WorldWideScience

Sample records for program interim assessment

  1. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  2. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  3. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  4. Interim reliability evaluation program (IREP)

    International Nuclear Information System (INIS)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  5. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  6. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  7. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  8. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  9. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  10. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  11. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  12. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  13. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  14. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  15. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  16. Interim data report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  17. Interim report - geotechnical site assessment methodology. Vol.1

    International Nuclear Information System (INIS)

    Tunbridge, L.W.; Richards, L.R.

    1983-05-01

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  18. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  19. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  20. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  1. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  2. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  3. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Science.gov (United States)

    2011-12-01

    ... for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance... (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam Generators.'' This LR-ISG provides the...) document, NEI 97-06, ``Steam Generator Program Guidelines,'' (NRC's Agencywide Documents Access and...

  4. Assessment report on research and development activities. Activity: 'Advanced science research' (Interim report)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-15

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') consulted an assessment committee, 'Evaluation Committee of Research Activities for Advanced Science Research' (hereinafter referred to as 'Committee') for interim assessment of 'Advanced Science Research,' in accordance with 'General Guideline for the Evaluation of Government Research and Development (R and D) Activities' by Cabinet Office, Government of Japan, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response to the JAEA's request, the Committee assessed the research programs and activities of the Advanced Science Research Center (hereinafter referred to as 'ASRC') for the period of two years from April 2010. The Committee evaluated the management and the research programs of the ASRC based on the explanatory documents prepared by the ASRC and the oral presentations with questions-and-answers by the Director and the research group leaders. This report summarizes the result of the assessment by the Committee with the Committee report attached from page 7. (author)

  5. Model environmental assessment for a property-cleanup/interim-storage remedial action at a formerly utilized site

    International Nuclear Information System (INIS)

    Merry-Libby, P.

    1982-07-01

    This document has been prepared as a model for the preparation of an Environmental Assessment (EA) for a property-cleanup/interim-storage type of remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP) of the US Department of Energy (DOE). For major federal actions significantly affecting the quality of the human environment, an Environmental Impact Statement (EIS) must be prepared to aid DOE in making its decision. However, when it is not clear that an action is major and the impacts are significant, an EA may be prepared to determine whether to prepare an EIS or a finding of no significant impact (FONSI). If it is likely that an action may be major and the impacts significant, it is usually more cost-effective and timely to directly prepare an EIS. If it is likely that a FONSI can be reached after some environmental assessment, as DOE believes may be the case for most property-cleanup/interim-storage remedial actions, preparation of site-specific EAs is an effective means of compliance with NEPA

  6. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  7. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  8. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  9. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  10. Assessment report on research and development activities. Activity: 'Advanced science research' (Interim report)

    International Nuclear Information System (INIS)

    2012-11-01

    Japan Atomic Energy Agency (hereinafter referred to as “JAEA”) consulted an assessment committee, “Evaluation Committee of Research Activities for Advanced Science Research” (hereinafter referred to as “Committee”) for interim assessment of “Advanced Science Research,” in accordance with “General Guideline for the Evaluation of Government Research and Development (R and D) Activities” by Cabinet Office, Government of Japan, “Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology” and “Regulation on Conduct for Evaluation of R and D Activities” by JAEA. In response to the JAEA's request, the Committee assessed the research programs and activities of the Advanced Science Research Center (hereinafter referred to as “ASRC”) for the period of two years from April 2010. The Committee evaluated the management and the research programs of the ASRC based on the explanatory documents prepared by the ASRC and the oral presentations with questions-and-answers by the Director and the research group leaders. This report summarizes the result of the assessment by the Committee with the Committee report attached from page 7. (author)

  11. DEVELOPMENT OF THERAPEUTIC STRATEGIES FOR OBESITY AND COMORBID DISORDERS BASED ON OBSERVATIONAL PROGRAMS: INTERIM RESULTS OF THE RUSSIAN OBSERVATIONAL PROGRAM PRIMAVERA

    Directory of Open Access Journals (Sweden)

    E. A. Troshina

    2015-01-01

    Full Text Available Aim: To assess interim results of the Russian observational program PrimaVera on efficacy and safety sibutramine (Reduxin® for treatment of obesity within routine medical practice. Materials and methods: This multicenter observational program included patients with obesity aged below 65  years, excluding those with uncontrolled arterial hypertension, coronary heart disease, heart failure and cerebrovascular disease. All patients were administered sibutramine for treatment of their obesity. During out-patient follow-up visits, physicians assessed changes in patients’ body mass, blood pressure and heart rate, as well as registered adverse events. Maximal treatment duration was 12 months. In this report, the results from 16  515  patients are analyzed, 82% of whom (n=13 192 were females.Results: After 3  months of treatment body mass index (BMI decreased by 2.81±1.0  kg/m², after 6 months, by 5.17±2.15 kg/m². At 12 months decrease in BMI was 1.3-fold higher compared to 6  months’ results and amounted to 6.76±2.93  kg/m². Reduction of body mass with longterm (above 6  months treatment with sibutramine under supervision of a physician was associated with a decrease in systolic and diastolic blood pressure levels (by 4.1 mm Hg, in both cases and did not lead to an increase in heart rate (Δ=-1.02  bpm. Based on data from 16  515  medical records processed up to now, 397  episodes of adverse events were registered, with none of them being serious.Conclusion: This interim results of the program PrimaVera confirmed favorable safety profile of Reduxin® and its high efficacy in the treatment of obesity.

  12. Seismic Safety Margins Research Program. Phase I. Interim definition of terms

    International Nuclear Information System (INIS)

    Smith, P.D.; Dong, R.G.

    1980-01-01

    This report documents interim definitions of terms in the Seismic Safety Margins Research Program (SSMRP). Intent is to establish a common-based terminology integral to the probabilistic methods that predict more realistically the behavior of nuclear power plants during an earthquake. These definitions are a response to a request by the Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards at its meeting held November 15-16, 1979

  13. Lamar Low-Level Jet Program Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, N.; Shirazi, M.; Jager, D.; Wilde, S.; Adams, J.; Buhl, M.; Sullivan, P.; Patton, E.

    2004-01-01

    This interim report presents the results to date from the Lamar Low-Level Jet Program (LLLJP) that has been established as joint effort among the U.S. Department of Energy (DOE), the National Wind Technology Center (NWTC) of the National Renewable Energy Laboratory (NREL), and General Electric Wind Energy (GE Wind). The purpose of this project is to develop an understanding of the influence of nocturnal low-level jet streams on the inflow turbulence environment and the documenting of any potential operating impacts on current large wind turbines and the Low Wind Speed Turbine (LWST) designs of the future. A year's record of detailed nocturnal turbulence measurements has been collected from NREL instrumentation installed on the GE Wind 120-m tower in southeastern Colorado and supplemented with mean wind profile data collected using an acoustic wind profiler or SODAR (Sound Detection and Ranging). The analyses of measurements taken as part of a previous program conducted at the NWTC have been used to aid in the interpretation of the results of representative case studies of data collected from the GE Wind tower.

  14. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  15. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  16. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 1

    International Nuclear Information System (INIS)

    Wuschke, D.M.; Gillespie, P.A.; Main, D.E.

    1985-07-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second assessment was performed in 1984 and is documented in the Second Interim assessment of the Canadian Concept for Nuclear Fuel Waste Disposal Volumes 1 to 4. This volume, entitled Summary, is a condensation of Volumes 2, 3 and 4. It briefly describes the Canadian nuclear fuel waste disposal concept, and the methods and results of the second interim pre-closure and post-closure assessments of that concept. 46 refs

  17. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  18. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  19. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  20. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  1. An Assessment of SKB's Performance Assessment Calculations in the Interim Main Report for the Safety Assessment SR-Can

    International Nuclear Information System (INIS)

    Maul, Philip; Robinson, Peter

    2005-03-01

    SKB have published their Interim Main Report of the safety assessment SR-Can, which is intended to establish the framework for what will be submitted in 2006 in support of a licence application for construction of the spent fuel encapsulation plant. This follows on from the SR-Can Planning Document published in 2003. The purpose of the Interim Report is stated to be to demonstrate the methodology that will be used for safety assessment. The present report evaluates the information provided in the Interim SR-Can Report that is relevant to the Performance Assessment (PA) calculations that SKB intend to undertake, using independent calculations to facilitate this process. SKB consider that the primary safety function is to isolate completely the fuel within the canisters over the entire assessment period. Should a canister be damaged, the secondary safety function is to ensure that any release is retarded and dispersed sufficiently to ensure that concentrations levels in the accessible environment cannot cause unacceptable consequences. In this report PA calculations are considered to include both a high-level representation of the evolution of the system (relevant to the primary safety function), and any subsequent radionuclide transport (relevant to the secondary safety function). The main conclusions drawn are: 1. The effects of climate evolution on engineered barriers have not been analysed in detail in the Interim Report, and this limits the usefulness of the preliminary calculations that have been undertaken. 2. A key aspect of SKB's approach is the use of an integrated near-field evolution model. The information provided on this model demonstrates its capability efficiently to reproduce calculations from individual process models, but insufficient information is given at the present time to justify statements about interactions between processes. In particular it is assumed that relatively short term thermal and resaturation processes do not affect the

  2. Assessment report of research and development activities. Activity: advanced science research' (Interim report)

    International Nuclear Information System (INIS)

    2008-08-01

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') consults an assessment committee, 'Evaluation Committee of Research Activities for Advanced Science Research' (hereinafter referred to as 'Committee') for interim assessment of 'Advanced Science Research,' in accordance with General Guideline for the Evaluation of Government Research and Development (R and D) Activities' by Cabinet Office, Government of Japan, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response to the JAEA's request, the Committee assessed the research program of the Advanced Science Research Center (hereinafter referred to as 'ASRC') during the period of two years from October 2005 to September 2007. The Committee evaluated the management and research activities of the ASRC based on the explanatory documents prepared by the ASRC, the oral presentations with questions-and-answers by the Director and the research group leaders, and interviews from group members through on-site visits by the Committee members. One CD-ROM is attached as an appendix. (J.P.N.)

  3. Results from the Interim Salt Disposition Program Macrobatch 11 Tank 21H Acceptance Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

  4. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  5. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  6. 1998 interim 242-A Evaporator tank system integrity assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  7. 1998 interim 242-A Evaporator tank system integrity assessment report

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ''dangerous waste storage or treatment tank and its ancillary equipment and containment.'' This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD

  8. Long Term Inactive Well Program requirements : interim directive ID 97-08

    International Nuclear Information System (INIS)

    1997-01-01

    The Alberta Energy and Utilities Board and the petroleum industry have agreed that industry must take proactive measures to reduce the number of long term inactive wells in Alberta. This interim directive outlines the requirements of the Long Term Inactive Well Program, and provides a schedule for industry to reduce the number of inactive wells. EUB estimates that there are currently 35,000 inactive wells in Alberta, 10,000 of which have been inactive for more than 10 consecutive years. These wells pose a financial risk to the Abandonment Fund which was established to help fund the abandonment of orphan wells. The Long Term Inactive Well Program was created based on the recommendations of a joint government/industry committee, and will operate for five years. 5 tabs

  9. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Science.gov (United States)

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  10. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

  11. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    International Nuclear Information System (INIS)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants

  12. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  13. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  14. Interim reliability evaluation program: analysis of the Arkansas Nuclear One. Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kolb, G.J.; Kunsman, D.M.; Bell, B.J.

    1982-06-01

    This report represents the results of the analysis of Arkansas Nuclear One (ANO) Unit 1 nuclear power plant which was performed as part of the Interim Reliability Evaluation Program (IREP). The IREP has several objectives, two of which are achieved by the analysis presented in this report. These objectives are: (1) the identification, in a preliminary way, of those accident sequences which are expected to dominate the public health and safety risks; and (2) the development of state-of-the-art plant system models which can be used as a foundation for subsequent, more intensive applications of probabilistic risk assessment. The primary methodological tools used in the analysis were event trees and fault trees. These tools were used to study core melt accidents initiated by loss of coolant accidents (LOCAs) of six different break size ranges and eight different types of transients

  15. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  16. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  17. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan; Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report

  18. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    International Nuclear Information System (INIS)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.; Trainer, J.E.; Bertucio, R.C.; Leahy, T.J.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models and probabilities; and generic control circuit analyses

  19. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  20. Methods for assessing environmental impacts of a FUSRAP property-cleanup/interim-storage remedial action

    International Nuclear Information System (INIS)

    Wyman, D.J.

    1982-12-01

    This document provides a description of a property-cleanup/interim-storage action, explanation of how environmental impacts might occur, comprehensive treatment of most potential impacts that might occur as a result of this type of action, discussion of existing methodologies for estimating and assessing impacts, justification of the choice of specific methodologies for use in FUSRAP environmental reviews, assessments of representative impacts (or expected ranges of impacts where possible), suggested mitigation measures, and some key sources of information. The major topical areas covered are physical and biological impacts, radiological impacts, and socioeconomic impacts. Some project-related issues were beyond the scope of this document, including dollar costs, specific accident scenarios, project funding and changes in Congressional mandates, and project management (contracts, labor relations, quality assurance, liability, emergency preparedness, etc.). These issues will be covered in other documents supporting the decision-making process. Although the scope of this document covers property-cleanup and interim-storage actions, it is applicable to other similar remedial actions. For example, the analyses discussed herein for cleanup activities are applicable to any FUSRAP action that includes site cleanup

  1. Assessment report of research and development activities. Activity: 'Nuclear science and engineering research' (Interim report)

    International Nuclear Information System (INIS)

    2013-11-01

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') consults an assessment committee, 'Evaluation Committee of Research Activities for Nuclear Science and Engineering' (hereinafter referred to as 'Committee') for interim assessment of 'Nuclear Science and Engineering,' in accordance with 'General Guideline for the Evaluation of Government Research and Development (R and D) Activities' by Cabinet Office, Government of Japan, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by the JAEA. In response to the JAEA's request, the Committee assessed the research program of the Nuclear Science and Engineering Directorate (hereinafter referred to as 'NSED') and Center for Computational Science and e-Systems (hereinafter referred to as 'CCSE') during the period of about four years from September 2008 to September 2012. The Committee evaluated the management and research activities of the NSED and the CCSE based on explanatory documents prepared by the NSED and the CCSE, and oral presentations with questions-and-answers by unit managers etc. A CD-ROM is attached as an appendix. (J.P.N.)

  2. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8

  3. Interim main report of the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Hedin, Allan

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10 -6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  4. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    International Nuclear Information System (INIS)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs

  5. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs.

  6. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  7. Assessment report of research and development activities in FY2006 activity. 'Fast reactor cycle technology development project' (Interim report)

    International Nuclear Information System (INIS)

    2007-08-01

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') asked the advisory committee 'evaluation Committee of Research and Development (R and D) Activities for Advanced Nuclear System/Nuclear Fuel Cycle Technology' (hereinafter referred to as 'Committee') to assess the interim report on Fast Reactor Cycle Technology Development Project ' (former 'Feasibility Study on Commercialized Fast Reactor Cycle Systems') in FY2006, in accordance with 'General Guideline for the Evaluation of Government R and D Activities' by Japanese Cabinet Office, 'Guideline for Evaluation of R and D in Ministry of Education, Culture Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response to JAEA's request, the Committee assessed the R and D program over five years, the criteria for adoption judgment on innovative technologies at the end of 2010 (Project Review), and the organization structure for R and D. etc. (Management Review). As a result of review, the Committee concluded that this R and D program and its organization structure are almost reasonable. (author)

  8. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  9. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  10. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  11. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  12. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  13. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Data Report No. 1

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-08-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim data report summarizes results as of August, 1999, on the status of the test programs being conducted on three technologies: lean-NO{sub x} catalysts, diesel particulate filters and diesel oxidation catalysts.

  14. Department of Energy Plutonium ES ampersand H Vulnerability Assessment Savannah River Site interim compensatory measures

    International Nuclear Information System (INIS)

    Bickford, W.E.

    1994-01-01

    The Savannah River Site (SRS) has recently completed a self-assessment of potential vulnerabilities associated with plutonium and other transuranic materials stored at the site. An independent Working Group Assessment Team (WGAT) appointed by DOE/ES ampersand H also performed an independent assessment, and reviewed and validated the site self-assessment. The purpose of this report is to provide a status of interim compensatory measures at SRS to address hazards in advance of any corrective actions. ES ampersand H has requested this status for all vulnerabilities ranked medium or higher with respect to potential consequences to workers, environment, and the public

  15. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  16. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  17. The NASA cosmic ray program for the 1990's and beyond Interim report of the NASA Cosmic Ray Program Working Group

    International Nuclear Information System (INIS)

    Ahlen, S.P.; Binns, W.R.; Cherry, M.L.; Gaisser, T.K.; Jones, W.V.; Ling, J.C.; Mewaldt, R.A.; Muller, D.; Ormes, J.O.; Ramaty, R.; Stone, E.C.; Waddington, C.J.; Webber, W.R.; Miedenbeck, M.E.

    1990-01-01

    The interim report of the 1989 NASA Cosmic Ray Program Working Group is presented. The report summarizes the cosmic ray program for the 1990's, including the recently approved ACE, Astromag, HNC, POEMS, and SAMPEX missions, as well as other key elements of the program. New science themes and candidate missions are identified for the first part of the 21st Century, including objectives that might be addressed as part of the Human Exploration Initiative. Among the suggested new thrusts for the 21st century are: an Interstellar Probe into the nearby interstellar medium; a Lunar-Based Calorimeter to measure the cosmic ray composition near ∼10 16 eV; high precision element and isotope spectroscopy of ultraheavy (Z≥30) elements; and new, more sensitive, studies of impulsive solar flare events

  18. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  19. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  20. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  1. An Australian Study Comparing the Use of Multiple-Choice Questionnaires with Assignments as Interim, Summative Law School Assessment

    Science.gov (United States)

    Huang, Vicki

    2017-01-01

    To the author's knowledge, this is the first Australian study to empirically compare the use of a multiple-choice questionnaire (MCQ) with the use of a written assignment for interim, summative law school assessment. This study also surveyed the same student sample as to what types of assessments are preferred and why. In total, 182 undergraduate…

  2. Explicit feedback to enhance the effect of an interim assessment: a cross-over study on learning effect and gender difference.

    Science.gov (United States)

    Olde Bekkink, Marleen; Donders, Rogier; van Muijen, Goos N P; de Waal, Rob M W; Ruiter, Dirk J

    2012-11-01

    In a previous study we demonstrated by a prospective controlled design that an interim assessment during an ongoing small group work (SGW) session resulted in a higher score in the course examination. As this reflects the so-called testing effect, which is supposed to be enhanced by feedback, we investigated whether feedback following an interim assessment would have an effect on the score of the course exam, and whether the effect is influenced by the gender of the student. During a General Pathology bachelor course all 386 (bio) medical students took an interim assessment on the topics cell damage (first week) and tumour pathology (fourth week). The intervention consisted of immediate detailed oral feedback on the content of the questions of the interim assessment by the tutor, including the rationale of the correct and incorrect answers. It concerned a prospective randomized study using a cross-over design. Outcome measures were: (1) the difference in the normalized scores (1-10) of the course examination multiple choice questions related to the two topics, (2) effect of gender, and (3) gender-specific scores on formal examination. The effect of feedback was estimated as half the difference in the outcome between the two conditions. Mixed-model analysis was used whereby the SGW group was taken as the study target. The scores of the questions on cell damage amounted to 7.70 (SD 1.59) in the group without and 7.78 (SD 1.39) in the group with feedback, and 6.73 (SD 1.51) and 6.77 (SD 1.60), respectively, for those on tumour pathology. No statistically significant effect of feedback was found: 0.02 on a scale of 1-10 (95 % CI: -0.20; 0.25). There were no significant interactions of feedback with gender. Female students scored 0.43 points higher on the formal examination in comparison with their male colleagues. No additional effect of immediate explicit feedback following an interim assessment during an SGW session in an ongoing bachelor course could be

  3. 75 FR 8412 - Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of...

    Science.gov (United States)

    2010-02-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0047] Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of Accidental Radionuclide Releases; Solicitation of Public... ground water flow and transport of accidental radionuclide releases necessary to demonstrate compliance...

  4. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    2006 French Act provides for a research program on interim storage to be carried out along with the repository project development. This program has been guided by the complementarities between interim storage and the repository project. The main research issues address the longevity of storage facilities, up to 100 years, their versatility with regard to waste package types and their modularity to match future needs progressively. In parallel the dialogue between Andra and waste producers will continue to propose optimized waste management scenarios. (author)

  5. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 4

    International Nuclear Information System (INIS)

    Wuschke, D.M.; Gillespie, P.A.; Mehta, K.K.; Henrich, W.F.; LeNeveu, D.M.; Guvanasen, V.M.; Sherman, G.R.; Donahue, D.C.; Goodwin, B.W.; Andres, T.H.

    1985-12-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second such assessment was performed in 1984 and is documented in the Second Interim Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal - Volumes 1-4. This volume, entitled Post-Closure Assessment, describes the methods, models and data used to perform the second post-closure assessment. The results are presented and their significance is discussed. Conclusions and planned improvements are listed. 72 refs

  6. HTGR market assessment: interim report

    International Nuclear Information System (INIS)

    1979-09-01

    The purpose of this Assessment is to establish the utility perspective on the market potential of the HTGR. The majority of issues and conclusions in this report are applicable to both the HTGR-Gas Turbine (GT) and the HTGR-Steam Cycle (SC). This phase of the HTGR Market Assessment used the HTGR-GT as the reference design as it is the present focus of the US HTGR Program. A brief system description of the HTGR-GT is included in Appendix A. This initial report provides the proposed structure for conducting the HTGR Market Assessment plus preliminary analyses to establish the magnitude and nature of key factors that affect the HTGR market. The HTGR market factors and their relationship to the present HTGR Program are discussed. This report discusses two of these factors in depth: economics and water availability. The water availability situation in the US and its impact on the potential HTGR market are described. The approach for applying the HTGR within a framework of utility systems analyses is presented

  7. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 3

    International Nuclear Information System (INIS)

    Johansen, K.; Donnelly, K.J.; Gee, J.H.; Green, B.J.; Nathwani, J.S.; Quinn, A.M.; Rogers, B.G.; Stevenson, M.A.; Dunford, W.E.; Tamm, J.A.

