WorldWideScience

Sample records for progressive ratio schedule

  1. Effect of reinforcer magnitude on performance maintained by progressive-ratio schedules.

    Science.gov (United States)

    Rickard, J F; Body, S; Zhang, Z; Bradshaw, C M; Szabadi, E

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microl. Overall response rates in successive ratios conformed to a bitonic equation derived from Killeen's (1994) Mathematical Principles of Reinforcement. The "specific activation" parameter, a, which is presumed to reflect the incentive value of the reinforcer, was a monotonically increasing function of reinforcer volume; the "response time" parameter, delta, which defines the minimum response time, increased as a function of reinforcer volume; the "currency" parameter, beta, which is presumed to reflect the coupling of responses to the reinforcer, declined as a function of volume. Running response rate (response rate calculated after exclusion of the postreinforcement pause) decayed monotonically as a function of ratio size; the index of curvature of this function increased as a function of reinforcer volume. Postreinforcement pause increased as a function of ratio size. Estimates of a derived from overall response rates and postreinforcement pauses showed a modest positive correlation across conditions and between animals. Implications of the results for the quantification of reinforcer value and for the use of progressive-ratio schedules in behavioral neuroscience are discussed.

  2. Evaluation of Absolute and Relative Reinforcer Value Using Progressive-Ratio Schedules

    Science.gov (United States)

    Francisco, Monica T.; Borrero, John C.; Sy, Jolene R.

    2008-01-01

    We evaluated behavior exhibited by individuals with developmental disabilities using progressive-ratio (PR) schedules. High- and low-preference stimuli were determined based on the results of a paired-stimulus preference assessment and were evaluated in subsequent reinforcer and PR assessments using concurrent and single schedules of presentation.…

  3. A theory of behaviour on progressive ratio schedules, with applications in behavioural pharmacology.

    Science.gov (United States)

    Bradshaw, C M; Killeen, P R

    2012-08-01

    Mathematical principles of reinforcement (MPR) provide the theoretical basis for a family of models of schedule-controlled behaviour. A model of fixed-ratio schedule performance that was applied to behaviour on progressive ratio (PR) schedules showed systematic departures from the data. This study aims to derive a new model from MPR that will account for overall and running response rates in the component ratios of PR schedules, and their decline toward 0, the breakpoint. The role of pausing is represented in a real-time model containing four parameters: T (0) and k are the intercept and slope of the linear relation between post-reinforcement pause duration and the prior inter-reinforcer interval; a (specific activation) measures the incentive value of the reinforcer; δ (response time) sets biomechanical limits on response rate. Running rate is predicted to decrease with negative acceleration as ratio size increments, overall rate to increase and then decrease. Differences due to type of progression are explained as hysteresis in the control by reinforcement rates. Re-analysis of extant data focuses on the effects of acute treatment with antipsychotic drugs, lesions of the nucleus accumbens core, and destruction of orexinergic neurones of the lateral hypothalamus. The new model resolves some anomalies evident in earlier analyses, and provides new insights to the results of these interventions. Because they can render biologically relevant parameters, mathematical models can provide greater power in interpreting the effects of interventions on the processes underlying schedule-controlled behaviour than is possible for first-order data such as the breakpoint.

  4. An Evaluation of the Value of Choice-Making Opportunities in Single-Operant Arrangements: Simple Fixed- and Progressive-Ratio Schedules

    Science.gov (United States)

    Tiger, Jeffrey H.; Toussaint, Karen A.; Roath, Christopher T.

    2010-01-01

    The current study compared the effects of choice and no-choice reinforcement conditions on the task responding of 3 children with autism across 2 single-operant paradigm reinforcer assessments. The first assessment employed simple fixed-ratio (FR) schedules; the second used progressive-ratio (PR) schedules. The latter assessment identified the…

  5. On the Correspondence between Preference Assessment Outcomes and Progressive-Ratio Schedule Assessments of Stimulus Value

    Science.gov (United States)

    DeLeon, Iser G.; Frank, Michelle A.; Gregory, Meagan K.; Allman, Melissa J.

    2009-01-01

    The current study examined whether stimuli of different preference levels would be associated with different amounts of work maintained by the stimuli, as determined through progressive-ratio schedule break points. Using a paired-choice preference assessment, stimuli were classified as high, moderate, or low preference for 4 individuals with…

  6. Evidence for a role of 5-HT2C receptors in the motor aspects of performance, but not the efficacy of food reinforcers, in a progressive ratio schedule.

    Science.gov (United States)

    Bezzina, G; Body, S; Cheung, T H C; Hampson, C L; Bradshaw, C M; Glennon, J C; Szabadi, E

    2015-02-01

    5-Hydroxytryptamine2C (5-HT2C) receptor agonists reduce the breakpoint in progressive ratio schedules of reinforcement, an effect that has been attributed to a decrease of the efficacy of positive reinforcers. However, a reduction of the breakpoint may also reflect motor impairment. Mathematical models can help to differentiate between these processes. The effects of the 5-HT2C receptor agonist Ro-600175 ((αS)-6-chloro-5-fluoro-α-methyl-1H-indole-1-ethanamine) and the non-selective 5-HT receptor agonist 1-(m-chlorophenyl)piperazine (mCPP) on rats' performance on a progressive ratio schedule maintained by food pellet reinforcers were assessed using a model derived from Killeen's Behav Brain Sci 17:105-172, 1994 general theory of schedule-controlled behaviour, 'mathematical principles of reinforcement'. Rats were trained under the progressive ratio schedule, and running and overall response rates in successive ratios were analysed using the model. The effects of the agonists on estimates of the model's parameters, and the sensitivity of these effects to selective antagonists, were examined. Ro-600175 and mCPP reduced the breakpoint. Neither agonist significantly affected a (the parameter expressing incentive value), but both agonists increased δ (the parameter expressing minimum response time). The effects of both agonists could be attenuated by the selective 5-HT2C receptor antagonist SB-242084 (6-chloro-5-methyl-N-{6-[(2-methylpyridin-3-yl)oxy]pyridin-3-yl}indoline-1-carboxamide). The effect of mCPP was not altered by isamoltane, a selective 5-HT1B receptor antagonist, or MDL-100907 ((±)2,3-dimethoxyphenyl-1-(2-(4-piperidine)methanol)), a selective 5-HT2A receptor antagonist. The results are consistent with the hypothesis that the effect of the 5-HT2C receptor agonists on progressive ratio schedule performance is mediated by an impairment of motor capacity rather than by a reduction of the incentive value of the food reinforcer.

  7. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  8. Effect of quinolinic acid-induced lesions of the nucleus accumbens core on performance on a progressive ratio schedule of reinforcement: implications for inter-temporal choice.

    Science.gov (United States)

    Bezzina, G; Body, S; Cheung, T H C; Hampson, C L; Deakin, J F W; Anderson, I M; Szabadi, E; Bradshaw, C M

    2008-04-01

    The nucleus accumbens core (AcbC) is believed to contribute to the control of operant behaviour by reinforcers. Recent evidence suggests that it is not crucial for determining the incentive value of immediately available reinforcers, but is important for maintaining the values of delayed reinforcers. This study aims to examine the effect of AcbC lesions on performance on a progressive-ratio schedule using a quantitative model that dissociates effects of interventions on motor and motivational processes (Killeen 1994 Mathematical principles of reinforcement. Behav Brain Sci 17:105-172). Rats with bilateral quinolinic acid-induced lesions of the AcbC (n = 15) or sham lesions (n = 14) were trained to lever-press for food-pellet reinforcers under a progressive-ratio schedule. In Phase 1 (90 sessions) the reinforcer was one pellet; in Phase 2 (30 sessions), it was two pellets; in Phase 3, (30 sessions) it was one pellet. The performance of both groups conformed to the model of progressive-ratio performance (group mean data: r2 > 0.92). The motor parameter, delta, was significantly higher in the AcbC-lesioned than the sham-lesioned group, reflecting lower overall response rates in the lesioned group. The motivational parameter, a, was sensitive to changes in reinforcer size, but did not differ significantly between the two groups. The AcbC-lesioned group showed longer post-reinforcement pauses and lower running response rates than the sham-lesioned group. The results suggest that destruction of the AcbC impairs response capacity but does not alter the efficacy of food reinforcers. The results are consistent with recent findings that AcbC lesions do not alter sensitivity to reinforcer size in inter-temporal choice schedules.

  9. Evidence for a role of 5-HT2C receptors in the motor aspects of performance, but not the efficacy of food reinforcers, in a progressive ratio schedule

    NARCIS (Netherlands)

    Bezzina, G.; Body, S.; Cheung, T.H.; Hampson, C.L.; Bradshaw, C.M.; Glennon, J.C.; Szabadi, E.

    2015-01-01

    RATIONALE: 5-Hydroxytryptamine2C (5-HT2C) receptor agonists reduce the breakpoint in progressive ratio schedules of reinforcement, an effect that has been attributed to a decrease of the efficacy of positive reinforcers. However, a reduction of the breakpoint may also reflect motor impairment.

  10. Concurrent progressive-ratio schedules: built-in controls in the study of delayed reward efficacy.

    Science.gov (United States)

    Jarmolowicz, David P; Hudnall, Jennifer L

    2014-08-15

    Delayed rewards maintain lower rates of operant responding than immediate rewards, and when given a choice between immediate and delayed rewards, individuals typically choose the immediate reward, even when it is smaller (a phenomenon called delay discounting). The behavioral and neural mechanisms underlying these behavioral patterns, however, are not conclusively understood. The present study developed a method to examine the efficacy of delayed rewards in a way that is suitable for pharmacological manipulation of delayed reward efficacy (while controlling for general changes in reward efficacy). The progressive ratio (PR) paradigm often used to examine reward efficacy was modified such that two PR schedules for lever pressing concurrently yet independently were presented. Across a series of conditions, a range of delays (3-81s) were arranged on one of the levers while the reward on the other lever remained immediate. PR breakpoints (the highest ratio completed on each lever, our measure of reward efficacy) systematically decreased on the delayed, but not on the immediate reward lever, suggesting that delays decreased reward efficacy. This decrease in breakpoint resulted in bias in within-session responding that was accounted for by models that adjusted reward value by the delay to that reward. Unlike the standard PR paradigm, the present arrangement provided the controls needed to differentiate delay specific from general changes in reward efficacy. The present method should be helpful in the study of the behavioral and neural mechanisms of delayed reward efficacy. Modifications of the present paradigm should be useful for pharmacological studies. Copyright © 2014 Elsevier B.V. All rights reserved.

  11. Concurrent variable-interval variable-ratio schedules in a dynamic choice environment.

    Science.gov (United States)

    Bell, Matthew C; Baum, William M

    2017-11-01

    Most studies of operant choice have focused on presenting subjects with a fixed pair of schedules across many experimental sessions. Using these methods, studies of concurrent variable- interval variable-ratio schedules helped to evaluate theories of choice. More recently, a growing literature has focused on dynamic choice behavior. Those dynamic choice studies have analyzed behavior on a number of different time scales using concurrent variable-interval schedules. Following the dynamic choice approach, the present experiment examined performance on concurrent variable-interval variable-ratio schedules in a rapidly changing environment. Our objectives were to compare performance on concurrent variable-interval variable-ratio schedules with extant data on concurrent variable-interval variable-interval schedules using a dynamic choice procedure and to extend earlier work on concurrent variable-interval variable-ratio schedules. We analyzed performances at different time scales, finding strong similarities between concurrent variable-interval variable-interval and concurrent variable-interval variable- ratio performance within dynamic choice procedures. Time-based measures revealed almost identical performance in the two procedures compared with response-based measures, supporting the view that choice is best understood as time allocation. Performance at the smaller time scale of visits accorded with the tendency seen in earlier research toward developing a pattern of strong preference for and long visits to the richer alternative paired with brief "samples" at the leaner alternative ("fix and sample"). © 2017 Society for the Experimental Analysis of Behavior.

  12. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  13. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  14. Response-rate differences in variable-interval and variable-ratio schedules: An old problem revisited

    OpenAIRE

    Cole, Mark R.

    1994-01-01

    In Experiment 1, a variable-ratio 10 schedule became, successively, a variable-interval schedule with only the minimum interreinforcement intervals yoked to the variable ratio, or a variable-interval schedule with both interreinforcement intervals and reinforced interresponse times yoked to the variable ratio. Response rates in the variable-interval schedule with both interreinforcement interval and reinforced interresponse time yoking fell between the higher rates maintained by the variable-...

  15. Progressive-Ratio Schedules and Applied Behavior Analysis

    Science.gov (United States)

    Poling, Alan

    2010-01-01

    Establishing appropriate relations between the basic and applied areas of behavior analysis has been of long and persistent interest to the author. In this article, the author illustrates that there is a direct relation between how hard an organism will work for access to an object or activity, as indexed by the largest ratio completed under a…

  16. Economic Benefit from Progressive Integration of Scheduling and Control for Continuous Chemical Processes

    Directory of Open Access Journals (Sweden)

    Logan D. R. Beal

    2017-12-01

    Full Text Available Performance of integrated production scheduling and advanced process control with disturbances is summarized and reviewed with four progressive stages of scheduling and control integration and responsiveness to disturbances: open-loop segregated scheduling and control, closed-loop segregated scheduling and control, open-loop scheduling with consideration of process dynamics, and closed-loop integrated scheduling and control responsive to process disturbances and market fluctuations. Progressive economic benefit from dynamic rescheduling and integrating scheduling and control is shown on a continuously stirred tank reactor (CSTR benchmark application in closed-loop simulations over 24 h. A fixed horizon integrated scheduling and control formulation for multi-product, continuous chemical processes is utilized, in which nonlinear model predictive control (NMPC and continuous-time scheduling are combined.

  17. Selective dopamine D3 receptor antagonism by SB-277011A attenuates cocaine reinforcement as assessed by progressive-ratio and variable-cost–variable-payoff fixed-ratio cocaine self-administration in rats

    OpenAIRE

    Xi, Zheng-Xiong; Gilbert, Jeremy G.; Pak, Arlene C.; Ashby, Charles R.; Heidbreder, Christian A.; Gardner, Eliot L.

    2005-01-01

    In rats, acute administration of SB-277011A, a highly selective dopamine (DA) D3 receptor antagonist, blocks cocaine-enhanced brain stimulation reward, cocaine-seeking behaviour and reinstatement of cocaine-seeking behaviour. Here, we investigated whether SB-277011A attenuates cocaine reinforcement as assessed by cocaine self-administration under variable-cost–variable-payoff fixed-ratio (FR) and progressive-ratio (PR) reinforcement schedules. Acute i.p. administration of SB-277011A (3–24 mg/...

  18. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    Science.gov (United States)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  19. Effects of SKF-83566 and haloperidol on performance on progressive ratio schedules maintained by sucrose and corn oil reinforcement: quantitative analysis using a new model derived from the Mathematical Principles of Reinforcement (MPR).

    Science.gov (United States)

    Olarte-Sánchez, C M; Valencia-Torres, L; Cassaday, H J; Bradshaw, C M; Szabadi, E

    2013-12-01

    Mathematical models can assist the interpretation of the effects of interventions on schedule-controlled behaviour and help to differentiate between processes that may be confounded in traditional performance measures such as response rate and the breakpoint in progressive ratio (PR) schedules. The effects of a D1-like dopamine receptor antagonist, 8-bromo-2,3,4,5-tetrahydro-3-methyl-5-phenyl-1H-3-benzazepin-7-ol hydrobromide (SKF-83566), and a D2-like receptor antagonist, haloperidol, on rats' performance on PR schedules maintained by sucrose and corn oil reinforcers were assessed using a new model derived from Killeen's (Behav Brain Sci 17:105-172, 1994) Mathematical Principles of Reinforcement. Separate groups of rats were trained under a PR schedule using sucrose or corn oil reinforcers. SKF-83566 (0.015 and 0.03 mg kg(-1)) and haloperidol (0.05 and 0.1 mg kg(-1)) were administered intraperitoneally (five administrations of each treatment). Running and overall response rates in successive ratios were analysed using the new model, and estimates of the model's parameters were compared between treatments. Haloperidol reduced a (the parameter expressing incentive value) in the case of both reinforcers, but did not affect the parameters related to response time and post-reinforcement pausing. SKF-83566 reduced a and k (the parameter expressing sensitivity of post-reinforcement pausing to the prior inter-reinforcement interval) in the case of sucrose, but did not affect any of the parameters in the case of corn oil. The results are consistent with the hypothesis that blockade of both D1-like and D2-like receptors reduces the incentive value of sucrose, whereas the incentive value of corn oil is more sensitive to blockade of D2-like than D1-like receptors.

  20. Comparing fixed-amount and progressive-amount DRO Schedules for tic suppression in youth with chronic tic disorders.

    Science.gov (United States)

    Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W

    2017-01-01

    Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.

  1. Athabasca--special report No. 1, we are progressing on schedule

    Energy Technology Data Exchange (ETDEWEB)

    Moss, A E

    1966-09-01

    Since April of 1964 when the government of Alberta gave permission for the production of crude oil from the Athabasca Tar Sands, construction of a $240 million oil sands venture has been progressing according to schedule. This plant will be capable of processing 45,000 bbl of crude oil per day and will require the mining of approximately 135,000 tons of material per day. The scheduled completion date for this project is Sept. 1967. This huge project consists of the construction of various plant units and service facilities, preparation of the mine for production, construction of a highway and a multi- million dollar bridge, and the design and construction of a 16-in. pipeline 266 miles in length. A shortage of experienced engineers, supervisors, and skilled tradesmen has been the largest problem. In spite of the many problems encountered, approximately 50% of the construction has now been completed and the plant will be completed on schedule.

  2. Introducing errors in progress ratios determined from experience curves

    NARCIS (Netherlands)

    van Sark, W.G.J.H.M.

    2008-01-01

    Progress ratios (PRs) derived from historical data in experience curves are used for forecasting development of many technologies as a means to model endogenous technical change in for instance climate–economy models. These forecasts are highly sensitive to uncertainties in the progress ratio. As a

  3. Contingency discriminability and the generalized matching law describe choice on concurrent ratio schedules of wheel-running reinforcement.

    Science.gov (United States)

    Belke, Terry W

    2012-07-01

    Belke (2010) showed that on concurrent ratio schedules, the difference in ratio requirements required to produce near exclusive preference for the lower ratio alternative was substantively greater when the reinforcer was wheel running than when it was sucrose. The current study replicated this finding and showed that this choice behavior can be described by the matching law and the contingency discriminability model. Eight female Long Evans rats were exposed to concurrent VR schedules of wheel-running reinforcement (30s) and the schedule value of the initially preferred alternative was systematically increased. Two rats rapidly developed exclusive preference for the lower ratio alternative, but the majority did not - even when ratios differed by 20:1. Analysis showed that estimates of slopes from the matching law and the proportion of reinforcers misattributed from the contingency discriminability model were related to the ratios at which near exclusive preference developed. The fit of these models would be consistent with misattribution of reinforcers or poor discrimination between alternatives due to the long duration of wheel running. Copyright © 2012 Elsevier B.V. All rights reserved.

  4. Packet-Scheduling Algorithm by the Ratio of Transmit Power to the Transmission Bits in 3GPP LTE Downlink

    Directory of Open Access Journals (Sweden)

    Gil Gye-Tae

    2010-01-01

    Full Text Available Packet scheduler plays the central role in determining the overall performance of the 3GPP long-term evolution (LTE based on packet-switching operation. In this paper, a novel minimum transmit power-based (MP packet-scheduling algorithm is proposed that can achieve power-efficient transmission to the UEs while providing both system throughput gain and fairness improvement. The proposed algorithm is based on a new scheduling metric focusing on the ratio of the transmit power per bit and allocates the physical resource block (PRB to the UE that requires the least ratio of the transmit power per bit. Through computer simulation, the performance of the proposed MP packet-scheduling algorithm is compared with the conventional packet-scheduling algorithms by two primary criteria: fairness and throughput. The simulation results show that the proposed algorithm outperforms the conventional algorithms in terms of the fairness and throughput.

  5. GABA(A) and dopamine receptors in the nucleus accumbens shell differentially influence performance of a water-reinforced progressive ratio task.

    Science.gov (United States)

    Covelo, Ignacio R; Wirtshafter, David; Stratford, Thomas R

    2012-03-01

    Several authors have shown that injections of the GABA(A) agonist muscimol into the medial shell region of the nucleus accumbens (AcbSh) result in large increases in food, but not water, intake. In previous studies we demonstrated that intra-AcbSh injections of either muscimol or of the indirect dopamine agonist amphetamine increase response output on a food-reinforced progressive ratio schedule. In the current experiment we extended these observations by examining the effects of muscimol and amphetamine injections on the performance of a water-reinforced progressive ratio task in mildly deprived animals. We found that muscimol did not affect the number of responses made in the water-reinforced task, even though a marked increase in responding was observed after amphetamine. Muscimol did, however, significantly increase food intake in the same animals. The results suggest that the enhancing effects of intra-AcbSh muscimol differ from those of amphetamine in that they are selective for food-reinforced behaviors. Copyright © 2011. Published by Elsevier Inc.

  6. Evidence for positive, but not negative, behavioral contrast with wheel-running reinforcement on multiple variable-ratio schedules.

    Science.gov (United States)

    Belke, Terry W; Pierce, W David

    2016-12-01

    Rats responded on a multiple variable-ratio (VR) 10 VR 10 schedule of reinforcement in which lever pressing was reinforced by the opportunity to run in a wheel for 30s in both the changed (manipulated) and unchanged components. To generate positive contrast, the schedule of reinforcement in the changed component was shifted to extinction; to generate negative contrast, the schedule was shifted to VR 3. With the shift to extinction in the changed component, wheel-running and local lever-pressing rates increased in the unchanged component, a result supporting positive contrast; however, the shift to a VR 3 schedule in the changed component showed no evidence of negative contrast in the unaltered setting, only wheel running decreased in the unchanged component. Changes in wheel-running rates across components were consistent in showing a compensation effect, depending on whether the schedule manipulation increased or decreased opportunities for wheel running in the changed component. These findings are the first to demonstrate positive behavioral contrast on a multiple schedule with wheel running as reinforcement in both components. Copyright © 2016 Elsevier B.V. All rights reserved.

  7. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  8. Entity’s Irregular Demand Scheduling of the Wholesale Electricity Market based on the Forecast of Hourly Price Ratios

    Directory of Open Access Journals (Sweden)

    O. V. Russkov

    2015-01-01

    Full Text Available The article considers a hot issue to forecast electric power demand amounts and prices for the entities of wholesale electricity market (WEM, which are in capacity of a large user with production technology requirements prevailing over hourly energy planning ones. An electric power demand of such entities is on irregular schedule. The article analyses mathematical models, currently applied to forecast demand amounts and prices. It describes limits of time-series models and fundamental ones in case of hourly forecasting an irregular demand schedule of the electricity market entity. The features of electricity trading at WEM are carefully analysed. Factors that influence on irregularity of demand schedule of the metallurgical plant are shown. The article proposes method for the qualitative forecast of market price ratios as a tool to reduce a dependence on the accuracy of forecasting an irregular schedule of demand. It describes the differences between the offered method and the similar ones considered in research studies and scholarly works. The correlation between price ratios and relaxation in the requirements for the forecast accuracy of the electric power consumption is analysed. The efficiency function of forecast method is derived. The article puts an increased focus on description of the mathematical model based on the method of qualitative forecast. It shows main model parameters and restrictions the electricity market imposes on them. The model prototype is described as a programme module. Methods to assess an effectiveness of the proposed forecast model are examined. The positive test results of the model using JSC «Volzhsky Pipe Plant» data are given. A conclusion is drawn concerning the possibility to decrease dependence on the forecast accuracy of irregular schedule of entity’s demand at WEM. The effective trading tool has been found for the entities of irregular demand schedule at WEM. The tool application allows minimizing cost

  9. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  10. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  11. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  12. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  13. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  14. Nucleus accumbens opioid, GABaergic, and dopaminergic modulation of palatable food motivation: contrasting effects revealed by a progressive ratio study in the rat.

    Science.gov (United States)

    Zhang, Min; Balmadrid, Christian; Kelley, Ann E

    2003-04-01

    The current studies were designed to evaluate whether incentive motivation for palatable food is altered after manipulations of opioid, GABAergic, and dopaminergic transmission within the nucleus accumbens. A progressive ratio schedule was used to measure lever-pressing for sugar pellets after microinfusion of drugs into the nucleus accumbens in non-food-deprived rats. The mu opioid agonist D-Ala2, NMe-Phe4, Glyo15-enkephalin and the indirect dopamine agonist amphetamine induced a marked increase in break point and correct lever-presses; the GABA(A) agonist muscimol did not affect breakpoint or lever-presses. The data suggest that opioid, dopaminergic, and GABAergic systems within the accumbens differentially modulate food-seeking behavior through mechanisms related to hedonic evaluation of food, incentive salience, and control of motor feeding circuits, respectively.

  15. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  16. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  17. Generating variable and random schedules of reinforcement using Microsoft Excel macros.

    Science.gov (United States)

    Bancroft, Stacie L; Bourret, Jason C

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time. Generating schedule values for variable and random reinforcement schedules can be difficult. The present article describes the steps necessary to write macros in Microsoft Excel that will generate variable-ratio, variable-interval, variable-time, random-ratio, random-interval, and random-time reinforcement schedule values.

  18. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  19. One-Dimensional-Ratio Measures of Atrophy Progression in Multiple Sclerosis as Evaluated by Longitudinal Magnetic Resonance Imaging

    International Nuclear Information System (INIS)

    Martola, J.; Wiberg Kristoffersen, M.; Aspelin, P.; Stawiarz, L.; Fredrikson, S.; Hillert, J.; Bergstroem, J.; Flodmark, O.

    2009-01-01

    Background: For decades, normalized one-dimensional (1D) measures have been used in the evaluation of brain atrophy. In multiple sclerosis (MS), the use of normalized linear measures over longitudinal follow-up remains insufficiently documented. Purpose: To evaluate the association between different regional atrophy measures and disability in MS patients over four decades in a longitudinal cross-sectional study. Material and Methods: 37 consecutively selected MS patients were included. At baseline, patients had a range of disease duration (1-33 years) and age (24-65 years). Each patient was followed by magnetic resonance imaging (MRI) for a mean of 9.25 years (range 7.3-10 years). Four 1D measures were applied at three time points on axial 5-mm T1-weighted images. Three clinical MS subgroups were represented: relapsing-remitting MS (RRMS), secondary progressive MS (SPMS), and primary progressive MS (PPMS). Results: There were significant changes in all 1D ratios during follow-up. The Evans ratio (ER) and the bifrontal ratio (BFR) were associated with the development of disability. Changes of ER and BFR reflected more aggressive disease progression, as expressed by MS severity score (MSSS). Conclusion: All four normalized ratios showed uniform atrophy progression, suggesting a consistent rate of atrophy over long-term disease duration independent of MS course. Disability status correlated with 1D measures, suggesting that serial evaluation of Evans and bifrontal ratios might contribute to the radiological evaluation of MS patients

  20. 1 Tbit/inch2 Recording in Angular-Multiplexing Holographic Memory with Constant Signal-to-Scatter Ratio Schedule

    Science.gov (United States)

    Hosaka, Makoto; Ishii, Toshiki; Tanaka, Asato; Koga, Shogo; Hoshizawa, Taku

    2013-09-01

    We developed an iterative method for optimizing the exposure schedule to obtain a constant signal-to-scatter ratio (SSR) to accommodate various recording conditions and achieve high-density recording. 192 binary images were recorded in the same location of a medium in approximately 300×300 µm2 using an experimental system embedded with a blue laser diode with a 405 nm wavelength and an objective lens with a 0.85 numerical aperture. The recording density of this multiplexing corresponds to 1 Tbit/in.2. The recording exposure time was optimized through the iteration of a three-step sequence consisting of total reproduced intensity measurement, target signal calculation, and recording energy density calculation. The SSR of pages recorded with this method was almost constant throughout the entire range of the reference beam angle. The signal-to-noise ratio of the sampled pages was over 2.9 dB, which is higher than the reproducible limit of 1.5 dB in our experimental system.

  1. Selective dopamine D3 receptor antagonism by SB-277011A attenuates cocaine reinforcement as assessed by progressive-ratio and variable-cost–variable-payoff fixed-ratio cocaine self-administration in rats

    Science.gov (United States)

    Xi, Zheng-Xiong; Gilbert, Jeremy G.; Pak, Arlene C.; Ashby, Charles R.; Heidbreder, Christian A.; Gardner, Eliot L.

    2013-01-01

    In rats, acute administration of SB-277011A, a highly selective dopamine (DA) D3 receptor antagonist, blocks cocaine-enhanced brain stimulation reward, cocaine-seeking behaviour and reinstatement of cocaine-seeking behaviour. Here, we investigated whether SB-277011A attenuates cocaine reinforcement as assessed by cocaine self-administration under variable-cost–variable-payoff fixed-ratio (FR) and progressive-ratio (PR) reinforcement schedules. Acute i.p. administration of SB-277011A (3–24 mg/kg) did not significantly alter cocaine (0.75 mg/kg/infusion) self-administration reinforced under FR1 (one lever press for one cocaine infusion) conditions. However, acute administration of SB-277011A (24 mg/kg, i.p.) progressively attenuated cocaine self-administration when: (a) the unit dose of self-administered cocaine was lowered from 0.75 to 0.125–0.5 mg/kg, and (b) the work demand for cocaine reinforcement was increased from FR1 to FR10. Under PR (increasing number of lever presses for each successive cocaine infusion) cocaine reinforcement, acute administration of SB-277011A (6–24 mg/kg i.p.) lowered the PR break point for cocaine self-administration in a dose-dependent manner. The reduction in the cocaine (0.25–1.0 mg/kg) dose–response break-point curve produced by 24 mg/kg SB-277011A is consistent with a reduction in cocaine’s reinforcing efficacy. When substituted for cocaine, SB-277011A alone did not sustain self-administration behaviour. In contrast with the mixed DA D2/D3 receptor antagonist haloperidol (1 mg/kg), SB-277011A (3, 12 or 24 mg/kg) failed to impede locomotor activity, failed to impair rearing behaviour, failed to produce catalepsy and failed to impair rotarod performance. These results show that SB-277011A significantly inhibits acute cocaine-induced reinforcement except at high cocaine doses and low work requirement for cocaine. If these results extrapolate to humans, SB-277011A or similar selective DA D3 receptor antagonists may be

  2. Accuracy of progress ratios determined from experience curves: the case of photovoltaic technology development

    NARCIS (Netherlands)

    van Sark, W.G.J.H.M.|info:eu-repo/dai/nl/074628526; Alsema, E.A.|info:eu-repo/dai/nl/073416258; Junginger, H.M.|info:eu-repo/dai/nl/202130703; de Moor, H.H.C.; Schaeffer, G.J.

    2008-01-01

    Learning curves are extensively used in policy and scenario studies. Progress ratios (PRs) are derived from historical data and are used for forecasting cost development of many technologies, including photovoltaics (PV). Forecasts are highly sensitive to uncertainties in the PR. A PR usually is

  3. Use of Acoustic Emission to Monitor Progressive Damage Accumulation in KEVLAR® 49 Composites

    Science.gov (United States)

    Waller, J. M.; Andrade, E.; Saulsberry, R. L.

    2010-02-01

    Acoustic emission (AE) data acquired during intermittent load hold tensile testing of epoxy impregnated Kevlar® 49 (K/Ep) composite strands were analyzed to monitor progressive damage during the approach to tensile failure. Insight into the progressive damage of K/Ep strands was gained by monitoring AE event rate and energy. Source location based on energy attenuation and arrival time data was used to discern between significant AE attributable to microstructural damage and spurious AE attributable to noise. One of the significant findings was the observation of increasing violation of the Kaiser effect (Felicity ratio <1.0) with damage accumulation. The efficacy of three different intermittent load hold stress schedules that allowed the Felicity ratio to be determined analytically is discussed.

  4. Exclusive Preference Develops Less Readily on Concurrent Ratio Schedules with Wheel-Running than with Sucrose Reinforcement

    Science.gov (United States)

    Belke, Terry W.

    2010-01-01

    Previous research suggested that allocation of responses on concurrent schedules of wheel-running reinforcement was less sensitive to schedule differences than typically observed with more conventional reinforcers. To assess this possibility, 16 female Long Evans rats were exposed to concurrent FR FR schedules of reinforcement and the schedule…

  5. No exacerbation of knee joint pain and effusion following preoperative progressive resistance training in patients scheduled for total knee arthroplasty

    DEFF Research Database (Denmark)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas

    2017-01-01

    BACKGROUND: Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. OBJECTIVE: To examine if preoperative PRT initiated 5 weeks prior to TKA would 1......) exacerbate pain and knee effusion, 2) allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. DESIGN: Secondary analyses from a randomized controlled trial. SETTING: University Hospital and a Regional Hospital. PATIENTS: Thirty patients...... OUTCOME MEASURES: Before and after each training session, knee joint pain rated on an 11-point scale, effusion assessed by measuring the knee joint circumference, and training load were recorded. The first and last training session were initiated by 1RM testing of unilateral leg press, knee extension...

  6. Use of Acoustic Emission to Monitor Progressive Damage Accumulation in Kevlar (R) 49 Composites

    Science.gov (United States)

    Waller, Jess M.; Saulsberry, Regor L.; Andrade, Eduardo

    2009-01-01

    Acoustic emission (AE) data acquired during intermittent load hold tensile testing of epoxy impregnated Kevlar(Registeres TradeMark) 49 (K/Ep) composite strands were analyzed to monitor progressive damage during the approach to tensile failure. Insight into the progressive damage of K/Ep strands was gained by monitoring AE event rate and energy. Source location based on energy attenuation and arrival time data was used to discern between significant AE attributable to microstructural damage and spurious AE attributable to noise. One of the significant findings was the observation of increasing violation of the Kaiser effect (Felicity ratio < 1.0) with damage accumulation. The efficacy of three different intermittent load hold stress schedules that allowed the Felicity ratio to be determined analytically is discussed.

  7. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  8. Dopaminergic modulation of effort-related choice behavior as assessed by a progressive ratio chow feeding choice task: pharmacological studies and the role of individual differences.

    Directory of Open Access Journals (Sweden)

    Patrick A Randall

    Full Text Available Mesolimbic dopamine (DA is involved in behavioral activation and effort-related processes. Rats with impaired DA transmission reallocate their instrumental behavior away from food-reinforced tasks with high response requirements, and instead select less effortful food-seeking behaviors. In the present study, the effects of several drug treatments were assessed using a progressive ratio (PROG/chow feeding concurrent choice task. With this task, rats can lever press on a PROG schedule reinforced by a preferred high-carbohydrate food pellet, or alternatively approach and consume the less-preferred but concurrently available laboratory chow. Rats pass through each ratio level 15 times, after which the ratio requirement is incremented by one additional response. The DA D(2 antagonist haloperidol (0.025-0.1 mg/kg reduced number of lever presses and highest ratio achieved but did not reduce chow intake. In contrast, the adenosine A(2A antagonist MSX-3 increased lever presses and highest ratio achieved, but decreased chow consumption. The cannabinoid CB1 inverse agonist and putative appetite suppressant AM251 decreased lever presses, highest ratio achieved, and chow intake; this effect was similar to that produced by pre-feeding. Furthermore, DA-related signal transduction activity (pDARPP-32(Thr34 expression was greater in nucleus accumbens core of high responders (rats with high lever pressing output compared to low responders. Thus, the effects of DA antagonism differed greatly from those produced by pre-feeding or reduced CB1 transmission, and it appears unlikely that haloperidol reduces PROG responding because of a general reduction in primary food motivation or the unconditioned reinforcing properties of food. Furthermore, accumbens core signal transduction activity is related to individual differences in work output.

  9. The impact of exposure to shift-based schedules on medical students

    Directory of Open Access Journals (Sweden)

    David A. Williams

    2015-06-01

    Full Text Available Background: With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. Design: As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p≤0.1 were included in multivariable logistic regression models. Results: Thirty-six students (54% were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13–0.90, p=0.01 or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09–0.91, p=0.03. However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08–3.13, p=0.02 and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01–8.86, p=0.05. Conclusions: These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  10. The impact of exposure to shift-based schedules on medical students.

    Science.gov (United States)

    Williams, David A; Kogan, Jennifer R; Hauer, Karen E; Yamashita, Traci; Aagaard, Eva M

    2015-01-01

    With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p ≤ 0.1 were included in multivariable logistic regression models. Thirty-six students (54%) were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13-0.90, p = 0.01) or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09-0.91, p = 0.03). However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08-3.13, p = 0.02) and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01-8.86, p = 0.05). These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  11. The association between metacarpal ratio, radiographic hand and knee osteoarthritis and its progression after meniscectomy

    DEFF Research Database (Denmark)

    Paradowski, P T; Lohmander, Stefan; Englund, Martin Kristian

    2013-01-01

    OBJECTIVE: To examine whether the ratio of the second and fourth metacarpal bone length (MC2:MC4) in subjects with prior meniscectomy of the knee is associated with radiographic hand and knee osteoarthritis (OA) and its progression. DESIGN: We assessed 219 subjects (175 men and 44 women) twice...

  12. Progressive ratio (PR) schedules and the sipometer: Do they measure wanting, liking, and/or reward? A tribute to Anthony Sclafani and Karen Ackroff.

    Science.gov (United States)

    Kissileff, H R; Herzog, M

    2018-03-01

    This paper honors the contributions made by Anthony (Tony) Sclafani and Karen Ackroff to both the Columbia University Seminar on Appetitive Behavior and to the field of ingestive behavior in general. We review their use of the progressive ratio (PR) licking paradigm, to determine whether the taste of sucrose, independent of its post-ingestive effects, is always positively reinforcing in animals. They demonstrated a monotonic increase in licking as concentration increased, and obtained results identical to those obtained with a lever-pressing paradigm, but licking was easier and more natural than lever pressing. The PR paradigm was translated to evaluate liquid food reward value in humans. An instrument (the sipometer) was devised that initially permitted a few seconds access to small amounts of a sweet beverage as the participants increased the time to obtain it in 3-5-sec increments. The device went through two refinements and currently delivers the reinforcer and measures the pressure exerted to obtain it. The sipometer is compared with other techniques for measuring motivation and reward. The use of the sipometer and the PR method are discussed in relation to the theoretical challenges inherent in measuring motivation and pleasure, from both psychological and behavioral economics perspectives, and why it is or is not important to separate these processes for both theoretical and practical applications. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  14. A model of alcohol drinking under an intermittent access schedule using group-housed mice.

    Directory of Open Access Journals (Sweden)

    Magdalena Smutek

    Full Text Available Here, we describe a new model of voluntary alcohol drinking by group-housed mice. The model employs sensor-equipped cages that track the behaviors of the individual animals via implanted radio chips. After the animals were allowed intermittent access to alcohol (three 24 h intervals every week for 4 weeks, the proportions of licks directed toward bottles containing alcohol were 50.9% and 39.6% for the male and female mice, respectively. We used three approaches (i.e., quinine adulteration, a progressive ratio schedule and a schedule involving a risk of punishment to test for symptoms of compulsive alcohol drinking. The addition of 0.01% quinine to the alcohol solution did not significantly affect intake, but 0.03% quinine induced a greater than 5-fold reduction in the number of licks on the alcohol bottles. When the animals were required to perform increasing numbers of instrumental responses to obtain access to the bottle with alcohol (i.e., a progressive ratio schedule, they frequently reached a maximum of 21 responses irrespective of the available reward. Although the mice rarely achieved higher response criteria, the number of attempts was ∼ 10 times greater in case of alcohol than water. We have developed an approach for mapping social interactions among animals that is based on analysis of the sequences of entries into the cage corners. This approach allowed us to identify the mice that followed other animals in non-random fashions. Approximately half of the mice displayed at least one interaction of this type. We have not yet found a clear correlation between imitative behavior and relative alcohol preference. In conclusion, the model we describe avoids the limitations associated with testing isolated animals and reliably leads to stable alcohol drinking. Therefore, this model may be well suited to screening for the effects of genetic mutations or pharmacological treatments on alcohol-induced behaviors.

  15. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  16. Generating Variable and Random Schedules of Reinforcement Using Microsoft Excel Macros

    Science.gov (United States)

    Bancroft, Stacie L.; Bourret, Jason C.

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time.…

  17. Components installation. Scheduling techniques applied at Framatome for the French nuclear program

    International Nuclear Information System (INIS)

    Cremese, G.

    1982-09-01

    The first scheduling objective is a timely delivery of heavy components manufactured by FRAMATOME factories: reactor vessel, steam generators and pressurizer. The second scheduling function is the preparation and updating of overall and detailed schedules for the coordination and follow-up of: design activities, progress at equipment suppliers, construction and erection activities of sub-contractors, test and start-up tasks by FRAMATOME and customer teams, and maintenance operations by FRAMATOME teams. I shall first describe the schedules for the contract first unit then show how the following units of the contract are scheduled in their turn

  18. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Science.gov (United States)

    Gorodeski, Eiran Z; Joyce, Emer; Gandesbery, Benjamin T; Blackstone, Eugene H; Taylor, David O; Tang, W H Wilson; Starling, Randall C; Hachamovitch, Rory

    2017-01-01

    A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF) clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day. Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD) visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality) were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits). Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend). In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race. Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early arrival on

  19. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  20. The Use of Player-centered Positive Reinforcement to Schedule In-game Rewards Increases Enjoyment and Performance in a Serious Game

    Directory of Open Access Journals (Sweden)

    Aniket Nagle

    2014-10-01

    Full Text Available Among the methods used to increase enjoyment and performance in serious games, reward schedules, i.e., determining when in-game rewards should be given, have not been sufficiently explored. In the present study, we designed a simple memory training serious game and compared two methods of scheduling rewards, both based on the paradigm of positive reinforcement: fixed ratio schedule, in which rewards were given after a fixed number of correct responses, and variable ratio schedule, in which rewards were given after an unpredictable number of correct responses. To account for the variability in player preference for rewards, a player-centered sub-mode was included in both schedules by adjusting the schedule ratio according to player preference for rewards. The effectiveness of this approach was tested by comparing it against two more sub-modes: one which used a predetermined ratio, and another which set the ratio to the opposite of player preference. The game was put online and tested with 210 participants. Enjoyment, performance, duration of gameplay, and likelihood to play again were significantly higher in the player-centered sub-mode than the other sub-modes. On average, the variable-ratio schedule was better in the outcome measures than the fixed-ratio schedule. The results highlight the importance of in-game rewards, and indicate that giving rewards according to a player-centered variable-ratio schedule has the potential to make serious games more effective.

  1. Cohort fertility decline in low fertility countries: Decomposition using parity progression ratios

    Directory of Open Access Journals (Sweden)

    Krystof Zeman

    2018-02-01

    Full Text Available Background: The long-term decline in cohort fertility in highly developed countries has been widely documented. However, no systematic analysis has investigated which parity contributed most to the fertility decline to low and very low levels. Objective: We examine how the contribution of changing parity progression ratios varied across cohorts, countries, and broader regions in Europe, North America, Australia, and East Asia. We pay special attention to countries that reached very low completed cohort fertility, below 1.75 children per woman. Methods: Using population censuses and large-scale surveys for 32 low fertility countries, we decompose the change in completed cohort fertility among women born between 1940 and 1970. The decomposition method takes into account the sequential nature of childbearing as a chain of transitions from lower to higher parities. Results: Among women born between 1940 and 1955, the fertility decline was mostly driven by reductions in the progression ratios to third and higher-order births. By contrast, among women born between 1955 and 1970, changes in fertility showed distinct regional patterns: in Central and Eastern Europe they were fuelled by falling second-birth rates, whereas in the German-speaking countries, Southern Europe, and East Asia decreases in first-birth rates played the major role. Conclusions: Pathways to low and very low fertility show distinct geographical patterns, which reflect the diversity of the cultural, socioeconomic, and institutional settings of low fertility countries. Contribution: Our study highlights the importance of analysing parity-specific components of fertility in order to understand fertility change and variation. We demonstrate that similar low levels of completed cohort fertility can result from different combinations of parity-specific fertility rates.

  2. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  3. Information Flow Scheduling in Concurrent Multi-Product Development Based on DSM

    Science.gov (United States)

    Sun, Qing-Chao; Huang, Wei-Qiang; Jiang, Ying-Jie; Sun, Wei

    2017-09-01

    Multi-product collaborative development is adopted widely in manufacturing enterprise, while the present multi-project planning models don't take technical/data interactions of multiple products into account. To decrease the influence of technical/data interactions on project progresses, the information flow scheduling models based on the extended DSM is presented. Firstly, information dependencies are divided into four types: series, parallel, coupling and similar. Secondly, different types of dependencies are expressed as DSM units, and the extended DSM model is brought forward, described as a block matrix. Furthermore, the information flow scheduling methods is proposed, which involves four types of operations, where partitioning and clustering algorithm are modified from DSM for ensuring progress of high-priority project, merging and converting is the specific computation of the extended DSM. Finally, the information flow scheduling of two machine tools development is analyzed with example, and different project priorities correspond to different task sequences and total coordination cost. The proposed methodology provides a detailed instruction for information flow scheduling in multi-product development, with specially concerning technical/data interactions.

  4. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  5. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  6. Accuracy of progress ratios determined from experience curves: the case of photovoltaic technology development

    OpenAIRE

    van Sark, W.G.J.H.M.; Alsema, E.A.; Junginger, H.M.; de Moor, H.H.C.; Schaeffer, G.J.

    2008-01-01

    Learning curves are extensively used in policy and scenario studies. Progress ratios (PRs) are derived from historical data and are used for forecasting cost development of many technologies, including photovoltaics (PV). Forecasts are highly sensitive to uncertainties in the PR. A PR usually is determined together with the coefficient of determination R2, which should approach unity for a good fit of the available data. Although the R2 is instructive, we recommend using the error in the PR d...

  7. Choice with frequently changing food rates and food ratios.

    Science.gov (United States)

    Baum, William M; Davison, Michael

    2014-03-01

    In studies of operant choice, when one schedule of a concurrent pair is varied while the other is held constant, the constancy of the constant schedule may exert discriminative control over performance. In our earlier experiments, schedules varied reciprocally across components within sessions, so that while food ratio varied food rate remained constant. In the present experiment, we held one variable-interval (VI) schedule constant while varying the concurrent VI schedule within sessions. We studied five conditions, each with a different constant left VI schedule. On the right key, seven different VI schedules were presented in seven different unsignaled components. We analyzed performances at several different time scales. At the longest time scale, across conditions, behavior ratios varied with food ratios as would be expected from the generalized matching law. At shorter time scales, effects due to holding the left VI constant became more and more apparent, the shorter the time scale. In choice relations across components, preference for the left key leveled off as the right key became leaner. Interfood choice approximated strict matching for the varied right key, whereas interfood choice hardly varied at all for the constant left key. At the shortest time scale, visit patterns differed for the left and right keys. Much evidence indicated the development of a fix-and-sample pattern. In sum, the procedural difference made a large difference to performance, except for choice at the longest time scale and the fix-and-sample pattern at the shortest time scale. © Society for the Experimental Analysis of Behavior.

  8. Effects of resource management regimes on project schedule

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.S.

    2002-01-01

    This paper deals with the problem of resource scheduling within given resource constraints on a sectionalised construction project. A computer model has been developed which realistically simulates the progress of projects. A project has been selected and divided into sections whereby section

  9. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Directory of Open Access Journals (Sweden)

    Eiran Z Gorodeski

    Full Text Available A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day.Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits. Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend. In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race.Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early

  10. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  11. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  12. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  13. Progression in Running Intensity or Running Volume and the Development of Specific Injuries in Recreational Runners

    DEFF Research Database (Denmark)

    Ramskov, Daniel; Rasmussen, Sten; Sørensen, Henrik

    2018-01-01

    -training. Participants were randomized to one of two running schedules: Schedule Intensity(Sch-I) or Schedule Volume(Sch-V). Sch-I progressed the amount of high intensity running (≥88% VO2max) each week. Sch-V progressed total weekly running volume. Global positioning system watch or smartphone collected data on running...

  14. The Efficient Side of Progressive Income Taxation

    OpenAIRE

    Corneo, Giacomo

    2000-01-01

    This paper examines the allocative implications of progressive income taxation when individuals care about their relative income. It shows that tax progressivity might improve efficiency, and the more so in egalitarian economies. Introducing a progressive income tax can yield a Pareto improvement if pre-tax income is evenly distributed. Implementing undistorted choices of working hours requires a progressive tax schedule, and the optimal degree of progressivity decreases with pre-tax income i...

  15. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  16. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  17. No Exacerbation of Knee Joint Pain and Effusion Following Preoperative Progressive Resistance Training in Patients Scheduled for Total Knee Arthroplasty: Secondary Analyses From a Randomized Controlled Trial.

    Science.gov (United States)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas; Søballe, Kjeld; Mechlenburg, Inger

    2017-11-09

    Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. To examine whether preoperative PRT initiated 5 weeks prior to TKA would exacerbate pain and knee effusion, and would allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. Secondary analyses from a randomized controlled trial. University Hospital and a Regional Hospital. A total of 30 patients who were scheduled for TKA due to osteoarthritis and assigned as the intervention group. Patients underwent unilateral PRT (3 sessions per week). Exercise loading was 12 repetitions maximum (RM) with progression toward 8 RM. The training program consisted of 6 exercises performed unilaterally. Before and after each training session, knee joint pain was rated on an 11-point scale, effusion was assessed by measuring the knee joint circumference, and training load was recorded. The first and last training sessions were initiated by 1 RM testing of unilateral leg press, unilateral knee extension, and unilateral knee flexion. The median pain change score from before to after each training session was 0 at all training sessions. The average increase in knee joint effusion across the 12 training sessions was a mean 0.16 cm ± 0.23 cm. No consistent increase in knee joint effusion after training sessions during the training period was found (P = .21). Training load generally increased, and maximal muscle strength improved as follows: unilateral leg press: 18% ± 30% (P = .03); unilateral knee extension: 81% ± 156% (P knee flexion: 53% ± 57% (P knee joint pain and effusion, despite a substantial progression in loading and increased muscle strength. Concerns for side effects such as pain and effusion after PRT seem unfounded. To be determined. Copyright © 2017. Published by Elsevier Inc.

  18. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  19. The VMAT-2 inhibitor tetrabenazine affects effort-related decision making in a progressive ratio/chow feeding choice task: reversal with antidepressant drugs.

    Directory of Open Access Journals (Sweden)

    Patrick A Randall

    Full Text Available Behavioral activation is a fundamental feature of motivation, and organisms frequently make effort-related decisions based upon evaluations of reinforcement value and response costs. Furthermore, people with major depression and other disorders often show anergia, psychomotor retardation, fatigue, and alterations in effort-related decision making. Tasks measuring effort-based decision making can be used as animal models of the motivational symptoms of depression, and the present studies characterized the effort-related effects of the vesicular monoamine transport (VMAT-2 inhibitor tetrabenazine. Tetrabenazine induces depressive symptoms in humans, and also preferentially depletes dopamine (DA. Rats were assessed using a concurrent progressive ratio (PROG/chow feeding task, in which they can either lever press on a PROG schedule for preferred high-carbohydrate food, or approach and consume a less-preferred lab chow that is freely available in the chamber. Previous work has shown that the DA antagonist haloperidol reduced PROG work output on this task, but did not reduce chow intake, effects that differed substantially from those of reinforcer devaluation or appetite suppressant drugs. The present work demonstrated that tetrabenazine produced an effort-related shift in responding on the PROG/chow procedure, reducing lever presses, highest ratio achieved and time spent responding, but not reducing chow intake. Similar effects were produced by administration of the subtype selective DA antagonists ecopipam (D1 and eticlopride (D2, but not by the cannabinoid CB1 receptor neutral antagonist and putative appetite suppressant AM 4413, which suppressed both lever pressing and chow intake. The adenosine A2A antagonist MSX-3, the antidepressant and catecholamine uptake inhibitor bupropion, and the MAO-B inhibitor deprenyl, all reversed the impairments induced by tetrabenazine. This work demonstrates the potential utility of the PROG/chow procedure as a

  20. Progressive Taxation and Tax Morale

    OpenAIRE

    Philipp Doerrenberg; Andreas Peichl

    2010-01-01

    As the link between tax compliance and tax morale is found to be robust, finding the determinants of tax morale can help to understand and fight tax evasion. In this paper we analyze the effect of progressive taxation on tax morale in a cross-country approach - which has not been investigated before. Our theoretical analysis leads to two testable predictions. First, an individual's tax morale is higher, the more progressive the tax schedule is. Second, the impact of tax progressivity on tax m...

  1. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    Science.gov (United States)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  2. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  3. Scheduling reinforcement about once a day.

    Science.gov (United States)

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  4. SYSTEMATIC LITERATURE REVIEW ON RESOURCE ALLOCATION AND RESOURCE SCHEDULING IN CLOUD COMPUTING

    OpenAIRE

    B. Muni Lavanya; C. Shoba Bindu

    2016-01-01

    The objective the work is intended to highlight the key features and afford finest future directions in the research community of Resource Allocation, Resource Scheduling and Resource management from 2009 to 2016. Exemplifying how research on Resource Allocation, Resource Scheduling and Resource management has progressively increased in the past decade by inspecting articles, papers from scientific and standard publications. Survey materialized in three-fold process. Firstly, investigate on t...

  5. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  6. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  7. Behavioral effects of microwave reinforcement schedules and variations in microwave intensity on albino rats

    Energy Technology Data Exchange (ETDEWEB)

    Vitulli, W.F.; Lambert, J.K.; Brown, S.W.; Quinn, J.M.

    1987-12-01

    The objective of this exploratory investigation was to determine the interactive effects of fixed-ratio scheduling of microwave reinforcement in tandem with changes in microwave intensity. Nine albino rats were conditioned to regulate their thermal environment with microwave radiation while living in a Skinner (operant conditioning) Box in which the ambient temperature was about 27.13 degrees F at the beginning of the session. Each rat obtained a 6-sec. exposure of microwave radiation on a fixed-ratio schedule of MW reinforcement, the values of which varied from FR-1 to FR-30. Intensities of MW radiation were 62.5 W, 125 W, 250 W, and 437.5 W. Sessions lasted for 8 to 9 hr. over an approximate 13-mo. period. The effects of the intensity of microwave reinforcement varied as a function of the ratio value of the schedule used. Continuous reinforcement (FR-1) produced the lowest over-all rates, whereas FR-15, and FR-25 produced the highest over-all rates. Relatively higher thermal-behavior rates occurred under 62.5 W than under any of the other MW intensities for FR-1, FR-15, and FR-25, whereas FR-10 and FR-30 ratios produced intermediate rates of thermal responding which were constant for all values of MW intensity. These data are explained in terms of interactive effects between the local satiation or deprivation properties of the MW intensity and the ratio requirements of the schedule of MW reinforcement.

  8. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    Science.gov (United States)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  9. A stochastic model for forecast consumption in master scheduling

    NARCIS (Netherlands)

    Weeda, P.J.; Weeda, P.J.

    1994-01-01

    This paper describes a stochastic model for the reduction of the initial forecast in the Master Schedule (MS) of an MRP system during progress of time by the acceptance of customer orders. Results are given for the expectation and variance of the number of yet unknown deliveries as a function of

  10. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  11. Design and development of a continuously variable ratio transmission for an automotive vehicle, Phase IV. Quarterly progress report, December 1977--February 1978

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-28

    Progress in developing and testing a continuously variable ratio hydraulic transmission unit for automobiles is reported. Major emphasis was placed on the development of a co-axial hydrostatic module.

  12. Do scheduled caste and scheduled tribe women legislators mean lower gender-caste gaps in primary schooling in India?

    Science.gov (United States)

    Halim, Nafisa; Yount, Kathryn M; Cunningham, Solveig

    2016-07-01

    Despite India's substantial investments in primary schooling, gaps in schooling persist across gender and caste-with scheduled caste and scheduled tribe (SC/ST) girls being particularly disadvantaged. The representation of SC/ST women in state legislatures may help to mitigate this disadvantage. Specifically, because of her intersecting gender and caste/tribe identities, a SC/ST woman legislator might maintain a strong sense of solidarity especially with SC/ST girls and women, and support legislative policies benefitting SC/ST girls. Consequently, for this reason, we expect that living in a district where SC/ST women represent in state legislatures in a higher proportion may increase SC/ST girls' primary school completion, progression and performance. We tested this hypothesis using district-level data between 2000 and 2004 from the Indian Election Commission, the 2004/5 India Human Development Survey, and the Indian Census of 2001. As expected, the representation of SC/ST women in state legislatures was positively associated with SC/ST girls' grade completion and age-appropriate grade progression but was apparent not SC/ST girls' primary-school performance. SC/ST women's representation in state legislatures may reduce gender-caste gaps in primary-school attainment in India. Copyright © 2016. Published by Elsevier Inc.

  13. Adaptive scheduling with postexamining user selection under nonidentical fading

    KAUST Repository

    Gaaloul, Fakhreddine

    2012-11-01

    This paper investigates an adaptive scheduling algorithm for multiuser environments with statistically independent but nonidentically distributed (i.n.d.) channel conditions. The algorithm aims to reduce feedback load by sequentially and arbitrarily examining the user channels. It also provides improved performance by realizing postexamining best user selection. The first part of the paper presents new formulations for the statistics of the signal-to-noise ratio (SNR) of the scheduled user under i.n.d. channel conditions. The second part capitalizes on the findings in the first part and presents various performance and processing complexity measures for adaptive discrete-time transmission. The results are then extended to investigate the effect of outdated channel estimates on the statistics of the scheduled user SNR, as well as some performance measures. Numerical results are provided to clarify the usefulness of the scheduling algorithm under perfect or outdated channel estimates. © 1967-2012 IEEE.

  14. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed

    2013-05-01

    Multicopy routing strategies have been considered the most applicable approaches to achieve message delivery in Delay Tolerant Networks (DTNs). Epidemic routing and two-hop forwarding routing are two well-reported approaches for delay tolerant networks routing which allow multiple message replicas to be launched in order to increase message delivery ratio and/or reduce message delivery delay. This advantage, nonetheless, is at the expense of additional buffer space and bandwidth overhead. Thus, to achieve efficient utilization of network resources, it is important to come up with an effective message scheduling strategy to determine which messages should be forwarded and which should be dropped in case of buffer is full. This paper investigates a new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive simulation results show that the proposed message scheduling framework can achieve better performance than its counterparts.

  15. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  16. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  17. QUIESST: mid-term progress report

    NARCIS (Netherlands)

    Clairbois, J.-P.; Roo, F. de; Garai, M.; Conter, M.; Defrance, J.; Oltean-Dumbrava, C.; Fusco, I.

    2011-01-01

    The research QUIESST (QUIetening the Environment of Sustainable Surface Transport) successfully started in November 2009 for 36 months, its objectives and work schedule have already been presented at the INTERNOISE 2010 Congress. This paper will present the progress report at mid-term (18 months):

  18. Schedule goals for civilian radioactive waste management - Can we have confidence?

    International Nuclear Information System (INIS)

    Bartlett, John W.

    1992-01-01

    The schedule goals for the Civilian Radioactive Waste Management Program are to begin spent fuel receipt from reactors in 1998 and to begin waste disposal in 2010. Although there are various reasons for these goals, the most important is to set demanding goals and be responsible for achieving them. Meeting these goals requires taking into account an array of facilitators and potential inhibitors that affect schedule confidence. Facilitators include actions to prioritize the program, and make its operations efficient. These include actions to baseline activities, emphasize communications with constituencies, use help from others, and facilitate the licensing process. Inhibitors include problems in monitored storage facilities negotiations, obstruction by the State of Nevada, funding deficiencies, and technical uncertainties at Yucca Mountain. At the present time, the program can, in principle meet its schedule goals. In the near-term, the linchpin of schedule confidence is Congressional action to match the Administration's commitment to progress. (author)

  19. Techniques for establishing schedules with wheel running as reinforcement in rats.

    Science.gov (United States)

    Iversen, I H

    1993-07-01

    In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.

  20. Increased Risk of Progression of Coronary Artery Calcification in Male Subjects with High Baseline Waist-to-Height Ratio: The Kangbuk Samsung Health Study.

    Science.gov (United States)

    Oh, Hyung Geun; Nallamshetty, Shriram; Rhee, Eun Jung

    2016-02-01

    The waist-to-height ratio (WHtR) is an easy and inexpensive adiposity index that reflects central obesity. In this study, we examined the association of baseline WHtR and progression of coronary artery calcification (CAC) over 4 years of follow-up in apparently healthy Korean men. A total of 1,048 male participants (mean age, 40.9 years) in a health-screening program in Kangbuk Samsung Hospital, Seoul, Korea who repeated a medical check-up in 2010 and 2014 were recruited. Baseline WHtR was calculated using the value for the waist in 2010 divided by the value for height in 2010. The CAC score (CACS) of each subject was measured by multi-detector computed tomography in both 2010 and 2014. Progression of CAC was defined as a CACS change over 4 years greater than 0. During the follow-up period, progression of CAC occurred in 278 subjects (26.5%). The subjects with CAC progression had slightly higher but significant baseline WHtR compared to those who did not show CAC progression (0.51±0.04 vs. 0.50±0.04, P<0.01). The proportion of subjects with CAC progression significantly increased as the baseline WHtR increased from the 1st quartile to 4th quartile groups (18.3%, 18.7%, 28.8%, and 34.2%; P<0.01). The risk for CAC progression was elevated with an odds ratio of 1.602 in the 4th quartile group of baseline WHtR even after adjustment for confounding variables (95% confidence interval, 1.040 to 2.466). Increased baseline WHtR was associated with increased risk for CAC progression. WHtR might be a useful screening tool to identify individuals at high risk for subclinical atherosclerosis.

  1. Multiuser switched diversity scheduling systems with per-user threshold

    KAUST Repository

    Nam, Haewoon

    2010-05-01

    A multiuser switched diversity scheduling scheme with per-user feedback threshold is proposed and analyzed in this paper. The conventional multiuser switched diversity scheduling scheme uses a single feedback threshold for every user, where the threshold is a function of the average signal-to-noise ratios (SNRs) of the users as well as the number of users involved in the scheduling process. The proposed scheme, however, constructs a sequence of feedback thresholds instead of a single feedback threshold such that each user compares its channel quality with the corresponding feedback threshold in the sequence. Numerical and simulation results show that thanks to the flexibility of threshold selection, where a potentially different threshold can be used for each user, the proposed scheme provides a higher system capacity than that for the conventional scheme. © 2006 IEEE.

  2. Can the neutrophil-to-lymphocyte ratio be used to predict recurrence and progression of non-muscle-invasive bladder cancer?

    Directory of Open Access Journals (Sweden)

    Sebahattin Albayrak

    2016-06-01

    Full Text Available The aim of our study was to evaluate whether neutrophil-to-lymphocyte ratio (NLR is a predictor of disease progression and recurrence in patients with primary non-muscle-invasive bladder cancer (NMIBC. This was a prospective study of 86 patients with newly diagnosed NMIBC. The patients were classified by the number of points assigned by the European Organization for Research and Treatment of Cancer risk tables. The correlation between progression score, recurrence score, age, mean platelet volume, red blood cell distribution width and NLR was assessed statistically. The same parameters were compared between the risk groups. A significant difference in NLR and age values was observed between recurrence and progression risk score groups. The relationships between NLR and recurrence and progression risk scores were no longer significant after correcting for the statistical effect of age on scores. Age was significantly different between groups after adjusting for NLR. Our study revealed that NLR and age were associated with patient age and bladder tumor progression and recurrence risk scores. After correcting for age, the significant relationship with NLR was lost, in contrast to some previous studies. We recommend that patient age should be corrected to avoid misleading results in NLR studies.

  3. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Shihada, Basem

    2012-01-01

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  4. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed

    2012-08-19

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  5. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  6. Intercell scheduling: A negotiation approach using multi-agent coalitions

    Science.gov (United States)

    Tian, Yunna; Li, Dongni; Zheng, Dan; Jia, Yunde

    2016-10-01

    Intercell scheduling problems arise as a result of intercell transfers in cellular manufacturing systems. Flexible intercell routes are considered in this article, and a coalition-based scheduling (CBS) approach using distributed multi-agent negotiation is developed. Taking advantage of the extended vision of the coalition agents, the global optimization is improved and the communication cost is reduced. The objective of the addressed problem is to minimize mean tardiness. Computational results show that, compared with the widely used combinatorial rules, CBS provides better performance not only in minimizing the objective, i.e. mean tardiness, but also in minimizing auxiliary measures such as maximum completion time, mean flow time and the ratio of tardy parts. Moreover, CBS is better than the existing intercell scheduling approach for the same problem with respect to the solution quality and computational costs.

  7. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  8. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Naik, K.; Shihada, Basem

    2013-01-01

    new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive

  9. Flowshop Scheduling Problems with a Position-Dependent Exponential Learning Effect

    Directory of Open Access Journals (Sweden)

    Mingbao Cheng

    2013-01-01

    Full Text Available We consider a permutation flowshop scheduling problem with a position-dependent exponential learning effect. The objective is to minimize the performance criteria of makespan and the total flow time. For the two-machine flow shop scheduling case, we show that Johnson’s rule is not an optimal algorithm for minimizing the makespan given the exponential learning effect. Furthermore, by using the shortest total processing times first (STPT rule, we construct the worst-case performance ratios for both criteria. Finally, a polynomial-time algorithm is proposed for special cases of the studied problem.

  10. Radical radiotherapy for invasive bladder cancer: What dose and fractionation schedule to choose?

    International Nuclear Information System (INIS)

    Pos, Floris J.; Hart, Guus; Schneider, Christoph; Sminia, Peter

    2006-01-01

    Purpose: To establish the α/β ratio of bladder cancer from different radiotherapy schedules reported in the literature and provide guidelines for the design of new treatment schemes. Methods and Materials: Ten external beam radiotherapy (EBRT) and five brachytherapy schedules were selected. The biologically effective dose (BED) of each schedule was calculated. Logistic modeling was used to describe the relationship between 3-year local control (LC3y) and BED. Results: The estimated α/β ratio was 13 Gy (95% confidence interval [CI], 2.5-69 Gy) for EBRT and 24 Gy (95% CI, 1.3-460 Gy) for EBRT and brachytherapy combined. There is evidence for an overall dose-response relationship. After an increase in total dose of 10 Gy, the odds of LC3y increase by a factor of 1.44 (95% CI, 1.23-1.70) for EBRT and 1.47 (95% CI, 1.25-1.72) for the data sets of EBRT and brachytherapy combined. Conclusion: With the clinical data currently available, a reliable estimation of the α/β ratio for bladder cancer is not feasible. It seems reasonable to use a conventional α/β ratio of 10-15 Gy. Dose escalation could significantly increase local control. There is no evidence to support short overall treatment times or large fraction sizes in radiotherapy for bladder cancer

  11. Continuity-Aware Scheduling Algorithm for Scalable Video Streaming

    Directory of Open Access Journals (Sweden)

    Atinat Palawan

    2016-05-01

    Full Text Available The consumer demand for retrieving and delivering visual content through consumer electronic devices has increased rapidly in recent years. The quality of video in packet networks is susceptible to certain traffic characteristics: average bandwidth availability, loss, delay and delay variation (jitter. This paper presents a scheduling algorithm that modifies the stream of scalable video to combat jitter. The algorithm provides unequal look-ahead by safeguarding the base layer (without the need for overhead of the scalable video. The results of the experiments show that our scheduling algorithm reduces the number of frames with a violated deadline and significantly improves the continuity of the video stream without compromising the average Y Peek Signal-to-Noise Ratio (PSNR.

  12. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  13. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  14. CERN concludes year of strong progress towards the LHC

    CERN Multimedia

    2006-01-01

    Speaking at the 135th session of the CERN Council, the Director General, Robert Aymar, hailed a year of impressive progress towards the LHC project. 'In one year, we have made great progress,' he said. 'The challenge is not over, of course, but we have great confidence of maintaining the schedule for start-up in 2007.'

  15. Parallel Machine Scheduling with Batch Delivery to Two Customers

    Directory of Open Access Journals (Sweden)

    Xueling Zhong

    2015-01-01

    Full Text Available In some make-to-order supply chains, the manufacturer needs to process and deliver products for customers at different locations. To coordinate production and distribution operations at the detailed scheduling level, we study a parallel machine scheduling model with batch delivery to two customers by vehicle routing method. In this model, the supply chain consists of a processing facility with m parallel machines and two customers. A set of jobs containing n1 jobs from customer 1 and n2 jobs from customer 2 are first processed in the processing facility and then delivered to the customers directly without intermediate inventory. The problem is to find a joint schedule of production and distribution such that the tradeoff between maximum arrival time of the jobs and total distribution cost is minimized. The distribution cost of a delivery shipment consists of a fixed charge and a variable cost proportional to the total distance of the route taken by the shipment. We provide polynomial time heuristics with worst-case performance analysis for the problem. If m=2 and (n1-b(n2-b<0, we propose a heuristic with worst-case ratio bound of 3/2, where b is the capacity of the delivery shipment. Otherwise, the worst-case ratio bound of the heuristic we propose is 2-2/(m+1.

  16. 10 CFR 905.14 - Does Western require annual IRP progress reports?

    Science.gov (United States)

    2010-01-01

    ... Section 905.14 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.14 Does Western require annual IRP progress reports? Yes, customers must submit IRP progress... projected goals and implementation schedules, and energy and capacity benefits and renewable energy...

  17. Specimen aspect ratio and progressive field strain development of sandstone under uniaxial compression by three-dimensional digital image correlation

    Directory of Open Access Journals (Sweden)

    H. Munoz

    2017-08-01

    Full Text Available The complete stress–strain characteristics of sandstone specimens were investigated in a series of quasi-static monotonic uniaxial compression tests. Strain patterns development during pre- and post-peak behaviours in specimens with different aspect ratios was also examined. Peak stress, post-peak portion of stress–strain, brittleness, characteristics of progressive localisation and field strain patterns development were affected at different extents by specimen aspect ratio. Strain patterns of the rocks were obtained by applying three-dimensional (3D digital image correlation (DIC technique. Unlike conventional strain measurement using strain gauges attached to specimen, 3D DIC allowed not only measuring large strains, but more importantly, mapping the development of field strain throughout the compression test, i.e. in pre- and post-peak regimes. Field strain development in the surface of rock specimen suggests that strain starts localising progressively and develops at a lower rate in pre-peak regime. However, in post-peak regime, strains increase at different rates as local deformations take place at different extents in the vicinity and outside the localised zone. The extent of localised strains together with the rate of strain localisation is associated with the increase in rate of strength degradation. Strain localisation and local inelastic unloading outside the localised zone both feature post-peak regime.

  18. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  19. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  20. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  1. Potential support ratios

    DEFF Research Database (Denmark)

    Kjærgaard, Søren; Canudas-Romo, Vladimir

    2017-01-01

    The ‘prospective potential support ratio’ has been proposed by researchers as a measure that accurately quantifies the burden of ageing, by identifying the fraction of a population that has passed a certain measure of longevity, for example, 17 years of life expectancy. Nevertheless......, the prospective potential support ratio usually focuses on the current mortality schedule, or period life expectancy. Instead, in this paper we look at the actual mortality experienced by cohorts in a population, using cohort life tables. We analyse differences between the two perspectives using mortality models...

  2. Inequality reducing properties of progressive income tax schedules: The case of endogenous income

    OpenAIRE

    Carbonell-Nicolau, Oriol; Llavador, Humberto

    2016-01-01

    The case for progressive income taxation is often based on the classic result of Jakobsson (1976) and Fellman (1976), according to which progressive and only progressive income taxes - in the sense of increasing average tax rates on income - ensure a reduction in income inequality. This result has been criticized on the ground that it ignores the possible disincentive effect of taxation on work effort, and the resolution of this critique has been a long-standing problem in public finance. Thi...

  3. AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report

    Science.gov (United States)

    2016-06-18

    Sally Ride. • Two full 20-foot IOL shipping containers scheduled for delivery DCI on Monday. • Spares Load out scheduled for next week. 4. Operator...the silty water. 2 • Anchor Windlass – Design using “ulster” chain guide is progressing. Yesterday’s development regarding foreign chain...J-1 at sustained speed. See Airborne Noise Survey Report (DI-032-006) for more information (Delete after RFW approved) 1137 HVAC - There were no

  4. Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

    International Nuclear Information System (INIS)

    Xie, Mengfei; Zhou, Jianzhong; Li, Chunlong; Zhu, Shuang

    2015-01-01

    Highlights: • Monthly streamflow forecasting error is considered. • An improved parallel progressive optimality algorithm is proposed. • Forecasting dispatching chart is manufactured accompanying with a set of rules. • Applications in Xiluodu and Xiangjiaba cascade hydro plants. - Abstract: Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data, the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves

  5. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  6. Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

    National Research Council Canada - National Science Library

    York, Michael A

    2008-01-01

    .... This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels...

  7. Multiple determinants of transfer of evaluative function after conditioning with free-operant schedules of reinforcement.

    Science.gov (United States)

    Dack, Charlotte; Reed, Phil; McHugh, Louise

    2010-11-01

    The aim of the four present experiments was to explore how different schedules of reinforcement influence schedule-induced behavior, their impact on evaluative ratings given to conditioned stimuli associated with each schedule through evaluative conditioning, and the transfer of these evaluations through derived stimulus networks. Experiment 1 compared two contrasting response reinforcement rules (variable ratio [VR], variable interval [VI]). Experiment 2 varied the response to reinforcement rule between two schedules but equated the outcome to response rate (differential reinforcement of high rate [DRH] vs. VR). Experiment 3 compared molar and molecular aspects of contingencies of reinforcement (tandem VIVR vs. tandem VRVI). Finally, Experiment 4 employed schedules that induced low rates of responding to determine whether, under these circumstances, responses were more sensitive to the molecular aspects of a schedule (differential reinforcement of low rate [DRL] vs. VI). The findings suggest that the transfer of evaluative functions is determined mainly by differences in response rate between the schedules and the molar aspects of the schedules. However, when neither schedule was based on a strong response reinforcement rule, the transfer of evaluative judgments came under the control of the molecular aspects of the schedule.

  8. Online scheduling policies for multiclass call centers with impatient customers

    NARCIS (Netherlands)

    Jouini, O.; Pot, S.A.; Koole, G.M.; Dallery, Y.

    2010-01-01

    We consider a call center with two classes of impatient customers: premium and regular classes. Modeling our call center as a multiclass GI / GI / s + M queue, we focus on developing scheduling policies that satisfy a target ratio constraint on the abandonment probabilities of premium customers to

  9. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  10. Dwell scheduling algorithm based on analyzing scheduling interval for digital array radar%数字阵列雷达波束驻留调度间隔分析算法

    Institute of Scientific and Technical Information of China (English)

    赵洪涛; 程婷; 何子述

    2011-01-01

    针对数字阵列雷达波束驻留调度问题,研究了基于调度间隔分析的调度算法.该算法综合分析了1个调度间隔内申请执行的波束驻留任务,且调度过程中进行了脉冲交错.调度准则充分考虑了任务的工作方式优先级和截止期,并以任务丢失率、实现价值率、系统时间利用率作为评估指标.仿真结果表明修正截止期准则主要强调任务的紧迫性,修正工作方式优先级主要强调任务的重要性,而截止期--工作方式优先级和工作方式--截止期调度准则可以在二者间更好地折中,在总体性能上要优于其他调度准则.%Aiming at the problem of beam-dwell scheduling for digital array radar, the algorithm based on analyzing scheduling interval was studied. This algorithm analyzed the dwells applied to be executed in one scheduling interval and introduced pulse interleaving. The scheduling criterion took both priorities and deadlines into account fully, with the Task Drop Ratio, Hit Value Ratio, Time Utilization Ratio as evaluation indexes. The simulation results showed that the modified deadline criterion mainly emphasized the urgency of tasks, while the modified priority criterion mainly emphasized the importance of tasks; the deadline-priority and priority-deadline scheduling criterions could make good balance between urgency and importance. thus superior to other criterions in overall performances.

  11. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  12. Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.

  13. Performance Evaluation of New Joint EDF-RM Scheduling Algorithm for Real Time Distributed System

    Directory of Open Access Journals (Sweden)

    Rashmi Sharma

    2014-01-01

    Full Text Available In Real Time System, the achievement of deadline is the main target of every scheduling algorithm. Earliest Deadline First (EDF, Rate Monotonic (RM, and least Laxity First are some renowned algorithms that work well in their own context. As we know, there is a very common problem Domino's effect in EDF that is generated due to overloading condition (EDF is not working well in overloading situation. Similarly, performance of RM is degraded in underloading condition. We can say that both algorithms are complements of each other. Deadline missing in both events happens because of their utilization bounding strategy. Therefore, in this paper we are proposing a new scheduling algorithm that carries through the drawback of both existing algorithms. Joint EDF-RM scheduling algorithm is implemented in global scheduler that permits task migration mechanism in between processors in the system. In order to check the improved behavior of proposed algorithm we perform simulation. Results are achieved and evaluated in terms of Success Ratio (SR, Average CPU Utilization (ECU, Failure Ratio (FR, and Maximum Tardiness parameters. In the end, the results are compared with the existing (EDF, RM, and D_R_EDF algorithms. It has been shown that the proposed algorithm performs better during overloading condition as well in underloading condition.

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  15. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  16. Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology

    Science.gov (United States)

    Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot

    2004-01-01

    The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…

  17. Permutation flow-shop scheduling problem to optimize a quadratic objective function

    Science.gov (United States)

    Ren, Tao; Zhao, Peng; Zhang, Da; Liu, Bingqian; Yuan, Huawei; Bai, Danyu

    2017-09-01

    A flow-shop scheduling model enables appropriate sequencing for each job and for processing on a set of machines in compliance with identical processing orders. The objective is to achieve a feasible schedule for optimizing a given criterion. Permutation is a special setting of the model in which the processing order of the jobs on the machines is identical for each subsequent step of processing. This article addresses the permutation flow-shop scheduling problem to minimize the criterion of total weighted quadratic completion time. With a probability hypothesis, the asymptotic optimality of the weighted shortest processing time schedule under a consistency condition (WSPT-CC) is proven for sufficiently large-scale problems. However, the worst case performance ratio of the WSPT-CC schedule is the square of the number of machines in certain situations. A discrete differential evolution algorithm, where a new crossover method with multiple-point insertion is used to improve the final outcome, is presented to obtain high-quality solutions for moderate-scale problems. A sequence-independent lower bound is designed for pruning in a branch-and-bound algorithm for small-scale problems. A set of random experiments demonstrates the performance of the lower bound and the effectiveness of the proposed algorithms.

  18. Development of new low level radioactive waste disposal sites: A progress report

    International Nuclear Information System (INIS)

    Anderson, Robert T.; Antonucci, George J.; Ryan, Michael T.

    1992-01-01

    The status of the development of three new low level radioactive waste disposal facilities for the Central Midwest (Illinois), Southeastern (North Carolina) and Appalachian (Pennsylvania) compacts is presented. These three sites will dispose of about 50-65 percent of the commercial low-level waste (LLW) generated in the U.S. annually. Chem-Nuclear, as developer and proposed operator of all three sites has used a common approach to site development. This approach has been based on their twenty-plus years of operating experience and a standard technical approach. The technology employed is an above-grade, multiple engineered barrier design. The paper also contrasts actual progress at each site with a generalized project schedule. Areas of schedule delays are noted along with the steps being taken to accelerate schedule. Finally, we note that continued progress and timely start-up of operations of these new sites is critical on a national basis. This is due to the possibility of near-term closure of the existing LLW disposal sites. (author)

  19. Slow phasic changes in nucleus accumbens dopamine release during fixed ratio acquisition: a microdialysis study.

    Science.gov (United States)

    Segovia, K N; Correa, M; Salamone, J D

    2011-11-24

    Nucleus accumbens dopamine (DA) is a critical component of the brain circuitry regulating behavioral output during reinforcement-seeking behavior. Several studies have investigated the characteristics of accumbens DA release during the performance of well-learned operant behaviors, but relatively few have focused on the initial acquisition of particular instrumental behaviors or operant schedules. The present experiments focused on the initial acquisition of operant performance on a reinforcement schedule by studying the transition from a fixed ratio 1 (FR1) schedule to another operant schedule with a higher ratio requirement (i.e. fixed ratio 5 [FR5]). Microdialysis sessions were conducted in different groups of rats that were tested on either the FR1 schedule; the first, second, or third day of FR5 training; or after weeks of FR5 training. Consistent with previous studies, well-trained rats performing on the FR5 schedule after weeks of training showed significant increases in extracellular DA in both core and shell subregions of nucleus accumbens during the behavioral session. On the first day of FR5 training, there was a substantial increase in DA release in nucleus accumbens shell (i.e. approximately 300% of baseline). In contrast, accumbens core DA release was greatest on the second day of FR5 training. In parallel experiments, DA release in core and shell subregions did not significantly increase during free consumption of the same high carbohydrate food pellets that were used in the operant experiments, despite the very high levels of food intake in experienced rats. However, in rats exposed to the high-carbohydrate food for the first time, there was a tendency for extracellular DA to show a small increase. These results demonstrate that transient increases in accumbens DA release occur during the initial acquisition of ratio performance, and suggest that core and shell subregions show different temporal patterns during acquisition of instrumental behavior

  20. Progressively safer, cheaper demolition of Fernald

    International Nuclear Information System (INIS)

    Nichols, Robert; Pennington, Norman

    2000-01-01

    Fluor Fernald, Inc. has been progressively improving Decontamination and Dismantlement (D and D) at the Department of Energy's Fernald Environmental Management Project by applying new technologies and better methodologies to the work. Demolition issues existed in the past that necessitated new or improved solutions to maintain worker safety, protect the environment and accomplish the work in a cost effective manner. Lessons learned from D and D of 80 structures has led to a systematic approach, which can be implemented in various D and D arenas. When facility production was halted, hold-up material and process residues remained in the process piping and components. Over 500,000 pounds of material was removed by workers who completed the tasks two years ahead of schedule, $7 million under budget and with an excellent safety record. This success was the result of detailed planning and irdision of lessons learned as work progressed from facility to facility. Work sequences were developed that reduced airborne contamination. Demolition of structures has been performed at Fernald by carefully selected and qualified subcontractors. Asbestos and lead abatement, equipment, piping and conduit removal, and structural demolition have been completed to progressively higher performance specifications developed by Fluor Fernald based on lessons learned during execution. Safety continues to be the primary consideration in performing potentially hazardous work. Technologies such as hydraulic shears have been developed and used to keep workers away from danger. A new technology, ''Cool Suits,'' has been demonstrated to help prevent heat stress when anti-contamination clothing is required in elevated temperature working conditions. For tall structures, implosion technologies have been employed with progressively improved results, Several other new technologies have been evaluated by Fluor Fernald and applied by subcontractors. The improved technologies included the oxy-gas torch

  1. The impact of sex ratio and economic status on local birth rates

    OpenAIRE

    Chipman, A.; Morrison, E.

    2013-01-01

    Human mating and reproductive behaviour can vary depending on various mechanisms, including the local sex ratio. Previous research shows that as sex ratios become female-biased, women from economically deprived areas are less likely to delay reproductive opportunities to wait for a high-investing mate but instead begin their reproductive careers sooner. Here, we show that the local sex ratio also has an impact on female fertility schedules. At young ages, a female-biased ratio is associated w...

  2. Military Free Fall Scheduling And Manifest Optimization Model

    Science.gov (United States)

    2016-12-01

    zone. As interest in qualifying more personnel increased, the course expanded. By the mid-1990s, Reyes explains, a new location was required to better...Since 2005, the Chilean Professional Soccer Association has used operations research techniques to schedule professional leagues in Chile . These...a new parachute the students are using, the RA-1. The RA-1 parachute has a longer glide ratio, which means the rate of descent is slower than with

  3. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  4. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  5. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  6. UNPACKING THE DIFFERENTIAL IMPACT OF FAMILY PLANNING POLICIES IN CHINA: ANALYSIS OF PARITY PROGRESSION RATIOS FROM RETROSPECTIVE BIRTH HISTORY DATA, 1971-2005.

    Science.gov (United States)

    Qin, Min; Falkingham, Jane; Padmadas, Sabu S

    2018-01-10

    Although China's family planning programme is often referred to in the singular, most notably the One-Child policy, in reality there have been a number of different policies in place simultaneously, targeted at different sub-populations characterized by region and socioeconomic conditions. This study attempted to systematically assess the differential impact of China's family planning programmes over the past 40 years. The contribution of Parity Progression Ratios to fertility change among different sub-populations exposed to various family planning policies over time was assessed. Cross-sectional birth history data from six consecutive rounds of nationally representative population and family planning surveys from the early 1970s until the mid-2000s were used, covering all geographical regions of China. Four sub-populations exposed to differential family planning regimes were identified. The analyses provide compelling evidence of the influential role of family planning policies in reducing higher Parity Progression Ratios across different sub-populations, particularly in urban China where fertility dropped to replacement level even before the implementation of the One-Child policy. The prevailing socioeconomic conditions in turn have been instrumental in adapting and accelerating family planning policy responses to reducing fertility levels across China.

  7. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  8. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  9. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  10. Analisis Performansi Algoritma Penjadwalan Log Rule dan Frame Level Schedule Skenario Multicell Pada Layer Mac LTE

    Directory of Open Access Journals (Sweden)

    Ridwan

    2016-03-01

    Full Text Available Mobile telecommunications technology gradually evolved to support better services such as voice, data, and video to users of telecommunications services. LTE (Long Term Evolution is a network based on Internet Protocol (IP standardized by 3rd Generation Partnership Project (3GPP. To support it, LTE requires a mechanism that can support. One of them by applying methods of scheduling packets in each service. Scheduling is a different treatment to packets that come in accordance with the priorities of the scheduling algorithm. In this research, to analyze the performance of LTE with paramater delay, packet loss ratio, throughput and fairness index uses a scheduling algorithms Frame Level Schedule (FLS and Log Rule on LTE-Simulator with scenarios using Voip traffic, Video and Best Effort (BE. The results is scheduling algorithms FLS is better than log rule in term of throughput values, while of scheduling algorithms log rule is better than FLS in terms of delay based on the number and speed of the users. This indicates that both scheduling algorithms suitable for use in LTE networks within conditions of traffic real time services, but not for non real time services such as BE.

  11. New Approaches to Irrigation Scheduling of Vegetables

    Directory of Open Access Journals (Sweden)

    Michael D. Cahn

    2017-04-01

    Full Text Available Using evapotranspiration (ET data for scheduling irrigations on vegetable farms is challenging due to imprecise crop coefficients, time consuming computations, and the need to simultaneously manage many fields. Meanwhile, the adoption of soil moisture monitoring in vegetables has historically been limited by sensor accuracy and cost, as well as labor required for installation, removal, and collection of readings. With recent improvements in sensor technology, public weather-station networks, satellite and aerial imaging, wireless communications, and cloud computing, many of the difficulties in using ET data and soil moisture sensors for irrigation scheduling of vegetables can now be addressed. Web and smartphone applications have been developed that automate many of the calculations involved in ET-based irrigation scheduling. Soil moisture sensor data can be collected through wireless networks and accessed using web browser or smartphone apps. Energy balance methods of crop ET estimation, such as eddy covariance and Bowen ratio, provide research options for further developing and evaluating crop coefficient guidelines of vegetables, while recent advancements in surface renewal instrumentation have led to a relatively low-cost tool for monitoring crop water requirement in commercial farms. Remote sensing of crops using satellite, manned aircraft, and UAV platforms may also provide useful tools for vegetable growers to evaluate crop development, plant stress, water consumption, and irrigation system performance.

  12. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  13. Progress in nanoscale dry processes for fabrication of high-aspect-ratio features: How can we control critical dimension uniformity at the bottom?

    Science.gov (United States)

    Ishikawa, Kenji; Karahashi, Kazuhiro; Ishijima, Tatsuo; Cho, Sung Il; Elliott, Simon; Hausmann, Dennis; Mocuta, Dan; Wilson, Aaron; Kinoshita, Keizo

    2018-06-01

    In this review, we discuss the progress of emerging dry processes for nanoscale fabrication of high-aspect-ratio features, including emerging design technology for manufacturability. Experts in the fields of plasma processing have contributed to addressing the increasingly challenging demands of nanoscale deposition and etching technologies for high-aspect-ratio features. The discussion of our atomic-scale understanding of physicochemical reactions involving ion bombardment and neutral transport presents the major challenges shared across the plasma science and technology community. Focus is placed on advances in fabrication technology that control surface reactions on three-dimensional features, as well as state-of-the-art techniques used in semiconductor manufacturing with a brief summary of future challenges.

  14. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  15. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  16. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  17. The Impact of the Implementation Cost of Replication in Data Grid Job Scheduling

    Directory of Open Access Journals (Sweden)

    Babar Nazir

    2018-05-01

    Full Text Available Data Grids deal with geographically-distributed large-scale data-intensive applications. Schemes scheduled for data grids attempt to not only improve data access time, but also aim to improve the ratio of data availability to a node, where the data requests are generated. Data replication techniques manage large data by storing a number of data files efficiently. In this paper, we propose centralized dynamic scheduling strategy-replica placement strategies (CDSS-RPS. CDSS-RPS schedule the data and task so that it minimizes the implementation cost and data transfer time. CDSS-RPS consists of two algorithms, namely (a centralized dynamic scheduling (CDS and (b replica placement strategy (RPS. CDS considers the computing capacity of a node and finds an appropriate location for the job. RPS attempts to improve file access time by using replication on the basis of number of accesses, storage capacity of a computing node, and response time of a requested file. Extensive simulations are carried out to demonstrate the effectiveness of the proposed strategy. Simulation results demonstrate that the replication and scheduling strategies improve the implementation cost and average access time significantly.

  18. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  19. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  20. Lead isotope ratios in artists' lead white: a progress report

    Energy Technology Data Exchange (ETDEWEB)

    Keisch, B; Callahan, R C [Carnegie-Mellon Univ., Pittsburgh, Pa. (USA)

    1976-07-01

    The lead isotope ratios in over four hundred samples of lead white have been determined. The samples represent various geographical sources and dates from the thirteenth century to the present. A new method for organizing this large volume of data is described which helps with the visualization of temporal and geographic patterns. A number of interesting relationships between lead isotope ratio and date or source are shown to exist. Some examples of successful applications of this methodology are described.

  1. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  2. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  3. Workflow as a Service in the Cloud: Architecture and Scheduling Algorithms

    Science.gov (United States)

    Wang, Jianwu; Korambath, Prakashan; Altintas, Ilkay; Davis, Jim; Crawl, Daniel

    2017-01-01

    With more and more workflow systems adopting cloud as their execution environment, it becomes increasingly challenging on how to efficiently manage various workflows, virtual machines (VMs) and workflow execution on VM instances. To make the system scalable and easy-to-extend, we design a Workflow as a Service (WFaaS) architecture with independent services. A core part of the architecture is how to efficiently respond continuous workflow requests from users and schedule their executions in the cloud. Based on different targets, we propose four heuristic workflow scheduling algorithms for the WFaaS architecture, and analyze the differences and best usages of the algorithms in terms of performance, cost and the price/performance ratio via experimental studies. PMID:29399237

  4. Workflow as a Service in the Cloud: Architecture and Scheduling Algorithms.

    Science.gov (United States)

    Wang, Jianwu; Korambath, Prakashan; Altintas, Ilkay; Davis, Jim; Crawl, Daniel

    2014-01-01

    With more and more workflow systems adopting cloud as their execution environment, it becomes increasingly challenging on how to efficiently manage various workflows, virtual machines (VMs) and workflow execution on VM instances. To make the system scalable and easy-to-extend, we design a Workflow as a Service (WFaaS) architecture with independent services. A core part of the architecture is how to efficiently respond continuous workflow requests from users and schedule their executions in the cloud. Based on different targets, we propose four heuristic workflow scheduling algorithms for the WFaaS architecture, and analyze the differences and best usages of the algorithms in terms of performance, cost and the price/performance ratio via experimental studies.

  5. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  6. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  7. Lead isotope ratios in artists' lead white: a progress report

    International Nuclear Information System (INIS)

    Keisch, B.; Callahan, R.C.

    1976-01-01

    The lead isotope ratios in over four hundred samples of lead white have been determined. The samples represent various geographical sources and dates from the thirteenth century to the present. A new method for organizing this large volume of data is described which helps with the visualization of temporal and geographic patterns. A number of interesting relationships between lead isotope ratio and date or source are shown to exist. Some examples of successful applications of this methodology are described. (author)

  8. HSX progress report

    International Nuclear Information System (INIS)

    1994-01-01

    Brief statements on the progress of the design and construction of the HSX experiment are reported. Topics covered include the modular and auxiliary coil systems, the coil support structure, vacuum vessel, the ECH system, the magnet power supply and site. The proposed budget for Year 2 (August 1, 1994 through July 31, 1995) is presented. The effects of a flat funding profile (based on Year 2 budget level of $1137K) on out-years and the HSX project schedule are discussed. The stretching out of the program to accommodate the reduced funding profile should result in only a slight delay in HSX operations

  9. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  10. Optimal Residential Load Scheduling Under Utility and Rooftop Photovoltaic Units

    Directory of Open Access Journals (Sweden)

    Ghulam Hafeez

    2018-03-01

    Full Text Available With the rapid advancement in technology, electrical energy consumption is increasing rapidly. Especially, in the residential sector, more than 80% of electrical energy is being consumed because of consumer negligence. This brings the challenging task of maintaining the balance between the demand and supply of electric power. In this paper, we focus on the problem of load balancing via load scheduling under utility and rooftop photovoltaic (PV units to reduce electricity cost and peak to average ratio (PAR in demand-side management. For this purpose, we adopted genetic algorithm (GA, binary particle swarm optimization (BPSO, wind-driven optimization (WDO, and our proposed genetic WDO (GWDO algorithm, which is a hybrid of GA and WDO, to schedule the household load. For energy cost estimation, combined real-time pricing (RTP and inclined block rate (IBR were used. The proposed algorithm shifts load from peak consumption hours to off-peak hours based on combined pricing scheme and generation from rooftop PV units. Simulation results validate our proposed GWDO algorithm in terms of electricity cost and PAR reduction while considering all three scenarios which we have considered in this work: (1 load scheduling without renewable energy sources (RESs and energy storage system (ESS, (2 load scheduling with RESs, and (3 load scheduling with RESs and ESS. Furthermore, our proposed scheme reduced electricity cost and PAR by 22.5% and 29.1% in scenario 1, 47.7% and 30% in scenario 2, and 49.2% and 35.4% in scenario 3, respectively, as compared to unscheduled electricity consumption.

  11. Construction Progress Control (CPC) application for smartphones

    OpenAIRE

    Garcia Garcia, Jordi Carles

    2011-01-01

    Construction inspectors usually use notebooks or laptops to take notes on the construction site about how the tasks are progressing and any other relevant information. Later, when they are in the office they format this information and send it to the scheduler. This way of working wastes time and resources and could be optimized with a new technology already on the market: smartphones.

  12. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  13. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  14. The influence of "preparedness" on autoshaping, schedule performance, and choice.

    Science.gov (United States)

    Burns, J D; Malone, J C

    1992-11-01

    Two groups of experimentally naive pigeons were exposed to an autoshaping procedure in which the response key was mounted on the wall (the conventional location) or on the floor of the chamber. In two experiments, subjects readily responded to the wall key, but floor-key subjects required shaping. A subsequent experiment compared performance of wall- and floor-key groups on an ascending series of fixed-ratio schedule values, resistance to extinction, differential reinforcement of other behavior, and reversal of key assignment. Each experiment was followed by several sessions of fixed-ratio training; the performance of the wall- and floor-key groups was almost identical throughout. In the final experiment, a fixed-ratio requirement could be completed on either or both keys. Birds initially chose the key on which they had responded during the preceding (reversal of key assignment) experiment. However, within a few sessions both groups showed almost exclusive preference for the floor key. Preference for a key located on the floor may follow from the fact that pigeons are ground feeders and may thus be more "prepared" to peck the floor than to peck a wall. However, autoshaping, under the conditions prevailing here, occurred much more readily to the wall key, suggesting that pecking a vertical surface is more highly prepared. Difficulties in determining relative preparedness seem moot, however, given the lack of between-group differences in the intervening experiments. It is thus unlikely that schedule performances critically depend upon the specific operant response involved.

  15. Developing a new method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In this research, a new method is developed for modifying over-allocated schedules in a multi-mode resource constrained project scheduling problems (MRCPSPs with positive cash flows (MRCPSP-PCF. The aim is to maximize profit of the MRCPSPs or logically minimizing costs. The proposed method can be used as a macro in Microsoft Office Project® Software to modify resource over-allocated days after scheduling a project. This research considers progress payment method and preemptive resources. The proposed approach maximizes profit by scheduling activities through the resource calendar respecting to the available level of preemptive resources and activity numbers. To examine the performance of the proposed method a number of experiments derived from the literature are solved. The results are then compared with the circumstances where resource constraints are relaxed. The outcomes show that in all studied cases, the proposed algorithm can provide modified schedules with no over-allocated days. Afterward the method is applied to modify a manufacturing project in practice.

  16. Optimal RTP Based Power Scheduling for Residential Load in Smart Grid

    Science.gov (United States)

    Joshi, Hemant I.; Pandya, Vivek J.

    2015-12-01

    To match supply and demand, shifting of load from peak period to off-peak period is one of the effective solutions. Presently flat rate tariff is used in major part of the world. This type of tariff doesn't give incentives to the customers if they use electrical energy during off-peak period. If real time pricing (RTP) tariff is used, consumers can be encouraged to use energy during off-peak period. Due to advancement in information and communication technology, two-way communications is possible between consumers and utility. To implement this technique in smart grid, home energy controller (HEC), smart meters, home area network (HAN) and communication link between consumers and utility are required. HEC interacts automatically by running an algorithm to find optimal energy consumption schedule for each consumer. However, all the consumers are not allowed to shift their load simultaneously during off-peak period to avoid rebound peak condition. Peak to average ratio (PAR) is considered while carrying out minimization problem. Linear programming problem (LPP) method is used for minimization. The simulation results of this work show the effectiveness of the minimization method adopted. The hardware work is in progress and the program based on the method described here will be made to solve real problem.

  17. Cocaine tolerance: acute versus chronic effects as dependent upon fixed-ratio size.

    OpenAIRE

    Hoffman, S H; Branch, M N; Sizemore, G M

    1987-01-01

    The effects of cocaine on operant behavior were studied by examining fixed-ratio value as a factor in the development of tolerance. Pigeons pecked a response key under a three-component multiple schedule, with each bird being exposed to fixed-ratio values that were categorized as small, medium, or large. Administered acutely, cocaine (1.0 to 10.0 mg/kg) produced dose-related decreases in overall rate of responding. Responding maintained by the largest ratio was decreased by lower doses than t...

  18. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  19. The effect of ratio and interval training on Pavlovian-instrumental transfer in mice.

    Directory of Open Access Journals (Sweden)

    Brian J Wiltgen

    Full Text Available Conditional stimuli (CS that are paired with reward can be used to motivate instrumental responses. This process is called Pavlovian-instrumental transfer (PIT. A recent study in rats suggested that habitual responses are particularly sensitive to the motivational effects of reward cues. The current experiments examined this idea using ratio and interval training in mice. Two groups of animals were trained to lever press for food pellets that were delivered on random ratio or random interval schedules. Devaluation tests revealed that interval training led to habitual responding while ratio training produced goal-directed actions. The presentation of CSs paired with reward led to positive transfer in both groups, however, the size of this effect was much larger in mice that were trained on interval schedules. This result suggests that habitual responses are more sensitive to the motivational influence of reward cues than goal-directed actions. The implications for neurobiological models of motivation and drug seeking behaviors are discussed.

  20. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  2. Exploring a QoS Driven Scheduling Approach for Peer-to-Peer Live Streaming Systems with Network Coding

    Science.gov (United States)

    Cui, Laizhong; Lu, Nan; Chen, Fu

    2014-01-01

    Most large-scale peer-to-peer (P2P) live streaming systems use mesh to organize peers and leverage pull scheduling to transmit packets for providing robustness in dynamic environment. The pull scheduling brings large packet delay. Network coding makes the push scheduling feasible in mesh P2P live streaming and improves the efficiency. However, it may also introduce some extra delays and coding computational overhead. To improve the packet delay, streaming quality, and coding overhead, in this paper are as follows. we propose a QoS driven push scheduling approach. The main contributions of this paper are: (i) We introduce a new network coding method to increase the content diversity and reduce the complexity of scheduling; (ii) we formulate the push scheduling as an optimization problem and transform it to a min-cost flow problem for solving it in polynomial time; (iii) we propose a push scheduling algorithm to reduce the coding overhead and do extensive experiments to validate the effectiveness of our approach. Compared with previous approaches, the simulation results demonstrate that packet delay, continuity index, and coding ratio of our system can be significantly improved, especially in dynamic environments. PMID:25114968

  3. Progressive Taxes and Firm Births

    OpenAIRE

    Hans Ulrich Bacher; Marius Brülhart

    2013-01-01

    Tax reform proposals in the spirit of the 'flat tax' model typically aim to reduce three parameters: the average tax burden, the progressivity of the tax schedule, and the complexity of the tax code. We explore the implications of changes in these three parameters on entrepreneurial activity, measured by counts of firm births. The Swiss fiscal system offers sufficient intra-national variation in tax codes to allow us to estimate these effects with considerable precision. We find that high ave...

  4. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  5. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  6. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  7. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    Science.gov (United States)

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  8. Opportunistic Nonorthogonal Packet Scheduling in Fixed Broadband Wireless Access Networks

    Directory of Open Access Journals (Sweden)

    Ahmed Mohamed H

    2006-01-01

    Full Text Available In order to mitigate high cochannel interference resulting from dense channel reuse, the interference management issues are often considered as essential part of scheduling schemes in fixed broadband wireless access (FBWA networks. To that end, a series of literature has been published recently, in which a group of base stations forms an interferer group (downlink transmissions from each base station become dominant interference for the users in other in-group base stations, and the scheduling scheme deployed in the group allows only one base station to transmit at a time. As a result of time orthogonality in transmissions, the dominant cochannel interferers are prevented, and hence the packet error rate can be improved. However, prohibiting concurrent transmissions in these orthogonal schemes introduces throughput penalty as well as higher end-to-end packet delay which might not be desirable for real-time services. In this paper, we utilize opportunistic nonorthogonality among the in-group transmissions whenever possible and propose a novel transmission scheduling scheme for FBWA networks. The proposed scheme, in contrast to the proactive interference avoidance techniques, strives for the improvements in delay and throughput efficiency. To facilitate opportunistic nonorthogonal transmissions in the interferer group, estimation of signal-to-interference-plus-noise ratio (SINR is required at the scheduler. We have observed from simulations that the proposed scheme outperforms the reference orthogonal scheme in terms of spectral efficiency, mean packet delay, and packet dropping rate.

  9. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  10. National Research Council Dialogue to Assess Progress on NASA's Advanced Modeling, Simulation and Analysis Capability and Systems Engineering Capability Roadmap Development

    Science.gov (United States)

    Aikins, Jan

    2005-01-01

    Contents include the following: General Background and Introduction of Capability Roadmaps. Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  11. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  12. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  13. Status of the RERTR program: overview, progress and plans

    International Nuclear Information System (INIS)

    Travelli, A.

    1985-01-01

    The status of the US Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a summary of the accomplishments which the RERTR Program had achieved by the end of 1984 with its many international partners, emphasis is placed on the progress achieved during 1985 and on current plans and schedules. A new miniplate series, concentrating on U 3 Si 2 -Al and U 3 Si-Al fuels, was fabricated and is well into irradiation. The whole-core ORR demonstration is scheduled to begin in November 1985, with U 3 Si 2 -Al fuel at 4.8 g U/cm 3 . Altogether, 921 full-size test and prototype elements have been ordered for fabrication with reduced enrichment and the new technologies. Qualification of U 3 Si-Al fuel with approx.7 g U/cm 3 is still projected for 1989. This progress could not have been achieved without the close international cooperation which has existed since the beginning, and whose continuation and intensification will be essential to the achievement of the long-term RERTR goals

  14. Two-user opportunistic scheduling using hierarchical modulations in wireless networks with heterogenous average link gains

    KAUST Repository

    Hossain, Md Jahangir

    2010-03-01

    Our contribution, in this paper, is two-fold. First, we analyze the performance of a hierarchical modulation-assisted two-best user opportunistic scheduling (TBS) scheme, which was proposed by the authors, in a fading environment where different users have different average link gains. Specifically, we present a new expression for the spectral efficiency (SE) of the users and using this expression, we compare the degrees of fairness (DOF) of the TBS scheme with that of classical single user opportunistic scheduling schemes, namely, absolute carrier-to-noise ratio (CNR) based single-best user scheduling (SBS) and normalized CNR based proportional fair scheduling (PFS) schemes. The second contribution is that we propose a new hybrid two-user opportunistic scheduling (HTS) scheme based on our earlier proposed TBS scheme. This HTS scheme selects the first user based on the largest absolute CNR value among all the users while the second user is selected based on the ratios of the absolute CNRs to the corresponding average CNRs of the remaining users. The total transmission rate i.e., the constellation size is selected according to the absolute CNR of the first best user. The total transmission rate is then allocated among these selected users by joint consideration of their absolute CNRs and allocated number of information bit(s) are transmitted to them using hierarchical modulations. Numerical results are presented for a fading environment where different users experience independent but non-identical (i.n.d.) channel fading. These selected numerical results show that the proposed HTS scheme can considerably increase the system\\'s fairness without any degradation of the link spectral efficiency (LSE) i.e., the multiuser diversity gain compared to the classical SBS scheme. These results also show that the proposed HTS scheme has a lower fairness in comparison to the PFS scheme which suffers from a considerable degradation in LSE. © 2010 IEEE.

  15. Characteristic detected on computed tomography angiography predict coronary artery plaque progression in non-culprit lesions

    Energy Technology Data Exchange (ETDEWEB)

    Tan, Ya Hang; Zhou, Jia Zhou; Zhou, Ying; Yang, Xiaobo; Yang, Jun Jie; Chen, Yun Dai [Dept. of Cardiology, Chinese PLA General Hospital, Beijing (China)

    2017-06-15

    This study sought to determine whether variables detected on coronary computed tomography angiography (CCTA) would predict plaque progression in non-culprit lesions (NCL). In this single-center trial, we analyzed 103 consecutive patients who were undergoing CCTA and percutaneous coronary intervention (PCI) for culprit lesions. Follow-up CCTA was scheduled 12 months after the PCI, and all patients were followed for 3 years after their second CCTA examination. High-risk plaque features and epicardial adipose tissue (EAT) volume were assessed by CCTA. Each NCL stenosis grade was compared visually between two CCTA scans to detect plaque progression, and patients were stratified into two groups based on this. Logistic regression analysis was used to evaluate the factors that were independently associated with plaque progression in NCLs. Time-to-event curves were compared using the log-rank statistic. Overall, 34 of 103 patients exhibited NCL plaque progression (33%). Logistic regression analyses showed that the NCL progression was associated with a history of ST-elevated myocardial infarction (odds ratio [OR] = 5.855, 95% confidence interval [CI] = 1.391–24.635, p = 0.016), follow-up low-density lipoprotein cholesterol level (OR = 6.832, 95% CI = 2.103–22.200, p = 0.001), baseline low-attenuation plaque (OR = 7.311, 95% CI = 1.242–43.028, p = 0.028) and EAT (OR = 1.015, 95% CI = 1.000–1.029, p = 0.044). Following the second CCTA examination, major adverse cardiac events (MACEs) were observed in 12 patients, and NCL plaque progression was significantly associated with future MACEs (log rank p = 0.006). Noninvasive assessment of NCLs by CCTA has potential prognostic value.

  16. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  17. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  18. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  19. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    Science.gov (United States)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  20. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  1. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  2. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  3. Maryland University sectored isochronous cyclotron (MUSIC): Progress report No. 14

    Energy Technology Data Exchange (ETDEWEB)

    1967-01-10

    The past quarter has seen further progress in the solution of the problem of achieving a cyclotron which meets or exceeds the performance requirements. The magnet system, with the exception of the trim coils and their supplies, is all on order or about to be ordered, and a high confidence level exists that the system will meet all requirements. The rf system studies, nearly complete, have indicated that the solution chosen will meet the frequency requirements and will be within the power expected. The center studies, complete in the first phase, have resulted in a preliminary center design of the electrostatic focusing system and a design of the magnetic center which provides the required axial focusing. A high degree of cooperation on the center study programs between the U of M and CSF has efficiently yielded these results. The overall schedule continues to be maintained, and the program is expected to be completed on the 37-month schedule. For better control and greater visibility on schedule progress, two reference points have been selected as more immediate objectives. These are 17 July 1967 for the start of the magnet testing program and 2 October 1967 as the start of the rf high power tests. Each task involved is being analyzed with these dates in mind, and they appear to be reasonable.

  4. Tibiofemoral subchondral surface ratio (SSR) is a predictor of osteoarthritis symptoms and radiographic progression: data from the Osteoarthritis Initiative (OAI).

    Science.gov (United States)

    Everhart, J S; Siston, R A; Flanigan, D C

    2014-06-01

    Symptomatic knee osteoarthritis (OA) is poorly correlated with radiographic severity, but subchondral bone measures may be useful for risk assessment as bone shape is grossly unaffected at early radiographic stages. We sought to determine whether compartment-specific size mismatch in the naturally asymmetric tibiofemoral joint, measured as tibiofemoral subchondral surface ratio (SSR): (1) predicts incident symptoms, (2) predicts incident or progressive OA, (3) is reproducible and time invariant. OA Initiative participants with baseline MRIs and up to 48-month follow-up (n = 1,338) were analyzed. Logistic regression was used to determine the association between SSR and incident symptoms, incident OA, and progression of OA after adjusting for demographic, radiologic, injury-related, and lifestyle-related factors. Reproducibility was assessed as % coefficient of variation (CV) on repeat MRI studies at baseline and 24 months. Increased medial SSR is protective against incident symptoms at 48 months (per 0.1 increase: OR 0.48 CI 0.30, 0.75; P = 0.001). Increased lateral SSR values are protective against lateral OA incidence (OR 0.23 CI 0.06, 0.77; P = 0.016) or progression (OR 0.66 CI 0.43, 0.99; P = 0.049) at 24 months. Both medial and lateral SSR are stable over time (medial: mean change 0.001 SD 0.016; lateral: mean change 0.000 SD 0.017) and are highly reproducible (3.0% CV medial SSR; 2.7% CV lateral SSR). A larger medial SSR is protective against developing OA-related symptoms. A larger lateral SSR is protective against lateral OA incidence or progression. Finally, lateral and medial SSR are stable over time and are highly reproducible across MRI studies. Copyright © 2014 Osteoarthritis Research Society International. Published by Elsevier Ltd. All rights reserved.

  5. Two-user opportunistic scheduling using hierarchical modulations in wireless networks with heterogenous average link gains

    KAUST Repository

    Hossain, Md Jahangir; Alouini, Mohamed-Slim; Bhargava, Vijay K.

    2010-01-01

    -user opportunistic scheduling (HTS) scheme based on our earlier proposed TBS scheme. This HTS scheme selects the first user based on the largest absolute CNR value among all the users while the second user is selected based on the ratios of the absolute CNRs

  6. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  7. Scheduling Accessory Assists Patients with Cognitive Disorders

    Science.gov (United States)

    2007-01-01

    Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

  8. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  9. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  10. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  11. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  12. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  13. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  14. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  15. HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

    Science.gov (United States)

    Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.

    2012-01-01

    HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

  16. The status of the RERTR Program: Overview, progress and plans

    International Nuclear Information System (INIS)

    Travelli, A.

    1985-01-01

    The status of the U.S. Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a summary of the accomplishments which the RERTR Program had achieved by the end of 1984 with its many international partners, emphasis is placed on the progress achieved during 1985 and on current plans and schedules. A new miniplate series, concentrating on U 3 Si 2 -AI and U 3 Si-AI fuels, was fabricated and is well into irradiation. The whole-core ORR demonstration is scheduled to begin in November 1985, with U 3 Si 2 -AI fuel at 4.8 g U/cm 3 . Altogether, 921 full-size test and prototype elements have been ordered for fabrication with reduced enrichment and the new technologies. Qualification of U 3 Si-AI fuel with ∼7 g U/cm 3 is still projected for 1989. This progress could not have been achieved without the close international cooperation which has existed since the beginning, and whose continuation and intensification will be essential to the achievement of the long-term RERTR goals. (author)

  17. Integrated Fractional Load and Packet Scheduling for OFDMA Systems

    DEFF Research Database (Denmark)

    Monghal, Guillaume Damien; Kumar, S.; Pedersen, Klaus I.

    2009-01-01

    This paper study the performance of an orthogonal frequency division multiple access (OFDMA) system under fractional load based in long term evolution (LTE) downlink. Fractional load is defined by a situation where only a fraction of the bandwidth is used for transmission due to lack of traffic....... This type of situation should result in a global increase of signal to interference and noise ratio (SINR) conditions in the network. We propose different methods integrating the transmission pattern selection to the packet scheduling functionality of the enode-B depending only on the channel quality...

  18. Pulsed dose rate and fractionated high dose rate brachytherapy: choice of brachytherapy schedules to replace low dose rate treatments

    International Nuclear Information System (INIS)

    Visser, Andries G.; Aardweg, Gerard J.M.J. van den; Levendag, Peter C.

    1996-01-01

    Purpose: Pulsed dose rate (PDR) brachytherapy is a new type of afterloading brachytherapy (BT) in which a continuous low dose rate (LDR) treatment is simulated by a series of 'pulses,' i.e., fractions of short duration (less than 0.5 h) with intervals between fractions of 1 to a few hours. At the Dr. Daniel den Hoed Cancer Center, the term 'PDR brachytherapy' is used for treatment schedules with a large number of fractions (at least four per day), while the term 'fractionated high dose rate (HDR) brachytherapy' is used for treatment schedules with just one or two brachytherapy fractions per day. Both treatments can be applied as alternatives for LDR BT. This article deals with the choice between PDR and fractionated HDR schedules and proposes possible fractionation schedules. Methods and Materials: To calculate HDR and PDR fractionation schedules with the intention of being equivalent to LDR BT, the linear-quadratic (LQ) model has been used in an incomplete repair formulation as given by Brenner and Hall, and by Thames. In contrast to earlier applications of this model, both the total physical dose and the overall time were not kept identical for LDR and HDR/PDR schedules. A range of possible PDR treatment schedules is presented, both for booster applications (in combination with external radiotherapy (ERT) and for BT applications as a single treatment. Because the knowledge of both α/β values and the half time for repair of sublethal damage (T (1(2)) ), which are required for these calculations, is quite limited, calculations regarding the equivalence of LDR and PDR treatments have been performed for a wide range of values of α/β and T (1(2)) . The results are presented graphically as PDR/LDR dose ratios and as ratios of the PDR/LDR tumor control probabilities. Results: If the condition that total physical dose and overall time of a PDR treatment must be exactly identical to the values for the corresponding LDR treatment regimen is not applied, there appears

  19. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  20. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  1. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  2. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  3. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  4. Comparison of job stress and obesity in nurses with favorable and unfavorable work schedules.

    Science.gov (United States)

    Han, Kihye; Trinkoff, Alison M; Storr, Carla L; Geiger-Brown, Jeanne; Johnson, Karen L; Park, Sungae

    2012-08-01

    To compare obesity-related factors between female nurses with favorable work schedules (WSs) and unfavorable WSs. In a cross-sectional study, 1724 female nurses were stratified by WS (favorable vs unfavorable). For each schedule type, the odds of obesity were related to health behaviors, home demands, and job stress using logistic regression models. Among nurses with unfavorable WSs, healthy behaviors (exercise, sleep) were inversely associated with obesity, whereas for those with favorable WSs, obese nurses reported significantly more unhealthy behaviors (smoking, alcohol use; odds ratio [OR], 1.19; 95% confidence interval [CI], 1.02-1.38), more physical lifting of children/dependents (OR, 1.43; 95% CI, 1.06-1.93), having more nurse input into their jobs (OR, 1.21; 95% CI, 1.02-1.44), yet less boss support at work (OR, 0.83; 95% CI, 0.68-0.99). Considering impacts of WSs on obesity and potential obesity-related health outcomes, healthful scheduling should be provided to nurses.

  5. The replacement research reactor description and progress report

    International Nuclear Information System (INIS)

    Abbate, P.; Ordonez, J.P.

    2003-01-01

    A contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000 between Australia authorities and INVAP from Argentina. Since then the detailed design has been completed, an application for a construction license was made in May 2001 and granted in April 2002. The construction and manufacturing phase is presently underway, with full operation of the facility being scheduled for 2006. This paper explains the safety philosophy embedded into the design together with the approach taken for main elements of the design and their relation to the proposed applications of the reactor. Also information is provided on the suit of neutron beam facilities and irradiation facilities being constructed. Finally it is presented an outline of the project management organisation, project planing, schedule, licensing and general project progress

  6. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  7. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  8. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  9. Design and development of a continuously variable ratio transmission for an automotive vehicle. Phase IV. Quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-31

    Progress in the design and development of a continuously variable ratio transmission for an automotive vehicle is reported. The Major automotive hydromechanical transmission development problem continues to be the reduction of hydrostatic noise and the project plan, therefore, concentrated on the new hydrostatic module. The potential for achieving acceptably low noise levels in the second generation hydromechanical transmission is to be assessed by comparing the noise levels of the hydrostatic modules for the first and second generation transmissions. A set of twelve test points was selected comprising of road load steady state and wide-open-throttle acceleration at 10, 20, 30, 40, 50 and 60 mph. The module operating conditions for the two transmissions at each of these twelve points were calculated. Baseline noise data was measured on the first generation module. The results are given testing of co-axial hydrostatic module for second generation hydromechanical transmission will be emphasized. (LCL)

  10. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  11. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  12. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  13. Sleep/wake scheduling scheme for minimizing end-to-end delay in multi-hop wireless sensor networks

    Directory of Open Access Journals (Sweden)

    Madani Sajjad

    2011-01-01

    Full Text Available Abstract We present a sleep/wake schedule protocol for minimizing end-to-end delay for event driven multi-hop wireless sensor networks. In contrast to generic sleep/wake scheduling schemes, our proposed algorithm performs scheduling that is dependent on traffic loads. Nodes adapt their sleep/wake schedule based on traffic loads in response to three important factors, (a the distance of the node from the sink node, (b the importance of the node's location from connectivity's perspective, and (c if the node is in the proximity where an event occurs. Using these heuristics, the proposed scheme reduces end-to-end delay and maximizes the throughput by minimizing the congestion at nodes having heavy traffic load. Simulations are carried out to evaluate the performance of the proposed protocol, by comparing its performance with S-MAC and Anycast protocols. Simulation results demonstrate that the proposed protocol has significantly reduced the end-to-end delay, as well as has improved the other QoS parameters, like average energy per packet, average delay, packet loss ratio, throughput, and coverage lifetime.

  14. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  15. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  16. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  17. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  18. Dose response of rat retinal microvessels to proton dose schedules used clinically: a pilot study

    International Nuclear Information System (INIS)

    Archambeau, John O.; Mao, Xiao W.; McMillan, Paul J.; Gouloumet, Vanessa L.; Oeinck, Steven C.; Grove, Roger; Yonemoto, Leslie T.; Slater, Jerry D.; Slater, James M.

    2000-01-01

    Purpose: This preclinical rat pilot study quantifies retinal microvessel, endothelial, and pericyte population changes produced by proton irradiation Methods and Materials: The left eyes of rats were irradiated with single doses of 8, 14, 20, and 28 Gy protons; right eyes, with two fractions. Animals were euthanized, and eyes were removed; elastase digests were prepared, and cell populations were counted in sample fields. Results were compared with unirradiated controls. Results: Progressive time- and dose-dependent endothelial cell loss occurred following all schedules. Cell loss was significantly different from control values (p 0 phase of the mitotic cycle. 28 Gy produced photoreceptor cell loss. Conclusion: The retinal digest is an elegant bioassay to quantify the microvessel population response. Single- and split-dose schedules appear to yield similar outcomes, in terms of endothelial cell density

  19. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  20. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  1. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem

    Science.gov (United States)

    Tang, Dunbing; Dai, Min

    2015-09-01

    The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production planning and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed smalland large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.

  2. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  3. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  4. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  5. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  6. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  7. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  8. Channel access delay and buffer distribution of two-user opportunistic scheduling schemes in wireless networks

    KAUST Repository

    Hossain, Md Jahangir

    2010-07-01

    In our earlier works, we proposed rate adaptive hierarchical modulation-assisted two-best user opportunistic scheduling (TBS) and hybrid two-user scheduling (HTS) schemes. The proposed schemes are innovative in the sense that they include a second user in the transmission opportunistically using hierarchical modulations. As such the frequency of information access of the users increases without any degradation of the system spectral efficiency (SSE) compared to the classical opportunistic scheduling scheme. In this paper, we analyze channel access delay of an incoming packet at the base station (BS) buffer when our proposed TBS and HTS schemes are employed at the BS. Specifically, using a queuing analytic model we derive channel access delay as well as buffer distribution of the packets that wait at BS buffer for down-link (DL) transmission. We compare performance of the TBS and HTS schemes with that of the classical single user opportunistic schemes namely, absolute carrier-to-noise ratio (CNR)-based single user scheduling (ASS) and normalized CNR-based single user scheduling (NSS). For an independent and identically distributed (i.i.d.) fading environment, our proposed scheme can improve packet\\'s access delay performance compared to the ASS. Selected numerical results in an independent but non-identically distributed (i.n.d.) fading environment show that our proposed HTS achieves overall good channel access delay performance. © 2010 IEEE.

  9. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  10. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  11. HT-7U superconducting tokamak: Physics design, engineering progress and schedule

    International Nuclear Information System (INIS)

    Wan Yuanxi

    2002-01-01

    The superconducting tokamak research program begun in China in ASIPP since 1994. The program is included in existent superconducting tokamak HT-7 and the next new superconducting tokamak HT-7U which is one of national key research projects in China. With the elongation cross-section, divertor and higher plasma parameter the main objectives of HT-7U are widely investigation both of the physics and technology for steady state advanced tokamak as well as the investigation of power and particle handle under steady-state operation condition. The physics and engineering design have been completed and significant progresses on R and D and fabrication have been achieved. HT-7U will begin assembly at 2003 and possible to get first plasma around 2004. (author)

  12. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  15. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  16. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  17. Progressivity of personal income tax in Croatia: decomposition of tax base and rate effects

    Directory of Open Access Journals (Sweden)

    Ivica Urban

    2006-09-01

    Full Text Available This paper presents progressivity breakdowns for Croatian personal income tax (henceforth PIT in 1997 and 2004. The decompositions reveal how the elements of the system – tax schedule, allowances, deductions and credits – contribute to the achievement of progressivity, over the quantiles of pre-tax income distribution. Through the use of ‘single parameter’ Gini indices, the social decision maker’s (henceforth SDM relatively more or less favorable inclination toward taxpayers in the lower tails of pre-tax income distribution is accounted for. Simulations are undertaken to show how the introduction of a flat-rate system would affect progressivity.

  18. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  19. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  20. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  1. Collaborative Event-Driven Coverage and Rate Allocation for Event Miss-Ratio Assurances in Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Ozgur Sanli H

    2010-01-01

    Full Text Available Wireless sensor networks are often required to provide event miss-ratio assurance for a given event type. To meet such assurances along with minimum energy consumption, this paper shows how a node's activation and rate assignment is dependent on its distance to event sources, and proposes a practical coverage and rate allocation (CORA protocol to exploit this dependency in realistic environments. Both uniform event distribution and nonuniform event distribution are considered and the notion of ideal correlation distance around a clusterhead is introduced for on-duty node selection. In correlation distance guided CORA, rate assignment assists coverage scheduling by determining which nodes should be activated for minimizing data redundancy in transmission. Coverage scheduling assists rate assignment by controlling the amount of overlap among sensing regions of neighboring nodes, thereby providing sufficient data correlation for rate assignment. Extensive simulation results show that CORA meets the required event miss-ratios in realistic environments. CORA's joint coverage scheduling and rate allocation reduce the total energy expenditure by 85%, average battery energy consumption by 25%, and the overhead of source coding up to 90% as compared to existing rate allocation techniques.

  2. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  3. Prescriptions for schedule II opioids and benzodiazepines increase after the introduction of computer-generated prescriptions.

    Science.gov (United States)

    McGerald, Genevieve; Dvorkin, Ronald; Levy, David; Lovell-Rose, Stephanie; Sharma, Adhi

    2009-06-01

    Prescriptions for controlled substances decrease when regulatory barriers are put in place. The converse has not been studied. The objective was to determine whether a less complicated prescription writing process is associated with a change in the prescribing patterns of controlled substances in the emergency department (ED). The authors conducted a retrospective nonconcurrent cohort study of all patients seen in an adult ED between April 19, 2005, and April 18, 2007, who were discharged with a prescription. Prior to April 19, 2006, a specialized prescription form stored in a locked cabinet was obtained from the nursing staff to write a prescription for benzodiazepines or Schedule II opioids. After April 19, 2006, New York State mandated that all prescriptions, regardless of schedule classification, be generated on a specialized bar-coded prescription form. The main outcome of the study was to compare the proportion of Schedule III-V opioids to Schedule II opioids and benzodiazepines prescribed in the ED before and after the introduction of a less cumbersome prescription writing process. Of the 26,638 charts reviewed, 2.1% of the total number of prescriptions generated were for a Schedule II controlled opioid before the new system was implemented compared to 13.6% after (odds ratio [OR] = 7.3, 95% confidence interval [CI] = 6.4 to 8.4). The corresponding percentages for Schedule III-V opioids were 29.9% to 18.1% (OR = 0.52, 95% CI = 0.49 to 0.55) and for benzodiazepines 1.4% to 3.9% (OR = 2.8, 95% CI = 2.4 to 3.4). Patients were more likely to receive a prescription for a Schedule II opioid or a benzodiazepine after a more streamlined computer-generated prescription writing process was introduced in this ED. (c) 2009 by the Society for Academic Emergency Medicine.

  4. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  5. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  6. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  7. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  8. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  9. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  10. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  11. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  12. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  13. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  14. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  15. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  16. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  17. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  18. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  19. Public Expenditure and Scheduled Community Enrolment in Higher Education: A Comparison across Indian States

    Science.gov (United States)

    Sumithra, S.; Vardhan, R. Vishnu; Aruna, C.

    2014-01-01

    In India, the gross enrolment ratio has increased from 13.1 per cent in 2007-2008 to 15 per cent in 2011-2012 which moves the country from elite to a mass higher education system. This article seeks to examine the enrolment of scheduled caste (SC) students across various states in the country and the expenditure by each state and its effect on SC…

  20. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  1. Metaheuristics progress as real problem solvers

    CERN Document Server

    Nonobe, Koji; Yagiura, Mutsunori

    2005-01-01

    Metaheuristics: Progress as Real Problem Solvers is a peer-reviewed volume of eighteen current, cutting-edge papers by leading researchers in the field. Included are an invited paper by F. Glover and G. Kochenberger, which discusses the concept of Metaheuristic agent processes, and a tutorial paper by M.G.C. Resende and C.C. Ribeiro discussing GRASP with path-relinking. Other papers discuss problem-solving approaches to timetabling, automated planograms, elevators, space allocation, shift design, cutting stock, flexible shop scheduling, colorectal cancer and cartography. A final group of methodology papers clarify various aspects of Metaheuristics from the computational view point.

  2. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  3. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  4. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  5. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  6. The impact of sex ratio and economic status on local birth rates.

    Science.gov (United States)

    Chipman, A; Morrison, E

    2013-04-23

    Human mating and reproductive behaviour can vary depending on various mechanisms, including the local sex ratio. Previous research shows that as sex ratios become female-biased, women from economically deprived areas are less likely to delay reproductive opportunities to wait for a high-investing mate but instead begin their reproductive careers sooner. Here, we show that the local sex ratio also has an impact on female fertility schedules. At young ages, a female-biased ratio is associated with higher birth rates in the poorest areas, whereas the opposite is true for the richest areas. At older ages, a female-biased ratio is associated with higher birth rates in the richest, but not the poorest areas. These patterns suggest that female-female competition encourages poorer women to adopt a fast life-history strategy and give birth early, and richer women to adopt a slow life-history strategy and delay reproduction.

  7. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  8. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  9. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  10. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  11. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  12. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  13. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  14. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  15. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  16. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  17. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  18. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  19. Neutrophil Lymphocyte Ratio Predicts Postoperative Pain after ...

    African Journals Online (AJOL)

    Background and Aim: Postoperative pain is well known and usually disturbing complication of surgery. Inflammation plays an important role in the development and progression of postoperative pain. We aimed to investigate possible relationship between preoperatively measured neutrophil‑lymphocyte ratio (NLR) – as an ...

  20. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  1. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  2. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  3. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  4. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  5. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  6. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  7. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  8. LS1 Report: According to schedule

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    The AD’s BHN06 coils have been delivered back to CERN at long last from their repair at a Russian facility. The magnet will be reinstalled underneath the ATRAP experimental area, which has already been partially dismantled to make way for it.   Consolidation of the 7 PS main magnets continues as planned, with 4 magnets already removed from the beam line and delivered to the magnet workshop. A specialised team will be arriving in mid-November (also from Russia) to consolidate the magnets on the surface. The PS Booster’s beam dump replacement project remains ongoing, with the final survey of the beam transfer line currently underway. The SPS’s irradiated cable replacement campaign continues as planned; it will be completed by the end of March 2014. Over at the LHC, the Radiation to Electronics (R2E) campaign is progressing well. These activities are actually a few weeks ahead of schedule at Point 1, where teams have already begun commissioning relocated cryogenic equ...

  9. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  10. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  11. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  12. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  13. LIFE: Recent Developments and Progress

    International Nuclear Information System (INIS)

    Anklam, T.M.

    2011-01-01

    Test results from the NIF show excellent progress toward achieving ignition. Experiments designed to verify coupling of the laser energy to the fusion target have shown that the efficiency meets that needed for ignition. Several tests with the cryogenic targets needed for ignition have been performed, and world-record neutron output produced. The National Ignition Campaign is on schedule to meet its 2012 ignition milestone, with the next phase in the campaign due to start later this month. It has been a busy and very productive year. The NIF is in full 24/7 operations and has progressed markedly in the path toward ignition. The long-standing goal of the National Ignition Campaign to demonstrate ignition by the end of FY 2012 is on track. The LIFE plant design has matured considerably, and a delivery plan established based on close interactions with vendors. National-level reviews of fusion are underway, and are due to present initial findings later this year. A value proposition has been drafted for review. The LIFE project is ready to move into the delivery phase.

  14. Nuclear powered satellite studies. Annual progress report, July 1, 1977--June 30, 1978

    International Nuclear Information System (INIS)

    Kaplan, M.H.

    1978-06-01

    Progress achieved during the reporting period is reported. Discussions of several pertinent aspects are included, e.g., schedule, personnel, technology developments, and plans. The reporting period represents the second year of activities of a project which is designed to provide continuing support in the area of nuclear space power technology. Important results are summarized

  15. Exercise capacity and progression from prehypertension to hypertension.

    Science.gov (United States)

    Faselis, Charles; Doumas, Michael; Kokkinos, John Peter; Panagiotakos, Demosthenes; Kheirbek, Raya; Sheriff, Helen M; Hare, Katherine; Papademetriou, Vasilios; Fletcher, Ross; Kokkinos, Peter

    2012-08-01

    Prehypertension is likely to progress to hypertension. The rate of progression is determined mostly by age and resting blood pressure but may also be attenuated by increased fitness. A graded exercise test was performed in 2303 men with prehypertension at the Veterans Affairs Medical Centers in Washington, DC. Four fitness categories were defined, based on peak metabolic equivalents (METs) achieved. We assessed the association between exercise capacity and rate of progression to hypertension (HTN). The median follow-up period was 7.8 years (mean (± SD) 9.2±6.1 years). The incidence rate of progression from prehypertension to hypertension was 34.4 per 1000 person-years. Exercise capacity was a strong and independent predictor of the rate of progression. Compared to the High-Fit individuals (>10.0 METs), the adjusted risk for developing HTN was 66% higher (hazard ratio, 1.66; 95% CI, 1.2 to 2.2; P=0.001) for the Low-Fit and, similarly, 72% higher (hazard ratio, 1.72; 95% CI, 1.2 to 2.3; P=0.001) for the Least-Fit individuals, whereas it was only 36% for the Moderate-Fit (hazard ratio, 1.36; 95% CI, 0.99 to 1.80; P=0.056). Significant predictors for the progression to HTN were also age (19% per 10 years), resting systolic blood pressure (16% per 10 mm Hg), body mass index (15.3% per 5 U), and type 2 diabetes mellitus (2-fold). In conclusion, an inverse, S-shaped association was shown between exercise capacity and the rate of progression from prehypertension to hypertension in middle-aged and older male veterans. The protective effects of fitness were evident when exercise capacity exceeded 8.5 METs. These findings emphasize the importance of fitness in the prevention of hypertension.

  16. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  17. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  18. Shippingport Station Decommissioning Project (SSDP). A progress report

    International Nuclear Information System (INIS)

    Mullee, G.R.; Usher, J.M.

    1986-01-01

    The Shippingport Atomic Power Station was shutdown in October, 1982 by the Plant Operator, Duquesne Light Company, for decommissioning by the US Department of Energy. The planning for decommissioning was completed in September, 1983. In September, 1984 operational responsibility for the station was transferred to the DOE's Decommissioning Operations Contractor - the General Electric Company (assisted by an integrated subcontractor, MK Ferguson Company). Significant accomplishments to date include the completion of all prerequisites for decommissioning, the removal of asbestos from plant systems, loading of irradiated reactor components into the reactor vessel for shipment, the commencement of electrical deactivations and the commencement of piping/component removal. Decontamination and waste processing are progressing in support of the project schedule. The reactor vessel will be shipped as one piece on a barge for burial at Hanford, Washington. The final release of the site is scheduled for April, 1990. A technology transfer program is being utilized to disseminate information about the project

  19. The role of scheduled second TACE in early-stage hepatocellular carcinoma with complete response to initial TACE

    Directory of Open Access Journals (Sweden)

    Jung Hee Kim

    2017-03-01

    Full Text Available Background/Aims We investigated the outcomes of early-stage hepatocellular carcinoma (HCC patients who showed a complete response (CR to initial transarterial chemoembolization (TACE, with a focus on the role of scheduled TACE repetition. Methods A total of 178 patients with early-stage HCC who were initially treated with TACE and showed a CR based on the modified Response Evaluation Criteria in Solid Tumors (mRECIST criteria on one month follow-up computed tomography (CT were analyzed. Among them, 90 patients underwent scheduled repetition of TACE in the absence of viable tumor on CT. Results During a median follow-up period of 4.6 years (range: 0.4-8.8 years, mortality was observed in 71 patients (39.9%. The overall recurrence-free and local recurrence-free survival rates at 1 year were 44.4% and 56.2%. In the multivariable model, scheduled repetition of TACE was an independent factor associated with survival (hazard ratio [95% confidence interval]: 0.56 [0.34-0.93], P=0.025. When stratified using Barcelona clinic liver cancer (BCLC stage, scheduled repetition of TACE was associated with a favorable survival rate in BCLC stage A patients, but not in BCLC 0 patients. Conclusions Scheduled repetition of TACE was associated with better survival for early-stage HCC patients showing a CR after initial TACE, especially in BCLC stage A patients.

  20. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  1. The urine albumin-to-creatinine ratio is a reliable indicator for evaluating complications of chronic kidney disease and progression in IgA nephropathy in China

    Directory of Open Access Journals (Sweden)

    Lu Huan

    2016-05-01

    Full Text Available OBJECTIVE: This study investigated the correlation between the albumin-to-creatinine ratio in the urine and 24-hour urine proteinuria and whether the ratio can predict chronic kidney disease progression even more reliably than 24-hour proteinuria can, particularly in primary IgA nephropathy. METHODS: A total of 182 patients with primary IgA nephropathy were evaluated. Their mean urine albumin-to-creatinine ratio and 24-hour proteinuria were determined during hospitalization. Blood samples were also analyzed. Follow-up data were recorded for 44 patients. A cross-sectional study was then conducted to test the correlation between these parameters and their associations with chronic kidney disease complications. Subsequently, a canonical correlation analysis was employed to assess the correlation between baseline proteinuria and parameters of the Oxford classification. Finally, a prospective observational study was performed to evaluate the association between proteinuria and clinical outcomes. Our study is registered in the Chinese Clinical Trial Registry, and the registration number is ChiCTR-OCH-14005137. RESULTS: A strong correlation (r=0.81, p<0.001 was found between the ratio and 24-hour proteinuria except in chronic kidney disease stage 5. First-morning urine albumin-to-creatinine ratios of ≥125.15, 154.44 and 760.31 mg/g reliably predicted equivalent 24-hour proteinuria ‘thresholds’ of ≥0.15, 0.3 and 1.0 g/24 h, respectively. In continuous analyses, the albumin-to-creatinine ratio was significantly associated with anemia, acidosis, hypoalbuminemia, hyperphosphatemia, hyperkalemia, hypercholesterolemia and higher serum cystatin C. However, higher 24-hour proteinuria was only associated with hypoalbuminemia and hypercholesterolemia. Higher tubular atrophy and interstitial fibrosis scores were also associated with a greater albumin-to-creatinine ratio, as observed in the canonical correlation analysis. Finally, the albumin

  2. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  3. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  4. Centralized Routing and Scheduling Using Multi-Channel System Single Transceiver in 802.16d

    Science.gov (United States)

    Al-Hemyari, A.; Noordin, N. K.; Ng, Chee Kyun; Ismail, A.; Khatun, S.

    This paper proposes a cross-layer optimized strategy that reduces the effect of interferences from neighboring nodes within a mesh networks. This cross-layer design relies on the routing information in network layer and the scheduling table in medium access control (MAC) layer. A proposed routing algorithm in network layer is exploited to find the best route for all subscriber stations (SS). Also, a proposed centralized scheduling algorithm in MAC layer is exploited to assign a time slot for each possible node transmission. The cross-layer optimized strategy is using multi-channel single transceiver and single channel single transceiver systems for WiMAX mesh networks (WMNs). Each node in WMN has a transceiver that can be tuned to any available channel for eliminating the secondary interference. Among the considered parameters in the performance analysis are interference from the neighboring nodes, hop count to the base station (BS), number of children per node, slot reuse, load balancing, quality of services (QoS), and node identifier (ID). Results show that the proposed algorithms significantly improve the system performance in terms of length of scheduling, channel utilization ratio (CUR), system throughput, and average end to end transmission delay.

  5. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  6. Design studies of low-aspect ratio quasi-omnigenous stellarators

    International Nuclear Information System (INIS)

    Spong, D.A.; Hirshman, S.; Whitson, J.C.

    2001-01-01

    Significant progress has been made in the development of new modest-size compact stellarator devices that could test optimization principles for the design of a more attractive reactor. These are 3 and 4 field period low-aspect-ratio quasi-omnigenous (QO) stellarators based on an optimization method that targets improved confinement, stability, ease of coil design, low-aspect-ratio, and low bootstrap current. (author)

  7. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  8. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  9. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  10. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  11. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  12. Tools and techniques for schedule's controlling: tracking system and control of Urucu-Manaus gas-pipeline construction, stretch B1

    Energy Technology Data Exchange (ETDEWEB)

    Zuany, Valdenise Marques; Dias, Jose Luiz Gomes [CONCREMAT Engenharia e Tecnologia S/A, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The goal is to show the monitoring systems and deadline control, using the PMBOK{sup R} project management tools, in the Construction and Assembly of the Coari-Manaus Gas-pipeline, stretch B1, which includes the cities of Coari, Codajas, Anori and Anama, in the state of Amazon, in the Northern Undertaking Implementation (IENOR), an Engineering division of the PETROBRAS System. This report presents the practical effects of the usage of three schedule control tools of the project: Performance Measurement, using the technique of the Earned Value Management (EVM), which integrates cost, schedule and physical progress of the enterprise to determine the variations of schedule and performance; Project Management Software, MSProject, which allows schedule's elaboration and makes the tracking of the planned dates possible (baseline) in relation to real dates and forecasts the trend level, the effects of changes in the project's schedule, demonstrating its utility as a schedule control tool; and Schedule Variance Analysis, which adopts practical data to reach the pessimistic, most likely and optimistic expectations. The implantation of these tools was based in the Work Breakdown Structure of the enterprise. The application of these three tools in the tracking and control of the enterprise demonstrates that, the use of information and techniques deriving from the planning and control can be an important support for project management and decision taking, comparing the results gotten in the implantation of the plan with its actual realization, defining, thus, the necessary corrective actions, generating learned lessons to use in future projects. (author)

  13. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  14. Effects of 14-day treatment with the schedule III anorectic phendimetrazine on choice between cocaine and food in rhesus monkeys.

    Science.gov (United States)

    Banks, Matthew L; Blough, Bruce E; Negus, S Stevens

    2013-08-01

    The clinical utility of monoamine releasers such as phenmetrazine or d-amphetamine as candidate agonist medications for cocaine dependence is hindered by their high abuse liability. Phendimetrazine is a clinically available schedule III anorectic that functions as a prodrug for phenmetrazine and thus may have lower abuse liability. This study determined the effects of continuous 14-day treatment with phendimetrazine on cocaine vs. food choice in rhesus monkeys (N=4). Responding was maintained under a concurrent schedule of food delivery (1-g pellets, fixed-ratio 100 schedule) and cocaine injections (0-0.1mg/kg/injection, fixed-ratio 10 schedule). Cocaine choice dose-effect curves were determined daily before and during 14-day periods of continuous intravenous treatment with saline or (+)-phendimetrazine (0.32-1.0mg/kg/h). Effects of 14-day treatment with (+)-phenmetrazine (0.1-0.32 mg/kg/h; N=5) and d-amphetamine (0.032-0.1mg/kg/h; N=6) were also examined for comparison. During saline treatment, food was primarily chosen during availability of low cocaine doses (0, 0.0032, and 0.01 mg/kg/injection), and cocaine was primarily chosen during availability of higher cocaine doses (0.032 and 0.1mg/kg/injection). Phendimetrazine initially decreased overall responding without significantly altering cocaine choice. Over the course of 14 days, tolerance developed to rate decreasing effects, and phendimetrazine dose-dependently decreased cocaine choice (significant at 0.032 mg/kg/injection cocaine). Phenmetrazine and d-amphetamine produced qualitatively similar effects. These results demonstrate that phendimetrazine can produce significant, though modest, reductions in cocaine choice in rhesus monkeys. Phendimetrazine may be especially suitable as a candidate medication for human studies because of its schedule III clinical availability. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  15. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  16. Distinction between glioma progression and post-radiation change by combined physiologic MR imaging

    Energy Technology Data Exchange (ETDEWEB)

    Matsusue, Eiji [University of Washington, Department of Radiology, Seattle, WA (United States); Tottori University, Division of Radiology, Department of Pathophysiological and Therapeutic Science, Faculty of Medicine, Yonago, Tottori (Japan); Fink, James R.; Maravilla, Kenneth R. [University of Washington, Department of Radiology, Seattle, WA (United States); Rockhill, Jason K. [University of Washington, Department of Radiation Oncology, Seattle, WA (United States); Ogawa, Toshihide [Tottori University, Division of Radiology, Department of Pathophysiological and Therapeutic Science, Faculty of Medicine, Yonago, Tottori (Japan)

    2010-04-15

    Magnetic resonance (MR) diffusion-weighted imaging (DWI), dynamic susceptibility contrast-enhanced perfusion imaging (DSC), and MR spectroscopy (MRS) techniques provide specific physiologic information that may distinguish malignant glioma progression from post-radiation change, yet no single technique is completely reliable. We propose a simple, multiparametric scoring system to improve diagnostic accuracy beyond that of each technique alone. Fifteen subjects with lesions suspicious for glioma progression following radiation therapy who had also undergone 3-tesla DWI, DSC, and MRS studies of the lesion were retrospectively reviewed. Minimum apparent diffusion coefficient (ADC) ratio, maximum regional cerebral blood volume (rCBV) ratio, and maximum MRS choline/creatine (Cho/Cr) and choline/N-acetyl-aspartate (Cho/NAA) metabolic peak-height ratios were quantified within each lesion. Each parameter (ADC ratio, rCBV ratio, and combined Cho/Cr and Cho/NAA ratios) was scored as either glioma progression (one point) or radiation change (zero point) based upon thresholds derived from our own data. For each lesion, the combined parameters yielded a multiparametric score (0 to 3) for prediction of tumor progression or post-radiation change. Optimum thresholds for ADC ratio (1.30), rCBV ratio (2.10), and either combined Cho/Cr (1.29) and Cho/NAA (1.06) yielded diagnostic accuracies of 86.7%, 86.7%, and 84.6%, respectively (p < 0.05). A combined multiparametric score threshold of 2 improved diagnostic accuracy to 93.3% (p < 0.05). In this small series combining 3-T DWI, DSC, and MRS diagnostic results using a simple, multiparametric scoring system has potential to improve overall diagnostic accuracy in distinguishing glioma progression from post-radiation change beyond that of each technique alone. (orig.)

  17. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  18. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  19. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  20. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  1. Annual progress report 1988, operation of the high flux reactor

    International Nuclear Information System (INIS)

    1989-01-01

    In 1988 the High Flux Reactor Petten was routinely operated without any unforeseen event. The availability was 99% of scheduled operation. Utilization of the irradiation positions amounted to 80% of the practical occupation limit. The exploitation pattern comprised nuclear energy deployment, fundamental research with neutrons, and radioisotope production. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  2. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  3. A Preliminary Analysis of Adaptive Responding Under Open and Closed Economies

    Science.gov (United States)

    Roane, Henry S.; Call, Nathan A.; Falcomata, Terry S.

    2005-01-01

    In the current investigation, we evaluated the effects of open and closed economies on the adaptive behavior of 2 individuals with developmental disabilities. Across both types of economy, progressive-ratio (PR) schedules were used in which the number of responses required to obtain reinforcement increased as the session progressed. In…

  4. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Field Office (DOE-OR), the US Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section 9 and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review or approval. The initial issue of this document in March 1992 transmitted to EPA/TDEC those plans and schedules that were required within 60 to 90 days of the FFA effective date. The current revision of this document updates the plans, schedules, and strategy for achieving compliance with the FFA, and it summarizes the progress that has been made over the past year. Chapter 1 describes the history and operation of the ORNL LLLW System, the objectives of the FFA, the organization that has been established to bring the system into compliance, and the plans for achieving compliance. Chapters 2 through 7 of this report contain the updated plans and schedules for meeting FFA requirements. This document will continue to be periodically reassessed and refined to reflect newly developed information and progress

  5. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  6. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  7. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  8. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  9. Second harmonic generation reveals matrix alterations during breast tumor progression

    Science.gov (United States)

    Burke, Kathleen; Tang, Ping; Brown, Edward

    2013-03-01

    Alteration of the extracellular matrix in tumor stroma influences efficiency of cell locomotion away from the primary tumor into surrounding tissues and vasculature, thereby affecting metastatic potential. We study matrix changes in breast cancer through the use of second harmonic generation (SHG) of collagen in order to improve the current understanding of breast tumor stromal development. Specifically, we utilize a quantitative analysis of the ratio of forward to backward propagating SHG signal (F/B ratio) to monitor collagen throughout ductal and lobular carcinoma development. After detection of a significant decrease in the F/B ratio of invasive but not in situ ductal carcinoma compared with healthy tissue, the collagen F/B ratio is investigated to determine the evolution of fibrillar collagen changes throughout tumor progression. Results are compared with the progression of lobular carcinoma, whose F/B signature also underwent significant evolution during progression, albeit in a different manner, which offers insight into varying methods of tissue penetration and collagen manipulation between the carcinomas. This research provides insights into trends of stromal reorganization throughout breast tumor development.

  10. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  11. Cross-Layer Scheduling and Resource Allocation for Heterogeneous Traffic in 3G LTE

    Directory of Open Access Journals (Sweden)

    Richard Musabe

    2014-01-01

    Full Text Available 3G long term evolution (LTE introduces stringent needs in order to provide different kinds of traffic with Quality of Service (QoS characteristics. The major problem with this nature of LTE is that it does not have any paradigm scheduling algorithm that will ideally control the assignment of resources which in turn will improve the user satisfaction. This has become an open subject and different scheduling algorithms have been proposed which are quite challenging and complex. To address this issue, in this paper, we investigate how our proposed algorithm improves the user satisfaction for heterogeneous traffic, that is, best-effort traffic such as file transfer protocol (FTP and real-time traffic such as voice over internet protocol (VoIP. Our proposed algorithm is formulated using the cross-layer technique. The goal of our proposed algorithm is to maximize the expected total user satisfaction (total-utility under different constraints. We compared our proposed algorithm with proportional fair (PF, exponential proportional fair (EXP-PF, and U-delay. Using simulations, our proposed algorithm improved the performance of real-time traffic based on throughput, VoIP delay, and VoIP packet loss ratio metrics while PF improved the performance of best-effort traffic based on FTP traffic received, FTP packet loss ratio, and FTP throughput metrics.

  12. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  13. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  14. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  15. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  16. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  17. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  18. Waste management fiscal year 1998 progress report

    International Nuclear Information System (INIS)

    1998-01-01

    The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project's production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks

  19. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  20. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  1. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  2. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  3. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  4. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  5. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  6. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  7. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  8. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  9. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  10. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  11. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  12. Efficacy and Safety of Regorafenib With 2/1 Schedule for Patients ≥ 75 Years With Metastatic Colorectal Cancer (mCRC) After Failure of 2 Lines of Chemotherapy.

    Science.gov (United States)

    Petrioli, Roberto; Chirra, Martina; Messuti, Luciana; Fiaschi, Anna Ida; Savelli, Vinno; Martellucci, Ignazio; Francini, Edoardo

    2018-02-21

    In the CORRECT (patients with metastatic COloRectal Cancer treated with REgorafenib or plaCebo after failure of standard Therapy) trial, regorafenib was proven to extend survival of patients with metastatic colorectal cancer (mCRC) that progressed after all available therapies. Grade 3 to 4 toxicity occurred in 54% of patients, and data on the activity and tolerability of regorafenib in elderly patients were scarce. The aim of this study was to evaluate the efficacy and safety of an alternative schedule, 2-week-on treatment and 1 week-off (2/1 schedule), of regorafenib for elderly patients with mCRC. Patients ≥ 75 years with mCRC who progressed after oxaliplatin- and irinotecan-based chemotherapy received regorafenib on a 2/1 schedule. Potentially frail subjects were identified by G8 screening tool and excluded. The 2-month disease-control rate was the primary endpoint, and the secondary endpoints included safety, progression-free survival (PFS), overall survival (OS), and objective response rate. Between February 2014 and May 2017, 23 patients with mCRC were recruited at our institution. No partial or complete responses were observed, and the stable disease and disease-control rate were 52.2%. The median PFS was 4.8 months (95% confidence interval, 3.8-6.3 months), and the median OS was 8.9 months (95% confidence interval, 6.9-10.6 months). Adverse events were uncommon, and the most frequent grade 3 toxicity adverse events were hand-foot skin reaction (9%) and fatigue (9%). Toxicity-related dose reductions and discontinuations occurred in 5 and 2 patients, respectively. Regorafenib administered with a modified 2/1 schedule to patients who were aged ≥ 75 years and non-frail with treatment-refractory mCRC seems to be tolerable and achieve encouraging results in terms of PFS and OS. Copyright © 2018. Published by Elsevier Inc.

  13. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  14. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  15. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  16. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  17. Signal validation for nuclear power plants: Progress report No. 8, January--March 1989

    International Nuclear Information System (INIS)

    Upadhyaya, B.R.; Kerlin, T.W.

    1989-01-01

    This report is a summary of the progress in the US Department of Energy sponsored project on Signal Validation for Nuclear Power Plants, for the period January--March, 1989. This is the last phase of the project with September 29, 1989 as the official ending date. A preliminary draft of a two-volume final report is scheduled for release in mid-September

  18. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  19. 77 FR 33980 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-08

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... the Board's proposed FOIA Fee Schedule Update published in the Federal Register of June 1, 2012. The...: The FOIA requires each Federal agency covered by the Act to specify a schedule of fees applicable to...

  20. Adaptive Subframe Partitioning and Efficient Packet Scheduling in OFDMA Cellular System with Fixed Decode-and-Forward Relays

    Science.gov (United States)

    Wang, Liping; Ji, Yusheng; Liu, Fuqiang

    The integration of multihop relays with orthogonal frequency-division multiple access (OFDMA) cellular infrastructures can meet the growing demands for better coverage and higher throughput. Resource allocation in the OFDMA two-hop relay system is more complex than that in the conventional single-hop OFDMA system. With time division between transmissions from the base station (BS) and those from relay stations (RSs), fixed partitioning of the BS subframe and RS subframes can not adapt to various traffic demands. Moreover, single-hop scheduling algorithms can not be used directly in the two-hop system. Therefore, we propose a semi-distributed algorithm called ASP to adjust the length of every subframe adaptively, and suggest two ways to extend single-hop scheduling algorithms into multihop scenarios: link-based and end-to-end approaches. Simulation results indicate that the ASP algorithm increases system utilization and fairness. The max carrier-to-interference ratio (Max C/I) and proportional fairness (PF) scheduling algorithms extended using the end-to-end approach obtain higher throughput than those using the link-based approach, but at the expense of more overhead for information exchange between the BS and RSs. The resource allocation scheme using ASP and end-to-end PF scheduling achieves a tradeoff between system throughput maximization and fairness.

  1. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  2. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  3. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  4. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  5. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  6. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  7. Roux-en-Y gastric bypass increases intravenous ethanol self-administration in dietary obese rats.

    Directory of Open Access Journals (Sweden)

    James E Polston

    Full Text Available Roux-en-Y gastric bypass surgery (RYGB is an effective treatment for severe obesity. Clinical studies however have reported susceptibility to increased alcohol use after RYGB, and preclinical studies have shown increased alcohol intake in obese rats after RYGB. This could reflect a direct enhancement of alcohol's rewarding effects in the brain or an indirect effect due to increased alcohol absorption after RGYB. To rule out the contribution that changes in alcohol absorption have on its rewarding effects, here we assessed the effects of RYGB on intravenously (IV administered ethanol (1%. For this purpose, high fat (60% kcal from fat diet-induced obese male Sprague Dawley rats were tested ~2 months after RYGB or sham surgery (SHAM using both fixed and progressive ratio schedules of reinforcement to evaluate if RGYB modified the reinforcing effects of IV ethanol. Compared to SHAM, RYGB rats made significantly more active spout responses to earn IV ethanol during the fixed ratio schedule, and achieved higher breakpoints during the progressive ratio schedule. Although additional studies are needed, our results provide preliminary evidence that RYGB increases the rewarding effects of alcohol independent of its effects on alcohol absorption.

  8. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  9. Optimal Temporal Decoupling in Task Scheduling with Preferences

    NARCIS (Netherlands)

    Endhoven, L.; Klos, T.B.; Witteveen, C.

    2011-01-01

    Multi-agent planning and scheduling concerns finding a joint plan to achieve some set of common goals with several independent agents each aiming to find a plan or schedule for their part of the goals. To avoid conflicts in these individual plans or schedules decoupling is used. Such a decoupling

  10. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  11. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  12. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  13. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  14. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  15. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  16. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  17. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  18. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    Science.gov (United States)

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  19. Progressive IRP Models for Power Resources Including EPP

    Directory of Open Access Journals (Sweden)

    Yiping Zhu

    2017-01-01

    Full Text Available In the view of optimizing regional power supply and demand, the paper makes effective planning scheduling of supply and demand side resources including energy efficiency power plant (EPP, to achieve the target of benefit, cost, and environmental constraints. In order to highlight the characteristics of different supply and demand resources in economic, environmental, and carbon constraints, three planning models with progressive constraints are constructed. Results of three models by the same example show that the best solutions to different models are different. The planning model including EPP has obvious advantages considering pollutant and carbon emission constraints, which confirms the advantages of low cost and emissions of EPP. The construction of progressive IRP models for power resources considering EPP has a certain reference value for guiding the planning and layout of EPP within other power resources and achieving cost and environmental objectives.

  20. Performance and control study of a low-pressure-ratio turbojet engine for a drone aircraft

    Science.gov (United States)

    Seldner, K.; Geyser, L. C.; Gold, H.; Walker, D.; Burgner, G.

    1972-01-01

    The results of analog and digital computer studies of a low-pressure-ratio turbojet engine system for use in a drone vehicle are presented. The turbojet engine consists of a four-stage axial compressor, single-stage turbine, and a fixed area exhaust nozzle. Three simplified fuel schedules and a generalized parameter fuel control for the engine system are presented and evaluated. The evaluation is based on the performance of each schedule or control during engine acceleration from a windmill start at Mach 0.8 and 6100 meters to 100 percent corrected speed. It was found that, because of the higher acceleration margin permitted by the control, the generalized parameter control exhibited the best dynamic performance.

  1. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  2. Multiple-Machine Scheduling with Learning Effects and Cooperative Games

    Directory of Open Access Journals (Sweden)

    Yiyuan Zhou

    2015-01-01

    Full Text Available Multiple-machine scheduling problems with position-based learning effects are studied in this paper. There is an initial schedule in this scheduling problem. The optimal schedule minimizes the sum of the weighted completion times; the difference between the initial total weighted completion time and the minimal total weighted completion time is the cost savings. A multiple-machine sequencing game is introduced to allocate the cost savings. The game is balanced if the normal processing times of jobs that are on the same machine are equal and an equal number of jobs are scheduled on each machine initially.

  3. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  4. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    Science.gov (United States)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  5. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  6. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  7. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  8. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  9. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  10. Iso-effect tables and therapeutic ratios for epidermoid cancer and normal tissue stroma

    International Nuclear Information System (INIS)

    Cohen, L.; Creditor, M.

    1983-01-01

    Available literature on radiation injury to normal tissue stroma and ablation of epidermoid carcinoma was surveyed. Computer programs (RAD3 and RAD1) were then used to derive cell kinetic parameters and generate iso-effect tables for the relevant tissues. The two tables provide a set of limiting doses for tolerance of normal connective tissue (16% risk of injury) and for ablation of epidermoid cancer (16% risk of recurrence) covering a wide range of treatment schedules. Calculating the ratios of normal tissue tolerance to tumor control doses for each treatment scheme provides an array of therapeutic ratios, from which appropriate treatment schemes can be selected

  11. Schedulability of Herschel revisited using statistical model checking

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Legay, Axel

    2015-01-01

    -approximation technique. We can safely conclude that the system is schedulable for varying values of BCET. For the cases where deadlines are violated, we use polyhedra to try to confirm the witnesses. Our alternative method to confirm non-schedulability uses statistical model-checking (SMC) to generate counter...... and blocking times of tasks. Consequently, the method may falsely declare deadline violations that will never occur during execution. This paper is a continuation of previous work of the authors in applying extended timed automata model checking (using the tool UPPAAL) to obtain more exact schedulability...... analysis, here in the presence of non-deterministic computation times of tasks given by intervals [BCET,WCET]. Computation intervals with preemptive schedulers make the schedulability analysis of the resulting task model undecidable. Our contribution is to propose a combination of model checking techniques...

  12. A Deadline-Aware Scheduling and Forwarding Scheme in Wireless Sensor Networks.

    Science.gov (United States)

    Dao, Thi-Nga; Yoon, Seokhoon; Kim, Jangyoung

    2016-01-05

    Many applications in wireless sensor networks (WSNs) require energy consumption to be minimized and the data delivered to the sink within a specific delay. A usual solution for reducing energy consumption is duty cycling, in which nodes periodically switch between sleep and active states. By increasing the duty cycle interval, consumed energy can be reduced more. However, a large duty cycle interval causes a long end-to-end (E2E) packet delay. As a result, the requirement of a specific delay bound for packet delivery may not be satisfied. In this paper, we aim at maximizing the duty cycle while still guaranteeing that the packets arrive at the sink with the required probability, i.e., the required delay-constrained success ratio (DCSR) is achieved. In order to meet this objective, we propose a novel scheduling and forwarding scheme, namely the deadline-aware scheduling and forwarding (DASF) algorithm. In DASF, the E2E delay distribution with the given network model and parameters is estimated in order to determine the maximum duty cycle interval, with which the required DCSR is satisfied. Each node independently selects a wake-up time using the selected interval, and packets are forwarded to a node in the potential forwarding set, which is determined based on the distance between nodes and the sink. DASF does not require time synchronization between nodes, and a node does not need to maintain neighboring node information in advance. Simulation results show that the proposed scheme can satisfy a required delay-constrained success ratio and outperforms existing algorithms in terms of E2E delay and DCSR.

  13. A Deadline-Aware Scheduling and Forwarding Scheme in Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Thi-Nga Dao

    2016-01-01

    Full Text Available Many applications in wireless sensor networks (WSNs require energy consumption to be minimized and the data delivered to the sink within a specific delay. A usual solution for reducing energy consumption is duty cycling, in which nodes periodically switch between sleep and active states. By increasing the duty cycle interval, consumed energy can be reduced more. However, a large duty cycle interval causes a long end-to-end (E2E packet delay. As a result, the requirement of a specific delay bound for packet delivery may not be satisfied. In this paper, we aim at maximizing the duty cycle while still guaranteeing that the packets arrive at the sink with the required probability, i.e., the required delay-constrained success ratio (DCSR is achieved. In order to meet this objective, we propose a novel scheduling and forwarding scheme, namely the deadline-aware scheduling and forwarding (DASF algorithm. In DASF, the E2E delay distribution with the given network model and parameters is estimated in order to determine the maximum duty cycle interval, with which the required DCSR is satisfied. Each node independently selects a wake-up time using the selected interval, and packets are forwarded to a node in the potential forwarding set, which is determined based on the distance between nodes and the sink. DASF does not require time synchronization between nodes, and a node does not need to maintain neighboring node information in advance. Simulation results show that the proposed scheme can satisfy a required delay-constrained success ratio and outperforms existing algorithms in terms of E2E delay and DCSR.

  14. Schedule dependent synergy of gemcitabine and doxorubicin: Improvement of in vitro efficacy and lack of in vitro-in vivo correlation.

    Science.gov (United States)

    Vogus, Douglas R; Pusuluri, Anusha; Chen, Renwei; Mitragotri, Samir

    2018-01-01

    Combination chemotherapy is commonly used to treat late stage cancer; however, treatment is often limited by systemic toxicity. Optimizing drug ratio and schedule can improve drug combination activity and reduce dose to lower toxicity. Here, we identify gemcitabine (GEM) and doxorubicin (DOX) as a synergistic drug pair in vitro for the triple negative breast cancer cell line MDA-MB-231. Drug synergy and caspase activity were increased the most by exposing cells to GEM prior to DOX in vitro. While the combination was more effective than the single drugs at inhibiting MDA-MB-231 growth in vivo, the clear schedule dependence observed in vitro was not observed in vivo. Differences in drug exposure and cellular behavior in vivo compared to in vitro are likely responsible. This study emphasizes the importance in understanding how schedule impacts drug synergy and the need to develop more advanced strategies to translate synergy to the clinic.

  15. The Synthesis of a Hardware Scheduler for Non-Manifest Loops

    NARCIS (Netherlands)

    Mansour, O.; Molenkamp, Egbert; Krol, Th.

    This paper addresses the hardware implementation of a dynamic scheduler for non-manifest data dependent periodic loops. Static scheduling techniques which are known to give near optimal scheduling-solutions for manifest loops, fail at scheduling non-manifest loops, since they lack the run time

  16. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  17. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  18. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  19. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  20. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  1. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  2. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  3. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  4. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  5. Annual Equivalent Value, Benefit Cost Ratio, and Composite Performance Index as Valuation Appraisal Support of Teakwood Plantation

    Directory of Open Access Journals (Sweden)

    Sugiharto Soeleman

    2014-04-01

    Full Text Available Teak (Tectona grandis L.f is a premium high-value hardwood species being viewed as the most preferred species for investment opportunity. Recently, there has been a gradual move away from state control of teakwood plantation toward the participation of private enterprises. Several enterprises offer investment opportunity of teakwood plantation in which one of the main selling points being offered is a quick harvesting schedule. A quick harvesting time, however, might not provide the best outcome to the investors. This research exercise and compare the valuation appraisal of different harvesting schedules. The research focused on project planning, enterprise budget, financial projection, and valuation measurements to arrive at overall appraisal. To avoid any possible bias of individual investor's preference on common valuation criteria such as total investment, net cash flow (NCF, net present value (NPV, internal rate of return (IRR, profit on investment (P/I, and payback period (PBP, 3 otherS criteria namely benefit cost ratio (BCR, annual equivalent value (AEV, and composite performance index (CPI have been applied to arrive at a more fair valuation. It is concluded that the longer the harvesting schedule, the better valuation outcome could be achieved, and therefore, investors should critically review any investment proposal in accordance to their preference on valuation criteria. Keywords : annual equivalent value, benefit cost ratio, composite performance index, valuation appraisal

  6. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  7. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  8. Tail-robust scheduling using Limited Processor Sharing.

    NARCIS (Netherlands)

    Nair, J.K.; Wierman, A.; Zwart, A.P.

    2010-01-01

    From a rare events perspective, scheduling disciplines that work well under light (exponential) tailed workload distributions do not perform well under heavy (power) tailed workload distributions, and vice versa, leading to fundamental problems in designing schedulers that are robust to

  9. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  10. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  11. Effects of Instructional Ratios on Students' Reading Performance in a Regular Education Program.

    Science.gov (United States)

    Roberts, Maura L.; Shapiro, Edward S.

    1996-01-01

    Used 4 experimental conditions to examine the effectiveness of different instructional ratios of known to unknown vocabulary words on the reading progress of 46 students. Results suggest that students acquired new information as instructional ratios expanded. An inverse relationship was established between instructional material presented and…

  12. Feasibility, Safety, and Efficacy of an Alternative Schedule of Sunitinib for the Treatment of Patients with Metastatic Renal Cell Carcinoma: A Retrospective Study.

    Science.gov (United States)

    Buti, Sebastiano; Donini, Maddalena; Bersanelli, Melissa; Gattara, Alessia; Leonardi, Francesco; Passalacqua, Rodolfo

    2017-12-01

    Standard treatment with sunitinib for patients with metastatic renal cancer provides an 'on-off' schedule (daily administration of a 50-mg capsule for 4 weeks, followed by a 2-week break; consecutive 6-week cycles). We developed an alternative intermittent schedule to reduce the toxicity and symptoms of tumor regrowth during the rest period and to allow prolonged continuation of therapy, maintaining dose intensity. The objective of this study was to provide a retrospective evaluation of the feasibility, safety, and efficacy of an alternative schedule of sunitinib in patients who did not tolerate classical treatment. Patients treated with the classical schedule with at least grade 2 toxicity or recurrence of symptoms during the rest period were switched to an alternative schedule (the same daily dose 5 consecutive days per week for 5 weeks and then the same daily dose on days 1, 3, and 5 in the sixth week; consecutive 6-week cycles). Twenty-five patients were enrolled. The median time from sunitinib initiation to schedule switch was 2.9 months. After the switch, the median therapy duration was 9.2 months. Rate of delay, corrected by cycle number, was 10% for both schedules. After the switch, 48.7% of patients obtained a toxicity reduction (hypertension -82%, stomatitis -71%, cutaneous toxicity -69%). A reduction in 'on-off symptoms' (-86%) was achieved. Overall response rate was 40% and the disease control rate was 80%. Median progression-free survival was 16.4 months and median overall survival was 41.3 months. Despite the small sample size and retrospective nature, we demonstrated the feasibility, safety, and efficacy of the alternative schedule, allowing prolonged treatment and better quality of life.

  13. User interface issues in supporting human-computer integrated scheduling

    Science.gov (United States)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

  14. Some extensions of the discrete lotsizing and scheduling problem

    NARCIS (Netherlands)

    M. Salomon (Marc); L.G. Kroon (Leo); R. Kuik (Roelof); L.N. van Wassenhove (Luk)

    1991-01-01

    textabstractIn this paper the Discrete Lotsizing and Scheduling Problem (DLSP) is considered. DLSP relates to capacitated lotsizing as well as to job scheduling problems and is concerned with determining a feasible production schedule with minimal total costs in a single-stage manufacturing process.

  15. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  16. Microcomputer-based workforce scheduling for hospital porters.

    Science.gov (United States)

    Lin, C K

    1999-01-01

    This paper focuses on labour scheduling for hospital porters who are the major workforce providing routine cleansing of wards, transportation and messenger services. Generating an equitable monthly roster for porters while meeting the daily minimum demand is a tedious task scheduled manually by a supervisor. In considering a variety of constraints and goals, a manual schedule was usually produced in seven to ten days. To be in line with the strategic goal of scientific management of an acute care regional hospital in Hong Kong, a microcomputer-based algorithm was developed to schedule the monthly roster. The algorithm, coded in Digital Visual Fortran 5.0 Professional, could generate a monthly roster in seconds. Implementation has been carried out since September 1998 and the results proved to be useful to hospital administrators and porters. This paper discusses both the technical and human issues involved during the computerization process.

  17. Car painting process scheduling with harmony search algorithm

    Science.gov (United States)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  18. Dynamic Scheduling for Cloud Reliability using Transportation Problem

    OpenAIRE

    P. Balasubramanie; S. K. Senthil Kumar

    2012-01-01

    Problem statement: Cloud is purely a dynamic environment and the existing task scheduling algorithms are mostly static and considered various parameters like time, cost, make span, speed, scalability, throughput, resource utilization, scheduling success rate and so on. Available scheduling algorithms are mostly heuristic in nature and more complex, time consuming and does not consider reliability and availability of the cloud computing environment. Therefore there is a need to implement a sch...

  19. National Research Council Dialogue to Assess Progress on NASA's Systems Engineering Cost/Risk Analysis Capability Roadmap Development: General Background and Introduction

    Science.gov (United States)

    Regenie, Victoria

    2005-01-01

    Contents include the following: General Background and Introduction of Capability. Roadmaps for Systems Engineering Cost/Risk Analysis. Agency Objectives. Strategic Planning Transformation. Review Capability Roadmaps and Schedule. Review Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  20. Optimal Algorithms and a PTAS for Cost-Aware Scheduling

    NARCIS (Netherlands)

    L. Chen; N. Megow; R. Rischke; L. Stougie (Leen); J. Verschae

    2015-01-01

    htmlabstractWe consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling objectives of minimizing the makespan and the

  1. 5 CFR 532.513 - Flexible and compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Flexible and compressed work schedules... REGULATIONS PREVAILING RATE SYSTEMS Premium Pay and Differentials § 532.513 Flexible and compressed work schedules. Federal Wage System employees who are authorized to work flexible and compressed work schedules...

  2. Distributing Flexibility to Enhance Robustness in Task Scheduling Problems

    NARCIS (Netherlands)

    Wilmer, D.; Klos, T.B.; Wilson, M.

    2013-01-01

    Temporal scheduling problems occur naturally in many diverse application domains such as manufacturing, transportation, health and education. A scheduling problem arises if we have a set of temporal events (or variables) and some constraints on those events, and we have to find a schedule, which is

  3. Self-reported Medication Adherence and CKD Progression

    Directory of Open Access Journals (Sweden)

    Esteban A. Cedillo-Couvert

    2018-05-01

    Full Text Available Introduction: In the general population, medication nonadherence contributes to poorer outcomes. However, little is known about medication adherence among adults with chronic kidney disease (CKD. We evaluated the association of self-reported medication adherence with CKD progression and all-cause death in patients with CKD. Methods: In this prospective observational study of 3305 adults with mild-to-moderate CKD enrolled in the Chronic Renal Insufficiency Cohort (CRIC Study, the baseline self-reported medication adherence was assessed by responses to 3 questions and categorized as high, medium, and low. CKD progression (50% decline in eGFR or incident end-stage renal disease and all-cause death were measured using multivariable Cox proportional hazards. Results: Of the patients, 68% were categorized as high adherence, 17% medium adherence, and 15% low adherence. Over a median follow-up of 6 years, there were 969 CKD progression events and 675 deaths. Compared with the high-adherence group, the low-adherence group experienced increased risk for CKD progression (hazard ratio = 1.27, 95% confidence interval = 1.05, 1.54 after adjustment for sociodemographic and clinical factors, cardiovascular medications, number of medication types, and depressive symptoms. A similar association existed between low adherence and all-cause death, but did not reach standard statistical significance (hazard ratio = 1.14 95% confidence interval = 0.88, 1.47. Conclusion: Baseline self-reported low medication adherence was associated with an increased risk for CKD progression. Future work is needed to better understand the mechanisms underlying this association and to develop interventions to improve adherence. Keywords: CKD, death, medication adherence, progression

  4. ESSOPE: Towards S/C operations with reactive schedule planning

    Science.gov (United States)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  5. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  6. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  7. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  8. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  9. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  10. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  11. Manufacturing Scheduling Using Colored Petri Nets and Reinforcement Learning

    Directory of Open Access Journals (Sweden)

    Maria Drakaki

    2017-02-01

    Full Text Available Agent-based intelligent manufacturing control systems are capable to efficiently respond and adapt to environmental changes. Manufacturing system adaptation and evolution can be addressed with learning mechanisms that increase the intelligence of agents. In this paper a manufacturing scheduling method is presented based on Timed Colored Petri Nets (CTPNs and reinforcement learning (RL. CTPNs model the manufacturing system and implement the scheduling. In the search for an optimal solution a scheduling agent uses RL and in particular the Q-learning algorithm. A warehouse order-picking scheduling is presented as a case study to illustrate the method. The proposed scheduling method is compared to existing methods. Simulation and state space results are used to evaluate performance and identify system properties.

  12. Best Speed Fit EDF Scheduling for Performance Asymmetric Multiprocessors

    Directory of Open Access Journals (Sweden)

    Peng Wu

    2017-01-01

    Full Text Available In order to improve the performance of a real-time system, asymmetric multiprocessors have been proposed. The benefits of improved system performance and reduced power consumption from such architectures cannot be fully exploited unless suitable task scheduling and task allocation approaches are implemented at the operating system level. Unfortunately, most of the previous research on scheduling algorithms for performance asymmetric multiprocessors is focused on task priority assignment. They simply assign the highest priority task to the fastest processor. In this paper, we propose BSF-EDF (best speed fit for earliest deadline first for performance asymmetric multiprocessor scheduling. This approach chooses a suitable processor rather than the fastest one, when allocating tasks. With this proposed BSF-EDF scheduling, we also derive an effective schedulability test.

  13. Multiprocessor Real-Time Scheduling with Hierarchical Processor Affinities

    OpenAIRE

    Bonifaci , Vincenzo; Brandenburg , Björn; D'Angelo , Gianlorenzo; Marchetti-Spaccamela , Alberto

    2016-01-01

    International audience; Many multiprocessor real-time operating systems offer the possibility to restrict the migrations of any task to a specified subset of processors by setting affinity masks. A notion of " strong arbitrary processor affinity scheduling " (strong APA scheduling) has been proposed; this notion avoids schedulability losses due to overly simple implementations of processor affinities. Due to potential overheads, strong APA has not been implemented so far in a real-time operat...

  14. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  15. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  16. 16 CFR 5.60 - Scheduling of hearing.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Scheduling of hearing. 5.60 Section 5.60 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE STANDARDS OF CONDUCT Disciplinary Actions Concerning Postemployment Conflict of Interest § 5.60 Scheduling of hearing...

  17. Elevations in the Fasting Serum Proinsulin–to–C-Peptide Ratio Precede the Onset of Type 1 Diabetes

    Science.gov (United States)

    Sims, Emily K.; Chaudhry, Zunaira; Watkins, Renecia; Syed, Farooq; Blum, Janice; Ouyang, Fangqian; Perkins, Susan M.; Mirmira, Raghavendra G.; Sosenko, Jay; DiMeglio, Linda A.

    2016-01-01

    OBJECTIVE We tested whether an elevation in the serum proinsulin–to–C-peptide ratio (PI:C), a biomarker of β-cell endoplasmic reticulum (ER) dysfunction, was associated with progression to type 1 diabetes. RESEARCH DESIGN AND METHODS Fasting total PI and C levels were measured in banked serum samples obtained from TrialNet Pathway to Prevention (PTP) participants, a cohort of autoantibody-positive relatives without diabetes of individuals with type 1 diabetes. Samples were obtained ∼12 months before diabetes onset from PTP progressors in whom diabetes developed (n = 60), and were compared with age-, sex-, and BMI-matched nonprogressors who remained normoglycemic (n = 58). PI:C ratios were calculated as molar ratios and were multiplied by 100% to obtain PI levels as a percentage of C levels. RESULTS Although absolute PI levels did not differ between groups, PI:C ratios were significantly increased in antibody-positive subjects in whom there was progression to diabetes compared with nonprogressors (median 1.81% vs. 1.17%, P = 0.03). The difference between groups was most pronounced in subjects who were ≤10 years old, where the median progressor PI:C ratio was nearly triple that of nonprogressors; 90.0% of subjects in this age group within the upper PI:C quartile progressed to the development of diabetes. Logistic regression analysis, adjusted for age and BMI, demonstrated increased odds of progression for higher natural log PI:C ratio values (odds ratio 1.44, 95% CI 1.02, 2.05). CONCLUSIONS These data suggest that β-cell ER dysfunction precedes type 1 diabetes onset, especially in younger children. Elevations in the serum PI:C ratio may have utility in predicting the onset of type 1 diabetes in the presymptomatic phase. PMID:27385327

  18. Elevations in the Fasting Serum Proinsulin-to-C-Peptide Ratio Precede the Onset of Type 1 Diabetes.

    Science.gov (United States)

    Sims, Emily K; Chaudhry, Zunaira; Watkins, Renecia; Syed, Farooq; Blum, Janice; Ouyang, Fangqian; Perkins, Susan M; Mirmira, Raghavendra G; Sosenko, Jay; DiMeglio, Linda A; Evans-Molina, Carmella

    2016-09-01

    We tested whether an elevation in the serum proinsulin-to-C-peptide ratio (PI:C), a biomarker of β-cell endoplasmic reticulum (ER) dysfunction, was associated with progression to type 1 diabetes. Fasting total PI and C levels were measured in banked serum samples obtained from TrialNet Pathway to Prevention (PTP) participants, a cohort of autoantibody-positive relatives without diabetes of individuals with type 1 diabetes. Samples were obtained ∼12 months before diabetes onset from PTP progressors in whom diabetes developed (n = 60), and were compared with age-, sex-, and BMI-matched nonprogressors who remained normoglycemic (n = 58). PI:C ratios were calculated as molar ratios and were multiplied by 100% to obtain PI levels as a percentage of C levels. Although absolute PI levels did not differ between groups, PI:C ratios were significantly increased in antibody-positive subjects in whom there was progression to diabetes compared with nonprogressors (median 1.81% vs. 1.17%, P = 0.03). The difference between groups was most pronounced in subjects who were ≤10 years old, where the median progressor PI:C ratio was nearly triple that of nonprogressors; 90.0% of subjects in this age group within the upper PI:C quartile progressed to the development of diabetes. Logistic regression analysis, adjusted for age and BMI, demonstrated increased odds of progression for higher natural log PI:C ratio values (odds ratio 1.44, 95% CI 1.02, 2.05). These data suggest that β-cell ER dysfunction precedes type 1 diabetes onset, especially in younger children. Elevations in the serum PI:C ratio may have utility in predicting the onset of type 1 diabetes in the presymptomatic phase. © 2016 by the American Diabetes Association.

  19. Progress report on LOFT rake designs

    International Nuclear Information System (INIS)

    Bearden, R.G.

    1977-01-01

    Evaluation of data from Loss-of-Fluid Test (LOFT) nonnuclear tests has shown a need for profile measurements at several locations in the LOFT piping. A prototype rake consisting of three Drag-Disc Turbine Transducers (DTT) has been designed and fabricated for installation at one location (FE-BL-1) in the blowdown loop. After successful operation during a LOFT nonnuclear test (L1-4) scheduled for May, 1977, additional rakes will be installed in the primary and blowdown loops. A research program to develop a pitot tube rake for measurement of steady state and transient two-phase flows is in progress at McMaster University, Hamilton, Ontario. A rake of thermocouples and pitot tubes will be developed for installation near the emergency core coolant (ECC) injection points

  20. Fixed-Time Schedule Effects in Combination with Response-Dependent Schedules

    Science.gov (United States)

    Borrero, John C.; Bartels-Meints, Jamie A.; Sy, Jolene R.; Francisco, Monica T.

    2011-01-01

    We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response…

  1. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  2. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  3. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  4. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  5. 基于ISM的动态优先级调度算法%Dynamic Priority Schedule Algorithm Based on ISM

    Institute of Scientific and Technical Information of China (English)

    余祖峰; 蔡启先; 刘明

    2011-01-01

    The EDF schedule algorithm, one of main real-time schedule algorithms of the embedded Linux operating system, can not solve the overload schedule.For this, the paper introduces SLAD algorithm and BACKSLASH algorithm, which have good performance of system load.According to thinking of ISM algorithm, it puts forward a kind of dynamic priority schedule algorithm.According to case of overloads within some time, the algorithm can adjust EDF algorithm and SLAD algorithm neatly, thus improves schedule efficiency of system in usual load and overload cases.Test results for real-time tasks Deadline Miss Ratio(DMR) show its improvement effect.%在嵌入式Linux操作系统的实时调度算法中,EDF调度算法不能解决负载过载问题.为此,引进对系统负载有着良好表现的SLAD算法和BACKSLASH算法.基于ISM算法思路,提出一种动态优先级调度算法.该算法能根据一段时间内负载过载的情况,灵活地调度EDF算法和SLAD算法,从面提高系统在正常负载和过载情况下的调度效率.对实时任务截止期错失率DMR指标的测试结果证明了其改进效果.

  6. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  7. A novel approach to the design and operation scheduling of heterogeneous catalytic reactors

    International Nuclear Information System (INIS)

    Ghodasara, Kamlesh; Smith, Robin; Hwang, Sungwon

    2014-01-01

    A number of studies have been conducted to reduce the overall level of catalyst deactivation in heterogeneous catalytic reactors, and improve the performance of reactors, such as yield, conversion or selectivity. The methodology generally includes optimization of the following: (1) operating conditions of the reaction system, such as feed temperature, normal operating temperature, pressure, and composition of feed streams; (2) reactor design parameters, such as dimension of the reactor, side stream distribution along the axis of the reactor beds, the mixing ratio of inert catalyst at each bed; and (3) catalyst design parameters, such as the pore size distribution across the pellet, active material distribution, size and shape of the catalyst, etc. Few studies have examined optimization of the overall catalyst reactor performance throughout the catalyst lifetime, considering catalyst deactivation. Furthermore, little attention has been given to the impact of various configurations of reactor networks and scheduling of the reactor operation (i.e., online and offline-regeneration) on the overall reactor performance throughout the catalyst lifetime. Therefore, we developed a range of feasible sequences of reactors and scheduling of reactors for operation and regeneration, and compared the overall reactor performance of multiple cases. Furthermore, a superstructure of reactor networks was developed and optimized to determine the optimum reactor network that shows the maximum overall reactor performance. The operating schedule of each reactor in the network was considered further. Lastly, the methodology was illustrated using a case study of the MTO (methanol to olefin) process

  8. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    Science.gov (United States)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  9. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  10. Perceptions of Teachers in South Florida Toward Block Scheduling.

    Science.gov (United States)

    Hamdy, Mona; Urich, Ted

    1998-01-01

    A study was conducted at two metropolitan South Florida high schools to determine perceptions of 100 teachers concerning block scheduling. Teachers felt that the 4 X 4 block schedule contained too many time gaps for teaching foreign languages, English, and math. Teachers believed block schedules benefitted advanced students more than others and…

  11. 29 CFR 2520.103-10 - Annual report financial schedules.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Annual report financial schedules. 2520.103-10 Section 2520... financial schedules. (a) General. The administrator of a plan filing an annual report pursuant to § 2520.103... of the annual report the separate financial schedules described in paragraph (b) of this section. (b...

  12. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  13. S.E.N.S.I.B. project. Progress report 2006

    International Nuclear Information System (INIS)

    2007-01-01

    This report presents the state of progress of all the studies which establish at present the S.E.N.S.I.B. project. For year 2006, the progress of the project is globally in compliance with the general schedule of realization of the S.E.N.S.I.B. project and with the perspectives announced in 2005. Factors of sensitivity were identified in diverse circles ( thematic studies) and methods and specific tools of the project are developed. 14 publications (reviews and congress) and 9 I.R.S.N. reports were produced. An international work group was launched to the I.R.S.N. initiative. The web site of S.E.N.S.I.B. on the I.R.S.N. scientific site was built. The S.E.N.S.I.B. project receives a financial participation of the Ademe. (N.C.)

  14. Progression in Running Intensity or Running Volume and the Development of Specific Injuries in Recreational Runners: Run Clever, a Randomized Trial Using Competing Risks.

    Science.gov (United States)

    Ramskov, Daniel; Rasmussen, Sten; Sørensen, Henrik; Parner, Erik Thorlund; Lind, Martin; Nielsen, Rasmus

    2018-06-12

    Study Design Randomized clinical trial, etiology. Background Training intensity and volume have been proposed to be associated with specific running-related injuries. If such an association exists, secondary preventive measures could be initiated by clinicians based on symptoms of a specific injury diagnosis. Objectives To test the following hypotheses: (i) A running schedule focusing on intensity will increase the risk of sustaining Achilles tendinopathy, gastrocnemius injuries and plantar fasciitis compared with hypothesized volume-related injuries. (ii) A running schedule focusing on running volume will increase the risk of sustaining patellofemoral pain syndrome, iliotibial band syndrome and patellar tendinopathy compared with hypothesized intensity-related injuries. Methods Healthy recreational runners were included in a 24-week follow-up, divided into 8-week preconditioning and 16-week specific focus-training. Participants were randomized to one of two running schedules: Schedule Intensity(Sch-I) or Schedule Volume(Sch-V). Sch-I progressed the amount of high intensity running (≥88% VO2max) each week. Sch-V progressed total weekly running volume. Global positioning system watch or smartphone collected data on running. Running-related injuries were diagnosed based on a clinical examination. Estimates were risk difference (RD) and 95%CI. Results Of 447 runners, a total of 80 sustained an injury (Sch-I n=36; Sch-V n=44). Risk of intensity injuries in Sch-I were: RD 2-weeks =-0.8%[-5.0;3.4]; RD 4-weeks =-0.8%[-6.7;5.1]; RD 8-weeks =-2.0%[-9.2;5.1]; RD 16-weeks =-5.1%[-16.5;6.3]. Risk of volume injuries in Sch-V were: RD 2-weeks =-0.9%[-5.0;3.2]; RD 4-weeks =-2.0%[-7.5;3.5]; RD 8-weeks =-3.2%[-9.1;2.7]; RD 16-weeks =-3.4%[-13.2;6.2]. Conclusion No difference in risk of hypothesized intensity and volume specific running-related injuries exist between running schedules focused on progression in either running intensity or volume. Level of Evidence Etiology, level 1

  15. Alternative Work Schedules in Office and Nonoffice Work Settings.

    Science.gov (United States)

    Kirk, Raymond J.; Barton, H. David

    A rapidly growing change in the workplace is the replacement of a fixed work schedule with a variety of alternative work schedules (AWS), including both flexible and compressed schedules. Experimenting organizations (N=901) evaluated one of four major categories of AWS in office and nonoffice settings, i.e., a flexible 8-hour day;…

  16. Parametric Cost and Schedule Modeling for Early Technology Development

    Science.gov (United States)

    2018-04-02

    Research NoteNational Security Rep rt PARAMETRIC MODELING FOR EARLY TECHNOLOGY DEVELOPMENT COST AND SCHEDULE Chuck...Alexander NSR_11x17_Cover_CostModeling_v8.indd 1 11/20/17 3:15 PM PARAMETRIC COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT Chuck...COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT iii Contents Figures

  17. A Market-Based Approach to Multi-factory Scheduling

    Science.gov (United States)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  18. Comparison of two dose and three dose human papillomavirus vaccine schedules: cost effectiveness analysis based on transmission model.

    Science.gov (United States)

    Jit, Mark; Brisson, Marc; Laprise, Jean-François; Choi, Yoon Hong

    2015-01-06

    To investigate the incremental cost effectiveness of two dose human papillomavirus vaccination and of additionally giving a third dose. Cost effectiveness study based on a transmission dynamic model of human papillomavirus vaccination. Two dose schedules for bivalent or quadrivalent human papillomavirus vaccines were assumed to provide 10, 20, or 30 years' vaccine type protection and cross protection or lifelong vaccine type protection without cross protection. Three dose schedules were assumed to give lifelong vaccine type and cross protection. United Kingdom. Males and females aged 12-74 years. No, two, or three doses of human papillomavirus vaccine given routinely to 12 year old girls, with an initial catch-up campaign to 18 years. Costs (from the healthcare provider's perspective), health related utilities, and incremental cost effectiveness ratios. Giving at least two doses of vaccine seems to be highly cost effective across the entire range of scenarios considered at the quadrivalent vaccine list price of £86.50 (€109.23; $136.00) per dose. If two doses give only 10 years' protection but adding a third dose extends this to lifetime protection, then the third dose also seems to be cost effective at £86.50 per dose (median incremental cost effectiveness ratio £17,000, interquartile range £11,700-£25,800). If two doses protect for more than 20 years, then the third dose will have to be priced substantially lower (median threshold price £31, interquartile range £28-£35) to be cost effective. Results are similar for a bivalent vaccine priced at £80.50 per dose and when the same scenarios are explored by parameterising a Canadian model (HPV-ADVISE) with economic data from the United Kingdom. Two dose human papillomavirus vaccine schedules are likely to be the most cost effective option provided protection lasts for at least 20 years. As the precise duration of two dose schedules may not be known for decades, cohorts given two doses should be closely

  19. A Review Of Fault Tolerant Scheduling In Multicore Systems

    Directory of Open Access Journals (Sweden)

    Shefali Malhotra

    2015-05-01

    Full Text Available Abstract In this paper we have discussed about various fault tolerant task scheduling algorithm for multi core system based on hardware and software. Hardware based algorithm which is blend of Triple Modulo Redundancy and Double Modulo Redundancy in which Agricultural Vulnerability Factor is considered while deciding the scheduling other than EDF and LLF scheduling algorithms. In most of the real time system the dominant part is shared memory.Low overhead software based fault tolerance approach can be implemented at user-space level so that it does not require any changes at application level. Here redundant multi-threaded processes are used. Using those processes we can detect soft errors and recover from them. This method gives low overhead fast error detection and recovery mechanism. The overhead incurred by this method ranges from 0 to 18 for selected benchmarks. Hybrid Scheduling Method is another scheduling approach for real time systems. Dynamic fault tolerant scheduling gives high feasibility rate whereas task criticality is used to select the type of fault recovery method in order to tolerate the maximum number of faults.

  20. Joyo progress report, vol. 8

    International Nuclear Information System (INIS)

    1983-01-01

    Following Joyo Reactor Technology Progress Reports (Vol. 1 to Vol. 7), the name was changed to Joyo Progress Report from this volume, and the activities concerning the fast breeder experimental reactor Joyo as a whole are to be reported as quarterly report. In the fast breeder experimental reactor Joyo, the change to the core for irradiation (MK-2) from the core for breeding (MK-1) was carried out since January, 1982, in order to utilize the reactor as an irradiation facility for the development of fuel and materials. The main work was the construction of the core for irradiation by exchanging 290 fuel elements, and the exchange of upper and lower guide pipes for control rods, the reconstruction of the driving mechanism, the installation of standby neutron detector system, the acceptance and inspection of new fuel, and the transfer of spent fuel between pools were carried out. As scheduled, the core for irradiation attained the initial criticality on November 22, and the works of constructing the core were completed on December 23, 1982. Thereafter, the 100 MW performance test was begun. Various experience and valuable data were obtained in the regular inspection and the maintenance and repair works carried out at the same time, regarding the operation and maintenance of the Joyo facilities. (Kako, I.)

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  3. Healthcare Scheduling by Data Mining: Literature Review and Future Directions

    Directory of Open Access Journals (Sweden)

    Maria M. Rinder

    2012-01-01

    Full Text Available This article presents a systematic literature review of the application of industrial engineering methods in healthcare scheduling, with a focus on the role of patient behavior in scheduling. Nine articles that used mathematical programming, data mining, genetic algorithms, and local searches for optimum schedules were obtained from an extensive search of literature. These methods are new approaches to solve the problems in healthcare scheduling. Some are adapted from areas such as manufacturing and transportation. Key findings from these studies include reduced time for scheduling, capability of solving more complex problems, and incorporation of more variables and constraints simultaneously than traditional scheduling methods. However, none of these methods modeled no-show and walk-ins patient behavior. Future research should include more variables related to patient and/or environment.

  4. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  5. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    OpenAIRE

    Bożek Andrzej; Wysocki Marian

    2016-01-01

    A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also ...

  6. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  7. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  8. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  9. Prognostic value of serum heavy/light chain ratios in patients with POEMS syndrome.

    Science.gov (United States)

    Wang, Chen; Su, Wei; Cai, Qian-Qian; Cai, Hao; Ji, Wei; Di, Qian; Duan, Ming-Hui; Cao, Xin-Xin; Zhou, Dao-Bin; Li, Jian

    2016-07-01

    POEMS syndrome is a rare plasma cell dyscrasia. Serum concentrations of the monoclonal protein in this disorder are typically low, and inapplicable to monitor disease activity in most cases, resulting in limited practical and prognostic values. Novel immunoassays measuring isotype-specific heavy/light chain (HLC) pairs showed its utility in disease monitoring and outcome prediction in several plasma cell dyscrasias. We report results of HLC measurements in 90 patients with POEMS syndrome. Sixty-six patients (73%; 95% confidence interval, 63-82%) had an abnormal HLC ratio at baseline. It could stratify the risk of disease relapse and was strongly associated with worse progression-free survival in a multivariate analysis (P = 0.021; hazard ratio [HR] 6.89, 95% CI 1.34-35.43). After therapy, HLC ratios improved, with 43 patients (48%) remaining abnormal. The post-therapeutic HLC ratio, if abnormal, also remained as an independent prognostic factor associated with worse progression-free survival (P = 0.019; HR 4.30, 95% CI 1.27-14.56). These results suggest the prognostic utility of HLC ratios in clinical management of POEMS patients. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  10. Algorithm comparison for schedule optimization in MR fingerprinting.

    Science.gov (United States)

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Improved SIRAP analysis for synchronization in hierarchical scheduled real-time systems

    NARCIS (Netherlands)

    Behnam, M.; Bril, R.J.; Nolte, T.

    2009-01-01

    We present our ongoing work on synchronization in hierarchical scheduled real-time systems, where tasks are scheduled using fixed-priority pre-emptive scheduling. In this paper, we show that the original local schedulability analysis of the synchronization protocol SIRAP [4] is very pessimistic when

  12. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  13. Scheduling for energy and reliability management on multiprocessor real-time systems

    Science.gov (United States)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  14. Pittsburgh International Airport - March 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  15. Pittsburgh International Airport - April 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  16. Pittsburgh International Airport - January 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  17. Pittsburgh International Airport - February 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  18. Mixed Criticality Scheduling for Industrial Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Xi Jin

    2016-08-01

    Full Text Available Wireless sensor networks (WSNs have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality. In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones.

  19. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  20. The Application of Artificial Intelligence to Astronomical Scheduling Problems

    Science.gov (United States)

    Johnston, Mark D.

    1993-01-01

    As artificial intelligence (AI) technology has moved from the research laboratory into more and more widespread use, one of the leading applications in astronomy has been to high-profile observation scheduling. The Spike scheduling system was developed by the Space Telescope Science Institute (STScI) for the purpose of long-range scheduling of Hubble Space Telescope (HST). Spike has been in daily operational use at STScI since well before HST launch in April 1990. The system has also been adapted to schedule other missions: one of these missions (EUVE) is currently operational, while another (ASTRO-D) will be launched in February 1993. Some other future space astronomy missions (XTE, SWAS, and AXAF) are making tentative plans to use Spike. Spike has proven to be a powerful and flexible scheduling framework with applicability to a wide variety of problems.