WorldWideScience

Sample records for program collaborative planning

  1. A Collaborative Approach to Transportation Planning: Federal and State Perspectives on Section 180(c) Program Development

    International Nuclear Information System (INIS)

    Macaluso, C.; Strong, T.; Janairo, L.; Helvey, E.

    2006-01-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) committed in its November 2003 Strategic Plan for the Safe Transportation of Spent Nuclear Fuel and High-Level Radioactive Waste to Yucca Mountain: A Guide to Stakeholder Interactions to develop the transportation system collaboratively with stakeholders. The Strategic Plan further stated that four state regional groups (SRGs) would be the 'anchors' for OCRWM's collaboration with the states. The first major transportation planning activity that OCRWM initiated after publication of the Strategic Plan was the development of the Section 180(c) grant program. This document describes that collaboration and its outcomes from the perspective of the OCRWM participants and one of the SRGs, the Council of State Governments - Midwestern Office (CSG Midwest). (authors)

  2. Logic Models: A Tool for Effective Program Planning, Collaboration, and Monitoring. REL 2014-025

    Science.gov (United States)

    Kekahio, Wendy; Lawton, Brian; Cicchinelli, Louis; Brandon, Paul R.

    2014-01-01

    A logic model is a visual representation of the assumptions and theory of action that underlie the structure of an education program. A program can be a strategy for instruction in a classroom, a training session for a group of teachers, a grade-level curriculum, a building-level intervention, or a district-or statewide initiative. This guide, an…

  3. Collaborative environments for capability-based planning

    Science.gov (United States)

    McQuay, William K.

    2005-05-01

    Distributed collaboration is an emerging technology for the 21st century that will significantly change how business is conducted in the defense and commercial sectors. Collaboration involves two or more geographically dispersed entities working together to create a "product" by sharing and exchanging data, information, and knowledge. A product is defined broadly to include, for example, writing a report, creating software, designing hardware, or implementing robust systems engineering and capability planning processes in an organization. Collaborative environments provide the framework and integrate models, simulations, domain specific tools, and virtual test beds to facilitate collaboration between the multiple disciplines needed in the enterprise. The Air Force Research Laboratory (AFRL) is conducting a leading edge program in developing distributed collaborative technologies targeted to the Air Force's implementation of systems engineering for a simulation-aided acquisition and capability-based planning. The research is focusing on the open systems agent-based framework, product and process modeling, structural architecture, and the integration technologies - the glue to integrate the software components. In past four years, two live assessment events have been conducted to demonstrate the technology in support of research for the Air Force Agile Acquisition initiatives. The AFRL Collaborative Environment concept will foster a major cultural change in how the acquisition, training, and operational communities conduct business.

  4. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    International Nuclear Information System (INIS)

    McNiven, A; Jaffray, D; Letourneau, D

    2015-01-01

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  5. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, A; Jaffray, D; Letourneau, D [Princess Margaret Cancer Centre and Department of Radiation Oncology, University of Toronto, Toronto, ON (Canada)

    2015-06-15

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  6. Collaborative Strategic Planning: Myth or Reality?

    Science.gov (United States)

    Mbugua, Flora; Rarieya, Jane F. A.

    2014-01-01

    The concept and practice of strategic planning, while entrenched in educational institutions in the West, is just catching on in Kenya. While literature emphasizes the importance of collaborative strategic planning, it does not indicate the challenges presented by collaboratively engaging in strategic planning. This article reports on findings of…

  7. Collaborative Strategic Planning in Higher Education

    Science.gov (United States)

    Sanaghan, Patrick

    2009-01-01

    This book outlines a simple, five-phase collaborative approach to strategic planning that has worked effectively on many campuses. Specifically, Collaborative Strategic Planning (CSP) refers to the disciplined and thoughtful process of meaningfully engaging relevant stakeholders in creating a shared future vision and goals for their institution.…

  8. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  9. VSP - Discussion: The Common Interest on Planning Hulls and Plan for Collaboration Studies between NSWC and KRISO - Washington DC

    Science.gov (United States)

    2016-03-07

    planning hulls and plan for N62909-15-1-2052 collaboration studies between NSWC and KRISO - Washington DC Sb. GRANT NUMBER N62909-15-1-2052 Sc. PROGRAM...be carried out in MASK’s facilities. We discussed common interests on planing hulls, and made plans for collaboration studies between NSWC and KRISO ...Presentation of USV project in KRISO 8/19/2015 (Wed) • Discussion of common interests about planing hu lls • Planning for collaboration studies

  10. Future Plans for the ACORNE Collaboration

    International Nuclear Information System (INIS)

    Thompson, Lee F

    2007-01-01

    A summary of the future plans for ACORNE collaboration are presented. Of particular note is the intended development of an acoustic calibrator to be deployed in the deep sea above the Rona hydrophone array. Crucial to this goal is work recently completed on the understanding of hydrophone response and the generation of bipolar acoustic signals; this work is presented in detail

  11. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  12. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen-sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo-cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  13. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen?sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo?cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  14. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  15. Remote Laboratory Collaboration Plan in Communications Engineering

    Directory of Open Access Journals (Sweden)

    Akram Ahmad Abu-aisheh

    2012-11-01

    Full Text Available Communications laboratories for electrical engineering undergraduates typically require that students perform practical experiments and document findings as part of their knowledge and skills development. Laboratory experiments are usally designed to support and reinforce theories presented in the classroom and foster independent thinking; however, the capital cost of equipment needed to sustain a viable laboratory environment is large and ongoing maintenance is an annual expense. Consequently, there is a need to identify and validate more economic solutions for engineering laboratories. This paper presents a remote laboratory collaboration plan for use in an elctrical engineering communications course.

  16. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  17. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  18. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  19. Implementation of a Web-Based Collaborative Process Planning System

    Science.gov (United States)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  20. Developing a strategic marketing plan for physical and occupational therapy services: a collaborative project between a critical access hospital and a graduate program in health care management.

    Science.gov (United States)

    Kash, Bita A; Deshmukh, A A

    2013-01-01

    The purpose of this study was to develop a marketing plan for the Physical and Occupational Therapy (PT/OT) department at a Critical Access Hospital (CAH). We took the approach of understanding and analyzing the rural community and health care environment, problems faced by the PT/OT department, and developing a strategic marketing plan to resolve those problems. We used hospital admissions data, public and physician surveys, a SWOT analysis, and tools to evaluate alternative strategies. Lack of awareness and negative perception were key issues. Recommended strategies included building relationships with physicians, partnering with the school district, and enhancing the wellness program.

  1. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  2. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  3. Interdisciplinary Collaboration in EHDI Programs

    Science.gov (United States)

    Nelson, Lauri; Houston, K. Todd; Hoffman, Jeff; Bradham, Tamala S.

    2011-01-01

    State coordinators of early hearing detection and intervention (EHDI) programs were asked to complete a strengths, weaknesses, opportunities, and threats, or SWOT, analysis that consisted of 12 evaluative areas of EHDI programs. For the interdisciplinary area, 47 coordinators responded with 224 items, and themes were identified within each SWOT…

  4. A Novel Approach for Collaborative Pair Programming

    Science.gov (United States)

    Goel, Sanjay; Kathuria, Vanshi

    2010-01-01

    The majority of an engineer's time in the software industry is spent working with other programmers. Agile methods of software development like eXtreme Programming strongly rely upon practices like daily meetings and pair programming. Hence, the need to learn the skill of working collaboratively is of primary importance for software developers.…

  5. ESnet Program Plan 1994

    Energy Technology Data Exchange (ETDEWEB)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  6. ESnet Program Plan 1994

    International Nuclear Information System (INIS)

    Merola, S.

    1994-01-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  7. International collaboration on CESR-TA program

    International Nuclear Information System (INIS)

    Flanagan, John; Suetsugu, Yusuke

    2009-01-01

    An international collaboration on the CESR-TA (Cornell Electron Storage Ring-Test Accelerator) program, which is a program to investigate electron cloud instability (ECI) issues in the positron damping ring of the ILC (International Linear-Collider), is currently underway a Cornell University, KEK is supporting the program through the development of an X-ray beam profile monitor system to measure the extremely small beam size, and through the development of clearing electrodes to mitigate the ECI. (author)

  8. Collaborative Planning: Cooking up an Inclusive Service-Learning Project

    Science.gov (United States)

    Bonati, Michelle L.

    2018-01-01

    Collaborative planning between special education teachers and general education teachers that focuses on curriculum, instruction, and assessment can improve learning outcomes for students with and without disabilities. Service-learning is a teaching practice that can provide a flexible approach for teachers to collaboratively plan to meet the…

  9. The Impact of a Primary Care Education Program Regarding Cancer Survivorship Care Plans: Results from an Engineering, Primary Care, and Oncology Collaborative for Survivorship Health.

    Science.gov (United States)

    Donohue, SarahMaria; Haine, James E; Li, Zhanhai; Trowbridge, Elizabeth R; Kamnetz, Sandra A; Feldstein, David A; Sosman, James M; Wilke, Lee G; Sesto, Mary E; Tevaarwerk, Amye J

    2017-09-20

    Survivorship care plans (SCPs) have been recommended as tools to improve care coordination and outcomes for cancer survivors. SCPs are increasingly being provided to survivors and their primary care providers. However, most primary care providers remain unaware of SCPs, limiting their potential benefit. Best practices for educating primary care providers regarding SCP existence and content are needed. We developed an education program to inform primary care providers of the existence, content, and potential uses for SCPs. The education program consisted of a 15-min presentation highlighting SCP basics presented at mandatory primary care faculty meetings. An anonymous survey was electronically administered via email (n = 287 addresses) to evaluate experience with and basic knowledge of SCPs pre- and post-education. A total of 101 primary care advanced practice providers (APPs) and physicians (35% response rate) completed the baseline survey with only 23% reporting prior receipt of a SCP. Only 9% could identify the SCP location within the electronic health record (EHR). Following the education program, primary care physicians and APPs demonstrated a significant improvement in SCP knowledge, including improvement in their ability to locate one within the EHR (9 vs 59%, p educational program containing information about SCP existence, content, and location in the EHR increased primary care physician and APP knowledge in these areas, which are prerequisites for using SCP in clinical practice.

  10. Collaborative Communication in Work Based Learning Programs

    Science.gov (United States)

    Wagner, Stephen Allen

    2017-01-01

    This basic qualitative study, using interviews and document analysis, examined reflections from a Work Based Learning (WBL) program to understand how utilizing digital collaborative communication tools influence the educational experience. The Community of Inquiry (CoI) framework was used as a theoretical frame promoting the examination of the…

  11. Lewis' Educational and Research Collaborative Internship Program

    Science.gov (United States)

    Heyward, Ann; Gott, Susan (Technical Monitor)

    2004-01-01

    The Lewis Educational and Research Collaborative Internship Program (LERCIP) is a collaborative undertaking by the Office of Educational Programs at NASA Glenn Research Center at Lewis Field (formerly NASA Lewis Research Center) and the Ohio Aerospace Institute. This program provides 10-week internships in addition to summer and winter extensions if funding is available and/or is requested by mentor (no less than 1 week no more than 4 weeks) for undergraduate/graduate students and secondary school teachers. Students who meet the travel reimbursement criteria receive up to $500 for travel expenses. Approximately 178 interns are selected to participate in this program each year and begin arriving the fourth week in May. The internships provide students with introductory professional experiences to complement their academic programs. The interns are given assignments on research and development projects under the personal guidance of NASA professional staff members. Each intern is assigned a NASA mentor who facilitates a research assignment. In addition to the research assignment, the summer program includes a strong educational component that enhances the professional stature of the participants. The educational activities include a research symposium and a variety of workshops, and lectures. An important aspect of the program is that it includes students with diverse social, cultural and economic backgrounds. The purpose of this report is to document the program accomplishments for 2004.

  12. Mistral: a program in collaboration with Japan

    International Nuclear Information System (INIS)

    Cabrillat, J.C.

    1997-01-01

    The MISTRAL (MOX investigation of Systems which are Technically Relevant of Advanced Light water reactors) experimental program is performed with the Eole reactor at Cadarache (France) in the framework of a collaboration between the CEA, Electricite de France (EdF), Framatome and the NUPEC Japanese organism. This low power experimental reactor is devoted to critical dimensioning configuration tests of light water reactor cores fueled exclusively with mixed uranium-plutonium oxide (MOX) fuels. This program follows the previous EPICURE program devoted to the study of partial MOX fueling of PWR cores. (J.S.)

  13. Collaborative applied research programs at AITF

    Energy Technology Data Exchange (ETDEWEB)

    Chow, Ross [Alberta Innovates Technology Futures (Canada)

    2011-07-01

    Alberta Innovates Technology Futures (AITF) is a 600 employee company created in 2010 and owned by the Alberta government; offices are located in Edmonton, Devon, Vegreville and Calgary. The purpose of this document is to present the services provided by AITF. The company provides technical support and advisory services as well as commercialization support, they provide the link between the concept stage and the commercialization stage. AITF proposes collaborative programs which can be consortia made up of a series of projects on general industry issues or joint industry projects which focus on a specific issue. During this presentation, a joint industry project, the fuels and lubricants exchange program, was presented along with several consortia such as the carbonate research program, the materials and reliability in oil sands program, and the AACI program. This presentation highlighted the work carried out by AITF to meet the needs of their clients.

  14. Collaborative Research Program on Seafood Toxins

    Science.gov (United States)

    1988-08-14

    Crystallographic Structures of Saxitoxins Cl and C2 Appendix C: Collaborative Research Program an Seafcod Toxins Progress Report on Ciguatera and Related...radioimmunoassay for PSP were also evalumted. The Hokama stick test for ciguatera toxin was also evaluated. 4. initiate Studies on the Accumulation...tco•d which caie a form of b-mnn poisoning referred to as ciguatera . The respcnsible toxins originate from ll1ular rine algae of the division

  15. National transuranic program plan

    International Nuclear Information System (INIS)

    1994-01-01

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic wasteclose quotes. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial

  16. The Death and Life of Collaborative Planning Theory

    OpenAIRE

    Robert Goodspeed

    2016-01-01

    It has been over 20 years since Judith Innes proclaimed communicative action to be the “emerging paradigm” for planning theory, a theoretical perspective which has been developed into what is known as collaborative planning theory (CPT). With planning theory shifting to a new generation of scholars, this commentary considers the fate of this intellectual movement within planning. CPT never achieved the paradigmatic status its advocates desired because of its internal diversity and limited sco...

  17. A concept for collaborative supply chain planning

    DEFF Research Database (Denmark)

    Alfnes, E.; Dreyer, H.C.; Hvolby, Hans-Henrik

    2012-01-01

    The main challenge for many manufacturers is the increased complexity of the supply chain, and as supply chains get more complicated enterprises require better tools for supply chain planning and execution. Many vendors offer systems to plan and control in-house operations, whereas mainly large...... vendors such as Oracle, SAP and I2 offer supply chain planning systems. This limits the ability for SMEs to exploit the supply chain planning options. This paper is part of a research project carried out to develop a new supply chain add-on for Microsoft AX, a very common system for SMEs. The paper...... discusses current supply chain planning solutions and presents a more simple and adaptive concept to be used in both SMEs and larger enterprises....

  18. Collaborative Lesson Planning as Professional Development for Beginning Primary Teachers

    Science.gov (United States)

    Bauml, Michelle

    2014-01-01

    This qualitative case study describes how one beginning primary grade teacher benefited from collaborative lesson-planning meetings with her grade-level colleagues. The teacher accumulated knowledge of curriculum, pedagogy, and professional contexts as she participated in planning meetings each week during her first year of teaching. Furthermore,…

  19. Improved Collaborative Transport Planning at Dutch Logistics Service Provider Fritom

    NARCIS (Netherlands)

    Buijs, Paul; Lopez Alvarez, Jose Alejandro; Veenstra, Marjolein; Roodbergen, Kees Jan

    2016-01-01

    We study the collaborative transport planning for two autonomous business units of Fritom, a Dutch logistics service provider. This difficult planning problem does not fit any existing type of vehicle routing problem proposed in the academic literature; therefore, we define a new problem class, the

  20. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  1. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  2. FFTF-cycle 10 program and future plan

    Science.gov (United States)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  3. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  4. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  5. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  6. Neutrino Factory and Muon Collider Collaboration R and D Program

    International Nuclear Information System (INIS)

    Zisman, M.S.

    2000-01-01

    The Neutrino Factory and Muon Collider Collaboration (MC) comprises some 140 scientists and engineers located at U.S. National Laboratories and Universities, and at a number of non-U.S. research institutions. In the past year, the MC R and D program has shifted its focus mainly toward the design issues related to the development of a Neutrino Factory based on a muon storage ring. In this paper the status of the various R and D activities is described, and future plans are outlined

  7. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  8. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  9. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  10. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  11. Magnetic Fusion Program Plan

    International Nuclear Information System (INIS)

    1985-02-01

    This Plan reflects the present conditions of the energy situation and is consistent with national priorities for the support of basic and applied research. It is realistic in taking advantage of the technical position that the United States has already established in fusion research to make cost-effective progress toward the development of fusion power as a future energy option

  12. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  13. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  14. Nuclear physics program plan

    International Nuclear Information System (INIS)

    1985-11-01

    The nuclear physics program objectives, resources, applications and implications of scientific opportunities are presented. The scope of projected research is discussed in conjunction with accelerator facilities and manpower. 25 figs., 2 tabs

  15. Developing health and social care planning in collaboration.

    Science.gov (United States)

    Rämgård, Margareta; Blomqvist, Kerstin; Petersson, Pia

    2015-01-01

    Collaboration between different professions in community care for older people is often both difficult and complex. In this project, a participatory action research (PAR) was conducted in order to support the professions involved in the care for older people to develop individualized health and social care plans. Cases from daily work were discussed in different professional groups over a period of one year. A key finding was that lack of knowledge regarding the other professions' field of expertise and their underlying professional culture and values was a barrier in their collaboration. However, as the continuous reflective dialogue process progressed, the participants began to reflect more about the importance of collaboration as a prerequisite to achieve the best possible care for the recipient. This process of reflection led to the often complex needs of the care recipients being given a more central position and thus care plans being better tailored to each person's needs.

  16. Collaboration on DIII-D Five Year Plan

    International Nuclear Information System (INIS)

    Allen, S

    2003-01-01

    This document summarizes Lawrence Livermore National Laboratory's (LLNL) plan for fusion research on the DIII-D Tokamak, located at General Atomics (GA) in San Diego, California, in the time period FY04-FY08. This document is a companion document to the DIII-D Five-Year Program Plan; which hereafter will be referred to as the ''D3DPP''. The LLNL Collaboration on DIII-D is a task-driven program in which we bring to bear the full range of expertise needed to complete specific goals of plasma science research on the DIII-D facility. This document specifies our plasma performance and physics understanding goals and gives detailed plans to achieve those goals in terms of experimental leadership, code development and analysis, and diagnostic development. Our program is designed to be consistent with the long-term mission of the DIII-D program as documented in the D3DPP. The overall DIII-D Program mission is ''to establish the scientific basis for the optimization of the tokamak approach to fusion energy production''. LLNL Magnetic Fusion Energy (MFE) supports this mission, and we contribute to two areas of the DIII-D program: divertor physics and advanced tokamak (AT) physics. We lead or contribute to the whole cycle of research: experimental planning, diagnostic development, execution of experiments, and detailed analysis. We plan to continue this style in the next five years. DIII-D has identified three major research themes: AT physics, confinement physics, and mass transport. The LLNL program is part of the AT theme: measurement of the plasma current profile, and the mass transport theme: measurement and modeling of plasma flow. In the AT area, we have focused on the measurement and modeling of the current profile in Advanced Tokamak plasmas. The current profile, and it's effect on MHD stability of the high-β ''AT'' plasma are at the heart of the DIII-D program. LLNL has played a key role in the development of the Motional Stark Effect (MSE) diagnostic. Starting

  17. Strengths of the Business Plan and Industrial Collaboration ...

    African Journals Online (AJOL)

    The study was conducted to identify the strengths of business plan and industrial collaboration strategies in the teaching of entrepreneurship in tertiary institutions. The study was a survey and was conducted using 63 business educators in tertiary institutions in Anambra State, Nigeria. Two research questions and two null ...

  18. WIPP facility representative program plan

    International Nuclear Information System (INIS)

    1994-01-01

    This plan describes the Department of Energy (DOE), Carlsbad Area Office (CAO) facility representative (FR) program at the Waste Isolation Pilot Plant (WIPP). It provides the following information: (1) FR and support organization authorities and responsibilities; (2) FR program requirements; and (3) FR training and qualification requirements

  19. The Death and Life of Collaborative Planning Theory

    Directory of Open Access Journals (Sweden)

    Robert Goodspeed

    2016-11-01

    Full Text Available It has been over 20 years since Judith Innes proclaimed communicative action to be the “emerging paradigm” for planning theory, a theoretical perspective which has been developed into what is known as collaborative planning theory (CPT. With planning theory shifting to a new generation of scholars, this commentary considers the fate of this intellectual movement within planning. CPT never achieved the paradigmatic status its advocates desired because of its internal diversity and limited scope. However, its useful combination of analytical and normative insights is attracting the interest of a new generation of researchers, who are subjecting it to rigorous empirical testing and addressing longstanding theoretical weaknesses. Like Jane Jacob’s classic book the Death and Life of Great American Cities, CPT has made an enduring impact on planning theory, even as it has failed to achieve a total revolution in thinking.

  20. A Study on planning of the international collaboration foundation for the Advanced Nuclear Technology Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Moon Hee; Kim, H. R.; Kim, H. J. and others

    2005-03-15

    Korea has participated in the international collaboration programs for the development of future nuclear energy systems driven by the countries holding advanced nuclear technology and Korea and U.S. have cooperated in the INERI. This study aimed mainly at developing the plan for participation in the collaborative development of the Gen IV, searching the participation strategy for INERI and the INPRO, and the international cooperation in these programs. Contents and scope of the study for successful achievement are as follows; Investigation and analysis of international and domestic trends related to advanced nuclear technologies, Development of the plan for collaborative development of the Gen IV and conducting the international cooperation activities, Support for the activities related to I-NERI between Korea and U.S. and conducting the international cooperation, International cooperation activities for the INPRO. This study can be useful for planning the research plan and setting up of the strategy of integrating the results of the international collaboration and the domestic R and D results by combining the Gen IV and the domestic R and D in the field of future nuclear technology. Futhermore, this study can contribute to establishing the effective foundation and broadening the cooperation activities not only with the advanced countries for acquisition of the advanced technologies but also with the developing countries for the export of the domestic nuclear energy systems.

  1. A Study on planning of the international collaboration foundation for the Advanced Nuclear Technology Development Project

    International Nuclear Information System (INIS)

    Chang, Moon Hee; Kim, H. R.; Kim, H. J. and others

    2005-03-01

    Korea has participated in the international collaboration programs for the development of future nuclear energy systems driven by the countries holding advanced nuclear technology and Korea and U.S. have cooperated in the INERI. This study aimed mainly at developing the plan for participation in the collaborative development of the Gen IV, searching the participation strategy for INERI and the INPRO, and the international cooperation in these programs. Contents and scope of the study for successful achievement are as follows; Investigation and analysis of international and domestic trends related to advanced nuclear technologies, Development of the plan for collaborative development of the Gen IV and conducting the international cooperation activities, Support for the activities related to I-NERI between Korea and U.S. and conducting the international cooperation, International cooperation activities for the INPRO. This study can be useful for planning the research plan and setting up of the strategy of integrating the results of the international collaboration and the domestic R and D results by combining the Gen IV and the domestic R and D in the field of future nuclear technology. Futhermore, this study can contribute to establishing the effective foundation and broadening the cooperation activities not only with the advanced countries for acquisition of the advanced technologies but also with the developing countries for the export of the domestic nuclear energy systems

  2. A Study on planning of promotion for international collaborative development of Generation IV Nuclear Energy Systems

    International Nuclear Information System (INIS)

    Hee, Chang Moon; Yang, M. S.; Ha, J. J.

    2006-06-01

    Korea has participated in the international collaboration programs for the development of future nuclear energy systems driven by the countries holding advanced nuclear technology and Korea and U. S. have cooperated in the INERI. This study is mainly at developing the plan for participation in the collaborative development of the Gen IV, searching the participation strategy for INERI and the INPRO, and the international cooperation in these programs. Contents and scope of the study for successful achievement are as follows; - Investigation and analysis of international and domestic trends related to advanced nuclear technologies - Development of the plan for collaborative development of the Gen IV and conducting the international cooperation activities - Support for the activities related to I-NERI between Korea and U. S. and conducting the international cooperation - International cooperation activities for the INPRO This study can be useful for planning the research plan and setting up of the strategy of integrating the results of the international collaboration and the domestic R and D results by combining the Gen IV and the domestic R and D in the field of future nuclear technology. Furthermore, this study can contribute to establishing the effective foundation and broadening the cooperation activities not only with the advanced countries for acquisition of the advanced technologies but also with the developing countries for the export of the domestic nuclear energy systems

  3. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  4. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  5. First regional CSM program planned.

    Science.gov (United States)

    1982-09-01

    6 countries in the English-speaking Caribbean (Antigua, Barbados, Dominica, St. Kitts/Nevis, St. Lucia, and St. Vincent) are scheduled to form the 1st regional contraceptive social marketing program. The program will be under the auspices of the Barbados Family Planning Association. By combining resources, contraceptive social marketing should be able to effectively augment family planning activities in smaller countries where individual programs wuld be too costly. The regional program will also determine whether program elements from 1 country in a region are relevant in other countries. The Caribbean region as a whole has experienced a general decline in both crude birth rates and fertility rates during the past 15 years; however, adolescent fertility rates remain high and an average of 46% of the populations of Caribbean countries are under 15 years of age. Although heavy emigration has traditionally curbed population increases, new restrictive immigration laws are expected. Further increases in the working age population will contribute to already high unemployment rates and hinder economic development. The 6 countries selected for the social marketing program are receptive to innovative family planning approaches and have the basic marketing infrastructure required. Community-based distribution programs already in operation in these countries distribute condoms, oral contraceptives, and barrier methods. The success of these programs has plateaued, and there is a need for delivery systems capable of reaching broader segments of the population. The social marketing program will be phased in to ensure local acceptance among national leaders and consumers. The regional program hopes to borrow elements from Jamaica's contraceptive social marketing program to avoid the costs involved in starting a program from scratch. A major innovation will be the use of mass media advertising for contraceptives.

  6. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  7. Program Collaboration and Service Integration At-a-Glance

    Centers for Disease Control (CDC) Podcasts

    Dr. Kevin A. Fenton, Director of CDC's National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention, discusses program collaboration and service integration, a strategy that promotes better collaboration between public health programs and supports appropriate service integration at the point-of-care.