    1985-12-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second such assessment was completed in 1984 and is documented in the Second Interim Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal - Volumes 1-4. This, the third volume of the report, summarizes the pre-closure environmental and safety assessments completed by Ontario Hydro for Atomic Energy of Canada Limited. The preliminary results and their sigificance are discussed. 85 refs

  8. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  9. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  10. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  11. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  12. Insights from the interim reliability evaluation program pertinent to reactor safety issues

    International Nuclear Information System (INIS)

    Carlson, D.D.

    1983-01-01

    The Interim Reliability Evaluation Program (IREP) consisted of concurrent probabilistic analyses of four operating nuclear power plants. This paper presents and integrated view of the results of the analyses drawing insights pertinent to reactor safety. The importance to risk of accident sequences initiated by transients and small loss-of-coolant accidents was confirmed. Support systems were found to contribute significantly to the sets of dominant accident sequences, either due to single failures which could disable one or more mitigating systems or due to their initiating plant transients. Human errors in response to accidents also were important risk contributors. Consideration of operator recovery actions influences accident sequence frequency estimates, the list of accident sequences dominating core melt, and the set of dominant risk contributors. Accidents involving station blackout, reactor coolant pump seal leaks and ruptures, and loss-of-coolant accidents requiring manual initiation of coolant injection were found to be risk significant

  13. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 2

    International Nuclear Information System (INIS)

    Gillespie, P.A.; Wuschke, D.M.; Guvanasen, V.M.; Mehta, K.K.; McConnell, D.B.; Tamm, J.A.; Lyon, R.B.

    1985-12-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the burial of corrosion-resistant containers of waste in a vault located deep in plutonic rock in the Canadian Shield. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluatin of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have if the concept were implemented. The second assessment was performed in 1984 and is documented in Second Interim Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal - Volumes 1 to 4. This volume, entitled Background, discusses Canadian nuclear fuel wastes and the desirable features of a waste disposal method. It outlines several disposal options being considered by a number of countries, including the option chosen for development and assessment in Canada. The reference disposal systems assumed for the second assessment are described, and the approach used for concept assessment is discussed briefly. 79 refs

  14. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  15. The JAERI program for development of safety assessment models and acquisition of data needed for assessment of geological disposal of high-level radioactive wastes

    International Nuclear Information System (INIS)

    Matsuzuru, H.

    1991-01-01

    The JAERI is conducting R and D program for the development of safety assessment methodologies and the acquisition of data needed for the assessment of geologic disposal of high-level radioactive wastes, aiming at the elucidation of feasibility of geologic disposal in Japan. The paper describes current R and D activities to develop interim versions of both a deterministic and a probabilistic methodologies based on a normal evolution scenario, to collect data concerning engineered barriers and geologic media through field and laboratory experiments, and to validate the models used in the methodologies. 2 figs., 2 refs

  16. Indiana application for interim authorization, phase I, hazardous waste management program--Environmental Protection Agency. Notice of public hearing and public comment period.

    Science.gov (United States)

    1982-04-12

    EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.

  17. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  18. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  19. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  20. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  1. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  2. Explicit feedback to enhance the effect of an interim assessment: a cross-over study on learning effect and gender difference

    NARCIS (Netherlands)

    Olde Bekkink, M.; Donders, R.; van Muijen, G.N.; de Waal, R.M.; Ruiter, D.J.

    2012-01-01

    In a previous study we demonstrated by a prospective controlled design that an interim assessment during an ongoing small group work (SGW) session resulted in a higher score in the course examination. As this reflects the so-called testing effect, which is supposed to be enhanced by feedback, we

  3. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Science.gov (United States)

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  4. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Science.gov (United States)

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (pinstitution in the country increased.

  5. Assessment report of research and development activities in JFY2008 activity. 'Fast Reactor Cycle Technology Development Project' (Interim report)

    International Nuclear Information System (INIS)

    2009-08-01

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') asked the advisory committee 'Evaluation Committee of Research and Development Activities for Advanced Nuclear System/Nuclear Fuel Cycle Technology' (hereinafter referred to as 'Committee') to assess the interim report on 'Fast Reactor Cycle Technology Development Project (FaCT project)' in JFY2008, in accordance with 'General Guideline for the Evaluation of Government R and D Activities' by Japanese Cabinet Office, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response of JAEA's request, the Committee assessed the 2006-2008 R and D results, the 2009-2010 R and D program and its R and D management. The Committee confirmed the progress status of the R and D for the adoption judgment on innovative technologies scheduled in 2010. As a result of the review, the committee has made suggestions for the future R and D plan and the improvements of the R and D organization structure/management. A CD-ROM is attached as an appendix. (J.P.N.)

  6. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  7. Routine interim disease assessment in patients undergoing induction chemotherapy for acute myeloid leukemia: Can we do better?

    Science.gov (United States)

    Campuzano-Zuluaga, Germán; Deutsch, Yehuda; Salzberg, Matthew; Gomez, Alexandra; Vargas, Fernando; Elias, Roy; Kwon, Deukwoo; Goodman, Mark; Ikpatt, Offiong F; Chapman, Jennifer R; Watts, Justin; Vega, Francisco; Swords, Ronan

    2016-03-01

    The presence of >5% blasts at "day 14" (D14), in patients undergoing induction chemotherapy for acute myeloid leukemia (AML) is problematic. It is unclear if a second course of chemotherapy for early persistent disease will alter outcome in these patients. We conducted a retrospective study of AML patients undergoing induction chemotherapy where diagnostic, interim (around day 14), and recovery (days 21-42) bone marrow (BM) evaluations were available for review. Of the 113 patients included in the final analysis, 99 (87.6%) achieved CR at hematologic recovery. At D14, 90 patients (79.6%) had 5% blasts). Of these, 11 (47.8%) received a second course of chemotherapy (double induction [DI]) and 12 (52.2%) were observed until count recovery (single induction [SI]). No significant difference in CR rates was observed between these two groups (58.3% DI group vs. 45.5% SI group, P value = 0.684). In our analysis, D14 BM evaluation did not uniformly identify patients with primary induction failure. To unequivocally determine the value of a D14 marrow assessment in AML, prospective studies in the context of large cooperative group trials are required. Considering our findings and similar reports from others, we propose that D14 marrow assessment should be individualized, and that other factors, such as cytogenetics and early peripheral blood blast clearance should be considered, to identify patients most likely to benefit from interim disease assessment during AML induction therapy. © 2015 Wiley Periodicals, Inc.

  8. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  9. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  10. Interim guidance risk assessment of the device assembly facility at the Nevada test site

    International Nuclear Information System (INIS)

    Altenbach, T.J.

    1996-05-01

    The risks of plutonium dispersal and/or high explosive detonation from nuclear explosive operations at the Device Assembly Facility were examined in accordance with DOE Order 5610.11 and the Interim Guidance. The assessment consisted of a qualitative task and hazards analysis, and a quantitative risk screening. Results are displayed on risk matrices for the major types of operations. Most accident scenarios were considered to have Low risk; a few scenarios have Moderate risk; and none have High risk. The highest risk scenarios (Moderate category) consist of a high explosive detonation during assembly operations in a cell, with bare conventional high explosive surrounding the pit

  11. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan [Swedish Radiation Protection Authority, Stockholm (Sweden); Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report.

  12. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  13. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  14. Reducing Health Services for Refugees Through Reforms to the Interim Federal Health Program

    Directory of Open Access Journals (Sweden)

    Andrew C. Stevenson

    2018-04-01

    Full Text Available Since 1957 the Interim Federal Health Program (IFHP has provided temporary health care coverage to refugees and refugee claimants, but in 2012 the Conservative government reformed the IFHP, reducing, or eliminating access to health services for these groups. The government framed the changes around fairness and safety, stating that it would save tax payers $100 million over five years, reduce incentive for migrants with unfounded refugee claims from coming to Canada, protect public health and safety, and defend the integrity of the immigration system. With a Conservative majority, the reform was easily implemented despite a lack of evidence supporting these claims. In 2014, the Federal Court rejected the government's notion of fairness and safety, ruling that the cuts were cruel and unusual treatment of an already vulnerable population. The government appealed this ruling but, in 2016, the Liberals took power and restored funding to the IFHP to pre-2012 levels. Ad hoc evaluations predicted inequitable and adverse impacts on refugees, negative impacts on health, and increased costs to refugees, provincial governments, and health providers. Overall the threats and weaknesses of this reform clearly outweighed the few and unconvincing opportunities and strengths of the program, leading to its demise.

  15. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  16. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  17. Interim assessment of the experience of fast neutron therapy in Edinburgh

    International Nuclear Information System (INIS)

    Duncan, W.; Arnott, S.J.

    1982-01-01

    Clinical studies of fast neutron therapy were started in Edinburgh in March 1977. The treatment facility has an isocentric machine and a fixed horizontal beam. The neutron beam is produced by 15 MeV deuterons on a thick beryllium target. Six hundred and forty-one patients have been included in these studies in the four-year period to March 1981. Randomly controlled trials have been conducted since May 1977 and 376 patients have been recruited in this period. The local tumor response rates and morbidity observed is given for trials of patients with cerebral gliomass, squamous carcinoma of the head and neck region, transitional cell carcinoma of the bladder and adenocarcinoma of the rectum. This interim evaluation does not demonstrate any advantage of fast neutron radiotherapy as compared with photon therapy. However, greater numbers of patients require to be studied and followed-up for longer intervals. A definitive assessment of the randomly controlled clinical trials in Edinburgh should be possible at the end of 1982

  18. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  19. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  20. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    Directory of Open Access Journals (Sweden)

    M. André

    2011-01-01

    Full Text Available FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials.

  1. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  2. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  3. 1987 Federal interim storage fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  4. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  5. Unit cell modeling in support of interim performance assessment for low level tank waste disposal

    International Nuclear Information System (INIS)

    Kline, N.W.

    1996-01-01

    A unit cell model is used to simulate the base analysis case and related sensitivity cases for the interim performance assessment of low level tank waste disposal. Simulation case results are summarized in terms of fractional contaminant release rates to the vadose zone and to the water table at the unconfined aquifer. Results suggest that the crushed glass water conditioning layer at the top of the facility and the chemical retardation pad at the bottom of the facility can be important components of the facility. Results also suggest that the release rates to the water table are dominated by the release rate from the waste form

  6. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  7. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  8. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  9. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  10. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  11. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  12. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  13. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  14. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  15. Progress and future direction for the interim safe storage and disposal of Hanford high level waste (HLW)

    International Nuclear Information System (INIS)

    Wodrich, D.D.

    1996-01-01

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the US DOE and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described

  16. Interim Evaluation of the Project P.A.T.H.S.: Findings Based on Different Datasets

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available Interim evaluation studies were carried out in order to examine the implementation details of the Tier 1 Program of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes in Hong Kong. Quantitative results of the interim evaluation findings based on eight datasets collected from 2006 to 2009 are reported in this paper. Three hundred and seventy-eight schools were randomly selected to provide information on the implementation details of the program via face-to-face interviews, telephone interviews, and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. In conjunction with other process evaluation findings, the present study suggests that the implementation quality of the Tier 1 Program of the Project P.A.T.H.S. is high. The present study also provides support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  17. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  18. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  19. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  20. Interim analysis: A rational approach of decision making in clinical trial.

    Science.gov (United States)

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  1. Interim analysis: A rational approach of decision making in clinical trial

    Directory of Open Access Journals (Sweden)

    Amal Kumar

    2016-01-01

    Full Text Available Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  2. 24 CFR 982.516 - Family income and composition: Regular and interim examinations.

    Science.gov (United States)

    2010-04-01

    ... VOUCHER PROGRAM Rent and Housing Assistance Payment § 982.516 Family income and composition: Regular and... assistance payment. (For a voucher tenancy, the housing assistance payment shall be calculated in accordance... the housing assistance payment resulting from an interim redetermination. (2) At the effective date of...

  3. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  4. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  5. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  6. Environmental Assessment Radioactive Source Recovery Program

    International Nuclear Information System (INIS)

    1995-01-01

    In a response to potential risks to public health and safety, the U.S. Department of Energy (DOE) is evaluating the recovery of sealed neutron sources under the Radioactive Source Recovery Program (RSRP). This proposed program would enhance the DOE's and the U.S. Nuclear Regulatory Commission's (NRC's) joint capabilities in the safe management of commercially held radioactive source materials. Currently there are no federal or commercial options for the recovery, storage, or disposal of sealed neutron sources. This Environmental Assessment (EA) analyzes the potential environmental impacts that would be expected to occur if the DOE were to implement a program for the receipt and recovery at the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico, of unwanted and excess plutonium-beryllium ( 238 Pu-Be) and americium-beryllium ( 241 Am-Be) sealed neutron sources. About 1 kg (2.2 lb) plutonium and 3 kg (6.6 lb) americium would be recovered over a 15-year project. Personnel at LANL would receive neutron sources from companies, universities, source brokers, and government agencies across the country. These neutron sources would be temporarily stored in floor holes at the CMR Hot Cell Facility. Recovery reduces the neutron emissions from the source material and refers to a process by which: (1) the stainless steel cladding is removed from the neutron source material, (2) the mixture of the radioactive material (Pu-238 or Am-241) and beryllium that constitutes the neutron source material is chemically separated (recovered), and (3) the recovered Pu-238 or Am-241 is converted to an oxide form ( 238 PuO 2 or 241 AmO 2 ). The proposed action would include placing the 238 PuO 2 or 241 AmO 2 in interim storage in a special nuclear material vault at the LANL Plutonium Facility

  7. Development of stiring engines for wide use and its interim assessment

    Energy Technology Data Exchange (ETDEWEB)

    Yamashita, Iwao

    1987-03-05

    This study is intended to introduce the present condition of the R/D on Stirling engines under the Moonlight Project forming a part of the research and development funded by NEDO, and mainly the stress is laid on the progress subsequent to the interim assessment whence the utilization system has been developed. The development of stirling engines in Europe and America, at present is centered on the development of autmobile engines by United Sterling Company (USAB) in Sweden and the US Department of Energy (DOE) in USA. In Japan, a real research and development has so far been limited to Aishin Seiki (Aishin Precision Industry) only. However, taking the opportunity of the start of the R/D by the Moonlight Project, the number of makers entering the development increased rapidly and in terms of performance, their products are non on the European and American level. In this project, besides the development of an engine itself and also of its utilization system, the low pollution and endurance characteristics were dealt with, and the uniform tests are being performed. This is an epoc-making event, unprecedented in the world. (8 figs, 1 tab)

  8. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  9. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  10. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  11. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  12. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  13. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  14. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  15. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  16. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  17. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  18. German Approach for the Transport of Spent Fuel Packages after Interim Storage

    International Nuclear Information System (INIS)

    Wille, Frank; Wolff, Dietmar; Droste, Bernhard; Voelzke, Holger

    2014-01-01

    In Germany the concept of dry interim storage of spent nuclear fuel in dual purpose metal casks is implemented, currently for periods of up to 40 years. The casks being used have an approved package design in accordance with the international transport regulations. The license for dry storage is granted on the German Atomic Energy Act with respect to the recently (in 2012) revised 'Guidelines for dry cask storage of spent nuclear fuel and heat-generating waste' by the German Waste management Commission (ESK) which are very similar to the former RSK (reactor safety commission) guidelines. For transport on public routes between or after long term interim storage periods, it has to be ensured that the transport and storage casks fulfil the specifications of the transport approval or other sufficient properties which satisfy the proofs for the compliance of the safety objectives at that time. In recent years the validation period of transport approval certificates for manufactured, loaded and stored packages were discussed among authorities and applicants. A case dependent system of 3, 5 and 10 years was established. There are consequences for the safety cases in the Package Design Safety Report including evaluation of long term behavior of components and specific operating procedures of the package. Present research and knowledge concerning the long term behavior of transport and storage cask components have to be consulted as well as experiences from interim cask storage operations. Challenges in the safety assessment are e.g. the behavior of aged metal and elastomeric seals under IAEA test conditions to ensure that the results of drop tests can be transferred to the compliance of the safety objectives at the time of transport after the interim storage period (aged package). Assessment methods for the material compatibility, the behavior of fuel assemblies and the aging behavior of shielding parts are issues as well. This paper describes the state

  19. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  20. 76 FR 19909 - International Terrorism Victim Expense Reimbursement Program

    Science.gov (United States)

    2011-04-11

    ... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...

  1. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  2. Comparative risk assessments for the production and interim storage of glass and ceramic waste forms: defense waste processing facility

    International Nuclear Information System (INIS)

    Huang, J.C.; Wright, W.V.

    1982-04-01

    The Defense Waste Processing Facility (DWPF) for immobilizing nuclear high level waste (HLW) is scheduled to be built at the Savannah River Plant (SRP). High level waste is produced when SRP reactor components are subjected to chemical separation operations. Two candidates for immobilizing this HLW are borosilicate glass and crystalline ceramic, either being contained in weld-sealed stainless steel canisters. A number of technical analyses are being conducted to support a selection between these two waste forms. The present document compares the risks associated with the manufacture and interim storage of these two forms in the DWPF. Process information used in the risk analysis was taken primarily from a DWPF processibility analysis. The DWPF environmental analysis provided much of the necessary environmental information. To perform the comparative risk assessments, consequences of the postulated accidents are calculated in terms of: (1) the maximum dose to an off-site individual; and (2) the dose to off-site population within 80 kilometers of the DWPF, both taken in terms of the 50-year inhalation dose commitment. The consequences are then multiplied by the estimated accident probabilities to obtain the risks. The analyses indicate that the maximum exposure risk to an individual resulting from the accidents postulated for both the production and interim storage of either waste form represents only an insignificant fraction of the natural background radiation of about 90 mrem per year per person in the local area. They also show that there is no disaster potential to the off-site population. Therefore, the risks from abnormal events in the production and the interim storage of the DWPF waste forms should not be considered as a dominant factor in the selection of the final waste form

  3. Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill

    International Nuclear Information System (INIS)

    Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

    1989-07-01

    Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs

  4. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Date Report No. 3: Diesel Fuel Sulfur Effects on Particulate Matter Emissions

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-11-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim report covers the effects of diesel fuel sulfur level on particulate matter emissions for four technologies.

  5. Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-12-08

    The U. S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the

  6. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  7. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Directory of Open Access Journals (Sweden)

    Andrea Evans

    Full Text Available INTRODUCTION: On June 30, 2012, Interim Federal Health Program (IFHP funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. METHODS: We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. RESULTS: There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001. INTERPRETATION: After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  8. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  9. Waste resources utilization program. Interim report, June 30, 1976

    International Nuclear Information System (INIS)

    1976-07-01

    This is an interim report on the effects of the combined use of heat and ionizing radiation (thermoradiation) as a treatment for ridding sewage sludge of pathogenic organisms as well as its effect on the physical-chemical properties. This activity couples two major environmental problems, disposition of human and of nuclear waste, in an attempt to provide a framework in which both will become useful resources. This combined treatment might be chosen to inactivate both heat labile (but possibly radiation resistant) and radiation labile (but possibly heat resistant) organisms. The cost-effective analyses of such a treatment are being examined. Sludge treated with thermoradiation offers considerable potential for use as a fertilizer in agriculture or a soil conditioner for land reclamation free of the potential health hazards associated with conventional methods of land disposal. Treated sludge may also provide a low-cost substitute for high-nutritional components in ruminant diets

  10. Poor predictive value of positive interim FDG-PET/CT in primary mediastinal large B-cell lymphoma

    Energy Technology Data Exchange (ETDEWEB)

    Lazarovici, Julien; Petrovanu, Cynthia; Danu, Alina; Ferme, Christophe; Ribrag, Vincent; Ghez, David [Gustave Roussy, Villejuif (France). Dept. of Hematology; Paris Saclay Univ., Saint-Aubin (France); Terroir, Marie [Gustave Roussy, Villejuif (France). Dept. of Nuclear Medicine and Endocrine Oncology; Paris Saclay Univ., Saint-Aubin (France); Arfi-Rouche, Julia [Gustave Roussy, Villejuif (France). Dept. of Radiology; Paris Saclay Univ., Saint-Aubin (France); Michot, Jean-Marie [Gustave Roussy, Villejuif (France). Dept. of Drug Development (DITEP); Paris Saclay Univ., Saint-Aubin (France); Mussot, Sacha; Florea, Valentina [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Thoracic Surgery; Ghigna, Maria-Rosa [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Pathology; Dartigues, Peggy [Gustave Roussy, Villejuif (France). Dept. of Pathology; Paris Saclay Univ., Saint-Aubin (France)

    2017-11-15

    Though commonly used to assess response to therapy, the prognostic value of interim FDG-PET/CT in Primary Mediastinal Large B-cell Lymphoma (PMBCL) is unclear. We conducted a retrospective study on 36 consecutive patients treated at our institution for a PMBCL between 2006 and 2014. All patients with a positive interim FDG-PET/CT had undergone histological restaging consisting either in a surgical debulking of the residual lesion (15 patients) or a CT-guided core needle biopsy (two patients). All FDG-PET/CT were secondarily reviewed according to the more recent Deauville criteria. Interim FDG-PET/CT was considered positive in 17/36 patients using visual evaluation. Among these patients, 14 had a Deauville score of 4. Histological restaging was negative in all but one case, showing inflammation and/or fibrosis. After a median follow-up of 48.5 months, a total of five patients have relapsed, two patients in the positive FDG-PET/CT group, and three patients in the negative FDG-PET/CT group, respectively. These data indicate that a positive interim FDG-PET/CT does not reflect persistence of active disease in the vast majority of PMBCL cases. The relapse rate appears similar regardless of interim FDG-PET/CT results and interpretation criteria. This suggests that interim FDG-PET/CT has a poor positive predictive value, thus kt should be used with caution in PMBCL. (orig.)

  11. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  12. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  13. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    Science.gov (United States)

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  14. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  15. Application of NUREG/CR-5999 interim fatigue curves to selected nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Morton, D.K.; Nitzel, M.E.

    1995-03-01

    Recent test data indicate that the effects of the light water reactor (LWR) environment could significantly reduce the fatigue resistance of materials used in the reactor coolant pressure boundary components of operating nuclear power plants. Argonne National Laboratory has developed interim fatigue curves based on test data simulating LWR conditions, and published them in NUREG/CR-5999. In order to assess the significance of these interim fatigue curves, fatigue evaluations of a sample of the components in the reactor coolant pressure boundary of LWRs were performed. The sample consists of components from facilities designed by each of the four U.S. nuclear steam supply system vendors. For each facility, six locations were studied, including two locations on the reactor pressure vessel. In addition, there are older vintage plants where components of the reactor coolant pressure boundary were designed to codes that did not require an explicit fatigue analysis of the components. In order to assess the fatigue resistance of the older vintage plants, an evaluation was also conducted on selected components of three of these plants. This report discusses the insights gained from the application of the interim fatigue curves to components of seven operating nuclear power plants

  16. Fire fighting capability assessment program Darlington NGS

    International Nuclear Information System (INIS)

    1995-05-01

    This is a report on the completion of work relating to the assessment of the capability of Darlington NGS to cope with a large fire incident. This included an evaluation of an exercise scenario that would simulate a large fire incident and of their fire plans and procedures which became the subject of interim reports as part of the process of preparing for the fire fighting and rescue exercise. Finally the execution of fire plans by Darlington Nuclear Generating Station (NGS), as demonstrated by their application of human and material resources during a simulated large fire, was observed. 1 tab., 1 fig

  17. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  18. 75 FR 70083 - Emergency Forest Restoration Program and Emergency Conservation Program

    Science.gov (United States)

    2010-11-17

    ... Restoration Program and Emergency Conservation Program AGENCY: Farm Service Agency, USDA. ACTION: Interim rule. SUMMARY: The Farm Service Agency (FSA) is amending regulations as required by the Food, Conservation, and... as follows: PART 701--EMERGENCY CONSERVATION PROGRAM, EMERGENCY FOREST RESTORATION PROGRAM, AND...

  19. Assessment report of research and development on 'geological disposal of high-level radioactive waste' (Interim report)

    International Nuclear Information System (INIS)

    Notoya, Shin; Shimizu, Kazuhiko; Ota, Kunio; Sasao, Eiji

    2010-08-01

    Japan Atomic Energy Agency (JAEA) consulted an assessment committee, 'Evaluation Committee of Research and Development (R and D) Activities for Geological Disposal of High-Level Radioactive Waste', for interim assessment of R and D on high-level radioactive waste disposal in accordance with 'General Guideline for Evaluation of Government R and D Activities' by Cabinet Office, Government of Japan, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by Japan. In response to JAEA's request, the Committee assessed mainly the progress of the R and D project according to guidelines, which addressed the rationale behind the R and D project, the relevance of the project outcome and the efficiency of the project implementation during the period of the first midterm plan. As a result, the Committee concluded that the progress of the R and D project is satisfactory. In addition, the Committee provided a couple of issues and suggestions to be addressed in the implementation of the project during the period of the second midterm. A CD-ROM is attached as an appendix. (J.P.N.)

  20. Interim radiological safety standards and evaluation procedures for subseabed high-level waste disposal

    International Nuclear Information System (INIS)

    Klett, R.D.

    1997-06-01

    The Seabed Disposal Project (SDP) was evaluating the technical feasibility of high-level nuclear waste disposal in deep ocean sediments. Working standards were needed for risk assessments, evaluation of alternative designs, sensitivity studies, and conceptual design guidelines. This report completes a three part program to develop radiological standards for the feasibility phase of the SDP. The characteristics of subseabed disposal and how they affect the selection of standards are discussed. General radiological protection standards are reviewed, along with some new methods, and a systematic approach to developing standards is presented. The selected interim radiological standards for the SDP and the reasons for their selection are given. These standards have no legal or regulatory status and will be replaced or modified by regulatory agencies if subseabed disposal is implemented. 56 refs., 29 figs., 15 tabs

  1. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  2. Heavy-Section Steel Technology program overview

    International Nuclear Information System (INIS)

    Pennell, W.E.

    1990-01-01

    This paper presents a status review of ongoing HSST program tasks aimed at refining the technology used in analysis of reactor pressure vessel fracture margins under pressurized thermal-shock (PTS) loading. Specific fracture-technology issues addressed include vessel flaw density and distribution, shallow flaws, fracture-toughness data transfer, circumferential cracks, ductile tearing and the influence of low-tearing toughness in stainless steel cladding. Preliminary results from the analysis and test programs are presented, together with interim assessments of their potential impact on a reactor vessel PTS analysis. 31 refs., 23 figs., 1 tab

  3. The challenges facing the long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  4. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  5. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  6. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  7. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  8. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  9. International Peer Review of Swedish Nuclear Fuel and Waste Management Company's SR-Can interim report

    International Nuclear Information System (INIS)

    Sagar, Budhi; Bailey, Lucy; Bennett, David G.; Egan, Mike; Roehlig, Klaus

    2004-12-01

    SKB has produced an interim safety assessment report as part of its work to develop a licence application for the construction of a spent nuclear fuel encapsulation plant. The purpose of the interim report is to set out and demonstrate SKB's proposed methodology for long-term safety assessment. The aim of producing an interim report is to allow the Swedish regulatory authorities (SKI and SSI) to review and comment on SKB's proposed methodology before it is used in support of a formal licence application. To help inform their review of SKB's proposed methodology, the authorities appointed an international review team (IRT) to carry out a review of SKB's interim safety assessment report. Comments from the IRT are presented in this document and will be considered by the regulatory authorities in developing their own view of SKB's proposed methodology. The IRT's review included examination of SKB's documentation (the 'Interim Main Report of the Safety Assessment SR-Can' and four supporting documents) and hearings with SKB staff and contractors. The hearings provided an opportunity for the IRT to discuss the SR-Can safety assessment with the authors and contributors to SKB's work. As directed by SKI and SSI, the IRT's review focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology: (i) is fit for the purpose of supporting a licence application; (ii) has a reasonable prospect of leading to a safety assessment that is sufficiently comprehensive, reproducible, traceable and transparent; (iii) is compatible with the authorities' regulations and guidance. No evaluation of long term safety or site acceptability was attempted by the IRT. At the request of SKI and SSI, the IRT's review considered and made recommendations on the following issues: Description of the initial state of the repository and its components; Description of features, events and processes (FEPs) relevant to repository evolution; Strategy for safety

  10. Waste Management Program. Technical progress report, July-December, 1984

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement

  11. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  12. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  13. Quantitative analyses at baseline and interim PET evaluation for response assessment and outcome definition in patients with malignant pleural mesothelioma

    Energy Technology Data Exchange (ETDEWEB)

    Lopci, Egesta; Chiti, Arturo [Humanitas Research Hospital, Nuclear Medicine Department, Rozzano, Milan (Italy); Zucali, Paolo Andrea; Perrino, Matteo; Gianoncelli, Letizia; Lorenzi, Elena; Gemelli, Maria; Santoro, Armando [Humanitas Research Hospital, Oncology, Rozzano (Italy); Ceresoli, Giovanni Luca [Humanitas Gavazzeni, Oncology, Bergamo (Italy); Giordano, Laura [Humanitas Research Hospital, Biostatistics, Rozzano (Italy)

    2015-04-01

    Quantitative analyses on FDG PET for response assessment are increasingly used in clinical studies, particularly with respect to tumours in which radiological assessment is challenging and complete metabolic response is rarely achieved after treatment. A typical example is malignant pleural mesothelioma (MPM), an aggressive tumour originating from mesothelial cells of the pleura. We present our results concerning the use of semiquantitative and quantitative parameters, evaluated at the baseline and interim PET examinations, for the prediction of treatment response and disease outcome in patients with MPM. We retrospectively analysed data derived from 131 patients (88 men, 43 women; mean age 66 years) with MPM who were referred to our institution for treatment between May 2004 and July 2013. Patients were investigated using FDG PET at baseline and after two cycles of pemetrexed-based chemotherapy. Responses were determined using modified RECIST criteria based on the best CT response after treatment. Disease control rate, progression-free survival (PFS) and overall survival (OS) were calculated for the whole population and were correlated with semiquantitative and quantitative parameters evaluated at the baseline and interim PET examinations; these included SUV{sub max}, total lesion glycolysis (TLG), percentage change in SUV{sub max} (ΔSUV{sub max}) and percentage change in TLG (ΔTLG). Disease control was achieved in 84.7 % of the patients, and median PFS and OS for the entire cohort were 7.2 and 14.3 months, respectively. The log-rank test showed a statistically significant difference in PFS between patients with radiological progression and those with partial response (PR) or stable disease (SD) (1.8 vs. 8.6 months, p < 0.001). Baseline SUV{sub max} and TLG showed a statistically significant correlation with PFS and OS (p < 0.001). In the entire population, both ΔSUV{sub max} and ΔTLG were correlated with disease control based on best CT response (p < 0

  14. 78 FR 76160 - Public Housing Assessment System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of...

    Science.gov (United States)

    2013-12-16

    ... System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of Five Points for Occupancy Sub... intended to help lessen the impact of decreases in funding in recent appropriations acts. Adding automatic... to adjust their systems and procedures to the new scoring regime. As a result of automatic across-the...

  15. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    Science.gov (United States)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  16. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  17. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim Program of Inspection Related to Audits of Brokers and Dealers August 18, 2011. I. Introduction On June 21, 2011, the Public... that would be imposed on different categories of registered public accounting firms and classes of...

  18. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  19. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  20. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-26

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

  1. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  2. Specialization-Specific Course Assessments Integrated for Program Assessment

    OpenAIRE

    Qurban A. Memon; Adnan Harb; Shakeel Khoja

    2012-01-01

    The program assessment process combines assessments from individual courses to generate final program assessment to match accreditation benchmarks. In developing countries, industrial environment is not diversified to allow graduating engineers to seek jobs in all disciplines or specializations of an engineering program. Hence, it seems necessary to seek evolution of an engineering program assessment for specialized requirements of the industry. This paper describes how specialization-specifi...

  3. A comparison of the value relevance of interim and annual financial statements

    Directory of Open Access Journals (Sweden)

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  4. 75 FR 21506 - Magnet Schools Assistance Program

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF EDUCATION 34 CFR Part 280 RIN 1855-AA07 [Docket ID ED-2010-OII-0003] Magnet Schools Assistance Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Interim... in the Federal Register an interim final rule and requested comments on that rule for the Magnet...

  5. Waste Management Program. Technical progress report, October-December 1982

    International Nuclear Information System (INIS)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities

  6. Time-dependent crack growth in Alloy 718: An interim assessment

    International Nuclear Information System (INIS)

    James, L.A.

    1982-08-01

    Previous results on the time-dependent nature of fatigue-crack propagation (FCP) in Alloy 718 at elevated temperatures were reviewed. Additional experiments were conducted to further define certain aspects of the time-dependent crack growth behavior. it was found that loading waveform influenced FCP behavior, with tensile hold-times producing higher growth rates than continuous cycling at the same frequency. Crack growth rates under hold-time conditions tended to increase with decreasing grain size. Finally, experiments were conducted which tended to cast some doubt upon the ability of linear-elastic fracture mechanics (LEFM) techniques to characterize cracking behavior in this alloy under hold-time conditions. However, since a superior correlating parameter has not yet been proven, it is suggested that LEFM methods be used in the interim with appropriate safety factors to account for the potential errors. 34 refs., 10 figs., 4 tabs

  7. ETF interim design review

    International Nuclear Information System (INIS)

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  8. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  9. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  10. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  11. 78 FR 79567 - National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods...

    Science.gov (United States)

    2013-12-31

    ... Program: Nutrition Standards for All Foods Sold in Schools as Required by the Healthy, Hunger-Free Kids... interim rule entitled National School Lunch Program and School Breakfast Program: Nutrition Standards for..., 2013 / Rules and Regulations [[Page 79567

  12. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  13. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  14. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  15. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  16. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  17. Use of alternative dispute resolution--HHS. Notice of interim policy.

    Science.gov (United States)

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  18. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  19. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  20. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  1. Interim report on assessment of cable aging for nuclear power plants

    International Nuclear Information System (INIS)

    2006-12-01

    Research on assessment of cable aging for nuclear power plants (NPPs) started in 2002 in order to obtain data of safety-related cables affected by thermal aging, simultaneous thermal and radiation aging, and Loss-of-Coolant Accident (LOCA) equivalent test, which could contribute to draft guideline on comprehensive assessment of cable aging for NPPs while taking into consideration the latest knowledge. For the cable aging test, cross-linked polyethylene, flame-retardant cross-linked polyethylene, ethylene propylene rubber, flame-retardant ethylene propylene rubber, silicone rubber and special heat-resistant polyvinyl chloride insulators were selected from the safety-related cables used in the nuclear power plants. Furthermore, 2 to 3 kinds of cables with insulators of different manufacturers were added making a total of 14 kinds of cable specimens for the test. Aging period was selected as a basic parameter while three temperature conditions for thermal aging specimen and combined nine conditions of three temperatures with three dose rates for simultaneous aging specimens. Degradation of cable aging was characterized by elongation at break of tensile test. LOCA test for 9 kinds of cables was also conducted using the simultaneous aging specimens. Furthermore, the investigation of applicability of non-destructive degradation diagnostic technologies for aged cables was conducted to confirm the validity of cable aging evaluation at actual operating plants. Interim report was issued in 2006 and based on cable aging test until 21,000 hrs maximum; 1) a significant difference might be observed at times in the aging progress depending on the insulator manufacturer even if the insulator type was identical, 2) activation energy values calculated from the thermal aging test data were smaller than those currently used and principles of calculation and application of the activation energy were developed for evaluation and 3) superposition of time dependent data was applicable to

  2. Prognostic value of negative interim 2-["1"8F]-fluoro-2-deoxy-D-glucose PET/CT in diffuse large B-cell lymphoma

    International Nuclear Information System (INIS)

    Kwon, S.H.; Kang, D.R.; Kim, J.; Yoon, J.-K.; Lee, S.J.; Jeong, S.H.; Lee, H.W.; An, Y.-S.

    2016-01-01

    Aim: To assess the prognostic value of negative interim combined 2-["1"8F]-fluoro-2-deoxy-D-glucose ("1"8F-FDG) positron-emission tomography/computed tomography (PET/CT) in patients with diffuse large B-cell lymphoma (DLBCL). Materials and methods: Ninety-two patients with histologically proven DLBCL were enrolled. All of the patients underwent "1"8F-FDG PET/CT at diagnosis, and interim PET/CT after the second cycle of chemotherapy with rituximab, cyclophosphamide, hydroxydaunorubicin, vincristine, and prednisolone (R-CHOP). Negative interim PET/CT was defined as the disappearance of all abnormal "1"8F-FDG uptake compared to the pretreatment PET/CT image, as determined by visual assessment. The clinical outcome of patients was estimated as progression-free survival (PFS), and the prognostic significance of clinicopathological and imaging parameters were assessed using the Cox proportional hazards model. Results: Thirty-six patients (39.1%) showed lymphoma progression within a median follow-up of 30.8 months. According to univariate analysis, Ann Arbor stage, serum lactate dehydrogenase level, Eastern Cooperative Oncology Group scale, International Prognostic Index (IPI) score, and maximum standardised uptake values on initial PET/CT were significant prognostic factors for PFS (all p<0.05). Among these parameters, only the IPI score was an independent predictor for PFS (p=0.044). Survival of patients with a high IPI score (≥3) was poorer than those with a low IPI score (0–2; p<0.001). Conclusion: Despite a negative interim "1"8F-FDG PET/CT, approximately 39% of DLBCL patients showed progression during follow-up. Although the negative PET/CT was obtained during chemotherapy, it is important to closely follow-up patients, especially those with a high IPI score. - Highlights: • About 39% of patients showed progression after negative interim PET/CT. • The IPI score was an independent predictor for PFS. • It is important to closely follow-up with high IPI score

  3. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    Science.gov (United States)

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  4. Overview: Defense high-level waste technology program

    International Nuclear Information System (INIS)

    Shupe, M.W.; Turner, D.A.

    1987-01-01

    Defense high-level waste generated by atomic energy defense activities is stored on an interim basis at three U.S. Department of Energy (DOE) operating locations; the Savannah River Plant in South Carolina, the Hanford Site in Washington, and the Idaho National Engineering Laboratory in Idaho. Responsibility for the permanent disposal of this waste resides with DOE's Office of Defense Waste and Transportation Management. The objective of the Defense High-Level Wast Technology Program is to develop the technology for ending interim storage and achieving permanent disposal of all U.S. defense high-level waste. New and readily retrievable high-level waste are immobilized for disposal in a geologic repository. Other high-level waste will be stabilized in-place if, after completion of the National Environmental Policy Act (NEPA) process, it is determined, on a site-specific basis, that this option is safe, cost effective and environmentally sound. The immediate program focus is on implementing the waste disposal strategy selected in compliance with the NEPA process at Savannah River, while continuing progress toward development of final waste disposal strategies at Hanford and Idaho. This paper presents an overview of the technology development program which supports these waste management activities and an assessment of the impact that recent and anticipated legal and institutional developments are expected to have on the program

  5. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  6. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  7. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  8. Assessment of interim flow water-quality data of the San Joaquin River restoration program and implications for fishes, California, 2009-11

    Science.gov (United States)

    Wulff, Marissa L.; Brown, Larry R.

    2015-01-01

    After more than 50 years of extensive water diversion for urban and agriculture use, a major settlement was reached among the U.S. Departments of the Interior and Commerce, the Natural Resources Defense Council, and the Friant Water Users Authority in an effort to restore the San Joaquin River. The settlement received Federal court approval in October 2006 and established the San Joaquin River Restoration Program, a multi-agency collaboration between State and Federal agencies to restore and maintain fish populations, including Chinook salmon, in the main stem of the river between Friant Dam and the confluence with the Merced River. This is to be done while avoiding or minimizing adverse water supply effects to all of the Friant Division contractors that could result from restoration flows required by the settlement. The settlement stipulates that water- and sediment-quality data be collected to help assess the restoration goals. This report summarizes and evaluates water-quality data collected in the main stem of the San Joaquin River between Friant Dam and the Merced River by the U.S. Bureau of Reclamation for the San Joaquin River Restoration Program during 2009-11. This summary and assessment consider sampling frequency for adequate characterization of variability, sampling locations for sufficient characterization of the San Joaquin River Restoration Program restoration reach, sampling methods for appropriate media (water and sediment), and constituent reporting limits. After reviewing the water- and sediment-quality results for the San Joaquin River Restoration Program, several suggestions were made to the Fisheries Management Work Group, a division of the San Joaquin River Restoration Program that focuses solely on the reintroduction strategies and health of salmon and other native fishes in the river. Water-quality results for lead and total organic carbon exceeded the Surface Water Ambient Monitoring Program Basin Plan Objectives for the San Joaquin Basin

  9. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  10. A links manipulator simulation program interim report

    International Nuclear Information System (INIS)

    Noble, R.A.

    1987-04-01

    A computer program to simulate the performance of the Heysham II rail-following manipulator has been developed. The program is being used to develop and test the rail-following control algorithms which will be used to control movements of the manipulator when it is operating below the gas baffle dome. The simulation includes the dynamic responses of the manipulator joint drives, excluding friction, backlash and compliance. It also includes full details of the manipulator's geometry. A method is given whereby the actual manipulator dynamics can be written into the program once these have been established by measurement. The program is written in FORTRAN and runs on a Perkin-Elmer 3220 mini-computer. The simulation program responds to velocity demands on the individual joints. These will normally come from the control program, in which they will be manually controlled by a joystick. A sigma 5664 colour graphics generator is programmed to display the current position of the manipulator. (UK)

  11. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  12. Sample Results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  13. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, II, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  14. Interim salt disposition program macrobatch 6 tank 21H qualification monosodium titanate and cesium mass transfer tests

    Energy Technology Data Exchange (ETDEWEB)

    Washington, A. L. II; Peters, T. B.; Fink, S. D.

    2013-02-25

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Interim Salt Disposition Program (ISDP) Batch 6 processing. This qualification material was a set of six samples from Tank 21H in October 2012. This sample was used as a real waste demonstration of the Actinide Removal Process (ARP) and the Extraction-Scrub-Strip (ESS) tests process. The Tank 21H sample was contacted with a reduced amount (0.2 g/L) of MST and characterized for strontium and actinide removal at 0 and 8 hour time intervals in this salt batch. {sup 237}Np and {sup 243}Am were both observed to be below detection limits in the source material, and so these results are not reported in this report. The plutonium and uranium samples had decontamination factor (DF) values that were on par or slightly better than we expected from Batch 5. The strontium DF values are slightly lower than expected but still in an acceptable range. The Extraction, Scrub, and Strip (ESS) testing demonstrated cesium removal, stripping and scrubbing within the acceptable range. Overall, the testing indicated that cesium removal is comparable to prior batches at MCU.

  15. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  16. Release of radionuclides following severe accident in interim storage facility. Source term determination

    International Nuclear Information System (INIS)

    Morandi, S.; Mariani, M.; Giacobbo, F.; Covini, R.

    2006-01-01

    Among the severe accidents that can cause the release of radionuclides from an interim storage facility, with a consequent relevant radiological impact on the population, there is the impact of an aircraft on the facility. In this work, a safety assessment analysis for the case of an aircraft crash into an interim storage facility is tackled. To this aim a methodology, based upon DOE, IAEA and NUREG standard procedures and upon conservative yet realistic hypothesis, has been developed in order to evaluate the total radioactivity, source term, released to the biosphere in consequence of the impact, without recurring to the use of complicated numerical codes. The procedure consists in the identification of the accidental scenarios, in the evaluation of the consequent damage to the building structures and to the waste packages and in the determination of the total release of radionuclides through the building-atmosphere interface. The methodology here developed has been applied to the case of an aircraft crash into an interim storage facility currently under design. Results show that in case of perforation followed by a fire incident the total released activity would be greater of some orders of magnitude with respect to the case of mere perforation. (author)

  17. Middle Level Teachers' Perceptions of Interim Reading Assessments: An Exploratory Study of Data-Based Decision Making

    Science.gov (United States)

    Reed, Deborah K.

    2015-01-01

    This study explored the data-based decision making of 12 teachers in grades 6-8 who were asked about their perceptions and use of three required interim measures of reading performance: oral reading fluency (ORF), retell, and a benchmark comprised of released state test items. Focus group participants reported they did not believe the benchmark or…

  18. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  19. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  20. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  1. EFFECT OF REHABILITATION DURING INTERIM STAY IN AALBORG MUNICIPALITY, DENMARK: A STUDY PROTOCOL

    DEFF Research Database (Denmark)

    Villumsen, Sidsel Maria Monrad; Villumsen, Morten

    2016-01-01

    Background: In the municipality of Aalborg, Denmark, the aim is to support citizens’ rehabilitation through training and learning in order to be self-reliant. This effort is supported at interim stays at the nursing homes [1]. A recent external report has outlined that citizen are highly satis ed...... are available in the systems, containing information on rehabilitation services rendered during interim stays. However, available data on the effect of the rehabilitation are currently unstructured in free-text, which impedes the assessment of rehabilitation effect and thereby the quality assurance. Objectives...... on rehabilitation of the citizen. The rehabilitation effect will be extracted from the free-text in the records. The free-text will be categorized into rehabilitation effects of i) deterioration, ii) no effect, iii) effect of rehabilitation, or iv) not possible to classify from the text. Results: This study...

  2. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  3. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  4. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  6. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  7. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  8. Environmental assessment of radiological effluents from data gathering and maintenance operation on Three Mile Island Unit 2: interim criteria approved by the Commission on April 7,1980

    International Nuclear Information System (INIS)

    1980-05-01

    The staff is currently in the process of preparing a programmatic environmental impact statement (PEIS) for TMI-2 which will address all radiological releases that may occur as a result of the cleanup and recovery operations. These operations will begin after the PEIS is published in final form provided the proposed cleanup programs have been found to be environmentally acceptable. In the interim period it is necessary for the licensee to conduct data gathering and maintenance operations on the damaged reactor. The action of approval of these interim operations does not foreclose any of the options of the PEIS. In addition, regardless of what cleanup choice is made in the PEIS, the approval of these data gathering and maintenance operations enhance the ability of the licensee to maintain the reactor in a safe configuration and to plan effectively for recovery operations. This Environmental Impact Appraisal evaluates the effects on the environment of allowing these data gathering and maintenance operations to be conducted. These data gathering and maintenance operations do not include purging of the containment atmosphere, disposal of EPICOR-II water, or the treatment and disposal of high level radioactively contaminated water in the reactor building

  9. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report

    International Nuclear Information System (INIS)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier; Klennert, Lindsay A.; Nolte, Oliver; Molecke, Martin Alan; Autrusson, Bruno A.; Koch, Wolfgang; Pretzsch, Gunter Guido; Brucher, Wenzel; Steyskal, Michele D.

    2008-01-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO 2 , CeO 2 , plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively supported and

  10. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report.

    Energy Technology Data Exchange (ETDEWEB)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier (Institut de Radioprotection et de Surete Nucleaire, France); Klennert, Lindsay A.; Nolte, Oliver (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Molecke, Martin Alan; Autrusson, Bruno A. (Institut de Radioprotection et de Surete Nucleaire, France); Koch, Wolfgang (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Pretzsch, Gunter Guido (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Brucher, Wenzel (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Steyskal, Michele D.

    2008-03-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO{sub 2}, CeO{sub 2}, plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively

  11. Next Generation Melter Optioneering Study - Interim Report

    International Nuclear Information System (INIS)

    Gray, M.F.; Calmus, R.B.; Ramsey, G.; Lomax, J.; Allen, H.

    2010-01-01

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D 2 0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  12. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  13. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  14. Comprehensive Medical Management of Rosacea: An Interim Study Report and Literature Review

    OpenAIRE

    Del Rosso, James Q.; Baum, Eric W.

    2008-01-01

    Rosacea is a common inflammatory facial dermatosis seen in adults that exhibits considerable variety in clinical presentation. Multiple medical therapeutic options are available including topical and oral treatments. Optimal medical management of rosacea includes assessment of subtype and disease severity and use of appropriate skin care to reduce epidermal barrier dysfunction. This article provides an overall discussion of the medical management of rosacea and reviews interim results from a ...

  15. qPET - a quantitative extension of the Deauville scale to assess response in interim FDG-PET scans in lymphoma

    Energy Technology Data Exchange (ETDEWEB)

    Hasenclever, Dirk [University of Leipzig, Institute for Medical Informatics, Statistics and Epidemiology (IMISE), Leipzig (Germany); Kurch, Lars; Georgi, Thomas; Sabri, Osama; Kluge, Regine [University Hospital Leipzig, Department of Nuclear Medicine, Leipzig (Germany); Mauz-Koerholz, Christine; Koerholz, Dieter [University Hospital Halle, Department of Pediatrics, Halle (Germany); Elsner, Andreas [Hermes Medical Solutions AB, Stockholm (Sweden); Wallace, Hamish [Royal Hospital for Sick Children, Edinburgh, Scotland (United Kingdom); Landman-Parker, Judith [Hopital d' Enfants Armand Trousseau, Paris (France); Moryl-Bujakowska, Angelina [Jagiellonian University Medical College, Department of Pediatric Oncology and Hematology, Polish-American Institute of Pediatrics, Krakow (Poland); Cepelova, Michaela [Department of Pediatric Hematology and Oncology, Faculty Hospital Motol, Prague (Czech Republic); Karlen, Jonas [Karolinska University Hospital, Pediatric Cancer Unit, Astrid Lindgrens Childrens Hospital, Stockholm (Sweden); Alvarez Fernandez-Teijeiro, Ana [University Hospital Virgen Macarena Avda, Department of Pediatric Oncology and Hematology, Sevilla (Spain); Attarbaschi, Andishe [Medical University of Vienna, Department of Pediatric Hematology and Oncology, St. Anna Children' s Hospital, Vienna (Austria); Fossaa, Alexander [Department of Medical Oncology and Radiotherapy, Rikshospitalet - Radiumhospitalet HF, Oslo (Norway); Pears, Jane [Our Lady' s Children' s Hospital, Crumlin, Dublin (Ireland); Hraskova, Andrea [University Children' s Hospital, Clinic of Pediatric Oncology, Bratislava (Slovakia); Bergstraesser, Eva [University Children' s Hospital, Department Oncology, Zurich (Switzerland); Beishuizen, Auke [MC - Sophia Children' s Hospital, Department of Pediatric Oncology/Hematology, Rotterdam (Netherlands); Uyttebroeck, Anne [University Hospitals of Leuven, Department of Pediatric Hemato-Oncology, Leuven (Belgium); Schomerus, Eckhard [University of Odense (OUH), Department of Pediatric Oncology and Hematology, H. C. Andersen Children' s Hospital, Odense (Denmark)

    2014-07-15

    Interim FDG-PET is used for treatment tailoring in lymphoma. Deauville response criteria consist of five ordinal categories based on visual comparison of residual tumor uptake to physiological reference uptakes. However, PET-response is a continuum and visual assessments can be distorted by optical illusions. With a novel semi-automatic quantification tool we eliminate optical illusions and extend the Deauville score to a continuous scale. SUV{sub peak} of residual tumors and average uptake of the liver is measured with standardized volumes of interest. The qPET value is the quotient of these measurements. Deauville scores and qPET-values were determined in 898 pediatric Hodgkin's lymphoma patients after two OEPA chemotherapy cycles. Deauville categories translate to thresholds on the qPET scale: Categories 3, 4, 5 correspond to qPET values of 0.95, 1.3 and 2.0, respectively. The distribution of qPET values is unimodal with a peak representing metabolically normal responses and a tail of clearly abnormal outliers. In our patients, the peak is at qPET = 0.95 coinciding with the border between Deauville 2 and 3. qPET cut values of 1.3 or 2 (determined by fitting mixture models) select abnormal metabolic responses with high sensitivity, respectively, specificity. qPET methodology provides semi-automatic quantification for interim FDG-PET response in lymphoma extending ordinal Deauville scoring to a continuous scale. Deauville categories correspond to certain qPET cut values. Thresholds between normal and abnormal response can be derived from the qPET-distribution without need for follow-up data. In our patients, qPET < 1.3 excludes abnormal response with high sensitivity. (orig.)

  16. qPET - a quantitative extension of the Deauville scale to assess response in interim FDG-PET scans in lymphoma

    International Nuclear Information System (INIS)

    Hasenclever, Dirk; Kurch, Lars; Georgi, Thomas; Sabri, Osama; Kluge, Regine; Mauz-Koerholz, Christine; Koerholz, Dieter; Elsner, Andreas; Wallace, Hamish; Landman-Parker, Judith; Moryl-Bujakowska, Angelina; Cepelova, Michaela; Karlen, Jonas; Alvarez Fernandez-Teijeiro, Ana; Attarbaschi, Andishe; Fossaa, Alexander; Pears, Jane; Hraskova, Andrea; Bergstraesser, Eva; Beishuizen, Auke; Uyttebroeck, Anne; Schomerus, Eckhard

    2014-01-01

    Interim FDG-PET is used for treatment tailoring in lymphoma. Deauville response criteria consist of five ordinal categories based on visual comparison of residual tumor uptake to physiological reference uptakes. However, PET-response is a continuum and visual assessments can be distorted by optical illusions. With a novel semi-automatic quantification tool we eliminate optical illusions and extend the Deauville score to a continuous scale. SUV peak of residual tumors and average uptake of the liver is measured with standardized volumes of interest. The qPET value is the quotient of these measurements. Deauville scores and qPET-values were determined in 898 pediatric Hodgkin's lymphoma patients after two OEPA chemotherapy cycles. Deauville categories translate to thresholds on the qPET scale: Categories 3, 4, 5 correspond to qPET values of 0.95, 1.3 and 2.0, respectively. The distribution of qPET values is unimodal with a peak representing metabolically normal responses and a tail of clearly abnormal outliers. In our patients, the peak is at qPET = 0.95 coinciding with the border between Deauville 2 and 3. qPET cut values of 1.3 or 2 (determined by fitting mixture models) select abnormal metabolic responses with high sensitivity, respectively, specificity. qPET methodology provides semi-automatic quantification for interim FDG-PET response in lymphoma extending ordinal Deauville scoring to a continuous scale. Deauville categories correspond to certain qPET cut values. Thresholds between normal and abnormal response can be derived from the qPET-distribution without need for follow-up data. In our patients, qPET < 1.3 excludes abnormal response with high sensitivity. (orig.)

  17. Comparisons of Cooperative and Non-Cooperative Students: An Analysis of Student Accounting System Data. Interim Report, June, 1981.

    Science.gov (United States)

    Frazier, Don

    The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…

  18. Wayne Interim Storage Site: Annual environmental report for calendar year 1990, Wayne, New Jersey

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Wayne Interim Storage Site (WISS) (a National Priorities List site) and surrounding area began in 1984. WISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Sediment samples were also analyzed for thorium-230, and several nonradiological parameters were measured in groundwater. 16 refs., 12 figs., 23 tabs

  19. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  20. An assessment of seismic margins in nuclear plant piping

    International Nuclear Information System (INIS)

    Chen, W.P.; Jaquay, K.R.; Chokshi, N.C.; Terao, D.

    1995-01-01

    Interim results of an ongoing program to assist the U.S. Nuclear Regulatory Commission (NRC) in developing regulatory positions on the seismic analyses of piping and overall safety margins of piping systems are reported. Results of reviews of previous seismic testing, primarily the Electric Power Research Institute (EPRI)/NRC Piping and Fitting Dynamic Reliability Program, and assessments of the ASME Code, Section III, piping seismic design criteria as revised by the 1994 Addenda are reported. Major issues are identified herein only. Technical details are to be provided elsewhere. (author). 4 refs., 2 figs

  1. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  2. NRC Confirmatory Testing Program for SBWR

    International Nuclear Information System (INIS)

    Han, J.T.; Bessette, D.E.; Shotkin, L.M.

    1994-01-01

    The objective of the NRC Confirmatory Testing Program for SBWR is to provide integral data for code assessment, which reasonably reproduce the important phenomena and processes expected in the SBWR under various loss-of-coolant accident (LOCA) and transient conditions. To achieve this objective, the Program consists of four coupled elements: (1) to design and construct an integral, carefully-scaled SBWR test facility at Purdue Univ., (2) to provide pre-construction RELAP5/CONTAIN predictions of the facility design, (3) to provide confirmatory data for code assessment, and (4) to assess the RELAP5/CONTAIN code with data. A description of the open-quotes preliminary designclose quotes of the Purdue test facility and test matrix is presented. The facility is scheduled to be built by December 1994. Approximately 50 tests will be performed from April 1995 through April 1996 and documented by interim data reports. A final and complete data report is scheduled to be published by July 31, 1996

  3. Groundwater quality assessment plan for the 1324-N/NA Site: Phase 1 (first determination)

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1998-05-01

    The 1324-N Surface Impoundment and 1324-NA Percolation Pond (1324-N/NA Site) are treatment/storage/disposal sites regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). They are located in the 100-N Area of the Hanford Site, and were used to treat and dispose of corrosive waste from a water treatment plant. Groundwater monitoring under an interim-status detection program compared indicator parameters from downgradient wells to background values established from an upgradient well. One of the indicator parameters, total organic carbon (TOC), exceeded its background value in one downgradient well, triggering an upgrade from a detection program to an assessment program. This plan presents the first phase of the assessment program

  4. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    Science.gov (United States)

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  5. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  6. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  7. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    Science.gov (United States)

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  8. Verification and validation interim report for portable 1,000 CFM exhauster skids POR-007/Skid E and POR-008/Skid F

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    This Verification and Validation (V/V) interim report summarizes to date the results of the V/V tasks performed in each of the following life cycle phases: concept, requirements, design, implementation, test, installation and checkout, and operation and maintenance. At the end of the installation and checkout phase, the V/V final report will be issued. This interim report contains or references the following for each phase: Description of V/V tasks performed; Summary of task results; Summary of anomalies and resolution; Assessment of system quality; Recommendations

  9. Fusion tritium program in Japan

    International Nuclear Information System (INIS)

    Okamoto, M.; Yoshida, H.; Naruse, Y.

    1988-01-01

    Nuclear Fusion Council, Atomic Energy Commission of Japan, has started to review the nuclear fusion R and D plan for the next stage, post JT-60. The council launched a subcommittee on fundamental issues in the nuclear fusion development in 1985, for review of the basic strategy of a development plan. The subcommittee presented an interim report in Feb. 1986 after 6 months discussion and the report was approved by the Nuclear Fusion Council. Two major R and D programs described in the interim report are the development of a Tokamak type large facility and the comprehensive development of the fusion reactor technology. The latter means to promote the reactor technologies which will be essential in the future to construct not only a D/T burning but also a DEMO reactor. The Nuclear Fusion Development Program in Japan is shown. The interim report recommended to organize two subcommittees to establish an integrated national R and D plan; one was for the design of the next step large facility and the other was for the R and program of the fusion technology. The subcommittee for the latter consisted of 7 working groups; one of them was organized for the tritium technology

  10. Assessment of Hanford burial grounds and interim TRU storage

    International Nuclear Information System (INIS)

    Geiger, J.F.; Brown, D.J.; Isaacson, R.E.

    1977-08-01

    A review and assessment is made of the Hanford low level solid radioactive waste management sites and facilities. Site factors considered favorable for waste storage and disposal are (1) limited precipitation, (2) a high deficiency of moisture in the underlying sediments (3) great depth to water table, all of which minimize radionuclide migration by water transport, and (4) high sorbtive capacity of the sediments. Facilities are in place for 20 year retrievable storage of transuranic (TRU) wastes and for disposal of nontransuranic radioactive wastes. Auxiliary facilities and services (utilities, roads, fire protection, shops, etc.) are considered adequate. Support staffs such as engineering, radiation monitoring, personnel services, etc., are available and are shared with other operational programs. The site and associated facilities are considered well suited for solid radioactive waste storage operations. However, recommendations are made for study programs to improve containment, waste package storage life, land use economy, retrievability and security of TRU wastes

  11. Developing a program to identify and track corrosion in nuclear plant raw water systems

    International Nuclear Information System (INIS)

    Spires PE, G.V.; Pickles PE, S.B.

    2001-01-01

    Findings derived from a comprehensive plant performance survey at Ontario Power Generation's (OPG) nuclear units convinced management that it would be prudent to expand the ongoing power piping Flow Accelerated Corrosion (FAC) induced wall thinning base-lining and tracking program to encompass the raw cooling water systems as well. Such systems are subject to a distinctly different class of pipe wall thinning (PWT) mechanisms than the FAC that degrades high-energy power piping. This paper describes the PWT corrosion assessment and tracking program that has been developed and is currently being implemented by OPG for the raw cooling water (i.e., Service Water) systems within it's nuclear generating stations. Interim databases are used prior to initial inspection rounds to catalogue the prospective locations. For each piping system being surveyed, these interim databases include physical coordinates for the candidate locations, the type and wall thickness of the components comprising each location, ranking indications and recommended NDE methodologies as a function of the anticipated corrosion mechanisms. Rationales for assessing corrosion susceptibility and ranking prospective inspection sites are expounded by way of notations built into the database. (authors)

  12. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  13. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  14. Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE's Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957

  15. Impacts of the Interim Federal Health Program reforms: A stakeholder analysis of barriers to health care access and provision for refugees.

    Science.gov (United States)

    Antonipillai, Valentina; Baumann, Andrea; Hunter, Andrea; Wahoush, Olive; O'Shea, Timothy

    2017-11-09

    Changes to the Interim Federal Health Program (IFHP) in 2012 reduced health care access for refugees and refugee claimants, generating concerns among key stakeholders. In 2014, a new IFHP temporarily reinstated access to some health services; however, little is known about these changes, and more information is needed to map the IFHP's impact. This study explores barriers occurring during the time period of the IFHP reforms to health care access and provision for refugees. A stakeholder analysis, using 23 semi-structured interviews, was conducted to obtain insight into stakeholder perceptions of the 2014 reforms, as well as stakeholders' position and their influence to assess the acceptability of the IFHP changes. The majority of stakeholders expressed concerns about the 2014 IFHP changes as a result of the continuing barriers posed by the 2012 retrenchments and the emergence of new barriers to health care access and provision for refugees. Key barriers identified included lack of communication and awareness, lack of continuity and comprehensive care, negative political discourse and increased costs. A few stakeholders supported the reforms as they represented some, but limited, access to health care. Overall, the reforms to the IFHP in 2014 generated barriers to health care access and provision that contributed to confusion among stakeholders, the transfer of refugee health responsibility to provincial authorities and the likelihood of increased health outcome disparities, as refugees and refugee claimants chose to delay seeking health care. The study recommends that policy-makers engage with refugee health stakeholders to formulate a policy that improves health care provision and access for refugee populations.

  16. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  17. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  18. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  19. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  20. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  1. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  2. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  3. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  4. Systematic Assessment for University Sexuality Programming.

    Science.gov (United States)

    Westefeld, John S.; Winkelpleck, Judy M.

    1982-01-01

    Suggests systematic empirical assessment is needed to plan university sexuality programing. Proposes the traditional approach of asking about students' attitudes, knowledge, and behavior is useful for developing specific programing content. Presents an assessment model emphasizing assessment of students' desires for sexuality programing in terms…

  5. Industrial Assessment Center Program Impact Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Martin, M.A.

    2000-01-26

    This report presents the results of an evaluation of the U.S. Department of Energy's Industrial Assessment Center (IAC) Program. The purpose of this program is to conduct energy, waste, and productivity assessments for small to medium-sized industrial firms. Assessments are conducted by 30 university-based industrial assessment centers. The purpose of this project was to evaluate energy and cost savings attributable to the assessments, the trained alumni, and the Websites sponsored by this program. How IAC assessments, alumni, and Web-based information may influence industrial energy efficiency decision making was also studied. It is concluded that appreciable energy and cost savings may be attributed to the IAC Program and that the IAC Program has resulted in more active and improved energy-efficiency decision making by industrial firms.

  6. Colonie Interim Storage Site: Annual environmental report for calendar year 1990, Colonie, New York

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Colonie Interim Storage Site (CISS) and surrounding area began in 1984. CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sties where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The routine environmental monitoring program at CISS includes sampling networks for external gamma radiation exposures and for radium-226, throium-232, an total uranium concentrations in surface water, sediment, and groundwater. Additionally, the nonradiological parameters volatile and semivolatile organics, pesticides/polychlorinated biphenyls (PCBs), metals, total organic carbon (TOC), total organic halides (TOX), specific conductivity, and pH are measured in groundwater. 14 refs., 20 figs., 25 tabs

  7. First interim examination of defected BWR and PWR rods tested in unlimited air at 2290C

    International Nuclear Information System (INIS)

    Einziger, R.E.; Cook, J.A.

    1983-01-01

    A five-year whole rod test was initiated to investigate the long-term stability of spent fuel rods under a variety of possible dry storage conditions. Both PWR and BWR rods were included in the test. The first interim examination was conducted after three months of testing to determine if there was any degradation in those defected rods stored in an unlimited air atmosphere. Visual observations, diametral measurements and radiographic smears were used to assess the degree of cladding deformation and particulate dispersal. The PWR rod showed no measurable change from the pre-test condition. The two original artificial defects had not changed in appearance and there was no diametral growth of the cladding. One of the defects in BWR rod showed significant deformation. There was approximately 10% cladding strain at the defect site and a small axial crack had formed. The fuel in the defect did not appear to be friable. The second defect showed no visible change and no cladding strain. Following examination, the test was continued at 230 0 C. Another interim examination is planned during the summer of 1983. This paper discusses the details and meaning of the data from the first interim examination

  8. 200-ZP-1 phase 2 interim remedial measure quarterly report, August--October 1996

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.; Jacques, I.D.; McMahon, W.J.; Singleton, K.M.; Strope, S.A.; Swanson, L.C.; Windmueller, C.R.

    1996-11-01

    A groundwater pump-and-treat system is being operated in the 200-ZP-1 Operable Unit under authority of the Hanford Federal Facility Agreement and Consent Order . The purpose of the pump-and-treat system is to accomplish the following: Minimize further migration of the high-concentration portion of the carbon tetrachloride plume and co-contaminants chloroform and trichlorethylene in the 200-ZP-1 Operable Unit Provide data for evaluation of final remedy selection. The 200-ZP-1 pump-and-treat operations were conducted as a pilot-scale treatability test and interim remedial measure treatment system between August 1994 and July 1996 to assess the effectiveness of liquid-phase granular activated carbon carbon tetrachloride removal. The pilot-scale treatability test's removal efficiently was determined to be 99.96% for carbon tetrachloride, chloroform, and trichloroethylene. This report summarizes and evaluates treatment, hydraulic, and hydrochemistry data collected for the 200-ZP-1 interim remedial measure from August through September 1996

  9. Overview of the US spent nuclear fuel program

    International Nuclear Information System (INIS)

    Hurt, W.L.

    1999-01-01

    This report, Overview of the United States Spent Nuclear Fuel Program, December, 1997, summarizes the U.S. strategy for interim management and ultimate disposition of spent nuclear fuel from research and test reactors. The key elements of this strategy include consolidation of this spent nuclear fuel at three sites, preparation of the fuel for geologic disposal in road-ready packages, and low-cost dry interim storage until the planned geologic repository is opened. The U.S. has a number of research programs in place that are intended to Provide data and technologies to support both characterization and disposition of the fuel. (author)

  10. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  11. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

  12. Development of a unit cell model for interim performance assessment of vitrified low level waste disposal

    International Nuclear Information System (INIS)

    Kline, N.W.

    1995-09-01

    The unit cell modeling approach has been developed and used in analysis of some design options for a vitrified low level waste disposal facility. The unit cell modeling approach is likely to be useful in interim performance assessment for the facility. The present unit cell model will probably need to be refitted in terms of some model parameters for the latter purpose. Two present disposal facility concepts differ in the length of a capillary barrier proposed to limit effective recharge through the top of the facility. Results of the study summarized herein suggest design of a capillary barrier which can reduce a recharge rate of 0.1 cm/yr by one or two orders of magnitude seems feasible for both concepts. A benchmark comparison of the unit cell model against a full facility model shows comparable predictive accuracy in less than one percent of the computer time. Results suggest that model parameters include capillary barrier performance, inter-canister spacing, rate of moisture withdrawal due to glass corrosion, contaminant inventory, and the well interceptor factor. It is also important that variations of waste form hydraulic parameters suggest that transport through the waste form is dominated by diffusion

  13. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  14. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  15. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  16. 75 FR 18095 - America's Marine Highway Program

    Science.gov (United States)

    2010-04-09

    ... Marine Highway Transportation. Authority: Energy Independence and Security Act of 2007, Sections 1121...] RIN 2133-AB70 America's Marine Highway Program AGENCY: Maritime Administration, Department of... interim final rule that established America's Marine Highway Program, under which the Secretary will...

  17. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  18. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  19. Effectiveness of interim stage filter in the exhaust system of glove boxes

    International Nuclear Information System (INIS)

    Patre, D.K.; Vangara, H.; Thanamani, S.; Gopalakrishnan, R.K.; Mhatre, Amol M.

    2018-01-01

    All operations in radiochemical laboratories are carried out in containment systems like Glove boxes and Fume hoods. For controlling air contamination two separate air cleaning systems are incorporated. Laboratory has general ventilation system and glove boxes are provided with a negative pressure system (NPS). Glove box exhaust air is passed through three stage filtration systems: in situ, interim and final before discharging to the atmosphere. In addition to the individual HEPA filters of each glove box, there is an interim HEPA filter bank introduced at the laboratory end. This was introduced to reduce a load on main exhaust filter system. Finally the exhaust air is discharged through the final stage HEPA filter located in the filter house through the Stack. The interim HEPA filter bank provides additional protection for the release of particulate activity and reduces load on the final stage filters. In the present work efforts have been put to validate the interim stage filter, which has been introduced, to limit the environmental release

  20. Development of a Computer Program for the Analysis Logistics of PWR Spent Fuels

    International Nuclear Information System (INIS)

    Choi, Heui Joo; Choi, Jong Won; Cha, Jeong Hun

    2008-01-01

    It is expected that the temporary storage facilities at the nuclear power plants will be full of the spent fuels within 10 years. Provided that a centralized interim storage facility is constructed along the coast of the Korean peninsula to solve this problem, a substantial amount of spent fuels should be transported by sea or by land every year. In this paper we developed a computer program for the analysis of transportation logistics of the spent fuels from 4 different nuclear power plant sites to the hypothetical centralized interim storage facility and the final repository. Mass balance equations were used to analyze the logistics between the nuclear power plants and the interim storage facility. To this end a computer program, CASK, was developed by using the VISUAL BASIC language. The annual transportation rates of spent fuels from the four nuclear power plant sites were determined by using the CASK program. The parameter study with the program illustrated the easiness of logistics analysis. The program could be used for the cost analysis of the spent fuel transportation as well.

  1. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  2. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  3. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  4. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Science.gov (United States)

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  5. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  6. Uranium exploration of the Colorado Plateau: interim staff report

    International Nuclear Information System (INIS)

    1980-10-01

    This report is an issue of the original draft copy of the Interim Staff Report on Uranium Exploration on the Colorado Plateau, dated June 1951. The original draft copy was only recently located and is being published at this time because of the interest in the contained historical content. The table of contents of this report lists: history of uranium mining; geology; proposed program for the geologic investigations section; general activities of industry and government; and future exploration of sedimentary uranium deposits and anticipated results. Under the proposed program section are: future of the copper-uranium deposits as a source of uranium; uraniferous asphaltite deposits; and commission exploration and future possibilities. The section on general activities of industry and government includes: exploratory and development drilling; field investigations and mapping; early geologic investigations and investigations by the US geological survey; and geophysical exploration. Tables are also presented on: uranium production by districts; US Geological survey drilling statistics; Colorado Exploration Branch drilling statistics; summary of drilling projects; and comparative yearly core-drill statistics on the Colorado Plateau

  7. Assessment Practices in Undergraduate Accounting Programs

    Science.gov (United States)

    Lusher, Anna L.

    2010-01-01

    This study examined accounting program assessment plans at 102 colleges and universities in the United States. The research focused on identifying assessment practices in undergraduate accounting programs by examining the skills and competencies assessed and determining the methods of assessment used. The study also investigated what course and/or…

  8. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Science.gov (United States)

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  9. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Science.gov (United States)

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  10. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  11. Senior Program Officer, Evaluation | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... provides technical assistance to program staff and partners on evaluation ... monitoring and evaluation approaches; working with colleagues to maintain the ... provides technical supervision and assistance, including analysis of interim ...

  12. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  13. Concepts for the interim storage of spent fuel elements from research reactors in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Niephaus, D.; Bensch, D.; Quaassdorff, P.; Plaetzer, S.

    1997-01-01

    Research reactors have been operated in the Federal Republic of Germany since the late fifties. These are Material Test Reactors (MTR) and training, Research and Isotope Facilities of General Atomic (TRIGA). A total of seven research reactors, i.e. three TRIGA and four MTR facilities were still in operation at the beginning of 1996. Provisions to apply to the back-end of the fuel cycle are required for their continued operation and for already decommissioned plants. This was ensured until the end of the eighties by the reprocessing of spent fuel elements abroad. In view of impeding uncertainties in connection with waste management through reprocessing abroad, the development of a national back-end fuel cycle concept was commissioned by the Federal Minister of Education, Science, Research and Technology in early 1990. Development work was oriented along the lines of the disposal concept for irradiated light-water reactor fuel elements from nuclear power plants. Analogously, the fuel elements from research reactors are to be interim-stored on a long-term basis in adequately designed transport and storage casks and then be directly finally disposed without reprocessing after up to forty years of interim storage. As a first step in the development of a concept for interim storage, several sites with nuclear infrastructure were examined and assessed with respect to their suitability for interim storage. A reasonably feasible reference concept for storing the research reactor fuel elements in CASTOR MTR 2 transport and storage casks at the Ahaus interim storage facility (BZA) was evaluated and the hot cell facility and AVR store of Forschungszentrum Juelich (KFA) were proposed as an optional contingency concept for casks that cannot be repaired at Ahaus. Development work was continued with detailed studies on these two conceptual variants and the results are presented in this paper. (author)

  14. Environmental surveillance results for 1995 for the Hazelwood Interim Storage Site

    International Nuclear Information System (INIS)

    McCague, J.C.

    1996-01-01

    This memorandum presents and interprets analytical results and measurements obtained as part of the 1995 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The discussion provides a comparative analysis of average historical background conditions and applicable regulatory criteria to the 1995 results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1995 environmental surveillance program at HISS indicate that, with the exception of thorium-230 in streambed sediment, applicable US Department of Energy (DOE) guidelines were not exceeded for any measured parameter or for any dose calculated for potentially exposed members of the general public. In the absence of sediment guidelines, DOE soil guidelines serve as a standard of comparison for data obtained from stream bed sediment; two samples from downstream locations contained concentrations of thorium-230 that exceeded DOE soil guidelines. All stormwater sample results were in compliance with permit-specified limits. Other radioactive materials include radium 226 and natural uranium

  15. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  16. Interim data quality objectives for waste pretreatment and vitrification. Revision 1

    International Nuclear Information System (INIS)

    Kupfer, M.J.; Conner, J.M.; Kirkbride, R.A.; Mobley, J.R.

    1994-01-01

    The Tank Waste Remediation System (TWRS) is responsible for storing, processing, and immobilizing the Hanford Site tank wastes. Characterization information on the tank wastes is needed so that safety concerns can be addressed, and retrieval, pretreatment, and immobilization processes can be designed, permitted, and implemented. This document describes the near-term tank waste sampling and characterization needs of the Pretreatment, High-Level Waste (HLW) Disposal, and Low-Level Waste (LLW) Disposal Programs to support the TWRS disposal mission. The final DQO (Data Quality Objective) will define specific waste tanks to be sampled, sample timing requirements, an appropriate analytical scheme, and a list of required analytes. This interim DQO, however, focuses primarily on the required analytes since the tanks to be sampled in FY 1994 and early FY 1995 are being driven most heavily by other considerations, particularly safety. The major objective of this Interim DQO is to provide guidance for tank waste characterization requirements for samples taken before completion of the final DQO. The characterization data needs defined herein will support the final DQO to help perform the following: Support the TWRS technical strategy by identification of the chemical and physical composition of the waste in the tanks and Guide development efforts to define waste pretreatment processes, which will in turn define HLW and LLW feed to vitrification processes

  17. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  18. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  19. Interim relative potency factors for the toxicological risk assessment of pyrrolizidine alkaloids in food and herbal medicines.

    Science.gov (United States)

    Merz, Karl-Heinz; Schrenk, Dieter

    2016-11-30

    Pyrrolizidine alkaloids (PAs) are among the most potent natural toxins occurring in a broad spectrum of plant species from various families. Recently, findings of considerable contamination of teas/herbal infusions prepared from non-PA plants have been reported. These are obviously due to cross-contamination with minor amounts of PA plants and can affect both food and herbal medicines. Another source of human exposure is honey collected from PA plants. These findings illustrate the requirement for a comprehensive risk assessment of PAs, hampered by the enormous number of different PA congeners occurring in nature. Up to now, risk assessment is based on the carcinogenicity of certain PAs after chronic application to rats using the sum of detected PAs as dose metric. Because of the well-documented large structure-dependent differences between sub-groups of PA congeners with respect to their genotoxicity and (cyto)toxicity, however, this procedure is inadequate. Here we provide an overview of recent attempts to assess the risk of PA exposure and the available literature on the toxic effects and potencies of different congeners. Based on these considerations, we have derived interim Relative Potency (REP) factors for a number of abundant PAs suggesting a factor of 1.0 for cyclic di-esters and open-chain di-esters with 7S configuration, of 0.3 for mono-esters with 7S configuration, of 0.1 for open-chain di-esters with 7R configuration and of 0.01 for mono-esters with 7R configuration. For N-oxides we suggest to apply the REP factor of the corresponding PA. We are confident that the use of these values can provide a more scientific basis for PA risk assessment until a more detailed experimental analysis of the potencies of all relevant congeners can be carried out. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  1. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey

    International Nuclear Information System (INIS)

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment

  2. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  3. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    International Nuclear Information System (INIS)

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment

  4. Psychological Assessment Training in Clinical Psychology Doctoral Programs.

    Science.gov (United States)

    Mihura, Joni L; Roy, Manali; Graceffo, Robert A

    2017-01-01

    We surveyed American Psychological Association-accredited clinical psychology doctoral programs' (n = 83) training in psychological assessment-specifically, their coverage of various assessment topics and tests in courses and practica, and whether the training was optional or required. We report results overall and separately per training model (clinical science, scientist-practitioner, and practitioner-focused). Overall, our results suggest that psychological assessment training is as active, or even more active, than in previous years. Areas of increased emphasis include clinical interviewing and psychometrics; multimethod, outcomes, health, and collaborative or therapeutic assessment; and different types of cognitive and self-report personality tests. All or almost all practice-focused programs offered training with the Thematic Apperception Test and Rorschach compared to about half of the scientist-practitioner programs and a third of the clinical science programs. Although almost all programs reported teaching multimethod assessment, what constitutes different methods of assessing psychopathology should be clarified in future studies because many programs appear to rely on one method-self-report (especially clinical science programs). Although doctoral programs covered many assessment topics and tests in didactic courses, there appears to be a shortage of program-run opportunities for students to obtain applied assessment training. Finally, we encourage doctoral programs to be familiar with (a) internships' assessment expectations and opportunities, (b) the professional guidelines for assessment training, and (c) the American Psychological Association's requirements for preinternship assessment competencies.

  5. Hazelwood Interim Storage Site annual site environmental report: Calendar year 1986

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Hazelwood Interim Storage Site (HISS), a US Department of Energy (DOE) facility located in the City of Hazelwood, Missouri. Originally known as the Cotter Corporation site on Latty Avenue in Hazelwood, the HISS is presently used for the storage of soils contaminated with residual radioactive material. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring program are being conducted at the site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the HISS measures radon gas concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 2% of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles. The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 11 refs., 6 figs., 10 tabs

  6. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  7. Sample Results From The Interim Salt Disposition Program Macrobatch 7 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B.; Washington, A. L. II

    2013-08-08

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 7 for the Interim Salt Disposition Program (ISDP). An ARP and several ESS tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP/MCU. No issues with the projected Salt Batch 7 strategy are identified, other than the presence of visible quantities of dark colored solids. A demonstration of the monosodium titanate (0.2 g/L) removal of strontium and actinides provided acceptable 4 hour average decontamination factors for Pu and Sr of 3.22 and 18.4, respectively. The Four ESS tests also showed acceptable behavior with distribution ratios (D(Cs)) values of 15.96, 57.1, 58.6, and 65.6 for the MCU, cold blend, hot blend, and Next Generation Solvent (NGS), respectively. The predicted value for the MCU solvent was 13.2. Currently, there are no models that would allow a prediction of extraction behavior for the other three solvents. SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed. While no outstanding issues were noted, the presence of solids in the samples should be investigated in future work. It is possible that the solids may represent a potential reservoir of material (such as potassium) that could have an impact on MCU performance if they were to dissolve back into the feed solution. This salt batch is intended to be the first batch to be processed through MCU entirely using the new NGS-MCU solvent.

  8. Methodology of safety assessment for radioactive waste disposal

    International Nuclear Information System (INIS)

    Matsuzuru, Hideo; Kimura, Hideo

    1991-01-01

    The Japan Atomic Energy Research Institute (JAERI) is conducting an extensive R and D program to develop a safety assessment methodology to evaluate environmental consequences associated with geological disposal of a high-level radioactive waste, and also to elucidate a generic feasibility of the geological disposal in Japan. The paper describes the current R and D activities in the JAERI to develop an interim version of the methodology based on a normal evolution scenario, and also to validate models used in the methodology. (author)

  9. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  10. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  11. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  12. ARBRE monitoring - ecology of short rotation coppice plantations. Interim report 2000

    Energy Technology Data Exchange (ETDEWEB)

    Rich, T.J.; Sage, R.; Moore, N.; Robertson, P.; Aegerter, J.; Bishop, J.

    2001-07-01

    Short Rotation willow coppice (SRC) is a potential habitat for wildlife in the British countryside according to research reported in the late 1990s, but so far the trials have been on small plantations without reference to the land use it would supersede. This interim report, on a 4-year study which began in January 2000, discusses the commercial availability of SRC plantations and assesses what might be achievable by changing land usage. Work so far, conducted on indicator species (songbirds, ground flora, butterflies, insects), suggests that there are likely to be marked environmental benefits to be gained through SRC.

  13. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  14. 77 FR 27593 - Exchange Visitor Program-Summer Work Travel

    Science.gov (United States)

    2012-05-11

    ...--Summer Work Travel AGENCY: Department of State. ACTION: Interim final rule with request for comment... Travel Program allows foreign post-secondary students (mostly between the ages of 18 and 30) to come to... students have participated in the Sumer Work Travel Program. The popularity of this Program--both with...

  15. 3013/9975 Surveillance Program Interim Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-06-22

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program [Reference 1] outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) [Reference 2] for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container [Reference 3]. The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure & Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure & Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  16. Hazelwood interim storage site: Annual site environmental report, Hazelwood, Missouri, Calendar Year 1988

    International Nuclear Information System (INIS)

    1989-04-01

    The monitoring program at Hazelwood Interim Storage Site (HISS) measures radon concentrations in air; external gamma radiation levels; and uranium, radium, and thorium, concentrations in surface water, groundwater and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect or public health, the radiation dose was calculated for a hypothetical maximally exposed individual. Based on the scenario described in this report, this hypothetical individual at HISS would receive an annual external exposure approximately equivalent to 1 percent of the DOE radiation protection standard. This exposure is less than the exposure a person receives during a flight from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of HISS that results from radioactive materials present at the site is indistinguishable from the dose that the same population receives from naturally occurring radioactive sources. The results of 1988 monitoring show that HISS is in compliance with the DOE radiation protection standard. 15 refs., 16 figs., 13 tabs

  17. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  18. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  19. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  20. 78 FR 28953 - William D. Ford Federal Direct Loan Program

    Science.gov (United States)

    2013-05-16

    .... Ford Federal Direct Loan Program; Interim Final Rule #0;#0;Federal Register / Vol. 78, No. 95... [Docket ID ED-2013-OPE-0066] RIN 1840-AD13 William D. Ford Federal Direct Loan Program AGENCY: Office of... Secretary amends the William D. Ford Federal Direct Loan Program (Direct Loan Program) regulations to...

  1. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  2. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  3. The C.L.E.A.N. program: Regulating legacy sites

    International Nuclear Information System (INIS)

    Stenson, R.E.; Clement, C.H.

    2002-01-01

    With the coming into force of the Canadian Nuclear Safety and Control Act (NSCA) on May 31, 2000 many sites, that were not subject to licensing under the previous Atomic Energy Control Act (AECA), now required regulatory review and possibly a licence to possess nuclear substances. To ensure consistency in approach, completeness in coverage, and compliance with internal procedures, the Contaminated Lands Evaluation and Assessment Network (CLEAN) program was developed. Over 200 contaminated lands sites required evaluation. Some of the issues and the interim recommendations to the Commission are discussed. (author)

  4. 3013/9975 Surveillance Program Interim Summary Report

    International Nuclear Information System (INIS)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-01-01

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program (Reference 1) outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) (Reference 2) for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container (Reference 3). The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure and Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure and Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  5. The Safety Assessment of Long term Interim Storage at Sellafield

    International Nuclear Information System (INIS)

    Buchan, Andrew B.

    2014-01-01

    The Sellafield site comprises a wide range of nuclear facilities, including operating facilities associated with the Magnox reprocessing programme, the Thermal Oxide Reprocessing Plant (THORP) and a range of waste treatment plants. The operational life of some of the site facilities currently extends to 2120, requiring the retrieval, treatment, consolidation and safe extended storage of a variety of radioactive materials. Sellafield has utilised its existing safety assessment processes to inform and prioritise studies into beyond design basis events and resilience evaluation required following Fukushima by UK regulators and industry bodies such as WANO. There are significant differences between NPPs, for which the ENSREG 'stress tests' were originally intended, and the Sellafield site which is instead centered around two reprocessing facilities (Magnox and THORP), with a supporting infrastructure of waste processing and storage facilities, coupled with a legacy of high hazard older facilities. In the former case the consequences of a catastrophic failure are promptly realised, leading to significant problems such as fuel failure / meltdown in AGRs and LWRs respectively in the event of complete loss of cooling. At Sellafield, the processes are carried out at comparatively low temperatures and pressures with relatively low rates of change following any loss of cooling. Instead the consequences of catastrophic failure at Sellafield are more directly related to the very large inventories of radioactive materials, including high level liquid wastes and unprocessed fuels, present in specific plants and to the condition of the ageing assets, holding legacy wastes. The paper will consider how a number of analysis techniques have been used to establish a safety case for fault and accident conditions, i.e. design basis analysis (DBA), probabilistic safety analysis (PSA) and severe accident analysis (SAA) DBA is focused on the key safety measures for those initiating faults

  6. Colonie Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP)

  7. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    International Nuclear Information System (INIS)

    Bryan, Charles R.; Enos, David G.

    2015-01-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  8. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Charles R. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Enos, David G. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  9. Yucca Mountain socioeconomic project: An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    The State of Nevada formally initiated a study of the socioeconomic impacts of a proposed high-level nuclear waste repository at Yucca Mountain in southern Nevada in 1986 after the Nevada site had been chosen as a potential waste disposal site. The State and affected local governments that participated in the development of the study recognized that the effort would need to go well beyond what is traditionally considered adequate for socioeconomic impact assessment because of the unique nature of the repository project. This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  10. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  11. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  12. State Program Integrity Assessment (SPIA)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The State Program Integrity Assessment (SPIA) is the Centers for Medicare and Medicaid Services (CMS) first national data collection on state Medicaid program...

  13. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  14. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  15. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  16. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  17. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    1975-08-01

    The report describes the wide-ranging program of engineering developments and applications to provide the Canadian nuclear industry with the knowledge and expertise it needs to conduct its waste management program. The need for interim dry storage of spent fuel, and the storage and ultimate disposal of waste from fuel reprocessing are examined. The role of geologic storage in AECL's current waste management program is also considered. (R.A.)

  18. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  19. CHOOZ-A expert assessment program

    International Nuclear Information System (INIS)

    Bouat, M.; Godin, R.

    1993-01-01

    CHOOZ-A Nuclear Power Plant, the first French-Belgian PWR unit (300 MWe) was definitively shut down at the end of October 1991, after 24 years in operation. Since summer 1991, the steering committee of the French (EDF) Lifetime Project has initiated a large inquiry to the different technical specialists of EDF and external organizations, trying to define a wide expert assessment program on this plant. The aim is to improve the knowledge of aging mechanisms such as those observed on the 52 PWR French nuclear power plants (900 and 1,300 MWe), and contribute to the validation of non-destructive in-service testing methods. This paper presents the retained CHOOZ-A expert assessment program and technical lines followed during its set up. First major project stages are described, then technical choices are explained, and at last the final program is presented with the specific content of each expert assessment. The definitive program is scheduled for a three year period starting at the moment of final shutdown license acquisition, with a provisional total budget of more than US $10 million

  20. Corrosion behaviour of metallic containers during long term interim storages

    International Nuclear Information System (INIS)

    Desgranges, C.; Feron, D.; Mazaudier, F.; Terlain, A.

    2001-01-01

    Two main corrosion phenomena are encountered in long term interim storage conditions: dry oxidation by the air when the temperature of high level nuclear wastes containers is high enough (roughly higher than 100 C) and corrosion phenomena as those encountered in outdoor atmospheric corrosion when the temperature of the container wall is low enough and so condensation is possible on the container walls. Results obtained with dry oxidation in air lead to predict small damages (less than 1μm on steels over 100 years at 100 C) and no drastic changes with pollutants. For atmospheric corrosion, first developments deal with a pragmatic method that gives assessments of the indoor atmospheric corrosivities. (author)

  1. Software Verification and Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    International Nuclear Information System (INIS)

    YEH, T.

    2002-01-01

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent

  2. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    International Nuclear Information System (INIS)

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  3. Relative risk measure suitable for comparison of design alternatives of interim spent nuclear fuel storage facility

    International Nuclear Information System (INIS)

    Ferjencik, M.

    1997-01-01

    Accessible reports on risk assessment of interim spent nuclear fuel storage facilities presume that only releases of radioactive substances represent undesired consequences. However, only certain part of the undesired consequences is represented by them. Many other events are connected with safety and are able to cause losses to the operating company. The following two presumptions are pronounced based on this. 1. Any event causing a disturbance of a safety function of the storage facility is an incident event. 2. Any disturbance of a safety function is an undesired consequence. If the facility safety functions are identified and if the severity of their disturbances is quantified, then it is possible to combine consequence severity quantifications and event frequencies into a risk measure. Construction and application of such a risk measure is described in this paper. The measure is shown to be a tool suitable for comparison of interim storage technology design alternatives. (author)

  4. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  5. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  6. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  7. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  8. A web-based endpoint adjudication system for interim analyses in clinical trials.

    Science.gov (United States)

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However

  9. Glass packages in interim storage; Les verres dans les stockages

    Energy Technology Data Exchange (ETDEWEB)

    Jacquet-Francillon, N

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  10. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    BACKGROUND: A recent meta-analysis raised concern regarding an increased risk of myocardial infarction and death from cardiovascular causes associated with rosiglitazone treatment of type 2 diabetes. METHODS: We conducted an unplanned interim analysis of a randomized, multicenter, open...... group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...... in the control group had the adjudicated primary end point (hazard ratio, 1.08; 95% confidence interval [CI], 0.89 to 1.31). After the inclusion of end points pending adjudication, the hazard ratio was 1.11 (95% CI, 0.93 to 1.32). There were no statistically significant differences between the rosiglitazone...

  11. Symptomatic treatment in multiple sclerosis-interim analysis of a nationwide registry.

    Science.gov (United States)

    Skierlo, S; Rommer, P S; Zettl, U K

    2017-04-01

    To analyze symptomatic treatment in patients with multiple sclerosis (MS). Multiple sclerosis is a chronic inflammatory disease of the central nervous system, with accumulating disability symptoms like spasticity, voiding disorders, depression, and pain might occur. The nationwide German MS registry was initiated 2001 under guidance of the German MS society (Deutsche MS Gesellschaft). This study was performed as an interim analysis to lay foundation for future work on this topic. A subcohort of 5113 patients was assessed for this interim analysis. The mean age of the patients was 45.3 years; mean EDSS was 4.2. More than two-third of the enrolled patients were females (70.9%). Most frequent symptoms were fatigue (60%), followed by spasticity (52.5%) and voiding disorders (51.7%). The likelihood of treatment was highest for epileptic disorders (68.8%), spasticity (68.5%), pain (60.7%), and depression (58.9%). Multivariate regression analysis showed that retirement was the strongest factor predictive for antispastic treatment (β=.061, P=.005). Almost all patients in this analysis suffer from symptoms due to advanced MS. Treatment for the various symptoms differed tremendously. The likelihood of treatment correlated with the availability of effective therapeutic agents. Clinicians should put more awareness on MS symptoms. Symptomatic treatment may improve quality of life. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  12. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Science.gov (United States)

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  13. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  14. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  15. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  16. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  17. Waste isolation safety assessment program

    International Nuclear Information System (INIS)

    Brandstetter, A.; Harwell, M.A.

    1979-05-01

    Associated with commercial nuclear power production in the United States is the generation of potentially hazardous radioactive wastes. The Department of Energy (DOE), through the National Waste Terminal Storage (NWTS) Program, is seeking to develop nuclear waste isolation systems in geologic formations that will preclude contact with the biosphere of waste radionuclides in concentrations which are sufficient to cause deleterious impact on humans or their environments. Comprehensive analyses of specific isolation systems are needed to assess the expectations of meeting that objective. The Waste Isolation Safety Assessment Program (WISAP) has been established at the Pacific Northwest Laboratory (operated by Battelle Memorial Institute) for developing the capability of making those analyses. Among the analyses required for isolation system evaluation is the detailed assessment of the post-closure performance of nuclear waste repositories in geologic formations. This assessment is essential, since it is concerned with aspects of the nuclear power program which previously have not been addressed. Specifically, the nature of the isolation systems (e.g., involving breach scenarios and transport through the geosphere), and the time-scales necessary for isolation, dictate the development, demonstration and application of novel assessment capabilities. The assessment methodology needs to be thorough, flexible, objective, and scientifically defensible. Further, the data utilized must be accurate, documented, reproducible, and based on sound scientific principles

  18. Federal Administrative Court confirms interim action for the Kruemmel power plant site

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The interim action concerning the reactor site was confirmed in 1972, the action of voidance because of the possible injuriousness to health was rejected in the first instance. In the appeal OVG Lueneburg had sharpened three clauses concerning the contents of the restrictions and injunctions included in the interim action to the disadvantage of the operator. Responding to a new appeal the BVerwG has eliminated these restrictions and dismissed the following appeals of the plaintiffs. (HP) [de

  19. [The history of the Kaiser Wilhelm Society during the Third Reich. Interim reports of the president's commission of the Max Planck Society].

    Science.gov (United States)

    Weber, M M

    2002-11-01

    In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.

  20. 77 FR 34935 - Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind...

    Science.gov (United States)

    2012-06-12

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket T-4-2012] Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind Turbine Nacelles and Hubs); Notice of... temporary/interim manufacturing (T/IM) authority, on behalf of Siemens Energy, Inc., to manufacture wind...

  1. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    Science.gov (United States)

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from climate.copernicus.eu" target="_blank">ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  2. Translating Theory Into Practice: Implementing a Program of Assessment.

    Science.gov (United States)

    Hauer, Karen E; O'Sullivan, Patricia S; Fitzhenry, Kristen; Boscardin, Christy

    2018-03-01

    A program of assessment addresses challenges in learner assessment using a centrally planned, coordinated approach that emphasizes assessment for learning. This report describes the steps taken to implement a program of assessment framework within a medical school. A literature review on best practices in assessment highlighted six principles that guided implementation of the program of assessment in 2016-2017: (1) a centrally coordinated plan for assessment aligns with and supports a curricular vision; (2) multiple assessment tools used longitudinally generate multiple data points; (3) learners require ready access to information-rich feedback to promote reflection and informed self-assessment; (4) mentoring is essential to facilitate effective data use for reflection and learning planning; (5) the program of assessment fosters self-regulated learning behaviors; and (6) expert groups make summative decisions about grades and readiness for advancement. Implementation incorporated stakeholder engagement, use of multiple assessment tools, design of a coaching program, and creation of a learner performance dashboard. The assessment team monitors adherence to principles defining the program of assessment and gathers and responds to regular feedback from key stakeholders, including faculty, staff, and students. Next steps include systematically collecting evidence for validity of individual assessments and the program overall. Iterative review of student performance data informs curricular improvements. The program of assessment also highlights technology needs that will be addressed with information technology experts. The outcome ultimately will entail showing evidence of validity that the program produces physicians who engage in lifelong learning and provide high-quality patient care.

  3. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    Science.gov (United States)

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  4. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  5. Dry interim storage of radioactive material in Germany

    International Nuclear Information System (INIS)

    Drobniewski, Christian; Palmes, Julia

    2013-01-01

    In accordance with the waste management concept in Germany, spent fuel is stored in interim storage facilities for a period of up to 40 years until deposition in a geological repository. In twelve on-site interim storages in the vicinity or directly on the sites of the nuclear power plants, spent fuel elements from reactor operation are stored after the necessary period of decay in wet storage basins inside the reactors. Additionally, three central interim storage facilities for storage of spent fuel of different origin are in operation. The German facilities realize the concept of dry interim storage in metallic transport and storage casks. The confinement of the radioactive material is ensured by the double lid system of the casks, of which the leak tightness is monitored constantly. The casks are constructed to provide adequate heat removal and shielding of gamma and neutron radiation. Usually the storage facilities are halls of thick concrete structures, which ensure the removal of the decay heat by natural convection. The main safety goal of the storage concept is to prevent unnecessary exposure of persons, material goods and environment to ionizing radiation. Moreover any exposure should be kept as low as reasonable achievable. To reach this goal the containment of the radioactive materials, the disposal of decay heat, the sub criticality and the shielding of ionizing radiation has to be demonstrated by the applicant and verified by the licensing authority. In particular accidents, incidents and disasters have to be considered in the facility and cask design. This includes mechanical impacts onto the cask, internal and external fire, and environmental effects like wind, rain, snowfall, flood, earthquakes and landslides. In addition civilizatoric influences like plane crashes and explosions have to be taken into account. In all mentioned cases the secure confinement of the radioactive materials has to be ensured. On-site storage facilities have to consider the

  6. The radiation safety self-assessment program of Ontario Hydro

    International Nuclear Information System (INIS)

    Armitage, G.; Chase, W.J.

    1987-01-01

    Ontario Hydro has developed a self-assessment program to ensure that high quality in its radiation safety program is maintained. The self-assessment program has three major components: routine ongoing assessment, accident/incident investigation, and detailed assessments of particular radiation safety subsystems or of the total radiation safety program. The operation of each of these components is described

  7. State child health; revisions to the regulations implementing the State Children's Health Insurance Program. Interim final rule with comment period; revisions, delay of effective date, and technical amendments to final rule.

    Science.gov (United States)

    2001-06-25

    Title XXI authorizes the State Children's Health Insurance Program (SCHIP) to assist State efforts to initiate and expand the provision of child health assistance to uninsured, low-income children. On January 11, 2001 we published a final rule in the Federal Register to implement SCHIP that has not gone into effect. This interim final rule further delays the effective date, revises certain provisions and solicits public comment, and makes technical corrections and clarifications to the January 2001 final rule based on further review of the comments received and applicable law. Only the provisions set forth in this document have changed. All other provisions set forth in the January 2001 final rule will be implemented without change.

  8. Guidelines for interim storage of low level waste

    International Nuclear Information System (INIS)

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  9. Pacific Northwest regional assessment program

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Pacific Northwest (comprised of the states of Alaska, Idaho, Montana, Oregon, Washington and Wyoming) can by several measures be regarded as a national warehouse of fossil energy resources. This condition coupled with an evolving national policy stressing utilization of fossil fuels in the near term prior to development of more advanced technologies for energy supply, could result in the imposition of major changes in the region's environmental, socioeconomic and possibly health status. The objective of the Pacific Northwest Regional Assessment Program is to establish and exercise an integrated analytical assessment program for evaluation of these potential changes that may result from various energy development or conservation scenarios. After consideration of a variety of approaches to integrated assessment at a regional level, Pacific Northwest Laboratories (PNL) has concluded that dynamic simulation techniques provide the best available approach to evaluating the issues pertinent to the Northwest. As a result, the PNW Regional Assessment Program has been structured in a framework involving ten sectors. Each of these sectors involve their own submodels that receive information either from outside the model as exogenous inputs or from other sector submodels

  10. Performance assessment overview for subseabed disposal of high level radioactive waste

    International Nuclear Information System (INIS)

    Klett, R.D.

    1997-06-01

    The Subseabed Disposal Project (SDP) was part of an international program that investigated the feasibility of high-level radioactive waste disposal in the deep ocean sediments. This report briefly describes the seven-step iterative performance assessment procedures used in this study and presents representative results of the last iteration. The results of the performance are compared to interim standards developed for the SDP, to other conceptual repositories, and to related metrics. The attributes, limitations, uncertainties, and remaining tasks in the SDP feasibility phase are discussed

  11. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tartakovsky, Guzel D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Timothy C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chronister, Glen B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-01

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  12. Development of a probabilistic safety assessment framework for an interim dry storage facility subjected to an aircraft crash using best-estimate structural analysis

    International Nuclear Information System (INIS)

    Almomani, Belal; Jang, Dong Chan; Lee, Sang Hoon; Kang, Hyun Gook

    2017-01-01

    Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research

  13. Development of a Probabilistic Safety Assessment Framework for an Interim Dry Storage Facility Subjected to an Aircraft Crash Using Best-Estimate Structural Analysis

    Directory of Open Access Journals (Sweden)

    Belal Almomani

    2017-03-01

    Full Text Available Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research.

  14. Development of a probabilistic safety assessment framework for an interim dry storage facility subjected to an aircraft crash using best-estimate structural analysis

    Energy Technology Data Exchange (ETDEWEB)

    Almomani, Belal; Jang, Dong Chan [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Lee, Sang Hoon [Dept. of Mechanical and Automotive Engineering, Keimyung University, Daegu (Korea, Republic of); Kang, Hyun Gook [Dept. of Mechanical, Aerospace and Nuclear Engineering, Rensselaer Polytechnic Institute, Troy (United States)

    2017-03-15

    Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research.

  15. Defense Acquisitions: Assessments of Selected Weapon Programs

    Science.gov (United States)

    2017-03-01

    Figure 17: Examples of Knowledge Scorecards 61 Page vi GAO-17-333SP Assessments of Selected Weapon Programs...programs. Page 61 GAO-17-333SP Assessments of Selected Weapon Programs Figure 17: Examples of Knowledge Scorecards Pursuant to a...had direct access to the USD AT&L and other senior acquisition officials, and some approval authorities were delegated to lower levels. For example

  16. Fuel supply shutdown facility interim operational safety requirements

    International Nuclear Information System (INIS)

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  17. Office of Academic Assessment provides workshops on the program assessment process

    OpenAIRE

    Williams, Meghan

    2008-01-01

    The Office of Academic Assessment is once again providing a series of workshops on the program assessment process during the spring semester. The workshops will offer a wide range of resources to assist faculty and administrators as they focus on teaching and learning in their programs.

  18. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    Science.gov (United States)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  19. In Situ Remediation Integrated Program: Evaluation and assessment of containment technology

    International Nuclear Information System (INIS)

    Gerber, M.A.; Fayer, M.J.

    1994-06-01

    Containment technology refers to a broad range of methods that are used to contain waste or contaminated groundwater and to keep uncontaminated water from entering a waste site. The U.S. Department of Energy's (DOE) Office of Technology Development has instituted the In Situ Remediation Integrated Program (ISRIP) to advance the state-of-the-art of innovative technologies that contain or treat, in situ, contaminated media such as soil and groundwater, to the point of demonstration and to broaden the applicability of these technologies to the widely varying site remediation requirements throughout the DOE complex. The information provided here is an overview of the state-of-the-art of containment technology and includes a discussion of ongoing development projects; identifies the technical gaps; discusses the priorities for resolution of the technical gaps; and identifies the site parameters affecting the application of a specific containment method. The containment technology described in this document cover surface caps; vertical barriers such as slurry walls, grout curtains, sheet pilings, frozen soil barriers, and vitrified barriers; horizontal barriers; sorbent barriers; and gravel layers/curtains. Within DOE, containment technology could be used to prevent water infiltration into buried waste; to provide for long-term containment of pits, trenches, and buried waste sites; for the interim containment of leaking underground storage tanks and piping; for the removal of contaminants from groundwater to prevent contamination from migrating off-site; and as an interim measure to prevent the further migration of contamination during the application of an in situ treatment technology such as soil flushing. The ultimate goal is the implementation of containment technology at DOE sites as a cost-effective, efficient, and safe choice for environmental remediation and restoration activities

  20. NASA Aviation Safety Program Systems Analysis/Program Assessment Metrics Review

    Science.gov (United States)

    Louis, Garrick E.; Anderson, Katherine; Ahmad, Tisan; Bouabid, Ali; Siriwardana, Maya; Guilbaud, Patrick

    2003-01-01

    The goal of this project is to evaluate the metrics and processes used by NASA's Aviation Safety Program in assessing technologies that contribute to NASA's aviation safety goals. There were three objectives for reaching this goal. First, NASA's main objectives for aviation safety were documented and their consistency was checked against the main objectives of the Aviation Safety Program. Next, the metrics used for technology investment by the Program Assessment function of AvSP were evaluated. Finally, other metrics that could be used by the Program Assessment Team (PAT) were identified and evaluated. This investigation revealed that the objectives are in fact consistent across organizational levels at NASA and with the FAA. Some of the major issues discussed in this study which should be further investigated, are the removal of the Cost and Return-on-Investment metrics, the lack of the metrics to measure the balance of investment and technology, the interdependencies between some of the metric risk driver categories, and the conflict between 'fatal accident rate' and 'accident rate' in the language of the Aviation Safety goal as stated in different sources.

  1. Marketing Prior Learning Assessment Programs.

    Science.gov (United States)

    Heeger, Gerald A.

    1983-01-01

    Experiential learning programs must be marketed effectively if they are to succeed. The formulation of market strategy is discussed including: strategic planning; identification of a market target; and development of a market mix. A commitment to marketing academic programs is seen as a commitment to self-assessment. (MW)

  2. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  3. 17 CFR 210.8-03 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial statements... AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Article 8 Financial Statements of...

  4. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  5. Outcomes Assessment in Dental Hygiene Programs.

    Science.gov (United States)

    Grimes, Ellen B.

    1999-01-01

    A survey of 22 dental-hygiene-program directors found that programs routinely and effectively assess student outcomes and use the information for program improvements and to demonstrate accountability. Both policy and faculty/administrative support were deemed important to implementation. Time constraints were a major barrier. Outcomes-assessment…

  6. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    Science.gov (United States)

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  7. Radioactivity standards distribution program, 1978--1979. Interim report, 1978--1979

    International Nuclear Information System (INIS)

    Ziegler, L.H.

    1978-06-01

    A program for the distribution of calibrated radioactive samples, as one function of EPA's quality assurance program for environmental radiation measurements, is described. Included is a discussion of the objectives of the distribution program and a description of the preparation, availability, and distribution of calibrated radioactive samples. Instructions and application forms are included for laboratories desiring to participate in the program. This document is not a research report. It is designed for use by personnel of laboratories participating or desiring to participate in the Radioactivity Standards Distribution Program, which is a part of the U.S. Environmental Protection Agency's quality assurance program

  8. Assessment of military population-based psychological resilience programs.

    Science.gov (United States)

    Morgan, Brenda J; Bibb, Sandra C Garmon

    2011-09-01

    Active duty service members' (ADSMs) seemingly poor adaptability to traumatic stressors is a risk to force health. Enhancing the psychological resilience of ADSMs has become a key focus of Department of Defense (DoD) leaders and the numbers of military programs for enhancing psychological resilience have increased. The purpose of this article is to describe the results of an assessment conducted to determine comprehensiveness of current psychological resilience building programs that target ADSMs. A modified six-step, population-based needs assessment was used to evaluate resilience programs designed to meet the psychological needs of the ADSM population. The assessment results revealed a gap in published literature regarding program outcomes. DoD leaders may benefit from targeted predictive research that assesses program effectiveness outcomes. The necessity of including preventive, evidence-based interventions in new programs, such as positive emotion interventions shown to enhance psychological resilience in civilian samples, is also recommended.

  9. Effectiveness of interim remedial actions at the Niagara Falls Storage Site

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Seay, W.M.; McNamee, E.

    1990-01-01

    There are 190,000 m 3 of contaminated soils, wastes, and residues stored at the Niagara Falls Storage Site (NFSS). The residues have a volume of 18,000 m 3 and contain about 1,930 Ci of 226 Ra, which accounts for most of the radioactivity. Since 1980, actions have been taken to minimize potential radiological risks and prevent radionuclide migration. Interim actions included capping vents, sealing pipes, relocating the perimeter fence (to limit radon risk), transferring and consolidating wastes, upgrading storage buildings, constructing a clay cutoff wall (to limit potential ground-water transport of contaminants), treating and releasing contaminated water, using a synthetic liner, and using an interim clay cap. An interim waste containment facility was completed in 1986. Environmental monitoring showed a decrease in radon concentrations and in external gamma radiation from 1982 to 1986; levels have been stable since 1986. Uranium and radium concentrations in surface water have decreased; very low concentrations have been detected in stream sediments, and concentrations in ground water have remained stable. Recent monitoring showed that NFSS is in compliance with the U.S. Department of Energy's (DOE's) radiation protection standards

  10. Arctic Nuclear Waste Assessment Program

    International Nuclear Information System (INIS)

    Edson, R.

    1995-01-01

    The Arctic Nuclear Waste Assessment Program (ANWAP) was initiated in 1993 as a result of US congressional concern over the disposal of nuclear materials by the former Soviet Union into the Arctic marine environment. The program is comprised of appr. 70 different projects. To date appr. ten percent of the funds has gone to Russian institutions for research and logistical support. The collaboration also include the IAEA International Arctic Seas Assessment Program. The major conclusion from the research to date is that the largest signals for region-wide radionuclide contamination in the Arctic marine environment appear to arise from the following: 1) atmospheric testing of nuclear weapons, a practice that has been discontinued; 2) nuclear fuel reprocessing wastes carried in the Arctic from reprocessing facilities in Western Europe, and 3) accidents such as Chernobyl and the 1957 explosion at Chelyabinsk-65

  11. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program...

  12. High-level waste melter alternatives assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B.

    1995-02-01

    This document describes the Tank Waste Remediation System (TWRS) High-Level Waste (HLW) Program`s (hereafter referred to as HLW Program) Melter Candidate Assessment Activity performed in fiscal year (FY) 1994. The mission of the TWRS Program is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and encapsulated strontium and cesium isotopic sources) in an environmentally sound, safe, and cost-effective manner. The goal of the HLW Program is to immobilize the HLW fraction of pretreated tank waste into a vitrified product suitable for interim onsite storage and eventual offsite disposal at a geologic repository. Preparation of the encapsulated strontium and cesium isotopic sources for final disposal is also included in the HLW Program. As a result of trade studies performed in 1992 and 1993, processes planned for pretreatment of tank wastes were modified substantially because of increasing estimates of the quantity of high-level and transuranic tank waste remaining after pretreatment. This resulted in substantial increases in needed vitrification plant capacity compared to the capacity of original Hanford Waste Vitrification Plant (HWVP). The required capacity has not been finalized, but is expected to be four to eight times that of the HWVP design. The increased capacity requirements for the HLW vitrification plant`s melter prompted the assessment of candidate high-capacity HLW melter technologies to determine the most viable candidates and the required development and testing (D and T) focus required to select the Hanford Site HLW vitrification plant melter system. An assessment process was developed in early 1994. This document describes the assessment team, roles of team members, the phased assessment process and results, resulting recommendations, and the implementation strategy.

  13. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  14. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  15. Development of a Computer Program (CASK) for the Analysis of Logistics and Transportation Cost of the Spent Fuels

    International Nuclear Information System (INIS)

    Cha, Jeong-Hun; Choi, Heui-Joo; Cho, Dong-Keun; Kim, Seong-Ki; Lee, Jong-Youl; Choi, Jong-Won

    2008-07-01

    The cost for the spent fuel management includes the costs for the interim storage, the transportation, and the permanent disposal of the spent fuels. The CASK(Cost and logistics Analysis program for Spent fuel transportation in Korea) program is developed to analyze logistics and transportation cost of the spent fuels. And the total amount of PWR spent fuels stored in four nuclear plant sites, a centralized interim storage facility near coast and a permanent disposal facility near the interim storage facility are considered in this program. The CASK program is developed by using Visual Basic language and coupled with an excel sheet. The excel sheet shows a change of logistics and transportation cost. Also transportation unit cost is easily changed in the excel sheet. The scopes of the report are explanation of parameters in the CASK program and a preliminary calculation. We have developed the CASK version 1.0 so far, and will update its parameters in transportation cost and transportation scenario. Also, we will incorporate it into the program which is used for the projection of spent fuels from the nuclear power plants. Finally, it is expected that the CASK program could be a part of the cost estimation tools which are under development at KAERI. And this program will be a very useful tool for the establishment of transportation scenario and transportation cost in Korean situations

  16. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  17. LDEF materials: An overview of the interim findings

    International Nuclear Information System (INIS)

    Stein, B.A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effect (SEE) on materials that are unparalleled in the history of the U.S. space program. The 5.8-year flight of LDEF greatly enhanced the potential value of materials data from LDEF to the international SEE community, compared to that of the original 1-year flight plan. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials of the same space vehicle. NASA recognized the potential by forming the LDEF Space Environmental Effects on Materials Special Investigation Group (MSIG) to address the greatly expanded materials and LEO space environment parameter analysis opportunities available in the LDEF structure, experiment trays, and corollary measurements, so that the combined value of all LDEF materials data to current and future space missions will be assessed and documented. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. These revelations are based on observations of LEO environmental effects on materials made in-space during LDEF retrieval and during LDEF tray deintegration at the Kennedy Space Center, and on findings of approximately 1.5 years of laboratory analyses of LDEF materials by the LDEF materials scientists. These findings were extensively reviewed and discussed at the MSIG-sponsored LDEF Materials Workshop '91. The results are presented in a format which categorizes the revelations as clear findings or confusing/unexplained findings and resultant needs for new space materials developments and ground simulation testing/analytical modeling

  18. Advanced Science for Kids: Multicultural Assessment and Programming.

    Science.gov (United States)

    Bettac, Teresa; Huckabee, Colleen; Musser, Louise; Patton, Paulette; Yates, Joyce

    1997-01-01

    Describes Advanced Science for Kids (ASK), a multicultural approach to assessment and programming for a middle school advanced science program. ASK is designed to provide alternative approaches to identification and assessment, facilitate authentic instruction and assessment, and provide minority students with academic and social support as they…

  19. Characterization of void volume VOC concentration in vented TRU waste drums - an interim report

    International Nuclear Information System (INIS)

    Liekhus, K.J.

    1994-09-01

    A test program is underway at the Idaho National Engineering Laboratory to determine if the concentration of volatile organic compounds (VOCs) in the drum headspace is representative of the VOC concentration in the entire drum void space and to demonstrate that the VOC concentration in the void space of each layer of confinement can be estimated using a model incorporating diffusion and permeation transport principles and limited waste drum sampling data. An experimental test plan was developed requiring gas sampling of 66 transuranic (TRU) waste drums. This interim report summarizes the experimental measurements and model predictions of VOC concentration in the innermost layer of confinement from waste drums sampled and analyzed in FY 1994

  20. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  1. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    International Nuclear Information System (INIS)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs

  2. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  3. Model for low temperature oxidation during long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne [Service de la Corrosion et du Comportement des Materiaux dans leur Environnement, CEA/Saclay - 91191 Gif-sur-Yvette Cedex (France); Poquillon, Dominique; Monceau, Daniel [CIRIMAT UMR 5085, ENSIACET-INPT, 31077 Toulouse Cedex 4 (France)

    2004-07-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  4. Model for low temperature oxidation during long term interim storage

    International Nuclear Information System (INIS)

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne; Poquillon, Dominique; Monceau, Daniel

    2004-01-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  5. Self-assessment program and actions in ANAV

    International Nuclear Information System (INIS)

    2004-01-01

    Since 1999, the Association Nuclear Asco-Vandellos II, AIE (ANAV) has a self-assessment program in place and controls and tracks the actions with the support of different databases. This article describes the improvements made in the self-assessment programs and actions of ANAV between 1999 up to the present, all the fruit of the experience gained in the application of these programs, Sector guidelines and international trends, as well as standardization with the other Spanish nuclear power plants. (Author)

  6. Ad interim legal remedy in case of large projects

    International Nuclear Information System (INIS)

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  7. Frequency and Type of Prosthetic Complications Associated with Interim, Immediately Loaded Full-Arch Prostheses: A 2-Year Retrospective Chart Review.

    Science.gov (United States)

    Drago, Carl

    2016-08-01

    The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary

  8. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Science.gov (United States)

    2010-10-01

    ... of such devices, shall be permitted in the passenger compartment. When the bus is at rest at a stop... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities...

  9. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Science.gov (United States)

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  10. Individual shareholders’ understanding of the content of interim reports of South African listed retail companies

    Directory of Open Access Journals (Sweden)

    Johan GI Oberholster

    2015-05-01

    Full Text Available A number of studies conducted, and reports published, by international and local accounting bodies have found that the proliferation of disclosures in financial reports has hampered users’ understanding of these reports. The reports by accounting bodies also indicate that these users prefer more concise financial reports. These findings, in conjunction with a dearth of recent questionnaire-based research on whether individual shareholders understand the content of financial reports, resulted in this study on whether individual shareholders understand the content of interim reports. The study provides empirical proof that a sound knowledge of business, accounting and economic matters is a prerequisite for understanding interim reports in the case of individual shareholders. The results of the study indicate that individual shareholders have a limited understanding of the content of interim reports as a whole, and that a good knowledge of business and economic matters and of accounting results in an improved understanding of the content of interim reports. In particular, specialisation in accounting in undergraduate and postgraduate degrees, professional qualifications, and work experience in the financial field improve the understanding of individual shareholders.

  11. Radiation detection technology assessment program (RADTAP)

    International Nuclear Information System (INIS)

    Smith, D.E.

    1998-01-01

    The U.S. Customs Service and the U.S. Department of Energy (DOE) conducted a technical and operational assessment of gamma ray radiation detection equipment during the period May 5-16, 1997 at a testing facility in North Carolina. The effort was entitled, ''Radiation Detection Technology Assessment Program (RADTAP)'', and was conducted for the purpose of assessing the applicability, sensitivity and robustness of a diverse suite of gamma ray detection and identification equipment for possible use by Customs and other law enforcement agencies. Thirteen companies entered 25 instruments into the assessment program. All detection equipment entered had to exhibit a minimum sensitivity of 20 micro-R per hour (background included) from a Cesium-137 point source. Isotope identifying spectrometers entered were man portable and operable at room temperature with read-out that could be interpreted by non-technical personnel. Radioactive sources used in the assessment included special nuclear material, industrial and health isotopes. Evaluators included Customs inspectors and technical experts from DOE and Customs. No conclusions or recommendations were issued based on the quantitative and qualitative test results, however, the results of the program provided law enforcement agencies with the necessary data to select equipment that best meets their operational needs and budgets. (author)

  12. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  13. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  14. Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri

    International Nuclear Information System (INIS)

    1993-05-01

    This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA

  15. Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

  16. High-level waste melter alternatives assessment report

    International Nuclear Information System (INIS)

    Calmus, R.B.

    1995-02-01

    This document describes the Tank Waste Remediation System (TWRS) High-Level Waste (HLW) Program's (hereafter referred to as HLW Program) Melter Candidate Assessment Activity performed in fiscal year (FY) 1994. The mission of the TWRS Program is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and encapsulated strontium and cesium isotopic sources) in an environmentally sound, safe, and cost-effective manner. The goal of the HLW Program is to immobilize the HLW fraction of pretreated tank waste into a vitrified product suitable for interim onsite storage and eventual offsite disposal at a geologic repository. Preparation of the encapsulated strontium and cesium isotopic sources for final disposal is also included in the HLW Program. As a result of trade studies performed in 1992 and 1993, processes planned for pretreatment of tank wastes were modified substantially because of increasing estimates of the quantity of high-level and transuranic tank waste remaining after pretreatment. This resulted in substantial increases in needed vitrification plant capacity compared to the capacity of original Hanford Waste Vitrification Plant (HWVP). The required capacity has not been finalized, but is expected to be four to eight times that of the HWVP design. The increased capacity requirements for the HLW vitrification plant's melter prompted the assessment of candidate high-capacity HLW melter technologies to determine the most viable candidates and the required development and testing (D and T) focus required to select the Hanford Site HLW vitrification plant melter system. An assessment process was developed in early 1994. This document describes the assessment team, roles of team members, the phased assessment process and results, resulting recommendations, and the implementation strategy

  17. Report on the long-term interim storage of spent fuels and vitrified wastes; Gutachten zur Langzeitzwischenlagerung abgebrannter Brennelemente und verglaster Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-03

    Long-term interim storage for several hundred years is an option on the management of high-level radioactive wastes. The decision on final disposal is postponed. Worldwide the long-term interim storage is not part of the disposal concept - a geologic final repository is the ultimate aim. Using today's technology the interim storage over several hundred years is supposed to be uncritical. Aging management is the most important challenge - the renewal of the facilities would have to be expected. Possible social change and their impact on the interim storage problem has not been considered.

  18. Czech interim spent fuel storage facility: operation experience, inspections and future plans

    International Nuclear Information System (INIS)

    Fajman, V.; Bartak, L.; Coufal, J.; Brzobohaty, K.; Kuba, S.

    1999-01-01

    The paper describes the situation in the spent fuel management in the Czech Republic. The interim Spent Fuel Storage Facility (ISFSF) at Dukovany, which was commissioned in January 1997 and is using dual transport and storage CASTOR - 440/84 casks, is briefly described. The authors deal with their experience in operating and inspecting the ISFSF Dukovany. The structure of the basic safety document 'Limits and Conditions of Normal Operation' is also mentioned, including the experience of the performance. The inspection activities focused on permanent checking of the leak tightness of the CASTOR 440/84 casks, the maximum cask temperature and inspections monitoring both the neutron and gamma dose rate as well as the surface contamination. The results of the inspections are mentioned in the presentation as well. The operator's experience with re-opening partly loaded and already dried CASTOR-440/84 cask, after its transport from NPP Jaslovske Bohunice to the NPP Dukovany is also described. The paper introduces briefly the concept of future spent fuel storage both from the NPP Dukovany and the NPP Temelin, as prepared by the CEZ. The preparatory work for the Central Interim Spent Nuclear Fuel Storage Facility (CISFSF) in the Czech Republic and the information concerning the planned storage technology for this facility is discussed in the paper as well. The authors describe the site selection process and the preparatory steps concerning new spent fuel facility construction including the Environmental Impact Assessment studies. (author)

  19. Laboratory Cooperative Program: an assessment

    International Nuclear Information System (INIS)

    1979-11-01

    The Laboratory Cooperative Program (Lab Coop Program) was initiated by the US AEC over 20 years ago to promote the transfer of technical information from the national laboratories to the academic community utilizing the facilities and staff capabilities of the labs. Under the AEC, ERDA and DOE, the goals of the program have broadened gradually. Therefore, the program was examined to determine the extent to which it contributes to the current objectives of the DOE and to develop recommendations for any program changes. The assessment of the Lab Coop Program was based on a combination of review of program activity data and publications, review of general information regarding laboratory operations, and extensive interviews. The major findings of this evaluation were that: the program lacks a clear statement of purpose; program plans, priorities, and procedures are not explicit and operations tend to follow historical patterns; and the program is generally accepted as beneficial, but its benefits are difficult to quantify. It is recommended that the focus of the Lab Coop Program be limited and clearly defined, that performance plans be developed and measured against accomplishments, and that a national informational effort be initiated

  20. Assessment of the Fusion Energy Sciences Program. Final Report

    International Nuclear Information System (INIS)

    2001-01-01

    An assessment of the Office of Fusion Energy Sciences (OFES) program with guidance for future program strategy. The overall objective of this study is to prepare an independent assessment of the scientific quality of the Office of Fusion Energy Sciences program at the Department of Energy. The Fusion Science Assessment Committee (FuSAC) has been appointed to conduct this study

  1. MRI assessment program

    International Nuclear Information System (INIS)

    1987-09-01

    The MRI Assessment Program involves installation and operation of five MRI units in Australian public hospitals and the evaluation at each unit of the cost and efficacy of the technology over a period of two years. This first report in a series presents preliminary usage and cost data for the year to 30 June 1987 as well as describing the background and the data set. 6 figs., tabs

  2. NRC performance assessment program

    International Nuclear Information System (INIS)

    Coplan, S.M.

    1986-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  3. TRU Waste Management Program. Cost/schedule optimization analysis

    International Nuclear Information System (INIS)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions

  4. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  5. 78 FR 48035 - Conservation Reserve Program, Re-Enrollment

    Science.gov (United States)

    2013-08-07

    ... longstanding USDA policy and existing handbooks. This technical amendment did not require Office of Management... Reserve Program (CRP) regulations to clarify that land with use restrictions that prohibit the production... other deed restrictions that restrict the production of agricultural commodities. A 2003 interim rule...

  6. A Procedure for Structural Weight Estimation of Single Stage to Orbit Launch Vehicles (Interim User's Manual)

    Science.gov (United States)

    Martinovic, Zoran N.; Cerro, Jeffrey A.

    2002-01-01

    This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.

  7. Sacramento Municipal Utility district's interim onsite storage building for low level radioactive waste

    International Nuclear Information System (INIS)

    Gillis, E.

    1986-01-01

    In order to meet current and anticipated needs for the low level radwaste management program at the Rancho Seco Nuclear Generating Station, the Sacramento Municipal Utility District has a design and construction program underway which will provide an onsite interim storage facility that can be expanded in two and one-half year increments. The design approach utilized allows capital investment to be minimized and still provides radwaste management flexibility in anticipation of delays in resolution of the nationwide long term radwaste disposal situation. The facility provides storage and material accountability for all low level radwastes generated by the plant. Wastes are segregated by radioactivity level and are stored in two separate storage areas located within one facility. Lower activity wastes are stored in a lightly shielded structure and handled by lift trucks, while the higher activity wastes are stored in a highly shielded structure and handled remotely by manual bridge crane. The layout of the structure provides for economy of operation and minimizes personnel radiation exposure. Design philosophy and criteria, building layout and systems, estimated costs and construction schedule are discussed

  8. Strengthening Chronic Disease Prevention Programming: the Toward Evidence-Informed Practice (TEIP) Program Assessment Tool

    Science.gov (United States)

    Albert, Dayna; Fortin, Rebecca; Lessio, Anne; Herrera, Christine; Hanning, Rhona; Rush, Brian

    2013-01-01

    Best practices identified solely on the strength of research evidence may not be entirely relevant or practical for use in community-based public health and the practice of chronic disease prevention. Aiming to bridge the gap between best practices literature and local knowledge and expertise, the Ontario Public Health Association, through the Toward Evidence-Informed Practice initiative, developed a set of resources to strengthen evidence-informed decision making in chronic disease prevention programs. A Program Assessment Tool, described in this article, emphasizes better processes by incorporating review criteria into the program planning and implementation process. In a companion paper, “Strengthening Chronic Disease Prevention Programming: The Toward Evidence-Informed Practice (TEIP) Program Evidence Tool,” we describe another tool, which emphasizes better evidence by providing guidelines and worksheets to identify, synthesize, and incorporate evidence from a range of sources (eg, peer-reviewed literature, gray literature, local expertise) to strengthen local programs. The Program Assessment Tool uses 19 criteria derived from literature on best and promising practices to assess and strengthen program planning and implementation. We describe the benefits, strengths, and challenges in implementing the tool in 22 community-based chronic disease prevention projects in Ontario, Canada. The Program Assessment Tool helps put best processes into operation to complement adoption and adaptation of evidence-informed practices for chronic disease prevention. PMID:23721789

  9. Assessing the effects of employee assistance programs: a review of employee assistance program evaluations.

    OpenAIRE

    Colantonio, A.

    1989-01-01

    Employee assistance programs have grown at a dramatic rate, yet the effectiveness of these programs has been called into question. The purpose of this paper was to assess the effectiveness of employee assistance programs (EAPs) by reviewing recently published EAP evaluations. All studies evaluating EAPs published since 1975 from peer-reviewed journals in the English language were included in this analysis. Each of the articles was assessed in the following areas: (a) program description (subj...

  10. Methodology for Environmental Impact Assessment; Metodik foer miljoekonsekvensbedoemning

    Energy Technology Data Exchange (ETDEWEB)

    Malmlund, Anna (Structor Miljoebyraan Stockholm AB (Sweden))

    2010-12-15

    This report is an appendix to 'Environmental Impact Assessment Interim storage, encapsulation and disposal of spent nuclear fuel'. The appendix presents the methodology and criteria used in support investigations to conduct impact assessments.

  11. Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Timothy C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chronister, Glen B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This is an interim report including about 2 years of post-desiccation monitoring data.

  12. Assessment of the NRC Enforcement Program

    International Nuclear Information System (INIS)

    Lieberman, J.; Coblentz, L.

    1995-04-01

    On May 12, 1994, the Executive Director for Operations (EDO) established a Review Team composed of senior NRC managers to re-examine the NRC enforcement program. A copy of the Review Team's charter is enclosed as Appendix A. This report presents the Team's assessment. The purpose of this review effort are: (1) to perform an assessment of the NRC's enforcement program to determine whether the defined purposes of the enforcement program are appropriate; (2) to determine whether the NRC's enforcement practices and procedures for issuing enforcement actions are consistent with those purposes; and (3) to provide recommendations on any changes the Review Team believes advisable. In accordance with its charter, the Review Team considered the following principal issues in conducting its assessment of the enforcement program: the balance between providing deterrence and incentives (both positive and negative) for the identification and correction of violations; the appropriateness of NRC sanctions; whether the commission should seek statutory authority to increase the amount of civil penalties; whether the NRC should use different enforcement policies and practices for different licensees (e.g., materials licensees in contrast to power reactors or large fuel facilities); and whether the commission should establish open enforcement conferences as the normal practice

  13. Retrievable surface storage: interim storage of solidified high-level waste

    International Nuclear Information System (INIS)

    LaRiviere, J.R.; Nelson, D.C.

    1976-01-01

    Studies have been conducted on retrievable-surface-storage concepts for the interim storage of solidified high-level wastes. These studies have been reviewed by the Panel on Engineered Storage, convened by the Committee on Radioactive Waste Management of the National Research Council-National Academy of Sciences. The Panel has concluded that ''retrievable surface storage is an acceptable interim stage in a comprehensive system for managing high-level radioactive wastes.'' The scaled storage cask concept, which was recommended by the Panel on Engineered Storage, consists of placing a canister of waste inside a carbon-steel cask, which in turn is placed inside a thick concrete cylinder. The waste is cooled by natural convection air flow through an annulus between the cask and the inner wall of the concrete cylinder. The complete assembly is placed above ground in an outdoor storage area

  14. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  15. The use of Deauville criteria in follow-up assessment of response to therapy in extra-nodal Non-Hodgkin's lymphoma

    Directory of Open Access Journals (Sweden)

    Manar Hussein Abdel-Sattar

    2018-03-01

    Full Text Available Objective: Our aim was evaluate the role the PET/CT in the assessment of response to therapy in patients with Non-Hodgkin extra-nodal lymphoma: in particular, a five-point scale (Deauville criteria, which can be employed for early- and late-therapeutic response assessment. Methods: Sixty patients with pathologically confirmed Non-Hodgkin lymphoma (NHL were enrolled in this prospective study. All patients underwent the following PET/CT examinations: initial PET/CT for staging, interim PET/CT and end of treatment PET/CT. Response assessment was done using new Cheson’s guidelines and five-point scale (Deauville criteria. Results: All patients were evaluated for response to therapy in the early interim, followed by late interim, as well as end treatment assessment for the overall response. We found good concordance of response assessment according to the Deauville criteria classification with International Harmonization Project (IHP classification. After early interim 48/60 patients had concordant designations (91.7%, 83.3%, 70%, and 33.3% and 12 patients had discordant designations. After late interim, 56/60 patients had concordant designations (100%, 100%, 80%, and 50% and four patients had discordant designations. After end of treatment, 54/60 patients had concordant designations (100%, 100% and 71.4% and six patients has discordant designations. Conclusion: Response assessment according to the Deauville criteria classification showed good concordance with IHP classification. According to our findings, we recommend the use of Deauville criteria in reporting of PET/CT for staging and assessment of response to treatment. Keywords: PET/CT, Extranodal non-hodgkin lymphoma, Deauville criteria, IHP (International Harmonizing Project

  16. A Case Study in Citizen Science: The Effectiveness of a Trap-Neuter-Return Program in a Chicago Neighborhood

    Directory of Open Access Journals (Sweden)

    Daniel D. Spehar

    2018-01-01

    Full Text Available The use of trap-neuter-return (TNR as a method of managing free-roaming cat populations has increased in the United States in recent decades. Historically, TNR has been conducted most often at a grassroots level, which has led to inconsistent data collection and assessment practices. Consequently, a paucity of analyzable data exists. An initiative is underway to standardize TNR program data collection and assessment. However, it could be some time before scientifically sound protocols are implemented on a broad scale. In the interim, sets of data collected by nascent citizen scientists offer valid opportunities to evaluate grassroots TNR programs. The purpose of the present study was to examine the effectiveness of a TNR program conducted by a citizen scientist located in Chicago, Illinois, where a county law permitting TNR was enacted in 2007. Colony populations, when grouped by the number of years enrolled in the program, declined by a mean of 54% from entry and 82% from peak levels. Results from coexistent TNR programs in the Chicago area are consistent with these findings.

  17. Assessment of Student Outcomes in Undergraduate Health Information Administration Programs

    OpenAIRE

    Smith, Jody

    2006-01-01

    The purpose of this research was to a) determine what assessment methods are being used in undergraduate health information administration programs to assess student learning and the usefulness of those methods, b) determine to what extent programs have incorporated good student learning assessment practices. Programs use a variety of assessment tools to measure student learning; the most useful include assessments by the professional practice supervisor, course tests, assignments, presentati...

  18. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    International Nuclear Information System (INIS)

    Shimizu, Masashi; Hayashi, Makoto; Kashiwakura, Jun

    2003-01-01

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  19. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  20. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  1. 78 FR 59866 - New Car Assessment Program (NCAP)

    Science.gov (United States)

    2013-09-30

    ... further commented that additional consideration should be given to autonomous vehicle controls that may... [Docket No. NHTSA-2013-0076] New Car Assessment Program (NCAP) AGENCY: National Highway Traffic Safety... Car Assessment Program (NCAP) that the agency announced in its June 26, 2013 request for comments (78...

  2. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Science.gov (United States)

    2010-01-01

    ... LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.109 Reimbursement of general funds and... replace interim financing used to finance equipment and facilities that were included in an RUS-approved...

  3. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  4. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  5. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  6. Assessing a GTA professional development program

    OpenAIRE

    Alicea-Muñoz, Emily; Masip, Joan Espar; Sullivan, Carol Subiño; Schatz, Michael F.

    2018-01-01

    For the last four years, the School of Physics at Georgia Tech have been preparing new Graduate Teaching Assistants (GTAs) through a program that integrates pedagogy, physics content, and professional development strategies. Here we discuss various assessments we have used to evaluate the program, among them surveys, GTA self-reporting, and end-of-semester student evaluations. Our results indicate that GTAs who participate in the program find its practical activities useful, feel better prepa...

  7. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ...? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Safety Management Certificate: what is it and when can it be used? 96.360 Section 96.360 Navigation and Navigable Waters COAST...

  8. Harvard University Program on Technology and Society 1964-1972. A Final Review.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Program on Technology and Society.

    Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…

  9. Manipulation of natural subsurface processes: Field research and validation. Interim report

    International Nuclear Information System (INIS)

    Fruchter, J.S.; Spane, F.A.; Amonette, J.E.

    1994-11-01

    Often the only alternative for treating deep subsurface contamination is in situ manipulation of natural processes to change the mobility or form of contaminants. However, the complex interactions of natural subsurface physical, chemical, and microbial processes limit the predictability of the system-wide impact of manipulation based on current knowledge. This report is a summary of research conducted to examine the feasibility of controlling the oxidation-reduction (redox) potential of the unconfined aquifer at the Hanford Site in southeastern Washington State by introducing chemical reagents and microbial nutrients. The experiment would allow the testing of concepts and hypotheses developed from fundamental research in the US Department of Energy's (DOE's) Subsurface Science Program. Furthermore, the achievement of such control is expected to have implications for in situ remediation of dispersed aqueous contaminants in the subsurface environment at DOE sites nationwide, and particularly at the Hanford Site. This interim report summarizes initial research that was conducted between July 1990 and October 1991

  10. Recommendations concerning an interim annual individual exposure limit for respirable quartz

    International Nuclear Information System (INIS)

    Stocker, H.; Horvath, F.J.; Napier, W.

    1983-07-01

    This paper presents AECB staff recommendations on the desirability of an annual individual occupational exposure limit for respirable quartz and on the magnitude of this limit, for uranium miners. Justifications are presented for the magnitude of this suggested limit for respirable quartz, drawing on experience gained in Ontario uranium and non-uranium mines and on that in other countries. The suggestion is made that an exposure limit be set for an interim period in order that additional information on the adequacy of the magnitude of the limit may be acquired. To complement the suggested exposure limit, it is proposed that a co-existing control program of action levels, to be triggered at various respirable quartz concentrations, be set up. It is the contention of this paper that the degree of protection afforded to individuals by the suggested exposure limit would be equivalent to the time-weighted average threshold limit value derived from recommendations, based on group average exposures, of the American Conference of Governmental Industrial Hygienists

  11. Interim results from UO2 fuel oxidation tests in air

    International Nuclear Information System (INIS)

    Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j.

    1987-08-01

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO 2 , fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO 2 pellets in the temperature range of 135 to 250 0 C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10 5 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10 5 R/h gamma field. 33 refs., 51 figs., 6 tabs

  12. Navy radon assessment and mitigation program: Final report

    International Nuclear Information System (INIS)

    1994-10-01

    This final report encompasses the events from the beginning of the Navy Radon Assessment and Mitigation Program to the closure of the program on October 31, 1994. Included in the report are discussions of the phases of the program including screening, assessment, mitigation, and post-mitigation. The primary discussion involves screening and assessment. The report addresses recommendations made to the Naval Facilities Engineering Command by the Hazardous Waste Remedial Actions Program of Martin Marietta Energy Systems, Inc., and the final decisions that were made. Special emphasis is placed on quality assurance/quality control (QA/QC), since QA/QC was given top priority during the implementation of this program. Included in the discussion on QA/QC are ana overview of the measurement process, positive and negative controls, replicated measurements, and application of chamber exposures to data calibration. The report concludes with a discussion of testing considerations for naval facilities and radon mitigation considerations for the Department of the Navy

  13. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  14. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  15. High-temperature flaw assessment procedure

    International Nuclear Information System (INIS)

    Ruggles, M.B.; Takahashi, Y.; Ainsworth, R.A.

    1989-08-01

    The current program represents a joint effort between the Electric Power Research Institute (EPRI) in the USA, the Central Research Institute of Electric Power Industry (CRIEPI) in Japan, and the Central Electricity Generating Board (CEGB) in the UK. The goal is to develop an interim high-temperature flaw assessment procedure for high-temperature reactor components. This is to be accomplished through exploratory experimental and analytical studies of high-temperature crack growth. The state-of-the-art assessment and the fracture mechanics database for both types 304 and 316 stainless steels, completed in 1988, serve as a foundation for the present work. Work in the three participating organizations is progressing roughly on schedule. Results to-date are presented in this document. Fundamental tests results are discussed in Section 2. Section 3 focuses on results of exploratory subcritical crack growth tests. Progress in subcritical crack growth modeling is reported in Section 4. Exploratory failure tests are outlined in Section 5. 21 refs., 70 figs., 7 tabs

  16. Assessing Program Learning Objectives to Improve Undergraduate Physics Education

    Science.gov (United States)

    Menke, Carrie

    2014-03-01

    Our physics undergraduate program has five program learning objectives (PLOs) focusing on (1) physical principles, (2) mathematical expertise, (3) experimental technique, (4) communication and teamwork, and (5) research proficiency. One PLO is assessed each year, with the results guiding modifications in our curriculum and future assessment practices; we have just completed our first cycle of assessing all PLOs. Our approach strives to maximize the ease and applicability of our assessment practices while maintaining faculty's flexibility in course design and delivery. Objectives are mapped onto our core curriculum with identified coursework collected as direct evidence. We've utilized mostly descriptive rubrics, applying them at the course and program levels as well as sharing them with the students. This has resulted in more efficient assessment that is also applicable to reaccreditation efforts, higher inter-rater reliability than with other rubric types, and higher quality capstone projects. We've also found that the varied quality of student writing can interfere with our assessment of other objectives. This poster outlines our processes, resources, and how we have used PLO assessment to strengthen our undergraduate program.

  17. Indoor temperature changes after retrofit: inferences based on electricity billing data for nonparticipants and participants in the BPA Residential Weatherization Program

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; White, D.

    1985-07-01

    This report discusses changes in indoor temperatures in response to retrofit improvements. The data on which this analysis is based are from an evaluation of the Bonneville Power Administration (BPA) interim Residential Weatherization Program. The BPA program, operated through participating private and public utilities throughout the Pacific Northwest, offered financial assistance (generally a cash rebate) to encourage installation of energy-efficiency improvements to existing homes in the region. These retrofits included attic, wall, floor and heating duct insulation; storm windows and doors; clock thermostats; and caulking and weatherstripping. This program, which operated during 1982 and 1983, weatherized 104 thousand homes at a total cost to BPA of $157 million. In mid-1983, staff at Oak Ridge National Laboratory and Evaluation Research Corporation began an evaluation of the BPA program. The primary focus of this evaluation was assessment of the actual electricity saving that can be attributed to the program (Hirst, et al., 1985). These savings estimates were used to help assess the economic attractiveness of the program to participants, the BPA power system, and the Pacific Northwest region as a whole.

  18. International Code Assessment and Applications Program: Annual report

    International Nuclear Information System (INIS)

    Ting, P.; Hanson, R.; Jenks, R.

    1987-03-01

    This is the first annual report of the International Code Assessment and Applications Program (ICAP). The ICAP was organized by the Office of Nuclear Regulatory Research, United States Nuclear Regulatory Commission (USNRC) in 1985. The ICAP is an international cooperative reactor safety research program planned to continue over a period of approximately five years. To date, eleven European and Asian countries/organizations have joined the program through bilateral agreements with the USNRC. Seven proposed agreements are currently under negotiation. The primary mission of the ICAP is to provide independent assessment of the three major advanced computer codes (RELAP5, TRAC-PWR, and TRAC-BWR) developed by the USNRC. However, program activities can be expected to enhance the assessment process throughout member countries. The codes were developed to calculate the reactor plant response to transients and loss-of-coolant accidents. Accurate prediction of normal and abnormal plant response using the codes enhances procedures and regulations used for the safe operation of the plant and also provides technical basis for assessing the safety margin of future reactor plant designs. The ICAP is providing required assessment data that will contribute to quantification of the code uncertainty for each code. The first annual report is devoted to coverage of program activities and accomplishments during the period between April 1985 and March 1987

  19. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  20. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  1. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  2. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  3. Peer Review of the Waste Package Material Performance Interim Report

    International Nuclear Information System (INIS)

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-01-01

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis

  4. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  5. Overview of management programs for plutonium-contaminated solid waste in the U.S.A

    International Nuclear Information System (INIS)

    Ramsey, R.W. Jr.; Daly, G.H.

    1975-01-01

    Programs for transuranium-contaminated solid wastes (TRU) in the U.S.A. are emphasizing a reduction in waste generation and the development of appropriate treatments to reduce the volume of wastes requiring interim storage and final disposal. Research and Development is emphasizing the establishment of sufficient information on treatment, hazards and storage to adopt a standardized procedure for handling wastes during an interim retrievable period and for final disposal. Federal responsibility for TRU waste is being proposed except for minimum amounts acceptable for commercial burial

  6. Argonne program to assess superconducting stability

    International Nuclear Information System (INIS)

    Wang, S.T.; Turner, L.R.; Huang, Y.C.; Dawson, J.W.; Harrang, J.; Hilal, M.A.; Lieberg, M.; Gonczy, J.D.; Kim, S.H.

    1978-01-01

    To assess superconductor stability, a complete program is developed to obtain basic information on the effects of local mechanical perturbations on the cryostatic stability. An analytical model for computing the transient recovery following the mechanical perturbation is developed. A test program is undertaken to develop data needed to verify the conclusions reached through the analytical studies

  7. BE (fuel element)/ZL (interim storage facility) module. Constituents of the fuel BE data base for BE documentation with respect to the disposal planning and the support of the BE container storage administration

    International Nuclear Information System (INIS)

    Hoffmann, V.; Deutsch, S.; Busch, V.; Braun, A.

    2012-01-01

    The securing of spent fuel element disposal from German nuclear power plants is the main task of GNS. This includes the container supply and the disposal analysis and planning. Therefore GNS operates a data base comprising all in Germany implemented fuel elements and all fuel element containers in interim storage facilities. With specific program modules the data base serves an optimized repository planning for all spent fuel elements from German NPPS and the supply of required data for future final disposal. The data base has two functional models: the BE (fuel element) and the ZL (interim storage) module. The contribution presents the data structure of the modules and details of the data base operation.

  8. Five-year interim report of the United States-Mexico Transboundary Aquifer Assessment Program: 2007--2012

    Science.gov (United States)

    Alley, William M.

    2013-01-01

    Transboundary aquifers are an essential, and in many cases, singular source of water for United States – Mexico border communities, particularly in arid regions. Declining water levels, deteriorating water quality, and increasing use of groundwater resources by municipal, industrial, and agricultural water users on both sides of the international border have raised concerns about the long-term availability of this supply. Water quantity and quality are determining and limiting factors that ultimately control agriculture, future economic development, population growth, human health, and ecological conditions along the border. Knowledge about the extent, depletion rates, and quality of transboundary aquifers, however, is limited and, in some areas, completely absent. The U.S. – Mexico Transboundary Aquifer Assessment Act (Public Law 109-448), referred to in this report as “the Act,” was signed into law by the President of the United States on December 22, 2006, to conduct binational scientific research to systematically assess priority transboundary aquifers and to address water information needs of border communities. The Act authorizes the Secretary of the Interior, through the U.S. Geological Survey (USGS), to collaborate with the States of Arizona, New Mexico, and Texas through their Water Resources Research Institutes (WRRIs) and with the International Boundary and Water Commission (IBWC), stakeholders, and Mexican counterparts to provide new information and a scientific foundation for State and local officials to address pressing water-resource challenges along the U.S. – Mexico border.

  9. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Science.gov (United States)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  10. Acceptance criteria for interim dry storage of aluminum-clad fuels

    International Nuclear Information System (INIS)

    Sindelar, R.L.; Peacock, H.B. Jr.; Iyer, N.C.; Louthan, M.R. Jr.

    1994-01-01

    Direct repository disposal of foreign and domestic research reactor fuels owned by the United States Department of Energy is an alternative to reprocessing (together with vitrification of the high level waste and storage in an engineered barrier) for ultimate disposition. Neither the storage systems nor the requirements and specifications for acceptable forms for direct repository disposal have been developed; therefore, an interim storage strategy is needed to safely store these fuels. Dry storage (within identified limits) of the fuels received from wet-basin storage would avoid excessive degradation to assure post-storage handleability, a full range of ultimate disposal options, criticality safety, and provide for maintaining confinement by the fuel/clad system. Dry storage requirements and technologies for US commercial fuels, specifically zircaloy-clad fuels under inert cover gas, are well established. Dry storage requirements and technologies for a system with a design life of 40 years for dry storage of aluminum-clad foreign and domestic research reactor fuels are being developed by various groups within programs sponsored by the DOE

  11. Meta-Review: Systematic Assessment of Program Review

    Science.gov (United States)

    Harlan, Brian

    2012-01-01

    Over 20 years ago, Robert J. Barak and Barbara E. Breier suggested incorporating a regular assessment of the entire program review system into the review schedule in order to ensure that the system itself is as efficient and effective as the programs under review. Barak and Breier's seminal book on the goals and processes of program review has…

  12. Retaining minorities in engineering: Assessment of a program prototype

    Science.gov (United States)

    Good, Jennifer Marie (Phillips)

    Program assessment is an essential part of healthy program development. Assessment should include multiple considerations, dimensions, and outcomes that match the program's objectives. As a newly formed retention program, the Auburn University Minority Engineering Program, designed to help pre-engineering minority students make the transition into their freshman year of university studies, incorporated evaluation and assessment into all three components of the program (the interactive learning laboratory, critical-thinking workshops, and Sunday-evening tutorials) from the program's inception. If students successfully adapted to the university environment and the demands of the pre-engineering course of study, then retention of minority students in the College of Engineering should improve. Data were gathered on the students involved in the various program components. Students who entered the Minority Engineering Program were pre- and posttested on three standardized subtests (critical thinking, mathematics, and science reasoning) of the Collegiate Assessment of Academic Proficiency. The first-quarter grade-point averages of the students were also gathered to compare their grades to freshman students in previous quarters within the College of Engineering. Qualitative data were also gathered on this same group of students. An analysis of the data revealed that student achievement is affected by involvement in the Minority Engineering Program. Specifically, the first quarter grade point averages of students involved in the program exceeded those of their peers in earlier years of study prior to the program's existence. In addition, mathematics and science reasoning scores on standardized tests increased pre- to postintervention. Comments collected in journals and files also demonstrated use of critical-thinking and problem-solving skills employed by the students. Recommendations for alterations of the program were made based on the outcome of the program evaluation

  13. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  14. Groundwater quality assessment plan for single-shell tank waste management Area U at the Hanford Site

    International Nuclear Information System (INIS)

    FN Hodges; CJ Chou

    2000-01-01

    Waste Management Area U (WMA U) includes the U Tank Farm, is currently regulated under RCRA interim-status regulations, and is scheduled for closure probably post-2030. Groundwater monitoring has been under an evaluation program that compared general contaminant indicator parameters from downgradient wells to background values established from upgradient wells. One of the indicator parameters, specific conductance, exceeded its background value in one downgradient well triggering a change from detection monitoring to a groundwater quality assessment program. The objective of the first phase of this assessment program is to determine whether the increased concentrations of nitrate and chromium in groundwater are from WMA U or from an upgradient source. Based on the results of the first determination, if WMA U is not the source of contamination, then the site will revert to detection monitoring. If WMA U is the source, then a second part of the groundwater quality assessment plan will be prepared to define the rate and extent of migration of contaminants in the groundwater and their concentrations

  15. Safety Consideration for a Wet Interim Spent Fuel Store at Conceptual Design Stage

    International Nuclear Information System (INIS)

    Astoux, Marion

    2014-01-01

    EDF Energy plans to build and operate two UK EPRs at the Hinkley Point C (HPC) site in Somerset, England. Spent fuel from the UK EPRs will need to be managed from the time it is discharged from the reactor until it is ultimately disposed of and this will involve storing the spent fuel for a period in the fuel building and thereafter in a dedicated interim facility until it can be emplaced within the UK Geological Disposal Facility. EDF Energy has proposed that this interim store should be located on the Hinkley Point site which is consistent with UK policy. This Interim Spent Fuel Store (ISFS) will have the capability to store for at least one hundred years the spent fuel arising from the operation of the two EPR units (sixty years operation). Therefore, specificities regarding the lifetime of the facility have to be accounted for its design. The choice of interim storage technology was considered in some depth for the HPC project and wet storage (pool) was selected. The facility is currently at conceptual design stage, although its construction will be part of main site construction phase. Safety functions and safety requirements for this storage facility have been defined, in compliance with WENRA 'Waste and Spent Fuel Storage - Safety Reference Level Report' and IAEA Specific Safety Guide no. 15 'Storage of Spent Nuclear Fuel'. EDF technical know-how, operational feedback on existing storage pools, UK regulatory context and Fukushima experience feedback have also been accounted for. Achievement of the safety functions as passively as reasonably practicable is a key issue for the design, especially in accident situations. Regarding lifetime aspects, ageing management of equipments, optimisation of the refurbishment, climate change, passivity of the facility, and long-term achievement of the safety functions are among the subjects to consider. Adequate Operational Limits and Conditions will also have to be defined, to enable the long-term achievement of the safety

  16. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    Directory of Open Access Journals (Sweden)

    Vivekanandhan Ramkumar

    2013-01-01

    Full Text Available Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects.

  17. Basis for Interim Operation for the K-Reactor in Cold Standby

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  18. Basis for Interim Operation for the K-Reactor in Cold Standby

    International Nuclear Information System (INIS)

    Shedrow, B.

    1998-01-01

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993)

  19. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    Energy Technology Data Exchange (ETDEWEB)

    Lamolla, Meritxell Martell [MERIENCE Strategic Thinking, 08734 Olerdola, Barcelona (Spain)

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. This paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)

  20. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository