  1. Advanced solar concentrator mass production, operation, and maintenance cost assessment

    Science.gov (United States)

    Niemeyer, W. A.; Bedard, R. J.; Bell, D. M.

    1981-01-01

    The object of this assessment was to estimate the costs of the preliminary design at: production rates of 100 to 1,000,000 concentrators per year; concentrators per aperture diameters of 5, 10, 11, and 15 meters; and various receiver/power conversion package weights. The design of the cellular glass substrate Advanced Solar Concentrator is presented. The concentrator is an 11 meter diameter, two axis tracking, parabolic dish solar concentrator. The reflective surface of this design consists of inner and outer groups of mirror glass/cellular glass gores.

  2. AREVA NP products and services for NPP operation and maintenance improvement

    International Nuclear Information System (INIS)

    Dechelette, Anne; Rat, Guy Le

    2009-01-01

    AREVA supplies customized services throughout the reactor improvement process according to clients' requirements: safety, performance, availability, obsolescence, operating and maintenance conditions, environment and technical assistance. Form design studies to on site modification and implementation including requalification tests, AREVA, as OEM*, has various products and services in the field of Engineering and Upgrading to satisfy client demands. In keeping with Inpo's AP913 approach, AREVA is particularly skilled in this methodology to help utilities improve availability factor and maintenance programs. AREVA has customized its services to many utilities in cooperating with local partners, suppliers, and engineering service providers through partnerships, consortiums, joint ventures, etc. AREVA's knowledge of the fleet's operation and maintenance experience helps NPP clients to identify the most cost effective improvements and approaches. Different examples of modifications of modifications and improvements performed in France and abroad illustrate AREVA's involvement in the NPP continuous upgrade process

  3. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis

    Directory of Open Access Journals (Sweden)

    Mohd Norhasni Mohd Asaad

    2014-02-01

    Full Text Available Abstract. Market globalization, competitive product and services, high economic crises are the most critical factors that influence the success of the manufacturing companies in global market. Therefore it is critical to the manufacturing companies to be efficient in production and lean tool may used to achieve that.  The most frequently used is the Total Preventive Maintenance (TPM, even though there are many studies have been conducted in relation to the TPM but there is limited research in investigating the effects of the TPM on operational performance. However, the result of the studies was not consistent, where TPM practice may have positive and negative impact on operational performance. Among the reason is the culture of the organization that influenced the implementation of TPM and operational performance. Due to that this study attempts to investigate the influence of organizational culture on the TPM implementation and operational performance.  Rasch model is used in this study due to its ability in interpreting and analyzing the ability of respondents in performing the difficult items. The online questionnaires were distributed to 63 randomly selected automotive companies located at Northern Region of Malaysia.  Results of the study revealed that the organizational culture has influenced on the successful implementation of TPM and operational performance. Therefore by the implementation of TPM in outstanding organizational culture can improve operational performance.   Keyword: Total Preventive Maintenance (TPM, Lean manufacturing, Operational performance, Organizational culture, Rasch modeldoi:10.12695/ajtm.2013.6.2.2How to cite this article:Mohd Asaad, M.N and Yusoff, R.Z. (2013. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis . The Asian Journal of Technology Management 6 (2: 72-81. Print ISSN: 1978-6956; Online ISSN: 2089-791X.  doi:10.12695/ajtm

  4. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    DUNCAN, G.P.

    1999-01-01

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  5. Production and Maintenance Planning for a Deteriorating System with Operation-Dependent Defectives

    Directory of Open Access Journals (Sweden)

    Héctor Rivera-Gómez

    2018-01-01

    Full Text Available This paper provides new insights to the area of sustainable manufacturing systems at analyzing the novel paradigm of integrated production logistics, quality, and maintenance design. For this purpose, we investigate the optimal production and repair/major maintenance switching strategy of an unreliable deteriorating manufacturing system. The effects of the deterioration process are mainly observed on the failure intensity and on the quality of the parts produced, where the rate of defectives depends on the production rate. When unplanned failures occur, either a minimal repair or a major maintenance could be conducted. The integration of availability and quality deterioration led us to propose a new stochastic dynamic programming model where optimality conditions are derived through the Hamilton-Jacobi-Bellman equations. The model defined the joint production and repair/major maintenance switching strategies minimizing the total cost over an infinite planning horizon. In the results, the influence of the deterioration process were evident in both the production and maintenances control parameters. A numerical example and an extensive sensitivity analysis were conducted to illustrate the usefulness of the results. Finally, the proposed control policy was compared with alternative strategies based on common assumptions of the literature in order to illustrate its efficiency.

  6. Operator-Oriented Product and Production Process Design for Manufacturing, Maintenance and Upgrading

    NARCIS (Netherlands)

    Rhijn, G. van; Bosch, T.

    2017-01-01

    The nature of production in the manufacturing industry is changing, and companies face large challenges. Customers expect fast delivery times, proven sustainability, flexibility, and frequent product upgrades. To stay competitive and manage rapid technological demands, a parallel, iterative and

  7. Organizational Culture Influence on Total Productive Maintenance (TPM) and Operational Performance Using RASCH Model Analysis

    OpenAIRE

    Mohd Asaad, Mohd Norhasni; Yusoff, Rushami Zien

    2013-01-01

    Abstract. Market globalization, competitive product and services, high economic crises are the most critical factors that influence the success of the manufacturing companies in global market. Therefore it is critical to the manufacturing companies to be efficient in production and lean tool may used to achieve that.  The most frequently used is the Total Preventive Maintenance (TPM), even though there are many studies have been conducted in relation to the TPM but there is limited research i...

  8. Exposure Control for Operations and Maintenance at the Accelerator Production of Tritium

    International Nuclear Information System (INIS)

    McGuire, D.H.

    1998-09-01

    The APT will be designed and operated to support continuous tritium production. Tritium is an essential ingredient in U.S. nuclear weapons. The APT will be designed and staffed to support continuous production of tritium by trained, qualified, and certified personnel

  9. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  10. Operations and maintenance performance in oil and gas production assets. Theoretical architecture and capital value theory in perspective

    Energy Technology Data Exchange (ETDEWEB)

    Liyanage, Jayantha P.

    2003-07-01

    to visualize how operations and maintenance performance makes good business sense, and more balanced information and knowledge requirements to support decisions settings. The thesis emphasizes that despite there is a popular demand on this issue, subject matter has not fully been explored within the oil and gas business environment, and even the few of more recent contributions have not adequately addressed the issue. The underlying challenges in this regard are attributed in this thesis to socio-technical complexity and causal ambiguity of operations and maintenance performance within organizational settings. And it furthermore emphasizes that the degree of such complexity and ambiguity are defined by the extent of information and knowledge asymmetries on performance. To address the issue of technical alienation of operations and maintenance performance in oil and gas business terms, the thesis attempt to generate a link between oil and gas business, oil and gas production assets, and operations and maintenance performance. The underlying assertion is that, oil and gas production portfolio of any organization bears a specific role-play in respect of what matters for commercial success of the business, and that role-play in turn is the basis to redefine the mission for operations and maintenance. And also, this mission remains the point of departure for systematic development of operations and maintenance performance architecture. The theoretical architecture that is brought into perspective in this thesis, addresses both the socio-technical complexity by dimensioning operations and maintenance performance into its constituent components, and causal ambiguity simultaneously by incorporating a logic to this dimensioning process. Equally importantly, during this effort, it also pays attention to institute relevance, completeness, and flexibility of the architecture as necessary. Moving further, the thesis elaborates on how this theoretical architecture can be extended

  11. Operations and maintenance performance in oil and gas production assets. Theoretical architecture and capital value theory in perspective

    International Nuclear Information System (INIS)

    Liyanage, Jayantha P.

    2003-01-01

    to visualize how operations and maintenance performance makes good business sense, and more balanced information and knowledge requirements to support decisions settings. The thesis emphasizes that despite there is a popular demand on this issue, subject matter has not fully been explored within the oil and gas business environment, and even the few of more recent contributions have not adequately addressed the issue. The underlying challenges in this regard are attributed in this thesis to socio-technical complexity and causal ambiguity of operations and maintenance performance within organizational settings. And it furthermore emphasizes that the degree of such complexity and ambiguity are defined by the extent of information and knowledge asymmetries on performance. To address the issue of technical alienation of operations and maintenance performance in oil and gas business terms, the thesis attempt to generate a link between oil and gas business, oil and gas production assets, and operations and maintenance performance. The underlying assertion is that, oil and gas production portfolio of any organization bears a specific role-play in respect of what matters for commercial success of the business, and that role-play in turn is the basis to redefine the mission for operations and maintenance. And also, this mission remains the point of departure for systematic development of operations and maintenance performance architecture. The theoretical architecture that is brought into perspective in this thesis, addresses both the socio-technical complexity by dimensioning operations and maintenance performance into its constituent components, and causal ambiguity simultaneously by incorporating a logic to this dimensioning process. Equally importantly, during this effort, it also pays attention to institute relevance, completeness, and flexibility of the architecture as necessary. Moving further, the thesis elaborates on how this theoretical architecture can be extended

  12. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  13. Design for maintenance during operation

    International Nuclear Information System (INIS)

    Barton, P.H.; Lyerly, H.D.

    1976-01-01

    Design of a nuclear power plant for safe, reliable and efficient operation involves much more than theory, regulations, regulatory guides, procedures, inspectors, and even quality assurance. It also involves a full knowledge and understanding of the activities which must be carried out to operate and maintain the plant. It must be remembered that a nuclear power plant is different from fossil designs and the designer must constantly keep in mind that access by people to every component is required for maintenance

  14. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Guidelines for safe process operations and maintenance

    CERN Document Server

    2010-01-01

    First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers ""how-to"" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety

  16. TOTAL PRODUCTIVE MAINTENANCE, A CENTRAL PREOCCUPATION OF THE MANAGERS

    OpenAIRE

    Daniela POPESCU; Adriana SCRIOŞTEANU; ANDREI POPESCU

    2013-01-01

    This present study demonstrates that the role of the mangers in the productive maintenance is currently becoming more important. This assessment is formulated starting from the daily realities regarding the growth of the proportions of productions and along with these the growth of the volume of equipments which need a better care and maintenance for a proper operation. The productive maintenance has developed and emerged out of this necessity. Therefore, the productive maintenance in the eco...

  17. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  18. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  19. Applying knowledge engineering tools for the personal computer to the operation and maintenance of radiopharmaceutical production systems

    International Nuclear Information System (INIS)

    Alexoff, D.L.

    1990-01-01

    A practical consequence of over three decades of Artificial Intelligence (AI) research has been the emergence of Personal Computer-based AI programming tools. A special class of this microcomputer-based software, called expert systems shells, is now applied routinely outside the realm of classical AI to solve many types of problems, particularly in analytical chemistry. These AI tools offer not only some of the advantages inherent to symbolic programming languages, but, as significant, they bring with them advanced program development environments which can facilitate software development and maintenance. Exploitation of this enhanced programming environment was a major motivation for using an AI tool. The goal of this work is to evaluate the use of an example-based expert system shell (1st Class FUSION, 1st Class Expert Systems, Inc.) as a programming tool for developing software useful for automated radiopharmaceutical production

  20. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  1. The operation and maintenance manual

    International Nuclear Information System (INIS)

    Klein, W.; Krotil, H.; Stoll, A.

    1975-01-01

    The Operating Manual is one of many technical documents which the nuclear power plant operator needs for ensuring safe operation. For the operating staff, however, there is only one document, namely the Operating Manual. It contains, appropriately arranged, the necessary system and other diagrams, drawings, lists, licensing documents and similar material, which are necessary for understanding the design, for testing, for obtaining the operating licence and for the operation of individual systems and of the entire plant. (orig./RW) [de

  2. The operation and maintenance manual

    International Nuclear Information System (INIS)

    Stoll, A.; Krotil, H.; Klein, W.

    1976-01-01

    The operating manual is one of many technical documents which the nuclear power plant operator needs for ensuring safe operation. For the operating staff, however, there is only one document, namely the operating manual. The operating manual is an essential element in bringing man and machine in harmony. This is necessary for safe and, as far as possible, uninterrupted operation of the power plant. The operating manual is the only document containing binding instructions for plant operation. All the tasks of plant operation which are carried out by plant staff are described in the operating manual in a form which is as clear and comprehensible as possible. A considerable number of these tasks can only be carried out by man, namely: 1) tasks concerning operational organization, 2) all non-automated areas of plant operation. (orig./TK) [de

  3. Total Productive Maintenance at Paccar INC

    Directory of Open Access Journals (Sweden)

    Ştefan Farkas

    2010-06-01

    Full Text Available This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  4. Total Productive Maintenance at Paccar INC

    OpenAIRE

    Ştefan Farkas

    2010-01-01

    This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  5. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  6. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  7. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  8. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  9. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  10. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  11. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  12. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  13. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current ma...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  14. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  15. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    International Nuclear Information System (INIS)

    Morton, L.; Smith, N.

    2011-01-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  16. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Morton, L.; Smith, N. [Ontario Power Generation, Tiverton, ON (Canada)

    2011-07-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  17. TOTAL PRODUCTIVE MAINTENANCE, A CENTRAL PREOCCUPATION OF THE MANAGERS

    Directory of Open Access Journals (Sweden)

    Daniela POPESCU

    2013-06-01

    Full Text Available This present study demonstrates that the role of the mangers in the productive maintenance is currently becoming more important. This assessment is formulated starting from the daily realities regarding the growth of the proportions of productions and along with these the growth of the volume of equipments which need a better care and maintenance for a proper operation. The productive maintenance has developed and emerged out of this necessity. Therefore, the productive maintenance in the economic theory represents the maintenance of the equipments and fabric at the highest productive level by cooperating with all departments related to production. This aspect points out that the maintenance and repair works of the equipments have to be the main preoccupation of the personnel and especially of the managers.

  18. EHV network operation, maintenance, organization and training

    Energy Technology Data Exchange (ETDEWEB)

    Gravier, J P [Electricite de France (EDF), 75 - Paris (France)

    1994-12-31

    The service interruptions of electricity have an ever increasing social and industrial impact, it is thus fundamental to operate the network to its best level of performances. To face these changing conditions, Electricite de France has consequently adapted its strategy to improve its organization for maintenance and operation, clarify the operation procedures and give further training to the staff. This work presents the above mentioned issues. (author) 2 figs.

  19. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  20. Steam generator operation and maintenance

    International Nuclear Information System (INIS)

    Lee, C.K.

    2004-01-01

    Corrosion of steam generator tube has resulted in the need for extensive repair and replacement of steam generators. Over the past two decades, steam generator problems in the United States were viewed to be one of the most significant contributor to lost generation in operating PWR plants. When the SGOG-I (Steam Generator Owners Groups) was formed in early 1977, denting was responsible for almost 90% of the tube plugging. By the end of 1982, this figure was reduced to less than 2%. During the existence of SGOG-II (from 1982 to 1986), IGA/SCC (lntergranular Attack/Stress Corrosion Cracking) in the tube sheet, primary side SCC, pitting, and fretting surfaced as the primary causes of tube degradation. Although significant process has been made with wastage and denting, the utilities experience shows that the percentage of reactors plugging tubes and the percentage of tubes being plugged each year has remained relatively constant. The diversity of the damage mechanisms means that no one solution is likely to resolve all problems. The task of maintaining steam generator integrity continues to be formidable and challenging. As the older problems were brought under control, many new problems emerged. SGOG-II (Steam Generator Owners Group program from 1982 to 1986) has focused on these problem areas such as tube stress corrosion cracking (SCC) and intergranular attack (IGA) in the open tube sheet crevice, primary side tube cracking, pitting in the lower span, and tube fretting in preheated section and anti-vibration bar (AVB) locations. Primary Water Stress Corrosion Cracking (PWSCC) in the tube to tubesheet roll transition has been a wide spread problem in the Recirculation Steam Generators (RSG) during this period. Although significant progress has been made in resolving this problem, considerable work still remains. One typical problem in the Once Through Steam Generator (OTSG) was the tube support plate broached hole fouling which affects the OTSG steam generating

  1. Survey of Operators Knowledge of Operation and Maintenance of ...

    African Journals Online (AJOL)

    Result showed that the machine failures encountered during operations were as a result of poor management, inadequate maintenance practices, and lack of spare parts, obsoleteness, overloading, careless operations and poor storage of machine after use. Recommendations were therefore given to improve the operation ...

  2. Maintenance Operations Degradation of Airfield Pavement Markings

    Science.gov (United States)

    2012-03-01

    DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED The views expressed in this article are those of the author and...DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED AFIT/GEM/ENV/12-M09 MAINTENANCE OPERATIONS DEGRADATION OF...placement, color, and style (Federal Aviation Adminstration (FAA), 2010). However, regulations and standards do not make good asset management plans

  3. Davis PV plant operation and maintenance manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  4. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  5. Experience in operation and maintenance of PWRs

    International Nuclear Information System (INIS)

    Broecker, H.; Schomer, E.

    1987-01-01

    At present there are 10 PWRs in operation, most of them built on turnkey basis by KWU. The availability of West German PWRs amounted to 84.7% on average for the period from 1982-86. The good operating results are attributable to the following: 1. Sophiticated design and layout of the plant with good accessibility to the primary system even during operation. 2. Reliable performance of plant and components as result of extensive quality assurance. 3. Well-organized and highly qualified operating personnel. 4. Inservice inspection and preventive maintenance. 5. Good information feedback system. (Liu)

  6. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  7. Maintenance Approaches for Different Production Methods

    Directory of Open Access Journals (Sweden)

    Mungani, Dzivhuluwani Simon

    2013-11-01

    Full Text Available Various production methods are used in industry to manufacture or produce a variety of products needed by industry and consumers. The nature of a product determines which production method is most suitable or cost-effective. A continuous process is typically used to produce large volumes of liquids or gases. Batch processing is often used for small volumes, such as pharmaceutical products. This paper discusses a research project to determine the relationship between maintenance approaches and production methods. A survey was done to determine to what extent three maintenance approaches reliability-centred maintenance (RCM, total productive maintenance (TPM, and business-centred maintenance (BCM are used for three different processing methods (continuous process, batch process, and a production line method.

  8. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  9. Artificial intelligence applications for operation and maintenance

    International Nuclear Information System (INIS)

    Itoh, M.; Tai, I.; Monta, K.; Sekimizu, K.

    1987-01-01

    A nuclear power plant as a typical man-machine system of the modern industry needs an efficient human window through which operators can observe every necessary detail of the plant for its safe and reliable operation. Much efforts have been devoted to the development of the computerized operator support systems (COSS). Recent development of artificial intelligence (AI) seems to offer new possibility to strengthen the performance of the COSS such as more powerful diagnosis and procedure synthesis and user friendly man-machine interfaces. From this point of view, a national project of Advanced Man-Machine System Development for Nuclear Power Plants has been carried out. Artificial intelligence application to nuclear power plant operation and maintenance is also selected as a major theme for the promotion of research and development on frontiers in the recently revised long term national program for development and utilization of nuclear energy in JAPAN

  10. The operational challenge of remote maintenance

    International Nuclear Information System (INIS)

    Forsythe, L.

    2015-01-01

    Full text of publication follows. With the declining supply of fossil fuels that are used in power stations today, and the ongoing concern over climate change, nuclear fusion is one of the most promising options for generating large amounts of carbon-free energy in the future. Fuel supplies for fusion will be available for millions of years, with 1 kg of fusion fuel providing the same amount of energy as 10 thousand tonnes of fossil fuel. Unlike conventional fission reactors, the radioactive waste produced from fusion is short-lived, and will be safe to dispose of conventionally within 100 years. Although fusion has the huge advantage of being a carbon free energy source, there are complexities when it comes to maintaining the machine. Due to the nature of the fusion reaction, the components within the area of the reactor vacuum vessel become radioactive, which requires maintenance and modifications to be conducted remotely to protect human operators. Remote maintenance is the use of manipulators to carry out tasks in challenging or hostile environments, which would otherwise cause harm to humans. Remote handling slave manipulators do the work of a human by mimicking the movements from a master robotic manipulator that is controlled by a human operator. This means that remote handling can be used in many other areas other too, such as space; fission power plants; sub-sea; and nuclear material handling or in adverse environments such as: low or high temperature; chemically contaminated; combustible and low oxygen environments. Remote maintenance requires specialist engineers to take into consideration many aspects normally taken for granted when carrying out a task manually. Constraints such as the space around us; viewing and lighting; the human body's dexterity and flexibility; the weight and centre of gravity of tools and components, and how we securely grip and handle them; and access to fixings and fastenings. All these are factors that require careful

  11. Operations and maintenance costs - Selected observations

    International Nuclear Information System (INIS)

    Kirk, M.W.

    1991-01-01

    The operations and maintenance (O and M) costs associated with nuclear power plants have been rising continuously over the past decade. The Nuclear Management and Resources Council (NUMARC) has undertaken an examination of this issue to determine what components of O and M costs are driven by regulatory activity. Observers from various perspectives within the nuclear industry have cited staffing, outages, training, and management structure among others as large contributors to O and M costs. NUMARC is currently analyzing utility cost data to isolate the regulatory components for further action

  12. Annual report on experimental operations and maintenance of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2004 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Ohashi, Hirofumi; Morisaki, Norihiro; Kato, Michio; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This is annual report on the experimental test operations and maintenances of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system in 2004 fiscal year. The improvement work of catalyst dust filter in combustion system was performed in May 2004, and the performance was confirmed. The sixth experimental test operation was performed from June to July 2004. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July to September 2004. The seventh experimental test operation was performed from October to December 2004 for chemical reaction shutdown test. From the results, a behavior of the helium-gas cooling system, consists of steam generator and radiator, during chemical reaction shutdown was confirmed. This report is summarized with the outline and the results of the test, maintenance works and inspections, and operation records in mentioned above. (author)

  13. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    Science.gov (United States)

    2017-02-03

    in turn enable testing of helicopter rotor blades. The Army has also made investments in logistics software at all of its depots. According to the...maintenance and repair of structural helicopter airframes and blades; advanced composite technologies; flight controls and control surfaces; and...level maintenance on a wide range of vehicles and other military assets, including helicopters , combat vehicles, ships, aircraft, engines, and software

  14. Maintenance in nuclear production power plants

    International Nuclear Information System (INIS)

    Lozano, J. M.

    2010-01-01

    This article highlights the importance and quality of maintenance in the complete phases of development, in a sector which has been often questioned by the public opinion, and that is always subject to national and international standards. The aim of maintenance is to guarantee the production of electric power in a reliable, safe, economic and friendly environmentally way, assuring a long-term production. (Author)

  15. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  16. NPP operation and maintenance with french-built NPPs

    International Nuclear Information System (INIS)

    Mira, J.J.

    1987-01-01

    In Frace, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by ELECTRICITE DE FRANCE on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EDF and FRAMATOME, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly to those of FRAMATOME-built units

  17. ELECTRIC MOTORS MAINTENANCE PLANNING FROM ITS OPERATING VARIABLES

    Directory of Open Access Journals (Sweden)

    Francisco RODRIGUES

    2017-07-01

    Full Text Available The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, conse-quently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algo-rithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface, including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition data, also including the communication protocols among different logical applications.

  18. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  19. Operation and maintenance in Genkai PWR Plant

    International Nuclear Information System (INIS)

    Ohta, Shojiro

    1984-01-01

    The No.1 PWR plant with 559 MW capacity in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc., required about 115 days for the regular inspection in fiscal 1982 and thereafter, although more maintenance work was done. But No.2 plant of the same type required not more than 80 days. In most cases, the period of one operation cycle was from 10 to 12 months, but in the third operation cycle of No.2 plant, it is expected to be 13 months. The capacity ratio of the whole power station was 75.2% at the end of fiscal 1983. These operational records all exceeded the Japanese average. The plants are two-loop Westinghouse type PWRs, and No.1 plant started the commercial operation of anti h and the increment of P 0 + . (author) apacity ratio of No.1 plant was 71.6%, and that of No.2 plant was 85.5%. The intergranular attack on steam generator tubes was found first in the fifth regular inspection, and also in the sixth and seventh inspections, and the faulty tubes were plugged. The prevention of its spread is the largest problem. The in-service quality assurance activity, the personnel training program and the effort of upgrading the plant availability are reported. (Kako, I.)

  20. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    International Nuclear Information System (INIS)

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  1. Life Cycle Costs in Education: Operations & Maintenance Considered.

    Science.gov (United States)

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  2. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    Energy Technology Data Exchange (ETDEWEB)

    Whaley, Cass [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  3. TRUPACT-II Operating and Maintenance Instructions

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1

  4. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  5. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  6. Maintenance of electromechanical equipment in quality organization under operating conditions

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    The paper outlines the principles adopted by the Thermal Production Service of Electricite de France on the basis of the experience of the first years of operation of its 900 MW(e)PWR units for the purpose of improving quality organization in operating conditions in respect of the maintenance of electromechanical safety equipment. This organization is based on application of the usual principles for quality assurance, adapted in accordance with current French regulations. The paper first recalls the now traditional methods of applying the principles of quality organization in the area of equipment maintenance. It then defines particular so-called ''delicate'' activities which, in accordance with the above regulations, are subjected to additional quality organizational procedures; this applies in particular to the area of pre-maintenance preparation and studies and to the control exercised by the French safety authorities over the execution of those activities. The paper explains how the application of the regulations improves maintenance practices compared with standard quality organization. It describes how the attempt to establish a frontier between these two types of activity (current and ''delicate'') has led to the definition of a classification criterion which is technically correct and simple to use and is based on the professional skills of those performing each activity. The paper then describes in greater detail the principal rules for the performance of those tasks which come under the standard organization and those to which more stringent criteria apply. Lastly, it explains the thinking behind equipment surveillance programmes and the analysis of anomalies discovered through surveillance measures or brought to light by operating incidents, the aim of these being to benefit from the experience gained

  7. Annual report on experimental operations and maintenances of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2002 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Ohashi, Hirofumi; Inaba, Yoshitomo; Kato, Michio; Aita, Hideki; Morisaki, Norihiro; Takeda, Tetsuaki; Nishihara, Tetsuo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This report describes 2002 fiscal-year experimental test operations of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system. The improvement works were performed in May 2002. The second experimental test operation was performed from June 2002 and the performances of the improved parts were confirmed. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July 2002. The third experimental test operation was performed, from October 2002, for (a) start-up and shutdown test, (b) process change test, (c) chemical reaction shutdown test and (d) characteristics test on steam reformer. It was confirmed that the changes of helium gas temperature, caused at steam reformer, could be mitigated into the target range by the steam generator. Maintenance works of high-pressure gas production facilities were also performed in February 2003. This report is summarized with the outline and the results of the test, maintenance works and inspections, and operation records in mentioned above. (author)

  8. 24 CFR 1006.325 - Maintenance, management and efficient operation.

