WorldWideScience

Sample records for process control plan

  1. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  2. 242-A Campaign 99-1 process control plan; FINAL

    International Nuclear Information System (INIS)

    LE, E.Q.

    1999-01-01

    242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom

  3. 200 Area effluent treatment facility process control plan 98-02

    International Nuclear Information System (INIS)

    Le, E.Q.

    1998-01-01

    This Process Control Plan (PCP) provides a description of the background information, key objectives, and operating criteria defining Effluent Treatment Facility (ETF) Campaign 98-02 as required per HNF-IP-0931 Section 37, Process Control Plans. Campaign 98-62 is expected to process approximately 18 millions gallons of groundwater with an assumption that the UP-1 groundwater pump will be shut down on June 30, 1998. This campaign will resume the UP-1 groundwater treatment operation from Campaign 97-01. The Campaign 97-01 was suspended in November 1997 to allow RCRA waste in LERF Basin 42 to be treated to meet the Land Disposal Restriction Clean Out requirements. The decision to utilize ETF as part of the selected interim remedial action of the 200-UP-1 Operable Unit is documented by the Declaration of the Record of Decision, (Ecology, EPA and DOE 1997). The treatment method was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), the Hanford Federal Facility Agreement and Consent Order (known as the Tri-Party Agreement or TPA), and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP)

  4. Process for planning and control of software projects using XedroGESPRO

    OpenAIRE

    Jacqueline Marín-Sánchez; José Alejandro Lugo-García; Pedro Yobanis Piñero-Pérez; Alena María Santiesteban-García; Félix Noel Abelardo-Santana; Javier Menéndez-Rizo

    2014-01-01

    The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary infor...

  5. Planning and control of rework in the process industries: a review

    NARCIS (Netherlands)

    Flapper, S.D.P.; Fransoo, J.C.; Broekmeulen, R.A.C.M.; Inderfurth, K.

    2002-01-01

    For all kinds of reasons, rework, i.e. the transformation of products not fulfilling preset specifications into products that do, is an important issue in process industries. Despite a considerable amount of published research on planning and control of rework, and in addition many papers referring

  6. Use of statistic control of the process as part of a quality assurance plan

    International Nuclear Information System (INIS)

    Acosta, S.; Lewis, C.

    2013-01-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality

  7. Strategic planning and managerial control

    OpenAIRE

    Mihaela Ghicajanu

    2004-01-01

    In this paper present relationship among strategic planning and managerial control process. For begin I want present few elements about strategic planning and managerial control in order to identify link inter these elements.

  8. Planning of modern process control systems in processing engineering and power plant engineering. Planung von modernen Prozessleitsystemen in der Verfahrens- und Kraftwerkstechnik

    Energy Technology Data Exchange (ETDEWEB)

    Gilson, W

    1985-01-01

    Correct planning of up-to-date process control systems results in considerable process automation and rationalization. These systems are used in process engineering, in production plants of the chemical industries and in power stations to a growing extent and rapidly reveal their advantages in terms of increased efficiency, improved product quality and reduced maintenance. However, this necessitates to make full and consistent use of the systems' qualities. Lack of experience often result in flows and errors in planning. The VDE und VDI district associations, Frankfurt, selected this subject for this year's discussion in the working group in February/March 1985 in order to provide a comprehensive coverage and demonstration of the field concerned. Experts and interested persons are given information on what facts will have to be observed during all stages in the planning of up-to-date process control systems. The book deals with the following subjects: From the process involved to the structure of the control system; - system specification and system selection; - configuration and project-accompagnying documentation; - trends and prospects exemplified by recent developments.

  9. A Framework for Healthcare Planning and Control

    NARCIS (Netherlands)

    Hans, Elias W.; van Houdenhoven, Mark; Hulshof, P.J.H.; Hall, Randolph

    2012-01-01

    Rising expenditures spur healthcare organizations to organize their processes more efficiently and effectively. Unfortunately, healthcare planning and control lags behind manufacturing planning and control. We analyze existing planning and control concepts or frameworks for healthcare operations

  10. Tank 241-C-106 waste retrieval sluicing system process control plan

    Energy Technology Data Exchange (ETDEWEB)

    Carothers, K.G.

    1998-07-25

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity.

  11. Tank 241-C-106 waste retrieval sluicing system process control plan

    International Nuclear Information System (INIS)

    Carothers, K.G.

    1998-01-01

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity

  12. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  13. Process control plan for 242-A Evaporator Campaign 95-1

    Energy Technology Data Exchange (ETDEWEB)

    Le, E.Q.; Guthrie, M.D.

    1995-05-18

    The wastes from tanks 106-AP, 107-AP, and 106-AW have been selected to be candidate feed wastes for Evaporator Campaign 95-1. The wastes in tank 106-AP and 107-AP are primarily from B-Plant strontium processing and PUREX neutralized cladding removal, respectively. The waste in tank 106-AW originated primarily from the partially concentrated product from 242-A Evaporator Campaign 94-2. Approximately 8.67 million liters of waste from these tanks will be transferred to tank 102-AW during the campaign. Tank 102-AW is the dedicated waste feed tank for the evaporator and currently contains 647,000 liters of processable waste. The purpose of the 242-A Evaporator Campaign 95-1 Process Control Plan (hereafter referred to as PCP) is to certify that the wastes in tanks 106-AP, 107-AP, 102-AW, and 106-AW are acceptable for processing through evaporator and provide a general description of process strategies and activities which will take place during Campaign 95-1. The PCP also summarizes and presents a comprehensive characterization of the wastes in these tanks.

  14. Process control plan for 242-A Evaporator Campaign 95-1

    International Nuclear Information System (INIS)

    Le, E.Q.; Guthrie, M.D.

    1995-01-01

    The wastes from tanks 106-AP, 107-AP, and 106-AW have been selected to be candidate feed wastes for Evaporator Campaign 95-1. The wastes in tank 106-AP and 107-AP are primarily from B-Plant strontium processing and PUREX neutralized cladding removal, respectively. The waste in tank 106-AW originated primarily from the partially concentrated product from 242-A Evaporator Campaign 94-2. Approximately 8.67 million liters of waste from these tanks will be transferred to tank 102-AW during the campaign. Tank 102-AW is the dedicated waste feed tank for the evaporator and currently contains 647,000 liters of processable waste. The purpose of the 242-A Evaporator Campaign 95-1 Process Control Plan (hereafter referred to as PCP) is to certify that the wastes in tanks 106-AP, 107-AP, 102-AW, and 106-AW are acceptable for processing through evaporator and provide a general description of process strategies and activities which will take place during Campaign 95-1. The PCP also summarizes and presents a comprehensive characterization of the wastes in these tanks

  15. A framework for health care planning and control

    NARCIS (Netherlands)

    Hans, Elias W.; van Houdenhoven, Mark; Hulshof, P.J.H.

    Rising expenditures spur health care organizations to organize their processes more efficiently and effectively. Unfortunately, health care planning and control lags far behind manufacturing planning and control. Successful manufacturing planning and control concepts can not be directly copied,

  16. Use of statistic control of the process as part of a quality assurance plan; Empleo del control estadistico de proceso como parte de un plan de aseguramiento de la calidad

    Energy Technology Data Exchange (ETDEWEB)

    Acosta, S.; Lewis, C., E-mail: sacosta@am.gob.ar [Autoridad Regulatoria Nuclear (ARN), Buenos Aires (Argentina)

    2013-07-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality.

  17. Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations

    Science.gov (United States)

    Guillermo A. Mendoza; Roger J. Meimban; Philip A. Araman; William G. Luppold

    1991-01-01

    A log inventory model and a real-time hardwood process simulation model were developed and combined into an integrated production planning and control system for hardwood sawmills. The log inventory model was designed to monitor and periodically update the status of the logs in the log yard. The process simulation model was designed to estimate various sawmill...

  18. Upgrade plan for HANARO control computer system

    International Nuclear Information System (INIS)

    Kim, Min Jin; Kim, Young Ki; Jung, Hwan Sung; Choi, Young San; Woo, Jong Sub; Jun, Byung Jin

    2001-01-01

    A microprocessor based digital control system, the Multi-Loop Controller (MLC), which was chosen to control HANARO, was introduced to the market in early '80s and it had been used to control petrochemical plant, paper mill and Slowpoke reactor in Canada. Due to the development in computer technology, it has become so outdated model and the production of this model was discontinued a few years ago. Hence difficulty in acquiring the spare parts is expected. To achieve stable reactor control during its lifetime and to avoid possible technical dependency to the manufacturer, a long-term replacement plan for HANARO control computer system is on its way. The plan will include a few steps in its process. This paper briefly introduces the methods of implementation of the process and discusses the engineering activities of the plan

  19. Hygienic-sanitary working practices and implementation of a Hazard Analysis and Critical Control Point (HACCP plan in lobster processing industries

    Directory of Open Access Journals (Sweden)

    Cristina Farias da Fonseca

    2013-03-01

    Full Text Available This study aimed to verify the hygienic-sanitary working practices and to create and implement a Hazard Analysis Critical Control Point (HACCP in two lobster processing industries in Pernambuco State, Brazil. The industries studied process frozen whole lobsters, frozen whole cooked lobsters, and frozen lobster tails for exportation. The application of the hygienic-sanitary checklist in the industries analyzed achieved conformity rates over 96% to the aspects evaluated. The use of the Hazard Analysis Critical Control Point (HACCP plan resulted in the detection of two critical control points (CCPs including the receiving and classification steps in the processing of frozen lobster and frozen lobster tails, and an additional critical control point (CCP was detected during the cooking step of processing of the whole frozen cooked lobster. The proper implementation of the Hazard Analysis Critical Control Point (HACCP plan in the lobster processing industries studied proved to be the safest and most cost-effective method to monitor each critical control point (CCP hazards.

  20. SU-F-T-241: Reduction in Planning Errors Via a Process Control Developed Using the Eclipse Scripting API

    Energy Technology Data Exchange (ETDEWEB)

    Barbee, D; McCarthy, A; Galavis, P; Xu, A [NYU Langone Medical Center, New York, NY (United States)

    2016-06-15

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# to check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria

  1. Integrated production planning and control: A multi-objective optimization model

    Directory of Open Access Journals (Sweden)

    Cheng Wang

    2013-09-01

    Full Text Available Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP is the most popular resources planning and management system, however there are some shortcomings and deficiencies in the production planning and control because its core component is still the Material Requirements Planning (MRP. For the defects of ERP system, many local improvement and optimization schemes have been proposed, and improve the feasibility and practicality of the plan in some extent, but study considering the whole planning system optimization in the multiple performance management objectives and achieving better application performance is less. The purpose of this paper is to propose a multi-objective production planning optimization model Based on the point of view of the integration of production planning and control, in order to achieve optimization and control of enterprise manufacturing management. Design/methodology/approach: On the analysis of ERP planning system’s defects and disadvantages, and related research and literature, a multi-objective production planning optimization model is proposed, in addition to net demand and capacity, multiple performance management objectives, such as on-time delivery, production balance, inventory, overtime production, are considered incorporating into the examination scope of the model, so that the manufacturing process could be management and controlled Optimally between multiple objectives. The validity and practicability of the model will be verified by the instance in the last part of the paper. Findings: The main finding is that production planning management of manufacturing enterprise considers not only the capacity and materials, but also a variety of performance management objectives in the production process, and building a multi-objective optimization model can effectively optimize the management and control of enterprise

  2. A key to success: optimizing the planning process

    Science.gov (United States)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air

  3. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  4. Future planning: default network activity couples with frontoparietal control network and reward-processing regions during process and outcome simulations.

    Science.gov (United States)

    Gerlach, Kathy D; Spreng, R Nathan; Madore, Kevin P; Schacter, Daniel L

    2014-12-01

    We spend much of our daily lives imagining how we can reach future goals and what will happen when we attain them. Despite the prevalence of such goal-directed simulations, neuroimaging studies on planning have mainly focused on executive processes in the frontal lobe. This experiment examined the neural basis of process simulations, during which participants imagined themselves going through steps toward attaining a goal, and outcome simulations, during which participants imagined events they associated with achieving a goal. In the scanner, participants engaged in these simulation tasks and an odd/even control task. We hypothesized that process simulations would recruit default and frontoparietal control network regions, and that outcome simulations, which allow us to anticipate the affective consequences of achieving goals, would recruit default and reward-processing regions. Our analysis of brain activity that covaried with process and outcome simulations confirmed these hypotheses. A functional connectivity analysis with posterior cingulate, dorsolateral prefrontal cortex and anterior inferior parietal lobule seeds showed that their activity was correlated during process simulations and associated with a distributed network of default and frontoparietal control network regions. During outcome simulations, medial prefrontal cortex and amygdala seeds covaried together and formed a functional network with default and reward-processing regions. © The Author (2014). Published by Oxford University Press. For Permissions, please email: journals.permissions@oup.com.

  5. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  6. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  7. [Design of a HACCP Plan for the Gouda-type cheesemaking process in a milk processing plant].

    Science.gov (United States)

    Dávila, Jacqueline; Reyes, Genara; Corzo, Otoniel

    2006-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a preventive and systematic method used to identify, assess and control of the hazards related with raw material, ingredients, processing, marketing and intended consumer in order to assure the safety of the food. The aim of this study was to design a HACCP plan for implementing in a Gouda-type cheese-making process in a dairy processing plant. The used methodology was based in the application of the seven principles of the HACCP, the information from the plant about the compliment of the pre-requisite programs (70-80%), the experience of the HACCP team and the sequence of stages settles down by the COVENIN standard 3802 for implementing the HACCP system. A HACCP plan was proposed with the scope, the selection of HACCP team, the description of the product and the intended use, the flow diagram of the process, the hazard analysis and the control table of the plan with the critical control points (CCP). The following CCP were identified in the process: pasteurization, coagulation and ripening.

  8. Strategic planning and the budgeting process

    International Nuclear Information System (INIS)

    Craig, J.F.; Probasco, D.R.

    1993-01-01

    As the utility industry continues its transformation to a more competitive environment, companies are coming under ever-increasing pressure to avoid or minimize rate increases, implement new customer and environmental programs, and maintain profitability for shareholders. Two keys to having an effective organization in such an environment are the use of strategic planning and budgetary controls. The authors recently developed and implemented a strategic planning and budgeting process for a client in the Southwest. This paper reviews the highlights of that effort

  9. Ensuring the Process of Realisation of Financial Planning of Banking Activity

    OpenAIRE

    Kirkach Svitlana M.

    2014-01-01

    The article studies theoretical aspects of the process of realisation of financial planning of the bank's activity and identifies and justifies its six main stages: 1) goal formation stage; 2) preparation stage; 3) assessment; 4) financial plan approval; 5) financial plan execution, and 6) stage of the financial plan monitoring, control and adjustment. The above sequence of stages of the process of realisation of financial planning of the bank's activity allows a trustworthy assessment of the...

  10. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  11. Plan delivery quality assurance for CyberKnife: Statistical process control analysis of 350 film-based patient-specific QAs.

    Science.gov (United States)

    Bellec, J; Delaby, N; Jouyaux, F; Perdrieux, M; Bouvier, J; Sorel, S; Henry, O; Lafond, C

    2017-07-01

    Robotic radiosurgery requires plan delivery quality assurance (DQA) but there has never been a published comprehensive analysis of a patient-specific DQA process in a clinic. We proposed to evaluate 350 consecutive film-based patient-specific DQAs using statistical process control. We evaluated the performance of the process to propose achievable tolerance criteria for DQA validation and we sought to identify suboptimal DQA using control charts. DQAs were performed on a CyberKnife-M6 using Gafchromic-EBT3 films. The signal-to-dose conversion was performed using a multichannel-correction and a scanning protocol that combined measurement and calibration in a single scan. The DQA analysis comprised a gamma-index analysis at 3%/1.5mm and a separate evaluation of spatial and dosimetric accuracy of the plan delivery. Each parameter was plotted on a control chart and control limits were calculated. A capability index (Cpm) was calculated to evaluate the ability of the process to produce results within specifications. The analysis of capability showed that a gamma pass rate of 85% at 3%/1.5mm was highly achievable as acceptance criteria for DQA validation using a film-based protocol (Cpm>1.33). 3.4% of DQA were outside a control limit of 88% for gamma pass-rate. The analysis of the out-of-control DQA helped identify a dosimetric error in our institute for a specific treatment type. We have defined initial tolerance criteria for DQA validations. We have shown that the implementation of a film-based patient-specific DQA protocol with the use of control charts is an effective method to improve patient treatment safety on CyberKnife. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  12. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  13. Advance planning for air pollution control

    Energy Technology Data Exchange (ETDEWEB)

    Brewer, G L

    1972-11-01

    An air quality management program for nitric acid plants emitting pollutants which include nitrogen oxides is proposed. The program consists of the following five phases: an inventory of the handling equipment within the plant, including the identification of potential emission sources in terms of process material balances; source testing (if required); ambient air quality measurements; emission control analysis; and the development of a complete air management plan which includes a balance between air exhausted from buildups and processes and air supplied in a controlled economical manner. Typical NOx air pollution problems associated with nitric acid plants are reviewed along with various approaches to control and by-product recovery.

  14. A neo-strategic planning approach to enhance local tobacco control programs.

    Science.gov (United States)

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality

  15. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  16. Controlling the Instructional Development Process. Training Development and Research Center Project Number Fifteen.

    Science.gov (United States)

    Sleezer, Catherine M.; Swanson, Richard A.

    Process control is a way of training managers in business and industry to plan, monitor, and communicate the instructional development process of training projects. Two simple and useful tools that managers use in controlling the process of instructional development are the Process Control Planning Sheet and the Process Control Record. The Process…

  17. Ensuring the Process of Realisation of Financial Planning of Banking Activity

    Directory of Open Access Journals (Sweden)

    Kirkach Svitlana M.

    2014-03-01

    Full Text Available The article studies theoretical aspects of the process of realisation of financial planning of the bank’s activity and identifies and justifies its six main stages: 1 goal formation stage; 2 preparation stage; 3 assessment; 4 financial plan approval; 5 financial plan execution, and 6 stage of the financial plan monitoring, control and adjustment. The above sequence of stages of the process of realisation of financial planning of the bank’s activity allows a trustworthy assessment of the bank’s activity environment, formation of specific goals and tasks of the bank’s activity, and also to determine the ways of their achievement, and so on. The result of the process of realisation of financial planning of the bank’s activity is the bank’s financial plan, which is proposed to divide into four sub-sections: plan of the bank’s assets and liabilities; plan of the bank’s receipts and expenditures; plan of the bank’s cash flows; and plan of forecast values of basic financial indicators of the bank’s activity.

  18. Simple Models for Process Control

    Czech Academy of Sciences Publication Activity Database

    Gorez, R.; Klán, Petr

    2011-01-01

    Roč. 22, č. 2 (2011), s. 58-62 ISSN 0929-2268 Institutional research plan: CEZ:AV0Z10300504 Keywords : process model s * PID control * second order dynamics Subject RIV: JB - Sensors, Measurment, Regulation

  19. Reserves reporting for decision-making planning and control

    International Nuclear Information System (INIS)

    Higgins, G.

    1992-01-01

    This paper shows how the established Monte Carlo simulation approach to estimating hydrocarbon reserves can be expanded to provide the basis of a comprehensive valuation, planning and control system meeting all the reserve reporting requirements of an oil exploration and production company. The approach presented is also appropriate for other mining and extractive industries. The paper demonstrates how individual expectation curves can be modified to reflect both technically and commercially recoverable reserves and how these are in turn combined into the economic valuation, planning and control processes of an enterprise. Estimates across the full range of risk and reserves can be aggregated to provide a powerful planning tool that can be used to set corporate, divisional and individual objectives

  20. Low Activity Waste Feed Process Control Strategy

    International Nuclear Information System (INIS)

    STAEHR, T.W.

    2000-01-01

    The primary purpose of this document is to describe the overall process control strategy for monitoring and controlling the functions associated with the Phase 1B high-level waste feed delivery. This document provides the basis for process monitoring and control functions and requirements needed throughput the double-shell tank system during Phase 1 high-level waste feed delivery. This document is intended to be used by (1) the developers of the future Process Control Plan and (2) the developers of the monitoring and control system

  1. Business annual planning and controlling in Slovenian managerial practice

    OpenAIRE

    Pučko, Danijel; Čater, Tomasž

    2001-01-01

    Management process is usually segmented into planning, organizing, leading and controlling. The first and the last of these subprocesses are analyzed in the paper from the economic and managerial viewpoint as they occurr in Slovenian enterprise practice. The focus is on empirical research on a tactical level. Business analysis, tactical planning and controlling are the core issues analyzed in the article. The paper builds heavily on presenting empirical findings regarding the empirical system...

  2. Employing expert systems for process control

    International Nuclear Information System (INIS)

    Ahrens, W.

    1987-01-01

    The characteristic features of expert systems are explained in detail, and the systems' application in process control engineering. Four points of main interest are there, namely: Applications for diagnostic tasks, for safety analyses, planning, and training and expert training. For the modelling of the technical systems involved in all four task fields mentioned above, an object-centred approach has shown to be the suitable method, as process control techniques are determined by technical objects that in principle are specified by data sheets, schematic representations, flow charts, and plans. The graphical surface allows these data to be taken into account, so that the object can be displayed in the way best suited to the individual purposes. (orig./GL) [de

  3. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  4. LERF Basin 44 Process Test Plan

    International Nuclear Information System (INIS)

    LUECK, K.J.

    1999-01-01

    This document presents a plan to process a portion of the Liquid Effluent Retention Facility (LERF) Basin 44 wastewater through the 200 Area Effluent Treatment Facility (ETF). The objective of this process test is to determine the most effective/efficient method to treat the wastewater currently stored in LERF Basin 44. The process test will determine the operational parameters necessary to comply with facility effluent discharge permit limits (Ecology 1995) and the Environmental Restoration Disposal Facility (ERDF) acceptance criteria (BHI-00139), while achieving ALARA goals and maintaining the integrity of facility equipment. A major focus of the test plan centers on control of contamination due to leaks and/or facility maintenance. As a pre-startup item, all known leaks will be fixed before the start of the test. During the course of the test, a variety of contamination control measures will be evaluated for implementation during the treatment of the remaining Basin 44 inventory. Of special interest will be techniques and tools used to prevent contamination spread during sampling and when opening contaminated facility equipment/piping. At the conclusion of the test, a post ALARA review will be performed to identify lessons learned from the test run which can be applied to the treatment of the remaining Basin 44 inventory. The volume of wastewater to be treated during this test run is 500,000 gallons. This volume limit is necessary to maintain the ETF radiological inventory limits per the approved authorization basis. The duration of the process test is approximately 30 days

  5. The text plan concept: contributions to the writing planning process

    Directory of Open Access Journals (Sweden)

    Ana Lúcia Tinoco Cabral

    2013-12-01

    Full Text Available Students - at different levels, ranging from early grades up to PhD - face problems both on comprehension and text production. This paper focuses on the text plan concept according to the DTA (Discourse Text Analysis approach, i.e., a principle of organization that allows students to put into practice the production intention as well as to arrange text information while producing; being responsible for the text compositional structure (Adam, 2008. The study analyzes the relation between text plan and the writing planning process, in which the first one provides the second with theoretical support. In order to develop such research, the study covers some issues related to the reading skill, analyzes an argumentative text as per its textual plan, and presents some reflections on the writing process, focusing on the relation between textual plan and the writing planning process.

  6. 21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.

    Science.gov (United States)

    2010-04-01

    ... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... Provisions § 123.6 Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan. (a) Hazard... fish or fishery product being processed in the absence of those controls. (b) The HACCP plan. Every...

  7. Intelligent process control operator aid -- An artificial intelligence approach

    International Nuclear Information System (INIS)

    Sharma, D.D.; Miller, D.D.; Hajek, B.; Chandrasekaran, B.

    1986-01-01

    This paper describes an approach for designing intelligent process and power plant control operator aids. It is argued that one of the key aspects of an intelligent operator aid is the capability for dynamic procedure synthesis with incomplete definition of initial state, unknown goal states, and the dynamic world situation. The dynamic world state is used to determine the goal, select appropriate plan steps from prespecified procedures to achieve the goal, control the execution of the synthesized plan, and provide for dynamic recovery from failure often using a goal hierarchy. The dynamic synthesis of a plan requires integration of various problems solving capabilities such as plan generation, plan synthesis, plan modification, and failure recovery from a plan. The programming language for implementing the DPS framework provides a convenient tool for developing applications. An application of the DPS approach to a Nuclear Power Plant emergency procedure synthesis is also described. Initial test results indicate that the approach is successful in dynamically synthesizing the procedures. The authors realize that the DPS framework is not a solution for all control tasks. However, many existing process and plant control problems satisfy the requirements discussed in the paper and should be able to benefit from the framework described

  8. 40 CFR 130.5 - Continuing planning process.

    Science.gov (United States)

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall establish and maintain a continuing planning process (CPP) as described under section 303(e)(3)(A)-(H) of... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Continuing planning process. 130.5...

  9. 49 CFR 225.33 - Internal Control Plans.

    Science.gov (United States)

    2010-10-01

    ... official business. Each railroad shall amend its Internal Control Plan, as necessary, to reflect any..., incident, injury or illness will not be permitted or tolerated and will result in some stated disciplinary... paragraph (a)(1). Each railroad shall have procedures to process complaints from any person about the policy...

  10. Statistical process control analysis for patient-specific IMRT and VMAT QA.

    Science.gov (United States)

    Sanghangthum, Taweap; Suriyapee, Sivalee; Srisatit, Somyot; Pawlicki, Todd

    2013-05-01

    This work applied statistical process control to establish the control limits of the % gamma pass of patient-specific intensity modulated radiotherapy (IMRT) and volumetric modulated arc therapy (VMAT) quality assurance (QA), and to evaluate the efficiency of the QA process by using the process capability index (Cpml). A total of 278 IMRT QA plans in nasopharyngeal carcinoma were measured with MapCHECK, while 159 VMAT QA plans were undertaken with ArcCHECK. Six megavolts with nine fields were used for the IMRT plan and 2.5 arcs were used to generate the VMAT plans. The gamma (3%/3 mm) criteria were used to evaluate the QA plans. The % gamma passes were plotted on a control chart. The first 50 data points were employed to calculate the control limits. The Cpml was calculated to evaluate the capability of the IMRT/VMAT QA process. The results showed higher systematic errors in IMRT QA than VMAT QA due to the more complicated setup used in IMRT QA. The variation of random errors was also larger in IMRT QA than VMAT QA because the VMAT plan has more continuity of dose distribution. The average % gamma pass was 93.7% ± 3.7% for IMRT and 96.7% ± 2.2% for VMAT. The Cpml value of IMRT QA was 1.60 and VMAT QA was 1.99, which implied that the VMAT QA process was more accurate than the IMRT QA process. Our lower control limit for % gamma pass of IMRT is 85.0%, while the limit for VMAT is 90%. Both the IMRT and VMAT QA processes are good quality because Cpml values are higher than 1.0.

  11. OCRWM's evolving strategic planning process and the 1990 plan

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  12. High-Level Waste (HLW) Feed Process Control Strategy

    International Nuclear Information System (INIS)

    STAEHR, T.W.

    2000-01-01

    The primary purpose of this document is to describe the overall process control strategy for monitoring and controlling the functions associated with the Phase 1B high-level waste feed delivery. This document provides the basis for process monitoring and control functions and requirements needed throughput the double-shell tank system during Phase 1 high-level waste feed delivery. This document is intended to be used by (1) the developers of the future Process Control Plan and (2) the developers of the monitoring and control system

  13. 45 CFR 98.14 - Plan process.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Plan process. 98.14 Section 98.14 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17...

  14. Manufacturing Squares: An Integrative Statistical Process Control Exercise

    Science.gov (United States)

    Coy, Steven P.

    2016-01-01

    In the exercise, students in a junior-level operations management class are asked to manufacture a simple product. Given product specifications, they must design a production process, create roles and design jobs for each team member, and develop a statistical process control plan that efficiently and effectively controls quality during…

  15. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  16. A two-stage planning and control model toward Economically Adapted Power Distribution Systems using analytical hierarchy processes and fuzzy optimization

    Energy Technology Data Exchange (ETDEWEB)

    Schweickardt, Gustavo [Instituto de Economia Energetica, Fundacion Bariloche, Centro Atomico Bariloche - Pabellon 7, Av. Bustillo km 9500, 8400 Bariloche (Argentina); Miranda, Vladimiro [INESC Porto, Instituto de Engenharia de Sistemas e Computadores do Porto and FEUP, Faculdade de Engenharia da Universidade do Porto, R. Dr. Roberto Frias, 378, 4200-465 Porto (Portugal)

    2009-07-15

    This work presents a model to evaluate the Distribution System Dynamic De-adaptation respecting its planning for a given period of Tariff Control. The starting point for modeling is brought about by the results from a multi-criteria method based on Fuzzy Dynamic Programming and on Analytic Hierarchy Processes applied in a mid/short-term horizon (stage 1). Then, the decision-making activities using the Hierarchy Analytical Processes will allow defining, for a Control of System De-adaptation (stage 2), a Vector to evaluate the System Dynamic Adaptation. It is directly associated to an eventual series of inbalances that take place during its evolution. (author)

  17. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  18. A Process for Planning.

    Science.gov (United States)

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  19. Applying Statistical Process Control to Clinical Data: An Illustration.

    Science.gov (United States)

    Pfadt, Al; And Others

    1992-01-01

    Principles of statistical process control are applied to a clinical setting through the use of control charts to detect changes, as part of treatment planning and clinical decision-making processes. The logic of control chart analysis is derived from principles of statistical inference. Sample charts offer examples of evaluating baselines and…

  20. 15 CFR 923.13 - Energy facility planning process.

    Science.gov (United States)

    2010-01-01

    ... facility planning process. The management program must contain a planning process for energy facilities... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... affected public and private parties will be involved in the planning process. [61 FR 33806, June 28, 1996...

  1. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  2. Participative planning and information flow within management control

    Directory of Open Access Journals (Sweden)

    Tomasz Dyczkowski

    2016-09-01

    Full Text Available The paper examines the relationships between two different approaches to planning processes (participa- tive and non-participative and information flows within management control in companies. It augments the existing theoretical and empirical research by coupling management control and management infor- mation with participative planning, not only in operational but also in the strategic perspective. The re- sults presented in the paper stem from two consecutive studies, conducted between November 2010 and January 2012 and between November 2013 and January 2014. The studies comprised 397 and 179 Polish companies respectively. The authors formulated two hypotheses linking participative planning with upward and downward management information flows. The paper employed a quantitative approach, using the Spearman rank correlation analysis and hierarchical clustering using the Ward method, which enabled comparative analyses both in reference to various groups of companies included in particular research samples and over time. The results obtained showed the positive influence of participative plan- ning both on upward and downward information flows in enterprises. In particular, participative planning reduced information imbalances between top (the management and lower (employees of functional departments tiers in organisation structures.

  3. Metals and Alloys Material Stabilization Process Plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.; BURK, R.A.

    2000-05-18

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration.

  4. Metals and Alloys Material Stabilization Process Plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.; BURK, R.A.

    2000-01-01

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration

  5. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    Science.gov (United States)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  6. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  7. A Quadrant Analysis on the Effectiveness of Planning and Control in Urban Housing Development in Selangor

    Directory of Open Access Journals (Sweden)

    Hamizah Yakob

    2016-01-01

    Full Text Available The current planning mechanisms which are development plan and planning control were recognised as important tools in housing planning process. However, the weaknesses involved in the preparation of development plans and its implementation through development control may impose constraints on housing development. The objective of this paper is to evaluate whether the housing planning and control activities practiced require improvement in terms of the level of effectiveness of its implementation by the LPAs and PCs in Selangor using Quadrant Analysis. It was found that three activities; location, compliance and difficulties need high attention to achieve effective housing planning control.

  8. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  9. Implementation of imaging of the national protocol for quality control in planning systems

    International Nuclear Information System (INIS)

    Caudepon Moreno, F.; Martin-Viera cueto, J. A.; Bodineau gil, C.; Benitez Villegas, E. M.; Casado Villalon, F. J.; Moreno Sainz, C.

    2011-01-01

    Quality control of the planning system (SP) plays a key role in quality assurance schemes that include all stages of the radiotherapy process.In this work we focus on the evidence detailing the ''Protocol for quality control in therapy planning systems with ionizing radiation of the SEFM in ''anatomical data acquisition (DA).

  10. 23 CFR 450.208 - Coordination of planning process activities.

    Science.gov (United States)

    2010-04-01

    ... process. (h) The statewide transportation planning process should be consistent with the Strategic Highway... 23 Highways 1 2010-04-01 2010-04-01 false Coordination of planning process activities. 450.208... Coordination of planning process activities. (a) In carrying out the statewide transportation planning process...

  11. MO-B-BRB-00: Optimizing the Treatment Planning Process

    International Nuclear Information System (INIS)

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  12. MO-B-BRB-00: Optimizing the Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  13. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  14. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  15. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  16. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  17. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  18. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  19. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  20. Development of automated welding process for field fabrication of thick walled pressure vessels: management plan

    International Nuclear Information System (INIS)

    1979-01-01

    A Westinghouse Electric Corp. management plan is presented that consists of the following: management structure; management processes; contract work breakdown structure; schedules; cost plan; contract change control procedures; and government owned property

  1. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    Science.gov (United States)

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. A system architecture for holonic manufacturing planning and control (EtoPlan)

    NARCIS (Netherlands)

    Wullink, Gerhard; Giebels, M.M.T.; Kals, H.J.J.

    2002-01-01

    In this paper, we present the system architecture of a flexible manufacturing planning and control system, named EtoPlan. The concept is based on the holonic control approach of building multiple and temporary hierarchies (holarchies). This paper describes the system architecture for flexible

  3. Expect systems and optimisation in process control

    Energy Technology Data Exchange (ETDEWEB)

    Mamdani, A.; Efstathiou, J. (eds.)

    1986-01-01

    This report brings together recent developments both in expert systems and in optimisation, and deals with current applications in industry. Part One is concerned with Artificial Intellegence in planning and scheduling and with rule-based control implementation. The tasks of control maintenance, rescheduling and planning are each discussed in relation to new theoretical developments, techniques available, and sample applications. Part Two covers model based control techniques in which the control decisions are used in a computer model of the process. Fault diagnosis, maintenance and trouble-shooting are just some of the activities covered. Part Three contains case studies of projects currently in progress, giving details of the software available and the likely future trends. One of these, on qualitative plant modelling as a basis for knowledge-based operator aids in nuclear power stations is indexed separately.

  4. Expert systems and optimisation in process control

    International Nuclear Information System (INIS)

    Mamdani, A.; Efstathiou, J.

    1986-01-01

    This report brings together recent developments both in expert systems and in optimisation, and deals with current applications in industry. Part One is concerned with Artificial Intellegence in planning and scheduling and with rule-based control implementation. The tasks of control maintenance, rescheduling and planning are each discussed in relation to new theoretical developments, techniques available, and sample applications. Part Two covers model based control techniques in which the control decisions are used in a computer model of the process. Fault diagnosis, maintenance and trouble-shooting are just some of the activities covered. Part Three contains case studies of projects currently in progress, giving details of the software available and the likely future trends. One of these, on qualitative plant modelling as a basis for knowledge-based operator aids in nuclear power stations is indexed separately. (author)

  5. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  6. Strategy in Generative Planning of Turning Processes

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kals, H.J.J.

    1986-01-01

    This paper reports on the process and operations planning system ROUND and the strategies which underlie the decision making processes in the planning of turning operations. At first, an outline is given about the environment for which generative systems like ROUND are being developed. The

  7. Process Control Plan for Tank 241-SY-101 Surface Level Rise Remediation

    International Nuclear Information System (INIS)

    ESTEY, S.D.

