (e.g., coal, phosphate, evaporites, and uranium). Completion is anticipated in 1988. Two major elements of the project are being contributed from other agencies. (1) Base maps. - The US Geological Survey (USGS) has partly compiled eight sheets covering east Asia that show bathymetry, shorelines, and drainage systems. One sheet also presents topography and selected cultural features. All sheets are scheduled to be completed in 1987. (2) Geotectonic maps. - The Working Group on Studies of East Asian Tectonics and Resources (SEATAR) is now completing 10 transect studies with crustal profiles and strip maps at a scale of 1:1 million. One map for each transect shows a plate tectonic interpretation. Transect coordinators or others will be encouraged to extrapolate between the strips and complete the geotectonic interpretation (on USGS bases) in 1987. The IGCP Project 220 is also compiling on (USGS bases) the tin and tungsten granites of east Asia, emphasizing geochemical data needed to identify predictive models. Other mapping will probably follow mineral-deposit modeling workshops on ophiolotic chromite and regional symposia on oceanic massive sulfide and subvolcanic gold and base metals. Completion may be possible by 1989

  14. A Note on Axiomatizations of Pavelka-style Complete Fuzzy Logics

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr

    2016-01-01

    Roč. 292, 1 June (2016), s. 160-174 ISSN 0165-0114 R&D Projects: GA ČR GAP202/10/1826 Institutional support: RVO:67985807 Keywords : mathematical fuzzy logic * Pavelka-style completeness * MTL logic * Lukasiewicz logics * Product Logic * truth constants * Monteiro–Baaz delta Subject RIV: BA - General Mathematics Impact factor: 2.718, year: 2016

  15. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  16. Hualapai Wind Project Feasibility Report

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, Kevin [Hualapai Tribe; Randall, Mark [Daystar Consulting; Isham, Tom [Power Engineers; Horna, Marion J [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.

    2012-12-20

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  17. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  18. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  19. Pacific Northwest Smart Grid Demonstration Project Technology Performance Report Volume 1: Technology Performance

    Energy Technology Data Exchange (ETDEWEB)

    Melton, Ron [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-06-01

    The Pacific Northwest Smart Grid Demonstration (PNWSGD), a $179 million project that was co-funded by the U.S. Department of Energy (DOE) in late 2009, was one of the largest and most comprehensive demonstrations of electricity grid modernization ever completed. The project was one of 16 regional smart grid demonstrations funded by the American Recovery and Reinvestment Act. It was the only demonstration that included multiple states and cooperation from multiple electric utilities, including rural electric co-ops, investor-owned, municipal, and other public utilities. No fewer than 55 unique instantiations of distinct smart grid systems were demonstrated at the projects’ sites. The local objectives for these systems included improved reliability, energy conservation, improved efficiency, and demand responsiveness. The demonstration developed and deployed an innovative transactive system, unique in the world, that coordinated many of the project’s distributed energy resources and demand-responsive components. With the transactive system, additional regional objectives were also addressed, including the mitigation of renewable energy intermittency and the flattening of system load. Using the transactive system, the project coordinated a regional response across the 11 utilities. This region-wide connection from the transmission system down to individual premises equipment was one of the major successes of the project. The project showed that this can be done and assets at the end points can respond dynamically on a wide scale. In principle, a transactive system of this type might eventually help coordinate electricity supply, transmission, distribution, and end uses by distributing mostly automated control responsibilities among the many distributed smart grid domain members and their smart devices.

  20. Concatenated image completion via tensor augmentation and completion

    OpenAIRE

    Bengua, Johann A.; Tuan, Hoang D.; Phien, Ho N.; Do, Minh N.

    2016-01-01

    This paper proposes a novel framework called concatenated image completion via tensor augmentation and completion (ICTAC), which recovers missing entries of color images with high accuracy. Typical images are second- or third-order tensors (2D/3D) depending if they are grayscale or color, hence tensor completion algorithms are ideal for their recovery. The proposed framework performs image completion by concatenating copies of a single image that has missing entries into a third-order tensor,...

  1. Impact of the 1986 amendments to the Safe Drinking Water Act on the State of Mississippi. Technical completion report

    International Nuclear Information System (INIS)

    Sherrard, J.H.; Gibson, P.W.

    1991-10-01

    As a result of the U.S. Congress passing the 1986 Amendments to the Safe Drinking Water Act, the number of regulated contaminants that must be monitored in public water systems has increased from 24 to 85. The economic impact of the new legislation is greater on small systems than large systems because of economies of scale. In addition, more highly trained water treatment plant operators will be needed to deal with the complex legislation and to ensure the continuous supply of safe drinking water to their communities. Because of the complexity and increased scope of the 1986 Amendments to the Safe Drinking Water Act, a detailed discussion of the requirements that must be met by each public water supply is presented as background information. The objectives of the research were to: (1) determine the economic impacts of the 1986 Amendments on water systems throughout the State of Mississippi, (2) determine the number of systems that will need new and/or upgraded treatments technology to comply with the regulations, and (3) provide an assessment of the needs of the State DWS

  2. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  3. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  4. Technical progress report: Rhode Island crystalline repository project, calendar year 1985

    International Nuclear Information System (INIS)

    Vild, B.F.

    1985-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provides financial support to affected states to participate in the high-level radioactive waste repository siting program of the US Department of Energy. In Rhode Island, that function is performed by a multidisciplinary Project Review Team consisting of staff from three State agencies. Members of the Review Team attended several meetings in 1985 to voice their concerns directly to DOE. Written comments were also submitted on draft plans and reports. Among the issues raised were inconsistencies in the geologic and environmental data used to screen potential repository sites, the role of Monitored Retrievable Storage (MRS) in the repository program, and regulations regarding the transportation and storage of nuclear waste. The Review Team also began work on a public information booklet describing the repository program in nontechnical terms. That booklet will be distributed widely upon completion

  5. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  6. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  7. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  8. A Flight Plan for the Community Media Act

    Directory of Open Access Journals (Sweden)

    Jesús Enrique Urbina Serjant

    2012-02-01

    Full Text Available In the design and implementation of public policy, planning usually plays a unique role. Government interventions generally follow a pattern conceived with forethought. In the case of President Hugo Chavez’ Administration (1999 to present, little has been left to chance in the most important impact on the communications sector: the legal regulation, control of broadcasters, the consolidation of public media and sponsorship of community media. As he has been radicalizing his Bolivarian political project, Chávez weaves forecasts consistent communication policy in the content of government plans. The draft Community Media Act is a good example of synchronicity between government actions and communications sector address of the "revolution". The popular initiative for submission of the Act was not spontaneous or its rules respond to genuine community interest.

  9. The Clean Air Act Amendments of 1990 - Implementation

    International Nuclear Information System (INIS)

    Radford, N.D. Jr.

    1991-01-01

    On November 15, 1991 the Clean Air Act Amendments of 1990 were signed into law. The Amendments include eleven titles. They are: Title I specifies the requirements for attainment and maintenance of the national ambient air quality standards; Title II provides for more stringent motor vehicle emission limits and cleaner vehicle fuels; Title III addresses the release of air toxics; Title IV creates an acid deposition control program; Title V imposes a new comprehensive operating permit system for stationary sources; Title VI provides for stratospheric ozone protection; Title VII imposes increased civil and criminal penalties and liability; Title VIII contains miscellaneous provisions. Title IX provides for air quality research projects; Title X directs the EPA to make ten percent of research funds available to disadvantaged businesses; and Title XI amends the Job Training Partnership Act

  10. The human genome project

    International Nuclear Information System (INIS)

    Worton, R.

    1996-01-01

    The Human Genome Project is a massive international research project, costing 3 to 5 billion dollars and expected to take 15 years, which will identify the all the genes in the human genome - i.e. the complete sequence of bases in human DNA. The prize will be the ability to identify genes causing or predisposing to disease, and in some cases the development of gene therapy, but this new knowledge will raise important ethical issues

  11. Rhode Island crystalline repository project: Technical progress report, 1984-1986

    International Nuclear Information System (INIS)

    1986-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provided financial support to the State of Rhode Island for its participation in the high-level radioactive waste repository siting program. In 1984, the Office of the Governor set up a multidisciplinary Project Review Team consisting of staff from three State agencies and the University of Rhode Island. Members of the Review Team attended several meetings throughout the reporting period to voice their concerns about siting directly to the US Department of Energy (DOE). Written comments were also submitted on draft plans and reports. Many of Rhode Island's recommendations in these comments were later adopted. In May, 1986, Secretary of Energy John Herrington announced the suspension of the crystalline repository siting program. The remainder of the year was spent monitoring litigation challenging that decision and pending legislation. Administrative phase-down of the program was essentially complete by the close of the calendar year

  12. 75 FR 55823 - Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO; Correction

    Science.gov (United States)

    2010-09-14

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Inventory Completion: Denver Museum of Nature & Science, Denver, CO; Correction AGENCY: National Park Service, Interior. ACTION: Notice; correction. Notice is here given in accordance with the Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. 3003, of the...

  13. Acceptance and commitment therapy (ACT) for clinically distressed health care workers: Waitlist-controlled evaluation of an ACT workshop in a routine practice setting.

    Science.gov (United States)

    Waters, Cerith S; Frude, Neil; Flaxman, Paul E; Boyd, Jane

    2018-03-01

    To examine the effects of a 1-day acceptance and commitment therapy (ACT) workshop on the mental health of clinically distressed health care employees, and to explore ACT's processes of change in a routine practice setting. A quasi-controlled design, with participants block allocated to an ACT intervention or waiting list control group based on self-referral date. Participants were 35 health care workers who had self-referred for the ACT workshop via a clinical support service for staff. Measures were completed by ACT and control group participants at pre-intervention and 3 months post-intervention. Participants allocated to the waitlist condition went on to receive the ACT intervention and were also assessed 3 months later. At 3 months post-intervention, participants in the ACT group reported a significantly lower level of psychological distress compared to the control group (d = 1.41). Across the 3-month evaluation period, clinically significant change was exhibited by 50% of ACT participants, compared to 0% in the control group. When the control group received the same ACT intervention, 69% went on to exhibit clinically significant change. The ACT intervention also resulted in significant improvements in psychological flexibility, defusion, and mindfulness skills, but did not significantly reduce the frequency of negative cognitions. Bootstrapped mediation analyses indicated that the reduction in distress in the ACT condition was primarily associated with an increase in mindfulness skills, especially observing and non-reactivity. These findings provide preliminary support for providing brief ACT interventions as part of routine clinical support services for distressed workers. A 1-day ACT workshop delivered in the context of a routine staff support service was effective for reducing psychological distress among health care workers. The brief nature of this group intervention means it may be particularly suitable for staff support and primary care mental

  14. Radiological environmental monitoring programs at Canadian nuclear facilities - a practical model for follow-up activities under the Canadian Environmental Assessment Act

    International Nuclear Information System (INIS)

    Tamm, J.A.; Zach, R.

    2000-01-01

    Under the Canadian Environmental Assessment Act (the Act), a federal authority, if it considers it appropriate, is to design a follow-up program for a project undergoing a federal environmental assessment and arrange for implementation of that program. Under the Act a follow-up program means a set of activities for verifying the accuracy of the environmental assessment (EA) of a project and for determining the effectiveness of any measures taken to mitigate any adverse environmental effects resulting from the project. The Act currently does not include regulations, guidelines, standards or procedures regarding the design, content and implementation requirements for follow-up programs (Canadian Environmental Assessment Agency [the Agency] 1999). Uncertainties also exist regarding the roles and responsibilities in designing, implementing, enforcing and auditing such activities. The Agency is presently specifying appropriate activities to address these issues. This paper considers the existing radiological environmental monitoring programs at nuclear facilities. Such programs consist of two types of monitoring-radioactivity releases from the facility via liquid and gaseous waste streams, and radioactivity in the environment at large, beyond the facility's immediate location. Such programs have been developed by AECL, Canadian nuclear utilities and uranium mining companies. Our analysis show that these programs can provide a good model for follow-up programs under the Act. (author)

  15. Identification of a gene expression profile that discriminates indirect-acting genotoxins from direct-acting genotoxins

    Energy Technology Data Exchange (ETDEWEB)

    Hu Ting; Gibson, David P.; Carr, Gregory J.; Torontali, Suzanne M.; Tiesman, Jay P.; Chaney, Joel G.; Aardema, Marilyn J

    2004-05-18

    During the safety evaluation process of new drugs and chemicals, a battery of genotoxicity tests is conducted starting with in vitro genotoxicity assays. Obtaining positive results in in vitro genotoxicity tests is not uncommon. Follow-up studies to determine the biological relevance of positive genotoxicity results are costly, time consuming, and utilize animals. More efficient methods, especially for identifying a putative mode of action like an indirect mechanism of genotoxicity (where DNA molecules are not the initial primary targets), would greatly improve the risk assessment for genotoxins. To this end, we are participating in an International Life Sciences Institute (ILSI) project involving studies of gene expression changes caused by model genotoxins. The purpose of the work is to evaluate gene expression tools in general, and specifically for discriminating genotoxins that are direct-acting from indirect-acting. Our lab has evaluated gene expression changes as well as micronuclei (MN) in L5178Y TK{sup +/-} mouse lymphoma cells treated with six compounds. Direct-acting genotoxins (where DNA is the initial primary target) that were evaluated included the DNA crosslinking agents, mitomycin C (MMC) and cisplatin (CIS), and an alkylating agent, methyl methanesulfonate (MMS). Indirect-acting genotoxins included hydroxyurea (HU), a ribonucleotide reductase inhibitor, taxol (TXL), a microtubule inhibitor, and etoposide (ETOP), a DNA topoisomerase II inhibitor. Microarray gene expression analysis was conducted using Affymetrix mouse oligonucleotide arrays on RNA samples derived from cells which were harvested immediately after the 4 h chemical treatment, and 20 h after the 4 h chemical treatment. The evaluation of these experimental results yields evidence of differentially regulated genes at both 4 and 24 h time points that appear to have discriminating power for direct versus indirect genotoxins, and therefore may serve as a fingerprint for classifying chemicals

  16. Can the New Antimonopoly Act Change the Japanese Business Community? : The 2005 Amendment to Antimonopoly Act and Corporate Compliance

    OpenAIRE

    Kazukiyo Onishi

    2008-01-01

    It has been reported in the media that bid rigging is commonly practised in almost all public works projects in Japan. It was also said that the Japanese anti-trust authority, the Japan Fair Trade Commission (JFTC), was a watchdog that did not bite, in spite of having a long history of enforcement since 1947. However, the situation is significantly changing because the Japanese Antimonopoly Act was amended in 2005 to greatly strengthen anti-trust enforcement. The JFTC has already succeeded in...

  17. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  18. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  19. Completion report for Well Cluster ER-20-6

    International Nuclear Information System (INIS)

    1998-02-01

    The Well Cluster ER-20-6 drilling and completion project was conducted during February, March, and April of 1996 in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS), Nye County, Nevada. This project is part of the DOE's Underground Test Area (UGTA) subproject at the NTS. The primary UGTA tasks include collecting geological, geophysical, and hydrological data from new and existing wells to define groundwater quality as well as pathways and rates of groundwater migration at the NTS. A program of drilling wells near the sites of selected underground nuclear tests (near-field drilling) was implemented as part of the UGTA subproject to obtain site-specific data on the nature and extent of migration of radionuclides produced by an underground nuclear explosion. The ER-20-6 near-field drilling project was originally planned to be very similar to that recently conducted at Well Cluster ER-20-5, which was designed to obtain data on the existing hydrologic regime near the site of an underground nuclear explosion (IT, 1995; IT, 1996a). However, after further consideration of the goals of the near-field drilling program and the characteristics of the BULLION site, the TWG recommended that the ER-20-6 project be redesigned to accommodate a forced-gradient experiment. This proposed experiment is expected to yield more realistic estimates of transport parameters than can be deduced from sampling and testing natural groundwater flow systems