    Science.gov (United States)

    2010-04-01

    ... § 1006.325 Maintenance, management and efficient operation. (a) Written policies. The DHHL must develop... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maintenance, management and efficient operation. 1006.325 Section 1006.325 Housing and Urban Development Regulations Relating to Housing...

  9. 7 CFR 654.12 - Financing operations and maintenance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Financing operations and maintenance. 654.12 Section 654.12 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES... Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed to...

  10. 38th Annual Maintenance & Operations Cost Study for Colleges

    Science.gov (United States)

    Agron, Joe

    2009-01-01

    The nation's colleges are feeling the pinch of the economic downturn, and maintenance and operations (M&O) budgets especially are under pressure. This article presents data from the 38th annual Maintenance & Operations Cost Study for colleges that can help one in benchmarking expenditures at one's institution. Data provided only targets two-year…

  11. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2009-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  12. 38th Annual Maintenance & Operations Cost Study for Schools

    Science.gov (United States)

    Agron, Joe

    2009-01-01

    Despite the worst economic environment in generations, spending by K-12 institutions on maintenance and operations (M&O) held its own--defying historical trends that have shown M&O spending among the most affected in times of budget tightening. This article presents data from the 38th annual Maintenance & Operations Cost Study for…

  13. Gas characterization system operation, maintenance, and calibration plan

    International Nuclear Information System (INIS)

    Tate, D.D.

    1996-01-01

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations

  14. Multi-canister overpack operations and maintenance manual

    International Nuclear Information System (INIS)

    PIERCE, S.R.

    1999-01-01

    This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures

  15. Risk mitigation strategies for operations and maintenance activities.

    Science.gov (United States)

    2012-04-01

    The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...

  16. Total productive maintenance on example of automated foundry lines

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2009-07-01

    Full Text Available Within framework of the presented study one has performed analysis of stoppages in automatic foundry lines operation, and basing on assumptions from complex maintenance system has undertaken himself to develop a service maintenance schedule for machinery installed in the line. Moreover, one has presented general assumptions of TPM system operated in conditions of series and multi-series production of cast iron castings. One has constructed operational database and has elaborated a list of line stoppage causes within a year. One has proposed a possibility of implementation of manufacturing systems modeling and simulating technique in management of production machinery operation in a foundry shop. Within framework of the simulation experiment one has developed schedules of production, schedules of maintenance and has forecasted indices of general productivity of the machinery for a various scenarios of events on example of casting line having in-series structure of operational reliability. In course of the study there was implemented ARENA universal software package to modeling and simulation of the manufacturing systems.

  17. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  18. New Operation and Maintenance Contract for Electrical Network

    CERN Document Server

    Kowalik, G

    2001-01-01

    The Electrical Exploitation is one of the few remaining operation services at CERN which nearly entirely relies on the CERN staff. Last year CERN policy, in connection with the LHC project needs, have led to the formulation of the strategy of out-sourcing of the Electrical Exploitation activities, market survey and subsequent Invitation to Tender. The following paper presents the approach used in the preparation of the Invitation to Tender and in solving of the out-sourcing issues applied to the operation and maintenance of the CERN electrical network. In particular the problems of the results oriented contract, quality assurance and performance as well requirement of the constantly increasing productivity of the Contractors team are treated. The paper gives also the particularities of the application of the out-sourcing to the electrical operation service as will as techniques used for the estimation of the work load of the activities being outsourced.

  19. Optimal Maintenance of a Production System with Intermediate Buffers

    Directory of Open Access Journals (Sweden)

    Constantinos C. Karamatsoukis

    2012-01-01

    Full Text Available We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem of the optimal preventive maintenance of the installation if the installation deteriorates stochastically with usage and the production unit is always in operative condition. We also consider the problem of the optimal preventive maintenance of the production unit if the production unit deteriorates stochastically with usage and the installation is always in operative condition. Under a suitable cost structure and for given contents of the buffers, it is proved that the average-cost optimal policy for the first (second problem initiates a preventive maintenance of the installation (production unit if and only if the degree of deterioration of the installation (production unit exceeds some critical level. Numerical results are presented for both problems.

  20. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  1. 40 CFR 63.7335 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Science.gov (United States)

    2010-07-01

    ... corrective action is completed. (c) To demonstrate continuous compliance with the operation and maintenance... compliance with the operation and maintenance requirements that apply to me? 63.7335 Section 63.7335... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate...

  2. The impact of digitalization on Property Operations and Maintenance (O&M)

    OpenAIRE

    Garcia, Resty Gonzales

    2017-01-01

    The research topic of this master thesis is; “How can digitalization help increase productivity in property Operations and Maintenance (O&M)?” The research topic focuses on the challenges and opportunities in utilizing Computer Aided Facilities Management (CAFM) system regarding the operative function in Operations and Maintenance (O&M). The purpose of this research work is to analyze relevant literature and empirical data on how digitalization affects the O&M process and how the O&M ...

  3. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  4. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  5. Transport package maintenance requirements and operations

    International Nuclear Information System (INIS)

    Tyacke, M.J.; Ball, L.J.; Ayers, A.L. Jr.; Hayes, G.R.; Anselmo, A.A.

    1988-01-01

    The NuPac 125-B rail cask, which transports the damaged core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL), is the only new spent-fuel rail shipping cask to be licensed in the United States within the last decade. EG ampersand G Idaho, Inc. (EG ampersand G), acting on behalf of the US Department of Energy, is responsible for ensuring that those new casks and rail cars are properly maintained per regulatory requirements. Both the casks and rail cars have comprehensive in-service inspection and preventive maintenance programs, which are more involved than implied by the requirements. The TMI-2 shipping campaign is the most ambitious spent-fuel transport activity being conducted in the nuclear industry. The experience gained in this campaign, as it relates to maintenance of a transport system, should be of interest and have direct applicability to similar shipping activities planned in the years ahead

  6. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  7. 7 CFR 1767.27 - Operation and maintenance expenses.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS Uniform System of... Waterways 544Maintenance of Electric Plant 545Maintenance of Miscellaneous Hydraulic Plant Other Power....1Load Dispatch-Reliability 561.2Load Dispatch-Monitor and Operate Transmission System 561.3Load Dispatch...

  8. 49 CFR 236.919 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.919 Operations and Maintenance Manual. (a... identify all software versions, revisions, and revision dates. Plans must be legible and correct. (c...

  9. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and... software versions, revisions, and revision dates. Plans must be legible and correct. (c) Hardware, software...

  10. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... authorized persons. (3) FCC licensing requirements for operations and maintenance personnel. (4) Posting of..., with a maximum corrective maintenance time of not greater than 1.5 hours. This measure applies to... than 1,500 hours. This measure applies to unscheduled outages, out-of-tolerance conditions, and...

  11. Development techniques of total product maintenance

    International Nuclear Information System (INIS)

    Kim, S. D.; Oh, Y. W.; Soong, W. S.; Oh, W. H.

    2000-06-01

    Facilities should be maintained in solid operational condition and the time required for correcting the malfunctions should be minimized since the operational pause due to malfunctions would be one of the most influencing factors on the accomplishments of research goals. It is well-known that we are able to obtain about a 30% reduction of the disbursement through the scheduled pre-repairing processes and to minimize the duration of the malfunctions provided that the relevant factors were administered under systematic coordination. Hence, the development of the facility integrity management system is necessary in order to minimize the duration of the operational pause due to malfunctions with the least disbursement and to minimize the repair time, and also to maximize the efficiency of the budget execution, manpower organization and maintenance management

  12. Development techniques of total product maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. D.; Oh, Y. W.; Soong, W. S.; Oh, W. H

    2000-06-01

    Facilities should be maintained in solid operational condition and the time required for correcting the malfunctions should be minimized since the operational pause due to malfunctions would be one of the most influencing factors on the accomplishments of research goals. It is well-known that we are able to obtain about a 30% reduction of the disbursement through the scheduled pre-repairing processes and to minimize the duration of the malfunctions provided that the relevant factors were administered under systematic coordination. Hence, the development of the facility integrity management system is necessary in order to minimize the duration of the operational pause due to malfunctions with the least disbursement and to minimize the repair time, and also to maximize the efficiency of the budget execution, manpower organization and maintenance management.

  13. Operation and maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    1990-04-01

    The proceedings contain 34 papers, almost all discussing specific problems or the Dukovany nuclear power plant. The major part is devoted to the matters of maintenance, regular and unplanned repairs, decontamination of the steam generator for inspection and repair purposes, various methods of in-service diagnostics. Some papers discuss reactor start-up, safety assurance, unit control and economic aspects. Environmental impacts of the power plant are also tackled. Some special contributions concern corrosion, chemical analysis of the coolant and the diagnostics of electrical equipment. The possibility is discussed of switching WWER reactors to improved fuel cycles with increased fuel burnup. (M.D.). 37 figs., 23 tabs., 47 refs

  14. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  15. Annual report on experimental operations and maintenances of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2003 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Morisaki, Norihiro; Ohashi, Hirofumi; Kato, Michio; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This is a report on the experimental operations and maintenances of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system in 2003 fiscal year. The fourth and fifth experimental test operations were performed, from May to July and from October to December in 2003, for the following tests; (a) start-up and shutdown operation test, (b) process change test, (c) continuous hydrogen-production test and (d) chemical reaction shutdown test. From the results, a long time-range stability of the hydrogen production system was confirmed, a behavior of the helium-gas cooling system, consists of steam generator and radiator; during chemical reaction shutdown, was understood, and so on. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July 2003. This report is summarized on outlines and results of the tests, outlines and results of the periodic inspections, and operation records of the mock-up test facility. (author)

  16. Environmental management system for transportation maintenance operations : [technical brief].

    Science.gov (United States)

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  17. Constraints to private sector operation: maintenance of municipal infrastructure

    CSIR Research Space (South Africa)

    Wall, K

    2012-08-01

    Full Text Available This paper discusses the potential of the private sector to take medium- or longterm responsibility for the operation and/or maintenance of elements of infrastructure owned by municipalities....

  18. Franchising partnerships for roads engineering infrastructure operation and maintenance

    CSIR Research Space (South Africa)

    Wall, K

    2008-07-01

    Full Text Available This is a presentation delivered at the 27th SATC (Southern African Transport Conference) conference 2008, focusing on franchising principles and applying these principles to water services infrastructure, operation and maintenance...

  19. Innovative water service operation and maintenance: exploration of franchising partnerships

    CSIR Research Space (South Africa)

    Wall, K

    2008-10-01

    Full Text Available WRC and CSIR research has found that franchising partnerships could alleviate and address many challenges in the operation and maintenance of water services infrastructure. Franchising brings appropriate training to those on-site, and also offers...

  20. Maintenance and operations cost model for DSN subsystems

    Science.gov (United States)

    Burt, R. W.; Lesh, J. R.

    1977-01-01

    A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

  1. Communication links for fusion reactor maintenance operations

    International Nuclear Information System (INIS)

    Van Uffelen, M.

    2005-01-01

    Different architectures are envisaged for data transmission with fibre optic links in a radiation environment, as proposed in literature for both space and high energy physics applications. Their needs and constraints differ from those encountered for maintenance tasks in the future ITER environment, not only in terms of temperature and radiation levels, but also with respect to transmission speed requirements. Our approach attempts to limit the use of radiation-sensitive electronics for transmission of both digital and/or analogue data to the control room, using glass fibres as transport medium. We therefore assessed the radiation behaviour of a cost-effective fibre optic transmitter at 850 nm, consisting of a PWM (pulse width modulator), a radiation tolerant current driver (previously developed at SCK-CEN) and a VCSEL (Vertical-Cavity Surface Emitting Laser assembly, up to 10 MGy at 60 degrees Celsius. The PWM enables to transform an analogue sensor signal into a pseudo numerical signal, with a pulse width proportional to the incoming signal. The main objective of this task is to contribute to the major design of the maintenance equipment and strategy needed for the remote replacement of the divertor system in the future ITER fusion reactor, with particular attention to the implications of radiation hardening rules and recommendations. Next to the radiation assessment studies of remote handling tools, including actuators and sensors, we also develop radiation tolerant communication links with multiplexing capabilities

  2. Virtual reality technology in nuclear power plant operation and maintenance

    International Nuclear Information System (INIS)

    Chen Sen

    2005-01-01

    In this paper a generic virtual reality comprehensive system focusing on the operation and maintenance in Nuclear Power Plant (NPP) is proposed. Under this layout, some key topics and means of the system are discussed. As example 'Virtual Nuclear Island' comprehensive system and its typical applications in NPP are set up. In the end, it prospects the applications of virtual reality technology in NPP operation, training and maintenance. (author)

  3. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  4. Computerization of operation and maintenance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs.

  5. Operation and maintenance in the cooling and ventilation group

    OpenAIRE

    Bangert, N

    2003-01-01

    A core team of CERN staff is running the daily operations of the cooling and ventilation equipment at CERN, thus assuring multiple interfaces such as constant contact with the users of existing installations, the project leaders for new installations and intern-divisional communication. As support of this team, re-tendered contracts with external companies for the maintenance and operational tasks have been put into place multiple years ago. Higherlevel maintenance continues to be entrusted t...

  6. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  7. Computerization of operation and maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs

  8. Experiences on operation, maintenance and utilization in JRR-2

    International Nuclear Information System (INIS)

    1994-08-01

    The Japan Research Reactor No.2 (JRR-2) is a high performance 10 MW multi purpose research reactor, heavy water moderated and cooled enriched uranium fuel used. Since the first criticality was attained in October, 1960, JRR-2 has been operated to satisfy the utilization demands, such as irradiation of fuel and materials, neutron beam experiments, radio isotope production and B.N.C.T (Boron Neutron Capture Therapy). During the operation, various kinds of troubles mainly caused by the old design concept had been occurred at the JRR-2 systems and components. Those troubles were solved with adequate countermeasures of timely repairs and large scale modifications with newest techniques. The works above were completely carried out by the staff of JRR-2 and related divisions. As a result, JRR-2 became one of the oldest research reactors which are still under operation in the world. Since JRR-2 has been utilized for more than 30 years, the operation mode was changed from 12 days-one cycle to 3 days-one cycle in April, 1994, taking into consideration aging of the reactor systems. In this paper, the experiences of JRR-2 for more than 30 years such as operation, maintenance, repair, modifications and utilization on JRR-2 are described. (author)

  9. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  10. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  11. Functional Problems and Maintenance Operations of Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Liliana Topliceanu

    2016-02-01

    Full Text Available The exploitation in good conditions of the hydroelectric power plant imposes a rigorous maintenance of equipment and operating facilities, primarily of the turbine. The efficiency of the turbine is strongly affected by any defects which could occur during the operation. The paper makes a synthesis of the most frequent failures which have occurred during the functioning of Kaplan turbines plant and the required maintenance plan that has to be adopted. The maintenance rules for the optimal working of these turbines are also emphasized.

  12. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Weng, Dean [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  13. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Weng, Dean [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  14. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  15. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  16. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  17. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  18. Reliability analysis of maintenance operations for railway tracks

    International Nuclear Information System (INIS)

    Rhayma, N.; Bressolette, Ph.; Breul, P.; Fogli, M.; Saussine, G.

    2013-01-01

    Railway engineering is confronted with problems due to degradation of the railway network that requires important and costly maintenance work. However, because of the lack of knowledge on the geometrical and mechanical parameters of the track, it is difficult to optimize the maintenance management. In this context, this paper presents a new methodology to analyze the behavior of railway tracks. It combines new diagnostic devices which permit to obtain an important amount of data and thus to make statistics on the geometric and mechanical parameters and a non-intrusive stochastic approach which can be coupled with any mechanical model. Numerical results show the possibilities of this methodology for reliability analysis of different maintenance operations. In the future this approach will give important informations to railway managers to optimize maintenance operations using a reliability analysis

  19. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  20. Remote operation and maintenance support services for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Hiroki; Higuma, Koji; Shimizu, Shunichi; Sakuma, Masatake; Sonoda, Yukio; Kanemoto, Shigeru

    2004-01-01

    Toshiba Corporation constructed e-Toshiba Operating Plant Service (e-TOPS TM ) system and began remote operation and maintenance support service for nuclear power plants. The service put into practice remote operation and maintenance by harmony of information technologies such as internet and mobile, and nuclear power measurement/diagnostic technologies and security techniques. Outline of e-TOPS TM , remote-control service, -inspection system, -diagnostic service and technologies support service are explained. Construction, objects and application effects of e-TOPS TM , remote diagnostic system using image treatment techniques, construction of device record card control system are illustrated. (S.Y.)

  1. Human factors in operational maintenance on future naval vessels

    NARCIS (Netherlands)

    Post, W.M.; Schreurs, J.C.; Rakhorst-Oudendijk, M.L.W.; Badon Ghijben, N.A.; Diggelen, J. van

    2014-01-01

    The increasing complexity of operational maintenance on naval platforms and the need to sustain this also in battle conditions are in conflict with the requirement for crew reduction. This asks for a new approach. The Netherlands MoD knows how to develop technical solutions for operational

  2. 49 CFR 193.2713 - Training: operations and maintenance.

    Science.gov (United States)

    2010-10-01

    ... first-aid; and (3) All operating and appropriate supervisory personnel— (i) To understand detailed... 49 Transportation 3 2010-10-01 2010-10-01 false Training: operations and maintenance. 193.2713... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2713...

  3. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  4. Improvement of operation and maintenance management

    International Nuclear Information System (INIS)

    Hamazaki, Kazushige

    1986-01-01

    The organization for the operation management of nuclear power plants was established by Japanese utilities, and it was shown in the high capacity ratio of nuclear power plants that the establishment of the organization was of value. The utilities have made much effort with the cooperation of regulatory bodies and plant manufacturers so as to be able to ensure the safe, stable operation of nuclear power plants by overcoming various technical and social problems, in order to obtain public confidence. The education and training of the personnel concerned with nuclear power generation are much to do with the special condition of nuclear power development in Japan. The development and history of the education and training of nuclear power staffs in Japanese utilities are reviewed in three phases, initial 1967 ∼ 1971, the period of upgrading the management and the technical level of nuclear power stations 1972 ∼ 1980, and the period of firmly established nuclear power generation thereafter. The important basic policy of the management in Japanese utility companies, the characteristics of the in-house education of staffs based on the basic policy and the education and training of technical staffs are reported. (Kako, I.)

  5. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  6. Operation and maintenance manual for data acquisition system of MIDAS

    International Nuclear Information System (INIS)

    Lee, D. Y.; Park, W. M.; Kim, J. T.; Euh, D. J.

    2001-09-01

    This report describes an operation and maintenance manual of the data acquisition system and the data processing system for the DVI performance evaluation facility, MIDAS. The data acquisition system is implemented with VXI based system of Kinetic Systems TM , and the data processing PC. This report presents the configuration method and operation procedure for the operator. The modification procedure and method for functional extension and performance modification are also included for the future demand

  7. Integration of plant life management in operation and maintenance

    International Nuclear Information System (INIS)

    Hutin, Jean-Pierre

    2002-01-01

    people is an important feature of EDF strategy. Because operating experience often brings evidences of phenomenon which may impact component lifetime, EDF developed a powerful experience feedback organisation. Other key points of lifetime management process are described: Long term repair/replacement strategies Because of the high level of standardization of the EDF fleet, it is absolutely necessary to eliminate the risk of a generic problem which would affect all units at once. For that, EDF must have a very prospective view of all major degradations which could impair component reliability or integrity with appropriate repair/replacement strategies; Collecting relevant data When assessing plant lifetime expectancy, past data about operation and maintenance are needed. Typical examples are the bookkeeping of operating transients which may affect fatigue life of primary system components or the recording of component reliability data; Surveying industrial capacities In the next years, there is a risk for some 'nuclear' companies to go out of business so that EDF could have difficulties in finding appropriate support. To cope with this issue, EDF set up a 'world industrial capacity observatory' which permanently surveys international situation and try to identify 'product/company' pairs which are 'critical' and 'sensitive'. 4 - THE TEN YEAR REVIEW PROCESS. Before the first ten-year outage of a series, a new set of safety references is defined with Safety Authorities. All component/system/structure situations and operating conditions are reviewed, taking in account experience feedback. The results of these reviews are compared with references and a modification and upgrading program is defined. During ten-year outages, modifications are implemented. Extensive inspections and maintenance works are performed, including a set of anticipatory measures. A specific investigation program is also implemented to look for unexpected ageing phenomenon. 5 - THE PLANT LIFE MANAGEMENT

  8. Remote maintenance of an operational fusion experiment

    Energy Technology Data Exchange (ETDEWEB)

    Kiptily, V.G.; Jarvis, O.N.; Popovichev, S. [Euratom/UKAEA Fusion Assoc., Culham Science Centre, Abingdon, Oxon. (United Kingdom)] [and others

    2001-07-01

    Optimisation of auxiliary plasma heating by means of Ion Cyclotron Radio-Frequency (ICRF) and Neutral Beam Injection (NBI) as envisaged for the future fusion reactors is one of the main priorities in present research at today's tokamaks. Therefore, investigation of the production of fast ions during heating and of the subsequent fast ion behaviour in magnetically confined plasmas, together with an evaluation of the resulting bulk ion heating efficiency, are of essential importance for fusion reactor development. Gamma-ray diagnostics, based on the measurement of the gamma-ray emission from nuclear reactions between fast ions and the main plasma impurities, is a valuable technique for studying the fast particle energy distributions. Gamma-ray spectrometry provides information on the energy distribution, and the measurement of emission profiles supplies information on the spatial distribution of the reaction sites. Since 1987, the {gamma}-ray emission from JET plasmas has been systematically monitored and used successfully in the analysis of heating effects during ICRF and NBI heating in the JET tokamak. The classical character of the fast ion slowing down behaviour has been demonstrated and estimates have been obtained of the fast particle confinement time. The study of sawtooth crashes has demonstrated dramatic spatial redistribution of fast particles and other effects. In recent JET experiments to study the ITER-relevant ICRH scenarios ({sup 3}He)D and ({sup 3}He){sup 4}He, {gamma}-ray measurements provided information on the fast ion population, with the effective temperature of the energetic tail ions being deduced with the help of a {gamma}-ray spectrum simulation code, GAMMOD. In this paper, the main y-ray results are presented and the capabilities of gamma diagnostics are discussed in the light of the ITER-project programme.

  9. State of technology, system and solution supporting on-line maintenance - company's activities and products

    International Nuclear Information System (INIS)

    Nishitani, Junichi; Shimizu, Shunichi; Higasa, Hisakazu

    2010-01-01

    The new inspection system based on operator's maintenance and monitoring program of nuclear power plants was introduced in Japan more than one year ago and recommended on-line maintenance (maintenance during operation) will be carried out to increase capacity factor with safe and reliable operation of the plant. In this feature article, nine experts described the state of technology, system and solution supporting on-line maintenance - company's activities and products. These were titled as 'MHI's technology supporting on-line maintenance'. 'Technology supporting on-line maintenance - Toshiba's activities to upgrade monitoring and diagnostic service and maintenance management', 'AsahiKASEI's activities of on-line maintenance', 'Importance of information sharing of on-line maintenance and its ideal method-function of impact plan of IBM Maximo Asset Management for Nuclear', 'US's on-line maintenance and information systems', 'SmartProcedures realizing safe operation of nuclear power plant - proposal of computerized procedures', 'Ultrasonic leak detection system SDT170', 'Application of infrared thermography for equipment maintenance in nuclear power plant' and 'On-line condition monitoring system - condition eye'. (T. Tanaka)

  10. Optimisation of distributed maintenance: Modelling and application to the multi-factory production

    Energy Technology Data Exchange (ETDEWEB)

    Simeu-Abazi, Zineb, E-mail: Zineb.Simeu-Abazi@g-scop.inpg.fr [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France); Ahmad, Alali Alhouaij [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France)

    2011-11-15

    This paper concerns the modelling and the cost evaluation of maintenance activities in a distributed context. In this work we study the particular case where the maintenance activities are executed by two workshops: a central maintenance workshop (CMW) and a mobile maintenance workshop (MMW). The CMW concerns the repairing process for the corrective maintenance and the MMW executes all preventive maintenance in several factories according to a defined scheduling. The aim is to take into account the resources (spare parts in the MMW) and maintenance actions for a given operating budget. A modular approach for modelling a multi-site structure is proposed to achieve the aim of improving the availability of facilities on production sites while minimising the cost of maintenance.

  11. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  12. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  13. Design of casks: incorporating operational feedback from maintenance

    International Nuclear Information System (INIS)

    Bimet, F.; Hartenstein, M.

    2004-01-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible

  14. Ethernet Operation Administration and Maintenance ; Opportunities for the NREN community

    NARCIS (Netherlands)

    Prins, M.J.; Malhotra, R.

    2011-01-01

    Ethernet started its life as a Local Area Network technology and initially did not have Operations, Administration and Maintenance (OAM) features like IP Ping, IP Traceroute and SDH Loss of Frame. Monitoring and management was mainly done on the IP level. In the case of delivery of Ethernet

  15. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  16. Operations and Maintenance Manual, Atmospheric Contaminant Sensor, Revision B.

    Science.gov (United States)

    National Aeronautics and Space Administration, Washington, DC.

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams…

  17. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  18. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  19. Maintenance, repair and operation (MRO) of shutdown facilities

    International Nuclear Information System (INIS)

    Kenny, S.

    2006-01-01

    What level of maintenance does one apply to a shutdown facility? Well it depends on who you ask. Operations staff sees facilities that have completed their useful life cycle as a cost drain while Decommissioning staff sees this as the start of a new life cycle. Based on the decommissioning plan for the particular facility the building could complete another full life cycle while under decommissioning whether it is in storage with surveillance mode or under active decommissioning. This paper will explore how you maintain a facility and systems for many years after its useful life until final decommissioning is completed. When a building is declared redundant, who looks after it until the final decommissioning end state is achieved? At the AECL, Chalk River Labs site the safe shutdown and turnover process is one key element that initiates the decommissioning process. The real trick is orchestrating maintenance, repair and operation plans for a facility that has been poorly invested in during its last years of useful life cycle. To add to that usually shutdowns are prolonged for many years beyond the expected turnover period. During this presentation I will cover what AECL is doing to ensure that the facilities are maintained in a proper state until final decommissioning can be completed. All facilities or systems travel through the same life cycle, design, construction, commissioning, operation, shutdown and demolition. As we all know, nuclear facilities add one more interesting twist to this life cycle called Decommissioning that lands between shutdown and demolition. As a facility nears the shutdown phase, operations staff loose interest in the facility and stop investing in upgrades, repairs and maintenance but continue to invest and focus on maximizing operations. Facility maintenance standards produced by the International Facility Maintenance Association (IFMA) based on a survey done every year state that 2.2% of the total operating costs for the site should be

  20. Advances in new WWER designs to improve operation and maintenance

    International Nuclear Information System (INIS)

    Dragunov, Y.G.; Ryzhov, S.B.; Podshibiakin, A.K.; Vasilchenko, I.N.; Repin, A.I.; Nikitenko, M.P.; Konoplev, N.P.; Fil, N.S.

    2000-01-01

    Economic operational indices of WWER-type reactors show their competitiveness in all the countries where these reactors operate. Advanced WWERs being designed and constructed now have the improved characteristics of economical efficiency and are more convenient for operation and maintenance. Many technical solutions aimed at improvement of the operational performance are implemented in the design of WWER-1000/V-392 and WWER-640/V-407, and these reactors are the important basis for the nuclear power expansion in Russia. Some of these solutions are considered in the present paper. (author)

  1. Maintenance Issues in Long Term Operation of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Contri, P.; Bieth, M.; Rieg, C.

    2006-01-01

    Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLEX (Plant Life Extension) of their older nuclear facilities. This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. The review of regular maintenance and ageing management programs are tools widely used in LTO/PLEX context in many Countries. However, most of these tools are rather general and in many cases they need reshaping in an LTO/PLEX framework before application, with focus to the safety implications of the LTO/PLEX. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLEX programs. In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLEX, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLEX, among the other programs running at NPPs. In this sense, it is spin-off of the SENUF WG on maintenance. The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and safety review. The paper includes an analysis of the questionnaire circulated among the SENUF participants and a discussion on the implications of optimised maintenance programs in existing plants. Some examples at WWER plants taken by sources other than

  2. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  3. Standard hydrogen monitoring system-B operation and maintenance manual

    International Nuclear Information System (INIS)

    Bender, R.M.

    1995-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents

  4. 40 CFR 63.1447 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... corrective action according to written procedures specified in your operation and maintenance plan to... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my operation and maintenance... Maintenance Requirements § 63.1447 What are my operation and maintenance requirements? (a) As required by § 63...

  5. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ...-term maintenance. (3) Corrective action for all baghouses applied to pushing emissions. In the event a... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my operation and maintenance... Battery Stacks Operation and Maintenance Requirements § 63.7300 What are my operation and maintenance...

  6. Standard Hydrogen Monitoring System-D operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  7. Standard hydrogen monitoring system - E operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  8. Maintenance planning for a deteriorating production process

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Fouladirad, Mitra

    2017-01-01

    We consider a system subject to degradation, more precisely a production process with three quality states evolving according to a homogeneous Markov process. The degradation decreases the income generated by the system. To maintain revenue stream and prevent the loss of revenue, the system is inspected according to a Markov-modulated Poisson process. It is assumed that each inspection at time t incurs a time dependent cost. Each inspection improves the system health and therefore the degradation level jumps to a less deteriorated state. In absence of inspections, the system state is prone to shift to a more deteriorated state with a constant rate. The problem is to determine an optimal operating (stopping) time which truly balances some flow of income and increasing costs due to inspections, and so maximizes the expected gain of the proposed policy. To demonstrate the applicability of the explored approach and its effectiveness, some numerical results are provided. - Highlights: • An integrated model based on a quality state-dependent reward structure is explored. • The model allows the revenue stream responds to variation in the quality state. • The production process is inspected according to a Markovmodulated Poisson process. • Assuming a Markovian structure, we predict the quality state behavior. • We determine an optimal production run length based on a stopping decision rule.

  9. Heuristics for the Economic Production Quantity Problem under Restrictions on Production and Maintenance Time

    Directory of Open Access Journals (Sweden)

    Qi Xu

    2016-01-01

    Full Text Available This paper proposes an economic production quantity problem with the maximal production run time and minimal preventive maintenance time over a finite planning horizon. The objective is to find the efficient production and maintenance policy to minimize the total cost composed of production, maintenance, shortages, and holding costs under the restriction on the production run time and the preventive maintenance time. The production and maintenance decisions include the production and maintenance frequencies and the production run and the maintenance time. The variability and the boundedness of the production run and maintenance time make the problem difficult to solve. Two heuristic algorithms are developed using different techniques based on the optimal properties of the relaxed problem. The performance comparison between the two algorithms is illustrated by numerical examples. The numerical results show that, for the most part, there exists a heuristic algorithm which is more effective than the other.

  10. Impact of improved operation and maintenance on cohesive sediment transport in Gezira Scheme, Sudan

    NARCIS (Netherlands)

    Osman, I.S.E.

    2015-01-01

    Summary

    Efficient operation and maintenance of irrigation schemes are needed for improving the hydraulic performance of the canals, enhancing the crop yields and insuring sustainable production. There is a great need to enhance the researches and for a variety of tools such as

  11. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  12. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  13. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  14. New Trends in the Outsourcing of Maintenance/Operation Services

    CERN Document Server

    Wilhelmsson, M

    2001-01-01

    The contracting-experience of maintenance/operation work in our group can today be considered as rich with the first generation of contract implemented more than 15 years ago. The incumbent contract was started in 1997, so it is now into its 4th year. Certain improvements that have already been implemented has had a large impact on our contract culture e.g. performance indicators. The next re-tendering is now approaching and with this borne in mind, the author will discuss through various sections of this report the following main points: firstly, an overview of the trends today in this area; secondly, comparing these trends with implemented practices; and finally, what can be future development in the outsourcing of the maintenance/operation of the Cooling & Ventilation services.

  15. Kaunas gas, Lithuania. Operation and maintenance report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The main objective of this project was to transfer knowledge accumulated in Denmark about modern techniques of natural gas distribution to employees of the Lithuanian gas sector by informing them about modern measuring equipment and evaluating the results. The main objectives were: To improve the efficiency of maintenance and repair works of the distribution network in Kaunas; To decrease the number of leakages and to improve the operation of the cathodic protection system; To ensure protection of the pipelines and to avoid damages on other constructions and installations. The project consisted of four components which will all exert an influence on the future rehabilitation of steel pipe networks in the gas sector of Lithuania. The components were the following: Preparation of Operation and Maintenance Manual for Kaunas Gas Company; Cathodic measuring and pilot investigation; Analysis and improvement of the organisation of the Kaunas Gas Company; Training material for cathodic protection in Lithaunia. (au)

  16. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  17. Automatic and manual operation modes of the TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Boehme, G.; Gumb, L.; Lotz, E.; Mueller, G.; Selig, M.

    1987-01-01

    The remote in-vessel operations scheduled to maintain the TFTR at Princeton, NJ, USA, comprise inspection, calibration, cleaning and protective tile replacement. The environmental conditions inside the torus vessel are ultra high vacuum, moderate γ-radiation and 150 0 C temperature of the vessel structure. The Princeton Plasma Physics Laboratory (PPPL) and KfK are jointly developing a maintenance manipulator (MM) which can perform these tasks. (orig./HP)

  18. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    Science.gov (United States)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  19. Use of passive systems to improve plant operation and maintenance

    International Nuclear Information System (INIS)

    Shah, D.

    2000-01-01

    In a deregulated future, a utility's strength will depend on its ability to be cost competitive in the marketplace. However, the competitive advantage of nuclear power will depend on each owner's ability to reduce Operating and Maintenance (O and M) costs without sacrificing nuclear safety. The use of passive systems (i.e., systems without any moving parts) can reduce plant O and M costs while increasing safety in nuclear power plants. (author)

  20. Operation and maintenance techniques of cranes and Hoist in IMEF

    International Nuclear Information System (INIS)

    Soong, Woong Sup; Oh, Yon Woo; Ahn, Sang Bock; Park, Dae Gue; Whang, Ryoung Wha

    1999-07-01

    Crane and hoist of 11 sets are installed int the Irradiated Material Examination Facility (IMEF). IMEF is divided into two parts such as hot cell area and service area. 30/5-ton overhead crane is installed in service area for transfer of irradiated material transportation cask and other several kinds of heavy equipment. This report describes maintenance techniques, repair procedure, daily and special checking list, which will ensure safety in routine operation and even in abnormality. (author). 8 refs

  1. Operation and maintenance techniques of cranes and Hoist in IMEF

    Energy Technology Data Exchange (ETDEWEB)

    Soong, Woong Sup; Oh, Yon Woo; Ahn, Sang Bock; Park, Dae Gue; Whang, Ryoung Wha

    1999-07-01

    Crane and hoist of 11 sets are installed int the Irradiated Material Examination Facility (IMEF). IMEF is divided into two parts such as hot cell area and service area. 30/5-ton overhead crane is installed in service area for transfer of irradiated material transportation cask and other several kinds of heavy equipment. This report describes maintenance techniques, repair procedure, daily and special checking list, which will ensure safety in routine operation and even in abnormality. (author). 8 refs.

  2. Identifying Human Factors Issues in Aircraft Maintenance Operations

    Science.gov (United States)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  3. SUMO: operation and maintenance management web tool for astronomical observatories

    Science.gov (United States)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  4. RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System

    Science.gov (United States)

    Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.

    2008-08-01

    RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.

  5. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  6. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  7. Tobacco Products Production and Operations Reports

    Data.gov (United States)

    Department of the Treasury — Monthly statistical reports on tobacco products production and operations. Data for Tobacco Statistical Release is derived directly from the Report – Manufacturer of...

  8. Improvement of nuclear power plant operation and maintenance in Japan

    International Nuclear Information System (INIS)

    Kazushige Hamazaki

    1987-01-01

    Following the inauguration of commercial nuclear power generation in Japan in 1966, capacity factors were held in the relatively low level until around 1975 due to initial-period troubles. With subsequent improvement, however, capacity factors have climbed steadily and recently been sustaining more than 70%. To obtain this successful result, a various kind of improvement have been made not only for the operation management area but also for the maintenance management area in conjunction with the successive effort to reflect the operating experiences to the early stage design. Nowadays nuclear generation has assumed increasing importance for Japan's electrical power needs, and is making a great contribution to stabilizing power supply costs. (author)

  9. Optimization of radiation protection of cell maintenance of radiopharmaceutical production

    International Nuclear Information System (INIS)

    Machado, Jessica S.; Gerulis, Eduardo; Todo, Alberto S.; Rodrigues Junior, Orlando

    2011-01-01

    This paper performs a study of maintenance tasks realized in production cells to suggest improvements related to the occupational doses based on the optimization principle of the radioprotection. A data survey has been realized of the doses received by the workers during the maintenance. The average values of effective doses are lower than the limits established in the regulations, however can be optimized

  10. Integrated preventive maintenance and production decisions for imperfect processes

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Nahas, Nabil; Ben-Daya, Mohamed

    2016-01-01

    This paper integrates production, maintenance, and quality for an imperfect process in a multi-period multi-product capacitated lot-sizing context. The production system is modeled as an imperfect machine, whose the status is considered to be either in-control or out-of-control. When the machine is out of control, it produces a fraction of nonconforming items. During each period, this machine is inspected and imperfect preventive maintenance activities are simultaneously performed to reduce its age, proportional to the preventive maintenance level. The objective is to minimize the total cost, while satisfying the demand for all products. Our optimization model allows for a joint selection of the optimal values of production plan, and the maintenance policy, while taking into account quality related costs. A solution algorithm is developed and illustrative numerical examples are presented. It is found that the increase in PM level leads to reductions in quality control costs. Furthermore, if the cost of performing PM is high to the point where it is not compensated for by reductions in the quality related costs, then performing PM is not justifiable. Finally, using non-periodic preventive maintenance with the possibility of different preventive maintenance levels may result in an improvement of the total cost. - Highlights: • We integrate production, maintenance, and quality. • We evaluate all the expected costs. • Our model allows for a joint selection of the optimal values. • A solution algorithm is developed. • Increasing PM level will decrease quality control costs.

  11. 40 CFR 63.9600 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... instructions for routine and long-term maintenance. (2) Corrective action procedures for bag leak detection... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What are my operation and maintenance... and Maintenance Requirements § 63.9600 What are my operation and maintenance requirements? (a) As...

  12. Object and operation supported maintenance for mining equipment

    Directory of Open Access Journals (Sweden)

    Walter Bartelmus

    2014-09-01

    Full Text Available The paper aroused in answer to discussion in Mining Magazine (MM September 2011 and July/August 2013. The paper shows that discussion given in the MM issue July/August 2013 does not fulfill expectations expressed in MM issue 2011. The presented paper is the review on maintenance that is based on condition monitoring as tool for detection of faults and failure prevention. Fault and failure are regarded as inevitable during the machine operation as the process of wear and the process of degradation. The question is, if one can influence the wear and degradation process, using condition monitoring. The paper will present technology (in reference to cited papers which demonstrates that the use of the proper method can influence the wear and machine degradation process, using proper condition monitoring techniques and knowing scenarios of wear and degradation process, the maintenance can be rationalized. The presented paper shows possible improvements which are needed to fulfill expectations expressed in MM September 2011 and they are not taken into consideration in MM July/August 3013. These improvements can be fulfilling on the bases of object and operation supported maintenance.

  13. Gulf operators resuming production

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports that Gulf of Mexico operators last week were gradually restoring production at installations struck by Hurricane Andrew. The Minerals Management Service continued receiving reports of more damage. By the end of the day Sept. 8, MMS had received reports of damage to 83 pipeline segments and 193 platforms and satellite installations. Damage reports listed 112 installations with structural damage, 13 platforms toppled and five leaning, and 30 satellite platforms toppled and 33 leaning. But despite the extent of damage the storm inflicted on oil and gas installations in the gulf, it pales in comparison to the misery and suffering the storm caused in Florida and Louisiana, an oil company official said

  14. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  15. Optimal Maintenance Crew Composition and Enhancement of Crew Productivity

    Science.gov (United States)

    2008-08-01

    The South Carolina Department of Transportation dedicates a large portion of both : its budget and other resources to the maintenance of the States transportation : infrastructure. In order to maximize the efficiency and productivity of the State...

  16. Ageing of reinforced concrete pipes subjected to seawater in nuclear plants: optimization of maintenance operations

    International Nuclear Information System (INIS)

    Auge, L.; Capra, B.; Lasne, M.; Benefice, P.; Comby, R.

    2007-01-01

    Seaside nuclear power plants have to face the ageing of nuclear reactor cooling piping systems. In order to minimize the duration of the production unit shutdown, maintenance operations have to be planned well in advance. In a context where owners of infrastructures tend to extend the life span of their goods while having to keep the safety level maximum, it is more and more important to develop high level expertise and know-how in management of infrastructures life cycle. A patented monitoring technique based on optic fiber sensors, has been designed. This preventive maintenance enables the owner to determine criteria for network replacement based on degradation impacts. A methodology to evaluate and optimize operation budgets, depending on predictions of future functional deterioration and available maintenance solutions, has been developed and applied. (authors)

  17. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  18. DOE-EM-45 Packaging Operations And Maintenance Course

    International Nuclear Information System (INIS)

    Watkins, R.; England, J.

    2010-01-01

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  19. How the Station will operate. [operation, management, and maintenance in space

    Science.gov (United States)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  20. Toward autonomous operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Kitamura, M.

    1994-01-01

    Issues toward realization of autonomous operation as well as maintenance of nuclear power plants are reviewed in this paper. First, the necessity and significance of the technical program aiming at the establishment of autonomous nuclear plant are discussed through reviewing the history and current status computerized operation of complex artifacts. Then, key technologies currently studied to meet the need within the framework of artificial intelligence (AI) and advanced robotics are described. Among such AI-technologies are distributed multi-agent system, operator thinking model, and advanced man-machine interface design. Advances in robot technology attained include active sensing technique and multi-unit autonomous maintenance robot systems. Techniques for simulation of human action have been pursued as basic issues for understanding mechanisms behind human behavior. In addition to the individual developments, methodological topics relevant to the autonomy of nuclear facilities are briefly addressed. The concepts called methodology diversity and dynamic functionality restoration (realization) are introduced and discussed as the underlining principles to be considered in the development of the autonomous nuclear power plants. (author)

  1. Hypertext-based integration for nuclear plant maintenance and operations

    International Nuclear Information System (INIS)

    Tsoukalas, L.H.; Upadhyaya, B.R.

    1991-01-01

    A methodology is presented that uses fuzzy graphs in the emerging paradigm of hypertext for the purpose of integrating data, information and multifaceted knowledge resources abounding in power plant operations and maintenance. A hypertext system is viewed as a set of nodes and links where with each link we associate membership functions embodying context-dependent criteria for navigating large information spaces. A general framework for navigation is outlined and graph-theory navigational tools are developed. A numerical example and a HyperCard-based prototype for monitoring special material in the MHTGR-NPR are included. 10 refs., 12 figs

  2. Operation and maintenance experience at the TRIGA Mainz reactor

    International Nuclear Information System (INIS)

    Menke, Helmut

    1976-01-01

    Oscillations observed in the linear power channel especially at low steady state power with the pulse-rod in down position were found to be due to wear of connections of the pulse-rod. The downstream water from the cooling system caused a swing of the rod, which in turn induced the power oscillations. The wear can be regarded as normal, as more than 10,000 pulses have been performed so far. The repairs of the rod assembly are described. No major problems in operation and maintenance of the TRIGA Mainz were met since 1974. Results of routine inspections as fuel element measurements, power calibrations, etc., are described and discussed. (author)

  3. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...

  4. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1203 Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall arrange for full funding for operation and maintenance of contract schools by fiscal year 1981. ...

  5. Robotics and automation for oil sands bitumen production and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lipsett, M.G. [Alberta Univ., Edmonton, AB (Canada). Dept. of Mechanical Engineering

    2008-07-01

    This presentation examined technical challenges and commercial challenges related to robotics and automation processes in the mining and oil sands industries. The oil sands industry has on-going cost pressures. Challenges include the depths to which miners must travel, as well as problems related to equipment reliability and safety. Surface mines must operate in all weather conditions with a variety of complex systems. Barriers for new technologies include high capital and operating expenses. It has also proven difficult to integrate new technologies within established mining practices. However, automation has the potential to improve mineral processing, production, and maintenance processes. Step changes can be placed in locations that are hazardous or inaccessible. Automated sizing, material, and ventilation systems are can also be implemented as well as tele-operated equipment. Prototypes currently being developed include advanced systems for cutting; rock bolting; loose rock detection systems; lump size estimation; unstructured environment sensing; environment modelling; and automatic task execution. Enabling technologies are now being developed for excavation, haulage, material handling systems, mining and reclamation methods, and integrated control and reliability. tabs., figs.

  6. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, Bernhard

    2008-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper

  7. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, B.

    2007-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development - Remote handling task logistics and resource management - Command, control and human-machine interface system - Viewing and camera systems - Virtual Reality and Augmented Reality software - Automatic path planning and collision avoidance - Remote transfer of heavy loads - Maintainability of RH Equipment - Reliability, redundant systems and safety - Rationalisation and modularity in both hardware and software - Recovery from failure modes - Condition monitoring and fault detection/prediction - Ability to deal with unforeseen problems Oxford Technologies Ltd has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET Remote Handling experience and the ITER Hot Cell design and layout are given throughout this paper. (orig.)

  8. Setting up and managing a remote maintenance operation for fusion

    Energy Technology Data Exchange (ETDEWEB)

    Haist, Bernhard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom)], E-mail: Bernhard.Haist@oxfordtechnologies.co.uk

    2008-12-15

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper.

  9. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  10. Feasibility study for a transportation operations system cask maintenance facility

    Energy Technology Data Exchange (ETDEWEB)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  11. Hydraulic screw fastening devices - design, maintenance, operational experience

    International Nuclear Information System (INIS)

    Lachner.

    1976-01-01

    With hydraulic screw fastening devices, pretension values with a maximum deviation of +-2.5% from the rated value can be achieved. This high degree of pretension accuracy is of considerable importance with regard to the safety factor required for the screw connection between reactor vessel head and reactor vessel. The operating rhythm of a nuclear power station with its refuelling art regular intervals makes further demands on the screw fastening device, in particular in connection with the transport of screws and for nuts. The necessary installations extend the screw fastening device into a combination of a high-pressure hydraulic cylinder system with an electrical or pneumoelectrical driving unit and an electrical control unit. Maintenance work is complicated by the large number of identical, highly stressed structural elements in connection with an unfavourable relation operating time/outage time. The problems have been perpetually reduced by close cooperation between the manufacturers and users of screw fastening devices. (orig./AK) [de

  12. Feasibility study for a transportation operations system cask maintenance facility

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs

  13. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  14. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  15. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  16. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  17. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    Science.gov (United States)

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  18. Guide for the monitoring of radiation protection during national modification and maintenance operations. Report nr 307

    International Nuclear Information System (INIS)

    Bataille, C.; Michelet, M.; Schieber, C.

    2010-02-01

    This methodological guide aims at helping the different involved actors in designing and implementing the monitoring of radiation protection during modification and maintenance operations performed at the national level. It describes actions to be performed by each actor in order to comply with the objectives of the four steps related to the radiation protection monitoring of an operation: the design of the radiation protection monitoring during the study phase, the adaptation of this monitoring to the concerned CNPE (electricity production nuclear centre), the radiation protection monitoring during the operation performance, and the analysis of the return on experience

  19. Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops

    Directory of Open Access Journals (Sweden)

    Mehmet Talha Dulman

    2018-01-01

    Full Text Available Sensors are commonly employed to monitor products during their life cycles and to remotely and continuously track their usage patterns. Installing sensors into products can help generate useful data related to the conditions of products and their components, and this information can subsequently be used to inform EOL decision-making. As such, embedded sensors can enhance the performance of EOL product processing operations. The information collected by the sensors can also be used to estimate and predict product failures, thereby helping to improve maintenance operations. This paper describes a study in which system maintenance and EOL processes were combined and closed-loop supply chain systems were constructed to analyze the financial contribution that sensors can make to these procedures by using discrete event simulation to model and compare regular systems and sensor-embedded systems. The factors that had an impact on the performance measures, such as disassembly cost, maintenance cost, inspection cost, sales revenues, and profitability, were determined and a design of experiments study was carried out. The experiment results were compared, and pairwise t-tests were executed. The results reveal that sensor-embedded systems are significantly superior to regular systems in terms of the identified performance measures.

  20. RTEMS Centre - Support and Maintenance Centre to RTEMS Operating System

    Science.gov (United States)

    Silva, H.; Constantino, A.; Freitas, D.; Coutinho, M.; Faustino, S.; Mota, M.; Colaço, P.; Sousa, J.; Dias, L.; Damjanovic, B.; Zulianello, M.; Rufino, J.

    2009-05-01

    RTEMS CENTRE - Support and Maintenance Centre to RTEMS Operating System is a joint ESA/Portuguese Task Force initiative to develop a support and maintenance centre to the Real-Time Executive for Multiprocessor Systems (RTEMS). This paper gives a high level visibility of the progress, the results obtained and the future work in the RTEMS CENTRE [6] and in the RTEMS Improvement [7] projects. RTEMS CENTRE started officially in November 2006, with the RTEMS 4.6.99.2 version. A full analysis of RTEMS operating system was produced. The architecture was analysed in terms of conceptual, organizational and operational concepts. The original objectives [1] of the centre were primarily to create and maintain technical expertise and competences in this RTOS, to develop a website to provide the European Space Community an entry point for obtaining support (http://rtemscentre.edisoft.pt), to design, develop, maintain and integrate some RTEMS support tools (Timeline Tool, Configuration and Management Tools), to maintain flight libraries and Board Support Packages, to develop a strong relationship with the World RTEMS Community and finally to produce some considerations in ARINC-653, DO-178B and ECSS E-40 standards. RTEMS Improvement is the continuation of the RTEMS CENTRE. Currently the RTEMS, version 4.8.0, is being facilitated for a future qualification. In this work, the validation material is being produced following the Galileo Software Standards Development Assurance Level B [5]. RTEMS is being completely tested, errors analysed, dead and deactivated code removed and tests produced to achieve 100% statement and decision coverage of source code [2]. The SW to exploit the LEON Memory Management Unit (MMU) hardware will be also added. A brief description of the expected implementations will be given.

  1. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  2. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  3. Marginal costs for road maintenance and operation - a cost function approach

    OpenAIRE

    Haraldsson, Mattias

    2007-01-01

    Using observational data covering the whole Swedish national road network for the period 1998-2002, this paper estimates a set of maintenance and operation cost functions. It is found that costs for all operation and maintenance measures increase with traffic intensity, with two exceptions; total operation and winter operation measures are fixed cost activities. All other operation and maintenance measures have short run elasticities in the range 0.25-0.60. The impact of an additional vehicle...

  4. Organization and mechanization of maintenance operations at NPPs with the WWER type reactors

    International Nuclear Information System (INIS)

    Titov, A.A.

    1983-01-01

    The structure of capital investments defining organization and mechanization of maintepance operations at NPPs with the WWER type reactors is analyzed. The trends in development of optimum decisions for organization and mechanization of repair obs at NPPs being designed taking into account the prospects of nuclear powep enginerning development, the system of NPP maintenance servicing, as well as the structure of repair-productive capacities are discussed. On the basis of the analysis of the data obtained in designing the Zaporozhskaya NPP it is shown that the capital investments for organizing and mechanization of maintenance operations at the unified NPP site with four WWER-1000 reactors reach nearly 18 roubles/kW. A conclusion is drawn that at present the design of an NPP with the WWER-1000 reactor totally meets the requirements of realization of periodic maintenance operations. It is advisable to cooperate the NPP management with that of a thermal power station from the viewpoint of using manpower, which would improve the operating conditions and labour productivity of workers engaged in repair and, consequently, reduce the capital investments and repair expenditures

  5. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-01

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  6. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    Science.gov (United States)

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  7. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  8. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  9. Method and computer program product for maintenance and modernization backlogging

    Science.gov (United States)

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  10. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  11. EN-CV during LS1: upgrade, consolidation, maintenance, operation

    International Nuclear Information System (INIS)

    Nonis, M.

    2012-01-01

    The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a time-frame limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Among these projects we find: the PM32 raising pumps, the cooling of the CERN Control Center, R2E, the backup cooling towers for ATLAS and cryogenics, a thermosyphon for ATLAS, or new pumps in UWs. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group

  12. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  13. Umatilla hatchery satellite facilities operation and maintenance. Annual report 1996

    International Nuclear Information System (INIS)

    Rowan, G.D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996

  14. Extending Virtual Reality simulation of ITER maintenance operations with dynamic effects

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Baar, M.R. de; Boessenkool, H.; Graafland, B.; Haye, M.J.; Koning, J.F.; Vahedi, M.; Visser, M.

    2011-01-01

    Virtual Reality (VR) simulation can be used to study, improve and verify ITER maintenance operations during preparation. VR can also improve the situational awareness of human operators during actual Remote Handling (RH) operations. Until now, VR systems use geometric models of the environment and the objects being handled and kinematic models of the manipulation systems. The addition of dynamic effects into the VR simulation was investigated. Important dynamic effects are forces due to contact transitions and the bending of beams under heavy loads. A novel dynamics simulation module was developed and introduced as an add-on to the VR4Robots VR software. Tests were performed under simplified test conditions and in the context of realistic ITER maintenance tasks on a benchmark product and on the ECRH Upper Port Launcher Plug (UPL). The introduction of dynamic effects into VR simulations was found to add realism and provide new insights in procedure development. The quality of the haptic feedback depends strongly on the haptic device used to 'display' haptic feedback to the operator. Dynamic effect simulation can also form the basis for real-time guidance support to operators during the execution of maintenance tasks (augmented reality).

  15. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  16. Operation and maintenance cost data for residential photovoltaic modules/panels

    Science.gov (United States)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  17. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  18. Waste minimization, recycling and reuse in operations support services fleet maintenance

    International Nuclear Information System (INIS)

    Trego, A.L.

    1994-01-01

    Government regulations and smart business practices demand that organizations dramatically reduce both the type and volume of waste generated by their operations. This article describes successful waste minimization and recycling programs created by the Fleet Maintenance, Operations Support Services Division, Westinghouse Hanford Company. These comprehensive programs have greatly reduced waste formerly produced in maintaining 3,528 government-owned vehicles and nearly 200 emergency power generators at the Hanford Site. The actions are integral to preventing future contamination of the Site as well as to cleaning up the complexity of wastes from almost 50 years of defense production. The results of the Fleet Maintenance programs are impressive, recording cost savings of $290,000 in fiscal year 1993 and $965,000 since 1988

  19. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  20. Considerations on operation schedule and maintenance aspects of FCC-hh

    CERN Document Server

    Niemi, Arto; Foraz, Katy

    2018-01-01

    The Future Circular Hadron Collider (FCC-hh) has ambitious goals for integrated luminosity production. Reaching these goals requires reducing the time for planned technical stops and commissioning, compared to the LHC. This note describes potential options for an FCC-hh operation schedule. Special attention is given to considerations on how to accomplish the required maintenance activities in a limited time frame. The note recommends to study further the feasibility and cost-efficiency of operating without annual stops and longer intervals between long shutdowns.

  1. Operating and maintenance experience of Dhruva secondary shutdown system

    International Nuclear Information System (INIS)

    Sharma, U.L.; Bharathan, R.

    1997-01-01

    Nine numbers of cadmium shut-off rods are used as primary fast acting shutdown devices while moderator dumping is used as secondary shutdown system. The secondary shutdown system in Dhruva reactor comprises of 3 dump valves and 3 control valves. Under normal operations, the control valves are used to control the moderator level and thereby the reactor power. Under Trip conditions the dump valves as well as the control valves open fully, dumping the moderator to the dump tank, thereby acting as secondary shutdown devices. While the failure of any of these valves to close fully is an incident, the failure of any of these valves to open on a demand is a safety related unusual occurrence and needs to be viewed seriously. During the last 11 years of operation of these valves, there was one incidence of a valve not closing fully and there were two instances of a valve not opening fully on demand. The possible causes, the corrective action taken to rehabilitate these valves and the elaborate system preparations undertaken to enable maintenance jobs are described. (author)

  2. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  3. Criterion III: Maintenance of rangeland productive capacity [Chapter 4

    Science.gov (United States)

    G. R. Evans; R. A. Washmgton-Allen; R. D. Child; J. E. Mitchell; B. R. Bobowskl; R. V. Loper; B. H. Allen-Diaz; D. W. Thompson; G. R. Welling; T. B. Reuwsaat

    2010-01-01

    Maintenance of rangeland productive capacity is one of five criteria established by the Sustainable Rangelands Roundtable (SRR) to monitor and assess rangeland sustainable management. Within this criterion, six indicators were developed through the Delphi Process and the expert opinions of academicians, rangeland scientists, rangeland management agency personnel, non-...

  4. The impact of embedded total productive maintenance with six ...

    African Journals Online (AJOL)

    The purpose of the work presented in this paper is to capture the current state of Six Sigma and Total Productive Maintenance (TPM) as well as to propose the embedded approach of Six Sigma and TPM on improving supply chain performance. The approach to this paper is to answer the questions such as “how does TPM ...

  5. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  6. Cask operation and maintenance for spent fuel storage

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.S. [International Atomic Energy Agency, Vienna (Austria)

    2004-07-01

    Interim storage is an essential platform for any option to be chosen later as an endpoint for spent fuel management. In view of such a circumstance, the most imminent service required for the spent fuel management worldwide is to provide adequate storage for the future spent fuel inventory arising either from the continued operation of nuclear power plants or from the removal of spent fuel in preparation for plant decommissioning. While the bulk of the global inventory of spent fuel are still stored in AR pools, dry storage has become a prominent alternative especially for newly built AFR facilities, with more than 17,000 t HM already stored in dry storage facilities worldwide. Storage in cask under inert conditions has become the preferred option, given the advantages including passive cooling features and modular mode of capacity increase. In terms of economics, dry storage is particularly propitious for long-term storage in that operational costs are minimized by the passive cooling features. The trend toward dry storage, especially in cask type, is likely to continue with an implication that and the supply will closely follow the increasing demand for storage by incremental additions of casks to the effect of minimizing cost penalty of the idle capacities typical of pool facilities. A variety of storage systems have been developed to meet specific requirements of different reactor fuels and a large number of designs based on these generic technologies are now available for the spent fuel containers (horizontal, vertical etc) and storage facilities. Multi-purpose technologies (i.e. a single technology for storage, transportation and disposal) have also been studied. Recent concern on security measures for protection of spent fuel has prompted a consideration on the possibility of placing storage facility underground. The future evolution of requirements and technologies will bring important impacts on cask operation and maintenance for spent fuel storage.

  7. Cask operation and maintenance for spent fuel storage

    International Nuclear Information System (INIS)

    Lee, J.S.

    2004-01-01

    Interim storage is an essential platform for any option to be chosen later as an endpoint for spent fuel management. In view of such a circumstance, the most imminent service required for the spent fuel management worldwide is to provide adequate storage for the future spent fuel inventory arising either from the continued operation of nuclear power plants or from the removal of spent fuel in preparation for plant decommissioning. While the bulk of the global inventory of spent fuel are still stored in AR pools, dry storage has become a prominent alternative especially for newly built AFR facilities, with more than 17,000 t HM already stored in dry storage facilities worldwide. Storage in cask under inert conditions has become the preferred option, given the advantages including passive cooling features and modular mode of capacity increase. In terms of economics, dry storage is particularly propitious for long-term storage in that operational costs are minimized by the passive cooling features. The trend toward dry storage, especially in cask type, is likely to continue with an implication that and the supply will closely follow the increasing demand for storage by incremental additions of casks to the effect of minimizing cost penalty of the idle capacities typical of pool facilities. A variety of storage systems have been developed to meet specific requirements of different reactor fuels and a large number of designs based on these generic technologies are now available for the spent fuel containers (horizontal, vertical etc) and storage facilities. Multi-purpose technologies (i.e. a single technology for storage, transportation and disposal) have also been studied. Recent concern on security measures for protection of spent fuel has prompted a consideration on the possibility of placing storage facility underground. The future evolution of requirements and technologies will bring important impacts on cask operation and maintenance for spent fuel storage

  8. Economic implications of nuclear operating and maintenance costs

    International Nuclear Information System (INIS)

    Braun, C.

    1994-01-01

    Nuclear operating and maintenance (O and M) costs for U.S. plants have been increasing during the decade of the 1980's. Costs have stabilized over the last five years but have not yet significantly declined. Annual capacity factors have considerably improved during the last eight years and unit O and M costs expressed in Mills Kwh have thus declined. Two other important trends evident over the last five years have been the decline in fossil fuel prices and the transition to deregulated electric utilities market, accelerated with the passage of the 1992 Energy Policy Act. Within the next five years it may be possible for large scale industrial customers to directly contract with electricity generators, by they utilities or independent power producers (IPP's) for supplying their power requirements. The ability of such customers to directly contract with potential supplies based on low cost performance bypassing their local utility, may have significant implications for the structure of the utility industry in the near term and for plant operations. A greater pressure will likely be exerted on all plants, including nuclear to reduce operating costs so as to remain competitive with other power suppliers in their markets. Nuclear O and M costs are likely to be heavily scrutinized for possible savings and reductions. The electric utilities mergers waves and the nuclear industry's initiative on O and M cost control both aim at improving plant economics so as to better compete in the more deregulated environment. In this climate the issues of why nuclear O and M costs have increased, what can be done to reduce costs and what are the implications for advanced reactors design and economics are discussed. 14 figs

  9. User cognition in product operation

    NARCIS (Netherlands)

    Gelderblom, G.J.

    2001-01-01

    Daily a large number of everyday consumer products are being used. Unfortunately part of this usage is not successful. One of the causes of failure lies in the cognitive aspects of product use, users do not know how to operate the product or try to use it in a way which is not successful. Ideally,

  10. survey of operators kn and maintenance o in ebonyi st vey

    African Journals Online (AJOL)

    eobe

    o access the operators' knowledge of operation and maintenance of farm to access the operators' .... other factors hinder agricultural mechanization in Nigeria. Ebonyi State is an agrarian area, hence, the ... MATERIALS AND METHODS. 2.

  11. Product Operations Status Summary Metrics

    Science.gov (United States)

    Takagi, Atsuya; Toole, Nicholas

    2010-01-01

    The Product Operations Status Summary Metrics (POSSUM) computer program provides a readable view into the state of the Phoenix Operations Product Generation Subsystem (OPGS) data pipeline. POSSUM provides a user interface that can search the data store, collect product metadata, and display the results in an easily-readable layout. It was designed with flexibility in mind for support in future missions. Flexibility over various data store hierarchies is provided through the disk-searching facilities of Marsviewer. This is a proven program that has been in operational use since the first day of the Phoenix mission.

  12. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  13. 43 CFR 404.55 - Who is responsible for the operation, maintenance, and replacement costs?

    Science.gov (United States)

    2010-10-01

    ... Miscellaneous § 404.55 Who is responsible for the operation, maintenance, and replacement costs? You will be responsible for 100 percent of the operation, maintenance, and replacement costs for any rural water facility... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who is responsible for the operation...

  14. Augmented reality aided operation and maintenance system for indoor environments

    International Nuclear Information System (INIS)

    Tamura, Yuichi; Umetani, Tomohiro; Kubo, Shin

    2013-01-01

    This paper proposes an Augmented Reality (AR) system to assist operation and maintenance tasks in an indoor environment, such as a nuclear fusion reactor and its building. AR is a technology that enhances real information by adding 3D virtual objects, images, sounds, or movies via a web camera. The AR system often uses “markers” such as QR code to detect the place where the virtual content should appear. However, these markers are unnatural and they can disturb the scenery. We propose an AR system that can detect natural markers, which provides AR content via a network. This system stores the information related to markers and virtual objects on a server. A device connected to this system automatically downloads this content so that the user can watch the AR content via a web camera. We add a real-time numerical simulation function that allows us to simulate physical phenomena by touching AR contents. It also enables us to observe simulation results by downloading a movie of numerical simulation results from the simulation server. Overall, this system allows us to watch the same content with multiple devices and to simulate physical phenomena using various parameters. (author)

  15. Preventive Maintenance. FMO: Fundamentals of Machine Operation. Third Edition.

    Science.gov (United States)

    Hathaway, Louis

    This text is intended to provide students with basic information on conducting preventive maintenance on agricultural machinery. The following topics are covered in the individual chapters: the importance of preventive maintenance and recommended service intervals; engine intake and exhaust systems (air cleaners, turbochargers, intake and exhaust…

  16. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  17. Operation and maintenance of the RA reactor in 1964, I-II, Part I

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-12-01

    During 1964, the Reactor as operated about 20 days each months at nominal power of 6.5 MW, 5 days at lower power levels and 5 days were used for maintenance. Total production was 27930 MWh which is 11.7% higher than the planned value. Fuel exchange was done 3 times during this period, 98 spent fuel channels were exchanged. In addition to routine maintenance of reactor components and instruments a series of analyses of heavy water and helium were done. Special attention was devoted to corrosion analyses of the reactor materials because of the heavy water system was refurbished decontaminated in 1963. Utilization of the experimental space in the reactor was better that previously. 546 samples were irradiated till the end of November, of which 443 for users from the Institute. Specific irradiations in the fast neutron flux were done in six VISA-2 channels in the core

  18. On risk-based operation and maintenance of offshore wind turbine components

    International Nuclear Information System (INIS)

    Jessen Nielsen, Jannie; Dalsgaard Sorensen, John

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

  19. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  20. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  1. Operations Research Models for Scheduling Railway Infrastructure Maintenance

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella)

    2009-01-01

    textabstractIn the last decades, maintenance of technical systems has become increasingly impor- tant in many industries. Such systems are transport systems (rail, bus, airplane), civil engineering systems (roads, buildings, bridges), health care (hospitals), communication systems, manufacturing

  2. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  3. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  4. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Science.gov (United States)

    2010-10-01

    ... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...

  5. Legionellosis prevention in building water and HVAC systems a practical guide for design, operation and maintenance to minimize the risk

    CERN Document Server

    Joppolo, Cesare Maria; Pitera, Luca Alberto; Angermann, Jean Pierre; Izard, Mark

    2013-01-01

    This Guidebook is a practical guide for design, operation and maintenance to minimize the risk of legionellosis in building water and HVAC systmes. It is devided into several themes such as: Air conditioning of the air (by water – humidification), Production of hot water for washing (fundamentally but not only hot water for washing) and Evaporative cooling tower.

  6. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  7. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Greg; Pugh, Ray; Melendez, Aldo P.; Hunt, W. D.

    2010-08-04

    This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

  8. Study of the operation and maintenance of computer systems to meet the requirements of 10 CFR 73.55

    International Nuclear Information System (INIS)

    Lewis, J.R.; Byers, K.R.; Fluckiger, J.D.; McBride, K.C.

    1986-01-01

    The Pacific Northwest Laboratory has studied the operation and maintenance of computer-managed systems that can help nuclear power plant licensees to meet the physical security requirements of 10 CFR 73.55 (for access control, alarm monitoring, and alarm recording). This report of that study describes a computer system quality assurance program that is based on a system of related internal controls. A discussion of computer system evaluation includes verification and validation mechanisms for assuring that requirements are stated and that the product fulfills these requirements. Finally, the report describes operator and security awareness training and a computer system preventive maintenance program. 24 refs

  9. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  10. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... considering all available information. First, a theoretical damage model is formulated, the model is then updated using condition monitoring data, and the updated model is used as basis for risk-based decision making. Several approaches for solving the decision problems have been considered: various types...

  11. Using Field Data for Energy Efficiency Based on Maintenance and Operational Optimisation. A Step towards PHM in Process Plants

    Directory of Open Access Journals (Sweden)

    Micaela Demichela

    2018-03-01

    Full Text Available Energy saving is an important issue for any industrial sector; in particular, for the process industry, it can help to minimize both energy costs and environmental impact. Maintenance optimization and operational procedures can offer margins to increase energy efficiency in process plants, even if they are seldom explicitly taken into account in the predictive models guiding the energy saving policies. To ensure that the plant achieves the desired performance, maintenance operations and maintenance results should be monitored, and the connection between the inputs and the outcomes of the maintenance process, in terms of total contribution to manufacturing performance, should be explicit. In this study, a model for the energy efficiency analysis was developed, based on cost and benefits balance. It is aimed at supporting the decision making in terms of technical and operational solutions for energy efficiency, through the optimization of maintenance interventions and operational procedures. A case study is here described: the effects on energy efficiency of technical and operational optimization measures for bituminous materials production process equipment. The idea of the Conservation Supply Curve (CSC was used to capture both the cost effectiveness of the measures and the energy efficiency effectiveness. The optimization was thus based on the energy consumption data registered on-site: data collection and modelling of the relevant data were used as a base to implement a prognostic and health management (PHM policy in the company. Based on the results from the analysis, efficiency measures for the industrial case study were proposed, also in relation to maintenance optimization and operating procedures. In the end, the impacts of the implementation of energy saving measures on the performance of the system, in terms of technical and economic feasibility, were demonstrated. The results showed that maintenance optimization could help in reaching

  12. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  13. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used to upd...

  14. Operation and maintenance of the RA reactor in 1965

    International Nuclear Information System (INIS)

    Milosevic, D.

    1966-01-01

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966

  15. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  16. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  17. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, Darwin; Churby, Al; Krieger, Ed; Maloy, Donna; White, Kevin

    2012-01-01

    Highlights: ► NIF is a complex experimental facility composed of ∼4 million components. ► We describe business tools to define, build, operate, and maintain all components. ► CAD tools generate virtual models and assemblies under configuration control. ► Items requiring preventive, reactive, and/or calibration maintenance are tracked. ► Radiological or hazardous materials undergo additional controls. - Abstract: The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of experimental data and the safe operation of the facility. A major programmatic challenge is to deploy software solutions to effectively manage the definition, build, operation, and maintenance, and configuration control of all components of NIF. The strategy for meeting this challenge involves deploying and integrating an enterprise application suite of solutions consisting of both Commercial-Off-The-Shelf (COTS) products and custom developed software.This paper describes how this strategy has been implemented along with a discussion on the successes realized and the ongoing challenges associated with this approach.

  18. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  19. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  20. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Elzendoorn, B.S.Q.; Magielsen, A.J.; Schropp, G.Y.R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2) benchmark product. The benchmark product was used in task performance tests in a representative two-handed dexterous manipulation test bed at NRG. In the setup, the quality of visual feedback was varied by exchanging direct view with indirect view setups in which visual feedback is provided via video cameras. Interaction forces were measured via an integrated force sensor. The impact of feedback quality on the performance of maintenance tasks at the level of handling individual parts was measured and analysed. Remote execution of the maintenance actions took roughly 3-5 times more time than hands-on. Visual feedback was identified as the dominant factor, including aspects like (lack of) operator control over camera placement, pan, tilt and zoom, lack of 3D perception, image quality, and latency. Haptic feedback was found to be important, but only in specific contact transition and constrained motion tasks.

  1. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  2. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  3. Information exchange mainly on HTGR operation and maintenance technique between JAEA and INET in 2005

    International Nuclear Information System (INIS)

    Tachibana, Yukio; Hino, Ryutaro; Yu Suyuan

    2006-06-01

    The worldwide interests in the HTGR (High Temperature Gas-cooled Reactor) have been growing because the high temperature heat produced by the reactor can be utilized not only for efficient power generation but also for broad process heat applications, especially for thermo-chemical hydrogen production to fuel a prospective hydrogen economy in future. Presently only two HTGR reactors are operational in the world, including the HTTR (High Temperature Engineering Test Reactor) in Japan Atomic Energy Agency (JAEA) and the HTR-10 in the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University in China. JAEA and INET have cooperated since 1986 in the field of HTGR development, particularly on the HTTR and HTR-10 projects. This report describes the cooperation with emphasis on HTGR operation and maintenance techniques between JAEA and INET and outlines cooperation activities during the fiscal year 2005. (author)

  4. Comparison of all-remote and personnel access maintenance operations for INTOR

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, M.Y.; Stasko, R.R.

    1985-01-01

    The INTOR reference design was developed to permit limited maintenance operations external to the reactor in a ''hands-on'' mode; all internal operations would be remotely accomplished. The design embodies those requirements for shielding, tritium containment and cleanup, and confinement of contaminated particulate matter to permit personnel access. The cost reflects these requirements, at least first order. The impact of personnel access on the reactor design and its costs are cause to reexamine the maintenance approach on which much of the present configuration is based. The purpose of this study is to compare the benefits and costs associated with personnel access maintenance procedures to those associated with all-remote maintenance procedures and to identify modifications to the baseline design that could enhance maintenance operations

  5. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  6. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  7. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    International Nuclear Information System (INIS)

    MORTIMER, C.S.

    1999-01-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. It sets forth system operation and maintenance as well as failure response procedures

  8. Application of Risk Monitor MAREas tool in operation and maintenance

    International Nuclear Information System (INIS)

    Carretero, J. A.; Fuentes, I.

    2004-01-01

    From the very beginning and ongoing application objective of the Probabilistic Safety Assessment (PSA) was to develop Monitors. Their development was contingent on the PSA model computing capacity of the computer tools. the availability of effective tools, as well as the requirements of the Consejo de Seguridad Nuclear to apply the Maintenance Rule, have driven their implementation in Spain. The MARE application of Empresarios Agrupados presented herein has been developed for that purpose and has been implemented in Almaraz NPP. This article describes the process followed and experience in using it. (Author)

  9. Methods and Tools for Product Quality Maintenance in JPSS CGS

    Science.gov (United States)

    Cochran, S.; Smit, P.; Grant, K. D.; Jamilkowski, M. L.

    2015-12-01

    NOAA's next-generation environmental satellite, the Joint Polar Satellite System (JPSS) replaces the current Polar-orbiting Operational Environmental Satellites (POES). JPSS satellites carry sensors which collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The first JPSS satellite was launched in 2011 and is currently NOAA's primary operational polar satellite. The JPSS ground system is the Common Ground System (CGS), and provides command, control, and communications (C3) and data processing (DP). A multi-mission system, CGS provides combinations of C3/DP for numerous NASA, NOAA, DoD, and international missions. In preparation for the next JPSS satellite, CGS improved its multi-mission capabilities to enhance mission operations for larger constellations of earth observing satellites with the added benefit of streamlining mission operations for other NOAA missions. This paper will discuss both the theoretical basis and the actual practices used to date to identify, test and incorporate algorithm updates into the CGS processing baseline. To provide a basis for this support, Raytheon developed a theoretical analysis framework, and the application of derived engineering processes, for the maintenance of consistency and integrity of remote sensing operational algorithm outputs. The framework is an abstraction of the operationalization of the science-grade algorithm (Sci2Ops) process used throughout the JPSS program. By combining software and systems engineering controls, manufacturing disciplines to detect and reduce defects, and a standard process to control analysis, an environment to maintain operational algorithm maturity is achieved. Results of the use of this approach to implement algorithm changes into operations will also be detailed.

  10. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    Energy Technology Data Exchange (ETDEWEB)

    Dewan, Ashish; Stehly, Tyler

    2017-06-22

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  11. Operations and maintenance manual for the water/oil separator (F-2014)

    International Nuclear Information System (INIS)

    Nielsen, R.M.

    1996-01-01

    This Document Provides Operating, Maintenance and Spare Part Information for the Ultra Aqua UFA-6 Water/Oil Separator Installed at MASF. (The plant has been designed for processing of condensates from air compressors.)

  12. Introduction of electronic journal of advanced maintenance website structure and editorial operation

    International Nuclear Information System (INIS)

    Ito, Takashi; Nakamura, Mayu

    2009-01-01

    Electronic Journal of Advanced Maintenance (EJAM) has been issued on the website of Japan Society of Maintenology (JSM) on May 25th, 2009. This report introduces EJAM website structure and Editorial Operation. (author)

  13. Operations and Maintenance Manual for Expanded Bioventing System Site FC-2 Kelly AFB, Texas

    National Research Council Canada - National Science Library

    1996-01-01

    This Operations and Maintenance Manual has been created as a guide for monitoring and maintaining the performance of the bioventing blower and vent well plumbing at the Fire Training Area (Site FC-2...

  14. Point of Maintenance Ruggedized Operational Device Evaluation and Observation Test Report

    National Research Council Canada - National Science Library

    Gorman, Megan

    2002-01-01

    .... The Ruggedized Operational Device Evaluation and Observation (RODEO) test examined hardware packaging, software user interface, and environmental factors associated with the usability of potential Point of Maintenance (POMx) electronic tools...

  15. Ship Operations, Maintenance, Repair and Upgrade for the R/V KILO MOANA

    Science.gov (United States)

    2017-07-20

    From - To) 07/20/2017 Final Technical Report 03/19/2014 to 03/31/2017 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Ship Operations, Maintenance , Repair...NUMBER Office of Research Services 2440 Campus Road , Box 368 Honolulu, Hawai’i 96822-2234 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10...Office of Naval Research. 15. SUBJECT TERMS Research vessel, operation, maintenance , repair. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF a

  16. A training simulator ensures the competence of operating and maintenance staff

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L. [ed.

    1997-11-01

    IVO Generation Services Ltd (IGS) has overall responsibility made on the basis of long-term contracts for the operation and maintenance of the customers` power plants. Partnership is the key concept, and customers are thus able to concentrate on their own specific business activities. Research and development projects are primarily aimed at cutting the customer`s power generation costs and at increasing the efficiency of operation and maintenance

  17. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  18. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  19. Enhanced design, operation and maintenance practices for a longer plant service life

    International Nuclear Information System (INIS)

    Raimondo, E.; Courcoux, A.

    2004-01-01

    Plant service life problems have been under detailed investigation in France and the experience acquired by our company over the past 25 years in the design, construction and maintenance of Pressurized Water Reactors has contributed to develop skills, equipment and capabilities available for efficient plant aging management and component service life extension. The service life of a nuclear power plant is deeply dependant of the provisions made during the design stage, directly linked to good operating conditions and adequate maintenance practices. This paper presents the importance of these three steps (design, operation and maintenance) for plant service life concern. (author)

  20. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  1. Operation and maintenance of the T-3 cask system

    International Nuclear Information System (INIS)

    Hussey, M.W.; Berger, J.D.; Peterson, J.M.

    1983-01-01

    The T-3 cask system consists of three lead-shielded casks and the associated payload containers, internal fixturing, tiedowns, transportation trailers and handling devices. The three casks were designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 71. The Nuclear Regulatory Commission cask licensing activities for original design and for licensing revisions have required significant analytical support. Commercial transportation contractors can provide needed services including provisions of suitable equipment, compliances with security requirements, and safe movement of the shipment at a potential savings over DOE-owned transportation systems. Proper periodic inspection/maintenance activities supported by adequate decontamination facilities are a must in keeping the T-3 casks available for service

  2. Magnetic bearings promise reduced operation and maintenance costs

    International Nuclear Information System (INIS)

    Jones, G.

    1990-01-01

    Magnetic bearings are being incorporated into the design of the US DoE modular high temperature gas cooled reactor. The virtually maintenance-free bearing technology may have potential in other nuclear applications. In an active magnetic bearing, a stationary electromagnet (stator) and a rotating ferrous material (rotor) are used to allow a shaft to be suspended in a magnetic field. The position of the shaft is maintained dynamically using position sensors to provide a continuous feedback through a control and amplifier system to the electromagnetic poles which are used to suspend the shaft. Two separate systems are required: an axial positioning system, or thrust bearing, and a pair of radial positioning systems, or journal bearings. (author)

  3. Airbus A320 NEO Base Maintenance Concept SAS Operations

    OpenAIRE

    Dafgård, Oscar

    2017-01-01

    Detta arbete har utförts tillsammans med SAS, för att undersöka om ett base maintenance koncept med ett intervall på 36 månader skulle vara mer kostnadseffektivt än 24 månader för deras nya Airbus A320 NEO flotta. SAS, precis som alla andra flygbolag utnyttjar sina flygplan på sina egna och specifika vis. Eftersom inga flygbolag opererar på samma sätt kan inte heller underhållet skötas på samma sätt för en specifik flygplanstyp. Underhållsprogrammet behövde därför ses över för att optimeras g...

  4. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  5. Education and training of operators and maintenance staff at Hamaoka Nuclear Power Stations

    International Nuclear Information System (INIS)

    Makido, Hideki; Hayashi, Haruhisa

    1999-01-01

    At Hamaoka Nuclear Power Station, in order to ensure higher safety and reliability of plant operation, education and training is provided consistently, on a comprehensive basis, for all operating, maintenance and other technical staff, aimed at developing more capable human resources in the nuclear power division. To this end, Hamaoka Nuclear Power Station has the 'Nuclear Training Center' on its site. The training center provides the technical personnel including operators and maintenance personnel with practical training, utilizing simulators for operation training and the identical facilities with those at the real plant. Thus, it plays a central role in promoting comprehensive education and training concerning nuclear power generation. Our education system covers knowledge and skills necessary for the safe and stable operation of nuclear power plant, targeting new employees to managerial personnel. It is also organized systematically in accordance with experience and job level. We will report the present education and training of operators and maintenance personnel at Hamaoka Nuclear Training Center. (author)

  6. Environmental Management Model for Road Maintenance Operation Involving Community Participation

    Science.gov (United States)

    Triyono, A. R. H.; Setyawan, A.; Sobriyah; Setiono, P.

    2017-07-01

    Public expectations of Central Java, which is very high on demand fulfillment, especially road infrastructure as outlined in the number of complaints and community expectations tweeter, Short Mail Massage (SMS), e-mail and public reports from various media, Highways Department of Central Java province requires development model of environmental management in the implementation of a routine way by involving the community in order to fulfill the conditions of a representative, may serve road users safely and comfortably. This study used survey method with SEM analysis and SWOT with Latent Independent Variable (X), namely; Public Participation in the regulation, development, construction and supervision of road (PSM); Public behavior in the utilization of the road (PMJ) Provincial Road Service (PJP); Safety in the Provincial Road (KJP); Integrated Management System (SMT) and latent dependent variable (Y) routine maintenance of the provincial road that is integrated with the environmental management system and involve the participation of the community (MML). The result showed the implementation of routine maintenance of road conditions in Central Java province has yet to implement an environmental management by involving the community; Therefore developed environmental management model with the results of H1: Community Participation (PSM) has positive influence on the Model of Environmental Management (MML); H2: Behavior Society in Jalan Utilization (PMJ) positive effect on Model Environmental Management (MML); H3: Provincial Road Service (PJP) positive effect on Model Environmental Management (MML); H4: Safety in the Provincial Road (KJP) positive effect on Model Environmental Management (MML); H5: Integrated Management System (SMT) has positive influence on the Model of Environmental Management (MML). From the analysis obtained formulation model describing the relationship / influence of the independent variables PSM, PMJ, PJP, KJP, and SMT on the dependent variable

  7. System reliability as perceived by maintenance personnel on petroleum production facilities

    International Nuclear Information System (INIS)

    Antonovsky, A.; Pollock, C.; Straker, L.

    2016-01-01

    The aim of this research was to understand the relationship between maintenance staff perceptions of organisational effectiveness and operational reliability in petroleum operations. Engineering measures exist that assess the effectiveness of maintenance and reliability of equipment. These measures are typically retrospective and may not provide insight into what impedes system reliability. Perceptions of organisational effectiveness by the workforce may provide a predictive measure that could improve our understanding of the human factors that influence system reliability. Maintenance personnel (n=133) from nine petroleum production facilities completed a survey as part of a study of human factors and maintenance reliability. 69 respondents (51.9%) provided comments to an open-ended question in the survey, and these data were analysed using Interpretive Phenomenological Analysis to extract themes. Four super-ordinate themes were identified from the analysis: 1) Communication and access to information, 2) Efficiency of current work systems, 3) Need for better workgroup support, and 4) Management impacts on the workplace. We found a significant relationship between the frequency of the four super-ordinate themes and the facility reliability level as measured by ‘Mean Time Between Failures’: χ"2(6,N=158)=16.2, p=.013. These results demonstrated that operational effectiveness might be differentiated on the basis of survey-derived perceptions of maintenance personnel. - Highlights: • Thematic analysis of survey comments provided insights into workplace reliability • Worker’s comments on reliability related to technical data on time between failures • Management decision-making was the main theme in the lower reliability workplaces • Improving efficiency was the main theme in the higher reliability workplaces • Communication and better workgroup support were themes at all reliability levels

  8. Reactor operations, inspection and maintenance. PNGS Calibration Program

    International Nuclear Information System (INIS)

    Lopez, E.

    1997-01-01

    The PNGS Calibration Program is being implemented as a response to various concerns identified in recent PEER evaluations and AECB audits. Identified areas of concern were the approach to instrument calibration of Special Safety Systems (SSS). The implementation of a calibration program is a significant improvement in operating practices. A systematic and comprehensive approach to calibration of instrumentation will improve the quality of operation of the plant with a positive contribution to PNGS safety of operation and economic objectives. This paper describes the strategy to implement the proposed calibration program and describes its calibration data requirements. (DM)

  9. Introduction of total productive maintenance in steelworks plants

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2009-04-01

    Full Text Available The paper presents the concept of TPM - Total Productive Maintenance and its basic method 5S (sort, systematize, sweep, sanitize, self-discipline. The new management concept is realized in Japanese and USA companies. On the Polish market the methods was adopted in the first years of 21st century by car manufacturers and household equipment producers. Nowadays the concept is tested by steelworks in Polish steel industry. The process of introduction of these methods is long, difficult and requires organizational and technical changes. The companies which realize Awareness Management Project of workers in Health and Safety System use other methods whose primary goal is to ensure objectivity and comparability of results and skill assessment of particular employees (the Current and Periodic Assessment System for worker and supervision positions.

  10. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  11. Operation and maintenance techniques of pool and pool water purification system in IMEF

    Energy Technology Data Exchange (ETDEWEB)

    Soong, Woong Sup

    1999-03-01

    IMEF pool is used pass way between pool and hot cell in order to inlet and outlet of fuel pin in cask. All operation is performed conforming with naked eyes. Therefore floating matter is filtered so as to easy under water handling. Also radioactivity in pool water is controlled according to the nuclear law, radioactivity ration maintained less than 15mR/hr on pool side. Perfect operation and maintenance can be achieved well trained operator. Result obtained from the perfection can give more influence over restrain, spreading contamination of radioactivity materials. This report describes operation and maintenance technique of pool water purification system in IMEF. (Author). 7 refs., 13 figs.

  12. Operation and maintenance techniques of pool and pool water purification system in IMEF

    International Nuclear Information System (INIS)

    Soong, Woong Sup

    1999-03-01

    IMEF pool is used pass way between pool and hot cell in order to inlet and outlet of fuel pin in cask. All operation is performed conforming with naked eyes. Therefore floating matter is filtered so as to easy under water handling. Also radioactivity in pool water is controlled according to the nuclear law, radioactivity ration maintained less than 15mR/hr on pool side. Perfect operation and maintenance can be achieved well trained operator. Result obtained from the perfection can give more influence over restrain, spreading contamination of radioactivity materials. This report describes operation and maintenance technique of pool water purification system in IMEF. (Author). 7 refs., 13 figs

  13. RA reactor operation and maintenance; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air.

  14. Environmental Impacts of Airport Operations: Maintenance, and Expansion

    National Research Council Canada - National Science Library

    Luther, Linda

    2007-01-01

    ... impacts associated with airport operations and expansion are likely to be debated. This issue is important to various stakeholders, particularly those whose health, property values, and quality of life may be affected by such impacts...

  15. AIRCRAFT MAINTENANCE ENABLED JOINT CONCEPT FOR ENTRY OPERATIONS

    Science.gov (United States)

    2017-04-06

    The “off-equipment” AFSs have been reduced as well. Gone are the backshops of Electrical/Environmental, Hydraulics , Avionics, and Armament. The 5th...area (A2/AD) denial battlefronts. While this is a great concept, more must be done to reduce the logistics footprint, improve logistics agility and... reduce costs of logistics operations. Logisticians must always find a way to enable the operations that our Services require. Thesis From the

  16. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  17. Operation and maintenance manual of the accelerator installed in the facility of radiation standards

    International Nuclear Information System (INIS)

    Fujii, Katsutoshi; Kawasaki, Katsuya; Kowatari, Munehiko; Tanimura, Yoshihiko; Kajimoto, Yoichi; Shimizu, Shigeru

    2006-08-01

    4MV Van de Graff accelerator was installed in the Facility of Radiation Standards (FRS) in June 2000, and monoenergetic neutron calibration fields and high energy γ-ray calibration fields have been developed. The calibration fields are provided for R and D on dosimetry, and for the calibration and type-test of radiation protection instruments. This article describes the operational procedure, the maintenance work and the operation of the related apparatuses of the accelerator. This article focuses on the sufficient safety and radiation control for the operators, the maintenance performance of the accelerator, and on the prevention of the malfunction due to the mistakes of the operators. This article targets the unexperienced engineers in charge of operation and maintenance of the accelerator. (author)

  18. Intelligent Operation and Maintenance of Micro-grid Technology and System Development

    Science.gov (United States)

    Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian

    2018-01-01

    In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.

  19. Operation and maintenance of thermal power stations best practices and health monitoring

    CERN Document Server

    Chanda, Pradip

    2016-01-01

    This book illustrates operation and maintenance practices/guidelines for economic generation and managing health of a thermal power generator beyond its regulatory life. The book provides knowledge for professionals managing power station operations, through its unique approach to chemical analysis of water, steam, oil etc. to identify malfunctioning/defects in equipment/systems much before the physical manifestation of the problem. The book also contains a detailed procedure for conducting performance evaluation tests on different equipment, and for analyzing test results for predicting maintenance requirements, which has lent a new dimension to power systems operation and maintenance practices. A number of real life case studies also enrich the book. This book will prove particularly useful to power systems operations professionals in the developing economies, and also to researchers and students involved in studying power systems operations and control. .

  20. Operations and maintenance of the Gasunie Transportation System

    Energy Technology Data Exchange (ETDEWEB)

    Panman, Bert

    1999-07-01

    Gasunie is a one-of-a-kind company in the Netherlands. It has been trading and transmitting of natural gas since the 1960's. The company has a dominant position: 90% market share in the Netherlands and 23% in Western Europe. This presentation introduces the company and describes its 11,398 km long grid system, with compressor stations, blending stations, metering and regulation stations, gas delivery stations, export stations, storage of LNG, calibration systems and nitrogen plant. Gasunie experiences a changing environment characterized by liberalization of the gas market and technological development. The response of the company to this changing environment is overviewed. In addition to revising the commercial strategy, Gasunie continuously tries to cut costs by enabling information technology (IT), reduction of staff and other organizational changes, benchmarking, scrutinizing maintenance policies, and smart purchasing of goods and services. These efforts are discussed in turn. Finally, the implementation of SAP R/3 is discussed. SAP R/3 is SAP's integrated software solution for Client/Server and Distributed Open Systems.

  1. Overall Equipment Efficiency (OEE Enhancement in Manufacture of Electronic Components & Boards Industry through Total Productive Maintenance Practices

    Directory of Open Access Journals (Sweden)

    Fam Soo-Fen

    2018-01-01

    Full Text Available In an environment of intense global competition, both creative and proven strategies need to be considered in order to bring about the effectiveness and efficiency in manufacturing operation. Total Productive Maintenance (TPM is one of the effective maintenance strategy in enhancing the equipment effectiveness and to achieve a significant competitive advantage. This research paper addresses the impact of three TPM pillars namely planned maintenance (PM, autonomous maintenance (AM and focused maintenance (FM on overall equipment effectiveness (OEE of die attach equipment in the production line of semiconductor industry. The effect of TPM on the OEE is also investigated depending on the equipment types, in where die attach process consist of two models-CANON and ESEC. The primary data was collected from an organization's database and was analysed by SPSS V23. The preliminary results of the analysis showed that the performance of OEE in ESEC is better than the CANON after the implementation of TPM. The analysis also showed that out of the three TPM practices deployed, planned maintenance of equipment by production and maintenance team played the biggest role in increasing the equipment effectiveness. In conclusion, this study provides insights the importance of implementing TPM in order to succeed in a highly demanding market arena.

  2. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  3. Designing nuclear power plants for improved operation and maintenance

    International Nuclear Information System (INIS)

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig

  4. Designing nuclear power plants for improved operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig.

  5. TMI cable tracer operation and maintenance manual for assembly 417910

    International Nuclear Information System (INIS)

    Sumstine, R.L.

    1983-11-01

    This manual provides technical information and instructions to operate and maintain the cable tracer designed for the Three Mile Island (TMI) Unit 2 Reactor Building. The TMI cable tracer was developed to allow TMI personnel to trace cables in cable trays that may be tested or sectioned for destructive examination

  6. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  7. Product differentiation among health maintenance organizations: causes and consequences of offering open-ended products.

    Science.gov (United States)

    Wholey, D R; Christianson, J B

    1994-01-01

    Open-ended products that allow an HMO enrollee to use providers who are not affiliated with the HMO have become an important component of the Clinton administration's health reform proposal, because these products maintain consumer freedom of choice of any provider. However, little is known about the consequences of offering an open-ended product from an organizational standpoint. This paper uses a theory of "spatial competition" to examine the decisions of health maintenance organizations to offer an open-ended product and the effect of offering an open-ended product on their enrollment.

  8. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  9. Decision support for operations and maintenance (DSOM) system

    Science.gov (United States)

    Jarrell, Donald B [Kennewick, WA; Meador, Richard J [Richland, WA; Sisk, Daniel R [Richland, WA; Hatley, Darrel D [Kennewick, WA; Brown, Daryl R [Richland, WA; Keibel, Gary R [Richland, WA; Gowri, Krishnan [Richland, WA; Reyes-Spindola, Jorge F [Richland, WA; Adams, Kevin J [San Bruno, CA; Yates, Kenneth R [Lake Oswego, OR; Eschbach, Elizabeth J [Fort Collins, CO; Stratton, Rex C [Richland, WA

    2006-03-21

    A method for minimizing the life cycle cost of processes such as heating a building. The method utilizes sensors to monitor various pieces of equipment used in the process, for example, boilers, turbines, and the like. The method then performs the steps of identifying a set optimal operating conditions for the process, identifying and measuring parameters necessary to characterize the actual operating condition of the process, validating data generated by measuring those parameters, characterizing the actual condition of the process, identifying an optimal condition corresponding to the actual condition, comparing said optimal condition with the actual condition and identifying variances between the two, and drawing from a set of pre-defined algorithms created using best engineering practices, an explanation of at least one likely source and at least one recommended remedial action for selected variances, and providing said explanation as an output to at least one user.

  10. Design and operation of remote maintenance systems in JET

    International Nuclear Information System (INIS)

    Raimondi, T.

    1987-01-01

    The JET tokamak is a joint European project aimed at proving the viability of nuclear fusion as a source of energy. A remote handling system is being developed for this large experimental facility. Force feedback servomanipulators and TV cameras are positioned at work locations by large transporters. Positioning and tele-operation are computer-assisted. Special tools are being devised to facilitate difficult tasks

  11. Operations and maintenance manual for the linear accelerator (sled)

    Science.gov (United States)

    1981-01-01

    The Linear Accelerator, a sliding chair which is pulled along a stationary platform in a horizontal axis is described. The driving force is a motor controlled by a velocity loop amplifier, and the mechanical link to the chair is a steel cable. The chair is moved in forward and reverse directions as indicated by the direction of motor rotation. The system operation is described with emphasis on the electronic control and monitoring functions. Line-by-line schematics and wire lists are included.

  12. Education and training of operators and maintenance staff at commercial nuclear power stations in Japan

    International Nuclear Information System (INIS)

    Takahashi, M.; Kataoka, H.

    1998-01-01

    Safe and stable operation of a nuclear power station requires personnel fostering. In Japan, with the objectives of systematically securing qualified people for a long period of time, and maintaining and improving their skills and knowledge, the utilities have created strict personnel training plans, for continuous education and training. Concrete examples of education and training for operators and maintenance personnel at commercial nuclear power stations in Japan, such as education systems training, facility and contents of curriculum, are detailed including some related matters. Recent activities to catch up with environment changes surrounding education and training of operators and maintenance staff are also mentioned. (author)

  13. 40 CFR 63.7826 - How do I demonstrate initial compliance with the operation and maintenance requirements that...

    Science.gov (United States)

    2010-07-01

    ... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...

  14. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Science.gov (United States)

    2010-04-01

    ... and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS... the Contract School Operation and Maintenance Fund. The Secretary shall cause the distribution of an... an appropriate account or subaccount for the Contract School Operation and Maintenance Fund. ...

  15. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  16. 40 CFR 63.7710 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... defect or deficiency as soon as practicable. (2) Operating limits for each capture system for an... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my operation and maintenance requirements? 63.7710 Section 63.7710 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  17. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  18. 75 FR 62469 - Drawbridge Operation Regulations; Charles River, Boston, MA, Maintenance

    Science.gov (United States)

    2010-10-12

    ... Operation Regulations; Charles River, Boston, MA, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of... Craigie Bridge across the Charles River at mile 1.0, has a vertical clearance of 10.25 feet at normal pool... temporary deviation from the regulation governing the operation of the Craigie Bridge across the Charles...

  19. Landfill gas operation and maintenance manual of practice

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This manual has the following objectives: (1) compile and present key portions of the general body of knowledge about operating and maintaining LFG control systems; (2) present information in an easy to understand format useful for hands-on practical use in the field; (3) present accepted practices and procedures for LFG control practices; (4) highlight key points, common mistakes and lessons learned from more than 20 years of industry experience, point out areas of controversy and indicate alternative practices where applicable; (5) compile key reference information; and (6) provide theory and discussion needed to develop a deeper understanding of LFG control and recovery.

  20. Increasing Air Compressor Productivity While Reducing Maintenance and Repair Costs

    National Research Council Canada - National Science Library

    Foss, R. S

    1993-01-01

    .... When this vital utility is put into this perspective we can start to deal with the considerations of systems engineering, planning, performance evaluation, cost control and preventive maintenance...

  1. Standard Hydrogen Monitoring System-C operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The primary function of the SHMS-C is to monitor specifically for hydrogen in the waste tank vapor space which may also contain (but not be limited to) unknown quantities of air, nitrous oxide (N 2 O), ammonia (NH 3 ), water vapor, carbon dioxide (CO 2 ), carbon monoxide (CO) and other gaseous constituents. An electronically controlled grab sampler has replaced the manually operated sample system that was used in the original SHMS enclosure. Samples can now be operator or automatically initiated. Automatic initiation occurs based on the high hydrogen alarm level. Once a sample is obtained it is removed from the sampler and transported to a laboratory for analysis. This system is used to identify other gaseous constituents which are not measured by the hydrogen monitor. The design does not include any remote data acquisition or remote data logging equipment but provides a 4--20 mA dc process signals, and discrete alarm contacts, that can be utilized for remote data logging and alarming when desired. The SHMS-C arrangement consists of design modifications (piping, valves, filters, supports) to the SHMS-B arrangement necessary for the installation of a dual column gas chromatograph and associated sample and calibration gas lines. The gas chromatograph will provide real time, analytical quality, specific hydrogen measurements in low and medium range concentrations. The system is designed to sample process gases that are classified by NEC code as Class 1, Division 1, Group B

  2. The radioactive materials packaging handbook: Design, operations, and maintenance

    International Nuclear Information System (INIS)

    Shappert, L.B.; Bowman, S.M.; Arnold, E.D.

    1998-01-01

    As part of its required activities in 1994, the US Department of Energy (DOE) made over 500,000 shipments. Of these shipments, approximately 4% were hazardous, and of these, slightly over 1% (over 6,400 shipments) were radioactive. Because of DOE's cleanup activities, the total quantities and percentages of radioactive material (RAM) that must be moved from one site to another is expected to increase in the coming years, and these materials are likely to be different than those shipped in the past. Irradiated fuel will certainly be part of the mix as will RAM samples and waste. However, in many cases these materials will be of different shape and size and require a transport packaging having different shielding, thermal, and criticality avoidance characteristics than are currently available. This Handbook provides guidance on the design, testing, certification, and operation of packages for these materials

  3. The radioactive materials packaging handbook: Design, operations, and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Shappert, L.B.; Bowman, S.M. [Oak Ridge National Lab., TN (United States); Arnold, E.D. [Lockheed Martin Energy Systems, Oak Ridge, TN (United States)] [and others

    1998-08-01

    As part of its required activities in 1994, the US Department of Energy (DOE) made over 500,000 shipments. Of these shipments, approximately 4% were hazardous, and of these, slightly over 1% (over 6,400 shipments) were radioactive. Because of DOE`s cleanup activities, the total quantities and percentages of radioactive material (RAM) that must be moved from one site to another is expected to increase in the coming years, and these materials are likely to be different than those shipped in the past. Irradiated fuel will certainly be part of the mix as will RAM samples and waste. However, in many cases these materials will be of different shape and size and require a transport packaging having different shielding, thermal, and criticality avoidance characteristics than are currently available. This Handbook provides guidance on the design, testing, certification, and operation of packages for these materials.

  4. Engenharia, manutenção e operação em processos contínuos: elementos para o projeto de fronteiras organizacionais móveis e interpenetrantes Integrated organizational design for operations, engineering and maintenance in continuous process production: a pratical issue and a conceptual gap

    Directory of Open Access Journals (Sweden)

    Mario Sergio Salerno

    2008-08-01

    Full Text Available Nos processos contínuos há uma forte participação dos profissionais da manutenção e da engenharia na operação do sistema de produção. Manutenção e engenharia atuam diretamente na operação quando especificam parâmetros de controle do processo, intervêm em eventos previstos ou não, resolvem problemas de grande complexidade tecnológica e logística, e modificam processos e equipamentos para obter melhores resultados. Por outro lado, é a operação que detém o conhecimento de como realizar manobras, da inércia das instalações para responder a comandos, dos efeitos práticos do encadeamento e desdobramento de manobras, da alteração de parâmetros de controle, ou da indisponibilidade de equipamento, influenciando decisivamente o espectro de ação da engenharia e da manutenção. Não obstante, mesmo as mais avançadas e contemporâneas abordagens para projeto organizacional não apresentam critérios integrados de projeto para essas três decisivas funções, que se interpenetram. Ou seja, abordar-se-á não a interface tradicional, estática, entre as áreas, mas a sua interpenetração e ação de operação. Nesses termos, o objetivo deste trabalho é contribuir na construção de um quadro de referência e de critérios de projeto integrado das três áreas, a partir de estudo de caso de refinaria de petróleo multiprocessos, caso típico de processo contínuo.Engineering and Maintenance participate strongly in continuous process operations. They determine process control parameters; act decisively in production events; solve complex problems; and design modifications in production processes and hardware aimed at achieving productive, economic and environmental goals. On the other hand, Operations teams possess pragmatic knowledge of operational procedures, of hardware responses to process control commands, and of changes in production processes such as equipment failures or new production parameters. Their knowledge must

  5. Artificial Intelligent Platform as Decision Tool for Asset Management, Operations and Maintenance.

    Science.gov (United States)

    2018-01-04

    An Artificial Intelligence (AI) system has been developed and implemented for water, wastewater and reuse plants to improve management of sensors, short and long term maintenance plans, asset and investment management plans. It is based on an integrated approach to capture data from different computer systems and files. It adds a layer of intelligence to the data. It serves as a repository of key current and future operations and maintenance conditions that a plant needs have knowledge of. With this information, it is able to simulate the configuration of processes and assets for those conditions to improve or optimize operations, maintenance and asset management, using the IViewOps (Intelligent View of Operations) model. Based on the optimization through model runs, it is able to create output files that can feed data to other systems and inform the staff regarding optimal solutions to the conditions experienced or anticipated in the future.

  6. Design of an operator support system for online maintenance at nuclear power plant

    International Nuclear Information System (INIS)

    Chu Yongyue; Li Huwei; Gao Qiang; Yi Yan; Yang Ming

    2013-01-01

    Online maintenance based on reliability centered management is pivotal for the safe and economical operation of Nuclear Power Plant (NPP). This paper presents an operator support system through which the operators can effectively manage plant configuration and identify the weaknesses in plant operation. The proposed operator support system is based on the GO-FLOW, which is a success-oriented availability analysis methodology and can be used for evaluating phased missions. In this paper, the design of the proposed operator support system is introduced through a case study of the Auxiliary Feed Water System (AFWS). (author)

  7. Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

    Science.gov (United States)

    Mitchell, Christine M.

    1998-01-01

    Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

  8. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  9. Tackling the knowledge needs of maintenance and operation staff in mouldy housing

    DEFF Research Database (Denmark)

    Bonderup, Sirid; Gunnarsen, Lars Bo

    2017-01-01

    Interdisciplinary collaboration is key when it comes to solving and preventing mould problems in housing. Many forms of collaboration is necessary, not just between operating staff, inhabitants, management and tradespersons, but also knowing and working with the building structure in question...... discussed how a digital tool could help operating staff gather, share and systematise knowledge of local conditions and practices in order to improve operation and maintenance....

  10. Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance and Modernization Cost Savings

    Science.gov (United States)

    2015-03-21

    Policy - 37 - Naval Postgraduate School the number of brazes and welds from 25 to just five. There are currently more than 300 3D printing ...NPS-LM-15-002 ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D ...Program Sponsored Report Series Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning Technology, and Collaborative

  11. JIT maintenance improves the productivity and energy efficiency of the system

    Directory of Open Access Journals (Sweden)

    Marković Željko M.

    2016-01-01

    Full Text Available Maintenance planning in order to ensure the smooth functioning of the system, optimal interaction of system with the environment, and timely responses to the set requirements is one of the most important internal resources of the organization. Just-In-Time Maintenance enables rarely downtime and lower maintenance costs throughout the life cycle of the system, and dramatically increases the productivity and energy efficiency of the entire system. By adopting of the Just-In-Time Maintenance philosophy, minimum of objective function of energy or production system, as well as of production of services system, is achieved.

  12. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  13. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  14. Technical requirements on knowledge base and instrumentation system for decision making in plant operation and maintenance

    International Nuclear Information System (INIS)

    Kitamura, Masaharu; Yoshikawa, Shinji; Hasegawa, Makoto

    1998-03-01

    A series of technical surveys and studies are described in this report to examine and identify technical requirements to be posed on knowledge base and instrumentation system as the fundamental in high reliability computational decision making in operation and maintenance of nuclear power plants. Monitoring and diagnosis are focused as the important tasks among the operation/maintenance-related tasks. A concrete monitoring and diagnosis system configuration has been proposed consisting of distributed symptom database and of on-demand measurement subsystem. An prototype of the proposed system configuration has been successfully verified. (author)

  15. Proposal for the award of a contract for the maintenance and operation of CERN's sewage installations

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the maintenance and operation of CERN's sewage installations. The Finance Committee is invited to agree to the negotiation of a contract with VALLIER ASSAINISSEMENT (FR), the lowest bidder, for the maintenance and operation of CERN's sewage installations for a period of three years for a total amount of 1 745 897 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  16. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    Science.gov (United States)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  17. Operation and maintenance manuals for VEGA apparatus on radionuclide release from irradiated fuel

    International Nuclear Information System (INIS)

    Hayashida, Retsu; Hidaka, Akihide; Nakamura, Takehiko; Kudo, Tamotsu; Ohtomo, Takashi; Uetsuka, Hiroshi

    2001-03-01

    An experimental program, Verification Experiments of radionuclides Gas/Aerosol release (VEGA), was initiated at JAERI from September 1999 to improve source term predictabilities for hypothetical severe accidents. In the experiment, a short fuel segment taken from LWR fuels irradiated in Japanese power reactors is inductively heated to high temperatures (∼3273K) in a hot cell under high pressure conditions up to 1.0MPa. Particularly, a focus will be placed on the release and transport behaviors of low-volatile fission products (FP), actinides and short-life FP which have not been well investigated in previous studies. This experimental apparatus was completed in February 1999 and three experiments were performed by the end of 2000. Most of these experiments were successfully conducted, but some problems were also found. Especially, in the first VEGA-1 test with the purpose of shakedown and reference data acquisition, there were problems such as flow blockage at the outlet of furnace due to structure melting, malfunction of heaters and so on. Therefore, the design for these defective parts was changed for future experiments. Moreover, the apparatus is not so big but the entire processes are very complicated. Accordingly, the operators should well understand the details of the apparatus including the recent change of design. This report describes outlines of the VEGA apparatus and the procedures for operation and maintenance. (author)

  18. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  19. Two-stage maintenance of a production system with exponentially distributed on and off-periods

    NARCIS (Netherlands)

    van Dijkhuizen, G.C.; van Harten, Aart

    1998-01-01

    We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled

  20. Control software architecture and operating modes of the Model M-2 maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Satterlee, P.E. Jr.; Martin, H.L.; Herndon, J.N.

    1984-04-01

    The Model M-2 maintenance system is the first completely digitally controlled servomanipulator. The M-2 system allows dexterous operations to be performed remotely using bilateral force-reflecting master/slave techniques, and its integrated operator interface takes advantage of touch-screen-driven menus to allow selection of all possible operating modes. The control system hardware for this system has been described previously. This paper describes the architecture of the overall control system. The system's various modes of operation are identified, the software implementation of each is described, system diagnostic routines are described, and highlights of the computer-augmented operator interface are discussed. 3 references, 5 figures.

  1. Control software architecture and operating modes of the Model M-2 maintenance system

    International Nuclear Information System (INIS)

    Satterlee, P.E. Jr.; Martin, H.L.; Herndon, J.N.

    1984-04-01

    The Model M-2 maintenance system is the first completely digitally controlled servomanipulator. The M-2 system allows dexterous operations to be performed remotely using bilateral force-reflecting master/slave techniques, and its integrated operator interface takes advantage of touch-screen-driven menus to allow selection of all possible operating modes. The control system hardware for this system has been described previously. This paper describes the architecture of the overall control system. The system's various modes of operation are identified, the software implementation of each is described, system diagnostic routines are described, and highlights of the computer-augmented operator interface are discussed. 3 references, 5 figures

  2. Upgrading of operation and maintenance. Lessons learned by ENEL- Nuclear Plant Management

    International Nuclear Information System (INIS)

    Bolla, Giuseppe; Panini, Giulio

    1999-01-01

    A presentation and general information on ENEL are given. The Italian Authority for Electric Energy (Ente Nazionale per l'Energia Electrica - ENEL), entirely owned by the Italian Ministry of Treasury, is the third largest utility in the world after EDF of France and TEPCO of Japan. The following figures are featuring its size: - Net maximum capacity = 52.463 GW; - Power generation = 182,500 GW h; - Customer = 28.2 Million; - Hydroelectric power plants = 651 (16.327 MW); - Thermoelectric power units = 206 (35,666 MW); - Geothermal power units = 36 (470 MW). The ENEL core business consists of generation, transmission, distribution and sale throughout Italy of electric power produced from any source as well as the importation and exportation of electric power and the co-ordination of operational and planning activities in order to ensure adequate availability throughout Italian territory of electric power at minimum cost. Before the decision taken for political reason by Italian Government in 1988 to terminate nuclear power plants operation and construction, 4 NPPs have been successfully operated. The whole production of the four plants has been about 90 billion kWh. The management experience for these plants has been good, both for plant availability and safety. No operating events occurred arising any risk for workers, population and environment. The Chernobyl power plant accident induced Italy to promote the 'nuclear referendum' in November 1987. Following the referendum the nuclear power production was interrupted. After 1988 the following nuclear activities has been carried out: - plant safe conservation, decommissioning planning, cost evaluation and safe enclosure preparation; - investigation for waste treatment methods; - participation in requirement definition and design activity for next NPP generation. A specific experience has been accumulated in the decommissioning of Italian NPPs, due to their anticipated shutdown, in particular in the field of

  3. Assessment of reliability and maintenance of motor operated valves at Finnish NPPS

    International Nuclear Information System (INIS)

    Laakso, K.; Haenninen, S.; Simola, K.

    1994-01-01

    This paper summarizes two studies on motor operated valve (MOV) failure and maintenance experiences in Finnish nuclear power plants. In the first study, described in section 2 of this paper, the failure reports of MOVs at Finnish BWR units from a nine years' time period were analyzed in a systematic way. The dominant failure mechanisms were identified and time-dependencies in failure occurrence were studied. This study initiated an experience based reliability centered maintenance (RCM) analysis of motor operated valve drives, which is summarized in chapter 3 of this paper. The RCM analysis resulted in the identification and proposal of the most suitable and effective maintenance tasks for consideration. 9 refs, 3 figs, 1 tab

  4. Establishment of computer aided technology for operation, maintenance, and core management

    International Nuclear Information System (INIS)

    Iguchi, Masaki; Isomura, Kazutoshi; Okawa, Tsuyoshi; Sakurai, Naoto

    2003-01-01

    In Fugen, the accumulated know-how of skilled operators, maintenance engineers, and core management engineers have been systematized by using the latest computer technology. These computerized systems have enhanced the technology of operating, maintenance and core management. This report describes the development of a reactor feed water control system with fuzzy logic, a refueling support system, and an automatic refueling planning system. Since operation of reactor feedwater control at low power requires a delicate operational technique and the knowledge and experience of operators, the application of a fuzzy algorithm was deemed effective in Fugen. Its good performance comparable to that of experienced operators can be realized. The fuel-handling operation takes proposed plans, fuel management and efficient operation by skilled operators. AI technology was applied to fuel-handling support system using past operation results and experience of skilled operators. This system is as capable of fuel-handling as skilled operators. Planning an adequate fuel loading pattern is time-consuming even for expert core management engineers. The Automatic Refueling Planning System (ARPS) was developed using Genetic Algorithms (GA) and a Simulated Annealing (SA). It has been verified that long-term fuel loading patterns of the Fugen NPS evaluated by ARPS are equivalent to that of an expert core management engineer. (author)

  5. Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning Technology, and Collaborative Product Life-Cycle Management on Ship Maintenance and Modernization Cost Savings

    Science.gov (United States)

    2015-04-30

    ååì~ä=^Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã= tÉÇåÉëÇ~ó=pÉëëáçåë= sçäìãÉ=f= = Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser...COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser Scanning...Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 182 - Make or Buy: An Analysis of the Impacts of 3D Printing Operations, 3D Laser

  6. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 2

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-10-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit at the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  7. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 1

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-09-01

    This manual provides detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit of the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  8. 43 CFR 404.40 - What is the non-Federal share of operation, maintenance, and replacement costs?

    Science.gov (United States)

    2010-10-01

    ... Cost-Sharing § 404.40 What is the non-Federal share of operation, maintenance, and replacement costs? You are required to pay 100 percent of the operation, maintenance, and replacement costs of any rural... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the non-Federal share of operation...

  9. Online Condition Monitoring of Bearings to Support Total Productive Maintenance in the Packaging Materials Industry.

    Science.gov (United States)

    Gligorijevic, Jovan; Gajic, Dragoljub; Brkovic, Aleksandar; Savic-Gajic, Ivana; Georgieva, Olga; Di Gennaro, Stefano

    2016-03-01

    The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings.

  10. Online Condition Monitoring of Bearings to Support Total Productive Maintenance in the Packaging Materials Industry

    Directory of Open Access Journals (Sweden)

    Jovan Gligorijevic

    2016-03-01

    Full Text Available The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings.

  11. The mapping and preparation of human resources for NPP’S operation and maintenance in Indonesia

    International Nuclear Information System (INIS)

    Moch-Djoko Birmano; Yohanes Dwi Anggoro

    2013-01-01

    The preparation of the competent human resources (HRs) is one of the basic infrastructure of NPP’s development. IAEA recommends that at the initial activity in preparation of human resources for NPP is doing Business Process Mapping by identifying the knowledge, skills and abilities of required human resources to carry out the operation and maintenance of NPPs. This study aims to mapping and preparing of human resources for NPP’s operation and maintenance in Indonesia. The method used are mapping business processes at operation and maintenance stage of NPP, identifying positions, conducting surveys with questionnaires and calculations, and data analysis. Surveys and questionnaires to determine the level of technical competence of personnel in BATAN at operation and maintenance stage. Analysis using the Method of Gap Analysis with human resources Competency Standards Criteria based on technical competence qualifications. This study uses the assumption that the nuclear power plant will be built 2 units (twin) and start operation in 2027. The results showed that from the aspect of education, BATAN able to meet the needs of human resources at 53.64 to 73.75%. While from the aspect of training and specific work experience, participation level of BATAN’s human resources is still very low of IAEA requirements. This case caused because young human resources in BATAN who have educational qualifications, experience, training and technical certifications in the field of operation and maintenance of nuclear power plants is still limited. Based on this, there should be preparation of NPP’s human resources with establish NPP’s human resources development program based on required qualifications. (author)

  12. Lessons learned from the Maintenance Rule implementation at Northeast Utilities operating plants

    International Nuclear Information System (INIS)

    Hastings, K.B.; Khalil, Y.F.; Johnson, W.

    1996-01-01

    The Maintenance Rule as described in 10CFR50.65 requires holders of all operating nuclear power plants to monitor the performance of structures, systems, and components (SSCs) against licensee-established performance criteria. The Industry with the assistance of the Nuclear Energy Institute (NEI) developed a guideline, which includes all parts of the Maintenance Rule, to establish these performance criteria while incorporating safety and reliability of the operating plants. The NUMARC 93-01 Guideline introduced the term ''Risk Significant'' to categorize subsets of the SSCs which would require increased focus, from a Maintenance Rule perspective, in setting their performance criteria. Northeast Utilities Company (NU) operates five nuclear plants three at Millstone Station in Waterford, Connecticut; the Connecticut Yankee plant in Haddam Neck, Connecticut; and the Seabrook Station in Seabrook, New Hampshire. NU started the implementation process of the Maintenance Rule program at its five operating plants since early 1994, and have identified a population of risk significant SSCs at each plant. Recently, Northeast Utilities' Maintenance Rule Team re-examined the initial risk significant determinations to further refine these populations, and to establish consistencies among its operating units. As a result of the re-examination process, a number of inconsistencies and areas for improvement have been identified. The lessons learned provide valuable insights to consider in the future as one implements more risk based initiatives such as Graded QA and Risk-Based ISI and IST. This paper discusses the risk significance criteria, how Northeast Utilities utilized NUMARC 93-01 Guideline to determine the risk significant SSCs for its operating plants, and lessons learned. The results provided here do not include the Seabrook Station

  13. Maintenance self-assessments - An INPO [Institute of Nuclear Power Operation] perspective

    International Nuclear Information System (INIS)

    Subalusky, W.T.

    1990-01-01

    In March 1987, all nuclear utilities in the US were requested by the Institute of Nuclear Power Operations (INPO) to perform a self-assessment of their maintenance programs. The goal of these self-assessments was to have each station identify any existing problem areas in maintenance in clear and sufficient detail to determine the root causes of the problems and to provide a foundation for subsequent corrective actions. The self-assessments were to be performed by each nuclear station using the INPO document Guidelines for the Conduct of Maintenance at Nuclear Power Stations. By December 1987, 72 of 74 stations had completed the self-assessments, and by the middle of 1988, all stations had completed this systematic review of their maintenance programs. As part of an industry plan to ensure continued improvements in maintenance, INPO is following up on the effectiveness of these self-assessments during the course of plant evaluation visits. This presentation briefly reviews the approaches to self-assessment of the station's maintenance programs, some of the lessons learned from this effort, and the results, to date, of INPO follow-up efforts in this area

  14. 75 FR 78601 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2010-12-16

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. Under this temporary deviation a two.... SUPPLEMENTARY INFORMATION: The Witt Penn Bridge, across the Hackensack River at mile 3.1 has a vertical...

  15. 76 FR 11959 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2011-03-04

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. The deviation is necessary to perform... River at mile 3.1 has a vertical clearance in the closed position of 35 feet at mean high water and 40...

  16. 33 CFR 208.10 - Local flood protection works; maintenance and operation of structures and facilities.

    Science.gov (United States)

    2010-07-01

    ... shall be brought to a satisfactory condition or shall be promptly replaced. Diesel and gasoline engines... machines, fuel for gasoline or diesel powered equipment, and flash lights or lanterns for emergency... the efficient operation and maintenance of all of the structures and facilities during flood periods...

  17. IVO Group wins its first operation and maintenance contract in Indonesia

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Indonesia is one of the world's fastest growing power markets, with electricity demand rising by some 13 % annually: Finland's IVO has recently teamed up with an Indonesian partner to tap into this lucrative and competitive market. IVO's contract signed in March 1997, covers the operation and maintenance of two coal-fired power plants for a period of ten years

  18. Manpower and training requirements for operation and maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Shah, J.C.

    1975-01-01

    The experience in India with regard to the staffing of nuclear power station operations and maintenance is encouraging in the sense that given the effort and time, developing countries should not find it unduly difficult to meet their requirements. (orig.) [de

  19. Plant design and layout of the different buildings with respect to safety, operational and maintenance requirements

    International Nuclear Information System (INIS)

    Liebich, H.

    1981-01-01

    The descriptions and pictures in this lecture show that the arrangement of the buildings and the location of components and systems are based on proven ideas with the aim to fulfil safety, operational and maintenance requirements also from the point of view of plant layout. (orig.)

  20. Elements for designing ALARA programmes for the maintenance and routine operations of nuclear facilities

    International Nuclear Information System (INIS)

    Lefaure, C.; Croft, J.R.

    1991-01-01

    This article briefly reviews the three fundamental elements for designing ALARA programmes for the maintenance and routine operations of nuclear facilities. These are the need for commitment of all parties involved, the need for specific ALARA organizational structures and the systematic use of ALARA tools. (UK)

  1. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  2. Community College Finance: A Cost Analysis of Community College Expenditures Related to Maintenance and Operations

    Science.gov (United States)

    Collins, Michael T.

    2011-01-01

    The purpose of this study is to develop a costing model for maintenance and operations expenditures among 16 single-campus California community college districts and assess the impact of a variety of variables including size of student enrollment, physical plant age, acreage, gross square footage, and general obligation facility bonds on district…

  3. Traditional Learning vs Virtual Learning in maintenance operations thoughts and reflections from a safety perspective

    NARCIS (Netherlands)

    Martinetti, Alberto; 't Hart, Koen; Bernatik, Ales; Kocurkova, Lucie; Jorgensen, Kirsten

    2018-01-01

    Flexibility in maintenance operations is one of the requirements for a successful management of capital asset industries nowadays. It demands both the deployment of technology, equipment and man-forces and to provide effective training to the technicians for maintaining the assets in a correct and

  4. Pilgrim Nuclear Power Station, Unit 1. Fifth semiannual operating and maintenance report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    During this period the reactor was critical for 3,550.3 hrs and the net electrical power generated was 1,973,033 MWH. Information is presented concerning operations, maintenance, radioactive effluents, environmental monitoring, and radioactive materials released to unrestricted areas. (U.S.)

  5. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  6. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    Science.gov (United States)

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  7. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    Science.gov (United States)

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  8. Implementation of Total Productive Maintenance (TPM to Improve Sheeter Machine Performance

    Directory of Open Access Journals (Sweden)

    Candra Nofri Eka

    2017-01-01

    Full Text Available This paper purpose is an evaluation of TPM implementation, as a case study at sheeter machine cut size line 5 finishing department, PT RAPP, Indonesia. Research methodology collected the Overall Equipment Effectiveness (OEE data of sheeter machine and computed its scores. Then, OEE analysis big losses, statistical analysis using SPSS 20 and focused maintenance evaluation of TPM were performed. The data collected to machine sheeter’s production for 10 months (January-October 2016. The data analyses was resulted the OEE average score of 82.75%. This score was still below the world class OEE (85% and the company target (90%. Based the big losses of OEE analysis was obtained the reduce speed losses, which most significant losses of OEE scores. The reduce speed losses value was 44.79% of total losses during the research period. The high score of these losses due to decreasing of machine production speed by operators, which intended to improve the quality of resulting products. The OEE scores statistical analysis was found breakdown losses and reduces speed losses, which significantly affected to OEE scores. Implementations of focused maintenance of TPM in the case study may need to improve because there were still occurred un-expecting losses during the research period.

  9. Main indicators used in french PWR units for safety, operation and maintenance

    International Nuclear Information System (INIS)

    Guio, J.M. de

    1990-01-01

    The development of analyses aimed at improving nuclear plant operations through an optimum use of experience feedback naturally leads to the implementation of trend indicators in the fields of safety, operation and maintenance. This process, part of the more general framework of promoting safety culture, facilitates collective thinking on these matters at the local site level, and, at the national level, allows a clearer definition of the main lines of strategy and helps coordinate the resulting actions

  10. Operation and maintenance of the RB reactor, Annual report for 1977

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1977-01-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators

  11. Operation and maintenance experience at the General Atomic Company's TRIGA reactor facility at San Diego, California

    International Nuclear Information System (INIS)

    Whittemore, W.L.; Stout, W.A.; Shoptaugh, J.R.; Chesworth, R.H.

    1982-01-01

    Since the startup of the original 250 kW TRIGA Mark I reactor in 1958, General Atomic Company has accumulated nearly 24 years of operation and maintenance experience with this type of reactor. In addition to the nearly 24 years of experience gained on the Mark I, GA has operated the 1.5 MW Advanced Prototype Test Reactor (Mark F) for 22 years and operated a 2 MW below-ground TRIGA Mark III for five years. Information obtained from normal and abnormal operation are presented. (author)

  12. Study of distribution of doses in maintenance operations and interventions in restricted areas of IPEN's radiopharmacy center, Brazil

    International Nuclear Information System (INIS)

    Machado, Jessica S.; Souza, Daiane C.; Rodrigues Junior, Orlando; Gerulis, Eduardo; Todo, Alberto S.

    2013-01-01

    This research was developed at the Radiopharmacy Center of the Nuclear and Energy Research Institute - IPEN/CNEN/SP, Brazil, that performs the production of radiopharmaceuticals with isotopes of the 131 I, 123 I, 201 Tl, 67 Ga, 18 F and 99 Mo for use in nuclear medicine. The radioisotopes are produced on an industrial scale and the installation was designed to meet radiation safety standards and quality control requirements. To ensure the production, there are skilled professionals who perform the tasks of maintenance of the equipment and instruments, installed in the cells of processing of radiopharmaceuticals, without which it is not possible to conduct the work with safety and quality. This study was done a survey called Survey of Variables, based on the maintenance operations and interventions in restricted areas of the Centre of Radiopharmacy and in the survey of the distribution of doses in these tasks, carried out during the period from 2005 to 2011. This research aims to identify and determine the main variables that have an impact on the worker's dose. The results are presented for the Occupationally Exposed Individual variable, variable operation, variable area/Cell, task and Feature variable and variable duration of operation, depending on the Dose variable. It is intended in this way to contribute to improvements in operations in restricted areas that may result in lower individual doses without causing significant changes in the routine of work

  13. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  14. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    NARCIS (Netherlands)

    Heemskerk, C. J. M.; Elzendoorn, B. S. Q.; Magielsen, A. J.; Schropp, G. Y. R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2)

  15. Risk assessment of maintenance operations: the analysis of performing task and accident mechanism.

    Science.gov (United States)

    Carrillo-Castrillo, Jesús A; Rubio-Romero, Juan Carlos; Guadix, Jose; Onieva, Luis

    2015-01-01

    Maintenance operations cover a great number of occupations. Most small and medium-sized enterprises lack the appropriate information to conduct risk assessments of maintenance operations. The objective of this research is to provide a method based on the concepts of task and accident mechanisms for an initial risk assessment by taking into consideration the prevalence and severity of the maintenance accidents reported. Data were gathered from 11,190 reported accidents in maintenance operations in the manufacturing sector of Andalusia from 2003 to 2012. By using a semi-quantitative methodology, likelihood and severity were evaluated based on the actual distribution of accident mechanisms in each of the tasks. Accident mechanisms and tasks were identified by using those variables included in the European Statistics of Accidents at Work methodology. As main results, the estimated risk of the most frequent accident mechanisms identified for each of the analysed tasks is low and the only accident mechanisms with medium risk are accidents when lifting or pushing with physical stress on the musculoskeletal system in tasks involving carrying, and impacts against objects after slipping or stumbling for tasks involving movements. The prioritisation of public preventive actions for the accident mechanisms with a higher estimated risk is highly recommended.

  16. Approximation by max-product type operators

    CERN Document Server

    Bede, Barnabás; Gal, Sorin G

    2016-01-01

    This monograph presents a broad treatment of developments in an area of constructive approximation involving the so-called "max-product" type operators. The exposition highlights the max-product operators as those which allow one to obtain, in many cases, more valuable estimates than those obtained by classical approaches. The text considers a wide variety of operators which are studied for a number of interesting problems such as quantitative estimates, convergence, saturation results, localization, to name several. Additionally, the book discusses the perfect analogies between the probabilistic approaches of the classical Bernstein type operators and of the classical convolution operators (non-periodic and periodic cases), and the possibilistic approaches of the max-product variants of these operators. These approaches allow for two natural interpretations of the max-product Bernstein type operators and convolution type operators: firstly, as possibilistic expectations of some fuzzy variables, and secondly,...

  17. A regulator's perspective on NRC's participation in the operations ampersand maintenance committees

    International Nuclear Information System (INIS)

    Wessman, R.H.

    1996-01-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O ampersand M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O ampersand M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency's review of licensee actions involving the products that come from the efforts of the O ampersand M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future

  18. A regulator`s perspective on NRC`s participation in the operations & maintenance committees

    Energy Technology Data Exchange (ETDEWEB)

    Wessman, R.H.

    1996-12-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O&M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O&M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency`s review of licensee actions involving the products that come from the efforts of the O&M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future.

  19. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Atsushi, E-mail: shimizu.atsushi35@jaea.go.jp [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Kawamoto, Taiki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Tochio, Daisuke [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Takada, Shoji [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Shinozaki, Masayuki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan)

    2014-05-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established.

  20. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    International Nuclear Information System (INIS)

    Shimizu, Atsushi; Kawamoto, Taiki; Tochio, Daisuke; Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio; Takada, Shoji; Shinozaki, Masayuki

    2014-01-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established

  1. MOVES: A knowledge-based system for maintenance planning for motor-operated valves

    International Nuclear Information System (INIS)

    Winter, M.

    1987-01-01

    Over the past several years, knowledge-based expert systems have emerged as an important part of the general research area known as artificial intelligence. This paper describes a cooperative effort between faculty members at Iowa State University and engineers at the Duane Arnold Energy Center [a 545-MW(electric) boiling water reactor operated by Iowa Electric Light and Power Company] to explore the development of an advisory system for valve maintenance planning. This knowledge-based program, known as Motor-Operated Valves Expert System (MOVES), has a data base that currently includes safety-related motor-operated valves (∼117 valves). Valve maintenance was selected as the subject for the expert system because of the importance of valves in nuclear plant and their impact of plant availability. MOVES is being developed using the microcomputer-(IBM compatible) based expert system tool INSIGHT2+. The authors have found that the project benefits both the university and the utility

  2. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  3. Wind turbine blade life-time assessment model for preventive planning of operation and maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2014-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  4. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  5. Culture, Product Advertising, and Advertising Agency Operations ...

    African Journals Online (AJOL)

    Culture, Product Advertising, and Advertising Agency Operations. ... As a means of telling the market about a new product, advertising persuades and reminds the audience of their continuous support of the ... AJOL African Journals Online.

  6. Design of the system of maintenance operations occupational safety and health database application of nuclear power station

    International Nuclear Information System (INIS)

    Wang Xuehong; Li Xiangyang; Ye Yongjun

    2011-01-01

    Based on the KKS code of building equipment in nuclear power station, this paper introduces the method of establishing the system of maintenance operation occupational safety and health database application. Through the application system of maintenance occupational safety and health database, it can summarize systematically all kinds of maintenance operation dangerous factor of nuclear power station, and make a convenience for staff to learn the maintenance operation dangerous factors and the prevention measures, so that it can achieve the management concept of 'precaution crucial, continuous improvement' that advocated by OSHMS. (authors)

  7. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    International Nuclear Information System (INIS)

    Boessenkool, H.; Abbink, D.A.; Heemskerk, C.J.M.; Steinbuch, M.; Baar, M.R. de; Wildenbeest, J.G.W.; Ronden, D.; Koning, J.F.

    2013-01-01

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework

  8. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    Energy Technology Data Exchange (ETDEWEB)

    Boessenkool, H., E-mail: h.boessenkool@differ.nl [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Abbink, D.A. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Steinbuch, M. [Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Baar, M.R. de [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Wildenbeest, J.G.W. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Ronden, D. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands)

    2013-10-15

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework.

  9. Tables of Products of Tensor Operators and Stevens Operators

    DEFF Research Database (Denmark)

    Lindgård, Per-Anker

    1975-01-01

    Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given.......Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given....

  10. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  11. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  12. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  13. Markovian Study of Maintenance Practice in a Production Firm – A ...

    African Journals Online (AJOL)

    There are several reasons why maintenance managers need to ascertain, from time to time, the reliability profile of their production machines that are subject to constant use. This study furnishes the justifications by analyzing a 12-year maintenance data classified under machine time, downtime, idle time, running time, ...

  14. Towards a Risk-based Decision Support for Offshore Wind Turbine Installation and Operation & Maintenance

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard; Vatne, Sigrid Ringdalen

    2016-01-01

    Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration of installa......Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration...... of installation process, respectively. Duration, and therefore ship hiring costs is, among others, driven by waiting time for weather windows for weather-sensitive operations. Today, state of the art decision making criteria for weather-sensitive operations are restrictions to the significant wave height...... and the average wind velocity at reference height. However, actual limitations are physical, related to response of equipment used e.g. crane wire tension, rotor assembly motions while lifting, etc. Transition from weather condition limits to limits on physical equipment response in decision making would improve...

  15. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08

    International Nuclear Information System (INIS)

    Milosevic, D. and others

    1966-12-01

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report

  16. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  17. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    Science.gov (United States)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  18. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  19. The Development and Application of a Value-Driven Aircraft Maintenance Operations Performance Assessment Model combined with Real Options Analysis

    NARCIS (Netherlands)

    Goossens, H.G.; Beelaerts van Blokland, W.W.A.; Curran, R.

    2011-01-01

    This research paper presents the results from the development of an Aircraft Maintenance Operations Performance Assessment Model (AMOPAM). The AMOPAM is able to assess the differences in performance in between two different states or scenarios of aircraft maintenance operations and is able to

  20. 41 CFR 102-85.175 - Are the standard level services for cleaning, mechanical operation, and maintenance identified in...

    Science.gov (United States)

    2010-07-01

    ... services for cleaning, mechanical operation, and maintenance identified in an OA? 102-85.175 Section 102-85... of Service § 102-85.175 Are the standard level services for cleaning, mechanical operation, and maintenance identified in an OA? Unless specified otherwise in the OA, standard level services for cleaning...

  1. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  2. A test case of computer aided motion planning for nuclear maintenance operation

    International Nuclear Information System (INIS)

    Schmitzberger, E.; Bouchet, J.L.; Schmitzberger, E.

    2001-01-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  3. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Directory of Open Access Journals (Sweden)

    Xuejuan Liu

    2017-07-01

    Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  4. Basic principles of knowledge management and its application to the industrial company in tactical operations of maintenance and operational exploitation: A qualitative study

    Directory of Open Access Journals (Sweden)

    Francisco Javier Cárcel Carrasco

    2013-01-01

    Full Text Available Purpose: Although knowledge and its management is, and has been, studied in depth, particularly since the 90’s decade of the past century, especially for the strategic management, innovation, trade, or business administration, there are still many questions on how it articulates or transfers and the barriers to its management, especially when we talk about internal tactical activities that affect staff that we could call "offices", such as maintenance and industrial assembly or exploitation and conduction of the facilities. Because of the peculiarities normally seen in this kind of activity in the industrial companies, the knowledge of these people is strongly based on their experience (strong tacit component, difficult to measure and articulate, and on many occasions, however, this rupture of information-knowledge, can represent a high cost for the company (often assumed to be something inevitable due to the increase in production and service downtime, loss of efficiency, or tuning time of new staff to these areas.Design/methodology/approach: After a description of the State of the art and the basic principles of knowledge management, a qualitative study in an industrial company has been carried out, within the areas of operation and maintenance, in order to know the barriers and facilitators that such involved personnel finds in order to achieve an adequate transmission and use of that knowledge.Findings and Originality/value: Learn about barriers, facilitators and impact that offers the knowledge management in the areas of industrial maintenance, especially among professionals in offices which operate with a high degree of tacit knowledge and with a heavy dependence on the company on these professionals.Research limitations/implications: Those characteristics of a qualitative study in a particular area and within a geographical area, although it can be extrapolated to other types of companies and regional areas.Practical implications: Learn

  5. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    International Nuclear Information System (INIS)

    DALE, R.N.

    2000-01-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O and M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085

  6. Operational control and maintenance integrity of typical and atypical coil tube steam generating systems

    Energy Technology Data Exchange (ETDEWEB)

    Beardwood, E.S.

    1999-07-01

    Coil tube steam generators are low water volume to boiler horsepower (bhp) rating, rapid steaming units which occupy substantially less space per boiler horsepower than equivalent conventional tire tube and water tube boilers. These units can be retrofitted into existing steam systems with relative ease and are more efficient than the generators they replace. During the early 1970's they became a popular choice for steam generation in commercial, institutional and light to medium industrial applications. Although these boiler designs do not require skilled or certified operators, an appreciation for a number of the operational conditions that result in lower unscheduled maintenance, increased reliability and availability cycles would be beneficial to facility owners, managers, and operators. Conditions which afford lower operating and maintenance costs will be discussed from a practical point of view. An overview of boiler design and operation is also included. Pitfalls are provided for operational and idle conditions. Water treatment application, as well as steam system operations not conducive to maintaining long term system integrity; with resolutions, will be addressed.

  7. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    Energy Technology Data Exchange (ETDEWEB)

    DALE, R.N.

    2000-05-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

  8. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  9. Optimal mode of operation for biomass production

    NARCIS (Netherlands)

    Betlem, Ben H.L.; Roffel, Brian; Mulder, P.

    2002-01-01

    The rate of biomass production is optimised for a predefined feed exhaustion using the residue ratio as a degree of freedom. Three modes of operation are considered: continuous, repeated batch, and repeated fed-batch operation. By means of the Production Curve, the transition points of the optimal

  10. Computerization of operation and maintenance for nuclear power plants. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. The technical document is the result of a series of advisory and consultant meetings held by the IAEA in Vienna in 1991 - 1994. The document was prepared with the participation of experts from Canada, France, Germany, Hungary, Japan, Russia, Sweden, United Kingdom, and the United States. Refs, figs and tabs

  11. Fuel Rod Consolidation Project: Phase 2, Final report: Volume 5, Operations and maintenance manual

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this manual is to describe the function, installation, operation and maintenance of the Fuel Rod Consolidation System. This Document is preliminary and must be updated to incorporate any modifications to the mechanical and electrical systems that are performed during construction. Any changes and specific references related to the software requirements will be provided as the software is developed in Phase III. Setpoints related to equipment positions as a function of resolver and position transducer readings will also be provided in Phase III. References such as vendor supplied Operating and Maintenance Manuals for vendor components and assemblies are not available until a receipt of a purchase order. These references will become an integral part of this manual during the construction phase

  12. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Science.gov (United States)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  13. Implementation of utilities operation and maintenance experience into the European pressurized water reactor design

    International Nuclear Information System (INIS)

    Zaiss, W.; Lallier, M.

    1999-01-01

    Since 1992 Electricite de France EDF and German Utilities GU work together with Nuclear Power International NPI, a subsidiary of Framatome and Siemens, in the development of the future European Pressurized Water Reactor EPR. The EPR is an evolutionary concept, based on the French N4 plants and the German KONVOI plants. From the beginning, experienced operation and maintenance people from the precursor plants participate at the design process. Their experience will lead to a plant, which is not only characterised by low investment costs, but also by good operability, high availability and low operation and maintenance costs. No expensive back-fittings should be necessary after commissioning, to reach these availability and maintenance targets. The utility specialists give design requirements for outage performance, system design, and layout. These design requirements are really determining the system performances, and not what was design basis before. It does not necessarily lead to system increases. Mainly it is a shifting of the emphasis to other items. There are even cases, where the system performances can be reduced. Mostly very small modifications, which are nearly cost neutral when implemented early in the design, have big impact on the further operation. If there are big cost influences, a sound balance between investment and gained availability is made together with the designers. There is very fruitful discussion between designers and operators, which is highly estimated by both sides. In this frame also new, revolutionary ideas are coming up, which are going mostly in the direction of investment cost reduction, without loosing operation freedom. It is the first time in Europe, that designers and operators are working so close together. It is also the first time, that the management and the decision making is dominated by the utilities. (author)

  14. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  15. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    International Nuclear Information System (INIS)

    Guillon, A.; Lallier, M.

    1986-01-01

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  16. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  17. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  18. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    Energy Technology Data Exchange (ETDEWEB)

    Guillon, A.; Lallier, M. [Electricite de France - EDF, Service de la Production Thermique, 3 rue de Messine, 75384 Paris Cedex 08 (France)

    1986-02-15

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  19. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    JANIN, L.F.

    2000-01-01

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  20. CRITICAL FACTORS THAT LEAD TO GREEN BUILDING OPERATIONS AND MAINTENANCE PROBLEMS IN MALAYSIA

    OpenAIRE

    Izran Sarrazin MOHAMMAD; Nurul Nadiah ZAINOL; Shardy ABDULLAH; Neo Bee WOON; Nur Aqlima RAMLI

    2014-01-01

    The development of green buildings has become a trend in recent years in the effort to enhance the well-being of the community, environmental health, and life-cycle cost. However, many have argued that the complexities rendered by green buildings during the operational and maintenance phase often overshadow the benefits that can be gained through the development of green buildings. Several factors that lead to complexities in managing and maintaining green buildings have been highlighted by s...

  1. INEL experience and capabilities in design, operation, and maintenance of nuclear systems

    International Nuclear Information System (INIS)

    Leatham, J.; Masson, L.S.

    1982-07-01

    This study provides an overview of the experience, hardware, and managerial expertise available at the INEL for design, fabrication, and operation of tools and facilities for remote maintenance. The survey demonstrates that the INEL's fission reactor experience is directly applicable to the design of remote handling hardware which must be developed for fusion reactors, and that the experience and facilities are available at INEL to begin that work

  2. A HEDONIC APPROACH TO ESTIMATING OPERATION AND MAINTENANCE COSTS FOR NEW YORK MUNICIPAL WATER SYSTEMS

    OpenAIRE

    Schmit, Todd M.; Boisvert, Richard N.

    1997-01-01

    A hedonic cost function is used to isolate the operation and maintenance costs for water treatments. For small systems, costs are substantial for some technologies, but not for others. When regional differences in input costs are accounted for, small systems located in rural areas may have a cost advantage over similar systems closer to urban centers; however, costs of water treatment to meet Safe Drinking Water Act amendments may still be substantial.

  3. Estimating cost per lane mile for routine highway operations and maintenance

    Science.gov (United States)

    2011-01-01

    The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...

  4. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, D.; Churby, A.; Krieger, E.; Maloy, D.; White, K.

    2011-01-01

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance and Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  5. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  6. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  7. Remote Operation and Maintenance Demonstration Facility at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1986-01-01

    The Remote Operation and Maintenance Demonstration (ROMD) Facility at the Oak Ridge National Laboratory has been developed by the Consolidated Fuel Reprocessing Program to demonstrate remote handling concepts on advanced nuclear fuel reprocessing equipment and for other programs of national interest. The ROMD facility is a large-volume high-bay area that encloses a complete, technologically advanced remote maintenance system and full-scale development reprocessing equipment. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the US Department of Energy (DOE), the Power Reactor and Nuclear Fuels Development Corporation of Japan, the US Navy, and the National Aeronautics and Space Administration. Extensive tests of manipulative systems and remote maintainability of process equipment have been performed. This paper describes the ROMD facility and key remote maintenance equipment and presents a summary of major experimental activities. 7 refs., 6 figs

  8. Remotex: a new concept for efficient remote operation and maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Feldman, M.J.; White, J.R.

    1980-01-01

    Remotex is a concept of remote operation and maintenance that utilizes advanced manipulator design to improve plant operating efficiency, reduce personnel exposure, and improve safeguards and diversion resistance. It is a concept developed over the past two years in the conceptual design of the Hot Experimental Facility (HEF), a mechanically intense pilot plant facility designed to demonstrate reprocessng technology for early US breeder demonstration reactors. The Remotex concept is directly applicable to all segments of nuclear and nonnuclear industries where work tasks or conditions exist that are hazardous to the health of man

  9. Operation and maintenance of the RB reactor, Annual report for 1978

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1978-01-01

    The annual report for 1978 includes the following: utilization of the RB reactor; producing the new safety report; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Four annexes to this report are concerned with: operation of the reactor at higher power levels; performance of the instrumentation, radiation doses during operation; gamma radiation doses after reactor shutdown; properties of the neutron converter (optimization of the rector-converter coupling; maintenance of the reactor equipment; purchase of new equipment

  10. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  11. Operational health and physics service during the maintenance of the Australian National Medical Cyclotron

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1994-01-01

    Modern Medical Cyclotrons use intense beams of high energy protons or deuterons to produce large activities of short and medium lived radionuclides. After continuous operation for prolonged periods the Cyclotron components become activated through various nuclear interactions therefore, the risk of personal radiation hazard while handling such activated cyclotron components is high. This paper describes all operational aspects of the Health Physics service evolved during the first preventative maintenance program of the Australian National Medical Cyclotron, which took place in June 1993. 5 refs., 3 tabs., 2 figs

  12. Logistic optimization of maintenance management of pipeline network using operational research resources; Otimizacao logistica do gerenciamento de manutencoes na malha de gasodutos em operacao utilizando os recursos de pesquisa operacional

    Energy Technology Data Exchange (ETDEWEB)

    Madeira, Italo M [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Andrade, Gustavo C. de [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    A Gas pipeline system is operated typically loaded every time and requires a continuous maintenance plan to prevent or correct faults that can compromise the shipping and the delivery of the product. In this meaning, this paper describes how to provide more integration between the elements from the pipeline management logistics to do the scheduling tasks of maintenance using operational research resources. This tool intends to discover with an optimal result, the best days for each maintenance intervention in pipeline doing an economically distributed maintenance plan. (author)

  13. Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets

    Energy Technology Data Exchange (ETDEWEB)

    Chew, S.P.; Dunnett, S.J. [Department of Aeronautical and Automotive Engineering, Loughborough University, Loughborough, Leics (United Kingdom); Andrews, J.D. [Department of Aeronautical and Automotive Engineering, Loughborough University, Loughborough, Leics (United Kingdom)], E-mail: j.d.andrews@lboro.ac.uk

    2008-07-15

    A common scenario in engineering is that of a system which operates throughout several sequential and distinct periods of time, during which the modes and consequences of failure differ from one another. This type of operation is known as a phased mission, and for the mission to be a success the system must successfully operate throughout all of the phases. Examples include a rocket launch and an aeroplane flight. Component or sub-system failures may occur at any time during the mission, yet not affect the system performance until the phase in which their condition is critical. This may mean that the transition from one phase to the next is a critical event that leads to phase and mission failure, with the root cause being a component failure in a previous phase. A series of phased missions with no maintenance may be considered as a maintenance-free operating period (MFOP). This paper describes the use of a Petri net (PN) to model the reliability of the MFOP and phased missions scenario. The model uses Monte-Carlo simulation to obtain its results, and due to the modelling power of PNs, can consider complexities such as component failure rate interdependencies and mission abandonment. The model operates three different types of PN which interact to provide the overall system reliability modelling. The model is demonstrated and validated by considering two simple examples that can be solved analytically.

  14. Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets

    International Nuclear Information System (INIS)

    Chew, S.P.; Dunnett, S.J.; Andrews, J.D.

    2008-01-01

    A common scenario in engineering is that of a system which operates throughout several sequential and distinct periods of time, during which the modes and consequences of failure differ from one another. This type of operation is known as a phased mission, and for the mission to be a success the system must successfully operate throughout all of the phases. Examples include a rocket launch and an aeroplane flight. Component or sub-system failures may occur at any time during the mission, yet not affect the system performance until the phase in which their condition is critical. This may mean that the transition from one phase to the next is a critical event that leads to phase and mission failure, with the root cause being a component failure in a previous phase. A series of phased missions with no maintenance may be considered as a maintenance-free operating period (MFOP). This paper describes the use of a Petri net (PN) to model the reliability of the MFOP and phased missions scenario. The model uses Monte-Carlo simulation to obtain its results, and due to the modelling power of PNs, can consider complexities such as component failure rate interdependencies and mission abandonment. The model operates three different types of PN which interact to provide the overall system reliability modelling. The model is demonstrated and validated by considering two simple examples that can be solved analytically

  15. Joint Optimization of Economic Production Quantity and Preventive Maintenance with Considering Multi-Products and Reserve Time

    OpenAIRE

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cy...

  16. The System 80+ standard plant design reduces operations and maintenance costs

    International Nuclear Information System (INIS)

    Chari, D.R.; Robertson, J.E.

    1998-01-01

    To be cost-competitive, nuclear power plants must maximize plant availability and minimize operations and maintenance (O and M) costs. A plant whose design supports these goals will generate more power at less cost and thereby have a lower unit generating cost. The ABB Combustion Engineering Nuclear Systems (ABB-CE) System 80+ Standard Nuclear Power Plant, rated at 1400 megawatts electric (MWe), is designed for high availability at reduced cost. To demonstrate that the duration of refueling outages, the major contributor to plant unavailability, can be shortened, ABB-CE developed a detailed plan that shows a System 80+ plant can safely perform a refueling and maintenance outage in 18 days. This is a significant reduction from the average current U.S. plant outages of 45 days, and is possible due to a two-part outage strategy: use System 80+ advanced system design features and relaxed technical specification (TS) time limits to shift some maintenance from outages to operating periods: and, use System 80+ structural, system, and component features, such as the larger operating floor, permanent pool seal, integral reactor head area cable tray system and missile shield, and longer life reactor coolant pump seals, to reduce the scope and duration of outage maintenance activities. Plant staffing level is the major variable, or controllable contributor to operations costs. ABB-CE worked with the Institute of Nuclear Power Operations (INPO) to perform detailed staffing analyses that show a System 80+ plant can be operated reliably with 30 percent less staff than currently operating nuclear plants of similar size. Safety was not sacrificed when ABB-CE developed the System 80+ refueling outage plan and staffing level. The outage plan was developed utilizing a defense-in-depth concept for shutdown safety. The defense in-depth concept is implemented via systematic control of outage risk evaluation (SCORE) cards. The SCORE cards identify primary and alternate means of

  17. The operation and maintenance of the SLAR system at Bruce A

    Energy Technology Data Exchange (ETDEWEB)

    Ahuja, S [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1997-12-31

    The SLAR (Spacer Location And Repositioning) system at Bruce A consists of two (2) Delivery Machines and a Fuelling Machine Trolley equipped with the D{sub 2}0 and Air auxiliary systems. The Delivery Machines are designed to perform all the Fuelling Machine operations and have the capability to rapidly defuel/refuel a reactor channel and traverse the SLAR tool to locate and reposition the spacers in the channel. The number of functions that a Delivery Machine must perform makes it more complex as compared to the operations of a Fuelling Machine. The paper discusses the operation of the SLAR Delivery Machines and the problems encountered with the operation and maintenance of this system at Bruce A. (author). 8 figs.

  18. Operation and maintenance of the RB reactor, Annual report for 1976

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1976-01-01

    Due to its flexibility and relatively simple construction the RB reactor enabled direct measurements of a series of physical parameters. During 1976 the reactor operation exceeded the plan due to preparation of special experiments planned for the next period. It is planned to operate the reactor at higher power levels (50 W - 10 kw). A need for increasing the neutron flux a neutron converter was built in 1976. preliminary measurements showed that placing the neutron converter next to the reactor vessel enables achievement of irradiation and dosimetry measurements in the fast neutron flux. It is planned to purchase highly enriched fuel for the neutron converter. This annual report includes 5 Annexes with data concerning: operation, irradiation field around the RB reactor, maintenance of reactor components and instrumentation, purchase of new equipment, and the program for training reactor operators

  19. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  20. An operator training simulator based on interactive virtual teleoperation: nuclear facilities maintenance applications

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Seung Ho

    1997-01-01

    Remote manipulation in nuclear hazardous environment is very often complex and difficult to operate and requires excessively careful preparation. Remote slave manipulators for unstructured work are manually controlled by a human operator. Small errors made by the operator via the master manipulator during operation can cause the slave to be surffered from excessive forces and result in considerable damages to the slave iteself and its environment. In this paper, we present a prototype of an operator training simulator for use in nuclear facilities maintenance applications, as part of the ongoing Nuclear Robotics Development Program at Korea Atomic Energy Research Institute (KAERI). The operator training simulator provides a means by which, in virtual task simulation, the operator can try out and train for expected remote tasks that the real slave manipulator will perform in advance. The operator interacts with both the virtual slave and task environment through the real master. Virtual interaction force feedback is provided to the operator. We also describe a man-in-the loop control scheme to realize bilateral force reflection in virtual teleoperation

  1. Computer systems in the operation, maintenance and technical support of Loviisa NPS

    International Nuclear Information System (INIS)

    Tiitinen, M.

    1993-01-01

    A description is given of how the Loviisa nuclear power plant has utilized computers in many ways in the operation, maintenance, technical support and in other functions at the plant. The evolution of the computer system can be divided into the following phases: plant commissioning (1975-80), maintenance systems development (1981-84), second generation systems take-over (1985-90) and workstation client/server systems and PC's proliferation (1991->). A short description is given of the main systems at the Loviisa plant using computers, i.e. process computer systems, the plant information system, training simulator, vibration monitoring, laboratory computer systems, PC and workstation applications. (Z.S.) 4 refs

  2. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , and to sequential optimal decision making on planning of OM taking into account new information. Deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially......For offshore wind turbines, costs to operation and maintenance (OM) are substantial. This paper describes a risk-based life cycle approach for optimal planning of OM. The approach is based on pre-posterior Bayesian decision theory, and can be used both to overall, initial planning of OM...... in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  3. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  4. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  5. Agricultural Productivity, Co-Operatives and Organisational ...

    African Journals Online (AJOL)

    Huria: Journal of the Open University of Tanzania ... can enhance productivity and increase farmers' income by bringing financial services closer. ... of Kimuli Agricultural Marketing Co-operative Society (AMCOS) and Muungano Savings and ...

  6. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  7. Radiological investigation in the boiler's maintenance operations in a Coal-Fired power plant

    International Nuclear Information System (INIS)

    Robles, Beatriz; Mora, Juan C.; Cancio, David; Baeza, Antonio; Corbacho, Jose A.

    2008-01-01

    As part of a study being performed in the four biggest coal-fired power plants in Spain, the formation of scales of radioisotopes in parts of the heat recovery system was investigated. This effect should be more important in the case of 210 Po and 210 Pb. Thereby, it is likely in given specific chemical conditions that scales could be formed with a high concentration of 210 Pb, probably in secular equilibrium with 210 Po and 210 Bi. Those scales could reach activity concentrations of some hundreds of Bq g -1 . In order to study within the boiler this scale formation, an investigation during the maintenance operations programmed in the 'Compostilla' coal-fired power plant (Ponferrada-Spain) was carried out. Those operations are performed each 2-3 years and last for around 30 or 40 days. Measurements of ambient dose equivalent (H * (10)) in the boiler before and after the entrance of the operators, together with beta surface contamination on the bottom ashes attached in the walls and on the tubes, were performed. The last measurements were carried out for screening purposes in order to select those areas on the tubes which could present Po scales. Even if chemical conditions are in general oxidising within the boiler, since conditions are not homogeneous, some zones were localized in which surface contamination was measured. In these spots, samples were collected and then measured in the laboratory. Moreover, an analysis of maintenance tasks, used personal protection equipment, working times and other important parameters was also carried out. This analysis is important in order to perform radiological evaluations, as realistic as possible, of the effective doses that could be received by maintenance operators. In the present study, the values of the measurements performed and the results of the assessment of the effective doses for the workers are presented. (author)

  8. EVALUASI KINERJA KEGIATAN PERAWATAN MESIN INJECTION MOLD MENGGUNAKAN METODE TOTAL PRODUCTIVE MAINTENANCE (TPM PADA PT ICHIKOH INDONESIA

    Directory of Open Access Journals (Sweden)

    M. Tirtana Siregar

    2017-12-01

    Full Text Available Penelitian ini bertujuan untuk memberikan gambaran deskriptif mengenai perawatan mesin atau maintenance, meliputi Total Productive Maintenance, Overall Equipment Effectiveness, Overall Human Ineffectiveness dan Six Big Losses pada PT Ichikoh Indonesia. Permasalahan yang terjadi diperusahaan yaitu banyaknya jumlah part defect dikarenakan mesin sering breakdown. Pengumpulan data dilakukan dengan observasi dan wawancara terstruktur dengan Manager Departement Molding Upstream 1 dan Departement Maintenance. Data tersebut dianalisis menggunakan metode kuantitatif dan evaluatif dari periode bulan April 2016 sampai Maret 2017. Dari hasil analisis ini PT Ichikoh Indonesia memiliki nilai efektifitas mesin yang masih dibawah standar JIPM (Japan Institude of Plant Maintenance yaitu dengan nilai tertinggi pada bulan Februari 74%, sedangkan standar JIPM (Japan Institude of Plant Maintenance adalah minimal sebesar 85% yang dihitung menggunakan metode Overall Equipment Effectiveness. Sedangkan untuk pengukuran tingkat ketidakefektifan kerja operator yang dianalisis menggunakan metode Overall Human Ineffectiveness mendapatkan nilai yang masih besar pada bulan May 2016 yaitu sebesar 17%.  Faktor yang menyebabkan rendahnya nilai efektifitas mesin dan tingkat ketidakefektifan kinerja operator adalah faktor Idling and Minor Stoppagges dengan nilai losses sebesar 54% yang sudah dianalisis menggunakan diagram pareto. Sesuai dengan diagram sebab-akibat (fishbone didapat faktor-faktor yang menyebabkan terjadinya Idling and Minor Stoppagges yang menjadi prioritas utama adalah a. faktor manusia yaitu masih kurang disiplin, sering terjadi kesalahan dalam perbaikan mesin, b. faktor material yaitu kesalahan spesifikasi material dan rendahnya perawatan bahan baku, c. faktor mesin yaitu mesin sering breakdown, kesalahan setup, d. faktor metode yaitu penjadwalan pengganti komponen yang belum efektif dan autonomous maintenance kurang berjalan dengan baik, e. faktor lingkungan

  9. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  10. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xuejuan; Wang, Binrong

    2017-07-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  11. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  12. Operations and Maintenance Manual for the Temporary Septic Holding Tank at the 100-C Remedial Action Restroom Facility

    International Nuclear Information System (INIS)

    Palmquist, C.A.

    1997-11-01

    The purpose of this document is to provide detailed information regarding the operations and maintenance of the septic holding tank system at the 100-C Remedial Action Restroom Facility. Specific information provided in this document includes the type and frequency of required maintenance and failure response procedures

  13. Operations and Maintenance Manual for the Temporary Septic Holding Tank at the 100-C Remedial Action Support Facility

    International Nuclear Information System (INIS)

    Palmquist, C.A.

    1997-12-01

    The purpose of this document is to provide detailed information regarding the operations and maintenance of the septic holding tank system at the 100-C Remedial Action Restroom Facility. Specific information provided in this document includes the type and frequency of required maintenance and failure response procedures

  14. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance of records for urban bus... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal...

  15. Human factors interventions to reduce human errors and improve productivity in maintenance tasks

    International Nuclear Information System (INIS)

    Isoda, Hachiro; Yasutake, J.Y.

    1992-01-01

    This paper describes work in progress to develop interventions to reduce human errors and increase maintenance productivity in nuclear power plants. The effort is part of a two-phased Human Factors research program being conducted jointly by the Central Research Institute of Electric Power Industry (CRIEPI) in Japan and the Electric Power Research Institute (EPRI) in the United States. The overall objective of this joint research program is to identify critical maintenance tasks and to develop, implement and evaluate interventions which have high potential for reducing human errors or increasing maintenance productivity. As a result of the Phase 1 effort, ten critical maintenance tasks were identified. For these tasks, over 25 candidate interventions were identified for potential development. After careful analysis, seven interventions were selected for development during Phase 2. This paper describes the methodology used to analyze and identify the most critical tasks, the process of identifying and developing selected interventions and some of the initial results. (author)

  16. Use of natural products for oral hygiene maintenance: revisiting traditional medicine.

    Science.gov (United States)

    Gupta, Pankaj; Shetty, Heeresh

    2018-03-27

    The use of traditional means of oral hygiene maintenance has a long-recorded history, with widespread usage in rural areas of Africa, South America and the Indian subcontinent till date. Though dental healthcare professionals and the general population, especially in the urban areas can have the temptation of out-rightly rejecting them as ineffective, the usage of these natural products is based on time-tested scientific principles. The present article provides an overview of the major traditional practices of oral hygiene maintenance and how they compare against the modern-day armamentarium of oral hygiene maintenance.

  17. 7S’s System Foundation of Total Productive Maintenance House for Lean Organization

    Directory of Open Access Journals (Sweden)

    Georgescu Daniel

    2009-12-01

    Full Text Available The goal of Lean TPM or TPM for lean organization approach is maintaining international competitiveness . This Lean TPM from our article, approach proposes tree additions to the current understanding of the TPM system: the 7Ss as a critical first step in any improvement program; instant maintenance; improvement setup operations. A company cannot make business gains solely by using cost-cutting measures because it cannot cost enough to become a world-class competitor. Instead, it must invest resources in productivity improvement. This generally increases factory throughput and cuts costs at the same time. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind TPM. The main objective of the 7S system is to grow the value added to each worker. To grow the added value, we must create ordered and well adjusted production lines based on the principles of the 7S’s: organization and order. Above all these two S’s bring to the factory standard positions and acknowledgement. Focus on the first two S’s brings a new perspective on understanding the 7S’s.

  18. Segmenting health maintenance organizations to study productivity and profitability.

    Science.gov (United States)

    Sobol, M G

    2000-01-01

    As the decade ended, health maintenance organizations (HMOs) were increasing in popularity as a means of health care delivery. These groups take many forms, so it is important for the analyst to see if the efficiency and financial results for these different forms vary. The four major forms are profit vs. not-for-profit, chain vs. non-chain, group/staff vs. individual practice association (IPA), and federally qualified vs. non-federally qualified. Using a nationwide database of all the HMOs in the United States, the article compares liquidity rates, leverage ratios, profitability ratios, marketing, and per member ratios across the four groups using paired t tests. The two classifications that showed the most differences were group/staff vs. IPA and federally qualified vs. non-federally qualified. IPAs have a better liquidity position and lower leverage ratios than group/staff but their administrative costs are higher and the time to receive payments and to pay debts is higher. Non-federally qualified have somewhat higher liquidity ratios and higher profitability ratios. These significant differences in financial outcomes indicate that studies of HMOs should segment different major forms of organizations and study them separately before trying to show the effects of different policies on HMO efficiency and effectiveness.

  19. Status and trends in the development of Total Productive Maintenance (TPM) - a review of international articles

    DEFF Research Database (Denmark)

    Andreassen, Mads; Gertsen, Frank; Christiansen, Thomas Bøhm

    2004-01-01

    Corporate continuous innovation efforts are often guided by (more or less) customized standard management concepts such as "TQM", "BPR" or "Lean". The focus of this article, Total Productive Maintenance (TPM), is a contemporary example of such a concept. Although the concept first appeared more...... maintenance and high efficiency of the production facilities. However, during the last ten years, the concepthas been developed into a company wide (management)concept, also compromising efficiency in the administrative part of a company, safety and environmental aspects, as well as product quality. Based...

  20. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L.R.; Judd, R.A.; MacBeth, M.J.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection; AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve operational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; and plant display system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance

  1. The Development of Plant Maintenance Scheduling Via lnventory System for Sustainable Plant Operation

    Directory of Open Access Journals (Sweden)

    Masripan Roslizan

    2016-01-01

    Full Text Available Industrial sector becomes the main concern for developing country. By the time, it was increased rapidly. However, there are many problems observed such as maintenance scheduling, stock inventory and supply chain. Therefore, this research develops new inventory system to develop sustainable plant operation with a high capability to plant operation especially to stock inventory of machine component. In also required green application with minimised used on paper. This system is developed using Radio Frequency Identification (RFID for inventory control which integrated with web-based system. This system consists of several modules such as station module, item module and item request module and report of critical stock in the store. This system can be controlled from a hand-phone with internet connection or automatic alert such as Short Massage Send (SMS and email. The developed system is very effective in monitoring the stock material through the barcode, supply chain and worker performance as well as to reduce the lead time for maintenance activities of the company through sustainable plant operation.

  2. Application of integrated logistic techniques to operation, maintenance and re engineering processes in Nuclear Power plants

    International Nuclear Information System (INIS)

    Santiago Diez, P.

    1997-01-01

    This paper addresses the advisability of adapting and applying management and Integrated Logistic engineering techniques to nuclear power plants instead of using more traditional maintenance management methods. It establishes a historical framework showing the origins of integrated approaches based on traditional logistic support concepts, their phases and the real results obtained in the aeronautic world where they originated. It reviews the application of integrated management philosophy, and logistic support and engineering analysis techniques regarding Availability, Reliability and Maintainability (ARM) and shows their inter dependencies in different phases of the system's life (Design, Development and Operation). It describes how these techniques are applied to nuclear power plant operation, their impact on plant availability and the optimisation of maintenance and replacement plans. The paper analyses the need for data (type and volume), which will have to be collected, and the different tools to manage such data. It examines the different CALS tools developed by EA for engineering and for logistic management. It also explains the possibility of using these tools for process and data operations through the INTERNET. It also focuses on the qualities of some simple examples of possible applications, and how they would be used in the framework of Integrated Logistic Support (ILS). (Author)

  3. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  4. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  5. Analysis operating and maintenance cost of Danish wind turbines in 1993

    International Nuclear Information System (INIS)

    Godtfredsen, F.

    1994-10-01

    A study of operation and maintenance (O and M) cost of Danish wind turbines has been carried out. The study is based on a questionnaire survey by the wind turbine owners association. The study shows a significant decline in the O and M cost from 55 kW machines installed in 1980-87 to modern machines. In 1993, the average total O and M cost for 55 kW and 150 kW turbines was approximately 0.22 DKK/kWh and 0.07 DKK/kWh, respectively. For 150 kW turbines, insurance and administration costs amounted to 0.04 DKK/kWh while repair and maintenance costs came to 0.03 DKK/kWh. In 1993, repair and maintenance cost were significantly higher for older vintages of 55 kW and 150 kW turbines, but it is not possible based on this study to conclude whether increasing O and M costs generally comes with increasing age. The statistical basis of this study is not large enough to conclude whether there are positive scale effects for ST's from 105 kW. Similarly, because of relatively few large WT are older than 10 years, it is not possible based on this study to predict the size of major future repair costs/reinvestments. To estimate the O and M costs more exactly, a larger empirical basis is needed. (au) (8 tabs., 17 ills., 11 refs.)

  6. Risk-Based Operation and Maintenance of Offshore Wind Turbines using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    the lifetime. Two different approaches are used; one uses a threshold value of the failure probability, and one uses a Limited Memory Influence Diagram. Both methods are tested for an application example using MonteCarlo sampling, and they are both found to be efficient and equally good.......For offshore wind farms, the costs due to operation and maintenance are large, and more optimal planning has the potential of reducing these costs. This paper presents how Bayesian networks can be used for risk-based inspection planning, where the inspection plans are updated each year through...

  7. The influence of stakeholder groups in operation and maintenance services of offshore wind farms

    DEFF Research Database (Denmark)

    Ahsan, Dewan; Pedersen, Søren

    2018-01-01

    One of the prime challenges in offshore wind is to manage and coordinate with the various stakeholders involved in the operation and maintenance (O&M) phase. Therefore the aims of this paper are: i) to map the stakeholder groups involved in O&M of Offshore Wind Farm (OWF), ii) to assess...... the identified stakeholder group's interest and power to influence O&M, iii) to evaluate the relationship between different stakeholder groups and iv) to highlight potential strategies to manage the stakeholder groups. In this article, the stakeholder analysis approach is used. The results reveal that eleven key...

  8. Operation and maintenance of spent fuel storage and transportation casks/containers

    International Nuclear Information System (INIS)

    2007-01-01

    Member States have a growing need for casks for spent fuel storage and transportation. A variety of casks has been developed and is in use at an increasing number of sites. This has resulted in an accumulation of experience that will provide valuable information for other projects in spent fuel management. This publication provides a comprehensive review of information on the cask operation and maintenance associated with spent fuel storage. It draws upon generic knowledge from industrial experience and applications and is intended to serve as a basis for better planning and implementation in future projects

  9. Precursor Report of Data Needs and Recommended Practices for PV Plant Availability Operations and Maintenance Reporting.

    Energy Technology Data Exchange (ETDEWEB)

    Hill, Roger R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Balfour, John R. [High Performance PV, Phoenix, AZ (United States)

    2015-01-01

    Characterizing the factors that affect reliability of a photovoltaic (PV) power plant is an important aspect of optimal asset management. This document describes the many factors that affect operation and maintenance (O&M) of a PV plant, identifies the data necessary to quantify those factors, and describes how data might be used by O&M service providers and others in the PV industry. This document lays out data needs from perspectives of reliability, availability, and key performance indicators and is intended to be a precursor for standardizing terminology and data reporting, which will improve data sharing, analysis, and ultimately PV plant performance.

  10. Operation and maintenance of the RB reactor, Annual report for 1980

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Markovic, H.; Zivkovic, B.; Gogdanovic, M.; Petronijevic, M.

    1980-12-01

    This report includes data concerned with reactor operation and utilization, status of reactor components and equipment, refurbishment of the equipment, dosimetry and radiation protection, reactor staff, financing. It includes 9 Annexes as follows: Utilization of the RB reactor from 1976 - 1980; program of reactor utilization from 1981-1985; contents of the RB reactor safety report; maintenance of the reactor components and equipment in 1980; verification of reactor reliability after the earthquake (May 18 1980); refurbishment of equipment in 1980, and purchasing new equipment from 1981-1985; review of radiation doses in the reactor building and exposure doses for the reactor staff; personnel data and financial data

  11. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    Energy Technology Data Exchange (ETDEWEB)

    Maples, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); van de Pietermen, R. [Energy Research Center of the Netherlands (Netherlands); Obdam, T. [Energy Research Center of the Netherlands (Netherlands)

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  12. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  13. High Level Waste plant operation and maintenance concepts. Final report, March 27, 1995

    International Nuclear Information System (INIS)

    Janicek, G.P.

    1995-01-01

    The study reviews and evaluates worldwide High Level Waste (HLW) vitrification operating and maintenance (O ampersand M) philosophies, plant design concepts, and lessons learned with an aim towards developing O ampersand M recommendations for either, similar implementation or further consideration in a HLW vitrification facility at Hanford. The study includes a qualitative assessment of alternative concepts for a variety of plant and process systems and subsystems germane to HLW vitrification, such as, feed materials handling, melter configuration, glass form, canister handling, failed equipment handling, waste handling, and process control. Concept evaluations and recommendations consider impacts to Capital Cost, O ampersand M Cost, ALARA, Availability, and Reliability

  14. Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

    Science.gov (United States)

    Applegate, Joseph L.

    2014-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  15. Research on operation and maintenance support system adaptive to human recognition and understanding in human-centered plant

    International Nuclear Information System (INIS)

    Numano, Masayoshi; Matsuoka, Takeshi; Mitomo, N.

    2004-01-01

    As a human-centered plant, advanced nuclear power plant needs appropriate role sharing between human and mobile intelligent agents. Human-machine cooperation for plant operation and maintenance activities is also required with an advanced interface. Plant's maintenance is programmed using mobile robots working under the radiation environments instead of human beings. Operation and maintenance support system adaptive to human recognition and understanding should be developed to establish adequate human and machine interface so as to induce human capabilities to the full and enable human to take responsibility for plan's operation. Plant's operation and maintenance can be cooperative activities between human and intelligent automonous agents having surveillance and control functions. Infrastructure of multi-agent simulation system for the support system has been investigated and developed based on work plans derived from the scheduler. (T. Tanaka)

  16. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  17. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    DEFF Research Database (Denmark)

    Meibom, Peter; Weber, C.; Barth, R.

    2009-01-01

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start......-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing...... the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward...

  18. New GREEN Products for the Military Aviation Maintenance Community

    Science.gov (United States)

    2012-05-01

    cont‘d. MIL-DTL-81706 type II chrome -free pre-treatment applicator pen • Existing products qualified only with hexavalent chromium • Now...have environmentally friendly non- hexavalent chromium • Working on establishing NSN and up-dating PQD WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE

  19. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-02-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  20. Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: A case study

    Science.gov (United States)

    Martomo, Zenithia Intan; Laksono, Pringgo Widyo

    2018-02-01

    In improving the productivity of the machine, the management of the decision or maintenance policy must be appropriate. In Spinning II unit at PT Apac Inti Corpora, there are 124 ring frame machines that often have breakdown and cause a high downtime so that the production target is not achieved, so this research was conducted on the ring frame machine. This study aims to measure the value of equipment effectiveness, find the root cause of the problem and provide suggestions for improvement. This research begins with measuring the achievement of overall equipment effectiveness (OEE) value, then identifying the six big losses that occur. The results show that the average value of OEE in the ring frame machine is 79.96%, the effectiveness value is quite low because the standard of OEE value for world class company ideally is 85%. The biggest factor that influences the low value of OEE is performance rate with percentage factor six big losses at reduced speed losses of 17.303% of all time loss. Proposed improvement actions are the application of autonomous maintenance, providing training for operators and maintenance technicians and supervising operators in the workplace.

  1. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Science.gov (United States)

    2010-04-01

    ... costs needed for the reliable operation of the irrigation facility infrastructure; (8) Maintenance of a... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA determine the annual operation and... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...

  2. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  3. IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA

    Directory of Open Access Journals (Sweden)

    Ronald E. Stok

    2001-01-01

    Full Text Available The effectivity improvement of production facility in factory is not only on facility manitenance but also on human resources. Total Productive Maintenance (TPM gives an optimal solution to effectivity improvement. A case study of TPM implementation have done in non sewing department of PT Kerta Rajasa Raya. Abstract in Bahasa Indonesia : Peningkatan efektivitas dari fasilitas produksi di suatu perusahaan bukan hanya terbatas pada perawatan fasilitas kerja saja tetapi juga sumber daya manusia. Total Productive Maintenance (TPM memberikan suatu solusi optimal terhadap peningkatan efektivitas dengan melibatkan semua sumber daya manusia yang bertanggung jawab terhadap fasilitas produksi. Suatu studi kasus terhadap pengimplementasian TPM dilakukan di departemen non jahit PT. Kerta Rajasa Raya. Kata kunci : TPM, MTTF, Autonomous Maintenance.

  4. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L. R.; Judd, R. A.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection. AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Five key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve cooperational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; plant display system; and digital protection system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance. (author). 8 refs., 3 figs

  5. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    Science.gov (United States)

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  6. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  7. Operational experience and maintenance programs of Transamerica Delaval, Inc., diesel generators

    International Nuclear Information System (INIS)

    Rajan, J.R.

    1994-05-01

    Concerns regarding the reliability of large-bore, medium-speed diesel generators manufactured by Transamerica Delaval, Inc. (TDI) for application at domestic nuclear plants were first prompted by a crankshaft failure at Shoreham Nuclear Power Station in August 1983. A number of diesel generator components were identified which had potential deficiencies from a manufacturing and operational standpoint. In response to these problems, 11 (now 8) U.S. nuclear utility owners formed a TDI Diesel Generator Owners Group (Owners Group) to address operational and regulatory issues relative to diesel generator sets used for standby emergency power. The Owners' Group performed extensive design reviews of all key engine components and developed recommendations to be implemented by the individual owners concerning needed component replacements and modifications, component inspections to validate the open-quotes as-manufacturedclose quotes and open-quotes as-assembledclose quotes quality of key engine components, engine testing, and an enhanced maintenance and surveillance program

  8. The Expert System For Safety Assesment Of Kartini Reactor Operation And Maintenance

    International Nuclear Information System (INIS)

    Syarip

    2000-01-01

    An expert system for safety assessment of Kartini reactor operation and maintenance based on fuzzy logic method has been made. The expert system is developed from the Fuzzy Expert System Tools (FEST), i.e. by developing the knowledge base and data base files of Kartini research reactor system and operations with an inference engine based on FEST. The knowledge base is represented in the procedural knowledge as heuristic rules or generally known as rule-base in the from of If-then rule. The fuzzy inference process and the conclusion of the rule is done by FEST based on direct chaining method with interactive as well as non-interactive modes. The safety assessment of Kartini reactor based on this method gives more realistic value than the conventional method or binary logic

  9. Analysis of failure and maintenance experiences of motor operated valves in a Finnish nuclear power plant

    International Nuclear Information System (INIS)

    Simola, K.; Laakso, K.

    1992-01-01

    Operating experiences from 1981 up to 1989 of totally 104 motor operated closing valves (MOV) in different safety systems at TVO I and II nuclear power units were analysed in a systematic way. The qualitative methods used were failure mode and effects analysis (FMEA) and maintenance effects and criticality analysis (MECA). The failure descriptions were obtained from power plant's computerized failure reporting system. The reported 181 failure events were reanalysed and sorted according to specific classifications developed for the MOV function. Filled FMEA and MECA sheets on individual valves were stored in a microcomputer data base for further analyses. Analyses were performed for the failed mechanical and electrical valve parts, ways of detection of failure modes, failure effects, and repair and unavailability times

  10. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  11. Paper on operation and maintenance experiences on radiation monitoring instrumentation at NAPS

    International Nuclear Information System (INIS)

    Gupta, J.P.; Vinod Kumar; Sen, S.K.; Malhotra, S.

    2005-01-01

    Narora Atomic Power Station (NAPS) is the first standardized Pressurised Heavy Water Reactor in India commissioned in the year 1989. Many new Radiation Monitoring Systems like Portal Monitors and Ventilation Exhaust Activity Monitors were first time introduced at NAPS. All the Personnel Contamination Monitors and Area Radiation Monitors used at NAPS were designed and developed by Electronics Division, BARC. Only the Portal Monitor was supplied by M/S Herfurth, Germany. The paper highlights the operation and maintenance experiences on Radiation Monitoring Instrumentation at NAPS in the last 15 years of operation. The paper also highlights the different problems faced in Radiation Instruments and our suggestions for improvement in their design for their better availability and long term reliability. (author)

  12. Operating experience and maintenance at the TRIGA Mark II LENA reactor

    International Nuclear Information System (INIS)

    Cingoli, F.; Meloni, S.; Alloni, L.

    1986-01-01

    A summary of reactor operation and maintenance in the time period 1982-1986 is presented and discussed. Some problems occurred from instrumentated aluminum cladded elements. Both of them presented damage in the cable tubes and one element showed a protuberance in the cladding. They were replaced with stainless - steel cladded ones. Both elements were sealed up in stainless - steel tubes and put away in wells, 3 meters deep, in the reactor room floor. Some minor problems, correlated to the quite aid instrumentation of the console, are reported. The reactor activity in the last four years was conditioned by the developing of the n - n-bar oscillation NADIR experiment. The thermal column was dismantled and rebuilt in consideration of the Nadir experiment necessities and this job is described in detail. The building containing, the target and the void pipe, presented in 1982 Conference, are now completely operating and the experiment is running. (author)

  13. Quality assurance/quality control training for plant operation and maintenance

    International Nuclear Information System (INIS)

    Bergbauer, A.K.

    1986-01-01

    One of the most important tasks during the period of plant operation is to ensure the effectiveness of the information links inside the utility and the nuclear industry. To make use of all information, experience and knowledge as well as to make sure that instructions are followed, it is necessary to provide rules, instructions and training for all people involved. QA/QC-training for plant operation and maintenance must deliver a consciousness of men in a way that e.g. instructions or procedures are followed strictly, the management is informed about deviations and mistakes, alterations are carried out with approval only, safety systems are kept integer all the time and interfaces are linked together properly. By means of examples about staff organization, control room and shift rules, work permit procedures and use of an information feedback system QA measures shall be demonstrated. (orig.)

  14. Plant design and layout of the different buildings with respect to safety, operational and maintenance requirements

    International Nuclear Information System (INIS)

    Linder, C.

    1981-01-01

    Design and layout of the buildings of a nuclear power plant are governed by the safety requirements regarding nearby population as called for by government regulations as well as by operational and maintenance requirements called for by the power utilities in order to assure smooth operation and easy service conditions. The lecture will focus on the different functional circumstances to be considered, their relative importance, criteria to be applied, pertinent regulations etc. and also give examples on the solutions to the above requirements. Main topics to be covered will be those circumstances that impose the highest demands on the civil engineering layout and design: airplane impact, earthquake, loss of coolant accident, pipe whipping, fuel cask transfer, annual overhaul, leak detection etc. (orig./RW)

  15. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  16. Plant life management. An integral part of operation and maintenance policy

    International Nuclear Information System (INIS)

    Faidy, C.; Hutin, J.-P.

    2002-01-01

    Electricite de France is now operating 58 PWR nuclear power plants that produce 75% of electricity in France. Besides maintaining safety and availability on a routine basis, it is outmost important to protect the investment. That is the reason why EDF is devoting important resources to implement ageing management concern as an integral part of operation and maintenance programs (for example through appropriate data collection and analysis, specific repair and replacement projects and important anticipation efforts, taking in account the high level of standardisation of the units). A particular organisation has been set up to continuously observe and analyse all activities so as to make sure that ageing concern is correctly taken in account in strategies and that no decisions are susceptible to impair plant lifetime. This 'lifetime program' is paying attention to technical issues associated with main components but is also dealing with issues related to economics and industry situation. (orig.)

  17. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  18. On approximation of functions by product operators

    Directory of Open Access Journals (Sweden)

    Hare Krishna Nigam

    2013-12-01

    Full Text Available In the present paper, two quite new reults on the degree of approximation of a function f belonging to the class Lip(α,r, 1≤ r <∞ and the weighted class W(Lr,ξ(t, 1≤ r <∞ by (C,2(E,1 product operators have been obtained. The results obtained in the present paper generalize various known results on single operators.

  19. CRC-cards to support development and maintenance of product configuration systems

    DEFF Research Database (Denmark)

    Haug, Anders; Hvam, Lars

    2009-01-01

    This article presents a new definition of special Class, Responsibility and Collaboration (CRC) cards to be used for the development and maintenance of Product Configuration Systems (PCSs). CRC cards were introduced as an informal and user-friendly technique for teaching object-oriented modelling...... and maintenance of PCSs. This procedure has since been applied in several configuration projects and further developed at the Centre for Product Modelling (CPM) at the Technical University of Denmark. However, the investigations of two companies that applies CRC cards to document the knowledge base of their PCSs...

  20. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts