WorldWideScience

Sample records for processes laboratory building

  1. Guiding Principles for Sustainable Existing Buildings: Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-11-11

    In 2006, the United States (U.S.) Department of Energy (DOE) signed the Federal Leadership in High Performance and Sustainable Buildings Memorandum of Understanding (MOU), along with 21 other agencies. Pacific Northwest National Laboratory (PNNL) is exceeding this requirement and, currently, about 25 percent of its buildings are High Performance and Sustainable Buildings. The pages that follow document the Guiding Principles conformance effort for the Radiochemical Processing Laboratory (RPL) at PNNL. The RPL effort is part of continued progress toward a building inventory that is 100 percent compliant with the Guiding Principles.

  2. Laboratory Building

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Joshua M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    This report is an analysis of the means of egress and life safety requirements for the laboratory building. The building is located at Sandia National Laboratories (SNL) in Albuquerque, NM. The report includes a prescriptive-based analysis as well as a performance-based analysis. Following the analysis are appendices which contain maps of the laboratory building used throughout the analysis. The top of all the maps is assumed to be north.

  3. Building the Korogwe Laboratory

    DEFF Research Database (Denmark)

    Knudsen, Jakob; von Seidlein, Lorenz; Richard, Jean Pierre

    2011-01-01

    An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania.......An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania....

  4. Development of a building performance laboratory for South Africa

    CSIR Research Space (South Africa)

    Parsons, S

    2009-05-01

    Full Text Available The CSIR Building Science and Technology Competence area is currently in the process of establishing a Building Performance Laboratory (BPL). The BPL is aimed at becoming a centre at which the knowledge generation and technology development...

  5. Building for changing-rooms, laundry, laboratories

    International Nuclear Information System (INIS)

    Nemeth, L.; Mezes, J.; Gulyas, F.; Hejj, A.; Matyas, J.

    1979-01-01

    This building accomodates important service sections of the power plant. The changing-rooms of the primary circuit are here, through which the employees, under the supervision of health physics service, pass to the radioactive contaminated jobs. Working-clothes are cleaned in laundries located on the ground-floor. The building houses the health measurement control rooms of the four reactor sets and the control centre of the power plant. The laboratories dealing with process control, electrical engineering, radiology, dosimetry, material tests and reactor physics will be located here. (author)

  6. Green Building Research Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Sailor, David Jean [Portland State Univ., Portland, OR (United States)

    2013-12-29

    This project provided support to the Green Building Research Laboratory at Portland State University (PSU) so it could work with researchers and industry to solve technical problems for the benefit of the green building industry. It also helped to facilitate the development of PSU’s undergraduate and graduate-level training in building science across the curriculum.

  7. Advanced Manufacturing Processes Laboratory Building 878 hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Wood, C.; Thornton, W.; Swihart, A.; Gilman, T.

    1994-07-01

    The introduction of the hazards assessment process is to document the impact of the release of hazards at the Advanced Manufacturing Processes Laboratory (AMPL) that are significant enough to warrant consideration in Sandia National Laboratories` operational emergency management program. This hazards assessment is prepared in accordance with the Department of Energy Order 5500.3A requirement that facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment provides an analysis of the potential airborne release of chemicals associated with the operations and processes at the AMPL. This research and development laboratory develops advanced manufacturing technologies, practices, and unique equipment and provides the fabrication of prototype hardware to meet the needs of Sandia National Laboratories, Albuquerque, New Mexico (SNL/NM). The focus of the hazards assessment is the airborne release of materials because this requires the most rapid, coordinated emergency response on the part of the AMPL, SNL/NM, collocated facilities, and surrounding jurisdiction to protect workers, the public, and the environment.

  8. Advanced Manufacturing Processes Laboratory Building 878 hazards assessment document

    International Nuclear Information System (INIS)

    Wood, C.; Thornton, W.; Swihart, A.; Gilman, T.

    1994-07-01

    The introduction of the hazards assessment process is to document the impact of the release of hazards at the Advanced Manufacturing Processes Laboratory (AMPL) that are significant enough to warrant consideration in Sandia National Laboratories' operational emergency management program. This hazards assessment is prepared in accordance with the Department of Energy Order 5500.3A requirement that facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment provides an analysis of the potential airborne release of chemicals associated with the operations and processes at the AMPL. This research and development laboratory develops advanced manufacturing technologies, practices, and unique equipment and provides the fabrication of prototype hardware to meet the needs of Sandia National Laboratories, Albuquerque, New Mexico (SNL/NM). The focus of the hazards assessment is the airborne release of materials because this requires the most rapid, coordinated emergency response on the part of the AMPL, SNL/NM, collocated facilities, and surrounding jurisdiction to protect workers, the public, and the environment

  9. Self-benchmarking Guide for Laboratory Buildings: Metrics, Benchmarks, Actions

    Energy Technology Data Exchange (ETDEWEB)

    Mathew, Paul; Greenberg, Steve; Sartor, Dale

    2009-07-13

    This guide describes energy efficiency metrics and benchmarks that can be used to track the performance of and identify potential opportunities to reduce energy use in laboratory buildings. This guide is primarily intended for personnel who have responsibility for managing energy use in existing laboratory facilities - including facilities managers, energy managers, and their engineering consultants. Additionally, laboratory planners and designers may also use the metrics and benchmarks described in this guide for goal-setting in new construction or major renovation. This guide provides the following information: (1) A step-by-step outline of the benchmarking process. (2) A set of performance metrics for the whole building as well as individual systems. For each metric, the guide provides a definition, performance benchmarks, and potential actions that can be inferred from evaluating this metric. (3) A list and descriptions of the data required for computing the metrics. This guide is complemented by spreadsheet templates for data collection and for computing the benchmarking metrics. This guide builds on prior research supported by the national Laboratories for the 21st Century (Labs21) program, supported by the U.S. Department of Energy and the U.S. Environmental Protection Agency. Much of the benchmarking data are drawn from the Labs21 benchmarking database and technical guides. Additional benchmark data were obtained from engineering experts including laboratory designers and energy managers.

  10. Process waste assessment for the Radiography Laboratory

    International Nuclear Information System (INIS)

    Phillips, N.M.

    1994-07-01

    This Process Waste Assessment was conducted to evaluate the Radiography Laboratory, located in Building 923. It documents the processes, identifies the hazardous chemical waste streams generated by these processes, recommends possible ways to minimize waste, and serves as a reference for future assessments of this facility. The Radiography Laboratory provides film radiography or radioscopy (electronic imaging) of weapon and nonweapon components. The Radiography Laboratory has six x-ray machines and one gamma ray source. It also has several other sealed beta- and gamma-ray isotope sources of low microcurie (μCi) activity. The photochemical processes generate most of the Radiography Laboratory's routinely generated hazardous waste, and most of that is generated by the DuPont film processor. Because the DuPont film processor generates the most photochemical waste, it was selected for an estimated material balance

  11. SAFETY IN THE DESIGN OF SCIENCE LABORATORIES AND BUILDING CODES.

    Science.gov (United States)

    HOROWITZ, HAROLD

    THE DESIGN OF COLLEGE AND UNIVERSITY BUILDINGS USED FOR SCIENTIFIC RESEARCH AND EDUCATION IS DISCUSSED IN TERMS OF LABORATORY SAFETY AND BUILDING CODES AND REGULATIONS. MAJOR TOPIC AREAS ARE--(1) SAFETY RELATED DESIGN FEATURES OF SCIENCE LABORATORIES, (2) LABORATORY SAFETY AND BUILDING CODES, AND (3) EVIDENCE OF UNSAFE DESIGN. EXAMPLES EMPHASIZE…

  12. Building a Laboratory-Scale Biogas Plant and Verifying its Functionality

    Science.gov (United States)

    Boleman, Tomáš; Fiala, Jozef; Blinová, Lenka; Gerulová, Kristína

    2011-01-01

    The paper deals with the process of building a laboratory-scale biogas plant and verifying its functionality. The laboratory-scale prototype was constructed in the Department of Safety and Environmental Engineering at the Faculty of Materials Science and Technology in Trnava, of the Slovak University of Technology. The Department has already built a solar laboratory to promote and utilise solar energy, and designed SETUR hydro engine. The laboratory is the next step in the Department's activities in the field of renewable energy sources and biomass. The Department is also involved in the European Union project, where the goal is to upgrade all existed renewable energy sources used in the Department.

  13. A History of Building 828, Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Ullrich, Rebecca

    1999-08-01

    This report documents the history of Building 828 in Sandia National Laboratories' Technical Area I. Building 828 was constructed in 1946 as a mechanical test laboratory for Los Alamos' Z-Division (later Sandia) as it moved to Sandia Base. The building has undergone significant remodeling over the years and has had a variety of occupants. The building was evaluated in compliance with the National Historic Preservation Act, but was not eligible for the National Register of Historic Places. Nevertheless, for many Labs employees, it was a symbol of Sandia's roots in World War II and the Manhattan Project.

  14. Environmental Assessment for the vacuum process laboratory (VPL) relocation at the Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1992-04-01

    This Environmental Assessment (EA) evaluates the potential environmental impacts of relocating a vacuum process laboratory (VPL) from Building 321 to Building 2231 at Lawrence Livermore National Laboratory (LLNL). The VPL provides the latest technology in the field of vacuum deposition of coatings onto various substrates for several weapons-related and energy-related programs at LLNL. Operations within the VPL at LLNL will not be expanded nor reduced by the relocation. No significant environmental impacts are expected as a result of the relocation of the VPL

  15. Process Waste Assessment for the Plotting and Digitizing Support Laboratory

    International Nuclear Information System (INIS)

    Phillips, N.M.

    1994-04-01

    This Process Waste Assessment was conducted to evaluate the Plotting and Digitizing Support Laboratory, located in Building 913, Room 157. It documents the processes, identifies the hazardous chemical waste streams generated by these processes, recommends possible ways to minimize waste, and serves as a reference for future assessments of this facility

  16. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S ampersand M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed

  17. Fire preparedness measures in buildings with hot laboratories

    International Nuclear Information System (INIS)

    Oberlaender, B.C.

    2003-01-01

    Important hot laboratory safety issues are the general design/construction of the building with respect to fire, fire prevention, fire protection, administrative controls, and risk assessment. Within the network of the European Working Group Hot Laboratories and Remote Handling items concerning 'fire preparedness measures in hot laboratories' were screened and studied. Two questionnaires were sent to European hot laboratories; the first in November 2002 on 'fire preparedness measures, fire detection and fire suppression/extinguishing in lead shielded cells, concrete shielded cells' and the second in June 2003 on 'Fire preparedness measures in buildings with hot laboratories'. The questionnaires were filled in by a total of ten hot laboratories in seven European countries. On request of participants the answers were evaluated and 'anonymised' for presentation and discussion at the plenary meeting. The answers showed that many European hot laboratories are implementing improvements to their fire protection programmes to comply with more stringent requirements of the national authorities. The recommendations ('International guidelines for the fire protection of Nuclear Power Plants') given by the insurance pools are followed up with national variations. An ISO standard (ISO 17873) is in progress giving criteria for the design and the operation of ventilation systems as well as fire hazard management in nuclear installations others than reactors

  18. Tools for building virtual laboratories

    International Nuclear Information System (INIS)

    Agarwal, Debora; Johnston, William E.; Loken, Stewart; Tierney, Brian

    1996-01-01

    There is increasing interest in making unique research facilities facilities accessible on the Internet. Computer systems, scientific databases and experimental apparatus can be used by international collaborations of scientists using high-speed networks and advanced software tools to support collaboration. We are building tools including video conferencing and electronic white boards that are being used to create examples of virtual laboratories. This paper describes two pilot projects which provide testbeds for the tools. The first is a virtual laboratory project providing remote access to LBNL's Advanced Light Source. The second is the Multidimensional Applications and Gigabit internet work Consortium (MAGIC) testbed which has been established to develop a very high-speed, wide-are network to deliver realtime data at gigabit-per-second rates. (author)

  19. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    International Nuclear Information System (INIS)

    Shields, K.D.; Ballinger, M.Y.

    1999-03-01

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities

  20. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  1. Final Safety Analysis Document for Building 693 Chemical Waste Storage Building at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Salazar, R.J.; Lane, S.

    1992-02-01

    This Safety Analysis Document (SAD) for the Lawrence Livermore National Laboratory (LLNL) Building 693, Chemical Waste Storage Building (desipated as Building 693 Container Storage Unit in the Laboratory's RCRA Part B permit application), provides the necessary information and analyses to conclude that Building 693 can be operated at low risk without unduly endangering the safety of the building operating personnel or adversely affecting the public or the environment. This Building 693 SAD consists of eight sections and supporting appendices. Section 1 presents a summary of the facility designs and operations and Section 2 summarizes the safety analysis method and results. Section 3 describes the site, the facility desip, operations and management structure. Sections 4 and 5 present the safety analysis and operational safety requirements (OSRs). Section 6 reviews Hazardous Waste Management's (HWM) Quality Assurance (QA) program. Section 7 lists the references and background material used in the preparation of this report Section 8 lists acronyms, abbreviations and symbols. Appendices contain supporting analyses, definitions, and descriptions that are referenced in the body of this report

  2. Decommissioning of the MTR-605 process water building at the Idaho National Engineering Laboratory. Final report

    International Nuclear Information System (INIS)

    Browder, J.H.; Wills, E.L.

    1985-01-01

    Decontamination and decommissioning (D and D) of the unused radioactively contaminated portions of the MTR-605 building at the Test Reactor Area of the Idaho National Engineering Laboratory has been completed; this final report describes the D and D project. The building is a two-story concrete structure that was used to house piping systems to channel and control coolant water flow for the Materials Testing Reactor (MTR), a 40 MW (thermal) light water test reactor that was operated from 1952 until 1970 and then deactivated. D and D project objectives were to reduce potential environmental and radioactive contamination hazards to levels as low a reasonably achievable. Primary tasks of the D and D project were: to remove contaminated piping (about 400 linear ft of 36- and 30-in.-dia stainless steel pipe) and valves from the primary coolant pipe tunnels, to remove a primary coolant pump and piping, and to remove the three 8-ft-dia by 25-ft-long evaporators from the building second floor

  3. Process innovation laboratory

    DEFF Research Database (Denmark)

    Møller, Charles

    2007-01-01

    to create a new methodology for developing and exploring process models and applications. The paper outlines the process innovation laboratory as a new approach to BPI. The process innovation laboratory is a comprehensive framework and a collaborative workspace for experimenting with process models....... The process innovation laboratory facilitates innovation by using an integrated action learning approach to process modelling in a controlled environment. The study is based on design science and the paper also discusses the implications to EIS research and practice......Most organizations today are required not only to operate effective business processes but also to allow for changing business conditions at an increasing rate. Today nearly every business relies on their enterprise information systems (EIS) for process integration and future generations of EIS...

  4. Report of the laboratory building for late occurring injury

    International Nuclear Information System (INIS)

    1978-01-01

    In order to estimate the danger of low level radiation to human beings, the studies of the late-occurring injuries and internal exposure due to radionuclide deposition are necessary. In the National Institute of Radiological Sciences, research on the estimation of the danger of late-occurring injuries due to radiation is proceeding. In this connection, a late-occurring injury laboratory building has been completed recently. Basic ideas behind it are as follows. To carry out the above mentioned studies effectively and efficiently, many experimental animals of high quality must be kept under best possible environment. For the observation in a series of experiments, irradiation room and laboratory rooms are essential. The building comprises the following: the first floor for animal receiving, the second floor for laboratory rooms, the third floor for RI facility and X-ray irradiated animal keeping, the fourth floor for SPF animal keeping, and attic floor for water supply, etc. (J.P.N.)

  5. Seismic strengthening of building 111 at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Eli, M.; Coats, D.; Freeland, G.; Kamath, M.

    1991-01-01

    Since being designed and constructed in the late 1960s, the Director's Building (Building 111) at Lawrence Livermore National Laboratory (LLNL) has been evaluated for 1988 seismic criteria and has been upgraded to withstand a major earthquake in the Livermore area. During and immediately after a large earthquake in the Livermore area, Building 111 occupants would be able to exit safely without loss of life. Building 111 itself would be severely damaged, but would not collapse. Highlights of the seismic upgrade design criteria and of the design, analyses, and construction that resulted are presented in this paper

  6. Fuels Processing Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — NETL’s Fuels Processing Laboratory in Morgantown, WV, provides researchers with the equipment they need to thoroughly explore the catalytic issues associated with...

  7. Building an Agent-Based Laboratory Infrastructure for Higher Education

    Directory of Open Access Journals (Sweden)

    Muna Saqer

    2009-08-01

    Full Text Available We present an ongoing project at the University of Houston- Downtown (UHD that aims to build a grid as a laboratory environment to support undergraduate education. We intend to use this PC clusters centered grid to allow students to perform laboratory exercises through web interfaces. In order to accommodate lab packages of a growing number of courses, we design the system as a modular system using multi-agent modeling. Students are recruited to implement the units of the system as senior student project topics or research activities sponsored by the Scholar's Academy of UHD. Through these projects, we geared our research toward higher education and provided students with opportunities to participate in building a computational infrastructure for curriculum improvement. This is very important for a minority-serving institution (MSI with limited resources such as UHD.

  8. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  9. Decontamination and demolition of a former plutonium processing facility's process exhaust system, firescreen, and filter plenum buildings

    International Nuclear Information System (INIS)

    LaFrate, P.J. Jr.; Stout, D.S.; Elliott, J.W.

    1996-01-01

    The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, and decommissioned a process exhaust system, two filter plenum buildings, and a firescreen plenum structure at Technical Area 21 (TA-2 1). The project began in August 1995 and was completed in January 1996. These high-efficiency particulate air (HEPA) filter plenums and associated ventilation ductwork provided process exhaust to fume hoods and glove boxes in TA-21 Buildings 2 through 5 when these buildings were active plutonium and uranium processing and research facilities. This paper summarizes the history of TA-21 plutonium and uranium processing and research activities and provides a detailed discussion of integrated work process controls, characterize-as-you-go methodology, unique engineering controls, decontamination techniques, demolition methodology, waste minimization, and volume reduction. Also presented in detail are the challenges facing the LANL Decommissioning Project to safely and economically decontaminate and demolish surplus facilities and the unique solutions to tough problems. This paper also shows the effectiveness of the integrated work package concept to control work through all phases

  10. Decontamination and demolition of a former plutonium processing facility's process exhaust system, firescreen, and filter plenum buildings

    International Nuclear Information System (INIS)

    LaFrate, P.J. Jr.; Stout, D.S.; Elliott, J.W.

    1996-01-01

    The Los Alamos National Laboratory (LANL) Decommissioning Project has decontaminated, demolished, and decommissioned a process exhaust system, two filter plenum buildings, and a firescreen plenum structure at Technical Area 21 (TA-21). The project began in August 1995 and was completed in January 1996. These high-efficiency particulate air (HEPA) filter plenums and associated ventilation ductwork provided process exhaust to fume hoods and glove boxes in TA-21 Buildings 2 through 5 when these buildings were active plutonium and uranium processing and research facilities. This paper summarizes the history of TA-21 plutonium and uranium processing and research activities and provides a detailed discussion of integrated work process controls, characterize-as-you-go methodology, unique engineering controls, decontamination techniques, demolition methodology, waste minimization, and volume reduction. Also presented in detail are the challenges facing the LANL Decommissioning Project to safely and economically decontaminate and demolish surplus facilities and the unique solutions to tough problems. This paper also shows the effectiveness of the integrated work package concept to control work through all phases

  11. Final environmental assessment: TRU waste drum staging building, Technical Area 55, Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1996-01-01

    Much of the US Department of Energy's (DOE's) research on plutonium metallurgy and plutonium processing is performed at Los Alamos National Laboratory (LANL), in Los Alamos, New Mexico. LANL's main facility for plutonium research is the Plutonium Facility, also referred to as Technical Area 55 (TA-55). The main laboratory building for plutonium work within the Plutonium Facility (TA-55) is the Plutonium Facility Building 4, or PF-4. This Environmental Assessment (EA) analyzes the potential environmental effects that would be expected to occur if DOE were to stage sealed containers of transuranic (TRU) and TRU mixed waste in a support building at the Plutonium Facility (TA-55) that is adjacent to PF-4. At present, the waste containers are staged in the basement of PF-4. The proposed project is to convert an existing support structure (Building 185), a prefabricated metal building on a concrete foundation, and operate it as a temporary staging facility for sealed containers of solid TRU and TRU mixed waste. The TRU and TRU mixed wastes would be contained in sealed 55-gallon drums and standard waste boxes as they await approval to be transported to TA-54. The containers would then be transported to a longer term TRU waste storage area at TA-54. The TRU wastes are generated from plutonium operations carried out in PF-4. The drum staging building would also be used to store and prepare for use new, empty TRU waste containers

  12. Build of virtual instrument laboratory related to nuclear species specialized

    International Nuclear Information System (INIS)

    Shan Jian; Zhao Guizhi; Zhao Xiuliang; Tang Lingzhi

    2009-01-01

    As rapid development of specialized related to nuclear science,the requirement of laboratory construct is analyzed in this article at first, One total conceive, One scheme deploy soft and hardware,three concrete characteristics targets and five different phases of put in practice of virtual instrument laboratory of specialized related to nuclear science are suggest in the paper,the concrete hardware structure and the headway of build of virtual instrument laboratory are described,and the first step effect is introduced.Lastly,the forward target and the further deliberateness that the virtual instrument laboratory construct are set forth in the thesis. (authors)

  13. Radiochemical Processing Laboratory (RPL)

    Data.gov (United States)

    Federal Laboratory Consortium — The Radiochemical Processing Laboratory (RPL)�is a scientific facility funded by DOE to create and implement innovative processes for environmental clean-up and...

  14. Lightning attachment process to common buildings

    Science.gov (United States)

    Saba, M. M. F.; Paiva, A. R.; Schumann, C.; Ferro, M. A. S.; Naccarato, K. P.; Silva, J. C. O.; Siqueira, F. V. C.; Custódio, D. M.

    2017-05-01

    The physical mechanism of lightning attachment to grounded structures is one of the most important issues in lightning physics research, and it is the basis for the design of the lightning protection systems. Most of what is known about the attachment process comes from leader propagation models that are mostly based on laboratory observations of long electrical discharges or from observations of lightning attachment to tall structures. In this paper we use high-speed videos to analyze the attachment process of downward lightning flashes to an ordinary residential building. For the first time, we present characteristics of the attachment process to common structures that are present in almost every city (in this case, two buildings under 60 m in São Paulo City, Brazil). Parameters like striking distance and connecting leaders speed, largely used in lightning attachment models and in lightning protection standards, are revealed in this work.Plain Language SummarySince the time of Benjamin Franklin, no one has ever recorded high-speed video images of a lightning connection to a common building. It is very difficult to do it. Cameras need to be very close to the structure chosen to be observed, and long observation time is required to register one lightning strike to that particular structure. Models and theories used to determine the zone of protection of a lightning rod have been developed, but they all suffer from the lack of field data. The submitted manuscript provides results from high-speed video observations of lightning attachment to low buildings that are commonly found in almost every populated area around the world. The proximity of the camera and the high frame rate allowed us to see interesting details that will improve the understanding of the attachment process and, consequently, the models and theories used by lightning protection standards. This paper also presents spectacular images and videos of lightning flashes connecting lightning rods that

  15. Radon measurements during the building of a low-level laboratory

    CERN Document Server

    Antanasijevic, R; Bikit, I; Banjanac, R; Dragic, A; Joksimovic, D; Krmpotic, D; Udovicic, V; Vukovic, J

    1999-01-01

    Radon measurements were provided during the different stages of building of a low-level laboratory in Belgrade. The depth of the laboratory is 12 m, equivalent to 30 m of water with an area of 45 m sup 2. The whole of the laboratory is hermetically lined with 1 mm A1 foil and is ventilated with filtered air. Radon concentrations were measured with the CR-39 detector as well as via the gamma-ray spectroscopic measurements. The radon concentrations in the air were achieved to 20 Bqm sup - sup 3 and reduction of secondary and tertiary cosmic-ray fluxes is five times when ventilation, filtering and sealing was applied.

  16. Radon measurements during the building of a low-level laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Antanasijevic, R.; Anicin, I.; Bikit, I.; Banjanac, R.; Dragic, A.; Joksimovic, D.; Krmpotic, D.; Udovicic, V.; Vukovic, J

    1999-06-01

    Radon measurements were provided during the different stages of building of a low-level laboratory in Belgrade. The depth of the laboratory is 12 m, equivalent to 30 m of water with an area of 45 m{sup 2}. The whole of the laboratory is hermetically lined with 1 mm A1 foil and is ventilated with filtered air. Radon concentrations were measured with the CR-39 detector as well as via the gamma-ray spectroscopic measurements. The radon concentrations in the air were achieved to 20 Bqm{sup -3} and reduction of secondary and tertiary cosmic-ray fluxes is five times when ventilation, filtering and sealing was applied.

  17. Radon measurements during the building of a low-level laboratory

    International Nuclear Information System (INIS)

    Antanasijevic, R.; Anicin, I.; Bikit, I.; Banjanac, R.; Dragic, A.; Joksimovic, D.; Krmpotic, D.; Udovicic, V.; Vukovic, J.

    1999-01-01

    Radon measurements were provided during the different stages of building of a low-level laboratory in Belgrade. The depth of the laboratory is 12 m, equivalent to 30 m of water with an area of 45 m 2 . The whole of the laboratory is hermetically lined with 1 mm A1 foil and is ventilated with filtered air. Radon concentrations were measured with the CR-39 detector as well as via the gamma-ray spectroscopic measurements. The radon concentrations in the air were achieved to 20 Bqm -3 and reduction of secondary and tertiary cosmic-ray fluxes is five times when ventilation, filtering and sealing was applied

  18. Zion National Park Visitor Center: Significant Energy Savings Achieved through a Whole-Building Design Process: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Torcellini, P.; Judkoff, R.; Hayter, S.

    2002-07-01

    The National Park Service (NPS) applied a whole-building design process developed at the National Renewable Energy Laboratory (NREL) to create a building that performs more than 70% better than a comparable code-compliant building at no additional construction cost. This whole-building design process involves a committed design team, including the energy consultant, in the earliest conceptual design phase and continues through building commissioning. The design team for this project included the architect, engineer, energy consultant, landscape architect, owner, operator, and others who could influence the building design and operation. Extensive whole-building energy and lighting computer simulations were conducted throughout the process, which included the integration of energy efficient and renewable energy technologies into the building. The design team, inspired by natural cooling within the canyon, developed simple solutions to create an extremely energy efficient building. The se strategies included natural ventilation cooling, cooltowers for evaporative cooling without distribution fans, daylighting, massive building materials, Trombe walls and direct solar gains for heating, engineered window overhangs for solar load control, a building automation system to maintain comfort and control the energy-efficient lighting system, and a roof-mounted photovoltaic system to offset building electrical loads and ensure a power supply during the frequent utility grid outages.

  19. Building bridges between clinical and forensic toxicology laboratories.

    Science.gov (United States)

    Martin, Bernardino Barcelo; Gomila, Isabel; Noce, Valeria

    2018-05-09

    Clinical and forensic toxicology can be defined as the two disciplines involved the detection, identification and measurement of xenobiotics in biological and non-biological specimens to help in the diagnosis, treatment, prognosis, prevention of poisonings and to disclose causes and contributory causes of fatal intoxications, respectively. This article explores the close connections between clinical and forensic toxicology in overlapping areas of interest. An update has been carried out of the following seven areas of interest in analytical toxicology: doping control, sudden cardiac death (SCD), brain death, sudden infant death syndrome (SIDS) and Munchausen syndrome by proxy (MSBP), prenatal exposure to drugs and fetal alcohol syndrome (FAS), drug-facilitated crimes (DFC) and intoxications by new psychoactive substances (NPS). While issues such as SCD, SIDS or doping control are investigated mainly in forensic laboratories, other as prenatal exposure to drugs or FAS are mainly treated in clinical laboratories. On the other hand, areas such MSBP, DFC or the intoxications by NPS are of interest in both laboratories. Some of these topics are initially treated in hospital emergency departments, involving clinical laboratories and sometimes lately derived to forensic laboratories. Conversely, cases with initial medical-legal implications and fatalities are directly handled by forensic toxicology, but may trigger further studies in the clinical setting. Many areas of common interest between clinical and forensic laboratories are building bridges between them. The increasing relationships are improving the growth, the reliability and the robustness of both kind of laboratories. Copyright© Bentham Science Publishers; For any queries, please email at epub@benthamscience.org.

  20. Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building

    Directory of Open Access Journals (Sweden)

    Geauchul LEE

    2016-04-01

    Full Text Available This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern ‘model’ like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.

  1. [Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].

    Science.gov (United States)

    Lee, Geauchul

    2016-04-01

    This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.

  2. BubbleZERO—Design, Construction and Operation of a Transportable Research Laboratory for Low Exergy Building System Evaluation in the Tropics

    Directory of Open Access Journals (Sweden)

    Arno Schlueter

    2013-09-01

    Full Text Available We present the design, construction and operation of a novel building systems laboratory, the BubbleZERO—Zero Emission Research Operation. Our objective was to design a space to evaluate the performance of Swiss-developed low exergy building systems in the tropical climate of Singapore using an integrated design approach. The method we employed for evaluation in the tropics was to design and build a test bed out of the shipping containers that transported the prototype low exergy systems from Switzerland to Singapore. This approach resulted in a novel laboratory environment containing radiant cooling panels and decentralized air supply, along with a self-shading, inflated “bubble” skin, experimental low emissivity (LowE glazing, LED lighting, wireless sensors and distributed control. The laboratory evaluates and demonstrates for the first time in Singapore an integrated high-temperature cooling system with separate demand-controlled ventilation adapted for the tropics. It is a functional lab testing system in real tropical conditions. As such, the results showing the ability to mitigate the risk of condensation by maintaining a dew point below 18 °C by the separate decentralized ventilation are significant and necessary for potential future implementation in buildings. In addition, the control system provides new proof of concept for distributed wireless sensors and control for reliable automation of the systems. These key results are presented along with the integrated design process and real-life tropical operation of the laboratory.

  3. Biosafety and Biosecurity: A Relative Risk-Based Framework for Safer, More Secure, and Sustainable Laboratory Capacity Building.

    Science.gov (United States)

    Dickmann, Petra; Sheeley, Heather; Lightfoot, Nigel

    2015-01-01

    Laboratory capacity building is characterized by a paradox between endemicity and resources: countries with high endemicity of pathogenic agents often have low and intermittent resources (water, electricity) and capacities (laboratories, trained staff, adequate regulations). Meanwhile, countries with low endemicity of pathogenic agents often have high-containment facilities with costly infrastructure and maintenance governed by regulations. The common practice of exporting high biocontainment facilities and standards is not sustainable and concerns about biosafety and biosecurity require careful consideration. A group at Chatham House developed a draft conceptual framework for safer, more secure, and sustainable laboratory capacity building. The draft generic framework is guided by the phrase "LOCAL - PEOPLE - MAKE SENSE" that represents three major principles: capacity building according to local needs (local) with an emphasis on relationship and trust building (people) and continuous outcome and impact measurement (make sense). This draft generic framework can serve as a blueprint for international policy decision-making on improving biosafety and biosecurity in laboratory capacity building, but requires more testing and detailing development.

  4. Biosafety and Biosecurity: A relative risk-based framework for safer, more secure and sustainable laboratory capacity building

    Directory of Open Access Journals (Sweden)

    Petra eDickmann

    2015-10-01

    Full Text Available Background: Laboratory capacity building is characterized by a paradox between endemicity and resources: Countries with high endemicity of pathogenic agents often have low and intermittent resources (water, electricity and capacities (laboratories, trained staff, adequate regulations. Meanwhile, countries with low endemicity of pathogenic agents often have high containment facilities with costly infrastructure and maintenance governed by regulations. The common practice of exporting high biocontainment facilities and standards is not sustainable and concerns about biosafety and biosecurity require careful consideration. Methods: A group at Chatham House developed a draft conceptual framework for safer, more secure and sustainable laboratory capacity building. Results: The draft generic framework is guided by the phrase ‘LOCAL – PEOPLE – MAKE SENSE’ that represents three major principles: capacity building according to local needs (local with an emphasis on relationship and trust-building (people and continuous outcome and impact measurement (make sense. Conclusions: This draft generic framework can serve as a blueprint for international policy decision-making on improving biosafety and biosecurity in laboratory capacity building, but requires more testing and detailing development.

  5. A Laboratory Practical on the House Building Behaviour of Caddis Larvae

    Science.gov (United States)

    Hansell, M. H.

    1973-01-01

    Describes a laboratory practical on animal behavior suitable for senior secondary school or university biology classes. Several separate exercises relating to the house building behavior of caddis fly larvae are detailed, together with the time required for preparation. (JR)

  6. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    Science.gov (United States)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to

  7. User Driven Innovation in the Building Process

    DEFF Research Database (Denmark)

    Christiansson, Per; Sørensen, Kristian Birch; Rødtness, Mette

    2008-01-01

    During the late years there has been an ever-increasing focus on the possibilities to change the building process to raise quality on the final building products as well as the activities of actors involved in the building process. One reason for this interest is the new opportunities evolving du...... building design. A general methodological framework and meta ontology for Virtual Innovation in Construction is presented as well as findings from implementation of the method....... to introduction of advanced information and communication technology (ICT). The paper focuses on creative changes of the building process powered by user driven innovation activities. An overview of existing user driven innovation methodologies is given as well experiences from the ongoing Virtual Innovation...

  8. Avionics Systems Laboratory/Building 16. Historical Documentation

    Science.gov (United States)

    Slovinac, Patricia; Deming, Joan

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities that was conducted by NASA s Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Avionics Systems Laboratory (Building 16) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 16 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 16 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 16 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are

  9. Waste processing building with incineration technology

    Science.gov (United States)

    Wasilah, Wasilah; Zaldi Suradin, Muh.

    2017-12-01

    In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.

  10. Building Connecticut's clinical biodosimetry laboratory surge capacity to mitigate the health consequences of radiological and nuclear disasters: A collaborative approach between the state biodosimetry laboratory and Connecticut's medical infrastructure

    International Nuclear Information System (INIS)

    Albanese, Joseph; Martens, Kelly; Arnold, Jeffrey L.; Kelley, Katherine; Kristie, Virginia; Forte, Elaine; Schneider, Mark; Dainiak, Nicholas

    2007-01-01

    further optimize biodosimetry specimen processing protocols in Connecticut. Based on our findings, we conclude that clinical laboratory professionals are an important resource for assisting with the processing biodosimetry specimens that are used for triage of patients from accidental or terrorist-related mass-casualty radiological or nuclear catastrophies. The approach described in this paper to enroll and train clinical laboratorians in sample preparation for dicentric analysis forms the basis for the next step (namely, further training on harvesting cultured cells and preparing cytogenetic slides) in collaborative efforts between the State of Connecticut's Biodosimetry Laboratory and the state's medical infrastructure towards building laboratory surge capacity to estimate radiation dose in victims of a mass casualty event

  11. Brand building process of banking services

    Directory of Open Access Journals (Sweden)

    Filipović V.

    2006-01-01

    Full Text Available Changes related to competitive surroundings, legislation, and use of technology in banking business created new challenges for the managers in banking sector and emphasized the importance of brand building in the field of financial services. The need for financial institutions to manage its users in a way that provides them satisfaction, two-way communication and trust developing into loyalty was created. Regarding the research methodology, it is important to emphasize that the main discussion related to the purpose of research is to determine, improve, and better comprehend the main problems appearing in the process of brand building of banking services on the Belgrade market from the users standpoint. In order to realize the established purpose of the research, answers to the following research questions shall be provided: 1 Which problems in communication with the users are important for bank brand building?, 2 In what way do users see the image and personality of a bank? 3 In which way does brand of the origin of a bank influence the choice of users for the banking services? And 4 In which way the strategy of communication in the process of brand building of banking services can be improved? The quantitative approach to the research has been used. This study is based on the research procedure of surveys and data collection through a questionnaire, as an instrument in the research which was given to the adult citizens on the territory of the city of Belgrade. Statistic treatment of the data was conducted by using the SPSS software. The results are presented by using the combined techniques: in written form, in tables and graphs. So, the basic conclusions would be such as: after the marketing research on how banks carry on the processes of brand building was conducted, certain conclusions could be drawn from it: It is very important for a client to be involved in the process of brand building. By taking into consideration the criteria based on

  12. Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    2003-01-01

    NNSA, an agency within DOE, proposes to replace the Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL). The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s). The existing CMR Building, constructed in the early 1950s, houses most of LANL's analytical chemistry and materials characterization AC and MC capabilities. Other capabilities at the CMR Building include actinide processing, waste characterization, and nondestructive analysis that support a variety of NNSA and DOE nuclear materials management programs. In 1992, DOE initiated planning and implementation of CMR Building upgrades to address specific safety, reliability, consolidation, and security and safeguards issues. Later, in 1997 and 1998, a series of operational, safety, and seismic issues surfaced regarding the long-term viability of the CMR Building. Because of these issues, DOE determined that the extensive upgrades originally planned would be much more expensive and time consuming and of only marginal effectiveness. As a result, DOE decided to perform only the upgrades necessary to ensure the safe and reliable operation of the CMR Building through 2010 and to seek an alternative path for long-term reliability. The CMRR EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with the Proposed Action. The Proposed Action is to replace the CMR Building. The Preferred Alternative is to construct a new CMRR Facility at Technical Area (TA) 55, consisting of two or three buildings. One of the new buildings would provide space for administrative offices and support functions. The other building(s) would provide secure laboratory spaces for research and analytical support activities. The buildings would be expected to operate for a minimum of 50 years. Tunnels could be

  13. Energy Performance Indicators in the Swedish Building Procurement Process

    Directory of Open Access Journals (Sweden)

    Ingrid Allard

    2017-10-01

    Full Text Available In Sweden, all new buildings need to comply with the National Board of Housing, Building and Planning’s requirement on specific purchased energy (kWh/m2. Accordingly, this indicator is often used to set design criteria in the building procurement process. However, when energy use is measured in finished buildings, the measurements often deviate significantly from the design calculations. The measured specific purchased energy does not necessarily reflect the responsibility of the building contractor, as it is influenced by the building operation, user behavior and climate. Therefore, Swedish building practitioners may prefer other indicators for setting design criteria in the building procurement process. The aim of this study was twofold: (i to understand the Swedish building practitioners’ perspectives and opinions on seven building energy performance indicators (envelope air leakage, U-values for different building parts, average U-value, specific heat loss, heat loss coefficient, specific net energy, and specific purchased energy; and (ii to understand the consequences for the energy performance of multi-family buildings of using the studied indicators to set criteria in the procurement process. The study involved a Delphi approach and simulations of a multi-family case study building. The studied indicators were discussed in terms of how they may meet the needs of the building practitioners when used to set building energy performance criteria in the procurement process.

  14. A Componentizable Server-Side Framework for Building Remote and Virtual Laboratories

    Directory of Open Access Journals (Sweden)

    Jesús Luis Muros-Cobos

    2012-12-01

    Full Text Available Abstract—Currently, virtual/remotes laboratories are often being built to improve learning and researching capabilities in some areas of knowledge. Generally these virtual/remotes laboratories are built from scratch again and again, instead of reusing software and hardware infrastructures. This paper presents a new framework, RVLab, to help developers building flexible and robust server-side virtual and remotes laboratories quickly. RVLab affords support for the basic requirements of these systems such as the user management or the resources (instruments and devices reservation. Unlike other lab systems, RVLab is adapted to devices and instruments of any real laboratory due to a secure and robust mechanism that allows the remote execution of lab programs. Moreover, it improves the user interaction with real labs, providing a real-time visualization of experiments and lab instruments by means of the control of video camera placed into lab, and the transmission of video streaming with different quality to users.

  15. Laboratory capacity building for the International Health Regulations (IHR[2005]) in resource-poor countries: the experience of the African Field Epidemiology Network (AFENET).

    Science.gov (United States)

    Masanza, Monica Musenero; Nqobile, Ndlovu; Mukanga, David; Gitta, Sheba Nakacubo

    2010-12-03

    Laboratory is one of the core capacities that countries must develop for the implementation of the International Health Regulations (IHR[2005]) since laboratory services play a major role in all the key processes of detection, assessment, response, notification, and monitoring of events. While developed countries easily adapt their well-organized routine laboratory services, resource-limited countries need considerable capacity building as many gaps still exist. In this paper, we discuss some of the efforts made by the African Field Epidemiology Network (AFENET) in supporting laboratory capacity development in the Africa region. The efforts range from promoting graduate level training programs to building advanced technical, managerial and leadership skills to in-service short course training for peripheral laboratory staff. A number of specific projects focus on external quality assurance, basic laboratory information systems, strengthening laboratory management towards accreditation, equipment calibration, harmonization of training materials, networking and provision of pre-packaged laboratory kits to support outbreak investigation. Available evidence indicates a positive effect of these efforts on laboratory capacity in the region. However, many opportunities exist, especially to support the roll-out of these projects as well as attending to some additional critical areas such as biosafety and biosecuity. We conclude that AFENET's approach of strengthening national and sub-national systems provide a model that could be adopted in resource-limited settings such as sub-Saharan Africa.

  16. Intertext: On Connecting Text in the Building Process

    DEFF Research Database (Denmark)

    Christensen, Lars Rune

    2015-01-01

    Actors in the building process are critically dependent on a corpus of written text that draws the distributed work tasks together. This paper introduces, on the basis of a field study, the concepts of corpus, intertext and intertextuality to the analysis of text in cooperative work practice. Thi...... type and the mediated type, may constitute the intertext of a particular task. By employing the concepts of corpus, intertext and intertextuality with respect to the study of the building process, this paper outlines an approach to the investigation of text in cooperative work.......Actors in the building process are critically dependent on a corpus of written text that draws the distributed work tasks together. This paper introduces, on the basis of a field study, the concepts of corpus, intertext and intertextuality to the analysis of text in cooperative work practice....... This paper shows that actors in the building process create intertext (connections) between complementary texts, in a particular situation and for a particular task. This has an integrating effect on the building process. Several types of intertextuality, including the complementary type, the intratextual...

  17. Area balance method for calculation of air interchange in fire-resesistance testing laboratory for building products and constructions

    Directory of Open Access Journals (Sweden)

    Sargsyan Samvel Volodyaevich

    2014-09-01

    Full Text Available Fire-resistance testing laboratory for building products and constructions is a production room with a substantial excess heat (over 23 W/m . Significant sources of heat inside the aforementioned laboratory are firing furnace, designed to simulate high temperature effects on structures and products of various types in case of fire development. The excess heat production in the laboratory during the tests is due to firing furnaces. The laboratory room is considered as an object consisting of two control volumes (CV, in each of which there may be air intake and air removal, pollutant absorption or emission. In modeling air exchange conditions the following processes are being considered: the processes connected with air movement in the laboratory room: the jet stream in a confined space, distribution of air parameters, air motion and impurity diffusion in the ventilated room. General upward ventilation seems to be the most rational due to impossibility of using local exhaust ventilation. It is connected with the peculiarities of technological processes in the laboratory. Air jets spouted through large-perforated surface mounted at the height of 2 m from the floor level, "flood" the lower control volume, entrained by natural convective currents from heat sources upward and removed from the upper area. In order to take advantage of the proposed method of the required air exchange calculation, you must enter additional conditions, taking into account the provision of sanitary-hygienic characteristics of the current at the entrance of the service (work area. Exhaust air containing pollutants (combustion products, is expelled into the atmosphere by vertical jet discharge. Dividing ventilated rooms into two control volumes allows describing the research process in a ventilated room more accurately and finding the air exchange in the lab room during the tests on a more reasonable basis, allowing to provide safe working conditions for the staff without

  18. Design of the Laboratory-Scale Plutonium Oxide Processing Unit in the Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Lumetta, Gregg J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Meier, David E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tingey, Joel M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Delegard, Calvin H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Edwards, Matthew K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Orton, Robert D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rapko, Brian M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Smart, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-05-01

    This report describes a design for a laboratory-scale capability to produce plutonium oxide (PuO2) for use in identifying and validating nuclear forensics signatures associated with plutonium production, as well as for use as exercise and reference materials. This capability will be located in the Radiochemical Processing Laboratory at the Pacific Northwest National Laboratory. The key unit operations are described, including PuO2 dissolution, purification of the Pu by ion exchange, precipitation, and re-conversion to PuO2 by calcination.

  19. The Laboratory for Advanced Materials Processing

    Data.gov (United States)

    Federal Laboratory Consortium — The Laboratory for Advanced Materials Processing - LAMP - is a clean-room research facility run and operated by Pr. Gary Rubloff's group. Research activities focus...

  20. Advanced fire prevention techniques for ITER-INDIA laboratory building, IPR

    International Nuclear Information System (INIS)

    Modi, D.V.; Channa Reddy, D.

    2016-01-01

    Just as air and water, survival of human life without fire is unimaginable. However, fire can be a boon as well as a bane. The ability to control the use of fire is an art towards improved industrial development. The same phenomenon is also applicable for research and development sector. Fire Safety is a key issue for any kind of research laboratories. Fire hazards in laboratories arise from the storage and use of flammable materials and electrical installations and from hazardous operations carried out there. The risk of damage due to fire depends on the combustible available, their physical arrangement, the geometry of the building, likelihood of the ignition, etc. The risk is also controlled by the fire protection measures in place, which relate to both fire prevention and fire control. (author)

  1. Acoustics. Measurement of sound insulation in buildings and of building elements. Laboratory measurements of the reduction of transmitted impact noise by floor coverings on a heavyweight standard floor

    CERN Document Server

    British Standards Institution. London

    1998-01-01

    Acoustics. Measurement of sound insulation in buildings and of building elements. Laboratory measurements of the reduction of transmitted impact noise by floor coverings on a heavyweight standard floor

  2. 27 CFR 555.222 - Table of distances between fireworks process buildings and between fireworks process and...

    Science.gov (United States)

    2010-04-01

    ... fireworks process buildings and between fireworks process and fireworks nonprocess buildings. 555.222... between fireworks process buildings and between fireworks process and fireworks nonprocess buildings. Net weight of fireworks 1 (pounds) Display fireworks 2 (feet) Consumer fireworks 3 (feet) 0-100 57 37 101-200...

  3. Toward a virtual building laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Klems, J.H.; Finlayson, E.U.; Olsen, T.H.; Banks, D.W.; Pallis, J.M.

    1999-03-01

    In order to achieve in a timely manner the large energy and dollar savings technically possible through improvements in building energy efficiency, it will be necessary to solve the problem of design failure risk. The most economical method of doing this would be to learn to calculate building performance with sufficient detail, accuracy and reliability to avoid design failure. Existing building simulation models (BSM) are a large step in this direction, but are still not capable of this level of modeling. Developments in computational fluid dynamics (CFD) techniques now allow one to construct a road map from present BSM's to a complete building physical model. The most useful first step is a building interior model (BIM) that would allow prediction of local conditions affecting occupant health and comfort. To provide reliable prediction a BIM must incorporate the correct physical boundary conditions on a building interior. Doing so raises a number of specific technical problems and research questions. The solution of these within a context useful for building research and design is not likely to result from other research on CFD, which is directed toward the solution of different types of problems. A six-step plan for incorporating the correct boundary conditions within the context of the model problem of a large atrium has been outlined. A promising strategy for constructing a BIM is the overset grid technique for representing a building space in a CFD calculation. This technique promises to adapt well to building design and allows a step-by-step approach. A state-of-the-art CFD computer code using this technique has been adapted to the problem and can form the departure point for this research.

  4. Sandia National Laboratories, Tonopah Test Range Assembly Building 9B (Building 09-54): Photographs and Written Historical and Descriptive Data

    Energy Technology Data Exchange (ETDEWEB)

    Ullrich, Rebecca A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Corporate Archives and History Program

    2017-08-01

    Assembly Building 9B (Building 09-54) is a contributing element to the Sandia National Laboratories (SNL) Tonopah Test Range (TTR) Historic District. The SNL TTR Historic District played a significant role in U.S. Cold War history in the areas of stockpile surveillance and non-nuclear field testing of nuclear weapons designs. The district covers approximately 179,200 acres and illustrates Cold War development testing of nuclear weapons components and systems. This report includes historical information, architectural information, sources of information, project information, maps, blueprints, and photographs.

  5. Release of ultrafine particles from three simulated building processes

    International Nuclear Information System (INIS)

    Kumar, Prashant; Mulheron, Mike; Som, Claudia

    2012-01-01

    Building activities are recognised to produce coarse particulate matter but less is known about the release of airborne ultrafine particles (UFPs; those below 100 nm in diameter). For the first time, this study has investigated the release of particles in the 5–560 nm range from three simulated building activities: the crushing of concrete cubes, the demolition of old concrete slabs, and the recycling of concrete debris. A fast response differential mobility spectrometer (Cambustion DMS50) was used to measure particle number concentrations (PNC) and size distributions (PNDs) at a sampling frequency of 10 Hz in a confined laboratory room providing controlled environment and near–steady background PNCs. The sampling point was intentionally kept close to the test samples so that the release of new UFPs during these simulated processes can be quantified. Tri–modal particle size distributions were recorded for all cases, demonstrating different peak diameters in fresh nuclei ( 4 cm −3 . These background modal peaks shifted towards the larger sizes during the work periods (i.e. actual experiments) and the total PNCs increased between 2 and 17 times over the background PNCs for different activities. After adjusting for background concentrations, the net release of PNCs during cube crushing, slab demolition, and ‘dry’ and ‘wet’ recycling events were measured as ∼0.77, 19.1, 22.7 and 1.76 (×10 4 ) cm −3 , respectively. The PNDs were converted into particle mass concentrations (PMCs). While majority of new PNC release was below 100 nm (i.e. UFPs), the bulk of new PMC emissions were constituted by the particles over 100 nm; ∼95, 79, 73 and 90% of total PNCs, and ∼71, 92, 93 and 91% of total PMCs, for cube crushing, slab demolition, dry recycling and wet recycling, respectively. The results of this study firmly elucidate the release of UFPs and raise a need for further detailed studies and designing health and safety related exposure guidelines for

  6. Upgrades and Enclosure of Building 15 at Technical Area 40: Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Plimpton, Kathryn D [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Garcia, Kari L. M [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brunette, Jeremy Christopher [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); McGehee, Ellen D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-15

    The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to upgrade and enclose Building 15 at Technical Area (TA) 40, Los Alamos National Laboratory. Building TA-40-15, a Cold War-era firing site, was determined eligible for listing in the National Register of Historic Places (Register) in DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69 (McGehee et al. 2005). Building TA-40-15 was constructed in 1950 to support detonator testing. The firing site will be enclosed by a steel building to create a new indoor facility that will allow for year-round mission capability. Enclosing TA-40-15 will adversely affect the building by altering the characteristics that make it eligible for the Register. In compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, the Field Office is initiating consultation for this proposed undertaking. The Field Office is also requesting concurrence with the use of standard practices to resolve adverse effects as defined in the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico.

  7. Design Process for Integrated Concepts with Responsive Building Elements

    DEFF Research Database (Denmark)

    Aa, Van der A.; Heiselberg, Per

    2008-01-01

    An integrated building concept is a prerequisite to come to an energy efficient building with a good and healthy IAQ indoor comfort. A design process that defines the targets and boundary conditions in the very first stage of the design and guarantees them until the building is finished and used...... is needed. The hard question is however: how to make the right choice of the combination of individual measures from building components and building services elements. Within the framework of IEA-ECBCS Annex 44 research has been conducted about the design process for integrated building concepts...

  8. Characterization of Under-Building Contamination at Rocky Flats Implementing Environmental-Measurement While Drilling Process with Horizontal Directional Drilling

    International Nuclear Information System (INIS)

    WILLIAMS, CECELIA V.; LOCKWOOD, GRANT J.; NORMANN, RANDY A.; LINDSAY, THOMAS

    2001-01-01

    Characterization is required on thirty-one buildings at Rocky Flats Environmental Technology Site (RFETS or the Site) with known or suspected under building contamination. The Site has teamed with Sandia National Laboratory (SNL) to deploy Environmental Measure-While-Drilling (EMWD) in conjunction with horizontal directional drilling (HDD) to characterize under building contamination and to evaluate the performance and applicability for future characterization efforts. The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental drill bit data during drilling operations. The project investigated two locations, Building 886 and Building 123. Building 886 is currently undergoing D and D activities. Building 123 was demolished in 1998; however, the slab is present with under building process waste lines and utilities. This report presents the results of the EMWD Gamma Ray Spectrometer logging of boreholes at these two sites. No gamma emitting contamination was detected at either location.(author)

  9. Structural Analysis and Seismic Design for Cold Neutron Laboratory Building

    International Nuclear Information System (INIS)

    Wu, Sangik; Kim, Y. K.; Kim, H. R.

    2007-05-01

    This report describes all the major results of the dynamic structural analysis and seismic design for the Cold Neutron Laboratory Building which is classified in seismic class II. The results are summarized of the ground response spectrum as seismic input loads, mechanical properties of subsoil, the buoyancy stability due to ground water, the maximum displacement of the main frame under the seismic load and the member design. This report will be used as a basic design report to maintenance its structural integrity in future

  10. Enhancement of the basic seismic assessment of the Los Alamos National Laboratory facilities and buildings

    International Nuclear Information System (INIS)

    Fritz-de la Orta, G.O.

    1995-01-01

    This paper presents the results of a comparison of values obtained for the seismic security of 479 buildings and facilities at Los Alamos National Laboratory following the methodology adapted from Dr. Otto Frit's original System, and the requirements contained both in FEMA-154 ''Rapid Visual Screening of Buildings for Potential Hazards: A Handbook'' and FEMA-187 ''NEHRP Handbook for the Seismic Evaluation of Existing Buildings.'' These comparisons were made from five buildings chosen randomly illustrating a wide variety of construction types and building configurations. Each building is divided into sectors, defined as portions of it that are attached additions to the original building, or portions separated by an expansion joint between the structural systems. The five buildings studied contain a total of sixteen sectors. The paper is divided into the following sections: Introduction; Basic Concepts of the LANL Methodology; Basic Concepts of FEMA-178; Highlights of the Comparison; Comments on the Results; and Final Words

  11. A Laboratory for studying radon mitigation methods in high-rise office buildings in Hong Kong

    International Nuclear Information System (INIS)

    Leung, J.K.C.; Hung, L.C.; Tso, M.Y.W.