  8. Bottom head failure program plan

    International Nuclear Information System (INIS)

    Meyer, R.O.

    1989-01-01

    Earlier this year the NRC staff presented a Revised Severe Accident Research Program Plan (SECY-89-123) to the Commission and initiated work on that plan. Two of the near-term issues in that plan involve failure of the bottom head of the reactor pressure vessel. These two issues are (1) depressurization and DCH and (2) BWR Mark I Containment Shell Meltthrough. ORNL has developed models for several competing failure mechanisms for BWRs. INEL has performed analytical and experimental work directly related to bottom head failure in connection with several programs. SNL has conducted a number of analyses and experimental activities to examine the failure of LWR vessels. In addition to the government-sponsored work mentioned above, EPRI and FAI performed studies on vessel failure for the Industry Degraded Core Rulemaking Program (IDCOR). EPRI examined the failure of a PWR vessel bottom head without penetrations, as found in some Combustion Engineering reactors. To give more attention to this subject as called for by the revised Severe Accident Research Plan, two things are being done. First, work previously done is being reviewed carefully to develop an overall picture and to determine the reliability of assumptions used in those studies. Second, new work is being planned for FY90 to try to complete a reasonable understanding of the failure process. The review and planning are being done in close cooperation with the ACRS. Results of this exercise will be presented in this paper

  9. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  10. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  11. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  12. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  13. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  14. Collaborative Potential between National Estuary Programs ...

    Science.gov (United States)

    Estuaries are among the most productive ecosystems in the world, providing unique habitat for freshwater and marine species as well as valuable social and economic benefits. The wealth of ecosystem goods and services from estuaries has led to growth and development of human communities in adjacent areas and an increase in human activities that can adversely affect water quality and critical habitat. Managing for sustainable estuaries requires a balance of environmental concerns with community social and economic values. This has created an opportunity to leverage Environmental Protection Agency (EPA) scientific knowledge and tools with National Estuary Program (NEP) planning and management expertise to address environmental challenges in important estuarine ecosystems. The non-regulatory National Estuary Program (NEP) was outlined in the Clean Water Act to provide stakeholders an opportunity to monitor and manage ‘nationally significant’ estuaries. Currently there are 28 estuaries in the NEP, broadly distributed across the Atlantic, Pacific and Gulf Coasts, and in Puerto Rico. The local NEP management conferences must address a variety of environmental issues, from water quality and natural resources to coastal and watershed development. While the underlying objectives of each NEP are quite similar, each has unique landscapes, land uses, waterbodies, habitats, biological resources, economies and social culture. Consequently, the effects and severity of anthr

  15. Planning-Programming-Budgeting Systems.

    Science.gov (United States)

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  16. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  17. 20 CFR 632.255 - Program planning.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described in...

  18. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  19. Collaborative Structures in a Graduate Program

    Science.gov (United States)

    Otty, Robyn; Milton, Lauren

    2016-01-01

    This chapter describes the Centralized Service Learning Model (CSLM), a collaborative-teaching structure that connects two separate courses with one service-learning project. We discuss the lessons learned from applying the CSLM in our courses.

  20. Collaborative training program in coastal management in the Philippines: a local initiative with a global perspective

    OpenAIRE

    Balgos, M.C.

    1995-01-01

    A collaborative project in developing a broad-based coastal management training program in the Philippines is being undertaken by a group of government and nongovernment agencies. It addresses the lack of expertise in planning an implementation for coastal management in the country. The process will be documented to serve as a guide in starting and maintaining the process of collaborative training in coastal management in the region. Other training initiatives are outlined including regional ...

  1. ‘Strategic navigation’ in collaborative innovation planning processes

    DEFF Research Database (Denmark)

    Hansen, Jesper Rohr

    2013-01-01

    Today’s planning dilemmas for the urban fringe in western cities can be perceived of as a struggle between self-organization and control. This is pertinent in times of austerity. Public planning authorities are dependent on cross-sector collaboration in order to enhance the urban development...... leads to the formulation of an analytical model that can be used in future studies of leadership emergence in the urban fringe....... of city areas in the urban fringes, such as brown field and suburbs. Urban planning needs to develop practices of ‘strategic navigation’ (Jean Hillier) in order to come up with new type of responses for this type of dilemma. These practices of navigation emerge in uncertain environments, in which several...

  2. Collaborating with Industry to Enhance Financial Planning and Accounting Education

    Directory of Open Access Journals (Sweden)

    Mark Brimble

    2012-11-01

    Full Text Available Higher education is integral to the professionalisation of financial planning in Australia. However, thetraditional separation between ‘content’ and ‘practice’ in tertiary curriculum does not necessarily equipstudents with the skills required to apply the content in a professional context. Contextualisation of thefinancial planning curriculum requires collaboration between higher education institutions and the professionto develop authentic learning environments, such as work-integrated learning (WIL. This paper describes thecollaboration by one Australian university to develop a professionally integrated Financial Planning andAccounting degree and provides evidence of its impact from an industry perspective. The results reveal a highlevel of industry satisfaction with the degree, substantial professional integration, as well as the developmentof students’ professional skills. Students also developed an improved impression of the university, its studentsand its staff.

  3. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  4. ACE: A Collaborative School Consultation Program for Secondary School Teachers

    Science.gov (United States)

    Couture, Caroline; Massé, Line

    2014-01-01

    This article presents a description of ACE (Accompagnement collaboratif des enseignants (Collaborative teacher accompaniment)), a new program designed to guide secondary school teachers in integrating students with behavioral problems in their classrooms. ACE proposes collaborative accompaniment inspired by behavioral and mental health…

  5. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  6. Program Collaboration and Service Integration At-a-Glance

    Centers for Disease Control (CDC) Podcasts

    2010-09-15

    Dr. Kevin A. Fenton, Director of CDC's National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention, discusses program collaboration and service integration, a strategy that promotes better collaboration between public health programs and supports appropriate service integration at the point-of-care.  Created: 9/15/2010 by National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention.   Date Released: 9/15/2010.

  7. Mobile, Collaborative Situated Knowledge Creation for Urban Planning

    Directory of Open Access Journals (Sweden)

    Nelson Baloian

    2012-05-01

    Full Text Available Geo-collaboration is an emerging research area in computer sciences studying the way spatial, geographically referenced information and communication technologies can support collaborative activities. Scenarios in which information associated to its physical location are of paramount importance are often referred as Situated Knowledge Creation scenarios. To date there are few computer systems supporting knowledge creation that explicitly incorporate physical context as part of the knowledge being managed in mobile face-to-face scenarios. This work presents a collaborative software application supporting visually-geo-referenced knowledge creation in mobile working scenarios while the users are interacting face-to-face. The system allows to manage data information associated to specific physical locations for knowledge creation processes in the field, such as urban planning, identifying specific physical locations, territorial management, etc.; using Tablet-PCs and GPS in order to geo-reference data and information. It presents a model for developing mobile applications supporting situated knowledge creation in the field, introducing the requirements for such an application and the functionalities it should have in order to fulfill them. The paper also presents the results of utility and usability evaluations.

  8. N Reactor Deactivation Program Plan

    International Nuclear Information System (INIS)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities · in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually

  9. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  10. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  11. Single Shell Tank (SST) Program Plan

    International Nuclear Information System (INIS)

    HAASS, C.C.

    2000-01-01

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000

  12. Performance-based planning and programming guidebook.

    Science.gov (United States)

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  13. Single Shell Tank (SST) Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  14. Evaluation of a collaborative model: a case study analysis of watershed planning in the intermountain west

    Science.gov (United States)

    Gary Bentrup

    2001-01-01

    Collaborative planning processes have become increasingly popular for addressing environmental planning issues, resulting in a number of conceptual models for collaboration. A model proposed by Selin and Chavez suggests that collaboration emerges from a series of antecedents and then proceeds sequentially through problem-setting, direction-setting, implementation, and...

  15. Reducing nonpoint source pollution through collaboration: policies and programs across the U.S. States.

    Science.gov (United States)

    Hardy, Scott D; Koontz, Tomas M

    2008-03-01

    Nonpoint source (NPS) pollution has emerged as the largest threat to water quality in the United States, influencing policy makers and resource managers to direct more attention toward NPS prevention and remediation. In response, the United States Environmental Protection Agency (USEPA) spent more than $204 million in fiscal year (FY) 2006 on the Clean Water Act's Section 319 program to combat NPS pollution, much of it on the development and implementation of watershed-based plans. State governments have also increasingly allocated financial and technical resources to collaborative watershed efforts within their own borders to fight NPS pollution. With increased collaboration among the federal government, states, and citizens to combat NPS pollution, more information is needed to understand how public resources are being used, by whom, and for what, and what policy changes might improve effectiveness. Analysis from a 50-state study suggests that, in addition to the average 35% of all Section 319 funds per state that are passed on to collaborative watershed groups, 35 states have provided financial assistance beyond Section 319 funding to support collaborative watershed initiatives. State programs frequently provide technical assistance and training, in addition to financial resources, to encourage collaborative partnerships. Such assistance is typically granted in exchange for requirements to generate a watershed action plan and/or follow a mutually agreed upon work plan to address NPS pollution. Program managers indicated a need for greater fiscal resources and flexibility to achieve water quality goals.

  16. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  17. Atomic physics with highly-charged heavy ions at the GSI future facility: The scientific program of the SPARC collaboration

    International Nuclear Information System (INIS)

    Stoehlker, Th.; Beier, T.; Beyer, H.F.; Bosch, F.; Braeuning-Demian, A.; Gumberidze, A.; Hagmann, S.; Kozhuharov, C.; Kuehl, Th.; Liesen, D.; Mann, R.; Mokler, P.H.; Quint, W.; Schuch, R.; Warczak, A.

    2005-01-01

    In the current report a short overview about the envisioned program of the atomic physics research collaboration SPARC (Stored Particle Atomic Research Collaboration, at the new international accelerator Facility for Antiproton and Ion Research (FAIR) at GSI is given. In addition, a condensed description of the planned experimental areas devoted to atomic physics research at the new facility is presented

  18. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  19. Pollution prevention program plan 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE's commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE's routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations

  20. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  1. Pilot chargeback system program plan

    International Nuclear Information System (INIS)

    Smith, P.

    1997-03-01

    This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management

  2. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  3. LLNL Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs

  4. Collaboration between colleagues in teaching professional development programs

    Directory of Open Access Journals (Sweden)

    Patrícia Meyer

    2018-05-01

    Full Text Available Although collaboration is valued in the discourses of teachers, managers and institutions, as well as recognized as essential for innovation in universities, the culture of individualism is the one that permeates university professors’ performance. This study aims to analyze teaching professional development programs undertaken at four universities (one international and three national, from the perspective of promoting peer collaboration. The analysis occurred through the collection of publications or websites that described them. The teaching professional development programs analyzed have peer collaboration as a premise and encourage the socialization of experiences in courses, forums and other continuing education events. However, it is observed the need for strategy diversification, such as mentorship, incentive to online activities and development of collective projects, so that collaboration can really be a pillar in the pedagogical continuing education, lifelong learning, as well as in the reconfiguration and innovation of university professors’ practices.

  5. 76 FR 13404 - Cancer Therapy Evaluation Program Intellectual Property Option to Collaborator

    Science.gov (United States)

    2011-03-11

    ... Option to Collaborator AGENCY: National Institutes of Health, HHS. ACTION: Notice. SUMMARY: The National... Cancer Therapy Evaluation Program's Intellectual Property Option to Collaborator. [[Page 13405... Evaluation Program (CTEP)'s Intellectual Property Option to Collaborator. The proposed revision represents a...

  6. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  7. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  8. Enhancing Family Literacy through Collaboration: Program Considerations.

    Science.gov (United States)

    Tice, Carolyn J.

    2000-01-01

    Presents findings from a two-year evaluation of a family literacy program in rural Appalachian Ohio. Demonstrates positive results for both impact/outcome and process objectives. Highlights an extensive network of interpersonal and interagency relationships that maximized resources and supported families as they changed. Suggests the importance of…

  9. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  10. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  11. Disposal phase experimental program plan

    International Nuclear Information System (INIS)

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes

  12. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  13. Multicenter Collaborative Quality Assurance Program for the Province of Ontario, Canada: First-Year Results

    International Nuclear Information System (INIS)

    Létourneau, Daniel; McNiven, Andrea; Jaffray, David A.

    2013-01-01

    Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreement was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields

  14. LLNL Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    1990-05-01

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). Now legislation at the federal level is being introduced. Passage will result in new EPA regulations and also DOE orders. At the state level the Hazardous Waste Reduction and Management Review Act of 1989 was signed by the Governor. DHS is currently promulgating regulations to implement the new law. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements

  15. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  16. Integrated production-distribution planning optimization models: A review in collaborative networks context

    Directory of Open Access Journals (Sweden)

    Beatriz Andres

    2017-01-01

    Full Text Available Researchers in the area of collaborative networks are more and more aware of proposing collaborative approaches to address planning processes, due to the advantages associated when enterprises perform integrated planning models. Collaborative production-distribution planning, among the supply network actors, is considered a proper mechanism to support enterprises on dealing with uncertainties and dynamicity associated to the current markets. Enterprises, and especially SMEs, should be able to overcome the continuous changes of the market by increasing their agility. Carrying out collaborative planning allows enterprises to enhance their readiness and agility for facing the market turbulences. However, SMEs have limited access when incorporating optimization tools to deal with collaborative planning, reducing their ability to respond to the competition. The problem to solve is to provide SMEs affordable solutions to support collaborative planning. In this regard, new optimisation algorithms are required in order to improve the collaboration within the supply network partners. As part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET research project, this paper presents a study on integrated production and distribution plans. The main objective of the research is to identify gaps in current optimization models, proposed to address integrated planning, taking into account the requirements and needs of the industry. Thus, the needs of the companies belonging to the industrial pilots, defined in the C2NET project, are identified; analysing how these needs are covered by the optimization models proposed in the literature, to deal with the integrated production-distribution planning.

  17. Collaborative planning for city development. A perspective from a city planner

    Directory of Open Access Journals (Sweden)

    Kamalia Purbani

    2017-04-01

    Full Text Available A number of definitions related to collaborative governance have been developed since early 2000. The common characteristics of collaborative governance are, among others, policy consensus, community visioning, consensus rule-making, and collaborative network structures. Collaborative planning is a new paradigm of planning for a complex contemporary society through which it encourages people to be engaged in a dialogue in a situation of equal empowerment and shared information to learn new ideas through mutual understanding, to create innovative outcomes and to build institutional capacity. This indicates that collaborative planning can provide policy makers with more effective community participation. Collaborative process is the key of collaborative planning which also emphasizes the significant role of collaborative leadership. The process includes a participatory activity of dialogue oriented to the joint decision and summarized in a collaborative process. The collaborative leadership is crucial for setting and maintaining clear ground rules, building trust, facilitating dialogue, and exploring mutual gains. Along with the shift of planning paradigm, the role of city planner will also change since the city planning deals with the political process. In the political process, city planners must be able to perform as technocrats, bureaucrats, lawyers and politicians who always uphold their ethics because they are responsible to the society, the assignor for their integrity and professionalism.

  18. Social Networking Tools to Facilitate Cross-Program Collaboration

    Science.gov (United States)

    Wallace, Paul; Howard, Barbara

    2010-01-01

    Students working on a highly collaborative project used social networking technology for community building activities as well as basic project-related communication. Requiring students to work on cross-program projects gives them real-world experience working in diverse, geographically dispersed groups. An application used at Appalachian State…

  19. What is Program Collaboration and Service Integration (PCSI)?

    Centers for Disease Control (CDC) Podcasts

    2009-12-07

    This podcast provides a description of Program Collaboration and Service Integration (PCSI).  Created: 12/7/2009 by National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention (NCHHSTP).   Date Released: 12/7/2009.

  20. Review of the Strategic Plan for International Collaboration on Fusion Science and Technology Research. Fusion Energy Sciences Advisory Committee (FESAC)

    International Nuclear Information System (INIS)

    1998-01-01

    The United States Government has employed international collaborations in magnetic fusion energy research since the program was declassified in 1958. These collaborations have been successful not only in producing high quality scientific results that have contributed to the advancement of fusion science and technology, they have also allowed us to highly leverage our funding. Thus, in the 1980s, when the funding situation made it necessary to reduce the technical breadth of the U.S. domestic program, these highly leveraged collaborations became key strategic elements of the U.S. program, allowing us to maintain some degree of technical breadth. With the recent, nearly complete declassification of inertial confinement fusion, the use of some international collaboration is expected to be introduced in the related inertial fusion energy research activities as well. The United States has been a leader in establishing and fostering collaborations that have involved scientific and technological exchanges, joint planning, and joint work at fusion facilities in the U.S. and worldwide. These collaborative efforts have proven mutually beneficial to the United States and our partners. International collaborations are a tool that allows us to meet fusion program goals in the most effective way possible. Working with highly qualified people from other countries and other cultures provides the collaborators with an opportunity to see problems from new and different perspectives, allows solutions to arise from the diversity of the participants, and promotes both collaboration and friendly competition. In short, it provides an exciting and stimulating environment resulting in a synergistic effect that is good for science and good for the people of the world.

  1. Strategic plan for the restructured US fusion energy sciences program

    International Nuclear Information System (INIS)

    1996-08-01

    This plan reflects a transition to a restructured fusion program, with a change in focus from an energy technology development program to a fusion energy sciences program. Since the energy crisis of the early 1970's, the U.S. fusion program has presented itself as a goal- oriented fusion energy development program, with milestones that required rapidly increasing budgets. The Energy Policy Act of 1992 also called for a goal-oriented development program consistent with the Department's planning. Actual funding levels, however, have forced a premature narrowing of the program to the tokamak approach. By 1995, with no clear, immediate need driving the schedule for developing fusion energy and with enormous pressure to reduce discretionary spending, Congress cut fusion program funding for FY 1996 by one-third and called for a major restructuring of the program. Based on the recommendations of the Fusion Energy Advisory Committee (FEAC), the Department has decided to pursue a program that concentrates on world-class plasma, science, and on maintaining an involvement in fusion energy science through international collaboration. At the same time, the Japanese and Europeans, with energy situations different from ours, are continuing with their goal- oriented fusion programs. Collaboration with them provides a highly leveraged means of continued involvement in fusion energy science and technology, especially through participation in the engineering and design activities of the International Thermonuclear Experimental Reactor program, ITER. This restructured fusion energy sciences program, with its focus on fundamental fusion science and technology, may well provide insights that lead to more attractive fusion power plants, and will make use of the scientific infrastructure that will allow the United States to launch a fusion energy development program at some future date

  2. Fusion Simulation Program Execution Plan

    International Nuclear Information System (INIS)

    Brooks, Jeffrey

    2011-01-01

    The overall science goal of the FSP is to develop predictive simulation capability for magnetically confined fusion plasmas at an unprecedented level of integration and fidelity. This will directly support and enable effective U.S. participation in research related to the International Thermonuclear Experimental Reactor (ITER) and the overall mission of delivering practical fusion energy. The FSP will address a rich set of scientific issues together with experimental programs, producing validated integrated physics results. This is very well aligned with the mission of the ITER Organization to coordinate with its members the integrated modeling and control of fusion plasmas, including benchmarking and validation activities. [1]. Initial FSP research will focus on two critical areas: 1) the plasma edge and 2) whole device modeling including disruption avoidance. The first of these problems involves the narrow plasma boundary layer and its complex interactions with the plasma core and the surrounding material wall. The second requires development of a computationally tractable, but comprehensive model that describes all equilibrium and dynamic processes at a sufficient level of detail to provide useful prediction of the temporal evolution of fusion plasma experiments. The initial driver for the whole device model (WDM) will be prediction and avoidance of discharge-terminating disruptions, especially at high performance, which are a critical impediment to successful operation of machines like ITER. If disruptions prove unable to be avoided, their associated dynamics and effects will be addressed in the next phase of the FSP. The FSP plan targets the needed modeling capabilities by developing Integrated Science Applications (ISAs) specific to their needs. The Pedestal-Boundary model will include boundary magnetic topology, cross-field transport of multi-species plasmas, parallel plasma transport, neutral transport, atomic physics and interactions with the plasma wall

  3. Lewis' Educational and Research Collaborative Intership Program Grant Closeout Report

    Science.gov (United States)

    2003-01-01

    The Lewis' Educational and Research Collaborative Internship Program (LERCIP) is a collaborative undertaking by the Office of Educational Programs at NASA Glenn Research Center at Lewis Field (formerly NASA Lewis Research Center) and the Ohio Aerospace Institute. This program provides 10-week internships and 10 or 12-week fellowships for undergraduate/graduate students and secondary school teachers. Approximately 130 interns are selected to participate in this program each year and begin arriving the second week in May. The internships provide students with introductory professional experiences to complement their academic programs. The interns are given assignments on research and development projects under the personal guidance of NASA professional staff members. Each intern is assigned a NASA mentor who facilitates a research assignment. In addition to the research assignment, the summer program includes a strong educational component that enhances the professional stature of the participants. The educational activities include a research symposium and a variety of workshops, lectures and short courses. An important aspect of the program is that it includes students with diverse social, cultural and economic backgrounds.

  4. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  5. An Interprofessional Approach to Business Planning: A Model of Collaboration

    Science.gov (United States)

    Ross, Cory; Alexander, Kathleen; Gritsyuk, Renata; Morrin, Arleen; Tan, Jackie

    2011-01-01

    George Brown College is among the leaders in the interprofessional health-care education movement in Canada. Interprofessional Education (IPE) and Collaborative Practice occur "when students from two or more professions learn about, from and with each other to enable effective collaboration and improve health outcomes." According to the…

  6. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1987-05-01

    This document presents a plan for seismic research to be performed by the Structural and Seismic Engineering Branch in the Office of Nuclear Regulatory Research. The plan describes the regulatory needs and related research necessary to address the following issues: uncertainties in seismic hazard, earthquakes larger than the design basis, seismic vulnerabilities, shifts in building frequency, piping design, and the adequacy of current criteria and methods. In addition to presenting current and proposed research within the NRC, the plan discusses research sponsored by other domestic and foreign sources

  7. About Parallel Programming: Paradigms, Parallel Execution and Collaborative Systems

    Directory of Open Access Journals (Sweden)

    Loredana MOCEAN

    2009-01-01

    Full Text Available In the last years, there were made efforts for delineation of a stabile and unitary frame, where the problems of logical parallel processing must find solutions at least at the level of imperative languages. The results obtained by now are not at the level of the made efforts. This paper wants to be a little contribution at these efforts. We propose an overview in parallel programming, parallel execution and collaborative systems.

  8. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  9. Program collaboration and service integration activities among HIV programs in 59 U.S. health departments.

    Science.gov (United States)

    Fitz Harris, Lauren F; Toledo, Lauren; Dunbar, Erica; Aquino, Gustavo A; Nesheim, Steven R

    2014-01-01

    We identified the level and type of program collaboration and service integration (PCSI) among HIV prevention programs in 59 CDC-funded health department jurisdictions. Annual progress reports (APRs) completed by all 59 health departments funded by CDC for HIV prevention activities were reviewed for collaborative and integrated activities reported by HIV programs for calendar year 2009. We identified associations between PCSI activities and funding, AIDS diagnosis rate, and organizational integration. HIV programs collaborated with other health department programs through data-related activities, provider training, and providing funding for sexually transmitted disease (STD) activities in 24 (41%), 31 (53%), and 16 (27%) jurisdictions, respectively. Of the 59 jurisdictions, 57 (97%) reported integrated HIV and STD testing at the same venue, 39 (66%) reported integrated HIV and tuberculosis testing, and 26 (44%) reported integrated HIV and viral hepatitis testing. Forty-five (76%) jurisdictions reported providing integrated education/outreach activities for HIV and at least one other disease. Twenty-six (44%) jurisdictions reported integrated partner services among HIV and STD programs. Overall, the level of PCSI activities was not associated with HIV funding, AIDS diagnoses, or organizational integration. HIV programs in health departments collaborate primarily with STD programs. Key PCSI activities include integrated testing, integrated education/outreach, and training. Future assessments are needed to evaluate PCSI activities and to identify the level of collaboration and integration among prevention programs.

  10. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  11. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  12. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  13. Review of Collaborative Tools for Planning and Engineering

    Science.gov (United States)

    2007-10-01

    intergrating simulations and diverse collaborative activities, enhance productivity, generate products, faster, automation, integration, multiple...required. Identifiers, such as equipment model designation, trade name, military project code name, geographic location may also be included. If

  14. A Collaborative, Ongoing University Strategic Planning Framework: Process, Landmines, and Lessons

    Science.gov (United States)

    Hill, Susan E. Kogler; Thomas, Edward G.; Keller, Lawrence F.

    2009-01-01

    This article examines the strategic planning process at Cleveland State University, a large metropolitan state university in Ohio. A faculty-administrative team used a communicative planning approach to develop a collaborative, ongoing, bottom-up, transparent strategic planning process. This team then spearheaded the process through plan…

  15. A Quality Improvement Collaborative Program for Neonatal Pain Management in Japan

    Science.gov (United States)

    Yokoo, Kyoko; Funaba, Yuuki; Fukushima, Sayo; Fukuhara, Rie; Uchida, Mieko; Aiba, Satoru; Doi, Miki; Nishimura, Akira; Hayakawa, Masahiro; Nishimura, Yutaka; Oohira, Mitsuko

    2017-01-01

    Background: Neonatal pain management guidelines have been released; however, there is insufficient systematic institutional support for the adoption of evidence-based pain management in Japan. Purpose: To evaluate the impact of a collaborative quality improvement program on the implementation of pain management improvements in Japanese neonatal intensive care units (NICUs). Methods: Seven Japanese level III NICUs participated in a neonatal pain management quality improvement program based on an Institute for Healthcare Improvement collaborative model. The NICUs developed evidence-based practice points for pain management and implemented these over a 12-month period. Changes were introduced through a series of Plan-Do-Study-Act cycles, and throughout the process, pain management quality indicators were tracked as performance measures. Jonckheere's trend test and the Cochran-Armitage test for trend were used to examine the changes in quality indicator implementations over time (baseline, 3 months, 6 months, and 12 months). Findings: Baseline pain management data from the 7 sites revealed substantial opportunities for improvement of pain management, and testing changes in the NICU setting resulted in measurable improvements in pain management. During the intervention phase, all participating sites introduced new pain assessment tools, and all sites developed electronic medical record forms to capture pain score, interventions, and infant responses to interventions. Implications for Practice: The use of collaborative quality improvement techniques played a key role in improving pain management in the NICUs. Implications for Research: Collaborative improvement programs provide an attractive strategy for solving evidence-practice gaps in the NICU setting. PMID:28114148

  16. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  17. Motor carrier evaluation program plan

    International Nuclear Information System (INIS)

    Portsmouth, J.H.; Maxwell, J.E.; Boness, G.O.; Rice, L.E.

    1991-04-01

    The US Department of Energy (DOE) Transportation Management Program (TMP) has established a program to assist the DOE field offices and their contractors in evaluating the motor carriers used to transport DOE-owned hazardous and radioactive materials. This program was initiated to provide the DOE field offices with the tools necessary to help ensure, during this period of motor carrier deregulation, that only highly qualified carriers transport radioactive and hazardous commodities for the DOE. This program will assist DOE in maintaining their excellent performance record in the safe transportation of hazardous commodities. The program was also developed in response to public concern surrounding the transportation of hazardous materials. Representatives of other federal agencies, states, and tribal governments, as well as the news media, have expressed concern about the selection and qualification of carriers engaged in the transportation of Highway Route-Controlled Quantities (HRCQ) and Truckload (TL) quantities of radioactive material for the DOE. 8 refs

  18. AUA Program Master Plan. Volume 1: Overview

    Science.gov (United States)

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  19. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  20. Environmental Restoration Program Roadmap: Strategic program plan

    International Nuclear Information System (INIS)

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  1. Survey on collaborative planning in the supply chain: Deterministic and uncertain environment

    Directory of Open Access Journals (Sweden)

    Imma Ribas Vila

    2007-08-01

    Full Text Available The current globalization forces to the companies and the current technology allow them to have warehouse and distribution centers, own or subcontracted that can be dispersed geographically. The synchronization of the diverse partners involved in the Supply Chain (SC requires a Collaborative Planning with the purpose of work coordinated to be able to satisfy the demands of a more and more competitive market. In this work papers with respect to the collaborative planning in the supply chain are revised analyzing strategic aspects, like they can be the types, forms, relationships or benefits of the collaboration and tactical such aspects as the planning, material requirement and scheduling. The different models proposed to formalize the collaborative planning among the different partners in the SC are analyzed.

  2. Educating collaborative planners: the learning potential of multi-actor regional learning environments for planning education

    NARCIS (Netherlands)

    Oonk, C.; Gulikers, J.T.M.; Mulder, M.

    2013-01-01

    Recent changes in planning context, object, subject and approaches characterised by the key words wickedness, collaborative processes and boundary crossing, require a reconsideration of competencies needed for professional planners and evidence for the effectiveness of learning environments in which

  3. Federally Funded Programs Related to Building Energy Use: Overlaps, Challenges, and Opportunities for Collaboration

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Butner, Ryan S.; Hostick, Donna J.

    2010-10-01

    As energy efficiency in buildings continues to move from discreet technology development to an integrated systems approach, the need to understand and integrate complementary goals and targets becomes more pronounced. Whether within Department of Energy’s (DOE) Building Technologies Program (BTP), across the Office of Energy Efficiency and Renewable Energy (EERE), or throughout DOE and the Federal government, mutual gains and collaboration synergies exist that are not easily achieved because of organizational and time constraints. There also cases where federal agencies may be addressing similar issues, but with different (and sometimes conflicting) outcomes in mind. This report conducts a comprehensive inventory across all EERE and other relevant Federal agencies of potential activities with synergistic benefits. A taxonomy of activities with potential interdependencies is presented. The report identifies a number of federal program objectives, products, and plans related to building energy efficiency and characterizes the current structure and interactions related to these plans and programs. Areas where overlap occurs are identified as are the challenges of addressing issues related to overlapping goals and programs. Based on the input gathered from various sources, including 20 separate interviews with federal agency staff and contractor staff supporting buildings programs, this study identifies a number of synergistic opportunities and makes recommends a number of areas where further collaboration could be beneficial.

  4. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  5. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  6. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  7. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  8. Preretirement Programs within Service Firms: Existing and Planned Programs.

    Science.gov (United States)

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  9. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  10. Program plan: DWPF/HLWDP stirred Melter Program Plan

    International Nuclear Information System (INIS)

    Smith, M.E.

    1994-01-01

    Slurry Fed Melters (SFM) have been developed in the United States, Europe, and Japan for the conversion of high-level radioactive waste (HLW) to borosilicate glass for permanent disposal. The newest design, the stirred melter, combines the high production rates and high glass quality features of the Joule-heated melters with the low-cost, compact, simple maintenance features of the pot melters. However, further engineering design and demonstrations are needed to operate the stirred melter on a large scale. This document outlines the program which develops a full scale stirred melter for the DWPF (240 pph), and provides a basis which will allow further scale-up of the technology for use in the Hanford High Level Waste Disposal Program (HLWDP) for up to four times the reference capacity

  11. TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001

    Energy Technology Data Exchange (ETDEWEB)

    SCHWARTZ,S.E.; LUNN,P.

    2001-03-01

    The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

  12. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  13. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  14. Strategic planning in an academic radiation medicine program

    Science.gov (United States)

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  15. Strategic planning in an academic radiation medicine program.

    Science.gov (United States)

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  16. Conceptual design report for the scientific program of the super-FRS experiment collaboration

    International Nuclear Information System (INIS)

    2016-01-01

    This Conceptual Design Report (CDR) presents the plans of the Super-FRS Experiment Collaboration for a variety of experiments, which build on the versatile high-resolution separator and spectrometer performance of the Super-FRS. The characteristic feature of these experiments is the fact that they use the separator as an integral part of the measurement. These experiments build on the experience of the collaboration and their scientific program pursued at the FRS in the last 25 years, but also includes recently developed novel topics. Under these premises, the Super-FRS Experiment Collaboration has identified ten major topics of current interest and with far-reaching scientific potential. In this CDR, the scientific case is briefly recapitulated and the conceptual design of the experiments, the setups and their implementation are described. Much of the needed equipment is already available or, if not, will be realized with new, additional resources and efforts outside the FAIR Cost Books. The related R and D works and some pilot experiments can be carried out at the existing FRS of GSI in FAIR Phase-0. On the midterm, the science program of this collaboration can start at the commissioning phase of the Super-FRS and will continue on the long term with the established full performance. Accordingly, the prototype equipment and other already existing devices can be tested and used at the FRS and can later, when completed or upgraded, be moved to the Super-FRS. The related developments and organization of the Super-FRS Experiment Collaboration are described,and the collaboration partners and institutes are listed. The Super-FRS Experiment Collaboration is formally and firmly established and is a comprising part of the NUSTAR Collaboration. A large variety of modern nuclear physics experiments with new scientific possibilities and outstanding scientific potential were presented in the scientific program (GSI-Report 2014-4), which was very positively evaluated and

  17. Conceptual design report for the scientific program of the super-FRS experiment collaboration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-11-01

    This Conceptual Design Report (CDR) presents the plans of the Super-FRS Experiment Collaboration for a variety of experiments, which build on the versatile high-resolution separator and spectrometer performance of the Super-FRS. The characteristic feature of these experiments is the fact that they use the separator as an integral part of the measurement. These experiments build on the experience of the collaboration and their scientific program pursued at the FRS in the last 25 years, but also includes recently developed novel topics. Under these premises, the Super-FRS Experiment Collaboration has identified ten major topics of current interest and with far-reaching scientific potential. In this CDR, the scientific case is briefly recapitulated and the conceptual design of the experiments, the setups and their implementation are described. Much of the needed equipment is already available or, if not, will be realized with new, additional resources and efforts outside the FAIR Cost Books. The related R and D works and some pilot experiments can be carried out at the existing FRS of GSI in FAIR Phase-0. On the midterm, the science program of this collaboration can start at the commissioning phase of the Super-FRS and will continue on the long term with the established full performance. Accordingly, the prototype equipment and other already existing devices can be tested and used at the FRS and can later, when completed or upgraded, be moved to the Super-FRS. The related developments and organization of the Super-FRS Experiment Collaboration are described,and the collaboration partners and institutes are listed. The Super-FRS Experiment Collaboration is formally and firmly established and is a comprising part of the NUSTAR Collaboration. A large variety of modern nuclear physics experiments with new scientific possibilities and outstanding scientific potential were presented in the scientific program (GSI-Report 2014-4), which was very positively evaluated and

  18. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  19. Collaborative Business Planning in Initial Vocational Education and Training

    Science.gov (United States)

    Laine, Kati; Hämäläinen, Raija

    2015-01-01

    There is a growing demand to enhance entrepreneurship. This study aims at producing knowledge that can assist teachers in designing and supporting collaborative learning of entrepreneurship in vocational education. A qualitative case study approach was adopted. The outcome of this study provides a better understanding of the factors that hinder…

  20. Building 4-H Program Capacity and Sustainability through Collaborative Fee-Based Programs

    Science.gov (United States)

    Pellien, Tamara

    2016-01-01

    Shrinking budgets and increased demands for services and programs are the norm for today's Extension professional. The tasks of procuring grants, developing fund raisers, and pursuing donors require a large investment of time and can lead to mission drift in the pursuit of funding. Implementing a collaborative fee-based program initiative can fund…

  1. Materials Characterization Center program plan

    International Nuclear Information System (INIS)

    Nelson, R.D.; Ross, W.A.; Hill, O.F.; Mendel, J.E.; Merz, M.D.; Turcotte, R.P.

    1980-03-01

    The Materials Characterization Center (MCC) has been established at Pacific Northwest Laboratory as part of the Materials Characterization Organization for providing an authoritative, referenceable basis for establishing nuclear waste material properties and test methods. The MCC will provide a data base that will include information on the components of the waste emplacement package - the spent fuel or processed waste form and the engineered barriers - and their interaction with each other and as affected by the environment. The MCC will plan materials testing, develop and document procedures, collect and analyze existing materials data, and conduct tests as necessary

  2. Atmospheric Radiation Measurement Program plan

    International Nuclear Information System (INIS)

    1990-02-01

    In order to understand energy's role in anthropogenic global climate change, significant reliance is being placed on General Circulation Models (GCMs). A major goal is to foster the development of GCMs capable of predicting the timing and magnitude of greenhouse gas-induced global warming and the regional effects of such warming. The Atmospheric Radiation Measurement (ARM) Program will contribute to the Department of Energy goal by improving the treatment of cloud radiative forcing and feedbacks in GCMs. Two issues will be addressed: the radiation budget and its spectral dependence and the radiative and other properties of clouds. The experimental objective of the ARM Program is to characterize empirically the radiative processes in the Earth's atmosphere with improved resolution and accuracy. A key to this characterization is the effective treatment of cloud formation and cloud properties in GCMs. Through this characterization of radiative properties, it will be possible to understand both the forcing and feedback effects. 19 refs., 4 figs., 2 tabs

  3. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  4. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  5. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  6. MHD Program Plan, FY 1992

    International Nuclear Information System (INIS)

    1991-10-01

    The current MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. Essential elements of the current program include: (1) develop technical and environmental data for the integrated MHD topping cycle system through POC testing (1,000 hours); (2) develop technical and environmental data for the integrated MHD bottoming cycle sub system through POC testing (4,000 hours); (3) design, construct, and operate a seed regeneration POC facility (SRPF) capable of processing spent seed materials from the MHD bottoming cycle; (4) prepare conceptual designs for a site specific MHD retrofit plant; and (5) continue system studies and supporting research necessary for system testing. The current MHD program continues to be directed toward coal fired power plant applications, both stand-alone and retrofit. Development of a plant should enhance the attractiveness of MHD for applications other than electrical power. MHD may find application in electrical energy intensive industries and in the defense sector

  7. Institutional Framework for Collaborative Urban Planning in Afghanistan in view of the Transferring Process of International Urban Planning Systems

    Directory of Open Access Journals (Sweden)

    Habib Ahmad Javid

    2015-09-01

    Full Text Available This article provides an overview of Afghanistan’s urban planning institutional change in certain historical periods, particular dilemmas within the current urban planning system and its gradual shift from totalitarian urban planning approaches practiced during 1960s - 1980s to a different form of planning being practiced by the current government. In addition, it will seek to analyze the ease and tension caused by the three recent phenomena that have emerged after the establishment of a new democratic government in Afghanistan since 2001, such as private sector-led urban development, international funding community’s and NGOs’ role in planning and the delegation of certain roles given to different tires of the government. Another purpose of this work is to analyze the collaboration among urban planning institutions, private sector, international funding community, NGOs and civil society within the current urban planning arena of Afghanistan and to identify the roles, responsibilities and functions of urban planning institutions in different levels of urban governance. Finally find out what possible and necessary institutional changes and framework are needed in order to foster grassroots based inter-institutional collaboration and partnership among various tires of government. The methodological approach to the research is based on qualitative data analysis. For the analysis purpose, government urban planning data and in-depth, semi-structured, face-to-face interviews with Afghanistan’s urban planning officials were thematically used, which provided in-depth information about involved actors in urban planning and their roles and relationships.

  8. Collaboration

    Science.gov (United States)

    King, Michelle L.

    2010-01-01

    This article explores collaboration between library media educators and regular classroom teachers. The article focuses on the context of the issue, positions on the issue, the impact of collaboration, and how to implement effective collaboration into the school system. Various books and professional journals are used to support conclusions…

  9. Distributed Cognition and Embodiment in Text Planning: A Situated Study of Collaborative Writing in the Workplace

    Science.gov (United States)

    Clayson, Ashley

    2018-01-01

    Through a study of collaborative writing at a student advocacy nonprofit, this article explores how writers distribute their text planning across tools, artifacts, and gestures, with a particular focus on how embodied representations of texts are present in text planning. Findings indicate that these and other representations generated by the…

  10. Closing the Communication Gap: "Web 2.0 Tools for Enhanced Planning and Collaboration"

    Science.gov (United States)

    Charles, Kelly J.; Dickens, Virginia

    2012-01-01

    Web 2.0 is expanding the way general and special educators collaborate, especially in co-teaching situations. This article draws attention to several free web-based tools and a co-teaching lesson plan supplement that can be used to incorporate Web 2.0 technologies during the co-planning, co-teaching and shared reflection processes between the…

  11. Atmospheric Radiation Measurement Program Plan

    International Nuclear Information System (INIS)

    1990-02-01

    In order to understand energy's role in anthropogenic global climate change, significant reliance is being placed on General Circulation Models (GCMs). A major goal of the Department is to foster the development of GCMs capable of predicting the timing and magnitude of greenhouse gas-induced global warming and the regional effects of such warming. DOE research has revealed that cloud radiative feedback is the single most important effect determining the magnitude of possible climate responses to human activity. However, cloud radiative forcing and feedbacks are not understood at the levels needed for reliable climate prediction. The Atmospheric Radiation Measurement (ARM) Program will contribute to the DOE goal by improving the treatment of cloud radiative forcing and feedbacks in GCMs. Two issues will be addressed: the radiation budget and its spectral dependence and the radiative and other properties of clouds. Understanding cloud properties and how to predict them is critical because cloud properties may very well change as climate changes. The experimental objective of the ARM Program is to characterize empirically the radiative processes in the Earth's atmosphere with improved resolution and accuracy. A key to this characterization is the effective treatment of cloud formation and cloud properties in GCMs. Through this characterization of radiative properties, it will be possible to understand both the forcing and feedback effects. GCM modelers will then be able to better identify the best approaches to improved parameterizations of radiative transfer effects. This is expected to greatly improve the accuracy of long-term, GCM predictions and the efficacy of those predictions at the important regional scale, as the research community and DOE attempt to understand the effects of greenhouse gas emissions on the Earth's climate. 153 refs., 24 figs., 6 tabs

  12. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  13. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  14. NASA program planning on nuclear electric propulsion

    International Nuclear Information System (INIS)

    Bennett, G.L.; Miller, T.J.

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs

  15. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  16. Collaboration for cooperative work experience programs in biomedical engineering education.

    Science.gov (United States)

    Krishnan, Shankar

    2010-01-01

    Incorporating cooperative education modules as a segment of the undergraduate educational program is aimed to assist students in gaining real-life experience in the field of their choice. The cooperative work modules facilitate the students in exploring different realistic aspects of work processes in the field. The track records for cooperative learning modules are very positive. However, it is indeed a challenge for the faculty developing Biomedical Engineering (BME) curriculum to include cooperative work experience or internship requirements coupled with a heavy course load through the entire program. The objective of the present work is to develop a scheme for collaborative co-op work experience for the undergraduate training in the fast-growing BME programs. A few co-op/internship models are developed for the students pursuing undergraduate BME degree. The salient features of one co-op model are described. The results obtained support the proposed scheme. In conclusion, the cooperative work experience will be an invaluable segment in biomedical engineering education and an appropriate model has to be selected to blend with the overall training program.

  17. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  18. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  19. Transfer from planned home birth to hospital: improving interprofessional collaboration.

    Science.gov (United States)

    Vedam, Saraswathi; Leeman, Lawrence; Cheyney, Melissa; Fisher, Timothy J; Myers, Susan; Low, Lisa Kane; Ruhl, Catherine

    2014-01-01

    Women's heightened interest in choice of birthplace and increased rates of planned home birth in the United States have been well documented, yet there remains significant public and professional debate about the ethics of planned home birth in jurisdictions where care is not clearly integrated across birth settings. Simultaneously, the quality of interprofessional interactions is recognized as a predictor of health outcomes during obstetric events. When care is transferred across birth settings, confusion and conflict among providers with respect to roles and responsibilities can adversely affect both outcomes and the experience of care for women and newborns. This article reviews findings of recent North American studies that examine provider attitudes toward planned home birth, differing concepts of safety of birthplace as reported by women and providers, and sources of conflict among maternity care providers during transfer from home to hospital. Emerging evidence and clinical exemplars can inform the development of systems for seamless transfer of women and newborns from planned home births to hospital and improve experience and perceptions of safety among families and providers. Three successful models in the United States that have enhanced multidisciplinary cooperation and coordination of care across birth settings are described. Finally, best practice guidelines for roles, communication, and mutual accommodation among all participating providers when transfer occurs are introduced. Research, health professional education, and policy recommendations for incorporation of key components into existing health care systems in the United States are included. © 2014 by the American College of Nurse-Midwives.

  20. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Science.gov (United States)

    2011-02-09

    ... Plan Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Program implementation with request for comments. SUMMARY: SBA is introducing a new Dealer Floor Plan Pilot Program to make... Plan Pilot Program was created in the Small Business Jobs Act of 2010. Under the new Dealer Floor Plan...

  1. Interprofessional collaboration regarding patients' care plans in primary care: a focus group study into influential factors.

    Science.gov (United States)

    van Dongen, Jerôme Jean Jacques; Lenzen, Stephanie Anna; van Bokhoven, Marloes Amantia; Daniëls, Ramon; van der Weijden, Trudy; Beurskens, Anna

    2016-05-28

    The number of people with multiple chronic conditions demanding primary care services is increasing. To deal with the complex health care demands of these people, professionals from different disciplines collaborate. This study aims to explore influential factors regarding interprofessional collaboration related to care plan development in primary care. A qualitative study, including four semi-structured focus group interviews (n = 4). In total, a heterogeneous group of experts (n = 16) and health care professionals (n = 15) participated. Participants discussed viewpoints, barriers, and facilitators regarding interprofessional collaboration related to care plan development. The data were analysed by means of inductive content analysis. The findings show a variety of factors influencing the interprofessional collaboration in developing a care plan. Factors can be divided into 5 key categories: (1) patient-related factors: active role, self-management, goals and wishes, membership of the team; (2) professional-related factors: individual competences, domain thinking, motivation; (3) interpersonal factors: language differences, knowing each other, trust and respect, and motivation; (4) organisational factors: structure, composition, time, shared vision, leadership and administrative support; and (5) external factors: education, culture, hierarchy, domain thinking, law and regulations, finance, technology and ICT. Improving interprofessional collaboration regarding care plan development calls for an integral approach including patient- and professional related factors, interpersonal, organisational, and external factors. Further, the leader of the team seems to play a key role in watching the patient perspective, organising and coordinating interprofessional collaborations, and guiding the team through developments. The results of this study can be used as input for developing tools and interventions targeted at executing and improving interprofessional

  2. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  3. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  4. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  5. Natural and accelerated bioremediation research program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  6. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Link, H.; Keller, J.; Guo, Y.; McNiff, B.

    2013-04-01

    Gearboxes in wind turbines have not been achieving their expected design life even though they commonly meet or exceed the design criteria specified in current design standards. One of the basic premises of the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is that the low gearbox reliability results from the absence of critical elements in the design process or insufficient design tools. Key goals of the GRC are to improve design approaches and analysis tools and to recommend practices and test methods resulting in improved design standards for wind turbine gearboxes that lower the cost of energy (COE) through improved reliability. The GRC uses a combined gearbox testing, modeling and analysis approach, along with a database of information from gearbox failures collected from overhauls and investigation of gearbox condition monitoring techniques to improve wind turbine operations and maintenance practices. Testing of Gearbox 2 (GB2) using the two-speed turbine controller that has been used in prior testing. This test series will investigate non-torque loads, high-speed shaft misalignment, and reproduction of field conditions in the dynamometer. This test series will also include vibration testing using an eddy-current brake on the gearbox's high speed shaft.

  7. Enhancing Michigan's local public health accreditation program through participation in the multistate learning collaborative.

    Science.gov (United States)

    Kushion, Mary L; Tews, Debra Scamarcia; Parker, Melody D

    2007-01-01

    This article presents Michigan's efforts and accomplishments as a result of its involvement with the Multi-State Learning Collaborative (MLC) project. The article gives a brief overview of Michigan's accreditation program. It outlines the two goals and six objectives associated with Michigan's MLC project, and describes the structure it used to implement the project plan. It further explains and illustrates the outcomes achieved from successfully meeting the goals and objectives. The article gives a sample of a proposed voluntary component for continuous quality improvement that local health departments can implement utilizing the Shewhart Cycle of "Plan, Do, Check, and Act" and National Association of City and County Health Officials' Operational Definition of a Functional Health Department.

  8. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  9. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  10. Update on the development and evaluation of a program of regional collaboration for non-proliferation and transparency

    International Nuclear Information System (INIS)

    Furaus, James P.; Hori, Masato; Glidewell, Don

    2003-01-01

    The purpose of the research is to develop and evaluate a Program of Regional Cooperation for Non-proliferation and transparency in the Pacific Rim arena. There has been interest in the development of regional collaboration in the Pacific Rim for over thirty years, but without the kind of results that have been observed in other areas of the world, such as Europe and South America. While there have been many discussions and many papers written on the topic, there has not been a concept or a program that has been proposed and successfully implemented. This research will identify attributes of existing successful regional collaborations in other parts of the world, research the open literature for past ideas and attempts for regional collaboration in the Pacific Rim, and propose a model for a sustainable regional collaboration in the Pacific Rim. One of the strategies for developing the program of collaboration is to create a Joint Program Plan for the Implementation of Technology Based Regional Cooperation. This plan will be developed jointly by Japan Nuclear Cycle Development Institute (JNC) and Sandia National Laboratories (SNL), with input from the US Department of Energy/National Nuclear Security Administration/National Nuclear Security Administration (USDOE/NNSA), the International Atomic Energy Agency (IAEA) and other interested organizations. The plan will be a 'living plan,' that will be reviewed on a yearly basis to review status, and update as necessary. Another strategy is to implement technical objectives in parallel with the development of the program plan. This would include the completion of the implementation of a Virtual Private Network (VPN) system at JNC and sharing transparency data with SNL, USDOE/NNSA, IAEA, and other interested Pacific Rim entities. The availability of commercial off-the-shelf VPN systems, a technology that allows secure, inexpensive transfer of data across the Internet, will potentially be a key ingredient in the development

  11. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    Science.gov (United States)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-03-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  12. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    Science.gov (United States)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-04-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  13. A Collaborative Approach to Planning the Induction Process for Beginning Vocational Teachers.

    Science.gov (United States)

    Camp, William G.; Heath, Betty

    An effective induction assistance program is necessary to prepare beginning vocational education teachers. A structured approach should be based on research, educational theory, experience, and the best thinking that can be found. To be successful, an induction assistance program must be a collaborative effort, accepted and supported by local…

  14. Middle East physics collaboration plans for the future

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    The SESAME initiative, the Synchrotron-light for Experimental Science and Applications in the Middle East, is making progress. At a recent SESAME Council meeting at the end of May, Jordan, Iran and Israel confirmed their cash contributions to the project’s storage ring. The Palestinian Authority and Pakistan have confirmed their in-kind support and Egypt and Turkey are taking steps to allow their participation. Technically planned to start operation in 2015, SESAME has begun to show significant potential as a science for peace initiative in the Middle East.   The SESAME site in Allaan, Jordan.                   (© SESAME) Jordan has provided the land and an elegant building that will house the accelerator complex and associated infrastructure; a number of states, organizations and synchrotron light laboratories have donated the injector and booster, beam lines or components, support for infras...

  15. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  16. Status and Update of the RaDIATE Collaboration R&D Program

    Energy Technology Data Exchange (ETDEWEB)

    Ammigan, K. [Fermilab; Hurh, P. [Fermilab

    2017-07-01

    The Radiation Damage In Accelerator Target Environments (RaDIATE) collaboration was founded in 2012 and currently consists of over 50 participants and 11 institutions globally. Due to the increasing power of future proton accelerator sources in target facilities, there is a critical need to further understand the physical and thermo-mechanical radiation response of target facility materials. Thus, the primary objective of the RaDIATE collaboration is to draw on existing expertise in the nuclear materials and accelerator targets fields to generate new and useful materials data for application within the accelerator and fission/fusion communities. Current research activities of the collaboration include post irradiation examination (PIE) of decommissioned components from existing beamlines such as the NuMI beryllium beam window and graphite NT-02 target material. PIE of these components includes advanced microstructural analyses (SEM/TEM, EBSD, EDS) and micro-mechanics technique such as nano-indentation, to help characterize any microstructural radiation damage incurred during operation. New irradiation campaigns of various candidate materials at both low and high energy beam facilities are also being pursued. Beryllium helium implantation studies at the University of Surrey as well as high energy proton irradiation of various materials at Brookhaven National Laboratory’s BLIP facility have been initiated. The program also extends to beam-induced thermal shock experiments using high intensity beam pulses at CERN’s HiRadMat facility, followed by advanced PIE activities to evaluate thermal shock resistance of the materials. Preliminary results from ongoing research activities, as well as the future plans of the RaDIATE collaboration R&D program will be discussed.

  17. Exploring Collaborative and Community Based Planning in Tourism Case Study Sitia-Cavo Sidero Project

    OpenAIRE

    Katsouli, Penelope

    2007-01-01

    The present paper has explored the policy planning and development in emerging tourism settings in Sitia. Comprehensively, this study, in the name of sustainable development, focused on the extent of collaborative and community-based planning. For that reason exploratory research has been used; the context and the structure of this paper aimed to uncover the socially constructed reality of Sitia's stakeholders, within the dynamic environment, and respond to and questions. Therein significant ...

  18. Expanding a community's justice response to sex crimes through advocacy, prosecutorial, and public health collaboration: introducing the RESTORE program.

    Science.gov (United States)

    Koss, Mary P; Bachar, Karen J; Hopkins, C Quince; Carlson, Carolyn

    2004-12-01

    Problems in criminal justice system response to date-acquaintance rape and nonpenetration sexual offenses include (a) they are markers of a sexual offending career, yet are viewed as minor; (b) perpetrators are not held accountable in ways that reduce reoffense; and (c) criminal justice response disappoints and traumatizes victims. To address these problems, a collaboration of victim services, prosecutors, legal scholars, and public health professionals are implementing and evaluating RESTORE, a victim-driven, community-based restorative justice program for selected sex crimes. RESTORE prepares survivors, responsible persons (offenders), and both parties' families and friends for face-to-face dialogue to identify the harm and develop a redress plan. The program then monitors the offender's compliance for 12 months. The article summarizes empirical data on problems in criminal justice response, defines restorative justice models, and examines outcome. Then the RESTORE program processes and goals are described. The article highlights community collaboration in building and sustaining this program.

  19. Developing a Collaborative Planning Framework for Sustainable Transportation

    Directory of Open Access Journals (Sweden)

    Okan Örsan Özener

    2014-01-01

    Full Text Available Currently, as being the highest petroleum consuming sector in the world, transportation significantly contributes to the total greenhouse gas emissions in the world. Road transportation not only is responsible for approximately 20% of the total emissions of carbon dioxide in the EU and in the US but also has a steadily increasing trend in contributing to global warming. Initiatives undertaken by authorities, such as Emission cap and trade in the EU, limit the emissions resulted from the actions of the companies and also give economic incentives to companies to reduce their emissions. However, in logistics systems with multiple entities, it is difficult to assess the responsibilities of the companies both in terms of costs and emissions. In this study, we consider a delivery network with multiple customers served by a single carrier, which executes a delivery plan with the minimum transportation cost, and allocate the resulting costs and the emissions among the customers in a fair manner. We develop allocation mechanisms for both costs and emissions. In order to develop a mechanism that provides further reduction of the emissions, we study a setting where the carrier takes the responsibility of the emissions and reflects the resulting inefficiencies while charging the customers.

  20. Delineating Partnerships from other Forms of Collaboration in Regional Development Planning

    DEFF Research Database (Denmark)

    Larsen, Peter Wilgaard

    2017-01-01

    The idea of an all-encompassing partnership has vindicated all sorts of collaboration models to be articulated as partnerships although not occurring as ones, leaving practitioners and politicians of regional development planning with suboptimal ways of collaborating. Reviewing the partnership...... of regional planning and development, this paper defines a partnership to be a promise of a promise denoting other collaborative models such as network, cluster and governance-partnership as a promise only. Based on qualitative interviews, discursive analyses and strategic documents, the comparative case...... analysis of two Danish regional development agencies shows how one remained as a governance-partnership while the other turned into a partnership by continuously creating possibilities for the groups of actors involved. This transformation from a promise only into a promise of a promise displays how...

  1. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  2. Research on radionuclide migration under subsurface geochemical conditions. JAERI/AECL Phase II Collaborative Program Year 1 (joint research)

    International Nuclear Information System (INIS)

    1998-11-01

    A radionuclide migration experiment program for fractured rocks was performed under the JAERI/AECL Phase-II Collaborative Program on research and development in radioactive waste management. The program started in the fiscal year 1993, as a five-year program consists of Quarried block radionuclide migration program, Speciation of long-lived radionuclides in groundwater, Isotopic hydrogeology and Groundwater flow model development. During the first year of the program (Program Year 1: March 18, 1994 - September 30, 1994), a plan was developed to take out granite blocks containing part of natural water-bearing fracture from the wall of the experimental gallery at the depth of 240 m, and literature reviews were done in the area of the speciation of long-lived radionuclides in groundwater, isotopic hydrogeology and the groundwater flow model development to proceed further work for the Program Year 2. (author)

  3. Surplus Highly Enriched Uranium Disposition Program plan

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements

  4. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  5. Improving Collaborative Planning and Reflection Practices at International Baccalaureate Diploma Schools in Amman

    Science.gov (United States)

    Saa'd AlDin, Kawther

    2014-01-01

    In 2010, the International Baccalaureate (IB) Organization mandated that all its schools, including Diploma (DP) schools, adhere to the collaborative planning and reflection requirements, which emphasized the importance of integrating its theory of knowledge (TOK) core component into all disciplines. Many schools officials and educations in Amman…

  6. Leveraging Literacies through Collaborative, Source-Based Planning and Teaching in Social Studies and Language Arts

    Science.gov (United States)

    Patterson, Nancy; Weaver, Joanna; Fletcher, Jamie; Connor, Bryce; Thomas, Angela; Ross, Cindy

    2018-01-01

    The value of preparing students for college, careers, and civic life is a shared outcome of social studies and language arts teachers. This study explores how developing content and civic literacy to these ends can be fortified through language arts and social studies teacher collaboration in source-based planning and teaching. Although numerous…

  7. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, Richard B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colwell, Jeffery A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  8. The attitudinal and cognitive effects of interdisciplinary collaboration on elementary pre-service teachers development of biological science related lesson plans

    Science.gov (United States)

    Mills, Jada Jamerson

    There is a need for STEM (science, technology, engineering, and mathematics) education to be taught effectively in elementary schools. In order to achieve this, teacher preparation programs should graduate confident, content strong teachers to convey knowledge to elementary students. This study used interdisciplinary collaboration between the School of Education and the College of Liberal Arts through a Learning-by-Teaching method (LdL): Lernen durch Lernen in German. Pre-service teacher (PST) achievement levels of understanding science concepts based on pretest and posttest data, quality of lesson plans developed, and enjoyment of the class based on the collaboration with science students. The PSTs enrolled in two treatment sections of EDEL 404: Science in the Elementary Classroom collaborated with science students enrolled in BISC 327: Introductory Neuroscience to enhance their science skills and create case-based lesson plans on neurothology topics: echolocation, electrosensory reception, steroid hormones, and vocal learning. The PSTs enrolled in the single control section of EDEL 404 collaborated with fellow elementary education majors to develop lesson plans also based on the same selected topics. Qualitative interviews of education faculty, science faculty, and PSTs provided depth to the quantitative findings. Upon lesson plan completion, in-service teachers also graded the two best and two worst plans for the treatment and control sections and a science reviewer graded the plans for scientific accuracy. Statistical analyses were conducted for hypotheses, and one significant hypothesis found that PSTs who collaborated with science students had more positive science lesson plan writing attitudes than those who did not. Despite overall insignificant statistical analyses, all PSTs responded as more confident after collaboration. Additionally, interviews provided meaning and understanding to the insignificant statistical results as well as scientific accuracy of

  9. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  10. 75 FR 17412 - Cancer Therapy Evaluation Program Intellectual Property Option to Collaborator

    Science.gov (United States)

    2010-04-06

    ... Program Intellectual Property Option to Collaborator AGENCY: National Cancer Institute (NCI), National... Evaluation Program (CTEP) INTELLECTUAL PROPERTY OPTION. The proposed policy, if finalized, would establish... recommended Intellectual Property Option and Institution Notification if they wish to be considered for...

  11. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  12. Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

    Science.gov (United States)

    Rodionova, Olga; Arneson, Heather; Sridhar, Banavar; Evans, Antony

    2017-01-01

    The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

  13. Collaborative Learning Processes in the Context of a Public Health Professional Development Program: A Case Study

    Science.gov (United States)

    Tremblay, Marie-Claude; Richard, Lucie; Brousselle, Astrid; Chiocchio, François; Beaudet, Nicole

    2017-01-01

    The health promotion laboratory (HPL-Canada) is a public health professional development program building on a collaborative learning approach in order to support long-term practice change in local health services teams. This study aims to analyse the collaborative learning processes of two teams involved in the program during the first year of…

  14. The Impact of an Online Collaborative Learning Program on Students' Attitude towards Technology

    Science.gov (United States)

    Magen-Nagar, Noga; Shonfeld, Miri

    2018-01-01

    This quantitative research examined the contribution of an Online Collaborative Learning (OCL) program on attitudes towards technology in terms of technological anxiety, self-confidence and technology orientation among M.Ed. students. The advanced online collaborative program was implemented at two teacher training colleges in Israel for a period…

  15. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  16. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  17. Draft reclamation program plan for site characterization

    International Nuclear Information System (INIS)

    1989-08-01

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation's first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs

  18. A Web-based Tool for Transparent, Collaborative Urban Water System Planning for Monterrey, Mexico

    Science.gov (United States)

    Rheinheimer, D. E.; Medellin-Azuara, J.; Garza Díaz, L. E.; Ramírez, A. I.

    2017-12-01

    Recent rapid advances in web technologies and cloud computing show great promise for facilitating collaboration and transparency in water planning efforts. Water resources planning is increasingly in the context of a rapidly urbanizing world, particularly in developing countries. In such countries with democratic traditions, the degree of transparency and collaboration in water planning can mean the difference between success and failure of water planning efforts. This is exemplified in the city of Monterrey, Mexico, where an effort to build a new long-distance aqueduct to increase water supply to the city dramatically failed due to lack of transparency and top-down planning. To help address, we used a new, web-based water system modeling platform, called OpenAgua, to develop a prototype decision support system for water planning in Monterrey. OpenAgua is designed to promote transparency and collaboration, as well as provide strong, cloud-based, water system modeling capabilities. We developed and assessed five water management options intended to increase water supply yield and/or reliability, a dominant water management concern in Latin America generally: 1) a new long-distance source (the previously-rejected project), 2) a new nearby reservoir, 3) expansion/re-operation of an existing major canal, 4) desalination, and 5) industrial water reuse. Using the integrated modeling and analytic capabilities of OpenAgua, and some customization, we assessed the performance of these options for water supply yield and reliability to help identify the most promising ones. In presenting this assessment, we demonstrate the viability of using online, cloud-based modeling systems for improving transparency and collaboration in decision making, reducing the gap between citizens, policy makers and water managers, and future directions.

  19. Looking Back to Move Forward: Collaborative Planning to Revise the Green Mountain and Finger Lakes National Forests Land and Resource Management Plans

    Directory of Open Access Journals (Sweden)

    Michael J Dockry

    2015-07-01

    Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.

  20. Examining Strategies to Build and Sustain Healthy Aging Programming Collaboratives

    Science.gov (United States)

    Altpeter, Mary; Schneider, Ellen Caylor; Whitelaw, Nancy

    2014-01-01

    Background: Community collaboratives provide a means to build local capacity, reduce service fragmentation and duplication, maximize efficiency, and create synergies for "systems change". But what are the collaborative practices that aging services providers and other stakeholders employ for "system change" and…

  1. Lessons in collaboration and effective field research from the Appalachian Headwaters Research Experience for Undergraduates Program

    Science.gov (United States)

    Jones, A. L.; Fox, J.; Wilder, M. S.

    2009-12-01

    In the summer of 2009, the authors launched year one of a three-year National Science Foundation-funded Research Experience for Undergraduates entitled "Carbon Storage and Headwater Health in the Appalachian Headwaters." Eight undergraduates selected from a nationally competitive field of more than 60 applicants participated in the ten-week field- and laboratory-based program along with three middle- and high-school teachers. Each student developed and completed an independent research project related to coal mining’s impact on soil organic carbon and sediment transport processes. Specifically, they used isotope ratio mass spectrometry to measure the carbon and nitrogen stable isotopic signature of soils and sediments in the Appalachian headwater landscapes and first order streams of Kentucky's southeastern coalfields. Among the program's innovative features was its fundamentally collaborative nature--which was represented in several ways. First, the background of the three program leaders was very different: an environmental planner with an academic background in land use planning and administration (Jones); a civil engineer trained in biogeochemistry and watershed modeling (Fox); and an environmental educator experienced in both formal and nonformal educator training and certification (Wilder). The program was also a collaboration between a Carnegie 1 research-oriented institution and an undergraduate/ teaching -focused regional comprehensive university. Finally, the participants themselves represented a diversity of disciplines and institutional backgrounds--including biology, geology, chemistry, environmental science and civil engineering. The Research Experience for Teachers component was another innovative program element. The teachers participated in all field and laboratory research activities during the first six weeks, then developed a unit of study for their own classrooms to be implemented during the current school year. In addition to the six

  2. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  3. Federal Employees Health Benefits Program (FEHBP) Plan Information

    Data.gov (United States)

    Office of Personnel Management — A list of all Federal Employees Health Benefits Program (FEHBP) plans available in each state, as well as links to the plan brochures, changes for each plan from the...

  4. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  5. Salt Repository Project transportation program plan

    International Nuclear Information System (INIS)

    Fisher, R.L.; Greenberg, A.H.; Anderson, T.L.; Yates, K.R.

    1987-01-01

    The Salt Repository Project (SRP) has the responsibility to develop a comprehensive transportation program plan (TrPP) that treats the transportation of workers, supplies, and high-level radioactive waste to the site and the transportation of salt, low-level, and transuranic wastes from the site. The TrPP has developed a systematic approach to transportation which is directed towards satisfying statutes, regulations, and directives and is guided by a hierarchy of specific functional requirements, strategies, plans, and reports. The TrPP identifies and develops the planning process for transportation-related studies and provides guidance to staff in performing and documenting these activities. The TrPP also includes an explanation of the responsibilities of the organizational elements involved in these transportation studies. Several of the report chapters relate to identifying routes for transporting nuclear waste to the site. These include a chapter on identifying an access corridor for a new rail route leading to the site, identifying and evaluating emergency-response preparedness capabilities along candidate routes in the state, and identifying alternative routes from the state border, ports, or in-state reactors to the site. The TrPP also includes plans for identifying salt disposal routes and a discussion of repository/transportation interface requirements. 89 refs., 6 figs

  6. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  7. Ebola Preparedness Planning and Collaboration by Two Health Systems in Wisconsin, September to December 2014.

    Science.gov (United States)

    Leonhardt, Kathryn Kraft; Keuler, Megan; Safdar, Nasia; Hunter, Paul

    2016-08-01

    We describe the collaborative approach used by 2 health systems in Wisconsin to plan and prepare for the threat of Ebola virus disease. This was a descriptive study of the preparedness planning, infection prevention, and collaboration with public health agencies undertaken by 2 health systems in Wisconsin between September and December 2014. The preparedness approach used by the 2 health systems relied successfully on their robust infrastructure for planning and infection prevention. In the setting of rapidly evolving guidance and unprecedented fear regarding Ebola, the 2 health systems enhanced their response through collaboration and coordination with each other and government public health agencies. Key lessons learned included the importance of a rigorous planning process, robust infection prevention practices, and coalitions between public and private health sectors. The potential threat of Ebola virus disease stimulated emergency preparedness in which acute care facilities played a leading role in the public health response. Leveraging the existing expertise of health systems is essential when faced with emerging infectious diseases. (Disaster Med Public Health Preparedness. 2016;10:691-697).

  8. 49 CFR 613.200 - Statewide transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  9. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  10. 30 CFR 75.161 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  11. JAERI/U.S. collaborative program on fusion blanket neutronics

    International Nuclear Information System (INIS)

    Nakagawa, Masayuki; Mori, Takamasa; Kosako, Kazuaki; Oyama, Yukio; Nakamura, Tomoo

    1989-10-01

    Phase IIa and IIb experiments of JAERI/U.S. Collaborative Program on Fusion Blanket Neutronics have been performed using the FNS facility at JAERI. The phase IIa experimental systems consist of the Li 2 O test region, the rotating neutron target and the Li 2 CO 3 container. In phase IIb, a beryllium layer is added to the inner wall to investigate a multiplier effect. Measured parameters are source characteristics by a foil activation method and spectrum measurements using both NE-213 and proton recoil counters. The measurements inside the Li 2 O region included tritium production rates, reaction rate by foil activation and neutron spectrum measurements. Analysis for these parameters was performed by using two dimensional discrete ordinate codes DOT3.5 and DOT-DD, and a Monte Carlo code MORSE-DD. The nuclear data used were based on JENDL3/PR1 and PR2. ENDF/B-IV, V and the FNS file were used as activation cross sections. The configurations analysed for the test region were a reference, a beryllium front and a beryllium sandwiched systems in phase IIa, and a reference and a beryllium front with first wall systems in phase IIb. This document describes the results of analysis and comparison between the calculations and the measurements. The prediction accuracy of key parameters in a fusion reactor blanket are examined. The tritium production rates can be well predicted in the reference systems but are fairly underestimated in the system with a beryllium multiplier. Details of experiments and the experimental techniques are described separately in the another report. (author)

  12. Standard Review Plan Update and Development Program

    International Nuclear Information System (INIS)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures

  13. Standard Review Plan Update and Development Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  14. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  15. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  16. The National Workforce Assistance Collaborative: A New Institution with Plans To Improve Workforce Services.

    Science.gov (United States)

    Bergman, Terri

    The National Workforce Assistance Collaborative (NWAC) was established by the National Alliance of Business to provide assistance to community colleges and other organizations that offer programs to increase business productivity. The NWAC is charged with building the capacity of service providers that work with small and mid-sized companies in…

  17. Secure environment for real-time tele-collaboration on virtual simulation of radiation treatment planning.

    Science.gov (United States)

    Ntasis, Efthymios; Maniatis, Theofanis A; Nikita, Konstantina S

    2003-01-01

    A secure framework is described for real-time tele-collaboration on Virtual Simulation procedure of Radiation Treatment Planning. An integrated approach is followed clustering the security issues faced by the system into organizational issues, security issues over the LAN and security issues over the LAN-to-LAN connection. The design and the implementation of the security services are performed according to the identified security requirements, along with the need for real time communication between the collaborating health care professionals. A detailed description of the implementation is given, presenting a solution, which can directly be tailored to other tele-collaboration services in the field of health care. The pilot study of the proposed security components proves the feasibility of the secure environment, and the consistency with the high performance demands of the application.

  18. Strategic innovation between PhD and DNP programs: Collaboration, collegiality, and shared resources.

    Science.gov (United States)

    Edwards, Joellen; Rayman, Kathleen; Diffenderfer, Sandra; Stidham, April

    2016-01-01

    At least 111 schools and colleges of nursing across the nation provide both PhD and DNP programs (AACN, 2014a). Collaboration between nurses with doctoral preparation as researchers (PhD) and practitioners (DNP) has been recommended as essential to further the profession; that collaboration can begin during the educational process. The purpose of this paper is to describe the development and implementation of successful DNP and PhD program collaboration, and to share the results of that collaboration in an educational setting. Faculty set strategic goals to maximize the effectiveness and efficiency of both new DNP and existing PhD programs. The goals were to promote collaboration and complementarity between the programs through careful capstone and dissertation differentiation, complementary residency activities, joint courses and inter-professional experiences; promote collegiality in a blended on-line learning environment through shared orientation and intensive on-campus sessions; and maximize resources in program delivery through a supportive organizational structure, equal access to technology support, and shared faculty responsibilities as appropriate to terminal degrees. Successes such as student and faculty accomplishments, and challenges such as managing class size and workload, are described. Collaboration, collegiality and the sharing of resources have strengthened and enriched both programs and contributed to the success of students, faculty. These innovative program strategies can provide a solid foundation for DNP and PhD collaboration. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Collaborative Optimization of Stop Schedule Plan and Ticket Allotment for the Intercity Train

    Directory of Open Access Journals (Sweden)

    Xichun Chen

    2016-01-01

    Full Text Available As regards the ticket allotment issue of the intercity passenger corridor designed for different train grades, the matching relationship between the ticket allotment and the passenger flow demand is studied. The passenger flow conversion equation which is based on the collaborative optimization of the intercity train stop schedule plan and ticket allotment is established. Then the mathematical model aiming at the maximum revenue of intercity train system and the highest satisfaction from the passengers is established. The particle swarm harmony search algorithm is designed to solve the model. The example verifies the effectiveness of the model and algorithm, which indicates that, through the collaborative optimization of the stop schedule plan and ticket allotment for different grades intercity trains, the sectional utilization rate of the train can be improved; meanwhile, the optimum matching between the intercity train revenue and the passenger satisfaction can be realized.

  20. Patient admission planning using Approximate Dynamic Programming

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Mes, Martijn R.K.; Boucherie, Richardus J.; Hans, Elias W.

    2016-01-01

    Tactical planning in hospitals involves elective patient admission planning and the allocation of hospital resource capacities. We propose a method to develop a tactical resource allocation and patient admission plan that takes stochastic elements into consideration, thereby providing robust plans.

  1. NRC Seismic Design Margins Program Plan

    International Nuclear Information System (INIS)

    Cummings, G.E.; Johnson, J.J.; Budnitz, R.J.

    1985-08-01

    Recent studies estimate that seismically induced core melt comes mainly from earthquakes in the peak ground acceleration range from 2 to 4 times the safe shutdown earthquake (SSE) acceleration used in plant design. However, from the licensing perspective of the US Nuclear Regulatory Commission, there is a continuing need for consideration of the inherent quantitative seismic margins because of, among other things, the changing perceptions of the seismic hazard. This paper discusses a Seismic Design Margins Program Plan, developed under the auspices of the US NRC, that provides the technical basis for assessing the significance of design margins in terms of overall plant safety. The Plan will also identify potential weaknesses that might have to be addressed, and will recommend technical methods for assessing margins at existing plants. For the purposes of this program, a general definition of seismic design margin is expressed in terms of how much larger that the design basis earthquake an earthquake must be to compromise plant safety. In this context, margin needs to be determined at the plant, system/function, structure, and component levels. 14 refs., 1 fig

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  3. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  4. 25 CFR 87.9 - Programming aspects of plans.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  5. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  6. Proceedings of the flexible, midsize gas turbine program planning workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

  7. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  8. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  9. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  10. On the Interface Between Automated Predictive Demand Planning Techniques and Humans in Collaborative Planning Processes

    DEFF Research Database (Denmark)

    Schorsch, Timm; Wallenburg, Carl Marcus; Wieland, Andreas

    The introduction of big data and predictive analytics techniques in the supply chain context constitutes a “hot topic” in both research and practice. Without arguing against this euphoria, this paper critically assesses the consequences of confronting human actors with an increasing usage...... of these techniques. The underlying case of this paper refers to collaborative supply chain processes that are predestinated for integrating new big data and predictive analytics techniques. By building a theoretical framework for deriving sound hypothesis and introducing and testing the experimental design...

  11. The Proposed Model of Collaborative Virtual Learning Environment for Introductory Programming Course

    Science.gov (United States)

    Othman, Mahfudzah; Othman, Muhaini

    2012-01-01

    This paper discusses the proposed model of the collaborative virtual learning system for the introductory computer programming course which uses one of the collaborative learning techniques known as the "Think-Pair-Share". The main objective of this study is to design a model for an online learning system that facilitates the…

  12. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  13. Family planning program: world review 1974. Introduction.

    Science.gov (United States)

    Watson, W B; Lapham, R J

    1975-08-01

    The 1974 Population Conference at Bucharest was marked with controversy between developed and developing countries, with the latter strongly critical of aid for population control but less for social and economic development. The Plan of Action which was finally approved emphasized the importance of social and economic factors in relation to population growth while recommending that couples in all nations should have access to family planning information. Different regions of the world, however, have widely divergent population policies and goals. The Asia-Pacific region of the developing world, which has 3/4 of the population of the developing world, has articulated a strong stance in favor of reducing birth rates at Post-Bucharest Consultation. Government-supported family planning programs are seen as a high priority item to reduce rapid population growth. Rapid population growth is not seen as a high-priority problem in most African, Arab, and Latin American countries. Population problems will be solved with economic and social advancement. There is more concern in Latin America for family planning as a "human right" issue than to promote demographic goals. Latin America was also concerned with migration/urbanization issues. All of the Regional Consultations after Bucharest favored a greater emphasis on population in development planning, concern for the problems caused by migration and urbanization, improvement in the status of women, and support for the reduction of mortality levels. Some 74 countries containing 93% of the population of the developing world, supported family planning, with only 4 populous countries -- Burma, Ethiopia, Peru, and North Korea not in support. More than 98% of the population of Asia lives in countries which support family planning; the figures are 94% for Latin America, 90% for the Middle East and North Africa and 64% for Sub-Saharan Africa. The governments of 39 countries with a combined population of 2.3 billion have stated that

  14. Resource Allocation Optimization Model of Collaborative Logistics Network Based on Bilevel Programming

    Directory of Open Access Journals (Sweden)

    Xiao-feng Xu

    2017-01-01

    Full Text Available Collaborative logistics network resource allocation can effectively meet the needs of customers. It can realize the overall benefit maximization of the logistics network and ensure that collaborative logistics network runs orderly at the time of creating value. Therefore, this article is based on the relationship of collaborative logistics network supplier, the transit warehouse, and sellers, and we consider the uncertainty of time to establish a bilevel programming model with random constraints and propose a genetic simulated annealing hybrid intelligent algorithm to solve it. Numerical example shows that the method has stronger robustness and convergence; it can achieve collaborative logistics network resource allocation rationalization and optimization.

  15. Nuclear Plant Aging Research (NPAR) program plan

    International Nuclear Information System (INIS)

    1991-06-01

    A comprehensive Nuclear Plant Aging Research (NPAR) Program was implemented by the US NRC office of Nuclear Regulatory Research in 1985 to identify and resolve technical safety issues related to the aging of systems, structures, and components in operating nuclear power plants. This is Revision 2 to the Nuclear Plant Aging Research Program Plant. This planes defines the goals of the program the current status of research, and summarizes utilization of the research results in the regulatory process. The plan also describes major milestones and schedules for coordinating research within the agency and with organizations and institutions outside the agency, both domestic and foreign. Currently the NPAR Program comprises seven major areas: (1) hardware-oriented engineering research involving components and structures; (2) system-oriented aging interaction studies; (3) development of technical bases for license renewal rulemaking; (4) determining risk significance of aging phenomena; (5) development of technical bases for resolving generic safety issues; (6) recommendations for field inspection and maintenance addressing aging concerns; (7) and residual lifetime evaluations of major LWR components and structures. The NPAR technical database comprises approximately 100 NUREG/CR reports by June 1991, plus numerous published papers and proceedings that offer regulators and industry important insights to aging characteristics and aging management of safety-related equipment. Regulatory applications include revisions to and development of regulatory guides and technical specifications; support to resolve generic safety issues; development of codes and standards; evaluation of diagnostic techniques; (e.g., for cables and valves); and technical support for development of the license renewal rule. 80 refs., 25 figs., 10 tabs

  16. Building A Collaborative And Distributed E&O Program For EarthScope

    Science.gov (United States)

    Hall-Wallace, M. K.; Boyd, T.; Richard, G.; Ellins, K.; Meertens, C.; Semken, S.; Taber, J.; Benthien, M.; Wald, L.; Marvinney, R.

    2003-12-01

    EarthScope's education and outreach (E&O) mission is to ensure that the EarthScope experiment creates as its legacy a public more knowledgeable and understanding of the scientific and societal contributions made by the EarthScope experiment and Earth science. It will fulfill this commitment by developing and disseminating programs and products that utilize the data, models, technology and discoveries of EarthScope. The EarthScope Education and Outreach Network (EON), consisting of local EON alliances, the EarthScope facilities, partner organizations and a coordinating office, will facilitate this E&O mission. The local EON alliances, which will vary in size and purpose to respond quickly and to meet the specific needs in a region, will carry out the bulk of the effort. Thus, EarthScope EON can provide customized services that engage culturally, economically and geographically diverse audiences at the national and local scales. The EarthScope facilities and research community will provide access to data, models, and visualization tools for educational purposes. Partnerships with other national and local science education and outreach programs at colleges, universities, research facilities and professional societies within the EarthScope community as well as relevant programs at museums and parks, state geologic surveys and emergency management agencies, and K-12 schools are critical to EON's success. These partnerships will allow EON to use existing resources, networks and expertise to gear up quickly and efficiently. As EON develops, it will reciprocate by contributing new resources and expertise to the partnerships that help improve public understanding of Earth systems overall and promote effective application of EarthScope discoveries. In this presentation, we will outline major programs and products envisioned for EarthScope, plans for evaluating those programs locally and nationally, and mechanisms for collaborating with existing E&O programs.

  17. Networking: a study in planning and developing cross-cultural collaboration

    Directory of Open Access Journals (Sweden)

    Sanjeev Singh

    2002-12-01

    Full Text Available This paper reports on a collaboration between the authors at the University of Brighton (UK and the University of Delhi, South Campus. The collaboration came about as a result of the EU-India Cross-Cultural Innovation Network collaboration programme, a project involving several universities and organizations across Europe and India. The authors of this paper both lecture in the area of computer networking. Following meetings in Delhi, they agreed to work together to produce a Web-based networking resource to be generated by the students of both institutions. The first phase of development involved the mounting of Web-based tutorials and documents produced by the students. The second phase will centre on the development of a knowledge base generated by the interaction of the students within an asynchronous forum. Running alongside these phases will be a collaborative bookmarking system, a database in which the students will post URLs of Web-based resources that they find useful in their studies. This system incorporates a form of collaborative filtering, an evolutionary mechanism which seeks to embody the qualities that students value in resources to provide a dynamic set of ratings to assist in the selection of those of most use. The planning of such a system raises some unusual issues, not least in the process of collaboration itself, with concerns as diverse as technical compatibility, institutional and cultural differences, timezones and the reliability of email. Limited bandwidth between our institutions causes special problems with the interactive elements of the resource. We present the methods we are investigating to reduce the impact of this. The fact that the students share an intellectual discipline but are otherwise separated by a cultural and geographical divide is expected to lead to fruitful diversity in thinking and approaches to problem-solving.

  18. Research program plan: piping. Volume 3

    International Nuclear Information System (INIS)

    Vagins, M.; Strosnider, J.

    1985-07-01

    Regulatory issues related to piping can be divided into the three areas of pipe cracking, postulated design basis pipe breaks, and design of piping for seismic and other dynamic loads. The first two of these issues are in the domain of the Materials Engineering Branch (MEBR), while the last of the three issues is the responsibility of the Mechanical/Structural Engineering Branch. This volume of the MEBR Research Plan defines the critical aspects of the pipe cracking and postulated design basis pipe break issues and identifies those research efforts and results necessary for their resolution. In general, the objectives of the MERB Piping Research Program are to provide experimentally validated analytic techniques and appropriate material properties characterization methods and data to support regulatory activities related to evaluating and ensuring piping integrity

  19. U.S. photovoltaic program plan

    International Nuclear Information System (INIS)

    Annan, R.H.

    1993-01-01

    The US Photovoltaic Program stands midway into its Five-Year Plan, 1991--1995. Compared to previous periods, the progress and momentum of the past year and a half has been unprecedented on all fronts from record efficiencies in the laboratory, to advances in manufacturing, progress in PV industry scale-up, new applications, a more favorable regulatory environment, and growing market opportunities, both domestically and internationally. All of this activity is happening in the context of a new administration which supports accelerated development of environmental technologies. The DOE is committed to keeping this momentum alive to ensure US leadership in the growing photovoltaic market. The purpose of this paper is to give an update of the exciting progress and discuss ways to build on this momentum

  20. Chaperoning: Practices of collaboration in the Panama Canal Expansion Program

    NARCIS (Netherlands)

    Smits, K.C.M.; van Marrewijk, A.H.

    2012-01-01

    PurposeThe purpose of this paper is to examine how project partners respond to contractually agreed collaboration in an infrastructural megaproject. Problematic performances of megaprojects have shifted away attention from the instrumental towards the interpretative, focusing on daily work life,

  1. Manifestations of metacognitive activity during the collaborative planning of chemistry practical investigations

    Science.gov (United States)

    Mathabathe, Kgadi Clarrie; Potgieter, Marietjie

    2017-07-01

    This paper elaborates a process followed to characterise manifestations of cognitive regulation during the collaborative planning of chemistry practical investigations. Metacognitive activity was defined as the demonstration of planning, monitoring, control and evaluation of cognitive activities by students while carrying out the chemistry task. Inherent in collaborative learning is the social aspect of metacognition, which in this study was evidenced in social cognitive regulation (notably of intra- and interpersonal metacognitive regulations) as groups of students went about planning their practical investigations. Discussions of two of the learning groups (n = 4; n = 3) as they planned the extended practical investigation were recorded, transcribed and analysed for indicators of any inherent metacognitive activity. The process of characterising the manifestations of metacognition resulted in the development of a coding system which specifies not only the regulatory strategies at play but the type of regulation (self or other), the area of regulation (cognition, task performance or behaviour) as well as the depth of regulatory contributions (high or low). The fine-grained coding system allowed for a finer theoretical elucidation of the social nature of metacognition. The implications of this study for metacognition and chemistry education research are highlighted.

  2. Severe Accident Research Program plan update

    International Nuclear Information System (INIS)

    1992-12-01

    In August 1989, the staff published NUREG-1365, ''Revised Severe Accident Research Program Plan.'' Since 1989, significant progress has been made in severe accident research to warrant an update to NUREG-1365. The staff has prepared this SARP Plan Update to: (1) Identify those issues that have been closed or are near completion, (2) Describe the progress in our understanding of important severe accident phenomena, (3) Define the long-term research that is directed at improving our understanding of severe accident phenomena and developing improved methods for assessing core melt progression, direct containment heating, and fuel-coolant interactions, and (4) Reflect the growing emphasis in two additional areas--advanced light water reactors, and support for the assessment of criteria for containment performance during severe accidents. The report describes recent major accomplishments in understanding the underlying phenomena that can occur during a severe accident. These include Mark I liner failure, severe accident scaling methodology, source term issues, core-concrete interactions, hydrogen transport and combustion, TMI-2 Vessel Investigation Project, and direct containment heating. The report also describes the major planned activities under the SARP over the next several years. These activities will focus on two phenomenological issues (core melt progression, and fuel-coolant interactions and debris coolability) that have significant uncertainties that impact our understanding and ability to predict severe accident phenomena and their effect on containment performance SARP will also focus on severe accident code development, assessment and validation. As the staff completes the research on severe accident issues that relate to current generation reactors, continued research will focus on efforts to independently evaluate the capability of new advanced light water reactor designs to withstand severe accidents

  3. FY1983 HTGR summary level program plan

    International Nuclear Information System (INIS)

    1983-01-01

    The major focus and priority of the FY1983 HTGR Program is the development of the HTGR-SC/C Lead Project through one of the candidate lead utilities. Accordingly, high priority will be given to work described in WBS 04 for site and user specific studies toward the development of the Lead Project. Asessment of advanced HTGR systems will continue during FY1983 in accordance with the High Temperature Process Heat (HTPH) Concept Evaluation Plan. Within the context of that plan, the assessment of the monolithic HTPH concepts has been essentially completed in FY1982 and FY1983 activities and will be limited to documentation only. the major advanced HTGR systems efforts in FY1983 will be focused on the further definition of the Modular Reactor Systems concepts in both the reforming (MRS-R) and Steam Cycle/Cogeneration 9MRS-SC/C) configurations in WBS 41. The effort will concentrate upon key technical issues and trade studies oriented to reduction in expected cost and schedule duration. With regard to the latter, the most significant will be trade study addressing the degree of modularization of reactor plant structures. particular attention will be given to the confinement building which currently defines the critical path for construction

  4. ORNL Isotopes Facilities Shutdown Program Plan

    International Nuclear Information System (INIS)

    Gibson, S.M.; Patton, B.D.; Sears, M.B.

    1990-10-01

    This plan presents the results of a technical and economic assessment for shutdown of the Oak Ridge National Laboratory (ORNL) isotopes production and distribution facilities. On December 11, 1989, the Department of Energy (DOE), Headquarters, in a memorandum addressed to DOE Oak Ridge Operations Office (DOE-ORO), gave instructions to prepare the ORNL isotopes production and distribution facilities, with the exception of immediate facility needs for krypton-85, tritium, and yttrium-90, for safe shutdown. In response to the memorandum, ORNL identified 17 facilities for shutdown. Each of these facilities is located within the ORNL complex with the exception of Building 9204-3, which is located at the Y-12 Weapons Production Plant. These facilities have been used extensively for the production of radioactive materials by the DOE Isotopes Program. They currently house a large inventory of radioactive materials. Over the years, these aging facilities have inherited the problems associated with storing and processing highly radioactive materials (i.e., facilities' materials degradation and contamination). During FY 1990, ORNL is addressing the requirements for placing these facilities into safe shutdown while maintaining the facilities under the existing maintenance and surveillance plan. The day-to-day operations associated with the surveillance and maintenance of a facility include building checks to ensure that building parameters are meeting the required operational safety requirements, performance of contamination control measures, and preventative maintenance on the facility and facility equipment. Shutdown implementation will begin in FY 1993, and shutdown completion will occur by the end of FY 1994

  5. Evaluating collaborative planning methods supporting programmebased planning in natural resource management

    Czech Academy of Sciences Publication Activity Database

    Vacik, H.; Kurttila, M.; Hujala, T.; Khadka, Chiranjeewee; Haara, A.; Pykäläinen, J.; Honkakoski, P.; Wolfslehner, B.

    2014-01-01

    Roč. 144, NOV 2014 (2014), s. 304-315 ISSN 0301-4797 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : participatory planning * group decision making * problem identification * problem modeling * problem solving * natural resource management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.723, year: 2014

  6. The Hemingway Project: A Collaborative School-based Program for Teacher Certification.

    Science.gov (United States)

    Butler, Shannon K.; And Others

    At Weber State University (Utah), teacher educators have collaborated with English faculty to design a pilot program (Hemingway Project) which serves as an initial effort to restructure the teacher education program. The program, funded by the Hemingway Foundation, is intended to provide greater integration of the university experience with actual…

  7. Shared Decision-Making in Youth Mental Health Care: Using the Evidence to Plan Treatments Collaboratively.

    Science.gov (United States)

    Langer, David A; Jensen-Doss, Amanda

    2016-12-02

    The shared decision-making (SDM) model is one in which providers and consumers of health care come together as collaborators in determining the course of care. The model is especially relevant to youth mental health care, when planning a treatment frequently entails coordinating both youth and parent perspectives, preferences, and goals. The present article first provides the historical context of the SDM model and the rationale for increasing our field's use of SDM when planning psychosocial treatments for youth and families. Having established the potential utility of SDM, the article then discusses how to apply the SDM model to treatment planning for youth psychotherapy, proposing a set of steps consistent with the model and considerations when conducting SDM with youth and families.

  8. GSG-GIS development program plan

    International Nuclear Information System (INIS)

    Lee, R.C.

    1992-01-01

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS)

  9. Burning through organizational boundaries? Examining inter-organizational communication networks in policy-mandated collaborative bushfire planning groups

    Science.gov (United States)

    Rachel F. Brummel; Kristen C. Nelson; Pamela J. Jakes

    2012-01-01

    Collaboration can enhance cooperation across geographic and organizational scales, effectively "burning through" those boundaries. Using structured social network analysis (SNA) and qualitative in-depth interviews, this study examined three collaborative bushfire planning groups in New South Wales, Australia and asked: How does participation in policy-...

  10. Travail, transparency and trust : a case study of computer-supported collaborative supply chain planning in high-tech electronics

    NARCIS (Netherlands)

    Akkermans, H.A.; Bogerd, P.; van Doremalen, J.B.M.

    2004-01-01

    Describes a case study of supply chain collaboration facilitated by a decision support environment in a high-tech electronics supply chain with multiple independent companies. In a business process called collaborative planning, representatives from these companies jointly take decisions regarding

  11. Social learning in a policy-mandated collaboration: Community wildfire protection planning in the eastern United States

    Science.gov (United States)

    Rachel F. Brummel; Kristen C. Nelson; Pamela J. Jakes; Daniel R. Williams

    2010-01-01

    Policies such as the US Healthy Forests Restoration Act (HFRA) mandate collaboration in planning to create benefits such as social learning and shared understanding among partners. However, some question the ability of top-down policy to foster successful local collaboration. Through in-depth interviews and document analysis, this paper investigates social learning and...

  12. Preventing Elder Abuse: The Texas Plan for a Coordinated Service Delivery System. Collaborative Elder Abuse Prevention Project.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide Collaborative Elder Abuse Prevention project. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for achieving a coordinated service delivery system for…

  13. GateWay Community College Water Resources Program Partnerships: An Opportunity for Program Success and Collaboration

    Science.gov (United States)

    Castaneda, M.

    2012-12-01

    objective is to utilize the latest field equipment that will be used by the students when they incorporate into the job market place. The GateWay WRT program is always looking for articulation opportunities with four-year universities. Although not all WRT students are interested in pursuing a four-year degree as part of their professional development, some students welcome this opportunity. GateWay WRT program is finalizing articulation agreements with the University of Arizona's Hydrology and Water Resources Program as well as with the Arizona State University Environmental Management program. Also, the WRT program is trying to internationalize its curriculum by establishing contacts with similar programs in other countries. The University of Guanajuato from Mexico has shown interest in exchanging not only students but also faculty through this process. The WRT program puts emphasis in service learning activities by collaborating and helping community groups such the Lindon Park Neighborhood Association and The Environmental Community Outreach Association. Both groups are in charge of disseminating environmental information to the community regarding superfund site issues. The WRT program has supported several paid internships to increase the community awareness on these technical issues.

  14. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  15. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  16. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  17. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  18. PFR/TREAT program: objectives, accomplishments, and plans

    International Nuclear Information System (INIS)

    Cowking, C.B.; Alter, H.; Stillwell, J.; Wood, M.H.; Woods, W.J.; Culley, G.E.; Klickman, A.E.; Borys, S.S.

    1984-01-01

    The PFR-TREAT collaborative program of transient safety testing of fast reactor fuel was established in 1979 to provide mutual advantage to USDOE and the UKAEA through irradiation of US and UK full-length fuel pins in PFR, followed by safety testing in TREAT. The tests which were planned include Transient Over-Power (TOP) and Transient Under-Cooling with Over-Power (TUCOP) tests to fuel destruction and re-distribution; the results will provide significant new information on fuel and cladding behavior in hypothetical reactor faults. The information obtained in both US and UK fuel pins is to be interpreted by both partners and published jointly when mutually agreed. Thirteen tests, on fresh and irradiated fuel, in single-pin and 7-pin test sections, were completed by the end of 1983. The test matrix, which is currently being re-evaluated, calls for additional tests to be run under the present agreement. There has been an extensive program of post irradiation examination of sibling pins in both the UK and the US to characterize the test fuel prior to destructive irradiation, including testing of irradiated cladding to determine its failure characteristics

  19. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  20. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  1. Combining Activity DSM with Temporal Logic for Collaborative Planning and Scheduling

    Directory of Open Access Journals (Sweden)

    Mathieu Baudin

    2013-09-01

    Full Text Available This work presents an approach that implements enhanced scheduling algorithms to plan and schedule interventions in scientific facilities emitting various types of ionizing radiation such as the ones present at CERN in Geneva, (Switzerland or at GSI in Darmstadt (Germany. To deal with the collaborative process of activity creation and submission used in those organizations, we propose a framework to set the appropriate sequence or skeleton for the activities. This framework combines Allen's Interval Algebra and DSM (Design Structure Matrix. It enables the sequence of activities to be automatically computed while gathering and taking into account the needs of users and testing their compatibility. It also deals with technical-type or resource-type constraints between activities as well as incompatible submissions. The work described in this paper includes details of the collaborative submission process and introduces suggestions for compromising as well as temporal calculations with the introduction of parameterized DSMs rather than binary ones.

  2. Developing a national dissemination plan for collaborative care for depression: QUERI Series

    Directory of Open Access Journals (Sweden)

    Rubenstein Lisa V

    2008-12-01

    Full Text Available Abstract Background Little is known about effective strategies for disseminating and implementing complex clinical innovations across large healthcare systems. This paper describes processes undertaken and tools developed by the U.S. Department of Veterans Affairs (VA Mental Health Quality Enhancement Research Initiative (MH-QUERI to guide its efforts to partner with clinical leaders to prepare for national dissemination and implementation of collaborative care for depression. Methods An evidence-based quality improvement (EBQI process was used to develop an initial set of goals to prepare the VA for national dissemination and implementation of collaborative care. The resulting product of the EBQI process is referred to herein as a "National Dissemination Plan" (NDP. EBQI participants included: a researchers with expertise on the collaborative care model for depression, clinical quality improvement, and implementation science, and b VA clinical and administrative leaders with experience and expertise on how to adapt research evidence to organizational needs, resources and capacity. Based on EBQI participant feedback, drafts of the NDP were revised and refined over multiple iterations before a final version was approved by MH-QUERI leadership. 'Action Teams' were created to address each goal. A formative evaluation framework and related tools were developed to document processes, monitor progress, and identify and act upon barriers and facilitators in addressing NDP goals. Results The National Dissemination Plan suggests that effectively disseminating collaborative care for depression in the VA will likely require attention to: Guidelines and Quality Indicators (4 goals, Training in Clinical Processes and Evidence-based Quality Improvement (6 goals, Marketing (7 goals, and Informatics Support (1 goal. Action Teams are using the NDP as a blueprint for developing infrastructure to support system-wide adoption and sustained implementation of

  3. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  4. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    International Nuclear Information System (INIS)

    Seamans, J.A.

    1995-01-01

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification

  5. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  6. Facilitating State-Wide Collaboration around Family Planning Care in the Context of Zika.

    Science.gov (United States)

    Dehlendorf, Christine; Gavin, Loretta; Witt, Jacki; Moskosky, Susan

    Family planning providers have an important role to play in the response to the public health challenge posed by Zika. In the United States, there are high rates of unintended pregnancy, especially in states most at risk for mosquito-borne transmission of the Zika virus. This paper describes efforts by eight of these states (Arizona, California, Florida, Georgia, Louisiana, Mississippi, South Carolina, and Texas) to build capacity for quality family planning care in the context of Zika. Drawing on resources developed by the Office of Population Affairs, including a toolkit for family planning care in the context of Zika, agencies and stakeholders involved in the family planning delivery system in Southern states at risk for mosquito-borne transmission met over several months in the summer of 2016 to coordinate efforts to respond to the risk of Zika in their jurisdictions. Through proactive communication and collaboration, states took steps to integrate Zika-related family planning care, including screening for Zika risk and providing appropriate, client-centered counseling. Challenges faced by the states included not having family planning included as a component of their state's Zika response effort, limited funding for family planning activities, and the need for robust communication networks between multiple state and federal agencies. The efforts described in this paper can help other states to integrate family planning into their Zika response. This is relevant to all states; even when mosquito-borne transmission is not occurring or expected, all states experience travel-related and sexually transmitted Zika infections. Copyright © 2017 Jacobs Institute of Women's Health. All rights reserved.

  7. Exploration Technology Program plans and directions

    Science.gov (United States)

    Aldrich, A.; Rosen, R.; Craig, M.; Mankins, J. C.

    During the first part of the next century, the United States will return to the Moon to create a permanent lunar base, and, before the year 2019, we will send a human mission to Mars. In addition to these human operations, the Space Exploration Initiative will integrally incorporate robotic lunar and Mars missions. In achieving these efforts to expand human presence and activity in space and also exerted and frontiers of human knowledge, the SEI will require an array of new technologies. Mission architecture definition is still underway, but previous studies indicate that the SEI will require developments in areas such as advanced engines for space transportation, in-space assembly and construction to support permanent basing of exploration systems in space, and advanced surface operations capabilities including adequate levels of power and surface roving vehicles, and technologies to support safely long-duration human operations in space. Plans are now being put into place to implement an Exploration Technology Program (ETP) which will develop the major technologies needed for SEI. In close coordination with other ongoing U.S. government research and development efforts, the ETP will provide in the near term clear demonstrations of potential exploration technologies, research results to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. In addition to the technology needed for the first round of SEI missions, the ETP will also put in place a foundation of research for longer-term technology needs—ultimately leading the human missions to Mars. The Space Exploration Initiative and the Exploration Technology Program will challenge the best and the brightest minds across government, industry and academia, inspiring students of all ages and making possible future terrestial applications of SEI technologies that may create whole new industries for the future.

  8. A DICOM based radiotherapy plan database for research collaboration and reporting

    International Nuclear Information System (INIS)

    Westberg, J; Krogh, S; Brink, C; Vogelius, I R

    2014-01-01

    Purpose: To create a central radiotherapy (RT) plan database for dose analysis and reporting, capable of calculating and presenting statistics on user defined patient groups. The goal is to facilitate multi-center research studies with easy and secure access to RT plans and statistics on protocol compliance. Methods: RT institutions are able to send data to the central database using DICOM communications on a secure computer network. The central system is composed of a number of DICOM servers, an SQL database and in-house developed software services to process the incoming data. A web site within the secure network allows the user to manage their submitted data. Results: The RT plan database has been developed in Microsoft .NET and users are able to send DICOM data between RT centers in Denmark. Dose-volume histogram (DVH) calculations performed by the system are comparable to those of conventional RT software. A permission system was implemented to ensure access control and easy, yet secure, data sharing across centers. The reports contain DVH statistics for structures in user defined patient groups. The system currently contains over 2200 patients in 14 collaborations. Conclusions: A central RT plan repository for use in multi-center trials and quality assurance was created. The system provides an attractive alternative to dummy runs by enabling continuous monitoring of protocol conformity and plan metrics in a trial.

  9. A DICOM based radiotherapy plan database for research collaboration and reporting

    Science.gov (United States)

    Westberg, J.; Krogh, S.; Brink, C.; Vogelius, I. R.

    2014-03-01

    Purpose: To create a central radiotherapy (RT) plan database for dose analysis and reporting, capable of calculating and presenting statistics on user defined patient groups. The goal is to facilitate multi-center research studies with easy and secure access to RT plans and statistics on protocol compliance. Methods: RT institutions are able to send data to the central database using DICOM communications on a secure computer network. The central system is composed of a number of DICOM servers, an SQL database and in-house developed software services to process the incoming data. A web site within the secure network allows the user to manage their submitted data. Results: The RT plan database has been developed in Microsoft .NET and users are able to send DICOM data between RT centers in Denmark. Dose-volume histogram (DVH) calculations performed by the system are comparable to those of conventional RT software. A permission system was implemented to ensure access control and easy, yet secure, data sharing across centers. The reports contain DVH statistics for structures in user defined patient groups. The system currently contains over 2200 patients in 14 collaborations. Conclusions: A central RT plan repository for use in multi-center trials and quality assurance was created. The system provides an attractive alternative to dummy runs by enabling continuous monitoring of protocol conformity and plan metrics in a trial.

  10. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  11. Nuclear Plant Aging Research (NPAR) program plan

    International Nuclear Information System (INIS)

    1985-07-01

    The nuclear plant aging research described in this plan is intended to resolve issues related to the aging and service wear of equipment and systems at commercial reactor facilities and their possible impact on plant safety. Emphasis has been placed on identification and characterization of the mechansims of material and component degradation during service and evaluation of methods of inspection, surveillance, condition monitoring and maintenance as means of mitigating such effects. Specifically the goals of the program are as follows: (1) to identify and characterize aging and service wear effects which, if unchecked, could cause degradation of structures, components, and systems and thereby impair plant safety; (2) to identify methods of inspection, surveillance and monitoring, or of evaluating residual life of structures, components, and systems, which will assure timely detection of significant aging effects prior to loss of safety function; and (3) to evaluate the effectiveness of storage, maintenance, repair and replacement practices in mitigating the rate and extent of degradation caused by aging and service wear

  12. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  13. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, Chenwoo

    2009-01-01

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09.

  14. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  15. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  16. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  17. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  18. Accelerated Lane-Changing Trajectory Planning of Automated Vehicles with Vehicle-to-Vehicle Collaboration

    Directory of Open Access Journals (Sweden)

    Haijian Bai

    2017-01-01

    Full Text Available Considering the complexity of lane changing using automated vehicles and the frequency of turning lanes in city settings, this paper aims to generate an accelerated lane-changing trajectory using vehicle-to-vehicle collaboration (V2VC. Based on the characteristics of accelerated lane changing, we used a polynomial method and cooperative strategies for trajectory planning to establish a lane-changing model under different degrees of collaboration with the following vehicle in the target lane by considering vehicle kinematics and comfort requirements. Furthermore, considering the shortcomings of the traditional elliptical vehicle and round vehicle models, we established a rectangular vehicle model with collision boundary conditions by analysing the relationships between the possible collision points and the outline of the vehicle. Then, we established a simulation model for the accelerated lane-changing process in different environments under different degrees of collaboration. The results show that, by using V2VC, we can achieve safe accelerated lane-changing trajectories and simultaneously satisfy the requirements of vehicle kinematics and comfort control.

  19. Plans for a Collaboratively Developed Distributed Control System for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    DeVan, W.R.; Gurd, D.P.; Hammonds, J.; Lewis, S.A.; Smith, J.D.

    1999-01-01

    The Spallation Neutron Source (SNS) is an accelerator-based pulsed neutron source to be built in Oak Ridge, Tennessee. The facility has five major sections - a ''front end'' consisting of a 65 keV H - ion source followed by a 2.5 MeV RFQ; a 1 GeV linac; a storage ring; a 1MW spallation neutron target (upgradeable to 2 MW); the conventional facilities to support these machines and a suite of neutron scattering instruments to exploit them. These components will be designed and implemented by five collaborating institutions: Lawrence Berkeley National Laboratory (Front End), Los Alamos National Laboratory (Linac); Brookhaven National Laboratory (Storage Ring); Argonne National Laboratory (Instruments); and Oak Ridge National Laboratory (Neutron Source and Conventional Facilities). It is proposed to implement a fully integrated control system for all aspects of this complex. The system will be developed collaboratively, with some degree of local autonomy for distributed systems, but centralized accountability. Technical integration will be based upon the widely-used EPICS control system toolkit, and a complete set of hardware and software standards. The scope of the integrated control system includes site-wide timing and synchronization, networking and machine protection. This paper discusses the technical and organizational issues of planning a large control system to be developed collaboratively at five different institutions, the approaches being taken to address those issues, as well as some of the particular technical challenges for the SNS control system

  20. The Development of Professional Empowerment Program for Principals by Interorganizational Collaboration and Action Research

    Directory of Open Access Journals (Sweden)

    Peiying Chen

    2015-06-01

    Full Text Available As an action research approach through interorganizational collaboration, this study aims to develop an effective professional learning program for enhancing principals’ leadership. There are three phases in this research: program design, implementation, and feedback and reflection. With a comprehensive literature review and focus group interviews, key competences of leadership were identified. The program contents were designed through interorganizational collaboration between academics, local officers, experienced principals, and NGO practitioners. The program contains self-awareness and team building in the dark, leading for the future, curriculum and instructional leadership, systems thinking, Understanding by Design, framework and practice, and World Café dialogue. In Phase II, a four-day workshop program has been held twice in the summer of 2012. Learning feedback was posted on Facebook as informal formative evaluation during the implementation phase. In phase III, opinions and feedbacks from learners, external observers, and curriculum designers were collected to assess the effectiveness of the program. The challenges and revision ideas were proposed at the end of the paper. Through the cycle of “design-act-feedback-revision” of action research with interorganizational collaboration, the present professional development program for principals can be refined and better empower school leaders with new ways of situated learning, collaboration, and reflective thinking. Although this program has been implemented for a few times in the past two years, this paper only explained and discussed the merits and effects of the workshops implemented in the summer of 2012.

  1. Sustainable Agriculture and Natural Resource Management Collaborative Research Support Program(SANREM CRSP)

    OpenAIRE

    Moore, Keith M.

    2007-01-01

    This presentation describes the history and current program of the Sustainable Agriculture and Natural Resource Management Collaborative Research Support Program (SANREM CRSP). SANREM Objectives include increasing stakeholder income generation capacity, empowering stakeholders, particularly women, enhancing decentralized resource management, strengthening local institutions, improving market access for smallholders and communities, and promoting sustainable and environmentally sound developme...

  2. Quantifying Collaboration Using Himmelman's Strategies for Working Together: Findings from the Tennessee Coordinated School Health Program

    Science.gov (United States)

    Quinn, Megan A; Southerland, Jodi L.; Richards, Kasie; Slawson, Deborah L; Behringer, Bruce; Johns-Womack, Rebecca; Smith, Sara

    2016-01-01

    Purpose: Coordinated school health programs (CSHPs), a type of health promoting school (HPS) program adopted by Canada and the USA, were developed to provide a comprehensive approach to school health in the USA. Community partnerships are central to CSHP and HPS efforts, yet the quality of collaboration efforts is rarely assessed. The purpose of…

  3. 5 CFR 2424.10 - Collaboration and Alternative Dispute Resolution Program.

    Science.gov (United States)

    2010-01-01

    ... Alternative Dispute Resolution; Requesting and Providing Allegations Concerning the Duty To Bargain § 2424.10 Collaboration and Alternative Dispute Resolution Program. Where an exclusive representative and an agency are... and Alternative Dispute Resolution Program (CADR). Upon request, and as agreed upon by the parties...

  4. A High School Depression and Suicide Prevention Program: A Collaboration between Health Education and Psychological Services.

    Science.gov (United States)

    Moilanen, Donna L.; Bradbury, Susan

    2002-01-01

    Examined a collaboration between health education and psychological services in generating a high school depression and suicide prevention program. The five-component program raised awareness of teen depression and suicide, increased communication about these issues within the school and community, and provided information about available…

  5. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to

  6. Effects of a Patient-Provider, Collaborative, Medication-Planning Tool: A Randomized, Controlled Trial

    Directory of Open Access Journals (Sweden)

    James F. Graumlich

    2016-01-01

    Full Text Available Among patients with various levels of health literacy, the effects of collaborative, patient-provider, medication-planning tools on outcomes relevant to self-management are uncertain. Objective. Among adult patients with type II diabetes mellitus, we tested the effectiveness of a medication-planning tool (Medtable™ implemented via an electronic medical record to improve patients’ medication knowledge, adherence, and glycemic control compared to usual care. Design. A multicenter, randomized controlled trial in outpatient primary care clinics. 674 patients received either the Medtable tool or usual care and were followed up for up to 12 months. Results. Patients who received Medtable had greater knowledge about indications for medications in their regimens and were more satisfied with the information about their medications. Patients’ knowledge of drug indication improved with Medtable regardless of their literacy status. However, Medtable did not improve patients’ demonstrated medication use, regimen adherence, or glycemic control (HbA1c. Conclusion. The Medtable tool supported provider/patient collaboration related to medication use, as reflected in patient satisfaction with communication, but had limited impact on patient medication knowledge, adherence, and HbA1c outcomes. This trial is registered with ClinicalTrials.gov NCT01296633.

  7. 7 CFR 22.304 - Multiyear planning and programming.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  8. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    Science.gov (United States)

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  9. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  10. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    Science.gov (United States)

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  11. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  12. Light Water Reactor Sustainability Program Integrated Program Plan

    International Nuclear Information System (INIS)

    Griffith, George; Youngblood, Robert; Busby, Jeremy; Hallbert, Bruce; Barnard, Cathy; McCarthy, Kathryn

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  13. Light Water Reactor Sustainability Program Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  14. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  15. Seismic safety margin research program. Program plan, Revision I

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.

    1978-01-01

    The overall objective of the SSMRP is to develop mathematical models that realistically predict the probability of radioactive releases from seismically induced events in nuclear power plants. These models will be used for four purposes: (1) To perform sensitivity studies to determine the weak links in seismic methodology. The weak links will then be improved by research and development. (2) To estimate the probability of release for a plant. It is believed that the major difficulty in the program will be to obtain acceptably small confidence limits on the probability of release. (3) To estimate the conservatisms in the Standard Review Plan (SRP) seismic design methodology. This will be done by comparing the results of the SRP methodology and the methodology resulting from the research and development in (1). (4) To develop an improved seismic design methodology based on probability. The Phase I objective proposed in this report is to develop mathematical models which will accomplish the purposes No. 1 and No. 2 with simplified assumptions such as linear elastic analysis, limited assessment on component fragility (considering only accident sequences leading to core melt), and simplified safety system

  16. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  17. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  18. Light Water Reactor Sustainability Program: Integrated Program Plan

    International Nuclear Information System (INIS)

    2016-02-01

    and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

  19. Light Water Reactor Sustainability Program: Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-02-15

    proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

  20. Program plan recognition for year 2000 tools

    NARCIS (Netherlands)

    A. van Deursen (Arie); S. Woods; A. Quilici

    1997-01-01

    textabstractThere are many commercial tools that address various aspects of the Year 2000 problem. None of these tools, however, make any documented use of plan-based techniques for automated concept recovery. This implies a general perception that plan-based techniques is not useful for this

  1. Inspection Methods in Programming: Cliches and Plans.

    Science.gov (United States)

    1987-12-01

    part of the definition of the data plan. 44 THE PLAN (ALCULUS old:indexed-sequence I base: index: *sequence integer bump: oneplus update: new- term A...select-in dexred- sele¢ t-in dexed- sequence- base sequence-index,!’ sSdbump:. . oneplus ’,U a ," .update: " alter-term make: alter-indexed- sequence-index

  2. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  3. Minority International Research Training Program: Global Collaboration in Nursing Research.

    Science.gov (United States)

    McElmurry, Beverly J.; Misner, Susan J.; Buseh, Aaron G.

    2003-01-01

    The Minority International Research Training Program pairs minority nursing students with faculty mentors at international sites for short-term research. A total of 26 undergraduate, 22 graduate, and 6 postdoctoral students have participated. Challenges include recruitment, orientation, and preparation of students; identification and preparation…

  4. Global Access Programs: A Collaborative Approach for Effective Implementation and Management.

    Science.gov (United States)

    Ainge, Debra; Aitken, Suzanne; Corbett, Mark; De-Keyzer, David

    Global access programs (GAPs) provide access to medicinal products for patients with serious medical conditions and no commercially available treatment options. Providing early access to medicines can be challenging for a pharmaceutical company. The demand for a GAP often occurs at a time when other activities are the prime focus, such as delivery of pivotal clinical trials or gaining of marketing authorization. Furthermore, the skills, experience, and infrastructure necessary to implement and manage a successful GAP vary significantly from those required for regular clinical trial execution, and the regulatory environment presents its own challenges, with regulations often poorly defined and with considerable inter-country variation. This article considers the triggers for early access requests and examines the need for companies to develop a global strategy for GAPs in order to respond appropriately to requests for early access. It also provides a comprehensive overview of the processes for GAP set-up, implementation, management, and closure, along with the considerations affecting the type and scope of GAP, such as demand, regulatory feasibility, license status of the product, drug pricing structure, company strategy, costs, and product supply. Also discussed is the need for appropriate personnel to implement and manage the GAP, and when to consider collaboration with an external GAP provider. In summary, GAPs require careful and efficient planning and management, from set-up to closure. Well-run GAPs provide an ethical and regulatory-compliant pathway for access of new treatments to patients with serious conditions and an unmet medical need.

  5. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  6. Review and summary of Solar Thermal Conversion Program planning assistance

    Energy Technology Data Exchange (ETDEWEB)

    1975-06-01

    The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

  7. HTGR generic technology program plan (FY 80)

    International Nuclear Information System (INIS)

    1980-01-01

    Purpose of the program is to develop base technology and to perform design and development common to the HTGR Steam Cycle, Gas Turbine, and Process Heat Plants. The generic technology program breaks into the base technology, generic component, pebble-bed study, technology transfer, and fresh fuel programs

  8. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  9. The Circumpolar Biodiversity Monitoring Program Terrestrial Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    , understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity, and to identify knowledge gaps and priorities. This poster will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based monitoring...... and coastal environments. The CBMP Terrestrial Plan is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect...

  10. Characteristics of Effective Collaboration in Response to Diversified Transportation Planning Authority

    Directory of Open Access Journals (Sweden)

    John S. Miller

    2011-01-01

    Full Text Available Advantages of decentralized transportation planning responsibilities may include reduced project delivery cost, the integration of comprehensive long-range planning with regional land use, and greater accountability regarding local concerns. Yet disadvantages may include a tendency for operations to dominate longer-term planning, inconsistent operational standards, and difficulty in achieving network benefits, since some transportation links may provide benefits to the entire system but not to the immediate area where the link is located. To surmount these challenges in a decentralized environment, agencies need to cooperate effectively. Characteristics of effective collaboration include (1 experienced personnel, (2 credibility of the deciding entity, (3 transparency of decision-making processes, (4 an authority with sufficient power and/or funding to encourage implementation of key initiatives, (5 clear incentives for cooperation, and, of special importance given limited resources, and (6 an ability to evaluate tradeoffs. An access management case study demonstrates how agencies may use these characteristics to advance challenging projects in a decentralized environment.

  11. Light Water Reactor Sustainability Program: Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-05-01

    proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

  12. Collaborative development of Estonian nuclear master's program

    Energy Technology Data Exchange (ETDEWEB)

    Tkaczyk, A. H.; Kikas, A.; Realo, E.; Kirm, M.; Kiisk, M.; Isakar, K.; Suursoo, S.; Koch, R.; Feldbach, E.; Lushchik, A.; Reivelt, K. [Inst. of Physics, Univ. of Tartu, Riia 142, Tartu 51014 (Estonia)

    2012-07-01

    In 2009 Estonia approved the National Development Plan for the Energy Sector, including the nuclear energy option. This can be realized by construction of a nuclear power plant (NPP) in Estonia or by participation in neighboring nuclear projects (e.g., Lithuania and/or Finland). Either option requires the availability of competent personnel. It is necessary to prepare specialists with expertise in all aspects related to nuclear infrastructure and to meet workforce needs (e.g. energy enterprises, public agencies, municipalities). Estonia's leading institutions of higher education and research with the support of the European Social Fund have announced in this context a new nuclear master's curriculum to be developed. The language of instruction will be English. (authors)

  13. Light Water Reactor Sustainability Program Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    McCarthy, Kathryn A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Busby, Jeremy [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hallbert, Bruce [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis [Idaho National Lab. (INL), Idaho Falls, ID (United States); Barnard, Cathy [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  14. Light Water Reactor Sustainability Program Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  15. Adaptation Planning for the National Estuary Program

    Science.gov (United States)

    This document is a resource for coastal communities to start planning to adapt to climate change. It describes elements, such as vulnerability assessments and stakeholder outreach, and provides examples as well as suggestions for additional resources.

  16. Collaboration of the Dutch research program for radioactive waste disposal (OPERA) and TU Delft

    Energy Technology Data Exchange (ETDEWEB)

    Bykov, D.M.; Kloosterman, J.L. [TU Delft (Netherlands). Reactor Inst. Delft; Neeft, E.A.C.; Verhoef, E.V. [COVRA N.V., Nieuwdorp (Netherlands)

    2015-07-01

    Radioactive waste in the Netherlands is collected, treated and stored by COVRA (Centrale Organisatie Voor Radioactief Afval) in the interim storage facility for at least 100 a. After this period of long-term storage, geological disposal is foreseen. The policy is based on a step-wise decision process in which all decisions are taken to ensure safe disposal in a repository, but without excluding unforeseen alternative solutions that might develop in the future. OPERA is the Dutch acronym for research program into geological disposal of radioactive waste. It started in 2011 and is running for five years. The OPERA Research plan is developed by NRG in close collaboration with COVRA. Radioactive waste disposal in the Netherlands is at an early, conceptual phase. The aim of Opera is to develop a first preliminary safety case to structure the research necessary for the eventual deployment of a repository in the Netherlands. The OPERA research program aims at a close cooperation with the Belgian research program on radioactive waste disposal. The result of OPERA will be to detail a first roadmap for the long-term research on geological disposal of radioactive waste in the Netherlands, based initially on a re-evaluation of existing safety and feasibility studies conducted more than ten years ago, making use of present international and, wherever possible, national knowledge. This will be done by developing initial and conditional safety cases for generic GDFs in Zechstein rock salt and Boom Clay formations in the Netherlands. The goal in OPERA is to develop initial safety cases that are intended to mark the start of the research development process and to iterate these as knowledge grows to new developed insights. The safety case is conditional since plausible assumptions must later be confirmed in a safety case e.g. for site selection. Dutch, Belgian, German, English and French organizations participate in OPERA. These organizations can be found in the two documents with

  17. Collaboration of the Dutch research program for radioactive waste disposal (OPERA) and TU Delft

    International Nuclear Information System (INIS)

    Bykov, D.M.; Kloosterman, J.L.

    2015-01-01

    Radioactive waste in the Netherlands is collected, treated and stored by COVRA (Centrale Organisatie Voor Radioactief Afval) in the interim storage facility for at least 100 a. After this period of long-term storage, geological disposal is foreseen. The policy is based on a step-wise decision process in which all decisions are taken to ensure safe disposal in a repository, but without excluding unforeseen alternative solutions that might develop in the future. OPERA is the Dutch acronym for research program into geological disposal of radioactive waste. It started in 2011 and is running for five years. The OPERA Research plan is developed by NRG in close collaboration with COVRA. Radioactive waste disposal in the Netherlands is at an early, conceptual phase. The aim of Opera is to develop a first preliminary safety case to structure the research necessary for the eventual deployment of a repository in the Netherlands. The OPERA research program aims at a close cooperation with the Belgian research program on radioactive waste disposal. The result of OPERA will be to detail a first roadmap for the long-term research on geological disposal of radioactive waste in the Netherlands, based initially on a re-evaluation of existing safety and feasibility studies conducted more than ten years ago, making use of present international and, wherever possible, national knowledge. This will be done by developing initial and conditional safety cases for generic GDFs in Zechstein rock salt and Boom Clay formations in the Netherlands. The goal in OPERA is to develop initial safety cases that are intended to mark the start of the research development process and to iterate these as knowledge grows to new developed insights. The safety case is conditional since plausible assumptions must later be confirmed in a safety case e.g. for site selection. Dutch, Belgian, German, English and French organizations participate in OPERA. These organizations can be found in the two documents with

  18. Collaborative planning in natural resource management – the case of regulation of nitrogen in the agri-environment

    DEFF Research Database (Denmark)

    Vejre, Henrik; Andersen, Erling; Andersen, Peter Stubkjær

    approach is that local knowledge on, e.g. farming practices, soil, water and climate, can feed into the regulation process, making general rules less important, maybe even obsolete. Methods: The planning approach adapted for the study was inspired by concepts of collaborative planning in urban areas...... approaches are gaining momentum. The aim of this paper is to test a collaborative planning approach in the regulation of nitrogen in the farming sector. The overarching question is whether this regulation can be organised locally rather than by general, national rules. The benefits by adopting a local...... and various other concepts of participatory environmental planning. The approach was tested simultaneously in six case areas of rural Denmark, each comprising small watersheds (20-76km2). The strategic aim was to reduce the loss of nitrogen from farms to the aquatic environment. The planning process consisted...

  19. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  20. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  1. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  2. Collaborative work as a didactic strategy for teaching/learning programming: a systematic literature review

    Directory of Open Access Journals (Sweden)

    Oscar Revelo-Sanchez

    2018-01-01

    Full Text Available The incorporation of Collaborative Work into programming courses has been identified as a potential strategy that could maximize student participation and have a positive impact on learning. In the consulted sources, no study has been found to collect and analyze the results of research on this subject using a systematic method. To try to fill this gap, a systematic literature review was conducted with the aim of summarizing the studies on the use of Collaborative Work as a didactic strategy for teaching/learning programming. Initially, through a search in four (4 databases of scientific publications, 95 studies published in the last five (5 years were obtained. After careful analysis of each one of them, only 40 were found to meet the review requirements. This analysis resulted in the synthesis of eleven (11 Collaborative Learning Techniques (CLT that implement such strategy. Subsequently, they were grouped into 19 common names of strategies found in the documents, i.e. the collaborative strategies or techniques associated with each study. The review also showed a significant amount of contributions from the research community that constitute an important basis for future work. This demonstrates that Collaborative Work is increasingly consolidated as a valid and relevant didactic strategy, not only in programming teaching/learning, but also in other areas of knowledge including computer science.

  3. Case Study of Resilient Baton Rouge: Applying Depression Collaborative Care and Community Planning to Disaster Recovery

    Directory of Open Access Journals (Sweden)

    Robin Keegan

    2018-06-01

    Full Text Available Background: Addressing behavioral health impacts of major disasters is a priority of increasing national attention, but there are limited examples of implementation strategies to guide new disaster responses. We provide a case study of an effort being applied in response to the 2016 Great Flood in Baton Rouge. Methods: Resilient Baton Rouge was designed to support recovery after major flooding by building local capacity to implement an expanded model of depression collaborative care for adults, coupled with identifying and responding to local priorities and assets for recovery. For a descriptive, initial evaluation, we coupled analysis of documents and process notes with descriptive surveys of participants in initial training and orientation, including preliminary comparisons among licensed and non-licensed participants to identify training priorities. Results: We expanded local behavioral health service delivery capacity through subgrants to four agencies, provision of training tailored to licensed and non-licensed providers and development of advisory councils and partnerships with grassroots and government agencies. We also undertook initial efforts to enhance national collaboration around post-disaster resilience. Conclusion: Our partnered processes and lessons learned may be applicable to other communities that aim to promote resilience, as well as planning for and responding to post-disaster behavioral health needs.

  4. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  5. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  6. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  7. The circumpolar biodiversity monitoring program - Terrestrial plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    , northern communities, and scientists to detect, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity. This presentation will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based...... monitoring with survey-based monitoring and remotely sensed data. The CBMP Terrestrial Plan intends to build upon and expand existing monitoring networks, engaging participants across a range of capacity and interests. The presentation will summarize the recommended focal soil ecosystem components...... and attributes to monitor in the plan related to soil invertebrates. Focal Ecosystem Components (FECs) of the soil decomposer system include the soil living invertebrates such as microarthropods, enchytraeids and earthworms and the functions performed by microorganisms such as nitrification, decomposition...

  8. Salmon and Sagebrush: The Shoshone-Bannock Tribes Collaborative Approach to Adaptation Planning

    Science.gov (United States)

    Petersen, A.; Nasser, E.; Stone, D.; Krosby, M.; Whitley-Binder, L.; Morgan, H.; Rupp, D. E.; Dello, K.; Dalton, M. M.; Fox, M.; Rodgers, K.

    2017-12-01

    The Shoshone-Bannock Tribes reside in the Upper Snake River Watershed in southeast Idaho. Their lives and culture are intertwined with the lands where they live; lands which continue to sustain the Tribes cultural, spiritual, dietary and economic needs. Climate change presents a new threat to the region requiring innovative approaches to prepare for changes as well as to protect the natural resources within the region. As a critical first step in building climate resilience, the Tribes worked with Adaptation International, the University of Washington's Climate Impacts Group (CIG) and the Oregon Climate Change Research Institute (OCCRI) to complete a collaborative climate change vulnerability assessment and adaptation planning process. This presentation provides an overview of collaborative process, shares the results of the project, and includes a 3-minute video presentation. The project started with the identification of 34 plant and animal species to focus the vulnerability assessment. OCCRI analyzed detailed downscaled climate projections for two key climate scenarios (RCP 4.5 and RCP 8.5) and timescales (2050s and 2080s). CIG then used NatureServe's Climate Change Vulnerability Index (CCVI) to develop initial relative vulnerability results for these species. A core team of Tribal staff members from various departments refined these results, drawing upon and integrating rich local and traditional knowledges of the natural environmental and cultural resources. The adaptation planning phase of the project continued in a similar collaborative manner with the project team identifying promising adaptation actions and working directly with Tribal staff to refine and customize these strategies. Tailoring the actions to the local context provides a framework for action that the Tribes can continue to build on in the future. By engaging in these efforts to identify vulnerable species and adaptation strategies and actions to minimize the negative effects of climate

  9. Integrating Collaboration, Adaptive Management, and Scenario-Planning: Experiences at Las Cienegas National Conservation Area

    Directory of Open Access Journals (Sweden)

    Jeremy K. Caves

    2013-09-01

    Full Text Available There is growing recognition that public lands cannot be managed as islands; rather, land management must address the ecological, social, and temporal complexity that often spans jurisdictions and traditional planning horizons. Collaborative decision making and adaptive management (CAM have been promoted as methods to reconcile competing societal demands and respond to complex ecosystem dynamics. We detail the experiences of land managers and stakeholders in using CAM at Las Cienegas National Conservation Area (LCNCA, a highly valued site under the jurisdiction of the Bureau of Land Management (BLM. The CAM process at Las Cienegas is marked by strong stakeholder engagement, with four core elements: (1 shared watershed goals with measurable resource objectives; (2 relevant and reliable scientific information; (3 mechanisms to incorporate new information into decision making; and (4 shared learning to improve both the process and management actions. The combination of stakeholder engagement and adaptive management has led to agreement on contentious issues, more innovative solutions, and more effective land management. However, the region is now experiencing rapid changes outside managers' control, including climate change, human population growth, and reduced federal budgets, with large but unpredictable impacts on natural resources. Although the CAM experience provides a strong foundation for making the difficult and contentious management decisions that such changes are likely to require, neither collaboration nor adaptive management provides a sufficient structure for addressing the externalities that drive uncontrollable and unpredictable change. As a result, LCNCA is exploring two specific modifications to CAM that may better address emerging challenges, including: (1 creating nested resource objectives to distinguish between those objectives that may be crucial to maintaining ecological resilience from those that may hinder a flexible

  10. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  11. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  12. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  13. The Partnership in Teacher Excellence Program: A District-University Collaboration to Create Teacher Leaders

    Science.gov (United States)

    Bond, Nathan; Goodwin, Marilyn; Summers, Emily

    2013-01-01

    This article describes the conditions for establishing an advanced master's degree program that focuses on teacher leadership. The creation of the model is examined from the perspective of nine administrators from Eanes Independent School District in Austin, Texas, and Texas State University-San Marcos. These administrators collaborated to design…

  14. Body Talk: Examining a Collaborative Multiple-Visit Program for Visitors with Eating Disorders

    Science.gov (United States)

    Baddeley, Gwen; Evans, Laura; Lajeunesse, Marilyn; Legari, Stephen

    2017-01-01

    "Sharing the Douglas/Sharing the Museum," a collaboration program of the Montreal Museum of Fine Arts (MMFA), the Douglas Mental Health Institute and the Department of Creative Arts Therapies at Concordia University, serves patients from the Eating Disorder Unit of the Douglas. Participants eat lunch at the museum and look at, talk…

  15. A Formative Evaluation of Healthy Habits, Healthy U: A Collaborative School-Based Cancer Education Program

    Science.gov (United States)

    Anderson, Alicia; Spear, Caile; Pritchard, Mary; George, Kayla; Young, Kyle; Smith, Carrie

    2017-01-01

    Purpose: Healthy Habits, Healthy U (HHHU) is a two-day school-based primary prevention cancer education program that uses interactive classroom presentations designed to help students learn how to reduce their cancer risks. HHHU is a collaboration between a local cancer hospital, school district and university. HHHU incorporates real cancerous and…

  16. Space orbits of collaboration. [international cooperation and the U.S.S.R. space program

    Science.gov (United States)

    Petrov, B.

    1978-01-01

    The U.S.S.R. cooperative space efforts with other Socialist countries dating back to 1957 are reviewed. The Interkosmos program, which is divided into three series of satellites (solar, ionospheric and magnetospheric), is discussed as well as the Prognoz, Kosmos, Soyuz, and Molniya spacecraft. Collaboration with France, India, Sweden, and the United States is mentioned.

  17. Techniques for overcoming community resistance to family planning programs.

    Science.gov (United States)

    Palley, H A

    1968-01-01

    Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.

  18. Performance Demonstration Program Plan for the WIPP Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-02-01

    The Performance Demonstration Program is designed to ensure that compliance with the Quality Assurance Objective, identified in the Quality Assurance Program Plan for the WIPP Experimental-Waste Characterization Program (QAPP), is achieved. This Program Plan is intended for use by the WPO to assess the laboratory support provided for the characterization of WIPP TRU waste by the storage/generator sites. Phase 0 of the Performance Demonstration Program encompasses the analysis of headspace gas samples for inorganic and organic components. The WPO will ensure the implementation of this plan by designating an independent organization to coordinate and provide technical oversight for the program (Program Coordinator). Initial program support, regarding the technical oversight and coordination functions, shall be provided by the USEPA-ORP. This plan identifies the criteria that will be used for the evaluation of laboratory performance, the responsibilities of the Program Coordinator, and the responsibilities of the participating laboratories. 5 tabs

  19. Improving Collaborative Behaviour Planning in Adult Auditory Rehabilitation: Development of the I-PLAN Intervention Using the Behaviour Change Wheel.

    Science.gov (United States)

    Barker, Fiona; Lusignan, Simon de; Deborah, Cooke

    2018-05-18

    The consequences of poorly managed hearing loss can be ameliorated with hearing aid use but rates of use are sub-optimal. The impact of audiologist behaviour on subsequent use, particularly over the long term, is unknown. This study aimed to describe the role of the behaviour change wheel in developing an intervention to introduce and embed particular clinical behaviours into adult hearing aid fitting consultations, within the framework of the Medical Research Council guidance on complex interventions. Following the steps of the behaviour change wheel, audiologist behaviours that might influence hearing aid use were identified based on a systematic review and qualitative work with audiologists. An analysis, using the COM-B model, identified potential drivers of the target behaviours. This was used to select intervention functions and behaviour change techniques likely to influence behaviour in this context. The target behaviours were as follows: giving information about the benefits of hearing aid use and the negative consequences of non-use, providing prompts for use and engaging in collaborative behavioural planning for use. The behavioural analysis suggested that psychological capability, opportunity and motivation were potential drivers of these behaviours. The intervention functions of education, coercion, training, environmental restructuring, modelling and enablement were selected and combined to develop a single complex intervention that seeks to address the target behaviours.

  20. Transuranic Waste Characterization Quality Assurance Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  1. A Technological Teacher Education Program Planning Model.

    Science.gov (United States)

    Hansen, Ronald E.

    1993-01-01

    A model for technology teacher education curriculum has three facets: (1) purpose (experiential learning, personal development, technological enlightenment, economic well-being); (2) content (professional knowledge, curriculum development competence, pedagogical knowledge and skill, technological foundations); and (3) process (planned reflection,…

  2. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    1995-01-01

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  3. Next Generation Nuclear Plant Materials Research and Development Program Plan

    International Nuclear Information System (INIS)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-01-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R and D) Program is responsible for performing R and D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R and D Program includes the following elements: (1) Developing a specific approach, program plan and other project management

  4. Next Generation Nuclear Plant Materials Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for

  5. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  6. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Nowels, Larry; Veillette, Connie

    2006-01-01

    .... international family planning programs. In 1984, controversy arose over U.S. population aid policy when the Reagan Administration introduced restrictions, which became known as the "Mexico City policy...

  7. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Blanchfield, Luisa

    2008-01-01

    .... international family planning programs. In 1984, controversy arose over U.S. population aid policy when the Reagan Administration introduced restrictions, which became known as the "Mexico City policy...

  8. Large-scale linear programs in planning and prediction.

    Science.gov (United States)

    2017-06-01

    Large-scale linear programs are at the core of many traffic-related optimization problems in both planning and prediction. Moreover, many of these involve significant uncertainty, and hence are modeled using either chance constraints, or robust optim...

  9. STRATEGIC PLANNING AND PROGRAM BUDGETING IN ROMANIA – RECENT DEVELOPMENTS

    Directory of Open Access Journals (Sweden)

    D#259;nule#539;iu Dan-Constantin

    2009-05-01

    Full Text Available The paper emphasizes the efforts of Romanian authorities to implement program budgeting. Based on the first results, authorities decided to establish a link between strategic planning and budgeting, as a condition for implementing multi-annual budgeting.

  10. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  11. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  12. Plan for the large coil program

    International Nuclear Information System (INIS)

    Haubenreich, P.N.; Anderson, W.C.; Luton, J.N.; Thompson, P.B.

    1977-02-01

    This document has been prepared by the Large Coil Program (LCP) to make generally available the information that has been generated up to this point and to indicate the direction of future work. A summary of objectives, general strategy, and implementation of the LCP is given. Expanded descriptions are given of program content, technical requirements, selection of testing arrangements, tentative schedule and method of preliminary cost estimation

  13. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  14. Communications programs: Planning for the future

    International Nuclear Information System (INIS)

    D'Alessandro, J.S.

    1991-01-01

    In the past, the norm has been for developers and project managers to treat communications programs as a secondary, and thus less important, component of a project. Today, a communications program is one of the most important components of a project and communications personnel must be considered integral members of the project management team. The first step to facilitate the flow of information is to establish a presence in the affected community as soon as possible. Design a communications program that operates on several levels simultaneously. While the message should remain consistent, delivery mechanisms and packaging should be tailored to the particular audience. Realize that the communications program is as important to the success of the project as is its financing and engineering. Choose the right people to communicate the message; they must be believable. Never forget that the project is affecting the lives of real people and that it is real people you are attempting to communicate with. The final suggestion is to design the communications program so that it has as many avenues for input, both internally and externally, as it does for output. For any communications program to be truly effective, it must not merely communicate a message, but must also facilitate the establishment of positive relationships between the project and both its supporters and opponents

  15. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  16. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    Science.gov (United States)

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  17. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  18. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    Energy Technology Data Exchange (ETDEWEB)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  19. Training Program for Practical Engineering Design through the Collaboration with Regional Companies

    Science.gov (United States)

    Gofuku, Akio; Tabata, Nobuhisa; Tomita, Eiji; Funabiki, Nobuo

    An education program to bring up engineering design capabilities through long-term internship by the collaboration with regional companies has been put in practice for five years. The program is composed of two types of long-term internships and several lectures for patent systems and engineering ethics. This paper describes the outline of the program, educational effects, and our experiences. The program was improved into two educational programs in 2011. The one is a special course to educate engineers and scientists who can lead the technologies of their domains. The other is a long-term internship program for master students in engineering divisions of graduate school. This paper also describes the current activities of the latter program.

  20. Collaborative survey of perinatal loss in planned and unplanned home births. Northern Region Perinatal Mortality Survey Coordinating Group.

    OpenAIRE

    1996-01-01

    OBJECTIVE: To document the outcome of planned and unplanned births outside hospital. DESIGN: Confidential review of every pregnancy ending in stillbirth or neonatal death in which plans had been made for home delivery, irrespective of where delivery eventually occurred. The review was part of a sustained collaborative survey of all perinatal deaths. SETTING: Northern Regional Health Authority area. SUBJECTS: All 558,691 registered births to women normally resident in the former Northern Regio...

  1. Collaborating To Teach Prosocial Skills.

    Science.gov (United States)

    Allsopp, David H.; Santos, Karen E.; Linn, Reid

    2000-01-01

    This article describes a collaborative prosocial skills program. Steps of the intervention include forming teams of educators, targeting necessary prosocial skills, developing an instructional plan, determining the setting and collaborative roles, delivery instruction, and providing opportunities for student practice, reinforcement, and…

  2. OCWM Transportation Institutional Program Update on Collaborative Efforts with Key Stakeholders

    International Nuclear Information System (INIS)

    Saris, E.; Austin, P.; Offner, J.J.

    2004-01-01

    The Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) created the Office of National Transportation in 2003 recognizing the need to revitalize and accelerate development of the transportation system. The Department has made a commitment to work through a collaborative planning process before developing specific policies and procedures and making transportation decisions. OCRWM has begun to build the institutional framework to support development of this transportation system. Interactions with stakeholders have been initiated. The authors describe the key stakeholders, identified issues, regional and national planning activities, and mechanisms for interaction

  3. The US DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, K.D.; Han, A.M.; Marra, J.C.; Fox, K.M.; Peeler, D.K.; Smith, M.E.; Jannik, G.T.; Farfan, E.B.; Kim, D.S.; Vienna, J.D.; Roach, J.A.; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, C.W.

    2009-01-01

    monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination; and - Recommend the development and testing of effective cleanup technologies to reduce environmental and health risks. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the international program. A collaborative project with Russian Electrotechnical University is underway to evaluate Cold Crucible Induction Melter (CCIM) control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09. (authors)

  4. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  5. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  6. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  7. Sandia Dynamic Materials Program Strategic Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Flicker, Dawn Gustine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Benage, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Desjarlais, Michael P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knudson, Marcus D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Leifeste, Gordon T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lemke, Raymond W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mattsson, Thomas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wise, Jack L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    Materials in nuclear and conventional weapons can reach multi-megabar pressures and 1000s of degree temperatures on timescales ranging from microseconds to nanoseconds. Understanding the response of complex materials under these conditions is important for designing and assessing changes to nuclear weapons. In the next few decades, a major concern will be evaluating the behavior of aging materials and remanufactured components. The science to enable the program to underwrite decisions quickly and confidently on use, remanufacturing, and replacement of these materials will be critical to NNSA’s new Stockpile Responsiveness Program. Material response is also important for assessing the risks posed by adversaries or proliferants. Dynamic materials research, which refers to the use of high-speed experiments to produce extreme conditions in matter, is an important part of NNSA’s Stockpile Stewardship Program.

  8. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  9. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  10. Developing a collaborative community partnership program in medical asepsis with tattoo studios.

    Science.gov (United States)

    Bechtel, G A; Garrett, C; Grover, S

    1995-10-01

    The possibility of transmission of infectious agents during tattooing has become a legitimate issue of concern for health care providers. A collaborative educational program was developed by a county health department, College of Nursing, and tattoo artists to address issues of medical asepsis with the goal of producing a mechanism for certification of tattoo studios. The group's effort was enhanced by recognizing each other's value systems and by the mutual need for a successful program. A framework for developing, implementing, and evaluating community partnerships was addressed. This program demonstrated that community health nurses can play an instrumental role in collaborating with both health care providers and personal-service workers to minimize transmission of infectious agents during cosmetic procedures.

  11. A Semantic Web-Based Authoring Tool to Facilitate the Planning of Collaborative Learning Scenarios Compliant with Learning Theories

    Science.gov (United States)

    Isotani, Seiji; Mizoguchi, Riichiro; Isotani, Sadao; Capeli, Olimpio M.; Isotani, Naoko; de Albuquerque, Antonio R. P. L.; Bittencourt, Ig. I.; Jaques, Patricia

    2013-01-01

    When the goal of group activities is to support long-term learning, the task of designing well-thought-out collaborative learning (CL) scenarios is an important key to success. To help students adequately acquire and develop their knowledge and skills, a teacher can plan a scenario that increases the probability for learning to occur. Such a…

  12. Development of a web-based pharmaceutical care plan to facilitate collaboration between healthcare providers and patients

    NARCIS (Netherlands)

    Geurts, Marlies M E; Ivens, Martijn; van Gelder, Egbert; de Gier, Johan J

    2013-01-01

    BACKGROUND: In medication therapy management there is a need for a tool to document medication reviews and pharmaceutical care plans (PCPs) as well as facilitate collaboration and sharing of patient data between different healthcare providers. Currently, pharmacists and general practitioners (GPs)

  13. Data Driven Program Planning for GIS Instruction

    Science.gov (United States)

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  14. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  15. Planning Public Relations Programs for Exceptional Events.

    Science.gov (United States)

    McElreath, Mark P.

    This paper discusses Program Management (PM), a decision-making process which uses a diachronic, idea-generating communication mode. Decision making according to a PM model entails obtaining a mandate or authorization, identifying the problem, exploring for knowledge and generating solutions, reviewing proposals and developing resources,…

  16. Subseabed Disposal Program plan. Volume I. Overview

    International Nuclear Information System (INIS)

    1980-01-01

    Some of the most stable geologic formations are underneath the deep oceans. Purpose of this program is to assess the technical, environmental, and engineering feasibility of disposing of packaged high-level waste and/or repackaged spent reactor fuel in these formations

  17. The NASA computer science research program plan

    Science.gov (United States)

    1983-01-01

    A taxonomy of computer science is included, one state of the art of each of the major computer science categories is summarized. A functional breakdown of NASA programs under Aeronautics R and D, space R and T, and institutional support is also included. These areas were assessed against the computer science categories. Concurrent processing, highly reliable computing, and information management are identified.

  18. Quantitative release planning in extreme programming

    NARCIS (Netherlands)

    van Valkenhoef, Gert; Tervonen, Tommi; de Brock, Bert; Postmus, Douwe

    Context: Extreme Programming (XP) is one of the most popular agile software development methodologies. XP is defined as a consistent set of values and practices designed to work well together, but lacks practices for project management and especially for supporting the customer role. The customer

  19. Strategic Planning to Improve EHDI Programs

    Science.gov (United States)

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  20. Quantitative release planning in extreme programming

    NARCIS (Netherlands)

    van Valkenhoef, Gert; Tervonen, Tommi; de Brock, Bert; Postmus, Douwe

    2011-01-01

    Context: Extreme Programming (XP) is one of the most popular agile software development methodologies. XP is defined as a consistent set of values and practices designed to work well together, but lacks practices for project management and especially for supporting the customer role. The customer

  1. Nuclear program of Iran plans and development

    International Nuclear Information System (INIS)

    2016-01-01

    Described are the history of nuclear energy planning in Iran and the development of the Bushehr Nuclear Power Plant (BNPP-1) project and its impact on the competency building in national companies, nuclear safety infrastructure, training activities, public awareness and acceptance. The activities of Nuclear Engineering Department is also presented. In order to enhance technical support services to BNPP1 and also to use capabilities of other companies in the international arena and in line with safe and reliable operation of Bushehr Nuclear Power Plant, NPPD/TAVANA Company has attempted to make contact with many companies outside the country

  2. Subseabed Disposal Program Plan. Volume I. Overview

    International Nuclear Information System (INIS)

    1981-07-01

    The primary objective of the Subseabed Disposal Program (SDP) is to assess the scientific, environmental, and engineering feasibility of disposing of processed and packaged high-level nuclear waste in geologic formations beneath the world's oceans. High-level waste (HLW) is considered the most difficult of radioactive wastes to dispose of in oceanic geologic formations because of its heat and radiation output. From a scientific standpoint, the understanding developed for the disposal of such HLW can be used for other nuclear wastes (e.g., transuranic - TRU - or low-level) and materials from decommissioned facilities, since any set of barriers competent to contain the heat and radiation outputs of high-level waste will also contain such outputs from low-level waste. If subseabed disposal is found to be feasible for HLW, then other factors such as cost will become more important in considering subseabed emplacement for other nuclear wastes. A secondary objective of the SDP is to develop and maintain a capability to assess and cooperate with the seabed nuclear waste disposal programs of other nations. There are, of course, a number of nations with nuclear programs, and not all of these nations have convenient access to land-based repositories for nuclear waste. Many are attempting to develop legislative and scientific programs that will avoid potential hazards to man, threats to other ocean uses, and marine pollution, and they work together to such purpose in meetings of the international NEA/Seabed Working Group. The US SDP, as the first and most highly developed R and D program in the area, strongly influences the development of subseabed-disposal-related policy in such nations

  3. Course Length Versus Course Price: Marketing Factors in Program Planning.

    Science.gov (United States)

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  4. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  5. Planning for Program Design and Assessment Using Value Creation Frameworks

    Science.gov (United States)

    Whisler, Laurel; Anderson, Rachel; Brown, Jenai

    2017-01-01

    This article explains a program design and planning process using the Value Creation Framework (VCF) developed by Wenger, Trayner, and de Laat (2011). The framework involves identifying types of value or benefit for those involved in the program, conditions and activities that support creation of that value, data that measure whether the value was…

  6. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  7. Drunk Driving Public Information Program Strategies and Planning Guide.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  8. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  9. Fuels planning: science synthesis and integration; social issues fact sheet 11: Challenges to collaboration

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    Bringing the right people into a collaborative process can be difficult. Potential collaborators must all feel they have something to gain to justify investing resources, sharing knowledge, and perhaps compromising on goals and actions. This fact sheet discusses some of the common challenges that individuals, communities, and institutions face in collaboration.

  10. THE PROPOSED MODEL OF COLLABORATIVE VIRTUAL LEARNING ENVIRONMENT FOR INTRODUCTORY PROGRAMMING COURSE

    Directory of Open Access Journals (Sweden)

    Mahfudzah OTHMAN

    2012-01-01

    Full Text Available This paper discusses the proposed model of the collaborative virtual learning system for the introductory computer programming course which uses one of the collaborative learning techniques known as the “Think-Pair-Share”. The main objective of this study is to design a model for an online learning system that facilitates the collaborative learning activities in a virtual environment such as online communications and pair or small group discussions. In order to model the virtual learning environment, the RUP methodology has been used where it involves the data collection phase and the analysis and design phase. Fifty respondents have been randomly selected to participate in the data collection phase to investigate the students’ interest and learning styles as well as their learning preferences. The results have shown the needs for the development of online small group discussions that can be used as an alternative learning style for programming courses. The proposed design of the virtual learning system named as the Online Collaborative Learning System or OCLS is being depicted using the object-oriented models which are the use-case model and class diagram in order to show the concise processes of virtual “Think-Pair-Share” collaborative activities. The “Think-Pair-Share” collaborative learning technique that is being used in this model has been chosen because of its simplicity and relatively low-risk. This paper also presents the proposed model of the system’s architecture that will become the guidelines for the physical development of OCLS using the web-based applications.

  11. Nuclear weapons modernization: Plans, programs, and issues for Congress

    Science.gov (United States)

    Woolf, Amy F.

    2017-11-01

    The United States is currently recapitalizing each delivery system in its "nuclear triad" and refurbishing many of the warheads carried by those systems. The plans for these modernization programs have raised a number of questions, both within Congress and among analysts in the nuclear weapons and arms control communities, about the costs associated with the programs and the need to recapitalize each leg of the triad at the same time. This paper covers four distinct issues. It begins with a brief review of the planned modernization programs, then addresses questions about why the United States is pursuing all of these modernization programs at this time. It then reviews the debate about how much these modernization programs are likely to cost in the next decade and considers possible changes that might reduce the cost. It concludes with some comments about congressional views on the modernization programs and prospects for continuing congressional support in the coming years.

  12. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  13. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  14. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  15. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  16. Tank farm waste characterization Technology Program Plan

    International Nuclear Information System (INIS)

    Hohl, T.M.; Schull, K.E.; Bensky, M.S.; Sasaki, L.M.

    1989-03-01

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved

  17. 76 FR 5774 - Planning and Establishment of Consumer Operated and Oriented Plan Program; Request for Comments...

    Science.gov (United States)

    2011-02-02

    ...) of the Affordable Care Act directs the Secretary to establish a program to foster, through grants and... in feasibility studies, business plans, and marketing plans provided by prospective applicants before... are the advantages and disadvantages of a regional qualified nonprofit issuer or a regional federation...

  18. Research program plan: reactor vessels. Volume 1

    International Nuclear Information System (INIS)

    Vagins, M.; Taboada, A.

    1985-07-01

    The ability of the licensing staff of the NRC to make decisions concerning the present and continuing safety of nuclear reactor pressure vessels under both normal and abnormal operating conditions is dependent upon the existence of verified analysis methods and a solid background of applicable experimental data. It is the role of this program to provide both the analytical methods and the experimental data needed. Specifically, this program develops fracture mechanics analysis methods and design criteria for predicting the stress levels and flaw sizes required for crack initiation, propagation, and arrest in LWR pressure vessels under all known and postulated operations conditions. To do this, not only must the methods be developed but they must be experimentally validated. Further, the materials data necessary for input to these analytical methods must be developed. Thus, in addition to methods development and large scale experimental verification this program also develops data to show that slow-load fracture toughness, rapid-load fracture toughness, and crack arrest toughness obtained from small laboratory specimens are truly representative of the toughness characteristics of the material behavior in pressure vessels in both the unirradiated and the irradiated conditions

  19. Selenide isotope generator for the Galileo mission. Reliability program plan

    International Nuclear Information System (INIS)

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work

  20. Interdisciplinary collaboration between social workers and dieticians in nutrition education programs for children-at-risk.

    Science.gov (United States)

    Shor, Ron

    2010-01-01

    Bio-psycho-social risk factors may lead to situations of poor nutrition of children. However, despite the multiple risk factors involved in such situations, interdisciplinary collaboration between experts in the psycho-social dimensions and experts in the bio-dimension of poor nutrition has not been a common model of practice. An evaluation was conducted in Israel of the experience of collaboration between social workers and dieticians in leading nutrition-education programs. A qualitative methodology was implemented with 22 participants. The findings illuminate the potential that interdisciplinary collaboration has to enhance the response of each of the professions to the risks for poor nutrition. The barriers affecting collaboration are: (a) role ambiguity about the non-administrative functions of social workers; (b) the dieticians' lack of sufficient familiarity with the life circumstances of low-income families and how to adjust the nutrition-related contents to their circumstances; and (c) difficulties to achieve a balance between the structured methods of knowledge delivery of the dieticians and the less structured methods of intervention of social workers. The findings illuminate the significance of incorporating suitable approaches into the collaboration for reducing these barriers.

  1. Tanks focus area multiyear program plan - FY96-FY98

    International Nuclear Information System (INIS)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary

  2. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    Science.gov (United States)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    an extensive participatory process. A series of meetings were organised, first, to raise awareness of local managers on the information provided by flood maps and on the objectives of the Directive towards integrated water management. Second, these successive meetings and the use of decision support tools such as a multicriteria analysis matrix allowed the team to collect local information on risks and opportunities, to foster emergence of integrated solutions, and to reach an agreement on priorities at the catchment scale and then at the regional level. This case study provides insights on practicability of using hydrological data on flood hazard in a collaborative, bottom-up approach to flood risk management. Lessons learnt from this project are a foundation for a realistic and effective management plan but limitations of the method and time constrains of this project leave a number of questions as to follow-up, exhaustiveness and cost-effectiveness of measures constituting the plan.

  3. Programming PLCS under EPICS at the SNS Project : Further Experiences in Collaboration

    International Nuclear Information System (INIS)

    P. A. Gurd; W. H. Strong; J. D. Creel

    2003-01-01

    The Spallation Neutron Source (SNS) is an accelerator-based neutron source being built in Tennessee by a partnership of six national laboratories. The control system components for the SNS were produced by personnel at the collaborating laboratories, by vendors of the equipment, and by commercial contractors. A number of different approaches were used to provide the programming for both the programmable logic controllers (PLCs) and the input-output controllers (IOCs) which were all based on the Experimental Physics and Industrial Control System (EPICS). For conventional facilities, both the PLCs and the IOCs were programmed under a commercial contract. The PLCs for the high power radio frequency system (HPRF) were programmed by the vendors of the equipment, while the IOCs were programmed by the collaborating laboratory. Finally, while the IOCs for the cryogenic systems were programmed at Oak Ridge, three different approaches were used to produce the PLC programming: some were programmed at Oak Ridge, some at TJNAF, and some at vendor sites. This paper discusses the status of the PLCs in the control system and the integration challenges encountered in the various approaches

  4. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  5. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  6. Evaluating the strategic capacity of collaborative spatial planning initiatives by the performance of its process, output and outcomes : The case of the southern Randstad Holland

    NARCIS (Netherlands)

    Harteveld, E.; Waterhout, B.; Broekhans, B.; Zonneveld, W.A.M.

    2015-01-01

    Spatial planning practices are constantly evolving to be more effective in a dynamic context. In the face of the latest developments, the practice of collaborative spatial planning through the formation of regional collaborations has emerged as the contemporary solution. The practice of working with

  7. United State space programs - Present and planned

    Science.gov (United States)

    Frosch, R. A.

    1978-01-01

    The U.S. space program is considered with reference to the benefits derived by the public. Missions are divided into three categories: the use of near-earth space for remote sensing, communications, and other purposes directly beneficial to human welfare; the scientific exploration of the solar system and observation of the universe as part of the continuing effort to understand the place of earth and man in the cosmos; and the investigation of the sun-earth relationships which are basic to the terrestrial biosphere. Individual projects are described, and it is suggested that the future of space technology in 1978 is comparable to the future of aviation in 1924.

  8. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    International Nuclear Information System (INIS)

    MORGAN, LK

    2002-01-01

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  9. Urban Gardening and Green Space Governance: Towards New Collaborative Planning Practices

    Directory of Open Access Journals (Sweden)

    Sofia Nikolaidou

    2016-02-01

    Full Text Available In the context of urban densification and central urban areas’ lack of open spaces, new forms of small-scale urban gardening practices have emerged. These gardening practices respond to urban pressures and open new modes of green space governance, presenting alternative and multifunctional ways to manage and revitalise cities. Focusing on the case of Geneva, the article unfolds two levels of discussion. On the one hand—and with reference to the theorist Habermas—it examines how multiple actors with different interests interplay and cooperate with each other in order to negotiate over open space, while discussing implications for local politics and planning. On the other hand, it describes how these negotiations result in new, innovative, and hybrid forms of public green space. The main findings indicate emerging forms of collaboration, partnerships, and governance patterns that involve public and private sectors and increase participation by civil society actors. Cooperation amongst several interested groups and the collective re-invention of public urban spaces increase these spaces’ accessibility for multiple users and actors, as well as present possibilities for alternative and diversified uses and activities. This might underline the hypothesis that future cities will be governed in less formalised ways, and that urban forms will be created through spontaneous, temporary, mobile, and adaptive negotiation processes.

  10. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan

  11. CSSP implementation plan for space plasma physics programs

    International Nuclear Information System (INIS)

    Baker, D.N.; Williams, D.J.; Johns Hopkins Univ., Laurel, MD)

    1985-01-01

    The Committee on Solar and Space Physics (CSSP) has provided NASA with guidance in the areas of solar, heliospheric, magnetospheric, and upper atmospheric research. The budgetary sitation confronted by NASA has called for a prioritized plane for the implementation of solar and space plasma physics programs. CSSP has developed the following recommendations: (1) continue implementation of both the Upper Atmosphere Research Satellite and Solar Optical Telescope programs; (2) initiate the International Solar Terrestrial Physics program; (3) plan for later major free-flying missions and carry out the technology development they require; (4) launch an average of one solar and space physics Explorer per yr beginning in 1990; (5) enhance current Shuttle/Spacelab programs; (6) develop facility-class instrumentation; (7) augment the solar terrestrial theory program by FY 1990; (8) support a compute modeling program; (9) strengthen the research and analysis program; and (10) maintain a stable suborbital program for flexible science objectives in upper atmosphere and space plasma physics

  12. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  13. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  14. Constance mirror program: progress and plans

    International Nuclear Information System (INIS)

    Klinkowstein, R.E.; Mauel, M.E.; Irby, J.; Smullin, L.D.; Voldman, S.

    1981-01-01

    The basic construction of the Constance II experiment was completed during August of 1979 with the installation of the first set of Ioffe bars. Since then, several improvements have been made and several experimental investigations have been completed. These are: (1) the improved, liquid-nitrogen cooled, Ioffe bars have been constructed and installed, (2) a diverter coil was installed between the guide and mirror field region, (3) the 100 kW ICRF generator have been constructed and tested, (4) the data acquisition system has been completed, (5) confinement studies have determined the optimum hot-ion operation of the machine with Titanium and pulsed-gas plasma guns, (6) the density, temperature, and radius of the plasma have been measured, (7) ion-cyclotron fluctuations have been observed, their bandwidth measured, and the conditions for its appearance investigated, and (8) preliminary ECRH data have been collected demonstrating resonance heating. In addition, development of the diagnostics has continued. For example, new x-ray diagnostics have been designed and purchased, and progress on the Thomson scattering has been made. Finally, a new hot cathode gun, which will soon be tested, has been designed and constructed. This report discusses the current state of the mechanics of the Constance II experiment as well as the physics results that have been gathered to date. In addition, the motivation, background, and future plans for the Constance II experiment will be reviewed

  15. Task Allocation and Path Planning for Collaborative Autonomous Underwater Vehicles Operating through an Underwater Acoustic Network

    Directory of Open Access Journals (Sweden)

    Yueyue Deng

    2013-01-01

    Full Text Available Dynamic and unstructured multiple cooperative autonomous underwater vehicle (AUV missions are highly complex operations, and task allocation and path planning are made significantly more challenging under realistic underwater acoustic communication constraints. This paper presents a solution for the task allocation and path planning for multiple AUVs under marginal acoustic communication conditions: a location-aided task allocation framework (LAAF algorithm for multitarget task assignment and the grid-based multiobjective optimal programming (GMOOP mathematical model for finding an optimal vehicle command decision given a set of objectives and constraints. Both the LAAF and GMOOP algorithms are well suited in poor acoustic network condition and dynamic environment. Our research is based on an existing mobile ad hoc network underwater acoustic simulator and blind flooding routing protocol. Simulation results demonstrate that the location-aided auction strategy performs significantly better than the well-accepted auction algorithm developed by Bertsekas in terms of task-allocation time and network bandwidth consumption. We also demonstrate that the GMOOP path-planning technique provides an efficient method for executing multiobjective tasks by cooperative agents with limited communication capabilities. This is in contrast to existing multiobjective action selection methods that are limited to networks where constant, reliable communication is assumed to be available.

  16. Materials program plan for inertial confinement fusion

    International Nuclear Information System (INIS)

    Garde, A.; Hall, B.O.; Harkness, S.D.; Maiya, P.S.; Rechtin, M.D.; Li, C.Y.

    1979-08-01

    The effect of the irradiation environment on the microstructure of materials is studied. A major part of the initial activity in this area will be aimed toward evaluating the importance of pulse effects on microstructural development. The development effort that is necessary to cope with the high cycle loading of the first wall structure is studied. The loading pulses are expected to range from 1 to 20 per second (3 x 10 7 to 6 x 10 8 /year), thus creating a high cycle fatigue problem for any long-lived first wall structure. The interrelationship between specimen and component testing is a major issue in this section. Static mechanical property requirements are also considered here. Lithium compatibility is treated. The final section integrates the conclusions reached in the body of the report into a unified strategy that suggests a particular effort level to support major program milestones

  17. Materials program plan for inertial confinement fusion

    Energy Technology Data Exchange (ETDEWEB)

    Garde, A.; Hall, B.O.; Harkness, S.D.; Maiya, P.S.; Rechtin, M.D.; Li, C.Y.

    1979-08-01

    The effect of the irradiation environment on the microstructure of materials is studied. A major part of the initial activity in this area will be aimed toward evaluating the importance of pulse effects on microstructural development. The development effort that is necessary to cope with the high cycle loading of the first wall structure is studied. The loading pulses are expected to range from 1 to 20 per second (3 x 10/sup 7/ to 6 x 10/sup 8//year), thus creating a high cycle fatigue problem for any long-lived first wall structure. The interrelationship between specimen and component testing is a major issue in this section. Static mechanical property requirements are also considered here. Lithium compatibility is treated. The final section integrates the conclusions reached in the body of the report into a unified strategy that suggests a particular effort level to support major program milestones.

  18. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  19. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  20. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  1. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  2. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  3. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  4. A collaborative community-based treatment program for offenders with mental illness.

    Science.gov (United States)

    Roskes, E; Feldman, R

    1999-12-01

    The paper describes initial results of collaboration between a mental health treatment program at a community mental health center in Baltimore and a probation officer of the U.S. federal prison system to serve the mental health needs of offenders on federal probation, parole, supervised release, or conditional release in the community. A forensic psychiatrist in the treatment program and a licensed social worker in the probation office facilitate the close working relationship between the agencies. Treatment services provided or brokered by the community mental health center staff include psychiatric and medical treatment, intensive case management, addictions treatment, urine toxicology screening, psychosocial or residential rehabilitation services, intensive outpatient care, partial hospitalization, and inpatient treatment. Among the 16 offenders referred for treatment during the first 24 months of the collaborative program, 14 were male and 14 were African American. Three of the 16 violated the terms of their release due to noncompliance with stipulated mental health treatment; only one of the three had been successfully engaged in treatment. One patient died, two completed their terms of supervision, and ten remained in treatment at the time of the report. The major strength of this collaboration is the cooperation of the treatment and monitoring agencies with the overall goal of maintaining the offender in the community. Further research is needed to confirm the effectiveness of the clinical model in reducing recidivism and retaining clients.

  5. France-Japan collaboration on the severe accident studies for ASTRID. Outcomes and future work program

    International Nuclear Information System (INIS)

    Serre, F.; Bertrand, F.; Bachrata, A.; Marie, N.; Kubo, Shigenobu; Kamiyama, Kenji; Carluec, B.; Farges, B.; Koyama, K.

    2017-01-01

    The ASTRID reactor (Advanced Sodium Technological Reactor for Industrial Demonstration) is a technological demonstrator of GenIV sodium-cooled fast reactor (SFR) designed by the CEA with its industrial partners, with very high levels of requirements. In the ASTRID project, the safety objectives are first to prevent the core melting, in particular by the development of an innovative core (named CFV core) with low void worth and complementary safety prevention devices, and second, to enhance the reactor resistance to severe accidents by design. In order to mitigate the consequences of hypothetical core melting situations, specific provisions (mitigation devices) are added to the core and to the reactor. To meet these ASTRID objectives, a large R and D program was launched in the Severe Accident domain by the CEA, with collaboration of AREVA NP, JAEA, MFBR and MHI organizations, in the frame of the France-Japan ASTRID and SFRs collaboration agreement. This R and D program covers exchanges on severe accident conditions to be studied for the SFR safety cases, the methodology to study these situations, ASTRID severe accident simulations, the comparison and understanding of the ASTRID and JSFR reactor behavior under these situations, the development and adaptation of simulation tools, and, despite an already large existing experimental database, a complementary experimental program to improve the knowledge and reduce the uncertainties. This paper will present the collaboration work performed on the Severe Accidents studies. (author)

  6. The Effect of a Collaborative Mentoring Program on Beginning Science Teachers' Inquiry-based Teaching Practice

    Science.gov (United States)

    Nam, Jeonghee; Seung, Eulsun; Go, MunSuk

    2013-03-01

    This study investigated how a collaborative mentoring program influenced beginning science teachers' inquiry-based teaching and their reflection on practice. The one-year program consisted of five one-on-one mentoring meetings, weekly science education seminars, weekly mentoring group discussions, and self-evaluation activities. The participants were three beginning science teachers and three mentors at the middle school level (7-9th grades) in an urban area of South Korea. For each beginning teacher, five lessons were evaluated in terms of lesson design/implementation, procedural knowledge, and classroom culture by using the Reformed Teaching Observation Protocol. Five aspects of the beginning teachers' reflections were identified. This study showed that a collaborative mentoring program focusing on inquiry-based science teaching encouraged the beginning teachers to reflect on their own perceptions and teaching practice in terms of inquiry-based science teaching, which led to changes in their teaching practice. This study also highlighted the importance of collaborative interactions between the mentors and the beginning teachers during the mentoring process.

  7. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    Science.gov (United States)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  8. Shared visions, future challenges: a case study of three Collaborative Forest Landscape Restoration Program locations

    Directory of Open Access Journals (Sweden)

    Emily H. Walpole

    2017-06-01

    Full Text Available The USDA Forest Service is encouraging the restoration of select forest ecosystems through its Collaborative Forest Landscape Restoration Program (CFLRP. Collaboration is often necessary to implement landscape-scale management projects such as these, and a substantial body of research has examined the benefits and limitations of using collaboration as a tool for improving relationships, trust, and other outcomes among stakeholder groups. However, limited research has investigated the use of collaboration to achieve large-scale ecological restoration goals. Restoration poses some unique conditions for a collaborative approach, including reaching agreement on which historic conditions to use as a reference point, the degree of departure from these reference conditions that warrants management intervention, and how to balance historic conditions with expected future conditions and current human uses of the landscape. Using a mental-models approach, semistructured interviews were conducted with a total of 25 participants at three CFLRP sites. Results indicate that collaboration contributed to improved relationships and trust among participants, even among stakeholder groups with a history of disagreement over management goals. In addition, a shared focus on improving ecosystem resilience helped groups to address controversial management topics such as forest thinning in some areas. However, there was also evidence that CFLRP partnerships in our study locations have primarily focused on areas of high agreement among their stakeholders to date, and have not yet addressed other contentious topics. Previous studies suggest that first conducting management in areas with high consensus among participating stakeholders can build relationships and advance long-term goals. Nonetheless, our results indicate that achieving compromise in less obviously departed systems will require more explicit value-based discussions among stakeholders.

  9. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  10. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  11. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  12. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  13. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  14. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  15. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  16. Collaborative Aerospace Research and Fellowship Program at NASA Glenn Research Center

    Science.gov (United States)

    Heyward, Ann O.; Kankam, Mark D.

    2004-01-01

    During the summer of 2004, a 10-week activity for university faculty entitled the NASA-OAI Collaborative Aerospace Research and Fellowship Program (CFP) was conducted at the NASA Glenn Research Center in collaboration with the Ohio Aerospace Institute (OAI). This is a companion program to the highly successful NASA Faculty Fellowship Program and its predecessor, the NASA-ASEE Summer Faculty Fellowship Program that operated for 38 years at Glenn. The objectives of CFP parallel those of its companion, viz., (1) to further the professional knowledge of qualified engineering and science faculty,(2) to stimulate an exchange of ideas between teaching participants and employees of NASA, (3) to enrich and refresh the research and teaching activities of participants institutions, and (4) to contribute to the research objectives of Glenn. However, CFP, unlike the NASA program, permits faculty to be in residence for more than two summers and does not limit participation to United States citizens. Selected fellows spend 10 weeks at Glenn working on research problems in collaboration with NASA colleagues and participating in related activities of the NASA-ASEE program. This year's program began officially on June 1, 2004 and continued through August 7, 2004. Several fellows had program dates that differed from the official dates because university schedules vary and because some of the summer research projects warranted a time extension beyond the 10 weeks for satisfactory completion of the work. The stipend paid to the fellows was $1200 per week and a relocation allowance of $1000 was paid to those living outside a 50-mile radius of the Center. In post-program surveys from this and previous years, the faculty cited numerous instances where participation in the program has led to new courses, new research projects, new laboratory experiments, and grants from NASA to continue the work initiated during the summer. Many of the fellows mentioned amplifying material, both in

  17. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  18. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  19. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  20. Students' online collaborative intention for group projects: Evidence from an extended version of the theory of planned behaviour.

    Science.gov (United States)

    Cheng, Eddie W L; Chu, Samuel K W

    2016-08-01

    Given the increasing use of web technology for teaching and learning, this study developed and examined an extended version of the theory of planned behaviour (TPB) model, which explained students' intention to collaborate online for their group projects. Results indicated that past experience predicted the three antecedents of intention, while past behaviour was predictive of subjective norm and perceived behavioural control. Moreover, the three antecedents (attitude towards e-collaboration, subjective norm and perceived behavioural control) were found to significantly predict e-collaborative intention. This study explored the use of the "remember" type of awareness (i.e. past experience) and evaluated the value of the "know" type of awareness (i.e. past behaviour) in the TPB model. © 2015 International Union of Psychological Science.

  1. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  2. Global health education programming as a model for inter-institutional collaboration in interprofessional health education.

    Science.gov (United States)

    Peluso, Michael J; Hafler, Janet P; Sipsma, Heather; Cherlin, Emily

    2014-07-01

    While global health (GH) opportunities have expanded at schools of medicine, nursing, and public health, few examples of interprofessional approaches to GH education have been described. The elective GH program at our university serves as an important opportunity for high-quality interprofessional education. We undertook a qualitative study to examine the experience of student, faculty and administrative leaders of the program. We used content analysis to code responses and analyze data. Among the leadership, key themes fell within the categories of interprofessional education, student-faculty collaboration, professional development, and practical considerations for the development of such programs. The principles described could be considered by institutions seeking to develop meaningful partnerships in an effort to develop or refine interprofessional global health education programs.

  3. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  4. NASA's Spaceflight Visual Impairment and Intracranial Hypertension Research Plan: An accelerated Research Collaboration

    Science.gov (United States)

    Otto, Christian; Fogarty, J.; Grounds, D.; Davis, J.

    2010-01-01

    To date six long duration astronauts have experienced in flight visual changes and post flight signs of optic disc edema, globe flattening, choroidal folds, hyperoptic shifts and or raised intracranial pressure. In some cases the changes were transient while in others they are persistent with varying degrees of visual impairment. Given that all astronauts exposed to microgravity experience a cephalad fluid shift, and that both symptomatic and asymptomatic patients have exhibited optic nerve sheath edema on MRI, there is a high probability that all astronauts develop in-flight idiopathic intracranial hypertension to some degree. Those who are susceptible, have an increased likelihood of developing treatment resistant papilledema resulting in visual impairment and possible long-term vision loss. Such an acquired disability would have a profound mission impact and would be detrimental to the long term health of the astronaut. The visual impairment and increased intracranial pressure phenomenon appears to have multiple contributing factors. Consequently, the working "physiological fault bush" with elevated intracranial pressure at its center, is divided into ocular effects, and CNS and other effects. Some of these variables have been documented and or measured through operational data gathering, while others are unknown, undocumented and or hypothetical. Both the complexity of the problem and the urgency to find a solution require that a unique, non-traditional research model be employed such as the Accelerated Research Collaboration(TM) (ARC) model that has been pioneered by the Myelin Repair Foundation. In the ARC model a single entity facilitates and manages all aspects of the basic, translational, and clinical research, providing expert oversight for both scientific and managerial efforts. The result is a comprehensive research plan executed by a multidisciplinary team and the elimination of stove-piped research. The ARC model emphasizes efficient and effective

  5. Psoriasis in those planning a family, pregnant or breast-feeding. The Australasian Psoriasis Collaboration.

    Science.gov (United States)

    Rademaker, Marius; Agnew, Karen; Andrews, Megan; Armour, Katherine; Baker, Chris; Foley, Peter; Frew, John; Gebauer, Kurt; Gupta, Monisha; Kennedy, Debra; Marshman, Gillian; Sullivan, John

    2017-05-23

    The Australasian Psoriasis Collaboration has reviewed the evidence for managing moderate to severe psoriasis in those who are pregnant or are breast-feeding, or planning a family. The severity of the psoriasis, associated comorbidities and specific anti-psoriasis treatment, along with other exposures, can have a deleterious effect on pregnancy outcomes. Psoriasis itself increases the risk of preterm and low birthweight babies, along with spontaneous and induced abortions, but no specific birth defects have been otherwise demonstrated. The baseline risk for a live born baby to have a major birth defect is 3%, and significant neuro-developmental problem is 5%. In Australia, pregnant women with psoriasis are more likely to be overweight or obese, depressed, or smoke in their first trimester, and are also less likely to take prenatal vitamins or supplements. Preconception counselling to improve maternal, pregnancy and baby health is therefore strongly encouraged. The topical and systemic therapies commonly used in psoriasis are each discussed separately, with regards to pregnancy exposure, breast-feeding and effects on male fertility and mutagenicity. The systemic therapies included are acitretin, adalimumab, apremilast, certolizumab, ciclosporin, etanercept, infliximab, ixekizumab, methotrexate, NBUVB, prednisone, PUVA, secukinumab and ustekinumab. The topical therapies include dithranol (anthralin), calcipotriol, coal tar, corticosteroids (weak, potent and super-potent), moisturisers, salicylic acid, tacrolimus, and tazarotene. As a general recommendation, effective drugs that have been widely used for years are preferable to newer alternatives with less foetal safety data. It is equally important to evaluate the risks of not treating, as severe untreated disease may negatively impact both mother and the foetus. © 2017 The Australasian College of Dermatologists.

  6. Evaluating the strategic capacity of collaborative spatial planning initiatives by the performance of its process, output and outcomes: The case of the southern Randstad Holland

    OpenAIRE

    Harteveld, E.; Waterhout, B.; Broekhans, B.; Zonneveld, W.A.M.

    2015-01-01

    Spatial planning practices are constantly evolving to be more effective in a dynamic context. In the face of the latest developments, the practice of collaborative spatial planning through the formation of regional collaborations has emerged as the contemporary solution. The practice of working with a multitude of public actors that cooperate to formulate spatial strategies for issues that transcend their own planning capacity is relatively new and the ideal structure, organization and scope ...

  7. Are men well served by family planning programs?

    OpenAIRE

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-01

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of progra...

  8. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  9. Institutional Framework for Collaborative Urban Planning in Afghanistan in view of the Transferring Process of International Urban Planning Systems

    OpenAIRE

    Habib Ahmad Javid; Tetsuo Kidokoro

    2015-01-01

    This article provides an overview of Afghanistan’s urban planning institutional change in certain historical periods, particular dilemmas within the current urban planning system and its gradual shift from totalitarian urban planning approaches practiced during 1960s - 1980s to a different form of planning being practiced by the current government. In addition, it will seek to analyze the ease and tension caused by the three recent phenomena that have emerged after the establishment of a new ...

  10. Fuels planning: science synthesis and integration; social issues fact sheet 10: Stages of collaboration

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    Collaboration is a powerful tool for improving both the management of wildland fire and the overall health of forests and other elements of fire-dependent ecosystems. This fact sheet discusses seven stages that are typical of most collaborations.Other publications in this...

  11. Fuels planning: science synthesis and integration; social issues fact sheet 12: Keys to successful collaboration

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    Collaborating on fire and fuels management with a host of public and private partners may seem like an impossible undertaking, and presents many challenges. This fact sheet reviews tips for what to focus on as you embark on a collaborative fuels management project.Other...

  12. Fuels planning: science synthesis and integration; social issues fact sheet 09: Benefits of collaboration

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    Wildland fire professionals at the Federal, State, and local levels have a long tradition of collaborating across agencies and jurisdictions to achieve goals that they could not achieve independently. This fact sheet discusses the reasons and resources for collaboration.Other...

  13. Seismic safety margin research program. Program plan, Revision II

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.; Johnson, J.J.; Dong, R.G.

    1978-01-01

    The document has been prepared pursuant to the second meeting of the Senior Research Review Group of the Seismic Safety Margin Research Program (SSMRP), which was held on June 15, 16, 1978. The major portion of the material contained in the document is descriptions of specific subtasks to be performed on the SSMRP. This is preceded by a brief discussion of the objective of the SSMRP and the approach to be used. Specific subtasks to be performed in Phase I of the SSMRP are as follows: (1) plant/site selection, (2) seismic input, (3) soil structure interaction, (4) structural building response, (5) structural sub-system response, (6) fragility, (7) system analysis, and (8) Phase II task definition

  14. Distributed and collaborative: Experiences of local leadership of a first-year experience program

    Directory of Open Access Journals (Sweden)

    Jo McKenzie

    2017-07-01

    Full Text Available Local level leadership of the first year experience (FYE is critical for engaging academic and professional staff in working collaboratively on a whole of institution focus on student transition and success. This paper describes ways in which local informal leadership is experienced at faculty level in an institutional FYE program, based on interviews with faculty coordinators and small grant recipients. Initial analysis using the distributed leadership tenets described by Jones, Hadgraft, Harvey, Lefoe, and Ryland (2014 revealed features that enabled success, such as collaborative communities, as well as faculty differences influenced by the strength of the external mandate for change in the FYE. More fine-grained analysis indicated further themes in engaging others, enabling and enacting the FYE program that fostered internal mandates for change: gaining buy-in; being opportunistic; making use of evidence of success and recognition; along with the need for collegial support for coordinators and self-perceptions of leadership being about making connections, collaboration, trust and expertise.

  15. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  16. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  17. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  18. Are men well served by family planning programs?

    Science.gov (United States)

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-23

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of programming shows that men and boys are not particularly well served by programs. Most programs operate from the perspective that women are contraceptive users and that men should support their partners, with insufficient attention to reaching men as contraceptive users in their own right. The notion that family planning is women's business only is outdated. There is sufficient evidence demonstrating men's desire for information and services, as well as men's positive response to existing programming to warrant further programming for men as FP users. The key considerations focus on getting information and services where men and boys need it; addressing gender norms that affect men's attitudes and use while respecting women's autonomy; reaching adolescent boys; including men as users in policies and guidelines; scaling up successful programming; filling gaps with implementation research and monitoring & evaluation; and creating more contraceptive options for men.

  19. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  20. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The objective of the Hazardous Waste Development, Demonstration and Disposal (HAZWDDD) Program Plan is to ensure that the needs for treatment and disposal of all its hazardous and mixed wastes have been identified and planned for. A multifaceted approach to developing and implementing this plan is given, including complete plans for each of the five installations, and an overall integrated plan is also described in this report. The HAZWDDD Plan accomplishes the following: (1) provides background and organizational information; (2) summarizes the 402 hazardous and mixed waste streams from the five installations by grouping them into 13 general waste categories; (3) presents current treatment, storage, and disposal capabilities within Energy Systems; (4) develops a management strategy by outlining critical issues, presents flow sheets describing management schemes for problem waste streams, and builds on the needs identified; (5) outlines specific activities needed to implement the strategy developed; and (6) presents schedule and budget requirements for the next decade. The HAZWDDD Program addresses current and future technical problems and regulatory issues and uncertainties. Because of the nature and magnitude of the problems in hazardous and mixed waste management, substantial funding will be required. 10 refs., 39 figs., 16 tabs

  1. Waste feed delivery program systems engineering implementation plan

    International Nuclear Information System (INIS)

    O'Toole, S.M.; Hendel, B.J.

    1998-01-01

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products

  2. International Population Assistance and Family Planning Programs: Issues for Congress

    Science.gov (United States)

    2008-07-24

    activities and USAID began to purchase contraceptives for distribution through its programs in the developing world. The first International Population...agenda of initiatives that include the promotion of gender equality, increasing adolescent education on sexuality and reproductive health, and...maintains family planning projects in more than 60 countries that include counseling and services, training of health workers, contraceptive supplies and

  3. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  4. Qualification plan for the Genmod-PC computer program

    International Nuclear Information System (INIS)

    Richardson, R.B.; Wright, G.M.; Dunford, D.W.; Linauskas, S.H.

    2002-07-01

    Genmod-PC is an internal dosimetry code that uses Microsoft Windows operating system, and that currently calculates radionuclide doses and intakes for an adult male. This report provides a plan for specifying the quality assurance measures that conform to the recommendations of the Canadian Standards Association, as well as AECL procedural requirements for a legacy computer program developed at AECL. (author)

  5. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  6. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site

  7. Sequence Coding and Search System Backfit Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Lovell, C.J.; Stepina, P.L.

    1985-03-01

    The Sequence Coding and Search System is a computer-based encoding system for events described in Licensee Event Reports. This data system contains LERs from 1981 to present. Backfit of the data system to include LERs prior to 1981 is required. This report documents the Quality Assurance Program Plan that EG and G Idaho, Inc. will follow while encoding 1980 LERs

  8. Quality Assurance Plans under the Renewable Fuel Standard Program

    Science.gov (United States)

    Quality Assurance Plan or (QAP) is a voluntary program where independent third-parties may audit and verify that RINs have been properly generated and are valid for compliance purposes. RINs verified under a QAP may be purchased by regulated parties.

  9. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  10. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  11. The Persuasive Program in Adult Education: Theory and Planning.

    Science.gov (United States)

    Atkinson, Thomas Grant

    The purpose of this study was to investigate, develop, and explicate a procedure, theoretical in nature, which adult educators can use for comprehending, analyzing and planning single-event persuasive programs for adults. The study conceptualized persuasion as a behavioral phenomenon consisting of verifiable human action which constitutes, or is…

  12. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  13. Polymorphic Uncertain Linear Programming for Generalized Production Planning Problems

    Directory of Open Access Journals (Sweden)

    Xinbo Zhang

    2014-01-01

    Full Text Available A polymorphic uncertain linear programming (PULP model is constructed to formulate a class of generalized production planning problems. In accordance with the practical environment, some factors such as the consumption of raw material, the limitation of resource and the demand of product are incorporated into the model as parameters of interval and fuzzy subsets, respectively. Based on the theory of fuzzy interval program and the modified possibility degree for the order of interval numbers, a deterministic equivalent formulation for this model is derived such that a robust solution for the uncertain optimization problem is obtained. Case study indicates that the constructed model and the proposed solution are useful to search for an optimal production plan for the polymorphic uncertain generalized production planning problems.

  14. Operating plan for the Office of International Health Programs

    International Nuclear Information System (INIS)

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office's three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described

  15. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  16. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    International Nuclear Information System (INIS)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants

  17. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  18. A program plan for photovoltaic buildings in Florida

    International Nuclear Information System (INIS)

    Ventre, Gerard G.

    1999-01-01

    The Florida Photovoltaic (PV) Buildings Program will conduct a variety of application experiments over the next decade to gather information that will help define the costs, value and benefits of using photovoltaics with buildings. Four main sources of revenue will support the program: a photovoltaic system buy down (from the present through December 2001), green pricing (present to 2010 and beyond), buy up by end users, and contracts, grants and other subsidies. To give the program sufficient breadth, three different application experiments are planned for each of nine target groups. The data and information from these experiments will help reduce or eliminate key barriers to the commercialisation of photovoltaic buildings. (Author)

  19. Program of Regional Collaboration between Eastern Part of Russia and Northeast China: Present and Future

    OpenAIRE

    Dmitriy Aleksandrovich Izotov

    2014-01-01

    The author uses Russian and Chinese sources of information to analyze the current status and evaluate realization prospects of investment projects within the Cooperation Program between eastern regions of Russia and northeast China. State budget financed construction of transport and border infrastructure is being implemented as planned both in Russia and China. Sectoral distribution of key Program projects is found to be unbalanced: Russian regions specialize in mining and primary processing...

  20. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.