WorldWideScience

Sample records for project area encompasses

  1. Educational NASA Computational and Scientific Studies (enCOMPASS)

    Science.gov (United States)

    Memarsadeghi, Nargess

    2013-01-01

    Educational NASA Computational and Scientific Studies (enCOMPASS) is an educational project of NASA Goddard Space Flight Center aimed at bridging the gap between computational objectives and needs of NASA's scientific research, missions, and projects, and academia's latest advances in applied mathematics and computer science. enCOMPASS achieves this goal via bidirectional collaboration and communication between NASA and academia. Using developed NASA Computational Case Studies in university computer science/engineering and applied mathematics classes is a way of addressing NASA's goals of contributing to the Science, Technology, Education, and Math (STEM) National Objective. The enCOMPASS Web site at http://encompass.gsfc.nasa.gov provides additional information. There are currently nine enCOMPASS case studies developed in areas of earth sciences, planetary sciences, and astrophysics. Some of these case studies have been published in AIP and IEEE's Computing in Science and Engineering magazines. A few university professors have used enCOMPASS case studies in their computational classes and contributed their findings to NASA scientists. In these case studies, after introducing the science area, the specific problem, and related NASA missions, students are first asked to solve a known problem using NASA data and past approaches used and often published in a scientific/research paper. Then, after learning about the NASA application and related computational tools and approaches for solving the proposed problem, students are given a harder problem as a challenge for them to research and develop solutions for. This project provides a model for NASA scientists and engineers on one side, and university students, faculty, and researchers in computer science and applied mathematics on the other side, to learn from each other's areas of work, computational needs and solutions, and the latest advances in research and development. This innovation takes NASA science and

  2. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  3. Nevada Test Site Area 25, Radiological Survey and Cleanup Project, 1974-1983 (a revised final report). Revision 1

    International Nuclear Information System (INIS)

    Miller, M.G.

    1984-12-01

    This report describes the radiological survey, decontamination and decommissioning (D and D) of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for beta plus gamma and alpha radioactive contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 9 references, 23 figures

  4. 75 FR 9388 - Prescott National Forest, Bradshaw Ranger District; Arizona; Bradshaw Vegetation Management Project

    Science.gov (United States)

    2010-03-02

    ...; Arizona; Bradshaw Vegetation Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: This project is a proposal to improve the health of.... The project area encompasses about 55,554 acres. Within the project area, the proposal is to...

  5. An all-encompassing study of an authentic court setting

    DEFF Research Database (Denmark)

    Christensen, Tina Paulsen

    necessarily be judged from a particular (subjective) perspective on the communicative event. In this paper I shall address the issue of interpreting quality in an all-encompassing perspective on an authentic Danish courtroom setting. The aim of the empirical case-based survey is unlike that of most existing...... but homogeneous. Several empirical studies, which have been carried out on this subject, have shown that different user groups have different expectations about the interpreted communicative event, which ceteris paribus means that user expectations are heterogeneous. The question is, whether the heterogeneity......, which are to be considered as expectancy norms projected and recommended by the specific legal system. In order to be able to answer this question, a questionnaire-based survey on specific quality criteria has been conducted within an authentic interpreter-mediated court setting, because, according...

  6. Driftless Area Initiative Biomass Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Angie [Northeast Iowa Resource Conservation & Development, Inc., Postville, IA (United States); Bertjens, Steve [Natural Resources Conservation Service, Madison, WI (United States); Lieurance, Mike [Northeast Iowa Resource Conservation & Development, Inc., Postville, IA (United States); Berguson, Bill [Univ. of Minnesota, Minneapolis, MN (United States). Natural Resources Research Inst.; Buchman, Dan [Univ. of Minnesota, Minneapolis, MN (United States). Natural Resources Research Inst.

    2012-12-31

    The Driftless Area Initiative Biomass Energy Project evaluated the potential for biomass energy production and utilization throughout the Driftless Region of Illinois, Iowa, Minnesota and Wisconsin. The research and demonstration aspect of the project specifically focused on biomass energy feedstock availability and production potential in the region, as well as utilization potential of biomass feedstocks for heat, electrical energy production, or combined heat and power operations. The Driftless Region was evaluated because the topography of the area offers more acres of marginal soils on steep slopes, wooded areas, and riparian corridors than the surrounding “Corn Belt”. These regional land characteristics were identified as potentially providing opportunity for biomass feedstock production that could compete with traditional agriculture commodity crops economically. The project researched establishment methods and costs for growing switchgrass on marginal agricultural lands to determine the economic and quantitative feasibility of switchgrass production for biomass energy purposes. The project was successful in identifying the best management and establishment practices for switchgrass in the Driftless Area, but also demonstrated that simple economic payback versus commodity crops could not be achieved at the time of the research. The project also analyzed the availability of woody biomass and production potential for growing woody biomass for large scale biomass energy production in the Driftless Area. Analysis determined that significant resources exist, but costs to harvest and deliver to the site were roughly 60% greater than that of natural gas at the time of the study. The project contributed significantly to identifying both production potential of biomass energy crops and existing feedstock availability in the Driftless Area. The project also analyzed the economic feasibility of dedicated energy crops in the Driftless Area. High commodity crop prices

  7. Can Static Habitat Protection Encompass Critical Areas for Highly Mobile Marine Top Predators? Insights from Coastal East Africa.

    Directory of Open Access Journals (Sweden)

    Sergi Pérez-Jorge

    Full Text Available Along the East African coast, marine top predators are facing an increasing number of anthropogenic threats which requires the implementation of effective and urgent conservation measures to protect essential habitats. Understanding the role that habitat features play on the marine top predator' distribution and abundance is a crucial step to evaluate the suitability of an existing Marine Protected Area (MPA, originally designated for the protection of coral reefs. We developed species distribution models (SDM on the IUCN data deficient Indo-Pacific bottlenose dolphin (Tursiops aduncus in southern Kenya. We followed a comprehensive ecological modelling approach to study the environmental factors influencing the occurrence and abundance of dolphins while developing SDMs. Through the combination of ensemble prediction maps, we defined recurrent, occasional and unfavourable habitats for the species. Our results showed the influence of dynamic and static predictors on the dolphins' spatial ecology: dolphins may select shallow areas (5-30 m, close to the reefs (< 500 m and oceanic fronts (< 10 km and adjacent to the 100 m isobath (< 5 km. We also predicted a significantly higher occurrence and abundance of dolphins within the MPA. Recurrent and occasional habitats were identified on large percentages on the existing MPA (47% and 57% using presence-absence and abundance models respectively. However, the MPA does not adequately encompass all occasional and recurrent areas and within this context, we propose to extend the MPA to incorporate all of them which are likely key habitats for the highly mobile species. The results from this study provide two key conservation and management tools: (i an integrative habitat modelling approach to predict key marine habitats, and (ii the first study evaluating the effectiveness of an existing MPA for marine mammals in the Western Indian Ocean.

  8. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  9. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  10. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  11. A theoretical framework for an access programme encompassing ...

    African Journals Online (AJOL)

    A theoretical framework for an access programme encompassing further education training: remedy for educational wastage? ... learners who have dropped out of school without completing their secondary-school education, there are the special needs of adult learners in the workplace that must be taken into consideration.

  12. Hydrogeological and Groundwater Flow Model for C, K, L, and P Reactor Areas, Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    Flach, G.P.

    1999-01-01

    A regional groundwater flow model encompassing approximately 100 mi 2 surrounding the C, K. L. and P reactor areas has been developed. The Reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department

  13. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  14. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  15. Encompassing Sexual Medicine within Psychiatry: Pros and Cons

    Science.gov (United States)

    Segraves, Robert Taylor

    2010-01-01

    Objective: This article examines the positive and negative aspects of psychiatry encompassing sexual medicine within its purview. Methods: MEDLINE searches for the period between 1980 to the present were performed with the terms "psychiatry," "sexual medicine," and "sexual dysfunction." In addition, sexual medicine texts were reviewed for chapters…

  16. Hydrogeological and Groundwater Flow Model for C, K, L, and P Reactor Areas, Savannah River Site, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G.P.

    1999-02-24

    A regional groundwater flow model encompassing approximately 100 mi{sup 2} surrounding the C, K. L. and P reactor areas has been developed. The Reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department.

  17. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  18. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  19. Area 5 Site characterization project report, FY 1994

    International Nuclear Information System (INIS)

    Albright, W.; Tyler, S.; Chapman, J.; Miller, M.; Estrella, R.

    1994-09-01

    The Area 5 Site Characterization Project is designed to determine the suitability of the Radioactive Waste Management Site (RWMS) for disposal of low-level waste (LLW), mixed waste (MW) and transuranic waste (TRU). The Desert Research institute (DRI) has conducted this study for the Area 5 Site Characterization Project for the US Department of Energy, Nevada Operations Office (DOE/NV), Waste Management Division (WMD). The purpose of DRI's Area 5 Site Characterization Project is to characterize important properties of the upper vadose zone which influence infiltration and redistribution of water and transport of solutes as well as to characterize the water quality and hydrologic conditions of the uppermost aquifer. This report describes methods and presents a summary of all data and results from laboratory physical and chemical testing from borehole samples through September 1994. DRI laboratories performed soil water content, soil water potential, soil bulk density, and soil water extract isotope analyses

  20. Management of a science and technology popularization project in the nuclear area

    Energy Technology Data Exchange (ETDEWEB)

    Soares, Wellington Antonio; Maretti Junior, Fausto [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)]. E-mail: soaresw@cdtn.br; fmj@cdtn.br

    2007-07-01

    The goal of this paper is to show the management results of the 2005-2007 project 'Nuclear energy: itinerant expositions' sponsored by the Foundation for Research Support of Minas Gerais (FAPEMIG), a state agency, in a science and technology popularization program. The project coordinated by the Nuclear Technology Development Center (CDTN/CNEN) in partnership with the Minas Commerce Association (ACMinas) was designed to students from public high school of the Belo Horizonte metropolitan region. It consisted of an exposition and a previous talk motivating the audience to the nuclear technology in connection with subjects taught at schools, like physics, chemistry, biology, mathematics, history, etc. Small scale models of nuclear and radioactive installations, irradiated food and fruits samples and colored gems by gamma rays were presented at the stand exposition. Designing, performing and evaluating the project required the following activities: searching of information on the target public, infrastructure mounting, team training, multimedia material elaboration, strategy for dealing with the students, talk presentation, distribution of booklet on nuclear themes, reception at the exposition, interviews with students and teachers by journalists, evaluation of the project by the schools, evaluation of the project by some students three months after the event and also reporting the project to the media. About forty people of CDTN took part in the project that reached thirty high schools and encompassed about 11,000 students. About five hundred state high school teachers of chemistry, physics and biology were reached by the experience of the project in a specialization course given by a local university. Only high approval was received by the project in the returned questionnaires. (author)

  1. Management of a science and technology popularization project in the nuclear area

    International Nuclear Information System (INIS)

    Soares, Wellington Antonio; Maretti Junior, Fausto

    2007-01-01

    The goal of this paper is to show the management results of the 2005-2007 project 'Nuclear energy: itinerant expositions' sponsored by the Foundation for Research Support of Minas Gerais (FAPEMIG), a state agency, in a science and technology popularization program. The project coordinated by the Nuclear Technology Development Center (CDTN/CNEN) in partnership with the Minas Commerce Association (ACMinas) was designed to students from public high school of the Belo Horizonte metropolitan region. It consisted of an exposition and a previous talk motivating the audience to the nuclear technology in connection with subjects taught at schools, like physics, chemistry, biology, mathematics, history, etc. Small scale models of nuclear and radioactive installations, irradiated food and fruits samples and colored gems by gamma rays were presented at the stand exposition. Designing, performing and evaluating the project required the following activities: searching of information on the target public, infrastructure mounting, team training, multimedia material elaboration, strategy for dealing with the students, talk presentation, distribution of booklet on nuclear themes, reception at the exposition, interviews with students and teachers by journalists, evaluation of the project by the schools, evaluation of the project by some students three months after the event and also reporting the project to the media. About forty people of CDTN took part in the project that reached thirty high schools and encompassed about 11,000 students. About five hundred state high school teachers of chemistry, physics and biology were reached by the experience of the project in a specialization course given by a local university. Only high approval was received by the project in the returned questionnaires. (author)

  2. Hanford Area 1990 population and 50-year projections

    International Nuclear Information System (INIS)

    Beck, D.M.; Scott, M.J.; Shindle, S.F.; Napier, B.A.; Thurman, A.G.; Batishko, N.C.; Davis, M.D.; Pittenger, D.B.

    1991-10-01

    The complex and comprehensive safety analysis activities carried out at Hanford for nonreactor nuclear facilities require data from a number of scientific and engineering disciplines. The types of data that are required include data pertaining to current population and population projections. The types of data found in this document include 1990 census totals for residential population within a 50-mile radius of the 100-N, 200, 300, and 400 Area meteorological towers. This document also contains 50-year projections for residential populations within a 50-mile radius of these four meteorological towers. The analysis of population projections indicates that residential population within a 50-mile radius of the four meteorological towers in question will continue to grow through 2040, although at a slower rate each decade. In all cases, the highest growth is projected for the decade ending in the year 2000. The annual growth rate for this period is projected to be 0.646, 0.633, 0.543, and 0.570 in the 100-N, 200, 300, and 400 Areas, respectively. By 2040, these growth rates are projected to drop to 0.082, 0.068, 0.078, 0.078, respectively. 4 refs., 1 figs., 4 tabs

  3. Futures project anticipates changes and challenges facing forests of the northern United States

    Science.gov (United States)

    Stephen R. Shifley; W. Keith Moser; Michael E. Goerndt; Nianfu Song; Mark D. Nelson; David J. Nowak; Patrick D. Miles; Brett J. Butler; Ryan D. DeSantis; Francisco X. Aguilar; Brian G. Tavernia

    2014-01-01

    The Northern Forest Futures Project aims to reveal how today's trends and choices are likely to change the future forest landscape in the northeastern and midwestern United States. The research is focused on the 20-state quadrant bounded by Maine, Maryland, Missouri, and Minnesota. This area, which encompasses most of the Central Hardwood Forest region, is the...

  4. A whole stand basal area projection model for Appalachian hardwoods

    Science.gov (United States)

    John R. Brooks; Lichun Jiang; Matthew Perkowski; Benktesh Sharma

    2008-01-01

    Two whole-stand basal area projection models were developed for Appalachian hardwood stands. The proposed equations are an algebraic difference projection form based on existing basal area and the change in age, trees per acre, and/or dominant height. Average equation error was less than 10 square feet per acre and residuals exhibited no irregular trends.

  5. South Carolina: Charleston County Area Project Impact Environmental Education Program (A Former EPA CARE Project)

    Science.gov (United States)

    The Charleston County Area Project Impact is the recipient of a Level II CARE cooperative agreement. The project is under the direction of the Charleston County Building Services Department, in Charleston, S.C.

  6. Tuberculosis in cattle: the results of the four-area project

    Directory of Open Access Journals (Sweden)

    Griffin John M

    2005-11-01

    Full Text Available The four-area project was undertaken to further assess the impact of badger removal on the control of tuberculosis in cattle herds in Ireland. It was conducted between 1997 and 2002 in matched removal and reference areas in four counties, namely Cork, Donegal, Kilkenny and Monaghan, representing a wide range of Irish farming environments. In the removal areas, a proactive programme of badger removal was conducted, on two or three occasions each year, whereas in the reference areas, badger removal was entirely reactive following severe outbreaks of tuberculosis amongst cattle. A detailed statistical analysis of this study has already been presented by Griffin et al. 13; this paper presents further, mainly descriptive, findings from the study. In total, 2,360 badgers were captured in the removal areas of which 450 (19.5% were considered positive for tuberculosis and 258 badgers were captured in the reference areas, with 57 (26.1% positive for tuberculosis. The annual incidence of confirmed herd restrictions was lower in the removal area compared to the reference area in every year of the study period in each of the four counties. These empirical findings were consistent with the hazard ratios found by Griffin et al. 13. Further, the effect of proactive badger removal on cattle tuberculosis in the four-area project and in the earlier east-Offaly project, as measured using the number of reactors per 1,000 cattle tested, were very similar, providing compelling evidence of the role of badgers in the epidemiology of tuberculosis in Irish cattle herds. The validity of the four-area project was discussed in detail. Efforts to minimise badger-to-cattle transmission in Ireland must be undertaken in association with the current comprehensive control programme, which has effectively minimised opportunities for cattle-to-cattle transmission.

  7. Projections to early visual areas V1 and V2 in the calcarine fissure from parietal association areas in the macaque.

    Directory of Open Access Journals (Sweden)

    Elena eBorra

    2011-06-01

    Full Text Available Non-extrastriate projections to area V1 in monkeys, now demonstrated by several anatomical studies, are potential substrates of physiologically documented multisensory effects in primary sensory areas. The full network of projections among association and primary areas, however, is likely to be complex and is still only partially understood. In the present report, we used the anterograde tracer biotinylated dextran amine to investigate projections to areas V1 and V2 from subdivisions of the parietal association cortex in macaque. Parietal cortex was chosen to allow comparisons between projections from this higher association area and from other previously reported areas. In addition, we were interested in further elucidating pathways to areas V1 and V2 from parietal areas, as potentially contributing to attention and active vision. Of eight cases, three brains had projections only to area V2, and the five others projected to both areas V1 and V2. Terminations in area V1 were sparse. These were located in supragranular layers I, II, upper III; occasionally in IVB; and in layer VI. Terminations in V2 were denser, and slightly more prevalent in the supragranular layers. For both areas, terminations were in the calcarine region, corresponding to the representation of the peripheral visual field. By reconstructions of single axons, we demonstrated that four of nine axons had collaterals, either to V1 and V2 (n=1 or to area V1 and a ventral area likely to be TEO (n=3. In area V1, axons extended divergently in layer VI as well as layer I. Overall, these and previous results suggest a nested connectivity architecture, consisting of multiple direct and indirect recurrent projections from association areas to area V1. Terminations in area V1 are not abundant, but could be potentiated by the network of indirect connections.

  8. ANALYSIS OF INVESTMENT ATTRACTIVENESS REDEVELOPMENT PROJECTS THE INDUSTRIAL AREAS IN KIEV

    Directory of Open Access Journals (Sweden)

    Yevsyukov T. O.

    2017-08-01

    Full Text Available At the present stage of development of land relations in major cities of our country important issue is the development of investment, attract and use foreign investment. According to the Law of Ukraine "On investment activity" under the investment necessary to understand "all types of property and intellectual values invested in business and other activities, which resulted in creating profit (income or social effect is achieved." For the economy of any city, including the city. Kyiv and development of urban land use, renovation of industrial areas deindustrialization of inefficient production centers, it is extremely important investment activity (foreign investment as one of the most effective mechanisms for the development and activities of national companies. The purpose of the article to analyze the investment attractiveness of the redevelopment projects of industrial areas to economic development of eco-industrial land use in Kiev, despite the downward trend in investment activity of domestic enterprises, the need for technical and technological modernization of production as well as the entire market infrastructure, redevelopment of industrial areas. Redevelopment areas – this is a comprehensive activity aimed at changing the existing construction work carried out with the help of large investments (investments in reconstruction; renovation of; overhaul; demolition; conversion; improving the environment, which results in a positive effect on economic, social and environmental aspects. Investment and construction projects related to redevelopment of industrial land use (objects in the management of the city, characterized by considerable risks given the high capital intensity, binding to a specific area, and the impact of other internal and external factors. That is why this investment activity should be ensured exceptional dynamic management to ensure the quality of implementation and the necessary level of profitability and

  9. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  10. The ADVANCE project: Insights and achievments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    ADVANCE [Advanced Driver and Vehicle Advisory Navigation ConcEpt] was a public/private partnership conceived and developed by four founding parties. The founding parties include the Federal Highway Administration (FHWA), the Illinois Department of Transportation (IDOT), the University of Illinois at Chicago and Northwestern University operating together under the auspices of the Illinois Universities Transportation Research Consortium (IUTRC), and Motorola, Inc. The major responsibilities of each party are fully described in the Project agreement. Subsequently, these four were joined on the Steering Committee by the American Automobile Association (AAA). This unique blending of public sector, private sector and university interests, augmented by more than two dozen other private sector participants, provided a strong set of resources for ADVANCE. The ADVANCE test area covered over 300 square miles including portions of the City of Chicago and 40 northwest suburban communities. The Project encompasses the high growth areas adjacent to O`Hare International Airport, the Schaumburg/Hoffman Estates office and retail complexes, and the Lake-Cook Road development corridor. It also includes major sports and entertainment complexes such as the Arlington International Racecourse and the Rosemont Horizon. The population in the area is more than 750,000. The Insights and Perspectives Compendium is intended to provide useful information to project managers, system developers, and system integrators of future similar ITS implementations. It is intended for those that are technically interested in the ADVANCE Project and have a basic understanding of the project.

  11. Groundwater-Surface water interaction in agricultural watershed that encompasses dense network of High Capacity wells

    Science.gov (United States)

    Talib, A.; Desai, A. R.

    2017-12-01

    The Central Sands region of Wisconsin is characterized by productive trout streams, lakes, farmland and forest. However, stream channelization, past wetland drainage, and ground water withdrawals have disrupted the hydrology of this Central Sands region. Climatically driven conditions in last decade (2000-2008) alone are unable to account for the severely depressed water levels. Increased interception and evapotranspiration from afforested areas in central sand Wisconsin may also be culprit for reduced water recharge. Hence, there is need to study the cumulative effects of changing precipitation patterns, groundwater withdrawals, and forest evapotranspiration to improve projections of the future of lake levels and water availability in this region. Here, the SWAT-MODFLOW coupled model approach was applied at large spatio-temporal scale. The coupled model fully integrates a watershed model (SWAT) with a groundwater flow model (MODFLOW). Surface water and ground water flows were simulated integratively at daily time step to estimate the groundwater discharge to the stream network in Central Sands that encompasses high capacity wells. The model was calibrated (2010-2013) and validated (2014-2017) based on streamflow, groundwater extraction, and water table elevation. As the long-term trends in some of the primary drivers is presently ambiguous in Central Sands under future climate, as is the case for total precipitation or timing of precipitation, we relied on a sensitivity student to quantitatively access how primary and secondary drivers may influence future net groundwater recharge. We demonstrate how such an approach could then be coupled with decision-making models to evaluate the effectiveness of groundwater withdrawal policies under a changing climate.

  12. 76 FR 33333 - Use of Small Area Fair Market Rents for Project Base Vouchers in the Dallas TX Metropolitan Area

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5525-N-01] Use of Small Area Fair Market Rents for Project Base Vouchers in the Dallas TX Metropolitan Area AGENCY: Office of the Assistant... Small Area Fair Market Rents (SAFMRs) for Project-Based Vouchers (PBVs) located in the Dallas, TX...

  13. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Science.gov (United States)

    2011-10-17

    ... Resource Pool; Loveland Area Projects, General Eligibility Criteria. The resource pool for capacity and... transmission in Kansas. Final allocation of the Post-2014 Resource Pool; Loveland Area Projects, is contingent...

  14. An Aerial Radiological Survey of the Yucca Mountain Project Proposed Land Withdrawal and Adjacent Areas

    International Nuclear Information System (INIS)

    Craig Lyons, Thane Hendricks

    2006-01-01

    An aerial radiological survey of the Yucca Mountain Project (YMP) proposed land withdrawal was conducted from January to April 2006, and encompassed a total area of approximately 284 square miles (73,556 hectares). The aerial radiological survey was conducted to provide a sound technical basis and rigorous statistical approach for determining the potential presence of radiological contaminants in the Yucca Mountain proposed Land withdrawal area. The survey site included land areas currently managed by the Bureau of Land Management, the U.S. Air Force as part of the Nevada Test and Training Range or the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as part of the Nevada Test Site (NTS). The survey was flown at an approximate ground speed of 70 knots (36 meters per second), at a nominal altitude of 150 ft (46 m) above ground level, along a set of parallel flight lines spaced 250 ft (76 m) apart. The flight lines were oriented in a north-south trajectory. The survey was conducted by the DOE NNSA/NSO Remote Sensing Laboratory-Nellis, which is located in Las Vegas, Nevada. The aerial survey was conducted at the request of the DOE Office of Civilian Radioactive Waste Management. The primary contaminant of concern was identified by YMP personnel as cesium-137 ( 137 Cs). Due to the proposed land withdrawal area's proximity to the historical Nuclear Rocket Development Station (NRDS) facilities located on the NTS, the aerial survey system required sufficient sensitivity to discriminate between dispersed but elevated 137 Cs levels from those normally encountered from worldwide fallout. As part of that process, the survey also measured and mapped the exposure-rate levels that currently existed within the survey area. The inferred aerial exposure rates of the natural terrestrial background radiation varied from less than 3 to 22 microroentgens per hour. This range of exposure rates was primarily due to the surface

  15. Indian areas threatened by hydroelectric projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Aspelin, P L; Santos, S.C. dos

    1981-10-01

    In Brazil, as elsewhere, high priority is being given to developing domestic energy sources due to the spectacular increase in the cost of imported petroleum in recent years. This paper discusses the present situation of the thirty-two to thirty-four various Indian areas presently known to be threatened by seven major hydro-electric projects and one flood-control project, either planned or underway, in or directly involving Brazil. A total of at least 100,000 hectares of Indian land (or nearly one hectare for each remaining Brazilian Indian) will be flooded or otherwise expropriated by these projects. Past efforts by the Brazilian National Indian Foundation (FUNAI) to protect the Indians from the pressure of ''national development'' have not been sufficient. Research, planning, publicity, and political pressure are necessary to ensure that their efforts regarding these hydroelectric projects are more successful.

  16. Human projected area factors for detailed direct and diffuse solar radiation analysis

    DEFF Research Database (Denmark)

    Kubaha, K.; Fiala, D.; Toftum, Jørn

    2004-01-01

    Projected area factors for individual segments of the standing and sedentary human body were modelled for both direct and diffuse solar radiation using detailed 3D geometry and radiation models. The local projected area factors with respect to direct short-wave radiation are a function of the solar...

  17. Key Success Factors of Renewable Energy Projects Implementation in Rural Areas of Indonesia

    Directory of Open Access Journals (Sweden)

    Wati Hermawati

    2017-12-01

    Full Text Available This paper is an exploratory study on renewable energy implementation in the rural areas of Indonesia. The study aim was to investigate the factors contributing to the sustainability of renewable energy projects in the rural areas. It mostly uses a qualitative approach. Primary data was mainly obtained from in-depth interviews conducted in site areas with the project owners, project managers, a key person in each local government, industry representatives, and the local community, including local leaders and users of renewable energy. Secondary data in the form of various official project reports was also used. The results indicated that the success of energy project implementation lay not only in good technology performance and long-term maintenance, but was also highly dependent on six key factors, namely: (1 project planning and development; (2 community participation; (3 active communication and beneficiaries; (4 availability of maintenance program, workshop and technician; (5 project management and institutionalization; (6 local government support and networks. The findings from this study provide useful insights to all stakeholders involved in the implementation of renewable energy technology for the rural areas in Indonesia.

  18. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  19. The Sphagnome Project: enabling ecological and evolutionary insights through a genus-level sequencing project.

    Science.gov (United States)

    Weston, David J; Turetsky, Merritt R; Johnson, Matthew G; Granath, Gustaf; Lindo, Zoë; Belyea, Lisa R; Rice, Steven K; Hanson, David T; Engelhardt, Katharina A M; Schmutz, Jeremy; Dorrepaal, Ellen; Euskirchen, Eugénie S; Stenøien, Hans K; Szövényi, Péter; Jackson, Michelle; Piatkowski, Bryan T; Muchero, Wellington; Norby, Richard J; Kostka, Joel E; Glass, Jennifer B; Rydin, Håkan; Limpens, Juul; Tuittila, Eeva-Stiina; Ullrich, Kristian K; Carrell, Alyssa; Benscoter, Brian W; Chen, Jin-Gui; Oke, Tobi A; Nilsson, Mats B; Ranjan, Priya; Jacobson, Daniel; Lilleskov, Erik A; Clymo, R S; Shaw, A Jonathan

    2018-01-01

    Considerable progress has been made in ecological and evolutionary genetics with studies demonstrating how genes underlying plant and microbial traits can influence adaptation and even 'extend' to influence community structure and ecosystem level processes. Progress in this area is limited to model systems with deep genetic and genomic resources that often have negligible ecological impact or interest. Thus, important linkages between genetic adaptations and their consequences at organismal and ecological scales are often lacking. Here we introduce the Sphagnome Project, which incorporates genomics into a long-running history of Sphagnum research that has documented unparalleled contributions to peatland ecology, carbon sequestration, biogeochemistry, microbiome research, niche construction, and ecosystem engineering. The Sphagnome Project encompasses a genus-level sequencing effort that represents a new type of model system driven not only by genetic tractability, but by ecologically relevant questions and hypotheses. © 2017 UT-Battelle New Phytologist © 2017 New Phytologist Trust.

  20. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  1. Regional energy projects in the Eurasian Area

    Directory of Open Access Journals (Sweden)

    Vesić Dobrica

    2012-03-01

    Full Text Available The Eurasian area has a very rich energy reserves, and is characterized by a complex network of relationships between major suppliers and consumers. The central place in this area has Russia as a country richest in energy resources in Eurasia. Beside her, the European Union is the largest economic and political grouping in the world, and a huge consumer of energy. The dynamic development of Chinese economy requires more energy imports by China. Dependence of the European Union and China on imported energy is high and will grow in the future. Russia is the world's dominant natural gas producer and one of the two largest oil producers in the world. Russia is the largest natural gas supplier of the EU and a significant oil and natural gas supplier of China. Energy projects in Eurasia are the result of the need to strengthen the stability of energy supplies, efforts to diversify sources of supply, and the geographic redistribution of Russian oil and gas exports. Although the interests of the main actors often do not agree, the reasons of energy security affect the development of joint energy projects.

  2. Production and reception of meaningful sound in Foville's 'encompassing convolution'.

    Science.gov (United States)

    Schiller, F

    1999-04-01

    In the history of neurology. Achille Louis Foville (1799-1879) is a name deserving to be remembered. In the course of time, his circonvolution d'enceinte of 1844 (surrounding the Sylvian fissure) became the 'convolution encompassing' every aspect of aphasiology, including amusia, ie., the localization in a coherent semicircle of semicircle of cerebral cortext serving the production and perception of language, song and instrumental music in health and disease.

  3. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    International Nuclear Information System (INIS)

    Hinchman, R.R.; Zellmer, S.D.; Brent, J.J.

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely

  4. DEVELOPMENT POLICIES IN ALBA IULIA AREA OF INFLUENCE. AN INTEGRATED APPROACH

    Directory of Open Access Journals (Sweden)

    S. A. NICULA

    2015-06-01

    Full Text Available Development Policies in Alba Iulia Area of Influence. An Integrated Approach. The paper represents an integrated and holarchical perspective on the spatial development policies and its component measures and projects related to the City of Alba Iulia, its area of influence and the all-encompassing County of Alba, Romania. The goal was to see how the development and management policies from all levels merge into a single strategic framework that might create a favourable basis for the sustainable growth of Alba Iulia and its area of influence. As this area surrounding the city is subjected to different hierarchical plans and programmes, some that are not properly correlated, it is extremely clear that this area and Areas of Influence in general need legislative stipulations made specifically for them and also a well-thought holarchical planning approach.

  5. Protected areas and wildlife management in Myanmar

    International Nuclear Information System (INIS)

    Thein Lwin

    1993-01-01

    Myanmar embraces diverse geophysical features from the sea in the south to the snow-capped mountains in the north. Wildlife conservation is not new to Myanmar and it dated back to about 1859, the period of the last dynasty of Myanmar Kings. Myanmar is strongly committed to form a system of protected areas in conformity with modern conservation concepts, encompassing terrestrial and wetland ecosystems. After the termination of the Nature Conservation and National Parks Project (1981-84) which was assisted by FAO and financed jointly by UNDP and the government, its functions were taken over by the newly formed Wildlife and Sanctuaries Division of the Forest Department

  6. Protected areas and wildlife management in Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    Lwin, Thein [Forest Department (Myanmar)

    1993-10-01

    Myanmar embraces diverse geophysical features from the sea in the south to the snow-capped mountains in the north. Wildlife conservation is not new to Myanmar and it dated back to about 1859, the period of the last dynasty of Myanmar Kings. Myanmar is strongly committed to form a system of protected areas in conformity with modern conservation concepts, encompassing terrestrial and wetland ecosystems. After the termination of the Nature Conservation and National Parks Project (1981-84) which was assisted by FAO and financed jointly by UNDP and the government, its functions were taken over by the newly formed Wildlife and Sanctuaries Division of the Forest Department

  7. The Comic Book Project

    Science.gov (United States)

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  8. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  9. A transportation-scheduling system for managing silvicultural projects

    Science.gov (United States)

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  10. 200 Area Deactivation Project Facilities Authorization Envelope Document

    International Nuclear Information System (INIS)

    DODD, E.N.

    2000-01-01

    Project facilities as required by HNF-PRO-2701, Authorization Envelope and Authorization Agreement. The Authorization Agreements (AA's) do not identify the specific set of environmental safety and health requirements that are applicable to the facility. Therefore, the facility Authorization Envelopes are defined here to identify the applicable requirements. This document identifies the authorization envelopes for the 200 Area Deactivation

  11. Termites of the Savanna ecosystem project study area, Nylsvley

    CSIR Research Space (South Africa)

    Ferrar, P

    1982-09-01

    Full Text Available This report describes the termite fauna of the Savanna Ecosystem Project study area at the Nylsvley Nature Reserve, with an illustrated key for identification of species. Twenty-one species of fifteen genera and two families are recorded, and notes...

  12. Four-dimensional Hooke's law can encompass linear elasticity and inertia

    International Nuclear Information System (INIS)

    Antoci, S.; Mihich, L.

    1999-01-01

    The question is examined whether the formally straightforward extension of Hooke's time-honoured stress-strain relation to the four dimensions of special and of general relativity can make physical sense. The four-dimensional Hooke law is found able to account for the inertia of matter; in the flat-space, slow-motion approximation the field equations for the displacement four-vector field ξ i can encompass both linear elasticity and inertia. In this limit one just recovers the equations of motion of the classical theory of elasticity

  13. Position paper: Live load design criteria for Project W-236A Multi-Function Waste Tank Facility

    International Nuclear Information System (INIS)

    Giller, R.A.

    1995-01-01

    The purpose of this paper is to discuss the live loads applied to the underground storage tanks of the Multi Function Waste Tank Facility, and to provide the basis for Project W-236A live load criteria. Project 236A provides encompasses building a Weather Enclosure over the two underground storage tanks at the 200-West area. According to the Material Handling Study, the Groves AT 1100 crane used within the Weather Enclosure will have a gross vehicle weight of 66.5 tons. Therefore, a 100-ton concentrated live load is being used for the planning of the construction of the Weather Enclosure

  14. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael G.

    2016-01-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  15. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael G. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  16. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  17. Project evaluation for energy supply in rural areas of developing countries

    DEFF Research Database (Denmark)

    Vidal, Rene Victor Valqui; Christensen, J. M.

    1990-01-01

    This paper reports the methodological experiences of the project: Energy Supply Technologies in Developing Countries, carried out in collaboration with the Department of Energy, Zambia. Existing methods for project evaluation, based on cost-benefit analysis, will be briefly presented, particularly...... as regards their inadequacy for assessing energy projects in rural areas.An alternative practical and PC-based approach will be presented in which emphasis is placed on the problem formulation phase, including the socio-economic, cultural and political aspects of the problem. This approach has been prepared...

  18. Port Hope and area property value protection program: creating stability in the marketplace

    International Nuclear Information System (INIS)

    Zelmer, R.

    2003-01-01

    The Property Value Protection (PVP) Program offers an innovative approach to address the risk of individual property value loss resulting from the cleanup and long-term management of low level radioactive waste in the Port Hope area. In its first year of operation, the program has created stability in the marketplace and provided the communities' property owners with the assurance that their investment in their homes and properties will be protected. The PVP Program is part of the Port Hope Area Initiative (the Initiative), encompassing the Port Hope Project for the cleanup of low-level radioactive waste and the development of two long term, low-level radioactive waste management facilities in the Municipality of Port Hope, Ontario. Canada, and the Port Granby Project involving the development of along-term, low-level radioactive waste management facility near Port Granby in the neighbouring Municipality of Clarington. Ontario, Canada. (author)

  19. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  20. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  1. A LOCAL DEVELOPMENT PROJECT IN THE FRAMEWORK OF PUBLIC POLICIES FOCUSED ON REGIONAL DEVELOPMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    George Schin

    2013-12-01

    Full Text Available This paper aims at outlining a successful implementation of a project within LEADER framework, which is a local development method which allows local actors to develop an area by using its endogenous development potential. After a brief presentation of the characteristics of regional development strategies in Romania, there were emphasized the objectives and activities encompassed in a local development plan, managed by the leaders of the local action group called ‘Vrancea County’. In order to reinforce the strengths of Vrancea County and implicitly to assure a sustainable development of this area from the South-East part of Romania, a LAG constituted through a partnership between public and private actors settled a set of priorities to be exploited by means of specific actions. The goal of this paper is to highlight these priorities, by integrating them in a project management approach. The paper concludes with specifications about how Microsoft Project software could support project management initiatives that will be developed by the LAG Vrancea County in the next period.

  2. Nuclear power programmes and medium term projections in the OECD area

    International Nuclear Information System (INIS)

    Miida, J.; Haeussermann, W.; Mankin, S.

    1977-01-01

    The paper describes nuclear power growth forecasts up to 1985 on an individual country basis for the OECD area, based on present nuclear programmes. For the period between 1985 and the year 2000, no individual countries' estimates are given. The projections for this period are subdivided into three main areas: OECD Europe, North America and OECD Pacific Region. These projections are derived from the presently prevailing estimates concerning total energy growth, the increasing share of electricity requirements in total energy requirements and the growth of the nuclear share in electrical installed capacity. The basic assumptions are discussed and the combination of various possibilities results in upper and lower growth limits, which should include the most likely development. An attempt is also made to describe probable scenarios of nuclear reactor strategies, taking into account developments under way in the OECD area. Finally, the factors liable to influence nuclear power growth in a positive or negative way are briefly analysed

  3. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  4. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits, Area 5 Waste Management Division, Nevada National Security Site, Final CQA Report

    International Nuclear Information System (INIS)

    2012-01-01

    The report is the Final Construction Quality Assurance (CQA) Report for the 92-Acrew Evapotranspiration Cover, Area 5 Waste Management Division Retired Mixed Waste Pits, Nevada National Security Site, Nevada, for the period of January 20, 2011, to January 31, 2012 The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.

  5. Conceptual design report, 200 Area sanitary sewer system: Project 96L-EWL-116

    International Nuclear Information System (INIS)

    Pursley, D.L.

    1994-01-01

    Project L-116 will install an integrated sanitary sewer system in the 200 Area. This new system will connect existing sewer systems for facilities that have a foreseeable future, provide capacity and routing for future facilities, and install new septic sewer systems for existing facilities that cannot be feasibly connected to the new sewer system and have a mission that will extend beyond the year 2000. Project L-116 will construct a sanitary sewer collection, treatment, and disposal system for facilities in the 200-East and -West Areas and adjacent areas located on the 200 Area plateau. The existing septic systems will be abandoned or decommissioned in accordance with applicable Washington State and local codes and regulations. The conceptual design for the sanitary sewer system is designed around population forecasts of 5,000 people for 200-West Area and 9,000 people for 200-East Area. The definitive design will be based on the latest forecast populations at the time definitive design is initiated

  6. 75 FR 27808 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Science.gov (United States)

    2010-05-18

    ... Voucher Program--Demonstration Project of Small Area Fair Market Rents in Certain Metropolitan Areas for.... ACTION: Notice of Demonstration Project of Small Area Fair Market Rents (FMRs) in Selected Metropolitan... topics related to small area FMRs, including how these small areas should be defined. Small area FMRs...

  7. From Balancing the Numbers to an Encompassing Business Case

    DEFF Research Database (Denmark)

    Labucay, Inéz

    2013-01-01

    and Horwitz 2007). The focus of the paper is on further developing and building on theoretical concepts of diversity. It also establishes links to non-mainstream theories like social network theory. After a short introduction to the model, the three stages of the model (Diversity concept, Diversity goals......, Diversity measurement) are presented in more detail, followed by a summary and conclusion on its applicability and relevance for diversity practitioners. An outlook on further research ensues. The paper aims at delineating an approach to building a more encompassing Business Case.......The Business Case of Diversity Management has evolved as the predominant concept underlying many diversity studies and practices in the field. In this line of reasoning, corporate bottom line results like an increased return on investment (ROI) are partially explained by the existence of Diversity...

  8. Project for environmental recovery of the Taquari stream in the surroundings of OSBRA Pipeline; Projeto de recuperacao ambiental do corrego Taquari no entorno do duto OSBRA

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Carlos A.R.; Maia, Jacob S; Magalhaes, Milton P; Nunes, Roberta V [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Camargo, Renato F [R. Camargo Ambiental, Americana, SP (Brazil); Ruas, Tereza C.B.G. [Secretaria de Agricultura e Abastecimento, Sao Paulo, SP (Brazil). Coordenadoria de Assistencia Tecnica Integral (CATI)

    2008-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO the Project of Environmental Recovery of Taquari Stream (which runs close to Osbra pipeline) to the end of reducing the effect of flooding of the areas adjoining the water body. The discussion encompasses the following themes: pipeline interference with water bodies during construction; relationship with stakeholders; impact of agricultural activities on water bodies; conflicts upon establishment of legal reserves and protection of Permanent Preservation Areas. (author)

  9. Neurochemical, morphologic, and laminar characterization of cortical projection neurons in the cingulate motor areas of the macaque monkey

    Science.gov (United States)

    Nimchinsky, E. A.; Hof, P. R.; Young, W. G.; Morrison, J. H.; Bloom, F. E. (Principal Investigator)

    1996-01-01

    The primate cingulate gyrus contains multiple cortical areas that can be distinguished by several neurochemical features, including the distribution of neurofilament protein-enriched pyramidal neurons. In addition, connectivity and functional properties indicate that there are multiple motor areas in the cortex lining the cingulate sulcus. These motor areas were targeted for analysis of potential interactions among regional specialization, connectivity, and cellular characteristics such as neurochemical profile and morphology. Specifically, intracortical injections of retrogradely transported dyes and intracellular injection were combined with immunocytochemistry to investigate neurons projecting from the cingulate motor areas to the putative forelimb region of the primary motor cortex, area M1. Two separate groups of neurons projecting to area M1 emanated from the cingulate sulcus, one anterior and one posterior, both of which furnished commissural and ipsilateral connections with area M1. The primary difference between the two populations was laminar origin, with the anterior projection originating largely in deep layers, and the posterior projection taking origin equally in superficial and deep layers. With regard to cellular morphology, the anterior projection exhibited more morphologic diversity than the posterior projection. Commissural projections from both anterior and posterior fields originated largely in layer VI. Neurofilament protein distribution was a reliable tool for localizing the two projections and for discriminating between them. Comparable proportions of the two sets of projection neurons contained neurofilament protein, although the density and distribution of the total population of neurofilament protein-enriched neurons was very different in the two subareas of origin. Within a projection, the participating neurons exhibited a high degree of morphologic heterogeneity, and no correlation was observed between somatodendritic morphology and

  10. Regional groundwater flow model for C, K. L. and P reactor areas, Savannah River Site, Aiken, SC

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G.P.

    2000-02-11

    A regional groundwater flow model encompassing approximately 100 mi2 surrounding the C, K, L, and P reactor areas has been developed. The reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department. The model provides a quantitative understanding of groundwater flow on a regional scale within the near surface aquifers and deeper semi-confined to confined aquifers. The model incorporates historical and current field characterization data up through Spring 1999. Model preprocessing is automated so that future updates and modifications can be performed quickly and efficiently. The CKLP regional reactor model can be used to guide characterization, perform scoping analyses of contaminant transport, and serve as a common base for subsequent finer-scale transport and remedial/feasibility models for each reactor area.