    1999-01-01

    designed and built waste transfer and dilution system. This Process Control Plan (PCP) deals with the operation of the system, To facilitate design, construction, and operation, this transfer system conveys waste from tank to tank via a transfer line composed of an overground, encased flexible hose. An existing waste transfer pump, known alternately as the new generation transfer pump (NGTP) or pump P-350, is installed in 241-SY-101 to accomplish the transfer. Instrumentation and control features are kept as simple as possible to facilitate the mitigation activity, yet comply with the necessary safety constraints. The design incorporates a pressurized, heated water supply to provide a high degree of operational flexibility and reliability by limiting the concentration of waste slurries in transfer. The transfer system water supply also provides the water for dilution of the waste in tank 241-SY-101. Various connections are provided to supply dilution water addition devices from the dedicated transfer system water supply

  8. Statistical control process to compare and rank treatment plans in radiation oncology: impact of heterogeneity correction on treatment planning in lung cancer.

    Science.gov (United States)

    Chaikh, Abdulhamid; Balosso, Jacques

    2016-12-01

    This study proposes a statistical process to compare different treatment plans issued from different irradiation techniques or different treatment phases. This approach aims to provide arguments for discussion about the impact on clinical results of any condition able to significantly alter dosimetric or ballistic related data. The principles of the statistical investigation are presented in the framework of a clinical example based on 40 fields of radiotherapy for lung cancers. Two treatment plans were generated for each patient making a change of dose distribution due to variation of lung density correction. The data from 2D gamma index (γ) including the pixels having γ≤1 were used to determine the capability index (Cp) and the acceptability index (Cpk) of the process. To measure the strength of the relationship between the γ passing rates and the Cp and Cpk indices, the Spearman's rank non-parametric test was used to calculate P values. The comparison between reference and tested plans showed that 95% of pixels have γ≤1 with criteria (6%, 6 mm). The values of the Cp and Cpk indices were lower than one showing a significant dose difference. The data showed a strong correlation between γ passing rates and the indices with P>0.8. The statistical analysis using Cp and Cpk, show the significance of dose differences resulting from two plans in radiotherapy. These indices can be used for adaptive radiotherapy to measure the difference between initial plan and daily delivered plan. The significant changes of dose distribution could raise the question about the continuity to treat the patient with the initial plan or the need for adjustments.

  9. Design of a HACCP plan for the industrial process of vacuum-packed frozen surimi

    Directory of Open Access Journals (Sweden)

    Catarina Fernandes

    2014-05-01

    Full Text Available The Hazard Analysis and Critical Control Point (HACCP is a system that enables identification, assessment and control of hazards related with production, processing, distribution in order to get safe food. The aim of this study was to design a HACCP plan for implementing in a processing line of vacuum-packed frozen surimi. Surimi is made from fisheries byproducts that may have initial unattractive characteristics and whose industrial processing adds commercial value. Heterogeneous quality of raw products and the high complexity of the industrial flowchart may induce problems in the final sanitary profile of surimi. The methodology was based in the evaluation of the pre-requisite programs, risk evaluation of considered hazards, the application of principles of HACCP and the compliance with European regulations. A HACCP plan is proposed with the scope, the selection of HACCP team, product description and its intended use, the flow diagram of the process, hazard analysis and identification of Critical Control Points (CCP, monitoring system, correction actions and records. The potential hazards identified were: excess of chloride (chemical, remains of fishbone (physical and growth of human-related pathogens after defrosting (biological. The control measures of CCP are referred as control of time-temperature and pH in pre-wash and defrosting stages and visual inspection during depulping process.

  10. Strategic planning processes and hospital financial performance.

    Science.gov (United States)

    Kaissi, Amer A; Begun, James W

    2008-01-01

    Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.

  11. On the Automatic Generation of Plans for Life Cycle Assembly Processes

    Energy Technology Data Exchange (ETDEWEB)

    CALTON,TERRI L.

    2000-01-01

    Designing products for easy assembly and disassembly during their entire life cycles for purposes including product assembly, product upgrade, product servicing and repair, and product disposal is a process that involves many disciplines. In addition, finding the best solution often involves considering the design as a whole and by considering its intended life cycle. Different goals and manufacturing plan selection criteria, as compared to initial assembly, require re-visiting significant fundamental assumptions and methods that underlie current assembly planning techniques. Previous work in this area has been limited to either academic studies of issues in assembly planning or to applied studies of life cycle assembly processes that give no attention to automatic planning. It is believed that merging these two areas will result in a much greater ability to design for, optimize, and analyze the cycle assembly processes. The study of assembly planning is at the very heart of manufacturing research facilities and academic engineering institutions; and, in recent years a number of significant advances in the field of assembly planning have been made. These advances have ranged from the development of automated assembly planning systems, such as Sandia's Automated Assembly Analysis System Archimedes 3.0{copyright}, to the startling revolution in microprocessors and computer-controlled production tools such as computer-aided design (CAD), computer-aided manufacturing (CAM), flexible manufacturing systems (EMS), and computer-integrated manufacturing (CIM). These results have kindled considerable interest in the study of algorithms for life cycle related assembly processes and have blossomed into a field of intense interest. The intent of this manuscript is to bring together the fundamental results in this area, so that the unifying principles and underlying concepts of algorithm design may more easily be implemented in practice.

  12. Potential biological hazard of importance for HACCP plans in fresh fish processing

    Directory of Open Access Journals (Sweden)

    Baltić Milan Ž.

    2009-01-01

    Full Text Available The Hazard Analysis and Critical Control Point (HACCP system is scientifically based and focused on problem prevention in order to assure the produced food products are safe to consume. Prerequisite programs such as GMP (Good Manufacturing Practices, GHP (Good Hygienic Practices are an essential foundation for the development and implementation of successful HACCP plans. One of the preliminary tasks in the development of HACCP plan is to conduct a hazard analysis. The process of conducting a hazard analysis involves two stages. The first is hazard identification and the second stage is the HACCP team decision which potential hazards must be addressed in the HACCP plan. By definition, the HACCP concept covers all types of potential food safety hazards: biological, chemical and physical, whether they are naturally occurring in the food, contributed by the environment or generated by a mistake in the manufacturing process. In raw fish processing, potential significant biological hazards which are reasonably likely to cause illness of humans are parasites (Trematodae, Nematodae, Cestodae, bacteria (Salmonella, E. coli, Vibrio parahemolyticus, Vibrio vulnificus, Listeria monocytogenes, Clostridium botulinum, Staphyloccocus aureus, viruses (Norwalk virus, Entero virusesi, Hepatitis A, Rotovirus and bio-toxins. Upon completion of hazard analysis, any measure(s that are used to control the hazard(s should be described.

  13. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  14. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  15. Birth control, population control, and family planning: an overview.

    Science.gov (United States)

    Critchlow, D T

    1995-01-01

    This overview of the US birth control movement reflects on the emergence of family planning policy due to the efforts of Margaret Sanger, feminists, and the civil rights movement, the eugenics motive to limit "deviant" populations, and the population control movement, which aims to solve social and economic problems through fertility control. Population control moved through three stages: from the cause of "voluntary motherhood" to advance suffrage and women's political and social status, to the concept of "birth control" promoted by socialist feminists to help empower women and the working class, to, from 1920 on, a liberal movement for civil rights and population control. Physicians such as Dr. Robert Latou Dickinson legitimized the movement in the formation of the Committee on Maternal Health in 1925, but the movement remained divided until 1939, when Sanger's group merged with the American Birth Control League, the predecessor of the present Planned Parenthood Federation of America. A key legal decision in 1939 in the United States v. One Package amended the Comstock Act and allowed for the distribution of birth control devices by mail to physicians. Sanger, after a brief retirement, formed the International Planned Parenthood Federation and supported research into the pill. Eugenicists through the Committee on Maternal Health supported Christopher Tietze and others developing the pill. Final constitutional access to contraception based on the right to privacy was granted in Griswold v. Connecticut. The ruling in Eisenstadt v. Baird in 1972 extended this right to unmarried persons. The right to privacy was further extended in the Roe v. Wade decision in 1973 on legal abortion. The argument for improving the quality of the population remained from the formation of the Population Reference Bureau in 1929 through the 1960s. Under the leadership of Rockefeller, population control was defined as justified on a scientific and humanitarian basis. US government support

  16. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  17. Integration of air quality-related planning processes : report

    International Nuclear Information System (INIS)

    2004-05-01

    Several communities in British Columbia have conducted air quality, greenhouse gas, or community energy management plans. This report explored the possibility of integrating 3 community-based air quality-related planning processes into a single process and evaluated the use of these 3 processes by local governments and First Nations in identifying and addressing air quality-related objectives, and determined to what extent they could be integrated to achieve planning objectives for air quality, greenhouse gas emissions, and energy supply and conservation. The lessons learned from 9 case studies in British Columbia were presented. The purpose of the case studies was to examine how communities handled emissions and energy related inventory and planning work, as well as their experiences with, or considerations for, an integrated process. The lessons were grouped under several key themes including organization and stakeholder involvement; messaging and focus; leadership/champions; and resources and capacity. The report also outlined a framework for an integrated planning process and provided recommendations regarding how an integrated or complementary process could be performed. A number of next steps were also offered for the provincial government to move the concept of an integrated process forward with the assistance of other partners. These included identifying the resources required to support communities engaging in an integrated process as well as discussing the series of options for provincial support with key stakeholders. refs., tabs., figs

  18. Organizational factors, planning capacity, and integration challenges constrain provincial planning processes for nutrition in decentralizing Vietnam.

    Science.gov (United States)

    Lapping, Karin; Frongillo, Edward A; Nguyen, Phuong H; Coates, Jennifer; Webb, Patrick; Menon, Purnima

    2014-09-01

    Translating national policies and guidelines into effective action at the subnational level (e.g., province or region) is a prerequisite for ensuring an impact on nutrition. In several countries, including Vietnam, the focus of this paper, this process is affected by the quality of the decentralized process of planning and action. This study examined how provincial planning processes for nutrition occurred in Vietnam during 2009 and 2010. Key goals were to understand variability in processes across provinces, identify factors that influenced the process, and assess the usefulness of the process for individuals involved in planning and action. A qualitative case-study methodology was used. Data were drawn from interviews with 51 government officials in eight provinces. The study found little variability in the planning process among these eight provinces, probably due to a planning process that was predominantly a fiscal exercise within the confines of a largely centralized structure. Respondents were almost unanimous about the main barriers: a top-down approach to planning, limited human capacity for effective planning at subnational levels, and difficulty in integrating actions from multiple sectors. Provincial-level actors were deeply dissatisfied with the nature of their role in the process. Despite the rhetoric to the contrary, too much power is probably still retained at the central level. A strategic multiyear approach is needed to strengthen the provincial planning process and address many of the key barriers identified in this study.

  19. Advance care planning in CKD/ESRD: an evolving process.

    Science.gov (United States)

    Holley, Jean L

    2012-06-01

    Advance care planning was historically considered to be simply the completion of a proxy (health care surrogate designation) or instruction (living will) directive that resulted from a conversation between a patient and his or her physician. We now know that advance care planning is a much more comprehensive and dynamic patient-centered process used by patients and families to strengthen relationships, achieve control over medical care, prepare for death, and clarify goals of care. Some advance directives, notably designated health care proxy documents, remain appropriate expressions of advance care planning. Moreover, although physician orders, such as do-not-resuscitate orders and Physician Orders for Life-Sustaining Treatment, may not be strictly defined as advance directives, their completion, when appropriate, is an integral component of advance care planning. The changing health circumstances and illness trajectory characteristic of ESRD mandate that advance care planning discussions adapt to a patient's situation and therefore must be readdressed at appropriate times and intervals. The options of withholding and withdrawing dialysis add ESRD-specific issues to advance care planning in this population and are events each nephrologist will at some time confront. Advance care planning is important throughout the spectrum of ESRD and is a part of nephrology practice that can be rewarding to nephrologists and beneficial to patients and their families.

  20. Implementation of a Web-Based Collaborative Process Planning System

    Science.gov (United States)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  1. Hornby's principles of fire control planning

    Science.gov (United States)

    H. T. Gisborne

    1939-01-01

    On August 27, 1937, Lloyd G. Hornby died of heart failure on the Toboggan Creek forest fire in the Clearwater National Forest. Few if any men in or out of the U.S. Forest Service have made a greater contribution to fire control planning than did he. In the following article, H. T. Gisborne outlines the principles of fire control planning developed by Mr. Hornby,...

  2. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    International Nuclear Information System (INIS)

    Feng, W.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  3. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    Energy Technology Data Exchange (ETDEWEB)

    Feng, W. [New York Presbyterian Hospital (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  4. Participative Facility Planning for Obstetrical and Neonatal Care Processes: Beginning of Life Process

    Directory of Open Access Journals (Sweden)

    Jori Reijula

    2016-01-01

    Full Text Available Introduction. Old hospitals may promote inefficient patient care processes and safety. A new, functionally planned hospital presents a chance to create an environment that supports streamlined, patient-centered healthcare processes and adapts to users’ needs. This study depicts the phases of a facility planning project for pregnant women and newborn care processes (beginning of life process at Turku University Hospital. Materials and Methods. Project design reports and meeting documents were utilized to assess the beginning of life process as well as the work processes of the Women’s and Children’s Hospital. Results. The main elements of the facility design (FD project included rigorous preparation for the FD phase, functional planning throughout the FD process, and setting key values: (1 family-centered care, (2 Lean thinking and Lean tools as the framework for the FD process, (3 safety, and (4 cooperation. Conclusions. A well-prepared FD project with sufficient insight into functional planning, Lean thinking, and user-centricity seemed to facilitate the actual FD process. Although challenges occurred, the key values were not forgone and were successfully incorporated into the new hospital building.

  5. Software configuration management plan for the TWRS controlled baseline database system [TCBD

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project's requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user's requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  6. Segurança e produção: um modelo para o planejamento e controle integrado Safety and production: an integrated planning and control model

    Directory of Open Access Journals (Sweden)

    Tarcisio A. Saurin

    2002-01-01

    Full Text Available Este artigo apresenta um modelo de planejamento e controle da segurança no trabalho (PCS integrado ao processo de planejamento e controle da produção (PCP. O modelo foi desenvolvido por meio de dois estudos empíricos em obras industriais, adotando-se a pesquisa ação como estratégia de pesquisa. Os requisitos de segurança são integrados ao PCP em três níveis hierárquicos deste processo. No nível de longo prazo, o planejamento da segurança é configurado pelo desenvolvimento de análises preliminares de risco dos processos construtivos. A atualização e detalhamento da implantação destes planos é então feita por meio de sua integração aos níveis de médio e curto prazo do PCP.This paper presents a safety planning and control model (SPC that has been integrated to the production planning and control process. The model was developed through two action research empirical studies in industrial construction projects. Safety requirements are integrated into three hierarchical levels of planning and control process. At the long-term level, safety planning is featured by preliminary hazard analysis of construction processes. These plans are updated and detailed through its integration into both medium-term and short-term planning levels.

  7. 42 CFR 84.40 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  8. 30 CFR 28.30 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  9. Diagnostic system for process control at NPP Dukovany load follow

    International Nuclear Information System (INIS)

    Rubek, J.; Petruzela, I.

    1998-01-01

    The NPP Dukovany is being operated in the frequency control since 1996. In last year a project for the plant load follow has been developed. One part of the project is to install a diagnostic system for process control. At present the main control loops of the plant control system are regular tested after unit refuelling only. The functionality and control system parameter adjusting is tested by certificated procedures. This state is unsuitable in view of the plan load follow operation. The relevant operational modes are based on minimisation of influence on plant component life time and on achievement of planned unit parameters. Therefore it is necessary to provide testing of main control system parts in shorter time period. Mainly at time when the unit is really in load follow operation. The paper describes the diagnostic system for process control which will be at NPP Dukovany implemented. The principal of the system will be evaluation of real and expected changes of technological variables. The system utilises thermohydraulic relation among main technological variables and relation among controlled and manipulated variables. Outputs of the system will be used to operational staff support at the plant operation. It enables: determination of control system state, estimation and check of future control system state, early indication of the deviation of process from normal conditions, check of efficiency of operational staff intervention into plant control. The system gives the plant operator new information for the plant process control. Simultaneously the coupling of new system outputs on existing signalisation is solved. (author)

  10. On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process

    Science.gov (United States)

    Hongzhi, Zhao; Jian, Zhang

    2018-03-01

    The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.

  11. Planning instruments to control urban growth

    DEFF Research Database (Denmark)

    Jørgensen, Gertrud; Nielsen, Thomas Alexander Sick

    2010-01-01

    It is challenging to plan and control urban development in peri-urban areas. But if no planning is done, the result will often be unsustainable, including widespread, dispersed and uncoordinated urban growth. Spatial planning based on zoning remains the most important planning instrument and its...... success depend on regional coordination. Incentive based instruments may contrbute to growth management, but only few examples are available and their effects on urban growth patterns yet to be seen....

  12. The planning of training process in triathlon

    Directory of Open Access Journals (Sweden)

    Volodymyr Vodlozerov

    2016-04-01

    Full Text Available Purpose: is the working out of base variant of training process as the base for planning of individual training of triathlete. Material & Methods: studying and generalization of special literature of basis training process for endurance in cyclic kinds of sports, the analysis of training of famous triathletes to competitions. Results: mane stages of training process formation in triathlon and features of distribution of sportsman’s training load in depending on period of training were considered. Conclusions: comprehensive planning of training process in different kinds of triathlon is lying down in basis of improving of competition form of triathlete.

  13. Resource Planning for Massive Number of Process Instances

    Science.gov (United States)

    Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui

    Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.

  14. Pre-movement planning processes in people with congenital mirror movements.

    Science.gov (United States)

    Franz, E A; Fu, Y

    2017-10-01

    Pre-movement processes were investigated in people with Congenital mirrormovement (CMM), a rare disorder in which bilateral movement (mirroring) occurs in the upper distal extremities (primarily the hands and fingers) during intended unilateral movements. Abnormal density of ipsilateral corticospinal projections is an established hallmark of CMM. This study tested whether the Lateralised Readiness Potential (LRP), which reflects movement planning and readiness, is also abnormal in people with CMM. Twenty-eight neurologically-normal controls and 8 people with CMM were tested on a unimanual Go/No-go task while electroencephalography (EEG) was recorded to assess the LRP. No significant group differences were found in reaction time (RT). However, significantly smaller LRP amplitudes were found, on average, in the CMM group compared to Controls at central-motor (C3,C4) sites in stimulus-locked and response-locked epochs; similar group differences were also found at further frontal sites (F3,F4) during response-locked epochs. Abnormal brain activity in pre-movement processes associated with response planning and preparation is present in people with CMM. Aberrant bilateral activity during pre-movement processes is clearly implicated; whether part of the etiology of CMM, or as a mechanism of neuro-compensation, is not yet known. Copyright © 2017 International Federation of Clinical Neurophysiology. Published by Elsevier B.V. All rights reserved.

  15. NATO Defence Planning Process. Implications for defence posture

    Directory of Open Access Journals (Sweden)

    Paweł Fleischer

    2015-12-01

    Full Text Available The NATO Defence Planning Process (NDPP is the most important element affecting the Alliance's defence posture. Under the process states commit themselves to provide capabilities and forces required to fulfil NATO missions, defined in the NATO Strategic Concept. The NDPP directly affects national defence plans by harmonizing them with identified security and defence objectives as well by influencing development of the novel national defence capabilities. The emergence of new threats in the NATO environment, demands modifications in the defense planning process and establishing new goals for the Alliance. Enhancement of the NDPP should be priority during the time of unrest.

  16. The Individualized Quality Control Plan - Coming Soon to Clinical Microbiology Laboratories Everywhere!

    Science.gov (United States)

    Anderson, Nancy

    2015-11-15

    As of January 1, 2016, microbiology laboratories can choose to adopt a new quality control option, the Individualized Quality Control Plan (IQCP), under the Clinical Laboratory Improvement Amendments of 1988 (CLIA). This voluntary approach increases flexibility for meeting regulatory requirements and provides laboratories the opportunity to customize QC for their testing in their unique environments and by their testing personnel. IQCP is an all-inclusive approach to quality based on risk management to address potential errors in the total testing process. It includes three main steps, (1) performing a risk assessment, (2) developing a QC plan, and (3) monitoring the plan through quality assessment. Resources are available from the Centers for Medicare & Medicaid Services, Centers for Disease Control and Prevention, American Society for Microbiology, Clinical and Laboratory Standards Institute, and accrediting organizations, such as the College of American Pathologists and Joint Commission, to assist microbiology laboratories implementing IQCP.

  17. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  18. Process quality planning of quality function deployment for carrot syrup

    Science.gov (United States)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  19. University Community Engagement and the Strategic Planning Process

    Directory of Open Access Journals (Sweden)

    Laura Newton Miller

    2018-03-01

    Full Text Available Abstract  Objectives – To understand how university libraries are engaging with the university community (students, faculty, campus partners, and administration when working through the strategic planning process.  Methods – Literature review and exploratory open-ended survey to members of CAUL (Council of Australian University Librarians, CARL (Canadian Association of Research Libraries, CONZUL (Council of New Zealand University Librarians, and RLUK (Research Libraries UK who are most directly involved in the strategic planning process at their library.  Results – Out of a potential 113 participants from 4 countries, 31 people (27% replied to the survey. Libraries most often mentioned the use of regularly-scheduled surveys to inform their strategic planning, which helps to truncate the process for some respondents, as opposed to conducting user feedback specifically for the strategic planning process. Other quantitative methods include customer intelligence and library-produced data. Qualitative methods include the use of focus groups, interviews, and user experience/design techniques to help inform the strategic plan. The focus of questions to users tended to fall towards user-focused (with or without library lens, library-focused, trends and vision, and feedback on plan.  Conclusions – Combining both quantitative and qualitative methods can help give a fuller picture for librarians working on a strategic plan. Having the university community join the conversation on how the library moves forward is an important but difficult endeavour.  Regardless, the university library needs to be adaptive to the rapidly changing environment around it. Having a sense of how other libraries engage with the university community benefits others who are tasked with strategic planning.

  20. Process Control Plan for 242-A Evaporator Campaign January 2001

    International Nuclear Information System (INIS)

    LE, E.Q.

    2001-01-01

    Wastewater stored in 104-AW that was generated during the terminal cleanout of the PUREX facility is the primary feed to be processed during the 242-A Evaporator Campaign 01-01, Approximately 801,600 gallons of 104-AW waste was transferred to feed tank 102-AW at the end of January 2001, in preparation for the campaign. The total feed volume that will be processed during Campaign 01-01 is 8 15,200 gallons, which includes the waste from 104-AW and residual waste from the previous evaporator campaign, 00-01, Additional feed will be generated during the pre-campaign cold run and processed during campaign 01-01. Based on characterization data from 104-AW feed waste 'and the evaluation of waste processability presented in Section 5 of this PCP, Campaign 01-01 does not pose any unacceptable risks to the facility, safety, environmental, human health offsite, or onsite personnel. Evaporator Campaign 01-01 is essential in supporting the River Protection Project (RPP) to maintaining its critical mission schedule and regulator commitments for tank waste systems. Several of RPP critical activities requiring completion of Campaign 01-01 by April 1, 2001 are highlighted below. Availability of DST space: Additional tank space that will be made available by this campaign is needed to support the continued interim stabilization of Single-Shell Tanks (SSTs). This additional space will also be used to move waste among Double-Shell Tanks (DSTs) to support the demonstrations of SST waste retrieval. DST life extension: An electrical outage in the AW Tank Farm is scheduled to begin following completion of the Campaign 01-01. This outage is a critical step in identifying and completing life extension upgrades to the DST systems. DST upgrades: Project W-314 plans significant upgrades to the AW Tank Farm to retrieve and supply waste feed to the Waste Treatment (Vitrification) Plant using a system that complies with current environmental requirements. These upgrades will commence on

  1. Minimal-effort planning of active alignment processes for beam-shaping optics

    Science.gov (United States)

    Haag, Sebastian; Schranner, Matthias; Müller, Tobias; Zontar, Daniel; Schlette, Christian; Losch, Daniel; Brecher, Christian; Roßmann, Jürgen

    2015-03-01

    In science and industry, the alignment of beam-shaping optics is usually a manual procedure. Many industrial applications utilizing beam-shaping optical systems require more scalable production solutions and therefore effort has been invested in research regarding the automation of optics assembly. In previous works, the authors and other researchers have proven the feasibility of automated alignment of beam-shaping optics such as collimation lenses or homogenization optics. Nevertheless, the planning efforts as well as additional knowledge from the fields of automation and control required for such alignment processes are immense. This paper presents a novel approach of planning active alignment processes of beam-shaping optics with the focus of minimizing the planning efforts for active alignment. The approach utilizes optical simulation and the genetic programming paradigm from computer science for automatically extracting features from a simulated data basis with a high correlation coefficient regarding the individual degrees of freedom of alignment. The strategy is capable of finding active alignment strategies that can be executed by an automated assembly system. The paper presents a tool making the algorithm available to end-users and it discusses the results of planning the active alignment of the well-known assembly of a fast-axis collimator. The paper concludes with an outlook on the transferability to other use cases such as application specific intensity distributions which will benefit from reduced planning efforts.

  2. Computerized property prediction and process planning in heat treatment of steels

    Energy Technology Data Exchange (ETDEWEB)

    Gergely, M. (Steel Advisory Centre for Industrial Technologies (SACIT), Budapest (Hungary)); Somogyi, S. (Steel Advisory Centre for Industrial Technologies (SACIT), Budapest (Hungary)); Kohlheb, R. (Steel Advisory Centre for Industrial Technologies (SACIT), Budapest (Hungary))

    1994-01-01

    Recent years have seen widespread interest in the establishment of prediction methods, based on phenomenological description and computer simulation of transformation processes during heat treatment, and in the introduction of software for technological planning. The steady development of this approach is aimed at meeting the requirement of metallurgists, design engineers dealing with material selection and dimensioning, and technologists planning heat treatment processes. Research in this field of computer simulation has been concentrated so far on two main areas of interest: . Modelling of transformation processes and the prediction of microstructures and/or properties, . Developing program packages to help solve concrete tasks such as material selection, on-line process control and monitoring, and the design of heat-treating operations. During the last two decades in the field of heat treatment, various mathematical models with different accuracy and complexity have been developed. In this paper, an attempt is made to outline some important results in computer simulation and computerized property prediction without aiming at completeness. The topic is restricted to quenched and tempered, and case-hardened steels. (orig.)

  3. Pathologic analysis of control plans for air pollution management in tehran metropolis: a qualitative study.

    Science.gov (United States)

    Shahrabi, Narges Salehi; Pourezzat, Aliasghar; Ahmad, Fayaz-Bakhsh; Mafimoradi, Shiva; Poursafa, Parinaz

    2013-09-01

    Regarding the importance of air pollution issue for large cities, as Tehran metropolis, many plans, programs, projects and regulations have been developed to manage urban air pollution. However, most of them failed to decline the pollution. The purpose of this study is to pathologically analyze air-pollution control plans in order to offer effective solutions for Tehran metropolis. A qualitative content analysis and a semi-structured interview with 14 practicing professionals were used to identify key causes and sources of Tehran's air pollution, to recognize challenges and obstacles towards effective performance of air-pollution control plans in this metropolitan area, and to suggest the most effective controlling solutions. Challenges related to air-pollution control plans can be divided into two major categories: Firstly lack of integrated and organized stewardship and secondly those related to political, economical, social and technical environmental abbreviated as PEST, challenges. For effective control of the Tehran air pollution, the following eight controlling alternatives were identified: Systematization of plan preparation process, organizing the stewardship, standardization and utilization of new technologies and professional experts, cultural and infrastructural development, realization of social justice, developing coordination and controlling mechanisms, improving citizen's participatory capacity, and focusing on effective management of fuel and energy. Controlling air pollution in Tehran should be considered as a priority for policymakers to make enforcements through applying a systemic cycle of preparation effective and comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders.

  4. Process control and optimization with simple interval calculation method

    DEFF Research Database (Denmark)

    Pomerantsev, A.; Rodionova, O.; Høskuldsson, Agnar

    2006-01-01

    for the quality improvement in the course of production. The latter is an active quality optimization, which takes into account the actual history of the process. The advocate approach is allied to the conventional method of multivariate statistical process control (MSPC) as it also employs the historical process......Methods of process control and optimization are presented and illustrated with a real world example. The optimization methods are based on the PLS block modeling as well as on the simple interval calculation methods of interval prediction and object status classification. It is proposed to employ...... the series of expanding PLS/SIC models in order to support the on-line process improvements. This method helps to predict the effect of planned actions on the product quality and thus enables passive quality control. We have also considered an optimization approach that proposes the correcting actions...

  5. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  6. Indicator based controlling of cantonal guiding planning in Switzerland: A model for more efficient sustainable planning instruments at the regional level

    Directory of Open Access Journals (Sweden)

    Keiner Marco

    2003-01-01

    Full Text Available In the actual Swiss cantonal planning practice every 10 years in general, there is a review of the guiding plan. The plan’s evaluation typically takes place shortly before the revision process. In the interstitial time, the guiding plan’s effectiveness can only be anticipated. In the review, a survey of both, the desired and unwanted spatial effects are often absent. As a result, a thorough analysis of the effects and the direction of the spatial development cannot be accomplished. A spatial plan that is geared to the principle of sustainability needs the outputs of such an analysis. Development assessments are required to verify the plans’ effects, well-defined goals to assist in rectifying deviations, key indicators to identify efficiency potentials, and precautionary measures to allow for an adaptable and responsive planning methodology. The instruments, which might assist in the cantonal guiding plan objectives implementation, do exist. Such instruments are monitoring, controlling and benchmarking (with the support of indicators. These tools can assist in ensuring the plan’s overall value and the effectiveness and appropriateness of the ensuing development. By using these tools and a sound planning methodology, unsustainable spatial development can be tracked early and rectified with appropriated measures. The control as this system’s central instrument is presented here and its application opportunities in the cantonal guiding planning are discussed. In order to achieve a sustainable spatial development and a more dynamic guiding planning, the application of control and benchmarking is crucial.

  7. Guidelines for evaluating software configuration management plans for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Kim, Jang Yeon

    2001-08-01

    Software configuration management (SCM) is the process for identifying software configuration items (CIs), controlling the implementation and changes to software, recording and reporting the status of changes, and verifying the completeness and correctness of the released software. SCM consists of two major aspects: planning and implementation. Effective SCM involves planning for how activities are to be performed, and performing these activities in accordance with the Plan. This report first reviews the background of SCM that include key standards, SCM disciplines, SCM basic functions, baselines, software entity, SCM process, the implementation of SCM, and the tools of SCM. In turn, the report provides the guidelines for evaluating the SCM Plan for digital I and C systems of nuclear power plants. Most of the guidelines in the report are based on IEEE Std 828 and ANSI/IEEE Std 1042. According to BTP-14, NUREG-0800, the evaluation topics on the SCM Plan is classified into three categories: management, implementation, and resource characteristics

  8. Tactical resource allocation and elective patient admission planning in care processes.

    Science.gov (United States)

    Hulshof, Peter J H; Boucherie, Richard J; Hans, Erwin W; Hurink, Johann L

    2013-06-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and to use resources efficiently. This paper proposes a method to develop a tactical resource allocation and elective patient admission plan. These tactical plans allocate available resources to various care processes and determine the selection of patients to be served that are at a particular stage of their care process. Our method is developed in a Mixed Integer Linear Programming (MILP) framework and copes with multiple resources, multiple time periods and multiple patient groups with various uncertain treatment paths through the hospital, thereby integrating decision making for a chain of hospital resources. Computational results indicate that our method leads to a more equitable distribution of resources and provides control of patient access times, the number of patients served and the fraction of allocated resource capacity. Our approach is generic, as the base MILP and the solution approach allow for including various extensions to both the objective criteria and the constraints. Consequently, the proposed method is applicable in various settings of tactical hospital management.

  9. 75 FR 31711 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-04

    ... Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial... controlling nitrogen oxide (NOx) emissions from industrial boilers. This action is being taken under the Clean...--Control of Nitrogen Oxide Emissions from Industrial Boilers and Process Heaters at Petroleum Refineries in...

  10. The WIPP decision plan: Charting the course for openness in the decision making process

    International Nuclear Information System (INIS)

    Hagers, J.

    1992-01-01

    In June of 1989, the Secretary of Energy requested that a plan be developed that would clearly outline the prerequisites to opening the Waste Isolation Pilot Plant (WIPP). It was to provide the basis for a decision making process that was not only visible to the public, but one which included public participation. It must also be dynamic enough to effectively deal with the changing legislative, regulatory, and technical environments. Based on a recognized need for openness, the Secretary's Draft Decision Plan was developed. The plan charted the course for ultimately making the decision to declare WIPP ready to receive waste for the start of test phase operations. It outlined to critics and supporters alike the rigorous and thorough process by which the internal decisions were made. The plan identified all internal prerequisites to the decision; charted the review cycles, and targeted the completion dates. It also outlined the processes outside the control of the Department, institutional issues, such as legislative land withdrawal, issuance of permits, and designation of transportation routes

  11. 44 CFR 78.9 - Planning grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  12. Are pedestrians invisible in the planning process?

    DEFF Research Database (Denmark)

    Gemzøe, Lars

    2001-01-01

    The vehicular traffic is very visible in the planning process. One of the reasons is that there is always plenty of data on the problems of car traffic - but what about data on the pedestrians and their needs? Three major studies on people in public spaces in the Inner City of Copenhagen have...... supplied data that show the quantity, character and changes through 30 years of public life. People in Copenhagen have become visible in the planning process. cd-rom....

  13. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  14. Poster - Thur Eve - 29: Detecting changes in IMRT QA using statistical process control.

    Science.gov (United States)

    Drever, L; Salomons, G

    2012-07-01

    Statistical process control (SPC) methods were used to analyze 239 measurement based individual IMRT QA events. The selected IMRT QA events were all head and neck (H&N) cases with 70Gy in 35 fractions, and all prostate cases with 76Gy in 38 fractions planned between March 2009 and 2012. The results were used to determine if the tolerance limits currently being used for IMRT QA were able to indicate if the process was under control. The SPC calculations were repeated for IMRT QA of the same type of cases that were planned after the treatment planning system was upgraded from Eclipse version 8.1.18 to version 10.0.39. The initial tolerance limits were found to be acceptable for two of the three metrics tested prior to the upgrade. After the upgrade to the treatment planning system the SPC analysis found that the a priori limits were no longer capable of indicating control for 2 of the 3 metrics analyzed. The changes in the IMRT QA results were clearly identified using SPC, indicating that it is a useful tool for finding changes in the IMRT QA process. Routine application of SPC to IMRT QA results would help to distinguish unintentional trends and changes from the random variation in the IMRT QA results for individual plans. © 2012 American Association of Physicists in Medicine.

  15. Pathologic analysis of control plans for air pollution management in tehran metropolis: A qualitative study

    Directory of Open Access Journals (Sweden)

    Narges Salehi Shahrabi

    2013-01-01

    Full Text Available Background: Regarding the importance of air pollution issue for large cities, as Tehran metropolis, many plans, programs, projects and regulations have been developed to manage urban air pollution. However, most of them failed to decline the pollution. The purpose of this study is to pathologically analyze air-pollution control plans in order to offer effective solutions for Tehran metropolis. Methods: A qualitative content analysis and a semi-structured interview with 14 practicing professionals were used to identify key causes and sources of Tehran′s air pollution, to recognize challenges and obstacles towards effective performance of air-pollution control plans in this metropolitan area, and to suggest the most effective controlling solutions. Results: Challenges related to air-pollution control plans can be divided into two major categories: Firstly lack of integrated and organized stewardship and secondly those related to political, economical, social and technical environmental abbreviated as PEST, challenges. For effective control of the Tehran air pollution, the following eight controlling alternatives were identified: Systematization of plan preparation process, organizing the stewardship, standardization and utilization of new technologies and professional experts, cultural and infrastructural development, realization of social justice, developing coordination and controlling mechanisms, improving citizen′s participatory capacity, and focusing on effective management of fuel and energy. Conclusions: Controlling air pollution in Tehran should be considered as a priority for policymakers to make enforcements through applying a systemic cycle of preparation effective and comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders.

