WorldWideScience

Sample records for program guide schedule

  1. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    Science.gov (United States)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  2. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  3. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  4. A linear program for assessing the assignment and scheduling of radioactive wastes for disposal to sea

    International Nuclear Information System (INIS)

    Hutchinson, W.

    1983-04-01

    The report takes the form of a user guide to a computer program using linear programming techniques to aid the assignment and scheduling of radioactive wastes for disposal to sea. The program is aimed at the identification of 'optimum' amounts of each waste stream for disposal to sea without violating specific constraints values and/or fairness parameters. (author)

  5. Employer Child Care Resources: A Guide to Developing Effective Child Care Programs and Policies.

    Science.gov (United States)

    Women's Bureau (DOL), Washington, DC.

    Increasing numbers of employers are responding to employee child care needs by revising their benefit packages, work schedules, and recruitment plans to include child care options. This guide details ways to develop effective child care programs and policies. Section 1 of the guide describes employees' growing child care needs and employers'…

  6. On program restructuring, scheduling, and communication for parallel processor systems

    Energy Technology Data Exchange (ETDEWEB)

    Polychronopoulos, Constantine D. [Univ. of Illinois, Urbana, IL (United States)

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.

  7. Monterey Bay Aquarium Volunteer Guide Scheduling Analysis

    Science.gov (United States)

    2014-12-01

    TERMS 15. NUMBER OF Monterey Bay Aquarium, linear programing, network design, multi commodity flow, resilience PAGES 17. SECURITY 18. SECURITY...Volunteers fill many roles that include Aquarium guides, information desk attendants, divers, and animal caregivers . Julie Packard, Executive Director of...further analyze the resiliency of the shifts to changes in staffing levels caused by no-shows or drop-ins. 3 While the guide program managers have

  8. Master schedule for CY-1981 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites

  9. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  10. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  11. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  12. Disallowing Same-program Co-schedules to Improve Efficiency in Quad-core Servers

    OpenAIRE

    de Blanche, Andreas; Lundqvist, Thomas

    2017-01-01

    Programs running on different cores in a multicore server are often forced to share resources like off-chip memory, caches, I/O devices, etc. This resource sharing often leads to degraded performance, a slowdown, for the programs that share the resources. A job scheduler can improve performance by co-scheduling programs that use different resources on the same server. The most common approach to solve this co-scheduling problem has been to make job-schedulers resource aware, finding ways to c...

  13. Locality-Aware Task Scheduling and Data Distribution for OpenMP Programs on NUMA Systems and Manycore Processors

    Directory of Open Access Journals (Sweden)

    Ananya Muddukrishna

    2015-01-01

    Full Text Available Performance degradation due to nonuniform data access latencies has worsened on NUMA systems and can now be felt on-chip in manycore processors. Distributing data across NUMA nodes and manycore processor caches is necessary to reduce the impact of nonuniform latencies. However, techniques for distributing data are error-prone and fragile and require low-level architectural knowledge. Existing task scheduling policies favor quick load-balancing at the expense of locality and ignore NUMA node/manycore cache access latencies while scheduling. Locality-aware scheduling, in conjunction with or as a replacement for existing scheduling, is necessary to minimize NUMA effects and sustain performance. We present a data distribution and locality-aware scheduling technique for task-based OpenMP programs executing on NUMA systems and manycore processors. Our technique relieves the programmer from thinking of NUMA system/manycore processor architecture details by delegating data distribution to the runtime system and uses task data dependence information to guide the scheduling of OpenMP tasks to reduce data stall times. We demonstrate our technique on a four-socket AMD Opteron machine with eight NUMA nodes and on the TILEPro64 processor and identify that data distribution and locality-aware task scheduling improve performance up to 69% for scientific benchmarks compared to default policies and yet provide an architecture-oblivious approach for programmers.

  14. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  15. Using Integer Programming for Airport Service Planning in Staff Scheduling

    Directory of Open Access Journals (Sweden)

    W.H. Ip

    2010-09-01

    Full Text Available Reliability and safety in flight is extremely necessary and that depend on the adoption of proper maintenance system. Therefore, it is essential for aircraft maintenance companies to perform the manpower scheduling efficiently. One of the objectives of this paper is to provide an Integer Programming approach to determine the optimal solutions to aircraft maintenance planning and scheduling and hence the planning and scheduling processes can become more efficient and effective. Another objective is to develop a set of computational schedules for maintenance manpower to cover all scheduled flights. In this paper, a sequential methodology consisting of 3 stages is proposed. They are initial maintenance demand schedule, the maintenance pairing and the maintenance group(s assignment. Since scheduling would split up into different stages, different mathematical techniques have been adopted to cater for their own problem characteristics. Microsoft Excel would be used. Results from the first stage and second stage would be inputted into integer programming model using Microsoft Excel Solver to find the optimal solution. Also, Microsoft Excel VBA is used for devising a scheduling system in order to reduce the manual process and provide a user friendly interface. For the results, all can be obtained optimal solution and the computation time is reasonable and acceptable. Besides, the comparison of the peak time and non-peak time is discussed.

  16. Building Maintenance. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary of Occupational Titles…

  17. Motorcycle Safety Education. A Curriculum Guide.

    Science.gov (United States)

    Ohio State Board of Education, Columbus.

    This curriculum guide was produced to assist instructors of educational programs for novice motorcycle operators, automobile drivers, and all highway users. An introductory section discusses program implementation concerns, such as public relations, legal considerations, scheduling, staff, students, facilities, motorcycles, insurance, financial…

  18. Scheduling and control of programs in the CICADA computer system for TFTR

    International Nuclear Information System (INIS)

    Christianson, G.B.; Sherrick, M.; Stark, W.

    1983-01-01

    The CICADA computer system is a network of super minicomputers for data acquisition, reduction, display and device control on the TFTR experiment. Human interaction with the CICADA system is accomplished by consoles offering color displays with a high degree of operator interaction with the computer system, and by interactive terminals offering a limited degree of operator interaction. The authors describe the software packages and data bases used to control the consoles and provide communication to an application program attached to a console. The console control program in its turn schedules the execution of control programs that furnish operating system interfaces to applications programs executing at a console or terminal (in response to human activation), or upon activation by scheduling tasks. The control programs handle functions such as applications task activation. They discuss the implementation of the control programs in the multi-computer CICADA environment, and describe the control program data bases. In a TFTR shot cycle, applications programs must be scheduled for activation at operator-defined stages, in order to accomplish the arming of hardware devices, acquisition of summary waveform data, and the acquisition and archiving of raw data. The authors describe the software tasks and data bases of the CICADA event system, which accomplishes this scheduling of applications task activation in conjunction with the control programs. Future enhancements planned for the console control, program control, and event systems are outlined

  19. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  20. Solving cyclical nurse scheduling problem using preemptive goal programming

    Science.gov (United States)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  1. Runway Scheduling Using Generalized Dynamic Programming

    Science.gov (United States)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  2. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  3. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  4. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  5. Automatic programming via iterated local search for dynamic job shop scheduling.

    Science.gov (United States)

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  6. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  7. Basic Automotive Mechanics. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a basic automotive mechanics program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary of Occupational…

  8. Basic Gasoline Engine Mechanics. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a basic gasoline engine mechanics program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…

  9. OpenCL programming guide

    CERN Document Server

    Munshi, Aaftab; Mattson, Timothy G; Fung, James; Ginsburg, Dan

    2011-01-01

    Using the new OpenCL (Open Computing Language) standard, you can write applications that access all available programming resources: CPUs, GPUs, and other processors such as DSPs and the Cell/B.E. processor. Already implemented by Apple, AMD, Intel, IBM, NVIDIA, and other leaders, OpenCL has outstanding potential for PCs, servers, handheld/embedded devices, high performance computing, and even cloud systems. This is the first comprehensive, authoritative, and practical guide to OpenCL 1.1 specifically for working developers and software architects. Written by five leading OpenCL authorities, OpenCL Programming Guide covers the entire specification. It reviews key use cases, shows how OpenCL can express a wide range of parallel algorithms, and offers complete reference material on both the API and OpenCL C programming language. Through complete case studies and downloadable code examples, the authors show how to write complex parallel programs that decompose workloads across many different devices. They...

  10. Reviewing a Reading Program: Professional Development Module. Facilitator's Guide

    Science.gov (United States)

    Kosanovich, Marcia; Jordan, Georgia; Arndt, Elissa; VanSciver, Mary; Wahl, Michelle; Rissman, Lila

    2008-01-01

    This "Facilitator's Guide" has been prepared for presenters of the Reviewing a Reading Program professional development training. It is one of three pieces comprising a suite of materials on reviewing reading programs: this "Guide", the "Reviewing a Reading Program Participant's Guide" and the "Reviewing a Reading Program" Professional Development…

  11. Evolutionary approaches for scheduling a flexible manufacturing system with automated guided vehicles and robots

    Directory of Open Access Journals (Sweden)

    Ramaraj Natarajan

    2012-08-01

    Full Text Available This paper addresses the scheduling of machines, an Automated Guided Vehicle (AGV and two robots in a Flexible Manufacturing System (FMS formed in three loop layouts, with objectives to minimize the makespan, mean flow time and mean tardiness. The scheduling optimization is carried out using Sheep Flock Heredity Algorithm (SFHA and Artificial Immune System (AIS algorithm. AGV is used for carrying jobs between the Load/Unload station and the machines. The robots are used for loading and unloading the jobs in the machines, and also used for transferring jobs between the machines. The algorithms are applied for test problems taken from the literature and the results obtained using the two algorithms are compared. The results indicate that SFHA performs better than AIS for this problem.

  12. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    Science.gov (United States)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  13. Economic-environmental energy and reserve scheduling of smart distribution systems: A multiobjective mathematical programming approach

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economical scheduling of energy and reserve. • Simultaneous participation of loads in both energy and reserve scheduling. • Aggregate wind generation and demand uncertainties in a stochastic model. • Stochastic scheduling of energy and reserve in a distribution system. • Demand response providers’ participation in energy and reserve scheduling. - Abstract: In this paper a stochastic multi-objective economical/environmental operational scheduling method is proposed to schedule energy and reserve in a smart distribution system with high penetration of wind generation. The proposed multi-objective framework, based on augmented ε-constraint method, is used to minimize the total operational costs and emissions and to generate Pareto-optimal solutions for the energy and reserve scheduling problem. Moreover, fuzzy decision making process is employed to extract one of the Pareto-optimal solutions as the best compromise non-dominated solution. The wind power and demand forecast errors are considered in this approach and the reserve can be furnished by the main grid as well as distributed generators and responsive loads. The consumers participate in both energy and reserve markets using various demand response programs. In order to facilitate small and medium loads participation in demand response programs, a Demand Response Provider (DRP) aggregates offers for load reduction. In order to solve the proposed optimization model, the Benders decomposition technique is used to convert the large scale mixed integer non-linear problem into mixed-integer linear programming and non-linear programming problems. The effectiveness of the proposed scheduling approach is verified on a 41-bus distribution test system over a 24-h period

  14. Civil Engineering Technology Program Guide.

    Science.gov (United States)

    Georgia Univ., Athens. Dept. of Vocational Education.

    This program guide presents civil engineering technology curriculum for technical institutes in Georgia. The general information section contains the following: purpose and objectives; program description, including admissions, typical job titles, and accreditation and certification; and curriculum model, including standard curriculum sequence and…

  15. Quarterly report on program cost and schedule: Second quarter, FY 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report provides a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included is the status of the Nuclear Waste Fund revenues and disbursements. 19 figs

  16. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Qianwang Deng

    2017-01-01

    Full Text Available Flexible job-shop scheduling problem (FJSP is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP characteristics. This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II for multiobjective FJSP (MO-FJSP with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload of all machines. It adopts a two-stage optimization mechanism during the optimizing process. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N, in which a bee evolutionary guiding scheme is presented to exploit the solution space extensively. In the second stage, the NSGA-II algorithm with GEN iteration times is used again to obtain the Pareto-optimal solutions. In order to enhance the searching ability and avoid the premature convergence, an updating mechanism is employed in this stage. More specifically, its population consists of three parts, and each of them changes with the iteration times. What is more, numerical simulations are carried out which are based on some published benchmark instances. Finally, the effectiveness of the proposed BEG-NSGA-II algorithm is shown by comparing the experimental results and the results of some well-known algorithms already existed.

  17. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling.

    Science.gov (United States)

    Deng, Qianwang; Gong, Guiliang; Gong, Xuran; Zhang, Like; Liu, Wei; Ren, Qinghua

    2017-01-01

    Flexible job-shop scheduling problem (FJSP) is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP) characteristics. This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for multiobjective FJSP (MO-FJSP) with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload of all machines. It adopts a two-stage optimization mechanism during the optimizing process. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N , in which a bee evolutionary guiding scheme is presented to exploit the solution space extensively. In the second stage, the NSGA-II algorithm with GEN iteration times is used again to obtain the Pareto-optimal solutions. In order to enhance the searching ability and avoid the premature convergence, an updating mechanism is employed in this stage. More specifically, its population consists of three parts, and each of them changes with the iteration times. What is more, numerical simulations are carried out which are based on some published benchmark instances. Finally, the effectiveness of the proposed BEG-NSGA-II algorithm is shown by comparing the experimental results and the results of some well-known algorithms already existed.

  18. Commercial Foods and Culinary Arts. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for commercial foods and culinary arts. The guide contains the following sections: occupational description;…

  19. A new mathematical programming model for long-term production scheduling considering geological uncertainty

    OpenAIRE

    Gholamnejad, J.; Moosavi, E.

    2012-01-01

    Determination of the optimum production schedules over the life of a mine is a critical mechanism in open pit mine planning procedures. Long-term production scheduling is used to maximize the net present value of the project under technical, financial, and environmental constraints. Mathematical programming models are well suited for optimizing long-term production schedules of open pit mines. There are two approaches to solving long-term production problems: deterministic- and uncertainty- b...

  20. Students' guide to program design

    CERN Document Server

    Robertson, Lesley Anne

    1992-01-01

    Students' Guide to Program Design is a textbook on program design. This textbook approaches program design by using structures programming techniques and pseudocode to develop a solution algorithm. Divided into 10 chapters, the book begins with a basic explanation of structured programming techniques, top-down development, and modular design. This discussion is followed by detailed concepts of the syntax of pseudocode; methods of defining the problem; the application of basic control structures in the development of the solution algorithm; desk checking techniques; hierarchy charts; and module

  1. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  2. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  3. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  4. User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program

    Science.gov (United States)

    Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions

    2012-01-01

    This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...

  5. Fashion Marketing. Florida Vocational Program Guide.

    Science.gov (United States)

    Florida State Univ., Tallahassee. Center for Instructional Development and Services.

    This vocational program guide is intended to assist in the organization, operation, and evaluation of a program in fashion marketing in school districts, area vocational centers, and community colleges. The following topics are covered: program content (job duties of wholesale and retail clothing salespersons and curriculum framework and student…

  6. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    Science.gov (United States)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  7. Master schedule for CY-1978. Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Myers, D.A.; Fix, J.J.

    1977-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. No results are presented in this report. The data collected are available in routine reports issued by the Environmental Evaluations staff

  8. Scheduler-Specific Confidentiality for Multi-Threaded Programs and Its Logic-Based Verification

    NARCIS (Netherlands)

    Huisman, Marieke; Ngo, Minh Tri; Beckert, B.; Damiani, F.; Gurov, D.

    2012-01-01

    Observational determinism has been proposed in the literature as a way to ensure condentiality for multi-threaded programs. Intuitively, a program is observationally deterministic if the behavior of the public variables is deterministic, i.e., independent of the private variables and the scheduling

  9. Quarterly report on program cost and schedule: First quarter FY 1989

    International Nuclear Information System (INIS)

    1989-01-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes performance data through December 1988

  10. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  11. Monte Carlo program for the cold neutron beam guide

    International Nuclear Information System (INIS)

    Yoshiki, H.

    1985-02-01

    A Monte Carlo program for the transport of cold neutrons through beam guides has been developed assuming that the neutrons follow the specular reflections. Cold neutron beam guides are normally used to transport cold neutrons (4 ∼ 10 Angstrom) to experimental equipments such as small angle scattering apparatus, TOF measuring devices, polarized neutron spectrometers, and ultra cold neutron generators, etc. The beam guide is about tens of meters in length and is composed from a meter long guide elements made up from four pieces of Ni coated rectangular optical glass. This report describes mathematics and algorithm employed in the Monte Carlo program together with the display of the results. The source program and input data listings are also attached. (Aoki, K.)

  12. TRU Waste Management Program. Cost/schedule optimization analysis

    International Nuclear Information System (INIS)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions

  13. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Pousinho, H.M.I.; Mendes, V.M.F.

    2010-01-01

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

  14. A user's guide for the program NAMMU

    International Nuclear Information System (INIS)

    Rae, J.; Robinson, P.C.; Wickens, L.M.

    1981-06-01

    The computer program NAMMU was written to model heat and groundwater flow problems arising from underground disposal of high-level radioactive waste. At present the program handles two-dimensional time-dependent flow in permeable rock. A general description of NAMMU and the first attempts at validating the code have already been published. Since then it has begun to be applied to flows in real geological regions and it is clear that some form of user's guide has become necessary. The program will certainly undergo further extensions and modifications so this guide will not necessarily cover all aspects of later versions. The code for NAMMU is built on a very general and flexible library of finite-element subprograms written at Harwell over several years. This flexibility, and the fact that many transport problems can be expressed in substantially the same mathematical form has led already to close relatives of NAMMU being written for other transport problems. A recent example is the program MISCFLO which computes solute transport in a form appropriate to miscible displacement flow in oil reservoirs. The NAMMU user's guide applies equally to such close relatives. (author)

  15. Prioritized schedule for review of industrial safety and occupational health programs

    International Nuclear Information System (INIS)

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC's compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ''The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.''

  16. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  17. Heuristic algorithm for single resource constrained project scheduling problem based on the dynamic programming

    Directory of Open Access Journals (Sweden)

    Stanimirović Ivan

    2009-01-01

    Full Text Available We introduce a heuristic method for the single resource constrained project scheduling problem, based on the dynamic programming solution of the knapsack problem. This method schedules projects with one type of resources, in the non-preemptive case: once started an activity is not interrupted and runs to completion. We compare the implementation of this method with well-known heuristic scheduling method, called Minimum Slack First (known also as Gray-Kidd algorithm, as well as with Microsoft Project.

  18. Gasoline Engine Mechanics. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This vocational program guide is intended to assist in the organization, operation, and evaluation of a program in gasoline engine mechanics in school districts, area vocational centers, and community colleges. The following topics are covered: job duties of small-engine mechanics; program content (curriculum framework and student performance…

  19. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  20. Scheduling double round-robin tournaments with divisional play using constraint programming

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    2017-06-01

    We study a tournament format that extends a traditional double round-robin format with divisional single round-robin tournaments. Elitserien, the top Swedish handball league, uses such a format for its league schedule. We present a constraint programming model that characterizes the general double round-robin plus divisional single round-robin format. This integrated model allows scheduling to be performed in a single step, as opposed to common multistep approaches that decompose scheduling into smaller problems and possibly miss optimal solutions. In addition to general constraints, we introduce Elitserien-specific requirements for its tournament. These general and league-specific constraints allow us to identify implicit and symmetry-breaking properties that reduce the time to solution from hours to seconds. A scalability study of the number of teams shows that our approach is reasonably fast for even larger league sizes. The experimental evaluation of the integrated approach takes considerably less computational effort to schedule Elitserien than does the previous decomposed approach. (C) 2016 Elsevier B.V. All rights reserved

  1. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    Science.gov (United States)

    Alvarado, Michelle; Ntaimo, Lewis

    2018-03-01

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  2. Fractional Programming for Communication Systems—Part II: Uplink Scheduling via Matching

    Science.gov (United States)

    Shen, Kaiming; Yu, Wei

    2018-05-01

    This two-part paper develops novel methodologies for using fractional programming (FP) techniques to design and optimize communication systems. Part I of this paper proposes a new quadratic transform for FP and treats its application for continuous optimization problems. In this Part II of the paper, we study discrete problems, such as those involving user scheduling, which are considerably more difficult to solve. Unlike the continuous problems, discrete or mixed discrete-continuous problems normally cannot be recast as convex problems. In contrast to the common heuristic of relaxing the discrete variables, this work reformulates the original problem in an FP form amenable to distributed combinatorial optimization. The paper illustrates this methodology by tackling the important and challenging problem of uplink coordinated multi-cell user scheduling in wireless cellular systems. Uplink scheduling is more challenging than downlink scheduling, because uplink user scheduling decisions significantly affect the interference pattern in nearby cells. Further, the discrete scheduling variable needs to be optimized jointly with continuous variables such as transmit power levels and beamformers. The main idea of the proposed FP approach is to decouple the interaction among the interfering links, thereby permitting a distributed and joint optimization of the discrete and continuous variables with provable convergence. The paper shows that the well-known weighted minimum mean-square-error (WMMSE) algorithm can also be derived from a particular use of FP; but our proposed FP-based method significantly outperforms WMMSE when discrete user scheduling variables are involved, both in term of run-time efficiency and optimizing results.

  3. Prevalence of the β(S) gene among scheduled castes, scheduled tribes and other backward class groups in Central India.

    Science.gov (United States)

    Shrikhande, Anuradha V; Arjunan, Aishwarya; Agarwal, Amit; Dani, Aarti; Tijare, Jayashri; Gettig, Elizabeth; Krishnamurti, Lakshmanan

    2014-01-01

    Sickle cell disease is an inherited disorder of the blood, and characterized by vasoocclusive crises (VOC), risks for pneumococcal infections and organ toxicities, is associated with morbidity and premature mortality. India, with a population of 1.2 billion individuals, is estimated to be home to over 50.0% of the world's patients with sickle cell disease. The β(S) gene [β6(A3)Glu→Val; HBB: c.20A>T] has the highest prevalence in three socio-economically disadvantaged ethnic categories: the Scheduled Castes (SC), the Scheduled Tribes (ST), and Other Backward Class (OBC) groups in India. The tradition of endogamy practiced by the ethnic groups in India provides the rationale for the screening of individual populations to better understand the distribution of the β(S) gene, guide counseling and awareness programs and aid development of public policy. We undertook a study to describe the prevalence of the β(S) gene in these ethnic groups in the district of Nagpur, Maharashtra in Central India. Through community screening and subsequent targeted screening of high risk individuals, 35,636 individuals were screened, of whom 5466 were found to have sickle cell trait and 1010 were identified with sickle cell disease. Community screening revealed a sickle cell trait prevalence of 13.0% in the SC, 12.0% in the ST and 3.4% in the OBC population. This study describes the prevalence of the β(S) gene within these groups in Central India determined by large scale community screening. This program has uncovered previously undiagnosed cases, provided detailed information to guide population-based disease counseling, prevention and comprehensive care programs.

  4. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    2014-01-01

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  5. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-03-15

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. (author)

  6. User's guide to SERICPAC: A computer program for calculating electric-utility avoided costs rates

    Energy Technology Data Exchange (ETDEWEB)

    Wirtshafter, R.; Abrash, M.; Koved, M.; Feldman, S.

    1982-05-01

    SERICPAC is a computer program developed to calculate average avoided cost rates for decentralized power producers and cogenerators that sell electricity to electric utilities. SERICPAC works in tandem with SERICOST, a program to calculate avoided costs, and determines the appropriate rates for buying and selling of electricity from electric utilities to qualifying facilities (QF) as stipulated under Section 210 of PURA. SERICPAC contains simulation models for eight technologies including wind, hydro, biogas, and cogeneration. The simulations are converted in a diversified utility production which can be either gross production or net production, which accounts for an internal electricity usage by the QF. The program allows for adjustments to the production to be made for scheduled and forced outages. The final output of the model is a technology-specific average annual rate. The report contains a description of the technologies and the simulations as well as complete user's guide to SERICPAC.

  7. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  8. Drunk Driving Public Information Program Strategies and Planning Guide.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  9. 29 CFR 99.235 - Program-specific audits.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Program-specific audits. 99.235 Section 99.235 Labor Office... § 99.235 Program-specific audits. (a) Program-specific audit guide available. In many cases, a program... schedule of prior audit findings consistent with the requirements of § 99.315(b), and a corrective action...

  10. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  11. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M.; Babic, B.; Milosevic, B. [Electrical Engineering Inst. Nikola Tesla, Belgrade (Yugoslavia); Sobajic, D.J. [EPRI, Palo Alto, CA (United States). Power System Control; Pao, Y.H. [Case Western Reserve Univ., Cleveland, OH (United States)]|[AI WARE, Inc., Cleveland, OH (United States)

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  12. 77 FR 33253 - Regulatory Guide 8.33, Quality Management Program

    Science.gov (United States)

    2012-06-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0126] Regulatory Guide 8.33, Quality Management Program... Regulatory Commission (NRC or Commission) is withdrawing Regulatory Guide (RG) 8.33, ``Quality Management... Quality Management Program was deleted from the regulations as part of an overall revision in 2002 of the...

  13. An alternate property tax program requiring a forest management plan and scheduled harvesting

    Science.gov (United States)

    D.F. Dennis; P.E. Sendak

    1991-01-01

    Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...

  14. Career/Vocational Preparation for Students with Disabilities: A Program Improvement Guide.

    Science.gov (United States)

    Stodden, Robert A.

    This program improvement guide is designed to assist district and school level interdisciplinary planning teams to improve career/vocational programs for students with disabilities. Its focus is on the integration of best practices within the educational program continuum to achieve positive student outcomes. The guide includes three sections.…

  15. Advances in mixed-integer programming methods for chemical production scheduling.

    Science.gov (United States)

    Velez, Sara; Maravelias, Christos T

    2014-01-01

    The goal of this paper is to critically review advances in the area of chemical production scheduling over the past three decades and then present two recently proposed solution methods that have led to dramatic computational enhancements. First, we present a general framework and problem classification and discuss modeling and solution methods with an emphasis on mixed-integer programming (MIP) techniques. Second, we present two solution methods: (a) a constraint propagation algorithm that allows us to compute parameters that are then used to tighten MIP scheduling models and (b) a reformulation that introduces new variables, thus leading to effective branching. We also present computational results and an example illustrating how these methods are implemented, as well as the resulting enhancements. We close with a discussion of open research challenges and future research directions.

  16. Guided Synthesis of Control Programs Using UPPAAL

    DEFF Research Database (Denmark)

    Hune, T.; Larsen, Kim Guldstrand; Pettersson, P.

    2000-01-01

    the transitions with extra guards. Applying this technique have made synthesis of control programs feasible for a plant producing as many as 60 batches. In comparison, we could only handle plants producing two batches without using guides. The synthesized control programs have been executed in a physical plant...

  17. Master schedule for CY-1980 Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1979-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is presented. The enviromental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Data are reported on the following topics: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurement; portable instrument surveys; and surveillance of waste disposal sites;

  18. Comparing Mixed & Integer Programming vs. Constraint Programming by solving Job-Shop Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Renata Melo e Silva de Oliveira

    2015-03-01

    Full Text Available Scheduling is a key factor for operations management as well as for business success. From industrial Job-shop Scheduling problems (JSSP, many optimization challenges have emerged since de 1960s when improvements have been continuously required such as bottlenecks allocation, lead-time reductions and reducing response time to requests.  With this in perspective, this work aims to discuss 3 different optimization models for minimizing Makespan. Those 3 models were applied on 17 classical problems of examples JSSP and produced different outputs.  The first model resorts on Mixed and Integer Programming (MIP and it resulted on optimizing 60% of the studied problems. The other models were based on Constraint Programming (CP and approached the problem in two different ways: a model CP1 is a standard IBM algorithm whereof restrictions have an interval structure that fail to solve 53% of the proposed instances, b Model CP-2 approaches the problem with disjunctive constraints and optimized 88% of the instances. In this work, each model is individually analyzed and then compared considering: i Optimization success performance, ii Computational processing time, iii Greatest Resource Utilization and, iv Minimum Work-in-process Inventory. Results demonstrated that CP-2 presented best results on criteria i and ii, but MIP was superior on criteria iii and iv and those findings are discussed at the final section of this work.

  19. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  20. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  1. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  2. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program

  3. NWTS waste package program plan. Volume I. Program strategy, description, and schedule

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  4. Stochastic risk-constrained short-term scheduling of industrial cogeneration systems in the presence of demand response programs

    International Nuclear Information System (INIS)

    Alipour, Manijeh; Mohammadi-Ivatloo, Behnam; Zare, Kazem

    2014-01-01

    Highlights: • Short-term self-scheduling problem of customers with CHP units is conducted. • Power demand and pool prices are forecasted using ARIMA models. • Risk management problem is conducted by implementing CVaR methodology. • The demand response program is implemented in self-scheduling problem of CHP units. • Non-convex feasible operation region in different types of CHP units is modeled. - Abstract: This paper presents a stochastic programming framework for solving the scheduling problem faced by an industrial customer with cogeneration facilities, conventional power production system, and heat only units. The power and heat demands of the customer are supplied considering demand response (DR) programs. In the proposed DR program, the responsive load can vary in different time intervals. In the paper, the heat-power dual dependency characteristic in different types of CHP units is taken into account. In addition, a heat buffer tank, with the ability of heat storage, has been incorporated in the proposed framework. The impact of the market and load uncertainties on the scheduling problem is characterized through a stochastic programming formulation. Autoregressive integrated moving average (ARIMA) technique is used to generate the electricity price and the customer demand scenarios. The daily and weekly seasonalities of demand and market prices are taken into account in the scenario generation procedure. The conditional value-at-risk (CVaR) methodology is implemented in order to limit the risk of expected profit due to market price and load forecast volatilities

  5. Modeling Nurse Scheduling Problem Using 0-1 Goal Programming A Case Study Of Tafo Government Hospital Kumasi-Ghana

    Directory of Open Access Journals (Sweden)

    Wallace Agyei

    2015-03-01

    Full Text Available Abstract The problem of scheduling nurses at the Out-Patient Department OPD at Tafo Government Hospital Kumasi Ghana is presented. Currently the schedules are prepared by head nurse who performs this difficult and time consuming task by hand. Due to the existence of many constraints the resulting schedule usually does not guarantee the fairness of distribution of work. The problem was formulated as 0-1goal programming model with the of objective of evenly balancing the workload among nurses and satisfying their preferences as much as possible while complying with the legal and working regulations.. The developed model was then solved using LINGO14.0 software. The resulting schedules based on 0-1goal programming model balanced the workload in terms of the distribution of shift duties fairness in terms of the number of consecutive night duties and satisfied the preferences of the nurses. This is an improvement over the schedules done manually.

  6. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  7. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    Science.gov (United States)

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  8. A Beginner's Guide to BASIC Programming, Part 2.

    Science.gov (United States)

    Hughes, Elizabeth

    1982-01-01

    Discusses a number of important structures which can be used in programming with BASIC, including loops, subroutines, and arrays. To illustrate these structures, a simple grade-averaging program is presented and explained. Commands introduced in Part 1 of the guide are listed in a table. (JL)

  9. ABCASH plotting program users guide

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1995-01-01

    The Automated Bar Coding of Air Samples at Hanford (ABCASH) system provides an integrated data collection, sample tracking, and data reporting system for radioactive particulate air filter samples. The ABCASH plotting program provides a graphical trend report for ABCASH of the performance of air sample results. This document provides an operational guide for using the program. Based on sample location identifier and date range, a trend chart of the available data is generated. The trend chart shows radiological activity versus time. General indications of directional trend of the concentrations in air over time may be discerned. Comparison limit set point values are also shown as derived from the ABCASH data base

  10. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  11. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  12. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    Science.gov (United States)

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  13. The chaos cookbook a practical programming guide

    CERN Document Server

    Pritchard, Joe

    2014-01-01

    The Chaos Cookbook: A Practical Programming Guide discusses the use of chaos in computer programming. The book is comprised of 11 chapters that tackle various topics relevant to chaos and programming. Chapter 1 reviews the concept of chaos, and Chapter 2 discusses the iterative functions. Chapters 3 and 4 cover differential and Lorenz equations. Chapter 5 talks about strange attractors, while Chapter 6 deals with the fractal link. The book also discusses the Mandelbrot set, and then covers the Julia sets. The other fractal systems and the cellular automata are also explained. The last chapter

  14. Updating Linear Schedules with Lowest Cost: a Linear Programming Model

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Many civil engineering projects involve sets of tasks repeated in a predefined sequence in a number of work areas along a particular route. A useful graphical representation of schedules of such projects is time-distance diagrams that clearly show what process is conducted at a particular point of time and in particular location. With repetitive tasks, the quality of project performance is conditioned by the ability of the planner to optimize workflow by synchronizing the works and resources, which usually means that resources are planned to be continuously utilized. However, construction processes are prone to risks, and a fully synchronized schedule may expire if a disturbance (bad weather, machine failure etc.) affects even one task. In such cases, works need to be rescheduled, and another optimal schedule should be built for the changed circumstances. This typically means that, to meet the fixed completion date, durations of operations have to be reduced. A number of measures are possible to achieve such reduction: working overtime, employing more resources or relocating resources from less to more critical tasks, but they all come at a considerable cost and affect the whole project. The paper investigates the problem of selecting the measures that reduce durations of tasks of a linear project so that the cost of these measures is kept to the minimum and proposes an algorithm that could be applied to find optimal solutions as the need to reschedule arises. Considering that civil engineering projects, such as road building, usually involve less process types than construction projects, the complexity of scheduling problems is lower, and precise optimization algorithms can be applied. Therefore, the authors put forward a linear programming model of the problem and illustrate its principle of operation with an example.

  15. Fashion Merchandising: A Suggested Program Guide. Fashion Industry Series No. 4.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The fashion merchandising guide is the fourth of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The job-preparatory guide is intended to provide youths and adults with intensive preparation for initial entry employment and also with career advancement opportunities within the…

  16. Textile Design: A Suggested Program Guide. Fashion Industry Series No. 3.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The textile design guide is the third of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The job-preparatory guide is conceived to provide youth and adults with intensive preparation for initial entry employment and also with career advancement opportunities within specific…

  17. 75 FR 66411 - Small Entity Compliance Guide: Women-Owned Small Business Program

    Science.gov (United States)

    2010-10-28

    ... SMALL BUSINESS ADMINISTRATION Small Entity Compliance Guide: Women-Owned Small Business Program AGENCY: Small Business Administration. ACTION: Notice: Availability of Compliance Guide. SUMMARY: The Small Business Administration (SBA) is announcing the availability of a compliance guide for the Women...

  18. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  19. Schedules of Provisions of the IAEA Regulations for the Safe Transport of Radioactive Material (2009 Ed.). Safety Guide

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is issued in support of Regulations for the Safe Transport of Radioactive Material (IAEA Safety Standards Series No. TS-R-1, 2009 Edition). It lists the paragraph numbers of the Transport Regulations that are relevant for specified types of consignment, classified according to their UN numbers. It does not provide additional recommendations. The intended users are consignors and consignees, carriers, shippers, regulators, and end users involved in the transport of radioactive material. A person or organization intending to transport a particular type of consignment of radioactive material must meet requirements in all sections of the Transport Regulations. This Safety Guide aids users by providing a listing of the relevant requirements of the Transport Regulations for each type of radioactive material, package or shipment. Once a consignor has classified the radioactive material to be shipped, the appropriate UN number can be assigned and the paragraph numbers of the requirements that apply for the shipment can be found in the corresponding schedule

  20. The role of demand response in single and multi-objective wind-thermal generation scheduling: A stochastic programming

    International Nuclear Information System (INIS)

    Falsafi, Hananeh; Zakariazadeh, Alireza; Jadid, Shahram

    2014-01-01

    This paper focuses on using DR (Demand Response) as a means to provide reserve in order to cover uncertainty in wind power forecasting in SG (Smart Grid) environment. The proposed stochastic model schedules energy and reserves provided by both of generating units and responsive loads in power systems with high penetration of wind power. This model is formulated as a two-stage stochastic programming, where first-stage is associated with electricity market, its rules and constraints and the second-stage is related to actual operation of the power system and its physical limitations in each scenario. The discrete retail customer responses to incentive-based DR programs are aggregated by DRPs (Demand Response Providers) and are submitted as a load change price and amount offer package to ISO (Independent System Operator). Also, price-based DR program behavior and random nature of wind power are modeled by price elasticity concept of the demand and normal probability distribution function, respectively. In the proposed model, DRPs can participate in energy market as well as reserve market and submit their offers to the wholesale electricity market. This approach is implemented on a modified IEEE 30-bus test system over a daily time horizon. The simulation results are analyzed in six different case studies. The cost, emission and multiobjective functions are optimized in both without and with DR cases. The multiobjective generation scheduling model is solved using augmented epsilon constraint method and the best solution can be chosen by Entropy and TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) methods. The results indicate demand side participation in energy and reserve scheduling reduces the total operation costs and emissions. - Highlights: • Simultaneous participation of loads in both energy and reserve scheduling. • Environmental/economical scheduling of energy and reserve. • Using demand response for covering wind generation forecast

  1. Federal Smart Cities and Communities Programs Resource Guide

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Federal Smart Cities and Communities Task Force created the " Federal Smart Cities and Communities Programs Resource Guide " to facilitate collaboration and...

  2. A bi-objective integer programming model for partly-restricted flight departure scheduling.

    Science.gov (United States)

    Zhong, Han; Guan, Wei; Zhang, Wenyi; Jiang, Shixiong; Fan, Lingling

    2018-01-01

    The normal studies on air traffic departure scheduling problem (DSP) mainly deal with an independent airport in which the departure traffic is not affected by surrounded airports, which, however, is not a consistent case. In reality, there still exist cases where several commercial airports are closely located and one of them possesses a higher priority. During the peak hours, the departure activities of the lower-priority airports are usually required to give way to those of higher-priority airport. These giving-way requirements can inflict a set of changes on the modeling of departure scheduling problem with respect to the lower-priority airports. To the best of our knowledge, studies on DSP under this condition are scarce. Accordingly, this paper develops a bi-objective integer programming model to address the flight departure scheduling of the partly-restricted (e.g., lower-priority) one among several adjacent airports. An adapted tabu search algorithm is designed to solve the current problem. It is demonstrated from the case study of Tianjin Binhai International Airport in China that the proposed method can obviously improve the operation efficiency, while still realizing superior equity and regularity among restricted flows.

  3. Control system design guide

    Energy Technology Data Exchange (ETDEWEB)

    Sellers, David; Friedman, Hannah; Haasl, Tudi; Bourassa, Norman; Piette, Mary Ann

    2003-05-01

    The ''Control System Design Guide'' (Design Guide) provides methods and recommendations for the control system design process and control point selection and installation. Control systems are often the most problematic system in a building. A good design process that takes into account maintenance, operation, and commissioning can lead to a smoothly operating and efficient building. To this end, the Design Guide provides a toolbox of templates for improving control system design and specification. HVAC designers are the primary audience for the Design Guide. The control design process it presents will help produce well-designed control systems that achieve efficient and robust operation. The spreadsheet examples for control valve schedules, damper schedules, and points lists can streamline the use of the control system design concepts set forth in the Design Guide by providing convenient starting points from which designers can build. Although each reader brings their own unique questions to the text, the Design Guide contains information that designers, commissioning providers, operators, and owners will find useful.

  4. High engagement, high quality: A guiding framework for developing empirically informed asynchronous e-learning programs for health professional educators.

    Science.gov (United States)

    Sinclair, Peter M; Levett-Jones, Tracey; Morris, Amanda; Carter, Ben; Bennett, Paul N; Kable, Ashley

    2017-03-01

    E-learning involves the transfer of skills and knowledge via technology so that learners can access meaningful and authentic educational materials. While learner engagement is important, in the context of healthcare education, pedagogy must not be sacrificed for edu-tainment style instructional design. Consequently, health professional educators need to be competent in the use of current web-based educational technologies so that learners are able to access relevant and engaging e-learning materials without restriction. The increasing popularity of asynchronous e-learning programs developed for use outside of formal education institutions has made this need more relevant. In these contexts, educators must balance design and functionality to deliver relevant, cost-effective, sustainable, and accessible programs that overcome scheduling and geographic barriers for learners. This paper presents 10 guiding design principles and their application in the development of an e-learning program for general practice nurses focused on behavior change. Consideration of these principles will assist educators to develop high quality, pedagogically sound, engaging, and interactive e-learning resources. © 2017 John Wiley & Sons Australia, Ltd.

  5. A review of scheduling problem and resolution methods in flexible flow shop

    Directory of Open Access Journals (Sweden)

    Tian-Soon Lee

    2019-01-01

    Full Text Available The Flexible flow shop (FFS is defined as a multi-stage flow shops with multiple parallel machines. FFS scheduling problem is a complex combinatorial problem which has been intensively studied in many real world industries. This review paper gives a comprehensive exploration review on the FFS scheduling problem and guides the reader by considering and understanding different environmental assumptions, system constraints and objective functions for future research works. The published papers are classified into two categories. First is the FFS system characteristics and constraints including the problem differences and limitation defined by different studies. Second, the scheduling performances evaluation are elaborated and categorized into time, job and multi related objectives. In addition, the resolution approaches that have been used to solve FFS scheduling problems are discussed. This paper gives a comprehensive guide for the reader with respect to future research work on the FFS scheduling problem.

  6. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  7. CPM scheduling : the Contracting Officers' Guide for risk minimization and claims analysis

    OpenAIRE

    Prather, Craig S.

    1998-01-01

    CIVINS (Civilian Institutions) Thesis document There are several hundred contract management related positions in the Navy's Civil Engineer Corps. Many junior and senior Contracting Officers and their representatives who serve in these positions have little to no experience with approving, monitoring and analyzing contractors' construction schedules. Typically, the contractor submits an initial schedule for approval, however, due to the lack of experience and knowledge, scheduling software...

  8. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  9. Drycleaning and Laundering: A Suggested Program Guide. Fashion Industry Series No. 5.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The drycleaning and laundering guide is the last of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The job-preparatory guide is intended to provide youth and adults with intensive preparation for initial entry employment and also with career advancement opportunities within…

  10. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  12. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  13. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  14. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  15. 2012 Gordon Research Conference on Microbial Stress Response, Schedule and Speaker/Poster Program

    Energy Technology Data Exchange (ETDEWEB)

    Donohue, Timothy J. [Univ. of Wisconsin, Madison, WI (United States)

    2012-07-20

    The Gordon Research Conference on Microbial Stress Response was held at Mount Holyoke College, South Hadley, Massachusetts, July 15-20, 2012. The Conference was well-attended with 180 participants. The 2012 Microbial Stress Responses Gordon Research Conference will provide a forum for the open reporting of recent discoveries on the diverse mechanisms employed by microbes to respond to stress. Approaches range from analysis at the molecular level (how are signals perceived and transmitted to change gene expression or function) to cellular and microbial community responses. Attached is a copy of the formal schedule and speaker program and the poster program.

  16. Development and Implementation of an Ultrasound-Guided Peripheral Intravenous Catheter Program for Emergency Nurses.

    Science.gov (United States)

    Edwards, Courtney; Jones, Jodi

    2018-01-01

    Emergency medical care often necessitates placement of peripheral intravenous (PIV) catheters. When traditional methods for obtaining PIV access are not successful, ultrasound guidance is a rescue technique for peripheral vascular placement that improves the quality of patient care. The aim of this training program was to develop a process where emergency nurses would be competent to perform ultrasound guided PIV to improve the quality of patient care delivered while reducing throughput time. Administrative program development required creating a nursing practice statement, procedure guideline, operational plan, and competency validation. A training program comprising both didactic and hands-on training was developed and provided by emergency medicine physicians with formal ultrasound fellowship training. In determining whether the training program was adequate in preparing the student to place an ultrasound-guided PIV, 92.9% of students "agreed" or "strongly agreed." In having confidence in their ability to obtain an ultrasound guided PIV catheter placement, 35.7% of respondents "agreed" and 64.3% "strongly agreed." In finding it difficult to be successful in achieving ultrasound guided PIV catheter placement, 71.4% of students "strongly disagreed" and 14.3% "disagreed." All students (100%) felt it was a feasible task to train nurses to successfully place ultrasound-guided PIV catheters and 71.4% of students strongly support continuing to provide this training program and competency validation. Establishment of an effective didactic and hands-on training program resulted in emergency department nurses becoming competent in placement of ultrasound guided PIV catheters to provide optimal patient care. Copyright © 2017 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  17. Environment, Safety, and Health (ES&H) self-assessment guide

    Energy Technology Data Exchange (ETDEWEB)

    Reese, R.T.; Golden, N.L.; Romero, J.R.; Yesner, S.

    1997-06-01

    This document has been prepared as a guide for conducting self-assessments of ES&H functional programs and organizational (line) implementation of these programs. This guide is intended for use by individuals and/or teams involved in or familiar with ES&H programs and line operations (e.g., the {open_quotes}self{close_quotes}in self-assessment). Essential elements of the self-assessment process are described including: schedule and priorities, scope and approach, assessment criteria (e.g., performance objectives and measures), information gathering and analysis techniques, and documentation of planning efforts and results. The appendices in this guide include: (1) an assessment prioritization process, (2) generic performance objectives for line implementation and for ES&H functional programs, (3) sources for ES&H assessment information, (4) systemic factors (developed for SNL`s root cause analysis program), (5) Lockheed Martin audit questions for management systems, compliance and validation, and specific areas and concerns, (6) DOE facility representatives checklist, and (7) assessment tools and resources developed at SNL and other DOE/Lockheed Martin sites. This document is a product of the efforts associated with the SNL ES&H Oversight Pilot Project conducted from June 1995 to January 1997. This Pilot was part of the overall initiative by DOE to reduce burdensome agency oversight by placing greater reliance on contractor self-assessment.

  18. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  19. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  20. Variable Neighbourhood Search and Mathematical Programming for Just-in-Time Job-Shop Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Sunxin Wang

    2014-01-01

    Full Text Available This paper presents a combination of variable neighbourhood search and mathematical programming to minimize the sum of earliness and tardiness penalty costs of all operations for just-in-time job-shop scheduling problem (JITJSSP. Unlike classical E/T scheduling problem with each job having its earliness or tardiness penalty cost, each operation in this paper has its earliness and tardiness penalties, which are paid if the operation is completed before or after its due date. Our hybrid algorithm combines (i a variable neighbourhood search procedure to explore the huge feasible solution spaces efficiently by alternating the swap and insertion neighbourhood structures and (ii a mathematical programming model to optimize the completion times of the operations for a given solution in each iteration procedure. Additionally, a threshold accepting mechanism is proposed to diversify the local search of variable neighbourhood search. Computational results on the 72 benchmark instances show that our algorithm can obtain the best known solution for 40 problems, and the best known solutions for 33 problems are updated.

  1. Collection Development for the School Library Media Program: A Beginner's Guide

    Science.gov (United States)

    Kerby, Mona

    2006-01-01

    A valuable resource for new or experienced school librarians, "Collection Development for the School Library Media Program: A Beginner's Guide" is an easy-to-use guide to collection development. It provides practical and relevant information about collection development issues such as: the school users, policies, selection criteria and sources,…

  2. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  3. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  4. A user's guide for the program NAMMU

    International Nuclear Information System (INIS)

    Wickens, L.M.

    1981-09-01

    NAMMU is a computer program developed to model single-phase fluid flow in a porous medium. Heat sources may be included if required. Part 1 of this user guide described the program NAMMU in some detail. Here NAMMU is used to solve a specific example problem. The intention is to illustrate the use of the program, highlighting its flexible nature as well as providing a convenient source of information on how to implement NAMMU. The geology, topography and characteristics of the waste repository used in the example are invented just for this illustration and are not representing any real situation. Also, the pathlines calculated and referred to in this paper are for water particles and will not be the same as pathlines for migrating radionuclides. (author)

  5. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  6. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  7. The art of appropriate evaluation : a guide for highway safety program managers

    Science.gov (United States)

    2008-08-01

    The guide, updated from its original release in 1999, is intended for project managers who will oversee the evaluation of traffic safety programs. It describes the benefits of evaluation and provides an overview of the steps involved. The guide inclu...

  8. The Impact of Specialized Telephonic Guides on Employee Engagement in Corporate Well-Being Programs.

    Science.gov (United States)

    Boerger, Nicholas L; Barleen, Nathan A; Marzec, Mary L; Moloney, Daniel P; Dobro, Jeff

    2018-02-01

    Employer-sponsored well-being programs have been growing in popularity as a means to control rising health care costs and increase workplace productivity. Engagement by employees is necessary for these programs to achieve their desired effects. Extrinsic motivators in the form of incentives and surcharges are commonly introduced by employer program sponsors to promote meaningful engagement. Although these may be successful in achieving a degree of engagement, individuals benefit by being intrinsically motivated as they modify behaviors and improve short- and long-term well-being. Telephonic guides equipped with motivational interviewing and other behavioral strategies to improve engagement may bridge the gap between extrinsic and intrinsic motivation. The objectives of this study are to determine characteristics associated with employee utilization of these guides when offered and to compare subsequent program engagement rates between utilizers to a propensity score matched group of employees who were not offered the service. The data were retrieved from a well-being program provider's database. The study examined 166,258 employees across 35 employers. It found utilizers were older, proportionally more female, in the manufacturing industry, incented to use the guide service, offered a larger incentive for program participation, had healthier self-reported behaviors, and had a higher perception of their employer's focus on well-being. The study found that guide utilizers were significantly more likely to engage in telephonic coaching, digital coaching, and activity tracking up to 6 months. The study's findings suggest telephonic guides using a range of behavioral techniques are an effective strategy to drive well-being program engagement.

  9. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  10. Fixed Schedules Can Support 21st-Century Skills

    Science.gov (United States)

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  11. Discussion of Regulatory Guide 7.10, emphasizing the graded approach for establishing QA programs

    International Nuclear Information System (INIS)

    Gordon, L.; Lake, W.H.

    1983-01-01

    To assist applicants in establishing an acceptable QA program to meet the programmatic elements of Appendix E to 10 CFR Part 71, Regulatory Guide 7.10 was developed. Regulatory Guide 7.10 is organized in three self-contained ANNEXES. Guidance applicable to designer/fabricators, to users, and users of radiographic devices are in separate annexes. QA programs for packaging to transport radioactive material are similar in regard to the various operations a licensee may be involved in. However, the appropriate QA/QC effort to verify the program elements may vary significantly. This is referred to as the graded approach. Appendix A in the guide addresses the graded approach

  12. Quarterly report on program cost and schedule: Third quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes performance data through June 1988. In December 1987, Congress passed the Nuclear Waste Policy Amendments Act of 1987 which changed the near-term activities of the program. Specifically, this Act required that the tuff site in Nevada be characterized for the first repository and that site-specific activities at the other two first repository sites (the salt site in Texas and the basalt site in Washington) be terminated within 90 days of enactment. The Act requires the phase-out of all second repository activities designed to evaluate the suitability of crystalline rock as a potential hoist rock for a repository. The new legislation impacts the contents of this report by focusing the first repository program on the activities of the tuff project and phasing-out the activities for the salt, basalt and second repository projects

  13. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  14. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  15. COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS

    Directory of Open Access Journals (Sweden)

    I Gede Agus Widyadana

    2001-01-01

    Full Text Available The decisions to choose appropriate tools for solving industrial problems are not just tools that achieve optimal solution only but it should consider computation time too. One of industrial problems that still difficult to achieve both criteria is scheduling problem. This paper discuss comparison between mixed integer programming which result optimal solution and heuristic method to solve job shop scheduling problem with separable sequence-dependent setup. The problems are generated and the result shows that the heuristic methods still cannot satisfy optimal solution.

  16. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  17. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  18. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  19. Guidelines for successful self-scheduling on nursing units.

    Science.gov (United States)

    Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A

    2012-09-01

    Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed.

  20. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    Science.gov (United States)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  1. Guide for Conducting Benefit-Cost Evaluation of Realized Impacts of Public R&D Programs

    Energy Technology Data Exchange (ETDEWEB)

    Ruegg, Rosalie [TIA Consulting, Inc., Emerald Isle, NC (United States); Jordan, Gretchen B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2011-08-01

    This document provides guidance for evaluators who conduct impact assessments to determine the “realized” economic benefits and costs, energy, environmental benefits, and other impacts of the Office of Energy Efficiency and Renewable Energy’s (EERE) R&D programs. The focus of this Guide is on realized outcomes or impacts of R&D programs actually experienced by American citizens, industry, and others. Retrospective evaluations may be contrasted to prospective evaluations that reflect expected or potential outcomes only if assumptions hold. The retrospective approach described in this Guide is based on realized results only and the extent they can be attributed to the efforts of an R&D program. While it has been prepared specifically to guide retrospective benefit-cost analysis of EERE R&D Programs, this report may be used for similar analysis of other public R&D organizations.

  2. Guide to safe work : fatigue management : an employer's guide to designing and implementing a fatigue management program. 2 ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    The impacts of fatigue on workplace safety are now commonly recognized. Many employers now wish to include fatigue management as part of their overall health and safety programs. This guide to fatigue management was written to help companies in the petroleum industry design and implement effective fatigue management programs that reduce incidents and injuries among employees. The guide provided information about workplace fatigue and discussed fatigue management issues and strategies. It was suggested that workplace culture can play a significant role in managing fatigue by allowing fatigue factors to be quickly recognized and managed. Employers who wish to build fatigue management programs should involve all levels of employees, and should consider all workplace practices and procedures. Consideration must also be given to the development of employee competency in managing fatigue. The guide included step-by-step recommendations for implementing a fatigue management program. It was concluded that the benefits of fatigue management include reduced worker absence and turnover, as well as avoiding the costs of safety incidents. 1 tab., 1 fig.

  3. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  4. Guide to energy R and D programs for universities and other research groups

    International Nuclear Information System (INIS)

    1984-06-01

    The purpose of this guide to provide researchers in universities and other research institutions with summary-level information on the various research and development programs supported by the Department. Collectively, DOE programs support a wide range of research activities - from studies on the fundamental nature of matter and energy to exploratory and advanced research on the development of new technical approaches leading to new energy technologies. The guide summarizes, in one source, basic information on DOE's energy research and development and related programs, interests and needs. It supplies information on current Federal and DOE grant and contract policies and procedures and lists the names of DOE staff, by program area, from whom additional information may be obtained

  5. Career Exploration in the Fashion Industry: A Suggested Program Guide. Fashion Industry Series No. 1.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The career exploration guide is the first of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The series is intended to provide an information source for establishing, expanding, or evaluating secondary and adult vocational instructional programs related to the broad field of…

  6. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  7. Talking about Mental Illness: A Guide for Developing an Awareness Program for Youth. Community Guide.

    Science.gov (United States)

    2001

    This guide contains all of the information, support and tools that community members need to implement "Talking About Mental Illness" in their community--an awareness program proven to be effective in bringing about positive change in young people's knowledge about mental illness, and in reducing stigma that surrounds mental illness. The…

  8. Guide to Improving Parenting Education in Even Start Family Literacy Programs.

    Science.gov (United States)

    Powell, Douglas R.; D'Angelo, Diane

    This guide provides a framework and suggestions for strengthening the quality and impact of parenting education services in Even Start. It is aimed at Even Start state coordinators and local program administrators responsible for supporting and monitoring the quality of parenting education services in Even Start, and at local program staff…

  9. Career Preparation Program Curriculum Guide for: Hospitality/Tourism Industry (Tourist Services).

    Science.gov (United States)

    British Columbia Dept. of Education, Victoria. Curriculum Development Branch.

    This career preparation curriculum outline for the hospitality/tourism industry is intended to provide secondary and postsecondary learning outcomes for completion of program requirements. The guide is organized into four sections. Section one presents an overview of the program, of the philosophy of career education, and of the organization and…

  10. 78 FR 35642 - Certain TV Programs, Literary Works for TV Production and Episode Guides Pertaining to Same...

    Science.gov (United States)

    2013-06-13

    ... INTERNATIONAL TRADE COMMISSION [Docket No 2959] Certain TV Programs, Literary Works for TV... Certain TV Programs, Literary Works for TV Production and Episode Guides Pertaining to Same, DN 2959; the... importation of certain TV programs, literary works for TV production and episode guides pertaining to same...

  11. Best Practices for HPSB Guiding Principles Implementation in Existing DOE Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Jordan W.

    2014-05-06

    The intent of this paper is to document an approach to screening existing buildings at DOE sites for High-Performance and Sustainable Buildings (HPSB) Guiding Principles (GPs) potential, developing policies and programs to address a majority of the HPSB GPs, and how to prioritize buildings with the greatest potential. This paper will also include example strategies for HPSB inventory and projection schedules and best practices on approaching and interpreting select criteria that have been troublesome to sites.

  12. Waste treatability guidance program. User's guide. Revision 0

    International Nuclear Information System (INIS)

    Toth, C.

    1995-01-01

    DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatability groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User's Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan

  13. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  14. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    Science.gov (United States)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  15. Dynamic Vehicle Scheduling for Working Service Network with Dual Demands

    Directory of Open Access Journals (Sweden)

    Bing Li

    2017-01-01

    Full Text Available This study aims to develop some models to aid in making decisions on the combined fleet size and vehicle assignment in working service network where the demands include two types (minimum demands and maximum demands, and vehicles themselves can act like a facility to provide services when they are stationary at one location. This type of problem is named as the dynamic working vehicle scheduling with dual demands (DWVS-DD and formulated as a mixed integer programming (MIP. Instead of a large integer program, the problem is decomposed into small local problems that are guided by preset control parameters. The approach for preset control parameters is given. By introducing them into the MIP formulation, the model is reformulated as a piecewise form. Further, a piecewise method by updating preset control parameters is proposed for solving the reformulated model. Numerical experiments show that the proposed method produces better solution within reasonable computing time.

  16. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    Science.gov (United States)

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  17. Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing

    Directory of Open Access Journals (Sweden)

    H Kazemipoor

    2012-04-01

    Full Text Available A multi-skilled project scheduling problem (MSPSP has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes the MSPSP becomes a special type of a multi-mode resource-constrained project scheduling problem (MM-RCPSP with a huge number of modes. Given the importance of this issue, in this paper, a mixed integer linear programming for the MSPSP is presented. Due to the complexity of the problem, a meta-heuristic algorithm is proposed in order to find near optimal solutions. To validate performance of the algorithm, results are compared against exact solutions solved by the LINGO solver. The results are promising and show that optimal or near-optimal solutions are derived for small instances and good solutions for larger instances in reasonable time.

