  1. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P. [Risoe National Lab., DTU, System Analysis Dept., Roskilde (Denmark); Weber, C. [Univ. Duisburg-Essen, Chai og Energy Management (Germany); Barth, R.; Brand, H. [Univ. of Stuttgart, Inst. of Energy Economics and the Rational Use of Energy (Germany)

    2007-05-15

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and unpredictability of wind power production. For large amounts of wind power production the expectation is that the operational costs of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative production having properties like conventional production, i.e. being predictable and less variable. The choice of the characteristics of the alternative production is not straight forward and will therefore influence the operational costs induced by wind power production. This paper presents a method for calculating the change in operational costs due to wind power production using a stochastic optimization model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs namely perfectly predictable wind power production enabling calculation of the costs connected to unpredictability, and constant wind power production enabling calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed in the paper. (au)

  2. Optimum operation of a small power production facility

    Energy Technology Data Exchange (ETDEWEB)

    Capehart, B.L.; Mahoney, J.F.; Sivazlian, B.D.

    1983-09-01

    To help reduce the U.S.A.'s dependence on imported oil for electrical power generation, the 1978 National Energy Act established regulations to promote construction and operation of cogeneration and small power production facilities. Many of these facilities are presently under construction, with a great number planned. This paper examines the operation of a small power production facility with on-site generation and storage, on-site use, and connection to an electric utility grid system for the purpose of both selling excess power and buying power. It is assumed that the buying and selling price of electricity varies frequently during the day and that the relevant price and demand data may be accurately projected into the near future. With this system description, a mathematical model is formulated and solved by linear programming to obtain a series of periodic buy and sell decisions so as to maximize the profit from operating the small power production facility. Results are presented to illustrate the methodology for determining potential profits.

  3. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    DEFF Research Database (Denmark)

    Meibom, Peter; Weber, C.; Barth, R.

    2009-01-01

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start......-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing...... the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward...

  4. Cohering power of quantum operations

    Energy Technology Data Exchange (ETDEWEB)

    Bu, Kaifeng, E-mail: bkf@zju.edu.cn [School of Mathematical Sciences, Zhejiang University, Hangzhou 310027 (China); Kumar, Asutosh, E-mail: asukumar@hri.res.in [Harish-Chandra Research Institute, Chhatnag Road, Jhunsi, Allahabad 211019 (India); Homi Bhabha National Institute, Anushaktinagar, Mumbai 400094 (India); Zhang, Lin, E-mail: linyz@zju.edu.cn [Institute of Mathematics, Hangzhou Dianzi University, Hangzhou 310018 (China); Wu, Junde, E-mail: wjd@zju.edu.cn [School of Mathematical Sciences, Zhejiang University, Hangzhou 310027 (China)

    2017-05-18

    Highlights: • Quantum coherence. • Cohering power: production of quantum coherence by quantum operations. • Study of cohering power and generalized cohering power, and their comparison for differentmeasures of quantum coherence. • Operational interpretation of cohering power. • Bound on cohering power of a generic quantum operation. - Abstract: Quantum coherence and entanglement, which play a crucial role in quantum information processing tasks, are usually fragile under decoherence. Therefore, the production of quantum coherence by quantum operations is important to preserve quantum correlations including entanglement. In this paper, we study cohering power–the ability of quantum operations to produce coherence. First, we provide an operational interpretation of cohering power. Then, we decompose a generic quantum operation into three basic operations, namely, unitary, appending and dismissal operations, and show that the cohering power of any quantum operation is upper bounded by the corresponding unitary operation. Furthermore, we compare cohering power and generalized cohering power of quantum operations for different measures of coherence.

  5. Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment

    International Nuclear Information System (INIS)

    Kocsis, C.; Hardcastle, S.

    2007-01-01

    The benefits of replacing diesel engines with fuel cells in mine production equipment were discussed. The paper was part of a multi-year feasibility study conducted to evaluate the use of hydrogen fuel cell-powered equipment to replace diesel engine powered equipment in underground mining operations. The feasibility study demonstrated that fuel cells are capable of eliminating the unwanted by-products of combustion engines. However, the use of fuel cells also reduced the amount of ventilation that mines needed to supply, thereby further reducing energy consumption. This study examined the benefits of replacing diesel engines with fuel cells, and discussed the mitigating qualifiers that may limit ventilation energy savings. Solutions to retaining and maintaining additional ventilation in the event of hydrogen leaks from fuel cell stacks were also investigated. The analyses were conducted on 6 operating mines. Current operating costs were compared with future operating conditions using fuel cell powered production vehicles. Operating costs of the primary ventilation system were established with a mine ventilation simulator. The analysis considered exhaust shaft velocities, heating system air velocities, and levels of silica exposure. Canadian mine design criteria were reviewed. It was concluded that appropriate safeguards are needed along hydrogen distribution lines to lower the impacts of hydrogen leaks. Large financial commitments may also be required to ensure a spark-free environment. 20 refs., 6 tabs., 3 figs

  6. Influence of renewable sources of energy on the operation of the production capacity in electrical power systems

    International Nuclear Information System (INIS)

    Nikolova-Potseva, Sofija

    2012-01-01

    In the PhD dissertation an approach for solving the generation scheduling problem between conventional power plants in a complex power system with integrated wind power plants is presented. The system that is analyzed is composed of thermal power plants, storage hydro power plants, pumped-storage hydro power plants, additional systems to deal with pumping water of pumped-storage hydro power plants and wind power plants. The model takes into consideration thermal power plants with and without contracted energy production over the study period. The objective of the generation scheduling problem in such a hybrid system is to determine the optimal amounts of generation power of conventional power plants over the study period, so that the total production costs of thermal power plants and additional units engaged for pumping water of pumped-storage hydro power plants be minimal and be satisfied the relevant real operational constraints of the system. The problem model takes into account the following constraints: power balance equations, constraints resulting from power output limits of thermal and hydro power plants, balance equations for contracted energy for thermal power plants with contracted energy production, power output limits of wind energy system and balance equations for available volume of water of storage hydro power plants and pumped-storage hydro power plants over the study period. The proposed model for power plant optimal operation does not take into account the system configuration and network losses. The computer program is developed in Matlab, in order to verify the proposed method for solving the optimal generation scheduling of conventional power plants in complex power system with integrated wind power plants. The developed computer program has been applied to specific systems and different variants of systems with integrated wind power plants have been analyzed. Particular problem in the operation of the power system is suppressed energy towards

  7. Preparation and practice for nuclear power plant operation

    International Nuclear Information System (INIS)

    Wu Xuesong; Lu Tiezhong

    2015-01-01

    The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of nuclear power plant from starting construction to production is as long as five years, the professional requirements of nuclear power operation are very strict, and the requirements for nuclear safety are also extremely high. Especially after the Fukushima accident, higher requirements for the safe operation of nuclear power plant are posed by competent authorities of the national level, regulatory authorities and each nuclear power groups. Based on the characteristics of the construction phase of nuclear power plant and in combination with engineering practice, this paper expounds the system established in the field of nuclear power plant operation and generally analyses the related management innovation. (authors)

  8. Multi-fuel multi-product operation of IGCC power plants with carbon capture and storage (CCS)

    International Nuclear Information System (INIS)

    Cormos, Ana-Maria; Dinca, Cristian; Cormos, Calin-Cristian

    2015-01-01

    This paper investigates multi-fuel multi-product operation of IGCC plants with carbon capture and storage (CCS). The investigated plant designs co-process coal with different sorts of biomass (e.g. sawdust) and solid wastes, through gasification, leading to different decarbonised energy vectors (power, hydrogen, heat, substitute natural gas etc.) simultaneous with carbon capture. Co-gasification of coal with different renewable energy sources coupled with carbon capture will pave the way towards zero emissions power plants. The energy conversions investigated in the paper were simulated using commercial process flow modelling package (ChemCAD) in order to produce mass and energy balances necessary for the proposed evaluation. As illustrative cases, hydrogen and power co-generation and Fischer–Tropsch fuel synthesis (both with carbon capture), were presented. The case studies investigated in the paper produce a flexible ratio between power and hydrogen (in the range of 400–600 MW net electricity and 0–200 MW th hydrogen considering the lower heating value) with at least 90% carbon capture rate. Special emphasis were given to fuel selection criteria for optimisation of gasification performances (fuel blending), to the selection criteria for gasification reactor in a multi-fuel multi-product operation scenario, modelling and simulation of whole process, to thermal and power integration of processes, flexibility analysis of the energy conversion processes, in-depth techno-economic and environmental assessment etc. - Highlights: • Assessment of IGCC-based energy vectors poly-generation systems with CCS. • Optimisation of gasification performances and CO 2 emissions by fuel blending. • Multi-fuel multi-product operation of gasification plants

  9. Change-management. From commercial power operation to post power operation and decommissioning

    International Nuclear Information System (INIS)

    Wasinger, Karl

    2015-01-01

    Transition from power generation to decommissioning challenges utilities. Power generation is mainly characterized by a stable working environment and constant workload, decommissioning and dismantling, however, by transformation and change. Also, changing requirements for the workforce's skills challenge the organization and its senior management. Ensuring effective and efficient performance, while maintaining motivation of staff, requires adjustment of management processes as well as of operational organization and human resources management. AREVA has more than 20 years of experience in decommissioning of own nuclear fuel cycle plants in France, as well as of other large plants and power reactors in Germany, the United Kingdom and the US. Therefore, the group has developed and successfully implemented integrated change management processes. The implementation of well-established and proven methods, developed by the productive industry and adjusted to the nuclear regulatory requirements, significantly improves the performance and efficiency of means and methods in use. The AREVA Performance Improvement Process defines concrete approaches to identify and improve potential deficits of productivity in six main areas (decommissioning scenarios and stra-tegies, waste treatment and logistics, operations management, supply chain, regulatory monitoring and controls as well as dismantling operation). Nuclear plant and facility owners around the world benefit from AREVA experts well experienced in execution of large and complex decommissioning projects.

  10. Operation Modeling of Power Systems Integrated with Large-Scale New Energy Power Sources

    Directory of Open Access Journals (Sweden)

    Hui Li

    2016-10-01

    Full Text Available In the most current methods of probabilistic power system production simulation, the output characteristics of new energy power generation (NEPG has not been comprehensively considered. In this paper, the power output characteristics of wind power generation and photovoltaic power generation are firstly analyzed based on statistical methods according to their historical operating data. Then the characteristic indexes and the filtering principle of the NEPG historical output scenarios are introduced with the confidence level, and the calculation model of NEPG’s credible capacity is proposed. Based on this, taking the minimum production costs or the best energy-saving and emission-reduction effect as the optimization objective, the power system operation model with large-scale integration of new energy power generation (NEPG is established considering the power balance, the electricity balance and the peak balance. Besides, the constraints of the operating characteristics of different power generation types, the maintenance schedule, the load reservation, the emergency reservation, the water abandonment and the transmitting capacity between different areas are also considered. With the proposed power system operation model, the operation simulations are carried out based on the actual Northwest power grid of China, which resolves the new energy power accommodations considering different system operating conditions. The simulation results well verify the validity of the proposed power system operation model in the accommodation analysis for the power system which is penetrated with large scale NEPG.

  11. Phytoplankton abundance and productivity in the vicinity of an operating power plant

    International Nuclear Information System (INIS)

    Poornima, E.H.; Rajadurai, M.; Venugopalan, V.P.; Narasimhan, S.V.; Rao, V.N.R.

    2007-01-01

    The impact of power plant operation on the abundance and productivity of phytoplankton was monitored over a period of fifteen months. Field studies showed that in spite of the consistent reduction in phytoplankton biomass and productivity at the Outfall where the heated effluent is discharged, stations close to the mixing point did not show any significant change in phytoplankton biomass or productivity. This suggested that at the Mixing point, mixing of the heated effluents with the ambient seawater was rapid and very extensive, ensuring recovery of phytoplankton biomass and their productivity potential. Field studies during low-dose, shock-dose and no-chlorination suggested that chlorination caused greater damage to phytoplankton chlorophyll than temperature. Laboratory experiments revealed that diatom growth was not much influenced by passage through the condenser cooling system and they were able to grow between 28 deg C and 40 deg C. Short term experiments indicated that chemical stress due to chlorination might be more important than temperature in reducing phytoplankton biomass and productivity. Combined treatment of temperature and chlorine showed little synergistic effect. The data suggest that formulation of condenser discharge criteria of power plants must consider the relative effects of both the stress factors viz., temperature and chlorine. (author)

  12. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

  13. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section `Special Reports` three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES) Figs, tabs.; Also available in Swedish

  14. Operating experience from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1999-01-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section 'Special Reports' three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES)

  15. Development of wind power production in arctic climate

    Energy Technology Data Exchange (ETDEWEB)

    Peltola, E.; Kaas, J.; Aarnio, E. [Kemijoki Oy (Finland)

    1998-10-01

    The project Development of wind power production in arctic climate is a direct continuation of Arctic wind energy research project, which started in 1989. The main topics in 1996-97 have been production development and commercialising the blade heating systems, development of operation and maintenance practices of arctic wind power plants, preparations for new wind farms and various network connection and energy system studies. Practical operations have taken place in Pyhaetunturi test power plant and in Paljasselkae and Lammashovi power plants, which are in commercial operation

  16. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  17. Thermodynamic Analysis of a Ship Power Plant Operating with Waste Heat Recovery through Combined Heat and Power Production

    Directory of Open Access Journals (Sweden)

    Mirko Grljušić

    2014-11-01

    Full Text Available The goal of this research is to study a cogeneration plant for combined heat & power (CHP production that utilises the low-temperature waste energy in the power plant of a Suezmax-size oil tanker for all heating and electricity requirements during navigation. After considering various configurations, a standard propulsion engine operating at maximum efficiency and a CHP Plant with R245fa fluid using a supercritical organic Rankine cycle (ORC is selected. All the ship heat requirements can be covered by energy of organic fluid after expansion in the turbine, except feeder-booster heating. Hence, an additional quantity of working fluid may be heated using an after Heat Recovery Steam Generator (HRSG directed to the feeder-booster module. An analysis of the obtained results shows that the steam turbine plant does not yield significant fuel savings. However, a CHP plant with R245fa fluid using supercritical ORC meets all of the demands for electrical energy and heat while burning only a small amount of additional fuel in HRSG at the main engine off-design operation.

  18. Experience gained in the operation of the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Kueffer, K. von.

    1976-01-01

    The 24th December 1969, when the Beznau 1 nuclear power station was placed in commercial operation, marked the beginning of electricity production from nuclear energy in Switzerland. Beznau 2 followed on the 15th March 1972. Together with the Muehleberg nuclear power station, nuclear energy accounts for approximately 20 percent of the total electricity production in Switzerland. Until the end of 1975, Switzerland's three nuclear power stations had a mean energy utilisation factor of 71.3 percent which, as compared with a mean energy utilization factor of 60.5 percent for all the nuclear power stations in the West, suggests fairly good operational results. Problems that arose during operation are discussed in detail. By way of summary it is stated that the operation of the Beznau nuclear power station has so far proved a success. The production of electrical energy has always remained within the limits imposed by the law and by the safety aspects. (Auth.)

  19. 47 CFR 73.51 - Determining operating power.

    Science.gov (United States)

    2010-10-01

    ...'s input power directly from the RF voltage, RF current, and phase angle; or (2) calculating the product of the licensed antenna or common point resistance at the operating frequency (see § 73.54), and... the resistance has been determined. (b) The authorized antenna input power for each station shall be...

  20. Computational Efficiency of Economic MPC for Power Systems Operation

    DEFF Research Database (Denmark)

    Standardi, Laura; Poulsen, Niels Kjølstad; Jørgensen, John Bagterp

    2013-01-01

    In this work, we propose an Economic Model Predictive Control (MPC) strategy to operate power systems that consist of independent power units. The controller balances the power supply and demand, minimizing production costs. The control problem is formulated as a linear program that is solved...

  1. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  2. Operating experience from Swedish nuclear power plants 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2.

  3. Operating experience from Swedish nuclear power plants 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2

  4. Coal gasification and the power production market

    International Nuclear Information System (INIS)

    Howington, K.; Flandermeyer, G.

    1995-01-01

    The US electric power production market is experiencing significant changes sparking interest in the current and future alternatives for power production. Coal gasification technology is being marketed to satisfy the needs of the volatile power production industry. Coal gasification is a promising power production process in which solid coal is burned to produce a synthesis gas (syn gas). The syn gas may be used to fuel combustion integrated into a facility producing electric power. Advantages of this technology include efficient power production, low flue gas emissions, flexible fuel utilization, broad capability for facility integration, useful process byproducts, and decreased waste disposal. The primary disadvantages are relatively high capital costs and lack of proven long-term operating experience. Developers of coal gasification intend to improve on these disadvantages and lop a strong position in the power generation market. This paper is a marketing analysis of the partial oxidation coal gasification processes emerging in the US in response to the market factors of the power production industry. A brief history of these processes is presented, including the results of recent projects exploring the feasibility of integrated gasification combined cycle (IGCC) as a power production alternative. The current power generation market factors are discussed, and the status of current projects is presented including projected performance

  5. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  6. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-05-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the perssonnel or the environment. For remedying certain defects found in the administrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days

  7. Operating experience from Swedish nuclear power plants, 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The total generation of electricity from Swedish nuclear power plants was 70.1 TWh during 1999, which is slightly more than the mean value for the last five years. The total electricity consumption decreased by one percent, compared with 1998, to a total of 142.3 TWh, due to an unusually warm summer and autumn. The abundant supply of hydroelectric power resulted in comparatively extensive load-following operation by the nuclear plants during the year. Production losses due to low demand totalled 3.0 TWh. The closure of Barsebaeck 1 will result in a capacity reduction exceeding 4 TWh per year. The hydroelectric power production was 70 TWh, which was 6 TWh more than during a normal year, i.e. a year with average rainfall. The remaining production sources, mainly from solid fuel plants combined with district heating contributed 9 TWh. Electricity generation by means of wind power is still increasing. There are now about 470 wind power stations, which produced 0.3 TWh during the year. The total electricity generation totalled 149.8 TWh, a three percent decrease compared with 1998. The preliminary figures for export were 15.9 TWh and for import 8.4 TWh. The figures above are calculated from the preliminary production result. A comprehensive report on electric power supply and consumption in Sweden is provided in the 1999 Annual Report from the Swedish Power Association. The unit capability factor for the PWRs at Ringhals averaged 91%, while the BWRs averaged 82% mainly due to the extended outages. The BWR reactors at Forsmark averaged as much as 93%. Forsmark 1 experienced the shortest refuelling outage ever in Sweden, only 9 days and 20 hours. In May, Oskarshamn 2 passed a historical milestone - the unit produced 100 TWh since connection to the grid in 1974. The final production day for Barsebaeck 1, which had been in commercial operation since 1975, was on November 30 when a decision by the Swedish Government revoked the operating licence. Three safety-related events

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-07-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. No event in the report period, or in the whole year of 1986, essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. For remedying certain defects found in the adminstrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days in September

  9. Economic Impact of Nuclear Power Plant in The Operational

    International Nuclear Information System (INIS)

    Sriyana

    2004-01-01

    Study on economic impact of nuclear power plant in the operational stage, in Madura has been conducted. The object of the study is SMART technology which is coupled with desalination installation. The power capacity is 2 x 100 M We and the water production capacity is 4 x 10,000 m 3 /day. This technology has been developed by Korea, but until recently there is no units in construction or operation. Input-Output analysis model is applied as the methodology of this study. Economic sector is aggregated from 56 x 56 to 10 x 10. This aggregation is meant to reduce the uncertainty in long term projection. This study conclude that : (1) In the operational stage SMART Nuclear Power Desalination will give an output to local economic about Rp 908.12 billion per year. (2) Electricity and water production will provide output direct impact to Madura about Rp. 1,234 trillion and will give direct impact to Regional Product Domestic Bruto (PDRB) about Rp. 138.7 billion. (3) Output impact to the electricity sector and fresh water sector is about 5.37% and 1.57% compared to PDRB 2018. (author)

  10. Integrated approach to economical, reliable, safe nuclear power production

    International Nuclear Information System (INIS)

    1982-06-01

    An Integrated Approach to Economical, Reliable, Safe Nuclear Power Production is the latest evolution of a concept which originated with the Defense-in-Depth philosophy of the nuclear industry. As Defense-in-Depth provided a framework for viewing physical barriers and equipment redundancy, the Integrated Approach gives a framework for viewing nuclear power production in terms of functions and institutions. In the Integrated Approach, four plant Goals are defined (Normal Operation, Core and Plant Protection, Containment Integrity and Emergency Preparedness) with the attendant Functional and Institutional Classifications that support them. The Integrated Approach provides a systematic perspective that combines the economic objective of reliable power production with the safety objective of consistent, controlled plant operation

  11. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  12. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  13. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  14. Production LHC HTS power lead test results

    CERN Document Server

    Tartaglia, M; Fehér, S; Huang, Y; Orris, D F; Pischalnikov, Y; Rabehl, Roger Jon; Sylvester, C D; Zbasnik, J

    2005-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under "standard" and "extreme" operating conditions, and the stability of performance across thermal cycles.

  15. Production LHC HTS power lead test results

    International Nuclear Information System (INIS)

    Tartaglia, M.A.; Carcagno, R.H.; Feher, S.; Huang, Y.; Orris, D.F.; Pischalnikov, Y.; Rabehl, R.J.; Sylvester, C.; Zbasnik, J.

    2004-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under ''standard'' and ''extreme'' operating conditions, and the stability of performance across thermal cycles

  16. Economic Operation of Power Systems with Significant Wind Power Penetration

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa

    This dissertation addresses economic operation of power systems with high penetration of wind power. Several studies are presented to address the economic operation of power systems with high penetration of variable wind power. The main concern in such power systems is high variability...... and unpredictability. Unlike conventional power plants, the output power of a wind farm is not controllable. This brings additional complexity to operation and planning of wind dominant power systems. The key solution in face of wind power uncertainty is to enhance power system flexibility. The enhanced flexibility......, cooperative wind-storage operation is studied. Lithium-Ion battery units are chosen as storage units. A novel formulation is proposed to investigate optimal operation of a storage unit considering power system balancing conditions and wind power imbalances. An optimization framework is presented to increase...

  17. Strategy for optimal operation of a biomass-fired cogeneration power plant

    International Nuclear Information System (INIS)

    Prasertsan, S.; Krukanont, P.; Nigamsritragul, P.; Kirirat, P.

    2001-01-01

    Biomass-fired cogeneration not only is an environmentally friendly energy production, but also possesses high energy conversion efficiency. Generally, the wood product industry requires both heat and electricity. Combined heat and power generation (cogeneration) using wood residue has a three-fold benefit: waste minimization, reduction of an energy-related production cost and additional income from selling the excess electricity to the utility. In reality, the process heat demand fluctuates according to the production activities in the factory. The fluctuation of process heat demand affects the cogeneration efficiency and the electricity output and, consequently, the financial return, since the prices of heat and electricity are different. A study by computer simulation to establish a guideline for optimum operation of a process heat fluctuating cogeneration power plant is presented. The power plant was designed for a sawmill and an adjacent plywood factory using wood wastes from these two processes. The maximum boiler thermal load is 81.9 MW while the electricity output is in the range 19-24 MW and the process heat 10-30 MW. Two modes of operation were studied, namely the full (boiler) load and the partial (boiler) load. In the full load operation, the power plant is operated at a maximum boiler thermal load, while the extracted steam is varied to meet the steam demand of the wood-drying kilns and the plywood production. The partial load operation was designed for the partially fuelled boiler to provide sufficient steam for the process and to generate electricity at a desired capacity ranging from the firmed contract of 19 MW to the turbine maximum capacity of 24 MW. It was found that the steam for process heat has an allowable extracting range, which is limited by the low pressure feed water heater. The optimum operation for both full and partial load occurs at the lower limit of the extracting steam. A guideline for optimum operation at various combinations of

  18. Power plant operation and management in a deregulated market

    Energy Technology Data Exchange (ETDEWEB)

    Carraretto, Cristian [Department of Mechanical Engineering, University of Padova, Via Venezia, 1-35131 Padova (Italy)

    2006-05-15

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  19. Power plant operation and management in a deregulated market

    International Nuclear Information System (INIS)

    Carraretto, Cristian

    2006-01-01

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-06-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  1. Economic feasibility constraints for renewable energy source power production

    International Nuclear Information System (INIS)

    Biondi, L.

    1992-01-01

    Suitable analysis criteria for use in economic feasibility studies of renewable energy source power plants are examined for various plant types, e.g., pumped storage hydroelectric, geothermal, wind, solar, refuse-fuelled, etc. The paper focusses on the impacts, on operating cost and rate structure, of the necessity, depending on demand characteristics, to integrate renewable energy source power production with conventional power production in order to effectively and economically meet peak power demand. The influence of commercialization and marketing trends on renewable energy source power plant economic feasibility are also taken into consideration

  2. DISTRIBUTED ELECTRICAL POWER PRODUCTION SYSTEM AND METHOD OF CONTROL THEREOF

    DEFF Research Database (Denmark)

    2010-01-01

    The present invention relates to a distributed electrical power production system wherein two or more electrical power units comprise respective sets of power supply attributes. Each set of power supply attributes is associated with a dynamic operating state of a particular electrical power unit....

  3. 14 CFR 27.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...

  4. 14 CFR 29.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...

  5. Calculation of Efficiencies of a Ship Power Plant Operating with Waste Heat Recovery through Combined Heat and Power Production

    Directory of Open Access Journals (Sweden)

    Mirko Grljušić

    2015-05-01

    Full Text Available The aim of this research was to investigate the possibility of a combined heat & power (CHP plant, using the waste heat from a Suezmax-size oil tanker’s main engine, to meet all heating and electricity requirements during navigation. After considering various configurations, a standard propulsion engine operating at maximum efficiency, combined with a supercritical Organic Rankine cycle (ORC system, was selected to supply the auxiliary power, using R245fa or R123 as the working fluid. The system analysis showed that such a plant can meet all heat and electrical power requirements at full load, with the need to burn only a small amount of supplementary fuel in a heat recovery steam generator (HRSG when the main engine operates at part load. Therefore, it is possible to increase the overall thermal efficiency of the ship’s power plant by more than 5% when the main engine operates at 65% or more of its specified maximum continuous rating (SMCR.

  6. Reducing power consumption while performing collective operations on a plurality of compute nodes

    Science.gov (United States)

    Archer, Charles J [Rochester, MN; Blocksome, Michael A [Rochester, MN; Peters, Amanda E [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian E [Rochester, MN

    2011-10-18

    Methods, apparatus, and products are disclosed for reducing power consumption while performing collective operations on a plurality of compute nodes that include: receiving, by each compute node, instructions to perform a type of collective operation; selecting, by each compute node from a plurality of collective operations for the collective operation type, a particular collective operation in dependence upon power consumption characteristics for each of the plurality of collective operations; and executing, by each compute node, the selected collective operation.

  7. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-03-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  8. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  9. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  10. Power system for production, construction, life support and operations in space

    International Nuclear Information System (INIS)

    Sovie, R.J.

    1988-01-01

    As one looks to man's future in space it becomes obvious that unprecedented amounts of power are required for the exploration, colonization, and exploitation of space. Activities envisioned include interplanetary travel and LEO to GEO transport using electric propulsion, Earth and lunar observatories, advance space stations, free-flying manufacturing platforms, communications platforms, and eventually evolutionary lunar and Mars bases. These latter bases would start as camps with modest power requirements (kWes) and evolve to large bases as manufacturing, food production, and life support materials are developed from lunar raw materials. These latter activities require very robust power supplies (MWes). The advanced power system technologies being pursued by NASA to fulfill these future needs are described. Technologies discussed will include nuclear, photovoltaic, and solar dynamic space power systems, including energy storage, power conditioning, power transmission, and thermal management. The state-of-the-art and gains to be made by technology advancements will be discussed. Mission requirements for a variety of applications (LEO, GEO, lunar, and Martian) will be treated, and data for power systems ranging from a few kilowatts to megawatt power systems will be represented. In addition the space power technologies being initiated under NASA's new Civilian Space Technology Initiative (CSTI) and Space Leadership Planning Group Activities will be discussed

  11. The new operating conditions of French nuclear power plants

    International Nuclear Information System (INIS)

    Leclercq, J.

    1986-01-01

    Six themes are examined: France's unique position in view of the size of its nuclear operating plant, the role of nuclear power in matching electricity supply to demand, the excellent flexibility provided by PWR facilities in operation, the approaches used in the field of automatic operational control systems, the systematic use of data processing for maintenance and generation and the gains in productivity that can be gained as a result of improving fuel use [fr

  12. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  13. Improvement of uranium production efficiency to meet China's nuclear power requirements

    International Nuclear Information System (INIS)

    Zhang, R.

    1997-01-01

    Recently China put the Qinshan Nuclear Power Plant, with an installed capacity of 300 MW, in the province of Zhejiang and the Daya Bay Nuclear Power Plant, with a total installed capacity of 2 x 900 MW, in commercial operation. China plans a rapid growth in nuclear power from 1995 to 2010. China's uranium production will therefore also enter a new period with nuclear power increasing. In order to meet the demand of nuclear power for uranium special attention has been paid to both technical progress improvement using management with the aim of reducing the cost of uranium production. The application of the trackless mining technique has enhanced the uranium mining productivity significantly. China has produced a radiometric sorter, model 5421-2 for pre-concentrating uranium run-of-mine ore. This effectively increases the uranium content in mill feed and decreases the operating cost of hydrometallurgical treatment. The in situ leach technique after blasting is applied underground in the Lantian Mine, in addition to the surface heap leaching, and has obtained a perfect result. The concentrated acid-curing, and ferric sulphate trickle leaching process, will soon be used in commercial operation for treating uranium ore grading -5 to -7 mm in size. The annual production capability of the Yining Mine will be extended to 100 tonnes U using improving in situ leaching technology. For the purpose of improving the uranium production efficiency much work has been done optimizing the distribution of production centres. China plans to expand its uranium production to meet the uranium requirements of the developing nuclear power plants. (author). 4 tabs

  14. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  15. Fission product behaviour during operation of the second Peach Bottom core

    International Nuclear Information System (INIS)

    Malinauskas, A.P.; Nordwall, H.J. de; Dyer, F.F.; Wichner, R.P.; Martin, W.J.; Kolb, J.O.

    1976-01-01

    The Peach Bottom high-temperature, gas-cooled reactor began operation on 1 June 1967 and continued power production until 9 October 1969, accumulating 452 equivalent full power days (EFPD) operation. After reload, power production with Core 2 began 14 July 1970 and terminated 31 October 1974 after 897 EFPD operation. Surveillance of fission product release and behaviour was intensified during Core 2 operation to permit a wider range of measurements to be made. In addition to monitoring the noble gas content of the fuel element purge system and the coolant circuit, the programme was extended to include measurements of radioactive and other condensible species (including dust) entering or exiting the core and steam generator, and of surface concentrations of gamma-emitting nuclides deposited on the primary coolant surfaces. These data, which were obtained over the operating period April 1971 - October 1974, are summarized and discussed. The data demonstrate that caesium behaviour in the coolant circuit during the first two-thirds of Core 2 life was primarily governed by caesium released during Core 1 operation. The data also indicate that whereas the steam generator surfaces attenuate molecular caesium concentrations in the coolant, the dust-borne component is remarkably persistent. Driver fuel elements were removed from the reactor after 385 EFPD, 701 EFPD, and at end-of-life. These fuel elements are at various stages of an intensive post-irradiation examination. Some of the axial and radial concentration profiles of fission products which have been obtained are likewise presented. Although these profiles indicate varied fission product behaviour, the observations can in general be qualitatively described on the basis of the operational histories of the fuel elements. (author)

  16. 47 CFR 73.751 - Operating power.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operating power. 73.751 Section 73.751... International Broadcast Stations § 73.751 Operating power. No international broadcast station shall be authorized to install, or be licensed for operation of, transmitter equipment with: (a) A rated carrier power...

  17. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Malkoske, G.R.; Norton, J.L.; Slack, J.

    2002-01-01

    MDS Nordion has been supplying cobalt-60 sources to industry for industrial and medical purposes since 1946. These cobalt-60 sources are used in many market and product segments, but are primarily used to sterilize single-use medical products including; surgical kits, gloves, gowns, drapes, and cotton swabs. Other applications include sanitization of cosmetics, microbial reduction of pharmaceutical raw materials, and food irradiation. The technology for producing the cobalt-60 isotope was developed by MDS Nordion and Atomic Energy of Canada Limited (AECL) almost 55 years ago using research reactors at the AECL Chalk River Laboratories in Ontario, Canada. The first cobalt-60 source produced for medical applications was manufactured by MDS Nordion and used in cancer therapy. The benefits of cobalt-60 as applied to medical product manufacturing, were quickly realized and the demand for this radioisotope quickly grew. The same technology for producing cobalt-60 in research reactors was then designed and packaged such that it could be conveniently transferred to a utility/power reactor. In the early 1970's, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production for industrial irradiation applications was initiated in the four Pickering A CANDU reactors. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology for producing cobalt-60 in additional CANDU reactors. CANDU is unique among the power reactors of the world, being heavy water moderated and fuelled with natural uranium. They are also designed and supplied with stainless steel adjusters, the primary function of which is to shape the neutron flux to optimize reactor power and fuel bum-up, and to provide excess reactivity needed to overcome xenon-135 poisoning following a reduction of power. The reactor is designed to develop full power output with all of the adjuster

  18. Selected financial and operating ratios of public power systems

    International Nuclear Information System (INIS)

    Moody, D.

    1993-01-01

    In 1992, the American Public Power Association published its fourth report on financial and operating ratios. Based on 1990 data for the largest public power distribution systems, the report examined 21 categories of ratio indicators that can be used by public power distribution systems to assess their performance relative to the utilities of of comparable size and in the same geographic region. The 394 utilities summarized in the report are those that are required to file financial statements with the Energy Information Administration (EIA). Ratios were calculated from financial and operating data reported by utilities to the EIA. Data are presented for the following ratios: (1) revenue per kW/hr; (2) revenue for customer; (3) debt to total assets; (4) operating ratio; (5) current ratio; (6) times interest earned; (7) net income per revenue dollar; (8) uncollectible accounts per revenue dollar; (9) retail MW hr sales per manpower generation employee; (10) retail customers per nonpower generation employee; (11) total operation and maintenane expense per kW hr sold; (12) total operation and maintenance expense per retail customer; (13) total power supply expense kW hr sold; (14) purchased power cost per kW hr; (15) production expense per not kW hr; (16) retail customers for with reader; (17) distribution operation and maintenance expenses per retail customer; (18) distribution operation and maintenance expenses per circuit mile; (19) customer accounting, customer service and sales expenses per retail customers; (20) administration and general expenses per retail customer; (21) labor expense per worker-hour; (22) OSHA incidence rate; and (23) the system average interruptible duration index

  19. Study of the productivity evolution in the operation of CLAB

    International Nuclear Information System (INIS)

    Lundberg, H.

    2000-07-01

    SKB shall every year, on behalf of the power companies, send SKI a cost calculation for spent fuel handling and dismantling of the Swedish nuclear power plants. SKI has tried to investigate the future impact which the growth of money in the Nuclear Waste Fund might give in relation to the change of consumer price index, CPI. The long term yield of the Fund has been related to the change of CPI, as the bigger part of the fund money has been invested in real interest rate bonds. The cost development has been studied by SKI with an index named 'KBS-3-index', which is a basket of weighted factor price indexes made out of the SKB programme. Since 1986 and up to 1998, the KBS-3-index has increased about 14% more than CPI. If this discrepancy should continue during the whole period when Fund money should be available, the Fund would be insufficient. But the difference between KBS-3-index and CPI might be eliminated due to a future productivity development. At the moment, SKI has no knowledge about future productivity development in the SKB programme. A closer analysis of the facilities operated by SKB is therefore important. Nearest to study is the productivity at the operation of CLAB, Central Interim Storage Facility for Spent Nuclear Fuel. The work in CLAB is receiving and storing of spent nuclear fuel and core components and reloading from normal to compact cassettes. The consumption of all production factors can be measured in money. Here the total production factors are defined as the sum of the annual operation costs and the sum of annuities for reinvestments during the year. The development for total productivity is slightly increasing. Normal for a new business is that the productivity rises sharply in the beginning. Here the productivity is slightly decreasing in the beginning, and then rising, sinking and at last a sharp rising. Project compact storing was finished in 1992, and relocation to compact cassettes started in 1993. This is said to be the reason for

  20. Thermal power plant design and operation

    CERN Document Server

    Sarkar, Dipak

    2015-01-01

    Thermal Power Plant: Design and Operation deals with various aspects of a thermal power plant, providing a new dimension to the subject, with focus on operating practices and troubleshooting, as well as technology and design. Its author has a 40-long association with thermal power plants in design as well as field engineering, sharing his experience with professional engineers under various training capacities, such as training programs for graduate engineers and operating personnel. Thermal Power Plant presents practical content on coal-, gas-, oil-, peat- and biomass-fueled thermal power

  1. Subsurface Hybrid Power Options for Oil & Gas Production at Deep Ocean Sites

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, J C; Haut, R; Jahn, G; Goldman, J; Colvin, J; Karpinski, A; Dobley, A; Halfinger, J; Nagley, S; Wolf, K; Shapiro, A; Doucette, P; Hansen, P; Oke, A; Compton, D; Cobb, M; Kopps, R; Chitwood, J; Spence, W; Remacle, P; Noel, C; Vicic, J; Dee, R

    2010-02-19

    An investment in deep-sea (deep-ocean) hybrid power systems may enable certain off-shore oil and gas exploration and production. Advanced deep-ocean drilling and production operations, locally powered, may provide commercial access to oil and gas reserves otherwise inaccessible. Further, subsea generation of electrical power has the potential of featuring a low carbon output resulting in improved environmental conditions. Such technology therefore, enhances the energy security of the United States in a green and environmentally friendly manner. The objective of this study is to evaluate alternatives and recommend equipment to develop into hybrid energy conversion and storage systems for deep ocean operations. Such power systems will be located on the ocean floor and will be used to power offshore oil and gas exploration and production operations. Such power systems will be located on the oceans floor, and will be used to supply oil and gas exploration activities, as well as drilling operations required to harvest petroleum reserves. The following conceptual hybrid systems have been identified as candidates for powering sub-surface oil and gas production operations: (1) PWR = Pressurized-Water Nuclear Reactor + Lead-Acid Battery; (2) FC1 = Line for Surface O{sub 2} + Well Head Gas + Reformer + PEMFC + Lead-Acid & Li-Ion Batteries; (3) FC2 = Stored O2 + Well Head Gas + Reformer + Fuel Cell + Lead-Acid & Li-Ion Batteries; (4) SV1 = Submersible Vehicle + Stored O{sub 2} + Fuel Cell + Lead-Acid & Li-Ion Batteries; (5) SV2 = Submersible Vehicle + Stored O{sub 2} + Engine or Turbine + Lead-Acid & Li-Ion Batteries; (6) SV3 = Submersible Vehicle + Charge at Docking Station + ZEBRA & Li-Ion Batteries; (7) PWR TEG = PWR + Thermoelectric Generator + Lead-Acid Battery; (8) WELL TEG = Thermoelectric Generator + Well Head Waste Heat + Lead-Acid Battery; (9) GRID = Ocean Floor Electrical Grid + Lead-Acid Battery; and (10) DOC = Deep Ocean Current + Lead-Acid Battery.

  2. Reference costs for power generation; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    The first part of the 2003 study of reference costs for power generation has been completed. It was carried out by the General Directorate for Energy and Raw Materials (DGEMP) of the French Ministry of the Economy, Finance and Industry, with the collaboration of power-plant operators, construction firms and many other experts. A Review Committee of experts including economists (Forecasting Department, French Planning Office), qualified public figures, representatives of power-plant construction firms and operators, and non-governmental organization (NGO) experts, was consulted in the final phase. The study examines the costs of power generated by different methods (i.e. nuclear and fossil-fuel [gas-, coal-, and oil-fired] power plants) in the context of an industrial operation beginning in the year 2015. - The second part of the study relating to decentralized production methods (wind, photovoltaic, combined heat and power) is still in progress and will be presented at the beginning of next year. - 1. Study approach: The study is undertaken mainly from an investor's perspective and uses an 8% discount rate to evaluate the expenses and receipts from different years. In addition, the investment costs are considered explicitly in terms of interest during construction. - 2. Plant operating on a full-time basis (year-round): The following graph illustrates the main conclusions of the study for an effective operating period of 8000 hours. It can be seen that nuclear is more competitive than the other production methods for a year-round operation with an 8% discount rate applied to expenses. This competitiveness is even better if the costs related to greenhouse-gas (CO{sub 2}) emission are taken into account in estimating the MWh cost price. Integrating the costs resulting from CO{sub 2} emissions by non-nuclear fuels (gas, coal), which will be compulsory as of 2004 with the transposition of European directives, increases the total cost per MWh of these power generation

  3. Reference costs for power generation; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    The first part of the 2003 study of reference costs for power generation has been completed. It was carried out by the General Directorate for Energy and Raw Materials (DGEMP) of the French Ministry of the Economy, Finance and Industry, with the collaboration of power-plant operators, construction firms and many other experts. A Review Committee of experts including economists (Forecasting Department, French Planning Office), qualified public figures, representatives of power-plant construction firms and operators, and non-governmental organization (NGO) experts, was consulted in the final phase. The study examines the costs of power generated by different methods (i.e. nuclear and fossil-fuel [gas-, coal-, and oil-fired] power plants) in the context of an industrial operation beginning in the year 2015. - The second part of the study relating to decentralized production methods (wind, photovoltaic, combined heat and power) is still in progress and will be presented at the beginning of next year. - 1. Study approach: The study is undertaken mainly from an investor's perspective and uses an 8% discount rate to evaluate the expenses and receipts from different years. In addition, the investment costs are considered explicitly in terms of interest during construction. - 2. Plant operating on a full-time basis (year-round): The following graph illustrates the main conclusions of the study for an effective operating period of 8000 hours. It can be seen that nuclear is more competitive than the other production methods for a year-round operation with an 8% discount rate applied to expenses. This competitiveness is even better if the costs related to greenhouse-gas (CO{sub 2}) emission are taken into account in estimating the MWh cost price. Integrating the costs resulting from CO{sub 2} emissions by non-nuclear fuels (gas, coal), which will be compulsory as of 2004 with the transposition of European directives, increases the total cost per MWh of these power

  4. Wind power. Production in 2012; Vindkraft. Produksjon i 2012

    Energy Technology Data Exchange (ETDEWEB)

    Weir, David Edward; Nybakke, Karen

    2013-02-01

    In 2012 it was installed more wind power in Norway than in any year before. There was also production record with a total power generation from wind energy at ca. 1.57 TWh, equivalent to 1.1% of Norway's electricity production. 2012 was a relatively good 'wind year', with a production index of 107% for Norwegian wind farms as a whole. The length of time for wind was also relatively high compared to previous years with a national average of 2734 full load hours, corresponding to a capacity factor of 31%. Turbine availability also reached a record value of 95.6% in 2012 indicating more efficient operation of wind power plants in Norway.(eb)

  5. A subleading power operator basis for the scalar quark current

    Science.gov (United States)

    Chang, Cyuan-Han; Stewart, Iain W.; Vita, Gherardo

    2018-04-01

    Factorization theorems play a crucial role in our understanding of the strong interaction. For collider processes they are typically formulated at leading power and much less is known about power corrections in the λ ≪ 1 expansion. Here we present a complete basis of power suppressed operators for a scalar quark current at O({λ}^2) in the amplitude level power expansion in the Soft Collinear Effective Theory, demonstrating that helicity selection rules significantly simplify the construction. This basis applies for the production of any color singlet scalar in q\\overline{q} annihilation (such as b\\overline{b}\\to H ). We also classify all operators which contribute to the cross section at O({λ}^2) and perform matching calculations to determine their tree level Wilson coefficients. These results can be exploited to study power corrections in both resummed and fixed order perturbation theory, and for analyzing the factorization properties of gauge theory amplitudes and cross sections at subleading power.

  6. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-08-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such events and observations are described relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The report also includes a summary of the radiation safety of the plants' workers and the environment, as well as tabulated data on the production and load factors of the plants. The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in commercial operation during the whole first quarter of 1991. The load factor average was 99.1 %. Failures have been detected in the uppermost spacing lattices of nuclear fuel bundles removed from the Loviisa nuclear reactors. Further investigations into the significance of the failures have been initiated. In this quarter, renewed cooling systems for the instrumentation area were introduced at Loviisa 1. The modifications made in the systems serve to ensure reliable cooling of the area even during the hottest summer months when the possibility exists that the temperature of the automation equipment could rise too high causing malfunctions which could endanger plant safety. Occupational radiation doses and external releases of radioactivity were below prescribed limits in this quarter. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  7. Wind farm power production in the changing wind: Robustness quantification and layout optimization

    DEFF Research Database (Denmark)

    Feng, Ju; Shen, Wen Zhong

    2017-01-01

    Wind farms operate often in the changing wind. The wind condition variations in a wide range of time scales lead to the variability of wind farms’ power production. This imposes a major challenge to the power system operators who are facing a higher and higher penetration level of wind power. Thu...

  8. Technical support for nuclear power operations

    International Nuclear Information System (INIS)

    1999-04-01

    This report prepared by the group of senior experts from nuclear operating organizations in Member states, addresses the problem of improving the operating performance of nuclear power plants. Safe and reliable operation is essential for strengthening the viability of nuclear power in the increasingly competitive market of electric power. Basic principles and requirements concerning technical procedures and developed practices are discussed. Report reflects the best current international practices and presents those management initiatives that go beyond the mandated regulatory compliance and could lead to enhancement od operational safety and improved plant performance. By correlating experiences and presenting collective effective practices it is meant to assist nuclear power plant managers in achieving improvement in operation through the contribution of effective technical support

  9. The operation of nuclear power plants

    International Nuclear Information System (INIS)

    Brosche, D.

