WorldWideScience

Sample records for procedure review project

  1. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  2. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  3. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  4. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  5. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  6. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  7. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    International Nuclear Information System (INIS)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year

  8. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year.

  9. Development of critical digital review procedure

    International Nuclear Information System (INIS)

    Huang Huiwen; Liao Benching; Tseng Maosheng; Chung Hsianghan; Cheng Tsungchieh; Chen Minghuei

    2011-01-01

    This paper describes the critical digital review (CDR) procedure, which was developed by Institute of Nuclear Energy Research (INER), and sponsored by Taiwan Power Company (TPC). A preliminary CDR application experience which was performed by INER, is also described in this paper. Currently, CDR becomes one of the policies for digital Instrumentation and Control (I and C) system replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The 'CDR Review Items' chapter proposes optional review items, including the comparison of the design change, Software Verification and Validation (SV and V), Failure Mode and Effects Analysis (FMEA), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, HFE Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. Since CDR has become a TPC policy, Chin Shan Nuclear Power Plant (NPP) performed the CDR practice of Automatic Voltage Regulator (AVR) digital I and C replacement, even though the project had been on the half way. The major review items of this CDR were: the comparison of the design change, SV and V, FMEA, Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/ Component, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. The experience of the CDR showed the importance of preparation of the documents by the vendor. This means the communication with the vendors for the bid preparation is crucial. (author)

  10. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  11. Data publication - policies and procedures from the PREPARDE project

    Science.gov (United States)

    Callaghan, Sarah; Murphy, Fiona; Tedds, Jonathan; Kunze, John; Lawrence, Rebecca; Mayernik, , Matthew S.; Whyte, Angus; Roberts, Timothy

    2013-04-01

    Data are widely acknowledged as a first class scientific output. Increases in researchers' abilities to create data need to be matched by corresponding infrastructures for them to manage and share their data. At the same time, the quality and persistence of the datasets need to be ensured, providing the dataset creators with the recognition they deserve for their efforts. Formal publication of data takes advantage of the processes and procedures already in place to publish academic articles about scientific results, enabling data to be reviewed and more broadly disseminated. Data are vastly more varied in format than papers, and so the policies required to manage and publish data must take into account the complexities associated with different data types, scientific fields, licensing rules etc. The Peer REview for Publication & Accreditation of Research Data in the Earth sciences (PREPARDE) project is JISC- and NERC-funded, and aims to investigate the policies and procedures required for the formal publication of research data. The project is investigating the whole workflow of data publication, from ingestion into a data repository, through to formal publication in a data journal. To limit the scope of the project, the focus is primarily on the policies required for the Royal Meteorological Society and Wiley's Geoscience Data Journal, though members of the project team include representatives from the life sciences (F1000Research), and will generalise the policies to other disciplines. PREPARDE addresses key issues arising in the data publication paradigm, such as: what criteria are needed for a repository to be considered objectively trustworthy; how does one peer-review a dataset; and how can datasets and journal publications be effectively cross-linked for the benefit of the wider research community and the completeness of the scientific record? To answer these questions, the project is hosting workshops addressing these issues, with interactions from key

  12. 76 FR 50813 - Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures

    Science.gov (United States)

    2011-08-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures AGENCY: Federal Transit Administration (FTA... Administration (FTA) to publish policy guidance on the New and Small Starts capital project review and evaluation...

  13. Development of QC Procedures for Ocean Data Obtained by National Research Projects of Korea

    Science.gov (United States)

    Kim, S. D.; Park, H. M.

    2017-12-01

    To establish data management system for ocean data obtained by national research projects of Ministry of Oceans and Fisheries of Korea, KIOST conducted standardization and development of QC procedures. After reviewing and analyzing the existing international and domestic ocean-data standards and QC procedures, the draft version of standards and QC procedures were prepared. The proposed standards and QC procedures were reviewed and revised by experts in the field of oceanography and academic societies several times. A technical report on the standards of 25 data items and 12 QC procedures for physical, chemical, biological and geological data items. The QC procedure for temperature and salinity data was set up by referring the manuals published by GTSPP, ARGO and IOOS QARTOD. It consists of 16 QC tests applicable for vertical profile data and time series data obtained in real-time mode and delay mode. Three regional range tests to inspect annual, seasonal and monthly variations were included in the procedure. Three programs were developed to calculate and provide upper limit and lower limit of temperature and salinity at depth from 0 to 1550m. TS data of World Ocean Database, ARGO, GTSPP and in-house data of KIOST were analysed statistically to calculate regional limit of Northwest Pacific area. Based on statistical analysis, the programs calculate regional ranges using mean and standard deviation at 3 kind of grid systems (3° grid, 1° grid and 0.5° grid) and provide recommendation. The QC procedures for 12 data items were set up during 1st phase of national program for data management (2012-2015) and are being applied to national research projects practically at 2nd phase (2016-2019). The QC procedures will be revised by reviewing the result of QC application when the 2nd phase of data management programs is completed.

  14. 28 CFR 34.102 - Peer review procedures.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Peer review procedures. 34.102 Section 34.102 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.102 Peer review procedures. The OJJDP peer review process is contained in an OJJDP “Peer...

  15. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  16. Policy and procedures for classification of Class III groundwater at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters

  17. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    Science.gov (United States)

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  18. Procedure and apparatus for back projection

    International Nuclear Information System (INIS)

    1977-01-01

    (1) The procedure is for back projection in the form of a tomographic picture of a member, characterised in that the strip pictures are written onto the signal plate by a conversion pick-up unit; and that to the address inputs of the pick-up unit voltages are applied that represent a rotating coordinate system. (2) Procedure following claim 1 characterised by the fact that the voltages are respectively applied as sawtooth waveform horizontal and vertical television deflections. (3) Procedure following claims 1 and 2, characterised that in order to correct the television deflection voltages for the effect of a fan shaped radiation beam, first one and then the other of the amplitudes is modulated. (G.C.)

  19. 23 CFR 668.215 - Programming and project procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Programming and project procedures. 668.215 Section 668.215 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS EMERGENCY RELIEF PROGRAM Procedures for Federal Agencies for Federal Roads § 668.215 Programming...

  20. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  1. Environmental procedures

    International Nuclear Information System (INIS)

    1992-01-01

    The European Bank has pledged in its Agreement to place environmental management at the forefront of its operations to promote sustainable economic development in central and eastern Europe. The Bank's environmental policy is set out in the document titled, Environmental Management: The Bank's Policy Approach. This document, Environmental Procedures, presents the procedures which the European Bank has adopted to implement this policy approach with respect to its operations. The environmental procedures aim to: ensure that throughout the project approval process, those in positions of responsibility for approving projects are aware of the environmental implications of the project, and can take these into account when making decisions; avoid potential liabilities that could undermine the success of a project for its sponsors and the Bank; ensure that environmental costs are estimated along with other costs and liabilities; and identify opportunities for environmental enhancement associated with projects. The review of environmental aspects of projects is conducted by many Bank staff members throughout the project's life. This document defines the responsibilities of the people and groups involved in implementing the environmental procedures. Annexes contain Environmental Management: The Bank's Policy Approach, examples of environmental documentation for the project file and other ancillary information

  2. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  3. Space Geodesy Project Information and Configuration Management Procedure

    Science.gov (United States)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  4. An incremental procedure model for e-learning projects at universities

    Directory of Open Access Journals (Sweden)

    Pahlke, Friedrich

    2006-11-01

    Full Text Available E-learning projects at universities are produced under different conditions than in industry. The main characteristic of many university projects is that these are realized quasi in a solo effort. In contrast, in private industry the different, interdisciplinary skills that are necessary for the development of e-learning are typically supplied by a multimedia agency.A specific procedure tailored for the use at universities is therefore required to facilitate mastering the amount and complexity of the tasks.In this paper an incremental procedure model is presented, which describes the proceeding in every phase of the project. It allows a high degree of flexibility and emphasizes the didactical concept – instead of the technical implementation. In the second part, we illustrate the practical use of the theoretical procedure model based on the project “Online training in Genetic Epidemiology”.

  5. 42 CFR 405.1834 - CMS reviewing official procedure.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false CMS reviewing official procedure. 405.1834 Section... Determinations and Appeals § 405.1834 CMS reviewing official procedure. (a) Scope. A provider that is a party to... Administrator by a designated CMS reviewing official who considers whether the decision of the intermediary...

  6. 22 CFR 61.7 - Review and appeal procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Review and appeal procedures. 61.7 Section 61.7 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES WORLD-WIDE FREE FLOW OF AUDIO-VISUAL MATERIALS § 61.7 Review and appeal procedures. (a) An applicant may request a formal review of any adverse...

  7. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  8. 33 CFR 51.9 - Discharge review procedures.

    Science.gov (United States)

    2010-07-01

    ... GUARD DISCHARGE REVIEW BOARD § 51.9 Discharge review procedures. (a) Preliminary. Prior to a review... that reasonable bounds of relevancy and materiality are adhered to in the taking of evidence. (3) An...

  9. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  10. 23 CFR 630.1012 - Project-level procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project-level procedures. 630.1012 Section 630.1012 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... agencies/operators, transit providers, freight movers, utility suppliers, police, fire, emergency medical...

  11. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M.; Brown, W.S. [Brookhaven National Lab., Upton, NY (United States); Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J. [Carlow International Inc., Falls Church, VA (United States)

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator`s overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use.

  12. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Brown, W.S.; Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use

  13. Laparoscopic Whipple procedure: review of the literature.

    Science.gov (United States)

    Gagner, Michel; Palermo, Mariano

    2009-01-01

    Laparoscopic pancreatic surgery represents one of the most advanced applications for laparoscopic surgery currently in use. In the past, minimally invasive techniques were only used for diagnostic laparoscopy, staging of pancreatic cancer, and palliative procedures for unresectable pancreatic cancer. With new advances in technology and instrumentation, some sophisticated procedures are currently available, such as the Whipple procedure, one of the most sophisticated applications of minimally invasive surgery. A review of the literature shows that 146 laparoscopic Whipple procedures have been published worldwide since 1994. The authors analyzed blood loss, mean operating time, hospital stay, conversion rate, mean age, mortality rate, lymph nodes in the pathologic findings, follow up, and complications. Mean age was 59.1 years; mean operating time was 439 min. The average blood loss for the reviewed literature was 143 mL; median hospital stay was 18 days; conversion rate was 46%; number of lymph nodes in the pathologic findings was 19; and mortalities related to the procedure was low, 2 patients (1.3%) and the complication rate was 16% (23/46 patients). Complications included 2 hemorrhages, 4 bowel obstructions, 1 stress ulcer, 1 delay of gastric emptying, 4 pneumonias, and 11 leaks. This review demonstrates that the laparoscopic Whipple procedure is not only feasible but also safe, with low mortality and acceptable rates of complications.

  14. 29 CFR 801.69 - Procedures for initiating review.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Procedures for initiating review. 801.69 Section 801.69 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR OTHER LAWS... Vacation of Decision and Order of Administrative Law Judge § 801.69 Procedures for initiating review. (a...

  15. 18 CFR 801.4 - Project review.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...

  16. Regional-interstate site-review procedure: low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    1983-09-01

    The attributes of the Southern States Energy Board (SSEB) enable it to view federal/state interface problem areas from a perspective that can be uniquely constructive. The board is sensitive to the interests of both federal and state levels of government since it is composed of member states with common regional interests and confirmed by federal legislative action. It has been most effective when exercising a leadership role in finding procedures and practices that use the resources of both levels of government that are mutually supportive and nonduplicative. SSEB began an NRC-funded effort in that direction related to nuclear power plant siting in June 1975, entitled Regional-Interstate Nuclear Facility Siting Procedure Demonstration Project. SSEB approached the problem by working with interested states to analyze various elements of the licensing process, in particular with NEPA review procedures for interstate coordination where potential impacts extend beyond a single state and where the facility serves an interstate or regional need. SSEB also served as a catalyst in the development of a region-wide nuclear facility siting procedure that could improve the effectiveness and timeliness of the regulatory process

  17. The sustainable project management: A review and future possibilities

    Directory of Open Access Journals (Sweden)

    V.K. Chawla

    2018-06-01

    Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.

  18. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  19. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  20. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  1. Harmonization of internal dosimetry procedures in Latin America - ARCAL/IAEA project

    Energy Technology Data Exchange (ETDEWEB)

    Melo, D.; Dantas, B.M.; Juliao, L. [Instituto de Radioprotecao e Dosimetria - Av. Salvador Allende S/N, Recreio dos Bandeirantes, RJ 22780-160 (Brazil); Cruz Suarez, R. [International Atomic Energy Agency, Vienna (Austria); Rojo, A.; Serdero, N. [Autoridad Regulatoria Nuclear, Buenos Aires (Argentina); Videla, R. [Comision Chilena de Energia Nuclear, Santiago (Chile); Puerta, J.A. [Universidad Nacional de Colombia, Medellin (Colombia); Lopez, G. [Centro de Proteccion e Higiene de las Radiaciones, Ciudad de la Habana (Cuba); Alfaro, M.M. [Instituto nacional de Investigaciones Nucleares (Mexico); Gonzales, S. [Instituto Peruano de Energia Nuclear, Lima (Peru); Hermida, J.C. [Hospital de Clinicas, Montevideo (Uruguay); Navarro, T. [Centro de Investigaciones Energeticas, Mediciones Ambientales y Tecnologicas - CIEMAT, Madrid (Spain)

    2007-07-01

    Under the auspices of the Regional Coordination Agreement for Latin America, representatives of the eight member states have participated in a project to improve radiological protection for workers exposed to unsealed sources of radiation. The design of the project was based on information obtained from a questionnaire circulated among the participants, from which the initial status of internal dosimetry services in each country was characterised. The objective of the project is to harmonize internal dosimetry procedures, with reference to International Atomic Energy Agency recommendations. After the implementation of new procedures and personnel training, four intercomparison exercises were carried out: measurement of iodine in thyroid phantoms, measurement of gamma emitters in urine samples, measurement of beta emitters in urine samples and internal dose assessments. This project has resulted in important improvements in internal dosimetry services in the region. (authors)

  2. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  3. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  4. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    International Nuclear Information System (INIS)

    Little, C.A.; Berven, B.A.; Carter, T.E.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards

  5. Early Citability of Data vs Peer-Review like Data Publishing Procedures

    Science.gov (United States)

    Stockhause, Martina; Höck, Heinke; Toussaint, Frank; Lautenschlager, Michael

    2014-05-01

    The World Data Center for Climate (WDCC) hosted at the German Climate Computing Center (DKRZ) was one of the first data centers, which established a peer-review like data publication procedure resulting in DataCite DOIs. Data in the long-term archive (LTA) is diligently reviewed by data managers and data authors to grant high quality and widely reusability of the published data. This traditional data publication procedure for LTA data bearing DOIs is very time consuming especially for WDCC's high data volumes of climate model data in the order of multiple TBytes. Data is shared with project members and selected scientists months before the data is long-term archived. The scientific community analyses and thus reviews the data leading to data quality improvements. Scientists wish to cite these unstable data in scientific publications before the long-term archiving and the thorough data review process are finalized. A concept for early preprint DOIs for shared but not yet long-term archived data is presented. Requirements on data documentation, persistence and quality and use cases for preprint DOIs within the data life-cycle are discussed as well as questions of how to document the differences of the two DOI types and how to relate them to each other with the recommendation to use LTA DOIs in citations. WDCC wants to offer an additional user service for early citations of data of basic quality without compromising the LTA DOIs, i.e. WDCC's standard DOIs, as trustworthy indicator for high quality data. Referencing Links: World Data Center for Climate (WDCC): http://www.wdc-climate.de German Climate Computing Center (DKRZ): http://www.dkrz.de DataCite: http://datacite.org

  6. Use of the contingency matrix in the TRACK-MATCH procedure for two projections

    International Nuclear Information System (INIS)

    Baginyan, S.A.; Moroz, V.I.

    1985-01-01

    When analysing the work of geometrical reconstruction programs it is noted that if the TRACK-MATCH procedure is successful, it garantes the event measurement correctness. This serves as a base for application of the TRACK-MATCH procedure as a test for event mask measurements. Such use of the procedure does not require point-to-point correspondence between track images in different projections. It is sufficient to establish that the TRACK-MATCH procedure admits a solusion. It is shown that the problem of point-to-point correspondence between track images in different projections is reduced to conting matrix analysis. It is stated that if the determinant of the contingency matrix is not equal to zero it is sufficient for the TRACK-MATCH procedure to be solved

  7. Computer software review procedures

    International Nuclear Information System (INIS)

    Mauck, J.L.