  11. Regional groundwater flow model for C, K. L. and P reactor areas, Savannah River Site, Aiken, SC

    International Nuclear Information System (INIS)

    Flach, G.P.

    2000-01-01

    A regional groundwater flow model encompassing approximately 100 mi2 surrounding the C, K, L, and P reactor areas has been developed. The reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department. The model provides a quantitative understanding of groundwater flow on a regional scale within the near surface aquifers and deeper semi-confined to confined aquifers. The model incorporates historical and current field characterization data up through Spring 1999. Model preprocessing is automated so that future updates and modifications can be performed quickly and efficiently. The CKLP regional reactor model can be used to guide characterization, perform scoping analyses of contaminant transport, and serve as a common base for subsequent finer-scale transport and remedial/feasibility models for each reactor area

  12. Sediment Properties: E-Area Completion Project

    Energy Technology Data Exchange (ETDEWEB)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site

  13. MANPOWER PROJECTIONS AND TRAINING NEEDS FORECAST TO 1975 FOR THE TERRE HAUTE AREA.

    Science.gov (United States)

    Indiana State Univ., Terre Haute.

    USING U.S. CENSUS BUREAU AND INDIANA EMPLOYMENT SECURITY DIVISION DATA, A PREVIOUS STUDY WAS UPDATED TO INCLUDE PROJECTIONS OF MANPOWER AND TRAINING NEEDS FOR THE TERRE HAUTE AREA. GRAPHS SHOW TRENDS FOR EIGHT OCCUPATIONAL GROUPS IN THE UNITED STATES, THE NATION'S URBAN AREAS, INDIANA, AND THE TERRE HAUTE STANDARD METROPOLITAN AREA. MANPOWER NEEDS…

  14. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  15. Environmental impacts of Ghazi Barotha hydropower project on river Indus and surrounding areas

    International Nuclear Information System (INIS)

    Soomro, G.A.; Sufi, A.B.

    2005-01-01

    WAPDA being an esteemed organization of the country is involved in development of Water and Power Sector Projects. Ghazi Barotha Hydropower Project is another huge hydropower generation project in the country after Tarbela. The barrage to feed power channel of Ghazi Barotha Power Station are built over River Indus 7 Km down of Tarbela Dam. The project has been constructed to utilize the hydraulic head for power generation that is available between the tailrace of Tarbela Dam and the confluence of Haro River. In this reach river Indus drops by 76 m in distance of 63 Km. This is solely a power generation project with an installed capacity of 1450 MW. The purpose of this paper is to assess the negative impacts on the River Indus due to the construction of GBHP as Water of river Indus will be diverted to the power channel and the river Indus flows go to its lowest in low flow season. The reduction in river flow may change the ecology of the river - belas and people dependant on river water. In this context a study was made to keep the negative environmental impacts as low as possible and suggest mitigation measures to reduce negative impacts and provide enhancement measure to compensate the losses to be sustained by the area people and maintain the social life along with the ecology of the area less disturbed. The study demonstrated that the project is technically sound, economically viable and has limited environmental and social impacts on the area overall and specific the belas and people dependant on the Indus Water from Tarbela downstream up to confluence of Kabul River. (author)

  16. Feedforward and feedback projections of caudal belt and parabelt areas of auditory cortex: refining the hierarchical model

    Directory of Open Access Journals (Sweden)

    Troy A Hackett

    2014-04-01

    Full Text Available Our working model of the primate auditory cortex recognizes three major regions (core, belt, parabelt, subdivided into thirteen areas. The connections between areas are topographically ordered in a manner consistent with information flow along two major anatomical axes: core-belt-parabelt and caudal-rostral. Remarkably, most of the connections supporting this model were revealed using retrograde tracing techniques. Little is known about laminar circuitry, as anterograde tracing of axon terminations has rarely been used. The purpose of the present study was to examine the laminar projections of three areas of auditory cortex, pursuant to analysis of all areas. The selected areas were: middle lateral belt (ML; caudomedial belt (CM; and caudal parabelt (CPB. Injections of anterograde tracers yielded data consistent with major features of our model, and also new findings that compel modifications. Results supporting the model were: 1 feedforward projection from ML and CM terminated in CPB; 2 feedforward projections from ML and CPB terminated in rostral areas of the belt and parabelt; and 3 feedback projections typified inputs to the core region from belt and parabelt. At odds with the model was the convergence of feedforward inputs into rostral medial belt from ML and CPB. This was unexpected since CPB is at a higher stage of the processing hierarchy, with mainly feedback projections to all other belt areas. Lastly, extending the model, feedforward projections from CM, ML, and CPB overlapped in the temporal parietal occipital area (TPO in the superior temporal sulcus, indicating significant auditory influence on sensory processing in this region. The combined results refine our working model and highlight the need to complete studies of the laminar inputs to all areas of auditory cortex. Their documentation is essential for developing informed hypotheses about the neurophysiological influences of inputs to each layer and area.

  17. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  18. Advanced Large Area Plastic Scintillator Project (ALPS): Final Report

    International Nuclear Information System (INIS)

    Jordan, David V.; Reeder, Paul L.; Todd, Lindsay C.; Warren, Glen A.; McCormick, Kathleen R.; Stephens, Daniel L.; Geelhood, Bruce D.; Alzheimer, James M.; Crowell, Shannon L.; Sliger, William A.

    2008-01-01

    The advanced Large-Area Plastic Scintillator (ALPS) Project at Pacific Northwest National Laboratory investigated possible technological avenues for substantially advancing the state-of-the-art in gamma-ray detection via large-area plastic scintillators. The three predominant themes of these investigations comprised the following: * Maximizing light collection efficiency from a single large-area sheet of plastic scintillator, and optimizing hardware event trigger definition to retain detection efficiency while exploiting the power of coincidence to suppress single-PMT 'dark current' background; * Utilizing anti-Compton vetoing and supplementary spectral information from a co-located secondary, or 'Back' detector, to both (1) minimize Compton background in the low-energy portion of the 'Front' scintillator's pulse-height spectrum, and (2) sharpen the statistical accuracy of the front detector's low-energy response prediction as implemented in suitable energy-windowing algorithms; and * Investigating alternative materials to enhance the intrinsic gamma-ray detection efficiency of plastic-based sensors

  19. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  20. Advanced fusion concepts project summaries, FY 1988

    International Nuclear Information System (INIS)

    1988-04-01

    This report summarizes all the projects supported by the Advanced Fusion Concepts Branch of the Applied Plasma Physics Division of the Office of Fusion Energy, US Department of Energy. Each project summary was written by the respective principal investigator using the format: title, principal investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications. This report is organized into three sections: Section one contains five summaries describing work in the reversed-field pinch program being performed by a diversified group of contractors, these include a national laboratory, a private company, and several universities. Section two contains eight summaries of work from the compact toroid area which encompasses field-reversed configurations, spheromaks, and heating and formation experiments. Section three contains summaries from two other programs, a density Z-pinch experiment and high-beta Q machine experiment. The intent of this collection of project summaries is to help the contractors of the Advanced Fusion Concepts Branch understand their relationship with the rest of the branch's activities. It is also meant to provide background to those outside the program by showing the range of activities of interest of the Advanced Fusion Concepts Branch

  1. Life Cycle Management for an Investment Project in Cluj-Salaj Area, Romania

    Directory of Open Access Journals (Sweden)

    Vasile Iuliu CIOMOŞ

    2011-02-01

    Full Text Available The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives. Regardless of scope or complexity, any project goes through a series of stages during its life. Authors’ experience in preparing and implementing investment projects in the water sector has led to several conclusions: there is first an identification phase, in which the outputs and critical success factors are defined, followed by a planning phase, characterized by breaking down the project into smaller tasks, an execution phase, in which the project plan is executed, and lastly a completion phase, that marks the closure and exit of the project. Investment project activities must be grouped into phases because by doing so, the project management and the core team can efficiently plan and organize resources for each activity, and also objectively measure achievement of the goals. This paper introduces several issues related to the Project Cycle Management for a large local infrastructure investment project in the Cluj- Sălaj area, Romania. Successfully managing the project cycle and making timely decisions at every stage (identification, planning, execution and sustainability require the Project Management Unit from the Cluj-Sălaj Water Company to constantly understand and adapt to strategic considerations, both external and internal.

  2. Communicating Astronomy in a Metropolis and Disaster Area - Activities of the Tenpla Project

    Science.gov (United States)

    Kamegai, K.; Takanashi, N.; Hiramatsu, M.; Naito, S.

    2015-03-01

    We present recent activities delivering astronomy to the public by the Tenpla project in Japan. One is voluntary activities in the disaster area of the Great East Japan Earthquake. The other is holding tens of star parties and public lectures in the central area of Tokyo.

  3. Energy secretary's priorities include San Francisco area research projects

    CERN Multimedia

    Widener, A

    2003-01-01

    "Bay Area research labs got a big boost Monday when the Secretary of Energy unveiled his priorities for major research projects his agency hopes to fund over the next two decades. Among the agency's 28 top priorities are a major computer expansion and an experiment examining the expanding universe that could be housed at Lawrence Berkeley Lab and a powerful X-ray laser planned for the Stanford Linear Accelerator Center" (1 page).

  4. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report

  5. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  6. Advanced Large Area Plastic Scintillator Project (ALPS): Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, David V.; Reeder, Paul L.; Todd, Lindsay C.; Warren, Glen A.; McCormick, Kathleen R.; Stephens, Daniel L.; Geelhood, Bruce D.; Alzheimer, James M.; Crowell, Shannon L.; Sliger, William A.

    2008-02-05

    The advanced Large-Area Plastic Scintillator (ALPS) Project at Pacific Northwest National Laboratory investigated possible technological avenues for substantially advancing the state-of-the-art in gamma-ray detection via large-area plastic scintillators. The three predominant themes of these investigations comprised the following: * Maximizing light collection efficiency from a single large-area sheet of plastic scintillator, and optimizing hardware event trigger definition to retain detection efficiency while exploiting the power of coincidence to suppress single-PMT "dark current" background; * Utilizing anti-Compton vetoing and supplementary spectral information from a co-located secondary, or "Back" detector, to both (1) minimize Compton background in the low-energy portion of the "Front" scintillator's pulse-height spectrum, and (2) sharpen the statistical accuracy of the front detector's low-energy response prediction as impelmented in suitable energy-windowing algorithms; and * Investigating alternative materials to enhance the intrinsic gamma-ray detection efficiency of plastic-based sensors.

  7. Cancellation of a wind farm project in an area covered by the Mountain law

    International Nuclear Information System (INIS)

    Roux, Gilles

    2017-01-01

    In April 2017 the court of appeal of Marseille (South-East France) had to deal with the cancellation request of a prefectorial order authorizing the building of 9 wind turbines. The court, after appraisal of the quality of the area in concern and of the landscape impacts this project should generate, considered that the project would effectively strongly impact the natural areas and thus has ordered the cancellation of the prefectorial order. This paper presents the explanatory statement and the conclusions of the judgement

  8. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    International Nuclear Information System (INIS)

    Veselka, T.D.; Hamilton, S.; McCoy, J.

    1995-01-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  9. 2007 Florida Division of Emergency Management (FDEM) Lidar: Herbert Hoover Dike Project Area (Southeastern Florida, Lake Okeechobee Surrounding Area)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — LiDAR data was collected by Merrick & Company from September through December of 2007 for the Florida Division of Emergency Management (FDEM). The project area...

  10. MODELS OF AND APPROACHES TO MANAGEMENT OF REAL ESTATE DEVELOPMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2012-12-01

    Full Text Available The authors argue that globalization and the system-wide crisis jointly produce a strong impact onto real estate (RE development projects. As a result, intensive alterations in RE project development patterns have converted into a new trend of the present-day investment and construction industry. Therefore, alterations in the area of real estate management cause numerous problems. By virtue of this article, the authors make an attempt to provide their answer to the question whether it is possible to achieve such a sophisticated level of project management in the real estate development industry, so that project-related decisions encompassed supplementary potential opportunities in terms of social, economic and public development. Towards this end, the new concept of real estate development is proposed and the system of priorities has been developed. This concept is believed to enable all players of the construction market to make higher quality decisions at early stages of RE development projects. Besides, a lot of attention is driven to the term "potential of a construction facility", that is regarded as a set of yet unimplemented opportunities for improvements of the construction facility performance as a commercial and social vehicle.

  11. Ethical Review of Undergraduate Student Research Projects: A Proportionate, Transparent and Efficient Process?

    Science.gov (United States)

    Hack, Catherine J.

    2012-01-01

    Undergraduate research projects in the life sciences encompass a broad range of studies, some of which may require the participation of human subjects or other activities which may raise ethical concerns. As universities are accountable for all projects undertaken under their auspices they must ensure that these projects adhere to legal…

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  13. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development com...

  14. Ipsilateral corticotectal projections from the primary, premotor and supplementary motor cortical areas in adult macaque monkeys: a quantitative anterograde tracing study

    Science.gov (United States)

    Fregosi, Michela; Rouiller, Eric M.

    2018-01-01

    The corticotectal projection from cortical motor areas is one of several descending pathways involved in the indirect control of spinal motoneurons. In non-human primates, previous studies reported that cortical projections to the superior colliculus originated from the premotor cortex and the primary motor cortex, whereas no projection originated from the supplementary motor area. The aim of the present study was to investigate and compare the properties of corticotectal projections originating from these three cortical motor areas in intact adult macaques (n=9). The anterograde tracer BDA was injected into one of these cortical areas in each animal. Individual axonal boutons, both en passant and terminaux, were charted and counted in the different layers of the ipsilateral superior colliculus. The data confirmed the presence of strong corticotectal projections from the premotor cortex. A new observation was that strong corticotectal projections were also found to originate from the supplementary motor area (its proper division). The corticotectal projection from the primary motor cortex was quantitatively less strong than that from either the premotor or supplementary motor areas. The corticotectal projection from each motor area was directed mainly to the deep layer of the superior colliculus, although its intermediate layer was also a consistent target of fairly dense terminations. The strong corticotectal projections from non-primary motor areas are in position to influence the preparation and planning of voluntary movements. PMID:28921678

  15. Area recommendation report for the crystalline repository project: An evaluation

    International Nuclear Information System (INIS)

    Beck, J.E.; Lowe, H.; Yurkovich, S.P.

    1986-01-01

    An evaluation is given of DOE's recommendation of the Elk River complex in North Carolina for siting the second repository. Twelve recommendations are made including a strong suggestion that the Cherokee Tribe appeal both through political and legal avenues for inclusion as an affected area primarily due to projected impacts upon economy and public health as a consequence of the potential for reduced tourism

  16. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  17. Status of parasitism in donkeys of project and control areas in ...

    African Journals Online (AJOL)

    The study was undertaken with the aim of comparing the status of parasitism in donkeys in the Donkey Health and welfare Project intervention (Bereh, Ada and Boset) and Control (Yekaduda, Gerado and Meki) areas of, Central Ethiopia, in 2005. Parasites are prime problem of donkeys among other problems including ...

  18. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    Connor, M.D.

    1994-01-01

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover

  19. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  20. Critical review of the draft Area Recommendation Report and region-to-area screening methodology for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1986-01-01

    Two documents related to the Crystalline Repository Project have been reviewed. Comments and concerns related to the review of the ''Region-To-Area Screening Methodology'' and the ''Draft Area Recommendation Report'' are presented. These comments will be considered in preparation of the Final Area Recommendation Report, which will serve to formally identify potentially acceptable sites for a second repository in crystalline rock. Following a detailed review of the aforementioned documents, it is concluded that the identification of proposed potentially acceptable sites in the Draft Area Recommendation Report is based on questionable screening methodology and often incomplete data. As a result, ''favorable characteristics'' that are ascribed to each of the proposed potentially acceptable sites are, in many cases, misleading

  1. St. Louis Area Earthquake Hazards Mapping Project - A Progress Report-November 2008

    Science.gov (United States)

    Karadeniz, D.; Rogers, J.D.; Williams, R.A.; Cramer, C.H.; Bauer, R.A.; Hoffman, D.; Chung, J.; Hempen, G.L.; Steckel, P.H.; Boyd, O.L.; Watkins, C.M.; McCallister, N.S.; Schweig, E.

    2009-01-01

    St. Louis has experienced minor earthquake damage at least 12 times in the past 200 years. Because of this history and its proximity to known active earthquake zones, the St. Louis Area Earthquake Hazards Mapping Project (SLAEHMP) is producing digital maps that show variability of earthquake hazards, including liquefaction and ground shaking, in the St. Louis area. The maps will be available free via the internet. Although not site specific enough to indicate the hazard at a house-by-house resolution, they can be customized by the user to show specific areas of interest, such as neighborhoods or transportation routes. Earthquakes currently cannot be predicted, but scientists can estimate how strongly the ground is likely to shake as the result of an earthquake. Earthquake hazard maps provide one way of conveying such estimates. The U.S. Geological Survey (USGS), which produces earthquake hazard maps for the Nation, is working with local partners to develop detailed maps for urban areas vulnerable to strong ground shaking. These partners, which along with the USGS comprise the SLAEHMP, include the Missouri University of Science and Technology-Rolla (Missouri S&T), Missouri Department of Natural Resources (MDNR), Illinois State Geological Survey (ISGS), Saint Louis University, Missouri State Emergency Management Agency, and URS Corporation. Preliminary hazard maps covering a test portion of the 29-quadrangle St. Louis study area have been produced and are currently being evaluated by the SLAEHMP. A USGS Fact Sheet summarizing this project was produced and almost 1000 copies have been distributed at several public outreach meetings and field trips that have featured the SLAEHMP (Williams and others, 2007). In addition, a USGS website focusing on the SLAEHMP, which provides links to project results and relevant earthquake hazard information, can be found at: http://earthquake.usgs.gov/regional/ceus/urban_map/st_louis/index.php. This progress report summarizes the

  2. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  3. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  4. D-Area Drip Irrigation/Phytoremediation Project: SRTC Report on Phase 1

    International Nuclear Information System (INIS)

    Wilde, E.W.

    2001-01-01

    The overall objective of this project is to evaluate a novel drip irrigation-phytoremediation process for remediating volatile organic contaminants (VOCs), primarily trichloroethylene (TCE), from groundwater in D-Area at the Savannah River Site (SRS). The process is expected to be less expensive and more beneficial to the environment than alternative TCE remediation technologies

  5. Carbon Storage in Urban Areas in the USA

    Science.gov (United States)

    Churkina, G.; Brown, D.; Keoleian, G.

    2007-12-01

    It is widely accepted that human settlements occupy a small proportion of the landmass and therefore play a relatively small role in the dynamics of the global carbon cycle. Most modeling studies focusing on the land carbon cycle use models of varying complexity to estimate carbon fluxes through forests, grasses, and croplands, but completely omit urban areas from their scope. Here, we estimate carbon storage in urban areas within the United States, defined to encompass a range of observed settlement densities, and its changes from 1950 to 2000. We show that this storage is not negligible and has been continuously increasing. We include natural- and human-related components of urban areas in our estimates. The natural component includes carbon storage in urban soil and vegetation. The human related component encompasses carbon stored long term in buildings, furniture, cars, and waste. The study suggests that urban areas should receive continued attention in efforts to accurately account for carbon uptake and storage in terrestrial systems.

  6. Magnetotelluric investigation of the Toender area, Denmark. ALTKUL project report part 2

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, T.M.; Thorning, L. [GEUS, Copenhagen (Denmark); Pedersen, L.B.; Shan, C. [Uppsala Univ., Dept. of Earth Sciences, Uppsala (Sweden)

    2012-10-15

    Project ALTKUL was commissioned by DONG E and P A/S and Nordsoefonden; the Danish Energy Agency followed the project closely. The first part of the study has been reported in Rasmussen and Thorning (2012).The starting point of the study was a need for more knowledge on methods that could be used for hydrocarbon exploration in Danish onshore areas, as an alternative to seismic investigations, when these cannot be used for nature protecting reasons. DONG E and P A/S and Nordsoefonden approached GEUS, suggesting a study of seven different non-seismic methods. The Danish Energy Agency was interested in the subject and requested that an actual test of a method be carried out as a part of the project. The optimum choice for a field test was an electromagnetic experiment with a galvanic controlled source (Rasmussen and Thorning, 2012). However, due to organisational issues and a limited timeframe of the project, the final choice of method for the field test was settled on using the magnetotelluric method (MT). Though MT does not utilise galvanic controlled sources, and hence does not serve as a tool for direct hydrocarbon exploration, MT has been used in the past in relation with hydrocarbon exploration onshore and has recently gained considerable interest in China. A contract was entered with Uppsala University for some initial tests of the magnetotelluric (MT) method. The test was carried out August 2012 in an area around Toender, and is reported here as ALTKUL Project Report Part 2. In total 42 MT stations were measured in a 180 km{sup 2} area. The digital data are enclosed with the report and hereby released to the public. A 3D model of the electrical resistivity variations to a depth of 6 km constitutes, together with the actual measured data, the main results of part 2 of the ALTKUL project. The 3D model was derived from an unconstrained 3D inversion of the MT data. The MT data show that pronounced lateral resistivity variations exist at the depth of interest for

  7. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  8. Mine and prospect map of the Vermilion Cliffs-Paria Canyon Instant Study Area and adjacent wilderness areas, Coconino County, Arizona, and Kane County, Utah

    Science.gov (United States)

    Lane, Michael

    1983-01-01

    Vermilion Cliffs-Paria Canyon Instant Study Area and adjacent wilderness areas are mostly in Coconino County Ariz., but extend into Kane County, Utah. The area studied in this report encompasses about 560 mi2 (1,450 km2). The study area includes the established Paria Canyon Primitive and Vermilion Cliffs Natural Areas between U.S. Highways 89 and 89A.

  9. The Maui's Dolphin Challenge: Lessons from a School-Based Litter Reduction Project

    Science.gov (United States)

    Townrow, Carly S.; Laurence, Nick; Blythe, Charlotte; Long, Jenny; Harré, Niki

    2016-01-01

    The Maui's Dolphin Challenge was a litter reduction project that was run twice at a secondary school in Aotearoa New Zealand. The project drew on a theoretical framework encompassing four psycho-social principles: values, embodied learning, efficacy, and perceived social norms. It challenged students to reduce the litter at the school by offering…

  10. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  11. A Study on Evaluation of the Biology Projects Submitted to the TUBITAK Secondary Education Research Projects Contest from the Bursa Region

    Science.gov (United States)

    Zeren Özer, Dilek; Güngör, Sema Nur; Özkan, Muhlis

    2015-01-01

    This study evaluates, through the employment of scientific methods and techniques, a total of 107 Biology projects submitted by secondary education students to the Bursa Region Coordinatorship of TUBITAK (a region which encompasses the municipalities of Afyonkarahisar, Balikesir, Bilecik, Canakkale, Eskisehir, Kutahya, and Yalova). The projects…

  12. Region-to-area screening methodology for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1985-04-01

    The purpose of this document is to describe the Crystalline Repository Project's (CRP) process for region-to-area screening of exposed and near-surface crystalline rock bodies in the three regions of the conterminous United States where crystalline rock is being evaluated as a potential host for the second nuclear waste repository (i.e., in the North Central, Northeastern, and Southeastern Regions). This document indicates how the US Department of Energy's (DOE) General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories (10 CFR 960) were used to select and apply factors and variables for the region-to-area screening, explains how these factors and variable are to be applied in the region-to-area screening, and indicates how this methodology relates to the decision process leading to the selection of candidate areas. A brief general discussion of the screening process from the national survey through area screening and site recommendation is presented. This discussion sets the scene for detailed discussions which follow concerning the region-to-area screening process, the guidance provided by the DOE Siting Guidelines for establishing disqualifying factors and variables for screening, and application of the disqualifying factors and variables in the screening process. This document is complementary to the regional geologic and environmental characterization reports to be issued in the summer of 1985 as final documents. These reports will contain the geologic and environmental data base that will be used in conjunction with the methodology to conduct region-to-area screening

  13. Large rainfall changes consistently projected over substantial areas of tropical land

    Science.gov (United States)

    Chadwick, Robin; Good, Peter; Martin, Gill; Rowell, David P.

    2016-02-01

    Many tropical countries are exceptionally vulnerable to changes in rainfall patterns, with floods or droughts often severely affecting human life and health, food and water supplies, ecosystems and infrastructure. There is widespread disagreement among climate model projections of how and where rainfall will change over tropical land at the regional scales relevant to impacts, with different models predicting the position of current tropical wet and dry regions to shift in different ways. Here we show that despite uncertainty in the location of future rainfall shifts, climate models consistently project that large rainfall changes will occur for a considerable proportion of tropical land over the twenty-first century. The area of semi-arid land affected by large changes under a higher emissions scenario is likely to be greater than during even the most extreme regional wet or dry periods of the twentieth century, such as the Sahel drought of the late 1960s to 1990s. Substantial changes are projected to occur by mid-century--earlier than previously expected--and to intensify in line with global temperature rise. Therefore, current climate projections contain quantitative, decision-relevant information on future regional rainfall changes, particularly with regard to climate change mitigation policy.

  14. Ellipsoidal terrain correction based on multi-cylindrical equal-area map projection of the reference ellipsoid

    Science.gov (United States)

    Ardalan, A. A.; Safari, A.

    2004-09-01

    An operational algorithm for computation of terrain correction (or local gravity field modeling) based on application of closed-form solution of the Newton integral in terms of Cartesian coordinates in multi-cylindrical equal-area map projection of the reference ellipsoid is presented. Multi-cylindrical equal-area map projection of the reference ellipsoid has been derived and is described in detail for the first time. Ellipsoidal mass elements with various sizes on the surface of the reference ellipsoid are selected and the gravitational potential and vector of gravitational intensity (i.e. gravitational acceleration) of the mass elements are computed via numerical solution of the Newton integral in terms of geodetic coordinates {λ,ϕ,h}. Four base- edge points of the ellipsoidal mass elements are transformed into a multi-cylindrical equal-area map projection surface to build Cartesian mass elements by associating the height of the corresponding ellipsoidal mass elements to the transformed area elements. Using the closed-form solution of the Newton integral in terms of Cartesian coordinates, the gravitational potential and vector of gravitational intensity of the transformed Cartesian mass elements are computed and compared with those of the numerical solution of the Newton integral for the ellipsoidal mass elements in terms of geodetic coordinates. Numerical tests indicate that the difference between the two computations, i.e. numerical solution of the Newton integral for ellipsoidal mass elements in terms of geodetic coordinates and closed-form solution of the Newton integral in terms of Cartesian coordinates, in a multi-cylindrical equal-area map projection, is less than 1.6×10-8 m2/s2 for a mass element with a cross section area of 10×10 m and a height of 10,000 m. For a mass element with a cross section area of 1×1 km and a height of 10,000 m the difference is less than 1.5×10-4m2/s2. Since 1.5× 10-4 m2/s2 is equivalent to 1.5×10-5m in the vertical

  15. Climate projections in the Hornsund area, Southern Spitsbergen

    Directory of Open Access Journals (Sweden)

    Osuch Marzena

    2016-09-01

    Full Text Available The aim of this study was to provide an estimation of climate variability in the Hornsund area in Southern Spitsbergen in the period 1976-2100. The climatic variables were obtained from the Polar-CORDEX initiative in the form of time series of daily air temperature and precipitation derived from four global circulation models (GCMs following representative concentration pathways (RCP RCP 4.5 and RCP 8.5 emission scenarios. In the first stage of the analysis, simulations for the reference period from 1979 to 2005 were compared with observations at the Polish Polar Station Hornsund from the same period of time. In the second step, climatic projections were derived and monthly and annual means/sums were analysed as climatic indices. Following the standard methods of trend analysis, the changes of these indices over three time periods - the reference period 1976-2005, the near-future period 2021-2050, and far-future period 2071-2100 - were examined. The projections of air temperature were consistent. All analysed climate models simulated an increase of air temperature with time. Analyses of changes at a monthly scale indicated that the largest increases were estimated for winter months (more than 11°C for the far future using the RCP 8.5 scenario. The analyses of monthly and annual sums of precipitation also indicated increasing tendencies for changes with time, with the differences between mean monthly sums of precipitation for the near future and the reference period similar for each months. In the case of changes between far future and reference periods, the highest increases were projected for the winter months.

  16. Evaluation of functioning of ICDS project areas under Indore and Ujjain divisions of the state of Madhya Pradesh

    Directory of Open Access Journals (Sweden)

    Sanjay Dixit

    2010-07-01

    Full Text Available Background: Integrated Child Development Services (ICDS is recognized worldwide as one of the most efficient community based programmes promoting early childhood care. Regular evaluations of the programme have been conducted to make it more effective and adequate for the beneficiaries. Objectives: To evaluate the functioning of the Anganwadi Centers under different project areas of Indore and Ujjain Divisions. Methods: Under the present evaluation system one ICDS project and five Anganwadi Centers under the project area (AWCs were visited on a monthly basis and services provided reviewed. Findings reported are from nine project areas under Indore and Ujjain Divisions in the state of Madhya Pradesh from October 2008 – June 2009. Results: A total of 45 centers were evaluated. 29 centers were operating from rented buildings and storage facilities were lacking at 19 of the centers. Though the quality of food was acceptable to the beneficiaries shortage of food was a problem at the centers. Absence of Pre-School Education (PSE and Nutrition and Health Education (NHED Kits compromised PSE and NHED activities at the centers. Unavailability of medicine kits, lack of regular visits by the ANMs to the centers and absence of routine health check up of beneficiaries were other problems encountered under the project areas surveyed. Availability of a doctor under each project area was stated as a major need by the workers. Conclusion: Coordinated steps catering to different services provided at the centers are needed to optimize the functioning of the ICDS scheme.

  17. Global protected area expansion is compromised by projected land-use and parochialism.

    Science.gov (United States)

    Montesino Pouzols, Federico; Toivonen, Tuuli; Di Minin, Enrico; Kukkala, Aija S; Kullberg, Peter; Kuusterä, Johanna; Lehtomäki, Joona; Tenkanen, Henrikki; Verburg, Peter H; Moilanen, Atte

    2014-12-18

    Protected areas are one of the main tools for halting the continuing global biodiversity crisis caused by habitat loss, fragmentation and other anthropogenic pressures. According to the Aichi Biodiversity Target 11 adopted by the Convention on Biological Diversity, the protected area network should be expanded to at least 17% of the terrestrial world by 2020 (http://www.cbd.int/sp/targets). To maximize conservation outcomes, it is crucial to identify the best expansion areas. Here we show that there is a very high potential to increase protection of ecoregions and vertebrate species by expanding the protected area network, but also identify considerable risk of ineffective outcomes due to land-use change and uncoordinated actions between countries. We use distribution data for 24,757 terrestrial vertebrates assessed under the International Union for the Conservation of Nature (IUCN) 'red list of threatened species', and terrestrial ecoregions (827), modified by land-use models for the present and 2040, and introduce techniques for global and balanced spatial conservation prioritization. First, we show that with a coordinated global protected area network expansion to 17% of terrestrial land, average protection of species ranges and ecoregions could triple. Second, if projected land-use change by 2040 (ref. 11) takes place, it becomes infeasible to reach the currently possible protection levels, and over 1,000 threatened species would lose more than 50% of their present effective ranges worldwide. Third, we demonstrate a major efficiency gap between national and global conservation priorities. Strong evidence is shown that further biodiversity loss is unavoidable unless international action is quickly taken to balance land-use and biodiversity conservation. The approach used here can serve as a framework for repeatable and quantitative assessment of efficiency, gaps and expansion of the global protected area network globally, regionally and nationally, considering

  18. Flood Assessment Area 3 Radioactive Waste Management Site, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2007-01-01

    A flood assessment was conducted at the Area 3 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS) in Nye County, Nevada (Figure 1-1). The study area encompasses the watershed of Yucca Flat, a closed basin approximately 780 square kilometers (km2) (300 square miles) in size. The focus of this effort was on a drainage area of approximately 94 km2 (36 mi2), determined from review of topographic maps and aerial photographs to be the only part of the Yucca Flat watershed that could directly impact the Area 3 RWMS. This smaller area encompasses portions of the Halfpint Range, including Paiute Ridge, Jangle Ridge, Carbonate Ridge, Slanted Buttes, Cockeyed Ridge, and Banded Mountain. The Area 3 RWMS is located on coalescing alluvial fans emanating from this drainage area

  19. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  20. Forest conservation and the clean development mechanism. Lessons from the Costa Rican protected areas project

    International Nuclear Information System (INIS)

    Voehringer, F.

    2004-01-01

    Deforestation is currently the source of about 20% of anthropogenic CO2 emissions. Avoided deforestation has, nonetheless, been ruled out as a Clean Development Mechanism (CDM) category in the Kyoto Protocol's first commitment period, because several methodological issues were considered too difficult to resolve. This paper explores whether CDM issues such as (1) carbon quantification, (2) additionality and baseline setting, (3) leakage risks, (4) non-permanence risks, and (5) sustainable development can be adequately dealt with in large, diversified forest conservation projects. To this aim, it studies the case of the Costa Rican Protected Areas Project (PAP), an Activities Implemented Jointly (AIJ) project which was meant to consolidate the national park system to avoid deforestation, promote the growth of secondary forests and regenerate pastures on an area that, in total, covers 10% of the national territory. The case study examines how the issues mentioned above have been addressed in the project design and in the certification process. It is found that baseline uncertainties are the major problem in this case. Nonetheless, the case suggests the possibility to address CDM issues by specific requirements for project design and very conservative and temporary crediting. Provided that other case studies support this conclusion, eligibility of well-designed forest conservation projects under the CDM in the second commitment period may be worth considering, given the secondary benefits of avoided deforestation

  1. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    ADVANCE [Advanced Driver and Vehicle Advisory Navigation ConcEpt] was a public/private partnership conceived and developed by four founding parties. The founding parties include the Federal Highway Administration (FHWA), the Illinois Department of Transportation (IDOT), the University of Illinois at Chicago and Northwestern University operating together under the auspices of the Illinois Universities Transportation Research Consortium (IUTRC), and Motorola, Inc. The major responsibilities of each party are fully described in the Project agreement. Subsequently, these four were joined on the Steering Committee by the American Automobile Association (AAA). This unique blending of public sector, private sector and university interests, augmented by more than two dozen other private sector participants, provided a strong set of resources for ADVANCE. The ADVANCE test area covered over 300 square miles including portions of the City of Chicago and 40 northwest suburban communities. The Project encompasses the high growth areas adjacent to O`Hare International Airport, the Schaumbura/Hoffman Estates office and retail complexes, and the Lake-Cook Road development corridor. It also includes major sports and entertainment complexes such as the Arlington International Racecourse and the Rosemont Horizon. The population in the area is more than 750,000. This volume provides a summary of the insights and achievements made as a result of this field test, and selected appendices containing more detailed information.

  2. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  3. Using the Gravity Model to Delineate a Trade Area: A Class Project.

    Science.gov (United States)

    Dzik, Anthony J.

    1992-01-01

    Reports that students who might be bored or intimidated by economic geographic theory become enthusiastic when they can apply it to their own experiences. Describes a class project involving fieldwork and in-class analysis on delineating the retail trade area of a small Ohio city. Includes three maps and mathematical formulae for data analysis.…

  4. Initial comments on the aero geophysical information present at the B and C areas of the Itatira (Brazil) project

    International Nuclear Information System (INIS)

    Castro, Neivaldo Araujo de; Castelo Branco, Raimundo Mariano Gomes

    1999-01-01

    The aero geophysical project called Itatira,, accomplished by LASA Engenharia e Prospeccoes S.A., Between September and November/1977 through contract with NUCLEBRAS, corresponds to one of the first project of this gender accomplished in national territory. In this project were flight more than 80 000 km of linear lines, which covered approximately 38 000 km 2 on the precambrian terrains of the Ceara State, NE Brazil. For several reasons, the total area of the project was subdivided in three sub-areas (A, B and C), each one covered by a different airship (LAS, 1977). This paper presents the geophysical information and preliminary interpretations of the areas B and C that were obtained through the integrated use of the soft wares AUTOCAD r. 14, OASIS MONTAJ r.4.2 and ERMAPPER r.5.5. (author)

  5. Remedial investigation sampling and analysis plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Prasad, S.; Martino, L.; Patton, T.

    1995-03-01

    J-Field encompasses about 460 acres at the southern end of the Gunpowder Neck Peninsula in the Edgewood Area of APG (Figure 2.1). Since World War II, the Edgewood Area of APG has been used to develop, manufacture, test, and destroy chemical agents and munitions. These materials were destroyed at J-Field by open burning and open detonation (OB/OD). For the purposes of this project, J-Field has been divided into eight geographic areas or facilities that are designated as areas of concern (AOCs): the Toxic Burning Pits (TBP), the White Phosphorus Burning Pits (WPP), the Riot Control Burning Pit (RCP), the Robins Point Demolition Ground (RPDG), the Robins Point Tower Site (RPTS), the South Beach Demolition Ground (SBDG), the South Beach Trench (SBT), and the Prototype Building (PB). The scope of this project is to conduct a remedial investigation/feasibility study (RI/FS) and ecological risk assessment to evaluate the impacts of past disposal activities at the J-Field site. Sampling for the RI will be carried out in three stages (I, II, and III) as detailed in the FSP. A phased approach will be used for the J-Field ecological risk assessment (ERA).

  6. First stage of INTRAMAP: INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project

    Directory of Open Access Journals (Sweden)

    D. Damaske

    1999-06-01

    Full Text Available INTRAMAP (INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project is an international effort to merge the magnetic data acquired throughout the "Ross Sea Antarctic Sector" (south of 60°S between 135°-255°E including the Transantarctic Mountains (TAM, the Ross Sea, Marie Byrd Land, and the Pacific coast, and also to begin the compilation efforts for new data over the Wilkes Basin. This project is a component of the continental scale Antarctic Digital Magnetic Anomaly Project (ADMAP. The first stage of INTRAMAP addresses the analysis and merging of GITARA (1991-1994 and GANOVEX (1984 aeromagnetic surveys together with ground magnetic data (1984-1989. The combined data sets cover an area of approximately 30 km2 over Victoria Land and adjacent Ross Sea. Map and profile gridding were implemented to integrate the data sets. These approaches are studied for improving existing strategies to adopt for the whole magnetic compilation effort. The final microlevelled grid that we produce is a new tool for regional interpretation of the main tectonic and geologic features of this sector of Antarctica.

  7. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  8. Response to the Comment by G. Emch on projective group representations in quaternionic Hilbert space

    International Nuclear Information System (INIS)

    Adler, S.L.

    1996-01-01

    We discuss the differing definitions of complex and quaternionic projective group representations employed by us and by Emch. The definition of Emch (termed here a strong projective representation) is too restrictive to accommodate quaternionic Hilbert space embeddings of complex projective representations. Our definition (termed here a weak projective representation) encompasses such embeddings, and leads to a detailed theory of quaternionic, as well as complex, projective group representations. copyright 1996 American Institute of Physics

  9. PROJECT-ORIENTED RESOURCE MANAGEMENT SYSTEM FOR RESPONDING TO EMERGENCIES IN RURAL AREAS

    Directory of Open Access Journals (Sweden)

    Андрій Іванович ІВАНУСА

    2016-02-01

    Full Text Available Substantiated way to determine the feasibility of the location of rescue units in the conditions of rural areas. Proposed improving the existing methods of using of forces and means to extinguish fires, emergencies, etc., by involving specially trained volunteer rescue brigades, carrying out daily duty at their place of residence. To improve the interaction of rescue units involved in the reaction to emergency situations improved the system of information and communication management of forces and means. Developed the model diagram of the project environment optimal allocation of resources when creating center responding to emergencies in conditions of encirclement turbulent environment of a sphere of civil protection. Developed 3D-model and WBS-structure of the project creation of center responding to emergencies using modern energy saving technologies that will minimize the use of financial resources on the stages of the realization and exploitation of the project.

  10. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  11. Studies on characteristics of water sources around Kaiga project area

    International Nuclear Information System (INIS)

    Prakash, T.R.; Krishna Bhat, D.; Thimme Gowda, B.; Sherigara, B.S.; Abdul Khadar, A.M.

    1995-01-01

    A systematic and detailed study of characteristics of ground water, Kali river water and rain water samples around Kaiga project area has been undertaken. The analysis of a large number of parameters revealed that the ground waters and Kali river water are of calcium-bicarbonate type as indicated by Romani's modified Hill Piper diagram. The ionic impurities in ground waters and Kali river water are well within the Indian Drinking Water Specifications. The results obtained would serve as base line data for future impact studies. (author). 6 refs., 1 tab

  12. Individual mediodorsal thalamic neurons project to multiple areas of the rat prefrontal cortex: A single neuron-tracing study using virus vectors.

    Science.gov (United States)

    Kuramoto, Eriko; Pan, Shixiu; Furuta, Takahiro; Tanaka, Yasuhiro R; Iwai, Haruki; Yamanaka, Atsushi; Ohno, Sachi; Kaneko, Takeshi; Goto, Tetsuya; Hioki, Hiroyuki

    2017-01-01

    The prefrontal cortex has an important role in a variety of cognitive and executive processes, and is generally defined by its reciprocal connections with the mediodorsal thalamic nucleus (MD). The rat MD is mainly subdivided into three segments, the medial (MDm), central (MDc), and lateral (MDl) divisions, on the basis of the cytoarchitecture and chemoarchitecture. The MD segments are known to topographically project to multiple prefrontal areas at the population level: the MDm mainly to the prelimbic, infralimbic, and agranular insular areas; the MDc to the orbital and agranular insular areas; and the MDl to the prelimbic and anterior cingulate areas. However, it is unknown whether individual MD neurons project to single or multiple prefrontal cortical areas. In the present study, we visualized individual MD neurons with Sindbis virus vectors, and reconstructed whole structures of MD neurons. While the main cortical projection targets of MDm, MDc, and MDl neurons were generally consistent with those of previous results, it was found that individual MD neurons sent their axon fibers to multiple prefrontal areas, and displayed various projection patterns in the target areas. Furthermore, the axons of single MD neurons were not homogeneously spread, but were rather distributed to form patchy axon arbors approximately 1 mm in diameter. The multiple-area projections and patchy axon arbors of single MD neurons might be able to coactivate cortical neuron groups in distant prefrontal areas simultaneously. Furthermore, considerable heterogeneity of the projection patterns is likely, to recruit the different sets of cortical neurons, and thus contributes to a variety of prefrontal functions. J. Comp. Neurol. 525:166-185, 2017. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  13. E-Area Vault Concrete Material Property And Vault Durability/Degradation Projection Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Phifer, M. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-03-11

    Subsequent to the 2008 E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA) (WSRC 2008), two additional E-Area vault concrete property testing programs have been conducted (Dixon and Phifer 2010 and SIMCO 2011a) and two additional E-Area vault concrete durability modeling projections have been made (Langton 2009 and SIMCO 2012). All the information/data from these reports has been evaluated and consolidated herein by the Savannah River National Laboratory (SRNL) at the request of Solid Waste Management (SWM) to produce E-Area vault concrete hydraulic and physical property data and vault durability/degradation projection recommendations that are adequately justified for use within associated Special Analyses (SAs) and future PA updates. The Low Activity Waste (LAW) and Intermediate Level (IL) Vaults structural degradation predictions produced by Carey 2006 and Peregoy 2006, respectively, which were used as the basis for the 2008 ELLWF PA, remain valid based upon the results of the E-Area vault concrete durability simulations reported by Langton 2009 and those reported by SIMCO 2012. Therefore revised structural degradation predictions are not required so long as the mean thickness of the closure cap overlying the vaults is no greater than that assumed within Carey 2006 and Peregoy 2006. For the LAW Vault structural degradation prediction (Carey 2006), the mean thickness of the overlying closure cap was taken as nine feet. For the IL Vault structural degradation prediction (Peregoy 2006), the mean thickness of the overlying closure cap was taken as eight feet. The mean closure cap thicknesses as described here for both E-Area Vaults will be included as a key input and assumption (I&A) in the next revision to the closure plan for the ELLWF (Phifer et al. 2009). In addition, it has been identified as new input to the PA model to be assessed in the ongoing update to the new PA Information UDQE (Flach 2013). Once the UDQE is approved, the SWM Key I

  14. E-Area Vault Concrete Material Property And Vault Durability/Degradation Projection Recommendations

    International Nuclear Information System (INIS)

    Phifer, M. A.