  16. 'Race', disadvantage, and policy processes in British planning

    OpenAIRE

    H Thomas; V Krishnarayan

    1994-01-01

    In this paper some of the mechanisms by which black and ethnic minorities can be put at a particular disadvantage within the planning system in Britain (and how these processes can be challenged) are examined. A number of types of policy processes operating in British planning are identified, and, drawing on a range of secondary and primary data, the influence of black and ethnic minorities within these processes are analysed. The paper is concluded with a review of the possibilities for the ...

  17. Intelligent control of a planning system for astronaut training.

    Science.gov (United States)

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  18. Mental fatigue and the control of cognitive processes : effects on perseveration and planning

    NARCIS (Netherlands)

    Van der Linden, D.; Frese, M; Meijman, T.F.

    We tested whether behavioural manifestations of mental fatigue may be linked to compromised executive control, which refers to the ability to regulate perceptual and motor processes for goal-directed behaviour. In complex tasks, compromised executive control may become manifest as decreased

  19. Hanford Waste Transfer Planning and Control - 13465

    Energy Technology Data Exchange (ETDEWEB)

    Kirch, N.W.; Uytioco, E.M.; Jo, J. [Washington River Protection Solutions, LLC, Richland, Washington (United States)

    2013-07-01

    Hanford tank waste cleanup requires efficient use of double-shell tank space to support single-shell tank retrievals and future waste feed delivery to the Waste Treatment and Immobilization Plant (WTP). Every waste transfer, including single-shell tank retrievals and evaporator campaign, is evaluated via the Waste Transfer Compatibility Program for compliance with safety basis, environmental compliance, operational limits and controls to enhance future waste treatment. Mixed radioactive and hazardous wastes are stored at the Hanford Site on an interim basis until they can be treated, as necessary, for final disposal. Implementation of the Tank Farms Waste Transfer Compatibility Program helps to ensure continued safe and prudent storage and handling of these wastes within the Tank Farms Facility. The Tank Farms Waste Transfer Compatibility Program is a Safety Management Program that is a formal process for evaluating waste transfers and chemical additions through the preparation of documented Waste Compatibility Assessments (WCA). The primary purpose of the program is to ensure that sufficient controls are in place to prevent the formation of incompatible mixtures as the result of waste transfer operations. The program defines a consistent means of evaluating compliance with certain administrative controls, safety, operational, regulatory, and programmatic criteria and specifies considerations necessary to assess waste transfers and chemical additions. Current operations are most limited by staying within compliance with the safety basis controls to prevent flammable gas build up in the tank headspace. The depth of solids, the depth of supernatant, the total waste depth and the waste temperature are monitored and controlled to stay within the Compatibility Program rules. Also, transfer planning includes a preliminary evaluation against the Compatibility Program to assure that operating plans will comply with the Waste Transfer Compatibility Program. (authors)

  20. A Collaborative, Ongoing University Strategic Planning Framework: Process, Landmines, and Lessons

    Science.gov (United States)

    Hill, Susan E. Kogler; Thomas, Edward G.; Keller, Lawrence F.

    2009-01-01

    This article examines the strategic planning process at Cleveland State University, a large metropolitan state university in Ohio. A faculty-administrative team used a communicative planning approach to develop a collaborative, ongoing, bottom-up, transparent strategic planning process. This team then spearheaded the process through plan…

  1. OSUL2013: Fostering Organizational Change through a Grassroots Planning Process

    Science.gov (United States)

    Schlosser, Melanie

    2011-01-01

    This paper provides background on planning and organizational culture change in libraries and describes a grassroots planning process taking place at the Ohio State University Libraries. Now in its third phase, the process aims to create a long-term plan for the organization while fostering a more collaborative, innovative culture.

  2. Classification of risks in the process of financial planning

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2017-12-01

    Full Text Available The essence of the concept «risk» in the process of financial planning is studied. The classification of risks was conducted. The article provides the full enough and detailed system of classification of risks in the process of financial planning. The author researches and provides the factors, which directly influence upon the size of risks, which accompany the process of financial planning. A complete set of isolated independent features was determined for each risk type. It was found out that a part of features depends only on the risk type and the other part is determined by the character of a risky situation. The article substantiates the presence of indeterminacy typical for dynamic and non-stationary environment and the risks of different nature and strength of influence on the efficiency of financial planning, which cause the necessity to develop and implement the effective system of financial planning at an enterprise.

  3. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  4. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  5. Interactive urban design using integrated planning requirements control

    NARCIS (Netherlands)

    Vries, de B.; Tabak, V.; Achten, H.H.

    2005-01-01

    Urban planning and urban design are separated disciplines. As a consequence, there is hardly any feedback from the urban design process to the urban planning process. To improve interaction between these two, an interactive urban design (IUD) tool has been developed. The tool is implemented in a

  6. Care plans and care planning in the management of long-term conditions in the UK: a controlled prospective cohort study.

    Science.gov (United States)

    Reeves, David; Hann, Mark; Rick, Jo; Rowe, Kelly; Small, Nicola; Burt, Jenni; Roland, Martin; Protheroe, Joanne; Blakeman, Tom; Richardson, Gerry; Kennedy, Anne; Bower, Peter

    2014-09-01

    In the UK, the use of care planning and written care plans has been proposed to improve the management of long-term conditions, yet there is limited evidence concerning their uptake and benefits. To explore the implementation of care plans and care planning in the UK and associations with the process and outcome of care. A controlled prospective cohort study among two groups of patients with long-term conditions who were similar in demographic and clinical characteristics, but who were registered with general practices varying in their implementation of care plans and care planning. Implementation of care plans and care planning in general practice was assessed using the 2009-2010 GP Patient Survey, and relationships with patient outcomes (self-management and vitality) were examined using multilevel, mixed effects linear regression modelling. The study recruited 38 practices and 2439 patients. Practices in the two groups (high and low users of written documents) were similar in structural and population characteristics. Patients in the two groups of practices were similar in demographics and baseline health. Patients did demonstrate significant differences in reported experiences of care planning, although the differences were modest. Very few patients in the cohort reported a written plan that could be confirmed. Analysis of outcomes suggested that most patients show limited change over time in vitality and self-management. Variation in the use of care plans at the practice level was very limited and not related to patient outcomes over time. The use of written care plans in patients with long-term conditions is uncommon and unlikely to explain a substantive amount of variation in the process and outcome of care. More proactive efforts at implementation may be required to provide a rigorous test of the potential of care plans and care planning. © British Journal of General Practice 2014.

  7. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  8. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  9. A modularized framework for sales and operations planning with focus on process industries

    Directory of Open Access Journals (Sweden)

    Sayeh Noroozi

    2016-01-01

    Full Text Available This paper suggests a modularized sales and operations planning (S&OP framework, consisting of content and process. The framework’s content is based on a typology of decoupling points in which the effect of decoupling points on the decision variables in S&OP is studied. The framework’s process takes a step back and addresses the need for a more elaborate design to precede the operational use of S&OP content for different production contexts. The framework supports both process industries (PIs and discrete manufacturing industries (DIs, and recognizes their specific requirements and reflects them in their S&OP. The differentiating characteristics of PIs and DIs are emphasized through three different decoupling points, namely: discretization decoupling point, control mode decoupling point, and customer order decoupling point. The suggested framework aims to fill the gap in the literature regarding the lack of aggregate planning processes that match the PIs’ specific requirements by reflecting the differentiating characteristics of PIs in S&OP.

  10. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  11. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  12. Quality control of brachytherapy system module Oncentra MasterPlan V3.3 planning; Control de calidad del modulo de braquiterapia del sistema de planificacion Oncentra MasterPlan V3.3

    Energy Technology Data Exchange (ETDEWEB)

    Monja Ray, P. de la; Torres Pozas, S.; Sanchez Carrascal, M.; Macias Verde, D.; Martin Oliva, R.

    2011-07-01

    We present the results of quality control carried out the planning system (SP) MasterPlan Oncentra Brachy, version 3.3 (Nucletron), on the occasion of its launch, following the recommendations proposed in the Protocol for quality control in planning systems therapy with ionizing radiation [SEFM, published by the Spanish Society of Medical Physics (SEFM) in 2005].

  13. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  14. Pathologic Analysis of Control Plans for Air Pollution Management in Tehran Metropolis: A Cross-Sectional Study.

    Science.gov (United States)

    Salehi Shahrabi, Narges; Pourezzat, Aliasghar; Mobaraki, Hossein; Mafimoradi, Shiva

    2013-11-01

    The centralization of human activities is associated with different pollutants which enter into environment easily and cause the urban environment more vulnerable. Regarding the importance of air pollution issue for Tehran metropolis, many plans and regulations have been developed. However, most of them failed to decline the pollution. The purpose of this study was to pathologically analyze air-pollution control plans to offer effective solutions for Tehran metropolis. A Qualitative content analysis in addition to a semi-structured interview with 14 practicing professional were used to identify 1) key sources of Tehran's air pollution, 2) recognize challenges towards effective performance of pertinent plans and 3), offer effective solutions. Related challenges to air-pollution control plans can be divided into two major categories including lack of integrated and organized stewardship and PEST challenges. For controlling the air pollution of Tehran effectively, various controlling alternatives were identified as systematization of plan preparation process, standardization and utilization of new technologies & experts, infrastructural development, realization of social justice, developing coordination mechanisms, improving citizens' participatory capacity and focusing on effective management of fuel and energy. Controlling air pollution in Tehran needs a serious attention of policymakers to make enforcements through applying a systemic cycle of preparation comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders.

  15. Strategic planning processes and financial performance among hospitals in Lebanon.

    Science.gov (United States)

    Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher

    2013-01-01

    Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.

  16. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  17. Status and development of process control engineering. Stand und Entwicklung der Prozessleittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Gilson, W [ed.

    1986-01-01

    Process control systems are generally accepted in process engineering and power plant engineering. The book attempts to take stock of the overall automation concept, of the system components, and of the trends of development. Particular interest is taken in project management, as this is where modifications have had the strongest effect on job scheduling and operations planning. The book intends to give experts and other interested readers an outline of the structure of process control systems and an idea of how process control systems can be integrated in an overall concept of production automation. All relevant aspects are mentioned, and the state of the art and development trends are outlined.

  18. Audit of an automated checklist for quality control of radiotherapy treatment plans

    International Nuclear Information System (INIS)

    Breen, Stephen L.; Zhang Beibei

    2010-01-01

    Purpose: To assess the effect of adding an automated checklist to the treatment planning process for head and neck intensity-modulated radiotherapy. Methods: Plans produced within our treatment planning system were evaluated at the planners' discretion with an automated checklist of more than twenty planning parameters. Plans were rated as accepted or rejected for treatment, during regular review by radiation oncologists and physicists as part of our quality control program. The rates of errors and their types were characterised prior to the implementation of the checklist and with the checklist. Results: Without the checklist, 5.9% of plans were rejected; the use of the checklist reduced the rejection rate to 3.1%. The checklist was used for 64.7% of plans. Pareto analysis of the causes of rejection showed that the checklist reduced the number of causes of rejections from twelve to seven. Conclusions: The use of an automated checklist has reduced the need for reworking of treatment plans. With the use of the checklist, most rejections were due to errors in prescription or inadequate dose distributions. Use of the checklist by planners must be increased to maximise improvements in planning efficiency.

  19. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  20. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  1. Potential use of advanced process control for safety purposes during attack of a process plant

    International Nuclear Information System (INIS)

    Whiteley, James R.

    2006-01-01

    Many refineries and commodity chemical plants employ advanced process control (APC) systems to improve throughputs and yields. These APC systems utilize empirical process models for control purposes and enable operation closer to constraints than can be achieved with traditional PID regulatory feedback control. Substantial economic benefits are typically realized from the addition of APC systems. This paper considers leveraging the control capabilities of existing APC systems to minimize the potential impact of a terrorist attack on a process plant (e.g., petroleum refinery). Two potential uses of APC are described. The first is a conventional application of APC and involves automatically moving the process to a reduced operating rate when an attack first begins. The second is a non-conventional application and involves reconfiguring the APC system to optimize safety rather than economics. The underlying intent in both cases is to reduce the demands on the operator to allow focus on situation assessment and optimal response planning. An overview of APC is provided along with a brief description of the modifications required for the proposed new applications of the technology

  2. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hurlbut, David J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-05

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansion planning and renewable energy generation planning.

  3. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  4. Newly Developed Software Application for Multiple Access Process Planning

    Directory of Open Access Journals (Sweden)

    Katarina Monkova

    2014-11-01

    Full Text Available The purchase of a complex system for computer aided process planning (CAPP can be expensive for little and some middle sized plants, sometimes an inaccessible investment, with a long recoupment period. According to this fact and the author's experience with Eastern European plants, they decided to design a new database application which is suitable for production, stock, and economic data holding as well as processing and exploitation within the manufacturing process. The application can also be used to process a plan according to the selected criteria, for technological documentation and NC program creation. It was based on the theory of a multivariant approach to computer aided plan generation. Its fundamental features, the internal mathematical structure and new code system of processed objects, were prepared by the authors. The verification of the designed information system in real practice has shown that it enables about 30% cost and production time reduction and decreases input material assortment variability.

  5. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  6. Contamination control plan for prelaunch operations

    Science.gov (United States)

    Austin, J. D.

    1983-01-01

    A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.

  7. Computer Security: Governmentwide Planning Process Had Limited Impact. Report to the Chairman, Committee on Science, Space, and Technology, House of Representatives.

    Science.gov (United States)

    General Accounting Office, Washington, DC. Information Management and Technology Div.

    As required by the Computer Security Act of 1987, federal agencies have to identify systems that contain sensitive information and develop plans to safeguard them. The planning process was assessed in 10 civilian agencies as well as the extent to which they had implemented planning controls described in 22 selected plans. The National Institute of…

  8. The space shuttle payload planning working groups: Volume 9: Materials processing and space manufacturing

    Science.gov (United States)

    1973-01-01

    The findings and recommendations of the Materials Processing and Space Manufacturing group of the space shuttle payload planning activity are presented. The effects of weightlessness on the levitation processes, mixture stability, and control over heat and mass transport in fluids are considered for investigation. The research and development projects include: (1) metallurgical processes, (2) electronic materials, (3) biological applications, and (4)nonmetallic materials and processes. Additional recommendations are provided concerning the allocation of payload space, acceptance of experiments for flight, flight qualification, and private use of the space shuttle.

  9. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  10. Emergency-control planning in the vicinity of large-scale technical plants

    International Nuclear Information System (INIS)

    Lindackers, K.H.

    1982-01-01

    In 7 theses, the author shows the most important aspects of disaster control planning: 1) The planning of disaster control measures should not be the object of a licencing procedure. 2) On site allocation or planned determination of sites for potentially hazardous plants it shall be examined whether disaster control measures can be performed sufficiently. 3) Planning of disaster control measures must not be based on detailed accident scenarios. 4) It should be limited to a few day's duration after the accident has occurred. 5) Special attention should be dedicated to the problems of - information and communications, - decision-taking procedures and translation of decicions into action, - practical realization of measures. 6) The bodies charged with planning and implementation must have appropriate personnel and material. 7) Only adequate exercises can guarantee planned disaster control measures to engage under conditions of severity. (HSCH) [de

  11. The BUMP model of response planning: intermittent predictive control accounts for 10 Hz physiological tremor.

    Science.gov (United States)

    Bye, Robin T; Neilson, Peter D

    2010-10-01

    Physiological tremor during movement is characterized by ∼10 Hz oscillation observed both in the electromyogram activity and in the velocity profile. We propose that this particular rhythm occurs as the direct consequence of a movement response planning system that acts as an intermittent predictive controller operating at discrete intervals of ∼100 ms. The BUMP model of response planning describes such a system. It forms the kernel of Adaptive Model Theory which defines, in computational terms, a basic unit of motor production or BUMP. Each BUMP consists of three processes: (1) analyzing sensory information, (2) planning a desired optimal response, and (3) execution of that response. These processes operate in parallel across successive sequential BUMPs. The response planning process requires a discrete-time interval in which to generate a minimum acceleration trajectory to connect the actual response with the predicted future state of the target and compensate for executional error. We have shown previously that a response planning time of 100 ms accounts for the intermittency observed experimentally in visual tracking studies and for the psychological refractory period observed in double stimulation reaction time studies. We have also shown that simulations of aimed movement, using this same planning interval, reproduce experimentally observed speed-accuracy tradeoffs and movement velocity profiles. Here we show, by means of a simulation study of constant velocity tracking movements, that employing a 100 ms planning interval closely reproduces the measurement discontinuities and power spectra of electromyograms, joint-angles, and angular velocities of physiological tremor reported experimentally. We conclude that intermittent predictive control through sequential operation of BUMPs is a fundamental mechanism of 10 Hz physiological tremor in movement. Copyright © 2010 Elsevier B.V. All rights reserved.

  12. Control y seguimiento del plan de seguridad e higiene en el trabajo de edificación

    Directory of Open Access Journals (Sweden)

    Pérez Guerra, Alfonso

    1993-02-01

    Full Text Available All of the follow-up process is laid down with precision in a clear and impeccable report This makes it possible to prove that in the Process of Execution of Works, everything planned in the Safety Study and Developed in the subsequent Safety Plan is covered.

    En un trabajo claro e impecable se plasma con precisión todo el proceso de seguimiento y control que permite acreditar que, en el Proceso de Ejecución de Obra, se cubre todo lo planeado en el Estudio de Seguridad y, a su vez, se ha desarrollado en el posterior Plan de Seguridad.

  13. Linking Planning and Budgeting through Business Process Redesign.

    Science.gov (United States)

    Inman, Marianne E.

    In the wake of an extensive strategic planning process that refocused institutional values at Northland College, Wisconsin, the administration undertook linking the budget with the newly articulated plan. Incremental budgeting was no longer feasible, and the new budget would have to reflect streamlining and new ways of functioning. Consequently…

  14. Data management and processing plan, Department of Applied Geodesy

    International Nuclear Information System (INIS)

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL

  15. Module generator of plans for dynamic processes; Modulo generdor de planes para procesos dinamicos

    Energy Technology Data Exchange (ETDEWEB)

    Reyes B, Alberto; Fernandez J, Jose L [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2002-07-01

    This work describes the generating module of plans (Geplan) as a part of the project: Development of Techniques of Intelligent Planning for Dynamic Processes, based on techniques of artificial intelligence, and that is being developed in the Gerencia de Control e Instrumentacion the Instituto de Investigaciones Electricas (IIE). The study case corresponds to the elaboration of a plan to help the plant operators in the task of taking a combined cycle central (CCC) to a stable state of operation given a specific load level. The architecture of the module generator of plans is presented and the codification of the actions allowed (ACT) is illustrated by means of rules, in addition the challenges that are due to face so that the system operates in line with the process. Also the technical aspects of the generator of plans, as well as the benefits and expectations of their use in any CCC are mentioned. [Spanish] En este trabajo se describe el modulo generador de planes (Geplan) como parte del proyecto Desarrollo de Tecnicas de Planificacion Inteligente para Procesos Dinamicos, basado en tecnicas de inteligencia Artificial, y que estan desarrollandose en la Gerencia de Control e Instrumentacion del Instituto de Investigaciones Electrica (IIE). El caso de estudio corresponde a la elaboracion de un plan para asistir a los operadores de planta en la tarea de llevar una central de ciclo combinado (CCC) a un estado estable de operacion dedo un nivel de carga especifico. Se presenta la arquitectura del modulo generador de planes y se ilustra la codificacion de las acciones permitidas (ACT) mediante reglas, ademas los retos que se deben enfrentar para que el sistema opere en linea con el proceso. Tambien se mencionan los aspectos tecnicos del generador de planes, asi como los beneficios y expectativas de su uso en cualquier CCC.

  16. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  17. A Strategic Planning Process Model for Distance Education

    Science.gov (United States)

    Pisel, Kenneth P.

    2008-01-01

    As more institutions seek to implement or expand distance learning programs, it becomes critical to integrate distance learning programs into broader strategic visions and plans. Using the informed opinion from a panel of peer-nominated experts via iterative Delphi questionnaires, a 10-phased strategic planning process model for distance education…

  18. Innovation Process Planning Model in the Bpmn Standard

    Directory of Open Access Journals (Sweden)

    Jurczyk-Bunkowska Magdalena

    2013-12-01

    Full Text Available The aim of the article is to show the relations in the innovation process planning model. The relations argued here guarantee the stable and reliable way to achieve the result in the form of an increased competitiveness by a professionally directed development of the company. The manager needs to specify the effect while initiating the realisation of the process, has to be achieved this by the system of indirect goals. The original model proposed here shows the standard of dependence between the plans of the fragments of the innovation process which make up for achieving its final goal. The relation in the present article was shown by using the standard Business Process Model and Notation. This enabled the specification of interrelations between the decision levels at which subsequent fragments of the innovation process are planned. This gives the possibility of a better coordination of the process, reducing the time needed for the achievement of its effect. The model has been compiled on the basis of the practises followed in Polish companies. It is not, however, the reflection of these practises, but rather an idealised standard of proceedings which aims at improving the effectiveness of the management of innovations on the operational level. The model shown could be the basis of the creation of systems supporting the decision making, supporting the knowledge management or those supporting the communication in the innovation processes.

  19. Robust path planning for flexible needle insertion using Markov decision processes.

    Science.gov (United States)

    Tan, Xiaoyu; Yu, Pengqian; Lim, Kah-Bin; Chui, Chee-Kong

    2018-05-11

    Flexible needle has the potential to accurately navigate to a treatment region in the least invasive manner. We propose a new planning method using Markov decision processes (MDPs) for flexible needle navigation that can perform robust path planning and steering under the circumstance of complex tissue-needle interactions. This method enhances the robustness of flexible needle steering from three different perspectives. First, the method considers the problem caused by soft tissue deformation. The method then resolves the common needle penetration failure caused by patterns of targets, while the last solution addresses the uncertainty issues in flexible needle motion due to complex and unpredictable tissue-needle interaction. Computer simulation and phantom experimental results show that the proposed method can perform robust planning and generate a secure control policy for flexible needle steering. Compared with a traditional method using MDPs, the proposed method achieves higher accuracy and probability of success in avoiding obstacles under complicated and uncertain tissue-needle interactions. Future work will involve experiment with biological tissue in vivo. The proposed robust path planning method can securely steer flexible needle within soft phantom tissues and achieve high adaptability in computer simulation.

  20. Tuberculosis control: decentralization, local planning and management specificities.

    Science.gov (United States)

    Trigueiro, Janaína Von Söhsten; Nogueira, Jordana de Almeida; de Sá, Lenilde Duarte; Palha, Pedro Fredemir; Villa, Tereza Cristina Scatena; Trigueiro, Débora Raquel Soares Guedes

    2011-01-01

    The goal was to analyze, according to the perception of health managers, the practices that guide tuberculosis control actions in cities in the metropolitan region of João Pessoa - PB, Brazil. This qualitative study involved eight professionals in management functions. Testimonies were collected through semi-structured interviews between May and June 2009 and organized through content analysis. Despite the acknowledged benefits of tuberculosis control action decentralization, local planning indicates the predominance of a bureaucratic model that is restricted to negotiation and supplies. Local programming is centered on the coordinator, which shows a command line and vertical management that lead to the fragmentation of the work process. Management action should follow an innovative and transformative route that surpasses bureaucratic barriers and faces the biggest challenge it is proposed: to balance professional interrelations with a view to improving health work performance.

  1. Developing cancer control plans in Africa: examples from five countries.

    Science.gov (United States)

    Stefan, Daniela Cristina; Elzawawy, Ahmed M; Khaled, Hussein M; Ntaganda, Fabien; Asiimwe, Anita; Addai, Beatrice Wiafe; Wiafe, Seth; Adewole, Isaac F

    2013-04-01

    The creation and implementation of national cancer control plans is becoming increasingly necessary for countries in Africa, with the number of new cancer cases per year in the continent expected to reach up to 1·5 million by 2020. Examples from South Africa, Egypt, Nigeria, Ghana, and Rwanda describe the state of national cancer control plans and their implementation. Whereas in Rwanda the emphasis is on development of basic facilities needed for cancer care, in those countries with more developed economies, such as South Africa and Nigeria, the political will to fund national cancer control plans is limited, even though the plans exist and are otherwise well conceived. Improved awareness of the increasing burden of cancer and increased advocacy are needed to put pressure on governments to develop, fund, and implement national cancer control plans across the continent. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. Achieving performance breakthroughs in an HMO business process through quality planning.

    Science.gov (United States)

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  3. Patient geometry-driven information retrieval for IMRT treatment plan quality control

    International Nuclear Information System (INIS)

    Wu Binbin; Ricchetti, Francesco; Sanguineti, Giuseppe; Kazhdan, Misha; Simari, Patricio; Chuang Ming; Taylor, Russell; Jacques, Robert; McNutt, Todd

    2009-01-01

    Purpose: Intensity modulated radiation therapy (IMRT) treatment plan quality depends on the planner's level of experience and the amount of time the planner invests in developing the plan. Planners often unwittingly accept plans when further sparing of the organs at risk (OARs) is possible. The authors propose a method of IMRT treatment plan quality control that helps planners to evaluate the doses of the OARs upon completion of a new plan. Methods: It is achieved by comparing the geometric configurations of the OARs and targets of a new patient with those of prior patients, whose plans are maintained in a database. They introduce the concept of a shape relationship descriptor and, specifically, the overlap volume histogram (OVH) to describe the spatial configuration of an OAR with respect to a target. The OVH provides a way to infer the likely DVHs of the OARs by comparing the relative spatial configurations between patients. A database of prior patients is built to serve as an external reference. At the conclusion of a new plan, planners search through the database and identify related patients by comparing the OAR-target geometric relationships of the new patient with those of prior patients. The treatment plans of these related patients are retrieved from the database and guide planners in determining whether lower doses delivered to the OARs in the new plan are feasible. Results: Preliminary evaluation is promising. In this evaluation, they applied the analysis to the parotid DVHs of 32 prior head-and-neck patients, whose plans are maintained in a database. Each parotid was queried against the other 63 parotids to determine whether a lower dose was possible. The 17 parotids that promised the greatest reduction in D 50 (DVH dose at 50% volume) were flagged. These 17 parotids came from 13 patients. The method also indicated that the doses of the other nine parotids of the 13 patients could not be reduced, so they were included in the replanning process as

  4. Enterprise resource planning for hospitals.

    Science.gov (United States)

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.

  5. Representation in the Care Planning Process for Nursing Home Residents With Dementia.

    Science.gov (United States)

    McCreedy, Ellen; Loomer, Lacey; Palmer, Jennifer A; Mitchell, Susan L; Volandes, Angelo; Mor, Vincent

    2018-05-01

    Federally mandated assessments of nursing home (NH) residents drive individualized care planning. Residents with cognitive impairment may not be able to meaningfully communicate their care needs and preferences during this process-a gap that may be partially addressed by involving surrogates. We describe the prevalence of family participation in the care planning process for long-stay NH residents with varying degrees of cognitive impairment. Retrospective study using administrative data made available as part of an ongoing pragmatic cluster randomized controlled trial. A total of 292 NHs from 1 large for-profit NH system. Long-stay NH residents in 2016. We identified all care planning assessments conducted in 2016 for long-stay NH residents. Cognitive functioning was defined using the Cognitive Function Scale. The Minimum Data Set was used to determine whether a resident, family member, and/or legal guardian participated in the assessment process. Certification and Survey Provider Enhance Reporting system data was used to identify facility-level correlates of family participation. Bivariate and multivariable hierarchical regression results are presented. The analytic sample included 18,552 long-stay NH residents. Family member/representative participation varied by degree of resident cognitive impairment; 8% of residents with no cognitive impairment had family or representative participation in care planning during 2016, compared with 26% of residents with severe impairment. NHs with more social workers had greater family participation in care planning. Available NH characteristics do not explain most of the variation in family participation between NHs (residual intraclass correlation = .57). Only a minority of family members and surrogates participate in NH care planning, even for residents with severe cognitive impairment. The association between social work staffing and participation suggests family involvement may be a measure of quality improvement

  6. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  7. Parallel and distributed processing in power system simulation and control

    Energy Technology Data Exchange (ETDEWEB)

    Falcao, Djalma M [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia

    1994-12-31

    Recent advances in computer technology will certainly have a great impact in the methodologies used in power system expansion and operational planning as well as in real-time control. Parallel and distributed processing are among the new technologies that present great potential for application in these areas. Parallel computers use multiple functional or processing units to speed up computation while distributed processing computer systems are collection of computers joined together by high speed communication networks having many objectives and advantages. The paper presents some ideas for the use of parallel and distributed processing in power system simulation and control. It also comments on some of the current research work in these topics and presents a summary of the work presently being developed at COPPE. (author) 53 refs., 2 figs.

  8. Implementation of imaging of the national protocol for quality control in planning systems; Implementacion de pruebas de imagen del protocolo nacional de control de calidad en sistemas de planificacion

    Energy Technology Data Exchange (ETDEWEB)

    Caudepon Moreno, F.; Martin-Viera cueto, J. A.; Bodineau gil, C.; Benitez Villegas, E. M.; Casado Villalon, F. J.; Moreno Sainz, C.

    2011-07-01

    Quality control of the planning system (SP) plays a key role in quality assurance schemes that include all stages of the radiotherapy process.In this work we focus on the evidence detailing the {sup P}rotocol for quality control in therapy planning systems with ionizing radiation of the SEFM in {sup a}natomical data acquisition (DA).

  9. Control Design for Untimed Petri Nets Using Markov Decision Processes

    Directory of Open Access Journals (Sweden)

    Cherki Daoui

    2017-01-01

    Full Text Available Design of control sequences for discrete event systems (DESs has been presented modelled by untimed Petri nets (PNs. PNs are well-known mathematical and graphical models that are widely used to describe distributed DESs, including choices, synchronizations and parallelisms. The domains of application include, but are not restricted to, manufacturing systems, computer science and transportation networks. We are motivated by the observation that such systems need to plan their production or services. The paper is more particularly concerned with control issues in uncertain environments when unexpected events occur or when control errors disturb the behaviour of the system. To deal with such uncertainties, a new approach based on discrete time Markov decision processes (MDPs has been proposed that associates the modelling power of PNs with the planning power of MDPs. Finally, the simulation results illustrate the benefit of our method from the computational point of view. (original abstract

  10. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  11. Linking the Teacher Appraisal Process to the School Improvement Plan

    Science.gov (United States)

    Reddekopp, Therese

    2007-01-01

    If a school improvement plan includes input from all stakeholders and focuses on data-driven processes that are linked to teacher appraisal, it can be powerful in leading the school toward the common mission of achieving student success. Linking the school improvement plan to the teacher appraisal process creates a system whereby all individuals…

  12. Probabilistic safety assessment and optimal control of hazardous technological systems. A marked point process approach

    International Nuclear Information System (INIS)

    Holmberg, J.

    1997-04-01

    The thesis models risk management as an optimal control problem for a stochastic process. The approach classes the decisions made by management into three categories according to the control methods of a point process: (1) planned process lifetime, (2) modification of the design, and (3) operational decisions. The approach is used for optimization of plant shutdown criteria and surveillance test strategies of a hypothetical nuclear power plant

  13. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    the issues specific to the later assessment (ETL 1110-3-407, pp 1-9 to 1-10). Under the : estructured master planning process discussed in this report...Lisa~m 0111utHars M143 AMW PRO*b LAMM~e 0)3. AMW uaides, Uso ~ow (M Port RJ." 21719 7%s pubhicaton was repfodaaced on moycled V&Mp. /| / 121 DATEI:

  14. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  15. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  16. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  17. Training change control process at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, Cornelia Mariana

    2005-01-01

    The paper presents the process of 'Training Change Control' at Cernavoda NPP. This process is a systematic approach that allows determination of the most effective training and/or non-training solutions for challenges that may influence the content and conditions for a training program or course. Changes may be the result of: - response to station systems or equipment modifications; - new or revised procedures; - regulatory requirements; - external organizations requirements; - internal evaluations meaning feedback from trainees, trainers, management or post-training evaluations; - self-assessments; - station condition reports; - operating experience (OPEX); - modifications of job scope; - management input. The Training Change Control Process at Cernavoda NPP includes the following aspects. The first step is the identification of all the initiating factors for a potential training change. Then, retain only those, which could have an impact on training and classify them in two categories: as deficiencies or as enhancement suggestions. The process is different for the two categories. The deficiency category supposes the application of the Training Needs Analysis (TNA) process. This is a performance-oriented process, resulting in more competent employees, solving existing and potential performance problems. By using needs analysis to systematically determine what people or courses and programs are expected to do and gathering data to reveal what they are really doing, we can receive a clear picture of the problem and then we can establish corrective action plans to fix it. The process is supported by plant subjects matter and by training specialists. On the other hand, enhancements suggestions are assessed by designated experienced persons and then are implemented in the training process. Regarding these two types of initiating factors for the training change control process, the final result consists of a training improvement, raising the effectiveness, efficiency or

  18. Mechanistic Fermentation Models for Process Design, Monitoring, and Control

    DEFF Research Database (Denmark)

    Mears, Lisa; Stocks, Stuart M.; Albæk, Mads Orla

    2017-01-01

    Mechanistic models require a significant investment of time and resources, but their application to multiple stages of fermentation process development and operation can make this investment highly valuable. This Opinion article discusses how an established fermentation model may be adapted...... for application to different stages of fermentation process development: planning, process design, monitoring, and control. Although a longer development time is required for such modeling methods in comparison to purely data-based model techniques, the wide range of applications makes them a highly valuable tool...... for fermentation research and development. In addition, in a research environment, where collaboration is important, developing mechanistic models provides a platform for knowledge sharing and consolidation of existing process understanding....

  19. Standard Practice for Preparation of Aerospace Contamination Control Plans

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): 1.1.1 Cleanliness requirements for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations. 1.1.2 Implementation plans to achieve, verify, and maintain the specified cleanliness re...

  20. Quality Assurance/Quality Control Issues for Intraoperative Planning and Adaptive Repeat Planning of Image-Guided Prostate Implants

    International Nuclear Information System (INIS)

    Zaider, Marco; Cohen, Gilad; Meli, Jerome; Rosenfeld, Anatoly B.

    2008-01-01

    The quality assurance/quality control purpose is this. We design a treatment plan, and we wish to be as certain as reasonably possible that the treatment is delivered as planned. In the case of conventionally planned prostate brachytherapy, implementing to the letter the implantation plan is rarely attainable and therefore can require adaptive replanning (a quality control issue). The reasons for this state of affairs include changes in the prostate shape and volume during implantation and treatment delivery (e.g., edema resolution) and unavoidable inaccuracy in the placement of the seeds in the prostate. As a result, quality-control activities (e.g., the need to monitor-ideally, on the fly-the target and urethral and rectal dosage) must be also addressed

  1. Renewable Energy Zone (REZ) Transmission Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-08

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  2. Peer-to-Peer Planning for Space Mission Control

    Science.gov (United States)

    Barreiro, Javier; Jones, Grailing, Jr.; Schaffer, Steve

    2009-01-01

    Planning and scheduling for space operations entails the development of applications that embed intimate domain knowledge of distinct areas of mission control, while allowing for significant collaboration among them. The separation is useful because of differences in the planning problem, solution methods, and frequencies of replanning that arise in the different disciplines. For example, planning the activities of human spaceflight crews requires some reasoning about all spacecraft resources at timescales of minutes or seconds, and is subject to considerable volatility. Detailed power planning requires managing the complex interplay of power consumption and production, involves very different classes of constraints and preferences, but once plans are generated they are relatively stable.

