  1. Financing innovative technologies in wind projects

    International Nuclear Information System (INIS)

    Vaughan, C.

    2006-01-01

    Methods of market entry and the financing of new technologies were discussed from the perspective of Clipper Windpower, a wind energy company based in the northeastern United States and Canada. Many new technology companies only consider private equity when seeking financing for new product development. However, financing for projects and products is only the first step to market entry. Wind projects are the financial equivalent of a high yield bond with mechanical risk. Many wind power projects with company equity can also be seen as a long term bond with upside in any given year. It is therefore important for wind developers to seek out strategic buyers for both product development and project development, in addition to finding sources of private equity. Clipper Windpower Inc. has developed a partnership with British Petroleum (BP), who hold an equity interest in the company. Both companies are now partnering on projects with Clipper turbines, and firm orders are in place for 2007 and 2008. As a result of the partnership, Clipper now has increased its financial strength in cash flows, balance sheets, and projected revenue. It was concluded that a successful partnership can increase the scale of wind power development, and bring financial sophistication to smaller companies with limited resources. refs., tabs., figs

  2. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  3. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  4. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  5. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  6. The shift in windpower

    International Nuclear Information System (INIS)

    Gipe, P.

    1992-01-01

    Despite new production records, the near-term market for new windpower projects in the US remains bleak. Congressional incentives and project proposals in the mid-1990s offer promise, but for now most development has shifted to Europe. During 1992 and 1993 the largest wind projects developed by US companies will not be in the US, but in the United Kingdom and Spain. Indeed, most of the US's windpower industry is going abroad, establishing offices overseas. This move toward Europe comes as little surprise. New project development for US firms has faltered at home while the European market has burgeoned. The topics of the article include the move to Europe, a reduction in California's share of producing wind power plants, a rise in Europe's share of producing wind power plants, the future market for wind power in the US, and reawakening California's market

  7. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  8. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  9. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  10. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  11. Code of Conduct for wind-power projects - Feasibility study; Code of Conduct fuer windkraftprojekte. Machbarkeitsstudie - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2009-02-15

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  12. Reasons for decision in the matter of Enbridge Pipelines Inc. Alberta Clipper expansion project : facilities and tolls and tariffs

    International Nuclear Information System (INIS)

    2008-01-01

    In May 2007, Enbridge Pipelines Inc. applied for approval to construct the Alberta Clipper Expansion Project which consists of 1074 km of oil pipeline and associated facilities between its Hardisty, Alberta terminal and the Canada/United States border near Gretna, Manitoba. The purpose of the project is to increase the takeaway capacity out of the Western Canada Sedimentary Basin (WCSB) and into PADD 2 and eastern Canadian markets. The pipeline would have an initial capacity of 71,500 cubic metres per day. The estimated cost of the project is $2 billion with a targeted in-service data for July 2010. Public hearings into the Alberta Clipper project began in November 2007 and included an oral hearing. The Board was presented with evidence from intervenors on many issues including impacts to Aboriginal peoples and the impact of the project on domestic interests. The Board reviewed the design and operation of the proposed facilities as well as routing and land requirements. Issues regarding the environment, socio-economic matters, tolls, tariffs and economics were also addressed. The Board was satisfied from the evidence that the proposed facilities are, and will be, required by the present and future public convenience and necessity. In approving the project, the Board attached several conditions, including one that requires Enbridge to conduct an emergency response exercise at its South Saskatchewan River crossing. This condition is in response to public concerns raised during the hearing process. 11 refs., 6 tabs., 5 figs., 4 appendices

  13. Diagnostic criteria for chronic lymphocytic inflammation with pontine perivascular enhancement responsive to steroids (CLIPPERS).

    Science.gov (United States)

    Tobin, W Oliver; Guo, Yong; Krecke, Karl N; Parisi, Joseph E; Lucchinetti, Claudia F; Pittock, Sean J; Mandrekar, Jay; Dubey, Divyanshu; Debruyne, Jan; Keegan, B Mark

    2017-09-01

    Chronic lymphocytic inflammation with pontine perivascular enhancement responsive to steroids (CLIPPERS) is a central nervous system inflammatory syndrome predominantly affecting the brainstem, cerebellum, and spinal cord. Following its initial description, the salient features of CLIPPERS have been confirmed and expanded upon, but the lack of formalized diagnostic criteria has led to reports of patients with dissimilar features purported to have CLIPPERS. We evaluated clinical, radiological and pathological features of patients referred for suspected CLIPPERS and propose diagnostic criteria to discriminate CLIPPERS from non-CLIPPERS aetiologies. Thirty-five patients were evaluated for suspected CLIPPERS. Clinical and neuroimaging data were reviewed by three neurologists to confirm CLIPPERS by consensus agreement. Neuroimaging and neuropathology were reviewed by experienced neuroradiologists and neuropathologists, respectively, both of whom were blinded to the clinical data. CLIPPERS was diagnosed in 23 patients (18 male and five female) and 12 patients had a non-CLIPPERS diagnosis. CLIPPERS patients' median age of onset was 58 years (interquartile range, 24-72) and were followed a median of 44 months (interquartile range 38-63). Non-CLIPPERS patients' median age of onset was 52 years (interquartile range, 39-59) and were followed a median of 27 months (interquartile range, 14-47). Clinical symptoms of gait ataxia, diplopia, cognitive impairment, and facial paraesthesia did not discriminate CLIPPERS from non-CLIPPERS. Marked clinical and radiological corticosteroid responsiveness was observed in CLIPPERS (23/23), and clinical worsening occurred in all 12 CLIPPERS cases when corticosteroids were discontinued. Corticosteroid responsiveness was common but not universal in non-CLIPPERS [clinical improvement (8/12); radiological improvement (2/12); clinical worsening on discontinuation (3/8)]. CLIPPERS patients had brainstem predominant perivascular gadolinium enhancing

  14. Windpower project ownership and financing: The cost impacts of alternative development structures

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H. [Lawrence Berkeley National Lab., CA (United States)

    1997-12-31

    This paper uses traditional financial cash-flow techniques to examine the impact of different ownership and financing structures on the cost of wind energy. While most large-scale wind projects are constructed, operated, and financed by non-utility generators (NUGs) via project financing, investor- and publicly-owned utilities have expressed interest in owning and financing their own facilities rather than purchasing wind energy from independent generators. A primary justification for utility ownership is that, because of financing and tax benefits, windpower may be cheaper when developed in this fashion. The results presented in this paper support that justification, though some of the estimated cost savings associated with utility ownership are found to be a result of shortcomings in utility analysis procedures and implicit risk shifting. This paper also discusses the comparative value of the federal production tax credit and renewable energy production incentive; estimates the financing premium paid by NUG wind owners compared to traditional gas-fired generation facilities; and explores the impact of electricity restructuring on financing.

  15. FEATURES AND PROSPECTS FOR USE OF WIND-POWERED DRIVE ON AGRICULTURAL AIRPLANE

    Directory of Open Access Journals (Sweden)

    2016-01-01

    Full Text Available The article deals with the wind-powered drive location and functioning pecularities of agricultural airplane special equipment. The data on the advantages and prospects of the use of the wind-powered drive on agricultural aircraft as well as the experimental and analytical data on discontinuity of the wind stream in the zone of the wind-powered drive installa- and parameters of its operation at aerial spraying on the example of specially equipped An-2 are presented. A mathe- matical model of a wind propeller in discontinuous wind stream is developed. Software package to comprehensively assess wind-powered drive conditions and performance indicators is generated and tested taking into account experimental data, as well as airplane performance and flight modes. The typical data on the wind propeller and the wind-powered drive in the spraying process are received; specific features of the dynamics at the wind-powered drive turning-on and the wind propel- ler rotation at zero load are determined and the data on the wind-propeller blades load imbalance at spraying and transient processes are defined. The author made a quantitative estimation of how the standard change of flight parameters and the operation of the aircraft power plant at spraying influence on the factors of wind-powered drive operation and working liq- uids suppey. The main tendencies, qualitative and quantitative aspects of a wind-powered drive use are defined when per- forming aerial works and the proposals and recommendations for improving and using it in the future are made. The find- ings of the work can be used in the wind-powered drive of agricultural airplane special equipment designing and moderni- zation and drilling of the operational and technological procedures of aerial works performance in agriculture and forestry.

  16. Meeting the challenge of expanding windpower education to keep up with growth

    Energy Technology Data Exchange (ETDEWEB)

    Piva, S. [Gotland Univ., Visby (Sweden)]|[National Technological Univ. (Argentina)

    2008-07-01

    There are 160 wind turbines in operation on the Island of Gotland in the Baltic Sea. The wind turbines connected online have a wind penetration of 20 per cent of the annual electricity production, one of the highest rates in the world. Gotland University, which specializes in e-learning and distance courses, has the broadest education on windpower in Sweden. It has offered courses on wind power since 1998, both on campus and by correspondence. This paper described the regular distance university courses in windpower technology offered by Gotland University. These included distance windpower university courses at the ordinary university level course; distance-cum-contact courses specially arranged for teachers; windpower introduction courses, open to all without formal requirements; and international training programs offered on campus. The first windpower distance course in English started in 2004. Participants from around the world have taken these courses. These open, free of charge, distance courses can initiate a much needed windpower chain reaction to train teachers in the industry. The teaching system was analyzed in this paper with particular reference to describing characteristics, evolution and prospectives. The purpose of this paper was to encourage readers, teachers and educational institutions to take part in the education methodology and to participate in this international network. The first windpower distance course in English started in 2004. Participants from around the world have taken these courses. 6 refs., 1 tab., 2 figs.

  17. STUDY OF INFLUENCE OF WIND-POWER STATIONS ON BIRDS: ANALYSIS OF INTERNATIONAL PRACTICES

    Directory of Open Access Journals (Sweden)

    Gorlov P. I.

    2012-06-01

    Full Text Available The world experience of bird collisions with wind-power stations was analyzed. The detailcharacteristics of principal threats to the birds during building and exploitation of wind-power stations was done. Comparative analysis of factors caused annual birds mortality was performed. Some proposals of negative influence minimization were suggested for wind-power stations utilization.

  18. The Europa Clipper Mission Concept

    Science.gov (United States)

    Pappalardo, Robert; Goldstein, Barry; Magner, Thomas; Prockter, Louise; Senske, David; Paczkowski, Brian; Cooke, Brian; Vance, Steve; Wes Patterson, G.; Craft, Kate

    2014-05-01

    A NASA-appointed Science Definition Team (SDT), working closely with a technical team from the Jet Propulsion Laboratory (JPL) and the Applied Physics Laboratory (APL), recently considered options for a future strategic mission to Europa, with the stated science goal: Explore Europa to investigate its habitability. The group considered several mission options, which were fully technically developed, then costed and reviewed by technical review boards and planetary science community groups. There was strong convergence on a favored architecture consisting of a spacecraft in Jupiter orbit making many close flybys of Europa, concentrating on remote sensing to explore the moon. Innovative mission design would use gravitational perturbations of the spacecraft trajectory to permit flybys at a wide variety of latitudes and longitudes, enabling globally distributed regional coverage of the moon's surface, with nominally 45 close flybys at altitudes from 25 to 100 km. We will present the science and reconnaissance goals and objectives, a mission design overview, and the notional spacecraft for this concept, which has become known as the Europa Clipper. The Europa Clipper concept provides a cost-efficient means to explore Europa and investigate its habitability, through understanding the satellite's ice and ocean, composition, and geology. The set of investigations derived from the Europa Clipper science objectives traces to a notional payload for science, consisting of: Ice Penetrating Radar (for sounding of ice-water interfaces within and beneath the ice shell), Topographical Imager (for stereo imaging of the surface), ShortWave Infrared Spectrometer (for surface composition), Neutral Mass Spectrometer (for atmospheric composition), Magnetometer and Langmuir Probes (for inferring the satellite's induction field to characterize an ocean), and Gravity Science (to confirm an ocean).The mission would also include the capability to perform reconnaissance for a future lander

  19. Estimation of wake propagation behind the rotors of wind-powered generators

    DEFF Research Database (Denmark)

    Naumov, I. V.; Mikkelsen, Robert Flemming; Okulov, Valery

    2016-01-01

    . It is shown that the recovery of velocity of incident flow is faster than has been previously defined in the models of calculating the impact of wind electric power plants on the regional climate changes. Thus, existing wind loss calculated on the model of wake behind the wind-powered generator, adjusted......The objectives of this work are to develop the experimental model of wake behind the wind-power generator rotor to estimate its propagation distance and the impact on the average and pulsation characteristics of incident flow with the possibility of further use of these data in the calculation...... models of wind and climate changes in the regions and to determine the optimal operation of wind turbines. For experimental modeling, the laboratory model of wind-powered generator with a horizontal axis was used that operated as wind turbine in optimal mode. The kinematic characteristics of flow...

  20. Correlated wind-power production and electric load scenarios for investment decisions

    International Nuclear Information System (INIS)

    Baringo, L.; Conejo, A.J.

    2013-01-01

    Highlights: ► Investment models require an accurate representation of the involved uncertainty. ► Demand and wind power production are correlated and uncertain parameters. ► Two methodologies are provided to represent uncertainty and correlation. ► An accurate uncertainty representation is crucial to get optimal results. -- Abstract: Stochastic programming constitutes a useful tool to address investment problems. This technique represents uncertain input data using a set of scenarios, which should accurately describe the involved uncertainty. In this paper, we propose two alternative methodologies to efficiently generate electric load and wind-power production scenarios, which are used as input data for investment problems. The two proposed methodologies are based on the load- and wind-duration curves and on the K-means clustering technique, and allow representing the uncertainty of and the correlation between electric load and wind-power production. A case study pertaining to wind-power investment is used to show the interest of the proposed methodologies and to illustrate how the selection of scenarios has a significant impact on investment decisions.

  1. Performance of wind-powered soil electroremediation process for the removal of 2,4-D from soil.

    Science.gov (United States)

    Souza, F L; Llanos, J; Sáez, C; Lanza, M R V; Rodrigo, M A; Cañizares, P

    2016-04-15

    In this work, it is studied a wind-powered electrokinetic soil flushing process for the removal of pesticides from soil. This approach aims to develop an eco-friendly electrochemical soil treatment technique and to face the in-situ treatment of polluted soils at remote locations. Herbicide 2,4 dichlorophenoxyacetic acid (2,4-D) is selected as a model pollutant for the soil treatment tests. The performance of the wind-powered process throughout a 15 days experiment is compared to the same remediation process powered by a conventional DC power supply. The wind-powered test covered many different wind conditions (from calm to near gale), being performed 20.7% under calm conditions and 17% under moderate or gentle breeze. According to the results obtained, the wind-powered soil treatment is feasible, obtaining a 53.9% removal of 2,4-D after 15 days treatment. Nevertheless, the remediation is more efficient if it is fed by a constant electric input (conventional DC power supply), reaching a 90.2% removal of 2,4-D with a much lower amount of charge supplied (49.2 A h kg(-1) and 4.33 A h kg(-1) for wind-powered and conventional) within the same operation time. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Spatial Distribution of Estimated Wind-Power Royalties in West Texas

    Directory of Open Access Journals (Sweden)

    Christian Brannstrom

    2015-12-01

    Full Text Available Wind-power development in the U.S. occurs primarily on private land, producing royalties for landowners through private contracts with wind-farm operators. Texas, the U.S. leader in wind-power production with well-documented support for wind power, has virtually all of its ~12 GW of wind capacity sited on private lands. Determining the spatial distribution of royalty payments from wind energy is a crucial first step to understanding how renewable power may alter land-based livelihoods of some landowners, and, as a result, possibly encourage land-use changes. We located ~1700 wind turbines (~2.7 GW on 241 landholdings in Nolan and Taylor counties, Texas, a major wind-development region. We estimated total royalties to be ~$11.5 million per year, with mean annual royalty received per landowner per year of $47,879 but with significant differences among quintiles and between two sub-regions. Unequal distribution of royalties results from land-tenure patterns established before wind-power development because of a “property advantage,” defined as the pre-existing land-tenure patterns that benefit the fraction of rural landowners who receive wind turbines. A “royalty paradox” describes the observation that royalties flow to a small fraction of landowners even though support for wind power exceeds 70 percent.

  3. CLIPPERS among patients diagnosed with non-specific CNS neuroinflammatory diseases

    DEFF Research Database (Denmark)

    Kerrn-Jespersen, B M; Lindelof, M; Illes, Zsolt

    2014-01-01

    Chronic Lymphocytic Inflammation with Pontine Perivascular Enhancement Responsive to Steroids (CLIPPERS) is an inflammatory CNS disorder characterized by 1) subacute onset of cerebellar and brainstem symptoms, 2) peripontine contrast-enhancing perivascular lesions with a "salt-and-pepper" appeara...

  4. Computer model for large-scale offshore wind-power systems

    Energy Technology Data Exchange (ETDEWEB)

    Dambolena, I G [Bucknell Univ., Lewisburg, PA; Rikkers, R F; Kaminsky, F C

    1977-01-01

    A computer-based planning model has been developed to evaluate the cost and simulate the performance of offshore wind-power systems. In these systems, the electricity produced by wind generators either satisfies directly demand or produces hydrogen by water electrolysis. The hydrogen is stored and later used to produce electricity in fuel cells. Using as inputs basic characteristics of the system and historical or computer-generated time series for wind speed and electricity demand, the model simulates system performance over time. A history of the energy produced and the discounted annual cost of the system are used to evaluate alternatives. The output also contains information which is useful in pointing towards more favorable design alternatives. Use of the model to analyze a specific wind-power system for New England indicates that electric energy could perhaps be generated at a competitive cost.

  5. Omics-based approach reveals complement-mediated inflammation in chronic lymphocytic inflammation with pontine perivascular enhancement responsive to steroids (CLIPPERS)

    DEFF Research Database (Denmark)

    Blaabjerg, Morten; Hemdrup, Anne Louise; Drici, Lylia

    2018-01-01

    by immunohistochemistry (IHC) on CLIPPERS brain samples (n = 3) and by ELISA in the CSF. For potential biomarkers, we used biomarker arrays, and compared inflammatory and vessel-associated proteins in the CSF of CLIPPERS (n = 5) with another inflammatory relapsing CNS disease, multiple sclerosis (RMS, n = 9) and healthy...... subjects (HS, n = 7). Results: Two hundred and seven proteins in the CSF discriminated CLIPPERS from AD. The complement cascade, immunoglobulins, and matrix proteins were among the most frequently represented pathways. Pathway analysis of upstream regulators suggested the importance of vascular cell...

  6. Study on development system of increasing gearbox for high-performance wind-power generator

    Science.gov (United States)

    Xu, Hongbin; Yan, Kejun; Zhao, Junyu

    2005-12-01

    Based on the analysis of the development potentiality of wind-power generator and domestic manufacture of its key parts in China, an independent development system of the Increasing Gearbox for High-performance Wind-power Generator (IGHPWG) was introduced. The main elements of the system were studied, including the procedure design, design analysis system, manufacturing technology and detecting system, and the relative important technologies were analyzed such as mixed optimal joint transmission structure of the first planetary drive with two grade parallel axle drive based on equal strength, tooth root round cutting technology before milling hard tooth surface, high-precise tooth grinding technology, heat treatment optimal technology and complex surface technique, and rig test and detection technique of IGHPWG. The development conception was advanced the data share and quality assurance system through all the elements of the development system. The increasing Gearboxes for 600KW and 1MW Wind-power Generator have been successfully developed through the application of the development system.

  7. Clipper circuit of pulse modulator used for klystron-5045 power supply

    CERN Document Server

    Akimov, A V

    2001-01-01

    While the operation of modulator to the pulsed transformer of klystron-5045, current through the primary winding of the pulse transformer (PT) continues to flow even upon the end of the klystron voltage operating pulse. This is determined by an energy stored in magnetizing inductance. The prolongation of magnetizing current passing process simultaneously with the premature choking of thyratron can cause high voltage of inverse polarity at the klystron, which cause the destruction of the cathode. We have considered the possibility of shortening time of magnetizing current passage for the charge of reasonable choice of clipper circuit parameters. The behavior of clipper circuit was studied in modulators used for the VEPP-5 (BINP, Russia) preinjector klystron power supply. The optimum operation run of the circuit was selected and its design features are described.

  8. Omics-Based Approach Reveals Complement-Mediated Inflammation in Chronic Lymphocytic Inflammation With Pontine Perivascular Enhancement Responsive to Steroids (CLIPPERS

    Directory of Open Access Journals (Sweden)

    Morten Blaabjerg

    2018-04-01

    Full Text Available ObjectiveChronic lymphocytic inflammation with pontine perivascular enhancement responsive to steroids (CLIPPERS is a rare syndrome with relapsing brainstem/cerebellar symptoms. To examine the pathogenic processes and investigate potential biomarkers, we analyzed combined materials of brain and cerebrospinal fluid (CSF by comprehensive methodologies.Materials and methodsTo identify major pathways of perivascular inflammation in CLIPPERS, we first compared the CSF proteome (n = 5 to a neurodegenerative condition, Alzheimer’s disease (AD, n = 5. Activation of complement was confirmed by immunohistochemistry (IHC on CLIPPERS brain samples (n = 3 and by ELISA in the CSF. For potential biomarkers, we used biomarker arrays, and compared inflammatory and vessel-associated proteins in the CSF of CLIPPERS (n = 5 with another inflammatory relapsing CNS disease, multiple sclerosis (RMS, n = 9 and healthy subjects (HS, n = 7.ResultsTwo hundred and seven proteins in the CSF discriminated CLIPPERS from AD. The complement cascade, immunoglobulins, and matrix proteins were among the most frequently represented pathways. Pathway analysis of upstream regulators suggested the importance of vascular cell adhesion protein 1 (VCAM1, IFN-γ, interleukin (IL-1, and IL-10. Differential regulation of more than 10 complement proteins of the 3 complement pathways in the CSF pointed to the role of complement activation. IHC on brain samples confirmed the perivascular complement activation, i.e., deposition of C3bc, C3d, and the terminal C5b-9 complement complex that partially overlapped with accumulation of IgG in the vessel wall. Besides endothelial cell damage, reactivity to smooth muscle actin was lost in the walls of inflamed vessels, but the glia limitans was preserved. The semi-quantitative array indicated that increased level of IL-8/CXCL8 (p < 0.05, eotaxin/CCL11 (p < 0.01, and granulocyte colony-stimulating factor (p < 0.05 in

  9. Mortality of radio collared willow ptarmigan in Smoela wind-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, Hans Chr.; Broeseth, Henrik; Nilsen, Erlend B.; Sandercock, Brett K.; Bevanger, Kjetil

    2011-07-01

    Full text: In the project Pre- and post-construction studies of conflicts between birds and wind turbines in coastal Norway (BirdWind), Smoela willow ptarmigan (Lagopus lagopus variegatus) has been one of the species studied. This sub-species represent gallinaceous birds, known to be bad flyers susceptible to collide with artificial structures, e.g. power lines. However, the possible impact of a wind-power plant on survival and behaviour in a willow ptarmigan population was unknown. The objectives of the study were therefore rather wide; to study direct and indirect effects of wind turbines on willow ptarmigan behaviour, habitat selection, reproduction and survival in areas where wind-power plants are established. To collect data on habitat selection, movements, collision risks, avoidance behaviour, survival and general population dynamic parameters, willow ptarmigan were radio-tagged in 2008-2010, using traditional VHF-transmitters (Holohill) with mortality switch, necklace mount, 12 g, lasting for approximately 24 months. Due to low population density and only occasional snow cover, a method using strong lights, dipnet and car was used to catch birds. In total, 34 willow ptarmigan were caught (19 males and 15 females). All birds were caught inside the wind-power plant area (WPA). The birds were radio-tracked at irregular intervals and almost all birds, when found, was located within the WPA. All carcasses of dead birds were examined. When possible, cause of death was determined as; predation (raptor), collision, unknown, other. In total, 28 of the radio-tagged birds have died since January 2008. A Kaplan-Meier analysis of cumulative survival rates, show an exceptionally low survival (<30%). Unlike other willow ptarmigan populations most of the mortality takes place during winter, from December throughout March. Although a thorough analysis of mortality causes has yet not been carried out, a majority of the birds have probably been killed by avian predators and to

  10. A nonlinear dynamics approach for incorporating wind-speed patterns into wind-power project evaluation.

    Science.gov (United States)

    Huffaker, Ray; Bittelli, Marco

    2015-01-01

    Wind-energy production may be expanded beyond regions with high-average wind speeds (such as the Midwest U.S.A.) to sites with lower-average speeds (such as the Southeast U.S.A.) by locating favorable regional matches between natural wind-speed and energy-demand patterns. A critical component of wind-power evaluation is to incorporate wind-speed dynamics reflecting documented diurnal and seasonal behavioral patterns. Conventional probabilistic approaches remove patterns from wind-speed data. These patterns must be restored synthetically before they can be matched with energy-demand patterns. How to accurately restore wind-speed patterns is a vexing problem spurring an expanding line of papers. We propose a paradigm shift in wind power evaluation that employs signal-detection and nonlinear-dynamics techniques to empirically diagnose whether synthetic pattern restoration can be avoided altogether. If the complex behavior of observed wind-speed records is due to nonlinear, low-dimensional, and deterministic system dynamics, then nonlinear dynamics techniques can reconstruct wind-speed dynamics from observed wind-speed data without recourse to conventional probabilistic approaches. In the first study of its kind, we test a nonlinear dynamics approach in an application to Sugarland Wind-the first utility-scale wind project proposed in Florida, USA. We find empirical evidence of a low-dimensional and nonlinear wind-speed attractor characterized by strong temporal patterns that match up well with regular daily and seasonal electricity demand patterns.

  11. Ten Years of Boundary-Layer and Wind-Power Meteorology at Høvsøre, Denmark

    DEFF Research Database (Denmark)

    Pena Diaz, Alfredo; Floors, Rogier Ralph; Sathe, Ameya

    2016-01-01

    Operational since 2004, the National Centre for Wind Turbines at Høvsøre, Denmark has become a reference research site for wind-power meteorology. In this study, we review the site, its instrumentation, observations, and main research programs. The programs comprise activities on, inter alia......, remote sensing, where measurements from lidars have been compared extensively with those from traditional instrumentation on masts. In addition, with regard to wind-power meteorology, wind-resource methodologies for wind climate extrapolation have been evaluated and improved. Further, special attention...

  12. Exploring Europa's Habitability: Science achieved from the Europa Orbiter and Clipper Mission Concepts

    Science.gov (United States)

    Senske, D. A.; Prockter, L. M.; Pappalardo, R. T.; Patterson, G. W.; Vance, S.

    2012-12-01

    Europa is a prime candidate in the search for present-day habitable environments in our solar system. Europa is unique among the large icy satellites because it probably has a saltwater ocean today beneath an ice shell that is geodynamically active. The combination of irradiation of its surface and tidal heating of its interior could make Europa a rich source of chemical energy for life. Perhaps most importantly, Europa's ocean is believed to be in direct contact with its rocky mantle, where conditions could be similar to those on Earth's biologically rich sea floor. Hydrothermal zones on Earth's seafloor are known to be rich with life, powered by energy and nutrients that result from reactions between the seawater and the warm rocky ocean floor. Life as we know it depends on three principal "ingredients": 1) a sustained liquid water environment; 2) essential chemical elements that are critical for building life; and 3) a source of energy that could be utilized by life. Europa's habitability requires understanding whether it possesses these three ingredients. NASA has enlisted a study team to consider Europa mission options feasible over the next decade, compatible with NASA's projected planetary science budget and addressing Planetary Decadal Survey priorities. Two Europa mission concepts (Orbiter and multiple flyby—call the "Clipper") are undergoing continued study with the goal to "Explore Europa to investigate its habitability." Each mission would address this goal in complementary ways, with high science value of its own. The Orbiter and Clipper architectures lend themselves to specific types of scientific measurements. The Orbiter concept is tailored to the unique geophysical science that requires being in orbit at Europa. This includes confirming the existence of an ocean and characterizing that ocean through geophysical measurements of Europa's gravitational tides and magnetic induction response. It also includes mapping of the global morphology and

  13. Wind-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Kling, A

    1976-08-26

    The invention is concerned with a wind-power plant whose rotor axis is pivoted in the supporting structure and swingable around an axis of tilt, forming an angle with the rotor axis and the vertical axis, and allowing precession of the rotor. On changes of wind direction an electric positioning device is moving the rotor axis into the new direction in such a way that no precession forces are exerted on the supporting structure and this one may very easily be held. Instead of one rotor, also a type with two coaxial, co-planar countercurrent rotors may be used. Each of the two countercurrent rotors is carrying a number of magnetic poles, distributed all over the circumference, acting together with the magnetic poles of the other rotor. At least the poles of one rotor have electric line windings being connected by leads with a collector so that the two rotors form the two parts of a power generator being each rotatable with respect to the other ('stator' and 'rotor').

  14. Phasing in wind-power in Norway: Network congestion and crowding-out of hydropower

    International Nuclear Information System (INIS)

    Forsund, Finn R.; Singh, Balbir; Jensen, Trond; Larsen, Cato

    2008-01-01

    The objective of this paper is to investigate the effects on utilisation of existing hydropower in a region of investing in significant wind-power in the region within the present network. Policy simulations are conducted using a dynamic system-wide model that is calibrated to reflect the structure of the Nordic power market. This model is the one used by the Norwegian electricity regulator and large hydropower companies in Norway for scheduling of hydro and market analyses. Simulations are carried out for different inflow situations based on past observations going back 60 years. Introduction of wind-power leads to significant increase in network congestion in the region, lower hydropower production, higher level of storage, increased spillage of water, and considerably lower price level in the local region in question

  15. Science and Reconnaissance from the Europa Clipper Mission Concept: Exploring Europa's Habitability

    Science.gov (United States)

    Pappalardo, Robert; Senske, David; Prockter, Louise; Paczkowski, Brian; Vance, Steve; Goldstein, Barry; Magner, Thomas; Cooke, Brian

    2015-04-01

    Europa is recognized by the Planetary Science De-cadal Survey as a prime candidate to search for a pre-sent-day habitable environment in our solar system. As such, NASA has pursued a series of studies, facilitated by a Europa Science Definition Team (SDT), to define a strategy to best advance our scientific understanding of this icy world with the science goal: Explore Europa to investigate its habitability. (In June of 2014, the SDT completed its task of identifying the overarching science objectives and investigations.) Working in concert with a technical team, a set of mission archi-tectures were evaluated to determine the best way to achieve the SDT defined science objectives. The fa-vored architecture would consist of a spacecraft in Ju-piter orbit making many close flybys of Europa, con-centrating on remote sensing to explore the moon. In-novative mission design would use gravitational per-turbations of the spacecraft trajectory to permit flybys at a wide variety of latitudes and longitudes, enabling globally distributed regional coverage of Europa's sur-face, with nominally 45 close flybys, typically at alti-tudes from 25 to 100 km. This concept has become known as the Europa Clipper. The Europa SDT recommended three science ob-jectives for the Europa Clipper: Ice Shell and Ocean: Characterize the ice shell and any subsurface water, including their heterogeneity, ocean properties, and the nature of surface-ice-ocean exchange; Composition: Understand the habitability of Europa's ocean through composition and chemistry; and Geology: Understand the formation of surface features, including sites of recent or current activity, and characterize high science interest localities. The Europa SDT also considered implications of the Hubble Space Telescope detection of possible plumes at Europa. To feed forward to potential subsequent future ex-ploration that could be enabled by a lander, it was deemed that the Europa Clipper mission concept should provide the

  16. Application of CLIPPER in the design of radiation history card for a radiation worker

    International Nuclear Information System (INIS)

    Datta, D.; Pendharkar, K.A.; Krishnamony, S.

    1994-01-01

    Radiation history card for the plant workers has been designed based on a PC software. The software is developed using CLIPPER language and is menu driven. The card gives instant information about the radiation data of an occupational worker useful for effective exposure control. (author). 1 tab

  17. The Plasma Instrument for Magnetic Sounding (PIMS) onboard the Europa Clipper Mission

    Science.gov (United States)

    Westlake, Joseph H.; McNutt, Ralph L.; Kasper, Justin C.; Rymer, Abigail; Case, Anthony; Battista, Corina; Cochrane, Corey; Coren, David; Crew, Alexander; Grey, Matthew; Jia, Xianzhe; Khurana, Krishan; Kim, Cindy; Kivelson, Margaret G.; Korth, Haje; Krupp, Norbert; Paty, Carol; Roussos, Elias; Stevens, Michael; Slavin, James A.; Smith, Howard T.; Saur, Joachim

    2017-10-01

    Europa is embedded in a complex Jovian magnetospheric plasma, which rotates with the tilted planetary field and interacts dynamically with Europa’s ionosphere affecting the magnetic induction signal. Plasma from Io’s temporally varying torus diffuses outward and mixes with the charged particles in Europa’s own torus producing highly variable plasma conditions. Onboard the Europa Clipper spacecraft the Plasma Instrument for Magnetic Sounding (PIMS) works in conjunction with the Interior Characterization of Europa using Magnetometry (ICEMAG) investigation to probe Europa’s subsurface ocean. This investigation exploits currents induced in Europa’s interior by the moon’s exposure to variable magnetic fields in the Jovian system to infer properties of Europa’s subsurface ocean such as its depth, thickness, and conductivity. This technique was successfully applied to Galileo observations and demonstrated that Europa indeed has a subsurface ocean. While these Galileo observations contributed to the renewed interest in Europa, due to limitations in the observations the results raised major questions that remain unanswered. PIMS will greatly refine our understanding of Europa’s global liquid ocean by accounting for contributions to the magnetic field from plasma currents.The Europa Clipper mission is equipped with a sophisticated suite of 9 instruments to study Europa's interior and ocean, geology, chemistry, and habitability from a Jupiter orbiting spacecraft. PIMS on Europa Clipper is a Faraday Cup based plasma instrument whose heritage dates back to the Voyager spacecraft. PIMS will measure the plasma that populates Jupiter’s magnetosphere and Europa’s ionosphere. The science goals of PIMS are to: 1) estimate the ocean salinity and thickness by determining Europa’s magnetic induction response, corrected for plasma contributions; 2) assess mechanisms responsible for weathering and releasing material from Europa’s surface into the atmosphere and

  18. Test location Guetsch, Switzerland for wind-power installations; Teststandort fuer Windkraftanlagen Guetsch. Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Schaffner, B.; Cattin, R.; Schilter, Ch.

    2007-07-15

    This illustrated technical report for the Swiss Federal Office of Energy (SFOE) describes work done on the preliminary project for providing test facilities for wind-power installations on the 'Guetsch' location in the Swiss Alps. In the context of the Alpine Test Site Guetsch project, which involves meteorological measurements and wind turbine performance analysis research, a comprehensive infrastructure for the acquisition of climate data and the performance of wind turbines has been defined. This work is to be carried out by the Swiss Federal Office of Meteorology and Climatology MeteoSwiss and the company Meteotest within the framework of the COST Action 727 2005 - 2008 of the European Union. The aim of this preliminary study is to identify the possibilities for the realisation of an alpine test site for wind turbines based on the existing infrastructure. The economic and technical conditions for the testing of both large and small wind turbines are discussed. Topics examined include site ownership and access, infrastructure and measurement systems, financing possibilities and a timeline for implementation.

  19. European windpower: project financing examined

    International Nuclear Information System (INIS)

    Mitchell, Catherine

    1993-01-01

    In part two of an examination of funding mechanisms for wind-generated electricity, the financing of wind projects in the major producers - Denmark, the Netherlands, Germany and the UK is examined. Part one examined the tariff and subsidy mechanisms available for wind generation in the same countries. (author)

  20. CLIPPERS-like MRI findings in a patient with multiple sclerosis.

    Science.gov (United States)

    Ferreira, R M; Machado, G; Souza, A S; Lin, K; Corrêa-Neto, Y

    2013-04-15

    Chronic lymphocytic inflammation with pontine perivascular enhancement responsive to steroids (CLIPPERS) has been described as a clinically and radiologically distinct pontine-predominant encephalomyelitis with a favorable response to high dose corticosteroids and usually requiring chronic immunosuppresive therapy. Brain magnetic resonance imaging (MRI) reveals a characteristic pattern of punctate and curvilinear enhancement lesions in the pons extending variably to surrounding areas. We herein describe such imaging findings in a patient with a definite diagnosis of relapsing-remitting multiple sclerosis (MS). Copyright © 2013 Elsevier B.V. All rights reserved.

  1. Energy storage by compressed air. [using windpowered pumps

    Science.gov (United States)

    Szego, G. C.

    1973-01-01

    The feasibility of windpower energy storage by compressed air is considered. The system is comprised of a compressor, a motor, and a pump turbine to store air in caverns or aquifiers. It is proposed that storage of several days worth of compressed air up to 650 pounds per square inch can be used to push the aquifier up closer to the container dome and thus initiate piston action by simply compressing air more and more. More energy can be put into it by pressure increase or pushing back the water in the aquifier. This storage system concept has reheat flexibility and lowest cost effectiveness.

  2. Effect of a rough surface on the aerodynamic characteristics of a two-bladed wind-powered engine with cylindrical blades

    Science.gov (United States)

    Tanasheva, N. K.; Kunakbaev, T. O.; Dyusembaeva, A. N.; Shuyushbayeva, N. N.; Damekova, S. K.

    2017-11-01

    We have reported the results of experiments on determining the drag coefficient and the thrust coefficient of a two-bladed wind-powered engine based on the Magnus effect with rotating rough cylinders in the range of air flow velocity of 4-10 m/s (Re = 26800-90000) for a constant rotation number of a cylindrical blade about its own axis. The results show that an increase in the Reynolds number reduces the drag coefficient and the thrust coefficient. The extent of the influence of the relative roughness on the aerodynamic characteristics of the two-bladed wind-powered engine has been experimentally established.

  3. Benefits to the Europa Clipper Mission Provided by the Space Launch System

    Science.gov (United States)

    Creech, Stephen D.; Patel, Keyur

    2013-01-01

    The National Aeronautics and Space Administration's (NASA's) proposed Europa Clipper mission would provide an unprecedented look at the icy Jovian moon, and investigate its environment to determine the possibility that it hosts life. Focused on exploring the water, chemistry, and energy conditions on the moon, the spacecraft would examine Europa's ocean, ice shell, composition and geology by performing 32 low-altitude flybys of Europa from Jupiter orbit over 2.3 years, allowing detailed investigations of globally distributed regions of Europa. In hopes of expediting the scientific program, mission planners at NASA's Jet Propulsion Laboratory are working with the Space Launch System (SLS) program, managed at Marshall Space Flight Center. Designed to be the most powerful launch vehicle ever flown, SLS is making progress toward delivering a new capability for exploration beyond Earth orbit. The SLS rocket will offer an initial low-Earth-orbit lift capability of 70 metric tons (t) beginning with a first launch in 2017 and will then evolve into a 130 t Block 2 version. While the primary focus of the development of the initial version of SLS is on enabling human exploration missions beyond low Earth orbit using the Orion Multi-Purpose Crew Vehicle, the rocket offers unique benefits to robotic planetary exploration missions, thanks to the high characteristic energy it provides. This paper will provide an overview of both the proposed Europa Clipper mission and the Space Launch System vehicle, and explore options provided to the Europa Clipper mission for a launch within a decade by a 70 t version of SLS with a commercially available 5-meter payload fairing, through comparison with a baseline of current Evolved Expendable Launch Vehicle (EELV) capabilities. Compared to that baseline, a mission to the Jovian system could reduce transit times to less than half, or increase mass to more than double, among other benefits. In addition to these primary benefits, the paper will

  4. Mounting and performance measurements of a PV array addition to an existing small wind-power installation for greenhouse electric supply in Patagonia

    Directory of Open Access Journals (Sweden)

    Rafael Oliva

    2016-08-01

    Full Text Available A small wind-power system intended for electric supply of a research greenhouse at the local University facilities in San Julian region incorporates a photovoltaic (PV array and regulator, which is described in this report together with its data-acquisition system. The main application is control and lighting. The Alternative Energy Group at the University seeks through this project to acquire knowledge and practical experience in the combination of renewable energy sources for optimal electrical supply of isolated systems, their associated measurements and processing of resulting data

  5. Windpower's future grows brighter

    International Nuclear Information System (INIS)

    Flavin, C.

    1995-01-01

    Modern technologies to generate electricity from windpower were introduced only 15 years ago. Today, equipment and control improvements have moved this benign process into a strong competitive position, both nationally and internationally. Altogether, the world had roughly 20,000 wind turbines in operation by the end of 1993, producing 3,000 megawatts of electricity. More than a dozen American and European companies, many with government assistance, are pursuing advanced wind technologies that are believed capable of closing the remaining cost gap with fossil fuel plants. According to one study, the average capacity factor of Californian wind turbines -- the percentage of their annual power potential generated -- rose from 13 in 1987 to 24 in 1990. These machines are now estimated to be ''available'' to operate 95 percent of the time, which is better than most fossil fuel plants. The machines now entering the market generate 300--750 kilowatts per turbine rather than the 100-kilowatt average of the late eighties' models. They have lighter and more aerodynamic blades made of synthetic materials, improved rotor-hub connections and drive trains, new blade controls, and more advanced power electronics, including some that operate at variable speeds, which allows the turbines to run more efficiently in a range of winds. The new designs are less expensive and can be deployed in more moderate wind regimes. In 1994, wind developers using the new technology signed contracts to sell wind-generated electricity for as low as 4--5 cents per kilowatt-hour

  6. Comparison of two new short-term wind-power forecasting systems

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez-Rosado, Ignacio J. [Department of Electrical Engineering, University of Zaragoza, Zaragoza (Spain); Fernandez-Jimenez, L. Alfredo [Department of Electrical Engineering, University of La Rioja, Logrono (Spain); Monteiro, Claudio; Sousa, Joao; Bessa, Ricardo [FEUP, Fac. Engenharia Univ. Porto (Portugal)]|[INESC - Instituto de Engenharia de Sistemas e Computadores do Porto, Porto (Portugal)

    2009-07-15

    This paper presents a comparison of two new advanced statistical short-term wind-power forecasting systems developed by two independent research teams. The input variables used in both systems were the same: forecasted meteorological variable values obtained from a numerical weather prediction model; and electric power-generation registers from the SCADA system of the wind farm. Both systems are described in detail and the forecasting results compared, revealing great similarities, although the proposed structures of the two systems are different. The forecast horizon for both systems is 72 h, allowing the use of the forecasted values in electric market operations, as diary and intra-diary power generation bid offers, and in wind-farm maintenance planning. (author)

  7. A compact plasma pre-ionized TEA-CO2 laser pulse clipper for material processing

    Science.gov (United States)

    Gasmi, Taieb

    2017-08-01

    An extra-laser cavity CO2-TEA laser pulse clipper using gas breakdown techniques for high spatial resolution material processing and shallow material engraving and drilling processes is presented. Complete extinction of the nitrogen tail, that extends the pulse width, is obtained at pressures from 375 up to 1500 torr for nitrogen and argon gases. Excellent energy stability and pulse repeatability were further enhanced using high voltage assisted preionized plasma gas technique. Experimental data illustrates the direct correlation between laser pulse width and depth of engraving in aluminum and alumina materials.

  8. Automating tasks in protein structure determination with the clipper python module.

    Science.gov (United States)

    McNicholas, Stuart; Croll, Tristan; Burnley, Tom; Palmer, Colin M; Hoh, Soon Wen; Jenkins, Huw T; Dodson, Eleanor; Cowtan, Kevin; Agirre, Jon

    2018-01-01

    Scripting programming languages provide the fastest means of prototyping complex functionality. Those with a syntax and grammar resembling human language also greatly enhance the maintainability of the produced source code. Furthermore, the combination of a powerful, machine-independent scripting language with binary libraries tailored for each computer architecture allows programs to break free from the tight boundaries of efficiency traditionally associated with scripts. In the present work, we describe how an efficient C++ crystallographic library such as Clipper can be wrapped, adapted and generalized for use in both crystallographic and electron cryo-microscopy applications, scripted with the Python language. We shall also place an emphasis on best practices in automation, illustrating how this can be achieved with this new Python module. © 2017 The Authors Protein Science published by Wiley Periodicals, Inc. on behalf of The Protein Society.

  9. The Plasma Instrument for Magnetic Sounding (PIMS) on The Europa Clipper Mission

    Science.gov (United States)

    Westlake, J. H.; McNutt, R. L., Jr.; Kasper, J. C.; Battista, C.; Case, A. W.; Cochrane, C.; Grey, M.; Jia, X.; Kivelson, M.; Kim, C.; Korth, H.; Khurana, K. K.; Krupp, N.; Paty, C. S.; Roussos, E.; Rymer, A. M.; Stevens, M. L.; Slavin, J. A.; Smith, H. T.; Saur, J.; Coren, D.

    2017-12-01

    The Europa Clipper mission is equipped with a sophisticated suite of 9 instruments to study Europa's interior and ocean, geology, chemistry, and habitability from a Jupiter orbiting spacecraft. The Plasma Instrument for Magnetic Sounding (PIMS) on Europa Clipper is a Faraday Cup based plasma instrument whose heritage dates back to the Voyager spacecraft. PIMS will measure the plasma that populates Jupiter's magnetosphere and Europa's ionosphere. The science goals of PIMS are to: 1) estimate the ocean salinity and thickness by determining Europa's magnetic induction response, corrected for plasma contributions; 2) assess mechanisms responsible for weathering and releasing material from Europa's surface into the atmosphere and ionosphere; and 3) understand how Europa influences its local space environment and Jupiter's magnetosphere and vice versa. Europa is embedded in a complex Jovian magnetospheric plasma, which rotates with the tilted planetary field and interacts dynamically with Europa's ionosphere affecting the magnetic induction signal. Plasma from Io's temporally varying torus diffuses outward and mixes with the charged particles in Europa's own torus producing highly variable plasma conditions at Europa. PIMS works in conjunction with the Interior Characterization of Europa using Magnetometry (ICEMAG) investigation to probe Europa's subsurface ocean. This investigation exploits currents induced in Europa's interior by the moon's exposure to variable magnetic fields in the Jovian system to infer properties of Europa's subsurface ocean such as its depth, thickness, and conductivity. This technique was successfully applied to Galileo observations and demonstrated that Europa indeed has a subsurface ocean. While these Galileo observations contributed to the renewed interest in Europa, due to limitations in the observations the results raised major questions that remain unanswered. PIMS will greatly refine our understanding of Europa's global liquid ocean by

  10. Collision risk in white-tailed eagles. Modelling kernel-based collision risk using satellite telemetry data in Smoela wind-power plant

    Energy Technology Data Exchange (ETDEWEB)

    May, Roel; Nygaard, Torgeir; Dahl, Espen Lie; Reitan, Ole; Bevanger, Kjetil

    2011-05-15

    Large soaring birds of prey, such as the white-tailed eagle, are recognized to be perhaps the most vulnerable bird group regarding risk of collisions with turbines in wind-power plants. Their mortalities have called for methods capable of modelling collision risks in connection with the planning of new wind-power developments. The so-called 'Band model' estimates collision risk based on the number of birds flying through the rotor swept zone and the probability of being hit by the passing rotor blades. In the calculations for the expected collision mortality a correction factor for avoidance behaviour is included. The overarching objective of this study was to use satellite telemetry data and recorded mortality to back-calculate the correction factor for white-tailed eagles. The Smoela wind-power plant consists of 68 turbines, over an area of approximately 18 km2. Since autumn 2006 the number of collisions has been recorded on a weekly basis. The analyses were based on satellite telemetry data from 28 white-tailed eagles equipped with backpack transmitters since 2005. The correction factor (i.e. 'avoidance rate') including uncertainty levels used within the Band collision risk model for white-tailed eagles was 99% (94-100%) for spring and 100% for the other seasons. The year-round estimate, irrespective of season, was 98% (95-99%). Although the year-round estimate was similar, the correction factor for spring was higher than the correction factor of 95% derived earlier from vantage point data. The satellite telemetry data may provide an alternative way to provide insight into relative risk among seasons, and help identify periods or areas with increased risk either in a pre- or post construction situation. (Author)

  11. 75 FR 76453 - Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco...

    Science.gov (United States)

    2010-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG10-65-000; EG10-66-000; EG10-67-000; EG10-68-000; EG10- 69-000; EG10-70-000; EG10-71-000] Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco Wind, LLC; Arizona Solar One LLC; Criterion...

  12. Design of an Autonomous Underwater Vehicle to Calibrate the Europa Clipper Ice-Penetrating Radar

    Science.gov (United States)

    Stone, W.; Siegel, V.; Kimball, P.; Richmond, K.; Flesher, C.; Hogan, B.; Lelievre, S.

    2013-12-01

    Jupiter's moon Europa has been prioritized as the target for the Europa Clipper flyby mission. A key science objective for the mission is to remotely characterize the ice shell and any subsurface water, including their heterogeneity, and the nature of surface-ice-ocean exchange. This objective is a critical component of the mission's overarching goal of assessing the habitability of Europa. The instrument targeted for addressing key aspects of this goal is an ice-penetrating radar (IPR). As a primary goal of our work, we will tightly couple airborne IPR studies of the Ross Ice Shelf by the Europa Clipper radar team with ground-truth data to be obtained from sub-glacial sonar and bio-geochemical mapping of the corresponding ice-water and water-rock interfaces using an advanced autonomous underwater vehicle (AUV). The ARTEMIS vehicle - a heavily morphed long-range, low drag variant of the highly successful 4-degree-of-freedom hovering sub-ice ENDURANCE bot -- will be deployed from a sea-ice drill hole adjacent the McMurdo Ice Shelf (MIS) and will perform three classes of missions. The first includes original exploration and high definition mapping of both the ice-water interface and the benthic interface on a length scale (approximately 10 kilometers under-ice penetration radius) that will definitively tie it to the synchronous airborne IPR over-flights. These exploration and mapping missions will be conducted at up to 10 different locations along the MIS in order to capture varying ice thickness and seawater intrusion into the ice shelf. Following initial mapping characterization, the vehicle will conduct astrobiology-relevant proximity operations using bio-assay sensors (custom-designed UV fluorescence and machine-vision-processed optical imagery) followed by point-targeted studies at regions of interest. Sample returns from the ice-water interface will be triggered autonomously using real-time-processed instrument data and onboard decision-to-collect algorithms

  13. Trajectory Design for the Europa Clipper Mission Concept

    Science.gov (United States)

    Buffington, Brent

    2014-01-01

    Europa is one of the most scientifically intriguing targets in planetary science due to its potential suitability for extant life. As such, NASA has funded the California Institute of Technology Jet Propulsion Laboratory and the Johns Hopkins University Applied Physics Laboratory to jointly determine and develop the best mission concept to explore Europa in the near future. The result of nearly 4 years of work--the Europa Clipper mission concept--is a multiple Europa flyby mission that could efficiently execute a number of high caliber science investigations to meet Europa science priorities specified in the 2011 NRC Decadal Survey, and is capable of providing reconnaissance data to maximize the probability of both a safe landing and access to surface material of high scientific value for a future Europa lander. This paper will focus on the major enabling component for this mission concept--the trajectory. A representative trajectory, referred to as 13F7-A21, would obtain global-regional coverage of Europa via a complex network of 45 flybys over the course of 3.5 years while also mitigating the effects of the harsh Jovian radiation environment. In addition, 5 Ganymede and 9 Callisto flybys would be used to manipulate the trajectory relative to Europa. The tour would reach a maximum Jovicentric inclination of 20.1 deg. have a deterministic (Delta)V of 164 m/s (post periapsis raise maneuver), and a total ionizing dose of 2.8 Mrad (Si).

  14. Coordinated control of a DFIG-based wind-power generation system with SGSC under distorted grid voltage conditions

    DEFF Research Database (Denmark)

    Yao, Jun; Li, Qing; Chen, Zhe

    2013-01-01

    in the multiple synchronous rotating reference frames. In order to counteract the adverse effects of the voltage harmonics upon the DFIG, the SGSC generates series compensation control voltages to keep the stator voltage sinusoidal and symmetrical, which allows the use of the conventional vector control strategy......This paper presents a coordinated control method for a doubly-fed induction generator (DFIG)-based wind-power generation system with a series grid-side converter (SGSC) under distorted grid voltage conditions. The detailed mathematical models of the DFIG system with SGSC are developed...

  15. Expected Recovery of Europa's Geophysical Attributes with Clipper Gravity Science Investigation

    Science.gov (United States)

    Verma, Ashok Kumar; Margot, Jean-Luc

    2017-10-01

    The primary gravity science objective of NASA’s Clipper mission to Europa is to confirm the presence or absence of a global subsurface ocean beneath Europa's icy crust. Gravity field measurements obtained with a radio science investigation can reveal much about Europa's interior structure. Here, we conduct extensive simulations of the radio science measurements with the anticipated spacecraft trajectory and attitude (17F12V2) and assets on the spacecraft and the ground, including antenna orientations and beam patterns, transmitter characteristics, and receiver noise figures. In addition to two-way Doppler measurements, we also include radar altimeter crossover range measurements. We concentrate on +/-2 hour intervals centered on the closest approach of each one of the 46 flybys. Our covariance analyses reveal the precision with which the tidal Love number k2, second-degree gravity coefficients C20 and C22, and higher-order gravity coefficients can be determined. The results depend strongly on the Deep Space Network (DSN) assets that are deployed to track the spacecraft. We find that some DSN allocations are sufficient to conclusively confirm the presence or absence of a global ocean and to evaluate whether the ice shell is hydrostatic.

  16. Investigation of the mineral potential of the Clipper Gap, Lone Mountain-Weepah, and Pipe Spring plutons, Nevada

    International Nuclear Information System (INIS)

    Tingley, J.V.; Maldonado, F.

    1983-01-01

    The Clipper Gap pluton, composed mostly of quartz monzonite with minor granite, granodiorite, and crosscutting alaskite dikes, intrudes Paleozoic western facies strata. A narrow zone of contact metamorphism is present at the intrusive-sediment contact. No mineral production has been recorded from Clipper Gap, but quartz veins containing gold-silver-copper mineral occurrences have been prospected there from the late 1800's to the present. Areas of the Lone Mountain-Weepah plutons that were studied are located in Esmeralda County about 14 km west of Tonopah, Nevada. At Lone Mountain, a Cretaceous intrusive cuts folded Precambrian and Cambrian sediments. Lead-zinc ores have been mined from small replacement ore bodies in the Alpine district, west of Lone Mountain. Copper and molybdenum occurrences have been found along the east flank of Lone Mountain, and altered areas were noted in intrusive outcrops around the south end of Lone Mountain. Mineral occurrences are widespread and varied with mining activity dating back to the 1860's. The Pipe Spring pluton study area is flanked by two important mining districts, Manhattan to the north and Belmont to the northeast. Mining activity at Belmont dates from 1865. Activity at Manhattan was mainly between 1907 and 1947, but the district is active at the present time (1979). Four smaller mining areas, Monarch, Spanish Springs, Baxter Spring, and Willow Springs, are within the general boundary of the area. The Pipe Spring pluton study area contains numerous prospects along the northern contact zone of the pluton. Tungsten-bearing veins occur within the pluton near Spanish Springs, with potential for gold-tungsten placer in the Ralston Valley. Nickel and associated metals occur at Willow Spring and Monarch Ranch, where prospects may be associated with the margin of the Big Ten Peak Caldera

  17. Expansion of Hitra wind-power plant - consequences related to wildlife except birds; Etterundersoekingar og konsekvens-utgreiingar for Hitra vindpark (Hitra 2). Naturmiljoe med unntak av fugleliv

    Energy Technology Data Exchange (ETDEWEB)

    Veiberg, V.; Pedersen, H.C.

    2010-02-15

    Hitra wind-power plant today consists of 24 wind turbines located at Eldsfjellet. The power plant was officially opened in October 2004 after approximately one year of construction work. As part of the establishment of the park, 20 km of roads with solid rock foundation was built. In addition, 25 km of earth cable was dug down, and a 10 km power line to Fillan was constructed. A second building step including between 15 and 25 new turbines and belonging infrastructure, is now being planned. In addition, about 10 km of new power line need to be built between the power plant and a new sub-sea power cable to Tjeldbergodden. One of the alternatives for the enlargement also includes construction of a new service road from the south. This report evaluates to what extent the present wind-power plant has had detectable consequences for the terrestrial fauna (except avifauna) at Eldsfjellet or in its surroundings. We also look into whether the establishment has had an impact on the hunting activity. Likely consequences of the next building step are evaluated for the same matters as the post-construction investigation. There are no indications that the construction of Hitra wind-power plant has caused lasting effects on the terrestrial fauna within the area of influence. For red deer, temporary avoidance of influence areas was registered during the construction period. This was not found to cause reduction neither in the harvest numbers, nor in the hunting related income for the various hunting areas. The construction of roads in relation to the power plant has been beneficial for the red deer hunt in the areas east, north and west of Eldsfjellet. The two suggested alternatives for enlargement of Hitra wind-power plant will to a varying degree affect attractive red deer habitats. These areas are also popular hunting grounds. The expected negative impacts from a power plant enlargement are mainly related to habitat loss due to technical installations and construction of roads

  18. Improved Control Strategies for a DFIG-Based Wind-Power Generation System with SGSC under Unbalanced and Distorted Grid Voltage Conditions

    DEFF Research Database (Denmark)

    Yao, Jun; Yu, Mengting; Hu, Weihao

    2016-01-01

    This paper investigates an improved control strategy for a doubly-fed induction generator (DFIG) based wind-power generation system with series grid-side converter (SGSC) under network unbalance and harmonic grid voltage distortion conditions. The integrated mathematical modeling of the DFIG system...... with SGSC is established by taking both the negative-sequence and harmonic components of the grid voltages into consideration with multiple synchronous rotating reference frames. Under network unbalance and harmonic distortion situations, stator voltage can be kept symmetrical and sinusoidal by the control...

  19. Clipper Meets Apple vs. FBI—A Comparison of the Cryptography Discourses from 1993 and 2016

    Directory of Open Access Journals (Sweden)

    Matthias Schulze

    2017-03-01

    Full Text Available This article analyzes two cryptography discourses dealing with the question of whether governments should be able to monitor secure and encrypted communication, for example via security vulnerabilities in cryptographic systems. The Clipper chip debate of 1993 and the FBI vs. Apple case of 2016 are analyzed to infer whether these discourses show similarities in their arguments and to draw lessons from them. The study is based on the securitization framework and analyzes the social construction of security threats in political discourses. The findings are that the arguments made by the proponents of exceptional access show major continuities between the two cases. In contrast, the arguments of the critics are more diverse. The critical arguments for stronger encryption remain highly relevant, especially in the context of the Snowden revelations. The article concludes that we need to adopt a more general cyber security perspective, considering the threat of cyber crime and state hacking, when debating whether the government should be able to weaken encryption.

  20. Ultra-Short-Term Wind-Power Forecasting Based on the Weighted Random Forest Optimized by the Niche Immune Lion Algorithm

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-04-01

    Full Text Available The continuous increase in energy consumption has made the potential of wind-power generation tremendous. However, the obvious intermittency and randomness of wind speed results in the fluctuation of the output power in a wind farm, seriously affecting the power quality. Therefore, the accurate prediction of wind power in advance can improve the ability of wind-power integration and enhance the reliability of the power system. In this paper, a model of wavelet decomposition (WD and weighted random forest (WRF optimized by the niche immune lion algorithm (NILA-WRF is presented for ultra-short-term wind power prediction. Firstly, the original serials of wind speed and power are decomposed into several sub-serials by WD because the original serials have no obvious day characteristics. Then, the model parameters are set and the model trained with the sub-serials of wind speed and wind power decomposed. Finally, the WD-NILA-WRF model is used to predict the wind power of the relative sub-serials and the result is reconstructed to obtain the final prediction result. The WD-NILA-WRF model combines the advantage of each single model, which uses WD for signal de-noising, and uses the niche immune lion algorithm (NILA to improve the model’s optimization efficiency. In this paper, two empirical analyses are carried out to prove the accuracy of the model, and the experimental results verify the proposed model’s validity and superiority compared with the back propagation neural network (BP neural network, support vector machine (SVM, RF and NILA-RF, indicating that the proposed method is superior in cases influenced by noise and unstable factors, and possesses an excellent generalization ability and robustness.

  1. Exploring Ocean-World Habitability within the Planned Europa Clipper Mission

    Science.gov (United States)

    Pappalardo, R. T.; Senske, D.; Korth, H.; Blaney, D. L.; Blankenship, D. D.; Collins, G. C.; Christensen, P. R.; Gudipati, M. S.; Kempf, S.; Lunine, J. I.; Paty, C. S.; Raymond, C. A.; Rathbun, J.; Retherford, K. D.; Roberts, J. H.; Schmidt, B. E.; Soderblom, J. M.; Turtle, E. P.; Waite, J. H., Jr.; Westlake, J. H.

    2017-12-01

    A key driver of planetary exploration is to understand the processes that lead to potential habitability across the solar system, including within oceans hosted by some icy satellites of the outer planets. In this context, it is the overarching science goal of the planned Europa Clipper mission is: Explore Europa to investigate its habitability. Following from this goal are three mission objectives: (1) Characterize the ice shell and any subsurface water, including their heterogeneity, ocean properties, and the nature of surface-ice-ocean exchange; (2) Understand the habitability of Europa's ocean through composition and chemistry; and (3) Understand the formation of surface features, including sites of recent or current activity, and characterize high science interest localities. Folded into these objectives is the desire to search for and characterize any current activity, notably plumes and thermal anomalies. A suite of nine remote-sensing and in-situ observing instruments is being developed that synergistically addresses these objectives. The remote-sensing instruments are the Europa UltraViolet Spectrograph (Europa-UVS), the Europa Imaging System (EIS), the Mapping Imaging Spectrometer for Europa (MISE), the Europa THErMal Imaging System (E-THEMIS), and the Radar for Europa Assessment and Sounding: Ocean to Near-surface (REASON). The instruments providing in-situ observations are the Interior Characterization of Europa using Magnetometry (ICEMAG), the Plasma Instrument for Magnetic Sounding (PIMS), the MAss Spectrometer for Planetary EXploration (MASPEX), and the SUrface Dust Analyzer (SUDA). In addition, gravity science can be achieved via the spacecraft's telecommunication system, and the planned radiation monitoring system could provide information on Europa's energetic particle environment. Working together, the mission's robust investigation suite can be used to test hypotheses and enable discoveries relevant to the interior, composition, and geology of

  2. Informing decision makers and identifying niche opportunities for windpower: use of multiattribute trade off analysis to evaluate non-dispatchable resources

    International Nuclear Information System (INIS)

    Connors, S.R.

    1996-01-01

    The operational and flexibility characteristics of renewable energy technologies are often overlooked in traditional head to head technology comparisons. This impedes their adoption since identification of environmental and risk mitigation advantages requires evaluation of such non-dispatchable technologies in a systemwide context. Use of multiattribute resource planning tools in a trade off analysis framework identifies the complementary emissions reduction and fuel diversification characteristics of renewables. Data visualization using trade off analysis communicates electric resource interactions and the risks of following various strategies to diverse stakeholder audiences, promoting acceptance. This paper provides an overview of the multiattribute trade off approach and applies it to resource strategies incorporating windpower in the New England regional power system. Examples focus on the interaction of wind resources with demand-side management and supply-side options under fuel cost uncertainty. (Author)

  3. Enhanced Control for a Direct-driven Permanent Synchronous Generator Wind-power Generation System with Flywheel Energy Storage Unit Under Unbalanced Grid Fault

    DEFF Research Database (Denmark)

    Yao, Jun; Zhou, Te; Hu, Weihao

    2015-01-01

    This article presents an enhanced control strategy for a direct-driven permanent synchronous generator based wind-power generation system with a flywheel energy storage unit. The behaviors of the direct-driven permanent magnet synchronous generator system with a flywheel energy storage unit under......, the DC-link voltage oscillations can be effectively suppressed during the unbalanced grid fault by controlling the flywheel energy storage unit. Furthermore, a proportional–integral-resonant controller is designed for the flywheel motor to eliminate the oscillations in the DC-link voltage. Finally......, the proposed coordinated control strategy for the direct-driven permanent magnet synchronous generator system with a flywheel energy storage unit has been validated by the simulation results of a 1-MW direct-driven permanent magnet synchronous generator wind power generation system with a flywheel energy...

  4. Joint NEPA/SEPA draft environmental impact statement Washington Windplant No. 1

    International Nuclear Information System (INIS)

    1995-02-01

    This is the draft Environmental Impact Statement for a proposed construction and operation of a 115 megawatt Washington Windplant No. 1 by KENETECH Windpower, Inc in Klickitat County, Washington. The Project would be constructed on private land (5,110 hectares) under easement to KENETECH Windpower, Inc., and would include approximately 345 type 33M-VS wind turbines. Alternatives to the Proposed Action include an alternative powerline route; a restricted areas alternative; a subarea development alternative; a no-action alternative

  5. 77 FR 56209 - Notice of Agreements Filed

    Science.gov (United States)

    2012-09-12

    ... Yusen Kaisha Line; Orient Overseas Container Line Limited; and Yangming Marine Transport Corp. Filing... & Logistics GmbH & Co. KG; Beluga Chartering GmbH; Chipolbrok; Clipper Project Ltd.; Hyndai Merchant Marine Co...

  6. Searches for dead birds in Smoela wind-power plant area 2011: annual report; Soek etter doede fugler i Smoela vindpark 2011: aarsrapport

    Energy Technology Data Exchange (ETDEWEB)

    Reitan, Ole

    2012-07-01

    This report describes the searches for dead birds in the Smoela wind-power plant area (SWPPA) in 2011, and compares the results of the dead birds found with 2006-2010.The search effort in 2006-2010 was systematic, as the same method and procedures were followed, with the same effort each week throughout each year. The results of dead birds found could thus be compared between years, seasons, months, and the different parts of the wind-power plant and single turbines. The data could be used to calculate averages found each year, and also now making it possible to estimate total numbers annually colliding with turbines for several species. These data are therefore a good basis for comparing result for later years. To search for dead birds, localize and recording wind turbine victims are the first steps towards estimating real collision numbers in a wind-power plant area. In addition, there are several bi-ases affecting the proportion of dead birds available for searches. Several methods may be used, among them different approaches using dogs. In the SWPPA a feather search dog was used, to search, find and indicate feathers and other remains from dead birds. In 2006-2010 two dogs were used in SWPPA, both with god search qualities. In 2011 the best of these dogs, the giant schnauzer Luna, was used on all turbine searches. The search motivation of Luna has been very good in nearly all searches in 2011. The search results from SWPPA therefore are as reliable as possible today. In 2011 searches were carried out at all turbines five times, three in spring (5-7 April, 29 April to 1 May, 26-28 May) and two in autumn (12-15 September, 21-22 November). In April to May a total of 203 turbine searches were performed. In each of the previous years, the total numbers of turbine searches in the spring (March - 15 June) varied between 359 and 473. In autumn 2011 a total of 136 turbine searches were performed, about 60 % of each of the previous years in the months September

  7. Two-stage robust UC including a novel scenario-based uncertainty model for wind power applications

    International Nuclear Information System (INIS)

    Álvarez-Miranda, Eduardo; Campos-Valdés, Camilo; Rahmann, Claudia

    2015-01-01

    Highlights: • Methodological framework for obtaining Robust Unit Commitment (UC) policies. • Wind-power forecast using a revisited bootstrap predictive inference approach. • Novel scenario-based model for wind-power uncertainty. • Efficient modeling framework for obtaining nearly optimal UC policies in reasonable time. • Effective incorporation of wind-power uncertainty in the UC modeling. - Abstract: The complex processes involved in the determination of the availability of power from renewable energy sources, such as wind power, impose great challenges in the forecasting processes carried out by transmission system operators (TSOs). Nowadays, many of these TSOs use operation planning tools that take into account the uncertainty of the wind-power. However, most of these methods typically require strict assumptions about the probabilistic behavior of the forecast error, and usually ignore the dynamic nature of the forecasting process. In this paper a methodological framework to obtain Robust Unit Commitment (UC) policies is presented; such methodology considers a novel scenario-based uncertainty model for wind power applications. The proposed method is composed by three main phases. The first two phases generate a sound wind-power forecast using a bootstrap predictive inference approach. The third phase corresponds to modeling and solving a one-day ahead Robust UC considering the output of the first phase. The performance of proposed approach is evaluated using as case study a new wind farm to be incorporated into the Northern Interconnected System (NIS) of Chile. A projection of wind-based power installation, as well as different characteristic of the uncertain data, are considered in this study

  8. Evaluation of the DTBird video-system at the Smoela wind-power plant. Detection capabilities for capturing near-turbine avian behaviour

    Energy Technology Data Exchange (ETDEWEB)

    Roel, May; Hamre, Oeyvind; Vang, Roald; Nygaard, Torgeir

    2012-07-01

    Collisions between birds and wind turbines can be a problem at wind-power plants both onshore and offshore, and the presence of endangered bird species or proximity to key functional bird areas can have major impact on the choice of site or location wind turbines. There is international consensus that one of the mail challenges in the development of measures to reduce bird collisions is the lack of good methods for assessment of the efficacy of inventions. In order to be better abe to assess the efficacy of mortality-reducing measures Statkraft wishes to find a system that can be operated under Norwegian conditions and that renders objective and quantitative information on collisions and near-flying birds. DTbird developed by Liquen Consultoria Ambiental S.L. is such a system, which is based on video-recording bird flights near turbines during the daylight period (light levels>200 lux). DTBird is a self-working system developed to detect flying birds and to take programmed actions (i.e. warming, dissuasion, collision registration, and turbine stop control) linked to real-time bird detection. This report evaluates how well the DTBird system is able to detect birds in the vicinity of a wind turbine, and assess to which extent it can be utilized to study near-turbine bird flight behaviour and possible deterrence. The evaluation was based on the video sequence recorded with the DTBird systems installed at turbine 21 and turbine 42 at the Smoela wind-power plant between March 2 2012 and September 30 2012, together with GPS telemetry data on white-tailed eagles and avian radar data. The average number of falsely triggered video sequences (false positive rate) was 1.2 per day, and during daytime the DTBird system recorded between 76% and 96% of all bird flights in the vicinity of the turbines. Visually estimated distances of recorded bird flights in the video sequences were in general assessed to be farther from the turbines com pared to the distance settings used within

  9. Test of solar dryers in Ghana

    Energy Technology Data Exchange (ETDEWEB)

    Oestergaard Jensen, S. [Teknologisk Institut. SolEnergiCentret, Taastrup (Denmark); Floejgaard Kristensen, E. [Danmarks JordbrugsForskning, Tjele (Denmark); Agyei, F. [FAGOD Ltd. (Ghana); Larsen, T. [Clipper Design Ltd. (Ghana); Nketiah, K.S. [FORIG (Ghana)

    2002-06-01

    The report describes the tests carried out in Ghana on three solar dryers as part of the project 'Test and Research Project into the Drying of Food and Wood Products with Solar Heat' financed by DANIDA. The main objective of the project was to develop and test solar dryers for crop, fish and wood in Ghana. Three dryers were erected: 1. Solar crop dryer: The solar crop dryer was erected at Silwood Farms at Pokuase about 30 km north of Accra. Silwood Farms grows primarily maize for seed and pineapples, 2. Solar fish dryer: The solar fish dryer was erected at Elite Enterprise Ltd. at Tema about 35 km east-north-east of Accra. Elite Enterprise Ltd. buys and dries fish, 3. Solar wood dryer: The solar wood dryers were erected at Clipper Design Ltd. at Mankoadze about 65 km west-south-west of Accra. Clipper Design Ltd. produces mainly doors. (BA)

  10. Tracing And Control Of Engineering Requirements

    Science.gov (United States)

    Turner, Philip R.; Stoller, Richard L.; Neville, Ted; Boyle, Karen A.

    1991-01-01

    TRACER (Tracing and Control of Engineering Requirements) is data-base/word-processing software system created to document and maintain order of both requirements and descriptions associated with engineering project. Implemented on IBM PC under PC-DOS. Written with CLIPPER.

  11. The impact of monsoon intraseasonal variability on renewable power generation in India

    International Nuclear Information System (INIS)

    Dunning, C M; Turner, A G; Brayshaw, D J

    2015-01-01

    India is increasingly investing in renewable technology to meet rising energy demands, with hydropower and other renewables comprising one-third of current installed capacity. Installed wind-power is projected to increase 5-fold by 2035 (to nearly 100GW) under the International Energy Agency's New Policies scenario. However, renewable electricity generation is dependent upon the prevailing meteorology, which is strongly influenced by monsoon variability. Prosperity and widespread electrification are increasing the demand for air conditioning, especially during the warm summer. This study uses multi-decadal observations and meteorological reanalysis data to assess the impact of intraseasonal monsoon variability on the balance of electricity supply from wind-power and temperature-related demand in India. Active monsoon phases are characterized by vigorous convection and heavy rainfall over central India. This results in lower temperatures giving lower cooling energy demand, while strong westerly winds yield high wind-power output. In contrast, monsoon breaks are characterized by suppressed precipitation, with higher temperatures and hence greater demand for cooling, and lower wind-power output across much of India. The opposing relationship between wind-power supply and cooling demand during active phases (low demand, high supply) and breaks (high demand, low supply) suggests that monsoon variability will tend to exacerbate fluctuations in the so-called demand-net-wind (i.e., electrical demand that must be supplied from non-wind sources). This study may have important implications for the design of power systems and for investment decisions in conventional schedulable generation facilities (such as coal and gas) that are used to maintain the supply/demand balance. In particular, if it is assumed (as is common) that the generated wind-power operates as a price-taker (i.e., wind farm operators always wish to sell their power, irrespective of price) then investors

  12. The impact of monsoon intraseasonal variability on renewable power generation in India

    Science.gov (United States)

    Dunning, C. M.; Turner, A. G.; Brayshaw, D. J.

    2015-06-01

    India is increasingly investing in renewable technology to meet rising energy demands, with hydropower and other renewables comprising one-third of current installed capacity. Installed wind-power is projected to increase 5-fold by 2035 (to nearly 100GW) under the International Energy Agency's New Policies scenario. However, renewable electricity generation is dependent upon the prevailing meteorology, which is strongly influenced by monsoon variability. Prosperity and widespread electrification are increasing the demand for air conditioning, especially during the warm summer. This study uses multi-decadal observations and meteorological reanalysis data to assess the impact of intraseasonal monsoon variability on the balance of electricity supply from wind-power and temperature-related demand in India. Active monsoon phases are characterized by vigorous convection and heavy rainfall over central India. This results in lower temperatures giving lower cooling energy demand, while strong westerly winds yield high wind-power output. In contrast, monsoon breaks are characterized by suppressed precipitation, with higher temperatures and hence greater demand for cooling, and lower wind-power output across much of India. The opposing relationship between wind-power supply and cooling demand during active phases (low demand, high supply) and breaks (high demand, low supply) suggests that monsoon variability will tend to exacerbate fluctuations in the so-called demand-net-wind (i.e., electrical demand that must be supplied from non-wind sources). This study may have important implications for the design of power systems and for investment decisions in conventional schedulable generation facilities (such as coal and gas) that are used to maintain the supply/demand balance. In particular, if it is assumed (as is common) that the generated wind-power operates as a price-taker (i.e., wind farm operators always wish to sell their power, irrespective of price) then investors in

  13. Windpower. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of wind power. The subheadings of the directory include developers and owner operators, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  14. When is enough, enough? Identifying predictors of capacity estimates for onshore wind-power development in a region of the UK

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Christopher R., E-mail: c.r.jones@shef.ac.uk [Department of Psychology, University of Sheffield, Western Bank, Sheffield, S10 2TP (United Kingdom); Orr, Barry J.; Eiser, J. Richard [Department of Psychology, University of Sheffield, Western Bank, Sheffield, S10 2TP (United Kingdom)

    2011-08-15

    The level of 'wind-prospecting' presently occurring in the UK is increasing the likelihood that new wind-power developments will conflict with other existing and/or proposed schemes. This study reports multiple-regression analyses performed on survey data obtained in a region of the UK (i.e. Humberhead Levels, near Doncaster) simultaneously subject to nine wind-farm proposals (September 2008). The aim of the analysis was to identify which survey-items were predictors of respondents' estimates of the number of wind turbines they believed the region could reasonably support (i.e. capacity estimates). The results revealed that the majority of respondents would endorse some local development; however, there was substantial variability in the upper level that was considered acceptable. Prominent predictors included general attitude, perceived knowledge of wind power, community attachment, environmental values, visual attractiveness of wind turbines, and issues relating to perceived fairness and equity. The results have implications for Cumulative Effects Assessment (CEA) - and in particular the assessment of Cumulative Landscape and Visual Impacts (CLVI) - and support calls for greater community involvement in decisions regarding proposed schemes. - Highlights: > Research seeks to identify predictors of the scale of local wind development people will tolerate. > Research conducted in region of the UK subject to nine wind-farm applications (2008). > Predictors found to include issues of perceived fairness and equity. > Results hold implications for cumulative effects assessment and development practices.

  15. When is enough, enough? Identifying predictors of capacity estimates for onshore wind-power development in a region of the UK

    International Nuclear Information System (INIS)

    Jones, Christopher R.; Orr, Barry J.; Eiser, J. Richard

    2011-01-01

    The level of 'wind-prospecting' presently occurring in the UK is increasing the likelihood that new wind-power developments will conflict with other existing and/or proposed schemes. This study reports multiple-regression analyses performed on survey data obtained in a region of the UK (i.e. Humberhead Levels, near Doncaster) simultaneously subject to nine wind-farm proposals (September 2008). The aim of the analysis was to identify which survey-items were predictors of respondents' estimates of the number of wind turbines they believed the region could reasonably support (i.e. capacity estimates). The results revealed that the majority of respondents would endorse some local development; however, there was substantial variability in the upper level that was considered acceptable. Prominent predictors included general attitude, perceived knowledge of wind power, community attachment, environmental values, visual attractiveness of wind turbines, and issues relating to perceived fairness and equity. The results have implications for Cumulative Effects Assessment (CEA) - and in particular the assessment of Cumulative Landscape and Visual Impacts (CLVI) - and support calls for greater community involvement in decisions regarding proposed schemes. - Highlights: → Research seeks to identify predictors of the scale of local wind development people will tolerate. → Research conducted in region of the UK subject to nine wind-farm applications (2008). → Predictors found to include issues of perceived fairness and equity. → Results hold implications for cumulative effects assessment and development practices.

  16. Wind-powered wheel locomotion, initiated by leaping somersaults, in larvae of the southeastern beach tiger beetle (Cicindela dorsalis media.

    Directory of Open Access Journals (Sweden)

    Alan Harvey

    2011-03-01

    Full Text Available Rapid movement is challenging for elongate, soft-bodied animals with short or no legs. Leaping is known for only a few animals with this "worm-like" morphology. Wheel locomotion, in which the animal's entire body rolls forward along a central axis, has been reported for only a handful of animals worldwide. Here we present the first documented case of wind-powered wheel locomotion, in larvae of the coastal tiger beetle Cicindela dorsalis media. When removed from their shallow burrows, larvae easily can be induced to enter a behavioral sequence that starts with leaping; while airborne, larvae loop their body into a rotating wheel and usually either "hit the ground rolling" or leap again. The direction larvae wheel is closely related to the direction in which winds are blowing; thus, all our larvae wheeled up-slope, as winds at our study site consistently blew from sea to land. Stronger winds increased both the proportion of larvae wheeling, and the distance traveled, exceeding 60 m in some cases. In addition, the proportion of larvae that wheel and the distance traveled by wheeling larvae are significantly greater on smooth sandy beaches than on beach surfaces made rough and irregular by pedestrian, equestrian, and vehicular traffic. Like other coastal species of tiger beetles, C. dorsalis media has suffered major declines in recent years that are clearly correlated with increased human impacts. The present study suggests that the negative effects of beach traffic may be indirect, preventing larvae from escaping from predators using wheel locomotion by disrupting the flat, hard surface necessary for efficient wheeling.

  17. Top of the list

    International Nuclear Information System (INIS)

    Cameron, A.; Vries, E. de

    2006-01-01

    In this article the authors look at how the major turbine suppliers fared in the year 2005, and look forward to 2006 which could be the best ever for the wind industry. The world wind turbine market continues to be dominated by ten major companies, who together account for almost 100% of the total global market. Although there are some new companies on the horizon it is the ten major companies that the authors concentrate on, in particular the top three, Vestas, Gamesa and Enercon who between them control 66% of the market. They give their overall report on business in 2005 and give their predictions for 2006. By far the leading wind turbine supplier is the Danish Company Vestas, accounting for over 30% of the global market. However all of the top ten companies report a successful year and all are expecting an even better 2006. This paper also reports on potential newcomers to the industry, one of these is California-based Clipper Windpower which commenced manufacturing the 2.5 MW Liberty turbine in Iowa. Chinese manufacturer Goldwind is also looking to enter the market having acquired a licence to produce the Vensys 1.2 MW turbine. It may well be that changes are on the way, there will be jockeying for position at the top and newcomers will want to make an impression on the market

  18. Windpower opposition : notify, consult, engage or partnership?

    Energy Technology Data Exchange (ETDEWEB)

    Prier, P.G. [Stantec Consulting, Guelph, ON (Canada)

    2010-07-01

    This PowerPoint presentation discussed some of the methods that can be used to understand and defuse opposition to wind power projects. The presentation discussed the actual empowerment of communities and citizens as opposed to the token gestures often used by large organizations to placate and manipulate stakeholders. Stakeholders were defined as regulatory authorities, directly and indirectly affected landowners, non-government organizations, First Nations groups, and anyone in or outside the study area with an interest in the prospective development. The consultation scope should reflect the significance of potential effects and be conducted early in the decision-making process. The design of the project and its implementation should be transparent, and operators should be responsive to all concerns and questions. A range of consultation techniques should be used to reflect the nature of different stakeholders. Community engagement should support mutual respect of values in order to create an authentic decision-making partnership. Communities should be notified when routine operational or maintenance activities are being conducted. Consultations are required for increases in nameplate capacity of less than 25 percent. Community engagement is required for the development of greenfield wind farms greater than 20 MW. tabs., figs.

  19. CO2-Tea pulse clipping using pulsed high voltage preionization for high spatial resolution I.R. Lidar systems

    Directory of Open Access Journals (Sweden)

    Gasmi Taieb

    2018-01-01

    Full Text Available An extra-cavity CO2-TEA laser pulse clipper for high spatial resolution atmospheric monitoring is presented. The clipper uses pulsed high voltageto facilitate the breakdown of the gas within the clipper cell. Complete extinction of the nitrogen tail, that degrades the range resolution of LIDARS, is obtained at pressures from 375 up to 1500 Torr for nitrogen and argon gases whereas an attenuation coefficient of almost 102 is achieved for helium. Excellent energy stability and pulse width repeatability were achieved using high voltage pre-ionized gas technique.

  20. CO2-Tea pulse clipping using pulsed high voltage preionization for high spatial resolution I.R. Lidar systems

    Science.gov (United States)

    Gasmi, Taieb

    2018-04-01

    An extra-cavity CO2-TEA laser pulse clipper for high spatial resolution atmospheric monitoring is presented. The clipper uses pulsed high voltageto facilitate the breakdown of the gas within the clipper cell. Complete extinction of the nitrogen tail, that degrades the range resolution of LIDARS, is obtained at pressures from 375 up to 1500 Torr for nitrogen and argon gases whereas an attenuation coefficient of almost 102 is achieved for helium. Excellent energy stability and pulse width repeatability were achieved using high voltage pre-ionized gas technique.

  1. Forecasting the U.S. market for windpower

    International Nuclear Information System (INIS)

    Hoffman, G.; Garges, K.

    1996-01-01

    Projections to the middle of the next century indicate that future wind-electricity is likely to cost from 5.5 to 7.7 cents per kWh, and that its US market share may be around 4 to 5% of the total. Wind-turbines produce electricity cheaper than nuclear powerplants and may soon become competitive with fossil-fueled generators. As wind's clear superiority to nuclear accelerates, utilities may need new marketability assessments: this one is based on their own criterion, namely the outlook for the cost of electricity (CoE) to the customer. The study compiled others' estimates for distant-future wind-CoE (WCoE) and fossil-CoE (FCoE), and a way of forecasting wind-electricity market size 50 years hence

  2. THE PHOENIX PROJECT: SHIFTING TO A SOLAR HYDROGEN ECONOMY BY 2020

    Directory of Open Access Journals (Sweden)

    HARRY BRAUN

    2008-07-01

    Full Text Available The most serious energy, economic and environmental problems are related to the use of fossil and nuclear fuels, which are rapidly diminishing and highly polluting, and many distinguished atmospheric chemists, including Dr. James Hanson at NASA, Dr. Steven Chu, the director of Lawrence Livermore Laboratory, and Professor Ralph Cicerone, president of the National Academy of Sciences have documented that climate changes are now occurring much faster than predicted just a few years ago. The methane hydrates in the oceans and the permafrost in vast areas of the Artic regions of Siberia, Alaska and Canada are now starting to rapidly melt, and given this could release 50 to 100 times more carbon into the atmosphere than is now generated from the burning of fossil fuels, humanity is rapidly approaching an exponential “tipping point” of no return. Given this sense of urgency, Hanson and others have warned that fossil fuels need to be phased-out by 2020 if irreversible damage to the earth’s climate and food production systems is to be avoided. The Phoenix Project plan seeks to do exactly that by mass-producing wind-powered hydrogen production systems and simply modifying all the existing vehicles and power plants to use the hydrogen made from the sun, wind and water.

  3. The Phoenix Project: Shifting to a solar hydrogen economy by 2020

    International Nuclear Information System (INIS)

    Braun, H.

    2008-01-01

    The most serious energy, economic and environmental problems are related to the use of fossil and nuclear fuels, which are rapidly diminishing and highly polluting, and many distinguished atmospheric chemists, including Dr. James Hanson at NASA, Dr. Steven Chu, the director of Lawrence Livermore Laboratory, and Professor Ralph Cicerone, president of the National Academy of Sciences have documented that climate changes are now occurring much faster than predicted just a few years ago. The methane hydrates in the oceans and the permafrost in vast areas of the Arctic regions of Siberia, Alaska and Canada are now starting to rapidly melt, and given this could release 50 to 100 times more carbon into the atmosphere than is now generated from the burning of fossil fuels, humanity is rapidly approaching an exponential 'tipping point' of no return. Given this sense of urgency, Hanson and others have warned that fossil fuels need to be phased-out by 2020 if irreversible damage to the earth's climate and food production systems is to be avoided. The Phoenix Project plan seeks to do exactly that by mass-producing wind-powered hydrogen production systems and simply modifying all the existing vehicles and power plants to use the hydrogen made from the sun, wind and water

  4. Atomic power or windmills. [Denmark

    Energy Technology Data Exchange (ETDEWEB)

    Korsbech, U [Danmarks Tekniske Hoejskole, Lyngby

    1976-01-01

    It is argued that if the Danish Ministry of Trade's plans for nuclear power in the nineties are changed to windpower, the price will be 5 times as high. A thorough estimation of the economy of a big Danish windpower program is given.

  5. Economical wind powered bioventing systems successfully applied at remote locations

    International Nuclear Information System (INIS)

    Graves, D.; Wilson, B.; Walker, K.

    1996-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. Several wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests, soil gas composition measurements and measurable pressure changes in the soil indicated that the systems were capable of aerating the soil. Diesel range oil measurements indicated contaminant reductions up to 90% after only two treatments seasons. The results demonstrate the effectiveness of wind-powered biovents. The low cost, low maintenance, and simplicity of the biovents make them a very attractive treatment option for windy, remote sites with unsaturated soil impacted by biodegradable contaminants

  6. Prospects for small and marginal farmers in Trichy district (Tamil Nadu, India) to use water pumping windmills for irrigation

    Energy Technology Data Exchange (ETDEWEB)

    Goedhart, P

    1984-05-01

    The economic, technical, and agricultural aspects of equiping poor farmers in India with wind-powered pumps were analyzed. It is concluded that the prospects for a market for windmills among nontarget group farmers (especially big farmers with diesel pumps) are better than the prospects among the target group farmers. Continuation of the project might lead to an improvement of the situation for the richer farmers, which would in turn lead to a decline in the situation of the original target group of the project, the small and marginal farmers.

  7. 76 FR 41771 - Combined Notice of Filings #1

    Science.gov (United States)

    2011-07-15

    ... Energy Point Beach, LLC, NextEra Energy Power Marketing, LLC, Osceola Windpower, LLC, Osceola Windpower..., LLC, ANP Funding I LLC, Armstrong Energy Limited Partnership, L.L.L.P., Astoria Energy II LLC, Astoria... SUEZ Energy Marketing NA, Inc., Hopewell Cogeneration Ltd Partnership, Hot Spring Power Company, LLC...

  8. 75 FR 13757 - Combined Notice of Filings #1

    Science.gov (United States)

    2010-03-23

    ... Creek Windfarm II LLC; Farmers City Wind, LLC; Flat Rock Windpower LLC; Flat Rock Windpower II LLC; Hay... Power Corporation submits the 2016-2024 Agreement for Sale and Purchase of System Combined Cycle..., 2010. Docket Numbers: ER10-890-000. Applicants: NewCorp Resources Electric Cooperative, Cap Rock Energy...

  9. Mobile Satellite Services - A Survey of Business Needs

    Science.gov (United States)

    1992-01-01

    project. The Delta Clipper could fly either manned or unmanned from the White Sands Missile Range site in New Mexico. The vehicle "would carry 9888 Kg...Robert and Manning , Peter. Handbook of Social Science Methods. 1982, Ballinger Publications Co. 67 CHAPTER U ANALYSIS OF SURUEY Suruegs are an intricate...30303 4. Betz Laboratories 4636 Somerton Rd. Trevose, Pa. 19053 Great Lakes Chemical P 0 Box 2200 West Lafayette, In. 47906 Lubrizol 29400 Lakeland, Blvd

  10. 78 FR 18580 - Combined Notice of Filings #1

    Science.gov (United States)

    2013-03-27

    ... Wind II, LLC, Crystal Lake Wind III, LLC, Day County Wind, LLC, Elk City Wind, LLC, Elk City II Wind... Associates, A Limited Partnership, North Sky River Energy, LLC, Northern Colorado Wind Energy, LLC, Osceola Windpower, LLC, Osceola Windpower II, LLC, Paradise Solar Urban Renewal, L.L.C., Peetz Table Wind Energy...

  11. 78 FR 76608 - Combined Notice of Filings #1

    Science.gov (United States)

    2013-12-18

    ... Windpower LLC. Description: Second Revised MBR to be effective 12/7/2013. Filed Date: 12/6/13. Accession... Canyon Windpower II LLC. Description: Second Revised MBR Tariff to be effective 12/7/2013. Filed Date: 12...-000. Applicants: High Trail Wind Farm, LLC. Description: Second Revised MBR Tariff to be effective 12...

  12. 75 FR 54610 - Combined Notice of Filings #1

    Science.gov (United States)

    2010-09-08

    ... Mountain Power submits tariff filing per 35.12: Rocky Mountain Power MBR Tariff to be effective 8/27/2010... Rock Windpower LLC submits tariff filing per 35.12: Flat Rock Windpower LLC MBR Tariff to be effective... Farm, LLC MBR Tariff to be effective 8/27/ 2010. Filed Date: 08/27/2010. Accession Number: 20100827...

  13. Multi-criteria decision-making in the selection of a renewable energy project in spain: The Vikor method

    International Nuclear Information System (INIS)

    San Cristobal, J.R.

    2011-01-01

    One of the characteristics of the Spanish energy system is its high degree of dependence on imports. In 2005, the Spanish government approved the new Renewable Energy Plan in the following sectors: Windpower, Hydroelectric, Solar Thermal, Solar Thermo-electric, Photovoltaic, Biomass, Biogas and Biofuels. The aim of the Plan is to make it possible to reach the target of 12% of primary energy being met from renewable sources by 2010. When selecting one from various Renewable Energy investment projects different groups of decision-makers become involved in the process. Decision-making has to take into consideration several conflicting objectives because of the increasingly complex social, economic, technological, and environmental factors that are present. Traditional single-criterion decision-making is no longer able to handle these problems. The Compromise Ranking method, also known as the VIKOR method, introduces the Multi-criteria ranking index based on the particular measure of ''closeness'' to the ''ideal'' solution. In this paper, we apply the method in the selection of a Renewable Energy project corresponding to the Renewable Energy Plan launched by the Spanish Government. The method is combined with the Analytical Hierarchy Process method for weighting the importance of the different criteria, which allows decision-makers to assign these values based on their preferences. The results show that the Biomass plant option (Co-combustion in a conventional power plant) is the best choice, followed by the Wind power and Solar Thermo-electric alternatives. (author)

  14. Annual report 1976

    International Nuclear Information System (INIS)

    1977-06-01

    The first ECN activities give not only the financial figures, but in each chapter the background of progress, research and development in 1976. The chapters are: Energy Study Centre with an enlargement of an Office Energy Research Projects, nuclear power stations, the DeBeNeLux Project, nuclear fuel cycle, non-nuclear energy systems, i.e. superconductivity, windpower, magnetohydronamics, energy storage, non-energetic applications of nuclear fission, environmental research, utilization of the Petten research reactors, radiation protection, computer centre organization, radioactive waste disposal, public relations, documentary information, education, man-power and external relations. A list of ECN-publications is included

  15. Pre- and post-construction studies of conflicts between birds and wind turbines in coastal Norway (BirdWind)

    Energy Technology Data Exchange (ETDEWEB)

    Bevanger, K.; Berntsen, F.; Clausen, S.; Dahl, E.L.; Flagstad, Oe.; Follestad, A.; Halley, D.; Hanssen, F.; Hoel, P.L.; Johnsen, L.; Kvaloey, P.; May, R.; Nygaard, T.; Pedersen, H.C.; Reitan, O.; Steinheim, Y.; Vang, R.

    2009-12-15

    The project is named Pre- and post-construction studies of conflicts between birds and wind turbines in coastal Norway (BirdWind). BirdWind is approaching its finalization; with 2010 as the last ordinary year where data-collecting activities takes place. In 2009 the project was significantly strengthened through a new PhD-position. The overall aim of the work conducted by the PhD-student is to model the future white-tailed eagle (WTE) population development based on reproduction and mortality data. Weekly searches with dogs for birds killed within the wind-power plant have been carried out throughout the year; in general searches are conducted every 7 days. 25 'primary turbines' are selected and searched together with one of two dogs. A full search of all turbines is performed at larger intervals. In 2009 31 specimens of at least 8 species have been re-corded. The most frequent victims are willow ptarmigan and WTE with 10 and 7 carcasses, respectively. Of waders 3 common snipes have been recorded. Five carcasses were recorded of hooded crow, and single carcasses of parrot crossbill, northern wheat ear, teal and mallard. Some records from earlier years have been revised as collision victims or not. Also in 2009 censuses for willow ptarmigan have been carried out in spring and autumn on Smoela and Hitra. The preliminary results do not indicate any obvious differences between the two areas, but autumn density in the wind-power plant area seems to be more stable compared to the control area. Interestingly the higher density within the wind-power plant area in autumn is evened out in spring each year, so also in spring 2009. To obtain data on habitat selection, movements, collision risks, survival of eggs, chicks and adults and general population dynamic parameters, willow ptarmigan specimen have been radio-tagged in 2008-2009. The activities regarding breeding waders and small birds (mainly passerines) have this year focused on the EIA-activities on Hitra in

  16. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  17. Transepidermal water loss in cats: comparison of three differently clipped sites to assess the influence of hair coat on transepidermal water loss values.

    Science.gov (United States)

    Momota, Yutaka; Shimada, Kenichiroh; Takami, Akina; Akaogi, Harumi; Takasaki, Mariko; Mimura, Kana; Azakami, Daigo; Ishioka, Katsumi; Nakamura, Yuka; Sako, Toshinori

    2013-08-01

    The measurement of transepidermal water loss (TEWL) is one of the parameters that can be used to assess skin barrier function. The variability and reliability of TEWL measurements in dogs have been controversial, and the hair coat has been considered as one of the factors that may cause variation of TEWL values. The aims of the study were to establish a suitable procedure for measuring feline TEWL, to evaluate the influence of hair coat on TEWL measurements and to assess variations of TEWL at different anatomical sites. Transepidermal water loss was measured using a closed-chamber evaporimeter, the VapoMeter(®). We compared three adjacent sites in the groin area of 10 clinically normal, domestic short hair cats. One site was unclipped, the second was trimmed with scissors and the third was shaved using electric clippers. Values of TEWL were obtained for 48 h after trimming with scissors and clippers. Five sites were clipped (upper back, lumbar back, lateral thigh, axillae and groin), and the TEWL was measured. The mean and SD of TEWL values of the clipper-trimmed site were the smallest, followed in order by the site trimmed with scissors and the unclipped site. The TEWL values were statistically constant in the clipper-trimmed site, while the values in the unclipped sites were not. There was no statistically significant difference in TEWL values between all of the anatomical sites except for the axillae. Hair clipping of sites with electric clippers is recommended for TEWL measurement in cats. © 2013 ESVD and ACVD.

  18. 77 FR 64503 - Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2012-10-22

    ... Wholesale Generator Status Docket Nos. A V Solar Ranch 1, LLC EG12-83-000 Spion Kop Wind, LLC EG12-84-000... Windpower IA, LLC EG12-87-000 Los Vientos Windpower IB, LLC EG12-88-000 Mehoopany Wind Energy LLC EG12-89-000 Russell City Energy Company, LLC........ EG12-90-000 Zephyr Wind, LLC EG12-91-000 Beebe Renewable...

  19. Wind power systems for individual applications. [electric power supplies for homes

    Science.gov (United States)

    Clews, H. M.

    1973-01-01

    A small windpower system is described which is suitable for electrifying a house. The self-contained unit consists of a two kilowatt wind driven generator, a set of 19 storage batteries, a small dc to ac inverter, and a gasoline generator for use as an emergency backup system in case of prolonged calm periods. Cost effectiveness of the electricity generated by this windmill system comes out to about 15 cents per kilowatt hour - assuming a 10 year life for the batteries and a 20 year life for the other components. Some other small windpower systems are also described, and it is shown that a windpowered generator in the 15- to 25-kilowatt output range coupled to a direct heated water storage system is able to heat a typical New England home.

  20. Novel Low Cost, High Reliability Wind Turbine Drivetrain

    Energy Technology Data Exchange (ETDEWEB)

    Chobot, Anthony; Das, Debarshi; Mayer, Tyler; Markey, Zach; Martinson, Tim; Reeve, Hayden; Attridge, Paul; El-Wardany, Tahany

    2012-09-13

    Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of

  1. Trade winds turn on the lights - wind home systems in action

    International Nuclear Information System (INIS)

    Kruse, A.

    1998-01-01

    This article reports on the use of a micro wind turbine designed for domestic use in a house in the Enriquillo village in the Dominican Republic which is in the path of the trade winds. The use of wind home systems for rural electrification, installation of similar systems in the north of the country following the success of the Enriquillo system, the shipping of the windpower kits minus the towers which are to be built locally, and the micro-financing of the project are discussed

  2. Application and performance of remote bioventing systems powered by wind

    International Nuclear Information System (INIS)

    Graves, D.; Hague, K.; Wilson, B.; Dillon, T. Jr.; Klein, J.; McLaughlin, J.; Olson, G.

    1995-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. A 12-in. attic turbine in a 10-mph wind was found to generate 0.025 in. of water vacuum with an airflow of approximately 2.5 ft 3 per min. Two wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests and soil gas composition measurements indicated that the systems were capable of aerating the soil. Measurements of diesel-range organics (DRO) taken during installation and at the end of the treatment season show concentration reductions of 29 and 87% at the two sites

  3. The surgical care improvement project and prevention of post-operative infection, including surgical site infection.

    Science.gov (United States)

    Rosenberger, Laura H; Politano, Amani D; Sawyer, Robert G

    2011-06-01

    In response to inconsistent compliance with infection prevention measures, the Centers for Medicare & Medicaid Services collaborated with the U.S. Centers for Disease Control and Prevention on the Surgical Infection Prevention (SIP) project, introduced in 2002. Quality improvement measures were developed to standardize processes to increase compliance. In 2006, the Surgical Care Improvement Project (SCIP) developed out of the SIP project and its process measures. These initiatives, published in the Specifications Manual for National Inpatient Quality Measures, outline process and outcome measures. This continually evolving manual is intended to provide standard quality measures to unify documentation and track standards of care. Seven of the SCIP initiatives apply to the peri-operative period: Prophylactic antibiotics should be received within 1 h prior to surgical incision (1), be selected for activity against the most probable antimicrobial contaminants (2), and be discontinued within 24 h after the surgery end-time (3); (4) euglycemia should be maintained, with well-controlled morning blood glucose concentrations on the first two post-operative days, especially in cardiac surgery patients; (6) hair at the surgical site should be removed with clippers or by depilatory methods, not with a blade; (9) urinary catheters are to be removed within the first two post-operative days; and (10) normothermia should be maintained peri-operatively. There is strong evidence that implementation of protocols that standardize practices reduce the risk of surgical infection. The SCIP initiative targets complications that account for a significant portion of preventable morbidity as well as cost. One of the goals of the SCIP guidelines was a 25% reduction in the incidence of surgical site infections from implementation through 2010. Process measures are becoming routine, and as we practice more evidence-based medicine, it falls to us, the surgeons and scientists, to be active

  4. Real profitability

    International Nuclear Information System (INIS)

    Vizcaino, F.R.

    1996-01-01

    The purpose of this paper is to present an analysis of SOCIEDAD EOLICA de ANDALUCIA, S.A., a company dedicated to electric power production using wind resources at its 30MW wind power plant, which includes 250 wind turbines of 100, 150 and 180 KW. At the time of its construction the company has been Europe's largest windpower plant. Now this fiscal year 1995, having completed 3 years of production of windpower, we have obtained benefits of 70 millions of pesetas after taxes. (author)

  5. Windpower and grey seals: An impact assessment of potential effects by sea-based windpower plants in a local seal population

    International Nuclear Information System (INIS)

    Sundberg, Jan; Soederman, Malin

    2000-05-01

    The impact of five sea-based wind power plants on two haulout sites for grey seals on southwestern Gotland, in the Baltic Sea, was analysed. Data on seal numbers was collected on a regular basis during the initial stages of the project from summer 1996, continuing during the building (autumn 1997) and running of the wind power plants (from spring 1998) until the end of June 1999. Additional observational data from earlier years was also available. Indications of lower occurrence and reduced number of seals in the area was found during periods of time in 1997 and 1998, times of construction and active running of the plants. However, no evidence on the wind power plants, per se, affecting the grey seals was found. Instead, several weather factors were found to affect the number of seals in the area, and periods of low occurrence and number of seals were more likely explained by i.e. unfavourable water levels and hard wind from certain directions. One important, short term, impact factor was however found. Human induced disturbances such as boat and helicopter traffic, some which were directly related to maintenance of the wind power plants, temporarily reduced number of seals and made them more restless. Disturbance thus constitutes a potential threat to seals. A shift from one to the other of the two haulout sites was also noted, a shift which likely is due to disturbances. Future guidelines are given, including some restrictions in movements near the haulout sites. Continued observations and studies are suggested if more off-shore wind power plants will be raised in the area. A call for more stringent use of environmental impact assessments is thus made. Also, suggestions on measures to be taken in order to reduce the effect of human related disturbances are made. In order to create sustainable conditions for a continued population of seals in the area and in order to create opportunities for a reestablishment of the grey seal in the southern Baltic region

  6. Windpower and grey seals: An impact assessment of potential effects by sea-based windpower plants in a local seal population

    Energy Technology Data Exchange (ETDEWEB)

    Sundberg, Jan; Soederman, Malin [Uppsala Univ. (Sweden). Dept. of Animal Ecology

    2000-05-01

    The impact of five sea-based wind power plants on two haulout sites for grey seals on southwestern Gotland, in the Baltic Sea, was analysed. Data on seal numbers was collected on a regular basis during the initial stages of the project from summer 1996, continuing during the building (autumn 1997) and running of the wind power plants (from spring 1998) until the end of June 1999. Additional observational data from earlier years was also available. Indications of lower occurrence and reduced number of seals in the area was found during periods of time in 1997 and 1998, times of construction and active running of the plants. However, no evidence on the wind power plants, per se, affecting the grey seals was found. Instead, several weather factors were found to affect the number of seals in the area, and periods of low occurrence and number of seals were more likely explained by i.e. unfavourable water levels and hard wind from certain directions. One important, short term, impact factor was however found. Human induced disturbances such as boat and helicopter traffic, some which were directly related to maintenance of the wind power plants, temporarily reduced number of seals and made them more restless. Disturbance thus constitutes a potential threat to seals. A shift from one to the other of the two haulout sites was also noted, a shift which likely is due to disturbances. Future guidelines are given, including some restrictions in movements near the haulout sites. Continued observations and studies are suggested if more off-shore wind power plants will be raised in the area. A call for more stringent use of environmental impact assessments is thus made. Also, suggestions on measures to be taken in order to reduce the effect of human related disturbances are made. In order to create sustainable conditions for a continued population of seals in the area and in order to create opportunities for a reestablishment of the grey seal in the southern Baltic region

  7. Aerodynamics of Reentry Vehicle Clipper at Descent Phase

    Science.gov (United States)

    Semenov, Yu. P.; Reshetin, A. G.; Dyadkin, A. A.; Petrov, N. K.; Simakova, T. V.; Tokarev, V. A.

    2005-02-01

    Mars.. Logistics spacecraft Progress have been flying regularly since 1978. The tasks of these unmanned spacecraft include supplying the space station with all the necessities for long-duration missions, such as propellant for the space station propulsion system, crew life support consumables, scientific equipment for conducting experiments. Various modifications of the spacecraft have expanded the space station capabilities. 1988 saw the first, and, much to our regret, the last flight of the reusable orbiter Buran.. Buran could deliver to orbit up to 30 tons of cargo, return 20 tons to Earth and have a crew of up to 10. However, due to our country's economic situation the project was suspended.

  8. Evaluating potentials for future generation off-shore wind-power outside Norway

    Science.gov (United States)

    Benestad, R. E.; Haugen, J.; Haakenstad, H.

    2012-12-01

    With todays critical need of renewable energy sources, it is naturally to look towards wind power. With the long coast of Norway, there is a large potential for wind farms offshore Norway. Although there are more challenges with offshore wind energy installations compared to wind farms on land, the offshore wind is generally higher, and there is also higher persistence of wind speed values in the power generating classes. I planning offshore wind farms, there is a need of evaluation of the wind resources, the wind climatology and possible future changes. In this aspect, we use data from regional climate model runs performed in the European ENSEMBLE-project (van der Linden and J.F.B. Mitchell, 2009). In spite of increased reliability in RCMs in the recent years, the simulations still suffer from systematic model errors, therefore the data has to be corrected before using them in wind resource analyses. In correcting the wind speeds from the RCMs, we will use wind speeds from a Norwegian high resolution wind- and wave- archive, NORA10 (Reistad et al 2010), to do quantile mapping (Themeβl et. al. 2012). The quantile mapping is performed individually for each regional simulation driven by ERA40-reanalysis from the ENSEMBLE-project corrected against NORA10. The same calibration is then used to the belonging regional climate scenario. The calibration is done for each grid cell in the domain and for each day of the year centered in a +/-15 day window to make an empirical cumulative density function for each day of the year. The quantile mapping of the scenarios provide us with a new wind speed data set for the future, more correct compared to the raw ENSEMBLE scenarios. References: Reistad M., Ø. Breivik, H. Haakenstad, O. J. Aarnes, B. R. Furevik and J-R Bidlo, 2010, A high-resolution hindcast of wind and waves for The North Sea, The Norwegian Sea and The Barents Sea. J. Geophys. Res., 116. doi:10.1029/2010JC006402. Themessl M. J., A. Gobiet and A. Leuprecht, 2012

  9. The environmental impacts of windpower development in Vermont: A policy analyses

    Energy Technology Data Exchange (ETDEWEB)

    Goodman, N. [Univ. of Vermont, Burlington, CT (United States)

    1997-12-31

    In the spring of 1996, construction of a six-megawatt wind power facility commenced on a mountain ridge in the town of Searsburgh in southern Vermont. While this process marked the beginning of physical development on the ridge, Green Mountain Power Corporation (GMP) had been planning the process for over 25 years. From wind speed data collection in 1971, to site selection, and environmental studies still ongoing, GMP has sought to increase their renewable energy portfolio by bringing wind power to the state of Vermont. While on the surface, wind power appears to be relatively pollution free, producing no emissions, it should be noted that there are environmental impacts associated with wind power and these would have to be addressed before any substantial development could occur. But how would this happen in Vermont? Power generating facilities are not subject to the Act 250 process; rather they require certification from the Public Service Board (P.S.B.). As the project progressed, questions arose over just how the process would adequately address the environmental impacts associated with developing a remote ridge in southern Vermont. In preparing for and participating in the certification process, GMP identified several environmental impact issues in need of investigation. GMP initiated studies in several fields and hired consultants to investigate these issues with the hope that they would not serve as an impediment to their project. Preliminary analysis revealed the need for in-depth studies in four specific impact areas, including aesthetics, critical wildlife habitat, noise and avian studies. While all participants in the process do not share the same concerns, different stakeholders have raised enough questions to justify a critical look at the certification process.

  10. Estimating wind-turbine-caused bird and bat fatality when zero carcasses are observed

    Science.gov (United States)

    Huso, Manuela M.P.; Dalthorp, Daniel; Dail, David; Madsen, Lisa

    2015-01-01

    Many wind-power facilities in the United States have established effective monitoring programs to determine turbine-caused fatality rates of birds and bats, but estimating the number of fatalities of rare species poses special difficulties. The loss of even small numbers of individuals may adversely affect fragile populations, but typically, few (if any) carcasses are observed during monitoring. If monitoring design results in only a small proportion of carcasses detected, then finding zero carcasses may give little assurance that the number of actual fatalities is small. Fatality monitoring at wind-power facilities commonly involves conducting experiments to estimate the probability (g) an individual will be observed, accounting for the possibilities that it falls in an unsearched area, is scavenged prior to detection, or remains undetected even when present. When g  ~0.45. Further, we develop extensions for temporal replication that can inform prior distributions of M and methods for combining information across several areas or time periods. We apply the method to data collected at a wind-power facility where scheduled searches yielded X = 0 raptor carcasses

  11. Estimating wind-turbine-caused bird and bat fatality when zero carcasses are observed.

    Science.gov (United States)

    Huso, Manuela M P; Dalthorp, Dan; Dail, David; Madsen, Lisa

    2015-07-01

    Many wind-power facilities in the United States have established effective monitoring programs to determine turbine-caused fatality rates of birds and bats, but estimating the number of fatalities of rare species poses special difficulties. The loss of even small numbers of individuals may adversely affect fragile populations, but typically, few (if any) carcasses are observed during monitoring. If monitoring design results in only a small proportion of carcasses detected, then finding zero carcasses may give little assurance that the number of actual fatalities is small. Fatality monitoring at wind-power facilities commonly involves conducting experiments to estimate the probability (g) an individual will be observed, accounting for the possibilities that it falls in an unsearched area, is scavenged prior to detection, or remains undetected even when present. When g -0.45. Further, we develop extensions for temporal replication that can inform prior distributions of M and methods for combining information across several areas or time periods. We apply the method to data collected at a wind-power facility where scheduled searches yielded X = 0 raptor carcasses.

  12. Changing wind-power landscapes

    DEFF Research Database (Denmark)

    Möller, Bernd

    2006-01-01

    of determining the likely visual-impact on landscapes and population, taking into account that there is no clear threshold for perceived adverse visual-impact. A geographical information system (GIS) has been used to build a regional landscape model for Northern Jutland County, which is used to assess visibility...

  13. Wind-powered aqueduct systems

    Energy Technology Data Exchange (ETDEWEB)

    Eldridge, F R; Ljungstroem, O [ed.

    1976-01-01

    The MITRE Corporation is proposing to develop a preliminarydesign for a system that would use large-scale wind-driven units to provide power for the pumping of water from the main reservoir to auxiliary reservoirs in other parts of an aqueduct system. The study would include a comparison of the cost and effectiveness of alternative methods of performing such operations.

  14. Alliance created to study wind-generated power potential

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Wind-generated power may get a boost from a new consortium of companies that have joined together to expand the potential across the country for this cheap, renewable energy source. Niagara Mohawk Power Corporation has announced that it will join with the Pacific Gas and Electric Company (PG ampersand E), the Electric Power Research Institute (EPRI) and US Windpower, Inc., in developing an advanced, 33-meter, variable-speed wind turbine that reduced the cost and improves the power quality of wind energy. The majority of the estimated $20 million cost will be provided by US Windpower

  15. Community Wind: Once Again Pushing the Envelope of Project Finance

    Energy Technology Data Exchange (ETDEWEB)

    bolinger, Mark A.

    2011-01-18

    In the United States, the 'community wind' sector - loosely defined here as consisting of relatively small utility-scale wind power projects that sell power on the wholesale market and that are developed and owned primarily by local investors - has historically served as a 'test bed' or 'proving grounds' for up-and-coming wind turbine manufacturers that are trying to break into the U.S. wind power market. For example, community wind projects - and primarily those located in the state of Minnesota - have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010), Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Thus far, one of these turbine manufacturers - Suzlon - has subsequently achieved some success in the broader U.S. wind market as well. Just as it has provided a proving grounds for new turbines, so too has the community wind sector served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the special allocation partnership flip structure (see Figure 1 in Section 2.1) - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adopted by the broader wind market. More recently, a handful of community wind projects built over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures involving strategic tax equity investors. These include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure

  16. Feasibility of wind power integration in weak grids in non-coastal areas of sub-saharan Africa: the case of Mali

    Directory of Open Access Journals (Sweden)

    Ivan Nygaard

    2017-05-01

    Full Text Available Installed wind capacity in Africa has grown rapidly the last few years, and by late 2016 had reached about 4.8 GW. However, so far few investments have been made in inland localities due to the generally lower wind potential. This paper therefore explores if and to what extent it is possible to establish economically feasible wind-power plants in countries with lower wind potential. To address this question, the paper provides a combined wind resource mapping and a pre-feasibility study for grid integration of wind power at four specific sites in Mali. The study finds that Mali has generally poor wind conditions, with average wind speeds of below 5 m/s at 50 m above ground level in the south, while there are larger areas in the northern part with average wind speeds of above 7 m/s at 50 m above ground level. Overall the research shows that in countries with generally poor wind conditions, such as in the southern part of Mali, it is possible to identify a limited number of sites with local speed-up effects situated close to the existing grid, at which there are options for undertaking medium-size wind-power projects that would be economically feasible at current crude oil prices of 50 USD/barrel.

  17. One last boom : Alberta's rapidly expanding oil mines may be the largest and messiest industrial projects in Canadian history

    International Nuclear Information System (INIS)

    Laird, G.

    2001-01-01

    The bitumen deposits of Alberta, 2.5 trillion barrels of oil, of which 300 billion are considered recoverable, represent the greatest single petroleum resources of the world, based on surface and subsurface calculations. Four deposits, covering an area the size of New Brunswick, are located in the area stretching from Cold Lake to Lloydminster (east of Edmonton), the upper reaches of the Athabasca River east to the Peace River. The largest by far is the Athabasca deposit in the vicinity of Fort McMurray, spread over 4.3 million hectares. The deposit is at the centre of the biggest industrial expansion witnessed by the province. Since 1996, 38 billion dollars worth of new projects have been announced. It is estimated that by 2025, the bulk of the national oil production will originate from open-pit mines and underground wells around Fort McMurray. This oil boom has economic benefits for the population, from welders to real estate agents to stakeholders. The environmental effects are not as beneficial. Huge strip mines are being carved next to the Athabasca River, with great amounts of greenhouse gases emissions. The Suncor and Syncrude oil-sands plants combined represent the fourth largest carbon dioxide emission source in Canada. The development of these projects dramatically affects global warming. The nitrogen and sulphur emissions could also acidify lakes and soil in the region. The Suncor mine resulted from the first boom to hit Fort McMurray in 1964. The Syncrude mine is the result of the second boom which took place in 1973. In 1996, Suncor installed a sulphur scrubber system that removes 95 per cent of sulphur dioxide from the electricity and steam-generation plant. Suncor also invested in various projects, such as wind-power, rainforest cultivation and biomass generation. The volume of pollution increases as the operations expand, even if operations are cleaner. If no new gains in pollution control are achieved, it is expected that by 2015, the total

  18. TRACER - TRACING AND CONTROL OF ENGINEERING REQUIREMENTS

    Science.gov (United States)

    Turner, P. R.

    1994-01-01

    TRACER (Tracing and Control of Engineering Requirements) is a database/word processing system created to document and maintain the order of both requirements and descriptive material associated with an engineering project. A set of hierarchical documents are normally generated for a project whereby the requirements of the higher level documents levy requirements on the same level or lower level documents. Traditionally, the requirements are handled almost entirely by manual paper methods. The problem with a typical paper system, however, is that requirements written and changed continuously in different areas lead to misunderstandings and noncompliance. The purpose of TRACER is to automate the capture, tracing, reviewing, and managing of requirements for an engineering project. The engineering project still requires communications, negotiations, interactions, and iterations among people and organizations, but TRACER promotes succinct and precise identification and treatment of real requirements separate from the descriptive prose in a document. TRACER permits the documentation of an engineering project's requirements and progress in a logical, controllable, traceable manner. TRACER's attributes include the presentation of current requirements and status from any linked computer terminal and the ability to differentiate headers and descriptive material from the requirements. Related requirements can be linked and traced. The program also enables portions of documents to be printed, individual approval and release of requirements, and the tracing of requirements down into the equipment specification. Requirement "links" can be made "pending" and invisible to others until the pending link is made "binding". Individuals affected by linked requirements can be notified of significant changes with acknowledgement of the changes required. An unlimited number of documents can be created for a project and an ASCII import feature permits existing documents to be incorporated

  19. Windpower `96 opening session remarks

    Energy Technology Data Exchange (ETDEWEB)

    Ervin, C.A.

    1996-12-31

    Opinions on political factors affecting the U.S. market for wind power are presented in this paper. The position of the Assistant Secretary of the Energy Efficiency and Renewable Energy Division of the U.S. Department of Energy is stated. Political aspects of renewable energy sources are reviewed. The link between clean energy sources and a clean environment is discussed. The role of the Federal Government in promoting clean energy sources is also discussed.

  20. 77 FR 66457 - Combined Notice of Filings #2

    Science.gov (United States)

    2012-11-05

    ...: Arizona Public Service Company. Description: WAPA Bouse Switchyard Construction Agreement, Rate Schedule..., Casselman Windpower LLC, Colorado Green Holdings LLC, Dillon Wind LLC, Dry Lake Wind Power, LLC, Dry Lake...

  1. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  2. Pandivere kõrgustikule tuulepargid sobivad / Alan Senkel, Jaan Tepp ; interv. Raivo Raigna

    Index Scriptorium Estoniae

    Senkel, Alan

    2008-01-01

    Windpower Eesti OÜ juhatuse liige Alan Senkel ja Eesti Tuuleenergia Assotsiatsiooni esimees Jaan Tepp tuuleenergia kasutamisest Eestis. Vt. samas: Raivo Raigna. Kullengale tuulegeneraatorite rajamine kütab kohalike elanike kirgi

  3. 75 FR 71116 - Combined Notice of Filings # 1

    Science.gov (United States)

    2010-11-22

    ...; North Allegheny Wind, LLC; Silver Sage Windpower, LLC; St. Paul Cogeneration, LLC; Three Buttes... LLC; Moraine Wind II LLC; Mountain View Power Partners III, LLC; Pebble Springs Wind LLC; Providence...

  4. Applications of the use of the renewable energies, solar power and wind power, for the securing of hydrogen, as power supply of the fuel cells; Obtencion de hidrogeno, a partir de la electrolisis del agua mediante energias renovables almacenamiento y aplicaciones

    Energy Technology Data Exchange (ETDEWEB)

    San Martin, J. J.; Martin, I.; Aperribay, V.; San Martin, J. I.; Arrieta, J. M.; Zuazua, J.; Romero, E.

    2004-07-01

    The object of the presented communication is to show the applications of the use of the renewable energies, particularly the solar power and the wind power, for the securing of hydrogen, as power supply of the fuel cells. The electrical energy produced in the solar badges and in the windpowers is, principally, injected into the electrical networks, for his transport, distribution and consumption, if the network the demand. The novel aspect is, that if the network does not demand potency, this one is transformed into hydrogen at the same photovoltaic station or into the base of the tower of the windpower and, later, stored to feed the fuel cells, not producing to him any type of element pollutant, since the residual element is the water. (Author)

  5. sizing of wind powered axial flux permanent magnet alternator using

    African Journals Online (AJOL)

    user

    2016-10-04

    Oct 4, 2016 ... Keywords: Wind-Power, Axial flux, Axial Flux Permanent Machines (AFPM), Axial Flux Permanent Magnet ... energy for power generation, a high constraint is the .... arrangements as Single-Rotor Single-Stator Structure.

  6. Development of a decision support system for setting up a wind energy policy across the Walloon Region (southern Belgium)

    Energy Technology Data Exchange (ETDEWEB)

    Lejeune, P. [Unit of Forest and Nature Management, Gembloux Agricultural University, 2, Passage des Deportes, B-5030 Gembloux (Belgium); Feltz, C. [Unit of Soil, Ecology and Territory, Gembloux Agricultural University, 2, Passage des Deportes, B-5030 Gembloux (Belgium)

    2008-11-15

    Wallonia (the region covering southern Belgium) is committed to making a significant increase in its wind-powered electricity production capacity by 2010. Therefore, a decision support system designed to evaluate and map environmental and landscape constraints fundamental to the building of wind farms was developed for the whole Walloon Region (17,000 km{sup 2}). This system is a geodatabase using 40 criteria (landscape or environmental) corresponding to three constraint levels (exclusion, highly sensitive and sensitive). This geodatabase also has analysis functions developed in the ArcGIS 9 software environment that are used to update the overall constraints map, to analyse sensitivity with respect to constraint criteria-defining parameters as well as to perform full diagnostic studies on wind farm projects. (author)

  7. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  8. Likely market-penetrations of renewable-energy technologies

    International Nuclear Information System (INIS)

    Probert, S.D.; Mackay, R.M.

    1998-01-01

    The learning-curve concept is considered to be an important tool for predicting the future costs of renewable-energy technology systems. This paper sets out the underlying rationale for learning-curve theory and the potential for its application to renewable technologies, such as photovoltaic-module and wind-power generator technologies. An indication of the data requirements for carrying out learning-curve projections is given together with an assessment of the requirements necessary for an analysis to be undertaken of the application of learning curves to other renewable-energy technologies. The paper includes a cost comparison and a figure-of-merit criterion applicable to photovoltaic-module and wind-power-turbine technologies. (Copyright (c) 1998 Elsevier Science B.V., Amsterdam. All rights reserved.)

  9. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Windkraftanlagen in der Schweiz. Checkliste fuer Investoren von Grossanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  10. International Travel: Tips for Staying Healthy

    Science.gov (United States)

    ... sickness (promethazine and acetazolamide). Scissors, tweezers, nail clippers, pocket knife, thermometer, and a mirror. Hand wipes and ... counter Products Procedures & Devices Prescription Medicines Health Tools Dictionary Symptom Checker BMI Calculator myhealthfinder Immunization Schedules Nutrient ...

  11. Wind power as an electrical energy source in Illinois

    Science.gov (United States)

    Wendland, W. M.

    1982-03-01

    A preliminary estimate of the total wind power available in Illinois was made using available historical data, and projections of cost savings due to the presence of wind-generated electricity were attempted. Wind data at 10 m height were considered from nine different sites in the state, with three years data nominally being included. Wind-speed frequency histograms were developed for day and night periods, using a power law function to extrapolate the 10 m readings to 20 m. Wind speeds over the whole state were found to average over 8 mph, the cut-in point for most wind turbines, for from 40-63% of the time. A maximum of 75% run-time was determined for daylight hours in April-May. A reference 1.8 kW windpowered generator was used in annual demand projections for a reference one family home, using the frequency histograms. The small generator was projected to fulfill from 25-53% of the annual load, and, based on various cost assumptions, exhibited paybacks taking from 14-27 yr.

  12. Wind power - An impulse or just frustration for business?

    International Nuclear Information System (INIS)

    Wellstein, J.

    2005-01-01

    This article deals with the question raised as to whether the development of wind power can provide an impulse for industry. The answers provided by Markus Geissmann from the Swiss Federal Office of Energy (SFOE) and Robert Horbaty, head of 'Suisse Eole' - a Swiss society that supports the use of wind energy - are presented in the form of an interview. In particular, the fact that certain Swiss manufacturers have established themselves in the international wind energy market is discussed - in spite of the relatively low proportion of wind energy actually generated in Switzerland. The various factors influencing both on-shore and off-shore wind-power installations are discussed. The products and services offered are discussed and also the up-and-coming market for the replacement of older wind-power installations is looked at

  13. Optimal Non-Coplanar Launch to Quick Rendezvous

    National Research Council Canada - National Science Library

    Sears, Gregory

    1997-01-01

    The purpose of this study was to determine the feasibility of launching a Delta Clipper-like vehicle on an optimal, non-coplanar trajectory to rendezvous with an earth orbiting object in one orbit or less...

  14. Energy installation implementation to the proof of law: the example of renewable marine energy

    International Nuclear Information System (INIS)

    Bonis, Anne

    2013-01-01

    The first renewable marine energy projects were first presented during the so called Eole program in 1996, and then during a call for bids on offshore wind-power in 2004. Despite these initiatives and a second call for bids in 2011, only a few prototypes are being tested at the beginning of 2013. This study aims to determine if the French legislation is adapted to this emerging new activity of renewable marine energy installation implementation. The results of three-year research show that several advances have contributed to defining a legal framework favorable to the implementation of renewable marine energy production installation; yet, their legal regime has not been finalized. Nevertheless, a comparison with maritime and coastal legislations reveals solutions are worth considering and possible. As a result, an intervention from legislative or parliamentary authorities seems necessary to simplify the implementation of projects and to limit the risks of legal disputes [fr

  15. Funding stalls ARETS work

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The current status of the Lethbridge Alberta Renewable Energy Test Site (ARETS) was described, following the Alberta Energy Department's failure to respond to the funding application of the Test Site. This forced the facility to be inactive for its 1997 field season. The site was established in 1982 to evaluate and demonstrate wind turbines for water pumping. It now includes solar and deep well pumping systems, and also wind-powered aeration. Up to now the site has been jointly financed by Alberta Energy and Natural Resources Canada. Both departments wanted ARETS to put more emphasis on research and development and on helping manufacturers commercialize their ideas. Despite the inactivity during the 1997 field season, one small project managed to continue, i.e., the wind project involving testing the new Delta Junior water-pumper by Dutch Industries. The Centre will also be working on a new submersible pump and DC motor system. For long-term survival, the Centre needs the support of its major financial backers. 1 fig

  16. Washington Windplant No. 1: Botanical resources field survey. Appendix B to Washington Windplant No. 1 EIS

    International Nuclear Information System (INIS)

    1994-12-01

    KENETECH Windpower, Inc., has applied to Klickitat County for a conditional use permit to construct and operate a 115 Megawatt windfarm on an approximately 5110 hectare (12,630 acre) site in the Columbia Hills near Goldendale, Washington. A transmission services agreement between the Bonneville Power Administration (BPA) and utilities purchasing the Project's output will also be required. Klickitat County and BPA initiated the preparation of a joint SEPA/NEPA Environmental Impact Statement, under the authority of the Washington State Environmental Policy Act and the National Environmental Policy Act. The EIS addresses, among other issues, the Project's potential impact on rare, threatened or endangered, and sensitive plant species and communities as well as plant species of potential cultural importance. A field survey along potential impact corridors (turbine strings, roadways, and the transmission line alignment) was conducted between April and June, 1994 in order to identify rare plant species, high-quality native plant communities, and plant species of potential cultural importance present in these corridors. In addition, habitat maps of the entire 5110-ha project area were field verified. This report contains the results of that survey and an assessment of the potential project impacts

  17. 76 FR 17120 - Supplemental Notice Requesting Comments

    Science.gov (United States)

    2011-03-28

    ... Wind VII, LLC Alta Wind VIII, LLC Alta Windpower Development, LLC TGP Development Company, LLC Puget Sound Energy, Inc EL10-72-001 Terra-Gen Dixie Valley, LLC, TGP Dixie EL10-29-002 Development Company...

  18. 76 FR 14966 - Supplemental Notice of Technical Conference

    Science.gov (United States)

    2011-03-18

    ... Alta Wind VII, LLC Alta Wind VIII, LLC Alta Windpower Development, LLC... TGP Development Company, LLC...... Puget Sound Energy, Inc EL10-72-001. Terra-Gen Dixie Valley, LLC, TGP Dixie EL10-29-002. Development...

  19. PERFORMANCE ANALYSIS OF METHODS FOR ESTIMATING ...

    African Journals Online (AJOL)

    2014-12-31

    Dec 31, 2014 ... speed is the most significant parameter of the wind energy. ... wind-powered generators and applied to estimate potential power output at various ...... Wind and Solar Power Systems, U.S. Merchant Marine Academy Kings.

  20. Wind data for wind driven plant. [site selection for optimal performance

    Science.gov (United States)

    Stodhart, A. H.

    1973-01-01

    Simple, averaged wind velocity data provide information on energy availability, facilitate generator site selection and enable appropriate operating ranges to be established for windpowered plants. They also provide a basis for the prediction of extreme wind speeds.

  1. Genetic Variability in Barley (Hordeum vulgare l.) Landraces from ...

    African Journals Online (AJOL)

    segregating progenies with maximum genetic variability for selection. .... cultivar Clipper applied in slots of the first two, the tenth, and the last ... solution (50 ml glacial acetic acid, 200 ml methanol and 250 ml distilled water) ...... Adelaide, South.

  2. Comparative study of the performance of semiconductor laser based coherent Doppler lidars

    DEFF Research Database (Denmark)

    Rodrigo, Peter John; Pedersen, Christian

    2012-01-01

    Coherent Doppler Lidars (CDLs), operating at an eye-safe 1.5-micron wavelength, have found promising applications in the optimization of wind-power production. To meet the wind-energy sector's impending demand for more cost-efficient industrial sensors, we have focused on the development of conti......Coherent Doppler Lidars (CDLs), operating at an eye-safe 1.5-micron wavelength, have found promising applications in the optimization of wind-power production. To meet the wind-energy sector's impending demand for more cost-efficient industrial sensors, we have focused on the development...... of continuous-wave CDL systems using compact, inexpensive semiconductor laser (SL) sources. In this work, we compare the performance of two candidate emitters for an allsemiconductor CDL system: (1) a monolithic master-oscillator-power-amplifier (MOPA) SL and (2) an external-cavity tapered diode laser (ECTDL)....

  3. statistical analysis of wind speed for electrical power generation

    African Journals Online (AJOL)

    HOD

    sites are suitable for the generation of electrical energy. Also, the results ... Nigerian Journal of Technology (NIJOTECH). Vol. 36, No. ... parameter in the wind-power generation system. ..... [3] A. Zaharim, A. M Razali, R. Z Abidin, and K Sopian,.

  4. Nate Blair | NREL

    Science.gov (United States)

    solar water-heating experience Research Interests Macroeconomic energy-impact analysis Wind-power market Experience Intern, Global Energy Partners, LLC (June 2001-August 2001) Intern, Sandia National Lab American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Featured Publications

  5. Is windpower ready to take off

    Energy Technology Data Exchange (ETDEWEB)

    Stansell, J

    1975-10-10

    A review is presented of wind power research world-wide. In the USA an $80 mill programme is underway aimed at building a 1 MW prototype electricity generating plant; a 100 kW unit is entering the testing stage at Plumbrook. Developments elsewhere are described.

  6. East and Central African Journal of Pharmaceutical Sciences An ...

    African Journals Online (AJOL)

    An Approach to Effective Disinfection of Salon Items [clippers, combs and scissors]. O.S. OLONITOLA'*, P.F. OLURINOLA~ ... 2~epartment of Pharmaceutics and Pharmaceutical Microbiology, Faculty of Pharmaceutical. Sciences, Ahmadu Bello ... antimicrobial products with increased value over those currently available.

  7. Wind power a victim of policy and politics

    International Nuclear Information System (INIS)

    Jaureguy-Naudin, M.

    2010-01-01

    In December 2008, as part of the fight against climate change, the European Union adopted the Energy and Climate package that endorsed three objectives toward 2020: a 20% increase in energy efficiency, a 20% reduction in GHG emissions (compared to 1990), and a 20% share of renewables in final energy consumption. Responsible for about 40% of European energy-related emissions, the power sector is key to the realization of these objectives. However, the inertia inherent in this sector highlights the importance of ensuring that public authorities and market incentives, whether to expand or replace capacity, establish an appropriate environment that will trigger low-carbon investments. Power plants built today have a lifetime of 30 to 60 years. Many options are available to de-carbonize the power sector: fuel shifting from coal to less-emitting energy sources, development of carbon capture and storage facilities, improvement of electricity end-use, and greater use of nuclear-power generation and renewable energy sources. In the EU, renewable energy sources amounted to 8.2% in primary energy consumption in 2008, of which 66.1% came from biomass, 21.2% from hydro and 6.9% from wind. To raise this number (8.2%) to 20%, individual targets are set for each member state. EU countries are free to decide their own preferred mix of renewables, allowing them to split the burden across three sectors: electricity, heating/cooling, and transport. Renewables in electricity generation are expected to grow to around 33% to meet the objective set by the European Commission, up from 16.3% in 2009. Since wind-power technology has matured and hydropower has limited additional potential due to geographical constraints, wind energy is expected to provide most of the extra renewable energy required in electricity generation to meet the objective. The share of wind power in EU 27 electricity production was 4.2% in 2008. This paper examines the main challenges facing the development of large

  8. Facility Interface Capability Assessment (FICA) user manual

    International Nuclear Information System (INIS)

    Pope, R.B.; MacDonald, R.R.; Massaglia, J.L.; Williamson, D.A.; Viebrock, J.M.; Mote, N.

    1995-09-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from commercial facilities. The objective of the Facility Interface Capability Assessment (FICA) project was to assess the capability of each commercial spent nuclear fuel (SNF) storage facility, at which SNF is stored, to handle various SNF shipping casks. The purpose of this report is describe the FICA computer software and to provide the FICA user with a guide on how to use the FICA system. The FICA computer software consists of two executable programs: the FICA Reactor Report program and the FICA Summary Report program (written in the Ca-Clipper version 5.2 development system). The complete FICA software system is contained on either a 3.5 in. (double density) or a 5.25 in. (high density) diskette and consists of the two FICA programs and all the database files (generated using dBASE III). The FICA programs are provided as ''stand alone'' systems and neither the Ca-Clipper compiler nor dBASE III is required to run the FICA programs. The steps for installing the FICA software system and executing the FICA programs are described in this report. Instructions are given on how to install the FICA software system onto the hard drive of the PC and how to execute the FICA programs from the FICA subdirectory on the hard drive. Both FICA programs are menu driven with the up-arrow and down-arrow keys used to move the cursor to the desired selection

  9. Kiteships, sailing vessels pulled and powered with a kite

    Energy Technology Data Exchange (ETDEWEB)

    Winter, F. de; Swenson, R.B.; Culp, D.

    1999-07-01

    Current windpower technology and future petroleum supply scenarios make it likely that it will become desirable to consider sailing vessels again for the merchant marine. For the wind-powered propulsion it seems possible to use tethered kites, instead of the traditional combination of masts and booms supporting a system of sails. This may be both safer and more cost-effective. The authors are on boat No. 2 in an R and D program aimed at this large scale application, and the present paper represents a progress report. Boat No. 1 was used to achieve speed and power, achieving a speed of 33 knots (over 60 km per hour), and sailing speeds at times of twice the wind velocity. Boat No. 2 will not be used for speed, but for the development of kite deployment and retrieval techniques, with kites of up to 300 sq ft (28 sq m) in surface area.

  10. Wind power in the Danish liberalised power market-Policy measures, price impact and investor incentives

    International Nuclear Information System (INIS)

    Munksgaard, Jesper; Morthorst, Poul Erik

    2008-01-01

    Wind power has a strong position at the Danish electricity market, mainly caused by high feed-in tariffs in the 1990s. Investments in new wind-power installations on land, however, have declined dramatically after the Danish electricity market was liberalised in 1999. First, the paper describes how policy measures directed towards wind power have been redesigned to match the liberalised market. Then, we estimate the impact of the redesigned tariffs on the electricity prices. Finally, we assess whether the new tariffs make an incentive to invest in wind power. The paper concludes that the new tariffs not by itself make evidence for the actual Danish recession in new wind-power installations after the electricity reform. The main causes could include a combination of problems in spatial planning, high risk aversion of new wind turbine investors and perhaps more favourable support schemes in other countries

  11. Surprising results from a search for effective disinfectants for Tobacco mosaic virus-contaminated tools

    Science.gov (United States)

    Tobacco mosaic virus (TMV) and four other tobamoviruses infected multiple petunia cultivars without producing obvious viral symptoms. A single cutting event on a TMV-infected plant was sufficient for transmission to many plants subsequently cut with the same clippers. A number of 'old standbys' an...

  12. The vision of a future energy supply network

    International Nuclear Information System (INIS)

    Koeppel, G.; Favre-Perrod, P.; Geidl, M.; Kloeckl, B.

    2005-01-01

    This article discusses a concept developed within the framework of a project entitled 'Vision of Future Energy Networks' carried out at the Swiss Federal Institute of Technology in Zurich. The project looked at the possibility of using synergies between various energy carriers and systems. Network topologies are discussed that can cope with the distributed production of energy in installations featuring technologies such as combined heat and power, micro gas turbines and wind-power installations. The topics discussed include the use of a large amount of such distributed generation capacity and which network topologies and storage requirements would be necessary for their operation. Also, under the title 'energy hubs', possible synergies with other forms of energy use are examined. The modelling, dimensioning and use of such hubs are dealt with for various scenarios, ranging from single family homes through to combinations of industrial complexes and whole residential areas. Questions of reliability are addressed and the idea of an 'Energy Interconnector' that supplies electrical, chemical and thermal energy is introduced

  13. Solutions-based climate change education for K-Gray: Renewable energy and energy efficiency

    Science.gov (United States)

    Petrone, C.

    2017-12-01

    Through the National Science Foundation-funded MADE CLEAR (www.madeclear.org) climate change education project's Informal Climate Change Education (ICCE) Community, funds were received to collaboratively train teachers, informal educators, students, and university docents in climate change basics and solutions, specifically renewable energy and energy efficiency. In all, 10 docents, 50 classroom teachers, over 600 K-16 students, and several hundred science-interested citizens participated in programs and workshops lasting between one and seven hours. Using commercially available kits and other DIY projects, program participants used science content and engineering to develop models of wind turbines, wind mills, solar cells, solar cookers, solar stills, and wind-powered cars. Using thermal imaging cameras, Kill-a-Watt meters, "Carbon Food Print" kit, "Energy Matters" kit, and other tools, program participants learned about energy efficiency as not only a global climate change mitigation strategy, but also a way to save money. ICCE Community members and external partners, such as local electric cooperative personnel, university researchers, and state-sponsored energy efficiency program personnel, provided content presentations, discussions, and hands-on activities to program participants.

  14. 75 FR 15949 - Revisions to Form, Procedures, and Criteria for Certification of Qualifying Facility Status for a...

    Science.gov (United States)

    2010-03-30

    ... technologies. \\20\\ Interstate Renewable Energy Council and SolarCity (Interstate Renewable); Sun Edison LLC... being small power production facilities, and 90 percent were made by solar-powered and wind-powered... electric energy solely by the use, as a primary energy source, of solar energy, wind energy, waste...

  15. Development of a 5.5 m diameter vertical axis wind turbine, phase 3

    Science.gov (United States)

    Dekitsch, A.; Etzler, C. C.; Fritzsche, A.; Lorch, G.; Mueller, W.; Rogalla, K.; Schmelzle, J.; Schuhwerk, W.; Vollan, A.; Welte, D.

    1982-06-01

    In continuation of development of a 5.5 m diameter vertical axis windmill that consists in conception, building, and wind tunnel testing, a Darrieus rotor windpowered generator feeding an isolated network under different wind velocity conditions and with optimal energy conversion efficiency was designed built, and field tested. The three-bladed Darrieus rotor tested in the wind tunnel was equiped with two variable pitch Savonius rotors 2 m in diameter. By means of separate measures of the aerodynamic factors and the energy consumption, effect of revisions and optimizations on different elements was assessed. Pitch adjustement of the Savonius blades, lubrication of speed reducer, rotor speed at cut-in of generator field excitation, time constant of field excitation, stability conditions, switch points of ohmic resistors which combined with a small electric battery simulated a larger isolated network connected with a large storage battery, were investigated. Fundamentals for the economic series production of windpowered generators with Darrieus rotors for the control and the electric conversion system are presented.

  16. Overview of the New England wind integration. Study and selected results

    Energy Technology Data Exchange (ETDEWEB)

    Norden, John R.; Henson, William L.W. [ISO New England, Holyoke, MA (United States)

    2010-07-01

    ISO New England commissioned a comprehensive wind integration study to be completed in the early fall of 2010: the New England Wind Integration Study (NEWIS). The NEWIS assesses the efects of scenarios that encompass a range of wind-power penetrations in New England using statistical and simulation analysis including the development of a mesoscale wind-to-power model for the New England and Maritime wind resources areas. It also determines the impacts of integrating increasing amounts of wind generation resources for New England, as well as, the measures that may be available to the ISO for responding to any challenges while enabling the integration of wind-power. This paper provides an overview of the study then focuses on selected near final results, particularly with regard to the varying capacity factor, capacity value and siting that were determined as part of the study. The full results of the NEWIS will be released in the fall of 2010. (orig.)

  17. The use of crude protein content to predict concentrations of lysine ...

    African Journals Online (AJOL)

    Correlations were determined between the crude protein (CP) and lysine or methionine concentrations of grain from wheat (cultivar: palmiet), barley (cultivar: clipper) and triticale (cultivar: usgen 19) grown in the Western Cape region of South Africa. Twenty samples of varying CP content were collected for each grain type ...

  18. A Brief History of the Wind Turbine Industries in Denmark and the United States

    DEFF Research Database (Denmark)

    Vestergaard, Jens; Brandstrup, Lotte; Goddard,III, Robert D

    2004-01-01

    The history of wind-power used to produce electricity dates back to the late 19th century and early 20th century when the two pioneering countries in the industry, Denmark and the United States, developed the first electricity-producing wind turbines. Ever since then both countries have invested...

  19. Tilting toward windmills

    International Nuclear Information System (INIS)

    McGowan, J.G.

    1993-01-01

    Emerging from the shadow of an energy crisis in the 1970s, a wind-power industry flourished briefly in the US. Part of an ambitious US government program to support research and development on renewable energy sources, the Department of Energy and the National Aeronautic and Space Agency sponsored the construction of a wide variety of large wind turbines-most accompanied by exaggerated claims by the promoters. But by the 1980s, US interest in wind power almost disappeared due to a drop in world oil prices, the Reagan administrations curtailment of funding, and the disappointing results of the initial wind turbines. The problems with the initial wind turbines was overly optimistic economic projections, siting snags, difficulties connecting wind-generated electricity to utility power grids. Today, however the wind farms in California are a highly productive, inexpensive source of energy. The author presents arguments dispelling the following four widely-believed myths about wind energy: (1) Wind power is not a significant energy source; (2) Wind-generated electricity is expensive and unreliable; (3) New and improved machine designs are needed to make wind power feasible; and (4) The technology is impractical for use by utilities because of problems connecting wind machines to the electricity grid, and because wind itself is intermittent. A study at Battelle Pacific Northwest Lab estimates that turbine technology could supply 20% of the country's electrical needs. Investor-owned wind-power plants in California generate electricity at a rate ranging from 4.7 to 7.2 cents per kilowatt-hour. The reality is that wind-produced electricity is now less expensive that electricity produced by conventional fossil- or nuclear-powered generating plants in many parts of the world. And unlike some of the proposed renewable electric-power sources like photovoltaics, wind power's future is not dependent on further breakthroughs in engineering or materials technology

  20. Avian Collisions with Wind Turbines: A Summary of Existing Studies and Comparisons to Other Sources of Avian Collision Mortality in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, Wallace P.; Johnson, Gregory D.; Strickland, Dale M.; Young, Jr., David P.; Sernka, Karyn J.; Good, Rhett E.

    2001-08-01

    It has been estimated that from 100 million to well over 1 billion birds are killed annually in the United States due to collisions with human-made structures, including vehicles, buildings and windows, powerlines, communication towers, and wind turbines. Although wind energy is generally considered environmentally friendly (because it generates electricity without emitting air pollutants or greenhouse gases), the potential for avian fatalities has delayed and even significantly contributed to blocking the development of some windplants in the U.S. Given the importance of developing a viable renewable source of energy, the objective of this paper is to put the issue of avian mortality associated with windpower into perspective with other sources of avian collision mortality across the U.S. The purpose of this paper is to provide a detailed summary of the mortality data collected at windplants and put avian collision mortality associated with windpower development into perspective with other significant sources of avian collision mortality across the United States. We provide a summary of data collected at many of the U.S. windplants and provide annual bird fatality estimates and projections for all wind turbines in the U.S. For comparison, we also review studies of avian collision mortality from other major human-made structures and report annual bird fatality estimates for these sources. Other sources also significantly contribute to overall avian mortality. For example, the National Audubon Society estimates avian mortality due to house cats at 100 million birds per year. Pesticide use, oil spills, disease, etc., are other significant sources of unintended avian mortality. Due to funding constraints, the scope of this paper is limited to examining only avian mortality resulting from collisions with human-made obstacles.

  1. Pre- and post-construction studies of conflicts between birds and wind turbines in coastal Norway (BirdWind)

    Energy Technology Data Exchange (ETDEWEB)

    Bevanger, K.; Berntsen, Finn; Clausen, Stig; Dahl, E.L.; Flagstad, Oe.; Follestad, A.; Halley, Duncan; Hanssen, Frank; Johnsen, L.; Kvaloey, P.; Lund-Hoel, P.; May, Roel; Nygaard, T.; Pedersen, H.C.; Reitan, O.; Roeskaft, E.; Steinheim, Y.; Stokke, B.; Vang, R.

    2011-07-01

    The BirdWind project (2007-2010) is now concluded. This report summarises the main findings. Several scientific papers are in the process of preparation for publication in international peer re-view journals; this report only provides a brief overview. The main project objective has been to study species-, site- and seasonal-specific bird mortality; and to identify vulnerable species and site-specific factors that should be considered to improve the basis for future pre- and post construction EIAs in connection with wind power-plant constructions. To reach these goals work pack-ages and sub-projects have focused on behavioural and response studies at individual and population levels, for selected model species. The white-tailed eagle has been a focal species during the studies, as several fatalities were recorded in connection with the Smoela Wind-Power Plant (SWPP) even before the project started; the SWPP has been the main arena for project fieldwork. Modelling the WTE collision risk and making a WTE population model were important elements of the project activities. The development of methodologies and technical tools for data collection and mitigating measures has also been an important part of the project. For practical convenience the project was divided into eight sub projects focusing on 1) bird mortality, 2) willow ptarmigan, 3) breeding waders and smaller passerines, 4) white-tailed eagle, 5) bird radar, 6) mitigating technology, 7) data flow and storage systems and 8) GIS, visualization and terrain modelling. Results and preliminary conclusions related to each of these sub tasks are reported. (Author)

  2. 75 FR 39236 - Combined Notice of Filings #1

    Science.gov (United States)

    2010-07-08

    ... New Mexico Wind, LLC; FPL Energy North Dakota Wind, LLC; FPL Energy North Dakota Wind II, LLC; FPL..., AES Energy Storage, LLC, AES Red Oak, LLC, AES Redondo Beach, LLC, Condon Wind Power, LLC, AES... Windpower, LLC; Bayswater Peaking Facility, LLC; Blythe Energy, LLC; Butler Ridge Wind Energy Center, LLC...

  3. 77 FR 3759 - Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2012-01-25

    ...Ener Rim Rock Wind Energy, LLC.... EG12-8-000 Take notice that during the month of December 2011, the... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Agua Caliente Solar, LLC EG12-1-000 Windpower Partners 1993, L.P EG12...

  4. 75 FR 4373 - Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status January 20, 2010. Docket Nos. Gilberton Power Company EG10-1-000 CPV Keenan II Renewable Energy EG10-2-000 Vantage Wind Energy LLC EG10-3-000 Three Buttes Windpower, LLC EG10-4-000 Grant...

  5. 75 FR 23263 - Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC...

    Science.gov (United States)

    2010-05-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-62-000] Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC...

  6. 77 FR 29633 - Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC...

    Science.gov (United States)

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-68-000] Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC...

  7. 75 FR 51990 - Combined Notice of Filings #1

    Science.gov (United States)

    2010-08-24

    ...-1225-009; ER09- 1321-005. Applicants: Blue Canyon Windpower II LLC, Cloud County Wind Farm, LLC, Blue... Ohio, Inc et al submits filing as next of their proposed move from Midwest ISO to PJM following the... the entity making the filing has determined the facility named in the notice meets the applicable...

  8. Public acceptability of California's wind energy developments: three studies

    Energy Technology Data Exchange (ETDEWEB)

    Bosley, P.; Bosley, K.

    1988-01-01

    Qualitative and quantitative research was conducted during 1988 to determine perceptions and attitudes regarding wind energy development as held by government and regulatory officials involved with windfarm development in the three major wind resource regions in California; environmentalists and community activists in these regions; and members of the wind industry. Results indicate that realization of large windfarm projects is being affected by local opposition which exists partly because of lack of knowledge about the technical maturity and economics of today's windpower; opposed interests between the developers and the locality; and development-created problems such as ''Visual Intrusion''. Public acceptability, essential for industry success, may be hindered because wind energy benefits to a locality are not perceived to equal the risks incurred by that particular region. Therefore, the industry needs to continue improving its performance as well as its communications with all affected parties.

  9. Wind-power installation on the Guetsch in Switzerland; Windkraftanlage Guetsch, EW Ursern, Andermatt UR

    Energy Technology Data Exchange (ETDEWEB)

    Russi, M.

    2006-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 800 kW wind turbine installed in 2001/2002 by the Ursern electricity utility near Andermatt, Switzerland, at a height of 2350 meters above sea level. The original prototype wind turbine contained various components from Swiss industry, such as the generator and the inverter. Because of difficulties (cracks in rotor blades, bankruptcy of the manufacturer, etc.) this installation was replaced by an Enercon 600-kW-wind turbine in 2004. Characteristic features of this turbine, such as is its adaptation for use under turbulent wind conditions at cold locations, are discussed. The results obtained in 2005 made it obvious that the utilisation of wind energy in alpine regions is possible and that the extreme conditions at this location do not significantly affect the efficient and safe operation of such an installation. Together with the presence of a meteorological station in the vicinity, optimal operating conditions prevail at this site for further research projects in connection with icing-up of turbine blades and wind energy. The report describes the installation and de-installation of the first turbine and the installation of the present one. Initial experience gained with the installation and its certification by the 'Naturemade' eco-power programme is discussed, as is future expansion at the site.

  10. Importance of Using Multiple Sampling Methodologies for Estimating of Fish Community Composition in Offshore Wind Power Construction Areas of the Baltic Sea

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Mathias H.; Gullstroem, Martin; Oehman, Marcus C. (Dept. of Zoology, Stockholm Univ., Stockholm (Sweden)); Asplund, Maria E. (Dept. of Marine Ecology, Goeteborg Univ., Kristineberg Marine Research Station, Fiskebaeckskil (Sweden))

    2007-12-15

    In this study a visual SCUBA investigation was conducted in Utgrunden 2, an area where windmills had not yet been constructed, and where the bottom mainly consisted of mud or sand with no or a sparse number of algae or mussel beds. A wind farm at Utgrunden 2 would alter the local habitat from a predominantly sandy soft-bottom habitat to an area in which artificial reef structures that resemble hard-bottom habitats is introduced, i.e., the steel foundations and possibly boulders for scour protection. The fish community that will develop over time would be expected to change to resemble the assemblages observed at Utgrunden 1 and hence not visible using trawling and echosound sampling technique. As the goal of EIA is to assess changes, following human development visual techniques is recommended as a complement when examining the environmental effects of offshore windpower. Otherwise important ecological changes may go unnoticed. For a comprehensive understanding of the ecological effects of windfarm developments it is recommended that a combination of sampling methods is applied and that this should be defined before an investigation commences. Although it is well established in the scientific literature that different sampling methods will give different estimations of fish community composition, environmental impact assessments of offshore windpower have been incorrectly interpreted. In the interpretation of the results of such assessments it is common that the findings are extrapolated by stakeholders and media to include a larger extent of the fish populations than what was intended. Therefore, to fully understand how windpower influences fish the underwater visual census technique is here put forward as a necessary complement to more widescreening fish sampling methods (e.g., gill nets, echo-sounds, trawling)

  11. Wind power: breakthrough to global dimensions

    International Nuclear Information System (INIS)

    Horrighs, W.

    1996-01-01

    The beginning of the 1980s saw the start of wind-turbine manufacture. Soon it had become a booming industrial sector, thanks mainly to the spirit of some young entrepreneurs and political support in many countries. But the wind-power market has assumed global dimensions and major structural changes have to be faced. (author)

  12. Wind: small is beautiful

    International Nuclear Information System (INIS)

    Vries, E. de

    2005-01-01

    The small wind sector (0.5-100 kW) is often overlooked but could provide decentralised energy systems. Small wind turbines have been used for homes, farms and small businesses for over 80 years (e.g. in the USA and the Netherlands), receiving a boost in the 1970s and 1980s following the 1973 oil crisis when a new generation of turbines entered the European and US markets. Bergey Windpower and Southwest Windpower from the USA are the market leaders in this sector in terms of sales volume but are still classed as medium-sized enterprises. Small turbines have the disadvantage of higher costs compared with large turbines due to higher manufacturing costs, technical factors associated with the tendency to use small turbines on relatively short towers, small production runs and a failure to keep up with the latest design developments such as cost-effective state-of-the-art frequency converters. Most small turbines are horizontal axis turbines, though vertical axis turbines are produced by some manufacturers. Examples of the systems available from European suppliers are described

  13. Wind energy R and D at PG and E

    International Nuclear Information System (INIS)

    Steeley, W.J.

    1992-01-01

    PG and E's Department of Research and Development (R and D) is involved in several wind energy projects. The performance of the wind turbines in Altamont Pass, Solano County, and Pacheco Pass has been monitored since 1981. As of December 1991, there is a total of about 825 MW of wind power in PG and E's service territory. The wind turbines in these areas produced about 1,160,000,000 kWh in 1990, which corresponds to an overall capacity factor of 16%. This is about 1.5% of PG and E's system load. PG and E is planning to begin an advanced wind power plant demonstration in 1992. This paper reports that the project objectives are to evaluate the technical and economic characteristics of advanced wind energy plant designs; to establish construction, operation, and maintenance requirements and practices; and to evaluate emerging machines that show potential for significant advances over present technology. U.S. Windpower, the Electric Power Research Institute, Niagara Mohawk Power, and PG and E are involved in a joint program to develop a variable speed advanced wind turbine. PG and E is providing development funding and reviewing the design from an operation and maintenance perspective

  14. Connecting Requirements to Architecture and Analysis via Model-Based Systems Engineering

    Science.gov (United States)

    Cole, Bjorn F.; Jenkins, J. Steven

    2015-01-01

    In traditional systems engineering practice, architecture, concept development, and requirements development are related but still separate activities. Concepts for operation, key technical approaches, and related proofs of concept are developed. These inform the formulation of an architecture at multiple levels, starting with the overall system composition and functionality and progressing into more detail. As this formulation is done, a parallel activity develops a set of English statements that constrain solutions. These requirements are often called "shall statements" since they are formulated to use "shall." The separation of requirements from design is exacerbated by well-meaning tools like the Dynamic Object-Oriented Requirements System (DOORS) that remained separated from engineering design tools. With the Europa Clipper project, efforts are being taken to change the requirements development approach from a separate activity to one intimately embedded in formulation effort. This paper presents a modeling approach and related tooling to generate English requirement statements from constraints embedded in architecture definition.

  15. Green power: naturemade - History of a label

    International Nuclear Information System (INIS)

    Lainsecq, M. de

    2003-01-01

    This article presents the history of the set of 'naturemade' labels that are used to designate power generated in facilities that use renewable energy. Electricity from hydropower, wind-power, biogas and solar energy plants that fulfil particular ecological conditions receives a special label, 'Naturemade Star'. 'Normal' hydropower can be awarded the 'Naturemade Basic' label. The development of the labels is discussed in the light of increasing liberalisation of European electricity markets and increasing sales of 'green power' by electricity utilities. The need for certification of production facilities and the founding of the label's certification authority, the 'Verein fuer umweltgerechte Elektrizitaet' (VUE), a society for the promotion of environment-friendly electricity, are discussed. Criticisms made by certain environmental protection organisations on the awarding of the 'Naturemade Basic' label to projects that in their opinion do not help protect the environment are quoted. The article is completed with an interview on the subject with Ursula Stocker from the VUE

  16. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  17. Mapping the Topography of Europa: The Galileo-Clipper Story

    Science.gov (United States)

    Schenk, Paul M.

    2014-11-01

    The renewed effort to return to Europa for global mapping and landing site selection raises the question: What do we know about Europa topography and how do we know it? The question relates to geologic questions of feature formation, to the issue of ice shell thickness, mechanical strength, and internal activity, and to landing hazards. Our topographic data base for Europa is sparse indeed (no global map is possible), but we are not without hope. Two prime methods have been employed in our mapping program are stereo image and shape-from-shading (PC) slope analyses. On Europa, we are fortunate that many PC-DEM areas are also controlled by stereo-DEMs, mitigating the long-wavelength uncertainties in the PC data. Due to the Galileo antenna malfunction, mapping is limited to no more than 20% of the surface, far less than for any of the inner planets. Thirty-seven individual mapping sites have been identified, scattered across the globe, and all have now been mapped. Excellent stereo mapping is possible at all Sun angles, if resolution is below ~350 m. PC mapping is possible at Sun angles greater than ~60 degrees, if emission angles are less than ~40 degrees. The only extended contiguous areas of topographic mapping larger than 150 km across are the two narrow REGMAP mapping mosaics extending pole-to-pole along longitudes 85 and 240 W. These are PC-only and subject to long-wavelength uncertainties and errors, especially in the north/south where oblique imaging produces layover. Key findings include the mean slopes of individual terrain types (Schenk, 2009), topography across chaos (Schenk and Pappalardo, 2004), topography of craters and inferences for ice shell thickness (Schenk, 2002; Schenk and Turtle, 2009), among others. A key discovery, despite the limited data, is that Europan terrains rarely have topographic amplitude greater than 250 meters, but that regionally Europa has imprinted on it topographic amplitudes of +/- 1 km, in the form of raised plateaus and bowed-down arcuate troughs. Such amplitudes imply that the ice shell is capable of supporting relief and is not extremely thin.

  18. Getting a grip on tariffs and subsidies

    International Nuclear Information System (INIS)

    Mitchell, C.

    1993-01-01

    The tariff and subsidy support available for windpower producers in Denmark, the Netherlands, Germany and the U.K. is compared. Tariffs and subsidies, along with the availability of finance, are important supportive factors in the development of wind energy in Europe. The available tariffs, subsidies and financing mechanisms available in a country determines how the wind energy programme develops. (author)

  19. Induction generator-induction motor wind-powered pumping system

    Energy Technology Data Exchange (ETDEWEB)

    Miranda, M.S.; Lyra, R.O.C.; Silva, S.R. [CPDEE - UFMG, Belo Horizonte (Brazil)

    1997-12-31

    The energy storage matter plays an important role in wind-electric conversion systems for isolated applications. Having that in mind, two different approaches can be basically considered: either the immediate conversion of the generated electric energy, as in a water pumping system or electric energy storage for later use, as in a battery charging system. Due to some features such as no need of an external reactive power source and, sometimes, a gearbox, permanent-magnet synchronous generators have been broadly used in low rated power isolated systems. Despite that, system performance can be affected when the generator is feeding an inductive load (e.g., an induction motor) under variable-speed-variable-frequency operational conditions. Since there is no effective flux control, motor overload may occur at high wind speeds. Thus, good system performance can be obtained through additional control devices which may increase system cost. Although being rugged and cheap, induction machines always work as a reactive power drain; therefore, they demand an external reactive power source. Considering that, reactive static compensators appear as an attractive alternative to the cost x performance problem. In addition to that, different control strategies can be used so that system performance can be improved.

  20. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  1. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  2. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  3. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  4. Future needs for improvement of NIHL awareness training and HPD practices in the South African mining industry

    CSIR Research Space (South Africa)

    Edwards, A

    2012-08-01

    Full Text Available around the ears. ? Custom moulded for individuals ear-some of the brand names are Variphone, Noise Ban, Noise Clipper 7 Methodology ? Literature review ? Survey mines- interview managers ? Interview employees ? Observe employees 8... like?...continued 6. Training methods - Adult education - own language, visually stimulating, interactive, perceptions of susceptibility, touch emotions 7. Essential content of awareness training-cause of NIHL, effect of NIHL, methods to mitigate...

  5. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  6. Wind pumps for agriculture: Cost and environmental benefits (comparisons with electric and combustion engine driven pumps)

    International Nuclear Information System (INIS)

    Piccoli, F.

    1991-01-01

    After describing initial and running costs of a group of wind-pumps, the author calculates and compares, as far as agricultural and zootechnical purposes are concerned, the costs for each cubic meter of water extracted through wind-powered, electric and internal-combustion engines. The comparisons clearly show, under adequate wind conditions, that wind-pumps are economically more suitable than electric and motor pumps with similar delivery heads

  7. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  8. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  9. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  10. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  11. SHUFFLE. Windows 95/98/2000 version

    International Nuclear Information System (INIS)

    Slavic, S.; Zefran, B.

    2000-01-01

    Program package SHUFFLE was developed to help the user during fuel loading and unloading operations at a nuclear power plant. The first version, developed in 1992, has been written in the CLIPPER program language and run under the DOS operating system. Since the DOS environment exhibits several drawbacks regarding code portability and flexibility, the recent SHUFFLE version has been transformed to run under the MS Windows operating system. (author)

  12. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  13. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  14. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  15. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  16. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  17. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  18. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  19. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  20. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  1. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  2. Wind energy research at the Guajira region and inter-institutional experience

    International Nuclear Information System (INIS)

    Rodriguez Devis, J.M.

    1991-01-01

    This presentation was based on a video, describing the activities of the test station at the National University of Columbia. In the specific case of wind energy, the aim of the research group is to realize technological innovation without interfering in the Wayuu community and its ecological ambience. The Wayuu are shepherds, who occupy the arid peninsula of Guajira in the north of Columbia. The short term strategies are the fortification of the scientific and technical community in the National University and Guajira, centralized in SENA (Servicio Nacional de Aprendizaje) and Universidad de la Guajira and the integration with the community, who shall use the project. In medium terms the objective is to spread the technology in the productive rural sector, the integration of little companies and the support of health plans of the Wayuu community by means of endowing of drinking water and electricity. Detailed information on the Guajira's test field and characteristics of the developed prototype wind-powered pumps and wind generators are presented. 4 figs., 3 ills., 2 photo's, 1 tab., 2 apps

  3. Forecasting US renewables in the national energy modelling system

    International Nuclear Information System (INIS)

    Diedrich, R.; Petersik, T.W.

    2001-01-01

    The Energy information Administration (EIA) of the US Department of Energy (DOE) forecasts US renewable energy supply and demand in the context of overall energy markets using the National Energy Modelling System (NEMS). Renewables compete with other supply and demand options within the residential, commercial, industrial, transportation, and electricity sectors of the US economy. NEMS forecasts renewable energy for grid-connected electricity production within the Electricity Market Module (EM), and characterizes central station biomass, geothermal, conventional hydroelectric, municipal solid waste, solar thermal, solar photovoltaic, and wind-powered electricity generating technologies. EIA's Annual Energy Outlook 1998, projecting US energy markets, forecasts marketed renewables to remain a minor part of US energy production and consumption through to 2020. The USA is expected to remain primarily a fossil energy producer and consumer throughout the period. An alternative case indicates that biomass, wind, and to some extent geothermal power would likely increase most rapidly if the US were to require greater use of renewables for power supply, though electricity prices would increase somewhat. (author)

  4. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  5. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  6. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  7. Response to Oil Sands Products Assessment

    Science.gov (United States)

    2015-09-01

    clothing , and eye protection. The MSDS for natural gas condensate for Oneok (2009) warns that condensate, being denser than air, will accumulate in...with shovels and clippers and plastic bags collecting all this stuff.” Detergents were ineffective, Hamilton said (Schulte, 2013). 3.4.5 Lack of...oil, are pumped to these basins—or ponds— where settling occurs and water is recycled for reuse in the process. When the ponds are no longer required

  8. A Suborbital Spaceship for Short Duration Space and Microsat Launch

    OpenAIRE

    Bahn, Pat

    2005-01-01

    The TGV Rockets corporation is working on a small Vertical Takeoff Vertical Landing Suborbital Rocketship capable of carrying 1000 kg to 100 km for low cost. This provides unique and interesting capabilities for payload test and qualification, development and short duration experimentation. Theoretical possibilities include micro-sat launch. TGV Rockets was founded in 1997 on a desire to commercialize the Delta Clipper-Experimental (DC-X)1,5,8. Subsequently TGV has been working towards th...

  9. SIDA - System for importation distribution and acquisition of radioisotope - User manual

    International Nuclear Information System (INIS)

    1991-01-01

    The SIDA manual (system for importation, distribution and acquisition of radioisotopes) is presented. The SIDA is a system of consult and update to control importation and distribution of radioisotopes in the country. It allows to accompany processes from importation requirement to distribution of radioisotopes, executing the accountancy of I-125, which is distributed for several interprises. The system was developed in CLIPPER87 using DBASE III PLUS data base management. (M.C.K.)

  10. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  11. Green Subsidies and Learning-by-doing in the Windmill Industry

    DEFF Research Database (Denmark)

    Hansen, Jørgen Drud; Jensen, Camilla; Madsen, Erik Strøjer

    2001-01-01

    of windmills a dynamic cost function for producing windmills is tested. The cost disadvantage of producing electricity by windmills relative to traditional power stations has narrowed considerably because of a strong learning-by-doing effect. The deliberate policy to subsidize production of electricity...... by windpower has placed Denmark in a first-mover position in this market and the future has to show whether this is a successful story of an infant industrial policy....

  12. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  13. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  14. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  15. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  16. Windpower 2000: The growing U.S. wind energy base

    International Nuclear Information System (INIS)

    Bergey, M.L.S.; Swisher, R.

    1994-01-01

    The American Wind Energy Association (AWEA) has set forth the following wind energy industry objectives for the year 2000: (1) to achieve 10,000 MW cumulative, grid-connected wind power capacity in the United States; (2) to build a $4 billion domestic wind industry base capable of delivering at least 3,000 MW of turbine production per year; (3) to create tens of thousands of new, long-term, skilled jobs, primarily in the manufacturing sector; (4) to achieve levelized costs below four cents per kWh and capital costs 30 percent lower than current costs; (5) to make wind power a major renewable energy option in achieving the nation's' global climate change objectives; (6) to make the US wind power industry the world's technology leader and lowest-cost supplier. This paper will describe the industry's progress toward meeting these goals by presenting the milestones that have been achieved over the last year. In addition, the paper will discuss the Association's strategy for addressing remaining obstacles and moving wind energy into the status of a generally accepted utility technology and one of the lowest cost providers of bulk power for the 21st century

  17. Windpower `96 - Proceedings of the American Wind Energy Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This document consists of eighty individual papers submitted to this conference. Wind power is discussed from many perspectives ranging from non-technical to technical. The include: energy policy; the world wide market to include Europe, Asia, the Americas, marketing strategies to promote wind power, economics, turbine development, electrical systems, testing, advanced components, utility issues, resource assessment, aerodynamics studies, wind-diesel systems, and dynamic modeling. Individual papers are indexed separately on the Energy Data Base.

  18. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  19. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  20. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  1. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  2. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  3. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  4. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  5. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  6. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  7. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  8. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  9. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  10. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  11. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  12. Studying the Formation, Evolution, and Habitability of the Galilean Satellites

    Science.gov (United States)

    McGrath, M.; Waite, J. H. Jr.; Brockwell, T.; McKinnon, W.; Wyrick, D.; Mousis, O.; Magee, B.

    2013-01-01

    Highly sensitive, high-mass resolution mass spectrometry is an important in situ tool for the study of solar system bodies. In this talk we detail the science objectives, develop the rationale for the measurement requirements, and describe potential instrument/mission methodologies for studying the formation, evolution, and habitability of the Galilean satellites. We emphasize our studies of Ganymede and Europa as described in our instrument proposals for the recently selected JUICE mission and the proposed Europa Clipper mission.

  13. Toeless pulse shaping with a single delay-line network

    International Nuclear Information System (INIS)

    Tauhata, L.; Binns, D.C.

    1976-04-01

    New unipolar delay-line clippers producing negligible cancellation remnant have been developed. Near perfect clipping is achieved using a combination of several types of coaxial cable tranformers working as a phase inverter, a new pulse adder, or an impedance transformer. Only passive elements are used in the bridge network. The construction is simple and the performance is extremely stable and wide in dynamic range and frequency band width. Completely symmetrical bipolar pulses are also easily obtained using this technique

  14. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  15. International Nuclear Model personal computer (PCINM): Model documentation

    International Nuclear Information System (INIS)

    1992-08-01

    The International Nuclear Model (INM) was developed to assist the Energy Information Administration (EIA), U.S. Department of Energy (DOE) in producing worldwide projections of electricity generation, fuel cycle requirements, capacities, and spent fuel discharges from commercial nuclear reactors. The original INM was developed, maintained, and operated on a mainframe computer system. In spring 1992, a streamlined version of INM was created for use on a microcomputer utilizing CLIPPER and PCSAS software. This new version is known as PCINM. This documentation is based on the new PCINM version. This document is designed to satisfy the requirements of several categories of users of the PCINM system including technical analysts, theoretical modelers, and industry observers. This document assumes the reader is familiar with the nuclear fuel cycle and each of its components. This model documentation contains four chapters and seven appendices. Chapter Two presents the model overview containing the PCINM structure and process flow, the areas for which projections are made, and input data and output reports. Chapter Three presents the model technical specifications showing all model equations, algorithms, and units of measure. Chapter Four presents an overview of all parameters, variables, and assumptions used in PCINM. The appendices present the following detailed information: variable and parameter listings, variable and equation cross reference tables, source code listings, file layouts, sample report outputs, and model run procedures. 2 figs

  16. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  17. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  18. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  19. Avian use of proposed KENETECH and CARES wind farm sites in Klickitat County, Washington. Appendix C to Washington Windplant No. 1 EIS. Technical report

    International Nuclear Information System (INIS)

    1995-01-01

    The Columbia Hills area above (north of) the Columbia River in Klickitat County, in southcentral Washington, is being considered for development of two wind power generation projects that could include the eventual placement of up to 436 wind turbines. The KENETECH Windpower Washington Windplant TM Number 1 project would include placing up to 345 KENETECH 33M-VS turbines, capable of producing up to 115 megawatts (MW), in 39 rows (strings) on a 5,110-hectare (12,630-acre) site. During scoping for these proposed developments, concerns were raised regarding the potential for avian mortality associated with wind farm development. Collision with wind turbine blade, towers, guy wires, and transmission lines, and electrocution from power lines have been identified as sources of avian mortality, particularly raptors, at existing wind farm facilities. To address these concerns, an avian study was conducted at the site in accordance with an avian study plan and protocol developed, with input from a national avian task force, state agencies (Washington Department of Fish and Wildlife [WDFW]), and federal agencies (USFWS). The study included four elements: (1) a winter raptor and waterfowl study, (2) spring migration and fall migration studies, (3) a summer resident study, and (4) a raptor breeding study. The study involved extensive field studies conducted by biologists experienced in identifying raptors and other birds

  20. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  1. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  2. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  3. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  4. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  5. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  6. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  7. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  8. The Wind Energy programme - SFOE Research Programme 2000 - 2003; Programm Wind. Konzept BFE-Forschungsprogramm 'Wind' 2000 - 2003

    Energy Technology Data Exchange (ETDEWEB)

    Horbaty, R.

    2001-07-01

    This document, issued by the Swiss Federal Office of Energy (SFOE) describes the concept behind the Swiss wind energy programme. The first part of the report discusses the origins and development of the wind energy programme in Switzerland, discussing the importance of wind energy and policy matters associated with its promotion. The experience gained during the previous research programmes is reviewed. The degree to which targets were reached, promotional activities, the central government's own wind energy activities and the results of a programme evaluation are discussed. Lists of projects that have been realised and activities that have been carried out are presented and positive and negative influences on development are noted. A second part is dedicated to the goals of the wind energy programme in terms of target figures for the year 2010 and the strategies chosen to reach these goals, including pilot and demonstration projects (P and D) and promotional activities. Details of the P and D programme including lists of wind-power projects to be supported, the priorities that have been set and information and further education that is to be provided, are given. New activities in the wind power area such as the development of new type of wind turbine especially suited to alpine conditions are discussed. The role of the Swiss Association for Wind Energy 'Suisse Eole' as a network-partner in the wind energy programme is discussed. An appendix provides details of wind energy projects in Switzerland, market partners and customers. The results of a survey made of wind energy activities at Swiss institutes of higher education are presented.

  9. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  10. Mathematical modelling of the 1 MHz beam chopper for the KAON factory

    International Nuclear Information System (INIS)

    Barnes, M.J.; Wait, G.D.; Fiander, D.C.

    1990-06-01

    The proposed KAON factory at TRIUMF requires a 1 MHz (10 6 discrete pulses/s) beam chopper to create appropriate beam gaps in the extracted cyclotron beam. A novel technique, which gives relatively high energy efficiency, has been proposed for the chopper. The novel aspect of the chopper, which is an electric field device, is the use of a transmission line on which pulses are stored. Deflection of the bunches to be eliminated will be predominantly provided by an electric field between the deflector plates of the chopper, although there may be a magnetic component of kick as well. At the driving end of the transmission line there will be two tetrodes, a charger and a clipper: inevitably there is stray capacitance and inductance associated with this circuitry. The presence of the parasitic elements adversely affects losses in both the charger and clipper circuits, and distorts the stored voltage pulse: this may also cause beam bunches to be kicked when ideally they should receive no kick, and cause variations in the kick-strength 'flat-top'. In order to assess the effect of stray capacitance and other circuit parameters upon particle deflection, simulations have been performed using the PSpice circuit analysis package. The simulations include tracking of beam particles through the deflector plates of the 1 MHz chopper, and a representative model of the tetrodes. (Author) 8 refs., 7 figs

  11. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  12. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  13. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  14. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  15. Linear wind generator

    International Nuclear Information System (INIS)

    Kozarov, A.; Petrov, O.; Antonov, J.; Sotirova, S.; Petrova, B.

    2006-01-01

    The purpose of the linear wind-power generator described in this article is to decrease the following disadvantages of the common wind-powered turbine: 1) large bending and twisting moments to the blades and the shaft, especially when strong winds and turbulence exist; 2) significant values of the natural oscillation period of the construction result in the possibility of occurrence of destroying resonance oscillations; 3) high velocity of the peripheral parts of the rotor creating a danger for birds; 4) difficulties, connected with the installation and the operation on the mountain ridges and passages where the wind energy potential is the largest. The working surfaces of the generator in questions driven by the wind are not connected with a joint shaft but each moves along a railway track with few oscillations. So the sizes of each component are small and their number can be rather large. The mechanical trajectory is not a circle but a closed outline in a vertical plain, which consists of two rectilinear sectors, one above the other, connected in their ends by semi-circumferences. The mechanical energy of each component turns into electrical on the principle of the linear electrical generator. A regulation is provided when the direction of the wind is perpendicular to the route. A possibility of effectiveness is shown through aiming of additional quantities of air to the movable components by static barriers

  16. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  17. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  18. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  19. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  20. Avian use of proposed KENETECH and CARES wind farm sites in Klickitat County, Washington: Technical report. Appendix D

    International Nuclear Information System (INIS)

    1995-01-01

    The Columbia Hills area above (north of) the Columbia River in Klickitat County, in southcentral Washington, is being considered for development of two wind power generation projects that could include the eventual placement of up to 436 wind turbines. The KENETECH Windpower Washington Windplant trademark Number 1 project would include placing up to 345 KENETECH 33M-VS turbines, capable of producing up to 115 megawatts (MW), in 39 rows (strings) on a 5,110-hectare (12,630-acre) site. The Conservation and Renewable Energy Systems (CARES) Columbia Wind Farm number-sign 1 project would include placing 91 Flowind AWT-26 turbines, capable of generating 25 MW, in 11 rows on a 395-hectare (975-acre) site. During scoping for these proposed developments, concerns were raised regarding the potential for avian mortality associated with wind farm development. Collision with wind turbine blade, towers, guy wires, and transmission lines, and electrocution from power lines have been identified as sources of avian mortality, particularly raptors, at existing wind farm facilities. To address these concerns, an avian study was conducted at the site in accordance with an avian study plan and protocol developed, with input from a national avian task force, state agencies (Washington Department of Fish and Wildlife [WDFW]), and federal agencies (USFWS). The study included four elements: (1) a winter raptor and waterfowl study, (2) spring migration and fall migration studies, (3) a summer resident study, and (4) a raptor breeding study. The study involved extensive field studies conducted by biologists experienced in identifying raptors and other birds

  1. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  2. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  3. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  4. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  5. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  6. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  7. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  8. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  9. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  10. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  11. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  12. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  13. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  14. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  15. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  16. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  17. Strategies for Voltage Control and Transient Stability Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hiskens, Ian A.

    2013-09-25

    voltage control equipment including tapchanging transformers, switched capacitors, SVCs, STATCOMs and the WTGs themselves. The project has considered the coordinated control of this equipment, and has addressed a range of issues that arise in wind-farm operation. The first concerns the ability of WTGs to meet reactive power requirements when voltage saturation in the collector network restricts the reactive power availability of individual generators. Secondly, dynamic interactions between voltage regulating devices have been investigated. It was found that under certain realistic conditions, tap-changing transformers may exhibit instability. In order to meet cost, maintenance, fault tolerance and other requirements, it is desirable for voltage control equipment to be treated as an integrated system rather than as independent devices. The resulting high-level scheduling of wind-farm reactive support has been investigated. In addressing this control problem, several forms of future information were considered, including exact future knowledge and stochastic predictions. Deterministic and Stochastic Dynamic Programming techniques were used in the development of control algorithms. The results demonstrated that while exact future knowledge is very useful, simple prediction methods yield little bene fit. The integration of inherently variable wind generation into weak grids, particularly subtransmission networks that are characterized by low X=R ratios, aff ects bus voltages, regulating devices and line flows. The meshed structure of these networks adds to the complexity, especially when wind generation is distributed across multiple nodes. A range of techniques have been considered for analyzing the impact of wind variability on weak grids. Sensitivity analysis, based on the power-flow Jacobian, was used to highlight sections of a system that are most severely a ffected by wind-power variations. A continuation power flow was used to determine parameter changes that reduce

  18. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  19. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  20. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  1. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  2. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  3. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  4. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  5. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  6. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  7. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  8. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  9. The Magic Background of Pearl Harbor. Volume 2. Appendix

    Science.gov (United States)

    1977-01-01

    kingnt rt rd,ly am iat lyf rii st re ratonawsu blep t tyi gthV chyes y ,ew llight.I iath t l sbegayqu tstv r alassfr m n ." FROM:TO: our571a...time being assembled and prepared. TO CHIN on the Matsonia scheduled to leave the 2nd. Boarding a clipper at that place he is scheduled to leave for...in international affairs, go to the United States, together with CHIN Their principal task is to engage in propaganda and intelligence work. Before

  10. An Industry/Academe Consortium for Achieving 20% wind by 2030 through Cutting-Edge Research and Workforce Training

    Energy Technology Data Exchange (ETDEWEB)

    Sotiropoulos, Fotis [Univ. of Minnesota, Minneapolis, MN (United States); Marr, Jeffrey D.G. [Univ. of Minnesota, Minneapolis, MN (United States); Milliren, Christopher [Univ. of Minnesota, Minneapolis, MN (United States); Kaveh, Mos [Univ. of Minnesota, Minneapolis, MN (United States); Mohan, Ned [Univ. of Minnesota, Minneapolis, MN (United States); Stolarski, Henryk [Univ. of Minnesota, Minneapolis, MN (United States); Glauser, Mark [Univ. of Minnesota, Minneapolis, MN (United States); Arndt, Roger [Univ. of Minnesota, Minneapolis, MN (United States)

    2013-12-01

    In January 2010, the University of Minnesota, along with academic and industry project partners, began work on a four year project to establish new facilities and research in strategic areas of wind energy necessary to move the nation towards a goal of 20% wind energy by 2030. The project was funded by the U.S. Department of Energy with funds made available through the American Recovery and Reinvestment Act of 2009. $7.9M of funds were provided by DOE and $3.1M was provided through matching funds. The project was organized into three Project Areas. Project Area 1 focused on design and development of a utility scale wind energy research facility to support research and innovation. The project commissioned the Eolos Wind Research Field Station in November of 2011. The site, located 20 miles from St. Paul, MN operates a 2.5MW Clipper Liberty C-96 wind turbine, a 130-ft tall sensored meteorological tower and a robust sensor and data acquisition network. The site is operational and will continue to serve as a site for innovation in wind energy for the next 15 years. Project Areas 2 involved research on six distinct research projects critical to the 20% Wind Energy by 2030 goals. The research collaborations involved faculty from two universities, over nine industry partners and two national laboratories. Research outcomes include new knowledge, patents, journal articles, technology advancements, new computational models and establishment of new collaborative relationships between university and industry. Project Area 3 focused on developing educational opportunities in wind energy for engineering and science students. The primary outcome is establishment of a new graduate level course at the University of Minnesota called Wind Engineering Essentials. The seminar style course provides a comprehensive analysis of wind energy technology, economics, and operation. The course is highly successful and will continue to be offered at the University. The vision of U.S. DOE to

  11. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  12. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  13. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  14. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  15. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  16. Ecotribology research developments

    CERN Document Server

    2016-01-01

    This book presents resent research advances in the area of eco-triobology. In the last years, eco-tribology or environmentally friendly tribology has gained increasing importance in sustainable engineering. Environmentally acceptable tribological practices save resources by optimizing product usage and reducing energy. This book covers current developments in all areas covered by the term eco-tribology, including biomimetics surfaces, control of friction and wear, environmental aspects of lubrication and surface modification techniques as well as tribological aspects of green applications, such wind-power turbines or solar panels.

  17. Economic importance of bats in agriculture

    Science.gov (United States)

    Boyles, Justin G.; Cryan, Paul M.; McCracken, Gary F.; Kunz, Thomas H.

    2011-01-01

    White-nose syndrome (WNS) and the increased development of wind-power facilities are threatening populations of insectivorous bats in North America. Bats are voracious predators of nocturnal insects, including many crop and forest pests. We present here analyses suggesting that loss of bats in North America could lead to agricultural losses estimated at more than $3.7 billion/year. Urgent efforts are needed to educate the public and policy-makers about the ecological and economic importance of insectivorous bats and to provide practical conservation solutions.

  18. Wind power engine

    Energy Technology Data Exchange (ETDEWEB)

    Musgrove, P J

    1977-02-10

    The device is a wind-power engine with vertical axis and with one or several wings with airfoil profile fixed on a frame which is pivoted at the vertical axis. Each wing forms at least on one part of its length an angle of inclination with the vertical. The angle increases under the influence of the centrifugal force when the r.p.m. exceed a normal operation range. This method helps to reduce mechanical loads occurring with high wind speeds without requiring a complicated construction.

  19. Navigations and governance in the Danish energy transition reflecting changing Arenas of Development, controversies and policy mixes

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Jørgensen, Ulrik; Jensen, Jens Stissing

    2017-01-01

    -organising actor-constellations are constitutional for arenas and define their boundaries and the policies employed. We discuss the historic transitions in relation to four focal areas of Danish attempts to become independent of fossil energy: wind-power integration in the energy system, energy savings, biomass...... and sustainable mobility. The analysis demonstrates the conflicts and mixes of policy measures that have moved transition processes forward, but sometimes also stalling them. The analysis shows how changing controversies, arena configurations and policy mixes move forward the energy transition process....

  20. Optimization of electrical parameters of windings used in axial flux electrical machines

    International Nuclear Information System (INIS)

    Uhrik, M.

    2012-01-01

    This paper deals with shape optimization of windings used in electrical machines with disc type construction. These machines have short axial length what makes them suitable for use in small wind-power turbines or in-wheel traction drives. Disc type construction of stator offers more possibilities for winding arrangements than are available in classical machines with cylindrical construction. To find out the best winding arrangement for the novel disc type machine construction a series of analytical calculations, simulations and experimental measurements were performed. (Authors)

  1. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  2. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  3. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  4. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  5. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  6. Temporal Chemical Data for Sediment, Water, and Biological Samples from the Lava Cap Mine Superfund Site, Nevada County, California-2006-2008

    Science.gov (United States)

    Foster, Andrea L.; Ona-Nguema, Georges; Tufano, Kate; White, Richard III

    2010-01-01

    The Lava Cap Mine is located about 6 km east of the city of Grass Valley, Nevada County, California, at an elevation of about 900 m. Gold was hosted in quartz-carbonate veins typical of the Sierran Gold Belt, but the gold grain size was smaller and the abundance of sulfide minerals higher than in typical deposits. The vein system was discovered in 1860, but production was sporadic until the 1930s when two smaller operations on the site were consolidated, a flotation mill was built, and a 100-foot deep adit was driven to facilitate drainage and removal of water from the mine workings, which extended to 366 m. Peak production at the Lava Cap occurred between 1934 and 1943, when about 90,000 tons of ore per year were processed. To facilitate removal of the gold and accessory sulfide minerals, the ore was crushed to a very fine sand or silt grain size for processing. Mining operations at Lava Cap ceased in June 1943 due to War Production Board Order L-208 and did not resume after the end of World War II. Two tailings retention structures were built at the Lava Cap Mine. The first was a log dam located about 0.4 km below the flotation mill on Little Clipper Creek, and the second, built in 1938, was a larger earth fill and rip-rap structure constructed about 2 km downstream, which formed the water body now called Lost Lake. The log dam failed during a storm that began on December 31, 1996, and continued into January 1997; an estimated 8,000-10,000 m3 of tailings were released into Little Clipper Creek during this event. Most of the fine tailings were deposited in Lost Lake, dramatically increasing its turbidity and resulting in a temporary 1-1.5 m rise in lake level due to debris blocking the dam spillway. When the blockage was cleared, the lake level quickly lowered, leaving a ?bathtub ring? of very fine tailings deposited substantially above the water line. The U.S. Environmental Protection Agency (EPA) initiated emergency action in late 1997 at the mine site to reduce

  7. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  8. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  9. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  10. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  11. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  12. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  13. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  14. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  15. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  16. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  17. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  18. Comportamiento Agronómico de seis variedades de Cebada (Hordeum Vulgare en tres localidades, Provincia de Santa Elena.

    Directory of Open Access Journals (Sweden)

    Néstor Orrala B

    2015-10-01

    Full Text Available En la península de Santa Elena de mayo a diciembre, las temperaturas giran alrededor de 22 ºC, , lo que podría ser un medio adecuado para muchos cultivos andinos. El estudio exploratorio tuvo como objetivo verificar el comportamiento agronómico de variedades de cebada: Terán, Cañicapa 03, Clipper , Grit, Metcalfe y Scarlett en tres ambientes de la provincia de Santa Elena. Variables evaluadas: germinación, ahijamiento, encañado, espigado, maduración, altura de planta, número de macollos, longitud de espiga, cantidad de granos llenos y vanos, peso 1 000 semillas, rendimiento por hectárea, más análisis económico. Los resultados concluyen que las etapas fenológicas son más cortas en la Costa que en la Sierra, pudiéndose afirmar que el ciclo vegetativo de los germoplasmas está determinado por la interacción genotipo-ambiente y por las características varietales de cada cultivar. Las variedades Metcalfe, Scarlett y Clipper alcanzan rendimientos entre 3,55 y 4,35 toneladas por hectárea. El costo de producción por hectárea es mayor con relación a la sierra, lo que se explica en el mayor uso del recurso agua.Palabras claves: Cebada, comportamiento, variedades, épocas, adaptación.

  19. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  20. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  1. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  2. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  3. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  4. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  5. Assessing impacts to birds from the Buffalo Ridge, Minnesota windplant development

    Energy Technology Data Exchange (ETDEWEB)

    Strickland, M.D.; Johnson, G.D.; Erickson, W.P. [WEST Inc., Cheyenne, WY (United States)] [and others

    1997-12-31

    Northern States Power (NSP) plans development of a 425 MW windpowered electrical generation facility within the Buffalo Ridge Wind Resource Area (WRA) in southwestern Minnesota. In 1996, Western EcoSystems Technology (WEST, Inc.) was contracted by NSP to develop an avian monitoring protocol for the Buffalo Ridge windplant. This protocol was developed and peer-reviewed by numerous individuals representing the wind energy industry, U.S. Fish and Wildlife Service, Minnesota Department of Natural Resources, and conservation groups prior to finalization. The WRA currently consists of three phases of development. Phase I, constructed by Kenetech in 1994, consists of 73 Model 33 M-VS turbines and related facilities, including distribution lines, meteorological towers, communication systems, transformers, substations, roads, and operations and maintenance facilities in the approximate center of the WRA, and generates 25 MW of electricity. Phase II, consisting of 143 turbines and related facilities sufficient to generate 100 MW of electricity, will be constructed by Zond Systems, Inc. beginning in the spring of 1997. Phase II will be located in the northwestern portion of the WRA. Phase III facilities capable of generating an additional 100 MW are planned for the southeast portion of the WRA. Plans call for the eventual production of 425 MW of electricity within the WRA. Studies were conducted in these three areas and a permanent reference area not scheduled for windpower development located along Buffalo Ridge northwest of the WRA in Brooking County South Dakota.

  6. System behaviour of compressed-air energy-storage in Denmark with a high penetration of renewable energy sources

    International Nuclear Information System (INIS)

    Salgi, Georges; Lund, Henrik

    2008-01-01

    In 2005, wind power supplied 19% of the 36 TWh annual electricity demand in Denmark, while 50% was produced at combined heat-and-power plants (CHP). The installed wind-turbine capacity in Western Denmark exceeds the local demand at certain points in time. So far, excess production has been exported to neighbouring countries. However, plans to expand wind power both in Denmark and in its neighbouring countries could restrain the export option and create transmission congestion challenges. This results in a need to increase the flexibility of the local electricity-system. Compressed-Air Energy-Storage (CAES) has been proposed as a potential solution for levelling fluctuating wind-power production and maintaining a system balance. This paper analyses the energy-balance effects of adding CAES to the Western Danish energy-system. Results show that even with an unlimited CAES plant capacity, excess power production is not eliminated because of the high percentage of CHP production. The optimal wind-power penetration for maximum CAES operation is found to be around 55%. The minimum storage size for CAES to fully eliminate condensing power plants operation in the optimized system is over 500 GWh, which corresponds to a cavern volume of around 234 Mm 3 at an average pressure of 60 bar. Such a storage size would be technically and economically unfeasible. The analysis, however, did not include the potential role of a CAES plant in regulating the power services. (author)

  7. Day-Ahead Probabilistic Model for Scheduling the Operation of a Wind Pumped-Storage Hybrid Power Station: Overcoming Forecasting Errors to Ensure Reliability of Supply to the Grid

    Directory of Open Access Journals (Sweden)

    Jakub Jurasz

    2018-06-01

    Full Text Available Variable renewable energy sources (VRES, such as solarphotovoltaic (PV and wind turbines (WT, are starting to play a significant role in several energy systems around the globe. To overcome the problem of their non-dispatchable and stochastic nature, several approaches have been proposed so far. This paper describes a novel mathematical model for scheduling the operation of a wind-powered pumped-storage hydroelectricity (PSH hybrid for 25 to 48 h ahead. The model is based on mathematical programming and wind speed forecasts for the next 1 to 24 h, along with predicted upper reservoir occupancy for the 24th hour ahead. The results indicate that by coupling a 2-MW conventional wind turbine with a PSH of energy storing capacity equal to 54 MWh it is possible to significantly reduce the intraday energy generation coefficient of variation from 31% for pure wind turbine to 1.15% for a wind-powered PSH The scheduling errors calculated based on mean absolute percentage error (MAPE are significantly smaller for such a coupling than those seen for wind generation forecasts, at 2.39% and 27%, respectively. This is even stronger emphasized by the fact that, those for wind generation were calculated for forecasts made for the next 1 to 24 h, while those for scheduled generation were calculated for forecasts made for the next 25 to 48 h. The results clearly show that the proposed scheduling approach ensures the high reliability of the WT–PSH energy source.

  8. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  9. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  10. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  11. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  12. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  13. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  14. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  15. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  16. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  17. Thermal Radiometer Signal Processing Using Radiation Hard CMOS Application Specific Integrated Circuits for Use in Harsh Planetary Environments

    Science.gov (United States)

    Quilligan, G.; DuMonthier, J.; Aslam, S.; Lakew, B.; Kleyner, I.; Katz, R.

    2015-01-01

    Thermal radiometers such as proposed for the Europa Clipper flyby mission require low noise signal processing for thermal imaging with immunity to Total Ionizing Dose (TID) and Single Event Latchup (SEL). Described is a second generation Multi- Channel Digitizer (MCD2G) Application Specific Integrated Circuit (ASIC) that accurately digitizes up to 40 thermopile pixels with greater than 50 Mrad (Si) immunity TID and 174 MeV-sq cm/mg SEL. The MCD2G ASIC uses Radiation Hardened By Design (RHBD) techniques with a 180 nm CMOS process node.

  18. Study of Power Options for Jupiter and Outer Planet Missions

    Science.gov (United States)

    Landis, Geoffrey A.; Fincannon, James

    2015-01-01

    Power for missions to Jupiter and beyond presents a challenging goal for photovoltaic power systems, but NASA missions including Juno and the upcoming Europa Clipper mission have shown that it is possible to operate solar arrays at Jupiter. This work analyzes photovoltaic technologies for use in Jupiter and outer planet missions, including both conventional arrays, as well as analyzing the advantages of advanced solar cells, concentrator arrays, and thin film technologies. Index Terms - space exploration, spacecraft solar arrays, solar electric propulsion, photovoltaic cells, concentrator, Fresnel lens, Jupiter missions, outer planets.

  19. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  20. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  1. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  2. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  3. Alternative wind power modeling methods using chronological and load duration curve production cost models

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M R

    1996-04-01

    As an intermittent resource, capturing the temporal variation in windpower is an important issue in the context of utility production cost modeling. Many of the production cost models use a method that creates a cumulative probability distribution that is outside the time domain. The purpose of this report is to examine two production cost models that represent the two major model types: chronological and load duration cure models. This report is part of the ongoing research undertaken by the Wind Technology Division of the National Renewable Energy Laboratory in utility modeling and wind system integration.

  4. On the structural behaviour of variable-geometry oval-trajectory Darrieus wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Otero, A.D. [College of Engineering, University of Buenos Aires, Paseo Colon 850, Buenos Aires C1063ACV (Argentina); Ponta, F.L. [Department of Mechanical Engineering - Engineering Mechanics, Michigan Technological University, 1400 Townsend Drive, Houghton, MI 49931 (United States)

    2009-03-15

    We developed a computational model based on a finite-element mixed formulation with quadratic isoparametric beam elements. We applied this model to the analysis of a blade-wagon: a novel structure characteristic of an innovative concept in wind-power called VGOT Darrieus turbine. We studied the structural behaviour of its main components: chassis, suspension and blade, using combinations of beam/bar elements in an appropriate assembling. We defined a set of parameters to characterize the structural behaviour which help to understand the contribution of the different components and assist the process of redesign. (author)

  5. Wind Energy

    International Nuclear Information System (INIS)

    Rodriguez D, J.M.

    1998-01-01

    The general theory of the wind energy conversion systems is presented. The availability of the wind resource in Colombia and the ranges of the speed of the wind in those which is possible economically to use the wind turbines are described. It is continued with a description of the principal technological characteristics of the wind turbines and are split into wind power and wind-powered pumps; and its use in large quantities grouped in wind farms or in autonomous systems. Finally, its costs and its environmental impact are presented

  6. Wind Energy Workforce: Who Are We Today and Where Do We Need to Go Tomorrow?

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, Suzanne

    2017-06-01

    Suzanne Tegen's presentation at the 2017 WINDPOWER Conference & Exhibition provided a description of the wind energy workforce by industry and occupation, a discussion of the level of difficulty in finding qualified applicants (from an industry survey), and an overview of the level of education preferred by people hiring for the industry. The presentation also covers available training programs and ways that the Energy Department and its National Renewable Energy Laboratory are working to bridge the gap in the industry and facilitate more motivated, well-educated wind industry workers.

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  8. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  9. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  10. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  11. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  12. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  13. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  14. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  15. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  16. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  17. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  18. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  19. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  1. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  2. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  3. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  4. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  5. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  8. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  9. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  10. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  11. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  12. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  13. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  14. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  15. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  16. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  17. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  18. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  19. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  20. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  1. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  2. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  3. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  4. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  5. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  6. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  7. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  8. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  9. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  10. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  11. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  12. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  13. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  14. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  15. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  16. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  17. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  18. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  19. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  20. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  1. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  2. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  3. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  4. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  5. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  6. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  7. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  8. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  9. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  10. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  11. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  12. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  13. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  14. Ultra advanced projects. ; Naming hyper-hightech projects. (Cho) no tsuku project. ; Naming no shikumi

    Energy Technology Data Exchange (ETDEWEB)

    Goto, Y. (Ministry of International Trade and Industry, Tokyo (Japan))

    1992-10-05

    Significance of using 'super' for naming a project of technological development is discussed. Functions of naming are classified into (1) recognition, (2) display and (3) sales-promotion, whereby mechanism of naming of merchandise that is developed through the technique of 3 is considered. Further, the mechanism of naming is discussed in relation to marketing. It is pointed out that naming of merchandise is determined on the basis of (1) concept of planned goods and (2) marketing-mixes composed of goods, price, sales-roots and sales-promotion. The same mechanism works also in a project for technological development. Technical trends are caught and projects are targetted by taking supposed regimes into account, thereby the most suitable mix is formed. The mix in the technological development is assumed to be composed of purpose, specification, regime and sales-promotion. Two examples of the governmental projects by Ministry of International Trade and Industry, 'the big regime for research and development on industrial technologies' and 'the regime for development of the fundamental technologies in the next generation' are introduced and the significance of their naming is described. 2 tabs.

  15. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  16. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  17. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  18. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  19. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  20. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  1. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  2. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  3. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  4. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  5. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  6. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  7. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  8. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  9. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  10. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  11. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  12. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  13. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  14. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  15. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  16. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  17. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  18. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  19. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  20. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  1. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  2. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  3. Desenvolvimento de um sistema computacional para dimensionamento e evolução de rebanhos bovinos Development of software for dimensioning and evolution of bovine herds

    Directory of Open Access Journals (Sweden)

    Marcos Aurélio Lopes

    2000-10-01

    Full Text Available Os objetivos deste estudo foram desenvolver um sistema computacional que efetue o dimensionamento e a evolução de rebanhos bovinos e criar uma ferramenta que possibilite ao usuário efetuar simulações em um sistema de produção de carne e/ou leite. Foi utilizada a linguagem CA Clipper. As rotinas foram desenvolvidas de forma conversacional, com acesso aos diversos programas, por meio de menus auto-explicativos. O sistema desenvolvido pode auxiliar o técnico e o pecuarista no dimensionamento e na evolução de um rebanho bovino com precisão e considerável rapidez; possibilita ao usuário efetuar inúmeras simulações; e constitui -se em importante ferramenta no auxílio da tomada de decisões.The objectives of this study were to develop a software that accomplishes both the dimensioning and evolution of cattle herds and develop a tool which makes it possible for the user to perform simulations with production systems of milk and or beef. The language employed was CA Clipper. The routines have been developed in a conversational form, with an access to the several programs by means of self-explicative menus. The developed system can aid both the technician and the raiser in dimensioning and evolution of a cattle herd with precision and outstanding rapidity; it allows to the user to perform a number of simulations; and it is considered an important tool in the assistance to decision-making.

  4. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  5. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  6. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  7. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  8. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  9. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  10. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  11. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  12. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  13. Environmental aspects of large-scale wind-power systems in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Robson, A

    1983-12-01

    Environmental issues relating to the introduction of large, MW-scale wind turbines at land-based sites in the U.K. are discussed. Areas of interest include noise, television interference, hazards to bird life and visual effects. A number of areas of uncertainty are identified, but enough is known from experience elsewhere in the world to enable the first U.K. machines to be introduced in a safe and environmentally acceptable manner. Research currently under way will serve to establish siting criteria more clearly, and could significantly increase the potential wind-energy resource. Certain studies of the comparative risk of energy systems are shown to be overpessimistic for U.K. wind turbines.

  14. Collision effects of wind-power generators and other obstacles on birds.

    Science.gov (United States)

    Drewitt, Allan L; Langston, Rowena H W

    2008-01-01

    There is extensive literature on avian mortality due to collision with man-made structures, including wind turbines, communication masts, tall buildings and windows, power lines, and fences. Many studies describe the consequences of bird-strike rather than address the causes, and there is little data based on long-term, standardized, and systematic assessments. Despite these limitations, it is apparent that bird-strike is a significant cause of mortality. It is therefore important to understand the effects of this mortality on bird populations. The factors which determine avian collision risk are described, including location, structural attributes, such as height and the use of lighting, weather conditions, and bird morphology and behavior. The results of incidental and more systematic observations of bird-strike due to a range of structures are presented and the implications of collision mortality for bird populations, particularly those of scarce and threatened species susceptible to collisions, are discussed. Existing measures for reducing collision mortality are described, both generally and specifically for each type of structure. It is concluded that, in some circumstances, collision mortality can adversely affect bird populations, and that greater effort is needed to derive accurate estimates of mortality levels locally, regionally, and nationally to better assess impacts on avian populations. Priority areas for future work are suggested, including further development of remote technology to monitor collisions, research into the causes of bird-strike, and the design of new, effective mitigation measures.

  15. Environmental aspects of large-scale wind-power systems in the UK

    Science.gov (United States)

    Robson, A.

    1984-11-01

    Environmental issues relating to the introduction of large, MW-scale wind turbines at land-based sites in the UK are discussed. Noise, television interference, hazards to bird life, and visual effects are considered. Areas of uncertainty are identified, but enough is known from experience elsewhere in the world to enable the first UK machines to be introduced in a safe and environementally acceptable manner. Research to establish siting criteria more clearly, and significantly increase the potential wind-energy resource is mentioned. Studies of the comparative risk of energy systems are shown to be overpessimistic for UK wind turbines.

  16. Power and Frequency Control as it Relates to Wind-Powered Generation

    Energy Technology Data Exchange (ETDEWEB)

    Lacommare, Kristina S H

    2010-12-20

    This report is a part of an investigation of the ability of the U.S. power system to accommodate large scale additions of wind generation. The objectives of this report are to describe principles by which large multi-area power systems are controlled and to anticipate how the introduction of large amounts of wind power production might require control protocols to be changed. The operation of a power system is described in terms of primary and secondary control actions. Primary control is fast, autonomous, and provides the first-line corrective action in disturbances; secondary control takes place on a follow-up time scale and manages the deployment of resources to ensure reliable and economic operation. This report anticipates that the present fundamental primary and secondary control protocols will be satisfactory as wind power provides an increasing fraction of the total production, provided that appropriate attention is paid to the timing of primary control response, to short term wind forecasting, and to management of reserves for control action.

  17. Multi-megawatt wind-power installations call for new, high-performance solutions

    International Nuclear Information System (INIS)

    2004-01-01

    This article discusses the development of increasingly powerful and profitable wind-energy installations for off-shore, on-shore and refurbishment sites. In particular, the rapid development of megawatt-class units is discussed. The latest products of various companies with rotor diameters of up to 120 metres and with power ratings of up to 5 MW are looked at and commented on. The innovations needed for the reduction of weight and the extreme demands placed on gearing systems are discussed. Also, the growing markets for wind energy installations in Europe and the United States are discussed and plans for new off-shore wind parks are looked at

  18. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  19. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  20. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  1. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  2. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  3. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  4. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  5. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  6. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  7. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  8. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  9. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  10. Recent improvements in program packages SHUFFLE and FAR

    International Nuclear Information System (INIS)

    Slavic, S.; Kromar, M.; Zefran, B.

    1996-01-01

    Program packages SHUFFLE and FAR were developed at 'Jozef Stefan' Institute to monitor all changes of fuel assemblies during a nuclear power plant operation. Both packages were written in the Clipper language which is suitable for data base applications and allows straightforward communications with other available data bases. Packages currently run on PC machines under DOS operating system. Both packages are in routine use at a nuclear power plant Krsko, but they can be applied to any PWR power plant without significant modification. Experiences obtained from the utility in past few years triggered several improvements and new features. (author)

  11. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  12. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  13. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  14. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  15. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  16. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  17. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  18. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  19. Case Studies of integrated hydrogen systems. International Energy Agency Hydrogen Implementing Agreement, Final report for Subtask A of task 11 - Integrated Systems

    Energy Technology Data Exchange (ETDEWEB)

    Schucan, T. [Paul Scherrer Inst., Villigen PSI (Switzerland)

    1999-12-31

    Demonstration Plant Research Centre, Juelich (FZJ) (Germany); Schatz Solar Hydrogen Project, Schatz Energy Research Centre, Humboldt State University (USA); INTA Solar Hydrogen Facility, INTA (Spain); Solar Hydrogen Fueled Trucks, Clean Air Now, Xerox (USA), Electrolyser (Canada); SAPHYS: Stand-Alone Small Size Photovoltaic Hydrogen Energy System, ENEA (Italy), IET (Norway), FZJ (Germany); Hydrogen Generation from Stand-Alone Wind-Powered Electrolysis Systems, RAL (United Kingdom), ENEA (Italy), DLR (Germany); Palm Desert Renewable Hydrogen Transportation Project; Schatz Energy Research Centre, City of Palm Desert (USA). Other demonstration projects are summarized in chapter 11.

  20. Jet spoiler arrangement for wind turbine

    Science.gov (United States)

    Cyrus, J. D.; Kablec, E. G.; Klimas, P. C.

    1983-09-01

    An air jet spoiler arrangement is provided for a Darrieus-type vertical axis wind-powered turbine. Air is drawn into hollow turbine blades through air inlets at the end thereof and is ejected in the form of air jets through small holes or openings provided along the lengths of the blades. The air jets create flow separation at the surfaces of the turbine blades, thereby including stal conditions and reducing the output power. A feedback control unit senses the power output of the turbine and controls the amount of air drawn into the air inlets accordingly.

  1. Jet spoiler arrangement for wind turbine

    Science.gov (United States)

    Cyrus, Jack D.; Kadlec, Emil G.; Klimas, Paul C.

    1985-01-01

    An air jet spoiler arrangement is provided for a Darrieus-type vertical axis wind-powered turbine. Air is drawn into hollow turbine blades through air inlets at the ends thereof and is ejected in the form of air jets through small holes or openings provided along the lengths of the blades. The air jets create flow separation at the surfaces of the turbine blades, thereby inducing stall conditions and reducing the output power. A feedback control unit senses the power output of the turbine and controls the amount of air drawn into the air inlets accordingly.

  2. On the energy pattern factor in wind measurements

    Energy Technology Data Exchange (ETDEWEB)

    Buick, T R; Doherty, M A; McMullan, J.T., Morgan, R.; Murray, R B

    1977-01-01

    Measurements of energy pattern factor K/sub e/ were made using a continuous-analogue wind-power metering technique, rather than by the more usual sampling procedure. The values obtained were significantly larger than the usually accepted figure. The discrepancy is attributed partly to the method of measurement, which includes the actual power present rather than the amount that can be extracted, and partly to the use of rather more typical wind speeds. It is concluded, however, that more energy can be derived from wind schemes than was thought, even during periods of light wind. These conclusions improve the viability of wind power plants.

  3. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  4. The Impact of Project Manager on Project Success – The Case of ICT Sector

    OpenAIRE

    Blaskovics, Bálint

    2016-01-01

    The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand f...

  5. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  6. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  7. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  8. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  9. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  10. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  11. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  12. When Failure Means Success: Accepting Risk in Aerospace Development

    Science.gov (United States)

    Dumbacher, Daniel L.; Singer, Christopher E.

    2009-01-01

    Over the last three decades, NASA has been diligent in qualifying systems for human space flight. As the Agency transitions from operating the Space Shuttle, its employees must learn to accept higher risk levels to generate the data needed to certify its next human space flight system. The Marshall Center s Engineering workforce is developing the Ares I crew launch vehicle and designing the Ares V cargo launch vehicle for safety, reliability, and cost-effective operations. This presentation will provide a risk retrospective, using first-hand examples from the Delta Clipper-Experimental Advanced (DC-XA) and the X-33 single-stage-to-orbit flight demonstrators, while looking ahead to the upcoming Ares I-X uncrewed test flight. The DC-XA was successfully flown twice in 26 hours, setting a new turnaround-time record. Later, one of its 3 landing gears did not deploy, it tipped over, and was destroyed. During structural testing, the X-33 s advanced composite tanks were unable to withstand the forces to which it was subjected and the project was later cancelled. These are examples of successful failures, as the data generated are captured in databases used by vehicle designers today. More recently, the Ares I-X flight readiness review process was streamlined in keeping with the mission's objectives, since human lives are not at stake, which reflects the beginning of a cultural change. Failures are acceptable during testing, as they provide the lessons that actually lead to mission success. These and other examples will stimulate the discussion of when to accept risk in aerospace projects.

  13. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  14. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  15. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  16. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  17. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  18. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  19. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  20. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)