WorldWideScience

Sample records for project meeting

  1. The ITER divertor cassette project meeting

    International Nuclear Information System (INIS)

    Merola, M.; Riccardi, B.; Tivey, R.

    1999-01-01

    The Divertor Cassette Project topical meeting was held on May 26-28, 1999 at the ENEA Brasimone Research Centre in Camugnano (Bologna), Italy. Specialists from all the four Parties and the JCT participated in the meeting. It was concluded that the Divertor Cassette Project has significantly contributed to solving a large part of the critical issues of the ITER divertor design

  2. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  3. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER co-ordinated technical activities project board took place in Tokyo, Japan, on 21 January 2002, coinciding with the second Negotiators meeting (N2). Twelve participants, project board members and experts from Canada, European Union, the Russian Federation and the international team attended the meeting. The project board agreed to provide an R and D plan by June 2002, to be linked with the procurement allocation, for the period following the CTA. The ITER International Team Leader developed a proposal on establishing the working groups for drafting technical specifications for the most urgent procurement items

  4. Meeting of the ITER CTA project board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    This is information about meeting of the ITER CTA project board, which took place in Moscow, Russian Federation on 22 April 2002 on the occasion of the Third Negotiators Meeting (N3). Thirteen participants, representing PB members and experts from Canada (CA), the European Union (EU), Japan(JA), the Russian federation (RF) and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. The Project Board took note of the comments made concerning the status of the Participants Teams(PTs)

  5. The ITER Divertor Cassette Project meeting

    International Nuclear Information System (INIS)

    Akiba, M.; Tivey, R.

    2000-01-01

    The Divertor Cassette Project topical meeting took place on April 5-7, 2000 at the JAERI Naka site in Japan. The meeting focused on the progress made by the three parties under task agreements on the development of carbon-fibre composite and tungsten armored high flux plasma-facing components

  6. Medical imaging projects meet at CERN

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    ENTERVISION, the Research Training Network in 3D Digital Imaging for Cancer Radiation Therapy, successfully passed its mid-term review held at CERN on 11 January. This multidisciplinary project aims at qualifying experts in medical imaging techniques for improved hadron therapy.   ENTERVISION provides training in physics, medicine, electronics, informatics, radiobiology and engineering, as well as a wide range of soft skills, to 16 researchers of different backgrounds and nationalities. The network is funded by the European Commission within the Marie Curie Initial Training Network, and relies on the EU-funded research project ENVISION to provide a training platform for the Marie Curie researchers. The two projects hold their annual meetings jointly, allowing the young researchers to meet senior scientists and to have a full picture of the latest developments in the field beyond their individual research project. ENVISION and ENTERVISION are both co-ordinated by CERN, and the Laboratory hosts t...

  7. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  8. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER CTA Project Board (PB) took place in Toronto, Canada on 16 September 2002 on the occasion of the fifth Negotiations Meeting (N-5). Thirteen participants, PB members and experts from Canada, EU, Japan, RF and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. PB heard progress reports of the participating parties and the comments concerning the status of participants team (PT) and the IT were presented

  9. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  10. Report on the CSC project group meeting on alternative energy resources

    International Nuclear Information System (INIS)

    1977-11-01

    Under its coordinated R and D programme the Commonwealth Science Council in cooperation with the Ministry of Agriculture, Food and Consumer Affairs, Barbados, organized a meeting to identify suitable projects for inter-country collaboration. Specifically the meeting had three aims: 1. Review present state of activities in alternative energy resources and assess small scale energy needs in the region. 2. Identify specific projects for inter-country collaboration. 3. Draft joint project proposals for such collaboration. A small group of experts (Annex VII) from Britain, Canada, USA and CSC secretariat staff made detailed plans for the Barbados meeting. With a view to assessing real energy needs locally, the Group recommended that a study be undertaken in Barbados prior to the meeting. A report on such a study was presented at the meeting. Member countries were also invited to prepare country papers. In addition, following the planning Group's recommendation, several technical papers were prepared. These covered subjects ranging from conceptual aspects to clarify objectives, assumptions and criteria to a review of all alternative energy technologies

  11. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    2001-01-01

    Full text: A preparatory meeting of the Co-ordinated Technical Activities (CTA) Project Board took place in Vienna on 16 July 2001. The Board Members of Canada, EU, Japan, RF and of the CTA International Team participated in the Meeting, which was chaired by Acad. E. Velikhov. The major item on the Meeting Agenda was the discussion of the scope of the CTA. In this discussion the following comments were expressed: One of the prime objectives during the CTA is to develop technical specifications for procurement of critical items (magnets, vacuum vessel, and buildings). It was noted that the discussions with potential suppliers should confirm manufacturing processes in details in order to explore possible schedule reduction strategies. Safety analysis and licensing preparation should proceed on all proposed sites up to the preferred site designation, to ensure the overall implementation schedule is minimized and to resolve major technical issues needed for licensing. Several R and D issues remain to be further developed during the CTA. Special attention should be given by the Participants to two areas: Diagnostics; Heating and Current Drive Systems. Arrangements for continuation of the ITER Physics Expert Groups activities should be provided. To this end a new framework, called International Tokamak Physics Activity, is being planned. The Board encouraged the Participants' Representatives in the Co-ordinating committee of this activity to support the preparation for urgent Topical Group Meetings. The Board agreed that the Design Authority will be invested in the International Team and that proposals for site specific design changes should be agreed upon by the International Team Leader before being studied in detail. The Meeting agreed on some arrangements which will remain from the EDA, namely the ITER EDA Council Office in Moscow as Office of the PB Chair, and the ITER Office located at the IAEA in Vienna as agreed by the IAEA. The Board recommended that effective

  12. Talking in Taejon : regional cooperative agreement project formulation meeting

    International Nuclear Information System (INIS)

    McEwan, A. C.

    1997-01-01

    The International Atomic Energy Agency as part of its Regional Cooperative Agreement (RCA) with countries in east Asia and the neighboring Pacific, has had a project on strengthening radiation protection infrastructures operating for some years. This project has arranged training courses, workshops and other activities on a range of topics related to establishing or improving radiation protection measures and safety of radiation sources in member states of the region. A second 5 year phase of planned activities is to be concluded during 1997, and the value of the project is such that member coutntries proposed its continuation for a further 5 year period commencing in 1998. For this purpose a Task Group took the lead in assembling and evaluating proposals for consideration and approval at a meeting of national coordinators for the project held in Taejon Korea, 24-28 February. The RCA project for Phase III will be titled Enhancement and Harmonisation of Radiation Protection. The meeting of national coordinators from the region represents a unique opportunity for information sharing and cooperation in radiation protection betweem countries. (author)

  13. 77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings

    Science.gov (United States)

    2012-02-06

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...

  14. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  15. 76 FR 10944 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-28

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee will be held Tuesday...

  16. Contact expert group for international radwaste projects. Fourth meeting

    International Nuclear Information System (INIS)

    1997-06-01

    The Contact Expert Group for International Radwaste Projects is the result of an IAEA seminar on ''International Co-operation on Nuclear Waste Management in the Russian Federation'', 15-17 May 1995, that was requested and sponsored by the Nordic countries. In two working groups at the Seminar, participants from the Russian Federation and 17 countries and international organizations co-operating with the Russian Federation in waste management projects recognized the need for setting up a contact group of experts to assist in co-ordinating their efforts. Such co-ordination would help avoid redundancy and duplication of effort, assure that priority needs were made known to the international community, and provide points of contact to facilitate co-operation. This report is a compilation of the 4. CEG meeting materials, both prepared by the CEG Secretariat and presented by meeting's participants. The materials discussed by the CEG and subsequently modified are presented in the finally approved version. As in the case of previous similar reports, the documentation presented was just compiled without any editing and thus should be considered only as ''working proceedings'' of the meeting

  17. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  18. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  19. 75 FR 33893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-06-15

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  20. 75 FR 55405 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-09-10

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  1. 75 FR 18957 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-04-13

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  2. 75 FR 47348 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-08-05

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-10-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  4. 75 FR 7539 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-02-19

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  5. 75 FR 11999 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-03-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  6. 75 FR 39331 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-07-08

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  7. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-01-26

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  8. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  9. 76 FR 45006 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-07-27

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, September 26, 2011, at 3 p.m...

  10. 75 FR 47349 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-08-05

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, September 22, 2010, at 1 p.m. Eastern Time...

  11. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-09-14

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, October 24, 2011, at 3 p.m. Eastern Time...

  12. 75 FR 62632 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-10-12

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, November 24, 2010, at 1 p.m. Eastern Time via...

  13. 75 FR 39333 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-07-08

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, August 25, 2010, at 1 p.m. Eastern Time via...

  14. 76 FR 63716 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-10-13

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, November 28, 2011, at 3 p.m. Eastern Time...

  15. 76 FR 37199 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-24

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Monday, August 22, 2011, at 3 p.m. Eastern Time via...

  16. 75 FR 55406 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-09-10

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, October 27, 2010, at 1:00 p.m. Eastern Time...

  17. 76 FR 6188 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-03

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, March 28, 2011, at 2 p.m., Eastern...

  18. The Pelican Project. Meeting the needs of children with asthma

    NARCIS (Netherlands)

    Bragt, S.T.W.M. van

    2015-01-01

    The thesis, called ‘Pelican Project: Meeting the Needs of Children with asthma’ describes the importance of including personal treatment goals of children in the care of asthma. Through a health-related quality of life questionnaire, called ‘the Pelican instrument’, the treatment goals for children

  19. 77 FR 37101 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-06-20

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  20. 77 FR 40411 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-07-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  1. 77 FR 21157 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-04-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  2. 77 FR 55525 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-09-10

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. Meeting the challenges of developing LED-based projection displays

    Science.gov (United States)

    Geißler, Enrico

    2006-04-01

    The main challenge in developing a LED-based projection system is to meet the brightness requirements of the market. Therefore a balanced combination of optical, electrical and thermal parameters must be reached to achieve these performance and cost targets. This paper describes the system design methodology for a digital micromirror display (DMD) based optical engine using LEDs as the light source, starting at the basic physical and geometrical parameters of the DMD and other optical elements through characterization of the LEDs to optimizing the system performance by determining optimal driving conditions. LEDs have a luminous flux density which is just at the threshold of acceptance in projection systems and thus only a fully optimized optical system with a matched set of LEDs can be used. This work resulted in two projection engines, one for a compact pocket projector and the other for a rear projection television, both of which are currently in commercialization.

  4. 76 FR 45004 - Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Volunteer Income Tax...

  5. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2012-11-13

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  6. 78 FR 78516 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee.

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  7. 76 FR 45007 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  8. 78 FR 41193 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  9. 77 FR 47166 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-08-07

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, September 11, 2012, at 2 p.m. Eastern Time via...

  10. 76 FR 78342 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2011-12-16

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, January 10, 2012, at 2 p.m. Eastern Time via...

  11. 77 FR 2611 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-01-18

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, February 14, 2012, at 2 p.m. Eastern Time via...

  12. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-10-05

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, November 13, 2012, at 2:00 p.m. Eastern Time via...

  13. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-02-14

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Panel Face-to-Face Service Methods Project Committee will be held Tuesday, March 13, 2012, at 2 p.m...

  14. 76 FR 22171 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-04-20

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  15. 76 FR 32024 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-02

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  16. 75 FR 33894 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-06-15

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  17. 76 FR 2197 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2011-01-12

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  18. 75 FR 7540 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-02-19

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  19. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-03-31

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  20. 75 FR 18955 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2010-04-13

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  1. 75 FR 25316 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-05-07

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  2. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  3. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  4. 75 FR 39330 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  5. 75 FR 55404 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  6. Implementing Family Meetings Into a Respiratory Care Unit: A Care and Communication Quality Improvement Project.

    Science.gov (United States)

    Loeslie, Vicki; Abcejo, Ma Sunnimpha; Anderson, Claudia; Leibenguth, Emily; Mielke, Cathy; Rabatin, Jeffrey

    Substantial evidence in critical care literature identifies a lack of quality and quantity of communication between patients, families, and clinicians while in the intensive care unit. Barriers include time, multiple caregivers, communication skills, culture, language, stress, and optimal meeting space. For patients who are chronically critically ill, the need for a structured method of communication is paramount for discussion of goals of care. The objective of this quality improvement project was to identify barriers to communication, then develop, implement, and evaluate a process for semistructured family meetings in a 9-bed respiratory care unit. Using set dates and times, family meetings were offered to patients and families admitted to the respiratory care unit. Multiple avenues of communication were utilized to facilitate attendance. Utilizing evidence-based family meeting literature, a guide for family meetings was developed. Templates were developed for documentation of the family meeting in the electronic medical record. Multiple communication barriers were identified. Frequency of family meeting occurrence rose from 31% to 88%. Staff satisfaction with meeting frequency, meeting length, and discussion of congruent goals of care between patient/family and health care providers improved. Patient/family satisfaction with consistency of message between team members; understanding of medications, tests, and dismissal plan; and efficacy to address their concerns with the medical team improved. This quality improvement project was implemented to address the communication gap in the care of complex patients who require prolonged hospitalizations. By identifying this need, engaging stakeholders, and developing a family meeting plan to meet to address these needs, communication between all members of the patient's care team has improved.

  7. ECFA Meeting in May: LEP project changes / Backing for HERA / HEP in Europe

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The European Committee for Future Accelerators held a Plenary Meeting at CERN on 9 May. The representatives of the Universities and Laboratories in the CERN Member States heard presentations on the latest developments concerning the LEP project at CERN. They supported a recommendation on the HERA project at DESY and they endorsed a detailed report on high energy physics in Europe

  8. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  9. Report on the third meeting of the project advisory committee (technical) for IAEA/WHO Project EGY/6/004 (Egyptian Cancer Project) 27-29 April 1985, at NEMROCK, Cairo. PACT(3)

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1985-06-01

    The Project was launched in March 1983, with the first meeting of the Committee (PACT(I)). It was planned for a duration of four years. Now, after two years experience, PACT(III) met to review results so far and to advise on actions for the remaining two years. Appendix 1 lists those present at the meeting. Since 1983 a Pilot Project has been running at NEMROCK, the Nuclear Medicine and Radiation Oncology Centre at Cairo University Hospital, at which the Project is based. Two training courses have been given, in November 1983 and November 1984, and treatment has been given using protocols developed under the project. PACT(III) examined clinical results obtained so far and made recommendations for the extension of the scheme to other hospitals in Egypt

  10. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  11. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  12. 77 FR 30591 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-05-23

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face [[Page 30592... meeting will be held Thursday, June 7 from 8:00 a.m.-5:00 p.m. Eastern Time and Friday, June 8 from 8:00 a...

  13. 75 FR 11169 - Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12713-002] Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and Environmental Site...: Reedsport OPT Wave Park, LLC. e. Name of Project: Reedsport OPT Wave Park Project. [[Page 11170

  14. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  15. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  16. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  17. Meetings and Meeting Modeling in Smart Environments

    NARCIS (Netherlands)

    Nijholt, Antinus; op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real time or off-line. The research reported here forms part of the European 5th and 6th framework programme projects multi-modal meeting

  18. Private sector malaria RDT initiative in Nigeria: lessons from an end-of-project stakeholder engagement meeting.

    Science.gov (United States)

    Odugbemi, Babatunde; Ezeudu, Chijioke; Ekanem, Anyiekere; Kolawole, Maxwell; Akanmu, Idowu; Olawole, Aderemi; Nglass, Nkabono; Nze, Chinwe; Idenu, Edward; Audu, Bala Mohammed; Ntadom, Godwin; Alemu, Wondimagegnehu; Mpazanje, Rex; Cunningham, Jane; Akubue, Augustine; Arowolo, Tolu; Babatunde, Seye

    2018-02-06

    The malaria rapid diagnosis testing (RDT) landscape is rapidly evolving in health care delivery in Nigeria with many stakeholders playing or having potential for critical roles. A recent UNITAID grant supported a pilot project on the deployment of quality-assured RDTs among formal and informal private service outlets in three states in Nigeria. This paper describes findings from a series of stakeholder engagement meetings held at the conclusion of the project. The agreed meeting structure was a combination of plenary presentations, structured facilitated discussions, and nominal group techniques to achieve consensus. Rapporteurs recorded the meeting proceeding and summaries of the major areas of discussion and consensus points through a retrospective thematic analysis of the submitted meeting reports. Key findings indicate that private providers were confident in the use of RDTs for malaria diagnosis and believed it has improved the quality of their services. However, concerns were raised about continued access to quality-assured RDT kits. Going forward, stakeholders recommended increasing client-driven demand, and continuous training and supervision of providers through integration with existing monitoring and supervision mechanisms.

  19. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    Science.gov (United States)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  20. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  1. 14. Annual meeting of the European Society of Radiobiology and the symposium of the European Late Effects Project Group

    International Nuclear Information System (INIS)

    Charles, M.W.

    1979-03-01

    In October 1978 the Fourteenth Annual Meeting of the European Society of Radiation Biology (ESRB) and a symposium of the European Late Effects Project Group (EULEP) were held consecutively at the Kernforchungsanlage (KFA), Julich, FDR. The EULEP meeting was convened to specifically discuss the biological basis of the recommendations of publication 26 of the International Commission on Radiological Protection (ICRP). The programme of the ESRB Meeting also reflected the present interest in radiological protection. A short summary of these meetings is presented. Details of the two meetings are given in appendices which should form an introduction to, and resume of, recent developments in this field. (author)

  2. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  3. Fourth natural analogue working group meeting and Pocos de Caldas project final workshop

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1991-01-01

    The fourth meeting of the CEC-sponsored natural analogue working group (NAWG) was held in Pitlochry, Scotland, from 18 to 22 June 1990, and also included the final workshop of the Pocos de Caldas (Brazil) natural analogue project, sponsored by Nagra (CH), SKB (S) UK-DOE and US-DOE. About 80 specialists attended this meeting, originating from EC Member States and also Australia, Brazil, Canada, Finland, Japan, Sweden, Switzerland and the USA. The IAEA and OCDE-NEA were also represented. This plenary meeting was the opportunity to review and discuss five years of progress and activities of natural analogues in central areas of performance assessment: waste forms and engineered barriers, geochemistry and radionuclide speciation, radionuclide migration and the overall geological context of radwaste disposal. In addition, a feedback session provided the opportunity for regulators and those individuals who had advisory roles to give their views and impressions on the significance of natural analogue research. These proceedings, divided into two sessions, contain 32 technical papers and 14 abstracts of published papers

  4. 75 FR 13134 - Notice of Meeting

    Science.gov (United States)

    2010-03-18

    ...)(6). Grant applications for the Medical Liability and Safety Innovation Projects (R21) applications... disclosure under the above- cited statutes. SEP Meeting on: Medical Liability and Safety Innovation Projects... meeting) Place: Doubletree Bethesda Hotel & Executive Meeting Center, 8120 Wisconsin Avenue, Conference...

  5. Remedial action programs annual meeting: Meeting notes

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy Grand Junction Projects Office was pleased to host the 1987 Remedial Action programs Annual Meeting and herein presents notes from that meeting as prepared (on relatively short notice) by participants. These notes are a summary of the information derived from the workshops, case studies, and ad hoc committee reports rather than formal proceedings. The order of the materials in this report follows the actual sequence of presentations during the annual meeting

  6. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  7. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  8. Effects of the Meetings-Flow Approach on Quality Teamwork in the Training of Software Capstone Projects

    Science.gov (United States)

    Chen, Chung-Yang; Hong, Ya-Chun; Chen, Pei-Chi

    2014-01-01

    Software development relies heavily on teamwork; determining how to streamline this collaborative development is an essential training subject in computer and software engineering education. A team process known as the meetings-flow (MF) approach has recently been introduced in software capstone projects in engineering programs at various…

  9. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  10. Fifth Single-Shell Tank Integrity Project Expert Panel Meeting August 28-29, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Todd M. [Washington River Protection Solutions, LLC, Richland, WA (United States; Gunter, Jason R. [Washington River Protection Solutions, LLC, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2015-01-07

    On August 28th and 29th, 2014 the Single-Shell Tank Integrity Project (SSTIP) Expert Panel (Panel) convened in Richland, Washington. This was the Panel’s first meeting since 2011 and, as a result, was focused primarily on updating the Panel on progress in response to the past recommendations (Single-Shell Tank Integrity Expert Panel Report, RPP-RPT-45921, Rev 0, May 2010). This letter documents the Panel’s discussions and feedback on Phase I activities and results.

  11. Report of the 52. meeting of the Superior Council of the Nuclear Safety and Information (project)

    International Nuclear Information System (INIS)

    2000-01-01

    Since june 2000, the CSSIN (Superior Council on Nuclear Safety and Information) decided to present the meeting of its sessions, on the Internet site of the Nuclear Safety Authority. This document is the meeting project concerning the session of the 27 june 2000. The following subjects have been treated: the Blayais accident and its consequences; the Euratom Directive transposition on the workers and people protection; methodology and organization of the CSSIN concerning the civil nuclear installations and the radiation protection; actualization of the CSSIN heading in the Internet site of the Nuclear Safety Authority. (A.L.B.)

  12. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  13. Annotating and measuring meeting behavior

    NARCIS (Netherlands)

    van Dijk, Elisabeth M.A.G.; Nijholt, Antinus; Heylen, Dirk K.J.; Noldus, L.P.J.J.; Grieco, F; Loijens, L.W.S.; Zimmerman, P.H.

    2005-01-01

    Within the AMI (Augmented Multi-party Interaction) project technologies will be developed that can facilitate human interaction in the context of instrumented meeting rooms, which includes remote participant support and the possibility to browse through past meetings. The project collects data on

  14. E-Infrastructure Concertation Meeting

    CERN Multimedia

    Katarina Anthony

    2010-01-01

    The 8th e-Infrastructure Concertation Meeting was held in the Globe from 4 to 5 November to discuss the development of Europe’s distributed computing and storage resources.   Project leaders attend the E-Concertation Meeting at the Globe on 5 November 2010. © Corentin Chevalier E-Infrastructures have become an indispensable tool for scientific research, linking researchers to virtually unlimited e-resources like the grid. The recent e-Infrastructure Concertation Meeting brought together e-Science project leaders to discuss the development of this tool in the European context. The meeting was part of an ongoing initiative to develop a world-class e-infrastructure resource that would establish European leadership in e-Science. The e-Infrastructure Concertation Meeting was organised by the Commission Services (EC) with the support of e-ScienceTalk. “The Concertation meeting at CERN has been a great opportunity for e-ScienceTalk to meet many of the 38 new proje...

  15. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  16. Project BudBurst - Meeting the Needs of Climate Change Educators and Scientists

    Science.gov (United States)

    Henderson, S.

    2015-12-01

    It is challenging for many to get a sense of what climate change means as long periods of time are involved - like decades - which can be difficult to grasp. However, there are a number of citizen science based projects, including NEON's Project BudBurst, that provide the opportunity for both learning about climate change and advancing scientific knowledge. In this presentation, we will share lessons learned from Project BudBurst. Project BudBurst is a national citizen science initiative designed to engage the public in observations of phenological (plant life cycle) events and to increase climate literacy. Project BudBurst is important from an educational perspective, but also because it enables scientists to broaden the geographic and temporal scale of their observations. The goals of Project BudBurst are to 1) increase awareness of phenology as an area of scientific study; 2) Increase awareness of the impacts of changing climates on plants at a continental-scale; and 3) increase science literacy by engaging participants in the scientific process. It was important to better understand if and how Project BudBurst is meeting its goals. Specifically, does participation by non-experts advance scientific knowledge? Does participation advance educational goals and outcomes? Is participation an effective approach to advance/enhance science education in both formal and informal settings? Critical examination of Project BudBurst supports advancement of scientific knowledge and realization of educational objectives. Citizen science collected observations and measurements are being used by scientists as evidenced by the increase of such data in scientific publication. In addition, we found that there is a significant increase in educators utilizing citizen science as part of their instruction. Part of this increase is due to the resources and professional development materials available to educators. Working with partners also demonstrated that the needs of both science and

  17. Patient-centered family meetings in palliative care: a quality improvement project to explore a new model of family meetings with patients and families at the end of life.

    Science.gov (United States)

    Sanderson, Christine R; Cahill, Philippa J; Phillips, Jane L; Johnson, Anne; Lobb, Elizabeth A

    2017-12-01

    Family meetings in palliative care can enhance communication with family members and identify unmet needs. However, the patient's voice may not be heard. This pre and post-test quality improvement project was conducted from 2013-2014 and investigated a patient-centered family meeting, which is a different approach to palliative care family meetings, to determine its feasibility and acceptability for patients, family and the palliative care team. Newly admitted patients to an Australian in-patient specialist palliative care unit were invited to ask anyone they wished to join them in a meeting with the palliative care team and to identify issues they wished to discuss. Consenting inpatients were interviewed shortly after admission; participated in a family meeting and re-interviewed 2-3 days after the meeting. Family members provided feedback at the end of the meeting. A focus group was held with staff for feedback on this new approach for family meetings. Meetings were observed, documented and thematically analyzed. Thirty-one newly admitted patients were approached to participate in a family meeting. Eighty-four percent had family meetings and the majority (96%) was attended by the patient. Thematic analysis revealed 69% of patient-centered meetings raised end-of-life concerns and 54% were "family-focused". Patient-centered family meetings in palliative care were shown to be feasible and acceptable for staff, patients and family members. Many patients and families spontaneously shared end-of-life concerns. A patient-centered approach to family meetings that includes active patient involvement may provide additional and valued opportunities for patients and families to: express mutual concerns, deliver messages of comfort and appreciation, and prepare for death. Further investigation of this approach, including families' bereavement outcomes, is warranted.