  3. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  4. [The control of urban growth in Mexico City. Suppositions regarding poor planning].

    Science.gov (United States)

    Aguilar, A G; Olvera, G

    1991-01-01

    It is argued that mechanisms for planning land use and controlling urban expansion in Mexico City have failed to achieve their aims. Although in theory Mexico's urban planning process has recently attempted to go beyond purely physical aspects to include socioeconomic dimensions, it has in fact been inflexible and oriented to exclusively to technical and administrative aspects, to the detriment of social distribution goals. Planning instruments have not included important aspects such as specific mechanisms for altering employment structures or income levels or mechanisms for providing access to land or housing to the most disadvantaged groups. The urban planning process in Mexico City, instead of assuming a socially compensatory role in favor of disadvantaged groups, has maintained the status quo or discriminated in favor of the already advantaged. The spatial and technical orientation or urban planning in Mexico City does not leave room for a well-defined social policy. The population of the Mexico City metropolitan Zone increased from 3 million in 1950 to 18 million in 1985, while its total area increased from 11,750 hectares in 1940 to 125,000 in 1985. Transfer of population from the Federal District to the conurban municipios of the state of Mexico has been very significant since the 1970s. Around 20% of the total area of metropolitan Mexico City has been settled through illegal means, with communal and ejido lands accounting for a large share. Settlements on some 60% of lands in metroplitan Mexico City were illegal or irregular at some time. Low income housing is the cheapest form for the government because the frequently illegal status of settlers prevents them from making any demands for services or equipment for the 1st several years. Construction is undertaken and financed almost entirely by the settlers themselves, freeing the government of responsibility in regard to the constitutionally mandated right of all Mexicans to housing. The Urban Development

  5. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  6. Process control device

    International Nuclear Information System (INIS)

    Hayashi, Toshifumi; Kobayashi, Hiroshi.

    1994-01-01

    A process control device comprises a memory device for memorizing a plant operation target, a plant state or a state of equipments related with each other as control data, a read-only memory device for storing programs, a plant instrumentation control device or other process control devices, an input/output device for performing input/output with an operator, and a processing device which conducts processing in accordance with the program and sends a control demand or a display demand to the input/output device. The program reads out control data relative to a predetermined operation target, compares and verify them with actual values to read out control data to be a practice premise condition which is further to be a practice premise condition if necessary, thereby automatically controlling the plant or requiring or displaying input. Practice presuming conditions for the operation target can be examined succesively in accordance with the program without constituting complicated logical figures and AND/OR graphs. (N.H.)

  7. Goal planning: a retrospective audit of rehabilitation process and outcome.

    Science.gov (United States)

    Duff, Jane; Evans, Matthew J; Kennedy, Paul

    2004-05-01

    To consider the effectiveness of a goal planning programme for people with spinal cord injury (SCI) and address some of the current evidence gaps in goal setting. Retrospective audit. Consecutive series of 65 newly injured SCI patients. The Needs Assessment Checklist (NAC) has been specifically developed for the SCI population, and is used to assess patient attainment in core rehabilitation areas. A 'Goal Planning Progress' form was also used to specifically detail the goal planning process. Across the 65 patients, 396 goal planning meetings were held with 6176 goals set in total. Seventy-two per cent of the goals set at the first goal planning meeting were achieved by the second meeting. The rate of achievement at subsequent meetings was 68%. Significant differences in the number of planned rehabilitation days, number of goal planning meetings, and goals set were identified between injury categories. Significant positive correlations were found between the number of goals set and achievement, as measured by the NAC, in certain rehabilitation domains. The findings of this study demonstrate that the Needs Assessment and Goal Planning framework is effective in planning SCI rehabilitation. The capacity of this goal planning system to reflect individual need has also been established. Further systematic analyses of this process could potentially lead to more efficient rehabilitation and the identification of care pathways within clinical areas.

  8. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  9. Control mechanisms in the third-generation planning. Case study: Control to realize sustainable cities

    Science.gov (United States)

    Wicaksono, A. D.

    2017-06-01

    Since the last few years, Indonesia has experienced important events that bring significant changes to the social, political and economic life. The changes directly or indirectly impact the field of planning. With the challenging condition which grows fast and is more complex ahead, and the greater demands on the role of planning, it is required that planning should have higher quality. This paper seeks to answer some questions as follows: (i) How are changes in paradigm and also the development of planning model for the current transition era?, (ii) What is the best way to improve the quality of planning control on the last generation planning model to realize sustainable city?. Analysis steps that will be used to achieve the paper objectives are: (i) Review of planning and sustainable cities theory, (ii) Pattern recognition, (iii) Identifying control mechanisms and sustainable urban forms, (iv) conceptualization. Based on discussion about sustainable cities and control mechanism, some conclusions can be generated as follows: (i) The third generation planning model is based on the theory of expanded system, emphasizing on the constraint of capacity and the ability of planners within the context of larger environment, (ii) There are various theoretical studies that recommend prescriptive model or solution for sustainable urban form and structure. The concepts of Sustainable Cities can be grouped in Neotraditional Development, Urban Containment, Compact City and The Eco-City. The four models above have criteria, namely (i) high density; (ii) a high level of diversity; (iii) mixed land use; (iv) compactness; (5) sustainable transport; (6) passive solar design; (7) Greening Ecological Design. The three main activities in control mechanisms are: Monitoring and Recommendation; a comparative review of the facts (conditions that exist or are developing) with the purpose (expected conditions, set out in urban planning) and recommendations; Evaluation, a review on the

  10. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    International Nuclear Information System (INIS)

    Kapur, A.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  11. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    Energy Technology Data Exchange (ETDEWEB)

    Kapur, A. [Long Island Jewish Medical Center (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  12. Managing Air Quality - Multi-Pollutant Planning and Control

    Science.gov (United States)

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  13. Application of a B ampersand W developed computer aided pictorial process planning system to CQMS for manufacturing process control

    International Nuclear Information System (INIS)

    Johanson, D.C.; VandeBogart, J.E.

    1992-01-01

    Babcock ampersand Wilcox (B ampersand W) will utilize its internally developed Computer Aided Pictorial Process Planning or CAPPP (pronounced open-quotes cap cubedclose quotes) system to create a paperless manufacturing environment for the Collider Quadruple Magnets (CQM). The CAPPP system consists of networked personal computer hardware and software used to: (1) generate and maintain the documents necessary for product fabrication, (2) communicate the information contained in these documents to the production floor, and (3) obtain quality assurance and manufacturing feedback information from the production floor. The purpose of this paper is to describe the various components of the CAPPP system and explain their applicability to product fabrication, specifically quality assurance functions

  14. A Novel CAPP System Based on SML for Variant Design of Process Planning

    Institute of Scientific and Technical Information of China (English)

    ZHAO Haibin; WANG Junying; ZHANG Min

    2006-01-01

    The production model of "multi-specification and low-quantity" is becoming the main trend of manufacturing industry. As a key activity in the manufacturing chain, traditional computer aided process planning (CAPP) system fails to adapt to the production model of customization. Therefore, a novel method for variant design of process planning was proposed to develop CAPP system based on Tabular Layouts of Article Characteristics (Sach-Merk Leisten in German and SML for short). With the support of standard database of master process planning documents which are developed by parameterization technique, and instance process planning for special product (instance product) can be generated automatically by the sub-system of variant design of process planning. Finally, a CAPP system was developed for process design of rotor of steam turbine to validate the feasibility and applicability of the method.

  15. Does enhancing consciousness for strategic planning processes support the effectiveness of problem-based learning concepts in biomedical education?

    Directory of Open Access Journals (Sweden)

    Arling V.

    2015-09-01

    Full Text Available Interdisciplinary skills gain increasing importance in university and professional contexts. To support these interdisciplinary skills, problem-based learning (PBL is regularly used in a course for biomedical education. In this study, we investigated whether enhancing consciousness for planning processes can support the effectiveness of PBL concepts in an intervention-control group design. Results indicated clear evidence for this: planning skills were associated with better PBL performance. Concluding, self-reflection of planning skills is useful to increase outcome performance of students in PBL courses.

  16. Distinguishing between taskwork and teamwork planning in teams: relations with coordination and interpersonal processes.

    Science.gov (United States)

    Fisher, David M

    2014-05-01

    Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.

  17. Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.

    Science.gov (United States)

    Laguna, Mariola; Purc, Ewelina

    2016-01-01

    The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.

  18. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  19. Defense Resource Management Studies: Introduction to Capability and Acquisition Planning Processes

    Science.gov (United States)

    2010-08-01

    Evaluation Plans ( BEPs ) Establishes how the MoD approved, procurement action will proceed – Dates for requesting and receiving bids – Evaluation period...Proposed Bid and Evaluation Plan ( BEP ) Next chart highlights the intended process and products Flag Button BLOCK 6 8 Intended Process and Products...Funding Level and Source  Circular of Requirements (COR) with Key Performance Parameters (KPPs)  Bid and Evaluation Plan ( BEP ) A B C D E D1 D2 D3

  20. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  1. Session summaries for workshop meeting on virtual reality applications in process industry maintenance training, outage planning, control room retrofits and design, 17th - 18th September 1998

    International Nuclear Information System (INIS)

    Louka, Michael N.

    1998-09-01

    A well-attended workshop was held in Halden 17th - 18th September 1998 to discuss VR applications in the process industry. In particular, maintenance training, outage planning, decommissioning, control room retrofits, and design were discussed. It is clear that there is a great deal of interest in both current and potential use of VR technology. The workshop participants represented a diverse range of research disciplines, as well as utilities, vendors and regulators (author) (ml)

  2. Local Authorities Participation in the Tourism Planning Process

    Directory of Open Access Journals (Sweden)

    Ali SELCUK CAN

    2014-02-01

    Full Text Available The aim of this article is to explore the weaknesses and strengths of local authorities in terms of their participation in the tourism planning process in Turkey. A two-page questionnaire was applied, along with structured interviews with 71 administrators of metropolitan, provincial, and district authorities, between January 1 and September 31, 2011. The findings of the survey suggest that tourism planning responsibilities should be devolved to local authorities. Local authorities do not extensively participate in tourism planning at present because of inadequate budgeting and tourism allocation facilities, insufficient cooperation among stakeholders, and a domination of central administration traditions. Causes of insufficient participation in tourism planning statistically differ among local authorities, in terms of insufficient realizations of the importance of tourism planning by stakeholders, and public land allocation for the purpose of tourism. On the other hand, there is a statistically significant difference between local authorities that have a tourism master plan and those who do not, in terms of a lack of educational opportunities for planners.

  3. Considerations on the Use of Visual Tools in Planning Processes: A Brazilian Experience

    Directory of Open Access Journals (Sweden)

    Camila Zyngier

    2014-05-01

    Full Text Available This paper assumes that citizen participation does not really happen in relation to current urban planning practice for a number of reasons. First of all, many planning processes do not involve citizens as ideally they should. Secondly, although if they involve citizens, many planning processes are not able to communicate them the actual questions to deal with. Thirdly, many citizens have not a sufficient knowledge or ability to understand the planning issues. Therefore, the paper supposes that the use of visual interfaces can collaborate to organize data and improve the involvement of citizens within planning processes. Focusing on the Brazilian reality, the case study present two selected areas with great relevance for the Metropolitan Region of Belo Horizonte’s (MRBH: Santa Lúcia, within the municipality of Belo Horizonte, and the neighborhood Vale do Sereno, in the Nova Lima municipality. The areas result under a great pressure and intensification of anthropic interventions, containing consolidated occupancy. The example on the two areas shows how urban planning still lacks a systematization of data. This also implies that the two municipalities not consider the communication of information as a priority for developing cities. Although current information technology can offer advantages for implementing the planning processes though visual languages, harder efforts are required to build the communication process between people, including communication as part of the planning process.

  4. Instrumentation and Control Life Cycle Management Plan Methodology. Volume 1, Manual: Final report

    International Nuclear Information System (INIS)

    Quick, D.S.; Murray, S.; Florio, F.; Bliss, M.J.

    1995-08-01

    This methodology manual describes how to develop a Life Cycle Management Plan (LCMP). An LCMP is a long-term strategic plan that can be developed for a nuclear power plant to cost-effectively maintain and upgrade its aging or obsolete Instrumentation and Control (I ampersand C) systems. An LCMP defines the utility's mission and objectives in regards to long range I ampersand C planning, as well as the plant's present configuration (I ampersand C systems, networks, man machine interfaces, etc.), its desired future I ampersand C systems, a long term I ampersand C maintenance strategy, and initial upgrade priorities and schedules to cost-effectively implement system upgrades. This manual is accompanied by a workbook (EPRI TR-105555-V2) which contains various worksheets, outlines, and generic interview questions that aid in the LCNW development process

  5. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  6. An expert system for process planning of sheet metal parts produced

    Indian Academy of Sciences (India)

    Process planning of sheet metal part is an important activity in the design of compound die. Traditional methods of carrying out this task are manual, tedious, time-consuming, error-prone and experiencebased. This paper describes the research work involved in the development of an expert system for process planning of ...

  7. 75 FR 32858 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2010-0039; FRL-9158-3] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries Correction In rule document 2010-13377 beginning on...

  8. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to

  9. MANAGING SUSTAINABLE DEVELOPMENT OF MEAT PROCESSING PLANTS AS PART OF THE MECHANISM OF STRATEGIC PLANNING

    Directory of Open Access Journals (Sweden)

    I. S. Gusev

    2015-01-01

    Full Text Available Studies have proven that, at present one of the priority research areas as part of the Development Strategy of the Food Processing Industry of the Russian Federation until 2020 is to develop effective mechanisms for sustainable socio-economic development of industrial enterprises. This article investigated the logic of strategic planning within the framework of sustainable economic growth, analyzed the structure of strategic planning, study the subject of strategic planning in the management of sustainable development of enterprises, justified the basic principles of strategic planning for the effective management of sustainable development of industrial enterprises, as well as the complex of organizational tactical activities of operational management strategy for sustainable development of the enterprise. The observation revealed that currently there was a high need for the framework of the branch, departmental and state programs implemented in industrial management of scientific and methodological approaches of strategic planning. Studies have shown that these approaches in its conceptual entity should be based on the growth potential of the sustainable development of meat processing plants in space and time in order to achieve high competitive advantages. Conducted a systematic analysis of industry conditions proved that the problem of sustainable operation and development of meat processing enterprises as a problem of management and control is relatively new, unexplored and highly relevant. On the contrary, it is the basis of modern management strategy and management is a concept and methodology of the so-called adaptive enterprise development under the action of various external and internal factors, risks that may threaten its economic stability and sustainability.

  10. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Science.gov (United States)

    2010-01-01

    ... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4..., processing, or consumption of Schedule 2 chemicals. (a) Declaration requirements for additionally planned activities. (1) You must declare additionally planned production, processing, or consumption of Schedule 2...

  11. Modern control of mineral wool production process

    Directory of Open Access Journals (Sweden)

    Stankov Stanko P.

    2013-01-01

    variables, data archiving, choice of either automatic or manual control. Supervison of the production process by intuitive screens on monitors, and display terminal is allowed to the operator. Certain objects of plant are represented by the appropriate symbols whose color is changed depending on status (working, inactive status, stand by, failure, etc.. Symbols are associated with characteristic parameters and the variables whose current values are monitored by graphics and/or tables. Special attention is paid to alarm conditions occurring in the case of failure or exceeding the set limits of certain values. Alarm signal is manifested by sound and signal light, with a corresponding text message on the screen, with the date and time of occurrence and the request to the operator to confirm the alarm in some way. Alarms and other important data are stored in the database, including information about the time of removing the causes of the alarm emergence. Beside data acqusition and processing data of process variables and installed equipment state, the system also provides data archiving and generating and printing of daily, weekly and monthly reports. Based on these reports, analysis and appropriate corrections are being done to increase productivity. Specific data of drive functionality, raw materials and amounts of final products are available to management at any moment via Internet. Information about status of embedded equipment, devices and protective elements provide planning periodical reviews and remont some lines or whole plant. Then replacement of certain parts significantly contributes to efficienty of current, preventive and investment maintenance. In this way, reliability and safety of production plant are increased. With complete automatization of production process that is complex and multidisciplinary, demages and energy consumption are considerably decreasing, workforce is optimized, good quality of final product is achieved and plant work with full capacity

  12. Probabilistic safety assessment and optimal control of hazardous technological systems. A marked point process approach

    Energy Technology Data Exchange (ETDEWEB)

    Holmberg, J [VTT Automation, Espoo (Finland)

    1997-04-01

    The thesis models risk management as an optimal control problem for a stochastic process. The approach classes the decisions made by management into three categories according to the control methods of a point process: (1) planned process lifetime, (2) modification of the design, and (3) operational decisions. The approach is used for optimization of plant shutdown criteria and surveillance test strategies of a hypothetical nuclear power plant. 62 refs. The thesis includes also five previous publications by author.

  13. ‘Strategic navigation’ in collaborative innovation planning processes

    DEFF Research Database (Denmark)

    Hansen, Jesper Rohr

    2013-01-01

    Today’s planning dilemmas for the urban fringe in western cities can be perceived of as a struggle between self-organization and control. This is pertinent in times of austerity. Public planning authorities are dependent on cross-sector collaboration in order to enhance the urban development...... leads to the formulation of an analytical model that can be used in future studies of leadership emergence in the urban fringe....... of city areas in the urban fringes, such as brown field and suburbs. Urban planning needs to develop practices of ‘strategic navigation’ (Jean Hillier) in order to come up with new type of responses for this type of dilemma. These practices of navigation emerge in uncertain environments, in which several...

  14. Global Production Planning Process considering the Supply Risk of Overseas Manufacturing Sites

    Directory of Open Access Journals (Sweden)

    Hosang Jung

    2015-01-01

    Full Text Available Although global manufacturers can produce most of their final products in local plants, they need to source components or parts from desirable overseas manufacturing partners at low cost in order to fulfill customer orders. In this global manufacturing environment, capacity information for planning is usually imprecise owing to the various risks of overseas plants (e.g., foreign governments’ policies and labor stability. It is therefore not easy for decision-makers to generate a global production plan showing the production amounts at local plants and overseas manufacturing facilities operated by manufacturing partners. In this paper, we present a new global production planning process considering the supply risk of overseas manufacturing sites. First, local experts estimate the supply capacity of an overseas plant using their judgment to determine when the risk could occur and how large the risk impact would be. Next, we run a global production planning model with the estimated supply capacities. The proposed process systematically adopts the qualitative judgments of local experts in the global production planning process and thus can provide companies with a realistic global production plan. We demonstrate the applicability of the proposed process with a real world case.

  15. US NDC Modernization Iteration E1 Prototyping Report: Processing Control Framework

    Energy Technology Data Exchange (ETDEWEB)

    Prescott, Ryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hamlet, Benjamin R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-12-01

    During the first iteration of the US NDC Modernization Elaboration phase (E1), the SNL US NDC modernization project team developed an initial survey of applicable COTS solutions, and established exploratory prototyping related to the processing control framework in support of system architecture definition. This report summarizes these activities and discusses planned follow-on work.

  16. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  17. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  18. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  19. 324 Facility B-Cell quality process plan

    International Nuclear Information System (INIS)

    Carlson, J.L.

    1998-01-01

    This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone

  20. MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    DiCostanzo, D; Woollard, J; Gupta, N; Ayan, A [Ohio State University, Columbus, OH (United States); Thompson, S [Santa Cruz Radiation Oncology, Santa Cruz, CA (United States)

    2015-06-15

    Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication

  1. MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

    International Nuclear Information System (INIS)

    DiCostanzo, D; Woollard, J; Gupta, N; Ayan, A; Thompson, S

    2015-01-01

    Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication

  2. Management of business process design in global implementation of enterprise resource planning systems

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh

    on process standardization with corporate international management strategy and structural characteristics. Furthermore, business process design can be supported by establishing permanent central governance for BPM and horizontally integrating the BPM function with the IT function at the strategic......Investments in global enterprise resource planning (ERP) systems are typically carried out as a part of the globalization process in multinational corporations (MNCs). Global ERP systems support integration and control in MNCs in an important way by establishing a common language across an MNC...... and findings from case studies in nine organizations, the study addresses the three prescriptive research questions through five descriptive studies. First, by deploying alternative theories, this study explores the strategic, institutional, organizational, and relational factors that influence business...

  3. The use of discrete-event simulation modelling to improve radiation therapy planning processes.

    Science.gov (United States)

    Werker, Greg; Sauré, Antoine; French, John; Shechter, Steven

    2009-07-01

    The planning portion of the radiation therapy treatment process at the British Columbia Cancer Agency is efficient but nevertheless contains room for improvement. The purpose of this study is to show how a discrete-event simulation (DES) model can be used to represent this complex process and to suggest improvements that may reduce the planning time and ultimately reduce overall waiting times. A simulation model of the radiation therapy (RT) planning process was constructed using the Arena simulation software, representing the complexities of the system. Several types of inputs feed into the model; these inputs come from historical data, a staff survey, and interviews with planners. The simulation model was validated against historical data and then used to test various scenarios to identify and quantify potential improvements to the RT planning process. Simulation modelling is an attractive tool for describing complex systems, and can be used to identify improvements to the processes involved. It is possible to use this technique in the area of radiation therapy planning with the intent of reducing process times and subsequent delays for patient treatment. In this particular system, reducing the variability and length of oncologist-related delays contributes most to improving the planning time.

  4. Energy efficient process planning based on numerical simulations

    OpenAIRE

    Neugebauer, Reimund; Hochmuth, C.; Schmidt, G.; Dix, M.

    2011-01-01

    The main goal of energy-efficient manufacturing is to generate products with maximum value-added at minimum energy consumption. To this end, in metal cutting processes, it is necessary to reduce the specific cutting energy while, at the same time, precision requirements have to be ensured. Precision is critical in metal cutting processes because they often constitute the final stages of metalworking chains. This paper presents a method for the planning of energy-efficient machining processes ...

  5. Tank monitor and control system (TMACS) software configuration management plan

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  6. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  7. Emergency preparedness planning: A process to insure effectiveness and efficiency

    International Nuclear Information System (INIS)

    Schroeder, A.J. Jr.

    1994-01-01

    Prevention is undoubtedly the preferred policy regarding emergency response. Unfortunately, despite best intentions, emergencies do occur. It is the prudent operator that has well written and exercised plans in place to respond to the full suite of possible situations. This paper presents a planning process to help personnel develop and/or maintain emergency management capability. It is equally applicable at the field location, the district/regional office, or the corporate headquarters. It is not limited in scope and can be useful for planners addressing incidents ranging from fires, explosions, spills/releases, computer system failure, terrorist threats and natural disasters. By following the steps in the process diagram, the planner will document emergency management capability in a logical and efficient manner which should result in effective emergency response and recovery plans. The astute planner will immediately see that the process presented is a continuing one, fully compatible with the principles of continuous improvement

  8. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  9. Process control analysis of IMRT QA: implications for clinical trials

    International Nuclear Information System (INIS)

    Pawlicki, Todd; Rice, Roger K; Yoo, Sua; Court, Laurence E; McMillan, Sharon K; Russell, J Donald; Pacyniak, John M; Woo, Milton K; Basran, Parminder S; Boyer, Arthur L; Bonilla, Claribel

    2008-01-01

    The purpose of this study is two-fold: first is to investigate the process of IMRT QA using control charts and second is to compare control chart limits to limits calculated using the standard deviation (σ). Head and neck and prostate IMRT QA cases from seven institutions in both academic and community settings are considered. The percent difference between the point dose measurement in phantom and the corresponding result from the treatment planning system (TPS) is used for analysis. The average of the percent difference calculations defines the accuracy of the process and is called the process target. This represents the degree to which the process meets the clinical goal of 0% difference between the measurements and TPS. IMRT QA process ability defines the ability of the process to meet clinical specifications (e.g. 5% difference between the measurement and TPS). The process ability is defined in two ways: (1) the half-width of the control chart limits, and (2) the half-width of ±3σ limits. Process performance is characterized as being in one of four possible states that describes the stability of the process and its ability to meet clinical specifications. For the head and neck cases, the average process target across institutions was 0.3% (range: -1.5% to 2.9%). The average process ability using control chart limits was 7.2% (range: 5.3% to 9.8%) compared to 6.7% (range: 5.3% to 8.2%) using standard deviation limits. For the prostate cases, the average process target across the institutions was 0.2% (range: -1.8% to 1.4%). The average process ability using control chart limits was 4.4% (range: 1.3% to 9.4%) compared to 5.3% (range: 2.3% to 9.8%) using standard deviation limits. Using the standard deviation to characterize IMRT QA process performance resulted in processes being preferentially placed in one of the four states. This is in contrast to using control charts for process characterization where the IMRT QA processes were spread over three of the

  10. Cost account in agriculture with particular accordance to requirements of decision making process and controls

    Directory of Open Access Journals (Sweden)

    Tomasz Kondraszuk

    2009-01-01

    Full Text Available The article presents cost account applicability in the agricultural companies regarding the general theory of economic and organisation of enterprises. The main focus was laid down to analyse the unit total cost account with variable costs and their applicability in three spheres: stock valuation and profit, requirements of planning and decision making processes and controlling. It was concluded that cost calculation at the level of agricultural enterprise should be an inherent element of integrated information system at the level of registry, planning, decision making and control.

  11. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  12. Using Automated Planning for Traffic Signals Control

    Directory of Open Access Journals (Sweden)

    Matija Gulić

    2016-08-01

    Full Text Available Solving traffic congestions represents a high priority issue in many big cities. Traditional traffic control systems are mainly based on pre-programmed, reactive and local techniques. This paper presents an autonomic system that uses automated planning techniques instead. These techniques are easily configurable and modified, and can reason about the future implications of actions that change the default traffic lights behaviour. The proposed implemented system includes some autonomic properties, since it monitors the current traffic state, detects if the system is degrading its performance, sets up new sets of goals to be achieved by the planner, triggers the planner that generates plans with control actions, and executes the selected courses of actions. The obtained results in several artificial and real world data-based simulation scenarios show that the proposed system can efficiently solve traffic congestion.

  13. Plan para control de Malaria en Colombia

    Directory of Open Access Journals (Sweden)

    Hernando Rey

    1943-02-01

    Full Text Available Con motivo de la colaboración de la Oficina de Relaciones Interamericanas en la solución de algunos problemas de Higiene pública en Colombia, el Secretario del Ministerio de Trabajo, Higiene y Previsión Social, doctor Alfonso Orozco, me pidió la elaboración de un breve plan para control de Paludismo en Colombia. El Plan fué presentado al Ministerio por una parte y por otra enviado al doctor Mark F. Boyd de la International Health Division de la Fundación Rockefeller.

  14. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    Kinney, Mike; Breen, Kevin

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  15. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  16. Planning-related motor processes underlie mental practice and imitation learning.

    Science.gov (United States)

    Bach, Patric; Allami, Bassem Khalaf; Tucker, Mike; Ellis, Rob

    2014-06-01

    It is still controversial whether mental practice-the internal rehearsal of movements to improve later performance-relies on processes engaged during physical motor performance and, if so, which processes these are. We report data from 5 experiments, in which participants mentally practiced complex rhythms with either feet or hands while using the same or different body parts to respond to unrelated sounds. We found that responses were impaired for those body parts that were concurrently used in mental practice, suggesting a binding of body-part-specific motor processes to action plans. This result was found when participants mentally trained to memorize the rhythms, to merely improve their performance, when mental practice and execution directly followed one another and when separated by a different task. Finally, it was found irrespective of whether participants practiced on the basis of a symbolic rhythm description and when they practiced by watching somebody perform the rhythms (imitation learning). The effect was eliminated only when the requirement for mental practice was eliminated from the task while keeping visual stimulation identical. These data link mental practice not to execution but planning related motor processes and reveal that these planning processes underlie both mental practice and imitation learning. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  17. A continuous-time control model on production planning network ...

    African Journals Online (AJOL)

    A continuous-time control model on production planning network. DEA Omorogbe, MIU Okunsebor. Abstract. In this paper, we give a slightly detailed review of Graves and Hollywood model on constant inventory tactical planning model for a job shop. The limitations of this model are pointed out and a continuous time ...

  18. Virtual Factory Framework for Supporting Production Planning and Control.

    Science.gov (United States)

    Kibira, Deogratias; Shao, Guodong

    2017-01-01

    Developing optimal production plans for smart manufacturing systems is challenging because shop floor events change dynamically. A virtual factory incorporating engineering tools, simulation, and optimization generates and communicates performance data to guide wise decision making for different control levels. This paper describes such a platform specifically for production planning. We also discuss verification and validation of the constituent models. A case study of a machine shop is used to demonstrate data generation for production planning in a virtual factory.

  19. Environmental control costs for oil shale processes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    The studies reported herein are intended to provide more certainty regarding estimates of the costs of controlling environmental residuals from oil shale technologies being readied for commercial application. The need for this study was evident from earlier work conducted by the Office of Environment for the Department of Energy Oil Shale Commercialization Planning, Environmental Readiness Assessment in mid-1978. At that time there was little reliable information on the costs for controlling residuals and for safe handling of wastes from oil shale processes. The uncertainties in estimating costs of complying with yet-to-be-defined environmental standards and regulations for oil shale facilities are a critical element that will affect the decision on proceeding with shale oil production. Until the regulatory requirements are fully clarified and processes and controls are investigated and tested in units of larger size, it will not be possible to provide definitive answers to the cost question. Thus, the objective of this work was to establish ranges of possible control costs per barrel of shale oil produced, reflecting various regulatory, technical, and financing assumptions. Two separate reports make up the bulk of this document. One report, prepared by the Denver Research Institute, is a relatively rigorous engineering treatment of the subject, based on regulatory assumptions and technical judgements as to best available control technologies and practices. The other report examines the incremental cost effect of more conservative technical and financing alternatives. An overview section is included that synthesizes the products of the separate studies and addresses two variations to the assumptions.

  20. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  1. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  2. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  3. Statistical process control charts for monitoring military injuries.

    Science.gov (United States)

    Schuh, Anna; Canham-Chervak, Michelle; Jones, Bruce H

    2017-12-01

    An essential aspect of an injury prevention process is surveillance, which quantifies and documents injury rates in populations of interest and enables monitoring of injury frequencies, rates and trends. To drive progress towards injury reduction goals, additional tools are needed. Statistical process control charts, a methodology that has not been previously applied to Army injury monitoring, capitalise on existing medical surveillance data to provide information to leadership about injury trends necessary for prevention planning and evaluation. Statistical process control Shewhart u-charts were created for 49 US Army installations using quarterly injury medical encounter rates, 2007-2015, for active duty soldiers obtained from the Defense Medical Surveillance System. Injuries were defined according to established military injury surveillance recommendations. Charts display control limits three standard deviations (SDs) above and below an installation-specific historical average rate determined using 28 data points, 2007-2013. Charts are available in Army strategic management dashboards. From 2007 to 2015, Army injury rates ranged from 1254 to 1494 unique injuries per 1000 person-years. Installation injury rates ranged from 610 to 2312 injuries per 1000 person-years. Control charts identified four installations with injury rates exceeding the upper control limits at least once during 2014-2015, rates at three installations exceeded the lower control limit at least once and 42 installations had rates that fluctuated around the historical mean. Control charts can be used to drive progress towards injury reduction goals by indicating statistically significant increases and decreases in injury rates. Future applications to military subpopulations, other health outcome metrics and chart enhancements are suggested. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  4. 25 CFR 1200.15 - What is the approval process for management plans?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  5. 21 CFR 120.8 - Hazard Analysis and Critical Control Point (HACCP) plan.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Hazard Analysis and Critical Control Point (HACCP... SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS General Provisions § 120.8 Hazard Analysis and Critical Control Point (HACCP) plan. (a) HACCP plan. Each...

  6. Rolling Stock Planning at DSB S-tog - Processes, Cost Structures and Requirements

    DEFF Research Database (Denmark)

    Thorlacius, Per

    A central issue for operators of suburban passenger train transport systems is providing sufficient number of seats for the passengers while at the same time minimising operating costs. The process of providing this is called rolling stock planning. This technical report documents the terminology......, the processes, the cost structures and the requirements for rolling stock planning at DSB S-tog, the suburban passenger train operator of the City of Copenhagen. The focus of the technical report is directed at practical train operator oriented issues. The technical report is thought to serve as a basis...... for investigating better methods to perform the rolling stock planning (to be the topic of later papers). This technical report is produced as a part of the current industrial Ph. D. project to improve the rolling stock planning process of DSB S-tog....

  7. Key Performance Indicators for the Impact of Cognitive Assembly Planning on Ramp-Up Process

    Directory of Open Access Journals (Sweden)

    Christian Buescher

    2012-01-01

    Full Text Available Within the ramp-up phase of highly automated assembly systems, the planning effort forms a large part of production costs. Due to shortening product lifecycles, changing customer demands, and therefore an increasing number of ramp-up processes, these costs even rise. So assembly systems should reduce these efforts and simultaneously be flexible for quick adaption to changes in products and their variants. A cognitive interaction system in the field of assembly planning systems is developed within the Cluster of Excellence “Integrative production technology for high-wage countries” at RWTH Aachen University which integrates several cognitive capabilities according to human cognition. This approach combines the advantages of automation with the flexibility of humans. In this paper the main principles of the system's core component—the cognitive control unit—are presented to underline its advantages with respect to traditional assembly systems. Based on this, the actual innovation of this paper is the development of key performance indicators. These refer to the ramp-up process as a main objective of such a system is to minimize the planning effort during ramp-up. The KPIs are also designed to show the impact on the main idea of the Cluster of Excellence in resolving the so-called Polylemma of Production.

  8. Strategic Planning Process and Organizational Structure: Impacts, Confluence and Similarities

    Directory of Open Access Journals (Sweden)

    Dyogo Felype Neis

    2017-01-01

    Full Text Available This article aims to analyze the relationship between the strategic planning process and organizational structure in the reality of a complex organization: the Public Prosecutor’s Office of Santa Catarina (MPSC. The research is set by the single case study research strategy and data were collected through the following instruments: bibliographical research, documentary research, semi-structured interviews and systematic observation. The conclusion indicates that the phases of the strategic planning process influence and are influenced by the elements of the organizational structure and highlights the confluences, the impacts and similarities between the stages of formulation and implementation of the strategic process with the various constituent elements of the organizational structure.

  9. Plan for the sawtooth control by the ECH in KSTAR

    International Nuclear Information System (INIS)

    Jeong, J.H.; Bae, Y.S.; Joung, M.

    2013-01-01

    The sawtooth control in tokamak is very important because the long period sawtooth is able to trigger TM/NTMs which are significantly reducing the operational performance of plasma and even lead disruptions. The different sawtooth period behaviors by ECH and NBI with different injection conditions are observed in KSTAR during the 2012 campaign. The period of sawtooth is shortened by on-axis X2 110 GHz ECCD in NB-heated plasmas, and the stabilization of the sawtooth is also observed by off-axis X2 110 GHz ECCD. This means that the sawtooth period can be controlled in an accurate way by various EC beam injection conditions in KSTAR and to lengthen it as well. Two new recent sawtooth control methods are of interest and under the plan in KSTAR experiments: sawtooth locking and sawtooth pacing which is a well-known technique to control the sawtooth period behavior by periodic forcing by electron cyclotron waves nearby q=1 surface. The locking range can be investigated with a variable deposition location and the modulated RF power with a certain period and duty cycle in an open-loop control. And then, using the best parameters to lengthen in a controlled-way the sawtooth period, the relations between the sawtooth period and triggering of TM/NTM will be obtained at different beta values. For these experiments, the real-time control development of EC beam power modulation is under plan to control the sawtooth periods to a desired value. This requires the arbitrary power modulation of EC beam synchronized with external waveform generator which can be set the various modulation frequencies. This paper presents the sawtooth characteristics in present KSTAR operation scenario and the plan of the real-time sawtooth control. Also, the upgrade plan of the fast EC power modulation is presented including the present status of KSTAR ECH systems. (author)

  10. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  11. Influence of the demand information quality on planning process accuracy in supply chain. Case studies

    Directory of Open Access Journals (Sweden)

    Natalia Szozda

    2013-06-01

    Full Text Available Background: Identification and analysis of factors that affect the accuracy of demand planning process across the supply chain is one of the most important problems which influence the effectiveness of its material and information flows. Material and methods: On the basis of demand planning process investigation authors define the main elements affecting the right supply chain performance level and investigate the possible connections between demand information quality and demand planning process accuracy. Later, an overview of some recent developments in the analyzed research area is provided. Results: Based on the literature review, there is described the defined factors impact on the accuracy of demand plan in each echelon for case companies. There are considered three cases. The examples illustrate supply chains of different manufacturing companies. The focus is placed on demand planning across the supply chains. The issue of determining the accuracy of future sales plans in each echelon of supply chains and factors affecting it are raised. Taking into account the case companies demand planning process analyses, there are defined possible quality measures, that are possible to be used when forecasting the customer demand. Conclusions: One of the most important and difficult planning area in the companies is becoming planning demand. Errors in planning are reflected not just in the business resource planning but also in the entire supply chain. Presented cases show that many factors affect the proper demand planning process in the supply chain, like e.g.  information technologies, lead-time, or number of supplied materials. As it can be seen from the case studies, the model of collecting information from the market plays an important role in the demand planning process.

