WorldWideScience

Sample records for program control operations

  1. Effluent controls and environmental monitoring programs for uranium milling operations

    International Nuclear Information System (INIS)

    Maixner, R.D.

    1979-01-01

    Controls will reduce gaseous, particulate, and liquid discharges. Monitoring programs are used to determine effectiveness. The controls and programs discussed are used at Cotter Corporation's Canon City Mill in Colorado. 3 refs

  2. Programming a real-time operating system for satellite control applications Satellite Control Applications

    International Nuclear Information System (INIS)

    Omer, M.; Anjum, O.; Suddle, M.R.

    2004-01-01

    With the realization of ideas like formation flights and multi-body space vehicles the demands on an attitude control system have become increasingly complex. Even in its most simplified form, the control system for a typical geostationary satellite has to run various supervisory functions along with determination and control algorithms side by side. Within each algorithm it has to employ multiple actuation and sensing mechanisms and service real time interrupts, for example, in the case of actuator saturation and sensor data fusion. This entails the idea of thread scheduling and program synchronization, tasks specifically meant for a real time OS. This paper explores the embedding of attitude determination and control loop within the framework of a real time operating system provided for TI's DSP C6xxx series. The paper details out the much functionality provided within the scaleable real time kernel and the analysis and configuration tools available, It goes on to describe a layered implementation stack associated with a typical control for Geo Stationary satellites. An application for control is then presented in which state of the art analysis tools are employed to view program threads, synchronization semaphores, hardware interrupts and data exchange pipes operating in real time. (author)

  3. The quality control program for an Ontario Hydro operated thermoluminescence dosimetry service at nuclear generating stations

    International Nuclear Information System (INIS)

    Orr, B.H.; Walsh, M.L.

    1975-11-01

    An essential aspect of the Ontario Hydro TLD service is the operation of an acceptable quality control (QC) program. The QC program which has been generally accepted by the A.E.C.B. is presented in this document. The aims of the program are as follows: (1) to ensure that Ontario Hydro maintains an acceptable standard of dosimetry; (2) to be able to demonstrate to any interested party that the dose measurements for individual workers have a high degree of credibility. (author)

  4. Operator programs and operator processes

    NARCIS (Netherlands)

    Bergstra, J.A.; Walters, P.

    2003-01-01

    We define a notion of program which is not a computer program but an operator program: a detailed description of actions performed and decisions taken by a human operator (computer user) performing a task to achieve a goal in a simple setting consisting of that user, one or more computers and a

  5. Installation of PMV Operation Program in DDC Controller and Air Conditioning Control Using PMV Directly as Set Point

    Science.gov (United States)

    Haramoto, Ken-Ichi

    In general, air conditioning control in a building is operated mainly by indoor air temperature control. Although the operators of the machine in the building accepted a claim for indoor air temperature presented by the building inhabitants, the indoor conditions have been often too cool or warm. Therefore, in an attempt to create better thermal environments, the author paid attention to the PMV that is a thermal comfort index. And then, the possibility of air conditioning control using the PMV directly as the set point was verified by employing actual equipment in an air conditioning testing room and an office building. Prior to the execution of this control, the operation program of the PMV was installed in a DDC controller for the air conditioning control. And information from indoor sensors and so on was inputted to the controller, and the computed PMV was used as the feedback variable.

  6. D0 HVAC System Heat Pump Controller Programming, Networking, and Operating Information

    International Nuclear Information System (INIS)

    Anderson, B.

    1999-01-01

    The purpose of this engineering note is to provide the necessary information to setup, program, and network the Electronic Systems USA Heat Pump Controller with the LON network card and Intellution Fix32 to operate properly within the HVAC system at D-Zero. The heat pump controllers are used for local temperature control of the office environments on the fifth and six floors of D-Zero. Heat pump units 1-6 are located in the ceiling of the sixth floor. Heat pump units 7-12 are found in the fifth floor ceiling. Heat pump unit 13 is in the Southeast corner of the fifth floor. Prior to installation the heat pump controller must be properly prepared to operate correctly in the HVAC system. Each heat pump unit must contain firmware (software) version 1.31 to operate properly on the network. Controllers with version 1.30 will not be able to communicate over the LON network. The manufacturer can only update the firmware version. Before installation a series of heat pump setpoints must be manually set using the Intelligent Stat. Connect the Intelligent Stat via the serial cable or wired connection.

  7. Mission Control Operations: Employing a New High Performance Design for Communications Links Supporting Exploration Programs

    Science.gov (United States)

    Jackson, Dan E., Jr.

    2015-01-01

    The planetary exploration programs demand a totally new examination of data multiplexing, digital communications protocols and data transmission principles for both ground and spacecraft operations. Highly adaptive communications devices on-board and on the ground must provide the greatest possible transmitted data density between deployed crew personnel, spacecraft and ground control teams. Regarding these requirements, this proposal borrows from research into quantum mechanical computing by applying the concept of a qubit, a single bit that represents 16 states, to radio frequency (RF) communications link design for exploration programs. This concept of placing multiple character values into a single data bit can easily make the evolutionary steps needed to meet exploration mission demands. To move the qubit from the quantum mechanical research laboratory into long distance RF data transmission, this proposal utilizes polarization modulation of the RF carrier signal to represent numbers from zero to fifteen. It introduces the concept of a binary-to-hexadecimal converter that quickly chops any data stream into 16-bit words and connects variously polarized feedhorns to a single-frequency radio transmitter. Further, the concept relies on development of a receiver that uses low-noise amplifiers and an antenna array to quickly assess carrier polarity and perform hexadecimal to binary conversion. Early testbed experiments using the International Space Station (ISS) as an operations laboratory can be implemented to provide the most cost-effective return for research investment. The improvement in signal-to-noise ratio while supporting greater baseband data rates that could be achieved through this concept justifies its consideration for long-distance exploration programs.

  8. High level programming for the control of a tele operating mobile robot and with line following

    International Nuclear Information System (INIS)

    Bernal U, E.

    2006-01-01

    The TRASMAR automated vehicle was built with the purpose of transporting radioactive materials, it has a similar kinematic structure to that of a tricycle, in where the front wheel is the one in charge of offering the traction and direction, both rear wheels rotate freely and they are subject to a common axle. The electronic design was carried out being based on a MC68HC811 micro controller of the Motorola company. Of the characteristics that the robot possesses it stands out that it counts with an obstacle perception system through three ultrasonic sensors located in the front part of the vehicle to avoid collisions. The robot has two operation modes, the main mode is the manual, manipulated through a control by infrareds, although it can also move in autonomous way by means of the line pursuit technique using two reflective infrared sensors. As any other electronic system, the mobile robot required of improvements and upgrades. The modifications to be carried out were focused to the control stage. Its were intended as elements of upgrade the incorporation of the MC68HC912B32 micro controller and to replace the assembler language characteristic of this type of systems, by a high level language for micro controllers of this type, in this case the FORTH. In a same way it was implemented inside the program the function of the robot's displacement in an autonomous way by means of the line pursuit technique using control with fuzzy logic. The carried out work is distributed in the following way: In the chapter 1 the robot's characteristics are mentioned, as well as the objectives that thought about to the beginning of the project and the justifications that motivated the realization of this upgrade. In the chapters 2 at 5 are presented in a theoretical way the supports used for the the robot's upgrade, as the used modules of the micro controller, those main characteristics of the FORTH language, the theory of the fuzzy logic and the design of the stage of power that

  9. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2004-10-01

    PG&E NEG Salem Harbor Station Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of mercury control at Salem Harbor Unit 1, including performance, estimated cost, and operation data. This unit has very high native mercury removal, thus it was important to understand the impacts of process variables on native mercury capture. The team responsible for executing this program included plant and PG&E headquarters personnel, EPRI and several of its member companies, DOE, ADA, Norit Americas, Inc., Hamon Research-Cottrell, Apogee Scientific, TRC Environmental Corporation, Reaction Engineering, as well as other laboratories. The technical support of all of these entities came together to make this program achieve its goals. Overall the objectives of this field test program were to determine the mercury control and balance-of-plant impacts resulting from activated carbon injection into a full-scale ESP on Salem Harbor Unit 1, a low sulfur bituminous-coal-fired 86 MW unit. It was also important to understand the impacts of process variables on native mercury removal (>85%). One half of the gas stream was used for these tests, or 43 MWe. Activated carbon, DARCO FGD supplied by NORIT Americas, was injected upstream of the cold side ESP, just downstream of the air preheater. This allowed for approximately 1.5 seconds residence time in the duct before entering the ESP. Conditions tested in this field evaluation included the impacts of the Selective Non-Catalytic Reduction (SNCR) system on mercury capture, of unburned carbon in the fly ash, of adjusting ESP inlet flue gas temperatures, and of boiler load on mercury control. The field evaluation conducted at Salem Harbor looked at several sorbent injection concentrations at several flue gas temperatures. It was noted that at the mid temperature range of 322-327 F, the LOI (unburned carbon) lost some of its

  10. A flexible simulation program for multitasking operating systems to investigate controllers in thermal solar systems

    Energy Technology Data Exchange (ETDEWEB)

    Wittwer, C.; Horlitz, O.; Rommel, M. [Fraunhofer Inst. for Solar Energy Systems ISE, Freiburg (Germany)

    1996-12-31

    This paper describes a new program CoISim to simulate systems with complex controllers which is based on a principle similar to the wide-spread modular program TRNSYS. To get an accurate response of this dynamic system, small time are used steps. A numerical integration algorithm is used which is especially suitable for solving a system of nonlinear equations. With time steps of 1 second, it is possible to observe the dynamic effect of ``matched flow systems`` where the flow is a continous function of the state. An important motivation for the development of this dynamic simulation model is the validation of system models. This will be possible by comparing simulations with real measurement data having different time steps. One of the main aims is to determine the dependence of the heat transfer in the collector and the heat exchanger and the flow speed of the fluid. The energy demand of the pump is greatly influenced very much by this dependency. The mass flow controller can be a simple ``two-position controller`` or, as well, a complex ``fuzzy controller``. To describe the fuzzy controller, a separate, commercially available development program may be used. The controller is usually implemented in ANSI-C. (orig.)

  11. Operator interface programs for KSTAR operation

    International Nuclear Information System (INIS)

    Lee, Sangil; Park, Mikyung; Park, Jinseop; Na, Hoonkyun; Kwon, M.

    2013-01-01

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system

  12. Operator interface programs for KSTAR operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sangil, E-mail: leesi@nfri.re.kr; Park, Mikyung, E-mail: mkpark@nfri.re.kr; Park, Jinseop, E-mail: linupark@nfri.re.kr; Na, Hoonkyun, E-mail: hkna@nfri.re.kr; Kwon, M., E-mail: kwonm@nfri.re.kr

    2013-11-15

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system.

  13. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2005-03-17

    Brayton Point Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of the impacts of future mercury regulations to Brayton Point Unit 1, including performance, estimated cost, and operation data. This unit has variable (29-75%) native mercury removal, thus it was important to understand the impacts of process variables and activated carbon on mercury capture. The team responsible for executing this program included: (1) Plant and PG&E National Energy Group corporate personnel; (2) Electric Power Research Institute (EPRI); (3) United States Department of Energy National Energy Technology Laboratory (DOE/NETL); (4) ADA-ES, Inc.; (5) NORIT Americas, Inc.; (6) Apogee Scientific, Inc.; (7) TRC Environmental Corporation; (8) URS Corporation; (9) Quinapoxet Solutions; (10) Energy and Environmental Strategies (EES); and (11) Reaction Engineering International (REI). The technical support of all of these entities came together to make this program achieve its goals. Overall, the objectives of this field test program were to determine the impact of activated carbon injection on mercury control and balance-of-plant processes on Brayton Point Unit 1. Brayton Point Unit 1 is a 250-MW unit that fires a low-sulfur eastern bituminous coal. Particulate control is achieved by two electrostatic precipitators (ESPs) in series. The full-scale tests were conducted on one-half of the flue gas stream (nominally 125 MW). Mercury control sorbents were injected in between the two ESPs. The residence time from the injection grid to the second ESP was approximately 0.5 seconds. In preparation for the full-scale tests, 12 different sorbents were evaluated in a slipstream of flue gas via a packed-bed field test apparatus for mercury adsorption. Results from these tests were used to determine the five carbon-based sorbents that were tested at full-scale. Conditions of interest

  14. Safety control of nuclear power operations using self-programming neural networks

    International Nuclear Information System (INIS)

    Jouse, W.C.; Williams, J.G.

    1993-01-01

    In the design and operation of nuclear reactors, safety-related goals must be embedded in complex multivariate control strategies. It is often the case that the goals exist only as mental models in the mind of the designer or the operator. In order to effect control that is risk averse, the goals must be translated into an effective control strategy that can be both verified and validated. The relation that these safety goals have to a particular architecture of artificial neural network, the Barto-Sutton architecture, is examined and the capability of the network to embed safety goals in nontrivial control tasks is demonstrated. To realize these goals, the network was extended to encompass a multiple-input/multiple-output control structure. The network synthesizes a control schedule through the construction of artificial precursors to failure; these serve as an additional, virtual layer in the defenses against fission product release. The synthesized schedule can be visually inspected for anomalies and inconsistencies and is validated during training

  15. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  16. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2003-05-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000--2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES has developed a portable system that will be tested at four different utility power plants. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as activated carbon, which removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG&E National Energy Group is providing two test sites that fire bituminous coals and both are equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB) coal and

  17. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  18. State Energy Program Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Office of Building Technology, State and Community Programs

    1999-03-17

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  19. Implementation of a program to recover the Atomic Energy Control Board's operating costs

    International Nuclear Information System (INIS)

    1989-01-01

    The Canadian Atomic Energy Control Board (AECB) has undertaken a preliminary study to examine the feasibility of recovering the costs of its regulatory activities in accordance with the Canadian federal government user-pay principle. This study has found that recovery of the AECB's entire budget of $25 million per year would not have a significant financial impact on its licensees. The AECB has prepared regulations and a fee schedule and carried out consultations with the nuclear industry and the public to determine the potential financial and economic impacts of this initiative

  20. A Proficiency Based Stepwise Endovascular Curricular Training (PROSPECT) Program Enhances Operative Performance in Real Life: A Randomised Controlled Trial.

    Science.gov (United States)

    Maertens, H; Aggarwal, R; Moreels, N; Vermassen, F; Van Herzeele, I

    2017-09-01

    Healthcare evolution requires optimisation of surgical training to provide safe patient care. Operating room performance after completion of proficiency based training in vascular surgery has not been investigated. A randomised controlled trial evaluated the impact of a Proficiency based Stepwise Endovascular Curricular Training program (PROSPECT) on the acquisition of endovascular skills and the transferability of these skills to real life interventions. All subjects performed two endovascular interventions treating patients with symptomatic iliac and/or superficial femoral artery stenosis under supervision. Primary outcomes were technical performances (Global Rating Scale [GRS]; Examiner Checklist), operative metrics, and patient outcomes, adjusted for case difficulty and trainee experience. Secondary outcomes included knowledge and technical performance after 6 weeks and 3 months. Thirty-two general surgical trainees were randomised into three groups. Besides traditional training, the first group (n = 11) received e-learning and simulation training (PROSPECT), the second group (n = 10) only had access to e-learning, while controls (n = 11) did not receive supplementary training. Twenty-nine trainees (3 dropouts) performed 58 procedures. Trainees who completed PROSPECT showed superior technical performance (GRS 39.36 ± 2.05; Checklist 63.51 ± 3.18) in real life with significantly fewer supervisor takeovers compared with trainees receiving e-learning alone (GRS 28.42 ± 2.15; p = .001; Checklist 53.63 ± 3.34; p = .027) or traditional education (GRS 23.09 ± 2.18; p = .001; Checklist 38.72 ± 3.38; p = .001). Supervisors felt more confident in allowing PROSPECT trained physicians to perform basic (p = .006) and complex (p = .003) procedures. No differences were detected in procedural parameters (such as fluoroscopy time, DAP, procedure time, etc.) or complications. Proficiency levels were maintained up to 3 months. A structured

  1. LOFT Augmented Operator Capability Program

    International Nuclear Information System (INIS)

    Hollenbeck, D.A.; Krantz, E.A.; Hunt, G.L.; Meyer, O.R.

    1980-01-01

    The outline of the LOFT Augmented Operator Capability Program is presented. This program utilizes the LOFT (Loss-of-Fluid Test) reactor facility which is located at the Idaho National Engineering Laboratory and the LOFT operational transient experiment series as a test bed for methods of enhancing the reactor operator's capability for safer operation. The design of an Operational Diagnotics and Display System is presented which was backfit to the existing data acquisition computers. Basic color-graphic displays of the process schematic and trend type are presented. In addition, displays were developed and are presented which represent safety state vector information. A task analysis method was applied to LOFT reactor operating procedures to test its usefulness in defining the operator's information needs and workload

  2. Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Boring; Roger Lew; Thomas Ulrich; Jeffrey Joe

    2014-03-01

    As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how the process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.

  3. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  4. AEC controlled area safety program

    International Nuclear Information System (INIS)

    Hendricks, D.W.

    1969-01-01

    The detonation of underground nuclear explosives and the subsequent data recovery efforts require a comprehensive pre- and post-detonation safety program for workers within the controlled area. The general personnel monitoring and environmental surveillance program at the Nevada Test Site are presented. Some of the more unusual health-physics aspects involved in the operation of this program are also discussed. The application of experience gained at the Nevada Test Site is illustrated by description of the on-site operational and safety programs established for Project Gasbuggy. (author)

  5. AEC controlled area safety program

    Energy Technology Data Exchange (ETDEWEB)

    Hendricks, D W [Nevada Operations Office, Atomic Energy Commission, Las Vegas, NV (United States)

    1969-07-01

    The detonation of underground nuclear explosives and the subsequent data recovery efforts require a comprehensive pre- and post-detonation safety program for workers within the controlled area. The general personnel monitoring and environmental surveillance program at the Nevada Test Site are presented. Some of the more unusual health-physics aspects involved in the operation of this program are also discussed. The application of experience gained at the Nevada Test Site is illustrated by description of the on-site operational and safety programs established for Project Gasbuggy. (author)

  6. Impact of the Antibiotic Stewardship Program on Prevention and Control of Surgical Site Infection during Peri-Operative Clean Surgery.

    Science.gov (United States)

    Liu, Juyuan; Li, Na; Hao, Jinjuan; Li, Yanming; Liu, Anlei; Wu, Yinghong; Cai, Meng

    2018-04-01

    Surgical site infections (SSIs) are the leading cause of hospital-acquired infections and are associated with substantial healthcare costs, with increased morbidity and mortality. To investigate the effects of the antibiotic stewardship program on prevention and control of SSI during clean surgery, we investigated this situation in our institution. We performed a quasi-experimental study to compare the effect before and after the antibiotic stewardship program intervention. During the pre-intervention stage (January 1, 2010 through December 31, 2011), comprehensive surveillance was performed to determine the SSI baseline data. In the second stage (January 1, 2012 through December 31, 2016), an infectious diseases physician and an infection control practitioner identified the surgical patients daily and followed up on the duration of antimicrobial prophylaxis. From January 1, 2010 to December 31, 2016, 41,426 patients underwent clean surgeries in a grade III, class A hospital. The rate of prophylactic antibiotic use in the 41,426 clean surgeries was reduced from 82.9% to 28.0% after the interventions. The rate of antibiotic agents administered within 120 minutes of the first incision increased from 20.8% to 85.1%. The rate at which prophylactic antimicrobial agents were discontinued in the first 24 hours after surgery increased from 22.1% to 60.4%. Appropriate antibiotic selection increased from 37.0% to 93.6%. Prophylactic antibiotic re-dosing increased from 3.8% to 64.8%. The SSI rate decreased from 0.7% to 0.5% (p < 0.05). The pathogen detection rate increased from 16.7% up to 41.8% after intervention. The intensity of antibiotic consumption reduced from 74.9 defined daily doses (DDDs) per 100 bed-days to 34.2 DDDs per 100 bed-days after the interventions. Long-term and continuous antibiotic stewardship programs have important effects on the prevention and control of SSI during clean surgery.

  7. A noise-reduction program in a pediatric operation theatre is associated with surgeon's benefits and a reduced rate of complications: a prospective controlled clinical trial.

    Science.gov (United States)

    Engelmann, Carsten R; Neis, Jan Philipp; Kirschbaum, Clemens; Grote, Gudela; Ure, Benno M

    2014-05-01

    We assessed the impact of a noise-reduction program in a pediatric operating theatre. Adverse effects from noise pollution in theatres have been demonstrated. In 156 operations spatially resolved, sound levels were measured before and after a noise-reduction program on the basis of education, rules, and technical devices (Sound Ear). Surgical complications were recorded. The surgeon's biometric (saliva cortisol, electrodermal activity) and behavioral stress responses (questionnaires) were measured and correlated with mission protocols and individual noise sensitivity. Median noise levels in the control group versus the interventional group were reduced by -3 ± 3 dB(A) (63 vs 59 dB(A), P 0.05). Spontaneous noise during pediatric operations attains the magnitude of a lawn mower and peaks resemble a passing truck. The sound intensity could be reduced by 50% by specific measures. This reduction was associated with a significantly lowered number of postoperative complications. The surgeon's benefits are idiosyncratic with "responders" experiencing marked improvements.

  8. Process control program development

    International Nuclear Information System (INIS)

    Dameron, H.J.

    1985-01-01

    This paper details the development and implementation of a ''Process Control Program'' at Duke Power's three nuclear stations - Oconee, McGuire, and Catawba. Each station is required by Technical Specification to have a ''Process Control Program'' (PCP) to control all dewatering and/or solidification activities for radioactive wastes

  9. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  10. Advanced Transport Operating Systems Program

    Science.gov (United States)

    White, John J.

    1990-01-01

    NASA-Langley's Advanced Transport Operating Systems Program employs a heavily instrumented, B 737-100 as its Transport Systems Research Vehicle (TRSV). The TRSV has been used during the demonstration trials of the Time Reference Scanning Beam Microwave Landing System (TRSB MLS), the '4D flight-management' concept, ATC data links, and airborne windshear sensors. The credibility obtainable from successful flight test experiments is often a critical factor in the granting of substantial commitments for commercial implementation by the FAA and industry. In the case of the TRSB MLS, flight test demonstrations were decisive to its selection as the standard landing system by the ICAO.

  11. Perspective on BVDV control programs.

    Science.gov (United States)

    Givens, M Daniel; Newcomer, Benjamin W

    2015-06-01

    Programs for control and eradication of bovine viral diarrhea virus (BVDV) are often considered prudent when the expense of a control program within a specified time frame effectively prevents loss due to disease and the expense of control does not exceed the costs associated with infection. In some geographic areas, concerns about animal welfare or desires to reduce antibiotic usage may motivate BVDV control even when control programs are associated with a lack of financial return on investment. In other geographic areas, concerns about financial return on investment may be the key motivating factor in considering implementation of BVDV control programs. Past experiences indicate that systematic, well-coordinated control programs have a clear potential for success, while voluntary control programs in cultures of distributed decision-making often result in notable initial progress that ultimately ends in dissolution of efforts. Segmentation of the cattle industry into cow-calf producers, stocker/backgrounders, and feedlot operators amplifies the distribution of decision-making regarding control programs and may result in control measures for one industry segment that are associated with significant costs and limited rewards. Though the host range of BVDV extends well beyond cattle, multiple eradication programs that focus only on testing and removal of persistently infected (PI) cattle have proven to be effective in various countries. While some individuals consider education of producers to be sufficient to stimulate eradication of BVDV, research surrounding the adoption of innovative health care procedures suggests that the process of adopting BVDV control programs has a social element. Collegial interactions and discussions may be crucial in facilitating the systematic implementation necessary to optimize the long-term success of control programs. Compulsory control programs may be considered efficient and effective in some regions; however, in a nation where

  12. Toy Control Program evaluation.

    Science.gov (United States)

    Stewart, H A; Ormond, C; Seeger, B R

    1991-08-01

    The Toy Control Program for the Apple IIe microcomputer is a software and hardware package developed for the training of single-switch scanning skills. The specially designed scanning programs provide on screen visual feedback and activate a battery-powered toy to reinforce performance. This study examined whether the training of preschool subjects in single-switch scanning skills with the Toy Control Program would result in increased task completion scores and increased levels of attention to task, as compared with conditions of toy activation only and microcomputer programs with screen reinforcement only. The results showed that the subjects paid significantly more attention to the toys as reinforcers (p less than .01). No significant difference was found for the performance results of the three conditions. These findings support the use of a program like the Toy Control Program, which integrates the instructional capabilities of a computer with the reinforcement potential of a toy and the creativity of a therapist.

  13. EDS operator and control software

    International Nuclear Information System (INIS)

    Ott, L.L.

    1985-04-01

    The Enrichment Diagnostic System (EDS) was developed at Lawrence Livermore National Laboratory (LLNL) to acquire, display and analyze large quantities of transient data for a real-time Advanced Vapor Laser Isotope Separation (AVLIS) experiment. Major topics discussed in this paper are the EDS operator interface (SHELL) program, the data acquisition and analysis scheduling software, and the graphics software. The workstation concept used in EDS, the software used to configure a user's workstation, and the ownership and management of a diagnostic are described. An EDS diagnostic is a combination of hardware and software designed to study specific aspects of the process. Overall system performance is discussed from the standpoint of scheduling techniques, evaluation tools, optimization techniques, and program-to-program communication methods. EDS is based on a data driven design which keeps the need to modify software to a minimum. This design requires a fast and reliable data base management system. A third party data base management product, Berkeley Software System Database, written explicitly for HP1000's, is used for all EDS data bases. All graphics is done with an in-house graphics product, Device Independent Graphics Library (DIGLIB). Examples of devices supported by DIGLIB are: Versatec printer/plotters, Raster Technologies Graphic Display Controllers, and HP terminals (HP264x and HP262x). The benefits derived by using HP hardware and software as well as obstacles imposed by the HP environment are presented in relation to EDS development and implementation

  14. Cost of Operating Central Cancer Registries and Factors That Affect Cost: Findings From an Economic Evaluation of Centers for Disease Control and Prevention National Program of Cancer Registries.

    Science.gov (United States)

    Tangka, Florence K L; Subramanian, Sujha; Beebe, Maggie Cole; Weir, Hannah K; Trebino, Diana; Babcock, Frances; Ewing, Jean

    2016-01-01

    The Centers for Disease Control and Prevention (CDC) evaluated the economics of the National Program of Cancer Registries to provide the CDC, the registries, and policy makers with the economics evidence-base to make optimal decisions about resource allocation. Cancer registry budgets are under increasing threat, and, therefore, systematic assessment of the cost will identify approaches to improve the efficiencies of this vital data collection operation and also justify the funding required to sustain registry operations. To estimate the cost of cancer registry operations and to assess the factors affecting the cost per case reported by National Program of Cancer Registries-funded central cancer registries. We developed a Web-based cost assessment tool to collect 3 years of data (2009-2011) from each National Program of Cancer Registries-funded registry for all actual expenditures for registry activities (including those funded by other sources) and factors affecting registry operations. We used a random-effects regression model to estimate the impact of various factors on cost per cancer case reported. The cost of reporting a cancer case varied across the registries. Central cancer registries that receive high-quality data from reporting sources (as measured by the percentage of records passing automatic edits) and electronic data submissions, and those that collect and report on a large volume of cases had significantly lower cost per case. The volume of cases reported had a large effect, with low-volume registries experiencing much higher cost per case than medium- or high-volume registries. Our results suggest that registries operate with substantial fixed or semivariable costs. Therefore, sharing fixed costs among low-volume contiguous state registries, whenever possible, and centralization of certain processes can result in economies of scale. Approaches to improve quality of data submitted and increasing electronic reporting can also reduce cost.

  15. MPC and A operational monitoring system pilot project at MEPhI as example of successful application in the international/national control and guaranties programs

    International Nuclear Information System (INIS)

    Ryzhukhin, D.V.; Bondarev, P.V.; Pogozhin, N.S.

    2002-01-01

    Full text: At present an active development of digital communication technologies has resulted in reduction of their cost and increase of their possibilities. As a result the remote monitoring systems gain new development. The increase of the requirements to a safety level on potentially dangerous and very important objects makes such systems extremely attractive for using in a system of national departmental or international control and inspections. Purpose of using such systems is to provide control for correctness of subject to the control-regulated procedures performance, performance of management or inspection bodies' instructions and operating of existing protection systems, at integration with them. This control is independent from object staff. The remote monitoring systems usage by supervising bodies at an object gives following advantages: timely reception of information; increase of information volume at the expense of constant non physically presence of an onsite inspector; increase of received information objectivity at the expense of the fact of 'undeclared inspections' realization; an opportunity of application modern information technologies for analysis and storage of digital information; reduction of impact on object's work; reduction of volume of physical inspections and expenses for their realization. All above was reflected in the material protect, control and accounting (MPC and A) operational monitoring (MOM) program, begun under Russian-American cooperation in the field of MPC and A in 2001. MOM program purpose is to control double application materials and radioactive divided materials, activity of the people under MPC and A program and procedures ensuring performance of guarantees on special nuclear material (SNM) protection and non-proliferation. The Moscow engineering-physics institute (state university) (MEPhl) was chosen as an object of realization of MOM system pilot project. The reasons are that MEPhl is installed under framework of

  16. Auditing measurement control programs

    International Nuclear Information System (INIS)

    Roberts, F.P.; Brouns, R.J.

    1979-10-01

    Requirements and a general procedure for auditing measurement control programs used in special nuclear material accounting are discussed. The areas of measurement control that need to be examined are discussed and a suggested checklist is included to assist in the preparation and performance of the audit

  17. Measurement control program

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A measurement control program for the model plant is described. The discussion includes the technical basis for such a program, the application of measurement control principles to each measurement, and the use of special experiments to estimate measurement error parameters for difficult-to-measure materials. The discussion also describes the statistical aspects of the program, and the documentation procedures used to record, maintain, and process the basic data. The purpose of the session is to enable participants to: (1) understand the criteria for this type of a measurement control program; (2) understand the kinds of physical standards required for the various measurement processes, e.g., weighing, analytical, NDA; (3) understand the need for and importance of a measurement control program; (4) understand the need for special experiments to provide an improved basis for the measurement of difficult-to-measure materials; (5) understand the general scope of the program's statistical aspects; and (6) understand the basis and scope of the documentation procedures

  18. The operation of the GANIL control system

    International Nuclear Information System (INIS)

    Prome, M.; David, L.; Lecorche, E.

    1984-06-01

    When the first GANIL beams were obtained the control system was operating in an elementary way; the system behaved almost like a huge multiplexer. Now a large number of programs have been written; they allow to take benefit of the full power of the computers; they help the operators for starting, tuning and monitoring the accelerator. The paper gives a general description of these programs which are executed on the central computer: it shows how the accelerator is controlled either directly or via dedicated microprocessors. Informations are also given on the alarm system

  19. Program Baseline Change Control Board charter

    International Nuclear Information System (INIS)

    1993-02-01

    The purpose of this Charter is to establish the Program Baseline Change Control Board (PBCCB) for the Office of Civilian Radioactive Waste Management (OCRWM) Program, and to describe its organization, responsibilities, and basic methods of operation. Guidance for implementing this Charter is provided by the OCRWM Baseline Management Plan (BMP) and OCRWM Program Baseline Change Control Procedure

  20. District of Columbia Opportunity Scholarship Program: Additional Policies and Procedures Would Improve Internal Controls and Program Operations. Report to Congressional Requesters. GAO-08-9

    Science.gov (United States)

    Ashby, Cornelia M.; Franzel, Jeanette M.

    2007-01-01

    The D.C. School Choice Incentive Act created the first private kindergarten-through-grade-12 school-choice program supported by federal funds. The program was named the D.C. Opportunity Scholarship Program (OSP). The United States Government Accountability Office (GAO) was asked to assess the (1) accountability mechanisms governing the use of…

  1. An operational health physics quality assurance program

    International Nuclear Information System (INIS)

    Costigan, S.A.; McAtee, J.L. III; Somers, W.M.; Huchton, R.L.

    1996-01-01

    DOE Order 5700.6C, Quality Assurance, stipulates QA requirements for all DOE activities. This order is now codified as 10CFR830.120, Nuclear Safety Management, Quality Assurance Requirements, which is applicable to DOE nuclear facilities. A Quality Assurance Management Plan (QAMP) was developed by the Health Physics Operations Group (ESH-1) at Los Alamos National Laboratory (LANL). The goal of the ESH-1 QAMP is to ensure that operational radiation protection activities meet the criteria outlined in DOE Order 5700.6C, DOE-ER-STD-6001-92 and 10CFR830.120. The ten required elements are QA Program, Personal Training and Qualifications, Quality Improvement, Documents and Records, Work Processes, Design, Procurement, Inspection and Acceptance Testing, Management Assessment and Independent Assessment. The QAMP has been useful for the development of QAMPs at nuclear facilities and has helped ensure uniformity of institutional requirements where Health Physics services are deployed to facilities. To implement a subset of QAMP requirements, a Quality Assurance Self-Evaluation Program (QASE) was established. This program provides a novel self-audit mechanism for the formal identification and correction of non-conforming items related to Operational Health Physics. Additionally, the QASE is a useful management tool for Radiological Control Technician Supervisors and staff and provides a tracking mechanism for ongoing problem areas. Data have been Collected for two calendar years on a number of concerns that fall into four general categories: radiological posting and labeling, instrumentation, monitoring requirements, and radiological documents/records

  2. Angra nuclear plant - environmental control program

    International Nuclear Information System (INIS)

    Kircher, E.; Cruz, E.S. da

    1989-01-01

    The pre-operational studies, that were elaborated before the beginning of Angra I Power Plant operation, are described in particular the environmental radiological safety area till the fuel loading in the core reactor. Several aspects are included, as socio-economic survey, seismological analysis, Meteorological Program, marine biology, water cooling system, exposure measures of natural radiation, marine sediments characterization in the effluent dispersion area and Environmental Radiological Monitoring Program. The main environmental programs developed for the operational phase of the Angra I Plant are also presented, citing some considerations about the Meteorological Program, Marine Biology Control Program, Temperature and Chlorine Control in Piraquara de Fora Bay, Radiological Environmental Monitoring Program, Sanitary Effluent Control Program and Radiological Emergency Program. (C.G.C.). 2 refs

  3. Apollo guidance, navigation and control: Guidance system operations plan for manned CM earth orbital and lunar missions using Program COLOSSUS 3. Section 3: Digital autopilots (revision 14)

    Science.gov (United States)

    1972-01-01

    Digital autopilots for the manned command module earth orbital and lunar missions using program COLOSSUS 3 are discussed. Subjects presented are: (1) reaction control system digital autopilot, (2) thrust vector control autopilot, (3) entry autopilot and mission control programs, (4) takeover of Saturn steering, and (5) coasting flight attitude maneuver routine.

  4. Controlled thermonuclear research program

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Plasma Physics and Controlled-Fusion Research Program at the Lawrence Berkeley Laboratory is divided into five projects: Plasma Production and Heating Experiments, Plasma Theory, Atomic Physics Studies, the Tormac Project, and Neutral-Beam Development and Technology listed in order of increasing magnitude, as regards manpower and budget. Some cross sections and yields are shown in atomic physics

  5. Apollo guidance, navigation and control: Guidance system operations plans for manned LM earth orbital and lunar missions using Program COLOSSUS 3. Section 7: Erasable memory programs

    Science.gov (United States)

    Hamilton, M. H.

    1972-01-01

    Erasable-memory programs (EMPs) designed for the guidance computers used in the command (CMC) and lunar modules (LGC) are described. CMC programs are designated COLOSSUS 3, and the associated EMPs are identified by a three-digit number beginning with 5. LGC programs are designated LUMINARY 1E, and the associated EMPs are identified, with one exception, by a three-digit number beginning with 1. The exception is EMP 99. The EMPs vary in complexity from a simple flagbit setting to a long and intricate logical structure. They all, however, cause the computer to behave in a way not intended in the original design of the programs; they accomplish this off-nominal behavior by some alteration of erasable memory to interface with existing fixed-memory programs to effect a desired result.

  6. Operational Control of Internal Transport

    NARCIS (Netherlands)

    J.R. van der Meer (Robert)

    2000-01-01

    textabstractOperational Control of Internal Transport considers the control of guided vehicles in vehicle-based internal transport systems found in facilities such as warehouses, production plants, distribution centers and transshipment terminals. The author's interest of research having direct use

  7. IT Strategic and Operational Controls

    CERN Document Server

    Kyriazoglou, J

    2010-01-01

    This book provides a comprehensive guide to implementing an integrated and flexible set of IT controls in a systematic way. It can help organisations to formulate a complete culture for all areas which must be supervised and controlled; allowing them to simultaneously ensure a secure, high standard whilst striving to obtain the strategic and operational goals of the company.

  8. Cernavoda NPP operations training programs

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this document is to describe the philosophy, content and minimum requirements for the Cernavoda Training Programs for all Station staff and to identify the training department organization and respective responsibilities necessary to provide the required training. The hierarchical documentation and requirements related to these programs is shown in figure Rd-TR1-1

  9. [Inter-and intra-operator variability in the analysis of semen parameters: results from a quality control program].

    Science.gov (United States)

    Daoud, Salima; Chakroun-Feki, Nozha; Sellami, Afifa; Ammar-Keskes, Leila; Rebai, Tarek

    2016-01-01

    Semen analysis is a key part of male infertility investigation. The necessity of quality management implementation in the andrology laboratory has been recognized in order to ensure the reliability of its results. The aim of this study was to evaluate intra- and inter-individual variability in the assessment of semen parameters in our laboratory through a quality control programme. Four participants from the laboratory with different experience levels have participated in this study. Semen samples of varying quality were assessed for sperm motility, concentration and morphology and the results were used to evaluate inter-participant variability. In addition, replicates of each semen sample were analyzed to determine intra-individual variability for semen parameters analysis. The average values of inter-participant coefficients of variation for sperm motility, concentration and morphology were 12.8%, 19.8% and 48.9% respectively. The mean intra-participant coefficients of variation were, respectively, 6.9%, 12.3% and 42.7% for sperm motility, concentration and morphology. Despite some random errors of under- or overestimation, the overall results remained within the limits of acceptability for all participants. Sperm morphology assessment was particularly influenced by the participant's level of experience. The present data emphasize the need for appropriate training of the laboratory staff and for regular participation in internal quality control programmes in order to improve the reliability of laboratory results.

  10. Operators manual for a computer controlled impedance measurement system

    Science.gov (United States)

    Gordon, J.

    1987-02-01

    Operating instructions of a computer controlled impedance measurement system based in Hewlett Packard instrumentation are given. Hardware details, program listings, flowcharts and a practical application are included.

  11. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  12. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  13. Emergency Management Operations Process Mapping: Public Safety Technical Program Study

    Science.gov (United States)

    2011-02-01

    services Operational Activity Collect and Manage Cash Donations Once activated, refer cash donations to appropriate voluntary organizations...recovery operations. Operational Activity Conduct Euthanasia /Disposal Provide humane methods to euthanize affected animals to stop the spread of the...issue stop movement orders, and initiate animal vaccination and treatment programs, euthanasia efforts, or other protective measures designed to control

  14. Operating System For Numerically Controlled Milling Machine

    Science.gov (United States)

    Ray, R. B.

    1992-01-01

    OPMILL program is operating system for Kearney and Trecker milling machine providing fast easy way to program manufacture of machine parts with IBM-compatible personal computer. Gives machinist "equation plotter" feature, which plots equations that define movements and converts equations to milling-machine-controlling program moving cutter along defined path. System includes tool-manager software handling up to 25 tools and automatically adjusts to account for each tool. Developed on IBM PS/2 computer running DOS 3.3 with 1 MB of random-access memory.

  15. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  16. EFFECT OF SUPERVISED MODERATE INTENSITY EXERCISE PROGRAM IN PHASE ONE CARDIAC REHABILITATION OF POST OPERATIVE CABG PATIENTS - A RANDOMIZED CONTROLLED TRAIL

    Directory of Open Access Journals (Sweden)

    Rajan Modi

    2014-10-01

    Full Text Available Background: With the increasing number of cases for CABG, the cardiac rehabilitation has gained importance. The trends in rehabilitation of a coronary artery disease patient are changing by incorporating a variety of aerobic exercises and resisted training in to their rehabilitation program. The outcome of any exercise chiefly depends on the training parameters like intensity, frequency and duration. Hence the present study focused to know the effects of supervised moderate intensity exercises on patients during hospital discharge following CABG. The objective of is to study the effectiveness of supervised moderate intensity exercise on distance walked and Quality of Life at hospital discharge following CABG. Methods: Study recruited randomly 46 patients between age group 40-65 years who were posted for non-emergency CABG for the first time. Pre-operative assessment was done thoroughly and was divided in to two groups, Group A conventional treatment and Group B Moderate intensity exercise group. The patients were treated using different protocols in terms of intensity for 8-10 days immediate post CABG. Then the outcome parameters of 6MWT and sf-36 were compared for analysis. Results: Both groups individually showed extremely significant results for two outcome measures. 6 MWD difference between two treatment groups showed significant results with unpaired t test (t = 8.5720,p<0.001. Quality of life score difference within group showed very significant results but there is no difference found between both groups. Conclusion: Moderate intensity exercises can also be included in the immediate post-operative phase of CABG, as they reduce the length of hospital stay and quicken the cardiac rehabilitation process. But there need to be a lot of randomized control trails to confirm the benefits of moderate intensity exercises in phase one rehabilitation program after CABG.

  17. IADC's well control accreditation program

    International Nuclear Information System (INIS)

    Kropla, S.M.

    1997-01-01

    WellCAP is a well control accreditation program devised and implemented by the International Association of Drilling Contractors (IADC). It is a worldwide comprehensive system that defines a well control training curriculum, establishes minimum standards and recommends guidelines for course structure. The program began in mid-1993 and is viewed as a means for training institutions to demonstrate industry recognition to customers, contractors and local governments. Schools can apply to have their courses accredited. The accreditation system is administered by a review panel. The application process requires that the school perform a detailed review of its curriculum and operations and bring them in line with the WellCAP curriculum and accreditation criteria. Currently, more than 75 schools around the world have requested application materials for WellCAP. To date fifteen schools have been fully accredited

  18. Control valve friction operational experience at Darlington NGD

    International Nuclear Information System (INIS)

    Speer, B.

    1995-01-01

    Proper installation of valve packing is an important part of ensuring that control valves operate as intended. Darlington NGD has developed a Valve Packing Program. This program combined with valve diagnostics has enabled the station to ensure that the operability of control valves is maintained after repacking. This paper outlines the process that is used for this. (author)

  19. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    Combat/operational stress control, defined as programs and policies to prevent, identify, and manage adverse combat/operational stress reactions, is the primary responsibility of military commanders...

  20. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  1. Recommended radiological controls for tritium operations

    International Nuclear Information System (INIS)

    Mansfield, G.

    1992-01-01

    This informal report presents recommendations for an adequate radiological protection program for tritium operations. Topics include hazards analysis, facility design, personnel protection equipment, training, operational procedures, radiation monitoring, to include surface and airborne tritium contamination, and program management

  2. Lithium control during normal operation

    International Nuclear Information System (INIS)

    Suryanarayan, S.; Jain, D.

    2010-01-01

    Periodic increases in lithium (Li) concentrations in the primary heat transport (PHT) system during normal operation are a generic problem at CANDU® stations. Lithiated mixed bed ion exchange resins are used at stations for pH control in the PHT system. Typically tight chemistry controls including Li concentrations are maintained in the PHT water. The reason for the Li increases during normal operation at CANDU stations such as Pickering was not fully understood. In order to address this issue a two pronged approach was employed. Firstly, PNGS-A data and information from other available sources was reviewed in an effort to identify possible factors that may contribute to the observed Li variations. Secondly, experimental studies were carried out to assess the importance of these factors in order to establish reasons for Li increases during normal operation. Based on the results of these studies, plausible mechanisms/reasons for Li increases have been identified and recommendations made for proactive control of Li concentrations in the PHT system. (author)

  3. Tritium Systems Test Assembly operator training program

    International Nuclear Information System (INIS)

    Kerstiens, F.L.

    1985-01-01

    Proper operator training is needed to help ensure the safe operation of fusion facilities by personnel who are qualified to carry out their assigned responsibilities. Operators control and monitor the Tritium Systems Test Assembly (TSTA) during normal, emergency, and maintenance phases. Their performance is critical both to operational safety, assuring no release of tritium to the atmosphere, and to the successful simulation of the fusion reaction progress. Through proper training we are helping assure that TSTA facility operators perform their assignments in a safe and efficient manner and that the operators maintain high levels of operational proficiency through continuing training, retraining, requalification, and recertification

  4. Status of an operating reliability program

    International Nuclear Information System (INIS)

    Johnson, R.A.

    1985-01-01

    This paper deals with productivity improvement programs (PIP) for nuclear generating plants. The PIP was implemented in 1979 as a joint effort between Commonwealth Edison's (CECo's) operating nuclear stations and the Station Nuclear Engineering Department. Goals were set to reduce nonproductivity by 10% over a 5 year period. This goal was accomplished December 31, 1983. Topics of discussion are program method, problem analysis and resolution, program results, program improvements, and proposed additions to the PIP. The program is providing CECo with greater electrical generating productivity

  5. Quantum circuits cannot control unknown operations

    International Nuclear Information System (INIS)

    Araújo, Mateus; Feix, Adrien; Costa, Fabio; Brukner, Časlav

    2014-01-01

    One of the essential building blocks of classical computer programs is the ‘if’ clause, which executes a subroutine depending on the value of a control variable. Similarly, several quantum algorithms rely on applying a unitary operation conditioned on the state of a control system. Here we show that this control cannot be performed by a quantum circuit if the unitary is completely unknown. The task remains impossible even if we allow the control to be done modulo a global phase. However, this no-go theorem does not prevent implementing quantum control of unknown unitaries in practice, as any physical implementation of an unknown unitary provides additional information that makes the control possible. We then argue that one should extend the quantum circuit formalism to capture this possibility in a straightforward way. This is done by allowing unknown unitaries to be applied to subspaces and not only to subsystems. (paper)

  6. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  7. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  8. Implementation and evaluation of an interprofessional simulation-based education program for undergraduate nursing students in operating room nursing education: a randomized controlled trial.

    Science.gov (United States)

    Wang, Rongmei; Shi, Nianke; Bai, Jinbing; Zheng, Yaguang; Zhao, Yue

    2015-07-09

    The present study was designed to implement an interprofessional simulation-based education program for nursing students and evaluate the influence of this program on nursing students' attitudes toward interprofessional education and knowledge about operating room nursing. Nursing students were randomly assigned to either the interprofessional simulation-based education or traditional course group. A before-and-after study of nursing students' attitudes toward the program was conducted using the Readiness for Interprofessional Learning Scale. Responses to an open-ended question were categorized using thematic content analysis. Nursing students' knowledge about operating room nursing was measured. Nursing students from the interprofessional simulation-based education group showed statistically different responses to four of the nineteen questions in the Readiness for Interprofessional Learning Scale, reflecting a more positive attitude toward interprofessional learning. This was also supported by thematic content analysis of the open-ended responses. Furthermore, nursing students in the simulation-based education group had a significant improvement in knowledge about operating room nursing. The integrated course with interprofessional education and simulation provided a positive impact on undergraduate nursing students' perceptions toward interprofessional learning and knowledge about operating room nursing. Our study demonstrated that this course may be a valuable elective option for undergraduate nursing students in operating room nursing education.

  9. Relaxed Operational Semantics of Concurrent Programming Languages

    Directory of Open Access Journals (Sweden)

    Gustavo Petri

    2012-08-01

    Full Text Available We propose a novel, operational framework to formally describe the semantics of concurrent programs running within the context of a relaxed memory model. Our framework features a "temporary store" where the memory operations issued by the threads are recorded, in program order. A memory model then specifies the conditions under which a pending operation from this sequence is allowed to be globally performed, possibly out of order. The memory model also involves a "write grain," accounting for architectures where a thread may read a write that is not yet globally visible. Our formal model is supported by a software simulator, allowing us to run litmus tests in our semantics.

  10. Operative Landscape at Canadian Neurosurgery Residency Programs.

    Science.gov (United States)

    Tso, Michael K; Dakson, Ayoub; Ahmed, Syed Uzair; Bigder, Mark; Elliott, Cameron; Guha, Daipayan; Iorio-Morin, Christian; Kameda-Smith, Michelle; Lavergne, Pascal; Makarenko, Serge; Taccone, Michael S; Wang, Bill; Winkler-Schwartz, Alexander; Sankar, Tejas; Christie, Sean D

    2017-07-01

    Background Currently, the literature lacks reliable data regarding operative case volumes at Canadian neurosurgery residency programs. Our objective was to provide a snapshot of the operative landscape in Canadian neurosurgical training using the trainee-led Canadian Neurosurgery Research Collaborative. Anonymized administrative operative data were gathered from each neurosurgery residency program from January 1, 2014, to December 31, 2014. Procedures were broadly classified into cranial, spine, peripheral nerve, and miscellaneous procedures. A number of prespecified subspecialty procedures were recorded. We defined the resident case index as the ratio of the total number of operations to the total number of neurosurgery residents in that program. Resident number included both Canadian medical and international medical graduates, and included residents on the neurosurgery service, off-service, or on leave for research or other personal reasons. Overall, there was an average of 1845 operative cases per neurosurgery residency program. The mean numbers of cranial, spine, peripheral nerve, and miscellaneous procedures were 725, 466, 48, and 193, respectively. The nationwide mean resident case indices for cranial, spine, peripheral nerve, and total procedures were 90, 58, 5, and 196, respectively. There was some variation in the resident case indices for specific subspecialty procedures, with some training programs not performing carotid endarterectomy or endoscopic transsphenoidal procedures. This study presents the breadth of neurosurgical training within Canadian neurosurgery residency programs. These results may help inform the implementation of neurosurgery training as the Royal College of Physicians and Surgeons residency training transitions to a competence-by-design curriculum.

  11. A reliability program approach to operational safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques is being formulated for potential application in the nuclear power industry. Methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed and a review of current nuclear risk-dominant issues conducted. The need for a reliability approach to address dependent system failures, operating and emergency procedures and human performance, and develop a plant-specific performance data base for safety decision making is demonstrated. Current research has concentrated on developing a Reliability Program approach for the operating phase of a nuclear plant's lifecycle. The approach incorporates performance monitoring and evaluation activities with dedicated tasks that integrate these activities with operation, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the Reliability Program. (orig./HP)

  12. 49 CFR 236.777 - Operator, control.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operator, control. 236.777 Section 236.777..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.777 Operator, control. An employee assigned to operate the control machine of a traffic control system. ...

  13. A NEW MUTATION OPERATOR IN GENETIC PROGRAMMING

    Directory of Open Access Journals (Sweden)

    Anuradha Purohit

    2013-01-01

    Full Text Available This paper proposes a new type of mutation operator, FEDS (Fitness, Elitism, Depth, and Size mutation in genetic programming. The concept behind the new mutation operator is inspired from already introduced FEDS crossover operator to handle the problem of code bloating. FEDS mutation operates by using local elitism replacement in combination with depth limit and size of the trees to reduce bloat with a subsequent improvement in the performance of trees (program structures. We have designed a multiclass classifier for some benchmark datasets to test the performance of proposed mutation. The results show that when the initial run uses FEDS crossover and the concluding run uses FEDS mutation, then not only is the final result significantly improved but there is reduction in bloat also.

  14. Operational budgeting using fuzzy goal programming

    OpenAIRE

    Saeed Mohammadi; Kamran Feizi; Ali Khatami Firouz Abadi

    2013-01-01

    Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate oper...

  15. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  16. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  17. SSS-A attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.

    1971-01-01

    A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

  18. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  19. Atlantic Richfield Hanford Company chemical operator training program

    International Nuclear Information System (INIS)

    Zumhoff, R.G.

    1975-01-01

    Formal training and testing of Chemical Operators at Hanford were initiated as part of a negotiated union settlement in 1966. Consequently, it was agreed that 25 percent of the chemical operator force would receive a higher rated job (Lead Nuclear Chemical Operator) provided they satisfactorily completed a training program including testing. The training and testing program was developed in two parts. The first covered subjects of a general nature and was applicable to an operator's duties no matter what the assignment. Part II was more specifically oriented to the presently assigned work area. Renewed interest in retraining and requalification of all chemical operators was taken in 1971. This evolved from a Company concern that a program be developed to assure the fact that operators were qualified to do their assigned jobs, and an Atomic Energy Commission request for an outline of a retraining and requalification program for chemical operators. Building upon the experience gained in the LNCO (Lead Nuclear Chemical Operator) program, the two part format is retained. The use of video tapes is used to complement the manuals. An arrangement where an operator can view a lecture-type presentation is provided in seven plant locations. A small studio for in-house production of the video tapes is available to the training Specialists. A script is developed from a training manual by condensing the information into 20-minute presentations. A prime objective of each tape is to highlight the safety and control aspects that accompany operator responsibilities in each of these areas. Testing is also handled on a two part basis; one test covers the fundamentals and a separate test is designed for each of the plant subjects. A walk-through examination is also performed for the plant portion. Operators are required to be requalified on emergency procedures on an annual basis and at two-year intervals in the other areas. (U.S.)

  20. Operational budgeting using fuzzy goal programming

    Directory of Open Access Journals (Sweden)

    Saeed Mohammadi

    2013-10-01

    Full Text Available Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate operational budget. The proposed model uses fuzzy triangular as well as interval number to estimate budgeting expenses. The proposed study of this paper is implemented for a real-world case study in province of Qom, Iran and the results are analyzed.

  1. Conducting an inspection of protection program operations

    International Nuclear Information System (INIS)

    Brown, S.; Howell, J.

    1987-01-01

    Protection Program Operations (PPO) encompasses the entire physical security program at a facility, including security construction and equipment, procedures, forces, management and supervision, and the integration of these elements into a total system. PPO subtopics are Physical Security Systems (PSS), Protection Forces (PF), and System Performance Tests (SPT). PSS assesses those security elements designed to protect security interests, and include sensors, surveillance devices, systems for transmission and integration of alarm and assessment information, barriers, lighting, etc. PF assesses the management, training, equipment and facilities, and skills and knowledge of the protective force. SPT includes Force-on-Force, Emergency Management Performance Test, and Limited Scope Performance Tests

  2. Allied-General operator training program

    International Nuclear Information System (INIS)

    Ayers, A.L.; Ebel, P.E.

    1975-01-01

    All operators at Allied-General Nuclear Services are initially trained in the basic concepts of radiation and radiation protection, they are drilled in the basic technical tools needed for further training, they are instructed in the design and operation of the Barnwell Nuclear Fuel Plant, and they are introduced to the actual operations via operating procedures. This all occurs during the Before-the-Baseline training phase and then the operators move on Beyond-the-Baseline. There they physically learn how to do their job at their own pace using checklists as a guide. All operators are then internally certified. Progression is based on demonstrated ability and those that qualify go on to jobs requiring NRC licenses. Upon internal certification, retraining commences immediately and will continue in its four month, one year, and two year cycles. Current feedback from the various classes that have completed the courses and are now in the retraining program indicates that this combination of initial technical training, on-the-job training, and retraining will produce and maintain effective, safe, and efficient operators

  3. High level programming for the control of a tele operating mobile robot and with line following; Programacion de alto nivel para el control de un robot movil teleoperado y con seguimiento de linea

    Energy Technology Data Exchange (ETDEWEB)

    Bernal U, E. [Instituto Tecnologico de Toluca, Metepec, Estado de Mexico (Mexico)

    2006-07-01

    The TRASMAR automated vehicle was built with the purpose of transporting radioactive materials, it has a similar kinematic structure to that of a tricycle, in where the front wheel is the one in charge of offering the traction and direction, both rear wheels rotate freely and they are subject to a common axle. The electronic design was carried out being based on a MC68HC811 micro controller of the Motorola company. Of the characteristics that the robot possesses it stands out that it counts with an obstacle perception system through three ultrasonic sensors located in the front part of the vehicle to avoid collisions. The robot has two operation modes, the main mode is the manual, manipulated through a control by infrareds, although it can also move in autonomous way by means of the line pursuit technique using two reflective infrared sensors. As any other electronic system, the mobile robot required of improvements and upgrades. The modifications to be carried out were focused to the control stage. Its were intended as elements of upgrade the incorporation of the MC68HC912B32 micro controller and to replace the assembler language characteristic of this type of systems, by a high level language for micro controllers of this type, in this case the FORTH. In a same way it was implemented inside the program the function of the robot's displacement in an autonomous way by means of the line pursuit technique using control with fuzzy logic. The carried out work is distributed in the following way: In the chapter 1 the robot's characteristics are mentioned, as well as the objectives that thought about to the beginning of the project and the justifications that motivated the realization of this upgrade. In the chapters 2 at 5 are presented in a theoretical way the supports used for the the robot's upgrade, as the used modules of the micro controller, those main characteristics of the FORTH language, the theory of the fuzzy logic and the design of the stage

  4. High level programming for the control of a tele operating mobile robot and with line following; Programacion de alto nivel para el control de un robot movil teleoperado y con seguimiento de linea

    Energy Technology Data Exchange (ETDEWEB)

    Bernal U, E [Instituto Tecnologico de Toluca, Metepec, Estado de Mexico (Mexico)

    2006-07-01

    The TRASMAR automated vehicle was built with the purpose of transporting radioactive materials, it has a similar kinematic structure to that of a tricycle, in where the front wheel is the one in charge of offering the traction and direction, both rear wheels rotate freely and they are subject to a common axle. The electronic design was carried out being based on a MC68HC811 micro controller of the Motorola company. Of the characteristics that the robot possesses it stands out that it counts with an obstacle perception system through three ultrasonic sensors located in the front part of the vehicle to avoid collisions. The robot has two operation modes, the main mode is the manual, manipulated through a control by infrareds, although it can also move in autonomous way by means of the line pursuit technique using two reflective infrared sensors. As any other electronic system, the mobile robot required of improvements and upgrades. The modifications to be carried out were focused to the control stage. Its were intended as elements of upgrade the incorporation of the MC68HC912B32 micro controller and to replace the assembler language characteristic of this type of systems, by a high level language for micro controllers of this type, in this case the FORTH. In a same way it was implemented inside the program the function of the robot's displacement in an autonomous way by means of the line pursuit technique using control with fuzzy logic. The carried out work is distributed in the following way: In the chapter 1 the robot's characteristics are mentioned, as well as the objectives that thought about to the beginning of the project and the justifications that motivated the realization of this upgrade. In the chapters 2 at 5 are presented in a theoretical way the supports used for the the robot's upgrade, as the used modules of the micro controller, those main characteristics of the FORTH language, the theory of the fuzzy logic and the design of the stage of power that

  5. Limiting conditions for operation relaxation program

    International Nuclear Information System (INIS)

    Merz, J.F.

    1985-01-01

    The purpose of this effort was to assess the impact of system maintenance unavailability on plant risk to provide technical justification for the relaxation of system limiting conditions for operation from three to seven days. The primary goal of the relaxation program is to allow for more thorough equipment maintenance. A potential increase in out-of-service time for a particular outage caused by the performance of more effective repairs will be counterbalanced by a probable decrease in the frequency in the outage rate of a component. Benefits resulting from an increase in allowed outage time include: (a) a potential reduction in total system out-of-service time, (b) a minimization of challenges to plant systems, and (c) a reduction in the number of emergency technical specification change requests. This program therefore offers an opportunity to more effectively manage plant maintenance and operation

  6. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  7. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  8. Advanced control room caters for the operator

    International Nuclear Information System (INIS)

    George, C.R.; Rygg, D.E.

    1980-01-01

    In existing control rooms the operators' efficiency is often limited by widely scattered and sometimes illogically arranged controls which tend to increase the potential for outages or equipment damage. The advanced control room described allows instant and ready access to preselected information and control by one or two operators from a seated or standing position. (author)

  9. Operation control device under radiation exposure

    International Nuclear Information System (INIS)

    Kimura, Kiichi; Murakami, Toichi.

    1994-01-01

    The device of the present invention performs smooth progress of operation by remote control for a plurality of operations in periodical inspections in controlled areas of a nuclear power plant, thereby reducing the operator's exposure dose. Namely, the device monitors the progressing state of the operation by displaying the progress of operation on a CRT of a centralized control device present in a low dose area remote from an operation field through an ITV camera disposed in the vicinity of the operation field. Further, operation sequence and operation instruction procedures previously inputted in the device are indicated to the operation field through an operation instruction outputting device (field CRT) in accordance with the progress of the operation steps. On the other hand, the operation progress can be aided by inputting information from the operation field such as start or completion of the operation steps. Further, the device of the present invention can monitor the change of operation circumstances and exposure dose of operators based on the information from a radiation dose measuring device disposed in the operation circumstance and to individual operators. (I.S.)

  10. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  11. Measurement control program for new special recovery

    International Nuclear Information System (INIS)

    Hsue, S.T.; Campbell, K.; Barlich, G.

    1987-04-01

    This report summarizes the design of the measurement control (MC) program for the New Special Recovery facility. The MC program is divided into two levels. Level 1 MC checks are performed at the individual instrument computer and will always be functional even when the instrument-control computer is down. The level 1 MCs are divided into statistical checks for both bias and precision, and diagnostic checks. All the instruments are connected on line to an instrument-control computer to which the measurement results can be communicated. Level 2 MC analyses are performed at this computer. The analyses consist of control charts for bias and precision and statistical tests used as analytic supplements to the control charts. They provide the desired detection sensitivity and yet can be interpreted quickly and easily. Recommendations are also made in terms of the frequency of the tests, the standard used, and other operational aspects of the MC program. 16 refs., 11 figs., 10 tabs

  12. REACTOR CONTROL ROD OPERATING SYSTEM

    Science.gov (United States)

    Miller, G.

    1961-12-12

    A nuclear reactor control rod mechanism is designed which mechanically moves the control rods into and out of the core under normal conditions but rapidly forces the control rods into the core by catapultic action in the event of an emergency. (AEC)

  13. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  14. The role of the control room operator

    International Nuclear Information System (INIS)

    Williams, M.C.

    A control room operator at an Ontario Hydro nuclear power plant operates a reactor-turbine unit according to approved procedures within imposed constraints to meet the objectives of the organization. A number of operating and administrative tasks make up this role. Control room operators spend approximately six percent of their time physically operating equipment exclusive of upset conditions, and another one percent operating in upset conditions. Testing occupies five percent of an operator's time. Operators must be trained to recognize the entire spectrum of inputs available to them and use them all effectively. Any change in system or unit state is always made according to an approved procedure. Extensive training is required; operators must be taught and pracised in what to do, and must know the reasons behind their actions. They are expected to memorize emergency procedures, to know when to consult operating procedures, and to have sufficient understanding and practice to perform these procedures reliably

  15. Trainer module for security control center operations

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1982-01-01

    An operator trainer module has been developed to be used with the security control center equipment to be installed as part of a safeguards physical protection system. The module is designed to provide improved training and testing capabilities for control center operators through the use of simulations for perimeter equipment operations. Operators, through the trainer module, can be challenged with a variety of realistic situations which require responsive action identical to that needed in an actual system. This permits a consistent evaluation and confirmation of operator capabilities prior to assignment as an operator and allows for periodic retesting to verify that adequate performance levels are maintained

  16. 50 CFR 253.18 - Program operating guidelines.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Program operating guidelines. 253.18 Section 253.18 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Guarantee Program § 253.18 Program operating guidelines. The Division may issue Program operating guidelines...

  17. Optimal Operation of Radial Distribution Systems Using Extended Dynamic Programming

    DEFF Research Database (Denmark)

    Lopez, Juan Camilo; Vergara, Pedro P.; Lyra, Christiano

    2018-01-01

    An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation o...... approach is illustrated using real-scale systems and comparisons with commercial programming solvers. Finally, generalizations to consider other EDS operation problems are also discussed.......An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation...... of the EDS by setting the values of the controllable variables at each time period. A suitable definition for the stages of the problem makes it possible to represent the optimal ac power flow of radial EDS as a dynamic programming problem, wherein the 'curse of dimensionality' is a minor concern, since...

  18. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  19. Co-operatives and Normative Control

    DEFF Research Database (Denmark)

    Bregn, Kirsten; Jagd, Søren

    1992-01-01

    This paper explores the conditions for applying normative control in co-operatives. For normative control to be effective two conditions are found particularly important: Individuals must be morally involved and the organization must have a system of making it possible to link common norms...... and individual action. If these conditions are not fulfilled, as may be the case in many co-operatives, normative control cannot be expected to work. The problems of normative control in co-operatives may then not be caused by the use of normative control as such, but may instead be a problem of securing...

  20. 7 CFR 58.141 - Alternate quality control program.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Alternate quality control program. 58.141 Section 58... Service 1 Quality Specifications for Raw Milk § 58.141 Alternate quality control program. When a plant has in operation an acceptable quality program, at the producer level, which is approved by the...

  1. IMP-J attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Hooper, H. L.; Mckendrew, J. B.; Repass, G. D.

    1973-01-01

    A description of the attitude control support being supplied for the Explorer 50 mission is given. Included in the document are descriptions of the computer programs being used to support attitude determination, prediction, and control for the mission and descriptions of the operating procedures that will be used to accomplish mission objectives.

  2. Controlling operational risk: Concepts and practices

    NARCIS (Netherlands)

    van den Tillaart, A.H.A.J.

    2003-01-01

    The subject of this thesis is controlling 'operational risk' in banks. Operational risk is defined as the risk of losses resulting from inadequate or failed internal processes, people, systems, or from external events. Within this very broad subject, we focus on the place of operational risk

  3. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  4. Computer programs in BASIC language for atomic absorption flame spectroscopy. Part 1. Operating instructions

    International Nuclear Information System (INIS)

    Boyle, W.G. Jr.

    1977-01-01

    These instructions describe how to use three BASIC language programs to process data from atomic absorption spectrophotometers operated in the flame mode. These programs will also control an automatic sampler if desired. The instructions cover loading the programs, responding to computer prompts, choosing among various options for processing the data, operating the automatic sampler, and producing reports. How the programs differ is also explained. Examples of computer/operator dialogue are presented for typical cases

  5. Power generation, operation and control

    CERN Document Server

    Wood, Allen J; Sheblé, Gerald B

    2013-01-01

    Since publication of the second edition, there have been extensive changes in the algorithms, methods, and assumptions in energy management systems that analyze and control power generation. This edition is updated to acquaint electrical engineering students and professionals with current power generation systems. Algorithms and methods for solving integrated economic, network, and generating system analysis are provided. Also included are the state-of-the-art topics undergoing evolutionary change, including market simulation, multiple market analysis, multiple interchange contract analysis, c

  6. Computer control for remote wind turbine operation

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, J.F.; Rogers, A.L.; Abdulwahid, U.; Driscoll, J. [Univ. of Massachusetts, Amherst, MA (United States)

    1997-12-31

    Light weight wind turbines located in harsh, remote sites require particularly capable controllers. Based on extensive operation of the original ESI-807 moved to such a location, a much more sophisticated controller than the original one has been developed. This paper describes the design, development and testing of that new controller. The complete control and monitoring system consists of sensor and control inputs, the control computer, control outputs, and additional equipment. The control code was written in Microsoft Visual Basic on a PC type computer. The control code monitors potential faults and allows the turbine to operate in one of eight states: off, start, run, freewheel, low wind shut down, normal wind shutdown, emergency shutdown, and blade parking. The controller also incorporates two {open_quotes}virtual wind turbines,{close_quotes} including a dynamic model of the machine, for code testing. The controller can handle numerous situations for which the original controller was unequipped.

  7. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  8. Engineering Process Monitoring for Control Room Operation

    OpenAIRE

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close coll...

  9. User Control Interface for W7-X Plasma Operation

    International Nuclear Information System (INIS)

    Spring, A.; Laqua, H.; Schacht, J.

    2006-01-01

    The WENDELSTEIN 7-X fusion experiment will be a highly complex device operated by a likewise complex control system. The fundamental configuration of the W7-X control system follows two major design principles: It reflects the strict hierarchy of the machine set-up with a set of subordinated components, which in turn can be run autonomously during commissioning and testing. Secondly, it links the basic machine operation (mainly given by the infrastructure status and the components readiness) and the physics program execution (i.e. plasma operation) on each hierarchy level and on different time scales. The complexity of the control system implies great demands on appropriate user interfaces: specialized tools for specific control tasks allowing a dedicated view on the subject to be controlled, hiding complexity wherever possible and reasonable, providing similar operation methods on each hierarchy level and both manual interaction possibilities and a high degree of intelligent automation. The contribution will describe the operation interface for experiment control including the necessary links to the machine operation. The users of ' Xcontrol ' will be both the W7-X session leaders during plasma discharge experiments and the components' or diagnostics' operators during autonomous mode or even laboratory experiments. The main ' Xcontrol ' features, such as program composition and validation, manual and automatic control instruments, resource survey, and process monitoring, will be presented. The implementation principles and the underlying communication will be discussed. (author)

  10. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000 to 2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  11. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2002-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  12. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin coal

  13. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  14. General predictive control using the delta operator

    DEFF Research Database (Denmark)

    Jensen, Morten Rostgaard; Poulsen, Niels Kjølstad; Ravn, Ole

    1993-01-01

    This paper deals with two-discrete-time operators, the conventional forward shift-operator and the δ-operator. Both operators are treated in view of construction of suitable solutions to the Diophantine equation for the purpose of prediction. A general step-recursive scheme is presented. Finally...... a general predictive control (GPC) is formulated and applied adaptively to a continuous-time plant...

  15. Automatic operation device for control rods

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1984-01-01

    Purpose: To enable automatic operation of control rods based on the reactor operation planning, and particularly, to decrease the operator's load upon start up and shutdown of the reactor. Constitution: Operation plannings, demand for the automatic operation, break point setting value, power and reactor core flow rate change, demand for operation interrupt, demand for restart, demand for forecasting and the like are inputted to an input device, and an overall judging device performs a long-term forecast as far as the break point by a long-term forecasting device based on the operation plannings. The automatic reactor operation or the like is carried out based on the long-term forecasting and the short time forecasting is performed by the change in the reactor core status due to the control rod operation sequence based on the control rod pattern and the operation planning. Then, it is judged if the operation for the intended control rod is possible or not based on the result of the short time forecasting. (Aizawa, K.)

  16. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  17. Realtime graphics support for remote handling operations in complex working environments within the framework of a control, simulation and off-line programming system

    International Nuclear Information System (INIS)

    Kuehnapfel, U.

    1992-05-01

    The application independent simulation system KISMET was developed. This tool gives a different approach compared to previously existing robot simulators. A hierarchical data structure approach is used for the definition of workcell geometry, assembly topology and mechanism kinematics. This database structure allows for presentation of interactively selectable levels of detail and is, therefore, especially useful for real-time rigid body simulation of complex RH-scenarios. With KISMET, assembly structures can be modelled in any number of detail levels. Workcell geometry, assembly topology and mechanisms can be defined interactively by means of the integrated modeller. The mechanism simulation allows for kinematical tree structures with any number of joints, planar closed chains, and interconnections between joints. Examples of novel simulation methods, data structures, and algorithms are presented for selected examples: the hidden surface problem, graphical presentation techniques, collision testing, and control of scene cameras (image simulation, fast positioning and tracking). Special attention is paid to the real-time problem. The way this system was realized within the UNIX world is shown as an example for geometric and kinematic modelling techniques that grant for the optimum use of the capabilities of high-performance graphics workstations. A further chapter is focussing on the use of standard interfaces for CAD model transfer (CAD * I, STEP) and robot programming (IRDATA). Examples of practical KISMET applications for remote handling in fusion reactors, in a nuclear fuel element reprocessing cell and in sensor based robotics are used to present the developed methods. (orig.) [de

  18. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  19. Computerized accountability program is operating - DYMCAS

    International Nuclear Information System (INIS)

    Combs, S.W.; Mee, W.T.

    1983-01-01

    The nuclear materials control and accountability program in the Oak Ridge Y-12 Plant has been placed on a computerized system identified as DYMCAS (Dynamic Special Nuclear Materials Control and Accountability System). The primary gola of the DYMCAS is to assist in detecting the diversion of special nuclear material (SNM). Secondly, the system is expected to assure quality inventory reconciliations both under normal and emergency situations. The system has been installed and was placed on active status in April 1982. Since that time numerous problems have surfaced and been resolved; i.e., delays of input, hardware breakdown, and misunderstandings of needs. An explanation of these problems, including examples and alterations that have made the system workable, are presented

  20. A computerized accountability program is operating - DYMCAS

    International Nuclear Information System (INIS)

    Combs, S.W.; Mee, W.T.

    1983-01-01

    The nuclear materials control and accountability program in the Oak Ridge Y-12 Plant has been placed on a computerized system identified as DYMCAS (Dynamic Special Nuclear Materials Control and Accountability System). The primary goal of the DYMCAS is to assist in detecting the diversion of special nuclear material (SNM). Secondly, the system is expected to assure quality inventory reconciliations both under normal and emergency situations. The system has been installed and was placed on active status in April 1982. Since that time numerous problems have surfaced and been resolved; i.e., delays of input, hardware breakdown, and misunderstandings of needs. An explanation of these problems, including examples and alterations that have made the system workable, are presented

  1. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  2. Operating control techniques for maglev transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  3. Computer control of shielded cell operations

    International Nuclear Information System (INIS)

    Jeffords, W.R. III.

    1987-01-01

    This paper describes in detail a computer system to remotely control shielded cell operations. System hardware, software, and design criteria are discussed. We have designed a computer-controlled buret that provides a tenfold improvement over the buret currently in service. A computer also automatically controls cell analyses, calibrations, and maintenance. This system improves conditions for the operators by providing a safer, more efficient working environment and is expandable for future growth and development

  4. 47 CFR 76.1710 - Operator interests in video programming.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operator interests in video programming. 76....1710 Operator interests in video programming. (a) Cable operators are required to maintain records in... interests in all video programming services as well as information regarding their carriage of such...

  5. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  6. Patents Assessed through Sectoral Operational Programs

    Directory of Open Access Journals (Sweden)

    Paula – Angela VIDRAȘCU

    2014-06-01

    Full Text Available According to the International Accounting Standards – IAS 38 „Intangible assets”; these assets are identifiable non-monetary assets under construction were considered without physical substance. Lack actual physical form must not be understood that an intangible asset would have no material support, because the presence of any intangible asset can be demonstrated only by a support material form. Exmple: frequently encounter compact-disc (in case a software, legal documentation (in the case of licences, trade marks and patents of invention, contracts, permits and licences, technical documentation or films. Nowadays we are constantly subjected to the changing flow of information that is found in a perpetual technological change which started the emergence of a new stage in the society development that which carries the name of knowledge. The object of my research is the patent for the structural funds reimbursable project submitted in the "Operational Program, Economic Competitiveness" Operation 2.3.1. "Support for start-ups and innovative spin-offs. Patent is an official document certifying the inventor, the exclusive right to produce a certain good or product or use a particular process. Remember that evaluation of intangible assets is the most complex and systematic procedure.

  7. 42 CFR 51.21 - Contracts for program operations.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contracts for program operations. 51.21 Section 51... APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Program Administration and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work...

  8. Salmonella Control Programs in Denmark

    DEFF Research Database (Denmark)

    Wegener, Henrik Caspar; Hald, Tine; Wong, Danilo Lo Fo

    2003-01-01

    We describe Salmonella control programs of broiler chickens, layer hens, and pigs in Denmark. Major reductions in the incidence of foodborne human salmonellosis have occurred by integrated control of farms and food processing plants. Disease control has been achieved by monitoring the herds...... and flocks, eliminating infected animals, and diversifying animals (animals and products are processed differently depending on Salmonella status) and animal food products according to the determined risk. In 2001, the Danish society saved U.S.$25.5 million by controlling Salmonella. The total annual...... Salmonella control costs in year 2001 were U.S.$14.1 million (U.S.$0.075/kg of pork and U.S.$0.02/kg of broiler or egg). These costs are paid almost exclusively by the industry. The control principles described are applicable to most industrialized countries with modern intensive farming systems....

  9. Nuclear thermal rocket engine operation and control

    International Nuclear Information System (INIS)

    Gunn, S.V.; Savoie, M.T.; Hundal, R.

    1993-06-01

    The operation of a typical Rover/Nerva-derived nuclear thermal rocket (NTR) engine is characterized and the control requirements of the NTR are defined. A rationale for the selection of a candidate diverse redundant NTR engine control system is presented and the projected component operating requirements are related to the state of the art of candidate components and subsystems. The projected operational capabilities of the candidate system are delineated for the startup, full-thrust, shutdown, and decay heat removal phases of the engine operation. 9 refs

  10. Modifications to the control program HASP

    International Nuclear Information System (INIS)

    Bartoli, M.; Dall'Olio, L.; Mareso, T.; Ricci, F.

    1973-01-01

    Modification to HASP version 3, level 0, a control program for an electronic computer, was described with the purpose of solving some operative and managing problems not solved by the standard version for the IBM 360/75 computer. The application and utilization of these facilities require a deep knowledge of the HASP II design, version 3, level 0, 360D-05.1.014

  11. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  12. Intelligent tutors for control center operator training

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Z.A. [Porto Univ. (Portugal). Dept. of Electrical and Computer Engineering; Fernandes, M.F.; Marques, A. [Electricity of Portugal, Sacavem (Portugal)

    1995-12-31

    Power systems are presently remotely operated and controlled from control centers that receive on-line information about the power system state. Control center operators have very high-demanding tasks what makes their training a key issue for the performance of the whole power system. Simulators are usually used by electrical utilities for this purpose but they are very expensive applications and their use requires the preparation of the training sessions by qualified training staff which is a very time consuming task. Due to this, these simulators are only used a few times a year. Intelligent Tutoring Systems (ITS) provide some new possibilities for control center operator training making easier its use without much assistance of the teaching staff. On the other hand, an expert system in use in a control center can be adapted to an ITS to train operators without much effort. 18 refs

  13. Intelligent Control and Operation of Distribution System

    DEFF Research Database (Denmark)

    Bhattarai, Bishnu Prasad

    methodology to ensure efficient control and operation of the future distribution networks. The major scientific challenge is thus to develop control models and strategies to coordinate responses from widely distributed controllable loads and local generations. Detailed models of key Smart Grid (SG) elements...... in this direction but also benefit distribution system operators in the planning and development of the distribution network. The major contributions of this work are described in the following four stages: In the first stage, an intelligent Demand Response (DR) control architecture is developed for coordinating...... the key SG actors, namely consumers, network operators, aggregators, and electricity market entities. A key intent of the architecture is to facilitate market participation of residential consumers and prosumers. A Hierarchical Control Architecture (HCA) having primary, secondary, and tertiary control...

  14. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  15. Preventative programs for respiratory disease in cow/calf operations.

    Science.gov (United States)

    Engelken, T J

    1997-11-01

    Control of respiratory disease in cow/calf operations presents many challenges. The incidence of disease in the suckling calf is not well documented and the logistics of handling range animals make control programs difficult to implement. Health programs have to be built around normal working patterns, and these patterns may not provide the best "fit" for immune management of the calf. Weaned calves undergo significant disease challenge when they enter typical marketing channels. This provides the potential for high levels of calf morbidity, mortality, medicine costs, and losses from decreased performance as they arrive at a stocker operation or feedyard. If preweaning calf health and preconditioning programs are used, they must be planned so that the producer has an opportunity to obtain a return on their investment. Options for increasing calf weight marketed, certified calf health sales, or retained ownership through the next phase of production should be evaluated carefully. Any potential increase in calf value must be weighed against program costs. This affords the veterinarian an opportunity to build on traditional disease management and prevention skills and expand their influence in overall ranch management.

  16. Enhancing Safety at Airline Operations Control Centre

    Directory of Open Access Journals (Sweden)

    Lukáš Řasa

    2015-04-01

    Full Text Available In recent years a new term of Safety Management System (SMS has been introduced into aviation legislation. This system is being adopted by airline operators. One of the groundbased actors of everyday operations is Operations Control Centre (OCC. The goal of this article has been to identify and assess risks and dangers which occur at OCC and create a template for OCC implementation into SMS.

  17. Operational Assessment of Controller Complexity, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — In today's operations, acceptable levels of controller workload are maintained by assigning sector capacities based on simple aircraft count and a capacity threshold...

  18. Engineering Process Monitoring for Control Room Operation

    CERN Document Server

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close collaboration of control room teams, exploitation personnel and process specialists. In this paper some principles for the engineering of monitoring information for control room operation are developed at the example of the exploitation of a particle accelerator at the European Laboratory for Nuclear Research (CERN).

  19. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  20. Automatic Control of Freeboard and Turbine Operation

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter Bak; Friis-Madsen, Erik

    The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003.......The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003....

  1. Implementation challenges of a motor operated valve program

    International Nuclear Information System (INIS)

    Ferguson, T.L.

    1995-01-01

    Electric motor operated valves (MOVs) have become a global focus of attention for Nuclear Power Plant (NPP) operators due to reported operability problems in the last decade. Many NPPs have or are in the process of setting up maintenance programs to address MOV operability issues. Bruce B is in the initial stages of implementing such a program. This paper outlines some of the challenges that have been encountered and how they are being approached to establish an effective program. (author)

  2. Operational trade-offs in reservoir control

    Science.gov (United States)

    Georgakakos, Aris P.

    1993-11-01

    Reservoir operation decisions require constant reevaluation in the face of conflicting objectives, varying hydrologic conditions, and frequent operational policy changes. Optimality is a relative concept very much dependent on the circumstances under which a decision is made. More than anything else, reservoir management authorities need the means to assess the impacts of various operational options. It is their responsibility to define what is desirable after a thorough evaluation of the existing circumstances. This article presents a model designed to generate operational trade-offs common among reservoir systems. The model avoids an all-encompassing problem formulation and distinguishes three operational modes (levels) corresponding to normal, drought, and flood operations. Each level addresses only relevant system elements and uses a static and a dynamic control module to optimize turbine performance within each planning period and temporally. The model is used for planning the operation of the Savannah River System.

  3. Method for automatic control rod operation using rule-based control

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Yamada, Naoyuki; Kiguchi, Takashi

    1988-01-01

    An automatic control rod operation method using rule-based control is proposed. Its features are as follows: (1) a production system to recognize plant events, determine control actions and realize fast inference (fast selection of a suitable production rule), (2) use of the fuzzy control technique to determine quantitative control variables. The method's performance was evaluated by simulation tests on automatic control rod operation at a BWR plant start-up. The results were as follows; (1) The performance which is related to stabilization of controlled variables and time required for reactor start-up, was superior to that of other methods such as PID control and program control methods, (2) the process time to select and interpret the suitable production rule, which was the same as required for event recognition or determination of control action, was short (below 1 s) enough for real time control. The results showed that the method is effective for automatic control rod operation. (author)

  4. Program Baseline Change Control Procedure

    International Nuclear Information System (INIS)

    1993-02-01

    This procedure establishes the responsibilities and process for approving initial issues of and changes to the technical, cost, and schedule baselines, and selected management documents developed by the Office of Civilian Radioactive Waste Management (OCRWM) for the Civilian Radioactive Waste Management System. This procedure implements the OCRWM Baseline Management Plan and DOE Order 4700.1, Chg 1. It streamlines the change control process to enhance integration, accountability, and traceability of Level 0 and Level I decisions through standardized Baseline Change Proposal (BCP) forms to be used by the Level 0, 1, 2, and 3 Baseline Change Control Boards (BCCBs) and to be tracked in the OCRWM-wide Configuration Information System (CIS) Database.This procedure applies to all technical, cost, and schedule baselines controlled by the Energy System Acquisition Advisory Board (ESAAB) BCCB (Level 0) and, OCRWM Program Baseline Control Board (PBCCB) (Level 1). All baseline BCPs initiated by Level 2 or lower BCCBs, which require approval from ESAAB or PBCCB, shall be processed in accordance with this procedure. This procedure also applies to all Program-level management documents controlled by the OCRWM PBCCB

  5. Adding control to arbitrary unknown quantum operations

    Science.gov (United States)

    Zhou, Xiao-Qi; Ralph, Timothy C.; Kalasuwan, Pruet; Zhang, Mian; Peruzzo, Alberto; Lanyon, Benjamin P.; O'Brien, Jeremy L.

    2011-01-01

    Although quantum computers promise significant advantages, the complexity of quantum algorithms remains a major technological obstacle. We have developed and demonstrated an architecture-independent technique that simplifies adding control qubits to arbitrary quantum operations—a requirement in many quantum algorithms, simulations and metrology. The technique, which is independent of how the operation is done, does not require knowledge of what the operation is, and largely separates the problems of how to implement a quantum operation in the laboratory and how to add a control. Here, we demonstrate an entanglement-based version in a photonic system, realizing a range of different two-qubit gates with high fidelity. PMID:21811242

  6. Applying interactive control to waste processing operations

    International Nuclear Information System (INIS)

    Grasz, E.L.; Merrill, R.D.; Couture, S.A.

    1992-08-01

    At present waste and residue processing includes steps that require human interaction. The risk of exposure to unknown hazardous materials and the potential for radiation contamination motivates the desire to remove operators from these processes. Technologies that facilitate this include glove box robotics, modular systems for remote and automated servicing, and interactive controls that minimize human intervention. LLNL is developing an automated system which is designed to supplant the operator for glove box tasks, thus protecting the operator from the risk of radiation exposure and minimizing operator-associated waste. Although most of the processing can be automated with minimal human interaction, there are some tasks where intelligent intervention is both desirable and necessary to adapt to Enexpected circumstances and events. These activities require that the operator interact with the process using a remote manipulator which provides or reflects a natural feel to the operator. The remote manipulation system which was developed incorporates sensor fusion and interactive control, and provides the operator with an effective means of controlling the robot in a potentially unknown environment. This paper describes recent accomplishments in technology development and integration, and outlines the future goals of Lawrence Livermore National Laboratory for achieving this integrated interactive control capability

  7. Plant status control - with an operational focus

    International Nuclear Information System (INIS)

    Lane, L.A.

    2000-01-01

    In the Nuclear industry, we have done a very good job of designing, developing, constructing, and improving our nuclear facilities. We have, however, often been inconsistent in documenting the details of our facilities, clearly addressing the rules around facility operation, and controlling and tracking the temporary, or permanent changes to our facilities. The reality is, that once we build a facility, we then must operate the facility, for it to be viable. Further we must operate it safely and efficiently for the facility to produce its product, and be acceptable to the public. Unfortunately, when we design and build these large, complicated facilities, we cannot project all the nuances of facility operation, although we can recognize this potential gap, and prepare for it. In order to allow for the complexities of the real world, we must provide the individuals who are tasked with operating our nuclear facilities, with the tools and processes to deal with 'all the nuances' of facility operation. This discussion will focus on the concepts behind a key process for ensuring that we meet our design and operating needs for our facilities, as well as recognizing and dealing with the potential gaps. The key process is 'Plant Status Control', and the discussion will have a primary focus on the needs of the end users, that being the individuals that have the immediate and current accountability for control and safety of the facility, the equipment, the staff, and ultimately the public, that being our Operations staff, and the Shift Manager. (author)

  8. Operation control device for nuclear power plants

    International Nuclear Information System (INIS)

    Suto, Osamu.

    1982-01-01

    Purpose: To render the controlling functions of a central control console more centralized by constituting the operation controls for a nuclear power plant with computer systems having substantially independent functions such as those of plant monitor controls, reactor monitor management and CRT display and decreasing interactions between each of the systems. Constitution: An input/output device for the input of process data for a nuclear power plant and indication data for a plant control console is connected to a plant supervisory and control computer system and a display computer system, the plant supervisory control computer system and a reactor and management computer system are connected with a CRT display control device, a printer and a CRT display input/output device, and the display computer system is connected with the CRT display control device and the CRT display unit on the central control console, whereby process input can be processed and displayed at high speed. (Yoshino, Y.)

  9. Hydrocarbon control strategies for gasoline marketing operations

    Energy Technology Data Exchange (ETDEWEB)

    Norton, R.L.; Sakaida, R.R.; Yamada, M.M.

    1978-05-01

    This informational document provides basic and current descriptions of gasoline marketing operations and methods that are available to control hydrocarbon emissions from these operations. The three types of facilities that are described are terminals, bulk plants, and service stations. Operational and business trends are also discussed. The potential emissions from typical facilities, including transport trucks, are given. The operations which lead to emissions from these facilities include (1) gasoline storage, (2) gasoline loading at terminals and bulk plants, (3) gasoline delivery to bulk plants and service stations, and (4) the refueling of vehicles at service stations. Available and possible methods for controlling emissions are described with their estimated control efficiencies and costs. This report also includes a bibliography of references cited in the text, and supplementary sources of information.

  10. CV controls from design to operation

    CERN Document Server

    Blanc, D

    2002-01-01

    The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational structure at the end of 98. The main objective of this operation was to ensure the CV group to be more competitive and efficient through the growing tasks of the LHC projects. The main evolution given to this reorganisation is that the new structure is more project oriented and then operates on three distinct axes: Design, Work and Operation. Process control project management requires a complete and early interaction and participation of all the actors involved. This procedure to be efficient and constructive must be considered and performed not only during the design stage but along the project planning phases and must go beyond the completion work including the process control operation activity. The paper explains the present project management for process control. It describes the present constraints and gives suggestions to a different approach to these projects to improve performances and efficiency of a contr...

  11. Hydrate Control for Gas Storage Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Savidge

    2008-10-31

    The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

  12. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  13. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  14. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  15. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  16. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  17. Operations monitoring concept. Consolidated Fuel Reprocessing Program

    International Nuclear Information System (INIS)

    Kerr, H.T.

    1985-01-01

    Operations monitoring is a safeguards concept which could be applied in future fuel cycle facilities to significantly enhance the effectiveness of an integrated safeguards system. In general, a variety of operations monitoring techniques could be developed for both international and domestic safeguards application. The goal of this presentation is to describe specific examples of operations monitoring techniques as may be applied in a fuel reprocessing facility. The operations monitoring concept involves monitoring certain in-plant equipment, personnel, and materials to detect conditions indicative of the diversion of nuclear material. An operations monitoring subsystem should be designed to monitor operations only to the extent necessary to achieve specified safeguards objectives; there is no intent to monitor all operations in the facility. The objectives of the operations monitoring subsystem include: verification of reported data; detection of undeclared uses of equipment; and alerting the inspector to potential diversion activities. 1 fig

  18. Overview of Japanese control rods development program

    International Nuclear Information System (INIS)

    Koyama, M.

    1984-01-01

    The Japanese control rods development program was established based on the fast breeder reactor program. Therefore, PNC's efforts have been made mainly for the development of analysis, design and fabrication technologies for ''JOYO'' and ''MONJU'' control rods. Laboratory studies were performed to obtain the information for absorber materials. The design and fabrication of the sealed and vented type control rod pins were completed, and water loop tests and in-sodium tests were carried out. Irradiation behavior of enriched B 4 C pellets with low and high density in DFR was examined. Japan's experimental fast reactor, JOYO, has been operated at the rated power of 50MWt and 75MWt since April 1977 when the MK-I core (breeder core) attained initial criticality. Post irradiation examinations on control rod, removed from the reactor, were carried out and their performance behavior were evaluated. In the MK-II core, a control rods monitoring program has been in investigation. Absorber Materials Irradiation Rigs (AMIR) are scheduled to be loaded and irradiated in the JOYO MK-II core from 1984. (author)

  19. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  20. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  1. Nuclear power plant control room operators' performance research

    International Nuclear Information System (INIS)

    Gray, L.H.; Haas, P.M.

    1984-01-01

    A research program is being conducted to provide information on the performance of nuclear power plant control room operators when responding to abnormal/emergency events in the plants and in full-scope training simulators. The initial impetus for this program was the need for data to assess proposed design criteria for the choice of manual versus automatic action for accomplishing safety-related functions during design basis accidents. The program also included studies of training simulator capabilities, of procedures and data for specifying and verifying simulator performance, and of methods and applications of task analysis

  2. Graphical programming: On-line robot simulation for telerobotic control

    International Nuclear Information System (INIS)

    McDonald, M.J.; Palmquist, R.D.

    1993-01-01

    Sandia has developed an advanced operational control system approach, caged Graphical Programming, to design and operate robotic waste cleanup and other hazardous duty robotic systems. The Graphical Programming approach produces robot systems that are faster to develop and use, safer in operation, and cheaper overall than altemative teleoperation or autonomous robot control systems. The Graphical Programming approach uses 3-D visualization and simulation software with intuitive operator interfaces for the programming and control of complex robotic systems. Graphical Programming Supervisor software modules allow an operator to command and simulate complex tasks in a graphic preview mode and, when acceptable, command the actual robots and monitor their motions with the graphic system. Graphical Progranuning Supervisors maintain registration with the real world and allow the robot to perform tasks that cannot be accurately represented with models alone by using a combination of model and sensor-based control. This paper describes the Graphical Programming approach, several example control systems that use Graphical Programming, and key features necessary for implementing successful Graphical Programming systems

  3. Angra nuclear plant - environmental control program; Usina Nuclear de Angra: programa de controle ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Kircher, E; Cruz, E.S. da [FURNAS, Rio de Janeiro, RJ (Brazil)

    1990-12-31

    The pre-operational studies, that were elaborated before the beginning of Angra I Power Plant operation, are described in particular the environmental radiological safety area till the fuel loading in the core reactor. Several aspects are included, as socio-economic survey, seismological analysis, Meteorological Program, marine biology, water cooling system, exposure measures of natural radiation, marine sediments characterization in the effluent dispersion area and Environmental Radiological Monitoring Program. The main environmental programs developed for the operational phase of the Angra I Plant are also presented, citing some considerations about the Meteorological Program, Marine Biology Control Program, Temperature and Chlorine Control in Piraquara de Fora Bay, Radiological Environmental Monitoring Program, Sanitary Effluent Control Program and Radiological Emergency Program. (C.G.C.). 2 refs.

  4. Advanced Emissions Control Development Program

    Energy Technology Data Exchange (ETDEWEB)

    A.P.Evans; K.E. Redinger; M.J. Holmes

    1998-04-01

    The objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. Ideally, the project aim is to effectively control air toxic emissions through the use of conventional flue gas cleanup equipment such as electrostatic precipitators (ESPS), fabric filters (baghouse), and wet flue gas desulfurization. Development work to date has concentrated on the capture of mercury, other trace metals, fine particulate and hydrogen chloride. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on the evaluation of mercury and several other air toxics emissions. The AECDP is jointly funded by the United States Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (oCDO), and Babcock& Wilcox-a McDermott company (B&W).

  5. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    2001-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  6. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    1999-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  7. A remotely controlled CCTV system for nuclear reactor retube operations

    International Nuclear Information System (INIS)

    Stovman, J.A.

    1984-01-01

    This paper describes the CCTV Vault Observation Subsystem (VOS) under development for Ontario Hydro for the Pickering 'A' Nuclear Power Plant Large Scale Retubing program. This subsystem will be used by a supervisor and several operators to observe fuel channel replacement operations following plant shutdown and removal of the fuel bundles. VOS basically comprises 23 monochrome television camera driven circuits, a matrix switcher, 15 monitors, 9 tape recorders and 4 microphone driven sound circuits. Remote control of the camera's zoom lenses and mounts is via a digitally multiplexed control system. Design considerations include viewing requirements, reliability, radiation, redundance, and economic factors

  8. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  9. Stress, performance, and control room operations

    International Nuclear Information System (INIS)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies

  10. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  11. Radiological control technician: Training program management manual

    International Nuclear Information System (INIS)

    1992-10-01

    This manual defines and describes the DOE Radiological Control Technician Core Training Program qualification and training process, material development requirements, standards and policies, and administration. The manual applies to Radiological Control Technician Training Programs at all DOE contractor sites

  12. An improved instrument setpoint control program

    International Nuclear Information System (INIS)

    Cash, J.S. Jr.; George, R.T.; Kincaid, S.C.

    1991-01-01

    Instrument setpoints have a definite and often significant impact on plant safety, reliability, and availability. Although typically overshadowed by plant design, modification, and physical change activities, instrument setpoints can alter plant status and system operating characteristics just as significantly. Recognizing the need for a formal program that provides configuration control of instrument setpoints, provides a readily accessible and clearly documented basis for instrument setpoints, and integrates and coordinates operations, engineering, and maintenance activities that influence the basis for instrument setpoints, Philadelphia Electric Company (PECo) is developing an Improved Instrument Setpoint Control Program (IISCP) that incorporates current industry guidance and practices and state-of-the-art information systems technology. The IISCP was designed around PECo's then existing business processes for setpoint control, determination, and maintenance. A task force representing the various constituencies from both plants and the engineering and services organizations were formed to identify objectives and design features for the IISCP. Utilizing industry standards and guidance, regulatory documents, the experiences and good practices obtained from other utilities, and PECo's nuclear group strategies, objectives, and goals, specific objectives were identified to enhance the business processes

  13. Initial operation of NSTX with plasma control

    International Nuclear Information System (INIS)

    Gates, D.; Bell, M.; Ferron, J.; Kaye, S.; Menard, J.; Mueller, D.; Neumeyer, C.; Sabbagh, S.

    2000-01-01

    First plasma, with a maximum current of 300kA, was achieved on NSTX in February 1999. These results were obtained using preprogrammed coil currents. The first controlled plasmas on NSTX were made starting in August 1999 with the full 1MA plasma current achieved in December 1999. The controlled quantities were plasma position (R, Z) and current (Ip). Variations in the plasma shape are achieved by adding preprogrammed currents to those determined by the control parameters. The control system is fully digital, with plasma position and current control, data acquisition, and power supply control all occurring in the same four-processor real time computer. The system uses the PCS (Plasma Control Software) system designed at General Atomics. Modular control algorithms, specific to NSTX, were written and incorporated into the PCS. The application algorithms do the actual control calculations, with the PCS handling data passing. The control system, including planned upgrades, will be described, along with results of the initial controlled plasma operations. Analysis of the performance of the control system will also be presented

  14. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  15. Metra operations management development program : 2010 - 2015.

    Science.gov (United States)

    2016-11-04

    On behalf of the Urban Transportation Center, the University of Illinois (UIC) Great Cities Institute (GCI) provided curriculum development and training services to Metra for a workforce education program targeted to new and experienced managers. Met...

  16. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  17. The Effects of International Operations on the Relationship Between Manufacturing Improvement Programs and Operational Performance

    DEFF Research Database (Denmark)

    Matyusz, Zsolt; Demeter, Krisztina; Boer, Harry

    The link between manufacturing programs and operational performance, and the effects of company internal and external factors on that relationship, are well studied in the literature, both theoretically and empirically. However, previous studies rarely took into account how the scope of operations...... of the business unit affects the relationship between manufacturing programs and performances. We investigate the scope of operations from the manufacturing perspective (i.e. companies that manufacture in only one country have narrow scope of operations, while companies that manufacture in more than one country...... have broad scope of operations). We apply structural equation modelling (SEM) using PLS path modelling to investigate the effect of scope of operations on the relationship between manufacturing improvement programs and operational performance. Manufacturing improvement programs are programs like...

  18. Advanced Control Test Operation (ACTO) facility

    International Nuclear Information System (INIS)

    Ball, S.J.

    1987-01-01

    The Advanced Control Test Operation (ACTO) project, sponsored by the US Department of Energy (DOE), is being developed to enable the latest modern technology, automation, and advanced control methods to be incorporated into nuclear power plants. The facility is proposed as a national multi-user center for advanced control development and testing to be completed in 1991. The facility will support a wide variety of reactor concepts, and will be used by researchers from Oak Ridge National Laboratory (ORNL), plus scientists and engineers from industry, other national laboratories, universities, and utilities. ACTO will also include telecommunication facilities for remote users

  19. Role of operator response guidelines in CANDU 9 design program

    International Nuclear Information System (INIS)

    Jaitly, R.K.

    2000-01-01

    The CANDU 9 is a large version of the CANDU Pressurized Heavy Water Reactor (PHWR) system developed in Canada. With an electrical output of approximately 935 MWe, the CANDU 9 complements the established mid-size CANDU 6 (700 MWe) and makes use of proven technology updated with state of the art features resulting from ongoing development. The CANDU 9 builds on the reactor and process system designs of the operating Darlington and Bruce B plants, and incorporates a modified CANDU 6 station layout, as well as improved construction methods and operational features. A high level of standardization has always been a feature of CANDU reactors. This theme is emphasized in the CANDU 9; all key components (reactor core, steam generators, coolant pumps, pressure tubes, etc.) are of the same design as those proven in service in the operating CANDU power stations. Including Probabilistic Safety Assessment (PSA) as part of the CANDU 9 design process from the outset of the program was seen as key to ensuring completeness of safety related requirements. The PSA work provided an in-depth understanding of the plant response to various postulated accidents. As well, the time frame for recovery and the related operator actions were identified. This information together with AECL's experience in supporting the development of Emergency Operating Procedures (EOPs) for the operating CANDU reactors are the basis for preparation of CANDU 9 Operator Response Guidelines (ORGs). Technical content, format and human factors considerations adopted for the ORGs are such that these can be readily converted to EOPs. The scope of ORGs includes generic as well as event specific ORGs. This dual approach is required to provide defense-in-depth. This paper describes the process used to prepare ORGs for the CANDU 9 reactor and discusses important benefits gained from the application of ORGs as input to the control center design and future preparation of the EOPs. (author)

  20. Operator interface to the ORIC control system

    International Nuclear Information System (INIS)

    Ludemann, C.A.; Casstevens, B.J.

    1983-01-01

    The Oak Ridge Isochronous Cyclotron (ORIC) was built in the early 1960s with a hard-wired manual control system. Presently, it serves as a variable-energy heavy-ion cyclotron with an internal ion source, or as an energy booster for the new 25 MV tandem electrostatic accelerator of the Holifield Heavy Ion Facility. One factor which has kept the cyclotron the productive research tool it is today is the gradual transfer of its control functions to a computer-based system beginning in the 1970s. This particular placement of a computer between an accelerator and its operators afforded some unique challenges and opportunities that would not be encountered today. Historically, the transformation began at a time when computers were just beginning to gain acceptance as reliable operational tools. Veteran operators with tens of years of accelerator experience justifiably expressed skepticism that this improvement would aid them, particularly if they had to re-learn how to operate the machine. The confidence of the operators was gained when they realized that one of the primary principles of ergonomics was being upheld. The computer software and hardware was being designed to serve them and not the computer

  1. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  2. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  3. Management and Operational Control of Criticality

    Energy Technology Data Exchange (ETDEWEB)

    Daniels, J. T. [Authority Health and Safety Branch, United Kingdom Atomic Energy Authority, Risley, Lancs. (United Kingdom)

    1966-05-15

    The evidence of the six process criticality accidents that have been reported to date shows that, without exception, they have been due to the failure of operational controls. In no instance has a criticality accident in processing been due to the use of wrong data 01 inaccurate calculation. Criticality accidents are least likely to occur in the production stream and are more likely to be associated with ancillary equipment and operations. Important as correct criticality calculations are, there are many other considerations which require the exercise of judgement in establishing the operational environment. No operation involving fissile material should be permitted without a formal review resulting in a documented statement of (a) the environmental assessment, (b) the nuclear safety arguments which demonstrate safety under that environment, and (c) the operational requirements which will ensure the validity of (b) under the conditions of (a). To ensure the continued viability of the environmental assessment and the continued reliability of clearance conditions there should be close supervision by operating management, and periodic checks made by site nuclear safety staff. Additionally, there should be periodic and systematic examinations by competent persons who are not responsible to the overall management of the site. (author)

  4. ORNL Pocket Meter Program: internal operating procedures

    International Nuclear Information System (INIS)

    Berger, C.D.; Miller, J.H.; Dunsmore, M.R.

    1984-12-01

    The ORNL Pocket Meter Program is designed for auditing the approximate photon radiation exposure of Oak Ridge National Laboratory (ORNL) radiation workers. Although pocket meters are considered to be a secondary personnel dosimetry system at ORNL, they are valuable indicators of unplanned exposures if proper procedures are followed for testing, calibrating, deploying, wearing, processing, and recording data. 4 figures, 1 table

  5. Intelligent systems supporting the control room operators

    International Nuclear Information System (INIS)

    Berger, E.

    1997-01-01

    The operational experience obtained with the various applications of the systems discussed in this paper shows that more consequent use of the systems will make detection and management of disturbances still more efficient and faster. This holds true both for a low level of process automation and for power plants with a high level of automation. As for conventional power plants, the trend clearly is towards higher degrees of automation and consequent application of supporting systems. Thus, higher availability and rapid failure management are achieved, at low effects on normal operation. These systems are monitoring and process control systems, expert systems, and systems for optimal use of the equipment, or systems for post-incident analyses and computer-assisted on-shift protocols, or operating manuals. (orig./CB) [de

  6. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  7. Skill retention and control room operator competency

    International Nuclear Information System (INIS)

    Stammers, R.B.

    1981-12-01

    The problem of skill retention in relation to the competency of control room operators is addressed. Although there are a number of related reviews of the literature, this particular topic has not been examined in detail before. The findings of these reviews are summarised and their implications for the area discussed. The limited research on skill retention in connection with process control is also reviewed. Some topics from cognitive and instructional psychology are also raised. In particular overlearning is tackled and the potential value of learning strategies is assessed. In conclusion the important topic of measurement of performance is introduced and a number of potentially valuable training approaches are outlined. (author)

  8. Space Telescope Control System science user operations

    Science.gov (United States)

    Dougherty, H. J.; Rossini, R.; Simcox, D.; Bennett, N.

    1984-01-01

    The Space Telescope science users will have a flexible and efficient means of accessing the capabilities provided by the ST Pointing Control System, particularly with respect to managing the overal acquisition and pointing functions. To permit user control of these system functions - such as vehicle scanning, tracking, offset pointing, high gain antenna pointing, solar array pointing and momentum management - a set of special instructions called 'constructs' is used in conjuction with command data packets. This paper discusses the user-vehicle interface and introduces typical operational scenarios.

  9. Bisimulations for Delimited-Control Operators

    OpenAIRE

    Biernacki , Dariusz; Lenglet , Sergueï; Polesiuk , Piotr

    2017-01-01

    We propose a survey of the behavioral theory of an untyped lambda-calculus extended with the delimited-control operators shift and reset. We define a contextual equivalence for this calculus, that we then aim to characterize with coinductively defined relations, called bisimilarities. We study different styles of bisimilarities (namely applicative, normal form, and environmental), and we give several examples to illustrate their respective strengths and weaknesses. We also discuss how to exte...

  10. Control Transfer in Operating System Kernels

    Science.gov (United States)

    1994-05-13

    microkernel system that runs less code in the kernel address space. To realize the performance benefit of allocating stacks in unmapped kseg0 memory, the...review how I modified the Mach 3.0 kernel to use continuations. Because of Mach’s message-passing microkernel structure, interprocess communication was...critical control transfer paths, deeply- nested call chains are undesirable in any case because of the function call overhead. 4.1.3 Microkernel Operating

  11. Integrated initial training program for a CEGB operations engineer

    International Nuclear Information System (INIS)

    Tompsett, P.A.

    1987-01-01

    This paper considers the overall training programs undertaken by a newly appointed Operations Engineer at one of the Central Electricity Generating Board's (CEGB) Advanced Gas Cooled Reactor (AGR) nuclear power stations. The training program is designed to equip him with the skills and knowledge necessary for him to discharge his duties safely and effectively. In order to assist the learning process and achieve and integrated program, aspects of reactor technology and operation, initially the subject of theoretical presentations at the CEGB's Nuclear Power Training Center (NPTC) are reinforced by either simulation and/or practical experience on site. In the later stages plant-specific simulators, operated by trained tutors, are incorporated into the training program to provide the trainee with practical experience of plant operation. The trainee's performance is assessed throughout the program to provide feedback to the trainee, the trainers and station management

  12. Material operating behaviour of ABB BWR control rods

    International Nuclear Information System (INIS)

    Rebensdorff, B.; Bart, G.

    2000-01-01

    The BWR control rods made by ABB use boron carbide (B 4 C and hafnium as absorber material within a cladding of stainless steel. The general behaviour under operation has proven to be very good. ABB and many of their control rod customers have performed extensive inspection programs of control rod behaviour. However, due to changes in the material properties under fast and thermal neutron irradiation defects may occur in the control rods at high neutron fluences. Examinations of irradiated control rod materials have been performed in hot cell laboratories. The examinations have revealed the defect mechanism Irradiation Assisted Stress Corrosion Cracking (IASCC) to appear in the stainless steel cladding. For IASCC to occur three factors have to act simultaneously. Stress, material sensitization and an oxidising environment. Stress may be obtained from boron carbide swelling due to irradiation. Stainless steel may be sensitized to intergranular stress corrosion cracking under irradiation. Normally the reactor environment in a BWR is oxidising. The presentation focuses on findings from hot cell laboratory work on irradiated ABB BWR control rods and studies of irradiated control rod materials in the hot cells at PSI. Apart from physical, mechanical and microstructural examinations, isotope analyses were performed to describe the local isotopic burnup of boron. Consequences (such as possible B 4 C washout) of a under operation in a ABB BWR, after the occurrence of a crack is discussed based on neutron radiographic examinations of control rods operated with cracks. (author)

  13. Monitoring control program as a tool for regulatory control

    International Nuclear Information System (INIS)

    Silva Peres, Sueli da; Lauria, Dejanaira C.; Martins, Nadia S.F.; Rio, Monica A.P.

    2008-01-01

    Full text: The Institute of Radiation Protection and Dosimetry (IRD) of the Brazilian Commission of Nuclear Energy (CNEN) is responsible for developing, establishing and carrying out an independent assessment to verify the adequacy, effectiveness and accuracy of environmental radiological control carried out by licensed and controlled facilities. This independent assessment is performed by Environmental Monitoring Control Program (MCP). The MCP is a regulatory control and its main goal is to provide public and environment with an appropriate protection level against harmful effects of ionising radiation. The main purpose of the MCP is to verify whether applicable requirements prescribed by legislation are met, the environmental radiological control of the facilities are adequate and effective and the facilities are able to generate valid measuring results. The MCP is carried out in order to evaluate the quality of environmental radiation monitoring programs (EMP) and the effectiveness of their implementation, sampling conditions in the field, changes of environmental aspects in the impact area, adequacy of and adherence to procedures established and other applicable documents, technical competence of the staff and the necessary resources to ensure the required quality of the EMP. The MCP has been performed by activities should include inspecting and auditing of several types of nuclear and radioactive facilities. The inspection programme include the joint sampling program (CCP). The aim of the CCP is to check data of environmental monitoring of operator. The MCP was implemented in 1994. Ever since several problems related to the environmental control performed by operator was identified. The most important of them include problems related to the preparation and analysis of environmental samples, training of personnel, necessary resources, adherence of procedures to the purpose of the monitoring, fulfillment of procedures established, adequacy of the EMP and EMP

  14. 21 CFR 111.127 - What quality control operations are required for packaging and labeling operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.127 What quality control operations are required for packaging and labeling operations? Quality control operations for packaging and...

  15. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  16. Reactor operations, inspection and maintenance. PNGS Calibration Program

    International Nuclear Information System (INIS)

    Lopez, E.

    1997-01-01

    The PNGS Calibration Program is being implemented as a response to various concerns identified in recent PEER evaluations and AECB audits. Identified areas of concern were the approach to instrument calibration of Special Safety Systems (SSS). The implementation of a calibration program is a significant improvement in operating practices. A systematic and comprehensive approach to calibration of instrumentation will improve the quality of operation of the plant with a positive contribution to PNGS safety of operation and economic objectives. This paper describes the strategy to implement the proposed calibration program and describes its calibration data requirements. (DM)

  17. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  18. Contextual control of discriminated operant behavior.

    Science.gov (United States)

    Bouton, Mark E; Todd, Travis P; León, Samuel P

    2014-01-01

    Previous research has suggested that changing the context after instrumental (operant) conditioning can weaken the strength of the operant response. That result contrasts with the results of studies of Pavlovian conditioning, in which a context switch often does not affect the response elicited by a conditioned stimulus. To begin to make the methods more similar, Experiments 1-3 tested the effects of a context switch in rats on a discriminated operant response (R; lever pressing or chain pulling) that had been reinforced only in the presence of a 30-s discriminative stimulus (S; tone or light). As in Pavlovian conditioning, responses and reinforcers became confined to presentations of the S during training. However, in Experiment 1, after training in Context A, a switch to Context B caused a decrement in responding during S. In Experiment 2, a switch to Context B likewise decreased responding in S when Context B was equally familiar, equally associated with reinforcement, or equally associated with the training of a discriminated operant (a different R reinforced in a different S). However, there was no decrement if Context B had been associated with the same response that was trained in Context A (Experiments 2 and 3). The effectiveness of S transferred across contexts, whereas the strength of the response did not. Experiment 4 found that a continuously reinforced response was also disrupted by context change when the same response manipulandum was used in both training and testing. Overall, the results suggest that the context can have a robust general role in the control of operant behavior. Mechanisms of contextual control are discussed.

  19. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  20. Independent auto evaluation of an operative radiological protection program

    International Nuclear Information System (INIS)

    Medrano L, M.A.; Rodriguez C, C.C.; Linares R, D.; Zarate M, N.; Zempoalteca B, R.

    2006-01-01

    The program of operative radiological protection of a nuclear power plant consists of multiple procedures and associate tasks that have as purpose the radiological protection of the workers of the power station. It is for this reason that the constant evaluation of the one it programs it is an important tool in the identification of their weaknesses (and strengths), so they can be assisted appropriately. In this work the main elements of the program of independent auto evaluation of the program of operative radiological protection of the Laguna Verde Central that has been developed and implemented by the National Institute of Nuclear Research are described. (Author)

  1. Programming languages and operating systems used in data base systems

    International Nuclear Information System (INIS)

    Radulescu, T.G.

    1977-06-01

    Some apsects of the use of the programming languages and operating systems in the data base systems are presented. There are four chapters in this paper. In the first chapter we present some generalities about the programming languages. In the second one we describe the use of the programming languages in the data base systems. A classification of the programming languages used in data base systems is presented in the third one. An overview of the operating systems is made in the last chapter. (author)

  2. Programming for controlling of pulse radiolysis setup. Program RADIO96

    International Nuclear Information System (INIS)

    Mirkowski, J.; Grodkowski, J.

    1998-01-01

    Program RADIO96 was written in Pascal using DELPHI 1.0 (Borland) programming platform. It can operate on IBM PC compatible computers in WINDOWS 3x or WINDOWS'95 environment. The program is dedicated to the pulse radiolysis setup based on the linear electron accelerator LAE 13/9 of the Department of Radiation Chemistry and Technology of the INCT. This work was based on apparatus and results described before and also on programming manuals of used equipment and technical data of programming platform. (author)

  3. Chapter 8: Plasma operation and control

    Science.gov (United States)

    ITER Physics Expert Group on Disruptions, Control, Plasma, and MHD; ITER Physics Expert Group on Energetic Particles, Heating, Current and Drive; ITER Physics Expert Group on Diagnostics; ITER Physics Basis Editors

    1999-12-01

    Wall conditioning of fusion devices involves removal of desorbable hydrogen isotopes and impurities from interior device surfaces to permit reliable plasma operation. Techniques used in present devices include baking, metal film gettering, deposition of thin films of low-Z material, pulse discharge cleaning, glow discharge cleaning, radio frequency discharge cleaning, and in situ limiter and divertor pumping. Although wall conditioning techniques have become increasingly sophisticated, a reactor scale facility will involve significant new challenges, including the development of techniques applicable in the presence of a magnetic field and of methods for efficient removal of tritium incorporated into co-deposited layers on plasma facing components and their support structures. The current status of various approaches is reviewed, and the implications for reactor scale devices are summarized. Creation and magnetic control of shaped and vertically unstable elongated plasmas have been mastered in many present tokamaks. The physics of equilibrium control for reactor scale plasmas will rely on the same principles, but will face additional challenges, exemplified by the ITER/FDR design. The absolute positioning of outermost flux surface and divertor strike points will have to be precise and reliable in view of the high heat fluxes at the separatrix. Long pulses will require minimal control actions, to reduce accumulation of AC losses in superconducting PF and TF coils. To this end, more complex feedback controllers are envisaged, and the experimental validation of the plasma equilibrium response models on which such controllers are designed is encouraging. Present simulation codes provide an adequate platform on which equilibrium response techniques can be validated. Burning plasmas require kinetic control in addition to traditional magnetic shape and position control. Kinetic control refers to measures controlling density, rotation and temperature in the plasma core as

  4. Automation of program model developing for complex structure control objects

    International Nuclear Information System (INIS)

    Ivanov, A.P.; Sizova, T.B.; Mikhejkina, N.D.; Sankovskij, G.A.; Tyufyagin, A.N.

    1991-01-01

    A brief description of software for automated developing the models of integrating modular programming system, program module generator and program module library providing thermal-hydraulic calcualtion of process dynamics in power unit equipment components and on-line control system operation simulation is given. Technical recommendations for model development are based on experience in creation of concrete models of NPP power units. 8 refs., 1 tab., 4 figs

  5. Operating large controlled thermonuclear fusion research facilities

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-01-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. The authors emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities

  6. Human reliability analysis of control room operators

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Isaac J.A.L.; Carvalho, Paulo Victor R.; Grecco, Claudio H.S. [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Human reliability is the probability that a person correctly performs some system required action in a required time period and performs no extraneous action that can degrade the system Human reliability analysis (HRA) is the analysis, prediction and evaluation of work-oriented human performance using some indices as human error likelihood and probability of task accomplishment. Significant progress has been made in the HRA field during the last years, mainly in nuclear area. Some first-generation HRA methods were developed, as THERP (Technique for human error rate prediction). Now, an array of called second-generation methods are emerging as alternatives, for instance ATHEANA (A Technique for human event analysis). The ergonomics approach has as tool the ergonomic work analysis. It focus on the study of operator's activities in physical and mental form, considering at the same time the observed characteristics of operator and the elements of the work environment as they are presented to and perceived by the operators. The aim of this paper is to propose a methodology to analyze the human reliability of the operators of industrial plant control room, using a framework that includes the approach used by ATHEANA, THERP and the work ergonomics analysis. (author)

  7. Operating large controlled thermonuclear fusion research facilities

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-10-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. We emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities. 13 refs., 15 figs., 3 tabs

  8. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  9. 14 CFR 91.1013 - Operational control briefing and acknowledgment.

    Science.gov (United States)

    2010-01-01

    ... Ownership Operations Operational Control § 91.1013 Operational control briefing and acknowledgment. (a) Upon...) Liability risk in the event of a flight-related occurrence that causes personal injury or property damage...

  10. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  11. Developments in operator assistance techniques for nuclear power plant control and operation

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.; Beltranda, G.; Soldermann, R.

    1989-01-01

    This paper describes an approach which has been developed in order to improve nuclear power plants control and monitoring in normal and abnormal situations. These developments take full advantage of the trend towards the computerization of control rooms in industrial continuous processes. This research program consists in a thorough exploration of different information processing techniques, ranking from the rather simple visual synthetization of informations on graphic displays to sophisticated Artificial Intelligence (AI) techniques. These techniques are put into application for the solving of man-machine interface problems in the different domains of plant operation

  12. Intelligent Flight Control Simulation Research Program

    National Research Council Canada - National Science Library

    Stolarik, Brian

    2007-01-01

    ...). Under the program, entitled "Intelligent Flight Control Simulation Research Laboratory," a variety of technologies were investigated or developed during the course of the research for AFRL/VAC...

  13. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant, including decommissioning. (authors)

  14. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    Full text: This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant. (authors)

  15. 26 CFR 601.803 - Program operations and requirements.

    Science.gov (United States)

    2010-04-01

    ... REVENUE PRACTICE STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.803 Program operations... understanding of Federal tax subjects on which they will provide tax return assistance. Volunteers who do not... individuals involved in the program, to respect the confidentiality of income and financial information known...

  16. ENDF/B-V utility programs: description and operating instructions

    International Nuclear Information System (INIS)

    McLaughlin, K.

    1984-03-01

    A description and operating instructions are supplied for the following ENDF/B-V Processing Programs: CHECKER, CRECT, STNDRD, FIZCON, PSYCHE, RESEND, INTER, INTEND, SUMRIZ, PLOTEF, LSTFCV, RIGEL. These programs can be obtained on magnetic tape, free of charge, from the IAEA Nuclear Data Section. (author)

  17. 75 FR 48329 - Tribal Drinking Water Operator Certification Program

    Science.gov (United States)

    2010-08-10

    ... operator has the skills, knowledge, education and experience necessary to deliver safe water supporting... demonstrates the operator has the skills, knowledge, education and experience necessary to deliver safe water... this program can be found at http://www.epa.gov/safewater/tribal.html . 2. Hard Copies. Hard copies of...

  18. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    Melber, B.D.; Saari, L.M.; White, A.S.; Geisendorfer, C.L.; Huenefeld, J.C.

    1986-02-01

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  19. Advanced Emissions Control Development Program: Mercury Control

    International Nuclear Information System (INIS)

    Evans, A.P.; Redinger, K.W.; Holmes, M.J.

    1997-07-01

    McDermott Technology, Inc. (a subsidiary of Babcock ampersand Wilcox) is conducting the Advanced Emissions Control Development Project (AECDP) which is aimed at the development of practical, cost-effective strategies for reducing the emissions of hazardous air pollutants (HAPS) from coal-fired electric utility plants. The need for such controls may arise as the US Environmental Protection Agency (EPA) proceeds with implementation of requirements set forth in the Clean Air Act Amendments (CAAA's) of 1990. Promulgation of air toxics emissions regulations for electric utility plants could dramatically impact utilities burning coal, their industrial and residential customers, and the coal industry. AECDP project work will supply the information needed by utilities to respond to potential HAPs regulations in a timely, cost-effective, enviromnentally-sound manner which supports the continued use of the Nation's abundant reserves of coal, such as those in the State of Ohio. The development work is being carried out using the 10 MW Clean Environment Development Facility wherein air toxics emissions control strategies can be developed under controlled conditions. The specific objectives of the project are to (1) measure and understand production and partitioning of air toxics species for a variety of coals, (2) optimize the air toxics removal performance of conventional flue gas cleanup systems, (3) develop advanced air toxics emissions control concepts, (4) develop and validate air toxics emissions measurement and monitoring techniques, and (5) establish a comprehensive, self-consistent air toxics data library. This project is supported by the Department of Energy, the Ohio Coal Development Office within the Ohio Department of Development and Babcock ampersand Wilcox. A comprehensive assessment of HAP emissions from coal-fired electric utility boilers sponsored by the Department of Energy and the Electric Power Research Institute concluded that with the exception of

  20. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  1. Operating experience with the new TRIUMF RF control system

    International Nuclear Information System (INIS)

    Fong, K.; Laverty, M.; Fang, S.

    1995-06-01

    The 23 MHz rf control of the TRIUMF cyclotron has been replaced by a new VXI control system based on digital signal processing. It provides amplitude and phase regulation of the cyclotron dee voltage, as well as other functions such as power-up sequencing, spark and high VSWR protection. Modularity of the hardware is achieved by the VXI architecture, and in the software by Object Oriented Programming. It is expected that this will result in a considerably longer MTBF, and shorter fault diagnosis and repair times, than the equipment it replaces. The new system has now been in operation for over two months. The results of commissioning, testing, and early operating experience are presented. (author). 4 refs., 5 figs

  2. Expert systems in power substation operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Guilherme Moutinho; Lambert-Torres, Germano; Silva, Alexandre P. Alves da [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    With digital technology being increasingly adopted in power substations (SE), perspectives are created for integration of supervision, control and protection systems in addition to making its process automation feasible. Once a SE is digitalized, the systems which previously were implemented physically will be able to be implemented by means of computer programs (software), allowing the expansion of its scope of operation. Studies and research performed at the international level have pointed to the utilization of Expert Systems (ES) as a more suitable alternative for representation and solution of the operation and control problems, especially those which do not have an established theory, which are provided with diagnosis characteristics and that associate themselves with fuzzy data and information. (author) 4 refs., 3 figs.

  3. Process control upgrades yield huge operational improvements

    International Nuclear Information System (INIS)

    Fitzgerald, W.V.

    2001-01-01

    Most nuclear plants in North America were designed and built in the late 60 and 70. The regulatory nature of this industry over the years has made design changes at the plant level difficult, if not impossible, to implement. As a result, many plants in this world region have been getting by on technology that is over 40 years behind the times. What this translates into is that the plants have not been able to take advantage of the huge technology gains that have been made in process control during this period. As a result, most of these plants are much less efficient and productive than they could be. One particular area of the plant that is receiving a lot of attention is the feedwater heaters. These systems were put in place to improve efficiency, but most are not operating correctly. This paper will present a case study where one progressive mid-western utility decided that enough was enough and implemented a process control audit of their heater systems. The audit clearly pointed out the existing problems with the current process control system. It resulted in a proposal for the implementation of a state of the art, digital distributed process control system for the heaters along with a complete upgrade of the level controls and field devices that will stabilize heater levels, resulting in significant efficiency gains and lower maintenance bills. Overall the payback period for this investment should be less than 6 months and the plant is now looking for more opportunities that can provide even bigger gains. (author)

  4. Guided Synthesis of Control Programs Using UPPAAL

    DEFF Research Database (Denmark)

    Hune, T.; Larsen, Kim Guldstrand; Pettersson, P.

    2000-01-01

    the transitions with extra guards. Applying this technique have made synthesis of control programs feasible for a plant producing as many as 60 batches. In comparison, we could only handle plants producing two batches without using guides. The synthesized control programs have been executed in a physical plant...

  5. Measurement control program at model facility

    International Nuclear Information System (INIS)

    Schneider, R.A.

    1984-01-01

    A measurement control program for the model plant is described. The discussion includes the technical basis for such a program, the application of measurement control principles to each measurement, and the use of special experiments to estimate measurement error parameters for difficult-to-measure materials. The discussion also describes the statistical aspects of the program, and the documentation procedures used to record, maintain, and process the basic data

  6. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  7. Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the 2-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These 2 programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  8. 46 CFR 196.85-1 - Magazine operation and control.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Magazine operation and control. 196.85-1 Section 196.85... OPERATIONS Magazine Control § 196.85-1 Magazine operation and control. (a) Keys to magazine spaces and magazine chests shall be kept in the sole control or custody of the Master or one delegated qualified...

  9. Operating program for an automatic alpha-beta counting system-FAG

    International Nuclear Information System (INIS)

    German, U.; Levinson, L.; Shemesh, Y.; Peled, O.; Weistein, M.

    1996-01-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department's laboratory of the NRCN. The system consists of a proportional detector of 8'' diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors)

  10. Operating program for an automatic alpha-beta counting system-FAG

    Energy Technology Data Exchange (ETDEWEB)

    German, U; Levinson, L; Shemesh, Y; Peled, O; Weistein, M [Israel Atomic Energy Commission, Beersheba (Israel). Nuclear Research Center-Negev

    1996-12-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department`s laboratory of the NRCN. The system consists of a proportional detector of 8`` diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors).

  11. Symbol generators with program control

    International Nuclear Information System (INIS)

    Gryaznov, V.M.; Tomik, J.

    1974-01-01

    Methods of constructing symbol generators are described which ensure a program variation of symbol shape and setup. The symbols are formed on the basis of a point microraster. A symbol description code contains information on a symbol shape, with one digit corresponding to each microraster element. For a microraster discrete by-pass the description code is transformed into succession of illuminating pulses by means of a shift register

  12. Program-execution in the computer operating-system VORTEX-I

    International Nuclear Information System (INIS)

    Borrmann, H.

    1976-06-01

    Comprehensive German introduction to the structure and operation of a relatively comfortable realtime operating system for process control by VORTEX-I for the V73 of the VARIAN-Company. This is a disc oriented single user system with parallel foreground and background operation. The complete organization of the system-nucleus is described (for input/output exists a separate external report). To the more experienced user of the V73 the existing facilities of interacting with the operating system (operator commands, interrupts and program calls) are exactly described regarding to their internal working. (orig./WB) [de

  13. Maryland controlled fusion research program

    International Nuclear Information System (INIS)

    Griem, H.R.; Liu, C.S.

    1992-01-01

    In this paper, we summarize the technical progress in four major areas of tokamak research: (a) L/H transition and edge turbulence and transport; (b) active control of microturbulence and transport; (c) major disruptions; and (d) the sawtooth crash

  14. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    Energy Technology Data Exchange (ETDEWEB)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad; Gehrig, Bruce; Lu, Na

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department of Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following

  15. AE-C attitude determination and control prelaunch analysis and operations plan

    Science.gov (United States)

    Werking, R. D.; Headrick, R. D.; Manders, C. F.; Woolley, R. D.

    1973-01-01

    A description of attitude control support being supplied by the Mission and Data Operations Directorate is presented. Included are descriptions of the computer programs being used to support the missions for attitude determination, prediction, and control. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

  16. A quality control program for radiation sources

    International Nuclear Information System (INIS)

    Almeida, C.E. de; Sibata, C.H.; Cecatti, E.R.; Kawakami, N.S.; Alexandre, A.C.; Chiavegatti Junior, M.

    1982-01-01

    An extensive quality control program was established covering the following areas: physical parameters of the therapeutical machines, dosimetric standards, preventive maintenance of radiation sources and measuring instruments. A critical evaluation of this program was done after two years (1977-1979) of routine application and the results will be presented. The fluctuation on physical parameters strongly supports the efforts and cost of a quality control program. This program has certainly improved the accuracy required on the delivery of the prescribed dose for radiotherapy treatment. (Author) [pt

  17. CT dosimetry and quality control of its operation

    International Nuclear Information System (INIS)

    Mechi, Saida

    2011-01-01

    This thesis focuses on the dosimetry of a scanner, quality control of its operations and the development of a protocol. It allowed us the mastery of the art scanner and participation in all quality controls with appropriate ghosts. CT is a radiographic examination sophisticated and accurate, widely used to screen for various diseases, among other cancer. We worked on the dosimetry of a scanner and we have made simulations with a program called Impact that calculates the CT CTDI and the PDL and compared with values displayed on the console. Similarly, the software calculates the absorbed dose and compared with that calculated by Caldose X. This work is complemented by the development of a protocol with the quality control procedures of the image and dosimetry in chronological order.

  18. Control system user interface for accelerator commissioning and operation

    International Nuclear Information System (INIS)

    Dobrott, D.; Keeley, D.; Kolte, G.; Mikic, Z.; Lee, M.; Corbett, J.; Howry, S.; King, A.

    1991-01-01

    An Interactive Accelerator Interface Module (AIM) has been developed in a workstation environment for the purposes of assisting in the commissioning and operation of any storage ring/collider system. The function of AIM is to integrate modeling and simulation codes into accelerator and beamline control systems for the purpose of rapid on-line data analysis and error-correction, resulting in significant time-saving. A system dependent module provides for the translation of specific control system data files to appropriate input format for application programs within AIM. Interactive screen graphics, including system function diagrams, menus, beamline element status and update information are standard in AIM. AIM is currently connected to the Stanford Linear Collider (SLC) control system, but is easily transportable to other facilities. This paper describes the development of AIM and its applications on SLC

  19. Achieving High Reliability Operations Through Multi-Program Integration

    Energy Technology Data Exchange (ETDEWEB)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  20. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  1. Inpo programs for improvement of nuclear power plant operations

    International Nuclear Information System (INIS)

    Edward Moore, C.

    1989-01-01

    The talk shows how key INPO programs help foster improved nuclear power operations. The talk focuses on the results being seen from six key efforts: evaluations, training and accreditation, assistance, events analysis and information exchange, human performance and maintenance. The talk stresses that all INPO programs are geared toward enhanced performance and that progress in key performance areas since 1980 shows that INPO and U.S. industry efforts are achieving desired results

  2. Measurement control program for nuclear material accounting

    International Nuclear Information System (INIS)

    Brouns, R.J.; Roberts, F.P.; Merrill, J.A.; Brown, W.B.

    1980-06-01

    A measurement control program for nuclear material accounting monitors and controls the quality of the measurments of special nuclear material that are involved in material balances. The quality is monitored by collecting data from which the current precision and accuracy of measurements can be evaluated. The quality is controlled by evaluations, reviews, and other administrative measures for control of selection or design of facilities, equipment and measurement methods and the training and qualification of personnel who perform SNM measurements. This report describes the most important elements of a program by which management can monitor and control measurement quality

  3. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  4. Development of the automatic control rod operation system for JOYO. Verification of automatic control rod operation guide system

    International Nuclear Information System (INIS)

    Terakado, Tsuguo; Suzuki, Shinya; Kawai, Masashi; Aoki, Hiroshi; Ohkubo, Toshiyuki

    1999-10-01

    The automatic control rod operation system was developed to control the JOYO reactor power automatically in all operation modes(critical approach, cooling system heat up, power ascent, power descent), development began in 1989. Prior to applying the system, verification tests of the automatic control rod operation guide system was conducted during 32nd duty cycles of JOYO' from Dec. 1997 to Feb. 1998. The automatic control rod operation guide system consists of the control rod operation guide function and the plant operation guide function. The control rod operation guide function provides information on control rod movement and position, while the plant operation guide function provide guidance for plant operations corresponding to reactor power changes(power ascent or power descent). Control rod insertion or withdrawing are predicted by fuzzy algorithms. (J.P.N.)

  5. Validation of a proposal for evaluating hospital infection control programs.

    Science.gov (United States)

    Silva, Cristiane Pavanello Rodrigues; Lacerda, Rúbia Aparecida

    2011-02-01

    To validate the construct and discriminant properties of a hospital infection prevention and control program. The program consisted of four indicators: technical-operational structure; operational prevention and control guidelines; epidemiological surveillance system; and prevention and control activities. These indicators, with previously validated content, were applied to 50 healthcare institutions in the city of São Paulo, Southeastern Brazil, in 2009. Descriptive statistics were used to characterize the hospitals and indicator scores, and Cronbach's α coefficient was used to evaluate the internal consistency. The discriminant validity was analyzed by comparing indicator scores between groups of hospitals: with versus without quality certification. The construct validity analysis was based on exploratory factor analysis with a tetrachoric correlation matrix. The indicators for the technical-operational structure and epidemiological surveillance presented almost 100% conformity in the whole sample. The indicators for the operational prevention and control guidelines and the prevention and control activities presented internal consistency ranging from 0.67 to 0.80. The discriminant validity of these indicators indicated higher and statistically significant mean conformity scores among the group of institutions with healthcare certification or accreditation processes. In the construct validation, two dimensions were identified for the operational prevention and control guidelines: recommendations for preventing hospital infection and recommendations for standardizing prophylaxis procedures, with good correlation between the analysis units that formed the guidelines. The same was found for the prevention and control activities: interfaces with treatment units and support units were identified. Validation of the measurement properties of the hospital infection prevention and control program indicators made it possible to develop a tool for evaluating these programs

  6. Distributed Autonomous Control of Multiple Spacecraft During Close Proximity Operations

    National Research Council Canada - National Science Library

    McCamish, Shawn B

    2007-01-01

    This research contributes to multiple spacecraft control by developing an autonomous distributed control algorithm for close proximity operations of multiple spacecraft systems, including rendezvous...

  7. Control room human engineering influences on operator performance

    International Nuclear Information System (INIS)

    Finlayson, F.C.

    1977-01-01

    Three general groups of factors influence operator performance in fulfilling their responsibilities in the control room: (1) control room and control system design, informational data displays (operator inputs) as well as control board design (for operator output); (2) operator characteristics, including those skills, mental, physical, and emotional qualities which are functions of operator selection, training, and motivation; (3) job performance guides, the prescribed operating procedures for normal and emergency operations. This paper presents some of the major results of an evaluation of the effect of human engineering on operator performance in the control room. Primary attention is given to discussion of control room and control system design influence on the operator. Brief observations on the influences of operator characteristics and job performance guides (operating procedures) on performance in the control room are also given. Under the objectives of the study, special emphasis was placed on the evaluation of the control room-operator relationships for severe emergency conditions in the power plant. Consequently, this presentation is restricted largely to material related to emergency conditions in the control room, though it is recognized that human engineering of control systems is of equal (or greater) importance for many other aspects of plant operation

  8. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  9. Operation and control software for APNEA

    Energy Technology Data Exchange (ETDEWEB)

    McClelland, J.H.; Storm, B.H. Jr.; Ahearn, J. [Lockheed-Martin Specialty Components, Largo, FL (United States)] [and others

    1997-11-01

    The human interface software for the Lockheed Martin Specialty Components (LMSC) Active/Passive Neutron Examination & Analysis System (APENA) provides a user friendly operating environment for the movement and analysis of waste drums. It is written in Microsoft Visual C++ on a Windows NT platform. Object oriented and multitasking techniques are used extensively to maximize the capability of the system. A waste drum is placed on a loading platform with a fork lift and then automatically moved into the APNEA chamber in preparation for analysis. A series of measurements is performed, controlled by menu commands to hardware components attached as peripheral devices, in order to create data files for analysis. The analysis routines use the files to identify the pertinent radioactive characteristics of the drum, including the type, location, and quantity of fissionable material. At the completion of the measurement process, the drum is automatically unloaded and the data are archived in preparation for storage as part of the drum`s data signature. 3 figs.

  10. Operation and control software for APNEA

    International Nuclear Information System (INIS)

    McClelland, J.H.; Storm, B.H. Jr.; Ahearn, J.

    1997-01-01

    The human interface software for the Lockheed Martin Specialty Components (LMSC) Active/Passive Neutron Examination ampersand Analysis System (APENA) provides a user friendly operating environment for the movement and analysis of waste drums. It is written in Microsoft Visual C++ on a Windows NT platform. Object oriented and multitasking techniques are used extensively to maximize the capability of the system. A waste drum is placed on a loading platform with a fork lift and then automatically moved into the APNEA chamber in preparation for analysis. A series of measurements is performed, controlled by menu commands to hardware components attached as peripheral devices, in order to create data files for analysis. The analysis routines use the files to identify the pertinent radioactive characteristics of the drum, including the type, location, and quantity of fissionable material. At the completion of the measurement process, the drum is automatically unloaded and the data are archived in preparation for storage as part of the drum's data signature. 3 figs

  11. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  12. Extraction of Static and Dynamic Reservoir Operation Rules by Genetic Programming

    Directory of Open Access Journals (Sweden)

    Habib Akbari Alashti

    2014-11-01

    Full Text Available Considering the necessity of desirable operation of limited water resources and assuming the significant role of dams in controlling and consuming the surface waters, highlights the advantageous of suitable operation rules for optimal and sustainable operation of dams. This study investigates the hydroelectric supply of a one-reservoir system of Karoon3 using nonlinear programming (NLP, genetic algorithm (GA, genetic programming (GP and fixed length gen GP (FLGGP in real-time operation of dam considering two approaches of static and dynamic operation rules. In static operation rule, only one rule curve is extracted for all months in a year whereas in dynamic operation rule, monthly rule curves (12 rules are extracted for each month of a year. In addition, nonlinear decision rule (NLDR curves are considered, and the total deficiency function as the target (objective function have been used for evaluating the performance of each method and approach. Results show appropriate efficiency of GP and FLGGP methods in extracting operation rules in both approaches. Superiority of these methods to operation methods yielded by GA and NLP is 5%. Moreover, according to the results, it can be remarked that, FLGGP method is an alternative for GP method, whereas the GP method cannot be used due to its limitations. Comparison of two approaches of static and dynamic operation rules demonstrated the superiority of dynamic operation rule to static operation rule (about 10% and therefore this method has more capabilities in real-time operation of the reservoirs systems.

  13. Traffic Control Device Evaluation Program : FY 2017

    Science.gov (United States)

    2018-03-01

    This report presents findings on the activities conducted in the Traffic Control Device Evaluation Program during the 2017 fiscal year. The research on sponsored changeable message signs (continued from the previous year) was terminated by the Federa...

  14. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  15. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  16. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  17. Operations Management in the Design and Execution of MBA Programs

    Science.gov (United States)

    Busing, Michael E.; Palocsay, Susan W.

    2016-01-01

    Master of business administration (MBA) programs are under intense pressure to improve efficiencies, lower tuition, and offer refreshed curriculum that is of high quality and regarded as relevant by the marketplace. In light of this environment, the authors propose a conceptual framework for effectively employing operations management (OM)…

  18. Modules program structures and the structuring of operating systems

    NARCIS (Netherlands)

    Bron, C.; Duijvestijn, W.; Lockemann, P.C.

    1981-01-01

    In this paper some views are presented on the way in which complex systems, such as Operating Systems and the programs to be interfaced with them can be constructed, and how such systems may become heavily library oriented. Although such systems have a dynamic nature, all interfacing within and

  19. Automatic control of commercial computer programs

    International Nuclear Information System (INIS)

    Rezvov, B.A.; Artem'ev, A.N.; Maevskij, A.G.; Demkiv, A.A.; Kirillov, B.F.; Belyaev, A.D.; Artem'ev, N.A.

    2010-01-01

    The way of automatic control of commercial computer programs is presented. The developed connection of the EXAFS spectrometer automatic system (which is managed by PC for DOS) is taken with the commercial program for the CCD detector control (which is managed by PC for Windows). The described complex system is used for the automation of intermediate amplitude spectra processing in EXAFS spectrum measurements at Kurchatov SR source

  20. Application of fuzzy logic operation and control to BWRs

    International Nuclear Information System (INIS)

    Junichi Tanji; Mitsuo Kinoshita; Takaharu Fukuzaki; Yasuhiro Kobayashi

    1993-01-01

    Fuzzy logic control schemes employing linguistic decision rules for flexible operator control strategies have undergone application tests in dynamic systems. The advantages claimed for fuzzy logic control are its abilities: (a) to facilitate direct use of skillful operator know-how for automatic operation and control of the systems and (b) to provide robust multivariable control for complex plants. The authors have also studied applications of fuzzy logic control to automatic startup operations and load-following control in boiling water reactors, pursuing these same advantages

  1. Intelligent process control operator aid -- An artificial intelligence approach

    International Nuclear Information System (INIS)

    Sharma, D.D.; Miller, D.D.; Hajek, B.; Chandrasekaran, B.

    1986-01-01

    This paper describes an approach for designing intelligent process and power plant control operator aids. It is argued that one of the key aspects of an intelligent operator aid is the capability for dynamic procedure synthesis with incomplete definition of initial state, unknown goal states, and the dynamic world situation. The dynamic world state is used to determine the goal, select appropriate plan steps from prespecified procedures to achieve the goal, control the execution of the synthesized plan, and provide for dynamic recovery from failure often using a goal hierarchy. The dynamic synthesis of a plan requires integration of various problems solving capabilities such as plan generation, plan synthesis, plan modification, and failure recovery from a plan. The programming language for implementing the DPS framework provides a convenient tool for developing applications. An application of the DPS approach to a Nuclear Power Plant emergency procedure synthesis is also described. Initial test results indicate that the approach is successful in dynamically synthesizing the procedures. The authors realize that the DPS framework is not a solution for all control tasks. However, many existing process and plant control problems satisfy the requirements discussed in the paper and should be able to benefit from the framework described

  2. Nonlinear Burn Control and Operating Point Optimization in ITER

    Science.gov (United States)

    Boyer, Mark; Schuster, Eugenio

    2013-10-01

    Control of the fusion power through regulation of the plasma density and temperature will be essential for achieving and maintaining desired operating points in fusion reactors and burning plasma experiments like ITER. In this work, a volume averaged model for the evolution of the density of energy, deuterium and tritium fuel ions, alpha-particles, and impurity ions is used to synthesize a multi-input multi-output nonlinear feedback controller for stabilizing and modulating the burn condition. Adaptive control techniques are used to account for uncertainty in model parameters, including particle confinement times and recycling rates. The control approach makes use of the different possible methods for altering the fusion power, including adjusting the temperature through auxiliary heating, modulating the density and isotopic mix through fueling, and altering the impurity density through impurity injection. Furthermore, a model-based optimization scheme is proposed to drive the system as close as possible to desired fusion power and temperature references. Constraints are considered in the optimization scheme to ensure that, for example, density and beta limits are avoided, and that optimal operation is achieved even when actuators reach saturation. Supported by the NSF CAREER award program (ECCS-0645086).

  3. Positive Exchange of Flight Controls Program

    Science.gov (United States)

    1995-03-10

    This advisory circular provides guidance for all pilots, especially student pilots, flight instructors, and pilot examiners, on the recommended procedure to use for the positive exchange of flight controls between pilots when operating an aircraft.

  4. Space Shuttle Program (SSP) Dual Docked Operations (DDO)

    Science.gov (United States)

    Sills, Joel W., Jr.; Bruno, Erica E.

    2016-01-01

    This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

  5. PI fussy multimodal controller of programmed gains for the operation in the wide range of a turbo gas unit; Controlador PI difuso multimodo de ganancias programadas para la operacion en rango amplio de una unidad turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Martinez, Arnulfo A.

    2004-11-15

    In this thesis work it was developed a new control algorithm which merges the characteristics of multimode control, gain scheduling control and fuzzy logic techniques, in order to obtain a control system which gives a better gas turbine speed and load control performance, as compared to the current control systems, which are based on conventional PI control algorithms. This new algorithm is intended to provide a better quality control system, which provides both better disturbance rejection response, as well as better reference tracking response. Switching logic (multimode control) and interpolation strategy (gain scheduling) implementation problems are solved applying fuzzy controllers, which retain the advantages of both strategies for non lineal processes in wide operation regions. Since the controllers implemented by the fuzzy system rules are of the same type (PI, Proportional Integral), the multimode gain scheduling fuzzy controller design was reduced to the design of a gain scheduling fuzzy PI controller (PI-GSF). In order to define the gain scheduling scheme, three well-known gain scheduling fuzzy controller design approaches were analyzed and the interpolation mechanism of each of them were compared. The incorporation of a generalized PI controller structure in the local controllers that conform the PI-GSF (see chapter 4), allowed to generate a better control action for both disturbance rejection and reference tracking. As a final product a PI-GSF controller was obtained, which constitutes a more effective control strategy and showed to be a viable solution to the outlined technological problem. With the PI-GSF controller the speed control performance of the generating unit during startup stage, as well as the load control during the generation stage were considerably improved, as compared to the performance obtained with the conventional PI. [Spanish] En este trabajo de tesis se desarrollo un nuevo algoritmo de control que conjunta las caracteristicas de

  6. Telemanipulation - a special activity in remotely controlled operations

    International Nuclear Information System (INIS)

    Rose, K.W.; Andre, Y.

    1992-01-01

    Work to be done in areas hostile to humans needs special and careful preparation. If short-term entry is possible, groups of men can be trained to do the necessary work. If not, special devices have to be designed, built, and tested on mockups before the real work can be executed. Based on experience gained from maintenance in car production and test programs for a reprocessing facility, it was decided to train a special group of men to do remotely controlled work in hostile areas without endangering them and to use their personal experience as the basis for future work. This is the old-fashioned way of all professions. Some needs to be able to do that remotely controlled work with normally existing operational means and combinations of them like cranes, mechanical and electromechanical master slave manipulators (MMSMs and EMSMs), saws, files, hammer, tig-welding equipment, etc., in air as well as underwater. This paper discusses use of a remote operator manipulator (ROM), remote operator welder (ROW), a test of underwater work, and the repair of two activated jets pumps of a boiling water reactor BWR with a fueling machine, reactor crane, EMSM, and conventional tools

  7. Design of a control card for remote operation of the magnet power supply of microtron

    International Nuclear Information System (INIS)

    Khan, A.M.; Hanumaiah, B.; Ganesh; Siddappa, K.

    2003-01-01

    Full text: In this paper we report on a control card developed for remote operation of the magnet power supply of the Microtron. We have used a microcontroller, an ADC, a DAC and some circuit components to make the microcontroller perform the control operations according to the in built program. The value of the parameter to be controlled (i.e. the magnetic field) is given by the main program in the PC kept away from the system. When the user wants to use the magnet power supply system operate the microtron, he will switch ON the system and feed a particular value of the parameter (i.e. magnetic field in Gauss). This value is passed on to the control program in the microcontroller. With this value and the read back value obtained from the sensor the control card activates its control circuitary to maintain the system at the defined parameter value

  8. Divison of Environmental Control Technology program, 1978

    International Nuclear Information System (INIS)

    1979-06-01

    This report covers Division of Environmental Control Technology projects in progress during FY 1978, within the Office of the Assistant Secretary for Environment, Department of Energy. It is the second in a planned series of annual reports. The Division of Environmental Control Technology (ECT) continues to support the Assistant Secretary for Environment (EV) in discharging two primary responsibilities: (1) under the Environmental Engineering (EE) Program, the independent overview and assessment of environmental control aspects of both the U.S. Department of Energy's (DOE) research, development, and demonstration (RD and D) programs and the Nation's energy policies, and (2) under the Decontamination and Decommissioning Program, the reduction of potential environmental hazards at the radioactively contaminated sites that are presently owned or were formerly used by the Government. This report presents a short summary of objectives, approach, progress and results, future plans, and a reference bibliography for each research, development, or assessment project within the program areas described above

  9. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  10. Controlled thermonuclear reactions and Tora Supra program

    International Nuclear Information System (INIS)

    1988-01-01

    The research programs for the nuclear energy production by means of thermonuclear fusion are shown. TORA SUPRA, Joint European Torus, Next European Torus and those developed at the Atomic Energy Center are described. The controlled fusion necessary conditions, the energy and confinement balance, and the research of a better tokamak configuration are discussed. A description of TORA SUPRA, the ways of achieving the project and the expected delays are shown. The Controlled Fusion Research Department functions, concerning these programs, are described. The importance of international cooperation and the perspectives about the use of controlled fusion are underlined [fr

  11. Material control system simulator program reference manual

    Energy Technology Data Exchange (ETDEWEB)

    Hollstien, R.B.

    1978-01-24

    A description is presented of a Material Control System Simulator (MCSS) program for determination of material accounting uncertainty and system response to particular adversary action sequences that constitute plausible material diversion attempts. The program is intended for use in situations where randomness, uncertainty, or interaction of adversary actions and material control system components make it difficult to assess safeguards effectiveness against particular material diversion attempts. Although MCSS may be used independently in the design or analysis of material handling and processing systems, it has been tailored toward the determination of material accountability and the response of material control systems to adversary action sequences.

  12. Material control system simulator program reference manual

    International Nuclear Information System (INIS)

    Hollstien, R.B.

    1978-01-01

    A description is presented of a Material Control System Simulator (MCSS) program for determination of material accounting uncertainty and system response to particular adversary action sequences that constitute plausible material diversion attempts. The program is intended for use in situations where randomness, uncertainty, or interaction of adversary actions and material control system components make it difficult to assess safeguards effectiveness against particular material diversion attempts. Although MCSS may be used independently in the design or analysis of material handling and processing systems, it has been tailored toward the determination of material accountability and the response of material control systems to adversary action sequences

  13. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  14. Controlling fugitive dust emissions in material handling operations

    Energy Technology Data Exchange (ETDEWEB)

    Tooker, G E

    1992-05-01

    The primary mechanism of fugitive dust generation in bulk material handling transfer operations is by dispersion of dust in turbulent air induced to flow with falling or projected material streams. This paper returns to basic theories of particle dynamics and fluid mechanics to quantify the dust generating mechanism by rational analysis. Calculations involving fluid mechanisms are made easier by the availability of the personal computer and the many math manipulating programs. Rational analysis is much more cost effective when estimating collection air volumes to control fugitive emissions; especially in enclosed material handling transfers transporting large volumes of dusty material. Example calculations, using a typical enclosed conveyor-to-conveyor transfer operation are presented to illustrate and highlight the key parameters that determine the magnitude of induced air flow that must be controlled. The methods presented in this paper for estimating collection air volumes apply only enclosed material handling transfers, exhausted to a dust collector. Since some assistance to the control of dust emissions must be given by the material handling transfer chute design, a discussion of good transfer chute design practice is presented. 4 refs., 2 figs., 2 tabs.

  15. Numerical simulation of energy efficiency measures: control and operational strategies

    International Nuclear Information System (INIS)

    Ardehali, M. M.

    2006-01-01

    The inherent limitation in performance of building envelop components and heating ventilating and air conditioning (HVAC) equipment necessitates the examination of operational strategies for improvement in energy-efficient operation of buildings. Due to the ease of installation and increasing availability of electronic controllers, operational strategies that could be programmed are of particular interest. The Iowa Energy Center in the US has taken the initiative to conduct the necessary assessment of current HVAC technology and the commonly-used operational strategies for commercial and industrial buildings, as applied to the midwestern part of the country, with weather and energy cost data for Des Moines, Iowa. The first part of this study focused on the energy consumption and cost effectiveness of HVAC systems. The objectives of the second part is concerned with examination of various operational strategies, namely, night purge (NP), fan optimum start and stop (OSS), condenser water reset (CWR), and chilled water reset (CHWR) applied to order and newer-type commercial office buildings. The indoor air quality requirement are met and the latest applicable energy rates from local utility companies are used. The results show that, in general, NP is not an effective strategy in buildings with low thermal mass storage, OSS reduced fan energy, and CWR and CHWR could be effective and require chillers with multi-stage unloading characteristics. The most operationally efficient strategies are the combination of OSS, CWR, and CHWR for the older-type building, and OSS for the newer-type building. Economically, the most effective is the OSS strategy for the older-type building and the CHWR strategy for the newer-type building.(Author)

  16. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  17. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  18. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  19. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  20. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  1. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  2. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  3. The development of natural circulation operation support program for ship nuclear power machinery

    International Nuclear Information System (INIS)

    Hao, Jianli; Chen, Wenzhen; Chen, Zhiyun

    2012-01-01

    Highlights: ► The natural circulation under various ocean and ship motion conditions is studied. ► A natural circulation operation support computer program (NCOSP) is developed with Simulink. ► The NCOSP program has the merit of easy input preparation, fast and accurate simulation. ► The NCOSP is suitable for the fast parameter simulation of ship nuclear power machinery. -- Abstract: The existing simulation program of ship nuclear power machinery (SNPM) cannot adequately deal with the natural circulation (NC) operation and the effects of various ocean conditions and ship motion. Aiming at the problem, the natural circulation operation support computer program for SNPM is developed, in which the momentum conservation equation of the primary loop, some heat transfer and flow resistance models and equations are modified for the various ocean conditions and ship motion. The additional pressure loss model and effective height model for the control volume in the gyration movement, simple harmonic rolling and pitching movements are also discussed in the paper. Furthermore, the transient response to load change under NC conditions is analyzed by the developed program. The results are compared with those predicted by the modified RELAP5/mod3.2 code. It is shown that the natural circulation operation support program (NCOSP) is simple in the input preparation, runs fast and has a satisfactory precision, and is therefore very suitable for the operating field support of SNPM under the conditions of NC.

  4. Artificial intelligence program in a computer application supporting reactor operations

    International Nuclear Information System (INIS)

    Stratton, R.C.; Town, G.G.

    1985-01-01

    Improving nuclear reactor power plant operability is an ever-present concern for the nuclear industry. The definition of plant operability involves a complex interaction of the ideas of reliability, safety, and efficiency. This paper presents observations concerning the issues involved and the benefits derived from the implementation of a computer application which combines traditional computer applications with artificial intelligence (AI) methodologies. A system, the Component Configuration Control System (CCCS), is being installed to support nuclear reactor operations at the Experimental Breeder Reactor II

  5. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

    1996-08-01

    Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

  6. Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.; Bassett, R.R.; Briasco, S. [and others

    1995-12-01

    The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

  7. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  8. Program management aid for redundancy selection and operational guidelines

    Science.gov (United States)

    Hodge, P. W.; Davis, W. L.; Frumkin, B.

    1972-01-01

    Although this criterion was developed specifically for use on the shuttle program, it has application to many other multi-missions programs (i.e. aircraft or mechanisms). The methodology employed is directly applicable even if the tools (nomographs and equations) are for mission peculiar cases. The redundancy selection criterion was developed to insure that both the design and operational cost impacts (life cycle costs) were considered in the selection of the quantity of operational redundancy. These tools were developed as aids in expediting the decision process and not intended as the automatic decision maker. This approach to redundancy selection is unique in that it enables a pseudo systems analysis to be performed on an equipment basis without waiting for all designs to be hardened.

  9. Employers should disband employee weight control programs.

    Science.gov (United States)

    Lewis, Alfred; Khanna, Vikram; Montrose, Shana

    2015-02-01

    American corporations continue to expand wellness programs, which now reach an estimated 90% of workers in large organizations, yet no study has demonstrated that the main focus of these programs-weight control-has any positive effect. There is no published evidence that large-scale corporate attempts to control employee body weight through financial incentives and penalties have generated savings from long-term weight loss, or a reduction in inpatient admissions associated with obesity or even long-term weight loss itself. Other evidence contradicts the hypothesis that population obesity rates meaningfully retard economic growth or manufacturing productivity. Quite the contrary, overscreening and crash dieting can impact employee morale and even harm employee health. Therefore, the authors believe that corporations should disband or significantly reconfigure weight-oriented wellness programs, and that the Affordable Care Act should be amended to require such programs to conform to accepted guidelines for harm avoidance.

  10. A program for performing angular integrations for transition operators

    International Nuclear Information System (INIS)

    Froese Fischer, C.; Godefroid, M.R.; Hibbert, A.

    1991-01-01

    The MCHF-MLTPOL program performs the angular integrations necessary for expressing the matrix elements of transition operators, E1, E2, ..., or M1, M2, ..., as linear combinations of radial integrals. All matrix elements for transitions between two lists of configuration states will be evaluated. A limited amount of non-orthogonality is allowed between orbitals of the initial and final state. (orig.)

  11. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  12. Stochastic control theory dynamic programming principle

    CERN Document Server

    Nisio, Makiko

    2015-01-01

    This book offers a systematic introduction to the optimal stochastic control theory via the dynamic programming principle, which is a powerful tool to analyze control problems. First we consider completely observable control problems with finite horizons. Using a time discretization we construct a nonlinear semigroup related to the dynamic programming principle (DPP), whose generator provides the Hamilton–Jacobi–Bellman (HJB) equation, and we characterize the value function via the nonlinear semigroup, besides the viscosity solution theory. When we control not only the dynamics of a system but also the terminal time of its evolution, control-stopping problems arise. This problem is treated in the same frameworks, via the nonlinear semigroup. Its results are applicable to the American option price problem. Zero-sum two-player time-homogeneous stochastic differential games and viscosity solutions of the Isaacs equations arising from such games are studied via a nonlinear semigroup related to DPP (the min-ma...

  13. Micro controller based system for characterizing gas detector operating parameters

    International Nuclear Information System (INIS)

    Thakur, Vaishali M.; Verma, Amit K.; Anilkumar, S.; Babu, D.A.R.; Sharma, D.N.; Harikumar, M.

    2011-01-01

    The estimation and analysis of radioactivity levels in samples from environment and from various stages of nuclear fuel cycle operations has become a matter of concern for the implementation of radiological safety procedures. Gas filled/ flow detectors play crucial role in achieving this objective. Since these detectors need high voltage for their operation, the operating characteristics of each detector for optimum performance has to be determined before incorporating into the systems. The operating voltages of these detectors are ranging from few hundred volts to few kilo volts. Present paper describes the design of microcontroller based system to control two HV modules (Electron tubes make: PS2001/12P) independently and acquire data from different gas filled radiation detectors simultaneously. The system uses Philips 80C552 microcontroller based Single Board Computer (SBC). The inbuilt DAC and ADC of microcontroller were used to control HV from 0-2000 with less than ± 1 %, error 1000V. The starting HV, HV step size, decision making intelligence to terminate HV increment (for preset plateau slope) and data acquisition (for preset time), data acquisition time etc., can be programmed. Nearly 200 detectors data (20 data points per detector) can be stored and transferred to PC on request. Data collected by the system for LND 719 GM detectors with starting voltage from 500 V, HV step size of 24 V and 100 seconds counting time to find out the plateau length. The plateau slope and length obtained with this system for LND 719 GM detectors are 3-5%/100V and ∼ 150V respectively. (author)

  14. Field Operations Program Neighborhood Electric Vehicles - Fleet Survey

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward; Carroll, M.

    2001-07-01

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

  15. Field Operations Program - Neighborhood Electric Vehicle Fleet Use

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J. E.; Carroll, M. R.

    2001-07-02

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

  16. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  17. Contamination control plan for prelaunch operations

    Science.gov (United States)

    Austin, J. D.

    1983-01-01

    A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.

  18. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    International Nuclear Information System (INIS)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea

    2014-01-01

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators

  19. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators.

  20. Overview of AEOD's program for trending reactor operational events

    International Nuclear Information System (INIS)

    Baranowsky, P.W.; O'Reilly, P.D.; Rasmuson, D.M.; Houghton, J.R.

    1994-01-01

    This paper presents an overview of the trending program being performed by AEOD. The major elements of the program include: (1) system and component reliability trending and analysis, (2) special data collection and analysis (e.g., IPE and PRA component failure data, common cause failure event data), (3) risk assessment of safety issues based on actual operating experience, (4) Accident Sequence Precursor (ASP) Program, and (5) trending US industry risk. AEOD plans to maintain up-to-date safety data trends for selected high risk or high regulatory profile components, systems, accident initiators, accident sequences, and regulatory issues. AEOD will also make greater use of PRA insights and perform limited probabilistic safety assessments to evaluate the safety significance of qualitative results. Examples of a system study and an issue evaluation are presented, as well as a summary of the common cause failure event database

  1. The Next Generation of Ground Operations Command and Control; Scripting in C no. and Visual Basic

    Science.gov (United States)

    Ritter, George; Pedoto, Ramon

    2010-01-01

    Scripting languages have become a common method for implementing command and control solutions in space ground operations. The Systems Test and Operations Language (STOL), the Huntsville Operations Support Center (HOSC) Scripting Language Processor (SLP), and the Spacecraft Control Language (SCL) offer script-commands that wrap tedious operations tasks into single calls. Since script-commands are interpreted, they also offer a certain amount of hands-on control that is highly valued in space ground operations. Although compiled programs seem to be unsuited for interactive user control and are more complex to develop, Marshall Space flight Center (MSFC) has developed a product called the Enhanced and Redesign Scripting (ERS) that makes use of the graphical and logical richness of a programming language while offering the hands-on and ease of control of a scripting language. ERS is currently used by the International Space Station (ISS) Payload Operations Integration Center (POIC) Cadre team members. ERS integrates spacecraft command mnemonics, telemetry measurements, and command and telemetry control procedures into a standard programming language, while making use of Microsoft's Visual Studio for developing Visual Basic (VB) or C# ground operations procedures. ERS also allows for script-style user control during procedure execution using a robust graphical user input and output feature. The availability of VB and C# programmers, and the richness of the languages and their development environment, has allowed ERS to lower our "script" development time and maintenance costs at the Marshall POIC.

  2. Scheduling and control of programs in the CICADA computer system for TFTR

    International Nuclear Information System (INIS)

    Christianson, G.B.; Sherrick, M.; Stark, W.

    1983-01-01

    The CICADA computer system is a network of super minicomputers for data acquisition, reduction, display and device control on the TFTR experiment. Human interaction with the CICADA system is accomplished by consoles offering color displays with a high degree of operator interaction with the computer system, and by interactive terminals offering a limited degree of operator interaction. The authors describe the software packages and data bases used to control the consoles and provide communication to an application program attached to a console. The console control program in its turn schedules the execution of control programs that furnish operating system interfaces to applications programs executing at a console or terminal (in response to human activation), or upon activation by scheduling tasks. The control programs handle functions such as applications task activation. They discuss the implementation of the control programs in the multi-computer CICADA environment, and describe the control program data bases. In a TFTR shot cycle, applications programs must be scheduled for activation at operator-defined stages, in order to accomplish the arming of hardware devices, acquisition of summary waveform data, and the acquisition and archiving of raw data. The authors describe the software tasks and data bases of the CICADA event system, which accomplishes this scheduling of applications task activation in conjunction with the control programs. Future enhancements planned for the console control, program control, and event systems are outlined

  3. The Effect of Operations Control on Reliability

    NARCIS (Netherlands)

    Van Oort, N.; Van Nes, R.

    2010-01-01

    Zoetermeer in The Netherlands. During peak hours the frequency on some trajectories is about 24 vehicles an hour. Dealing with these high frequencies and offering travelers a high quality product, according to waiting times as well as the probability of getting a seat, the operator designed a three

  4. JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status

    Science.gov (United States)

    Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team

    2018-01-01

    After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.

  5. Enhanced Engine Control for Emergency Operation

    Science.gov (United States)

    Litt, Jonathan S.

    2012-01-01

    C-MAPSS40k engine simulation has been developed and is available to the public. The authenticity of the engine performance and controller enabled the development of realistic enhanced control modes through controller modification alone. Use of enhanced control modes improved stability and control of an impaired aircraft. - Fast Response is useful for manual manipulation of the throttles - Use of Fast Response improved stability as part of a yaw rate feedback system. - Use of Overthrust shortened takeoff distance, but was generally useful in flight, too. Initial lack of pilot familiarity resulted in discomfort, especially with yaw rate feedback, but that was the only drawback, overall the pilot found the enhanced modes very helpful.

  6. 78 FR 54510 - New Entrant Safety Assurance Program Operational Test

    Science.gov (United States)

    2013-09-04

    ... safety management controls; (2) consider their effects on small businesses; and (3) consider establishing alternate locations where such reviews may be conducted for the convenience of small businesses. In response... safety review within 18 months of starting interstate operations. [49 U.S.C. 31144(g)]. In issuing these...

  7. Inventory Control of Spare Parts for Operating Nuclear Power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    2006-07-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea.

  8. Inventory Control of Spare Parts for Operating Nuclear Power plants

    International Nuclear Information System (INIS)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull

    2006-01-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea

  9. Belt conveyor dynamics in transient operation for speed control

    OpenAIRE

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control. According to literature review, current research rarely takes the conveyor dynamics in transient operation into account. However, in belt conveyor speed control, the conveyor dynamic behaviors are signifi...

  10. DOE Radiological Control Manual Core Training Program

    International Nuclear Information System (INIS)

    Scott, H.L.; Maisler, J.

    1993-01-01

    Over the past year, the Department of Energy (DOE) Office of Health (EH-40) has taken a leading role in the development of new standardized radiological control training programs for use throughout the DOE complex. The Department promulgated its Radiological Control (RadCon) Manual in June 1992. To ensure consistent application of the criteria presented in the RadCon Manual, standardized radiological control core training courses and training materials have been developed for implementation at all DOE facilities. In producing local training programs, standardized core courses are to be supplemented with site-specific lesson plans, viewgraphs, student handbooks, qualification standards, question banks, and wallet-sized training certificates. Training programs for General Employee Radiological Training, Radiological Worker I and II Training, and Radiological Control Technician Training have been disseminated. Also, training committees under the direction of the Office of Health (EH-40) have been established for the development of additional core training courses, development of examination banks, and the update of the existing core training courses. This paper discusses the current activities and future direction of the DOE radiological control core training program

  11. Development of control system in abdominal operating ROV

    OpenAIRE

    ZHANG Weikang; WANG Guanxue; XU Guohua; LIU Chang; SHEN Xiong

    2017-01-01

    In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUV)recovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV) was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control...

  12. Implementation of an operator model with error mechanisms for nuclear power plant control room operation

    International Nuclear Information System (INIS)

    Suh, Sang Moon; Cheon, Se Woo; Lee, Yong Hee; Lee, Jung Woon; Park, Young Taek

    1996-01-01

    SACOM(Simulation Analyser with Cognitive Operator Model) is being developed at Korea Atomic Energy Research Institute to simulate human operator's cognitive characteristics during the emergency situations of nuclear power plans. An operator model with error mechanisms has been developed and combined into SACOM to simulate human operator's cognitive information process based on the Rasmussen's decision ladder model. The operational logic for five different cognitive activities (Agents), operator's attentional control (Controller), short-term memory (Blackboard), and long-term memory (Knowledge Base) have been developed and implemented on blackboard architecture. A trial simulation with a scenario for emergency operation has been performed to verify the operational logic. It was found that the operator model with error mechanisms is suitable for the simulation of operator's cognitive behavior in emergency situation

  13. Visual operations control in administrative environments

    Energy Technology Data Exchange (ETDEWEB)

    Carson, M.L.; Levine, L.O.

    1995-03-01

    When asked what comes to mind when they think of ``controlling work`` in the office, people may respond with ``overbearing boss,`` ``no autonomy,`` or ``Theory X management.`` The idea of controlling work in white collar or administrative environments can have a negative connotation. However, office life is often chaotic and miserable precisely because the work processes are out of control, and managers must spend their time looking over people`s shoulders and fighting fires. While management styles and structures vary, the need for control of work processes does not. Workers in many environments are being reorganized into self-managed work teams. These teams are expected to manage their own work through increased autonomy and empowerment. However, even empowered work teams must manage their work processes because of process variation. The amount of incoming jobs vary with both expected (seasonal) and unexpected demand. The mixture of job types vary over time, changing the need for certain skills or knowledge. And illness and turnover affect the availability of workers with needed skills and knowledge. Clearly, there is still a need to control work, whether the authority for controlling work is vested in one person or many. Visual control concepts provide simple, inexpensive, and flexible mechanisms for managing processes in work teams and continuous improvement administrative environments.

  14. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  15. Duke Power Company's control rod wear program

    International Nuclear Information System (INIS)

    Culp, D.C.; Kitlan, M.S. Jr.

    1990-01-01

    Recent examinations performed at several foreign and domestic pressurized water reactors have identified significant control rod cladding wear, leading to the conclusion that previously believed control rod lifetimes are not attainable. To monitor control rod performance and reduce safety concerns associated with wear, Duke Power Company has developed a comprehensive control rod wear program for Ag-In-Cd and boron carbide (B 4 C) rods at the McGuire and Catawba nuclear stations. Duke Power currently uses the Westinghouse 17 x 17 Ag-In-Cd control rod design at McGuire Unit 1 and the Westinghouse 17 x 17 hybrid B 4 C control rod design with a Ag-In-Cd tip at McGuire Unit 2 and Catawba Units 1 and 2. The designs are similar, with the exception of the absorber material and clad thickness. There are 53 control rods per unit

  16. [Controlling and operation management in hospitals].

    Science.gov (United States)

    Vagts, Dierk A

    2010-03-01

    The economical pressure on the health system and especially on hospitals is growing rapidly. Hence, economical knowledge for people in medical executive positions becomes imperative. In advanced and forward-looking hospitals controlling is gaining more and more weight, because it takes over a coordinative responsibility. Ideally controlling is navigating the teamwork of managers (CEOs) and medical executives by weighing medical necessities and economical framework. Controlling is contributing to evaluate an optimal efficiency of a hospital in a highly competitive surrounding by providing medical and economical data on a regular basis. A close, open-minded and trusting cooperation between all people, who are involved, is imperative. Hence, controlling in the proper meaning of the word can not flourish in dominant and hierarchic hospital structures. Georg Thieme Verlag Stuttgart * New York.

  17. Command and Control for Joint Air Operations

    Science.gov (United States)

    2010-01-12

    systems, to include collaborative air planning tools such as the theater battle management core system ( TBMCS ). Operational level air planning occurs in...sight communications and data exchange equipment in order to respond to joint force requirements. For example, the TBMCS is often used. The use of ATO...generation and dissemination software portions of TBMCS has been standardized. This ATO feature allows the JAOC to be interoperable with other

  18. Vascular Trauma Operative Experience is Inadequate in General Surgery Programs.

    Science.gov (United States)

    Yan, Huan; Maximus, Steven; Koopmann, Matthew; Keeley, Jessica; Smith, Brian; Virgilio, Christian de; Kim, Dennis Y

    2016-05-01

    Vascular injuries may be challenging, particularly for surgeons who have not received formal vascular surgery fellowship training. Lack of experience and improper technique can result in significant complications. The objective of this study was to examine changes in resident experience with operative vascular trauma over time. A retrospective review was performed using Accreditation Council for Graduate Medical Education (ACGME) case logs of general surgery residents graduating between 2004 and 2014 at 2 academic, university-affiliated institutions associated with level 1 trauma centers. The primary outcome was number of reported vascular trauma operations, stratified by year of graduation and institution. A total of 112 residents graduated in the study period with a median 7 (interquartile range 4.5-13.5) vascular trauma cases per resident. Fasciotomy and exposure and/or repair of peripheral vessels constituted the bulk of the operative volume. Linear regression showed no significant trend in cases with respect to year of graduation (P = 0.266). Residents from program A (n = 53) reported a significantly higher number of vascular trauma cases when compared with program B (n = 59): 12.0 vs. 5.0 cases, respectively (P < 0.001). Level 1 trauma center verification does not guarantee sufficient exposure to vascular trauma. The operative exposure in program B is reflective of the national average of 4.0 cases per resident as reported by the ACGME, and this trend is unlikely to change in the near future. Fellowship training may be critical for surgeons who plan to work in a trauma setting, particularly in areas lacking vascular surgeons. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Design of Air Traffic Control Operation System

    Directory of Open Access Journals (Sweden)

    Gabriela STROE

    2017-09-01

    Full Text Available This paper presents a numerical simulation for a different aircraft, based on the specific aircraft data that can be incorporated in the model and the equations of motions which can be consequently solved. The aircraft flight design involves various technical steps and requires the use of sophisticated software having modeling and simulation capabilities. Within the flight simulation model, the aerodynamic model can be regarded as the most complex and most important. With appropriate aerodynamic modeling the aerodynamic forces and moments acting on the aircraft's center of gravity can be numerically solved with accuracy. These forces and moments are further used to solve the equations of motion. The development of control and computing technology makes it possible for advanced flight control strategy. The advanced control techniques tend to make the control design and their implementation much more complicated with more control loops or channels; in this line, the autopilot of modern aircrafts includes a variety of automatic control systems that aid and support the flight navigation, flight management, and perform the enhancing and/or augmenting of the stability characteristics of the airplane. Therefore in this context it is very important to choose the dynamic that will satisfy the performance and robustness specifications.

  20. CONTROL: the run control program used on the WA62 VAX data acquisition system at CERN

    International Nuclear Information System (INIS)

    Hand, R.P.

    1980-11-01

    The criteria are described which have been used in the design of CONTROL, a program in the WA62 VAX Native mode data acquisition system which serves the triple purpose of driving a status display, an operator's console and a message reporter. (U.K.)

  1. HEALS Hypertension Control Program: Training Church Members as Program Leaders.

    Science.gov (United States)

    Dodani, Sunita; Beayler, Irmatine; Lewis, Jennifer; Sowders, Lindsey A

    2014-01-01

    Health disparities related to cardiovascular diseases (CVDs) including stroke have remained higher in the African-Americans (AAs) than in other populations. HEALS is a faith-based hypertension (HTN) control program modified according to AA community needs, and delivered by the church-lay members called church health advisors (CHAs). This study examined the feasibility and acceptability of training CHAs as HEALS program leaders. Four CHAs completed a 10-hour HEALS program training workshop at the Church, conducted by the nutrition experts. Workshop was evaluated by CHAs on their level of satisfaction, clarity of contents covered and comfort in delivery the program to the church congregation. The overall six main HEALS curriculum components were completed. Workshop was highly evaluated by CHAs on length of training, balance between content and skills development, and level of satisfaction with program delivery. Church-based culturally modified health promotion interventions conducted by the community lay members may be a way to reduce health disparities in ethnic minorities.

  2. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  3. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  4. Water quality control program in experimental circuits

    International Nuclear Information System (INIS)

    Cegalla, Miriam A.

    1996-01-01

    The Water Quality Control Program of the Experimental Circuits visualizes studying the water chemistry of the cooling in the primary and secondary circuits, monitoring the corrosion of the systems and studying the mechanism of the corrosion products transport in the systems. (author)

  5. Programming the control of magnetic field measurements

    International Nuclear Information System (INIS)

    David, L.

    1998-01-01

    This paper gives a short review concerning the new NMR probe measurement control system. Then it presents the new program 'CYCLOCHAMP' attached to the magnetic field measurement which also allows to cycle the magnetic field inside the cyclotrons and to equilibrate it among the SSC sectors. (authors)

  6. Operation control equipment for BWR type reactor

    International Nuclear Information System (INIS)

    Izumi, Masayuki; Takeda, Renzo.

    1981-01-01

    Purpose: To improve the temperature balance in a feedwater heater by obtaining the objective value of a feedwater enthalpy upon calculation of respective measured values and controlling the opening or closing of an extraction valve so that the objective value may coincide with the measured value, thereby averaging the axial power distribution. Constitution: A plurality of stages of extraction lines are connected to a turbine, and extraction valves are respectively provided at the lines. By calculating the measured values of ractor pressure, reactor core flow rate, vapor flow rate and reactor core inlet enthalpy determined to predetermined value using heat balance the objective feedwater enthalpy is obtained, is fed as an extraction valve opening or closing signal from a control equipment, the extraction stages of the turbine extraction are altered in accordance with this signal, and the feedwater enthalpy is controlled. (Sekiya, K.)

  7. Method for evaluating operator inputs to digital controllers

    International Nuclear Information System (INIS)

    Venhuizen, J.R.

    1983-01-01

    Most industrial processes employ operator-interactive control systems. The performance of these control systems is influenced by the choice of control station (device through which operator enters control commands). While the importance of proper control-station selection is widely accepted, standard and simple selection methods are not available for the control station using color-graphics terminals. This paper describes a unique facility for evaluating the effectiveness of various control stations. In the facility, a process is simulated on a hybrid computer, color-graphics display terminals provide information to the operator, and different control stations accept input commands to control the simulation. Tests are being conducted to evaluate a keyboard, a graphics tablet, and a CRT touch panel for use as control stations on a nuclear power plant. Preliminary results indicate that our facility can be used to determine those situations where each type of station is advantageous

  8. Expert operator preferences in remote manipulator control systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.; Woods, H.

    1995-06-01

    This report describes a survey of expert remote manipulator operators designed to identify features of control systems related to operator efficiency and comfort. It provides information for designing the control center for the Single-Shell Tank Waste Retrieval Manipulator System (TWRMS) Test Bed, described in a separate report. Research questions concerned preferred modes of control, optimum work sessions, sources of operator fatigue, importance of control system design features, and desired changes in control rooms. Participants comprised four expert remote manipulator operators at Oak Ridge National Laboratory, who individually have from 9 to 20 years of experience using teleoperators. The operators had all used rate and position control, and all preferred bilateral (force-reflecting) position control. They reported spending an average of 2.75 h in control of a teleoperator system during a typical shift. All were accustomed to working in a crew of two and alternating control and support roles in 2-h rotations in an 8-h shift. Operators reported that fatigue in using remote manipulator systems came mainly from watching TV monitors and making repetitive motions. Three of four experienced symptoms, including headaches and sore eyes, wrists, and back. Of 17 features of control rooms rated on importance, highest ratings went to comfort and support provided by the operator chair, location of controls, location of video monitors, video image clarity, types of controls, and control modes. When asked what they wanted to change, operators said work stations designed for comfort; simpler, lighter hand-controls; separate controls for each camera; better placement of remote camera; color monitors; and control room layouts that support crew interaction. Results of this small survey reinforced the importance of ergonomic factors in remote manipulation

  9. Program MASTERCALC: an interactive computer program for radioanalytical computations. Description and operating instructions

    International Nuclear Information System (INIS)

    Goode, W.

    1980-10-01

    MASTERCALC is a computer program written to support radioanalytical computations in the Los Alamos Scientific Laboratory (LASL) Environmental Surveillance Group. Included in the program are routines for gross alpha and beta, 3 H, gross gamma, 90 Sr and alpha spectroscopic determinations. A description of MASTERCALC is presented and its source listing is included. Operating instructions and example computing sessions are given for each type of analysis

  10. The Role of Well Control Training in Developing Safe Onshore and Offshore Oil Drilling Operations

    Science.gov (United States)

    Abulhassn, Aber

    2016-01-01

    This research investigates the role of the International Well Control Forum (IWCF) Rotary Drilling Well Control Training Program in developing safe oil drilling operations from the perspective of onshore and offshore drilling crews. The research methodology is a qualitative case study. A total of 40 IWCF candidates were interviewed, with 10 from…

  11. Modern operator's consoles for accelerator control at Fermilab

    International Nuclear Information System (INIS)

    Lucas, P.; Cahill, K.; Peters, R.; Smedinghoff, J.

    1991-01-01

    Since the construction of the Tevatron the Fermilab accelerator complex has been controlled from operator's consoles based on PDP-11 computers and interaction with display hardware via Camac. In addition the Linac has been controllable from microprocessor-based local consoles. The new generation of console devices is based on VAXstation computers, networked by Ethernet and Token Ring, and utilizing the X-windows protocol. Under X the physical display (server) can be driven by any network node, and need not be part of the console computer (client). This allows great flexibility in configuring display devices - with X-terminals, Unix workstations, and Macintoshes all having been utilized. Over half of the 800 application programs on the system have been demonstrated to work properly in the new environment. The modern version of a Linac local console runs in a Macintosh. These are networked via Token Ring to Linac local control stations. They provide color graphics and a hard copy capability which was previously lacking

  12. Fluid logic control circuit operates nutator actuator motor

    Science.gov (United States)

    1966-01-01

    Fluid logic control circuit operates a pneumatic nutator actuator motor. It has no moving parts and consists of connected fluid interaction devices. The operation of this circuit demonstrates the ability of fluid interaction devices to operate in a complex combination of series and parallel logic sequence.

  13. Performance expectations of measurement control programs

    International Nuclear Information System (INIS)

    Hammond, G.A.

    1985-01-01

    The principal index for designing and assessing the effectiveness of safeguards is the sensitivity and reliability of gauging the true status of material balances involving material flows, transfers, inventories, and process holdup. The measurement system must not only be capable of characterizing the material for gradation or intensity of protection, but also be responsive to needs for detection and localization of losses, provide confirmation that no diversion has occurred, and help meet requirements for process control, health and safety. Consequently, the judicious application of a measurement control and quality assurance program is vital to a complete understanding of the capabilities and limitations of the measurement system including systematic and random components of error for weight, volume, sampling, chemical, isotopic, and nondestructive determinations of material quantities in each material balance area. This paper describes performance expectations or criteria for a measurement control program in terms of ''what'' is desired and ''why'', relative to safeguards and security objectives

  14. A model technology transfer program for independent operators

    Energy Technology Data Exchange (ETDEWEB)

    Schoeling, L.G.

    1996-08-01

    In August 1992, the Energy Research Center (ERC) at the University of Kansas was awarded a contract by the US Department of Energy (DOE) to develop a technology transfer regional model. This report describes the development and testing of the Kansas Technology Transfer Model (KTTM) which is to be utilized as a regional model for the development of other technology transfer programs for independent operators throughout oil-producing regions in the US. It describes the linkage of the regional model with a proposed national technology transfer plan, an evaluation technique for improving and assessing the model, and the methodology which makes it adaptable on a regional basis. The report also describes management concepts helpful in managing a technology transfer program.

  15. Operation and Control of Enzymatic Biodiesel Production

    DEFF Research Database (Denmark)

    Price, Jason Anthony; Huusom, Jakob Kjøbsted; Nordblad, Mathias

    This work explores the control of biodiesel production via an enzymatic catalyst. The process involves the transesterification of oils/fats with an alcohol (usually methanol or ethanol), using enzymatic catalysts to generate mono-alkyl esters (the basis of biodiesel) and glycerol as by......-product. Current literature indicates that enzymatic processing of oils and fats to produce biodiesel is technically feasible and developments in immobilization technology indicate that enzyme catalysts can become cost effective compared to chemical processing. However, with very few exceptions, enzyme technology...... is not currently used in commercial-scale biodiesel production. This is mainly due to non-optimized process designs, which do not use the full potential of the catalysts in a cost-efficient way. Furthermore is it unclear what process variables need to be monitored and controlled to ensure optimal economics...

  16. Object oriented programming interfaces for accelerator control

    International Nuclear Information System (INIS)

    Hoff, L.T.

    1997-01-01

    Several years ago, the AGS controls group was given the task of developing software for the RHIC accelerator. Like the AGS, the RHIC control system needs to control and monitor equipment distributed around a relatively large geographic area. A local area network connects this equipment to a collection of UNIX workstations in a central control room. Similar software had been developed for the AGS about a decade earlier, but isn't well suited for RHIC use for a number of reasons. Rather than adapt the AGS software for RHIC use, the controls group opted to start with a clean slate. To develop software that would address the shortcomings of the AGS software, while preserving the useful features that evolved through years of use. A current trend in control system design is to provide an object oriented programming interface for application developers. This talk will discuss important aspects and features of object oriented application programming interfaces (APIs) for accelerator control systems, and explore why such interfaces are becoming the norm

  17. Induction thermoelastic actuator with controllable operation regime

    Czech Academy of Sciences Publication Activity Database

    Doležel, Ivo; Kotlan, V.; Krónerová, E.; Ulrych, B.

    2010-01-01

    Roč. 29, č. 4 (2010), s. 1004-1014 ISSN 0332-1649 R&D Projects: GA ČR GA102/09/1305 Institutional research plan: CEZ:AV0Z20570509 Keywords : control of position * thermoelastic actuator * electromagnetic field Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 0.386, year: 2010 www.emeraldinsight.com/compel.htm

  18. Belt conveyor dynamics in transient operation for speed control

    NARCIS (Netherlands)

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control.

  19. Relating Operational Art to the National Guard State Partnership Program

    Science.gov (United States)

    2014-05-15

    Program Coordinator GEF Global Employment of the Force DSCA Defense Support of Civil Authorities BCA Budget Control Act NATO North Atlantic Treaty...between Florida and the U.S. Virgin Islands are referred to as the Regional Security System (RSS). Florida and the U.S. Virgin Islands partner with... Atlantic Treaty Organization (NATO) in 2004 due, in part, to the mentorship from the Maryland National Guard.54 Not only did the Maryland National Guard

  20. Assessment of the operating conditions of coordinated Q-V controller within secondary voltage control system

    Directory of Open Access Journals (Sweden)

    Arnautović Dušan

    2014-01-01

    Full Text Available The paper, discusses the possibility to use coordinated Q-V controller (CQVC to perform secondary voltage control at the power plant level. The CQVC performs the coordination of the synchronous generators' (SG reactive power outputs in order to maintain the same total reactive power delivered by the steam power plant (SPP, while at the same time maintaining a constant voltage with programmed reactive droop characteristic at the SPP HV busbar. This busbar is the natural pilot node for secondary voltage control at HV level as the node with maximum power production and maximum power consumption. In addition to voltage control, the CQVC maintains the uniform allocation of reactive power reserves at all SGs in the power plant. This is accomplished by setting the reactive power of each SG at given operating point in accordance to the available reactive power of the same SG at that point. Different limitations imposed by unit's and plant equipment are superimposed on original SG operating chart (provided by the manufacturer in order to establish realistic limits of SG operation at given operating point. The CQVC facilitates: i practical implementation of secondary voltage control in power system, as it is capable of ensuring delivery of reactive power as requested by regional/voltage control while maintaining voltage at system pilot node, ii the full deployment of available reactive power of SGs which in turn contributes to system stability, iii assessment of the reactive power impact/contribution of each generator in providing voltage control as ancillary service. Furthermore, it is also possible to use CQVC to pricing reactive power production cost at each SG involved and to design reactive power bidding structure for transmission network devices by using recorded data. Practical exploitation experience acquired during CQVC continuous operation for over two years enabled implementation of the optimal setting of reference voltage and droop on daily

  1. Divison of Environmental Control Technology program, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Mott, William E.

    1979-06-01

    This report covers Division of Environmental Control Technology projects in progress during FY 1978, within the Office of the Assistant Secretary for Environment, Department of Energy. It is the second in a planned series of annual reports. The Division of Environmental Control Technology (ECT) continues to support the Assistant Secretary for Environment (EV) in discharging two primary responsibilities: (1) under the Environmental Engineering (EE) Program, the independent overview and assessment of environmental control aspects of both the U.S. Department of Energy's (DOE) research, development, and demonstration (RD and D) programs and the Nation's energy policies, and (2) under the Decontamination and Decommissioning Program, the reduction of potential environmental hazards at the radioactively contaminated sites that are presently owned or were formerly used by the Government. This report presents a short summary of objectives, approach, progress and results, future plans, and a reference bibliography for each research, development, or assessment project within the program areas described above.

  2. Development and demonstration program for dynamic nuclear materials control

    International Nuclear Information System (INIS)

    Augustson, R.H.; Baron, N.; Ford, R.F.; Ford, W.; Hagen, J.; Li, T.K.; Marshall, R.S.; Reams, V.S.; Severe, W.R.; Shirk, D.G.

    1978-01-01

    A significant portion of the Los Alamos Scientific Laboratory Safeguards Program is directed toward the development and demonstration of dynamic nuclear materials control. The building chosen for the demonstration system is the new Plutonium Processing Facility in Los Alamos, which houses such operations as metal-to-oxide conversion, fuel pellet fabrication, and scrap recovery. A DYnamic MAterials Control (DYMAC) system is currently being installed in the facility as an integral part of the processing operation. DYMAC is structured around interlocking unit-process accounting areas. It relies heavily on nondestructive assay measurements made in the process line to draw dynamic material balances in near real time. In conjunction with the nondestructive assay instrumentation, process operators use interactive terminals to transmit additional accounting and process information to a dedicated computer. The computer verifies and organizes the incoming data, immediately updates the inventory records, monitors material in transit using elapsed time, and alerts the Nuclear Materials Officer in the event that material balances exceed the predetermined action limits. DYMAC is part of the United States safeguards system under control of the facility operator. Because of its advanced features, the system will present a new set of inspection conditions to the IAEA, whose response is the subject of a study being sponsored by the US-IAEA Technical Assistance Program. The central issue is how the IAEA can use the increased capabilities of such a system and still maintain independent verification

  3. Carboy Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors

  4. Cyber Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  5. Cyber Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Daniel Noyes

    2012-03-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  6. Space and Missile Systems Center Standard: Parts, Materials, and Processes Control Program for Space Vehicles

    Science.gov (United States)

    2013-04-12

    preparation , implementation, and operation of a Parts, Materials, and Processes (PMP) control program for use during the design, development...Processes List CDR Critical Design Review CDRL Contract Data Requirements List CMOS Complementary Metal Oxide Semiconductor CONOPS Concept of Operations...Failure Review Board GFE Government Furnished Equipment GIDEP Government Industry Data Exchange Program HBT Heterojunction Bipolar Transistor IPT

  7. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  8. Design basis programs and improvements in plant operation

    International Nuclear Information System (INIS)

    Metcalf, M.F.

    1991-01-01

    Public Service Electric and Gas (PSE and G) Company operates three commercial nuclear power plants in southern New Jersey. The three plants are of different designs and vintages (two pressurized water reactors licensed in 1976 and 1980 and one boiling water reactor licensed in 1986). As the industry recognized the need to develop design basis programs, PSE and G also realized the need after a voluntary 52-day shutdown of one unit because of electrical design basis problems. In its drive to be a premier electric utility, PSE and G has been aggressively active in developing design basis documents (DBDs) with supporting projects and refined uses to obtain the expected value and see the return on investment. Progress on Salem is nearly 75% complete, while Hope Creek is 20% complete. To data, PSE and G has experienced success in the use of DBDs in areas such as development of plant modifications, development of the reliability-centered maintenance program, procedure upgrades, improved document retrieval, resolution of regulatory issues, and training. The paper examines the design basis development process, supporting projects, and expected improvements in plant operations as a result of these efforts

  9. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  10. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  11. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  12. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  13. Systematic control of large computer programs

    International Nuclear Information System (INIS)

    Goedbloed, J.P.; Klieb, L.

    1986-07-01

    A package of CCL, UPDATE, and FORTRAN procedures is described which facilitates the systematic control and development of large scientific computer programs. The package provides a general tool box for this purpose which contains many conveniences for the systematic administration of files, editing, reformating of line printer output files, etc. In addition, a small number of procedures is devoted to the problem of structured development of a large computer program which is used by a group of scientists. The essence of the method is contained in three procedures N, R, and X for the creation of a new UPDATE program library, its revision, and execution, resp., and a procedure REVISE which provides a joint editor - UPDATE session which combines the advantages of the two systems, viz. speed and rigor. (Auth.)

  14. North Fork Feather River Erosion Control Program

    International Nuclear Information System (INIS)

    Harrison, L.

    1991-01-01

    PG and E, an investor owned gas and electric utility serving northern and central California, has been engaged since 1984 in the development and implementation of a regional erosion control program for the 954 square mile northern Sierra Nevada watersheed of the East Branch of the North Fork Feather River in Plumas County, California. PG and E entered into an agreement with 13 governmental agencies and a number of private landowners using Coordinated Resource Management and Planning: to cooperatively develop, fund and implement the program. The group has completed several field projects and has a number of additional projects in various stages of development. This paper reports that the program provides multiple environmental and economic benefits including reduction of soil erosion and sedimentation, improved fisheries, enhancement of riparian habitat, increased land values, improved recreation opportunities, and preservation of watershed resources

  15. Status of selected air pollution control programs, February 1992

    International Nuclear Information System (INIS)

    1992-02-01

    The collection of status reports has been prepared in order to provide a timely summary of selected EPA air pollution control activities to those individuals who are involved with the implementation of these programs. The report contains ozone/carbon monoxide (CO) programs; mobile sources programs; particulate matter nominally 10M and less (PM-10), sulfur dioxide (SO2) and lead programs; New Source Review (NSR); economics programs; emission standards programs; Indian activity programs; mobile sources programs; air toxics programs; acid rain programs; permits programs; chlorofluorocarbons programs; enforcement programs; and other programs

  16. The Movement Control Battalions Role in Airfield Operations

    Science.gov (United States)

    2016-05-17

    November–December 2015 Army Sustainment44 The 53rd Transportation Bat-talion ( Movement Control) (MCB) arrived in Liberia in support of the...over Internet Pro- tocol. The MCT did not have these capabilities. During the deployment, the 53rd MCB consisted of the headquarters The Movement ...Control Battalion’s Role in Airfield Operations The 53rd Transportation Battalion ( Movement Control) assumed responsibility for airfield operations

  17. 21 CFR 111.117 - What quality control operations are required for equipment, instruments, and controls?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...

  18. Modeling and Control for Islanding Operation of Active Distribution Systems

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Saleem, Arshad

    2011-01-01

    to stabilize the frequency. Different agents are defined to represent different resources in the distribution systems. A test platform with a real time digital simulator (RTDS), an OPen Connectivity (OPC) protocol server and the multi-agent based intelligent controller is established to test the proposed multi......Along with the increasing penetration of distributed generation (DG) in distribution systems, there are more resources for system operators to improve the operation and control of the whole system and enhance the reliability of electricity supply to customers. The distribution systems with DG...... are able to operate in is-landing operation mode intentionally or unintentionally. In order to smooth the transition from grid connected operation to islanding operation for distribution systems with DG, a multi-agent based controller is proposed to utilize different re-sources in the distribution systems...

  19. What makes a control system usable? An operational viewpoint

    International Nuclear Information System (INIS)

    Clay, M.

    1990-01-01

    This report discusses the generally accepted successes and shortcomings of the various computer and hardware-based control systems at the Los Alamos Meson Physics Facility (LAMPF) from an operator's standpoint. LAMPF currently utilizes three separate control rooms that, although critically co-dependent, use distinct operating methods. The first, the Injector Control Room, which is responsible for the operation of the three ion sources, the 750 keV transport lines and the 201.25 MHz portion of the linac, uses a predominantly hardware-based control system. The second, the LANSCE Control Room, which is responsible for the operation of the Los Alamos Neutron Scattering Center, uses a graphical touch-panel interface with single-application screens as its control system. The third, the LAMPF Central Control Room, which is responsible for the overall operation of LAMPF, primarily uses a text-oriented keyboard interface with multiple applications per screen. Though each system provides generally reliable human interfacing to the enormously complex and diverse machine known as LAMPF, the operational requirements of speed, usability, and reliability are increasingly necessitating the use of a standard control system that incorporates the positive aspects of all three control systems. (orig.)

  20. Robust Control Design via Linear Programming

    Science.gov (United States)

    Keel, L. H.; Bhattacharyya, S. P.

    1998-01-01

    This paper deals with the problem of synthesizing or designing a feedback controller of fixed dynamic order. The closed loop specifications considered here are given in terms of a target performance vector representing a desired set of closed loop transfer functions connecting various signals. In general these point targets are unattainable with a fixed order controller. By enlarging the target from a fixed point set to an interval set the solvability conditions with a fixed order controller are relaxed and a solution is more easily enabled. Results from the parametric robust control literature can be used to design the interval target family so that the performance deterioration is acceptable, even when plant uncertainty is present. It is shown that it is possible to devise a computationally simple linear programming approach that attempts to meet the desired closed loop specifications.

  1. Environmental monitoring program design for uranium refining and conversion operations

    International Nuclear Information System (INIS)

    1984-08-01

    The objective of this study was to develop recommendations for the design of environmental monitoring programs at Canadian uranium refining and conversion operations. In order to develop monitoring priorities, chemical and radioactive releases to the air and water were developed for reference uranium refining and conversion facilities. The relative significance of the radioactive releases was evaluated through a pathways analysis which estimated dose to individual members of the critical receptor group. The effects of chemical releases to the environment were assessed by comparing predicted air and water contaminant levels to appropriate standards or guidelines. For the reference facilities studied, the analysis suggested that environmental effects are likely to be dominated by airborne release of both radioactive and nonradioactive contaminants. Uranium was found to be the most important radioactive species released to the air and can serve as an overall indicator of radiological impacts for any of the plants considered. The most important nonradioactive air emission was found to be fluoride (as hydrogen fluoride) from the uranium hexafluoride plant. For the uranium trioxide and uranium dioxide plants, air emissions of oxides of nitrogen were considered to be most important. The study recommendations for the design of an environmental monitoring program are based on consideration of those factors most likely to affect local air and water quality, and human radiation exposure. Site- and facility-specific factors will affect monitoring program design and the selection of components such as sampling media, locations and frequency, and analytical methods

  2. Behavioral Health and Performance Operations During the Space Shuttle Program

    Science.gov (United States)

    Beven, G.; Holland, A.; Moomaw, R.; Sipes, W.; Vander Ark, S.

    2011-01-01

    Prior to the Columbia STS 107 disaster in 2003, the Johnson Space Center s Behavioral Health and Performance Group (BHP) became involved in Space Shuttle Operations on an as needed basis, occasionally acting as a consultant and primarily addressing crew-crew personality conflicts. The BHP group also assisted with astronaut selection at every selection cycle beginning in 1991. Following STS 107, an event that spawned an increased need of behavioral health support to STS crew members and their dependents, BHP services to the Space Shuttle Program were enhanced beginning with the STS 114 Return to Flight mission in 2005. These services included the presence of BHP personnel at STS launches and landings for contingency support, a BHP briefing to the entire STS crew at L-11 months, a private preflight meeting with the STS Commander at L-9 months, and the presence of a BHP consultant at the L-1.5 month Family Support Office briefing to crew and family members. The later development of an annual behavioral health assessment of all active astronauts also augmented BHP s Space Shuttle Program specific services, allowing for private meetings with all STS crew members before and after each mission. The components of each facet of these BHP Space Shuttle Program support services will be presented, along with valuable lessons learned, and with recommendations for BHP involvement in future short duration space missions

  3. Empirical investigation of workloads of operators in advanced control rooms

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea; Kim, Seunghwan

    2014-01-01

    This paper compares the workloads of operators in a computer-based control room of an advanced power reactor (APR 1400) nuclear power plant to investigate the effects from the changes in the interfaces in the control room. The cognitive-communicative-operative activity framework was employed to evaluate the workloads of the operator's roles during emergency operations. The related data were obtained by analyzing the tasks written in the procedures and observing the speech and behaviors of the reserved operators in a full-scope dynamic simulator for an APR 1400. The data were analyzed using an F-test and a Duncan test. It was found that the workloads of the shift supervisors (SSs) were larger than other operators and the operative activities of the SSs increased owing to the computer-based procedure. From these findings, methods to reduce the workloads of the SSs that arise from the computer-based procedure are discussed. (author)

  4. NTC operator training program viewed from SAT-based training process

    International Nuclear Information System (INIS)

    Matsumoto, Yoshio

    1996-01-01

    The Nuclear Power Training Center Ltd. (NTC) was established in June 1972 to train PWR plant operators. Operator training was started in Apr. 1974. Presently we have three full-scope, control-room simulators. Recently IAEA recommended that its Systematic Approach to Training (SAT) be used for the training of NPP personnel. We thoroughly examined the SAT-based process and compared it against the NTC training program. As a result, we have recognized that the NTC training program satisfies the SAT-based training process. We now intend to improve the feedback step of the NTC training system. Our efforts continue to produce a relevant program at the forefront of our profession. (author)

  5. Monitor system for stored-program control

    International Nuclear Information System (INIS)

    Fassbender, A.

    1988-06-01

    A brief description of the COSY control system shows that the control functions in COSY are realised by a distributed system. The marginal conditions of the operating system components are explained using the COSY waterworks as an example. From this example and some subsequent considerations, important parameters for the COSY operating system are derived and are used for the system realisation. The result with regard to process communication and process synchronisation is the channel, for which data formats and functionalities are defined. The main functions and the four basic calls are also defined. Implementation of the channel is explained, showing that the required functions are well achieved. Adjustments to the distributed MOSI standard are feasible and appropriate. (orig./DG) [de

  6. The Next Generation of Ground Operations Command and Control; Scripting in C Sharp and Visual Basic

    Science.gov (United States)

    Ritter, George; Pedoto, Ramon

    2010-01-01

    This slide presentation reviews the use of scripting languages in Ground Operations Command and Control. It describes the use of scripting languages in a historical context, the advantages and disadvantages of scripts. It describes the Enhanced and Redesigned Scripting (ERS) language, that was designed to combine the features of a scripting language and the graphical and IDE richness of a programming language with the utility of scripting languages. ERS uses the Microsoft Visual Studio programming environment and offers custom controls that enable an ERS developer to extend the Visual Basic and C sharp language interface with the Payload Operations Integration Center (POIC) telemetry and command system.

  7. Control and evaluation programs for TANSY-KM5

    International Nuclear Information System (INIS)

    Grosshoeg, G.; Aronsson, D.; Hoek, M.; Rydz, R.; Norberg, L.; Urholm, L.

    1991-01-01

    Our first task was to purchase a computer and to create a basic software library for the preliminary test of the components. Our choice was a Starburst system from CES. The computer was a PDP-11/70 on a chip. It is the same computer as the ones used by the auxiliary CAMAC crate controllers in the TANSY system. However, the host has a 256 kbyte memory instead of the 64 kbyte memory used in the crate controllers. The operation system is RSX11-M. It is a real time system with properties suitable for laboratory works. However, the computer works in 64 kbyte partitions which limits the size of the programs. Four program systems were written. The two first were one-parameter systems for amplitude and time measurements using the ADCs and TDCs which later should be included in the TANSY system. These systems were supplemented with two two-parameter systems, one for time and amplitude measurements and one for time measurements on 16 detectors simultaneously. The display capabilities of these program systems have been used extensively by the TANSY programs. The programs needed for the manipulation of the system give the user a possibility to manually run the system without any intervention from the normal CODAS control system. The programs have been used for calibration measurements as well as test of the TANSY system. The evaluation programs use the output file from a normal measurement. The data file may be tested for errors. The true events can be sorted into different configurations. The final one is the neutron energy sort program, which gives the neutron energy distribution

  8. Optimal control of operation efficiency of belt conveyor systems

    International Nuclear Information System (INIS)

    Zhang, Shirong; Xia, Xiaohua

    2010-01-01

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study.

  9. Optimal control of operation efficiency of belt conveyor systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Shirong [Department of Automation, Wuhan University, Wuhan 430072 (China); Xia, Xiaohua [Department of Electrical, Electronic and Computer Engineering, University of Pretoria, Pretoria 0002 (South Africa)

    2010-06-15

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study. (author)

  10. Attitude Control Optimization for ROCSAT-2 Operation

    Science.gov (United States)

    Chern, Jeng-Shing; Wu, A.-M.

    one revolution. The purpose of this paper is to present the attitude control design optimization such that the maximum solar energy is ingested while minimum maneuvering energy is dissipated. The strategy includes the maneuvering sequence design, the minimization of angular path, the sizing of three magnetic torquers, and the trade-off of the size, number and orientations arrangement of momentum wheels.

  11. Decomposing Objectives and Functions in Power System Operation and Control

    DEFF Research Database (Denmark)

    Heussen, Kai; Lind, Morten

    2009-01-01

    mix of challenges posed by renewable energy sources, demand response technologies and smartgrid concepts, affecting all areas of power system operation. Both, new control modes and changes in market design are required. This paper presents a mean-ends perspective to the analysis of the control......The introduction of many new energy solutions requires the adaptation of classical operation paradigms in power systems. In the standard paradigm, a power system is some equivalent of a synchronous generators, a power line and an uncontrollable load. This paradigm has been challenged by a diverse...... structures and operation paradigms in present power systems. In a top-down approach, traditional frequency- and area-control mechanisms are formalized. It is demonstrated that future power system operation paradigms with different generation control modes and controllable demand can be modeled in a coherent...

  12. Operational-safety advantages of LMFBR's: the EBR-II experience and testing program

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lindsay, R.W.; Golden, G.H.

    1982-01-01

    LMFBR's contain many inherent characteristics that simplify control and improve operating safety and reliability. The EBR-II design is such that good advantage was taken of these characteristics, resulting in a vary favorable operating history and allowing for a program of off-normal testing to further demonstrate the safe response of LMFBR's to upsets. The experience already gained, and that expected from the future testing program, will contribute to further development of design and safety criteria for LMFBR's. Inherently safe characteristics are emphasized and include natural convective flow for decay heat removal, minimal need for emergency power and a large negative reactivity feedback coefficient. These characteristics at EBR-II allow for ready application of computer diagnosis and control to demonstrate their effectiveness in response to simulated plant accidents. This latter testing objective is an important part in improvements in the man-machine interface

  13. INTEGRATED ROBOT-HUMAN CONTROL IN MINING OPERATIONS

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2005-04-01

    This report contains a detailed description of the work conducted in the first year of the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of ''software machine kinematics'' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A Bobcat{reg_sign} 435 excavator was retrofitted with electro-hydraulic control valve elements. The modular electronic control was tested and the basic valve characteristics were measured for each valve at the Robotics Laboratory at UNR. Position sensors were added to the individual joint control actuators, and the sensors were calibrated. An electronic central control system consisting of a portable computer, converters and electronic driver components was interfaced to the electro-hydraulic valves and position sensors. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's ''Lone Tree'' mine in Nevada.

  14. Optimizing Biorefinery Design and Operations via Linear Programming Models

    Energy Technology Data Exchange (ETDEWEB)

    Talmadge, Michael; Batan, Liaw; Lamers, Patrick; Hartley, Damon; Biddy, Mary; Tao, Ling; Tan, Eric

    2017-03-28

    The ability to assess and optimize economics of biomass resource utilization for the production of fuels, chemicals and power is essential for the ultimate success of a bioenergy industry. The team of authors, consisting of members from the National Renewable Energy Laboratory (NREL) and the Idaho National Laboratory (INL), has developed simple biorefinery linear programming (LP) models to enable the optimization of theoretical or existing biorefineries. The goal of this analysis is to demonstrate how such models can benefit the developing biorefining industry. It focuses on a theoretical multi-pathway, thermochemical biorefinery configuration and demonstrates how the biorefinery can use LP models for operations planning and optimization in comparable ways to the petroleum refining industry. Using LP modeling tools developed under U.S. Department of Energy's Bioenergy Technologies Office (DOE-BETO) funded efforts, the authors investigate optimization challenges for the theoretical biorefineries such as (1) optimal feedstock slate based on available biomass and prices, (2) breakeven price analysis for available feedstocks, (3) impact analysis for changes in feedstock costs and product prices, (4) optimal biorefinery operations during unit shutdowns / turnarounds, and (5) incentives for increased processing capacity. These biorefinery examples are comparable to crude oil purchasing and operational optimization studies that petroleum refiners perform routinely using LPs and other optimization models. It is important to note that the analyses presented in this article are strictly theoretical and they are not based on current energy market prices. The pricing structure assigned for this demonstrative analysis is consistent with $4 per gallon gasoline, which clearly assumes an economic environment that would favor the construction and operation of biorefineries. The analysis approach and examples provide valuable insights into the usefulness of analysis tools for

  15. Monsanto Mound Laboratory tritium waste control technology development program

    International Nuclear Information System (INIS)

    Bixel, J.C.; Kershner, C.J.; Rhinehammer, T.B.

    1975-01-01

    Over the past four years, implementation of tritium waste control programs has resulted in a 30-fold reduction in the gaseous tritium effluents from Mound Laboratory. However, to reduce tritium waste levels to the ''as low as practicable'' guideline poses problems that are beyond ready solution with state-of-the-art tritium control technology. To meet this advanced technology need, a tritium waste control technology program was initiated. Although the initial thrust of the work under this program was oriented toward development of gaseous effluent treatment systems, its natural evolution has been toward the liquid waste problem. It is thought that, of all the possible approaches to disposal of tritiated liquid wastes, recovery offers the greatest advantages. End products of the recovery processes would be water detritiated to a level below the Radioactivity Concentration Guide (RCG) or detritiated to a level that would permit safe recycle in a closed loop operation and enriched tritium. The detritiated water effluent could be either recycled in a closed loop operation such as in a fuel reprocessing plant or safely released to the biosphere, and the recovered tritium could be recycled for use in fusion reactor studies or other applications

  16. Implementation of a quality control program for a 6 MeV linear photon accelerator

    International Nuclear Information System (INIS)

    Berdaky, Mafalda F.; Caldas, Linda V.E.

    2001-01-01

    This paper describes the operational characteristics of the final process of implementation of a quality control program using routine mechanical and radiation tests. The quality control program was performed during 35 months and demonstrated the excellent stability of this accelerator. (author)

  17. 7 CFR 58.149 - Alternate quality control programs for dairy products.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Alternate quality control programs for dairy products... for dairy products. (a) When a plant has in operation an acceptable quality control program which is... (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS...

  18. U.S. Special Operations Command Training and Education Program

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    .... Special Operations Command (USCINCSOC), to train assigned forces to meet special operations mission taskings and to ensure interoperability with conventional forces and other special operations forces (SOF...

  19. Emulation of MS DOS Operational System on the Autonomous Crate-Controller with I8086 microprocessor

    International Nuclear Information System (INIS)

    Hons, Z.; Cizek, P.; Streit, V.

    1988-01-01

    KM-DOS operating system for CAMAC autonomous crate-controller based on Intel 8086/8087 microprocessor connected with Pravec-16 IBM PC is described. The KM-DOS system fully emulates the MS DOS environment on the CAMAC controller. Thus ASSEMBLER, FORTRAN, C and PASCAL programs compiled and linked on IBM PC and compatible can be run on the CAMAC controller and parall work of both computers is enabled

  20. Controller design approach based on linear programming.

    Science.gov (United States)

    Tanaka, Ryo; Shibasaki, Hiroki; Ogawa, Hiromitsu; Murakami, Takahiro; Ishida, Yoshihisa

    2013-11-01

    This study explains and demonstrates the design method for a control system with a load disturbance observer. Observer gains are determined by linear programming (LP) in terms of the Routh-Hurwitz stability criterion and the final-value theorem. In addition, the control model has a feedback structure, and feedback gains are determined to be the linear quadratic regulator. The simulation results confirmed that compared with the conventional method, the output estimated by our proposed method converges to a reference input faster when a load disturbance is added to a control system. In addition, we also confirmed the effectiveness of the proposed method by performing an experiment with a DC motor. © 2013 ISA. Published by ISA. All rights reserved.

  1. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  2. Computer codes for the operational control of the research reactors

    International Nuclear Information System (INIS)

    Kalker, K.J.; Nabbi, R.; Bormann, H.J.

    1986-01-01

    Four small computer codes developed by ZFR are presented, which have been used for several years during operation of the research reactors FRJ-1, FRJ-2, AVR (all in Juelich) and DR-2 (Riso, Denmark). Because of interest coming from the other reactor stations the codes are documented within the frame work of the IAEA Research Contract No. 3634/FG. The zero-dimensional burnup program CREMAT is used for reactor cores in which flux measurements at each individual fuel element are carried out during operation. The program yields burnup data for each fuel element and for the whole core. On the basis of these data, fuel reloading is prepared for the next operational period under consideration of the permitted minimum shut down reactivity of the system. The program BURNY calculates burnup for fuel elements inaccessible for flux measurements, but for which 'position weighting factors' have been measured/calculated during zero power operation of the core, and which are assumed to be constant in all operational situations. The code CURIAX calculates post-irradiation data for discharged fuel elements needed in their manipulation and transport. These three programs have been written for highly enriched fuel and take into account U-235 only. The modification of CREMAT for LEU Cores and its combiantion with ORIGEN is in preparation. KINIK is an inverse kinetic code and widely used for absorber rod calibration at the abovementioned research reactors. It includes a special polynomial subroutine which can easily be used in other codes. (orig.) [de

  3. Operation control device for a nuclear reactor fuel exchanger

    International Nuclear Information System (INIS)

    Aida, Takashi.

    1984-01-01

    Purpose: To provide a operation control device for a nuclear reactor fuel exchanger with reduced size and weight capable of optionally meeting the complicated and versatile mode of the operation scope. Constitution: The operation range of a fuel exchanger is finely divided so as to attain the state capable of discriminating between operation-allowable range and operation-inhibitive range, which are stored in a memory circuit. Upon operating the fuel exchanger, the position is detected and a divided range data corresponding to the present position is taken out from the memory circuit so as to determine whether the fuel exchanger is to be run or stopped. Use of reduced size and compact IC circuits (calculation circuit, memory circuit, data latch circuit) and input/output interface circuits or the likes contributes to the size reduction of the exchanger control system to enlarge the floor maintenance space. (Moriyama, K.)

  4. EDF EPR project: operating principles validation and human factor engineering program

    International Nuclear Information System (INIS)

    Lefebvre, B.; Berard, E.; Arpino, J.-M.

    2005-01-01

    This article describes the specificities of the operating principles chosen by EDF for the EPR project as a result of an extensive Human Factor Engineering program successfully implemented in an industrial project context. The design process and its achievements benefit of the EDF experience feedback not only in term of NPP operation - including the fully computerized control room of the N4-serie - but also in term of NPP designer. The elements exposed hereafter correspond to the basic design phase of EPR HMI which has been completed and successfully validated by the end of 2003. The article aims to remind the context of the project which basically consists in designing a modern and efficient HMI taking into account the operating needs while relying on proven and reliable technologies. The Human Factor Engineering program implemented merges these both aspects by : 1) being fully integrated within the project activities and scheduling; 2) efficiently taking into account the users needs as well as the feasibility constraints by relying on a multidisciplinary design team including HF specialists, I and C specialists, Process specialists and experienced operator representatives. The resulting design process makes a wide use of experience feedback and experienced operator knowledge to complete largely the existing standards for providing a fully useable and successful design method in an industrial context. The article underlines the design process highlights that largely contribute to the successful implementation of a Human Factor Engineering program for EPR. (authors)

  5. Economics of tobacco control research initiative: Operating costs for ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Economics of tobacco control research initiative: Operating costs for capacity building ... (but misinformed) beliefs about the economic benefits of the tobacco industry ... Nutrition, health policy, and ethics in the age of public-private partnerships.

  6. Control and operation cost optimization of the HISS cryogenic system

    International Nuclear Information System (INIS)

    Porter, J.; Anderson, D.; Bieser, F.

    1984-01-01

    This chapter describes a control strategy for the Heavy Ion Spectrometer System (HISS), which relies upon superconducting coils of cryostable design to provide a particle bending field of 3 tesla. The control strategy has allowed full time unattended operation and significant operating cost reductions. Microprocessor control of flash boiling style LIN circuits has been successful. It is determined that the overall operating cost of most cryogenic systems using closed loop helium systems can be minimized by properly balancing the total heat load between the helium and nitrogen circuits to take advantage of the non-linearity which exists in the power input to 4K refrigeration characteristic. Variable throughput compressors have the advantage of turndown capability at steady state. It is concluded that a hybrid system using digital and analog input for control, data display and alarms enables full time unattended operation

  7. Data mining of air traffic control operational errors

    Science.gov (United States)

    2006-01-01

    In this paper we present the results of : applying data mining techniques to identify patterns and : anomalies in air traffic control operational errors (OEs). : Reducing the OE rate is of high importance and remains a : challenge in the aviation saf...

  8. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  9. Apollo experience report: Guidance and control systems. Engineering simulation program

    Science.gov (United States)

    Gilbert, D. W.

    1973-01-01

    The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

  10. Evaluation of new control rooms by operator performance analysis

    International Nuclear Information System (INIS)

    Mori, M; Tomizawa, T.; Tai, I.; Monta, K.; Yoshimura, S.; Hattori, Y.

    1987-01-01

    An advanced supervisory and control system called PODIA TM (Plant Operation by Displayed Information and Automation) was developed by Toshiba. Since this system utilizes computer driven CRTs as a main device for information transfer to operators, thorough system integration tests were performed at the factory and evaluations were made of operators' assessment from the initial experience of the system. The PODIA system is currently installed at two BWR power plants. Based on the experiences from the development of PODIA, a more advanced man-machine interface, Advanced-PODIA (A-PODIA), is developed. A-PODIA enhances the capabilities of PODIA in automation, diagnosis, operational guidance and information display. A-PODIA has been validated by carrying out systematic experiments with a full-scope simulator developed for the validation. The results of the experiments have been analyzed by the method of operator performance analysis and applied to further improvement of the A-PODIA system. As a feedback from actual operational experience, operator performance data in simulator training is an important source of information to evaluate human factors of a control room. To facilitate analysis of operator performance, a performance evaluation system has been developed by applying AI techniques. The knowledge contained in the performance evaluation system was elicited from operator training experts and represented as rules. The rules were implemented by employing an object-oriented paradigm to facilitate knowledge management. In conclusion, it is stated that the feedback from new control room operation can be obtained at an early stage by validation tests and also continuously by comprehensive evaluation (with the help of automated tools) of operator performance in simulator training. The results of operator performance analysis can be utilized for improvement of system design as well as operator training. (author)

  11. Quench monitoring and control system and method of operating same

    Science.gov (United States)

    Ryan, David Thomas; Laskaris, Evangelos Trifon; Huang, Xianrui

    2006-05-30

    A rotating machine comprising a superconductive coil and a temperature sensor operable to provide a signal representative of superconductive coil temperature. The rotating machine may comprise a control system communicatively coupled to the temperature sensor. The control system may be operable to reduce electric current in the superconductive coil when a signal representative of a defined superconducting coil temperature is received from the temperature sensor.

  12. Storage and distribution/Linear programming for storage operations

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, D

    1978-07-15

    The techniques of linear programing to solve storage problems as applied in a tank farm tie-in with refinery throughput operation include: (1) the time-phased model which works on storage and refinery operations input parameters, e.g., production, distribution, cracking, etc., and is capable of representing product stockpiling in slack periods to meet future peak demands, and investigating alternative strategies such as exchange deals and purchase and leasing of additional storage, and (2) the Monte Carlo simulation method, which inputs parameters, e.g., arrival of crude products at refinery, tankage size, likely demand for products, etc., as probability distributions rather than single values, and is capable of showing the average utilization of facilities, potential bottlenecks, investment required to achieve an increase in utilization, and to enable the user to predict total investment, cash flow, and profit emanating from the original financing decision. The increasing use of computer techniques to solve refinery and storage problems is attributed to potential savings resulting from more effective planning, reduced computer costs, ease of access and more usable software. Diagrams.

  13. Virtual control desk for operators training: a case study for a nuclear power plant simulator

    International Nuclear Information System (INIS)

    Aghina, Mauricio Alves da Cunha e

    2009-03-01

    Nuclear Power Plant (NPP) is a facility for electrical energy generation. Because of its high degree of complexity and very rigid norms of security it is extremely necessary that operators are very well trained for the NPP operation. A mistaken operation by a human operator may cause a shutdown of the NPP, incurring in a huge economical damage for the owner and for the population in the case of a electric net black out. To reduce the possibility of a mistaken operation, the NPP usually have a full scope simulator of the plant's control room, which is the physical copy of the original control room. The control of this simulator is a computer program that can generate the equal functioning of the normal one or some scenarios of accidents to train the operators in many abnormal conditions of the plant. A physical copy of the control room has a high cost for its construction, not only of its facilities but also for its physical components. The proposal of this work is to present a project of a virtual simulator with the modeling in 3D stereo of a control room of a given nuclear plant with the same operation functions of the original simulator. This virtual simulator will have a lower cost and serves for pretraining of operators with the intention of making them familiar to the original control room. (author)

  14. Purpose and benefit of control system training for operators

    International Nuclear Information System (INIS)

    Zimoch, E.; Luedeke, A.

    2012-01-01

    The complexity of accelerators is ever increasing and today it is typical that a large number of feedback loops are implemented, based on sophisticated models which describe the underlying physics. Despite this increased complexity the machine operators must still effectively monitor and supervise the desired behavior of the accelerator. This is not alone sufficient; additionally, the correct operation of the control system must also be verified. This is not always easy since the structure, design, and performance of the control system is usually not visualized and is often hidden to the operator. To better deal with this situation operators need some knowledge of the control system in order to react properly in the case of problems. In fact operators need mental models of the control system to recognize fault states and react appropriate to errors and misbehavior of both, the accelerator and the control system itself. Mental models gained only on infrequent experience can be imprecise or plain wrong in worst case. Control system training can provide a foundation to build better mental models and therefore help to enhance operator responses and machine availability. For a refinement of the mental model repeated experience is needed. This can be provided by training sessions at the real accelerator

  15. Induction by Coinduction and Control Operators in Call-by-Name

    Directory of Open Access Journals (Sweden)

    Yoshihiko Kakutani

    2013-09-01

    Full Text Available This paper studies emulation of induction by coinduction in a call-by-name language with control operators. Since it is known that call-by-name programming languages with control operators cannot have general initial algebras, interaction of induction and control operators is often restricted to effect-free functions. We show that some class of such restricted inductive types can be derived from full coinductive types by the power of control operators. As a typical example of our results, the type of natural numbers is represented by the type of streams. The underlying idea is a counterpart of the fact that some coinductive types can be expressed by inductive types in call-by-name pure language without side-effects.

  16. Mitigating the Long term Operating Extreme Load through Active Control

    DEFF Research Database (Denmark)

    Koukoura, Christina; Natarajan, Anand

    2014-01-01

    blade azimuth location are shown to affect the extreme blade load magnitude during operation in normal turbulence wind input. The simultaneously controlled operation of generator torque variation and pitch variation at low blade pitch angles is detected to be responsible for very high loads acting...... on the blades. Through gain scheduling of the controller (modifications of the proportional Kp and the integral Ki gains) the extreme loads are mitigated, ensuring minimum instantaneous variations in the power production for operation above rated wind speed. The response of the blade load is examined...

  17. Post-operative pain control after tonsillectomy: dexametasone vs tramadol.

    Science.gov (United States)

    Topal, Kubra; Aktan, Bulent; Sakat, Muhammed Sedat; Kilic, Korhan; Gozeler, Mustafa Sitki

    2017-06-01

    Tramadol was found to be more effective than dexamethasone in post-operative pain control, with long-lasting relief of pain. This study aimed to compare the effects of pre-operative local injections of tramadol and dexamethasone on post-operative pain, nausea and vomiting in patients who underwent tonsillectomy. Sixty patients between 3-13 years of age who were planned for tonsillectomy were included in the study. Patients were divided into three groups. Group 1 was the control group. Patients in Group 2 received 0.3 mg/kg Dexamethasone and Group 3 received 0.1 mg/kg Tramadol injection to the peritonsillary space just before the operation. Patients were evaluated for nausea, vomiting, and pain. When the control and the dexamethasone groups were compared; there were statistically significant differences in pain scores at post-operative 15 and 30 min, whereas there was no statistically significant difference in pain scores at other hours. When the control and tramadol groups were compared, there was a statistically significant difference in pain scores at all intervals. When tramadol and dexamethasone groups were compared, there was no statistically significant difference in pain scores at post-operative 15 and 30 min, 1 and 2 h, whereas there was a statistically significant difference in pain scores at post-operative 6 and 24 h.

  18. Control Theory Perspective of Effects-Based Thinking and Operations: Modelling "Operations" as a Feedback Control System

    National Research Council Canada - National Science Library

    Farrell, Philip S

    2007-01-01

    This paper explores operations that involve effects-based thinking (EBT) using Control Theory techniques in order to highlight the concept's fundamental characteristics in a simple and straightforward manner...

  19. PLC and DTAM Software Programs for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This document describe the software programs for the Programmable Logic Controller and the Datable Access Module for Pumping Instrumentation and Control skid ''N''. The Appendices contains copies of the printouts of these software programs. This document describes the software programs for the Allen-Bradley SLC 500 programmable logic controller (PLC) and the Allen-Bradley DTAM PLUS operator interface module used on Pumping Instrumentation and Control (PIC) skid ''N''. The software programs for the SLC 500 and DTAM Plus are based on the core programs provided by Allen-Bradley. The PLC and DTAM software programs on skid ''D'' for SX-104 are the baseline programs. These baselines have been tailored for U-farm skids. The skid ''N'' program for U-109 is similar to the skid ''M'' program for U-102. An Acceptance Test Procedure (ATP) and an Operational Test Procedure (OTP) verify that the software programs meet the specific requirements for U-109 pumping. This document represents the final PLC and DTAM programs for PIC skid ''N'' at U-109. These programs were printed out after the performance of the OTP. The OTP acts as the final qualification test for the software programs. Functional requirements and details of the PLC ladder logic are described in this document. The final programs entered into the PLC and DTAM Plus are included as Appendices to this document

  20. Research on Integrated Control of Microgrid Operation Mode

    Science.gov (United States)

    Cheng, ZhiPing; Gao, JinFeng; Li, HangYu

    2018-03-01

    The mode switching control of microgrid is the focus of its system control. According to the characteristics of different control, an integrated control system is put forward according to the detecting voltage and frequency deviation after switching of microgrid operating mode. This control system employs master-slave and peer-to-peer control. Wind turbine and photovoltaic(PV) adopt P/Q control, so the maximum power output can be achieved. The energy storage will work under the droop control if the system is grid-connected. When the system is off-grid, whether to employ droop control or P/f control is determined by system status. The simulation has been done and the system performance can meet the requirement.

  1. Operation safety of control systems. Principles and methods

    International Nuclear Information System (INIS)

    Aubry, J.F.; Chatelet, E.

    2008-01-01

    This article presents the main operation safety methods that can be implemented to design safe control systems taking into account the behaviour of the different components with each other (binary 'operation/failure' behaviours, non-consistent behaviours and 'hidden' failures, dynamical behaviours and temporal aspects etc). To take into account these different behaviours, advanced qualitative and quantitative methods have to be used which are described in this article: 1 - qualitative methods of analysis: functional analysis, preliminary risk analysis, failure mode and failure effects analyses; 2 - quantitative study of systems operation safety: binary representation models, state space-based methods, event space-based methods; 3 - application to the design of control systems: safe specifications of a control system, qualitative analysis of operation safety, quantitative analysis, example of application; 4 - conclusion. (J.S.)

  2. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  3. Green operations of belt conveyors by means of speed control

    NARCIS (Netherlands)

    He, D.; Pang, Y.; Lodewijks, G.

    2017-01-01

    Belt conveyors can be partially loaded due to the variation of bulk material flow loaded onto the conveyor. Speed control attempts to reduce the belt conveyor energy consumption and to enable the green operations of belt conveyors. Current research of speed control rarely takes the conveyor dynamics

  4. On the unboundedness of control operators for bilinear systems ...

    African Journals Online (AJOL)

    The aim of this work is to study the classes of unbounded linear control operators which ensure the existence and uniqueness of the mild and strong solutions of certain bilinear control systems. By an abstract approach, similar to that adopted by Weiss [18], we obtain a connection between these classes and those ...

  5. Analysis of Access Control Policies in Operating Systems

    Science.gov (United States)

    Chen, Hong

    2009-01-01

    Operating systems rely heavily on access control mechanisms to achieve security goals and defend against remote and local attacks. The complexities of modern access control mechanisms and the scale of policy configurations are often overwhelming to system administrators and software developers. Therefore, mis-configurations are common, and the…

  6. Multilayer control for inverters in parallel operation without signal interconnection

    DEFF Research Database (Denmark)

    Hua, Ming; Hu, Haibing; Xing, Yan

    2011-01-01

    A multilayer control is proposed for inverters with wireless parallel operation in this paper. The control is embedded in every inverter respectively and consists of three layers. The first layer is based on an improved droop method, which shares the active and reactive power in each module...

  7. Multilayer Control for Inverters in Parallel Operation without Intercommunications

    DEFF Research Database (Denmark)

    Hua, Ming; Hu, Haibing; Xing, Yan

    2012-01-01

    In this paper, a multilayer control is proposed for inverters able to operate in parallel without intercommunications. The first control layer is an improved droop method that introduces power proportional terms into the conventional droop scheme, letting both active and reactive power to be shared...

  8. Post operative pain control in inguinal hernia repair: comparison of ...

    African Journals Online (AJOL)

    Background: Post-operative pain control is a key factor in surgery. It greatly increases patient satisfaction, and influences the hospital stay period. Local wound infiltration has often been used to control postoperative pain following hernia surgery, with the use of the conventional local anesthetics like Lidocaine or ...

  9. Novel operation and control modes for series-resonant converters

    NARCIS (Netherlands)

    Haan, de S.W.H.; Huisman, H.

    1985-01-01

    A series-resonant converter (SRC) able to generate an output voltage either lower or higher than the source voltage is described. Moreover, a novel control scheme is presented which renders two degrees of freedom for control and which guarantees symmetrical steady-state waveforms in all operation

  10. COST EFFECTIVE VOC EMISSION CONTROL STARTEGIES FOR MILITARY, AEROSPACE,AND INDUSTRIAL PAINT SPRAY BOOTH OPERATIONS: COMBINING IMPROVED VENTILATION SYSTEMS WITH INNOVATIVE, LOW COST EMISSION CONTROL TECHNOLOGIES

    Science.gov (United States)

    The paper describes a full-scale demonstration program in which several paint booths were modified for recirculation ventilation; the booth exhaust streams are vented to an innovative volatile organic compound (VOC) emission control system having extremely low operating costs. ...

  11. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  12. Aiding operator performance at low power feedwater control

    International Nuclear Information System (INIS)

    Woods, D.D.

    1986-01-01

    Control of the feedwater system during low power operations (approximately 2% to 30% power) is a difficult task where poor performance (excessive trips) has a high cost to utilities. This paper describes several efforts in the human factors aspects of this task that are underway to improve feedwater control. A variety of knowledge acquisition techniques have been used to understand the details of what makes feedwater control at low power difficult and what knowledge and skill distinguishes expert operators at this task from less experienced ones. The results indicate that there are multiple factors that contribute to task difficulty

  13. SMES application for frequency control during islanded microgrid operation

    International Nuclear Information System (INIS)

    Kim, A-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail

  14. SMES application for frequency control during islanded microgrid operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, A-Rong, E-mail: haven21c@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Gyeong-Hun; Heo, Serim; Park, Minwon [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Hak-Man [University of Incheon, Songdo-dong, Incheon 406-772 (Korea, Republic of)

    2013-01-15

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  15. Enterprise SRS: Leveraging Ongoing Operations to Advance National Programs - 13108

    International Nuclear Information System (INIS)

    Marra, J.E.; Murray, A.M.; McGuire, P.W.; Wheeler, V.B.

    2013-01-01

    The SRS is re-purposing its vast array of assets to solve future national issues regarding environmental stewardship, national security, and clean energy. The vehicle for this transformation is Enterprise SRS which presents a new, strategic view of SRS as a united endeavor for 'all things nuclear' as opposed to a group of distinct and separate entities with individual missions and organizations. Key among the Enterprise SRS strategic initiatives is the integration of research into facilities in conjunction with ongoing missions to provide researchers from other national laboratories, academic institutions, and commercial entities the opportunity to demonstrate their technologies in a relevant environment and scale prior to deployment. To manage that integration of research demonstrations into site facilities, The DOE Savannah River Operations Office, Savannah River Nuclear Solutions, and the Savannah River National Laboratory (SRNL) have established the Center for Applied Nuclear Materials Processing and Engineering Research (CANMPER). The key objective of this initiative is to bridge the gap between promising transformational nuclear materials management advancements and large-scale deployment of the technology by leveraging SRS assets (e.g. facilities, staff, and property) for those critical engineering-scale demonstrations necessary to assure the successful deployment of new technologies. CANMPER will coordinate the demonstration of R and D technologies and serve as the interface between the engineering-scale demonstration and the R and D programs, essentially providing cradle-to-grave support to the R and D team during the demonstration. While the initial focus of CANMPER will be on the effective use of SRS assets for these demonstrations, CANMPER also will work with research teams to identify opportunities to perform R and D demonstrations at other facilities. Unique to this approach is the fact that these SRS assets will continue to accomplish DOE's critical

  16. Multilayer robust control for safety enhancement of reactor operations

    International Nuclear Information System (INIS)

    Edwards, R.M.; Lee, K.Y.; Ray, A.

    1991-01-01

    A novel concept of reactor power and temperature control has been recently reported in which a conventional output feedback controller is embedded within a state feedback setting. The embedded output feedback controller at the inner layer largely compensates for plant modeling uncertainties and external disturbances, and the outer layer generates an optimal control signal via feedback of the estimated plant states. A major advantage of this embedded architecture is the robustness of the control system relative to parametric and nonparametric uncertainties and thus the opportunity for designing fault-accommodating control algorithms to improve reactor operations and plant safety. The paper illustrates the architecture of the state-feedback-assisted classical (SFAC) control, which utilizes an embedded output feedback controller designed via classical techniques. It demonstrates the difference between the performance of conventional state feedback control and SFAC by examining the sensitivity of the dominant eigenvalues of the individual closed-loop systems

  17. Controlled Quantum Operations of a Semiconductor Three-Qubit System

    Science.gov (United States)

    Li, Hai-Ou; Cao, Gang; Yu, Guo-Dong; Xiao, Ming; Guo, Guang-Can; Jiang, Hong-Wen; Guo, Guo-Ping

    2018-02-01

    In a specially designed semiconductor device consisting of three capacitively coupled double quantum dots, we achieve strong and tunable coupling between a target qubit and two control qubits. We demonstrate how to completely switch on and off the target qubit's coherent rotations by presetting two control qubits' states. A Toffoli gate is, therefore, possible based on these control effects. This research paves a way for realizing full quantum-logic operations in semiconductor multiqubit systems.

  18. ADVANCED COMPRESSOR ENGINE CONTROLS TO ENHANCE OPERATION, RELIABILITY AND INTEGRITY

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Bourn; Jess W. Gingrich; Jack A. Smith

    2004-03-01

    This document is the final report for the ''Advanced Compressor Engine Controls to Enhance Operation, Reliability, and Integrity'' project. SwRI conducted this project for DOE in conjunction with Cooper Compression, under DOE contract number DE-FC26-03NT41859. This report addresses an investigation of engine controls for integral compressor engines and the development of control strategies that implement closed-loop NOX emissions feedback.

  19. Carboy Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Daniel [Idaho National Laboratory, Idaho (United States)

    2012-03-15

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  20. Control system for several rotating mirror camera synchronization operation

    Science.gov (United States)

    Liu, Ningwen; Wu, Yunfeng; Tan, Xianxiang; Lai, Guoji

    1997-05-01

    This paper introduces a single chip microcomputer control system for synchronization operation of several rotating mirror high-speed cameras. The system consists of four parts: the microcomputer control unit (including the synchronization part and precise measurement part and the time delay part), the shutter control unit, the motor driving unit and the high voltage pulse generator unit. The control system has been used to control the synchronization working process of the GSI cameras (driven by a motor) and FJZ-250 rotating mirror cameras (driven by a gas driven turbine). We have obtained the films of the same objective from different directions in different speed or in same speed.

  1. Programs for control of an analog-signal switching network

    International Nuclear Information System (INIS)

    D'Ottavio, T.; Enriquez, R.; Katz, R.; Skelly, J.

    1989-01-01

    A suite of programs has been developed to control the network of analog-signal switching multiplexers in the AGS complex. The software is driven by a relational database which describes the architecture of the multiplexer tree and the set of available analog signals. Signals are routed through a three-layer multiplexer tree, to be made available at four consoles each with three 4-trace oscilloscopes. A menu-structured operator interface program is available at each console, to accept requests to route any available analog signal to any of that console's 12 oscilloscope traces. A common routing-server program provides automatic routing-server program provides automatic routing of requested signals through the layers of multiplexers, maintaining a reservation database to denote free and in-use trunks. Expansion of the analog signal system is easily accommodated in software by adding new signals, trunks, multiplexers, or consoles to the database. Programmatic control of the triggering signals for each of the oscilloscopes is also provided. 3 refs., 4 figs., 3 tabs

  2. 31 CFR 103.135 - Anti-money laundering programs for operators of credit card systems.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Anti-money laundering programs for...-Money Laundering Programs Anti-Money Laundering Programs § 103.135 Anti-money laundering programs for.... Virgin Islands. (b) Anti-money laundering program requirement. Effective July 24, 2002, each operator of...

  3. Development of control system in abdominal operating ROV

    Directory of Open Access Journals (Sweden)

    ZHANG Weikang

    2017-03-01

    Full Text Available In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUVrecovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control system in which the integrated industrial reinforced computer acts as a surface monitor unit, while the PC104 embedded industrial computer acts as the underwater master control unit and the other drive boards act as the driver unit. In addition, the dynamics model and a robust H-infinity controller for automatic orientation in the horizontal plane were designed and built. Single tests, system tests and underwater tests show that this control system has good real-time performance and reliability, and it can complete the recovery task of a UUV. The presented structure and algorithm could have reference significance to the control system development of mobile robots, drones, and biomimetic robot.

  4. SMES application for frequency control during islanded microgrid operation

    Science.gov (United States)

    Kim, A.-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  5. Risk averse optimal operation of a virtual power plant using two stage stochastic programming

    International Nuclear Information System (INIS)

    Tajeddini, Mohammad Amin; Rahimi-Kian, Ashkan; Soroudi, Alireza

    2014-01-01

    VPP (Virtual Power Plant) is defined as a cluster of energy conversion/storage units which are centrally operated in order to improve the technical and economic performance. This paper addresses the optimal operation of a VPP considering the risk factors affecting its daily operation profits. The optimal operation is modelled in both day ahead and balancing markets as a two-stage stochastic mixed integer linear programming in order to maximize a GenCo (generation companies) expected profit. Furthermore, the CVaR (Conditional Value at Risk) is used as a risk measure technique in order to control the risk of low profit scenarios. The uncertain parameters, including the PV power output, wind power output and day-ahead market prices are modelled through scenarios. The proposed model is successfully applied to a real case study to show its applicability and the results are presented and thoroughly discussed. - Highlights: • Virtual power plant modelling considering a set of energy generating and conversion units. • Uncertainty modelling using two stage stochastic programming technique. • Risk modelling using conditional value at risk. • Flexible operation of renewable energy resources. • Electricity price uncertainty in day ahead energy markets

  6. Operative time and cost of resident surgical experience: effect of instituting an otolaryngology residency program.

    Science.gov (United States)

    Pollei, Taylor R; Barrs, David M; Hinni, Michael L; Bansberg, Stephen F; Walter, Logan C

    2013-06-01

    Describe the procedure length difference between surgeries performed by an attending surgeon alone compared with the resident surgeon supervised by the same attending surgeon. Case series with chart review. Tertiary care center and residency program. Six common otolaryngologic procedures performed between August 1994 and May 2012 were divided into 2 cohorts: attending surgeon alone or resident surgeon. This division coincided with our July 2006 initiation of an otolaryngology-head and neck surgery residency program. Operative duration was compared between cohorts with confounding factors controlled. In addition, the direct result of increased surgical length on operating room cost was calculated and applied to departmental and published resident case log report data. Five of the 6 procedures evaluated showed a statistically significant increase in surgery length with resident involvement. Operative time increased 6.8 minutes for a cricopharyngeal myotomy (P = .0097), 11.3 minutes for a tonsillectomy (P operative time difference. Cost of increased surgical time was calculated per surgery and ranged from $286 (cricopharyngeal myotomy) to $2142 (mastoidectomy). When applied to reported national case log averages for graduating residents, this resulted in a significant increase of direct training-related costs. Resident participation in the operating room results in increased surgical length and additional system cost. Although residency is a necessary part of surgical training, associated costs need to be acknowledged.

  7. Advanced, Integrated Control for Building Operations to Achieve 40% Energy Saving

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Yan; Song, Zhen; Loftness, Vivian; Ji, Kun; Zheng, Sam; Lasternas, Bertrand; Marion, Flore; Yuebin, Yu

    2012-10-15

    We developed and demonstrated a software based integrated advanced building control platform called Smart Energy Box (SEB), which can coordinate building subsystem controls, integrate variety of energy optimization algorithms and provide proactive and collaborative energy management and control for building operations using weather and occupancy information. The integrated control system is a low cost solution and also features: Scalable component based architecture allows to build a solution for different building control system configurations with needed components; Open Architecture with a central data repository for data exchange among runtime components; Extendible to accommodate variety of communication protocols. Optimal building control for central loads, distributed loads and onsite energy resource; uses web server as a loosely coupled way to engage both building operators and building occupants in collaboration for energy conservation. Based on the open platform of SEB, we have investigated and evaluated a variety of operation and energy saving control strategies on Carnegie Mellon University Intelligent Work place which is equipped with alternative cooling/heating/ventilation/lighting methods, including radiant mullions, radiant cooling/heating ceiling panels, cool waves, dedicated ventilation unit, motorized window and blinds, and external louvers. Based on the validation results of these control strategies, they were integrated in SEB in a collaborative and dynamic way. This advanced control system was programmed and computer tested with a model of the Intelligent Workplace's northern section (IWn). The advanced control program was then installed in the IWn control system; the performance was measured and compared with that of the state of the art control system to verify the overall energy savings great than 40%. In addition advanced human machine interfaces (HMI's) were developed to communicate both with building

  8. Integrated Robot-Human Control in Mining Operations

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2007-09-30

    This report contains a detailed description of the work conducted for the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of 'software machine kinematics' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A working prototype has been developed using a Bobcat 435 excavator. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's 'Lone Tree' mine in Nevada. Analysis of these working trajectories has been completed. The motion patterns, when transformed into a family of curves, may serve as the basis for software-controlled machine kinematics transformation in the new human-robot control system. A Cartesian control example has been developed and tested both in simulation and on the experimental excavator. Open-loop control is robustly stable and free of short-term dynamic problems, but it allows for drifting away from the desired motion kinematics of the

  9. 15 CFR 752.11 - Internal Control Programs.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Internal Control Programs. 752.11... COMPREHENSIVE LICENSE § 752.11 Internal Control Programs. (a) Scope—(1) Introduction. It is through Internal Control Programs (ICPs) that the SCL holder and the consignee assure that exports and reexports are not...

  10. 21 CFR 111.110 - What quality control operations are required for laboratory operations associated with the...

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... § 111.110 What quality control operations are required for laboratory operations associated with the...

  11. Human error mode identification for NPP main control room operations using soft controls

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Kim, Jaewhan; Jang, Seung-Cheol

    2011-01-01

    The operation environment of main control rooms (MCRs) in modern nuclear power plants (NPPs) has considerably changed over the years. Advanced MCRs, which have been designed by adapting digital and computer technologies, have simpler interfaces using large display panels, computerized displays, soft controls, computerized procedure systems, and so on. The actions for the NPP operations are performed using soft controls in advanced MCRs. Soft controls have different features from conventional controls. Operators need to navigate the screens to find indicators and controls and manipulate controls using a mouse, touch screens, and so on. Due to these different interfaces, different human errors should be considered in the human reliability analysis (HRA) for advanced MCRs. In this work, human errors that could occur during operation executions using soft controls were analyzed. This work classified the human errors in soft controls into six types, and the reasons that affect the occurrence of the human errors were also analyzed. (author)

  12. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  13. The development of control technologies applied to waste processing operations

    International Nuclear Information System (INIS)

    Grasz, E.; Baker, S.; Couture, S.; Dennison, D.; Holliday, M.; Hurd, R.; Kettering, B.; Merrill, R.; Wilhelmson, K.

    1993-02-01

    Typical waste and residue processes involve some level of human interaction. The risk of exposure to unknown hazardous materials and the potential for radiation contamination provide the impetus for physically separating or removing operators from such processing steps. Technologies that facilitate separation of the operator from potential contamination include glove box robotics; modular systems for remote and automated servicing; and interactive controls that minimize human intervention. Lawrence Livermore National Laboratory (LLNL) is developing an automated system which by design will supplant the operator for glove box tasks, thus affording protection from the risk of radiation exposure and minimizing operator associated waste.This paper describes recent accomplishments in technology development and integration, and outlines the future goals at LLNL for achieving this integrated, interactive control capability

  14. Developing operator capacity estimates for supervisory control of autonomous vehicles.

    Science.gov (United States)

    Cummings, M L; Guerlain, Stephanie

    2007-02-01

    This study examined operators' capacity to successfully reallocate highly autonomous in-flight missiles to time-sensitive targets while performing secondary tasks of varying complexity. Regardless of the level of autonomy for unmanned systems, humans will be necessarily involved in the mission planning, higher level operation, and contingency interventions, otherwise known as human supervisory control. As a result, more research is needed that addresses the impact of dynamic decision support systems that support rapid planning and replanning in time-pressured scenarios, particularly on operator workload. A dual screen simulation that allows a single operator the ability to monitor and control 8, 12, or 16 missiles through high level replanning was tested on 42 U.S. Navy personnel. The most significant finding was that when attempting to control 16 missiles, participants' performance on three separate objective performance metrics and their situation awareness were significantly degraded. These results mirror studies of air traffic control that demonstrate a similar decline in performance for controllers managing 17 aircraft as compared with those managing only 10 to 11 aircraft. Moreover, the results suggest that a 70% utilization (percentage busy time) score is a valid threshold for predicting significant performance decay and could be a generalizable metric that can aid in manning predictions. This research is relevant to human supervisory control of networked military and commercial unmanned vehicles in the air, on the ground, and on and under the water.

  15. SURFSCAN: Program to operate a LASER profilometer. Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Hardy, R.D.

    1995-09-01

    This paper is written to document the SURFSCAN program. A large section of the code is devoted to error recovery. The heavy emphasis on error recovery allows unattended operation for extended periods. By combining error recovery with the use of control files, SURFSCAN has been operated for periods of several days with no operator intervention. At this time, the Surface Profilometer is a useful and productive tool in the Rock Mechanics Laboratory at Sandia National Laboratories/New Mexico. In the Rock Mechanics Laboratory we have been conducting studies of the normal and shear mechanical behavior of fractures and the flow of fluid through fractured rock formations. To estimate these properties, we need to know the average aperture size and surface texture of a fracture. These data may be obtained from surface profiles of mating pieces of rock. By scanning corresponding regions on two mating surfaces, the aperture size may be easily determined

  16. Sprag solenoid brake. [development and operations of electrically controlled brake

    Science.gov (United States)

    Dane, D. H. (Inventor)

    1974-01-01

    The development and characteristics of an electrically operated brake are discussed. The action of the brake depends on energizing a solenoid which causes internally spaced sprockets to contact the inner surface of the housing. A spring forces the control member to move to the braking position when the electrical function is interrupted. A diagram of the device is provided and detailed operating principles are explained.

  17. Utilizing Robot Operating System (ROS) in Robot Vision and Control

    Science.gov (United States)

    2015-09-01

    Palmer, “Development of a navigation system for semi-autonomous operation of wheelchairs,” in Proc. of the 8th IEEE/ASME Int. Conf. on Mechatronic ...and Embedded Systems and Applications, Suzhou, China, 2012, pp. 257-262. [30] G. Grisetti, C. Stachniss, and W. Burgard, “Improving grid-based SLAM...OPERATING SYSTEM (ROS) IN ROBOT VISION AND CONTROL by Joshua S. Lum September 2015 Thesis Advisor: Xiaoping Yun Co-Advisor: Zac Staples

  18. Computer programme for operator support in primary frequency control of NPP Dukovany

    International Nuclear Information System (INIS)

    Kurka, J.; Petruzela, I.; Piroutek, Z.

    1996-01-01

    The computer programme for the control room operator support in the primary frequency control operation of the NPP Dukovany power unit is described. This operational mode has recently been implemented. Until now, the plant has been exclusively operated in the based-load mode at nominal power. The stability of the main unit parameters, unit power output and main steam header pressure, is the characteristic feature for this mode of operation of units with WWER 440 type of reactors. This does no more hold in the new mode in which these both principal parameters vary in dependency on the power network frequency changes. This fact, however, has an important impact on the activities of the control room operators. Therefore, to help them to adapt themselves easily and without unnecessary stresses to new conditions the regulatory body when licensing the new mode finally approved its implementation only if computerized operator support system would be installed in the control room. Such a computer program for the operator support has been recently developed in EGU Prague and has already been implemented into the unit information system on all four Dukovany units. (author). 3 refs, 7 figs

  19. Feasibility of touch-less control of operating room lights.

    Science.gov (United States)

    Hartmann, Florian; Schlaefer, Alexander

    2013-03-01

    Today's highly technical operating rooms lead to fairly complex surgical workflows where the surgeon has to interact with a number of devices, including the operating room light. Hence, ideally, the surgeon could direct the light without major disruption of his work. We studied whether a gesture tracking-based control of an automated operating room light is feasible. So far, there has been little research on control approaches for operating lights. We have implemented an exemplary setup to mimic an automated light controlled by a gesture tracking system. The setup includes a articulated arm to position the light source and an off-the-shelf RGBD camera to detect the user interaction. We assessed the tracking performance using a robot-mounted hand phantom and ran a number of tests with 18 volunteers to evaluate the potential of touch-less light control. All test persons were comfortable with using the gesture-based system and quickly learned how to move a light spot on flat surface. The hand tracking error is direction-dependent and in the range of several centimeters, with a standard deviation of less than 1 mm and up to 3.5 mm orthogonal and parallel to the finger orientation, respectively. However, the subjects had no problems following even more complex paths with a width of less than 10 cm. The average speed was 0.15 m/s, and even initially slow subjects improved over time. Gestures to initiate control can be performed in approximately 2 s. Two-thirds of the subjects considered gesture control to be simple, and a majority considered it to be rather efficient. Implementation of an automated operating room light and touch-less control using an RGBD camera for gesture tracking is feasible. The remaining tracking error does not affect smooth control, and the use of the system is intuitive even for inexperienced users.

  20. Numerical simulation of manual operation at MID stand control room

    International Nuclear Information System (INIS)

    Doca, C.; Dobre, A.; Predescu, D.; Mielcioiu, A.

    2003-01-01

    Since 2000 at INR Pitesti a package of software products devoted to numerical simulation of manual operations at fueling machine control room was developed. So far, specified, designed, worked out and implemented was the PUPITRU code. The following issues were solved: graphical aspects of specific computer - human operator interface; functional and graphical simulation of the whole associated equipment of the control desk components; implementation of the main notation as used in the automated schemes of the control desk in view of the fast identification of the switches, lamps, instrumentation, etc.; implementation within PUPITRU code of the entire data base used in the frame of MID tests; implementation of a number of about 1000 numerical simulation equations describing specific operational MID testing situations

  1. Operational and Strategic Controlling Tools in Microenterprises - Case Study

    Science.gov (United States)

    Konsek-Ciechońska, Justyna

    2017-12-01

    Globalisation and increasing requirements of the environment cause the executives and supervisors to search for more and more perfect solutions, allowing them to streamline and improve the effectiveness of company operations. One of such tools, used more and more often, is controlling, the role of which has substantially increased in the recent years. It is already implemented not only in large companies with foreign capital, but also in increasingly smaller entities, which begin to notice the positive effects of the implications of the principles and tools of controlling - both operational and strategic. The purpose of the article is to demonstrate the practical side of controlling tools that can be used for the purposes of operations conducted by microenterprises.

  2. An empirical study on the basic human error probabilities for NPP advanced main control room operation using soft control

    International Nuclear Information System (INIS)

    Jang, Inseok; Kim, Ar Ryum; Harbi, Mohamed Ali Salem Al; Lee, Seung Jun; Kang, Hyun Gook; Seong, Poong Hyun

    2013-01-01

    Highlights: ► The operation environment of MCRs in NPPs has changed by adopting new HSIs. ► The operation action in NPP Advanced MCRs is performed by soft control. ► Different basic human error probabilities (BHEPs) should be considered. ► BHEPs in a soft control operation environment are investigated empirically. ► This work will be helpful to verify if soft control has positive or negative effects. -- Abstract: By adopting new human–system interfaces that are based on computer-based technologies, the operation environment of main control rooms (MCRs) in nuclear power plants (NPPs) has changed. The MCRs that include these digital and computer technologies, such as large display panels, computerized procedures, soft controls, and so on, are called Advanced MCRs. Among the many features in Advanced MCRs, soft controls are an important feature because the operation action in NPP Advanced MCRs is performed by soft control. Using soft controls such as mouse control, touch screens, and so on, operators can select a specific screen, then choose the controller, and finally manipulate the devices. However, because of the different interfaces between soft control and hardwired conventional type control, different basic human error probabilities (BHEPs) should be considered in the Human Reliability Analysis (HRA) for advanced MCRs. Although there are many HRA methods to assess human reliabilities, such as Technique for Human Error Rate Prediction (THERP), Accident Sequence Evaluation Program (ASEP), Human Error Assessment and Reduction Technique (HEART), Human Event Repository and Analysis (HERA), Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR), Cognitive Reliability and Error Analysis Method (CREAM), and so on, these methods have been applied to conventional MCRs, and they do not consider the new features of advance MCRs such as soft controls. As a result, there is an insufficient database for assessing human reliabilities in advanced

  3. Civil Defense, U. S. A.: A Programmed Orientation to Civil Defense. Unit 4. Warning, Emergency Operations, and Support Programs.

    Science.gov (United States)

    Defense Civil Preparedness Agency (DOD), Battle Creek, MI.

    The need for, and a description of, emergency functions required to save lives and protect property in nuclear or natural disasters are presented. Topics discussed include: (1) The Civil Defense Warning System, (2) Introduction to the Emergency Operations Program, (3) Five subprograms of the Emergency Operations Program, (4) Emergency Operations…

  4. POST-OPERATIVE REHABILITATION PROGRAM AFTER SURGERY ACL RECONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Zoran Đokić

    2013-07-01

    Full Text Available ACL (anterior cruciate ligament are small ligaments inside the knee capsule that connect the femur tibia, main function is to prevent movement of the femur in front of tibia and to provide stability, it also helps in controlling the movement of the knee, in direction back-forward. Injuries of ACL appear in an increasing number of athletes. Per year, from 100,000 people who have an injury of the knee joint, 30% have the reconstruction surgery of ACL. ACL injury accounts about 40% of all sports injuries. The greatest number of injuries just happens in the most popular sports, such as: basketball, football and handball, often in female athlete. After the injury, about 25% of athletes fail to return to the sport. Recovery time after surgery is usually 6-12 months, depending on individual characteristics, as well as technical and tactical demands of specific sports activities. Choosing an appropriate and efficient rehabilitation protocols, and training is of great importance. The aim of this paper is to present training protocol of 60 days, 3 months after ACL reconstruction surgery, of top handball female athletes. In the first 30 days, a total of 74 training sessions were done, 39 trainings and 21 EMS (Electrical Muscle Stimulation treatments, at the end of each workout. Functional abilities and morphological status were measured at the beginning and end of the treatment program. After the training protocol athlete got individual exercise program of 26 days (30 training sessions. After 20 days began with normal training, the 26th day of the first game played. The applied protocol has proven successful, as the third competition season there is no problem with an injury.

  5. Optimization of fuel-cell tram operation based on two dimension dynamic programming

    Science.gov (United States)

    Zhang, Wenbin; Lu, Xuecheng; Zhao, Jingsong; Li, Jianqiu

    2018-02-01

    This paper proposes an optimal control strategy based on the two-dimension dynamic programming (2DDP) algorithm targeting at minimizing operation energy consumption for a fuel-cell tram. The energy consumption model with the tram dynamics is firstly deduced. Optimal control problem are analyzed and the 2DDP strategy is applied to solve the problem. The optimal tram speed profiles are obtained for each interstation which consist of three stages: accelerate to the set speed with the maximum traction power, dynamically adjust to maintain a uniform speed and decelerate to zero speed with the maximum braking power at a suitable timing. The optimal control curves of all the interstations are connected with the parking time to form the optimal control method of the whole line. The optimized speed profiles are also simplified for drivers to follow.

  6. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Full text: Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which has occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  7. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which have occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  8. Issues and approaches in control for autonomous reactor operation

    International Nuclear Information System (INIS)

    Vilim, R. B.; Khalil, H. S.; Wei, T. Y. C.

    2000-01-01

    A capability for autonomous and passively safe operation is one of the goals of the NERI funded development of Generation IV nuclear plants. An approach is described for evaluating the effect of increasing autonomy on safety margins and load behavior and for examining issues that arise with increasing autonomy and their potential impact on performance. The method provides a formal approach to the process of exploiting the innate self-regulating property of a reactor to make it less dependent on operator action and less vulnerable to automatic control system fault and/or operator error. Some preliminary results are given

  9. Precedent approach to the formation of programs for cyclic objects control

    Science.gov (United States)

    Kulakov, S. M.; Trofimov, V. B.; Dobrynin, A. S.; Taraborina, E. N.

    2018-05-01

    The idea and procedure for formalizing the precedent method of formation of complex control solutions (complex control programs) is discussed with respect to technological or organizational objects, the operation of which is organized cyclically. A typical functional structure of the system of precedent control by complex technological unit is developed, including a subsystem of retrospective optimization of actually implemented control programs. As an example, the problem of constructing replaceable planograms for the operation of the link of a heading-and-winning machine on the basis of precedents is considered.

  10. Operational techniques employed for the liquid sodium source term control loops

    International Nuclear Information System (INIS)

    Chulos, L.E.

    1976-01-01

    Four Source Term Control Loops (STCLs) have been designed, constructed, and placed into operation at the Hanford Engineering Development Laboratory (HEDL) as part of the Radioactivity Control Technology program. The data obtained are used to determine the corrosion and deposition of LMFBR materials, including corrosion product radionuclides, in a non-isothermal flowing sodium system. The paper discusses operation of the STCL Facilities and, in particular, the methods used for controlling the oxygen content of the liquid sodium. These methods include cold trapping techniques, hot trapping, seeding the cold traps with sodium oxide, and precipitating the oxygen in the cold trap in a controlled manner. Operational problems encountered with the STCL Facilities and the techniques for correcting these problems are also discussed

  11. 32 CFR 2004.20 - National Industrial Security Program Operating Manual (NISPOM) [201(a)].

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false National Industrial Security Program Operating... Defense INFORMATION SECURITY OVERSIGHT OFFICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NATIONAL INDUSTRIAL SECURITY PROGRAM DIRECTIVE NO. 1 Operations § 2004.20 National Industrial Security Program...

  12. Role Allocations and Communications of Operators during Emergency Operation in Advanced Main Control Rooms

    International Nuclear Information System (INIS)

    Lee, June Seung

    2009-01-01

    The advanced main control room (MCR) in GEN III + nuclear power plants has been designed by adapting modern digital I and C techniques and an advanced man machine interface system (MMIS). Large Display Panels (LDPs) and computer based workstations are installed in the MCR. A Computerized Procedure System (CPS) and Computerized Operation Support System (COSS) with high degrees of automation are supplied to operators. Therefore, it is necessary to set up new operation concepts in advanced MCRs that are different from those applied in conventional MCRs regarding role allocations and communications of operators. The following presents a discussion of the main differences between advanced MCRs and conventional MCRs from the viewpoint of role allocations and communications. Efficient models are then proposed on the basis of a task analysis on a series of emergency operation steps

  13. Nuclear electric power safety, operation, and control aspects

    CERN Document Server

    Knowles, J Brian

    2013-01-01

    Assesses the engineering of renewable sources for commercial power generation and discusses the safety, operation, and control aspects of nuclear electric power From an expert who advised the European Commission and UK government in the aftermath of Three Mile Island and Chernobyl comes a book that contains experienced engineering assessments of the options for replacing the existing, aged, fossil-fired power stations with renewable, gas-fired, or nuclear plants. From geothermal, solar, and wind to tidal and hydro generation, Nuclear Electric Power: Safety, Operation, and Control Aspects ass

  14. Operating control systems in advanced types of nuclear power plants

    International Nuclear Information System (INIS)

    Jeannot, A.; Quittet, Y.; Bonnemort, P.

    The report presented first gives a general description of operating control of the PHENIX reactor, covering the level of automaticity and the methods of data perception. The authors then describe the control of the core, the supervision of cooling and the detection of cladding rupture. A summary description is given of the evolution of the SUPER-PHENIX reactor from its PHENIX predecessor. As regards high temperature reactors, the report discusses control rods, the regulation of the flow of coolant gas, the system of emergency stoppage and the general systems for safety and output limitation, with special attention being paid to particular aspects of some of the control systems

  15. Note: Wide-operating-range control for thermoelectric coolers

    Science.gov (United States)

    Peronio, P.; Labanca, I.; Ghioni, M.; Rech, I.

    2017-11-01

    A new algorithm for controlling the temperature of a thermoelectric cooler is proposed. Unlike a classic proportional-integral-derivative (PID) control, which computes the bias voltage from the temperature error, the proposed algorithm exploits the linear relation that exists between the cold side's temperature and the amount of heat that is removed per unit time. Since this control is based on an existing linear relation, it is insensitive to changes in the operating point that are instead crucial in classic PID control of a non-linear system.

  16. Man-machine interface systems and operator training program for ABWR in Japan

    International Nuclear Information System (INIS)

    Kunito, Susumu

    2004-01-01

    The Tokyo Electric Power Company (TEPCO) has developed a new Main Control Room design for the Advanced Boiling Water Reactor (ABWR) to improve man-machine interface. New configuration of panels and enhanced automation are some of the features of the ABWR type Main Control Room design. Various technologies such as Cathode Ray Tubes (CRTs) and Flat Displays (FDs) with touch-sensitive operations are contributed to the development of the ABWR type control room design. This design will be first applied to Kashiwazaki-Kariwa Nuclear Power Station unit 6 (K-6). To train the operators sufficiently, TEPCO reviewed the operator training program. Compared with the conventional training, new training menu will be added and the training of ABWR operators will be started 6 months earlier. An ABWR simulator is under construction and training using this simulator is scheduled to be started in August 1994, which is 18 months before fuel loading of K-6. We are reviewing malfunction modes on the simulator. (author)

  17. System for controlling the operating temperature of a fuel cell

    Science.gov (United States)

    Fabis, Thomas R.; Makiel, Joseph M.; Veyo, Stephen E.

    2006-06-06

    A method and system are provided for improved control of the operating temperature of a fuel cell (32) utilizing an improved temperature control system (30) that varies the flow rate of inlet air entering the fuel cell (32) in response to changes in the operating temperature of the fuel cell (32). Consistent with the invention an improved temperature control system (30) is provided that includes a controller (37) that receives an indication of the temperature of the inlet air from a temperature sensor (39) and varies the heat output by at least one heat source (34, 36) to maintain the temperature of the inlet air at a set-point T.sub.inset. The controller (37) also receives an indication of the operating temperature of the fuel cell (32) and varies the flow output by an adjustable air mover (33), within a predetermined range around a set-point F.sub.set, in order to maintain the operating temperature of the fuel cell (32) at a set-point T.sub.opset.

  18. Development and Operation of a Voluntary Audit Program.

    Science.gov (United States)

    Murphy, Jerome R.

    This report describes a voluntary audit program implemented by the Educational Testing Service (ETS). The comprehensive audit program was developed to assure that all corporate programs adhere to the ETS Standards for Quality and Fairness. The standards address issues which relate to all ETS activities such as accountability, confidentiality of…

  19. [Three methods for controlling presacral massive bleeding during pelvic operations].

    Science.gov (United States)

    Wang, Xiaoxue; Liu, Zhimin; Xie, Shangkui; Ren, Donglin; Wu, Yin'ai

    2017-12-25

    To evaluate three different methods for controlling presacral massive bleeding during pelvic operations. Clinical data of 11 patients with presacral massive bleeding during pelvic operation at The Sixth Affiliated Hospital of Sun Yat-sen University and 157 Branch Hospital of Guangzhou General Hospital of Guangzhou Military Command from January 2001 to January 2016 were analyzed retrospectively. Hemostasis methods for presacral massive bleeding during operation included gauze packing (whole pressure), drawing pin (local pressure) and absorbable gauze (absorbable gauze was adhered to bleeding position with medical glue after local pressure). Efficacy of these 3 methods for controlling bleeding was evaluated and compared. Ten patients were male and 1 was female with average age of 65.2 (40 to 79) years old. Eight cases were rectal cancer, 2 were presacral malignancies and 1 was rectal benign lesion. Bleeding volume during operation was 300 to 2 500 (median 800) ml. From 2001 to 2012, 4 cases received gauze packing, of whom, 3 cases were scheduled Dixon resection before operation and then had to be referred to Hartman resection; 3 cases died of systemic failure due to postoperative chronic errhysis and infection, and 1 underwent re-operation. At the same time from 2001 to 2012, 5 cases received drawing pin, of whom, bleeding of 3 cases was successfully controlled and Dixon resection was completed. In other 2 cases with hemostasis failure, 1 case underwent re-operation following the use of gauze packing, and another 1 case received absorbable gauze hemostasis. All the 5 patients were healing. From 2013 to 2016, 2 cases completed scheduled anterior resection of rectum after successful hemostasis with absorbable gauze and were healing and discharged. Gauze packing hemostasis is a basic method for controlling presacral massive bleeding. Drawing pin and absorbable gauze hemostasis are more precise and may avoid the change of surgical procedure. But drawing pin has the

  20. Improved operability of the CANDU 9 control centre

    International Nuclear Information System (INIS)

    Macbeth, M. J.; Webster, A.

    1996-01-01

    The next generation CANDU nuclear power plant being designed by AECL is the 900 MWe class CANDU 9 station. It is based upon the Darlington CANDU station design which is among the world leaders in capacity factor with low Operation, Maintenance and Administration (OM and A) costs. This Control Centre design includes the proven functionality of existing CANDU control centres (including the Wolsong 2,3, and 4 control centre improvements, such as the Emergency Core Cooling panels), the characteristics identified by systematic design with human factors analysis of operations requirements and the advanced features needed to improve station operability which is made possible by the application of new technology. The CANDU 9 Control Centre provides plant staff with an improved operability capability due to the combination of proveness, systematic design with human factors engineering and enhanced operating features. Significant features which contribute to this improved operability include: · Standard NSP, BOP and F/H panels with controls and indicators integrated by a standard display/presentation philosophy. · Common plant parameter signal database for extensive monitoring, checking, display and annunciation. · Powerful annunciation system allowing alarm filtering, prioritizing and interrogation to enhance staff recognition of events, plant state and required corrective procedural actions. · The use of an overview display to present immediate and uncomplicated plant status information to facilitate operator awareness of unit status in a highly readable and recognizable format. · Extensive cross checking of similar process parameters amongst themselves, with the counterpart safety system parameters and as well as with 'signature' values obtained from known steady state conditions. · Powerful calculation capabilities, using the plant wide database, providing immediate recognizable and readable and readable output data on plant state information and plant state change

  1. The development of a model of control room operator cognition

    International Nuclear Information System (INIS)

    Harrison, C. Felicity

    1998-01-01

    The nuclear generation station CRO is one of the main contributors to plant performance and safety. In the past, studies of operator behaviour have been made under emergency or abnormal situations, with little consideration being given to the more routine aspects of plant operation. One of the tasks of the operator is to detect the early signs of a problem, and to take steps to prevent a transition to an abnormal plant state. In order to do this CRO must determine that plant indications are no longer in the normal range, and take action to prevent a further move away from normal. This task is made more difficult by the extreme complexity of the control room, and by the may hindrances that the operator must face. It would therefore be of great benefit to understand CRO cognitive performance, especially under normal operating conditions. Through research carried out at several Canadian nuclear facilities we were able to develop a deeper understanding of CRO monitoring of highly automated systems during normal operations, and specifically to investigate the contributions of cognitive skills to monitoring performance. The consultants were asked to develop a deeper understanding of CRO monitoring during normal operations, and specifically to investigate the contributions of cognitive skills to monitoring performance. The overall objective of this research was to develop and validate a model of CRO monitoring. The findings of this research have practical implications for systems integration, training, and interface design. The result of this work was a model of operator monitoring activities. (author)

  2. Control principles for blackstart and island operation of microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, H.; Kauhaniemi, K. (University of Vaasa (Finland))

    2008-07-01

    In some unexpected situations a microgrid may become unstable after transition to islanded mode and all DG units must be disconnected from microgrid. In case of these events a restoration strategy for microgrid blackstart is needed. Also if the islanded microgrid is divided into different protection zones in case of a fault, fault management strategy with capability of very fast operation is needed to maintain stability in the healthy section of the islanded microgrid. The control of microgrid voltage and frequency during the microgrid blackstart is not possible without energy storage unit. In this paper sequence of actions for the microgrid blackstart operation as well as control principles of some DG units during blackstart are defined and simulated with two different microgrid configurations. Also one simulation case considering fault management strategy and control principles during fault in islanded microgrid is presented. Based on the simulations dimensioning principles for the needed energy storage and size of simultaneously controlled loads can be drawn. (orig.)

  3. Synthetic RNA Controllers for Programming Mammalian Cell Fate and Function

    Science.gov (United States)

    2015-11-04

    Final report for “Synthetic RNA controllers for programming mammalian cell fate and function” Principal Investigator: Christina D. Smolke...SUBTITLE Synthetic RNA controllers for programming mammalian cell fate and function 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18   2 Synthetic RNA controllers for programming mammalian cell fate and function Task 1

  4. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit.

  5. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    International Nuclear Information System (INIS)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il

    2015-01-01

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit

  6. Operation and control of large wind turbines and wind farms

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, Poul; Hansen, Anca D.; Thomsen, Kenneth (and others)

    2005-09-01

    This report is the final report of a Danish research project 'Operation and control of large wind turbines and wind farms'. The objective of the project has been to analyse and assess operational strategies and possibilities for control of different types of wind turbines and different wind farm concepts. The potentials of optimising the lifetime/energy production ratio by means of using revised operational strategies for the individual wind turbines are investigated. Different strategies have been simulated, where the power production is decreased to an optimum when taking loads and actual price of produced electricity into account. Dynamic models and control strategies for the wind farms have also been developed, with the aim to optimise the operation of the wind farms considering participation in power system control of power (frequency) and reactive power (voltage), maximise power production, keep good power quality and limit mechanical loads and life time consumption. The project developed models for 3 different concepts for wind farms. Two of the concepts use active stall controlled wind turbines, one with AC connection and one with modern HVDC/VSC connection of the wind farm. The third concept is based on pitch controlled wind turbines using doubly fed induction generators. The models were applied to simulate the behaviour of the wind farm control when they were connected to a strong grid, and some initial simulations were performed to study the behaviour of the wind farms when it was isolated from the main grid on a local grid. Also the possibility to use the available information from the wind turbine controllers to predict the wind speed has been investigated. The main idea has been to predict the wind speed at a wind turbine using up-wind measurements of the wind speed in another wind turbine. (au)

  7. Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program

    Science.gov (United States)

    Selwitz, Jason Lawrence

    Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.

  8. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  9. 0 + 5 Vascular Surgery Residents' Operative Experience in General Surgery: An Analysis of Operative Logs from 12 Integrated Programs.

    Science.gov (United States)

    Smith, Brigitte K; Kang, P Chulhi; McAninch, Chris; Leverson, Glen; Sullivan, Sarah; Mitchell, Erica L

    2016-01-01

    Integrated (0 + 5) vascular surgery (VS) residency programs must include 24 months of training in core general surgery. The Accreditation Council for Graduate Medical Education currently does not require specific case numbers in general surgery for 0 + 5 trainees; however, program directors have structured this time to optimize operative experience. The aim of this study is to determine the case volume and type of cases that VS residents are exposed to during their core surgery training. Accreditation council for graduate medical education operative logs for current 0 + 5 VS residents were obtained and retrospectively reviewed to determine general surgery case volume and distribution between open and laparoscopic cases performed. Standard statistical methods were applied. A total of 12 integrated VS residency programs provided operative case logs for current residents. A total of 41 integrated VS residents in clinical years 2 through 5. During the postgraduate year-1 training year, residents participated in significantly more open than laparoscopic general surgery cases (p surgery cases are hernia repair (20%), skin and soft tissue (7.4%), and breast (6.3%). Residents in programs with core surgery over 3 years participated in significantly more general surgery operations compared with residents in programs with core surgery spread out over 4 years (p = 0.035). 0 + 5 VS residents perform significantly more open operations than laparoscopic operations during their core surgery training. The majority of these operations are minor, nonabdominal procedures. The 0 + 5 VS residency program general surgery operative training requirements should be reevaluated and case minimums defined. The general surgery training component of 0 + 5 VS residencies may need to be restructured to meet the needs of current and future trainees. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  10. CNC Turning Center Operations and Prove Out. Computer Numerical Control Operator/Programmer. 444-334.

    Science.gov (United States)

    Skowronski, Steven D.

    This student guide provides materials for a course designed to instruct the student in the recommended procedures used when setting up tooling and verifying part programs for a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 discusses course content and reviews and demonstrates set-up procedures…

  11. Outcomes of Concurrent Operations: Results From the American College of Surgeons' National Surgical Quality Improvement Program.

    Science.gov (United States)

    Liu, Jason B; Berian, Julia R; Ban, Kristen A; Liu, Yaoming; Cohen, Mark E; Angelos, Peter; Matthews, Jeffrey B; Hoyt, David B; Hall, Bruce L; Ko, Clifford Y

    2017-09-01

    To determine whether concurrently performed operations are associated with an increased risk for adverse events. Concurrent operations occur when a surgeon is simultaneously responsible for critical portions of 2 or more operations. How this practice affects patient outcomes is unknown. Using American College of Surgeons' National Surgical Quality Improvement Program data from 2014 to 2015, operations were considered concurrent if they overlapped by ≥60 minutes or in their entirety. Propensity-score-matched cohorts were constructed to compare death or serious morbidity (DSM), unplanned reoperation, and unplanned readmission in concurrent versus non-concurrent operations. Multilevel hierarchical regression was used to account for the clustered nature of the data while controlling for procedure and case mix. There were 1430 (32.3%) surgeons from 390 (77.7%) hospitals who performed 12,010 (2.3%) concurrent operations. Plastic surgery (n = 393 [13.7%]), otolaryngology (n = 470 [11.2%]), and neurosurgery (n = 2067 [8.4%]) were specialties with the highest proportion of concurrent operations. Spine procedures were the most frequent concurrent procedures overall (n = 2059/12,010 [17.1%]). Unadjusted rates of DSM (9.0% vs 7.1%; P < 0.001), reoperation (3.6% vs 2.7%; P < 0.001), and readmission (6.9% vs 5.1%; P < 0.001) were greater in the concurrent operation cohort versus the non-concurrent. After propensity score matching and risk-adjustment, there was no significant association of concurrence with DSM (odds ratio [OR] 1.08; 95% confidence interval [CI] 0.96-1.21), reoperation (OR 1.16; 95% CI 0.96-1.40), or readmission (OR 1.14; 95% CI 0.99-1.29). In these analyses, concurrent operations were not detected to increase the risk for adverse outcomes. These results do not lessen the need for further studies, continuous self-regulation and proactive disclosure to patients.

  12. Maintaining quality control in a nontraditional nuclear technology degree program

    International Nuclear Information System (INIS)

    DeSain, G.W.

    1989-01-01

    Regents College, created by the Board of Regents of the University of The State on New York in 1971, has been offering, since January 1985, AS and BS degrees in nuclear technology. The impetus for establishing the nuclear technology degrees came from nuclear utility management and had to do with the US Nuclear Regulatory Commission proposed rule regarding degreed operators on shift. There are a variety of ways to earn credits in Regents College degree programs: (1) college courses taken for degree-level credit from regionally accredited colleges; (2) courses sponsored by business, industry, or government that have been evaluated and recommended for credit by the New York National or American Council on Education (ACE's) Program on Noncollegiate Sponsored Instruction (PONSI); (3) military education that has been evaluated by ACE PONSI; (4) approved college-proficiency examinations; and (5) special assessment: an individualized examination of college-level knowledge gained from experience or independent study. Nuclear technology students primarily use college course work, evaluated military education, and proficiency examinations to complete degree programs. However, an increasing number of utilities are having training programs PONSI evaluated, resulting in an increased use of these courses in the nuclear technology degrees. Quality control is a function of several factors described in the paper

  13. Operational controlling - a tool of translating strategy into action

    Directory of Open Access Journals (Sweden)

    2011-03-01

    Full Text Available . Enterprises have a lot of problems with realization their strategic aims in the fast changing and competitive business arena from many years. Effective execution of strategic plan needs its translating into action, task results and indicators of everyday activities. The success on the market is attainable by communicating strategic and operating goals on the each level of organizational structure and their connecting with budget of units or employee motivation. The scorecards balancing in finance, customer, process and development perspectives is very useful for pointing - what do we control with? or - what do we have to achieve? But doesn't answer to question about ways of enterprise managing. Main aim of the article is proving that operational controlling system is a essential tool for translating strategy into action. The Balanced Scorecard methodology should to take into consideration system and process connection of enterprise with procurement, co-operation or distribution supply chain also.

  14. Control Operator for the Two-Dimensional Energized Wave Equation

    Directory of Open Access Journals (Sweden)

    Sunday Augustus REJU

    2006-07-01

    Full Text Available This paper studies the analytical model for the construction of the two-dimensional Energized wave equation. The control operator is given in term of space and time t independent variables. The integral quadratic objective cost functional is subject to the constraint of two-dimensional Energized diffusion, Heat and a source. The operator that shall be obtained extends the Conjugate Gradient method (ECGM as developed by Hestenes et al (1952, [1]. The new operator enables the computation of the penalty cost, optimal controls and state trajectories of the two-dimensional energized wave equation when apply to the Conjugate Gradient methods in (Waziri & Reju, LEJPT & LJS, Issues 9, 2006, [2-4] to appear in this series.

  15. Real-Time Plasma Control Tools for Advanced Tokamak Operation

    International Nuclear Information System (INIS)

    Varandas, C. A. F.; Sousa, J.; Rodrigues, A. P.; Carvalho, B. B.; Fernandes, H.; Batista, A. J.; Cruz, N.; Combo, A.; Pereira, R. C.

    2006-01-01

    Real-time control will play an important role in the operation and scientific exploitation of the new generation fusion devices. This paper summarizes the real-time systems and diagnostics developed by the Portuguese Fusion Euratom Association based on digital signal processors and field programmable gate arrays

  16. The character of harms: operational challenges in control

    National Research Council Canada - National Science Library

    Sparrow, Malcolm K

    2008-01-01

    ... approach which he terms "the sabotage of harms." The book explores the institutional arrangements and decision-frameworks necessary to support this emerging operational model. Written for reflective practitioners charged with risk-control responsibilities across the public, private, and non-governmental sectors, The Character ...

  17. Control rod for the operation of nuclear reactor

    International Nuclear Information System (INIS)

    Ishida, Hiromi

    1987-01-01

    Purpose: To conduct spectrum shift operation without complicating the reactor core structures, reducing the probability of failures. Constitution: An operation control rod which is driven while passed vertically in the reactor core comprises a strong absorption portion, moderation portion and weak moderation portion defined orderly from above to below and the length for each of the portions is greater than the effective reactor core height. If the operation control rod is lifted to the maximum limit in the upward direction of the reactor core, the weak moderation portion is corresponded over the effective length of the reactor core. Since the weak moderation portion is filled with zirconium and moderators are not present in the operation control rod, water draining gap is formed, neutron spectral shift is formed, excess reactivity is suppressed, absorption of neutrons to fuel fertile material is increased and the formation of nuclear fission material is increased. From the middle to the final stage of the cycle, the control rod is lowered, by which the moderator/fuel effective volume ratio is increased to increase the reactivity. (Kamimura, M.)

  18. 47 CFR 78.51 - Remote control operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Remote control operation. 78.51 Section 78.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... shall also be equipped with suitable devices for observing the overall characteristics of the...

  19. Response Times of Operators in a Control Room

    DEFF Research Database (Denmark)

    Platz, O.; Rasmussen, Jens; Skanborg, Preben Zacho

    A statistical analysis was made of operator response times recorded in the control room of a research reactor during the years 1972-1974. A homogeneity test revealed that the data consist of a mixture of populations. A small but statistically significant difference is found between day and night...

  20. MIMO Self-Tuning Control of Chemical Process Operation

    DEFF Research Database (Denmark)

    Hallager, L.; Jørgensen, S. B.; Goldschmidt, L.

    1984-01-01

    The problem of selecting a feasible model structure for a MIMO self-tuning controller (MIMOSC) is addressed. The dependency of the necessary structure complexity in relation to the specific process operating point is investigated. Experimental results from a fixed-bed chemical reactor are used...

  1. Operator support through modern optimal estimation and control

    International Nuclear Information System (INIS)

    Burdick, G.R.

    1980-01-01

    Applications of Modern Optimal Estimation and Control Theories are late in coming to the nuclear industry. Some features of the theories that might be exploited in nuclear systems applications are described. Activities at the Idaho National Engineering Laboratory relating to operator support using those theories are identified and some implementation challenges are discussed

  2. H∞ control of a remotely operated underwater vehicle

    International Nuclear Information System (INIS)

    Conte, G.; Serrani, A.

    1994-01-01

    The paper discusses the application of H∞ control techniques to the design of a control system for a remotely operated underwater vehicle. As the main problem in defining a control strategy for such vehicles is the nonlinear and uncertain nature of the modeled dynamics, the robustness properties of H∞ controllers can in principle be used to provide stability and nominal performances for the closed loop system. Therefore, a control strategy based on a scheduling of such controllers has been proposed, and the overall performance of the closed loop system have been evaluated by means of nonlinear simulation in a broad range of working conditions, with particular attention to the effects of the underwater current that acts on the vehicle

  3. Operational experience with the control scheme for IUAC linac booster

    International Nuclear Information System (INIS)

    Sahu, B.K.; Antony, J.; Mathuria, D.S.; Pandey, A.; Ghosh, S.; Mehta, R.; Rai, A.; Patra, P.; Choudhury, G.K.; Singh, K.; Ajith Kumar, B.P.; Kanjilal, D.; Roy, A.

    2009-01-01

    Accelerated beam from the first superconducting linear accelerator (linac) module of IUAC has been delivered to the user. The linac control scheme has worked successfully with the existing pelletron control scheme. Local RF control system consisting of Resonator controller and supporting RF modules are used for multipactoring conditioning, high power pulse conditioning and for the phase/amplitude locking of the superconducting resonators. Beam acceleration is done by adjusting the RF phase of each resonator with respect to master oscillator. The automation of control scheme is planned for smooth operation of linac with minimum human intervention. Python software support is added for writing automation routines in present control system software. An alternate tuning mechanism based on piezoelectric actuators has been successfully tested. (author)

  4. LOFT advanced control room operator diagnostic and display system (ODDS)

    International Nuclear Information System (INIS)

    Larsen, D.G.; Robb, T.C.

    1980-01-01

    The Loss-of-Fluid Test (LOFT) Reactor Facility in Idaho includes a highly instrumented nuclear reactor operated by the Department of Energy for the purpose of establishing nuclear safety requirements. The results of the development and installation into LOFT of an Operator Diagnostic and Display System (ODDS) are presented. The ODDS is a computer-based graphics display system centered around a PRIME 550 computer with several RAMTEK color graphic display units located within the control room and available to the reactor operators. Use of computer-based color graphics to aid the reactor operator is discussed. A detailed hardware description of the LOFT data system and the ODDS is presented. Methods and problems of backfitting the ODDS equipment into the LOFT plant are discussed

  5. Robust Nonlinear Control with Compensation Operator for a Peltier System

    Directory of Open Access Journals (Sweden)

    Sheng-Jun Wen

    2014-01-01

    Full Text Available Robust nonlinear control with compensation operator is presented for a Peltier actuated system, where the compensation operator is designed by using a predictive model on heat radiation. For the Peltier system, the heat radiation is related to the fourth power of temperature. So, the heat radiation is affected evidently by the temperature when it is high and temperature difference between the system and environment is large. A new nonlinear model with the heat radiation is set up for the system according to some thermal conduction laws. To ensure robust stability of the nonlinear system, operator based robust right coprime factorization design is considered. Also, a compensation operator based on a predictive model is proposed to cancel effect of the heat radiation, where the predictive model is set up by using radial basis kernel function based SVM (support vector machine method. Finally, simulation results are given to show the effectiveness of the proposed scheme.

  6. Performance confirmation operation of water environment control facility

    International Nuclear Information System (INIS)

    Magome, Hirokatsu; Okada, Yuji; Tomita, Kenji; Iida, Kazuhiro; Ando, Hitoshi; Yonekawa, Akihisa; Ueda, Haruyasu; Hanawa, Hiroshi; Kanno, Masaru; Sakuta, Yoshiyuki

    2015-09-01

    In Japan Atomic Energy Agency, in order to solve the problem in the long-term operation of a light water reactor, preparation which does the irradiation experiment of light-water reactor fuel and material was advanced. JMTR stopped after the 165th operation cycle in August 2006, and is advancing renewal of the irradiation facility towards re-operation. The material irradiation test facility was installed from 2008 fiscal year to 2012 fiscal year in JMTR. The material irradiation test facility is used for IASCC study, and consists of mainly three equipments. This report described performance operating test of the water environmental control facilities for IASCC study carried out 2013 fiscal year. (author)

  7. Development of wireless vehicle remote control for fuel lid operation

    Science.gov (United States)

    Sulaiman, N.; Jadin, M. S.; Najib, M. S.; Mustafa, M.; Azmi, S. N. F.

    2018-04-01

    Nowadays, the evolution of the vehicle technology had made the vehicle especially car to be equipped with a remote control to control the operation of the locking and unlocking system of the car’s door and rear’s bonnet. However, for the fuel or petrol lid, it merely can be opened from inside the car’s cabin by handling the fuel level inside the car’s cabin to open the fuel lid. The petrol lid can be closed by pushing the lid by hand. Due to the high usage of using fuel lever to open the fuel lid when refilling the fuel, the car driver might encounter the malfunction of fuel lid (fail to open) when pushing or pulling the fuel lever. Thus, the main aim of the research is to enhance the operation of an existing car remote control where the car fuel lid can be controlled using two techniques; remote control-based and smartphone-based. The remote control is constructed using Arduino microcontroller, wireless sensors and XCTU software to set the transmitting and receiving parameters. Meanwhile, the smartphone can control the operation of the fuel lid by communicating with Arduino microcontroller which is attached to the fuel lid using Bluetooth sensor to open the petrol lid. In order to avoid the conflict of instruction between wireless systems with the existing mechanical-based system, the servo motor will be employed to release the fuel lid merely after receiving the instruction from Arduino microcontroller and smartphone. As a conclusion, the prototype of the multipurpose vehicle remote control is successfully invented, constructed and tested. The car fuel lid can be opened either using remote control or smartphone in a sequential manner. Therefore, the outcome of the project can be used to serve as an alternative solution to solve the car fuel lid problem even though the problem rarely occurred.

  8. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  9. CNC Turning Center Advanced Operations. Computer Numerical Control Operator/Programmer. 444-332.

    Science.gov (United States)

    Skowronski, Steven D.; Tatum, Kenneth

    This student guide provides materials for a course designed to introduce the student to the operations and functions of a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 presents course expectations and syllabus, covers safety precautions, and describes the CNC turning center components, CNC…

  10. Coastal nonpoint pollution control program: Program development and approval guidance

    International Nuclear Information System (INIS)

    1993-01-01

    The document, developed by NOAA and EPA, contains guidance for states in developing and implementing their coastal nonpoint pollutant source programs. It describes the requirements that must be met, including: the geographic scope of the program; the pollutant sources to be addressed; the types of management measures used; the establishment of critical areas; technical assistance, public participation, and administrative coordination; and, the process for program submission and Federal approval. The document also contains the criteria by which NOAA and EPA will review the states' submissions

  11. Environmental program with operational cases to reduce risk to the marine environment significantly

    International Nuclear Information System (INIS)

    Cline, J.T.; Forde, R.

    1991-01-01

    In this paper Amoco Norway Oil Company's environmental program is detailed, followed by example operational programs and achievements aimed to minimize environmental risks to the marine environment at Valhall platform. With a corporate goal to be a leader in protecting the environment, the appropriate strategies and policies that form the basis of the environmental management system are incorporated in the quality assurance programs. Also, included in the program are necessary organizational structures, responsibilities of environmental affairs and line organization personnel, compliance procedures and a waste task force obliged to implement operations improvements. An internal environmental audit system has been initiated, in addition to corporate level audits, which, when communicated to the line organization closes the environmental management loop through experience feed back. Environmental projects underway are significantly decreasing the extent and/or risk of pollution from offshore activities. The cradle to grave responsibility is assumed with waste separated offshore and onshore followed by disposal in audited sites. A $5 MM program is underway to control produced oily solids and reduce oil in produced water aiming to less than 20 ppm. When oil-based mud is used in deeper hole sections, drill solids disposed at sea average less than 60 g oil/kg dry cuttings using appropriate shaker screens, and a washing/centrifuge system to remove fines. Certain oily liquid wastes are being injected down hole whereas previously they were burned using a mud burner. Finally, a program is underway with a goal to eliminate sea discharge of oil on cuttings through injection disposal of oily wastes, drilling with alternative muds such as a cationic water base mud, and/or proper onshore disposal of oily wastes

  12. TFTR neutral beam control and monitoring for DT operations

    International Nuclear Information System (INIS)

    O'Connor, T.; Kamperschroer, J.; Chu, J.

    1995-01-01

    Record fusion power output has recently been obtained in TFTR with the injection of deuterium and tritium neutral beams. This significant achievement was due in part to the controls, software, and data processing capabilities added to the neutral beam system for DT operations. Chief among these improvements was the addition of SUN workstations and large dynamic data storage to the existing Central Instrumentation Control and Data Acquisition (CICADA) system. Essentially instantaneous look back over the recent shot history has been provided for most beam waveforms and analysis results. Gas regulation controls allowing remote switchover between deuterium and tritium were also added. With these tools, comparison of the waveforms and data of deuterium and tritium for four test conditioning pulses quickly produced reliable tritium setpoints. Thereafter, all beam conditioning was performed with deuterium, thus saving the tritium supply for the important DT injection shots. The lookback capability also led to modifications of the gas system to improve reliability and to control ceramic valve leakage by backbiasing. Other features added to improve the reliability and availability of DT neutral beam operations included master beamline controls and displays, a beamline thermocouple interlock system, a peak thermocouple display, automatic gas inventory and cryo panel gas loading monitoring, beam notching controls, a display of beam/plasma interlocks, and a feedback system to control beam power based on plasma conditions

  13. Air Breathing Propulsion Controls and Diagnostics Research at NASA Glenn Under NASA Aeronautics Research Mission Programs

    Science.gov (United States)

    Garg, Sanjay

    2015-01-01

    The Intelligent Control and Autonomy Branch (ICA) at NASA (National Aeronautics and Space Administration) Glenn Research Center (GRC) in Cleveland, Ohio, is leading and participating in various projects in partnership with other organizations within GRC and across NASA, the U.S. aerospace industry, and academia to develop advanced controls and health management technologies that will help meet the goals of the NASA Aeronautics Research Mission Directorate (ARMD) Programs. These efforts are primarily under the various projects under the Advanced Air Vehicles Program (AAVP), Airspace Operations and Safety Program (AOSP) and Transformative Aeronautics Concepts Program (TAC). The ICA Branch is focused on advancing the state-of-the-art of aero-engine control and diagnostics technologies to help improve aviation safety, increase efficiency, and enable operation with reduced emissions. This paper describes the various ICA research efforts under the NASA Aeronautics Research Mission Programs with a summary of motivation, background, technical approach, and recent accomplishments for each of the research tasks.

  14. Simulation and operation of the EBR-II automatic control rod drive system

    International Nuclear Information System (INIS)

    Lehto, W.K.; Larson, H.A.; Dean, E.M.; Christensen, L.J.

    1985-01-01

    An automatic control rod drive system (ACRDS) installed at EBR-II produces shaped power transients from 40% to full reactor power at a linear ramp rate of 4 MWt/s. A digital computer and modified control-rod-drive provides this capability. Simulation and analysis of ACRDS experiments establish the safety envelope for reactor transient operation. Tailored transients are required as part of USDOE Operational Reliability Testing program for prototypic fast reactor fuel cladding breach behavior studies. After initial EBR-II driver fuel testing and system checkout, test subassemblies were subjected to both slow and fast transients. In addition, the ACRDS is used for steady-state operation and will be qualified to control power ascent from initial critical to full power

  15. Simulation and operation of the EBR-II automatic control rod drive system

    International Nuclear Information System (INIS)

    Lehto, W.K.; Larson, H.A.; Dean, E.M.; Christensen, L.J.

    1985-01-01

    An automatic control rod drive system (ACRDS) installed at EBR-II produces shaped power transients from 40% to full reactor power at a linear ramp rate of 4 MWt/s. A digital computer and modified control-rod-drive provides this capability. Simulation and analysis of ACRDS experiments establish the safety envelope for reactor transient operation. Tailored transients are required as part of USDOE Operational Reliability Testing program for prototypic fast reactor fuel cladding breach behavior studies. After initial EBR-II driver fuel testing and system checkout, test subassemblies were subjected to both slow and fast transients. In additions, the ACRDS is used for steady-state operation and will be qualified to control power ascent from initial critical to full power

  16. Site operator program final report for fiscal years 1992 through 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  17. Mitigating the Long term Operating Extreme Load through Active Control

    International Nuclear Information System (INIS)

    Koukoura, Christina; Natarajan, Anand

    2014-01-01

    The parameters influencing the long term extreme operating design loads are identified through the implementation of a Design of Experiment (DOE) method. A function between the identified critical factors and the ultimate out-of-plane loads on the blade is determined. Variations in the initial blade azimuth location are shown to affect the extreme blade load magnitude during operation in normal turbulence wind input. The simultaneously controlled operation of generator torque variation and pitch variation at low blade pitch angles is detected to be responsible for very high loads acting on the blades. Through gain scheduling of the controller (modifications of the proportional Kp and the integral K gains) the extreme loads are mitigated, ensuring minimum instantaneous variations in the power production for operation above rated wind speed. The response of the blade load is examined for different values of the integral gain as resulting in rotor speed error and the rate of change of rotor speed. Based on the results a new load case for the simulation of extreme loads during normal operation is also presented

  18. New operator assistance features in the CMS Run Control System

    Science.gov (United States)

    Andre, J.-M.; Behrens, U.; Branson, J.; Brummer, P.; Chaze, O.; Cittolin, S.; Contescu, C.; Craigs, B. G.; Darlea, G.-L.; Deldicque, C.; Demiragli, Z.; Dobson, M.; Doualot, N.; Erhan, S.; Fulcher, J. R.; Gigi, D.; Gładki, M.; Glege, F.; Gomez-Ceballos, G.; Hegeman, J.; Holzner, A.; Janulis, M.; Jimenez-Estupiñán, R.; Masetti, L.; Meijers, F.; Meschi, E.; Mommsen, R. K.; Morovic, S.; O'Dell, V.; Orsini, L.; Paus, C.; Petrova, P.; Pieri, M.; Racz, A.; Reis, T.; Sakulin, H.; Schwick, C.; Simelevicius, D.; Vougioukas, M.; Zejdl, P.

    2017-10-01

    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience.

  19. New Operator Assistance Features in the CMS Run Control System

    Energy Technology Data Exchange (ETDEWEB)

    Andre, J.M.; et al.

    2017-11-22

    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience.

  20. Job satisfaction among control room operators of electrical systems.

    Science.gov (United States)

    Macaia, Amanda A Silva; Marqueze, Elaine C; Rotenberg, Lúcia; Fischer, Frida Marina; Moreno, Claudia R C

    2012-01-01

    Shift workers from control centers of electrical systems are a group that has received little attention in Brazil. This study aimed to compare workers' job satisfaction at five control centers of a Brazilian company electrical system, and according to their job titles. The Organization Satisfaction Index (OSI) questionnaire to assess job satisfaction was used. ANOVA was used to compare OSI means, according to job title and control center. The results showed that there is no difference in job satisfaction among job titles, but a significant difference was found according to the control center. A single organizational culture cannot be applied to several branches. It is required to implement actions that would result in job satisfaction improvements among workers of all studied control rooms centers. The high level of education of operators working in all centers might have contributed to the similar values of perceived satisfaction among distinct job titles.