  18. Report on the second meeting of the project advisory committee (technical) for IAEA/WHO project EGY/6/004 (Egyptian Cancer Project) 3-9 April 1984, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.G.B.

    1984-07-01

    The purpose of the meeting was to review the first year's work and make recommendations for the future. The Committee dealt mainly with the Training Course, the selection of cases suitable for treatment by simple means, the revision of treatment notes and protocols, planning for the cytology (early diagnosis) programme, the collection and manipulation of data, the extension of the Project in Egypt, and its possible extension to other countries

  19. NEDO information dissemination subcommittee. 18th project report meeting; NEDO joho fukyu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Explained in detail in a report on NEDO (New Energy and Industrial Technology Development Organization) information center activities is the exchange of information, which is accomplished through IEA (International Energy Agency) Energy Technology Data Exchange (ETDE) implementing agreement; IEA Coal Research implementing agreement; Center for the Analysis and Dissemination of Demonstrated Energy Technologies (CADDET); and IEA Greenhouse Gas Technology Information Exchange (GREENTIE). Described in relation with information dissemination activities are the opening to the public of NEDO achievement reports, NEDO Energy Database System (NEDO-EDBS), management of the library and data room, information available at Internet web sites, and so forth. Other project reports presented at the meeting include a survey of new energy actualities, publication of dedicated information journals, and so forth. At the second session of the project report meeting, a lecture is delivered, entitled Network Age and Information Distribution Revolution. (NEDO)

  20. Third ITER International Industry Liaison Meeting

    International Nuclear Information System (INIS)

    Dautovich, D.

    2000-01-01

    Following previous meetings held in 1996 in San Diego and in 1997 in Tokyo, the Third ITER International Industry Liaison Meeting (IILM) meeting was held under the European Chairmanship in Toronto, Canada, November 7-9, 2000. The intention of such meetings is to provide a forum for industrialists of the ITER EDA parties and other interested countries to develop common understandings on important issues of the timing and nature of Industry involvement in the ITER project. This article describes the main views from Industry on the preconstruction and construction phases and the cost and benefit schemes, while summarizing the progress made by the ITER project since the Tokyo meeting

  1. Notification of upcoming AGU Council meeting

    Science.gov (United States)

    Williams, Billy

    2012-10-01

    The AGU Council will meet on Sunday, 2 December 2012, at the InterContinental Hotel in San Francisco, Calif. The meeting, which is open to all AGU members, will include discussions of AGU's new Grand Challenge Project (a project that will be introduced to members at the 2012 Fall Meeting), the proposed AGU scientific ethics policy, publishing strategies, future plans for honors and recognition, and leadership transition as new members join the Council. This year the Council experimented with a new approach to conducting business. By holding virtual meetings throughout the year, Council members have been able to act in a more timely manner and provide input on important membership and science issues on the Board of Directors' agenda. The Council Leadership Team—an elected subset of the Council—also experimented with a new approach, meeting every month to keep moving projects forward. This approach has increased communication and improved effectiveness in Council decision making.

  2. African refugee and immigrant health needs: report from a community-based house meeting project.

    Science.gov (United States)

    Boise, Linda; Tuepker, Anais; Gipson, Teresa; Vigmenon, Yves; Soule, Isabelle; Onadeko, Sade

    2013-01-01

    As in other communities in the United States, information is lacking about the health needs of Africans refugees and immigrants living in Portland, Oregon. In 2008, the African Partnership for Health coalition (APH) was formed to carry out research, advocacy and education to improve the health and well-being of Africans in Oregon. This was APH's initial project. The purposes of this study were to gather data about the perceived health needs and barriers to health care Africans encounter, and lay the foundation for a program of action to guide APH's future work. Community-based participatory research (CBPR) methods were used to collect data on how to improve the health of the African community in the Portland area and define an agenda for future projects. Popular education principles guided the engagement and training of African community members, who conducted nine house meetings with 56 Africans from 14 countries. The results were analyzed by African community members and researchers and prioritized at a community meeting. Three themes emerged: The stressfulness of life in America, the challenges of gaining access to health care, and the pervasive feelings of disrespect and lack of understanding of Africans' health needs, culture, and life experiences by health providers and staff members. Using CBPR methods, we identified and prioritized the needs of the African community. This information provides a framework for future work of the African Partnership for Health and other service and advocacy groups.

  3. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  4. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  5. 17th Business Report Meeting of New Energy Industrial Technology Development Organization (NEDO). Section Meeting on International Cooperation Projects; Dai 17 kai jigyo hokokukai. Kokusai kyoryoku jigyo bunkakai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    In this section meeting, reports were made on the following themes: 1) pregrinder model project; 2) power recovery model project; 3) energy conservation model project and the importance of the spread. In 1), this model project aims to demonstrate that the electric power unit requirement for cement production can be reduced by installing a pregrinder at the front step of ball mill as the finish process at a cement factory in Indonesia, increasing capacity of ball mill grinding, and reducing operational loads of the ball mill which is large in power consumption. In 2), this project aims to supply China a technology to recover power from high temperature/high pressure exhaust gas via gas expander as electric power of 5.8MW after separating FCC catalyst associated with from the exhaust gas from the generative tower of fluid catalytic cracking equipment for oil refining. To come up to expectations for Japan from neighboring countries in Asia, NEDO Information Center carried out the energy conservation model project, etc. as the international cooperation related project in the energy/environment field. The center is now developing 10 projects. (NEDO)

  6. 75 FR 13135 - Notice of Meeting

    Science.gov (United States)

    2010-03-18

    ...). Grant applications for the Medical Liability and Safety Demonstration Projects (R18) applications are to... disclosure under the above-cited statutes. SEP Meeting on: Medical Liability and Safety Demonstration... remainder of the meeting). Place: Doubletree Bethesda Hotel & Executive Meeting Center, 8120 Wisconsin...

  7. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  8. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  9. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  10. 24 CFR 245.120 - Meeting space.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Meeting space. 245.120 Section 245... PARTICIPATION IN MULTIFAMILY HOUSING PROJECTS Tenant Organizations § 245.120 Meeting space. (a) Owners of... of any community room or other available space appropriate for meetings that is part of the...

  11. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  12. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  13. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  14. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  15. First Meeting with Teachers and Principals of Unesco Associated Schools Project Held on Monday, 6 September 1982 at the Training Division, Prime Minister's Office, Castries, Saint Lucia.

    Science.gov (United States)

    International Understanding at School, 1982

    1982-01-01

    In September 1982, K-12 teachers and principals participating in Unesco's Associated Schools Project met to make preparations for the implementation of the project that was to commence when schools opened later that month. The project is intended to promote international understanding and peace. What happened at the meeting is described. (RM)

  16. Eleventh ITER negotiations meeting (N-11) and twelfth negotiators' standing sub-group meeting (NSSG-12)

    International Nuclear Information System (INIS)

    Luo Delong

    2005-01-01

    The Eleventh ITER Negotiations Meeting (N-11) and the Twelfth Negotiators' Standing Sub-Group (NSSG-12 convened on October 19-25, 2005 at the Kempinski Hotel Chengdu, Sichuan Province. China was the host of this meeting. Delegations from China, the European Union, Japan, the Republic of Korea, the Russian Federation and the United States of America, as well as members from the International Team, met there to continue their work to reach agreement on the joint implementation of the ITER international fusion energy R and D project. The delegations accepted the Vice Minister of Science and Technology, Mr. LIU Yanhua, and State Councillor, Mr. SHI Dinghuan as Moderators for N-11 and NSSG-12, respectively, and Mr. LUO Delong as Secretary for both meetings. At the Meeting, delegates discussed and made substantial progress on a full range of legal, technical, and administrative topics, including staffing for ITER, policies for managing the project and its procurements, and the continuing joint drafting of the agreement on establishing the international ITER Organization to implement the project. Delegates also explored the possibility of India joining the Negotiations. In the light of the reports presented to the Meeting from the recent joint exploratory mission to India, delegates identified a series of steps for the near future leading towards a possible agreement among all the Parties to India's accession. The Negotiations Meeting also discussed the progress report of NSSG and forward planning and future tasks. The Negotiators agreed that substantial progress was made on all topics, and delegations are optimistic that the Joint Implementation Agreement and related Annexes and instruments could be initialed in spring of 2006. As decided by all delegations, the next Twelfth ITER Negotiations Meeting will be held in Korea on 6 December, 2005

  17. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  18. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  19. 76 FR 51938 - Southwest Mississippi Resource Advisory Committee; Meeting

    Science.gov (United States)

    2011-08-19

    ... Resource Advisory Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... review and select proposed projects. DATES: The meeting will be held September 15, 2011, 6:00 p.m...

  20. Meet-U: Educating through research immersion.

    Science.gov (United States)

    Abdollahi, Nika; Albani, Alexandre; Anthony, Eric; Baud, Agnes; Cardon, Mélissa; Clerc, Robert; Czernecki, Dariusz; Conte, Romain; David, Laurent; Delaune, Agathe; Djerroud, Samia; Fourgoux, Pauline; Guiglielmoni, Nadège; Laurentie, Jeanne; Lehmann, Nathalie; Lochard, Camille; Montagne, Rémi; Myrodia, Vasiliki; Opuu, Vaitea; Parey, Elise; Polit, Lélia; Privé, Sylvain; Quignot, Chloé; Ruiz-Cuevas, Maria; Sissoko, Mariam; Sompairac, Nicolas; Vallerix, Audrey; Verrecchia, Violaine; Delarue, Marc; Guérois, Raphael; Ponty, Yann; Sacquin-Mora, Sophie; Carbone, Alessandra; Froidevaux, Christine; Le Crom, Stéphane; Lespinet, Olivier; Weigt, Martin; Abboud, Samer; Bernardes, Juliana; Bouvier, Guillaume; Dequeker, Chloé; Ferré, Arnaud; Fuchs, Patrick; Lelandais, Gaëlle; Poulain, Pierre; Richard, Hugues; Schweke, Hugo; Laine, Elodie; Lopes, Anne

    2018-03-01

    We present a new educational initiative called Meet-U that aims to train students for collaborative work in computational biology and to bridge the gap between education and research. Meet-U mimics the setup of collaborative research projects and takes advantage of the most popular tools for collaborative work and of cloud computing. Students are grouped in teams of 4-5 people and have to realize a project from A to Z that answers a challenging question in biology. Meet-U promotes "coopetition," as the students collaborate within and across the teams and are also in competition with each other to develop the best final product. Meet-U fosters interactions between different actors of education and research through the organization of a meeting day, open to everyone, where the students present their work to a jury of researchers and jury members give research seminars. This very unique combination of education and research is strongly motivating for the students and provides a formidable opportunity for a scientific community to unite and increase its visibility. We report on our experience with Meet-U in two French universities with master's students in bioinformatics and modeling, with protein-protein docking as the subject of the course. Meet-U is easy to implement and can be straightforwardly transferred to other fields and/or universities. All the information and data are available at www.meet-u.org.

  1. Proceedings of the EuBIC developer's meeting 2018

    DEFF Research Database (Denmark)

    Willems, Sander; Bouyssié, David; Deforce, Dieter

    2018-01-01

    The inaugural European Bioinformatics Community (EuBIC) developer's meeting was held from January 9th to January 12th 2018 in Ghent, Belgium. While the meeting kicked off with an interactive keynote session featuring four internationally renowned experts in the field of computational proteomics......, its primary focus were the hands-on hackathon sessions which featured six community-proposed projects revolving around three major topics: Here, we present an overview of the scientific program of the EuBIC developer's meeting and provide a starting point for follow-up on the covered projects....

  2. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  3. Twenty-sixth general conference meeting of representatives of RCA member states. Report

    International Nuclear Information System (INIS)

    1997-10-01

    The meeting discussed the following issues: RCA Annual Report 1996; Report of the 19th RCA Working Group Meeting, Yangon Myanmar, 10-14 March 1997; RCA in the next 25 years; Development finance and the RCA; locating a senior RCA representative in the region; RCA guidelines and operating rules; TCDC activities; terminal tripartite review meeting on UNDP/RCA/IAEA project; status of new joint UNDP/RCA/IAEA project; options for the new joint project; RCA activities and budget in 1997 and 1998; reformulation and health care project; RCA proposed programme for 1999-2000; country statements; extension of RCA agreement; RCA 25th anniversary; venue and date of the 20th regular meeting of national RCA representatives

  4. Twenty-sixth general conference meeting of representatives of RCA member states. Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The meeting discussed the following issues: RCA Annual Report 1996; Report of the 19th RCA Working Group Meeting, Yangon Myanmar, 10-14 March 1997; RCA in the next 25 years; Development finance and the RCA; locating a senior RCA representative in the region; RCA guidelines and operating rules; TCDC activities; terminal tripartite review meeting on UNDP/RCA/IAEA project; status of new joint UNDP/RCA/IAEA project; options for the new joint project; RCA activities and budget in 1997 and 1998; reformulation and health care project; RCA proposed programme for 1999-2000; country statements; extension of RCA agreement; RCA 25th anniversary; venue and date of the 20th regular meeting of national RCA representatives.

  5. Thirteenth meeting of representatives of RCA Member States

    International Nuclear Information System (INIS)

    1986-07-01

    The 13th Meeting of Member States of RCA (Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology) was held on 26 September 1984 in Vienna. This document constitutes the report of that meeting. It includes the list of participants, agenda, summary of discussions, and 1984 costing table. The Report of Recommendations for the meeting consisted of the Summary Report of the Sixth RCA Working Group Meeting held in Kalpakkam, India, 20-23 March 1984. This Summary Report dealt with such topics as RCA research projects (including nuclear techniques to improve legume and buffalo production, radiosterilization of medical supplies, maintenance of nuclear instruments, isotope applications in hydrology and sedimentology), progress of the RCA/UNDP Industrial Project, and future programmes and budget

  6. Processing of Irradiated Graphite to Meet Acceptance Criteria for Waste Disposal. Results of a Coordinated Research Project

    International Nuclear Information System (INIS)

    2016-05-01

    Graphite is widely used in the nuclear industry and in research facilities and this has led to increasing amounts of irradiated graphite residing in temporary storage facilities pending disposal. This publication arises from a coordinated research project (CRP) on the processing of irradiated graphite to meet acceptance criteria for waste disposal. It presents the findings of the CRP, the general conclusions and recommendations. The topics covered include, graphite management issues, characterization of irradiated graphite, processing and treatment, immobilization and disposal. Included on the attached CD-ROM are formal reports from the participants

  7. 75 FR 40816 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2010-07-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12626-002; Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting July 7, 2010. a. Date and Time of Meeting: Thursday, July 22, 2010 from 9 a.m. to 12 p.m. CDT. b. Place: Illinois Historic Preservation...

  8. How to Catch All Those Mutations—The Report of the Third Human Variome Project Meeting, UNESCO Paris, May 2010

    Science.gov (United States)

    Kohonen-Corish, Maija R.J.; Al-Aama, Jumana Y.; Auerbach, Arleen D.; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R.; den Dunnen, Johan T.; Greenblatt, Marc S.; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G.H.

    2011-01-01

    The third Human Variome Project (HVP) Meeting “Integration and Implementation” was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10–14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access—Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access—Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. PMID:20960468

  9. How to catch all those mutations--the report of the third Human Variome Project Meeting, UNESCO Paris, May 2010.

    Science.gov (United States)

    Kohonen-Corish, Maija R J; Al-Aama, Jumana Y; Auerbach, Arleen D; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R; den Dunnen, Johan T; Greenblatt, Marc S; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G H

    2010-12-01

    The third Human Variome Project (HVP) Meeting "Integration and Implementation" was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10-14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access-Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access-Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. © 2010 Wiley-Liss, Inc.

  10. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  11. Landsat Science Team meeting: Winter 2015

    Science.gov (United States)

    Schroeder, Todd A.; Loveland, Thomas; Wulder, Michael A.; Irons, James R.

    2015-01-01

    The summer meeting of the joint U.S. Geological Survey (USGS)–NASA Landsat Science Team (LST) was held at the USGS’s Earth Resources Observation and Science (EROS) Center July 7-9, 2015, in Sioux Falls, SD. The LST co-chairs, Tom Loveland [EROS—Senior Scientist] and Jim Irons [NASA’s Goddard Space Flight Center (GSFC)—Landsat 8 Project Scientist], opened the three-day meeting on an upbeat note following the recent successful launch of the European Space Agency’s Sentinel-2 mission on June 23, 2015 (see image on page 14), and the news that work on Landsat 9 has begun, with a projected launch date of 2023.With over 60 participants in attendance, this was the largest LST meeting ever held. Meeting topics on the first day included Sustainable Land Imaging and Landsat 9 development, Landsat 7 and 8 operations and data archiving, the Landsat 8 Thermal Infrared Sensor (TIRS) stray-light issue, and the successful Sentinel-2 launch. In addition, on days two and three the LST members presented updates on their Landsat science and applications research. All presentations are available at landsat.usgs.gov/science_LST_Team_ Meetings.php.

  12. 77 FR 2286 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting a. Date and Time of Meeting: Thursday, January 26, 2012 from 11... Meeting: Commission staff will meet with Northern Illinois Hydropower, LLC to discuss potentially moving...

  13. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  14. 77 FR 2766 - Arts Advisory Panel Meeting

    Science.gov (United States)

    2012-01-19

    ... NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Arts Advisory Panel Meeting AGENCY: National Endowment for the Arts, National Foundation on the Arts and Humanities. ACTION: Notice; correction. SUMMARY... and Regional/Folk and Traditional Arts (state folk arts projects review) meeting, scheduled for...

  15. Investigating mind markers in design meetings

    NARCIS (Netherlands)

    Heylen, Dirk K.J.

    In the context of the European AMI1 project, “Augmented Multiparty Interaction��? more than one hundred hours of video and audio data have been collected of groups of four people engaged in a meeting with the task to design a new remote control. The collection of meetings is being annotated on

  16. The fourth UNDP/RCA/IAEA/meeting of national co-ordinators for radiation technology. Report

    International Nuclear Information System (INIS)

    1996-01-01

    The objectives of the Meeting were to provide information for the Terminal Report of the joint UNDP/RCA/IAEA project RAS/92/073 and to look into future activities under the Radiation Technology project. The main achievements of this Meeting are: The Meeting reviewed the implementation of all radiation technology sub-projects and agreed that all of them were successful but not yet equally developed among RCA Member States. The Meeting recommended to have three projects carried out in the form of Co-ordinated Research Programs and requested the IAEA to find new ways to implement the organized in RCA Member States to carry these CRPs out. Figs, tabs

  17. The Project of Success

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    more complicated matter than meeting targets. While success may ultimately be justified in terms of a correspondence between aims and achievements, the understanding of both aspects is highly dependent on the project process. An example of a successful project that did not meet the original performance...... targets will serve to show that success is at matter of perspective as much as it is a matter of achievement. Other types of research, e.g. social psychology, have addressed the issue of success more explicitly. I draw on such literature to conceptualize project success anew and to reestablish...

  18. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. ...

  19. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 Chairman’s remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management The CERN Press Office An update on Safety at CERN The Burotel project Reports from ACCU representatives on other committees Users’ Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria Czech Republic P. Závada (75877) Denmark...

  20. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps of Engineers, Baltimore District (Corps) for the...

  1. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  2. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. Landsat science team meeting: Summer 2015

    Science.gov (United States)

    Schroeder, Todd; Loveland, Thomas; Wulder, Michael A.; Irons, James R.

    2015-01-01

    The summer meeting of the joint U.S. Geological Survey (USGS)–NASA Landsat Science Team (LST) was held at the USGS’s Earth Resources Observation and Science (EROS) Center July 7-9, 2015, in Sioux Falls, SD. The LST co-chairs, Tom Loveland [EROS—Senior Scientist] and Jim Irons [NASA’s Goddard Space Flight Center (GSFC)—Landsat 8 Project Scientist], opened the three-day meeting on an upbeat note following the recent successful launch of the European Space Agency’s Sentinel-2 mission on June 23, 2015 (see image on page 14), and the news that work on Landsat 9 has begun, with a projected launch date of 2023.

  4. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  5. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  6. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  7. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  8. CFCC working group meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  9. Improving Family Meetings in Intensive Care Units: A Quality Improvement Curriculum.

    Science.gov (United States)

    Gruenewald, David A; Gabriel, Michelle; Rizzo, Dorothy; Luhrs, Carol A

    2017-07-01

    Family meetings in the intensive care unit are associated with beneficial outcomes for patients, their families, and health care systems, yet these meetings often do not occur in a timely, effective, reliable way. The Department of Veterans Affairs Comprehensive End-of-Life Care Implementation Center sponsored a national initiative to improve family meetings in Veterans Affairs intensive care units across the United States. Process measures of success for the initiative were identified, including development of a curriculum to support facility-based quality improvement projects to implement high-quality family meetings. Identified curriculum requirements included suitability for distance learning and applicability to many clinical intensive care units. Curriculum modules were cross-mapped to the "Plan-Do-Study-Act" model to aid in planning quality improvement projects. A questionnaire was e-mailed to users to evaluate the curriculum's effectiveness. Users rated the curriculum's effectiveness in supporting and achieving aims of the initiative as 3.6 on a scale of 0 (not effective) to 4 (very effective). Users adapted the curriculum to meet local needs. The number of users increased from 6 to 17 quality improvement teams in 2 years. All but 3 teams progressed to implementation of an action plan. Users were satisfied with the effectiveness and adaptability of a family-meeting quality improvement curriculum to support implementation of a quality improvement project in Veterans Affairs intensive care units. This tool may be useful in facilitating projects to improve the quality of family meetings in other intensive care units. ©2017 American Association of Critical-Care Nurses.

  10. Fifth technical meeting on quality

    International Nuclear Information System (INIS)

    Girard, A.

    1998-01-01

    This article reports on the 5th Technical Meeting on Quality which was held in San Diego on 20-22 October 1997 and which was attended by representatives of the Home and Joint Central Team and of manufacturers currently involved in the Large R and D projects. The meeting made progress towards the finalization of the ITER Quality Manual document for inclusion in the Final Design Report and the definition of the quality necessary for ITER procurement and construction

  11. Audio-Visual Processing in Meetings: Seven Questions and Current AMI Answers

    NARCIS (Netherlands)

    Al-Hamas, Marc; Hain, Thomas; Cernocky, Jan; Schreiber, Sascha; Poel, Mannes; Rienks, R.J.

    2007-01-01

    The project Augmented Multi-party Interaction (AMI) is concerned with the development of meeting browsers and remote meeting assistants for instrumented meeting rooms – and the required component technologies R&D themes: group dynamics, audio, visual, and multimodal processing, content abstraction,

  12. ACCU MEETING

    CERN Document Server

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  13. ACCU Meeting

    CERN Multimedia

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  14. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. La...

  15. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tThe CERN Press Office 7.\tAn update on Safety at CERN 8.\tThe Burotel project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tAny Other Business 12.\tAgenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria C...

  16. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (7...

  17. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users'Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) ...

  18. American Telemedicine Association: 18th Annual International Meeting & Tradeshow

    Directory of Open Access Journals (Sweden)

    Benjamin Forstag

    2012-12-01

    Full Text Available For 18 years, the American Telemedicine Association (ATA Annual International Meeting & Exposition has been the premier forum for professionals in the telemedicine, telehealth and mHealth space -- one of the fastest growing meetings in the country. ATA 2013 is on course to be the largest ATA meeting ever, with over 6,000 projected attendees.  The program will include 500 educational sessions and posters, highlighting the latest innovations, applications and research in telemedicine. The 2013 exhibit hall will feature nearly 300 of the leading vendors in remote healthcare technologies. With over 6000 projected attendees, from all around the world, there's no better place to meet and network with your peers and thought leaders in the field. Detailed program information--including courses, sessions and CME information--will be available January 2013 at:http://www.americantelemed.org.

  19. 113th ACCU Meeting

    CERN Multimedia

    2016-01-01

    Agenda for the meeting to be held on Tuesday, 6 September 2016​ at 9.15 a.m. in room Georges Charpak (Room F, 60-6-015).   Chairperson's remarks Adoption of the agenda      Minutes of the previous meeting News from the CERN Management Report on services from SMB Department Report on services from IT Department The International School Ferney-Voltaire / St. Genis The CERN Alumni Project Changes in rules to obtain dosimeters Changes of CHIS health insurance rules for MPAs Matters arising Any Other Business ACCU meetings 2017 Agenda for the next meeting   The Advisory Committee of CERN Users (ACCU) is a forum for discussion between the CERN Management and representatives of the CERN Users in order to review the practical means taken by CERN to support the work of Users of the Laboratory. The User Representatives to ACCU are: Austria M. Jeitler (manfred.jeitler@cern.ch) Belgium M. T...

  20. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  1. 4th Annual DOE-ERSP PI Meeting: Abstracts

    International Nuclear Information System (INIS)

    Hazen, Terry C.

    2009-01-01

    This contains abstracts from the 2009 Annual Environmental Remediation Sciences Program (ERSP) Principal Investigators (PI) Meeting. The ERSP seeks to advance fundamental science to understand, predict, and mitigate the impacts of environmental contamination from past nuclear weapons production and provide a scientific basis for the long-term stewardship of nuclear waste disposal. These ambitious goals cannot be achieved by any one project alone. Therefore, ERSP funds a combination of research programs at the DOE national laboratories, individual projects at universities and federal agencies, and large long(er)-term field site research. Integration of these activities to advance the ERSP goals is a constant challenge, but made significantly simpler by bringing together all funded ERSP researchers once a year to discuss the very latest research results. It is at these meetings where new ideas and/or scientific advancements in support of ERSP goals can be discussed and openly debated among all PIs in the program. The ERSP thrives, in part, on the new ideas, concepts, scientific connections, and collaborations generated as a result of these meetings. The annual PI Meeting is very much a working meeting with three major goals: (1) to provide opportunities for scientific interaction among the ERSP scientists, a critical element for the program; (2) to provide the ERSP program staff with an opportunity to evaluate the progress of each program and project; and (3) to showcase the ERSP to interested parties within DOE and within other federal agencies In addition to program managers from within OBER, there will be representatives from other offices within DOE and other federal agencies in attandance at the meeting.

  2. 4th Annual DOE-ERSP PI Meeting: Abstracts

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, Terry C.

    2009-03-01

    This contains abstracts from the 2009 Annual Environmental Remediation Sciences Program (ERSP) Principal Investigators (PI) Meeting. The ERSP seeks to advance fundamental science to understand, predict, and mitigate the impacts of environmental contamination from past nuclear weapons production and provide a scientific basis for the long-term stewardship of nuclear waste disposal. These ambitious goals cannot be achieved by any one project alone. Therefore, ERSP funds a combination of research programs at the DOE national laboratories, individual projects at universities and federal agencies, and large long(er)-term field site research. Integration of these activities to advance the ERSP goals is a constant challenge, but made significantly simpler by bringing together all funded ERSP researchers once a year to discuss the very latest research results. It is at these meetings where new ideas and/or scientific advancements in support of ERSP goals can be discussed and openly debated among all PIs in the program. The ERSP thrives, in part, on the new ideas, concepts, scientific connections, and collaborations generated as a result of these meetings. The annual PI Meeting is very much a working meeting with three major goals: (1) to provide opportunities for scientific interaction among the ERSP scientists, a critical element for the program; (2) to provide the ERSP program staff with an opportunity to evaluate the progress of each program and project; and (3) to showcase the ERSP to interested parties within DOE and within other federal agencies In addition to program managers from within OBER, there will be representatives from other offices within DOE and other federal agencies in attandance at the meeting.

  3. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  4. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  5. The ITER management advisory committee (MAC) meeting in Cadarache

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1999-01-01

    The ITER management advisory committee meeting was held on 8 March in Cadarache, France. The main topics were the ITER EDA Status Report in the period between the ITER Meeting in Yokohama (October 1990) and February 1999. In particular, the management advisory committee shares the director's concern about the uncertainties against which the whole project operates at present. They also noted that the definition of an appropriate framework for continued US involvement in on-going projects is a very important issue

  6. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  7. The Halden Reactor Project workshop meeting on human centred automation and function allocation methods

    International Nuclear Information System (INIS)

    Sebok, Angelia; Green, Marit; Larsen, Marit; Miberg, Ann Britt; Morisseau, Dolores

    1998-02-01

    A workshop on Human Centred Automation (HCA) and Function Allocation Methods was organised in Halden, September 29-30, 1997. The purpose of the workshop was to discuss and make recommendations on requirements for the Halden Project research agenda. The workshop meeting began with several presentations summarising current issues in HCA, Function Allocation Methods and Functional Modelling. Invited speakers presented their research or modelling efforts. Following the presentations, the workshop was divided into three working groups, all tasked with answering the same four questions: (1) What are the most important issues in Human Centred Automation? (2) Which strengths could be achieved by integrating Functional Modelling Methods into experimental Human Centred Automation research? (3) How should analytical and experimental methods be balanced? (4) What are the most important aspects in automation design methodology? Each group discussed the questions and produced specific recommendations that were summarised by the group's facilitator in a joint session of the workshop. (author)

  8. 77 FR 27417 - Sunshine Act Meetings

    Science.gov (United States)

    2012-05-10

    ... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...

  9. 75 FR 34740 - Sunshine Act Meeting

    Science.gov (United States)

    2010-06-18

    ... resolution re: Final Rule: Temporary Liquidity Guarantee Program. Memorandum re: Deposit Insurance Fund Loss, Income and Reserve Ratio Projection Update for the Restoration Plan. The meeting will be held in the...

  10. 75 FR 10813 - Notice of Public Meetings for the Steens Mountain Advisory Council

    Science.gov (United States)

    2010-03-09

    ...; November 18 and 19, 2010 in Bend, Oregon; and July 1 and 2, 2010 in Diamond, Oregon. All meeting sessions.... The July meeting will be held at the Diamond School on Diamond Lane in Diamond, Oregon. The November... Ecosystem Restoration Project implementation; Science Strategy; South Steens Water Development Project...

  11. Meet EPA Researcher Endalkachew Sahle-Demessie

    Science.gov (United States)

    Meet EPA Researcher Endalkachew Sahle-Demessie. Chemical and Environmental Engineer Endalkachew Sahle-Demessie, Ph.D., works on various projects, including nanomaterials and water resources, in EPA’s National Risk Management Research Laboratory.

  12. Low-level waste forum meeting reports

    International Nuclear Information System (INIS)

    1992-01-01

    This paper provides highlights from the summer meeting of the Low Level Radioactive Waste Forum. Topics of discussion included: responsibility for nonfuel component disposal; state experiences in facility licensing; and volume projections

  13. 76 FR 39077 - Notice of Commission Meeting and Public Hearing

    Science.gov (United States)

    2011-07-05

    ... business meeting. The conference session and business meeting both are open to the public and will be held... be held during the 1:30 p.m. business meeting include the dockets listed below. 1. Spring City... Nos. 1, 2, 3, and 5 in the Lockatong Formation and Brunswick Group. The project is located in the East...

  14. Single-Family Houses That Meet The Future Energy Demands

    DEFF Research Database (Denmark)

    Rose, Jørgen; Svendsen, Svend

    2002-01-01

    ). Before any further tightening of the regulations are introduced, however, it is necessary to illustrate the consequences of such actions with regard to finance, building technology, indoor climate and comfort. Therefore a series of investigations and experimental projects are being launched, in order...... to examine these consequences thoroughly. The department is presently contributing to this end by participating in quite a few investigative projects, where single-family houses are designed to meet the proposed future energy demands. This paper describes the results obtained from one such project where...... the department, in co-operation with a major building entrepreneur, has developed a single-family house that shows that there are no evident problems in meeting the future energy demands....

  15. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  16. Collaborative International Evaluated Library Organisation Pilot Project. CIELO meeting, NEA Headquarters, 18-20 May 2015

    International Nuclear Information System (INIS)

    Mattoon, Caleb; Brown, David; Trkov, Andrej; Plompen, Arjan; Hawari, Ayman I.; Roubtsov, Danila; Kim, Do Heon; Bauge, Eric; Palmiotti, Giuseppe; Kessedjian, Gregoire; Conlin, Jeremy Lloyd; Qian, Jing; Leal, Luiz Carlos; Chadwick, Mark; Herman, Michal Wladyslaw; White, Morgan C.; Cabellos, Oscar; Romain, Pascal; Schillebeeckx, Peter; Ichou, Raphaelle; Jacqmin, Robert; Hilaire, Stephane; Danon, Yaron; Ge, Zhigang; Malvagi, Fausto; Kahler, Albert C. Skip; Morillon, Benjamin; Mcnabb, Dennis P.; Oleynik, Dmitry S.; Wu, Haicheng; Marquez Damian, Jose Ignacio; Yokoyama, Kenji; Dunn, Michael; Cho, Young-Sik; Pignet, Sophie; Ignatyuk, Anatoly V.; Leeb, Helmut; Wang, Wenming; Ruan, Xichao

    2015-05-01

    WPEC subgroup 40-CIELO (Collaborative International Evaluated Library Organization) provides a new working paradigm to facilitate evaluated nuclear reaction data advances. It brings together experts from across the international nuclear reaction data community to identify and document discrepancies among existing evaluated data libraries, measured data, and model calculation interpretations, and aims to make progress in reconciling these discrepancies to create more accurate ENDF-formatted files. SG40-CIELO focusses on 6 important isotopes: "1H, "1"6O, "5"6Fe, "2"3"5","2"3"8U, "2"3"9Pu. This document is the proceedings of the CIELO meeting, held at the NEA Headquarters on 18-20 May 2015. It comprises all the available presentations (slides) given by the participants: A - CIELO project: - 1: Status of Cross Section Progress (M. Chadwick); - 2: Update on CIELO Related Measurements at RPI (Y. Danon); - 3: IAEA-NDS and the CIELO Project (A. Trkov); - 4: LANL Criticality Data Testing using CIELO Candidate Evaluations (S. Kahler); - 5: ENDF/B-VII.1 vs. CIELO (R. Cullen); B - O"1"6: - 6: n+"1"6O (A. Plompen); - 7: Resonance Evaluations for "1"6O for the CIELO Project (L. Leal); - 8: Validation of Leal and Hale O-16 Evaluations against FNS/JAEA Liquid Oxygen ToF Benchmark (I. Kodeli); - 9: Cierjacks 1968, Cierjacks 1980 and RPI 2015 (C.R. Lubitz); - 10: O"1"6 Items (C.R. Lubitz); C - Fe"5"6: - 11: Iron in fast neutron range, beta-0 evaluation for "5"6Fe (M. Herman); - 12: Data Evaluation at ORNL (L. Leal); - 13: IAEA-NDS and the CIELO Project Fe-56 (A. Trkov); - 14: The evaluation of experimental data in fast range for "5"6Fe (Z. Ge); D - H1 - 15: Reactivity effect of New Light and Heavy Water TSL on Critical Systems (J.I. Marquez); E - Big3: - 16: Resonance Evaluations of "2"3"5U for the CIELO Project (L. Leal); - 17: IAEA-NDS and the CIELO Project U-235 (A. Trkov); - 18: Status of "2"3"5U CIELO evaluation (B. Morillon); - 19: U"2"3"5 Items (C.R. Lubitz); - 20: Fission

  17. Oklo working group meeting

    International Nuclear Information System (INIS)

    Von Maravic, H.

    1993-01-01

    Natural analogue studies have been carried out for several years in the framework of the European Community's R and D programme on radioactive waste; and within its recent fourth five-year programme on 'Management and storage of radioactive waste (1990-94)' the Community is participating in the Oklo study, natural analogue for transfer processes in a geological repository. The Oklo project is coordinated by CEA-IPSN (F) and involves laboratories from several CEA directorates (IPSN, DTA and DCC) which collaborate with other institutions from France: CREGU, Nancy; CNRS, Strasbourg and ENSMD, Fontainebleau. Moreover, institutes from non-EC member States are also taking part in the Oklo study. The second joint CEC-CEA progress meeting of the Oklo Working Group was held in April 1992 in Brussels and gave the possibility of reviewing and discussing progress made since its first meeting in February 1991 at CEA in Fontenay-aux-Roses. About 40 participants from 15 laboratories and organizations coming from France, Canada, Gabon, Japan, Sweden and the USA underline the great interest in the ongoing research activities. The meeting focused on the different tasks within the CEC-CEA Oklo project concerning (i) field survey and sampling, (ii) characterization of the source term, (iii) studies of the petrographical and geochemical system, and (iv) studies of the hydrogeological system and hydrodynamic modelling. (author) 17 papers are presented

  18. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  19. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  20. Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session

    Energy Technology Data Exchange (ETDEWEB)

    Quinby-Hunt, Mary S.

    1992-06-08

    The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

  1. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tEmergency Services at CERN 2.\tAdoption of the agenda\t8.\tThe Meyrin Tram project 3.\tMinutes of the previous meeting9.\tReports from ACCU representatives on other committees 4.\tMatters arising10.\tUsers’ Office news 5.\tNews from the CERN Management11.\tElection of ACCU Chair 6. LHC 2008 start-up events 6.\tLogistics and transport at CERN 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Aust...

  2. ACCU meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tLHC 2008 start-up events 7.\tEmergency Services at CERN 8.\tThe Meyrin Tram project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tElection of ACCU Chair 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilq...

  3. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tCar sharing pilot project 2.\tAdoption of the agenda\t8.\tReports from ACCU representatives on other committees 3.\tMinutes of the previous meeting9.\tUsers’ Office newss 4.\tMatters arising10.\tAny Other Business 5.\tNews from the CERN Management11.\tAgenda for the next meeting 6.\tLogistics and transport at CERN Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)...

  4. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks6.\tLogistics and transport at CERN2.\tAdoption of the agenda\t7.\tCar sharing pilot project3.\tMinutes of the previous meeting8.\tReports from ACCU representatives on other committees4.\tMatters arising9.\tUsers’ Office newss5.\tNews from the CERN Management10.\tAny Other Business11.\tAgenda for the next meeting Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)Bulgaria\tPortugalP...

  5. 40 CFR 35.2218 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  6. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  7. Processing of Irradiated Graphite to Meet Acceptance Criteria for Waste Disposal. Results of a Coordinated Research Project. Companion CD-ROM

    International Nuclear Information System (INIS)

    2016-05-01

    Graphite is widely used in the nuclear industry and in research facilities and this has led to increasing amounts of irradiated graphite residing in temporary storage facilities pending disposal. This publication arises from a coordinated research project (CRP) on the processing of irradiated graphite to meet acceptance criteria for waste disposal. It presents the findings of the CRP, the general conclusions and recommendations. The topics covered include, graphite management issues, characterization of irradiated graphite, processing and treatment, immobilization and disposal. Included on the attached CD-ROM are formal reports from the participants

  8. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  9. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  10. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  11. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  12. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  13. Deceleration project bursts out of the starting-blocks

    CERN Multimedia

    Anaïs Schaeffer

    2011-01-01

    The starter's pistol was fired for the ELENA project on 28 September, with the kick-off meeting organised in collaboration with the Antiproton Decelerator Users Committee. With more than 90 scientists in attendance from 20 research centres throughout the world expressing their enthusiasm for the project…and some even more than that... the meeting was a great success.   "Our kick-off meeting was a really great success," says Stéphan Maury of the Beams (BE) Department, who is responsible for the ELENA (Extra Low ENergy Antiproton ring) project. PH Department's Walter Oelert, Chairman of the AD Users Committee and one of the instigators of the project, adds: "More than 90 participants showed up, over twice the number we were expecting! They were all very enthusiastic and eager to get ELENA off the ground." The meeting was attended by representatives of some twenty institutes from across the globe, all of whom had come to bl...

  14. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  15. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  16. 2016 Accelerators meeting

    International Nuclear Information System (INIS)

    Spiro, Michel; Revol, Jean-Luc; Biarrotte, Jean-Luc; Napoly, Olivier; Jardin, Pascal; Chautard, Frederic; Thomas, Jean Charles; Petit, Eric

    2016-09-01

    The Accelerators meeting is organised every two years by the Accelerators division of the French Society of Physics (SFP). It brings together about 50 participants during a one-day meeting. The morning sessions are devoted to scientific presentations while the afternoon is dedicated to technical visits of facilities. This document brings together the available presentations (slides): 1 - Presentation of the Ganil - Grand accelerateur national d'ions lourds/Big national heavy-ion accelerator, Caen (Jardin, Pascal); 2 - Presentation of the Accelerators division of the French Society of Physics (Revol, Jean-Luc); 3 - Forward-looking and Prospective view (Napoly, Olivier); 4 - Accelerators at the National Institute of Nuclear and particle physics, situation, Forward-looking and Prospective view (Biarrotte, Jean-Luc); 5 - GANIL-SPIRAL2, missions and goals (Thomas, Jean Charles); 6 - The SPIRAL2 project (Petit, Eric)

  17. Art meets science: The Cosmopolitan Chicken Research Project.

    Science.gov (United States)

    Stinckens, A; Vereijken, A; Ons, E; Konings, P; Van As, P; Cuppens, H; Moreau, Y; Sakai, R; Aerts, J; Goddeeris, B; Buys, N; Vanmechelen, K; Cassiman, J J

    2015-01-01

    The Cosmopolitan Chicken Project is an artistic undertaking of renowned artist Koen Vanmechelen. In this project, the artist interbreeds domestic chickens from different countries aiming at the creation of a true Cosmopolitan Chicken as a symbol for global diversity. The unifying theme is the chicken and the egg, symbols that link scientific, political, philosophical and ethical issues. The Cosmopolitan Chicken Research Project is the scientific component of this artwork. Based on state of the art genomic techniques, the project studies the effect of the crossing of chickens on the genetic diversity. Also, this research is potentially applicable to the human population. The setup of the CC®P is quite different from traditional breeding experiments: starting from the crossbreed of two purebred chickens (Mechelse Koekoek x Poule de Bresse), every generation is crossed with a few animals from another breed. For 26 of these purebred and crossbred populations, genetic diversity was measured (1) under the assumption that populations were sufficiently large to maintain all informative SNP within a generation and (2) under the circumstances of the CCP breeding experiment. Under the first assumption, a steady increase in genetic diversity was witnessed over the consecutive generations, thus indeed indicating the creation of a "Cosmopolitan Chicken Genome". However, under the conditions of the CCP, which reflects the reality within the human population, diversity is seen to fluctuate within given boundaries instead of steadily increasing. A reflection on this might be that this is because, in humans, an evolutionary optimum in genetic diversity is reached. Key words.

  18. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  19. 76 FR 42684 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Science.gov (United States)

    2011-07-19

    .... SUMMARY: The Mid-Atlantic Fishery Management Council Staff will hold a meeting of the Visioning Project Advisory Panel to discuss communications strategies and data gathering tools for the Visioning Project... project's results to develop future management actions. Although non-emergency issues not contained in...

  20. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  1. 4th meeting on advanced pulsed-neutron research on quantum functions in nano-scale materials

    International Nuclear Information System (INIS)

    2006-07-01

    Toward the worldwide realization of high-intensity pulsed neutron source, KEK (High Energy Accelerator Research Organization) proceeds the research by composing 6 research groups as neutron science initiation base to initiate new neutron science. The papers generalizing the researches for 2 years were presented at this meeting. KENS (Neutron Science Laboratory, KEK) shut down on March 22nd in 2006, and KEK will continue the research utilizing the pulsed neutron by using foreign facilities until the completion of J-PARC from now on. At international session in this meeting, the accomplishments and future prospects about the Japan-United Kingdom science and technology collaboration project, and about the research collaboration projects with IPNS (Intense Pulsed Neutron Source, ANL) and LANSCE (Los Alamos Neutron Science Center) were presented. Especially in the latter projects, the first accomplishment was reported under the present agreement. In addition, Meeting on structural study of proteins in aqueous solutions' and 'Meeting on hydrogen quantum atomics study' were held as satellite meetings. (J.P.N)

  2. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  3. Report of the IAEA/RCA-NDT education project

    International Nuclear Information System (INIS)

    Ooka, Kiichi; Terada, Kunio; Ohtani, Kiyoshi; Niwa, Noboru.

    1988-01-01

    The Japan Non-Destructive Test (NDT) Association has been carried out an NDT technical education project with support from IAEA. Phase I of the project was successfully completed last year. The present report briefly outlines the second five-year plan (Phase II) to be carried out under the project. The project was first established in 1981 after receiving a request from IAEA to provide NDT education for participants from the RCA countries (13 countries in Asian and Pacific area). Phase I was mainly designed to provide lectures on NDT techniques. Prior to the start of Phase II, the International Education Subcommittee was established in December 1986 to take the leadership in carrying out Phase II of the project. In addition, the NDT Expert Working Group (formally called Advisory Group) has been installed which consists of representative from Japan. Australia India and Singapore. The Group held nine meetings during Phase I. Three lecture meetings at Singapore and another three at Tokyo were held to provide education according to a plan developed by the Group. It has been decided that Japan be support the lecture meetings to be held during Phase II. To conduct such meetings, a group comprising all of the National Coordinators from the RCA countries was set up to replace the Working Group. The National Coordinator Conference was held four times since its establishment. (N.K.)

  4. Report of the IAEA/RCA-NDT education project

    Energy Technology Data Exchange (ETDEWEB)

    Ooka, Kiichi; Terada, Kunio; Ohtani, Kiyoshi; Niwa, Noboru

    1988-11-01

    The Japan Non-Destructive Test (NDT) Association has been carried out an NDT technical education project with support from IAEA. Phase I of the project was successfully completed last year. The present report briefly outlines the second five-year plan (Phase II) to be carried out under the project. The project was first established in 1981 after receiving a request from IAEA to provide NDT education for participants from the RCA countries (13 countries in Asian and Pacific area). Phase I was mainly designed to provide lectures on NDT techniques. Prior to the start of Phase II, the International Education Subcommittee was established in December 1986 to take the leadership in carrying out Phase II of the project. In addition, the NDT Expert Working Group (formally called Advisory Group) has been installed which consists of representative from Japan. Australia India and Singapore. The Group held nine meetings during Phase I. Three lecture meetings at Singapore and another three at Tokyo were held to provide education according to a plan developed by the Group. It has been decided that Japan be support the lecture meetings to be held during Phase II. To conduct such meetings, a group comprising all of the National Coordinators from the RCA countries was set up to replace the Working Group. The National Coordinator Conference was held four times since its establishment. (N.K.).

  5. 77 FR 12553 - Sunshine Act Meetings

    Science.gov (United States)

    2012-03-01

    ... COMMISSION ON CIVIL RIGHTS Sunshine Act Meetings AGENCY: United States Commission on Civil Rights... Discussion of Projects: VRA Statutory Enforcement Report Update Human Trafficking Briefing Update Immigration... Discussion on Agency Staffing V. State Advisory Committee Issues: Review of two Hawaii SAC applicants Re...

  6. Setting Ambitious yet Achievable Targets Using Probabilistic Projections: Meeting Demand for Family Planning.

    Science.gov (United States)

    Kantorová, Vladimíra; New, Jin Rou; Biddlecom, Ann; Alkema, Leontine

    2017-09-01

    In 2015, governments adopted 17 internationally agreed goals to ensure progress and well-being in the economic, social, and environmental dimensions of sustainable development. These new goals present a challenge for countries to set empirical targets that are ambitious yet achievable and that can account for different starting points and rates of progress. We used probabilistic projections of family planning indicators, based on a global data set and Bayesian hierarchical modeling, to generate illustrative targets at the country level. Targets were defined as the percentage of demand for family planning satisfied with modern contraceptive methods where a country has at least a 10 percent chance of reaching the target by 2030. National targets for 2030 ranged from below 50 percent of demand satisfied with modern contraceptives (for three countries in Africa) to above 90 percent (for 41 countries from all major areas of the world). The probabilistic approach also identified countries for which a global fixed target value of 75 percent demand satisfied was either unambitious or has little chance of achievement. We present the web-based Family Planning Estimation Tool (FPET) enabling national decision makers to compute and assess targets for meeting family planning demand. © 2017 The Population Council, Inc.

  7. 78 FR 44103 - Announcement of Public Meetings To Receive Comments on Draft Solicitation for Advanced Fossil...

    Science.gov (United States)

    2013-07-23

    ... Advanced Fossil Energy Projects AGENCY: U.S. Department of Energy. ACTION: Notice of public meetings to... a potential future solicitation announcement for Federal Loan Guarantees for Advanced Fossil Energy... Guarantees for Advanced Fossil Energy Projects are invited to attend any of the meetings listed in DATES. To...

  8. Astro tourism: Astro Izery project

    Science.gov (United States)

    Mrozek, Tomasz; Kołomański, Sylwester; Żakowicz, Grzegorz; Kornafel, Stanisław; Czarnecki, Tomasz L.; Suchan, Pavel; Kamiński, Zbigniew

    2015-03-01

    The Astro Izery project is carried by several institutions from Poland and Czech Republic. Its aim is to educate and inform tourists, who visit the Izery Mountains, about astronomy and light pollution. The project consists of two activities: permanent (sundials, planetary path etc.) and periodic (meetings, workshops). After five years the project is in good health and will gain more elements in next years.

  9. STANDING CONCERTATION COMMITTEE OCTOBER 1999 ORDINARY MEETING

    CERN Document Server

    1999-01-01

    Original: FrenchThe meeting was mainly devoted to the examination of the items below, to which the Committee had allocated two meetings:Preparation for the meeting of TREF on 19 November 1999The SCC took note of the agenda for that meeting which includes additional information on the long-term care insurance project, a second report on staff recruitment and retention, a status report on the voluntary programmes (especially an assessment of the Progressive Retirement Programme), a proposal for the application of the cost-of-living index for 2000, an addendum to the technical amendments to be made to the Staff Rules and Regulations, a balance sheet of CERN's apprenticeship programmes and a status report with regard to guarantees for the pensions of members of the personnel in the event of the dissolution of the Organization.Long-term care: TREF would be given further information following the comments made when the Management's initial proposals were presented to the Forum at its September meeting. The informat...

  10. 76 FR 30373 - National Institute of Allergy and Infectious Diseases; Meeting

    Science.gov (United States)

    2011-05-25

    ... Allergy and Infectious Diseases; Meeting Notice of Closed Meeting Pursuant to section 10(d) of the Federal... Infectious Diseases Special Emphasis Panel; NIAID Investigator Initiated Program Project Applications (P01... Research; 93.856, Microbiology and Infectious Diseases Research, National Institutes of Health, HHS) Dated...

  11. Fermilab History and Archives Project | Home

    Science.gov (United States)

    Special Events Early Users Meetings (1979 - 1989) The Tevatron Natural History Discoveries Technology Site Fermilab History and Archives Project Fermilab History and Archives Project Fermi National Accelerator Laboratory Home About the Archives History & Archives Online Request Contact Us Site Index

  12. Introduction to the Asian Energy Security project: Project organization and methodologies

    International Nuclear Information System (INIS)

    Hippel, David von; Savage, Timothy; Hayes, Peter

    2011-01-01

    The spectacular recent economic growth in the Asia-Pacific region in general, and in many of the economies of Northeast Asia in particular, has spurred a vast expansion in the need for energy services, and an expansion in the demand for the fuels that help to supply these services. Future projections suggest that the growth of fossil fuel use in Northeast Asia, especially in China, will have major consequences for financial and fuel markets and pollution both regionally and globally. Before the project described in this paper was initiated, there was no ongoing forum for energy experts from all of the countries of the region to meet, informally and in an unofficial capacity, to discuss openly and in a targeted fashion the energy situations in their countries, and to work together to evaluate the energy efficiency costs and benefits of different ways of meeting regional demand. The Asian Energy Security (AES) project provides such a forum, and as such constitutes a unique resource in the engagement of the countries of Northeast Asia on the topic of energy security.