  20. Completion report for Well Cluster ER-20-6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Well Cluster ER-20-6 drilling and completion project was conducted during February, March, and April of 1996 in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS), Nye County, Nevada. This project is part of the DOE`s Underground Test Area (UGTA) subproject at the NTS. The primary UGTA tasks include collecting geological, geophysical, and hydrological data from new and existing wells to define groundwater quality as well as pathways and rates of groundwater migration at the NTS. A program of drilling wells near the sites of selected underground nuclear tests (near-field drilling) was implemented as part of the UGTA subproject to obtain site-specific data on the nature and extent of migration of radionuclides produced by an underground nuclear explosion. The ER-20-6 near-field drilling project was originally planned to be very similar to that recently conducted at Well Cluster ER-20-5, which was designed to obtain data on the existing hydrologic regime near the site of an underground nuclear explosion (IT, 1995; IT, 1996a). However, after further consideration of the goals of the near-field drilling program and the characteristics of the BULLION site, the TWG recommended that the ER-20-6 project be redesigned to accommodate a forced-gradient experiment. This proposed experiment is expected to yield more realistic estimates of transport parameters than can be deduced from sampling and testing natural groundwater flow systems.

  1. Projecting national forest inventories for the 2000 RPA timber assessment.

    Science.gov (United States)

    John R. Mills; Xiaoping. Zhou

    2003-01-01

    National forest inventories were projected in a study that was part of the 2000 USDA Forest Service Resource Planning Act (RPA) timber assessment. This paper includes an overview of the status and structure of timber inventory of the National Forest System and presents 50-year projections under several scenarios. To examine a range of possible outcomes, results are...

  2. 76 FR 27342 - Central Utah Project Completion Act; Notice of Intent To Accept Proposals, Select a Potential...

    Science.gov (United States)

    2011-05-11

    ... Structure, and power purchasing and/or marketing considerations. Interested entities are invited to submit a...'s purchasing and/or marketing the power may also be obtained from Ms. Kyriss at the address above... this process, Western would either purchase and market the power as Salt Lake City Area--Integrated...

  3. Atomic Act amended

    International Nuclear Information System (INIS)

    Drabova, D.

    2002-01-01

    In the paper by the chairwoman of the Czech nuclear regulatory authority, the history of Czech nuclear legislation is outlined, the reasons for the amendment of the Atomic Act (Act No. 18/1997) are explained, and the amendments themselves are highlighted. The Act No. 13/2002 of 18 December 2001 is reproduced from the official Collection of Acts of the Czech Republic in the facsimile form. The following acts were thereby amended: Atomic Act No. 18/1997, Metrology Act No. 505/1990, Public Health Protection Act No. 258/2000, and Act No. 2/1969 on the Establishment of Ministries and Other Governmental Agencies of the Czech Republic. (P.A.)

  4. The Unsafe Acts and the Decision-to-Err Factors of Thai Construction Workers

    Directory of Open Access Journals (Sweden)

    Thanet Aksorn

    2007-06-01

    Full Text Available The unsafe acts of workers are considered as major contributors of work-related accidents and injuries on construction sites. However, not much work has been done to address the reasons why unsafe acts of workers occur particularly in construction industry. The aim of this paper therefore, is to investigate the major unsafe acts (i.e., at-risk behavior, and the decision-to-err factors causing unsafe acts. A questionnaire survey was conducted to collect data from a total of 214 workers from 20 building construction projects in Thailand. The findings revealed that the failure of workers to wear personal protective equipment (PPE, improper lifting or handling of materials, and keeping sharp objects in dangerous locations, are the major unsafe acts which frequently occur on construction sites in Thailand. In addition, the paper reported that the top three most frequent unsafe acts are statistically associated with several decision-to-err factors, including lack of management support, management pressure, group norms, overconfidence, being uncomfortable, past experience and laziness.

  5. 75 FR 63703 - Privacy Act of 1974; Privacy Act Regulation

    Science.gov (United States)

    2010-10-18

    ... FEDERAL RESERVE SYSTEM 12 CFR Part 261a [Docket No. R-1313] Privacy Act of 1974; Privacy Act... implementing the Privacy Act of 1974 (Privacy Act). The primary changes concern the waiver of copying fees... records under the Privacy Act; the amendment of special procedures for the release of medical records to...

  6. Privacy Act

    Science.gov (United States)

    Learn about the Privacy Act of 1974, the Electronic Government Act of 2002, the Federal Information Security Management Act, and other information about the Environmental Protection Agency maintains its records.

  7. 78 FR 55251 - Hydropower Regulatory Efficiency Act of 2013; Notice of Workshop

    Science.gov (United States)

    2013-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower... hydropower development at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the Hydropower Regulatory Efficiency Act of 2013. Participants should be prepared to discuss...

  8. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  9. Economic feasibility of hay enriched extruded production as a complete diet for equine

    Directory of Open Access Journals (Sweden)

    Kátia Feltre

    2016-04-01

    Full Text Available The present study aimed to evaluate the economic feasibility of production and commercialization project of Hay Enriched Extruded (HEE as a complete diet for horses. The study was based on survey data and quotation activities involving price from the land preparation (repair, planting and fertilization to the processing of the product at the factory (extrusion and marketing. Transportation costs and taxes were also considered. Discounted Cash Flow (30 years was used to calculate the profitability indicator and the Profit and Loss Statement (PLS. Calculations were developed using Microsoft Office Excel® spreadsheets. Three production scenarios were simulated with different consumer prices: Scenario 1 - equivalent to the complete diet, where the ingredients are supplied together, but purchased separately; Scenario 2 - Considering a value 10% higher than the complete diet; Scenario 3 - Considering a value 20% higher than the complete diet. We observed that the project was economically viable in the three suggested scenarios with positive Net Present Value, Internal Rate of Return greater than 9.4% and payback of 11 to 2 years. The results enable us to conclude that the product may be a promising investment for both product quality and ease of use as the rapid return on invested capital.

  10. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  11. Complete genome sequence of Nakamurella multipartita type strain (Y-104).

    Science.gov (United States)

    Tice, Hope; Mayilraj, Shanmugam; Sims, David; Lapidus, Alla; Nolan, Matt; Lucas, Susan; Glavina Del Rio, Tijana; Copeland, Alex; Cheng, Jan-Fang; Meincke, Linda; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavromatis, Konstantinos; Ovchinnikova, Galina; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jeffries, Cynthia D; Detter, John C; Brettin, Thomas; Rohde, Manfred; Göker, Markus; Bristow, Jim; Eisen, Jonathan A; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C; Klenk, Hans-Peter; Chen, Feng

    2010-03-30

    Nakamurella multipartita (Yoshimi et al. 1996) Tao et al. 2004 is the type species of the monospecific genus Nakamurella in the actinobacterial suborder Frankineae. The nonmotile, coccus-shaped strain was isolated from activated sludge acclimated with sugar-containing synthetic wastewater, and is capable of accumulating large amounts of polysaccharides in its cells. Here we describe the features of the organism, together with the complete genome sequence and annotation. This is the first complete genome sequence of a member of the family Nakamurellaceae. The 6,060,298 bp long single replicon genome with its 5415 protein-coding and 56 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  12. Decommissioning wind energy projects: An economic and political analysis

    International Nuclear Information System (INIS)

    Ferrell, Shannon L.; DeVuyst, Eric A.

    2013-01-01

    Wind energy is the fastest-growing segment of new electrical power capacity in the United States, with the potential for significant growth in the future. To facilitate such growth, a number of concerns between developers and landowners must be resolved, including assurance of wind turbine decommissioning at the end of their useful lives. Oklahoma legislators enlisted the authors to develop an economically-sound proposal to ensure developers complete their decommissioning obligations. Economic analysis of turbine decommissioning is complicated by a lack of operational experience, as few U.S. projects have been decommissioned. This leads to a lack of data regarding decommissioning costs. Politically, the negotiation leading to the finally-enacted solution juxtaposed economic theory against political pragmatism, leading to a different but hopefully sound solution. This article will provide background for the decommissioning issue, chronicle the development of the decommissioning component of the Oklahoma Wind Energy Act, and frame issues that remain for policymakers in regulating wind power development. - Highlights: ► Wind energy is the fastest-growing component of U.S. power generation. ► Decommissioning wind projects is policy concern for wind development. ► Little public information on wind turbine decommissioning costs exists. ► Oklahoma’s solution attempts to account for both costs and risks. ► Additional research is needed to create a more precise policy solution.

  13. Project for the completion of a probabilistic safety analysis of an industrial irradiation

    International Nuclear Information System (INIS)

    Ferro, R.; Troncoso, M.

    1995-01-01

    The probabilistic safety analysis is a very valuable instrument in safety studies of facilities with potential risk for the personnel, population and environment. One of the possible field of use of PSA techniques in the safety studies for industrial irradiation where serious accidents have occurred. For this reason a project has been undertaken to carry out the PSA in the Irradiation Plant of Research Institute of the Food Industry, which complements the safety studies of this facility

  14. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  15. Clinical trials transparency and the Trial and Experimental Studies Transparency (TEST) act.

    Science.gov (United States)

    Logvinov, Ilana

    2014-03-01

    Clinical trial research is the cornerstone for successful advancement of medicine that provides hope for millions of people in the future. Full transparency in clinical trials may allow independent investigators to evaluate study designs, perform additional analysis of data, and potentially eliminate duplicate studies. Current regulatory system and publishers rely on investigators and pharmaceutical industries for complete and accurate reporting of results from completed clinical trials. Legislation seems to be the only way to enforce mandatory disclosure of results. The Trial and Experimental Studies Transparency (TEST) Act of 2012 was introduced to the legislators in the United States to promote greater transparency in research industry. Public safety and advancement of science are the driving forces for the proposed policy change. The TEST Act may benefit the society and researchers; however, there are major concerns with participants' privacy and intellectual property protection. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. Honey Lake Geothermal Project, Lassen County, California

    Science.gov (United States)

    1984-11-01

    The drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel is reported. The project is located within the Wendel-Amedee Known Geothermal Resource Area.

  17. 31 CFR 500.413 - Participation in certain development projects in Vietnam.

    Science.gov (United States)

    2010-07-01

    .... However, had the ADB formally proposed the project in its monthly ADB Business Opportunities as a project... continued management and operation of the plants by the U.S. Company after completion, and for the insurance... is completed, Vietnam hires a U.S. marketing firm to develop marketing strategies for the product...

  18. Reporting bias in completed epilepsy intervention trials: A cross-sectional analysis.

    Science.gov (United States)

    Rayi, Appaji; Thompson, Stephanie; Gloss, David; Malhotra, Konark

    2018-03-30

    To explore the evidence of reporting bias among completed epilepsy intervention trials (EITs) and compliance of applicable EITs to Food and Drug Administration Amendments Act (FDAAA). We included consecutive EITs registered as completed on ClinicalTrials.gov from 2008 to 2015. Descriptive data was collected including study type, study phase, funding source, primary completion date, and result reporting date. Time to result reporting was analyzed using Kaplan-Meier estimates for two time periods (2008-2011 and 2012-2015). PubMed, Web of Science, and Google scholar databases were manually searched for publication details. Overall, 95/126 EITs (75%) reported, while remaining 31/126 (25%) did not report their results. Time to reporting was significantly lower for trials completed during 2012-2015 (16.5 months; 95% CI: 13.60-19.40; p = .002; Cohen's d = 0.68) as compared to the trials completed during 2008-2011 (25.9 months; 95% CI: 21.56-30.22). 72/126 trials were conducted in at least one U.S. center. 56/72 (78%) of the trials met the FDAAA criteria, while only 19/56 (34%) reported within the mandated one-year time frame. The lack of reporting of nearly one-quarter of completed epilepsy intervention trials suggests existence of reporting bias. As such, it should be considered an important criterion for determining risk of bias in epilepsy systematic reviews. Copyright © 2018 Elsevier B.V. All rights reserved.

  19. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  20. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...