    1992-01-01

    The duties to be performed in managing the operation of a nuclear power plant are highly diverse, as will be explained in this contribution by the examples of the Grafenrheinfeld Nuclear Power Station. The excellent safety record and the high availabilities of German nuclear power plants demonstrate that their operators have adopted the right approaches. Systematic evaluation of the operating experience accumulated inhouse and in other plants is of great significance in removing weak spots and improving operation. The manifold and complex activities in the structure of organization and of activities in a nuclear power plant require a high degree of division of labor. (orig.) [de

  10. Economic evaluation of private power production under uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Weiguo Xing; Wu, F.F. [University of Hong Kong (China). Centre for Electrical Energy Systems

    2003-02-01

    Private power production is becoming an increasingly important source of electricity generation. In developing countries, build-operate-transfer (BOT) arrangement has emerged as a dominant form of private investment. Pricing private power production at its avoided cost is the breakeven point for the utility in economic evaluation, and uncertainties must be taken into account. In this paper, an approach of calculating the breakeven cost to the utility of a BOT power plant whose contract lasts for 10-25 years is proposed. The proposed approach requires the computation of production costs from long-term generation expansion planning (GEP) under future uncertainties. To facilitate the inclusion of constraints introduced by BOT plants in GEP and uncertainties, a genetic algorithm method is utilized in GEP. The breakeven cost is a useful measure in the economic evaluation of BOT power plants. An example is presented to illustrate the economic evaluation of BOT plants using the concept of breakeven cost.(author)

  11. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-09-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear safety and radiation protection which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing modifications at the nuclear power plants and issues relating to the use of nuclear energy which are of general interest are also reported. The reports include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the first quarter of 1993, a primary feedwater system pipe break occurred at Loviisa 2, in a section of piping after a feedwater pump. The break was erosion-corrosion induced. Repairs and inspections interrupted power generation for seven days. On the International Nuclear Event Scale the event is classified as a level 2 incident. Other events in the first quarter of 1993 had no bearing on nuclear safety and radiation protection

  12. Optimization of power system operation

    CERN Document Server

    Zhu, Jizhong

    2015-01-01

    This book applies the latest applications of new technologies topower system operation and analysis, including new and importantareas that are not covered in the previous edition. Optimization of Power System Operation covers both traditional andmodern technologies, including power flow analysis, steady-statesecurity region analysis, security constrained economic dispatch,multi-area system economic dispatch, unit commitment, optimal powerflow, smart grid operation, optimal load shed, optimalreconfiguration of distribution network, power system uncertaintyanalysis, power system sensitivity analysis, analytic hierarchicalprocess, neural network, fuzzy theory, genetic algorithm,evolutionary programming, and particle swarm optimization, amongothers. New topics such as the wheeling model, multi-areawheeling, the total transfer capability computation in multipleareas, are also addressed. The new edition of this book continues to provide engineers andac demics with a complete picture of the optimization of techn...

  13. Operation of nuclear power plants

    International Nuclear Information System (INIS)

    Severa, P.

    1988-04-01

    The textbook for training nuclear power plant personnel is centred on the most important aspects of operating modes of WWER-440 reactors. Attention is devoted to the steady state operation of the unit, shutdown, overhaul with refuelling, physical and power start-up. Also given are the regulations of shift operation and the duties of individual categories of personnel during the shift and during the change of shifts. (Z.M.). 3 figs., 1 tab

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-09-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  15. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    1988-04-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tubulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  16. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1986-08-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. (author)

  17. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.; Lehtinen, P.

    1985-11-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and load factors of the plants. (author)

  18. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Heimburger, H.

    1988-08-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  19. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Ottosson, C.

    1989-05-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.; Koponen, H.; Nevander, O.; Paltemaa, R.; Poellaenen, I.; Rannila, P.; Valtonen, K.; Vilkamo, O.

    1988-02-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  1. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.

    1988-09-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hzard to the personnel or the environment

  2. Training of power plant operating personnel

    International Nuclear Information System (INIS)

    Kraftwerksschule, E.V.

    1986-01-01

    In Germany, professional training of power plant operating personnel became an important issue in the fifties, when power plant parameters as well as complexity of instrumentation and control increased considerably. Working Groups of VGB Technische Vereiningung der Grosskraftwerketreiber e.v. (Association of Large Power Plant Operators) developed a professional career for power plant operating personnel and defined pre-requisites, scope and objectives of training. In 1957 the German utilities founded KRAFTWERKSSCHULE E.V. (kws) as a school for theoretical training and for guidance of practical training in the power plants. KWS is a non-profit organisation and independent of authorities. Today KWS has 127 members in Germany and in 6 other countries. The objectives of KWS include the training of: -Kraftwerker (control room operators; - Kraftwerksmesiter (shift supervisors); and - shift engineers; according the guidelines of the VGB

  3. Optimal Operation of Plug-In Electric Vehicles in Power Systems with High Wind Power Penetrations

    DEFF Research Database (Denmark)

    Hu, Weihao; Su, Chi; Chen, Zhe

    2013-01-01

    in the power systems with high wind power penetrations. In this paper, the integration of plug-in electric vehicles in the power systems with high wind power penetrations is proposed and discussed. Optimal operation strategies of PEV in the spot market are proposed in order to decrease the energy cost for PEV......The Danish power system has a large penetration of wind power. The wind fluctuation causes a high variation in the power generation, which must be balanced by other sources. The battery storage based Plug-In Electric Vehicles (PEV) may be a possible solution to balance the wind power variations...... owners. Furthermore, the application of battery storage based aggregated PEV is analyzed as a regulation services provider in the power system with high wind power penetrations. The western Danish power system where the total share of annual wind power production is more than 27% of the electrical energy...

  4. Thermal power plant operating regimes in future British power systems with increasing variable renewable penetration

    International Nuclear Information System (INIS)

    Edmunds, Ray; Davies, Lloyd; Deane, Paul; Pourkashanian, Mohamed

    2015-01-01

    Highlights: • This work investigates thermal power operating regimes in future power systems. • Gas plants have low utilisation in the scenarios considered. • Ramping intensity increases for gas plants and pumped storage. • Coal plants frequently operate at minimum stable levels and start-ups increase. • Grid emission intensity and total emission production remains substantial. - Abstract: This work investigates the operational requirements of thermal power plants in a number of potential future British power systems with increasing variable renewable penetration. The PLEXOS Integrated Energy Model has been used to develop the market models, with PLEXOS employing mixed integer programming to solve the unit commitment and economic dispatch problem, subject to a number of constraints. Initially, a model of the British power system was developed and validated. Subsequently, a 2020 test model was developed to analyse a number of future system structures with differing fuel and carbon prices and generation mixes. The study has found that in three of the four scenarios considered, the utilisation of gas power plants will be relatively low, but remains fundamental to the security of supply. Also, gas plants will be subject to more intense ramping. The findings have consequent implications for energy policy as expensive government interventions may be required to prevent early decommissioning of gas capacity, should the prevailing market conditions not guarantee revenue adequacy.

  5. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  6. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  7. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-03-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such incidents and observations are described relating to nuclear and radiation safety which the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, considers safety-related. During the third quarter of 1989 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 39.0% of the total Finnish electricity production in this quarter. The load factor average of the nuclear power plant units was 78.9%. At Loviisa 1, two holes were found in the feedwater distributor of one steam generator. Corresponding wall thinning corrosion was also detected in the walls of two other distributors. The holes were found on the feedwater distributor upper surface in the joint of the secondary circuit feedwater pipe. One hole was about 20 mm x 50 mm in size and the other was a pit hole ca 5 mm in diameter. Metal power had entered the primary circuit at TVO I. This was observed during a post-scram plant start-up. Several control rod drive units had become jammed so tight that control rod withdrawal failed. Metal powder did not hamper reactor scram under the prevailing circumstances because the drive units are prone to jamming only after a control rod is almost fully inserted and because the forces which insert a control rod by various means (electrical, hydraulic) are 6-8 fold compared with the withdrawing force

  9. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  10. Application of expert system to nuclear power plant operation and guidance system

    International Nuclear Information System (INIS)

    Goto, M.; Takada, Y.

    1990-01-01

    For a nuclear power plant, it is important that an expert system supplies useful information to the operator to meet the increasing demand for high-level plant operation. It is difficult to build a user-friendly expert system that supplies useful information in real time using existing general-purpose expert system shells. Therefore a domain-specific expert system shell with a useful knowledge representation for problem-solving in nuclear power plant operation was selected. The Plant Table (P/T) representation format was developed for description of a production system for nuclear power plant operation knowledge. The P/T consists of plant condition representation designed to process multiple inputs and single output. A large number of operation inputs for several plant conditions are divided into 'timing conditions', 'preconditions' and 'completion conditions' to facilitate knowledge-base build-up. An expert system for a Nuclear Power Plant Operation and Guidance System utilizing the P/T was developed to assist automatic plant operation and surveillance test operation. In these systems, automatic plant operation signals to the plant equipment and operation guidance messages to the operators are both output based on the processing and assessment of plant operation conditions by the P/T. A surveillance test procedure guide for major safety-related systems, such as those for emergency core cooling systems, is displayed on a CRT (Cathode Ray Tube) and test results are printed out. The expert system for a Nuclear Power Plant Operation and Guidance System has already been successfully applied to Japanese BWR plants

  11. Effect of accuracy of wind power prediction on power system operator

    Science.gov (United States)

    Schlueter, R. A.; Sigari, G.; Costi, T.

    1985-01-01

    This research project proposed a modified unit commitment that schedules connection and disconnection of generating units in response to load. A modified generation control is also proposed that controls steam units under automatic generation control, fast responding diesels, gas turbines and hydro units under a feedforward control, and wind turbine array output under a closed loop array control. This modified generation control and unit commitment require prediction of trend wind power variation one hour ahead and the prediction of error in this trend wind power prediction one half hour ahead. An improved meter for predicting trend wind speed variation is developed. Methods for accurately simulating the wind array power from a limited number of wind speed prediction records was developed. Finally, two methods for predicting the error in the trend wind power prediction were developed. This research provides a foundation for testing and evaluating the modified unit commitment and generation control that was developed to maintain operating reliability at a greatly reduced overall production cost for utilities with wind generation capacity.

  12. Optimization Criteria of Power Transformer Operation

    Directory of Open Access Journals (Sweden)

    A. A. Gonchar

    2006-01-01

    Full Text Available It has been shown that minimum losses in active power of a power transformer do not correspond to its maximum efficiency. For a transformer being operated there are no so called «zones of its economical operation». In this case strictly specified value of active power losses corresponds to a particular current of the winding.

  13. Summary of Operating Experience in Swiss Nuclear Power Plants 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-15

    The five Swiss nuclear power units produced a net total of 23.6 TWh of electricity in 1999 - not as high as the all-time record (24.45 TWh in 1998), but nonetheless a solid operational performance. The nuclear share in overall electricity production was 35.3%, again lower than the previous year's 40%. In general, plant operation in 1999 was practically as undisturbed and as reliable as in 1998, reflecting the ongoing tradition of careful maintenance that contributes so much to keeping the plants in excellent condition. However, due to exceptional outage activities at Beznau 2 (steam generator replacement) and an unplanned shut-down at Goesgen to replace a hydrogen seal on the main generator, 1999 nuclear production could not match that of the previous year. Also, record hydro power production caused the nuclear share in total electricity production to drop. With the exception of Beznau 2, all refueling and maintenance outages were once again short. The Leibstadt outage lasted 26 days, Goesgen 33 days, Beznau 1 lasted 29 days, Beznau 2 89 days and Muehleberg 27 days. At Goesgen, MOX fuel was loaded for the third time in 1999. Of the 44 freshly-loaded fuel elements, 20 were MOX elements. Non-electrical energy supplies from the Beznau and Goesgen nuclear power plants functioned flawlessly. Beznau fed 143.6 GWh of heat energy into the Refuna district heating system, while Goesgen supplied 169 GWh of process heat to the neighboring Niedergoesgen cardboard factory. At the end of 1999 and the beginning of 2000 all Swiss nuclear units continued to operate flawlessly - notwithstanding the challenges posed by the 'Lothar' storm that hit Western Europe in late December and the so-called Y2K computer bug that threatened to hit shortly afterwards, during the 'millennial' change-over. (authors)

  14. Summary of Operating Experience in Swiss Nuclear Power Plants 1999

    International Nuclear Information System (INIS)

    2000-05-01

    The five Swiss nuclear power units produced a net total of 23.6 TWh of electricity in 1999 - not as high as the all-time record (24.45 TWh in 1998), but nonetheless a solid operational performance. The nuclear share in overall electricity production was 35.3%, again lower than the previous year's 40%. In general, plant operation in 1999 was practically as undisturbed and as reliable as in 1998, reflecting the ongoing tradition of careful maintenance that contributes so much to keeping the plants in excellent condition. However, due to exceptional outage activities at Beznau 2 (steam generator replacement) and an unplanned shut-down at Goesgen to replace a hydrogen seal on the main generator, 1999 nuclear production could not match that of the previous year. Also, record hydro power production caused the nuclear share in total electricity production to drop. With the exception of Beznau 2, all refueling and maintenance outages were once again short. The Leibstadt outage lasted 26 days, Goesgen 33 days, Beznau 1 lasted 29 days, Beznau 2 89 days and Muehleberg 27 days. At Goesgen, MOX fuel was loaded for the third time in 1999. Of the 44 freshly-loaded fuel elements, 20 were MOX elements. Non-electrical energy supplies from the Beznau and Goesgen nuclear power plants functioned flawlessly. Beznau fed 143.6 GWh of heat energy into the Refuna district heating system, while Goesgen supplied 169 GWh of process heat to the neighboring Niedergoesgen cardboard factory. At the end of 1999 and the beginning of 2000 all Swiss nuclear units continued to operate flawlessly - notwithstanding the challenges posed by the 'Lothar' storm that hit Western Europe in late December and the so-called Y2K computer bug that threatened to hit shortly afterwards, during the 'millennial' change-over. (authors)

  15. ANALYSIS OF OPTIMUM OPERATING MODES OF POWER TRANSFORMERS UNDER OPERATING CONDITIONS

    Directory of Open Access Journals (Sweden)

    I. V. Khomenko

    2016-12-01

    Full Text Available Purpose. The study of parallel operation optimal modes of transformer equipment for a variety of operating conditions: same or different types of transformers, with or without reactive power flows. Methodology. Losses of energy in transformers make 30 % of all losses. Therefore the choice of the economically justified parallel operation of transformers is effective action to reduce losses. Typically, in the calculations of reactive power flows in the transformers are not taken into account. It is interesting to analyze the optimal operating conditions of transformers with and without reactive power flows. Results. Calculations for transformers in distribution networks showed that the inclusion of reactive power flows in transformers significant impact on the calculated optimum regimes of transformers.

  16. Optimization of wind farm power production using innovative control strategies

    DEFF Research Database (Denmark)

    Duc, Thomas

    Wind energy has experienced a very significant growth and cost reduction over the past decade, and is now able to compete with conventional power generation sources. New concepts are currently investigated to decrease costs of production of electricity even further. Wind farm coordinated control...... deficit caused by the wake downstream, or yawing the turbine to deflect the wake away from the downwind turbine. Simulation results found in the literature indicate that an increase in overall power production can be obtained. However they underline the high sensitivity of these gains to incoming wind...... aligned wind turbines. The experimental results show that the scenarios implemented during the first measurement campaign did not achieve an increase in overall power production, which confirms the difficulty to realize wind farm power optimization in real operating conditions. In the curtailment field...

  17. A new self-scheduling strategy for integrated operation of wind and pumped-storage power plants in power markets

    International Nuclear Information System (INIS)

    Varkani, Ali Karimi; Daraeepour, Ali; Monsef, Hassan

    2011-01-01

    Highlights: → A strategy for integrated operation of wind and pumped-storage plants is proposed. → Participation of both plants in energy and ancillary service markets is modeled. → The uncertainty of wind production is modeled by a novel probabilistic function. → The proposed strategy is tested on a real case in the Spanish electricity market. -- Abstract: Competitive structure of power markets causes various challenges for wind resources to participate in these markets. Indeed, production uncertainty is the main cause of their low income. Thus, they are usually supported by system operators, which is in contrast with the competitive paradigm of power markets. In this paper, a new strategy for increasing the profits of wind resources is proposed. In the suggested strategy, a Generation Company (GenCo), who owns both wind and pumped-storage plants, self-schedules the integrated operation of them regarding the uncertainty of wind power generation. For presenting an integrated self-schedule and obtaining a real added value of the strategy, participation of the GenCo in energy and ancillary service markets is modeled. The self-scheduling strategy is based on stochastic programming techniques. Outputs of the problem include generation offers in day-ahead energy market and ancillary service markets, including spinning and regulation reserve markets. A Neural Network (NN) based technique is used for modeling the uncertainty of wind power production. The proposed strategy is tested on a real wind farm in mainland, Spain. Moreover, added value of the strategy is presented in different conditions of the market.

  18. An advanced control system for the optimal operation and management of medium size power systems with a large penetration from renewable power sources

    Energy Technology Data Exchange (ETDEWEB)

    Nogaret, E.; Stavrakakis, G.; Kariniotakis, G. [Ecole de Mines de Paris, Centre d`Energetique, Sophia-Antipolis (France)] [and others

    1997-10-01

    An advanced control system for the optimal operation and management of autonomous wind-diesel systems is presented. This system minimises the production costs through an on-line optimal scheduling of the power units, which takes into account the technical constraints of the diesel units, as well as short-term forecasts of the load and renewable resources. The power system security is maximised through on-line security assessment modules, which enable the power system to withstand sudden changes in the production of the renewable sources. The control system was evaluated using data from the island of Lemnos, where it has been installed and operated since January 1995. (Author)

  19. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-01-01

    This general review of the operation of the Finnish nuclear power plants in the second quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and availability of the plants. (author)

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-05-01

    This general review of the operation of the Finnish nuclear power plants in the third quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  1. Power grid operation risk management: V2G deployment for sustainable development

    Science.gov (United States)

    Haddadian, Ghazale J.

    The production, transmission, and delivery of cost--efficient energy to supply ever-increasing peak loads along with a quest for developing a low-carbon economy require significant evolutions in the power grid operations. Lower prices of vast natural gas resources in the United States, Fukushima nuclear disaster, higher and more intense energy consumptions in China and India, issues related to energy security, and recent Middle East conflicts, have urged decisions makers throughout the world to look into other means of generating electricity locally. As the world look to combat climate changes, a shift from carbon-based fuels to non-carbon based fuels is inevitable. However, the variability of distributed generation assets in the electricity grid has introduced major reliability challenges for power grid operators. While spearheading sustainable and reliable power grid operations, this dissertation develops a multi-stakeholder approach to power grid operation design; aiming to address economic, security, and environmental challenges of the constrained electricity generation. It investigates the role of Electric Vehicle (EV) fleets integration, as distributed and mobile storage assets to support high penetrations of renewable energy sources, in the power grid. The vehicle-to-grid (V2G) concept is considered to demonstrate the bidirectional role of EV fleets both as a provider and consumer of energy in securing a sustainable power grid operation. The proposed optimization modeling is the application of Mixed-Integer Linear Programing (MILP) to large-scale systems to solve the hourly security-constrained unit commitment (SCUC) -- an optimal scheduling concept in the economic operation of electric power systems. The Monte Carlo scenario-based approach is utilized to evaluate different scenarios concerning the uncertainties in the operation of power grid system. Further, in order to expedite the real-time solution of the proposed approach for large-scale power systems

  2. Power technology complex for production of motor fuel from brown coals with power supply from NPPs

    International Nuclear Information System (INIS)

    Troyanov, M.F.; Poplavskij, V.M.; Sidorov, G.I.; Bondarenko, A.V.; Chebeskov, A.N.; Chushkin, V.N.; Karabash, A.A.; Krichko, A.A.; Maloletnev, A.S.

    1998-01-01

    With the present-day challenge of efficient use of low-grade coals and current restructuring of coal industry in the Russian Federation, it is urgent to organise the motor fuel production by the synthesis from low grade coals and heavy petroleum residues. With this objective in view, the Institute of Physics and Power Engineering of RF Minatom and Combustible Resources Institute of RF Mintopenergo proposed a project of a standard nuclear power technology complex for synthetic liquid fuel (SLF) production using fast neutron reactors for power supply. The proposed project has two main objectives: (1) Engineering and economical optimization of the nuclear power supply for SLF production; and (2) Engineering and economical optimization of the SLF production by hydrogenisation of brown coals and heavy petroleum residues with a complex development of advanced coal chemistry. As a first approach, a scheme is proposed with the use of existing reactor cooling equipment, in particular, steam generators of BN-600, limiting the effect on safety of reactor facility operation at minimum in case of deviations and abnormalities in the operation of technological complex. The possibility to exclude additional requirements to the equipment for nuclear facility cooling was also taken into account. It was proposed to use an intermediate steam-water circuit between the secondary circuit sodium and the coolant to heat the technological equipment. The only change required for the BN-600 equipment will be the replacement of sections of intermediate steam superheaters at the section of main steam superheaters. The economic aspects of synthetic motor fuel production proposed by the joint project depend on the evaluation of integral balances: thermal power engineering, chemical technology, the development of advanced large scale coal chemistry of high profitability; utilisation of ash and precious microelements in waste-free technology; production of valuable isotopes; radical solution of

  3. Operational characteristics of nuclear power plants - modelling of operational safety

    International Nuclear Information System (INIS)

    Studovic, M.

    1984-01-01

    By operational experience of nuclear power plants and realize dlevel of availability of plant, systems and componenst reliabiliuty, operational safety and public protection, as a source on nature of distrurbances in power plant systems and lessons drawn by the TMI-2, in th epaper are discussed: examination of design safety for ultimate ensuring of safe operational conditions of the nuclear power plant; significance of the adequate action for keeping proess parameters in prescribed limits and reactor cooling rquirements; developed systems for measurements detection and monitoring all critical parameters in the nuclear steam supply system; contents of theoretical investigation and mathematical modeling of the physical phenomena and process in nuclear power plant system and components as software, supporting for ensuring of operational safety and new access in staff education process; program and progress of the investigation of some physical phenomena and mathematical modeling of nuclear plant transients, prepared at faculty of mechanical Engineering in Belgrade. (author)

  4. Interconnection and power transportation networks: operation; Reseaux d'interconnexion et de transport: fonctionnement

    Energy Technology Data Exchange (ETDEWEB)

    Bornard, P. [Reseau de Transport d' Electricite (RTE), Div. Systeme Electrique, 92 - Paris la Defense (France); Pavard, M. [Electricite de France (EDF), 75 - Paris (France); Testud, G. [Reseau de Transport d' Electricite (RTE), Dept. Exploitation du Systeme Electrique, 92 - Paris la Defense (France)

    2005-10-01

    For economical or technical reasons, the power generation units are in general grouped together in the same geographical areas, while the consumption points are much more dispersed. The power transportation and interconnection networks ensure the link between the big generation areas and the big consumption areas, and also with other foreign networks. The network manager must keep the balance between the available offer and the potential demand and ensures the transit of energy between the production units and the end-users with respecting the contractual voltage and frequency ranges. Incidents must be mastered to limit the inconvenience to users and to avoid the complete collapse of the power transportation system. This article describes the operation of such systems: 1 - problems linked with networks operation; 2 - transits distribution: general problem, transmissible power in a power line, voltage drop, calculations of power distributions; 3 - voltage and frequency adjustments; 4 - operation in disturbed regime: mastery of common incidents, mechanisms of major incidents (operation of a power system in strongly disturbed regime), protection of the power system, recovery; 5 - conclusion. (J.S.)

  5. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  6. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  7. Supervision functions - Secure operation of sustainable power systems

    DEFF Research Database (Denmark)

    Morais, Hugo; Zhang, Xinxin; Lind, Morten

    2013-01-01

    of power systems operation control. The use of PMUs allows more penetration of DG mainly, with technologies based on renewable resources with intermittent and unpredictable operation such a wind power. This paper introduces the Secure Operation of Sustainable Power Systems (SOSPO) project. The SOSPO...... project tries to respond to the question "How to ensure a secure operation of the future power system where the operating point is heavily is fluctuating?" focusing in the Supervision module architecture and in the power system operation states. The main goal of Supervision module is to determine...... the power system operation state based on new stability and security parameters derived from PMUs measurement and coordinate the use of automatic and manual control actions. The coordination of the control action is based not only in the static indicators but also in the performance evaluation of control...

  8. Information needs in nuclear power plants during low power operation modes

    Energy Technology Data Exchange (ETDEWEB)

    Tommila, Teemu; Fantoni, Paolo F.; Zander, Ralf M.

    1998-02-01

    During the past few years an increasing attention has been paid to the safety of shutdown and refuelling operations. It has turned out that the risks during shutdown may be comparable to the risks of power operation. The goal of this report is to identify information requirements related to low power operating modes of nuclear power plants. These include, for example, warm and cold shutdowns, refuelling and maintenance, as well as related state transitions such as start-up and shut-down. The focus of the report is on planned refuelling outages and the role of the control room in managing the outage activities. As a starting point, the basic terminology and characteristics of low power operation are discussed. The current situation at nuclear power plants and some recent developments in information technology are reviewed. End-users' requirements and enabling technologies are combined in order to identify the opportunities for new information technology tools in low power operation. The required features of process control systems and maintenance information systems are described. Common plant modelling techniques, open software architectures and functional structuring of the process control system are suggested to be the key issues in the long-term development of operator support systems. On a shorter time scale, new tools solving limited practical problems should be developed and evaluated. This would provide a basis for the features needed for low power operation, including for example, outage planning, on-line risk monitoring, management of outage tasks, adaptive alarm handling, computerised procedures and task-oriented human interfaces. (author)

  9. Operational experiences of the spallation neutron source superconducting linac and power ramp-up

    International Nuclear Information System (INIS)

    Kim, Sang-Ho

    2009-01-01

    The spallation neutron source (SNS) is a second generation pulsed neutron source and designed to provide a 1-GeV, 1.44-MW proton beam to a mercury target for neutron production. Since the commissioning of the accelerator complex in 2006, the SNS has started its operation for neutron production and beam power ramp-up has been in progress toward the design goal. All subsystems of the SNS were designed and developed for substantial improvements compared to existing accelerators because the design beam power is almost an order of magnitude higher compared to existing neutron facilities and the achievable neutron scattering performance will exceed present sources by more than a factor of 20 to 100. In this paper, the operational experiences with the SNS Superconducting Linac (SCL), Power Ramp-up Plan to reach the design goal and the Power Upgrade Plan (PUP) will be presented including machine, subsystem and beam related issues.

  10. The resilience of an operating point for a fusion power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David, E-mail: david.ward@ccfe.ac.uk; Kemp, Richard

    2015-10-15

    Highlights: • The need to control a power plant changes our view of the optimum design. • The need for control can be reduced by finding resilient design points. • It is important to include resilience and control in selecting design points. • Including these additional constraints reduces flexibility in choice of operating points. - Abstract: The operating point for fusion power plant design concepts is often determined by simultaneously satisfying the requirements of all of the main plant systems and finding an optimum solution, for instance the one with the lowest capital cost or cost of electricity. This static assessment takes no account of the sensitivity of that operating point to variations in key parameters and therefore includes no information about how difficult to adjust and control the chosen operating point may be. Control of the operation point is a large subject with much work still to be done, and is expected to play an increasing role in the future in choosing the optimum design point. Here we present results of two analyses: one relates to the ability to load follow, that is, to vary the power production in the light of varying demands for power from the electricity network; the other investigates in simple terms what choices we can make to improve the resilience of static operating points.

  11. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  12. Operation status display and monitoring system for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Wakabayashi, Yasuo; Hayakawa, Hiroyasu; Kawamura, Atsuo; Kaneda, Mitsunori.

    1982-01-01

    Lately, the development of the system has been made for BWR plants, which monitors the operating status not only in normal operation but also in abnormal state and also for plant safety. Recently, the improvement of man-machine interface has been tried through the practical use of technique which displays data collectively on a CRT screen relating them mutually. As one of those results, the practical use of an electronic computer and color CRT display for No. 1 unit in the Fukushima No. 2 Nuclear Power Station (2F-1), Tokyo Electric Power Co., is described. Also, new centralized control panels containing such systems were used for the 1100 MWe BWR nuclear power plants now under construction, No. 3 unit of the Fukushima No. 2 Power Station and No. 1 unit of Kashiwazaki-Kariwa Nuclear Power Station (2F-3 and K-1, respectively). The display and monitoring system in 2F-1 plant is the first one in which a computer and color CRTs were practically employed for a BWR plant in Japan, and already in commercial operation. The advanced operating status monitoring system, to which the result of evaluation of the above system was added, was incorporated in the new centralized control panels presently under production for 2F-3 and K-1 plants. The outline of the system, the functions of an electronic computer, plant operating status monitor, surveillance test guide, the automation of plant operation and auxiliary operation guide are reported for these advanced monitoring system. It was confirmed that these systems are useful means to improve the man-machine communication for plant operation minitoring. (Wakatsuki, Y.)

  13. Development and application of nuclear power operation database

    International Nuclear Information System (INIS)

    Shao Juying; Fang Zhaoxia

    1996-01-01

    The article describes the development of the Nuclear Power Operation Database which include Domestic and Overseas Nuclear Event Scale Database, Overseas Nuclear Power Operation Abnormal Event Database, Overseas Nuclear Power Operation General Reliability Database and Qinshan Nuclear Power Operation Abnormal Event Database. The development includes data collection and analysis, database construction and code design, database management system selection. The application of the database to provide support to the safety analysis of the NPPs which have been in commercial operation is also introduced

  14. Variable Frequency Operations of an Offshore Wind Power Plant with HVDC-VSC: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Singh, M.; Muljadi, E.

    2011-12-01

    In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated. Based on DOE study, wind power generation may reach 330 GW by 2030 at the level of penetration of 20% of the total energy production. From this amount of wind power, 54 GW of wind power will be generated at offshore wind power plants. The deployment of offshore wind power plants requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cable, there is a need to use High-Voltage Direct Current (HVDC) transmission. Otherwise, if the power is transmitted via alternating current, the reactive power generated by the cable capacitance may cause an excessive over voltage in the middle of the transmission distance which requires unnecessary oversized cable voltage breakdown capability. The use of HVDC is usually required for transmission distance longer than 50 kilometers of submarine cables to be economical. The use of HVDC brings another advantage; it is capable of operating at variable frequency. The inland substation will be operated to 60 Hz synched with the grid, the offshore substation can be operated at variable frequency, thus allowing the wind power plant to be operated at constant Volt/Hz. In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.

  15. Performance management for nuclear power plant operators

    International Nuclear Information System (INIS)

    Fan Pengfei

    2014-01-01

    Fuel was loaded to Unit 3 of the second power plant in May 2010. The Second Operation Division stepped in the operation stage from production preparation and commissioning and exploration of performance management was started. By means of performance evaluation, a closed loop of performance management was formed, staff enthusiasm improved, and potential capability inspired through evaluation, analysis and improvement. The performance evaluation covers attitude, skill, efficiency, performance, teamwork sense, cooperation, etc. Quantitative appraisal was carried out through 31 objective indicators of the working process and results. According to the evaluation results and personal interviews, indicators were modified. Through the performance evaluation, positive guidance is provided to the employees to promote the development of employees, departments and the enterprise. (authors)

  16. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  17. Operating Experience with Nuclear Power Stations in Member States. 2016 Edition (CD-ROM)

    International Nuclear Information System (INIS)

    2016-06-01

    This CD-ROM contains the 47th edition of the IAEA’s series of annual reports on operating experience with nuclear power plants in Member States. It is a direct output from the IAEA’s Power Reactor Information System (PRIS) and contains information on electricity production and overall performance of individual plants during 2015. In addition to annual information, the report contains a historical summary of performance during the lifetime of individual plants and figures illustrating worldwide performance of the nuclear industry. The CD-ROM contains also an overview of design characteristics and dashboards of all operating nuclear power plants worldwide

  18. Operator support system for nuclear power plants

    International Nuclear Information System (INIS)

    Mori, Nobuyuki; Tai, Ichiro; Sudo, Osamu; Naito, Norio.

    1987-01-01

    The nuclear power generation in Japan maintains the high capacity factor, and its proportion taken in the total generated electric power exceeded 1/4, thus it has become the indispensable energy source. Recently moreover, the nuclear power plants which are harmonious with operators and easy to operate are demanded. For realizing this, the technical development such as the heightening of operation watching performance, the adoption of automation, and the improvement of various man-machine systems for reducing the burden of operators has been advanced by utilizing electronic techniques. In this paper, the trend of the man-machine systems in nuclear power plants, the positioning of operation support system, the support in the aspects of information, action and knowledge, the example of a new central control board, the operation support system using a computer, an operation support expert system and the problems hereafter are described. As the development of the man-machine system in nuclear power plants, the upgrading from a present new central control board system PODIA through A-PODIA, in which the operational function to deal with various phenomena arising in plants and safety control function are added, to 1-PODIA, in which knowledge engineering technology is adopted, is expected. (Kako, I.)

  19. Overview of Maximum Power Point Tracking Techniques for Photovoltaic Energy Production Systems

    DEFF Research Database (Denmark)

    Koutroulis, Eftichios; Blaabjerg, Frede

    2015-01-01

    A substantial growth of the installed photovoltaic systems capacity has occurred around the world during the last decade, thus enhancing the availability of electric energy in an environmentally friendly way. The maximum power point tracking technique enables maximization of the energy production...... of photovoltaic sources during stochastically varying solar irradiation and ambient temperature conditions. Thus, the overall efficiency of the photovoltaic energy production system is increased. Numerous techniques have been presented during the last decade for implementing the maximum power point tracking...... process in a photovoltaic system. This article provides an overview of the operating principles of these techniques, which are suited for either uniform or non-uniform solar irradiation conditions. The operational characteristics and implementation requirements of these maximum power point tracking...

  20. Shiraz solar power plant operation with steam engine

    International Nuclear Information System (INIS)

    Yaghoubi, M.; Azizian, K.

    2004-01-01

    The present industrial developments and daily growing need of energy, as well as economical and environmental problem caused by fossil fuels consumption, resulted certain constraint for the future demand of energy. During the past two decades great attention has been made to use renewable energy for different sectors. In this regard for the first time in Iran, design and construction of a 250 K W Solar power plant in Shiraz, Iran is being carried out and it will go to operation within next year. The important elements of this power plant is an oil cycle and a steam cycle, and several studies have been done about design and operation of this power plant, both for steady state and transient conditions. For the steam cycle, initially a steam turbine was chosen and due to certain limitation it has been replaced by a steam engine. The steam engine is able to produce electricity with hot or saturated vapor at different pressures and temperatures. In this article, the effects of installing a steam engine and changing its vapor inlet pressure and also the effects of sending hot or saturated vapor to generate electricity are studied. Various cycle performance and daily electricity production are determined. The effects of oil cycle temperature on the collector field efficiency, and daily, monthly and annual amount of electricity production is calculated. Results are compared with the steam cycle output when it contains a steam turbine. It is found that with a steam engine it is possible to produce more annual electricity for certain conditions

  1. Operating reliability of valves in French pressurized water nuclear power plants

    International Nuclear Information System (INIS)

    Conte

    1986-10-01

    Taking into account the large numbers of valves (about 10000) of a PWR nuclear power plant, the importance of some valves in the safety functions and the cost resulting from their unavailability, the individual operability of these equipments has to be ensured at a high reliability level. This assurance can be obtained by means of an effort at all the stages which contribute to the quality of the product: design, qualification tests, fabrication, tests at the start-up stage, maintenance and tests during the power plant operation, experience feedback. This paper emphasizes more particularly on the tests carried out on loops of qualification [fr

  2. Model based fleet optimisation and master control of a power production system

    International Nuclear Information System (INIS)

    Joergensen, C.; Mortensen, J.H.; Nielsen, E.O.; Moelbak, T.

    2006-01-01

    This paper discussed an optimization concept for power plants operated by the Danish power company Elsam. The power company operates a distributed power production system with fossil fuel thermal plants, biomass-fired thermal plants, waste incineration plants, on- and offshore wind power, and district heating storage units. Power and regulation power are traded on an hourly basis, while trading of district heating resources is conducted using bilateral contracts. System and plant level case studies on optimization and control were presented. A system control level was developed to ensure compliance with power market requirements. Dynamic constraints were posed by environmental regulations, grid capabilities, and fuel and district heating contracts. System components included a short-term load scheduler; a power controller; a frequency control scheduler; a marginal cost calculator; and a master control. The scheduler consisted of an optimization algorithm and a set of steady-state models designed to minimize fuel, load, and maintenance costs. Quadratic programming and mixed integer programming methods were used to minimize deviations between the total electrical power production reference value and actual power production values. The study showed that control levels can be optimized using advanced modelling and control methods. However, integration and coordination between the various levels is needed to obtain improved performance. It was concluded that a bottom-up approach starting at the lowest possible level can ensure the performance of an optimization scheme. 6 refs., 9 figs

  3. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Science.gov (United States)

    2010-07-01

    ... Commanders will develop, in coordination with their respective power marketing agency, a system for exchanging operating information. The system will include general operating information and information on... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters...

  4. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  5. Total-system expertise in economically efficient operation of nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    Siemens Nuclear Power GmbH can look back on well over 40 years of experience in developing and constructing nuclear power plants. 23 Power plant units of Siemens design are in operation in five countries, and in autumn this year, another one will start commercial operation, while yet another one is under construction. In comparative international power plant surveys, the Siemens-design systems usually rank in top positions when it comes to comparing systems availability and electric power generation, and Siemens have build a reputation in manufacturing power plants up to the highest safety standards worldwide. Our experience as a manufacturer of turnkey PWR and BWR type reactors, as well as our profound knowledge of international nuclear standardisation, engineering codes and safety guides, has been used and processed to the benefit of the services offered by Siemens, resulting in well-devised service packages, and enhancements and optimisation of our machinery and equipment. Siemens has of course obtained the relevant licenses and certification for all its services and products according to DIN ISO 9001, KTA and ASME standards [de

  6. Role of check operators in achieving operational excellence at Virginia Power's nuclear stations

    International Nuclear Information System (INIS)

    Shriver, B.L.; Williams, T.M.; Stewart, W.L.

    1987-01-01

    Virginia Power has implemented a Check Operator Program as a part of its commitment to excellence in the operation of the North Anna and Surry nuclear power stations. The Check Operator Program utilizes highly qualified licensed personnel to independently evaluate the performance of licensed operators and senior operators during normal, abnormal and simulated emergency conditions. Emphasis is placed upon individual and team performance as well as the procedures and training which support the operators. The check operators report to line management to ensure that their recommendations are implemented into the overall operations philosophy of the power station

  7. Management quality in spanish nuclear power plant operation

    International Nuclear Information System (INIS)

    Perez de Zabalza Ramos, F.

    1995-01-01

    This paper analyzes the reasons that lead nuclear power plants to require engineering support that is not usual in other types of industrial installations, namely the complexity of the plant and the economic consequences of a possible shutdown. At the time of unit startup, the need to use the services of experienced engineers for the technical support of nuclear power plants induced plant owners to turn to the engineering companies which had participated in the design of the plants. The paper lists the wide range of plant support services which these engineering companies can provide, both from their central offices and on site, especially in the field of change orders and documentation update. The paper also describes the satisfactory development of management parameters in Spanish nuclear power plants both in terms of load factor and comparison of operating and maintenance costs, and how engineering companies have contributed to this achievement, by reducing costs with no loss in the technical quality of their services. Finally, the paper describes how the engineering companies have had to adapt to a shrinking market without losing quality and how they achieved this by diversifying their services. In this context there are two areas of concern. the first area of concern is the competition from certain companies with oversized staff, who attempt to employ them in operation support for nuclear power stations, a field which does not correspond to the training and background of said staff. This could lead to a loss of quality or economic efficiency of nuclear power plants, whose operation up to now has proven satisfactory. The second area of concern is the operator's tendency to use their own resources for engineering support, making more difficult the renewal of human resources and thus leading to a decrease in productivity, and in the transfer of practical and theoretical experience from one plant to another, as well as in the transmission of the latest know

  8. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  9. The human factor and organization to support nuclear power plant operators

    International Nuclear Information System (INIS)

    Naumov, V.I.

    1993-01-01

    Analysis reveals three basic factors which affect the safety of nuclear power reactors: (1) Internal physical properties of the reactor which provide self protection under breakdown and accident conditions; (2) The reliability of technical systems which provide monitoring, control, accident prevention, heat release, and localization of hazardous products during accidents; (3) Reliability of the reactor control personnel. The last of these factors is usually called the human factor. From published data, this factor makes a large contribution to the downtime and accident statistics at nuclear power plants: from 30 to 80% in various countries. Today the importance of the human factor in operating a nuclear power units is rather well recognized. Current ideas on how to increase the reliability of a human operator are reflected in IAEA recommendations and domestic official documents. The concept of 'a culture of safety' is introduced. Basic types of actions to increase the reliability of personnel who control a nuclear reactor are discussed, including: (1) The qualifying and psychological selection and the training of candidates on the operator's obligations. (2) The automation of routine operations which do not require the operator's intellect. (3) Perfecting the work place, information input to the operator, and the organization of the controls

  10. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  11. Integrated control centre: Trading system for operation in a deregulated power market

    International Nuclear Information System (INIS)

    Nyland, S.; Reinertsen, T.; Gunnestad, J.; Botnan, G.O.

    1995-01-01

    The paper presents a trade system for operation in a deregulated power market. The trade system (ICC-Trade) is one of the application programs in the Integrated Control Centre (ICC). The Norwegian deregulated power market is briefly described in order to discuss the consequences of the new power market for the power utilities. The paper will also deal with the interconnection to other ICC application programs and how to make use of the communication with SCADA systems for support of managing market activities. Finally some future developments are presented. The trade system is developed in cooperation between a research institute, vendors of control centres, and power utilities, and is planned to be a commercial product during the spring of 1995. Before release the product will be tested in real life by a pilot customer. 4 figs

  12. Methods for planning and operating decentralized combined heat and power plants

    Energy Technology Data Exchange (ETDEWEB)

    Palsson, H.

    2000-02-01

    In recent years, the number of decentralized combined heat and power (DCHP) plants, which are typically located in small communities, has grown rapidly. These relatively small plants are based on Danish energy resources, mainly natural gas, and constitute an increasing part of the total energy production in Denmark. The topic of this thesis is the analysis of DCHP plants, with the purpose to optimize the operation of such plants. This involves the modelling of district heating systems, which are frequently connected to DCHP plants, as well as the use of heat storage for balancing between heat and power production. Furthermore, the accumulated effect from increasing number of DCHP plants on the total power production is considered. Methods for calculating dynamic temperature response in district heating (DH) pipes have been reviewed and analyzed numerically. Furthermore, it has been shown that a tree-structured DH network consisting of about one thousand pipes can be reduced to a simple chain structure of ten equivalent pipes without loosing much accuracy when temperature dynamics are calculated. A computationally efficient optimization method based on stochastic dynamic programming has been designed to find an optimum start-stop strategy for a DCHP plant with a heat storage. The method focuses on how to utilize heat storage in connection with CHP production. A model for the total power production in Eastern Denmark has been applied to the accumulated DCHP production. Probability production simulations have been extended from the traditional power-only analysis to include one or several heat supply areas. (au)

  13. Operating Experience with Nuclear Power Stations in Member States in 2011. 2012 Edition (CD-ROM)

    International Nuclear Information System (INIS)

    2012-08-01

    This CD contains the 43rd edition of the IAEA's series of annual reports on operating experience with nuclear power plants in Member States. It is a direct output from the IAEA's Power Reactor Information System (PRIS) and contains information on electricity production and overall performance of individual operational plants during 2011. In addition to annual information, the report contains a historical summary of performance during the lifetime of individual plants and figures illustrating worldwide performance of the nuclear industry. The CD contains also an overview of design characteristics and dashboards of all operating nuclear power plants worldwide.

  14. Permanent cessation of Tokai power plant's operation

    International Nuclear Information System (INIS)

    Satoh, T.