  13. EURO HAWK Project Overview

    National Research Council Canada - National Science Library

    2003-01-01

    Briefing charts from presentation on a EURO HAWK project overview; an airborne system with stand-off capability for wide-area intelligence, surveillance and reconnaissance meeting European NATO countries' ISR requirements...

  14. A Formula for Fixing Troubled Projects: The Scientific Method Meets Leadership

    Science.gov (United States)

    Wagner, Sandra

    2006-01-01

    This presentation focuses on project management, specifically addressing project issues using the scientific method of problem-solving. Two sample projects where this methodology has been applied are provided.

  15. DTUsat the Ideal CDIO project

    DEFF Research Database (Denmark)

    Fléron, René

    2016-01-01

    -disciplinary collaboration and all the devils buried in the details of realizing any theoretical project is barely touched upon. The CDIO approach aims to simulate this and thereby prepare the students to meet the challenges of an engineering job. Whereas the standard student project at DTU involves one to three students...

  16. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  17. International Meeting on Languages, Applied Linguistics and Translation

    OpenAIRE

    Guerra, Luis

    2012-01-01

    This meeting aims at providing an overview of the current theory and practice, exploring new directions and emerging trends, sharing good practice, and exchanging information regarding foreign languages, applied linguistics and translation. The meeting is an excellent opportunity for the presentation of current or previous language learning and translation projects funded by the European Commission or by other sources. Proposals are invited for one or more of the following topics, in any of t...

  18. Co-ordinated research project on comparative international studies of osteoporosis using isotope techniques. Report on the final research co-ordination meeting

    International Nuclear Information System (INIS)

    2002-01-01

    In 1994, the International Atomic Energy Agency started the five-year Co-ordinated Research Project (CRP) on Comparative International Studies of Osteoporosis Using Isotope Techniques. The objectives of this study were: To harmonize the techniques of measuring BMD within the participating countries and to obtain data that can be compared between the different study groups (countries); To determine whether early adult PBM varies between populations over the age range from 15 to 50 years. In other words, to determine the age of peak bone mass in selected populations from developing countries; To explore environmental and nutritional contributions to any determined differences. Further information about the purpose and scope of the CRP may be found in the report of the Advisory Group Meeting (AGM) held in 19921 and other reports of this CRP. The fourth Research Co-ordination Meeting (RCM) for participants of the CRP, which is the subject of the present report, was held at the University of Sheffield Medical School; WHO Collaborating Center for Metabolic Bone Diseases in Sheffield, UK from 28 Feb. to 3 March 2000

  19. 100TH ACCU MEETING

    CERN Multimedia

    2013-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 4 June 2013 at 9:15 a.m. in room 60-6-002.   1. Chairperson's remarks 2. Adoption of the agenda      3. Minutes of the previous meeting 4. 25 years of ACCU 5. News from the CERN Management 6. Report on services from GS department 7. Status of the Health Insurance Project for Users 8. Users’ Office News 9. Public WiFi at CERN 10. Reports from ACCU representatives on other Committees a. Restaurants' Supervisory Committee 11. Matters arising 12. Any Other Business 13. Agenda for the next meeting   Anyone wishing to raise any points under “Any Other Business” is invited to send them to the Chairperson in writing or by e-mail. Michael Hauschild (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Re...

  20. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, Dianne [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings (CARB) on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  1. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, D.

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  2. 24 CFR 1003.303 - Project rating.

    Science.gov (United States)

    2010-04-01

    ... address the quality and cost effectiveness of the proposed project, the commitment to sustain the proposed... meets the threshold requirements shall be competitively rated within each Area ONAP's jurisdiction under... project costs. (e) Comprehensiveness and coordination. This factor will address the extent to which the...

  3. 78 FR 23960 - Annual Public Meeting

    Science.gov (United States)

    2013-04-23

    ... annual open public meeting. The Foundation will provide an overview of its history, project updates, as... p.m. Time allotted for each registrant will be 3 minutes. The contact person will notify interested... individuals interested in making formal comments should notify the contact person and submit a brief statement...

  4. Proceedings of the 49th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2015-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of several results of joint usage and collaborative researches performed in the institute. The 49th KURRI Scientific Meeting will be held for two days on January 28 and 29 in 2015. The contents of the meeting are as follows (the numbers of the right column are those of the presentations): 1) Topic lectures (4), 2) New comer lectures (1), 3) Presentations of the results of the project researches terminating this fiscal year (6), 4) Special lectures given by retiring faculty members (2), 5) Poster presentations (37). This issue is the collection of 50 papers presented at the entitled meeting. The 3 of the presented papers are indexed individually. (J.P.N.)

  5. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  6. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    Science.gov (United States)

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  7. 76 FR 72009 - Sunshine Act Notice-December 8, 2011 Board of Directors Meeting

    Science.gov (United States)

    2011-11-21

    .... 2. Insurance Project--Middle East and Africa. 3. Finance Project--Maghreb and North Africa. 4... Closed Session of the October 27, 2011 Board of Directors Meeting. 6. Pending Major Projects. Written summaries of the projects to be presented will be posted on OPIC's Web site on or about November 17, 2011...

  8. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE No. 98-D-453

    International Nuclear Information System (INIS)

    HOLSTEIN, W.A.

    1999-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, WA., currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration. Use of this document is described in the Project Hanford Policy and Procedure System under HNF-PRO-1999, Construction Program Conceptual Phase

  9. Barakah Project in UAE

    Energy Technology Data Exchange (ETDEWEB)

    Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)

    2014-07-01

    This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.

  10. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  11. Management of water hyacinth. A CSC/UNEP project. Progress report

    International Nuclear Information System (INIS)

    1981-05-01

    The water hyacinth project was initially proposed at the Regional Workshop on Rural Technology held at Dacca in January 1978. In November 1978, national coordinators met at New Delhi and outlined the project in detail as reported in CSC(79)RT-4. The meeting was attended by delegates from Bangladesh, Egypt, Guyana, India, Malaysia, Papua New Guinea, Sri Lanka, Commonwealth Science Council and the United Nations Environment Programme. Following this a proposal was submitted to UNEP seeking funding support to meet the external cost component of the project. This support was subsequently granted. The project aims to achieve an integrated approach towards managing water hyacinth. The underlying intention was that management would cover both eradication of the plant as well as making productive use of it when possible. Productive uses envisaged include biogas synthesis, production of papers and boards and as a source of proteins. Another interesting possibility is the use of the plant to control industrial as well as domestic water pollution . All these were detailed in a three and a half year time plan. The project had its first review meeting in June 1979 in Papua New Guinea. The major intention of this meeting was to examine status reports from each country in an attempt to quantify the problem caused by water hyacinth and assess the work plan in relation to this. The report of this meeting has been published as CSC(79)RT-5. At this meeting Papua New Guinea decided to withdraw from this project as water hyacinth was not regarded as a severe problem. The use of dugong as a control agent was not recommended by Papua New Guinea. In April 1980 an interim review meeting attended by the Regional Coordinator and representatives of UNEP and CSC was held in London where, based on the progress made in the participating countries, activities and time schedules were refined and sharpened (CSC (80)RT-16). It look some time to resolve the external funding question . It was

  12. FAO/IAEA consultants' meeting on integrated approach for improving small scale market oriented dairy systems. Report

    International Nuclear Information System (INIS)

    2002-01-01

    A Consultants' Meeting was held at IAEA, Vienna from 21-24 August 2000 to discuss the need for, and to develop an FAO/IAEA Co-ordinated Research Project (CRP) to demonstrate increases in the productivity of small scale market oriented dairy systems using an integrated approach to improving nutrition, reproductive management and disease control. The meeting was attended by five consultants with expertise in specific aspects of research and development in dairy production, three external resource persons who were funded from their own institutes, a staff member of FAO's Animal Production Service, a representative of the IAEA's Department of Technical Co-operation and staff members of the Joint FAO/IAEA Division's Subprogramme on Animal Production and Health. The list of participants is given. The specific objectives of the meeting were to: Review the current research thrusts that are relevant to the objectives of the project, recommend areas that should be included and determine the most appropriate modalities for supporting these activities; Define the scientific scope of the project and recommend appropriate technologies and methods that should be applied in field and laboratory studies for obtaining the necessary information; Review the background document which has been prepared and make appropriate improvements and modifications; and Develop work plans, time scales, schedule of Research Co-ordination Meetings (RCMs) and the project framework matrix. The meeting was formally opened by Dr Martyn Jeggo, Head of the Animal Production and Health Section, who outlined the Sub-programme's mandate, medium-term strategy and how the planned CRP fits into this strategy. Dr Oswin Perera, the Scientific Secretary of the meeting, outlined the previous activities of the Sub-programme in animal nutrition and reproduction, discussed the background to the proposed project, and presented the objectives and expected outcomes of the meeting. The consultants and resource persons

  13. 42 CFR 56.603 - Project elements.

    Science.gov (United States)

    2010-10-01

    ... set forth in the most recent CSA Poverty Income Guidelines (42 CFR 1060.2) (except that nominal fees... statistical data, cost accounting, management information, and reporting or monitoring systems which will meet the project's management needs and shall enable the project to provide such statistics and other...

  14. 7 CFR 1944.514 - Comprehensive TSA grant projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Comprehensive TSA grant projects. 1944.514 Section... § 1944.514 Comprehensive TSA grant projects. (a) The rural area to be covered by the TSA project must be...) Consideration of the following items may assist applicants develop TSA projects which meet the needs of low...

  15. DGMK spring meeting of Fachbereich Aufsuchung und Gewinnung

    International Nuclear Information System (INIS)

    2002-01-01

    The report of the meeting contains 42 articles on the subjects DGMK project ''tight gas reservoirs'', geophysics, petroleum geology, drilling technique, petroleum and natural gas transport technique and underground storage of natural gas. (UKE) [de

  16. Biomarkers: project update from the GRAPPA 2012 annual meeting.

    Science.gov (United States)

    FitzGerald, Oliver; Mease, Philip J

    2013-08-01

    For members of the Group for Research and Assessment of Psoriasis and Psoriatic Arthritis (GRAPPA), an important goal has been the identification of soluble biomarkers in psoriatic arthritis that might predict the development of radiographic progression. Work over the past year has resulted in approval of a draft protocol, and an announcement is forthcoming of the outcome of an assessment process for centers that applied to manage the project. GRAPPA is now ready to commence formal negotiations with potential funding partners and intends to initiate this project in the near future.

  17. Summary report of the third research co-ordination meeting on measurement, calculation and evaluation of photon production data

    International Nuclear Information System (INIS)

    Oblozinsky, P.

    1998-01-01

    The present report contains the account of the last meeting of the Co-ordinated Research Project on ''Measurement, Calculation and Evaluation of Photon Production Data''. In addition to the summary of the meeting, the overall results achieved under the project in 1994-1997 are summarized, including the list of publications. The status of work on the Final Report of the project is also given. (author)

  18. Proceedings of the 48th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2014-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of a part of the results of joint usage and collaborative researches performed in the institute. The 48th KURRI Scientific Meeting will be held for two days on January 30 and 31 in 2014. The contents of the meeting are as follows: 1) Topic 4, 2) New comer lectures 3, 3) Presentations of the results of the project researches terminating this fiscal year 4, 4) Special lectures given by retiring faculty members 0, 5) Poster presentations 35. We hope that this proceedings will contribute to keep records of and let the public know of research activities in the institute. This issue is the collection of 46 papers presented at the entitled meeting. The 22 of the presented papers are indexed individually. (J.P.N.)

  19. UAS Integration in the NAS Project Test Site Kick-off Meeting

    Science.gov (United States)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  20. Fourth ITER negotiations meeting. Site offers from European Union and Japan join Canada's

    International Nuclear Information System (INIS)

    Rager, J.-P.

    2002-01-01

    The Fourth ITER Negotiations Meeting took place in Cadarache, France on 4-6 June, 2002. The European Union hosted the meeting, which was also attended by delegations from Canada, Japan and Russian Federation. During the Meeting the delegations informed each other of the latest developments concerning the ITER project in their respective countries. ITER potential site offers from EU and Japan were proposed

  1. Community Gardening, Neighborhood Meetings, and Social Capital

    Science.gov (United States)

    Alaimo, Katherine; Reischl, Thomas M.; Allen, Julie Ober

    2010-01-01

    This study examined associations between participation in community gardening/beautification projects and neighborhood meetings with perceptions of social capital at both the individual and neighborhood levels. Data were analyzed from a cross-sectional stratified random telephone survey conducted in Flint, Michigan (N=1916). Hierarchical linear…

  2. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  3. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    2001-01-01

    The divertor ''Large Project'' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  4. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    1999-01-01

    The divertor 'Large Project' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  5. Meeting Objectives and Relevant NDS Databases

    International Nuclear Information System (INIS)

    Simakov, S.P.

    2012-01-01

    The purpose of the meeting was to find ways to overcome the drawbacks of the NRT standard and benefit from the recent developments in primary radiation damage simulations, the Technical Meeting had the objectives to discuss: - revisiting the NRT standard with the purpose of improving it by the evaluation of uncertainties connected with recoil spectra and the energy partitioning model; - proposal of a new upgraded standard that will capture the annealing of defects in the recoil cascade on the basis of MD, BCA and other models. As an outcome of discussions, the definition of objectives and participating organisations for a new Coordinated Research Project (CRP) on this topic are expected

  6. 76 FR 5820 - Meeting Announcements: North American Wetlands Conservation Council; Neotropical Migratory Bird...

    Science.gov (United States)

    2011-02-02

    ..., 114 Stat. 593, July 20, 2000), will hold its meeting to discuss the strategic direction and management... NW., Washington, DC 20037. FOR FURTHER INFORMATION CONTACT: Michael J. Johnson, Council Coordinator...- Federal Council meets to consider wetland acquisition, restoration, enhancement, and management projects...

  7. Hybrid petacomputing meets cosmology: The Roadrunner Universe project

    International Nuclear Information System (INIS)

    Habib, Salman; Pope, Adrian; Lukic, Zarija; Daniel, David; Fasel, Patricia; Desai, Nehal; Heitmann, Katrin; Hsu, Chung-Hsing; Ankeny, Lee; Mark, Graham; Bhattacharya, Suman; Ahrens, James

    2009-01-01

    The target of the Roadrunner Universe project at Los Alamos National Laboratory is a set of very large cosmological N-body simulation runs on the hybrid supercomputer Roadrunner, the world's first petaflop platform. Roadrunner's architecture presents opportunities and difficulties characteristic of next-generation supercomputing. We describe a new code designed to optimize performance and scalability by explicitly matching the underlying algorithms to the machine architecture, and by using the physics of the problem as an essential aid in this process. While applications will differ in specific exploits, we believe that such a design process will become increasingly important in the future. The Roadrunner Universe project code, MC 3 (Mesh-based Cosmology Code on the Cell), uses grid and direct particle methods to balance the capabilities of Roadrunner's conventional (Opteron) and accelerator (Cell BE) layers. Mirrored particle caches and spectral techniques are used to overcome communication bandwidth limitations and possible difficulties with complicated particle-grid interaction templates.

  8. Conferences in historical geography – traditional interdisciplinary meetings

    Czech Academy of Sciences Publication Activity Database

    Semotanová, Eva; Chodějovská, Eva; Šimůnek, Robert

    2012-01-01

    Roč. 38, č. 1 (2012), s. 222-227 ISSN 0323-0988 R&D Projects: GA ČR(CZ) GBP410/12/G113 Institutional support: RVO:67985963 Keywords : history * historical geography * interdisciplinary meetings Subject RIV: AB - History

  9. 2014 Accelerators meeting, Grenoble

    International Nuclear Information System (INIS)

    Lucotte, Arnaud; Lamy, Thierry; De Conto, Jean-Marie; Fontaine, Alain; Revol, Jean-Luc; Nadolski, Laurent S.; Kazamias, Sophie; Vretenar, Maurizio; Ferrando, Philippe; Laune, Bernard; Vedrine, Pierre

    2014-10-01

    The Accelerators meeting is organised every two years by the Accelerators division of the French Society of Physics (SFP). It brings together about 50 participants during a one-day meeting. The morning sessions are devoted to scientific presentations while the afternoon is dedicated to technical visits of facilities. This document brings together the available presentations (slides): 1 - Presentation of the Laboratory of subatomic physics and cosmology - LPSC-Grenoble (Lucotte, Arnaud; Lamy, Thierry); 2 - Presentation of the Accelerators division of the French Society of Physics (Fontaine, Alain; Revol, Jean-Luc); 3 - Presentation of Grenoble's master diplomas in Accelerator physics (Nadolski, Laurent S.); 4 - Presentation of Paris' master diplomas in big instruments (Kazamias, Sophie); 5 - Particle accelerators and European Union's projects (Vretenar, Maurizio); 6 - French research infrastructures (Ferrando, Philippe); 7 - Coordination of accelerators activity in France (Laune, Bernard; Vedrine, Pierre)

  10. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  11. Project Administration Techniques for Successful Classroom Collaborative Writing.

    Science.gov (United States)

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  12. Meeting Quay 2k30's requirements

    NARCIS (Netherlands)

    Wijnants, G.H.; Toorn, A. van der; Schuylenburg, M.; Heijnen, H.P.J.; Gijt, J.G. de; Molenaar, W.F.; Ligteringen, H.; Krom, A.H.M.

    2005-01-01

    The requirements that a quay design should meet in order to yield a viable port infrastructure, vary widely from flexibility due to future customers requirements to durability due to owners requirements. In a Port of Rotterdam backed project, current and future requirements have been aggregated by

  13. 18th Meeting of the IFRC Subcommittee on Atomic and Molecular Data for Fusion. Summary Report of an IAEA Technical Meeting

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-12-01

    The 18th meeting of the Subcommittee on Atomic and Molecular Data of the International Fusion Research Council (IFRC) was held on 26-27 April 2012 at IAEA Headquarters in Vienna, Austria. Activities of the Atomic and Molecular Data Unit for the period 2010-2012 were reviewed and recommendations were made for continuig activitiees in 2012-2013 and for new projects in the 2014-2015 budget cycle. The proceedings, conclusions and recommendations of the Subcommittee meeting are briefly described in this report. Specific recommendations of the Subcommittee from this meeting, as well as the report on the activities of the IAEA Atomic and Molecular Data Unit for the period May 2010 - April 2012, are also included. (author)

  14. 77 FR 59967 - Notice of Public Meeting: Northwest California Resource Advisory Council

    Science.gov (United States)

    2012-10-01

    ..., food and beverages. On November 15, the council meets from 8 a.m. to 2 p.m. at the King Range Project... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAN01000.L18200000.XZ0000] Notice of Public Meeting: Northwest California Resource Advisory Council AGENCY: Bureau of Land Management...

  15. Getting Ready for the Human Phenome Project

    DEFF Research Database (Denmark)

    Oetting, William S; Robinson, Peter N; Greenblatt, Marc S

    2013-01-01

    A forum of the Human Variome Project (HVP) was held as a satellite to the 2012 Annual Meeting of the American Society of Human Genetics in San Francisco, California. The theme of this meeting was "Getting Ready for the Human Phenome Project". Understanding the genetic contribution to both rare si...... for studies attempting to identify novel disease genes or causative genetic variants. Improved systems and tools that enhance the collection of phenotype data from clinicians are urgently needed. This meeting begins the HVP's effort towards this important goal....... the impact of genetic variation on disease. To this end, there needs to be a greater sharing of phenotype and genotype data. For this to occur, the many databases that currently exist will need to become interoperable to allow for the combining of cohorts with similar phenotypes to increase statistical power...

  16. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    Science.gov (United States)

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  17. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  18. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  19. University Research Consortium annual review meeting program

    International Nuclear Information System (INIS)

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators

  20. University Research Consortium annual review meeting program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators.

  1. Sixth users meeting for the Advanced Photon Source: Proceedings

    International Nuclear Information System (INIS)

    1994-12-01

    Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, advances in synchrotron radiation applications, and technical developments at the APS. The actions taken at the 1994 Business Meeting of the Advanced Photon Source Users Organization are also documented here

  2. Sixth users meeting for the Advanced Photon Source: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, advances in synchrotron radiation applications, and technical developments at the APS. The actions taken at the 1994 Business Meeting of the Advanced Photon Source Users Organization are also documented here.

  3. 2D Presentation Techniques of Mind-maps for Blind Meeting Participants.

    Science.gov (United States)

    Pölzer, Stephan; Miesenberger, Klaus

    2015-01-01

    Mind-maps, used as ideation technique in co-located meetings (e.g. in brainstorming sessions), which meet with increased importance in business and education, show considerably accessibility challenges for blind meeting participants. Besides an overview of general aspects of accessibility issues in co-located meetings, this paper focuses on the design and development of alternative non-visual presentation techniques for mind-maps. The different aspects of serialized presentation techniques (e.g. treeview) for Braille and audio rendering and two dimensional presentation techniques (e.g. tactile two dimensional array matrix and edge-projection method [1]) are discussed based on the user feedback gathered in intermediate tests following a user centered design approach.

  4. Proceedings of the 50th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2016-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of several results of joint usage and collaborative researches performed in the institute. The 50th KURRI Scientific Meeting will be held for two days on January 27th and 28th, 2016. The contents of the meeting are as follows (the numbers of the right column are those of the presentations): 1) Topic lectures (3), 2) New corner lectures (2), 3) Presentations of the results of the project researches terminating this fiscal year (2), 4) Special lectures given by retiring faculty members (3), 5) Poster presentations (41). We hope that this proceedings book will contribute to keep records of and let the public know of research activities in the institute. (author)

  5. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  6. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  7. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  8. Forty-Fourth Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2011-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 43rd TWG-FR Annual Meeting, including the status of the actions; - Consider topical technical meeting arrangements for 2012-2013, as well as review FR-related activities included in the IAEA Project&Budget (P&B) biennium 2012-2013; - Review the IAEA’s ongoing information exchange and coordinated research projects in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, ESNII, etc.)

  9. Senior Project: Mentoring--The Art of Becoming. [Videotape].

    Science.gov (United States)

    Southeastern Regional Vision for Education (SERVE), Tallahassee, FL.

    Mentoring is an integral part of SERVE's Senior Project program. Mentors provide support and guidance to students as they complete the requirements of Senior Project by meeting with them to offer input on their research papers and assistance with the design and implementation of their projects. Approximately 100 schools in SERVE's 6-state region…

  10. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  11. Proceedings of the first meeting of IEA, Bioenergy, Task 17

    Energy Technology Data Exchange (ETDEWEB)

    Christersson, L.; Ledin, S. [eds.

    1999-07-01

    The present proceedings are the result of the first meeting of Task 17 within the frame of IEA, Bioenergy. During the meeting the objectives of Task 17 were discussed and determined to be: * to stimulate the full-scale implementation of energy crops in participating countries; * to strengthen the contacts and co-operation between participating countries, scientists, biomass producers, machine developers, entrepreneurs, and end users; * to select the most urgent research and development areas, and to suggest projects of co-operation; * to deliver Proceedings from the meetings, and * to inform Ex-Co-members. Separate abstracts have been prepared for all the 7 papers presented.

  12. Proceedings of the 47th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2013-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of a part of the results of joint usage and collaborative researches performed in the institute. The 47th KURRI Scientific Meeting will be held for two days on January 29 and 30 in 2013. The contents of the meeting are as follows: 1) Topic lectures (4), 2) New comer lectures (2), 3) Presentations of the results of the project researches terminating this fiscal year (1), 4) Special lectures given by retiring faculty members (4), 5) Poster presentations (35). (The numbers in the right column are those of the presentations). We hope that this proceedings will contribute to keep records of and let the public know of the research activities in the institute. From this issue, the proceedings are published as a KUR series. The 39 of 46 papers presented at the entitled meeting are indexed individually. (J.P.N.)

  13. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  14. Summary Report of Third Research Coordination Meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Gunsing, Frank; Otsuka, Naohiko

    2010-12-01

    The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. (author)

  15. ICFA: Protvino meeting looks at trends in international collaboration

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-01-15

    International collaboration is the lifeblood of Big Science, and in high energy physics the triennial 'Future Perspectives' meeting organized by the International Committee for Future Accelerators (ICFA) provides a valuable opportunity to reappraise trends in this collaboration. The latest meeting was held in October at Protvino, near Moscow, where the Institute for High Energy Physics is the scene of construction work for the 21-kilometre UNK proton rings and the projected home of a big new linear collider for electrons and positrons.

  16. Biases in Project Escalation : Names, frames & construal levels

    NARCIS (Netherlands)

    N. Benschop (Nick)

    2016-01-01

    markdownabstractSummary The importance of information systems to organizations continues to grow. Large sums of money are invested in information system (IS) projects. However, many IS projects fail to meet their targets or even fail completely. In the effort to successfully control such

  17. Project PROBE, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In its second year of operation, Project PROBE (Professions Oriented Bilingual Education) experienced difficulty in meeting some of its instructional objectives. The project had sought to provide instructional and supportive services to 200 Spanish-speaking students from Latin America at Louis D. Brandeis High School (Manhattan, New York) and to…

  18. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  19. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  20. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  1. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  2. Developing and evaluating a meeting assistant test bed

    NARCIS (Netherlands)

    Post, W.M.; Lincoln, M.