    1993-01-01

    This article reviews the procedures which are used to review software written for computer based instrumentation and control functions in nuclear facilities. The utilization of computer based control systems is becoming much more prevalent in such installations, in addition to being retrofit into existing systems. Currently, the Nuclear Regulatory System uses Regulatory Guide 1.152, open-quotes Criteria for Programmable Digital Computer System Software in Safety-Related Systems of Nuclear Power Plantsclose quotes and ANSI/IEEE-ANS-7-4.3.2-1982, open-quotes Application Criteria for Programmable Digital Computer Systems in Safety Systems of Nuclear Power Generating Stationsclose quotes for guidance when performing reviews of digital systems. There is great concern about the process of verification and validation of these codes, so when inspections are done of such systems, inspectors examine very closely the processes which were followed in developing the codes, the errors which were detected, how they were found, and the analysis which went into tracing down the causes behind the errors to insure such errors were not propagated again in the future

  8. Procedures for initiation, cost-sharing and management of OECD projects in nuclear safety

    International Nuclear Information System (INIS)

    2002-01-01

    The OECD (CSNI) projects aim to produce results relevant for the safe operation of nuclear power plants through international collaborative projects. In general, the projects consist of advanced experimental programmes that are conducted at specialized facilities. At present, the following OECD (CSNI) projects are in operation: - The Halden Project, covering fuel/materials and I and C/Human Factors issues; - The Cabri Project, addressing reactivity transients on high burnup fuels; - The MASCA Project, which deals with in-vessel corium phenomena; - The OLHF Project, dealing with lower head failure mechanisms; - The SETH Project addressing thermal-hydraulics issues, started in 2001; - The MCCI Project on ex-vessel coolability and melt-concrete interaction. There are significant differences among these projects in terms of their motivation, size and scope. The Halden Project and the Cabri Water Loop Project are large undertakings where the host organisations assume full and direct responsibility for the project establishment and administration - as well as for the negotiation with relevant parties on the terms of participation. In the other cases, instead, the NEA secretariat has a more direct responsibility, conferred by the CSNI, in establishing the project technical and financial basis, as well as for its implementation and administration. The objective of this procedure is to provide a common basis for the establishment and management of the OECD projects in the area of nuclear safety. It is a follow-up of a recommendation expressed by the CSNI Bureau during its meeting in October 2001, where the procedures for the establishment and management of the OECD (CSNI) projects in nuclear safety were addressed. While this procedure attempts at defining general guidelines for project initiation, financing and management, one should bear in mind that each project has its own motivation, background and framework. Thus, some degree of flexibility in project structure

  9. Token Economy: A Systematic Review of Procedural Descriptions.

    Science.gov (United States)

    Ivy, Jonathan W; Meindl, James N; Overley, Eric; Robson, Kristen M

    2017-09-01

    The token economy is a well-established and widely used behavioral intervention. A token economy is comprised of six procedural components: the target response(s), a token that functions as a conditioned reinforcer, backup reinforcers, and three interconnected schedules of reinforcement. Despite decades of applied research, the extent to which the procedures of a token economy are described in complete and replicable detail has not been evaluated. Given the inherent complexity of a token economy, an analysis of the procedural descriptions may benefit future token economy research and practice. Articles published between 2000 and 2015 that included implementation of a token economy within an applied setting were identified and reviewed with a focus on evaluating the thoroughness of procedural descriptions. The results show that token economy components are regularly omitted or described in vague terms. Of the articles included in this analysis, only 19% (18 of 96 articles reviewed) included replicable and complete descriptions of all primary components. Missing or vague component descriptions could negatively affect future research or applied practice. Recommendations are provided to improve component descriptions.

  10. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  11. Managing Operating Procedures in Distributed Collaborative Projects

    Science.gov (United States)

    Hool, A.; Beuzelin Ollivier, M.-G.; Roubert, F.

    2013-04-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity - a field which has only been under investigation for a few years and is still lacking regulatory framework - highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  12. Managing Operating Procedures in Distributed Collaborative Projects

    International Nuclear Information System (INIS)

    Hool, A; Ollivier, M-G Beuzelin; Roubert, F

    2013-01-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity – a field which has only been under investigation for a few years and is still lacking regulatory framework – highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  13. European project for developing general guidelines for harmonising internal dose assessment procedures (IDEAS)

    International Nuclear Information System (INIS)

    Andrasi, A.; Bailey, M.; Puncher, M.; Berkovski, V.; Eric Blanchardon, E.; Jourdain, J.-R.; Carlo-Maria Castellani, C.-M.; Doerfel, H.; Christian Hurtgen, Ch.; Le Guen, B.

    2003-01-01

    Several international intercomparison exercises on intake and internal dose assessments from monitoring data led to the conclusion that the results calculated by different participants varied significantly mainly because of the wide variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated as an EU research project under the 5 th Framework Programme (2001-2005), with the aim of developing general guidelines for standardising assessments of intakes and internal doses. In the IDEAS project eight institutions from seven European countries are participating using inputs also from internal dosimetry professionals from across Europe to ensure broad consensus in the outcome of the project. The IDEAS project is explained

  14. Human Factors Evaluation of Procedures for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the results of human factors assessment on the plant operating procedures as part of Periodic Safety Review(PSR) of Yonggwang Nuclear Power Plant Unit no. 1, 2. The suitability of item and appropriateness of format and structure in the key operating procedures of nuclear power plants were investigated by the review of plant operating experiences and procedure documents, field survey, and experimental assessment on some part of procedures. A checklist was used to perform this assessment and record the review results. The reviewed procedures include EOP(Emergency Operating Procedures), GOP(General Operating Procedures), AOP(Abnormal Operating Procedures), and management procedures of some technical departments. As results of the assessments, any significant problem challenging the safety was not found on the human factors in the operating procedures. However, several small items to be changed and improved were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on the operating procedure.

  15. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Science.gov (United States)

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  16. Review on midurethral sling procedures for stress urinary incontinence

    Directory of Open Access Journals (Sweden)

    Nazura Bt Karim

    2015-05-01

    Full Text Available Minimally invasive suburethral slings, namely the retropubic suburethral sling or the tension-free vaginal tape (TVT, has become the mainstay for surgical management of moderate to severe stress urinary incontinence (SUI taking over the place of Burch's colposuspension after its introduction in the 1990s. Following the introduction of retropubic sling procedures are the transobturator (TVT-O procedures and the mini-sling procedures. This review attempts to summarize the current trend of midurethral sling (MUS procedures in the management of SUI.

  17. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  18. Applications of Desensitization Procedures for School-Related Problems; A Review.

    Science.gov (United States)

    Prout, H. Thompson; Harvey, John R.

    1978-01-01

    A variety of desensitization and counterconditioning procedures have been utilized to deal with school-related problems. These procedures are reviewed with respect to applications for treating school phobia, test anxiety, and other academic anxieties. (Author)

  19. Laboratory procedures used in the hot corrosion project

    International Nuclear Information System (INIS)

    Jeys, T.R.

    1980-01-01

    The objective of the Hot Corrosion Project in the LLNL Metals and Ceramics Division is to study the physical and chemical mechanisms of corrosion of nickel, iron, and some of their alloys when these metals are subjected to oxidizing or sulfidizing environments at temperatures between 850 and 950 0 C. To obtain meaningful data in this study, we must rigidly control many parameters. Parameters are discussed and the methods chosen to control them in this laboratory. Some of the mechanics and manipulative procedures that are specifically related to data access and repeatability are covered. The method of recording and processing the data from each experiment using an LS-11 minicomputer are described. The analytical procedures used to evaluate the specimens after the corrosion tests are enumerated and discussed

  20. 7 CFR 929.125 - Committee review procedures.

    Science.gov (United States)

    2010-01-01

    ... MASSACHUSETTS, RHODE ISLAND, CONNECTICUT, NEW JERSEY, WISCONSIN, MICHIGAN, MINNESOTA, OREGON, WASHINGTON, AND LONG ISLAND IN THE STATE OF NEW YORK Rules and Regulations § 929.125 Committee review procedures... Committee within 30 days after receipt of the Committee's determination of sales history, a request for a...

  1. A Review of Clinical Data for Currently Approved Hysteroscopic Sterilization Procedures

    Science.gov (United States)

    Basinski, Cindy M

    2010-01-01

    Two hysteroscopic permanent sterilization procedures are approved for use in the United States: Essure® Permanent Birth Control System (Conceptus Incorporated, Mountain View, CA) and Adiana® Permanent Contraception (Hologic, Inc., Bedford, MA). This review compares the clinical trial data for these procedures. A notable difference is the resultant clinical pregnancy risk. The clinical trials for the Essure procedure have reported no pregnancies in 643 relying women in the 9 years since initiation of the studies. The clinical trial for the Adiana procedure has reported 12 pregnancies in 570 relying women in nearly 5 years of collected data. Other clinical outcome parameters concerning Essure and Adiana are examined in this review. PMID:21364861

  2. Tooth-bleaching procedures and their controversial effects: A literature review

    Science.gov (United States)

    Alqahtani, Mohammed Q.

    2014-01-01

    Aim This review article will help clinicians improve their understanding of the history of bleaching procedures, bleaching types, components, mechanisms, and their effects on soft tissue, tooth structures, resin composite, and bonding. Methods The controversial issues about bleaching procedures and their effects are reviewed. Additionally, the consequences of pre- and post-bleaching on the bonding potential of composite resin restorations to tooth structure are discussed. Conclusion The overall goal of the paper is to help reduce risks for patients. PMID:25408594

  3. Reviewing the College Disciplinary Procedure. Mendip Papers.

    Science.gov (United States)

    Kedney, R. J.; Saunders, R.

    This paper provides practical advice on reviewing and designing disciplinary procedures and is set in the context of incorporation of further education and sixth form colleges in England. Reasons are provided for having disciplinary rules, based on the Advisory Conciliation and Arbitration Service's (ACAS) Code of Practice. Relevant English…

  4. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  5. Year 2000 TWRS Maintenance procedure review report

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K

  6. Year 2000 TWRS Maintenance procedure review report

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  7. Tight integration of computerized procedures with plant information at the South Texas Project

    International Nuclear Information System (INIS)

    Brtis, J.S.; Green, T.

    1996-01-01

    This paper describes a unique undertaking that is underway at Houston Lighting and Power's South Texas Project (STP). The paper presents an information upgrade project that uses expert system technologies to computerize design change procedures and to tightly integrate the resulting on-line, interactive procedures with the on-line information that design change activities use and generate. This effort will show how procedure computerization can leverage the large investments in plant data. The expected benefits include reduced costs and improved quality of design change work, plus a significant reduction in the burden of configuration management that comes from design changes. Both process computerization and the integration of process with data are being implemented at STP. This work is part of a major migration of information from a mainframe to a LAN platform. This paper will be of greatest interest to those involved in: (1) configuration management, (2) coordinating information to support design change procedures, (3) plant information management, and (4) business process reengineering

  8. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  9. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  10. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  11. Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects

    NARCIS (Netherlands)

    Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,

  12. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  13. Post-project market review as a tool for stimulating commercialisation of knowledge creation projects

    NARCIS (Netherlands)

    Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von

  14. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  15. Review of a Parent's Influence on Pediatric Procedural Distress and Recovery.

    Science.gov (United States)

    Brown, Erin A; De Young, Alexandra; Kimble, Roy; Kenardy, Justin

    2018-06-01

    Understanding how parents influence their child's medical procedures can inform future work to reduce pediatric procedural distress and improve recovery outcomes. Following a pediatric injury or illness diagnosis, the associated medical procedures can be potentially traumatic events that are often painful and distressing and can lead to the child experiencing long-term physical and psychological problems. Children under 6 years old are particularly at risk of illness or injury, yet their pain-related distress during medical procedures is often difficult to manage because of their young developmental level. Parents can also experience ongoing psychological distress following a child's injury or illness diagnosis. The parent and parenting behavior is one of many risk factors for increased pediatric procedural distress. The impact of parents on pediatric procedural distress is an important yet not well-understood phenomenon. There is some evidence to indicate parents influence their child through their own psychological distress and through parenting behavior. This paper has three purposes: (1) review current empirical research on parent-related risk factors for distressing pediatric medical procedures, and longer-term recovery outcomes; (2) consider and develop existing theories to present a new model for understanding the parent-child distress relationship during medical procedures; and (3) review and make recommendations regarding current assessment tools and developing parenting behavior interventions for reducing pediatric procedural distress.

  16. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  17. REVIEW Of COMPUTERIZED PROCEDURE GUIDELINES FOR NUCLEAR POWER PLANT CONTROL ROOMS

    Energy Technology Data Exchange (ETDEWEB)

    David I Gertman; Katya Le Blanc; Ronald L Boring

    2011-09-01

    Computerized procedures (CPs) are recognized as an emerging alternative to paper-based procedures for supporting control room operators in nuclear power plants undergoing life extension and in the concept of operations for advanced reactor designs. CPs potentially reduce operator workload, yield increases in efficiency, and provide for greater resilience. Yet, CPs may also adversely impact human and plant performance if not designed and implemented properly. Therefore, it is important to ensure that existing guidance is sufficient to provide for proper implementation and monitoring of CPs. In this paper, human performance issues were identified based on a review of the behavioral science literature, research on computerized procedures in nuclear and other industries, and a review of industry experience with CPs. The review of human performance issues led to the identification of a number of technical gaps in available guidance sources. To address some of the gaps, we developed 13 supplemental guidelines to support design and safety. This paper presents these guidelines and the case for further research.

  18. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  19. 34 CFR 303.342 - Procedures for IFSP development, review, and evaluation.

    Science.gov (United States)

    2010-07-01

    ... development, review, and evaluation. (a) Meeting to develop initial IFSP—timelines. For a child who has been... process. Therefore, it is necessary to have only one separate periodic review each year (i.e., six months... 34 Education 2 2010-07-01 2010-07-01 false Procedures for IFSP development, review, and evaluation...

  20. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  1. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  2. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Researches on R and D of management procedures; 1980 nendo kenkyu kaihatsu kanri shuho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    The strategic system planning procedures have been developed and applied for drafting R and D targets and subsequent medium-term plans, in order to help promote the Sunshine Project smoothly, based on the long-term prospects. This project compares the developed procedures with the current promotion systems and R and D management supporting procedures, to establish the strategic system planning procedures. These newly developed procedures are expected to accelerate the Sunshine Project, when applied in the standard manner. They are also partly applied to coal liquefaction techniques for (system demand analysis), the results of which are used to propose the ideal R and D targets of these techniques. The milestone planning procedures are preliminary applied to (establishing the project plans), to draw systematic long-, medium- and short-term plans. The preliminary application of these prediction/analysis and supporting procedures has verified effectiveness of the strategic system planning procedures. (NEDO)

  3. Radiochemical procedures

    International Nuclear Information System (INIS)

    Lyon, W.S.

    1982-01-01

    The modern counting instrumentation has largely obviated the need for separation processes in the radiochemical analysis but problems in low-level radioactivity measurement, environmental-type analyses, and special situations caused in the last years a renaissance of the need for separation techniques. Most of the radiochemical procedures, based on the classic works of the Manhattan Project chemists of the 1940's, were published in the National Nuclear Energy Series (NNES). Improvements such as new solvent extraction and ion exchange separations have been added to these methods throughout the years. Recently the Los Alamos Group have reissued their collected Radiochemical Procedures containing a short summary and review of basic inorganic chemistry - 'Chemistry of the Elements on the Basis of Electronic Configuration'. (A.L.)

  4. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  5. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  6. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  7. Aligning environmental and regulatory procedures with a holistic project management approach for residue deposits

    CSIR Research Space (South Africa)

    Snyman, BJ

    2006-01-01

    Full Text Available ). 1.1 Legislative responses in South Africa The advent of a democratic South Africa has brought about the promulgation of new environmental legislation. This was necessary to give legal effect to the principles of sustainability as laid down.... Often project delays can be ascribed to non-conformance to the legal and regulatory processes, because: • The South African EIA legislative process that is applicable to mine residue deposition does not focus on project management procedures, project...

  8. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  9. Procedural Pain: Systematic Review of Parent Experiences and Information Needs.

    Science.gov (United States)

    Gates, Allison; Shave, Kassi; Featherstone, Robin; Buckreus, Kelli; Ali, Samina; Scott, Shannon D; Hartling, Lisa

    2018-06-01

    Parents wish to reduce their child's pain during medical procedures but may not know how to do so. We systematically reviewed the literature on parents' experiences and information needs related to managing their child's pain for common medical procedures. Of 2678 records retrieved through database searching, 5 were included. Three additional records were identified by scanning reference lists. Five studies were qualitative, and 3 were quantitative. Most took place in North America or Europe (n = 7) and described neonatal intensive care unit experiences (n = 5). Procedures included needle-related medical procedures (eg, venipuncture, phlebotomy, intravenous insertion), sutures, and wound repair and treatment, among others. Generally, parents desired being present during procedures, wanted to remain stoic for their child, and thought that information would be empowering and relieve stress but felt unsupported in taking an active role. Supporting and educating parents may empower them to lessen pain for their children while undergoing medical procedures.