  18. Elements of programming interviews the insider's guide

    CERN Document Server

    Aziz, Adnan; Prakash, Amit

    2015-01-01

    This is a larger-format version of Elements of Programming Interviews. The language is C++. Specifically, the font size is larger, and the page size is 7"x10" (the regular format uses 6"x9"). The content is identical. Have you ever... Wanted to work at an exciting futuristic company? Struggled with an interview problem that could have been solved in 15 minutes? Wished you could study real-world computing problems? If so, you need to read Elements of Programming Interviews (EPI). EPI is your comprehensive guide to interviewing for software development roles. The core of EPI is a collection of over 250 problems with detailed solutions. The problems are representative of interview questions asked at leading software companies. The problems are illustrated with 200 figures, 300 tested programs, and 150 additional variants. The book begins with a summary of the nontechnical aspects of interviewing, such as strategies for a great interview, common mistakes, perspectives from the other side of the table,...

  19. Finding Funding: A Guide to Federal Sources for Youth Programs. Finding Funding Series

    Science.gov (United States)

    Dobbins-Harper, Dionne; Bhat, Soumya

    2007-01-01

    This publication is part of a series of tools and resources on financing and sustaining youth programming. These tools and resources are intended to help policymakers, program developers, and community leaders develop innovative strategies for implementing, financing, and sustaining effective programs and policies. This guide outlines strategies…

  20. Evidence in promoting positive parenting through the Program-Guide to Develop Emotional Competences

    Directory of Open Access Journals (Sweden)

    Raquel-Amaya Martínez-González

    2016-07-01

    Full Text Available This study aims at providing evidence of the effectiveness of the Program-Guide to Develop Emotional Competences in promoting positive parenting. Contextual, institutional, methodological and professional issues were taken into account to develop a social innovation experience to support parenting as a preventive measure to family conflicts. The study describes both the contents of the Program-Guide and the methodological and evaluation issues that trained professionals need to consider when delivering the Program-Guide to families in natural contexts. Information was gathered and analyzed from 259 parents with children of ages 1-18 who participated in 26 parent training groups. A pre- and post-test design showed that after finishing the sessions parents perceived themselves more competent as parents according to the five dimensions of parenting competences considered: (1 emotional self-regulation abilities; (2 self-esteem and assertiveness; (3 communication strategies; (4 strategies to solve conflicts and to negotiate; and (5 strategies to establish coherent norms, limits and consequences to promote positive discipline. The study presents a discussion on these results from evidence-based parenting programs, as well as some strengths and limitations of the study, together with some suggestions for further research.

  1. A user's guide to the Flexible Spacecraft Dynamics and Control Program

    Science.gov (United States)

    Fedor, J. V.

    1984-01-01

    A guide to the use of the Flexible Spacecraft Dynamics Program (FSD) is presented covering input requirements, control words, orbit generation, spacecraft description and simulation options, and output definition. The program can be used in dynamics and control analysis as well as in orbit support of deployment and control of spacecraft. The program is applicable to inertially oriented spinning, Earth oriented or gravity gradient stabilized spacecraft. Internal and external environmental effects can be simulated.

  2. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  3. Apparel Design and Production: A Suggested Program Guide. Fashion Industry Series No. 2.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The apparel design and production guide is the second of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. Designed to provide youths and adults with intensive preparation for initial entry employment and also with career advancement opportunities within specific categories of jobs,…

  4. The Planning and Scheduling of HST: Improvements and Enhancements since Launch

    Science.gov (United States)

    Taylor, D. K.; Chance, D. R.; Jordan, I. J. E.; Patterson, A. P.; Stanley, M.; Taylor, D. C.

    2001-12-01

    The planning and scheduling (P&S) systems used in operating the Hubble Space Telescope (HST) have undergone such substantial and pervasive re-engineering that today they dimly resemble those used when HST was launched. Processes (i.e., software, procedures, networking, etc.) which allow program implementation, the generation of a Long Range Plan (LRP), and the scheduling of science and mission activities have improved drastically in nearly 12 years, resulting in a consistently high observing efficiency, a stable LRP that principal investigators can use, exceptionally clean command loads uplinked to the spacecraft, and the capability of a very fast response time due to onboard anomalies or targets of opportunity. In this presentation we describe many of the systems which comprise the P&S ("front-end") system for HST, how and why they were improved, and what benefits have been realized by either the HST user community or the STScI staff. The systems include the Guide Star System, the Remote Proposal Submission System - 2 (RPS2), Artificial Intelligence (AI) planning tools such as Spike, and the science and mission scheduling software. We also describe how using modern software languages such as Python and better development practices allow STScI staff to do more with HST (e.g., to handle much more science data when ACS is installed) without increasing the cost to HST operations.

  5. Components installation. Scheduling techniques applied at Framatome for the French nuclear program

    International Nuclear Information System (INIS)

    Cremese, G.

    1982-09-01

    The first scheduling objective is a timely delivery of heavy components manufactured by FRAMATOME factories: reactor vessel, steam generators and pressurizer. The second scheduling function is the preparation and updating of overall and detailed schedules for the coordination and follow-up of: design activities, progress at equipment suppliers, construction and erection activities of sub-contractors, test and start-up tasks by FRAMATOME and customer teams, and maintenance operations by FRAMATOME teams. I shall first describe the schedules for the contract first unit then show how the following units of the contract are scheduled in their turn

  6. Data location-aware job scheduling in the grid. Application to the GridWay metascheduler

    International Nuclear Information System (INIS)

    Delgado Peris, Antonio; Hernandez, Jose; Huedo, Eduardo; Llorente, Ignacio M

    2010-01-01

    Grid infrastructures constitute nowadays the core of the computing facilities of the biggest LHC experiments. These experiments produce and manage petabytes of data per year and run thousands of computing jobs every day to process that data. It is the duty of metaschedulers to allocate the tasks to the most appropriate resources at the proper time. Our work reviews the policies that have been proposed for the scheduling of grid jobs in the context of very data-intensive applications. We indicate some of the practical problems that such models will face and describe what we consider essential characteristics of an optimum scheduling system: aim to minimise not only job turnaround time but also data replication, flexibility to support different virtual organisation requirements and capability to coordinate the tasks of data placement and job allocation while keeping their execution decoupled. These ideas have guided the development of an enhanced prototype for GridWay, a general purpose metascheduler, part of the Globus Toolkit and member of the EGEE's RESPECT program. Current GridWay's scheduling algorithm is unaware of data location. Our prototype makes it possible for job requests to set data needs not only as absolute requirements but also as functions for resource ranking. As our tests show, this makes it more flexible than currently used resource brokers to implement different data-aware scheduling algorithms.

  7. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  8. Guide for dosimetry for sterile insect release programs. 2. ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This guide outlines dosimetric procedures to be followed for the radiation sterilization of live insects for use in pest management programs. The primary use of irradiated, reproductively sterile insects is in the Sterile Insect Technique, where large numbers of sterile insects are released into the field to mate with and thus control pest populations of the same species. A secondary use of sterile insects is as benign hosts for rearing insect parasitoids. The procedures outlined in this guide will help ensure that insects processed with ionizing radiation from gamma, electron, or X-ray sources receive absorbed doses within a predetermined range. Information on effective dose ranges for specific applications of insect sterilization, or on methodology for determining effective dose ranges, is not within the scope of this guide. Note: Dosimetry is only one component of a total quality control program to ensure that irradiated insects are adequately sterilized and sufficiently competitive or otherwise suitable for their intended purpose. This guide covers dosimetry in the irradiation of insects for these types of irradiators: self-contained dry-storage 137 Cs or 60 Co irradiators, large-scale gamma irradiators, and electron accelerators. Additional, detailed information on dosimetric procedures to be followed in installation qualification, operational qualification, performance qualification, and routine product processing can be found in ISO/ASTM Practices 51608 (X-ray [bremsstrahlung] facilities), 51649 (electron beam facilities), 51702 (large-scale gamma facilities), and ASTM Practice E 2116 (self-contained dry-storage gamma facilities). The absorbed dose for insect sterilization is typically within the range of 20 Gy to 600 Gy

  9. Ecotourism, sustainable development, and conservation education: Development of a tour guide training program in Tortuguero, Costa Rica

    Science.gov (United States)

    Jacobson, Susan K.; Robles, Rafael

    1992-11-01

    A tour guide training program was developed for rural communities near Costa Rica's Tortuguero National Park to respond to the impacts of the 24-fold increase in park visitation in the past decade, to involve local communities in resource management, and to provide regional environmental education. The development of the training course involved a survey of scientists and park managers to ascertain resource management needs, priorities for information to be disseminated, and impacts of tourism on the resource base. Current and potential tour guides were surveyed to identify their information needs, solicit their input in the training program, and to determine their knowledge and skills. Written questionnaires were developed and given to 400 tourists to determine their activities and environmental information needs, and hotel owners were censused to examine the economic feasibility of a local guide program. A pilot training course and guide program involving 12 Tortuguero residents demonstrated that a tour guide program: (1) helped mitigate negative tourism impacts on Tortuguero National Park's natural resources, particularly by regulating tourists on the park's 35-km beach used for nesting by endangered sea turtles; (2) provided environmental education to an important segment of the local community not traditionally reached through school or government development projects; (3) provided environmental information to tourists, thus enhancing their visit; and (4) provided local economic benefits through lucrative part-time employment, thereby allowing local people to participate more fully in the tourism system. An extended training course is being planned to provide further environmental education programming and to increase year-round employment opportunities for the tour guides.

  10. Object-oriented design and programming with C++ your hands-on guide to C++ programming, with special emphasis on design, testing, and reuse

    CERN Document Server

    Leach, Ronald

    2014-01-01

    Object-Oriented Design and Programming with C++: Your Hands-On Guide to C++ Programming, with Special Emphasis on Design, Testing, and Reuse provides a list of software engineering principles to guide the software development process. This book presents the fundamentals of the C++ language.Organized into two parts encompassing 10 chapters, this book begins with an overview of C++ and describes object-oriented programming and the history of C++. This text then introduces classes, polymorphism, inheritance, and overloading. Other chapters consider the C++ preprocessor and organization of class l

  11. 78 FR 42106 - Certain TV Programs, Literary Works for TV Production and Episode Guides Pertaining to Same...

    Science.gov (United States)

    2013-07-15

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-886] Certain TV Programs, Literary Works for TV Production and Episode Guides Pertaining to Same; Institution of Investigation Pursuant to 19 U... of certain TV programs, literary works for TV production and episode guides pertaining to same by...

  12. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  13. Using Multiple and Logistic Regression to Estimate the Median WillCost and Probability of Cost and Schedule Overrun for Program Managers

    Science.gov (United States)

    2017-03-23

    Logistic Regression to Estimate the Median Will-Cost and Probability of Cost and Schedule Overrun for Program Managers Ryan C. Trudelle, B.S...not the other. We are able to give logistic regression models to program managers that identify several program characteristics for either...considered acceptable. We recommend the use of our logistic models as a tool to manage a portfolio of programs in order to gain potential elusive

  14. Enticing Viewers: Sex and Violence in TV Guide Program Advertisements.

    Science.gov (United States)

    Williams, Gilbert A.

    1989-01-01

    Examines advertisements in TV Guide for the years 1980 to 1985 to determine whether the presence of sex and violence in program advertisements affects audiences' viewing habits. Finds that sex and violence are prevalent in the advertisements but that the effect on the ratings is mixed. (RS)

  15. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  17. Status of US program for disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    Smith, R.I.

    1991-04-01

    In this paper, a brief history of the United States' program for the disposal of spent nuclear fuel (SNF) and the legislative acts that have guided the program are discussed. The current plans and schedules for beginning acceptance of SNF from the nuclear utilities for disposal are described, and some of the development activities supporting the program are discussed. And finally, the viability of the SNF disposal fee presently paid into the Nuclear Waste Fund by the owners/generators of commercial SNF and high-level waste (HLW) is examined. 12 refs., 9 figs

  18. Mechanistic Distinctions between CHK1 and WEE1 Inhibition Guide the Scheduling of Triple Therapy with Gemcitabine.

    Science.gov (United States)

    Koh, Siang-Boon; Wallez, Yann; Dunlop, Charles R; Bernaldo de Quirós Fernández, Sandra; Bapiro, Tashinga E; Richards, Frances M; Jodrell, Duncan I

    2018-06-01

    Combination of cytotoxic therapy with emerging DNA damage response inhibitors (DDRi) has been limited by tolerability issues. However, the goal of most combination trials has been to administer DDRi with standard-of-care doses of chemotherapy. We hypothesized that mechanism-guided treatment scheduling could reduce the incidence of dose-limiting toxicities and enable tolerable multitherapeutic regimens. Integrative analyses of mathematical modeling and single-cell assays distinguished the synergy kinetics of WEE1 inhibitor (WEE1i) from CHEK1 inhibitor (CHK1i) by potency, spatiotemporal perturbation, and mitotic effects when combined with gemcitabine. These divergent properties collectively supported a triple-agent strategy, whereby a pulse of gemcitabine and CHK1i followed by WEE1i durably suppressed tumor cell growth. In xenografts, CHK1i exaggerated replication stress without mitotic CDK hyperactivation, enriching a geminin-positive subpopulation and intratumoral gemcitabine metabolite. Without overt toxicity, addition of WEE1i to low-dose gemcitabine and CHK1i was most effective in tumor control compared with single and double agents. Overall, our work provides quantitative insights into the mechanisms of DDRi chemosensitization, leading to the rational development of a tolerable multitherapeutic regimen. Significance: Multiple lines of mechanistic insight regarding DNA damage response inhibitors rationally guide the preclinical development of a tolerable multitherapeutic regimen. Graphical Abstract: http://cancerres.aacrjournals.org/content/canres/78/11/3054/F1.large.jpg Cancer Res; 78(11); 3054-66. ©2018 AACR . ©2018 American Association for Cancer Research.

  19. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    Science.gov (United States)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  20. Guide to accelerator physics program SYNCH: VAX version 1987.2

    International Nuclear Information System (INIS)

    Parsa, Z.; Courant, E.

    1987-01-01

    This guide is written to accommodate users of Accelerator Physics Data Base BNLDAG::DUAO:[PARSA1]. It describes the contents of the on line Accelerator Physics data base DUAO:[PARSA1.SYNCH]. SYNCH is a computer program used for the design and analysis of synchrotrons, storage rings and beamlines

  1. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  2. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  3. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  4. Performance-Oriented packaging: A guide to identifying, procuring, and using

    International Nuclear Information System (INIS)

    O'Brien, J.H.

    1992-09-01

    This document guides users through the process of correctly identifying, obtaining, and using performance-oriented packaging. Almost all hazardous material shipments can be made in commercially available performance-oriented packaging. To cover the remaining shipments requiring specially designed packaging, a design guide is being developed. The design guide is scheduled to be issued 1 year after this procurement guide

  5. League Constitution and Bylaws for Girls' Interscholastic Programs (Suggested Guide).

    Science.gov (United States)

    Turner, Mary Ann

    This guide was developed to assist with the problems of organization and administration of girls' interscholastic sports programs. Guidelines are presented for the following: (a) a statement of basic principles, (b) a constitution, (c) league bylaws, (d) operating codes, (e) conduct of contests, (f) archery, (g) badminton, (h) basketball, (i)…

  6. Collective Cultural Memory as a TV Guide: “Living” History and Nostalgia on the Digital Television Platform

    Directory of Open Access Journals (Sweden)

    Hagedoorn Berber

    2017-12-01

    Full Text Available Modern audiences engage with representations of the past in a particular way via the medium of television, negotiating a shared understanding of the past. This is evidenced by the increasing popularity of reboots, newly developed history and documentary programming, re-use of archival footage and nostalgia content. This article takes a closer look at television’s abilities to circulate and contextualize the past in the current era of convergence through narrowcasting or niche programming on digital television platforms, specifically via nostalgia programming. Such platforms exemplify the multifaceted way of looking at and gaining access to television programming through a variety of connected platforms and screens in the current multi-platform era. Since the way in which television professionals (producers, schedulers, commissioners, researchers act as moderators in this process needs to be further analysed, the article places an emphasis on how meaningful connections via previously broadcast history and nostalgia programming are also curated, principally through scheduling and production practices for niche programming – key elements in television’s creative process that have received less academic attention. Furthermore, the article discusses to what extent media policy in the Netherlands is attuned to the (re-circulation of previously broadcast content and programming about past events, and reflects on television’s possibilities for “re-screening” references to the past in the contemporary media landscape. The analysis is based on a combination of textual analysis of audio-visual archival content and a production studies approach of interviews with key professionals, to gain insight into the creators’ strategies in relation to nostalgia programming and scheduling. Subsequently, the article demonstrates how national collective memory, as understood by television professionals in the Netherlands, informs the scheduling and

  7. Manufacturing Math Classes: An Instructional Program Guide for Manufacturing Workers.

    Science.gov (United States)

    McBride, Pamela G.; And Others

    This program guide documents a manufacturing job family curriculum that develops competence in generic work force education skills through three courses: Reading Rulers, Charts, and Gauges and Math for Manufacturing Workers I and II. An annotated table of contents lists a brief description of the questions answered in each section. An introduction…

  8. Waste treatability guidance program. User`s guide. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Toth, C.

    1995-12-21

    DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatability groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.

  9. HOROPLAN: computer-assisted nurse scheduling using constraint-based programming.

    Science.gov (United States)

    Darmoni, S J; Fajner, A; Mahé, N; Leforestier, A; Vondracek, M; Stelian, O; Baldenweck, M

    1995-01-01

    Nurse scheduling is a difficult and time consuming task. The schedule has to determine the day to day shift assignments of each nurse for a specified period of time in a way that satisfies the given requirements as much as possible, taking into account the wishes of nurses as closely as possible. This paper presents a constraint-based, artificial intelligence approach by describing a prototype implementation developed with the Charme language and the first results of its use in the Rouen University Hospital. Horoplan implements a non-cyclical constraint-based scheduling, using some heuristics. Four levels of constraints were defined to give a maximum of flexibility: French level (e.g. number of worked hours in a year), hospital level (e.g. specific day-off), department level (e.g. specific shift) and care unit level (e.g. specific pattern for week-ends). Some constraints must always be verified and can not be overruled and some constraints can be overruled at a certain cost. Rescheduling is possible at any time specially in case of an unscheduled absence.

  10. Action dependent heuristic dynamic programming based residential energy scheduling with home energy inter-exchange

    International Nuclear Information System (INIS)

    Xu, Yancai; Liu, Derong; Wei, Qinglai

    2015-01-01

    Highlights: • The algorithm is developed in the two-household energy management environment. • We develop the absent energy penalty cost for the first time. • The algorithm has ability to keep adapting in real-time operations. • Its application can lower total costs and achieve better load balancing. - Abstract: Residential energy scheduling is a hot topic nowadays in the background of energy saving and environmental protection worldwide. To achieve this objective, a new residential energy scheduling algorithm is developed for energy management, based on action dependent heuristic dynamic programming. The algorithm works under the circumstance of residential real-time pricing and two adjacent housing units with energy inter-exchange, which can reduce the overall cost and enhance renewable energy efficiency after long-term operation. It is designed to obtain the optimal control policy to manage the directions and amounts of electricity energy flux. The algorithm’s architecture is mainly constructed based on neural networks, denoting the learned characteristics in the linkage of layers. To get close to real situations, many constraints such as maximum charging/discharging power of batteries are taken into account. The absent energy penalty cost is developed for the first time as a part of the performance index function. When the environment changes, the residential energy scheduling algorithm gains new features and keeps adapting in real-time operations. Simulation results show that the developed algorithm is beneficial to energy conversation

  11. Life Values as an Intrinsic Guide for Cardiopulmonary Rehabilitation Program Engagement: A QUALITATIVE ANALYSIS.

    Science.gov (United States)

    Ellis, Jordan M; Whited, Matthew C; Freeman, John Taylor; Corson, Ansley T; Jameson, John Paul; Greenway, Stacey; Sager, David M; Midgette, Emily P; Varju, Eliza V

    2017-11-08

    Participation in cardiovascular and pulmonary rehabilitation (CVPR) programs can lead to improved functional abilities and improved quality of life, but attendance and adherence to these programs remain suboptimal. Behavioral therapies have emphasized the importance of life value identification as a guide for goal setting and behavior change for both psychological and physical health conditions. Individuals who choose to engage in behaviors that align with their life values are thought to be intrinsically reinforced. The purpose of the following qualitative study was to interview patients enrolled in CVPR about their own life values and motivating factors related to healthy behavior changes. Thirty cardiac or pulmonary patients were recruited from a CVPR program and participated in a semistructured interview about their life values and motivating factors related to program engagement. The data were transcribed and analyzed thematically. Participants identified a wide range of values related to program engagement, and only half of the participants endorsed health as a value. The most frequently endorsed life values included being active, family, and independence. The interviews indicated that, although patients make lifestyle changes in the program to improve their physical health, there are often other values that primarily guide their choice to engage in and maintain lifestyle behaviors. Life values can serve as a powerful guide for individual behavior change. The present study suggests that the piloting of brief values interventions early in CVPR treatment is warranted and has the potential to improve patient outcomes.

  12. Curriculum Guide, English as a Second Language for the Workplace, Worker Education Program.

    Science.gov (United States)

    Northeastern Illinois Univ., Chicago. Chicago Teachers' Center.

    This guide describes a worker-centered, holistic, English-language training program for the textile industry in Illinois, now in its fifth funding cycle. The program, which provides training to approximately 500 workers, requires cooperation among business, labor unions, and educational organizations. A 5-unit curriculum covers work issues, health…

  13. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2018; Medicare Shared Savings Program Requirements; and Medicare Diabetes Prevention Program. Final rule.

    Science.gov (United States)

    2017-11-15

    This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.

  14. Approximate dynamic programming approaches for appointment scheduling with patient preferences.

    Science.gov (United States)

    Li, Xin; Wang, Jin; Fung, Richard Y K

    2018-04-01

    During the appointment booking process in out-patient departments, the level of patient satisfaction can be affected by whether or not their preferences can be met, including the choice of physicians and preferred time slot. In addition, because the appointments are sequential, considering future possible requests is also necessary for a successful appointment system. This paper proposes a Markov decision process model for optimizing the scheduling of sequential appointments with patient preferences. In contrast to existing models, the evaluation of a booking decision in this model focuses on the extent to which preferences are satisfied. Characteristics of the model are analysed to develop a system for formulating booking policies. Based on these characteristics, two types of approximate dynamic programming algorithms are developed to avoid the curse of dimensionality. Experimental results suggest directions for further fine-tuning of the model, as well as improving the efficiency of the two proposed algorithms. Copyright © 2018 Elsevier B.V. All rights reserved.

  15. COATING ALTERNATIVES GUIDE (CAGE) USER'S GUIDE

    Science.gov (United States)

    The guide provides instructions for using the Coating Alternatives GuidE (CAGE) software program, version 1.0. It assumes that the user is familiar with the fundamentals of operating an IBM-compatible personal computer (PC) under the Microsoft disk operating system (MS-DOS). CAGE...

  16. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    Science.gov (United States)

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.

  17. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  18. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  19. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  20. 42 CFR 414.620 - Publication of the ambulance fee schedule.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Publication of the ambulance fee schedule. 414.620... SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...

  1. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    OpenAIRE

    Bożek Andrzej; Wysocki Marian

    2016-01-01

    A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also ...

  2. Using the principles of circadian physiology enhances shift schedule design

    International Nuclear Information System (INIS)

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced

  3. Teacher's Guide for Earthworms.

    Science.gov (United States)

    Bruno, Merle S.; And Others

    This teacher's guide on earthworms includes four major sections: (1) introduction, (2) caring for earthworms in the classroom, (3) classroom activities, and (4) the appendix. The introduction includes information concerning grade level, scheduling, materials, obtaining earthworms, field study, classroom clean-up, and records. Caring for earthworms…

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  6. 2012 Gordon Research Conference and Seminar on Atomic and Molecular Interactions - Formal Schedule and Speaker/Poster Program

    Energy Technology Data Exchange (ETDEWEB)

    Zwier, Timothy S. [Purdue Univ., West Lafayette, IN (United States)

    2012-07-20

    The Gordon Research Conference on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 15-20, 2012. The Conference was well-attended with 121 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 121 attendees, 64 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 64 respondents, 11% were Minorities – 2% Hispanic, 9% Asian and 0% African American. Approximately 20% of the participants at the 2012 meeting were women. The Gordon Research SEMINAR on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 14 - 15, 2012. The Conference was well-attended with 42 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 42 attendees, 20 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 20 respondents, 10% were Minorities – 0% Hispanic, 10% Asian and 0% African American. Approximately 29% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to

  7. User's Guide to Biome Information from the United States International Biological Program (IBP). First Edition.

    Science.gov (United States)

    Hinckley, A. Dexter; Haug, Peter T.

    This publication is a guide to the biome research conducted under the International Biological Program. The guide lists biome researchers by interest and by biome as well as a central list. A site list, map, information sources section reporting abstracts, bibliographies, journals, books, evaluations, and data books are also included. Three…

  8. Standard guide for establishing a quality assurance program for analytical chemistry laboratories within the nuclear industry

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2006-01-01

    1.1 This guide covers the establishment of a quality assurance (QA) program for analytical chemistry laboratories within the nuclear industry. Reference to key elements of ANSI/ISO/ASQC Q9001, Quality Systems, provides guidance to the functional aspects of analytical laboratory operation. When implemented as recommended, the practices presented in this guide will provide a comprehensive QA program for the laboratory. The practices are grouped by functions, which constitute the basic elements of a laboratory QA program. 1.2 The essential, basic elements of a laboratory QA program appear in the following order: Section Organization 5 Quality Assurance Program 6 Training and Qualification 7 Procedures 8 Laboratory Records 9 Control of Records 10 Control of Procurement 11 Control of Measuring Equipment and Materials 12 Control of Measurements 13 Deficiencies and Corrective Actions 14

  9. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    International Nuclear Information System (INIS)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented

  10. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  11. Program prioritization system user requirements document for Gas Cooled Reactor Associates

    International Nuclear Information System (INIS)

    1981-01-01

    Efficient management of the national HTGR program requires the establishment of an information system that will facilitate a more rational allocation of resources and task prioritization consistent with program policies. The system described in this document provides a data analysis mechanism for processing top level summary status and planning information in a rapid, timely and selective manner. Data produced by the system can be used by management to provide a rational basis for prioritizing tasks, evaluating program changes and program planning regarding costs, schedules and overall program development logic. The purpose of this document is to delineate the program prioritization system (PPS) requirements for use as a guide to acquiring and implementing the system

  12. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  13. User's guide to the Sandia Mathematical Program Library at Livermore

    Energy Technology Data Exchange (ETDEWEB)

    Huddleston, R.E.; Jefferson, T.H.

    1976-03-01

    The Sandia Mathematical Program Library is a collection of general-purpose mathematical subroutines which are maintained within Sandia on a quick service basis. This document is intended to be a reference guide for using the library at Sandia Laboratories, Livermore. (auth)

  14. Planning and scheduling for petroleum refineries using mathematical programming

    Directory of Open Access Journals (Sweden)

    Joly M.

    2002-01-01

    Full Text Available The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998 is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG area for maximization of the production of petrochemical-grade propane and product delivery.

  15. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  16. Static Schedulers for Embedded Real-Time Systems

    Science.gov (United States)

    1989-12-01

    Because of the need for having efficient scheduling algorithms in large scale real time systems , software engineers put a lot of effort on developing...provide static schedulers for he Embedded Real Time Systems with single processor using Ada programming language. The independent nonpreemptable...support the Computer Aided Rapid Prototyping for Embedded Real Time Systems so that we determine whether the system, as designed, meets the required

  17. Evaluation of a guided continuous quality improvement program in community pharmacies.

    Science.gov (United States)

    Chinthammit, Chanadda; Rupp, Michael T; Armstrong, Edward P; Modisett, Tara; Snead, Rebecca P; Warholak, Terri L

    2017-01-01

    The importance of creating and sustaining a strong culture of patient safety has been recognized as a critical component of safe medication use. This study aims to assess changes in attitudes toward patient safety culture and frequency of quality-related event (QRE) reporting after guided implementation of a continuous quality improvement (CQI) program in a panel of community pharmacies in the United States (U.S.). Twenty-one community pharmacies volunteered to participate in the project and were randomly assigned to intervention or control groups. Pharmacy staff in the intervention group received guided training to ensure full implementation of a CQI program while those in the control group partially implemented the program. Pharmacy staff in both groups completed retrospective pre-post safety culture questionnaires and reported medication errors and near misses that occurred in their practices. Rasch analysis was applied to assess questionnaire validity and reliability and to confirm if the ordinal level data approximated interval level measures. Paired t-tests and repeated measure analysis of covariance tests were subsequently used to compare observed changes in the attitudes of subjects and frequency of QREs reporting in intervention and control groups. Sixty-nine employees completed the questionnaire, a 43.9% response rate. Improvement in attitudes toward patient safety was statistically significant in the intervention group in six domains: staff, training, and skill ( p  = 0.017); patient counseling ( p  = 0.043); communication about mistakes ( p  continuous improvement ( p  < 0.001); and overall patient safety perceptions ( p  = 0.033). No significant differences were observed in QRE reporting rates between intervention and control groups. However, differences were observed in the types of QREs reported (e.g., incorrect safety cap) and the point in the prescription processing workflow where a QRE was detected (e.g., partner check station, and drug

  18. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  19. Cyclic delivery scheduling to customers with different priorities

    Directory of Open Access Journals (Sweden)

    Katarzyna Zofia Gdowska

    2013-12-01

    Full Text Available Background: In this paper a cyclic delivery scheduling problem for customers with different priorities is presented. Shops, which are provided with deliveries, are occasionally located in places which are crucial for the proper flow of traffic. In such places coordination of deliveries is crucial; therefore it allows to completely eliminate the phenomenon of the simultaneous arrivals of suppliers. Methods: In this paper the cyclic delivery scheduling problem for customers with different priorities was presented. To this theoretical problem a mix integer programming model was developed. Specific approach to the cyclic delivery scheduling problem is inspired by timetabling problem for urban public transport. Results: Mixed integer programming model was employed for solving four cases of cyclic delivery scheduling problem for customers with different priorities. When the value of the synchronization priority assigned to a single customer raised then the total number of synchronizations in the whole network decreased. In order to compare solutions a synchronization rate was utilized. A simple factor was utilized - the proportion of number of synchronizations of deliveries to a given customer to the total number of synchronizations obtained for the whole network. When the value of synchronization priority raised then the value of synchronization rate of this customer improved significantly. Conclusions: The mixed integer programming model for the cyclic delivery scheduling problem for customers with different priorities presented in this paper can be utilized for generating schedules of serving customers located in places where only one delivery can be received and unloaded at one go and where there is no space for other suppliers to wait in a queue. Such a schedule can be very useful for organizing deliveries to small shops united in a franchising network, since they operate in a way that is very similar to the network presented in this paper

  20. Guide to Operating and Maintaining EnergySmart Schools

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-01-01

    Through a commitment to high performance, school districts are discovering that smart energy choices can create lasting benefits for students, communities, and the environment. For example, an energy efficient school district with 4,000 students can save as much as $160,000 a year in energy costs. Over 10 years, those savings can reach $1.6 million, translating into the ability to hire more teachers, purchase more textbooks and computers, or invest in additional high performance facilities. Beyond these bottomline benefits, schools can better foster student health, decrease absenteeism, and serve as centers of community life. The U.S. Department of Energy's EnergySmart Schools Program promotes a 30 percent improvement in existing school energy use. It also encourages the building of new schools that exceed code (ASHRAE 90.11999) by 50 percent or more. The program provides resources like this Guide to Operating and Maintaining EnergySmart Schools to assist school decisionmakers in planning, financing, operating, and maintaining energy efficient, high performance schools. It also offers education and training for building industry professionals. Operations and maintenance refer to all scheduled and unscheduled actions for preventing equipment failure or decline with the goal of increasing efficiency, reliability, and safety. A preventative maintenance program is the organized and planned performance of maintenance activities in order to prevent system or production problems or failures from occurring. In contrast, deferred maintenance or reactive maintenance (also called diagnostic or corrective maintenance) is conducted to address an existing problem. This guide is a primary resource for developing and implementing a districtor schoolwide operations and maintenance (O&M) program that focuses on energy efficiency. The EnergySmart Schools Solutions companion CD contains additional supporting information for design, renovation, and retrofit projects. The objective

  1. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  2. Schedule goals for civilian radioactive waste management - Can we have confidence?

    International Nuclear Information System (INIS)

    Bartlett, John W.

    1992-01-01

    The schedule goals for the Civilian Radioactive Waste Management Program are to begin spent fuel receipt from reactors in 1998 and to begin waste disposal in 2010. Although there are various reasons for these goals, the most important is to set demanding goals and be responsible for achieving them. Meeting these goals requires taking into account an array of facilitators and potential inhibitors that affect schedule confidence. Facilitators include actions to prioritize the program, and make its operations efficient. These include actions to baseline activities, emphasize communications with constituencies, use help from others, and facilitate the licensing process. Inhibitors include problems in monitored storage facilities negotiations, obstruction by the State of Nevada, funding deficiencies, and technical uncertainties at Yucca Mountain. At the present time, the program can, in principle meet its schedule goals. In the near-term, the linchpin of schedule confidence is Congressional action to match the Administration's commitment to progress. (author)

  3. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  4. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  5. Special Education Program Evaluation: A Planning Guide. An Overview. CASE Commissioned Series.

    Science.gov (United States)

    McLaughlin, John A.

    This resource guide is intended to help in planning special education program evaluations. It focuses on: basic evaluation concepts, identification of special education decision makers and their information needs, specific evaluation questions, procedures for gathering relevant information, and evaluation of the evaluation process itself.…

  6. A Review Of Design And Control Of Automated Guided Vehicle Systems

    NARCIS (Netherlands)

    T. Le-Anh (Tuan); M.B.M. de Koster (René)

    2004-01-01

    textabstractThis paper presents a review on design and control of automated guided vehicle systems. We address most key related issues including guide-path design, estimating the number of vehicles, vehicle scheduling, idle-vehicle positioning, battery management, vehicle routing, and conflict

  7. A Guide for Planning Facilities for Occupational Preparation Programs in Metallurgy Technology. Interim Report. Research 28.

    Science.gov (United States)

    German, Carl, Jr.

    The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…

  8. 2012 Gordon Research Conference on Rock Deformation - Formal Schedule and Speaker/Poster Program

    Energy Technology Data Exchange (ETDEWEB)

    Kelemen, Peter [Columbia Univ., New York, NY (United States)

    2012-08-24

    The Gordon Research Conference on ROCK DEFORMATION was held at Proctor Academy Andover, New Hampshire, August 19-24, 2012. The Conference was well-attended with 124 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 124 attendees, 66 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 66 respondents, 8% were Minorities – 2% Hispanic, 6% Asian and 0% African American. Approximately 27% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Feedback processes are vitally important in controlling the rates and mechanisms of rock deformation. Positive feedbacks lead to accelerating rates, and commonly to spatial focusing. Localization and acceleration of creep is often associated with stress and/or strain rate dependent grain size reduction, frictional heating, or viscous shear heating. The presence of melt may help to localize and accelerate deformation, and in turn deformation may help to localize melt transport. Volume changes during retrograde metamorphic reactions may, under some circumstances, lead

  9. Carpentry, Culinary Arts Instructor Guide and Curriculums. Bilingual Vocational Education Program.

    Science.gov (United States)

    Densmore, Roxanne T.

    This guide is intended to assist vocational English as a second language (VESL) instructors in teaching courses in carpentry and the culinary arts to residents of Navajo reservations. The first section outlines the rationale and content of the two training programs as well as the basic VESL objectives that they seek to address. The next section, a…

  10. Model-based schedulability analysis of safety critical hard real-time Java programs

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Kragh-Hansen, Henrik; Olsen, Petur

    2008-01-01

    verifiable by the Uppaal model checker [23]. Schedulability analysis is reduced to a simple reachability question, checking for deadlock freedom. Model-based schedulability analysis has been developed by Amnell et al. [2], but has so far only been applied to high level specifications, not actual...

  11. Harvesting and wood transport planning with SNAP III program (Scheduling and Network Analysis Program in a pine plantation in Southeast Brazil

    Directory of Open Access Journals (Sweden)

    Lopes Eduardo da Silva

    2003-01-01

    Full Text Available The objective of this study was to verify the potential of SNAP III (Scheduling and Network Analysis Program as a support tool for harvesting and wood transport planning in Brazil harvesting subsystem definition and establishment of a compatible route were assessed. Initially, machine operational and production costs were determined in seven subsystems for the study area, and quality indexes, construction and maintenance costs of forest roads were obtained and used as SNAP III program input data. The results showed, that three categories of forest road occurrence were observed in the study area: main, secondary and tertiary which, based on quality index, allowed a medium vehicle speed of about 41, 30 and 24 km/hours and a construction cost of about US$ 5,084.30, US$ 2,275.28 and US$ 1,650.00/km, respectively. The SNAP III program used as a support tool for the planning, was found to have a high potential tool in the harvesting and wood transport planning. The program was capable of defining efficiently, the harvesting subsystem on technical and economical basis, the best wood transport route and the forest road to be used in each period of the horizon planning.

  12. Scheduling Additional Train Unit Services on Rail Transit Lines

    OpenAIRE

    Zhibin Jiang; Yuyan Tan; Özgür Yalçınkaya

    2014-01-01

    This paper deals with the problem of scheduling additional train unit (TU) services in a double parallel rail transit line, and a mixed integer programming (MIP) model is formulated for integration strategies of new trains connected by TUs with the objective of obtaining higher frequencies in some special sections and special time periods due to mass passenger volumes. We took timetable scheduling and TUs scheduling as an integrated optimization model with two objectives: minimizing travel ti...

  13. KASS v.2.2. scheduling software for construction

    Directory of Open Access Journals (Sweden)

    Krzemiński Michał

    2016-01-01

    Full Text Available The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System. KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the file exists Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. Described algorithms a program is using which will stay in the article as well as shown computational examples will remain.

  14. A Guide to Outdoor Education Resources and Programs for the Handicapped. Outdoor Education for the Handicapped.

    Science.gov (United States)

    Kentucky Univ., Lexington.

    The resource guide is designed to assist educators, park resource persons, and parents of disabled children in locating and identifying sources of information for developing, implementing, and evaluating outdoor education programs for all disabled children and youth. The guide has two main parts. The first part contains an annotated bibliography…

  15. Parallel-Machine Scheduling with Time-Dependent and Machine Availability Constraints

    Directory of Open Access Journals (Sweden)

    Cuixia Miao

    2015-01-01

    Full Text Available We consider the parallel-machine scheduling problem in which the machines have availability constraints and the processing time of each job is simple linear increasing function of its starting times. For the makespan minimization problem, which is NP-hard in the strong sense, we discuss the Longest Deteriorating Rate algorithm and List Scheduling algorithm; we also provide a lower bound of any optimal schedule. For the total completion time minimization problem, we analyze the strong NP-hardness, and we present a dynamic programming algorithm and a fully polynomial time approximation scheme for the two-machine problem. Furthermore, we extended the dynamic programming algorithm to the total weighted completion time minimization problem.

  16. A stochastic self-scheduling program for compressed air energy storage (CAES) of renewable energy sources (RESs) based on a demand response mechanism

    International Nuclear Information System (INIS)

    Ghalelou, Afshin Najafi; Fakhri, Alireza Pashaei; Nojavan, Sayyad; Majidi, Majid; Hatami, Hojat

    2016-01-01

    Highlights: • Optimal stochastic energy management of renewable energy sources (RESs) is proposed. • The compressed air energy storage (CAES) besides RESs is used in the presence of DRP. • Determination charge and discharge of CAES in order to reduce the expected operation cost. • Moreover, demand response program (DRP) is proposed to minimize the operation cost. • The uncertainty modeling of input data are considered in the proposed stochastic framework. - Abstract: In this paper, a stochastic self-scheduling of renewable energy sources (RESs) considering compressed air energy storage (CAES) in the presence of a demand response program (DRP) is proposed. RESs include wind turbine (WT) and photovoltaic (PV) system. Other energy sources are thermal units and CAES. The time-of-use (TOU) rate of DRP is considered in this paper. This DRP shifts the percentage of load from the expensive period to the cheap one in order to flatten the load curve and minimize the operation cost, consequently. The proposed objective function includes minimizing the operation costs of thermal unit and CAES, considering technical and physical constraints. The proposed model is formulated as mixed integer linear programming (MILP) and it is been solved using General Algebraic Modeling System (GAMS) optimization package. Furthermore, CAES and DRP are incorporated in the stochastic self-scheduling problem by a decision maker to reduce the expected operation cost. Meanwhile, the uncertainty models of market price, load, wind speed, temperature and irradiance are considered in the formulation. Finally, to assess the effects of DRP and CAES on self-scheduling problem, four case studies are utilized, and significant results were obtained, which indicate the validity of the proposed stochastic program.

  17. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that

  18. German Language and Culture: 9-Year Program Guide to Implementation, Grades 4-5-6

    Science.gov (United States)

    Alberta Education, 2008

    2008-01-01

    This implementation guide is intended to support the Grade 4 to Grade 6 portion of the German Language and Culture Nine-year Program (the program of studies). It was developed primarily for teachers, yet it includes information that may be useful for administrators and other stakeholders in their efforts to plan for and implement the new Chinese…

  19. Punjabi Language and Culture: 9-Year Program Guide to Implementation, Grades 4-5-6

    Science.gov (United States)

    Alberta Education, 2008

    2008-01-01

    This implementation guide is intended to support the Grade 4 to Grade 6 portion of the Punjabi Language and Culture Nine-Year Program (the program of studies.) It was developed primarily for teachers, yet it includes information that may be useful for administrators and other stakeholders in their efforts to plan for and implement the new Punjabi…

  20. To Strengthen Policy Guiding Regionalization of Occupational Programs in New Jersey County Community Colleges. A Report.

    Science.gov (United States)

    Martorana, S. V.; And Others

    In 1985 a project was developed to strengthen policy guiding regionalization of occupational programs in New Jersey county community colleges. The project had three major goals: to establish a policy for the regionalization of selected occupational programs offered by the colleges; to describe ways that programs could be identified for regional…

  1. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  2. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  3. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  4. Magnesium sulphate as an adjuvant to bupivacaine in ultrasound-guided transversus abdominis plane block in patients scheduled for total abdominal hysterectomy under subarachnoid block

    Directory of Open Access Journals (Sweden)

    Shelly Rana

    2016-01-01

    Full Text Available Background and Aims: Transversus abdominis plane (TAP block has proven to be an effective component of multimodal analgesic regimens for a variety of abdominal procedures. Magnesium sulphate (MgSO4 N-methyl-D-aspartate receptor antagonist has the potential to be an ideal adjuvant in TAP block. We studied the efficacy of MgSO4as an adjuvant to bupivacaine in TAP block in patients scheduled for total abdominal hysterectomy (TAH under subarachnoid block (SAB. Methods: Sixty-five women belonging to American Society of Anesthesiologists physical status 1 or 2, aged between 35 and 70 years, scheduled for TAH under SAB were recruited. Patients in Group B (n = 32 received 18 mL 0.25% bupivacaine (45 mg with 2 mL normal saline (NS, whereas those in Group BM (n = 33 received 18 mL 0.25% bupivacaine (45 mg with 1.5 mL (150 mg MgSO4and 0.5 mL NS in the ultrasound (USG-guided TAP block performed on each side after the completion of the surgery under SAB. They were evaluated for pain at 0, 2, 4, 6, 12 and 24 h, time to first rescue analgesic and duration of postoperative analgesia were noted. Results: The post-operative visual analogue scale (VAS scores were lower in Group BM at 4, 6 and 12 h (P < 0.05. Mean duration of analgesia was significantly prolonged in Group BM with lesser requirement of rescue analgesic (P < 0.05 up to 12 h. Conclusion: MgSO4 (150 mg as an adjuvant to bupivacaine in USG-guided TAP block reduces post-operative pain scores, prolongs the duration of analgesia and decreases demands for rescue analgesics.

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  6. RingSys-Scheduler User`s manual. Information terminal for town monitoring; Brukermanual for RingSys-Scheduler. Informasjonsterminal for byovervaaking

    Energy Technology Data Exchange (ETDEWEB)

    Marsteen, L.

    1996-02-01

    This report is a User`s manual. It describes RingSys Scheduler, a computer system for continuous display of time series, public information and static pictures. The computer is connected to a host machine via modem and time series, and public information are automatically updated once an hour. RingSys-Scheduler is PC based. It is developed using Excel`s macro language as well as the asynchronous communication program Dynacomm`s script language. 12 figs.

  7. A Guide to Axial-Flow Turbine Off-Design Computer Program AXOD2

    Science.gov (United States)

    Chen, Shu-Cheng S.

    2014-01-01

    A Users Guide for the axial flow turbine off-design computer program AXOD2 is composed in this paper. This Users Guide is supplementary to the original Users Manual of AXOD. Three notable contributions of AXOD2 to its predecessor AXOD, both in the context of the Guide or in the functionality of the code, are described and discussed in length. These are: 1) a rational representation of the mathematical principles applied, with concise descriptions of the formulas implemented in the actual coding. Their physical implications are addressed; 2) the creation and documentation of an Addendum Listing of input namelist-parameters unique to AXOD2, that differ from or are in addition to the original input-namelists given in the Manual of AXOD. Their usages are discussed; and 3) the institution of proper stoppages of the code execution, encoding termination messaging and error messages of the execution to AXOD2. These measures are to safe-guard the integrity of the code execution, such that a failure mode encountered during a case-study would not plunge the code execution into indefinite loop, or cause a blow-out of the program execution. Details on these are discussed and illustrated in this paper. Moreover, this computer program has since been reconstructed substantially. Standard FORTRAN Langue was instituted, and the code was formatted in Double Precision (REAL*8). As the result, the code is now suited for use in a local Desktop Computer Environment, is perfectly portable to any Operating System, and can be executed by any FORTRAN compiler equivalent to a FORTRAN 9095 compiler. AXOD2 will be available through NASA Glenn Research Center (GRC) Software Repository.

  8. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  9. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  10. Task path planning, scheduling and learning for free-ranging robot systems

    Science.gov (United States)

    Wakefield, G. Steve

    1987-01-01

    The development of robotics applications for space operations is often restricted by the limited movement available to guided robots. Free ranging robots can offer greater flexibility than physically guided robots in these applications. Presented here is an object oriented approach to path planning and task scheduling for free-ranging robots that allows the dynamic determination of paths based on the current environment. The system also provides task learning for repetitive jobs. This approach provides a basis for the design of free-ranging robot systems which are adaptable to various environments and tasks.

  11. Spanish Oral Language Guide: Kindergarten Level. Espanol como Segundo Idioma. Teacher's Guide: Level I.

    Science.gov (United States)

    Corbell, Gloria; And Others

    This teacher's guide to Spanish language at the kindergarten level includes a recommended subject presentation sequence for the Spanish curriculum, a sample schedule, a grouping of students using three stations, and a classroom layout. The grouping would be effective when at least one-third of the children are Spanish-speaking or bilingual. The…

  12. Uplink Packet-Data Scheduling in DS-CDMA Systems

    Science.gov (United States)

    Choi, Young Woo; Kim, Seong-Lyun

    In this letter, we consider the uplink packet scheduling for non-real-time data users in a DS-CDMA system. As an effort to jointly optimize throughput and fairness, we formulate a time-span minimization problem incorporating the time-multiplexing of different simultaneous transmission schemes. Based on simple rules, we propose efficient scheduling algorithms and compare them with the optimal solution obtained by linear programming.

  13. From non-preemptive to preemptive scheduling using synchronization synthesis.

    Science.gov (United States)

    Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten

    2017-01-01

    We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.

  14. Robust Optimization-Based Generation Self-Scheduling under Uncertain Price

    Directory of Open Access Journals (Sweden)

    Xiao Luo

    2011-01-01

    Full Text Available This paper considers generation self-scheduling in electricity markets under uncertain price. Based on the robust optimization (denoted as RO methodology, a new self-scheduling model, which has a complicated max-min optimization structure, is set up. By using optimal dual theory, the proposed model is reformulated to an ordinary quadratic and quadratic cone programming problems in the cases of box and ellipsoidal uncertainty, respectively. IEEE 30-bus system is used to test the new model. Some comparisons with other methods are done, and the sensitivity with respect to the uncertain set is analyzed. Comparing with the existed uncertain self-scheduling approaches, the new method has twofold characteristics. First, it does not need a prediction of distribution of random variables and just requires an estimated value and the uncertain set of power price. Second, the counterpart of RO corresponding to the self-scheduling is a simple quadratic or quadratic cone programming. This indicates that the reformulated problem can be solved by many ordinary optimization algorithms.

  15. Integer programming formulation and variable neighborhood search metaheuristic for the multiproduct pipeline scheduling problem

    Energy Technology Data Exchange (ETDEWEB)

    Souza Filho, Erito M.; Bahiense, Laura; Ferreira Filho, Virgilio J.M. [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Lima, Leonardo [Centro Federal de Educacao Tecnologica Celso Sukow da Fonseca (CEFET-RJ), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Pipeline are known as the most reliable and economical mode of transportation for petroleum and its derivatives, especially when large amounts of products have to be pumped for large distances. In this work we address the short-term schedule of a pipeline system comprising the distribution of several petroleum derivatives from a single oil refinery to several depots, connected to local consumer markets, through a single multi-product pipeline. We propose an integer linear programming formulation and a variable neighborhood search meta-heuristic in order to compare the performances of the exact and heuristic approaches to the problem. Computational tests in C language and MOSEL/XPRESS-MP language are performed over a real Brazilian pipeline system. (author)

  16. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  17. Gemcitabine and cisplatin in a concomitant alternating chemoradiotherapy program for locally advanced head-and-neck cancer: A pharmacology-guided schedule

    International Nuclear Information System (INIS)

    Numico, Gianmauro; Russi, Elvio G.; Vitiello, Raffele; Sorrentino, Raffaele; Colantonio, Ida; Cipolat, Marco; Taglianti, Riccardo Vigna; Pelissero, Antonio; Fea, Elena; Granetto, Cristina; Di Costanzo, Gianna; Gasco, Milena; Garrone, Ornella; Occelli, Marcella; Merlano, Marco

    2006-01-01

    Purpose: Administration of gemcitabine together with cisplatin at cytotoxic doses in a chemoradiotherapy regimen is hampered by a high degree of local toxicity. Using the pharmacologic properties of the drug we designed a modified schedule aimed at reducing toxicity while preserving activity. Methods and Materials: Patients with squamous cell carcinomas of the oral cavity, pharynx and larynx, bulky T4, and/or N2 to N3 were eligible. Gemcitabine was administered at a dose of 800 mg/m 2 on Days 1 and 12 and cisplatin at a dose of 20 mg/m 2 on Days 2 to 5, every 21 days for 3 courses. Radiotherapy, delivered with standard fractionation, was given on Days 8 to 12 and 15 to 19 and was repeated 3 times up to a total dose of ≥60 Gy. Results: A total of 28 patients were selected. Grade 3 to 4 stomatitis was recorded in 25 patients (89%). Thirteen patients (46%) experienced Grade 3 to 4 neutropenia. Febrile neutropenia occurred in 8 patients (29%) and in 2 was complicated by infection and death. The overall complete response rate was 79%. At a median follow up of 71 months, 11 patients had a locoregional relapse (3-year locoregional control, 64%); 6 patients had distant metastases, among whom only 2 were without locoregional recurrence. The 3-year progression-free survival is 39% and 3-year overall survival has been 43%. Conclusion: The schedule modification did not attenuate local toxicity. Moreover, infections and especially pneumonia, were a major problem. The high activity of gemcitabine when combined with radiotherapy would most likely be better exploited in the context of modified radiation schemes

  18. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  19. Programmer's guide to FFE: a fast front-end data-acquisition program

    International Nuclear Information System (INIS)

    Million, D.L.

    1983-05-01

    The Large Coil Test Facility project of the Fusion Energy Division has a data acquisition system which includes a large host computer and several small, peripheral front-end computers. The front-end processors handle details of data acquisition under the control of the host and pass data back to the host for storage. Some of the front ends are known as fast front ends and are required to collect a maximum of 64,000 samples each second. This speed and other hardware constraints resulted in a need for a stand-alone, assembly language task which could be downline loaded from the host system into the fast front ends. FFE (Fast Front End) was written to satisfy this need. It was written in the PDP-11 MACRO-11 assembly language for an LSI-11/23 processor. After the host loads the task into the front end, it controls the data acquisition process with a series of commands and parameters. This Programmer's Guide describes the structure and operation of FFE in detail from a programming point of view. A companion User's guide provides more information on the use of the program from the host system

  20. Combined Noncyclic Scheduling and Advanced Control for Continuous Chemical Processes

    Directory of Open Access Journals (Sweden)

    Damon Petersen

    2017-12-01

    Full Text Available A novel formulation for combined scheduling and control of multi-product, continuous chemical processes is introduced in which nonlinear model predictive control (NMPC and noncyclic continuous-time scheduling are efficiently combined. A decomposition into nonlinear programming (NLP dynamic optimization problems and mixed-integer linear programming (MILP problems, without iterative alternation, allows for computationally light solution. An iterative method is introduced to determine the number of production slots for a noncyclic schedule during a prediction horizon. A filter method is introduced to reduce the number of MILP problems required. The formulation’s closed-loop performance with both process disturbances and updated market conditions is demonstrated through multiple scenarios on a benchmark continuously stirred tank reactor (CSTR application with fluctuations in market demand and price for multiple products. Economic performance surpasses cyclic scheduling in all scenarios presented. Computational performance is sufficiently light to enable online operation in a dual-loop feedback structure.

  1. Scheduling models in farm management : a new approach

    NARCIS (Netherlands)

    Wijngaard, P.J.M.

    1988-01-01

    Three operational planning models to calculate schedules for an arable farm are examined. These models are a linear programming model, a dynamic programming model and a simulation model. They are examined at different levels of aggregation and relaxation in a retrospective way. Also a

  2. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  3. Drafting Lab Management Guide.

    Science.gov (United States)

    Ohio State Univ., Columbus. Instructional Materials Lab.

    This manual was developed to guide drafting instructors and vocational supervisors in sequencing laboratory instruction and controlling the flow of work for a 2-year machine trades training program. The first part of the guide provides information on program management (program description, safety concerns, academic issues, implementation…

  4. Healthcare Scheduling by Data Mining: Literature Review and Future Directions

    Directory of Open Access Journals (Sweden)

    Maria M. Rinder

    2012-01-01

    Full Text Available This article presents a systematic literature review of the application of industrial engineering methods in healthcare scheduling, with a focus on the role of patient behavior in scheduling. Nine articles that used mathematical programming, data mining, genetic algorithms, and local searches for optimum schedules were obtained from an extensive search of literature. These methods are new approaches to solve the problems in healthcare scheduling. Some are adapted from areas such as manufacturing and transportation. Key findings from these studies include reduced time for scheduling, capability of solving more complex problems, and incorporation of more variables and constraints simultaneously than traditional scheduling methods. However, none of these methods modeled no-show and walk-ins patient behavior. Future research should include more variables related to patient and/or environment.

  5. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  6. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  7. Engine Lathe Operator. Instructor's Guide. Part of Single-Tool Skills Program Series. Machine Industries Occupations.

    Science.gov (United States)

    New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.

    Expected to help meet the need for trained operators in metalworking and suitable for use in the adult education programs of school districts, in manpower development and training programs, and in secondary schools, this guide consists of four sections: Introduction, General Job Content, Shop Projects, and Drawings for the Projects. General Job…

  8. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  9. Initial Results With Image-guided Cochlear Implant Programming in Children.

    Science.gov (United States)

    Noble, Jack H; Hedley-Williams, Andrea J; Sunderhaus, Linsey; Dawant, Benoit M; Labadie, Robert F; Camarata, Stephen M; Gifford, René H

    2016-02-01

    Image-guided cochlear implant (CI) programming can improve hearing outcomes for pediatric CI recipients. CIs have been highly successful for children with severe-to-profound hearing loss, offering potential for mainstreamed education and auditory-oral communication. Despite this, a significant number of recipients still experience poor speech understanding, language delay, and, even among the best performers, restoration to normal auditory fidelity is rare. Although significant research efforts have been devoted to improving stimulation strategies, few developments have led to significant hearing improvement over the past two decades. Recently introduced techniques for image-guided CI programming (IGCIP) permit creating patient-customized CI programs by making it possible, for the first time, to estimate the position of implanted CI electrodes relative to the nerves they stimulate using CT images. This approach permits identification of electrodes with high levels of stimulation overlap and to deactivate them from a patient's map. Previous studies have shown that IGCIP can significantly improve hearing outcomes for adults with CIs. The IGCIP technique was tested for 21 ears of 18 pediatric CI recipients. Participants had long-term experience with their CI (5 mo to 13 yr) and ranged in age from 5 to 17 years old. Speech understanding was assessed after approximately 4 weeks of experience with the IGCIP map. Using a two-tailed Wilcoxon signed-rank test, statistically significant improvement (p < 0.05) was observed for word and sentence recognition in quiet and noise, as well as pediatric self-reported quality-of-life (QOL) measures. Our results indicate that image guidance significantly improves hearing and QOL outcomes for pediatric CI recipients.

  10. Car painting process scheduling with harmony search algorithm

    Science.gov (United States)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  11. Real-time scheduling of software tasks

    International Nuclear Information System (INIS)

    Hoff, L.T.

    1995-01-01

    When designing real-time systems, it is often desirable to schedule execution of software tasks based on the occurrence of events. The events may be clock ticks, interrupts from a hardware device, or software signals from other software tasks. If the nature of the events, is well understood, this scheduling is normally a static part of the system design. If the nature of the events is not completely understood, or is expected to change over time, it may be necessary to provide a mechanism for adjusting the scheduling of the software tasks. RHIC front-end computers (FECs) provide such a mechanism. The goals in designing this mechanism were to be as independent as possible of the underlying operating system, to allow for future expansion of the mechanism to handle new types of events, and to allow easy configuration. Some considerations which steered the design were programming paradigm (object oriented vs. procedural), programming language, and whether events are merely interesting moments in time, or whether they intrinsically have data associated with them. The design also needed to address performance and robustness tradeoffs involving shared task contexts, task priorities, and use of interrupt service routine (ISR) contexts vs. task contexts. This paper will explore these considerations and tradeoffs

  12. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    International Nuclear Information System (INIS)

    Gallegos, F.R.

    1999-01-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility

  13. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    Science.gov (United States)

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  14. Madison Public Schools. La Follette Careers Program. Tenth Grade Social Studies Guide.

    Science.gov (United States)

    Morrissey, Jim; Waity, Charles

    A social studies course for a tenth grade career program is outlined in this curriculum and teaching guide. A calendar plots the time sequence for the nine units which cover prehistory to the present. The format of each unit is in three sections. The interrelated concepts, behavior goals, and teaching methods and learning activities are presented,…

  15. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  16. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  17. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  18. A Review Of Design And Control Of Automated Guided Vehicle Systems

    OpenAIRE

    Le-Anh, Tuan; Koster, René

    2004-01-01

    textabstractThis paper presents a review on design and control of automated guided vehicle systems. We address most key related issues including guide-path design, estimating the number of vehicles, vehicle scheduling, idle-vehicle positioning, battery management, vehicle routing, and conflict resolution. We discuss and classify important models and results from key publications in literature on automated guided vehicle systems, including often-neglected areas, such as idle-vehicle positionin...

  19. A user's guide to the programs ITRAP-A, ITRAP-B, ITRAP-S and ITRAP-L

    International Nuclear Information System (INIS)

    Manley, A.J.

    1979-03-01

    The four programs ITRAP-A, ITRAP-B, ITRAP-S and ITRAP-L are designed to calculate parameters required for assessing the performance of iodine trapping plant installed in the ventilation systems of enclosures in which radioactive materials are handled. This guide sets out the input to and output from these programs for plant managers and gives sufficient program details to enable the users to assess the accuracy of the methods used. (author)

  20. Optimal OFDMA Downlink Scheduling Under a Control Signaling Cost Constraint

    OpenAIRE

    Larsson, Erik G.

    2010-01-01

    This paper proposes a new algorithm for downlink scheduling in OFDMA systems. The method maximizes the throughput, taking into account the amount of signaling needed to transmit scheduling maps to the users. A combinatorial problem is formulated and solved via a dynamic programming approach reminiscent of the Viterbi algorithm. The total computational complexity of the algorithm is upper boundedby O(K^4N) where K is the number of users that are being considered for scheduling in a frame and N...

  1. ZBASE User's Guide Version 1.1 an Impedance Data Base Program

    CERN Document Server

    Brüning, Oliver Sim

    1996-01-01

    The development of an impedance data base program was motivated by the changing impedance budgets in the LEP and LHC machines and the resulting need to recalculate the instability thresholds for different parameters. For LEP, the changes are implied by the LEP-II upgrade and for the LHC, the impedance data for most items is still being calculated and continues to change as the geometries of the impedance components converge to a final design. The development of the {\\bf ZBASE} program was guided by four goals. First, the data base program should collect the impedance information in a central place and in a standard format which allows easy access. Second, it should include information required for estimating the impact of the impedance on the beam dynamics. Third, the program should provide a user friendly graphical interface and fourth, it should provide an interface to the programs that are used for calculating the impedance data. Collecting not only the impedance data but also the input files for the progr...

  2. A New Evolutionary Algorithm Based on Bacterial Evolution and Its Application for Scheduling A Flexible Manufacturing System

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2012-01-01

    Full Text Available A new evolutionary computation algorithm, Superbug algorithm, which simulates evolution of bacteria in a culture, is proposed. The algorithm is developed for solving large scale optimization problems such as scheduling, transportation and assignment problems. In this work, the algorithm optimizes machine schedules in a Flexible Manufacturing System (FMS by minimizing makespan. The FMS comprises of four machines and two identical Automated Guided Vehicles (AGVs. AGVs are used for carrying jobs between the Load/Unload (L/U station and the machines. Experimental results indicate the efficiency of the proposed algorithm in its optimization performance in scheduling is noticeably superior to other evolutionary algorithms when compared to the best results reported in the literature for FMS Scheduling.

  3. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    Directory of Open Access Journals (Sweden)

    Bożek Andrzej

    2016-03-01

    Full Text Available A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also been implemented, i.e., dispatching rules for the completely reactive scheduling and a multi-agent system for the predictivereactive scheduling. In these implementations three distinct models of the problem have been used, based on: graph representation, optimal constraint satisfaction, and Petri net formalism. Each of these solutions has been verified in computational experiments. The results are compared and some findings about advantages, disadvantages, and suggestions on using the solutions are formulated.

  4. Physician Fee Schedule National Payment Amount File

    Data.gov (United States)

    U.S. Department of Health & Human Services — The significant size of the Physician Fee Schedule Payment Amount File-National requires that database programs (e.g., Access, dBase, FoxPro, etc.) be used to read...

  5. Using Runtime Analysis to Guide Model Checking of Java Programs

    Science.gov (United States)

    Havelund, Klaus; Norvig, Peter (Technical Monitor)

    2001-01-01

    This paper describes how two runtime analysis algorithms, an existing data race detection algorithm and a new deadlock detection algorithm, have been implemented to analyze Java programs. Runtime analysis is based on the idea of executing the program once. and observing the generated run to extract various kinds of information. This information can then be used to predict whether other different runs may violate some properties of interest, in addition of course to demonstrate whether the generated run itself violates such properties. These runtime analyses can be performed stand-alone to generate a set of warnings. It is furthermore demonstrated how these warnings can be used to guide a model checker, thereby reducing the search space. The described techniques have been implemented in the b e grown Java model checker called PathFinder.

  6. Starting a new residency program: a step-by-step guide for institutions, hospitals, and program directors

    Directory of Open Access Journals (Sweden)

    Michelle Barajaz

    2016-08-01

    Full Text Available Although our country faces a looming shortage of doctors, constraints of space, funding, and patient volume in many existing residency programs limit training opportunities for medical graduates. New residency programs need to be created for the expansion of graduate medical education training positions. Partnerships between existing academic institutions and community hospitals with a need for physicians can be a very successful means toward this end. Baylor College of Medicine and The Children's Hospital of San Antonio were affiliated in 2012, and subsequently, we developed and received accreditation for a new categorical pediatric residency program at that site in 2014. We share below a step-by-step guide through the process that includes building of the infrastructure, educational development, accreditation, marketing, and recruitment. It is our hope that the description of this process will help others to spur growth in graduate medical training positions.

  7. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    month; the necessary rate of a month; the quantities to be completed before half period of the project; the quantities to be achieved before the cold function test. Due to a lot of documents and equipment in LANP, it is impossible to present their supply dates one by one in the level 2 project schedule. The rules, in reference to the corresponding construction starting dates, were given to define the supply dates. The good practices of construction schedule control are presented, including draft of a construction program, performance evaluation, specific coordination meeting and Work Load Point application. The schedule control culture is described, that is one core, two criteria, three control mechanisms, four resources to be secured. (author)

  8. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  9. Verification and Optimization of a PLC Control Schedule

    NARCIS (Netherlands)

    Brinksma, Hendrik; Mader, Angelika H.; Havelund, K.; Penix, J.; Visser, W.

    We report on the use of the SPIN model checker for both the verification of a process control program and the derivation of optimal control schedules. This work was carried out as part of a case study for the EC VHS project (Verification of Hybrid Systems), in which the program for a Programmable

  10. Funding Sources for Community and Economic Development 1997: A Guide to Current Sources for Local Programs and Projects. Third Edition.

    Science.gov (United States)

    1997

    This guide contains information on 2,086 funding programs that provide support on national, state, and local levels for economic and community development, social services, and the humanities. The guide begins with "A Guide to Proposal Planning and Writing" (Lynn E. Miner), which includes strategies for locating information on public and private…

  11. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  12. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  13. Separation of left and right lungs using 3D information of sequential CT images and a guided dynamic programming algorithm

    Science.gov (United States)

    Park, Sang Cheol; Leader, Joseph Ken; Tan, Jun; Lee, Guee Sang; Kim, Soo Hyung; Na, In Seop; Zheng, Bin

    2011-01-01

    Objective this article presents a new computerized scheme that aims to accurately and robustly separate left and right lungs on CT examinations. Methods we developed and tested a method to separate the left and right lungs using sequential CT information and a guided dynamic programming algorithm using adaptively and automatically selected start point and end point with especially severe and multiple connections. Results the scheme successfully identified and separated all 827 connections on the total 4034 CT images in an independent testing dataset of CT examinations. The proposed scheme separated multiple connections regardless of their locations, and the guided dynamic programming algorithm reduced the computation time to approximately 4.6% in comparison with the traditional dynamic programming and avoided the permeation of the separation boundary into normal lung tissue. Conclusions The proposed method is able to robustly and accurately disconnect all connections between left and right lungs and the guided dynamic programming algorithm is able to remove redundant processing. PMID:21412104

  14. Development and use of schedules in education of elementary school children with ASD

    Directory of Open Access Journals (Sweden)

    Sharova Y.A.

    2015-09-01

    Full Text Available The work on preparedness for education of elementary school students with autism disorders can be greatly facilitated by the use of the methods that allow to structure child's knowledge about necessary changes. The use of schedules greatly facilitates the process of education, guiding and work on children's adaptation. The article describes stages of the work on inclusion and use of general and individual schedules in two groups of children with intellectual disabilities and autism spectrum disorders in preschool classes. This work was conducted in the Center for Psychological, Medical and Social Support to Children and Adolescents of the Moscow State University of Psychology and Education. The article contains examples of the use schedules to increase independence and to reduce anxiety in children with autism spectrum disorders.

  15. Evaluation of kiln-drying schedules for wild cherry wood (Cerasus avium)

    OpenAIRE

    Korkut, Süleyman; Ünsal, Öner; Kocaefe, Duygu; Aytin, Ayhan; Gökyar, Asli

    2013-01-01

    Wild cherry wood (Cerasus avium (L.) Monench) lumber with a nominal thickness of 5 cm from Duzce region in Turkey was dried through conventional kiln drying using two different programs which are unprotective drying schedules, and protective drying schedules. The aim was to obtain the most desirable kiln schedule for keeping the wood quality at an appropriate level up to final moisture content of 12±2% was reached. Intensity of warping (twist, bow, cup, crook) occurrence, superficial, interna...

  16. Commissioning and quality assurance of the x-ray volume imaging system of an image-guided radiotherapy capable linear accelerator

    International Nuclear Information System (INIS)

    Muralidhar, K.R.; Narayana Murthy, P.; Kumar, Rajneesh

    2008-01-01

    An Image-Guided Radiotherapy-capable linear accelerator (Elekta Synergy) was installed at our hospital, which is equipped with a kV x-ray volume imaging (XVI) system and electronic portal imaging device (iViewGT). The objective of this presentation is to describe the results of commissioning measurements carried out on the XVI facility to verify the manufacturer's specifications and also to evolve a QA schedule which can be used to test its performance routinely. The QA program consists of a series of tests (safety features, geometric accuracy, and image quality). These tests were found to be useful to assess the performance of the XVI system and also proved that XVI system is very suitable for image-guided high-precision radiation therapy. (author)

  17. Commissioning and quality assurance of the X-ray volume Imaging system of an image-guided radiotherapy capable linear accelerator

    Directory of Open Access Journals (Sweden)

    Muralidhar K

    2008-01-01

    Full Text Available An Image-Guided Radiotherapy-capable linear accelerator (Elekta Synergy was installed at our hospital, which is equipped with a kV x-ray volume imaging (XVI system and electronic portal imaging device (iViewGT. The objective of this presentation is to describe the results of commissioning measurements carried out on the XVI facility to verify the manufacturer′s specifications and also to evolve a QA schedule which can be used to test its performance routinely. The QA program consists of a series of tests (safety features, geometric accuracy, and image quality. These tests were found to be useful to assess the performance of the XVI system and also proved that XVI system is very suitable for image-guided high-precision radiation therapy.

  18. User guide for the SYVAC geosphere program GEO3

    International Nuclear Information System (INIS)

    Oldfield, S.G.; Broyd, T.W.

    1983-11-01

    A User Guide for the computer model GEO3, of radionuclide migration through a saturated or unsaturated, multi-layered rock strata. GEO3 uses either a numerical (unsaturated) or analytical (saturated) solution to equations of the one dimensional flow and three dimensional transport of radionuclides in the groundwater, including the effects of linear equilibrium sorption (for porous or fractured media), longitudinal and transverse dispersion, and chain decay for arbitrary chain lengths. The model is designed to be incorporated into the SYVAC (SYstems Variability Analysis Code) computer program, the function of which is to perform generic uncertainty assessments on hypothetical vault-geosphere-biosphere combinations, taking into account parameter variability and uncertainty. (author)

  19. Stephen Hawking's Universe. Teacher's Guide.

    Science.gov (United States)

    Thompson, Malcolm H.; Rameau, Jonathan D.

    This program guide is meant to help teachers assist their students in viewing the six-part public television series, "Stephen Hawking's Universe." The guide features program summaries that give background information and brief synopses of the programs; previewing activities that familiarize students with the subject; vocabulary that…

  20. Contagious flexibility? A study on whether schedule flexibility facilitates work-life enrichment.

    Science.gov (United States)

    Pedersen, Vivi Bach; Jeppesen, Hans Jeppe

    2012-08-01

    Schedule flexibility defines an important generating resource for work-life enrichment; however, our knowledge about how such spillovers take place is limited. This multiple case study examines how workers from different working time contexts with varying levels of schedule flexibility experience work-life interplay. Given the adopted explorative design, it is important to interpret the findings in a tentative light. Nonetheless, the study offers important insight into work-life enrichment that may guide future research in this field. The findings indicate that schedule flexibility may act as a boundary-spanning resource owing to the agency potential it offers workers. Thus, it seemed that flexible schedule opportunities enabled workers to engage more fully in personal life activities, which in turn had a positive influence on their work involvement through positive affect. Such positive role engagements appeared, however, to be greatly determined by workers' boundary management and by time conditions of work and family. In conclusion, the major findings and limitation of the study are discussed against existing research and theory. © 2012 The Authors. Scandinavian Journal of Psychology © 2012 The Scandinavian Psychological Associations.

  1. Artificial intelligence techniques for scheduling Space Shuttle missions

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.

    1994-01-01

    Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

  2. Shift scheduling model considering workload and worker’s preference for security department

    Science.gov (United States)

    Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT

    2018-04-01

    Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.

  3. CellSs: Scheduling Techniques to Better Exploit Memory Hierarchy

    Directory of Open Access Journals (Sweden)

    Pieter Bellens

    2009-01-01

    Full Text Available Cell Superscalar's (CellSs main goal is to provide a simple, flexible and easy programming approach for the Cell Broadband Engine (Cell/B.E. that automatically exploits the inherent concurrency of the applications at a task level. The CellSs environment is based on a source-to-source compiler that translates annotated C or Fortran code and a runtime library tailored for the Cell/B.E. that takes care of the concurrent execution of the application. The first efforts for task scheduling in CellSs derived from very simple heuristics. This paper presents new scheduling techniques that have been developed for CellSs for the purpose of improving an application's performance. Additionally, the design of a new scheduling algorithm is detailed and the algorithm evaluated. The CellSs scheduler takes an extension of the memory hierarchy for Cell/B.E. into account, with a cache memory shared between the SPEs. All new scheduling practices have been evaluated showing better behavior of our system.

  4. Double-shell tank waste system assessment status and schedule

    International Nuclear Information System (INIS)

    Walter, E.J.

    1995-01-01

    The integrated program for completing the integrity assessments of the dangerous waste tank systems managed by the Tank Waste Remediation System (TWRS) Division of Westinghouse Hanford Company is presented in the Tank Waste Remediation System Tank System Integrity Assessments Program Plan, WHC-SD-AP017, Rev. 1. The program plan identified the assessment requirements and the general scope to which these requirements applied. Some of these assessment requirements have been met and others are either in process of completion or scheduled to be worked. To define the boundary of the double-shell tank (DST) system and the boundaries of the DST system components (or system parts) for the purpose of performing integrity assessment activities; To identify the planned activities to meet the assessment requirements for each component; Provide the status of the assessment activities; and Project a five year assessment activity schedule

  5. Nuclear Engine System Simulation (NESS). Version 2.0: Program user's guide. Final Report

    International Nuclear Information System (INIS)

    Pelaccio, D.G.; Scheil, C.M.; Petrosky, L.

    1993-03-01

    This Program User's Guide discusses the Nuclear Thermal Propulsion (NTP) engine system design features and capabilities modeled in the Nuclear Engine System Simulation (NESS): Version 2.0 program (referred to as NESS throughout the remainder of this document), as well as its operation. NESS was upgraded to include many new modeling capabilities not available in the original version delivered to NASA LeRC in Dec. 1991, NESS's new features include the following: (1) an improved input format; (2) an advanced solid-core NERVA-type reactor system model (ENABLER 2); (3) a bleed-cycle engine system option; (4) an axial-turbopump design option; (5) an automated pump-out turbopump assembly sizing option; (6) an off-design gas generator engine cycle design option; (7) updated hydrogen properties; (8) an improved output formnd (9) personal computer operation capability. Sample design cases are presented in the user's guide that demonstrate many of the new features associated with this upgraded version of NESS, as well as design modeling features associated with the original version of NESS

  6. Bilevel Fuzzy Chance Constrained Hospital Outpatient Appointment Scheduling Model

    Directory of Open Access Journals (Sweden)

    Xiaoyang Zhou

    2016-01-01

    Full Text Available Hospital outpatient departments operate by selling fixed period appointments for different treatments. The challenge being faced is to improve profit by determining the mix of full time and part time doctors and allocating appointments (which involves scheduling a combination of doctors, patients, and treatments to a time period in a department optimally. In this paper, a bilevel fuzzy chance constrained model is developed to solve the hospital outpatient appointment scheduling problem based on revenue management. In the model, the hospital, the leader in the hierarchy, decides the mix of the hired full time and part time doctors to maximize the total profit; each department, the follower in the hierarchy, makes the decision of the appointment scheduling to maximize its own profit while simultaneously minimizing surplus capacity. Doctor wage and demand are considered as fuzzy variables to better describe the real-life situation. Then we use chance operator to handle the model with fuzzy parameters and equivalently transform the appointment scheduling model into a crisp model. Moreover, interactive algorithm based on satisfaction is employed to convert the bilevel programming into a single level programming, in order to make it solvable. Finally, the numerical experiments were executed to demonstrate the efficiency and effectiveness of the proposed approaches.

  7. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  8. Day-ahead resource scheduling of a renewable energy based virtual power plant

    International Nuclear Information System (INIS)

    Zamani, Ali Ghahgharaee; Zakariazadeh, Alireza; Jadid, Shahram

    2016-01-01

    Highlights: • Simultaneous energy and reserve scheduling of a VPP. • Aggregate uncertainties of electricity prices, renewable generation and load demand. • Develop a stochastic scheduling model using the point estimate method. - Abstract: The evolution of energy markets is accelerating in the direction of a greater reliance upon distributed energy resources (DERs). To manage this increasing two-way complexity, virtual power plants (VPPs) are being deployed today all over the world. In this paper, a probabilistic model for optimal day ahead scheduling of electrical and thermal energy resources in a VPP is proposed where participation of energy storage systems and demand response programs (DRPs) are also taken into account. In the proposed model, energy and reserve is simultaneously scheduled considering the uncertainties of market prices, electrical demand and intermittent renewable power generation. The Point Estimate Method (PEM) is applied in order to model the uncertainties of VPP’s scheduling problem. Moreover, the optimal reserve scheduling of VPP is presented which efficiently decreases VPP’s risk facing the unexpected fluctuations of uncertain parameters at the power delivery time. The results demonstrated that implementation of demand response programs (DRPs) would decrease total operation costs of VPP as well as its dependency on the upstream network.

  9. Defense programs beryllium good practice guide

    Energy Technology Data Exchange (ETDEWEB)

    Herr, M.

    1997-07-01

    Within the DOE, it has recently become apparent that some contractor employees who have worked (or are currently working) with and around beryllium have developed chronic beryllium disease (CBD), an occupational granulomatous lung disorder. Respiratory exposure to aerosolized beryllium, in susceptible individuals, causes an immunological reaction that can result in granulomatous scarring of the lung parenchyma, shortness of breath, cough, fatigue, weight loss, and, ultimately, respiratory failure. Beryllium disease was originally identified in the 1940s, largely in the fluorescent light industry. In 1950, the Atomic Energy Commission (AEC) introduced strict exposure standards that generally curtailed both the acute and chronic forms of the disease. Beginning in 1984, with the identification of a CBD case in a DOE contractor worker, there was increased scrutiny of both industrial hygiene practices and individuals in this workforce. To date, over 100 additional cases of beryllium-specific sensitization and/or CBD have been identified. Thus, a disease previously thought to be largely eliminated by the adoption of permissible exposure standards 45 years ago is still a health risk in certain workforces. This good practice guide forms the basis of an acceptable program for controlling workplace exposure to beryllium. It provides (1) Guidance for minimizing worker exposure to beryllium in Defense Programs facilities during all phases of beryllium-related work, including the decontamination and decommissioning (D&D) of facilities. (2) Recommended controls to be applied to the handling of metallic beryllium and beryllium alloys, beryllium oxide, and other beryllium compounds. (3) Recommendations for medical monitoring and surveillance of workers exposed (or potentially exposed) to beryllium, based on the best current understanding of beryllium disease and medical diagnostic tests available. (4) Site-specific safety procedures for all processes of beryllium that is likely to

  10. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  11. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  12. Virginia State Adult Basic Education Administrative Guide for Local Programs and Projects under the Adult Education Act, P.L. 91-230 and Amendments.

    Science.gov (United States)

    Virginia State Dept. of Education, Richmond. Adult Education Service.

    This administrative guide was developed to provide local school divisions and other agencies operating federally funded Adult Basic Education (ABE) programs in Virginia with the purpose, requirements, and procedures for conducting these programs. The guide is divided into eleven sections. The introduction covers the purpose and scope of ABE…

  13. Security programs for Category I or II nuclear material or certain nuclear facilities. Regulatory guide G-274

    International Nuclear Information System (INIS)

    2003-03-01

    The purpose of this regulatory guide is to help applicants for a Canadian Nuclear Safety Commission (CNSC) licence in respect of Category I or II nuclear material - other than a licence to transport - , or a nuclear facility consisting of a nuclear reactor that may exceed 10 MW thermal power during normal operation, prepare and submit the security information to be included with the application, pursuant to the Nuclear Safety and Control Act (NSCA). Category I and II nuclear material are defined in Appendix B to this guide. This guide describes: the security information that should typically be included with the application for any licence referred to above; how the security information may be organized and presented in a separate document (hereinafter 'the security program description'), in order to assist CNSC review and processing of the application; and, the administrative procedures to be followed when preparing, submitting or revising the security program description. (author)

  14. A greedy double swap heuristic for nurse scheduling

    Directory of Open Access Journals (Sweden)

    Murphy Choy

    2012-10-01

    Full Text Available One of the key challenges of nurse scheduling problem (NSP is the number of constraints placed on preparing the timetable, both from the regulatory requirements as well as the patients’ demand for the appropriate nursing care specialists. In addition, the preferences of the nursing staffs related to their work schedules add another dimension of complexity. Most solutions proposed for solving nurse scheduling involve the use of mathematical programming and generally considers only the hard constraints. However, the psychological needs of the nurses are ignored and this resulted in subsequent interventions by the nursing staffs to remedy any deficiency and often results in last minute changes to the schedule. In this paper, we present a staff preference optimization framework solved with a greedy double swap heuristic. The heuristic yields good performance in speed at solving the problem. The heuristic is simple and we will demonstrate its performance by implementing it on open source spreadsheet software.

  15. The Simultaneous Vehicle Scheduling and Passenger Service Problem

    DEFF Research Database (Denmark)

    Petersen, Hanne Løhmann; Larsen, Allan; Madsen, Oli B.G.

    2013-01-01

    , by modifying the timetable. The planning approach is referred to as the simultaneous vehicle scheduling and passenger service problem (SVSPSP). The SVSPSP is modelled as an integer programming problem and solved using a large neighborhood search metaheuristic. The proposed framework is tested on data inspired......Passengers using public transport systems often experience waiting times when transferring between two scheduled services. In this paper we propose a planning approach that seeks to obtain a favourable trade-off between the two contrasting objectives, passenger service and operating cost...

  16. Robust optimization for load scheduling of a smart home with photovoltaic system

    International Nuclear Information System (INIS)

    Wang, Chengshan; Zhou, Yue; Jiao, Bingqi; Wang, Yamin; Liu, Wenjian; Wang, Dan

    2015-01-01

    Highlights: • Robust household load scheduling is presented for smart homes with PV system. • A robust counterpart is formulated to deal with PV output uncertainty. • The robust counterpart is finally transformed to a quadratic programming problem. • Load schedules with different robustness can be made by the proposed method. • Feed-in tariff and PV output would affect the significance of the proposed method. - Abstract: In this paper, a robust approach is developed to tackle the uncertainty of PV power output for load scheduling of smart homes integrated with household PV system. Specifically, a robust formulation is proposed and further transformed to an equivalent quadratic programming problem. Day-ahead load schedules with different robustness can be generated by solving the proposed robust formulation with different predefined parameters. The validity and advantage of the proposed approach has been verified by simulation results. Also, the effects of feed-in tariff and PV output have been evaluated

  17. Shop Floor Scheduling for Program Depot Maintenance Considering Stochastic Repair Needs

    National Research Council Canada - National Science Library

    Gemmill, Douglas

    2000-01-01

    .... The research resulted in the development of a new method to identify the critical path within resource-constrained project scheduling problems, heuristic search methods that improved overall project...

  18. Inter-terminal transfer between port terminals. A continuous mathematical programming model to optimize scheduling and deployment of transport units

    Energy Technology Data Exchange (ETDEWEB)

    Morales Fusco, P.; Pedrielli, G.; Zhou, C.; Hay Lee, L.; Peng Chew, E.

    2016-07-01

    In most large port cities, the challenge of inter-terminal transfers (ITT) prevails due to the long distance between multiple terminals. The quantity of containers requiring movement between terminals as they connect from pre-carrier to on-carrier is increasing with the formation of the mega-alliances. The paper proposes a continuous time mathematical programming model to optimize the deployment and schedule of trucks and barges to minimize the number of operating transporters, their makespan, costs and the distance travelled by the containers by choosing the right combination of transporters and container movements while fulfilling time window restrictions imposed on reception of the containers. A multi-step routing problem is developed where transporters can travel from one terminal to another and/or load or unload containers from a specific batch at each step. The model proves successful in identifying the costless schedule and means of transportation. And a sensibility analysis over the parameters used is provided. (Author)

  19. A Model for Infusing Energy Concepts into Vocational Education Programs. Solar Energy Curriculum Guide.

    Science.gov (United States)

    Delta Vocational Technical School, Marked Tree, AR.

    This solar energy curriculum guide is designed to assist teachers in infusing energy concepts into vocational education programs. It consists of 31 competency-based instructional units organized into 10 sections. Covered in the sections are the following topics: related instructions (history and development; human relations; general safety;…

  20. Human Resources Management: Onboarding Program and Trainer's Guide for Charter School Employees

    Science.gov (United States)

    Cook, Jeannette

    2016-01-01

    The applied dissertation project focused on the development of a comprehensive onboarding program and Trainer's Guide specifically developed for charter school management employees. Charter school education has grown significantly in the last several decades with over 6,100 charter schools that are currently serving students nationwide. Formal or…

  1. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  2. Pay for performance programs in Australia: a need for guiding principles.

    Science.gov (United States)

    Scott, Ian A

    2008-11-01

    Pay-for-performance (P4P) programs which reward clinical providers with incentive payments based on one or more measures of quality of care are now common in the United States and the United Kingdom and it is likely they will attract increasing interest in Australia. However, empirical evidence demonstrating effectiveness of such programs is limited and many existing programs have not had rigorous outcome evaluation. To maximise success, future P4P programs should incorporate the lessons and insights obtained from previous experience. Based on a review of published trials, program evaluations and position statements, the following principles that may guide future program design and implementation were synthesised: 1) formulate a rationale and a business case for P4P; 2) use established evidence-based performance measures; 3) use rigorous and verifiable methods of data collection and analysis; 4) define performance targets using absolute and relative thresholds; 5) use rewards that are sufficient, equitable and transparent; 6) address appropriateness of provider responses and avoid perverse incentives; 7) implement communication and feedback strategies; 8) use existing organisational structures to implement P4P programs; 9) attribute credit for performance to participants in ways that foster population-based perspectives; and 10) invest in outcomes and health service research. Recommendations flowing from these principles relevant to Australian settings are provided.

  3. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  4. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    Science.gov (United States)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  5. An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

    Directory of Open Access Journals (Sweden)

    Lianfei Yu

    2017-01-01

    Full Text Available Efficient scheduling for the supporting operations of aircrafts in flight deck is critical to the aircraft carrier, and even several seconds’ improvement may lead to totally converse outcome of a battle. In the paper, we ameliorate the supporting operations of carrier-based aircrafts and investigate three simultaneous operation relationships during the supporting process, including precedence constraints, parallel operations, and sequence flexibility. Furthermore, multifunctional aircrafts have to take off synergistically and participate in a combat cooperatively. However, their takeoff order must be restrictively prioritized during the scheduling period accorded by certain operational regulations. To efficiently prioritize the takeoff order while minimizing the total time budget on the whole takeoff duration, we propose a novel mixed integer liner programming formulation (MILP for the flight deck scheduling problem. Motivated by the hardness of MILP, we design an improved differential evolution algorithm combined with typical local search strategies to improve computational efficiency. We numerically compare the performance of our algorithm with the classical genetic algorithm and normal differential evolution algorithm and the results show that our algorithm obtains better scheduling schemes that can meet both the operational relations and the takeoff priority requirements.

  6. FMEF Electrical single line diagram and panel schedule verification process

    International Nuclear Information System (INIS)

    Fong, S.K.

    1998-01-01

    Since the FMEF did not have a mission, a formal drawing verification program was not developed, however, a verification process on essential electrical single line drawings and panel schedules was established to benefit the operations lock and tag program and to enhance the electrical safety culture of the facility. The purpose of this document is to provide a basis by which future landlords and cognizant personnel can understand the degree of verification performed on the electrical single lines and panel schedules. It is the intent that this document be revised or replaced by a more formal requirements document if a mission is identified for the FMEF

  7. Guide to federal water quality programs and information: A guide with computer software developed by the interagency work group on water quality

    International Nuclear Information System (INIS)

    1993-02-01

    The publication makes key Federal information on water quality available to environmental analysts. The Guide includes information on (1) underlying demographic pressures; (2) the use of land, water, and resources; (3) pollutant loadings; (4) ambient water quality; (5) other effects of water pollution; and (6) a listing of programs established to preserve, protect and restore water quality

  8. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  9. Blending the Roles of Interpreter, Entrepreneur, Collaborator. A New Model for Conferences and Institutes Program Planners. The Guide Series.

    Science.gov (United States)

    Dahl, Carolyn Carson

    This six-chapter guide suggests a new approach to describing the knowledge, competencies, and managerial roles inherent in planning effective conferences and institutes. Chapter 1 introduces the many roles of the conferences and institutes program planner and discusses program formats and what makes conference programs unique learning events.…

  10. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  11. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  12. YRE Program Guide.

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Div. of School Facilities Planning.

    This report examines single- and multi-track educational programs as found in California's public school system, explores the pros and cons of using year-round education (YRE) programs, and how to implement these programs. Each year-round tracking system is detailed using each of their calendars in a side-by-side comparison along with the…

  13. Evaluation of a Standardized Program for Training Practicing Anesthesiologists in Ultrasound-Guided Regional Anesthesia Skills.

    Science.gov (United States)

    Mariano, Edward R; Harrison, T Kyle; Kim, T Edward; Kan, Jack; Shum, Cynthia; Gaba, David M; Ganaway, Toni; Kou, Alex; Udani, Ankeet D; Howard, Steven K

    2015-10-01

    Practicing anesthesiologists have generally not received formal training in ultrasound-guided perineural catheter insertion. We designed this study to determine the efficacy of a standardized teaching program in this population. Anesthesiologists in practice for 10 years or more were recruited and enrolled to participate in a 1-day program: lectures and live-model ultrasound scanning (morning) and faculty-led iterative practice and mannequin-based simulation (afternoon). Participants were assessed and recorded while performing ultrasound-guided perineural catheter insertion at baseline, at midday (interval), and after the program (final). Videos were scored by 2 blinded reviewers using a composite tool and global rating scale. Participants were surveyed every 3 months for 1 year to report the number of procedures, efficacy of teaching methods, and implementation obstacles. Thirty-two participants were enrolled and completed the program; 31 of 32 (97%) completed the 1-year follow-up. Final scores [median (10th-90th percentiles)] were 21.5 (14.5-28.0) of 30 points compared to 14.0 (9.0-20.0) at interval (P < .001 versus final) and 12.0 (8.5-17.5) at baseline (P < .001 versus final), with no difference between interval and baseline. The global rating scale showed an identical pattern. Twelve of 26 participants without previous experience performed at least 1 perineural catheter insertion after training (P < .001). However, there were no differences in the monthly average number of procedures or complications after the course when compared to baseline. Practicing anesthesiologists without previous training in ultrasound-guided regional anesthesia can acquire perineural catheter insertion skills after a 1-day standardized course, but changing clinical practice remains a challenge. © 2015 by the American Institute of Ultrasound in Medicine.

  14. Steerability Analysis of Tracked Vehicles: Theory and User’s Guide for Computer Program TVSTEER

    Science.gov (United States)

    1986-08-01

    Baladi , Donald E. Barnes, Rebecca P. BergerC oStructures Laboratory NDEPARTMENT OF THE ARMY ___ Waterways Experiment Station, Corps of Engineers . U P0 Box...Analysis of Tracked Vehicles: Theory and User’s Guide for Computer Program TVSTEER - 12 PERSONAL AUTHOR(S) Baladi , George Y., Barnes, Donald E...mathematical model was formulated by Drs. George Y. Baladi and Behzad Rohani. The logic and computer programming were accomplished by Dr. Baladi and

  15. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  16. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  17. Model Predictive Control of a Nonlinear System with Known Scheduling Variable

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2012-01-01

    Model predictive control (MPC) of a class of nonlinear systems is considered in this paper. We will use Linear Parameter Varying (LPV) model of the nonlinear system. By taking the advantage of having future values of the scheduling variable, we will simplify state prediction. Consequently...... the control problem of the nonlinear system is simplied into a quadratic programming. Wind turbine is chosen as the case study and we choose wind speed as the scheduling variable. Wind speed is measurable ahead of the turbine, therefore the scheduling variable is known for the entire prediction horizon....

  18. An improved formulation of the underground mine scheduling ...

    African Journals Online (AJOL)

    2014-06-12

    Jun 12, 2014 ... the mine scheduling optimisation problem for both open pit and ... that involves the iterative solving of the linear programming ... methods is discussed in §4 and the concept of a mining-method-dependent grade tonnage.

  19. Algorithms for Scheduling and Network Problems

    Science.gov (United States)

    1991-09-01

    time. We already know, by Lemma 2.2.1, that WOPT = O(log( mpU )), so if we could solve this integer program optimally we would be done. However, the...Folydirat, 15:177-191, 1982. [6] I.S. Belov and Ya. N. Stolin. An algorithm in a single path operations scheduling problem. In Mathematical Economics and

  20. Constraint optimization model of a scheduling problem for a robotic arm in automatic systems

    DEFF Research Database (Denmark)

    Kristiansen, Ewa; Smith, Stephen F.; Kristiansen, Morten

    2014-01-01

    are characteristics of the painting process application itself. Unlike spot-welding, painting tasks require movement of the entire robot arm. In addition to minimizing intertask duration, the scheduler must strive to maximize painting quality and the problem is formulated as a multi-objective optimization problem....... The scheduling model is implemented as a stand-alone module using constraint programming, and integrated with a larger automatic system. The results of a number of simulation experiments with simple parts are reported, both to characterize the functionality of the scheduler and to illustrate the operation...... of the entire software system for automatic generation of robot programs for painting....

  1. School Programs To Prevent Smoking: The National Cancer Institute Guide to Strategies That Succeed.

    Science.gov (United States)

    Glynn, Thomas J.

    This guide to school-based smoking prevention programs for educators is the product of five years of work to prevent cancer. The National Cancer Institute (NCI) is currently funding 23 coordinated intervention trials directed at youth. Although not all the studies are complete, sufficient results are available to recommend the most effective…

  2. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  3. Cost Control Guide For Decommissioning Of Nuclear Installations

    International Nuclear Information System (INIS)

    2013-01-01

    This cost control guide was prepared in response to the request from the OECD/NEA Working Party on Decommissioning and Dismantling (WPDD) - Decommissioning Cost Estimation Group (DCEG) to offer the industry guidance in preparing and implementing cost and schedule controls during decommissioning. The DCEG sent out a survey questionnaire in 2010 soliciting comments from OECD member states on their use of cost controls during decommissioning. While the response was limited, the consensus was to proceed with the preparation of this guide. Cost and schedule control systems have been in use for more than 30 years, and in the last 10 years or so have evolved into a more formalised earned value management system (EVMS). This guide is based on the internationally recognised standard, Earned Value Management Systems (ANSI, 2007). The EVMS is built on a work breakdown structure (WBS) of decommissioning activities, and a defined process for controlling a project. The EVMS not only provides measurement of project status and future performance, but also builds a structure and culture for accountability on project performance. This guide describes the performance metrics used to determine the value earned based on what was planned to be done, what was actually accomplished and what it actually cost. Variances measured monthly at a minimum indicate where potential problems are arising and raise a flag for the project manager to implement corrective actions for the next reporting period. The success of the EVMS programme depends on management commitment to implement a culture change for its employees, and to impose the EVMS on potential future contractors performing decommissioning work at a facility. Formal training is required to ensure all elements of the process are understood and put into action. It is recommended to begin with a small project, and graduate to larger projects as the staff learns how to use the system. The EVMS process has been used internationally for small

  4. 20 CFR 25.202 - How is the Special Schedule applied for Japanese seamen?

    Science.gov (United States)

    2010-04-01

    ... Japanese seamen? 25.202 Section 25.202 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS... How is the Special Schedule applied for Japanese seamen? (a) The special schedule of compensation... United States or Canada by direct-hire Japanese seamen who are neither citizens nor residents of the...

  5. 40 CFR 256.26 - Requirement for schedules leading to compliance with the prohibition of open dumping.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Requirement for schedules leading to... SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.26 Requirement for schedules leading to... schedule of remedial measures, and an enforceable sequence of actions, leading to compliance within a...

  6. Scheduling language and algorithm development study. Volume 2: Use of the basic language and module library

    Science.gov (United States)

    Chamberlain, R. A.; Cornick, D. E.; Flater, J. F.; Odoherty, R. J.; Peterson, F. M.; Ramsey, H. R.; Willoughby, J. K.

    1974-01-01

    The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.

  7. Standard guide for establishing a quality assurance program for uranium conversion facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2004-01-01

    1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use. 1.3 The basic elements of a quality assurance program appear in the following order: FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures & Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20 TABLE 1 NQA-1 Basic Requirements Relat...

  8. Defense programs beryllium good practice guide

    International Nuclear Information System (INIS)

    Herr, M.

    1997-07-01

    Within the DOE, it has recently become apparent that some contractor employees who have worked (or are currently working) with and around beryllium have developed chronic beryllium disease (CBD), an occupational granulomatous lung disorder. Respiratory exposure to aerosolized beryllium, in susceptible individuals, causes an immunological reaction that can result in granulomatous scarring of the lung parenchyma, shortness of breath, cough, fatigue, weight loss, and, ultimately, respiratory failure. Beryllium disease was originally identified in the 1940s, largely in the fluorescent light industry. In 1950, the Atomic Energy Commission (AEC) introduced strict exposure standards that generally curtailed both the acute and chronic forms of the disease. Beginning in 1984, with the identification of a CBD case in a DOE contractor worker, there was increased scrutiny of both industrial hygiene practices and individuals in this workforce. To date, over 100 additional cases of beryllium-specific sensitization and/or CBD have been identified. Thus, a disease previously thought to be largely eliminated by the adoption of permissible exposure standards 45 years ago is still a health risk in certain workforces. This good practice guide forms the basis of an acceptable program for controlling workplace exposure to beryllium. It provides (1) Guidance for minimizing worker exposure to beryllium in Defense Programs facilities during all phases of beryllium-related work, including the decontamination and decommissioning (D ampersand D) of facilities. (2) Recommended controls to be applied to the handling of metallic beryllium and beryllium alloys, beryllium oxide, and other beryllium compounds. (3) Recommendations for medical monitoring and surveillance of workers exposed (or potentially exposed) to beryllium, based on the best current understanding of beryllium disease and medical diagnostic tests available. (4) Site-specific safety procedures for all processes of beryllium that is

  9. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  10. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  11. User's Guide to the Weighted-Multiple-Linear Regression Program (WREG version 1.0)

    Science.gov (United States)

    Eng, Ken; Chen, Yin-Yu; Kiang, Julie.E.

    2009-01-01

    Streamflow is not measured at every location in a stream network. Yet hydrologists, State and local agencies, and the general public still seek to know streamflow characteristics, such as mean annual flow or flood flows with different exceedance probabilities, at ungaged basins. The goals of this guide are to introduce and familiarize the user with the weighted multiple-linear regression (WREG) program, and to also provide the theoretical background for program features. The program is intended to be used to develop a regional estimation equation for streamflow characteristics that can be applied at an ungaged basin, or to improve the corresponding estimate at continuous-record streamflow gages with short records. The regional estimation equation results from a multiple-linear regression that relates the observable basin characteristics, such as drainage area, to streamflow characteristics.

  12. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  13. A Heuristic Approach for Determining Lot Sizes and Schedules Using Power-of-Two Policy

    Directory of Open Access Journals (Sweden)

    Esra Ekinci

    2007-01-01

    Full Text Available We consider the problem of determining realistic and easy-to-schedule lot sizes in a multiproduct, multistage manufacturing environment. We concentrate on a specific type of production, namely, flow shop type production. The model developed consists of two parts, lot sizing problem and scheduling problem. In lot sizing problem, we employ binary integer programming and determine reorder intervals for each product using power-of-two policy. In the second part, using the results obtained of the lot sizing problem, we employ mixed integer programming to determine schedules for a multiproduct, multistage case with multiple machines in each stage. Finally, we provide a numerical example and compare the results with similar methods found in practice.

  14. Urban Stormwater Runoff. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    Science.gov (United States)

    Simko, Robert A.

    Urban stormwater runoff collects pollutants from many parts of a city and is an important consideration in water quality planning. Presented is an instructor's guide for a learning session covering various aspects of urban runoff including pollutant sources, management practices, and regulatory programs. Intended for citizen advisory groups, this…

  15. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    Science.gov (United States)

    1987-09-15

    LOGISTIC SUPPORT (ILS) COST ESTIMATE SCODE NUMBER: NONE -ESPONSIBILITY: ROY & ILS ’,!,RATION: 22.00 WORK DAYS A-221 * .9 ..- 9 * PAGE: .LSMTEST SCHEDULE: CE...0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...RESPONSIBILITY: BELVOIR LAB DURATION: 20.00 WORK DAYS ENG DE I SCHEDULE: DV ENGINEERING DESIGN INITIATED. CODE NUMBER: NONE RESPONSIBILITY: BELVOIR LAB

  16. A Comparison of the DISASTER (Trademark) Scheduling Software with a Simultaneous Scheduling Algorithm for Minimizing Maximum Tardiness in Job Shops

    Science.gov (United States)

    1993-09-01

    goal ( Heizer , Render , and Stair, 1993:94). Integer Prgronmming. Integer programming is a general purpose approach used to optimally solve job shop...Scheduling," Operations Research Journal. 29, No 4: 646-667 (July-August 1981). Heizer , Jay, Barry Render and Ralph M. Stair, Jr. Production and Operations

  17. Managerial Accounting. Study Guide.

    Science.gov (United States)

    Plachta, Leonard E.

    This self-instructional study guide is part of the materials for a college-level programmed course in managerial accounting. The study guide is intended for use by students in conjuction with a separate textbook, Horngren's "Accounting for Management Control: An Introduction," and a workbook, Curry's "Student Guide to Accounting for Management…

  18. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  19. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  20. Scheduling language and algorithm development study. Volume 1: Study summary and overview

    Science.gov (United States)

    1974-01-01

    A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

  1. Optimized Waterspace Management and Scheduling Using Mixed-Integer Linear Programming

    Science.gov (United States)

    2016-01-01

    PANAMA CITY DIVISION PANAMA CITY, FLORIDA 32407-7001 5(3257...task. This paper is outlined as follows: in Section 2, we discuss the general setup of the the MCM scheduling problem, including the definition of the...Suite 1425 Arlington, VA 22203-1995 Naval Surface Warfare Center, Panama City Division 1 ATTN: Technical Library 110 Vernon Avenue Panama City, FL 32407 27

  2. Design of problem-specific evolutionary algorithm/mixed-integer programming hybrids: two-stage stochastic integer programming applied to chemical batch scheduling

    Science.gov (United States)

    Urselmann, Maren; Emmerich, Michael T. M.; Till, Jochen; Sand, Guido; Engell, Sebastian

    2007-07-01

    Engineering optimization often deals with large, mixed-integer search spaces with a rigid structure due to the presence of a large number of constraints. Metaheuristics, such as evolutionary algorithms (EAs), are frequently suggested as solution algorithms in such cases. In order to exploit the full potential of these algorithms, it is important to choose an adequate representation of the search space and to integrate expert-knowledge into the stochastic search operators, without adding unnecessary bias to the search. Moreover, hybridisation with mathematical programming techniques such as mixed-integer programming (MIP) based on a problem decomposition can be considered for improving algorithmic performance. In order to design problem-specific EAs it is desirable to have a set of design guidelines that specify properties of search operators and representations. Recently, a set of guidelines has been proposed that gives rise to so-called Metric-based EAs (MBEAs). Extended by the minimal moves mutation they allow for a generalization of EA with self-adaptive mutation strength in discrete search spaces. In this article, a problem-specific EA for process engineering task is designed, following the MBEA guidelines and minimal moves mutation. On the background of the application, the usefulness of the design framework is discussed, and further extensions and corrections proposed. As a case-study, a two-stage stochastic programming problem in chemical batch process scheduling is considered. The algorithm design problem can be viewed as the choice of a hierarchical decision structure, where on different layers of the decision process symmetries and similarities can be exploited for the design of minimal moves. After a discussion of the design approach and its instantiation for the case-study, the resulting problem-specific EA/MIP is compared to a straightforward application of a canonical EA/MIP and to a monolithic mathematical programming algorithm. In view of the

  3. Compulsory Education in Italian Middle School Music Departments and the Music Education Act : Textbooks Associated with the 1963 Program and Guide to Music Education

    OpenAIRE

    大野内, 愛

    2015-01-01

    This paper aims to clarify the requirements for music education as part of general education in Italy through an assessment of the 1963 program, the music textbooks published by Ricordi during the implementation of that program, and the Guide to Music Education textbooks. I found that the textbooks focused on music theory, although the 1963 program emphasized practical training of students with a love of music. Further, the Guide to Music Education series was published specifically for use in...

  4. Audit Guide: Audits of Federal Student Financial Assistance Programs at Participating Institutions and Institution Servicers.

    Science.gov (United States)

    Office of Inspector General (ED), Washington, DC.

    All institutions participating in the Federal Student Financial Assistance Programs must have an annual financial aid compliance audit performed by an independent auditor. This guide is effective for fiscal years ending December 31, 1999, and thereafter, for institutions preparing for their yearly audit. The purpose of the document is to assist…

  5. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  6. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  7. NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services

    Science.gov (United States)

    Johnsen, Susan K., Ed.

    2012-01-01

    The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…

  8. What We Know about Guided Pathways: Helping Students to Complete Programs Faster. Research Overview

    Science.gov (United States)

    Bailey, Thomas; Jaggars, Shanna Smith; Jenkins, Davis

    2015-01-01

    The idea behind guided pathways is straightforward. College students are more likely to complete a degree in a timely fashion if they choose a program and develop an academic plan early on, have a clear road map of the courses they need to take to complete a credential, and receive guidance and support to help them stay on plan. However, most…

  9. Marketing and Society. Study Guide.

    Science.gov (United States)

    Welsh, Robert S.; Blake, Rowland S.

    This self-instructional study guide is part of the materials for a college-level programmed course entitled "Marketing and Society." The study guide is intended for use by students in conjunction with a related textbook, a workbook, a review guide, and a series of instructional tape casettes. The study guide contains a brief introductory section…

  10. A note on a model for quay crane scheduling with non-crossing constraints

    DEFF Research Database (Denmark)

    Santini, Alberto; Friberg, Henrik Alsing; Røpke, Stefan

    2015-01-01

    This article studies the quay crane scheduling problem with non-crossing constraints, which is an operational problem that arises in container terminals. An enhancement to a mixed integer programming model for the problem is proposed and a new class of valid inequalities is introduced. Computatio......This article studies the quay crane scheduling problem with non-crossing constraints, which is an operational problem that arises in container terminals. An enhancement to a mixed integer programming model for the problem is proposed and a new class of valid inequalities is introduced...

  11. Multi-objective scheduling of electric vehicles in smart distribution system

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economic operational scheduling of electric vehicles. • The Vehicle to Grid capability and the actual patterns of drivers are considered. • A novel conceptual model for an electric vehicle management system is proposed. - Abstract: When preparing for the widespread adoption of Electric Vehicles (EVs), an important issue is to use a proper EVs’ charging/discharging scheduling model that is able to simultaneously consider economic and environmental goals as well as technical constraints of distribution networks. This paper proposes a multi-objective operational scheduling method for charging/discharging of EVs in a smart distribution system. The proposed multi-objective framework, based on augmented ε-constraint method, aims at minimizing the total operational costs and emissions. The Vehicle to Grid (V2G) capability as well as the actual patterns of drivers are considered in order to generate the Pareto-optimal solutions. The Benders decomposition technique is used in order to solve the proposed optimization model and to convert the large scale mixed integer nonlinear problem into mixed-integer linear programming and nonlinear programming problems. The effectiveness of the proposed resources scheduling approach is tested on a 33-bus distribution test system over a 24-h period. The results show that the proposed EVs’ charging/discharging method can reduce both of operation cost and air pollutant emissions

  12. A General State-Space Formulation for Online Scheduling

    Directory of Open Access Journals (Sweden)

    Dhruv Gupta

    2017-11-01

    Full Text Available We present a generalized state-space model formulation particularly motivated by an online scheduling perspective, which allows modeling (1 task-delays and unit breakdowns; (2 fractional delays and unit downtimes, when using discrete-time grid; (3 variable batch-sizes; (4 robust scheduling through the use of conservative yield estimates and processing times; (5 feedback on task-yield estimates before the task finishes; (6 task termination during its execution; (7 post-production storage of material in unit; and (8 unit capacity degradation and maintenance. Through these proposed generalizations, we enable a natural way to handle routinely encountered disturbances and a rich set of corresponding counter-decisions. Thereby, greatly simplifying and extending the possible application of mathematical programming based online scheduling solutions to diverse application settings. Finally, we demonstrate the effectiveness of this model on a case study from the field of bio-manufacturing.

  13. 20 CFR 25.201 - How is the Special Schedule applied for employees in Australia?

    Science.gov (United States)

    2010-04-01

    ... employees in Australia? 25.201 Section 25.201 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS... How is the Special Schedule applied for employees in Australia? (a) The special schedule of compensation established by subpart B of this part shall apply in Australia with the modifications or additions...

  14. 78 FR 37570 - Certain Products Containing Interactive Program Guide and Parental Control Technology; Notice of...

    Science.gov (United States)

    2013-06-21

    ... Interactive Program Guide and Parental Control Technology; Notice of Request for Statements on the Public... questions regarding filing should contact the Secretary (202-205-2000). Any person desiring to submit a... taken under the authority of section 337 of the Tariff Act of 1930, as amended (19 U.S.C. 1337), and of...

  15. An Elastic Charging Service Fee-Based Load Guiding Strategy for Fast Charging Stations

    Directory of Open Access Journals (Sweden)

    Shu Su

    2017-05-01

    Full Text Available Compared with the traditional slow charging loads, random integration of large scale fast charging loads will exert more serious impacts on the security of power network operation. Besides, to maximize social benefits, effective scheduling strategies guiding fast charging behaviors should be formulated rather than simply increasing infrastructure construction investments on the power grid. This paper first analyzes the charging users’ various responses to an elastic charging service fee, and introduces the index of charging balance degree to a target region by considering the influence of fast charging loads on the power grid. Then, a multi-objective optimization model of the fast charging service fee is constructed, whose service fee can be further optimized by employing a fuzzy programming method. Therefore, both users’ satisfaction degree and the equilibrium of charging loads can be maintained simultaneously by reasonably guiding electric vehicles (EVs to different fast charging stations. The simulation results demonstrate the effectiveness of the proposed dynamic charging service pricing and the corresponding fast charging load guidance strategy.

  16. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    Science.gov (United States)

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  17. Guide to good practices for on-the-job training

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    The purpose of the Department of Energy (DOE) Guide to Good Practices for On-the-Job Training (OJT) is to provide DOE contractor organizations with information that can be used to modify existing programs or to develop new programs. This guide replaces the Guide to Good Practices for On-the-Job Training that was distributed to DOE and DOE contractors in 1987. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they can use the information in this guide to develop programs that apply to their facility. This guide can be used as an aid in the design and development of a facility's OJT programs and to assist the instructors who conduct OJT and performance tests in the areas of facility operations, maintenance, and technical supports.

  18. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  19. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  20. A guide to processing bat acoustic data for the North American Bat Monitoring Program (NABat)

    Science.gov (United States)

    Reichert, Brian; Lausen, Cori; Loeb, Susan; Weller, Ted; Allen, Ryan; Britzke, Eric; Hohoff, Tara; Siemers, Jeremy; Burkholder, Braden; Herzog, Carl; Verant, Michelle

    2018-06-14

    The North American Bat Monitoring Program (NABat) aims to improve the state of conservation science for all species of bats shared by the United States, Canada, and Mexico. To accomplish this goal, NABat offers guidance and standardized protocols for acoustic monitoring of bats. In this document, “A Guide to Processing Bat Acoustic Data for the North American Bat Monitoring Program (NABat),” we provide general recommendations and specific workflows for the process of identifying bat species from acoustic files recorded using the NABat stationary point and mobile transect acoustic monitoring protocols.

  1. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  2. Selecting electrode configurations for image-guided cochlear implant programming using template matching.

    Science.gov (United States)

    Zhang, Dongqing; Zhao, Yiyuan; Noble, Jack H; Dawant, Benoit M

    2018-04-01

    Cochlear implants (CIs) are neural prostheses that restore hearing using an electrode array implanted in the cochlea. After implantation, the CI processor is programmed by an audiologist. One factor that negatively impacts outcomes and can be addressed by programming is cross-electrode neural stimulation overlap (NSO). We have proposed a system to assist the audiologist in programming the CI that we call image-guided CI programming (IGCIP). IGCIP permits using CT images to detect NSO and recommend deactivation of a subset of electrodes to avoid NSO. We have shown that IGCIP significantly improves hearing outcomes. Most of the IGCIP steps are robustly automated but electrode configuration selection still sometimes requires manual intervention. With expertise, distance-versus-frequency curves, which are a way to visualize the spatial relationship learned from CT between the electrodes and the nerves they stimulate, can be used to select the electrode configuration. We propose an automated technique for electrode configuration selection. A comparison between this approach and one we have previously proposed shows that our method produces results that are as good as those obtained with our previous method while being generic and requiring fewer parameters.

  3. Compulsory Education in Italian Middle School Music Departments and the Music Education Act : Textbooks Associated with the 1963 Program and Guide to Music Education

    OpenAIRE

    Onouchi, Ai

    2015-01-01

    This paper aims to clarify the requirements for music education as part of general education in Italy through an assessment of the 1963 program, the music textbooks published by Ricordi during the implementation of that program, and the Guide to Music Education textbooks. I found that the textbooks focused on music theory, although the 1963 program emphasized practical training of students with a love of music. Further, the Guide to Music Education series was published specifically for use in...

  4. Optimal Scheduling of Residential Microgrids Considering Virtual Energy Storage System

    Directory of Open Access Journals (Sweden)

    Weiliang Liu

    2018-04-01

    Full Text Available The increasingly complex residential microgrids (r-microgrid consisting of renewable generation, energy storage systems, and residential buildings require a more intelligent scheduling method. Firstly, aiming at the radiant floor heating/cooling system widely utilized in residential buildings, the mathematical relationship between the operative temperature and heating/cooling demand is established based on the equivalent thermodynamic parameters (ETP model, by which the thermal storage capacity is analyzed. Secondly, the radiant floor heating/cooling system is treated as virtual energy storage system (VESS, and an optimization model based on mixed-integer nonlinear programming (MINLP for r-microgrid scheduling is established which takes thermal comfort level and economy as the optimization objectives. Finally, the optimal scheduling results of two typical r-microgrids are analyzed. Case studies demonstrate that the proposed scheduling method can effectively employ the thermal storage capacity of radiant floor heating/cooling system, thus lowering the operating cost of the r-microgrid effectively while ensuring the thermal comfort level of users.

  5. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  6. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  7. Maintainability design guide

    International Nuclear Information System (INIS)

    Pack, R.W.

    1985-01-01

    The Human Factors Design Guide for Maintainability provides guidance for systematically incorporating good human factors techniques into the design of power plants. The guide describes a means of developing a comprehensive program plan to ensure compliance with the human factors approaches specified by the utility. The guide also provides specific recommendations for design practices, with examples, bases, and references. The recommendations are formatted for easy use by nuclear power plant design teams and by utility personnel involved in specification and design review. The guide was developed under EPRI research project RP2166-4 and is currently being published

  8. Tramp ship routing and scheduling with integrated bunker optimization

    DEFF Research Database (Denmark)

    Vilhelmsen, Charlotte; Lusby, Richard Martin; Larsen, Jesper

    2014-01-01

    is referred to as bunker and bunker costs constitute a significant part of the daily operating costs. There can be great variations in bunker prices across bunker ports so it is important to carefully plan bunkering for each ship. As ships operate 24 hours a day, they must refuel during operations. Therefore...... and scheduling phase and present a mixed integer programming formulation for the integrated problem of optimally routing, scheduling and bunkering a tramp fleet. Aside from the integration of bunker, this model also extends standard tramp formulations by using load dependent costs, speed and bunker consumption...

  9. A Review On Job Shop Scheduling Using Non-Conventional Optimization Algorithm

    OpenAIRE

    K.Mallikarjuna; Venkatesh.G

    2014-01-01

    A great deal of research has been focused on solving job shop scheduling problem (∫J), over the last four decades, resulting in a wide variety of approaches. Recently much effort has been concentrated on hybrid methods to solve ∫J, as a single technique cannot solve this stubborn problem. As a result much effort has recently been concentrated on techniques that lead to combinatorial optimization methods and a meta-strategy which guides the search out of local optima. In this p...

  10. User's guide for LTGSTD24 program, Version 2. 4

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, R.L.; Connell, L.M.

    1993-05-01

    On January 30, 1989, the US Department of Energy (DOE) promulgated an interim rule entitled [open quotes]Energy Conservation Voluntary Performance Standards for New Commercial and Multi-Family High Rise Residential Buildings; Mandatory for New Federal Buildings[close quotes] (10 CFR Part 435, Subpart A). These standards require federal agencies to design all future federal commercial and multifamily high-rise residential buildings in accordance with the standards, or demonstrate that their current requirements already meet or exceed the energy-efficiency requirements of the standards. Although these newly enacted standards do not regulate the design of non-federal buildings, the DOE recommends that all design professionals use the standards as guidelines for designing energy-conserving buildings. To encourage private sector use, the DOE published the standards in the January 30, 1989, Federal Register in the format typical of commercial standards. The Pacific Northwest Laboratory developed several computer programs for the DOE to make it easier for designers to comply with the standards. One of the programs, LTGSTD24 (Version 2.4), is detailed in this user's guide and is provided on the accompanying diskettes. The program will facilitate the designer's use of the standards dealing specifically with building lighting design. Using this program will greatly simplify the designer's task of performing the calculations needed to determine if a design complies with the standards.

  11. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  12. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  13. Predicting Cost and Schedule Growth for Military and Civil Space Systems

    National Research Council Canada - National Science Library

    Rusnock, Christina F

    2008-01-01

    ... for predicting cost and schedule growth. The analysis consists of logistic and multiple regression to assess 21 Department of Defense and 71 National Aeronautics and Space Administration (NASA) space programs...

  14. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  15. Suggested Curriculum Guide for Developing a Program in Appliance Service and Repair. Bulletin No. 48-174.

    Science.gov (United States)

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    The outline curriculum guide has been developed to assist in planning, developing, and instructing a program in appliance service and repair. The material consists of a unit outline and suggested exercieses and assignments for 17 areas: shop mathematics, communication skills, safety, orientation to appliance service and repair, blueprint reading,…

  16. Wetland Plant Guide for Assessing Habitat Impacts of Real-Time Salinity Management

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, Nigel W.T.; Feldmann, Sara A.

    2004-10-15

    This wetland plant guide was developed to aid moist soil plant identification and to assist in the mapping of waterfowl and shorebird habitat in the Grassland Water District and surrounding wetland areas. The motivation for this habitat mapping project was a concern that real-time salinity management of wetland drainage might have long-term consequences for wildfowl habitat health--changes in wetland drawdown schedules might, over the long term, lead to increased soil salinity and other conditions unfavorable to propagation of the most desirable moist soil plants. Hence, the implementation of a program to monitor annual changes in the most common moist soil plants might serve as an index of habitat health and sustainability. Our review of the current scientific and popular literature failed to identify a good, comprehensive field guide that could be used to calibrate and verify high resolution remote sensing imagery, that we had started to use to develop maps of wetland moist soil plants in the Grassland Water District. Since completing the guide it has been used to conduct ground truthing field surveys using the California Native Plant Society methodology in 2004. Results of this survey and a previous wetland plant survey in 2003 are published in a companion LBNL publication summarizing 4 years of fieldwork to advance the science of real-time wetland salinity management.

  17. A Constraint Logic Programming Framework for the Synthesis of Fault-Tolerant Schedules for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    -execution for recovering from multiple transient faults. We propose three scheduling approaches, which each present a trade-off between schedule simplicity and performance, (i) full transparency, (ii) slack sharing and (iii) conditional, and provide various degrees of transparency. We have developed a CLP framework...

  18. Feasibility of computerized scheduled gradual reduction for adolescent smoking cessation.

    Science.gov (United States)

    Riley, William; Jerome, Albert; Behar, Albert; Zack, Sharon

    2002-01-01

    The purpose of this project was to modify a smoking cessation program that uses computerized scheduled gradual reduction for use with adolescent smokers and to test the feasibility of this cessation approach in group support and minimal contact modalities. Utilizing a lesson plan approach with high school marketing students in five high schools and student survey feedback, the LifeSign program was modified to be an acceptable smoking cessation program for adolescent smokers. In the first study, 17 adolescent smokers used the modified program with seven associated weekly group support sessions. At the end of treatment, 29% had quit smoking, and over half of those who continued to smoke reduced their smoking rate by 50%. In the second study, the LifeSign for Teens program was evaluated with 18 adolescent smokers in a minimal contact format. At the end of treatment, 17% had quit smoking, and mean smoking rate reductions of 43% were found among those who continued smoking. At 1-year follow-up, all subjects who had quit at posttreatment reported continuous abstinence. The results of these two small trials suggest that a computerized scheduled gradual reduction approach may be an accepted and potentially efficacious approach for smoking cessation among adolescent smokers.

  19. Generation-Side Power Scheduling in a Grid-Connected DC Microgrid

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Meng, Lexuan

    2015-01-01

    In this paper, a constrained mixed-integer programming model for scheduling the active power supplied by the generation units in storage-based DC microgrids is presented. The optimization problem minimizes operating costs taking into account a two-stage mode operation of the energy storage system...... so that a more accurate model for optimization of the microgrid operation can be obtained. The model is used in a particular grid-connected DC microgrid that includes two renewable energy sources and an energy storage system which supply a critical load. The results of the scheduling process...

  20. Japanese Language and Culture: 10-3Y, 20-3Y, 30-3Y. 3-Year Program Guide to Implementation

    Science.gov (United States)

    Alberta Education, 2009

    2009-01-01

    This guide to implementation is intended to support the Japanese Language and Culture 10-3Y, 20-3Y, 30-3Y Program of Studies. It was developed primarily for teachers, yet it includes information that may be useful for administrators and other stakeholders in their efforts to plan for and implement the new Japanese program of studies. Familiarity…

  1. A Simple Method for Dynamic Scheduling in a Heterogeneous Computing System

    OpenAIRE

    Žumer, Viljem; Brest, Janez

    2002-01-01

    A simple method for the dynamic scheduling on a heterogeneous computing system is proposed in this paper. It was implemented to minimize the parallel program execution time. The proposed method decomposes the program workload into computationally homogeneous subtasks, which may be of the different size, depending on the current load of each machine in a heterogeneous computing system.

  2. Using System Architecture, Review Entry Criteria, and Standard Work Package Data to Enable Rapid Development of Integrated Master Schedules

    Science.gov (United States)

    2016-03-01

    critical path, EVM, project management, systems engineering, CVN, obsolescence , integrated master schedule , portfolio schedule 15. NUMBER OF PAGES...after the decision to swap deployments between the CVN-69 and CVN-75. C. COTS OBSOLESCENCE While CVN deadlines impose schedule constraints...Elements The context diagram shows how a CVN IT program SEP and IMS interact with COTS obsolescence , the CPA availability schedule , and other internal

  3. 32 CFR 2400.15 - Classification guides.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TO IMPLEMENT E.O. 12356; OFFICE OF SCIENCE AND TECHNOLOGY POLICY INFORMATION SECURITY PROGRAM Derivative Classification § 2400.15 Classification guides. (a) OSTP shall issue and maintain classification guides to facilitate the proper and uniform derivative classification of information. These guides shall...

  4. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    Science.gov (United States)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  5. Hydrothermal self-scheduling problem in a day-ahead electricity market

    International Nuclear Information System (INIS)

    Bisanovic, Smajo; Dlakic, Muris; Hajro, Mensur

    2008-01-01

    This paper addresses the self-scheduling problem of determining the unit commitment status for power generation companies before submitting the hourly bids in a day-ahead market. The hydrothermal model is formulated as a deterministic optimization problem where expected profit is maximized using the 0/1 mixed-integer linear programming technique. This approach allows precise modelling of non-convex variable cost functions and non-linear start-up cost functions of thermal units, non-concave power-discharge characteristics of hydro units, ramp rate limits of thermal units and minimum up and down time constraints for both hydro and thermal units. Model incorporates long-term bilateral contracts with contracted power and price patterns, as well as forecasted market hourly prices for day-ahead auction. Solution is achieved using the homogeneous interior point method for linear programming as state of the art technique, with a branch and bound optimizer for integer programming. The effectiveness of the proposed model in optimizing the generation schedule is demonstrated through the case studies and their analysis. (author)

  6. Applied Research of Enterprise Cost Control Based on Linear Programming

    Directory of Open Access Journals (Sweden)

    Yu Shuo

    2015-01-01

    This paper researches the enterprise cost control through the linear programming model, and analyzes the restriction factors of the labor of enterprise production, raw materials, processing equipment, sales price, and other factors affecting the enterprise income, so as to obtain an enterprise cost control model based on the linear programming. This model can calculate rational production mode in the case of limited resources, and acquire optimal enterprise income. The production guiding program and scheduling arrangement of the enterprise can be obtained through calculation results, so as to provide scientific and effective guidance for the enterprise production. This paper adds the sensitivity analysis in the linear programming model, so as to learn about the stability of the enterprise cost control model based on linear programming through the sensitivity analysis, and verify the rationality of the model, and indicate the direction for the enterprise cost control. The calculation results of the model can provide a certain reference for the enterprise planning in the market economy environment, which have strong reference and practical significance in terms of the enterprise cost control.

  7. Combustion of hydrogen-air jets in local chemical equilibrium: A guide to the CHARNAL computer program

    Science.gov (United States)

    Spalding, D. B.; Launder, B. E.; Morse, A. P.; Maples, G.

    1974-01-01

    A guide to a computer program, written in FORTRAN 4, for predicting the flow properties of turbulent mixing with combustion of a circular jet of hydrogen into a co-flowing stream of air is presented. The program, which is based upon the Imperial College group's PASSA series, solves differential equations for diffusion and dissipation of turbulent kinetic energy and also of the R.M.S. fluctuation of hydrogen concentration. The effective turbulent viscosity for use in the shear stress equation is computed. Chemical equilibrium is assumed throughout the flow.

  8. Are behaviors at one alternative in concurrent schedules independent of contingencies at the other alternative?

    Science.gov (United States)

    MacDonall, James S

    2017-09-01

    Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.

  9. Scheduling Aircraft Landings under Constrained Position Shifting

    Science.gov (United States)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  10. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  11. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  12. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  13. An corrigendum on the paper : Solving the job-shop scheduling problem optimally by dynamic programming (Computers and Operations Research 39(12) (2968–2977) (S0305054812000500) (10.1016/j.cor.2012.02.024))

    NARCIS (Netherlands)

    van Hoorn, Jelke J.; Nogueira, Agustín; Ojea, Ignacio; Gromicho Dos Santos, Joaquim Antonio

    2017-01-01

    In [1] an algorithm is proposed for solving the job-shop scheduling problem optimally using a dynamic programming strategy. This is, according to our knowledge, the first exact algorithm for the Job Shop problem which is not based on integer linear programming and branch and bound. Despite the

  14. Scaling Non-Regular Shared-Memory Codes by Reusing Custom Loop Schedules

    Directory of Open Access Journals (Sweden)

    Dimitrios S. Nikolopoulos

    2003-01-01

    Full Text Available In this paper we explore the idea of customizing and reusing loop schedules to improve the scalability of non-regular numerical codes in shared-memory architectures with non-uniform memory access latency. The main objective is to implicitly setup affinity links between threads and data, by devising loop schedules that achieve balanced work distribution within irregular data spaces and reusing them as much as possible along the execution of the program for better memory access locality. This transformation provides a great deal of flexibility in optimizing locality, without compromising the simplicity of the shared-memory programming paradigm. In particular, the programmer does not need to explicitly distribute data between processors. The paper presents practical examples from real applications and experiments showing the efficiency of the approach.

  15. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  16. Using diffusion of innovations theory to guide diabetes management program development: an illustrative example.

    Science.gov (United States)

    De Civita, Mirella; Dasgupta, Kaberi

    2007-09-01

    Optimal management of type 2 diabetes requires achievement of optimal glucose, blood pressure and lipid targets through promotion of prudent diet, regular physical activity and adherence to necessary medication. This may require the development of new programs for the coordination of required multidisciplinary services. Diffusion of innovations theory offers a conceptual framework that may facilitate the implementation of such programs. To illustrate this, we have re-examined the implementation experiences previously reported by the developers of an actual diabetes management pilot program in Montreal, with an eye toward identifying potentially important process factors that could effectively increase adoption and sustainability. Physician participation in the program appeared to be influenced by perceived advantages of participation, compatibility of the program with own perspective and perceived barriers to participation. Organizational features that may have influenced participation included the extent of the program's integration within the existing health care system. A thorough consideration of process factors that impact system and team integration must equally include a focus on ensuring ongoing partnerships among the producers of the model, governments, nongovernmental organizations, private industry, user professionals and patients. This can only be achieved when a knowledge transfer action plan is developed to guide program development, implementation and sustainability.

  17. [A telemetrically-guided program for weight reduction in overweight subjects (the SMART study)].

    Science.gov (United States)

    Körtke, H; Frisch, S; Zittermann, A; Berthold, H K; El-Arousy, M; Götting, C; Kleesiek, K; Stehle, P; Körfer, R

    2008-06-01

    Compliance with weight reducing programs can be improved by intensive care and control. We tested a telemetrically-guided weight reduction program in overweight and obese persons. 200 outpatients (62 males) with a mean body mass index of 34 kg/m (2) and a mean age of 47 years participated in a prospective study for one year. During the first six months, telemetrical support (weight-transmission via Bluetooth (short range)-technology, 20-minutes telephone consultation with a nutritionist) was given weekly. After six months, participants were randomly assigned either to a group with further telemonitoring support (telemetric group) or to a group without contact to our clinic (control group). At baseline, and after six and twelve months, body weight, body composition (bioelectrical impedance analysis), and parameters of the metabolic syndrome were assessed at our clinic. 16 participants terminated the study prematurely during the first 6 months and 19 participants (10 from the telemetric group and 9 from the control group) during the second 6 months. According to the intention-to-treat principle, mean weight loss was 6.7 kg (p < 0,001), mean loss of body fat was 5.1 kg (p < 0,001), and mean loss of fat-free mass was 1.6 kg (p < 0,001) within the first six months. Moreover, metabolic and cardiovascular risk markers such as waist circumference, blood pressure, serum triglycerides and blood glucose declined significantly (p < 0,001). Prevalence of the metabolic syndrome fell from 49.5% to 42.0 % (p < 0,05). During the second six months body fat content, waist circumference, and blood glucose increased again in the control group but not in the telemetric group (p < 0,05-0,001). The telemetrically-guided weight loss program was a more efficacious measure than the less intensive support without telemonitoring.

  18. 40 CFR 256.27 - Recommendation for schedules leading to compliance with the prohibition of open dumping.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Recommendation for schedules leading to compliance with the prohibition of open dumping. 256.27 Section 256.27 Protection of Environment... SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.27 Recommendation for schedules leading...

  19. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  20. Stochastic profit-based scheduling of industrial virtual power plant using the best demand response strategy

    International Nuclear Information System (INIS)

    Nosratabadi, Seyyed Mostafa; Hooshmand, Rahmat-Allah; Gholipour, Eskandar

    2016-01-01

    Highlights: • VPPs and IVPPs are defined for energy management of aggregated generations. • IVPP can manage industrial microgrid containing some relevant load and generation. • A stochastic modeling is proposed to schedule optimal generations in competition market. • Wind generation and day-ahead and spot market prices are considered to be stochastic. • A new DRL program selection scheme is presented in the scheduling procedure. - Abstract: One of the main classified microgrids in a power system is the industrial microgrid. Due to its behaviors and the heavy loads, its energy management is challengeable. Virtual Power Plant (VPP) can be an important concept in managing such problems in this kind of grids. Here, a transmission power system is considered as a Regional Electric Company (REC) and the VPPs comprising Distributed Generation (DG) units and Demand Response Loads (DRLs) are determined in this system. This paper focuses on Industrial VPP (IVPP) and its management. An IVPP can be determined as a management unit comprising generations and loads in an industrial microgrid. Since the scheduling procedure for these units is very important for their participation in a short-term electric market, a stochastic formulation is proposed for power scheduling in VPPs especially in IVPPs in this paper. By introducing the DRL programs and using the proposed modeling, the operator can select the best DRL program for each VPP in a scheduling procedure. In this regard, a suitable approach is presented to determine the proposed formulation and its solution in a Mixed Integer Non-Linear Programming (MINLP). To validate the performance of the proposed method, the IEEE Reliability Test System (IEEE-RTS) is considered to apply the method on it, while some challenging aspects are presented.

  1. Schoolwide Programs: Parents' Guide & Capacity-Building Materials = Programas Schoolwide: Una Guia para Padres y Materias de Capacitacion.

    Science.gov (United States)

    WestEd, San Francisco, CA.

    The reauthorization of Title I (Improving America's Schools Act--IASA) made the Schoolwide Program (Schoolwide) a major strategy for schools with high poverty rates and stressed the importance of parent involvement. This guide was developed to provide professional development and parent education on Schoolwide implementation in California. The…

  2. Solving Flexible Job-Shop Scheduling Problem Using Gravitational Search Algorithm and Colored Petri Net

    Directory of Open Access Journals (Sweden)

    Behnam Barzegar

    2012-01-01

    Full Text Available Scheduled production system leads to avoiding stock accumulations, losses reduction, decreasing or even eliminating idol machines, and effort to better benefitting from machines for on time responding customer orders and supplying requested materials in suitable time. In flexible job-shop scheduling production systems, we could reduce time and costs by transferring and delivering operations on existing machines, that is, among NP-hard problems. The scheduling objective minimizes the maximal completion time of all the operations, which is denoted by Makespan. Different methods and algorithms have been presented for solving this problem. Having a reasonable scheduled production system has significant influence on improving effectiveness and attaining to organization goals. In this paper, new algorithm were proposed for flexible job-shop scheduling problem systems (FJSSP-GSPN that is based on gravitational search algorithm (GSA. In the proposed method, the flexible job-shop scheduling problem systems was modeled by color Petri net and CPN tool and then a scheduled job was programmed by GSA algorithm. The experimental results showed that the proposed method has reasonable performance in comparison with other algorithms.

  3. Optimal residential smart appliances scheduling considering distribution network constraints

    Directory of Open Access Journals (Sweden)

    Yu-Ree Kim

    2016-01-01

    Full Text Available As smart appliances (SAs are more widely adopted within distribution networks, residential consumers can contribute to electricity market operations with demand response resources and reduce their electricity bill. However, if the schedules of demand response resources are determined only by the economic electricity rate signal, the schedule can be unfeasible due to the distribution network constraints. Furthermore, it is impossible for consumers to understand the complex physical characteristics and reflect them in their everyday behaviors. This paper introduces the concept of load coordinating retailer (LCR that deals with demand responsive appliances to reduce electrical consumption for the given distribution network constraints. The LCR can play the role of both conventional retailer and aggregated demand response provider for residential customers. It determines the optimal schedules for the aggregated neighboring SAs according to their types within each distribution feeder. The optimization algorithms are developed using Mixed Integer Linear Programming, and the distribution network is solved by the Newton–Raphson AC power flow.

  4. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

    Directory of Open Access Journals (Sweden)

    Jianhong Hao

    2015-01-01

    Full Text Available We consider the nonstandard parts supply chain with a public service platform for machinery integration in China. The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner. Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers. Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline. We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative. According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.

  5. Risk Leading Indicators for DOD Acquisition Programs

    Science.gov (United States)

    2014-08-12

    Accomplishment 2: Preliminary Design Analysis. Criteria: Completed (a) design failure modes and effects analysis (DFMEA), (b) Fault Tree Analysis ( FTA ...Accomplishment 3, completed (a) updated DFMEA, (b) updated FTA , (c) updated reliability and maintainability estimates, (d) reliability growth plan and curve...Guide and Scheduling Guide (draft). GAO. Mar 2013. http://www.aacei-ncs.org/gaohq-6188401-v1- presentation_to_aace_mar-2013.pdf [5] Gary Bliss

  6. 32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control... OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory and review schedule (Report Control Symbol DD-P&L(A)). (a) Information in each DoD Component's...

  7. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    Science.gov (United States)

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  9. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  10. Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

    International Nuclear Information System (INIS)

    Fotouhi Ghazvini, Mohammad Ali; Canizes, Bruno; Vale, Zita; Morais, Hugo

    2013-01-01

    Highlights: ► Decision making under uncertainty. ► Stochastic Mixed Integer Quadratic Programming applied to short-term maintenance scheduling. ► Outage scheduling in Oligopolistic electricity markets. ► Generation companies maintenance scheduling. -- Abstract: In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

  11. Guide to good practices for on-the-job training. DOE guideline

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    The purpose of the Department of Energy (DOE) Guide to Good Practices for On-the-Job Training (OJT) is to provide DOE contractor organizations with information that can be used to modify existing programs or to develop new programs. This guide replaces the Guide to Good Practices for On-the-Job Training that was distributed to DOE and DOE contractors in 1987. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they can use the information in this guide to develop programs that apply to their facility. This guide can be used as an aid in the design and development of a facility`s OJT programs and to assist the instructors who conduct OJT and performance tests in the areas of facility operations, maintenance, and technical supports.

  12. DOE program guide for universities and other research groups. Part I. DOE Research and Development Programs; Part II. DOE Procurement and Assistance Policies/Procedures

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    This guide addresses the DOE responsibility for fostering advanced research and development of all energy resources, both current and potential. It is intended to provide, in a single publication, all the fundamental information needed by an institution to develop a potential working relationship with DOE. Part I describes DOE research and development programs and facilities, and identifies areas of additional research needs and potential areas for new research opportunities. It also summarizes budget data and identifies the DOE program information contacts for each program. Part II provides researchers and research administrators with an introduction to the DOE administrative policies and procedures for submission and evaluation of proposals and the administration of resulting grants, cooperative agreements, and research contracts. (RWR)

  13. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  14. Comparison of two kiln-drying schedules for turkish hazel ( Corylus colurna ) lumber of 5-cm thickness

    OpenAIRE

    Korkut, Süleyman; As, Nusret; Büyüksari, Ümit

    2018-01-01

    Abstract: Turkish hazel (Corylus colurna) lumber with a nominal thickness of 5 cm from the Kastamonu region, Turkey, was dried through conventional kiln drying using two different programs, a non-protective drying schedule and a protective drying schedule. The goal of the study was to obtain a kiln schedule that would maintain wood quality and also save drying time until a final moisture content of 8 ± 2% was reached. The intensity of warping (twisting, bowing, cupping, crooking), superficial...

  15. Variable Neighborhood Search for Parallel Machines Scheduling Problem with Step Deteriorating Jobs

    Directory of Open Access Journals (Sweden)

    Wenming Cheng

    2012-01-01

    Full Text Available In many real scheduling environments, a job processed later needs longer time than the same job when it starts earlier. This phenomenon is known as scheduling with deteriorating jobs to many industrial applications. In this paper, we study a scheduling problem of minimizing the total completion time on identical parallel machines where the processing time of a job is a step function of its starting time and a deteriorating date that is individual to all jobs. Firstly, a mixed integer programming model is presented for the problem. And then, a modified weight-combination search algorithm and a variable neighborhood search are employed to yield optimal or near-optimal schedule. To evaluate the performance of the proposed algorithms, computational experiments are performed on randomly generated test instances. Finally, computational results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time even for large-sized problems.

  16. 78 FR 48722 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2013-08-09

    ... instructions on what happens to records when no longer needed for current Government business. They authorize... after the agency no longer needs them to conduct its business. Some schedules are comprehensive and... temporary items). Records related to agency-wide succession management planning programs, including...

  17. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  18. Price schedules coordination for electricity pool markets

    Science.gov (United States)

    Legbedji, Alexis Motto

    2002-04-01

    We consider the optimal coordination of a class of mathematical programs with equilibrium constraints, which is formally interpreted as a resource-allocation problem. Many decomposition techniques were proposed to circumvent the difficulty of solving large systems with limited computer resources. The considerable improvement in computer architecture has allowed the solution of large-scale problems with increasing speed. Consequently, interest in decomposition techniques has waned. Nonetheless, there is an important class of applications for which decomposition techniques will still be relevant, among others, distributed systems---the Internet, perhaps, being the most conspicuous example---and competitive economic systems. Conceptually, a competitive economic system is a collection of agents that have similar or different objectives while sharing the same system resources. In theory, constructing a large-scale mathematical program and solving it centrally, using currently available computing power can optimize such systems of agents. In practice, however, because agents are self-interested and not willing to reveal some sensitive corporate data, one cannot solve these kinds of coordination problems by simply maximizing the sum of agent's objective functions with respect to their constraints. An iterative price decomposition or Lagrangian dual method is considered best suited because it can operate with limited information. A price-directed strategy, however, can only work successfully when coordinating or equilibrium prices exist, which is not generally the case when a weak duality is unavoidable. Showing when such prices exist and how to compute them is the main subject of this thesis. Among our results, we show that, if the Lagrangian function of a primal program is additively separable, price schedules coordination may be attained. The prices are Lagrange multipliers, and are also the decision variables of a dual program. In addition, we propose a new form of

  19. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  20. How To Select an Event Management System: A Guide to Selecting the Most Effective Resource Management System for College Union and Student Activities Professionals.

    Science.gov (United States)

    Anderson, Scott; Raasch, Kevin

    2002-01-01

    Provides an evaluation template for student activities professionals charged with evaluating competitive event scheduling software. Guides staff in making an informed decision on whether to retain event management technology provided through an existing vendor or choose "best-of-breed" scheduling software. (EV)

  1. Interface between the production plan and the master production schedule in assembly environments

    OpenAIRE

    Moya Navarro, Marcos; Sánchez Brenes, Magaly

    2012-01-01

    In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environmen...

  2. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  3. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  4. GUIDE 7. A general program for evaluating the properties of scintillation and Cerenkov counter optical systems

    International Nuclear Information System (INIS)

    Massam, T.

    1976-01-01

    GUIDE 7 is a design tool for optical systems which are constructed predominantly from reflecting surfaces. A wide range of surface forms and qualities may be chosen and there is provision for the user to extend the range of applicability of the program. Available facilities include estimation of light collection efficiencies, simulation of the space-time intensity distributions of photons arriving at a detector, optimization of the parameters of focusing systems. The report gives a complete description of the program, including user-defined routines. A large-area time-of-flight counter and ray-tracing for a parabolic mirror are treated as examples, detailing the input data and showing the corresponding output. The derivation of the vector algorithms used in the program is also included. (Auth.)

  5. Implementation of a hepatitis A/B vaccination program using an accelerated schedule among high-risk inmates, Los Angeles County Jail, 2007-2010.

    Science.gov (United States)

    Costumbrado, John; Stirland, Ali; Cox, Garrett; El-Amin, Alvin Nelson; Miranda, Armidia; Carter, Ann; Malek, Mark

    2012-11-06

    The Centers for Disease Control and Prevention recommend vaccination for men who have sex with men (MSM) and injection drug users against hepatitis A and B. This study is the first report of a hepatitis vaccination program in a United States jail with a combined vaccine using an accelerated schedule. Los Angeles County has the largest jail system in the nation and Men's Central Jail (MCJ) is the largest facility within that system. MCJ includes a unit for self-identified MSM, where approximately 2700 inmates are housed per year. Starting in August 2007, a combined hepatitis A and B vaccine was offered to all inmates housed in this special unit. Using an accelerated schedule (0-, 7-, 21-30 days, 12-month booster), a total of 3931 doses were administered to 1633 inmates as of June 2010. Of those, 77% received 2 doses, 58% received 3 doses, and 11% received the booster dose. Inmates who screened positive for a sexually transmitted infection in this unit were 1.3 times more likely to be vaccinated (95% CI 1.2-1.4) compared to others in the same housing unit who screened negative. Hepatitis vaccination initiatives can be successfully implemented in an urban jail among an extremely high-risk population using the accelerated, combined hepatitis A/B vaccine. Ours may be a useful model for other programs to vaccinate incarcerated populations. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. Creation of University Wellness Program Healthy Eating and Active Lifestyle Supports: A Knowledge-to-Action Process.

    Science.gov (United States)

    Joy, Phillip; Mann, Linda; Blotnicky, Karen

    2018-03-01

    With the burdens that preventable health conditions place on individuals, workplaces, and society, workplace wellness programs (WWP) are critical to ensuring employees have access to health promotion supports tailored to their work environments. Such programs are best guided by a knowledge-to-action (KTA) framework; a theoretically grounded, systematic process that considers the ongoing exchange of knowledge with employees to engage them in health behaviour change and to garner employers' support for the interventions. Therefore the purpose of this project was to develop, implement, and evaluate WWP healthy eating and active lifestyle supports at a university. A KTA process guided the consultations with employees and stakeholders that led to the development and implementation of a range of resource effective supports and the incorporation of wellness in the organization culture. A key support was the Wellness Passport that encouraged participation in scheduled WWP activities, as well as allowing for self-identified ones. Quality assurance assessments demonstrated a desire for a continuation of these WWP supports and activities. Dietitians, as health promotion leaders, can play key roles in the emerging field of WWPs. University dietetic and internship programs should consider adding WWP and KTA training components.

  7. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  8. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  9. Security guide for subcontractors

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.C.

    1993-06-01

    This guide is provided to aid in the achievement of security objectives in the Department of Energy (DOE) contractor/subcontractor program. The objectives of security are to protect information that, if released, would endanger the common defense and security of the nation and to safeguard plants and installations of the DOE and its contractors to prevent the interruption of research and production programs. The security objective and means of achieving the objective are described. Specific security measures discussed in this guide include physical barriers, personnel identification systems, personnel and vehicular access control, classified document control, protection of classified matter in use, storing classified matter, and repository combinations. Means of dealing with security violations and security infractions are described. Maintenance of a security education program is discussed. Also discussed are methods of handling clearance terminations, visitor control, travel to sensitive countries, and shipment security. The Technical Surveillance Countermeasures Program (TSCM), the Computer Security Program, and the Operations Security Plan (OPSEC) are examined.

  10. Hospitality Services. Curriculum Guide.

    Science.gov (United States)

    Texas Tech Univ., Lubbock. Home Economics Curriculum Center.

    This guide, which was developed as part of Texas' home economics education program, is intended to assist teachers of a hospitality services course focusing on the food and lodging segments of the hospitality and tourism industry. The first 40% of the approximately 600-page guide consists of strategies for teaching each of 29 essential…

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  12. Resource-Optimal Scheduling Using Priced Timed Automata

    DEFF Research Database (Denmark)

    Larsen, Kim Guldstrand; Rasmussen, Jacob Illum; Subramani, K.

    2004-01-01

    In this paper, we show how the simple structure of the linear programs encountered during symbolic minimum-cost reachability analysis of priced timed automata can be exploited in order to substantially improve the performance of the current algorithm. The idea is rooted in duality of linear......-80 percent performance gain. As a main application area, we show how to solve energy-optimal task graph scheduling problems using the framework of priced timed automata....

  13. Providing frequency regulation reserve services using demand response scheduling

    International Nuclear Information System (INIS)

    Motalleb, Mahdi; Thornton, Matsu; Reihani, Ehsan; Ghorbani, Reza

    2016-01-01

    Highlights: • Proposing a market model for contingency reserve services using demand response. • Considering transient limitations of grid frequency for inverter-based generations. • Price-sensitive scheduling of residential batteries and water heaters using dynamic programming. • Calculating the profits of both generation companies and demand response aggregators. - Abstract: During power grid contingencies, frequency regulation is a primary concern. Historically, frequency regulation during contingency events has been the sole responsibility of the power utility. We present a practical method of using distributed demand response scheduling to provide frequency regulation during contingency events. This paper discusses the implementation of a control system model for the use of distributed energy storage systems such as battery banks and electric water heaters as a source of ancillary services. We present an algorithm which handles the optimization of demand response scheduling for normal operation and during contingency events. We use dynamic programming as an optimization tool. A price signal is developed using optimal power flow calculations to determine the locational marginal price of electricity, while sensor data for water usage is also collected. Using these inputs to dynamic programming, the optimal control signals are given as output. We assume a market model in which distributed demand response resources are sold as a commodity on the open market and profits from demand response aggregators as brokers of distributed demand response resources can be calculated. In considering control decisions for regulation of transient changes in frequency, we focus on IEEE standard 1547 in order to prevent the safety shut-off of inverter-based generation and further exacerbation of frequency droop. This method is applied to IEEE case 118 as a demonstration of the method in practice.

  14. A neural network approach to job-shop scheduling.

    Science.gov (United States)

    Zhou, D N; Cherkassky, V; Baldwin, T R; Olson, D E

    1991-01-01

    A novel analog computational network is presented for solving NP-complete constraint satisfaction problems, i.e. job-shop scheduling. In contrast to most neural approaches to combinatorial optimization based on quadratic energy cost function, the authors propose to use linear cost functions. As a result, the network complexity (number of neurons and the number of resistive interconnections) grows only linearly with problem size, and large-scale implementations become possible. The proposed approach is related to the linear programming network described by D.W. Tank and J.J. Hopfield (1985), which also uses a linear cost function for a simple optimization problem. It is shown how to map a difficult constraint-satisfaction problem onto a simple neural net in which the number of neural processors equals the number of subjobs (operations) and the number of interconnections grows linearly with the total number of operations. Simulations show that the authors' approach produces better solutions than existing neural approaches to job-shop scheduling, i.e. the traveling salesman problem-type Hopfield approach and integer linear programming approach of J.P.S. Foo and Y. Takefuji (1988), in terms of the quality of the solution and the network complexity.

  15. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  16. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  17. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  18. Coordinated scheduling for dynamic real-time systems

    Science.gov (United States)

    Natarajan, Swaminathan; Zhao, Wei

    1994-01-01

    In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

  19. Construction schedule management of China Experimental Fast Reactor

    International Nuclear Information System (INIS)

    Wang Yue

    2012-01-01

    China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)

  20. Fractionation schedules for cancers of the head and neck

    International Nuclear Information System (INIS)

    Harari, Paul M.

    1995-01-01

    Purpose/Objective: This refresher course reviews current research activity and treatment results in the field of radiation therapy fractionation. The presentation emphasizes worldwide studies of altered fractionation, highlighting head and neck cancer as the primary teaching model. Basic radiobiological principles guiding the development of altered fractionation regimens, and advancing the understanding of fractionation effects on normal and tumor tissue are reviewed. A 'standard' prescription of 2 Gy x 35 fractions = 70 Gy may not provide the optimal balance between primary tumor control and late normal tissue effects for all patients with squamous cell carcinoma of the head and neck. The last decade has witnessed the treatment of thousands of head and neck cancer patients with curative radiotherapy using altered fractination schedules designed to improve overall treatment results. Although the number of different fractionation regimens currently being investigated continues to increase, the common guiding principles behind their design are relatively simple. Common fractionation terminology (i.e., accelerated hyperfractionation) will be reviewed, as well as a brief summary of radiobiological concepts pertaining to tumor potential doubling time, tumor proliferation kinetics, overall treatment time and fraction size-dependence of acute and late tissue effects. Several well known head and neck fractionation schedules from around the world (Manchester Christie Hospital-United Kingdom, Princess Margaret Hospital-Canada, Massachusetts General Hospital-USA, MD Anderson Hospital-USA, University of Florida-USA, Mount Vernon Hospital CHART-United Kingdom, RTOG and EORTC trials-USA and Europe) will be summarized with regard to design-rationale, treatment technique and results. The design of several current cooperative group trials investigating altered head and neck fractionation will be presented, as well as concepts prompting the pilot evaluation of several brand new

  1. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  2. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    Science.gov (United States)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  3. Short term scheduling of multiple grid-parallel PEM fuel cells for microgrid applications

    Energy Technology Data Exchange (ETDEWEB)

    El-Sharkh, M.Y.; Rahman, A.; Alam, M.S. [Dept. of Electrical and Computer Engineering, University of South Alabama, Mobile, AL 36688 (United States)

    2010-10-15

    This paper presents a short term scheduling scheme for multiple grid-parallel PEM fuel cell power plants (FCPPs) connected to supply electrical and thermal energy to a microgrid community. As in the case of regular power plants, short term scheduling of FCPP is also a cost-based optimization problem that includes the cost of operation, thermal power recovery, and the power trade with the local utility grid. Due to the ability of the microgrid community to trade power with the local grid, the power balance constraint is not applicable, other constraints like the real power operating limits of the FCPP, and minimum up and down time are therefore used. To solve the short term scheduling problem of the FCPPs, a hybrid technique based on evolutionary programming (EP) and hill climbing technique (HC) is used. The EP is used to estimate the optimal schedule and the output power from each FCPP. The HC technique is used to monitor the feasibility of the solution during the search process. The short term scheduling problem is used to estimate the schedule and the electrical and thermal power output of five FCPPs supplying a maximum power of 300 kW. (author)

  4. ELABORATION OF A DRYING SCHEDULE FOR Eucalyptus spp HYBRIDS CLONES WOODS

    Directory of Open Access Journals (Sweden)

    Celso Gonçalves Barbosa

    2005-03-01

    Full Text Available The elaboration of adequate drying schedules is essential to produce high quality conventional kiln dried lumber.Eucalyptus woods are particularly difficult to dry, and, for this reason, it is desirable that the drying schedule be carefullydeveloped. The objectives of this work were to elaborate a drying schedule for woods of ten Eucalyptus hybrids clones and toverify the propensity of these woods to post drying defects. For this purpose, it was applied the methodology of drastic drying at100°C, which associates intensity of defects, time and rate of drying, presented by small wood samples, with the behaviourto be presented by lumber after the conventional drying. The results allowed developing a drying schedule common to the tenclone lumbers. This program is based on an initial temperature of 40°C, final temperature of 66°C and drying potential equal to2.2. The drying time can be reduced, if the clones were grouped in accordance to their drying rate. The clones presented lowpropensity to split and high propensity to collapse.

  5. Effects of scheduled exercise on cancer-related fatigue in women with early breast cancer

    OpenAIRE

    Husebø, Anne Marie Lunde; Dyrstad, Sindre Mikal; Mjaaland, Ingvil; Søreide, Jon Arne; Bru, Lars Edvin

    2014-01-01

    The article was originally published in The Scientific World Journal; by Hindawi Publishing Corporation under the Creative Commons Attribution License; see http://dx.doi.org/10.1155/2014/27182. While physical activity during cancer treatment is found beneficial for breast cancer patients, evidence indicates ambiguous findings concerning effects of scheduled exercise programs on treatment-related symptoms. This study investigated effects of a scheduled home-based exercise intervention i...

  6. VR system CompleXcope programming guide

    International Nuclear Information System (INIS)

    Kageyama, Akira; Sato, Tetsuya

    1998-09-01

    A CAVE virtual reality system CompleXcope is installed in Theory and Computer Center, National Institute for Fusion Science, for the purpose of the interactive analysis/visualization of 3-dimensional complex data of supercomputer simulations. This guide explains how to make a CompleXcope application with Open GL and CAVE library. (author)

  7. Program Guide for Diesel Engine Mechanics 8742000 (IN47.060500) and Heavy Duty Truck and Bus Mechanics DIM0991 (IN47.060501).

    Science.gov (United States)

    University of South Florida, Tampa. Coll. of Education.

    This competency-based program guide provides course content information and procedures for secondary schools, postsecondary vocational schools, and community colleges in Florida that conduct programs in diesel engine mechanics and heavy duty truck and bus mechanics. The first section is on legal authority, which applies to all vocational education…

  8. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  9. An Instructor's Guide for a Program in Brake Services.

    Science.gov (United States)

    New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.

    The instructor's guide is designed to present an understanding of the automotive hydraulic brake system and to help individuals develop new skills for employment in this specialized field of automotive service. Applicable for secondary or adult education, this guide describes: the brake system, types of brakes, diagnosis and correction of brake…

  10. Pocket companion to PMI's PMBOK guide

    CERN Document Server

    Snijders, Paul; Zandhuis, Anton

    2010-01-01

    This pocket guide is based on the PMBOK Guide® Fourth Edition.This pocket guide supplies a summary of the PMBOK Guide® , to provide a quick introduction as well as a structured overview of this method for project management.This pocket guide deals with the key issues and themes within project management and PMBOK:A short overview of the activities of PMI Inc., The organization and its standards: PMBOK Guide®, Standard for Project Portfolio Management, Standard for Program Management, OPM3.The essentials of the Project Lifecycle and Organization.What are the key project management knowledge ar

  11. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    Science.gov (United States)

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  12. Scheduling language and algorithm development study. Appendix: Study approach and activity summary

    Science.gov (United States)

    1974-01-01

    The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

  13. A genetic algorithm-based job scheduling model for big data analytics.

    Science.gov (United States)

    Lu, Qinghua; Li, Shanshan; Zhang, Weishan; Zhang, Lei

    Big data analytics (BDA) applications are a new category of software applications that process large amounts of data using scalable parallel processing infrastructure to obtain hidden value. Hadoop is the most mature open-source big data analytics framework, which implements the MapReduce programming model to process big data with MapReduce jobs. Big data analytics jobs are often continuous and not mutually separated. The existing work mainly focuses on executing jobs in sequence, which are often inefficient and consume high energy. In this paper, we propose a genetic algorithm-based job scheduling model for big data analytics applications to improve the efficiency of big data analytics. To implement the job scheduling model, we leverage an estimation module to predict the performance of clusters when executing analytics jobs. We have evaluated the proposed job scheduling model in terms of feasibility and accuracy.

  14. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  15. Description of mathematical models and computer programs

    International Nuclear Information System (INIS)

    1977-01-01

    The paper gives a description of mathematical models and computer programs for analysing possible strategies for spent fuel management, with emphasis on economic analysis. The computer programs developed, describe the material flows, facility construction schedules, capital investment schedules and operating costs for the facilities used in managing the spent fuel. The computer programs use a combination of simulation and optimization procedures for the economic analyses. Many of the fuel cycle steps (such as spent fuel discharges, storage at the reactor, and transport to the RFCC) are described in physical and economic terms through simulation modeling, while others (such as reprocessing plant size and commissioning schedules, interim storage facility commissioning schedules etc.) are subjected to economic optimization procedures to determine the approximate lowest-cost plans from among the available feasible alternatives

  16. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  17. The scheduling of tracking times for interplanetary spacecraft on the Deep Space Network

    Science.gov (United States)

    Webb, W. A.

    1978-01-01

    The Deep Space Network (DSN) is a network of tracking stations, located throughout the globe, used to track spacecraft for NASA's interplanetary missions. This paper describes a computer program, DSNTRAK, which provides an optimum daily tracking schedule for the DSN given the view periods at each station for a mission set of n spacecraft, where n is between 2 and 6. The objective function is specified in terms of relative total daily tracking time requirements between the n spacecraft. Linear programming is used to maximize the total daily tracking time and determine an optimal daily tracking schedule consistent with DSN station capabilities. DSNTRAK is used as part of a procedure to provide DSN load forecasting information for proposed future NASA mission sets.

  18. MMS trims proposed schedule for OCS oil and gas lease sales

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the U.S. Interior Department has proposed only 18 Outer Continental Shelf oil and gas lease sales in its new 5 year schedule. Eleven of the sales are in the Gulf of Mexico, one off the east Coast, none off the West Coast, and six off Alaska. Congress has 60 days in which to reject the 5 year lease sale plan but is not expected to. An earlier draft plan called for 23 sales. The Minerals Management Service, which administers the offshore leasing program, the the new schedule emphasizes leasing of gas prone areas

  19. A Two-Level Task Scheduler on Multiple DSP System for OpenCL

    Directory of Open Access Journals (Sweden)

    Li Tian

    2014-04-01

    Full Text Available This paper addresses the problem that multiple DSP system does not support OpenCL programming. With the compiler, runtime, and the kernel scheduler proposed, an OpenCL application becomes portable not only between multiple CPU and GPU, but also between embedded multiple DSP systems. Firstly, the LLVM compiler was imported for source-to-source translation in which the translated source was supported by CCS. Secondly, two-level schedulers were proposed to support efficient OpenCL kernel execution. The DSP/BIOS is used to schedule system level tasks such as interrupts and drivers; however, the synchronization mechanism resulted in heavy overhead during task switching. So we designed an efficient second level scheduler especially for OpenCL kernel work-item scheduling. The context switch process utilizes the 8 functional units and cross path links which was superior to DSP/BIOS in the aspect of task switching. Finally, dynamic loading and software managed CACHE were redesigned for OpenCL running on multiple DSP system. We evaluated the performance using some common OpenCL kernels from NVIDIA, AMD, NAS, and Parboil benchmarks. Experimental results show that the DSP OpenCL can efficiently exploit the computing resource of multiple cores.

  20. Dynamic scheduling and analysis of real time systems with multiprocessors

    Directory of Open Access Journals (Sweden)

    M.D. Nashid Anjum

    2016-08-01

    Full Text Available This research work considers a scenario of cloud computing job-shop scheduling problems. We consider m realtime jobs with various lengths and n machines with different computational speeds and costs. Each job has a deadline to be met, and the profit of processing a packet of a job differs from other jobs. Moreover, considered deadlines are either hard or soft and a penalty is applied if a deadline is missed where the penalty is considered as an exponential function of time. The scheduling problem has been formulated as a mixed integer non-linear programming problem whose objective is to maximize net-profit. The formulated problem is computationally hard and not solvable in deterministic polynomial time. This research work proposes an algorithm named the Tube-tap algorithm as a solution to this scheduling optimization problem. Extensive simulation shows that the proposed algorithm outperforms existing solutions in terms of maximizing net-profit and preserving deadlines.

  1. Programs to increase high school completion: a community guide systematic health equity review.

    Science.gov (United States)

    Hahn, Robert A; Knopf, John A; Wilson, Sandra Jo; Truman, Benedict I; Milstein, Bobby; Johnson, Robert L; Fielding, Jonathan E; Muntaner, Carles J M; Jones, Camara Phyllis; Fullilove, Mindy T; Moss, Regina Davis; Ueffing, Erin; Hunt, Pete C

    2015-05-01

    High school completion (HSC) is an established predictor of long-term morbidity and mortality. U.S. rates of HSC are substantially lower among students from low-income families and most racial/ethnic minority populations than students from high-income families and the non-Hispanic white population. This systematic review assesses the effectiveness of programs to increase HSC and the potential of these programs to improve lifelong health among at-risk students. A search located a meta-analysis (search period 1985-2010/2011) on the effects of programs to increase HSC or General Educational Development (GED) diploma receipt; the meta-analysis was concordant with Community Guide definitions and methodologic standards. Programs were assessed separately for the general student population (152 studies) and students who were parents or pregnant (15 studies). A search for studies published between 2010 and August 2012 located ten more recent studies, which were assessed for consistency with the meta-analysis. Analyses were conducted in 2013. The review focused on the meta-analysis. Program effectiveness was measured as the increased rate of HSC (or GED receipt) by the intervention group compared with controls. All assessed program types were effective in increasing HSC in the general student population: vocational training, alternative schooling, social-emotional skills training, college-oriented programming, mentoring and counseling, supplemental academic services, school and class restructuring, multiservice packages, attendance monitoring and contingencies, community service, and case management. For students who had children or were pregnant, attendance monitoring and multiservice packages were effective. Ten studies published after the search period for the meta-analysis were consistent with its findings. There is strong evidence that a variety of HSC programs can improve high school or GED completion rates. Because many programs are targeted to high-risk students and

  2. Water requirement and irrigation schedule for tomato in northern guinea savanna zone, Nigeria

    Directory of Open Access Journals (Sweden)

    Ibraheem Alhassan

    2015-06-01

    Full Text Available Assessment of water requirement and irrigation schedule for tomato with the support of FAO-CROPWAT simulation model was carried out for Yola, Nigeria with the aim of planning irrigation schedules for tomato and develop recommendations for improve irrigation practices. The climatic data for 2012/2013 and soil properties of the study area were input into the program. Tomato crop properties were updated by the FAO data and three irrigation intervals were tested (7 and 10 days irrigation intervals and irrigation schedule of 10 days interval during initial and development stage and 6 days interval at mid and late season stages of tomato crop. The simulated results analysis for tomato according to the irrigation schedule showed that highest yield reduction of 16.2% was recorded with 10 days irrigation interval treatment and the least of 0.4% with irrigation interval of 10 days at first two growth stages and 6 days at last two stages. FAO-CROPWAT 8.0 can be used in planning proper irrigation schedule for tomato in Yola, Nigeria.

  3. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  4. User's guide to the western spruce budworm modeling system

    Science.gov (United States)

    Nicholas L. Crookston; J. J. Colbert; Paul W. Thomas; Katharine A. Sheehan; William P. Kemp

    1990-01-01

    The Budworm Modeling System is a set of four computer programs: The Budworm Dynamics Model, the Prognosis-Budworm Dynamics Model, the Prognosis-Budworm Damage Model, and the Parallel Processing-Budworm Dynamics Model. Input to the first three programs and the output produced are described in this guide. A guide to the fourth program will be published separately....

  5. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  6. SALOME. User's guide

    International Nuclear Information System (INIS)

    Zastrow, K.D.

    1994-01-01

    A user's guide for a least squares fit analysis program is presented, which has been developed for VUV and visible plasma spectroscopy on the Extrap-T1 experiment. The program can be used for line and multiplet identification, multiplet intensity and line width measurements. Atomic data are used extensively to aid the interpretation of the spectra. 7 figs

  7. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  8. Screening program for prostate cancer at a university hospital in eastern Saudi Arabia

    International Nuclear Information System (INIS)

    Taha, Saud A.; Kamal, Baher A.

    2005-01-01

    Implementation of a pilot screening program for prostate cancer among Saudi patients that would serve as a nucleus for a Kingdom-wide screening program. A prospective study on 1,213 Saudi males between 50-80 years of age who attended the Outpatient Department at King Fahd Hospital of King Faisal University, Al-Khobar, Kingdom of Saudi Arabia during a period of 18 months (April 2001-October 2002). They were included at random from different clinics including the urology clinic. Free and total prostate specific antigen (PSA) and digital rectal examination (DRE) of the prostate were performed in all patients. Patients with abnormal DRE or PSA were scheduled for transrectal ultrasound (TRUS) and ultrasound guided biopsy of the prostate. Abnormal DRE or PSA were present in 84 out of 1,213 patients. Only 63 patients agreed to have TRUS and ultrasound guided biopsies. Prostate cancer was confirmed in 14 out of 1,192 patients who completed the study (1.17%). The incidence of prostate cancer among Saudi men in this hospital based study is low. A population based screening for prostate cancer may reveal the incidence of this disease. (author)

  9. Energy-Aware Synthesis of Fault-Tolerant Schedules for Real-Time Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    This paper presents a design optimisation tool for distributed embedded real-time systems that 1) decides mapping, fault-tolerance policy and generates a fault-tolerant schedule, 2) is targeted for hard real-time, 3) has hard reliability goal, 4) generates static schedule for processes and messages......, 5) provides fault-tolerance for k transient/soft faults, 6) optimises for minimal energy consumption, while considering impact of lowering voltages on the probability of faults, 7) uses constraint logic programming (CLP) based implementation....

  10. Combined scheduling of electricity and heat in a microgrid with volatile wind power

    DEFF Research Database (Denmark)

    Xu, Lizhong; Yang, Guang Ya; Xu, Zhao

    2011-01-01

    An optimization model is developed for scheduling electricity and heat production in a microgrid under a day-ahead market environment considering the operation constraints and the volatility of wind power generation. The model optimizes the total operation costs from energy and heating consumption...... into a mixed-integer programming (MIP) problem. Numerical simulations present the efficacy of the proposed model for day-ahead scheduling of a microgrid with wind penetration under the deregulated environment. © 2011 State Grid Electrtic Resarch Institute Press....

  11. Neural nets for job-shop scheduling, will they do the job?

    NARCIS (Netherlands)

    Rooda, J.E.; Willems, T.M.; Goodwin, G.C.; Evans, R.J.

    1993-01-01

    A neural net structure has been developed which is capable of solving deterministic jobshop scheduling problems, part of the large class of np-complete problems. The problem was translated in an integer linear-programming format which facilitated translation in an adequate neural net structure. Use

  12. Production and Resource Scheduling in Mass Customization with Dependent Setup Consideration

    DEFF Research Database (Denmark)

    Nielsen, Izabela Ewa; Bocewicz, G.; Do, Ngoc Anh Dung

    2014-01-01

    will contribute to the success of mass customization. This paper addresses the problem of production and resource scheduling for a production system with dependent setup and internal transportation such as AGVs in a mass customization environment. A constraint-programming-based methodology is developed to satisfy...

  13. Raspberry Pi user guide

    CERN Document Server

    Halfacree, Gareth

    2012-01-01

    Make the most out of the world’s first truly compact computer It's the size of a credit card, it can be charged like a smartphone, it runs on open-source Linux, and it holds the promise of bringing programming and playing to millions at low cost. And now you can learn how to use this amazing computer from its co-creator, Eben Upton, in Raspberry Pi User Guide. Cowritten with Gareth Halfacree, this guide gets you up and running on Raspberry Pi, whether you're an educator, hacker, hobbyist, or kid. Learn how to connect your Pi to other hardware, install software, write basic programs, an

  14. Community Living Skills Guide: Art.

    Science.gov (United States)

    Sobol, Sheila; Kreps, Alice Roelofs

    One of twenty course guides in the Community Living Skills Guide for the College for Living series, this document provides guidelines and workbook activities for the course, Art. The series of courses for developmentally disabled adults is intended to supplement residential programs and to aid in orienting institutionalized persons to eventual…

  15. 41 CFR 101-26.503 - Multiple award schedule purchases made by GSA supply distribution facilities.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Multiple award schedule... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.503...

  16. Urban energy management: a course on the administration of public energy programs. An instructor's guide

    Energy Technology Data Exchange (ETDEWEB)

    Mandelbaum, Dr., Len; Olsen, Dr., Marvin; Hyman, Dr., Barry; Sheridan, Mimi; Dahlberg, Judy; O' Brien, Jeremy

    1980-12-01

    The course provides local government administrators, staff, and students with the background knowledge to deal with a broad range of energy management concerns and is not to train technical energy conservation specialists. Section II contains the Instructor's Guide and Section III provides the Student Outlines and Handouts on the following subjects: The Energy Problem; National Energy Politics and Programs; State and Local Energy Programs; Techniques of Energy Planning; Techniques of Energy Conservation; Techniques of Renewable Energy Production; Strategies for Voluntary Energy Management; Strategies for Finan. Energy Management; and Strategies for Mandatory Energy Management. (MCW)

  17. Liferay Beginner's Guide

    CERN Document Server

    Chen, Robert; Bhatt, Samir

    2011-01-01

    Part of Packt's Beginner's Guide series, each chapter follows the creation of a fictional neighbourhood site to demonstrate an aspect of Liferay portal with practical examples, screenshots, and step-by-step instructions. All you need in order to benefit from the Liferay Beginner's Guide is programming experience. No prior knowledge of Liferay is required, although experienced Liferay portal programmers who need to get up to speed with its latest features will also find this book useful.

  18. Teacher's Guide to SERAPHIM Software V. Chemistry: The Central Science.

    Science.gov (United States)

    Bogner, Donna J.

    Designed to assist chemistry teachers in selecting appropriate software programs, this publication is the fifth in a series of six teacher's guides from Project SERAPHIM, a program sponsored by the National Science Foundation. This guide is keyed to the chapters of the text "Chemistry: The Central Science." Program suggestions are…

  19. A Tropical Ecology Field Program in Central America.

    Science.gov (United States)

    Fisher, Ronald L., Jr.; McLaren, J. Philip

    1989-01-01

    Described is a field trip for high school and college students to the country of Belize to study tropical ecology. Discussed are planning and special considerations. Included are a sample schedule and a planning guide. (CW)

  20. Discrete Optimization Model for Vehicle Routing Problem with Scheduling Side Cosntraints

    Science.gov (United States)

    Juliandri, Dedy; Mawengkang, Herman; Bu'ulolo, F.

    2018-01-01

    Vehicle Routing Problem (VRP) is an important element of many logistic systems which involve routing and scheduling of vehicles from a depot to a set of customers node. This is a hard combinatorial optimization problem with the objective to find an optimal set of routes used by a fleet of vehicles to serve the demands a set of customers It is required that these vehicles return to the depot after serving customers’ demand. The problem incorporates time windows, fleet and driver scheduling, pick-up and delivery in the planning horizon. The goal is to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the overall costs of all routes over the planning horizon. We model the problem as a linear mixed integer program. We develop a combination of heuristics and exact method for solving the model.