  12. Statistical process control: An approach to quality assurance in the production of vitrified nuclear waste

    International Nuclear Information System (INIS)

    Pulsipher, B.A.; Kuhn, W.L.

    1987-01-01

    Current planning for liquid high-level nuclear wastes existing in the United States includes processing in a liquid-fed ceramic melter to incorporate it into a high-quality glass, and placement in a deep geologic repository. The nuclear waste vitrification process requires assurance of a quality product with little or no final inspection. Statistical process control (SPC) is a quantitative approach to one quality assurance aspect of vitrified nuclear waste. This method for monitoring and controlling a process in the presence of uncertainties provides a statistical basis for decisions concerning product quality improvement. Statistical process control is shown to be a feasible and beneficial tool to help the waste glass producers demonstrate that the vitrification process can be controlled sufficiently to produce an acceptable product. This quantitative aspect of quality assurance could be an effective means of establishing confidence in the claims to a quality product

  13. Statistical process control: An approach to quality assurance in the production of vitrified nuclear waste

    International Nuclear Information System (INIS)

    Pulsipher, B.A.; Kuhn, W.L.

    1987-02-01

    Current planning for liquid high-level nuclear wastes existing in the US includes processing in a liquid-fed ceramic melter to incorporate it into a high-quality glass, and placement in a deep geologic repository. The nuclear waste vitrification process requires assurance of a quality product with little or no final inspection. Statistical process control (SPC) is a quantitative approach to one quality assurance aspect of vitrified nuclear waste. This method for monitoring and controlling a process in the presence of uncertainties provides a statistical basis for decisions concerning product quality improvement. Statistical process control is shown to be a feasible and beneficial tool to help the waste glass producers demonstrate that the vitrification process can be controlled sufficiently to produce an acceptable product. This quantitative aspect of quality assurance could be an effective means of establishing confidence in the claims to a quality product. 2 refs., 4 figs

  14. Robot welding process control

    Science.gov (United States)

    Romine, Peter L.

    1991-01-01

    This final report documents the development and installation of software and hardware for Robotic Welding Process Control. Primary emphasis is on serial communications between the CYRO 750 robotic welder, Heurikon minicomputer running Hunter & Ready VRTX, and an IBM PC/AT, for offline programming and control and closed-loop welding control. The requirements for completion of the implementation of the Rocketdyne weld tracking control are discussed. The procedure for downloading programs from the Intergraph, over the network, is discussed. Conclusions are made on the results of this task, and recommendations are made for efficient implementation of communications, weld process control development, and advanced process control procedures using the Heurikon.

  15. Livermore Site Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-21

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

  16. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  17. CHAM: weak signals detection through a new multivariate algorithm for process control

    Science.gov (United States)

    Bergeret, François; Soual, Carole; Le Gratiet, B.

    2016-10-01

    Derivatives technologies based on core CMOS processes are significantly aggressive in term of design rules and process control requirements. Process control plan is a derived from Process Assumption (PA) calculations which result in a design rule based on known process variability capabilities, taking into account enough margin to be safe not only for yield but especially for reliability. Even though process assumptions are calculated with a 4 sigma known process capability margin, efficient and competitive designs are challenging the process especially for derivatives technologies in 40 and 28nm nodes. For wafer fab process control, PA are declined in monovariate (layer1 CD, layer2 CD, layer2 to layer1 overlay, layer3 CD etc….) control charts with appropriated specifications and control limits which all together are securing the silicon. This is so far working fine but such system is not really sensitive to weak signals coming from interactions of multiple key parameters (high layer2 CD combined with high layer3 CD as an example). CHAM is a software using an advanced statistical algorithm specifically designed to detect small signals, especially when there are many parameters to control and when the parameters can interact to create yield issues. In this presentation we will first present the CHAM algorithm, then the case-study on critical dimensions, with the results, and we will conclude on future work. This partnership between Ippon and STM is part of E450LMDAP, European project dedicated to metrology and lithography development for future technology nodes, especially 10nm.

  18. Evidence development and publication planning: strategic process.

    Science.gov (United States)

    Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M

    2009-11-01

    A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.

  19. Helicopter trajectory planning using optimal control theory

    Science.gov (United States)

    Menon, P. K. A.; Cheng, V. H. L.; Kim, E.

    1988-01-01

    A methodology for optimal trajectory planning, useful in the nap-of-the-earth guidance of helicopters, is presented. This approach uses an adjoint-control transformation along with a one-dimensional search scheme for generating the optimal trajectories. In addition to being useful for helicopter nap-of-the-earth guidance, the trajectory planning solution is of interest in several other contexts, such as robotic vehicle guidance and terrain-following guidance for cruise missiles and aircraft. A distinguishing feature of the present research is that the terrain constraint and the threat envelopes are incorporated in the equations of motion. Second-order necessary conditions are examined.

  20. Optimized work control process to improve safety and reliability in a risk-based and deregulated environment

    International Nuclear Information System (INIS)

    Anderson, Jon G.; Jeffries, Jeffrey D. E.; Mairs, Todd P.; Rahn, Frank J.

    1999-01-01

    This paper provides an overview of strategic models to assist power generating plants to improve their work control processes. These models include mechanisms to continually keep the process up to date. Included in the work control process are elements for system cost/performance analysis, life-cycle maintenance planning, on-line scheduling and look-ahead techniques, and schedule implementation to conduct work on the asset. The paper also discusses how risk management associated with work control issues that effect the safety and reliability, as well as O and M costs, is integrated into this strategy. The work control process is a pervasive and critical element in the successful implementation of operations and work management programs. While providing a method to implement maintenance activities in a cost-effective manner, the work control process improves plant safety and system reliability

  1. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  2. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  3. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    International Nuclear Information System (INIS)

    Mutic, S.

    2015-01-01

    defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed

  4. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Mutic, S. [Washington University School of Medicine (United States)

    2015-06-15

    defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed

  5. Implicit and explicit attitudes predict smoking cessation: moderating effects of experienced failure to control smoking and plans to quit.

    Science.gov (United States)

    Chassin, Laurie; Presson, Clark C; Sherman, Steven J; Seo, Dong-Chul; Macy, Jonathan T

    2010-12-01

    The current study tested implicit and explicit attitudes as prospective predictors of smoking cessation in a Midwestern community sample of smokers. Results showed that the effects of attitudes significantly varied with levels of experienced failure to control smoking and plans to quit. Explicit attitudes significantly predicted later cessation among those with low (but not high or average) levels of experienced failure to control smoking. Conversely, however, implicit attitudes significantly predicted later cessation among those with high levels of experienced failure to control smoking, but only if they had a plan to quit. Because smoking cessation involves both controlled and automatic processes, interventions may need to consider attitude change interventions that focus on both implicit and explicit attitudes. (PsycINFO Database Record (c) 2010 APA, all rights reserved).

  6. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment

  7. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  8. How Innovation Theory Can Contribute to the Military Operations Planning Process

    DEFF Research Database (Denmark)

    Heltberg, Anna Therese; Dahl, Kåre

    The research study considers how the application of innovation theory might contribute to military staff work planning processes and bring new perspectives to operational models of analysis such as NATO’s Comprehensive Operations Planning Directive (COPD) and the Danish Field Manual III....

  9. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining.

    Science.gov (United States)

    Salehi, Mojtaba; Bahreininejad, Ardeshir

    2011-08-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.

  10. Opportunities and challenges for process control in process intensification

    NARCIS (Netherlands)

    Nikacevic, N.M.; Huesman, A.E.M.; Hof, Van den P.M.J.; Stankiewicz, A.

    2012-01-01

    This is a review and position article discussing the role and prospective for process control in process intensification. Firstly, the article outlines the classical role of control in process systems, presenting an overview of control systems’ development, from basic PID control to the advanced

  11. An Exploration of Strategic Planning Perspectives and Processes within Community Colleges Identified as Being Distinctive in Their Strategic Planning Practices

    Science.gov (United States)

    Augustyniak, Lisa J.

    2015-01-01

    Community college leaders face unprecedented change, and some have begun reexamining their institutional strategic planning processes. Yet, studies in higher education strategic planning spend little time examining how community colleges formulate their strategic plans. This mixed-method qualitative study used an expert sampling method to identify…

  12. Development of the computer-aided process planning (CAPP system for polymer injection molds manufacturing

    Directory of Open Access Journals (Sweden)

    J. Tepić

    2011-10-01

    Full Text Available Beginning of production and selling of polymer products largely depends on mold manufacturing. The costs of mold manufacturing have significant share in the final price of a product. The best way to improve and rationalize polymer injection molds production process is by doing mold design automation and manufacturing process planning automation. This paper reviews development of a dedicated process planning system for manufacturing of the mold for injection molding, which integrates computer-aided design (CAD, computer-aided process planning (CAPP and computer-aided manufacturing (CAM technologies.

  13. Control of the technological processes at ''Azovstal'' plant using radioisotope devices

    Energy Technology Data Exchange (ETDEWEB)

    Nosochenko, O V; Overchenko, Z V; Karpov, O I; Deryabina, G N

    1980-05-01

    Considered is the state of radioisotope control of the technological process at 'Azovstal' plant which has permitted to increase the quality of metal and of metal production. With the help of radioisotope densimeter PR-1024 carried out is the control of the density of the lime solution used for hearth spraying at pig iron casting. A system of automatic correction of skip coke supply according to indications of moisture gauges ''Neutron 3-1'' is implemented at blast furnaces. A radioisotope thickness gauge of hot rolling is positioned on the section of finishing stand of thick-sheet plant, its operation is based on the ..gamma.. radiation weakening in dependence on sheet thickness. The introduction of thickness gauges in the automatized system of rolling control is planned. A radioisotope device ''Paza 2'' for measuring of continuous ingot skin thickness is tested successively at the plant. Gamma-relay devices are used to control the level of loose materials in bunkers. Noted is the prospects of using radioisotopic means of control and automatization of technological processes in ferrous matallurgy.

  14. Process control using modern systems of information processing

    International Nuclear Information System (INIS)

    Baldeweg, F.

    1984-01-01

    Modern digital automation techniques allow the application of demanding types of process control. These types of process control are characterized by their belonging to higher levels in a multilevel model. Functional and technical aspects of the performance of digital automation plants are presented and explained. A modern automation system is described considering special procedures of process control (e.g. real time diagnosis)

  15. The impact of curricula and lesson planning in the teaching process

    OpenAIRE

    Majlinda Lika

    2017-01-01

    Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide i...

  16. Optimization-based decision support systems for planning problems in processing industries

    NARCIS (Netherlands)

    Claassen, G.D.H.

    2014-01-01

    Summary

    Optimization-based decision support systems for planning problems in processing industries

    Nowadays, efficient planning of material flows within and between supply chains is of vital importance and has become one of the most challenging problems for decision support in

  17. Tank monitor and control system (TMACS) software configuration management plan; TOPICAL

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  18. Process control program development

    International Nuclear Information System (INIS)

    Dameron, H.J.

    1985-01-01

    This paper details the development and implementation of a ''Process Control Program'' at Duke Power's three nuclear stations - Oconee, McGuire, and Catawba. Each station is required by Technical Specification to have a ''Process Control Program'' (PCP) to control all dewatering and/or solidification activities for radioactive wastes

  19. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  20. [Design of a Hazard Analysis and Critical Control Points (HACCP) plan to assure the safety of a bologna product produced by a meat processing plant].

    Science.gov (United States)

    Bou Rached, Lizet; Ascanio, Norelis; Hernández, Pilar

    2004-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a systematic integral program used to identify and estimate the hazards (microbiological, chemical and physical) and the risks generated during the primary production, processing, storage, distribution, expense and consumption of foods. To establish a program of HACCP has advantages, being some of them: to emphasize more in the prevention than in the detection, to diminish the costs, to minimize the risk of manufacturing faulty products, to allow bigger trust to the management, to strengthen the national and international competitiveness, among others. The present work is a proposal based on the design of an HACCP program to guarantee the safety of the Bologna Special Type elaborated by a meat products industry, through the determination of hazards (microbiological, chemical or physical), the identification of critical control points (CCP), the establishment of critical limits, plan corrective actions and the establishment of documentation and verification procedures. The used methodology was based in the application of the seven basic principles settled down by the Codex Alimentarius, obtaining the design of this program. In view of the fact that recently the meat products are linked with pathogens like E. coli O157:H7 and Listeria monocytogenes, these were contemplated as microbiological hazard for the establishment of the HACCP plan whose application will guarantee the obtaining of a safe product.

  1. Chemical process control using Mat lab

    International Nuclear Information System (INIS)

    Kang, Sin Chun; Kim, Raeh Yeon; Kim, Yang Su; Oh, Min; Yeo, Yeong Gu; Jung, Yeon Su

    2001-07-01

    This book is about chemical process control, which includes the basis of process control with conception, function, composition of system and summary, change of laplace and linearization, modeling of chemical process, transfer function and block diagram, the first dynamic property of process, the second dynamic property of process, the dynamic property of combined process, control structure of feedback on component of control system, the dynamic property of feedback control loop, stability of closed loop control structure, expression of process, modification and composition of controller, analysis of vibration response and adjustment controller using vibration response.

  2. Incorporating organ movements in IMRT treatment planning for prostate cancer: Minimizing uncertainties in the inverse planning process

    International Nuclear Information System (INIS)

    Unkelbach, Jan; Oelfke, Uwe

    2005-01-01

    We investigate an off-line strategy to incorporate inter fraction organ movements in IMRT treatment planning. Nowadays, imaging modalities located in the treatment room allow for several CT scans of a patient during the course of treatment. These multiple CT scans can be used to estimate a probability distribution of possible patient geometries. This probability distribution can subsequently be used to calculate the expectation value of the delivered dose distribution. In order to incorporate organ movements into the treatment planning process, it was suggested that inverse planning could be based on that probability distribution of patient geometries instead of a single snapshot. However, it was shown that a straightforward optimization of the expectation value of the dose may be insufficient since the expected dose distribution is related to several uncertainties: first, this probability distribution has to be estimated from only a few images. And second, the distribution is only sparsely sampled over the treatment course due to a finite number of fractions. In order to obtain a robust treatment plan these uncertainties should be considered and minimized in the inverse planning process. In the current paper, we calculate a 3D variance distribution in addition to the expectation value of the dose distribution which are simultaniously optimized. The variance is used as a surrogate to quantify the associated risks of a treatment plan. The feasibility of this approach is demonstrated for clinical data of prostate patients. Different scenarios of dose expectation values and corresponding variances are discussed

  3. Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements

    Science.gov (United States)

    McKinley, David

    2008-01-01

    The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.

  4. DUAL-PROCESS, a highly reliable process control system

    International Nuclear Information System (INIS)

    Buerger, L.; Gossanyi, A.; Parkanyi, T.; Szabo, G.; Vegh, E.

    1983-02-01

    A multiprocessor process control system is described. During its development the reliability was the most important aspect because it is used in the computerized control of a 5 MW research reactor. DUAL-PROCESS is fully compatible with the earlier single processor control system PROCESS-24K. The paper deals in detail with the communication, synchronization, error detection and error recovery problems of the operating system. (author)

  5. Implementation of Logic Flow in Planning and Production Control

    Directory of Open Access Journals (Sweden)

    Ulewicz Robert

    2016-03-01

    Full Text Available The article presents the results of analysis, the use of continuous flow of logic at the stage of production planning and control of the company producing furniture. The concept of continuous flow tends to regulate the flow of materials in a manner that provides the shortest flow path without unnecessary activities (Muda is a Japanese word meaning waste, a constant takt and defined throughput at constant resource requirements for the so-called transfer of material through the whole process. In the study Glenday’d sieve method was used to identify the correct area, which requires the value stream mapping, and areas called excessive complexity, which do not provide added value. The use of Glenday’s sieve method made it possible to identify areas in which it must be improve production capacity.

  6. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    Energy Technology Data Exchange (ETDEWEB)

    Soria-Lara, Julio A., E-mail: j.a.sorialara@uva.nl; Bertolini, Luca, E-mail: l.bertolini@uva.nl; Brömmelstroet, Marco te, E-mail: M.C.G.teBrommelstroet@uva.nl

    2015-01-15

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

  7. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    International Nuclear Information System (INIS)

    Soria-Lara, Julio A.; Bertolini, Luca; Brömmelstroet, Marco te

    2015-01-01

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes

  8. Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406

    Science.gov (United States)

    Casas, Joan R.; Matos, Jose Campos e.

    2017-09-01

    In Europe, as all over the world, the need to manage roadway bridges in an efficient way led to the development of different management systems. Hence, nowadays, many European countries have their own system. Although they present a similar architectural framework, several differences can be appointed. These differences constitute a divergent mechanism that may conduct to different decisions on maintenance actions. Within the roadway bridge management process, the identification of maintenance needs is more effective when developed in a uniform and repeatable manner. This process can be accomplished by the identification of performance indicators and definition of performance goals and key performance indicators (KPI), improving the planning of maintenance strategies. Therefore, a discussion at a European level, seeking to achieve a standardized approach in this subject, will bring significant benefits. Accordingly, a COST Action is under way in Europe with the aim of standardizing the establishment of quality control plans for roadway bridges.

  9. Guide for the elaboration of plans to control emergencies

    International Nuclear Information System (INIS)

    1990-01-01

    This Venezuelan standard establishes the lines for the elaboration of plans to control emergencies. It includes general aspects for the control of any emergency originated by operational flaws, for the nature or for acts of third, in any industrial installation, working center, public or private building [es

  10. Process control for sheet-metal stamping process modeling, controller design and shop-floor implementation

    CERN Document Server

    Lim, Yongseob; Ulsoy, A Galip

    2014-01-01

    Process Control for Sheet-Metal Stamping presents a comprehensive and structured approach to the design and implementation of controllers for the sheet metal stamping process. The use of process control for sheet-metal stamping greatly reduces defects in deep-drawn parts and can also yield large material savings from reduced scrap. Sheet-metal forming is a complex process and most often characterized by partial differential equations that are numerically solved using finite-element techniques. In this book, twenty years of academic research are reviewed and the resulting technology transitioned to the industrial environment. The sheet-metal stamping process is modeled in a manner suitable for multiple-input multiple-output control system design, with commercially available sensors and actuators. These models are then used to design adaptive controllers and real-time controller implementation is discussed. Finally, experimental results from actual shopfloor deployment are presented along with ideas for further...

  11. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  12. Application of the user-centred design process according ISO 9241-210 in air traffic control.

    Science.gov (United States)

    König, Christina; Hofmann, Thomas; Bruder, Ralph

    2012-01-01

    Designing a usable human machine interface for air traffic control is challenging and should follow approved methods. The ISO 9241-210 standard promises high usability of products by integrating future users and following an iterative process. This contribution describes the proceeding and first results of the analysis and application of ISO 9241-210 to develop a planning tool for air traffic controllers.

  13. Verification and Planning for Stochastic Processes with Asynchronous Events

    National Research Council Canada - National Science Library

    Younes, Hakan L

    2005-01-01

    .... The most common assumption is that of history-independence: the Markov assumption. In this thesis, the author considers the problems of verification and planning for stochastic processes with asynchronous events, without relying on the Markov assumption...

  14. Control System Development Plan for the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Neumeyer, C.; Mueller, D.; Gates, D.A.; Ferron, J.R.

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has as one of its primary goals the demonstration of the attractiveness of the spherical torus concept as a fusion power plant. Central to this goal is the achievement of high plasma β ( = 2 micro 0 /B 2 a measure of the efficiency of a magnetic plasma confinement system). It has been demonstrated both theoretically and experimentally that the maximum achievable β is a strong function of both local and global plasma parameters. It is therefore important to optimize control of the plasma. To this end a phased development plan for digital plasma control on NSTX is presented. The relative level of sophistication of the control system software and hardware will be increased according to the demands of the experimental program in a three phase plan. During Day 0 (first plasma), a simple coil current control algorithm will initiate plasma operations. During the second phase (Day 1) of plasma operations the control system will continue to use the preprogrammed algorithm to initiate plasma breakdown but will then change over to a rudimentary plasma control scheme based on linear combinations of measured plasma fields and fluxes. The third phase of NSTX plasma control system development will utilize the rtEFIT code, first used on DIII-D, to determine, in real-time, the full plasma equilibrium by inverting the Grad-Shafranov equation. The details of the development plan, including a description of the proposed hardware will be presented

  15. Planning Framework for Mesolevel Optimization of Urban Runoff Control Schemes

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Qianqian; Blohm, Andrew; Liu, Bo

    2017-04-01

    A planning framework is developed to optimize runoff control schemes at scales relevant for regional planning at an early stage. The framework employs less sophisticated modeling approaches to allow a practical application in developing regions with limited data sources and computing capability. The methodology contains three interrelated modules: (1)the geographic information system (GIS)-based hydrological module, which aims at assessing local hydrological constraints and potential for runoff control according to regional land-use descriptions; (2)the grading module, which is built upon the method of fuzzy comprehensive evaluation. It is used to establish a priority ranking system to assist the allocation of runoff control targets at the subdivision level; and (3)the genetic algorithm-based optimization module, which is included to derive Pareto-based optimal solutions for mesolevel allocation with multiple competing objectives. The optimization approach describes the trade-off between different allocation plans and simultaneously ensures that all allocation schemes satisfy the minimum requirement on runoff control. Our results highlight the importance of considering the mesolevel allocation strategy in addition to measures at macrolevels and microlevels in urban runoff management. (C) 2016 American Society of Civil Engineers.

  16. Automatic Generation of Object Models for Process Planning and Control Purposes using an International standard for Information Exchange

    Directory of Open Access Journals (Sweden)

    Petter Falkman

    2003-10-01

    Full Text Available In this paper a formal mapping between static information models and dynamic models is presented. The static information models are given according to an international standard for product, process and resource information exchange, (ISO 10303-214. The dynamic models are described as Discrete Event Systems. The product, process and resource information is automatically converted into product routes and used for simulation, controller synthesis and verification. A high level language, combining Petri nets and process algebra, is presented and used for speci- fication of desired routes. A main implication of the presented method is that it enables the reuse of process information when creating dynamic models for process control. This method also enables simulation and verification to be conducted early in the development chain.

  17. 300 Area Process Trenches Postclosure Plan

    International Nuclear Information System (INIS)

    Badden, J.W.

    1998-05-01

    The 300 Area Process Trenches (300 APT) certified closure under a modified closure option and in compliance with Condition II.K.3 oft he Hartford Facility Dangerous Waste Permit (Penit) (Ecology 1994). Modified closure has been determined to be the appropriate closure option for this unit due to groundwater that remains contaminated from past operations at the 300 APT. Corrective actions required for dangerous waste constituents remaining in groundwater will occur pursuant to the 300 APT Resource Conservation and Recovery Act (RCRA) Final Status Facility Ground Water Monitoring Plan, the Hanford Site Wide Dangerous Waste Permit, and in conjunction with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions at the 300-FF-5 Groundwater Operable Unit (OU) pursuant to the Record of Decision (ROD) (EPA 1996). This postclosure plan identifies the modified closure actions required at the unit under postclosure care. It contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit (condition II.K.3)

  18. Computer aided process planning at the Oak Ridge Y-12 plant: a pilot project

    International Nuclear Information System (INIS)

    Hewgley, R.E. Jr.; Prewett, H.P. Jr.

    1979-01-01

    In 1976, a formal needs analysis was conducted in one of the Fabrication Division Shops of all activities from the receipt of an order through final machining. The results indicated deficiencies in process planning activities involving special production work. A pilot program was organized to investigate the benefits of emerging CAM technology and application of GT concepts for machining operations at the Y-12 Plant. The objective of the CAPP Project was to provide computer-assisted process planning for special production machining in th shop. The CAPP team was charged with the specific goal of demonstrating computer-aided process planning within a four-year term. The CAPP charter included a plan with intermediate measurable milestones for achieving its mission. In three years, the CAPP project demonstrated benefits to process planning. A capability to retrieve historical records for similar parts, to review accurately the status of all staff assignments, and to generate detailed machining procedures definitely can impact the way in which a machine shop prepared for new orders. The real payoff is in the hardcopy output (N/C programs, studies, sequence plans, and procedures). 4 figures,

  19. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  20. Process management practice

    International Nuclear Information System (INIS)

    Pyeon, In Beom

    1983-04-01

    This book gives descriptions of qualifying subject and test scope like production plan and control, economic feasibility, process management, quality management and operations research, industrial economics like materials and marketing management, production management such as meaning and goals of process management and production plan and control, basic economic concept, official interest and equivalence, and depreciation, and OR concept such as network analysis and PERT CPM and stimulation.

  1. Analysis of Participatory Processes in the Formulation of Spatial Plan for Nature Park Medvednica

    Directory of Open Access Journals (Sweden)

    Nataša Lovrić

    2011-12-01

    Full Text Available Background and Purpose: This research aims to assess the stakeholders influence on spatial planning of Nature Park Medvednica, a mountainous protected area adjacent to Zagreb, the capital city of Croatia, which tries to hold on to the pressure of the urbanization. Because of the inexistence of spatial plan which is required with the Croatian laws, its area was significantly decreased in 2009. This kind of research has not been done yet for NP Medvednica, and it will provide a contribution to the process of developing a spatial Plan for NP Medvednica. Material and Methods: The study was conducted in the framework of stakeholder analysis, for which a series of in-depth interviews with - stakeholders were performed, and documents concerning the spatial plan were analysed. The data gained was processed in MAXQDA software for qualitative analysis. Results and Conclusion: The gathered data explains which are the disadvantages of the tree processes of the formulation of the spatial plan and is giving a possible theoretical explanation or a model which can be implied in any decision making process involving stakeholders in natural resources management in within a given political and cultural context. Description of the past and current spatial planning situation of the NP Medvednica was specified and issues and stakeholders concerning the creation of the spatial plan where identified. The key conflict areas that affect the formulation of spatial plan were detected and examined. The level of participation of stakeholders in the context of fulfilment of their own interests was assessed as well as the influence on participation processes of different stakeholder groups on the formulation of the spatial plan. In order to have proper citizens and stakeholders participation some changes in the legislation should take place.

  2. Pedestrians' intention to jaywalk: Automatic or planned? A study based on a dual-process model in China.

    Science.gov (United States)

    Xu, Yaoshan; Li, Yongjuan; Zhang, Feng

    2013-01-01

    The present study investigates the determining factors of Chinese pedestrians' intention to violate traffic laws using a dual-process model. This model divides the cognitive processes of intention formation into controlled analytical processes and automatic associative processes. Specifically, the process explained by the augmented theory of planned behavior (TPB) is controlled, whereas the process based on past behavior is automatic. The results of a survey conducted on 323 adult pedestrian respondents showed that the two added TPB variables had different effects on the intention to violate, i.e., personal norms were significantly related to traffic violation intention, whereas descriptive norms were non-significant predictors. Past behavior significantly but uniquely predicted the intention to violate: the results of the relative weight analysis indicated that the largest percentage of variance in pedestrians' intention to violate was explained by past behavior (42%). According to the dual-process model, therefore, pedestrians' intention formation relies more on habit than on cognitive TPB components and social norms. The implications of these findings for the development of intervention programs are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. 30 CFR 71.301 - Respirable dust control plan; approval by District Manager and posting.

    Science.gov (United States)

    2010-07-01

    ... District Manager and posting. 71.301 Section 71.301 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... plan; approval by District Manager and posting. (a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager...

  4. Healthcare Strategic Planning as Part of National and Regional Development in the Israeli Galilee: A Case Study of the Planning Process.

    Science.gov (United States)

    Peled, Ronit; Schenirer, Jerry

    2009-10-01

    This article describes a systematic process of geographic and strategic planning for healthcare services as a part of a regional development plan in the Israeli Galilee. The planning process consisted of three stages: (a) assessment of needs, demand and existing resources; (b) prioritisation of initiatives; and (c) scheduling of theoretical priorities. For many years the region has suffered from inequities and inequalities regarding the availability and accessibility of a regional healthcare system, resulting in high mortality and morbidity rates and low quality of life. The aim of the healthcare strategic plan was to suggest initiatives and actions to be taken in order to improve healthcare provision and the health and wellbeing of local residents.

  5. Plan before You Play: An Activity for Teaching the Managerial Process

    Science.gov (United States)

    Althouse, Norm R.; Hedges, Peggy L.

    2015-01-01

    This article describes a 60-minute classroom activity using LEGO® bricks that demonstrates and reinforces the importance of the managerial process. The activity, Plan Before You Play (PBP), is targeted to introductory business classes, and differs from others in that it requires little investment or up-front planning, is easily scalable, and, with…

  6. How to Analyze Routines in Teachers' Thinking Processes during Lesson Planning.

    Science.gov (United States)

    Bromme, Rainer

    A justification for the study of teachers' routines, as they affect the preparation of lesson plans, prefaces this paper on teachers' thought processes during lesson planning. In focusing on the importance of research into teachers' routines, it is pointed out that lesson preparation and classroom routines permit teachers to direct attention to…

  7. An Extended Genetic Algorithm for Distributed Integration of Fuzzy Process Planning and Scheduling

    Directory of Open Access Journals (Sweden)

    Shuai Zhang

    2016-01-01

    Full Text Available The distributed integration of process planning and scheduling (DIPPS aims to simultaneously arrange the two most important manufacturing stages, process planning and scheduling, in a distributed manufacturing environment. Meanwhile, considering its advantage corresponding to actual situation, the triangle fuzzy number (TFN is adopted in DIPPS to represent the machine processing and transportation time. In order to solve this problem and obtain the optimal or near-optimal solution, an extended genetic algorithm (EGA with innovative three-class encoding method, improved crossover, and mutation strategies is proposed. Furthermore, a local enhancement strategy featuring machine replacement and order exchange is also added to strengthen the local search capability on the basic process of genetic algorithm. Through the verification of experiment, EGA achieves satisfactory results all in a very short period of time and demonstrates its powerful performance in dealing with the distributed integration of fuzzy process planning and scheduling (DIFPPS.

  8. Parental supervision for their children's toothbrushing: Mediating effects of planning, self-efficacy, and action control.

    Science.gov (United States)

    Hamilton, Kyra; Cornish, Stephen; Kirkpatrick, Aaron; Kroon, Jeroen; Schwarzer, Ralf

    2018-05-01

    With 60-90% of children worldwide reportedly experiencing dental caries, poor oral health in the younger years is a major public health issue. As parents are important to children's oral hygiene practices, we examined the key self-regulatory behaviours of parents for supervising their children's toothbrushing using the health action process approach. Participants (N = 281, 197 mothers) comprised Australian parents of 2- to 5-year-olds. A longitudinal design was used to investigate the sequential mediation chain for the effect of intention (Time 1) on parental supervision for their youngest child's toothbrushing (Time 3), via self-efficacy and planning (Time 2), and action control (Time 3). A latent-variable structural equation model, controlling for baseline behaviour and habit, revealed significant indirect effects from intention via self-efficacy and action control and intention via planning and action control, on parental supervision behaviour. The model was a good fit to the data, explaining 74% of the variance in parents' supervising behaviour for their children's toothbrushing. While national recommendations are provided to guide parents in promoting good oral hygiene practices with their children, current results show the importance of going beyond simple knowledge transmission to support parents' intentions to supervise their children's toothbrushing actually materialize. Current findings make a significant contribution to the cumulative empirical evidence regarding self-regulatory components in health behaviour change and can inform intervention development to increase parents' participation in childhood oral hygiene practices, thus helping to curb rising oral health conditions and diseases. Statement of contribution What is already known on this subject? Self-regulatory skills are important to translate intentions into behaviour. Self-efficacy, planning, and action control are key self-regulatory skills for behaviour change. What does this study add

  9. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  10. Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan

    Science.gov (United States)

    1977-01-01

    The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...

  11. The spill prevention, control, and countermeasures (SPCC) plan for the Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    This spill prevention, control and countermeasures (SPCC) Plan is divided into two volumes. Volume I addresses Y-12's compliance with regulations pertinent to the content of SPCC Plans. Volume II is the SPCC Hazardous Material Storage Data Base, a detailed tabulation of facility-specific information and data on potential spill sources at the Y-12 Plant. Volume I follows the basic format and subject sequence specified in 40 CFR 112.7. This sequence is prefaced by three additional chapters, including this introduction and brief discussions of the Y-12 Plant's background/environmental setting and potential spill source categories. Two additional chapters on containers and container storage areas and PCB and PCB storage for disposal facilities are inserted into the required sequence. The following required subjects are covered in this volume: Spill history, site drainage; secondary containment/diversion structures and equipment; contingency plans; notification and spill response procedures; facility drainage; bulk storage tanks; facility transfer operations, pumping, and in-plant processes; transfer stations (facility tank cars/tank tracks); inspections and records; security, and personnel, training, and spill prevention procedures

  12. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  13. Controls on the Environmental Fate of Compounds Controlled by Coupled Hydrologic and Reactive Processes

    Science.gov (United States)

    Hixson, J.; Ward, A. S.; McConville, M.; Remucal, C.

    2017-12-01

    Current understanding of how compounds interact with hydrologic processes or reactive processes have been well established. However, the environmental fate for compounds that interact with hydrologic AND reactive processes is not well known, yet critical in evaluating environmental risk. Evaluations of risk are often simplified to homogenize processes in space and time and to assess processes independently of one another. However, we know spatial heterogeneity and time-variable reactivities complicate predictions of environmental transport and fate, and is further complicated by the interaction of these processes, limiting our ability to accurately predict risk. Compounds that interact with both systems, such as photolytic compounds, require that both components are fully understood in order to predict transport and fate. Release of photolytic compounds occurs through both unintentional releases and intentional loadings. Evaluating risks associated with unintentional releases and implementing best management practices for intentional releases requires an in-depth understanding of the sensitivity of photolytic compounds to external controls. Lampricides, such as 3-trifluoromethyl-4-nitrophenol (TFM), are broadly applied in the Great Lakes system to control the population of invasive sea lamprey. Over-dosing can yield fish kills and other detrimental impacts. Still, planning accounts for time of passage and dilution, but not the interaction of the physical and chemical systems (i.e., storage in the hyporheic zone and time-variable decay rates). In this study, we model a series of TFM applications to test the efficacy of dosing as a function of system characteristics. Overall, our results demonstrate the complexity associated with photo-sensitive compounds through stream-hyporheic systems, and highlight the need to better understand how physical and chemical systems interact to control transport and fate in the environment.