  10. Radiofrequency Procedures to Relieve Chronic Knee Pain: An Evidence-Based Narrative Review.

    Science.gov (United States)

    Bhatia, Anuj; Peng, Philip; Cohen, Steven P

    2016-01-01

    Chronic knee pain from osteoarthritis or following arthroplasty is a common problem. A number of publications have reported analgesic success of radiofrequency (RF) procedures on nerves innervating the knee, but interpretation is hampered by lack of clarity regarding indications, clinical protocols, targets, and longevity of benefit from RF procedures. We reviewed the following medical literature databases for publications on RF procedures on the knee joint for chronic pain: MEDLINE, EMBASE, Cochrane Central Register of Controlled Trials, Cochrane Database of Systematic Reviews, and Google Scholar up to August 9, 2015. Data on scores for pain, validated scores for measuring physical disability, and adverse effects measured at any timepoint after 1 month following the interventions were collected, analyzed, and reported in this narrative review. Thirteen publications on ablative or pulsed RF treatments of innervation of the knee joint were identified. A high success rate of these procedures in relieving chronic pain of the knee joint was reported at 1 to 12 months after the procedures, but only 2 of the publications were randomized controlled trials. There was evidence for improvement in function and a lack of serious adverse events of RF treatments. Radiofrequency treatments on the knee joint (major or periarticular nerve supply or intra-articular branches) have the potential to reduce pain from osteoarthritis or persistent postarthroplasty pain. Ongoing concerns regarding the quality, procedural aspects, and monitoring of outcomes in publications on this topic remain. Randomized controlled trials of high methodological quality are required to further elaborate role of these interventions in this population.

  11. Integrated System Validation Usability Questionnaire: Computerized Procedures

    International Nuclear Information System (INIS)

    Garcés, Ma. I.; Torralba, B.

    2015-01-01

    The Research and Development (R&D) project on “Theoretical and Methodological Approaches to Integrated System Validation of Control Rooms, 2014-2015”, in which the research activities described in this report are framed, has two main objectives: to develop the items for an usability methodology conceived as a part of the measurement framework for performance-based control room evaluation that the OECD Halden Reactor Project will test in the experiments planned for 2015; and the statistical analysis of the data generated in the experimental activities of the Halden Man-Machine Laboratory (HAMMLAB) facility, with previous usability questionnaires, in 2010 and 2011. In this report, the procedure designed to meet the first goal of the project is described, in particular, the process followed to identify the items related to operating procedures, both computer and paper-based, one of the elements to be included in the usability questionnaire. Three phases are performed, in the first one, the approaches developed by the United States Nuclear Regulatory Commission, NRC, are reviewed, the models used by the nuclear industry and their technical support organizations, mainly, the Electric Power Research Institute, EPRI, are analyzed, and scientist advances are also explored. In the remaining stages, general and specific guidelines for computerized and paper-based procedures are compared and criteria for the preliminary selection of the items that should be incorporated into the usability questionnaire are defined. This proposal will be reviewed and adapted by the Halden Reactor Project to the design of the specific experiments performed in HAMLAB.

  12. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  13. FDH radiological design review guidelines

    International Nuclear Information System (INIS)

    Millsap, W.J.

    1998-01-01

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information

  14. FDH radiological design review guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Millsap, W.J.

    1998-09-29

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information.

  15. A qualitative analysis of the determinants in the choice of a French journal reviewing procedures

    Science.gov (United States)

    Morge, Ludovic

    2015-12-01

    Between 1993 and 2010, two French journals (Aster and Didaskalia) coming from different backgrounds but belonging to the same institution used to publish papers on research in science and technology education. The merging of these journals made it necessary for them to compare the different reviewing procedures used by each. This merging occurred at a time when research is becoming increasingly international which partly determines some of the reviewing procedure choices. In order for a francophone international journal to survive, it needs to take this internationalization into account in a reasoned manner. The author of this article, as a chief editor of RDST (Recherches en Didactique des Sciences et des Technologies)—the journal resulting from the merging- taking part in this merger, analyses the social, cultural and pragmatic determinants which impacted the choices made in reviewing procedures. This paper describes how these diversity of factors leads us to drop the idea of a standard reviewing procedure which would be valid for all journals.

  16. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  17. Model checking as an aid to procedure design

    International Nuclear Information System (INIS)

    Zhang, Wenhu

    2001-01-01

    The OECD Halden Reactor Project has been actively working on computer assisted operating procedures for many years. The objective of the research has been to provide computerised assistance for procedure design, verification and validation, implementation and maintenance. For the verification purpose, the application of formal methods has been considered in several reports. The recent formal verification activity conducted at the Halden Project is based on using model checking to the verification of procedures. This report presents verification approaches based on different model checking techniques and tools for the formalization and verification of operating procedures. Possible problems and relative merits of the different approaches are discussed. A case study of one of the approaches is presented to show the practical application of formal verification. Application of formal verification in the traditional procedure design process can reduce the human resources involved in reviews and simulations, and hence reduce the cost of verification and validation. A discussion of the integration of the formal verification with the traditional procedure design process is given at the end of this report. (Author)

  18. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  19. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  20. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  1. 42 CFR 8.28 - Expedited procedures for review of immediate suspension.

    Science.gov (United States)

    2010-10-01

    ... GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for Review of Suspension or Proposed Revocation of OTP Certification, and of Adverse Action Regarding Withdrawal of Approval of an...

  2. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  3. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  4. Dissemination of Periodontal Pathogens in the Bloodstream after Periodontal Procedures: A Systematic Review

    Science.gov (United States)

    Horliana, Anna Carolina Ratto Tempestini; Chambrone, Leandro; Foz, Adriana Moura; Artese, Hilana Paula Carillo; Rabelo, Mariana de Sousa; Pannuti, Cláudio Mendes; Romito, Giuseppe Alexandre

    2014-01-01

    Background To date, there is no compilation of evidence-based information associating bacteremia and periodontal procedures. This systematic review aims to assess magnitude, duration, prevalence and nature of bacteremia caused by periodontal procedures. Study Design Systematic Review Types of Studies Reviewed MEDLINE, EMBASE and LILACS databases were searched in duplicate through August, 2013 without language restriction. Observational studies were included if blood samples were collected before, during or after periodontal procedures of patients with periodontitis. The methodological quality was assessed in duplicate using the modified Newcastle-Ottawa scale (NOS). Results Search strategy identified 509 potentially eligible articles and nine were included. Only four studies demonstrated high methodological quality, whereas five were of medium or low methodological quality. The study characteristics were considered too heterogeneous to conduct a meta-analysis. Among 219 analyzed patients, 106 (49.4%) had positive bacteremia. More frequent bacteria were S. viridans, A. actinomycetemcomitans P. gingivalis, M. micros and species Streptococcus and Actinomyces, although identification methods of microbiologic assays were different among studies. Clinical Implications Although half of the patients presented positive bacteremia after periodontal procedures, accurate results regarding the magnitude, duration and nature of bacteremia could not be confidentially assessed. PMID:24870125

  5. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  6. A Review of CAM for Procedural Pain in Infancy: Part II. Other Interventions

    Directory of Open Access Journals (Sweden)

    Jennie C. I. Tsao

    2008-01-01

    Full Text Available This article is the second in a two-part series reviewing the empirical evidence for complementary and alternative medicine (CAM approaches for the management of pain related to medical procedures in infants up to 6 weeks of age. Part I of this series investigated the effects of sucrose with or without non-nutritive sucking (NNS. The present article examines other CAM interventions for procedural pain including music-based interventions, olfactory stimulation, kangaroo care and swaddling. Computerized databases were searched for relevant studies including prior reviews and primary trials. Preliminary support was revealed for the analgesic effects of the CAM modalities reviewed. However, the overall quality of the evidence for these approaches remains relatively weak. Additional well-designed trials incorporating rigorous methodology are required. Such investigations will assist in the development of evidence-based guidelines on the use of CAM interventions either alone or in concert with conventional approaches to provide safe, reliable analgesia for infant procedural pain.

  7. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  8. Early site reviews for nuclear power facilities: procedures and possible technical review options. Draft

    International Nuclear Information System (INIS)

    1978-02-01

    The document provides guidance for utility companies, State and other governmental agencies, and others who may request or may wish to participate in an early review of site suitability issues related to a site proposed for a nuclear power or test reactor. Although the emphasis of this document is on a nuclear electric generating station, the guidance provided can be used for a test reactor or other kinds of reactors. The procedures to be followed by applicants for construction permits and by others are described and the possible significant areas of technical review are delineated

  9. Plastic surgery: quo vadis? Current trends and future projections of aesthetic plastic surgical procedures in the United States.

    Science.gov (United States)

    Broer, P Niclas; Levine, Steven M; Juran, Sabrina

    2014-03-01

    The objective of this article was to evaluate past and current trends regarding aesthetic operations in the United States and to project future changes regarding such procedures. Cosmetic surgery statistics from the American Society for Aesthetic Plastic Surgery from 1997 to 2012 were analyzed by sex, age, and ethnic group. Then, using population projections from the U.S. Census Bureau based on the 2010 census, two projection scenarios of the expected number of aesthetic plastic surgery procedures were generated. The scenarios included the presumed occurrence and nonoccurrence of a recession like that which occurred in 2007. Aesthetic procedures are expected to grow from 1,688,694 in 2012 to 3,847,929 by 2030, representing an average annual growth rate of 7.1 percent. Should another recession of similar degree to the one in 2007 occur, procedures would increase to only 2,086,994, displaying an average annual growth percentage rate of 1.3 percent. Because the age distribution of the patient population will change, preferences for specific procedures according to age influence-and thus are reflected in-future demand for those procedures. Furthermore, the ethnic profile of patients will change significantly, with 32 percent of all procedures being performed on patients other than Caucasians by 2030. Demand for aesthetic plastic surgical procedures is expected to continue to grow, while depending on the economic performance at the macro level and changing demographic dynamics of the U.S. population. Considering all investigated factors and trends among all patients, the most commonly requested procedures by 2030 are likely to be (1) breast augmentations, (2) lipoplasties, and (3) blepharoplasties.

  10. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  11. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  12. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  13. Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.

    Science.gov (United States)

    Taylor, James W.

    1999-01-01

    Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…

  14. The IMI PROTECT project: purpose, organizational structure, and procedures.

    Science.gov (United States)

    Reynolds, Robert F; Kurz, Xavier; de Groot, Mark C H; Schlienger, Raymond G; Grimaldi-Bensouda, Lamiae; Tcherny-Lessenot, Stephanie; Klungel, Olaf H

    2016-03-01

    The Pharmacoepidemiological Research on Outcomes of Therapeutics by a European ConsorTium (PROTECT) initiative was a collaborative European project that sought to address limitations of current methods in the field of pharmacoepidemiology and pharmacovigilance. Initiated in 2009 and ending in 2015, PROTECT was part of the Innovative Medicines Initiative, a joint undertaking by the European Union and pharmaceutical industry. Thirty-five partners including academics, regulators, small and medium enterprises, and European Federation of Pharmaceuticals Industries and Associations companies contributed to PROTECT. Two work packages within PROTECT implemented research examining the extent to which differences in the study design, methodology, and choice of data source can contribute to producing discrepant results from observational studies on drug safety. To evaluate the effect of these differences, the project applied different designs and analytic methodology for six drug-adverse event pairs across several electronic healthcare databases and registries. This papers introduces the organizational structure and procedures of PROTECT, including how drug-adverse event and data sources were selected, study design and analyses documents were developed, and results managed centrally. Copyright © 2016 John Wiley & Sons, Ltd.

  15. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  16. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  17. Validation procedures used in the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    The purpose of this report is (1) to document the data validation process developed for the Background Soil Characterization Project (BSCP); (2) to offer members of other project teams and potential data users the benefit of the experience gained in the BSCP in the area of developing project-specific data validation criteria and procedures based on best available guidance and technical information; and (3) to provide input and guidance to the efforts under way within Martin Marietta Energy Systems, Inc., to develop standard operating procedures to streamline and optimize the analytical laboratory data validation process for general use by making it more technically rigorous, consistent, and cost effective. Lessons learned from the BSCP are also provided to meet this end (Sect. 1.3)

  18. Parent experiences and information needs relating to procedural pain in children: a systematic review protocol.

    Science.gov (United States)

    Gates, Allison; Shave, Kassi; Featherstone, Robin; Buckreus, Kelli; Ali, Samina; Scott, Shannon; Hartling, Lisa

    2017-06-06

    There exist many evidence-based interventions available to manage procedural pain in children and neonates, yet they are severely underutilized. Parents play an important role in the management of their child's pain; however, many do not possess adequate knowledge of how to effectively do so. The purpose of the planned study is to systematically review and synthesize current knowledge of the experiences and information needs of parents with regard to the management of their child's pain and distress related to medical procedures in the emergency department. We will conduct a systematic review using rigorous methods and reporting based on the PRISMA statement. We will conduct a comprehensive search of literature published between 2000 and 2016 reporting on parents' experiences and information needs with regard to helping their child manage procedural pain and distress. Ovid MEDLINE, Ovid PsycINFO, CINAHL, and PubMed will be searched. We will also search reference lists of key studies and gray literature sources. Two reviewers will screen the articles following inclusion criteria defined a priori. One reviewer will then extract the data from each article following a data extraction form developed by the study team. The second reviewer will check the data extraction for accuracy and completeness. Any disagreements with regard to study inclusion or data extraction will be resolved via discussion. Data from qualitative studies will be summarized thematically, while those from quantitative studies will be summarized narratively. The second reviewer will confirm the overarching themes resulting from the qualitative and quantitative data syntheses. The Critical Appraisal Skills Programme Qualitative Research Checklist and the Quality Assessment Tool for Quantitative Studies will be used to assess the quality of the evidence from each included study. To our knowledge, no published review exists that comprehensively reports on the experiences and information needs of parents

  19. Review of Ruegen herring larvae survey project 2011

    NARCIS (Netherlands)

    Dickey-Collas, M.; Nash, R.D.M.

    2011-01-01

    At the request of the Johann Heinrich von Thünen Institut (vTI), IOR Rostock, a return review of the German Rügen herring larval survey (RHLS) project took place on the 24th to 26th January 2011, following on from a similar review in November 2006. Mark Dickey-Collas (Wageningen IMARES) and Richard

  20. Maximum entropy PDF projection: A review

    Science.gov (United States)

    Baggenstoss, Paul M.

    2017-06-01

    We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.

  1. The use of multimedia consent programs for surgical procedures: a systematic review.

    Science.gov (United States)

    Nehme, Jean; El-Khani, Ussamah; Chow, Andre; Hakky, Sherif; Ahmed, Ahmed R; Purkayastha, Sanjay

    2013-02-01

    To compare multimedia and standard consent, in respect to patient comprehension, anxiety, and satisfaction, for various surgical/interventional procedures. Electronic searches of PubMed, MEDLINE, Ovid, Embase, and Google Scholar were performed. Relevant articles were assessed by 2 independent reviewers. Comparative (randomized and nonrandomized control trials) studies of multimedia and standard consent for a variety of surgical/interventional procedures were included. Studies had to report on at least one of the outcome measures. Studies were reviewed by 2 independent investigators. The first investigator extracted all relevant data, and consensus of each extraction was performed by a second investigator to verify the data. Overall, this review suggests that the use of multimedia as an adjunct to conventional consent appears to improve patient comprehension. Multimedia leads to high patient satisfaction in terms of feasibility, ease of use, and availability of information. There is no conclusive evidence demonstrating a significant reduction in preoperative anxiety.

  2. Evaluation of nuclear power plant operating procedures classifications and interfaces: Problems and techniques for improvement

    International Nuclear Information System (INIS)

    Barnes, V.E.; Radford, L.R.

    1987-02-01

    This report presents activities and findings of a project designed to evaluate current practices and problems related to procedure classification schemes and procedure interfaces in commercial nuclear power plants. The phrase ''procedure classification scheme'' refers to how plant operating procedures are categorized and indexed (e.g., normal, abnormal, emergency operating procedures). The term ''procedure interface'' refers to how reactor operators are instructed to transition within and between procedures. The project consisted of four key tasks, including (1) a survey of literature regarding problems associated with procedure classifications and interfaces, as well as techniques for overcoming them; (2) interviews with experts in the nuclear industry to discuss the appropriate scope of different classes of operating procedures and techniques for managing interfaces between them; (3) a reanalysis of data gathered about nuclear power plant normal operating and off-normal operating procedures in a related project, ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants''; and (4) solicitation of the comments and expert opinions of a peer review group on the draft project report and on proposed techniques for resolving classification and interface issues. In addition to describing these activities and their results, recommendations for NRC and utility actions to address procedure classification and interface problems are offered

  3. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  4. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  5. AGREED-UPON PROCEDURES, PROCEDURES FOR AUDITING EUROPEAN GRANTS

    Directory of Open Access Journals (Sweden)

    Daniel Petru VARTEIU

    2016-12-01

    The audit of EU-funded projects is an audit based on agreed-upon procedures, which are established by the Managing Authority or the Intermediate Body. Agreed-upon procedures can be defined as engagements made in accordance with ISRS 4400, applicable to agreed-upon procedures, where the auditor undertakes to carry out the agreed-upon procedures and issue a report on factual findings. The report provided by the auditor does not express any assurance. It allows users to form their own opinions about the conformity of the expenses with the project budget as well as the eligibility of the expenses.

  6. 48 CFR 1552.237-70 - Contract publication review procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review... journal article to the Project Officer, and one copy to the Contracting Officer. (d) If the Government has... AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  7. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  8. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  9. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  10. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  11. Creating Online Training for Procedures in Global Health with PEARLS (Procedural Education for Adaptation to Resource-Limited Settings).