    2014-01-01

    Subsequent to the 2008 E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA) (WSRC 2008), two additional E-Area vault concrete property testing programs have been conducted (Dixon and Phifer 2010 and SIMCO 2011a) and two additional E-Area vault concrete durability modeling projections have been made (Langton 2009 and SIMCO 2012). All the information/data from these reports has been evaluated and consolidated herein by the Savannah River National Laboratory (SRNL) at the request of Solid Waste Management (SWM) to produce E-Area vault concrete hydraulic and physical property data and vault durability/degradation projection recommendations that are adequately justified for use within associated Special Analyses (SAs) and future PA updates. The Low Activity Waste (LAW) and Intermediate Level (IL) Vaults structural degradation predictions produced by Carey 2006 and Peregoy 2006, respectively, which were used as the basis for the 2008 ELLWF PA, remain valid based upon the results of the E-Area vault concrete durability simulations reported by Langton 2009 and those reported by SIMCO 2012. Therefore revised structural degradation predictions are not required so long as the mean thickness of the closure cap overlying the vaults is no greater than that assumed within Carey 2006 and Peregoy 2006. For the LAW Vault structural degradation prediction (Carey 2006), the mean thickness of the overlying closure cap was taken as nine feet. For the IL Vault structural degradation prediction (Peregoy 2006), the mean thickness of the overlying closure cap was taken as eight feet. The mean closure cap thicknesses as described here for both E-Area Vaults will be included as a key input and assumption (I and A) in the next revision to the closure plan for the ELLWF (Phifer et al. 2009). In addition, it has been identified as new input to the PA model to be assessed in the ongoing update to the new PA Information UDQE (Flach 2013). Once the UDQE is approved, the SWM Key I and

  15. End-to-end network models encompassing terrestrial, wireless, and satellite components

    Science.gov (United States)

    Boyarko, Chandler L.; Britton, John S.; Flores, Phil E.; Lambert, Charles B.; Pendzick, John M.; Ryan, Christopher M.; Shankman, Gordon L.; Williams, Ramon P.

    2004-08-01

    Development of network models that reflect true end-to-end architectures such as the Transformational Communications Architecture need to encompass terrestrial, wireless and satellite component to truly represent all of the complexities in a world wide communications network. Use of best-in-class tools including OPNET, Satellite Tool Kit (STK), Popkin System Architect and their well known XML-friendly definitions, such as OPNET Modeler's Data Type Description (DTD), or socket-based data transfer modules, such as STK/Connect, enable the sharing of data between applications for more rapid development of end-to-end system architectures and a more complete system design. By sharing the results of and integrating best-in-class tools we are able to (1) promote sharing of data, (2) enhance the fidelity of our results and (3) allow network and application performance to be viewed in the context of the entire enterprise and its processes.

  16. Global projections of 21st century land-use changes in regions adjacent to Protected Areas.

    Directory of Open Access Journals (Sweden)

    Linda J Beaumont

    Full Text Available The conservation efficiency of Protected Areas (PA is influenced by the health and characteristics of the surrounding landscape matrix. Fragmentation of adjacent lands interrupts ecological flows within PAs and will decrease the ability of species to shift their distribution as climate changes. For five periods across the 21(st century, we assessed changes to the extent of primary land, secondary land, pasture and crop land projected to occur within 50 km buffers surrounding IUCN-designated PAs. Four scenarios of land-use were obtained from the Land-Use Harmonization Project, developed for the Intergovernmental Panel on Climate Change's Fifth Assessment Report (AR5. The scenarios project the continued decline of primary lands within buffers surrounding PAs. Substantial losses are projected to occur across buffer regions in the tropical forest biomes of Indo-Malayan and the Temperate Broadleaf forests of the Nearctic. A number of buffer regions are projected to have negligible primary land remaining by 2100, including those in the Afrotropic's Tropical/Subtropical Grassland/Savanna/Shrubland. From 2010-2050, secondary land is projected to increase within most buffer regions, although, as with pasture and crops within tropical and temperate forests, projections from the four land-use scenarios may diverge substantially in magnitude and direction of change. These scenarios demonstrate a range of alternate futures, and show that although effective mitigation strategies may reduce pressure on land surrounding PAs, these areas will contain an increasingly heterogeneous matrix of primary and human-modified landscapes. Successful management of buffer regions will be imperative to ensure effectiveness of PAs and to facilitate climate-induced shifts in species ranges.

  17. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  18. EnviroAtlas - Ecosystem Service Market and Project Areas, U.S., 2015, Forest Trends' Ecosystem Marketplace

    Data.gov (United States)

    U.S. Environmental Protection Agency — This EnviroAtlas dataset contains polygons depicting the geographic areas of market-based programs, referred to herein as markets, and projects addressing ecosystem...

  19. Deletion of Xpter encompassing the SHOX gene and PAR1 region in familial patients with Leri-Weill Dyschondrosteosis syndrome.

    Science.gov (United States)

    Mutesa, L; Vanbellinghen, J F; Hellin, A C; Segers, K; Jamar, M; Pierquin, G; Bours, V

    2009-01-01

    Heterozygote deletions or mutations of pseudoautosomal 1 region (PAR1) encompassing the short stature homeobox-containing (SHOX) gene cause Leri-Weill Dyschondrosteosis (LWD), which is a dominantly inherited osteochondroplasia characterized by short stature with mesomelic shortening of the upper and lower limbs and Madelung deformity of the wrists. SHOX is expressed by both sex chromosomes in males and females and plays an important role in bone growth and development. Clinically, the LWD expression is variable and more severe in females than males due to sex differences in oestrogen levels. Here, we report two familial cases of LWD with a large Xp terminal deletion (approximately 943 kb) of distal PAR1 encompassing the SHOX gene. In addition, the proband had mental retardation which appeared to be from recessive inheritance in the family.

  20. Project-Based Learning in Geotechnics: Cooperative versus Collaborative Teamwork

    Science.gov (United States)

    Pinho-Lopes, Margarida; Macedo, Joaquim

    2016-01-01

    Since 2007/2008 project-based learning models have been used to deliver two fundamental courses on Geotechnics in University of Aveiro, Portugal. These models have evolved and have encompassed either cooperative or collaborative teamwork. Using data collected in five editions of each course (Soil Mechanics I and Soil Mechanics II), the different…

  1. METHODOLOGY FOR PROJECTION OF OCCUPATIONAL TRENDS IN THE DENVER STANDARD METROPOLITAN STATISTICAL AREA.

    Science.gov (United States)

    FISHMAN, LESLIE; AND OTHERS

    THE FINAL STAGE OF A PROGRAM FOR ACHIEVING A BALANCE BETWEEN THE AGGREGATE SUPPLY AND DEMAND FOR LABOR IS THE DISTRIBUTION OF THE INDUSTRY EMPLOYMENT ESTIMATES INTO OCCUPATIONAL REQUIREMENTS BASED ON PROJECTIONS OF OCCUPATIONAL PATTERNS BY INDUSTRY. THIS CAN BE USED TO EVALUATE POTENTIAL AREAS OF SUBSTANTIAL SURPLUS OR SHORTAGE, AND PROVIDE THE…

  2. Tanjung Enim IV coal exploration project. Volume I. Exploration work of South Arahan area in 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In the 1996-2001 period, the project has been carried out in Banjarsari/Tanjung Enim areas and South Arahan area of South Sumatra. This report described the results of the project conducted in South Arahan area in 2000/2001. The area for survey is 40km{sup 2} in north block and 10km{sup 2} in south block, and the following were carried out: surface reconnaissance, geological mapping, drilling, geophysical logging, seismic survey (seismic reflection survey and VSP survey), and sampling for coal quality analysis. The number of boreholes drilled was 11 including 8 in north area and 3 in south area, and the total length was 1,847m. Physical logging was executed in all 11 boreholes, and VSP survey was done in one borehole per each block. As to the hydraulic test, water poring test was conducted at 3 boreholes in north block. In the report, the results of the survey were classified into the following 4 items: 1) outline of the survey; 2) field activities; 3) analysis of the results; 4) summarization. (NEDO)

  3. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  4. Outcomes from the USDA/ARS area-wide project for management of the Asian tiger mosquito, Aedes albopictus

    Science.gov (United States)

    The Asian tiger mosquito, Aedes albopictus, became established in the continental US in 1985 and now infests 30 states. In 2007 the USDA Agricultural Research Service funded an “area-wide” project focused on the management of this species. The project was a unique federal, state, local collaborati...

  5. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  6. Identification of evolutionary hotspots based on genetic data from multiple terrestrial and aquatic taxa and gap analysis of hotspots in protected lands encompassed by the South Atlantic Landscape Conservation Cooperative.

    Science.gov (United States)

    Robinson, J.; Snider, M.; Duke, J.; Moyer, G.R.

    2014-01-01

     The southeastern United States is a recognized hotspot of biodiversity for a variety of aquatic taxa, including fish, amphibians, and mollusks. Unfortunately, the great diversity of the area is accompanied by a large proportion of species at risk of extinction . Gap analysis was employed to assess the representation of evolutionary hotspots in protected lands w h ere an evolutionary hotspot was defined as an area with high evolutionary potential and measured by atypical patterns of genetic divergence, genetic diversity, and to a lesser extent genetic similarity across multiple terrestrial or aquatic taxa. A survey of the primary literature produced 16 terrestrial and 14 aquatic genetic datasets for estimation of genetic divergence and diversity. Relative genetic diversity and divergence values for each terrestrial and aquatic dataset were used for interpolation of multispecies genetic surfaces and subsequent visualization using ArcGIS. The multispecies surfaces interpolated from relative divergences and diversity data identified numerous evolutionary hotspots for both terrestrial and aquatic taxa , many of which were afforded some current protection. For instance, 14% of the cells identified as hotspots of aquatic diversity were encompassed by currently protected areas. Additionally, 25% of the highest 1% of terrestrial diversity cells were afforded some level of protection. In contrast, areas of high and low divergence among species, and areas of high variance in diversity were poorly represented in the protected lands. Of particular interest were two areas that were consistently identified by several different measures as important from a conservation perspective. These included an area encompassing the panhandle of Florida and southern Georgia near the Apalachicola National Forest (displaying varying levels of genetic divergence and greater than average levels of genetic diversity) and a large portion of the coastal regions of North and South Carolina

  7. Improving Technological Competency in Nursing Students: The Passport Project

    Directory of Open Access Journals (Sweden)

    Julie Edwards

    2011-07-01

    Full Text Available Integration of informatics competency into a nursing curriculum is important to ensure success throughout the education and career of contemporary nursing students. As enrollment in nursing programs increases, the diverse population of students from many different cultural and socioeconomic backgrounds presents a challenge for faculty in addressing unique learning needs. Competency in informatics will allow the beginning nursing student to navigate the on-line teaching software used by colleges. With rigorous expectations in nursing programs, students may feel overwhelmed with assignments, organization, and time management. Frustration may build when students struggle with basic informatics competency, often leaving them unable to navigate instructional websites or work with necessary on-line learning content. The purpose of this project, Passport Project for Nursing Success, was to assess the skills, knowledge, and informatics comfort level of students, while providing computer training and teaching for beginning nursing students in an undergraduate nursing program in Central Illinois. The community college encompassed students from a ten county area, with 20 percent of the student population enrolled in the Applied Science curriculum. Initial implementation occurred prior to the students' first nursing course and emphasized basic skills necessary to navigate on-line learning software, library search engines, and electronic communication. The greatest barrier to successful implementation was faculty resistance and academic support during completion of the initial implementation of the Passport Project. Post- project surveys indicated overwhelming student support for the education received and improved retention rates of first semester nursing students.

  8. Area Handbook Series: Brazil: A Country Study

    Science.gov (United States)

    1982-12-01

    Encompassing almost half the South American conti- nent and bordering every South American country except Ecuador and Chile , Brazil ranks as the fifth largest...and agricultural projects related to the program was slowed. Expansion of the sugarcane acreage was less 184 Construction site, Aguas Claras mine near...Development-OECD) purchased 60 percent of Brazil’s exports. Among Brazil’s 10 largest export markets, only Argentina (US$718 million), Chile (US$363 million

  9. Geological events in submerged areas: attributes and standards in the EMODnet Geology Project

    Science.gov (United States)

    Fiorentino, A.; Battaglini, L.; D'Angelo, S.

    2017-12-01

    EMODnet Geology is a European Project which promotes the collection and harmonization of marine geological data mapped by various national and regional mapping projects and recovered in the literature, in order to make them freely available through a web portal. Among the several features considered within the Project, "Geological events and probabilities" include submarine landslides, earthquakes, volcanic centers, tsunamis, fluid emissions and Quaternary faults in European Seas. Due to the different geological settings of European sea areas it was necessary to elaborate a comprehensive and detailed pattern of Attributes for the different features in order to represent the diverse characteristics of each occurrence. Datasets consist of shapefiles representing each event at 1:250,000 scale. The elaboration of guidelines to compile the shapefiles and attribute tables was aimed at identifying parameters that should be used to characterize events and any additional relevant information. Particular attention has been devoted to the definition of the Attribute table in order to achieve the best degree of harmonization and standardization according to the European INSPIRE Directive. One of the main objectives is the interoperability of data, in order to offer more complete, error-free and reliable information and to facilitate exchange and re-use of data even between non-homogeneous systems. Metadata and available information collected during the Project is displayed on the Portal (http://www.emodnet-geology.eu/) as polygons, lines and points layers according to their geometry. By combining all these data it might be possible to elaborate additional thematic maps which could support further research as well as land planning and management. A possible application is being experimented by the Geological Survey of Italy - ISPRA which, in cooperation with other Italian institutions contributing to EMODnet Geology, is working at the production of an update for submerged areas

  10. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    International Nuclear Information System (INIS)

    2011-01-01

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  11. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    Energy Technology Data Exchange (ETDEWEB)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    2011-06-20

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  12. Projection of US LWR spent fuel storage requirements

    International Nuclear Information System (INIS)

    Fletcher, J.F.; Cole, B.M.; Purcell, W.L.; Rau, R.G.

    1982-11-01

    The spent fuel storage requirements projection is based on data supplied for each operating or planned nuclear power power plant by the operting utilities. The data supplied by the utilities encompassed details of plant operating history, past records of fuel discharges, current inventories in reactor spent fuel storage pools, and projections of future discharge patterns. Data on storage capacity of storage pools and on characterization of the discharged fuel are also included. The data supplied by the utilities, plus additional data from other appropriate sources, are maintained on a computerized data base by Pacific Northwest Laboratory. The spent fuel requirements projection was based on utility data updated and verified as of December 31, 1981

  13. Closure report for CAU No. 416: Project Shoal Area

    International Nuclear Information System (INIS)

    1998-01-01

    This Closure Report provides the documentation for closure of the US Department of Energy/Nevada Operations Office (DOE/NV) Project Shoal Area (PSA) Surface Corrective Action Unit (CAU) 416. CAU 416 consists of a mud pit, muckpile, and housekeeping site. The PSA is located approximately 48.3 kilometers (30 miles) southeast of Fallon, Nevada. The mud pit was the result of drilling activities at the PSA in 1963. Investigation activities completed in 1996 determined drilling mud in the mud pit was impacted with petroleum hydrocarbons in excess of the State of Nevada 100 milligram per kilogram (mg/kg). The muckpile consists of broken granite from emplacement shaft and drift (tunnel) mining activities at the PSA in 1963. The housekeeping site consisted of approximately 20 used, empty, rusted, steel 0.9 liter (1 quart) oil cans

  14. Area Recommendation Report for the Crystalline Repository Project: Volume 1, Draft

    International Nuclear Information System (INIS)

    1986-01-01

    This Draft Area Recommendation Report for the Crystalline Repository Project identifies portions of crystalline rock bodies as proposed potentially acceptable sites for consideration in the second high-level radioactive waste repository program. The US Department of Energy evaluated available geologic and environmental data for 235 crystalline rock bodies in the North Central, Northeastern, and Southeastern regions to identify preliminary candidate areas. Further evaluation of these preliminary candidate areas resulted in the selection of 12 as proposed potentially acceptable sites. The 12 proposed potentially acceptable sites are located in the States of Georgia (1), Maine (2), Minnesota (3), New Hampshire (1), North Carolina (2), Virginia (2), and Wisconsin (1). The data, analyses, and rationale with which the 12 proposed potentially acceptable sites were selected are presented in this draft report. The analyses presented demonstrate that the evidence available for each proposed potentially acceptable site supports (1) a finding that the site is not disqualified in accordance with the application requirements of Appendix III of the siting guidelines and (2) a decision to proceed with the continued investigation of the site on the basis of the favorable and potentially adverse conditions identified to date. Once this report is finalized, potentially acceptable sites in crystalline rock will be formally identified by the Secretary of Energy, in accordance with the DOE siting guidelines. These potentially acceptable sites will be investigated and evaluated in more detail during the area phase of the siting process. An additional eight areas, which meet the requirements for identification as potentially acceptable sites, will retain their designation as candidate areas

  15. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    Rick Findlay

    2006-01-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  16. Projected impacts of climate change on a continent-wide protected area network

    DEFF Research Database (Denmark)

    Hole, David G; Willis, Stephen G; Pain, Deborah J

    2009-01-01

    Despite widespread concern, the continuing effectiveness of networks of protected areas under projected 21st century climate change is uncertain. Shifts in species' distributions could mean these resources will cease to afford protection to those species for which they were originally established...... species). Persistence of suitable climate space across the network as a whole, however, is notably high, with 88-92% of priority species retaining suitable climate space in >or= 1 IBA(s) in which they are currently found. Only 7-8 priority species lose climatic representation from the network. Hence......, despite the likelihood of significant community disruption, we demonstrate that rigorously defined networks of protected areas can play a key role in mitigating the worst impacts of climate change on biodiversity....

  17. Ground-water investigations of the Project Gnome area, Eddy and Lea Counties, New Mexico

    Science.gov (United States)

    Cooper, J.B.

    1962-01-01

    The U.S. Atomic Energy Commission, through the Office of Test Operations, Albuquerque Operations Office, plans to detonate a nuclear device in a massive salt bed 1,200 feet beneath the land surface. The project, known as Project Gnome, is an element of the Plowshare program--a study of peacetime applications of nuclear fission. The location of the proposed underground shot is in a sparsely-populated area in southeastern Eddy County, N. Mex., east of the Pecos River and about 25 miles southeast of the city of Carlsbad. The area is arid to Semiarid and ground water is a vital factor in the economic utilization of the land, which is primarily used for stock raising. An investigation of the Project Gnome site and surrounding area for the purposes of evaluating the ground-water resources and the possible effect upon them from the detonation of the nuclear shot was desired by the Commission. This report describes work done by the U.S. Geological Survey on behalf of the Commission and presents results of the investigation of the ground-water resources and geology of the area. The most intensive investigations were made within a 15-mile radius of the site of Project Gnome and mainly on the east side of the Pecos River. The total area of study of over 1,200 square miles includes parts of Eddy and Lea Counties, N. Mex. The Project Gnome site is in the sedimentary Delaware Basin. It is underlain by about 18,000 feet of sedimentary rocks ranging in age from Ordovician to Recent. Upper Permian evaporitic rocks, which contain the principal source of potash available in the United States, are worked in nearby mines. The potash minerals are found in a massive salt bed about 1,400 feet thick in the Salado Formation of Permian age. The land surface of the area is covered mostly by a wind-blown sand and caliche; however, rocks of the Rustler Formation of Permian age and younger rocks of Permian, Triassic, Pleistocene(?) and Recent age crop out at several localities. Solution by

  18. Terrain Correction on the moving equal area cylindrical map projection of the surface of a reference ellipsoid

    Science.gov (United States)

    Ardalan, A.; Safari, A.; Grafarend, E.

    2003-04-01

    An operational algorithm for computing the ellipsoidal terrain correction based on application of closed form solution of the Newton integral in terms of Cartesian coordinates in the cylindrical equal area map projected surface of a reference ellipsoid has been developed. As the first step the mapping of the points on the surface of a reference ellipsoid onto the cylindrical equal area map projection of a cylinder tangent to a point on the surface of reference ellipsoid closely studied and the map projection formulas are computed. Ellipsoidal mass elements with various sizes on the surface of the reference ellipsoid is considered and the gravitational potential and the vector of gravitational intensity of these mass elements has been computed via the solution of Newton integral in terms of ellipsoidal coordinates. The geographical cross section areas of the selected ellipsoidal mass elements are transferred into cylindrical equal area map projection and based on the transformed area elements Cartesian mass elements with the same height as that of the ellipsoidal mass elements are constructed. Using the close form solution of the Newton integral in terms of Cartesian coordinates the potential of the Cartesian mass elements are computed and compared with the same results based on the application of the ellipsoidal Newton integral over the ellipsoidal mass elements. The results of the numerical computations show that difference between computed gravitational potential of the ellipsoidal mass elements and Cartesian mass element in the cylindrical equal area map projection is of the order of 1.6 × 10-8m^2/s^2 for a mass element with the cross section size of 10 km × 10 km and the height of 1000 m. For a 1 km × 1 km mass element with the same height, this difference is less than 1.5 × 10-4 m^2}/s^2. The results of the numerical computations indicate that a new method for computing the terrain correction based on the closed form solution of the Newton integral in

  19. Large Area Projection Microstereolithography: Characterization and Optimization of 3D Printing Parameters

    Energy Technology Data Exchange (ETDEWEB)

    Ng, Melissa R. [Ohlone College, Fremont, CA (United States); Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moran, Bryan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bekker, Logan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dudukovic, Nikola [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-08-12

    Large Area Projection Microstereolithography (LAPμSL) is a new technology that allows the additive manufacture of parts that have feature sizes spanning from centimeters to tens of microns. Knowing the accuracy of builds from a system like this is a crucial step in development. This project explored the capabilities of the second and newest LAPμSL system that was built by comparing the features of actual builds to the desired structures. The system was then characterized in order to achieve the best results. The photo polymeric resins that were used were Autodesk PR48 and HDDA. Build parameters for Autodesk PR48 were found that allowed the prints to progress while using the full capacity of the system to print quality parts in a relatively short amount of time. One of the larger prints in particular had a print time that was nearly eighteen times faster than it would have been had printed in the first LAPμSL system. The characterization of HDDA resin helped the understanding that the flux of the light projected into the resin also affected the quality of the builds, rather than just the dose of light given. Future work for this project includes exploring the use of other resins in the LAPμSL systems, exploring the use of Raman Spectroscopy to analyze builds, and completing the characterization of the LAPμSL system.

  20. Safe-Taipei a Program Project for Strong Motions, Active Faults, and Earthquakes in the Taipei Metropolitan Area

    Science.gov (United States)

    Wang, Jeen-Hwa

    Strong collision between the Eurasian and Philippine Sea Plates causes high seismicity in the Taiwan region, which is often attacked by large earthquakes. Several cities, including three mega-cities, i.e., Taipei, Taichung, and Kaoshung, have been constructed on western Taiwan, where is lying on thick sediments. These cities, with a high-population density, are usually a regional center of culture, economics, and politics. Historically, larger-sized earthquakes, e.g. the 1935 Hsingchu—Taichung earthquake and the 1999 Chi—Chi earthquake, often caused serious damage on the cities. Hence, urban seismology must be one of the main subjects of Taiwan's seismological community. Since 2005, a program project, sponsored by Academia Sinica, has been launched to investigate seismological problems in the Taipei Metropolitan Area. This program project is performed during the 2005—2007 period. The core research subjects are: (1) the deployment of the Taipei Down-hole Seismic Array; (2) the properties of earthquakes and active faults in the area; (3) the seismogenic-zone structures, including the 3-D velocity and Q structures, of the area; (4) the characteristics of strong-motions and sites affects; and (5) strong-motion prediction. In addition to academic goals, the results obtained from the program project will be useful for seismic hazard mitigation not only for the area but also for others.

  1. Research and Practice of Uav Remote Sensing in the Monitoring and Management of Construction Projects in Riparian Areas

    Science.gov (United States)

    Yu, J.; Gan, Z.; Zhong, L.; Deng, L.

    2018-04-01

    The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  2. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  3. Improving extinction projections across scales and habitats using the countryside species-area relationship.

    Science.gov (United States)

    Martins, Inês Santos; Pereira, Henrique Miguel

    2017-10-10

    The species-area relationship (SAR) has been often used to project species extinctions as a consequence of habitat loss. However, recent studies have suggested that the SAR may overestimate species extinctions, at least in the short-term. We argue that the main reason for this overestimation is that the classic SAR ignores the persistence of species in human-modified habitats. We use data collected worldwide to analyse what is the fraction of bird and plant species that remain in different human-modified habitats at the local scale after full habitat conversion. We observe that both taxa have consistent responses to the different land-use types, with strongest reductions in species richness in cropland across the globe, and in pasture in the tropics. We show that the results from these studies cannot be linearly scaled from plots to large regions, as this again overestimates the impacts of land-use change on biodiversity. The countryside SAR provides a unifying framework to incorporate both the effect of species persistence in the landscape matrix and the non-linear response of the proportion of species extinctions to sampling area, generating more realistic projections of biodiversity loss.

  4. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Directory of Open Access Journals (Sweden)

    D. H. Yan

    2012-08-01

    Full Text Available The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  5. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Science.gov (United States)

    Yan, D. H.; Wang, H.; Li, H. H.; Wang, G.; Qin, T. L.; Wang, D. Y.; Wang, L. H.

    2012-08-01

    The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  6. An aerial radiological survey of the West Valley Demonstration Project and surrounding area, West Valley, New York

    International Nuclear Information System (INIS)

    Berry, H.A.

    1991-09-01

    An aerial radiological survey of the West Valley Demonstration Project and the surrounding area was conducted from mid-August through early September 1984 by EG ampersand G Energy Measurements, Inc. for the United States Department of Energy. The radiological survey was part of the United States Department of Energy Comprehensive Integrated Remote Sensing (CIRS) program, which provides state-of-the-art remote sensing to support the needs of the various DOE facilities. The survey consisted of airborne measurements of both natural and man-made gamma radiation emanating from the terrestrial surface. These measurements allowed an estimate of the distribution of isotopic concentrations in the area surrounding the project site. Results are reported as isopleths superimposed on aerial photographs of the area. Gamma ray energy spectra are also presented for the net man-made radionuclides. 8 refs., 16 figs., 9 tabs

  7. Shuar Women’s Responses to Socio-Environmental Conflict in the Area of the Mirador Project (Ecuador

    Directory of Open Access Journals (Sweden)

    Ana Dolores Verdú Delgado

    2017-06-01

    Full Text Available The Mirador Project is a large-scale mining project located in the Cordillera del Cóndor that plans to extract 60,000 metric tons of rock daily beginning in 2018. The severity of socio-environmental impacts resulting from the Mirador Project are amplified due to the fact that the project takes place in an area largely inhabited by the indigenous Shuar who have constitutional rights to maintain control over their ancestral territories. In this paper I analyze the impact that large-scale mining has on the S huar female population by examining their perception of the conflict in question. Data is analyzed within the ecofeminist discourse focusing on the particularity of rural women in the global South in relation to nature and development.

  8. Stratigraphy and tectonics of Permo-Triassic basins in the Netherlands and surrounding areas

    NARCIS (Netherlands)

    Geluk, M.C.

    2005-01-01

    This thesis addresses different aspects of the geological development during the Permian and Triassic (300 to 200 Ma) of the Netherlands and surrounding areas. The study area encompasses the Southern Permian Basin (SPB), a large intracratonic basin stretched out from the United Kingdom in the west

  9. An aerial radiological survey of the Fernald Environmental Management Project and surrounding area, Fernald, Ohio

    International Nuclear Information System (INIS)

    Phoenix, K.A.

    1997-04-01

    An aerial radiological survey was conducted from May 17--22, 1994, over a 36 square mile (93 square kilometer) area centered on the Fernald Environmental Management Project located in Fernald, Ohio. The purpose of the survey was to detect anomalous gamma radiation in the environment surrounding the plant. The survey was conducted at a nominal altitude of 150 feet (46 meters) with a line spacing of 250 feet (76 meters). A contour map of the terrestrial gamma exposure rate extrapolated to 1 meter (3.3 feet) above ground was prepared and overlaid on an aerial photograph of the area. Analysis of the data for man made sources showed five sites within the boundaries of the Fernald Environmental Management Project having elevated readings. The exposure rates outside the plant boundary were typical of naturally occurring background radiation. Soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries to supplement the aerial data. It was concluded that although the radionuclides identified in the high-exposure-rate areas are naturally occurring, the levels encountered are greatly enhanced due to industrial activities at the plant

  10. Area-specific development of distinct projection neuron subclasses is regulated by postnatal epigenetic modifications

    Science.gov (United States)

    Harb, Kawssar; Magrinelli, Elia; Nicolas, Céline S; Lukianets, Nikita; Frangeul, Laura; Pietri, Mariel; Sun, Tao; Sandoz, Guillaume; Grammont, Franck; Jabaudon, Denis; Studer, Michèle; Alfano, Christian

    2016-01-01

    During cortical development, the identity of major classes of long-distance projection neurons is established by the expression of molecular determinants, which become gradually restricted and mutually exclusive. However, the mechanisms by which projection neurons acquire their final properties during postnatal stages are still poorly understood. In this study, we show that the number of neurons co-expressing Ctip2 and Satb2, respectively involved in the early specification of subcerebral and callosal projection neurons, progressively increases after birth in the somatosensory cortex. Ctip2/Satb2 postnatal co-localization defines two distinct neuronal subclasses projecting either to the contralateral cortex or to the brainstem suggesting that Ctip2/Satb2 co-expression may refine their properties rather than determine their identity. Gain- and loss-of-function approaches reveal that the transcriptional adaptor Lmo4 drives this maturation program through modulation of epigenetic mechanisms in a time- and area-specific manner, thereby indicating that a previously unknown genetic program postnatally promotes the acquisition of final subtype-specific features. DOI: http://dx.doi.org/10.7554/eLife.09531.001 PMID:26814051

  11. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  12. Technical Area V (TA-V) transformation project close-out report.

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

  13. PERCEPTION OF SOCIO-ENVIRONMENTAL CONFLICTS IN MINING AREAS: THE CASE OF THE MIRADOR PROJECT IN ECUADOR

    OpenAIRE

    SÁNCHEZ-VÁZQUEZ,LUIS; ESPINOSA,MARÍA GABRIELA; EGUIGUREN,MARÍA BEATRIZ

    2016-01-01

    Abstract In order to analyse the socio-environmental conflicts it is essential to pay attention to people's perception, because environmental problems can lead to different forms of conflict according to local economic and socio-cultural context. The main objective of this research is to determine the perception of the public about the different socio-environmental conflicts in the area of influence of the Mirador Project, the first project of large-scale mining in Ecuador. To do so, a repres...

  14. 2013 Oregon Department of Geology and Mineral Industries (DOGAMI) Oregon Lidar: Scappoose

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — WSI collected Light Detection and Ranging (LiDAR) data for the Oregon LiDAR Consortium (OLC) Scappoose study area. The Scappoose project area encompasses...

  15. 2013 Oregon Department of Geology and Mineral Industries (DOGAMI) Oregon Lidar DEM: Scappoose

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — WSI collected Light Detection and Ranging (LiDAR) data for the Oregon LiDAR Consortium (OLC) Scappoose study area. The Scappoose project area encompasses...

  16. Development of a Groundwater Management Model for the Project Shoal Area

    Energy Technology Data Exchange (ETDEWEB)

    G. Lamorey; S. Bassett; R. Schumer; D. Boyle; G. Pohll; J. Chapman

    2006-09-01

    This document describes the development of a user-friendly and efficient groundwater management model of the Project Shoal Area (PSA and surrounding area that will allow the U.S. Department of Energy and State of Nevada personnel to evaluate the impact of proposed water-use scenarios. The management model consists of a simple hydrologic model within an interactive groundwater management framework. This framework is based on an object user interface that was developed by the U.S. Geological Survey and has been used by the Desert Research Institute researchers and others to couple disparate environmental resource models, manage temporal and spatial data, and evaluate model results for management decision making. This framework was modified and applied to the PSA and surrounding Fairview Basin. The utility of the management model was demonstrated through the application of hypothetical future scenarios including mineral mining, regional expansion of agriculture, and export of water to large urban areas outside the region. While the results from some of the scenarios indicated potential impacts to groundwater levels near the PSA and others did not, together they demonstrate the utility of the management tool for the evaluation of proposed changes in groundwater use in or near the PSA.

  17. Training survey -- educational profile for Hanford HANDI 2000 project

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    Fluor Daniel Hanford, Inc. (FDH) is currently adopting streamlined business processes through integrated software solutions. Replacing the legacy software (current/replacement systems, attached) also avoids significant maintenance required to resolve Year 2000 issues. This initiative is being referred to as `HANDI 2000`. The software being implemented in the first phase of this project includes Indus International`s PASSPORT Software, Peoplesoft and Primavera P3 Software. The project, which encompasses all the system replacements that will occur, has been named `HANDI 2000.` The PASSPORT applications being implemented are Inventory Management, Purchasing, Contract Management, Accounts Payable, and MSDS (Material Safety Data Sheets).

  18. USGS Atchafalaya 2 LiDAR

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Light Detection and Ranging (LiDAR) dataset is a survey of the Atchafalaya Basin project area. The entire survey area for Atchafalaya encompasses approximately...

  19. On Financing of Urban Transition viewed from the Oresund Area

    DEFF Research Database (Denmark)

    Haldrup, Karin; Snällfot, David

    2014-01-01

    The “urban transition” agenda is as a conglomerate of ambitions derived from international policy documents and as applied in the Oresund area. Encompassing locally set goals for (i) climate change mitigation; (ii) energy efficiency; and (iii) human wellbeing in the built environment. Its...

  20. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  1. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  2. The Greenland Analogue Project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    Energy Technology Data Exchange (ETDEWEB)

    Engstroem, Jon; Paananen, Markku (Geological Survey of Finland (Finland)); Klint, Knud Erik (The National Geological Survey of Denmark and Greenland (Denmark))

    2012-02-15

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two boreholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area, referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  3. The Greenland analogue project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    Energy Technology Data Exchange (ETDEWEB)

    Engstroem, J.; Paananen, M. [GTK Geological Survey of Finland, Espoo (Finland); Klint, K.E. [GEUS Geological Survey of Denmark and Greenland, Copenhagen (Denmark)

    2012-02-15

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP Geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice-sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two drillholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the Geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP Geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP Geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area; referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  4. The Greenland analogue project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    International Nuclear Information System (INIS)

    Engstroem, J.; Paananen, M.; Klint, K.E.

    2012-02-01

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP Geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice-sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two drillholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the Geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP Geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP Geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area; referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  5. The Greenland Analogue Project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    International Nuclear Information System (INIS)

    Engstroem, Jon; Paananen, Markku; Klint, Knud Erik

    2012-02-01

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two boreholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area, referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  6. New generation quantitative x-ray microscopy encompassing phase-contrast

    International Nuclear Information System (INIS)

    Wilkins, S.W.; Mayo, S.C.; Gureyev, T.E.; Miller, P.R.; Pogany, A.; Stevenson, A.W.; Gao, D.; Davis, T.J.; Parry, D.J.; Paganin, D.

    2000-01-01

    Full text: We briefly outline a new approach to X-ray ultramicroscopy using projection imaging in a scanning electron microscope (SEM). Compared to earlier approaches, the new approach offers spatial resolution of ≤0.1 micron and includes novel features such as: i) phase contrast to give additional sample information over a wide energy range, rapid phase/amplitude extraction algorithms to enable new real-time modes of microscopic imaging widespread applications are envisaged to fields such as materials science, biomedical research, and microelectronics device inspection. Some illustrative examples are presented. The quantitative methods described here are also very relevant to X-ray projection microscopy using synchrotron sources

  7. Demographic and socio-economic determinants of post-neonatal deaths in a special project area of rural northern India.

    Science.gov (United States)

    Kabir, Zubair

    2003-07-01

    The demographic and socio-economic determinants of post-neonatal deaths (n = 475) in a special project area of rural northern India (Ballabgarh) were ascertained from 1991 to 1999 using the electronic database system of the project area for data extraction, and were compared with the eligible living children of the same age using a matched population-based case-control study design. Similar determinants were also ascertained in neonatal deaths (n = 212) using the same study design. After controlling for the potential confounders using conditional logistic regression analyses, lower caste (a proxy measure for low socio-economic conditions in rural India) was found to be significantly associated with higher post-neonatal deaths (OR = 2.21). Higher maternal age (>30 years) and fathers' lower educational levels were significantly associated with higher neonatal deaths, in addition to higher post-neonatal deaths in the same area.

  8. CHAOS Chronicles, Focusing on Failures and Possible Improvements in IT Projects

    Directory of Open Access Journals (Sweden)

    Jim Johnson

    2016-10-01

    Full Text Available The Standish Group started in 1985 in the business of IT markets forecasts and predictions using Artificial Intelligence and cased-based reasoning technology. In 1994 we turned to predicting project outcomes, improving software development, and building a world-class database. Standish's cumulative research encompasses 22 years of data on why projects succeed or fail, representing more than 50,000 active completed IT projects. In this paper we clarify how we got here, where we are, and how academia next to practitioners can be part of the next stage of the CHAOS journey. The vehicle which drives our journey is the CHAOS University System.

  9. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  10. Future climate and wildfire: ecosystem projections of area burned in the western US

    Science.gov (United States)

    Littell, J. S.; Duffy, P.; Battisti, D. S.; McKenzie, D.; Peterson, D. L.

    2010-12-01

    The area burned by fire in ecosystems of the western United States has been closely linked to climate in the paleoecological record and in the modern record. Statistical models of area burned show that the climatic controls on area burned vary with vegetation type (Littell et al. 2009). In more arid or systems (grasslands, shrublands, woodlands), antecedent climatic controls on fire were associated first with the production of fuels and secondarily with drought in the year of fire. These relationships typically manifested as wetter and sometimes cooler conditions in the seasons prior to the fire season. Area burned in forest ecosystems and some woodlands was primarily associated with drought conditions, specifically increased temperature and decreased precipitation in the year of fire and the seasons leading up to the fire season. These climatic controls indicate the role of climate in drying existing fuels. Statistical fire models trained on the late 20th century for ecoprovinces in the West would be useful for projecting area burned, at least until vegetation type conversion driven by climate and disturbance occurs. To that end, we used ~ 2.5 degree gridded future climate fields derived for a multi-GCM ensemble of 1C and 2C temperature increase forcing to develop future ecoprovince monthly and seasonal average temperature and associated precipitation and used these as predictors in statistical fire models of future projected area burned. We also conducted modeling scenarios with the ensemble temperature increase paired with historical precipitation. Most ecoprovinces had increases in area burned, with a range of ~ 67% to over 600% . Ecoprovinces that are primarily sensitive to precipitation changes exhibit smaller increases than those most sensitive to temperature (forest systems). We also developed exceedance probabilities. Some ecoprovinces show large increases in area burned but low exceedance probabilities, suggest that the area burned is concentrated more

  11. Brainstem projections of neurons located in various subdivisions of the dorsolateral hypothalamic area – an anterograde tract-tracing study

    OpenAIRE

    Rege Sugárka Papp; Rege Sugárka Papp; Miklos ePalkovits; Miklos ePalkovits

    2014-01-01

    The projections from the dorsolateral hypothalamic area (DLH) to the lower brainstem have been investigated by using biotinylated dextran amine (BDA), an anterograde tracer in rats. The DLH can be divided into 3 areas (dorsomedial hypothalamus, perifornical area, lateral hypothalamic area), and further subdivided into 8 subdivisions. After unilateral stereotaxic injections of BDA into individual DLH subdivisions, the correct sites of injections were controlled histologically, and the distribu...

  12. Helwan University Project Developing Primary School Pupils' Abilities and Skills at Some Egyptian Underprivileged Areas (Slums). (Field Study)

    Science.gov (United States)

    El-Tayeb, Mahmoud N.; El Nashar, Mohamed; Zeid, Mai M.; El-Sayed, Magda; Ramadan, Mohamed A.; Hamdi, Safia M.; El-Affy, Nabila; Ebeid, Amina K.; El-Marasi, Sonia S.; Abou-Elmahty, Maher

    2010-01-01

    Through directing concerted efforts and educational services of seven Faculties of Helwan University towards socially underprivileged pupils in slum areas (EL-Marg area in big Cairo) this research project had two main aims: firstly, modifying a set of arbitrary behaviors of those pupils, in a trial to develop some behavior skills associated with…

  13. Environmental Assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  14. An aerial radiological survey of the project Rio Blanco and surrounding area

    International Nuclear Information System (INIS)

    Singman, L.V.

    1994-11-01

    A team from the Remote Sensing Laboratory in Las Vegas, Nevada, conducted an aerial radiation survey of the area surrounding ground zero of Project Rio Blanco in the northwestern section of Colorado in June 1993. The object of the survey was to determine if there were man-made radioisotopes on or near the surface resulting from a nuclear explosion in 1972. No indications of surface contamination were found. A search for the cesium-137 radioisotope was negative. The Minimum Detectable Activity for cesium-137 is presented for several detection probabilities. The natural terrestrial exposure rates in units of Roentgens per hour were mapped and are presented in the form of a contour map over-laid on an aerial photograph. A second team made independent ground-based measurements in four places within the survey area. The average agreement of the ground-based with aerial measurements was six percent

  15. A landscape project for the coexistence of agriculture and nature: a proposal for the coastal area of a Natura 2000 site in Sicily (Italy

    Directory of Open Access Journals (Sweden)

    Lara Riguccio

    2016-06-01

    Full Text Available Many rural coastal Mediterranean areas suffer from great anthropomorphic pressure. This is due to intensive agriculture, and construction for residential, tourism and industrial uses. The present work investigates the idea of using a landscape project in the Gulf of Gela in South Sicily to recover the dunes and the area behind them. The method used is based on the literature and will evaluate and interpret the dynamics of the landscape, so as to draw up a landscape plan, which can be used to help sustain the assets of the area, in a way, which is compatible with conserving nature. This method was tested in the LIFE11-Leopoldia project, funded by the European Union. The results of the study form part of the landscape project. This project is aimed at connecting the different productive zones in the area, protecting the natural environments and the rural historical patrimony, through combining the modern road networks with the older slower, historic infrastructure. Three different levels of landscape management are proposed: total protection (the dunes, high-level protection (the area behind the dunes where traditional agriculture is practised, buffer areas and ecological connecting areas, medium levels of protection (sustainable agriculture, green connections and ecological corridors. The key aims of the project are as follows: transversality - repairing the agricultural fabric and the relationship between the land and the sea; sustainability - recovering the environmental system and traditional activities; flexibility - agriculture with only minor environmental impact.

  16. Range 8C Rehabilitation Demonstration Project, Hohenfels Training Area, Germany: Final report

    International Nuclear Information System (INIS)

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O.; Brent, J.J.

    1991-11-01

    More than 30 years of intensive and continual tactical training has caused extensive environmental damage at the US Army Hohenfels Training Area in Germany. The Range 8C Rehabilitation Demonstration Project, followed by a three-year monitoring effort, was conducted to develop and evaluate the environmental and economic effectiveness of seven revegetation and four erosion control prescriptions implemented at a 16-ha site. The point-intercept method was used to measure the types and amounts of vegetation established and the changes in the vegetative community during three years of military use on the seven areas treated with revegetation prescriptions. Field observations were made to determine the suitability and durability of four types of erosion control structures. Soil fertility and a source of seed appeared to be the most limiting factors in establishing vegetation, while seedbed preparation had only a minor influence. Grasses appeared to be more resistant to vehicle traffic than did other types of vegetation. Because grassed waterways were used as roads by military vehicles and a system of graded terraces was expensive, these erosion control prescriptions were unsuitable and uneconomical for use on training areas. Low-cost riprap waterbars and porous check dams slowed the velocity of runoff, trapped sediments, and were durable. Recommendations were formulated to improve the environmental and economic effectiveness of future rehabilitation efforts on tactical training areas

  17. Impacts of biogas projects on agro-ecosystem in rural areas-A case study of Gongcheng

    Institute of Scientific and Technical Information of China (English)

    Jin YANG; Weichao CHEN; Bin CHEN

    2011-01-01

    The rapid growth of agro-ecosystem has been the focus of "New Rural Construction" in China due to intensive energy consumption and environmental pollution in rural areas.As a kind of renewable energy,biogas is helpful for new energy development and plays an important role in the sustainable development of agroecosystem in China.To evaluate the effects of biogas on agro-ecosystem from a systematic angle,we discussed the status quo of household biogas and identified its main factors that may have impacts on agro-ecosystem.An indicator framework covering environmental,social and economic aspects was established to quantify the impacts exerted by biogas project on agro-ecosystem.A case study of Gongcheng was then conducted to evaluate the combined impact of biogas project using the proposed indicator framework.Results showed that there was a notable positive effect brought by the application of biogas,and the integrated benefit has been significantly improved by 60.36%,implying that biogas as a substitute energy source can promote the sustainable level of rural areas.