    1996-01-01

    A territory-wide survey of indoor radon level in 1993 showed that 17% of offices Hong Kong have radon concentrations above 200 Bq m -3 compared with 4% for dwellings. Consequently, the Radioisotope Unit Radon Analysis Laboratory (RURAL) is being built for studying radon mitigation methods applicable to high-rise office buildings. The laboratory consists of three rooms; the main exposure room is built of concrete and is surrounded by the buffer room; and all controls and operations are done inside the control room. The exposure room can, with the aid of the buffer room, simulate any environmental conditions that can be faced by a real building. The pressure, temperature and humidity can be adjusted to any meteorological conditions that can be found in Hong Kong. Pressure differential and temperature differential can be adjusted to simulate the arrival of fronts, troughs or typhoons. Aerosol concentration and distribution inside the exposure room are controllable as well as the ventilation conditions. Various mitigation methods will be tested under different conditions. Passive methods include application of radon barriers to building structures and active methods include the use of air cleaners; techniques to increase radon daughters plateout or reduce their attachment to aerosols; and various modifications to the ventilation systems. Mitigation techniques involving modifications to the building strictures and building services will also be developed with the help of the RURAL. (author)

  12. Experimental Bleaching of a Reef-Building Coral Using a Simplified Recirculating Laboratory Exposure System

    Science.gov (United States)

    Determining stressor-response relationships in reef building corals is a critical need for researchers because of global declines in coral reef ecosystems. A simplified recirculating coral exposure system for laboratory testing of a diversity of species and morphologies of reef b...

  13. Management of purchase process in realization of building investment

    Directory of Open Access Journals (Sweden)

    M. Radoń

    2010-07-01

    Full Text Available In building companies process of product and service purchase is one of the main processes of quality management system [1]. Because ofshort time-limits of contract realization, high specialization of works, necessity of fulfillment of high quality requirements and assurance of profitable financial effects the management of purchase process becomes very important element of work of the building company. The serious problem in creating and keeping the efficient system of purchase management is special type of purchase in building companies. Particular investments are realized in different country regions, objects are built based on the individual design documentations and each building becomes independent organization unit that organize purchase necessary for investment realization.An example of the management system of purchase process in building company is described in the paper. Just In Time system is widelyused during the realization of building investment. This system is especially useful in buildings because some investments, especially inbig cities, are characterized by restriction in building site. This makes impossible storing the products. In such cases close synchronization between times of delivery and requirements of purchase schedule and schedule of building realization is very important. Criteria of supplier selection as well as the methods of choosing the supplier are also presented in the paper. Special attention is paid to necessity of valuation of the purchase efficiency and the purchase risk. Basic coefficients of purchase efficiency are also described in the paper.

  14. Corrective Action Decision Document, Area 15 Environmental Protection Agency Farm Laboratory Building, Corrective Action Unit No. 95, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-18

    This report is the Corrective Action Decision Document (CADD) for the Nevada Test Site (NTS) Area 15 U.S. Environmental Protection Agency (EPA) Farm, Laboratory Building (Corrective Action Unit [CAU] No. 95), at the Nevada Test Site, Nye County, Nevada. The scope of this CADD is to identify and evaluate potential corrective action alternatives for the decommissioning and decontamination (D and D) of the Laboratory Building, which were selected based on the results of investigative activities. Based on this evaluation, a preferred corrective action alternative is recommended. Studies were conducted at the EPA Farm from 1963 to 1981 to determine the animal intake and retention of radionuclides. The main building, the Laboratory Building, has approximately 370 square meters (4,000 square feet) of operational space. Other CAUS at the EPA Farm facility that will be investigated and/or remediated through other environmental restoration subprojects are not included in this CADD, with the exception of housekeeping sites. Associated structures that do not require classification as CAUS are considered in the evaluation of corrective action alternatives for CAU 95.

  15. Corrective Action Decision Document, Area 15 Environmental Protection Agency Farm Laboratory Building, Corrective Action Unit No. 95, Revision 0

    International Nuclear Information System (INIS)

    1997-01-01

    This report is the Corrective Action Decision Document (CADD) for the Nevada Test Site (NTS) Area 15 U.S. Environmental Protection Agency (EPA) Farm, Laboratory Building (Corrective Action Unit [CAU] No. 95), at the Nevada Test Site, Nye County, Nevada. The scope of this CADD is to identify and evaluate potential corrective action alternatives for the decommissioning and decontamination (D and D) of the Laboratory Building, which were selected based on the results of investigative activities. Based on this evaluation, a preferred corrective action alternative is recommended. Studies were conducted at the EPA Farm from 1963 to 1981 to determine the animal intake and retention of radionuclides. The main building, the Laboratory Building, has approximately 370 square meters (4,000 square feet) of operational space. Other CAUS at the EPA Farm facility that will be investigated and/or remediated through other environmental restoration subprojects are not included in this CADD, with the exception of housekeeping sites. Associated structures that do not require classification as CAUS are considered in the evaluation of corrective action alternatives for CAU 95

  16. Toward a General Research Process for Using Dubin's Theory Building Model

    Science.gov (United States)

    Holton, Elwood F.; Lowe, Janis S.

    2007-01-01

    Dubin developed a widely used methodology for theory building, which describes the components of the theory building process. Unfortunately, he does not define a research process for implementing his theory building model. This article proposes a seven-step general research process for implementing Dubin's theory building model. An example of a…

  17. Data Preparation Process for the Buildings Performance Database

    Energy Technology Data Exchange (ETDEWEB)

    Walter, Travis; Dunn, Laurel; Mercado, Andrea; Brown, Richard E.; Mathew, Paul

    2014-06-30

    The Buildings Performance Database (BPD) includes empirically measured data from a variety of data sources with varying degrees of data quality and data availability. The purpose of the data preparation process is to maintain data quality within the database and to ensure that all database entries have sufficient data for meaningful analysis and for the database API. Data preparation is a systematic process of mapping data into the Building Energy Data Exchange Specification (BEDES), cleansing data using a set of criteria and rules of thumb, and deriving values such as energy totals and dominant asset types. The data preparation process takes the most amount of effort and time therefore most of the cleansing process has been automated. The process also needs to adapt as more data is contributed to the BPD and as building technologies over time. The data preparation process is an essential step between data contributed by providers and data published to the public in the BPD.

  18. Multi-Criteria Approach in Multifunctional Building Design Process

    Science.gov (United States)

    Gerigk, Mateusz

    2017-10-01

    The paper presents new approach in multifunctional building design process. Publication defines problems related to the design of complex multifunctional buildings. Currently, contemporary urban areas are characterized by very intensive use of space. Today, buildings are being built bigger and contain more diverse functions to meet the needs of a large number of users in one capacity. The trends show the need for recognition of design objects in an organized structure, which must meet current design criteria. The design process in terms of the complex system is a theoretical model, which is the basis for optimization solutions for the entire life cycle of the building. From the concept phase through exploitation phase to disposal phase multipurpose spaces should guarantee aesthetics, functionality, system efficiency, system safety and environmental protection in the best possible way. The result of the analysis of the design process is presented as a theoretical model of the multifunctional structure. Recognition of multi-criteria model in the form of Cartesian product allows to create a holistic representation of the designed building in the form of a graph model. The proposed network is the theoretical base that can be used in the design process of complex engineering systems. The systematic multi-criteria approach makes possible to maintain control over the entire design process and to provide the best possible performance. With respect to current design requirements, there are no established design rules for multifunctional buildings in relation to their operating phase. Enrichment of the basic criteria with functional flexibility criterion makes it possible to extend the exploitation phase which brings advantages on many levels.

  19. Estimating HAPs and radionuclide emissions from a laboratory complex at a nuclear processing site

    International Nuclear Information System (INIS)

    Paul, R.A.; Faugl, T.

    1993-01-01

    A unique methodology was developed for conducting an air emission inventory (AEI) at a DOE nuclear processing facility. This methodology involved the use of computer-assisted design (CAD) drawings to document emission points, computerized process drawings to document industrial processes leading to emissions, and a computerized data base of AEI forms to document emission estimates and related process data. A detailed air emissions inventory for operating years 1985--1991 was recently implemented for the entire site using this methodology. One industrial area at the DOE Site is comprised of laboratory facilities that provide direct support to the nuclear reactor and recovery operations, developmental studies to support reactor and separation operations, and developmental studies to support waste handling and storage. The majority of the functions are conducted in a single large building complex wherein bench scale and pilot scale experiments are carried out involving radionuclides, hazardous air pollutants (HAP), and other chemicals reportable under the Clean Air Act Amendments (CAAA) and Superfund Amendments and Re-authorization Act (SARA) Title 111. The results of the inventory showed that HAP and radionuclide emissions from the laboratory complex were relatively minor

  20. Polymer Processing and Characterization Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — The purpose is to process and evaluate polymers for use in nonlinear optical, conductive and structural Air Force applications. Primary capabilities are extrusion of...

  1. U.S. Department of Energy Commercial Reference Building Models of the National Building Stock

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Studer, D.; Benne, K.; Griffith, B.; Torcellini, P.; Liu, B.; Halverson, M.; Winiarski, D.; Rosenberg, M.; Yazdanian, M.; Huang, J.; Crawley, D.

    2011-02-01

    The U.S. Department of Energy (DOE) Building Technologies Program has set the aggressive goal of producing marketable net-zero energy buildings by 2025. This goal will require collaboration between the DOE laboratories and the building industry. We developed standard or reference energy models for the most common commercial buildings to serve as starting points for energy efficiency research. These models represent fairly realistic buildings and typical construction practices. Fifteen commercial building types and one multifamily residential building were determined by consensus between DOE, the National Renewable Energy Laboratory, Pacific Northwest National Laboratory, and Lawrence Berkeley National Laboratory, and represent approximately two-thirds of the commercial building stock.

  2. Simulation Technology Laboratory Building 970 hazards assessment document

    International Nuclear Information System (INIS)

    Wood, C.L.; Starr, M.D.

    1994-11-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Simulation Technology Laboratory, Building 970. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distances at which a postulated facility event will produce consequences exceeding the ERPG-2 and Early Severe Health Effects thresholds are 78 and 46 meters, respectively. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 100 meters

  3. Highlighting High Performance: National Renewable Energy Laboratory's Thermal Test Facility, Golden, Colorado. Office of Building Technology State and Community Programs (BTS) Brochure

    International Nuclear Information System (INIS)

    Burgert, S.

    2001-01-01

    The National Renewable Energy Laboratory's Thermal Test Facility in Golden, Colorado, was designed using a whole-building approach-looking at the way the building's systems worked together most efficiently. Researchers monitor the performance of the 11,000-square-foot building, which boasts an energy cost savings of 63% for heating, cooling, and lighting. The basic plan of the building can be adapted to many needs, including retail and warehouse space. The Thermal Test Facility contains office and laboratory space; research focuses on the development of energy-efficiency and renewable energy technologies that are cost-effective and environmentally friendly

  4. Characterizing the Laboratory Market

    Energy Technology Data Exchange (ETDEWEB)

    Shehabi, Arman [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ganeshalingam, Mohan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); DeMates, Lauren [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sartor, Dale [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-11

    Laboratories are estimated to be 3-5 times more energy intensive than typical office buildings and offer significant opportunities for energy use reductions. Although energy intensity varies widely, laboratories are generally energy intensive due to ventilation requirements, the research instruments used, and other health and safety concerns. Because the requirements of laboratory facilities differ so dramatically from those of other buildings, a clear need exists for an initiative exclusively targeting these facilities. The building stock of laboratories in the United States span different economic sectors, include governmental and academic institution, and are often defined differently by different groups. Information on laboratory buildings is often limited to a small subsection of the total building stock making aggregate estimates of the total U.S. laboratories and their energy use challenging. Previous estimates of U.S. laboratory space vary widely owing to differences in how laboratories are defined and categorized. A 2006 report on fume hoods provided an estimate of 150,000 laboratories populating the U.S. based in part on interviews of industry experts, however, a 2009 analysis of the 2003 Commercial Buildings Energy Consumption Survey (CBECS) generated an estimate of only 9,000 laboratory buildings. This report draws on multiple data sources that have been evaluated to construct an understanding of U.S. laboratories across different sizes and markets segments. This 2016 analysis is an update to draft reports released in October and December 2016.

  5. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  6. Realizing High-Performance Buildings; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-02

    High-performance buildings (HPBs) are exceptional examples of both design and practice. Their energy footprints are small, and these are buildings that people want to work in because of their intelligent structure, operations, and coincident comfort. However, the operation of most buildings, even ones that are properly constructed and commissioned at the start, can deviate significantly from the original design intent over time, particularly due to control system overrides and growing plug and data center loads. With early planning for systems such as submetering and occupant engagement tools, operators can identify and remedy the problems. This guide is a primer for owners and owners’ representatives who are pursuing HPBs. It describes processes that have been successful in the planning, procurement, and operation of HPBs with exceptional energy efficiency. Much of the guidance offered results from a series of semi-structured conference calls with a technical advisory group of 15 owners and operators of prominent HPBs in the United States. The guide provides a prescription for planning, achieving, and maintaining an HPB. Although the guide focuses on the operations stage of buildings, many of the operations practices are specified during the planning stage.

  7. Biosafety and Biosecurity: A Relative Risk-Based Framework for Safer, More Secure, and Sustainable Laboratory Capacity Building

    OpenAIRE

    Dickmann, Petra; Sheeley, Heather; Lightfoot, Nigel

    2015-01-01

    Background Laboratory capacity building is characterized by a paradox between endemicity and resources: countries with high endemicity of pathogenic agents often have low and intermittent resources (water, electricity) and capacities (laboratories, trained staff, adequate regulations). Meanwhile, countries with low endemicity of pathogenic agents often have high-containment facilities with costly infrastructure and maintenance governed by regulations. The common practice of exporting high ...

  8. Biosafety and Biosecurity: A relative risk-based framework for safer, more secure and sustainable laboratory capacity building

    OpenAIRE

    Petra eDickmann; Heather eSheeley; Nigel Francis Lightfoot; Nigel Francis Lightfoot

    2015-01-01

    Background: Laboratory capacity building is characterized by a paradox between endemicity and resources: Countries with high endemicity of pathogenic agents often have low and intermittent resources (water, electricity) and capacities (laboratories, trained staff, adequate regulations). Meanwhile, countries with low endemicity of pathogenic agents often have high containment facilities with costly infrastructure and maintenance governed by regulations. The common practice of exporting high bi...

  9. Analysis of environmental contamination resulting from catastrophic incidents: part 1. Building and sustaining capacity in laboratory networks.

    Science.gov (United States)

    Magnuson, Matthew; Ernst, Hiba; Griggs, John; Fitz-James, Schatzi; Mapp, Latisha; Mullins, Marissa; Nichols, Tonya; Shah, Sanjiv; Smith, Terry; Hedrick, Elizabeth

    2014-11-01

    Catastrophic incidents, such as natural disasters, terrorist attacks, and industrial accidents, can occur suddenly and have high impact. However, they often occur at such a low frequency and in unpredictable locations that planning for the management of the consequences of a catastrophe can be difficult. For those catastrophes that result in the release of contaminants, the ability to analyze environmental samples is critical and contributes to the resilience of affected communities. Analyses of environmental samples are needed to make appropriate decisions about the course of action to restore the area affected by the contamination. Environmental samples range from soil, water, and air to vegetation, building materials, and debris. In addition, processes used to decontaminate any of these matrices may also generate wastewater and other materials that require analyses to determine the best course for proper disposal. This paper summarizes activities and programs the United States Environmental Protection Agency (USEPA) has implemented to ensure capability and capacity for the analysis of contaminated environmental samples following catastrophic incidents. USEPA's focus has been on building capability for a wide variety of contaminant classes and on ensuring national laboratory capacity for potential surges in the numbers of samples that could quickly exhaust the resources of local communities. USEPA's efforts have been designed to ensure a strong and resilient laboratory infrastructure in the United States to support communities as they respond to contamination incidents of any magnitude. The efforts include not only addressing technical issues related to the best-available methods for chemical, biological, and radiological contaminants, but also include addressing the challenges of coordination and administration of an efficient and effective response. Laboratory networks designed for responding to large scale contamination incidents can be sustained by applying

  10. Alternatives evaluation for the decontamination and decommissioning of buildings 3506 and 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-01-01

    This is an alternative evaluation document that records the evaluation process and justification for choosing the alternative recommended for the decontamination and decommissioning (D ampersand D) of the 3506 and 3515 buildings at the Oak Ridge National Laboratory (ORNL). The alternatives for the D ampersand D of the two buildings were: (1) no action (continued surveillance and maintenance), (2) decontamination for free release, (3) entombment in place, (4) partial dismantlement, and (5) complete dismantlement. Soil remediation is not included in any of the alternatives. The recommended alternative for the D ampersand D of Building 3506 is partial dismantlement at an estimated cost of $936, 000 in escalated dollars. The cost estimate for complete dismantlement is $1,384,000. The recommended alternative for the D ampersand D of Building 3515 is complete dismantlement at an estimated cost of $3,733,000 in escalated dollars. This alternative is recommended, because the soils below the foundation of the 3515 building are highly contaminated, and removing the foundation in the D ampersand D project results in lower overall worker risk, costs, and improved post-D ampersand D site conditions. A further recommendation is to revise these cost estimates after the conclusion of the ongoing characterization study. The results of the characterization of the two buildings is expected to change some of the assumptions and resolve some of the uncertainties in the development of these estimates

  11. Manufacturing of NAA laboratory clean room

    International Nuclear Information System (INIS)

    Suwoto; Hasibuan, Djaruddin

    2001-01-01

    The ''NAA laboratory clean room'' has been built in the Reactor Serba Guna G.A. Siwabessy building. The erection of ''AAN laboratory clean room'' doing by started of preparation of the ''manufacturing procedure'' refer to ''Design and manufacturing neutron activation analysis clean room laboratory''. Manufacturing process and erection doing refer to procedures makes. By providing of the ''AAN laboratory clean room'' can be cocluded that the research activity and the user sevises in P2TRR well meet to be done

  12. Effectiveness of daylighting design and occupant visual satisfaction in a LEED gold laboratory building

    Energy Technology Data Exchange (ETDEWEB)

    Hua, Ying; Oswald, Anne [Department of Design and Environmental Analysis, Cornell University, Ithaca, NY 14853 (United States); Yang, Xiaodi [School of Architecture, Carnegie Mellon University, Pittsburgh, PA 15213 (United States)

    2011-01-15

    Using daylight as primary light source has been widely recognized as an important strategy to reduce building energy demand and enhance indoor environment quality. However, to design and operate a building to make full use of daylight, which is a dynamic light source, to meet diverse occupant needs remains a challenge. This paper reports a post-occupancy study of the visual environment in a laboratory building on a university campus, and puts a spotlight on the building occupants as it examines the effectiveness of the daylighting design and systems integration in creating a visual environment to support occupant comfort and satisfaction while reducing artificial lighting demand. Results show generally high satisfaction with daylit work environment and positive effect of the horizontal shading strategy. Issues about the integration between daylighting and electric lighting systems and level of occupant control are identified and discussed for improving the effectiveness of daylighting and enhancing the quality of the visual environment in the building of study. A multiple-tool methodology is developed and tested, which included occupant surveys, interviews, illuminance measurements, continuous data loggers, fisheye-lens camera and glare-identifying software, and documentation of spatial settings, systems features, and user behavior. (author)

  13. [Building and implementation of management system in laboratories of the National Institute of Hygiene].

    Science.gov (United States)

    Rozbicka, Beata; Brulińska-Ostrowska, Elzbieta

    2008-01-01

    The rules of good laboratory practice have always been observed in the laboratories of National Institute of Hygiene (NIH) and the reliability of the results has been carefully cared after when performing tests for clients. In 2003 the laboratories performing analyses related to food safety were designated as the national reference laboratories. This, added to the necessity of compliance with work standards and requirements of EU legislation and to the need of confirmation of competence by an independent organisation, led to a decision to seek accreditation of Polish Centre of Accreditation (PCA). The following stages of building and implementation of management system were presented: training, modifications of Institute's organisational structure, elaboration of management system's documentation, renovation and refurbishment of laboratory facilities, implementation of measuring and test equipment's supervision, internal audits and management review. The importance of earlier experiences and achievements with regard to validation of analytical methods and guarding of the quality of the results through organisation and participation in proficiency tests was highlighted. Current status of accreditation of testing procedures used in NIH laboratories that perform analyses in the field of chemistry, microbiology, radiobiology and medical diagnostic tests was presented.

  14. Characterizing polycyclic aromatic hydrocarbon build-up processes on urban road surfaces

    International Nuclear Information System (INIS)

    Liu, Liang; Liu, An; Li, Dunzhu; Zhang, Lixun; Guan, Yuntao

    2016-01-01

    Reliable prediction models are essential for modeling pollutant build-up processes on urban road surfaces. Based on successive samplings of road deposited sediments (RDS), this study presents empirical models for mathematical replication of the polycyclic aromatic hydrocarbon (PAH) build-up processes on urban road surfaces. The contaminant build-up behavior was modeled using saturation functions, which are commonly applied in US EPA's Stormwater Management Model (SWMM). Accurate fitting results were achieved in three typical urban land use types, and the applicability of the models was confirmed based on their acceptable relative prediction errors. The fitting results showed high variability in PAH saturation value and build-up rate among different land use types. Results of multivariate data and temporal-based analyses suggested that the quantity and property of RDS significantly influenced PAH build-up. Furthermore, pollution sources, traffic parameters, road surface conditions, and sweeping frequency could synthetically impact the RDS build-up and RDS property change processes. Thus, changes in these parameters could be the main reason for variations in PAH build-up in different urban land use types. - Highlights: • Sufficient robust prediction models were established for analysis of PAH build-up on urban road surfaces. • PAH build-up processes showed high variability among different land use types. • Pollution sources as well as the quantity and property of RDS mainly influenced PAH build-up. - Sufficient robust prediction models were established for analysis of PAH build-up on urban road surfaces. Pollution sources as well as the quantity and property of RDS mainly influenced PAH build-up.

  15. Low-Level, Measured Response of Los Alamos National Laboratories TA 16 - Building 411 and TA 8 - Building 23 to Direct Flash Attachment of Lightning

    International Nuclear Information System (INIS)

    Dinallo, Michael A.; Holmes, Parris; Merewether, Kimball O.; Morris, Marvin E.

    1999-01-01

    On September 24, 25, 28, and 29, 1998 and on October 19 and 23, 1998, transfer impedance measurements were made on Los Alamos National Laboratories TA 16 - Building 411 and TA 8-- Building 23 to characterize their interior open-circuit voltage response to a direct lightning flash attachment to the structures. The theory, history, measurement methods and equipment, and specific measured results are detailed. The measured results demonstrate that if the remaining metallic penetrations are bonded, then the rebar of the two structures is sufficiently well connected to form a Faraday cage that reduces the maximum open-circuit voltage inside the structure to a sufficiently low level that the required standoff distance to prevent arcing to explosive assemblies is 6.8 inches for TA 16 - Building 411 and is 11.5 inches for TA 8 - Building 23

  16. Derived concentration guideline levels for Argonne National Laboratory's building 310 area.

    Energy Technology Data Exchange (ETDEWEB)

    Kamboj, S., Dr.; Yu, C ., Dr. (Environmental Science Division)

    2011-08-12

    The derived concentration guideline level (DCGL) is the allowable residual radionuclide concentration that can remain in soil after remediation of the site without radiological restrictions on the use of the site. It is sometimes called the single radionuclide soil guideline or the soil cleanup criteria. This report documents the methodology, scenarios, and parameters used in the analysis to support establishing radionuclide DCGLs for Argonne National Laboratory's Building 310 area.

  17. Los Alamos Scientific Laboratory building cost index

    International Nuclear Information System (INIS)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL

  18. Los Alamos Scientific Laboratory building cost index

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, G.D.; Morris, D.W.; McConnell, P.H.

    1977-11-01

    The Controller's budget request for FY-1979 established guidance for escalation rates at 6 to 8 percent for construction projects beyond FY-1976. The Los Alamos Scientific Laboratory (LASL) has chosen to use an annual construction escalation rate of 10 percent. Results of this study should contribute toward the establishment of realistic construction cost estimate totals and estimates of annual construction funding requirements. Many methods were used to arrive at the LASL escalation rate recommendation. First, a computer program was developed which greatly expanded the number of materials previously analyzed. The program calculated the 1970 to 76 weighted averages for labor, materials, and equipment for the base line project. It also plotted graphs for each category and composite indexes for labor and material/equipment. Second, estimated increases for 1977 were obtained from several sources. The Zia Company provided labor cost estimates. Projected increases for material and equipment were obtained through conversations with vendors and analysis of trade publications. Third, economic forecast reports and the Wall Street Journal were used for source material, narrative, and forecast support. Finally, we compared LASL Building Cost Index with the effects of escalation associated with three recently developed projects at LASL.

  19. Business Process Innovation using the Process Innovation Laboratory

    DEFF Research Database (Denmark)

    Møller, Charles

    for practical applications has not been identified. The aim of this paper is to establish a conceptual framework for business process innovation in the supply chain based on advanced enterprise systems. The main approach to business process innovation in this context is to create a new methodology for exploring...... process models and patterns of applications. The paper thus presents a new concept for business process innovation called the process innovation laboratory a.k.a. the ?-Lab. The ?-Lab is a comprehensive framework for BPI using advanced enterprise systems. The ?-Lab is a collaborative workspace...... for experimenting with process models and an explorative approach to study integrated modeling in a controlled environment. The ?-Lab facilitates innovation by using an integrated action learning approach to process modeling including contemporary technological, organizational and business perspectives....

  20. DECOMMISSIONING THE HIGH PRESSURE TRITIUM LABORATORY AT LOS ALAMOS NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    Peifer, M.J.; Rendell, K.; Hearnsberger, D.W.

    2003-01-01

    In May 0f 2000, the Cerro Grande wild land fire burned approximately 48,000 acres in and around Los Alamos. In addition to the many buildings that were destroyed in the town site, many structures were also damaged and destroyed within the 43 square miles that comprise the Los Alamos National Laboratory (LANL). A special Act of Congress provided funding to remove Laboratory structures that were damaged by the fire, or that could be threatened by subsequent catastrophic wild land fires. The High Pressure Tritium Laboratory (HPTL) is located at Technical Area (TA) 33, building 86 in the far southeast corner of the Laboratory property. It is immediately adjacent to Bandelier National Park. Because it was threatened by both the Cerro Grande fire in 2000, and the 16,000- acre Dome fire in 1996, the former tritium processing facility was placed on the list of facilities scheduled for Decontamination and Decommissioning under the Cerro Grande Rehabilitation Project. The work was performed through the Facilities and Waste Operations (FWO) Division and is integrated with other Laboratory D and D efforts. The primary demolition contractor was Clauss Construction of San Diego, California. Earth Tech Global Environmental Services of San Antonio, Texas was sub-contracted to Clauss Construction, and provided radiological decontamination support to the project. Although the forty-seven year old facility had been in a state of safe-shutdown since operations ceased in 1990, a significant amount of tritium remained in the rooms where process systems were located. Tritium was the only radiological contaminant associated with this facility. Since no specific regulatory standards have been set for the release of volumetrically contaminated materials, concentration guidelines were derived in order to meet other established regulatory criteria. A tritium removal system was developed for this project with the goal of reducing the volume of tritium concentrated in the concrete of the

  1. Office Buildings: Assessing and Reducing Plug and Process Loads in Office Buildings (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-04-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

  2. Retail Buildings: Assessing and Reducing Plug and Process Loads in Retail Buildings (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-04-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in retail spaces are poorly understood.

  3. Characterization report for Buildings 3706 and 37006A

    International Nuclear Information System (INIS)

    Smith, D.S.

    1997-06-01

    The 3706 and 3706A Buildings were originally constructed to perform small-scale experiments in support of all Hanford Engineering Works production activities. The primary focus was to perform radiochemical trials aimed at improving the bismuth phosphate process. The facility housed 19 offices, 2 shops, a dark room, 2 storerooms, a lunchroom, locker room, ventilating equipment room, sanitary restrooms, and 57 laboratories, including a special laboratory with 0.6-m-(2-ft) thick concrete walls reserved for the hottest analytical work. The 3706 Building was decontaminated and remodeled in 1954 and 1955, and many of the laboratories were converted to offices at that time. By 1964, the facility was called the General Services Building, and although it still contained some analytical laboratories, the majority of the space was devoted to mail, duplicating, photographic, and drafting services; a first aid station, and the 300 Area Hanford Patrol headquarters. All laboratory work was eventually phased out by the end of the 1980's. The primary objective of the characterization activities described in this report is to properly designate the building debris waste in preparation for demolition of the building and disposal at the Environmental Restoration Disposal Facility Waste. The scope of services for this characterization project included the following tasks: historical records review; facility inspection; radiological surveys; data quality objective; sampling and analysis instruction; field sampling and laboratory analysis; preparation of this characterization report

  4. Decommissioning the physics laboratory, building 777-10A, at the Savannah River Site (SRS)

    International Nuclear Information System (INIS)

    Musall, John C.; Cope, Jeff L.

    2008-01-01

    SRS recently completed a four year mission to decommission ∼250 excess facilities. As part of that effort, SRS decommissioned a 48,000 ft 2 laboratory that housed four low-power test reactors, formerly used by SRS to determine reactor physics. This paper describes and reviews the decommissioning, with a focus on component segmentation and handling (i.e. hazardous material removal, demolition, and waste handling). The paper is intended to be a resource for engineers, planners, and project managers, who face similar decommissioning challenges. Building 777-10A, located at the south end of SRS's A/M-Area, was built in 1953 and had a gross area of ∼48,000 ft 2 . Building 777-10A had two main areas: a west wing, which housed four experimental reactors and associated equipment; and an east wing, which housed laboratories, and shops, offices. The reactors were located in two separate areas: one area housed the Process Development Pile (PDP) reactor and the Lattice Test Reactor (LTR), while the second area housed the Standard Pile (SP) and the Sub-critical Experiment (SE) reactors. The west wing had five levels: three below and three above grade (floor elevations of -37', -28', -15', 0', +13'/+16' and +27' (roof elevation of +62')), while the east wing had two levels: one below and one above grade (floor elevations of -15' and 0' (roof elevation of +16')). Below-grade exterior walls were constructed of reinforced concrete, ∼1' thick. In general, above-grade exterior walls were steel frames covered by insulation and corrugated, asbestos-cement board. The two interior walls around the PDP/LTR were reinforced concrete ∼5' thick and ∼30' high, while the SP/SE reactors resided in a reinforced, concrete cell with 3.5'-6' thick walls/roof. All other interior walls were constructed of metal studs covered with either asbestos-cement or gypsum board. In general, the floors were constructed of reinforced concrete on cast-in-place concrete beams below-grade and concrete on

  5. Building trust and confidence in laboratory ES and H policy and practices

    Energy Technology Data Exchange (ETDEWEB)

    Graf, J.

    2000-08-01

    This report describes a successful pilot event among LANL employees that can see as a model for employee involvement and community input. The conference was designed to begin building trust and confidence in Laboratory policy and practices in the area of Environment, Safety, and Health (ES and H). It represents a concrete step toward fostering better relationships among Lab employees and creating a new, innovative approach to communication that can also be used to build trust in the larger community. Based on the proven methods of the National Issues Forums and the Jefferson Center Citizen Jury Process, this conference enabled management to learn more about the thoughts and advice of LANL employees, During the course of the day, a random sample of Lab employees representing the LANL workforce learned about issues of health, safety and the environment, and some of the options available to increase trustworthiness in these areas. These Employee Advisors then discussed the options at some length and presented recommendations to senior Lab managers in the role of Decision Makers. At the end of the day, the participants offered their reflections and discussed what they learned during the conference, and Decision Makers responded to what they heard. The most common view expressed by the Employee Advisors was that a bottom-up approach was necessary to develop more relevant ES and H policies. They were unanimous in their desire for more employee inclusion into the decision making process. All Employee Advisors were in support of a Lab wide survey to determine employee concerns about ES and H issues. After listening to the deliberation, the Decision Makers responded with several commitments. The most significant was the pledge to meet with Employee Advisors by the end of February to discuss the status of their recommendations on ES and H policy and practices. The ensuing follow-up meeting explored employee concerns in greater depth resulting in forward-looking action steps

  6. Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004-2012.

    Science.gov (United States)

    Hamel, Donald J; Sankalé, Jean-Louis; Samuels, Jay Osi; Sarr, Abdoulaye D; Chaplin, Beth; Ofuche, Eke; Meloni, Seema T; Okonkwo, Prosper; Kanki, Phyllis J

    From 2004-2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President's Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform and encourage the development of other laboratories in resource-limited settings.

  7. Health and safety consequences of medical isotope processing at the Hanford Site 325 building

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, D. L.

    1997-11-19

    Potential activities associated with medical isotope processing at the Hanford Site 325 Building laboratory and hot cell facilities are evaluated to assess the health and safety consequences if these activities are to be implemented as part of a combined tritium and medical isotope production mission for the Fast Flux Text Facility (FFTF). The types of activities included in this analysis are unloading irradiated isotope production assemblies at the 325 Building, recovery and dissolution of the target materials, separation of the product isotopes as required, and preparation of the isotopes for shipment to commercial distributors who supply isotopes to the medical conunuriity. Possible consequences to members of the public and to workers from both radiological and non-radiological hazards are considered in this evaluation. Section 2 of this docinnent describes the assumptions and methods used for the health and safety consequences analysis, section 3 presents the results of the analysis, and section 4 summarizes the results and conclusions from the analysis.

  8. Decommissioning of surplus facilities at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Stout, D.S.

    1995-01-01

    Decommissioning Buildings 3 and 4 South at Technical Area 21, Los Alamos National Laboratory, involves the decontamination, dismantlement, and demolition of two enriched-uranium processing buildings containing process equipment and ductwork holdup. The Laboratory has adopted two successful management strategies to implement this project: Rather than characterize an entire site, upfront, investigators use the ''observational approach,'' in which they collect only enough data to begin decommissioning activities and then determine appropriate procedures for further characterization as the work progresses. Project leaders augment work packages with task hazard analyses to fully define specific tasks and inform workers of hazards; all daily work activities are governed by specific work procedures and hazard analyses

  9. Plasma separation process: Magnet move to Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1989-07-01

    This is the final report on the series of operations which culminated with the delivery of the Plasma Separation Process prototype magnet system (PMS) to Building K1432 at Oak Ridge National Laboratory (ORNL). This procedure included real time monitoring of the cold mass support strut strain gauges and an in-cab rider to monitor the instrumentation and direct the driver. The primary technical consideration for these precautions was the possibility of low frequency resonant vibration of the cold mass when excited by symmetrical rough road conditions at specific speeds causing excess stress levels in the support struts and consequent strut failure. A secondary consideration was the possibility of high acceleration loads due to sudden stops, severe road conditions, of impacts. The procedure for moving and transportation to ORNL included requirements for real time continuous monitoring of the eight strut stain gauges and three external accelerometers. Because the strain gauges had not been used since the original magnet cooldown, it was planned to verify their integrity during magnet warmup. The measurements made from the strut strain gauges resulted in stress values that were physically impossible. It was concluded that further evaluation was necessary to verify the usefulness of these gauges and whether they might be faulty. This was accomplished during the removal of the magnet from the building. 6 figs., 1 tab

  10. Biomedical laboratories: architecture and radioprotection principles

    International Nuclear Information System (INIS)

    Lapa, Renata

    2005-01-01

    In institutions where biological research are made and some technologies make use of radioisotope, the radiation protection is an issue of biosecurity for conceptual reasons. In the process of architectural design of Biomedical Laboratories, engineering and architecture reveal interfaces with other areas of knowledge and specific concepts. Exploring the role of architectural design in favor of personal and environmental protection in biological containment laboratories that handle non-sealed sources in research, the work discusses the triad that compose the principle of containment in health environments: best practices, protective equipment, physical facilities, with greater emphasis on the latter component. The shortcomings of the design process are reflected in construction and in use-operation and maintenance of these buildings, with direct consequences on the occupational health and safety, environmental and credibility of work processes. In this context, the importance of adoption of alternatives to improve the design process is confirmed, taking into account the early consideration of several variables involved and providing subsidies to the related laboratories . The research, conducted at FIOCRUZ - a Brazilian health institution, developed from the analysis of the participants in the architectural project, aiming at the formulation of design guidelines which could contribute to the rationalisation of this kind of building construction

  11. Components of laboratory accreditation.

    Science.gov (United States)

    Royal, P D

    1995-12-01

    Accreditation or certification is a recognition given to an operation or product that has been evaluated against a standard; be it regulatory or voluntary. The purpose of accreditation is to provide the consumer with a level of confidence in the quality of operation (process) and the product of an organization. Environmental Protection Agency/OCM has proposed the development of an accreditation program under National Environmental Laboratory Accreditation Program for Good Laboratory Practice (GLP) laboratories as a supplement to the current program. This proposal was the result of the Inspector General Office reports that identified weaknesses in the current operation. Several accreditation programs can be evaluated and common components identified when proposing a structure for accrediting a GLP system. An understanding of these components is useful in building that structure. Internationally accepted accreditation programs provide a template for building a U.S. GLP accreditation program. This presentation will discuss the traditional structure of accreditation as presented in the Organization of Economic Cooperative Development/GLP program, ISO-9000 Accreditation and ISO/IEC Guide 25 Standard, and the Canadian Association for Environmental Analytical Laboratories, which has a biological component. Most accreditation programs are managed by a recognized third party, either privately or with government oversight. Common components often include a formal review of required credentials to evaluate organizational structure, a site visit to evaluate the facility, and a performance evaluation to assess technical competence. Laboratory performance is measured against written standards and scored. A formal report is then sent to the laboratory indicating accreditation status. Usually, there is a scheduled reevaluation built into the program. Fee structures vary considerably and will need to be examined closely when building a GLP program.

  12. Low-level waste drum staging building at Weapons Engineering Tritium Facility, TA-16, Los Alamos National Laboratory, Los Alamos, New Mexico. Environmental Assessment

    International Nuclear Information System (INIS)

    1994-08-01

    The proposed action is to place a 3 meter (m) by 4.5 m (10 ft x 15 ft) prefabricated storage building (transportainer) adjacent to the existing Weapons Engineering Tritium Facility (WETF) at Technical Area (TA-) 16, Los Alamos National Laboratory (LANL), and to use the building as a staging site for sealed 55 galllon drums of noncompactible waste contaminated with low levels of tritium (LLW). Up to eight drums of waste would be accumulated before the waste is moved by LANL Waste Management personnel to the existing on-site LLW disposal area at TA-54. The drum staging building would be placed on a bermed asphalt pad, near other existing accumulation structures for office trash and compactible LLW. The no-action alternative is to continue storing drums of LLW in the WETF laboratories where they occupy valuable work space, hamper movement of personnel and equipment, and require waste management personnel to enter those laboratories in order to remove filled drums. No new waste would be generated by implementing the proposed action; no changes or increases in WETF operations or waste production rate are anticipated as a result of staging drums of LLW outside the main laboratory building. The site for the LLW drum staging building would not impact any sensitive areas. Tritium emissions from the drums of LLW were included within the source term for normal operations at the WETF; the cumulative impacts would not be increased

  13. MANAGING THE BUILDING DESIGN PROCESS FOR SUSTAINABILTY AND IMPROVED QUALITY

    Directory of Open Access Journals (Sweden)

    Sunday Bobadoye

    2006-01-01

    Full Text Available The essence of building design process and management for building sustainability in the creation and maintenance of a qualitative architectural product is investigated in this paper. The design process, concept of building sustainability and particularly the quality of the built environment are discussed. Akure, a state capital in Nigeria was used as a case study. The principles and indicators for sustainability of buildings and its implications on the quality of the environment are examined in details. Survey findings include the views of the professionals on the clients, perception on the design process as well as management of projects, and the implications on the quality of the ensuring products and the city’s environment. The data were factor analyzed using varimax rotation criterion (with Kaiser Normalization. The results revealed that five factors were effective, with one of them exhibiting the greatest variability and individual differences. The variables that loaded on this factor were really the aspects of the process and management relating to the clients. The findings also revealed the professionals’ wrong attitude towards design process as shown with a very high degree of variability in the study. The paper concludes by recommending the enactment and enforcement of relevant policies with adequate education of the people and the involvement of all the stakeholders in the management of building projects and environmental programmes for the realization of a qualitative architectural product.

  14. Mapping the Capacity Building Process of a Corporate Social ...

    African Journals Online (AJOL)

    The result of data analysis shows that, 75% of the respondents indicated they needed practical capacity building for effective project management and sustainability. The findings support a dire need for participatory evaluation on strategies towards the improvement of capacity building process service delivery. Key Words: ...

  15. Confirmatory radiological survey of the BORAX-V turbine building Idaho National Engineering Laboratory, Idaho Falls, Idaho

    International Nuclear Information System (INIS)

    Stevens, G.H.; Coleman, R.L.; Jensen, M.K.; Pierce, G.A.; Egidi, P.V.; Mather, S.K.

    1993-01-01

    An independent assessment of the remediation of the BORAX-V (Boiling Water Reactor Experiment) turbine building at the Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho, was accomplished by the Oak Ridge National Laboratory Pollutant Assessments Group (ORNL/PAG). The purpose of the assessment was to confirm the site's compliance with applicable Department of Energy guidelines. The assessment included reviews of both the decontamination and decommissioning Plan and data provided from the pre- and post-remedial action surveys and an independent verification survey of the facility. The independent verification survey included determination of background exposure rates and soil concentrations, beta-gamma and gamma radiation scans, smears for detection of removable contamination, and direct measurements for alpha and beta-gamma radiation activity on the basement and mezzanine floors and the building's interior and exterior walls. Soil samples were taken, and beta-gamma and gamma radiation exposure rates were measured on areas adjacent to the building. Results of measurements on building surfaces at this facility were within established contamination guidelines except for elevated beta-gamma radiation levels located on three isolated areas of the basement floor. Following remediation of these areas, ORNL/PAG reviewed the remedial action contractor's report and agreed that remediation was effective in removing the source of the elevated direct radiation. Results of all independent soil analyses for 60 Co were below the detection limit. The highest 137 Cs analysis result was 4.6 pCi/g; this value is below the INEL site-specific guideline of 10 pCi/g

  16. Defense Waste Processing Facility prototypic analytical laboratory

    International Nuclear Information System (INIS)

    Policke, T.A.; Bryant, M.F.; Spencer, R.B.

    1991-01-01

    The Defense Waste Processing Technology (DWPT) Analytical Laboratory is a relatively new laboratory facility at the Savannah River Site (SRS). It is a non-regulated, non-radioactive laboratory whose mission is to support research and development (R ampersand D) and waste treatment operations by providing analytical and experimental services in a way that is safe, efficient, and produces quality results in a timely manner so that R ampersand D personnel can provide quality technical data and operations personnel can efficiently operate waste treatment facilities. The modules are sample receiving, chromatography I, chromatography II, wet chemistry and carbon, sample preparation, and spectroscopy

  17. Glass Formulation and Fabrication Laboratory, Building 864, Hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Banda, Z.; Wood, C.L.

    1995-08-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Glass Formulation and Fabrication Laboratory, Building 864. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distances at which a postulated facility event will produce consequences exceeding the ERPG-2 threshold is 96 meters. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 100 meters.

  18. Potential of Laboratory Execution Systems (LESs) to Simplify the Application of Business Process Management Systems (BPMSs) in Laboratory Automation.

    Science.gov (United States)

    Neubert, Sebastian; Göde, Bernd; Gu, Xiangyu; Stoll, Norbert; Thurow, Kerstin

    2017-04-01

    Modern business process management (BPM) is increasingly interesting for laboratory automation. End-to-end workflow automation and improved top-level systems integration for information technology (IT) and automation systems are especially prominent objectives. With the ISO Standard Business Process Model and Notation (BPMN) 2.X, a system-independent and interdisciplinary accepted graphical process control notation is provided, allowing process analysis, while also being executable. The transfer of BPM solutions to structured laboratory automation places novel demands, for example, concerning the real-time-critical process and systems integration. The article discusses the potential of laboratory execution systems (LESs) for an easier implementation of the business process management system (BPMS) in hierarchical laboratory automation. In particular, complex application scenarios, including long process chains based on, for example, several distributed automation islands and mobile laboratory robots for a material transport, are difficult to handle in BPMSs. The presented approach deals with the displacement of workflow control tasks into life science specialized LESs, the reduction of numerous different interfaces between BPMSs and subsystems, and the simplification of complex process modelings. Thus, the integration effort for complex laboratory workflows can be significantly reduced for strictly structured automation solutions. An example application, consisting of a mixture of manual and automated subprocesses, is demonstrated by the presented BPMS-LES approach.

  19. ANALYTIC HIERARCHY PROCESS: AN APPLICATION IN GREEN BUILDING MARKET RESEARCH

    Directory of Open Access Journals (Sweden)

    Sharmin Attaran

    2013-01-01

    Full Text Available Sustainability has become a necessity in the building industry. In recent years, as the general public is more informed and aware of sustainability related issues, they are becoming major players in the decision making process regarding their built environment. However, there are still challenges with how sustainability is communicated to occupants and owners of buildings. As the global economic crisis is continuing, the marketing of green buildings needs to be refined to communicate the lifetime benefits of sustainability. One of the ways to develop effective marketing strategies, is to understand what the occupants value the most among many aspects of green buildings thus develop focused marketing solutions. Authors present a conceptual methodology using Analytic Hierarchy Process toward identifying consumer ranking and weights of a major green building rating system’s categories. Authors use sample non-representative data to illustrate the proposed methodology, while sharing preliminary qualitative data from the research in progress.

  20. Flood vulnerability assessment of residential buildings by explicit damage process modelling

    DEFF Research Database (Denmark)

    Custer, Rocco; Nishijima, Kazuyoshi

    2015-01-01

    The present paper introduces a vulnerability modelling approach for residential buildings in flood. The modelling approach explicitly considers relevant damage processes, i.e. water infiltration into the building, mechanical failure of components in the building envelope and damage from water...

  1. Laboratory use of industrial control systems

    International Nuclear Information System (INIS)

    Rijllart, A.; Avot, L.; Brahy, D.; Jegou, D.; Saban, R.

    1994-01-01

    Industrial control system manufacturers supply the building blocks for the control of industrial equipment or specific process control applications. Although the laboratory environment is different in many aspects (prototyping, evolution and frequent reconfiguration), the use of these building blocks remain attractive because of their general purpose nature, their cost and the large spectrum of available types. In this paper we present three projects which have been implemented using both industrial control system building blocks (PLCs, controllers, digital and analogue plug-in I/O cards) and commercial software packages (LabView and VisualBasic) for the man-machine interface, the data acquisition and archiving, and the process control. This approach has proved to be economical, easy and fast to implement. ((orig.))

  2. D and D alternatives risk assessment for Building 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Robers, S.K.; Golden, K.M.

    1995-09-01

    This report presents the results of the Level 3 Decontamination and Decommissioning (D and D) Alternatives Risk Assessment (DARA) performed on Building 3515 located at the Oak Ridge National Laboratory (ORNL). The goal of the risk evaluation process is to provide risk information necessary to assist decision making for Environmental Restoration (ER) Program D and D facilities. This risk information is developed in the baseline risk assessment (BRA) and in the DARA. The BRA provides risk information necessary for determining whether or not a facility represents an unacceptable risk and requires remediation. In addition, the BRA also provides an estimation of the risks associated with the no-action alternative for use in the DARA. The objective of this Level 3 DARA is to evaluate and document the potential risks to human health, human safety, and the environment associated with the proposed remedial action at Building 3515. A Level 3 assessment is the least rigorous type of DARA. The decision to conduct a Level 3 DARA was based on the fact that characterization data from the facility are limited, and currently only one remedial alternative (complete dismantlement) is being evaluated in addition to the no-action alternative. The results of the DARA along with cost and engineering information may be used by project managers in making decisions regarding the final disposition of Building 3515. This Level 3 assessment meets the requirements of the streamlined risk assessment necessary for an Engineering Evaluation/Cost Analysis (EE/CA)

  3. Vulnerability Assessment and Resiliency Planning: The National Renewable Energy Laboratory's Process and Best Practices; May 23, 2014 - June 5, 2015

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, J. [Abt Environmental Research, Boulder, CO (United States); Renfrow, S. [Abt Environmental Research, Boulder, CO (United States)

    2016-02-19

    The National Renewable Energy Laboratory (NREL) is a U.S. Department of Energy (DOE) research laboratory that employs more than 2,500 people. The laboratory focuses on renewable energy and energy-efficiency research and has two campuses along the Front Range of Colorado. In 2014, NREL worked with Abt Environmental Research (then called Stratus Consulting Inc.) to develop a vulnerability assessment and resiliency action plan as part of NREL's Climate Change Resiliency and Preparedness (CCRP) project. This guide describes the process that NREL undertook during this project. NREL used a participatory approach to vulnerability assessment and resiliency planning that emphasized organizational context, building internal capacity, and the application of climate science in a practical and actionable manner.

  4. Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004–2012

    Science.gov (United States)

    Hamel, Donald J.; Sankalé, Jean-Louis; Samuels, Jay Osi; Sarr, Abdoulaye D.; Chaplin, Beth; Ofuche, Eke; Meloni, Seema T.; Okonkwo, Prosper; Kanki, Phyllis J.

    2015-01-01

    Introduction From 2004–2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President’s Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Methods Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Results Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Conclusions Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform and encourage the development of other

  5. Processing equipment for grinding of building powders

    Science.gov (United States)

    Fediuk, R. S.; Ibragimov, R. A.; Lesovik, V. S.; Pak, A. A.; Krylov, V. V.; Poleschuk, M. M.; Stoyushko, N. Y.; Gladkova, N. A.

    2018-03-01

    In the article questions of mechanical grinding up to nanosize of building powder materials are considered. In the process of mechanoactivation of the composite binder, active molecules of cement minerals arise when molecular packets are destroyed in the areas of defects and loosening of the metastable phase during decompensation of intermolecular forces. The process is accompanied by a change in the kinetics of hardening Portland cement. Mechanical processes in the grinding of mineral materials cause, together with an increase in their surface energy, the growth of the isobaric potential of the powders and, accordingly, their chemical activity, which also contributes to high adhesion strength when they come into contact with binders. Thus, a set of measures for mechanical activation allows more fully use the mass of components of the filled cement systems and regulate their properties. At relatively low costs, it is possible to provide an impressive and, importantly, easily repeatable in production conditions result. It is revealed that the use of a vario-planetary mill allows to achieve the best results on grinding the powder building materials.

  6. Sandia, California Tritium Research Laboratory transition and reutilization project

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, T.B. [Sandia National Lab., Albuquerque, NM (United States)

    1997-02-01

    This paper describes a project within Sandia National Laboratory to convert the shut down Tritium Research Laboratory into a facility which could be reused within the laboratory complex. In the process of decommissioning and decontaminating the facility, the laboratory was able to save substantial financial resources by transferring much existing equipment to other DOE facilities, and then expeditiously implementing a decontamination program which has resulted in the building being converted into laboratory space for new lab programs. This project of facility reuse has been a significant financial benefit to the laboratory.

  7. High-Frequency Microwave Processing of Materials Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: Conducts research on high-frequency microwave processing of materials using a highpower, continuous-wave (CW), 83-GHz, quasi-optical beam system for rapid,...

  8. Indicators for Building Process without Final Defects -

    DEFF Research Database (Denmark)

    Jørgensen, Kirsten; Rasmussen, Grane Mikael Gregaard; Thuesen, Christian Langhoff

    2011-01-01

    This article introduces the preliminary data analysis, as well as the underlying theories and methods for identifying the indicators for building process without final defects. Since 2004, the Benchmark Centre for the Danish Construction Sector (BEC) has collected information about legal defects...

  9. 308 Building deactivation mission analysis report

    International Nuclear Information System (INIS)

    Lund, D.P.

    1995-01-01

    This report presents the results of the 308 Building (Fuels Development Laboratory) Deactivation Project mission analysis. Hanford systems engineering (SE) procedures call for a mission analysis. The mission analysis is an important first step in the SE process. The functions and requirements to successfully accomplish this mission, the selected alternatives and products will later be defined using the SE process

  10. Tall-building development process in downtown Maringá-PR, Brazil

    Directory of Open Access Journals (Sweden)

    José Roberto Machado

    2012-02-01

    Full Text Available This work describes the urbanization process taking place in the city of Maringá, in the context of the tallbuilding development at its main economic axis, the city center. This research aims to conduct an in-depth analysis of the role played by the housing industry in the development of tall buildings at downtown Maringá, the origin of the capital associated to such process, and the rationale for building them in Zone 1 (downtown. This is also analyzed considering local environmental information and infrastructural considerations involved in this process.

  11. Building laboratory capacity to support HIV care in Nigeria: Harvard/APIN PEPFAR, 2004–2012

    Directory of Open Access Journals (Sweden)

    Donald J. Hamel

    2015-05-01

    Full Text Available Introduction: From 2004–2012, the Harvard/AIDS Prevention Initiative in Nigeria, funded through the US President’s Emergency Plan for AIDS Relief programme, scaled up HIV care and treatment services in Nigeria. We describe the methodologies and collaborative processes developed to improve laboratory capacity significantly in a resource-limited setting. These methods were implemented at 35 clinic and laboratory locations. Methods: Systems were established and modified to optimise numerous laboratory processes. These included strategies for clinic selection and management, equipment and reagent procurement, supply chains, laboratory renovations, equipment maintenance, electronic data management, quality development programmes and trainings. Results: Over the eight-year programme, laboratories supported 160 000 patients receiving HIV care in Nigeria, delivering over 2.5 million test results, including regular viral load quantitation. External quality assurance systems were established for CD4+ cell count enumeration, blood chemistries and viral load monitoring. Laboratory equipment platforms were improved and standardised and use of point-of-care analysers was expanded. Laboratory training workshops supported laboratories toward increasing staff skills and improving overall quality. Participation in a World Health Organisation-led African laboratory quality improvement system resulted in significant gains in quality measures at five laboratories. Conclusions: Targeted implementation of laboratory development processes, during simultaneous scale-up of HIV treatment programmes in a resource-limited setting, can elicit meaningful gains in laboratory quality and capacity. Systems to improve the physical laboratory environment, develop laboratory staff, create improvements to reduce costs and increase quality are available for future health and laboratory strengthening programmes. We hope that the strategies employed may inform

  12. Postirradiation Testing Laboratory (327 Building)

    International Nuclear Information System (INIS)

    Kammenzind, D.E.

    1997-01-01

    A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site's or facility's mission or configuration, a change in the facility's life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct

  13. Postirradiation Testing Laboratory (327 Building)

    Energy Technology Data Exchange (ETDEWEB)

    Kammenzind, D.E.

    1997-05-28

    A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct

  14. Termination of the Special Metallurgical (SM) Building at Mound Laboratory: a final report

    International Nuclear Information System (INIS)

    Harris, W.R.; Kokenge, B.R.; Marsh, G.C.

    1976-01-01

    The report describes and highlights the more important factors associated with the termination of the Special Metallurgical (SM) Building at Mound Laboratory. As a result, a written record of the more important techniques and procedures is now available for reference by others involved in similar termination efforts. Included in this report is a description of the organizational units that were used in this effort along with a description of their responsibilities. A general description of the SM Building and a discussion of the more relevant procedures and equipment that were used are also presented. In addition, pertinent Health Physics information, such as personnel exposure, final wipe levels in the terminated facility, and assays of the structure, are provided. Based on the experience gained from this project, recommendations were made regarding the design of future radioactive material handling facilities so that when they are ultimately terminated the effort can be accomplished more efficiently

  15. Facilitating Improvements in Laboratory Report Writing Skills with Less Grading: A Laboratory Report Peer-Review Process

    Directory of Open Access Journals (Sweden)

    Jennifer R. Brigati

    2015-02-01

    Full Text Available Incorporating peer-review steps in the laboratory report writing process provides benefits to students, but it also can create additional work for laboratory instructors. The laboratory report writing process described here allows the instructor to grade only one lab report for every two to four students, while giving the students the benefits of peer review and prompt feedback on their laboratory reports. Here we present the application of this process to a sophomore level genetics course and a freshman level cellular biology course, including information regarding class time spent on student preparation activities, instructor preparation, prerequisite student knowledge, suggested learning outcomes, procedure, materials, student instructions, faculty instructions, assessment tools, and sample data. T-tests comparing individual and group grading of the introductory cell biology lab reports yielded average scores that were not significantly different from each other (p = 0.13, n = 23 for individual grading, n = 6 for group grading. T-tests also demonstrated that average laboratory report grades of students using the peer-review process were not significantly different from those of students working alone (p = 0.98, n = 9 for individual grading, n = 6 for pair grading. While the grading process described here does not lead to statistically significant gains (or reductions in student learning, it allows student learning to be maintained while decreasing instructor workload. This reduction in workload could allow the instructor time to pursue other high-impact practices that have been shown to increase student learning. Finally, we suggest possible modifications to the procedure for application in a variety of settings.

  16. Facilitating improvements in laboratory report writing skills with less grading: a laboratory report peer-review process.

    Science.gov (United States)

    Brigati, Jennifer R; Swann, Jerilyn M

    2015-05-01

    Incorporating peer-review steps in the laboratory report writing process provides benefits to students, but it also can create additional work for laboratory instructors. The laboratory report writing process described here allows the instructor to grade only one lab report for every two to four students, while giving the students the benefits of peer review and prompt feedback on their laboratory reports. Here we present the application of this process to a sophomore level genetics course and a freshman level cellular biology course, including information regarding class time spent on student preparation activities, instructor preparation, prerequisite student knowledge, suggested learning outcomes, procedure, materials, student instructions, faculty instructions, assessment tools, and sample data. T-tests comparing individual and group grading of the introductory cell biology lab reports yielded average scores that were not significantly different from each other (p = 0.13, n = 23 for individual grading, n = 6 for group grading). T-tests also demonstrated that average laboratory report grades of students using the peer-review process were not significantly different from those of students working alone (p = 0.98, n = 9 for individual grading, n = 6 for pair grading). While the grading process described here does not lead to statistically significant gains (or reductions) in student learning, it allows student learning to be maintained while decreasing instructor workload. This reduction in workload could allow the instructor time to pursue other high-impact practices that have been shown to increase student learning. Finally, we suggest possible modifications to the procedure for application in a variety of settings.

  17. Towards a Toolbox for a Process Innovation Laboratory

    DEFF Research Database (Denmark)

    Gong, Jie; Møller, Charles

    2011-01-01

    Driven by the global competition, process Innovation has been a challenge to large enterprises for many years. The research in this paper discusses about the theory and methods of Business Process Innovation (BPI) in designing Intelligent Supply Chains (ISC) in inter-organizations. We first review...... the BPI concepts, compare it with Business Process Improvement (BPIm) and Business Process Reengineering (BPR), and then build an analytical framework to define business process innovation from four different perspectives: management science, knowledge management, information technology and quality...

  18. Towards a Toolbox for a Process Innovation Laboratory

    DEFF Research Database (Denmark)

    Gong, Jie; Møller, Charles

    2012-01-01

    Driven by the global competition, process Innovation has been a challenge to large enterprises for many years. The research in this paper discusses about the theory and methods of Business Process Innovation (BPI) in designing Intelligent Supply Chains (ISC) in inter-organizations. We first review...... the BPI concepts, compare it with Business Process Improvement (BPIm) and Business Process Reengineering (BPR), and then build an analytical framework to define business process innovation from four different perspectives: management science, knowledge management, information technology and quality...

  19. Building enterprise systems with ODP an introduction to open distributed processing

    CERN Document Server

    Linington, Peter F; Tanaka, Akira; Vallecillo, Antonio

    2011-01-01

    The Reference Model of Open Distributed Processing (RM-ODP) is an international standard that provides a solid basis for describing and building widely distributed systems and applications in a systematic way. It stresses the need to build these systems with evolution in mind by identifying the concerns of major stakeholders and then expressing the design as a series of linked viewpoints. Although RM-ODP has been a standard for more than ten years, many practitioners are still unaware of it. Building Enterprise Systems with ODP: An Introduction to Open Distributed Processing offers a gentle pa

  20. Fabrication and laboratory-based performance testing of a building-integrated photovoltaic-thermal roofing panel

    International Nuclear Information System (INIS)

    Chen, Fangliang; Yin, Huiming

    2016-01-01

    Highlights: • A BIPVT solar panel is designed and fabricated for energy efficient buildings. • A high-speed manufacture method is developed to produce the functionally graded materials. • Laboratory tests demonstrate BIPVT’s energy efficiency improvement and innovations. • The PV efficiency is enhanced ∼24% through temperature control of the panel by water flow. • The combined electric and thermal efficiency reaches >75% of solar irradiation. - Abstract: A building integrated photovoltaic-thermal (BIPVT) multifunctional roofing panel has been developed in this study to harvest solar energy in the form of PV electricity as well as heat energy through the collection of warm water. As a key component of the multifunctional building envelope, an aluminum/high-density polyethylene (HDPE) functionally graded material (FGM) panel embedded with aluminum water tubes has been fabricated through the vibration-sedimentation approach. The FGM layer gradually transits material phases from well-conductive side (with aluminum dominated) to another highly insulated side (with HDPE). The heat in the PV cells can be easily transferred into the conductive side of the FGM and then collected by the water flow in the embedded tubes. Therefore, the operational temperature of the PV cells can be significantly lowered down, which recovers the PV efficiency in hot weather. In this way, the developed BIPVT panel is able to efficiently harvest solar energy in the form of both PV electricity and heat. The performance of a prototype BIPVT panel has been evaluated in terms of its thermal efficiency via warm water collection and PV efficiency via the output electricity. The laboratory test results demonstrate that significant energy conversion efficiency improvement can be achieved for both electricity generation and heat collection by the presented BIPVT roofing system. Overall, the performance indicates a very promising prospective of the new BIPVT multifunctional roofing panel.

  1. Building a Laboratory: the Work of Global University Rankers

    DEFF Research Database (Denmark)

    Lim, Miguel Antonio

    2015-01-01

    ’, and more relevant products. The metaphor allows us to understand the changeability of rankings and highlights that the process of making rankings can be influenced by the different audiences they are aimed at. University leaders are not passive players in the recognition of expertise in higher education...... evaluation. I present some of the ways in which these leaders are part of the process from the lesser known point-of-view of the ranking organisations. I propose three questions: 1) Can the university ranker be thought of as a ‘laboratory’? 2) How does the university ranking laboratory produce its ‘science...

  2. Sustainable flexible process innovation. Towards a new building design approach

    NARCIS (Netherlands)

    Brand, G.J.W. van den; Quanjel, E.; Zeiler, W.

    2001-01-01

    Developers and investors ofresidential and office buildings are facing large risks. A yearly loss ofcapital of approximately 50 billion EURO can be reduced by improvement of the design process. The need for more sustainable and end user oriented buildings on a background ofthe dynamics ofever

  3. Improving the Learning Process in the Latest Prefabricated School Buildings

    Science.gov (United States)

    Pons, Oriol; Oliva, Josep-Manuel; Maas, Sandra-Ruth

    2010-01-01

    Since 2000 hundreds of school centers have been constructed in Catalonia using industrialized technologies. These centers are modern, useful, educational edifices built using advantageous prefabricated technologies that improve the building process and reduce the environmental impact of the building. This article analyses whether these…

  4. Deactivation of Building 7602

    International Nuclear Information System (INIS)

    Yook, H.R.; Barnett, J.R.; Collins, T.L.

    1995-10-01

    The Department of Energy (DOE) has sponsored research and development programs in Building 7602 at Oak Ridge National Laboratory (ORNL) since 1984. This work focused on development of advanced technology for processing nuclear fuels. Building 7602 was used for engineering-scale tests using depleted and natural uranium to simulate the nuclear fuel. In April 1994 the DOE Office of Nuclear Energy (NE) sent supplemental FY 1994 guidance to ORNL stating that in FY 1995 and beyond, Building 7602 is considered surplus to NE programs and missions and shall be shut down (deactivated) and maintained in a radiologically and industrially safe condition with minimal surveillance and maintenance (S ampersand M). DOE-NE subsequently provided FY 1995 funding to support the deactivation activities. Deactivation of Building 7602 was initiated on October 1, 1994. The principal activity during the first quarter of FY 1995 was removal of process materials (chemicals and uranium) from the systems. The process systems were operated to achieve chemical solution concentrations needed for reuse or disposal of the solutions prior to removal of the materials from the systems. During this phase of deactivation the process materials processed and removed were: (1) Uranyl nitrate solution 30,178 L containing 4490 kg of uranium; (2) Nitric acid (neutralized) 9850 L containing less than 0.013 kg of uranium; (3) Organic solution 3346 L containing 265 kg of uranium; (4) Uranium oxide powder 95 kg; and (5) Miscellaneous chemicals. At the end of December 1994, the process systems and control systems were shut down and deactivated. Disposition of the process materials removed from the process systems in Building 7602 proved to be the most difficult part of the deactivation. An operational stand down and funding reductions at Y-12 prevented planned conversion of the uranyl nitrate solution to depleted uranium oxide powder. This led to disposal of the uranyl nitrate solution as waste

  5. Building the competitive intelligence knowledge: processes and activities in a corporate organisation

    OpenAIRE

    Sreenivasulu, V.

    1999-01-01

    This paper discusses the process of building and developing comprehensive tools, techniques, support systems, and better methods of harnessing the competitive intelligence knowledge processes. The author stresses the need for building sophisticated methodological competitive intelligence knowledge acquisition, systematic collection of competitive intelligence knowledge from various sources for critical analysis, process, organization, synthesis, assessment, screening, filtering and interpreta...

  6. CAPACITY BUILDING PROCESS IN ENVIRONMENTAL AND HEALTH IMPACT ASSESSMENT FOR A THAI COMMUNITY.

    Science.gov (United States)

    Chaithui, Suthat; Sithisarankul, Pornchai; Hengpraprom, Sarunya

    2017-03-01

    This research aimed at exploring the development of the capacitybuilding process in environmental and health impact assessment, including the consideration of subsequent, capacity-building achievements. Data were gathered through questionnaires, participatory observations, in-depth interviews, focus group discussions, and capacity building checklist forms. These data were analyzed using content analysis, descriptive statistics, and inferential statistics. Our study used the components of the final draft for capacity-building processes consisting of ten steps that were formulated by synthesis from each respective process. Additionally, the evaluation of capacity building levels was performed using 10-item evaluation criteria for nine communities. The results indicated that the communities performed well under these criteria. Finally, exploration of the factors influencing capacity building in environmental and health impact assessment indicated that the learning of community members by knowledge exchange via activities and study visits were the most influential factors of the capacity building processes in environmental and health impact assessment. The final revised version of capacitybuilding process in environmental and health impact assessment could serve as a basis for the consideration of interventions in similar areas, so that they increased capacity in environmental and health impact assessments.

  7. DECOMMISSIONING THE BROOKHAVEN NATIONAL LABORATORY BUILDING 830 GAMMA IRRADIATION FACILITY.

    Energy Technology Data Exchange (ETDEWEB)

    BOWERMAN, B.S.; SULLIVAN, P.T.

    2001-08-13

    The Building 830 Gamma Irradiation Facility (GIF) at Brookhaven National Laboratory (BNL) was decommissioned because its design was not in compliance with current hazardous tank standards and its cobalt-60 sources were approaching the end of their useful life. The facility contained 354 stainless steel encapsulated cobalt-60 sources in a pool, which provided shielding. Total cobalt-60 inventory amounted to 24,000 Curies when the sources were shipped for disposal. The decommissioning project included packaging, transport, and disposal of the sources and dismantling and disposing of all other equipment associated with the facility. Worker exposure was a major concern in planning for the packaging and disposal of the sources. These activities were planned carefully according to ALARA (As Low As Reasonably Achievable) principles. As a result, the actual occupational exposures experienced during the work were within the planned levels. Disposal of the pool water required addressing environmental concerns, since the planned method was to discharge the slightly contaminated water to the BNL sewage treatment plant. After the BNL evaluation procedure for discharge to the sewage treatment plant was revised and reviewed by regulators and BNL's Community Advisory Council, the pool water was discharged to the Building 830 sanitary system. Because the sources were sealed and the pool water contamination levels were low, most of the remaining equipment was not contaminated; therefore disposal was straightforward, as scrap metal and construction debris.

  8. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment

    Energy Technology Data Exchange (ETDEWEB)

    Ullrich, R. A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sullivan, M. A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2007-09-14

    This document was prepared to support u.s. Department of Energy / National Nuclear Security Agency (DOE/NNSA) compliance with Sections 106 and 110 of the National Historic Preservation Act (NHPA). Lawrence Livermore National Laboratory (LLNL) is a DOE/NNSA laboratory and is engaged in determining the historic status of its properties at both its main site in Livermore, California, and Site 300, its test site located eleven miles from the main site. LLNL contracted with the authors via Sandia National Laboratories (SNL) to prepare a historic context statement for properties at both sites and to provide assessments of those properties of potential historic interest. The report contains an extensive historic context statement and the assessments of individual properties and groups of properties determined, via criteria established in the context statement, to be of potential interest. The historic context statement addresses the four contexts within which LLNL falls: Local History, World War II History (WWII), Cold War History, and Post-Cold War History. Appropriate historic preservation themes relevant to LLNL's history are delineated within each context. In addition, thresholds are identified for historic significance within each of the contexts based on the explication and understanding of the Secretary of the Interior's Guidelines for determining eligibility for the National Register of Historic Places. The report identifies specific research areas and events in LLNL's history that are of interest and the portions of the built environment in which they occurred. Based on that discussion, properties of potential interest are identified and assessments of them are provided. Twenty individual buildings and three areas of potential historic interest were assessed. The final recommendation is that, of these, LLNL has five individual historic buildings, two sets of historic objects, and two historic districts eligible for the National Register. All are

  9. Manual on laboratory testing for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    Laboratory testing of uranium ores is an essential step in the economic evaluation of uranium occurrences and in the development of a project for the production of uranium concentrates. Although these tests represent only a small proportion of the total cost of a project, their proper planning, execution and interpretation are of crucial importance. The main purposes of this manual are to discuss the objectives of metallurgical laboratory ore testing, to show the specific role of these tests in the development of a project, and to provide practical instructions for performing the tests and for interpreting their results. Guidelines on the design of a metallurgical laboratory, on the equipment required to perform the tests and on laboratory safety are also given. This manual is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. A report on the Significance of Mineralogy in the Development of Flowsheets for Processing Uranium Ores (Technical Reports Series No. 196, 1980) and an instruction manual on Methods for the Estimation of Uranium Ore Reserves (No. 255, 1985) have already been published. 17 refs, 40 figs, 17 tabs

  10. Chemical surety material decontamination and decommissioning of Los Alamos National Laboratory Chemical Surety Material Laboratory area TA-3, building SM-29, room 4009

    International Nuclear Information System (INIS)

    Moore, T.E.; Smith, J.M.

    1994-04-01

    From 1982 through 1987, Los Alamos National Laboratory (LANL) performed surety laboratory operations for the U.S. Army Medical Research and Development Command (MRDC). Room 4009 in building SM-29, TA-3, was used as the laboratory for work with the following chemical surety material (CSM) agents: sarin (GB), soman (GD), lewisite (L), and distilled mustard (HD) radio-labelled with H 3 or C 14 . The work was confined to three CSM-certified fume hoods, located in room 4009 (see diagram in Appendix C). The laboratory ceased all active operations during the late 1986 and early 1987 period. From 1987 until 1993 the laboratory was secured and the ventilation system continued to operate. During late 1992, the decision was made to utilize this laboratory space for other operations, thus a decision was made to dismantle and reconfigure this room. LANL sub-contracted Battelle Memorial Institute (BMI) to draw upon the CSM experience of the technical staff from the Hazardous Materials Research Facility (HMRF) to assist in developing a decontamination and decommissioning plan. BMI was subcontracted to devise a CSM safety training course, and a sampling and air monitoring plan for CSM material to ensure personnel safety during all disassembly operations. LANL subcontracted Johnson Controls personnel to perform all disassembly operations. Beginning in early 1993 BMI personnel from the HMRF visited the laboratory to develop both the safety plan and the sample and air monitoring plan. Execution of that plan began in September 1993 and was completed in January 1994

  11. Chemical surety material decontamination and decommissioning of Los Alamos National Laboratory Chemical Surety Material Laboratory area TA-3, building SM-29, room 4009

    Energy Technology Data Exchange (ETDEWEB)

    Moore, T.E.; Smith, J.M.

    1994-04-01

    From 1982 through 1987, Los Alamos National Laboratory (LANL) performed surety laboratory operations for the U.S. Army Medical Research and Development Command (MRDC). Room 4009 in building SM-29, TA-3, was used as the laboratory for work with the following chemical surety material (CSM) agents: sarin (GB), soman (GD), lewisite (L), and distilled mustard (HD) radio-labelled with H{sup 3} or C{sup 14}. The work was confined to three CSM-certified fume hoods, located in room 4009 (see diagram in Appendix C). The laboratory ceased all active operations during the late 1986 and early 1987 period. From 1987 until 1993 the laboratory was secured and the ventilation system continued to operate. During late 1992, the decision was made to utilize this laboratory space for other operations, thus a decision was made to dismantle and reconfigure this room. LANL sub-contracted Battelle Memorial Institute (BMI) to draw upon the CSM experience of the technical staff from the Hazardous Materials Research Facility (HMRF) to assist in developing a decontamination and decommissioning plan. BMI was subcontracted to devise a CSM safety training course, and a sampling and air monitoring plan for CSM material to ensure personnel safety during all disassembly operations. LANL subcontracted Johnson Controls personnel to perform all disassembly operations. Beginning in early 1993 BMI personnel from the HMRF visited the laboratory to develop both the safety plan and the sample and air monitoring plan. Execution of that plan began in September 1993 and was completed in January 1994.

  12. Building Design Guidelines of Interior Architecture for Bio safety Levels of Biology Laboratories

    International Nuclear Information System (INIS)

    ElDib, A.A.

    2014-01-01

    This paper discusses the pivotal role of the Interior Architecture As one of the scientific disciplines minute to complete the Architectural Sciences, which relied upon the achievement and development of facilities containing scientific research laboratories, in terms of planning and design, particularly those containing biological laboratories using radioactive materials, adding to that, the application of the materials or raw materials commensurate with each discipline of laboratory and its work nature, and by the discussion the processing of design techniques and requirements of interior architecture dealing with Research Laboratory for electronic circuits an their applications with the making of its prototypes

  13. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Keesee, H.F.

    1976-09-01

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  14. Virtual and Remote Laboratories in Process of Control Education

    Directory of Open Access Journals (Sweden)

    Martin Kalúz

    2012-02-01

    Full Text Available This paper describes the progress in the development of virtual and remote laboratories at Department of Information Engineering and Process Control, FCFT STU in Bratislava. Article is the overview of technical solutions used for online education purposes. These comprise software technologies, most commonly used in virtual and remote laboratory design at our department, as MATLAB Web Server, Java, C/C++, and Adobe Flash. We have created virtual laboratories as online Web applications, which provide features of mathematical computing and simulations of technological plants. We also describe a technology of remote control laboratory with a real experimental device.

  15. Pharmaceutical process chemistry: evolution of a contemporary data-rich laboratory environment.

    Science.gov (United States)

    Caron, Stéphane; Thomson, Nicholas M

    2015-03-20

    Over the past 20 years, the industrial laboratory environment has gone through a major transformation in the industrial process chemistry setting. In order to discover and develop robust and efficient syntheses and processes for a pharmaceutical portfolio with growing synthetic complexity and increased regulatory expectations, the round-bottom flask and other conventional equipment familiar to a traditional organic chemistry laboratory are being replaced. The new process chemistry laboratory fosters multidisciplinary collaborations by providing a suite of tools capable of delivering deeper process understanding through mechanistic insights and detailed kinetics translating to greater predictability at scale. This transformation is essential to the field of organic synthesis in order to promote excellence in quality, safety, speed, and cost efficiency in synthesis.

  16. Integrated management of information inside maintenance processes. From the building registry to BIM systems

    Directory of Open Access Journals (Sweden)

    Cinzia Talamo

    2014-10-01

    Full Text Available The paper presents objec- tives, methods and results of two researches dealing with the improvement of integrated information management within maintenance processes. Focusing on information needs regarding the last phases of the building process, the two researches draft approaches characterizing a path of progressive improve- ment of strategies for integration: from a building registry, unique for the whole construction process, to an integrated management of the building process with the support of BIM systems.

  17. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  18. Analytical methods and laboratory facility for the Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Coleman, C.J.; Dewberry, R.A.; Lethco, A.J.; Denard, C.D.

    1985-01-01

    This paper describes the analytical methods, instruments, and laboratory that will support vitrification of defense waste. The Defense Waste Processing Facility (DWPF) is now being constructed at Savannah River Plant (SRP). Beginning in 1989, SRP high-level defense waste will be immobilized in borosilicate glass for disposal in a federal repository. The DWPF will contain an analytical laboratory for performing process control analyses. Additional analyses will be performed for process history and process diagnostics. The DWPF analytical facility will consist of a large shielded sampling cell, three shielded analytical cells, a laboratory for instrumental analysis and chemical separations, and a counting room. Special instrumentation is being designed for use in the analytical cells, including microwave drying/dissolution apparatus, and remote pipetting devices. The instrumentation laboratory will contain inductively coupled plasma, atomic absorption, Moessbauer spectrometers, a carbon analyzer, and ion chromatography equipment. Counting equipment will include intrinsic germanium detectors, scintillation counters, Phoswich alpha, beta, gamma detectors, and a low-energy photon detector

  19. Rapid radiochemical procedures for a process support laboratory

    International Nuclear Information System (INIS)

    Beals, D.M.

    1998-01-01

    An on-site mobile laboratory has been installed near a groundwater treatment facility, and rapid analytical procedures have been deployed for determining sample activity in the process support laboratory. The required analyses to support the remediation project include gross alpha/, gross nonvolatile beta, 90 Sr, 99 Tc, 137 Cs and total Ra (226 + 228). The present mission of the Savannah River Site (SRS), a US Department of Energy nuclear production facility, is one of nuclear waste stabilization and of environmental restoration and remediation. Because of previous practices of disposing low-level radioactive waste to seepage basins, some of the groundwater under the SRS has become contaminated with radioactive species. A water treatment facility has been installed to remediate the groundwater below the old F and H areas' seepage basins. Groundwater is pumped from the contaminated aquifer through a series of filtration, ion exchange, and reverse osmosis steps and when cleaned is reinjected back into the aquifer. Samples are pulled from various points in the treatment facility to ensure that the process is working as designed. In order to minimize turnaround time for these analyses, a process control station (i.e., a mobile on-site laboratory) has been installed at the F area water treatment unit, and rapid radioanalytical procedures have been deployed

  20. 1995 building energy codes and standards workshops: Summary and documentation

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, L.J.; Shankle, D.L.

    1996-02-01

    During the spring of 1995, Pacific Northwest National Laboratory (PNNL) conducted four two-day Regional Building Energy Codes and Standards workshops across the US. Workshops were held in Chicago, Denver, Rhode Island, and Atlanta. The workshops were designed to benefit state-level officials including staff of building code commissions, energy offices, public utility commissions, and others involved with adopting/updating, implementing, and enforcing building energy codes in their states. The workshops provided an opportunity for state and other officials to learn more about residential and commercial building energy codes and standards, the role of the US Department of Energy and the Building Standards and Guidelines Program at Pacific Northwest National Laboratory, Home Energy Rating Systems (HERS), Energy Efficient Mortgages (EEM), training issues, and other topics related to the development, adoption, implementation, and enforcement of building energy codes. Participants heard success stories, got tips on enforcement training, and received technical support materials. In addition to receiving information on the above topics, workshop participants had an opportunity to provide input on code adoption issues, building industry training issues, building design issues, and exemplary programs across the US. This paper documents the workshop planning, findings, and follow-up processes.

  1. PHYSICAL AND MECHANICAL CHARACTERISTICS OF BUILDING MATERIALS OF HISTORIC BUILDINGS

    Directory of Open Access Journals (Sweden)

    Jiří Witzany

    2017-12-01

    Full Text Available The article presents partial results of laboratory research into physical and mechanical characteristics of materials most commonly used as walling units in masonry structures of historic and heritage buildings. Core boreholes and specimens for the laboratory research of selected characteristics were sampled from accessible places of historic buildings, which had not been restored or reconstructed. The results of the research brought new knowledge about the unreliability (variance of the properties of historical, mainly natural building materials, and, at the same time, pointed out the need for further research and extension of knowledge necessary for the assessment of residual physical and mechanical characteristics of historic masonry structures.

  2. Site characterization report for Building 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-08-01

    Building 3515 at Oak Ridge National Laboratory (ORNL), also known as the Fission Product Pilot Plant, is a surplus facility in the main plant area to the east of the South Tank Farm slated for decontamination and decommissioning (D ampersand D). The building consists of two concrete cells (north and south) on a concrete pad and was used to extract radioisotopes of ruthenium, strontium, cesium, cerium, rhenium and other elements from aqueous fission product waste. Site characterization activities of the building were initiated. The objective of the site characterization was to provide information necessary for engineering evaluation and planning of D ampersand D approaches, planning for personal protection of D ampersand D workers, and estimating waste volumes from D ampersand D activities. This site characterization report documents the investigation with a site description, a summary of characterization methods, chemical and radiological sample analysis results, field measurement results, and waste volume estimates

  3. Signal and Image Processing Research at the Lawrence Livermore National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R S; Poyneer, L A; Kegelmeyer, L M; Carrano, C J; Chambers, D H; Candy, J V

    2009-06-29

    Lawrence Livermore National Laboratory is a large, multidisciplinary institution that conducts fundamental and applied research in the physical sciences. Research programs at the Laboratory run the gamut from theoretical investigations, to modeling and simulation, to validation through experiment. Over the years, the Laboratory has developed a substantial research component in the areas of signal and image processing to support these activities. This paper surveys some of the current research in signal and image processing at the Laboratory. Of necessity, the paper does not delve deeply into any one research area, but an extensive citation list is provided for further study of the topics presented.

  4. Building and Benefiting from Member State Laboratory Capacities

    International Nuclear Information System (INIS)

    2014-01-01

    The Department of Nuclear Sciences and Applications implement a number of activities that are designed to enhance and capitalize upon the capacities of Member States’ laboratories worldwide. The Nuclear Sciences and Applications (NA) laboratories strengthen Member States’ analytical capacities through activities such as proficiency tests and inter-laboratory comparisons, and share the capacities of Member States’ laboratories with other Member States through the coordination of relevant networks and participation in the IAEA Collaborating Centre scheme. An example of these activities is the collaborative work carried out by the Terrestrial Environment Laboratory (TEL). The TEL cooperates with the IAEA Environment Laboratories in Monaco to distribute 92 types of reference materials for characterizing radionuclides, stable isotopes, trace elements or organic contaminants. These materials serve as international standards for establishing and evaluating the reliability and accuracy of analytical measurements. This collaborative work between NA laboratories, Member States and laboratories around the globe contribute to the IAEA’s mandate of fostering scientific and technical exchanges for the peaceful use of nuclear science and technology throughout the world

  5. The Turnover Process at Chalk River Laboratories from Operations to Decommissioning

    International Nuclear Information System (INIS)

    Pottelberg, Paul; Tremblay, Roger

    2016-01-01

    Canadian Nuclear Laboratories (CNL) has 200 facilities that account for approximately 2 million square feet of building space. Currently there are 23 facilities undergoing various stages of Decommissioning. An additional 30 facilities are scheduled to be turned over to Decommissioning in 2016. CNL is currently restructuring to transition to a Government Owned/Contractor Operated (GoCo) organization and there will be a focus to accelerate the Decommissioning of legacy facilities on site. In the past, facilities were shutdown and left in various configurations with limited documentation or limited staff knowledge of the status of the facility at the start of Decommissioning. Recently, guidelines have been developed to ensure that any facility being turned over is put into a proper and documented safe shutdown configuration. This paper will look at CNL's process for turnover of facilities from Operations to Decommissioning and identify some of the key Lessons Learned. The turnover of nuclear facilities, administrative and support buildings, components or areas from Operations to Decommissioning needs to be documented and managed to ensure Health, Safety, Security and Environmental (HSSE) risks are identified, eliminated or effectively controlled. At CNL, the turnover document Table of Contents is: Introduction and Purpose; Facility Boundaries; Known Deficiencies; Facility Status; Shutdown Status; Hazards; System/Equipment; Drawings/Maps/Records; Significant Environmental Aspects (SEAs); Interface; and other Transfer Documentation. The transfer documentation specifically covers: - Defined boundaries of the facility, building, component or area at the time of turnover; - Identification of all deficiencies associated with the facility, building, component or area and the person, after turnover, who will be responsible for correcting them; - Confirmation of the status of the facility, building, component or area at the time of turnover with respect to: - The status

  6. Mechanical characterization of natural building stones: observation of the fracture process zone by ESPI

    Science.gov (United States)

    Calvetti, Francesco; Cardani, Giuliana; Meda, Alberto

    1999-09-01

    The cultural heritage of many nations consist of a great variety of structures of high intrinsic value, which are often composed of natural building stones (NBS), as granite, limestone, marble and sandstone. The use of accurate inspection devices, such as laser interferometry, allows us to acquire information regarding the mechanical properties and damage (tensile cracks) of NBS, which represents the first step in the restoration process. In this paper, the potential application of an electronic speckle pattern interferometry (ESPI) is shown, with particular attention to the observed displacement field and the crack penetration during laboratory testing. In ESPI, by superimposing a reflected light to a reference digitized image, an interference phenomenon is produced. By comparing two recorded interference patterns (before and after loading), the corresponding deformation can be evaluated. The application of ESPI in several laboratory tests on NBS is presented in this paper. In particular, during bending tests performed on geometrically similar NBS specimens, it was observed that the size and shape of the localized damage zone do not depend on the specimen size. These results allow for an interpretation of the 'size- effect,' which consists of a reduction of nominal strength as the specimen size increases.

  7. Report of the Committee of inquiry into a fire which occurred on 18 March 1987 in a radioisotope processing cell, Building 54 at the Lucas Heights Research Laboratories

    International Nuclear Information System (INIS)

    1987-01-01

    At about 1745 hours on Wednesday, 18 March 1987 a fire occurred in a small charcoal filter inside a processing cell (hot cell) in Building 54 at the Lucas Heights Research Laboratories (LHRL). This cell was being used to process irradiated uranium to separate the radioactive isotope molybdenum-99. Some radioactive contamination escaped from the hot cell into the operating area and three AAEC officers were found to have minor radioactive contamination on their skin/hair. The majority of the radioactive material released from the fire was trapped by the main filters outside the cell. The total amounts of radioactive noble gas and of radioiodine released to the environment during the week in which the fire occurred were within the normal range of discharge and were 53% and 2.1%, respectively, of the weekly limit authorised by the NSW Department of Health. On the evidence available to it, the Committee concludes that the fire was caused by spontaneous combustion in the charcoal filter used to trap radioactive gases released by the operations in the hot cell; the mechanism causing the fire cannot be clearly established at this stage; no member of AAEC staff, NSW emergency services personnel or the general public suffered, or will suffer, any adverse health effects from radioactivity as a result of the accident

  8. Decontamination and decommissioning of the SPERT-I Reactor Building at the Idaho National Engineering Laboratory. Final report

    International Nuclear Information System (INIS)

    Dolenc, M.R.

    1986-02-01

    This final report documents the decontamination and decommissioning of the SPERT-I Reactor Building. This 20- by 40-ft galvanized steel building was dismantled; and the resultant contaminated sludge, liquid, and carbon steel were disposed of at the Radioactive Waste Management Complex of the Idaho National Engineering Laboratory. This report presents the results of the characterization, decision analysis, planning, and decommissioning of the facility. The total cost of these activities was $139,500. Of this total, $103,500 was required for decommissioning operations. (This latter figure represents a 20% savings over the estimated costs generated during the planning effort.) The objectives of decommissioning this facility were to stabilize the seepage pit area and remove the reactor building. The D and D work was divided into two parts; the seepage pit was decommissioned in 1984, and the reactor building in 1985. The entire area was backfilled with radiologically clean soil, graded, and seeded. Two markers were installed to identify the locations of the pit and reactor building. The only isotopes found in either decommissioning operation were cesium-137 and uranium-235 in very low concentrations. Decommissioning operations of the reactor building were carried out during August 1985. The project generate 297 ft 3 of radioactive waste. No personnel radiation exposure above background was received by D and D workers

  9. Building Process Organisation Model fit for Innovative Housing Concepts? Case Study of the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Kondratenko, I.; Jablonska, B. [ECN , Petten (Netherlands)

    2009-11-15

    There is growing justification and political commitment in Europe to tackle energy efficiency in new and existing buildings, both residential and non-residential. It requires shifting the construction sector towards large scale successful implementation of innovative energy efficient and sustainable building concepts. Nowadays, a number of innovative building concepts exist, to name a few: Very Low Energy, Passive House, Zero-Energy, Zero-Emission, Energy Producing, etc. However, the experience in the Netherlands has shown inflexibility in the behaviour within the traditional building process to allow the necessary changes for large scale introduction of innovative integral building concepts. This has led to examining the question: 'How well does the building process organisation model in the Netherlands allow the implementation of innovative housing building concepts?' Answering this question requires specific knowledge of the behaviour of the traditional building process, its characteristics, advantages and disadvantages, phases and actors involved. It also demanded to focus on the nature of barriers within, and on possibilities to overcome identified bottlenecks. Also, examined was the suitability of several selected novel concepts in their opportunities for adapting the building process organisation model and the behaviour of actors within, such as: The Life Cycle Analysis, (including the Whole Building Life Cycle Costing and the Least Life Cycle Costing), The Cradle to Cradle (C2C) Concept, The Living Building Concept and Private Initiatives. This also included recent experiences with building projects implementing these concepts in the Netherlands. In summary, there are a number of challenges. The traditional building process in the Netherlands is fragmented in nature into successive phases with a strict way of cooperation and division of tasks and responsibilities between actors. There is also a cost / risk approach preventing enabling long

  10. Removal site evaluation report on Building 7602 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for Building 7602 at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions, removal actions, or remedial evaluation. The results of the removal site evaluation indicate that areas associated with Building 7602 pose no imminent hazards requiring maintenance actions. Adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. Current actions that are being taken to prevent further release of contamination and ensure worker safety within Building 7602 are considered adequate until decontamination and decommissioning activities begin. Given the current status and condition of Building 7602, this removal site evaluation is considered complete and terminated

  11. BUILDING 341 Seismic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Halle, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-15

    The Seismic Evaluation of Building 341 located at Lawrence Livermore National Laboratory in Livermore, California has been completed. The subject building consists of a main building, Increment 1, and two smaller additions; Increments 2 and 3.

  12. Key decisions in a generic process for disposition of buildings that have actual or potential radiological contamination

    International Nuclear Information System (INIS)

    Spesard, A.; Donavan, K.; Bowden, B.; Crane, L.; Jensen, G.; Fox, K.L.; Goodwin, R.; Vandegrift, R.

    1997-01-01

    The Cleanup Standards Committee, formed within the Ohio Federal Facilities Forum, focuses on addressing issues related to cleanup levels and standards. To facilitate decision-making for the disposition of buildings that have potential or actual radiological contamination, the Cleanup Standards Committee developed a process to support building disposition decisions. This process is needed for two reasons: (1) due to changing missions, an increasing number of buildings on federal properties require disposition, and (2) current federal initiatives encourage the transfer of buildings and land for reuse and economic redevelopment. Since the committee developed this process using a teaming effort, the process reflects the experience, expertise, and opinions of committee members and other individuals with a broad range of experience and knowledge. The Generic Process for the Disposition of Buildings that have Potential or Actual Radiological Contamination is intended for use by Federal Facilities responsible for the cleanup of buildings at sites that have radiological process history. This process provides (1) a framework and supporting implementation guidelines for evaluating buildings that have actual or potential radiological contamination, and (2) a process for making building disposition decisions. This paper outlines on the key decision points and the associated data requirements of the process. Specifically, this paper focuses on the following decisions: Which decision-makers are appropriate to involve in the building disposition process; What is the preferred disposition of a building; What criteria are applicable for unconditional release; Is there sufficient existing information to proceed with disposition of a building; What level of survey is appropriate to determine and/or implement a preferred disposition of a building; and how are uncertainties addressed when implementing a building disposition

  13. Data processing software for purex plant process control laboratory

    International Nuclear Information System (INIS)

    Kansara, V.P.; Achuthan, P.V.; Sridhar, S.; Ramanujam, A.; Dhumwad, R.K.

    1990-01-01

    A software has been developed at the Fuel Reprocessing Division, Trombay to meet the data processing needs of the Control Laboratory of a reprocessing plant. During the normal plant operations contents of over one hundred process tanks have to be sampled and analysed for regular monitoring. In order to speed up the computation and the reporting of results as well as to obtain the process performance data over a period of time a software has been developed. The package has been sucessfully demonstrated and implemented at the Plutonium Plant, Trombay. This has been in continuous use since May 1987 with highly satisfactory performance. The software is a totally menu-driven package which can be used by the laboratory analysts with a few hours of training. The features include data validation involving source tank identification, the nature of the sample, the range of expected results, any duplication in sample numbering etc. Audio indication of deviations from the expected input or output values are given with an option to override in case of abnormal samples. The progress of analysis can be obtained for a given sample at any given time. Incorporated in the software is the help menu for quick reference of analytical protocol to be followed for a given tank/method. The computations for the determinations are carried out after obtaining input values on a screen-form. Th e results can be displayed on the monitor or obtained in the form of a hard copy i n any desired format. (author). 17 figs., 2 refs

  14. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D&D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate.

  15. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D ampersand D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate

  16. Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

  17. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  18. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  19. Restrictions of process machine retooling at machine-building enterprises

    Directory of Open Access Journals (Sweden)

    Kuznetsova Elena

    2017-01-01

    Full Text Available The competitiveness of the national economy depends on the technological level of the machine-building enterprises production equipment. Today in Russia there are objective and subjective restrictions for the optimum policy formation of the manufacturing equipment renewal. The analysis of the manufacturing equipment age structure dynamics in the Russian machine-building complex indicates the negative tendencies intensification: increase in the equipment service life, reduction in the share of up-to-date equipment, and drop in its use efficiency. The article investigates and classifies the main restrictions of the manufacturing equipment renewal process, such as regulatory and legislative, financial, organizational, competency-based. The economic consequences of the revealed restrictions influence on the machine-building enterprises activity are shown.

  20. NASA Net Zero Energy Buildings Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Pless, S.; Scheib, J.; Torcellini, P.; Hendron, B.; Slovensky, M.

    2014-10-01

    In preparation for the time-phased net zero energy requirement for new federal buildings starting in 2020, set forth in Executive Order 13514, NASA requested that the National Renewable Energy Laboratory (NREL) to develop a roadmap for NASA's compliance. NASA detailed a Statement of Work that requested information on strategic, organizational, and tactical aspects of net zero energy buildings. In response, this document presents a high-level approach to net zero energy planning, design, construction, and operations, based on NREL's first-hand experience procuring net zero energy construction, and based on NREL and other industry research on net zero energy feasibility. The strategic approach to net zero energy starts with an interpretation of the executive order language relating to net zero energy. Specifically, this roadmap defines a net zero energy acquisition process as one that sets an aggressive energy use intensity goal for the building in project planning, meets the reduced demand goal through energy efficiency strategies and technologies, then adds renewable energy in a prioritized manner, using building-associated, emission- free sources first, to offset the annual energy use required at the building; the net zero energy process extends through the life of the building, requiring a balance of energy use and production in each calendar year.

  1. Effects of process parameters on solid self-microemulsifying particles in a laboratory scale fluid bed.

    Science.gov (United States)

    Mukherjee, Tusharmouli; Plakogiannis, Fotios M

    2012-01-01

    The purpose of this study was to select the critical process parameters of the fluid bed processes impacting the quality attribute of a solid self-microemulsifying (SME) system of albendazole (ABZ). A fractional factorial design (2(4-1)) with four parameters (spray rate, inlet air temperature, inlet air flow, and atomization air pressure) was created by MINITAB software. Batches were manufactured in a laboratory top-spray fluid bed at 625-g scale. Loss on drying (LOD) samples were taken throughout each batch to build the entire moisture profiles. All dried granulation were sieved using mesh 20 and analyzed for particle size distribution (PSD), morphology, density, and flow. It was found that as spray rate increased, sauter-mean diameter (D(s)) also increased. The effect of inlet air temperature on the peak moisture which is directly related to the mean particle size was found to be significant. There were two-way interactions between studied process parameters. The main effects of inlet air flow rate and atomization air pressure could not be found as the data were inconclusive. The partial least square (PLS) regression model was found significant (P SME manufacturing process.

  2. [How do hospital clinical laboratories and laboratory testing companies cooperate and build reciprocal relations?].

    Science.gov (United States)

    Kawano, Seiji

    2014-12-01

    As the 2nd Joint Symposium of the Japanese Society of Laboratory Medicine and the Japanese Association of Laboratory Pathologists, the symposium on clinical test out-sourcing and branch laboratories was held at the 60th General Meeting of the Japanese Society of Laboratory Medicine on November 2nd, 2013 in Kobe. For the symposium, we conducted a questionnaire survey on the usage of clinical test out-sourcing and the introduction of branch laboratories to clinical laboratories of Japanese university hospitals, both private and public, between July 25th and August 20th, 2013. Seventy-two hospitals responded to the questionnaire survey, consisting of 41 public medical school hospitals and 31 private ones. According to the survey, the selection of each clinical test for out-sourcing was mainly determined by the capacities of hospital clinical laboratories and their equipment, as well as the profitability of each test. The main concerns of clinical laboratory members of university hospitals involved the continuity of measurement principles, traceability, and standardization of reference values for each test. They strongly requested the interchangeability and computerization of test data between laboratory testing companies. A branch laboratory was introduced to six hospitals, all of which were private medical college hospitals, out of 72 university hospitals, and eight of the other hospitals were open to its introduction. The merits and demerits of introducing a branch laboratory were also discussed. (Review).

  3. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  4. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  5. Pharmacia Building Q, Skokie, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    2002-12-01

    This case study was prepared as one in a series for the Laboratories for the 21st Century program, a joint endeavor of the U.S. Environmental Protection Agency and the U.S. Department of Energy's Federal Energy Management Program. The goal of this program is to foster greater energy efficiency in new and retrofit laboratory buildings in both the public and the private sectors. The energy-efficient elements of the laboratory featured in this case study-Pharmacia Corporation's new Building Q in Skokie, Illinois-include sustainable design, light-filled interior spaces for daylighting, energy-efficient fume hoods and other equipment, occupancy sensors to reduce lighting loads, and spectrally selective glazing to allow more light and less heat into the building. Water-saving fixtures are used, as well. Building Q has been certified Gold (the second highest rating) through the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) system.

  6. [Quality Management and Quality Specifications of Laboratory Tests in Clinical Studies--Challenges in Pre-Analytical Processes in Clinical Laboratories].

    Science.gov (United States)

    Ishibashi, Midori

    2015-01-01

    The cost, speed, and quality are the three important factors recently indicated by the Ministry of Health, Labour and Welfare (MHLW) for the purpose of accelerating clinical studies. Based on this background, the importance of laboratory tests is increasing, especially in the evaluation of clinical study participants' entry and safety, and drug efficacy. To assure the quality of laboratory tests, providing high-quality laboratory tests is mandatory. For providing adequate quality assurance in laboratory tests, quality control in the three fields of pre-analytical, analytical, and post-analytical processes is extremely important. There are, however, no detailed written requirements concerning specimen collection, handling, preparation, storage, and shipping. Most laboratory tests for clinical studies are performed onsite in a local laboratory; however, a part of laboratory tests is done in offsite central laboratories after specimen shipping. As factors affecting laboratory tests, individual and inter-individual variations are well-known. Besides these factors, standardizing the factors of specimen collection, handling, preparation, storage, and shipping, may improve and maintain the high quality of clinical studies in general. Furthermore, the analytical method, units, and reference interval are also important factors. It is concluded that, to overcome the problems derived from pre-analytical processes, it is necessary to standardize specimen handling in a broad sense.

  7. Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

    International Nuclear Information System (INIS)

    Wilcox, Brian; May, Doug; Howlett, Don; Bilinsky, Dennis

    2013-01-01

    Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m 2 . In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition

  8. Analysis of Design-Build Processes, Best Practices, and Applications to the Department of Defense

    Science.gov (United States)

    2006-06-01

    NAVFAC design-build processes published in trade journals, books , magazines, internet articles, and DoD policy. In their book , Contract Management...literature review concentrates on recent articles published in books , trade magazines, and on the internet to determine design-build processes and...Keith Molenaar ) Design-build projects under the State of California’s Public Contract Code (Legaltips.org, 2006) requires the owner, for example the

  9. Computer Prediction of Air Quality in Livestock Buildings

    DEFF Research Database (Denmark)

    Svidt, Kjeld; Bjerg, Bjarne

    In modem livestock buildings the design of ventilation systems is important in order to obtain good air quality. The use of Computational Fluid Dynamics for predicting the air distribution makes it possible to include the effect of room geometry and heat sources in the design process. This paper...... presents numerical prediction of air flow in a livestock building compared with laboratory measurements. An example of the calculation of contaminant distribution is given, and the future possibilities of the method are discussed....

  10. Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 base pairs per year, while still retaining its efficiency.

  11. Assessing and Reducing Plug and Process Loads in Retail Buildings (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2011-06-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in retail spaces are poorly understood.

  12. Assessing and Reducing Plug and Process Loads in Office Buildings (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2011-06-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

  13. Hard Hats, Octopuses and Rubber Boots- Operational Managers in Building Processes

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    This paper discusses Operation management (OM) in the production of buildings. It is initially contended that OM needs to be improved, from a theoretical and practical perspective. Departing from a criticism of present modeling and management of processes it is suggested to develop an understanding...... of the steps and interdependencies in the process. The field study shows a vast amount of interruptions in operational managers work at the building site. The site managers studied typically worked with four main activities and were interrupted some 126 times during a workday. The prime reason...

  14. Innovative model of business process reengineering at machine building enterprises

    Science.gov (United States)

    Nekrasov, R. Yu; Tempel, Yu A.; Tempel, O. A.

    2017-10-01

    The paper provides consideration of business process reengineering viewed as amanagerial innovation accepted by present day machine building enterprises, as well as waysto improve its procedure. A developed innovative model of reengineering measures isdescribed and is based on the process approach and other principles of company management.

  15. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  16. Conceptual Design for the Pilot-Scale Plutonium Oxide Processing Unit in the Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Lumetta, Gregg J.; Meier, David E.; Tingey, Joel M.; Casella, Amanda J.; Delegard, Calvin H.; Edwards, Matthew K.; Jones, Susan A.; Rapko, Brian M.

    2014-08-05

    This report describes a conceptual design for a pilot-scale capability to produce plutonium oxide for use as exercise and reference materials, and for use in identifying and validating nuclear forensics signatures associated with plutonium production. This capability is referred to as the Pilot-scale Plutonium oxide Processing Unit (P3U), and it will be located in the Radiochemical Processing Laboratory at the Pacific Northwest National Laboratory. The key unit operations are described, including plutonium dioxide (PuO2) dissolution, purification of the Pu by ion exchange, precipitation, and conversion to oxide by calcination.

  17. An analysis of buildings-related energy use in manufacturing

    Energy Technology Data Exchange (ETDEWEB)

    Niefer, M.J.; Ashton, W.B.

    1997-04-01

    This report presents research by the Pacific Northwest National Laboratory (PNNL) to develop improved estimates of buildings-related energy use in US manufacturing facilities. The research was supported by the Office of Building Technology, State and Community Programs (BTS), Office of Energy Efficiency and Renewable Energy (EERE), US Department of Energy (DOE). The research scope includes only space conditioning and lighting end uses. In addition, this study also estimates the energy savings potential for application of selected commercial buildings technologies being developed by the BTS office to manufacturing and other industrial process facilities. 17 refs., 2 figs., 19 tabs.

  18. Development and Implementation of a Quality Improvement Process for Echocardiographic Laboratory Accreditation.

    Science.gov (United States)

    Gilliland, Yvonne E; Lavie, Carl J; Ahmad, Homaa; Bernal, Jose A; Cash, Michael E; Dinshaw, Homeyar; Milani, Richard V; Shah, Sangeeta; Bienvenu, Lisa; White, Christopher J

    2016-03-01

    We describe our process for quality improvement (QI) for a 3-year accreditation cycle in echocardiography by the Intersocietal Accreditation Commission (IAC) for a large group practice. Echocardiographic laboratory accreditation by the IAC was introduced in 1996, which is not required but could impact reimbursement. To ensure high-quality patient care and community recognition as a facility committed to providing high-quality echocardiographic services, we applied for IAC accreditation in 2010. Currently, there is little published data regarding the IAC process to meet echocardiography standards. We describe our approach for developing a multicampus QI process for echocardiographic laboratory accreditation during the 3-year cycle of accreditation by the IAC. We developed a quarterly review assessing (1) the variability of the interpretations, (2) the quality of the examinations, (3) a correlation of echocardiographic studies with other imaging modalities, (4) the timely completion of reports, (5) procedure volume, (6) maintenance of Continuing Medical Education credits by faculty, and (7) meeting Appropriate Use Criteria. We developed and implemented a multicampus process for QI during the 3-year accreditation cycle by the IAC for Echocardiography. We documented both the process and the achievement of those metrics by the Echocardiography Laboratories at the Ochsner Medical Institutions. We found the QI process using IAC standards to be a continuous educational experience for our Echocardiography Laboratory physicians and staff. We offer our process as an example and guide for other echocardiography laboratories who wish to apply for such accreditation or reaccreditation. © 2016, Wiley Periodicals, Inc.

  19. User Participation in the Building Process

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld; Sørensen, Kristian Birch

    2011-01-01

    building systems (FBS), which are realized as component building systems (CBS), which will form parts in the total building solution. The formulated needs provide input to specific requirements in order to assure expected performance of the building components. The final virtual building model or part...... of it is evaluated by the end-users in the (4) 'Solution space'. Three on-going construction projects were used as cases in the development and in the testing of VICMET. Collaborative Virtual Reality environments were tested in order to present and discuss the suggested solutions with users. The virtual environments...

  20. Reimagining Building Sensing and Control (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Polese, L.

    2014-06-01

    Buildings are responsible for 40% of US energy consumption, and sensing and control technologies are an important element in creating a truly sustainable built environment. Motion-based occupancy sensors are often part of these control systems, but are usually altered or disabled in response to occupants' complaints, at the expense of energy savings. Can we leverage commodity hardware developed for other sectors and embedded software to produce more capable sensors for robust building controls? The National Renewable Energy Laboratory's (NREL) 'Image Processing Occupancy Sensor (IPOS)' is one example of leveraging embedded systems to create smarter, more reliable, multi-function sensors that open the door to new control strategies for building heating, cooling, ventilation, and lighting control. In this keynote, we will discuss how cost-effective embedded systems are changing the state-of-the-art of building sensing and control.

  1. Integrating Green Building Criteria Into Housing Design Processes Case Study: Tropical Apartment At Kebon Melati, Jakarta

    Science.gov (United States)

    Farid, V. L.; Wonorahardjo, S.

    2018-05-01

    The implementation of Green Building criteria is relatively new in architectural practice, especially in Indonesia. Consequently, the integration of these criteria into design process has the potential to change the design process itself. The implementation of the green building criteria into the conventional design process will be discussed in this paper. The concept of this project is to design a residential unit with a natural air-conditioning system. To achieve this purpose, the Green Building criteria has been implemented since the beginning of the design process until the detailing process on the end of the project. Several studies was performed throughout the design process, such as: (1) Conceptual review, where several professionally proved theories related to Tropical Architecture and passive design are used for a reference, and (2) Computer simulations, such as Computational Fluid Dynamics (CFD) and wind tunnel simulation, used to represent the dynamic response of the surrounding environment towards the building. Hopefully this paper may become a reference for designing a green residential building.

  2. Level III baseline risk evaluation for Building 3505 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mostella, W.B. Jr.

    1994-12-01

    The Level III Baseline Risk Evaluation (BRE) for Building 3505, the ORNL Metal Recovery Facility, provides an analysis of the potential for adverse health effects, current or future, associated with the presence of hazardous substances in the building. The Metal Recovery Facility was used from 1952 through 1960 to process large quantities of radioactive material using the PUREX process for the recovery of uranium-238, plutonium-239, neptunium-237, and americium-241. The facility consists of seven process cells (A through G), a canal, a dissolver room, a dissolver pit, an office, locker room, storage area, control room, electrical gallery, shop, and makeup area. The cells were used to house the nuclear fuel reprocessing equipment, and the canal was constructed to be used as a water-shielded transfer canal. Currently, there are no known releases of radioactive contaminants from Building 3505. To perform the BRE, historical radiological survey data were used to estimate the concentration of alpha- and beta/gamma emitting radionuclides in the various cells, rooms, and other areas in Building 3505. Data from smear surveys were used to estimate the amount of transferable contamination (to which receptors can be exposed via inhalation and ingestion), and data from probe surveys were used to estimate the amount of both fixed and transferable contamination (from which receptors can receive external exposure). Two land use scenarios, current and future, and their subsequent exposure scenarios were explored in the BRE. Under the current land use scenario, two exposure scenarios were evaluated. The first was a worst-case industrial exposure scenario in which the receptor is a maintenance worker who works 8 hours/day, 350 days/year in the building for 25 years. In the second, more realistic exposure scenario, the receptor is a surveillance and maintenance (S ampersand M) worker who spends two 8-hour days/year in the building for 25 years

  3. Design/Installation and Structural Integrity Assessment of the Bethel Valley Low-Level Waste Collection and Transfer System Upgrade for Building 3544 (Process Waste Treatment Plant) at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-12-01

    This document describes and assesses planned modifications to be made to the Building 3544 Process Waste Treatment Plant of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in response to the requirements of the Federal Facility Agreement (FFA) relating to environmental protection requirements for tank systems. The modifications include the provision of a new double contained LLW line replacing an existing buried line that does not provide double containment. This new above ground, double contained pipeline is provided to permit discharge of treated process waste fluid to an outside truck loading station. The new double contained discharge line is provided with leak detection and provisions to remove accumulated liquid. An existing LLW transfer pump, concentrated waste tank, piping and accessories are being utilized, with the addition of a secondary containment system comprised of a dike, a chemically resistant internal coating on the diked area surfaces and operator surveillance on a daily basis for the diked area leak detection. This assessment concludes that the planned modifications comply with applicable requirements of Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation

  4. 21 CFR 111.315 - What are the requirements for laboratory control processes?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the requirements for laboratory control... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Laboratory Operations § 111.315 What are the requirements for laboratory control...

  5. A Place for Materials Science: Laboratory Buildings and Interdisciplinary Research at the University of Pennsylvania

    Science.gov (United States)

    Choi, Hyungsub; Shields, Brit

    2015-01-01

    The Laboratory for Research on the Structure of Matter (LRSM), University of Pennsylvania, was built in 1965 as part of the Advanced Research Projects Agency's (ARPA) Interdisciplinary Laboratories (IDL) program intended to foster interdisciplinary research and training in materials science. The process that led to the construction of the…

  6. Discrete event simulation of the Defense Waste Processing Facility (DWPF) analytical laboratory

    International Nuclear Information System (INIS)

    Shanahan, K.L.

    1992-02-01

    A discrete event simulation of the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) analytical laboratory has been constructed in the GPSS language. It was used to estimate laboratory analysis times at process analytical hold points and to study the effect of sample number on those times. Typical results are presented for three different simultaneous representing increasing levels of complexity, and for different sampling schemes. Example equipment utilization time plots are also included. SRS DWPF laboratory management and chemists found the simulations very useful for resource and schedule planning

  7. Improved monitoring procedure for Iodine -131 in radiochemical process laboratory

    International Nuclear Information System (INIS)

    Singh, Pratap; Yadav, R.K.B.; Anilkumar, S.; Gopalakrishnan, R.K.; Chakraborty, S.

    2016-01-01

    Radiation Hazard Control Unit at Isotope wing provides radiological safety support and advises for safe processing and production of radiopharmaceuticals. Tellurium Oxide (TeO 2 ), irradiated in a nuclear reactor, is processed in a process laboratory for separating 131 I using dry distillation technique. The workplace environment is being assessed for airborne radioactivity using installed Static Air Samplers (SASs). SASs contains two filter media (glass fibre and charcoal impregnated paper) to collect airborne 131 I radioactivity and laboratory air sampled at 50 litres per minutes (lpm). Personal Air Sampler (PAS) consists of three types of filters viz. a glass fibre, charcoal impregnated paper and cartridges containing activated charcoal granules. Three combinations were studied at a sampling rate of 5 lpm

  8. What's to Be Done About Laboratory Quality? Process Indicators, Laboratory Stewardship, the Outcomes Problem, Risk Assessment, and Economic Value: Responding to Contemporary Global Challenges.

    Science.gov (United States)

    Meier, Frederick A; Badrick, Tony C; Sikaris, Kenneth A

    2018-02-17

    For 50 years, structure, process, and outcomes measures have assessed health care quality. For clinical laboratories, structural quality has generally been assessed by inspection. For assessing process, quality indicators (QIs), statistical monitors of steps in the clinical laboratory total testing, have proliferated across the globe. Connections between structural and process laboratory measures and patient outcomes, however, have rarely been demonstrated. To inform further development of clinical laboratory quality systems, we conducted a selective but worldwide review of publications on clinical laboratory quality assessment. Some QIs, like seven generic College of American Pathologists Q-Tracks monitors, have demonstrated significant process improvement; other measures have uncovered critical opportunities to improve test selection and result management. The College of Pathologists of Australasia Key Indicator Monitoring and Management System has deployed risk calculations, introduced from failure mode effects analysis, as surrogate measures for outcomes. Showing economic value from clinical laboratory testing quality is a challenge. Clinical laboratories should converge on fewer (7-14) rather than more (21-35) process monitors; monitors should cover all steps of the testing process under laboratory control and include especially high-risk specimen-quality QIs. Clinical laboratory stewardship, the combination of education interventions among clinician test orderers and report consumers with revision of test order formats and result reporting schemes, improves test ordering, but improving result reception is more difficult. Risk calculation reorders the importance of quality monitors by balancing three probabilities: defect frequency, weight of potential harm, and detection difficulty. The triple approach of (1) a more focused suite of generic consensus quality indicators, (2) more active clinical laboratory testing stewardship, and (3) integration of formal

  9. Study of building materials impregnation processes by quasi-real-time neutron radiography

    International Nuclear Information System (INIS)

    Nemec, T.; Rant, J.; Apih, V.; Glumac, B.

    1999-01-01

    Neutron radiography (NR) is a useful non-destructive method for determination of hydrogen content in various building and technical materials. Monitoring of transport processes of moisture and hydrogenous liquids in porous building materials is enabled by fast, quasi-real-time NR methods based on novel imaging plate neutron detectors (IP-NDs). Hydrogen content in the samples is determined by quantitative analysis of measured profiles of neutron attenuation in the samples. Detailed description of quantitative NR method is presented by the authors in another accompanying contribution at this conference. Deterioration of building materials is originated by different processes that all require presence of water therefore it is essential to limit or prevent the transport of water through the porous material. In this presentation, results of a study of clay brick impregnation by silicone based hydrophobic agents will be presented. Quantitative results obtained by NR imaging successfully explained the processes that occur during the impregnation of porous materials. Efficiency of hydrophobic treatment was quantitatively evaluated

  10. Energy Performance of Verandas in the Building Retrofit Process

    Directory of Open Access Journals (Sweden)

    Rossano Albatici

    2016-05-01

    Full Text Available Passive solar elements for both direct and indirect gains, are systems used to maintain a comfortable living environment while saving energy, especially in the building energy retrofit and adaptation process. Sunspaces, thermal mass and glazing area and orientation have been often used in the past to guarantee adequate indoor conditions when mechanical devices were not available. After a period of neglect, nowadays they are again considered as appropriate systems to help face environmental issues in the building sector, and both international and national legislation takes into consideration the possibility of including them in the building planning tools, also providing economic incentives. Their proper design needs dynamic simulation, often difficult to perform and time consuming. Moreover, results generally suffer from several uncertainties, so quasi steady-state procedures are often used in everyday practice with good results, but some corrections are still needed. In this paper, a comparative analysis of different solutions for the construction of verandas in an existing building is presented, following the procedure provided by the slightly modified and improved Standard EN ISO 13790:2008. Advantages and disadvantages of different configurations considering thermal insulation, windows typology and mechanical ventilation systems are discussed and a general intervention strategy is proposed. The aim is to highlight the possibility of using sunspaces in order to increase the efficiency of the existing building stock, considering ease of construction and economic viability.

  11. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-04-01

    This report describes background research for preparation of a plan for development of whole-building energy targets for new commercial buildings. The lead laboratory for this program is the Pacific Northwest Laboratory. A wide variety of expertise and resources from industry, academia, other government entities, and other DOE laboratories are used in planning, reviewing and conducting research activities. Cooperative and complementary research development, and technology transfer activities with other interested organizations are actively pursued.

  12. Metadata and their impact on processes in Building Information Modeling

    Directory of Open Access Journals (Sweden)

    Vladimir Nyvlt

    2014-04-01

    Full Text Available Building Information Modeling (BIM itself contains huge potential, how to increase effectiveness of every project in its all life cycle. It means from initial investment plan through project and building-up activities to long-term usage and property maintenance and finally demolition. Knowledge Management or better say Knowledge Sharing covers two sets of tools, managerial and technological. Manager`s needs are real expectations and desires of final users in terms of how could they benefit from managing long-term projects, covering whole life cycle in terms of sparing investment money and other resources. Technology employed can help BIM processes to support and deliver these benefits to users. How to use this technology for data and metadata collection, storage and sharing, which processes may these new technologies deploy. We will touch how to cover optimized processes proposal for better and smooth support of knowledge sharing within project time-scale, and covering all its life cycle.

  13. The Effect of Sloshing on a Tank Pressure Build-up Unit

    OpenAIRE

    Banne, Håvard Bolstad

    2017-01-01

    This thesis work has aimed to identify how sloshing will affect a liquefied natural gas (LNG) fuel tank. The physical nature of LNG means it needs to be kept cooled and pressurized in order to remain in a liquid state. By implementing a pressure build-up unit (PBU) it is possible to pressurize the tank vaporizing the tank’s contents, for the vapour then to return to tank in a loop, building pressure in the process. A tank pressure build-up unit has been built in the laboratory ...

  14. Building and Rebuilding: The National Public Health Laboratory Systems and Services Before and After the Earthquake and Cholera Epidemic, Haiti, 2009-2015.

    Science.gov (United States)

    Jean Louis, Frantz; Buteau, Josiane; Boncy, Jacques; Anselme, Renette; Stanislas, Magalie; Nagel, Mary C; Juin, Stanley; Charles, Macarthur; Burris, Robert; Antoine, Eva; Yang, Chunfu; Kalou, Mireille; Vertefeuille, John; Marston, Barbara J; Lowrance, David W; Deyde, Varough

    2017-10-01

    Before the 2010 devastating earthquake and cholera outbreak, Haiti's public health laboratory systems were weak and services were limited. There was no national laboratory strategic plan and only minimal coordination across the laboratory network. Laboratory capacity was further weakened by the destruction of over 25 laboratories and testing sites at the departmental and peripheral levels and the loss of life among the laboratory health-care workers. However, since 2010, tremendous progress has been made in building stronger laboratory infrastructure and training a qualified public health laboratory workforce across the country, allowing for decentralization of access to quality-assured services. Major achievements include development and implementation of a national laboratory strategic plan with a formalized and strengthened laboratory network; introduction of automation of testing to ensure better quality of results and diversify the menu of tests to effectively respond to outbreaks; expansion of molecular testing for tuberculosis, human immunodeficiency virus, malaria, diarrheal and respiratory diseases; establishment of laboratory-based surveillance of epidemic-prone diseases; and improvement of the overall quality of testing. Nonetheless, the progress and gains made remain fragile and require the full ownership and continuous investment from the Haitian government to sustain these successes and achievements.

  15. Building maintenance processes and practices the case of a fast developing country

    CERN Document Server

    Olanrewaju, Abdul Lateef

    2015-01-01

    This book is designed to be an inclusive for the best practice approach to building maintenance management, where the processes, procedures and operational systems meet a high standard of professional and academic competence. It offers a different perspective on building maintenance management by presenting the schematic building maintenance value chain model and it’s implementation in Malaysian university buildings. The findings show an improvement to building performance, lower maintenance cost, building sustainability and increased maintenance service user satisfaction. The learning outcomes and summaries provided for each chapter and the extensive use of tables and figures add to the readability of the text. Though the book is based on data from Malaysia, it is useful for a much wider audience, and the informal writing style makes it an interesting reference source. This book is valuable for readers who are practitioners, professionals and for academic institutions that offer courses in the build...

  16. Building Capacity in Community-Based Participatory Research Partnerships Through a Focus on Process and Multiculturalism.

    Science.gov (United States)

    Corbie-Smith, Giselle; Bryant, Angela R; Walker, Deborah J; Blumenthal, Connie; Council, Barbara; Courtney, Dana; Adimora, Ada

    2015-01-01

    In health research, investigators and funders are emphasizing the importance of collaboration between communities and academic institutions to achieve health equity. Although the principles underlying community-academic partnered research have been well-articulated, the processes by which partnerships integrate these principles when working across cultural differences are not as well described. We present how Project GRACE (Growing, Reaching, Advocating for Change and Empowerment) integrated participatory research principles with the process of building individual and partnership capacity. We worked with Vigorous Interventions In Ongoing Natural Settings (VISIONS) Inc., a process consultant and training organization, to develop a capacity building model. We present the conceptual framework and multicultural process of change (MPOC) that was used to build individual and partnership capacity to address health disparities. The process and capacity building model provides a common language, approach, and toolset to understand differences and the dynamics of inequity. These tools can be used by other partnerships in the conduct of research to achieve health equity.

  17. Accreditation of Medical Laboratories – System, Process, Benefits for Labs

    Directory of Open Access Journals (Sweden)

    Zima Tomáš

    2017-09-01

    Full Text Available One and key of the priorities in laboratory medicine is improvement of quality management system for patient safety. Quality in the health care is tightly connected to the level of excellence of the health care provided in relation to the current level of knowledge and technical development. Accreditation is an effective way to demonstrate competence of the laboratory, a tool to recognize laboratories world-wide, is linked to periodical audits, to stimulate the maintenance and improvement of the quality, which leads to high standard of services for clients (patients, health care providers, etc.. The strategic plans of IFCC and EFLM include focusing on accreditation of labs based on ISO standards and cooperation with European Accreditation and national accreditation bodies. IFCC and EFLM recognised that ISO 15189:2012 Medical laboratories – Requirements for quality and competence, encompasses all the assessment criteria specified in the policy of quality. The last version is oriented to process approach with detailed division and clearly defined requirements. The accreditation of labs improves facilitation of accurate and rapid diagnostics, efficiency of treatment and reduction of errors in the laboratory process. Accreditation is not about who the best is, but who has a system of standard procedures with aim to improve the quality and patient safety. Quality system is about people, with people and for people.

  18. Description of the EDF research and development laboratory's radiographic picture processing system

    International Nuclear Information System (INIS)

    Brillault, B.

    1985-01-01

    A digital radiographic picture processing system has been developed at the EDF Research and Development Laboratory to be supplied to EDF radiography experts. We describe it in pointing out the difficulties of radiograph digitization but also the numerous processing possibilities. The final goal of the Laboratory work is to extract the information from industrial radiographs by digital means. Our study is divided into three parts: digitization by a microdensitometer; display, processing and quantization of flaws; and, digital storing. 5 refs

  19. Overview of Commercial Building Partnerships in Higher Education

    Energy Technology Data Exchange (ETDEWEB)

    Schatz, Glenn [Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2013-03-01

    Higher education uses less energy per square foot than most commercial building sectors. However, higher education campuses house energy-intensive laboratories and data centers that may spend more than this average; laboratories, in particular, are disproportionately represented in the higher education sector. The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems–including some considered too costly or technologically challenging–and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions.

  20. Dry sample storage system for an analytical laboratory supporting plutonium processing

    International Nuclear Information System (INIS)

    Treibs, H.A.; Hartenstein, S.D.; Griebenow, B.L.; Wade, M.A.

    1990-01-01

    The Special Isotope Separation (SIS) plant is designed to provide removal of undesirable isotopes in fuel grade plutonium by the atomic vapor laser isotope separation (AVLIS) process. The AVLIS process involves evaporation of plutonium metal, and passage of an intense beam of light from a laser through the plutonium vapor. The laser beam consists of several discrete wavelengths, tuned to the precise wavelength required to ionize the undesired isotopes. These ions are attracted to charged plates, leaving the bulk of the plutonium vapor enriched in the desired isotopes to be collected on a cold plate. Major portions of the process consist of pyrochemical processes, including direct reduction of the plutonium oxide feed material with calcium metal, and aqueous processes for purification of plutonium in residues. The analytical laboratory for the plant is called the Material and Process Control Laboratory (MPCL), and provides for the analysis of solid and liquid process samples

  1. Building an ontology of pulmonary diseases with natural language processing tools using textual corpora.

    Science.gov (United States)

    Baneyx, Audrey; Charlet, Jean; Jaulent, Marie-Christine

    2007-01-01

    Pathologies and acts are classified in thesauri to help physicians to code their activity. In practice, the use of thesauri is not sufficient to reduce variability in coding and thesauri are not suitable for computer processing. We think the automation of the coding task requires a conceptual modeling of medical items: an ontology. Our task is to help lung specialists code acts and diagnoses with software that represents medical knowledge of this concerned specialty by an ontology. The objective of the reported work was to build an ontology of pulmonary diseases dedicated to the coding process. To carry out this objective, we develop a precise methodological process for the knowledge engineer in order to build various types of medical ontologies. This process is based on the need to express precisely in natural language the meaning of each concept using differential semantics principles. A differential ontology is a hierarchy of concepts and relationships organized according to their similarities and differences. Our main research hypothesis is to apply natural language processing tools to corpora to develop the resources needed to build the ontology. We consider two corpora, one composed of patient discharge summaries and the other being a teaching book. We propose to combine two approaches to enrich the ontology building: (i) a method which consists of building terminological resources through distributional analysis and (ii) a method based on the observation of corpus sequences in order to reveal semantic relationships. Our ontology currently includes 1550 concepts and the software implementing the coding process is still under development. Results show that the proposed approach is operational and indicates that the combination of these methods and the comparison of the resulting terminological structures give interesting clues to a knowledge engineer for the building of an ontology.

  2. Collection, transport and general processing of clinical specimens in Microbiology laboratory.

    Science.gov (United States)

    Sánchez-Romero, M Isabel; García-Lechuz Moya, Juan Manuel; González López, Juan José; Orta Mira, Nieves

    2018-02-06

    The interpretation and the accuracy of the microbiological results still depend to a great extent on the quality of the samples and their processing within the Microbiology laboratory. The type of specimen, the appropriate time to obtain the sample, the way of sampling, the storage and transport are critical points in the diagnostic process. The availability of new laboratory techniques for unusual pathogens, makes necessary the review and update of all the steps involved in the processing of the samples. Nowadays, the laboratory automation and the availability of rapid techniques allow the precision and turn-around time necessary to help the clinicians in the decision making. In order to be efficient, it is very important to obtain clinical information to use the best diagnostic tools. Copyright © 2018 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  3. Building 7602 Decontamination and Decommissioning for Reuse by Spallation Neutron Source

    International Nuclear Information System (INIS)

    Brill, A.; Berger, J.; Kelsey, A.; Plummer, K.

    2002-01-01

    Building 7602 at the Oak Ridge National Laboratory (ORNL) was constructed in 1963 as a Reactor Service Building for the Experimental Gas-Cooled Reactor; the reactor was never fueled or operated, and the project was terminated in 1965. Significant building modifications were performed during the late 1970s and early 1980s. Beginning in 1984, separation processes and equipment development and testing were initiated for the Consolidated Fuel Reprocessing Program (CFRP). The principal materials used in the processes were depleted and natural uranium, nitric acid, and organic solvents. CFRP operations continued until 1994 when the program was discontinued and the facility declared surplus to the U.S. Department of Energy (DOE). Systems and equipment were shut down; feed and waste materials were removed; and process fluids, chemicals, and uranium were drained and flushed from systems. This paper will present an overview of the Building 7602 D and D activities, final radiological survey , facility modifications, and project interfaces

  4. LOGISTICAL SUPPORT OF PROCESSES OF SORTING OUT OF THE DESTROYED BUILDING OBJECTS

    Directory of Open Access Journals (Sweden)

    SHATOV S. V.

    2016-09-01

    Full Text Available Summary. Raising of problem. Natural calamities, technogenic catastrophes and failures, result in destruction of building objects. Under the obstructions of destructions there can be victims. The most widespread technogenic failure are explosions of domestic gas. The structure of obstructions changes depending on parameters and direction of explosion, first of all size and location of wreckages. Sorting out of obstructions is executed by machines and mechanisms which do not answer the requirements of these works, that predetermines falling short of logistical support to the requirements of rescue or restoration works, and it increases terms and labour intensiveness of their conduct. Development of technological decisions is therefore needed for the effective sorting out of destructions of building objects. Purpose. Development of methodology of determination of logistical support of processes of sorting out of destructions of building and building. Conclusion. Experience of works shows on sorting out of the destroyed building objects, that they are executed with the use of imperfect logistical support, which are not taken into account by character of destruction of objects and is based on the use of buildings machines which do not answer the requirements of these processes, that results in considerable resource losses. Building machines with a multipurpose equipment, which provide the increase of efficiency of implementation of rescue and restoration works, are worked out. Methodology of determination of number of technique is worked out for providing of material-supply of sorting out of destructions, in particular on the initial stage of rescue works for liberation of victims from under obstructions.

  5. Solar buildings program contract summary, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries and by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.

  6. The building process of single-family houses and the embeddedness (or disembeddedness) of energy

    International Nuclear Information System (INIS)

    Palm, Jenny

    2013-01-01

    People building their own houses have, at least theoretically, substantial autonomy when choosing, for example, a heating system and windows. In this article, focus is on the process of building new single-family houses and how energy efficiency and energy-efficient technology are incorporated into the building process. The conclusions emphasize energy as only one factor in housing purchase decisions. It is a big challenge to make low-energy building important to consumers. Consumer preferences for new products are unlikely to fully develop unless individuals have the opportunity to interact with them. It is difficult for consumers to know what to ask for if they lack experience of energy-efficient technologies. In the studied cases, the building codes and established standards became extremely decisive for how energy issues were included in the process. There is a need to change the design of incentives so as to make the least energy-efficient choice the most expensive. The most energy-efficient solution should be standard, and if the buyer wants to depart from that standard and build using less energy-efficient construction, then that should cost more. -- Highlights: •Actors do not see energy efficiency as a critical problem. •Factors other than costs and price were important in the decision making. •Energy issues just one factor in housing purchase decisions. •The consumers don′t know what to ask for. •Building norms should require the most energy efficient solution

  7. Project of an integrated calibration laboratory of instruments at IPEN

    International Nuclear Information System (INIS)

    Barros, Gustavo Adolfo San Jose

    2009-01-01

    The Calibration Laboratory of Instruments of Instituto de Pesquisas Energeticas e Nucleares offers calibration services of radiation detectors used in radioprotection, diagnostic radiology and radiotherapy, for IPEN and for external facilities (public and private). One part of its facilities is located in the main building, along with other laboratories and study rooms, and another part in an isolated building called Bunker. For the optimization, modernization and specially the safety, the laboratories in the main building shall be transferred to an isolated place. In this work, a project of an integrated laboratory for calibration of instruments was developed, and it will be an expansion of the current Calibration Laboratory of Instruments of IPEN. Therefore, a series of radiometric monitoring of the chosen localization of the future laboratory was realized, and all staff needs (dimensions and disposition of the study rooms and laboratories) were defined. In this project, the laboratories with X ray equipment, alpha and beta radiation sources were located at an isolated part of the building, and the wall shielding was determined, depending on the use of each laboratory. (author)

  8. Characterization of the Three Mile Island Unit-2 reactor building atmosphere prior to the reactor building purge

    International Nuclear Information System (INIS)

    Hartwell, J.K.; Mandler, J.W.; Duce, S.W.; Motes, B.G.

    1981-05-01

    The Three Mile Island Unit-2 reactor building atmosphere was sampled prior to the reactor building purge. Samples of the containment atmosphere were obtained using specialized sampling equipment installed through penetration R-626 at the 358-foot (109-meter) level of the TMI-2 reactor building. The samples were subsequently analyzed for radionuclide concentration and for gaseous molecular components (O 2 , N 2 , etc.) by two independent laboratories at the Idaho National Engineering Laboratory (INEL). The sampling procedures, analysis methods, and results are summarized

  9. Dynamic Characteristics of Buildings from Signal Processing of Ambient Vibration

    Science.gov (United States)

    Dobre, Daniela; Sorin Dragomir, Claudiu

    2017-10-01

    The experimental technique used to determine the dynamic characteristics of buildings is based on records of low intensity oscillations of the building produced by various natural factors, such as permanent agitation type microseismic motions, city traffic, wind etc. The possibility of recording these oscillations is provided by the latest seismic stations (Geosig and Kinemetrics digital accelerographs). The permanent microseismic agitation of the soil is a complex form of stationary random oscillations. The building filters the soil excitation, selects and increases the components of disruptive vibrations corresponding to its natural vibration periods. For some selected buildings, with different instrumentation schemes for the location of sensors (in free-field, at basement, ground floor, roof level), a correlation between the dynamic characteristics resulted from signal processing of ambient vibration and from a theoretical analysis will be presented. The interpretation of recording results could highlight the behavior of the whole structure. On the other hand, these results are compared with those from strong motions, or obtained from a complex dynamic analysis, and they are quite different, but they are explicable.

  10. Laboratory waste minimization during the operation startup phase

    International Nuclear Information System (INIS)

    Morrison, J.A.

    1995-05-01

    The Waste Sampling and Characterization Facility (WSCF) Laboratory was opened for occupancy in October, 1994. It is the first of its kind on the Hanford Site, a low level lab located in an area of high level radiological material. The mission of the facility is to analyze process samples from two on-line effluent treatment plants. One of these plants is operating and the other is due to begin operations by the end of 1995. The VSCF also performs air sampling analysis for routine radiological surveillance filter papers drawn from around the Hanford Site. Because this type of laboratory had not been in operation before, there was only speculation about the types and amounts of waste that would be generated. The laboratory personnel assigned to WSCF were assembled from existing labs on the Hanford Site and from outside the Hanford Site community. For some, it was a first time experience working on a site where a twenty mile drive is sometimes required to visit another building. For others, it was a change in the way business is conducted using state-of-the-art equipment, a new building, and a chance to approach issues as a team from the beginning. It is how this team came together and the issues that were discussed, sometimes uncomfortably, that lead to the current success. The outcome of this process is discussed in this paper

  11. Pyrochemical processing automation at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Dennison, D.K.; Domning, E.E.; Seivers, R.

    1991-01-01

    Lawrence Livermore National Laboratory (LLNL) is developing a fully automated system for pyrochemical processing of special nuclear materials (SNM). The system utilizes a glove box, an automated tilt-pour furnace (TPF), an IBM developed gantry robot, and specialized automation tooling. All material handling within the glove box (i.e., furnace loading, furnace unloading, product and slag separation, and product packaging) is performed automatically. The objectives of the effort are to increase process productivity, decrease operator radiation, reduce process wastes, and demonstrate system reliability and availability. This paper provides an overview of the automated system hardware, outlines the overall operations sequence, and discusses the current status

  12. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    International Nuclear Information System (INIS)

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R ampersand D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI)

  13. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R&D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

  14. Precise turnaround time measurement of laboratory processes using radiofrequency identification technology.

    Science.gov (United States)

    Mayer, Horst; Brümmer, Jens; Brinkmann, Thomas

    2011-01-01

    To implement Lean Six Sigma in our central laboratory we conducted a project to measure single pre-analytical steps influencing turnaround time (TAT) of emergency department (ED) serum samples. The traditional approach of extracting data from the Laboratory Information System (LIS) for a retrospective calculation of a mean TAT is not suitable. Therefore, we used radiofrequency identification (RFID) chips for real time tracking of individual samples at any pre-analytical step. 1,200 serum tubes were labelled with RFID chips and were provided to the emergency department. 3 RFID receivers were installed in the laboratory: at the outlet of the pneumatic tube system, at the centrifuge, and in the analyser area. In addition, time stamps of sample entry at the automated sample distributor and communication of results from the analyser were collected from LIS. 1,023 labelled serum tubes arrived at our laboratory. 899 RFID tags were used for TAT calculation. The following transfer times were determined (median 95th percentile in min:sec): pneumatic tube system --> centrifuge (01:25/04:48), centrifuge --> sample distributor (14:06/5:33), sample distributor --> analysis system zone (02:39/15:07), analysis system zone --> result communication (12:42/22:21). Total TAT was calculated at 33:19/57:40 min:sec. Manual processes around centrifugation were identified as a major part of TAT with 44%/60% (median/95th percentile). RFID is a robust, easy to use, and error-free technology and not susceptible to interferences in the laboratory environment. With this study design we were able to measure significant variations in a single manual sample transfer process. We showed that TAT is mainly influenced by manual steps around the centrifugation process and we concluded that centrifugation should be integrated in solutions for total laboratory automation.

  15. Description of project for pretreatment and storage of wastes of L.P.R. (Radiochemical Processes Laboratory)

    International Nuclear Information System (INIS)

    Doval, J.C.F.; Mehlich, A.M.; Quilici, D.F.

    1987-01-01

    The aim of the project is to allow the start up and operation of LPR (Radiochemical Processes Laboratory) as part of the intended activities in the plant. In this paper, the pretreatment and storage of liquid wastes generated at the LPR are described. The pretreatment section will be set up inside the shielded cells already existent in the LPR, where a previous concentration through the evaporation of liquid wastes will take place. The storage section has to be constructed on purpose in order to temporarily store the concentrates. The cells of transference and preconditioning of solid wastes are also described. These cells will be mounted inside the building, allowing the handling of radioactive solids generated as effluents during the reprocessing plan. In the description, the use of non conventional materials for the boiler making and the construction of cells is specially mentioned. (Author)

  16. Research Staff | Buildings | NREL

    Science.gov (United States)

    Research Staff Research Staff Photo of Roderick Jackson Roderick Jackson Laboratory Program Manager -related research at NREL. He works closely with senior laboratory management to set the strategic agenda for NREL's buildings portfolio, including all research, development, and market implementation

  17. [AT THE CROSSROADS: THE ROLE OF LABORATORY MEDICINE IN THE PATIENT CARE PROCESS].

    Science.gov (United States)

    Geffen, Yuval; Zaidise, Itzhak

    2017-06-01

    In recent decades, the laboratory medicine profession has undergone significant changes due to both technological developments and economic constraints. Technological innovations support automation, provide faster and more accurate equipment, and allow increased efficiency through the use of commercial test kits. These changes, combined with budgetary constraints, have led to mergers and centralization of medical laboratories to optimize work and cut costs. While this centralization may be a business necessity, it leads to a disconnection between the laboratory and the clinical context. In addition, laboratory tests are treated as a commodity, which places emphasis on price only, rather than quality. In this article, we review the developments and changes that medical laboratories and the laboratory medicine profession have undergone in recent decades. We focus on technological and structural challenges affecting the functioning of medical laboratories and the relations between laboratory workers and medical teams. We then introduce vocational education changes required for the laboratory medicine profession. We propose defining the role of medical laboratory directors in terms of their basic training as medical doctors or doctors of science. We suggest that laboratory employees should become a reliable source of information regarding selection of appropriate test methods, processing data and presenting the results to the medical staff. Laboratory workers must deepen their clinical knowledge and become an integral part of the patient care process, along with medical and nursing staff. Special training programs for medical laboratory workers and directors must be developed in order to match the complex activities currently being conducted in laboratories.

  18. Biomedical laboratories: architecture and radioprotection principles; Laboratorios biomedicos: arquitetura e principios de radioprotecao

    Energy Technology Data Exchange (ETDEWEB)

    Lapa, Renata [Fundacao Inst. Oswaldo Cruz (CIBio/FIOCRUZ), Rio de Janeiro, RJ (Brazil). Comissao Interna de Biosseguranca; Salgado, Monica Santos [Universidade Federal do Rio de Janeiro (PROARQ/FAU/UFRJ), RJ (Brazil). Fac. de Arquitetura e Urbanismo. Programa de Pos-Graduacao em Arquitetura; Vieira, Valeria Michielin [Universidade Federal do Rio de Janeiro (PROARQ/FAU/UFRJ), RJ (Brazil). Fac. de Arquitetura e Urbanismo. Programa de Pos-Graduacao em Arquitetura; Fundacao Inst. Oswaldo Cruz (FIOCRUZ), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    In institutions where biological research are made and some technologies make use of radioisotope, the radiation protection is an issue of biosecurity for conceptual reasons. In the process of architectural design of Biomedical Laboratories, engineering and architecture reveal interfaces with other areas of knowledge and specific concepts. Exploring the role of architectural design in favor of personal and environmental protection in biological containment laboratories that handle non-sealed sources in research, the work discusses the triad that compose the principle of containment in health environments: best practices, protective equipment, physical facilities, with greater emphasis on the latter component. The shortcomings of the design process are reflected in construction and in use-operation and maintenance of these buildings, with direct consequences on the occupational health and safety, environmental and credibility of work processes. In this context, the importance of adoption of alternatives to improve the design process is confirmed, taking into account the early consideration of several variables involved and providing subsidies to the related laboratories . The research, conducted at FIOCRUZ - a Brazilian health institution, developed from the analysis of the participants in the architectural project, aiming at the formulation of design guidelines which could contribute to the rationalisation of this kind of building construction.

  19. A new building for testing magnets

    CERN Multimedia

    Corinne Pralavorio

    2016-01-01

    A ceremony to mark the laying of the foundation stone of Building 311, which will house a magnetic measurement laboratory, took place on 22 September.   Olaf Dunkel, head of the Building 311 project, José Miguel Jiménez, head of the Technology Department, and Lluis Miralles, head of the Site Management and Buildings Department, during the ceremony for the laying of the foundation stone of Building 311. Lluis Miralles, head of the Site Management and Buildings Department, José Miguel Jiménez, head of the Technology Department, Roberto Losito, head of the Engineering Department, and Simon Baird, head of the Occupational Health and Safety and Environmental Protection Unit, officially laid the foundation stone of Building 311 during a ceremony on Thursday, 22 September. Situated beside the water tower, the building will house a magnetic measurement laboratory for the Technology Department. With a floor space of around 1400 square metres, it will comprise a...

  20. The Role of Energy Storage in Commercial Building

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Subbarao, Krishnappa; Prakash Kumar, Nirupama; Bandyopadhyay, Gopal K.; Finley, C.; Koritarov, V. S.; Molburg, J. C.; Wang, J.; Zhao, Fuli; Brackney, L.; Florita, A. R.

    2010-09-30

    Motivation and Background of Study This project was motivated by the need to understand the full value of energy storage (thermal and electric energy storage) in commercial buildings, the opportunity of benefits for building operations and the potential interactions between a building and a smart grid infrastructure. On-site or local energy storage systems are not new to the commercial building sector; they have been in place in US buildings for decades. Most building-scale storage technologies are based on thermal or electrochemical storage mechanisms. Energy storage technologies are not designed to conserve energy, and losses associated with energy conversion are inevitable. Instead, storage provides flexibility to manage load in a building or to balance load and generation in the power grid. From the building owner's perspective, storage enables load shifting to optimize energy costs while maintaining comfort. From a grid operations perspective, building storage at scale could provide additional flexibility to grid operators in managing the generation variability from intermittent renewable energy resources (wind and solar). To characterize the set of benefits, technical opportunities and challenges, and potential economic values of storage in a commercial building from both the building operation's and the grid operation's view-points is the key point of this project. The research effort was initiated in early 2010 involving Argonne National Laboratory (ANL), the National Renewable Energy Laboratory (NREL), and Pacific Northwest National Laboratory (PNNL) to quantify these opportunities from a commercial buildings perspective. This report summarizes the early discussions, literature reviews, stakeholder engagements, and initial results of analyses related to the overall role of energy storage in commercial buildings. Beyond the summary of roughly eight months of effort by the laboratories, the report attempts to substantiate the importance of

  1. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  2. Decontamination and decommissioning of 61 plutonium gloveboxes in D-Wing, Building 212 Argonne National Laboratory-East: Final project report

    International Nuclear Information System (INIS)

    Cheever, C.L.; Rose, R.W.

    1996-09-01

    Argonne National Laboratory-East (ANL-E) is a government-owned, contractor operated, multipurpose research facility located 25 miles southwest of downtown Chicago on 689 hectares (1,700 acres) in DuPage County, Illinois, as shown in Figure 1.1. Building 212 is located in the central area of ANL-E, as shown in Figure 1.2. The purpose of this project was to eliminate the risk of radioactive material release from the contaminated glovebox systems and to make the laboratories available for unrestricted use. The following work objectives were established: (1) Identify and remove radioactive materials for return to ANL-E Special Materials control. (2) Remove and package the radioactively contaminated materials and equipment from the gloveboxes. (3) Decontaminate the gloveboxes to nontransuranic (non-TRU) levels. (4) Size-reduce and package the gloveboxes and support systems. (5) Document and dispose of the radioactive and mixed waste. (6) Decontaminate, survey, and release the nine laboratories and corridor areas for unrestricted use

  3. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  4. Site Characterization Plan for decontamination and decommissioning of Buildings 3506 and 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-09-01

    Buildings 3506, the Waste Evaporator Facility, and 3515, the Fission Product Pilot Plant, at Oak Ridge National Laboratory (ORNL), are scheduled for decontamination and decommissioning (D and D). This Site Characterization Plan (SCP) presents the strategy and techniques to be used to characterize Buildings 3506/3515 for the purpose of planning D and D activities. The elements of the site characterization for Buildings 3506/3515 are planning and preparation, field investigation, and characterization reporting. Other level of effort activities will include management and oversight, project controls, meetings, and progress reporting. The objective of the site characterization is to determine the nature and extent of radioactive and hazardous materials and other industrial hazards in and around the buildings. This information will be used in subsequent planning to develop a detailed approach for final decommissioning of the facilities: (1) to evaluate decommissioning alternatives and design the most cost-effective D and D approach; (2) to determine the level and type of protection necessary for D and D workers; and (3) to estimate the types and volumes of wastes generated during D and D activities. The current D and D characterization scope includes the entire building, including the foundation and equipment or materials within the building. To estimate potential worker exposure from the soil during D and D, some subfoundation soil sample collection is planned. Buildings 3506/3515 are located in the ORNL main plant area, to the west and east, respectively, of the South Tank Farm. Building 3506 was built in 1949 to house a liquid waste evaporator and was subsequently used for an incinerator experiment. Partial D and D was done prior to abandonment, and most equipment has been removed. Building 3515 was built in 1948 to house fission product separation equipment. In about 1960, all entrances were sealed with concrete block and mortar. Building 3515 is expected to be

  5. The laboratory efficiencies initiative: partnership for building a sustainable national public health laboratory system.

    Science.gov (United States)

    Ridderhof, John C; Moulton, Anthony D; Ned, Renée M; Nicholson, Janet K A; Chu, May C; Becker, Scott J; Blank, Eric C; Breckenridge, Karen J; Waddell, Victor; Brokopp, Charles

    2013-01-01

    Beginning in early 2011, the Centers for Disease Control and Prevention and the Association of Public Health Laboratories launched the Laboratory Efficiencies Initiative (LEI) to help public health laboratories (PHLs) and the nation's entire PHL system achieve and maintain sustainability to continue to conduct vital services in the face of unprecedented financial and other pressures. The LEI focuses on stimulating substantial gains in laboratories' operating efficiency and cost efficiency through the adoption of proven and promising management practices. In its first year, the LEI generated a strategic plan and a number of resources that PHL directors can use toward achieving LEI goals. Additionally, the first year saw the formation of a dynamic community of practitioners committed to implementing the LEI strategic plan in coordination with state and local public health executives, program officials, foundations, and other key partners.

  6. Improving Productivity in Building Construction – by Repetitions in Products, Processes, and Organisations

    DEFF Research Database (Denmark)

    Bekdik, Baris

    This thesis builds on several studies with connection to the lack of productivity in build-ing construction. It seeks to enhance the conditions for improving productivity in the fragmented building construction industry, by exploring how a modular thinking of products, processes and organisations...... can be reapplied on new building construction projects. Complexity theory is used for diagnosis and modularity theory for the remedy towards the high degree of complexity, which is seen as the root of unproductivity. De-sign Research Methodology is followed to structure and organise the different...... from the practitioner’s perspective. In the second part of the exploratory study, examples of the fragmented kinds of modu-lar applications around the world are compiled in order to demonstrate the inconsistent use, but still universal appeal that the approach carries with respect to building construc-tion...

  7. Improving Histopathology Laboratory Productivity: Process Consultancy and A3 Problem Solving

    Directory of Open Access Journals (Sweden)

    Kutsal YÖRÜKOĞLU

    2017-01-01

    Full Text Available Objective: The ISO 17020 quality program has been run in our pathology laboratory for four years to establish an action plan for correction and prevention of identified errors. In this study, we aimed to evaluate the errors that we could not identify through ISO 17020 and/or solve by means of process consulting. Process consulting is carefully intervening in a group or team to help it to accomplish its goals. Material and Method: The A3 problem solving process was run under the leadership of a ‘workflow, IT and consultancy manager’. An action team was established consisting of technical staff. A root cause analysis was applied for target conditions, and the 6-S method was implemented for solution proposals. Applicable proposals were activated and the results were rated by six-sigma analysis. Non-applicable proposals were reported to the laboratory administrator. Results: A mislabelling error was the most complained issue triggering all pre-analytical errors. There were 21 non-value added steps grouped in 8 main targets on the fish bone graphic (transporting, recording, moving, individual, waiting, over-processing, over-transaction and errors. Unnecessary redundant requests, missing slides, archiving issues, redundant activities, and mislabelling errors were proposed to be solved by improving visibility and fixing spaghetti problems. Spatial re-organization, organizational marking, re-defining some operations, and labeling activities raised the six sigma score from 24% to 68% for all phases. Operational transactions such as implementation of a pathology laboratory system was suggested for long-term improvement. Conclusion: Laboratory management is a complex process. Quality control is an effective method to improve productivity. Systematic checking in a quality program may not always find and/or solve the problems. External observation may reveal crucial indicators about the system failures providing very simple solutions.

  8. Improving Histopathology Laboratory Productivity: Process Consultancy and A3 Problem Solving.

    Science.gov (United States)

    Yörükoğlu, Kutsal; Özer, Erdener; Alptekin, Birsen; Öcal, Cem

    2017-01-01

    The ISO 17020 quality program has been run in our pathology laboratory for four years to establish an action plan for correction and prevention of identified errors. In this study, we aimed to evaluate the errors that we could not identify through ISO 17020 and/or solve by means of process consulting. Process consulting is carefully intervening in a group or team to help it to accomplish its goals. The A3 problem solving process was run under the leadership of a 'workflow, IT and consultancy manager'. An action team was established consisting of technical staff. A root cause analysis was applied for target conditions, and the 6-S method was implemented for solution proposals. Applicable proposals were activated and the results were rated by six-sigma analysis. Non-applicable proposals were reported to the laboratory administrator. A mislabelling error was the most complained issue triggering all pre-analytical errors. There were 21 non-value added steps grouped in 8 main targets on the fish bone graphic (transporting, recording, moving, individual, waiting, over-processing, over-transaction and errors). Unnecessary redundant requests, missing slides, archiving issues, redundant activities, and mislabelling errors were proposed to be solved by improving visibility and fixing spaghetti problems. Spatial re-organization, organizational marking, re-defining some operations, and labeling activities raised the six sigma score from 24% to 68% for all phases. Operational transactions such as implementation of a pathology laboratory system was suggested for long-term improvement. Laboratory management is a complex process. Quality control is an effective method to improve productivity. Systematic checking in a quality program may not always find and/or solve the problems. External observation may reveal crucial indicators about the system failures providing very simple solutions.

  9. Building in the 'Historic Villages of Portugal': Social Processes, Practices and Agents

    Directory of Open Access Journals (Sweden)

    Luís Silva

    2011-03-01

    Full Text Available ‘Historic Villages of Portugal’ is the label of a tourist network created by a local development programme applied in twelve villages located in the centro region of Portugal. This article focuses on the social processes, practices, and agents involved in heritage building within the framework of this programme. The main argument is that heritage building entails processes of protection, appropriation, and manipulation of cultural expressions for tourist consumption, following international trends on heritage and development. These processes implicate tensions, conflicts, negotiations and cooperation among those who intervene, above all political authorities, specialists in historic conservation (principally architects the tourism sector, and local populations. Historic conservationists have a ‘monumental’ vision of heritage, which does not correspond to the ‘social’ vision of the majority of the residents in the protected spaces.

  10. Final deactivation project report on the High Radiation Level Analytical Facility, Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S ampersand M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S ampersand M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S ampersand M effort would be required to maintain the building safety envelope. Other than the minimal S ampersand M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S ampersand M until decommissioning activities begin

  11. Final deactivation project report on the High Radiation Level Analytical Facility, Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S&M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S&M effort would be required to maintain the building safety envelope. Other than the minimal S&M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S&M until decommissioning activities begin.

  12. Software process improvement in the NASA software engineering laboratory

    Science.gov (United States)

    Mcgarry, Frank; Pajerski, Rose; Page, Gerald; Waligora, Sharon; Basili, Victor; Zelkowitz, Marvin

    1994-01-01

    The Software Engineering Laboratory (SEL) was established in 1976 for the purpose of studying and measuring software processes with the intent of identifying improvements that could be applied to the production of ground support software within the Flight Dynamics Division (FDD) at the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC). The SEL has three member organizations: NASA/GSFC, the University of Maryland, and Computer Sciences Corporation (CSC). The concept of process improvement within the SEL focuses on the continual understanding of both process and product as well as goal-driven experimentation and analysis of process change within a production environment.

  13. Lipid Processing Technology: Building a Multilevel Modeling Network

    DEFF Research Database (Denmark)

    Diaz Tovar, Carlos Axel; Mustaffa, Azizul Azri; Hukkerikar, Amol

    2011-01-01

    of a computer aided multilevel modeling network consisting a collection of new and adopted models, methods and tools for the systematic design and analysis of processes employing lipid technology. This is achieved by decomposing the problem into four levels of modeling: 1. pure component properties; 2. mixtures...... and phase behavior; 3. unit operations; and 4. process synthesis and design. The methods and tools in each level include: For the first level, a lipid‐database of collected experimental data from the open literature, confidential data from industry and generated data from validated predictive property...... of these unit operations with respect to performance parameters such as minimum total cost, product yield improvement, operability etc., and process intensification for the retrofit of existing biofuel plants. In the fourth level the information and models developed are used as building blocks...

  14. Using generic tool kits to build intelligent systems

    Science.gov (United States)

    Miller, David J.

    1994-01-01

    The Intelligent Systems and Robots Center at Sandia National Laboratories is developing technologies for the automation of processes associated with environmental remediation and information-driven manufacturing. These technologies, which focus on automated planning and programming and sensor-based and model-based control, are used to build intelligent systems which are able to generate plans of action, program the necessary devices, and use sensors to react to changes in the environment. By automating tasks through the use of programmable devices tied to computer models which are augmented by sensing, requirements for faster, safer, and cheaper systems are being satisfied. However, because of the need for rapid cost-effect prototyping and multi-laboratory teaming, it is also necessary to define a consistent approach to the construction of controllers for such systems. As a result, the Generic Intelligent System Controller (GISC) concept has been developed. This concept promotes the philosophy of producing generic tool kits which can be used and reused to build intelligent control systems.

  15. Conditions for building a community of practice in an advanced physics laboratory

    Science.gov (United States)

    Irving, Paul W.; Sayre, Eleanor C.

    2014-06-01

    We use the theory of communities of practice and the concept of accountable disciplinary knowledge to describe how a learning community develops in the context of an upper-division physics laboratory course. The change in accountable disciplinary knowledge motivates students' enculturation into a community of practice. The enculturation process is facilitated by four specific structural features of the course and supported by a primary instructional choice. The four structural features are "paucity of instructor time," "all in a room together," "long and difficult experiments," and "same experiments at different times." The instructional choice is the encouragement of the sharing and development of knowledge and understanding by the instructor. The combination of the instructional choice and structural features promotes the development of the learning community in which students engage in authentic practices of a physicist. This results in a classroom community that can provide students with the opportunity to have an accelerated trajectory towards being a more central participant of the community of a practice of physicists. We support our claims with video-based observations of laboratory classroom interactions and individual, semistructured interviews with students about their laboratory experiences and physics identity.

  16. Environmental Assessment for the proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California

    International Nuclear Information System (INIS)

    1995-08-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA), (DOE/EA-1087) evaluating the proposed action to modify existing Building 51B at Lawrence Berkeley National Laboratory (LBNL) to install and conduct experiments on a new Induction Linear Accelerator System. LBNL is located in Berkeley, California and operated by the University of California (UC). The project consists of placing a pre-fabricated building inside Building 51B to house a new 10 MeV heavy ion linear accelerator. A control room and other support areas would be provided within and directly adjacent to Building 51B. The accelerator system would be used to conduct tests, at reduced scale and cost, many features of a heavy-ion accelerator driver for the Department of Energy's inertial fusion energy program. Based upon information and analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  17. Software Engineering Laboratory (SEL) cleanroom process model

    Science.gov (United States)

    Green, Scott; Basili, Victor; Godfrey, Sally; Mcgarry, Frank; Pajerski, Rose; Waligora, Sharon

    1991-01-01

    The Software Engineering Laboratory (SEL) cleanroom process model is described. The term 'cleanroom' originates in the integrated circuit (IC) production process, where IC's are assembled in dust free 'clean rooms' to prevent the destructive effects of dust. When applying the clean room methodology to the development of software systems, the primary focus is on software defect prevention rather than defect removal. The model is based on data and analysis from previous cleanroom efforts within the SEL and is tailored to serve as a guideline in applying the methodology to future production software efforts. The phases that are part of the process model life cycle from the delivery of requirements to the start of acceptance testing are described. For each defined phase, a set of specific activities is discussed, and the appropriate data flow is described. Pertinent managerial issues, key similarities and differences between the SEL's cleanroom process model and the standard development approach used on SEL projects, and significant lessons learned from prior cleanroom projects are presented. It is intended that the process model described here will be further tailored as additional SEL cleanroom projects are analyzed.

  18. Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document

    International Nuclear Information System (INIS)

    1997-01-01

    In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today's design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building

  19. Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-04

    In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

  20. Ventilation Relevant Contaminants of Concern in Commercial Buildings Screening Process and Results

    Energy Technology Data Exchange (ETDEWEB)

    Parthasarathy, Srinandini [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); McKone, Thomas E. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Apte, Michael G. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)

    2011-04-29

    This report summarizes the screening procedure and its results for selecting contaminants of concern (COC), whose concentrations are affected by ventilation in commercial buildings. Many pollutants comprising criteria pollutants, volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs) and biological contaminants are found in commercial buildings. In this report, we focus primarily on identifying potential volatile organic COC, which are impacted by ventilation. In the future we plan to extend this effort to inorganic gases and particles. Our screening considers compounds detected frequently in indoor air and compares the concentrations to health-guidelines and thresholds. However, given the range of buildings under consideration, the contaminant sources and their concentrations will vary depending on the activity and use of the buildings. We used a literature review to identify a large list of chemicals found in commercial-building indoor air. The VOCs selected were subject to a two stage screening process, and the compounds of greater interest are included in priority List A. Other VOCs that have been detected in commercial buildings are included in priority List B. The compounds in List B, were further classified into groups B1, B2, B3, B4 in order of decreasing interest.

  1. Dynamic analysis and response spectra for the main process building of a reprocessing plant

    International Nuclear Information System (INIS)

    Hilpert, H.J.; Henkel, F.O.

    1988-01-01

    This paper deals with the determination of the floor response spectra for the main process building of the planned reprocessing plant due to the special loading conditions of earthquake, airplane crash and blast. With these spectra the stress and strain of the components and their bearing forces which react on the building can be calculated. Some special problems depending on the length of the building are not yet answered and will be discussed later. (orig.)

  2. Final deactivation project report on the Source Development Laboratory, building 3029, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this report is to document the condition of Building 3029 after completion of deactivation activities as outlined by the DOE Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration (EM-40). This report provides a history and profile of the facility prior to commencing deactivation activities and a profile of the building after completion of deactivation activities. Turnover items, such as the post-deactivation surveillance and maintenance (S ampersand M) plan, remaining hazardous materials, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the EM-60 turnover package are discussed. Building 3029 will require access to facilitate required S ampersand M activities to maintain the building safety envelope. building 3029 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S ampersand M effort would be required to maintain the building safety envelope. Other than the minimal S ampersand M activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S ampersand M. 5 refs., 7 figs., 3 tabs

  3. A Case Study of the Energy Design Process Used for A Retail Application

    Energy Technology Data Exchange (ETDEWEB)

    Hayter, S.; Torcellini, P.

    2000-08-28

    Designing and constructing low-energy buildings (buildings that consume 50% to 70% less energy than code-compliant buildings) require the design team to follow a process that considers how the building envelope and systems work together. The High-Performance Buildings Research Project at the National Renewable Energy Laboratory (NREL) developed a technique called the ``energy design process''. This process requires a design team to set energy-efficiency goals at the beginning of the pre-design phase. Detailed computer simulations used throughout the design and construction phases ensure that the building is optimized for energy efficiency and that changes to the design do not adversely affect energy performance. Properly commissioning the building and educating the building operators are the final steps to successfully constructing a low-energy building. NREL's High-Performance Buildings Research project applies the energy design process in the context of real building projects. This paper defines the energy design process and describes how the process was used to optimize the design of the BigHorn Center, a retail building in Silverthorne, Colorado.

  4. Commercial Building Partnership General Merchandise Energy Savings Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    The Commercial Building Partnership (CBP) paired selected commercial building owners and operators with representatives of DOE, national laboratories and private sector exports to explore energy efficiency measures across general merchandise commercial buildings.

  5. [The balanced scorecard used as a management tool in a clinical laboratory: internal business processes indicators].

    Science.gov (United States)

    Salinas La Casta, Maria; Flores Pardo, Emilio; Uris Selles, Joaquín

    2009-01-01

    to propose a set of indicators as a management tool for a clinical laboratory, by using the balanced scorecard internal business processes perspective. indicators proposed are obtained from different sources; external proficiency testing of the Valencia Community Government, by means of internal surveys and laboratory information system registers. One year testing process proportion indicators results are showed. internal management indicators are proposed (process, appropriateness and proficiency testing). The process indicators results show gradual improvement since its establishment. after one years of using a conceptually solid Balanced Scorecard Internal business processes perspective indicators, the obtained results validate the usefulness as a laboratory management tool.

  6. Comparison of Building Energy Modeling Programs: Building Loads

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Dandan [Tsinghua Univ., Beijing (China); Hong, Tianzhen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Yan, Da [Tsinghua Univ., Beijing (China); Wang, Chuang [Tsinghua Univ., Beijing (China)

    2012-06-01

    This technical report presented the methodologies, processes, and results of comparing three Building Energy Modeling Programs (BEMPs) for load calculations: EnergyPlus, DeST and DOE-2.1E. This joint effort, between Lawrence Berkeley National Laboratory, USA and Tsinghua University, China, was part of research projects under the US-China Clean Energy Research Center on Building Energy Efficiency (CERC-BEE). Energy Foundation, an industrial partner of CERC-BEE, was the co-sponsor of this study work. It is widely known that large discrepancies in simulation results can exist between different BEMPs. The result is a lack of confidence in building simulation amongst many users and stakeholders. In the fields of building energy code development and energy labeling programs where building simulation plays a key role, there are also confusing and misleading claims that some BEMPs are better than others. In order to address these problems, it is essential to identify and understand differences between widely-used BEMPs, and the impact of these differences on load simulation results, by detailed comparisons of these BEMPs from source code to results. The primary goal of this work was to research methods and processes that would allow a thorough scientific comparison of the BEMPs. The secondary goal was to provide a list of strengths and weaknesses for each BEMP, based on in-depth understandings of their modeling capabilities, mathematical algorithms, advantages and limitations. This is to guide the use of BEMPs in the design and retrofit of buildings, especially to support China’s building energy standard development and energy labeling program. The research findings could also serve as a good reference to improve the modeling capabilities and applications of the three BEMPs. The methodologies, processes, and analyses employed in the comparison work could also be used to compare other programs. The load calculation method of each program was analyzed and compared to

  7. Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley Low-Level Waste Collection and Transfer System upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-10-01

    This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements. Portions of the LLW system are several decades old, or older, and do not comply with current environmental protection regulations. Several subsystems of the LLW system have been designated to receive a state-of-the-art replacement and refurbishment. One such subsystem serves Building 2026, the High Radiation Level Analytical Laboratory. This assessment focuses on the scope of work for the Building 2026 replacement LLW Collection and Transfer System, including the provision of a new Monitoring and Control Station (Building 2099) to receive, store, and treat (adjust pH) low level radioactive waste

  8. Low Energy Accelerator Laboratory Technical Area 53, Los Alamos National Laboratory. Environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    This Environmental Assessment (EA) analyzes the potential environmental impacts that would be expected to occur if the Department of Energy (DOE) were to construct and operate a small research and development laboratory building at Technical Area (TA) 53 at the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico. DOE proposes to construct a small building to be called the Low Energy Accelerator Laboratory (LEAL), at a previously cleared, bladed, and leveled quarter-acre site next to other facilities housing linear accelerator research activities at TA-53. Operations proposed for LEAL would consist of bench-scale research, development, and testing of the initial section of linear particle accelerators. This initial section consists of various components that are collectively called an injector system. The anticipated life span of the proposed development program would be about 15 years

  9. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  10. Format for description of building envelope components for use in an optimization process

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian; Svendsen, Sv Aa Højgaard

    1999-01-01

    are decided by the architect or kept within limits due to public regulations, but even when these factors have been decided, some are left to be decided. Aspects like durability and the thermal performance are seldom specified by the architect, but might be addressed in national building codes. The national...... building codes specify minimum requirements for the aspects in question, but no trade-offs between the different aspects are allowed, being un-flexible. To allow for the use of optimization procedures in the design process a larger degree of flexibility is needed but first of all there is a need......When designing a building the number of possible combinations of aspects related to the performance of the building envelope are almost unlimited. Due to the physical laws governing e.g. the static performance of the building, some aspects should be kept within a certain interval. Other aspects...

  11. Building Technologies Research and Integration Center (BTRIC)

    Data.gov (United States)

    Federal Laboratory Consortium — The Building Technologies Research and Integration Center (BTRIC), in the Energy and Transportation Science Division (ETSD) of Oak Ridge National Laboratory (ORNL),...

  12. Building Green: The Adoption Process of LEED- and Energy Star-Rated Office Buildings

    Science.gov (United States)

    Malkani, Arvin P.

    2012-01-01

    There are opportunities for green building technology in office buildings to produce energy savings and cost efficiencies that can produce a positive economic and environmental impact. In order for these opportunities to be realized, however, decision makers must appreciate the value of green building technology. The objective of this research is…

  13. Analyses of postulated accidental releases of UF6 inside process buildings

    International Nuclear Information System (INIS)

    Oliveira Neto, Jose Messias de; Nunes, Beatriz Guimaraes; Dias, Cristiane

    2009-01-01

    Uranium Hexafluoride is a material used in the various processes which comprise the front end of the nuclear fuel cycle (conversion, enrichment and fuel fabrication). Confinement of UF 6 is a very important safety requirement since this material is highly reactive and presents safety hazards to humans. The present paper discusses the safety relevant aspects of accidental releases of UF 6 inside process confinement buildings. Postulated accidental scenarios are analyzed and their consequences evaluated. Implant releases rates are estimated using computer code predictions. A time dependent homogeneous compartment model is used to predict concentrations of UF 6 , hydrogen fluoride and uranyl fluoride inside a confinement building, as well as to evaluate source terms released to the atmosphere. These source terms can be used as input to atmospheric dispersion models to evaluate consequences to the environment. The results can also be used to define adequate protective measures for emergency situations. (author)

  14. Industrial versus Laboratory Clinker Processing Using Grinding Aids (Scale Effect

    Directory of Open Access Journals (Sweden)

    Joseph Jean Assaad

    2015-01-01

    Full Text Available The evaluation of grinding aid (GA effect on clinker processing in laboratory grinding mills is relatively simple. Yet, the results obtained cannot be directly transposed to industrial mills, given the fundamentally different operational modes and grinding parameters. This paper seeks to evaluate the scale effect by comparing the results obtained from a closed-circuit tube mill operating at 90 ton/hr to those determined using a 50-liter laboratory mill. Tests results have shown that the decrease in specific energy consumption (Ec due to glycol or amine-based GA can be evaluated under laboratory conditions. However, such tests underestimate the actual performance that could be achieved in real-scale mills; the Ec reduction due to GA is around twofold higher when grinding is performed in real-scale mill. Compared to industrial tests, the cement particle size distribution curves widened and shifted towards higher diameters when grinding was performed under laboratory conditions, particularly with GA additions. This led to remarkable changes in water demand, setting time, and 1- and 28-day compressive strengths.

  15. A refuge for inorganic chemistry: Bunsen's Heidelberg laboratory.

    Science.gov (United States)

    Nawa, Christine

    2014-05-01

    Immediately after its opening in 1855, Bunsen's Heidelberg laboratory became iconic as the most modern and best equipped laboratory in Europe. Although comparatively modest in size, the laboratory's progressive equipment made it a role model for new construction projects in Germany and beyond. In retrospect, it represents an intermediate stage of development between early teaching facilities, such as Liebig's laboratory in Giessen, and the new 'chemistry palaces' that came into existence with Wöhler's Göttingen laboratory of 1860. As a 'transition laboratory,' Bunsen's Heidelberg edifice is of particular historical interest. This paper explores the allocation of spaces to specific procedures and audiences within the laboratory, and the hierarchies and professional rites of passage embedded within it. On this basis, it argues that the laboratory in Heidelberg was tailored to Bunsen's needs in inorganic and physical chemistry and never aimed at a broad-scale representation of chemistry as a whole. On the contrary, it is an example of early specialisation within a chemical laboratory preceding the process of differentiation into chemical sub-disciplines. Finally, it is shown that the relatively small size of this laboratory, and the fact that after ca. 1860 no significant changes were made within the building, are inseparably connected to Bunsen's views on chemistry teaching.

  16. Application of Kalman Filter for Estimating a Process Disturbance in a Building Space

    Directory of Open Access Journals (Sweden)

    Deuk-Woo Kim

    2017-10-01

    Full Text Available This paper addresses an application of the Kalman filter for estimating a time-varying process disturbance in a building space. The process disturbance means a synthetic composite of heat gains and losses caused by internal heat sources e.g., people, lights, equipment, and airflows. It is difficult to measure and quantify the internal heat sources and airflows due to their dynamic nature and time-lag impact on indoor environment. To address this issue, a Kalman filter estimation method was used in this study. The Kalman filtering is well suited for situations when state variables of interest cannot be measured. Based on virtual and real experiments conducted in this study, it was found that the Kalman filter can be used to estimate the time-varying process disturbance in a building space.

  17. TA-03-0035 Press Building – D&D

    Energy Technology Data Exchange (ETDEWEB)

    Hasenack, Marvin Leroy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-02

    The Press Building was constructed in 1954 with 15,073 ft2 of floor space. It was built to house a 5000 ton double action Lake Erie hydraulic press and a uranium casting area. Missions included uranium activities associated with the Nuclear Weapons and Rover Rocket programs. At the end of the Rover program, the building continued to support various uranium materials science projects until the building was placed into a cold and dark status in 2013 and then was demolished in 2017. The building interior, the press, and associated systems were radiological contaminated and disposed of as low level waste. The demolition of this building opened up valuable real estate in the TA-3 area for the future construction of an ~11,000 Sq. Ft. Biosafety Level 2 laboratory and office building. This building will support the ongoing Bioscience Division mission at the laboratory.

  18. Central African Field Epidemiology and Laboratory Training Program: building and strengthening regional workforce capacity in public health.

    Science.gov (United States)

    Andze, Gervais Ondobo; Namsenmo, Abel; Illunga, Benoit Kebella; Kazambu, Ditu; Delissaint, Dieula; Kuaban, Christopher; Mbopi-Kéou, Francois-Xavier; Gabsa, Wilfred; Mulumba, Leopold; Bangamingo, Jean Pierre; Ngulefac, John; Dahlke, Melissa; Mukanga, David; Nsubuga, Peter

    2011-01-01

    The Central African Field Epidemiology and Laboratory Training Program (CAFELTP) is a 2-year public health leadership capacity building training program. It was established in October 2010 to enhance capacity for applied epidemiology and public health laboratory services in three countries: Cameroon, Central African Republic, and the Democratic Republic of Congo. The aim of the program is to develop a trained public health workforce to assure that acute public health events are detected, investigated, and responded to quickly and effectively. The program consists of 25% didactic and 75% practical training (field based activities). Although the program is still in its infancy, the residents have already responded to six outbreak investigations in the region, evaluated 18 public health surveillance systems and public health programs, and completed 18 management projects. Through these various activities, information is shared to understand similarities and differences in the region leading to new and innovative approaches in public health. The program provides opportunities for regional and international networking in field epidemiology and laboratory activities, and is particularly beneficial for countries that may not have the immediate resources to host an individual country program. Several of the trainees from the first cohort already hold leadership positions within the ministries of health and national laboratories, and will return to their assignments better equipped to face the public health challenges in the region. They bring with them knowledge, practical training, and experiences gained through the program to shape the future of the public health landscape in their countries.

  19. Building of nested components by a double-nozzle droplet deposition process

    Science.gov (United States)

    Li, SuLi; Wei, ZhengYing; Du, Jun; Zhao, Guangxi; Wang, Xin; Lu, BingHeng

    2016-07-01

    According to the nested components jointed with multiple parts,a double-nozzle droplet deposition process was put forward in this paper, and the experimental system was developed. Through the research on the properties of support materials and the process of double-nozzle droplet deposition, the linkage control of the metal droplet deposition and the support material extrusion was realized, and a nested component with complex construction was fabricated directly. Compared with the traditional forming processes, this double-nozzle deposition process has the advantages of short cycle, low cost and so on. It can provide an approach way to build the nested parts.

  20. Description of the Sandia National Laboratories science, technology & engineering metrics process.

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, Gretchen B.; Watkins, Randall D.; Trucano, Timothy Guy; Burns, Alan Richard; Oelschlaeger, Peter

    2010-04-01

    There has been a concerted effort since 2007 to establish a dashboard of metrics for the Science, Technology, and Engineering (ST&E) work at Sandia National Laboratories. These metrics are to provide a self assessment mechanism for the ST&E Strategic Management Unit (SMU) to complement external expert review and advice and various internal self assessment processes. The data and analysis will help ST&E Managers plan, implement, and track strategies and work in order to support the critical success factors of nurturing core science and enabling laboratory missions. The purpose of this SAND report is to provide a guide for those who want to understand the ST&E SMU metrics process. This report provides an overview of why the ST&E SMU wants a dashboard of metrics, some background on metrics for ST&E programs from existing literature and past Sandia metrics efforts, a summary of work completed to date, specifics on the portfolio of metrics that have been chosen and the implementation process that has been followed, and plans for the coming year to improve the ST&E SMU metrics process.

  1. School Building Organisation in Greece.

    Science.gov (United States)

    PEB Exchange, 2001

    2001-01-01

    Discusses the past and current organizational structure of Greece's School Building Organisation, a body established to work with government agencies in the design and construction of new buildings and the provisioning of educational equipment. Future planning to incorporate culture and creativity, sports, and laboratory learning in modern school…

  2. Level 3 baseline risk evaluation for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Golden, K.M.; Robers, S.K.; Cretella, F.M.

    1994-12-01

    This report presents the results of the Level 3 Baseline Risk Evaluation (BRE) performed on Building 3506 located at the Oak Ridge National Laboratory (ORNL). This BRE is intended to provide an analysis of the potential for adverse health effects (current or future) posed by contaminants at the facility. The decision was made to conduct a Level 3 (least rigorous) BRE because only residual contamination exists in the building. Future plans for the facility (demolition) also preclude a rigorous analysis. Site characterization activities for Building 3506 were conducted in fall of 1993. Concrete core samples were taken from the floors and walls of both the cell and the east gallery. These cores were analyzed for radionuclides and organic and inorganic chemicals. Smear samples and direct radiation measurements were also collected. Sediment exists on the floor of the cell and was also analyzed. To adequately characterize the risks posed by the facility, receptors for both current and potential future land uses were evaluated. For the current land use conditions, two receptors were evaluated. The first receptor is a hypothetical maintenance worker who spends 250 days (8 hours/day) for 25 years working in the facility. The remaining receptor evaluated is a hypothetical S and M worker who spends 2 days (8 hours/day) per year for 25 years working within the facility. This particular receptor best exemplifies the current worker scenario for the facility. The two current exposure scenarios and parameters of exposure (e.g., inhalation and ingestion rates) have been developed to provide a conservative (i.e. health protective) estimate of potential exposure

  3. Removal site evaluation report on Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report on Building 3019B at Oak Ridge National Laboratory was prepared to provide the environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility nd identify existing hazard areas requiring maintenance actions or remedial evaluation. The results of the removal site evaluation indicate that areas inside Building 3019B pose no imminent hazard because adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. A maintenance action, however, is being undertaken or proposed. Deteriorated and peeling exterior paint in areas on the west and south walls on the exterior of the building has an uninhibited pathway to the storm water drainage system and can potentially impact the local surface water during periods of storm water runoff. The paint is assumed to be lead based, thus posing a potential problem. In addition, the subsurface of all of the exterior walls may be radiologically contaminated. A maintenance action will be necessary to prevent further deterioration and dislodging of the paint

  4. Level 3 baseline risk evaluation for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Golden, K.M.; Robers, S.K.; Cretella, F.M.

    1994-12-01

    This report presents the results of the Level 3 Baseline Risk Evaluation (BRE) performed on Building 3506 located at the Oak Ridge National Laboratory (ORNL). This BRE is intended to provide an analysis of the potential for adverse health effects (current or future) posed by contaminants at the facility. The decision was made to conduct a Level 3 (least rigorous) BRE because only residual contamination exists in the building. Future plans for the facility (demolition) also preclude a rigorous analysis. Site characterization activities for Building 3506 were conducted in fall of 1993. Concrete core samples were taken from the floors and walls of both the cell and the east gallery. These cores were analyzed for radionuclides and organic and inorganic chemicals. Smear samples and direct radiation measurements were also collected. Sediment exists on the floor of the cell and was also analyzed. To adequately characterize the risks posed by the facility, receptors for both current and potential future land uses were evaluated. For the current land use conditions, two receptors were evaluated. The first receptor is a hypothetical maintenance worker who spends 250 days (8 hours/day) for 25 years working in the facility. The remaining receptor evaluated is a hypothetical S and M worker who spends 2 days (8 hours/day) per year for 25 years working within the facility. This particular receptor best exemplifies the current worker scenario for the facility. The two current exposure scenarios and parameters of exposure (e.g., inhalation and ingestion rates) have been developed to provide a conservative (i.e. health protective) estimate of potential exposure.

  5. The due diligence process for acquiring and building power plants

    International Nuclear Information System (INIS)

    Vallen, M.A.; Bullinger, C.D.

    1999-01-01

    The restructuring of the electric generating business is continuing at a torrid pace. New auctions of generation portfolios are initiated almost monthly, and announcements of new development projects arrive almost daily. It has become imperative, then, that participants in both acquisitions and development projects become conversant with the necessary due diligence process, a complex and critical task that can mean the difference between success and failure. A thorough due diligence process allows bidder/developers to uncover value and quantify liabilities before bidding/building, translating into the best analysis possible and resulting in a winning investment decision. This article describes the process by which buyers and developers approach and manage the due diligence process as a key step in making their investment decision

  6. Processing laboratory of radio sterilized biological tissues

    International Nuclear Information System (INIS)

    Aguirre H, Paulina; Zarate S, Herman; Silva R, Samy; Hitschfeld, Mario

    2005-01-01

    The nuclear development applications have also reached those areas related to health. The risk of getting contagious illnesses through applying biological tissues has been one of the paramount worries to be solved since infectious illnesses might be provoked by virus, fungis or bacterias coming from donors or whether they have been introduced by means of intermediate stages before the use of these tissues. Therefore it has been concluded that the tissue allografts must be sterilized. The sterilization of medical products has been one of the main applications of the ionizing radiations and that it is why the International Organization of Atomic Energy began in the 70s promoting works related to the biological tissue sterilization and pharmaceutical products. The development of different tissue preservation methods has made possible the creation of tissue banks in different countries, to deal with long-term preservation. In our country, a project was launched in 1998, 'Establishment of a Tissue Bank in Latino america', this project was supported by the OIEA through the project INT/ 6/ 049, and was the starting of the actual Processing Laboratory of Radioesterilized Biological Tissues (LPTR), leaded by the Chilean Nuclear Energy Commission (CCHEN). This first organization is part of a number of entities compounding the Tissue Bank in Chile, organizations such as the Transplantation Promotion Corporation hospitals and the LPTR. The working system is carried out by means of the interaction between the hospitals and the laboratory. The medical professionals perform the procuring of tissues in the hospitals, then send them to the LPTR where they are processed and sterilized with ionizing radiation. The cycle ends up with the tissues return released to the hospitals, where they are used, and then the result information is sent to the LPTR as a form of feedback. Up to now, human skin has been processed (64 donors), amniotic membranes (35 donors) and pig skin (175 portions

  7. Protein Laboratories in Single Location | Poster

    Science.gov (United States)

    By Andrew Stephen, Timothy Veenstra, and Gordon Whiteley, Guest Writers, and Ken Michaels, Staff Writer The Laboratory of Proteomics and Analytical Technologies (LPAT), Antibody Characterization Laboratory (ACL), and Protein Chemistry Laboratory (PCL), previously located on different floors or in different buildings, are now together on the first floor of C wing in the ATRF.

  8. Mood and implicit alcohol expectancy processes: predicting alcohol consumption in the laboratory.

    Science.gov (United States)

    Wardell, Jeffrey D; Read, Jennifer P; Curtin, John J; Merrill, Jennifer E

    2012-01-01

    Implicit positive alcohol expectancy (PAE) processes are thought to respond phasically to external and internal stimuli-including mood states-and so they may exert powerful proximal influences over drinking behavior. Although social learning theory contends that mood states activate mood-congruent implicit PAEs, which in turn lead to alcohol use, there is a dearth of experimental research examining this mediation model relative to observable drinking. Moreover, an expectancy theory perspective might suggest that, rather than influencing PAEs directly, mood may moderate the association between PAEs and drinking. To test these models, this study examined the role of mood in the association between implicitly measured PAE processes (i.e., latency to endorse PAEs) and immediate alcohol consumption in the laboratory. Gender differences in these processes also were examined. College students (N = 146) were exposed to either a positive, negative, or neutral mood induction procedure, completed a computerized PAE reaction time (RT) task, and subsequently consumed alcohol ad libitum. The mood manipulation had no direct effects on drinking in the laboratory, making the mediation hypothesis irrelevant. Instead, gender and mood condition moderated the association between RT to endorse PAEs and drinking in the laboratory. For males, RT to tension reduction PAEs was a stronger predictor of volume of beer consumed and peak blood alcohol concentration in the context of general arousal (i.e., positive and negative mood) relative to neutral mood. RT to PAEs did not predict drinking in the laboratory for females. The results show that PAE processes are important determinants of immediate drinking behavior in men, suggesting that biased attention to mood-relevant PAEs-as indicated by longer RTs-predicts greater alcohol consumption in the appropriate mood context. The findings also highlight the need to consider gender differences in PAE processes. This study underscores the need for

  9. Future analytical provision - Relocation of Sellafield Ltd Analytical Services Laboratory

    International Nuclear Information System (INIS)

    Newell, B.

    2015-01-01

    Sellafield Ltd Analytical Services provide an essential view on the environmental, safety, process and high hazard risk reduction performances by analysis of samples. It is the largest and most complex analytical services laboratory in Europe, with 150 laboratories (55 operational) and 350 staff (including 180 analysts). Sellafield Ltd Analytical Services Main Laboratory is in need of replacement. This is due to the age of the facility and changes to work streams. This relocation is an opportunity to -) design and commission bespoke MA (Medium-Active) cells, -) modify HA (High-Active) cell design to facilitate an in-cell laboratory, -) develop non-destructive techniques, -) open light building for better worker morale. The option chosen was to move the activities to the NNL Central laboratory (NNLCL) that is based at Sellafield and is the UK's flagship nuclear research and development facility. This poster gives a time schedule

  10. Conception through build of an automated liquids processing system for compound management in a low-humidity environment.

    Science.gov (United States)

    Belval, Richard; Alamir, Ab; Corte, Christopher; DiValentino, Justin; Fernandes, James; Frerking, Stuart; Jenkins, Derek; Rogers, George; Sanville-Ross, Mary; Sledziona, Cindy; Taylor, Paul

    2012-12-01

    Boehringer Ingelheim's Automated Liquids Processing System (ALPS) in Ridgefield, Connecticut, was built to accommodate all compound solution-based operations following dissolution in neat DMSO. Process analysis resulted in the design of two nearly identical conveyor-based subsystems, each capable of executing 1400 × 384-well plate or punch tube replicates per batch. Two parallel-positioned subsystems are capable of independent execution or alternatively executed as a unified system for more complex or higher throughput processes. Primary ALPS functions include creation of high-throughput screening plates, concentration-response plates, and reformatted master stock plates (e.g., 384-well plates from 96-well plates). Integrated operations included centrifugation, unsealing/piercing, broadcast diluent addition, barcode print/application, compound transfer/mix via disposable pipette tips, and plate sealing. ALPS key features included instrument pooling for increased capacity or fail-over situations, programming constructs to associate one source plate to an array of replicate plates, and stacked collation of completed plates. Due to the hygroscopic nature of DMSO, ALPS was designed to operate within a 10% relativity humidity environment. The activities described are the collaborative efforts that contributed to the specification, build, delivery, and acceptance testing between Boehringer Ingelheim Pharmaceuticals, Inc. and the automation integration vendor, Thermo Scientific Laboratory Automation (Burlington, ON, Canada).

  11. Dynamic analysis and response spectra for the main processing building of a reprocessing plant

    International Nuclear Information System (INIS)

    Mischke, J.; Hilpert, H.J.; Henkel, F.O.

    1984-01-01

    The article deals with the determination of the floor response spectra for the main processing building of the planned reprocessing plant due to the special loading conditions of earthquake, airplane crash and blast. With these spectra the stress and strain of the components and their bearing forces which react on the building can be calculated. (orig.) [de

  12. ISO 50001 for US Commercial Buildings - Current Status and Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Jingjing; Sheaffer, Paul

    2017-12-01

    ''ISO 50001: 2011 Energy management systems – Requirements with guidance for use'' is a voluntary International Standard which provides organizations a proven framework to manage energy and continuously improve their energy performance. Implementing ISO 50001 in the commercial building sector has its unique opportunities and challenges in comparison with the industrial sector. The energy footprint of a portfolio of commercial buildings can be just as significant as a large industrial facility in comparison. There are many energy-saving opportunities in commercial buildings that can be addressed without capital investments, and the perceived risks for making energy improvements can be lower than in the industrial sector. In addition, the energy-consuming systems in commercial buildings are limited in types and have many similarities across buildings, which makes it much easier to standardize many ISO 50001 required processes, 5 procedures and documents to simplify implementation. There are also some sector-unique challenges, such as less familiar with ISO systems and the certification process. Another challenge arises from the complexity in some buildings’ ownership, tenancy, and O&M responsibilities. This whitepaper discusses these opportunities and issues in detail. The paper also recommends the characteristics of organizations in the commercial building sector that can benefit the most from adopting the ISO 50001 standard – namely the “suitable market”. Eight segments (education, food sales, retail, inpatient health care, hospitality, office buildings, laboratories and data centers) within the commercial building sector are highlighted.

  13. A comparative study of the design and construction process of energy efficient buildings in Germany and Sweden

    International Nuclear Information System (INIS)

    Schade, Jutta; Wallström, Peter; Olofsson, Thomas; Lagerqvist, Ove

    2013-01-01

    Reducing the energy consumption of buildings is an important goal for the European Union. However, it is therefore of interest to investigate how different member states address these goals. Countries like Sweden and Germany have developed different strategies for energy conservation within the building sector. A longitudinal comparison between implemented energy conservation key policy instruments in Sweden and Germany and a survey regarding the management of energy requirements in the building process shows that: –No evidence is found that energy consumption is of great importance for producing competitive offers, either for Swedish or German clients. –The Swedish market-driven policy has not been as successful as the German regulation policy in decreasing the energy consumption of new buildings. –Building standards and regulations regarding energy performance affects how professionals are educated and the way energy requirements and demands are managed throughout the building process. In conclusion, the client's demand will govern the development of energy efficient buildings. Therefore, in order to use market-driven policies, the desired parameters must be of concern for the customer to influence the majority of building projects to be more energy efficient than is specified in national standards and regulations. - Highlights: ► Longitudinal comparison between implemented energy key policy instruments. ► A survey regarding the management of energy requirements in the building process. ► German energy regulation policy more successful as the Swedish marked orientation. ► The gap between technological possible and regulation need to be balanced

  14. Commercial Building Partnership Retail Food Sales Energy Savings Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    The Commercial Building Partnership (CBP) paired selected commercial building owners and operators with representatives of DOE, national laboratories and private sector exports to explore energy efficiency measures across general merchandise commercial buildings.

  15. Clandestine laboratory scene investigation and processing using portable GC/MS

    Science.gov (United States)

    Matejczyk, Raymond J.

    1997-02-01

    This presentation describes the use of portable gas chromatography/mass spectrometry for on-scene investigation and processing of clandestine laboratories. Clandestine laboratory investigations present special problems to forensic investigators. These crime scenes contain many chemical hazards that must be detected, identified and collected as evidence. Gas chromatography/mass spectrometry performed on-scene with a rugged, portable unit is capable of analyzing a variety of matrices for drugs and chemicals used in the manufacture of illicit drugs, such as methamphetamine. Technologies used to detect various materials at a scene have particular applications but do not address the wide range of samples, chemicals, matrices and mixtures that exist in clan labs. Typical analyses performed by GC/MS are for the purpose of positively establishing the identity of starting materials, chemicals and end-product collected from clandestine laboratories. Concerns for the public and investigator safety and the environment are also important factors for rapid on-scene data generation. Here is described the implementation of a portable multiple-inlet GC/MS system designed for rapid deployment to a scene to perform forensic investigations of clandestine drug manufacturing laboratories. GC/MS has long been held as the 'gold standard' in performing forensic chemical analyses. With the capability of GC/MS to separate and produce a 'chemical fingerprint' of compounds, it is utilized as an essential technique for detecting and positively identifying chemical evidence. Rapid and conclusive on-scene analysis of evidence will assist the forensic investigators in collecting only pertinent evidence thereby reducing the amount of evidence to be transported, reducing chain of custody concerns, reducing costs and hazards, maintaining sample integrity and speeding the completion of the investigative process.

  16. Five-Year NRHP Re-Evaluation of Historic Buildings Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ullrich, R A; Heidecker, K R

    2011-09-12

    The Lawrence Livermore National Laboratory (LLNL) 'Draft Programmatic Agreement among the Department of Energy and the California State Historic Preservation Officer Regarding Operation of Lawrence Livermore National Laboratory' requires a review and re-evaluation of the eligibility of laboratory properties for the National Register of Historic Places (NRHP) every five years. The original evaluation was published in 2005; this report serves as the first five-year re-evaluation. This re-evaluation includes consideration of changes within LLNL to management, to mission, and to the built environment. it also determines the status of those buildings, objects, and districts that were recommended as NRHP-eligible in the 2005 report. Buildings that were omitted from the earlier building list, those that have reached 50 years of age since the original assessment, and new buildings are also addressed in the re-evaluation.

  17. Pacific Northwest Laboratory ALARA Report for Calendar Year 1993

    International Nuclear Information System (INIS)

    Keller, S.L.

    1994-07-01

    This report provides summary results of the Calendar Year (CY) 1993 As Low As Reasonably Achievable (ALARA) Program at the Pacific Northwest Laboratory (PNL). This report includes information regarding whole-body exposures to radiation, and skin contaminations. The collective whole-body radiation dose to employees during 1993 was 0.58 person-sievert (58 person-rem). This dose was 11 percent lower than the projected dose of 0.65 person-sievert (65 person-rem). The Radiation Protection Section's Field Dosimetry Services group projected that no PNL employee's dose would exceed 0.02 sievert (2 rem) based on dosimeters processed during the year; no worker actually exceeded the limit by the end of CY 1993. There were 15 reported cases of skin contamination for PNL employees during 1993. This number of 60 percent of the projected total of 25 cases. There were an additional 21 cases of personal-effects contamination to PNL staff: Nine of these contamination events occurred at the 324 Building, nine occurred at the 325 Building, one occurred in the 327 Building, one occurred in the 3720 Building, and one occurred in the 326 Building. Line management set numerous challenging and production ALARA goals for their facilities. Appendix A describes the final status of the 1993 ALARA goals. Appendix B describes the radiological ALARA goals for 1994. The Radiation Protection Section of the Laboratory Safety Dept. routinely perform audits of radiological ALARA requirements for specific facilities with significant potential for exposure. These ALARA audits are part of a comprehensive safety audit of the facility, designed to evaluate and improve total safety performance

  18. SLIPTA e-Tool improves laboratory audit process in Vietnam and Cambodia.

    Science.gov (United States)

    Nguyen, Thuong T; McKinney, Barbara; Pierson, Antoine; Luong, Khue N; Hoang, Quynh T; Meharwal, Sandeep; Carvalho, Humberto M; Nguyen, Cuong Q; Nguyen, Kim T; Bond, Kyle B

    2014-01-01

    The Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist is used worldwide to drive quality improvement in laboratories in developing countries and to assess the effectiveness of interventions such as the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme. However, the paper-based format of the checklist makes administration cumbersome and limits timely analysis and communication of results. In early 2012, the SLMTA team in Vietnam developed an electronic SLIPTA checklist tool. The e-Tool was pilot tested in Vietnam in mid-2012 and revised. It was used during SLMTA implementation in Vietnam and Cambodia in 2012 and 2013 and further revised based on auditors' feedback about usability. The SLIPTA e-Tool enabled rapid turn-around of audit results, reduced workload and language barriers and facilitated analysis of national results. Benefits of the e-Tool will be magnified with in-country scale-up of laboratory quality improvement efforts and potential expansion to other countries.

  19. SLIPTA e-Tool improves laboratory audit process in Vietnam and Cambodia

    Directory of Open Access Journals (Sweden)

    Thuong T. Nguyen

    2014-11-01

    Full Text Available Background: The Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA checklist is used worldwide to drive quality improvement in laboratories in developing countries and to assess the effectiveness of interventions such as the Strengthening Laboratory Management Toward Accreditation (SLMTA programme. However, the paperbased format of the checklist makes administration cumbersome and limits timely analysis and communication of results. Development of e-Tool: In early 2012, the SLMTA team in Vietnam developed an electronic SLIPTA checklist tool. The e-Tool was pilot tested in Vietnam in mid-2012 and revised. It was used during SLMTA implementation in Vietnam and Cambodia in 2012 and 2013 and further revised based on auditors’ feedback about usability. Outcomes: The SLIPTA e-Tool enabled rapid turn-around of audit results, reduced workload and language barriers and facilitated analysis of national results. Benefits of the e-Tool will be magnified with in-country scale-up of laboratory quality improvement efforts and potential expansion to other countries.

  20. Sandia National Laboratories, Tonopah Test Range Fire Control Bunker (Building 09-51): Photographs and Written Historical and Descriptive Data

    Energy Technology Data Exchange (ETDEWEB)

    Ullrich, Rebecca A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Corporate Archives and History Program

    2017-08-01

    The Fire Control Bunker (Building 09-51) is a contributing element to the Sandia National Laboratories (SNL) Tonopah Test Range (TTR) Historic District. The SNL TTR Historic District played a significant role in U.S. Cold War history in the areas of stockpile surveillance and non-nuclear field testing of nuclear weapons design. The district covers approximately 179,200 acres and illustrates Cold War development testing of nuclear weapons components and systems. This report includes historical information, architectural information, sources of information, project information, maps, blueprints, and photographs.

  1. Using Self-Reflection To Increase Science Process Skills in the General Chemistry Laboratory

    Science.gov (United States)

    Veal, William R.; Taylor, Dawne; Rogers, Amy L.

    2009-03-01

    Self-reflection is a tool of instruction that has been used in the science classroom. Research has shown great promise in using video as a learning tool in the classroom. However, the integration of self-reflective practice using video in the general chemistry laboratory to help students develop process skills has not been done. Immediate video feedback and direct instruction were employed in a general chemistry laboratory course to improve students' mastery and understanding of basic and advanced process skills. Qualitative results and statistical analysis of quantitative data proved that self-reflection significantly helped students develop basic and advanced process skills, yet did not seem to influence the general understanding of the science content.

  2. The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

    Energy Technology Data Exchange (ETDEWEB)

    Chaloupka, Allan B.; Finn, Kevin P.; Parsons, Duane A. [Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)

    2012-07-01

    When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was

  3. Georgia Public Health Laboratory, Decatur, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    2002-12-01

    This case study was prepared as one in a series for the Laboratories for the 21st Century program, a joint endeavor of the U.S. Environmental Protection Agency and the U.S. Department of Energy's Federal Energy Management Program. The goal of this program is to foster greater energy efficiency in new and retrofit laboratory buildings in both the public and the private sectors. The energy-efficient elements of the laboratory featured in this case study-the Georgia Public Health Laboratory, Decatur, Georgia-include sustainable design features, light-filled interior spaces for daylighting, closely grouped loads (such as freezers), the use of recirculated air in administrative areas, direct digital controls for heating and cooling equipment, sunscreens, and low-emissivity window glazing. These elements, combined with an attractive design and well-lighted work spaces, add up to a building that ranks high in comfort and low in energy use.

  4. Environmental Sustainability and Mold Hygiene in Buildings.

    Science.gov (United States)

    Wu, Haoxiang; Ng, Tsz Wai; Wong, Jonathan Wc; Lai, Ka Man

    2018-04-04

    Environmental sustainability is one of the key issues in building management. In Hong Kong, one of the initiatives is to reduce the operation hours of air-conditioning in buildings to cut down energy consumption. In this study, we reported a mold contamination case in a newly refurbished laboratory, in which the air-conditioner was switched from 24- to 18-h mode after refurbishment. In order to prevent mold recurrence, the air-conditioner was switched back to 24-h mode in the laboratory. During the mold investigation, visible mold patches in the laboratory were searched and then cultured, counted and identified. Building and environmental conditions were recorded, and used to deduce different causes of mold contamination. Eight contaminated sites including a wall, a bench, some metal and plastic surfaces and seven types of molds including two Cladosporium spp., two Aspergillus spp., one Rhizopus sp., one Trichoderma sp., and one Tritirachium sp. were identified. Cladosporium spp. were the most abundant and frequently found molds in the laboratory. The contaminated areas could have one to five different species on them. Based on the mold and environmental conditions, several scenarios causing the mold contamination were deduced, and different mold control measures were discussed to compare them with the current solution of using 24-h air-conditioning to control mold growth. This study highlights the importance of mold hygiene in sustainable building management.

  5. Environmental Sustainability and Mold Hygiene in Buildings

    Directory of Open Access Journals (Sweden)

    Haoxiang Wu

    2018-04-01

    Full Text Available Environmental sustainability is one of the key issues in building management. In Hong Kong, one of the initiatives is to reduce the operation hours of air-conditioning in buildings to cut down energy consumption. In this study, we reported a mold contamination case in a newly refurbished laboratory, in which the air-conditioner was switched from 24- to 18-h mode after refurbishment. In order to prevent mold recurrence, the air-conditioner was switched back to 24-h mode in the laboratory. During the mold investigation, visible mold patches in the laboratory were searched and then cultured, counted and identified. Building and environmental conditions were recorded, and used to deduce different causes of mold contamination. Eight contaminated sites including a wall, a bench, some metal and plastic surfaces and seven types of molds including two Cladosporium spp., two Aspergillus spp., one Rhizopus sp., one Trichoderma sp., and one Tritirachium sp. were identified. Cladosporium spp. were the most abundant and frequently found molds in the laboratory. The contaminated areas could have one to five different species on them. Based on the mold and environmental conditions, several scenarios causing the mold contamination were deduced, and different mold control measures were discussed to compare them with the current solution of using 24-h air-conditioning to control mold growth. This study highlights the importance of mold hygiene in sustainable building management.

  6. Decontamination and decommission of a radiochemical laboratory building complex

    International Nuclear Information System (INIS)

    Zoubek, Norbert

    2008-01-01

    Full text: Handling of unsealed radioactive substances for research and development purposes in chemical or pharmaceutical industries or research centres as well as production of radioactive substances (e.g. for applications in nuclear medicine or industry) requires operation of special radiochemical laboratories. In general, operation of radiochemical laboratories is strongly regulated by the government and national authorities. The operator needs a permit related to radiological protection. In general, technical requirements for such facilities are very high. To ensure high safety standards with respect to the employees and the environment, several radiological protection measures have to be taken. These measures (for example special shielding or ventilation and waste water systems) depend on various factors, e.g. activity in use, kind of nuclides, chemical properties and volatility of substances. In order to close-down such radiochemical laboratories some radiological protection measures have to be maintained to ensure protection of both humans and the environment induced by possible residual contaminations within the facility including technical inventory. However, a later reuse of the facility as a non-radioactive facility requires removal of all radioactive contamination with respect to national regulation. Resulting radioactive wastes have to be disposed of under control of competent authorities. Based on the experience of a decontamination and decommission project for a former radiochemical laboratory complex, the main steps necessary to release such a facility are discussed. Analytical aspects of initial conditions, necessary organisational structures within the project, resources needed estimation and exploration of the radiological situation in the laboratory, elaboration of a measuring strategy and decontamination methods as well as different waste disposal routes in relation to different waste types are reported. (author)

  7. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  8. Launching a Laboratory Testing Process Quality Improvement Toolkit: From the Shared Networks of Colorado Ambulatory Practices and Partners (SNOCAP).

    Science.gov (United States)

    Fernald, Douglas; Hamer, Mika; James, Kathy; Tutt, Brandon; West, David

    2015-01-01

    Family medicine and internal medicine physicians order diagnostic laboratory tests for nearly one-third of patient encounters in an average week, yet among medical errors in primary care, an estimated 15% to 54% are attributed to laboratory testing processes. From a practice improvement perspective, we (1) describe the need for laboratory testing process quality improvements from the perspective of primary care practices, and (2) describe the approaches and resources needed to implement laboratory testing process quality improvements in practice. We applied practice observations, process mapping, and interviews with primary care practices in the Shared Networks of Colorado Ambulatory Practices and Partners (SNOCAP)-affiliated practice-based research networks that field-tested in 2013 a laboratory testing process improvement toolkit. From the data collected in each of the 22 participating practices, common testing quality issues included, but were not limited to, 3 main testing process steps: laboratory test preparation, test tracking, and patient notification. Three overarching qualitative themes emerged: practices readily acknowledge multiple laboratory testing process problems; practices know that they need help addressing the issues; and practices face challenges with finding patient-centered solutions compatible with practice priorities and available resources. While practices were able to get started with guidance and a toolkit to improve laboratory testing processes, most did not seem able to achieve their quality improvement aims unassisted. Providing specific guidance tools with practice facilitation or other rapid-cycle quality improvement support may be an effective approach to improve common laboratory testing issues in primary care. © Copyright 2015 by the American Board of Family Medicine.

  9. Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois

    International Nuclear Information System (INIS)

    W. C. Adams

    2007-01-01

    Oak Ridge Institute for Science and Education (ORISE) conducted independent verification radiological survey activities at Argonne National Laboratory's Building 315, Zero Power Reactor-6 facility in Argonne, Illinois. Independent verification survey activities included document and data reviews, alpha plus beta and gamma surface scans, alpha and beta surface activity measurements, and instrumentation comparisons. An interim letter report and a draft report, documenting the verification survey findings, were submitted to the DOE on November 8, 2006 and February 22, 2007, respectively (ORISE 2006b and 2007). Argonne National Laboratory-East (ANL-E) is owned by the U.S. Department of Energy (DOE) and is operated under a contract with the University of Chicago. Fundamental and applied research in the physical, biomedical, and environmental sciences are conducted at ANL-E and the laboratory serves as a major center of energy research and development. Building 315, which was completed in 1962, contained two cells, Cells 5 and 4, for holding Zero Power Reactor (ZPR)-6 and ZPR-9, respectively. These reactors were built to increase the knowledge and understanding of fast reactor technology. ZPR-6 was also referred to as the Fast Critical Facility and focused on fast reactor studies for civilian power production. ZPR-9 was used for nuclear rocket and fast reactor studies. In 1967, the reactors were converted for plutonium use. The reactors operated from the mid-1960's until 1982 when they were both shut down. Low levels of radioactivity were expected to be present due to the operating power levels of the ZPR's being restricted to well below 1,000 watts. To evaluate the presence of radiological contamination, DOE characterized the ZPRs in 2001. Currently, the Melt Attack and Coolability Experiments (MACE) and Melt Coolability and Concrete Interaction (MCCI) Experiments are being conducted in Cell 4 where the ZPR-9 is located (ANL 2002 and 2006). ANL has performed final

  10. Next Steps on the Road to Zero Energy Buildings: Report on October 23-24, 2000 Meeting Held at the National Renewable Energy Laboratory, Golden, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Comer, Jerry [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2000-11-01

    This report summarizes a 2-day meeting held October 23-24, 2000 at the National Renewable Energy Laboratory in Golden, Colorado. Approximately 60 individuals attended the meeting from the following segments: building industry; solar thermal manufacturers (solar hot water, SHW); photovoltaic manufacturers (PV); generalists (consultants and interested parties involved in renewable energy); National Renewable Energy Laboratory (NREL) and Sandia National Laboratory (SNL); and US Department of Energy. The objectives of the meeting included: acquaint attendees with the Zero Energy Buildings (ZEB) goal; determine the most cost effective methods of incorporating solar technologies in production-built homes; identify 'make or break' areas to focus on; outline 6 month, 1 year, 5 year strategies and tactics; and create action plan with designated responsibilities. The format of the meeting was designed to maximize interaction between all attendees and to create a 'working' environment where a roadmap and action plans to support ZEB efforts would be created. Presentations the morning of the first day set the context for the discussions and breakout sessions that followed. The agenda was modified at the end of the first day of meetings to reflect the input of attendees. The revised agenda is included in the Appendix.

  11. Small- and Medium-Sized Commercial Building Monitoring and Controls Needs: A Scoping Study

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Underhill, Ronald M.; Goddard, James K.; Taasevigen, Danny J.; Piette, M. A.; Granderson, J.; Brown, Rich E.; Lanzisera, Steven M.; Kuruganti, T.

    2012-10-31

    Buildings consume over 40% of the total energy consumption in the U.S. A significant portion of the energy consumed in buildings is wasted because of the lack of controls or the inability to use existing building automation systems (BASs) properly. Much of the waste occurs because of our inability to manage and controls buildings efficiently. Over 90% of the buildings are either small-size (<5,000 sf) or medium-size (between 5,000 sf and 50,000 sf); these buildings currently do not use BASs to monitor and control their building systems from a central location. According to Commercial Building Energy Consumption Survey (CBECS), about 10% of the buildings in the U.S. use BASs or central controls to manage their building system operations. Buildings that use BASs are typically large (>100,000 sf). Lawrence Berkeley National Laboratory (LBNL), Oak Ridge National Laboratory (ORNL) and Pacific Northwest National Laboratory (PNNL) were asked by the U.S. Department of Energy’s (DOE’s) Building Technologies Program (BTP) to identify monitoring and control needs for small- and medium-sized commercial buildings and recommend possible solutions. This study documents the needs and solutions for small- and medium-sized buildings.

  12. Determination of the radioactive material and plutonium holdup in ducts and piping in the 325 Building

    International Nuclear Information System (INIS)

    Haggard, D.L.; Tanner, J.E.; Tomeraasen, P.L.

    1996-08-01

    This report describes the measurements performed to determine the radionuclide content and mass of Pu in exposed ducts, filters, and piping in the 325 Building at the Hanford Site. This information is needed to characterize facility radiation levels, to verify compliance with criticality safety specifications, and to allow more accurate nuclear material control using nondestructive assay. Gamma assay was used to determine the gamma-emitting isotopes in ducts, filters, and piping. Passive neutron counting was used to estimate the Pu content. A high-purity Ge detector and a neutron slab detector containing 5 3 He proportional counters were used. Almost all the gamma activity is from 137 Cs and 60 Co. Estimated Pu mass gram equivalents in the basement ductwork and filters are 31 g; the radioactive liquid waste system (RLWS) line has 12 g; the laboratory vacuum system has 2 g equiv. Pu; the retention process sewer has 3 g. Total Pu mass holdup for basement areas range from 48 to 27 g. Estimated Pu mass gram equivalents for all laboratories range from 385 to 581 g. Individual laboratory estimates are tabulated. Total estimated Pu gram equivalent holdup and material in process for the facility is 410 g. In summary, results indicate that no significant Pu levels, from a criticality safety perspective, reside in the ductwork, laboratory vacuum system lines, RLWS pipes, or any one laboratory in the 325 Building

  13. Testing a Constrained MPC Controller in a Process Control Laboratory

    Science.gov (United States)

    Ricardez-Sandoval, Luis A.; Blankespoor, Wesley; Budman, Hector M.

    2010-01-01

    This paper describes an experiment performed by the fourth year chemical engineering students in the process control laboratory at the University of Waterloo. The objective of this experiment is to test the capabilities of a constrained Model Predictive Controller (MPC) to control the operation of a Double Pipe Heat Exchanger (DPHE) in real time.…

  14. Auditable safety analysis: High Radiation Level Chemical Development Facility (Buildings 4507 and 4556), Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Platfoot, J.H.

    1998-07-01

    The High-Radiation-Level Chemical Development Facility includes Buildings 4507 and 4556. Building 4507, located immediately to the west of Building 4500N and to the south of Building 4505, is a doubly contained three-level structure constructed in 1957. The most recent use of the facility was for recovery of multi-gram quantities of 244 Cm during the early 1970s and for Liquid Metal Fast Breeder Reactor (LMFBR) fuel studies in the late 1970s. It has remained in safe standby since 1980. Building 4556 is a below-grade filter pit located to the southwest of Building 4507 and was constructed in 1972. Ventilation from the cells in Building 4507 is passed through high-efficiency particulate air (HEPA) filtration in this building prior to being exhausted to the Building 3039 stack system. This building remains in operation to support ventilation requirements for Building 4507. This Auditable Safety Analysis (ASA) was developed in accordance with the requirements in Energy Systems Program Description FS-103PD, Safety Documentation, Revision 1. This ASA identifies and screens all hazards associated with Buildings 4507 and 4556. The only hazard not screened out and requiring further analysis following the initial screening process is radioactive material in the form of surface contamination. The results of this ASA indicate that the hazards associated with Buildings 4507 and 4556 do not pose a significant threat to workers, the public, or the environment

  15. Removal design report for the 108-F Biological Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Most of the 100-F facilities were deactivated with the reactor and have since been demolished. Of the dozen or so reactor-related structures, only the 105-F Reactor Building and the 108-F Biology Laboratory remain standing today. The 108-F Biology Laboratory was intended to be used as a facility for the mixing and addition of chemicals used in the treatment of the reactor cooling water. Shortly after F Reactor began operation, it was determined that the facility was not needed for this purpose. In 1949, the building was converted for use as a biological laboratory. In 1962, the lab was expanded by adding a three-story annex to the original four-story structure. The resulting lab had a floor area of approximately 2,883 m{sup 2} (main building and annex) that operated until 1973. The building contained 47 laboratories, a number of small offices, a conference room, administrative section, lunch and locker rooms, and a heavily shielded, high-energy exposure cell. The purpose of this removal design report is to establish the methods of decontamination and decommissioning and the supporting functions associated with facility removal and disposal.

  16. Removal design report for the 108-F Biological Laboratory

    International Nuclear Information System (INIS)

    1997-09-01

    Most of the 100-F facilities were deactivated with the reactor and have since been demolished. Of the dozen or so reactor-related structures, only the 105-F Reactor Building and the 108-F Biology Laboratory remain standing today. The 108-F Biology Laboratory was intended to be used as a facility for the mixing and addition of chemicals used in the treatment of the reactor cooling water. Shortly after F Reactor began operation, it was determined that the facility was not needed for this purpose. In 1949, the building was converted for use as a biological laboratory. In 1962, the lab was expanded by adding a three-story annex to the original four-story structure. The resulting lab had a floor area of approximately 2,883 m 2 (main building and annex) that operated until 1973. The building contained 47 laboratories, a number of small offices, a conference room, administrative section, lunch and locker rooms, and a heavily shielded, high-energy exposure cell. The purpose of this removal design report is to establish the methods of decontamination and decommissioning and the supporting functions associated with facility removal and disposal

  17. Pacific Northwest Laboratory facilities radionuclide inventory assessment CY 1992-1993

    International Nuclear Information System (INIS)

    Sula, M.J.; Jette, S.J.

    1994-09-01

    Assessments for evaluating compliance with airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAPs - U.S. Code of Federal Regulations, Title 40 Part 61, Subparts H and I) were performed for 33 buildings at the U.S. Department of Energy's (DOE) Pacific Northwest Laboratory on the Hanford Site, and for five buildings owned and operated by Battelle, Pacific Northwest Laboratories in Richland, Washington. The assessments were performed using building radionuclide inventory data obtained in 1992 and 1993. Results of the assessments are summarized in Table S.1 for DOE-PNL buildings and in Table S.2 for Battelle-owned buildings. Based on the radionuclide inventory assessments, four DOE-PNL buildings (one with two emission points) require continuous sampling for radionuclides per 40 CFR 61. None of the Battelle-owned buildings require continuous emission sampling

  18. Waste management study: Process development at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1984-12-01

    This report presents the results of an evaluation of the present Toxic Waste Control Operations at the Lawrence Livermore National Laboratory, evaluates the technologies most applicable to the treatment of toxic and hazardous wastes and presents conceptual designs of processes for the installation of a new decontamination and waste treatment facility (DWTF) for future treatment of these wastes

  19. Building 2000

    International Nuclear Information System (INIS)

    Den Ouden, C.; Steemers, T.C.

    1992-01-01

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  20. Building 2000

    Energy Technology Data Exchange (ETDEWEB)

    Den Ouden, C [EGM Engineering BV, Dordrecht (Netherlands); Steemers, T C [Commission of the European Communities, Brussels (Belgium)

    1992-01-01

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues.

  1. Implementing a lessons learned process at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Fosshage, Erik D.; Drewien, Celeste A.; Eras, Kenneth; Hartwig, Ronald Craig; Post, Debra S.; Stoecker, Nora Kathleen

    2016-01-01

    The Lessons Learned Process Improvement Team was tasked to gain an understanding of the existing lessons learned environment within the major programs at Sandia National Laboratories, identify opportunities for improvement in that environment as compared to desired attributes, propose alternative implementations to address existing inefficiencies, perform qualitative evaluations of alternative implementations, and recommend one or more near-term activities for prototyping and/or implementation. This report documents the work and findings of the team.

  2. Design of metrology laboratory and microfab center against vibration from shakers laboratory of the new Hong Kong University of Science and Technology

    Science.gov (United States)

    Hong, Westwood K. W.; Boulter, Nicholas

    1992-02-01

    The design of vibration-sensitive laboratories normally requires the protection of these areas from incoming vibration generated by plant, road traffic and footfall impacts. The compact nature of the new HKUST campus requires a more exact design than one would find for a spacious campus with laboratory buildings nicely separated. The HKUST user required a centralized laboratory service with easy access to the major testing facilities. This resulted in the location of vibration sensitive areas (micro-fabrication center and metrology laboratory) close to a Structural Laboratory housing large shakers. These were to be used for seismic and modal testing of structural elements and prototypes. The design of the support structure for the shakers, known as the reaction floor, was critical to the success of the building. Particular attention was paid to the design and construction of the foundations for the reaction floor. For controlling the vibration generated by 10-ton-force rated shakers, a massive structure with caisson supports was designed for the reaction floor and reaction wall. Finite element models were employed to calculate the response of the laboratory floors located above the reaction floor in other parts of the building. The metrology laboratory structure and the foundation design of the reaction floor and a wafer fab built in the U.K. will be presented.

  3. High-performance laboratories and cleanrooms; TOPICAL

    International Nuclear Information System (INIS)

    Tschudi, William; Sartor, Dale; Mills, Evan; Xu, Tengfang

    2002-01-01

    The California Energy Commission sponsored this roadmap to guide energy efficiency research and deployment for high performance cleanrooms and laboratories. Industries and institutions utilizing these building types (termed high-tech buildings) have played an important part in the vitality of the California economy. This roadmap's key objective to present a multi-year agenda to prioritize and coordinate research efforts. It also addresses delivery mechanisms to get the research products into the market. Because of the importance to the California economy, it is appropriate and important for California to take the lead in assessing the energy efficiency research needs, opportunities, and priorities for this market. In addition to the importance to California's economy, energy demand for this market segment is large and growing (estimated at 9400 GWH for 1996, Mills et al. 1996). With their 24hr. continuous operation, high tech facilities are a major contributor to the peak electrical demand. Laboratories and cleanrooms constitute the high tech building market, and although each building type has its unique features, they are similar in that they are extremely energy intensive, involve special environmental considerations, have very high ventilation requirements, and are subject to regulations-primarily safety driven-that tend to have adverse energy implications. High-tech buildings have largely been overlooked in past energy efficiency research. Many industries and institutions utilize laboratories and cleanrooms. As illustrated, there are many industries operating cleanrooms in California. These include semiconductor manufacturing, semiconductor suppliers, pharmaceutical, biotechnology, disk drive manufacturing, flat panel displays, automotive, aerospace, food, hospitals, medical devices, universities, and federal research facilities

  4. Cost challenges for laboratory medicine automation in Africa

    Directory of Open Access Journals (Sweden)

    Donald Moshen Tanyanyiwa

    2010-09-01

    Full Text Available Automation in laboratory medicine is inevitable and the only way forward especially in Africa where the staff turnover is high due to migration of experienced staff to Europe and America. Described here are the common issues that laboratory Managers and Directors encounter when upgrading, replacing analytical systems as well as daily running of diagnostic laboratories. The rapid advancement driven by the first world where research facilities, resources and expertise are available has seen changes in the both the hardware and software utilised by analyzers every two to three years. The downside is that in the process of replacing/phasing out old analysers, the first world countries in some cases donate them to second and third world countries as refurbished analysers. Problems in obtaining spares ensue since the production of new analysers results in reduced production or even of old spares. Unavailability or delayed availability of spares results in suspension of diagnostic service by the recipient laboratory. In some areas costly modifications to the analysers or the location/building have had to done to suite local (African conditions, hence the need for Laboratory managers to understand fully the analysers’ operational requirements before purchasing or accepting donations

  5. Improving the Green Building Evaluation System in China Based on the DANP Method

    Directory of Open Access Journals (Sweden)

    Qi-Gan Shao

    2018-04-01

    Full Text Available Against the background of sustainable development, green building practices could be part of the strategy for solving environmental and energy problems in developing countries. The aim of this paper is to explore a system for the assessment of green buildings in China that provides the government and stakeholders with ways to improve their strategies for green building development. We apply a hybrid model, developed by integrating the Decision-Making Trial and Evaluation Laboratory and Analytical Network Process (called DANP method, to build an influential network relationship map (INRM between assessment systems and to derive the criterion weights. The INRM and derived weights can help us to understand this complex assessment system and to set improvement priorities for green building development. The results demonstrate that indoor environment, materials, and smart facilities are the top three critical factors for green building evaluation. Finally, we discuss some management implications based on an actual case study with solutions provided using this model.

  6. Preparing a laboratory for radioanalytical emergency response

    International Nuclear Information System (INIS)

    Bennett, J.; Webb, C.J.; Isch, S.

    2011-01-01

    As the state of the nation's ability to respond to a radiological event is examined, it has become apparent that both capacity and capability are lacking. Department of Homeland Security National Planning Scenario 11 is designed to address the planning activities for the response to an attack using radiological dispersal devices. The scenario details show that the cleanup activity will take several years, and that there will be between 360 000 and 1 000 000 environmental samples in the first year. Based on existing capacity and capabilities it would take four to six years to analyze the samples generated at the lower end of the sample range. The Environmental Protection Agency (EPA) has been given responsibility for the remediation activities following a radiological event, and has awarded cooperative agreements to several laboratories to start the process of developing capacity and capabilities. The Connecticut Department of Public Health Laboratory (DPHL) was awarded one of the cooperative agreements. The DPHL has started activities to further those goals by investigating and implementing procedures to ensure that samples with activity higher than normal background can be processed safely, as well as implementing more rapid methods for radiochemical analysis. The DPHL already served as the primacy radiochemistry laboratory for several New England states and thus had a solid foundation to build upon. The DPHL has taken a process flow approach in preparing for radiological emergency response and recommends that radioanalytical laboratories that are reviewing their roles in such a response: - Ensure that their Nuclear Regulatory Commission licenses allow for appropriate radioisotope types and activities; - Develop procedures and processes to ensure that samples with higher activities can be processed safely, with due regard for sample screening and aliquanting samples; - Provide for enhanced radioanalytical contamination control, with careful consideration of sample

  7. Characterization and Processing Behavior of Heated Aluminum-Polycarbonate Composite Build Plates for the FDM Additive Manufacturing Process

    Directory of Open Access Journals (Sweden)

    Sherri L. Messimer

    2018-02-01

    Full Text Available One of the most essential components of the fused deposition modeling (FDM additive manufacturing (AM process is the build plate, the surface upon which the part is constructed. These are typically made from aluminum or glass, but there are clear disadvantages to both and restrictions on which materials can be processed on them successfully. This study examined the suitability of heated aluminum-polycarbonate (AL-PC composite print beds for FDM, looking particularly at the mechanical properties, thermal behavior, deformation behavior, bonding strength with deposited material, printing quality, and range of material usability. Theoretical examination and physical experiments were performed for each of these areas; the results were compared to similar experiments done using heated aluminum and aluminum-glass print beds. Ten distinct materials (ABS, PLA, PET, HIPS, PC, TPU, PVA, nylon, metal PLA, and carbon-fiber PLA were tested for printing performance. The use of a heated AL-PC print bed was found to be a practical option for most of the materials, particularly ABS and TPU, which are often challenging to process using traditional print bed types. Generally, the results were found to be equivalent to or superior to tempered glass and superior to standard aluminum build plates in terms of printing capability.

  8. Melt processed high-temperature superconductors

    CERN Document Server

    1993-01-01

    The achievement of large critical currents is critical to the applications of high-temperature superconductors. Recent developments have shown that melt processing is suitable for producing high J c oxide superconductors. Using magnetic forces between such high J c oxide superconductors and magnets, a person could be levitated.This book has grown largely out of research works on melt processing of high-temperature superconductors conducted at ISTEC Superconductivity Research Laboratory. The chapters build on melt processing, microstructural characterization, fundamentals of flux pinning, criti

  9. Ventilation measurements as an adjunct to radon measurements in buildings

    International Nuclear Information System (INIS)

    Knutson, E.O.; Franklin, H.

    1977-01-01

    The concentration of radon in a building is a function of the radon sources within the building and of the building's ventilation characteristics. To complement its radon measurement program, HASL is currently assessing apparatus and procedures for measuring building ventilation. Results are reported from ventilation measurements made in the laboratory and in a residential building

  10. Building Magnets at Brookhaven National Laboratory - An Account

    Energy Technology Data Exchange (ETDEWEB)

    Willen, E. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-02-01

    The development of superconducting wire and cable in the late 20th century enabled high field magnets and thus much higher beam collision energies in accelerators. These higher collision energies have allowed experiments to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are what these experiments seek to investigate. The subject has aroused the curiosity of not only scientists but of the public as well and has facilitated the support needed to build and operate such expensive machines and experiments. The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, with success and failure in uneven measure along the way. It is also a story of administrative imperatives that have had unpredictable effects on a project’s success, depending mostly on the people in the administrative roles and the decisions that they have made.

  11. Pre Incident Planning For The Los Alamos National Laboratory

    Science.gov (United States)

    2017-12-01

    laboratory was asked to design and build the world’s first atomic bomb . The Los Alamos Fire Department (LAFD) provides emergency response services to...Project: the newly established laboratory was asked to design and build the world’s first atomic bomb . The Los Alamos Fire Department (LAFD) provides...lower priority despite its importance to the responders’ scene safety.20 In a Carolina Fire Rescue EMS Journal article, retired New York City

  12. Electric Propulsion Research Building (EPRB)

    Data.gov (United States)

    Federal Laboratory Consortium — The Electric Propulsion Research Building (EPRB) capability centers on its suite of vacuum chambers, which are configured to meet the unique requirements related to...

  13. The Cost of Enforcing Building Energy Codes: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Alison [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Price, Sarah K. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vine, Ed [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-15

    The purpose of this study is to present key findings regarding costs associated with enforcing building energy code compliance–primarily focusing on costs borne by local government. Building codes, if complied with, have the ability to save a significant amount of energy. However, energy code compliance rates have been significantly lower than 100%. Renewed interest in building energy codes has focused efforts on increasing compliance, particularly as a result of the 2009 American Recovery and Reinvestment Act (ARRA) requirement that in order for states to receive additional energy grants, they must have “a plan for the jurisdiction achieving compliance with the building energy code…in at least 90 percent of new and renovated residential and commercial building space” by 2017 (Public Law 111-5, Section 410(2)(C)). One study by the Institute for Market Transformation (IMT) estimated the costs associated with reaching 90% compliance to be $810 million, or $610 million in additional funding over existing expenditures, a non-trivial value. [Majersik & Stellberg 2010] In this context, Lawrence Berkeley National Laboratory (LBNL) conducted a study to better pinpoint the costs of enforcement through a two-phase process.

  14. Lawrence and his laboratory

    International Nuclear Information System (INIS)

    Hellbron, J.L.; Seidel, R.W.

    1989-01-01

    The birthplace of nuclear chemistry and nuclear medicine is the subject of this study of the Radiation Laboratory in Berkeley, California, where Ernest Lawrence used local and national technological, economic, and manpower resources to build the cyclotron

  15. Implementing an integrated standards-based management system to ensure compliance at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Hjeresen, D.; Roybal, S.; Bertino, P.; Gherman, C.; Hosteny, B.

    1995-01-01

    Los Alamos National Laboratory (LANL or the Laboratory) is developing and implementing a comprehensive, Integrated Standards-Based Management System (ISBMS) to enhance environmental, safety, and health (ESH) compliance efforts and streamline management of ESH throughout the Laboratory. The Laboratory recognizes that to be competitive in today's business environment and attractive to potential Partnerships, Laboratory operations must be efficient and cost-effective. The Laboratory also realizes potential growth opportunities for developing ESH as a strength in providing new or improved services to its customers. Overall, the Laboratory desires to establish and build upon an ESH management system which ensures continuous improvement in protecting public health and safety and the environment and which fosters a working relationship with stakeholders. A team of process experts from the LANL Environmental Management (EM) Program Office, worked with management system consultants, and the Department of Energy (DOE) to develop an ESH management systems process to compare current LANL ESH management Systems and programs against leading industry standards. The process enabled the Laboratory to gauge its performance in each of the following areas: Planning and Policy Setting; Systems and Procedures; Implementation and Education; and Monitoring and Reporting. The information gathered on ESH management systems enabled LANL to pinpoint and prioritize opportunities for improvement in the provision of ESH services throughout the Laboratory and ultimately overall ESH compliance

  16. Laboratory Study of Polychlorinated Biphenyl (PCB) Contamination and Mitigation in Buildings -- Part 4. Evaluation of the Activated Metal Treatment System (AMTS) for On-site Destruction of PCBs

    Science.gov (United States)

    This is the fourth, also the last, report of the report series entitled “Laboratory Study of Polychlorinated Biphenyl (PCB) Contamination and Mitigation in Buildings.” This report evaluates the performance of an on-site PCB destruction method, known as the AMTS method, developed ...

  17. EvoBuild: A Quickstart Toolkit for Programming Agent-Based Models of Evolutionary Processes

    Science.gov (United States)

    Wagh, Aditi; Wilensky, Uri

    2018-04-01

    Extensive research has shown that one of the benefits of programming to learn about scientific phenomena is that it facilitates learning about mechanisms underlying the phenomenon. However, using programming activities in classrooms is associated with costs such as requiring additional time to learn to program or students needing prior experience with programming. This paper presents a class of programming environments that we call quickstart: Environments with a negligible threshold for entry into programming and a modest ceiling. We posit that such environments can provide benefits of programming for learning without incurring associated costs for novice programmers. To make this claim, we present a design-based research study conducted to compare programming models of evolutionary processes with a quickstart toolkit with exploring pre-built models of the same processes. The study was conducted in six seventh grade science classes in two schools. Students in the programming condition used EvoBuild, a quickstart toolkit for programming agent-based models of evolutionary processes, to build their NetLogo models. Students in the exploration condition used pre-built NetLogo models. We demonstrate that although students came from a range of academic backgrounds without prior programming experience, and all students spent the same number of class periods on the activities including the time students took to learn programming in this environment, EvoBuild students showed greater learning about evolutionary mechanisms. We discuss the implications of this work for design research on programming environments in K-12 science education.

  18. Armstrong's Building 703 in Palmdale

    Data.gov (United States)

    Federal Laboratory Consortium — NASA Armstrong Flight Research Center's (AFRC) Building 703 is located in Palmdale, Calif., 70 miles northeast of downtown Los Angeles. NASA has leased the facility,...

  19. Experimental study of a laboratory concrete material representative of containment buildings: desorption isotherms and permeability determination

    International Nuclear Information System (INIS)

    Semete, P.; Fevrier, B.; Delorme, J.; Sanahuja, J.; Desgree, P.; Le Pape, Y.

    2015-01-01

    The isotherm sorption curve is a first order parameter for the calculations of concrete drying and/or creep using Finite Element Analysis. An experimental campaign was undertaken by EDF MMC in order to characterize the first desorption isotherm at room temperature of a laboratory material representative of concrete containment buildings. Long term drying tests were carried out on cement paste and on three samples geometries on concrete (with radial and axial one-dimensional drying on thin disks and multi-dimensional drying on Representative Elementary Volumes). The measurements results (porosity, densities and mass loss curves) are provided and the isotherms obtained for the four different configurations are compared. Several analyses of the results are proposed including the assessment of a criterion for the determination of the moisture content final balance (estimation of the asymptotic mass loss) and the back-analysis of equivalent permeability. (authors)

  20. INL High Performance Building Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer D. Morton

    2010-02-01

    High performance buildings, also known as sustainable buildings and green buildings, are resource efficient structures that minimize the impact on the environment by using less energy and water, reduce solid waste and pollutants, and limit the depletion of natural resources while also providing a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish this mission. This infrastructure, particularly the buildings, should incorporate high performance sustainable design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. Additionally, INL is a large consumer of energy that contributes to both carbon emissions and resource inefficiency. In the current climate of rising energy prices and political pressure for carbon reduction, this guide will help new construction project teams to design facilities that are sustainable and reduce energy costs, thereby reducing carbon emissions. With these concerns in mind, the recommendations described in the INL High Performance Building Strategy (previously called the INL Green Building Strategy) are intended to form the INL foundation for high performance building standards. This revised strategy incorporates the latest federal and DOE orders (Executive Order [EO] 13514, “Federal Leadership in Environmental, Energy, and Economic Performance” [2009], EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management” [2007], and DOE Order 430.2B, “Departmental Energy, Renewable Energy, and Transportation Management” [2008]), the latest guidelines, trends, and observations in high performance building construction, and the latest changes to the Leadership in Energy and Environmental Design

  1. Artificial Neural Network Approach in Laboratory Test Reporting:  Learning Algorithms.

    Science.gov (United States)

    Demirci, Ferhat; Akan, Pinar; Kume, Tuncay; Sisman, Ali Riza; Erbayraktar, Zubeyde; Sevinc, Suleyman

    2016-08-01

    In the field of laboratory medicine, minimizing errors and establishing standardization is only possible by predefined processes. The aim of this study was to build an experimental decision algorithm model open to improvement that would efficiently and rapidly evaluate the results of biochemical tests with critical values by evaluating multiple factors concurrently. The experimental model was built by Weka software (Weka, Waikato, New Zealand) based on the artificial neural network method. Data were received from Dokuz Eylül University Central Laboratory. "Training sets" were developed for our experimental model to teach the evaluation criteria. After training the system, "test sets" developed for different conditions were used to statistically assess the validity of the model. After developing the decision algorithm with three iterations of training, no result was verified that was refused by the laboratory specialist. The sensitivity of the model was 91% and specificity was 100%. The estimated κ score was 0.950. This is the first study based on an artificial neural network to build an experimental assessment and decision algorithm model. By integrating our trained algorithm model into a laboratory information system, it may be possible to reduce employees' workload without compromising patient safety. © American Society for Clinical Pathology, 2016. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  2. Floor response spectra of the main process building of a reprocessing plant against earthquake, airplane crash and blast

    International Nuclear Information System (INIS)

    Hilpert, H.J.

    1987-01-01

    In the general concept of the planned reprocessing plant for spent fuel elements, the main process building has the central function. This building will be designed to withstand earthquake, airplane crash and blast. This report deals with the stress on components and systems due to vibration of the building, the floor response spectra

  3. Decontamination and decommissioning of the Argonne National Laboratory Building 350 Plutonium Fabrication Facility. Final report

    International Nuclear Information System (INIS)

    Kline, W.H.; Moe, H.J.; Lahey, T.J.

    1985-02-01

    In 1973, Argonne National Laboratory began consolidating and upgrading its plutonium-handling operations with the result that the research fuel-fabrication facility located in Building 350 was shut down and declared surplus. Sixteen of the twenty-three gloveboxes which comprised the system were disassembled and relocated for reuse or placed into controlled storage during 1974 but, due to funding constraints, full-scale decommissioning did not start until 1978. Since that time the fourteen remaining contaminated gloveboxes, including all internal and external equipment as well as the associated ventilation systems, have been assayed for radioactive content, dismantled, size reduced to fit acceptable packaging and sent to a US Department of Energy (DOE) transuranic retrievable-storage site or to a DOE low-level nuclear waste burial ground. The project which was completed in 1983, required 5 years to accomplish, 32 man years of effort, produced some 540 m 3 (19,000 ft 3 ) of radioactive waste of which 60% was TRU, and cost 2.4 million dollars

  4. Process data in safeguards at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Ehinger, M.H.

    1988-01-01

    The desire to improve timeliness and sensitivity of material control and accounting capabilities is the basis for evaluation and upgrade of regulatory requirements throughout the nuclear industry. Improvements invariably require better measurement capabilities and more frequent measurements. Operating plants typically include a broad range of measurements and equipment devoted to process control. How can these measurements be used to benefit safeguards? A part of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory has focused on the use of process data for safeguards. This report discusses recent safeguards demonstrations and current activities in a test facility at Oak Ridge

  5. Selecting a Control Strategy for Plug and Process Loads

    Energy Technology Data Exchange (ETDEWEB)

    Lobato, C.; Sheppy, M.; Brackney, L.; Pless, S.; Torcellini, P.

    2012-09-01

    Plug and Process Loads (PPLs) are building loads that are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the building occupants. PPLs in commercial buildings account for almost 5% of U.S. primary energy consumption. On an individual building level, they account for approximately 25% of the total electrical load in a minimally code-compliant commercial building, and can exceed 50% in an ultra-high efficiency building such as the National Renewable Energy Laboratory's (NREL) Research Support Facility (RSF) (Lobato et al. 2010). Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. A complex array of technologies that measure and manage PPLs has emerged in the marketplace. Some fall short of manufacturer performance claims, however. NREL has been actively engaged in developing an evaluation and selection process for PPLs control, and is using this process to evaluate a range of technologies for active PPLs management that will cap RSF plug loads. Using a control strategy to match plug load use to users' required job functions is a huge untapped potential for energy savings.

  6. The study of thermal processes in control systems of heat consumption of buildings

    Science.gov (United States)

    Tsynaeva, E.; A, Tsynaeva

    2017-11-01

    The article discusses the main thermal processes in the automated control systems for heat consumption (ACSHC) of buildings, schematic diagrams of these systems, mathematical models used for description of thermal processes in ACSHC. Conducted verification represented by mathematical models. It was found that the efficiency of the operation of ACSHC depend from the external and internal factors. Numerical study of dynamic modes of operation of ACSHC.

  7. Building America Research Benchmark Definition, Updated December 2009

    Energy Technology Data Exchange (ETDEWEB)

    Hendron, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Engebrecht, Cheryn [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2010-01-01

    To track progress toward aggressive multi-year, whole-house energy savings goals of 40%–70% and on-site power production of up to 30%, the U.S. Department of Energy (DOE) Residential Buildings Program and the National Renewable Energy Laboratory (NREL) developed the Building America (BA) Research Benchmark in consultation with the Building America industry teams.

  8. Laboratory safety handbook

    Science.gov (United States)

    Skinner, E.L.; Watterson, C.A.; Chemerys, J.C.

    1983-01-01

    Safety, defined as 'freedom from danger, risk, or injury,' is difficult to achieve in a laboratory environment. Inherent dangers, associated with water analysis and research laboratories where hazardous samples, materials, and equipment are used, must be minimized to protect workers, buildings, and equipment. Managers, supervisors, analysts, and laboratory support personnel each have specific responsibilities to reduce hazards by maintaining a safe work environment. General rules of conduct and safety practices that involve personal protection, laboratory practices, chemical handling, compressed gases handling, use of equipment, and overall security must be practiced by everyone at all levels. Routine and extensive inspections of all laboratories must be made regularly by qualified people. Personnel should be trained thoroughly and repetitively. Special hazards that may involve exposure to carcinogens, cryogenics, or radiation must be given special attention, and specific rules and operational procedures must be established to deal with them. Safety data, reference materials, and texts must be kept available if prudent safety is to be practiced and accidents prevented or minimized.

  9. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A - Quality assurance plan; Appendix B - Records management plan

    International Nuclear Information System (INIS)

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included

  10. Decontamination of concrete surfaces in Building 3019, Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Parrott, J.R. Sr.

    1980-01-01

    This building was built in 1943 to serve as a pilot plant for separating isotopes from irradiated fuels. A chemical explosion leading to widespread Pu contamination occurred on Nov. 20, 1959, and the steps taken to treat the building afterwards are discussed, in particular the floor and the cells. The experience shows how hard it is to decontaminate concrete; smooth coatings should be utilized

  11. Laboratory and Feasibility Study for Industrial Wastewater Effluents Treatment by Radiation

    Energy Technology Data Exchange (ETDEWEB)

    Zimek, Z.; Głuszewski, W. [Centre for Radiation Research and Technology, Institute of Nuclear Chemistry and Technology, Warsaw (Poland)

    2012-07-01

    The study of wastewater treatment by radiation regarding chemical processes contribution and physical-chemical separation of highly concentrated non-organic pollutants deposited in specific industrial waste are proposed. Laboratory stand should be build and the study should be performed to confirm possible mechanism of the sedimentation process of nonorganic pollutants during separation initiated by ionizing radiation. Evaluation from technical and economical point of view of this specific radiation technology and feasibility study preparation for industrial facility will be the main output at the final stage of the project. (author)

  12. Laboratory and Feasibility Study for Industrial Wastewater Effluents Treatment by Radiation

    International Nuclear Information System (INIS)

    Zimek, Z.; Głuszewski, W.

    2012-01-01

    The study of wastewater treatment by radiation regarding chemical processes contribution and physical-chemical separation of highly concentrated non-organic pollutants deposited in specific industrial waste are proposed. Laboratory stand should be build and the study should be performed to confirm possible mechanism of the sedimentation process of nonorganic pollutants during separation initiated by ionizing radiation. Evaluation from technical and economical point of view of this specific radiation technology and feasibility study preparation for industrial facility will be the main output at the final stage of the project. (author)

  13. Building local human resources to implement SLMTA with limited donor funding: The Ghana experience.

    Science.gov (United States)

    Nkrumah, Bernard; van der Puije, Beatrice; Bekoe, Veronica; Adukpo, Rowland; Kotey, Nii A; Yao, Katy; Fonjungo, Peter N; Luman, Elizabeth T; Duh, Samuel; Njukeng, Patrick A; Addo, Nii A; Khan, Fazle N; Woodfill, Celia J I

    2014-11-03

    In 2009, Ghana adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme in order to improve laboratory quality. The programme was implemented successfully with limited donor funding and local human resources. To demonstrate how Ghana, which received very limited PEPFAR funding, was able to achieve marked quality improvement using local human resources. Local partners led the SLMTA implementation and local mentors were embedded in each laboratory. An in-country training-of-trainers workshop was conducted in order to increase the pool of local SLMTA implementers. Three laboratory cohorts were enrolled in SLMTA in 2011, 2012 and 2013. Participants from each cohort attended in a series of three workshops interspersed with improvement projects and mentorship. Supplemental training on internal audit was provided. Baseline, exit and follow-up audits were conducted using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist. In November 2013, four laboratories underwent official SLIPTA audits by the African Society for Laboratory Medicine (ASLM). The local SLMTA team successfully implemented three cohorts of SLMTA in 15 laboratories. Seven out of the nine laboratories that underwent follow-up audits have reached at least one star. Three out of the four laboratories that underwent official ASLM audits were awarded four stars. Patient satisfaction increased from 25% to 70% and sample rejection rates decreased from 32% to 10%. On average, $40 000 was spent per laboratory to cover mentors' salaries, SLMTA training and improvement project support. Building in-country capacity through local partners is a sustainable model for improving service quality in resource-constrained countries such as Ghana. Such models promote country ownership, capacity building and the use of local human resources for the expansion of SLMTA.

  14. Home and Building Energy Management Systems | Grid Modernization | NREL

    Science.gov (United States)

    Home and Building Energy Management Systems Home and Building Energy Management Systems NREL researchers are developing tools to understand the impact of changes in home and building energy use and how researchers who received a record of invention for a home energy management system in a smart home laboratory

  15. Energy efficiency in California laboratory-type facilities

    Energy Technology Data Exchange (ETDEWEB)

    Mills, E.; Bell, G.; Sartor, D. [and others

    1996-07-31

    The central aim of this project is to provide knowledge and tools for increasing the energy efficiency and performance of new and existing laboratory-type facilities in California. We approach the task along three avenues: (1) identification of current energy use and savings potential, (2) development of a {ital Design guide for energy- Efficient Research Laboratories}, and (3) development of a research agenda for focused technology development and improving out understanding of the market. Laboratory-type facilities use a considerable amount of energy resources. They are also important to the local and state economy, and energy costs are a factor in the overall competitiveness of industries utilizing laboratory-type facilities. Although the potential for energy savings is considerable, improving energy efficiency in laboratory-type facilities is no easy task, and there are many formidable barriers to improving energy efficiency in these specialized facilities. Insufficient motivation for individual stake holders to invest in improving energy efficiency using existing technologies as well as conducting related R&D is indicative of the ``public goods`` nature of the opportunity to achieve energy savings in this sector. Due to demanding environmental control requirements and specialized processes, laboratory-type facilities epitomize the important intersection between energy demands in the buildings sector and the industrial sector. Moreover, given the high importance and value of the activities conducted in laboratory-type facilities, they represent one of the most powerful contexts in which energy efficiency improvements stand to yield abundant non-energy benefits if properly applied.

  16. Nearly Zero Energy Standard for Non-Residential Buildings with high Energy Demands—An Empirical Case Study Using the State-Related Properties of BAVARIA

    Directory of Open Access Journals (Sweden)

    Michael Keltsch

    2017-03-01

    Full Text Available The Energy Performance of Buildings Directive (EPBD 2010 calls for the Nearly Zero Energy Building (nZEB Standard for new buildings from 2021 onwards: Buildings using “almost no energy” are powered by renewable sources or by the energy produced by the building itself. For residential buildings, this ambitious new standard has already been reached. But for other building types, this goal is still far away. The potential of these buildings to meet a nZEB Standard was investigated by analyzing ten case studies, representing non-residential buildings with different uses. The analysis shows that the primary characteristics common to critical building types are a dense building context with a very high degree of technical installation (such as hospital, research, and laboratory buildings. The large primary energy demand of these types of buildings cannot be compensated by building- and property-related energy generation, including off-site renewables. If the future nZEB Standard were to be defined with lower requirements because of this, the state-related properties of Bavaria suggest that the real potential energy savings available in at least 85% of all new buildings would be insufficiently exploited. Therefore, it would be more useful to individualize the legal energy verification process for new buildings, to distinguish critical building types such as laboratories and hospitals from the other building types.

  17. The basic design and requirement for plant tissue culture laboratory in MINT

    International Nuclear Information System (INIS)

    Azraf Azman; Rosli Darmawan; Rusli Ibrahim; Mohd Nazir Basiran; Azhar Mohamad; Mohamed Najli Mohamed Yasin; Shuhaimi Shamsuddin

    2005-01-01

    The production of multiple species plantlets involves a relatively complex process and it is a highly specialized operation. Tissue culture technology is rapidly becoming a commercialized method for propagating new cultivars, rare species and difficult-to-propagate plant. Not only are skills and knowledge essential but the laboratory itself also plays an important role to ensure the successful growth of the plantlets. To produce quality plantlets, plant tissue culture laboratories should fulfill the basic requirements. The laboratory should have proper building and layout which comprise of media preparation and washing room, sterilization or autoclave room, transfer room and culture or growth room. The scope of this paper is to compare these fundamental requirements with the plant tissue culture laboratory in MINT. All the basic needs and differences will be discussed and the proposal for corrective actions will be presented. (Author)

  18. Results of Laboratory Testing of Advanced Power Strips

    Energy Technology Data Exchange (ETDEWEB)

    Earle, L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sparn, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-08-01

    Presented at the ACEEE Summer Study on Energy Efficiency in Buildings on August 12-17, 2012, this presentation reports on laboratory tests of 20 currently available advanced power strip products, which reduce wasteful electricity use of miscellaneous electric loads in buildings.

  19. Post remedial action survey report for Building 003, Santa Susana Field Laboratories, Rockwell International, Ventura County, California, October 1981; April 1982. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-10-01

    Rockwell International's Santa Susana Laboratories in Ventura County, California, have been the site of numerous Federally-funded projects involving the use of radioactive materials. One such project was the System for Nuclear Auxiliary Power (SNAP) Program. Building 003 on the Santa Susana site was used in conjunction with the SNAP Program and contained a highly shielded area designed for remote manipulation of radioactive materials. Such facilities are commonly referred to as hot caves. During the SNAP Program, fuel burnup samples were analyzed and irradiation experiments were evaluated in the Building 003 hot cave. Use of the hot cave facility ended when the SNAP Program was terminated in 1973. Subsequently, the Building 003 facilities were declared excess and were decontaminaed and decommissioned during the first half of calendar year 1975. At that time, the building was given a preliminary release. In 1981, a post-remedial-action (certification) survey of Building 003 was conducted at the request of the Department of Energy. Significant levels of residual contamination were found in various parts of the building. Consequently, additional decontamination was conducted by Rockwell International. A final post-remedial-action survey was conducted during April 1982, and those areas in Building 003 that had been found contaminated in 1981 were now found to be free of detectable radioactive contamination. Sludge samples taken from the sewer sump showed elevated levels of enriched uranium contaminant. Hence, all sewer lines within Building 003 were removed. This permitted unconditional release of the building for unrestricted use. However, the sewer lines exterior to the building, which remain in place, must be considered potentially contaminated and, therefore, subject to restricted use

  20. Building technologies program. 1995 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Selkowitz, S.E.

    1996-05-01

    The 1995 annual report discusses laboratory activities in the Building Technology Program. The report is divided into four categories: windows and daylighting, lighting systems, building energy simulation, and advanced building systems. The objective of the Building Technologies program is to assist the U.S. building industry in achieving substantial reductions in building-sector energy use and associated greenhouse gas emissions while improving comfort, amenity, health, and productivity in the building sector. Past efforts have focused on windows and lighting, and on the simulation tools needed to integrate the full range of energy efficiency solutions into achievable, cost-effective design solutions for new and existing buildings. Current research is based on an integrated systems and life-cycle perspective to create cost-effective solutions for more energy-efficient, comfortable, and productive work and living environments. Sixteen subprograms are described in the report.

  1. NRAO Central Development Laboratory (CDL)

    Data.gov (United States)

    Federal Laboratory Consortium — The mission of the CDL is to support the evolution of NRAO's existing facilities and to provide the technology and expertise needed to build the next generation of...

  2. Building electro-optical systems making it all work

    CERN Document Server

    Hobbs, Philip C D

    2009-01-01

    Praise for the First Edition ""Now a new laboratory bible for optics researchers has joined the list: it is Phil Hobbs's Building Electro-Optical Systems: Making It All Work.""-Tony Siegman, Optics & Photonics News Building a modern electro-optical instrument may be the most interdisciplinary job in all of engineering. Be it a DVD player or a laboratory one-off, it involves physics, electrical engineering, optical engineering, and computer science interacting in complex ways. This book will help all kinds of technical people sort through the complexit

  3. Building 107 for surface treatment

    CERN Multimedia

    Brice, Maximilien

    2018-01-01

    A brand new state-of-the-art building hosting laboratories for the surface treatment of vacuum equipment and workshops for the manufacturing and treatment of printed circuit boards was completed in 2017.

  4. Oak Ridge National Laboratory Melton Valley Storage Tanks Waste Filtration Process Evaluation

    International Nuclear Information System (INIS)

    Walker, B.W.

    1998-01-01

    Cross-flow filtration is being evaluated as a pretreatment in the proposed treatment processes for aqueous high-level radioactive wastes at Oak Ridge National Laboratory (ORNL) to separate insoluble solids from aqueous waste from the Melton Valley Storage Tanks (MVST)

  5. Investigations of radioactivity of building raw and materials

    International Nuclear Information System (INIS)

    Zak, A.; Biernacka, M.; Jagielak, J.; Lipinski, P.

    1993-01-01

    In 1980, Ministry of Building and Building Materials Industry, the Central Laboratory for Radiological Protection (abbreviated as CLRP), Ministry of Health and Social Welfare have agreed to issue the compulsory regulation of performing the validation of investigations of building raw and materials. Methods of measurement, apparatus and method of evaluation of results of the investigations have been recommended for the whole country. The following two criteria of usefulness of a building material for housing and public building have been accepted, f 1 = 0.00027 S K + 0.0027 S Ra0 .0043 S Th ≤ 1 (this one limit exposition of the whole body to gamma radiation); f 2 = S Ra ≤ 185 Bq/kg (this one limits exposition of lung epithelium to progeny of radon 222 Rn exhaled from the building walls). The CLRP and Institute of Building Technology supervise over correctness (agreement with the regulations) of operation of laboratories in Departments of Building Industry and Energy, organize training of the personnel and collect results of the measurements. From 1980 till 1991, results of measurements of 6550 samples from 550 localities were collected in computer data base organized in CLRP. In this paper, results of examination of selected groups of building raw and materials have been presented. Annual average values of the qualification coefficients f 1 and f 2 have been also analyzed. (author). 7 refs, 13 figs, 2 tabs

  6. Design and management of hot-laboratories

    International Nuclear Information System (INIS)

    1976-09-01

    This document is a manual for the design and management of hot-laboratories. It is composed of three parts. The first part is devoted to the design of hot-laboratories. Items included here are; conceptual design; many regulations which must be considered at design stage; design of cave and its shielding; and the design of building, ventilation, and draining. Many examples of specific designs are presented by figures and photographs. The second part is concerned with the methods of operation management. Organizational structure, scheduling of operation, process management, and regulatory problems are discussed with some examples. Technological problems associated with the operation of a hot laboratory (e.g., manipulator, transfer machine, maintenance, and decontamination) are also discussed based on the authors' experiences. An example of the operation manual is presented for reference. The third part is devoted to the safety management and the training of personnel. The regulations by law are briefly explained. Most of this part is devoted to the problem of monitoring radio-activity. Monitoring of control areas, radio-active wastes, and personal dosage is discussed together with many other specific monitoring problems. As for training, the purpose and the present status are explained. (Aoki, K.)

  7. A Framework to Simplify the Creation of Remote Laboratories

    Directory of Open Access Journals (Sweden)

    Isidro Calvo

    2010-05-01

    Full Text Available Building remote laboratories is not a trivial issue since they are complex systems in which a great number of factors (security, QoS, integration of information of different nature, etc. are involved. This complexity requires the use of diverse technologies that complicate the creation of the laboratories. Current work presents a framework to ease the creation of remote laboratories (both real and virtual from a set of reusable blocks that solve most common issues (connection, student management, experiments assessment, etc. so the designers of the experiments may concentrate on their functionality. The followed approach proposes the use of certain technologies widely used in the control engineering community such as Labview and EJS, so the creation of a new laboratory will require the creation of two applications separately that will be integrated within the framework: (1 One Labview application to acquire process information and (2 a Java applet created with EJS used as graphical interface. The proposed framework was used with a water level automatic system to show how to add new experiments to the framework.

  8. Characterization of past and present waste streams from the 325 Radiochemistry Building

    International Nuclear Information System (INIS)

    Pottmeyer, J.A.; Weyns-Rollosson, M.I.; Dicenso, K.D.; DeLorenzo, D.S.; Duncan, D.R.

    1993-12-01

    The purpose of this report is to characterize, as far as possible, the solid waste generated by the 325 Radiochemistry Building since its construction in 1953. Solid waste as defined in this document is any containerized or self-contained material that has been declared waste. This characterization is of particular interest in the planning of transuranic (TRU) waste retrieval operations including the Waste Receiving and Processing (WRAP) Facility. Westinghouse Hanford Company (Westinghouse Hanford) and Battelle Pacific Northwest Laboratory (PNL) activities at Building 325 have generated approximately 4.4% and 2.4%, respectively, of the total volume of TRU waste currently stored at the Hanford Site

  9. How to use Building Information Systems for a transition towards Sustainable Building Operation

    NARCIS (Netherlands)

    Itard, L.C.M.; Joosstens, F; Heiselberg, Per Kvols

    2016-01-01

    BIM Building Information Model or Modelling connects many different information
    systems from various actors during the building construction process with each
    other in one easily accessible and understandable model. BIM assures an effective
    and efficient building construction process by

  10. Implementation of a configurable laboratory information management system for use in cellular process development and manufacturing.

    Science.gov (United States)

    Russom, Diana; Ahmed, Amira; Gonzalez, Nancy; Alvarnas, Joseph; DiGiusto, David

    2012-01-01

    Regulatory requirements for the manufacturing of cell products for clinical investigation require a significant level of record-keeping, starting early in process development and continuing through to the execution and requisite follow-up of patients on clinical trials. Central to record-keeping is the management of documentation related to patients, raw materials, processes, assays and facilities. To support these requirements, we evaluated several laboratory information management systems (LIMS), including their cost, flexibility, regulatory compliance, ongoing programming requirements and ability to integrate with laboratory equipment. After selecting a system, we performed a pilot study to develop a user-configurable LIMS for our laboratory in support of our pre-clinical and clinical cell-production activities. We report here on the design and utilization of this system to manage accrual with a healthy blood-donor protocol, as well as manufacturing operations for the production of a master cell bank and several patient-specific stem cell products. The system was used successfully to manage blood donor eligibility, recruiting, appointments, billing and serology, and to provide annual accrual reports. Quality management reporting features of the system were used to capture, report and investigate process and equipment deviations that occurred during the production of a master cell bank and patient products. Overall the system has served to support the compliance requirements of process development and phase I/II clinical trial activities for our laboratory and can be easily modified to meet the needs of similar laboratories.

  11. Retailing Laboratory: Delivering Skills through Experiential Learning

    Science.gov (United States)

    Franco Valdez, Ana Dolores; Valdez Cervantes, Alfonso

    2018-01-01

    Building from a theoretical foundation of active learning, this article describes how using a retail laboratory in an educational curriculum can benefit both students and strategic partners. Students work alongside strategic partners, and the retail laboratory enables them to probe and design novel retailing strategies, such as launching new…

  12. Decision Tree Analysis Of Processes Generating Water-Related Building Damage : A Case Study In Rotterdam, The Netherlands

    NARCIS (Netherlands)

    Spekkers, M.H.; Clemens, F.H.L.R.; ten Veldhuis, J.A.E.; Piasecki, M

    2014-01-01

    The objective of this study was to identify the main failure mechanisms behind water-related building damage and to investigate to what extent these processes are related to characteristics of buildings and rainfall events. Results are based on the mining of property level insurance damage data, for

  13. Guidelines for Building Science Education

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, Cheryn E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rashkin, Samuel [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Huelman, Pat [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-11-01

    The U.S. Department of Energy’s (DOE) residential research and demonstration program, Building America, has triumphed through 20 years of innovation. Partnering with researchers, builders, remodelers, and manufacturers to develop innovative processes like advanced framing and ventilation standards, Building America has proven an energy efficient design can be more cost effective, healthy, and durable than a standard house. As Building America partners continue to achieve their stretch goals, they have found that the barrier to true market transformation for high performance homes is the limited knowledge-base of the professionals working in the building industry. With dozens of professionals taking part in the design and execution of building and selling homes, each person should have basic building science knowledge relevant to their role, and an understanding of how various home components interface with each other. Instead, our industry typically experiences a fragmented approach to home building and design. After obtaining important input from stakeholders at the Building Science Education Kick-Off Meeting, DOE created a building science education strategy addressing education issues preventing the widespread adoption of high performance homes. This strategy targets the next generation and provides valuable guidance for the current workforce. The initiative includes: • Race to Zero Student Design Competition: Engages universities and provides students who will be the next generation of architects, engineers, construction managers and entrepreneurs with the necessary skills and experience they need to begin careers in clean energy and generate creative solutions to real world problems. • Building Science to Sales Translator: Simplifies building science into compelling sales language and tools to sell high performance homes to their customers. • Building Science Education Guidance: Brings together industry and academia to solve problems related to

  14. Plutonium scrap processing at the Los Alamos Scientific Laboratory

    International Nuclear Information System (INIS)

    Nixon, A.E.; McKerley, B.J.; Christensen, E.L.

    1980-01-01

    The Los Alamos Scientific Laboratory currently has the newest plutonium handling facility in the nation. Los Alamos has been active in the processing of plutonium almost since the discovery of this man-made element in 1941. One of the functions of the new facility is the processing of plutonium scrap generated at LASL and other sites. The feed for the scrap processing program is extremely varied, and a wide variety of contaminants are often encountered. Depending upon the scrap matrix and contaminants present, the majority of material receives a nitric acid/hydrofluoric acid or nitric acid/calcium fluoride leach. The plutonium nitrate solutions are then loaded onto an anion exchange column charged with DOWEX 1 x 4, 50 to 100 mesh, nitrate form resin. The column is eluted with 0.48 M hydroxyl amine nitrate. The Pu(NO 3 ) 3 is then precipitated as plutonium III oxalate which is calcined at 450 to 500 0 C to yield a purified PuO 2 product

  15. Impact of virtual chemistry laboratory instruction on pre-service science teachers’ scientific process skills

    Directory of Open Access Journals (Sweden)

    Mutlu Ayfer

    2016-01-01

    Full Text Available This study aimed to investigate the impact of virtual chemistry laboratory instruction on pre-service science teachers’ scientific process skills. For this purpose, eight laboratory activities related to chemical kinetic, chemical equilibrium, thermochemistry, acids-bases, and electrochemistry were developed. Those activities were performed in virtual laboratory environment by the pre-service teachers in the experimental group and in the real laboratory environment by c the preservice teachers in the control group during eight weeks. Scientific process skills test developed by Burns, Okey and Wise [3], and translated into Turkish by Ateş and Bahar [2] was used before and after the instructions for data collection. According to results, while there was no significant difference between pre-test mean scores (U=133.500, p>0.05, significant difference between post-test mean scores was found in favour of experimental group (U=76.000, p<0.05. In addition, while no significant difference between pre-test mean scores for each sub-dimension was found, significant difference between post-test mean scores for designing investigation and formulating hypothesis skills was found in favour of experimental group.

  16. 209-E Building -- Response to ventilation failure evaluation

    International Nuclear Information System (INIS)

    Foust, D.J.

    1998-01-01

    This document provides an evaluation and recommendations for radiological workplace air monitoring and response to ventilation failure for the Critical Mass Laboratory, 209-E Building. The Critical Mass Laboratory, part of the 209-E Building, was designed to provide a heavily shielded room where plutonium and uranium liquid solutions could be brought into various critical configurations under readily controlled and monitored conditions. The facility is contained within a one-story L-shaped concrete block and reinforced concrete building. One wing houses offices, a control room, shops, and a common area while the other wing includes an equipment room, the change room, work areas, and the two-story Critical Assembly Room (CAR). Three of the rooms contain radiologically contaminated equipment and materials

  17. The activities of the IAEA laboratories Vienna. Annual report - 1980

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1982-03-01

    The report outlines the activities of the laboratory of the International Atomic Energy Agency at Seibersdorf in the province of Lower Austria. The report covers the following sections of the laboratory: chemistry, medical applications, dosimetry, soil science, entomology, plant breeding, electronics and measurement laboratory, isotope hydrology and the safeguards analytical laboratory. The extension to the main laboratory buildings - a new wing for medical applications and dosimetry - was fitted out and fully integrated into the laboratory by the end of the year. In July 1980 the high-level cobalt-60 dosimetry equipment (a teletherapy unit) was transferred from the old IAEA headquarters building in the centre of Vienna and installed in a specially designed annex to the new wing. A successful 8 week training course was given in the agriculture laboratory and arrangements were made for several of the course members to stay on as research fellows for several months after the course had ended

  18. Retrospect over past 25 years at Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology

    International Nuclear Information System (INIS)

    Aoki, Shigebumi

    1983-01-01

    Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology, was established on April 1, 1956, with the aims of the investigation on the peaceful use of nuclear energy and of the education of scientists and engineers in this field. This report reviews the history of the Laboratory during 25 years and traces the process of growth concerning research divisions, buildings, large-scale experimental facilities and the education in the graduate course for nuclear engineering. In addition, considering what the Laboratory has to be and what the future plan will be, it is mentioned that the research interest should be extended to the field of nuclear fusion reactor, especially the blanket engineering, as a long-term future project of the Research Laboratory. (author)

  19. 21 CFR 212.60 - What requirements apply to the laboratories where I test components, in-process materials, and...

    Science.gov (United States)

    2010-04-01

    ... maintenance. Each laboratory must have and follow written procedures to ensure that equipment is routinely... 21 Food and Drugs 4 2010-04-01 2010-04-01 false What requirements apply to the laboratories where...) Laboratory Controls § 212.60 What requirements apply to the laboratories where I test components, in-process...

  20. Decision process for the retrofit of municipal buildings with solar energy systems: a technical guide

    Energy Technology Data Exchange (ETDEWEB)

    Licciardello, Michael R.; Wood, Brian; Dozier, Warner; Braly, Mark; Yates, Alan

    1980-11-01

    As a background for solar applications, the following topics are covered: solar systems and components for retrofit installations; cost, performance, and quality considerations; and financing alternatives for local government. The retrofit decision process is discussed as follows: pre-screening of buildings, building data requirements, the energy conservation audit, solar system sizing and economics, comparison of alternatives, and implementation. Sample studies are presented for the West Valley Animal Shelter and the Hollywood Police Station. (MHR)

  1. The Influence of Laboratory Safety on Capital Planning.

    Science.gov (United States)

    Francis, Robert A.

    1980-01-01

    Discusses state and federal legislation concerning the handling of dangerous materials and its impact on the design of college and university buildings. Lists federal legislation affecting laboratory safety, the objectives of each act, and the influence of each act on laboratory safety. (IRT)

  2. Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996

    International Nuclear Information System (INIS)

    None

    1997-01-01

    OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D and D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D and D activities beginning in 1997

  3. Thermal comfort in residential buildings: Comfort values and scales for building energy simulation

    Energy Technology Data Exchange (ETDEWEB)

    Peeters, Leen; D' haeseleer, William [Division of Applied Mechanics and Energy Conversion, University of Leuven (K.U.Leuven), Celestijnenlaan 300 A, B-3001 Leuven (Belgium); Dear, Richard de [Division of Environmental and Life Sciences, Macquarie University, Sydney (Australia); Hensen, Jan [Faculty of Architecture, Building and Planning, Technische Universiteit Eindhoven, Vertigo 6.18, P.O. Box 513, 5600 MB Eindhoven (Netherlands)

    2009-05-15

    Building Energy Simulation (BES) programmes often use conventional thermal comfort theories to make decisions, whilst recent research in the field of thermal comfort clearly shows that important effects are not incorporated. The conventional theories of thermal comfort were set up based on steady state laboratory experiments. This, however, is not representing the real situation in buildings, especially not when focusing on residential buildings. Therefore, in present analysis, recent reviews and adaptations are considered to extract acceptable temperature ranges and comfort scales. They will be defined in an algorithm, easily implementable in any BES code. The focus is on comfortable temperature levels in the room, more than on the detailed temperature distribution within that room. (author)

  4. Database of full-scale laboratory experiments on wave-driven sand transport processes

    NARCIS (Netherlands)

    van der Werf, Jebbe J.; Schretlen, Johanna Lidwina Maria; Ribberink, Jan S.; O'Donoghue, Tom

    2009-01-01

    A new database of laboratory experiments involving sand transport processes over horizontal, mobile sand beds under full-scale non-breaking wave and non-breaking wave-plus-current conditions is described. The database contains details of the flow and bed conditions, information on which quantities

  5. Seismic analysis procedures for the plutonium processing building of the Special Isotope Separation Plant

    International Nuclear Information System (INIS)

    Chen, C.P.; Tajirian, F.F.; Todeschini, R.A.A.; Dahlke, H.J.

    1989-01-01

    This paper describes the methodology for the seismic soil-structure interaction (SSI) analysis of the Plutonium Processing Building (PPB) which is part of the Special Isotope Separation (SIS) Production Plant. The PPB consists of two structures, the enclosure building and the optics/separator area. These are founded on two independent foundations which are supported on the surface of a soil medium consisting of gravel overlying basalt. The PPB is classified as a safety related structure and is required to withstand the effects of a Design Basis Earthquake (DBE)

  6. Gamification as a Means to User Involvement in Decision-making Processes for Sustainable Buildings

    DEFF Research Database (Denmark)

    Hansen, Hanne Tine Ring; Knudstrup, Mary-Ann; Skøtt, Stine

    2017-01-01

    of life. Design thinking was used as method to develop a tool that focuses on how to make sustainable strategy development accessible to non-specialists during those critical stages of building design processes when goals and prioritisations are set. The tool is based on an open and editable platform...... and it will be available to the public in the early Summer of 2017. The paper presents how design thinking is used as an engaging research and development methodology, as well as, an introduction to the dialogue and prioritisation tool’s content and format.......User ownership, actors’ and stakeholders’ lack of knowledge is often identified as critical success parameters and barriers when evaluating how well sustainable buildings perform. Recognising that it is impossible to drive sustainable development without the people who pay for sustainable buildings...

  7. Building local human resources to implement SLMTA with limited donor funding: The Ghana experience

    Directory of Open Access Journals (Sweden)

    Bernard Nkrumah

    2014-11-01

    Full Text Available Background: In 2009, Ghana adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA programme in order to improve laboratory quality. The programme was implemented successfully with limited donor funding and local human resources. Objectives: To demonstrate how Ghana, which received very limited PEPFAR funding, was able to achieve marked quality improvement using local human resources. Method: Local partners led the SLMTA implementation and local mentors were embedded in each laboratory. An in-country training-of-trainers workshop was conducted in order to increase the pool of local SLMTA implementers. Three laboratory cohorts were enrolled in SLMTA in 2011, 2012 and 2013. Participants from each cohort attended in a series of three workshops interspersed with improvement projects and mentorship. Supplemental trainingon internal audit was provided. Baseline, exit and follow-up audits were conducted using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA checklist. In November 2013, four laboratories underwent official SLIPTA audits by the African Society for Laboratory Medicine (ASLM. Results: The local SLMTA team successfully implemented three cohorts of SLMTA in 15 laboratories. Seven out of the nine laboratories that underwent follow-up audits have reached at least one star. Three out of the four laboratories that underwent official ASLM audits were awarded four stars. Patient satisfaction increased from 25% to 70% and sample rejection rates decreased from 32% to 10%. On average, $40 000 was spent per laboratory to cover mentors’salaries, SLMTA training and improvement project support. Conclusion: Building in-country capacity through local partners is a sustainable model for improving service quality in resource-constrained countries such as Ghana. Such modelspromote country ownership, capacity building and the use of local human resources for the expansion of SLMTA.

  8. The radiological services laboratory

    International Nuclear Information System (INIS)

    Hardt, T.L.; Schutt, S.M.; Doran, K.S.; Dihel, D.L.; Lucas, R.O. II; Eifert, T.K.

    1992-01-01

    A new state of the art radiochemistry laboratory incorporating advanced design and environmental control elements has been constructed in Atlanta, Georgia. The design of the facility is oriented to the efficient production of analytical sample results which meet regulatory requirements while at the same time provides an atmosphere that is pleasurable for analysts and visitors alike. The laboratory building contains two separate and distinct laboratories under one roof. This allows the facility to handle samples with low levels of radioactivity on one side of the lab without fear of contamination of environmental work on the other side. Unlike most laboratories, this facility utilizes a scrubber system and liquid waste holdup system to prevent accidental releases to the environment. The potential spread of radioactive contamination is controlled through the use of negative pressure ventillation zones. Construction techniques, laboratory systems, instrumentation and ergonomic considerations will also be discussed. (author) 1 fig

  9. Kayenta Township Building & Safety Department, Tribal Green Building Code Summit Presentation

    Science.gov (United States)

    Tribal Green Building Code Summit Presentation by Kayenta Township Building & Safety Department showing how they established the building department, developed a code adoption and enforcement process, and hired staff to carry out the work.

  10. Challenges and Opportunities To Achieve 50% Energy Savings in Homes. National Laboratory White Papers

    Energy Technology Data Exchange (ETDEWEB)

    Bianchi, Marcus V.A. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2011-07-01

    This report summarizes the key opportunities, gaps, and barriers identified by researchers from four national laboratories (Lawrence Berkeley National Laboratory, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory) that must be addressed to achieve the longer term 50% saving goal for Building America to ensure coordination with the Building America industry teams who are focusing their research on systems to achieve the near-term 30% savings goal. Although new construction was included, the focus of the effort was on deep energy retrofits of existing homes.

  11. Implementation science: the laboratory as a command centre.

    Science.gov (United States)

    Boeras, Debrah I; Nkengasong, John N; Peeling, Rosanna W

    2017-03-01

    Recent advances in point-of-care technologies to ensure universal access to affordable quality-assured diagnostics have the potential to transform patient management, surveillance programmes, and control of infectious diseases. Decentralization of testing can put tremendous stresses on fragile health systems if the laboratory is not involved in the planning, introduction, and scale-up strategies. The impact of investments in novel technologies can only be realized if these tests are evaluated, adopted, and scaled up within the healthcare system with appropriate planning and understanding of the local contexts in which these technologies will be used. In this digital age, the laboratory needs to take on the role of the Command Centre for technology introduction and implementation. Implementation science is needed to understand the political, cultural, economic, and behavioural context for technology introduction. The new paradigm should include: building a comprehensive system of laboratories and point-of-care testing sites to provide quality-assured diagnostic services with good laboratory-clinic interface to build trust in test results and linkage to care; building and coordinating a comprehensive national surveillance and communication system for disease control and global health emergencies; conducting research to monitor the impact of new tools and interventions on improving patient care.

  12. Parametric Accuracy: Building Information Modeling Process Applied to the Cultural Heritage Preservation

    Science.gov (United States)

    Garagnani, S.; Manferdini, A. M.

    2013-02-01

    Since their introduction, modeling tools aimed to architectural design evolved in today's "digital multi-purpose drawing boards" based on enhanced parametric elements able to originate whole buildings within virtual environments. Semantic splitting and elements topology are features that allow objects to be "intelligent" (i.e. self-aware of what kind of element they are and with whom they can interact), representing this way basics of Building Information Modeling (BIM), a coordinated, consistent and always up to date workflow improved in order to reach higher quality, reliability and cost reductions all over the design process. Even if BIM was originally intended for new architectures, its attitude to store semantic inter-related information can be successfully applied to existing buildings as well, especially if they deserve particular care such as Cultural Heritage sites. BIM engines can easily manage simple parametric geometries, collapsing them to standard primitives connected through hierarchical relationships: however, when components are generated by existing morphologies, for example acquiring point clouds by digital photogrammetry or laser scanning equipment, complex abstractions have to be introduced while remodeling elements by hand, since automatic feature extraction in available software is still not effective. In order to introduce a methodology destined to process point cloud data in a BIM environment with high accuracy, this paper describes some experiences on monumental sites documentation, generated through a plug-in written for Autodesk Revit and codenamed GreenSpider after its capability to layout points in space as if they were nodes of an ideal cobweb.

  13. Transforming BIM to BEM: Generation of Building Geometry for the NASA Ames Sustainability Base BIM

    Energy Technology Data Exchange (ETDEWEB)

    O' Donnell, James T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Maile, Tobias [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rose, Cody [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mrazovic, Natasa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Morrissey, Elmer [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Regnier, Cynthia [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bazjanac, Vladimir [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-01

    Typical processes of whole Building Energy simulation Model (BEM) generation are subjective, labor intensive, time intensive and error prone. Essentially, these typical processes reproduce already existing data, i.e. building models already created by the architect. Accordingly, Lawrence Berkeley National Laboratory (LBNL) developed a semi-automated process that enables reproducible conversions of Building Information Model (BIM) representations of building geometry into a format required by building energy modeling (BEM) tools. This is a generic process that may be applied to all building energy modeling tools but to date has only been used for EnergyPlus. This report describes and demonstrates each stage in the semi-automated process for building geometry using the recently constructed NASA Ames Sustainability Base throughout. This example uses ArchiCAD (Graphisoft, 2012) as the originating CAD tool and EnergyPlus as the concluding whole building energy simulation tool. It is important to note that the process is also applicable for professionals that use other CAD tools such as Revit (“Revit Architecture,” 2012) and DProfiler (Beck Technology, 2012) and can be extended to provide geometry definitions for BEM tools other than EnergyPlus. Geometry Simplification Tool (GST) was used during the NASA Ames project and was the enabling software that facilitated semi-automated data transformations. GST has now been superseded by Space Boundary Tool (SBT-1) and will be referred to as SBT-1 throughout this report. The benefits of this semi-automated process are fourfold: 1) reduce the amount of time and cost required to develop a whole building energy simulation model, 2) enable rapid generation of design alternatives, 3) improve the accuracy of BEMs and 4) result in significantly better performing buildings with significantly lower energy consumption than those created using the traditional design process, especially if the simulation model was used as a predictive

  14. Quality Control of Boar Sperm Processing : Implications from European AI Centres and Two Spermatology Reference Laboratories

    NARCIS (Netherlands)

    Riesenbeck, A; Schulze, M; Rüdiger, K; Henning, H; Waberski, D

    In recent years, increased automatization has resulted in a higher efficiency of boar semen processing in AI laboratories. Sophisticated laboratory management and efficient quality control programmes are needed for current tendencies in major pork-producing countries to reduce the sperm number per

  15. Metals Processing Laboratory Users (MPLUS) Facility Annual Report: October 1, 2000 through September 30, 2001

    Energy Technology Data Exchange (ETDEWEB)

    Angelini, P

    2004-04-27

    The Metals Processing Laboratory Users Facility (MPLUS) is a Department of Energy (DOE), Energy Efficiency and Renewable Energy, Industrial Technologies Program user facility designated to assist researchers in key industries, universities, and federal laboratories in improving energy efficiency, improving environmental aspects, and increasing competitiveness. The goal of MPLUS is to provide access to the specialized technical expertise and equipment needed to solve metals processing issues that limit the development and implementation of emerging metals processing technologies. The scope of work can also extend to other types of materials. MPLUS has four primary User Centers including: (1) Processing--casting, powder metallurgy, deformation processing including (extrusion, forging, rolling), melting, thermomechanical processing, high density infrared processing; (2) Joining--welding, monitoring and control, solidification, brazing, bonding; (3) Characterization--corrosion, mechanical properties, fracture mechanics, microstructure, nondestructive examination, computer-controlled dilatometry, and emissivity; (4) Materials/Process Modeling--mathematical design and analyses, high performance computing, process modeling, solidification/deformation, microstructure evolution, thermodynamic and kinetic, and materials data bases. A fully integrated approach provides researchers with unique opportunities to address technologically related issues to solve metals processing problems and probe new technologies. Access is also available to 16 additional Oak Ridge National Laboratory (ORNL) user facilities ranging from state of the art materials characterization capabilities, high performance computing, to manufacturing technologies. MPLUS can be accessed through a standardized User-submitted Proposal and a User Agreement. Nonproprietary (open) or proprietary proposals can be submitted. For open research and development, access to capabilities is provides free of charge while

  16. Building Magnets at Brookhaven National Laboratory: A Condensed Account

    Science.gov (United States)

    Willen, Erich

    2017-09-01

    The development of superconducting wire and cable in the late twentieth century enabled high-field magnets and thus much higher beam-collision energies in accelerators. These higher collision energies have allowed experimentalists to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are the realm their experiments seek to investigate. The subject has aroused the curiosity of the public as well as scientists and has facilitated the support needed to build and operate such expensive machines and experiments. The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, facing both success and failure along the way. It is also a story of administrative imperatives that had unpredictable effects on a project's success, depending mostly on the people in the administrative roles and the decisions that they made.

  17. Safety analysis report 231-Z Building

    Energy Technology Data Exchange (ETDEWEB)

    Powers, C.S.

    1989-03-01

    This report provides an intensive review of the nuclear safety of the operation of the 231-Z Building. For background information complete descriptions of the floor plan, building services, alarm systems, and glove box systems are included in this report. In addition, references are included to The Plutonium Laboratory Radiation Work Procedures, Safety Guides, 231-Z Operating Procedures Manual and Nuclear Materials accountability Procedures. Engineered and administrative features contribute to the overall safety of personnel, the building, and environs. The consequences of credible incidents were considered and are discussed.

  18. High Performance Building Mockup in FLEXLAB

    Energy Technology Data Exchange (ETDEWEB)

    McNeil, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kohler, Christian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lee, Eleanor S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Selkowitz, Stephen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-08-30

    Genentech has ambitious energy and indoor environmental quality performance goals for Building 35 (B35) being constructed by Webcor at the South San Francisco campus. Genentech and Webcor contracted with the Lawrence Berkeley National Laboratory (LBNL) to test building systems including lighting, lighting controls, shade fabric, and automated shading controls in LBNL’s new FLEXLAB facility. The goal of the testing is to ensure that the systems installed in the new office building will function in a way that reduces energy consumption and provides a comfortable work environment for employees.

  19. Developing a customised approach for strengthening tuberculosis laboratory quality management systems toward accreditation

    Directory of Open Access Journals (Sweden)

    Heidi Albert

    2017-03-01

    Full Text Available Background: Quality-assured tuberculosis laboratory services are critical to achieve global and national goals for tuberculosis prevention and care. Implementation of a quality management system (QMS in laboratories leads to improved quality of diagnostic tests and better patient care. The Strengthening Laboratory Management Toward Accreditation (SLMTA programme has led to measurable improvements in the QMS of clinical laboratories. However, progress in tuberculosis laboratories has been slower, which may be attributed to the need for a structured tuberculosis-specific approach to implementing QMS. We describe the development and early implementation of the Strengthening Tuberculosis Laboratory Management Toward Accreditation (TB SLMTA programme. Development: The TB SLMTA curriculum was developed by customizing the SLMTA curriculum to include specific tools, job aids and supplementary materials specific to the tuberculosis laboratory. The TB SLMTA Harmonized Checklist was developed from the World Health Organisation Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation checklist, and incorporated tuberculosis-specific requirements from the Global Laboratory Initiative Stepwise Process Towards Tuberculosis Laboratory Accreditation online tool. Implementation: Four regional training-of-trainers workshops have been conducted since 2013. The TB SLMTA programme has been rolled out in 37 tuberculosis laboratories in 10 countries using the Workshop approach in 32 laboratories in five countries and the Facility based approach in five tuberculosis laboratories in five countries. Conclusion: Lessons learnt from early implementation of TB SLMTA suggest that a structured training and mentoring programme can build a foundation towards further quality improvement in tuberculosis laboratories. Structured mentoring, and institutionalisation of QMS into country programmes, is needed to support tuberculosis laboratories

  20. Evolution of a Corporate Knowledge Management and Knowledge Building Effort: A Case Study of Just-In-Time Training and Support of Laboratory Robotic Workstations Driven Through Online Community Portals

    Directory of Open Access Journals (Sweden)

    Karen Kearns

    2005-10-01

    Full Text Available This is a case study of the evolution of how a successful knowledge management initiative was achieved in a corporate learning organization. The initiative was centered on providing training tools and documentation of automated laboratory workstations that are utilized by scientists in a drug discovery environment. The case study will address the software tools, processes for content building, and the organizational dynamics that either assisted or blocked the progression of the initiative. Over a four-year period three distinct efforts were implemented, each differed in the particular software tools and focus of the initiatives. This presentation will compare and contrast the elements that provided barriers to success in the first two initiatives and the mechanisms and focus used in the third initiative that proved successful, scalable, and sustainable.

  1. A design guide for energy-efficient research laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Wishner, N.; Chen, A.; Cook, L. [eds.; Bell, G.C.; Mills, E.; Sartor, D.; Avery, D.; Siminovitch, M.; Piette, M.A.

    1996-09-24

    This document--A Design Guide for Energy-Efficient Research Laboratories--provides a detailed and holistic framework to assist designers and energy managers in identifying and applying advanced energy-efficiency features in laboratory-type environments. The Guide fills an important void in the general literature and compliments existing in-depth technical manuals. Considerable information is available pertaining to overall laboratory design issues, but no single document focuses comprehensively on energy issues in these highly specialized environments. Furthermore, practitioners may utilize many antiquated rules of thumb, which often inadvertently cause energy inefficiency. The Guide helps its user to: introduce energy decision-making into the earliest phases of the design process, access the literature of pertinent issues, and become aware of debates and issues on related topics. The Guide does focus on individual technologies, as well as control systems, and important operational factors such as building commissioning. However, most importantly, the Guide is intended to foster a systems perspective (e.g. right sizing) and to present current leading-edge, energy-efficient design practices and principles.

  2. Bore pile foundation tall buildings closed in the heritage building

    Science.gov (United States)

    Triastuti, Nusa Setiani

    2017-11-01

    Bore pile foundation for high building surroundings heritage building should be not damage. Construction proses must good, no necking, no mixed deep water, no sliding soil, nonporous concrete. Objective the execution of bore pile so that heritage buildings and neighboring buildings that are old do not experience cracks, damage and tilting. The survey methodology was observe the process of the implementation of the dominant silt, clay soil, in addition a limited space and to analyze the results of loading tests, investigations of soil and daily reports. Construction process determines the success of the structure bore pile in high building structure bearing, without damaging a heritage building. Attainment the hard soil depth, density concrete, observable clean reinforcement in the implementation. Monitoring the implementation of, among others, the face of the ground water little reduce in the area and outside the footprint of the building, no impact of vibration drilling equipment, watching the mud content on the water coming out at the time of drilling, concrete volume was monitored each 2 m bore depth of pile, The result researched heritage building was not damage. The test results bore pile axial, lateral analyzed the results have the appropriate force design required.

  3. Cloud-Based Virtual Laboratory for Network Security Education

    Science.gov (United States)

    Xu, Le; Huang, Dijiang; Tsai, Wei-Tek

    2014-01-01

    Hands-on experiments are essential for computer network security education. Existing laboratory solutions usually require significant effort to build, configure, and maintain and often do not support reconfigurability, flexibility, and scalability. This paper presents a cloud-based virtual laboratory education platform called V-Lab that provides a…

  4. Lambda-Based Data Processing Architecture for Two-Level Load Forecasting in Residential Buildings

    Directory of Open Access Journals (Sweden)

    Gde Dharma Nugraha

    2018-03-01

    Full Text Available Building energy management systems (BEMS have been intensively used to manage the electricity consumption of residential buildings more efficiently. However, the dynamic behavior of the occupants introduces uncertainty problems that affect the performance of the BEMS. To address this uncertainty problem, the BEMS may implement load forecasting as one of the BEMS modules. Load forecasting utilizes historical load data to compute model predictions for a specific time in the future. Recently, smart meters have been introduced to collect electricity consumption data. Smart meters not only capture aggregation data, but also individual data that is more frequently close to real-time. The processing of both smart meter data types for load forecasting can enhance the performance of the BEMS when confronted with uncertainty problems. The collection of smart meter data can be processed using a batch approach for short-term load forecasting, while the real-time smart meter data can be processed for very short-term load forecasting, which adjusts the short-term load forecasting to adapt to the dynamic behavior of the occupants. This approach requires different data processing techniques for aggregation and individual of smart meter data. In this paper, we propose Lambda-based data processing architecture to process the different types of smart meter data and implement the two-level load forecasting approach, which combines short-term and very short-term load forecasting techniques on top of our proposed data processing architecture. The proposed approach is expected to enhance the BEMS to address the uncertainty problem in order to process data in less time. Our experiment showed that the proposed approaches improved the accuracy by 7% compared to a typical BEMS with only one load forecasting technique, and had the lowest computation time when processing the smart meter data.

  5. SOL-IND. Photovoltaics integrated in an industrialised building process. Final report; SOL-IND. Solceller integreret i industrielt byggeri. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Frederiksen, K.H.B.; Vestersager Engdal, J. (EnergiMidt A/S, Silkeborg (Denmark))

    2008-06-15

    The purpose of the project, EFP06 - Photovoltaics integrated in an industrialised building process (SOLIND), has been to examine the possibilities for PV (photovoltaics) in an industrialized building process. The project is an information gathering and development project with basis in knowledge about the possibilities for PV in relation to specific housing projects in Skanska Bolig A/S, including BoKlok, developed in cooperation with IKEA. During the project a workshop with participating architectural students has been carried through resulting in detailed concepts. The concepts have in general terms been introduced nationally to the press and were invited to a poster presentation at the world's largest PV conference. In addition to this, a number of prototypes are produced together with other presentation material. The projects has been divided into three phases. The report is divided into these three phases. 1) Knowledge gathering and unravelling 2) Analysis, development and evaluation, workshop for students. 3) Promotion and demonstration of results The main results are: 4) The project has resulted in increased knowledge about the possibilities with photovoltaics in industrialized building processes. 5) A number of concepts have been developed to fit PV in the project phase of an industrialized building process. 6) The most promising concepts has been demonstrated as prototypes in different scale together with other presentation materials The project continues in SOL-IND2, with the purpose to prepare and carry out an integration of a PV system in an industrialized building process. A subsidy is granted in 2008 from the EFP to prepare the construction. (au)

  6. Analysis of environmental contamination resulting from catastrophic incidents: part 2. Building laboratory capability by selecting and developing analytical methodologies.

    Science.gov (United States)

    Magnuson, Matthew; Campisano, Romy; Griggs, John; Fitz-James, Schatzi; Hall, Kathy; Mapp, Latisha; Mullins, Marissa; Nichols, Tonya; Shah, Sanjiv; Silvestri, Erin; Smith, Terry; Willison, Stuart; Ernst, Hiba

    2014-11-01

    Catastrophic incidents can generate a large number of samples of analytically diverse types, including forensic, clinical, environmental, food, and others. Environmental samples include water, wastewater, soil, air, urban building and infrastructure materials, and surface residue. Such samples may arise not only from contamination from the incident but also from the multitude of activities surrounding the response to the incident, including decontamination. This document summarizes a range of activities to help build laboratory capability in preparation for sample analysis following a catastrophic incident, including selection and development of fit-for-purpose analytical methods for chemical, biological, and radiological contaminants. Fit-for-purpose methods are those which have been selected to meet project specific data quality objectives. For example, methods could be fit for screening contamination in the early phases of investigation of contamination incidents because they are rapid and easily implemented, but those same methods may not be fit for the purpose of remediating the environment to acceptable levels when a more sensitive method is required. While the exact data quality objectives defining fitness-for-purpose can vary with each incident, a governing principle of the method selection and development process for environmental remediation and recovery is based on achieving high throughput while maintaining high quality analytical results. This paper illustrates the result of applying this principle, in the form of a compendium of analytical methods for contaminants of interest. The compendium is based on experience with actual incidents, where appropriate and available. This paper also discusses efforts aimed at adaptation of existing methods to increase fitness-for-purpose and development of innovative methods when necessary. The contaminants of interest are primarily those potentially released through catastrophes resulting from malicious activity

  7. CLAMP - a toolkit for efficiently building customized clinical natural language processing pipelines.

    Science.gov (United States)

    Soysal, Ergin; Wang, Jingqi; Jiang, Min; Wu, Yonghui; Pakhomov, Serguei; Liu, Hongfang; Xu, Hua

    2017-11-24

    Existing general clinical natural language processing (NLP) systems such as MetaMap and Clinical Text Analysis and Knowledge Extraction System have been successfully applied to information extraction from clinical text. However, end users often have to customize existing systems for their individual tasks, which can require substantial NLP skills. Here we present CLAMP (Clinical Language Annotation, Modeling, and Processing), a newly developed clinical NLP toolkit that provides not only state-of-the-art NLP components, but also a user-friendly graphic user interface that can help users quickly build customized NLP pipelines for their individual applications. Our evaluation shows that the CLAMP default pipeline achieved good performance on named entity recognition and concept encoding. We also demonstrate the efficiency of the CLAMP graphic user interface in building customized, high-performance NLP pipelines with 2 use cases, extracting smoking status and lab test values. CLAMP is publicly available for research use, and we believe it is a unique asset for the clinical NLP community. © The Author 2017. Published by Oxford University Press on behalf of the American Medical Informatics Association. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  8. Lawrence Berkeley Laboratory upgrading approaches to existing facilities

    International Nuclear Information System (INIS)

    Engle, H.M. Jr.

    1985-01-01

    The Lawrence Berkeley Laboratory Plant Engineering Department instituted a seismic risk investigation and seismic upgrade program in 1970. This paper covers the upgrade of two buildings with dissimilar framing systems; Building No. 10, a World War II vintage heavy timber frame building, and Building No. 80, a steel frame structure constructed in 1954. The seismic upgrade task for both structures required that the buildings be kept in service during rehabilitation with a minimum of disruption to occupants. Rehabilitations were phased over two and three year periods with construction management and supervision performed by LBL Plant Engineering staff

  9. Building 774: open for business

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    In July 2012, the demolition of Building 936 on the Prévessin site marked the start of the Building 774 project. On 23 February, less than three years later, the new 3900 m2 building was handed over to the BE department.   The brand new Building 774. (Credits: Francesco Soppelsa) Located near to the CERN Control Centre, Building 774 contains offices, laboratories and meeting rooms, as well as a huge public area consisting of a 104-seat auditorium, a changing room/shower area in the basement and a pleasant cafeteria open from 8 a.m. to 5 p.m., offering a wide range of refreshments including hot meals at lunchtime. “There were a few twists and turns during the construction of this building, but it all turned out well in the end!" says Michael Poehler, a member of the GS-SE group and the technical coordinator of the project. (Credits: Francesco Soppelsa) The 120 occupants of the building have just moved into their brand new home, bringing all the members of the...

  10. Final Report Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York

    Energy Technology Data Exchange (ETDEWEB)

    Evan Harpeneau

    2011-06-24

    The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

  11. Processing of Building Binder Materials to Increase their Activation

    Science.gov (United States)

    Fediuk, R. S.; Garmashov, I. S.; Kuzmin, D. E.; Stoyushko, N. Yu; Gladkova, N. A.

    2018-01-01

    The paper deals modern physical methods of activation of building powder materials. During mechanical activation a composite binder active molecules cement minerals occur in the destruction of the molecular defects in the areas of packaging and breaking metastable phase decompensation intermolecular forces. The process is accompanied by a change in the kinetics of hardening of Portland cement. Activated concrete has a number of features that are used as design characteristics of structures and are due to the structure of the activated binder and its contacts with concrete aggregates. These features also have a significant impact on the nature of the destruction of concrete under load, changing the boundaries of its microcracks and durability.

  12. An easy-to-build remote laboratory with data transfer using the Internet School Experimental System

    Science.gov (United States)

    Schauer, František; Lustig, František; Dvořák, Jiří; Ožvoldová, Miroslava

    2008-07-01

    The present state of information communication technology makes it possible to devise and run computer-based e-laboratories accessible to any user with a connection to the Internet, equipped with very simple technical means and making full use of web services. Thus, the way is open for a new strategy of physics education with strongly global features, based on experiment and experimentation. We name this strategy integrated e-learning, and remote experiments across the Internet are the foundation for this strategy. We present both pedagogical and technical reasoning for the remote experiments and outline a simple system based on a server-client approach, and on web services and Java applets. We give here an outline of the prospective remote laboratory system with data transfer using the Internet School Experimental System (ISES) as hardware and ISES WEB Control kit as software. This approach enables the simple construction of remote experiments without building any hardware and virtually no programming, using a paste and copy approach with typical prebuilt blocks such as a camera view, controls, graphs, displays, etc. We have set up and operate at present seven experiments, running round the clock, with more than 12 000 connections since 2005. The experiments are widely used in practical teaching of both university and secondary level physics. The recording of the detailed steps the experimentor takes during the measurement enables detailed study of the psychological aspects of running the experiments. The system is ready for a network of universities to start covering the basic set of physics experiments. In conclusion we summarize the results achieved and experiences of using remote experiments built on the ISES hardware system.

  13. An easy-to-build remote laboratory with data transfer using the Internet School Experimental System

    International Nuclear Information System (INIS)

    Schauer, Frantisek; Ozvoldova, Miroslava; Lustig, Frantisek; Dvorak, JirI

    2008-01-01

    The present state of information communication technology makes it possible to devise and run computer-based e-laboratories accessible to any user with a connection to the Internet, equipped with very simple technical means and making full use of web services. Thus, the way is open for a new strategy of physics education with strongly global features, based on experiment and experimentation. We name this strategy integrated e-learning, and remote experiments across the Internet are the foundation for this strategy. We present both pedagogical and technical reasoning for the remote experiments and outline a simple system based on a server-client approach, and on web services and Java applets. We give here an outline of the prospective remote laboratory system with data transfer using the Internet School Experimental System (ISES) as hardware and ISES WEB Control kit as software. This approach enables the simple construction of remote experiments without building any hardware and virtually no programming, using a paste and copy approach with typical prebuilt blocks such as a camera view, controls, graphs, displays, etc. We have set up and operate at present seven experiments, running round the clock, with more than 12 000 connections since 2005. The experiments are widely used in practical teaching of both university and secondary level physics. The recording of the detailed steps the experimentor takes during the measurement enables detailed study of the psychological aspects of running the experiments. The system is ready for a network of universities to start covering the basic set of physics experiments. In conclusion we summarize the results achieved and experiences of using remote experiments built on the ISES hardware system

  14. An easy-to-build remote laboratory with data transfer using the Internet School Experimental System

    Energy Technology Data Exchange (ETDEWEB)

    Schauer, Frantisek; Ozvoldova, Miroslava [Trnava University, Faculty of Pedagogy, Department of Physics, Trnava (Slovakia); Lustig, Frantisek; Dvorak, JirI [Charles University, Faculty of Mathematics and Physics, Department of Didactics of Physics, Prague (Czech Republic)], E-mail: fschauer@ft.utb.cz

    2008-07-15

    The present state of information communication technology makes it possible to devise and run computer-based e-laboratories accessible to any user with a connection to the Internet, equipped with very simple technical means and making full use of web services. Thus, the way is open for a new strategy of physics education with strongly global features, based on experiment and experimentation. We name this strategy integrated e-learning, and remote experiments across the Internet are the foundation for this strategy. We present both pedagogical and technical reasoning for the remote experiments and outline a simple system based on a server-client approach, and on web services and Java applets. We give here an outline of the prospective remote laboratory system with data transfer using the Internet School Experimental System (ISES) as hardware and ISES WEB Control kit as software. This approach enables the simple construction of remote experiments without building any hardware and virtually no programming, using a paste and copy approach with typical prebuilt blocks such as a camera view, controls, graphs, displays, etc. We have set up and operate at present seven experiments, running round the clock, with more than 12 000 connections since 2005. The experiments are widely used in practical teaching of both university and secondary level physics. The recording of the detailed steps the experimentor takes during the measurement enables detailed study of the psychological aspects of running the experiments. The system is ready for a network of universities to start covering the basic set of physics experiments. In conclusion we summarize the results achieved and experiences of using remote experiments built on the ISES hardware system.

  15. Rising damp in building walls: the wall base ventilation system

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, A.S.; Delgado, J.M.P.Q.; Freitas, V.P. de [Faculdade de Engenharia da Universidade do Porto, Laboratorio de Fisica das Construcoes (LFC), Departamento de Engenharia Civil, Porto (Portugal)

    2012-12-15

    This work intends to validate a new system for treating rising damp in historic buildings walls. The results of laboratory experiments show that an efficient way of treating rising damp is by ventilating the wall base, using the HUMIVENT technique. The analytical model presented describes very well the observed features of rising damp in walls, verified by laboratory tests, who contributed for a simple sizing of the wall base ventilation system that will be implemented in historic buildings. (orig.)

  16. Gamification in Science Education: Gamifying Learning of Microscopic Processes in the Laboratory

    Science.gov (United States)

    Fleischmann, Katja; Ariel, Ellen

    2016-01-01

    Understanding and trouble-shooting microscopic processes involved in laboratory tests are often challenging for students in science education because of the inability to visualize the different steps and the various errors that may influence test outcome. The effectiveness of gamification or the use of game design elements and game-mechanics were…

  17. Reducing Plug and Process Loads for a Large Scale, Low Energy Office Building: NREL's Research Support Facility; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lobato, C.; Pless, S.; Sheppy, M.; Torcellini, P.

    2011-02-01

    This paper documents the design and operational plug and process load energy efficiency measures needed to allow a large scale office building to reach ultra high efficiency building goals. The appendices of this document contain a wealth of documentation pertaining to plug and process load design in the RSF, including a list of equipment was selected for use.

  18. Cursory radiological assessment: Battelle Columbus Laboratory Decommissioning and Decontamination Project

    International Nuclear Information System (INIS)

    Smith, W.H.; Munyon, W.J.; Mosho, G.D.; Robinet, M.J.; Wynveen, R.A.

    1988-10-01

    This document reports on the results obtained from a cursory radiological assessment of various properties at the Battelle Columbus Laboratory, Columbia, Ohio. The cursory radiological assessment is part of a preliminary investigation for the Battelle Columbus Laboratory Decommissioning and Decontamination Project. The radiological assessment of Battelle Columbus Laboratory's two sites included conducting interior and exterior building surveys and collecting and analyzing air, sewer system, and soil samples. Direct radiological surveys were made of floor, wall, and overhead areas. Smear surveys were made on various interior building surfaces as well as the exterior building vents. Air samples were collected in select areas to determine concentrations of Rn-222, Rn-220, and Rn-219 daughters, in addition to any long-lived radioactive particulates. Radon-222 concentrations were continuously monitored over a 24-hr period at several building locations using a radon gas monitoring system. The sanitary sewer systems at King Avenue, West Jefferson-North, and West Jefferson-South were each sampled at select locations. All samples were submitted to the Argonne Analytical Chemistry Laboratory for various radiological and chemical analyses. Environmental soil corings were taken at both the King Avenue and West Jefferson sites to investigate the potential for soil contamination within the first 12-inches below grade. Further subsurface investigations at the West Jefferson-North and West Jefferson-South areas were conducted using soil boring techniques. 4 refs., 10 figs., 10 tabs

  19. Modelling and experimental investigation of waste tyre pyrolysis process in a laboratory reactor

    Directory of Open Access Journals (Sweden)

    Rudniak Leszek

    2017-09-01

    Full Text Available A mathematical model of waste tyre pyrolysis process is developed in this work. Tyre material decomposition based on a simplified reaction mechanism leads to main product lumps: noncondensable (gas, condensable (pyrolytic oil and solid (char. The model takes into account kinetics of heat and mass transfer in the grain of the shredded rubber material as well as surrounding gas phase. The main reaction routes were modelled as the pseudo-first order reactions with a rate constant calculated from the Arrhenius type equation using literature values of activation energy determined for main tyre constituents based on TG/DTG measurements and tuned pre-exponential parameter values obtained by fitting theoretical predictions to the experimental results obtained in our laboratory reactor. The model was implemented within the CFD software (ANSYS Fluent. The results of numerical simulation of the pyrolysis process revealed non-uniformity of sample’s porosity and temperature. The simulation predictions were in satisfactory agreement with the experimentally measured mass loss of the tyre sample during pyrolysis process investigated in a laboratory reactor.

  20. Automated Radioanalytical Chemistry: Applications For The Laboratory And Industrial Process Monitoring

    International Nuclear Information System (INIS)

    O'Hara, Matthew J.; Farawila, Anne F.; Grate, Jay W.

    2009-01-01

    The identification and quantification of targeted α- and β-emitting radionuclides via destructive analysis in complex radioactive liquid matrices is highly challenging. Analyses are typically accomplished at on- or off-site laboratories through laborious sample preparation steps and extensive chemical separations followed by analysis using a variety of detection methodologies (e.g., liquid scintillation, alpha energy spectroscopy, mass spectrometry). Analytical results may take days or weeks to report. When an industrial-scale plant requires periodic or continuous monitoring of radionuclides as an indication of the composition of its feed stream, diversion of safeguarded nuclides, or of plant operational conditions (for example), radiochemical measurements should be rapid, but not at the expense of precision and accuracy. Scientists at Pacific Northwest National Laboratory have developed and characterized a host of automated radioanalytical systems designed to perform reproducible and rapid radioanalytical processes. Platforms have been assembled for (1) automation and acceleration of sample analysis in the laboratory and (2) automated monitors for monitoring industrial scale nuclear processes on-line with near-real time results. These methods have been applied to the analysis of environmental-level actinides and fission products to high-level nuclear process fluids. Systems have been designed to integrate a number of discrete sample handling steps, including sample pretreatment (e.g., digestion and valence state adjustment) and chemical separations. The systems have either utilized on-line analyte detection or have collected the purified analyte fractions for off-line measurement applications. One PNNL system of particular note is a fully automated prototype on-line radioanalytical system designed for the Waste Treatment Plant at Hanford, WA, USA. This system demonstrated nearly continuous destructive analysis of the soft β-emitting radionuclide 99Tc in nuclear

  1. Implications of Building Information Modeling on Interior Design Education: The Impact on Teaching Design Processes

    Directory of Open Access Journals (Sweden)

    Amy Roehl, MFA

    2013-06-01

    Full Text Available Currently, major shifts occur in design processes effecting business practices for industries involved with designing and delivering the built environment. These changing conditions are a direct result of industry adoption of relatively new technologies called BIM or Building Information Modeling. This review of literature examines implications of these changing processes on interior design education.

  2. Process and a device for manufacturing a composite building panel for use in a building structure cladding system

    Energy Technology Data Exchange (ETDEWEB)

    Tetu, B

    1991-06-11

    A process and device are disclosed for manufacturing a composite panel used for cladding a building. The panel comprises a facing layer made from a plurality of facing elements, such as brick slices, retained in a spaced-apart relationship, and magnetically attractible particulate material disposed between the facing elements to imitate mortar. A rigid backing layer is provided, spaced from the spacing layer, and the space between the facing and the backing layers is filled with an insulation/bonding layer, made of urethane foam. The device for manufacturing the panel comprises a facing element holder in the form of a structure with a plurality of recesses for receiving facing elements, also including spacers between the recesses in order to retain the facing elements in a spaced-apart relationship. Ceramic magnets are provided on the spacers for temporarily retaining the particulate material against gravity until the insulation/bonding layer is built which retains all the panel elements together. The invention enables manufacture of non-planar panels, such as those used on corners of buildings, thereby eliminating the need for a corner joint. 9 figs.

  3. On-line Data Transmission, as Part of the Seismic Evaluation Process in the Buildings Field

    Science.gov (United States)

    Sorin Dragomir, Claudiu; Dobre, Daniela; Craifaleanu, Iolanda; Georgescu, Emil-Sever

    2017-12-01

    The thorough analytical modelling of seismic actions, of the structural system and of the foundation soil is essential for a proper dynamic analysis of a building. However, the validation of the used models should be made, whenever possible, with reference to results obtained from experimental investigations, building instrumentation and monitoring of vibrations generated by various seismic or non-seismic sources. In Romania, the permanent seismic instrumentation/monitoring of buildings is part of a special follow-up activity, performed in accordance with the P130/1999 code for the time monitoring of building behaviour and with the seismic design code, P100-2013. By using the state-of-the-art modern equipment (GeoSIG and Kinemetrics digital accelerographs) in the seismic network of the National Institute for Research and Development URBAN-INCERC, the instrumented buildings can be monitored remotely, with recorded data being sent to authorities or to research institutes in the field by a real-time data transmission system. The obtained records are processed, computing the Fourier amplitude spectra and the response spectra, and the modal parameters of buildings are determined. The paper presents some of the most important results of the institute in the field of building monitoring, focusing on the situation of some significant instrumented buildings located in different parts of the country. In addition, maps with data received from seismic stations after the occurrence of two recent Vrancea (Romania) earthquakes, showing the spatial distribution of ground accelerations, are presented, together with a comparative analysis, performed with reference to previous studies in the literature.

  4. Proceedings of the workshop on cool building materials

    Energy Technology Data Exchange (ETDEWEB)

    Akbari, H.; Fishman, B. [Lawrence Berkeley Lab., CA (United States); Frohnsdorff, G. [National Inst. of Standards and Technology (NEL), Gaithersburg, MD (United States). Building Materials Div.] [eds.

    1994-04-01

    The Option 9, Cool Communities, of the Clinton-Gore Climate Change Action Plan (CCAP) calls for mobilizing community and corporate resources to strategically plant trees and lighten the surfaces of buildings and roads in order to reduce cooling energy use of the buildings. It is estimated that Cool Communities Project will potentially save over 100 billion kilowatt-hour of energy per year corresponding to 27 million tons of carbon per year by the year 2015. To pursue the CCAP`s objectives, Lawrence Berkeley Laboratory (LBL) on behalf of the Department of Energy and the Environmental Protection Agency, in cooperation with the Building and Fire Research Laboratory of the National Institute of Standards and Technology (NIST), organized a one-day meeting to (1) explore the need for developing a national plan to assess the technical feasibility and commercial potential of high-albedo (``cool``) building materials, and if appropriate, to (2) outline a course of action for developing the plan. The meeting took place on February 28, 1994, in Gaithersburg, Maryland. The proceedings of the conference, Cool Building Materials, includes the minutes of the conference and copies of presentation materials distributed by the conference participants.

  5. Biosafety and biosecurity in veterinary laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Melissa R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Astuto-Gribble, Lisa M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brass, Van Hildren [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-08-01

    Here, with recent outbreaks of MERS-Cov, Anthrax, Nipah, and Highly Pathogenic Avian Influenza, much emphasis has been placed on rapid identification of infectious agents globally. As a result, laboratories are building capacity, conducting more advanced and sophisticated research, increasing laboratory staff, and establishing collections of dangerous pathogens in an attempt to reduce the impact of infectious disease outbreaks and characterize disease causing agents. With this expansion, the global laboratory community has started to focus on laboratory biosafety and biosecurity to prevent the accidental and/or intent ional release o f these agents. Laboratory biosafety and biosecurity systems are used around the world to help mit igate the risks posed by dangerous pathogens in the laboratory. Veterinary laboratories carry unique responsibilities to workers and communities to safely and securely handle disease causing microorganisms. Many microorganisms studied in veterinary laboratories not only infect animals, but also have the potential to infect humans. This paper will discuss the fundamentals of laboratory biosafety and biosecurity.

  6. General vibration monitoring: Utility Building, August 1992

    International Nuclear Information System (INIS)

    Jendrzejczyk, J.A.; Wambsganss, M.W.; Smith, R.K.

    1993-01-01

    This vibration data was generated from measurements made on 8/12/92. The contents are self explanatory. They are baseline measurements and no exceptionally large vibration amplitude or response was observed. These measurements represent baseline measurements, i.e., measurements with no driving forces active, made on the utility building, a service building for the Advanced Photon Source at Argonne National Laboratory

  7. Design-Build Process for the Research Support Facility (RSF) (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2012-06-01

    An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.

  8. Building America Systems Integration Research Annual Report: FY 2012

    Energy Technology Data Exchange (ETDEWEB)

    Gestwick, M.

    2013-05-01

    This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  9. Building America Systems Integration Research Annual Report. FY 2012

    Energy Technology Data Exchange (ETDEWEB)

    Gestwick, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-05-01

    This Building America FY2012 Annual Report includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  10. Dose profile modeling of Idaho National Laboratory's active neutron interrogation laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Chichester, D.L. [Idaho National Laboratory, 2525 N. Fremont Avenue, Idaho Falls, ID 83415 (United States)], E-mail: david.chichester@inl.gov; Seabury, E.H.; Zabriskie, J.M.; Wharton, J.; Caffrey, A.J. [Idaho National Laboratory, 2525 N. Fremont Avenue, Idaho Falls, ID 83415 (United States)

    2009-06-15

    A new laboratory has been commissioned at Idaho National Laboratory for performing active neutron interrogation research and development. The facility is designed to provide radiation shielding for deuterium-tritium (DT) fusion (14.1 MeV) neutron generators (2x10{sup 8} n/s), deuterium-deuterium (DD) fusion (2.5 MeV) neutron generators (1x10{sup 7} n/s), and {sup 252}Cf spontaneous fission neutron sources (6.96x10{sup 7} n/s, 30 {mu}g). Shielding at the laboratory is comprised of modular concrete shield blocks 0.76 m thick with tongue-in-groove features to prevent radiation streaming, arranged into one small and one large test vault. The larger vault is designed to allow operation of the DT generator and has walls 3.8 m tall, an entrance maze, and a fully integrated electrical interlock system; the smaller test vault is designed for {sup 252}Cf and DD neutron sources and has walls 1.9 m tall and a simple entrance maze. Both analytical calculations and numerical simulations were used in the design process for the building to assess the performance of the shielding walls and to ensure external dose rates are within required facility limits. Dose rate contour plots have been generated for the facility to visualize the effectiveness of the shield walls and entrance mazes and to illustrate the spatial profile of the radiation dose field above the facility and the effects of skyshine around the vaults.

  11. Errors in clinical laboratories or errors in laboratory medicine?

    Science.gov (United States)

    Plebani, Mario

    2006-01-01

    Laboratory testing is a highly complex process and, although laboratory services are relatively safe, they are not as safe as they could or should be. Clinical laboratories have long focused their attention on quality control methods and quality assessment programs dealing with analytical aspects of testing. However, a growing body of evidence accumulated in recent decades demonstrates that quality in clinical laboratories cannot be assured by merely focusing on purely analytical aspects. The more recent surveys on errors in laboratory medicine conclude that in the delivery of laboratory testing, mistakes occur more frequently before (pre-analytical) and after (post-analytical) the test has been performed. Most errors are due to pre-analytical factors (46-68.2% of total errors), while a high error rate (18.5-47% of total errors) has also been found in the post-analytical phase. Errors due to analytical problems have been significantly reduced over time, but there is evidence that, particularly for immunoassays, interference may have a serious impact on patients. A description of the most frequent and risky pre-, intra- and post-analytical errors and advice on practical steps for measuring and reducing the risk of errors is therefore given in the present paper. Many mistakes in the Total Testing Process are called "laboratory errors", although these may be due to poor communication, action taken by others involved in the testing process (e.g., physicians, nurses and phlebotomists), or poorly designed processes, all of which are beyond the laboratory's control. Likewise, there is evidence that laboratory information is only partially utilized. A recent document from the International Organization for Standardization (ISO) recommends a new, broader definition of the term "laboratory error" and a classification of errors according to different criteria. In a modern approach to total quality, centered on patients' needs and satisfaction, the risk of errors and mistakes

  12. BIM. Building Information Model. Special issue; BIM. Building Information Model. Themanummer

    Energy Technology Data Exchange (ETDEWEB)

    Van Gelder, A.L.A. [Arta and Consultancy, Lage Zwaluwe (Netherlands); Van den Eijnden, P.A.A. [Stichting Marktwerking Installatietechniek, Zoetermeer (Netherlands); Veerman, J.; Mackaij, J.; Borst, E. [Royal Haskoning DHV, Nijmegen (Netherlands); Kruijsse, P.M.D. [Wolter en Dros, Amersfoort (Netherlands); Buma, W. [Merlijn Media, Waddinxveen (Netherlands); Bomhof, F.; Willems, P.H.; Boehms, M. [TNO, Delft (Netherlands); Hofman, M.; Verkerk, M. [ISSO, Rotterdam (Netherlands); Bodeving, M. [VIAC Installatie Adviseurs, Houten (Netherlands); Van Ravenswaaij, J.; Van Hoven, H. [BAM Techniek, Bunnik (Netherlands); Boeije, I.; Schalk, E. [Stabiplan, Bodegraven (Netherlands)

    2012-11-15

    A series of 14 articles illustrates the various aspects of the Building Information Model (BIM). The essence of BIM is to capture information about the building process and the building product. [Dutch] In 14 artikelen worden diverse aspecten m.b.t. het Building Information Model (BIM) belicht. De essentie van BIM is het vastleggen van informatie over het bouwproces en het bouwproduct.

  13. Artificial intelligence in the materials processing laboratory

    Science.gov (United States)

    Workman, Gary L.; Kaukler, William F.

    1990-01-01

    Materials science and engineering provides a vast arena for applications of artificial intelligence. Advanced materials research is an area in which challenging requirements confront the researcher, from the drawing board through production and into service. Advanced techniques results in the development of new materials for specialized applications. Hand-in-hand with these new materials are also requirements for state-of-the-art inspection methods to determine the integrity or fitness for service of structures fabricated from these materials. Two problems of current interest to the Materials Processing Laboratory at UAH are an expert system to assist in eddy current inspection of graphite epoxy components for aerospace and an expert system to assist in the design of superalloys for high temperature applications. Each project requires a different approach to reach the defined goals. Results to date are described for the eddy current analysis, but only the original concepts and approaches considered are given for the expert system to design superalloys.

  14. Customizable Electronic Laboratory Online (CELO): A Web-based Data Management System Builder for Biomedical Research Laboratories

    Science.gov (United States)

    Fong, Christine; Brinkley, James F.

    2006-01-01

    A common challenge among today’s biomedical research labs is managing growing amounts of research data. In order to reduce the time and resource costs of building data management tools, we designed the Customizable Electronic Laboratory Online (CELO) system. CELO automatically creates a generic database and web interface for laboratories that submit a simple web registration form. Laboratories can then use a collection of predefined XML templates to assist with the design of a database schema. Users can immediately utilize the web-based system to query data, manage multimedia files, and securely share data remotely over the internet. PMID:17238541

  15. Processing ultrasonic inspection data from multiple scan patterns for turbine rotor weld build-up evaluations

    Science.gov (United States)

    Guan, Xuefei; Rasselkorde, El Mahjoub; Abbasi, Waheed; Zhou, S. Kevin

    2015-03-01

    The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location. The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.

  16. Implementation of the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation.

    Science.gov (United States)

    Ndihokubwayo, Jean-Bosco; Maruta, Talkmore; Ndlovu, Nqobile; Moyo, Sikhulile; Yahaya, Ali Ahmed; Coulibaly, Sheick Oumar; Kasolo, Francis; Turgeon, David; Abrol, Angelii P

    2016-01-01

    The increase in disease burden has continued to weigh upon health systems in Africa. The role of the laboratory has become increasingly critical in the improvement of health for diagnosis, management and treatment of diseases. In response, the World Health Organization Regional Office for Africa (WHO AFRO) and its partners created the WHO AFRO Stepwise Laboratory (Quality) Improvement Process Towards Accreditation (SLIPTA) program. WHO AFRO defined a governance structure with roles and responsibilities for six main stakeholders. Laboratories were evaluated by auditors trained and certified by the African Society for Laboratory Medicine. Laboratory performance was measured using the WHO AFRO SLIPTA scoring checklist and recognition certificates rated with 1-5 stars were issued. By March 2015, 27 of the 47 (57%) WHO AFRO member states had appointed a SLIPTA focal point and 14 Ministers of Health had endorsed SLIPTA as the desired programme for continuous quality improvement. Ninety-eight auditors from 17 African countries, competent in the Portuguese (3), French (12) and English (83) languages, were trained and certified. The mean score for the 159 laboratories audited between May 2013 and March 2015 was 69% (median 70%; SD 11.5; interquartile range 62-77). Of these audited laboratories, 70% achieved 55% compliance or higher (2 or more stars) and 1% scored at least 95% (5 stars). The lowest scoring sections of the WHO AFRO SLIPTA checklist were sections 6 (Internal Audit) and 10 (Corrective Action), which both had mean scores below 50%. The WHO AFRO SLIPTA is a process that countries with limited resources can adopt for effective implementation of quality management systems. Political commitment, ownership and investment in continuous quality improvement are integral components of the process.

  17. Energy-efficient buildings program evaluations. Volume 1: Findings and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Mayi, D.; Edgemon, S.D.

    1997-04-01

    This study was conducted for the US Department of Energy (DOE) by Pacific Northwest National Laboratory (PNNL). DOE operates the Building Standards and Guidelines Program (BSGP) to increase the effectiveness of building energy codes, standards, and guidelines. The main purpose of this report is to lay the groundwork for conducting an overall evaluation of the program and its effectiveness. Another purpose of this report is to summarize an extensive set of relevant evaluations and provide a building efficiency and program evaluation information resource for program designers, managers, and evaluators. This study presents information from 119 evaluations that have been conducted of both utility and code programs related to energy efficiency in new residential and commercial buildings. The authors used the information in these evaluations to identify major themes and lessons learned from utility and code programs. They also used the information to gain insights into appropriate evaluation methodologies and establish guidelines for designing future evaluations and an evaluation of the BSGP. The report presents general lessons about evaluating programs that have implications for future evaluations included the following. The evaluations provided the basis for developing an effective evaluation approach for residential building energy-efficiency codes and other energy-efficiency programs and other insights for conducting commercial building program evaluations. The findings for conducting effective evaluations are categorized by steps in the evaluation process.

  18. LANL seismic screening method for existing buildings

    International Nuclear Information System (INIS)

    Dickson, S.L.; Feller, K.C.; Fritz de la Orta, G.O.

    1997-01-01

    The purpose of the Los Alamos National Laboratory (LANL) Seismic Screening Method is to provide a comprehensive, rational, and inexpensive method for evaluating the relative seismic integrity of a large building inventory using substantial life-safety as the minimum goal. The substantial life-safety goal is deemed to be satisfied if the extent of structural damage or nonstructural component damage does not pose a significant risk to human life. The screening is limited to Performance Category (PC) -0, -1, and -2 buildings and structures. Because of their higher performance objectives, PC-3 and PC-4 buildings automatically fail the LANL Seismic Screening Method and will be subject to a more detailed seismic analysis. The Laboratory has also designated that PC-0, PC-1, and PC-2 unreinforced masonry bearing wall and masonry infill shear wall buildings fail the LANL Seismic Screening Method because of their historically poor seismic performance or complex behavior. These building types are also recommended for a more detailed seismic analysis. The results of the LANL Seismic Screening Method are expressed in terms of separate scores for potential configuration or physical hazards (Phase One) and calculated capacity/demand ratios (Phase Two). This two-phase method allows the user to quickly identify buildings that have adequate seismic characteristics and structural capacity and screen them out from further evaluation. The resulting scores also provide a ranking of those buildings found to be inadequate. Thus, buildings not passing the screening can be rationally prioritized for further evaluation. For the purpose of complying with Executive Order 12941, the buildings failing the LANL Seismic Screening Method are deemed to have seismic deficiencies, and cost estimates for mitigation must be prepared. Mitigation techniques and cost-estimate guidelines are not included in the LANL Seismic Screening Method

  19. Building Co-Management as a Process: Problem Solving Through Partnerships in Aboriginal Country, Australia

    Science.gov (United States)

    Zurba, Melanie; Ross, Helen; Izurieta, Arturo; Rist, Philip; Bock, Ellie; Berkes, Fikret

    2012-06-01

    Collaborative problem solving has increasingly become important in the face of the complexities in the management of resources, including protected areas. The strategy undertaken by Girringun Aboriginal Corporation in north tropical Queensland, Australia, for developing co-management demonstrates the potential for a problem solving approach involving sequential initiatives, as an alternative to the more familiar negotiated agreements for co-management. Our longitudinal case study focuses on the development of indigenous ranger units as a strategic mechanism for the involvement of traditional owners in managing their country in collaboration with government and other interested parties. This was followed by Australia's first traditional use of marine resources agreement, and development of a multi-jurisdictional, land to sea, indigenous protected area. In using a relationship building approach to develop regional scale co-management, Girringun has been strengthening its capabilities as collaborator and regional service provider, thus, bringing customary decision-making structures into play to `care for country'. From this evolving process we have identified the key components of a relationship building strategy, `the pillars of co-management'. This approach includes learning-by-doing, the building of respect and rapport, sorting out responsibilities, practical engagement, and capacity-building.

  20. Technology roadmap for development of SiC sensors at plasma processes laboratory

    Directory of Open Access Journals (Sweden)

    Mariana Amorim Fraga

    2010-08-01

    Full Text Available Recognizing the need to consolidate the research and development (R&D activities in microelectronics fields in a strategic manner, the Plasma Processes Laboratory of the Technological Institute of Aeronautics (LPP-ITA has established a technology roadmap to serve as a guide for activities related to development of sensors based on silicon carbide (SiC thin films. These sensors have also potential interest to the aerospace field due to their ability to operate in harsh environment such as high temperatures and intense radiation. In the present paper, this roadmap is described and presented in four main sections: i introduction, ii what we have already done in the past, iii what we are doing in this moment, and iv our targets up to 2015. The critical technological issues were evaluated for different categories: SiC deposition techniques, SiC processing techniques for sensors fabrication and sensors characterization. This roadmap also presents a shared vision of how R&D activities in microelectronics should develop over the next five years in our laboratory.

  1. Transforming the Learning Environment of Undergraduate Physics Laboratories to Enhance Physics Inquiry Processes

    Directory of Open Access Journals (Sweden)

    Gregory P. Thomas

    2017-04-01

    Full Text Available Concerns persist regarding the lack of promotion of students’ scientific inquiry processes in undergraduate physics laboratories. The consensus in the literature is that, especially in the early years of undergraduate physics programs, students’ laboratory work is characterized by recipe type, step-by-step instructions for activities where the aim is often confirmation of an already well-established physics principle or concept. In response to evidence reflecting these concerns at their university, the authors successfully secured funding for this study. A mixed-method design was employed. In the 2011/2012 academic year baseline data were collected. A quantitative survey, the Undergraduate Physics Laboratory Learning Environment Scale (UPLLES was developed, validated, and used to explore students’ perceptions of their physics laboratory environments. Analysis of data from the UPLLES and from interviews confirmed the concerns evident in the literature and in a previous evaluation of laboratories undertaken in 2002. To address these concerns the activities that students were to perform in the laboratory section of the course/s were re/designed to engage students in more inquiry oriented thinking and activity. In Fall 2012, the newly developed laboratory activities and tutorials, were implemented for the first time in PHYS124; a first year course. These changes were accompanied by structured training of teaching assistants and changes to the structure of the evaluation of students’ laboratory performance. At the end of that term the UPLLES was administered (n = 266 and interviews with students conducted (n = 16 to explore their perceptions of their laboratory environments. Statistically significant differences (p<.001 between the students in the PHYS 124 classes of 2011/2012 and 2012/2013 across all dimensions were found. Effect sizes of 0.82 to 1.3, between the views of students in the first semester physics classes of 2011/2012 and 2012

  2. Decreasing troponin turnaround time in the emergency department using the central laboratory: A process improvement study.

    Science.gov (United States)

    Boelstler, Arlene M; Rowland, Ralph; Theoret, Jennifer; Takla, Robert B; Szpunar, Susan; Patel, Shraddha P; Lowry, Andrew M; Pena, Margarita E

    2015-03-01

    To implement collaborative process improvement measures to reduce emergency department (ED) troponin turnaround time (TAT) to less than 60min using central laboratory. This was an observational, retrospective data study. A multidisciplinary team from the ED and laboratory identified opportunities and developed a new workflow model. Process changes were implemented in ED patient triage, staffing, lab collection and processing. Data collected included TAT of door-to-order, order-to-collect, collect-to-received, received-to-result, door-to-result, ED length of stay, and hemolysis rate before (January-August, 2011) and after (September 2011-June 2013) process improvement. After process improvement and implementation of the new workflow model, decreased median TAT (in min) was seen in door-to-order (54 [IQR43] vs. 11 [IQR20]), order-to-collect (15 [IQR 23] vs. 10 [IQR12]), collect-to-received (6 [IQR8] vs. 5 [IQR5]), received-to-result (30 [IQR12] vs. 24 [IQR11]), and overall door-to-result (117 [IQR60] vs. 60 [IQR40]). A troponin TAT of <60min was realized beginning in May 2012 (59 [IQR39]). Hemolysis rates decreased (14.63±0.74 vs. 3.36±1.99, p<0.0001), as did ED length of stay (5.87±2.73h vs. 5.15±2.34h, p<0.0001). Conclusion Troponin TAT of <60min using a central laboratory was achieved with collaboration between the ED and the laboratory; additional findings include a decreased ED length of stay. Copyright © 2014 The Canadian Society of Clinical Chemists. Published by Elsevier Inc. All rights reserved.

  3. Implementation of the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation

    Directory of Open Access Journals (Sweden)

    Jean-Bosco Ndihokubwayo

    2016-05-01

    SLIPTA implementation process: WHO AFRO defined a governance structure with roles and responsibilities for six main stakeholders. Laboratories were evaluated by auditors trained and certified by the African Society for Laboratory Medicine. Laboratory performance was measured using the WHO AFRO SLIPTA scoring checklist and recognition certificates rated with 1–5 stars were issued. Preliminary results: By March 2015, 27 of the 47 (57% WHO AFRO member states had appointed a SLIPTA focal point and 14 Ministers of Health had endorsed SLIPTA as the desired programme for continuous quality improvement. Ninety-eight auditors from 17 African countries, competent in the Portuguese (3, French (12 and English (83 languages, were trained and certified. The mean score for the 159 laboratories audited between May 2013 and March 2015 was 69% (median 70%; SD 11.5; interquartile range 62–77. Of these audited laboratories, 70% achieved 55% compliance or higher (2 or more stars and 1% scored at least 95% (5 stars. The lowest scoring sections of the WHO AFRO SLIPTA checklist were sections 6 (Internal Audit and 10 (Corrective Action, which both had mean scores below 50%. Conclusion: The WHO AFRO SLIPTA is a process that countries with limited resources can adopt for effective implementation of quality management systems. Political commitment, ownership and investment in continuous quality improvement are integral components of the process.

  4. Metals Processing Laboratory Users (MPLUS) Facility Annual Report FY 2002 (October 1, 2001-September 30, 2002)

    Energy Technology Data Exchange (ETDEWEB)

    Angelini, P

    2004-04-27

    The Metals Processing Laboratory Users Facility (MPLUS) is a Department of Energy (DOE), Energy Efficiency and Renewable Energy, Industrial Technologies Program, user facility designated to assist researchers in key industries, universities, and federal laboratories in improving energy efficiency, improving environmental aspects, and increasing competitiveness. The goal of MPLUS is to provide access to the specialized technical expertise and equipment needed to solve metals processing issues that limit the development and implementation of emerging metals processing technologies. The scope of work can also extend to other types of materials. MPLUS has four primary user centers: (1) Processing--casting, powder metallurgy, deformation processing (including extrusion, forging, rolling), melting, thermomechanical processing, and high-density infrared processing; (2) Joining--welding, monitoring and control, solidification, brazing, and bonding; (3) Characterization--corrosion, mechanical properties, fracture mechanics, microstructure, nondestructive examination, computer-controlled dilatometry, and emissivity; and (4) Materials/Process Modeling--mathematical design and analyses, high-performance computing, process modeling, solidification/deformation, microstructure evolution, thermodynamic and kinetic, and materials databases A fully integrated approach provides researchers with unique opportunities to address technologically related issues to solve metals processing problems and probe new technologies. Access is also available to 16 additional Oak Ridge National Laboratory (ORNL) user facilities ranging from state-of-the-art materials characterization capabilities, and high-performance computing to manufacturing technologies. MPLUS can be accessed through a standardized user-submitted proposal and a user agreement. Nonproprietary (open) or proprietary proposals can be submitted. For open research and development, access to capabilities is provided free of charge

  5. Courthouse Prototype Building

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2018-02-01

    As part of DOE's support of ANSI/ASHRAE/IES Standard 90.1 and IECC, researchers at Pacific Northwest National Laboratory (PNNL) apply a suite of prototype buildings covering 80% of the commercial building floor area in the U.S. for new construction. Efforts have started on expanding the prototype building suite to cover 90% of the commercial building floor area in the U.S., by developing prototype models for additional building types including place of worship, public order and safety, public assembly. Courthouse is courthouse is a sub-category under the “Public Order and Safety" building type category; other sub-categories include police station, fire station, and jail, reformatory or penitentiary.ORNL used building design guides, databases, and documented courthouse projects, supplemented by personal communication with courthouse facility planning and design experts, to systematically conduct research on the courthouse building and system characteristics. This report documents the research conducted for the courthouse building type and proposes building and system characteristics for developing a prototype building energy model to be included in the Commercial Building Prototype Model suite. According to the 2012 CBECS, courthouses occupy a total of 436 million sqft of floor space or 0.5% of the total floor space in all commercial buildings in the US, next to fast food (0.35%), grocery store or food market (0.88%), and restaurant or cafeteria (1.2%) building types currently included in the Commercial Prototype Building Model suite. Considering aggregated average, courthouse falls among the larger with a mean floor area of 69,400 sqft smaller fuel consumption intensity building types and an average of 94.7 kBtu/sqft compared to 77.8 kBtu/sqft for office and 80 kBtu/sqft for all commercial buildings.Courthouses range in size from 1000 sqft to over a million square foot building gross square feet and 1 courtroom to over 100 courtrooms. Small courthouses

  6. The Virtual Product-Process Design Laboratory for Structured Chemical Product Design and Analysis

    DEFF Research Database (Denmark)

    Mattei, Michele; Yunus, Nor Alafiza Binti; Kalakul, Sawitree

    2014-01-01

    The objective of this paper is to present new methods for design of chemicals based formulated products and their implementation in the software, the Virtual Product-Process Design Laboratory. The new products are tailor-made blended liquid products and emulsion-based products. The new software...

  7. The coupled process laboratory test of highly compacted bentonite

    International Nuclear Information System (INIS)

    Shen Zhenyao; Li Guoding; Li Shushen; Wang Chengzu

    2004-01-01

    Highly compacted bentonite blocks have been heated and hydrated in the laboratory in order to simulate the thermo-hydro-mechanical (THM) coupled processes of buffer material in a high-level radioactive waste (HLW) repository. The experiment facility, which is composed of experiment barrel, heated system, high pressure water input system, temperature measure system, water content measure system and swelling stress system, is introduced in this paper. The steps of the THM coupled experiment are also given out in detail. There are total 10 highly compacted bentonite blocks used in this test. Experimental number 1-4 are the tests with the heater and the hydrated process, which temperature distribution vs. time and final moisture distribution are measured. Experimental number 5-8 are the tests with the heater and without the hydrated process, which temperature distribution vs. time and final moisture distribution are measured. Experimental number 9-10 are the tests with the heater and the hydrated process, which temperature distribution vs. time, final moisture distribution and the swelling stress distribution at some typical points vs. time are measured. The maximum test time is nearly 20 days and the minimum test time is only 8 hours. The results show that the temperature field is little affected by hydration process and stress condition, but moisture transport and stress distribution are a little affected by the thermal gradient. The results also show that the water head difference is the mainly driving force of hydration process and the swelling stress is mainly from hydration process. It will great help to understand better about heat and mass transfer in porous media and the THM coupled process in actual HLW disposal. (author)

  8. Application of the Life Cycle Analysis and the Building Information Modelling Software in the Architectural Climate Change-Oriented Design Process

    Science.gov (United States)

    Gradziński, Piotr

    2017-10-01

    Whereas World’s climate is changing (inter alia, under the influence of architecture activity), the author attempts to reorientations design practice primarily in a direction the use and adapt to the climatic conditions. Architectural Design using in early stages of the architectural Design Process of the building, among other Life Cycle Analysis (LCA) and digital analytical tools BIM (Building Information Modelling) defines the overriding requirements which the designer/architect should meet. The first part, the text characterized the architecture activity influences (by consumption, pollution, waste, etc.) and the use of building materials (embodied energy, embodied carbon, Global Warming Potential, etc.) within the meaning of the direct negative environmental impact. The second part, the paper presents the revision of the methods and analytical techniques prevent negative influences. Firstly, showing the study of the building by using the Life Cycle Analysis of the structure (e.g. materials) and functioning (e.g. energy consumptions) of the architectural object (stages: before use, use, after use). Secondly, the use of digital analytical tools for determining the benefits of running multi-faceted simulations in terms of environmental factors (exposure to light, shade, wind) directly affecting shaping the form of the building. The conclusion, author’s research results highlight the fact that indicates the possibility of building design using the above-mentioned elements (LCA, BIM) causes correction, early designs decisions in the design process of architectural form, minimizing the impact on nature, environment. The work refers directly to the architectural-environmental dimensions, orienting the design process of buildings in respect of widely comprehended climatic changes.

  9. Laboratory Exercise: Study of Digestive and Regulatory Processes through the Exploration of Fasted and Postprandial Blood Glucose

    Science.gov (United States)

    Hopper, Mari K.; Maurer, Luke W.

    2013-01-01

    Digestive physiology laboratory exercises often explore the regulation of enzyme action rather than systems physiology. This laboratory exercise provides a systems approach to digestive and regulatory processes through the exploration of postprandial blood glucose levels. In the present exercise, students enrolled in an undergraduate animal…

  10. Study of thermosiphon and radiant panel passive heating systems for metal buildings

    Energy Technology Data Exchange (ETDEWEB)

    Biehl, F.A.; Schnurr, N.M.; Wray, W.O.

    1983-01-01

    A study of passive-heating systems appropriate for use on metal buildings is being conducted at Los Alamos National Laboratory for the Naval Civil Engineering Laboratory, Port Hueneme, California. The systems selected for study were chosen on the basis of their appropriateness for retrofit applications, although they are also suitable for new construction: simple radiant panels that communicate directly with the building interior and a backflow thermosiphon that provides heat indirectly.

  11. Cleanup of building 3019 and surroundings at ORNL following plutonium release of November 20, 1959

    International Nuclear Information System (INIS)

    Parrott, J.R. Sr.

    1981-01-01

    A non-nuclear explosion involving an evaporator occurred in a shielded cell in the Radiochemical Processing Pilot Plant at Oak Ridge National Laboratory on November 20, 1959. Plutonium was released, probably as an aerosol of fine particles of plutonium oxide, via three principal routes: (1) cell ventilation system: collected about 1.5 g, completely removed from the air stream by roughing and absolute filters; (2) the cell door was blown open (but not off) to the outside, releasing approximately 600 mg to a limited area south and east of the building. The Graphite Reactor Building, directly east of Building 3019, was subjected to the highest level of contamination; and (3) pipe passages and service openings through the cell wall resulted in about 70 mg being spread to the building interior. The extent of contamination and the decontamination effort required for resumption of operations is discussed

  12. The makeover of the Lakeshore General Hospital laboratories.

    Science.gov (United States)

    Estioko-Taimuri, Teresa

    2006-01-31

    This article describes the expansion and reorganization of a moderate-sized Canadian laboratory from Day One to "Live Day." The key factors to the success of this project were organized planning by the laboratory staff and the introduction of core lab theories, team building, and organized training sessions. The successful makeover resulted in improved turnaround time for STAT tests, especially those coming from the Emergency Unit. The efforts of the laboratory personnel toward the improvement of laboratory services, in spite of budget, human resources constraints, and resistance to change, are addressed.

  13. The use of portable equipment for the activity concentration index determination of building materials: method validation and survey of building materials on the Belgian market

    International Nuclear Information System (INIS)

    Stals, M.; Verhoeven, S.; Bruggeman, M.; Pellens, V.; Schroeyers, W.; Schreurs, S.

    2014-01-01

    The Euratom BSS requires that in the near future (2015) the building materials for application in dwellings or buildings such as offices or workshops are screened for NORM nuclides. The screening tool is the activity concentration index (ACI). Therefore it is expected that a large number of building materials will be screened for NORM and thus require ACI determination. Nowadays, the proposed standard for determination of building material ACI is a laboratory analyses technique with high purity germanium spectrometry and 21 days equilibrium delay. In this paper, the B-NORM method for determination of building material ACI is assessed as a faster method that can be performed on-site, alternative to the aforementioned standard method. The B-NORM method utilizes a LaBr 3 (Ce) scintillation probe to obtain the spectral data. Commercially available software was applied to comprehensively take into account the factors determining the counting efficiency. The ACI was determined by interpreting the gamma spectrum from 226 Ra and its progeny; 232 Th progeny and 40 K. In order to assess the accuracy of the B-NORM method, a large selection of samples was analyzed by a certified laboratory and the results were compared with the B-NORM results. The results obtained with the B-NORM method were in good correlation with the results obtained by the certified laboratory, indicating that the B-NORM method is an appropriate screening method to assess building material ACI. The B-NORM method was applied to analyze more than 120 building materials on the Belgian market. No building materials that exceed the proposed reference level of 1 mSv/year were encountered. -- Highlights: • Many building materials will have to be tested for NORM activity concentrations. • An on-site NORM analysis method has been developed and validated. • Over 120 building materials on the Belgian market have been analyzed with this method. • The Euratom BSS reference level of 1 mSv/year excess dose will

  14. Refurbishment and school buildings management in a smart building environment

    Science.gov (United States)

    Di Giuda, Giuseppe Martino; Villa, Valentina; Tagliabue, Lavinia Chiara; Giana, Paolo Ettore; Rinaldi, Stefano; Ciribini, Angelo Luigi Camillo

    2018-05-01

    Building Information Modelling is a methodology, which is able to take into account many data, both geometrical and non-geometrical, in order to evaluate at the actual condition of the asset. The project has the scope of evaluating the conditions of different school buildings, in order to develop a way to choose the best-tailored management solution to the owner. A further step is the management and planning of design solutions during the life cycle customized on monitored buildings' conditions. The research work focuses on providing a support decisions concerning the gap between the present building state laws and the current state of the existing buildings. The process will be developed in an expanded BIM environment, using sensors, which will give back the state of the consistency of the actual conditions to enable the buildings to adapt themselves in the best way into their specific constraints and boundaries. The results of the study are (i) a complete workflow to make decision and the possibility to shape the decision process on an objective through a scientific approach, (ii) evaluate the current state of the asset and (iii) manage maintenance in the lifespan. Further development will take in consideration all the aspects related to management of big data environment generated by a smart buildings system.

  15. Moisture dynamics in building envelopes

    Energy Technology Data Exchange (ETDEWEB)

    Peuhkuri, R.

    2003-07-01

    The overall scope of this Thesis 'Moisture dynamics in building envelopes' has been to characterise how the various porous insulation materials investigated performed hygro thermally under conditions similar to those in a typical building envelope. As a result of the changing temperature and moisture conditions in the exterior weather and indoor climate the materials dynamically absorb and release moisture. The complexity of the impact of these conditions on the resulting moisture transport and content of the materials has been studied in this Thesis with controlled laboratory tests. (au)

  16. Neutron and X-ray facilities in new Purnima extension building

    International Nuclear Information System (INIS)

    Sarkar, P.S.; Patel, Tarun; Gadkari, S.C.

    2017-01-01

    Neutron and X-ray Physics Section of Technical Physics Division has laboratories involving X-ray, gamma ray and neutrons in the New Purnima Extension Building (NPEB), behind Purnima Laboratories, BARC. Research activities related to X-ray, Gamma and neutron based detection and imaging for societal, departmental and security applications are being carried out in these laboratories

  17. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    F. Habashi

    2000-06-22

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  18. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Habashi, F.

    2000-01-01

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  19. Federal High Performance and Sustainable Buildings: Guiding Principles for the Laboratory Support Building (LSB)

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2014-09-01

    This report documents the federal Guiding Principles conformance effort for LSB at PNNL. The effort is part of continued progress toward a campus building inventory that is 100% compliant with the Guiding Principles. The report documentation provides a narrative of how the LSB complies with each of the Guiding Principles requirements. These narratives draw from the many sources that are explained in the text and rely on extensive data collection. The descriptions point to each of these sources, providing the reader with specific policies, procedures, and data points.

  20. Challenges and Opportunities To Achieve 50% Energy Savings in Homes: National Laboratory White Papers

    Energy Technology Data Exchange (ETDEWEB)

    Bianchi, M. V. A.

    2011-07-01

    In 2010, researchers from four of the national laboratories involved in residential research (Lawrence Berkeley National Laboratory, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory) were asked to prepare papers focusing on the key longer term research challenges, market barriers, and technology gaps that must be addressed to achieve the longer term 50% saving goal for Building America to ensure coordination with the Building America industry teams who are focusing their research on systems to achieve the near-term 30% savings goal. Although new construction was included, the focus of the effort was on deep energy retrofits of existing homes. This report summarizes the key opportunities, gaps, and barriers identified in the national laboratory white papers.

  1. Applications of neural networks to real-time data processing at the Environmental and Molecular Sciences Laboratory (EMSL)

    International Nuclear Information System (INIS)

    Keller, P.E.; Kouzes, R.T.; Kangas, L.J.

    1993-06-01

    Detailed design of the Environmental and Molecular Sciences Laboratory (EMSL) at the Pacific Northwest Laboratory (PNL) is nearing completion and construction is scheduled to begin later this year. This facility will assist in the environmental restoration and waste management mission at the Hanford Site. This paper identifies several real-time data processing applications within the EMSL where neural networks can potentially be beneficial. These applications include real-time sensor data acquisition and analysis, spectral analysis, process control, theoretical modeling, and data compression

  2. A Buildings Module for the Stochastic Energy Deployment System

    Energy Technology Data Exchange (ETDEWEB)

    Lacommare, Kristina S H; Marnay, Chris; Stadler, Michael; Borgeson, Sam; Coffey, Brian; Komiyama, Ryoichi; Lai, Judy

    2008-05-15

    The U.S. Department of Energy (USDOE) is building a new long-range (to 2050) forecasting model for use in budgetary and management applications called the Stochastic Energy Deployment System (SEDS), which explicitly incorporates uncertainty through its development within the Analytica(R) platform of Lumina Decision Systems. SEDS is designed to be a fast running (a few minutes), user-friendly model that analysts can readily run and modify in its entirety through a visual programming interface. Lawrence Berkeley National Laboratory is responsible for implementing the SEDS Buildings Module. The initial Lite version of the module is complete and integrated with a shared code library for modeling demand-side technology choice developed by the National Renewable Energy Laboratory (NREL) and Lumina. The module covers both commercial and residential buildings at the U.S. national level using an econometric forecast of floorspace requirement and a model of building stock turnover as the basis for forecasting overall demand for building services. Although the module is fundamentally an engineering-economic model with technology adoption decisions based on cost and energy performance characteristics of competing technologies, it differs from standard energy forecasting models by including considerations of passive building systems, interactions between technologies (such as internal heat gains), and on-site power generation.

  3. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    International Nuclear Information System (INIS)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform

  4. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform.

  5. Error prevention at a radon measurement service laboratory

    International Nuclear Information System (INIS)

    Cohen, B.L.; Cohen, F.

    1989-01-01

    This article describes the steps taken at a high volume counting laboratory to avoid human, instrument, and computer errors. The laboratory analyzes diffusion barrier charcoal adsorption canisters which have been used to test homes and commercial buildings. A series of computer and human cross-checks are utilized to assure that accurate results are reported to the correct client

  6. Modernisation of the intermediate physics laboratory

    Science.gov (United States)

    Kontro, Inkeri; Heino, Olga; Hendolin, Ilkka; Galambosi, Szabolcs

    2018-03-01

    The intermediate laboratory courses at the Department of Physics, University of Helsinki, were reformed using desired learning outcomes as the basis for design. The reformed laboratory courses consist of weekly workshops and small-group laboratory sessions. Many of the laboratory exercises are open-ended and have several possible ways of execution. They were designed around affordable devices, to allow for the purchase of multiple sets of laboratory equipment. This allowed students to work on the same problems simultaneously. Thus, it was possible to set learning goals which build on each other. Workshop sessions supported the course by letting the students solve problems related to conceptual and technical aspects of each laboratory exercise. The laboratory exercises progressed biweekly to allow for iterative problem solving. Students reached the learning goals well and the reform improved student experiences. Neither positive or negative changes in expert-like attitudes towards experimental physics (measured by E-CLASS questionnaire) were observed.

  7. Non-Destructive Testing for Building Diagnostics and Monitoring: Experience Achieved with Case Studies

    Directory of Open Access Journals (Sweden)

    Tavukçuoğlu Ayşe

    2018-01-01

    Full Text Available Building inspection on site, in other words in-situ examinations of buildings is a troublesome work that necessitates the use of non-destructive investigation (NDT techniques. One of the main concerns of non-destructive testing studies is to improve in-situ use of NDT techniques for diagnostic and monitoring studies. The quantitative infrared thermography (QIRT and ultrasonic pulse velocity (UPV measurements have distinct importance in that regard. The joint use of QIRT and ultrasonic testing allows in-situ evaluation and monitoring of historical structures and contemporary ones in relation to moisture, thermal, materials and structural failures while the buildings themselves remain intact. For instances, those methods are useful for detection of visible and invisible cracks, thermal bridges and damp zones in building materials, components and functional systems as well as for soundness assessment of materials and thermal performance assessment of building components. In addition, those methods are promising for moisture content analyses in materials and monitoring the success of conservation treatments or interventions in structures. The in-situ NDT studies for diagnostic purposes should start with the mapping of decay forms and scanning of building surfaces with infrared images. Quantitative analyses are shaped for data acquisition on site and at laboratory from representative sound and problem areas in structures or laboratory samples. Laboratory analyses are needed to support in-situ examinations and to establish the reference data for better interpretation of in situ data. Advances in laboratory tests using IRT and ultrasonic testing are guiding for in-situ materials investigations based on measurable parameters. The knowledge and experience on QIRT and ultrasonic testing are promising for the innovative studies on today’s materials technologies, building science and conservation/maintenance practices. Such studies demand a multi

  8. Laboratory-scale dry/wet-milling process for the extraction of starch and gluten from wheat

    NARCIS (Netherlands)

    Steeneken, P.A.M.; Helmens, H.J.

    2009-01-01

    A laboratory-scale process is presented for the manufacture of starch and gluten from wheat. Main feature of this process is that whole wheat kernels are crushed dry between smooth rolls prior to wet disintegration in excess water in such way that gluten formation is prevented and fibres can be

  9. Exploration of a Buried Building Foundation and a Septic Tank Plume Dispersion Using a Laboratory-fabricated Resistivity Apparatus

    Science.gov (United States)

    Lachhab, A.; Stepanik, N.; Booterbaugh, A.

    2010-12-01

    In the following study, an electrical resistivity device was built and used in both a laboratory setup and in the field to accurately identify the location of a septic tank and the foundation of Gustavus Adolphus (GA); a building that was burned at Susquehanna University in 1964. The entire apparatus, which costs a fraction of the price of a typical electrical resistivity device, was tested for accuracy in the laboratory prior to its use in the field. The electrical resistivity apparatus consists of a deep-cycle twelve volt battery, an AC to DC inverter and two multimeters to measure the potential and the current intensity from four linear electrodes via a wireless data transmission system. This apparatus was constructed by using basic inexpensive electrical and electronic equipments. The recorded potential and current values were used to calculate the apparent resistivity of different materials adopting the Wenner array for both investigations. Several tests were performed on the tabletop bench, producing consistent results when applied to find small bricks structures with different geometrical arrangement buried under a mixed sand-soil formation. The apparatus was also used to investigate a subsurface salty water plume in the same formation. The horizontal resistivity profile obtained over the vertical small brick wall matched the theoretical apparent resistivity of resistivity versus displacement on a vertical dike in a homogeneous material. In addition, the two-dimensional resistivity profile replicate the salty plume size conformably. Following the success on the small-scale laboratory tabletop bench, the electrical resistivity apparatus was implemented in the field to explore the foundation of GA in one location and the septic tank in another. An array of transects were performed, analyzed and plotted using MATLAB. The three dimensional contours of apparent resistivity depicted exactly the locations of the buried foundation walls, the septic tank and the

  10. The performance of the remote analytical laboratory during the first fluorinel dissolution process campaign

    International Nuclear Information System (INIS)

    Lewis, L.C.; Henscheid, J.P.

    1989-01-01

    The Remote Analytical Laboratory at the Idaho Chemical Processing Plant was designed to provide analytical chemistry support to the irradiated fuel processing and associated waste processing operations. The facility was put into radioactive operation on July 7, 1986, and operated for more than a year during the first fluorinel fuel dissolution process campaign. The facility incorporated a number of innovative features and was equipped with state-of-the-art analytical instrumentation. The success of the facility is a direct function of how well the remote analytical equipment performed. The performance is discussed in this article

  11. Radiological Characterization and Final Facility Status Report Tritium Research Laboratory

    International Nuclear Information System (INIS)

    Garcia, T.B.; Gorman, T.P.

    1996-08-01

    This document contains the specific radiological characterization information on Building 968, the Tritium Research Laboratory (TRL) Complex and Facility. We performed the characterization as outlined in its Radiological Characterization Plan. The Radiological Characterization and Final Facility Status Report (RC ampersand FFSR) provides historic background information on each laboratory within the TRL complex as related to its original and present radiological condition. Along with the work outlined in the Radiological Characterization Plan (RCP), we performed a Radiological Soils Characterization, Radiological and Chemical Characterization of the Waste Water Hold-up System including all drains, and a Radiological Characterization of the Building 968 roof ventilation system. These characterizations will provide the basis for the Sandia National Laboratory, California (SNL/CA) Site Termination Survey .Plan, when appropriate

  12. Design assessment for the Bethel Valley FFA Upgrades at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This report describes the proposed upgrades to Building 3025 and the Evaporator Area at Oak Ridge National Laboratory. Design assessments, specifications and drawings are provided. Building 3025 is a general purpose research facility utilized by the Materials and Ceramics Division to conduct research on irradiated materials. The Evaporator Area, building 2531, serves as the collection point for all low-level liquid wastes generated at the Oak Ridge National Laboratory

  13. Metrics for building performance assurance

    Energy Technology Data Exchange (ETDEWEB)

    Koles, G.; Hitchcock, R.; Sherman, M.

    1996-07-01

    This report documents part of the work performed in phase I of a Laboratory Directors Research and Development (LDRD) funded project entitled Building Performance Assurances (BPA). The focus of the BPA effort is to transform the way buildings are built and operated in order to improve building performance by facilitating or providing tools, infrastructure, and information. The efforts described herein focus on the development of metrics with which to evaluate building performance and for which information and optimization tools need to be developed. The classes of building performance metrics reviewed are (1) Building Services (2) First Costs, (3) Operating Costs, (4) Maintenance Costs, and (5) Energy and Environmental Factors. The first category defines the direct benefits associated with buildings; the next three are different kinds of costs associated with providing those benefits; the last category includes concerns that are broader than direct costs and benefits to the building owner and building occupants. The level of detail of the various issues reflect the current state of knowledge in those scientific areas and the ability of the to determine that state of knowledge, rather than directly reflecting the importance of these issues; it intentionally does not specifically focus on energy issues. The report describes work in progress and is intended as a resource and can be used to indicate the areas needing more investigation. Other reports on BPA activities are also available.

  14. Decontamination and decommissioning of the Argonne National Laboratory East Area radioactively contaminated surplus facilities: Final report

    International Nuclear Information System (INIS)

    Kline, W.H.; Fassnacht, G.F.; Moe, H.J.

    1987-07-01

    ANL has decontaminated and decommissioned (D and D) seven radiologically contaminated surplus facilities at its Illinois site: a ''Hot'' Machine Shop (Building 17) and support facilities; Fan House No. 1 (Building 37), Fan House No. 2 (Building 38), the Pangborn Dust Collector (Building 41), and the Industrial Waste Treatment Plant (Building 34) for exhaust air from machining of radioactive materials. Also included were a Nuclear Materials Storage Vault (Building 16F) and a Nuclear Research Laboratory (Building 22). The D and D work involved dismantling of all process equipment and associated plumbing, ductwork, drain lines, etc. After radiation surveys, floor and wall coverings, suspended ceilings, room partitions, pipe, conduit and electrical gear were taken down as necessary. In addition, underground sewers were excavated. The grounds around each facility were also thoroughly surveyed. Contaminated materials and soil were packaged and shipped to a low-level waste burial site, while nonactive debris was buried in the ANL landfill. Clean, reusable items were saved, and clean metal scrap was sold for salvage. After the decommissioning work, each building was torn down and the site relandscaped. The project was completed in 1985, ahead of schedule, with substantial savings

  15. Investigation of innovative thermochemical energy storage processes and materials for building applications

    OpenAIRE

    Aydin, Devrim

    2016-01-01

    In this study, it is aimed to develop an innovative thermochemical energy storage system through material, reactor and process based investigations for building space heating applications. The developed system could be integrated with solar thermal collectors, photovoltaic panels or heat pumps to store any excess energy in the form of heat for later use. Thereby, it is proposed to address the problem of high operational costs and CO2 emissions released by currently used fossil fuel based heat...

  16. Development of a methodology for defining whole-building energy design targets for commercial buildings: Phase 2, Development concept stage report

    Energy Technology Data Exchange (ETDEWEB)

    Jones, J.W. (American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Atlanta, GA (USA)); Deringer, J.J. (Deringer Group, Riva, MD (USA)); Hall, J.D. (American Inst. of Architects, Washington, DC (USA)) (comps.)

    1990-09-01

    The Whole-Building Energy Design Targets project is being conducted for the US Department of Energy (DOE) by the Pacific Northwest Laboratory (PNL). The objective of the project is to develop a flexible methodology for setting energy performance guidelines with which architects, engineers, planners, and owners can assess energy efficiency in commercial building design. This volume, the third in the four-volume report on the Targets project concept stage, contains the minutes of the workshops as well as summaries of the expert's written comments prepared at the close of each workshop. In Section 2, the building energy simulation workshop is summarized. Section 3 provides a summary of the building cost workshop.

  17. Project of an integrated calibration laboratory of instruments at IPEN; Projeto de um laboratorio integrado de calibracao de instrumentos no IPEN

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Gustavo Adolfo San Jose

    2009-07-01

    The Calibration Laboratory of Instruments of Instituto de Pesquisas Energeticas e Nucleares offers calibration services of radiation detectors used in radioprotection, diagnostic radiology and radiotherapy, for IPEN and for external facilities (public and private). One part of its facilities is located in the main building, along with other laboratories and study rooms, and another part in an isolated building called Bunker. For the optimization, modernization and specially the safety, the laboratories in the main building shall be transferred to an isolated place. In this work, a project of an integrated laboratory for calibration of instruments was developed, and it will be an expansion of the current Calibration Laboratory of Instruments of IPEN. Therefore, a series of radiometric monitoring of the chosen localization of the future laboratory was realized, and all staff needs (dimensions and disposition of the study rooms and laboratories) were defined. In this project, the laboratories with X ray equipment, alpha and beta radiation sources were located at an isolated part of the building, and the wall shielding was determined, depending on the use of each laboratory. (author)

  18. Pinellas Plant facts. [Products, processes, laboratory facilities

    Energy Technology Data Exchange (ETDEWEB)

    1986-09-01

    This plant was built in 1956 in response to a need for the manufacture of neutron generators, a principal component in nuclear weapons. The neutron generators consist of a miniaturized linear ion accelerator assembled with the pulsed electrical power supplies required for its operation. The ion accelerator, or neutron tube, requires ultra clean, high vacuum technology: hermetic seals between glass, ceramic, glass-ceramic, and metal materials: plus high voltage generation and measurement technology. The existence of these capabilities at the Pinellas Plant has led directly to the assignment of the lightning arrester connector, specialty capacitor, vacuum switch, and crystal resonator. Active and reserve batteries and the radioisotopically-powered thermoelectric generator draw on the materials measurement and controls technologies which are required to ensure neutron generator life. A product development and production capability in alumina ceramics, cermet (electrical) feedthroughs, and glass ceramics has become a specialty of the plant; the laboratories monitor the materials and processes used by the plant's commercial suppliers of ferroelectric ceramics. In addition to the manufacturing facility, a production development capability is maintained at the Pinellas Plant.

  19. Influence of building materials process technology on radon exhalation

    International Nuclear Information System (INIS)

    Liu Fudong; Wang Chunhong; Liu Senlin; Ji Dong; Zhang Yonggui; Pan Ziqiang

    2009-01-01

    The building materials were produced through changing raw material ingredient, baking temperature, pressure difference between surface and interior of building material, grain diameter etc. Experiment indicates that change of raw material ingredient ratio can obviously influence the radon exhalation from building material, followed by baking temperature; and pressure difference does not have significant influence on radon exhalation. For the factory to produce shale-brick, the radon exhalation is relatively low under the condition that coal gangue accounts for 40%-50%, the grain diameter is less than 2 mm, the baking temperature is about 960 degree C or 1 020 degree C and the pressure difference is 85 kPa. (authors)

  20. Laboratory Simulations of Martian and Venusian Aeolian Processes

    Science.gov (United States)

    Greeley, Ronald

    1999-01-01

    With the flyby of the Neptune system by Voyager, the preliminary exploration of the Solar System was accomplished. Data have been returned for all major planets and satellites except the Pluto system. Results show that the surfaces of terrestrial planets and satellites have been subjected to a wide variety of geological processes. On solid- surface planetary objects having an atmosphere, aeolian processes are important in modifying their surfaces through the redistribution of fine-grained material by the wind. Bedrock may be eroded to produce particles and the particles transported by wind for deposition in other areas. This process operates on Earth today and is evident throughout the geological record. Aeolian processes also occur on Mars, Venus, and possibly Titan and Triton, both of which are outer planet satellites that have atmospheres. Mariner 9 and Viking results show abundant wind-related landforms on Mars, including dune fields and yardangs (wind-eroded hills). On Venus, measurements made by the Soviet Venera and Vega spacecraft and extrapolations from the Pioneer Venus atmospheric probes show that surface winds are capable of transporting particulate materials and suggest that aeolian processes may operate on that planet as well. Magellan radar images of Venus show abundant wind streaks in some areas, as well as dune fields and a zone of possible yardangs. The study of planetary aeolian processes must take into account diverse environments, from the cold, low-density atmosphere of Mars to the extremely hot, high- density Venusian atmosphere. Factors such as threshold wind speeds (minimum wind velocity needed to move particles), rates of erosion and deposition, trajectories of windblown particles, and aeolian flow fields over various landforms are all important aspects of the problem. In addition, study of aeolian terrains on Earth using data analogous to planetary data-collection systems is critical to the interpretation of spacecraft information and

  1. Process in Developing Zebra fish Laboratory at Malaysian Nuclear Agency for Toxicology Studies

    International Nuclear Information System (INIS)

    Fazliana Mohd Saaya; Mohd Noor Hidayat Adenan; Anee Suryani Sued

    2015-01-01

    Toxicology is a branch of the very important especially in determining the safety and effectiveness of herbal products to avoid any side effects to the user. Currently, toxicity tests conducted in the laboratory is testing the toxicity of shrimp, tests on cell cultures and experimental animal tests on the rats. One of the most recent exam easier and can reduce the use of experimental rats was testing on zebra fish fish. Fish zebra fish Danio rerio, suitable for the study of toxicity, teratogenicity, genetic, oncology and neurobiology. Zebra fish system of aquarium fish zebra fish system has been in Nuclear Malaysia since 2013 but has not yet fully operational due to several factors and is in the process of moving into a new laboratory which systematically and in accordance with the enabling environment for care. The development of a new fully equipped laboratory is expected to benefit all for use in research. (author)

  2. Clearance Laboratory - Capability and measurement sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Hedemann Jensen, P.; Lauridsen, B.; Silva, J.; Soegaard-Hansen, J.; Warming, L.

    2005-08-01

    A new low-level Clearance Laboratory has been built at the Risoe-site. Building materials with a low content of naturally occurring radionuclides have been used. To minimize transport of radon gas from soil into the laboratory the foundation has been supplied with a membrane. The laboratory has been equipped with two high-efficiency germanium detectors. These detectors will be used for clearance measurements on the predicted amount of 15,000 - 18,000 tonnes of non-active or nearly non-active materials, which will originate from the decommissioning of all the nuclear facilities at the Risoe-site. They will be used also for clearance measurements on buildings and land. Objects and materials to be measured for clearance are placed on a rotation table that can carry up to one tonne and can rotate once a minute to simulate some averaging of inhomogeneously distributed activity. Sensitivity and background measurements reveal that measuring times of 20 - 50 minutes would normally be sufficient to detect radionuclide concentrations of only a small fraction of the nuclide-specific clearance levels with a sufficiently low uncertainty. Probability calculations of the measurement capacity of the Clearance Laboratory indicate that the mean value of the total measuring time for all materials that potentially can be cleared would be 13 years with a 95% probability of being less than 25 years. The mean value of the annual amount of materials that can be measured in the laboratory is 600 tonnes with a 95% probability of being less than 1,200 tonnes. If needed, there is room for additional measuring systems to increase the capacity of the laboratory. (au)

  3. Clearance Laboratory - Capability and measurement sensitivity

    International Nuclear Information System (INIS)

    Hedemann Jensen, P.; Lauridsen, B.; Silva, J.; Soegaard-Hansen, J.; Warming, L.

    2005-09-01

    A new low-level Clearance Laboratory has been built at the Risoe-site. Building materials with a low content of naturally occurring radionuclides have been used. To minimize transport of radon gas from soil into the laboratory the foundation has been supplied with a membrane. The laboratory has been equipped with two high-efficiency germanium detectors. These detectors will be used for clearance measurements on the predicted amount of 15,000 - 18,000 tonnes of non-active or nearly non-active materials, which will originate from the decommissioning of all the nuclear facilities at the Risoe-site. They will be used also for clearance measurements on buildings and land. Objects and materials to be measured for clearance are placed on a rotation table that can carry up to one tonne and can rotate once a minute to simulate some averaging of inhomogeneously distributed activity. Sensitivity and background measurements reveal that measuring times of 20 - 50 minutes would normally be sufficient to detect radionuclide concentrations of only a small fraction of the nuclide-specific clearance levels with a sufficiently low uncertainty. Probability calculations of the measurement capacity of the Clearance Laboratory indicate that the mean value of the total measuring time for all materials that potentially can be cleared would be 13 years with a 95% probability of being less than 25 years. The mean value of the annual amount of materials that can be measured in the laboratory is 600 tonnes with a 95% probability of being less than 1,200 tonnes. If needed, there is room for additional measuring systems to increase the capacity of the laboratory. (au)

  4. ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Punjabi, S.

    2014-08-01

    In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

  5. Variation of radon exhalation on building materials

    International Nuclear Information System (INIS)

    Liu Fudong; Liu Senlin; Wang Chunhong; Pan Ziqiang; Zhang Yonggui; Ji Dong

    2009-01-01

    The 19 samples from different building material factories were collected for four kinds of building materials. The activity concentration and radon exhalation of building materials were measured. The radon exhalations of building materials are not obviously different if the component is same and the processes of building materials are similar. However, the radon exhalations of same kind of building material are greatly different if the components are different and the processes of building material are varied even if the activity concentrations of building material are similar. (authors)

  6. Development and implementation of the Caribbean Laboratory Quality Management Systems Stepwise Improvement Process (LQMS-SIP) Towards Accreditation.

    Science.gov (United States)

    Alemnji, George; Edghill, Lisa; Guevara, Giselle; Wallace-Sankarsingh, Sacha; Albalak, Rachel; Cognat, Sebastien; Nkengasong, John; Gabastou, Jean-Marc

    2017-01-01

    Implementing quality management systems and accrediting laboratories in the Caribbean has been a challenge. We report the development of a stepwise process for quality systems improvement in the Caribbean Region. The Caribbean Laboratory Stakeholders met under a joint Pan American Health Organization/US Centers for Disease Control and Prevention initiative and developed a user-friendly framework called 'Laboratory Quality Management System - Stepwise Improvement Process (LQMS-SIP) Towards Accreditation' to support countries in strengthening laboratory services through a stepwise approach toward fulfilling the ISO 15189: 2012 requirements. This approach consists of a three-tiered framework. Tier 1 represents the minimum requirements corresponding to the mandatory criteria for obtaining a licence from the Ministry of Health of the participating country. The next two tiers are quality improvement milestones that are achieved through the implementation of specific quality management system requirements. Laboratories that meet the requirements of the three tiers will be encouraged to apply for accreditation. The Caribbean Regional Organisation for Standards and Quality hosts the LQMS-SIP Secretariat and will work with countries, including the Ministry of Health and stakeholders, including laboratory staff, to coordinate and implement LQMS-SIP activities. The Caribbean Public Health Agency will coordinate and advocate for the LQMS-SIP implementation. This article presents the Caribbean LQMS-SIP framework and describes how it will be implemented among various countries in the region to achieve quality improvement.

  7. Defense waste processing facility precipitate hydrolysis process

    International Nuclear Information System (INIS)

    Doherty, J.P.; Eibling, R.E.; Marek, J.C.

    1986-03-01

    Sodium tetraphenylborate and sodium titanate are used to assist in the concentration of soluble radionuclide in the Savannah River Plant's high-level waste. In the Defense Waste Processing Facility, concentrated tetraphenylborate/sodium titanate slurry containing cesium-137, strontium-90 and traces of plutonium from the waste tank farm is hydrolyzed in the Salt Processing Cell forming organic and aqueous phases. The two phases are then separated and the organic phase is decontaminated for incineration outside the DWPF building. The aqueous phase, containing the radionuclides and less than 10% of the original organic, is blended with the insoluble radionuclides in the high-level waste sludge and is fed to the glass melter for vitrification into borosilicate glass. During the Savannah River Laboratory's development of this process, copper (II) was found to act as a catalyst during the hydrolysis reactions, which improved the organic removal and simplified the design of the reactor

  8. Building Energy Management Open Source Software

    Energy Technology Data Exchange (ETDEWEB)

    2017-06-20

    This is the repository for Building Energy Management Open Source Software (BEMOSS), which is an open source operating system that is engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. BEMOSS offers the following key features: (1) Open source, open architecture – BEMOSS is an open source operating system that is built upon VOLTTRON – a distributed agent platform developed by Pacific Northwest National Laboratory (PNNL). BEMOSS was designed to make it easy for hardware manufacturers to seamlessly interface their devices with BEMOSS. Software developers can also contribute to adding additional BEMOSS functionalities and applications. (2) Plug & play – BEMOSS was designed to automatically discover supported load controllers (including smart thermostats, VAV/RTUs, lighting load controllers and plug load controllers) in commercial buildings. (3) Interoperability – BEMOSS was designed to work with load control devices form different manufacturers that operate on different communication technologies and data exchange protocols. (4) Cost effectiveness – Implementation of BEMOSS deemed to be cost-effective as it was built upon a robust open source platform that can operate on a low-cost single-board computer, such as Odroid. This feature could contribute to its rapid deployment in small- or medium-sized commercial buildings. (5) Scalability and ease of deployment – With its multi-node architecture, BEMOSS provides a distributed architecture where load controllers in a multi-floor and high occupancy building could be monitored and controlled by multiple single-board computers hosting BEMOSS. This makes it possible for a building engineer to deploy BEMOSS in one zone of a building, be comfortable with its operation, and later on expand the deployment to the entire building to make it more energy efficient. (6) Ability to provide local and remote monitoring – BEMOSS provides both local and remote monitoring

  9. Rutherford Appleton Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    Rutherford Appleton Laboratory (RAL), described in this document, supports a wide variety of projects. Each year more than 1000 scientists and engineers visit RAL to use its world-class laser and neutron-scattering facilities. RAL staff design and build instruments which circle the Earth in satellites, increasing our understanding of ozone depletion and global warming, of the life cycles of stars and galaxies and, indeed, of the origin of the Universe itself. They work with their academic colleagues at international laboratories such as European Organization for Nuclear Research (CERN), Geneva, where massive underground machines probe the microstructure of the atomic nucleus. Vastly complex calculations are carried out on the design of anti-cancer drugs, for example, using supercomputers at RAL. (author)

  10. Process hazards review of the 904-A trench

    International Nuclear Information System (INIS)

    Snyder, D.E.

    1988-01-01

    The 904-A trench is an enclosed underground concrete containment for high level and low level radioactive waste lines between the main Laboratory Building 773-A and waste storage and shipping Building 776-A. The waste generated in laboratories and other facilities in 773-A flows by gravity into the high level and low level drain lines, which proceed from 773-A through the 904-A trench. The trench ends at 776-2A, where the underground was handling tanks for both high level and low level liquids are located. The trench serves to contain any leaks originating in the drain lines. The trench is sloped downward toward the Building 776-2A pipe gallery. Any liquid collected from the sump can be pumped automatically to a waste tank sampled. The review of the 904-A trench system included a study of the trench and piping itself, as well as a study of the high level and low level drain lines from the laboratories to the trench. The present review emphasized on examination of the hazards involved in chemical reactions in the drain lines, misuse of the drains, and criticality. The following items were examined: Process Hazards Review of the Liquid Waste Collection System, Nuclear Criticality Review of the High Level Drain System, Improvements in the 904-A Trench System, Operating Procedures, and Unusual Incidents

  11. Large-scale experiments for the vulnerability analysis of buildings impacted and intruded by fluviatile torrential hazard processes

    Science.gov (United States)

    Sturm, Michael; Gems, Bernhard; Fuchs, Sven; Mazzorana, Bruno; Papathoma-Köhle, Maria; Aufleger, Markus

    2016-04-01

    In European mountain regions, losses due to torrential hazards are still considerable high despite the ongoing debate on an overall increasing or decreasing trend. Recent events in Austria severely revealed that due to technical and economic reasons, an overall protection of settlements in the alpine environment against torrential hazards is not feasible. On the side of the hazard process, events with unpredictable intensities may represent overload scenarios for existent protection structures in the torrent catchments. They bear a particular risk of significant losses in the living space. Although the importance of vulnerability is widely recognised, there is still a research gap concerning its assessment. Currently, potential losses at buildings due to torrential hazards and their comparison with reinstatement costs are determined by the use of empirical functions. Hence, relations of process intensities and the extent of losses, gathered by the analysis of historic hazard events and the information of object-specific restoration values, are used. This approach does not represent a physics-based and integral concept since relevant and often crucial processes, as the intrusion of the fluid-sediment-mixture into elements at risk, are not considered. Based on these findings, our work is targeted at extending these findings and models of present risk research in the context of an integral, more physics-based vulnerability analysis concept. Fluviatile torrential hazard processes and their impacts on the building envelope are experimentally modelled. Material intrusion processes are thereby explicitly considered. Dynamic impacts are gathered quantitatively and spatially distributed by the use of a large set of force transducers. The experimental tests are accomplished with artificial, vertical and skewed plates, including also openings for material intrusion. Further, the impacts on specific buildings within the test site of the work, the fan apex of the Schnannerbach

  12. Topology Optimization for Reducing Additive Manufacturing Processing Distortions

    Science.gov (United States)

    2017-12-01

    distribution is unlimited. 1. Introduction Additive manufacturing (AM) is a production method that involves gradual, layer- by-layer building of material... design space—allowing the production of pre- viously unmanufacturable topologically optimized structures—constraints remain. One constraint, for...ARL-TR-8242•DEC 2017 US Army Research Laboratory Topology Optimization for ReducingAdditive Manufacturing ProcessingDistortions by Raymond A Wildman

  13. A review of laboratory and numerical modelling in volcanology

    Directory of Open Access Journals (Sweden)

    J. L. Kavanagh

    2018-04-01

    Full Text Available Modelling has been used in the study of volcanic systems for more than 100 years, building upon the approach first applied by Sir James Hall in 1815. Informed by observations of volcanological phenomena in nature, including eye-witness accounts of eruptions, geophysical or geodetic monitoring of active volcanoes, and geological analysis of ancient deposits, laboratory and numerical models have been used to describe and quantify volcanic and magmatic processes that span orders of magnitudes of time and space. We review the use of laboratory and numerical modelling in volcanological research, focussing on sub-surface and eruptive processes including the accretion and evolution of magma chambers, the propagation of sheet intrusions, the development of volcanic flows (lava flows, pyroclastic density currents, and lahars, volcanic plume formation, and ash dispersal. When first introduced into volcanology, laboratory experiments and numerical simulations marked a transition in approach from broadly qualitative to increasingly quantitative research. These methods are now widely used in volcanology to describe the physical and chemical behaviours that govern volcanic and magmatic systems. Creating simplified models of highly dynamical systems enables volcanologists to simulate and potentially predict the nature and impact of future eruptions. These tools have provided significant insights into many aspects of the volcanic plumbing system and eruptive processes. The largest scientific advances in volcanology have come from a multidisciplinary approach, applying developments in diverse fields such as engineering and computer science to study magmatic and volcanic phenomena. A global effort in the integration of laboratory and numerical volcano modelling is now required to tackle key problems in volcanology and points towards the importance of benchmarking exercises and the need for protocols to be developed so that models are routinely tested against real

  14. A review of laboratory and numerical modelling in volcanology

    Science.gov (United States)

    Kavanagh, Janine L.; Engwell, Samantha L.; Martin, Simon A.

    2018-04-01

    Modelling has been used in the study of volcanic systems for more than 100 years, building upon the approach first applied by Sir James Hall in 1815. Informed by observations of volcanological phenomena in nature, including eye-witness accounts of eruptions, geophysical or geodetic monitoring of active volcanoes, and geological analysis of ancient deposits, laboratory and numerical models have been used to describe and quantify volcanic and magmatic processes that span orders of magnitudes of time and space. We review the use of laboratory and numerical modelling in volcanological research, focussing on sub-surface and eruptive processes including the accretion and evolution of magma chambers, the propagation of sheet intrusions, the development of volcanic flows (lava flows, pyroclastic density currents, and lahars), volcanic plume formation, and ash dispersal. When first introduced into volcanology, laboratory experiments and numerical simulations marked a transition in approach from broadly qualitative to increasingly quantitative research. These methods are now widely used in volcanology to describe the physical and chemical behaviours that govern volcanic and magmatic systems. Creating simplified models of highly dynamical systems enables volcanologists to simulate and potentially predict the nature and impact of future eruptions. These tools have provided significant insights into many aspects of the volcanic plumbing system and eruptive processes. The largest scientific advances in volcanology have come from a multidisciplinary approach, applying developments in diverse fields such as engineering and computer science to study magmatic and volcanic phenomena. A global effort in the integration of laboratory and numerical volcano modelling is now required to tackle key problems in volcanology and points towards the importance of benchmarking exercises and the need for protocols to be developed so that models are routinely tested against real world data.

  15. Effects of processing method and moisture history on laboratory fungal resistance of wood-HDPE composites.

    Science.gov (United States)

    Craig M. Clemons; Rebecca E. Ibach

    2004-01-01

    The purpose of this study was to clarify the effects of composite processing and moisture sorption on laboratory fungal resistance of wood-plastic composites. A 2-week water soaking or cyclic boiling-drying procedure was used to infuse moisture into composites made from high-density polyethylene filled with 50 percent wood flour and processed by extrusion, compression...

  16. LAB building a home for scientists

    CERN Document Server

    Fishman, Mark C

    2017-01-01

    Laboratories are both monasteries and space stations, redolent of the great ideas of generations past and of technologies to propel the future. Yet standard lab design has changed only little over recent years. Here Mark Fishman describes how to build labs as homes for scientists, to accommodate not just their fancy tools, but also their personalities. This richly illustrated book explores the roles of labs through history, from the alchemists of the Middle Ages to the chemists of the 19th and 20th centuries, and to the geneticists and structural biologists of today, and then turns to the special features of the laboratories Fishman helped to design in Cambridge, Shanghai, and Basel. Anyone who works in, or plans to build a lab, will enjoy this book, which will encourage them to think about how this special environment drives or impedes their important work.

  17. Building Asphalt Pavement with SBS-based Compound Added Using a Dry Process in Greenland

    DEFF Research Database (Denmark)

    Lee, Hosin; Kim, Yongjoo; Geisler, Nivi

    2009-01-01

    PMA where it is formulated to melt and blend with asphalt quickly during a batch mixing process. The main objectives of this study are to (1) build asphalt pavement using asphalt mixtures with SBS-based compound added using a “dry” process at the batch plant and (2) evaluate its performance under......-based compound seemed to affect the asphalt mix to become more flexible under the heavy loads. By adding SBS-based compound to asphalt mixtures using a “dry” process, it is expected that the pavement would become more resistant to rutting than a typical asphalt mixture used in Greenland while enduring its arctic...

  18. The Sodium Process Facility at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Michelbacher, J.A.; Henslee, S.P.; McDermott, M.D.; Price, J.R.; Rosenberg, K.E.; Wells, P.B.

    1998-01-01

    Argonne National Laboratory-West (ANL-W) has approximately 680,000 liters of raw sodium stored in facilities on site. As mandated by the State of Idaho and the US Department of Energy (DOE), this sodium must be transformed into a stable condition for land disposal. To comply with this mandate, ANL-W designed and built the Sodium Process Facility (SPF) for the processing of this sodium into a dry, sodium carbonate powder. The major portion of the sodium stored at ANL-W is radioactively contaminated. The sodium will be processed in three separate and distinct campaigns: the 290,000 liters of Fermi-1 primary sodium, the 50,000 liters of the Experimental Breeder Reactor-II (EBR-II) secondary sodium, and the 330,000 liters of the EBR-II primary sodium. The Fermi-1 and the EBR-II secondary sodium contain only low-level of radiation, while the EBR-II primary sodium has radiation levels up to 0.5 mSv (50 mrem) per hour at 1 meter. The EBR-II primary sodium will be processed last, allowing the operating experience to be gained with the less radioactive sodium prior to reacting the most radioactive sodium. The sodium carbonate will be disposed of in 270 liter barrels, four to a pallet. These barrels are square in cross-section, allowing for maximum utilization of the space on a pallet, minimizing the required landfill space required for disposal

  19. The Sodium Process Facility at Argonne National Laboratory-West

    Energy Technology Data Exchange (ETDEWEB)

    Michelbacher, J.A.; Henslee, S.P. McDermott, M.D.; Price, J.R.; Rosenberg, K.E.; Wells, P.B.

    1998-07-01

    Argonne National Laboratory-West (ANL-W) has approximately 680,000 liters of raw sodium stored in facilities on site. As mandated by the State of Idaho and the US Department of Energy (DOE), this sodium must be transformed into a stable condition for land disposal. To comply with this mandate, ANL-W designed and built the Sodium Process Facility (SPF) for the processing of this sodium into a dry, sodium carbonate powder. The major portion of the sodium stored at ANL-W is radioactively contaminated. The sodium will be processed in three separate and distinct campaigns: the 290,000 liters of Fermi-1 primary sodium, the 50,000 liters of the Experimental Breeder Reactor-II (EBR-II) secondary sodium, and the 330,000 liters of the EBR-II primary sodium. The Fermi-1 and the EBR-II secondary sodium contain only low-level of radiation, while the EBR-II primary sodium has radiation levels up to 0.5 mSv (50 mrem) per hour at 1 meter. The EBR-II primary sodium will be processed last, allowing the operating experience to be gained with the less radioactive sodium prior to reacting the most radioactive sodium. The sodium carbonate will be disposed of in 270 liter barrels, four to a pallet. These barrels are square in cross-section, allowing for maximum utilization of the space on a pallet, minimizing the required landfill space required for disposal.

  20. Effects of delayed laboratory processing on platelet serotonin levels.

    Science.gov (United States)

    Sanner, Jennifer E; Frazier, Lorraine; Udtha, Malini

    2013-01-01

    Despite the availability of established guidelines for measuring platelet serotonin, these guidelines may be difficult to follow in a hospital setting where time to processing may vary from sample to sample. The purpose of this study was to evaluate the effect of the time to processing of human blood samples on the stability of the enzyme-linked immunosorbent assay (ELISA) for the determination of platelet serotonin levels in human plasma. Human blood samples collected from a convenience sample of eight healthy volunteers were analyzed to determine platelet serotonin levels from plasma collected in ethylene diamine tetra acetic acid (EDTA) tubes and stored at 4°C for 3 hr, 5 hr, 8 hr, and 12 hr. Refrigeration storage at 4°C for 3 hr, 5 hr, 8 hr, and 12 hr altered the platelet serotonin measurement when compared to immediate processing. The bias for the samples stored at 4°C for 3 hr was 102.3 (±217.39 ng/10(9) platelets), for 5 hr was 200.1 (±132.76 ng/10(9) platelets), for 8 hr was 146.9 (±221.41 ng/10(9) platelets), and for 12 hr was -67.6 (±349.60 ng/10(9) platelets). Results from this study show that accurate measurement of platelet serotonin levels is dependent on time to processing. Researchers should therefore follow a standardized laboratory guideline for obtaining immediate platelet serotonin levels after blood sample collection.