    Science.gov (United States)

    Bensman, Rachel S; Slusher, Tina M; Butteris, Sabrina M; Pitt, Michael B; On Behalf Of The Sugar Pearls Investigators; Becker, Amanda; Desai, Brinda; George, Alisha; Hagen, Scott; Kiragu, Andrew; Johannsen, Ron; Miller, Kathleen; Rule, Amy; Webber, Sarah

    2017-11-01

    The authors describe a multiinstitutional collaborative project to address a gap in global health training by creating a free online platform to share a curriculum for performing procedures in resource-limited settings. This curriculum called PEARLS (Procedural Education for Adaptation to Resource-Limited Settings) consists of peer-reviewed instructional and demonstration videos describing modifications for performing common pediatric procedures in resource-limited settings. Adaptations range from the creation of a low-cost spacer for inhaled medications to a suction chamber for continued evacuation of a chest tube. By describing the collaborative process, we provide a model for educators in other fields to collate and disseminate procedural modifications adapted for their own specialty and location, ideally expanding this crowd-sourced curriculum to reach a wide audience of trainees and providers in global health.

  12. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  13. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  14. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  15. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  16. Barriers and enablers to the provision of alcohol treatment among Aboriginal Australians: a thematic review of five research projects.

    Science.gov (United States)

    Gray, Dennis; Wilson, Mandy; Allsop, Steve; Saggers, Sherry; Wilkes, Edward; Ober, Coralie

    2014-09-01

    To review the results of five research projects commissioned to enhance alcohol treatment among Aboriginal Australians, and to highlight arising from them. Drafts of the papers were workshopped by project representatives, final papers reviewed and results summarised. Lessons arising were identified and described. While the impact of the projects varied, they highlight the feasibility of adapting mainstream interventions in Aboriginal Australian contexts. Outcomes include greater potential to: screen for those at risk; increase community awareness; build capacity and partnerships between organisations; and co-ordinate comprehensive referral networks and service provision. Results show a small investment can produce sustainable change and positive outcomes. However, to optimise and maintain investment, cultural difference needs to be recognised in both planning and delivery of alcohol interventions; resources and funding must be responsive to and realistic about the capacities of organisations; partnerships need to be formed voluntarily based on respect, equality and trust; and practices and procedures within organisations need to be formalised. There is no simple way to reduce alcohol-related harm in Aboriginal communities. However, the papers reviewed show that with Aboriginal control, modest investment and respectful collaboration, service enhancements and improved outcomes can be achieved. Mainstream interventions need to be adapted to Aboriginal settings, not simply transferred. The lessons outlined provide important reflections for future research. © 2014 Australasian Professional Society on Alcohol and other Drugs.

  17. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  18. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  19. Tanks Focus Area midyear review report FY00

    International Nuclear Information System (INIS)

    Roeder-Smith, R.D.

    2000-01-01

    In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements

  20. Implementing Climate-Compatible Development in the Context of Power: Lessons for Encouraging Procedural Justice through Community-Based Projects

    Directory of Open Access Journals (Sweden)

    Benjamin T. Wood

    2018-05-01

    Full Text Available Climate-compatible development (CCD is being operationalised across the developing world through projects that integrate development, adaptation and mitigation using community-based approaches—community-based CCD (CB-CCD. By incorporating and considering local people’s concerns, these projects are positioned as more effective, efficient and sustainable than ‘top-down’ climate and development solutions. However, the literature pays little attention to whether and how these projects achieve procedural justice by recognising local people’s identities, cultures and values; and providing local people with meaningful participatory opportunities. We address this gap through an analysis of two donor-funded CB-CCD projects in Malawi, drawing on household surveys, semi-structured interviews and documentary materials. Our findings show that the projects had only limited success in facilitating procedural justice for the target populations. Households’ meaningful engagement in project activities and decision-making was often curtailed because power asymmetries went unchallenged. While many households were well engaged in projects, the recognition and participation of others—including many of the most vulnerable households—was limited. Building on our findings, we present a six-step approach to help CB-CCD project staff understand, manage and challenge power asymmetries; and create widespread recognition of, and meaningful participatory opportunities for, local people.

  1. 21 CFR 814.116 - Procedures for review of an HDE.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Procedures for review of an HDE. 814.116 Section 814.116 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES...), effective Aug. 16, 2010. For the convenience of the user, the added text is set forth as follows: § 814.116...

  2. Judgments of Restrictiveness, Social Acceptability, and Usage: Review of Research on Procedures to Decrease Behavior

    OpenAIRE

    Morgan, Robert L.

    1989-01-01

    Research on professionals’, consumers’, and others’ judgments of the restrictiveness, social acceptability, and estimated frequency of use of procedures to decrease behavior were reviewed. General findings were that (a) respondents generally were consistent in rating procedures from least to most restrictive; (b) most respondents agreed that procedures judged more restrictive should be used as a last resort; (c) more restrictive procedures were not frequently used in practice; (d) respondents...

  3. Nitrous oxide provides safe and effective analgesia for minor paediatric procedures - a systematic review

    DEFF Research Database (Denmark)

    Pedersen, Rie S; Bayat, Allan; Steen, Nick Phaff

    2013-01-01

    Pain and distress during minor hospital-related procedures is a familiar problem in many children. Inadequate relief of children's procedural pain and distress not only affects the experience of the children and their parents, but also adversely impacts procedural success. We aimed to review the ...... the safety and efficacy of nitrous oxide during brief, but painful paediatric procedures and to compare nitrous oxide with some of the commonly used pharmacological and non-pharmacological treatments for relieving anxiety and mild to moderate pain in Denmark....

  4. Is the evidence supporting dental procedures strong? A survey of Cochrane systematic reviews in oral health.

    Science.gov (United States)

    Faggion, Clovis Mariano

    2012-09-01

    Every day a large number and variety of dental procedures are performed in clinical dental practice. There is, however, no information on the overall quality of evidence supporting these procedures. The objective of this study was to assess whether several common dental procedures are based on sound evidence. All Cochrane systematic reviews (CSR) published in dentistry were surveyed. The authors' conclusions about the quality of evidence supporting a specific clinical treatment were used as the measure of outcome. The evidence was considered adequate if the authors did not clearly state the evidence was weak in the conclusions while also suggesting some evidence of the effectiveness of the therapy. Of 120 CSRs assessed, in only 26 (22.0% of the reviews) was the quality of evidence regarded as adequate for supporting clinical decisions, although some methodological limitations were identified in the full text of these reviews. Moreover, the authors of most reviews reported weak or unavailable evidence. On the basis of CSRs, the overall quality of evidence can be regarded as low or nonexistent for most of the dental procedures assessed. The information reported may guide future research. Copyright © 2012 Elsevier Inc. All rights reserved.

  5. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  6. [Mood induction procedures: a critical review].

    Science.gov (United States)

    Gilet, A-L

    2008-06-01

    For a long period in the history of psychological research, emotion and cognition have been studied independently, as if one were irrelevant to the other. The renewed interest of researchers for the study of the relations between cognition and emotion has led to the development of a range of laboratory methods for inducing temporary mood states. This paper aims to review the main mood induction procedures allowing the induction of a negative mood as well as a positive mood, developed since the pioneer study of Schachter and Singer [Psychol Rev 69 (1962) 379-399] and to account for the usefulness and problems related to the use of such techniques. The first part of this paper deals with the detailed presentation of some of the most popular mood induction procedures according to their type: simple (use of only one mood induction technique) or combined (association of two or more techniques at once). The earliest of the modern techniques is the Velten Mood Induction Procedure [Behav Res Ther 6 (1968) 473-482], which involves reading aloud sixty self-referent statements progressing from relative neutral mood to negative mood or dysphoria. Some researchers have varied the procedure slightly by changing the number of the statements [Behav Res Ther 21 (1983) 233-239, Br J Clin Psychol 21 (1982) 111-117, J Pers Soc Psychol 35 (1977) 625-636]. Various other mood induction procedures have been developed including music induction [Cogn Emotion 11 (1997) 403-432, Br J Med Psychol 55 (1982) 127-138], film clip induction [J Pers Soc Psychol 20 (1971) 37-43, Cogn Emotion 7 (1993) 171-193, Rottenberg J, Ray RR, Gross JJ. Emotion elicitation using films. In: Coan JA, Allen JJB, editors. The handbook of emotion elicitation and assessment. New York: Oxford University Press, 2007], autobiographical recall [J Clin Psychol 36 (1980) 215-226, Jallais C. Effets des humeurs positives et négatives sur les structures de connaissances de type script. Thèse de doctorat non publi

  7. Acidic deposition: State of science and technology. Report 14. Methods for projecting future changes in surface water acid-base chemistry. Final report

    International Nuclear Information System (INIS)

    Thornton, K.W.; Marmorek, D.; Ryan, P.F.; Heltcher, K.; Robinson, D.

    1990-09-01

    The objectives of the report are to: critically evaluate methods for projecting future effects of acidic deposition on surface water acid-base chemistry; review and evaluate techniques and procedures for analyzing projection uncertainty; review procedures for estimating regional lake and stream population attributes; review the U.S. Environmental Protection Agency (EPA) Direct/Delayed Response Project (DDRP) methodology for projecting the effects of acidic deposition on future changes in surface water acid-base chemistry; and present the models, uncertainty estimators, population estimators, and proposed approach selected to project the effects of acidic deposition on future changes in surface water acid-base chemistry in the NAPAP 1990 Integrated Assessment and discuss the selection rationale

  8. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  9. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  10. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  11. TFA Tanks Focus Area midyear review report FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    LR Roeder-Smith

    2000-05-02

    In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements.

  12. Cost Finding Principles and Procedures. Preliminary Field Review Edition. Technical Report 26.

    Science.gov (United States)

    Ziemer, Gordon; And Others

    This report is part of the Larger Cost Finding Principles Project designed to develop a uniform set of standards, definitions, and alternative procedures that will use accounting and statistical data to find the full cost of resources utilized in the process of producing institutional outputs. This technical report describes preliminary procedures…

  13. 78 FR 22490 - Administrative Practice and Procedure; Postal Service; Review of Price Cap Rules

    Science.gov (United States)

    2013-04-16

    ...] Administrative Practice and Procedure; Postal Service; Review of Price Cap Rules AGENCY: Postal Regulatory Commission. ACTION: Proposed rule. SUMMARY: The Commission is initiating a review of its Price Cap Rules. The... implemented without a price cap calculation. Docket No. R2011-5, Order Approving Market Dominant Price...

  14. 40 CFR 26.1110 - Expedited review procedures for certain kinds of research involving no more than minimal risk...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Expedited review procedures for certain....1110 Section 26.1110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROTECTION OF... Intentional Exposure of Non-pregnant, Non-nursing Adults § 26.1110 Expedited review procedures for certain...

  15. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  16. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  17. Risk of bleeding associated with interventional musculoskeletal radiology procedures. A comprehensive review of the literature

    Energy Technology Data Exchange (ETDEWEB)

    Foremny, Gregory B.; Jose, Jean; Subhawong, Ty K. [University of Miami Miller School of Medicine, Department of Radiology, Jackson Memorial Hospital, Miami, FL (United States); Pretell-Mazzini, Juan [University of Miami Miller School of Medicine, Department of Orthopaedic Surgery-Division of Musculoskeletal Oncology, Miami, FL (United States)

    2015-05-01

    This review compiles the current literature on the bleeding risks in common musculoskeletal interventional procedures and attempts to provide guidance for practicing radiologists in making decisions regarding the periprocedural management of patients on antithrombotic therapy. The practitioner must weigh the risk of bleeding if therapy is continued against the possibility a thromboembolic occurring if anticoagulation therapy is withheld or reversed. Unfortunately, there is little empirical data to guide evidence-based decisions for many musculoskeletal interventions. However, a review of the literature shows that for low-risk procedures, such as arthrograms/arthrocenteses or muscle/tendon sheath injections, bleeding risks are sufficiently small that anticoagulants and antiplatelet therapies need not be withheld. Additionally, relatively higher-risk procedures, such as needle biopsies of bone and soft tissue, may be safely performed without holding antithrombotic therapy, provided pre-procedural INR is within therapeutic range. Thus, while a patient's particular clinical circumstances should dictate optimal individualized management, anticoagulation alone is not a general contraindication to most interventional musculoskeletal radiology procedures. (orig.)

  18. Integration technique of digital I and C replacement and its Critical Digital Review procedure

    International Nuclear Information System (INIS)

    Huang, Hui-Wen; Yang, Wen-Long

    2013-01-01

    Highlights: ► A digital I and C replacement integration technique have been developed. ► Establishment of Nuclear Power Plant Digital Replacement Integration Guideline. ► Preliminary Investigation on I and C System Digitalization. ► Evaluation on I and C System Digitalization. ► Establishment of I and C System Digitalization Architectures. -- Abstract: Institute of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin–Shan (CS) NPP, Kuo–Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) procedure. The digital I and C replacement integration technique includes: (1) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR-1011710 (2005) “Handbook for Evaluating Critical Digital Equipment and Systems” which was published by the Electric Power Research Institute (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SV and V), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of

  19. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  20. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    Energy Technology Data Exchange (ETDEWEB)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius (Bergab Consulting Geologists, Goeteborg (Sweden))

    2010-09-15

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  1. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    International Nuclear Information System (INIS)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius

    2010-09-01

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  2. Safety of Running Two Rooms: A Systematic Review and Meta-Analysis of Overlapping Neurosurgical Procedures.

    Science.gov (United States)

    Self, D Mitchell; Ilyas, Adeel; Stetler, William R

    2018-04-27

    Overlapping surgery, a long-standing practice within academic neurosurgery centers nationwide, has recently come under scrutiny from the government and media as potentially harmful to patients. Therefore, the objective of this systematic review and meta-analysis is to determine the safety of overlapping neurosurgical procedures. The authors performed a systematic review and meta-analysis in accordance with PRISMA guidelines. A review of PubMed and Medline databases was undertaken with the search phrase "overlapping surgery AND neurosurgery AND outcomes." Data regarding patient demographics, type of neurosurgical procedure, and outcomes and complications were extracted from each study. The principle summary measure was odds ratio (OR) of the association of overlapping versus non-overlapping surgery with outcomes. The literature search yielded a total of 36 studies, of which 5 studies met inclusion criteria and were included in this study. These studies included a total of 25,764 patients undergoing neurosurgical procedures. Overlapping surgery was associated with an increased likelihood of being discharged home (OR = 1.32; 95% CI 1.20 to 1.44; P < 0.001) and a reduced 30-day unexpected return to the operating room (OR = 0.79; 95% CI 0.72 to 0.87; P < 0.001). Overlapping surgery did not significantly affect OR of length of surgery, 30-day mortality, or 30-day readmission. Overlapping neurosurgical procedures were not associated with worse patient outcomes. Additional, prospective studies are needed to further assess the safety overlapping procedures. Copyright © 2018. Published by Elsevier Inc.

  3. Harmonisation of wind turbine certification in Europe JOULE project EWTC

    Energy Technology Data Exchange (ETDEWEB)

    Nath, C [Germanischer Lloyd, Hamburg (Germany); Eriksson, C [Det Norske Veritas, Hellerup (Denmark); Hulle, F van [Frans van Hulle, Petten (Netherlands); Skamris, C [Risoe National Lab., Roskilde (Denmark); Stam, W [CIWI Holland, Arnheim (Netherlands); Vionis, P [CRES, Attki (Greece)

    1999-03-01

    Wind turbine certification requirements are currently fairly divers within Europe. Therefore the leading European certification bodies initiated a JOULE project to harmonise the certification procedure on the basis of the current set of IEC/EN 61400 series standards. The paper presents a review of the state of the art of wind turbine certification in European countries and an outline of the sturcture of the project. The main steps of the project are (a) the collection of differences in certification practices by round robin certification of three wind turbine types; (b) assessment of the different certification results and (c) the development of a harmonised certification procedure. (au) EU-JOULE-3. 19 refs.

  4. Instructional Computing Project Uses "Multiplier Effect" to Train Florida Teachers.

    Science.gov (United States)

    Roblyer, M. D.; Castine, W. H.

    1987-01-01

    Reviews the efforts undertaken in the Florida Model Microcomputer Trainer Project (FMMTP) and its statewide impact. Outlines its procedural strategies, trainer curriculum, networking system, and the results of its multiplier effect. (ML)

  5. Bivalirudin for Pediatric Procedural Anticoagulation: A Narrative Review.

    Science.gov (United States)

    Zaleski, Katherine L; DiNardo, James A; Nasr, Viviane G

    2018-02-14

    Bivalirudin (Angiomax; The Medicines Company, Parsippany, NJ), a direct thrombin inhibitor, has found increasing utilization as a heparin alternative in the pediatric population, most commonly for the treatment of thrombosis secondary to heparin-induced thrombocytopenia. Due to the relative rarity of heparin-induced thrombocytopenia as well as the lack of Food and Drug Administration-approved indications in this age group, much of what is known regarding the pharmacokinetics and pharmacodynamics of bivalirudin in this population has been extrapolated from adult data. This narrative review will present recommendations regarding the use of bivalirudin for procedural anticoagulation in the pediatric population based on the published literature.

  6. 76 FR 60774 - Review and Approval of Projects

    Science.gov (United States)

    2011-09-30

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...

  7. Conference on authorisation procedures and territorial integration of methanation projects

    International Nuclear Information System (INIS)

    Boettcher, Katharina; Furois, Timothee; Molinie, Lea; Fuseliez, Sabrina; Stolpp, Sebastian; Lavoue, Fannie; Grosse, Andreas; Charbeaux, Veronique; Chapelat, Nicolas; Merigout, Patricia; Stinner, Walter; Trommler, Marcus; Jacobi, H. Fabian; Mauky, E.; Weinrich, S.

    2014-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on the authorisation procedures and the territorial integration of methanation projects. In the framework of this French-German exchange of experience, participants exchanged views on the situation of methanation industry in both countries, on the legal framework of authorization procedures, and on the different local strategies for the integration of methanation facilities. A series of presentations deal with the use of digestates and put forward the differences between France and Germany in the use and valorization of methanation digestates. This document brings together the available presentations (slides) made during this event: 1 - Bioenergy in the energy system of the future - Policy framework, new biogas regulations in the EEG 2014 German law (Katharina Boettcher); 2 - The energy Transition for Green Growth law and its role for the French biogas (Timothee Furois); 3 - The 'EMAA' (Energy Methanation Autonomy Nitrogen) plan - Progress status (Lea Molinie); 4 - Biogas in France: current status and outlooks, structuration of a developing industry and its role in the energy transition (Sabrina Fuseliez); 5 - Biogas market in Germany and potentials for development (Sebastian Stolpp); 6 - Authorization procedures in France, and the new unique authorization (Fannie Lavoue); 7 - Approval procedures for biogas plants and the protection of neighbours' rights in Germany (Andreas Grosse); 8 - Regional strategy of methanation development in Ile-de-France (Veronique Charbeaux) 9 - Renewable region and biogas integration: the Brittany biogas plan (Nicolas Chapelat); 10 - Bioenergy regions and the role of biogas - Good examples for sustainable bio-energy use (Birger Kerckow); 11 - Evaluation for registration in france of digestates produced by anaerobic digestion (Patricia Merigout); 12 - Treatment and Conditioning of Fermentation Residues from Biogas Plants (Marcus Trommler); 13

  8. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network of Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasizes the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting the NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper

  9. European DataGrid project Status and plans

    CERN Document Server

    Kunszt, Peter Z

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets - from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been conti...

  10. High-speed technique based on a parallel projection correlation procedure for digital image correlation

    Science.gov (United States)

    Zaripov, D. I.; Renfu, Li

    2018-05-01

    The implementation of high-efficiency digital image correlation methods based on a zero-normalized cross-correlation (ZNCC) procedure for high-speed, time-resolved measurements using a high-resolution digital camera is associated with big data processing and is often time consuming. In order to speed-up ZNCC computation, a high-speed technique based on a parallel projection correlation procedure is proposed. The proposed technique involves the use of interrogation window projections instead of its two-dimensional field of luminous intensity. This simplification allows acceleration of ZNCC computation up to 28.8 times compared to ZNCC calculated directly, depending on the size of interrogation window and region of interest. The results of three synthetic test cases, such as a one-dimensional uniform flow, a linear shear flow and a turbulent boundary-layer flow, are discussed in terms of accuracy. In the latter case, the proposed technique is implemented together with an iterative window-deformation technique. On the basis of the results of the present work, the proposed technique is recommended to be used for initial velocity field calculation, with further correction using more accurate techniques.

  11. Selecting aesthetic gynecologic procedures for plastic surgeons: a review of target methodology.

    Science.gov (United States)

    Ostrzenski, Adam

    2013-04-01

    The objective of this article was to assist cosmetic-plastic surgeons in selecting aesthetic cosmetic gynecologic-plastic surgical interventions. Target methodological analyses of pertinent evidence-based scientific papers and anecdotal information linked to surgical techniques for cosmetic-plastic female external genitalia were examined. A search of the existing literature from 1900 through June 2011 was performed by utilizing electronic and manual databases. A total of 87 articles related to cosmetic-plastic gynecologic surgeries were identified in peer-review journals. Anecdotal information was identified in three sources (Barwijuk, Obstet Gynecol J 9(3):2178-2179, 2011; Benson, 5th annual congress on aesthetic vaginal surgery, Tucson, AZ, USA, November 14-15, 2010; Scheinberg, Obstet Gynecol J 9(3):2191, 2011). Among those articles on cosmetic-plastic gynecologic surgical technique that were reviewed, three articles met the criteria for evidence-based medicine level II, one article was level II-1 and two papers were level II-2. The remaining papers were classified as level III. The pertinent 25 papers met the inclusion criteria and were analyzed. There was no documentation on the safety and effectiveness of cosmetic-plastic gynecologic procedures in the scientific literature. All published surgical interventions are not suitable for a cosmetic-plastic practice. The absence of documentation on safety and effectiveness related to cosmetic-plastic gynecologic procedures prevents the establishment of a standard of practice. Traditional gynecologic surgical procedures cannot be labeled and used as cosmetic-plastic procedures, it is a deceptive practice. Obtaining legal trademarks on traditional gynecologic procedures and creating a business model that tries to control clinical-scientific knowledge dissemination is unethical. This journal requires that authors assign a level of evidence to each article. For a full description of these Evidence-Based Medicine ratings

  12. Techniques for preparing flowchart-format emergency operating procedures: Background (Sections 1.0-9.0)

    International Nuclear Information System (INIS)

    Barnes, V.E.; Moore, C.J.; Wieringa, D.R.; Isakson, C.S.; Kono, B.K.; Gruel, R.L.

    1989-01-01

    This two-volume report describes the activities, findings, and recommendations of a project entitled ''Techniques for Presenting Flowchart-Format Emergency Operating Procedures.'' The project team surveyed the literature pertaining to flowcharts, reviewed existing flowchart emergency operating procedures (EOPs), interviewed consultants who produced flowcharts, and interviewed reactor operator licensing examiners about the use of flowcharts in nuclear power plants. This document, and Volume 1 of this report, discusses the use of flowchart-format EOPs in nuclear power plants and presents issue to be addressed in the design and implementation of flowchart EOPs. 66 refs., 76 figs., 2 tabs

  13. 15 CFR 400.32 - Procedure for review of request for approval of manufacturing or processing.

    Science.gov (United States)

    2010-01-01

    ... approval of manufacturing or processing. 400.32 Section 400.32 Commerce and Foreign Trade Regulations... REGULATIONS OF THE FOREIGN-TRADE ZONES BOARD Manufacturing and Processing Activity-Reviews § 400.32 Procedure for review of request for approval of manufacturing or processing. (a) Request as part of application...

  14. Distribution of kerma rate in the air inside of hemodynamic room for typical projections of interventionist cardiology procedures

    International Nuclear Information System (INIS)

    Sanchez, Mirtha Elizabet Gamarra

    2008-01-01

    The evaluation of dose to physicians involved in Interventional Cardiology (IC) is an extreme important matter due to the high and non-uniform distribution of dose values. The radiation control during each procedure is complex and the reasons for the high exposures have many different causes. Many international recommendations have already been written aiming the radiation protection optimization in IC. In Brazil, there is not any special orientation for the protection of those occupational persons, nor a specific legislation. The purpose of this work is to evaluate the air kerma rate at critical anatomic regions of the occupationally exposed staff that carry out IC procedures, in representative incidences in order to give subsidies for individual monitoring procedures implementation and to give more information about their radiation protection. The air kerma rate has been measured in the often used condition in the two more common IC procedures namely angiography and coronary angioplasty, using an adult patient simulator irradiated under RAO, LAO and AP projections for fluoro and digital acquisition modes. The measurements have been made in 45 points around the examination table at 5 different representatives heights of: eyes lens, thorax, hands, gonads and knees. AP projection shows the smaller scattered radiation contributions and a more homogeneous exposure distribution. The digital acquisition mode gives air kerma rates about 4 times higher than fluoro mode for LAO projection in the position occupied by the interventionist doctor, the anesthetist and the nursing staff. The most critical anatomic regions are: knees and gonads (without protection). On the physician hands position, values as high as 5 mGy/h have been measured, which can overpass, depending on the number of procedures done, the individual occupational annual limit. Therefore, in IC it is necessary to implement additional protection tools, elaborate safety guides (based on international experiences

  15. Technology and peer review: the open and participatory dimension

    Directory of Open Access Journals (Sweden)

    Fedeli Laura

    2015-12-01

    Full Text Available Peer review is a consolidated procedure in the academic context and its process affects various range of research outputs from project funding applications to manuscript publication. Peer review can be developed through modalities that imply a different level of transparency in the relationship between anonymity of the author and the reviewer/s.

  16. INDEFINITE CONTRACT REVIEW 1999 Procedure for Research Physicists (Professional Category 1)

    CERN Multimedia

    1999-01-01

    In view of the long-standing deliberate turnover policy of professional category 1 research physicists on fixed-term contracts, a special procedure is defined, distinct from the other professional categories. This procedure takes into account that research physicists stay at CERN for only up to 6 years and that periods of service as Fellow may be counted within these six years.The following procedure has been agreed:1.\tThe review covers research physicists holding fixed-term contracts and having completed at least 4 years of service on 30 June 1999. Prior years as Fellow may be taken into consideration in the specific context.\tAll candidates are informed individually.2.\tThe files of all candidates are considered by search committees. The members of the committees are nominated by the Director-General and comprise members of the senior CERN staff as well as at least one senior external physicist. The committees are free to take up references and to interview the candidates.3.\tIn ord...

  17. Retinoids: literature review and suggested algorithm for use prior to facial resurfacing procedures

    Directory of Open Access Journals (Sweden)

    Patrick J Buchanan

    2016-01-01

    Full Text Available Vitamin A-containing products have been used topically since the early 1940s to treat various skin conditions. To date, there are four generations of retinoids, a family of Vitamin A-containing compounds. Tretinoin, all-trans-retinoic acid, is a first-generation, naturally occurring, retinoid. It is available, commercially, as a gel or cream. The authors conducted a complete review of all studies, clinical- and basic science-based studies, within the literature involving tretinoin treatment recommendations for impending facial procedures. The literature currently lacks definitive recommendations for the use of tretinoin-containing products prior to undergoing facial procedures. Tretinoin pretreatment regimens vary greatly in terms of the strength of retinoid used, the length of the pre-procedure treatment, and the ideal time to stop treatment before the procedure. Based on the current literature and personal experience, the authors set forth a set of guidelines for the use of tretinoin prior to various facial procedures.

  18. A Review of Cash Management Policies, Procedures and Practices of Mississippi's Institutions of Higher Learning.

    Science.gov (United States)

    Mississippi State Legislature, Jackson. Performance Evaluation and Expenditure Review Committee.

    This report to the Mississippi Legislature presents the findings of a review of the cash management policies, procedures, and practices of the State Board of Trustees of Institutions of Higher Learning (IHL). The methodology involved review of: applicable Mississippi statutes; standards promulgated by the National Association of College and…

  19. 75 FR 78988 - Post-2014 Resource Pool-Loveland Area Projects, Allocation Procedures and Call for Applications

    Science.gov (United States)

    2010-12-17

    ... Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), is publishing this... customers and for other appropriate purposes as determined by Western. These allocation procedures and call for applications, in conjunction with the Loveland Area Projects (LAP) Final Post-1989 Marketing Plan...

  20. Summary of literature review of risk communication: Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Byram, S.J.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation exposures people may have received from radioactive materials released during past operations at the Department of Energy's Hanford Site near Richland, Washington. The project is being conducted by Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The Centers for Disease Control (CDC) will use HEDR dose estimates in studies to investigate a potential link between thyroid disease and historical Hanford emissions. The HEDR Project was initiated to address public concerns about the possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to communicate effectively to the many different concerned audiences. To identify and develop these mechanisms, the TSP issued Directive 89-7 to PNL in May 1989. The TSP directed PNL to examine methods to communicate the causes and effects of uncertainties in the dose estimates. A literature review was conducted as the first activity in response to the TSP's directive. This report presents the results of the literature review. The objective of the literature review was to identify ''key principles'' that could be applied to develop communications strategies for the project. 26 refs., 6 figs

  1. Development of a draft of human factors safety review procedures for the Korean Next Generation Reactor

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C.

    2000-02-01

    In this study, a draft of Human Factors Engineering (HFE) Safety Review Procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE program management, human factors analyses, human factors design, and HFE verification and validation, based on section 15.1 'human factors engineering design process' and 15.2 'control room human factors engineering' of KNGR specific safety requirements and chapter 15 'human factors engineering' of KNGR safety regulatory guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system

  2. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  3. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  4. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  5. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network for Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasises the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper. (author). 2 refs, 6 figs

  6. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  7. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  8. Procedure-related risk of miscarriage following amniocentesis and chorionic villus sampling: a systematic review and meta-analysis.

    Science.gov (United States)

    Akolekar, R; Beta, J; Picciarelli, G; Ogilvie, C; D'Antonio, F

    2015-01-01

    To estimate procedure-related risks of miscarriage following amniocentesis and chorionic villus sampling (CVS) based on a systematic review of the literature and a meta-analysis. A search of MEDLINE, EMBASE, CINHAL and The Cochrane Library (2000-2014) was performed to review relevant citations reporting procedure-related complications of amniocentesis and CVS. Only studies reporting data on more than 1000 procedures were included in this review to minimize the effect of bias from smaller studies. Heterogeneity between studies was estimated using Cochran's Q, the I(2) statistic and Egger bias. Meta-analysis of proportions was used to derive weighted pooled estimates for the risk of miscarriage before 24 weeks' gestation. Incidence-rate difference meta-analysis was used to estimate pooled procedure-related risks. The weighted pooled risks of miscarriage following invasive procedures were estimated from analysis of controlled studies including 324 losses in 42 716 women who underwent amniocentesis and 207 losses in 8899 women who underwent CVS. The risk of miscarriage prior to 24 weeks in women who underwent amniocentesis and CVS was 0.81% (95% CI, 0.58-1.08%) and 2.18% (95% CI, 1.61-2.82%), respectively. The background rates of miscarriage in women from the control group that did not undergo any procedures were 0.67% (95% CI, 0.46-0.91%) for amniocentesis and 1.79% (95% CI, 0.61-3.58%) for CVS. The weighted pooled procedure-related risks of miscarriage for amniocentesis and CVS were 0.11% (95% CI, -0.04 to 0.26%) and 0.22% (95% CI, -0.71 to 1.16%), respectively. The procedure-related risks of miscarriage following amniocentesis and CVS are much lower than are currently quoted. Copyright © 2014 ISUOG. Published by John Wiley & Sons Ltd.

  9. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  10. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  11. Economic Evaluation Methodology Review on KAERI's Recent Projects

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons

  12. Fresnel diffraction correction by phase-considered iteration procedure in soft X-ray projection microscopy

    International Nuclear Information System (INIS)

    Shiina, Tatsuo; Suzuki, Tsuyoshi; Honda, Toshio; Ito, Atsushi; Kinjo, Yasuhito; Yoshimura, Hideyuki; Yada, Keiji; Shinohara, Kunio

    2009-01-01

    In soft X-ray projection microscopy, it is easy to alter the magnification by changing the distance between the pinhole and the specimen, while the image is blurred because the soft X-rays are diffracted through the propagation from specimen to CCD detector. We corrected the blurred image by the iteration procedure of Fresnel to inverse Fresnel transformation taking phase distribution of the specimen into account. The experiments were conducted at the BL-11A of the Photon Factory, KEK, Japan for the specimens such as glass-capillaries, latex-particles, dried mammalian cells and human chromosomes. Many of those blurred images were corrected adequately by the iteration procedure, though some images such as those which have high-contrast or are overlapped by small cells still remain to be improved.

  13. 28 CFR 91.58 - Timing of the environmental review process.

    Science.gov (United States)

    2010-07-01

    ... CORRECTIONAL FACILITIES Environmental Impact Review Procedures for VOI/TIS Grant Program Environmental Review... anticipated environmental impacts, an environmental impact statement should be initiated. (c) Design phase... projects under construction, OJP will work with the States to determine what environmental analysis has...

  14. European DataGrid project: status and plans

    International Nuclear Information System (INIS)

    Kunszt, P.

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets--from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been continuously refined according to the requirements of our user communities and our experience

  15. Review and Application of Ship Collision and Grounding Analysis Procedures

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup

    2010-01-01

    It is the purpose of the paper to present a review of prediction and analysis tools for collision and grounding analyses and to outline a probabilistic procedure for which these tools can be used by the maritime industry to develop performance based rules to reduce the risk associated with human,......, environmental and economic costs of collision and grounding events. The main goal of collision and grounding research should be to identify the most economic risk control options associated with prevention and mitigation of collision and grounding events....

  16. Development of a draft of human factors safety review procedures for the Korean next generation reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-02-01

    In this study, a draft of human factors engineering (HFE) safety review procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE Program Management, Human Factors Analyses, Human Factors Design, and HFE Verification and Validation, based on Section 15.1 'Human Factors Engineering Design Process' and 15.2 'Control Room Human Factors Engineering' of KNGR Specific Safety Requirements and Chapter 15 'Human Factors Engineering' of KNGR Safety Regulatory Guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system. 8 refs., 2 figs. (Author)

  17. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  18. Effectiveness of internet-based affect induction procedures: A systematic review and meta-analysis.