    2008-01-01

    A test bed has been developed in which participants are tasked to work in simulated, scenario based, projects in which face-to-face and remote meetings of about 45 minutes have to be held. Measures on performance, team factors and remote aspects are automatically collected with electronic

  3. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  4. 78 FR 17634 - Agenda and Notice of Public Meetings of the Colorado Advisory Committee

    Science.gov (United States)

    2013-03-22

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that an orientation meeting... Room, Denver, CO 80202. The meetings are to conduct an orientation and for project planning. Members of... Regional Office at 303-866-1040. Persons needing accessibility services should contact the Rocky Mountain...

  5. ICFA: Protvino meeting looks at trends in international collaboration

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    International collaboration is the lifeblood of Big Science, and in high energy physics the triennial 'Future Perspectives' meeting organized by the International Committee for Future Accelerators (ICFA) provides a valuable opportunity to reappraise trends in this collaboration. The latest meeting was held in October at Protvino, near Moscow, where the Institute for High Energy Physics is the scene of construction work for the 21-kilometre UNK proton rings and the projected home of a big new linear collider for electrons and positrons

  6. Craniofacial morphology in unoperated infants with isolated cleft palate. A cephalometric analysis in three projections

    DEFF Research Database (Denmark)

    Hermann, N.V.; Kreiborg, S.; Jensen, B.L.

    58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections......58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections...

  7. 77 FR 43344 - Notice of ACHP Quarterly Business Meeting

    Science.gov (United States)

    2012-07-24

    ... ADVISORY COUNCIL ON HISTORIC PRESERVATION Notice of ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice. SUMMARY: Notice is hereby given that the... Program Comment on Bridges D. Executive Order on Infrastructure Projects VII. New Business VIII. Adjourn...

  8. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  9. 77 FR 68102 - Programs and Research Projects Affecting the Arctic; 99th Meeting

    Science.gov (United States)

    2012-11-15

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... planning to attend who requires special accessibility features and/or auxiliary aids, such as sign language...

  10. Expert Meeting Report: Transforming Existing Buildings through New Media - An Idea Exchange

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Stacy [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-05-01

    This report describes results of a Building America expert meeting on September 13, 2011, in Las Vegas, Nevada, hosted by the Building America Retrofit Alliance (BARA). This meeting provided a forum for presentations and discussions on the use of new media to work with remodelers and retrofit projects to improve energy efficiency and deliver research results from the Building America program to remodelers.

  11. Expert Meeting Report: Transforming Existing Buildings through New Media--An Idea Exchange

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, S.

    2012-05-01

    This report describes results of a Building America expert meeting on September 13, 2011, in Las Vegas, Nevada, hosted by the Building America Retrofit Alliance (BARA). This meeting provided a forum for presentations and discussions on the use of new media to work with remodelers and retrofit projects to improve energy efficiency and deliver research results from the Building America program to remodelers.

  12. 44 CFR 78.11 - Minimum project eligibility criteria.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  13. Twenty Years on: Reflections on the CEDISYS Project

    DEFF Research Database (Denmark)

    Boudol, Gerard; Castellani, Ilaria; Hennessy, Matthew

    2008-01-01

    We recall some memories of the Esprit Basic Research Action CEDISYS, a small, well-focussed and fruitful project which brought together researchers at the meeting point of true concurrency and process algebra, in the period 1988-1991. The project was initiated and effectively animated by Ugo...

  14. Getting ready for the Human Phenome Project: the 2012 forum of the Human Variome Project.

    Science.gov (United States)

    Oetting, William S; Robinson, Peter N; Greenblatt, Marc S; Cotton, Richard G; Beck, Tim; Carey, John C; Doelken, Sandra C; Girdea, Marta; Groza, Tudor; Hamilton, Carol M; Hamosh, Ada; Kerner, Berit; MacArthur, Jacqueline A L; Maglott, Donna R; Mons, Barend; Rehm, Heidi L; Schofield, Paul N; Searle, Beverly A; Smedley, Damian; Smith, Cynthia L; Bernstein, Inge Thomsen; Zankl, Andreas; Zhao, Eric Y

    2013-04-01

    A forum of the Human Variome Project (HVP) was held as a satellite to the 2012 Annual Meeting of the American Society of Human Genetics in San Francisco, California. The theme of this meeting was "Getting Ready for the Human Phenome Project." Understanding the genetic contribution to both rare single-gene "Mendelian" disorders and more complex common diseases will require integration of research efforts among many fields and better defined phenotypes. The HVP is dedicated to bringing together researchers and research populations throughout the world to provide the resources to investigate the impact of genetic variation on disease. To this end, there needs to be a greater sharing of phenotype and genotype data. For this to occur, many databases that currently exist will need to become interoperable to allow for the combining of cohorts with similar phenotypes to increase statistical power for studies attempting to identify novel disease genes or causative genetic variants. Improved systems and tools that enhance the collection of phenotype data from clinicians are urgently needed. This meeting begins the HVP's effort toward this important goal. © 2013 Wiley Periodicals, Inc.

  15. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Science.gov (United States)

    2011-09-08

    ..., and physical and cyber security systems. The new JOC also must meet State essential service criteria... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings for the Joint Operations Center Relocation Project...

  16. 77 FR 42482 - Reports and Updates on Arctic Research Programs and Projects; Meetings

    Science.gov (United States)

    2012-07-19

    ..., filing of petitions and applications and agency #0;statements of organization and functions are examples... needs in advance of the meeting. Contact person for further information: John Farrell, Executive...

  17. Proceedings of the fourth users meeting for the advanced photon source

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The Fourth Users Meeting for the Advanced Photon Source (APS) was held on May 7--8, 1991 at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project; critical issues for APS operation; advances in synchrotron radiation applications; users perspectives, and funding perspectives. The actions taken at the 1991 Business Meeting of the Advanced Photon Source Users Organization are also documented.

  18. Proceedings of the fourth users meeting for the advanced photon source

    International Nuclear Information System (INIS)

    1992-02-01

    The Fourth Users Meeting for the Advanced Photon Source (APS) was held on May 7--8, 1991 at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project; critical issues for APS operation; advances in synchrotron radiation applications; users perspectives, and funding perspectives. The actions taken at the 1991 Business Meeting of the Advanced Photon Source Users Organization are also documented

  19. Yucca Mountain Project bibliography, January--June 1989

    International Nuclear Information System (INIS)

    Henline, D.M.; Bales, J.D.

    1990-03-01

    This update contains information on the Yucca Mountain Project that was added to the Energy Data Base (EDB) during the first six months of 1989. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. The update is categorized by principal project participant organizations, and items are arranged in chronological order according to publication date. Participant-sponsored subcontractor reports, meeting papers, and journal articles are included with sponsoring organization

  20. Use of a structured template to facilitate practice-based learning and improvement projects.

    Science.gov (United States)

    McClain, Elizabeth K; Babbott, Stewart F; Tsue, Terance T; Girod, Douglas A; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg

    2012-06-01

    The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008-2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level.

  1. Studying Student Benefits of Assigning a Service-Learning Project Compared to a Traditional Final Project in a Business Statistics Class

    Science.gov (United States)

    Phelps, Amy L.; Dostilio, Lina

    2008-01-01

    The present study addresses the efficacy of using service-learning methods to meet the GAISE guidelines (http://www.amstat.org/education/gaise/GAISECollege.htm) in a second business statistics course and further explores potential advantages of assigning a service-learning (SL) project as compared to the traditional statistics project assignment.…

  2. EXPLORING PROJECT-RELATED FACTORS THAT INFLUENCE LEADERSHIP STYLES AND THEIR EFFECT ON PROJECT PERFORMANCE: A CONCEPTUAL FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Suzaan Pretorius

    2017-12-01

    Full Text Available It is widely accepted that project leaders should adapt their behaviour to meet the unique leadership demands of a variety of situations. Recently, vertical, shared, and horizontal styles of leadership have gained prominence, especially in the project management literature. Several factors are believed to play a role in determining an appropriate balance between these leadership styles. This theoretical study explores the influence of project types, the stage in the project life cycle, organisational project management maturity, and the level of trust and collaboration between project team members on the appropriate balance of leadership styles in projects. This paper presents a conceptual framework of these factors, while empirical results will be reported on in the sequel to this paper.

  3. 77 FR 42751 - Advisory Committee for Women's Services; Notice of Meeting

    Science.gov (United States)

    2012-07-20

    ... Project Launch and the Fetal Alcohol Syndrome Disorder Center for Excellence and discussions regarding... Microsoft Office 2007 Live Meeting. Interested persons may present data, information, or views, orally or in...

  4. 76 FR 26252 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Science.gov (United States)

    2011-05-06

    ... development, University of Maryland MSE Study, Surfclam Ocean Quahog Excessive Share Project, and ACL/AM... meeting date. Dated: May 3, 2011. Tracey L. Thompson, Acting Director, Office of Sustainable Fisheries...

  5. Nineteenth International Microgravity Measurements Group Meeting

    Science.gov (United States)

    DeLombard, Richard (Compiler)

    2000-01-01

    The Microgravity Measurements Group meetings provide a forum for an exchange of information and ideas about various aspects of microgravity acceleration research in international microgravity research programs. These meetings are sponsored by the PI Microgravity Services (PIMS) project at the NASA Glenn Research Center. The 19th MGMG meeting was held 11-13 July 2000 at the Sheraton Airport Hotel in Cleveland, Ohio. The 44 attendees represented NASA, other space agencies, universities, and commercial companies; 8 of the attendees were international representatives from Japan, Italy, Canada, Russia, and Germany. Twenty-seven presentations were made on a variety of microgravity environment topics including the International Space Station (ISS), acceleration measurement and analysis results, science effects from microgravity accelerations, vibration isolation, free flyer satellites, ground testing, vehicle characterization, and microgravity outreach and education. The meeting participants also toured three microgravity-related facilities at the NASA Glenn Research Center. Contained within the minutes is the conference agenda, which indicates each speaker, the title of their presentation, and the actual time of their presentation. The minutes also include the charts for each presentation, which indicate the authors' name(s) and affiliation. In some cases, a separate written report was submitted and has been Included here

  6. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  7. Second negotiation meeting on the joint implementation of ITER

    International Nuclear Information System (INIS)

    Okumura, Y.

    2002-01-01

    The second negotiation meeting on the joint implementation of ITER was held in Tokyo(Japan) on 22-23 January 2002 to continue formal negotiations on the joint implementation of the ITER project. The delegations from Japan, European Union, Canada and Russia reached common understanding on some of the Joint Implementation Agreement (JIA) related issues. The delegations requested the Negotiators' Standing Subgroup (NSSG) to further elaborate the draft JIA and to submit second draft to the third Negotiation Meeting. The delegations accepted the revised Work Plan and Milestones for the negotiations process

  8. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  9. Meeting the energy needs of the northeast : the role for LNG

    International Nuclear Information System (INIS)

    Van der Put, J.

    2004-01-01

    This presentation outlined the role of liquefied natural gas (LNG) in meeting the energy requirements of the northeastern regions of the United States and Canada, as seen from the perspective of TransCanada. The need for LNG to meet projected growth in natural gas demand was presented in the context of a business model for TransCanada's entry into the LNG market. A plan for the successful siting and construction of import terminals in various strategic locations in the Northeast was presented. Issues surrounding supply and demand for LNG in North America, with specific reference to the Northeastern regions, were examined. Tables of existing import terminals were presented. Forecasts of demand growth were provided as well as details of natural gas transmission and power assets. A detailed description of the Fairwinds Project included existing and proposed pipelines, site descriptions and an outline of a stakeholder engagement campaign with examples of support and opposition as well as community impacts of the project. A behavioral guideline suggested that specific commitments should be made rather than generalized promises. A list of lessons learned from the Fairwinds project was also included. The potential to land LNG in Quebec was examined, with details of the rationale behind the proposed projects, shipping distance advantages and ice management. 16 figs

  10. Summary report of the 1. research co-ordination meeting on compilation and evaluation of photonuclear data for applications

    International Nuclear Information System (INIS)

    1997-04-01

    The present report contains the summary of the first Research Co-ordination Meeting on ''Compilation and Evaluation of Photonuclear Data for Applications'', held in Obninsk, Russia, from 3 to 6 December 1996. The project aims to produce a Technical Document on Photonuclear Data Library for Applications and to develop an IAEA Photonuclear Data Library. Summarized are the conclusions and recommendations of the meeting together with a detailed list of actions. Attached is the information sheet on the project, the agenda of the meeting and the list of participants along with extended abstracts of their presentations. Refs, figs, tabs

  11. 6th CTF3 Collaboration Meeting

    CERN Document Server

    2000-01-01

    The sixth CTF3 collaboration meeting was held at CERN from the 1st to the 2nd November 2000. This meeting was devoted to the CTF3 combiner ring, delay loop and transfer lines, with the participation of members of the CLIC study group at CERN and of collaborators from INFN-Frascati. The CTF3 status has been summarized by the project leader, and several members of the INFN-Frascati group have presented an overview of the design activity of the different components. Working group sessions have been held on beam optics, on diagnostics and equipment and on RF deflectors. The main conclusions from the working groups have been reported at the end of the meeting. Issues that have been addressed include prototype design and construction (RF deflectors, path-length tuning wigglers, extraction kicker and vacuum chamber sections) and deadlines for component specifications. The impedance budget for the ring, delay loop and transfer lines, its impact on the choice of beam-position monitors and the problem of beam stability...

  12. Role and future subjects of support project 'research activity on radiation etc. by high school students'

    International Nuclear Information System (INIS)

    Iimoto, Takeshi; Fujimoto, Noboru; Nakamura, Takashi

    2014-01-01

    This is a report of the project of MEXT(The Ministry of Education, Culture, Sports, Science and Technology) to support high school students researching radiation etc. This subject research consists of an exchange meeting, independence research, and a presentation meeting of the results. Media introduced the project and this was a very reputable project. However, regrettably this support project was broken off in the business year of 2012. In this document, the outline of the support project for seven years is introduced and the possibility of future deployment is discussed. (author)

  13. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  14. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  15. Indico MEETING tutorial

    CERN Multimedia

    CERN. Geneva; Manzoni, Alex Marc; Dimou, Maria

    2017-01-01

    This short tutorial explains how to create a MEETING in indico, how to populate the timetable, write minutes and how to add material. If you are only interested in the timetable part, please slide to 03.39, for the minutes to 07.46 and for adding material to 08.29.   Tell us what you think via e-learning.support at cern.ch More tutorials in the e-learning collection of the CERN Document Server (CDS) http://cds.cern.ch/collection/E-learning%20modules?ln=en All info about the CERN rapid e-learning project is linked from http://twiki.cern.ch/ELearning  

  16. MANAGEMENT BOARD MEETING OF 20 MAY 1999

    CERN Document Server

    1999-01-01

    For informationOutcome of the May Meeting of the Scientific Policy CommitteeThe Director-General reported that the Scientific Policy Committee had extensively examined the draft medium-term plan 'The Scientific Activities of CERN and Budget Estimates for the Years 2000-2003' at its meeting on 10 May and that a final version taking account of observations made was now being prepared for submission to the Council at its June session for approval. In addition, following detailed discussion of a written proposal concerning the long-baseline neutrino beam from CERN to Gran Sasso, the NGS facility, the Committee had expressed support for the project and was preparing a recommendation to be presented to the Committee of Council the following month.Preparation for the June Meetings of the Scientific Policy Committee, Finance Committee and Committee of Council and for the June Council SessionThe Director-General outlined the main issues to be addressed by the Council and its committees in June. In addition to the two ...

  17. MANAGEMENT BOARD MEETING OF 30 SEPTEMBER 1999

    CERN Multimedia

    1999-01-01

    For informationOutcome of the September meetings of the Scientific Policy Committee, Finance Committee and Committee of Council.The Management Board's September meeting was mainly devoted to a review of the recent meetings of the Scientific Policy Committee, Finance Committee and Committee of Council. The Director-General reported on the following highlights:LHC Status ReportStatus reports on the LHC machine presented by L. Evans, the LHC Project Leader, had been well received by the Scientific Policy Committee and Committee of Council, which had expressed satisfaction at the progress made. Informing them of an accident that had occurred during the testing of the first long LHC dipole as an illustration of problems encountered and successfully overcome, Dr Evans had explained that sparking in the 15-m dipole had resulted in significant external damage and an unprotected quench. After re-tuning, however, the magnet had been successfully re-powered to reach well above the nominal field at first quench, thus dem...

  18. Analysis of Nordic educational projects designed to meet challenges in society

    DEFF Research Database (Denmark)

    Liveng, Anne; Manninen, Jyri; Àrnason, Hróbjartur

    , process or structure identified in the successful projects: 1.Networking: Planning, implementation and development of the programme is based on networking of various - and even unexpected - organizations and players/participants. 2.Process evaluation: Continuous project development, documentation...... and analysis of results is inte-grated in the project, using Process Evaluation or Action Research 3.Flexibility: Programme offers flexible access and participation, individualized content or individualized study methods (ICT) 4.Focus on needs: A programme focuses on authentic regional, sectorial or individual...... learning providers, trade unions and other agencies supporting human development to create learning inter-ventions to address specific crisis, challenges or changes. In view of recent crises experienced by the Nordic countries The Education and Training Service Centre in Ice-land (www.frae.is) proposed...

  19. 76 FR 37805 - Progress Energy Carolinas; Notice of Meeting

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Progress Energy Carolinas; Notice of Meeting On May 31, 2011, Progress Energy Carolinas (Progress Energy), licensee for the... National Marine Fisheries Service (NMFS) and staff to discuss what is needed to complete formal...

  20. 39 CFR 6.1 - Regular meetings, annual meeting.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Regular meetings, annual meeting. 6.1 Section 6.1 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE MEETINGS (ARTICLE VI) § 6.1 Regular meetings, annual meeting. The Board shall meet regularly on a schedule...

  1. Technical aspects of atomic and molecular data processing and exchange. 19. meeting of the A+M Data Centres and ALADDIN Network. Summary report of an IAEA technical meeting

    International Nuclear Information System (INIS)

    Humbert, D.

    2008-05-01

    The proceedings of the IAEA Technical Meeting on Technical Aspects of Atomic and Molecular Data Processing and Exchange (19th Meeting of A+M Data Centres and ALADDIN Network), held on 3-5 October, 2007 in Vienna, Austria, are briefly described. Conclusions and recommendations are presented concerning various proposed projects and their priorities involving A+M data compilation and evaluation and technical aspects of data processing, exchange, and distribution. (author)

  2. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  3. HIFS VNL Monthly Progress Report Preparation for NDCX-II Project

    International Nuclear Information System (INIS)

    Logan, Grant; Kwan, Joe; Barnard, John; Friedman, Alex; Gilson, Erik; Leitner, Matthaeus; Waldron, Will; Bieniosek, Frank

    2009-01-01

    In preparation for the project and for anticipated review in August, the HIFS-VNL hosted an NDCX-II Advisory Meeting at LBNL on May 27, 2009. A number of experts in accelerator physics, engineering, and construction were asked to visit for a full day, listen to presentations on the project, its goals, and its status, and to offer their advice on how best to proceed, what topics needed attention, and what technical options seemed most attractive to them. This was a productive meeting, and the Committee's comments will provide useful guidance.

  4. HB-Line Special Nuclear Material Campaigns: Model-Based Project Management

    International Nuclear Information System (INIS)

    CHANG, ROBERT

    2004-01-01

    This study is to show how a model was used to enable management to better estimate production capabilities to ensure contract milestones/commitments are met, to cope with fast changing project baselines and project missions, to ensure the project will meet the negotiated throughput, and to eliminate unnecessary but costly design changes

  5. Linking pre-meeting communication to meeting effectiveness

    NARCIS (Netherlands)

    Allen, J.A.; Lehmann-Willenbrock, N.K.; Landowski, N.

    2014-01-01

    Purpose – The purpose of this paper is to investigate the importance of communication that occurs just before workplace meetings (i.e. pre-meeting talk). The paper explores how four specific types of pre-meeting talk (small talk, work talk, meeting preparatory talk, and shop talk) impact

  6. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    Science.gov (United States)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  7. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  8. International Working Group on Life Management of Nuclear Power Plants regular meeting. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    The aim of this meeting is to review the IWG activities in 1992-1993, other relevant activities, national programmes, projects of international organizations and provide recommendations of the Agency's activities, forward programmes in this area, priority scope and content of publications and meetings to be organized and sponsored by the Agency. Refs, figs and tabs

  9. 75 FR 33576 - Tehama County Resource Advisory Committee; Meeting

    Science.gov (United States)

    2010-06-14

    ... (RAC) will meet in Red Bluff, California. Agenda items to be covered include: (1) Introductions; (2) approval of minutes; (3) public comment; (4) Chairman's perspective; (5) project presentations; (6) next.... Individuals wishing to speak or propose agenda items must send their names and proposals to Randy Jero...

  10. Regenerating America: Meeting the Challenge of Building Local Economies.

    Science.gov (United States)

    Gabel, Medard; And Others

    The document includes five papers on the implications and applications of regeneration by the Regeneration Project, based in Emmaus, Pa. The first paper, "Regenerating America: Meeting the Challenge of Building Local Economies," (Medard Gabel) defines regeneration as economic recovery and growth, fostered by diversification within a…

  11. Expert Meeting Report. Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A. [NAHB Research Center, Upper Marlboro, MD (United States); Wiehagen, J. [NAHB Research Center, Upper Marlboro, MD (United States)

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic focused on efforts to increase the efficiency of existing homes, specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  12. Meetings and meeting modeling in smart surroundings

    NARCIS (Netherlands)

    op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.; Nijholt, Antinus; Nishida, T.

    2004-01-01

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real-time or off-line. Intelligent real-time and off-line generation requires understanding of what is going on during a meeting. The

  13. Treatment Algorithm for the Hypertension Specialist after the Milan Meeting in 2007

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    2007-01-01

    Roč. 30 (2007), s. 374-374 ISSN 1420-4096. [Central European Meeting on Hypertension and Cardiovascular Disease Prevention. 11.10.2007-13.10.2007, Kraków] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : hypertension specialist * treatment algorithm for the hypertension * treatment after the Milan Meeting in 2007 Subject RIV: FA - Cardiovascular Disease s incl. Cardiotharic Surgery

  14. A2e High Fidelity Modeling: Strategic Planning Meetings

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, Steven W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprague, Michael A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Womble, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barone, Matt [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    Atmosphere to electrons (A2e) is a multi-year U.S. Department of Energy (DOE) research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through whole wind farms. Better insight into the flow physics of large multi-turbine arrays will address the plant-level energy losses, is likely to reduce annual operational costs by hundreds of millions of dollars, and will improve project financing terms to more closely resemble traditional capital projects. In support of this initiative, two planning meetings were convened, bringing together professionals from universities, national laboratories, and industry to discuss wind plant modeling challenges, requirements, best practices, and priorities. This report documents the combined work of the two meetings and serves as a key part of the foundation for the A2e/HFM effort for predictive modeling of whole wind plant physics.

  15. Tenth working group meeting of representatives of RCA Member States. Report

    International Nuclear Information System (INIS)

    1989-04-01

    The Tenth RCA (Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology) Working Group meeting of representatives of RCA Member States was held at the Chinese Academy of Agricultural Sciences, Beijing, between 11-14 April 1988. The report on the meeting consists of a presentation of the seven technical sessions which dealt with topics such as nuclear techniques in industry, agriculture and medicine, nuclear power and of the project reports under RCA

  16. Summary report of consultants' meeting on nuclear data of charged-particle interactions for medical therapy applications

    International Nuclear Information System (INIS)

    Capote Noy, R.; Vatnitskiy, S.

    2007-01-01

    A summary is given of a Consultants' Meeting assembled to assess the viability of a new IAEA Co-ordinated Research Project (CRP) on Charged-Particle Interaction Data for Radiotherapy. The need for a programme to compile and evaluate charged-particle nuclear data for therapeutic applications was strongly agreed. Both the technical discussions and the expected outcomes of such a project are described, along with detailed recommendations for implementation. The meeting was jointly organized by NAPC/Nuclear Data Section and NAHU/Dosimetry and Medical Radiation Physics Section. (author)

  17. Effect of participation in the Fadama–II project on Participants' socio ...

    African Journals Online (AJOL)

    For most respondents, the socioeconomic status changed positively following participation in the project. Majority of the respondents in the study area participated actively in fadama meetings and other activities involved in project. Benefits derived from taking part in the project were generally high for most respondents (95.5 ...

  18. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    Science.gov (United States)

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  19. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  20. MANAGEMENT BOARD MEETING OF 13th MARCH 2003

    CERN Multimedia

    2003-01-01

    Status of Earned Value Management (EVM) J. Ferguson, the EVM Project Leader, reported that the concerted EVM data collection phase that had begun in January was nearing completion, with the last of the 23 groups concerned having begun the data collection process and data corresponding to over 85% of the overall LHC cost-to-completion figure now incorporated in the system. The project team was working closely with the groups that had yet to submit their full data to ensure that the exercise was completed by Easter. The period leading up to the June meetings of the Council and its committees, at which the first EVM report was due to be presented, would then be devoted to tuning the data and ensuring consistent reporting across all the groups concerned. Preparation of the March Meetings of the Council and its Committees The Director-General stated that, in addition to regular items of business, such as the approval of the 2003 Budget at 2003 prices, contract adjudications and a progress report on technology tra...

  1. Presentations and documents submitted to the 26. meeting, NEA Headquarters

    International Nuclear Information System (INIS)

    2014-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is a compilation of the available Presentations (slides) and documents (reports) submitted to the 26. WPEC meeting: Summary record of the previous meeting, May 2013; Membership and observers - May 2014 (Participation, Informal discussions on criteria defining an 'evaluation project'); 25. Anniversary of WPEC and brief overview of WPEC history; Reports on experimental activities: Europe, Japan, USA, Russia (no presentation available), China; Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND (no presentation available), CENDL, IAEA, TENDL; Status of subgroups: Subgroup 27: Prompt photon production from fission products (no presentation available), Subgroup 28: Processing of covariance data, Subgroup 31: Meeting nuclear data needs for advanced reactors, Subgroup 33: Methods and issues for the combined use of integral experiments and covariance data, Subgroup 34: Coordinated evaluation of Pu-239 in the resonance region, Subgroup 35: Scattering angular distribution in the fast energy range (no presentation available), Subgroup 36: Reporting and usage of experimental data for evaluation in the resolved resonance region, Subgroup 37: Improved fission product yield evaluation methodologies, Subgroup 38: A

  2. Human Research Program 2010 Chair Standing Review Panel Meeting

    Science.gov (United States)

    Steinberg, Susan

    2011-01-01

    The 13 Human Research Program (HRP) Standing Review Panel (SRP) Chairs, and in some cases one or two additional panel members (see section XIV, roster) referred to as the Chair (+1) SRP throughout this document, met at the NASA Johnson Space Center (JSC) on December 7, 2010 to allow the HRP Elements and Projects to report on their progress over the past year, their current status, and their plans for the upcoming year based on NASA's current goals and objectives for human space exploration. A large focus of the meeting was also used to discuss integration across the HRP scientific disciplines based on a recommendation from the 2009 HRP SRP review. During the one-day meeting, each of the HRP Elements and Projects presented the changes they made to the HRP Integrated Research Plan (IRP Rev. B) over the last year, and what their top three areas of integration are between other HRP Elements/Projects. The Chair (+1) SRP spent sufficient time addressing the panel charge, either as a group or in a separate closed session, and the Chair (+1) SRP and the HRP presenters and observers, in most cases, had sufficient time to discuss during and after the presentations. The SRP made a final debriefing to the HRP Program Scientist, Dr. John B. Charles, prior to the close of the meeting on December 7, 2010. Overall, the Chair (+1) SRP concluded that most of the HRP Elements/Projects did a commendable job during the past year in addressing integration across the HRP scientific disciplines with the available resources. The Chair (+1) SRP agreed that the idea of integration between HRP Elements/Projects is noble, but believes all parties involved should have the same definition of integration, in order to be successful. The Chair (+1) SRP also believes that a key to successful integration is communication among the HRP Elements/Projects which may present a challenge. The Chair (+1) SRP recommends that the HRP have a workshop on program integration (with HRP Element/Project

  3. 76 FR 7869 - National Cancer Institute; Notice of Meeting

    Science.gov (United States)

    2011-02-11

    ... Project, Case Studies of Alternative Models to Consent for Research. Place: Hyatt Regency Bethesda, One... Liaison Group. The meeting will be open to the public, with attendance limited to space available... Carollo, MPA, Advocacy Relations Manager, Office Of Advocacy Relations, Building 31, Room 10A30, 31 Center...

  4. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  5. Nuclear based technologies for estimating microbial protein supply in ruminant livestock. Proceedings of the second research co-ordination meeting of a co-ordinated research project (phase 1)

    International Nuclear Information System (INIS)

    1999-06-01

    The Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture through its Co-ordinated Research Projects (CRPs), has been assisting national agricultural research systems in Member States to develop and apply nuclear and related techniques for improving livestock productivity. The programmes have focused on animal nutrition, animal reproduction and more recently on animal nutrition/reproduction interactions with emphasis on smallholder farming systems. The measurement of microbial protein supply to ruminant livestock has been an important area of research in ruminant nutrition. An estimate of microbial protein contribution to the intestinal protein flow is important for estimating the protein requirement of ruminant animals. Understanding the process of microbial protein synthesis has been difficult however, and due to the lack of simple and accurate methods for measuring microbial protein production in vivo, the methods used are based on complex microbial markers which require surgically prepared animals. As a result of a consultants meeting held in May 1995 to advise the Joint FAO/IAEA Division on the feasibility of using nuclear and related techniques for the development and validation of techniques for measuring microbial protein supply in ruminant animals, an FAO/IAEA Co-ordinated Research Project on Development, Standardization and Validation of Nuclear Based Technologies for Measuring Microbial Protein Supply in Ruminant Livestock for Improving Productivity was initiated in 1996, with a view to validating and adapting this technology for use in developing countries. To assist scientists participating in the CRP, a laboratory manual containing experimental protocols and methodologies for standardization and validation of the urine purine derivative technique and the development of models to suit local conditions, was published as IAEA-TECDOC-945. The present publication contains the final reports from participants in Phase 1 of the project

  6. Nuclear based technologies for estimating microbial protein supply in ruminant livestock. Proceedings of the second research co-ordination meeting of a co-ordinated research project (phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture through its Co-ordinated Research Projects (CRPs), has been assisting national agricultural research systems in Member States to develop and apply nuclear and related techniques for improving livestock productivity. The programmes have focused on animal nutrition, animal reproduction and more recently on animal nutrition/reproduction interactions with emphasis on smallholder farming systems. The measurement of microbial protein supply to ruminant livestock has been an important area of research in ruminant nutrition. An estimate of microbial protein contribution to the intestinal protein flow is important for estimating the protein requirement of ruminant animals. Understanding the process of microbial protein synthesis has been difficult however, and due to the lack of simple and accurate methods for measuring microbial protein production in vivo, the methods used are based on complex microbial markers which require surgically prepared animals. As a result of a consultants meeting held in May 1995 to advise the Joint FAO/IAEA Division on the feasibility of using nuclear and related techniques for the development and validation of techniques for measuring microbial protein supply in ruminant animals, an FAO/IAEA Co-ordinated Research Project on Development, Standardization and Validation of Nuclear Based Technologies for Measuring Microbial Protein Supply in Ruminant Livestock for Improving Productivity was initiated in 1996, with a view to validating and adapting this technology for use in developing countries. To assist scientists participating in the CRP, a laboratory manual containing experimental protocols and methodologies for standardization and validation of the urine purine derivative technique and the development of models to suit local conditions, was published as IAEA-TECDOC-945. The present publication contains the final reports from participants in Phase 1 of the project

  7. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  8. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  9. Proceedings of the second Korea-Japan meeting on neutron science

    International Nuclear Information System (INIS)

    Kamiyama, Takashi; Itoh, Shinichi

    2003-02-01

    The 2nd Korea-Japan Meeting on Neutron Science was held at KEK on 28-29th March, 2002. Forty neutron scientists from eighteen organizations (eleven Korean neutron scientists from seven organizations) participated at the meeting and shared an exciting time discussing various topics including instrumentation. The first day was devoted to the overview of the facilities in both Korea and Japan, single and powder diffraction, reflectivity and spin dynamics and magnetism. On the second day, topics on SANS and WANS, industrial application, reflectivity and instrumentation (including detectors development). Neutron facility in the high intensity proton accelerator project of Japan (J-PARC) was also introduced. This issue is the collection of the documents presented at the title meeting. (J.P.N.)

  10. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  11. Family participation in care plan meetings : Promoting a collaborative organizational culture in nursing homes

    NARCIS (Netherlands)

    Dijkstra, Ate

    In this study, the author evaluated a project in The Netherlands that aimed to promote family members' participation in care plan meetings at a psychogeriatric nursing home. The small-scale pilot project, which was conducted in four wards of the nursing home, was designed to involve families in

  12. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  13. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  14. The 1000 bull genome project

    Science.gov (United States)

    To meet growing global demands for high value protein from milk and meat, rates of genetic gain in domestic cattle must be accelerated. At the same time, animal health and welfare must be considered. The 1000 bull genomes project supports these goals by providing annotated sequence variants and ge...

  15. THE IMPORTANCE OF PROJECT MANAGEMENT IN FUNDRAISING FOR MUNICIPAL ADMINISTRATION

    Directory of Open Access Journals (Sweden)

    Ivan Coriolano Barros Durand Junior

    2014-09-01

    Full Text Available It is the constant growth of the public administration challenges in meeting the huge demand generated by the needs in education, health, housing, infrastructure and social assistance,which can rarely be met only by the usual collection of fees of the municipalities. Hence, and in order to properly document the uses of public resources, the Federal Government adopted a new instance on the release of public funds to meet the demands of the municipalities by requiring the production of projects. Thus, mechanisms have been developed in order to receive and review projects developed in municipal levels.

  16. Proceedings of Task Force Meeting "Human Factors in Innovation Management". Helsinki, 9-14 October, 1983

    OpenAIRE

    Vasko, T.; Goncharov, V.

    1984-01-01

    These proceedings from the IIASA Task Force Meeting held in Helsinki from 9-14 October, 1983 reflect the wide spectrum of interests and experiences of the participants. The main topic -- Human Factors in Innovation Management -- was singled out as a potential focus early in the life of the Innovation Management Project. Preliminary meetings had already indicated how internally structured this topic could be. Intentionally, no attempts were made to limit the scope of the meeting, as the object...

  17. Project-Based Learning in Electronic Technology: A Case Study

    Science.gov (United States)

    Li, Li

    2015-01-01

    A case study of project-based learning (PBL) implemented in Tianjin University of Technology and Education is presented. This multidiscipline project is innovated to meet the novel requirements of industry while keeping its traditional effectiveness in driving students to apply knowledge to practice and problem-solving. The implementation of PBL…

  18. International Arctic Seas Assessment Project (IASAP)

    International Nuclear Information System (INIS)

    Sjoeblom, K.L.; Linsley, G.S.

    1995-01-01

    The purpose of this paper was to give an overall view of the International Arctic Seas Assessment Project (IASAP). The IASAP project was initiated in 1993 to address concerns about the possible health and environmental impacts of radioactive wastes dumped in the shallow waters of the Arctic seas by the former Soviet Union. The project is being executed as a part of the IAEA's responsibilities under the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention 1972). The results and conclusions of the project are expected to be reported to the London Convention in late 1996. The objectives of the project are: 1) to assess the risks to human health and to the environment associated with the radioactive waste dumped in the Kara and Barents Seas; and 2) to examine possible remedial actions related to the dumped wastes and to advise on whether they are necessary and justified. The project is organized in five working areas: source terms, existing environmental concentrations, transfer mechanisms and models, impact assessment and remedial measures. Progress made in all working areas of IASAP is reviewed each year by a group of senior scientists (IASAP Advisory Group Meeting). During the first two years of the IASAP project, a considerable amount of new information has been produced and published as IASAP working documents. Experts from 15 countries and several international organizations are involved in the different Working Groups and Advisory Group Meetings of the project. It is planned that in addition to the report to the London Convention, which will be prepared by the Advisory Group, detailed technical reports covering the work of all areas of the IASAP will be produced. 12 refs., 3 figs., 1 tab

  19. Dream Team--The Case of an Undergraduate Surgical Talent Development Project

    Science.gov (United States)

    Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel

    2016-01-01

    To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…

  20. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  1. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...

  2. Learning Meetings and Conferences in Practice

    DEFF Research Database (Denmark)

    Elsborg, Steen; Ravn, Ib

    , Speaker's Cornered, Presentations as Interviews, A Lunch that Fosters Contacts, and Two Free Consultants. The book is based on results from the research and development project "The Learning Meeting." It was conducted by Learning Lab Denmark in collaboration with Danske Bank, Rezidor SAS Hospitality (the...... Radisson SAS hotels), Hotel Legoland, Best Western Nyborg Strand, and Odense Congress Center. This book is a translation of the authors' "Lærende møder og konferencer i praksis", People's Press, 2006....

  3. First IAEA research co-ordination meeting on 'Tritium inventory in fusion reactors'. Summary report

    International Nuclear Information System (INIS)

    Clark, R.E.H.

    2003-02-01

    The proceedings and conclusions of the first Research Co-ordination Meeting on 'Tritium Inventory in Fusion Reactors', held on November 4-6, 2002 at the IAEA Headquarters in Vienna are briefly described. This report includes a summary of the presentations made by the meeting participants and the specific goals set by the participants of the Co-ordinated Research Project (CRP). (author)

  4. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  5. The Groix and Belle-Ile floating wind turbines and their electrical connection. Information file, April 2017. Project of 'Groix and Belle-Ile floating wind turbines' and their electrical connection - Public meetings in Erdeven on 15 February 2017, Lorient on 14 February 2017, Le Palais in Belle-Ile on 12 April 2017, Groix on 13 April 2017, Quiberon 11 April 2017

    International Nuclear Information System (INIS)

    Daugeron, Thierry; Peyer, Germain; Lanne, Marc; Chabert, Christophe; Bordenave, Thomas; Mace, Herve; Brisset, Olivier; Chevreau, Gaelle

    2017-01-01

    A first document presents the Groix and Belle-Ile floating wind turbine project which is considered as a technological, ecological and industrial achievement (main figures and data, opportunities). It also presents how these wind turbines will be connected to the grid, outlines how this project will respect the natural and human environment, and to which extent consultation is at the heart of the project. Then, contents of several public meetings held about this project are reported. These public meetings comprised contributions of institutional and industrial actors, and also debates with the public

  6. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  7. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  8. Third research coordination meeting on reference database for neutron activation analysis. Summary report

    International Nuclear Information System (INIS)

    Kellett, M.A.

    2009-12-01

    The third meeting of the Co-ordinated Research Project on 'Reference Database for Neutron Activation Analysis' was held at the IAEA, Vienna from 17-19 November 2008. A summary of presentations made by participants is given, reports on specific tasks and subsequent discussions. With the aim of finalising the work of this CRP and in order to meet initial objectives, outputs were discussed and detailed task assignments agreed upon. (author)

  9. Midwestern High-Level Radioactive Waste Transportation Project

    International Nuclear Information System (INIS)

    1993-01-01

    On February 17,1989, the Midwestern Office of The Council of State Governments and the US Department of Energy entered into a cooperative agreement authorizing the initiation of the Midwestern High-Level Radioactive Waste Transportation Project. The transportation project continued to receive funding from DOE through amendments to the original cooperative agreement, with December 31, 1993, marking the end of the initial 5-year period. This progress report reflects the work completed by the Midwestern Office from February 17,1989, through December 31,1993. In accordance with the scopes of work governing the period covered by this report, the Midwestern Office of The Council of State Governments has worked closely with the Midwestern High-Level Radioactive Waste Committee. Project staff have facilitated all eight of the committee's meetings and have represented the committee at meetings of DOE's Transportation Coordination Group (TCG) and Transportation External Coordination Working Group (TEC/WG). Staff have also prepared and submitted comments on DOE activities on behalf of the committee. In addition to working with the committee, project staff have prepared and distributed 20 reports, including some revised reports (see Attachment 1). Staff have also developed a library of reference materials for the benefit of committee members, state officials, and other interested parties. To publicize the library, and to make it more accessible to potential users, project staff have prepared and distributed regular notices of resource availability

  10. Investments in information systems and technology in the healthcare: Project management mediation

    Directory of Open Access Journals (Sweden)

    Jorge Gomes

    2017-03-01

    Full Text Available Healthcare organisations must improve their business practices and internal procedures in order to answer the increasing demand of health professionals and the general public for more and better information. Hospitals invest massively in information systems and technology (IS/IT in the hope that these investments will improve healthcare and meet patients’ demands. The main objective of our research is to study how organisational maturity, enhanced by investments in IS/IT, project management and best practices, leads to successful projects in public healthcare organisations. The rational of our model is that organisational maturity has a positive effect on IS/IT project success, and that this success is also positively enhanced by the use of project management practices. We emphasise that this combination of approaches can increase the effectiveness of projects. Furthermore, it can also improve the confidence that the results of investments will meet stakeholders’ expectations.

  11. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  12. 78 FR 2961 - Sunshine Act Meeting-Closed Meeting

    Science.gov (United States)

    2013-01-15

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting--Closed Meeting The following notice of a closed meeting is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94- 409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME...

  13. 78 FR 6306 - Sunshine Act Meeting-Closed Meeting

    Science.gov (United States)

    2013-01-30

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting--Closed Meeting The following notice of a closed meeting is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94- 409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME...

  14. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  15. Human Genome Diversity Project. Summary of planning workshop 3(B): Ethical and human-rights implications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The third planning workshop of the Human Genome Diversity Project was held on the campus of the US National Institutes of Health in Bethesda, Maryland, from February 16 through February 18, 1993. The second day of the workshop was devoted to an exploration of the ethical and human-rights implications of the Project. This open meeting centered on three roundtables, involving 12 invited participants, and the resulting discussions among all those present. Attendees and their affiliations are listed in the attached Appendix A. The discussion was guided by a schedule and list of possible issues, distributed to all present and attached as Appendix B. This is a relatively complete, and thus lengthy, summary of the comments at the meeting. The beginning of the summary sets out as conclusions some issues on which there appeared to be widespread agreement, but those conclusions are not intended to serve as a set of detailed recommendations. The meeting organizer is distributing his recommendations in a separate memorandum; recommendations from others who attended the meeting are welcome and will be distributed by the meeting organizer to the participants and to the Project committee.

  16. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-09-14

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  17. 76 FR 37200 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-06-24

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  18. 76 FR 22170 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-04-20

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  19. 76 FR 63715 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-10-13

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  20. 76 FR 46897 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-08-03

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  1. 76 FR 6189 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-02-03

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  2. 76 FR 10942 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-02-28

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  3. Stakeholder Meetings on Black Carbon from Diesel Sources in the Russian Arctic

    Science.gov (United States)

    From January 28-February 1, 2013, EPA and its partners held meetings in Murmansk and Moscow with key Russian stakeholders to gather input into the project’s emissions inventory methodologies and potential pilot project ideas.

  4. Spectroscopic and Collisional Data for Tungsten from 1 eV to 20 keV. Summary Report of the Second Research Coordination Meeting

    International Nuclear Information System (INIS)

    Braams, Bastiaan J.

    2014-08-01

    The second Research Coordination Meeting of a coordinated research project (CRP) on spectroscopic and collisional data for tungsten ions in fusion plasma was held 29-31 August 2012 at Max-Planck- Institute for Nuclear Physics, Heidelberg, Germany. Thirteen projects participate in the CRP and were represented at the meeting together with 8 further experts and 2 IAEA scientific staff. Participants presented their research following which outstanding data needs were identified and a work plan was developed for the remainder of the CRP. The proceedings and conclusions of the meeting are summarized here. (author)

  5. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    Science.gov (United States)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  6. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  7. Managing design with the effective use of communication media : the relationship between design dialogues and design team meetings

    NARCIS (Netherlands)

    Emmitt, S.; Otter, den A.F.H.J.

    2007-01-01

    Effective and efficient design team communication is an essential component of architectural design and construction projects. Face-to-face communication, via meetings and dialogue, is an essential means for design team members to discuss and communicate design ideas. Meetings represent an important

  8. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  9. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  10. Railway projects prioritisation for investment : application of goal programming

    OpenAIRE

    Ahern, Aoife; Anandarajah, Gabrial

    2007-01-01

    This research develops a weighted integer goal-programming model for prioritising railway projects for investment. The goal of the model is to prioritise the identified projects for investment while maximising the objectives and meeting the budget limit for capital investment. The model minimises the goal deviations of the objectives. The objectives of the model include quantitative and qualitative attributes. The model is applied to prioritise the new railway projects, which have a total cos...

  11. Proceedings of national avian-wind power planning meeting 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  12. Proceedings of national avian-wind power planning meeting II

    International Nuclear Information System (INIS)

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group's recommendations for future research or associated activities. A final plenary session drew together the main recommendations

  13. Meeting Disorders.

    Science.gov (United States)

    Yager, Joel; Katzman, Jeffrey W

    2017-12-01

    Although meetings are central to organizational work, considerable time devoted to meetings in Academic Health Centers appears to be unproductively spent. The primary purposes of this article are to delineate and describe Meeting Disorders, pathological processes resulting in these inefficient and ineffective scenarios, and Meeting Fatigue Disorder (MFD), a clinical syndrome. The paper also offers preliminary approaches to remedies. The authors integrate observations made during tens of thousands of hours in administrative meetings in academic medical settings with information in the literature regarding the nature, causes and potential interventions for dysfunctional groups and meetings. Meeting Disorders, resulting from distinct pathologies of leadership and organization, constitute prevalent subgroups of the bureaucrapathologies, pathological conditions caused by dysfunctional bureaucratic processes that generate excesses of wasted time, effort, and other resources. These disorders also generate frustration and demoralization among participants, contributing to professional burnout. Meeting Fatigue Disorder (MFD) is a subjective condition that develops in individuals who overdose on these experiences and may reflect one manifestation of burnout. Meeting disorders and Meeting Fatigue Disorder occur commonly in bureaucratic life. Resources and potential remedies are available to help ameliorate their more deleterious effects.

  14. Minutes of the WG.2 meeting, 18 October 1978

    International Nuclear Information System (INIS)

    1978-10-01

    The meeting of WG.2B on 18 October 1978 and the meeting of WG.2 on 18-19 October 1978 are summarized. Both meetings gave attention to the projection of enrichment capacities through the year 2000 and to the content of the final report. An appendix presents French views on the proliferation risks of uranium enrichment. Obtaining highly enriched uranium involves the availability of natural uranium and the mastership of an appropriate enrichment technique. Natural uranium is relatively easily available, so proliferation resistance must be found in the enrichment technique. Some difficulties noted are: Bringing the technique to the level of possible utilization, manufacturing enrichment plant components, starting up, operating, concealing a clandestine plant, and converting an existing LEU plant into a HEU plant by re-arrangement or by batch recycling. A qualitative assessment of the major technologies in terms of these criteria is given

  15. 29 CFR 2701.2 - Open meetings policy; closure of meetings.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Open meetings policy; closure of meetings. 2701.2 Section... GOVERNMENT IN THE SUNSHINE ACT REGULATIONS § 2701.2 Open meetings policy; closure of meetings. (a) Policy. Commission meetings will generally be open to public observation, including meetings concerning the...

  16. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-03-31

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Section 10(a)(2) of the Federal Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the...

  17. Proceedings of the Fifth Users Meeting for the Advanced Photon Source

    International Nuclear Information System (INIS)

    1992-12-01

    The Fifth Users Meeting for the Advanced Photon Source (APS) was held on October 14--15, 1992, at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, funding opportunities, advances in synchrotron radiation applications, and technical developments at the APS. In addition, the 15 Collaborative Access Teams that have been approved to date participated in a poster session, and several vendors displayed their wares. The actions taken at the 1992 Business Meeting of the Advanced Photon Source Users Organization are also documented

  18. Meeting electrification's social objectives in South Africa, and implications for developing countries

    International Nuclear Information System (INIS)

    Gaunt, C.T.

    2005-01-01

    Electrification programmes and projects are usually planned and evaluated on the basis of their economic (financial) and socio-economic performance. It is not usually recognised that electrification is often carried out for social objectives of poverty alleviation and political effect. Examination of electrification in South Africa reveals clearly that initial electrification was to meet economic objectives, later socio-economic objectives were adopted, and recently the objectives were social. Social electrification, particularly rural electrification, is not viable according to usual assessment methods, which are frequently distorted to provide the justification for a project to proceed. The technology of network electrification changed to meet the constraints, challenging usual perceptions about the relative costs of urban and rural electrification and the potential for photovoltaic electrification. Adopting a specification for social electrification allows suitable tariffs for electrification to be identified, indicates how capital investment decisions might be modified for social electrification, and identifies implications for electricity industry restructuring. A better understanding of electrification's social objectives has implications for projects and programmes in other developing countries

  19. Improving Software Engineering on NASA Projects

    Science.gov (United States)

    Crumbley, Tim; Kelly, John C.

    2010-01-01

    Software Engineering Initiative: Reduces risk of software failure -Increases mission safety. More predictable software cost estimates and delivery schedules. Smarter buyer of contracted out software. More defects found and removed earlier. Reduces duplication of efforts between projects. Increases ability to meet the challenges of evolving software technology.

  20. 31 CFR 515.575 - Humanitarian projects.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Humanitarian projects. 515.575 Section 515.575 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE... meet basic human needs. Specific licenses may be issued authorizing transactions for multiple visits...

  1. Project LOCAL - Bridging The Gap

    Science.gov (United States)

    Haven, Robert N.

    1975-01-01

    Project LOCAL, a not-for-profit regional consortium, offers a broad spectrum of in-service training courses tailored to meet the needs of educators in various disciplines and levels of experience. The purpose of these offerings is to bridge the communication gap between innovative centers in computer-oriented education and staff members in Boston…

  2. Project VUE: Volunteers Upholding Education.

    Science.gov (United States)

    Thurber, John C.

    This document reports on a project aimed at developing, implementing, and evaluating a plan for using volunteer classroom aides in the Palm Beach County (Florida) schools as a means for meeting various financial, human, and community needs. The desirability of a comprehensive volunteer plan was presented in a 10-point summary by an ad hoc…

  3. Photovoltaic demonstration projects 2

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J [Halcrow (William) and Partners, Swindon (UK); Kaut, W [eds.

    1989-01-01

    This book, the proceedings of the third Photovoltaic Contractors' Meeting organised by the Commission of the European Communities, Directorate-General for Energy provides an overview of the photovoltaic demonstration projects which have been supported by the Energy Directorate of the Commission of the European Communities since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984 and 1985, describing progress with their projects. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of houses, villages, recreation centres, water desalination, communications, dairy farms, water pumping and warning systems. (author).