    1998-01-01

    Tokai power plant (166MWe, Magnox type: GCR) is the first commercial reactor in Japan and has been kept operating stable since its commissioning in July 1996. During this period it has produced electricity of approximately 27.7 billion KWh (as of March 1997) and its stable operation has contributed greatly to the stable supply of electricity in Japan. Furthermore, technologies in various fields have been developed, demonstrated and accumulated through the construction and operation of Tokai power plant. It also contributes to training for many nuclear engineers, and constructions and operations of nuclear power stations by other Japanese power companies. As a pioneer, it has been achieved to develop and popularize Japanese nuclear power generation. On the other hand, Tokai power plant has small capacity in its electric power output, even though the size of the reactor and heat exchangers are rather bigger than those of LWR due to the characteristics of GCR. Therefore, the generation cost is higher than the LWR. Since there is no plant whose reactor type is the same as that of Tokai power plant, the costs for maintenance and fuel cycle are relatively higher than that of LWR. Finally we concluded that the longer we operate it, the less we can take advantage of it economically. As a result of the evaluation for the future operation of Tokai power plant including the current status for supply of electricity by the Japanese utilities and study of decommissioning by Japanese government, we decided to have a plan of stopping its commercial operation of Tokai power plant in the end of March, 1998, when we completely consume its fuel that we possess. From now on, we set about performing necessary studies and researches on the field of plant characterization, remote-cutting, waste disposal for carrying out the decommissioning of Tokai power plant safely and economically. We are going to prepare the decommissioning planning for Tokai power plant in a few years based on the

  15. Production price of hydrogen from grid connected electrolysis in a power market with high wind penetration

    International Nuclear Information System (INIS)

    Joergensen, Claus; Ropenus, Stephanie

    2008-01-01

    In liberalized power markets, there are significant power price fluctuations due to independently varying changes in demand and supply, the latter being substantial in systems with high wind power penetration. In such systems, hydrogen production by grid connected electrolysis can be cost optimized by operating an electrolyzer part time. This paper presents a study on the minimization of the hydrogen production price and its dependence on estimated power price fluctuations. The calculation of power price fluctuations is based on a parameterization of existing data on wind power production, power consumption and power price evolution in the West Danish power market area. The price for hydrogen is derived as a function of the optimal electrolyzer operation hours per year for four different wind penetration scenarios. It is found to amount to 0.41-0.45 EUR/Nm 3 . The study further discusses the hydrogen price sensitivity towards investment costs and the contribution from non-wind power sources. (author)

  16. Production price of hydrogen from grid connected electrolysis in a power market with high wind penetration

    Energy Technology Data Exchange (ETDEWEB)

    Joergensen, Claus [Materials Research Department, Risoe National Laboratory for Sustainable Energy, Technical University of Denmark, P.O. Box 49, Frederiksborgvej 399, DK-4000 Roskilde (Denmark); Ropenus, Stephanie [Systems Analysis Department, Risoe National Laboratory for Sustainable Energy, Technical University of Denmark, P.O. Box 49, Frederiksborgvej 399, DK-4000 Roskilde (Denmark)

    2008-10-15

    In liberalized power markets, there are significant power price fluctuations due to independently varying changes in demand and supply, the latter being substantial in systems with high wind power penetration. In such systems, hydrogen production by grid connected electrolysis can be cost optimized by operating an electrolyzer part time. This paper presents a study on the minimization of the hydrogen production price and its dependence on estimated power price fluctuations. The calculation of power price fluctuations is based on a parameterization of existing data on wind power production, power consumption and power price evolution in the West Danish power market area. The price for hydrogen is derived as a function of the optimal electrolyzer operation hours per year for four different wind penetration scenarios. It is found to amount to 0.41-0.45 EUR/Nm{sup 3}. The study further discusses the hydrogen price sensitivity towards investment costs and the contribution from non-wind power sources. (author)

  17. Production price of hydrogen from grid connected electrolysis in a power market with high wind penetration.

    Energy Technology Data Exchange (ETDEWEB)

    Joergensen, Claus [Materials Research Department, Risoe National Laboratory for Sustainable Energy, Technical University of Denmark, P.O. Box 49, Frederiksborgvej 399, DK-4000 Roskilde (Denmark); Ropenus, Stephanie [Systems Analysis Department, Risoe National Laboratory for Sustainable Energy, Technical University of Denmark, P.O. Box 49, Frederiksborgvej 399, DK-4000 Roskilde (Denmark)

    2008-10-15

    In liberalized power markets, there are significant power price fluctuations due to independently varying changes in demand and supply, the latter being substantial in systems with high wind power penetration. In such systems, hydrogen production by grid connected electrolysis can be cost optimized by operating an electrolyzer part time. This paper presents a study on the minimization of the hydrogen production price and its dependence on estimated power price fluctuations. The calculation of power price fluctuations is based on a parameterization of existing data on wind power production, power consumption and power price evolution in the West Danish power market area. The price for hydrogen is derived as a function of the optimal electrolyzer operation hours per year for four different wind penetration scenarios. It is found to amount to 0.41-0.45 EUR/Nm{sup 3}. The study further discusses the hydrogen price sensitivity towards investment costs and the contribution from non-wind power sources. (author)

  18. What about improving the productivity of electric power plants

    International Nuclear Information System (INIS)

    Lawroski, H.; Knecht, P.D.; Prideaux, D.L.; Zahner, R.R.

    1976-01-01

    The FEA in April of 1974 established an Interagency Task Group on Power Plant Reliability, which was charged with the broad objective of improving the productivity of existing and planned large fossil-fueled and nuclear power plants. It took approximately 11 months for the task force to publish a report, ''Report on Improving the Productivity of Electrical Power Plants'' (FEA-263-G), a detailed analysis and comparison of successful and below-average-performance power plants. The Nuclear Service Corp. portion of this study examined four large central-station power plants: two fossil (coal) and two nuclear plants. Only plants with electrical generation capacities greater than 400 MWe were considered. The study included the following: staff technical skill, engineering support, QA program, plant/corporate coordination, operation philosophy, maintenance programs, federal/state regulations, network control, and equipment problems. Personnel were interviewed, and checklists providing input from some 21 or more plant and corporate personnel of each utility were utilized. Reports and other documentation were also reviewed. It was recognized early that productivity is closely allied to technical skills and positive motivation. For this reason, considerable attention was given to people in this study

  19. Nucleon structure functions from lattice operator product expansion

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, A.J.; Somfleth, K.; Young, R.D.; Zanotti, J.M. [Adelaide Univ., SA (Australia). CSSM, Dept. of Physics; Horsley, R. [Edinburgh Univ. (United Kingdom). School of Physics and Astronomy; Nakamura, Y. [RIKEN Advanced Institute for Computational Science, Kobe (Japan); Perlt, H.; Schiller, A. [Leipzig Univ. (Germany). Inst. fuer Theoretische Physik; Rakow, P.E.L. [Liverpool Univ. (United Kingdom). Theoretical Physics Div.; Schierholz, G. [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany)

    2017-03-15

    Deep-inelastic scattering, in the laboratory and on the lattice, is most instructive for understanding how the nucleon is built from quarks and gluons. The long-term goal is to compute the associated structure functions from first principles. So far this has been limited to model calculations. In this Letter we propose a new method to compute the structure functions directly from the virtual, all-encompassing Compton amplitude, utilizing the operator product expansion. This overcomes issues of renormalization and operator mixing, which so far have hindered lattice calculations of power corrections and higher moments.

  20. Nucleon structure functions from lattice operator product expansion

    International Nuclear Information System (INIS)

    Chambers, A.J.; Somfleth, K.; Young, R.D.; Zanotti, J.M.; Perlt, H.; Schiller, A.

    2017-03-01

    Deep-inelastic scattering, in the laboratory and on the lattice, is most instructive for understanding how the nucleon is built from quarks and gluons. The long-term goal is to compute the associated structure functions from first principles. So far this has been limited to model calculations. In this Letter we propose a new method to compute the structure functions directly from the virtual, all-encompassing Compton amplitude, utilizing the operator product expansion. This overcomes issues of renormalization and operator mixing, which so far have hindered lattice calculations of power corrections and higher moments.

  1. Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

    Energy Technology Data Exchange (ETDEWEB)

    Diakov, Victor [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sullivan, Patrick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

  2. Entropic cohering power in quantum operations

    Science.gov (United States)

    Xi, Zhengjun; Hu, Ming-Liang; Li, Yongming; Fan, Heng

    2018-02-01

    Coherence is a basic feature of quantum systems and a common necessary condition for quantum correlations. It is also an important physical resource in quantum information processing. In this paper, using relative entropy, we consider a more general definition of the cohering power of quantum operations. First, we calculate the cohering power of unitary quantum operations and show that the amount of distributed coherence caused by non-unitary quantum operations cannot exceed the quantum-incoherent relative entropy between system of interest and its environment. We then find that the difference between the distributed coherence and the cohering power is larger than the quantum-incoherent relative entropy. As an application, we consider the distributed coherence caused by purification.

  3. Operating experience from Swedish nuclear power plants 2003

    International Nuclear Information System (INIS)

    2004-01-01

    In safety terms, operations of the Swedish nuclear power plants in 2003 can be summarized as having ben good, with a few exceptions: The thermal mixer problem at Barsebaeck-2; The Highest Permissible Limit Value excursion at OKG-3, which subjected the reactor pressure vessel to a too rapid temperature change; and An INES class 1 incident at Ringhals-1. The Barsebaeck and Ringhals events were not of such seriousness as to represent a threat to reactor safety, but they both had the effect of causing the Nuclear Power Inspectorate to question safety cultures at the plants. The mixer event resulted in a considerable production loss, with the reactor being shut down twice, making a total of five months. OKG-3 was shut down for almost two months during the autumn. Despite the above, production from Swedish NPPs was much the same as during 2002. Total electricity production amounted to 65 TWh (65.2 TWh in 2002). On the average the energy availability of the eleven reactors was 79%. The PWRs at Ringhals had an average energy availability of 89%, while the BWRs reached 76%

  4. Using management of aging in German nuclear power plants - aspects of KTA 1403 pertaining to residual power operation, post-shutdown operation and residual operation

    International Nuclear Information System (INIS)

    Barreiro, Pablo; Bever, Thomas; Brast, Gerhard; Elsche, Bjoern; Reese, Sven H.; Grossmann, Patrick; Widera, Martin; Huettner, Frank; Linnemann, Thomas; Smit, Swen-Olaf; Zander, Ralf-Michael

    2013-01-01

    Management of aging in nuclear power plants originated in the United States of America and became a topic of debate in Germany from the late 1990s onward. On the basis of the existing plant-specific measures practiced comprehensively, KTA 1403, ''Management of Aging in Nuclear Power Plants'', was drafted and finalized in 2010. This publication first presents the context of AM with regard to German nuclear power plants, including references to national and international historical developments. Against this backdrop, the difference between management of aging and lifetime management is discussed next. This is followed by a description of the status of the AM process in nuclear power plants currently in operation, especially organizational plant-specific implementation. As a consequence of the decision by the German federal government to discontinue the peaceful use of nuclear power in Germany and the associated 13th amendment to the Atomic Energy Act of July 31, 2011, a considerable part of the German nuclear power plant park already lost its right of power operation. In this situation, aspects of AM are discussed for plants in the no-power, post-operation and residual operation phases. Finally, experience accumulated in plant-specific execution of the AM process on the basis of KTA 1403 is considered and summarized.

  5. Modifications at operating nuclear power plants

    International Nuclear Information System (INIS)

    Duffy, T.J.; Gazda, P.A.

    1985-01-01

    Modifications at operating nuclear power plants offer the structural engineer many challenges in the areas of scheduling of work, field adjustments, and engineering staff planning. The scheduling of structural modification work for operating nuclear power plants is normally closely tied to planned or unplanned outages of the plant. Coordination between the structural engineering effort, the operating plant staff, and the contractor who will be performing the modifications is essential to ensure that all work can be completed within the allotted time. Due to the inaccessibility of some areas in operating nuclear power plants or the short time available to perform the structural engineering in the case of an unscheduled outrage, field verification of a design is not always possible prior to initiating the construction of the modification. This requires the structural engineer to work closely with the contractor to promptly resolve problems due to unanticipated interferences or material procurement problems that may arise during the course of construction. The engineering staff planning for structural modifications at an operating nuclear power plant must be flexible enough to permit rapid response to the common ''fire drills,'' but controlled enough to ensure technically correct designs and to minimize the expenditure of man-hours and the resulting engineering cost

  6. Independent System Operators and Biomass Power

    International Nuclear Information System (INIS)

    Porter, Kevin L.

    1999-01-01

    Since the Federal Energy Regulatory Commission issued its landmark open access transmission rule in 1996, the idea of creating and establishing independent system operators (ISOs) has gained momentum. ISOs may help combine individual utility transmission systems into more regional transmission networks, which ultimately will allow biomass companies to transmit power over longer distances while paying a single transmission rate. To the extent that ISOs are combined or operated with power exchanges, however, biomass companies will likely face even more competitive market pressures. Few operators have experience with ISOs and power exchanges, but preliminary results show that short-term electricity market prices are probably too low for most biomass companies to compete against. Without policy measures, biomass companies may have to pursue strategic opportunities with short-term, spot-market sales; direct bilateral sales to customers; alternative power exchanges; and perhaps a ''green'' power market and sales to ancillary service markets. In addition, prices will likely be more volatile in a restructured market so biomass generators should be selling during those times

  7. Safer nuclear power. Strengthening training for operational safety at Paks nuclear power plant - Hungary

    International Nuclear Information System (INIS)

    2003-01-01

    For a nuclear power plant, safety must always be paramount. There can be no compromise on safety to meet production targets or to reduce costs. For any reactor, and in particular where older type reactors are in place, their operational safety can be enhanced by upgrading the training of personnel responsible for operating and maintaining the plant. The Department of Technical Co-operation is sponsoring a programme with technical support from the Nuclear Energy and Nuclear Safety Departments to help improve facilities at the PAKS plant in Hungary and establish self sufficiency in training to the highest international standards for all levels of nuclear power plant manpower. The Model Project described will have a direct impact on the improvement of operational safety and performance at PAKS NPP. It will lead to a more efficient use of resources which in turn will result in lower electricity generation costs. The impact of the project is not expected to be limited to Hungary. WWER reactors are common in Eastern Europe and provide one third to one half of the electricity supply to the region. The training programmes and facilities at PAKS offer a possibility in the future to provide training to experts from other countries operating WWER units and serve as a model to be emulated. Slovakia and the Czech Republic have already expressed interest in using the PAKS experience

  8. Three essential management processes of nuclear power plant operators

    International Nuclear Information System (INIS)

    Qi Tunfeng

    2010-01-01

    The paper takes the operation and management of Qinshan NPP Phase II as an example, focusing on the implementation of the essential process from the following three aspects the NPP production organization, training, examination and authorization for safety-related personnel, and financing budge management. A better understanding and implementation of the essential process will enable nuclear power plants to effectively control the nuclear safety from the most fundamental managerial level. (author)

  9. Operator training simulator for nuclear power plant

    International Nuclear Information System (INIS)

    Shiozuka, Hiromi

    1977-01-01

    In nuclear power plants, training of the operators is important. In Japan, presently there are two training centers, one is BWR operation training center at Okuma-cho, Fukushima Prefecture, and another the nuclear power generation training center in Tsuruga City, Fukui Prefecture, where the operators of PWR nuclear power plants are trained. This report describes the BWR operation training center briefly. Operation of a nuclear power plant is divided into three stages of start-up, steady state operation, and shut down. Start-up is divided into the cold-state start-up after the shut down for prolonged period due to periodical inspection or others and the hot-state start-up from stand-by condition after the shut down for a short time. In the cold-state start-up, the correction of reactivity change and the heating-up control to avoid excessive thermal stress to the primary system components are important. The BWR operation training center offers the next three courses, namely beginner's course, retraining course and specific training course. The training period is 12 weeks and the number of trainees is eight/course in the beginner's course. The simulator was manufactured by modeling No. 3 plant of Fukushima First Nuclear Power Station, Tokyo Electric Power Co. The simulator is composed of the mimic central control panel and the digital computer. The software system comprises the monitor to supervise the whole program execution, the logic model simulating the plant interlock system and the dynamic model simulating the plant physical phenomena. (Wakatsuki, Y.)

  10. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  11. An application and verification of ensemble forecasting on wind power to assess operational risk indicators in power grids

    Energy Technology Data Exchange (ETDEWEB)

    Alessandrini, S.; Ciapessoni, E.; Cirio, D.; Pitto, A.; Sperati, S. [Ricerca sul Sistema Energetico RSE S.p.A., Milan (Italy). Power System Development Dept. and Environment and Sustainable Development Dept.; Pinson, P. [Technical University of Denmark, Lyngby (Denmark). DTU Informatics

    2012-07-01

    Wind energy is part of the so-called not schedulable renewable sources, i.e. it must be exploited when it is available, otherwise it is lost. In European regulation it has priority of dispatch over conventional generation, to maximize green energy production. However, being variable and uncertain, wind (and solar) generation raises several issues for the security of the power grids operation. In particular, Transmission System Operators (TSOs) need as accurate as possible forecasts. Nowadays a deterministic approach in wind power forecasting (WPF) could easily be considered insufficient to face the uncertainty associated to wind energy. In order to obtain information about the accuracy of a forecast and a reliable estimation of its uncertainty, probabilistic forecasting is becoming increasingly widespread. In this paper we investigate the performances of the COnsortium for Small-scale MOdelling Limited area Ensemble Prediction System (COSMO-LEPS). First the ensemble application is followed by assessment of its properties (i.e. consistency, reliability) using different verification indices and diagrams calculated on wind power. Then we provide examples of how EPS based wind power forecast can be used in power system security analyses. Quantifying the forecast uncertainty allows to determine more accurately the regulation reserve requirements, hence improving security of operation and reducing system costs. In particular, the paper also presents a probabilistic power flow (PPF) technique developed at RSE and aimed to evaluate the impact of wind power forecast accuracy on the probability of security violations in power systems. (orig.)

  12. Safeguard assessment for life extension in nuclear power plants (NPPs) using a production function

    International Nuclear Information System (INIS)

    Woo, Tae-Ho; Lee, Un-Chul

    2011-01-01

    Research highlights: → The numerical value is constructed for the secure operation. → As the power increases, the NSEF increases. → Specific month could be indicated by the relative value of NSEF. → It is suggested for the better power in NPPs. → There is another possibility for the secure operation factors. - Abstract: Life extension is investigated as a safeguard assessment for the stability on the operation of the nuclear power plants (NPPs). The Cobb-Douglas function, one of the production functions, is modified for the nuclear safeguard in NPPs, which was developed for the life quality of the social and natural objects. Nuclear Safeguard Estimator Function (NSEF) is developed for the application in NPPs. The cases of NPPs are compared with each other in the aspect of the secure performance. The results are obtained by the standard productivity comparisons with the designed power operations. The range of secure life extension is between 1.008 and 5.353 in 2000 MW e and the range is between 0.302 and 0.994 in 600 MW e . So, the successfulness of the power operation increases about 5 times higher than that of the interested power in this study, which means that the safeguard assessment has been performed in the life extension of the NPPs. The technology assessment (TA) is suggested for the safe operation which is an advanced method comparing conventional probabilistic safety assessment (PSA).

  13. The UK approach to desalination and nuclear power dual purpose operation

    International Nuclear Information System (INIS)

    Pugh, O.

    1974-01-01

    Nuclear desalination is a particular example of dual purpose operation and the majority of desalting units installed around the world are operated in this way. A nuclear dual purpose concept has to be very large if present economic reactor designs are utilised. It is the size which has defeated the concept to date. Present fossil fired dual purpose installations are either in an economic situation (generally low fuel cost) where the inefficiencies introduced by operating away from the optimum water/power ratio are acceptable or, if optimised, the water and power blocks are small enough to allow introduction into the existing utility networks. As part of the United Kingdom, Water Resources Board (WRB) report 'Desalination 1972' the Central Electricity Generating Board (CEGB) and WRB identified nine coastal sites in the United Kingdom where nuclear power stations might be built during the next 15 years. The difficulties of dual purpose operation were recognised in the report, including additional water storage to cover the summer shutdown (turbine overhaul) period, modification of station design to facilitate the extraction of steam, etc. More seriously, as a given power station had higher fuelling costs relative to the newer station, the electrical utility might require compensation for continuing to operate it because of the associated desalting plant. Taking account of these factors and the replacement of the lost electricity production from other, maybe less efficient stations on the system

  14. Method of operating BWR type power plants

    International Nuclear Information System (INIS)

    Koyama, Kazuaki.

    1981-01-01

    Purpose: To improve the operation efficiency of BWR type reactors by reducing the time from the start-up of the reactor to the start-up of the turbine and electrical generator, as well as decrease the pressure difference in each of the sections of the pressure vessel to thereby extend its life span. Method: The operation comprises switching the nuclear reactor from the shutdown mode to the start-up mode, increasing the reactor power to a predetermined level lower than a rated power while maintaining the reactor pressure to a predetermined level lower than a rated pressure, starting up a turbine and an electrical generator in the state of the predetermined reactor pressure and the reactor power to connect the electrical generator to the power transmission system and, thereafter, increasing the reactor pressure and the reactor power to the predetermined rated pressure and rated power respectively. This can shorten the time from the start-up of the reactor to the start of the power transmission system, whereby the operation efficiency of the power plant can be improved. (Moriyama, K.)

  15. The armenian power system operation stability investigation accounting putting new power systems into operation

    International Nuclear Information System (INIS)

    Yeghiazaryan, L.V.; Hakobyan, S.G.; Gharibyan, G.V.; Harutyunyan, G.S.; Galstyan, G.H.

    2010-01-01

    The description of the power systems operation stability failure caused by the system significant emergency states occurred during the last working period in Armenian and USA power systems is performed. With the use of PSSTME-31 software portfolio of Siemens Firm a design model is developed and transient electromechanical process calculations for Armenian power system are performed. The accuracy of the model is checked by comparing real-time transient state parameters and their reproduction calculation results.The Armenia - Iran current power transmission lines permissible limit under the condition of the static and dynamic stability requirements and in case of the new thermal power units maintenance are defined

  16. Interactive videodisc training for power plant operations

    International Nuclear Information System (INIS)

    Nolan, R.; Nolan, J.; Campos, M.; Haukom, R.; Quentin, G.

    1990-01-01

    During the last several years, professionals in the personal computer and video fields have seen their two technologies coming together. This merging has created a new medium called multimedia. Multimedia provides the user with the interactivity of the personal computer and the realism of live-action television. It appears to be a perfect marriage for education, training and selling applications. As multimedia productions continue to be produced and tested with high marks, business and industry are becoming interested. The Interactive Videodisc Trainer (IVT) is a demonstration of how multimedia technology can be used by the electric power industry for operator training. Although the subject for this pilot program is the Claus sulfur recovery unit at the Cool Water Integrated Gasification Combined Cycle plant, similar courseware can be put to use for training at any type of power plant. The goal is to show many of the features and capabilities inherent in this powerful new training tool, so that utilities can begin to see how it could work for them

  17. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    International Nuclear Information System (INIS)

    Lythcke-Jørgensen, Christoffer; Haglind, Fredrik; Clausen, Lasse R.

    2014-01-01

    Highlights: • We model a system where lignocellulosic ethanol production is integrated with a combined heat and power (CHP) plant. • We conduct an exergy analysis for the ethanol production in six different system operation points. • Integrated operation, district heating (DH) production and low CHP loads all increase the exergy efficiency. • Separate operation has the largest negative impact on the exergy efficiency. • Operation is found to have a significant impact on the exergy efficiency of the ethanol production. - Abstract: Lignocellulosic ethanol production is often assumed integrated in polygeneration systems because of its energy intensive nature. The objective of this study is to investigate potential irreversibilities from such integration, and what impact it has on the efficiency of the integrated ethanol production. An exergy analysis is carried out for a modelled polygeneration system in which lignocellulosic ethanol production based on hydrothermal pretreatment is integrated in an existing combined heat and power (CHP) plant. The ethanol facility is driven by steam extracted from the CHP unit when feasible, and a gas boiler is used as back-up when integration is not possible. The system was evaluated according to six operation points that alternate on the following three different operation parameters: Load in the CHP unit, integrated versus separate operation, and inclusion of district heating production in the ethanol facility. The calculated standard exergy efficiency of the ethanol facility varied from 0.564 to 0.855, of which the highest was obtained for integrated operation at reduced CHP load and full district heating production in the ethanol facility, and the lowest for separate operation with zero district heating production in the ethanol facility. The results suggest that the efficiency of integrating lignocellulosic ethanol production in CHP plants is highly dependent on operation, and it is therefore suggested that the

  18. Monte Carlo simulation techniques for predicting annual power production

    International Nuclear Information System (INIS)

    Cross, J.P.; Bulandr, P.J.

    1991-01-01

    As the owner and operator of a number of small to mid-sized hydroelectric sites, STS HydroPower has been faced with the need to accurately predict anticipated hydroelectric revenues over a period of years. The typical approach to this problem has been to look at each site from a mathematical deterministic perspective and evaluate the annual production from historic streamflows. Average annual production is simply taken to be the area under the flow duration curve defined by the operating and design characteristics of the selected turbines. Minimum annual production is taken to be a historic dry year scenario and maximum production is viewed as power generated under the most ideal of conditions. Such an approach creates two problems. First, in viewing the characteristics of a single site, it does not take into account the probability of such an event occurring. Second, in viewing all sites in a single organization's portfolio together, it does not reflect the varying flow conditions at the different sites. This paper attempts to address the first of these two concerns, that being the creation of a simulation model utilizing the Monte Carlo method at a single site. The result of the analysis is a picture of the production at the site that is both a better representation of anticipated conditions and defined probabilistically

  19. Institute of Nuclear Power Operations (INPO)

    International Nuclear Information System (INIS)

    Pack, R.W.

    1980-01-01

    The electric utility industry established the Institute of Nuclear Power Operations, or INPO, the purpose of which is to ensure the highest quality of operations in nuclear power plants. INPO will be an industry self-help instrument focusing on human factors. From top management to the operator trainee, it will measure utility performance against benchmarks of excellence and help utilities reach those benchmarks throughout training and operating programs. INPO will see that the utilities ferret out lessons for all from the abnormal operating experiences of any. It will do everything possible to assist utilities in meeting its certification requirements, but will have the clout to see that those requirements are met. INPO is also managing the nationwide system of utility emergency response capability

  20. Power System Operation with Large Scale Wind Power Integration

    DEFF Research Database (Denmark)

    Suwannarat, A.; Bak-Jensen, B.; Chen, Z.

    2007-01-01

    to the uncertain nature of wind power. In this paper, proposed models of generations and control system are presented which analyze the deviation of power exchange at the western Danish-German border, taking into account the fluctuating nature of wind power. The performance of the secondary control of the thermal......The Danish power system starts to face problems of integrating thousands megawatts of wind power, which produce in a stochastic behavior due to natural wind fluctuations. With wind power capacities increasing, the Danish Transmission System Operator (TSO) is faced with new challenges related...... power plants and the spinning reserves control from the Combined Heat and Power (CHP) units to achieve active power balance with the increased wind power penetration is presented....

  1. Innovative applications of technology for nuclear power plant productivity improvements

    International Nuclear Information System (INIS)

    Naser, J. A.

    2012-01-01

    The nuclear power industry in several countries is concerned about the ability to maintain high plant performance levels due to aging and obsolescence, knowledge drain, fewer plant staff, and new requirements and commitments. Current plant operations are labor-intensive due to the vast number of operational and support activities required by commonly used technology in most plants. These concerns increase as plants extend their operating life. In addition, there is the goal to further improve performance while reducing human errors and increasingly focus on reducing operations and maintenance costs. New plants are expected to perform more productively than current plants. In order to achieve and increase high productivity, it is necessary to look at innovative applications of modern technologies and new concepts of operation. The Electric Power Research Inst. is exploring and demonstrating modern technologies that enable cost-effectively maintaining current performance levels and shifts to even higher performance levels, as well as provide tools for high performance in new plants. Several modern technologies being explored can provide multiple benefits for a wide range of applications. Examples of these technologies include simulation, visualization, automation, human cognitive engineering, and information and communications technologies. Some applications using modern technologies are described. (authors)

  2. Water use in the development and operation of geothermal power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. E.; Harto, C. B.; Sullivan, J. L.; Wang, M. Q. (Energy Systems); ( EVS)

    2010-09-17

    Geothermal energy is increasingly recognized for its potential to reduce carbon emissions and U.S. dependence on foreign oil. Energy and environmental analyses are critical to developing a robust set of geothermal energy technologies. This report summarizes what is currently known about the life cycle water requirements of geothermal electric power-generating systems and the water quality of geothermal waters. It is part of a larger effort to compare the life cycle impacts of large-scale geothermal electricity generation with other power generation technologies. The results of the life cycle analysis are summarized in a companion report, Life Cycle Analysis Results of Geothermal Systems in Comparison to Other Power Systems. This report is divided into six chapters. Chapter 1 gives the background of the project and its purpose, which is to inform power plant design and operations. Chapter 2 summarizes the geothermal electricity generation technologies evaluated in this study, which include conventional hydrothermal flash and binary systems, as well as enhanced geothermal systems (EGS) that rely on engineering a productive reservoir where heat exists but water availability or permeability may be limited. Chapter 3 describes the methods and approach to this work and identifies the four power plant scenarios evaluated: a 20-MW EGS plant, a 50-MW EGS plant, a 10-MW binary plant, and a 50-MW flash plant. The two EGS scenarios include hydraulic stimulation activities within the construction stage of the life cycle and assume binary power generation during operations. The EGS and binary scenarios are assumed to be air-cooled power plants, whereas the flash plant is assumed to rely on evaporative cooling. The well field and power plant design for the scenario were based on simulations using DOE's Geothermal Economic Technology Evaluation Model (GETEM). Chapter 4 presents the water requirements for the power plant life cycle for the scenarios evaluated. Geology

  3. Failures of knowledge production in nuclear power risk management

    International Nuclear Information System (INIS)

    Sanne, Johan M.

    2008-09-01

    Risks are ascribed in processes of knowledge production, where risk objects are defined and measures taken. This knowledge is also the basis for regulatory action. Thus, uncertainties in knowledge production, based upon choices of assumptions, methods, calculations and evidence criteria for reliable data create vulnerabilities for risk management and risk regulation. A recent incident in Swedish nuclear power plant provides an opportunity to develop theories of knowledge production in complex organizations. Knowledge modes within nuclear power can be characterized as either calculated logics where evidence claims need numbers, real time logics based upon subtle signals and tacit knowledge or as policy logics, navigating between internal and external demands for safety, trustworthiness and profit. The plant had neither foreseen the triggering event nor designed the plant to withstand it. I analyze how the plant and the regulator have interpreted the event, its significance and the measures taken to prevent similar events. I also discuss alternative interpretations, lack of knowledge and the generic deficiencies in knowledge production that the event indicates. First, the plant was not as robustly designed as expected. Deficiencies in diversification may have been caused by overconfidence in the reliability of its design. Second, inadequate design was ascribed to various deficient knowledge production processes: original design of the plant, reconstruction or caused by inadequate learning from previous events. The failures in knowledge production were probably caused by insufficient integration of different knowledge processes and limitations in engineering analysis. Knowledge about risks from nuclear power operations is mainly based upon calculations and simulations, not upon real events. But knowledge and design could be improved also without accidents. Control room operators and maintenance staff can provide invaluable knowledge and methods; to improve causal

  4. Failures of knowledge production in nuclear power risk management

    Energy Technology Data Exchange (ETDEWEB)

    Sanne, Johan M.

    2008-09-15

    Risks are ascribed in processes of knowledge production, where risk objects are defined and measures taken. This knowledge is also the basis for regulatory action. Thus, uncertainties in knowledge production, based upon choices of assumptions, methods, calculations and evidence criteria for reliable data create vulnerabilities for risk management and risk regulation. A recent incident in Swedish nuclear power plant provides an opportunity to develop theories of knowledge production in complex organizations. Knowledge modes within nuclear power can be characterized as either calculated logics where evidence claims need numbers, real time logics based upon subtle signals and tacit knowledge or as policy logics, navigating between internal and external demands for safety, trustworthiness and profit. The plant had neither foreseen the triggering event nor designed the plant to withstand it. I analyze how the plant and the regulator have interpreted the event, its significance and the measures taken to prevent similar events. I also discuss alternative interpretations, lack of knowledge and the generic deficiencies in knowledge production that the event indicates. First, the plant was not as robustly designed as expected. Deficiencies in diversification may have been caused by overconfidence in the reliability of its design. Second, inadequate design was ascribed to various deficient knowledge production processes: original design of the plant, reconstruction or caused by inadequate learning from previous events. The failures in knowledge production were probably caused by insufficient integration of different knowledge processes and limitations in engineering analysis. Knowledge about risks from nuclear power operations is mainly based upon calculations and simulations, not upon real events. But knowledge and design could be improved also without accidents. Control room operators and maintenance staff can provide invaluable knowledge and methods; to improve causal

  5. Consequences of reduced production of electricity in nuclear power plants

    International Nuclear Information System (INIS)

    The Swedish Power Administration has assessed the possibilities of expanding electric power sources other than nuclear power plants for the years 1980 and 1985. Reports on costs in the form of loss of capital and increased operating costs involved in the dismantling of nuclear power plants are made in Supplement 1. The economics division of the Finance Department, starting with a long-range study model of the Swedish economy, has calculated the consequences of a cutback in electric power up to 1980 for Sweden's economy and employment in that year. The consequences of reduction of electricity supplies up to 1985 are summarized in Supplement 2 in this report. It is concluded that in order to be able to manage the problem of supplying electricity by 1985, it will be necessary to increase oil power above what was assumed in the energy policy program. There will have to be new oil-based power as well. According to the Power Administration, oil-power facilities can be expanded to varying degrees, depending upon when the decision is made. The Power Administration's calculations show that 125 TWh is possible in 1985 without nuclear power only if a decision for discontinuation is made in the fall of 1976. This is based on very optimistic assumptions about the time of execution of a program for oil-steam operation, and also on the assumption that extreme measures will be initiated to force expansion of both district-heating distribution and power + heat facilities. Oil consumption for production of electricity in such an electric power system would be about 9 million m 3 , which is about 5 times more than at present and about one-third of the present total consumption of petroleum products in Sweden

  6. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  7. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-12-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which STUK - Radiation and Nuclear Safety Authority considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the second quarter of 1997, except for the annual maintenance outages of Olkiluoto plant units and the Midsummer outage at Olkiluoto 2 due to reduced demand for electricity. There were also brief interruptions in power operation at the Olkiluoto plant units due to three reactor scrams. All plant units are undergoing long-term test operation at upgraded reactor power level which has been approved by STUK The load factor average of all plant units was 88.7 %. One event in the second quarter of 1997 was classified level 1 on the INES. The event in question was a scram at Olkiluoto 1 which was caused by erroneous opening of switches. Other events in this quarter were level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  8. A game-theoretical model of private power production

    International Nuclear Information System (INIS)

    Xing, W.; Wu, F.F.

    2001-01-01

    Private power production has sprung up all over the world. The build-operate-transfer (BOT) arrangement has emerged as one of the most important options for private power production, especially in developing countries with rapidly growing demand and financial shortages. Based on oligopoly theory, the paper proposes a Stackelberg game model between a BOT investor and an electric utility whereby they can negotiate a long-term energy contract. Asymmetric pricing schemes are taken into account such that a host utility purchases electricity from a BOT company at its ''avoided cost'', and sells its electricity to end users at its ''average cost''. Our Stackelberg game model is transferred into a two-level optimization problem, and then solved by an iterative algorithm. The game model is demonstrated by an illustrative example. (author)

  9. Operating modes and practical power flow analysis of bidirectional isolated power interface for distributed power systems

    International Nuclear Information System (INIS)

    Wen, Huiqing; Su, Bin

    2016-01-01

    Highlights: • Four operating modes of Dual-Phase-Shift control for Dual Active Bridge converter are presented. • Effects of “minor parameters” such as the deadtime and power device voltage drops are analyzed. • Accurate power flow models with Dual-Phase-Shift control are developed and verified with experimental results. • Optimal operating mode is determined with respect to the efficiency improvement. • Measured efficiency of the Dual Active Bridge converter is improved up to 14%. - Abstract: Due to the intermittent nature of the renewable energy sources including photovoltaic and wind energy, the energy storage systems are essential to stabilize dc bus voltage. Considering the discharge depth of super-capacitors and energy-storage batteries, the bidirectional isolated power interface will operate for a wide range of voltage and power. This study focuses on in-depth analysis of the dual-active-bridge dc–dc converter that is controlled by the dual-phase-shift scheme to improve the conversion efficiency in distributed power system. The power flow of each operating mode with dual-phase-shift control is characterized based on a detailed analysis of the effects of “minor parameters”, including the deadtime and power device voltage drops. The complete output power plane of the dual-active-bridge converter with dual-phase-shift control is obtained and compared with experimental results. The optimal operating mode is determined according to the practical output power range and the power flow characteristics. Experimental evaluation shows the effectiveness of the proposed power flow model with dual-phase-shift control and significant efficiency improvement using the optimal mode of dual-phase-shift compared with the conventional phase shift control.

  10. Training of nuclear power plant operating personnel

    International Nuclear Information System (INIS)

    Anon.

    1980-04-01

    A collection is presented containing 11 papers submitted at a conference on the selection and education of specialists for operation and maintenance of nuclear power plants. The conference was attended by specialists from universities and colleges, research institutes and production plants. It debated the methods and aims of both general and specialized theoretical and practical personnel education, the proposals for teaching centre equipment, the use of simulators, computers and other aids in the teaching process; training on school reactors was included. A proposal was put forward of the system of education, the teaching process itself, the content of the basic theoretical subjects, and the method of testing pupils' knowledge. The importance was stressed of establishing a national coordination centre to safeguard the syllabus, methodology, teaching aids, and also the training proper. The system of personnel education in the Paks nuclear power plant, Hungary, is presented as an example. (M.S.)

  11. Power ramping/cycling experience and operational recommendations in KWU power plants

    International Nuclear Information System (INIS)

    Jan, R. von; Wunderlich, F.; Holzer, R.

    1980-01-01

    The power cycling and ramping experience of KWU is based on experiments in test and commercial reactors, and on evaluation of plant operation (PHWR, PWR and BWR). Power cycling of fuel rods have never lead to PCI failures. In ramping experiments, for fast ramps PCI failure thresholds of 480/420 W/cm are obtained at 12/23 GWd/t(U) burn-up for pressurized PWR fuel. No failures occurred during limited exceedance of the threshold with reduced ramp rate. Operational recommendations used by KWU are derived from experiments and plant experience. The effects of ramping considerations on plant operation is discussed. No rate restrictions are required for start-ups during an operating cycle or load follow operation within set limits for the distortion of the local power distribution. In a few situations, e.g. start-up after refueling, ramp rates of 1 to 5 %/h are recommended depending on plant and fuel design

  12. China’s Nuclear Power Plants in Operation

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated and managed by China.The plant came into commercial operation in April 1994.

  13. Use of wind power forecasting in operational decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Botterud, A.; Zhi, Z.; Wang, J.; Bessa, R.J.; Keko, H.; Mendes, J.; Sumaili, J.; Miranda, V. (Decision and Information Sciences); (INESC Porto)

    2011-11-29

    The rapid expansion of wind power gives rise to a number of challenges for power system operators and electricity market participants. The key operational challenge is to efficiently handle the uncertainty and variability of wind power when balancing supply and demand in ths system. In this report, we analyze how wind power forecasting can serve as an efficient tool toward this end. We discuss the current status of wind power forecasting in U.S. electricity markets and develop several methodologies and modeling tools for the use of wind power forecasting in operational decisions, from the perspectives of the system operator as well as the wind power producer. In particular, we focus on the use of probabilistic forecasts in operational decisions. Driven by increasing prices for fossil fuels and concerns about greenhouse gas (GHG) emissions, wind power, as a renewable and clean source of energy, is rapidly being introduced into the existing electricity supply portfolio in many parts of the world. The U.S. Department of Energy (DOE) has analyzed a scenario in which wind power meets 20% of the U.S. electricity demand by 2030, which means that the U.S. wind power capacity would have to reach more than 300 gigawatts (GW). The European Union is pursuing a target of 20/20/20, which aims to reduce greenhouse gas (GHG) emissions by 20%, increase the amount of renewable energy to 20% of the energy supply, and improve energy efficiency by 20% by 2020 as compared to 1990. Meanwhile, China is the leading country in terms of installed wind capacity, and had 45 GW of installed wind power capacity out of about 200 GW on a global level at the end of 2010. The rapid increase in the penetration of wind power into power systems introduces more variability and uncertainty in the electricity generation portfolio, and these factors are the key challenges when it comes to integrating wind power into the electric power grid. Wind power forecasting (WPF) is an important tool to help

  14. Evaluating and improving nuclear power plant operating performance

    International Nuclear Information System (INIS)

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world's most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America

  15. Wind farm electrical power production model for load flow analysis

    International Nuclear Information System (INIS)

    Segura-Heras, Isidoro; Escriva-Escriva, Guillermo; Alcazar-Ortega, Manuel

    2011-01-01

    The importance of renewable energy increases in activities relating to new forms of managing and operating electrical power: especially wind power. Wind generation is increasing its share in the electricity generation portfolios of many countries. Wind power production in Spain has doubled over the past four years and has reached 20 GW. One of the greatest problems facing wind farms is that the electrical power generated depends on the variable characteristics of the wind. To become competitive in a liberalized market, the reliability of wind energy must be guaranteed. Good local wind forecasts are therefore essential for the accurate prediction of generation levels for each moment of the day. This paper proposes an electrical power production model for wind farms based on a new method that produces correlated wind speeds for various wind farms. This method enables a reliable evaluation of the impact of new wind farms on the high-voltage distribution grid. (author)

  16. Hydrogen co-production from subcritical water-cooled nuclear power plants in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Gnanapragasam, N.; Ryland, D.; Suppiah, S., E-mail: gnanapragasamn@aecl.ca [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2013-06-15

    Subcritical water-cooled nuclear reactors (Sub-WCR) operate in several countries including Canada providing electricity to the civilian population. The high-temperature-steam-electrolysis process (HTSEP) is a feasible and laboratory-demonstrated large-scale hydrogen-production process. The thermal and electrical integration of the HTSEP with Sub-WCR-based nuclear-power plants (NPPs) is compared for best integration point, HTSEP operating condition and hydrogen production rate based on thermal energy efficiency. Analysis on integrated thermal efficiency suggests that the Sub-WCR NPP is ideal for hydrogen co-production with a combined efficiency of 36%. HTSEP operation analysis suggests that higher product hydrogen pressure reduces hydrogen and integrated efficiencies. The best integration point for the HTSEP with Sub-WCR NPP is upstream of the high-pressure turbine. (author)

  17. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  18. Generic study on the design and operation of high power targets

    Directory of Open Access Journals (Sweden)

    A. Ahmad

    2014-02-01

    Full Text Available With the move towards beam power in the range of 1–10 MW, a thorough understanding of the response of target materials and auxiliary systems to high power densities and intense radiation fields is required. This paper provides insight into three major aspects related to the design and operation of high power solid targets: thermal stresses, coolant performance, and radiation damage. Where appropriate, a figure-of-merit approach is followed to facilitate the comparison between different target or coolant candidates. The section on radiation damage reports total and spatial variations of displacement-per-atom and helium production levels in different target materials.

  19. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  20. Syntrophic interactions improve power production in formic acid fed MFCs operated with set anode potentials or fixed resistances

    KAUST Repository

    Sun, Dan

    2011-10-24

    Formic acid is a highly energetic electron donor but it has previously resulted in low power densities in microbial fuel cells (MFCs). Three different set anode potentials (-0.30, -0.15, and +0.15V; vs. a standard hydrogen electrode, SHE) were used to evaluate syntrophic interactions in bacterial communities for formic acid degradation relative to a non-controlled, high resistance system (1,000Ω external resistance). No current was generated at -0.30V, suggesting a lack of direct formic acid oxidation (standard reduction potential: -0.40V). More positive potentials that allowed for acetic acid utilization all produced current, with the best performance at -0.15V. The anode community in the -0.15V reactor, based on 16S rDNA clone libraries, was 58% Geobacter sulfurreducens and 17% Acetobacterium, with lower proportions of these genera found in the other two MFCs. Acetic acid was detected in all MFCs suggesting that current generation by G. sulfurreducens was dependent on acetic acid production by Acetobacterium. When all MFCs were subsequently operated at an external resistance for maximum power production (100Ω for MFCs originally set at -0.15 and +0.15V; 150Ω for the control), they produced similar power densities and exhibited the same midpoint potential of -0.15V in first derivative cyclic voltammetry scans. All of the mixed communities converged to similar proportions of the two predominant genera (ca. 52% G. sulfurreducens and 22% Acetobacterium). These results show that syntrophic interactions can be enhanced through setting certain anode potentials, and that long-term performance produces stable and convergent communities. © 2011 Wiley Periodicals, Inc.

  1. Syntrophic interactions improve power production in formic acid fed MFCs operated with set anode potentials or fixed resistances

    KAUST Repository

    Sun, Dan; Call, Douglas F.; Kiely, Patrick D.; Wang, Aijie; Logan, Bruce E.

    2011-01-01

    Formic acid is a highly energetic electron donor but it has previously resulted in low power densities in microbial fuel cells (MFCs). Three different set anode potentials (-0.30, -0.15, and +0.15V; vs. a standard hydrogen electrode, SHE) were used to evaluate syntrophic interactions in bacterial communities for formic acid degradation relative to a non-controlled, high resistance system (1,000Ω external resistance). No current was generated at -0.30V, suggesting a lack of direct formic acid oxidation (standard reduction potential: -0.40V). More positive potentials that allowed for acetic acid utilization all produced current, with the best performance at -0.15V. The anode community in the -0.15V reactor, based on 16S rDNA clone libraries, was 58% Geobacter sulfurreducens and 17% Acetobacterium, with lower proportions of these genera found in the other two MFCs. Acetic acid was detected in all MFCs suggesting that current generation by G. sulfurreducens was dependent on acetic acid production by Acetobacterium. When all MFCs were subsequently operated at an external resistance for maximum power production (100Ω for MFCs originally set at -0.15 and +0.15V; 150Ω for the control), they produced similar power densities and exhibited the same midpoint potential of -0.15V in first derivative cyclic voltammetry scans. All of the mixed communities converged to similar proportions of the two predominant genera (ca. 52% G. sulfurreducens and 22% Acetobacterium). These results show that syntrophic interactions can be enhanced through setting certain anode potentials, and that long-term performance produces stable and convergent communities. © 2011 Wiley Periodicals, Inc.

  2. Operating Experience with Nuclear Power Stations in Member States in 2014. 2015 Edition (CD-ROM)

    International Nuclear Information System (INIS)

    2015-01-01

    This CD-ROM contains the 46th edition of the IAEA’s series of annual reports on operating experience with nuclear power plants in Member States. It is a direct output from the IAEA’s Power Reactor Information System (PRIS) and contains information on electricity production and overall performance of individual plants during 2014. In addition to annual information, the report contains a historical summary of performance during the lifetime of individual plants and figures illustrating worldwide performance of the nuclear industry. The CD-ROM contains also an overview of design characteristics and dashboards of all operating nuclear power plants worldwide

  3. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-11-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the second quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of TVO plant units and the Midsummer shutdown at TVO II which was due to low electricity demand, a turbine generator inspection and repairs. The load factor average of all plant units was 88.9 %. Events in the second quarter of 1996 were classified level 0 on the International Nuclear Event Scale (INES)

  4. Operator training simulator for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Watanabe, Tadasu

    1988-01-01

    For the operation management of nuclear power stations with high reliability and safety, the role played by operators is very important. The effort of improving the man-machine interface in the central control rooms of nuclear power stations is energetically advanced, but the importance of the role of operators does not change. For the training of the operators of nuclear power stations, simulators have been used from the early stage. As the simulator facilities for operator training, there are the full scope simulator simulating faithfully the central control room of an actual plant and the small simulator mainly aiming at learning the plant functions. For BWR nuclear power stations, two full scope simulators are installed in the BWR Operator Training Center, and the training has been carried out since 1974. The plant function learning simulators have been installed in respective electric power companies as the education and training facilities in the companies. The role of simulators in operator training, the BTC No.1 simulator of a BWR-4 of 780 MWe and the BTC No.2 simulator of a BWR-5 of 1,100 MWe, plant function learning simulators, and the design of the BTC No.2 simulator and plant function learning simulators are reported. (K.I.)

  5. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  6. A game-theoretical model of private power production

    Energy Technology Data Exchange (ETDEWEB)

    Xing, W.; Wu, F.F. [University of Hong Kong (China). Dept. of Electrical and Electronic Engineering

    2001-03-01

    Private power production has sprung up all over the world. The build-operate-transfer (BOT) arrangement has emerged as one of the most important options for private power production, especially in developing countries with rapidly growing demand and financial shortages. Based on oligopoly theory, the paper proposes a Stackelberg game model between a BOT investor and an electric utility whereby they can negotiate a long-term energy contract. Asymmetric pricing schemes are taken into account such that a host utility purchases electricity from a BOT company at its ''avoided cost'', and sells its electricity to end users at its ''average cost''. Our Stackelberg game model is transferred into a two-level optimization problem, and then solved by an iterative algorithm. The game model is demonstrated by an illustrative example. (author)

  7. An analyser for power plant operations

    International Nuclear Information System (INIS)

    Rogers, A.E.; Wulff, W.

    1990-01-01

    Safe and reliable operation of power plants is essential. Power plant operators need a forecast of what the plant will do when its current state is disturbed. The in-line plant analyser provides precisely this information at relatively low cost. The plant analyser scheme uses a mathematical model of the dynamic behaviour of the plant to establish a numerical simulation. Over a period of time, the simulation is calibrated with measurements from the particular plant in which it is used. The analyser then provides a reference against which to evaluate the plant's current behaviour. It can be used to alert the operator to any atypical excursions or combinations of readings that indicate malfunction or off-normal conditions that, as the Three Mile Island event suggests, are not easily recognised by operators. In a look-ahead mode, it can forecast the behaviour resulting from an intended change in settings or operating conditions. Then, when such changes are made, the plant's behaviour can be tracked against the forecast in order to assure that the plant is behaving as expected. It can be used to investigate malfunctions that have occurred and test possible adjustments in operating procedures. Finally, it can be used to consider how far from the limits of performance the elements of the plant are operating. Then by adjusting settings, the required power can be generated with as little stress as possible on the equipment. (6 figures) (Author)

  8. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1997-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  9. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1998-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  10. Technical and economic aspects of operation of thermal and hydro power systems

    International Nuclear Information System (INIS)

    Bakken, Bjoern Harald.

    1997-01-01

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs

  11. Off-resonance frequency operation for power transfer in a loosely coupled air core transformer

    Science.gov (United States)

    Scudiere, Matthew B

    2012-11-13

    A power transmission system includes a loosely coupled air core transformer having a resonance frequency determined by a product of inductance and capacitance of a primary circuit including a primary coil. A secondary circuit is configured to have a substantially same product of inductance and capacitance. A back EMF generating device (e.g., a battery), which generates a back EMF with power transfer, is attached to the secondary circuit. Once the load power of the back EMF generating device exceeds a certain threshold level, which depends on the system parameters, the power transfer can be achieved at higher transfer efficiency if performed at an operating frequency less than the resonance frequency, which can be from 50% to 95% of the resonance frequency.

  12. Tobacco Products Production and Operations Reports

    Data.gov (United States)

    Department of the Treasury — Monthly statistical reports on tobacco products production and operations. Data for Tobacco Statistical Release is derived directly from the Report – Manufacturer of...

  13. Life Cycle Assessment of Coal-fired Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Spath, P. L.; Mann, M. K.; Kerr, D. R.

    1999-09-01

    Coal has the largest share of utility power generation in the US, accounting for approximately 56% of all utility-produced electricity (US DOE, 1998). Therefore, understanding the environmental implications of producing electricity from coal is an important component of any plan to reduce total emissions and resource consumption. A life cycle assessment (LCA) on the production of electricity from coal was performed in order to examine the environmental aspects of current and future pulverized coal boiler systems. Three systems were examined: (1) a plant that represents the average emissions and efficiency of currently operating coal-fired power plants in the US (this tells us about the status quo), (2) a new coal-fired power plant that meets the New Source Performance Standards (NSPS), and (3) a highly advanced coal-fired power plant utilizing a low emission boiler system (LEBS).

  14. Automation system for operation of nuclear power plant

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Fukuzaki, Koji; Kato, Kanji

    1991-01-01

    The automation system comprises a general monitor control device incorporating a plurality of emergency operation plannings concerning an automatic processing, and judging whether the operation is to be conducted or not depending on the plannings based on the data planed by a plant, a control device for controlling the plant in accordance with the planning when monitor control device judges that the operation should be done due to the emergency operation plannings and an operation planning device aiding the formation of the operation plannings. When the state of the power plant exceeds a normal control region, the reactor power is lowered automatically by so much as a predetermined value or to a predetermined level, to automatically return the plant state to the normal control region. In this way, the plant operation efficiency can be improved. Further, after automatic operation, since operation plannings for recovering original operation plannings are prepared efficiently and recovered operation plannings are started in a short period of time, the operators' burden can be mitigated and power saving can be attained. (N.H.)

  15. Effect of increased renewables generation on operation of thermal power plants

    International Nuclear Information System (INIS)

    Eser, Patrick; Singh, Antriksh; Chokani, Ndaona; Abhari, Reza S.

    2016-01-01

    Highlights: • Impacts of increased renewables in central European transmission system are assessed. • Individual transmission lines and power plants of transmission system are modelled. • Starts and ramps of thermal power plants significantly increase with increased renewables. • Impact of renewables on thermal power plants is highly dependent on location. - Abstract: High spatial and temporal resolution optimal power flow simulations of the 2013 and 2020 interconnected grid in Central Western and Eastern Europe regions are undertaken to assess the impact of an increased penetration of renewables on thermal power plants. In contrast to prior studies, the present work models each individual transmission line and power plant within the two regions. Furthermore, for conventional plants, electricity costs are determined with respect to fuel type, nameplate capacity, operating condition and geographic location; cycling costs are modeled as function of the recent operational history. For renewable power plants, costs and available power are determined using mesoscale weather simulations and hydrology models. Countrywide validation of the simulations shows that all renewable and most conventional power production is predicted with less than 10% error. It is shown that the increased penetration of renewables in 2020 will induce a 4–23% increase in the number of starts of conventional plants. The number of load ramps significantly increases by 63–181%, which underlines the necessity for equipment manufacturers and utilities to adapt to scenarios of high penetration of renewables. The increased cycling operation of coal plants is shown to depend strongly on the power plant’s location and is mainly observed in Germany and the Czech Republic. Austrian coal plants are cycled less because they supply more base load power to southern Germany, where several nuclear power plants will be phased out by 2020. Thus there is a need for more transmission capacity along

  16. Operating experience from Swedish nuclear power plants, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    From a safety point of view, 2000 was - as were previous years - satisfactory. Total electricity production from the Swedish nuclear power stations amounted to 54.2 TWh, which was over 20% less than the 70.2 TWh produced in 1999. The two main reasons for the reduction were the closure of Barsebaeck 1 on 1st December 1999, and the cutback in output from all reactors due to the particularly good availability of hydro power in 2000. Some reactors were even shut down completely as a result of the low power demand, which has not happened previously. The quantity of unutilised production capacity as a result of these reductions amounted to 11.6 TWh. Costdown operation prior to the annual overhaul shutdowns, which makes better use of the fuel, represented a further 2.1 TWh of unutilised capacity. The average energy availability of the three PWRs at Ringhals was 82.0%, while that of the eight BWRs was 84.2%. Forsmark 3, Ringhals 3 and Oskarshamn 3 all had average availabilities of over 90%. Of five events with safety implications that occurred in the plants during the year, three are described under Special Reporting. One of them relates to the crack indications in welds that were found in an American PWR in the autumn, and which were subsequently also found in Ringhals 4.

  17. Operating experience from Swedish nuclear power plants, 2000

    International Nuclear Information System (INIS)

    2001-01-01

    From a safety point of view, 2000 was - as were previous years - satisfactory. Total electricity production from the Swedish nuclear power stations amounted to 54.2 TWh, which was over 20% less than the 70.2 TWh produced in 1999. The two main reasons for the reduction were the closure of Barsebaeck 1 on 1st December 1999, and the cutback in output from all reactors due to the particularly good availability of hydro power in 2000. Some reactors were even shut down completely as a result of the low power demand, which has not happened previously. The quantity of unutilised production capacity as a result of these reductions amounted to 11.6 TWh. Costdown operation prior to the annual overhaul shutdowns, which makes better use of the fuel, represented a further 2.1 TWh of unutilised capacity. The average energy availability of the three PWRs at Ringhals was 82.0%, while that of the eight BWRs was 84.2%. Forsmark 3, Ringhals 3 and Oskarshamn 3 all had average availabilities of over 90%. Of five events with safety implications that occurred in the plants during the year, three are described under Special Reporting. One of them relates to the crack indications in welds that were found in an American PWR in the autumn, and which were subsequently also found in Ringhals 4

  18. On optimization of power production

    Energy Technology Data Exchange (ETDEWEB)

    Feltenmark, S.

    1997-01-01

    Short-term optimization of power production is treated. It concerns the problem of determining a production schedule for a power system, which minimizes the total cost of production, while satisfying various constraints. The thesis consists of an introductory chapter, four chapters that each concerns a specific problem area (economic dispatch, unit commitment, hydro power planning and cogeneration optimization), plus a chapter with relevant theory. The emphasis of the thesis is on the mathematical structures that arise in problems in this field, and how to exploit them algorithmically. A recurring theme is convexification, either implicit, by dualization, or explicit, as in our approach to hydro power optimization. 134 refs

  19. An analysis of nuclear power plant operating costs

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a statistical analysis of nonfuel operating costs for nuclear power plants. Most studies of the economic costs of nuclear power have focused on the rapid escalation in the cost of constructing a nuclear power plant. The present analysis found that there has also been substantial escalation in real (inflation-adjusted) nonfuel operating costs. It is important to determine the factors contributing to the escalation in operating costs, not only to understand what has occurred but also to gain insights about future trends in operating costs. There are two types of nonfuel operating costs. The first is routine operating and maintenance expenditures (O and M costs), and the second is large postoperational capital expenditures, or what is typically called ''capital additions.'' O and M costs consist mainly of expenditures on labor, and according to one recently completed study, the majoriy of employees at a nuclear power plant perform maintenance activities. It is generally thought that capital additions costs consist of large maintenance expenditures needed to keep the plants operational, and to make plant modifications (backfits) required by the Nuclear Regulatory Commission (NRC). Many discussions of nuclear power plant operating costs have not considered these capital additions costs, and a major finding of the present study is that these costs are substantial. The objective of this study was to determine why nonfuel operating costs have increased over the past decade. The statistical analysis examined a number of factors that have influenced the escalation in real nonfuel operating costs and these are discussed in this report. 4 figs, 19 tabs

  20. Instrumentation and control activities at the Electric Power Research Institute to support operator support systems

    International Nuclear Information System (INIS)

    Naser, J.

    1995-01-01

    Most nuclear power plants in the United States continue to operate with analog instrumentation and control (I and C) technology designed 20 to 40 years ago. This equipment is approaching or exceeding its life expectancy, resulting in increasing maintenance efforts to sustain system performance. Decreasing availability of replacement parts and the accelerating deterioration of the infrastructure of manufacturers that support analog technology exacerbate obsolescence problems and resultant operation and maintenance (O and M) cost increases. Modern digital technology holds a significant potential to improve the safety, cost-effectiveness, productivity, and, therefore, competitiveness of nuclear power plants. Operator support systems provide the tools to help achieve this potential. Reliable, integrated information is a critical element for protecting the utility's capital investment and increasing availability, reliability, and productivity. Integrated operator support systems with integrated information can perform more effectively to increase productivity, to enhance safety, and to reduce O and M costs. The plant communications and computing architecture is the infrastructure needed to allow the implementation of I and C systems and associated operator support systems in an integrated manner. Current technology for distributed digital systems, plant process computers, and plant communications and computing networks support the integration of systems and information. (author). 16 refs

  1. Higher operational safety of nuclear power plants by evaluating the behaviour of operating personnel

    International Nuclear Information System (INIS)

    Mertins, M.; Glasner, P.

    1990-01-01

    In the GDR power reactors have been operated since 1966. Since that time operational experiences of 73 cumulative reactor years have been collected. The behaviour of operating personnel is an essential factor to guarantee the safety of operation of the nuclear power plant. Therefore a continuous analysis of the behaviour of operating personnel has been introduced at the GDR nuclear power plants. In the paper the overall system of the selection, preparation and control of the behaviour of nuclear power plant operating personnel is presented. The methods concerned are based on recording all errors of operating personnel and on analyzing them in order to find out the reasons. The aim of the analysis of reasons is to reduce the number of errors. By a feedback of experiences the nuclear safety of the nuclear power plant can be increased. All data necessary for the evaluation of errors are recorded and evaluated by a computer program. This method is explained thoroughly in the paper. Selected results of error analysis are presented. It is explained how the activities of the personnel are made safer by means of this analysis. Comparisons with other methods are made. (author). 3 refs, 4 figs

  2. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-12-01

    During the second quarter of 1990 the Finnish nuclear plant units Loviisa 1 and 2 and TVO and II were in commercial operation for most of the time. The feedwater pipe rupture at Loviisa 1 and the resulting inspections and repairs at both Loviisa plant units brought about an outage the overall duration of which was 32 days. The annual maintenance outages of the TVO plant units were arranged during the report period and their combined duration was 31.5 days. Nuclear electricity accounted for 35.3% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 83.0%. Three events occurred during the report period which are classified as Level 1 on the International Nuclear Event Scale: feedwater pipe rupture at Loviisa 1, control rod withdrawal at TVO I in a test during an outage when the hydraulic scram system was rendered inoperable and erroneous fuel bundle transfers during control rod drives maintenance at TVO II. Other events during this quarter are classified as Level Zero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. Only small amounts of nuclides originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  3. Contribution of quality assurance to effective nuclear power plant operation

    International Nuclear Information System (INIS)

    Raisic, N.

    1984-01-01

    The regulatory requirements related to quality assurance (QA) serve as an effective mechanism in establishing and implementing the QA programme during the design, construction and operation of nuclear power plants. However, these requirements only relate to the equipment and activities concerning the safety of nuclear power plants; the decision as to their implementation on other non-safety-related equipment is left to the plant management. As a result, operation statistics show that the safety-related systems are performing satisfactorily and that they are not of serious concern to plant unavailability. On the other hand, non-safety-related equipment which is still vital to plant performances is more frequently responsible for plant outages and losses in electricity production. QA programmes implemented on such equipment are in principle less strict, unsystematic and, in a number of cases, non-existent. An attempt has been made to analyse the existing operating experience data in order to identify the correlation of outage statistics with QA programmes required by existing standards and their implementation practices, both in respect of programme coverage and intensity. Unfortunately, existing operating experience data cannot directly correlate plant performance with the QA programmes implemented in order to demonstrate the effectiveness of QA techniques to plant safety, reliability of plant equipment and plant availability. For these reasons an analysis is made of outage statistics to identify the modes and causes of outages and to relate them to existing QA requirements and practices. Some conclusions are deduced that relate to a possible improvement of plant performance by consequent implementation of QA requirements to the equipment and activities responsible for both plant safety and efficient electricity production, and by adequate grading of QA activities to obtain a cost-effective QA programme in plant operation. (author)

  4. Operational and environmental performance in China's thermal power industry: Taking an effectiveness measure as complement to an efficiency measure.

    Science.gov (United States)

    Wang, Ke; Zhang, Jieming; Wei, Yi-Ming

    2017-05-01

    The trend toward a more fiercely competitive and strictly environmentally regulated electricity market in several countries, including China has led to efforts by both industry and government to develop advanced performance evaluation models that adapt to new evaluation requirements. Traditional operational and environmental efficiency measures do not fully consider the influence of market competition and environmental regulations and, thus, are not sufficient for the thermal power industry to evaluate its operational performance with respect to specific marketing goals (operational effectiveness) and its environmental performance with respect to specific emissions reduction targets (environmental effectiveness). As a complement to an operational efficiency measure, an operational effectiveness measure not only reflects the capacity of an electricity production system to increase its electricity generation through the improvement of operational efficiency, but it also reflects the system's capability to adjust its electricity generation activities to match electricity demand. In addition, as a complement to an environmental efficiency measure, an environmental effectiveness measure not only reflects the capacity of an electricity production system to decrease its pollutant emissions through the improvement of environmental efficiency, but it also reflects the system's capability to adjust its emissions abatement activities to fulfill environmental regulations. Furthermore, an environmental effectiveness measure helps the government regulator to verify the rationality of its emissions reduction targets assigned to the thermal power industry. Several newly developed effectiveness measurements based on data envelopment analysis (DEA) were utilized in this study to evaluate the operational and environmental performance of the thermal power industry in China during 2006-2013. Both efficiency and effectiveness were evaluated from the three perspectives of operational

  5. Operational reliability evaluation of restructured power systems with wind power penetration utilizing reliability network equivalent and time-sequential simulation approaches

    DEFF Research Database (Denmark)

    Ding, Yi; Cheng, Lin; Zhang, Yonghong

    2014-01-01

    In the last two decades, the wind power generation has been rapidly and widely developed in many regions and countries for tackling the problems of environmental pollution and sustainability of energy supply. However, the high share of intermittent and fluctuating wind power production has also...... and reserve provides, fast reserve providers and transmission network in restructured power systems. A contingency management schema for real time operation considering its coupling with the day-ahead market is proposed. The time-sequential Monte Carlo simulation is used to model the chronological...

  6. System Evaluation and Economic Analysis of a HTGR Powered High-Temperature Electrolysis Hydrogen Production Plant

    International Nuclear Information System (INIS)

    McKellar, Michael G.; Harvego, Edwin A.; Gandrik, Anastasia A.

    2010-01-01

    A design for a commercial-scale high-temperature electrolysis (HTE) plant for hydrogen production has been developed. The HTE plant is powered by a high-temperature gas-cooled reactor (HTGR) whose configuration and operating conditions are based on the latest design parameters planned for the Next Generation Nuclear Plant (NGNP). The current HTGR reference design specifies a reactor power of 600 MWt, with a primary system pressure of 7.0 MPa, and reactor inlet and outlet fluid temperatures of 322 C and 750 C, respectively. The power conversion unit will be a Rankine steam cycle with a power conversion efficiency of 40%. The reference hydrogen production plant operates at a system pressure of 5.0 MPa, and utilizes a steam-sweep system to remove the excess oxygen that is evolved on the anode (oxygen) side of the electrolyzer. The overall system thermal-to-hydrogen production efficiency (based on the higher heating value of the produced hydrogen) is 40.4% at a hydrogen production rate of 1.75 kg/s and an oxygen production rate of 13.8 kg/s. An economic analysis of this plant was performed with realistic financial and cost estimating assumptions. The results of the economic analysis demonstrated that the HTE hydrogen production plant driven by a high-temperature helium-cooled nuclear power plant can deliver hydrogen at a cost of $3.67/kg of hydrogen assuming an internal rate of return, IRR, of 12% and a debt to equity ratio of 80%/20%. A second analysis shows that if the power cycle efficiency increases to 44.4%, the hydrogen production efficiency increases to 42.8% and the hydrogen and oxygen production rates are 1.85 kg/s and 14.6 kg/s respectively. At the higher power cycle efficiency and an IRR of 12% the cost of hydrogen production is $3.50/kg.

  7. Evaluating and improving nuclear power plant operating performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world`s most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America Figs, tabs

  8. Facing the challenges of distribution systems operation with high wind power penetration

    DEFF Research Database (Denmark)

    Das, Kaushik; Altin, Müfit; Hansen, Anca Daniela

    2017-01-01

    power flow in 60kV distribution networks through controlling the ability of wind power plants (WPPs) to generate or absorb reactive power. This paper aims to understand the characteristics of a distribution network with high penetration of distributed generation. A detailed analysis of the active...... and reactive power flows in a real distribution network under different wind and load conditions based on actual measurements is performed in order to understand the correlation between the consumption, wind power production, and the network losses. Conclusive remarks are presented, briefly expressing......This paper addresses the challenges associated with the operation of a distribution system with high penetration of wind power. The paper presents some preliminary investigations of an ongoing Danish research work, which has as main objective to reduce the network losses by optimizing the reactive...

  9. Spanish Power Exchange Market Concepts and Operating Experience

    International Nuclear Information System (INIS)

    Gonzalez, J. J.; Gamito, C.

    2000-01-01

    On January, 1st, 1998, the Spanish Electricity Market started operations. All generators, distributors, commercialization companies, and final consumers negotiate al power exchanges either through the spot market or using bilateral contracts. The Spanish Power Exchange Market Operator (Compania Operadora del Mercado Espanol de electricidad, OMEL) is responsible for the management of the market and for the economic settlement and billing of a transactions on the Power Exchange market, and the technical operational process handled by the System Operator. This paper describes in detail the Spanish market principles and the experience gathered through the design, installation and first two years of market operation. The paper presents also the Spanish market results from January 1998 up to December 1999 indicating each specific market results and aggregate statistics. (Author)

  10. Research of the Power Plant Operational Modes

    Directory of Open Access Journals (Sweden)

    Koismynina Nina M.

    2017-01-01

    Full Text Available In this article the algorithm of the power plant operational modes research is offered. According to this algorithm the program for the modes analysis and connection power transformers choice is developed. The program can be used as educational means for studying of the power plant electric part, at the same time basic data are provided. Also the program can be used for the analysis of the working power plants modes. Checks of the entered data completeness and a choice correctness of the operational modes are provided in the program; in all cases of a deviation from the correct decisions to the user the relevant information is given.

  11. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2001-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  12. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  13. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  14. Improving operator quality at Genkai Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kuwano, Takeshi.

    1989-01-01

    Improvement in operator quality, or improvement in an operator's skill and professional knowledge, is of prime importance because of its great influence on safe and steady plant operation. This paper describes the education and training of reactor operators at the Genkai pressurized water reactor nuclear power plant with respect to the following topics: organization of Genkai power plant; education and training program management; training at the Nuclear Training Center; training and education on-site including emergency procedures training, normal operating procedures training, informational study of emergency conditions in existing plants, and all-around training of operators; qualifying tests for supervisors; and operator motivation

  15. Anomalous dimension of subleading-power N-jet operators

    Science.gov (United States)

    Beneke, Martin; Garny, Mathias; Szafron, Robert; Wang, Jian

    2018-03-01

    We begin a systematic investigation of the anomalous dimension of subleading power N-jet operators in view of resummation of logarithmically enhanced terms in partonic cross sections beyond leading power. We provide an explicit result at the one-loop order for fermion-number two N-jet operators at the second order in the power expansion parameter of soft-collinear effective theory.

  16. Operating Experience with Nuclear Power Stations in Member States in 2013. 2014 Edition (CD-ROM)

    International Nuclear Information System (INIS)

    2014-07-01

    This CD-ROM contains the 45th edition of the IAEA's series of annual reports on operating experience with nuclear power plants in Member States. It is a direct output from the IAEA's Power Reactor Information System (PRIS) and contains information on electricity production and overall performance of individual plants during 2013. In addition to annual information, the report contains a historical summary of performance during the lifetime of individual plants and figures illustrating worldwide performance of the nuclear industry. The CD-ROM contains also an overview of design characteristics and dashboards (not included into the web version) of all operating nuclear power plants worldwide

  17. Fatigue assessments in operating nuclear power plants

    International Nuclear Information System (INIS)

    Gosselin, S.R.; Deardorff, A.F.; Peltola, D.W.

    1994-01-01

    In November 1991, the ASME Section XI Task Group on Operating Plant Fatigue Assessment was formed to develop criteria and evaluation methodology for evaluating the effects of cyclic operation in operating nuclear power plants. The objective was to develop guidelines for inclusion in Section XI that could be used by plant operators in evaluating fatigue concerns and their impact on serviceability. This paper discusses the work performed by the Task Group. It explores the concept of ''Fatigue Design Basis'' versus ''Fatigue Operating Basis'' by examining the roles of ASME Section III and ASME Section XI in the design and operation of the nuclear power plants. Guidelines are summarized that may help plant operators perform effective design transient cycle evaluations and optimize cycle counting and fatigue usage tracking. The alternative fatigue evaluation approach using flaw tolerance is also introduced

  18. Ten-yearly report on operations at the Garigliano nuclear power station

    International Nuclear Information System (INIS)

    1977-01-01

    This document is the final report on operation of the Garigliano Nuclear Power Station as required under the participation contract between Enel and Euratom and refers to the first ten years of commercial operation (1 May 1964-31 December 1973) of the power station. In the decade in question the Garigliano Power Station has assumed an important position in the world spectrum of nuclear energy since it was the first thermal-power reactor in the world to have irradiated considerable quantities of plutonium as a fuel in its own core for the production of energy. An experimental programme on this was started in 1966 with theoretical study of plutonium recycling and was followed by the charging of the Garigliano reactor with some mixed oxide elements (PuO 2 -UO 2 ) in 1968 and 1970. The excellent performance of these prototype elements, which among other things were examined in detail at the end of each radiation cycle, prompted Enel to decide in favour of the use of entire batches of recycled fuel elements of the PuO 2 -UO 2 type in the reactor from 1975 onwards

  19. Operating room management and operating room productivity: the case of Germany.

    Science.gov (United States)

    Berry, Maresi; Berry-Stölzle, Thomas; Schleppers, Alexander

    2008-09-01

    We examine operating room productivity on the example of hospitals in Germany with independent anesthesiology departments. Linked to anesthesiology group literature, we use the ln(Total Surgical Time/Total Anesthesiologists Salary) as a proxy for operating room productivity. We test the association between operating room productivity and different structural, organizational and management characteristics based on survey data from 87 hospitals. Our empirical analysis links improved operating room productivity to greater operating room capacity, appropriate scheduling behavior and management methods to realign interests. From this analysis, the enforcing jurisdiction and avoiding advance over-scheduling appear to be the implementable tools for improving operating room productivity.

  20. Shutdown and low-power operation at commercial nuclear power plants in the United States

    International Nuclear Information System (INIS)

    1993-09-01

    The report contains the results of the NRC Staff's evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements

  1. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  2. Method to operate power reactors with light water cooling

    International Nuclear Information System (INIS)

    Aleite, W.; Bock, H.W.

    1976-01-01

    The invention provides a possibility to 'condition' the fuel of a power plant used in base load operation, i.e. to bring it to such a high power density level that the local excesses arising with the occasional total power changes, remain below the power densities reached in normal operation (conditioning level). (orig./RW) [de

  3. Load following operation of nuclear power plants for meeting power system requirements

    International Nuclear Information System (INIS)

    Isoda, Hachiro

    1987-01-01

    This paper describes a calculating program on the availability factors of nuclear, thermal and pumed storage hydro power stations and some calculated results for typical three load factors, 55 %, 60 % and 71 %, are provided when the share of the nuclea power station in the generation facilities is increased. The load following requirement of the nuclear power station is also provided. Load following requirement: If there is a 10 % pumped storage hydro power station, the nuclear power station enables to be operated with its rated output up to 30 % - 35 % of its share. Its daily load following operation for 40 % and 50 % nuclear power station needs every weekend and every day respectively. Availability factor: The availability factor of the nuclear power station manages to get 80 % (maximum availability factor of the nuclear power station in this study) up to 30 % share of it with 10 % pumpued storage hydro power station. When the nuclear power station shares 40 % and 50 %, its availability factor decreases down 1 % and 5 % respectively. (author)

  4. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  5. Operational safety of nuclear power plants

    International Nuclear Information System (INIS)

    Tanguy, P.

    1987-01-01

    The operational safety of nuclear power plants has become an important safety issue since the Chernobyl accident. A description is given of the various aspects of operational safety, including the importance of human factors, responsibility, the role and training of the operator, the operator-machine interface, commissioning and operating procedures, experience feedback, and maintenance. The lessons to be learnt from Chernobyl are considered with respect to operator errors and the management of severe accidents. Training of personnel, operating experience feedback, actions to be taken in case of severe accidents, and international cooperation in the field of operational safety, are also discussed. (U.K.)

  6. Recent Enhancements in NOAA's JPSS Land Product Suite and Key Operational Applications

    Science.gov (United States)

    Csiszar, I. A.; Yu, Y.; Zhan, X.; Vargas, M.; Ek, M. B.; Zheng, W.; Wu, Y.; Smirnova, T. G.; Benjamin, S.; Ahmadov, R.; James, E.; Grell, G. A.

    2017-12-01

    A suite of operational land products has been produced as part of NOAA's Joint Polar Satellite System (JPSS) program to support a wide range of operational applications in environmental monitoring, prediction, disaster management and mitigation, and decision support. The Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (NPP) and the operational JPSS satellite series forms the basis of six fundamental and multiple additional added-value environmental data records (EDRs). A major recent improvement in the land-based VIIRS EDRs has been the development of global gridded products, providing a format and science content suitable for ingest into NOAA's operational land surface and coupled numerical weather prediction models. VIIRS near-real-time Green Vegetation Fraction is now in the process of testing for full operational use, while land surface temperature and albedo are under testing and evaluation. The operational 750m VIIRS active fire product, including fire radiative power, is used to support emission modeling and air quality applications. Testing the evaluation for operational NOAA implementation of the improved 375m VIIRS active fire product is also underway. Added-value and emerging VIIRS land products include vegetation health, phenology, near-real-time surface type and surface condition change, and other biogeophysical variables. As part of the JPSS program, a global soil moisture data product has also been generated from the Advanced Microwave Scanning Radiometer 2 (AMSR2) sensor on the GCOM-W1 (Global Change Observation Mission - Water 1) satellite since July 2012. This product is included in the blended NESDIS Soil Moisture Operational Products System, providing soil moisture data as a critical input for land surface modeling.

  7. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  8. Summary of operating experience in Swiss nuclear power plants 1993

    International Nuclear Information System (INIS)

    1994-07-01

    In 1993 the Swiss nuclear power plants produced their third highest combined annual output. The contribution to the total electricity generation in the country was close to 37%. Replacement of the steam generators in Beznau Unit 1 resulted in a longer than usual annual outage. For the other four units the availability figures were close to, or exceeded, those of previous years. The energy utilization was, however, lowered due to load reduction in autumn resulting from unusually high production by the hydro-electric power plants. The steam generator replacement at Beznau enabled an increase in electrical power of about 2% without increase in reactor power. With the approval of the Swiss government in December 1992, the output of the Muehleberg power plant was increased in two stages by a total of 10%. The application for an unlimited operating license for Beznau Unit 2, and for a power uprate at the Leibstadt power plant, are still pending. The average number of scrams at the Swiss plants remained stable, at less than one scram per reactor year. As a result of experience in the Swedish nuclear power plant at Barsebaeck, the suction strainers of the emergency core cooling systems of the boiling water reactors at Muehleberg and Leibstadt were replaced by strainers with larger surface areas. The re-inspection of crack indications previously detected in the core shroud of the Muehleberg reactor and the penetration tubes in the reactor pressure vessel closure head of Beznau revealed no growth during the intervening operating periods. Following the completion of installation activities during the annual outages at Beznau Unit 1, Goesgen and Leibstadt, all Swiss nuclear power plants are now equipped with filtered containment venting systems. (author) figs., tabs

  9. High-power and highly reliable 638-nm band BA-LD for CW operation

    Science.gov (United States)

    Nishida, Takehiro; Kuramoto, Kyosuke; Abe, Shinji; Kusunoki, Masatsugu; Miyashita, Motoharu; Yagi, Tetsuya

    2018-02-01

    High-power laser diodes (LDs) are strongly demanded as light sources of display applications. In multiple spatial light modulator-type projectors or liquid crystal displays, the light source LDs are operated under CW condition. The high-power 638-nm band broad-area LD for CW operation was newly developed. The LD consisted of two stripes with each width of 75 μm to reduce both an optical power density at a front facet and a threshold current. The newly improved epitaxial technology was also applied to the LD to suppress an electron overflow from an active layer. The LD showed superior output characteristics, such as output of 1.77 W at case temperature of 55 °C with wall plug efficiency (WPE) of 23%, which was improved by 40% compared with the current product. The peak WPE at 25 °C reached 40.6% under the output power of 2.37 W, CW, world highest.

  10. Decontamination of operational nuclear power plants

    International Nuclear Information System (INIS)

    1981-06-01

    In order to reduce the radiation fields around nuclear power plants, and, consequently, to limit the radiation exposure of and dose commitments to the operating and maintenance personnel, the contamination build-up should be kept to a minimum. The most fruitful approach, from the point of view of economics and efficiency, is to tackle the problems of contamination and decontamination in the design and construction phases of the reactor. To do this, knowledge gained from the operation of existing power reactors should be used to make improvements in new designs. New structural materials with low corrosion rates or whose constituents are not activated by neutrons should also be used. For older reactors, in most cases it is already too late to incorporate design changes without extensive and expensive modifications. For these plants, decontamination remains the most efficient way to reduce radiation fields. The aim of this report is to deal with the different decontamination methods that may be applied to nuclear power plant circuits and equipment during operation. The factors that have to be considered in determining the type and the extent of the methods used are the engineering and the planning of the decontamination operation and the treatment of the resulting waste generated during the process are also discussed

  11. Training and qualification of nuclear power plant operators

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2008-01-01

    Based on training experiences of the nuclear power plant operators of pressurized water reactors (PWR) at the Nuclear Power Training Center Ltd. (NTC) in Japan, training programs were reviewed referring to US training programs. A systematic approach is deployed to them, which mainly consist of on-the-job training and the NTC training courses to meet the needs of all operators from beginners to experienced veterans according to their experiences and objectives. The NTC training is conducted using the simulators that simulate the nuclear power plant dynamics through the use of computers. The operators trained at the NTC work in the central control room of every PWR power plant. The NTC also carries out the qualification examinations for the shift managers. (T. Tanaka)

  12. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-12-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well TVO I and II were in operation for almost the whole second quarter of 1992. Longer breaks in production were caused by the annual maintenance of the TVO plant units. The load factor was 87.4 %. At TVO I it was detected during the annual maintenance outage when removing nuclear fuel assemblies from the reactor that one assembly had been loaded into the reactor in an incorrect manner during the previous year's annual maintenance: the assembly was slightly higher than the other assemblies. The water cooling the nuclear fuel partly by-passed the fuel assembly and the coolant flow proper passing through the assembly was below design. The fuel assembly's cooling had been sufficient during the whole operating cycle but could have essentially deteriorated during certain transients with the danger of consequent damage to some fuel rods. On the International Nuclear Event Scale the event is classified as level 1. Other events in this quarter which are classified on the International Nuclear Event Scale were level 0/below scale on the scale

  13. Quality assurance during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations for the establishment and implementation of quality assurance for activities important to safety during commissioning, operation and decommissioning of a nuclear power plant, hereinafter referred to in this Guide as the operation phase or operation. It applies to activities such as: operating, inspecting, testing, commissioning, refuelling, maintaining, repairing, modifying and eventual shut-down and decommissioning of nuclear power plants. It applies also to associated activities related to safety, such as environmental monitoring and responses to emergencies

  14. Economical analyses of build-operate-transfer model in establishing alternative power plants

    Energy Technology Data Exchange (ETDEWEB)

    Yumurtaci, Zehra [Yildiz Technical University, Department of Mechanical Engineering, Y.T.U. Mak. Fak. Mak. Muh. Bolumu, Besiktas, 34349 Istanbul (Turkey)]. E-mail: zyumur@yildiz.edu.tr; Erdem, Hasan Hueseyin [Yildiz Technical University, Department of Mechanical Engineering, Y.T.U. Mak. Fak. Mak. Muh. Bolumu, Besiktas, 34349 Istanbul (Turkey)

    2007-01-15

    The most widely employed method to meet the increasing electricity demand is building new power plants. The most important issue in building new power plants is to find financial funds. Various models are employed, especially in developing countries, in order to overcome this problem and to find a financial source. One of these models is the build-operate-transfer (BOT) model. In this model, the investor raises all the funds for mandatory expenses and provides financing, builds the plant and, after a certain plant operation period, transfers the plant to the national power organization. In this model, the object is to decrease the burden of power plants on the state budget. The most important issue in the BOT model is the dependence of the unit electricity cost on the transfer period. In this study, the model giving the unit electricity cost depending on the transfer of the plants established according to the BOT model, has been discussed. Unit electricity investment cost and unit electricity cost in relation to transfer period for plant types have been determined. Furthermore, unit electricity cost change depending on load factor, which is one of the parameters affecting annual electricity production, has been determined, and the results have been analyzed. This method can be employed for comparing the production costs of different plants that are planned to be established according to the BOT model, or it can be employed to determine the appropriateness of the BOT model.

  15. Economical analyses of build-operate-transfer model in establishing alternative power plants

    International Nuclear Information System (INIS)

    Yumurtaci, Zehra; Erdem, Hasan Hueseyin

    2007-01-01

    The most widely employed method to meet the increasing electricity demand is building new power plants. The most important issue in building new power plants is to find financial funds. Various models are employed, especially in developing countries, in order to overcome this problem and to find a financial source. One of these models is the build-operate-transfer (BOT) model. In this model, the investor raises all the funds for mandatory expenses and provides financing, builds the plant and, after a certain plant operation period, transfers the plant to the national power organization. In this model, the object is to decrease the burden of power plants on the state budget. The most important issue in the BOT model is the dependence of the unit electricity cost on the transfer period. In this study, the model giving the unit electricity cost depending on the transfer of the plants established according to the BOT model, has been discussed. Unit electricity investment cost and unit electricity cost in relation to transfer period for plant types have been determined. Furthermore, unit electricity cost change depending on load factor, which is one of the parameters affecting annual electricity production, has been determined, and the results have been analyzed. This method can be employed for comparing the production costs of different plants that are planned to be established according to the BOT model, or it can be employed to determine the appropriateness of the BOT model

  16. Operation reports of nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    The requirements aiming to standardize the program of nuclear power plant operation report, required by Brazilian Energy Commission - CNEN - to evaluate the activities related to the nuclear technical safety and to the radiation protection during the units operational phase, are showed. (E.G.) [pt

  17. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II's brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.)

  18. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    Energy Technology Data Exchange (ETDEWEB)

    Sillanpaeae, T [ed.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II`s brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.).

  19. Annual report on nuclear power station operational management, 1984

    International Nuclear Information System (INIS)

    1985-09-01

    As of the end of fiscal year 1984, 28 nuclear power plants were in operation in Japan, the total power output of which was 20.56 million kW, equivalent to 22.9 % of the total generated electric power in Japan. Now nuclear power generation bears a very important role in the stable supply and cost stabilization of electric power. The result of the capacity factor in fiscal year 1984 was 73.9 %, which showed that the nuclear power generation and safety management technologies in Japan are at the top level in the world. However, in order that nuclear power generation accomplishes the role as main power source sufficiently hereafter by increasing the number of plants, the reliability and economical efficiency must be further improved, and especially the safety management and operational management become important. For the purpose, the operational experience accumulated so far must be effectively utilized. In this book, the outline of the administration on the safety regulation of nuclear power generation, the state of operation of nuclear power plants, the state of accidents and failures, the state of regular inspections and so on are summarized. Also the state of radioactive waste management and the radiation control for workers are reported. (Kako, I.)

  20. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  1. Operational results in the Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Hasegawa, Kanichi; Kato, Katsuya; Terada, Hideo; Kamata, Takakage; Kaimura, Yoshiharu

    1986-01-01

    In the Onagawa Nuclear Power Station, Unit 1 (BWR type, with electric output 524 MW) started operation in June 1, 1984. The power plant has then continued non-stop operation up to April 2, 1985, thus exhibiting its base load plant. In fiscal 1984, the continuous operation is for 342 days; the capacity factor is about 96.1 %, which is the world's top. During the period, the radioactivity releases to the environment in both liquid and gaseous wastes are below the detection limits. The collective exposure dose for plant personnel is merely 6 man-rem. Subsequently, its 1st periodical inspection was started on April 3, 1985, and finished in July the same year. So, the power plant is now again in operation. (Mori, K.)

  2. Application of Modern Technologies for Nuclear Power Plant Productivity Improvements

    International Nuclear Information System (INIS)

    Joseph, A. Naser

    2011-01-01

    The nuclear power industry in several countries is concerned about the ability to maintain current high plant performance levels due to aging and obsolescence, knowledge drain, fewer plant staff, new requirements and commitments, unnecessary workloads and stress levels, and human errors. Current plant operations are labor-intensive due to the vast number of operational and support activities required by the commonly used technology in most plants. These concerns increase as plants extend their operating life. In addition, there is the desire by many plants to further improve performance while reducing human errors and increasingly focus on reducing operations and maintenance costs. New productivity improvement capabilities with measurable economic benefits are needed so that a successful business case can be made for their use. Improved and new instrumentation and control, human-system interface, information and communications technologies used properly can address concerns about cost-effectively maintaining current performance levels and enable shifts to even higher performance levels. This can be accomplished through the use of new technology implementations to improve productivity, reduce costs of systemic inefficiencies and avoid unexpected costs. Many of the same type of productivity improvements for operating plants will be applicable for new plants. As new plants are being built, it is important to include these productivity improvements or at least provide the ability to implement them easily later

  3. Statistical operation of nuclear power plants

    International Nuclear Information System (INIS)

    Gauzit, Maurice; Wilmart, Yves

    1976-01-01

    A comparison of the statistical operating results of nuclear power stations as issued in the literature shows that the values given for availability and the load factor often differ considerably from each other. This may be due to different definitions given to these terms or even to a poor translation from one language into another. A critical analysis of these terms as well as the choice of a parameter from which it is possible to have a quantitative idea of the actual quality of the operation obtained is proposed. The second section gives, on an homogenous basis and from the results supplied by 83 nuclear power stations now in operation, a statistical analysis of their operating results: in particular, the two light water lines, during 1975, as well as the evolution in terms of age, of the units or the starting conditions of the units during their first two operating years. Test values thus obtained are compared also to those taken 'a priori' as hypothesis in some economic studies [fr

  4. Nucleon Structure Functions from Operator Product Expansion on the Lattice.

    Science.gov (United States)

    Chambers, A J; Horsley, R; Nakamura, Y; Perlt, H; Rakow, P E L; Schierholz, G; Schiller, A; Somfleth, K; Young, R D; Zanotti, J M

    2017-06-16

    Deep-inelastic scattering, in the laboratory and on the lattice, is most instructive for understanding how the nucleon is built from quarks and gluons. The long-term goal is to compute the associated structure functions from first principles. So far this has been limited to model calculations. In this Letter we propose a new method to compute the structure functions directly from the virtual, all-encompassing Compton amplitude, utilizing the operator product expansion. This overcomes issues of renormalization and operator mixing, which so far have hindered lattice calculations of power corrections and higher moments.

  5. Operator psychological selection system for nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2004-01-01

    Based on a detailed job analysis of nuclear power plant operator including operation procedures analysis, interview with personnel familiar with operator job, and 9 events happened in the past in the plant involved operator error analysis, several operator work characteristics and performance influence factors are obtained. According to these specific characteristics and factors, referring to the psychological selection research results in the other related critical occupational fields, a full psychological selection system of nuclear power plant operator is forwarded in this paper, including 21 dimensions in 3 facets as general psychological ability, personality and psychological healthy. Practical measurement methods for the proposed selection dimensions are discussed in the end

  6. Nuclear electric power safety, operation, and control aspects

    CERN Document Server

    Knowles, J Brian

    2013-01-01

    Assesses the engineering of renewable sources for commercial power generation and discusses the safety, operation, and control aspects of nuclear electric power From an expert who advised the European Commission and UK government in the aftermath of Three Mile Island and Chernobyl comes a book that contains experienced engineering assessments of the options for replacing the existing, aged, fossil-fired power stations with renewable, gas-fired, or nuclear plants. From geothermal, solar, and wind to tidal and hydro generation, Nuclear Electric Power: Safety, Operation, and Control Aspects ass

  7. Operating experience of Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Ohteru, Shigeru; Kaneko, Jun; Kawahara, Toshio; Matsumoto, Mitsuo

    1987-01-01

    The prototype ATR 'Fugen' developed as one of the national project has verified the performance and reliability of the advanced thermal reactor system through the operation for about eight years since 1979, and the elucidation of the characteristics in plutonium utilization and the development and verification of the tuilizing techniques have been advanced. Besides, the operational results and the achievement of the technical development are successively reflected to the design of a demonstration reactor. In this paper, the outline of Fugan and the operational results are reported. The ATR Fugen Power Station is that of the prototype reactor of heavy water moderated, boiling light water cooled, pressure tube type, having the electric output of 165 MW. It started the full scale operation on March 20, 1979, and as of January, 1987, the total generated electric power reached about 7 billion kWh, the time of power generation was about 43,000 h, and the average capacity factor was 60.6 %. Plutonium utilization techniques, the flow characteristics and the dynamic plant characteristics of a pressure tube type reactor, the operational characteristics of a heavy water system and the techniques of handling heavy water containing tritium, and the operational reliability and maintainability of the machinery and equipment installed have been studied. (Kako, I.)

  8. Water and Climate Impacts on Power System Operations: The Importance of Cooling Systems and Demand Response Measures

    Energy Technology Data Exchange (ETDEWEB)

    Macknick, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zhou, Ella [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Connell, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miara, Ariel [City College of New York, NY (United States); Ibanez, Eduardo [GE Energy Connections, Atlanta, GA (United States); Hummon, Marissa [Tendril, Denver, CO (United States)

    2016-12-01

    The U.S. electricity sector is highly dependent upon water resources; changes in water temperatures and water availability can affect operational costs and the reliability of power systems. Despite the importance of water for power system operations, the effects of changes in water characteristics on multiple generators in a system are generally not modeled. Moreover, demand response measures, which can change the magnitude and timing of loads and can have beneficial impacts on power system operations, have not yet been evaluated in the context of water-related power vulnerabilities. This effort provides a first comprehensive vulnerability and cost analysis of water-related impacts on a modeled power system and the potential for demand response measures to address vulnerability and cost concerns. This study uniquely combines outputs and inputs of a water and power plant system model, production cost, model, and relative capacity value model to look at variations in cooling systems, policy-related thermal curtailments, and demand response measures to characterize costs and vulnerability for a test system. Twenty-five scenarios over the course of one year are considered: a baseline scenario as well as a suite of scenarios to evaluate six cooling system combinations, the inclusion or exclusion of policy-related thermal curtailments, and the inclusion or exclusion of demand response measures. A water and power plant system model is utilized to identify changes in power plant efficiencies resulting from ambient conditions, a production cost model operating at an hourly scale is used to calculate generation technology dispatch and costs, and a relative capacity value model is used to evaluate expected loss of carrying capacity for the test system.

  9. Tianwan nuclear power plant operation and management practices

    International Nuclear Information System (INIS)

    Gu Yingbing

    2010-01-01

    Tianwan Nuclear Power Station is a high-tech cooperation project in nuclear sector in the spirit of promoting the political relationship, economic trading and international strategic partnership between China and Russia. It was listed as one of the key nuclear projects to be constructed during the 'Ninth Five-Year' Plan. In this article the author summarizes and feedbacks the practices of operation management in Tianwan Nuclear Power Station in 7 aspects of safety culture construction, operation team building, daily operation management, operation document management, plant chemistry control and management, solid, liquid and gaseous waste management and control of operation performance indicators. (author)

  10. 47 CFR 73.664 - Determining operating power.

    Science.gov (United States)

    2010-10-01

    ... BROADCAST SERVICES Television Broadcast Stations § 73.664 Determining operating power. (a) The operating... substantially zero reactance and a resistance equal to the transmission line characteristic impedance. During...

  11. Nuclear power plants electrical retrofitting for cost effectiveness, reliability and operating efficiency

    International Nuclear Information System (INIS)

    Ciufu, L.; Popescu, M. O.

    2016-01-01

    In the context of continuous fast growing of the energy demand the current power plants retrofitting concept may represent an important step in the emission reduction, being able to offer in the same time a maximum operating efficiency. This desideratum can be obtained by implementing a rigorous energy management plan, based on an increased energy production capacity of non-pollutant electrical power plants and future-oriented frame on extending their lifetime operation. This management is focused on using state-of-art electronic, electrical and industrial control equipments, which can represent a real key factor. Thus, in this paper an analysis of the electrical system retrofitting is presented. As a part of this research the authors propose and simulate ambitious ways to upgrade actual control and command of the electrical operating systems, by promoting variable speed for large pumps and also computer software, as SCADA, for an intelligent control and monitoring of these studied processes. (authors)

  12. Atomic power plant and its operation method

    International Nuclear Information System (INIS)

    Yamamoto, Fumiaki; Higashio, Satoru.

    1986-01-01

    Purpose: To improve operation performance by partially restraining local over power in the axial power distribution of the reactor core by properly controlling the reactor pressure and furthermore by smoothly and properly performing reactor start-up operation in a short time while maintaining fuel integrity. Method: With the reactor pressure input to the pressure controller from the pressure detector, the valve opening of the main steam adjusting valve is adjusted so that the pressure will decrease when the reactor is started up. Also the adjusting valve is controlled so that the pressure will be lower than the set value of rated pressure, thus changing the axial distribution of void. In the meantime, with the stored state of xenon stored along with the increase of reactor power taken into consideration, the reactor pressure is increased as high as the rated value until the reactor power reaches to the rated power, thereby alleviating the local increase of reactor power without changing the whole reactor power and also enabling substantial reduction of reactor start-up time while maintaining reactor integrity. (Horiuchi, T.)

  13. Follow-up for the years 2000-2002 of productivity studies for the operation of CLAB

    International Nuclear Information System (INIS)

    Lundberg, Haakan

    2003-04-01

    SKB hands every year over, on behalf of the power companies, to SKI a cost calculation for spent fuel handling and dismantling of the Swedish nuclear power plants. SKI has tried to investigate the future impact which the growth of money in the Nuclear Waste Fund might give in relation to the change of consumer price index, CPI. The long term yield of the Fund has been related to the change of CPI, as the bigger part of the fund money has been invested in real interest rate bonds, issued by the Swedish state. The cost development has been studied with an index named 'KBS-3-index', which is a basket of weighted factor price indexes based on the SKB programme. Since 1986 and up to 2002, the KBS-3-index has increased about 102%, but CPI only about 70%. If this discrepancy should continue during the whole period when Fund money should be available, the Fund would be insufficient. But the difference between KBS-3-index and CPI might be eliminated due to a future productivity development. At the moment, SKI has no knowledge about future productivity development in the SKB programme. A closer analysis of the productivity and efficiency development in the facilities operated by SKB is therefore applicable. Nearest to study is the productivity at the operation of CLAB, Central Interim Storage Facility for Spent Nuclear Fuel. The work in CLAB is receiving and storing of spent nuclear fuel and core components. The consumption of all production factors can be measured in economical means. Here the total production factors are defined as the sum of the annual operation costs and the sum of annuities for reinvestments during the year. The development of total productivity is increasing slightly, but decreasing in the end. Normal for a new business is that the productivity is rising sharply in the beginning. Here the productivity is slightly decreasing in the beginning, and then rising, decreasing, rising and finally decreasing. The project 'compact storing' was finished in 1992

  14. Nuclear power plant operational data compilation system

    International Nuclear Information System (INIS)

    Silberberg, S.

    1980-01-01

    Electricite de France R and D Division has set up a nuclear power plant operational data compilation system. This data bank, created through American documents allows results about plant operation and operational material behaviour to be given. At present, French units at commercial operation are taken into account. Results obtained after five years of data bank operation are given. (author)

  15. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  16. Design and development of high voltage high power operational ...

    Indian Academy of Sciences (India)

    Applications of power operational amplifiers (opamps) are increasing day by day in the industry as they are used in audio amplifiers, Piezo transducer systems and the electron deflection systems. Power operational amplifiers have all the features of a general purpose opamp except the additional power handling capability.

  17. Argentina's operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Goldstein, M.; Palamidessi, H.

    1996-01-01

    The development of operator support systems for nuclear power plants started in Argentina a few years ago. Four systems are at present deployed or under development. The participation of utility personnel in the co-ordinated research program has helped in revising the current experience and in selecting and specifying the systems to be developed and the resources needed for their implementation. Main efforts will be aimed to the selection of those systems that can be more easily implemented, to improve the data retrieval and handling, to develop diverse supplies of software products and to promote the understanding of support systems among the potential end users. (author). 12 refs

  18. Approximation by max-product type operators

    CERN Document Server

    Bede, Barnabás; Gal, Sorin G

    2016-01-01

    This monograph presents a broad treatment of developments in an area of constructive approximation involving the so-called "max-product" type operators. The exposition highlights the max-product operators as those which allow one to obtain, in many cases, more valuable estimates than those obtained by classical approaches. The text considers a wide variety of operators which are studied for a number of interesting problems such as quantitative estimates, convergence, saturation results, localization, to name several. Additionally, the book discusses the perfect analogies between the probabilistic approaches of the classical Bernstein type operators and of the classical convolution operators (non-periodic and periodic cases), and the possibilistic approaches of the max-product variants of these operators. These approaches allow for two natural interpretations of the max-product Bernstein type operators and convolution type operators: firstly, as possibilistic expectations of some fuzzy variables, and secondly,...

  19. Power operation, measurement and methods of calculation of power distribution

    International Nuclear Information System (INIS)

    Lindahl, S.O.; Bernander, O.; Olsson, S.

    1982-01-01

    During the initial fuel loading of a BWR core, extensive checks and measurements of the fuel are performed. The measurements are designed to verify that the reactor can always be safely operated in compliance with the regulatory constraints. The power distribution within the reactor core is evaluated by means of instrumentation and elaborate computer calculations. The power distribution forms the basis for the evaluation of thermal limits. The behaviour of the reactor during the ordinary modes of operation as well as during transients shall be well understood and such that the integrity of the fuel and the reactor systems is always well preserved. (author)

  20. Product Operations Status Summary Metrics

    Science.gov (United States)

    Takagi, Atsuya; Toole, Nicholas

    2010-01-01

    The Product Operations Status Summary Metrics (POSSUM) computer program provides a readable view into the state of the Phoenix Operations Product Generation Subsystem (OPGS) data pipeline. POSSUM provides a user interface that can search the data store, collect product metadata, and display the results in an easily-readable layout. It was designed with flexibility in mind for support in future missions. Flexibility over various data store hierarchies is provided through the disk-searching facilities of Marsviewer. This is a proven program that has been in operational use since the first day of the Phoenix mission.

  1. Virtual Power Plants as a Model for the Competitiveness of Small Manufacturers and Operators of Virtual Power Plants in Markets of Electricity and Gas

    International Nuclear Information System (INIS)

    Galic, T.; Tomsic, Z.

    2012-01-01

    Production of electricity from renewable energy sources and energy-efficient power sources to be connected to the electricity distribution network is still not competitive with electricity production from conventional sources of electricity. A powerful technological development of distributed energy sources and technologies for electricity storage has reduced their production costs, production costs of electricity from distributed energy sources, the costs of simultaneous production of electricity and thermal energy from cogeneration distributed energy sources and thus has facilitated their increased use in practice. It also allows them to interconnect systems such as virtual power plants in order to achieve full economic feasibility of their use. Current electricity and gas customers, now also in the role of small power producers, interconnected by virtual power plants operators, in addition to buying electricity and gas on retail markets for electricity and gas, will be able to sell electricity and new energy services also on wholesale electricity markets. Development and application of new distributed technologies will enable the production of new quantities of electricity which will increase the competitiveness of electricity producers, competitiveness of electricity suppliers of end-customers and elasticity of supply and demand in the electricity market. These processes will also increase the efficiency of the entire systems of electricity supply and of the gas supply systems.(author)

  2. Centralized operation and monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Kudo, Mitsuru; Sato, Hideyuki; Murata, Fumio

    1988-01-01

    According to the prospect of long term energy demand, in 2000, the nuclear power generation facilities in Japan are expected to take 15.9% of the total energy demand. From this fact, it is an important subject to supply nuclear power more stably, and in the field of instrumentation and control, many researches and developments and the incessant effort of improvement have been continued. In the central operation and monitoring system which is the center of the stable operation of nuclear power plants, the man-machine technology aiding operators by electronic and computer application technologies has been positively developed and applied. It is considered that hereafter, for the purpose of rationally heightening the operation reliability of the plants, the high quality man-machine system freely using the most advanced technologies such as high reliability digital technology, optical information transmission, knowledge engineering and so on is developed and applied. The technical trend of operation and monitoring system, the concept of heightening operation and monitoring capability, the upgrading of operation and monitoring system, and the latest operation, monitoring and control systems for nuclear power plants and waste treatment facilities are described. (K.I.)

  3. Change-management. From commercial power operation to post power operation and decommissioning; Change-Management. Vom Leistungsbetrieb ueber den Nachbetrieb zum Rueckbau. T. 1. Stilllegung und Rueckbau von Reaktoren und Anlagen im Brennstoffkreislauf durch AREVA

    Energy Technology Data Exchange (ETDEWEB)

    Wasinger, Karl [AREVA GmbH, Offenbach am Main (Germany)

    2015-02-15

    Transition from power generation to decommissioning challenges utilities. Power generation is mainly characterized by a stable working environment and constant workload, decommissioning and dismantling, however, by transformation and change. Also, changing requirements for the workforce's skills challenge the organization and its senior management. Ensuring effective and efficient performance, while maintaining motivation of staff, requires adjustment of management processes as well as of operational organization and human resources management. AREVA has more than 20 years of experience in decommissioning of own nuclear fuel cycle plants in France, as well as of other large plants and power reactors in Germany, the United Kingdom and the US. Therefore, the group has developed and successfully implemented integrated change management processes. The implementation of well-established and proven methods, developed by the productive industry and adjusted to the nuclear regulatory requirements, significantly improves the performance and efficiency of means and methods in use. The AREVA Performance Improvement Process defines concrete approaches to identify and improve potential deficits of productivity in six main areas (decommissioning scenarios and stra-tegies, waste treatment and logistics, operations management, supply chain, regulatory monitoring and controls as well as dismantling operation). Nuclear plant and facility owners around the world benefit from AREVA experts well experienced in execution of large and complex decommissioning projects.

  4. Simplified reactive power management strategy for complex power grids under stochastic operation and incomplete information

    DEFF Research Database (Denmark)

    Vlachogiannis, Ioannis (John)

    2009-01-01

    grids is a major issue for system operators. Under these circumstances an online reactive power management strategy with minimum risk concerning all uncertain and stochastic parameters is proposed. Therefore, new concepts such as reactive power-weighted node-to-node linking and reactive power control......In the current released energy market, the large-scale complex transmission networks and the distribution ones with dispersed energy sources and "intelligent" components operate under uncertainties, stochastic and prior incomplete information. A safe and reliable operation of such complex power...... capability are introduced. A distributed and interconnected stochastic learning automata system is implemented to manage, in a unified and unique way, the reactive power in complex power grids with stochastic reactive power demand and detect the vulnerable part. The proposed simplified strategy can also...

  5. Assessment of advanced small-scale combined heat and power production

    Energy Technology Data Exchange (ETDEWEB)

    Spitzer, J. [Joanneum Research (Austria)

    1996-12-31

    To increase the share of renewable energy sources, bioenergy has to be used for electricity generation, preferably in combined heat and power (CHP) production systems, besides its traditional use in space heating. The need for small-scale, i.e. below 5 MW{sub el}, CHP production arises from the fact that a considerable portion of the available solid biofuels may not be transported over long distances for economic reasons and that in many cases the heat demand is below 10 MW{sub el} in district heating schemes in communities with less than 10 000 inhabitants. The available technical options have to be assessed with respect to performance, reliability and economy. Such an assessment has been performed in a study where the following options have been compared: Gasification - combustion engine or gas turbine; Combustion - steam turbine/engine; Combustion - hot air turbine; Combustion - Stirling engine. While conventional steam cycle systems are available and reliable they are generally not economical in the power range under consideration. Among the other systems, which are not yet commercially available, the Stirling engine system seems to be attractive in the power range below 500 kW{sub el} and the hot air system could close the gap to the steam cycle systems, i.e. cover the power range between 0.5 and 5.0 MW{sub el}. Gasification schemes seem less suitable: The power generation part (combustion engine and gas turbine) is well established for natural gas, with the combustion engine in the lower (<5 MW{sub el}) and the gas turbine in the higher (>5MW{sub el}) power range. However, the gas quality needed for the operation of a combustion engine requires expensive pre-treatment of the gas from wood gasification so that this scheme is less attractive for the power range under consideration. These conclusions lead to R and D efforts in Austria in two directions: Hot air turbine: A utility demonstration plant is under construction with a power of 1 600 kW{sub el

  6. Assessment of advanced small-scale combined heat and power production

    Energy Technology Data Exchange (ETDEWEB)

    Spitzer, J [Joanneum Research (Austria)

    1997-12-31

    To increase the share of renewable energy sources, bioenergy has to be used for electricity generation, preferably in combined heat and power (CHP) production systems, besides its traditional use in space heating. The need for small-scale, i.e. below 5 MW{sub el}, CHP production arises from the fact that a considerable portion of the available solid biofuels may not be transported over long distances for economic reasons and that in many cases the heat demand is below 10 MW{sub el} in district heating schemes in communities with less than 10 000 inhabitants. The available technical options have to be assessed with respect to performance, reliability and economy. Such an assessment has been performed in a study where the following options have been compared: Gasification - combustion engine or gas turbine; Combustion - steam turbine/engine; Combustion - hot air turbine; Combustion - Stirling engine. While conventional steam cycle systems are available and reliable they are generally not economical in the power range under consideration. Among the other systems, which are not yet commercially available, the Stirling engine system seems to be attractive in the power range below 500 kW{sub el} and the hot air system could close the gap to the steam cycle systems, i.e. cover the power range between 0.5 and 5.0 MW{sub el}. Gasification schemes seem less suitable: The power generation part (combustion engine and gas turbine) is well established for natural gas, with the combustion engine in the lower (<5 MW{sub el}) and the gas turbine in the higher (>5MW{sub el}) power range. However, the gas quality needed for the operation of a combustion engine requires expensive pre-treatment of the gas from wood gasification so that this scheme is less attractive for the power range under consideration. These conclusions lead to R and D efforts in Austria in two directions: Hot air turbine: A utility demonstration plant is under construction with a power of 1 600 kW{sub el

  7. Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

    Energy Technology Data Exchange (ETDEWEB)

    Dan Wendt; Greg Mines

    2014-09-01

    Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

  8. Maintaining the safe operation of U.S. nuclear power plants

    International Nuclear Information System (INIS)

    Skavdahl, R.E.

    1991-01-01

    The more than one hundred nuclear power plants in the U.S. are a vital resource that provides about 20% of the electrical power production. Although about half the plants are more than 15 years old, there is no evidence of age-related deterioration in any of the key indicators of industry performance; indeed, the continuing improvement in all these indicators shows the industry is maturing, not growing old. The Institute for Nuclear Power Operations's performance assessment and training programs have spurred a heavy industry-wide commitment to improved training. These efforts are the key to excellence in the performance of operations and maintenance personnel. The interface between the reactor and the operator has been improved through control room design reviews, the implementation of a Safety Parameter Display System, and emergency procedure guidelines. These improvements ensure that the operators will be able to perform their functions under any circumstances they may encounter. Led by NUMARC, the industry initiative to improve plant maintenance programs incorporates such elements as the INPO performance standards, enhanced monitoring through the use of the Nuclear Plant Reliability Data System, Reliability Centered Maintenance, and improvements in plant technical specifications. These elements bring the latest available technology to plant maintenance programs. Equipment replacements are frequently made to take advantage of improvements in technology. Aside from the performance enhancements they offer, such replacements also serve to keep the plants young. By leveraging their resources through the owners groups, utilities are able to quickly and efficiently solve problems together that they could not afford to attack individually. Even the highly unlikely hypothetical severe accidents are addressed in a systematic fashion through the application of Probabilistic Risk Assessments. 15 figs

  9. Measurement uncertainty recapture (MUR) power uprates operation at Kuosheng Nuclear Power Station

    International Nuclear Information System (INIS)

    Chang Chinjang; Wang Tunglu; Lin Chihpao

    2009-01-01

    Measurement Uncertainty Recapture PowerUprates (MUR PU) are achieved through the use of state-of-the-art feedwater flow measurement devices, i.e., ultrasonic flow meters (UFMs), that reduce the degree of uncertainty associated with feedwater flow measurement and in turn provide for a more accurate calculation of thermal power. The Institute of Nuclear Energy Research (INER) teamed with Sargent and Lundy, LLC (S and L), Pacific Engineers and Constructors, Ltd (PECL), and AREVA to develop a program and plan for the Kuosheng Nuclear Power Station (KNPS) MUR PU Engineering Service Project and for the assistance to Kuosheng MUR PU operation. After regulator's approval of the licensing requests, KSNPS conducted the power ascension test and switchover to the new rated thermal power for Unit 2 and Unit 1 on 7/7/2007 and 11/30/2007, respectively. From then on, KNPS became the first nuclear power plant implementing MUR PU operation in Taiwan and in Asia. (author)

  10. Evaluation of nuclear power plant operator's ability

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2004-01-01

    Based on the quantitative research on nuclear power plant (NPP) operator's psychological characteristics and performance, the Borda's method of fuzzy mathematics combined with the character of operator's task is used to evaluate their abilities. The result provides the reference for operator's reliability research and psychological evaluation. (author)

  11. The safety approach in the operation of EDF power plants

    International Nuclear Information System (INIS)

    Bertron, L.; Mira, J.J.

    1988-01-01

    To get a view on what is involved in maintaining a high level of safety in the operation of EdF nuclear power plants, it may be recalled that in 1987, 76 % of the EdF production was nuclear. The nuclear plants include thirty-four standard PWR 900 plants, fourteen PWR 1300 plants, the 305 MW SENA PWR, the four 500 MW GCR: CHINON A3 plant, St-LAURENT A1 (390 MW), A2 (450 MW) and BUGEY 1 (540 MW), the 233 MW PHENIX fast breeder reactor and the CREYS-MALVILLE 1200 MW fast breeder reactor, now being prepared for a new startup after the 1987 incident. So the importance of a safe operation of this investment is considerable for EdF, which is the designer, owner, industrial architect and operator. According to the French regulations, EdF is responsible for the safe operation of its power plants. A considerable human component is also at stake, as the safe operation of plants implies all the personnel to varying degrees. There are 15,000 such employees, all of whom have to be trained, competent and motivated. The operation of this system for 340 reactor-years has to-date resulted in no incident of any significant impact on the environment. Right from the start, safety in operation has always been an essential and clearly stated priority. Among other lessons the Three-Mile Island and Chernobyl accidents have reinforced the conviction that the human factors, the man-machine interface, and the safety culture were determining elements. With forty-eigh PWR plants in service, the problem is to maintain safe operation of a system now running at cruising speed, but also including some units (particularly the GCRs) that must be prepared for decommissioning. In addition EDF has to demonstrate the safe operations of CREYS MALVILLE, fast breeder reactor

  12. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  13. Energy Storage in Power System Operation: The Power Nodes Modeling Framework

    DEFF Research Database (Denmark)

    Heussen, Kai; Koch, Stephan; Ulbig, Andreas

    2010-01-01

    for designing operation strategies for power systems based on ubiquitous energy storage, for example to buer non-dispatchable generation, as well as for the evaluation of the operational performance in terms of energy eciency, reliability and cost. After introducing the modeling approach and a categorization......In this paper, a novel concept for the description of energy storage in power systems with dispatchable and non-dispatchable generators and loads is presented. It is based on a system-perspective consideration of energy storage, generation and consumption. This means that grid-relevant aspects...

  14. Evaluation of the electric power production cost growth due to decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Basso, G.

    1982-01-01

    The increase of production cost for electric power generated by nuclear plants, due to their decommissioning and the end of operating life, is analysed in respect to (a) waiting time from indefinite shut-down date to the start of dismantlement, (b) financing method, (c) interest and inflation rates. The analysis shows that the additional cost is always small for those solutions which have higher probability to be adopted

  15. Modeling and Economic Analysis of Power Grid Operations in a Water Constrained System

    Science.gov (United States)

    Zhou, Z.; Xia, Y.; Veselka, T.; Yan, E.; Betrie, G.; Qiu, F.

    2016-12-01

    The power sector is the largest water user in the United States. Depending on the cooling technology employed at a facility, steam-electric power stations withdrawal and consume large amounts of water for each megawatt hour of electricity generated. The amounts are dependent on many factors, including ambient air and water temperatures, cooling technology, etc. Water demands from most economic sectors are typically highest during summertime. For most systems, this coincides with peak electricity demand and consequently a high demand for thermal power plant cooling water. Supplies however are sometimes limited due to seasonal precipitation fluctuations including sporadic droughts that lead to water scarcity. When this occurs there is an impact on both unit commitments and the real-time dispatch. In this work, we model the cooling efficiency of several different types of thermal power generation technologies as a function of power output level and daily temperature profiles. Unit specific relationships are then integrated in a power grid operational model that minimizes total grid production cost while reliably meeting hourly loads. Grid operation is subject to power plant physical constraints, transmission limitations, water availability and environmental constraints such as power plant water exit temperature limits. The model is applied to a standard IEEE-118 bus system under various water availability scenarios. Results show that water availability has a significant impact on power grid economics.

  16. Decomposing Objectives and Functions in Power System Operation and Control

    DEFF Research Database (Denmark)

    Heussen, Kai; Lind, Morten

    2009-01-01

    mix of challenges posed by renewable energy sources, demand response technologies and smartgrid concepts, affecting all areas of power system operation. Both, new control modes and changes in market design are required. This paper presents a mean-ends perspective to the analysis of the control......The introduction of many new energy solutions requires the adaptation of classical operation paradigms in power systems. In the standard paradigm, a power system is some equivalent of a synchronous generators, a power line and an uncontrollable load. This paradigm has been challenged by a diverse...... structures and operation paradigms in present power systems. In a top-down approach, traditional frequency- and area-control mechanisms are formalized. It is demonstrated that future power system operation paradigms with different generation control modes and controllable demand can be modeled in a coherent...

  17. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  18. Quality assurance during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1994-01-01

    The general requirements applicable to the quality assurance of the Finnish nuclear power plants are presented in the Council of State Decision (395/91) and in the guide YVL 1.4. This guide specifies the quality assurance requirements to be applied during the operation of the nuclear power plants as well as of the other nuclear facilities. Quality assurance applies to all the activities and organizations with a bearing on the safe operation of the nuclear power plants. (5 refs.)

  19. Efficient operation of a multi-purpose reservoir in Chile: Tradeoffs between irrigation and hydropower production

    Science.gov (United States)

    Gonzalez Cabrera, J. M., Sr.; Olivares, M. A.

    2015-12-01

    This study proposes a method to develop efficient operational policies for a reservoir the southern Chile. The main water uses in this system are hydropower and irrigation, with conflicting seasonal demands. The conflict between these two uses is currently managed through a so-called "irrigation agreement" which defines a series of operational conditions on the reservoir by restricting volumes used for power production depending on reservoir storage level. Other than that, the reservoir operation is driven by cost-minimization over the power grid. Recent evidence shows an increasing degree of conflict in this basin, which suggests that the static approach of irrigation agreements, might no longer be appropriate. Moreover, this agreement could be revised in light of decreased water availability. This problem poses a challenge related to the spatial scope of analysis. Thus, irrigation benefits are driven by decisions made within the basin, whereas hydropower benefits depend on the operation of the entire power grid. Exploring the tradeoffs between these two water uses involves modeling both scales. The proposed methodology integrates information from both a grid-wide power operations model and a basin-wide agro-economic model into a decision model for optimal reservoir operation. The first model, a hydrothermal coordination tool, schedules power production by each plant in the grid, and allows capturing technical and economic aspects to the operation of hydropower reservoirs. The agro-economic model incorporates economic features of irrigation in the basin, and allows obtaining irrigation water demand functions. Finally, the results of both models are integrated into a single model for optimal reservoir operation considering the tradeoffs between the two uses. The result of the joint operation of water resources, show a flexible coordination of uses, revealing the opportunity cost of irrigation, which it gives the possibility of negotiating transfers of water to

  20. Operating experience with nuclear power stations in Member States in 2005

    International Nuclear Information System (INIS)

    2006-10-01

    difficulty in reporting unavailability in energy due to external causes with relation to energy losses due to load following operation and grid limitation. It should be noted that, for load, operation and unavailability factors, there might be differences between the data of this report and those published elsewhere. To avoid confusion, reference should be made to the definitions given in Section 3. In Section 4 this report presents figures illustrating worldwide performance indicators up to 2005. According to the information available to the Agency at the end of 2005, there were 443 nuclear power reactors operating in the world, with a total net capacity of 369.6 GW (e) . Four new reactor units were connected to the grid in 2005 (two in Japan and one each in India and the South Korea), and one laid-up plant was reconnected in Canada. There were two NPP retirements in 2005 - one 340 MW (e) reactor in Germany and the one 600 MW (e) reactor in Sweden. This compares to five retirements in 2004. At the end of 2005 here were 27 nuclear power plants under construction in the world with a total net capacity 21.8 GW (e) . Construction began on three NPPs in 2005, Finland's 1600 MW (e) PWR (EPR) reactor, China's 1000 MW (e) PWR and Pakistan's 300 MW (e) PWR. In addition, active construction has resumed on two NPPs in the Bulgaria. The scope of publication has been enhanced by information related to non-electrical application of nuclear power reactors. The Chapter 7 consists of production data related to district heating, industrial process heat delivery and to water desalination process. In 2005 the nuclear energy was utilized for nonelectrical application in 9 Member States involving energy from 66 nuclear reactors. This publication includes information received by the Agency up to 1 September 2005. Up to this date data from all operating units had been reported. Any data modification received after that date, although not included in this publication, is available in the PRIS

  1. Operating experience with nuclear power stations in Member States in 2006

    International Nuclear Information System (INIS)

    2007-08-01

    operation and grid limitation. It should be noted that, for load, operation and unavailability factors, there might be differences between the data of this report and those published elsewhere. To avoid confusion, reference should be made to the definitions given in Section 3. In Section 4 this report presents figures illustrating worldwide performance indicators up to 2006. According to the information available to the Agency at the end of 2006, there were 435 nuclear power reactors operating in the world, with a total net capacity of 369.7 GW (e) . Two new reactor units were connected to the grid in 2006 (one each in China and India). There were eight nuclear power reactors retirements in 2006 - two reactors in Bulgaria (918 MW (e) , one 142 MW (e) reactor in Spain, one 408 MW (e) reactor in Slovakia and four reactors (870 MW (e) in the UK. This compares to two retirements in 2005 and five in 2004. At the end of 2006 here were 29 nuclear power plants under construction in the world with a total net capacity 23.6 GW (e) . Construction began on four NPPs in 2006: Lingao-4 (1000 MW (e) and Qinshan II-3 (610 MW (e) in China, Shin Kori-1 (960 MW (e) in the Republic of Korea and construction resumption at Beloyarsk-4 (750 MW (e) in Russia. The scope of publication has been enhanced by information related to nonelectrical application of nuclear power reactors. The Chapter 6 consists of production data related to district heating, industrial process heat delivery and to water desalination process. In 2006 the nuclear energy was utilized for non-electrical application in 11 Member States involving energy from 71 nuclear reactors. This publication includes information received by the Agency up to 15 June 2007. Up to this date data from all operating units had been reported. Any data modification received after that date, although not included in this publication, is available in the PRIS database. The information contained in the report was made available to the Agency through

  2. Economic evaluation of nuclear reactor operation utilizing power effect

    International Nuclear Information System (INIS)

    Budinsky, M.; Mydliar, J.

    1988-01-01

    The operation of a reactor at the so-called power effect may substantially increase the burnup of fuel to be removed. The aim of the evaluation of such reactor operation is the optimal determination of the time over which the yield of the higher use of fuel exceeds economic losses resulting from the increased share of constant expenditure of the price of generated kWh of electric power which ensues from such operation. A mathematical model is presented for such evaluation of reactor operation with regard to benefits for the national economy which is the basis of the ESTER 2 computer program. The calculations show that the prices of generated and delivered kWh are minimally 2% less than the prices of generated power without the power effect use. The minimum ranges in the interval of 30 to 50 days. The dependence of the price of generated and delivered kWh from the point of view of the operator of the power plant as well as the component of fuel price of generated kWh will not reach the minimum even after 50 days of operation. From the operating and physical points of view the duration of power effect is not expected to exceed 20 to 30 days which means that from the point of view of the national economy the price of generated and delivered kWh will be 1.6 to 2% less and the fuel component of the price of the generated kWh will be 3 to 4.5% lower. (Z.M.). 5 figs., 3 refs

  3. Annual report on operational management of nuclear power stations, 1979-1980

    International Nuclear Information System (INIS)

    1981-04-01

    This report was compiled by the Agency of Natural Resoures and Energy. The commercial nuclear power stations in Japan started the operation in 1966 for the first time, and as of the end of March, 1981, 22 plants with more than 15.5 million kW capacity were in operation. Nuclear power generation is regarded as the top-rated substitute energy for petroleum, and the target of its development in 1990 is about 52 million kW. The government and the people are exerting utmost efforts to attain the target. The result of the rate of operation of nuclear power stations reached 60.8% in 1980, but it is important to maintain the good, stable state of operation by perfecting the operational management hereafter in order to establish the position of LWRs. At present, the operational management officers of the government stay in nationwide power stations, and supervise the state of operations, thus the system of operational management was strengthened after the Three Mile Island accident in the U.S., and the improvement in the rate of operation is expected. A table shows the nuclear power stations in operation and under construction. The state of operations of individual nuclear power plants in 1979 and 1980, the accidents and failures occurred in nuclear power plants from 1966 to 1980, the minor troubles, the conditions in the regular inspections of individual nuclear power plants, radioactive waste management and the radiation exposure of workers are reported. (Kako, I.)

  4. Power Product Equipment Technician: Outboard-Engine Systems and Service. Teacher Edition [and] Student Edition.

    Science.gov (United States)

    Hilley, Robert

    This curriculum guide contains teacher and student materials for a course on outboard-engine boat systems and service for power product equipment technician occupations. The course contains the following four units of instruction: (1) Outboard-Engine Design and Identification; (2) Operation and Service of Engine-Support Systems; (3) Operation and…

  5. Designing for Wide-Area Situation Awareness in Future Power Grid Operations

    Science.gov (United States)

    Tran, Fiona F.

    Power grid operation uncertainty and complexity continue to increase with the rise of electricity market deregulation, renewable generation, and interconnectedness between multiple jurisdictions. Human operators need appropriate wide-area visualizations to help them monitor system status to ensure reliable operation of the interconnected power grid. We observed transmission operations at a control centre, conducted critical incident interviews, and led focus group sessions with operators. The results informed a Work Domain Analysis of power grid operations, which in turn informed an Ecological Interface Design concept for wide-area monitoring. I validated design concepts through tabletop discussions and a usability evaluation with operators, earning a mean System Usability Scale score of 77 out of 90. The design concepts aim to support an operator's complete and accurate understanding of the power grid state, which operators increasingly require due to the critical nature of power grid infrastructure and growing sources of system uncertainty.

  6. Operation and sizing of energy storage for wind power plants in a market system

    International Nuclear Information System (INIS)

    Korpaas, M.; Holen, A.T.

    2003-01-01

    This paper presents a method for the scheduling and operation of energy storage for wind power plants in electricity markets. A dynamic programming algorithm is employed to determine the optimal energy exchange with the market for a specified scheduling period, taking into account transmission constraints. During operation, the energy storage is used to smooth variations in wind power production in order to follow the scheduling plan. The method is suitable for any type of energy storage and is also useful for other intermittent energy resources than wind. An application of the method to a case study is also presented, where the impact of energy storage sizing and wind forecasting accuracy on system operation and economics are emphasized. Simulation results show that energy storage makes it possible for owners of wind power plants to take advantage of variations in the spot price, by thus increasing the value of wind power in electricity markets. With present price estimates, energy storage devices such as reversible fuel cells are likely to be a more expensive alternative than grid expansions for the siting of wind farms in weak networks. However, for areas where grid expansions lead to unwanted interference with the local environment, energy storage should be considered as a reasonable way to increase the penetration of wind power. (author)

  7. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-08-01

    During the first quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 32.5% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 99.0%. An international nuclear event scale has been introduced for the classification of nuclear power plant events according to their nuclear and radiation safety significance. The scale first undergoes about a year long trial period in several countries. on the scale, events are divided into levels from 1 to 7 of which events at Level 7 are the most serious. Furthermore, Level 0 (Below Scale) is used for events with no safety significance. All events which occurred at the Finnish nuclear power plants this quarter are classified as Level 0. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. At the Loviisa plant, a back-up emergency feedwater system independent of the plant's other systems has been introduced which offers a new, alternative means of removing residual heat from the reactor. Owing to this system, the risk of a severe accident has been further reduced. At the TVO plants, systems have been introduced by which accident sequences which lead to containment failure could be eliminated and the consequences of a potential severe accident could be mitigated. In this report, also the release of short-lived radioactive materials along the transfer route of an irradiated sample is described which occured at the FiR 1 research reactor. The amounts of radioactive materials individuals received in their bodies in connection with this event were very low

  8. The Possibility Using the Power Production Function of Complex Variable for Economic Forecasting

    Directory of Open Access Journals (Sweden)

    Sergey Gennadyevich Svetunkov

    2016-09-01

    Full Text Available The possibility of dynamic analysis and forecasting production results using the power production functions of complex variables with real coefficients is considered. This model expands the arsenal of instrumental methods and allows multivariate production forecasts which are unattainable by other methods of real variables as the functions of complex variables simulate the production differently in comparison with the models of real variables. The values of coefficients of the power production functions of complex variables can be calculated for each statistical observation. This allows to consider the change of the coefficients over time, to analyze this trend and predict the values of the coefficients for a given term, thereby to predict the form of the production function, which forecasts the operating results. Thus, the model of the production function with variable coefficients is introduced into the scientific circulation. With this model, the inverse problem of forecasting might be solved, such as the determination of the necessary quantities of labor and capital to achieve the desired operational results. The study is based on the principles of the modern methodology of complex-valued economy, one of its sections is the complex-valued patterns of production functions. In the article, the possibility of economic forecasting is tested on the example of the UK economy. The results of this prediction are compared with the forecasts obtained by other methods, which have led to the conclusion about the effectiveness of the proposed approach and the method of forecasting at the macro levels of production systems. A complex-valued power model of the production function is recommended for the multivariate prediction of sustainable production systems — the global economy, the economies of individual countries, major industries and regions.

  9. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-03-01

    In the third quarter of 1993, all of Finland's four nuclear power plant units were in power operation, with the exception of the annual maintenance outages of the Loviisa units. The load factor average of the plant units was 83.6 %. None of the events which occurred during this annual quarter had any bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  10. Liquid Nitrogen Temperature Operation of a Switching Power Converter

    Science.gov (United States)

    Ray, Biswajit; Gerber, Scott S.; Patterson, Richard L.; Myers, Ira T.

    1995-01-01

    The performance of a 42/28 V, 175 W, 50 kHz pulse-width modulated buck dc/dc switching power converter at liquid nitrogen temperature (LNT) is compared with room temperature operation. The power circuit as well as the control circuit of the converter, designed with commercially available components, were operated at LNT and resulted in a slight improvement in converter efficiency. The improvement in power MOSFET operation was offset by deteriorating performance of the output diode rectifier at LNT. Performance of the converter could be further improved at low temperatures by using only power MOSFET's as switches. The use of a resonant topology will further improve the circuit performance by reducing the switching noise and loss.

  11. Use of computer codes to improve nuclear power plant operation

    International Nuclear Information System (INIS)

    Misak, J.; Polak, V.; Filo, J.; Gatas, J.

    1985-01-01

    For safety and economic reasons, the scope for carrying out experiments on operational nuclear power plants (NPPs) is very limited and any changes in technical equipment and operating parameters or conditions have to be supported by theoretical calculations. In the Nuclear Power Plant Scientific Research Institute (NIIAEhS), computer codes are systematically used to analyse actual operating events, assess safety aspects of changes in equipment and operating conditions, optimize the conditions, preparation and analysis of NPP startup trials and review and amend operating instructions. In addition, calculation codes are gradually being introduced into power plant computer systems to perform real time processing of the parameters being measured. The paper describes a number of specific examples of the use of calculation codes for the thermohydraulic analysis of operating and accident conditions aimed at improving the operation of WWER-440 units at the Jaslovske Bohunice V-1 and V-2 nuclear power plants. These examples confirm that computer calculations are an effective way of solving operating problems and of further increasing the level of safety and economic efficiency of NPP operation. (author)

  12. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Besuner, P H; Grimsrud, P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A [Electric Supply Board, Dublin (Ireland)

    1999-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  13. Operation of Finnish nuclear power plants. Quarterly report, 4th quarter 1996

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-05-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants's production and load factors. In the fourth quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outage of Loviisa 2 and a shutdown at Olkiluoto 1 to repair a condensate system stop valve. The load factor average of all plant units was 96.5%. Events in the fourth quarter of 1996 were level 0 on the International Nuclear Event Scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  14. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Besuner, P.H.; Grimsrud, P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A. [Electric Supply Board, Dublin (Ireland)

    1998-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  15. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1995-10-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Fasety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and of the evironment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of the TVO plant units and for TVO II`s Midsummer outage which was due to low electricity demand, the Finnish nuclear power plants were in power operation during the second quarter of 1995. The load factor average of all four plant units was 91.2 %. Events during the second annual quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (4 figs., 4 tabs.).

  16. Tables of Products of Tensor Operators and Stevens Operators

    DEFF Research Database (Denmark)

    Lindgård, Per-Anker

    1975-01-01

    Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given.......Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given....

  17. Operation of Finnish nuclear power plants. Quarterly report, 1st quarter 1998

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-11-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. The Finnish NPP units were in power operation for the whole first quarter of 1998. All the units were in long-term test operation at uprated power level authorised by STUK. The load factor average of the plant units was 100.8%. An oil leak at Olkiluoto NPP Unit 2 caused an ignition that was promptly extinguished. A subsequent appraisal of the event disclosed deficiencies in the functioning of the plant unit's operating organization and the event was classified INES level 1. Other events in this quarter had no bearing on nuclear or radiation safety. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  18. Operating the Irish power system with increased levels of wind power

    DEFF Research Database (Denmark)

    Tuohy, A.; Denny, E.; Meibom, Peter

    2008-01-01

    This paper summarises some of the main impacts of large amounts of wind power installed in the island of Ireland. Using results from various studies performed on this system, it is shown that wind power will impact on all time frames, from seconds to daily planning of the system operation. Results...... from studies examining operation of the system with up to approximately 40% of electricity provided by wind show that some of the most important aspects to be considered include the type of wind turbine technology, the provision of reserve to accommodate wind forecasting error and the method used...

  19. Computerized operation manual (COM) of nuclear power plants

    International Nuclear Information System (INIS)

    Szegi, Z.

    1985-01-01

    This paper is to be presented at the International Seminar on Diagnoses of and Response to Abnormal Occurrences at Nuclear Power Plants organized by the International Atomic Energy Agency. The topic of presentation is the Computerized Operational Manual. This system supports the operator at disturbance situations by displaying quickly and unambiguously the operational instructions and the relevant information without mistakes. By the computerized manual the operator can determine the instruction-subsystem which reflects the real state of the power unit. From this point the system guides the operator on how to drive the unit to another determined state by providing the operational instructions at any time. A data bank is also included which contains information concerning rules restricting on maintenance and repair. The system will be realized at Paks NPP. (author)

  20. Utilizing Solar Power Technologies for On-Orbit Propellant Production

    Science.gov (United States)

    Fikes, John C.; Howell, Joe T.; Henley, Mark W.

    2006-01-01

    The cost of access to space beyond low Earth orbit may be reduced if vehicles can refuel in orbit. The cost of access to low Earth orbit may also be reduced by launching oxygen and hydrogen propellants in the form of water. To achieve this reduction in costs of access to low Earth orbit and beyond, a propellant depot is considered that electrolyzes water in orbit, then condenses and stores cryogenic oxygen and hydrogen. Power requirements for such a depot require Solar Power Satellite technologies. A propellant depot utilizing solar power technologies is discussed in this paper. The depot will be deployed in a 400 km circular equatorial orbit. It receives tanks of water launched into a lower orbit from Earth, converts the water to liquid hydrogen and oxygen, and stores up to 500 metric tons of cryogenic propellants. This requires a power system that is comparable to a large Solar Power Satellite capable of several 100 kW of energy. Power is supplied by a pair of solar arrays mounted perpendicular to the orbital plane, which rotates once per orbit to track the Sun. The majority of the power is used to run the electrolysis system. Thermal control is maintained by body-mounted radiators; these also provide some shielding against orbital debris. The propellant stored in the depot can support transportation from low Earth orbit to geostationary Earth orbit, the Moon, LaGrange points, Mars, etc. Emphasis is placed on the Water-Ice to Cryogen propellant production facility. A very high power system is required for cracking (electrolyzing) the water and condensing and refrigerating the resulting oxygen and hydrogen. For a propellant production rate of 500 metric tons (1,100,000 pounds) per year, an average electrical power supply of 100 s of kW is required. To make the most efficient use of space solar power, electrolysis is performed only during the portion of the orbit that the Depot is in sunlight, so roughly twice this power level is needed for operations in sunlight

  1. Operating experience with BWR nuclear power

    International Nuclear Information System (INIS)

    Bonsdorf, Magnus von.

    1986-01-01

    The two-unit nuclear power station in Olkiluoto on the western coast of Finland produces about 20 per cent of the electricity consumption of the country. The first unit, TVO-I was first connected to the national grid in September 1978 and TVO-II in February 1980. The original rated power output of each unit was 660 MWe, corresponding to the thermal power of 2000 MW from the reactor. Technical modifications allowed the power to be uprated by 8%. The operating statistics (load factors etc.) are given and the outage experience discussed. The radiological history shows very low radioactivity and dose levels have been maintained at the plant. (UK)

  2. Operating experience with nuclear power stations in Member States in 2008. 2009 edition

    International Nuclear Information System (INIS)

    2009-08-01

    This edition is the fortieth in the IAEA's series of annual reports on operating experience with nuclear power plants in Member States. It is a direct output from the IAEA's Power Reactor Information System (PRIS) and contains information on electricity production and overall performance of individual plants during 2008. In addition to annual information, the report contains a historical summary of performance during the lifetime of individual plants and figures illustrating worldwide performance of the nuclear industry. The CD-ROM provides enhanced features for data search and analysis

  3. Simplified reactive power management strategy for complex power grids under stochastic operation and incomplete information

    International Nuclear Information System (INIS)

    Vlachogiannis, John G.

    2009-01-01

    In the current released energy market, the large-scale complex transmission networks and the distribution ones with dispersed energy sources and 'intelligent' components operate under uncertainties, stochastic and prior incomplete information. A safe and reliable operation of such complex power grids is a major issue for system operators. Under these circumstances an online reactive power management strategy with minimum risk concerning all uncertain and stochastic parameters is proposed. Therefore, new concepts such as reactive power-weighted node-to-node linking and reactive power control capability are introduced. A distributed and interconnected stochastic learning automata system is implemented to manage, in a unified and unique way, the reactive power in complex power grids with stochastic reactive power demand and detect the vulnerable part. The proposed simplified strategy can also consider more stochastic aspects such as variable grid's topology. Results of the proposed strategy obtained on the networks of IEEE 30-bus and IEEE 118-bus systems demonstrate the effectiveness of the proposed strategy.

  4. 14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.

    Science.gov (United States)

    2010-01-01

    ... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...

  5. 14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.

    Science.gov (United States)

    2010-01-01

    ... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...

  6. Reliability research to nuclear power plant operators based on several methods

    International Nuclear Information System (INIS)

    Fang Xiang; Li Fu; Zhao Bingquan

    2009-01-01

    The paper utilizes many kinds of international reliability research methods, and summarizes the review of reliability research of Chinese nuclear power plant operators in past over ten years based on the simulator platform of nuclear power plant. The paper shows the necessity and feasibility of the research to nuclear power plant operators from many angles including human cognition reliability, fuzzy mathematics model and psychological research model, etc. It will be good to the safe operation of nuclear power plant based on many kinds of research methods to the reliability research of nuclear power plant operators. (authors)

  7. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-04-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority of Finland (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the third quarter of 1997, except for the annual maintenance outages of Loviisa plant units which lasted well over a month in all. There was also a brief interruption in electricity generation at Olkiluoto 1 for repairs and at Olkiluoto 2 due to a disturbance at the turbine plant. All plant units were in long-term test operation at upgraded reactor power level approved by STUK. The load factor average of all plant units was 87.6 %. One event in the third quarter was classified level 1 on the International Nuclear Event Scale (INES). It was noted at Loviisa 2 that one of four pressurized water tanks in the plant unit's emergency cooling system had been inoperable for a year. Other events in this quarter were INES level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  8. Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Florita, A.; Hodge, B. M.; Milligan, M.

    2012-08-01

    The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.

  9. The control of operational risk in nuclear power plant operations - Some cross-cultural perspectives

    International Nuclear Information System (INIS)

    Suchard, A.; Rochlin, G.

    1992-01-01

    The operation of nuclear power plants requires the management of a complex technology under exacting performance and safety criteria. Organizations operating nuclear power plants are faced with the challenge of simultaneously meeting technical, organizational, and social demands, striving toward perfection in a situation where learning by trial and error can be too costly. In this process, they interact with regulatory bodies who seek to help minimize operational risk by imposing and upholding safety standards. The character of this interaction differs in various countries, as does the larger cultural setting. The study generally pursued the question of how organizations operating complex and demanding technologies adapt to such requirements and circumstances, and how they can succeed in delivering nearly error-free performance. One aspect of this study includes the comparison of organizational and cultural environments for nuclear power plant operations in the US, France, Germany, Sweden, and Switzerland. The research involved in-depth, continuous observations on location and interviews with plant personnel, especially control operators, at one plant in each country

  10. Operating history of U.S. nuclear power reactors

    International Nuclear Information System (INIS)

    1974-01-01

    The operating history of U. S. nuclear power plants through December 31, 1974 has been collected. Included are those nuclear reactor facilities which produce electricity, even if in token amounts, or which are part of a development program concerned with the generation of electricity through the use of a nuclear reactor as a heat source. The information is based on data furnished by facility operators. The charts are plotted in terms of cumulative thermal energy as a function of time. Since only those shutdowns of five days or more are shown, the charts do not give a detailed history of plant operation. They do, however, give an overview of the operating history of a variety of developmental and experimental nuclear power reactors. The data show the yearly gross generation of electricity for each U. S. nuclear plant and, for civilian power plants, information on reactor availability and plant capacity factor. (U.S.)

  11. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  12. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  13. Social power, product conspicuousness, and the demand for luxury brand counterfeit products.

    Science.gov (United States)

    Bian, Xuemei; Haque, Sadia; Smith, Andrew

    2015-03-01

    The aim of this article is twofold: (1) to achieve a better understanding of the psychological determinants of the demand for luxury brand counterfeit products (LBCP) through exploring the effects of social power; (2) to extend power literature by identifying boundary conditions of the relationship between social power and compensatory consumption identified by Rucker and Galinsky (2008, J. Consum. Res., 35, 257-267) and Rucker and Galinsky (2009, J. Exp. Soc. Psychol., 45, 549-555). Findings from three experiments demonstrate that social power holds key insights into understanding consumers' purchase propensity for LBCP; product conspicuousness moderates the effects of social power on purchase propensity for status products; these moderation effects are only observed when the status products are LBCP but not genuine products. This article, therefore, contributes to the literature regarding the demand for counterfeits as well as the social power and compensatory consumption literature. © 2014 The British Psychological Society.

  14. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  15. Operations quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1987-01-01

    This standard covers the quality assurance of all activities concerned with the operation and maintenance of plant equipment and systems in CANDU-based nuclear power plants during the operations phase, the period between the completion of commissioning and the start of decommissioning

  16. Minimal RED Cell Pairs Markedly Improve Electrode Kinetics and Power Production in Microbial Reverse Electrodialysis Cells

    KAUST Repository

    Cusick, Roland D.

    2013-12-17

    Power production from microbial reverse electrodialysis cell (MRC) electrodes is substantially improved compared to microbial fuel cells (MFCs) by using ammonium bicarbonate (AmB) solutions in multiple RED cell pair stacks and the cathode chamber. Reducing the number of RED membranes pairs while maintaining enhanced electrode performance could help to reduce capital costs. We show here that using only a single RED cell pair (CP), created by operating the cathode in concentrated AmB, dramatically increased power production normalized to cathode area from both acetate (Acetate: from 0.9 to 3.1 W/m 2-cat) and wastewater (WW: 0.3 to 1.7 W/m2), by reducing solution and charge transfer resistances at the cathode. A second RED cell pair increased RED stack potential and reduced anode charge transfer resistance, further increasing power production (Acetate: 4.2 W/m2; WW: 1.9 W/m2). By maintaining near optimal electrode power production with fewer membranes, power densities normalized to total membrane area for the 1-CP (Acetate: 3.1 W/m2-mem; WW: 1.7 W/m2) and 2-CP (Acetate: 1.3 W/m2-mem; WW: 0.6 W/m2) reactors were much higher than previous MRCs (0.3-0.5 W/m2-mem with acetate). While operating at peak power, the rate of wastewater COD removal, normalized to reactor volume, was 30-50 times higher in 1-CP and 2-CP MRCs than that in a single chamber MFC. These findings show that even a single cell pair AmB RED stack can significantly enhance electrical power production and wastewater treatment. © 2013 American Chemical Society.

  17. Minimal RED Cell Pairs Markedly Improve Electrode Kinetics and Power Production in Microbial Reverse Electrodialysis Cells

    KAUST Repository

    Cusick, Roland D.; Hatzell, Marta; Zhang, Fang; Logan, Bruce E.

    2013-01-01

    Power production from microbial reverse electrodialysis cell (MRC) electrodes is substantially improved compared to microbial fuel cells (MFCs) by using ammonium bicarbonate (AmB) solutions in multiple RED cell pair stacks and the cathode chamber. Reducing the number of RED membranes pairs while maintaining enhanced electrode performance could help to reduce capital costs. We show here that using only a single RED cell pair (CP), created by operating the cathode in concentrated AmB, dramatically increased power production normalized to cathode area from both acetate (Acetate: from 0.9 to 3.1 W/m 2-cat) and wastewater (WW: 0.3 to 1.7 W/m2), by reducing solution and charge transfer resistances at the cathode. A second RED cell pair increased RED stack potential and reduced anode charge transfer resistance, further increasing power production (Acetate: 4.2 W/m2; WW: 1.9 W/m2). By maintaining near optimal electrode power production with fewer membranes, power densities normalized to total membrane area for the 1-CP (Acetate: 3.1 W/m2-mem; WW: 1.7 W/m2) and 2-CP (Acetate: 1.3 W/m2-mem; WW: 0.6 W/m2) reactors were much higher than previous MRCs (0.3-0.5 W/m2-mem with acetate). While operating at peak power, the rate of wastewater COD removal, normalized to reactor volume, was 30-50 times higher in 1-CP and 2-CP MRCs than that in a single chamber MFC. These findings show that even a single cell pair AmB RED stack can significantly enhance electrical power production and wastewater treatment. © 2013 American Chemical Society.

  18. Research on wind power grid-connected operation and dispatching strategies of Liaoning power grid

    Science.gov (United States)

    Han, Qiu; Qu, Zhi; Zhou, Zhi; He, Xiaoyang; Li, Tie; Jin, Xiaoming; Li, Jinze; Ling, Zhaowei

    2018-02-01

    As a kind of clean energy, wind power has gained rapid development in recent years. Liaoning Province has abundant wind resources and the total installed capacity of wind power is in the forefront. With the large-scale wind power grid-connected operation, the contradiction between wind power utilization and peak load regulation of power grid has been more prominent. To this point, starting with the power structure and power grid installation situation of Liaoning power grid, the distribution and the space-time output characteristics of wind farm, the prediction accuracy, the curtailment and the off-grid situation of wind power are analyzed. Based on the deep analysis of the seasonal characteristics of power network load, the composition and distribution of main load are presented. Aiming at the problem between the acceptance of wind power and power grid adjustment, the scheduling strategies are given, including unit maintenance scheduling, spinning reserve, energy storage equipment settings by the analysis of the operation characteristics and the response time of thermal power units and hydroelectric units, which can meet the demand of wind power acceptance and provide a solution to improve the level of power grid dispatching.

  19. IAEA activity on operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Dounaev, V.; Fujita, Y.; Juslin, K.; Haugset, K.; Lux, I.; Naser, J.

    1994-01-01

    Various operator support systems for nuclear power plants are already operational or under development in the IAEA Member States. Operator support systems are based on intelligent data processing and, in addition to plant operation, they are also becoming more important for safety. A key feature of operator support systems is their availability to restructure data to increase its relevance for a given situation. This can improve the user's ability to identify plant mode, system state, and component state and to identify and diagnose faults. Operator support systems can also assist the user in planning and implementing corrective actions to improve the nuclear power plant's availability and safety. In September 1991, the IAEA Committee for Contractual Scientific Services approved the Co-ordinated Research Programme (CRP) on ''Operator Support Systems in Nuclear Power Plants'' in the framework of the Project ''Man-Machine Interface Studies''. The main objective of this programme is to provide guidance and technology transfer for the development and implementation of operator support systems. This includes the experience with human-machine interfaces and closely related issues such as instrumentation and control, the use of computers in nuclear power plants, and operator qualification. (author)

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-12-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations related to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing plant modifications and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and their load factors are also given. At the Loviisa 1 plant unit one of two specially-backed AC busbars was lost during the second quarter of 1993. A ca. 30 minute voltage break caused malfunctions in the plant unit's electrical equipment and rendered inoperable certain components important to safety. The event is rated on the International Nuclear Event Scale (INES) at level 1. In inspections carried out at TVO II during the annual maintenance outage, the number of cracks detected in control rod structural material was higher than usual. When cracks occur, part of boron carbide, the power regulating medium in control rods, may wash into the reactor water and control rod shutdown capability may be impaired. The event is rated on the INES at level 1. Other events in the second quarter of 1993 had no bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  1. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  2. Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik; Gao, Wenzhong

    2015-10-27

    The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

  3. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  4. Aiding operator performance at low power feedwater control

    International Nuclear Information System (INIS)

    Woods, D.D.

    1986-01-01

    Control of the feedwater system during low power operations (approximately 2% to 30% power) is a difficult task where poor performance (excessive trips) has a high cost to utilities. This paper describes several efforts in the human factors aspects of this task that are underway to improve feedwater control. A variety of knowledge acquisition techniques have been used to understand the details of what makes feedwater control at low power difficult and what knowledge and skill distinguishes expert operators at this task from less experienced ones. The results indicate that there are multiple factors that contribute to task difficulty

  5. Operational flexibility and economics of power plants in future low-carbon power systems

    NARCIS (Netherlands)

    Brouwer, Anne Sjoerd; van den Broek, Machteld; Seebregts, Ad; Faaij, André

    2015-01-01

    Future power systems will require large shares of low-carbon generators such as renewables and power plants with Carbon Capture and Storage (CCS) to keep global warming below 2. °C. Intermittent renewables increase the system-wide demand for flexibility and affect the operation of thermal power

  6. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  7. Studies on the power output of a MADEAE-30 operating on complex terrain. Annual Energy Production estimation and Multivariable analysis. A case of multi-stall effect

    International Nuclear Information System (INIS)

    Cuerva, A.

    1996-01-01

    The main need of the EWTS-II Sub-project IV group is to have a suitable data-base which allows it to reach proper conclusions on the characteristics of power performance of wind turbines in complex terrain. With this aim, this document presents an analysis on the power output of the MADE AE-30 Wind turbine operating at Tarifa (also data from flat terrain are enclosed as a reference). An application of the bin method and AEP estimation for energy production method. In the two last issues a directional analysis and an study for two different turbulence intensity ranges are enclosed. Finally the STEPWISE multirregression method is applied on the measurements to identify the stored parameters that have influence on the power output. A brief description of multi stall effect is enclosed. (Author) 7 refs

  8. Nuclear power plant operation 2016. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2017-05-15

    A report is given on the operating results achieved in 2016, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in a further issue.

  9. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  10. Probabilistic Linguistic Power Aggregation Operators for Multi-Criteria Group Decision Making

    Directory of Open Access Journals (Sweden)

    Agbodah Kobina

    2017-12-01

    Full Text Available As an effective aggregation tool, power average (PA allows the input arguments being aggregated to support and reinforce each other, which provides more versatility in the information aggregation process. Under the probabilistic linguistic term environment, we deeply investigate the new power aggregation (PA operators for fusing the probabilistic linguistic term sets (PLTSs. In this paper, we firstly develop the probabilistic linguistic power average (PLPA, the weighted probabilistic linguistic power average (WPLPA operators, the probabilistic linguistic power geometric (PLPG and the weighted probabilistic linguistic power geometric (WPLPG operators. At the same time, we carefully analyze the properties of these new aggregation operators. With the aid of the WPLPA and WPLPG operators, we further design the approaches for the application of multi-criteria group decision-making (MCGDM with PLTSs. Finally, we use an illustrated example to expound our proposed methods and verify their performances.

  11. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  12. Comparison of electricity production costs of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Peltzer, M.

    1980-01-01

    Electricity production costs of nuclear and coal-fired power plants their structure and future development are calculated and compared. Assumed beginning of operation is in the mid-1980. The technical and economical data are based on a nuclear power unit of 1 300 MW and on a coal-fired twin plant of 2 x 750 MW. The study describes and discusses the calculational method and the results. The costs for the electricity generation show an economic advantage for nuclear power. A sensitivity analysis shows that these results are valid also for changed input parameters. (orig.) [de

  13. Power System Operation with Large-Scale Wind Power in Liberalised Environments

    International Nuclear Information System (INIS)

    Ummels, B.C.

    2009-01-01

    The disadvantages of producing electricity from fossil fuels are that their supply is finite and unevenly distributed across the earth. Conventional power stations also emit greenhouse gases. Therefore, sustainable alternatives must be developed, such as wind power. The disadvantages of wind are that it may or may not blow and that it is unpredictable. Th generation of electricity must however always equal the consumption. This makes the integration of wind power in the electricity system more difficult. This thesis investigates the integration of wind power into the existing power system. Simulation models are developed and used to explore the operation of power systems with a lot of wind power. The simulations provide a picture of the reliability, cost and emission of CO2 of the generation of electricity, with and without wind power. The research also takes into account electricity exchange on international markets. Possible solutions for integrating wind power, such as flexible power plants and energy storage, are investigated as well

  14. Improving nuclear power plant safety through operator aids

    International Nuclear Information System (INIS)

    1987-12-01

    In October 1986, the IAEA convened a one-week Technical Committee Meeting on Improving Nuclear Power Plant Safety Through Operator Aids. The term ''operator aid'' or more formally ''operator support system'' refers to a class of devices designed to be added to a nuclear power plant control station to assist an operator in performing his job and thereby decrease the probability of operator error. The addition of a carefully planned and designed operator aid should result in an increase in nuclear power plant safety and reliability. Operator aids encompass a wide range of devices from the very simple, such as color coding a display to distinguish it out of a group of similar displays, to the very complex, such as a computer-generated video display which concentrates a number of scattered indicator readings located around a control room into a concise display in front of the operator. This report provides guidelines and information to help make a decision as to whether an operator aid is needed, what kinds of operator aids are available and whether it should be purchased or developed by the utility. In addition, a discussion is presented on advanced operator aids to provide information on what may become available in the future. The broad scope of these guidelines makes it most suitable for use by a multi-disciplinary team. The document consists of two parts. The recommendations and results of the meeting discussions are given in the first part. The second part is the annex where the papers presented at the Technical Committee Meeting are printed. A separate abstract was prepared for each of the 10 papers. Refs, figs and tabs

  15. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-02-01

    During the third quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. The annual maintenance outages of the Loviisa plant units were held during the report period. All events during this quarter are classified as Level hero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were below authorised limits. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  16. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-09-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost all the time in the first quarter of 1992. The load factor average was 99.8%. All events which are classified on the International Nuclear Event Scale were level 0/below scale on the Scale. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure, originating from the nuclear power plants, were detected in samples collected in the vicinity of the nuclear power plants

  17. Training and qualification of nuclear power plant operators (4)

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2009-01-01

    Training center using the simulators, instructor training, training upgrade, deployment of digital control panel and review of training were described with overseas practice. Recently, nuclear power plant on-site simulators were also used for respective operator training. Operator teamwork training, training team performance upgrade, reflection of operating experiences in nuclear power plant accidents, development of training support equipments and management of training records were needed to review and upgrade training and qualification programs. (T. Tanaka)

  18. Decentralized power generation from biogas; Production d'energie decentralisee a partir de biogaz

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    Areva Bioenergies proposes ready-to-use biogas production and valorization units that use industrial effluents (liquid effluents, spent water, solid wastes). Biogas valorization is performed through cogeneration plants with an output power of 500 kW to 10 MW. This brochure presents Areva's global offer in methanation projects (support, engineering, optimization). Areva Bioenergies counts 20 dual-purpose power plants in operation or under construction in the world which represent an installed power of 220 MW.

  19. The distribution of wind power forecast errors from operational systems

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, Bri-Mathias; Ela, Erik; Milligan, Michael

    2011-07-01

    Wind power forecasting is one important tool in the integration of large amounts of renewable generation into the electricity system. Wind power forecasts from operational systems are not perfect, and thus, an understanding of the forecast error distributions can be important in system operations. In this work, we examine the errors from operational wind power forecasting systems, both for a single wind plant and for an entire interconnection. The resulting error distributions are compared with the normal distribution and the distribution obtained from the persistence forecasting model at multiple timescales. A model distribution is fit to the operational system forecast errors and the potential impact on system operations highlighted through the generation of forecast confidence intervals. (orig.)

  20. The economics of long-term operation of nuclear power plants

    International Nuclear Information System (INIS)

    Lokhov, Alexey; Huerta, Alejandro; Dufresne, Luc; Giraud, Anne; Osouf, Nicolas

    2012-01-01

    Refurbishment and long-term operation (LTO) of existing nuclear power plants (NPPs) today are crucial to the competitiveness of the nuclear industry in OECD countries as existing nuclear power plants produce base-load power at a reliable cost. A number of nuclear power plants, most notably 73 units in the United States (up to 2012), have been granted lifetime extensions of up to 60 years, a development that is being keenly watched in other OECD countries. In many of these (e.g. France, Switzerland), there is no legal end to the operating licence, but continued operation is based on the outcomes of periodic safety reviews. This study analyses technical and economic data on the upgrade and lifetime extension experience in OECD countries. A multi-criteria assessment methodology is used considering various factors and parameters reflecting current and future financial conditions of operation, political and regulatory risks, the state of the plants' equipment and the general role of nuclear power in the country's energy policy. The report shows that long-term operation of nuclear power plants has significant economic advantages for most utilities envisaging LTO programmes. In most cases, the continued operation of NPPs for at least ten more years is profitable even taking into account the additional costs of post-Fukushima modifications, and remains cost-effective compared to alternative replacement sources

  1. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  2. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  3. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  4. Radiation protection during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    This Guide describes a Radiation Protection Programme for nuclear power plants. It includes: (1) An outline of the basic principles as well as practical aspects of the programme; (2) A description of the responsibilities of the operating organization to establish an effective programme based upon these principles; (3) A description of the administrative and technical measures to establish and implement the programme. This Guide also deals with the operational aspects to be considered by the operating organization in reviewing design in order to facilitate implementation of the Radiation Protection Programme. This Guide covers the requirements for a Radiation Protection Programme for all operational states of the nuclear power plant. It also includes guidelines for handling planned special exposures and for coping with unplanned exposures and contamination of personnel, areas, and equipment. Additional information concerning emergency situations involving releases of radioactive materials is given in Safety Guides 50-SG-O6, ''Preparedness of the Operating Organization (Licensee) for Emergencies at Nuclear Power Plants'', and 50-SG-G6, ''Preparedness of Public Authorities for Emergencies at Nuclear Power Plants''. This Guide covers the principles of dose limitation to site personnel and to the public, but it does not include detailed instructions on the techniques used for the actual measurement and evaluation of the exposures. This Guide does not include detailed instructions on environmental surveys, but it does mention principal steps in environmental monitoring which may be required for confirmation of the acceptability of radioactive discharges

  5. How do strategic decisions and operative practices affect operating room productivity?

    Science.gov (United States)

    Peltokorpi, Antti

    2011-12-01

    Surgical operating rooms are cost-intensive parts of health service production. Managing operating units efficiently is essential when hospitals and healthcare systems aim to maximize health outcomes with limited resources. Previous research about operating room management has focused on studying the effect of management practices and decisions on efficiency by utilizing mainly modeling approach or before-after analysis in single hospital case. The purpose of this research is to analyze the synergic effect of strategic decisions and operative management practices on operating room productivity and to use a multiple case study method enabling statistical hypothesis testing with empirical data. 11 hypotheses that propose connections between the use of strategic and operative practices and productivity were tested in a multi-hospital study that included 26 units. The results indicate that operative practices, such as personnel management, case scheduling and performance measurement, affect productivity more remarkably than do strategic decisions that relate to, e.g., units' size, scope or academic status. Units with different strategic positions should apply different operative practices: Focused hospital units benefit most from sophisticated case scheduling and parallel processing whereas central and ambulatory units should apply flexible working hours, incentives and multi-skilled personnel. Operating units should be more active in applying management practices which are adequate for their strategic orientation.

  6. Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B; Decision and Information Sciences; Western Area Power Administration

    2010-07-31

    On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

  7. Mitigating an increase of specific power consumption in a cryogenic air separation unit at reduced oxygen production

    Science.gov (United States)

    Singla, Rohit; Chowdhury, Kanchan

    2017-02-01

    Specific power consumed in a Linde double column air separation unit (ASU) increases as the quantity of oxygen produced at a given purity is decreased due to the changes of system requirement or market demand. As the plant operates in part load condition, the specific power consumption (SPC) increases as the total power consumption remains the same. In order to mitigate the increase of SPC at lower oxygen production, the operating pressure of high pressure column (HPC) can be lowered by extending the low pressure column (LPC) by a few trays and adding a second reboiler. As the duty of second reboiler in LPC is increased, the recovery of oxygen decreases with a lowering of the HPC pressure. This results in mitigation of the increase of SPC of the plant. A Medium pressure ASU with dual reboiler that produces pressurised gaseous and liquid products of oxygen and nitrogen is simulated in Aspen Hysys 8.6®, a commercial process simulator to determine SPC at varying oxygen production. The effects of reduced pressure of air feed into the cold box on the size of heat exchangers (HX) are analysed. Operation strategy to obtain various oxygen production rates at varying demand is also proposed.

  8. Safe operation of power plants. Pt. 1

    International Nuclear Information System (INIS)

    Freymeyer, P.

    1977-01-01

    Electrotechniques were given a dominating role in the construction of nuclear power plants. The operation of power plants - particularly nuclear power plants - is impossible without the use of electrotechnical and control means. Despite of all reserve in the development and despite of the conservative attitude it is necessary to use the newest results of development and to incite the development ot new electronic systems for the solution of these tasks. (orig.) [de

  9. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    The safety of a nuclear power plant is ensured by means of proper site selection, design, construction and commissioning, and the evaluation of these, followed by proper management, operation and maintenance of the plant. In a later phase, a proper transition to decommissioning is required. The organization and management of plant operations ensures that a high level of safety is achieved through the effective management and control of operational activities. This publication is a revision of the Safety Requirements publication Safety of Nuclear Power Plants: Operation, which was issued in 2000 as IAEA Safety Standards Series No. NS-R-2. The purpose of this revision was to restructure Safety Standards Series No. NS-R-2 in the light of new operating experience and new trends in the nuclear industry; to introduce new requirements that were not included in Safety Standards Series No. NS-R-2 on the operation of nuclear power plants; and to reflect current practices, new concepts and technical developments. This update also reflects feedback on the use of the standards, both from Member States and from the IAEA's safety related activities. The publication is presented in the new format for Safety Requirements publications. The present publication reflects the safety principles of the Fundamental Safety Principles. It has been harmonized with IAEA Safety Standards Series No. GS-R-3 on The Management System for Facilities and Activities. Guidance on the fulfilment of the safety requirements is provided in supporting Safety Guides. The terminology used in this publication is defined and explained in the IAEA Safety Glossary. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the safety objective and safety principles that are established in the Fundamental Safety Principles. This

  10. Vehicle-to-Grid for islanded power system operation in Bornholm

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2010-01-01

    Vehicle-to-Grid (V2G) systems are an emerging concept of utilizing the battery storage of electric vehicles (EVs) for providing power system regulation services. This technology could be used to balance the variable electricity generated from various renewable energy sources. This article considers...... a model of an aggregated electric vehicle based battery storage to support an isolated power system operating with a large wind power penetration in the Danish island of Bornholm. From the simulation results, the EV battery storages represented by the V2G systems are able to integrate more fluctuating...... wind power. The islanded Bornholm power system operates satisfactory for the case of replacing most of the conventional generator reserves with V2G systems, which may represent a future operation scenario....

  11. Operational limits and conditions for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It covers the concept of operational limits and conditions, their content as applicable to various types of thermal reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The principles of the operational limits and conditions are established in section 3 of the Agency's Code of Practice on Safety in Nuclear Power Plant Operation, including Commissioning and Decommissioning (IAEA Safety Series No. 50-C-O), which this present Safety Guide supplements. In order to present all pertinent information in this Guide, the provisions of section 3 of the Code are repeated

  12. The reactor plasma physics of tandem mirror startup and fractional power operation

    International Nuclear Information System (INIS)

    Kantrowitz, F.D.; Firestone, M.A.; Guebel, D.M.; Mau, T.K.

    1984-01-01

    Plasma behavior and the performance of plasma technologies are studied during the startup and fractional power operation of tandem mirrors. Five phases of machine operation are identified, some of which require plasma. The plasma phases include plasma initiation and heating, a standby phase with plasma at the density and temperature characteristics of full design performance in reactors, a deuterium-tritium fractional power operating phase in which the fusion plasma undergoes staged power increases to full power, and rated power operating phase. Plasma initiation and heating uses electron cyclotron resonance heating preionization of background gas in the plug and ion cyclotron resonance heating in the central cell. Operation of the radio-frequency systems, the neutral beams, and the direct converter are studied to determine constraints affecting plasma operation. Studies of fractional power operation, carried out using a quasi-steady-state analysis, show that the plasma Q value can be made remarkably insensitive to the level of fusion power by controlling the plasma radius. Copper insert coils used to increase the maximum choke field require considerable power and cause the recirculating power fraction to increase sharply as the fusion power is reduced. Moreover, when an efficient drift pumping scheme is used, achieved improvements in plasma Q by using high-field choke coils must be weighed against their power consumption and other technological difficulties

  13. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  14. The function of people in a nuclear power plant in operation

    International Nuclear Information System (INIS)

    Pickel, E.

    1986-01-01

    Based mainly on the operating experience of Obrigheim nuclear power plant - a two-loop pressurized water reactor with about 120,000 operating hours - the function of people in the very complex technical field of operation including supervision, maintenance and repair of a nuclear power plant is presented with special attention to safety related activities. The boundaries are indicated where automatic actions for safety and economic reasons are necessary and where manually operated systems are possible or even desirable. Typical examples and figures will show, how the operating people influenced the operation and availability of Obrigheim nuclear power plant. (orig./GL)

  15. The optimization of nuclear power plants operation modes in emergency situations

    Science.gov (United States)

    Zagrebayev, A. M.; Trifonenkov, A. V.; Ramazanov, R. N.

    2018-01-01

    An emergency situations resulting in the necessity for temporary reactor trip may occur at the nuclear power plant while normal operating mode. The paper deals with some of the operation c aspects of nuclear power plant operation in emergency situations and during threatened period. The xenon poisoning causes limitations on the variety of statements of the problem of calculating characteristics of a set of optimal reactor power off controls. The article show a possibility and feasibility of new sets of optimization tasks for the operation of nuclear power plants under conditions of xenon poisoning in emergency circumstances.

  16. Production costs: U.S. gas turbine ampersand combined-cycle power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This fourth edition of UDI's gas turbine O ampersand M cost report gives 1991 operation and maintenance expenses for over 450 US gas turbine power plants. Modeled on UDI's popular series of O ampersand M cost reports for US steam-electric plants, this report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, total fuel expenses, total non-fuel O ampersand M expenses, total production costs, and current plant capitalization. Coverage includes over 90 percent of the utility-owned gas/combustion turbine and combined-cycle plants installed in the country

  17. Operating experience feedback on lose of offsite power supply for nuclear power plant

    International Nuclear Information System (INIS)

    Jiao Feng; Hou Qinmai; Che Shuwei

    2013-01-01

    The function of the service power system of a nuclear power plant is to provide safe and reliable power supply for the nuclear power plant facilities. The safety of nuclear power plant power supply is essential for nuclear safety. The serious accident of Fukushima Daiichi nuclear power plant occurred due to loss of service power and the ultimate heat sink. The service power system has two independent offsite power supplies as working power and auxiliary power. This article collected events of loss of offsite power supply in operating nuclear power plants at home and abroad, and analyzed the plant status and cause of loss of offsite power supply events, and proposed improvement measures for dealing with loss of offsite power supply. (authors)

  18. Hydrogen Production System with High Temperature Electrolysis for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kentaro, Matsunaga; Eiji, Hoashi; Seiji, Fujiwara; Masato, Yoshino; Taka, Ogawa; Shigeo, Kasai

    2006-01-01

    Steam electrolysis with solid oxide cells is one of the most promising methods for hydrogen production, which has the potential to be high efficiency. Its most parts consist of environmentally sound and common materials. Recent development of ceramics with high ionic conductivity suggests the possibility of widening the range of operating temperature with maintaining the high efficiency. Toshiba is constructing a hydrogen production system with solid oxide electrolysis cells for nuclear power plants. Tubular-type cells using YSZ (Yttria-Stabilized- Zirconia) as electrolyte showed good performance of steam electrolysis at 800 to 900 deg C. Larger electrolysis cells with present configuration are to be combined with High Temperature Reactors. The hydrogen production efficiency on the present designed system is expected around 50% at 800 to 900 deg C of operating temperature. For the Fast Reactors, 'advanced cell' with higher efficiency at lower temperature are to be introduced. (authors)

  19. Application of gamma-field measurement to computer-assisted management of pressurized water nuclear power plant operation

    International Nuclear Information System (INIS)

    Hampel, R.; Schwedusch, F.

    1990-01-01

    The high requirements on NPP operation to be nuclear safe and optimal with regard to electricity production need high redundancy and diversity in the instrumentation being implemented. As a contribution of the Zittau Technical University to development of alternative measuring techniques for primary coolant circuit monitoring, application of gamma-field measurement for determination of reactor power and power distribution is described. Theoretical foundation and conclusions herefrom derived are explained. (author)

  20. 14 CFR 101.25 - Operating limitations for Class 2-High Power Rockets and Class 3-Advanced High Power Rockets.

    Science.gov (United States)

    2010-01-01

    ... Power Rockets and Class 3-Advanced High Power Rockets. 101.25 Section 101.25 Aeronautics and Space... OPERATING RULES MOORED BALLOONS, KITES, AMATEUR ROCKETS AND UNMANNED FREE BALLOONS Amateur Rockets § 101.25 Operating limitations for Class 2-High Power Rockets and Class 3-Advanced High Power Rockets. When operating...

  1. Developing maximal neuromuscular power: Part 1--biological basis of maximal power production.

    Science.gov (United States)

    Cormie, Prue; McGuigan, Michael R; Newton, Robert U

    2011-01-01

    This series of reviews focuses on the most important neuromuscular function in many sport performances, the ability to generate maximal muscular power. Part 1 focuses on the factors that affect maximal power production, while part 2, which will follow in a forthcoming edition of Sports Medicine, explores the practical application of these findings by reviewing the scientific literature relevant to the development of training programmes that most effectively enhance maximal power production. The ability of the neuromuscular system to generate maximal power is affected by a range of interrelated factors. Maximal muscular power is defined and limited by the force-velocity relationship and affected by the length-tension relationship. The ability to generate maximal power is influenced by the type of muscle action involved and, in particular, the time available to develop force, storage and utilization of elastic energy, interactions of contractile and elastic elements, potentiation of contractile and elastic filaments as well as stretch reflexes. Furthermore, maximal power production is influenced by morphological factors including fibre type contribution to whole muscle area, muscle architectural features and tendon properties as well as neural factors including motor unit recruitment, firing frequency, synchronization and inter-muscular coordination. In addition, acute changes in the muscle environment (i.e. alterations resulting from fatigue, changes in hormone milieu and muscle temperature) impact the ability to generate maximal power. Resistance training has been shown to impact each of these neuromuscular factors in quite specific ways. Therefore, an understanding of the biological basis of maximal power production is essential for developing training programmes that effectively enhance maximal power production in the human.

  2. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis, outlines the main reasons for the reliable performance of Swiss nuclear power plants and explains the management function as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability. (orig./RW)

  3. The advantages and disadvantages of centralized control of air power at operational level

    Science.gov (United States)

    Arisoy, Uǧur

    2014-05-01

    People do not want to see and hear a war. In today's world, if war is inevitable, the use of air power is seen as the preferable means of conducting operations instead of financially burdensome land battles which are more likely to cause heavy loss of life. The use of Air Power has gained importance in NATO operations in the Post-Cold War era. For example, air power has undertaken a decisive role from the beginning to the end of the operation in Libya. From this point of view, the most important issue to consider is how to direct air power more effectively at operational level. NATO's Core JFAC (Joint Force Air Command) was established in 2012 to control joint air power at operational level from a single center. US had experienced JFAC aproach in the Operation Desert Storm in 1991. UK, France, Germany, Italy and Spain are also directing their air power from their JFAC structures. Joint air power can be directed from a single center at operational level by means of JFAC. JFAC aproach provides complex planning progress of Air Power to be controled faster in a single center. An Air Power with a large number of aircrafts, long range missiles of cutting-edge technology may have difficulties in achieving results unless directed effectively. In this article, directing air power more effectively at operational level has been studied in the framework of directing air power from a single center carried out by SWOT analysis technique. "Directing Air Power at operational level from a single center similar to JFAC-like structure" is compared with "Directing Air Power at operational level from two centers similar to AC (Air Command) + CAOC (Combined Air Operations Center) structure" As a result of this study, it is assessed that directing air power at operational level from a single center would bring effectiveness to the air campaign. The study examines directing air power at operational level. Developments at political, strategic and tactical levels have been ignored.

  4. Knowledge base for power plant operation and its application to operation guide

    International Nuclear Information System (INIS)

    Doi, Atsushi; Sakaguchi, Toshiaki

    1986-01-01

    The present study is aimed at constructing a knowledge base for supervisory control operation in power plants and developing an operation guidance by using it. Examination is made to provide dignosis procedures on the basis of an existing alarm system. An operation guidance procedure for diagnosis is proposed which is to be followed when several alarms are sounded simultaneously in a power plant, and application of the procedure to an existing plant is examined. The operation manual for the plant includes 75 description items for six alarms. It is shown that the number of items related to these alarms can be reduced by 70 % by rearranging them according to the procedure. Another investigation is conducted to provide an operation manual for diagnosis to be used when one alarm is sounded in a plant. The quality of the manual developed is on nearly the same level with that for the existing plant examined. When a knowledge base is to be constructed from an existing operation manual, the processing operation generally requires a certain level of linguistic comprehension ability, such as for judgment of synonyms. It is demonstrated that the procedure proposed here is able to develop a high-quality knowledge base with standardized terminology. The procedure can also serve to construct operation manuals for plants in other industrial fields. (Nogami, K.)

  5. Safety goals for nuclear power plant operation

    International Nuclear Information System (INIS)

    1983-05-01

    This report presents and discusses the Nuclear Regulatory Commission's, Policy Statement on Safety Goals for the Operation of Nuclear Power Plants. The safety goals have been formulated in terms of qualitative goals and quantitative design objectives. The qualitative goals state that the risk to any individual member of the public from nuclear power plant operation should not be a significant contributor to that individual's risk of accidental death or injury and that the societal risks should be comparable to or less than those of viable competing technologies. The quantitative design objectives state that the average risks to individual and the societal risks of nuclear power plant operation should not exceed 0.1% of certain other risks to which members of the US population are exposed. A subsidiary quantitative design objective is established for the frequency of large-scale core melt. The significance of the goals and objectives, their bases and rationale, and the plan to evaluate the goals are provided. In addition, public comments on the 1982 proposed policy statement and responses to a series of questions that accompanied the 1982 statement are summarized

  6. An independent system operator's perspective on operational ramp forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Porter, G. [New Brunswick System Operator, Fredericton, NB (Canada)

    2010-07-01

    One of the principal roles of the power system operator is to select the most economical resources to reliably supply electric system power needs. Operational wind power production forecasts are required by system operators in order to understand the impact of ramp event forecasting on dispatch functions. A centralized dispatch approach can contribute to a more efficient use of resources that traditional economic dispatch methods. Wind ramping events can have a significant impact on system reliability. Power systems can have constrained or robust transmission systems, and may also be islanded or have large connections to neighbouring systems. Power resources can include both flexible and inflexible generation resources. Wind integration tools must be used by system operators to improve communications and connections with wind power plants. Improved wind forecasting techniques are also needed. Sensitivity to forecast errors is dependent on current system conditions. System operators require basic production forecasts, probabilistic forecasts, and event forecasts. Forecasting errors were presented as well as charts outlining the implications of various forecasts. tabs., figs.

  7. Low Power Operation of Temperature-Modulated Metal Oxide Semiconductor Gas Sensors.

    Science.gov (United States)

    Burgués, Javier; Marco, Santiago

    2018-01-25

    Mobile applications based on gas sensing present new opportunities for low-cost air quality monitoring, safety, and healthcare. Metal oxide semiconductor (MOX) gas sensors represent the most prominent technology for integration into portable devices, such as smartphones and wearables. Traditionally, MOX sensors have been continuously powered to increase the stability of the sensing layer. However, continuous power is not feasible in many battery-operated applications due to power consumption limitations or the intended intermittent device operation. This work benchmarks two low-power, duty-cycling, and on-demand modes against the continuous power one. The duty-cycling mode periodically turns the sensors on and off and represents a trade-off between power consumption and stability. On-demand operation achieves the lowest power consumption by powering the sensors only while taking a measurement. Twelve thermally modulated SB-500-12 (FIS Inc. Jacksonville, FL, USA) sensors were exposed to low concentrations of carbon monoxide (0-9 ppm) with environmental conditions, such as ambient humidity (15-75% relative humidity) and temperature (21-27 °C), varying within the indicated ranges. Partial Least Squares (PLS) models were built using calibration data, and the prediction error in external validation samples was evaluated during the two weeks following calibration. We found that on-demand operation produced a deformation of the sensor conductance patterns, which led to an increase in the prediction error by almost a factor of 5 as compared to continuous operation (2.2 versus 0.45 ppm). Applying a 10% duty-cycling operation of 10-min periods reduced this prediction error to a factor of 2 (0.9 versus 0.45 ppm). The proposed duty-cycling powering scheme saved up to 90% energy as compared to the continuous operating mode. This low-power mode may be advantageous for applications that do not require continuous and periodic measurements, and which can tolerate slightly higher

  8. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  9. Helium turbomachinery operating experience from gas turbine power plants and test facilities

    International Nuclear Information System (INIS)

    McDonald, Colin F.

    2012-01-01

    The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts. - Highlights:

  10. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  11. Ignition and time-dependent fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Vold, E.L.; Mau, T.K.; Conn, R.W.

    1986-01-01

    The eventual utilization of a tokamak fusion reactor for commercial power necessitates a thorough understanding of the operational requirements at full and fractional power levels and during transitions from one operating level to another. In this study we examine the role of burn control in maintaining the reactor plasma at equilibrium to avoid thermal runaway during fractional power operation. Because these requirements rely so heavily on the assumptions that govern the plasma transport, this study focuses on time-dependent analyses and a comparison of ignition requirements using a range of energy confinement

  12. Operation management of thermal power plant. Karyoku plant no unten kanri

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-15

    Nowadays, thermal power plants are getting bigger and bigger in capacity. At the same time, high reliability to the frequent start and stop due to the demand change as well as effective economy. This paper describes the total operation management system. It included the start and stop, normal operation, specified operation, water quality, operation management involving the environmental problems, protection of machinery and equipment in case of emergency, measures against the failure, and the measures against the disaster. The outline of the normal operation is as follows: from the cost economical point of view, the kind of fuel is changed according to the load; i.e., coal for basic operation, LNG for basic to medium operation, and oil for medium to peak operation. The change in demand cannot be followed by the hydroelectric power. The adjustment of the power depending on the load change can be achieved by the thermal power generation. The automatic frequency control, economical load distribution control are also done. In the nighttime, the minimum load operation is required. The voltage change operation below the rated value or the phase-advancing operation is also done depending on the load conditions. 21 figs., 6 tabs.

  13. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    DEFF Research Database (Denmark)

    Lythcke-Jørgensen, Christoffer Ernst; Haglind, Fredrik; Clausen, Lasse Røngaard

    2014-01-01

    production. An exergy analysis is carried out for a modelled polygeneration system in which lignocellulosic ethanol production based on hydrothermal pretreatment is integrated in an existing combined heat and power (CHP) plant. The ethanol facility is driven by steam extracted from the CHP unit when feasible...... district heating production in the ethanol facility. The results suggest that the efficiency of integrating lignocellulosic ethanol production in CHP plants is highly dependent on operation, and it is therefore suggested that the expected operation pattern of such polygeneration system is taken......Lignocellulosic ethanol production is often assumed integrated in polygeneration systems because of its energy intensive nature. The objective of this study is to investigate potential irreversibilities from such integration, and what impact it has on the efficiency of the integrated ethanol...

  14. ALARA for nuclear power plant operation

    International Nuclear Information System (INIS)

    Knapp, P.J.

    1979-01-01

    The concept of maintaining radiation exposures as low as reasonably achievable (ALARA) is outlined in connection with nuclear power plant operations. The basis of the concept is reviewed and a specific example of ALARA action is presented. (author)

  15. Designing nuclear power plants for improved operation and maintenance

    International Nuclear Information System (INIS)

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig

  16. Designing nuclear power plants for improved operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig.

  17. Institute of nuclear power operations perspectives on PSA applications

    International Nuclear Information System (INIS)

    Webster, W.E.; Miller, W.J. Jr.

    1996-01-01

    The investment to develop a PSA is very substantial, and therefore, there is motivation to recover this investment through further use of the techniques used to develop it. It is not surprising that nuclear power plant staff are beginning to use PSA to make operational decisions. The Institute of Nuclear Power Operations is interested in those factors that impact the conduct of plant operations and therefore is actively monitoring the increased usage of PSA techniques. The purpose of this paper is to provide some thoughts and perspectives on the use of PSA as a factor in operational decision making, including decision making in activities performed by engineering, maintenance and operation personnel. (author)

  18. Demand side resource operation on the Irish power system with high wind power penetration

    DEFF Research Database (Denmark)

    Keane, A.; Tuohy, A.; Meibom, Peter

    2011-01-01

    part of the power system plant mix and contribute to the flexible operation of a power system. A model for demand side resources is proposed here that captures its key characteristics for commitment and dispatch calculations. The model is tested on the all island Irish power system, and the operation...... of the functions of conventional peaking plant. Demand side resources are also shown to be capable of improving the reliability of the system, with reserve capability identified as a key requirement in this respect....... of the model is simulated over one year in both a stochastic and deterministic mode, to illustrate the impact of wind and load uncertainty. The results illustrate that demand side resources can contribute to the efficient, flexible operation of systems with high penetrations of wind by replacing some...

  19. Studies on the power output of a MADE AE-30 operating on complex terrain. Annual Energy Production estimation and Multivariable analysis. A case of multi-stall effect

    Energy Technology Data Exchange (ETDEWEB)

    Cuerva, A.

    1996-12-01

    The main need of the EWTS-II Sub-project IV group is to have a suitable data-base which allows it to reach proper conclusions on the characteristics of power performance of wind turbines in complex terrain. With this aim, this document presents an analysis on the power output of the MADE AE-30 Wind turbine operating at Tarifa (also data from flat terrain are enclosed as a reference). An application of the bin method and AEP estimation for energy production method, in the two last issues a directional analysis and an study for two different turbulence intensity ranges are enclosed. Finally the Stepwise multirregression method is applied on the measurements to identify the stored parameters that have influence on the power output. A brief description of multi stall effect is enclosed. (Author)

  20. Operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The nuclear power plants in the Federal Republic of Germany kept their portion of power supply into the public grid system constant in 1983, compared to 1982. The generation had an absolute increase of 3.6% and amounts now to 65.9 TWh. Particularly mentioned should be the generation of the Grafenrheinfeld Nuclear Power Plant which is holding the 'World Record' with 9.969 TWh. The availability of the plants was generally satisfactory, as far as long-term retrofit measures with long outage periods were not necessary, as it was the case in Brunsbuettel and Wuergassen. The planned retrofit phases have been completed in all power plants. As far as safety is concerned, there was no reason to recommended a change of the present fundamental planning- and operation aspects. (orig.) [de

  1. Extensions of the results on powers of -hyponormal and -hyponormal operators

    Directory of Open Access Journals (Sweden)

    Yang Changsen

    2006-01-01

    Full Text Available Firstly, we will show the following extension of the results on powers of -hyponormal and -hyponormal operators: let and be positive integers, if is -hyponormal for , then: (i in case , and hold, (ii in case , and hold. Secondly, we will show an estimation on powers of -hyponormal operators for which implies the best possibility of our results. Lastly, we will show a parallel estimation on powers of -hyponormal operators as follows: let , then the following hold for each positive integer and : (i there exists a log-hyponormal operator such that , (ii there exists a -hyponormal operator such that .

  2. 14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.

    Science.gov (United States)

    2010-01-01

    ... power-operated systems. 25.672 Section 25.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...

  3. 14 CFR 23.672 - Stability augmentation and automatic and power-operated systems.

    Science.gov (United States)

    2010-01-01

    ... power-operated systems. 23.672 Section 23.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show compliance with the flight characteristics requirements of this part...

  4. A methodology for nuclear power plant operational events evaluation

    International Nuclear Information System (INIS)

    Araujo, Jeferson

    2015-01-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  5. A methodology for nuclear power plant operational events evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Jeferson, E-mail: jeferson@cnen.gov.br [Comissao Nacional de Energia Nuclear (CGRC/CNEN), Rio de janeiro, RJ (Brazil). Coordenacao Geral de Reatores e do Ciclo de Combustivel; Costa, Sergio Dias, E-mail: sergiodiascosta@hotmail.com [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  6. Applications of magnetic power production and its assessment - Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Kitanovski, A.; Vuarnoz, D.; Diebold, M.; Gonin, C.; Egolf, P. W.

    2007-07-01

    This annual report for the Swiss Federal Office of Energy (SFOE) takes a look at the work done at the University of Applied Sciences of Western Switzerland in 2007 on a project involving power production based on magnetic effects. In this annual report, a selection of feasible and economic magnetic power conversion systems is listed. Magnetic 'power generators' based on permanent and superconducting magnets are analysed for several heat source temperatures, magnetic field strengths and machine rotational frequencies. The analysis uses a newly derived model, which permits the determination of thermodynamic efficiency and exergy efficiency of a magnetic power-conversion system. This study shows that magnetic power conversion is better than conventional technologies in many aspects, such as, for example, for low exergy heat sources, where most of the conventional energy conversion technologies cannot even operate. The authors state that, in contrast, magnetic power generation technology leads to a high exergy efficiency of energy conversion for such sources.

  7. Plant operational states analysis in low power and shutdown PSA

    International Nuclear Information System (INIS)

    He Jiandong; Qiu Yongping; Zhang Qinfang; An Hongzhen; Li Maolin

    2013-01-01

    The purpose of Plant Operational States (POS) analysis is to disperse the continuous and dynamic process of low power and shutdown operation, which is the basis of developing event tree models for accident sequence analysis. According to the design of a 300 MW Nuclear Power Plant Project, operating experience and procedures of the reference plant, a detailed POS analysis is carried out based on relative criteria. Then, several kinds of POS are obtained, and the duration of each POS is calculated according to the operation records of the reference plant. The POS analysis is an important element in low power and shutdown PSA. The methodology and contents provide reference for POS analysis. (authors)

  8. Nowcasting wind power for grid operation at RWE Transportnetz from Strom GmbH (RWE TSO)

    International Nuclear Information System (INIS)

    Ernst, B.; Vanzetta, J.

    2008-01-01

    This paper presented new methods of balancing power supply and demand for electricity systems that have a large share of wind power. Wind power forecasting plays a key role in integrating a large share of wind power into an electricity system, as it links the weather dependent production with the scheduled production of conventional power plants and the forecast of the electricity demand. Wind power forecasts are essential for grid operation. Since most European electricity markets focus on the day ahead market, wind balancing is also done the day ahead. A current trend is that the intra day markets are increasing in popularity and becoming more liquid. Therefore, nowcasting will play a vital role in improving wind power related economics because shorter timeframes are much easier and better to predict. Nowcasting uses actual measurements of weather and also considers power data. Many wind power prediction tools for day ahead forecasts are available. Most models have 3 common steps, notably numerical weather prediction, wind-to-power model and regional up-scaling. A comparison between recent measurements with the output of numerical weather models showed that nowcasting provides a forecast that outperforms a pure numerical weather forecast. The first results were very promising. All 3 nowcasting solutions were found to have their own unique advantages and limitations. Ongoing research will continue to improve wind power prediction. 2 refs., 3 figs

  9. Operation of SST-1 TF power supply during SST-1 campaigns

    International Nuclear Information System (INIS)

    Sharma, Dinesh Kumar; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-01-01

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  10. Operation of SST-1 TF power supply during SST-1 campaigns

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Dinesh Kumar, E-mail: dinesh@ipr.res.in; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-10-15

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  11. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-03-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole third quarter of 1991. Longer interruptions in electricity generation were caused by the annual maintenances of the Loviisa plant units. The load factor average was 81.7 %. In a test conducted during the annual maintenance outage of Loviisa 1 it was detected that the check valve of the discharge line of one pressurized emergency make-up tank did not open sufficiently at the tank's hydrostatic pressure. In connection with a 1988 modification, a too tightly dimensioned bearing had been mounted on the valve's axle rod and the valve had not been duly tested after the operation. The event is classified as Level 1 on the International Nuclear Event Scale. Other events in this quarter which are classified according to the International Nuclear Event Scale are Level Zero (Below Scale). Occupational radiation doses and releases of radioactive material off-site were below authorised limits in this quarter. Only small amounts of radioactive materials originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  12. Operational experiences with condensate purifiers at the Paks Nuclear Power Plant, Hungary

    International Nuclear Information System (INIS)

    Doma, Arpad; Patek, Gabor

    1990-01-01

    Increasingly stricter criteria are applied to the secondary cooling circuits of nuclear power stations, due to technology development of feedwater supply systems. Demands for the minimization of ionic impurities caused by leaks and by the corrosion and erosion products from the unstable metal-water thermodynamic system are growing continuously. Therefore, a full-flow condensate purification system has been installed at the PNPP to meet increased water requirements, and its operation is described. (R.P.) 19 figs

  13. Method of inhibiting concentration of radioactive corrosion products in cooling water or nuclear power plants

    International Nuclear Information System (INIS)

    Takabayashi, Jun-ichi; Hishida, Mamoru; Ishikura, Takeshi.

    1979-01-01

    Purpose: To suppress the increase in the concentration of the radioactive corrosion products in cooling water, which increase is accompanied by the transference of the corrosion products activated and accumulated in the core due to dissolution and exfoliation into the core water, and inhibit the flowing of said products out of the core and the diffusion thereof into the cooling system, thereby to prevent the accumulation of said products in the cooling system and prevent radioactive contaminations. Method: In a nuclear power plant of a BWR type light water reactor, when the temperature of the pile water is t 0 C, hydrogen is injected in cooling water in a period of time from immediately before starting of the drive stopping operation of the nuclear power plant to immediately after the termination of restarting operation, whereby the concentration of hydrogen in the reactor water through said period is maintained at a value more than 2exp (0.013 t) cm 3 N.T.P./kg H 2 O. (Aizawa, K.)

  14. Development of a computerized operator support system for BWR power plant

    International Nuclear Information System (INIS)

    Monta, K.; Sekimizu, K.; Sato, N.; Araki, T.; Mori, N.

    1985-01-01

    A computerized operator support system for BWR power plant has been developed since 1980 supported by the Japanese government. The main functions of the systems are post trip operational guidance, disturbance analysis, standby system management, operational margin monitoring and control rod operational guidance. The former two functions aim at protection against incidents during operation of nuclear power plants and the latter three functions aim at their prevention. As the final stage of the development, these functions are combined with the plant supervision function and are organized as an advanced man-machine interface for BWR power plant. During the above process, operator task analyses are performed to enable synthesis of these support functions for right fit to operator tasks and to realize a hierarchical structure for CRT displays for right fit to operators cognitive needs. (author)

  15. Design and Control of Integrated Systems for Hydrogen Production and Power Generation

    Science.gov (United States)

    Georgis, Dimitrios

    Growing concerns on CO2 emissions have led to the development of highly efficient power plants. Options for increased energy efficiencies include alternative energy conversion pathways, energy integration and process intensification. Solid oxide fuel cells (SOFC) constitute a promising alternative for power generation since they convert the chemical energy electrochemically directly to electricity. Their high operating temperature shows potential for energy integration with energy intensive units (e.g. steam reforming reactors). Although energy integration is an essential tool for increased efficiencies, it leads to highly complex process schemes with rich dynamic behavior, which are challenging to control. Furthermore, the use of process intensification for increased energy efficiency imposes an additional control challenge. This dissertation identifies and proposes solutions on design, operational and control challenges of integrated systems for hydrogen production and power generation. Initially, a study on energy integrated SOFC systems is presented. Design alternatives are identified, control strategies are proposed for each alternative and their validity is evaluated under different operational scenarios. The operational range of the proposed control strategies is also analyzed. Next, thermal management of water gas shift membrane reactors, which are a typical application of process intensification, is considered. Design and operational objectives are identified and a control strategy is proposed employing advanced control algorithms. The performance of the proposed control strategy is evaluated and compared with classical control strategies. Finally SOFC systems for combined heat and power applications are considered. Multiple recycle loops are placed to increase design flexibility. Different operational objectives are identified and a nonlinear optimization problem is formulated. Optimal designs are obtained and their features are discussed and compared

  16. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  17. Power Production Analysis of the OE Buoy WEC for the CORES Project

    DEFF Research Database (Denmark)

    Lavelle, John; Kofoed, Jens Peter

    This report describes the analysis performed on the OE Buoy for the CORES project by the wave energy group at Aalborg University, Denmark. OE Buoy is a type of Oscillating Water Column (OWC) wave energy converter as part of the CORES project. This type of device is one of the most developed...... to extract energy from the ocean (1). Typically, a Wells turbine is used for the Power Take Off (PTO) for OWCs. The Wells turbine has the advantage that it is self-rectifying – with the ability to operate with either direction of airflow, which changes during each cycle of the wave. This type of turbine...... which a total of 39 hours of power production data was collected. A data acquisition system was used to sample the sensors on board and the generator shaft power time-series data was used in the analysis here. A wave-rider buoy, located at the site of OE Buoy and operated by the Marine Institute Ireland...

  18. Determination Of Maximum Power Of The RSG-Gas At Power Operation Mode Using One Line Cooling System

    International Nuclear Information System (INIS)

    Hastuti, Endiah Puji; Kuntoro, Iman; Darwis Isnaini, M.

    2000-01-01

    In the frame of minimizing the operation-cost, operation mode using one line cooling system is being evaluated. Maximum reactor power shall be determined to assure that the existing safety criteria are not violated. The analysis was done by means of a core thermal hydraulic code, COOLOD-N. The code solves core thermal hydraulic equation at steady state conditions. By varying the reactor power as the input, thermal hydraulic parameters such as fuel cladding and fuel meat temperatures as well as safety margin against flow instability were calculated. Imposing the safety criteria to the results, maximum permissible power for this operation was obtained as much as 17.1 MW. Nevertheless, for operation the maximum power is limited to 15MW

  19. Method for Prediction of the Power Output from Photovoltaic Power Plant under Actual Operating Conditions

    Science.gov (United States)

    Obukhov, S. G.; Plotnikov, I. A.; Surzhikova, O. A.; Savkin, K. D.

    2017-04-01

    Solar photovoltaic technology is one of the most rapidly growing renewable sources of electricity that has practical application in various fields of human activity due to its high availability, huge potential and environmental compatibility. The original simulation model of the photovoltaic power plant has been developed to simulate and investigate the plant operating modes under actual operating conditions. The proposed model considers the impact of the external climatic factors on the solar panel energy characteristics that improves accuracy in the power output prediction. The data obtained through the photovoltaic power plant operation simulation enable a well-reasoned choice of the required capacity for storage devices and determination of the rational algorithms to control the energy complex.

  20. Generalizations of the results on powers of -hyponormal operators

    Directory of Open Access Journals (Sweden)

    Ito Masatoshi

    2001-01-01

    Full Text Available Recently, as a nice application of Furuta inequality, Aluthge and Wang (J. Inequal. Appl., 3 (1999, 279–284 showed that "if is a -hyponormal operator for , then is -hyponormal for any positive integer ," and Furuta and Yanagida (Scientiae Mathematicae, to appear proved the more precise result on powers of -hyponormal operators for . In this paper, more generally, by using Furuta inequality repeatedly, we shall show that "if is a -hyponormal operator for , then is -hyponormal for any positive integer " and a generalization of the results by Furuta and Yanagida in (Scientiae Mathematicae, to appear on powers of -hyponormal operators for .

  1. Initiating nuclear power programmes: Responsibilities and capabilities of owners and operators

    International Nuclear Information System (INIS)

    2009-01-01

    There is an increasing interest in developing nuclear power due to growing energy needs, limitations on natural resources and concern for the environment. However, the introduction and development of nuclear power is a major undertaking. This requires building the necessary national infrastructure to construct and operate nuclear power plants in a safe, secure and technically sound manner. Many IAEA Member States that do not yet have nuclear power programmes have expressed their interest to the IAEA about the possibility of introducing nuclear power plants to help meet their energy needs. To assist these Member States, the IAEA is preparing a series of guides and reports. An overall description of the issues was presented by the IAEA in a brochure entitled Considerations to Launch a Nuclear Power Programme (GOV/INF/2007/2), which was targeted mainly at policy makers. A subsequent IAEA Nuclear Energy Series publication, Milestones in the Development of a National Infrastructure for Nuclear Power (NG-G-3.1), describes 19 infrastructure issues that should be addressed through the three phases of development outlined in the brochure, Considerations to Launch a Nuclear Power Programme. The IAEA is preparing a number of guides addressing these issues. Once a firm decision has been made by a government to proceed with the development of a nuclear programme, a number of organizations must be developed. A key organization for the successful construction and operation of the first nuclear power plant is the owner/operator, who provides ownership and management of the project. The owner/operator must clearly understand what must be done and how it has to act, who are partners and supporters and the corresponding interactions that have to be established. The owner or operator may be state owned or a private company. It may be an existing utility, or a specially established project organization. Its responsibilities include bidding, construction, licensing, commissioning

  2. Operation of Finnish nuclear power plants. Quarterly report, 3. quarter 1988

    International Nuclear Information System (INIS)

    Koponen, H.

    1989-02-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  3. The importance of flexible power plant operation for Jiangsu's wind integration

    DEFF Research Database (Denmark)

    Hong, Lixuan; Lund, Henrik; Möller, Bernd

    2012-01-01

    This paper presents the influence of different regulation strategies on wind energy integration into the existing energy system of Jiangsu. The ability of wind integration is defined in terms of the ability to avoid excess electricity production, to conserve primary energy consumption and to redu...... regulations of Jiangsu’s energy system are compared and analyzed in the range of a wind input from 0% to 42% of the total electricity demand. It is concluded that operating power plants in a flexible way facilitates the promotion of more intermittent wind integration....

  4. Operation of Finnish nuclear power plants. Quarterly report, 2. quarter 1988

    International Nuclear Information System (INIS)

    Koponen, H.

    1988-12-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environement

  5. Operation of Finnish nuclear power plants. Quarterly report 3. quarter 1987

    International Nuclear Information System (INIS)

    Haenninen, R.

    1988-06-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel o the environment

  6. Economic Analysis of a Nuclear Reactor Powered High-Temperature Electrolysis Hydrogen Production Plant

    International Nuclear Information System (INIS)

    E. A. Harvego; M. G. McKellar; M. S. Sohal; J. E. O'Brien; J. S. Herring

    2008-01-01

    A reference design for a commercial-scale high-temperature electrolysis (HTE) plant for hydrogen production was developed to provide a basis for comparing the HTE concept with other hydrogen production concepts. The reference plant design is driven by a high-temperature helium-cooled nuclear reactor coupled to a direct Brayton power cycle. The reference design reactor power is 600 MWt, with a primary system pressure of 7.0 MPa, and reactor inlet and outlet fluid temperatures of 540 C and 900 C, respectively. The electrolysis unit used to produce hydrogen includes 4,009,177 cells with a per-cell active area of 225 cm2. The optimized design for the reference hydrogen production plant operates at a system pressure of 5.0 MPa, and utilizes an air-sweep system to remove the excess oxygen that is evolved on the anode (oxygen) side of the electrolyzer. The inlet air for the air-sweep system is compressed to the system operating pressure of 5.0 MPa in a four-stage compressor with intercooling. The alternating-current, AC, to direct-current, DC, conversion efficiency is 96%. The overall system thermal-to-hydrogen production efficiency (based on the lower heating value of the produced hydrogen) is 47.12% at a hydrogen production rate of 2.356 kg/s. An economic analysis of this plant was performed using the standardized H2A Analysis Methodology developed by the Department of Energy (DOE) Hydrogen Program, and using realistic financial and cost estimating assumptions. The results of the economic analysis demonstrated that the HTE hydrogen production plant driven by a high-temperature helium-cooled nuclear power plant can deliver hydrogen at a competitive cost. A cost of $3.23/kg of hydrogen was calculated assuming an internal rate of return of 10%

  7. Monitoring Disaster-Related Power Outages Using NASA Black Marble Nighttime Light Product

    Science.gov (United States)

    Wang, Z.; Román, M. O.; Sun, Q.; Molthan, A. L.; Schultz, L. A.; Kalb, V. L.

    2018-04-01

    Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL) provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA) Black Marble NTL daily standard product suite (VNP46) is generated from Visible Infrared Imaging Radiometer Suite (VIIRS) Day/Night Band (DNB) onboard the NASA/National Oceanic and Atmospheric Administration (NOAA) Suomi National Polar-orbiting Partnership (Suomi- NPP) satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines), the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  8. Improving the performances of gas turbines operated on natural gas in combined cycle power plants with application of mathematical models

    International Nuclear Information System (INIS)

    Dimkovski, Sasho

    2014-01-01

    The greater energy demand by today society sets a number of new challenges in the energy sector. The climate extremes impose new modes of operation of the power plants, with high flexibility in production. Combined cycle co generative power plants are the latest trend in the energy sector. Their high prevalence is due to the great efficiency and the good environmental characteristics. The main work horse in these cogeneration plants is the gas turbine, which power production and efficiency strongly depends on the external climate conditions. In warmer periods when there is increased demand for electricity, the power production from the gas turbines significantly declines. Because of the high electricity demand from the grid and reduced power production from the gas turbines at the same time, the need for application of appropriate technology for preserving the performances and power of the gas turbines arises. This master thesis explores different methods to improve the power in gas turbines by cooling the air on the compressor inlet, analyzing their applicability and effectiveness in order to choose the optimal method for power augmentation for the climatic conditions in the city Skopje. The master thesis gives detailed analysis of the weather in Skopje and the time frame in which the chosen method is applicable. At the end in the master thesis, the economic feasibility of the given method for power augmentation is clearly calculated, using a model of a power plant and calculating the resulting amount of gained energy, the amount of the initial investment, the cost for maintenance and operation of the equipment. By these calculations the period for initial return of investment is obtained. As an added benefit the positive environmental impacts of the applied technology for inlet air cooling is analyzed. (author)

  9. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Slack, J.; Norton, J.L.; Malkoske, G.R.

    2003-01-01

    therapy machines. Today the majority of the cancer therapy cobalt-60 sources used in the world are manufactured using material from the NRU reactor in Chalk River. The same technology that was used for producing cobalt-60 in a research reactor was then adapted and transferred for use in a CANDU power reactor. In the early 1970s, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production was initiated in the four Pickering A CANDU reactors located east of Toronto. This was the first full scale production of millions of curies of cobalt-60 per year. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology in additional CANDUs. Over the years MDS Nordion has partnered with CANDU reactor owners to produce cobalt-60 at various sites. CANDU reactors that have, or are still producing cobalt-60, include Pickering A, Pickering B, Gentilly 2, Embalse in Argentina, and Bruce B. In conclusion, the technology for cobalt-60 production in CANDU reactors, designed and developed by MDS Nordion and Atomic Energy of Canada, has been safely, economically and successfully employed in CANDU reactors with over 195 reactor years of production. Today over forty percent of the world's disposable medical supplies are made safer through sterilization using cobalt-60 sources from MDS Nordion. Over the past 40 years, MDS Nordion with its CANDU reactor owner partners, has safely and reliably shipped more than 500 million curies of cobalt-60 sources to customers around the world. MDS Nordion is presently adding three more CANDU power reactors to its supply chain. These three additional cobalt producing CANDU's will help supplement the ability of the health care industry to provide safe, sterile, medical disposable products to people around the world. As new applications for cobalt-60 are identified, and the demand for bulk cobalt-60 increases, MDS Nordion and AECL

  10. Recent Operating Experience involving Power Electronics Failure in Korea Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jaedo

    2015-01-01

    Recently, modern power electronics devices for electrical component were steadily increased in electrical systems which used for main power control and protection. To upgrade the system reliability we recommended the redundancy for electrical equipment trip system. The past several years, Korean Nuclear power plants have changed the electrical control and protection systems (Auto Voltage Regulator, Power Protection Relay) for main generator and main power protection relay systems. In this paper we deal with operating experience involving modern solid state power electronics failure in Korean nuclear power plants. One of the failures we will discuss the degraded phenomenon of power electronics device for CEDMCS(Control Element Drive Mechanism Control System). As the result of the failure we concerned about the modification for trip source of main generator excitation systems and others. We present an interesting issue for modern solid state devices (IGBT, Thyristors). (authors)

  11. Dairy operation management practices and herd milk production.

    Science.gov (United States)

    Losinger, W C; Heinrichs, A J

    1996-03-01

    A national US survey collected data on herd milk production and management of Holstein herds. Step-wise selection identified management practices that were related to herd milk production using only operations that calculated herd milk production as well as using data from all operations. Results were similar. Milk production was highest in the West. Operations with 25% registered cattle had higher production than operations with no registered cattle. Dairy operations that reported a mean BW > 545 kg at first calving had higher mean milk production than operations with a mean BW or = 27 mo at first calving. In addition, use of the following management practices was associated with higher rolling herd average milk production: calves born in individual areas in buildings, calves hand-fed first colostrum, starter grain fed to preweaned calves, ionophores fed to heifers from birth to first calving, DHIA record-keeping system used, computerized records, and no new cattle introduced in the previous 12 mo.

  12. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  13. Power Product Equipment Technician: Outboard-Engine Boat Systems. Teacher Edition [and] Student Edition.

    Science.gov (United States)

    Hilley, Robert

    This curriculum guide contains teacher and student materials for a course on outboard-engine boat systems for power product equipment technician occupations. The course contains the following three units of instruction: (1) Orientation to Outboard-Engine Boat Systems and Rigging; (2) Trailers and Safe Towing and Boat Operation; and (3) Seasonal…

  14. A Real-Time Simulation Platform for Power System Operation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Østergaard, Jacob; Wu, Qiuwei

    2010-01-01

    This paper describes the real-time digital simulation platform that can be used for power system operation, analysis, and power system modeling. This particular platform gives grid operators, planners and researchers the opportunity to observe how a power system behaves and can be used...... in real time. Various phenomena commonly encountered when dealing with the two-area system is studied. Despite its small size, it mimics very closely the behavior of typical systems in actual operation. The electromagnetic transient type of simulation made in RSCAD enables the study of fast and detailed...... phenomena like single-phase faults in the two-area network and to observe their effects on a larger time scale. Also, the case study of 11 bus system with 5 generators has been also used and the results are presented....

  15. Low Power Operation of Temperature-Modulated Metal Oxide Semiconductor Gas Sensors

    Directory of Open Access Journals (Sweden)

    Javier Burgués

    2018-01-01

    Full Text Available Mobile applications based on gas sensing present new opportunities for low-cost air quality monitoring, safety, and healthcare. Metal oxide semiconductor (MOX gas sensors represent the most prominent technology for integration into portable devices, such as smartphones and wearables. Traditionally, MOX sensors have been continuously powered to increase the stability of the sensing layer. However, continuous power is not feasible in many battery-operated applications due to power consumption limitations or the intended intermittent device operation. This work benchmarks two low-power, duty-cycling, and on-demand modes against the continuous power one. The duty-cycling mode periodically turns the sensors on and off and represents a trade-off between power consumption and stability. On-demand operation achieves the lowest power consumption by powering the sensors only while taking a measurement. Twelve thermally modulated SB-500-12 (FIS Inc. Jacksonville, FL, USA sensors were exposed to low concentrations of carbon monoxide (0–9 ppm with environmental conditions, such as ambient humidity (15–75% relative humidity and temperature (21–27 °C, varying within the indicated ranges. Partial Least Squares (PLS models were built using calibration data, and the prediction error in external validation samples was evaluated during the two weeks following calibration. We found that on-demand operation produced a deformation of the sensor conductance patterns, which led to an increase in the prediction error by almost a factor of 5 as compared to continuous operation (2.2 versus 0.45 ppm. Applying a 10% duty-cycling operation of 10-min periods reduced this prediction error to a factor of 2 (0.9 versus 0.45 ppm. The proposed duty-cycling powering scheme saved up to 90% energy as compared to the continuous operating mode. This low-power mode may be advantageous for applications that do not require continuous and periodic measurements, and which can tolerate

  16. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  17. Power-to-Gas coupling to biomethane production. A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Saric, M.; Dijkstra, J.W.; Walspurger, S. [ECN Biomass and Energy Efficiency, Petten (Netherlands)

    2013-09-15

    This preliminary feasibility study on coupling 'Power-to-gas' conversion chain to the bio-methane from producer gas shows a promising potential for efficient and cost effective operation. The production capacity of the biomethane plant can be doubled, while cold gas efficiency remains the same as compared to a standalone biomethane plant. The specifications of the natural gas grid can be reached at the condition that the allowed H2 content is not too strict. The study showed that such coupling implies that both methanation and SNG upgrade sections need to be designed to withstand variable operation conditions and part-load. The methanation section would have to deal with a turndown factor of 2 when switching from E-demand to E-excess operating mode while the CO2 removal section must work efficiently in part-load and respond well in shutdown/start-up operations.

  18. Training device for nuclear power plant operators

    International Nuclear Information System (INIS)

    Schoessow, G. J.

    1985-01-01

    A simulated nuclear energy power plant system with visible internal working components comprising a reactor adapted to contain a liquid with heating elements submerged in the liquid and capable of heating the liquid to an elevated temperature, a steam generator containing water and a heat exchanger means to receive the liquid at an elevated temperature, transform the water to steam, and return the spent liquid to the reactor; a steam turbine receiving high energy steam to drive the turbine and discharging low energy steam to a condenser where the low energy steam is condensed to water which is returned to the steam generator; an electric generator driven by the turbine; indicating means to identify the physical status of the reactor and its contents; and manual and automatic controls to selectively establish normal or abnormal operating conditions in the reactor, steam generator, pressurizer, turbine, electric generator, condenser, and pumps; and to be selectively adjusted to bring the reactor to acceptable operating condition after being placed in an abnormal operation. This device is particularly useful as an education device in demonstrating nuclear reactor operations and in training operating personnel for nuclear reactor systems and also as a device for conducting research on various safety systems to improve the safety of nuclear power plants

  19. Smart Shipboard Power System Operation and Management

    DEFF Research Database (Denmark)

    Kanellos, Fotis D.; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2016-01-01

    as all-electric ships (AESs), the need for more cost-effective and emission-aware solutions is augmented. Such onboard systems are prone to sudden load variations due to the changing weather conditions as well as mission profile, thus they require effective power management systems (PMSs) to operate...... optimally under different working conditions. In this paper, coordinated optimal power management at the supply/demand side of a given AES is studied with regard to different objectives and related technical/environmental constraints. The optimal power management problem is formulated as a mixed...

  20. Optimum operating conditions for a combined power and cooling thermodynamic cycle

    International Nuclear Information System (INIS)

    Sadrameli, S.M.; Goswami, D.Y.

    2007-01-01

    The combined production of thermal power and cooling with an ammonia-water based cycle proposed by Goswami is under intensive investigation. In the cycle under consideration, simultaneous cooling output is produced by expanding an ammonia-rich vapor in an expander to sub-ambient temperatures and subsequently heating the cool exhaust. When this mechanism for cooling production is considered in detail, it is apparent that the cooling comes at some expense to work production. To optimize this trade-off, a very specific coefficient-of-performance has been defined. In this paper, the simulation of the cycle was carried out in the process simulator ASPEN Plus. The optimum operating conditions have been found by using the Equation Oriented mode of the simulator and some of the results have been compared with the experimental data obtained from the cycle. The agreement between the two sets proves the accuracy of the optimization results

  1. HEPS4Power - Extended-range Hydrometeorological Ensemble Predictions for Improved Hydropower Operations and Revenues

    Science.gov (United States)

    Bogner, Konrad; Monhart, Samuel; Liniger, Mark; Spririg, Christoph; Jordan, Fred; Zappa, Massimiliano

    2015-04-01

    In recent years large progresses have been achieved in the operational prediction of floods and hydrological drought with up to ten days lead time. Both the public and the private sectors are currently using probabilistic runoff forecast in order to monitoring water resources and take actions when critical conditions are to be expected. The use of extended-range predictions with lead times exceeding 10 days is not yet established. The hydropower sector in particular might have large benefits from using hydro meteorological forecasts for the next 15 to 60 days in order to optimize the operations and the revenues from their watersheds, dams, captions, turbines and pumps. The new Swiss Competence Centers in Energy Research (SCCER) targets at boosting research related to energy issues in Switzerland. The objective of HEPS4POWER is to demonstrate that operational extended-range hydro meteorological forecasts have the potential to become very valuable tools for fine tuning the production of energy from hydropower systems. The project team covers a specific system-oriented value chain starting from the collection and forecast of meteorological data (MeteoSwiss), leading to the operational application of state-of-the-art hydrological models (WSL) and terminating with the experience in data presentation and power production forecasts for end-users (e-dric.ch). The first task of the HEPS4POWER will be the downscaling and post-processing of ensemble extended-range meteorological forecasts (EPS). The goal is to provide well-tailored forecasts of probabilistic nature that should be reliable in statistical and localized at catchment or even station level. The hydrology related task will consist in feeding the post-processed meteorological forecasts into a HEPS using a multi-model approach by implementing models with different complexity. Also in the case of the hydrological ensemble predictions, post-processing techniques need to be tested in order to improve the quality of the

  2. Professional adaptability of nuclear power plant operators

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2006-01-01

    The paper concerns in the results of analysis for nuclear power plant (NPP) operator job and analysis for human errors related NPP accidents. Based on the principle of ergonomics a full psychological selection system of the professional adaptability of NPP operators including cognitive ability, personality and psychological health was established. The application way and importance of the professional adaptability research are discussed. (authors)

  3. Operation of Finnish nuclear power plants. Quarterly report 3rd quarter, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1995-03-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and of the environment, and tabulated data on the plants` production and load factors are also given. (4 figs., 4 tabs.).

  4. Operation of Finnish nuclear power plants. Quarterly report 3rd quarter, 1994

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1995-03-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and of the environment, and tabulated data on the plants' production and load factors are also given. (4 figs., 4 tabs.)

  5. Assuring human operator alertness at night in power plants

    International Nuclear Information System (INIS)

    Moore-Ede, M.C.

    1988-01-01

    The human body is not designed for peak alertness and performance at night, nor is it well-equipped to cope with the frequent day-night inversions required by rotating shift work schedules. As a result, the human operator can become the weak link in a complex technological operation such as a nuclear power plant. The high degree of dependence on human operator vigilance, decision-making ability and performance that is required in nuclear power plant operations can conflict with the human sleepiness and error-proneness which naturally occur during the night shift or after extended periods without adequate sleep. An opportunity to address these problems has come from a series of major research advances in basic circadian physiology

  6. Operating experience from Swedish nuclear power plants 2004

    International Nuclear Information System (INIS)

    2005-01-01

    2004 was somewhat of a record year for the Swedish nuclear power stations. No serious faults occurred, and production exceeded previous record outputs. Total output from the eleven nuclear power units during the year amounted to 75 TWh, which is the largest amount of power ever produced by nuclear power in Sweden. Corresponding figures for earlier years are 59 TWh (2003), 65 TWh (2002) and 69 TWh (2001). An important reason for this excellent result was the very high energy availability. Forsmark 1, for example, exceeded 97 % availability, while Forsmark 2 just reached 97 %. For all the Swedish nuclear power stations as a whole, availability in 2004 amounted to 91 %. In addition to the connection between production and energy availability, there is also a connection with safety. During the year, safety in the Swedish power stations has been high, not only in absolute terms but also in an international perspective. One measure of safety is to be found in the number of accidents, incidents, anomalies or deviations reported to the IAEA on a scale known as the International Nuclear Event Scale (INES). Sweden has undertaken to report all events in accordance with this international system. Three reports were submitted by the Swedish Nuclear Power Inspectorate, which is responsible for national reporting, during the year. None of them had any significance for reactor safety: all were categorised as incidents or minor deviations from the regulations. Summarising, 2004 has been an excellent year for nuclear power safety, which is also reflected by the record electricity production during the year

  7. Operating experience from Swedish nuclear power plants 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    2004 was somewhat of a record year for the Swedish nuclear power stations. No serious faults occurred, and production exceeded previous record outputs. Total output from the eleven nuclear power units during the year amounted to 75 TWh, which is the largest amount of power ever produced by nuclear power in Sweden. Corresponding figures for earlier years are 59 TWh (2003), 65 TWh (2002) and 69 TWh (2001). An important reason for this excellent result was the very high energy availability. Forsmark 1, for example, exceeded 97 % availability, while Forsmark 2 just reached 97 %. For all the Swedish nuclear power stations as a whole, availability in 2004 amounted to 91 %. In addition to the connection between production and energy availability, there is also a connection with safety. During the year, safety in the Swedish power stations has been high, not only in absolute terms but also in an international perspective. One measure of safety is to be found in the number of accidents, incidents, anomalies or deviations reported to the IAEA on a scale known as the International Nuclear Event Scale (INES). Sweden has undertaken to report all events in accordance with this international system. Three reports were submitted by the Swedish Nuclear Power Inspectorate, which is responsible for national reporting, during the year. None of them had any significance for reactor safety: all were categorised as incidents or minor deviations from the regulations. Summarising, 2004 has been an excellent year for nuclear power safety, which is also reflected by the record electricity production during the year.

  8. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  9. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1997-02-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the third quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of Loviisa plant units and a shutdown at Olkiluoto 1 to identify and repair malfunctions of a high pressure turbine control valve. The load factor average of all plant units was 77.2%. Events in the third quarter of 1996 were classified level 0 on the International Nuclear Event Scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. The names of Teollisuuden Voima Oy's plant units have changed. Olkiluoto 1 and Olkiluoto 2 now replace the names TVO I and TVO II previously used in quarterly reports. (orig.)

  10. A study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants

    International Nuclear Information System (INIS)

    Kim, S. H.; Park, J.

    2008-01-01

    The quality of a probabilistic safety assessment (PSA) has become more important and a human reliability analysis (HRA) is known as a major contributor to the uncertainty of a PSA. As a part of enhancing the HRA quality, a study was initiated to find out characteristics of communication pattern and to evaluate communication quality of the operators of nuclear power plants. Korea Atomic Energy Research Institute (KAERI) is developing evaluation methods for the effect of human-induced events on risk/performance. This paper describes a study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants. The study was carried out in four stages; 1) Video recording 2) Audio scripting 3) Message Classification 4) Communication Pattern Analysis. We recorded eight abnormal simulator training programs from Younggwang nuclear power plant training center. After that we performed message classification and carried out communication pattern analysis. We compared communication patterns of abnormal operating situation with emergency operating situation.As results of analysis, the role of SRO (senior reactor operator) under abnormal operating situation was decreased than the activities under emergency operating situation because each operator (reactor operator, turbine operator, safety supervisor) in main control room (MCR) performs the activity to control by himself with corresponding field engineers with his basic knowledge of the system. On the other hand, the operator's decision making processes and activities under abnormal operating situation were dramatically increased than the emergency operating situation. (authors)

  11. Power electronics basics operating principles, design, formulas, and applications

    CERN Document Server

    Rozanov, Yuriy; Chaplygin, Evgeny; Voronin, Pavel

    2015-01-01

    Power Electronics Basics: Operating Principles, Design, Formulas, and Applications provides fundamental knowledge for the analysis and design of modern power electronic devices. This concise and user-friendly resource:Explains the basic concepts and most important terms of power electronicsDescribes the power assemblies, control, and passive components of semiconductor power switchesCovers the control of power electronic devices, from mathematical modeling to the analysis of the electrical processesAddresses pulse-width modulation, power quality control, and multilevel, modular, and multicell

  12. Electricity production by advanced biomass power systems

    Energy Technology Data Exchange (ETDEWEB)

    Solantausta, Y [VTT Energy, Espoo (Finland). Energy Production Technologies; Bridgwater, T [Aston Univ. Birmingham (United Kingdom); Beckman, D [Zeton Inc., Burlington, Ontario (Canada)

    1996-11-01

    This report gives the results of the Pyrolysis Collaborative Project organized by the International Energy Agency (IEA) under Biomass Agreement. The participating countries or organizations were Canada, European Community (EC), Finland, United States of America, and the United Kingdom. The overall objective of the project was to establish baseline assessments for the performance and economics of power production from biomass. Information concerning the performance of biomass-fuelled power plants based on gasification is rather limited, and even less data is available of on pyrolysis based power applications. In order to gain further insight into the potential for these technologies, this study undertook the following tasks: (1) Prepare process models to evaluate the cost and performance of new advanced biomass power production concepts, (2) Assess the technical and economic uncertainties of different biomass power concepts, (3) Compare the concepts in small scale and in medium scale production (5 - 50 MW{sub e}) to conventional alternatives. Processes considered for this assessment were biomass power production technologies based on gasification and pyrolysis. Direct combustion technologies were employed as a reference for comparison to the processes assessed in this study. Wood was used a feedstock, since the most data was available for wood conversion

  13. Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Park, Jinkyun; Kim, Ji Tae; Kim, Jaewhan; Seong, Poong Hyun

    2016-01-01

    Highlights: • The performance of human operator during LPSD operation is significantly important. • Human performance is affected by drivers such as procedure, training, and etc. • Main drivers during LPSD operation at domestic NPPs were suggested. • It is expected that it will be used for estimating human reliability during LPSD operation. - Abstract: In the past, many researchers believed that a reactor during low power and shutdown operation was sufficiently safe. This belief has been changed by the number of accidents during such types of operation, which is significantly high. Also, it was pointed out that one of the main differences between low power and shutdown operation and full power operation is the significance of human action because there are huge amounts of human actions due to extensive maintenance and testing while automatic control and safety functions may be disabled and procedures are insufficient or incomplete. This paper suggests the main drivers in performing human reliability analysis. For this study, we reviewed eight reports relating to human performance during low power and shutdown operation and applied a root cause analysis method for 53 human or human-related events at domestic nuclear power plants to derive the main drivers that affect the occurrence of those events. As a result, several main drivers were derived, such as procedures, training, experience of personnel, and workload/stress. It is expected that these main drivers will be used to perform human reliability analysis for low power and shutdown operation.

  14. Review of the total system related to operation of nuclear-powered ship

    International Nuclear Information System (INIS)

    Takamasa, Tomoji; Miyashita, Kunio

    2000-01-01

    It is essential to establish a marine reactor having excellent safety and reliability, which is capable of competing economically with conventional ships, and which can be accepted by international society, in order to be prepared for practical application of future nuclear-powered ships. For this purpose, it is important not only to demonstrate a marine reactor using a model or test device to simulate actual operation, but also to establish the environmental requirements for operation of a nuclear-powered ship, such as safety standards that are operationally and internationally common for ships, and to establish a repair base for nuclear-powered ships. Systems research for the practical application of nuclear-powered ships was conducted for five years, fiscal years 1992 through 1996, by a group in the Japan Atomic Energy Research Institute (JAERI), under the project title 'Review of the total system related to operation of nuclear-powered ships.' The project sought to summarize requirements for the practical application of nuclear-powered ships from the standpoint of the need side, e.g., what nuclear-powered ships will be requested, and what functions will be provided under the expected future social environment; to show a complete system concept for the operation of nuclear-powered ships; and to clarify the situations creating demand for nuclear-powered ships, as well as the system and environmental conditions to be established for operation of practical nuclear-powered ships. Study considerations included the size of the operation system for a nuclear-powered ship, a scenario for introducing a nuclear-powered container ship, and economic evolution from the effects on the whole shipping system, based on container ships, of introducing a nuclear-powered ship. The results of these considerations were made the framework for constructing an entire system and evaluating its economy. The treatment and disposal of radioactive waste from a nuclear-powered ship, and the

  15. Computing and cognition in future power plant operations

    International Nuclear Information System (INIS)

    Kisner, R.A.; Sheridan, T.B.

    1983-01-01

    The intent of this paper is to speculate on the nature of future interactions between people and computers in the operation of power plants. In particular, the authors offer a taxonomy for examining the differing functions of operators in interacting with the plant and its computers, and the differing functions of the computers in interacting with the plant and its operators

  16. Computing and cognition in future power-plant operations

    International Nuclear Information System (INIS)

    Kisner, R.A.; Sheridan, T.B.

    1983-01-01

    The intent of this paper is to speculate on the nature of future interactions between people and computers in the operation of power plants. In particular, the authors offer a taxonomy for examining the differing functions of operators in interacting with the plant and its computers, and the differing functions of the computers in interacting with the plant and its operators

  17. Radiation protection of population under normal operation conditions of nuclear power plants

    International Nuclear Information System (INIS)

    Kunz, Eh.; Shvets, I.

    1976-01-01

    Evolution of shielding is defined in short; approaches suggested for applying in radiation protection or being used are evaluated and classified. Modern views analysis of a risk of biological irradiation consequences in public approaches to health protection in connection with the technical progress side by side with provision of separate persons protection requires attentin to the nuclear power plants protection optimization. Protection optimization suggests the analysis of separate components of technology and protection systems, used materials and constructive solutions, maintenance rules and operating load with respect to environmental discharge of radioactive products. It is expedient to carry out similtaneously the similar analysis with respect to the nuclear power plant personnel irradiation, as separate measures can affect both personnel and population irradiation [ru

  18. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-05-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole fourth quarter of 1991. The load factor average was 94.7 % (the whole year 90.9 %). All the events in the last annual quarter, which are classified on the International Nuclear Event Scale, were below scale/level 0. Also the events which occurred in the other quarters of the year 1991 were rated at the scale's lowest levels. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure originating in nuclear power plants were detected in the samples collected in the vicinity of the nuclear power plants

  19. Some problems of evaluating environmental impacts of nuclear power installation building and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The impacts of the construction and operation of a nuclear power installation on the natural environment is discussed, namely on changes in the landscape profile, in the structure of settlement and large-scale agricultural production, the requisition of agricultural land, changes in transport systems, etc., as well as approaches to the evaluation of these environmental impacts with the aim of preserving the optimal state of inter-relations between man and the natural environment. (author)

  20. Risk contribution from low power, shutdown, and other operational modes beyond full power

    Energy Technology Data Exchange (ETDEWEB)

    Whitehead, D.W.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States); Chu, T.L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-04-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 probabilistic risk assessment (PRA) for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. A phased approach was used in Level 1. In Phase 1 the concept of plant operational states (POSs) was developed to provide a better representation of the plant as it transitions from power to nonpower operation. This included a coarse screening analysis of all POSs to identify vulnerable plant configurations, to characterize (on a high, medium, or low basis) potential frequencies of core damage accidents, and to provide a foundation for a detailed Phase 2 analysis. In Phase 2, selected POSs from both Grand Gulf and Surry were chosen for detailed analysis. For Grand Gulf, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected. For Surry, three POSs representing the time the plant spends in midloop operation were chosen for analysis. These included POS 6 and POS 10 of a refueling outage and POS 6 of a drained maintenance outage. Level 1 and Level 2/3 results from both the Surry and Grand Gulf analyses are presented.

  1. Risk contribution from low power, shutdown, and other operational modes beyond full power

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Brown, T.D.; Chu, T.L.; Pratt, W.T.

    1995-01-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 probabilistic risk assessment (PRA) for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. A phased approach was used in Level 1. In Phase 1 the concept of plant operational states (POSs) was developed to provide a better representation of the plant as it transitions from power to nonpower operation. This included a coarse screening analysis of all POSs to identify vulnerable plant configurations, to characterize (on a high, medium, or low basis) potential frequencies of core damage accidents, and to provide a foundation for a detailed Phase 2 analysis. In Phase 2, selected POSs from both Grand Gulf and Surry were chosen for detailed analysis. For Grand Gulf, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected. For Surry, three POSs representing the time the plant spends in midloop operation were chosen for analysis. These included POS 6 and POS 10 of a refueling outage and POS 6 of a drained maintenance outage. Level 1 and Level 2/3 results from both the Surry and Grand Gulf analyses are presented

  2. Ideal Operation of a Photovoltaic Power Plant Equipped with an Energy Storage System on Electricity Market

    Directory of Open Access Journals (Sweden)

    Markku Järvelä

    2017-07-01

    Full Text Available There is no natural inertia in a photovoltaic (PV generator and changes in irradiation can be seen immediately at the output power. Moving cloud shadows are the dominant reason for fast PV power fluctuations taking place typically within a minute between 20 to 100% of the clear sky value roughly 100 times a day, on average. Therefore, operating a utility scale grid connected PV power plant is challenging. Currently, in many regions, renewable energy sources such as solar and wind receive feed-in tariffs that ensure a certain price for the energy. On the other hand, electricity markets operate on a supply-demand principle and a typical imbalance settlement period is one hour. This paper presents the energy, power and corresponding requirements for an energy storage system in a solar PV power plant to feed the power to the grid meeting the electricity spot markets practices. An ideal PV energy production forecast is assumed to be available to define reference powers of the system for the studied imbalance settlement periods. The analysis is done for three different PV system sizes using the existing irradiance measurements of the Tampere University of Technology solar PV power station research plant.

  3. Operational safety performance and economical efficiency evaluation for nuclear power plants

    International Nuclear Information System (INIS)

    Liu Yachun; Zou Shuliang

    2012-01-01

    The economical efficiency of nuclear power includes a series of environmental parameters, for example, cleanliness. Nuclear security is the precondition and guarantee for its economy, and both are the direct embodiment of the social benefits of nuclear power. Through analyzing the supervision and management system on the effective operation of nuclear power plants, which has been put forward by the International Atomic Energy Agency (IAEA), the World Association of Nuclear Operators (WANO), the U.S. Nuclear Regulatory Commission (NRC), and other organizations, a set of indexs on the safety performance and economical efficiency of nuclear power are explored and established; Based on data envelopment analysis, a DEA approach is employed to evaluate the efficiency of the operation performance of several nuclear power plants, Some primary conclusion are achieved on the basis of analyzing the threshold parameter's sensitivity and relativity which affected operational performance. To address the conflicts between certain security and economical indicators, a multi-objective programming model is established, where top priority is given to nuclear safety, and the investment behavior of nuclear power plant is thereby optimized. (authors)

  4. Operation and maintenance of thermal power stations best practices and health monitoring

    CERN Document Server

    Chanda, Pradip

    2016-01-01

    This book illustrates operation and maintenance practices/guidelines for economic generation and managing health of a thermal power generator beyond its regulatory life. The book provides knowledge for professionals managing power station operations, through its unique approach to chemical analysis of water, steam, oil etc. to identify malfunctioning/defects in equipment/systems much before the physical manifestation of the problem. The book also contains a detailed procedure for conducting performance evaluation tests on different equipment, and for analyzing test results for predicting maintenance requirements, which has lent a new dimension to power systems operation and maintenance practices. A number of real life case studies also enrich the book. This book will prove particularly useful to power systems operations professionals in the developing economies, and also to researchers and students involved in studying power systems operations and control. .

  5. User cognition in product operation

    NARCIS (Netherlands)

    Gelderblom, G.J.

    2001-01-01

    Daily a large number of everyday consumer products are being used. Unfortunately part of this usage is not successful. One of the causes of failure lies in the cognitive aspects of product use, users do not know how to operate the product or try to use it in a way which is not successful. Ideally,

  6. MONITORING DISASTER-RELATED POWER OUTAGES USING NASA BLACK MARBLE NIGHTTIME LIGHT PRODUCT

    Directory of Open Access Journals (Sweden)

    Z. Wang

    2018-04-01

    Full Text Available Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA Black Marble NTL daily standard product suite (VNP46 is generated from Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB onboard the NASA/National Oceanic and Atmospheric Administration (NOAA Suomi National Polar-orbiting Partnership (Suomi- NPP satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines, the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  7. Management of nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture covers management aspects which have an immediate bearing on safety and identifies the objectives and tasks of management which are required for safe operation of a nuclear power plant and is based on the Codes of Practice and Safety Guides of the IAEA as well as arrangements in use at the Swiss Nuclear Power Station Beznau. This lecture - discusses the factors to be considered in structuring the operating organization, the support to be provided to plant management, the services and facilities needed and the management system for assuring the safety tasks are performed - describes the responsibilities of plant management and operating organization - outlines the requirements for recruitment, training and retraining as well as qualification and authorization of personnel - describes the programmes for maintenance, testing, examination, inspection, radiological protection, quality assurance, waste management, fuel management, emergency arrangement and security - describes the development of plant operating procedures including procedures to protect the personnel - outlines the requirements for initial and subsequent operation - describes the importance for evaluation and feedback of operating experience - describes the procedures for changes in hardware, procedures and set points - outlines the information flow and the requirements in reference to records and reports. (orig./RW)

  8. Safeguard management for operation security in nuclear power plants (NPPs)

    International Nuclear Information System (INIS)

    Woo, Tae-Ho; Lee, Un-Chul

    2011-01-01

    Safeguard modeling is conducted for the successful operations in the nuclear power plants (NPPs). The characteristics of the secure operation in NPPs are investigated using the network effect method which is quantified by the Monte-Carlo algorithm. Fundamentally, it is impossible to predict the exact time of a terror incident. So, the random sampling for the event frequency is a reasonable method, including the characteristics of network effect method such as the zero-sum quantification. The performance of operation with safeguard is the major concern of this study. There are three kinds of considerations as the neutronics, thermo-hydraulics, and safeguard properties which are organized as an aspect of safeguard considerations. The result, therefore, can give the stability of the operations when the power is decided. The maximum value of secure operation is 12.0 in the third month and the minimum value is 1.0 in the 18th and 54th months, in a 10 years period. Thus, the stability of the secure power operation increases 12 times higher than the lowest value according to this study. This means that the secure operation is changeable in the designed NPPs and the dynamical situation of the secure operation can be shown to the operator.

  9. Implementation of heat production and storage technology and devices in power systems

    International Nuclear Information System (INIS)

    Romanovsky, G.; Mutale, J.

    2012-01-01

    Implementation of heat storage devices and technologies at power generation plants is a promising way to provide more efficient use of natural energy resources. Heat storage devices can partly replace conventional heating technologies (such as direct use of fossil fuels) during peak energy demand or in the situations where heat and electricity supply and demand do not coincide and to obtain low cost heat energy which can be further transmitted to industrial, commercial and domestic consumers. This paper presents the innovative Heat Production and Storage Device and its application at conventional, nuclear and renewable power generation plants for optimization and balancing of electricity grids. The Heat Production and Storage Device is a vessel type induction-immersion heat production and storage device which produces pre-heated water under pressure for heat energy conservation. Operation of this device is based on simultaneous and/or sequential action of an inductor and an immersion heater and can be easily connected to the electricity network as a single or a three phase unit. Heat energy accumulated by the Heat Production and Storage Device can be utilized in different industrial technological processes during periods of high energy prices. - Highlights: ► Heat Production and Storage Device for energy conservation within low load hours. ► Simultaneous and/or sequential operation of the inductor and immersion heater. ► Transform the energy of low frequency electrical current (50 Hz) into heat energy. ► Connection to the electricity network either in single or three phase unit. ► Heat Production and Storage Device will enhance the economic value of the system.

  10. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  11. Tokamak power reactor ignition and time dependent fractional power operation

    International Nuclear Information System (INIS)

    Vold, E.L.; Mau, T.K.; Conn, R.W.

    1986-06-01

    A flexible time-dependent and zero-dimensional plasma burn code with radial profiles was developed and employed to study the fractional power operation and the thermal burn control options for an INTOR-sized tokamak reactor. The code includes alpha thermalization and a time-dependent transport loss which can be represented by any one of several currently popular scaling laws for energy confinement time. Ignition parameters were found to vary widely in density-temperature (n-T) space for the range of scaling laws examined. Critical ignition issues were found to include the extent of confinement time degradation by alpha heating, the ratio of ion to electron transport power loss, and effect of auxiliary heating on confinement. Feedback control of the auxiliary power and ion fuel sources are shown to provide thermal stability near the ignition curve

  12. Operation Characteristics Optimization of Low Power Three-Phase Asynchronous Motors

    Directory of Open Access Journals (Sweden)

    VLAD, I.

    2014-02-01

    Full Text Available Most published papers on low power asynchronous motors were aimed to achieve better operational performances in different operating conditions. The optimal design of the general-purpose motors requires searching and selecting an electric machine to meet minimum operating costs criterion and certain customer imposed restrictive conditions. In this paper, there are many significant simulations providing qualitative and quantitative information on reducing active and reactive energy losses in motors, and on parameters and constructive solution. The optimization study applied the minimal operating costs criterion, and it took into account the starting restrictive conditions. Thirteen variables regarding electromagnetic stresses and main constructive dimensions were considered. The operating costs of the optimized motor decreased with 25.6%, as compared to the existing solution. This paper can be a practical and theoretical support for the development and implementation of modern design methods, based on theoretical and experimental study of stationary and transient processes in low power motors, to increase efficiency and power factor.

  13. Distributed Low-Complexity Controller for Wind Power Plant in Derated Operation

    DEFF Research Database (Denmark)

    Biegel, Benjamin; Madjidian, Daria; Spudic, Vedrana

    2013-01-01

    We consider a wind power plant of megawatt wind turbines operating in derated mode. When operating in this mode, the wind power plant controller is free to distribute power set-points to the individual turbines, as long as the total power demand is met. In this work, we design a controller...... that exploits this freedom to reduce the fatigue on the turbines in the wind power plant. We show that the controller can be designed in a decentralized manner, such that each wind turbine is equipped with a local low-complexity controller relying only on few measurements and little communication. As a basis...... for the controller design, a linear wind turbine model is constructed and verified in an operational wind power plant of megawatt turbines. Due to limitations of the wind power plant available for tests, it is not possible to implement the developed controller; instead the final distributed controller is evaluated...

  14. Is it possible long-tern operation of Spanish nuclear power plants?

    International Nuclear Information System (INIS)

    Regano, M.

    2004-01-01

    The long term operation of nuclear power plants beyond 40 years is a reality. Worlswide accumulated operating experience, national and international R and D projects related with the ageing of materials and the specific studies presented to the NRC by more than thirty American plant guarantee that the operation of nuclear power plants beyond 40 years will be carried out with the same or greater safety and reliability factors. The advantages of the long term operation of Spain nuclear power plants are obvious. The implementation of this option will play an important role in complying with the Kyoto compromises, avoiding the emission of 50 million tons of CO2 will contribute to guaranteeing the supply of electricity by generating an additional 600,000 GWh and will contribute to keeping electricity prices down. The total generating cost for the long term operation of nuclear power plants is approximately half that of a new coal or combined cycle plant. Spain is hugely dependent on energy. In this situation, all energies are necessary and the long term operation of nuclear power plants can of course play an important role in covering the gap between offer and demand, guaranteeing supply in the most economic way possible and with the greatest respect for the environment. (Author)

  15. Power suppressed operators and gauge invariance in soft-collinear effective theory

    International Nuclear Information System (INIS)

    Bauer, Christian W.; Pirjol, Dan; Stewart, Iain W.

    2003-01-01

    The form of collinear gauge invariance for power suppressed operators in the soft-collinear effective theory (SCET) is discussed. Using a field redefinition we show that it is possible to make any power suppressed ultrasoft-collinear operators invariant under the original leading order gauge transformations. Our manipulations avoid gauge fixing. The Lagrangians to O(λ 2 ) are given in terms of these new fields. We then give a simple procedure for constructing power suppressed soft-collinear operators in SCET II by using an intermediate theory SCET I

  16. Wind power integration into the automatic generation control of power systems with large-scale wind power

    Directory of Open Access Journals (Sweden)

    Abdul Basit

    2014-10-01

    Full Text Available Transmission system operators have an increased interest in the active participation of wind power plants (WPP in the power balance control of power systems with large wind power penetration. The emphasis in this study is on the integration of WPPs into the automatic generation control (AGC of the power system. The present paper proposes a coordinated control strategy for the AGC between combined heat and power plants (CHPs and WPPs to enhance the security and the reliability of a power system operation in the case of a large wind power penetration. The proposed strategy, described and exemplified for the future Danish power system, takes the hour-ahead regulating power plan for generation and power exchange with neighbouring power systems into account. The performance of the proposed strategy for coordinated secondary control is assessed and discussed by means of simulations for different possible future scenarios, when wind power production in the power system is high and conventional production from CHPs is at a minimum level. The investigation results of the proposed control strategy have shown that the WPPs can actively help the AGC, and reduce the real-time power imbalance in the power system, by down regulating their production when CHPs are unable to provide the required response.

  17. A Stochastic Operational Planning Model for Smart Power Systems

    Directory of Open Access Journals (Sweden)

    Sh. Jadid

    2014-12-01

    Full Text Available Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independent system operator should use a stochastic method to manage them. A Stochastic unit commitment is presented in this paper to schedule various power resources such as distributed generation units, conventional thermal generation units, wind and PV farms, and demand response resources. Demand response resources, interruptible loads, distributed generation units, and conventional thermal generation units are used to provide required reserve for compensating stochastic nature of various resources and loads. In the presented model, resources connected to distribution network can participate in wholesale market through aggregators. Moreover, a novel three-program model which can be used by aggregators is presented in this article. Loads and distributed generation can contract with aggregators by these programs. A three-bus test system and the IEEE RTS are used to illustrate usefulness of the presented model. The results show that ISO can manage the system effectively by using this model

  18. Adequacy of operating reserves for power systems in future european wind power scenarios

    DEFF Research Database (Denmark)

    Das, Kaushik; Litong-Palima, Marisciel; Maule, Petr

    2015-01-01

    operating reserves. To study the effects of these imbalances, anticipated wind scenarios for European power systems are modelled for 2020 and 2030. Wind power forecasts for different time scales and real-time available wind power are modelled. Based on these studies, this paper qualitatively analyzes......Wind power generation is expected to increase in Europe by large extent in future. This will increase variability and uncertainty in power systems. Imbalances caused due to uncertainty in wind power forecast can trigger frequency instability in the system. These imbalances are handled using...... the adequacy of primary and secondary reserves requirements for future European power systems. This paper also discusses the challenges due to the uncertainty in wind power forecasts and their possible solutions for wind installation scenarios for 2020 and 2030....

  19. Effect of operating conditions and environment on properties of materials of PWR type nuclear power plant components

    International Nuclear Information System (INIS)

    Vacek, M.

    1987-01-01

    Operating reliability and service life of PWR type nuclear power plants are discussed with respect to the material properties of the plant components. The effects of the operating environment on the material properties and the methods of their determination are characterized. Discussed are core materials, such as fuel, its cladding and regulating rod materials, and the materials of pipes, steam generators and condensers. The advances in the production of pressure vessel materials and their degradation during operation are treated in great detail. (Z.M.)

  20. Overview of Maximum Power Point Tracking Techniques for Photovoltaic Energy Production Systems

    DEFF Research Database (Denmark)

    Koutroulis, Eftichios; Blaabjerg, Frede

    2017-01-01

    production of PV sources, despite the stochastically varying solar irradiation and ambient temperature conditions. Thereby, the overall efficiency of the PV energy production system is increased. Numerous techniques have been presented during the last decades for implementing the MPPT process in a PV system......A substantial growth of the installed photovoltaic (PV) systems capacity has occurred around the world during the last decade, thus enhancing the availability of electric energy in an environmentally friendly way. The maximum power point tracking (MPPT) technique enables to maximize the energy....... This chapter provides an overview of the operating principles of these techniques, which are suited for either uniform or nonuniform solar irradiation conditions. The operational characteristics and implementation requirements of these MPPT methods are also analyzed in order to demonstrate their performance...

  1. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  2. Thermodynamic evaluation of geothermal energy powered hydrogen production by PEM water electrolysis

    International Nuclear Information System (INIS)

    Yilmaz, Ceyhun; Kanoglu, Mehmet

    2014-01-01

    Thermodynamic energy and exergy analysis of a PEM water electrolyzer driven by geothermal power for hydrogen production is performed. For this purpose, work is produced from a geothermal resource by means of the organic Rankine cycle; the resulting work is used as a work input for an electrolysis process; and electrolysis water is preheated by the waste geothermal water. The first and second-law based performance parameters are identified for the considered system and the system performance is evaluated. The effects of geothermal water and electrolysis temperatures on the amount of hydrogen production are studied and these parameters are found to be proportional to each other. We consider a geothermal resource at 160 °C available at a rate of 100 kg/s. Under realistic operating conditions, 3810 kW power can be produced in a binary geothermal power plant. The produced power is used for the electrolysis process. The electrolysis water can be preheated to 80 °C by the geothermal water leaving the power plant and hydrogen can be produced at a rate of 0.0340 kg/s. The energy and exergy efficiencies of the binary geothermal power plant are 11.4% and 45.1%, respectively. The corresponding efficiencies for the electrolysis system are 64.0% and 61.6%, respectively, and those for the overall system are 6.7% and 23.8%, respectively. - Highlights: • Thermodynamic analysis of hydrogen production by PEM electrolysis powered by geothermal energy. • Power is used for electrolyser; used geothermal water is for preheating electrolysis water. • Effect of geothermal water and electrolysis temperatures on the amount of hydrogen production. • Hydrogen can be produced at a rate of 0.0340 kg/s for a resource at 160 °C available at 100 kg/s. • Energy and exergy efficiencies of the overall system are 6.7% and 23.8%, respectively

  3. Mapping Wind Farm Loads and Power Production - A Case Study on Horns Rev 1

    DEFF Research Database (Denmark)

    Galinos, Christos; Dimitrov, Nikolay Krasimirov; Larsen, Torben J.

    2016-01-01

    , the ones facing a free sector towards west and south. The power production results of few turbines are compared with SCADA data. The results of this paper are expected to have significance for operation and maintenance planning, where the schedules for inspection and service activities can be adjusted...

  4. Distributed Optimization of Sustainable Power Dispatch and Flexible Consumer Loads for Resilient Power Grid Operations

    Science.gov (United States)

    Srikantha, Pirathayini

    Today's electric grid is rapidly evolving to provision for heterogeneous system components (e.g. intermittent generation, electric vehicles, storage devices, etc.) while catering to diverse consumer power demand patterns. In order to accommodate this changing landscape, the widespread integration of cyber communication with physical components can be witnessed in all tenets of the modern power grid. This ubiquitous connectivity provides an elevated level of awareness and decision-making ability to system operators. Moreover, devices that were typically passive in the traditional grid are now `smarter' as these can respond to remote signals, learn about local conditions and even make their own actuation decisions if necessary. These advantages can be leveraged to reap unprecedented long-term benefits that include sustainable, efficient and economical power grid operations. Furthermore, challenges introduced by emerging trends in the grid such as high penetration of distributed energy sources, rising power demands, deregulations and cyber-security concerns due to vulnerabilities in standard communication protocols can be overcome by tapping onto the active nature of modern power grid components. In this thesis, distributed constructs in optimization and game theory are utilized to design the seamless real-time integration of a large number of heterogeneous power components such as distributed energy sources with highly fluctuating generation capacities and flexible power consumers with varying demand patterns to achieve optimal operations across multiple levels of hierarchy in the power grid. Specifically, advanced data acquisition, cloud analytics (such as prediction), control and storage systems are leveraged to promote sustainable and economical grid operations while ensuring that physical network, generation and consumer comfort requirements are met. Moreover, privacy and security considerations are incorporated into the core of the proposed designs and these

  5. From wind ensembles to probabilistic information about future wind power production - results from an actual application

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg; Nielsen, Torben Skov; Madsen, Henrik

    2006-01-01

    on the wind power ensemble forecasts. Given measurements of power production, representing a region or a single wind farm, we have developed methods applicable for these two steps. While (ii) should in principle be a simple task we found that the probabilistic information contained in the wind power ensembles...... horizon we aim at supplying quantiles of the wind power production conditional on the information available at the time at which the forecast is generated. This involves: (i) transformation of meteorological ensemble forecasts into wind power ensemble forecasts and (ii) calculation of quantiles based....... The application use ECMWF-ensembles. One setup corresponds to an offshore wind farm (Nysted, Denmark) and one corresponds to regional forecasting (Western Denmark). In the paper we analyze the results obtained from 8 months of actual operation of this system. It is concluded that the demo-application produce...

  6. Safety and operation of the Stade nuclear power plant

    International Nuclear Information System (INIS)

    Salcher, H.

    1991-01-01

    The concept of PreussenElektra is to continuously increase the existing safety standard of the Stade nuclear power station using experience gained from faults and operation in nuclear power stations and the progressive state of the art. Modifications to achieve the most gentle operation of the plant have been completed and other are on-going. To do so instruments were attached to those components which are susceptible to fatigue to record the transients and extensive calculatory records were kept. Although the plant has almost 20 years successful operation behind it, it can still stand up well to comparisons with more recent plants as far as safety aspects are concerned. 6 figs

  7. Control-oriented modeling of the energy-production of a synchronous generator in a nuclear power plant

    International Nuclear Information System (INIS)

    Fodor, Attila; Magyar, Attila; Hangos, Katalin M.

    2012-01-01

    Nuclear Power Plant (Hungary) is developed in this paper based on first engineering principles that is able to describe the time-varying active and reactive power output of the generator. These generators are required to take part in the reactive power support of the power grid following the demand of a central dispatch center, and also contribute to the frequency control of the grid. The developed model has been verified under the usual controlled operating conditions when the frequency and the active power are controlled. Static and dynamic sensitivity analysis has been applied to determine the model parameters to be estimated. The model parameters have been estimated applying the asynchronous parallel pattern search method using real measured data from the nuclear power plant. The confidence regions in the parameter space have been analyzed by investigating the geometry of the estimation error function. The developed model can serve as a basis for controlling the optimal energy production of the generator using both the active and reactive power components. -- Highlights: ► A dynamic model of a synchronous generator in a Nuclear Power Plant is developed. ► The model has been verified under the usual controlled operating conditions. ► The sensitivity analysis has been applied to determine the model parameters. ► The parameters have been estimated applying the APPS method using measured data. ► The model serves as a basis for controlling the optimal energy production of the generator.

  8. Research on professional adaptability psychological selection indices of nuclear power plant operators

    International Nuclear Information System (INIS)

    Liu Jingquan; Li Zhe; Li Maoyou

    2010-01-01

    Based on the analysis of the work characteristics of nuclear power plant operators and the comparison of professional psychological selection indices for different occupations, the indices of psychological selection system which is applicable to nuclear power plant operators are proposed in this paper, using the method named 'taking classes,cross-comparison'. The index results of the suggested psychological selection system reflects all the professional requirements on the nuclear power plant operators, which can also be used for the recruitment, training and the retraining programs for operators. (authors)

  9. Supporting Control Room Operators in Highly Automated Future Power Networks

    DEFF Research Database (Denmark)

    Chen, Minjiang; Catterson, Victoria; Syed, Mazheruddin

    2017-01-01

    Operating power systems is an extremely challenging task, not least because power systems have become highly interconnected, as well as the range of network issues that can occur. It is therefore a necessity to develop decision support systems and visualisation that can effectively support the hu...... the human operators for decisionmaking in the complex and dynamic environment of future highly automated power system. This paper aims to investigate the decision support functions associated with frequency deviation events for the proposed Web of Cells concept....

  10. REDUCING POWER PRODUCTION COSTS BY UTILIZING PETROLEUM COKE

    Energy Technology Data Exchange (ETDEWEB)

    Kevin C. Galbreath; Donald L. Toman; Christopher J. Zygarlicke

    1999-09-01

    Petroleum coke, a byproduct of the petroleum-refining process, is an attractive primary or supplemental fuel for power production primarily because of a progressive and predictable increase in the production volumes of petroleum coke (1, 2). Petroleum coke is most commonly blended with coal in proportions suitable to meet sulfur emission compliance. Petroleum coke is generally less reactive than coal; therefore, the cofiring of petroleum coke with coal typically improves ignition, flame stability, and carbon loss relative to the combustion of petroleum coke alone. Although petroleum coke is a desirable fuel for producing relatively inexpensive electrical power, concerns about the effects of petroleum coke blending on combustion and pollution control processes exist in the coal-fired utility industry (3). The Energy & Environmental Research Center (EERC) completed a 2-year technical assessment of petroleum coke as a supplemental fuel. A survey questionnaire was sent to seven electric utility companies that are currently cofiring coal and petroleum coke in an effort to solicit specific suggestions on research needs and fuel selections. An example of the letter and survey questionnaire is presented in Appendix A. Interest was expressed by most utilities in evaluating the effects of petroleum coke blending on grindability, combustion reactivity, fouling, slagging, and fly ash emissions control. Unexpectedly, concern over corrosion was not expressed by the utilities contacted. Although all seven utilities responded to the question, only two utilities, Northern States Power Company (NSP) and Ameren, sent fuels to the EERC for evaluation. Both utilities sent subbituminous coals from the Power River Basin and petroleum shot coke samples. Petroleum shot coke is produced unintentionally during operational upsets in the petroleum refining process. This report evaluates the effects of petroleum shot coke blending on grindability, fuel reactivity, fouling/slagging, and

  11. Complex analysis of hazards to the man and natural environment due to electricity production in nuclear and coal power plants

    International Nuclear Information System (INIS)

    Strupczewski, A.

    1990-01-01

    The report presents a complex analysis of hazards connected with electrical energy production in nuclear power plants and coal power plants, starting with fuel mining, through power plant construction, operation, possible accidents and decommissioning to long term global effects. The comparison is based on contemporary, proven technologies of coal fired power plants and nuclear power plants with pressurized water reactors. The hazards to environment and man due to nuclear power are shown to be much smaller than those due to coal power cycle. The health benefits due to electrical power availability are shown to be much larger than the health losses due to its production. (author). 71 refs, 17 figs, 12 tabs

  12. Current trends in codal requirements for safety in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Srivasista, K.; Shah, Y.K.; Gupta, S.K.

    2006-01-01

    The Code of practice on safety in nuclear power plant operation states the requirements to be met during operation of a nuclear power plant for assuring safety. Among various stages of authorization, regulatory body issues authorization for operation of a nuclear power plant, monitors and enforces regulatory requirements. The responsible organization shall have overall responsibility and the plant management shall have the primary responsibility for ensuring safe and efficient operation of its nuclear power plants. A set of codal requirements covering technical and administrative aspects are mandatory for the plant management to implement to ensure that the nuclear power plant is operated in accordance with the design intent. Requirements on operating procedures and instructions establish operation and maintenance, inspection and testing of the plant in a planned and systematic way. The requirements on emergency preparedness programme establish with a reasonable assurance that, in the event of an emergency situation, appropriate measures can be taken to mitigate the consequences. Commissioning requirements verify performance criteria during commissioning to ensure that the design intent and QA requirements are met. Several modifications in systems important to safety required during operation of a nuclear power plant are regulated. However new operational codal requirements arising out of periodic safety review, operational experience feedback, life management, probabilistic safety assessment, physical security, safety convention and obligations and decommissioning are not covered in the present code of practice for safety in nuclear power plant operation. Codal provisions on 'Review by operating organization on aspects of design having implications on operability' are also required to be addressed. The merits in developing such a methodology include acceptance of the design by operating organization, ensuring maintainability, proper layout etc. in the new designs

  13. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ying; Zhou, Zhi; Botterud, Audun; Zhang, Kaifeng

    2018-01-01

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixed integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.

  14. Application of the discounted value flows method in production cost calculations for Czechoslovak nuclear power plants

    International Nuclear Information System (INIS)

    Majer, P.

    1990-01-01

    The fundamentals are outlined of the discounted value flows method, which is used in industrial countries for calculating the specific electricity production costs. Actual calculations were performed for the first two units of the Temelin nuclear power plant. All costs associated with the construction, operation and decommissioning of this nuclear power plant were taken into account. With a high degree of certainty, the specific production costs of the Temelin nuclear power plant will lie within the range of 0.32 to 0.36 CSK/kWh. Nearly all results of the sensitivity analysis performed for the possible changes in the input values fall within this range. An increase in the interest rate to above 8% is an exception; this, however, can be regarded as rather improbable on a long-term basis. Sensitivity analysis gave evidence that the results of the electricity production cost calculations for the Temelin nuclear power plant can be considered sufficiently stable. (Z.M.). 7 figs., 2 tabs., 14 refs

  15. The integration of the periodic production in the liberalized electric power markets: from the technic expenditures to the economic taxes imposed by the operating rules of the markets

    International Nuclear Information System (INIS)

    Menanteau, Ph.; Finon, D.; Lamy, M.L.

    2003-03-01

    In the framework of the climatic change and the energy supply safety, the european directive aims to promote the renewable energy production in Europe. Some of the renewable energy sources, as the wind power or the micro-hydroelectric power, are naturally periodic. Their introduction in the electric networks will create problems because of this periodic nature, problems which are new for the electric network producers and managers. These problems generate technical expenditures, which may be compensate by the economic penalties of the electric power market operating. In this context the document details the expenditures associated to the periodicity, the economic penalties by an analysis of the british market and analyses the possibilities to limit these economic penalties in order to reduce the conflicts between the electric market liberalization and the promotion of the renewable energies development. (A.L.B.)

  16. Plant life management for long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    2005-01-01

    The world's fleet of Nuclear Power Plants (NPPs) is approximately 20 years old on average, and most plants are believed to be able to operate for 60 years or more. The design life of a NPP is typically 30 to 40 years. This may be extended by 10 to 20 years, or more, provided that the plant can demonstrate by analysis, trending, equipment and system upgrades, increased vigilance, testing, ageing management, and other means that license renewal presents no threat to public health and safety. The basic goal of Plant Life Management (PLiM) is to satisfy requirements for safe long-term supplies of electricity in an economically competitive way. The basic goal of the operating company and the owners to operate as long as economically reasonable and possible from safety point of view. PLiM is a management tool for doing that. PLiM is a system of programmes and procedures to satisfy safety requirements for safe operation and for power production in a competitive way and for time which is rational from technical and economical point of view. PLiM is not only a technical system, it is also an attitude of the operational company to keep the plant in operation as long as possible from safety and business point of view. The common objectives of PLiM assessment is to help and review the pre-conditions for PLiM and long-term operation approaches. PLiM should not be associated with extension of operational life-time of the NPP only. It is an owner's attitude and rational approach of the operating company to run the business economically and safely. The effectiveness of PLiM Programme can be assessed by three complementary kinds of assessment: self-assessment, peer review and comprehensive programme review by the plant owner/ operator. IAEA will provide the assessment service for peer review of PLiM. Preparation for a PLiM Assessment service will be initiated only after the IAEA has been formally approached by a MS and funding (e.g. an existing Technical cooperation project) has

  17. Nuclear energy products except the electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Technically the fission reactors, on service or under construction, can produce other products than the electric power. Meanwhile, these applications are known since the beginning of the reactors exploitation, they never have been developed industrially. This report examines the necessary technical characteristics for using the nuclear systems on non electric power applications with an economical efficiency. What are the markets for these products? What are the strategical challenges to favor the development of non electric power applications of the nuclear energy? (A.L.B.)

  18. Scheduled Operation of PV Power Station Considering Solar Radiation Forecast Error

    Science.gov (United States)

    Takayama, Satoshi; Hara, Ryoichi; Kita, Hiroyuki; Ito, Takamitsu; Ueda, Yoshinobu; Saito, Yutaka; Takitani, Katsuyuki; Yamaguchi, Koji

    Massive penetration of photovoltaic generation (PV) power stations may cause some serious impacts on a power system operation due to their volatile and unpredictable output. Growth of uncertainty may require larger operating reserve capacity and regulating capacity. Therefore, in order to utilize a PV power station as an alternative for an existing power plant, improvement in controllability and adjustability of station output become very important factor. Purpose of this paper is to develop the scheduled operation technique using a battery system (NAS battery) and the meteorological forecast. The performance of scheduled operation strongly depends on the accuracy of solar radiation forecast. However, the solar radiation forecast contains error. This paper proposes scheduling method and rescheduling method considering the trend of forecast error. More specifically, the forecast error scenario is modeled by means of the clustering analysis of the past actual forecast error. Validity and effectiveness of the proposed method is ascertained through computational simulations using the actual PV generation data monitored at the Wakkanai PV power station and solar radiation forecast data provided by the Japan Weather Association.

  19. Operating experience with nuclear power stations in Member States in 1997

    International Nuclear Information System (INIS)

    1998-12-01

    This report is twenty-ninth in the IAEA series of annual reports on operating experience with nuclear power stations in Member States. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose database contains all operating experience data published in Agency's operating experience annual reports published since 1971 and basic information on power reactors, including design data. According to the information available to the Agency at the end of 1997, there were 437 nuclear power reactors having a total capacity of 351795 MW(e). During 1997 three new reactors having total capacity of 3555 MW(e) were connected to the grid in France and the Republic of Korea. There were 36 nuclear power plants under construction in the world. Load, operation and availability factors are used as the basic performance factors. In addition to annual performance data and outage information, the report contains a historical summary of performance and outages during the lifetime of individual plants and five figures illustrating worldwide performance and statistical data

  20. Theory model and experiment research about the cognition reliability of nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; Zhao Bingquan

    2000-01-01

    In order to improve the reliability of NPP operation, the simulation research on the reliability of nuclear power plant operators is needed. Making use of simulator of nuclear power plant as research platform, and taking the present international reliability research model-human cognition reliability for reference, the part of the model is modified according to the actual status of Chinese nuclear power plant operators and the research model of Chinese nuclear power plant operators obtained based on two-parameter Weibull distribution. Experiments about the reliability of nuclear power plant operators are carried out using the two-parameter Weibull distribution research model. Compared with those in the world, the same results are achieved. The research would be beneficial to the operation safety of nuclear power plant

  1. Research on psychological evaluation method for nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; He Xuhong; Zhao Bingquan

    2007-01-01

    The qualitative and quantitative psychology evaluation methods to the nuclear power plant operators were analyzed and discussed in the paper. The comparison analysis to the scope and result of application was carried out between method of outline figure fitted and method of fuzzy synthetic evaluation. The research results can be referenced to the evaluation of nuclear power plant operators. (authors)

  2. Automatic Power Control for Daily Load-following Operation using Model Predictive Control Method

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Keuk Jong; Kim, Han Gon [KH, Daejeon (Korea, Republic of)

    2009-10-15

    Under the circumstances that nuclear power occupies more than 50%, nuclear power plants are required to be operated on load-following operation in order to make the effective management of electric grid system and enhanced responsiveness to rapid changes in power demand. Conventional reactors such as the OPR1000 and APR1400 have a regulating system that controls the average temperature of the reactor core relation to the reference temperature. This conventional method has the advantages of proven technology and ease of implementation. However, this method is unsuitable for controlling the axial power shape, particularly the load following operation. Accordingly, this paper reports on the development of a model predictive control method which is able to control the reactor power and the axial shape index. The purpose of this study is to analyze the behavior of nuclear reactor power and the axial power shape by using a model predictive control method when the power is increased and decreased for a daily load following operation. The study confirms that deviations in the axial shape index (ASI) are within the operating limit.

  3. Influence of Buoyancy Control Performance on Power Production by the Wave Dragon Nissum Bredning Prototype

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Tedd, James; Friis-Madsen, E.

    2007-01-01

    This paper reports on the real sea performance of the buoyancy control system of Wave Dragon, a floating wave energy converter using the overtopping principle. The device operates with the full independent control system which has been tested during three years of operation. The impact of the buo...... of the buoyancy control system performance on the power production is noted. This provides motivation and a target for improved control algorithms....

  4. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  5. Daya Bay Nuclear Power Station operation and management indicators system

    International Nuclear Information System (INIS)

    Fang Chunfa

    2000-01-01

    Ever since the commercial operation of Daya Bay Nuclear Power Station (GNPS), dynamic objective management concept that features modern enterprises has been adopted by the station to manage all operational activities with the guidance of business plan. And some quantitative indicators have been employed in order to measure effectively the progress status of these operational activities. After several years' evolvement, a hierarchical and standard performance indicators system has been developed and is playing an active part in the plant's efforts towards top quartile of world nuclear power industry. Structured hierarchically with higher levels resolving into lower levels and lower levels committing to higher levels, the indicator system represents the corporate vision, WANO (World Association of Nuclear Operators) performance indicators, plant integrated indicators and departmental key indicators, covering such areas as safety, production, environment, human resource and cost control. The indicator system not only reflects performance-centered management concept, but also shows the controllability of the whole operational process of the station. Indicators of a certain level serve as both early warnings to superior indicators (lagging indicators in this case) and effects to inferior indicators (leading indicators in this case). The dynamic status of these indicators, numbered more than 230, will eventually be fed back to the business plan and realized through daily work of every branch, and even every member of the workforce. With the indicator system as a quantitative management tool, and an effective tracking system, GNPS has achieved great success in self-assessment, objective definition, improvement follow up, resource re-allocation, and management-staff communication. Periodic plant performance assessment is performed through spider chart and other pictorial diagrams. Indicators are displayed at the plant entrance, offices, Main Control Room and SIS network

  6. Personality Factors and Nuclear Power Plant Operators: Initial License Success

    Science.gov (United States)

    DeVita-Cochrane, Cynthia

    Commercial nuclear power utilities are under pressure to effectively recruit and retain licensed reactor operators in light of poor candidate training completion rates and recent candidate failures on the Nuclear Regulatory Commission (NRC) license exam. One candidate failure can cost a utility over $400,000, making the successful licensing of new operators a critical path to operational excellence. This study was designed to discover if the NEO-PI-3, a 5-factor measure of personality, could improve selection in nuclear utilities by identifying personality factors that predict license candidate success. Two large U.S. commercial nuclear power corporations provided potential participant contact information and candidate results on the 2014 NRC exam from their nuclear power units nation-wide. License candidates who participated (n = 75) completed the NEO-PI-3 personality test and results were compared to 3 outcomes on the NRC exam: written exam, simulated operating exam, and overall exam result. Significant correlations were found between several personality factors and both written and operating exam outcomes on the NRC exam. Further, a regression analysis indicated that personality factors, particularly Conscientiousness, predicted simulated operating exam scores. The results of this study may be used to support the use of the NEO-PI-3 to improve operator selection as an addition to the current selection protocol. Positive social change implications from this study include support for the use of a personality measure by utilities to improve their return-on-investment in candidates and by individual candidates to avoid career failures. The results of this study may also positively impact the public by supporting the safe and reliable operation of commercial nuclear power utilities in the United States.

  7. The operating staff of nuclear power plants

    International Nuclear Information System (INIS)

    Schlegel, G.; Christ, W.

    1988-01-01

    The training of its staff is one of the pillars of the safe and economical operation of a power plant. This is why power plant owners began to systematically train their staff already in the 50s, and why they created central training facilities. Staff members who have undergone this training make an indispensable contribution to the acceptedly high safety and availability of German power plants. The substantial cost of creating training facilities and of schooling plant staff is considered to be an investment for the future. Low labour turnover permits careful observation and development of staff and leads to a high standard of knowledge and experience. (orig./HSCH) [de

  8. Hydrogen production from formic acid in pH-stat fed-batch operation for direct supply to fuel cell.

    Science.gov (United States)

    Shin, Jong-Hwan; Yoon, Jong Hyun; Lee, Seung Hoon; Park, Tai Hyun

    2010-01-01

    Enterobacter asburiae SNU-1 harvested after cultivation was used as a whole cell biocatalyst, for the production of hydrogen. Formic acid was efficiently converted to hydrogen using the harvested cells with an initial hydrogen production rate and total hydrogen production of 491 ml/l/h and 6668 ml/l, respectively, when 1 g/l of whole cell enzyme was used. Moreover, new pH-stat fed-batch operation was conducted, and total hydrogen production was 1.4 times higher than that of batch operation. For practical application, bio-hydrogen produced from formic acid using harvested cells was directly applied to PEMFC for power generation.

  9. Licensing operators for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1988-01-01

    The human element in the operation of commercial nuclear power plants is of utmost importance. Not only must the operators be technically competent in the execution of numerous complicated tasks, they must be capable of working together as a team to diagnose dynamic plant conditions to ensure that their plants are operated safely. The significance of human interaction skills and crew communications has been demonstrated most vividly in TMI and Chernobyl. It follows that the NRC must retain its high standards for licensing operators. This paper discusses activities and initiatives being employed by the NRC to enhance the reliability of its licensing examinations, and to build a highly qualified examiner work force

  10. Electric Vehicles for Improved Operation of Power Systems with High Wind Power Penetration

    OpenAIRE

    Larsen, Esben; Chandrashekhara, Divya K; Østergaard, Jacob

    2008-01-01

    In a power system with a high share of wind energy the wind fluctuation causes a variation in the power generation, which must be compensated from other sources. The situation in Denmark with a penetration of more than 20% wind in yearly average is presented. The introduction of electric drive vehicles (EDV) as flexible loads can improve the system operation. Bidirectional power exchange through batteries (vehicle to grid) can be seen as a storage system in the grid. An analysis of possible e...

  11. Product variety, product complexity and manufacturing operational performance: A systematic literature review

    DEFF Research Database (Denmark)

    Trattner, Alexandria Lee; Hvam, Lars; Herbert-Hansen, Zaza Nadja Lee

    Manufacturing in the twenty-first century has been wrought with the struggle to satisfy the rising demand for greater product variety and more complex products while still maintaining efficient manufacturing operations. However, the literature lacks an overview of which operational performance...... measures are most affected by increased variety and complexity. This study presents a systematic literature review of the recent scholarly literature on variety, complexity and manufacturing operational performance (MOP). Results show that product variety has a consistently negative relationship with MOP...... across different time, cost, quality and flexibility measures while product complexity lacks evidence of strong relationships with MOP measures....

  12. Analytical modeling of nuclear power station operator reliability

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    The operator-plant interface is a critical component of power stations which requires the formulation of mathematical models to be applied in plant reliability analysis. The human model introduced here is based on cybernetic interactions and allows for use of available data from psychological experiments, hot and cold training and normal operation. The operator model is identified and integrated in the control and protection systems. The availability and reliability are given for different segments of the operator task and for specific periods of the operator life: namely, training, operation and vigilance or near retirement periods. The results can be easily and directly incorporated in system reliability analysis. (author)

  13. EDP systems for the operational management of nuclear power plant

    International Nuclear Information System (INIS)

    Doerler, R.

    1987-01-01

    An EDP-aided operational management system is to be understood as the total of all organizational conditions (structural organization, procedural organization) and technical means, and is intended to give the individual person a better overview to fulfill his/her responsibilities. The introduction of such a system is aimed at providing the operating personnel with a set of tools matching today's technology for management and administration systems which will enable them to fulfill their tasks in an optimum way. Powerful EDP systems are already used in many nuclear power plants to control and monitor operating processes and to collect and evaluate operational data. (orig./DG) [de

  14. Characterization of biomass producer gas as fuel for stationary gas engines in combined heat and power production

    DEFF Research Database (Denmark)

    Ahrenfeldt, Jesper

    2008-01-01

    The aim of this project has been the characterization of biomass producer gas as a fuel for stationary gas engines in heat and power production. More than 3200 hours of gas engine operation, with producer gas as fuel, has been conducted at the biomass gasification combined heat and power (CHP...... different measuring methods. Likewise, no particles were detected in the gas. Considerable amounts of NH3 were measured in the produced gas.An analysis of engine operation at varying load has been carried out. Standard emissions, load and efficiency have been measured at varying operating conditions ranging...... from 50% to 90% load. Biomass producer gas is an excellent lean burn engine fuel: Operation of a natural aspirated engine has been achieved for 1.2...

  15. Cost allocation. Combined heat and power production

    International Nuclear Information System (INIS)

    Sidzikauskas, V.

    2002-01-01

    The benefits of Combined Heat and Power (CHP) generation are discussed. The include improvement in energy intensity of 1% by 2010, 85-90% efficiency versus 40-50% of condensation power and others. Share of CHP electricity production in ERRA countries is presented.Solutions for a development CHP cost allocation are considered. Conclusion are presented for CHP production cost allocation. (R.P.)

  16. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Morton, L.; Smith, N. [Ontario Power Generation, Tiverton, ON (Canada)

    2011-07-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  17. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    International Nuclear Information System (INIS)

    Morton, L.; Smith, N.

    2011-01-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  18. Wind power plant in grid operation

    International Nuclear Information System (INIS)

    Heier, S.

    1993-01-01

    There are new prospects for electrical energy supply in coastal regions and on islands if one succeeds in integrating the available wind energy, dependent on the weather, into existing and to be developed supply structures. Apart from the supply of energy, effects on the grid and on the electrical consumer are gaining in importance. For wind power plants, the operating behaviour is appreciably determined by the electro-technical concept. The mechanical/electrical energy conversion with the corresponding grid connection and plant control play an important part here. Results of measurements and computer simulation make the differences in the behaviour of wind power plants clear. (orig.) [de

  19. Operational, design and microbial aspects related to power production with microbial fuel cells implemented in constructed wetlands.

    Science.gov (United States)

    Corbella, Clara; Guivernau, Miriam; Viñas, Marc; Puigagut, Jaume

    2015-11-01

    This work aimed at determining the amount of energy that can be harvested by implementing microbial fuel cells (MFC) in horizontal subsurface constructed wetlands (HSSF CWs) during the treatment of real domestic wastewater. To this aim, MFC were implemented in a pilot plant based on two HSSF CW, one fed with primary settled wastewater (Settler line) and the other fed with the effluent of a hydrolytic up-flow sludge blanket reactor (HUSB line). The eubacterial and archaeal community was profiled on wetland gravel, MFC electrodes and primary treated wastewater by means of 16S rRNA gene-based 454-pyrosequencing and qPCR of 16S rRNA and mcrA genes. Maximum current (219 mA/m(2)) and power (36 mW/m(2)) densities were obtained for the HUSB line. Power production pattern correlated well with water level fluctuations within the wetlands, whereas the type of primary treatment implemented had a significant impact on the diversity and relative abundance of eubacteria communities colonizing MFC. It is worth noticing the high predominance (13-16% of relative abundance) of one OTU belonging to Geobacter on active MFC of the HUSB line that was absent for the settler line MFC. Hence, MFC show promise for power production in constructed wetlands receiving the effluent of a HUSB reactor. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Investigation of the Bilibin reactor operation in the regime of automatic power and frequency control in isolated power system

    International Nuclear Information System (INIS)

    Sankovskij, G.A.; Molochkov, V.I.; Dolgov, V.V.; Soldatov, G.E.; Minashin, M.E.

    1981-01-01

    The results of experimental investigations of the power unit operation of the Bilibin nuclear power and heating plant (BNPHP) in the regime of automatic power and frequency control in an isolated power system are presented. The BNPHP comprises four similar power units. Each unit includes a steam generating setup - the channel water-graphite reactor with tubular fuel elements with natural circulation of boiling water at all the power levels as well as a turbosetup with two heat selectors and a turbogenerator. The turbine operates on dry saturated steam (with intermediate separation) which is brought from the drum-separator of the reactor natural circulation circuit. The BNPHP operates according to the controller schedule since the start-up of the first power unit. The BNPHP unit power varifies within the 50-100% range 3-4 times per day (by the number of maxima in the schedule of the power system loadings). Two design flowsheets of the unit power control and dynamic characteristics of the system for both vatiants are considered. It is concluded that both investigated automatic control systems are seviceable and deviations of the reactor parameters within the transients are not dangerous for heat release from the core. The plant is better shielded from external mainly short-term perturbations coming from the power system when the system operates in accordance with the first variant of the flowsheet [ru