  18. A new bidirectional heteroassociative memory encompassing correlational, competitive and topological properties.

    Science.gov (United States)

    Chartier, Sylvain; Giguère, Gyslain; Langlois, Dominic

    2009-01-01

    In this paper, we present a new recurrent bidirectional model that encompasses correlational, competitive and topological model properties. The simultaneous use of many classes of network behaviors allows for the unsupervised learning/categorization of perceptual patterns (through input compression) and the concurrent encoding of proximities in a multidimensional space. All of these operations are achieved within a common learning operation, and using a single set of defining properties. It is shown that the model can learn categories by developing prototype representations strictly from exposition to specific exemplars. Moreover, because the model is recurrent, it can reconstruct perfect outputs from incomplete and noisy patterns. Empirical exploration of the model's properties and performance shows that its ability for adequate clustering stems from: (1) properly distributing connection weights, and (2) producing a weight space with a low dispersion level (or higher density). In addition, since the model uses a sparse representation (k-winners), the size of topological neighborhood can be fixed, and no longer requires a decrease through time as was the case with classic self-organizing feature maps. Since the model's learning and transmission parameters are independent from learning trials, the model can develop stable fixed points in a constrained topological architecture, while being flexible enough to learn novel patterns.

  19. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  20. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  1. Projecting water resources changes in potential large-scale agricultural investment areas of the Kafue River Basin in Zambia

    Science.gov (United States)

    Kim, Y.; Trainor, A. M.; Baker, T. J.

    2017-12-01

    Climate change impacts regional water availability through the spatial and temporal redistribution of available water resources. This study focuses on understanding possible response of water resources to climate change in regions where potentials for large-scale agricultural investments are planned in the upper and middle Kafue River Basin in Zambia. We used historical and projected precipitation and temperature to assess changes in water yield, using the Soil and Water Assessment Tool (SWAT) hydrological model. Some of the Coupled Model Intercomparison Project Phase 5 (CMIP5) climate model outputs for the Representative Concentration Pathway (RCP) 4.5 and 8.5 scenarios project a temperature warming range from 1.8 - 5.7 °C over the region from 2020 to 2095. Precipitation projection patterns vary monthly but tend toward drier dry seasons with a slight increase in precipitation during the rainy season as compared to the historical time series. The best five calibrated parameter sets generated for the historical record (1965 - 2005) were applied for two future periods, 2020 - 2060 and 2055 - 2095, to project water yield change. Simulations projected that the 90th percentile water yield would be exceeded across most of the study area by up to 800% under the medium-low (RCP4.5) CO2 emission scenario, whereas the high (RCP8.5) CO2 emission scenario resulted in a more spatially varied pattern mixed with increasing (up to 500%) and decreasing (up to -54%) trends. The 10th percentile water yield indicated spatially varied pattern across the basin, increasing by as much as 500% though decreasing in some areas by 66%, with the greatest decreases during the dry season under RCP8.5. Overall, available water resources in the study area are projected to trend toward increased floods (i.e. water yields far exceeding 90th percentile) as well as increasing drought (i.e. water yield far below 10th percentile) vulnerability. Because surface water is a primary source for agriculture

  2. Hydrogeochemical and stream sediment detailed geochemical survey for Thomas Range-Wasatch, Utah. Farmington Project area

    International Nuclear Information System (INIS)

    Butz, T.R.; Bard, C.S.; Witt, D.A.; Helgerson, R.N.; Grimes, J.G.; Pritz, P.M.

    1980-01-01

    Results of the Farmington project area of the Thomas Range-Wasatch detailed geochemical survey are reported. Field and laboratory data are presented for 71 groundwater samples, 345 stream sediment samples, and 178 radiometric readings. Statistical and areal distributions of uranium and possible uranium-related variables are given. A generalized geologic map of the project area is provided, and pertinent geologic factors which may be of significance in evaluating the potential for uranium mineralization are briefly discussed. Uranium concentrations in groundwater range from <0.20 to 21.77 ppB. The highest values are from groundwaters producing from areas in or near the Norwood Tuff and Wasatch, Evanston, and/or Echo Canyon Formations, and the Farmington Canyon Complex. The uranium:boron ratio delineates an anomalous trend associated with the Farmington Canyon Complex. Variables associated with uranium in groundwaters producing from the Norwood Tuff and Wasatch, Evanston, and/or Echo Canyon Formations include the uranium:sulfate ratio, boron, barium, potassium, lithium, silicon, chloride, selenium, and vanadium. Soluble uranium concentrations (U-FL) in stream sediments range from 0.99 to 86.41 ppM. Total uranium concentrations (U-NT) range from 1.60 to 92.40 ppM. Thorium concentrations range from <2 to 47 ppM. Anomalous concentrations of these variables are associated with the Farmington Canyon Complex. Variables which are associated with uranium include cerium, sodium, niobium, phosphorus, titanium, and yttrium

  3. Image applications for coastal resource planning: Elkhorn Slough Pilot Project

    Science.gov (United States)

    Kvitek, Rikk G.; Sharp, Gary D.; VanCoops, Jonathan; Fitzgerald, Michael

    1995-01-01

    The purpose of this project has been to evaluate the utility of digital spectral imagery at two levels of resolution for large scale, accurate, auto-classification of land cover along the Central California Coast. Although remote sensing technology offers obvious advantages over on-the-ground mapping, there are substantial trade-offs that must be made between resolving power and costs. Higher resolution images can theoretically be used to identify smaller habitat patches, but they usually require more scenes to cover a given area and processing these images is computationally intense requiring much more computer time and memory. Lower resolution images can cover much larger areas, are less costly to store, process, and manipulate, but due to their larger pixel size can lack the resolving power of the denser images. This lack of resolving power can be critical in regions such as the Central California Coast where important habitat change often occurs on a scale of 10 meters. Our approach has been to compare vegetation and habitat classification results from two aircraft-based spectral scenes covering the same study area but at different levels of resolution with a previously produced ground-truthed land cover base map of the area. Both of the spectral images used for this project were of significantly higher resolution than the satellite-based LandSat scenes used in the C-CAP program. The lower reaches of the Elkhorn Slough watershed was chosen as an ideal study site because it encompasses a suite of important vegetation types and habitat loss processes characteristic of the central coast region. Dramatic habitat alterations have and are occurring within the Elkhorn Slough drainage area, including erosion and sedimentation, land use conversion, wetland loss, and incremental loss due to development and encroachnnent by agriculture. Additonally, much attention has already been focused on the Elkhorn Slough due to its status as a National Marine Education and Research

  4. 75 FR 78988 - Post-2014 Resource Pool-Loveland Area Projects, Allocation Procedures and Call for Applications

    Science.gov (United States)

    2010-12-17

    ... Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), is publishing this... customers and for other appropriate purposes as determined by Western. These allocation procedures and call for applications, in conjunction with the Loveland Area Projects (LAP) Final Post-1989 Marketing Plan...

  5. Performance assessment and the safety case: Lessons from recent international projects and areas for further development

    International Nuclear Information System (INIS)

    Galson, Daniel A.; Bailey, Lucy

    2014-01-01

    The European Commission (EC) PAMINA project - Performance Assessment Methodologies in Application to Guide the Development of the Safety Case - was conducted over the period 2006-2009 and brought together 27 organisations from 10 countries. PAMINA had the aim of improving and developing a common understanding of performance assessment (PA) methodologies for disposal concepts for spent fuel and other long-lived radioactive wastes in a range of geological environments. This was followed by a Nuclear Energy Agency (NEA) sponsored project on Methods for Safety Assessment of Geological Disposal Facilities for Radioactive Waste (MeSA), which was completed in 2012. This paper presents a selection of conclusions from these projects, in the context of general understanding developed on what would constitute an acceptable safety case for a geological disposal facility, and outlines areas for further development. The paper also introduces a new project on PA that is under consideration within the context of the EC Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP). (authors)

  6. Surface radiological investigation of Trench 5 in Waste Area Grouping 7 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Goff, D.D.

    1991-08-01

    A surface radiological investigation of areas encompassing Trench 5 on the Oak Ridge Reservation (ORR) was conducted from May 1990 through November 1990. This survey was led by the author, assisted by various members of the Measurement Applications and Development (MAD) group of the Health and Safety Research Division (HASRD) of Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The purpose of the investigation was to determine the presence, nature, and extent of surface radiological contamination at Trench 5, the Homogeneous Reactor Experiment fuel wells, and surrounding areas. Based on the data obtained in the field, interim corrective measures were recommended to limit human exposure to radioactivity and to minimize insult to the environment. It should be stressed that this project was not intended to be a complete site characterization but rather to be a preliminary investigation into the potential contamination problem that might exist as a result of past operations at Trench 5

  7. The Impact an Oratory Project generates to Primary School Students who live in Rural Areas of Cartago

    Directory of Open Access Journals (Sweden)

    María Gabriela Amador-Solano

    2014-03-01

    Full Text Available This article aims at showing the development and relevance of an extension project in seven rural schools located in “circuito 05” in the central area of Cartago. The main goal is to enhance oral commu­nication in elementary school students. The project was designed as a training workshop for the teach­ers in the chosen schools in order to be taught to students by implementing an oratory club. In each student´s dissertation, the researchers observed the enthusiasm that the project caused in the schools. Objectives, contents, activities, assessment and observations were designed in a didactic plan to be used upon needs of institutions.

  8. The COMPOSE Project

    Science.gov (United States)

    Balletta, P.; Biagini, M.; Gallinaro, G.; Vernucci, A.

    2003-07-01

    This paper provides an overview of the on-going project COMPOSE, an EC co-funded project aiming to define, specify and validate an innovative mobile-services scenario in support of travellers, and to demonstrate the effectiveness of the new proposed location-based value-added services. COMPOSE is supported by organisations belonging to numerous categories covering, as a whole, the entire value-chain of infomobility services provision to the final user. The project team comprises, in addition to the affiliations of the authors, also Teleatlas (NL), ARS T&TT (NL), Alcatel-Bell Space (B), Skysoft (P), Hitech Marketing (A) and MobileGis (IR). The paper describes the services that will be offered to users, encompassing both the pre-trip and the on-trip framework, presents the overall hybrid system architecture also including a via-satellite component based upon the Wideband-CDMA (W-CDMA) technique adopted in UMTS, discusses the access solutions envisaged for that component permitting multiple feeder-link stations to share the CDMA multiplex capacity by directly transmitting their codes to the satellite, and illustrates the results of some computer simulations intended to assess the performance of said access solutions, with regard to the effects of the inevitable up- link frequency errors and transponder non-linearity.

  9. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  10. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  11. Distribution of projected area factors exhibited by occupants of a tertiary institutional building in the hot-humid tropics for thermal comfort evaluation

    International Nuclear Information System (INIS)

    Ijhar Hidayat Rusli; Nor Mariah Adam; Nawal Aswan Abdul Jalil

    2009-01-01

    Full text: One of the factors that affect the thermal comfort levels of occupants of a built environment is the amount of heat exchange they engage in with the short-wave radiation originating from the sun. In quantifying this phenomenon, it is necessary to determine the projected area factors between an occupant and the geometrical location of the sun. This paper presents the projected area factors of an occupant of a tertiary institutional building exposed to short-wave radiation from the sun at different hours of a day throughout a year. It is seen that, for the current case studied, the months June and July show the highest projected area factors among all 12 months. This suggests that it is within these months that the interaction between an occupant and the radiant heat from the sun is greatest. An example of how the projected area factors can be used in thermal comfort evaluation is also presented incorporating actual measured irradiance values over a period of time. Such analysis and the information it provides allows for a more detailed investigation of the thermal comfort levels of a built environment in relation to fenestration design and can be coupled with day lighting analysis in virtue of a sustainable built environment. (author)

  12. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  13. The Role of Project Science in the Chandra X-Ray Observatory

    Science.gov (United States)

    O'Dell, Stephen L.; Weisskopf, Martin C.

    2006-01-01

    The Chandra X-Ray Observatory, one of NASA's Great Observatories, has an outstanding record of scientific and technical success. This success results from the efforts of a team comprising NASA, its contractors, the Smithsonian Astrophysical Observatory, the instrument groups, and other elements of the scientific community, including thousands of scientists who utilize this powerful facility for astrophysical research. We discuss the role of NASA Project Science in the formulation, development, calibration, and operation of the Chandra X-ray Observatory. In addition to representing the scientific community within the Project, Project Science performed what we term "science systems engineering". This activity encompasses translation of science requirements into technical requirements and assessment of the scientific impact of programmatic and technical trades. We briefly describe several examples of science systems engineering conducted by Chandra Project Science.

  14. Project-service Solutions in the Yacht Industry: a Value-Chain Analysis

    Directory of Open Access Journals (Sweden)

    Davide Aloini

    2013-10-01

    economic trend, in particular throughout the delivery of integrated project-service solutions in all project life cycle stages. Innovative value offerings encompass a complex network of suppliers and subcontractors that is not stable and is arranged in a sporadic and unpredictable manner. Multiple case studies in the yacht industry were conducted to explore the configuration of project-service solutions. The research constitutes an original contribution to studies on servitization adoption in an industrial project context from an inter-organizational perspective. It emerged that SMEs reorganize themselves, in order to provide flexible on-demand solutions to customers, by including all the capabilities within their network. Newly arising professional roles are oriented to the implementation of smart networks and are focused on service infusion in order to provide increased customer value.

  15. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  16. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    International Nuclear Information System (INIS)

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  17. Using Sales Management Students to Manage Professional Selling Students in an Innovative Active Learning Project

    Science.gov (United States)

    Young, Joyce A.; Hawes, Jon M.

    2013-01-01

    This paper describes an application of active learning within two different courses: professional selling and sales management. Students assumed the roles of sales representatives and sales managers for an actual fund-raiser--a golf outing--sponsored by a student chapter of the American Marketing Association. The sales project encompassed an…

  18. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  19. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Uganda

    International Nuclear Information System (INIS)

    1985-01-01

    A full report has been compiled describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Uganda. The Mission suggest that the speculative uranium resources of the country could be within the very wide range of 0 to 105 000 tonnes of uranium metal. The Mission finds that most of these speculative resources are related to Proterozoic unconformities and to Cenozoic sandstones of the Western Rift Valley. Some potential is also associated with Post-tectonic granites. The Mission recommends to rehabilitate the Geological Survey of Uganda in order to enable it to conduct and support a uranium exploration programme for unconformity related and for standstone hosted uranium deposits. Recommended exploration methods encompass geological mapping and compilation, an airborne gamma-ray spectrometer survey north of 1 deg. North latitude, stream sediment sampling, and ground scintillometric surveys in favourable areas. Follow up work should include VLF-EM surveys, emanometry and drilling. (author)

  20. Life Support Systems: Oxygen Generation and Recovery

    Data.gov (United States)

    National Aeronautics and Space Administration — The Advanced Exploration Systems (AES) Life Support Systems project Oxygen Generation and Recovery technology development area encompasses several sub-tasks in an...

  1. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of... one or more phases, dependent on one or more power sale contracts. The proposed wind park would... that limit construction vehicle speed limits. Foresight indicated that the wind park contractor will...

  2. The ORNL Basemapping and Imagery Project: Data collection, processing and dissemination

    International Nuclear Information System (INIS)

    Tuttle, M.; Pace, P.

    1996-01-01

    Over the past three years, the GIS and Computer Modeling (GCM) Group at Oak Ridge National Laboratory (ORNL), has been engaged in creating a very comprehensive geospatial data base for Department of Energy (DOE) installations managed by the DOE Oak Ridge Operations Office (DOE-ORO). This effort encompasses topographic, planimetric, land use/land cover, flood plain, digital elevation, and digital imagery data for the Oak Ridge Reservation (ORR) and surrounding areas. The ORR covers approximately 34,800 acres and includes ORNL, the K-25 Site and the Y-12 Plant. The geographic extent of the Base Mapping and Imagery Project covers the ORR and surrounding area and two other DOE plants (Portsmouth, Ohio and Paducah, Kentucky) for a total of 166,000 acres. The resulting data represent a major improvement in the spatial accuracy and currency of data which are used as a foundation for environmental restoration, facility studies, and other GIS data applications. A GIS data server was also created in order to store and disseminate the new basemapping data. This paper describes the history of the Base Mapping and Imagery Project with emphasis on the logistical aspects of data quality assessment. data tracking, and data product work flow for a large comprehensive spatial data base. The paper then describes the evolution of the GIS data server including its design from an FTP server to a NetScape-based World Wide Web interface. This combination of data and data access provides the ORR environmental community with a carefully configured and managed GIS dataset

  3. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  4. Impacts of biogas projects on agro-ecosystem in rural areas — A case study of Gongcheng

    Science.gov (United States)

    Yang, Jin; Chen, Weichao; Chen, Bin

    2011-09-01

    The rapid growth of agro-ecosystem has been the focus of "New Rural Construction" in China due to intensive energy consumption and environmental pollution in rural areas. As a kind of renewable energy, biogas is helpful for new energy development and plays an important role in the sustainable development of agro-ecosystem in China. To evaluate the effects of biogas on agro-ecosystem from a systematic angle, we discussed the status quo of household biogas and identified its main factors that may have impacts on agro-ecosystem. An indicator framework covering environmental, social and economic aspects was established to quantify the impacts exerted by biogas project on agro-ecosystem. A case study of Gongcheng was then conducted to evaluate the combined impact of biogas project using the proposed indicator framework. Results showed that there was a notable positive effect brought by the application of biogas, and the integrated benefit has been significantly improved by 60.36%, implying that biogas as a substitute energy source can promote the sustainable level of rural areas.

  5. Report on draft Area Recommendation Report for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The draft Area Recommendation Report for the Crystalline Repository Project (ARR) is one product which is part and parcel of a process which was established by Congress and implemented by the Department of Energy. Congress, by enacting the Nuclear Waste Policy Act of 1982 (NWPA), Published Law 97-425, 96 stat 2201, 42 USC 10101, directed the Department of Energy to establish a national program which would provide for the development of repositories for the disposal of high-level radioactive waste and spent nuclear fuel, The NWPA requires, among other things, that affected Tribes and States be provided the opportunity to participate fully in the development of proposed repositories. The Fond du Lac Tribe is an affected tribe whose proprietary interests will be impacted by the Crystalline Repository Project as identified in the draft ARR. The draft ARR does not meet the obligations of the NWPA, the Treaties of 1837 and 1842 or the Trust Responsibility to Indian Tribes. The NWPA required participation by affected tribes, of which the Fond du Lac Band of Lake Superior Chippewa is included. This exclusion has placed in question the validity of the initial CRP process and does not adequately protect the interest of the Fond du Lac Band. Further study is required to fully appreciate the total affect that the Fond du Lac Bands interest may have on this report

  6. PANeGOV : Understanding Democratic eGovernance in Asia | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    As such, this research project is focussed on ICTs and "governance", which encompasses, but is not limited to, "e-government" services. PANeGOV will undertake 8 projects classified in three areas. All are research activities - intellectual investigations aimed at discovering, interpreting, revising and deepening our collective ...

  7. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  8. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    International Nuclear Information System (INIS)

    LUECK, K.J.

    2004-01-01

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, and summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation

  9. Hydrogeochemical and stream sediment detailed geochemical survey for Thomas Range-Wasatch, Utah. Cottonwood project area

    International Nuclear Information System (INIS)

    Butz, T.R.; Bard, C.S.; Witt, D.A.; Helgerson, R.N.; Grimes, J.G.; Pritz, P.M.

    1980-01-01

    Results of Cottonwood project area of the Thomas Range-Wasatch detailed geochemical survey are reported. Field and laboratory data are presented for 15 groundwater samples, 79 stream sediment samples, and 85 radiometric readings. Statistical and areal distributions of uranium and possible uranium-related variables are given. A generalized geologic map of the project area is provided, and pertinent geologic factors which may be of significance in evaluating the potential for uranium mineralization are briefly discussed. Uranium concentrations in groundwater range from 0.25 to 3.89 ppB. The highest concentrations are from groundwaters from the Little Cottonwood and Ferguson Stocks. Variables that appear to be associated with uranium in groundwater include cobalt, iron, potassium, manganese, nickel, sulfate, and to a lesser extent, molybdenum and strontium. This association is attributed to the Monzonitic Little Cottonwood Stock, granodioritic to granitic and lamprophyric dikes, and known sulfide deposits. Soluble uranium concentrations (U-FL) in stream sediments range from 0.31 to 72.64 ppM. Total uranium concentrations (U-NT) range from 1.80 to 75.20 ppM. Thorium concentrations range from <2 to 48 ppM. Anomalous values for uranium and thorium are concentrated within the area of outcrop of the Little Cottonwood and Ferguson Stocks. Variables which are areally associated with high values of uranium, thorium, and the U-FL:U-NT ratio within the Little Cottonwood Stock are barium, copper, molybdenum, and zinc. High concentrations of these variables are located near sulfide deposits within the Little Cottonwood Stock

  10. The ARIPAR project: analysis of the major accident risks connected with industrial and transportation activities in the Ravenna area

    International Nuclear Information System (INIS)

    Egidi, Demetrio; Foraboschi, Franco P.; Spadoni, Gigliola; Amendola, Aniello

    1995-01-01

    The paper describes the ARIPAR project aimed at the assessment of the major accident risks connected with storage, process and transportation of dangerous substances in the densely populated Ravenna area in Italy, which includes a large complex of chemical and petrochemical plants and minor industries, essentially distributed around an important commercial port. Large quantities of dangerous goods are involved in various transportation forms connected with the industrial and commercial activity of the port. The project started by making a complete inventory of fixed installations and transportation activities capable of provoking major fire, explosion and toxic release events; then relevant accident scenarios were developed for the single hazard sources; probabilities were assigned to the events and consequences were evaluated; finally iso-risk contours and F-N diagrams were evaluated both for the single sources and for the overall area. This required the development of a particular methodology for analysis of area risk and of associated software packages which allowed examination of the relative importance of the different activities and typologies of materials involved. The methodological approach and the results have proved to be very useful for the priority-ranking of risk mitigating interventions and physical planning in a complex area

  11. Identification of the first PAR1 deletion encompassing upstream SHOX enhancers in a family with idiopathic short stature.

    Science.gov (United States)

    Benito-Sanz, Sara; Aza-Carmona, Miriam; Rodríguez-Estevez, Amaya; Rica-Etxebarria, Ixaso; Gracia, Ricardo; Campos-Barros, Angel; Heath, Karen E

    2012-01-01

    Short stature homeobox-containing gene, MIM 312865 (SHOX) is located within the pseudoautosomal region 1 (PAR1) of the sex chromosomes. Mutations in SHOX or its downstream transcriptional regulatory elements represent the underlying molecular defect in ~60% of Léri-Weill dyschondrosteosis (LWD) and ~5-15% of idiopathic short stature (ISS) patients. Recently, three novel enhancer elements have been identified upstream of SHOX but to date, no PAR1 deletions upstream of SHOX have been observed that only encompass these enhancers in LWD or ISS patients. We set out to search for genetic alterations of the upstream SHOX regulatory elements in 63 LWD and 100 ISS patients with no known alteration in SHOX or the downstream enhancer regions using a specifically designed MLPA assay, which covers the PAR1 upstream of SHOX. An upstream SHOX deletion was identified in an ISS proband and her affected father. The deletion was confirmed and delimited by array-CGH, to extend ~286 kb. The deletion included two of the upstream SHOX enhancers without affecting SHOX. The 13.3-year-old proband had proportionate short stature with normal GH and IGF-I levels. In conclusion, we have identified the first PAR1 deletion encompassing only the upstream SHOX transcription regulatory elements in a family with ISS. The loss of these elements may result in SHOX haploinsufficiency because of decreased SHOX transcription. Therefore, this upstream region should be included in the routine analysis of PAR1 in patients with LWD, LMD and ISS.

  12. Metrics, models and foresight for European sustainable food and nutrition security: the vision of the SUSFANS project

    NARCIS (Netherlands)

    Rutten, M.M.; Achterbosch, T.J.; Boer, de I.J.M.; Cuaresma, Jesus Crespo; Geleijnse, J.M.; Havlik, P.; Heckelei, T.; Ingram, John; Leip, Adrian; Marette, Stephan; Meijl, van J.C.M.; Soler, L.G.; Swinnen, J.; Veer, van 't P.; Vervoort, J.M.; Zimmermann, A.; Zimmermann, K.L.; Zurek, M.

    2018-01-01

    This paper defines the research agenda of the SUSFANS project, describes its history and its potential societal impacts. It contributes to balanced and encompassing views on how to strengthen food and nutrition security outcomes in the EU and how to improve the performance of the food system in the

  13. ARCHER Project: Progress on Material and component activities for the Advanced High Temperature Reactor

    International Nuclear Information System (INIS)

    Buckthorpe, D.E.

    2014-01-01

    The ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) integrated project is a four year project which was started in 2011 as part of the European Commission 7th Framework Programme (FP7) to perform High Temperature Reactor technology R&D in support of reactor demonstration. The project consortium encompasses conventional and Nuclear Industry, Utilities, Technical Support Organizations, Research & Development Organizations and Academia. The activities involved contribute to the Generation IV (GIF) International Forum and collaborate with related projects in the US, China, Japan, and the Republic of Korea in cooperation with IAEA and ISTC. This paper addresses the progress of the work on ARCHER materials and component activities since the start of the project and underlines some of the main conclusions reached. (author)

  14. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  15. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  16. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  17. Clinical aspects of the Mayo/IBM PACS project

    Science.gov (United States)

    Forbes, Glenn S.; Morin, Richard L.; Pavlicek, William

    1991-07-01

    A joint project between Mayo Clinic and IBM to develop a picture archival and communications system has been under development for three years. This project began as a potential solution to a pressing archival problem in magnetic resonance imaging. The project has grown to encompass a much larger sphere of activity including workstations, image retrieval, and report archival. This report focuses on the clinical aspects involved in the design, development, and implementation of such a system. In particular, emphasis is placed on the clinical impact of the system both inside and outside of the radiology department. The primary concerns have centered on fidelity of archival data, ease of use, and diagnostic efficacy. The project to date has been limited to neuroradiology practice. This group consists of nine staff radiologists and fellows. Administrative policy decisions regarding the accessibility and available of digital data in the clinical environment have been much more difficult and complex than originally conceived. Based on the observations thus far, the authors believe the system will become a useful and valuable adjunct to clinical practice of radiology.

  18. ARC Research Areas and Projects

    Science.gov (United States)

    studying realistic engine-in-vehicle operation, thermal management, component matching, advanced powertrain maximize the vehicle's performance. The vision of Thrust Area 1 is to create adaptive vehicles for maximum , victor.j.paul2.civ@mail.mil The safety and performance of human occupants and operators are paramount in the

  19. THE CONTEXT OF ESTABLISHING PROJECT MANAGEMENT OFFICES IN THE IT AREA: TWO CASE STUDIES

    Directory of Open Access Journals (Sweden)

    Andrea Giovanni Spelta

    2010-01-01

    Full Text Available Completing strategic Information Technology (IT projects as planned is certainly an important objective for large firms. One of the measures adopted to reach this goal systematically is to create a Project Management Office in the IT area (PMO-IT. However, many firms consider the possibility of creating a PMO-IT, but decide not to do it. This paper presents the results of an exploratory research about the contextual drivers that determine the decision to create PMO-Its. Through two case studies of large Brazilian firms – one that created the entity and another which believes does not need it –, the drivers of the decision to create or not to create a PMO-IT were identified, and it was possible to confirm some of the drivers mentioned in the literature. This paper increases the undertstanding about this topic, which is important in the Management Information Systems field, as well as indicates paths for future research.

  20. Draft environmental assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  1. 76 FR 8359 - Boulder Canyon Project

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Western Area Power Administration (Western) is proposing an adjustment to the Boulder Canyon Project (BCP... Reclamation Project Act of 1939 (43 U.S.C. 485h(c)), and other acts that specifically apply to the project...

  2. Protecting information on local area networks

    CERN Document Server

    Schweitzer, James A

    1988-01-01

    Protecting Information on Local Area Networks presents the various types of networks and explains why they are being expanded at such a rapid pace. This book considers how management can gain control of the valuable network-services information resources generally available.Organized into three parts encompassing seven chapters, this book begins with an overview of the various networks and their operations. This text then discusses the appropriate management actions to ensure some control over the use of networks and the business information resource. Other chapters consider the management rat

  3. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    1979-08-01

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  4. REDD+ projects in the Democratic Republic of Congo: impacts on future emissions, income and biodiversity

    Science.gov (United States)

    Mosnier, Aline; Bocqueho, Geraldine; Mant, Rebecca; Obersteiner, Michael; Havlik, Petr; Kapos, Val; Fritz, Steffen; Botrill, Leo

    2014-05-01

    The Democratic Republic of Congo (DRC) encompasses a large rainforest area which has been rather preserved up to now. However, pressure on the forests is increasing with high population growth, transition toward political stability and the abundance of minerals in the country. REDD+ is a developing mechanism under the UNFCCC that aims to support developing countries that want to make efforts to reduce their emissions from deforestation and forest degradation. The REDD+ strategy in DRC combines an independent national fund and independent REDD+ projects at the local level that are at the initial stage of implementation. The objective of this paper is to assess i) emissions reduction due to the implementation of the REDD+ pilot projects taking into account potential leakage and ii) potential co-benefits of REDD+ pilot projects in terms of biodiversity and rural income by 2030. We use the land use economic model CongoBIOM adapted from GLOBIOM which represents land-based activities and land use changes at a 50x50km resolution level. It includes domestic and international demand for agricultural products, fuel wood and minerals which are the main deforestation drivers in the Congo Basin region. Finally, we run a sensitivity analysis on emissions from land use change according to three different above and below ground living biomass estimates: downscaled FAO, NASA and WHRC.

  5. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  6. TWENTIES Project. Wind power for wide-area control of the grid

    Energy Technology Data Exchange (ETDEWEB)

    Perez, Juan Carlos; Combarros, Clara; Veguillas, Roberto; Hermosa, Mikel Joseba [Iberdrola Renovables, Madrid (Spain); Rubio, David [Iberdrola Ingenieria y Construccion (Spain); Egido, Ignacio [Comillas Univ. (ES). Inst. de Investigacion Tecnologica (IIT)

    2011-07-01

    Europe faces a great challenge with the 2020 scenario in which the renewable energy installed capacity in Europe should increase from its present value of approximately 80 GW to 230 GW in 2020. The future high penetration levels of wind and other renewable energies in the power system require decision makers and stakeholders of the electrical sector to work together to develop new ancillary services and to make the necessary changes to the grid infrastructure in Europe. This background is in line with the SYSERWIND demonstration lead by Iberdrola Renovables and included in the TWENTIES project, with three more partners taking part in this package: Red Electrica de Espana (REE), IIT and Gamesa Eolica. This paper introduces a first phase of preliminary work to define, install and test a Secondary Frequency Control and a Voltage Management System in a wide area, along a transport line. (orig.)

  7. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  8. Integrated chemical and biological assessment of contaminant impacts in selected European coastal and offshore marine areas

    NARCIS (Netherlands)

    Hylland, Ketil; Robinson, Craig D.; Burgeot, Thierry; Martínez-Gómez, Concepción; Lang, Thomas; Svavarsson, Jörundur; Thain, John E.; Vethaak, A. Dick; Gubbins, Mattew J.

    This paper reports a full assessment of results from ICON, an international workshop on marine integrated contaminant monitoring, encompassing different matrices (sediment, fish, mussels, gastropods), areas (Iceland, North Sea, Baltic, Wadden Sea, Seine estuary and the western Mediterranean) and

  9. Measurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF project

    Energy Technology Data Exchange (ETDEWEB)

    Menut, L; Vautard, R; Flamant, P H [Centre National de Recherche Scientifique (CNRS), 75 - Paris (France). Lab. de Meteorologie Dynamique; Flamant, C; Beekmann, M; Megie, G; Sicard, M [Centre National de la Recherche Scientifique (CNRS), 91 - Verrieres-le-Buisson (France). Service d' Aeronomie; Abonnel, C; Lefebvre, M P; Lossec, B [Meteo-France, 75 - Paris (France); Chazette, P; Martin, D [CNRS (France). Lab. des Sciences du Climat et de l' Environnement; Gombert, D [AIRPARIF, Paris (France); Guedalia, D [CNRS-Universite Paul Sabatier (France). Lab. d' Aerologie; Kley, D [Forschungszentrum Juelich GmbH (Germany); Perros, P; Toupance, G [CNRS (France). Lab. Interuniversitaire des Systemes Atmospheriques

    2000-11-01

    The ''etude et simulation de la qualite de l'air en ile de France'' (ESQUIF) project is the first integrated project dedicated to the study of the processes leading to air pollution events over the Paris area. The project was carried out over two years (summer 1998 to winter 2000) to document all types of meteorological conditions favourable to air quality degradation, and in particular to photo oxydant formation. The goals of ESQUIF are (1) to improve our understanding of the relevant chemical and dynamical processes and, in turn, improve their parametrizations in numerical models, and (2) to improve and validate existing models dedicated to pollution analysis, scenarios and/or forecasting, by establishing a comprehensive and thorough database. We present the rationale of the ESQUIF project and we describe the experimental set-up. We also report on the first experiments which took place during the summer of 1998 involving surface networks, and remote sensing instruments as well as several aircraft. Focusing on three days of August 1998, the relative contributions of long-range transported and locally-produced ozone to the elevated ozone concentrations observed during this period are discussed and chemistry-transport model preliminary results on this period are compared to measurements. (orig.)

  10. Analysis of an Interactive Technology Supported Problem-Based Learning STEM Project Using Selected Learning Sciences Interest Areas (SLSIA)

    Science.gov (United States)

    Kumar, David Devraj

    2017-01-01

    This paper reports an analysis of an interactive technology-supported, problem-based learning (PBL) project in science, technology, engineering and mathematics (STEM) from a Learning Sciences perspective using the Selected Learning Sciences Interest Areas (SLSIA). The SLSIA was adapted from the "What kinds of topics do ISLS [International…

  11. Nuclear propulsion technology development - A joint NASA/Department of Energy project

    Science.gov (United States)

    Clark, John S.

    1992-01-01

    NASA-Lewis has undertaken the conceptual development of spacecraft nuclear propulsion systems with DOE support, in order to establish the bases for Space Exploration Initiative lunar and Mars missions. This conceptual evolution project encompasses nuclear thermal propulsion (NTP) and nuclear electric propulsion (NEP) systems. A technology base exists for NTP in the NERVA program files; more fundamental development efforts are entailed in the case of NEP, but this option is noted to offer greater advantages in the long term.

  12. Large-area soft x-ray projection lithography using multilayer mirrors structured by RIE

    Science.gov (United States)

    Rahn, Steffen; Kloidt, Andreas; Kleineberg, Ulf; Schmiedeskamp, Bernt; Kadel, Klaus; Schomburg, Werner K.; Hormes, F. J.; Heinzmann, Ulrich

    1993-01-01

    SXPL (soft X-ray projection lithography) is one of the most promising applications of X-ray reflecting optics using multilayer mirrors. Within our collaboration, such multilayer mirrors were fabricated, characterized, laterally structured and then used as reflection masks in a projecting lithography procedure. Mo/Si-multilayer mirrors were produced by electron beam evaporation in UHV under thermal treatment with an in-situ X-ray controlled thickness in the region of 2d equals 14 nm. The reflectivities measured at normal incidence reached up to 54%. Various surface analysis techniques have been applied in order to characterize and optimize the X-ray mirrors. The multilayers were patterned by reactive ion etching (RIE) with CF(subscript 4), using a photoresist as the etch mask, thus producing X-ray reflection masks. The masks were tested in the synchrotron radiation laboratory of the electron accelerator ELSA at the Physikalisches Institut of Bonn University. A double crystal X-ray monochromator was modified so as to allow about 0.5 cm(superscript 2) of the reflection mask to be illuminated by white synchrotron radiation. The reflected patterns were projected (with an energy of 100 eV) onto the resist (Hoechst AZ PF 514), which was mounted at an average distance of about 7 mm. In the first test-experiments, structure sizes down to 8 micrometers were nicely reproduced over the whole of the exposed area. Smaller structures were distorted by Fresnel-diffraction. The theoretically calculated diffraction images agree very well with the observed images.

  13. Regional Hydrology of the Green River-Moab Area, Northwestern Paradox Basin, Utah

    OpenAIRE

    United States Geological Survey

    1982-01-01

    The Green River-Moab area encompasses about 7,800 square kilometers or about 25 percent of the Paradox basin. The entire Paradox basin is a part of the Colorado Plateaus that is underlain by a thick sequence of evaporite (salt) beds of Pennsylvanian age. The rock units that underlie the area have been grouped into hydrogeologic units based on their water-transmitting ability. Confining beds consist of evaporite beds of mostly salt, and overlying and underlying thick sequences of rocks with...

  14. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  15. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  16. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  17. 78 FR 48670 - Boulder Canyon Project

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... INFORMATION: Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits...

  18. 77 FR 48151 - Boulder Canyon Project

    Science.gov (United States)

    2012-08-13

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... INFORMATION: Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits...

  19. 76 FR 56430 - Boulder Canyon Project

    Science.gov (United States)

    2011-09-13

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Project (BCP) electric service provided by the Western Area Power Administration (Western). The Rates will... by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits on the Colorado River...

  20. Impact of a decommissioning project on the site area, the federal state, and their economic development

    International Nuclear Information System (INIS)

    Spies, B.G.; Butt, G.M.

    1996-01-01

    Greifswald-Lubmin is a site situated in a border region of Germany, but in the center of eastern Europe and the Baltic countries. The chances of the area are a high vocational qualification of the population and the economic potential opened up by the planned decommissioning of the Greifswald nuclear power plant. A decisive factor for the region's future is to interlace the decommissioning and dismantling activities on site with suitable action taken in support of improvement of the infrastructure and the economic life of the region, as a joint effort of local decision-taking bodies and authorities as well as the Land government. Commitment of private firms from Germany and abroad in the project management and performance of project tasks can contribute valuable stimulation and support. (orig.)

  1. RESEARCH AND PRACTICE OF UAV REMOTE SENSING IN THE MONITORING AND MANAGEMENT OF CONSTRUCTION PROJECTS IN RIPARIAN AREAS

    Directory of Open Access Journals (Sweden)

    J. Yu

    2018-04-01

    Full Text Available The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects’ monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  2. Cultural respect encompassing simulation training: being heard about health through broadband

    Directory of Open Access Journals (Sweden)

    Phyllis Min-yu Lau

    2016-04-01

    Full Text Available Background. Cultural Respect Encompassing Simulation Training (CREST is a learning program that uses simulation to provide health professional students and practitioners with strategies to communicate sensitively with culturally and linguistically diverse (CALD patients. It consists of training modules with a cultural competency evaluation framework and CALD simulated patients to interact with trainees in immersive simulation scenarios. The aim of this study was to test the feasibility of expanding the delivery of CREST to rural Australia using live video streaming; and to investigate the fidelity of cultural sensitivity – defined within the process of cultural competency which includes awareness, knowledge, skills, encounters and desire – of the streamed simulations. Design and Methods. In this mixed-methods evaluative study, health professional trainees were recruited at three rural academic campuses and one rural hospital to pilot CREST sessions via live video streaming and simulation from the city campus in 2014. Cultural competency, teaching and learning evaluations were conducted. Results. Forty-five participants rated 26 reliable items before and after each session and reported statistically significant improvement in 4 of 5 cultural competency domains, particularly in cultural skills (P<0.05. Qualitative data indicated an overall acknowledgement amongst participants of the importance of communication training and the quality of the simulation training provided remotely by CREST. Conclusions. Cultural sensitivity education using live video-streaming and simulation can contribute to health professionals’ learning and is effective in improving cultural competency. CREST has the potential to be embedded within health professional curricula across Australian universities to address issues of health inequalities arising from a lack of cultural sensitivity training.

  3. Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, OH

    Energy Technology Data Exchange (ETDEWEB)

    Hooten, Gwendolyn [Dept. of Energy (DOE), Legacy Management; Hertel, Bill [Navarro Research and Engineering; Homer, John [Navarro Research and Engineering

    2016-03-01

    The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km2 (16 mi2), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the “Pit 3 Swale,” an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014

  4. The cross-border project between France and Italy MARS+. Sub-project - Innovative technologies for the mechanization of the areas hard to reach

    Directory of Open Access Journals (Sweden)

    G. Tirrò

    2013-09-01

    Full Text Available The care and protection of the mountain areas and their traditional crops were some of the reasons that led regional governments of Liguria and Tuscany to participate in the strategic project “Sea, Countryside and Land: potentiate the strategic unitarily” (MARS +. This project has also involved the participation of the four cross-border regions: Tuscany (leader, Sardinia, Liguria and Corsica. The aim was to promote the development of the innovations and entrepreneurship in the rural areas in order to increase competitiveness. In particular, the subproject SC has provided the transfer of innovations to facilitate the processes of mechanization in vineyards and olive orchards in contexts defined as “heroic”, areas of high landscape and environmental value in which the typical cultures has been always carried out, generally, on terraces or slopes. These conditions require a great effort by the farmers and result in high production costs. The transfer of the innovations has provided the organization of demonstration days in which the technological solutions for the management of the farming operations in vineyards and olive orchards were proposed and tested. During these events, the participative process was fundamentally reconfirmed, not only as a means to expand the knowledge of innovative products, but also as an opportunity for farmers, retailers, manufacturers, researchers, and local administrators to interact and facilitate the development of other technologies. The parameters that led to the innovative solutions included: the small size, user-friendliness, agility, and the ability of operating on systems not easily accessible. These products must also ensure the ergonomics and safety of workers performing all the growing operations. A thorough research of the available technologies and prototypes, still under development, affirms the presence of many innovations. These innovations not only allow the execution of all the field

  5. Biogas in Burkina Faso. Influential factors of biogas projects in rural areas of Burkina Faso

    Energy Technology Data Exchange (ETDEWEB)

    Aschaber, Andreas

    2010-07-01

    Full text: Burkina Faso is among the poorest countries in the world. The energy situation in Burkina Faso is among the most critical issues which need to be addressed in the country. The electrical power grid is insufficient and only available in urban centers. Consequently wood and charcoal is used in order to meet the basic needs for heating, cooking, and lightning by the majority of the population. The resulting overuse of natural energy resources in Burkina Faso has been causing massive deforestation and desertification on the one hand and on the other hand scarcity in fuel wood availability. According to a recent feasibility study of the GTZ, biogas is thought to be one of the most sustainable solutions for developing energy self sufficiency in rural areas of Burkina Faso. Biogas is not a new concept in Burkina Faso, as the first biogas plants were already installed in the 70's. Recently a national biogas program and the activity of various NGOs lead to a rejuvenation of attempts to establish biogas in Burkina Faso. Although biogas has a long history in Burkina Faso, no significant breakthrough of this technology has happened so far. None of the biogas plants built during the last 40 years have been operational for a long time. This contribution presents a study aimed to analyze the partial success and failures of the attempts to install biogas plants so far. The study was conducted in May 2009 as part of a project for a model application of the technology in the frame of University cooperation between Austria (University of Innsbruck) and Burkina Faso (Universite Polytechnique du Bobo Dioulasso). During the field study four sites of existing biogas plants were visited, five interviews with experts conducted and two focus groups with potential users in a rural setting were conducted. The systemic approach, including technical as well as socioeconomic aspects, yielded a wealth of factors which can potentially influence the success of biogas projects in

  6. The application and practical benefits of “C theory” in project management

    Directory of Open Access Journals (Sweden)

    Kao I-Chan

    2017-01-01

    Full Text Available This study regarded adult in-service students who are familiar with project management courses as the subjects and collected data through questionnaires for confirmatory factor analysis and reliability analysis. The aim is to construct a “C Theory” questionnaire scale that encompasses the essence of Chinese management philosophy like decision-making of Taoism, leadership of Legalism, tactics of School of Military Strategists, creativity of Mohism, and coordination of Confucianism. Furthermore, management performance scales were constructed for learning and growth, internal operation, customer satisfaction, and financial control, while the questionnaires and statistical analyses were expected to probe into the impact of “C Theory” on project management performance. This study found that the application and practice of “C Theory” have a high and positive correlation with project management and a significant influence on the improvement of performance. It is therefore suggested that management methods in “C Theory” be appropriately used in project management in order to enhance the efficiency of project management and facilitate the achievement of project management targets.

  7. [Evaluation of the socioeconomic status in epidemiological surveys: hypotheses of research in the Brianza area MONICA project].

    Science.gov (United States)

    Cesana, G C; Ferrario, M; De Vito, G; Sega, R; Grieco, A

    1995-01-01

    Socio-economic status (SES) has been reported as a causative factor of increasing health inequalities in industrialized countries. The phenomenon has been particularly investigated for job related diseases, including cardiovascular disease and risk. The group of occupational medicine specialists in the world wide MONItoring program of CARdiovascular disease (WHO-MONICA Project) is now producing a number of hypotheses about the application of internationally defined criteria and tools for SES evaluation in the Italian area of the Project, Area Brianza. After a short review of some main conceptual and methodological problems, a proposal is presented of an SES index, derived from the pooled data of two population surveys carried out in this area. From a randomized sample of 3200 residents, 25-64 years old, stratified by sex and age decade, 1731 subjects, 594 females and 1137 males, employed at the time of the screening were extracted. Four variables were considered: age, education, occupational level and job-strain (according to the Karasek-Theorell model) by which each subject was classified in three levels--high, medium, low--of education and occupation, whose combination was used to obtain as many levels of socio-economic status. This a method of building an SES index is based on a sequence of approximations following two essential criteria: limitation of the variables to be surveyed, through standardized procedures; ability to identify the "low" SES category, presumably more at risk for disease.

  8. Halden reactor project

    International Nuclear Information System (INIS)

    1981-01-01

    Accomplishments realized during 1981 are summarized in this report. Reactor safety considerations continue to be the prime motivation for the Halden fuel programme. A major part of the experimental efforts deal with effects of loss-of-coolant accidents (LOCA) on fuel thermal and dimensional response. Fuel defect mechanisms and probabilities, both during safety related accident sequences and in response to operational transients, are also extensively studied. The programme encompasses current fuel designs as well as design modifications expected to improve performance. The Halden Project is expanding its work on process computer applications with emphasis on operator-process communication and operator guidance systems. This includes human factors experiments, control room layout and design, alarm handling systems and core surveillance. The principal tool being developed for performing realistic experiments in this field is the new control room with a full scope training simulator model of a nuclear power plant

  9. Measurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF Project

    Directory of Open Access Journals (Sweden)

    L. Menut

    2000-11-01

    Full Text Available The "Étude et Simulation de la QUalité de l'air en Ile de France" (ESQUIF project is the first integrated project dedicated to the study of the processes leading to air pollution events over the Paris area. The project was carried out over two years (summer 1998 to winter 2000 to document all types of meteorological conditions favourable to air quality degradation, and in particular to photo oxydant formation. The goals of ESQUIF are (1 to improve our understanding of the relevant chemical and dynamical processes and, in turn, improve their parametrizations in numerical models, and (2 to improve and validate existing models dedicated to pollution analysis, scenarios and/or forecasting, by establishing a comprehensive and thorough database. We present the rationale of the ESQUIF project and we describe the experimental set-up. We also report on the first experiments which took place during the summer of 1998 involving surface networks, and remote sensing instruments as well as several aircraft. Focusing on three days of August 1998, the relative contributions of long-range transported and locally-produced ozone to the elevated ozone concentrations observed during this period are discussed and chemistry-transport model preliminary results on this period are compared to measurements.Key words: Atmospheric composition and structure (pollution – urban and regional; troposphere – composition and chemistry – Meteorology and atmospheric dynamics (mesoscale meteorology

  10. Cochrane Acute Respiratory Infections Group's Stakeholder Engagement Project identified systematic review priority areas.

    Science.gov (United States)

    Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris

    2018-05-22

    Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.

  11. Temperature changes in Three Gorges Reservoir Area and linkage with Three Gorges Project

    Science.gov (United States)

    Song, Zhen; Liang, Shunlin; Feng, Lian; He, Tao; Song, Xiao-Peng; Zhang, Lei

    2017-05-01

    The Three Gorges Project (TGP) is one of the largest hydroelectric projects throughout the world. It has brought many benefits to the society but also led to endless debates about its environmental and climatic impacts. Monitoring the spatiotemporal variations of temperature in the Three Gorges Reservoir Area (TGRA) is important for understanding the climatic impacts of the TGP. In this study, we used remote sensing-based land surface temperature (LST) and ground-measured air temperature data to investigate temperature changes in the TGRA. Results showed that during the daytime in summer, LST exhibited significant cooling (1-5°C) in the downstream region of the reservoir, whereas LST during the nighttime in winter exhibited significant warming (1-5°C) across the entire reservoir. However, these cooling and warming effects were both locally constrained within 5 km buffer along the reservoir. The changes in air temperature were consistent with those in LST, with 0.67°C cooling in summer and 0.33°C warming in winter. The temperature changes along the reservoir not only resulted from the land-water conversion induced by the dam impounding but were also related to the increase of vegetation cover caused by the ecological restoration projects. Significant warming trends were also found in the upstream of TGRA, especially during the daytime in summer, with up to 5°C for LST and 0.52°C for air temperature. The warming was caused mainly by urban expansion, which was driven in part by the population resettlement of TGP. Based on satellite observations, we investigated the comprehensive climatic impacts of TGP caused by multiple factors.

  12. Transferability of Data Related to the Underground Test Area Project, Nevada Test Site, Nye County, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Stoller-Navarro Joint Venture

    2004-06-24

    This document is the collaborative effort of the members of an ad hoc subcommittee of the Underground Test Area (UGTA) Technical Working Group (TWG). The UGTA Project relies on data from a variety of sources; therefore, a process is needed to identify relevant factors for determining whether material-property data collected from other areas can be used to support groundwater flow, radionuclide transport, and other models within a Corrective Action Unit (CAU), and for documenting the data transfer decision and process. This document describes the overall data transfer process. Separate Parameter Descriptions will be prepared that provide information for selected specific parameters as determined by the U.S. Department of Energy (DOE) UGTA Project Manager. This document and its accompanying appendices do not provide the specific criteria to be used for transfer of data for specific uses. Rather, the criteria will be established by separate parameter-specific and model-specific Data Transfer Protocols. The CAU Data Documentation Packages and data analysis reports will apply the protocols and provide or reference a document with the data transfer evaluations and decisions.

  13. Tribal Grant Program Area Polygons with Project Officer and Tribal Contact Information, US EPA Region 9, 2015, Regional Tribal Operations Committee

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset contains information pertaining to EPA Region 9 project officers and their areas of oversight, EPA Region 9 grant program recipients and grant types,...

  14. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  15. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  16. Promotion and diffusion of tha career Bachelor and Licenciature of Mathematics Teaching in rural areas of Costa Rica project: effects and results

    Directory of Open Access Journals (Sweden)

    Jorge Arroyo Hernández

    2016-03-01

    Full Text Available This article describes the purpose and activities of the project Promoting Mathematics Education in Rural Areas of Costa Rica. The activity has focused on two objectives. First, supporting and monitoring students who have expressed interest in studying a mathematics teacher. To achieve this, it has been working with students who have an ideal profile for the career, mainly from rural areas. The second objective is to conduct training workshops for high school in-service teachers, to strengthen and improve their knowledge in the area of mathematics. Among the results of the project, it can be highlighted a significant increase in the enrollment of students in the career of Mathematics Education in 2010 and 2011, and the training processes in the field of Real Functions of Real Variable and Geometry at different regional areas mostly rural as Aguirre, Sarapiquí, Coto, Buenos Aires, Limón, Cañas, Pérez Zeledón, Nicoya, Los Santos, Turrialba, Puriscal, Desamparados, San Carlos, Puntarenas, Limón, Liberia, Santa Cruz y Upala.

  17. Evaluation of the Vocational Preparation and Success of Handicapped Individuals Who Reside in Rural Areas of Florida. Florida Rural Research Project. Final Report.

    Science.gov (United States)

    Budd, Diane M.

    Phase 2 of a three-phase project examined the secondary education background and employment adjustment of handicapped youth in rural counties in Florida. (Phase 1 was a pilot study.) Subjects were former special education students in five rural project counties who had been identified as needing services in the area of educable mental retardation,…

  18. Mammography with and without radiolucent positioning sheets : Comparison of projected breast area, pain experience, radiation dose and technical image quality

    NARCIS (Netherlands)

    Timmers, Janine; ten Voorde, Marloes; van Engen, Ruben E.; van Landsveld-Verhoeven, Cary; Pijnappel, Ruud; Droogh-de Greve, Kitty; den Heeten, Gerard J.; Broeders, Mireille J. M.

    2015-01-01

    Purpose: To compare projected breast area, image quality, pain experience and radiation dose between mammography performed with and without radiolucent positioning sheets. Methods: 184 women screened in the Dutch breast screening programme (May-June 2012) provided written informed consent to have

  19. Preliminary Nearshore Sedimentation Rate Analysis of the Tuungane Project Northern Mahale Conservation Area, Lake Tanganyika (Tanzania)

    Science.gov (United States)

    Smiley, R. A.; McGlue, M. M.; Yeager, K. M.; Soreghan, M. J.; Lucas, J.; Kimirei, I.; Mbonde, A.; Limbu, P.; Apse, C.

    2017-12-01

    The combined effects of climate change, overfishing, and sediment pollution are altering Lake Tanganyika's littoral fisheries in profoundly negative ways. One method for conserving critical fish resources and safeguarding biodiversity in Lake Tanganyika is by establishing small-scale nearshore protected zones, which can be administrated by lakeshore villagers organized into beach management units (BMUs). Each BMU endeavors to manage offshore "no-catch" protected zones, prohibit the use of illegal fishing gear, and promote sustainable agriculture that abates erosion in the lake watershed, in order to mitigate sediment pollution in the lake. We adopted a limnogeological approach to assist in characterizing the littoral zone associated with BMUs in the northern Mahale region of Lake Tanganyika (Tanzania), a critical conservation area for the Nature Conservancy's Tuungane Project (https://www.nature.org/ourinitiatives/regions/africa/wherewework/tuungane-project.xml). We hypothesized that BMUs with heavy onshore agricultural activity would experience relatively high offshore sedimentation rates, due to enhanced sediment-laden runoff in the wet season. Such changes are predicted to alter benthic substrates and degrade habitat available for fish spawning. We mapped bathymetry and sediment types along a 29 km2 area of the littoral zone using high-resolution geophysical tools, and assessed short-term sedimentation rates using sediment cores and radionuclide geochronology (210Pb). Initial results from 210Pb analyses show that sedimentation rates at the mud-line ( 85-100 m water depth) are relatively slow but spatially variable in the northern Mahale area. Offshore of the Kalilani village BMU, linear sedimentation rates are 0.50 mm/yr. By contrast, sedimentation rates offshore from the Igualula village BMU are 0.90-1.30 mm/yr. Higher sedimentation rates near Igualula are consistent with greater sediment inputs from the nearby Lagosa River and its watershed, which has been

  20. Projections of tsunami inundation area coupled with impacts of sea level rise in Banda Aceh, Indonesia

    Science.gov (United States)

    Tursina, Syamsidik, Kato, Shigeru

    2017-10-01

    In a long term, sea level rise is anticipated to give devastating effects on Banda Aceh, as one of the coastal cities in the northern tip of Sumatra. The growth of the population and buildings in the city has come to the stage where the coastal area is vulnerable to any coastal hazard. Some public facilities and settlements have been constructed and keep expanding in the future. According to TOPEX/POSEIDON satellite images, 7 mm/year the sea level has been risen between 1992 and 2015 in this area. It is estimated that in the next 100 years, there will be 700 mm additional sea level rise which will give a setback more over to a rather flat area around the coast. This research is aim at investigating the influence of sea level rise toward the tsunami inundation on the land area particularly the impacts on Banda Aceh city. Cornell Multigrid Coupled Tsunami Model (COMCOT) simulation numerically generated tsunami propagation. Topography and bathymetry data were collected from GEBCO and updated with the available nautical chart (DISHIDROS, JICA, and field measurements). Geological movement of the underwater fault was generated using Piatanesi and Lorito of 9.15 Mw 2004 multi-fault scenario. The inundation area produced by COMCOT revealed that the inundation area was expanded to several hundred meters from the shoreline. To investigate the impacts of tsunami wave on Banda Aceh, the inundation area were digitized and analyzed with Quantum GIS spatial tools. The Quantum GIS analyzed inundations area affected by the projected tsunami. It will give a new tsunami-prone coastal area map induced by sea level rise in 100 years.

  1. Future travel demand and its implications for transportation infrastructure investments in the Texas Triangle.

    Science.gov (United States)

    2009-03-01

    This study takes a megaregion approach to project future travel demand and choice of transport : modes in the Texas Triangle, which is encompassed by four major metropolitan areas, Dallas-Fort : Worth, Houston, San Antonio, and Austin. The model was ...

  2. West Valley Demonstration Project, Waste Management Area #3 -- Closure Alternative I

    Energy Technology Data Exchange (ETDEWEB)

    Marschke, Stephen F. [Environmental Measurements Laboratory (EML), New York, NY (United States)

    2000-06-30

    The Draft Environmental Impact Statement for the completion of the West Valley Demonstration Project and closure and/or long-term management of facilities at the Western New York Nuclear Service Center divided the site into Waste Management Areas (WMAs), and for each WMA, presented the impacts associated with five potential closure alternatives. This report focuses on WMA 3 (the High-Level Waste (HLW) Storage Area (Tanks 8D-1 and 8D-2), the Vitrification Facility and other facilities) and closure Alternative I (the complete removal of all structures, systems and components and the release of the area for unrestricted use), and reestimates the impacts associated with the complete removal of the HLW tanks, and surrounding facilities. A 32-step approach was developed for the complete removal of Tanks 8D-1 and 8D-2, the Supernatant Treatment System Support Building, and the Transfer Trench. First, a shielded Confinement Structure would be constructed to reduce the shine dose rate and to control radioactivity releases. Similarly, the tank heels would be stabilized to reduce potential radiation exposures. Next, the tank removal methodology would include: 1) excavation of the vault cover soil, 2) removal of the vault roof, 3) cutting off the tank’s top, 4) removal of the stabilized heel remaining inside the tank, 5) cutting up the tank’s walls and floor, 6) removal of the vault’s walls, the perlite blocks, and vault floor, and 7) radiation surveying and backfilling the resulting hole. After the tanks are removed, the Confinement Structure would be decontaminated and dismantled, and the site backfilled and landscaped. The impacts (including waste disposal quantities, emissions, work-effort, radiation exposures, injuries and fatalities, consumable materials used, and costs) were estimated based on this 32 step removal methodology, and added to the previously estimated impacts for closure of the other facilities within WMA 3 to obtain the total impacts from

  3. Learning from the innovative open practices of three international health projects: IACAPAP, VCPH and Physiopedia

    Directory of Open Access Journals (Sweden)

    Tony Coughlan

    2015-04-01

    Full Text Available Open educational resources and open educational practices are being increasingly used around the globe to train and support professionals in areas where funding and resources are scarce. This paper evaluates the open educational practices (OEP of three global health projects operating outside academia - the International Association for Child and Adolescent Psychiatry and Allied Professions (IACAPAP, the Virtual Campus of Public Health (VCPH, and Physiopedia. Each project aims to pool and share professional expertise, to the particular benefit of practitioners in low-income countries. This form of online knowledge-sharing appears to offer huge advantages to the health/public health sector, especially when conducted in the open, at a time when there is a huge global shortfall of healthcare workers and a need for cost-effective, high quality training.We evaluated the three projects using two frameworks –the OPAL open educational practices maturity matrix, and Vrieling’s OEP social configuration framework. We identified numerous innovative OEP from which academia, and indeed public health professionals around the world could learn, for example IACAPAP’s open textbook, VCPH’s trilingual OER repository, and Physiopedia’s wiki and use of open badges. However, some OEP –for example localisation of resources– are not accommodated by either of the frameworks we used.  We argue that an extended OEP evaluation and impact framework is needed in order to better encompass OEP outside formal education. http://dx.doi.org/10.5944/openpraxis.7.2.188

  4. Beyond the library walls: use of slow-scan television.

    OpenAIRE

    Lorenzi, N M; Kues, J R; Anthony, S S

    1984-01-01

    The Telecommunications Information Network (TIN) was an applied research project that evaluated the ability of slow-scan television to provide medical information on demand to health-care professionals at hospitals far from any urban area. This paper reviews the TIN project, describes its use, and discusses system advantages and disadvantages. System evaluation encompasses (1) project benefits; (2) technical barriers to implementation and utilization; (3) the replication of services and the t...

  5. Mammography with and without radiolucent positioning sheets: Comparison of projected breast area, pain experience, radiation dose and technical image quality

    NARCIS (Netherlands)

    Timmers, Janine; ten Voorde, Marloes; van Engen, Ruben E.; van Landsveld-Verhoeven, Cary; Pijnappel, Ruud; Droogh-de Greve, Kitty; den Heeten, Gerard J.; Broeders, Mireille J. M.

    2015-01-01

    To compare projected breast area, image quality, pain experience and radiation dose between mammography performed with and without radiolucent positioning sheets. 184 women screened in the Dutch breast screening programme (May-June 2012) provided written informed consent to have one additional image

  6. 100 Area D4 Project Building Completion Report: December 2008 to December 2009

    International Nuclear Information System (INIS)

    Finucane, K.G.; Harrie, J.P.

    2010-01-01

    This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009. The following buildings are included in this report: 11-N Change Room; 13-N Storage Building; 107-N Basin Recirculation Facility; 108-N Chemical Unloading Facility; 183-ND Resin Disposal Pit; 183-F Clearwells; 188-D Ash Disposal Pit; 1524-N Hazardous Waste Storage Pad; 1525-N Laydown Storage Area; 1607-Ni Sewage Tank; 1607-N2 Sewage Tank; 1706-NA Sewage Lift Station; 1904-D Outfall Structure; MO-013 Mobile Office Trailer; MO-422 Mobile Office Trailer; and MO-999 Mobile Office Trailer. Demolition debris and soil associated with completion of these buildings were disposed at the Environmental Restoration Disposal Facility (ERDF), located at the Hanford Site. Postdemolition direct hand instrument surveys and Global Positioning Environmental Radiological Survey (GPERS) surveys were performed on excavations after loadout of debris and prior to backfill. The 100 Area D4/Interim Safe Storage (ISS) project personnel worked a total of approximately 137,930 hours (manual and non-manual, not including subcontractors) from December 1, 2008, to December 31, 2009. During this time there were 10 Occupational Safety and Health Administration (OSHA) recordable injuries, two of which involved lost time. There also were 27 first aid cases during this time period. No clothing contamination and no skin contamination incidents occurred during demolition of the 100 Area buildings. Workers received 7,350.2 person-mrem of radiological exposure from December 1, 2008, to December 31, 2009 during their support of D4 activities associated with the buildings discussed in this report. All boundary air sample results were below procedural action levels for the duration of the work performed.

  7. Induced Polarization with Electromagnetic Coupling: 3D Spectral Imaging Theory, EMSP Project No. 73836

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, F. Dale; Sogade, John

    2004-12-14

    This project was designed as a broad foundational study of spectral induced polarization (SIP) for characterization of contaminated sites. It encompassed laboratory studies of the effects of chemistry on induced polarization, development of 3D forward modeling and inversion codes, and investigations of inductive and capacitive coupling problems. In the laboratory part of the project a physico-chemical model developed in this project was used to invert laboratory IP spectra for the grain size and the effective grain size distribution of the sedimentary rocks as well as the formation factor, porosity, specific surface area, and the apparent fractal dimension. Furthermore, it was established that the IP response changed with the solution chemistry, the concentration of a given solution chemistry, valence of the constituent ions, and ionic radius. In the field part of the project, a 3D complex forward and inverse model was developed. It was used to process data acquired at two frequencies (1/16 Hz and 1/ 4Hz) in a cross-borehole configuration at the A-14 outfall area of the Savannah River Site (SRS) during March 2003 and June 2004. The chosen SRS site was contaminated with Tetrachloroethylene (TCE) and Trichloroethylene (PCE) that were disposed in this area for several decades till the 1980s. The imaginary conductivity produced from the inverted 2003 data correlated very well with the log10 (PCE) concentration derived from point sampling at 1 ft spacing in five ground-truth boreholes drilled after the data acquisition. The equivalent result for the 2004 data revealed that there were significant contaminant movements during the period March 2003 and June 2004, probably related to ground-truth activities and nearby remediation activities. Therefore SIP was successfully used to develop conceptual models of volume distributions of PCE/TCE contamination. In addition, the project developed non-polarizing electrodes that can be deployed in boreholes for years. A total of 28

  8. An aerial radiological survey of the South Texas Project Electric Generating Station and surrounding area, Bay City, Texas

    International Nuclear Information System (INIS)

    Thompson, J.M.

    1988-12-01

    An aerial radiological survey was conducted over the South Texas Project Electric Generating Station (STPEGS) near Bay City, Texas, during the period 25 March to 4 April 1988. The purpose of the 259-square-kilometer (100-square-mile) survey was to document the terrestrial gamma environment of the plant and surrounding area. An exposure rate contour map at 1 meter above ground level (AGL) was constructed from the gamma data and overlaid on an aerial photograph and map of the area. Exposure rates were observed up to 10μR/h over land. No areas of enhanced exposure rates were observed. Ground-based exposure rate measurements and soil samples were obtained to support the aerial data. Oblique aerial photographs of the plant were also acquired during the survey. 9 refs., 4 figs., 1 tab

  9. Measurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF Project

    Directory of Open Access Journals (Sweden)

    L. Menut

    Full Text Available The "Étude et Simulation de la QUalité de l'air en Ile de France" (ESQUIF project is the first integrated project dedicated to the study of the processes leading to air pollution events over the Paris area. The project was carried out over two years (summer 1998 to winter 2000 to document all types of meteorological conditions favourable to air quality degradation, and in particular to photo oxydant formation. The goals of ESQUIF are (1 to improve our understanding of the relevant chemical and dynamical processes and, in turn, improve their parametrizations in numerical models, and (2 to improve and validate existing models dedicated to pollution analysis, scenarios and/or forecasting, by establishing a comprehensive and thorough database. We present the rationale of the ESQUIF project and we describe the experimental set-up. We also report on the first experiments which took place during the summer of 1998 involving surface networks, and remote sensing instruments as well as several aircraft. Focusing on three days of August 1998, the relative contributions of long-range transported and locally-produced ozone to the elevated ozone concentrations observed during this period are discussed and chemistry-transport model preliminary results on this period are compared to measurements.

    Key words: Atmospheric composition and structure (pollution – urban and regional; troposphere – composition and chemistry – Meteorology and atmospheric dynamics (mesoscale meteorology

  10. Analysis of the impact of the Dutch Heat Act on projects and an inventory of stakeholders

    International Nuclear Information System (INIS)

    Budding, B.; Gerrits, W.; Grootscholten, C.

    2010-08-01

    The Dutch Heat Act was adopted by the Dutch Lower Chamber in February 2009. The main aim of the Act is reliable delivery of heat at reasonable prices and conditions to protect the consumer. The Dutch Ministry of Economic Affairs commissioned a study on the effect of the Heat Act on investment decisions for new heat projects, encompassing a quantitative and a qualitative assessment. [nl

  11. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  12. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  13. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  14. Methodology for Project Governence in CURS

    OpenAIRE

    Hribovšek, Anja

    2010-01-01

    Rare are organizations that haven’t met with project way of work yet. This also applies to government bodies. The degree addresses two areas which are very important for organizations that want to maintain control over costs, risk, functionality and complexity of a project. The first area is project management and the second area is system development process. The main purpose of the degree is to execute a complete analysis on both mentioned areas and to prepare or to renovate the met...

  15. Subsidy project in fiscal 1999 to accelerate forming an environment harmonizing energy community. Report on the survey on energy supply investigation project by using a wastes electric power generation system in wide city and village area in the Joso area; Joso chiho koiki shichosonken ni okeru haikibutsu hatsuden ni yoru energy kyokyu chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the feasibility of a project to be performed jointly by the Business Bureau of the Ibaraki Prefectural Government who takes charge of the wastes electric power generation project, and the Joso Area Wide City and Village Area Affair Association who performs refuse disposal project. The basic plan for the system may be summarized as follows: the gasification melting furnace shall have a capacity of 420 tons per day, discharge concentrations of dioxins shall be 0.01 ng-TEQ/m{sup 3} or less, the power generation system shall be the steam high-temperature high-pressure system, the power generation efficiency shall be 25%, and the electric power generation takes priority, with the steam after power generation use utilized for heat supply. The evaluation on the effect of introducing the project can be summarized as follows: in the social aspect, the execution of the joint project is safe and effective for the residents and society; it contributes to activation of the areas and assistance to the regional activities; correspondence will be possible to the tighter enforcement of the laws and regulations in the future; in the environmental aspect, discharge of carbon dioxide, sulfur oxides, and dioxins can be suppressed; and in the economic aspect, the ultimate disposal quantity in refuse treatment will be reduced greatly, serving for saving the treatment expense, and the refuse treatment cost may be reduced by assuring the earning from selling the electric power. (NEDO)

  16. INVAP and its project management capabilities: a key to company success

    International Nuclear Information System (INIS)

    Salvatore, Marcelo; Delgado, Ricardo; Niklison, Carlos; Ordonez, Juan Pablo; Gerbino, Juan Jose Gil

    2002-01-01

    Over the past 26 years, several factors have contributed to INVAP's projection into domestic and overseas operations. Of these, the most recognized is of course the technological capabilities INVAP keeps developing to satisfy our customer's requirements. In a second thought, the other factor is the strategic objective of providing specific purpose customer oriented solutions. The less obvious third important factor in this trilogy is the successful application of Project Management techniques and methods. INVAP's vision on Project Management encompasses well known concepts as: Integrated Management, Proactive solutions, Cost Control and Reporting, Quality Assurance, Target Schedules, Performance Requirements, Risk Management, Configuration Management and Integrated Logistic Support. After 2 years of execution of the Replacement Research Reactor Project for the Australian Nuclear Science and Technology Organization, our Project Management methodology have allowed us to timely meet all project milestones, complete basic and detail engineering, timely deliver the preliminary safety reports, manufacture and test technological concepts in specifically built mock ups and overcome risky situations -like the economical panorama in Argentina- without jeopardizing our Contractual commitments. Present paper depicts the practical approach INVAP has for Project Management -particularly within the Nuclear Division-, and a description of the tools to such aim developed. (author)

  17. Hydrodynamic characterization in areas under influence in the petroleum industry; Caracterizacao hidrodinamica em areas sob influencia na industria petrolifera

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Daniel Alexsander Silva dos; Silva, Andre Giskard Aquino da [Rio Grande do Norte Univ., Natal, RN (Brazil)]. E-mail: danielsandersilva@hotmail.com; Vital, Helenice [Conselho Nacional de Desenvolvimento Cientifico e Tecnologico (CNPq), Brasilia, DF (Brazil); Silveira, Iracema Miranda da [Museu Camara Cascudo, Natal, RN (Brazil); Chaves, Marcelo dos Santos; Lima, Zuleide Maria Carvalho [Rio Grande do Norte Univ., Natal, RN (Brazil). Programa de Pos-graduacao em Geodinamica e Geofisica

    2003-07-01

    For elaboration of contingency plans it is necessary to execute the mapping of sensitive areas to oil spill, as well as to create suitable forecast models for oil pollution movements. These models should start from a consistent database, so that it can encompass the several phases of the environmental monitoring. In both cases hydrodynamic data are essential. The analysis of hydrodynamic parameters is also an important phase for the knowledge of the Holocene evolution of the study area, as well as for execution of a suitable development policy to be applied on the area. The activities developed in this research involve collection of data 'in situ' at the Galinhos-Guamare and Diogo Lopes lagoons, as well as data manipulation referring to the littoral drift collected monthly along the North coast of the state of Rio Grande do Norte by members of the Grupo de Geologia e Geofisica Marinha e Melhoramento Ambiental (GGEMMA) from UFRN.

  18. Literature review for Texas Department of Transportation Research Project 0-4695: Guidance for design in areas of extreme bed-load mobility, Edwards Plateau, Texas

    Science.gov (United States)

    Heitmuller, Franklin T.; Asquith, William H.; Fang, Xing; Thompson, David B.; Wang, Keh-Han

    2005-01-01

    A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0–4695: Guidance for Design in Areas of Extreme Bed-Load Mobility. The study area comprises the western half of the Edwards Plateau in central Texas. Three primary foci of the literature review are journal articles, edited volumes, and government publications. Major themes within the body of literature include deterministic sediment transport theory and equations, development of methods to measure and analyze fluvial sediment, applications and development of theory in natural channels and flume experiments, and recommendations for river management and structural design. The literature review provides an outline and foundation for the research project to characterize extreme bed-load mobility in rivers and streams across the study area. The literature review also provides a basis upon which potential modifications to low-water stream-crossing design in the study area can be made.

  19. 77 FR 23658 - Six Rivers National Forest, Gasquet Ranger District, California, The Smith River National...

    Science.gov (United States)

    2012-04-20

    ... National Forest, Gasquet Ranger District, California, The Smith River National Recreation Area [email protected] . Please insure that ``Smith River NRA Restoration and Motorized Travel Management'' occurs... UARs totaling 80 miles. The project encompasses the Smith River NRA and Gasquet Ranger District...

  20. Deciphering priority areas for improving project risk management ...

    African Journals Online (AJOL)

    unethical practices contributing to poor project delivery in the ZCI,. Mukumbwa and Muya .... Egypt, Ghana, India, Indonesia, Jordan, Malaysia, Mozambique,. Nigeria, Pakistan ..... The analysis is based on the Pareto principle, also known as the 80/20 .... poor interpretation of contract; poor safety on site; disputes; high taxes;.

  1. The difficulties in the development of mining tourism projects: the case of La Unión Mining District (SE Spain

    Directory of Open Access Journals (Sweden)

    Héctor M.Conesa

    2010-10-01

    Full Text Available Mine sites are atypical industrial sites because they encompass not only economic but also landscape and anthropologic components. The need of developing new economic opportunities in areas, where a “mining monoculture” was the economic backbone, has resulted in the re-interpretation of mining activity from a cultural viewpoint. Some traditional mining towns from both, recent and ancient times, have forgone mining activity and have become new tourist attractions sites. However, the process of developing tourism in these zones is not easy and necessarily incorporates social, economic and environmental requirements. This paper describes the constraints, possibilities and efforts that meet in the former mining town of La Unión, Southeast Spain. It will be investigated in a critic point of view the current projects that, though in low number, try to preserve the identity and history of the town while generating relatively significant economic incomes.

  2. Integrated conservation and development: evaluating a community-based marine protected area project for equality of socioeconomic impacts

    Science.gov (United States)

    Gurney, Georgina G.; Pressey, Robert L.; Cinner, Joshua E.; Pollnac, Richard; Campbell, Stuart J.

    2015-01-01

    Despite the prevalence of protected areas, evidence of their impacts on people is weak and remains hotly contested in conservation policy. A key question in this debate is whether socioeconomic impacts vary according to social subgroup. Given that social inequity can create conflict and impede poverty reduction, understanding how protected areas differentially affect people is critical to designing them to achieve social and biological goals. Understanding heterogeneous responses to protected areas can improve targeting of management activities and help elucidate the pathways through which impacts of protected areas occur. Here, we assessed whether the socioeconomic impacts of marine protected areas (MPAs)—designed to achieve goals for both conservation and poverty alleviation—differed according to age, gender or religion in associated villages in North Sulawesi, Indonesia. Using data from pre-, mid- and post-implementation of the MPAs for control and project villages, we found little empirical evidence that impacts on five key socioeconomic indicators related to poverty differed according to social subgroup. We found suggestive empirical evidence that the effect of the MPAs on environmental knowledge differed by age and religion; over the medium and long terms, younger people and Muslims showed greater improvements compared with older people and Christians, respectively. PMID:26460130

  3. Integrated conservation and development: evaluating a community-based marine protected area project for equality of socioeconomic impacts.

    Science.gov (United States)

    Gurney, Georgina G; Pressey, Robert L; Cinner, Joshua E; Pollnac, Richard; Campbell, Stuart J

    2015-11-05

    Despite the prevalence of protected areas, evidence of their impacts on people is weak and remains hotly contested in conservation policy. A key question in this debate is whether socioeconomic impacts vary according to social subgroup. Given that social inequity can create conflict and impede poverty reduction, understanding how protected areas differentially affect people is critical to designing them to achieve social and biological goals. Understanding heterogeneous responses to protected areas can improve targeting of management activities and help elucidate the pathways through which impacts of protected areas occur. Here, we assessed whether the socioeconomic impacts of marine protected areas (MPAs)-designed to achieve goals for both conservation and poverty alleviation-differed according to age, gender or religion in associated villages in North Sulawesi, Indonesia. Using data from pre-, mid- and post-implementation of the MPAs for control and project villages, we found little empirical evidence that impacts on five key socioeconomic indicators related to poverty differed according to social subgroup. We found suggestive empirical evidence that the effect of the MPAs on environmental knowledge differed by age and religion; over the medium and long terms, younger people and Muslims showed greater improvements compared with older people and Christians, respectively. © 2015 The Author(s).

  4. Sacramento River Flood Control Project, California, Mid-Valley Area, Phase III. Design Memorandum, Volume 2 of 2

    Science.gov (United States)

    1995-08-01

    a mix of native grasses upon completion of construction. The lime treatment construction alternative would render the top 4 feet of treated soil...project area. Site CA-Sut-il is a prehistoric burial mound recorded in 1934 by R.F. Heizer . He noted that this mound could be "a key mound to...Endangered Species section. The topical lime treatment construction alternative proposed for Sites 3, 12, 12A, 13, 15, 15A, and 15B, would render the

  5. Synaptic plasticity in the hippocampal area CA1-subiculum projection: implications for theories of memory.

    Science.gov (United States)

    O'Mara, S M; Commins, S; Anderson, M

    2000-01-01

    This paper reviews investigations of synaptic plasticity in the major, and underexplored, pathway from hippocampal area CA1 to the subiculum. This brain area is the major synaptic relay for the majority of hippocampal area CA1 neurons, making the subiculum the last relay of the hippocampal formation prior to the cortex. The subiculum thus has a very major role in mediating hippocampal-cortical interactions. We demonstrate that the projection from hippocampal area CA1 to the subiculum sustains plasticity on a number of levels. We show that this pathway is capable of undergoing both long-term potentiation (LTP) and paired-pulse facilitation (PPF, a short-term plastic effect). Although we failed to induce long-term depression (LTD) of this pathway with low-frequency stimulation (LFS) and two-pulse stimulation (TPS), both protocols can induce a "late-developing" potentiation of synaptic transmission. We further demonstrate that baseline synaptic transmission can be dissociated from paired-pulse stimulation of the same pathway; we also show that it is possible, using appropriate protocols, to change PPF to paired-pulse depression, thus revealing subtle and previously undescribed mechanisms which regulate short-term synaptic plasticity. Finally, we successfully recorded from individual subicular units in the freely-moving animal, and provide a description of the characteristics of such neurons in a pellet-chasing task. We discuss the implications of these findings in relation to theories of the biological consolidation of memory.

  6. PROJECTS ON AIRPORTS, AIRFIELDS, HELICOPTER AERODROMES AND LANDING GROUNDS SANITARY PROTECTION AREAS AS THE BASIS OF THEIR ACTIVITY COMPLIANCE ASSESSMENT TO ECOLOGICAL REQUIREMENTS

    Directory of Open Access Journals (Sweden)

    Oleg A. Kartyshev

    2017-01-01

    Full Text Available Ten years experience of the development of domestic airports sanitary protection zones projects in civil aviation based on Sanitary Regulations and Norms 2.2.1/2.1.1.1200-03 requirements is analyzed, the reasons of loss of quality of project works and delaying of coordination terms at the last stage of the development are established. It is shown that among the main reasons for current negative situation with projects development and coordination are: absence of a check algorithm of settlement borders of areas and contours of aviation noise with the use of natural researches methods in Sanitary Regulations and Norms 2.2.1/2.1.1.1200-03; absence of methods of amendment in projects and regulations of establishment of the airport sanitary protection zones final dimensions. Examples of oversized and undersized noise areas and ones of the polluting substances dispersion as well as the reasons of local authorities’ interests in it are given.Conceptional strategies which should be used in the edition of a new Russian conservancy normative document regulating the development of projects on sanitary protection areas. New document will allow to consider various factors of negative environmental impact of the airports, airfields, helicopter aerodromes and landing grounds activities.It is offered to introduce the concept of "aviation noise set index operational card", which will solve the legitimation problem of the aviation noise account in the State Immovable Property Cadaster. Suggestions on equivalent and maximum level magnitude of the sound made at the residential territory of cities and urban-type settlements by flights and aircraft ground operation are given.Standards are supposed to be harmonized with similar international rules and have to provide zone gradation by 5 dBA.Suggestions on the considerations of the revealed deficiencies are made, requirements to project sections structure of sanitary protection zones are formulated, proposals on the

  7. Life cycle assessment of water supply alternatives in water-receiving areas of the South-to-North Water Diversion Project in China.

    Science.gov (United States)

    Li, Yi; Xiong, Wei; Zhang, Wenlong; Wang, Chao; Wang, Peifang

    2016-02-01

    To alleviate the water shortage in northern China, the Chinese government launched the world's largest water diversion project, the South-to-North Water Diversion Project (SNWDP), which delivers water from water-sufficient southern China to water-deficient northern China. However, an up-to-date study has not been conducted to determine whether the project is a favorable option to augment the water supply from an environmental perspective. The life cycle assessment (LCA) methodology integrated with a freshwater withdrawal category (FWI) was adopted to compare water supply alternatives in the water-receiving areas of the SNWDP, i.e., water diversion, wastewater reclamation and seawater desalination. Beijing, Tianjin, Jinan and Qingdao were studied as representative cities because they are the primary water-receiving areas of the SNWDP. The results revealed that the operation phase played the dominant role in all but one of the life cycle impact categories considered and contributed to more than 70% of their scores. For Beijing and Tianjin, receiving water through the SNWDP is the most sustainable option to augment the water supply. The result can be drawn in all of the water-receiving areas of the middle route of the SNWDP. For Jinan and Qingdao, the most sustainable option is the wastewater reclamation system. The seawater desalination system obtains the highest score of the standard impact indicators in all of the study areas, whereas it is the most favorable water supply option when considering the freshwater withdrawal impact. Although the most sustainable water supply alternative was recommended through an LCA analysis, multi-water resources should be integrated into the region's water supply from the perspective of water sustainability. The results of this study provide a useful recommendation on the management of water resources for China. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  9. Ashland Area Support Substation Project

    International Nuclear Information System (INIS)

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power ampersand Light Company's (PP ampersand L) 115-kilovolt (kV) transmission lines and through PP ampersand L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP ampersand L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP ampersand L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them

  10. Baseline survey for rare plant species and native plant communities within the Kamehameha Schools 'Lupea Safe Harbor Planning Project Area, North Kona District, Island of Hawai'i

    Science.gov (United States)

    Jacobi, James; Warshauer, F. R.; Price, Jonathan

    2010-01-01

    Kamehameha Schools, in conjunction with several federal, state, and private organizations, has proposed to conduct conservation management on approximately 5,340 ha (~13,200 acres) of land they own in the vicinity of Kīpukalupea in the North Kona District on the island of Hawai'i. The goal of this program is to restore and enhance the habitat to benefit native plant and animal populations that are currently, or were formerly, found in this site. The initial phase of this project has been focused on various activities including conducting baseline surveys for bird and plant species so Kamehameha Schools could develop a Safe Harbor Agreement (SHA) for the proposed project lands relative to the habitat management and species reintroduction efforts they would like to conduct in the Lupea Project area. This report summarizes methods that were used to collect field data on plant species and communities within the project area, and the results of that initial survey. The information was used to calculate baseline values for all listed threatened or endangered plant species found, or expected to be found, within the project area, and to design a monitoring program to assess changes in plant communities and rare plant species relative to management activities over the duration of the SHA.

  11. The research project on technical information basis for aging management in Fukui and Kinki area. Final report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Nagayama, Shigeru; Watarumi, Chikae; Toudou, Tsugihiko

    2011-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI) as a five-year program effectively, to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the technical strategy map for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants, 2) The development of inspection techniques to monitor the initiation and propagation of defects, 3) The development of a guideline for evaluating weld repair methods, 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2010, 11 continuing research subjects were proposed for this project and all were accepted. Of these, 5 subjects were related to the first topic (pipe thinning), 4 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  12. Research objectives to support the South Florida Ecosystem Restoration initiative-Water Conservation Areas, Lake Okeechobee, and the East/West waterways

    OpenAIRE

    Kitchens, Wiley M.

    1994-01-01

    The South Florida Ecosystem encompasses an area of approximately 28,000 km2 comprising at least 11 major physiographic provinces, including the Kissimmee River Valley, Lake Okeechobee, the Immokalee Rise, the Big Cypress, the Everglades, Florida Bay, the Atlantic Coastal Ridge, Biscayne Bay, the Florida Keys, the Florida Reef Tract, and nearshore coastal waters. South Florida is a heterogeneous system of wetlands, uplands, coastal areas, and marine areas, dominated by the watershe...

  13. 78 FR 7775 - Boulder Canyon Project

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area...), is proposing an adjustment to the Boulder Canyon Project (BCP) electric service base charge and rates... subsequent laws, particularly section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and...

  14. 77 FR 2533 - Boulder Canyon Project

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area...), is proposing an adjustment to the Boulder Canyon Project (BCP) electric service base charge and rates...) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and other acts that specifically apply to...

  15. Towards the creation of a European Network of Earth Observation Networks within GEO. The ConnectinGEO project.

    Science.gov (United States)

    Masó, Joan; Serral, Ivette; Menard, Lionel; Wald, Lucien; Nativi, Stefano; Plag, Hans-Peter; Jules-Plag, Shelley; Nüst, Daniel; Jirka, Simon; Pearlman, Jay; De Maziere, Martine

    2015-04-01

    ConnectinGEO (Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations" is a new H2020 Coordination and Support Action with the primary goal of linking existing Earth Observation networks with science and technology (S&T) communities, the industry sector, the Group on Earth Observations (GEO), and Copernicus. ConnectinGEO aims to facilitate a broader and more accessible knowledge base to support the needs of GEO, its Societal Benefit Areas (SBAs) and the users of the Global Earth Observing System of Systems (GEOSS). A broad range of subjects from climate, natural resources and raw materials, to the emerging UN Sustainable Development Goals (SDGs) will be addressed. The project will generate a prioritized list of critical gaps within available observation data and models to translate observations into practice-relevant knowledge, based on stakeholder consultation and systematic analysis. Ultimately, it will increase coherency of European observation networks, increase the use of Earth observations for assessments and forecasts and inform the planning for future observation systems. ConnectinGEO will initiate a European Network of Earth Observation Networks (ENEON) that will encompass space-based, airborne and in-situ observations networks. ENEON will be composed by project partners representing thematic observation networks along with the GEOSS Science and Technology Stakeholder Network, GEO Communities of Practices, Copernicus services, Sentinel missions and in-situ support data representatives, representatives of the space-based, airborne and in-situ observations European networks (e.g. EPOS, EMSO and GROOM, etc), representatives of the industry sector and European and national funding agencies, in particular those participating in the future ERA-PlaNET. At the beginning, the ENEON will be created and managed by the project. Then the management will be transferred to the network itself to ensure

  16. Projected tritium releases from F ampersand H Area Seepage Basins and the Solid Waste Disposal Facilities to Fourmile Branch

    International Nuclear Information System (INIS)

    Looney, B.B.; Haselow, J.S.; Lewis, C.M.; Harris, M.K.; Wyatt, D.E.; Hetrick, C.S.

    1993-01-01

    A large percentage of the radioactivity released to the environment by operations at the Savannah River Site (SRS) is due to tritium. Because of the relative importance of the releases of tritium from SRS facilities through the groundwater to the environment, periodic evaluation and documentation of the facility operational status, proposed corrective actions, and projected changes/reductions in tritium releases are justified. Past, current, and projected tritium releases from the F and H Area Seepage Basins and the Solid Waste Disposal Facilities (SWDF) to Fourmile Branch are described. Each section provides a brief operational history along with the current status and proposed corrective actions. A conceptual model and quantitative estimates of tritium release from the facilities into the groundwater and the environment are developed. Tritium releases from the F and H Area Seepage Basins are declining and will be further reduced by the implementation of a groundwater corrective action required by the Resource Conservation and Recovery Act (RCRA). Tritium releases from the SWDF have been relatively stable over the past 10 years. It is anticipated that SWDF tritium releases to Fourmile Branch will remain approximately at current levels for at least 10--20 years. Specific characterization activities are recommended to allow an improved projection of tritium flux and to assist in developing plans for plume mitigation. SRS and the South Carolina Department of Health and Environmental Control are developing groundwater corrective action plans for the SWDF. Portions of the SWDF are also regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Reduction of tritium flux is one of the factors considered in the development of the RCRA/CERCLA groundwater corrective action. The final section of the document presents the sum of the projected tritium fluxes from these facilities to Fourmile Branch

  17. Familial X/Y Translocation Encompassing ARSE in Two Moroccan Siblings with Sensorineural Deafness.

    Science.gov (United States)

    Amasdl, Saadia; Smaili, Wiam; Natiq, Abdelhafid; Hassani, Amale; Sbiti, Aziza; Agadr, Aomar; Sanlaville, Damien; Sefiani, Abdelaziz

    2017-01-01

    Unbalanced translocations involving X and Y chromosomes are rare and associated with a contiguous gene syndrome. The clinical phenotype is heterogeneous including mainly short stature, chondrodysplasia punctata, ichthyosis, hypogonadism, and intellectual disability. Here, we report 2 brothers with peculiar gestalt, short stature, and hearing loss, who harbor an X/Y translocation. Physical examination, brainstem acoustic potential evaluation, bone age, hormonal assessment, and X-ray investigations were performed. Because of their dysmorphic features, karyotyping, FISH, and aCGH were carried out. The probands had short stature, hypertelorism, midface hypoplasia, sensorineural hearing loss, normal intelligence as well as slight radial and ulnar bowing with brachytelephalangy. R-banding identified a derivative X chromosome with an abnormally expanded short arm. The mother was detected as a carrier of the same aberrant X chromosome. aCGH disclosed a 3.1-Mb distal deletion of chromosome region Xp22.33pter. This interval encompasses several genes, especially the short stature homeobox (SHOX) and arylsulfatase (ARSE) genes. The final karyotype of the probands was: 46,Y,der(X),t(X;Y)(p22;q12).ish der(X)(DXYS129-,DXYS153-)mat.arr[hg19] Xp22.33(61091_2689408)×1mat,Xp22.33(2701273_3258404)×0mat,Yq11.222q12 (21412851_59310245)×2. Herein, we describe a Moroccan family with a maternally inherited X/Y translocation and discuss the genotype-phenotype correlations according to the deleted genes. © 2017 S. Karger AG, Basel.

  18. Free trade area of the Americas a three level analysis

    OpenAIRE

    Williams, Clay G.

    2006-01-01

    The Free Trade Area of the Americas is a proposed treaty that would encompass the Western Hemisphere-800 million people and a 13 trillion dollar economy. It is a regional agreement that cannot be understood without the interrelated issues at both the international and domestic level. The single most important issue that resides at the nexus of all three of these levels is domestic subsidies on agriculture. FTAA cannot move forward at the regional level without reduction in the U.S. domest...

  19. The primary motor and premotor areas of the human cerebral cortex.

    Science.gov (United States)

    Chouinard, Philippe A; Paus, Tomás

    2006-04-01

    Brodmann's cytoarchitectonic map of the human cortex designates area 4 as cortex in the anterior bank of the precentral sulcus and area 6 as cortex encompassing the precentral gyrus and the posterior portion of the superior frontal gyrus on both the lateral and medial surfaces of the brain. More than 70 years ago, Fulton proposed a functional distinction between these two areas, coining the terms primary motor area for cortex in Brodmann area 4 and premotor area for cortex in Brodmann area 6. The parcellation of the cortical motor system has subsequently become more complex. Several nonprimary motor areas have been identified in the brain of the macaque monkey, and associations between anatomy and function in the human brain are being tested continuously using brain mapping techniques. In the present review, the authors discuss the unique properties of the primary motor area (M1), the dorsal portion of the premotor cortex (PMd), and the ventral portion of the premotor cortex (PMv). They end this review by discussing how the premotor areas influence M1.

  20. MERIS burned area algorithm in the framework of the ESA Fire CCI Project

    Science.gov (United States)

    Oliva, P.; Calado, T.; Gonzalez, F.

    2012-04-01

    The Fire-CCI project aims at generating long and reliable time series of burned area (BA) maps based on existing information provided by European satellite sensors. In this context, a BA algorithm is currently being developed using the Medium Resolution Imaging Spectrometer (MERIS) sensor. The algorithm is being tested over a series of ten study sites with a area of 500x500 km2 each, for the period of 2003 to 2009. The study sites are located in Canada, Colombia, Brazil, Portugal, Angola, South Africa, Kazakhstan, Borneo, Russia and Australia and include a variety of vegetation types characterized by different fire regimes. The algorithm has to take into account several limiting aspects that range from the MERIS sensor characteristics (e.g. the lack of SWIR bands) to the noise presented in the data. In addition the lack of data in some areas caused either because of cloud contamination or because the sensor does not acquire full resolution data over the study area, provokes a limitation difficult to overcome. In order to overcome these drawbacks, the design of the BA algorithm is based on the analysis of maximum composites of spectral indices characterized by low values of temporal standard deviation in space and associated to MODIS hot spots. Accordingly, for each study site and year, composites of maximum values of BAI are computed and the corresponding Julian day of the maximum value and number of observations in the period are registered by pixel . Then we computed the temporal standard deviation for pixels with a number of observations greater than 10 using spatial matrices of 3x3 pixels. To classify the BAI values as burned or non-burned we extract statistics using the MODIS hot spots. A pixel is finally classified as burned if it satisfies the following conditions: i) it is associated to hot spots; ii) BAI maximum is higher than a certain threshold and iii) the standard deviation of the Julian day is less than a given number of days.

  1. Electromagnetics of body area networks antennas, propagation, and RF systems

    CERN Document Server

    Werner, Douglas H

    2016-01-01

    The book is a comprehensive treatment of the field, covering fundamental theoretical principles and new technological advancements, state-of-the-art device design, and reviewing examples encompassing a wide range of related sub-areas. In particular, the first area focuses on the recent development of novel wearable and implantable antenna concepts and designs including metamaterial-based wearable antennas, microwave circuit integrated wearable filtering antennas, and textile and/or fabric material enabled wearable antennas. The second set of topics covers advanced wireless propagation and the associated statistical models for on-body, in-body, and off-body modes. Other sub-areas such as efficient numerical human body modeling techniques, artificial phantom synthesis and fabrication, as well as low-power RF integrated circuits and related sensor technology are also discussed. These topics have been carefully selected for their transformational impact on the next generation of body-area network systems and beyo...

  2. History of radiological characterisation in Studsvik - History of radiological characterisation in decommissioning projects in Studsvik

    International Nuclear Information System (INIS)

    Hedvall, Robert

    2012-01-01

    AB SVAFO is a nuclear waste technology and decommissioning company based in Sweden in the scenic surroundings of Studsvik on the Baltic coast. SVAFO is owned by the Swedish nuclear power industry. The company was created in 1992 by Sydsvenska Vaermekraft AB, Vattenfall AB, Forsmarks Kraftgrupp AB and Oskarshamns Kraftgrupp AB as a consequence of the Act on the Financing of the Management of Certain Radioactive Waste etc, from 1988. AB SVAFO's main business is to take care of formerly state-owned spent nuclear waste at the site, including small amounts of nuclear fuel. Buildings are also included, mainly nuclear waste storage buildings and a research reactor. Some buildings have already been decommissioned and all the fuel is treated. In the past 30 years, various decommissioning projects have been carried out, encompassing areas such as an underground research reactor, a Van de Graaff accelerator, 15,000 m 2 of nuclear laboratories, two 150 m 3 underground concrete sludge silos and several waste-storage buildings. Up till now only one or two persons did a simple characterisation before the project started to get the level of contamination. With the start of the decommissioning of the former uranium mine in Ranstad and the R2-reactor, more efforts have been put for the characterisation. The change in methods will be described. (author)

  3. The Jefferson Lab Quality Assurance Program for the SNS Superconducting Linac Construction Project

    International Nuclear Information System (INIS)

    Joseph Ozelis

    2003-01-01

    As part of a multi-laboratory collaboration, Jefferson Lab is currently engaged in the fabrication, assembly, and testing of 23 cryomodules for the superconducting linac portion of the Spallation Neutron Source (SNS) being built at Oak Ridge National Laboratory. As with any large accelerator construction project, it is vitally important that these components be built in a cost effective and timely manner, and that they meet the stringent performance requirements dictated by the project specifications. A comprehensive Quality Assurance (QA) program designed to help accomplish these goals has been implemented as an inherent component of JLab's SNS construction effort. This QA program encompasses the traditional spectrum of component performance, from incoming parts inspection, raw materials testing, through to sub-assembly and finished article performance evaluation

  4. The Greenland Analogue Project. Yearly Report 2009

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    A deep geological repository for spent nuclear fuel needs to be designed to keep used nuclear fuel isolated from mankind and the environment for a million years. Within this time frame glacial conditions are expected in regions that have been glaciated in the past two to ten million years. Climate induced changes such as the growth of ice sheets and permafrost will influence and alter the ground surface and subsurface environment, including its hydrology, which may impact repository safety. Glaciation impact assessments have to-date used over-simplified models and conservative assumptions, for example in the representation of ice sheet hydrology, that do not reflect the complexity of natural systems and processes. This is largely due to lack of direct observations of such processes from existing ice sheets, which if more readily available could help reduce uncertainties and provide a strong scientific basis for the treatment of glacial impacts in safety assessments. Our current understanding of the hydrological, hydrogeological and hydrogeochemical processes associated with glacial cycles and their impact on the long-term performance of deep geological repositories for spent nuclear fuel will be significantly improved by studying a modern analogue. To advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository, the Greenland Analogue Project (GAP), a four-year field and modelling study of the Greenland ice sheet and sub-surface conditions, has been initiated collaboratively by SKB, Posiva and NWMO. The study site encompasses a land terminus portion of the Greenland ice sheet east of Kangerlussuaq and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project is planned to run from 2009 until 2012. The GAP will conduct the first in situ investigations of some of

  5. The Greenland Analogue Project. Yearly Report 2009

    International Nuclear Information System (INIS)

    2010-12-01

    A deep geological repository for spent nuclear fuel needs to be designed to keep used nuclear fuel isolated from mankind and the environment for a million years. Within this time frame glacial conditions are expected in regions that have been glaciated in the past two to ten million years. Climate induced changes such as the growth of ice sheets and permafrost will influence and alter the ground surface and subsurface environment, including its hydrology, which may impact repository safety. Glaciation impact assessments have to-date used over-simplified models and conservative assumptions, for example in the representation of ice sheet hydrology, that do not reflect the complexity of natural systems and processes. This is largely due to lack of direct observations of such processes from existing ice sheets, which if more readily available could help reduce uncertainties and provide a strong scientific basis for the treatment of glacial impacts in safety assessments. Our current understanding of the hydrological, hydrogeological and hydrogeochemical processes associated with glacial cycles and their impact on the long-term performance of deep geological repositories for spent nuclear fuel will be significantly improved by studying a modern analogue. To advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository, the Greenland Analogue Project (GAP), a four-year field and modelling study of the Greenland ice sheet and sub-surface conditions, has been initiated collaboratively by SKB, Posiva and NWMO. The study site encompasses a land terminus portion of the Greenland ice sheet east of Kangerlussuaq and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project is planned to run from 2009 until 2012. The GAP will conduct the first in situ investigations of some of

  6. Coral Reef Ecosystem Data from the 2010-2011 Kahekili Herbivore Fisheries Management Area, West Maui, Herbivore Enhancement as a Tool for Reef Restoration Project (NODC Accession 0082869)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This research targets the Hawaii Coral Reef Initiative (HCRI) Priority Area A: Kahekili, Maui: Herbivore Fisheries Management Area (KHFMA). The project goal was to...

  7. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  8. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  9. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  10. Aviation System Capacity Program Terminal Area Productivity Project: Ground and Airborne Technologies

    Science.gov (United States)

    Giulianetti, Demo J.

    2001-01-01

    Ground and airborne technologies were developed in the Terminal Area Productivity (TAP) project for increasing throughput at major airports by safely maintaining good-weather operating capacity during bad weather. Methods were demonstrated for accurately predicting vortices to prevent wake-turbulence encounters and to reduce in-trail separation requirements for aircraft approaching the same runway for landing. Technology was demonstrated that safely enabled independent simultaneous approaches in poor weather conditions to parallel runways spaced less than 3,400 ft apart. Guidance, control, and situation-awareness systems were developed to reduce congestion in airport surface operations resulting from the increased throughput, particularly during night and instrument meteorological conditions (IMC). These systems decreased runway occupancy time by safely and smoothly decelerating the aircraft, increasing taxi speed, and safely steering the aircraft off the runway. Simulations were performed in which optimal trajectories were determined by air traffic control (ATC) and communicated to flight crews by means of Center TRACON Automation System/Flight Management System (CTASFMS) automation to reduce flight delays, increase throughput, and ensure flight safety.

  11. EPA oyster project: nitrogen in water. - Transport and fate of nutrient and pathogen loadings into nearshore Puget Sound: consequences for shellfish growing areas

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This project seeks to develop and apply an assessment of shellfish growing area (SGA) vulnerability to closures caused by watershed- and marine-derived pathogens....

  12. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks content removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The purpose of the Old Hydrofracture Facility (OHF) tanks content removal project is to transfer inventory from the five OHF tanks located in Waste Area Grouping (WAG) 5 at Oak Ridge National Laboratory (ORNL) to the Melton Valley Storage Tanks (MVST) liquid low-level (radioactive) waste (LLLW) storage facility, and remediate the remaining OHF tank shells. The major activities involved are identified in this document along with the organizations that will perform the required actions and their roles and responsibilities for managing the project

  13. The NextData Project: a national Italian system for the retrieval, storage, access and diffusion of environmental and climate data from mountain and marine areas

    Science.gov (United States)

    Provenzale, Antonello

    2013-04-01

    Mountains are sentinels of climate and environmental change and many marine regions provide information on past climate variations. The Project of Interest NextData will favour the implementation of measurement networks in remote mountain and marine areas and will develop efficient web portals to access meteoclimatic and atmospheric composition data, past climate information from ice and sediment cores, biodiversity and ecosystem data, measurements of the hydrological cycle, marine reanalyses and climate projections at global and regional scale. New data on the present and past climatic variability and future climate projections in the Alps, the Himalaya-Karakoram, the Mediterranean region and other areas of interest will be obtained and made available. The pilot studies conducted during the project will allow for obtaining new estimates on the availability of water resources and on the effects of atmospheric aerosols on high-altitude environments, as well as new assessments of the impact of climate change on ecosystems, health and societies in mountain regions. The system of archives and the scientific results produced by the NextData project will provide a unique data base for research, for environmental management and for the estimate of climate change impacts, allowing for the development of knowledge-based environmental and climate adaptation policies.

  14. Diversity of Snakes in Rajegwesi Tourism Area, Meru Betiri National Park

    Directory of Open Access Journals (Sweden)

    Aji Dharma Raharjo

    2015-02-01

    Full Text Available Rajegwesi tourism area is one of the significant tourism areas in Meru Betiri National Park, East Java, Indonesia. The area rich in term of biodiversity which are potential for developed as natural tourism attraction.  The aim of this study is to identify snakes species diversity and its distribution in Rajegwesi tourism area. Field survey was done in Rajegwesi area, namely swamps forest, residential area, rice fields, agriculture area (babatan, resort area, and Plengkang cliff. This study found some snakes, encompasses Colubridae (10 species, Elapidae (four species, and Phytonidae (one species. There are Burmese Python (Python reticulatus, Red-necked Keelback (Rhabdophis subminiatus, Painted Bronzeback Snake (Dendrelaphis Pictus, Black Copper Rat Snake (Coelognathus flavolineatus, Radiated Rat Snake (C. radiatus, Striped Keelback (Xenochrophis vittatus, Checkered Keelback (X. piscator, Spotted Ground Snake (Gongyosoma balioderius, Gold-ringed Cat Snake (Boiga dendrophila, Common Wolf Snake (Lycodon capucinus, Banded Wolf snake (L. subcinctus, Cobra (Naja sputatrix, King Cobra (Ophiophagus hannah, Malayan Krait (Bungarus candidus, and Banded Krait (B. fasciatus was found. These snake habitats distributes at 21 coordinate points. Keywords: conservation, ecotourism, snakes.

  15. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  16. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [US Department of Energy, Washington, DC (United States).Office of Legacy Management

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  17. FUDNAMENTAL NOTE OF THE MOTRICAL EDUCATION AREA

    Directory of Open Access Journals (Sweden)

    Dragnea Adrian

    2009-03-01

    of unitary scientific interpretation.b inside the university domain a well put together science(theorymust be fundamented, by the help oflogical argument, taxonomies, research and projective methods, principles and recognized laws.cthe basic instrument (the physical exercisecannot be at the basis of an university domain which is to encompass all forms of motric activity, even if this is part of the “culture” (the key, pincers, screwdriver cannot name areas such as that of technology, for example; d one must differentiate between socially recognized motrical activities (Physical Education, Sport,Kinetotherapy, spare time activities etc and the science or sciences that study them.

  18. Fluid management plan for the Project Shoal Area Offsites Subproject

    International Nuclear Information System (INIS)

    1996-08-01

    The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject's Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria

  19. The Great Barrier Reef World Heritage Area seagrasses: Managing this iconic Australian ecosystem resource for the future

    Science.gov (United States)

    Coles, Robert G.; Rasheed, Michael A.; McKenzie, Len J.; Grech, Alana; York, Paul H.; Sheaves, Marcus; McKenna, Skye; Bryant, Catherine

    2015-02-01

    The Great Barrier Reef World Heritage Area (GBRWHA) includes one of the world's largest areas of seagrass (35,000 km2) encompassing approximately 20% of the world's species. Mapping and monitoring programs sponsored by the Australian and Queensland Governments and Queensland Port Authorities have tracked a worrying decrease in abundance and area since 2007. This decline has almost certainly been the result of a series of severe tropical storms and associated floods exacerbating existing human induced stressors. A complex variety of marine and terrestrial management actions and plans have been implemented to protect seagrass and other habitats in the GBRWHA. For seagrasses, these actions are inadequate. They provide an impression of effective protection of seagrasses; reduce the sense of urgency needed to trigger action; and waste the valuable and limited supply of "conservation capital". There is a management focus on ports, driven by public concerns about high profile development projects, which exaggerates the importance of these relatively concentrated impacts in comparison to the total range of threats and stressors. For effective management of seagrass at the scale of the GBRWHA, more emphasis needs to be placed on the connectivity between seagrass meadow health, watersheds, and all terrestrial urban and agricultural development associated with human populations. The cumulative impacts to seagrass from coastal and marine processes in the GBRWHA are not evenly distributed, with a mosaic of high and low vulnerability areas. This provides an opportunity to make choices for future coastal development plans that minimise stress on seagrass meadows.

  20. 2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Correction Unit 447

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-04-01

    The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.

  1. The research project on technical information basis for aging management in Fukui and Kinki area (2nd report)

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2009-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in 2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experience and results of the participating organizations were considered and the following four topics were extracted. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants. 2) The development of inspection techniques to monitor the initiation and propagation of defects. 3) The development of a guideline for evaluating weld repair methods. 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as of coordinator to make a contracts, facilitate execution, and compile annual reports. In FY2008, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects were related to the second topic (inspection technique) and I subject was related to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  2. The research project on technical information basis for aging management in Fukui and Kinki area. 3rd report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2010-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. (1) The improvement of pipe thinning management in nuclear power plants, (2) The development of inspection techniques to monitor the initiation and propagation of defects, (3) The development of a guideline for evaluating weld repair methods, (4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2009, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  3. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1992-01-01

    A description is given of research activities, concerning heating systems, which were carried out in Sweden during 1991. The main subject areas dealt with under the gas technology group within the area of heating systems were catalytic combustion, polyethylene materials, and gas applications within the paper and pulp industries. A list is given of the titles of project reports published during 1991 and of those begun during that year. Under the Swedish Centre for Gas Technology (SGC), the main areas of research regarding gas applications were polyethylene materials, industrial applications and the reduction of pollutant emissions. A detailed list is given of research projects which were in progress or proposed by March 1992 under the heating system gas technology research group in Sweden. This list also presents the aims and descriptions of the methods, etc. (AB)

  4. BLUECOM+ project: Connecting Humans and Systems at Ocean Remote Areas using Cost-effective Broadband Communications field

    Science.gov (United States)

    Brito, Pedro; Terrinha, Pedro; Magalhães, Vitor; Santos, Joana; Duarte, Débora; Campos, Rui

    2017-04-01

    The BLUECOM + project (Connecting Humans and Systems at Remote Ocean Areas using Cost-effective Broadband Communications) aims at developing an innovative communications solution that will enable broadband, cost-effective Internet access in remote ocean areas (ideally beyond 100 km from shore), using standard wireless access technologies - e.g., Wi-Fi and LTE. BLUECOM+ is an EEA Grants PT02 project developed by INESC TEC (Institute for Systems and Computer Engineering, Technology and Science), IPMA (Portuguese Institute for the Sea and the Atmosphere), and MARLO (Transport and Logistics Consultants). The BLUECOM+ key idea and innovation lies on deploying a long-term communications infrastructure, which will extend broadband communications from shore to remote ocean areas by leveraging (1) Helikites - a combination of a helium balloon and kite - that can be tethered to existing or new land and ocean platforms, (2) long range line of sight wireless communications using TV white spaces, and (3) multi-hop relaying techniques to further increase range. At this stage the communications protocols were defined and tested in lab conditions and two sea trials for demonstration of the system were carried out in July/2016 and September/2016 using research vessels. Results of the cruises: 1st cruise corresponded to the first sea-trials of the project. Single-hop communications were established between a land base station deployed at Cabo Espichel lighthouse and the Sea Station deployed in a Helikite launched from the vessel and flying at an altitude of 120m. Successful communications between the two stations were established at a maximum distance of 40km with a data rate in excess of 1Mbit/s. 2nd cruise corresponded to the second sea-trials. During this trial single-hop and two-hop land-sea communications were tested. For two-hop communications tests two Helikites were launched at 120m from two vessels. The first was launched from a vessel closer to shore; the other was

  5. "India Population Projects" in Karnataka.

    Science.gov (United States)

    Reddy, P H; Badari, V S

    1991-12-01

    An overview, objectives, implementation, and research and evaluation studies of 2 India Population Projects in Karnataka are presented. The India Population Project I (IPP-I) was conducted in Karnataka and Uttar Pradesh. India Population Project III (IPP-III) took place between 1984-92 in 6 districts of Karnataka: Belgaum, Bijapur, Dharwad, Bidar, Gulbarga, and Raichur, and 4 districts in Kerala. The 6 districts in Karnataka accounted for 36% (13.2 million) of the total national population. The project cost was Rs. 713.1 million which was shared by the World Bank, and the Indian national and regional government. Due to poor past performance, these projects were undertaken to improve health and family welfare status. Specific project objectives are outlined. IPP-I included an urban component, and optimal Government of India program, and an intensive rural initiative. The urban program aimed to improved pre- and postnatal services and facilities, and the family planning (FP) in Bangalore city. The rural program was primarily to provide auxiliary nurse-midwives and hospitals and clinics, and also supplemental feeding program for pregnant and nursing mothers and children up to 2 years. The government program provided FP staff and facilities. IPP-I had 3 units to oversee building construction, to recruit staff and provide supplies and equipment, and to establish a Population Center. IPP-III was concerned with service delivery; information, education, and communication efforts (IEC) and population education; research and evaluation; and project management. Both projects contributed significantly to improving the infrastructure. A brief account of the types and kinds of studies undertaken is given. Studies were grouped into longitudinal studies of fertility, mortality, and FP; management information and evaluation systems for health and family welfare programs; experimental strategies; and other studies. Research and evaluation studies in IPP-III encompassed studies in

  6. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  7. The logic of single-cell projections from visual cortex.

    Science.gov (United States)

    Han, Yunyun; Kebschull, Justus M; Campbell, Robert A A; Cowan, Devon; Imhof, Fabia; Zador, Anthony M; Mrsic-Flogel, Thomas D

    2018-04-05

    Neocortical areas communicate through extensive axonal projections, but the logic of information transfer remains poorly understood, because the projections of individual neurons have not been systematically characterized. It is not known whether individual neurons send projections only to single cortical areas or distribute signals across multiple targets. Here we determine the projection patterns of 591 individual neurons in the mouse primary visual cortex using whole-brain fluorescence-based axonal tracing and high-throughput DNA sequencing of genetically barcoded neurons (MAPseq). Projections were highly diverse and divergent, collectively targeting at least 18 cortical and subcortical areas. Most neurons targeted multiple cortical areas, often in non-random combinations, suggesting that sub-classes of intracortical projection neurons exist. Our results indicate that the dominant mode of intracortical information transfer is not based on 'one neuron-one target area' mapping. Instead, signals carried by individual cortical neurons are shared across subsets of target areas, and thus concurrently contribute to multiple functional pathways.

  8. ENSAR, a Nuclear Science Project for European Research Area

    NARCIS (Netherlands)

    Turzó, Ketel; Lewitowicz, Marek; Harakeh, Muhsin N.

    2015-01-01

    During the period from September 2010 to December 2014, the European project European Nuclear Science and Applications Research (ENSAR) coordinated research activities of the Nuclear Physics community performing research in three major subfields: Nuclear Structure, Nuclear Astrophysics, and Nuclear

  9. A network of genes, genetic disorders, and brain areas.

    Directory of Open Access Journals (Sweden)

    Satoru Hayasaka

    Full Text Available The network-based approach has been used to describe the relationship among genes and various phenotypes, producing a network describing complex biological relationships. Such networks can be constructed by aggregating previously reported associations in the literature from various databases. In this work, we applied the network-based approach to investigate how different brain areas are associated to genetic disorders and genes. In particular, a tripartite network with genes, genetic diseases, and brain areas was constructed based on the associations among them reported in the literature through text mining. In the resulting network, a disproportionately large number of gene-disease and disease-brain associations were attributed to a small subset of genes, diseases, and brain areas. Furthermore, a small number of brain areas were found to be associated with a large number of the same genes and diseases. These core brain regions encompassed the areas identified by the previous genome-wide association studies, and suggest potential areas of focus in the future imaging genetics research. The approach outlined in this work demonstrates the utility of the network-based approach in studying genetic effects on the brain.

  10. Evaluation of qualitative value for money of public-private partnership projects in Vietnam

    Directory of Open Access Journals (Sweden)

    Dinh Thi Thuy Hang

    2017-12-01

    Full Text Available It is expected that in the period of 2011-2020 projects under the model of public- private partnership (PPP in Vietnam will continue to increase in both number and volume of financing. Despite the substantial volumes of the already performed investments, many practitioners in the field question the viability of Vietnamese PPP projects, in the road sector in particular. Enhancing the viability of these projects is, therefore, vital in the context of the ongoing economic growth. This research is proposing a qualitative value for money assessment, in order to examine the factors influencing PPP projects’ viability in Vietnam. Employing the method of Structural Equation Modeling, the following two aspects will be included in the analysis: 1 financial performance & economic environment; 2 technical capacity & legal environment. The former encompasses “financial interest”, “profitability”, “economic policy” and “demand of service”; while the latter covers “service quality”, “flexibility of contracts”, “legal framework” and “statutory compliance”.

  11. The ARCHER project (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D)

    Energy Technology Data Exchange (ETDEWEB)

    Knol, S., E-mail: knol@nrg.eu [Nuclear Research and consultancy Group (NRG), PO Box 25, NL-1755 ZG Petten (Netherlands); Fütterer, M.A. [Joint Research Centre, Institute for Energy, Petten (Netherlands); Roelofs, F. [Nuclear Research and consultancy Group (NRG), PO Box 25, NL-1755 ZG Petten (Netherlands); Kohtz, N. [TÜV Rheinland, Köln (Germany); Laurie, M. [Joint Research Centre, Institute for Transuranium elements, Karlsruhe (Germany); Buckthorpe, D. [UMAN, University of Manchester, Manchester (United Kingdom); Scheuermann, W. [IKE, Stuttgart University, Stuttgart (Germany)

    2016-09-15

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European framework programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project has finished, and the paper comprises an overview of the achievements of the project.

  12. Assessment and restoring soil functionality in degraded areas of organic vineyards. The preliminary results of the ReSolVe project in Italy

    Science.gov (United States)

    Priori, Simone; Agnelli, Alessandro; Castaldini, Maurizio; D'Avino, Lorenzo; D'Errico, Giada; Gagnarli, Elena; Giudi, Silvia; Goggioli, Donatella; Lagomarsino, Alessandra; Landi, Silvia; Leprini, Marco; Pellegrini, Sergio; Perria, Rita; Puccioni, Sergio; Simoni, Sauro; Storchi, Paolo; Valboa, Giuseppe; Zombardo, Alessandra; Costantini, Edoardo

    2016-04-01

    In both conventional and organic Italian vineyards, it is quite common to have areas characterized by problems in vine health, grape production and quality, often caused by improper land preparation before vine plantation and/or management. Causes for soil malfunctioning can include: reduced contribution of the soil fauna to the ecosystem services (i.e. nutrient cycles), poor organic matter content, imbalance of some element ratio, altered pH, water deficiency, soil compaction and/or scarce oxygenation. ReSolVe is a transnational and interdisciplinary 3-years research project aimed at testing the effects of selected organic strategies for restoring optimal soil functionality in degraded areas within vineyard. The different restoring strategies implemented in each plot will be: i) compost produced on farm by manure + pruning residue + grass, ii) faba bean and barley green manure, iii) sowing and dry mulching with Trifolium squarrosum L. During two years of such treatments, the trend of the soil features and the grapevine status will be monitored in detail, to reveal the positive and negative effects of such treatments. The project involves 8 research groups in 6 different EU countries (Italy, France, Spain, Sweden, Slovenia, and Turkey), with experts from several disciplines, including soil science, ecology, microbiology, grapevine physiology, viticulture, and biometry. The experimental vineyards are situated in Italy (Chianti hills and Maremma plain, Tuscany), France (Bordeaux and Languedoc), Spain (La Rioja) and Slovenia (Primorska) for winegrape, and in Turkey (Adana and Mersin) for table grape. Soil features before implementing restoring strategies showed lower content of soil organic matter and enzyme activities, and higher carbonates in degraded areas than in the non-degraded areas. The Biological Soil Quality values of microarthropods were always high, in comparison with data registered in similarly managed vineyards or stable ecosystems, and the data showed

  13. N Area Post-Deactivation ALARA Report

    International Nuclear Information System (INIS)

    Nellesen, A. L.

    1998-01-01

    This report provides information about a wide range of radiological work activities at the N Area Deactivation Project. The report is divided into sections that are based on specific N Area scopes of work. Each section contains specific information that was of significant radiological importance in completing N Area Deactivation work. The information presented in this report may be applicable and beneficial to similar projects throughout the U.S. Department of Energy (DOE) complex, and in commercial industry

  14. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  15. Youthification in the Metropolitan Area of Cluj

    Directory of Open Access Journals (Sweden)

    Vlad Cocheci

    2018-06-01

    Full Text Available This research exercise aims to identify all areas affected by what is now known as ‘youthification’ in the Metropolitan Area of Cluj. Broadly speaking, an area touched by youthification witnesses a massive arrival of young adults, who invest in housing, but only remain there until they age. Youthification is usually the second phase within an encompassing process of gentrification. To gain a clearer picture of this phenomenon, we employed a snapshot of the situation recorded by the Population and Housing Census of 2011. Using this image as a starting point, we then applied statistical thresholds aimed at measuring the presence and intensity of youthification within different areas. Thereafter, we looked at areas exhibiting the same level of youthification, in order to find those common traits of their young adult inhabitants that might prove relevant for their choices in matters of housing. Once completed, our efforts resulted in the first map showing the areas affected by youthification within the Metropolitan Area of Cluj. In addition, we reached the following conclusion: Young adults who live in the city are more likely to still be enrolled in a form of education and less likely to be married or to have children than those who live in the suburbs or in rural areas. This observation implies that there might be some hidden dependency relations, which are at work in shaping the choice of housing.

  16. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Monitor-Hot Creek Rangeland Project AGENCY: Forest... Rangeland Project area. The analysis will determine if a change in management direction for livestock grazing is needed to move existing resource conditions within the Monitor-Hot Creek Rangeland Project area...

  17. CHALLENGING PROJECTS OF TEACHING ACTIVITIES IN SPEAKING CLASS

    Directory of Open Access Journals (Sweden)

    Teguh Sarosa

    2017-04-01

    Full Text Available This paper proposes an alternative way of teaching speaking through challenging classroom activities. The abundant number of teaching techniques in speaking skill designed by linguists and English practitioners make English second-language teachers exultant in searching and designing classroom activities. Since teaching speaking could do with accuracy and fluency, teachers should provide a conducive atmosphere for students’ free will in expressing their thoughts without being afraid of making mistakes as well as a favorable condition for fostering students’ correctness in producing utterances. Designing challenging projects which encompass interactive activities can be used as an alternative model for developing learners’ fluency and repetitive doings can be used for fostering learners’ accuracy. Interactive activities involving information gap demand the second-language learners’ critical thinking in organizing the logical relationships among ideas, the soundness of evidence, and the differences between fact and opinion in order to keep the communication flows. Whereas the repetitive doings help second-language learners in producing appropriate utterances. Besides, the project upshots contribute contentments to students in appreciating theirs collaborative efforts.

  18. Conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation, 1945--1947. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-12-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the U.S. Department of Energy`s (DOE) Hanford Site near Richland, Washington. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories (BNW). One of the radionuclides emitted that would affect the radiation dose was iodine-131. This report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947.

  19. Students Development of Food and Health-Related Action Competence - Upscaling LOMA Project

    DEFF Research Database (Denmark)

    Ruge, Dorte; Nielsen, Morten Kromann; Jensen, Kirsten

    , based on preliminary results from LOMA I project, there are indications, that students at the whole school develop healthier eating habits and experience comensality, Sense of Coherence and QOL, when they participate in LOMA educational activities. The evaluation of LOMA II will apply a mixed methods......, that encompass participation from both teachers, pedagogs and students (8-15 years) and teacher-students.The evaluation of LOMA II will apply a mixed methods design, that facilitates a 'realist' (Pawson and Tilley 1998; Carlsson and Simovska 2012) approach to data collection and analysis. Apart from more...... mainstream methods of measurement, action research strategies (Checkland 2000) will be applied at certain stages of the evaluation, e.g. during pilot-projets and in relation to students participation in the 'mid-term-seminar' of the project in 2016. Expected Outcomes It is expected, that LOMA II...

  20. Teacher/Intern Partnerships in Isolated Areas: A Project Overview.

    Science.gov (United States)

    Yarrow, Allan; Ballantyne, Roy; Hansford, Brian; Herschell, Paul; Millwater, Jan

    1998-01-01

    Describes a collaborative project designed to better prepare Australian preservice teachers for teaching in remote schools through six-week rural mentorship programs and joint preservice and inservice professional development. Discusses how development of partnerships among cooperating institutions and between teachers, student teachers, and the…

  1. Subproject L-045H 300 Area Treated Effluent Disposal Facility

    International Nuclear Information System (INIS)

    1991-06-01

    The study focuses on the project schedule for Project L-045H, 300 Area Treated Effluent Disposal Facility. The 300 Area Treated Effluent Disposal Facility is a Department of Energy subproject of the Hanford Environmental Compliance Project. The study scope is limited to validation of the project schedule only. The primary purpose of the study is to find ways and means to accelerate the completion of the project, thereby hastening environmental compliance of the 300 Area of the Hanford site. The ''300 Area'' has been utilized extensively as a laboratory area, with a diverse array of laboratory facilities installed and operational. The 300 Area Process Sewer, located in the 300 Area on the Hanford Site, collects waste water from approximately 62 sources. This waste water is discharged into two 1500 feet long percolation trenches. Current environmental statutes and policies dictate that this practice be discontinued at the earliest possible date in favor of treatment and disposal practices that satisfy applicable regulations

  2. Deletion 1q43 encompassing only CHRM3 in a patient with autistic disorder.

    Science.gov (United States)

    Petersen, Andrea Klunder; Ahmad, Ausaf; Shafiq, Mustafa; Brown-Kipphut, Brigette; Fong, Chin-To; Anwar Iqbal, M

    2013-02-01

    Deletions on the distal portion of the long arm of chromosome 1 result in complex and highly variable clinical phenotypes which include intellectual disability, autism, seizures, microcephaly/craniofacial dysmorphology, corpus callosal agenesis/hypogenesis, cardiac and genital anomalies, hand and foot abnormalities and short stature. Genotype-phenotype correlation reported a minimum region of 2 Mb at 1q43-q44. We report on a 3 ½ year old male patient diagnosed with autistic disorder who has social withdrawal, eating problems, repetitive stereotypic behaviors including self-injurious head banging and hair pulling, and no seizures, anxiety, or mood swings. Array comparative genomic hybridization (aCGH) showed an interstitial deletion of 473 kb at 1q43 region (239,412,391-239,885,394; NCBI build37/hg19) harboring only CHRM3 (Acetylcholine Receptor, Muscarinic, 3; OMIM: 118494). Recently, another case with a de novo interstitial deletion of 911 kb at 1q43 encompassing three genes including CHRM3 was reported. The M3 muscarinic receptor influences a multitude of central and peripheral nervous system processes via its interaction with acetylcholine and may be an important modulator of behavior, learning and memory. We propose CHRM3 as a candidate gene responsible for our patient's specific phenotype as well as the overlapping phenotypic features of other patients with 1q43 or 1q43-q44 deletions. Copyright © 2013. Published by Elsevier Masson SAS.

  3. Blue ocean strategy application in the course of planning and implementation of construction projects in the area of SMART housing and social infrastructure

    Directory of Open Access Journals (Sweden)

    Orlov Alexandr K.

    2017-01-01

    Full Text Available This paper deals with approaches to the analysis of competitiveness in the construction field. The methodology of blue ocean strategy was analyzed. Based on the conducted analysis a set of measures related to blue ocean strategy application in the course of planning and implementation of construction projects in the area of SMART housing and social infrastructure was developed. Implementation of the proposed methodological provisions will allow improving investment efficiency in the course of construction projects implementation and enhancing the competitive ability of the developer.

  4. Chapter 14: Chiller Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, Charles W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tiessen, Alex [Posterity Group, Ottawa, ON (Canada)

    2017-10-06

    This protocol defines a chiller measure as a project that directly impacts equipment within the boundary of a chiller plant. A chiller plant encompasses a chiller - or multiple chillers - and associated auxiliary equipment. This protocol primarily covers electric-driven chillers and chiller plants. It does not include thermal energy storage and absorption chillers fired by natural gas or steam, although a similar methodology may be applicable to these chilled water system components.

  5. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  6. Magnitude and Rupture Area Scaling Relationships of Seismicity at The Northwest Geysers EGS Demonstration Project

    Science.gov (United States)

    Dreger, D. S.; Boyd, O. S.; Taira, T.; Gritto, R.

    2017-12-01

    Enhanced Geothermal System (EGS) resource development requires knowledge of subsurface physical parameters to quantify the evolution of fracture networks. Spatio-temporal source properties, including source dimension, rupture area, slip, rupture speed, and slip velocity of induced seismicity are of interest at The Geysers geothermal field, northern California to map the coseismic facture density of the EGS swarm. In this investigation we extend our previous finite-source analysis of selected M>4 earthquakes to examine source properties of smaller magnitude seismicity located in the Northwest Geysers Enhanced Geothermal System (EGS) demonstration project. Moment rate time histories of the source are found using empirical Green's function (eGf) deconvolution using the method of Mori (1993) as implemented by Dreger et al. (2007). The moment rate functions (MRFs) from data recorded using the Lawrence Berkeley National Laboratory (LBNL) short-period geophone network are inverted for finite-source parameters including the spatial distribution of fault slip, rupture velocity, and the orientation of the causative fault plane. The results show complexity in the MRF for the studied earthquakes. Thus far the estimated rupture area and the magnitude-area trend of the smaller magnitude Geysers seismicity is found to agree with the empirical relationships of Wells and Coppersmith (1994) and Leonard (2010), which were developed for much larger M>5.5 earthquakes worldwide indicating self-similar behavior extending to M2 earthquakes. We will present finite-source inversion results of the micro-earthquakes, attempting to extend the analysis to sub Mw, and demonstrate their magnitude-area scaling. The extension of the scaling laws will then enable the mapping of coseismic fracture density of the EGS swarm in the Northwest Geysers based on catalog moment magnitude estimates.

  7. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001; Forschung, Entwicklung und Demonstration im Bereich der Energie in der Schweiz. Liste der Projekte 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report.

  8. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  9. The ANTARES project

    International Nuclear Information System (INIS)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J.J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P.E.; Bland, R.W.; Blondeau, F.; Botton, N. de; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P.H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J.J.; Dispau, G.; Duval, P.Y.; Engelen, J.; Feinstein, F.; Flores, E.C.; Fopma, J.; Fuda, J.L.; Goret, P.; Gosset, L.; Gournay, J.F.; Hernandez, J.J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J.C.; Laugier, J.P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J.P; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J.

    1999-01-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described

  10. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  11. 24 CFR 266.200 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... being collected at unassisted projects in the market area that are similar in amenities and location to... assistance agreement or the unit rents being collected at unassisted projects in the market that are similar... in § 266.5. (g) Elderly projects. Projects or parts of projects specifically designed for the use and...

  12. Consortium biology in immunology: the perspective from the Immunological Genome Project.

    Science.gov (United States)

    Benoist, Christophe; Lanier, Lewis; Merad, Miriam; Mathis, Diane

    2012-10-01

    Although the field has a long collaborative tradition, immunology has made less use than genetics of 'consortium biology', wherein groups of investigators together tackle large integrated questions or problems. However, immunology is naturally suited to large-scale integrative and systems-level approaches, owing to the multicellular and adaptive nature of the cells it encompasses. Here, we discuss the value and drawbacks of this organization of research, in the context of the long-running 'big science' debate, and consider the opportunities that may exist for the immunology community. We position this analysis in light of our own experience, both positive and negative, as participants of the Immunological Genome Project.

  13. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  14. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  15. Area-averaged surface fluxes and their time-space variability over the FIFE experimental domain

    Science.gov (United States)

    Smith, E. A.; Hsu, A. Y.; Crosson, W. L.; Field, R. T.; Fritschen, L. J.; Gurney, R. J.; Kanemasu, E. T.; Kustas, W. P.; Nie, D.; Shuttleworth, W. J.