  4. Urban Agriculture in Thessaloniki. An academic project meets reality

    Directory of Open Access Journals (Sweden)

    Eleftheria Gavrilidou

    2015-12-01

    Full Text Available Nearly all projects with Urban Agriculture (UA impact in Western Europe, in the USA, and in the Developing World are started and thought by single initiatives. In so-called “bottom-up” processes of small scale, they gain energy and power by a fast and none formalized implementation. A master studio project at the Aristotle University of Thessaloniki, “Red and Green”, presents in contrast a proposal for a huge inner city area with focus on UA as generator for a socio-economic transformation towards a green economy based on social community spirit, considering in particular the crisis situation in Greece. The approach which combines the idea of integrating both top-down and bottom-up forces, attempts an integration of permanent and temporarily elements, and by this, the master plan searches qualities as an innovative planning tool. After a phase of intensive dissemination and evaluation on international level with encouraging attentiveness and recognition, a strategy for a realization in steps was created by KIPOS3, a start-up initiative organized by a group of master students to bring in the city of Thessaloniki the concept a common garden manageable by the residents under also the Municipality stewardship. A widespread network of small fallow islands in the city of Thessaloniki was detected and in a process of “mapping the city” several lots were analyzed referring for good chances of implementation. The description of the long way of discussions with landowners, the municipality and potentially users, the difficulties and obstacles, documents once more the initiators strong will and immense energy, which is necessary for a successful start-up. With financial support of a Greek Fellowship a first garden was created in 2015. The history of KIPOS3 garden in Thessaloniki consists finally a useful lesson on the role of “foodscape” on the reactivation of inactive institutions and communities, a lesson of resilience in a city of deep

  5. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  6. Delivery improvements for CANDU projects

    International Nuclear Information System (INIS)

    Stephen Yu; Ken Hedges

    1998-01-01

    Future CANDU design will continue to meet emerging design and performance requirements as expected by the operating utilities, and will integrate new technologies into both the product features and work processes. Elements of this risk reduction strategy include feedback of lessons learned from operating plants, project experiences from previous projects, and replication of successful systems and equipment. Project implementation risk is minimized by up-front engineering and licensing prior to contract start. Enhanced competitiveness of the CANDU products is ensured by incorporating improvements based on updated technology. This paper summarizes the strategy used to enhance competitiveness of the CANDU products and the measures introduced to minimize risk during project implementation. This strategy provides a balance between innovation and proven designs; and between the desire for safety and operational improvements and the cost to achieve the improvements

  7. Programme Directors' meeting of July 28-29, 1999

    International Nuclear Information System (INIS)

    Canobbio, E.

    1999-01-01

    Dr. Finzi reported in this meeting that, with the approval of the fifth Framework Programme of the EU, continued ITER activities and further operation of the JET facility are secured. Representatives from Japan and from the Russian Federation expressed the support of their governments for the reduced ITER model. The decision of the US party to withdraw from the ITER project was noted with regret

  8. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  9. Data for Erosion and Tritium Retention in Beryllium Plasma-Facing Materials. Summary Report of the First Research Coordination Meeting

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-04-01

    Nine experts in the field of plasma-wall interaction on beryllium surfaces together with IAEA staff met at IAEA Headquarters 26-28 September 2012 for the First Research Coordination Meeting of an IAEA Coordinated Research Project on data for erosion and tritium retention in beryllium plasma-facing materials. They described their on-going research, reviewed the main data needs and made plans for coordinated research during the remaining years of the project. The proceedings of the meeting are summarized in this report. (author)

  10. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  11. Meeting your financial pro forma in a competitive environment

    International Nuclear Information System (INIS)

    Klausner, C.J.; Pintcke, T.P.; Qadri, S.S.

    1996-01-01

    At times it may seem that the odds are stacked against today's independent power producer when seeking to bid and secure projects, and then having to meet financial obligations within the pro forma. However, many of the problems experienced at independent power plants in the US can be largely mitigated during the engineering and construction phases of the project. Once a plant is constructed, poor technology selection, design, and construction are difficult to correct. Good initial planning and design will optimize plant availability and performance, minimize construction schedule and cost, and control operating expenses over long-term operation

  12. Fourth and final research co-ordination meeting for the coordinated research project on 'Comparative international studies of osteoporosis using isotopic techniques'. Summary report

    International Nuclear Information System (INIS)

    Iyengar, G.V.; Mokhtar, N.

    2002-01-01

    In 1994, the International Atomic Energy Agency started the five-year Co-ordinated Research Project (CRP) on Comparative International Studies of Osteoporosis Using Isotope Techniques. The objectives of this study were: To harmonize the techniques of measuring BMD within the participating countries and to obtain data that can be compared between the different study groups (countries); To determine whether early adult PBM varies between populations over the age range from 15 to 50 years. In other words, to determine the age of peak bone mass in selected populations from developing countries; To explore environmental and nutritional contributions to any determined differences. Further information about the purpose and scope of the CRP may be found in the report of the Advisory Group Meeting (AGM) held in 19921 and other reports of this CRP. Since the last RCM held in 1998, the CRP participants have gathered up more data on BMD. Indeed 3488 subjects 15-50 years) have been recruited for the purpose of this project and have been stratified equally by sex and age into six -year age bands. Most of the participants have also completed collecting data on dietary intake, medical history, physical exercise, and lifestyle, as suggested in the VrHO questionnaire. Some participants have analyzed trace elements in a number of bone samples as well. One of the most important purposes of this CRP is to obtain harmonized data on BMD that is comparable from one study group to another. To ensure this quality insurance, the densitometers in each center were cross calibrated using a European Spine Phantom (ESP). Further-more, day-to-day control of DEXA machines was managed by each individual center. The fourth Research Co-ordination Meeting (RCM) for participants of the CRP, which is the subject of the present report, was held at the University of Sheffield Medical School; WHO Collaborating Center for Metabolic Bone Diseases in Sheffield, UK from 28 Feb. to 3 March 2000

  13. 76 FR 46897 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-08-03

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  14. 76 FR 6190 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-02-03

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  15. 76 FR 37893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-06-28

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  16. 76 FR 10942 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-02-28

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  17. Impacto dos modelos de referência e maturidade no gerenciamento de projetos: estudo exploratório em projetos de tecnologia da informação Impact of project management reference and project management maturity models on performance: an exploratory study in information technology projects

    Directory of Open Access Journals (Sweden)

    Fernando Tobal Berssaneti

    2012-08-01

    Full Text Available Modelos de maturidade e modelos de referência em gerenciamento de projetos têm sido implantados de forma crescente na área de tecnologia da informação (TI. Este artigo tem por objetivo analisar o impacto do grau de maturidade organizacional em gerenciamento de projetos e o da adoção de modelos de referência no sucesso de projetos de TI. Foi adotada a abordagem de pesquisa quantitativa, com levantamento junto a 51 profissionais da área. Os resultados apontam para correlação positiva entre o grau de maturidade organizacional em gerenciamento de projetos e a satisfação das demandas dos stakeholders (principais interessados no projeto. Também foi constatada relação estatística positiva entre a adoção do PMBoK e o sucesso de projetos de TI, no que concerne ao atendimento dos requisitos e satisfação das demandas dos stakeholders.Project management maturity and project management reference models have been widely adopted on information technology (IT companies. This article aims to analyze the impact of project management maturity level and adopt reference models on IT projects performance (success. A quantitative research approach was used, including a survey with 51 professionals from the sector. Results showed positive impact between project management maturity level and meeting of stakeholders' demands. A positive statistical correlation was also found in firms that develop information technology projects through PMBoK adoption concerning meeting requirements and meeting of stakeholders' demands.

  18. Interagency Advanced Power Group (IAPG) meeting compendium. October 1991--December 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Under the direction of the Interagency Advanced Power Group (IAPG), the Power Information Center (PIC) provides support services for each IAPG information exchange session. IAPG members meet a minimum of once each year to share programmatic and technical information on federally funded research and development (R&D) projects in the area of advanced power. This R&D is directed by one of the five IAPG member agencies-the US Army, US Navy, US Air Force, US Department of Energy, and the National Aeronautics and Space Administration. Affiliated Federal groups and federally funded research and development centers can also participate. To enhance the exchange of information between Government researchers, this 1992 IAPG Meeting Compendium has been assembled. This publication is a re-printing of abstracts of each IAPG presentation offered during 1991-1992. The information is arranged chronologically by IAPG meeting. During the 1992 IAPG meeting year, there were presentations restricted to Government audiences only. These ``Restricted`` minutes have not been included in this compilation.

  19. Minnesota STAR Project: Meeting the Needs of Struggling Adult Readers

    Science.gov (United States)

    Johnson, Kimberly A.; Frank, Margaret M.

    2012-01-01

    This paper reports on findings and implications from a two-year evaluation of the Minnesota STudent Achievement in Reading (STAR) Project. This long-term, job-embedded, professional development activity is provided for Minnesota Adult Basic Education (ABE) practitioners serving intermediate-level adult students reading between 4.0 to 8.9 grade…

  20. Summary Record of the Twenty-Sixth Meeting of the Working Party on International Nuclear Data Evaluation Co-operation

    International Nuclear Information System (INIS)

    Dupont, Emmeric

    2014-01-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is the executive summary of WPEC's 26. meeting held in 2014. It presents a brief review of the 2 days meeting in particular the Reports on experimental activities in Europe, Japan, USA and China, the Brief progress reports from the evaluation projects (ENDF, JEFF, JENDL, ROSFOND, CENDL, IAEA, TENDL) with the discussion of future plans, the Review of final or near-final subgroup reports, the Status of ongoing subgroups, the Proposals for new subgroups and some information about Conferences and meetings of interest to the nuclear data community. A list of participants and a list of reports presented at this meeting are attached in appendix

  1. Summary report of consultants meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Plompen, A.; Mengoni, A.

    2007-10-01

    A Consultants Meeting on reaction cross section data for minor actinides was held at the IAEA Headquarters, in Vienna on 23 and 24 November, 2007. The main objective of the initiative was to define the detailed plan for the Co-ordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD) CRP. The details of the discussions which took place at the reported meeting include a review of the current activities in the field, a list of recommendations and a proposed timescale for the CRP. (author)

  2. Incorporating Gaming in Software Engineering Projects: Case of RMU Monopoly

    Directory of Open Access Journals (Sweden)

    Sushil Acharya

    2009-02-01

    Full Text Available A major challenge in engineering education is retaining student interest in the engineering discipline. Active student involvement in engineering projects is one way of retaining student interest. Such involvement can only be realized if project inception comes entirely from the student. This paper presents a software game, RMU Monopoly, developed as a project requirement for a software engineering course and describes the challenges and gains of implementing such a project. The RMU Monopoly was proposed by three junior software engineering students. The game is a multi-platform software program that allows up to eight players and implements the rules of the Monopoly board game. To ensure agility the game was developed using the spiral software development model. The Software Requirements Specification (SRS document was finalized through an iterative procedure. Standard Unified Modeling Language (UML diagrams were used for product design. A Risk Mitigation, Monitoring, and Management Plan (RMMM was developed to ensure proactive risk management. Gantt chart, weekly progress meetings and weekly scrum meetings were used to track project progress. C# and Sub- Version were used in a client-server architecture to develop the software. The project was successful in retaining student interest in the software engineering discipline

  3. 76 FR 70709 - Sunshine Act Meeting; Emergency Meeting Notice

    Science.gov (United States)

    2011-11-15

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting; Emergency Meeting Notice This notice that an emergency meeting was held is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94-409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading...

  4. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  5. XML Schema for Atoms, Molecules and Solids (XSAMS). Summary Report of an IAEA Consultants’ Meeting. Proceedings of a conference

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-12-01

    A Consultants’ Meeting on “XML Schema for Atoms, Molecules and Solids (XSAMS)” was held in conjunction with the Virtual Atomic and Molecular Data Centre (VAMDC) Cycle Three Project Meeting on the Campus of the University of Vienna on 20-22 February 2012. The meeting was to agree on the adoption of an international standard XSAMS version 1.0 and to discuss implementation activities and user experience with the schema. The proceedings of the meeting are summarized here. (author)

  6. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  7. Managing trade-offs in landscape restoration and revegetation projects.

    Science.gov (United States)

    Maron, Martine; Cockfield, Geoff

    2008-12-01

    Landscape restoration projects often have multiple and disparate conservation, resource enhancement, and sometimes economic objectives, since projects that seek to meet more than one objective tend to be viewed more positively by funding agencies and the community. The degree to which there are trade-offs among desired objectives is an important variable for decision makers, yet this is rarely explicitly considered. In particular, the existence of ecological thresholds has important implications for decision-making at both the project level and the regional level. We develop a model of the possibilities and choices for an agency seeking to achieve two environmental objectives in a region through revegetation of a number of sites. A graphical model of the production possibilities sets for a single revegetation project is developed, and different trade-off relationships are discussed and illustrated. Then the model is used to demonstrate the possibilities for managing all such projects within a region. We show that, where there are thresholds in the trade-off relationship between two objectives, specialization (single- or dominant-objective projects) should be considered. This is illustrated using a case study in which revegetation is used to meet avian biodiversity and salinity mitigation objectives. We conclude that where there are sufficient scientific data, explicit consideration of different types of trade-offs can assist in making decisions about the most efficient mix and type of projects to better achieve a range of objectives within a region.

  8. Cooperative Learning in Graduate Student Projects: Comparing Synchronous versus Asynchronous Collaboration

    Science.gov (United States)

    Strang, Kenneth

    2013-01-01

    Cooperative learning was applied in a graduate project management course to compare the effectiveness of asynchronous versus synchronous online team meetings. An experiment was constructed to allocate students to project teams while ensuring there was a balance of requisite skills, namely systems analysis and design along with HTML/Javascript…

  9. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  10. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  11. 76 FR 15964 - Funding Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Science.gov (United States)

    2011-03-22

    ... of any further ways we could reduce potential costs or increase potential benefits while preserving... would also provide logistical and financial support for annual meetings of the Project Directors of the...) Organizing and providing logistical and financial support for annual meetings of the ADA Regional Centers...

  12. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  13. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  14. 78 FR 5413 - Agenda and Notice of Public Meetings of the Massachusetts Advisory Committee

    Science.gov (United States)

    2013-01-25

    .... The purpose of the meetings are orientation and project planning. Members of the public are entitled... needing accessibility services should contact the Eastern Regional Office at least 10 working days before...

  15. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...... cooperation, mediated by interconnected and diversified systems, is becoming more and more common. These relatively new forms of interaction imply new demands on skills and methods facilitating project cooperation within and among various organizations. Given the pervasiveness of these demands, project...... managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...

  16. International meeting 'Selected topics on nuclear methods for non-nuclear applications'. Proceedings

    International Nuclear Information System (INIS)

    Stoyanov, Ch.

    2007-01-01

    The volume includes the presentations given on the International Meeting 'Selected Topics on Nuclear Methods for Non-nuclear Applications'. The meeting was organized by the Project CECOA. The Project 'CEnter for COoerative Activities' (CECOA) of the Institute for Nuclear Research and Nuclear Energy (INRNE) of Bulgarian Academy of Sciences is part of the Program 'Creating of Infrastructure' of Bulgarian Ministry of Science and Education. The CECOA-project unifies the groups of INRNE doing research in the field of nuclear methods. Four Laboratories of INRNE are members of CECOA-project: Moessbauer Spectroscopy and Low Radioactivity Measurements, High-Resolution Gamma-Spectroscopy, Neutron Methods in Condensed Matter, Neutron Optics and Structure Analysis. Taking into account the leading role of education on nuclear physics the Project includes program devoted to the training on nuclear physics. The presented volume contains 23 contributed papers. The contributions are separated in 6 sections. The section 'Nano technology' includes 5 papers. The activity in this field within the Project reveals the collaboration with other Institutes of Bulgarian Academy of Sciences as well as large international contacts. The section 'Radioecology and Radioactive Waste' is two fold. Part of the contributions of the section manifests the connection of the CECOA with small enterprises. The contacts are on the level of common projects concerning the investigations, remediation and release of radioactively contaminated terrain, soils, water, buildings and materials around the former uranium processing industry. Another part of the section is devoted to the application of nuclear methods to the treatment of radioactive waste produced by nuclear power stations. The section 'Neutron Physics' reveals the activity within the Project connected with the study of new materials using polarized neutrons and neutron diffraction methods. The section 'Nuclear Physics' is an introduction to some

  17. My Most Memorable AAS Meeting-December 1957, Butler University, Indianapolis, Indiana

    Science.gov (United States)

    Edmondson, F. K.

    1999-05-01

    My attendance at AAS meetings began with the 46th meeting in September 1931 at the brand new Perkins Observatory. This was the first semester of my junior year at Indiana University. Professor Wilbur Cogshall, my astronomy professor, took me to the meeting, and paid my expenses for dormitory accommodations and meals. Hence, my attendance at AAS meetings covers a span of nearly 68 years. There have been so many "memorable" meetings that it is hard to pick just one. However, the 99th meeting in December 1957 at Butler University in Indianapolis, a joint meeting with the AAAS, is memorable because I was in a wheel chair and using crutches, following an injury to my right knee cap. I was a member of the AAAS Committee to select the "best paper" presented at the meeting to receive the Newcomb Cleveland Prize, and Martin Schwarzschild's first report of results from Project Stratoscope was on the program. I showed up at the Committee meeting in my wheel chair, and nominated Martin's paper for the "best paper" award. The Committee asked a lot of questions and then approved the paper by a unanimous vote. The wheel chair and crutches obviously played a role in convincing the Committee that I had strong feelings about the merits of Martin's paper. Allan Sandage was the Warner Prize Lecturer, and reported on the current status of his revision of the cosmic distance scale. Hubble's 1936 distances needed to be increased by a factor of five to ten.

  18. Proceedings of the nuclear criticality technology safety project

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, R.G. [comp.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings.

  19. Proceedings of the nuclear criticality technology safety project

    International Nuclear Information System (INIS)

    Sanchez, R.G.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings

  20. 75 FR 39492 - Major Capital Investment Projects

    Science.gov (United States)

    2010-07-09

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the date, time, and location of an...

  1. 75 FR 33757 - Major Capital Investment Projects

    Science.gov (United States)

    2010-06-15

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the dates, times, and locations of...

  2. 77 FR 27451 - Boott Hydropower, Inc.; Notice of Section 106 Consultation Meeting

    Science.gov (United States)

    2012-05-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower, Inc.; Notice of Section 106 Consultation Meeting On May 24, 2012, Federal Energy Regulatory Commission... Historic Preservation, Boott Hydropower, Inc., and any other consulting parties for the section 106 process...

  3. 78 FR 66354 - Warm Springs Irrigation District; Notice of Technical Meeting

    Science.gov (United States)

    2013-11-05

    ... Stanleya confertiflora requested by the U.S. Bureau of Land Management on June 7, 2013; the coordination of... project. f. Proposed Agenda: 1. Introduction 2. Meeting objectives 3. Plant survey discussion 4. NEPA... business Thursday, November 7, 2013, to RSVP to receive specific instructions on how to participate. Dated...

  4. 77 FR 59593 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meetings

    Science.gov (United States)

    2012-09-28

    ... Strategic Planning Working Group will meet. 5 p.m. until 6 p.m.--There will be a Public Listening Session... a presentation regarding the Management Strategy Evaluation (MSA) Summer Flounder Study. 10 a.m... the Visioning Project, and discuss objectives, strategies, and tactics for three to four strategic...

  5. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  6. 76 FR 17996 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-03-31

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted. The... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  7. IAEA technical meeting on nuclear data library for advanced systems - Fusion devices

    International Nuclear Information System (INIS)

    Forrest, R.; Mengoni, A.

    2008-04-01

    A Technical Meeting on 'Nuclear Data Library for Advanced Systems - Fusion Devices' was held at the IAEA Headquarters in Vienna from 31 October to 2 November 2007. The main objective of the initiative has been to define a proposal and detailed plan of activities for a Co-ordinated Research Project on this subject. Details of the discussions which took place at the meeting, including a review of the current activities in the field, a list of recommendations and a proposed timeline schedule for the CRP are summarized in this report. (author)

  8. Nuclear data project evaluation activity report. October 1998 - October 2000

    Energy Technology Data Exchange (ETDEWEB)

    Akovali, Y; Blackmon, J; Radford, D; Smith, M [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN (United States)

    2001-02-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report.

  9. Nuclear data project evaluation activity report. October 1998 - October 2000

    International Nuclear Information System (INIS)

    Akovali, Y.; Blackmon, J.; Radford, D.; Smith, M.

    2001-01-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report

  10. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  11. A follow-up meeting post death is appreciated by family members of deceased patients.

    Science.gov (United States)

    Kock, M; Berntsson, C; Bengtsson, A

    2014-08-01

    A practice with a follow-up meeting post death (FUMPD) with physician and staff for family members of patients who died in the intensive care unit (ICU) was started as a quality project to improve the support of families in post-ICU bereavement. A quality improvement control was conducted after 4 years. The quality improvement control was made retrospectively as an anonymous non-coded questionnaire. Part A related to the FUMPD. Part B inquired if we could contact the family member again for a research project to evaluate family support post-ICU bereavement. The questionnaires were sent to 84 family members of 56 deceased patients. Part A: 46 out of 84 family members answered and had attended a FUMPD. Ninety-one percent of the family members thought that we should continue to offer FUMPD. Seventy-eight percent were satisfied with their meeting. Eighty percent felt that they understood the cause of death. The majority wanted the meeting to take place within 6 weeks of death. Ninety-one percent rated the physician as important to be present at the meeting. The social worker was rated more important to attend the meeting than the assistant nurse. Ninety-one percent wanted to discuss the cause of death.Part B: 54 out of 84 family members answered. Twenty out of 54 did not want us to contact them again. A routine with a Follow-Up Meeting Post Death with the ICU team for the families of the patients who die in the ICU is appreciated. The presence of the physician is important. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  12. Proceedings of the twenty-fourth water reactor safety information meeting. Volume 2: Reactor pressure vessel embrittlement and thermal annealing; Reactor vessel lower head integrity; Evaluation and projection of steam generator tube condition and integrity

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1997-02-01

    This three-volume report contains papers presented at the Twenty-Fourth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 21--23, 1996. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from Czech Republic, Finland, France, Japan, Norway, Russia and United Kingdom. This volume is divided into the following sections: reactor pressure vessel embrittlement and thermal annealing; reactor vessel lower head integrity; and evaluation and projection of steam generator tube condition and integrity. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  13. Proceedings of the twenty-fourth water reactor safety information meeting. Volume 2: Reactor pressure vessel embrittlement and thermal annealing; Reactor vessel lower head integrity; Evaluation and projection of steam generator tube condition and integrity

    International Nuclear Information System (INIS)

    Monteleone, S.

    1997-02-01

    This three-volume report contains papers presented at the Twenty-Fourth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 21--23, 1996. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from Czech Republic, Finland, France, Japan, Norway, Russia and United Kingdom. This volume is divided into the following sections: reactor pressure vessel embrittlement and thermal annealing; reactor vessel lower head integrity; and evaluation and projection of steam generator tube condition and integrity. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database

  14. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  15. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  16. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  17. A study on strategies for effective participation in the IAEA/RCA projects

    International Nuclear Information System (INIS)

    Chung, Joon Keuk; Jun, Byung Jin; Lee, Man Ki; Jin, Joon Ha; Choi, Pyung Hoon; Kim, Myung Ro; Min, Do Young

    2002-07-01

    In an effort to achieve the objectives, the following provisions were made. First of all, how this project supported RCA events that were held in Korea during the project period was described. Also, participation in RCA major policy level meetings, RCA-30 Scientific Forum, RCA Regional Office Opening were briefly reviewed. Secondly, RCA's general features including history and objective of its establishment, basic policy, administrative structure, major meetings was also reviewed. Thirdly, Overview of RCA projects, project implementation mechanism, on-going and planned project, review of technology utilization so fat and success stories were described. Fourthly, the issues related to the effective RCA management such as lead countries, Regional Resources Units (RRUs), RCA future vision and outsourcing of technical cooperation projects were reviewed. Finally, proper strategies and recommendations for active implementation of RCA projects were presented. This study can be utilized as basic reference material in the efficient implementation of RCA programmes in the future and for the personnel involved in the RCA projects as the fundamental elements for implementing the RCA cooperation are presented. The effective implementation direction for RCA programmes and strategies for strengthening Korea's participation in RCA projects can be utilized as basic reference material for the effective planning and implementation of RCA projects. It is hoped that this study will be widely utilized for expanding Korea's participation in the RCA project and for establishing a future direction for RCA projects by the governments, industries, academic circles and research institutions

  18. Educating Engaged Citizens: Four Projects from Ireland

    Science.gov (United States)

    O'Flaherty, Joanne; Liddy, Mags; Tansey, Lorraine; Roche, Cathy

    2011-01-01

    Purpose: This paper aims to describe the four education projects that demonstrate how Irish education provision is adapting to meet social and economic changes: Ubuntu Network working to integrate education for sustainable development (ESD) into teacher education; Community Knowledge Initiative (CKI) facilitating service learning modules at higher…

  19. The right stuff ... meeting your customer needs.

    Science.gov (United States)

    Rubin, P; Carrington, S

    1999-11-01

    Meeting (and exceeding) your customers' needs is a requirement for competing in the current business world. New tools and techniques must be employed to deal with the rapidly changing global environment. This article describes the success of a global supply chain integration project for a division of a large multinational corporation. A state-of-the-art ERP software package was implemented in conjunction with major process changes to improve the organization's ability to promise and deliver product to their customers.

  20. IAEA advisory group meeting on completion of FENDL-1 and start of FENDL-2. Summary report

    International Nuclear Information System (INIS)

    Pashchenko, A.B.

    1996-03-01

    The present report contains the summary of the IAEA Advisory Group Meeting on ''Completion of FENDL-1 and Start of FENDL-2'', held in Del Mar, California, USA, from 5 to 9 December 1995. The meeting was organized by the IAEA Nuclear Data Section with the cooperation and assistance of local organizers from TSI Research and the ITER Joint Central Team at San Diego. The FENDL library is a comprehensive collection of high-quality nuclear data, selected from the various existing national data libraries, covering the necessary nuclear input data for all physics and engineering aspects of the material development, design, operation and safety of the International Thermonuclear Experimental Reactor (ITER) project in its current Engineering Design Activities (EDA) phase and other fusion-related development projects. Summarized are results of the comprehensive integral data tests of FENDL-1 working libraries against available benchmark experiments performed in the framework of an international coordinated effort. Included are meeting conclusions and recommendations adopted for selection of evaluations for FENDL-2 together with a list of actions and time schedule. Attached are a detailed meeting agenda and a list of attendees. (author). Tabs

  1. HCTISN, plenary meeting of the 20 of June 2013

    International Nuclear Information System (INIS)

    2013-01-01

    This document gathers Power Point presentations which have been proposed during the meeting of the High committee for transparency and information on nuclear safety (HCTISN). A first PP, proposed by the ASN, presents the ASN's plan to implement the principle of public participation to the elaboration of its regulatory or individual decisions related to the environment. The second one, proposed by the ANDRA, presents the FAVL (low activity long life) waste storage project, notably for wastes containing radium, graphite or bitumen (waste classification, context, waste origin, temporary storage, long term management, project of small depth storage, site search process, project orientations). The third one, made by the ASN, discusses the opinion of the ASN on documents produced by the ANDRA since 2009 about the project of radioactive waste storage in deep geological layers (context, creation authorization procedure, general considerations, waste inventory, seismic data acquisition, direct storage of spent fuels coming from power reactors)

  2. NCAP projection displays: key issues for commercialization

    Science.gov (United States)

    Tomita, Akira; Jones, Philip J.

    1992-06-01

    Recently there has been much interest in a new polymer nematic dispersion technology, often called as NCAP, PDLC, PNLC, LCPC, etc., since projection displays using this technology have been shown to produce much brighter display images than projectors using conventional twisted nematic (TN) lightvalves. For commercializing projection displays based on this polymer nematic dispersion technology, the new materials must not only meet various electro- optic requirements, e.g., operational voltage, `off-state'' scattering angle, voltage holding ratio and hysteresis, but must also be stable over the lifetime of the product. This paper reports recent progress in the development of NCAP based projection displays and discusses some of the key commercialization issues.

  3. NEWS: AAPT Summer Meeting

    Science.gov (United States)

    Mellema, Steve

    2000-11-01

    session concluded with the talk by this year's award winner for Excellence in Introductory College teaching, Dr Dwight Neuenschwander from Southern Nazarene University in Oklahoma. Dwight's talk, invoking both Charles Dickens' A Christmas Carol and Robert Pirsig's Zen and the Art of Motorcycle Maintenance, was memorable for clarifying both the connections and the differences between physics and physics teaching. At a second ceremonial session on Tuesday, Terrence Walker of The Ohio State University gave the Klopsteg Memorial Lecture, entitled The Big Bang: Seeing Back to the Beginning. This was followed by the presentation of the Robert A Millikan Award Lecture - Beauty in Physics and the Arts, by Thomas Rossing of Northern Illinois University. Over the years Tom has made many contributions to the teaching of the physics of sound and music, and his lecture made wonderful connections between physics and the arts. At the first plenary session on Monday, Dr Elaine Seymour, a sociologist from the University of Colorado, gave a talk entitled: We Know Science Majors Are Lost Because of Poor Teaching, But Why Do They Resist Our Efforts To Improve Their Learning Experience? She described students' responses and resistance to the implementation of active-learning methods. The talk was thought-provoking, particularly when so many other talks at this meeting described new attempts to incorporate such methods in different educational settings. At the second plenary session on Wednesday, Eric Poisson from the University of Guelph gave a very interesting talk about Gravitational Wave Astronomy and the LIGO and VIRGO projects, including their theoretical motivation and expected experimental results. On Tuesday evening there was a very special show of physics demonstrations by the `Third Eye' group from China. Their presentations embody a very interesting philosophy. Each demonstration is designed to illustrate one or more basic concepts in physics in a way that will be both memorable

  4. Mission Status for Earth Science Constellation MOWG Meeting at KSC: EOS Aura

    Science.gov (United States)

    Fisher, Dominic

    2017-01-01

    This will be presented at the Earth Science Constellation Mission Operations Working Group (MOWG) meeting at KSC (Kennedy Space Center) in December 2017 to discus EOS (Earth Observing System) Aura status. Reviewed and approved by Eric Moyer, ESMO (Earth Sciences Mission Operations) Deputy Project Manager.

  5. Management Board Meeting of 27th June 2003

    CERN Document Server

    2003-01-01

    Status Report on Earned Value Management (EVM) J. Ferguson, the EVM Project Leader, announced that EVM progress reporting was now well in hand and entering a routine phase of operation. Some 2400 requests for details of the current status of activities had been issued to the holders of the 1750 active LHC work units, and reports had now been received for over 80% of those concerned. The EVM Project team was working closely with the divisional coordinators to improve the quality of data and, for the outstanding 20%, to understand why reports had not been submitted and to resolve any problems. The team would also be meeting the divisional coordinators the following week to set the priorities for the next stages of the EVM Project, which would subsequently be reviewed with the LHC Project Leader, L. Evans. The first EVM-based status report was due to be presented to the Finance Committee in September 2003, followed by a report to the LHC Cost and Schedule Review Committee. Concerning the integration of data on t...

  6. Summary report of the second research co-ordination meeting on measurement, calculation and evaluation of photon production data

    International Nuclear Information System (INIS)

    Oblozinsky, P.

    1996-12-01

    The present report contains the summary of the Second Research Co-ordination Meeting on ''Measurement, Calculation and Evaluation of Photon Production Data'', held in Vienna, Austria, from 21 to 24 May 1996. Summarized are conclusions and recommendations of the meeting together with a detailed list of actions and deadlines, including procedures to prepare the final document of the project. Attached is the agenda of the meeting, list of participants and extended abstracts of their presentations. (author). Refs, figs, tabs

  7. Improving Supervision for Students at a Distance: Videoconferencing for Group Meetings

    Science.gov (United States)

    Könings, Karen D.; Popa, Daniela; Gerken, Maike; Giesbers, Bas; Rienties, Bart C.; van der Vleuten, Cees P. M.; van Merriënboer, Jeroen J. G.

    2016-01-01

    Every year, thousands of students go abroad for part of their study programme. Supervision from the home institution is then crucial for good study progress. Providing supervision and feedback at a distance is challenging. This project aims to identify bottlenecks for supervision and hypothesises that online supervisory group meetings with…

  8. Focus Meeting 2, ``Astronomical Heritage: Progressing the UNESCO-IAU Initiative'' Introduction and overview

    Science.gov (United States)

    Ruggles, Clive; Sidorenko, Anna

    2016-10-01

    Marking seven years of formal cooperation between the IAU and the UNESCO World Heritage Centre to implement UNESCO's ``Astronomy and World Heritage'' Thematic Initiative, this Focus Meeting reviewed achievements, challenges, and progress on particular World Heritage List nomination projects.

  9. Proceedings of the meeting on the acceleration of polarized beams

    International Nuclear Information System (INIS)

    Takagi, Akira; Mori, Yoshiharu

    1980-08-01

    The project for accelerating polarized proton beam with the 12 GeV synchrotron in the National Laboratory for High Energy Physics was started in full scale, and the development of a polarized ion source of high intensity and the analysis of reduced polarization problem on the way to accelerate in the booster or the main ring have been carried out. On the other hand, with the cyclotrons in the Research Center for Nuclear Physics, Osaka University, and the Institute for Nuclear Research, University of Tokyo, and with the tandem machine in the Accelerator Center, Tsukuba University, polarized beams have already been accelerated, and the steady operations have been continued. Taking this opportunity, this study meeting was planned, considering that it is necessary to exchange informations among the researchers on polarized beam. It was the significant study meeting as unexpectedly many persons took part and the useful advices to the polarized beam project in this Laboratory were obtained. The construction of the preaccelerator for polarized protons was commenced in this year in the National Laboratory for High Energy Physics. In the proceedings, the introduction, the foreword, and eight papers are summarized. The progress of polarized beam researches in the world was mentioned in the introduction, and the project for proton acceleration in this Laboratory was explained in the foreword. (Kako, I.)

  10. US/Brazil joint pilot project objectives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

  11. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    Science.gov (United States)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  12. Report on the consultants' meeting on preparation of the proposal for a coordinated research project to update X- and γ-ray decay data standards for detector calibration

    International Nuclear Information System (INIS)

    Nichols, A.; Herman, M.

    1998-05-01

    The IAEA Nuclear Data Section has been charged by the International Nuclear Data Committee to consider the establishment of a Coordinated Research Project (CRP) to update the IAEA database of X-ray and γ-ray Standards for Detector Calibration. This CRP should re-define the radionuclides most suited for detector calibration, extending applications to safeguards, materials analysis, environmental monitoring, and medical use. This document is a report on the Consultants' Meeting held at IAEA, Vienna, between 24-25 November 1997 to assess the current needs, re-define the most suitable radionuclides, and advise the IAEA Nuclear Data Section on the need and form of such a CRP

  13. 76 FR 49753 - Strategic Environmental Research and Development Program Scientific Advisory Board Meeting

    Science.gov (United States)

    2011-08-11

    ... DEPARTMENT OF DEFENSE Office of the Secretary Strategic Environmental Research and Development Program Scientific Advisory Board Meeting AGENCY: Department of Defense. ACTION: Notice. SUMMARY: This... projects requesting Strategic Environmental Research and Development Program (SERDP) funds in excess of $1M...

  14. The demographic impact and development benefits of meeting demand for family planning with modern contraceptive methods.

    Science.gov (United States)

    Goodkind, Daniel; Lollock, Lisa; Choi, Yoonjoung; McDevitt, Thomas; West, Loraine

    2018-01-01

    Meeting demand for family planning can facilitate progress towards all major themes of the United Nations Sustainable Development Goals (SDGs): people, planet, prosperity, peace, and partnership. Many policymakers have embraced a benchmark goal that at least 75% of the demand for family planning in all countries be satisfied with modern contraceptive methods by the year 2030. This study examines the demographic impact (and development implications) of achieving the 75% benchmark in 13 developing countries that are expected to be the furthest from achieving that benchmark. Estimation of the demographic impact of achieving the 75% benchmark requires three steps in each country: 1) translate contraceptive prevalence assumptions (with and without intervention) into future fertility levels based on biometric models, 2) incorporate each pair of fertility assumptions into separate population projections, and 3) compare the demographic differences between the two population projections. Data are drawn from the United Nations, the US Census Bureau, and Demographic and Health Surveys. The demographic impact of meeting the 75% benchmark is examined via projected differences in fertility rates (average expected births per woman's reproductive lifetime), total population, growth rates, age structure, and youth dependency. On average, meeting the benchmark would imply a 16 percentage point increase in modern contraceptive prevalence by 2030 and a 20% decline in youth dependency, which portends a potential demographic dividend to spur economic growth. Improvements in meeting the demand for family planning with modern contraceptive methods can bring substantial benefits to developing countries. To our knowledge, this is the first study to show formally how such improvements can alter population size and age structure. Declines in youth dependency portend a demographic dividend, an added bonus to the already well-known benefits of meeting existing demands for family planning.

  15. Meeting of the ITER Council

    International Nuclear Information System (INIS)

    Drew, M.

    2001-01-01

    it stressed the importance of providing appropriate information on safety, environmental, and waste management aspects of ITER for wide external consideration. Taking note of the TAC Report and recommendations, the Council accepted the Draft Summary ITER Final Design Report. The Council commended the Director with Support of the JCT, the Home Teams, and Industrial Participants for their efforts to enable preparation of the Draft ITER Final Design Report in a timely manner. The Council noted with appreciation the conclusion of the TAC that ''ITER-FEAT is now ready for a decision on construction'' and the achievement of the 50% cost reduction target set in 1998. Recognizing the enhancement of the project in terms of the strengthening of the Physics Basis and the accuracy of the cost evaluation, the Council stressed the importance of maintaining the momentum of the Project. The Council considered the TAC obligations fulfilled and expressed its thanks to TAC for its consistent contribution in providing independent assurance of the scientific and technical coherence of the Project. The Council agreed to transmit the Draft Summary ITER Final Design Report and supporting technical basis to the Parties for their consideration and domestic assessment with a view to providing comments to the Director by the middle of April. This will lead inter alia to the synoptic Summary of the ITER Final Design Report suitable and available for wide distribution under the responsibility of the Director. The Council took note of the MAP Report and Advice and accepted its recommendations including, in particular, a recommendation of the proposed establishment of an ad hoc body for the exercise of continuing joint administrative responsibilities that cannot be completed within the duration of the EDA. At the invitation of the ITER, the Council agreed to meet in Vienna on 18-19 July 2001. The Council also underlined the need to commemorate the conclusion of the EDA and recognize the forthcoming

  16. Chemical Database Projects Delivered by RSC eScience

    OpenAIRE

    Williams, Antony

    2013-01-01

    This presentation is an overview of some of the projects we are involved with at RSC eScience. The presentation was given at the FDA Meeting regarding the “Development of a Freely Distributable Data System for the Registration of Substances"  

  17. Feasibility of a joint nuclear project

    International Nuclear Information System (INIS)

    Leung, C.T.

    1980-01-01

    To meet the growing power demand in the late eighties, the People's Republic of China will cooperate with Hong Kong to develop nuclear power. In this paper, the energy policy of China and her nuclear capabilities are reviewed, and some of the foreseeable problems of the China and Hong Kong joint nuclear project are discussed. (author)

  18. 76 FR 59454 - Sunshine Act Meeting; Notice of Public Meeting

    Science.gov (United States)

    2011-09-26

    ... RAILROAD RETIREMENT BOARD Sunshine Act Meeting; Notice of Public Meeting Notice is hereby given that the Railroad Retirement Board will hold a meeting on October 6, 2011, 10 a.m. at the Board's meeting room on the 8th floor of its headquarters building, 844 North Rush Street, Chicago, Illinois...

  19. Project on National Security Reform: Forging a New Shield

    Science.gov (United States)

    2008-11-01

    quoted by Joseph Nye in ―Leaders and Managers,‖ Project Syndicate , 1 May 2008, 30 September 2008 < http://www.project-syndicate.org/commentary/nye56...Bulletin of the Atomic Scientists, 18 Sept 2007, 30 Sept 2008 < http://www.thebulletin.org/web-edition/ columnists / gordon-adams/ when-national-security... Syndication ) 1179 tagging, ambient awareness, 1180 message boards, virtual social networking, document storage, and virtual meetings. Heavy emphasis is

  20. IGORR 7: Proceedings of the 7. meeting of the International Group On Research Reactors

    International Nuclear Information System (INIS)

    1999-01-01

    According to the subjects covered the papers presented at the meeting were divided into following sessions: New research reactor projects; secondary neutron sources; New research reactor facilities; Improvement of Research Reactors Facilities; Research and Development Needs

  1. Discussion as media and tool in PBL project-groups

    DEFF Research Database (Denmark)

    Spliid, Claus Monrad

    2013-01-01

    on the discussions which groups undertake in their pursuit of problem-solutions fulfilling assessed real-world needs as well as meeting the requirements of the educational program, it is concluded that discussions serve as a media for achieving learning and as a tool for developing skills essential for professional......The Aalborg PBL Model encourages project-management as a way for students to achieve efficiency and effectiveness in their study-projects. This paper looks into how the development of conversation skills relates to project-management as well as other factors. Through analysis of interviews focusing...

  2. Impact of Functional Characteristics on Usage of LSS Methods in IT and Perceived Project Success

    Science.gov (United States)

    Mushi, Francis Jeremiah

    2014-01-01

    High rates of Information Technology (IT) project failures continues; fail to meet established deadlines, exceeding budget, or not agreed-upon functionality. Failure often results from a fundamental confusion over what is involved in the project. Methods that have provided project success in Service and Manufacturing industries have not been…

  3. 78 FR 46921 - Agenda and Notice of Public Meeting of the New York Advisory Committee

    Science.gov (United States)

    2013-08-02

    ... of the meeting is for orientation and project planning. Members of the public are entitled to submit... needing accessibility services should contact the Eastern Regional Office at least 10 working days before...

  4. Proceedings of the second NATO-CCMS information meeting on dry hot rock geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Mortensen, J.J. (comp.)

    1977-11-01

    A summary is presented of the second and last NATO-CCMS (North Atlantic Treaty Organization--Committee on Challenges of Modern Society) Geothermal Pilot Study Information Meeting on Dry Hot Rock Geothermal Energy. Only summaries of the formal presentations are included. Overviews of the Energy Research and Development Administration (ERDA) and the U.S. Geological Survey (USGS) geothermal projects are included with emphasis on the Los Alamos Scientific Laboratory (LASL) Hot Dry Rock Geothermal Energy Development Project. Reports of developments in nine foreign countries and on geothermal projects in US universities are also presented.

  5. Experiences in managing the Prometheus Project

    Science.gov (United States)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  6. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  7. MANAGEMENT BOARD MEETING OF 30TH OCTOBER 2003

    CERN Multimedia

    2003-01-01

    Status Report on Earned Value Management (EVM) J. Ferguson, the EVM Project Leader, stated that EVM reporting was in a steady phase of operation. Some 1860 work units were currently active, and over 3000 of a total of 10,500 had already been completed. Issues relating to the increasing schedule variance, which was thought to be largely attributable to a sub-optimal definition of the planned value model rather than to delays in activities, were currently under discussion with the LHC Project Leader. Work on the contract alignment tool was nearing completion, with particular attention being paid to improving integration between EVM, the CFU (Contract Follow-Up) tool and the accounting system. Discussions with AB Division had resulted in the launching of a pilot project aimed at establishing a consolidated staff plan by tracking all the Division's activities within the PPT application. An EVM report had been presented to the LHC Cost and Schedule Review Committee at its meeting earlier that week and had been ver...

  8. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    Science.gov (United States)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  9. 75 FR 59292 - Meeting of the Advisory Committee; Meeting

    Science.gov (United States)

    2010-09-27

    ... inclusion on future Joint Board examinations in actuarial mathematics, pension law and methodology referred... closed meeting of the Advisory Committee on Actuarial Examinations. DATES: The meeting will be held on... INFORMATION: Notice is hereby given that the Advisory Committee on Actuarial Examinations will meet at...

  10. Women of the Manhattan Project

    Science.gov (United States)

    Marshall, Jill

    2009-10-01

    In the book Their Day in the Sun, Ruth Howes and Caroline Herzenberg documented more than 1000 women who worked on the Manhattan Project, preserving their legacy for generations to come. At the 2009 Chicago meeting, the AAPT Committee on Women in Physics celebrated the accomplishments of these women and the men who worked beside them. Howes presented an overview of the contributions of women to the development of the first nuclear weapon, and the session was honored with talks from two Manhattan project veterans, Ellen Cleminshaw Weaver, who worked at Oak Ridge, and Dorothy Marcus Gans, who worked as a technician in the Metallurgical Laboratory in Chicago. I will present a summary of the session, analyzing the effect of working on the project on the career trajectories of the women involved, and point listeners toward additional documentation of this history.

  11. Proceedings of the 3rd topical meeting on FEL and high power radiation

    International Nuclear Information System (INIS)

    Hiramatsu, Shigenori

    1994-01-01

    The meeting was held on June 10 and 11, 1993, at the National Laboratory for High Energy Physics. This is the joint study meeting with 31st large power microwave-milliwave study meeting. At the meeting, lectures were given on the report of 1st Asia FEL study meeting, infrared free electron laser (FEL) project in JAERI, present state of Free Electron Laser Research Institute Inc., infrared FEL experiment in the Institute of Scientific and Industrial Research, Osaka University, FEL experiment in UVSOR storage ring, NIJI-4 SRFEL, simulation of FEL oscillation in photo-klystron, vacuum UVFEL in PF, beam characteristics of small photon storage ring, micro-cherenkov FEL using field emission array, coherent spontaneous emission and radiation build-up in FEL oscillator, stability of soft X-ray multilayers under exposure to multipole Wigger radiation, long life Zn 2 excimer excited with relativistic electron beam, development of large power klystron in KEK, design of 1 THz gyrotron and first experiment, experiment of relativistic peniotron, experiments of 3rd and 10th cyclotron harmonic peniotron oscillators and others. (K.I.)

  12. ChE Undergraduate Research Projects in Biomedical Engineering.

    Science.gov (United States)

    Stroeve, Pieter

    1981-01-01

    Describes an undergraduate research program in biomedical engineering at the State University of New York at Buffalo. Includes goals and faculty comments on the program. Indicates that 58 percent of projects conducted between 1976 and 1980 have been presented at meetings or published. (SK)

  13. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    National Research Council Canada - National Science Library

    Garman, Michael

    2003-01-01

    ... budget. However, software projects frequently fail to meet these criteria. Software engineers, acquisition officers, and project managers have all studied this issue and made recommendations for achieving success...

  14. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  15. Research on quality assurance classification methodology for domestic AP1000 nuclear power projects

    International Nuclear Information System (INIS)

    Bai Jinhua; Jiang Huijie; Li Jingyan

    2012-01-01

    To meet the quality assurance classification requirements of domestic nuclear safety codes and standards, this paper analyzes the quality assurance classification methodology of domestic AP1000 nuclear power projects at present, and proposes the quality assurance classification methodology for subsequent AP1000 nuclear power projects. (authors)

  16. Exploring dialectical behaviour therapy clinicians' experiences of team consultation meetings.

    Science.gov (United States)

    Walsh, Cian; Ryan, Patrick; Flynn, Daniel

    2018-01-01

    This article presents a detailed idiographic analysis of Dialectical Behaviour Therapy (DBT) clinicians' experiences of team consultation meetings. DBT is an evidence-based psychological intervention with a demonstrated efficacy in the treatment of borderline personality disorder (BPD). Team consultation meetings encompass one of the primary components involved in this treatment model; where DBT clinicians regularly meet to discuss client work and enhance further learning. The present study's aim was to assess what are DBT clinicians' experiences of the consultation meeting component and whether it is useful or not. Semi-structured interviews were completed with 11 DBT clinicians (nine females, two males) from three different consultation teams. The research project utilised an interpretative phenomenological analysis (IPA) framework. Audio-recorded interview data was analysed using this framework. Four superordinate themes emerged from the interview data, which included ten subordinate themes. The superordinate themes focused on: (1) the acquisition of DBT technical knowledge and other MDT related expertise (2) participants' emotional experiences of DBT and consultation meetings, and how this can evolve over time (3) the underlying processes that occur in the consultation team including the development of a team bond and the impact of membership changes and (4) the largely consistent and reliable nature of consultation meetings and how they help maintain clinician motivation. Team consultation meetings were found to be supportive; playing an important role in maintaining clinician motivation through the availability of team support, opportunities to reflect and learn, and assistance in regulating emotions. Challenges arose in relation to team membership changes and acclimatisation to the type of feedback utilised in team consultation. The study's implications for practise are considered.

  17. Light element atom, molecule and radical behaviour in the divertor and edge plasma regions. Summary report of the 1. research coordination meeting

    International Nuclear Information System (INIS)

    Braams, B.J.

    2010-01-01

    The first research coordination meeting of the Coordinated Research Project (CRP) on Light Element Atom, Molecule and Radical Behaviour in the Divertor and Edge Plasma Regions was held 18-20 November 2009 at IAEA headquarters, bringing together experts representing 14 institutions. Participants summarized their recent and ongoing work pertinent to the research project. The specific objectives of the CRP and a detailed work plan were formulated. The discussions, conclusions and recommendations of the meeting are summarized in this report. (author)

  18. Configuring Web-based Media for Communication in Dispersed Project Groups

    DEFF Research Database (Denmark)

    Scheepers, Rens; Nicolajsen, Hanne Westh

    2006-01-01

    meetings, telephone) are not always viable options. Instead, computer-based communication media such as email, project intranets and extranets become surrogate conduits for day-to-day project communication and exchange of project-related content. We examined the effect of different media configurations......We studied how project groups in a pharmaceutical organization communicate project content. The project groups are geographically dispersed, and operate in different time zones. In such project environments, synchronous or geographically bounded modes of communication channels (e.g., face to face...... on the nature of content created by the project groups. We found that configuration decisions, notably the responsibility for content provision and who had access to content, influenced medium choice and the nature of communication taking place via the medium. More substantive content resulted when content...

  19. Sourcebook for Land Use, Land-Use Change and Forestry Projects

    OpenAIRE

    Pearson, Timothy; Walker, Sarah; Brown, Sandra

    2013-01-01

    This sourcebook is designed to be a guide for developing and implementing land use, land-use change and forestry (LULUCF) projects for the BioCarbon Fund of the World Bank that meet the requirements for the Clean Development Mechanism (CDM) of the Kyoto Protocol. Only project types and carbon pools that are eligible for credit under the CDM during the first commitment period (2008-2012) ar...

  20. 76 FR 17967 - Meeting of the Advisory Committee; Meeting

    Science.gov (United States)

    2011-03-31

    ... Joint Board examinations in actuarial mathematics, pension law and methodology referred to in 29 U.S.C... closed meeting of the Advisory Committee on Actuarial Examinations. DATES: The meeting will be held on... INFORMATION: Notice is hereby given that the Advisory Committee on Actuarial Examinations will meet at Mercer...