  14. nestor Guideline for Preservation Planning – a Process Model

    Directory of Open Access Journals (Sweden)

    Sabine Schrimpf

    2014-02-01

    Full Text Available The nestor guideline for preservation planning is the latest in a series of nestor publications. nestor is the German competence network for digital preservation and it offers all interested parties from the private and public domains the possibility to participate in working groups. The guideline for preservation planning is the result of such a working group, which discussed the conceptual and practical issues of implementing the OAIS Functional Entity “Preservation Planning”.The guideline describes a process model and offers some guidance on potential implementations. It integrates and builds on recognized community concepts like Significant Properties, the OAIS Designated Community, the National Archives of Australia’s Performance Model, the PREMIS concept of Intellectual Entities and Representations, and the PLANET’s approach to preservation planning. Furthermore, it introduces the concepts “intended use” (Nutzungsziele, “information type” (Informationstyp and “preservation group” (Erhaltungsgruppe. The purpose of these new categories is that information objects shall be grouped by information type (e.g., audio, video, text… and intended use (e.g., reading for pleasure, search for specific information… to preservation groups for automatic processing. Significant properties can then be derived for whole preservation groups. The file format alone is considered as not completely sufficient for such categorisation. Some exemplary implementation solutions of the new concepts are presented in an annex.The guideline takes into account that resources for preservation planning and preservation actions are limited and has therefore adopted 4 premises: adequacy, financial viability, automation, and authenticity of archived objects. Its pragmatic approach becomes apparent in the definition and explanation of these dimensions. The guideline is written from the point of view of representatives of memory institutions, i

  15. Use of focus groups in a library's strategic planning process.

    Science.gov (United States)

    Higa-Moore, Mori Lou; Bunnett, Brian; Mayo, Helen G; Olney, Cynthia A

    2002-01-01

    The use of focus groups to determine patron satisfaction with library resources and services is extensive and well established. This article demonstrates how focus groups can also be used to help shape the future direction of a library as part of the strategic planning process. By responding to questions about their long-term library and information needs, focus group participants at the University of Texas Southwestern Medical Center at Dallas Library contributed an abundance of qualitative patron data that was previously lacking from this process. The selection and recruitment of these patrons is discussed along with the line of questioning used in the various focus group sessions. Of special interest is the way the authors utilized these sessions to mobilize and involve the staff in creating the library's strategic plan. This was accomplished not only by having staff members participate in one of the sessions but also by sharing the project's major findings with them and instructing them in how these findings related to the library's future. The authors' experience demonstrates that focus groups are an effective strategic planning tool for libraries and emphasizes the need to share information broadly, if active involvement of the staff is desired in both the development and implementation of the library's strategic plan.

  16. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  17. A methodology integrating Petri nets and knowledge-based systems to support process family planning

    NARCIS (Netherlands)

    Zhang, Linda L.; Xu, Qianli; Helo, Petri

    2012-01-01

    Planning production processes for product families have been well recognised as an effective means of achieving successful product family development. However, most existing approaches do not lend themselves to planning production processes with focus on the optimality of the cohort of a product

  18. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated

  19. City Labs as Vehicles for Innovation in Urban Planning Processes

    Directory of Open Access Journals (Sweden)

    Christian Scholl

    2016-12-01

    Full Text Available This paper assesses the role of urban experiments for local planning processes through a case-based analysis of the city lab of Maastricht. In conjunction with this, the article offers three contributions, as additional elements. Firstly, the paper develops a set of defining characteristics of city labs as an analytical concept which is relevant for discussions about (collaborative planning. Secondly, it refines the literature on collaborative planning by drawing attention to experimentation and innovation. Thirdly, the paper assesses the potential of city labs to contribute to the innovation of urban governance. The work draws from the literature on experimentation and learning as well as the literature on collaborative urban planning. In the conclusions, we discuss the potential of city labs as vehicles for learning about new urban planning approaches and their limitations as spaces for small-scale experimentation. The paper is based on research for the URB@Exp research project funded by JPI Urban Europe.

  20. Individualized Quality Control Plan (IQCP): Is It Value-Added for Clinical Microbiology?

    OpenAIRE

    Sharp, Susan E.; Miller, Melissa B.; Hindler, Janet

    2015-01-01

    The Center for Medicaid and Medicare Services (CMS) recently published their Individualized Quality Control Plan (IQCP [https://www.cms.gov/regulations-and-guidance/legislation/CLIA/Individualized_Quality_Control_Plan_IQCP.html]), which will be the only option for quality control (QC) starting in January 2016 if laboratories choose not to perform Clinical Laboratory Improvement Act (CLIA) [U.S. Statutes at Large 81(1967):533] default QC. Laboratories will no longer be able to use “equivalent ...

  1. [Mechanized system for planning technological processes].

    Science.gov (United States)

    Pashchenko, V S; Shapiro, A M

    1977-01-01

    A mechanized system for the production processes planning involving the use of an electronic code device for data preparation on a punched tape of the "EPECT-IT" type, at the base of which there are classifiers of standard operations and transitions to individual design members, is considered. A fragment of the classifier and a skeleton diagram of the system are presented. It is pointed out that the use of the system helps improve the quality of the design work, as well as to yield considerable economic advantages. The system is in operation at some enterprises of the medical engineering industry.

  2. Command and Control Planning and Teamwork: Exploring the Future

    National Research Council Canada - National Science Library

    Sterling, Bruce S; Lickteig, Carl W

    2000-01-01

    .... This paper examines how participant ratings of command and control planning and observer assessments of teamwork were related in a series of futuristic missions conducted by the Mounted Maneuver...

  3. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  4. Diverse Planning for UAV Control and Remote Sensing

    Directory of Open Access Journals (Sweden)

    Jan Tožička

    2016-12-01

    Full Text Available Unmanned aerial vehicles (UAVs are suited to various remote sensing missions, such as measuring air quality. The conventional method of UAV control is by human operators. Such an approach is limited by the ability of cooperation among the operators controlling larger fleets of UAVs in a shared area. The remedy for this is to increase autonomy of the UAVs in planning their trajectories by considering other UAVs and their plans. To provide such improvement in autonomy, we need better algorithms for generating alternative trajectory variants that the UAV coordination algorithms can utilize. In this article, we define a novel family of multi-UAV sensing problems, solving task allocation of huge number of tasks (tens of thousands to a group of configurable UAVs with non-zero weight of equipped sensors (comprising the air quality measurement as well together with two base-line solvers. To solve the problem efficiently, we use an algorithm for diverse trajectory generation and integrate it with a solver for the multi-UAV coordination problem. Finally, we experimentally evaluate the multi-UAV sensing problem solver. The evaluation is done on synthetic and real-world-inspired benchmarks in a multi-UAV simulator. Results show that diverse planning is a valuable method for remote sensing applications containing multiple UAVs.

  5. Commercial Aircraft Trajectory Planning based on Multiphase Mixed-Integer Optimal Control

    OpenAIRE

    Soler Arnedo, Manuel Fernando

    2017-01-01

    The main goal of this dissertation is to develop optimal control techniques for aircraft trajectory planning looking at reduction of fuel consumption, emissions and overfly charges in flight plans. The calculation of a flight plan involves the consideration of multiple factors. They can be classified as either continuous or discrete, and include nonlinear aircraft performance, atmospheric conditions, wind conditions, airspace structure, amount of departure fuel, and operational...

  6. Legal and planning framework for the control of noise emissions

    International Nuclear Information System (INIS)

    Trinick, M.

    1992-01-01

    An examination is offered of the statutory basis for the control of noise emissions. Principal pieces of legislation and some advisory notes have been produced within appendices. The paper briefly examines the controls in other EC countries before discussing the way in which planning controls relate to the jurisdiction of the court. (author)

  7. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  8. Process for integrating surface drainage constraints on mine planning

    Energy Technology Data Exchange (ETDEWEB)

    Sawatsky, L.F; Ade, F.L.; McDonald, D.M.; Pullman, B.J. [Golder Associates Ltd., Calgary, AB (Canada)

    2009-07-01

    Surface drainage for mine closures must be considered during all phases of mine planning and design in order to minimize environmental impacts and reduce costs. This paper discussed methods of integrating mine drainage criteria and associated mine planning constraints into the mine planning process. Drainage constraints included stream diversions; fish compensation channels; collection receptacles for the re-use of process water; separation of closed circuit water from fresh water; and the provision of storage ponds. The geomorphic approach replicated the ability of natural channels to respond to local and regional changes in hydrology as well as channel disturbances from extreme flood events, sedimentation, debris, ice jams, and beaver activity. The approach was designed to enable a sustainable system and provide conveyance capacity for extreme floods without spillage to adjacent watersheds. Channel dimensions, bank and bed materials, sediment loads, bed material supplies and the hydrologic conditions of the analogue stream were considered. Hydrologic analyses were conducted to determine design flood flow. Channel routes, valley slopes, sinuosity, width, and depth were established. It was concluded that by incorporating the geomorphic technique, mine operators and designers can construct self-sustaining drainage systems that require little or no maintenance in the long-term. 7 refs.

  9. Optimal control of stretching process of flexible solar arrays on spacecraft based on a hybrid optimization strategy

    Directory of Open Access Journals (Sweden)

    Qijia Yao

    2017-07-01

    Full Text Available The optimal control of multibody spacecraft during the stretching process of solar arrays is investigated, and a hybrid optimization strategy based on Gauss pseudospectral method (GPM and direct shooting method (DSM is presented. First, the elastic deformation of flexible solar arrays was described approximately by the assumed mode method, and a dynamic model was established by the second Lagrangian equation. Then, the nonholonomic motion planning problem is transformed into a nonlinear programming problem by using GPM. By giving fewer LG points, initial values of the state variables and control variables were obtained. A serial optimization framework was adopted to obtain the approximate optimal solution from a feasible solution. Finally, the control variables were discretized at LG points, and the precise optimal control inputs were obtained by DSM. The optimal trajectory of the system can be obtained through numerical integration. Through numerical simulation, the stretching process of solar arrays is stable with no detours, and the control inputs match the various constraints of actual conditions. The results indicate that the method is effective with good robustness. Keywords: Motion planning, Multibody spacecraft, Optimal control, Gauss pseudospectral method, Direct shooting method

  10. The impact of participation in strategic planning and action planning on management control effectiveness: An analysis of independent and joint effects

    OpenAIRE

    Bedford, David S.; Bednark, Piotr; Dossi, Andrea; Ditillo, Angelo; Gosselin, Maurice; Madsen, Dag Øivind

    2016-01-01

    This research paper examines the independent and joint effects of participation in strategic planning and action planning. There is extensive research about employee participation in both the fields of strategic planning and budgeting. However, there is a lack of research about the interaction between participation in strategic planning and budgeting. Drawing on the research on participation in decision-making processes, the hypothesis is that strategic planning and action plan...

  11. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  12. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  13. Interaction of attentional and motor control processes in handwriting.

    Science.gov (United States)

    Brown, T L; Donnenwirth, E E

    1990-01-01

    The interaction between attentional capacity, motor control processes, and strategic adaptations to changing task demands was investigated in handwriting, a continuous (rather than discrete) skilled performance. Twenty-four subjects completed 12 two-minute handwriting samples under instructions stressing speeded handwriting, normal handwriting, or highly legible handwriting. For half of the writing samples, a concurrent auditory monitoring task was imposed. Subjects copied either familiar (English) or unfamiliar (Latin) passages. Writing speed, legibility ratings, errors in writing and in the secondary auditory task, and a derived measure of the average number of characters held in short-term memory during each sample ("planning unit size") were the dependent variables. The results indicated that the ability to adapt to instructions stressing speed or legibility was substantially constrained by the concurrent listening task and by text familiarity. Interactions between instructions, task concurrence, and text familiarity in the legibility ratings, combined with further analyses of planning unit size, indicated that information throughput from temporary storage mechanisms to motor processes mediated the loss of flexibility effect. Overall, the results suggest that strategic adaptations of a skilled performance to changing task circumstances are sensitive to concurrent attentional demands and that departures from "normal" or "modal" performance require attention.

  14. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  15. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    International Nuclear Information System (INIS)

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  16. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  17. Two-Step System Identification and Primitive-Based Motion Planning for Control of Small Unmanned Aerial Vehicles

    Science.gov (United States)

    Grymin, David J.

    This dissertation addresses motion planning, modeling, and feedback control for autonomous vehicle systems. A hierarchical approach for motion planning and control of nonlinear systems operating in obstacle environments is presented. To reduce computation time during the motion planning process, dynamically feasible trajectories are generated in real-time through concatenation of pre-specified motion primitives. The motion planning task is posed as a search over a directed graph, and the applicability of informed graph search techniques is investigated. Specifically, a locally greedy algorithm with effective backtracking ability is developed and compared to weighted A* search. The greedy algorithm shows an advantage with respect to solution cost and computation time when larger motion primitive libraries that do not operate on a regular state lattice are utilized. Linearization of the nonlinear system equations about the motion primitive library results in a hybrid linear time-varying model, and an optimal control algorithm using the l 2-induced norm as the performance measure is applied to ensure that the system tracks the desired trajectory. The ability of the resulting controller to closely track the trajectory obtained from the motion planner, despite various disturbances and uncertainties, is demonstrated through simulation. Additionally, an approach for obtaining dynamically feasible reference trajectories and feedback controllers for a small unmanned aerial vehicle (UAV) based on an aerodynamic model derived from flight tests is presented. The modeling approach utilizes the two step method (TSM) with stepwise multiple regression to determine relevant explanatory terms for the aerodynamic models. Dynamically feasible trajectories are then obtained through the solution of an optimal control problem using pseudospectral optimal control software. Discretetime feedback controllers are then obtained to regulate the vehicle along the desired reference trajectory

  18. The Official Control beyond the Official Control. How To Plan And Schedule Controls Starting From Risk Assessment Along The Agro-Food Supply Chain.

    Science.gov (United States)

    Panunzio, M F; Caporizzi, R; Lagravinese, D; Conversano, M

    2015-01-01

    Every year the Italian Ministry of Health, on the basis of regional data, draws up the "Report on Official Controls" to be submitted to the Parliament. The report contains abundant data, diagrams and charts and illustrates the number and type of official controls (OC) performed by the pertinent Bodies (Ministry of Health, Regional and Local Health Authorities) over the previous year on Food Business Operators (FBO), in accordance with the EC Regulation 882/2004. The trend - which has consolidated over the years - relates to the multiplicity of OC and shows a decrease of such controls compared to an increase in "non-conformities". OC frequency is established by the Regional Authorities on the basis of the categorisation of both a "generic risk" for companies calculated taking into account the probability of occurrence of a "non-conformity", and a "specific" risk, assessed on the basis of the results of the OC actually performed on a given "Operatore del Settore Alimentare" (Food Sector Operator, in Italian: OSA). Thus, categorisation (i.e. the probability of occurrence of non-conformities) is the main driver of the OC scheduling and planning process. We have been asking ourselves whether the current OC planning/scheduling method is still suitable for ensuring food safety in the face of internalisation of the food supply chain. As a matter of fact, food safety is now becoming increasingly variable due to the globalization of consumption where "farm to fork", rather than "border to fork", food safety must be ensured. On the basis of these considerations, a different OC planning /scheduling method is being proposed based on the assessment of risks and the estimation of the occurrence of the same along the agro-food chain.

  19. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  20. Automation in Siemens fuel manufacturing - the basis for quality improvement by statistical process control (SPC)

    International Nuclear Information System (INIS)

    Drecker, St.; Hoff, A.; Dietrich, M.; Guldner, R.

    1999-01-01

    Statistical Process Control (SPC) is one of the systematic tools to perform a valuable contribution to the control and planning activities for manufacturing processes and product quality. Advanced Nuclear Fuels GmbH (ANF) started a program to introduce SPC in all sections of the manufacturing process of fuel assemblies. The concept phase is based on a realization of SPC in 3 pilot projects. The existing manufacturing devices are reviewed for the utilization of SPC. Subsequent modifications were made to provide the necessary interfaces. The processes 'powder/pellet manufacturing'. 'cladding tube manufacturing' and 'laser-welding of spacers' are located at the different locations of ANF. Due to the completion of the first steps and the experience obtained by the pilot projects, the introduction program for SPC has already been extended to other manufacturing processes. (authors)

  1. Computationally based methodology for reengineering the high-level waste planning process at SRS

    International Nuclear Information System (INIS)

    Paul, P.K.; Gregory, M.V.; Wells, M.N.

    1997-01-01

    The Savannah River Site (SRS) has started processing its legacy of 34 million gallons of high-level radioactive waste into its final disposable form. The SRS high-level waste (HLW) complex consists of 51 waste storage tanks, 3 evaporators, 6 waste treatment operations, and 2 waste disposal facilities. It is estimated that processing wastes to clean up all tanks will take 30+ yr of operation. Integrating all the highly interactive facility operations through the entire life cycle in an optimal fashion-while meeting all the budgetary, regulatory, and operational constraints and priorities-is a complex and challenging planning task. The waste complex operating plan for the entire time span is periodically published as an SRS report. A computationally based integrated methodology has been developed that has streamlined the planning process while showing how to run the operations at economically and operationally optimal conditions. The integrated computational model replaced a host of disconnected spreadsheet calculations and the analysts' trial-and-error solutions using various scenario choices. This paper presents the important features of the integrated computational methodology and highlights the parameters that are core components of the planning process

  2. Assessing the structure of non-routine decision processes in Airline Operations Control.

    Science.gov (United States)

    Richters, Floor; Schraagen, Jan Maarten; Heerkens, Hans

    2016-03-01

    Unfamiliar severe disruptions challenge Airline Operations Control professionals most, as their expertise is stretched to its limits. This study has elicited the structure of Airline Operations Control professionals' decision process during unfamiliar disruptions by mapping three macrocognitive activities on the decision ladder: sensemaking, option evaluation and action planning. The relationship between this structure and decision quality was measured. A simulated task was staged, based on which think-aloud protocols were obtained. Results show that the general decision process structure resembles the structure of experts working under routine conditions, in terms of the general structure of the macrocognitive activities, and the rule-based approach used to identify options and actions. Surprisingly, high quality of decision outcomes was found to relate to the use of rule-based strategies. This implies that successful professionals are capable of dealing with unfamiliar problems by reframing them into familiar ones, rather than to engage in knowledge-based processing. Practitioner Summary: We examined the macrocognitive structure of Airline Operations Control professionals' decision process during a simulated unfamiliar disruption in relation to decision quality. Results suggest that successful professionals are capable of dealing with unfamiliar problems by reframing them into familiar ones, rather than to engage in knowledge-based processing.

  3. Windows Calorimeter Control (WinCal) program computer software test plan

    International Nuclear Information System (INIS)

    Pertzborn, N.F.

    1997-01-01

    This document provides the information and guidelines necessary to conduct all the required testing of the Windows Calorimeter Control (WinCal) system. The strategy and essential components for testing the WinCal System Project are described in this test plan. The purpose of this test plan is to provide the customer and performing organizations with specific procedures for testing the specified system's functions

  4. Influence of inhibitory control on planning abilities in children with mild intellectual disability

    Directory of Open Access Journals (Sweden)

    Gligorović Milica

    2016-01-01

    Full Text Available With regard to the fact that the tendency toward unsophisticated strategies is often related to difficulties with basic components of executive functions, the aim of this research was to determine the relation between planning abilities and inhibitory control in children with mild intellectual disability (MID. The sample included 56 children with idiopathic MID (IQ 50-69, M=61.13, SD=7.14, of both genders (26/46.3% of girls, between 9.11 and 14.03 years of age (M=11.61; SD=1.29. Go no Go Task and Day/Night Stroop Task were used for the assessment of inhibitory control (delayed response to the agreed signal, conflict provoking motor responses, and inhibition of arrogant verbal responses, while Tower of London Test (ToL was used for the assessment of planning abilities. Multivariate analysis of covariance (MANCOVA, paired samples t-test, Pearson's correlation, and partial correlation coefficients were used in statistical analysis of the results. The results showed that the mistakes in Response delay set of Go-no-Go task were the only significant factor of primary Total move score variable (ToL. The influence of the ability to delay motor activity, assessed by Response delay set, on all ToL variables was statistically significant (p=0.003. The results lead to a conclusion that, during the processes of planning and executing activities, children with MID primarily rely on simple inhibitory mechanisms.

  5. 78 FR 5165 - First Phase of the Forest Planning Process for the Bio-Region

    Science.gov (United States)

    2013-01-24

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio... initiating the first phase of the forest planning process for the Bio-Region. SUMMARY: Come gather 'round... phase of the Bio-Regional Assessment has begun. DATES: The Bio-Regional Assessment Report will be...

  6. Statewide and Metropolitan Transportation Planning Processes : a TPCB Peer Exchange

    Science.gov (United States)

    2016-04-20

    This report highlights key recommendations and noteworthy practices identified at Statewide and Metropolitan Transportation Planning Processes Peer Exchange held on September 9-10, 2015 in Shepherdstown, West Virginia. This event was sponsored ...

  7. Integrated maintenance planning in manufacturing systems

    CERN Document Server

    Al-Turki, Umar M; Yilbas, Bekir Sami; Sahin, Ahmet Ziyaettin

    2014-01-01

    This book introduces the concept of integrated planning for maintenance and production taken into account quality and safety for high global socio-economic impact. It provides insight into the planning process at a global level starting from the business level and ending with the operational level where the plan is implemented and controlled.

  8. A Randomized Controlled Trial of an Eczema Care Plan.

    Science.gov (United States)

    Rea, Corinna J; Tran, Katherine D; Jorina, Maria; Wenren, Larissa M; Hawryluk, Elena B; Toomey, Sara L

    2018-03-02

    To test whether an eczema care plan (ECP) would improve provider documentation and management, decrease eczema severity, and increase patient quality of life (QOL) in the pediatric primary care setting. We conducted a randomized controlled trial from June 2015 to September 2016 at a large hospital-based pediatric primary care clinic. Participants included children from 1 month to 16 years of age with a diagnosis of eczema. The intervention group received the ECP and the control group received usual care. Both groups completed a validated eczema severity scale (Patient-Oriented Eczema Measure [POEM]) and a QOL scale (Infant's Dermatitis Quality of Life Index [IDQOL]) or Children's Dermatology Life Quality Index [CDLQI]) before the visit and again ~1 month later. A total of 211 caregivers completed both the pre- and postintervention surveys (100 control group and 111 intervention group [94% completion]). Intervention group providers were more likely to recommend a comprehensive "step-up" plan (88%) vs 28%; P plan to families (80%) vs 2%; P improved between the pre- and postintervention periods. However, there was not a significant difference between the groups on either measure: POEM difference -0.8, 95% confidence interval (CI) -3.2 to 1.7; IDQOL difference -0.1, 95% CI -1.8 to 1.6; CDLQI difference 0.8, 95% CI -0.9 to 2.6. Intervention group providers documented more comprehensive eczema care than control group providers. Although patients improved on all measures in the postintervention period, the ECP did not augment that improvement. Copyright © 2018 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  9. Well-directed inclusion of hematology in African national cancer control plans.

    Science.gov (United States)

    Weaver, Meaghann; Yao, Atteby J J; Renner, Lorna; Harif, Mhamed; Lam, Catherine G

    2017-07-01

    In the context of a convergent call for noncommunicable disease integration in the global agenda, recognizing cross-cutting needs and opportunities in national strategies across disease fields with shared priorities in low- and middle-income settings can enhance sustainable development approaches. We reviewed publicly available cancer control plans in Africa to evaluate for inclusion of hematology needs and shared service priorities. Pediatric data remain sparse in cancer control plans. While continental Africa represents incredible diversity, recognizing shared priorities and opportunity for collaboration between oncology and hematology services and across age groups may guide prioritized cancer control efforts and reduce programmatic redundancies in resource-limited settings. © 2017 Wiley Periodicals, Inc.

  10. Enterprise resource planning for hospitals

    NARCIS (Netherlands)

    van Merode, Godefridus G.; Groothuis, Siebren; Hasman, Arie

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  11. Enterprise resource planning for hospitals

    NARCIS (Netherlands)

    Merode, van G.G.; Groothuis, S.; Hasman, A.

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients’ processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  12. Analysis and planning of dose-finding studies with active control

    International Nuclear Information System (INIS)

    Helms, Hans-Joachim

    2014-01-01

    In the clinical development of radiopharmaceuticals the dose finding plays an important role. The contribution is focused on the evaluation and planning of dose finding studies with active control. It is of primary interest to find the lowest dose that yields the same efficacy as the active control. Besides the target dose confidence intervals are of importance to describe the quality of the target dose estimation. The calculation of case numbers and the determination of the dose steps to be studied are challenging under practical conditions. The contribution covers the demonstration of the statistical model the parameter estimation and the asymptotic properties based on maximum likelihood theory, the spline-based evaluation of nonlinear dose finding studies with active control and the planning of design and number of cases.

  13. Livermore Site Spill Prevention, Control, and Countermeasures Plan, May 2017

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-05-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil.

  14. Decision making and planning of children in the reproductive process of males

    Directory of Open Access Journals (Sweden)

    Alejandra Salguero

    2009-10-01

    Full Text Available Reproduction is not restricted to the biological; it is also a complex and dynamic social process. The objective of this paper is to analyze the decision and planning of children as part of the reproductive process in men. Methodologically, a qualitative research was made. The analysis includes in-depth interviews with 30 parents between 20 and 45 years, of medium socio-economic level in México. The results show that the reproductive process incorporates family formation negotiated with their couple the marriage until they had economic potential. In some cases, their decision hastened because the couple was pregnant. The planning was not contemplated but when getting the news, they accept it and get involved in the process, while others see it as a conflict.

  15. Software quality assurance plan for the National Ignition Facility integrated computer control system

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project`s controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy`s (DOE`s) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project.

  16. Software quality assurance plan for the National Ignition Facility integrated computer control system

    International Nuclear Information System (INIS)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project's controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy's (DOE's) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project

  17. Modeling Social Influence via Combined Centralized and Distributed Planning Control

    Science.gov (United States)

    Vaccaro, James; Guest, Clark

    2010-01-01

    Real world events are driven by a mixture of both centralized and distributed control of individual agents based on their situational context and internal make up. For example, some people have partial allegiances to multiple, contradictory authorities, as well as to their own goals and principles. This can create a cognitive dissonance that can be exploited by an appropriately directed psychological influence operation (PSYOP). An Autonomous Dynamic Planning and Execution (ADP&E) approach is proposed for modeling both the unperturbed context as well as its reaction to various PSYOP interventions. As an illustrative example, the unrest surrounding the Iranian elections in the summer of 2009 is described in terms applicable to an ADP&E modeling approach. Aspects of the ADP&E modeling process are discussed to illustrate its application and advantages for this example.

  18. EVALUATING OF FOREST HARVESTING AND ROAD PLANS ON PROCESS OF DECISION IN FORESTRY

    Directory of Open Access Journals (Sweden)

    H. Hulusi Acar

    2001-04-01

    Full Text Available The plans of the forest harvesting and road are main subject of well arranged forest practices. This plans can answer the questions; When?, How?, Why?, Where are to be made the forest operations. Forest practices are three phase as a strategic, tactical and operational plans. Forest harvesting and road plans should be decided to carry out main purpose by evaluate according to technical changing on every steps of decisions process.

  19. Process control in biogas plants

    DEFF Research Database (Denmark)

    Holm-Nielsen, Jens Bo; Oleskowicz-Popiel, Piotr

    2013-01-01

    Efficient monitoring and control of anaerobic digestion (AD) processes are necessary in order to enhance biogas plant performance. The aim of monitoring and controlling the biological processes is to stabilise and optimise the production of biogas. The principles of process analytical technology...

  20. Reconstruction of a whole-body counter into a process computer-controlled low-level whole-body scanner

    International Nuclear Information System (INIS)

    Hamann, C.

    1975-01-01

    A report is given on the state of the research project to reconstruct our whole-body counter with solid geometries into a scanning type one. The object is to develop a process computer controlled 'adaptive system'. The self-built scan mechanics are explained and the advantages and problems of applying stepping motors are gone into. A stepping motor coordinates control is presented. As the planned scanner and the process computer form a digital controlled system, all theoretical and actual values as well as the control orders from the process computer must be directly controllable. A CAMAC system was not used for economical reasons, the process periphery was made controllable by self building of interfaces to and from the computer. As example, the available multi-channel analyzers were converted to external controlling. The price-moderate and relatively simple self-built set-up are outlined and an example is given of how a TELETYPE version is reconstructed into a fast electronic interface. A BUS-MULTIPLEX system was developed which generates all necessary DI/DO interfaces out of one DI and DO address of the process computer only. The essential part of this system is given. (orig./LH) [de

  1. University Strategic Planning: A Process for Change in a Principal Preparation Program

    Science.gov (United States)

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  2. Demonstration tools for the facility/land use planning process at Rocky Flats

    International Nuclear Information System (INIS)

    Ryan, K.B.

    1994-01-01

    The new mission for the Rocky Flats Site states, open-quotes Manage waste and materials, clean up and convert the Rocky Flats Site to beneficial use in a manner that is safe, environmentally and socially responsible, physical secure, and cost-effective.close quotes. In addition, community recognition and support is encouraged and expected. To accomplish this ambitious mission of converting to another use and incorporating stakeholder input, many tools must be developed. These tools must be clearly understandable and readily available, with the hope and plan that similar outcomes will be much more apparent if the same or similar tools are applied by all decision markers, both internal and external. Since the task is monumental and extremely complex, establishing and understanding these available tools early in the planning process is important. All decision makers must be identified and the availability of the tools should be shared to eliminate redundancy and expedite the planning process. Most documents utilized for decision making are very technical in nature. Since numerous and varied stakeholders will be involved, these documents must be socialized or open-quotes detechnicalized.close quotes This paper discusses developing internal and universally acceptable demonstration tools for explaining how facilities and land will be analyzed for constraints and opportunities during the planning process

  3. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  4. 30 CFR 780.15 - Air pollution control plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Air pollution control plan. 780.15 Section 780.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT...

  5. 30 CFR 784.26 - Air pollution control plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Air pollution control plan. 784.26 Section 784.26 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATION...

  6. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  7. Critical path method as the criterion for optimization of business planning process

    OpenAIRE

    Butsenko Elena V.

    2016-01-01

    In today's economy the task of improving business planning is considered a necessary component of any enterprise management process and is precisely the solution drawn from that task which determines the financial policy and economic structure. The development of technologies based on the optimization of business planning is a very urgent scientific challenge. In this paper we propose to use the methods of network planning and management as a tool for economic and mathematical modeling to...

  8. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  9. [GIS and scenario analysis aid to water pollution control planning of river basin].

    Science.gov (United States)

    Wang, Shao-ping; Cheng, Sheng-tong; Jia, Hai-feng; Ou, Zhi-dan; Tan, Bin

    2004-07-01

    The forward and backward algorithms for watershed water pollution control planning were summarized in this paper as well as their advantages and shortages. The spatial databases of water environmental function region, pollution sources, monitoring sections and sewer outlets were built with ARCGIS8.1 as the platform in the case study of Ganjiang valley, Jiangxi province. Based on the principles of the forward algorithm, four scenarios were designed for the watershed pollution control. Under these scenarios, ten sets of planning schemes were generated to implement cascade pollution source control. The investment costs of sewage treatment for these schemes were estimated by means of a series of cost-effective functions; with pollution source prediction, the water quality was modeled with CSTR model for each planning scheme. The modeled results of different planning schemes were visualized through GIS to aid decision-making. With the results of investment cost and water quality attainment as decision-making accords and based on the analysis of the economic endurable capacity for water pollution control in Ganjiang river basin, two optimized schemes were proposed. The research shows that GIS technology and scenario analysis can provide a good guidance to the synthesis, integrity and sustainability aspects for river basin water quality planning.

  10. Automated synthesis of image processing procedures using AI planning techniques

    Science.gov (United States)

    Chien, Steve; Mortensen, Helen

    1994-01-01

    This paper describes the Multimission VICAR (Video Image Communication and Retrieval) Planner (MVP) (Chien 1994) system, which uses artificial intelligence planning techniques (Iwasaki & Friedland, 1985, Pemberthy & Weld, 1992, Stefik, 1981) to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing subprograms) in response to image processing requests made to the JPL Multimission Image Processing Laboratory (MIPL). The MVP system allows the user to specify the image processing requirements in terms of the various types of correction required. Given this information, MVP derives unspecified required processing steps and determines appropriate image processing programs and parameters to achieve the specified image processing goals. This information is output as an executable image processing program which can then be executed to fill the processing request.

  11. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  12. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  13. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.

    2000-05-15

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  14. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.

    2000-11-30

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  15. Microcrystalline silicon deposition: Process stability and process control

    International Nuclear Information System (INIS)

    Donker, M.N. van den; Kilper, T.; Grunsky, D.; Rech, B.; Houben, L.; Kessels, W.M.M.; Sanden, M.C.M. van de

    2007-01-01

    Applying in situ process diagnostics, we identified several process drifts occurring in the parallel plate plasma deposition of microcrystalline silicon (μc-Si:H). These process drifts are powder formation (visible from diminishing dc-bias and changing spatial emission profile on a time scale of 10 0 s), transient SiH 4 depletion (visible from a decreasing SiH emission intensity on a time scale of 10 2 s), plasma heating (visible from an increasing substrate temperature on a time scale of 10 3 s) and a still puzzling long-term drift (visible from a decreasing SiH emission intensity on a time scale of 10 4 s). The effect of these drifts on the crystalline volume fraction in the deposited films is investigated by selected area electron diffraction and depth-profiled Raman spectroscopy. An example shows how the transient depletion and long-term drift can be prevented by suitable process control. Solar cells deposited using this process control show enhanced performance. Options for process control of plasma heating and powder formation are discussed

  16. Strategic Planning Process Exercise: A Semester-Long Experiential Approach to Engage Students

    Science.gov (United States)

    Singh, Jitendra

    2018-01-01

    Strategic planning provides a sense of direction and can have a significant impact on the future of an organization. Students wanting to serve in leadership positions need to demonstrate a firm understanding of the concepts necessary to work on this complex process. Careful planning also ensures students' survival in a competitive business…

  17. A tool for aligning event logs and prescriptive process models through automated planning

    OpenAIRE

    De Leoni, M.; Lanciano, G.; Marrella, A.

    2017-01-01

    In Conformance Checking, alignment is the problem of detecting and repairing nonconformity between the actual execution of a business process, as recorded in an event log, and the model of the same process. Literature proposes solutions for the alignment problem that are implementations of planning algorithms built ad-hoc for the specific problem. Unfortunately, in the era of big data, these ad-hoc implementations do not scale sufficiently compared with wellestablished planning systems. In th...

  18. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  19. An integrated approach to process control

    NARCIS (Netherlands)

    Schippers, W.A.J.

    2001-01-01

    The control of production processes is the subject of several disciplines, such as statistical process control (SPC), total productive maintenance (TPM), and automated process control (APC). Although these disciplines are traditionally separated (both in science and in business practice), their

  20. IMRT plan verification in radiotherapy

    International Nuclear Information System (INIS)

    Vlk, P.

    2006-01-01

    This article describes the procedure for verification of IMRT (Intensity modulated radiation therapy) plan, which is used in the Oncological Institute of St. Elisabeth in Bratislava. It contains basic description of IMRT technology and developing a deployment plan for IMRT planning system CORVUS 6.0, the device Mimic (Multilammelar intensity modulated collimator) and the overall process of verifying the schedule created. The aim of verification is particularly good control of the functions of MIMIC and evaluate the overall reliability of IMRT planning. (author)

  1. Improving energy audit process and report outcomes through planning initiatives

    Science.gov (United States)

    Sprau Coulter, Tabitha L.

    Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first

  2. Superintendents' Perceptions of the School Improvement Planning Process in the Southeastern USA

    Science.gov (United States)

    Dunaway, David M.; Bird, James J.; Wang, Chuang; Hancock, Dawson

    2014-01-01

    The purpose of this study of school improvement planning in the southeastern USA was to establish the current view of the process through the eyes of the district superintendents. The answers to the questions were consistently mixed. Generally, the presence of school improvement planning is prevalent in the large majority of districts. However,…

  3. Perceptions of the Purpose and Value of the School Improvement Plan Process

    Science.gov (United States)

    Dunaway, David M.; Kim, Do-Hong; Szad, Elizabeth R.

    2012-01-01

    The purpose of this research was to determine how teachers and administrators in a successful North Carolina district perceived the purpose and value of a school improvement plan (SIP) and the planning process. The SIP is the accepted best practice for school-wide improvement, and the perceptions of the purpose and value of the process…

  4. Statistical process control in wine industry using control cards

    OpenAIRE

    Dimitrieva, Evica; Atanasova-Pacemska, Tatjana; Pacemska, Sanja

    2013-01-01

    This paper is based on the research of the technological process of automatic filling of bottles of wine in winery in Stip, Republic of Macedonia. The statistical process control using statistical control card is created. The results and recommendations for improving the process are discussed.

  5. 78 FR 8104 - First Phase of the Forest Planning Process for the Bio-Region; Correction

    Science.gov (United States)

    2013-02-05

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio-Region; Correction AGENCY: USDA, Forest Service. ACTION: Notice; correction. SUMMARY: The Department of... rule entitled First Phase of the Forest Planning Process for the Bio-Region. The document contained...

  6. The effects of crisis plans for patients with psychotic and bipolar disorders: a randomised controlled trial

    Directory of Open Access Journals (Sweden)

    Roosenschoon BJ

    2009-07-01

    , insight into illness, recovery style, social support, locus of control, service engagement and coping with crises situations. The interviews take place before randomisation, nine month later and finally eighteen months after randomisation. Discussion This study examines the effects of two types of crisis plans. In addition, the results offer an understanding of the way these advance statements work and whether it is more effective to include a patients' advocate in the process of creating a psychiatric advance statement. These statements may be an intervention to prevent crises and the use of compulsion in mental health care. The strength and limitations of this study are discussed. Trial registration Current Controlled Trails NTR1166.

  7. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N. J.

    2008-01-01

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project

  8. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  9. Process planning optimization on turning machine tool using a hybrid genetic algorithm with local search approach

    Directory of Open Access Journals (Sweden)

    Yuliang Su

    2015-04-01

    Full Text Available A turning machine tool is a kind of new type of machine tool that is equipped with more than one spindle and turret. The distinctive simultaneous and parallel processing abilities of turning machine tool increase the complexity of process planning. The operations would not only be sequenced and satisfy precedence constraints, but also should be scheduled with multiple objectives such as minimizing machining cost, maximizing utilization of turning machine tool, and so on. To solve this problem, a hybrid genetic algorithm was proposed to generate optimal process plans based on a mixed 0-1 integer programming model. An operation precedence graph is used to represent precedence constraints and help generate a feasible initial population of hybrid genetic algorithm. Encoding strategy based on data structure was developed to represent process plans digitally in order to form the solution space. In addition, a local search approach for optimizing the assignments of available turrets would be added to incorporate scheduling with process planning. A real-world case is used to prove that the proposed approach could avoid infeasible solutions and effectively generate a global optimal process plan.

  10. Structuring warehouse management : Exploring the fit between warehouse characteristics and warehouse planning and control structure, and its effect on warehouse performance

    NARCIS (Netherlands)

    N. Faber (Nynke)

    2015-01-01

    markdownabstractThis dissertation studies the management processes that plan, control, and optimize warehouse operations. The inventory in warehouses decouples supply from demand. As such, economies of scale can be achieved in production, purchasing, and transport. As warehouses become more and more

  11. Target costing as an element of the hard coal extraction cost planning process

    Directory of Open Access Journals (Sweden)

    Katarzyna Segeth-Boniecka

    2017-09-01

    Full Text Available Target costing as an element of the hard coal extraction cost planning process Striving for the efficiency of activities is of great significance in the management of hard coal extractive enterprises, which are constantly subjected to the process of restructuring. Effective cost management is an important condition of the increase in the efficiency of the researched business entities’ activity. One of the tools whose basic objective is conscious influencing cost levels is target costing. The aim of this article is to analyse the conditions of implementing target costing in the planning of hard coal extraction costs in hard coal mines in Poland. The subject area raises a topical and important problem of the scope of solutions concerning cost analysis in hard coal mines in Poland, which has not been thoroughly researched yet. To achieve the abovementioned aim, the theoretical works of the subject area have been referenced. The mine management process is difficult and requires the application of best suited and most modern tools, including those used in the planning process of hard coal extraction costs in order to support the economic efficiency of mining operations. The use of the target costing concept in the planning of hard coal mine operations aims to support the decision-making process, so as to achieve a specified level of economic efficiency of the operations carried out in a territorially designated site of hard coal extraction.

  12. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks. © 2016 Society for Psychophysiological Research.

  13. Memory-type control charts in statistical process control

    NARCIS (Netherlands)

    Abbas, N.

    2012-01-01

    Control chart is the most important statistical tool to manage the business processes. It is a graph of measurements on a quality characteristic of the process on the vertical axis plotted against time on the horizontal axis. The graph is completed with control limits that cause variation mark. Once

  14. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  15. A plan quality classifier derived with overlap-wall-histogram of hollow organs for automatic IMRT plan quality control of prostate cancer cases

    Directory of Open Access Journals (Sweden)

    Ting Song

    2014-03-01

    Full Text Available Purpose: We developed a plan quality classification model to assess IMRT plan quality of prostate cancer patients for automatic plan quality control. Methods: For hollow organs such as rectum and bladder, dose-wall-histogram (DWH was used to evaluate OAR dose sparing in our institution. Correspondingly, we proposed a new descriptor called overlap-wall-histogram (OWH to describe the complex spatial relationship between PTV and a hollow organ. Two metrics calculated from the OWH and DWH are introduced to quantitatively evaluate the difficulty of patient geometry for planning and plan quality in terms of OAR sparing, respectively. A linear correlation between these two metrics was observed after plotting plan quality metric as a function of geometry difficulty metric studied from a database of prostate cases treated in our institution with acceptable plan quality. Thus, a fitting line was built acting as the boundary of high quality and poor quality plans. A query plan falling above the boundary is assessed as high quality, vice versa poor quality. Results: 15 prostate IMRT plans were used to test our model. One was identified as poor quality and the others were common-level. After re-planning all plans, the dose constraints for bladder wall W75 (percentage of wall receiving more than 75Gy, W70, W65 and W60 can be reduced by 3.34%, 3%, 6.99%, 6.54% for that poor quality plan and 1.11%, 0.95%, 1.45% and 1.81% averagely for the common-level quality group, without sacrificing PTV coverage and rectum dose sparing. Conclusion: An effective model was built to provide automatic IMRT plan quality control by evaluating hollow OAR dose sparing for prostate cancer patients. Furthermore, for the query plan with poor quality, potential improvement of plan quality can be estimated and a good reference plan with similar or harder geometry can be automatically chosen from our database to help guide the re-planning if necessary.---------------------------Cite this

  16. Controlling networking multimedia appliances: with an open environment - a plan-based approach

    OpenAIRE

    Jantz, D.; Heider, T.

    2000-01-01

    The need for a better user assistance in technical environments led to the birth of a planning assistant. The principal problems in representing real world tasks in this environment of multimedia home devices are explained. A special issue is the developed EMBASSI Generic Architecture to integrate networked multimedia appliances. The planning assistant engages planning algorithms to fullfill user desires without handling traditional technical control interfaces.

  17. The implementation of the integrated design process in the hole-plan system

    Directory of Open Access Journals (Sweden)

    Won-Sun Ruy

    2012-12-01

    Full Text Available All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  18. Information-educational environment with adaptive control of learning process

    Science.gov (United States)

    Modjaev, A. D.; Leonova, N. M.

    2017-01-01

    Recent years, a new scientific branch connected with the activities in social sphere management developing intensively and it is called "Social Cybernetics". In the framework of this scientific branch, theory and methods of management of social sphere are formed. Considerable attention is paid to the management, directly in real time. However, the decision of such management tasks is largely constrained by the lack of or insufficiently deep study of the relevant sections of the theory and methods of management. The article discusses the use of cybernetic principles in solving problems of control in social systems. Applying to educational activities a model of composite interrelated objects representing the behaviour of students at various stages of educational process is introduced. Statistical processing of experimental data obtained during the actual learning process is being done. If you increase the number of features used, additionally taking into account the degree and nature of variability of levels of current progress of students during various types of studies, new properties of students' grouping are discovered. L-clusters were identified, reflecting the behaviour of learners with similar characteristics during lectures. It was established that the characteristics of the clusters contain information about the dynamics of learners' behaviour, allowing them to be used in additional lessons. The ways of solving the problem of adaptive control based on the identified dynamic characteristics of the learners are planned.

  19. Optimization-based decision support systems for planning problems in processing industries

    OpenAIRE

    Claassen, G.D.H.

    2014-01-01

    Summary Optimization-based decision support systems for planning problems in processing industries Nowadays, efficient planning of material flows within and between supply chains is of vital importance and has become one of the most challenging problems for decision support in practice. The tremendous progress in hard- and software of the past decades was an important gateway for developing computerized systems that are able to support decision making on different levels within enterprises. T...

  20. Strengthening tactical planning and operational frameworks for vector control: the roadmap for malaria elimination in Namibia.

    Science.gov (United States)

    Chanda, Emmanuel; Ameneshewa, Birkinesh; Angula, Hans A; Iitula, Iitula; Uusiku, Pentrina; Trune, Desta; Islam, Quazi M; Govere, John M

    2015-08-05

    Namibia has made tremendous gains in malaria control and the epidemiological trend of the disease has changed significantly over the past years. In 2010, the country reoriented from the objective of reducing disease morbidity and mortality to the goal of achieving malaria elimination by 2020. This manuscript outlines the processes undertaken in strengthening tactical planning and operational frameworks for vector control to facilitate expeditious malaria elimination in Namibia. The information sources for this study included all available data and accessible archived documentary records on malaria vector control in Namibia. A methodical assessment of published and unpublished documents was conducted via a literature search of online electronic databases, Google Scholar, PubMed and WHO, using a combination of search terms. To attain the goal of elimination in Namibia, systems are being strengthened to identify and clear all infections, and significantly reduce human-mosquito contact. Particularly, consolidating vector control for reducing transmission at the identified malaria foci will be critical for accelerated malaria elimination. Thus, guarding against potential challenges and the need for evidence-based and sustainable vector control instigated the strengthening of strategic frameworks by: adopting the integrated vector management (IVM) strategy; initiating implementation of the global plan for insecticide resistance management (GPIRM); intensifying malaria vector surveillance; improving data collection and reporting systems on DDT; updating the indoor residual spraying (IRS) data collection and reporting tool; and, improving geographical reconnaissance using geographical information system-based satellite imagery. Universal coverage with IRS and long-lasting insecticidal nets, supplemented by larval source management in the context of IVM and guided by vector surveillance coupled with rational operationalization of the GPIRM, will enable expeditious

  1. Process evaluation of the Enabling Mothers toPrevent Pediatric Obesity Through Web-Based Learning and Reciprocal Determinism (EMPOWER) randomized control trial.

    Science.gov (United States)

    Knowlden, Adam P; Sharma, Manoj

    2014-09-01

    Family-and-home-based interventions are an important vehicle for preventing childhood obesity. Systematic process evaluations have not been routinely conducted in assessment of these interventions. The purpose of this study was to plan and conduct a process evaluation of the Enabling Mothers to Prevent Pediatric Obesity Through Web-Based Learning and Reciprocal Determinism (EMPOWER) randomized control trial. The trial was composed of two web-based, mother-centered interventions for prevention of obesity in children between 4 and 6 years of age. Process evaluation used the components of program fidelity, dose delivered, dose received, context, reach, and recruitment. Categorical process evaluation data (program fidelity, dose delivered, dose exposure, and context) were assessed using Program Implementation Index (PII) values. Continuous process evaluation variables (dose satisfaction and recruitment) were assessed using ANOVA tests to evaluate mean differences between groups (experimental and control) and sessions (sessions 1 through 5). Process evaluation results found that both groups (experimental and control) were equivalent, and interventions were administered as planned. Analysis of web-based intervention process objectives requires tailoring of process evaluation models for online delivery. Dissemination of process evaluation results can advance best practices for implementing effective online health promotion programs. © 2014 Society for Public Health Education.

  2. Model Development and Process Analysis for Lean Cellular Design Planning in Aerospace Assembly and Manufacturing

    Science.gov (United States)

    Hilburn, Monty D.

    Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These

  3. Processes of planning and management control application to ENEA context; Metodologie di pianificazione e controllo di gestione tradizionali ed innovative a confronto. Prospettive di applicazione in un ente complesso: l'ENEA

    Energy Technology Data Exchange (ETDEWEB)

    Palasciano, G [Bari Univ., Bari (Italy). Facolta' di Economia; Di Marco, R A [ENEA, Sede Centrale, Rome (Italy). Funzione Centrale Informatica; Leone, M E

    1999-07-01

    The process of planning and management control is a very important process which has the aim to establish the business goals and fix the way to achieve them. Before introducing briefly the subject of this work, some considerations are needed. The present context is characterized by new technologies which perturb the production field; by new markets which evolve in a very short time; by a global competition. As a consequence of this, the planning and management control process have to support the decision maker and supply him with strategical (not only book-keeping) information. In addition to the non-State sector, the State run organizations (first of all the ENEA, the subject of this degree dissertation) have also perceived, in the last few years, the need to improve themselves and conform their management control system to the new exigencies. But this is not only a need; this is an imposition. In fact, in this matter, many laws have been issued since 1990. They impose a reform both of the financial and management control, and a re-engineering of the cost accounting system. This degree thesis, made in collaboration between ENEA and University of Bari, is divided in two parts. The first concerns a theoretical treatise on the subject; it shows the problems found out in the planning and management control system of the non-State firms and suggests some solutions. In the second part there is a practical treatise where the new planning and management control techniques are applied to ENEA context, arriving to the revision of the balance scheme, according to the law 84/97. [Italian] Il processo di pianificazione e controllo di gestione e' un processo molto importante che ha lo scopo di stabilire gli obiettivi aziendali e fissare le modalita' per il loro conseguimento. Prima di introdurre brevemente l'argomento di cui tratta questo lavoro, si rendono necessarie alcune considerazioni. Il contesto attuale e' caratterizzato da nuove tecnologie che sconvolgono il mondo della

  4. Using the theory of planned behavior to determine factors influencing processed foods consumption behavior

    Science.gov (United States)

    Kim, Og Yeon; Shim, Soonmi

    2014-01-01

    BACKGROUND/OBJECTIVES The purpose of this study is to identify how level of information affected intention, using the Theory of Planned Behavior. SUBJECTS/METHODS The study was conducted survey in diverse community centers and shopping malls in Seoul, which yielded N = 209 datasets. To compare processed foods consumption behavior, we divided samples into two groups based on level of information about food additives (whether respondents felt that information on food additives was sufficient or not). We analyzed differences in attitudes toward food additives and toward purchasing processed foods, subjective norms, perceived behavioral control, and behavioral intentions to processed foods between sufficient information group and lack information group. RESULTS The results confirmed that more than 78% of respondents thought information on food additives was insufficient. However, the group who felt information was sufficient had more positive attitudes about consuming processed foods and behavioral intentions than the group who thought information was inadequate. This study found people who consider that they have sufficient information on food additives tend to have more positive attitudes toward processed foods and intention to consume processed foods. CONCLUSIONS This study suggests increasing needs for nutrition education on the appropriate use of processed foods. Designing useful nutrition education requires a good understanding of factors which influence on processed foods consumption. PMID:24944779

  5. Using the theory of planned behavior to determine factors influencing processed foods consumption behavior.

    Science.gov (United States)

    Seo, Sunhee; Kim, Og Yeon; Shim, Soonmi

    2014-06-01

    The purpose of this study is to identify how level of information affected intention, using the Theory of Planned Behavior. The study was conducted survey in diverse community centers and shopping malls in Seoul, which yielded N = 209 datasets. To compare processed foods consumption behavior, we divided samples into two groups based on level of information about food additives (whether respondents felt that information on food additives was sufficient or not). We analyzed differences in attitudes toward food additives and toward purchasing processed foods, subjective norms, perceived behavioral control, and behavioral intentions to processed foods between sufficient information group and lack information group. The results confirmed that more than 78% of respondents thought information on food additives was insufficient. However, the group who felt information was sufficient had more positive attitudes about consuming processed foods and behavioral intentions than the group who thought information was inadequate. This study found people who consider that they have sufficient information on food additives tend to have more positive attitudes toward processed foods and intention to consume processed foods. This study suggests increasing needs for nutrition education on the appropriate use of processed foods. Designing useful nutrition education requires a good understanding of factors which influence on processed foods consumption.

  6. Fuzzy control of pressurizer dynamic process

    International Nuclear Information System (INIS)

    Ming Zhedong; Zhao Fuyu

    2006-01-01

    Considering the characteristics of pressurizer dynamic process, the fuzzy control system that takes the advantages of both fuzzy controller and PID controller is designed for the dynamic process in pressurizer. The simulation results illustrate this type of composite control system is with better qualities than those of single fuzzy controller and single PID controller. (authors)

  7. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    Science.gov (United States)

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  8. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  9. Public Information Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project ''Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab

  10. The DOE Office of Environmental Restoration and Waste Management comprehensive integrated planning process

    International Nuclear Information System (INIS)

    Aiken, R.J.; Draffin, C.W. Jr.; Pflock, K.T.

    1992-01-01

    This paper reports that comprehensive integrated planning is critical to the ultimate success of the DOE Office of Environmental Restoration and Waste Management's (EM) program because of the significant technical and institutional complexities, the tens of billions of dollars required, the regulatory and fiscal uncertainty, and the multitude of federal, state, and private sector organizations involved. Using the philosophy that sound and forward looking planning should guide budgetary and management decisionmaking, and that clear priorities are essential to program success, EM's comprehensive approach includes strategic planning, the annually updated EM Five-Year Plan, the EM Management Plan, and Site Specific Plans. Roadmaps (which facilitate issue identification and resolution), Activity Data Sheets, prioritization methodologies, and installation-specific Progress Charts are among the tools employed in support of the EM integrated planning process

  11. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, Richard B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colwell, Jeffery A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  12. KPI-based activity planning for people working in flexible processes

    NARCIS (Netherlands)

    Eck, van M.L.; Sidorova, N.; Aalst, van der W.M.P.; Grabis, J.; Sandkuhl, K.

    2015-01-01

    Planning human activities within business processes often happens based on the same methods and algorithms as are used in the area of manufacturing systems. However, human resources are more complex than machines. Their performance depends on a number of factors, including stress, personal

  13. Human movement data for malaria control and elimination strategic planning.

    Science.gov (United States)

    Pindolia, Deepa K; Garcia, Andres J; Wesolowski, Amy; Smith, David L; Buckee, Caroline O; Noor, Abdisalan M; Snow, Robert W; Tatem, Andrew J

    2012-06-18

    Recent increases in funding for malaria control have led to the reduction in transmission in many malaria endemic countries, prompting the national control programmes of 36 malaria endemic countries to set elimination targets. Accounting for human population movement (HPM) in planning for control, elimination and post-elimination surveillance is important, as evidenced by previous elimination attempts that were undermined by the reintroduction of malaria through HPM. Strategic control and elimination planning, therefore, requires quantitative information on HPM patterns and the translation of these into parasite dispersion. HPM patterns and the risk of malaria vary substantially across spatial and temporal scales, demographic and socioeconomic sub-groups, and motivation for travel, so multiple data sets are likely required for quantification of movement. While existing studies based on mobile phone call record data combined with malaria transmission maps have begun to address within-country HPM patterns, other aspects remain poorly quantified despite their importance in accurately gauging malaria movement patterns and building control and detection strategies, such as cross-border HPM, demographic and socioeconomic stratification of HPM patterns, forms of transport, personal malaria protection and other factors that modify malaria risk. A wealth of data exist to aid filling these gaps, which, when combined with spatial data on transport infrastructure, traffic and malaria transmission, can answer relevant questions to guide strategic planning. This review aims to (i) discuss relevant types of HPM across spatial and temporal scales, (ii) document where datasets exist to quantify HPM, (iii) highlight where data gaps remain and (iv) briefly put forward methods for integrating these datasets in a Geographic Information System (GIS) framework for analysing and modelling human population and Plasmodium falciparum malaria infection movements.

  14. A quality improvement plan for hypertension control: the INCOTECA Project (INterventions for COntrol of hyperTEnsion in CAtalonia).

    Science.gov (United States)

    Vallès-Fernandez, Roser; Rosell-Murphy, Magdalena; Correcher-Aventin, Olga; Mengual-Martínez, Lucas; Aznar-Martínez, Núria; Prieto-De Lamo, Gemma; Franzi-Sisó, Alícia; Puig-Manresa, Jordi; Ma Bonet-Simó, Josep

    2009-03-25

    Different studies have shown insufficient blood pressure (BP) control in hypertensive patients. Multiple factors influence hypertension management, and the quality of primary care is one of them. We decided therefore to evaluate the effectiveness of a quality improvement plan directed at professionals of Primary Health Care Teams (PHCT) with the aim to achieve a better control of hypertension. The hypothesis of the study is that the implementation of a quality improvement plan will improve the control of hypertension. The primary aim of this study will be to evaluate the effectiveness of this plan. multicentric study quasi-experimental before - after with control group. The non-randomised allocation of the intervention will be done at PHCT level. 18 PHCT in the Barcelona province (Spain). all patients with a diagnosis of hypertension (population based study). patients with a diagnosis of hypertension made later than 01/01/2006 and patients younger than 18 years. a quality improvement plan, which targets primary health care professionals and includes educational sessions, feedback to health professionals, audit and implementation of recommended clinical practice guidelines for the management of hypertensive patients. age, sex, associated co-morbidity (diabetes mellitus type I and II, heart failure and renal failure). The following variables will be recorded: BP measurement, cardiovascular risk and antihypertensive drugs used. Results will be measured before the start of the intervention and twelve months after the start of the study. Dependent variable: prevalence of hypertensive patients with poor BP control. Chi-square test and Student's t-test will be used to measure the association between independent qualitative and quantitative variables, respectively. Non-parametric tests will be used for the analysis of non-normally distributed variables. Significance level (alpha) will be set at improvement plan might benefit the coordination of different professionals of

  15. A quality improvement plan for hypertension control: the INCOTECA Project (INterventions for COntrol of hyperTEnsion in CAtalonia

    Directory of Open Access Journals (Sweden)

    Vallès-Fernandez Roser

    2009-03-01

    Full Text Available Abstract Background Different studies have shown insufficient blood pressure (BP control in hypertensive patients. Multiple factors influence hypertension management, and the quality of primary care is one of them. We decided therefore to evaluate the effectiveness of a quality improvement plan directed at professionals of Primary Health Care Teams (PHCT with the aim to achieve a better control of hypertension. The hypothesis of the study is that the implementation of a quality improvement plan will improve the control of hypertension. The primary aim of this study will be to evaluate the effectiveness of this plan. Methods and design Design: multicentric study quasi-experimental before – after with control group. The non-randomised allocation of the intervention will be done at PHCT level. Setting: 18 PHCT in the Barcelona province (Spain. Sample: all patients with a diagnosis of hypertension (population based study. Exclusion criteria: patients with a diagnosis of hypertension made later than 01/01/2006 and patients younger than 18 years. Intervention: a quality improvement plan, which targets primary health care professionals and includes educational sessions, feedback to health professionals, audit and implementation of recommended clinical practice guidelines for the management of hypertensive patients. Measurements: age, sex, associated co-morbidity (diabetes mellitus type I and II, heart failure and renal failure. The following variables will be recorded: BP measurement, cardiovascular risk and antihypertensive drugs used. Results will be measured before the start of the intervention and twelve months after the start of the study. Dependent variable: prevalence of hypertensive patients with poor BP control. Analysis: Chi-square test and Student's t-test will be used to measure the association between independent qualitative and quantitative variables, respectively. Non-parametric tests will be used for the analysis of non

  16. Statistical Process Control for KSC Processing

    Science.gov (United States)

    Ford, Roger G.; Delgado, Hector; Tilley, Randy

    1996-01-01

    The 1996 Summer Faculty Fellowship Program and Kennedy Space Center (KSC) served as the basis for a research effort into statistical process control for KSC processing. The effort entailed several tasks and goals. The first was to develop a customized statistical process control (SPC) course for the Safety and Mission Assurance Trends Analysis Group. The actual teaching of this course took place over several weeks. In addition, an Internet version of the same course complete with animation and video excerpts from the course when it was taught at KSC was developed. The application of SPC to shuttle processing took up the rest of the summer research project. This effort entailed the evaluation of SPC use at KSC, both present and potential, due to the change in roles for NASA and the Single Flight Operations Contractor (SFOC). Individual consulting on SPC use was accomplished as well as an evaluation of SPC software for KSC use in the future. A final accomplishment of the orientation of the author to NASA changes, terminology, data format, and new NASA task definitions will allow future consultation when the needs arise.

  17. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  18. Contamination Control and Hardware Processing Solutions at Marshall Space Flight Center

    Science.gov (United States)

    Burns, DeWitt H.; Hampton, Tammy; Huey, LaQuieta; Mitchell, Mark; Norwood, Joey; Lowrey, Nikki

    2012-01-01

    The Contamination Control Team of Marshall Space Flight Center's Materials and Processes Laboratory supports many Programs/ Projects that design, manufacture, and test a wide range of hardware types that are sensitive to contamination and foreign object damage (FOD). Examples where contamination/FOD concerns arise include sensitive structural bondline failure, critical orifice blockage, seal leakage, and reactive fluid compatibility (liquid oxygen, hydrazine) as well as performance degradation of sensitive instruments or spacecraft surfaces such as optical elements and thermal control systems. During the design phase, determination of the sensitivity of a hardware system to different types or levels of contamination/FOD is essential. A contamination control and FOD control plan must then be developed and implemented through all phases of ground processing, and, sometimes, on-orbit use, recovery, and refurbishment. Implementation of proper controls prevents cost and schedule impacts due to hardware damage or rework and helps assure mission success. Current capabilities are being used to support recent and on-going activities for multiple Mission Directorates / Programs such as International Space Station (ISS), James Webb Space Telescope (JWST), Space Launch System (SLS) elements (tanks, engines, booster), etc. The team also advances Green Technology initiatives and addresses materials obsolescence issues for NASA and external customers, most notably in the area of solvent replacement (e.g. aqueous cleaners containing hexavalent chrome, ozone depleting chemicals (CFC s and HCFC's), suspect carcinogens). The team evaluates new surface cleanliness inspection and cleaning technologies (e.g. plasma cleaning), and maintains databases for processing support materials as well as outgassing and optical compatibility test results for spaceflight environments.

  19. Control system for technological processes in tritium processing plants with process analysis

    International Nuclear Information System (INIS)

    Retevoi, Carmen Maria; Stefan, Iuliana; Balteanu, Ovidiu; Stefan, Liviu; Bucur, Ciprian

    2005-01-01

    Integration of a large variety of installations and equipment into a unitary system for controlling the technological process in tritium processing nuclear facilities appears to be a rather complex approach particularly when experimental or new technologies are developed. Ensuring a high degree of versatility allowing easy modifications in configurations and process parameters is a major requirement imposed on experimental installations. The large amount of data which must be processed, stored and easily accessed for subsequent analyses imposes development of a large information network based on a highly integrated system containing the acquisition, control and technological process analysis data as well as data base system. On such a basis integrated systems of computation and control able to conduct the technological process could be developed as well protection systems for cases of failures or break down. The integrated system responds to the control and security requirements in case of emergency and of the technological processes specific to the industry that processes radioactive or toxic substances with severe consequences in case of technological failure as in the case of tritium processing nuclear plant. In order to lower the risk technological failure of these processes an integrated software, data base and process analysis system are developed, which, based on identification algorithm of the important parameters for protection and security systems, will display the process evolution trend. The system was checked on a existing plant that includes a removal tritium unit, finally used in a nuclear power plant, by simulating the failure events as well as the process. The system will also include a complete data base monitoring all the parameters and a process analysis software for the main modules of the tritium processing plant, namely, isotope separation, catalytic purification and cryogenic distillation

  20. Enhanced Control of Mercury and other HAPs by Innovative Modifications to Wet FGD Processes

    International Nuclear Information System (INIS)

    Hargrove, O.W.; Carey, T.R.; Richardson, C.F.; Skarupa, R.C.; Meserole, F.B.; Rhudy, R.G.; Brown, Thomas D.

    1997-01-01

    The overall objective of this project was to learn more about controlling emissions of hazardous air pollutants (HAPs) from coal-fired power plants that are equipped with wet flue gas desulfurization (FGD) systems. The project was included by FETC as a Phase I project in its Mega-PRDA program. Phase I of this project focused on three research areas. These areas in order of priority were: (1) Catalytic oxidation of vapor-phase elemental mercury; (2) Enhanced particulate-phase HAPs removal by electrostatic charging of liquid droplets; and (3) Enhanced mercury removal by addition of additives to FGD process liquor. Mercury can exist in two forms in utility flue gas--as elemental mercury and as oxidized mercury (predominant form believed to be HgCl 2 ). Previous test results have shown that wet scrubbers effectively remove the oxidized mercury from the gas but are ineffective in removing elemental mercury. Recent improvements in mercury speciation techniques confirm this finding. Catalytic oxidation of vapor-phase elemental mercury is of interest in cases where a wet scrubber exists or is planned for SO 2 control. If a loW--cost process could be developed to oxidize all of the elemental mercury in the flue gas, then the maximum achievable mercury removal across the existing or planned wet scrubber would increase. Other approaches for improving control of HAPs included a method for improving particulate removal across the FGD process and the use of additives to increase mercury solubility. This paper discusses results related only to catalytic oxidation of elemental mercury

  1. 75 FR 18142 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Science.gov (United States)

    2010-04-09

    ...The EPA is proposing to approve revisions to the Texas State Implementation Plan (SIP) that amend Title 30 of the Texas Administrative Code (TAC), Chapter 114, Control of Air Pollution from Motor Vehicles. The State submitted these revisions on May 15, 2006, October 10, 2006, January 17, 2008, and February 28, 2008. These revisions establish the Rebate Grant Process and the Texas Clean School Bus Program under the Texas Emissions Reduction Plan (TERP), further amend the TERP, and amend the Locally Enforced Motor Vehicle Idling Limitations. The EPA is proposing to approve these SIP revisions because they allow for clarity and consistency of the SIP requirements. The EPA is proposing to approve these revisions pursuant to section 110 of the Federal Clean Air Act (CAA).

  2. Strategic investment of embodied energy during the architectural planning process

    NARCIS (Netherlands)

    Hildebrand, L.

    2014-01-01

    It is an interesting time in the building industry; for more than one decade sustainability is a planning parameter that essentially impacts construction related processes. Reduction of operational energy was initiated after the oil crisis and changed the type of construction by including heat

  3. Metodología para elaborar el Plan Maestro de Validación de los procesos de producción del Centro Nacional de Sanidad Agropecuaria Methodology to design the Master Plan of Validation of production processes of National Center of Agricultural Health

    Directory of Open Access Journals (Sweden)

    Nivian Montes de Oca

    2010-06-01

    Full Text Available La metodología para la elaboración del Plan Maestro de Validación de los procesos de producción del Centro Nacional de Sanidad Agropecuaria, se diseñó a partir de los requisitos contenidos en la Regulación 16 del 2006 de Buenas Prácticas de Fabricación de medicamentos. Abarcó la política de la organización para la actividad de validación su estructura organizativa, las instalaciones, sistemas, equipos y procesos que se deben validar; el formato de la documentación a utilizar; la planificación y calendario de cada actividad; los resultados de cada protocolo ejecutado, el control de los cambios que se generan; un resumen de las validaciones anteriores; cumplimiento del plan propuesto; las conclusiones donde se precisan de forma resumida si los procesos validados están bajo control, los resultados más relevantes, así como las acciones correctivas y preventivas a tomar; por último se define la distribución de toda la información generada, conformando así el Plan Maestro de Validación. Este sistema de validación se muestra a través de procedimientos, protocolos y registros aplicados en el proceso de fabricación de Surfacen®, medicamento para uso humano que se fabrica en el Centro Nacional de Sanidad Agropecuaria.The methodology to design the Validation Master Plan the production processes of National Center of Agricultural Health was created from the requirements present in the Regulation 16, 2006 of Good Practices of drugs manufacture including the organization policy for validation activity of its organizing structure, installations, systems, equipments and processes to be validated, documentation format used, planning and calendar of each activity; the results from each protocol performed, the generating changes control, abstract of prior validations, fulfillment of proposed plan, conclusions where are determined in a summarized way if the validated processes are under control, the more relevant results, as well as how

  4. Challenges of Measuring Performance of the Sales and Operations Planning Process

    OpenAIRE

    Hulthén, Hana; Näslund, Dag; Norrman, Andreas

    2017-01-01

    The purpose of this study is to identify and structure challenges of measuring performance of the Sales and Operations Planning (S&OP) process. A multiple case study methodology was applied. Qualitative data was collected via 22 structured interviews with managers from six case companies in various industries. A process oriented framework was proposed by structuring the challenges based on two key areas of process performance (effectiveness and efficiency) and different maturity levels of the...

  5. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  6. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  7. Welding process modelling and control

    Science.gov (United States)

    Romine, Peter L.; Adenwala, Jinen A.

    1993-01-01

    The research and analysis performed, and software developed, and hardware/software recommendations made during 1992 in development of the PC-based data acquisition system for support of Welding Process Modeling and Control is reported. A need was identified by the Metals Processing Branch of NASA Marshall Space Flight Center, for a mobile data aquisition and analysis system, customized for welding measurement and calibration. Several hardware configurations were evaluated and a PC-based system was chosen. The Welding Measurement System (WMS) is a dedicated instrument, strictly for the use of data aquisition and analysis. Although the WMS supports many of the functions associated with the process control, it is not the intention for this system to be used for welding process control.

  8. Variation and Control of Process Behavior

    International Nuclear Information System (INIS)

    Pawlicki, Todd; Whitaker, Matthew

    2008-01-01

    The purpose of this work was to highlight the importance of controlling process variability for successful quality assurance (QA). We describe the method of statistical process control for characterizing and controlling a process. Traditionally, QA has been performed by comparing some important measurement (e.g., linear accelerator output) against a corresponding specification. Although useful in determining the fitness of a particular measurement, this approach does not provide information about the underlying process behavior over time. A modern view of QA is to consider the time-ordered behavior of a process. Every process displays characteristic behaviors that are independent of the specifications imposed on it. The goal of modern QA is, not only to ensure that a process is on-target, but that it is also operating with minimal variation. This is accomplished by way of a data-driven approach using process behavior charts. The development of process behavior charts, historically known as control charts, and process behavior (action) limits are described. The effect these concepts have on quality management is also discussed

  9. Science-based information processing in the process control of power stations

    International Nuclear Information System (INIS)

    Weisang, C.

    1992-01-01

    Through the application of specialized systems, future-orientated information processing integrates the sciences of processes, control systems, process control strategies, user behaviour and ergonomics. Improvements in process control can be attained, inter alia, by the preparation of the information contained (e.g. by suppressing the flow of signals and replacing it with signals which are found on substance) and also by an ergonomic representation of the study of the process. (orig.) [de

  10. Setting planned leadtimes in customer-order-driven assembly systems

    NARCIS (Netherlands)

    Atan, Z.; Kok, de A.G.; Dellaert, N.P.; Janssen, F.B.S.L.P.; Boxel, van R.

    2016-01-01

    We study an assembly system with a number of parallel multistage processes feeding a multistage final assembly process. Each stage has a stochastic throughput time. We assume that the system is controlled by planned leadtimes at each stage. From these planned leadtimes the start and due times of all

  11. A prioritization methodology to strategic planning process

    International Nuclear Information System (INIS)

    Rondinelli Junior, Francisco; Cherif, Hadj Slimane

    2009-01-01

    In the process of formulation of a Strategic Plan, there is always a step that deals with choices among different options and strategies. To do that a prioritization methodology has to be applied in order to achieve the higher needs identified along the analysis and evaluation of problems. To assign priorities within a set of needs/problems of a strategic nature and identified within various areas of activity or different sectors, it is proposed a methodology that envisage the use of specific attributes for which a graded scale of values is established for each need/problem, which, at the end of the process, allows a quantitative comparison among them. The methodology presented in this paper was developed following an approach that has been used in many areas over the last 20 years by various public and private institutions, and also by international organizations involved in promotion and development work. (author)

  12. The spill prevention, control, and countermeasures (SPCC) plan for the Y-12 Plant. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    This spill prevention, control and countermeasures (SPCC) Plan is divided into two volumes. Volume I addresses Y-12`s compliance with regulations pertinent to the content of SPCC Plans. Volume II is the SPCC Hazardous Material Storage Data Base, a detailed tabulation of facility-specific information and data on potential spill sources at the Y-12 Plant. Volume I follows the basic format and subject sequence specified in 40 CFR 112.7. This sequence is prefaced by three additional chapters, including this introduction and brief discussions of the Y-12 Plant`s background/environmental setting and potential spill source categories. Two additional chapters on containers and container storage areas and PCB and PCB storage for disposal facilities are inserted into the required sequence. The following required subjects are covered in this volume: Spill history, site drainage; secondary containment/diversion structures and equipment; contingency plans; notification and spill response procedures; facility drainage; bulk storage tanks; facility transfer operations, pumping, and in-plant processes; transfer stations (facility tank cars/tank tracks); inspections and records; security, and personnel, training, and spill prevention procedures.

  13. Prestudy: Inventory and review of risk analysis applications in the grid planning process; Foerstudie: Inventering och redovisning av riskanalys-tillaempningar i naetplanerings-processen

    Energy Technology Data Exchange (ETDEWEB)

    Owe, Pernilla

    2007-11-15

    The project investigates the network planning process and the risks connected to this. The purpose is to investigate which parts of the process that are most suited for implementation of risk analysis applications. The project is divided in two parts of which this report describes the first part. Experiences from distribution and sub transmission network, in urban areas as well as in rural areas, were gathered through interviews with staff from Fortum, E.ON and Vattenfall. There are differences in the network planning processes in the companies, depending on their needs and organization, but at a higher level the processes shows to be quite similar to each other. Both network analysis and optimization are included in the network planning process that is further described in section 3.1, in other words the planning from idea or need to the project decision. The detailed project design is not included in the process. The found hazards are on many counts the same for all network companies. The larger companies have some kind of risk policy or comprehensive risk control function, but the extension and application differs. It is most likely that also this will be more and more similar in the future, due to benchmarking and best practice. The evaluation and ranking of the risks was not a task in this first part of the project, but should be handled in the second part

  14. Evaluation of extreme temperature events in northern Spain based on process control charts

    Science.gov (United States)

    Villeta, M.; Valencia, J. L.; Saá, A.; Tarquis, A. M.

    2018-02-01

    Extreme climate events have recently attracted the attention of a growing number of researchers because these events impose a large cost on agriculture and associated insurance planning. This study focuses on extreme temperature events and proposes a new method for their evaluation based on statistical process control tools, which are unusual in climate studies. A series of minimum and maximum daily temperatures for 12 geographical areas of a Spanish region between 1931 and 2009 were evaluated by applying statistical process control charts to statistically test whether evidence existed for an increase or a decrease of extreme temperature events. Specification limits were determined for each geographical area and used to define four types of extreme anomalies: lower and upper extremes for the minimum and maximum anomalies. A new binomial Markov extended process that considers the autocorrelation between extreme temperature events was generated for each geographical area and extreme anomaly type to establish the attribute control charts for the annual fraction of extreme days and to monitor the occurrence of annual extreme days. This method was used to assess the significance of changes and trends of extreme temperature events in the analysed region. The results demonstrate the effectiveness of an attribute control chart for evaluating extreme temperature events. For example, the evaluation of extreme maximum temperature events using the proposed statistical process control charts was consistent with the evidence of an increase in maximum temperatures during the last decades of the last century.

  15. Regulatory systems for the control of land remediation processes

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, J.; Vijgen, J.; Summersgill, M.

    2003-07-01

    One of the recurring themes in looking at land remediation over the last decade has been identifying and overcoming barriers to the use of innovative, sustainable technologies, whilst still ensuring that there are no adverse environmental impacts from their use. In parallel with this, the regeneration of brownfield sites has increasingly needed effective and economic solutions that leave the site without the stigma of being associated with contamination and waste disposal. Regulatory controls are often identified as one of the main barriers to both of these objectives. Previously, the focus of attention in the study of regulatory controls relating to land contamination has largely been on regimes that trigger the need for clean-up. These may be pollution control legislation or land-use planning controls. However, the focus of this paper will be on the controls on the selection and implementation of the remediation technologies and processes themselves. It will look in particular at the European-wide controls on waste management, pollution prevention and environmental impact assessment. The UK work is being carried out by a working group involving: landowners; developers; public sector regeneration agencies; house-builders; industry; insurers; technology providers; professional advisers; local government authorities; and national government regulators and policy-makers. This multi-stakeholder approach has facilitated the identification of practical, legal, financial and administrative issues to assist in developing new solutions. (orig.)

  16. Human movement data for malaria control and elimination strategic planning

    Directory of Open Access Journals (Sweden)

    Pindolia Deepa K

    2012-06-01

    Full Text Available Abstract Recent increases in funding for malaria control have led to the reduction in transmission in many malaria endemic countries, prompting the national control programmes of 36 malaria endemic countries to set elimination targets. Accounting for human population movement (HPM in planning for control, elimination and post-elimination surveillance is important, as evidenced by previous elimination attempts that were undermined by the reintroduction of malaria through HPM. Strategic control and elimination planning, therefore, requires quantitative information on HPM patterns and the translation of these into parasite dispersion. HPM patterns and the risk of malaria vary substantially across spatial and temporal scales, demographic and socioeconomic sub-groups, and motivation for travel, so multiple data sets are likely required for quantification of movement. While existing studies based on mobile phone call record data combined with malaria transmission maps have begun to address within-country HPM patterns, other aspects remain poorly quantified despite their importance in accurately gauging malaria movement patterns and building control and detection strategies, such as cross-border HPM, demographic and socioeconomic stratification of HPM patterns, forms of transport, personal malaria protection and other factors that modify malaria risk. A wealth of data exist to aid filling these gaps, which, when combined with spatial data on transport infrastructure, traffic and malaria transmission, can answer relevant questions to guide strategic planning. This review aims to (i discuss relevant types of HPM across spatial and temporal scales, (ii document where datasets exist to quantify HPM, (iii highlight where data gaps remain and (iv briefly put forward methods for integrating these datasets in a Geographic Information System (GIS framework for analysing and modelling human population and Plasmodium falciparum malaria infection movements.

  17. Principles of lean planning and control

    NARCIS (Netherlands)

    Riezebos, J.

    2015-01-01

    Lean production systems use teams instead of functional departments as well as simple shop floor control methods to manage the flow of orders at the shop floor. Lean shop floor control focuses on robust and visual methods that are able to cope with variation in processing times, routing sequences,

  18. Incorporating healthcare informatics into the strategic planning process in nursing education.

    Science.gov (United States)

    Sackett, Kay; Jones, Janice; Erdley, W Scott

    2005-01-01

    The purpose of this article is to describe the incorporation of healthcare informatics into the strategic planning process in nursing education. An exemplar from the University at Buffalo, the State University of New York School of Nursing, is interwoven throughout the article. The challenges and successes inherent in a paradigm shift embracing the multifaceted adoption of technology in higher education are illustrated. The paradigm shift that necessitated this change, the need for informatics standards and competencies identified by regulatory agencies and the relationship of the triad mission of the Academy which includes research, teaching and service are then elucidated. Information pertinent to the strategic planning process is described including the use of a strengths, weaknesses, opportunities and threats (SWOT) analysis to facilitate the integration of a healthcare informatics model into a nursing curriculum.

  19. Supporting Cross-Organizational Process Control

    Science.gov (United States)

    Angelov, Samuil; Vonk, Jochem; Vidyasankar, Krishnamurthy; Grefen, Paul

    E-contracts express the rights and obligations of parties through a formal, digital representation of the contract provisions. In process intensive relationships, e-contracts contain business processes that a party promises to perform for the counter party, optionally allowing monitoring of the execution of the promised processes. In this paper, we describe an approach in which the counter party is allowed to control the process execution. This approach will lead to more flexible and efficient business relations which are essential in the context of modern, highly dynamic and complex collaborations among companies. We present a specification of the process controls available to the consumer and their support in the private process specification of the provider.

  20. Guidelines for inclusion: Ensuring Indigenous peoples' involvement in water planning processes across South Eastern Australia

    Science.gov (United States)

    Saenz Quitian, Alejandra; Rodríguez, Gloria Amparo

    2016-11-01

    Indigenous peoples within the Murray-Darling Basin have traditionally struggled for the recognition of their cultural, social, environmental, spiritual, commercial and economic connection to the waters that they have traditionally used, as well as their right to engage in all stages of water planning processes. Despite Australian national and federal frameworks providing for the inclusion of Indigenous Australians' objectives in planning frameworks, water plans have rarely addressed these objectives in water, or the strategies to achieve them. Indeed, insufficient resources, a lack of institutional capacity in both Indigenous communities and agencies and an inadequate understanding of Indigenous people's objectives in water management have limited the extent to which Indigenous objectives are addressed in water plans within the Murray-Darling Basin. In this context, the adoption of specific guidelines to meet Indigenous requirements in relation to basin water resources is crucial to support Indigenous engagement in water planning processes. Using insights from participatory planning methods and human rights frameworks, this article outlines a set of alternative and collaborative guidelines to improve Indigenous involvement in water planning and to promote sustainable and just water allocations.

  1. Processes of planning and management control application to ENEA context; Metodologie di pianificazione e controllo di gestione tradizionali ed innovative a confronto. Prospettive di applicazione in un ente complesso: l'ENEA

    Energy Technology Data Exchange (ETDEWEB)

    Palasciano, G. [Bari Univ., Bari (Italy). Facolta' di Economia; Di Marco, R. A. [ENEA, Sede Centrale, Rome (Italy). Funzione Centrale Informatica; Leone, M.E.

    1999-07-01

    The process of planning and management control is a very important process which has the aim to establish the business goals and fix the way to achieve them. Before introducing briefly the subject of this work, some considerations are needed. The present context is characterized by new technologies which perturb the production field; by new markets which evolve in a very short time; by a global competition. As a consequence of this, the planning and management control process have to support the decision maker and supply him with strategical (not only book-keeping) information. In addition to the non-State sector, the State run organizations (first of all the ENEA, the subject of this degree dissertation) have also perceived, in the last few years, the need to improve themselves and conform their management control system to the new exigencies. But this is not only a need; this is an imposition. In fact, in this matter, many laws have been issued since 1990. They impose a reform both of the financial and management control, and a re-engineering of the cost accounting system. This degree thesis, made in collaboration between ENEA and University of Bari, is divided in two parts. The first concerns a theoretical treatise on the subject; it shows the problems found out in the planning and management control system of the non-State firms and suggests some solutions. In the second part there is a practical treatise where the new planning and management control techniques are applied to ENEA context, arriving to the revision of the balance scheme, according to the law 84/97. [Italian] Il processo di pianificazione e controllo di gestione e' un processo molto importante che ha lo scopo di stabilire gli obiettivi aziendali e fissare le modalita' per il loro conseguimento. Prima di introdurre brevemente l'argomento di cui tratta questo lavoro, si rendono necessarie alcune considerazioni. Il contesto attuale e' caratterizzato da nuove tecnologie che

  2. The Modern Management of Urban Planning and the Controlling Planning

    Institute of Scientific and Technical Information of China (English)

    1991-01-01

    <正> Since 1980s,with the further reform of political and economic systems,the urban construc-tion in our country has undergone great changes,greater than ever.Such changes pose a series ofnew problems to urban planning:How should planning be suitable for the development of moderncities?How should planning management coordinate with urban planning?How to carry out ur-ban planning under new situations? etc.The answers to these problems lie in one point:urbanplanning and plann ing management must be restructured.Only when the former is well com-bined with the latter can the above problems be solved satisfactorily.This article provides someviews in this respect.

  3. Planning to Improvise? The Role of Reasoning in the Strategy Process: Evidence from Malaysia

    OpenAIRE

    Hughes, Paul; Hodgkinson, Ian R.; Arshad, Darwina; Hughes, Mathew; Leone, Vitor

    2017-01-01

    The file attached to this record is the author's final peer reviewed version. The Publisher's final version can be found by following the DOI link. Planning and improvisation are depicted as alternate decision-making orientations in the strategy process literature, executed by two parallel cognitive contexts: rational or intuitive, but can rationality and intuition be harmonised in the strategy process? Strategic managers may not have to choose to either plan or improvise, rather there is ...

  4. Processes subject to integrated pollution control. Petroleum processes: oil refining and associated processes

    International Nuclear Information System (INIS)

    1995-01-01

    This document, part of a series offering guidance on pollution control regulations issued by Her Majesty's Inspectorate of Pollution, (HMIP) focuses on petroleum processes such as oil refining and other associated processes. The various industrial processes used, their associated pollution release routes into the environment and techniques for controlling these releases are all discussed. Environmental quality standards are related to national and international agreements on pollution control and abatement. HMIP's work on air, water and land pollution monitoring is also reported. (UK)

  5. Applicability of statistical process control techniques

    NARCIS (Netherlands)

    Schippers, W.A.J.

    1998-01-01

    This paper concerns the application of Process Control Techniques (PCTs) for the improvement of the technical performance of discrete production processes. Successful applications of these techniques, such as Statistical Process Control Techniques (SPC), can be found in the literature. However, some

  6. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    International Nuclear Information System (INIS)

    Shields, K.D.; Ballinger, M.Y.

    1999-03-01

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities

  7. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  8. Red Plague Control Plan (RPCP)

    Science.gov (United States)

    Cooke, Robert W.

    2010-01-01

    SCOPE: Prescribes the minimum requirements for the control of cuprous / cupric oxide corrosion (a.k.a. Red Plague) of silver-coated copper wire, cable, and harness assemblies. PURPOSE: Targeted for applications where exposure to assembly processes, environmental conditions, and contamination may promote the development of cuprous / cupric oxide corrosion (a.k.a. Red Plague) in silver-coated copper wire, cable, and harness assemblies. Does not exclude any alternate or contractor-proprietary documents or processes that meet or exceed the baseline of requirements established by this document. Use of alternate or contractor-proprietary documents or processes shall require review and prior approval of the procuring NASA activity.

  9. Acceptance test plan for the Waste Information Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  10. An expert system for process planning of sheet metal parts produced ...

    Indian Academy of Sciences (India)

    Sachin Salunkhe

    set of production rules and frames for process planning of axisymmetric deep ... parameters for design of stamping die for manufacturing of circular cup with ..... proper sequence of operations to manufacture sheet metal part correctly and ...

  11. Automatic Scheduling and Planning (ASAP) in future ground control systems

    Science.gov (United States)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  12. 300 Area Process Trenches Modified Closure/Postclosure Plan

    International Nuclear Information System (INIS)

    1997-09-01

    This chapter provides a brief summary of the contents of each chapter of this plan for the closure of the 300 Area Process Trenches (300 APT) treatment, storage, and/or disposal unit. It also provides background information for this unit and discusses how its closure will be integrated with the remedial action for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 300- FF-1 Operable Unit. The 300 APT is located within the 300 Area of the Hanford Site. This area contained reactor fuel fabrication facilities and research and development laboratories. The 300 APT was constructed and began operations in 1975 as the 316-5 Process Trenches. Effluent was discharged to the trenches by way of the 300 Area process sewer system, which has been the sole source of effluent for the 300 APT. The 316-5 Process Trenches gained Resource Conservation and Recovery Act of 1976 (RCRA) interim status as the 300 APT TSD unit on November 11, 1985. The unit has been administratively closed to discharges of dangerous waste since 1985

  13. Promoting cross-sector partnerships in child welfare: qualitative results from a five-state strategic planning process.

    Science.gov (United States)

    Collins-Camargo, Crystal; Armstrong, Mary I; McBeath, Bowen; Chuang, Emmeline

    2013-01-01

    Little is known about effective strategic planning for public and private child welfare agencies working together to serve families. During a professionally facilitated, strategic planning event, public and private child welfare administrators from five states explored partnership challenges and strengths with a goal of improving collaborative interactions in order to improve outcomes for children and families. Summarizing thematic results of session notes from the planning event, this article describes effective strategies for facilitation of such processes as well as factors that challenge or promote group processes. Implications for conducting strategic planning in jurisdictions seeking to improve public/private partnerships are discussed.

  14. Microprocessors control of fermentation process

    Energy Technology Data Exchange (ETDEWEB)

    Fawzy, A S; Hinton, O R

    1980-01-01

    This paper presents three schemes for the solution of the optimal control of fermentation process. It also shows the advantages of using microprocessors in controlling and monitoring this process. A linear model of the system is considered. An optimal feedback controller is determined which maintains the states (substrate and organisms concentration) at desired values when the system is subjected to disturbances in the influent substrate and organisms concentration. Simulation results are presented for the three cases.

  15. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  16. Integration of value stream map and strategic layout planning into DMAIC approach to improve carpeting process

    Energy Technology Data Exchange (ETDEWEB)

    Nagi, A.; Altarazi, S.

    2017-07-01

    This paper presents an implementation of the Six Sigma DMAIC approach implementing lean tools and facilities layout techniques to reduce the occurrence of different types of nonconformities in the carpeting process. Such carpeting process can be found in several industries such as construction, aviation, and automotive. Design/methodology/approach: The improvement process was built through a sequential implementation of appropriate interconnected tools at each phase of the DMAIC approach. Utilized tools included: Pareto analysis, control charts, Ishikawa chart, 5-whys, failure mode and effect analysis, process capability ratio, value stream mapping, and strategic layout planning. Findings: The carpeting process capability, quality of the product, customer satisfaction, and cost of poor quality were significantly improved. Explicitly, the sigma level was improved from 2.297 to 2.886 and the defects per million opportunities (DPMO) was reduced from 21615 to 3905. Originality/value: This paper has approved the capability of the Six Sigma DMAIC approach to analyze, investigate, and remove the root causes of the carpeting (preparation-installation) process nonconformities.

  17. Integration of value stream map and strategic layout planning into DMAIC approach to improve carpeting process

    Directory of Open Access Journals (Sweden)

    Ayman Nagi

    2017-04-01

    Full Text Available Purpose: This paper presents an implementation of the Six Sigma DMAIC approach implementing lean tools and facilities layout techniques to reduce the occurrence of different types of nonconformities in the carpeting process. Such carpeting process can be found in several industries such as construction, aviation, and automotive. Design/methodology/approach: The improvement process was built through a sequential implementation of appropriate interconnected tools at each phase of the DMAIC approach. Utilized tools included: Pareto analysis, control charts, Ishikawa chart, 5-whys, failure mode and effect analysis, process capability ratio, value stream mapping, and strategic layout planning. Findings: The carpeting process capability, quality of the product, customer satisfaction, and cost of poor quality were significantly improved. Explicitly, the sigma level was improved from 2.297 to 2.886 and the defects per million opportunities (DPMO was reduced from 21615 to 3905. Originality/value: This paper has approved the capability of the Six Sigma DMAIC approach to analyze, investigate, and remove the root causes of the carpeting (preparation-installation process nonconformities .

  18. Integration of value stream map and strategic layout planning into DMAIC approach to improve carpeting process

    International Nuclear Information System (INIS)

    Nagi, A.; Altarazi, S.

    2017-01-01

    This paper presents an implementation of the Six Sigma DMAIC approach implementing lean tools and facilities layout techniques to reduce the occurrence of different types of nonconformities in the carpeting process. Such carpeting process can be found in several industries such as construction, aviation, and automotive. Design/methodology/approach: The improvement process was built through a sequential implementation of appropriate interconnected tools at each phase of the DMAIC approach. Utilized tools included: Pareto analysis, control charts, Ishikawa chart, 5-whys, failure mode and effect analysis, process capability ratio, value stream mapping, and strategic layout planning. Findings: The carpeting process capability, quality of the product, customer satisfaction, and cost of poor quality were significantly improved. Explicitly, the sigma level was improved from 2.297 to 2.886 and the defects per million opportunities (DPMO) was reduced from 21615 to 3905. Originality/value: This paper has approved the capability of the Six Sigma DMAIC approach to analyze, investigate, and remove the root causes of the carpeting (preparation-installation) process nonconformities.

  19. Association between product quality control and process quality control of bulk milk

    NARCIS (Netherlands)

    Velthuis, A.; Asseldonk, van M.A.P.M.

    2010-01-01

    Assessment of dairy-milk quality is based on product quality control (testing bulk-milk samples) and process quality control (auditing dairy farms). It is unknown whether process control improves product quality. To quantify possible association between product control and process control a

  20. [Methodology for an appreciative, dynamic and collaborative process: 3rd Canary Islands (Spain) Health Plan].

    Science.gov (United States)

    O'Shanahan Juan, José Joaquín; Hernández Rodríguez, Miguel Ángel; Del Otero Sanz, Laura; Henríquez Suárez, José Andrés; Mahtani Chugani, Vinita

    The need for new approaches to strategic planning by incorporating the perspectives of professionals and inhabitants has led to a new model for the 3rd Canary Islands (Spain) Health Plan (IIIPSC). A dual-phase participatory process using qualitative techniques is proposed: 1) local phase: a quantitative and qualitative study based on training and a research-action-participation initiative; and 2) insular phase: health conferences with face-to-face discussion of results in each health area (island) and proposals for action. The process prioritises problems and establishes a specific action plan for each island through initiatives that are considered to be viable, grouped by themes and weighted according to the potential impact on priority problems. This process of interaction may help to guide planning model changes and health policy decision-making, and was included in the IIIPSC Project for its parliamentary procedure. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  1. Process and apparatus for controlling control rods

    International Nuclear Information System (INIS)

    Gebelin, B.; Couture, R.

    1987-01-01

    This process and apparatus is characterized by 2 methods, for examination of cluster of nuclear control rods. Foucault current analyzer which examines fraction by fraction all the control rods. This examination is made by rotation of the cluster. Doubtful rods are then analysed by ultrasonic probe [fr

  2. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  3. Third Dutch Process Security Control Event

    NARCIS (Netherlands)

    Luiijf, H.A.M.

    2009-01-01

    On June 4th, 2009, the third Dutch Process Control Security Event took place in Amsterdam. The event, organised by the Dutch National Infrastructure against Cybercrime (NICC), attracted both Dutch process control experts and members of the European SCADA and Control Systems Information Exchange

  4. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  5. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  6. Control measurement system in purex process

    International Nuclear Information System (INIS)

    Mani, V.V.S.

    1985-01-01

    The dependence of a bulk facility handling Purex Process on the control measurement system for evaluating the process performance needs hardly be emphasized. process control, Plant control, inventory control and quality control are the four components of the control measurement system. The scope and requirements of each component are different and the measurement methods are selected accordingly. However, each measurement system has six important elements. These are described in detail. The quality assurance programme carried out by the laboratory as a mechanism through which the quality of measurements is regularly tested and stated in quantitative terms is also explained in terms of internal and external quality assurance, with examples. Suggestions for making the control measurement system more responsive to the operational needs in future are also briefly discussed. (author)

  7. TRIANA. A control strategy for Smart Grids. Forecasting, planning and real-time control

    International Nuclear Information System (INIS)

    Bakker, V.

    2012-01-01

    Increasing demand, extra fluctuation and a large share of distributed electricity generation will put more stress on the electricity supply chain. Therefore, changes are required in the supply chain to maintain a properly functioning, stable and affordable grid. Currently the supply chain is completely driven by demand by constantly adapting the production to the demand. The exploitation of flexibility on the demand side of the supply chain allows for a more efficient and sustainable electricity production. Techniques like controllable distributed generation, distributed storage, and smart appliances can introduce this required flexibility. To exploit the new flexibility, the grid has to become more intelligent, i.e. become a Smart Grid. In this thesis TRIANA, a three step control strategy for the Smart Grid is presented. In the first step of TRIANA, the forecasting step, the scheduling freedom (flexibility) of a device is determined for each individual device by a local controller. In the second step, a (central) planner tries to exploit the freedom of the devices determined in the first step for his objective. The last step of TRIANA is the real-time control step performed by the local controller achieving the planning in the best possible way. In order to analyze the impact of control methodologies for Smart Grid, a simulator based on an energy model has been built. The basic elements of the model are individual devices and between devices energy streams are defined. The energy streams are connected via so called pools, which represent the physical connections between the devices. To study the effectiveness of the control methodology and study the most economic use of the flexibility of devices, multiple scenarios have been simulated. Simulations show that TRIANA can optimize the energy flows and can control the operation of the domestic devices in an economic manner without discomfort for the residents. TRIANA is a methodology capable of adjusting the energy

  8. The management process, management information and control systems, and cybernetics

    Science.gov (United States)

    Zannetos, Z. S.; Wilcox, J. W.

    1972-01-01

    An attempt has been made to analyze the strengths and weaknesses of the cybernetics approach as applied to management. The conclusion is that cybernetics can serve not only as a conceptual philosophical aid, but also as an operational tool in both managerial planning and control. So far, however, most of its promise is yet unrealized; especially in the planning sphere. Only in the area of control of operations has the impact of this promising field shown tangible results.

  9. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  10. Deficits in motor control processes involved in the production of graphomotor movements in children with Attention-Deficit Hyperactivity Disorder

    NARCIS (Netherlands)

    Schoemaker, MM; Ketelaars, Cornelis; van Zonneveld, M; Minderaa, RB; Mulder, T

    This study aimed to investigate whether two distinct motor control processes, i.e. motor planning and parameter setting, were impaired in children with attention-deficit-hyperactivity disorder (ADHD). An experiment was designed in which children copied figures of increasing complexity under

  11. The Operational Planning Model of Transhipment Processes in the Port

    Directory of Open Access Journals (Sweden)

    Mia Jurjević

    2016-04-01

    Full Text Available Modelling of a traffic system refers to the efficiency of operations for establishing successful business performance by examining the possibilities for its improvement. The main purpose of each container terminal is to ensure continuity and dynamics of the flow of containers. The objective of this paper is to present a method for determining the amount of certain types of containers that can be transhipped at each berth, with the proper cargo handling, taking into account minimum total costs of transhipment. The mathematical model of planning the transhipment and transportation of containers at the terminal is presented. The optimal solution, obtained with the method of linear programming, represents a plan for container deployment that will ensure effective ongoing process of transhipment, providing the lowest transhipment costs. The proposed model, tested in the port of Rijeka, should be the basis for makingadequate business decisions in the operational planning of the container terminal.

  12. Mathematical Modeling and a Hybrid NSGA-II Algorithm for Process Planning Problem Considering Machining Cost and Carbon Emission

    Directory of Open Access Journals (Sweden)

    Jin Huang

    2017-09-01

    Full Text Available Process planning is an important function in a manufacturing system; it specifies the manufacturing requirements and details for the shop floor to convert a part from raw material to the finished form. However, considering only economical criterion with technological constraints is not enough in sustainable manufacturing practice; formerly, criteria about low carbon emission awareness have seldom been taken into account in process planning optimization. In this paper, a mathematical model that considers both machining costs reduction as well as carbon emission reduction is established for the process planning problem. However, due to various flexibilities together with complex precedence constraints between operations, the process planning problem is a non-deterministic polynomial-time (NP hard problem. Aiming at the distinctive feature of the multi-objectives process planning optimization, we then developed a hybrid non-dominated sorting genetic algorithm (NSGA-II to tackle this problem. A local search method that considers both the total cost criterion and the carbon emission criterion are introduced into the proposed algorithm to avoid being trapped into local optima. Moreover, the technique for order preference by similarity to an ideal solution (TOPSIS method is also adopted to determine the best solution from the Pareto front. Experiments have been conducted using Kim’s benchmark. Computational results show that process plan schemes with low carbon emission can be captured, and, more importantly, the proposed hybrid NSGA-II algorithm can obtain more promising optimal Pareto front than the plain NSGA-II algorithm. Meanwhile, according to the computational results of Kim’s benchmark, we find that both of the total machining cost and carbon emission are roughly proportional to the number of operations, and a process plan with less operation may be more satisfactory. This study will draw references for the further research on green

  13. Acceptable standard format and content for the fundamental nuclear material control (FNMC) plan required for low-enriched uranium facilities. Revision 2

    International Nuclear Information System (INIS)

    Joy, D.R.

    1995-12-01

    This report documents a standard format suggested by the NRC for use in preparing fundamental nuclear material control (FNMC) plans as required by the Low Enriched Uranium Reform Amendments (10CFR 74.31). This report also describes the necessary contents of a comprehensive plan and provides example acceptance criteria which are intended to communicate acceptable means of achieving the performance capabilities of the Reform Amendments. By using the suggested format, the licensee or applicant will minimize administrative problems associated with the submittal, review and approval of the FNMC plan. Preparation of the plan in accordance with this format Will assist the NRC in evaluating the plan and in standardizing the review and licensing process. However, conformance with this guidance is not required by the NRC. A license applicant who employs a format that provides a equal level of completeness and detail may use their own format. This document is also intended for providing guidance to licensees when making revisions to their FNMC plan

  14. Robust control charts in statistical process control

    NARCIS (Netherlands)

    Nazir, H.Z.

    2014-01-01

    The presence of outliers and contaminations in the output of the process highly affects the performance of the design structures of commonly used control charts and hence makes them of less practical use. One of the solutions to deal with this problem is to use control charts which are robust

  15. A National Residue Control Plan from the analytical perspective-The Brazilian case

    International Nuclear Information System (INIS)

    Mauricio, Angelo de Q; Lins, Erick S.; Alvarenga, Marcelo B.

    2009-01-01

    Food safety is a strategic topic entailing not only national public health aspects but also competitiveness in international trade. An important component of any food safety program is the control and monitoring of residues posed by certain substances involved in food production. In turn, a National Residue Control Plan (NRCP) relies on an appropriate laboratory network, not only to generate analytical results, but also more broadly to verify and co-validate the controls built along the food production chain. Therefore laboratories operating under a NRCP should work in close cooperation with inspection bodies, fostering the critical alignment of the whole system with the principles of risk analysis. Beyond producing technically valid results, these laboratories should arguably be able to assist in the prediction and establishment of targets for official control. In pursuit of analytical excellence, the Brazilian government has developed a strategic plan for Official Agricultural Laboratories. Inserted in a national agenda for agricultural risk analysis, the plan has succeeded in raising laboratory budget by approximately 200%, it has started a rigorous program for personnel capacity-building, it has initiated strategic cooperation with international reference centres, and finally, it has completely renewed instrumental resources and rapidly triggered a program aimed at full laboratory compliance with ISO/IEC 17025 requirements

  16. A National Residue Control Plan from the analytical perspective--the Brazilian case.

    Science.gov (United States)

    Mauricio, Angelo de Q; Lins, Erick S; Alvarenga, Marcelo B

    2009-04-01

    Food safety is a strategic topic entailing not only national public health aspects but also competitiveness in international trade. An important component of any food safety program is the control and monitoring of residues posed by certain substances involved in food production. In turn, a National Residue Control Plan (NRCP) relies on an appropriate laboratory network, not only to generate analytical results, but also more broadly to verify and co-validate the controls built along the food production chain. Therefore laboratories operating under a NRCP should work in close cooperation with inspection bodies, fostering the critical alignment of the whole system with the principles of risk analysis. Beyond producing technically valid results, these laboratories should arguably be able to assist in the prediction and establishment of targets for official control. In pursuit of analytical excellence, the Brazilian government has developed a strategic plan for Official Agricultural Laboratories. Inserted in a national agenda for agricultural risk analysis, the plan has succeeded in raising laboratory budget by approximately 200%, it has started a rigorous program for personnel capacity-building, it has initiated strategic cooperation with international reference centres, and finally, it has completely renewed instrumental resources and rapidly triggered a program aimed at full laboratory compliance with ISO/IEC 17025 requirements.

  17. A National Residue Control Plan from the analytical perspective-The Brazilian case

    Energy Technology Data Exchange (ETDEWEB)

    Mauricio, Angelo de Q [Ministry of Agriculture, Livestock and Food Supply of Brazil, Esplanada dos Ministerios, Bloco D, Annex B, Room 436, Zip code 70043-900, Brasilia, DF (Brazil)], E-mail: angelo.mauricio@agricultura.gov.br; Lins, Erick S.; Alvarenga, Marcelo B. [Ministry of Agriculture, Livestock and Food Supply of Brazil, Esplanada dos Ministerios, Bloco D, Annex B, Room 436, Zip code 70043-900, Brasilia, DF (Brazil)

    2009-04-01

    Food safety is a strategic topic entailing not only national public health aspects but also competitiveness in international trade. An important component of any food safety program is the control and monitoring of residues posed by certain substances involved in food production. In turn, a National Residue Control Plan (NRCP) relies on an appropriate laboratory network, not only to generate analytical results, but also more broadly to verify and co-validate the controls built along the food production chain. Therefore laboratories operating under a NRCP should work in close cooperation with inspection bodies, fostering the critical alignment of the whole system with the principles of risk analysis. Beyond producing technically valid results, these laboratories should arguably be able to assist in the prediction and establishment of targets for official control. In pursuit of analytical excellence, the Brazilian government has developed a strategic plan for Official Agricultural Laboratories. Inserted in a national agenda for agricultural risk analysis, the plan has succeeded in raising laboratory budget by approximately 200%, it has started a rigorous program for personnel capacity-building, it has initiated strategic cooperation with international reference centres, and finally, it has completely renewed instrumental resources and rapidly triggered a program aimed at full laboratory compliance with ISO/IEC 17025 requirements.

  18. Multi-assortment rhythmic production planning and control

    Science.gov (United States)

    Skolud, B.; Krenczyk, D.; Zemczak, M.

    2015-11-01

    A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented.

  19. Proceedings - Limits of Acceptable Change and related planning processes: Progress and future directions

    Science.gov (United States)

    Stephen F. McCool; David N. Cole

    1997-01-01

    Experience with Limits of Acceptable Change (LAC) and related planning processes has accumulated since the mid-1980's. These processes were developoed as a means of dealing with recreation carrying capacity issues in wilderness and National Parks. These processes clearly also have application outside of protected areas and to issues other than recreation...

  20. Gaussian Processes for Data-Efficient Learning in Robotics and Control.

    Science.gov (United States)

    Deisenroth, Marc Peter; Fox, Dieter; Rasmussen, Carl Edward

    2015-02-01

    Autonomous learning has been a promising direction in control and robotics for more than a decade since data-driven learning allows to reduce the amount of engineering knowledge, which is otherwise required. However, autonomous reinforcement learning (RL) approaches typically require many interactions with the system to learn controllers, which is a practical limitation in real systems, such as robots, where many interactions can be impractical and time consuming. To address this problem, current learning approaches typically require task-specific knowledge in form of expert demonstrations, realistic simulators, pre-shaped policies, or specific knowledge about the underlying dynamics. In this paper, we follow a different approach and speed up learning by extracting more information from data. In particular, we learn a probabilistic, non-parametric Gaussian process transition model of the system. By explicitly incorporating model uncertainty into long-term planning and controller learning our approach reduces the effects of model errors, a key problem in model-based learning. Compared to state-of-the art RL our model-based policy search method achieves an unprecedented speed of learning. We demonstrate its applicability to autonomous learning in real robot and control tasks.