    1992-01-01

    The underlying mean and variance properties of surface net radiation, sensible-latent heat fluxes and soil heat flux are studied over the densely instrumented grassland region encompassing FIFE. Flux variability is discussed together with the problem of scaling up to area-averaged fluxes. Results are compared and contrasted for cloudy and clear situations and examined for the influence of surface-induced biophysical controls (burn and grazing treatments) and topographic controls (aspect ratios and slope factors).

  16. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    Energy Technology Data Exchange (ETDEWEB)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate the facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.

  17. NSWEP: The Nova Scotia Wind Energy Project

    International Nuclear Information System (INIS)

    Hughes, L.; Little, T. A.

    2000-01-01

    A two-phase project, intended to educate Nova Scotians about the potential of wind power to help reduce the province's greenhouse gas emissions, thereby fulfilling a vital role in Canada's effort to mitigate climate change effects, is described. First phase of the project involves gathering of wind data; the second the installation of a number of wind turbines throughout the province. The data gathering phase encompasses site selection, the actual data gathering for a period of about ten months, data analysis, and creation of a four or five module educational program, to be linked with intermediate high school science, mathematics, geography and social studies curriculum objectives to provide an interdisciplinary examination of these topics, and convey a sense of the complexity of the issues involved. The second phase of the project is intended to promote the possible use of wind energy in the province by installing a number of 25 kW wind turbines at selected sites throughout the province, followed by the gathering analysis of data relating to the amount of power produced by the turbines, calculating the efficiency of turbines and comparing data with the data gathered in previous years. The project is expected to last at least five years, exposing about 4000 high school students to hands-on involvement with issues of climate change and sustainable energy. Parents and the community will be exposed to these same issues indirectly, aided by the relative proximity of the weather stations to schools and the strategic location of the wind turbines. 4 refs

  18. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  19. Project management plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service

  20. 300 Area Disturbance Report

    Energy Technology Data Exchange (ETDEWEB)

    LL Hale; MK Wright; NA Cadoret

    1999-01-07

    black and white photographs provide a partial record of some excavations, including trenches, building basements, and material lay-down yards. Estimates of excavation depth and width can be made, but these estimates are not accurate enough to pinpoint the exact location where the disturbedhmdisturbed interface is located (e.g., camera angles were such that depths and/or widths of excavations could not be accurately determined or estimated). In spite of these limitations, these photographs provide essential information. Aerial and historic low-level photographs have captured what appears to be backfill throughout much of the eastern portion of the 300 Area-near the Columbia River shoreline. This layer of fill has likely afforded some protection for the natural landscape buried beneath the fill. This assumption fits nicely with the intermittent and inadvertent discoveries of hearths and stone tools documented through the years in this part of the 300 Area. Conversely, leveling of sand dunes appears to be substantial in the northwestern portion of the 300 Area during the early stages of development. o Project files and engineer drawings do not contain information on any impromptu but necessary adjustments made on the ground during project implementation-after the design phase. Further, many projects are planned and mapped but never implemented-this information is also not often placed in project files. Specific recommendations for a 300 Area cultural resource monitoring strategy are contained in the final section of this document. In general, it is recommended that monitoring continue for all projects located within 400 m of the Columbia River. The 400-m zone is culturally sensitive and likely retains some of the most intact buried substrates in the 300 Area.

  1. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  2. Preliminary investigation Area 12 fleet operations steam cleaning discharge area Nevada Test Site

    International Nuclear Information System (INIS)

    1996-07-01

    This report documents the characterization activities and findings of a former steam cleaning discharge area at the Nevada Test Site. The former steam cleaning site is located in Area 12 east of Fleet Operations Building 12-16. The characterization project was completed as a required condition of the ''Temporary Water Pollution Control Permit for the Discharge From Fleet Operations Steam Cleaning Facility'' issued by the Nevada Division of Environmental Protection. The project objective was to collect shallow soil samples in eight locations in the former surface discharge area. Based upon field observations, twelve locations were sampled on September 6, 1995 to better define the area of potential impact. Samples were collected from the surface to a depth of approximately 0.3 meters (one foot) below land surface. Discoloration of the surface soil was observed in the area of the discharge pipe and in localized areas in the natural drainage channel. The discoloration appeared to be consistent with the topographically low areas of the site. Hydrocarbon odors were noted in the areas of discoloration only. Samples collected were analyzed for bulk asbestos, Toxicity Characteristic Leaching Procedure (TCLP) metals, total petroleum hydrocarbons (TPHs), volatile organic compounds (VOCs), semi-volatile organic compounds (Semi-VOCs), and gamma scan

  3. Addressing Organisational Pressures as Drivers towards Sustainability in Manufacturing Projects and Project Management Methodologies

    Directory of Open Access Journals (Sweden)

    Fotios Misopoulos

    2018-06-01

    Full Text Available The concept of sustainability continues to rapidly grow in interest from disparate academic and industrial fields. This research aims to elucidate further the implications of the sustainability drivers upon project management methodological approaches specifically in the manufacturing industry. This paper studies the three prevalent dialogues in the field of sustainability, relevant to the environmental and social aspects of the Triple Bottom Line, and utilises Institutional Theory to propose organisational pressures as affecting sustainability efforts in industrial manufacturing project management. Furthermore, the literature bodies of Lean and Life Cycle Analysis in manufacturing project management guided our reflection that the various drivers of sustainability put forward that do not consider the distinctive organisational pressures fail to address institutional and systemic project management issues holistically. The authors further conduct and draw on a systematic literature review on the constructs of sustainability in the manufacturing industry and their adopted methodologies, evaluating academic articles published from the year 2001 to 2017. The findings indicate that normative pressures prevail over coercive and mimetic pressures and are seen as the main drivers of sustainability in the manufacturing industry. In an incremental reductionist approach, project management knowledge areas are analysed, and the study posits that Stakeholder and Communications Management are two of the knowledge areas that need to integrate the above pressures to achieve cohesive sustainable industrial results. The principle contribution is to offer a new conceptual perspective on integrating project management knowledge areas with Institutional Theory pressures for more sustainable project management methodologies.

  4. Interim report on Tanjung Enim IV coal exploration project. South Arahan area (1998/1999)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The exploration project in Indonesia covered geological mapping, drilling, geophysical logging, underground water pumping tests, vertical seismic profiling (VSP), and seismic reflection survey. Ten boreholes were drilled. Moreover, coal property analysis, geotechnical rock test, geochemical analysis, and the like were conducted by examining core specimens sampled from the boreholes. It was found that there are three main coal beds which continuously extend to the two ends of the synclinic structure. It was also found that there is a 6m-thick coal bed 200m further below the three main coal beds, and it is estimated to produce approximately 6,000kcal/kg. Coal from two of the three beds produces 5,000kcal/kg, containing but a little ash and sulfur. Coal from the third includes 1.17% of sulfur. Coal in all the beds is summed up, and then it is estimated that there is approximately 1,054-million tons of coal in reserve in the South Arahan area. (NEDO)

  5. An aerial radiological survey of Project Gasbuggy and surrounding area, Rio Arriba County, New Mexico. Date of survey: October 27, 1994

    International Nuclear Information System (INIS)

    1995-08-01

    An aerial radiological survey was conducted over the Project Gasbuggy site, 55 miles (89 kilometers) east of Farmington, New Mexico, on October 27, 1994. Parallel lines were flown at intervals of 300 feet (91 meters) over a 16-square-mile (41-square-kilometer) area at a 150-foot (46-meter) altitude centered on the Gasbuggy site. The gamma energy spectra obtained were reduced to an exposure rate contour map overlaid on a high altitude aerial photograph of the area. The terrestrial exposure rate varied from 14 to 20 microR/h at 1 meter above ground level. No anomalous or man-made isotopes were found

  6. Honey Lake Geothermal Project, Lassen County, California

    Science.gov (United States)

    1984-11-01

    The drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel is reported. The project is located within the Wendel-Amedee Known Geothermal Resource Area.

  7. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001; Liste des projets 2000/2001: recherche, developpement et demonstration dans le domaine de l'energie en Suisse

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report.

  8. Project B-589, 300 Area transuranic waste interim storage project engineering study

    International Nuclear Information System (INIS)

    Greenhalgh, W.O.

    1985-08-01

    The purpose of the study was to look at various alternatives of taking newly generated, remote-handled transuranic waste (caisson waste) in the 300 Area, performing necessary transloading operations and preparing the waste for storage. The prepared waste would then be retrieved when the Waste Isolation Pilot Plant becomes operational and transshipped to the repository in New Mexico with a minimum of inspection and packaging. The scope of this study consisted of evaluating options for the transloading of the TRU wastes for shipment to a 200 Area storage site. Preconceptual design information furnished as part of the engineering study is listed below: produce a design for a clean, sealed waste canister; hot cell loadout system for the waste; in-cell loading or handling equipment; determine transshipment cask options; determine assay system requirements (optional); design or specify transport equipment required; provide a SARP cost estimate; determine operator training requirements; determine waste compaction equipment needs if desirable; develop a cost estimate and approximate schedule for a workable system option; and update the results presented in WHC Document TC-2025

  9. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001; Forschung, Entwicklung und Demonstration im Bereich der Energie in der Schweiz. Liste der Projekte 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report.

  10. Exploiting Open Environmental Data using Linked Data and Cloud Computing: the MELODIES project

    Science.gov (United States)

    Blower, Jon; Gonçalves, Pedro; Caumont, Hervé; Koubarakis, Manolis; Perkins, Bethan

    2015-04-01

    The European Open Data Strategy establishes important new principles that ensure that European public sector data will be released at no cost (or marginal cost), in machine-readable, commonly-understood formats, and with liberal licences enabling wide reuse. These data encompass both scientific data about the environment (from Earth Observation and other fields) and other public sector information, including diverse topics such as demographics, health and crime. Many open geospatial datasets (e.g. land use) are already available through the INSPIRE directive and made available through infrastructures such as the Global Earth Observation System of Systems (GEOSS). The intention of the Open Data Strategy is to stimulate the growth of research and value-adding services that build upon these data streams; however, the potential value inherent in open data, and the benefits that can be gained by combining previously-disparate sources of information are only just starting to become understood. The MELODIES project (Maximising the Exploitation of Linked Open Data In Enterprise and Science) is developing eight innovative and sustainable services, based upon Open Data, for users in research, government, industry and the general public in a broad range of societal and environmental benefit areas. MELODIES (http://melodiesproject.eu) is a European FP7 project that is coordinated by the University of Reading and has sixteen partners (including nine SMEs) from eight European countries. It started in November 2013 and will run for three years. The project is therefore in its early stages and therefore we will value the opportunity that this workshop affords to present our plans and interact with the wider Linked Geospatial Data community. The project is developing eight new services[1] covering a range of domains including agriculture, urban ecosystems, land use management, marine information, desertification, crisis management and hydrology. These services will combine Earth

  11. Sapwood area - leaf area relationships for coast redwood

    OpenAIRE

    Stancioiu, P T; O'Hara, K L

    2005-01-01

    Coast redwood (Sequoia sempervirens (D. Don) Endl.) trees in different canopy strata and crown positions were sampled to develop relationships between sapwood cross-sectional area and projected leaf area. Sampling occurred during the summers of 2000 and 2001 and covered tree heights ranging from 7.7 to 45.2 m and diameters at breast height ranging from 9.4 to 92.7 cm. Foliage morphology varied greatly and was stratified into five types based on needle type (sun or shade) and twig color. A str...

  12. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Science.gov (United States)

    Prandi, F.; Magliocchetti, D.; Poveda, A.; De Amicis, R.; Andreolli, M.; Devigili, F.

    2016-06-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas) project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  13. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Directory of Open Access Journals (Sweden)

    F. Prandi

    2016-06-01

    Full Text Available Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  14. 32 CFR 644.3 - Navigation Projects.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Navigation Projects. 644.3 Section 644.3 National... HANDBOOK Project Planning Civil Works § 644.3 Navigation Projects. (a) Land to be acquired in fee. All... construction and borrow areas. (3) In navigation-only projects, the right to permanently flood should be...

  15. Salt Lake City Area Integrated Projects electric power marketing final environmental impact statement. Volume 4: Appendixes B-D

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alter native

  16. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 2: Sections 1--16

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  17. European region case study the ethos project for post-accident rehabilitation in the area of belarus contaminated by the Chernobyl disaster

    International Nuclear Information System (INIS)

    Paterson, J.

    2004-01-01

    As the worst civilian nuclear accident, the Chernobyl disaster presented the authorities first in the Soviet Union and then in the independent republics with an unprecedented problem. Strenuous and costly efforts were made to limit the effects of the accident and then to cope with the evacuation or rehabilitation as appropriate of the contaminated areas. By the mid-1990's, however, there was increasing evidence that the problems were over-taxing traditional responses. Into this context, a French team of specialists from a range of disciplines entered with a view to attempting improvements, but without preconceived ideas of what they would do or how they would do it. Beginning by listening to the people of the area of Belarus selected for the so-called ETHOS project, they discovered a profound distrust of the authorities and experts born of the perceived shortcomings of the official responses to the problems to date. They thus worked in close co-operation with the people both to identify the problems that concerned them and to develop solutions that took account of local opportunities and constraints. This interim report on a case study examining the ETHOS project is based on interviews with a wide range of people in the area of the project. It presents the problems identified by interviewees with the initial responses of the authorities and then their assessment of the ETHOS approach. The overall finding is that where public confidence has been lost in the context of an event such as the Chernobyl disaster, the authorities need to make a special effort to establish trust to a point where confidence returns. Traditional top-down responses appear to have exacerbated and reinforced the loss of confidence in this case whereas the approach of the ETHOS team appears to have succeeded in building trust to a significant degree - perhaps even to a point where there may be evidence that confidence is returning. (author)

  18. Options for the management of Chernobyl-restricted areas in England and Wales

    International Nuclear Information System (INIS)

    Nisbet, A.; Woodman, R.

    1999-01-01

    Areas in England and Wales are still subject to restrictions on tile movement, sale and slaughter of sheep because concentrations of radiocaesium in sheep meat may exceed the 1000 Bq kg -1 limit imposed after the Chernobyl nuclear power plant accident. Various monitoring programmes have been implemented to enable lamb production to be sustained in these restricted areas, although no alternative management strategies have been considered to date. Current management practices have been reviewed and costed. An assessment has also been undertaken to establish the practicability and cost effectiveness of five alternative management options. The practicability of each option, which encompasses technical feasibility, capacity, cost, impact and acceptability, was assessed through a series of case studies carried out on farms in the restricted area of north Wales, and through consultation with a range of organisations with interests in farming and/or the environment. Recommendations are made for the future management of the restricted areas in England and Wales. (author)

  19. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  20. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  1.   Transformation of the industrial harbor areas to housing areas

    DEFF Research Database (Denmark)

    Rehder, Meike

    2009-01-01

    Research question: How to read the universal (understood as the common and the social) and the individual (understood as the specific, private and intimate) in the meeting between urban and housing space? Questions in the project: How do the exterior spaces in these new harbour areas come to being......? What influences are at play in the development of them? What influences the approval and the functioning of these housing areas?...

  2. Aurora Mine project - historical resources baseline study

    International Nuclear Information System (INIS)

    Reeves, B.

    1996-01-01

    This volume contains the results of a base line archaeological study of the Aurora Mine Project local study area. It was compiled in support of Syncrude Canada's application to the Alberta Energy and Utilities Board (AEUB) and Alberta Environmental Protection to construct and operate it new Aurora Mine, located northeast of Fort McMurray, Alberta. The objective of this study was to compile, consolidate, review and analyze the reports for the area compiled over the past 22 years in and adjacent to the local study area (LSA), particularly those of now existing and Syncrude projects, and previously proposed Alsands and OSLO projects. The report is a summary of the human history in the area including pre-contact native archaeological sites, past archaeological studies, the Hinterland site pattern, post-contact native traditional sites, oil sands exploration/development related sites and paleontological sites in the subject area, and areas adjacent to it. 150 refs., 5 tabs., 43 figs

  3. Bali beach conservation project and issues related to beach maintenance after completion of project

    OpenAIRE

    Onaka, S.; Endo, S.; Uda, T.

    2013-01-01

    Bali Island in Indonesia is a world-famous resort area, and the beaches composed of coral sand are one of the most important resources for tourism. However, serious beach erosion has occurred since the 1970s owing to the tourism development along the coastal areas. To recover previous natural sandy beaches, Bali Beach Conservation Project was undertaken by the Indonesian Government as the ODA project financed by Japan. Three seriously eroded beaches (Sanur, Nusa Dua and Kuta) with a total len...

  4. Projected cryospheric and hydrological impacts of 21st century climate change in the Ötztal Alps (Austria) simulated using a physically based approach

    Science.gov (United States)

    Hanzer, Florian; Förster, Kristian; Nemec, Johanna; Strasser, Ulrich

    2018-03-01

    A physically based hydroclimatological model (AMUNDSEN) is used to assess future climate change impacts on the cryosphere and hydrology of the Ötztal Alps (Austria) until 2100. The model is run in 100 m spatial and 3 h temporal resolution using in total 31 downscaled, bias-corrected, and temporally disaggregated EURO-CORDEX climate projections for the representative concentration pathways (RCPs) 2.6, 4.5, and 8.5 scenarios as forcing data, making this - to date - the most detailed study for this region in terms of process representation and range of considered climate projections. Changes in snow coverage, glacierization, and hydrological regimes are discussed both for a larger area encompassing the Ötztal Alps (1850 km2, 862-3770 m a.s.l.) as well as for seven catchments in the area with varying size (11-165 km2) and glacierization (24-77 %). Results show generally declining snow amounts with moderate decreases (0-20 % depending on the emission scenario) of mean annual snow water equivalent in high elevations (> 2500 m a.s.l.) until the end of the century. The largest decreases, amounting to up to 25-80 %, are projected to occur in elevations below 1500 m a.s.l. Glaciers in the region will continue to retreat strongly, leaving only 4-20 % of the initial (as of 2006) ice volume left by 2100. Total and summer (JJA) runoff will change little during the early 21st century (2011-2040) with simulated decreases (compared to 1997-2006) of up to 11 % (total) and 13 % (summer) depending on catchment and scenario, whereas runoff volumes decrease by up to 39 % (total) and 47 % (summer) towards the end of the century (2071-2100), accompanied by a shift in peak flows from July towards June.

  5. Advanced energy projects FY 1994 research summaries

    International Nuclear Information System (INIS)

    1994-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are premature for consideration by applied research or technology development programs. The AEP also supports high-risk, exploratory concepts that do not readily fit into a program area but could have several applications that may span scientific disciplines or technical areas. Projects supported by the Division arise from unsolicited ideas and concepts submitted by researchers. The portfolio of projects is dynamic and reflects the broad role of the Department in supporting research and development for improving the Nation's energy outlook. FY 1994 projects include the following topical areas: novel materials for energy technology; renewable and biodegradable materials; exploring uses of new scientific discoveries; alternate pathways to energy efficiency; alternative energy sources; and innovative approaches to waste treatment and reduction. Summaries are given for 66 projects

  6. Investigacion Educativa: Areas - Politicas - Estrategias y Proyectos del ICOLPE, 2 (Educational Research: Topics, Policies, Strategies, and Projects of the Colombian Institute of Pedagogy, 2),

    Science.gov (United States)

    Ministerio de Educacion Nacional, Bogota (Colombia). Instituto Colombiano de Pedagogia.

    This booklet defines and establishes guidelines for educational research in Colombia. Sections describe basic philosophy and objectives, types of research, policies for educational investigation, governmental role, and principle areas for educational research. A listing of current and proposed research projects is provided. The final section…

  7. The GRASP project - a multidisciplinary study of hydrology and biogeochemistry in a periglacial catchment area

    Science.gov (United States)

    Johansson, Emma; Lindborg, Tobias

    2017-04-01

    The Arctic region is sensitive to global warming, and permafrost thaw and release of old carbon are examples of processes that may have a positive feedback effect to the global climate system. Quantification and assumptions on future change are often based on model predictions. Such models require cross-disciplinary data of high quality that often is lacking. Biogeochemical processes in the landscape are highly influenced by the hydrology, which in turn is intimately related to permafrost processes. Thus, a multidisciplinary approach is needed when collecting data and setting up field experiments aiming at increase the understanding of these processes. Here we summarize and present data collected in the GRASP, Greenland Analogue Surface Project. GRASP is a catchment-scale field study of the periglacial area in the Kangerlussuaq region, West Greenland, focusing on hydrological and biogeochemical processes in the landscape. The site investigations were initiated in 2010 and have since then resulted in three separate data sets published in ESSD (Earth system and Science Data) each one focusing on i) meteorological data and hydrology, ii) biogeochemistry and iii) geometries of sediments and the active layer. The three data-sets, which are freely available via the PANGAEA data base, enable conceptual and coupled numerical modeling of hydrological and biogeochemical processes. An important strength with the GRASP data is that all data is collected within the same, relatively small, catchment area. This implies that measurements are more easily linked to the right source area or process. Despite the small catchment area it includes the major units of the periglacial hydrological system; a lake, a talik, a supra- and subpermafrost aquifer and, consequently, biogeochemical processes in each of these units may be studied. The new data from GRASP is both used with the aim to increase the knowledge of present day periglacial hydrology and biogeochemistry but also in order to

  8. Policy and practice in Myanmar's protected area system.

    Science.gov (United States)

    Myint Aung, U

    2007-07-01

    Myanmar's protected area (PA) system began nearly 150 years ago under royal patronage. Park policies and practices, embodied in 19 pieces of legislation developed sporadically during and after the colonial period. As a result of the FAO-UNDP's Nature Conservation and National Parks Project (1981-1985) the government established the Nature & Wildlife Conservation Division and placed it within the Forest Department as the agency responsible for PA management. As a consequence the number of parks increased from 14 to 33. Myanmar's median park size is less than 50 km(2), but only five parks (15%) are larger than 1000 km(2). Most parks conserve terrestrial habitats; parks encompassing inland wetlands, mangrove, and marine habitats are limited in number and size. Existing PAs unequally represent Myanmar's ecosystems; the Malay Transition, Burmese coast, Burmese Transition and Cardamom Mountains bio-units are under-represented within the system. The effective total PA size (i.e., area of all parks less the area of 13 paper parks) is currently about 2.1%. Budgetary support for parks increased 11% since 1996, but is insufficient to address park needs, particularly in remote parks that are understaffed. Limited education and training of PA staff is a major factor limiting effective park management. Fifty-eight percent of park wardens are educated as foresters, and 42% have university degrees. The average posting in a park is 4 years, which is less than ideal for management continuity. Recommended actions to secure Myanmar's PAs include evaluation and reformulation of policies, increasing representation of Myanmar's habitats within the PA system, management planning, and standardizing protocols for anti-poaching patrols and other forms of law enforcement. Improved leadership training for wardens and range forest officers can also improve park management. Funding for community relations and more integrated management of parks and people can reduce conflicts, while

  9. Radiological Survey Results for Areas A1 North, A5A, A6, and B2 at the Molycorp Washington Remediation Project, Washington, Pennsylvania

    International Nuclear Information System (INIS)

    W.C. Adams

    2007-01-01

    Perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania. The U.S. Nuclear Regulatory Commission (NRC) requested the Oak Ridge Institute for Science and Education (ORISE) to provide limited training pertaining to ORISE radiological soil scanning and sampling procedures to the Pennsylvania Department of Environmental Protection (PADEP) personnel. In addition, the NRC also requested that ORISE perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania (Figure 1). ORISE has and will continue to interface with PADEP personnel in a joint effort to perform confirmatory radiological surveys, consisting of gamma scans and soil sampling, at the MWRP facility. PADEP personnel will continue to submit soil samples that they collect to ORISE for analyses. PADEP sample results, along with ORISE results, will be provided to the NRC and PADEP so that decisions regarding the radiological status of the surveyed areas can be determined. ORISE performed radiological surveys during the period of November 28 and 29, 2006. The survey unit (SU) available for ORISE radiological survey activities was Area A1 North. The MWRP final status survey (FSS) results for Area A1 North were reviewed prior to these survey activities. Prior to ORISE's survey activities, PADEP personnel had performed radiological surveys and collected soil samples from SU Areas A5A and A6. These samples were provided to ORISE for analyses while on site. After the ORISE radiological surveys, PADEP personnel collected soil samples from SU Areas A2 and B2 and these samples were shipped to ORISE for analyses in January 2007. Figure 2 depicts the MWRP Areas A through D; ORISE and PADEP personnel performed survey activities in portions of Areas A and B. For interlaboratory comparison analyses with MWRP's site contractor, Malcolm Pirnie (MP), ORISE requested soil samples from the Area A1 soil stockpiles

  10. Kintyre uranium project

    International Nuclear Information System (INIS)

    1988-04-01

    This project book is designed to outline the nature of the Kintyre uranium project for those associated with the project as employees, contractors and consultants and others. It explains why Canning Resources Pty Limited and CRA Exploration believe this resource and other resources in the Rundall region should be developed. It also outlines the environmental and social issues involved and the proposed means of addressing those issues. The Kintyre resource and associated areas of geological prospectivity are located in the Rundall region on the edge of the Great Sandy Desert, in the East Pilbara region of Western Australia. Canning Resources with CRA Exploration has spent over $20 million in the past two years in intensive drilling and exploration efforts in the Kintyre area and intends to spend a further $10 million in 1988. Investigations so far reveal that the resource has features which make it competitive with the best uranium mines in the world

  11. Simulated effects of projected ground-water withdrawals in the Floridan aquifer system, greater Orlando metropolitan area, east-central Florida

    Science.gov (United States)

    Murray, Louis C.; Halford, Keith J.

    1999-01-01

    Ground-water levels in the Floridan aquifer system within the greater Orlando metropolitan area are expected to decline because of a projected increase in the average pumpage rate from 410 million gallons per day in 1995 to 576 million gallons per day in 2020. The potential decline in ground-water levels and spring discharge within the area was investigated with a calibrated, steady-state, ground-water flow model. A wetter-than-average condition scenario and a drought-condition scenario were simulated to bracket the range of water-levels and springflow that may occur in 2020 under average rainfall conditions. Pumpage used to represent the drought-condition scenario totaled 865 million gallons per day, about 50 percent greater than the projected average pumpage rate in 2020. Relative to average 1995 steady-state conditions, drawdowns simulated in the Upper Floridan aquifer exceeded 10 and 25 feet for wet and dry conditions, respectively, in parts of central and southwest Orange County and in north Osceola County. In Seminole County, drawdowns of up to 20 feet were simulated for dry conditions, compared with 5 to 10 feet simulated for wet conditions. Computed springflow was reduced by 10 percent for wet conditions and by 38 percent for dry conditions, with the largest reductions (28 and 76 percent) occurring at the Sanlando Springs group. In the Lower Floridan aquifer, drawdowns simulated in southwest Orange County exceeded 20 and 40 feet for wet and dry conditions, respectively.

  12. Crystalline Repository Project: Review and comment of the Leech Lake Reservation Business Committee: Draft area recommendation report

    International Nuclear Information System (INIS)

    1986-09-01

    The Leech Lake Reservation Business Committee (LLRBC) has reviewed five documents related to the US Department of Energy's Crystalline Repository Project (CRP). They are the ''National Survey of Crystalline Rocks,'' ''General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories;' Final Siting Guidelines (10 CFR Part 960),'' ''Regional Characterization Reports for the North Central Region,'' the ''Region to Area Screening Methodology Document'' (SMD) and the ''Draft Area Recommendation Report'' (DARR). The comments and discussions of issues contained in this review will be considered in the preparation of the Final Area Recommendation Report, which will formally identify potentially acceptable sites for a second national repository for the permanent disposal of high level nuclear waste. Following a review of the above referenced documents, the LLRBC has concluded that the identification of potentially acceptable sites in the Draft Area Recommendation Report is based upon inferior and incomplete technical information being applied to a flawed screening process which, among other deficiencies, pays little attention to the importance of hydrological factors in the siting process. Although the DOE prefers that comments from states and tribes be directed at the Draft Area Recommendation Report alone, the Leech Lake Reservation Business Committee is extremely concerned about inadequacies in the ''National Survey of Crystalline Rocks'' (ORCD-1), which serves as the foundation for all siting work done to date. The national survey was conducted utilizing little of the time or staffing required for this important phase of the Crystalline Repository Program. As a result, the national survey is based upon out-of-date scientific literature, exaggerates certain screening variables that favor the selection of regions in the eastern US and arbitrarily eliminated the few western crystalline rock bodies that passed the questionable screening process utilized

  13. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  14. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  15. Project Soar.

    Science.gov (United States)

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  16. Oak woodland conservation as mitigation for roadway improvement

    Science.gov (United States)

    Park Steiner; Jackson Ford

    2015-01-01

    East Side Potter Valley (ESPV) Road is a heavily used rural collector road running north/south through the unincorporated area of Mendocino County known as Potter Valley. The roadway is significantly deteriorated and in need of repair and upgrade. The Mendocino County Department of Transportation (MCDOT) road project encompasses approximately 6.4 km of roadway that...

  17. Closure Report for Corrective Action Unit 110: Areas 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-08-01

    This Closure Report (CR) has been prepared for the Area 3 Radioactive Waste Management Site (RWMS) U-3ax/bl Disposal Unit Corrective Action Unit (CAU) 110 in accordance with the reissued (November 2000) Resource Conservation and Recovery Act (RCRA) Part B operational permit NEV HW009 (Nevada Division of Environmental Protection [NDEP], 2000) and the Federal Facility and Consent Order (FFACO) (NDEP et al., 1996). CAU 110 consists of one Corrective Action Site 03-23-04, described as the U-3ax/bl Subsidence Crater. Certifications of closure are located in Appendix A. The U-3ax/bl is a historic disposal unit within the Area 3 RWMS located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit was closed under the RCRA, as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10{sup 5} cubic meters (m{sup 3}) (8.12 x 10{sup 6} cubic feet [ft{sup 3}]) of waste. NTS atmospheric nuclear device testing generated approximately 95% of the total waste volume disposed of in U-3ax/bl; 80% of the total volume was generated from the Waste Consolidation Project. Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is normally in a state of moisture deficit.

  18. Rehabilitation and development of environmental pollution areas: pilot project in a former uranium mining area; Sanierung und Entwicklung umweltbelasteter Raeume: Modellvorhaben in einer ehemaligen Uranbergbauregion

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, B.; Rathmann, J.; Wirth, P.; Bovet, J.; Danielzyk, R.; Dienemann, H.; Dudel, G.; Freyer, W.; Hutter, G.

    2002-07-01

    Environmental hazards are obstacles to the development of communities and regions if they occur on broad areas with different sorts of damage at the same time, like ground damage caused by mining, ground contamination and damage to forests. In industrialized countries, people become increasingly aware of such grievances, mainly concentrating attention on certain types of areas like old industrial areas, mining and conversion areas. Often general problems of areas with weak structure (weak economical value creation, poor access possibilities) are added to the environmental hazards and this is the case in the former uranium mining area around Johanngeorgenstadt in the Saxonian Erzgebirge. The autonomous strengthening of negative processes causes the people to migrate and the settlement areas start to shrink. Facing such problems, approaches offering purely technical solutions for individual cases as practised in the past by the regional structural policies quickly reach their limits. Instead, more complex solutions are needed, connecting individual projects with the development of new perspectives for the communities involved. As a result of the positive experiences in uranium mining, the area of rehabilitation and development, the states with significant environmental hazards are given the recommendation to integrate areas needing rehabilitation and development into their plans for the state and regional development. This is based on the consideration that at first problematic areas must be determined in the development plans and then the actions plans containing the formulation and implementation of the goals of rehabilitation and development must be set up. [German] Umweltschaeden bilden fuer Gemeinden und Regionen ein Entwicklungshindernis, wenn sie grossflaechig auftreten und wenn sich unterschiedliche Schadensbilder, z.B. bergbaubedingte Tagesbrueche, Bodenkontaminationen und Waldschaeden ueberlagern. In den Industriestaaten werden Missstaende dieser Art

  19. Monitoring System for ALICE Surface Areas

    CERN Document Server

    Demirbasci, Oguz

    2016-01-01

    I have been at CERN for 12 weeks within the scope of Summer Student Programme working on a monitoring system project for surface areas of the ALICE experiment during this period of time. The development and implementation of a monitoring system for environmental parameters in the accessible areas where a cheap hardware setup can be deployed were aim of this project. This report explains how it was developed by using Arduino, Raspberry PI, WinCC OA and DIM protocol.

  20. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  1. Ghrelin and GHS-R1A signaling within the ventral and laterodorsal tegmental area regulate sexual behavior in sexually naïve male mice.

    Science.gov (United States)

    Prieto-Garcia, Luna; Egecioglu, Emil; Studer, Erik; Westberg, Lars; Jerlhag, Elisabet

    2015-12-01

    In addition to food intake and energy balance regulation, ghrelin mediate the rewarding and motivational properties of palatable food as well as addictive drugs. The ability of ghrelin to regulate reinforcement involves the cholinergic-dopaminergic reward link, which encompasses a cholinergic projection from the laterodorsal tegmental area (LDTg) to the ventral tegmental area (VTA) together with mesolimbic dopaminergic projections from the VTA to the nucleus accumbens (NAc). Recently, systemic ghrelin was shown to regulate sexual behavior and motivation in male mice via dopamine neurotransmission. The present study therefore elucidates the role of ghrelin and ghrelin receptor (GHS-R1A) antagonist treatment within NAc, VTA or LDTg for sexual behavior in sexually naïve male mice. Local administration of the GHSR-1A antagonist, JMV2959, into the VTA or LDTg was found to reduce the preference for female mice, the number of mounts and the duration of mounting as well as to prolong the latency to mount. This was further substantiated by the findings that ghrelin administration into the VTA or LDTg increased the number of mounts and the duration of mounting and decreased the latency to mount. Moreover, ghrelin administered into the LDTg increased the preference for female mice. Accumbal administration of ghrelin increased whereas GHS-R1A antagonist decreased the intake of palatable food, but did not alter sexual behavior. In males exposed to sexual interaction, systemic administration of ghrelin increases whereas JMV2959 decreases the turnover of dopamine in the VTA. These data suggest that ghrelin signaling within the tegmental areas is required for sexual behavior in sexually naïve male mice. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  2. The Greenland Analogue Project, Yearly Report 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-08-15

    To advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository, the Greenland Analogue Project (GAP), a four-year field and modelling study of the Greenland ice sheet and sub-surface conditions, has been initiated collaboratively by SKB, Posiva and NWMO. The study site encompasses a land terminus portion of the Greenland ice sheet east of Kangerlussuaq and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project is planned to run from 2009 until 2012. The GAP will conduct the first in situ investigations of some of the parameters and processes needed to achieve a realistic understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. The project includes three sub-projects (A-C) with specific individual objectives, which collectively aim at contributing knowledge and input to the overall project aim. Three field campaigns were carried out in SPA during 2009. These campaigns focused on: (1) deployment and maintenance of AWS and GPS stations and to test the deep-look radar equipment; (2) investigating the hydrological processes and feedbacks and testing of passive seismic equipment; (3) downloading of weather station data and GPS data and winterizing the equipment. An extensive archive of real-time satellite remote sensing datasets has been obtained to be able to better constraint the surface elevation and dynamics of basal hydrological mechanisms. From this archive it has been possible to obtain Russell Glacier Cachment (RGC)-wide constraints on annual, seasonal and specific temporal snapshots of surface speed, initial lake and moulin distribution, drainage and network connections along with the temporal

  3. The Greenland Analogue Project, Yearly Report 2009

    International Nuclear Information System (INIS)

    2011-08-01

    To advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository, the Greenland Analogue Project (GAP), a four-year field and modelling study of the Greenland ice sheet and sub-surface conditions, has been initiated collaboratively by SKB, Posiva and NWMO. The study site encompasses a land terminus portion of the Greenland ice sheet east of Kangerlussuaq and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project is planned to run from 2009 until 2012. The GAP will conduct the first in situ investigations of some of the parameters and processes needed to achieve a realistic understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. The project includes three sub-projects (A-C) with specific individual objectives, which collectively aim at contributing knowledge and input to the overall project aim. Three field campaigns were carried out in SPA during 2009. These campaigns focused on: (1) deployment and maintenance of AWS and GPS stations and to test the deep-look radar equipment; (2) investigating the hydrological processes and feedbacks and testing of passive seismic equipment; (3) downloading of weather station data and GPS data and winterizing the equipment. An extensive archive of real-time satellite remote sensing datasets has been obtained to be able to better constraint the surface elevation and dynamics of basal hydrological mechanisms. From this archive it has been possible to obtain Russell Glacier Cachment (RGC)-wide constraints on annual, seasonal and specific temporal snapshots of surface speed, initial lake and moulin distribution, drainage and network connections along with the temporal

  4. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  5. Indirect Field Measurement of Wine-Grape Vineyard Canopy Leaf Area Index

    Science.gov (United States)

    Johnson, Lee F.; Pierce, Lars L.; Skiles, J. W. (Technical Monitor)

    2002-01-01

    Leaf area index (LAI) indirect measurements were made at 12 study plots in California's Napa Valley commercial wine-grape vineyards with a LI-COR LI-2000 Plant Canopy Analyzer (PCA). The plots encompassed different trellis systems, biological varieties, and planting densities. LAI ranged from 0.5 - 2.25 sq m leaf area/ sq m ground area according to direct (defoliation) measurements. Indirect LAI reported by the PCA was significantly related to direct LAI (r(exp 2) = 0.78, p less than 001). However, the PCA tended to underestimate direct LAI by about a factor of two. Narrowing the instrument's conical field of view from 148 deg to 56 deg served to increase readings by approximately 30%. The PCA offers a convenient way to discern relative differences in vineyard canopy density. Calibration by direct measurement (defoliation) is recommended in cases where absolute LAI is desired. Calibration equations provided herein may be inverted to retrieve actual vineyard LAI from PCA readings.

  6. Variable exchange between a stream and an aquifer in the Rio Grande Project Area

    Science.gov (United States)

    Sheng, Z.; Abudu, S.; Michelsen, A.; King, P.

    2016-12-01

    Both surface water and groundwater in the Rio Grande Project area in southern New Mexico and Far West Texas have been stressed by natural conditions such as droughts and human activities, including urban development and agricultural irrigation. In some area pumping stress in the aquifer becomes so great that it depletes the river flow especially during the irrigation season, typically from March through October. Therefore understanding such relationship between surface water and groundwater becomes more important in regional water resources planning and management. In this area, stream flows are highly regulated by the upstream reservoirs during the irrigation season and greatly influenced by return flows during non-irrigation season. During a drought additional groundwater pumping to supplement surface water shortage further complicates the surface water and groundwater interaction. In this paper the authors will use observation data and results of numerical models (MODFLOW) to characterize and quantify hydrological exchange fluxes between groundwater in the aquifers and surface water as well as impacts of groundwater pumping. The interaction shows a very interesting seasonal variation (irrigation vs. non-irrigation) as well as impact of a drought. Groundwater has been pumped for both municipal supplies and agricultural irrigation, which has imposed stresses toward both stream flows and aquifer storage. The results clearly show that historic groundwater pumping has caused some reaches of the river change from gaining stream to losing stream. Beyond the exchange between surface water and groundwater in the shallow aquifer, groundwater pumping in a deep aquifer could also enhance the exchanges between different aquifers through leaky confining layers. In the earlier history of pumping, pumping from the shallow aquifer is compensated by simple depletion of surface water, while deep aquifer tends to use the aquifer storage. With continued pumping, the cumulative

  7. The SAVEMEDCOASTS Project

    Science.gov (United States)

    Anzidei, Marco; Patias, Petros; Forlenza, Giovanna; Trivigno, Maria Lucia; Michetti, Melania; Torresan, Silvia; Loizidou, Xenia; Petousis, Thanos; Doumaz, Fawzi; Lorito, Stefano; Brunori, Carlo Alberto; Pesci, Arianna; Carmisciano, Cosmo

    2017-04-01

    The SAVEMEDCOASTS Project (Sea Level Rise Scenarios along the Mediterranean Coasts), focuses on the Prevention Priority program of the European Commission ECHO A.5 "Civil protection policy, Prevention, Preparedness and Disaster Risk Reduction" and aims to respond to the need for people and assets prevention from natural disasters in Mediterranean coastal areas undergoing to increasing sea level rise and climate change impacts. The goals of the project are: i) to support civil protection at different levels and with different tools and methods to produce exhaustive risk assessments for different periods; ii) to improve governance and raise community awareness towards the impacts of sea level rise and related hazard; iii) to foster the cooperation amongst science, affected communities and civil protection organizations within and between targeted Mediterranean areas. Advanced methods are implied to develop multi-hazard assessments and existing databases for low-lying coastal areas already below or at less than 1 m above sea level, characterized by high economic and environmental value. The effects of sea level rise are assessed by mapping the multi-temporal scenarios of the inland extension of marine flooding and coastline position up to 2100, also temporarily increased during storms or tsunamis. They will result from i) the best available high resolution Digital Terrain Models (DTM); ii) known rates of land subsidence and iii) local sea level rise estimates. Finally, information is transferred to society, policy makers and stakeholders through an open web platform populated with collected information, videos and photo galleries, project results and guidelines. Here we show the strategy and goals of the SAVEMEDCOASTS Project.

  8. Pollution Prevention, Waste Minimization and Material Recycling Successes Realized during Savannah River Site's K Area Materials Storage (KAMS) Project, W226

    International Nuclear Information System (INIS)

    Ellis, M.S.

    2001-01-01

    As DOE continues to forge ahead and re-evaluate post cold war missions, facilities that were constructed and operated for DOE/DOD over the past 50+ years are coming to the end of their useful life span. These various facilities throughout the country had served a very useful purpose in our nations history; however, their time of Cold War materials production has come to an end. With this looming finalization comes a decision as to how to remedy their existence: D and R the facilities and return to ''Greenfield''; or, retrofit the existing facilities to accommodate the newer missions of the DOE Complex. The 105-K Reactor Building located at the Savannah River Site in Aiken, South Carolina was retrofit on an accelerated project schedule for a new mission called K-Area Materials Storage (KAMS). Modifications to the former defense reactor's building and equipment will allow storage of Plutonium from the Rocky Flats Site in Colorado and other materials deemed necessary by the Department of Energy. Proper project planning and activity sequencing allowed the DOE and the Westinghouse Savannah River Company to realize savings from: the recycling and/or reuse of modified facility components; reduction and reclassification of waste; reduction in radiological area footprint (rollbacks)

  9. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  10. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  11. Involvement of Amylin and Leptin in the Development of Projections from the Area Postrema to the Nucleus of the Solitary Tract

    Directory of Open Access Journals (Sweden)

    Kathrin Abegg

    2017-11-01

    Full Text Available The area postrema (AP and the nucleus of the solitary tract (NTS are important hindbrain centers involved in the control of energy homeostasis. The AP mediates the anorectic action and the inhibitory effect on gastric emptying induced by the pancreatic hormone amylin. Amylin’s target cells in the AP project to the NTS, an integrative relay center for enteroceptive signals. Perinatal hormonal and metabolic factors influence brain development. A postnatal surge of the adipocyte-derived hormone leptin represents a developmental signal for the maturation of projections between hypothalamic nuclei controlling energy balance. Amylin appears to promote neurogenesis in the AP in adult rats. Here, we examined whether amylin and leptin are required for the development of projections from the AP to the NTS in postnatal and adult mice by conducting neuronal tracing studies with DiI in amylin- (IAPP−/− and leptin-deficient (ob/ob mice. Compared to wild-type littermates, postnatal (P10 and adult (P60 IAPP−/− mice showed a significantly reduced density of AP-NTS projections. While AP projections were also reduced in postnatal (P14 ob/ob mice, AP-NTS fiber density did not differ between adult ob/ob and wild-type animals. Our findings suggest a crucial function of amylin for the maturation of neuronal brainstem pathways controlling energy balance and gastrointestinal function. The impaired postnatal development of neuronal AP-NTS projections in ob/ob mice appears to be compensated in this experimental model during later brain maturation. It remains to be elucidated whether an amylin- and leptin-dependent modulation in neuronal development translates into altered AP/NTS-mediated functions.

  12. Efferent projections of the septum in the Tegu lizard, Tupinambis nigropunctatus.

    Science.gov (United States)

    Sligar, C M; Voneida, T J

    1981-09-01

    A H3 proline or H3 leucine mixture was injected into the septal region of the Tegu lizard in order to determine its efferent projections. The brains were processed according to standard autoradiographic technique and counterstained with cresyl violet. Septal projections were limited to either telencephalic or diencephalic areas. Intratelencephalic projections consisted of efferents to medial pallium, nucleus accumbens, bed nucleus of the anterior commissure, preoptic area and septum itself. Fibers entering the diencephalon projected to medial habenular nucleus, dorsomedial thalamic nucleus, dorsolateral thalamic area, periventricular nucleus of the hypothalamus, lateral hypothalamic area and mammillary nucleus. The results are discussed in relation to the efferent projections of the septum in other vertebrates.

  13. Project management – the way to performance among corporations

    Directory of Open Access Journals (Sweden)

    Luminiţa PISTOL

    2012-06-01

    Full Text Available Project management has developed from a simple management philosophy restricted to a few functional areas into a business process that include various areas from global market. Nowadays, most of the corporations are using project management systems to achieve performance on the global market, and they realize that project management and productivity are related.

  14. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  15. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  16. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    Energy Technology Data Exchange (ETDEWEB)

    Erkelens, Conrad

    1994-03-01

    This report details the archaeological investigation of a 200 foot wide sample corridor extending approximately 9 miles along the southern portion of Maui within the present districts of Hana and Makawao. A total of 51 archaeological sites encompassing 233 surface features were documented. A GPS receiver was used to accurately and precisely plot locations for each of the documented sites. Analysis of the locational information suggests that archaeological sites are abundant throughout the region and only become scarce where vegetation has been bulldozed for ranching activities. At the sea-land transition points for the underwater transmission cable, both Ahihi Bay and Huakini Bay are subjected to seasonal erosion and redeposition of their boulder shorelines. The corridor at the Ahihi Bay transition point runs through the Moanakala Village Complex which is an archaeological site on the State Register of Historic Places within a State Natural Area Reserve. Numerous other potentially significant archaeological sites lie within the project corridor. It is likely that rerouting of the corridor in an attempt to avoid known sites would result in other undocumented sites located outside the sample corridor being impacted. Given the distribution of archaeological sites, there is no alternative route that can be suggested that is likely to avoid encountering sites. A total of twelve charcoal samples were obtained for potential taxon identification and radiocarbon analysis. Four of these samples were subsequently submitted for dating and species identification. Bird bone from various locations within a lava tube were collected for identification. Sediment samples for subsequent pollen analysis were obtained from within two lava tubes. With these three sources of information it is hoped that paleoenvironmental data can be recovered that will enable a better understanding of the setting for Hawaiian habitation of the area. A small test unit was excavated at one habitation site

  17. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  18. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  19. 7 CFR 1739.11 - Eligible project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Eligible project. 1739.11 Section 1739.11 Agriculture... BROADBAND GRANT PROGRAM Community Connect Grant Program § 1739.11 Eligible project. To be eligible for a grant, the Project must: (a) Serve a Rural Area where Broadband Transmission Service does not currently...

  20. The Difficulty in Following Project Schedule as a Key Project Management Challenge: Family Firm Perspective

    Directory of Open Access Journals (Sweden)

    Joanna SADKOWSKA

    2016-12-01

    Full Text Available The problem of how to manage projects successfully has been gaining growing interest for the last decades. The aforementioned is mainly caused by the fact that project management offers a wide range of methods and tools which, when properly used, can stimulate long-term growth of businesses. As a consequence it offers a particular development opportunity for family enterprises which, due to their specificity, have to overcome many difficulties. The primary objective of this paper is to examine whether family enterprises perceive, and to what extent, the factor of following project schedule as a difficulty in the area of project management. 154 Polish family firms representing different sectors were surveyed. The results of regression analysis show that family firms with global range of business activities, on the contrary to those with local or regional ones, do not find the factor of following project schedule as a difficulty. This results manly from the tools employed and the maturity level they have reached in project management. The findings support the current discussion on the specificity and uniqueness of family businesses in relationship to the knowledge area of project management. It also contributes to filling the gap on understanding the functioning of family firms in the emerging economies of Eastern Europe.

  1. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  2. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  3. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  4. Farmers' Willingness to Participate in the Next-Stage Grain-for-Green Project in the Three Gorges Reservoir Area, China.

    Science.gov (United States)

    Feng, Lin; Xu, Jianying

    2015-08-01

    The policy implications for success in the next-stage Grain-for-Green Project (GFGP) in China are analyzed from the perspectives of farmers' willingness. The ecological protection belt of the Three Gorges Reservoir Area was chosen as the case study area, where 1207 valid questionnaire surveys based on participatory rural appraisal were collected in 2012. Our study found that farmers with lower levels of education, older age, and higher livelihood dependency on farmland were more prone to reclamation if the compensation ended. Females and non-migrants were more reluctant to participate in the next GFGP than others. Nevertheless, traditional farming was no longer a preferred livelihood by all respondents. The majority of respondents (74.4%) wished to be liberated from the low-income farmland work through the next GFGP, and half of them (50.6%) hoped to get non-cash compensation. The Willingness to Accept (WTA) values of the next GFGP showed significant social heterogeneity and regional difference, with an average of annual RMB¥16,665 ha(-1), about 4.5 times the local compensation standard in 2000. By revealing some limitations of the uniform nationwide compensation standard system and the single payment form in adapting to evolving socioeconomic conditions, our study highlighted the importance of developing a region-based compensation standard system, integrating the next GFGP into regional sustainable development organically by more comprehensive alternative policy, and bonding a vertical partnership between the local community and the nation. Our study revealed some key elements for success in the future design of restoration projects in China.

  5. 4-H Textile Science Beginner Projects.

    Science.gov (United States)

    Scholl, Jan

    This packet contains three 4-H projects for students beginning the sewing sequence of the textile sciences area. The projects cover basics of sewing using sewing machines, more difficult sewing machine techniques, and hand sewing. Each project provides an overview of what the student will learn, what materials are needed, and suggested projects…

  6. Organization of visual cortical projections to the claustrum in the cat

    International Nuclear Information System (INIS)

    Jayaraman, A.; Updyke, B.V.

    1979-01-01

    The projection patterns from different visual areas of the parieto-occipital cortex to the claustrum were studied autoradiographically in cats. When [ 3 H] was injected into 17, 18, 19 or Clare-Bishop areas, the label was transported to an area restricted to the dorsal and caudal parts of the claustrum without any suggestion of retinotopic organization. Injection in each of these visual areas resulted in individual patterns of projection but with overlapping fields of termination, a pattern similar to corticocaudate projection. When injected into area 7, a region shown to have neurons involved in visuomotor mechanisms, the label was transported to the same area as that of the visual projection. These and other findings suggest that claustrum may be reciprocally and topographically connected with the cerebral cortex. (Auth.)

  7. Evaluation of Bernese periacetabular osteotomy: prospective studies examining projected load-bearing area, bone density, cartilage thickness and migration.

    Science.gov (United States)

    Mechlenburg, Inger

    2008-06-01

    The typical dysplastic hip joint is characterised by maldirection of the acetabulum and femoral neck, insufficient coverage of the femoral head focally and globally and erosions of the limbus acetabuli (1). An unknown number of persons with hip dysplasia will suffer from pain in hip or groin, decreased hip function and development of osteoarthritis at a young age. The Bernese periacetabular osteotomy is performed to prevent osteoarthritis in patients with hip dysplasia and has been carried out at Aarhus University Hospital, Denmark since 1996 with more than 500 osteotomies performed. Throughout the years, research and quality improvement of the treatment has taken place and this PhD thesis is part of that process. The aims of this PhD thesis were to evaluate outcome aspects after periacetabular osteotomy in terms of I) estimating the projected loadbearing surface before and after periacetabular osteotomy, II) estimating bone density changes in the acetabulum after periacetabular osteotomy, III) developing a technique to precisely and efficiently estimate the thickness of the articular cartilage in the hip joint and IV) examining the stability of the re-orientated acetabulum after periacetabular osteotomy. In study I, we applied a stereologic method based on 3D computed tomography (CT) to estimate the projected loadbearing surface in six normal hip joints and in six dysplastic hips. The dysplastic hips were CT scanned before and after periacetabular osteotomy. We found that the average area of the projected loadbearing surface of the femoral head preoperatively was 7.4 (range 6.5-8.4) cm2 and postoperatively 11 (9.8-14.3) cm2. The area of the projected loadbearing surface was increased significantly with a mean of 49% (34-70%) postoperatively and thus comparable with the load-bearing surface in the normal control group. Double measurements were performed and the error variance of the mean was estimated to be 1.6%. The effect of overprojection, on the projected

  8. Literature and data review for the surface-water pathway: Columbia River and adjacent coastal areas. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Walters, W.H.; Dirkes, R.L.; Napier, B.A.

    1992-11-01

    As part of the Hanford Environmental Dose Reconstruction (HEDR) Project, Battelle, Pacific Northwest Laboratories reviewed literature and data on radionuclide concentrations and distribution in the water, sediment, and biota of the Columbia River and adjacent coastal areas. Over 600 documents were reviewed including Hanford reports, reports by offsite agencies, journal articles, and graduate theses. Radionuclide concentration data were used in preliminary estimates of individual dose for the period 1964 through 1966. This report summarizes the literature and database reviews and the results of the preliminary dose estimates.

  9. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  10. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  11. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  12. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  13. Summer transport patterns affecting the Mohave Power Project emission

    Energy Technology Data Exchange (ETDEWEB)

    Farber, R.J.; Hoffer, T.E.; Green, M.C.; Walsh, P.A. [Southern California Edison, Rosemead, CA (United States)

    1997-03-01

    The Mohave Power Project (MPP) is an isolated 1580-MW coal-fired electric generating plant located in Laughlin, NV. Laughlin is a small desert gambling town situated in the lower Colorado River Valley near the junction of three states: Nevada, California, and Arizona. The location of the MPP is approximately 155 km southwest of the western end of the Grand Canyon National Park and about 240 km southwest from the Grand Canyon Village. This paper describes the summer transport patterns of the MPP emittants using illustrated examples from the Project MOHAVE (measurements of Haze and Visual Effects) 1992 summer intensive study. The intensive study lasted 50 days from mid-July through August and encompassed the major meteorological patterns associated with southwestern US summer meteorology. The MPP emittants were transported towards the Grand Canyon (north to the northeast) during more than 80% of the total hours. Airflow as from the south most of the time due to a combination of the semi-permanent thermal low, differential heating between the Gulf of California and lower Colorado River Valley, and upslope heating of the southern and western slopes of the nearby Colorado Plateau. 14 refs., 12 figs., 2 tabs.

  14. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  15. Telemedicine and primary health: The virtual doctor project Zambia

    OpenAIRE

    Mupela, Evans; Mustarde, Paul; Jones, Huw

    2011-01-01

    This paper is a commentary on a project application of telemedicine to alleviate primary health care problems in Lundazi district in the Eastern province of Zambia. The project dubbed 'The Virtual Doctor Project' will use hard body vehicles fitted with satellite communication devices and modern medical equipment to deliver primary health care services to some of the neediest areas of the country. The relevance and importance of the project lies in the fact that these areas are hard-to-reach d...

  16. Developing A/E capabilities; areas of special interest

    International Nuclear Information System (INIS)

    Gonzalez, A.; Gurbindo, J.

    1988-01-01

    During the last few years, the methods used by Empresarios Agrupados and INITEC to perform Architect-Engineering work in Spain for nuclear projects has undergone a process of significant change in project management and engineering approaches. Specific practical examples of management techniques and design practices which represent a good record of results will be discussed. They are identified as areas of special interest in developing A/E capabilities for nuclear projects. Command of these areas should produce major payoffs in local participation and contribute to achieving real nuclear engineering capabilities in the country

  17. [Potential of cooperative learning in project development : Relevance of cooperative participation procedure for the further development of generation-appropriate accomodation in structurally weak rural areas].

    Science.gov (United States)

    Kaufmann, Gerd; Frankenberg, Olga; Sommer, Ralf-Rüdiger; Jost, Annemarie

    2017-04-01

    A joint initiative of existing senior care organizations, the municipality of Meyenburg and the state of Brandenburg was further developed by affiliation of an institute of the Brandenburg University of Technology Cottbus-Senftenberg (ABV) in cooperation with members of the architecture and social work departments in 2014. A cooperative process between different players was central to create an appropriate structure of services for this region. Cooperative projects are necessary to establish new forms of generation-appropriate living and care concepts in rural areas. Cooperative learning methods are needed to develop new forms of generation-appropriate living and care concepts in rural areas, which take the diversity of elderly people, the rural context, intergenerational residential arrangements and affordable accommodation that meets the requirements of the social security system into account. Furthermore, the project had to reflect the recent developments of the German care insurance. The article describes the participatory methods, the coordination process and the resulting concept.

  18. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  19. Projections of change in key ecosystem indicators for planning and management of marine protected areas: An example study for European seas

    Science.gov (United States)

    Kay, Susan; Butenschön, Momme

    2018-02-01

    Marine Protected Areas (MPAs) are widely used as tools to maintain biodiversity, protect habitats and ensure that development is sustainable. If MPAs are to maintain their role into the future it is important for managers to understand how conditions at these sites may change as a result of climate change and other drivers, and this understanding needs to extend beyond temperature to a range of key ecosystem indicators. This case study demonstrates how spatially-aggregated model results for multiple variables can provide useful projections for MPA planners and managers. Conditions in European MPAs have been projected for the 2040s using unmitigated and globally managed scenarios of climate change and river management, and hence high and low emissions of greenhouse gases and riverborne nutrients. The results highlight the vulnerability of potential refuge sites in the north-west Mediterranean and the need for careful monitoring at MPAs to the north and west of the British Isles, which may be affected by changes in Atlantic circulation patterns. The projections also support the need for more MPAs in the eastern Mediterranean and Adriatic Sea, and can inform the selection of sites.

  20. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  1. Ethiopia Pastoralist Areas Resilience Improvement and Market Expansion (PRIME) Project IE

    Data.gov (United States)

    US Agency for International Development — This baseline survey serves as the first stage of an impact evaluation designed to determine the impact of the project's interventions on households? resilience to...

  2. R and D areas for next generation desalination and water purification technologies

    International Nuclear Information System (INIS)

    Raha, A.; Rao, I.S.; Srivastava, V.K.; Tewari, P.K.

    2007-01-01

    By 2020, desalination and water purification technologies are expected to contribute significantly to ensure a safe, sustainable, affordable and adequate water supply. The cost of producing water from the current generation desalination technologies has declined over time at a rate of only approximately 4% per year. So we need to accelerate our research and development (R and D) activities with a near and long term objective for evolution of current generation desalination technology and to create revolutionary next generation advanced desalination and water purification technologies which will offer a promise of step reduction in cost of producing water. There are five broad technological areas-thermal technologies, membrane technologies, alternate technologies, concentrate management technologies, reuse and recycle technologies that encompass the spectrum of desalination technology. In this paper high priority research areas in all the above technologies areas are discussed to make decision about research direction that will help to mitigate our nation's future water supply challenges. (author)

  3. The SKI-project External events - Phase 2. Estimation of fire frequencies per plant and per building

    International Nuclear Information System (INIS)

    Poern, K.

    1996-08-01

    The Swedish-Finnish handbook for initiating event frequencies, I-Book, does not contain any fire frequencies. This matter of fact is not defensible considering the substantial risk contribution caused by fires. In the PSAs performed hitherto the initiating fire frequencies have been determined from case to case. Because data are usually very scarce in these areas it is very important to develop unique definitions, to systematically utilize both international and national experiences and to establish an appropriate statistical estimation method. It is also important to present the accumulated experience such that it can be used for different purposes, not only within PSA but also in the concrete fire preventive work. During phase 1 of the project External Events an inventory was made of existing methods for probabilistic fire analysis in general. During phase 2 of the project it was decided to initialize the work on a complementary handbook, called X-Book, in order to encompass the frequencies of system external events, i.e. initiating events that are caused by events occurring outside the system boundaries. In Version 1 of the X-Book the attention is mainly focussed on the estimation of initiating fire frequencies, per plant and per building. This estimation is basically founded on reports that the power companies have collected for this specific purpose. This report describes the statistical model and method that have been used in the estimation process. The methodological results achieved may, possibly after some modification, be applicable also to other types of system external events

  4. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  5. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  6. Biomass burning studies and the International Global Atmospheric Chemistry (IGAC) project

    Science.gov (United States)

    Prinn, Ronald G.

    1991-01-01

    IGAC is an ambitious, decade-long and global research initiative concerned with major research challenges in the field of atmospheric chemistry; its chemists and ecosystem biologists are addressing the problems associated with global biomass burning (BMB). Among IGAC's goals is the achievement of a fundamental understanding of the natural and anthropogenic processes determining changes in atmospheric composition and chemistry, in order to allow century-long predictions. IGAC's studies have been organized into 'foci', encompassing the marine, tropical, polar, boreal, and midlatitude areas, as well as their global composite interactions. Attention is to be given to the effects of BMB on biogeochemical cycles.

  7. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  8. Action Memorandum for Decommissioning the Engineering Test Reactor Complex under the Idaho Cleanup Project

    International Nuclear Information System (INIS)

    A. B. Culp

    2007-01-01

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared and released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessel. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface

  9. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    Science.gov (United States)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  10. The Geysers-Clear Lake geothermal area, California - an updated geophysical perspective of heat sources

    Science.gov (United States)

    Stanley, W.D.; Blakely, R.J.

    1995-01-01

    The Geysers-Clear Lake geothermal area encompasses a large dry-steam production area in The Geysers field and a documented high-temperature, high-pressure, water-dominated system in the area largely south of Clear Lake, which has not been developed. An updated view is presented of the geological/geophysical complexities of the crust in this region in order to address key unanswered questions about the heat source and tectonics. Forward modeling, multidimensional inversions, and ideal body analysis of the gravity data, new electromagnetic sounding models, and arguments made from other geophysical data sets suggest that many of the geophysical anomalies have significant contributions from rock property and physical state variations in the upper 7 km and not from "magma' at greater depths. Regional tectonic and magmatic processes are analyzed to develop an updated scenario for pluton emplacement that differs substantially from earlier interpretations. In addition, a rationale is outlined for future exploration for geothermal resources in The Geysers-Clear Lake area. -from Authors

  11. City of Huntsville Public Housing Areas STEM Initiative Project

    Science.gov (United States)

    Colon, Tomeka; Smith, Cydale; Pugh, Marcus; Budak, Satilmis; Muntele, Claudiu

    2012-02-01

    Students in high-poverty and high-minority schools are entering the classroom without the knowledge and skills they need to succeed. In order to bridge the gaps in opportunity and achievement that separate low-income students and students of color from other young Americans, we have introduced elementary and middle school students to the basic concepts of biology, chemistry, physics, and engineering. Within the project, we have provided students with excellent learning opportunities, engaging hands-on experiences, and outstanding advising and mentoring. We have assessed student development and impact before, during, and after the program.

  12. Corrective action plan for corrective action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Nacht, S.

    1999-01-01

    The Mercury Fire Training Pit is a former fire training area located in Area 23 of the Nevada Test Site (NTS). The Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting personnel at the NTS, and encompasses an area approximately 107 meters (m) (350 feet [ft]) by 137 m (450 ft). The Mercury Fire Training Pit formerly included a bermed burn pit with four small burn tanks, four large above ground storage tanks an overturned bus, a telephone pole storage area, and areas for burning sheds, pallets, and cables. Closure activities will include excavation of the impacted soil in the aboveground storage tank and burn pit areas to a depth of 1.5 m (5 ft), and excavation of the impacted surface soil downgradient of the former ASTs and burnpit areas to a depth of 0.3 m (1 ft). Excavated soil will be disposed in the Area 6 Hydrocarbon Landfill at the NTS

  13. An Essay on Project Management in Organisational Change

    DEFF Research Database (Denmark)

    Ry Nielsen, Jens Carl; Ry, Morten

    2003-01-01

    ,indicating what we are not dealing with. We prefer to make a positive delineation, emphasisingwhat we are going to take up in our essay.Positively phrased we are inspired by 3 sources that will make the foundation for our differentangles:1. Decision making theory (Enderud,1976)4. One of the authors has previously...... with successapplied decision-making theory as an approach for analysing organisation change processes5. Both authors have followed the same line in analysing organisational changes inthe Danish public sector6. That success has inspired us to re-use the distinction betweenrational, political and anarchic processes...... differentangles, although not forgetting the sources you used. The implication of this is that we are not ableor willing to make an encompassing study of the literature on project management3. We thus knowthat many angles will not be covered. Furthermore we do not intend a make a negative delineation...

  14. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  15. Guifi.net: Security analysis of a heterogeneous community network

    OpenAIRE

    Ramos García, Patricia

    2018-01-01

    Guifi.net is a heterogeneous community network that brings Internet to rural areas or vulnerable groups. This opens the door to many advances, but encompasses some risks as well. The aim of this project is to assess the general security of Guifi.net from tests performed on a key network element: the router. In particular, MikroTik and Ubiquiti are the most used makes in Guifi.net and hence, the target of this project. Basic, yet important, security settings are tested. On the plus side, the ...

  16. Climate Ready Estuaries Partner Projects Map

    Science.gov (United States)

    CRE partners with the National Estuary Program to develop climate change projects in coastal U.S. areas, such as bays and harbors; to develop adaptation action plans, identify climate impacts and indicators, and more. This map shows project locations.

  17. The Swedish satellite project Viking

    International Nuclear Information System (INIS)

    Hultqvist, B.

    1990-01-01

    The Swedish satellite project Viking is described and related to earlier missions. Some new operational characteristics are discussed, including the real-time data analysis campaigns that were an important part of the project. Some areas of important scientific impact of the project are also described. Viking was specially designed and equipped for investigation of plasma physical acceleration and other processes in the transition region between hot and cold plasma on auroral latitude magnetic field lines

  18. Council of Europe Black Sea Area Project: International Cooperation for the Development of Activities Related to Donation and Transplantation of Organs in the Region.

    Science.gov (United States)

    Arredondo, E; López-Fraga, M; Chatzixiros, E; Senemaud, B; Brezovsky, P; Carella, C; Ballesté, C; Aydin Mehmet, A; Tomadze, G; Codreanu, I; Sarkissian, A A; Simeonova, M; Nikonenko, A; Zota, V; Gómez, M P; Manyalich, M; Bolotinha, C; Franca, A; Costa, A N; Ott, M-O; Buchheit, K-H

    2018-03-01

    In 2011, the European Directorate for the Quality of Medicines & Healthcare of the Council of Europe launched a 3-year collaborative project to address the organ shortage and improve access to transplant health services in Council of Europe member states in the Black Sea area (Armenia, Azerbaijan, Bulgaria, Georgia, Moldova, Romania, Turkey, Ukraine, and the Russian Federation) through the development of safe and ethical donation and transplantation programs. Support the development of donation and transplantation programs through close interstate cooperation between national health organizations and relevant stakeholders. Several work packages (WP) were established: WP1, project coordination (European Directorate for the Quality of Medicines & Healthcare); WP2, development and implementation of an effective legislative and financial framework (Czech Republic and France); WP3, establishment of National Transplant Authorities (Italy and Portugal); and WP4, clinical practices (DTI Foundation). Data collection, surveys, and expert visits allowed for the collection of first-hand information from each participant country at national, regional, and hospital levels. Data analysis showed the positive impact of the project represented by a tendency to increase the total donation rates (per million people) in the participant countries (2011 vs 2013): Azerbaijan, +7.3; Armenia, -0.7; Georgia, +3.3; Bulgaria, +0.9; Moldova, +2.5; Ukraine:, +0.8; Romania, +2.3; and Turkey, +2.7. Increases in total donation rates are the result of a number of initiatives in the Black Sea area, including the stepwise implementation of legislative, organizational and institutional country-specific recommendations tailored by the CoE, efforts of the respective Ministries of Health in each country and synergism with other European projects in the region. These countries should invest further in implementing the recommendations that emerged from this project to improve their organ donation

  19. Mixed and Low-Level Waste Treatment Facility project

    International Nuclear Information System (INIS)

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. The engineering studies, initiated in July 1991, identified 37 mixed waste streams, and 55 low-level waste streams. This report documents the waste stream information and potential treatment strategies, as well as the regulatory requirements for the Department of Energy-owned treatment facility option. The total report comprises three volumes and two appendices. This report consists of Volume 1, which explains the overall program mission, the guiding assumptions for the engineering studies, and summarizes the waste stream and regulatory information, and Volume 2, the Waste Stream Technical Summary which, encompasses the studies conducted to identify the INEL's waste streams and their potential treatment strategies

  20. Brainstem projections of neurons located in various subdivisions of the dorsolateral hypothalamic area – an anterograde tract-tracing study

    Directory of Open Access Journals (Sweden)

    Rege Sugárka Papp

    2014-05-01

    Full Text Available The projections from the dorsolateral hypothalamic area (DLH to the lower brainstem have been investigated by using biotinylated dextran amine (BDA, an anterograde tracer in rats. The DLH can be divided into 3 areas (dorsomedial hypothalamus, perifornical area, lateral hypothalamic area, and further subdivided into 8 subdivisions. After unilateral stereotaxic injections of BDA into individual DLH subdivisions, the correct sites of injections were controlled histologically, and the distribution patterns of BDA-positive fibers were mapped on serial sections between the hypothalamus and spinal cord in 22 rats. BDA-labeled fibers were observable over 100 different brainstem areas, nuclei or subdivisions. Injections into the 8 DLH subdivisions established distinct topographical patterns. In general, the density of labeled fibers was low in the lower brainstem. High density of fibers was seen only 4 of the 116 areas: in the lateral and ventrolateral parts of the periaqueductal gray, the Barrington’s and the pedunculopontine tegmental nuclei. All of the biogenic amine cell groups in the lower brainstem (9 noradrenaline, 3 adrenaline and 9 serotonin cell groups received labeled fibers, some of them from all, or at least 7 DLH subdivisions, mainly from perifornical and ventral lateral hypothalamic neurons. Some of the tegmental nuclei and nuclei of the reticular formation were widely innervated, although the density of the BDA-labeled fibers was generally low. No definitive descending BDA-positive pathway, but long-run solitaire BDA-labeled fibers were seen in the lower brainstem. These descending fibers joined some of the large tracts or fasciculi in the brainstem. The distribution pattern of BDA-positive fibers of DLH origin throughout the lower brainstem was comparable to patterns of previously published orexin- or melanin-concentrating hormone-immunoreactive fibers with somewhat differences.

  1. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  2. Experiences of the BIOMAS-CUBA Project. Energy alternatives from biomass in Cuban rural areas

    International Nuclear Information System (INIS)

    Suárez, J.; Martín, G. J.; Cepero, L.; Funes-Monzote, F.; Blanco, D.; Machado, R.; Sotolongo, J. A.; Rodríguez, E.; Savran, Valentina; Rivero, J. L.; Martín, C.; García, A.

    2011-01-01

    This paper provides experiences of the international project BIOMAS-CUBA in the implementation of energy supply alternatives from biomass in rural areas, which are compatible to food security and environmental sustainability. These experiences are comprised between 2009 and 2011, within the agroenergetic farm concept, and are related to research and technological innovation processes associated to: the morphological, productive and chemical evaluation of germplasm of non-edible oil plants with potential to produce biodiesel, ethanol and other products; the planting and agricultural management of associations of Jatropha curcas and 21 food crops; the cleaning and oil extraction of Jatropha seeds; the physical-chemical characterization of such oil; the production of biodiesel and its co-products; the biogas production from excreta and bioproducts and biofertilizers, with the effluents of biodigesters; the gasification of ligneous biomass to generate electricity; the characterization and classification of integrated food and energy production systems. Likewise, the socioeconomic and environmental studies allowed appreciating adequate economic-financial feasibility, remarkable increases in food production, the formation of human capital and the improvement of the people's quality of life, a positive environmental impact and a substitution of energy porters and conventional fertilizers. (author)

  3. Ecological Footprint of Biological Resource Consumption in a Typical Area of the Green for Grain Project in Northwestern China

    Directory of Open Access Journals (Sweden)

    Jie Hu

    2015-01-01

    Full Text Available Following the implementation of the Green for Grain Project in 2000 in Guyuan, China, the decrease in cultivated land and subsequent increase in forest and grassland pose substantial challenges for the supply of biological products. Whether the current biologically productive land-use patterns in Guyuan satisfy the biological product requirements for local people is an urgent problem. In this study, the ecological footprints of biological resource consumption in Guyuan were calculated and analyzed based on the ‘City Hectare’ Ecological Footprint (EF Method. The EFs of different types of biological resource products consumed from different types of biologically productive land were then analyzed. In addition, the EFs of various biological resource products before and after the implementation of the Green for Grain Project (1998 and 2012 were assessed. The actual EF and bio-capacity (BC were compared, and differences in the EF and BC for different types of biologically productive lands before and after the project were analyzed. The results showed that the EF of Guyuan’s biological resource products was 0.65866 ha/cap, with an EF outflow and EF inflow of 0.2280 ha/cap and 0.0951 ha/cap, respectively. The per capita EF of Guyuan significantly decreased after the project, as did the ecological deficit. Whereas the cultivated land showed a deficit, grasslands were characterized by ecological surplus. The total EF of living resource consumption in Guyuan was 810,941 ha, and the total BC was 768,065 ha. In additional to current biological production areas, approximately 42,876 ha will be needed to satisfy the demands of Guyuan’s people. Cultivated land is the main type of biologically productive land that is needed.

  4. CARMA Large Area Star Formation Survey: Project Overview with Analysis of Dense Gas Structure and Kinematics in Barnard 1

    Science.gov (United States)

    Storm, Shaye; Mundy, Lee G.; Fernández-López, Manuel; Lee, Katherine I.; Looney, Leslie W.; Teuben, Peter; Rosolowsky, Erik; Arce, Héctor G.; Ostriker, Eve C.; Segura-Cox, Dominique M.; Pound, Marc W.; Salter, Demerese M.; Volgenau, Nikolaus H.; Shirley, Yancy L.; Chen, Che-Yu; Gong, Hao; Plunkett, Adele L.; Tobin, John J.; Kwon, Woojin; Isella, Andrea; Kauffmann, Jens; Tassis, Konstantinos; Crutcher, Richard M.; Gammie, Charles F.; Testi, Leonardo

    2014-10-01

    We present details of the CARMA Large Area Star Formation Survey (CLASSy), while focusing on observations of Barnard 1. CLASSy is a CARMA Key Project that spectrally imaged N2H+, HCO+, and HCN (J = 1 → 0 transitions) across over 800 square arcminutes of the Perseus and Serpens Molecular Clouds. The observations have angular resolution near 7'' and spectral resolution near 0.16 km s-1. We imaged ~150 square arcminutes of Barnard 1, focusing on the main core, and the B1 Ridge and clumps to its southwest. N2H+ shows the strongest emission, with morphology similar to cool dust in the region, while HCO+ and HCN trace several molecular outflows from a collection of protostars in the main core. We identify a range of kinematic complexity, with N2H+ velocity dispersions ranging from ~0.05 to 0.50 km s-1 across the field. Simultaneous continuum mapping at 3 mm reveals six compact object detections, three of which are new detections. A new, non-binary dendrogram algorithm is used to analyze dense gas structures in the N2H+ position-position-velocity (PPV) cube. The projected sizes of dendrogram-identified structures range from about 0.01 to 0.34 pc. Size-linewidth relations using those structures show that non-thermal line-of-sight velocity dispersion varies weakly with projected size, while rms variation in the centroid velocity rises steeply with projected size. Comparing these relations, we propose that all dense gas structures in Barnard 1 have comparable depths into the sky, around 0.1-0.2 pc this suggests that overdense, parsec-scale regions within molecular clouds are better described as flattened structures rather than spherical collections of gas. Science-ready PPV cubes for Barnard 1 molecular emission are available for download.

  5. [Neuroanatomy of the Parietal Association Areas].

    Science.gov (United States)

    Kobayashi, Yasushi

    2016-11-01

    The parietal association cortex comprises the superior and inferior parietal lobules, the precuneus and the cortices in the intraparietal, parietooccipital and lunate sulci. By processing somatic, visual, acoustic and vestibular sensory information, the parietal association cortex plays a pivotal role in spatial cognition and motor control of the eyes and the extremities. Sensory information from the primary and secondary somatosensory areas enters the superior parietal lobule and is transferred to the inferior parietal lobule. Visual information is processed through the dorsal visual pathway and it reaches the inferior parietal lobule, the intraparietal sulcus and the precuneus. Acoustic information is transferred posteriorly from the primary acoustic area, and it reaches the posterior region of the inferior parietal lobule. The areas in the intraparietal sulcus project to the premotor area, the frontal eye fields, and the prefrontal area. These areas are involved in the control of ocular movements, reaching and grasping of the upper extremities, and spatial working memory. The posterior region of the inferior parietal lobule and the precuneus both project either directly, or indirectly via the posterior cingulate gyrus, to the parahippocampal and entorhinal cortices. Both these areas are strongly associated with hippocampal functions for long-term memory formation.

  6. Merging symmetry projection methods with coupled cluster theory: Lessons from the Lipkin model Hamiltonian

    Energy Technology Data Exchange (ETDEWEB)

    Wahlen-Strothman, J. M. [Rice Univ., Houston, TX (United States); Henderson, T. H. [Rice Univ., Houston, TX (United States); Hermes, M. R. [Rice Univ., Houston, TX (United States); Degroote, M. [Rice Univ., Houston, TX (United States); Qiu, Y. [Rice Univ., Houston, TX (United States); Zhao, J. [Rice Univ., Houston, TX (United States); Dukelsky, J. [Consejo Superior de Investigaciones Cientificas (CSIC), Madrid (Spain). Inst. de Estructura de la Materia; Scuseria, G. E. [Rice Univ., Houston, TX (United States)

    2018-01-03

    Coupled cluster and symmetry projected Hartree-Fock are two central paradigms in electronic structure theory. However, they are very different. Single reference coupled cluster is highly successful for treating weakly correlated systems, but fails under strong correlation unless one sacrifices good quantum numbers and works with broken-symmetry wave functions, which is unphysical for finite systems. Symmetry projection is effective for the treatment of strong correlation at the mean-field level through multireference non-orthogonal configuration interaction wavefunctions, but unlike coupled cluster, it is neither size extensive nor ideal for treating dynamic correlation. We here examine different scenarios for merging these two dissimilar theories. We carry out this exercise over the integrable Lipkin model Hamiltonian, which despite its simplicity, encompasses non-trivial physics for degenerate systems and can be solved via diagonalization for a very large number of particles. We show how symmetry projection and coupled cluster doubles individually fail in different correlation limits, whereas models that merge these two theories are highly successful over the entire phase diagram. Despite the simplicity of the Lipkin Hamiltonian, the lessons learned in this work will be useful for building an ab initio symmetry projected coupled cluster theory that we expect to be accurate in the weakly and strongly correlated limits, as well as the recoupling regime.

  7. International Arctic Seas Assessment Project (IASAP)

    International Nuclear Information System (INIS)

    Sjoeblom, K.L.; Linsley, G.S.

    1995-01-01

    The purpose of this paper was to give an overall view of the International Arctic Seas Assessment Project (IASAP). The IASAP project was initiated in 1993 to address concerns about the possible health and environmental impacts of radioactive wastes dumped in the shallow waters of the Arctic seas by the former Soviet Union. The project is being executed as a part of the IAEA's responsibilities under the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention 1972). The results and conclusions of the project are expected to be reported to the London Convention in late 1996. The objectives of the project are: 1) to assess the risks to human health and to the environment associated with the radioactive waste dumped in the Kara and Barents Seas; and 2) to examine possible remedial actions related to the dumped wastes and to advise on whether they are necessary and justified. The project is organized in five working areas: source terms, existing environmental concentrations, transfer mechanisms and models, impact assessment and remedial measures. Progress made in all working areas of IASAP is reviewed each year by a group of senior scientists (IASAP Advisory Group Meeting). During the first two years of the IASAP project, a considerable amount of new information has been produced and published as IASAP working documents. Experts from 15 countries and several international organizations are involved in the different Working Groups and Advisory Group Meetings of the project. It is planned that in addition to the report to the London Convention, which will be prepared by the Advisory Group, detailed technical reports covering the work of all areas of the IASAP will be produced. 12 refs., 3 figs., 1 tab

  8. Project W-314 specific test and evaluation plan for SN-633 transfer line (241-AX-B to 241-AY-02A)

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation

  9. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  10. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  11. Floodplain Assessment for the Middle Los Alamos Canyon Aggregate Area Investigations in Technical Area 02 at Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hathcock, Charles Dean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-22

    The proposed action being assessed in this document occurs in TA-02 in the bottom of Los Alamos Canyon. The DOE proposes to conduct soil sampling at AOC 02-011 (d), AOC 02- 011(a)(ii), and SWMU 02-005, and excavate soils in AOC 02-011(a)(ii) as part of a corrective actions effort. Additional shallow surface soil samples (soil grab samples) will be collected throughout the TA-02 area, including within the floodplain, to perform ecotoxicology studies (Figures 1 and 2). The excavation boundaries in AOC 02-011(a)(ii) are slightly within the delineated 100-year floodplain. The project will use a variety of techniques for soil sampling and remediation efforts to include hand/digging, standard hand auger/sampling, excavation using machinery such as backhoe and front end loader and small drill rig. Heavy equipment will traverse the floodplain and spoils piles will be staged in the floodplain within developed or previously disturbed areas (e.g., existing paved roads and parking areas). The project will utilize and maintain appropriate best management practices (BMPs) to contain excavated materials, and all pollutants, including oil from machinery/vehicles. The project will stabilize disturbed areas as appropriate at the end of the project.

  12. Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the installation of the SN-635 transfer line for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-635 transfer line and the tie in of SN-633 to the AY-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  13. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  14. The Sellafield repository project information programme

    Energy Technology Data Exchange (ETDEWEB)

    Curd, P J [United Kingdom Nirex Limited (United Kingdom)

    1993-07-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  15. The Sellafield repository project information programme

    International Nuclear Information System (INIS)

    Curd, P.J.

    1993-01-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  16. Project finance for alternative energy

    International Nuclear Information System (INIS)

    Mills, S.J.

    1993-01-01

    This paper is intended to provide general advice to sponsors of renewable energy projects who expect to raise project-based financing from commercial banks to fund the development of their projects. It will set out, for the benefit of such sponsors, how bankers typically approach the analysis of these undertakings and in particular the risk areas on which they concentrate. By doing so it should assist sponsors to maximise their prospects of raising bank finance. (author)

  17. Urban Greening Bay Area

    Science.gov (United States)

    Information about the San Francisco Bay Water Quality Project (SFBWQP) Urban Greening Bay Area, a large-scale effort to re-envision urban landscapes to include green infrastructure (GI) making communities more livable and reducing stormwater runoff.

  18. Natural Protected Areas and Rural/Local Development: A Sustainable Strategy in Remote Areas

    Directory of Open Access Journals (Sweden)

    Marta Pallares-Blanch

    2012-01-01

    Full Text Available The value and resources of the landscape and heritage of the Pyrenees, conserved in Natural Conservation Areas, have not been included in local social/economic development. The necessary policies and transverse working methods have not taken on board the benefits of these natural, protected areas on local, economic development. In some parts of the Pyrenees like Alt Urgell county the process of naturbanisation is just beginning. There is a great opportunity to put the brakes on uncontrolled urban development. At the same time, the potential to exploit the heritage and resources of the Pyrenees still exists. Therefore, the research defences that Natural Reserved Areas can act as a driving force to articulate a quality label of landscape, heritage and territory in peripheral areas like West Catalan Pyrenees. At the same time, by through promotion of Natural Reserved Areas a multi-organisational project of local development can be build. In the framework of rural-urban dynamics in a global context, the paper explains how the values of landscape and heritage in the mountain areas can be an opportunity to put into practice integrated territorial policies applying transversal methodologies among actors, institutions and private sector. At the same time, local development projects would priories young people and women support as one of the sector more likely to innovate and to maintain social and human capital in peripheral areas. A cooperation and collaboration practices are needed to create new economic activities with the participation of local actors. This paper puts forward suggestions for action to be taken.

  19. Crisis Communication in the Area of Risk Management: The CriCoRM Project.

    Science.gov (United States)

    Scarcella, Carmelo; Antonelli, Laura; Orizio, Grazia; Rossmann, Costanze; Ziegler, Lena; Meyer, Lisa; Garcia-Jimenez, Leonarda; Losada, Jose Carlos; Correia, Joao; Soares, Joana; Covolo, Loredana; Lirangi, Enrico; Gelatti, Umberto

    2013-09-02

    During the last H1N1 pandemic has emerged the importance of crisis communication as an essential part of health crisis management. The Project aims specifically to improve the understanding of crisis communication dynamics and effective tools and to allow public health institutions to communicate better with the public during health emergencies. THE PROJECT WILL PERFORM DIFFERENT ACTIVITIES: i) state of the art review; ii) identification of key stakeholders; iii) communicational analysis performed using data collected on stakeholder communication activities and their outcomes considering the lessons learnt from the analysis of the reasons for differing public reactions during pandemics; iv) improvement of the existing guidelines; v) development of Web 2.0 tools as web-platform and feed service and implementation of impact assessment algorithms; vi) organization of exercises and training on this issues. In the context of health security policies at an EU level, the project aims to find a common and innovative approach to health crisis communication that was displayed by differing reactions to the H1N1 pandemic policies. The focus on new social media tools aims to enhance the role of e-health, and the project aims to use these tools in the specific field of health institutions and citizens. The development of Web 2.0 tools for health crisis communication will allow an effective two-way exchange of information between public health institutions and citizens. An effective communication strategy will increase population compliance with public health recommendations. Significance for public healthThe specific aim of the project is to develop a European strategy approach on how to communicate with the population and with different stakeholders groups involved in the crisis management process, based on an analysis of the communication process during the H1N1 pandemic (content analysis of press releases, press coverage and forum discussions) and on interviews with key

  20. Socio-economic and environmental sustainability estimate of ENEL project for the S. Maria in Brasimone basin area; Valutazione della sostenibilita' socio-economica e ambientale del progetto ENEL per l'area del bacino di S. Maria del Brasimone

    Energy Technology Data Exchange (ETDEWEB)

    Padovani, L; Beone, F; Carrabba, P [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dipt. Ambiente; Lorenzelli, E; Cialani, C

    1999-07-01

    During preparatory activities of National Conference on Energy and Environment (CNEA), which took place in Rome in November 1998, the ENEA Biological Diversity Group and ENEL signed an agreement to lead a socio-economic and environmental sustainability analysis of a tourism valorisation project about an ENEL vacant, marginal, fragile or abandoned site. The activities had also the aim to be an effective contribution to individuation of future guidelines on sustainable tourism which the Convention on Biological Diversity (CBD) will discuss and issue, if possible. This work has the purpose of proposing a territorial dialogue example between many parties, which would start a local development that was sustainable, respecting local traditions. Actions proposed by ENEA are: 1. integration of a project based on environmental valorisation to tourist purpose, adding elements of respect and sustainable use of local biological diversity. 2. Analysis, through a series of medium/long term statistic model, both of the interventions proposed by ENEL and of the possible integrations suggested by ENEA. 3. Collaboration in searching for institutional funds (UE), for the achievement of the demonstrative project on sustainable tourism as regards of local biological diversity. The analysis conducts by ENEA allowed the following conclusions: the cost-benefit analysis, for the period taken into account, highlight as the project could have a positive result only if it is possible to rely on Regional or European funds. The possibility to obtain these types of funds in the fields of tourism is proportional to the consideration given into the project to the environment, to the rural development and the diversification of the income in the rural areas. Moreover, the authors suggests that the ENEL project should be wider, inclusive of more interventions, as i.e. the restoration of old building to turn into agritourism, recreational centres and hotels: the improvement of particular local