    Science.gov (United States)

    Ferrer, Rebecca A; Grenen, Emily G; Taber, Jennifer M

    2015-12-01

    Procedures used to induce affect in a laboratory are effective and well-validated. Given recent methodological and technological advances in Internet research, it is important to determine whether affect can be effectively induced using Internet methodology. We conducted a meta-analysis and systematic review of prior research that has used Internet-based affect induction procedures, and examined potential moderators of the effectiveness of affect induction procedures. Twenty-six studies were included in final analyses, with 89 independent effect sizes. Affect induction procedures effectively induced general positive affect, general negative affect, fear, disgust, anger, sadness, and guilt, but did not significantly induce happiness. Contamination of other nontarget affect did not appear to be a major concern. Video inductions resulted in greater effect sizes. Overall, results indicate that affect can be effectively induced in Internet studies, suggesting an important venue for the acceleration of affective science. (PsycINFO Database Record (c) 2015 APA, all rights reserved).

  19. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  20. Alternative practices of achieving anaesthesia for dental procedures: a review.

    Science.gov (United States)

    Angelo, Zavattini; Polyvios, Charalambous

    2018-04-01

    Managing pain and anxiety in patients has always been an essential part of dentistry. To prevent pain, dentists administer local anaesthesia (LA) via a needle injection. Unfortunately, anxiety and fear that arise prior to and/or during injection remains a barrier for many children and adults from receiving dental treatment. There is a constant search for techniques to alleviate the invasive and painful nature of the needle injection. In recent years, researchers have developed alternative methods which enable dental anaesthesia to be less invasive and more patient-friendly. The aim of this review is to highlight the procedures and devices available which may replace the conventional needle-administered local anaesthesia. The most known alternative methods in providing anaesthesia in dentistry are: topical anaesthesia, electronic dental anaesthesia, jet-injectors, iontophoresis, and computerized control local anaesthesia delivery systems. Even though these procedures are well accepted by patients to date, it is the authors' opinion that the effectiveness practicality of such techniques in general dentistry is not without limitations.

  1. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  2. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  3. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  4. 76 FR 26302 - Submission for OMB Review; Comment Request; Reunification Procedures for Unaccompanied Alien...

    Science.gov (United States)

    2011-05-06

    ...-0278] Submission for OMB Review; Comment Request; Reunification Procedures for Unaccompanied Alien... and placement of unaccompanied alien children in Federal custody, and implementing a policy for the... Release of Information. Respondents: Sponsors requesting release of unaccompanied alien. Annual Burden...

  5. Patient safety during procedural sedation using capnography monitoring : A systematic review and meta-analysis

    NARCIS (Netherlands)

    Saunders, Rhodri; Struys, Michel M. R. F.; Pollock, Richard F.; Mestek, Michael; Lightdale, Jenifer R.

    2017-01-01

    Objective: To evaluate the effect of capnography monitoring on sedation-related adverse events during procedural sedation and analgesia (PSA) administered for ambulatory surgery relative to visual assessment and pulse oximetry alone. Design and setting: Systematic literature review and random

  6. Nuclear heating - a review of projects in several countries

    International Nuclear Information System (INIS)

    Vymetal, L.

    1980-01-01

    A review is presented of projects and studies of nuclear heat generation and district heating in the USSR, France, Sweden, Finland, USA, FRG, and CSSR. Attention is primarily paid to the nuclear sources, i.e., nuclear power and heating plants and special reactors for nuclear heating plants. The questions of heat transmission and costs are also dealt with. The review is based on the literature published between 1976 and 1979. An important source were materials from the conference on the use of low-potential heat from nuclear reactors held in Otaniemi (Finland) in 1977. (author)

  7. Optimal training design for procedural motor skills: a review and application to laparoscopic surgery

    NARCIS (Netherlands)

    Spruit, E.N.; Band, G.P.H.; Hamming, J.F.; Ridderinkhof, K.R.

    2014-01-01

    This literature review covers the choices to consider in training complex procedural, perceptual and motor skills. In particular, we focus on laparoscopic surgery. An overview is provided of important training factors modulating the acquisition, durability, transfer, and efficiency of trained

  8. Improving child protection: a systematic review of training and procedural interventions.

    Science.gov (United States)

    Carter, Y H; Bannon, M J; Limbert, C; Docherty, A; Barlow, J

    2006-09-01

    To synthesise published evidence regarding the effectiveness of training and procedural interventions aimed at improving the identification and management of child abuse and neglect by health professionals. Systematic review for the period 1994 to 2005 of studies that evaluated child protection training and procedural interventions. Main outcome measures were learning achievement, attitudinal change, and clinical behaviour. Seven papers that examined the effectiveness of procedural interventions and 15 papers that evaluated training programmes met the inclusion criteria. Critical appraisal showed that evaluation of interventions was on the whole poor. It was found that certain procedural interventions (such as the use of checklists and structured forms) can result in improved recording of important clinical information and may also alert clinical staff to the possibility of abuse. While a variety of innovative training programmes were identified, there was an absence of rigorous evaluation of their impact. However a small number of one-group pre- and post-studies suggest improvements in a range of attitudes necessary for successful engagement in the child protection process. Current evidence supports the use of procedural changes that improve the documentation of suspected child maltreatment and that enhance professional awareness. The lack of an evidence based approach to the implementation of child protection training may restrict the ability of all health professionals to fulfil their role in the child protection process. Formal evaluation of a variety of models for the delivery of this training is urgently needed with subsequent dissemination of results that highlight those found to be most effective.

  9. A review of downscaling procedures - a contribution to the research on climate change impacts at city scale

    Science.gov (United States)

    Smid, Marek; Costa, Ana; Pebesma, Edzer; Granell, Carlos; Bhattacharya, Devanjan

    2016-04-01

    Human kind is currently predominantly urban based, and the majority of ever continuing population growth will take place in urban agglomerations. Urban systems are not only major drivers of climate change, but also the impact hot spots. Furthermore, climate change impacts are commonly managed at city scale. Therefore, assessing climate change impacts on urban systems is a very relevant subject of research. Climate and its impacts on all levels (local, meso and global scale) and also the inter-scale dependencies of those processes should be a subject to detail analysis. While global and regional projections of future climate are currently available, local-scale information is lacking. Hence, statistical downscaling methodologies represent a potentially efficient way to help to close this gap. In general, the methodological reviews of downscaling procedures cover the various methods according to their application (e.g. downscaling for the hydrological modelling). Some of the most recent and comprehensive studies, such as the ESSEM COST Action ES1102 (VALUE), use the concept of Perfect Prog and MOS. Other examples of classification schemes of downscaling techniques consider three main categories: linear methods, weather classifications and weather generators. Downscaling and climate modelling represent a multidisciplinary field, where researchers from various backgrounds intersect their efforts, resulting in specific terminology, which may be somewhat confusing. For instance, the Polynomial Regression (also called the Surface Trend Analysis) is a statistical technique. In the context of the spatial interpolation procedures, it is commonly classified as a deterministic technique, and kriging approaches are classified as stochastic. Furthermore, the terms "statistical" and "stochastic" (frequently used as names of sub-classes in downscaling methodological reviews) are not always considered as synonymous, even though both terms could be seen as identical since they are

  10. Review on Population Projection Methodology for Radiological Dose Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jang, M. S.; Kang, H. S.; Kim, S. R. [NESS, Daejeon (Korea, Republic of); Hwang, W. T. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yang, Y. H. [KHNP, Daejeon (Korea, Republic of)

    2015-05-15

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area.

  11. Review on Population Projection Methodology for Radiological Dose Assessment

    International Nuclear Information System (INIS)

    Jang, M. S.; Kang, H. S.; Kim, S. R.; Hwang, W. T.; Yang, Y. H.

    2015-01-01

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area

  12. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  13. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  14. 18 CFR 301.3 - Filing procedures.

    Science.gov (United States)

    2010-04-01

    ... FOR SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER ACT § 301.3 Filing procedures. (a) Bonneville's ASC review procedures. The procedures established by Bonneville's Administrator... Bonneville's ASC review procedures. (b) Exchange Period. The Exchange Period will be equal to the term of...

  15. Successful Control of Major Project Budgets

    Directory of Open Access Journals (Sweden)

    Steen Lichtenberg

    2016-07-01

    Full Text Available This paper differs from scientific papers describing current research. In line with the theme of this special issue, it challenges conventional risk management practice against the background of former research results successfully finished decades ago. It is well-known that conventional practice frequently results in budget overruns of large projects. International reviews document that. Severe delays of schedules are also well-known. This paper describes successful research results from almost three decades ago, which successfully challenges this severe problem and has led to new practices. The research involved is an unusual mix: Scandinavian researchers from psychology, statistical theory and engineering economy. The resulting procedure has been widely used since around 1990 and challenges conventional procedures. The procedure is documented to be able to yield statistically correct prognoses, when the “rules of the game” have been correctly followed. After a short summary of the basic situation, this paper summarizes the research, followed by some resulting experiences, focusing on two recent studies each of 40 infrastructures and other major projects. In both sets, the actual final cost largely equaled the expected project cost. This result is a marked change from international past and present experience. Finally, the need for further research and progress is discussed.

  16. Projecting Future Heat-Related Mortality under Climate Change Scenarios: A Systematic Review

    Science.gov (United States)

    Barnett, Adrian Gerard; Wang, Xiaoming; Vaneckova, Pavla; FitzGerald, Gerard; Tong, Shilu

    2011-01-01

    Background: Heat-related mortality is a matter of great public health concern, especially in the light of climate change. Although many studies have found associations between high temperatures and mortality, more research is needed to project the future impacts of climate change on heat-related mortality. Objectives: We conducted a systematic review of research and methods for projecting future heat-related mortality under climate change scenarios. Data sources and extraction: A literature search was conducted in August 2010, using the electronic databases PubMed, Scopus, ScienceDirect, ProQuest, and Web of Science. The search was limited to peer-reviewed journal articles published in English from January 1980 through July 2010. Data synthesis: Fourteen studies fulfilled the inclusion criteria. Most projections showed that climate change would result in a substantial increase in heat-related mortality. Projecting heat-related mortality requires understanding historical temperature–mortality relationships and considering the future changes in climate, population, and acclimatization. Further research is needed to provide a stronger theoretical framework for projections, including a better understanding of socioeconomic development, adaptation strategies, land-use patterns, air pollution, and mortality displacement. Conclusions: Scenario-based projection research will meaningfully contribute to assessing and managing the potential impacts of climate change on heat-related mortality. PMID:21816703

  17. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  18. Dutch Case Studies Project in Chaplaincy Care : A description and theoretical explanation of the format en procedures

    NARCIS (Netherlands)

    Korver, Sjaak; Walton, Martin N.

    2017-01-01

    The recent surge of case studies in chaplaincy care raises challenges on the comparability of case studies and the degree to which they elucidate the relation between theory and practice. The Dutch Case Studies Project (CSP) addresses these and other issues by use of a set format and procedure and

  19. Implicit Memory in Korsakoff’s Syndrome: A Review of Procedural Learning and Priming Studies

    Science.gov (United States)

    Hayes, Scott M.; Fortier, Catherine B.; Levine, Andrea; Milberg, William P.; McGlinchey, Regina

    2013-01-01

    Korsakoff’s syndrome (KS) is characterized by dense anterograde amnesia resulting from damage to the diencephalon region, typically resulting from chronic alcohol abuse and thiamine deficiency. This review assesses the integrity of the implicit memory system in KS, focusing on studies of procedural learning and priming. KS patients are impaired on several measures of procedural memory, most likely due to impairment in cognitive functions associated with alcohol-related neural damage outside of the diencephalon. The pattern of performance on tasks of implicit priming suggests reliance on a residual, non-flexible memory operating more or less in an automatic fashion. Our review concludes that whether measures of implicit memory reveal intact or impaired performance in individuals with KS depends heavily on specific task parameters and demands, including timing between stimuli, the specific nature of the stimuli used in a task, and the integrity of supportive cognitive functions necessary for performance. PMID:22592661

  20. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  1. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  2. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  3. Analytical quality assurance procedures developed for the IAEA's Reference Asian Man Project (Phase 2)

    International Nuclear Information System (INIS)

    Kawamura, H.; Parr, R.M.; Dang, H.S.; Tian, W.; Barnes, R.M.; Iyengar, G.V.

    2000-01-01

    Analytical quality assurance procedures adopted for use in the IAEA Co-ordinated Research Project on Ingestion and Organ Content of Trace Elements of Importance in Radiological Protection are designed to ensure comparability of the analytical results for Cs, I, Sr, Th, U and other elements in human tissues and diets collected and analysed in nine participating countries. The main analytical techniques are NAA and ICP-MS. For sample preparation, all participants are using identical food blenders which have been centrally supplied after testing for contamination. For quality control of the analyses, six NIST SRMs covering a range of matrices with certified and reference values for the elements of interest have been distributed. A new Japanese reference diet material has also been developed. These quality assurance procedures are summarized here and new data are presented for Cs, I, Sr, Th and U in the NIST SRMs. (author)

  4. 29 CFR 37.64 - What procedures must the Director follow when CRC has completed a post-approval compliance review?

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true What procedures must the Director follow when CRC has completed a post-approval compliance review? 37.64 Section 37.64 Labor Office of the Secretary of Labor... (WIA) Compliance Procedures § 37.64 What procedures must the Director follow when CRC has completed a...

  5. Design iteration in construction projectsReview and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  6. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  7. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  8. Patient dose assessment in various Interventional radiology and cardiology procedures in Algeria (IAEA regional project results)

    International Nuclear Information System (INIS)

    Khelassi-Toutaoui, Nadia; Merad, Ahmed; Toutaoui, A.E.K.; Bairi, Souad

    2008-01-01

    Full text: Purpose: To evaluate patient doses in Interventional Radiology (IR) and Cardiology (IC) procedures in Algeria, within the framework of an International Atomic Energy Agency (IAEA) regional project on radiation protection of patients and medical exposure control (RAF 9033). Materials and Methods: Three public hospitals (CHU Bab el Oued, CHU Parnet and CHU Mustapha) and one specialised Cardiology Service (Clinique Maouche) were chosen for the study. For Maximum Skin Dose (MSD) evaluation, gafchromic films XR type R were used, placed on patient's back before the procedure. The Dose Area Product (DAP) and MSD were measured in 57 IR and IC procedures, either diagnostic or therapeutic. Results: The results revealed large variations in MSD (0.06-3.3 Gy) and DAP (5.5-332 mGycm 2 ). Mean MSD was 0.227 Gy in cerebral angiography, 0.202 Gy in coronary angiography, 1.162 Gy in Percutaneus Transluminal Coronary Angioplasty (PTCA) and 0.128 in abdominal angiography. The correlation of DAP and MSD was significant (r = 0.7). The correlation was DAP and fluoroscopy time was also significant (r = 0.8). Conclusion: The highest MSD values were found in PTCA which is a therapeutic procedure. Two PTCAs out of the 57 procedures measured in total had MSD over the threshold of 2 Gy for deterministic effects (MSD 1 = 3.0 Gy and MSD 2 3.3 Gy). The large variations in MSD reveal the need to continuously monitor patient doses in IR and IC procedures with special emphasis in PTCA procedure. (author)

  9. A procedure-specific systematic review and consensus recommendations for postoperative analgesia following total knee arthroplasty

    DEFF Research Database (Denmark)

    Fischer, H.B.; Simanski, C.J.; Sharp, C.

    2008-01-01

    The PROSPECT Working Group, a collaboration of anaesthetists and surgeons, conducts systematic reviews of postoperative pain management for different surgical procedures (http://www.postoppain.org). Evidence-based consensus recommendations for the effective management of postoperative pain are th...

  10. A review of environmental monitoring using solid state dosemeters, and guidelines for technical procedures

    International Nuclear Information System (INIS)

    Piesch, E.; Burgkhardt, B.

    1983-01-01

    The practical aspects of environmental programmes using thermoluminescence and photoluminescence dosemeter systems are reviewed. The review discusses developments in national and international standards, and discusses the optimisation of the read-out technique, routine calibration procedures and the treatment of random and systematic errors. The paper discusses the problems of measuring man-made dose contributions with low random errors, the estimation of this contribution being based on the interpretation of field results, taking into account the contribution of natural background radiation and of transit exposures. (author)

  11. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  12. Theories on Criminality and Mental Retardation Project CAMIO, Volume 2.

    Science.gov (United States)

    Haskins, Jimmy R.; Friel, Charles M.

    This historical review of theories on criminality and mental retardation is part of Project CAMIO (Correctional Administration and the Mentally Incompetent Offender), a Texas study to determine the incidence of criminal incarceration of the mentally retarded (MR) and to identify laws, procedures, and practices which affect the prosecution and…

  13. Quantization Procedures

    International Nuclear Information System (INIS)

    Cabrera, J. A.; Martin, R.

    1976-01-01

    We present in this work a review of the conventional quantization procedure, the proposed by I.E. Segal and a new quantization procedure similar to this one for use in non linear problems. We apply this quantization procedures to different potentials and we obtain the appropriate equations of motion. It is shown that for the linear case the three procedures exposed are equivalent but for the non linear cases we obtain different equations of motion and different energy spectra. (Author) 16 refs

  14. ERG [Engineering Review Group] review of the SRP [Salt Repository Project] salt irradiation effects program: Technical report

    International Nuclear Information System (INIS)

    Clark, D.E.

    1986-11-01

    The Engineering Review Group (ERG) was established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering-related issues in the US Department of Energy's nuclear waste repository program. The August 1985 meeting of the ERG reviewed the Salt Repository Project (SRP) salt irradiation effects program. This report documents the ERG's comments and recommendations on these subjects and the ONWI response to the specific points raised by the ERG

  15. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  16. The procedures used to review safety analysis reports for packagings submitted to the US Department of Energy for certification

    International Nuclear Information System (INIS)

    Popper, G.F.; Raske, D.T.; Turula, P.

    1988-01-01

    This paper presents an overview of the procedures used at the Argonne National Laboratory (ANL) to review Safety Analysis Reports for Packagings (SARPs) submitted to the US Department of Energy (DOE) for issuance of a Certificate of Compliance. Prior to certification and shipment of a packaging for the transport of radioactive materials, a SARP must be prepared describing the design, contents, analyses, testing, and safety features of the packaging. The SARP must be reviewed to ensure that the specific packaging meets all DOE orders and federal regulations for safe transport. The ANL SARP review group provides an independent review and evaluation function for the DOE to ensure that the packaging meets all the prescribed requirements. This review involves many disciplines and includes evaluating the general information, drawings, construction details, operating procedures, maintenance and test programs, and the quality assurance plan for compliance with requirements. 14 refs., 6 figs

  17. Effects of procurement on project performance:a survey of Swedish construction clients

    OpenAIRE

    Eriksson, Per-Erik; Vennström, Anders

    2009-01-01

    In order to increase the efficiency of the construction industry development and improvement of procurement procedures is vital. The purpose of this investigation is to increase the understanding of how procurement procedures affect project performance. A procurement model including eight hypotheses is first developed on the basis of a literature review and then tested through multivariate statistical techniques based on empirical data collected through a survey investigation of 106 Swedish c...

  18. THE NEGATIVE EFFECTS OF SOME COSMETIC PROCEDURES: PROTECTION POSSIBILITIES, MEDICAL AND PREVENTIVE AGENTS (REVIEW

    Directory of Open Access Journals (Sweden)

    A. V. Majorova

    2016-01-01

    Full Text Available The article describes the possible side responses on cosmetic procedures. There is a review of pharmaceutical and cosmeceutical agents for external use to treat and prevent the complications. We have described the reasonability of the external dosage forms use of anti-histaminic action.

  19. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  20. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project

    Science.gov (United States)

    2018-01-11

    Background: Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available e...

  1. Long-Term Memory: A Review and Meta-Analysis of Studies of Declarative and Procedural Memory in Specific Language Impairment

    Science.gov (United States)

    Lum, Jarrad A. G.; Conti-Ramsden, Gina

    2013-01-01

    This review examined the status of long-term memory systems in specific language impairment (SLI)--declarative memory and aspects of procedural memory in particular. Studies included in the review were identified following a systematic search of the literature and findings combined using meta-analysis. This review showed that individuals with SLI…

  2. The effect of vasodilatory medications on radial artery spasm in patients undergoing transradial coronary artery procedures: a systematic review.

    Science.gov (United States)

    Curtis, Elizabeth; Fernandez, Ritin; Lee, Astin

    2017-07-01

    The uptake of percutaneous coronary procedures via the radial artery has increased internationally due to the decreased risk of complications and increased patient satisfaction. The increased susceptibility of the radial artery to spasm however presents a potential risk for procedural failure. Although most experts agree on the need for prophylactic medications to reduce radial artery spasm, currently there is inconsistency in literature regarding the most effective vasodilatory medication or combination of medications. The objective of this study is to identify the effectiveness of vasodilatory medications on radial artery spasm in patients undergoing transradial coronary artery procedures. This review considered studies that included participants aged 18 years and over undergoing non-emergent transradial percutaneous coronary artery procedures. This review considered studies that used vasodilating intravenous and intra-arterial medications or combinations of medications prior to commencing and during transradial coronary approaches to reduce radial artery spasm. The outcomes of interest were the incidence of radial artery spasm during percutaneous coronary procedure using objective and/or subjective measures and its effect on the successful completion of the procedure. Randomized controlled trials published in the English language between 1989 to date were considered for inclusion. The search strategy aimed to find both published and unpublished studies. A three-step search strategy was utilized in this review. An initial search of MEDLINE, CINAHL and Scopus was undertaken, followed by a search for unpublished studies. Papers selected for retrieval were assessed by two independent reviewers for methodological validity prior to inclusion in the review using standardized critical appraisal instruments. Any disagreements that arose between the reviewers were resolved through discussion. Quantitative data was extracted from papers included in the review using the

  3. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  4. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  5. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  6. Vaginal and Laparoscopic hysterectomy as an outpatient procedure: A systematic review.

    Science.gov (United States)

    Dedden, Suzanne J; Geomini, Peggy M A J; Huirne, Judith A F; Bongers, Marlies Y

    2017-09-01

    Laparoscopic and vaginal hysterectomies are common gynaecological procedures. Same-day discharge is usual care in various gynaecological procedures like laparoscopic sterilisation and laparoscopic oophorectomies. In major procedures like vaginal or laparoscopic hysterectomy patients are usually admitted overnight. We systematically reviewed the literature to identify complications, risk factors for (re)admittance, financial consequences and patient satisfaction of same-day discharge after a vaginal or laparoscopic hysterectomy. We systematically searched PubMed, UptoDate, Embase, Cochrane and CINAHL database from inception until July 16th 2016. We selected randomized controlled trials, prospective and retrospective cohort studies assessing the safety and feasibility of same-day discharge after vaginal or laparoscopic hysterectomy. The outcome parameters that were assessed were admission rate, re-admission rate, minor and major complications, patient satisfaction and financial consequences. 27 articles were included in the systematic review. All studies provided data about the admission rate and therefore failure of same-day discharge. Eleven prospective studies were included which compromised a total of 2391 hysterectomies. The percentage of overnight admissions was median 9.3% [0-25%]. Eight retrospective studies, which screened their patients before undergoing an outpatient hysterectomy, showed in 1500 subjects a mean admission rate of 10% [4,4-64%]. Four retrospective studies, which considered a large total cohort of 142,799 hysterectomies had a mean admission rate of 59,7% [48-79%]. The overall re-admission rate was low, varying from 0.73-4.0%. Minor complications were reported in respectively 4,3% and 7,3% in prospective respectively retrospective trials. Major complications were described in 0.7%-3.6% of all cases. Generally high satisfaction rates were reported in the observational trials. Same-day discharge after laparoscopic and vaginal hysterectomy seems

  7. Department of Energy review of the National Spallation Neutron Source Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  8. Department of Energy review of the National Spallation Neutron Source Project

    International Nuclear Information System (INIS)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic

  9. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  10. Averaging models: parameters estimation with the R-Average procedure

    Directory of Open Access Journals (Sweden)

    S. Noventa

    2010-01-01

    Full Text Available The Functional Measurement approach, proposed within the theoretical framework of Information Integration Theory (Anderson, 1981, 1982, can be a useful multi-attribute analysis tool. Compared to the majority of statistical models, the averaging model can account for interaction effects without adding complexity. The R-Average method (Vidotto & Vicentini, 2007 can be used to estimate the parameters of these models. By the use of multiple information criteria in the model selection procedure, R-Average allows for the identification of the best subset of parameters that account for the data. After a review of the general method, we present an implementation of the procedure in the framework of R-project, followed by some experiments using a Monte Carlo method.

  11. 78 FR 38346 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-06-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act...

  12. Dispersant field testing : a review of procedures and considerations

    International Nuclear Information System (INIS)

    Fingas, M.F.

    2004-01-01

    The effectiveness of a dispersant is defined by the amount of oil that the dispersant puts into the water column compared to the amount of oil that was initially spilled. Effectiveness is generally determined visually in plumes of dispersed oil that are visible from ships and aircraft. This paper describes 25 specific issues and technical concerns regarding field testing of dispersant effectiveness. Recent field tests were reviewed and literature that relates to testing procedures was sited. The 25 factors that are important for the appropriate outcome of dispersant field experiments include: mass balance; proper controls; analytical method; differential plume movement; time lag and length of time followed; mathematics of calculation and integration; lower and upper limits of analytical methods; use of remote sensing; thickness measurement; behaviour of oil with surfactant content; surfactant stripping; tracking surface oil and dispersed oil; recovering surface oil; visibility of oil from the surface; background levels of hydrocarbons; fluorescence of dispersant; herding; emulsion breaking; application success; heterogeneity of slick and plume; deposition measurements; true analytical standards; effect of wind on dispersant and slick; dispersant run-off; and weathering of the oil. It was concluded that the most important factors are the ability to determine mass balance, use proper controls, analytical methods and to avoid procedures that give incorrect results. 34 refs., 4 tabs., 1 fig

  13. Nuclear emergency planning in Spain. The PLABEN review project

    International Nuclear Information System (INIS)

    Lentijo Lentijo, J. C.; Vila Pena, M.

    2002-01-01

    The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs

  14. The importance of a two-step impression procedure for complete denture fabrication: a systematic review of the literature.

    Science.gov (United States)

    Regis, R R; Alves, C C S; Rocha, S S M; Negreiros, W A; Freitas-Pontes, K M

    2016-10-01

    The literature has questioned the real need for some clinical and laboratory procedures considered essential for achieving better results for complete denture fabrication. The aim of this study was to review the current literature concerning the relevance of a two-step impression procedure to achieve better clinical results in fabricating conventional complete dentures. Through an electronic search strategy of the PubMed/MEDLINE database, randomised controlled clinical trials which compared complete denture fabrication in adults in which one or two steps of impressions occurred were identified. The selections were made by three independent reviewers. Among the 540 titles initially identified, four studies (seven published papers) reporting on 257 patients evaluating aspects such as oral health-related quality of life, patient satisfaction with dentures in use, masticatory performance and chewing ability, denture quality, direct and indirect costs were considered eligible. The quality of included studies was assessed according to the Cochrane guidelines. The clinical studies considered for this review suggest that a two-step impression procedure may not be mandatory for the success of conventional complete denture fabrication regarding a variety of clinical aspects of denture quality and patients' perceptions of the treatment. © 2016 John Wiley & Sons Ltd.

  15. Patient Dose Optimization in Fluoroscopically Guided Interventional Procedures. Final Report of a Coordinated Research Project

    International Nuclear Information System (INIS)

    2010-01-01

    In recent years, many surgical procedures have increasingly been replaced by interventional procedures that guide catheters into the arteries under X ray fluoroscopic guidance to perform a variety of operations such as ballooning, embolization, implantation of stents etc. The radiation exposure to patients and staff in such procedures is much higher than in simple radiographic examinations like X ray of chest or abdomen such that radiation induced skin injuries to patients and eye lens opacities among workers have been reported in the 1990's and after. Interventional procedures have grown both in frequency and importance during the last decade. This Coordinated Research Project (CRP) and TECDOC were developed within the International Atomic Energy Agency's (IAEA) framework of statutory responsibility to provide for the worldwide application of the standards for the protection of people against exposure to ionizing radiation. The CRP took place between 2003 and 2005 in six countries, with a view of optimizing the radiation protection of patients undergoing interventional procedures. The Fundamental Safety Principles and the International Basic Safety Standards for Protection against Ionizing Radiation (BSS) issued by the IAEA and co-sponsored by the Food and Agriculture Organization of the United Nations (FAO), the International Labour Organization (ILO), the World Health Organization (WHO), the Pan American Health Organization (PAHO) and the Nuclear Energy Agency (NEA), among others, require the radiation protection of patients undergoing medical exposures through justification of the procedures involved and through optimization. In keeping with its responsibility on the application of standards, the IAEA programme on Radiological Protection of Patients encourages the reduction of patient doses. To facilitate this, it has issued specific advice on the application of the BSS in the field of radiology in Safety Reports Series No. 39 and the three volumes on Radiation

  16. 76 FR 38183 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2011-06-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  17. 76 FR 11483 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2011-03-02

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  18. 78 FR 19268 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-03-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  19. 75 FR 78998 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  20. 78 FR 78965 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-12-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  1. 77 FR 40890 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2012-07-11

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  2. 77 FR 15761 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2012-03-16

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  3. 78 FR 732 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-01-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  4. 78 FR 78963 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-12-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  5. 78 FR 62635 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  6. 75 FR 39029 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2010-07-07

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  7. 76 FR 77235 - Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Subcommittee on Procedures Review, Advisory Board on Radiation and Worker Health (ABRWH), National Institute for Occupational Safety and Health (NIOSH) In accordance with section 10(a)(2) of the Federal Advisory Committee Act (Pub...

  8. Taking stock of project value creation: A structured literature review with future directions for research and practice

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per

    2016-01-01

    This paper aims to take stock of what we know about project value creation and to present future directions for research and practice. We performed an explorative and unstructured literature review, which was subsequently paired with a structured literature review. We join several research areas...... by adopting the project value creation perspective on literature relating to benefits, value, performance, and success in projects. Our review includes 111 contributions analyzed through both an inductive and deductive approach. We find that relevant literature dates back to the early 1980s, and the still...... developing value-centric view has been the subject of many publications in recent years. We contribute to research on project value creation through four directions for future research: rejuvenating value management through combining value, benefits, and costs; supplementing value creation with value capture...

  9. Cochrane Acute Respiratory Infections Group's Stakeholder Engagement Project identified systematic review priority areas.

    Science.gov (United States)

    Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris

    2018-05-22

    Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.

  10. 76 FR 64991 - Environmental Assessment for the I-395 Air Rights Project

    Science.gov (United States)

    2011-10-19

    ... FHWA Environmental Impact and Related Procedures. The project is also being reviewed under Section 106... copies of the EA may also be viewed at the following locations: Federal Highway Administration (FHWA.... Martin Luther King, Jr. Memorial Library, 901 G Street, NW., Washington, DC 20001. Walker Jones Education...

  11. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  12. Off-site radiation exposure review project: computer-aided surface interpolation and graphical display

    International Nuclear Information System (INIS)

    Foley, T.A. Jr.

    1981-08-01

    This report presents the implementation of an iterative procedure that solves the following bivariate interpolation problem: Given N distinct points in the plane (x/sub i/, y/sub i/) and N real numbers Z/sub i/, construct a function F(x,y) that satisfies F(x/sub i/, y/sub i/) = Z/sub i/, for i = 1, ..., N. This problem can be interpreted as fitting a surface through N points in three dimensional space. The application of primary concern to the Offsite Radiation Exposure Review Project is the characterization of the radionuclide activity resulting from nuclear tests. Samples of activity were measured at various locations. The location of the sample point is represented by (x/sub i/, y/sub i/), and the magnitude of the reading is represented by Z/sub i/. The method presented in this report is constructed to be efficient on large data sets, stable on the large variations of the Z/sub i/ magnitudes, and capable of smoothly filling in areas that are void of data. This globally defined icode was initiateminednitial shock but to two later eriological invaders are Staphylococcus albus, Beta-hemolytic Streptococcus e to the same general semiclassical treatment

  13. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    International Nuclear Information System (INIS)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland

  14. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland.

  15. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  16. Evaluation of the existing EIA legislation. How EIA procedures function in practice and areas needing improvement; YVA-lainsaeaedaennoen toimivuusarviointi. Ympaeristoevaikutusten arviointimenettelyn toimivuus ja kehittaemistarpeet

    Energy Technology Data Exchange (ETDEWEB)

    Jantunen, J.; Hokkanen, P.

    2010-09-15

    The evaluation reviewed how the EIA legislation and EIA procedure are functioning in actual practice, as well as the realisation of the goals of the Act on Environmental Impact Assessment Procedure. The evaluation also reviewed the role of the EIA procedure in project planning and decision-making, and the relationship between the EIA legislation and other legislation. The goal of the evaluation was to describe the current status of the legislation and its functioning in practice, and generate information on opportunities for further development of environmental impact assessment and EIA legislation. Through the application of diverse and extensive materials and consideration of various viewpoints, a comprehensive review of the strengths of the existing EIA legislation and procedure was carried out and areas needing further improvement were identified. A broad interpretation of functioning was used in the evaluation: it includes the effectiveness and practice of the EIA procedure, the acceptability of the EIA legislation and also how the legislation implements EU legislation. Overall, the goals of the EIA legislation have been reached successfully. The EIA legislation is successful in implementing EU legislation, and, as shown by the results of the evaluation, the choices made in Finland appear to be correct. Stakeholders have come to understand the role the EIA procedure plays in guiding activities and the scope of the current EIA legislation, which is under no pressure for major amendments. The project types that are subject to the EIA procedure are markedly different from each other, resulting in an EIA being implemented in widely different planning and decision-making situations. The performance of the EIA procedure, therefore, varies somewhat from one project type to another. It is important that the EIA legislation be flexible and easily adapted to various situations. The assessment procedure seem to be most effective when it is used early enough as a project

  17. Academic and Institutional Review Board Collaboration to Ensure Ethical Conduct of Doctor of Nursing Practice Projects.

    Science.gov (United States)

    Foote, Jan M; Conley, Virginia; Williams, Janet K; McCarthy, Ann Marie; Countryman, Michele

    2015-07-01

    Navigating the regulations to protect human subjects and private health information for Doctor of Nursing Practice (DNP) projects can be a formidable task for students, faculty, and the institutional review board (IRB). Key stakeholders from the University of Iowa College of Nursing and the Human Subjects Office developed a standardized process for DNP students to follow, using a decision algorithm, a student orientation to the human subjects review process conducted by faculty and IRB chairs and staff, and a brief Human Subjects Research Determination form. Over 2 years, 109 students completed the process, and 96.3% of their projects were deemed not to be human subjects research. Every student submitted documentation of adherence to the standardized process. Less time was spent by students, faculty, and the IRB in preparing and processing review requests. The interprofessional collaboration resulted in a streamlined process for the timely review of DNP projects. Copyright 2015, SLACK Incorporated.

  18. Motor assessment instruments and psychometric procedures: A systematic review

    Directory of Open Access Journals (Sweden)

    Pâmella de Medeiros

    2017-03-01

    Full Text Available It was our objective to identify the psychometric elements to an epistemological reflection through a systematic review of cross-cultural validation procedures of TGMD-2 batteries, MABC-2 and KTK. Searches were carried out by two evaluators independently without year and language restrictions in six databases: Web of Science, Science Direct, Lilacs, Scopus, Pubmed and The ScientificElectronic Library Online - SciELO. The key words used were: "MABC", "TGMD" and "KTK" all of them combined with the word "validity". There was a total of 734 articles, of which, after the exclusion criteria, remained only 11 studies. It was found that there are differences between the authors in relation to the psychometric factors taken into account in cross-cultural validation. So that there was a lack of unanimity of the validation criteria of all studies in this field.

  19. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  20. Enhancement and creation of secondary channel habitat: Review of project performance across a range of project types and settings

    Science.gov (United States)

    Epstein, J.; Lind, P.

    2017-12-01

    Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons

  1. The effect of economic downturn on the volume of surgical procedures: A systematic review.

    Science.gov (United States)

    Fujihara, Nasa; Lark, Meghan E; Fujihara, Yuki; Chung, Kevin C

    2017-08-01

    Economic downturn can have a wide range of effects on medicine at both individual and national levels. We aim to describe these effects in relation to surgical volume to guide future planning for physician specialization, patient expectations in the face of economic crises, or estimating healthcare expenditure. We hypothesized that because of high out-of-pocket costs, cosmetic procedure volumes would be most affected by economic decline. A systematic review was conducted using MEDLINE, Embase, and ABI/INFORMS. The main search terms were "economic recession" and "surgical procedures, operative". Studies were included if surgical volumes were measured and economic indicators were used as predictors of economic conditions. Twelve studies were included, and the most common subject was cosmetic (n = 5), followed by orthopedic (n = 2) and cardiac surgeries (n = 2). The majority of studies found that in periods of economic downturn, surgical volume decreased. Among the eight studies using Pearson's correlation analysis, there were no significant differences between cosmetic procedures and other elective procedures, indicating that cosmetic procedures may display trends similar to those of non-cosmetic elective procedures in periods of economic downturn. Surgical volume generally decreased when economic indicators declined, observed for both elective and non-elective surgery fields. However, a few specific procedure volumes such as vasectomy and caesarean section for male babies increased during the economic downturn. Knowledge of these trends can be useful for future surgical planning and distribution of healthcare resources. Copyright © 2017 IJS Publishing Group Ltd. Published by Elsevier Ltd. All rights reserved.

  2. "Compacted" procedures for adults' simple addition: A review and critique of the evidence.

    Science.gov (United States)

    Chen, Yalin; Campbell, Jamie I D

    2018-04-01

    We review recent empirical findings and arguments proffered as evidence that educated adults solve elementary addition problems (3 + 2, 4 + 1) using so-called compacted procedures (e.g., unconscious, automatic counting); a conclusion that could have significant pedagogical implications. We begin with the large-sample experiment reported by Uittenhove, Thevenot and Barrouillet (2016, Cognition, 146, 289-303), which tested 90 adults on the 81 single-digit addition problems from 1 + 1 to 9 + 9. They identified the 12 very-small addition problems with different operands both ≤ 4 (e.g., 4 + 3) as a distinct subgroup of problems solved by unconscious, automatic counting: These items yielded a near-perfectly linear increase in answer response time (RT) yoked to the sum of the operands. Using the data reported in the article, however, we show that there are clear violations of the sum-counting model's predictions among the very-small addition problems, and that there is no real RT boundary associated with addends ≤4. Furthermore, we show that a well-known associative retrieval model of addition facts-the network interference theory (Campbell, 1995)-predicts the results observed for these problems with high precision. We also review the other types of evidence adduced for the compacted procedure theory of simple addition and conclude that these findings are unconvincing in their own right and only distantly consistent with automatic counting. We conclude that the cumulative evidence for fast compacted procedures for adults' simple addition does not justify revision of the long-standing assumption that direct memory retrieval is ultimately the most efficient process of simple addition for nonzero problems, let alone sufficient to recommend significant changes to basic addition pedagogy.

  3. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    Science.gov (United States)

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation

  4. Review of experiments and calculation procedures for ship collision and grounding damage

    DEFF Research Database (Denmark)

    Liu, Bin; Pedersen, Preben Terndrup; Zhu, Ling

    2018-01-01

    Abstract The paper presents a review of experiments and calculation procedures for the resistances of ship structural components subjected to impact loadings. The purpose of the paper is to highlight the importance of large-scale collision and grounding experiments and to discuss the technical...... and material characteristics. In recent literature, analytical and numerical calculations provide relatively accurate prediction of the purely plastic responses of ship structures under impact loads, but universal approaches have not been found for fracture predictions. The existing formulae for failure...

  5. Surface Environmental Surveillance Procedures Manual

    International Nuclear Information System (INIS)

    Hanf, Robert W.; Poston, Ted M.

    2000-01-01

    Shows and explains certain procedures needed for surface environmental surveillance. Hanford Site environmental surveillance is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) under the Surface Environmental Surveillance Project (SESP). The basic requirements for site surveillance are set fourth in DOE Order 5400.1, General Environmental Protection Program Requirements. Guidance for the SESP is provided in DOE Order 5484.1, Environmental Protection, Safety, and Health Protection Information Reporting Requirements and DOE Order 5400.5, Radiation Protection of the Public and Environment. Guidelines for environmental surveillance activities are provided in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. An environmental monitoring plan for the Hanford Site is outlined in DOE/RL 91-50 Rev. 2, Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual. Personnel training requirements are documented in SESP-TP-01 Rev.2, Surface Environmental Surveillance Project Training Program.

  6. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  7. Tools for PSA reviews

    International Nuclear Information System (INIS)

    Linden, J. von

    1998-01-01

    It is desirable to have a uniform and competent procedure for the review of PSAs which are performed within the framework of the Periodic Safety Review of German Nuclear Power Plants. Guidelines for the review process should therefore be evaluated within task A. 1 of project SR 2096. The basis for this work is the experience and knowledge within GRS derived from PSA-related work and from several review projects as well as the German PSA Guide with its appendices. Furthermore, the review processes in the USA, Switzerland and Sweden and the Guidelines for the International Peer Review Service (IPERS Guidelines) were utilized. As a result, recommendations are given for the review process, with individual recommendations concerning the organization of the review, task allocation between the reviewers, interface problems, assessment criteria, the scope and depth of the review as well as the supporting documents. An additional result are checklists for the technical elements of the PSA, which are listed to facilicate the review work. It is not the intention of this report to work out complete review guidelines. Its aims is rather more to give recommondations and support for the review in addition to what can be derived from the existing documents that should be used for the review. The recommendations reflect the view of GRS and go beyond the statements given in the German PSA Guide (Leitfaden Probabilistische Sicherheitsanalyse /PSUe97/) in some points. (orig.) [de

  8. End user orientation of TC projects. Special evaluation review

    International Nuclear Information System (INIS)

    1996-12-01

    The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs

  9. Green Port / Eco Port Project - Applications and Procedures in Turkey

    Science.gov (United States)

    Akgul, Burak

    2017-12-01

    As being the heartlands of international trade, sea ports are the junction points of land and sea routes. The growth of global trade has led to the development of number and capacity as well as the service quality of ports. The policies and procedures applied during construction, operation and development of ports under development with environmental considerations scope has evolved in accordance with the needs of global trends. Although maritime transportation provides the most ecofriendly transportation method, the reduction of potential environmental threats and continuous improvement of ports and their vicinity is paramount from environmental concerns with regards to the international environmental standards. In the context of the study, national and international legal regulations governing the control of the environmental impacts of the activity groups causing pollution in Turkey based sea ports were viewed. In addition, the models applied during the measurement and documentation of environmental impacts were investigated. The most important aspects in terms of the effectiveness of the environmental management models are legal regulations. However, the standards applied at the ports without any legal obligation, such as EcoPorts applications, ISO 14001 standard, and the EMAS (Eco-Management and Audit Scheme) were sought in the scope of the study. The boundaries of the study were determined as the EU based Environmental Management Systems and the Green Port/Eco Port Project which is being administered by the Turkish Ministry of Transport, Maritime and Communication. “Marport”, which is Turkey’s first certified Green Port / Eco Port is designated as the experimental study site. In addition, the provisions in the ports of ESPO member countries are approached in order to compare the effectiveness and applicability of Green Port / Eco Port Project.

  10. THE FEATURES OF THE PROCEDURE FOR MAKING THE DECISION ON THE IMPLEMENTATION OF PROJECTS THE PUBLIC-PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    M. Vorobiova

    2018-01-01

    Full Text Available The procedure for making a decision on the implementation of public-private partnership, which has developed in Ukraine was examined in the article. Three consecutive stages of preparation for the implementation of projects of partnership between the state and business were сomprehensively considered. The main disadvantages of each stage were determined and suggestions for their improvement were given.

  11. Perceptions, experiences and preferences of patients receiving a clinician's touch during intimate care and procedures: a qualitative systematic review.

    Science.gov (United States)

    O'Lynn, Chad; Cooper, Adam; Blackwell, Lisa

    2017-11-01

    Clinical practice frequently involves the practitioner touching patients' bodies in areas that are highly personal. If inappropriately performed, such intimate touch may result in much anxiety, confusion and misinterpretation. Examination of evidence is necessary to guide practice in this area to mitigate risks and foster optimal clinician-patient relations and care. The objective of this qualitative systematic review was to identify and synthesize findings on the perceptions, experiences and preferences of patients receiving a clinician's touch during intimate care and procedures INCLUSION CRITERIA TYPES OF PARTICIPANTS: The current review considered studies that included patients who had received a clinician's touch during intimate care and procedures. The current review considered qualitative studies that evaluated patients' perceptions, experiences and preferences of a clinician's touch during intimate care and procedures. The current review considered studies that collected qualitative data and included studies using designs such as phenomenology, grounded theory, ethnography, action research, qualitative description, focus group methodology and feminist research. In the absence of research studies, other text such as opinion papers and reports were considered. The current review considered studies that included patients' perceptions, experiences and preferences of a clinician's touch during intimate care and procedures. Intimate care is likely to occur in any clinical setting where patients need assistance with personal care, where physical examinations occur, or in settings were gynecologic, genitourinary, lower intestinal, dermatologic, cardiac or other procedures involving highly personal areas of the body are performed. A three-step search strategy was used to find published and unpublished studies in English from 1970 to 2016, searching various databases which included searches of reference lists of studies selected for appraisal. Included studies were

  12. Procedural Influence on Internal and External Assessment Scores of Undergraduate Vocational and Technical Education Research Projects in Nigerian Universities

    Science.gov (United States)

    A. C., John; Manabete, S. S.

    2015-01-01

    This study sought to determine the procedural influence on internal and external assessment scores of undergraduate research projects in vocational and technical education programmes in the university under study. A survey research design was used for the conduct of this study. The population consisted of 130 lecturers and 1,847 students in the…

  13. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 1. Project Reviews A-F

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume contains project reviews arranged alphabetically from A to F

  14. Pep-up: A review of the Umgeni Valley Project evaulation process ...

    African Journals Online (AJOL)

    Pep-up: A review of the Umgeni Valley Project evaulation process. Tim Wright. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  15. Review of induced seismic hazard for Hot Dry Rock Project, Rosemanowes, Cornwall

    International Nuclear Information System (INIS)

    Skipp, B.O.; Woo, G.; Eldred, P.J.L.

    1991-01-01

    Geothermal energy installations perturb the earth's crust and so may provoke earthquakes. The 21st Dry Rock (HDR) Geothermal Project at Rosemanowes Quarry in Cornwall has given rise to low level unfelt acoustic emission and possibly small, felt earthquakes. This review of induced seismic hazard study examines the effects that the HDR Project could have on seismic events. Events which are modified by the project, in magnitude and time of occurrence, as well as those which might not have occurred at all were studied. From an examination of the literature and relevant seismicity models, a broad estimate of induced seismic hazard was established. (U.K)

  16. Overview of radiation protection programme in nuclear medicine facility for diagnostic procedures

    International Nuclear Information System (INIS)

    Ahmed, Ezzeldein Mohammed Nour Mohammed

    2015-02-01

    This project was conducted to review Radiation Protection Program in Nuclear Medicine facility for diagnostic procedures which will provide guide for meeting the standard and regulatory requirements in diagnostic nuclear medicine. The main objective of this project is to keep dose to staff, patient and public as low as reasonably achievable (ALARA). The specific objectives were to review the Radiation Protection Program (RPP) in diagnostic nuclear medicine and to make some recommendation for improving the level of radiation protection in diagnostic nuclear medicine that will help to control normal exposure and prevent or mitigate potential exposure. The methodology used is review of various documents. The review showed that if the Radiation Protection Program is inadequate it leads to unjustified exposure to radiation. Finally, this study stated some recommendations that if implemented could improve the level of radiation protection in nuclear medicine department. One of the most important recommendations is that a qualified Radiation Protection Officer (RPO) should be appointed to lay down and oversee a radiation protection in the nuclear medicine department. The RPO must be given the full authority and the adequate time to enable him to perform his duties effectively. (au)

  17. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  18. Review: Janice M. Morse & Linda Niehaus (2009). Mixed Method Design: Principles and Procedures

    OpenAIRE

    Öhlen, Joakim

    2010-01-01

    Mixed method design related to the use of a combination of methods, usually quantitative and qualitative, is increasingly used for the investigation of complex phenomena. This review discusses the book, "Mixed Method Design: Principles and Procedures," by Janice M. MORSE and Linda NIEHAUS. A distinctive feature of their approach is the consideration of mixed methods design out of a core and a supplemental component. In order to define these components they emphasize the overall conceptual dir...

  19. Procedures in child deaths in The Netherlands: a comparison with child death review

    OpenAIRE

    Knoeff-Gijzen, Sandra; Petter, Jessica; L'Hoir, Monique P.; Boere-Boonekamp, Magdalena M.; Need, Ariana

    2017-01-01

    Aim: Child Death Review (CDR) is a method in which every child death is systematically and multidisciplinary examined to (1) improve death statistics, (2) identify factors that give direction for prevention, (3) translate the results into possible interventions, and (4) support families. The aim of this study was to determine to what extent procedures of organizations involved in the (health) care for children in The Netherlands cover these four objectives of CDR. Subject and methods: Organiz...

  20. The urgent need for universally applicable simple screening procedures and diagnostic criteria for gestational diabetes mellitus – lessons from projects funded by the World Diabetes Foundation

    Directory of Open Access Journals (Sweden)

    Maximilian de Courten

    2012-07-01

    Full Text Available Background: To address the risks of adverse pregnancy outcomes and future type 2 diabetes associated with gestational diabetes mellitus (GDM, its early detection and timely treatment is essential. In the absence of an international consensus, multiple different guidelines on screening and diagnosis of GDM have existed for a long time. This may be changing with the publication of the recommendations by the International Association of Diabetes and Pregnancy Study Groups. However, none of these guidelines take into account evidence from or ground realities of resource-poor settings. Objective: This study aimed to investigate whether GDM projects supported by the World Diabetes Foundation in developing countries utilize any of the internationally recommended guidelines for screening and diagnosis of GDM, explore experiences on applicability and usefulness of the guidelines and barriers if any, in implementing the guidelines. These projects have reached out to thousands of pregnant women through capacity building and improvement of access to GDM screening and diagnosis in the developing world and therefore provide a rich field experience on the applicability of the guidelines in resource-poor settings. Design: A mixed methods approach using questionnaires and interviews was utilised to review 11 GDM projects. Two projects were conducted by the same partner; interviews were conducted in person or via phone by the first author with nine project partners and one responded via email. The interviews were analysed using content analysis. Results: The projects use seven different screening procedures and diagnostic criteria and many do not completely adhere to one guideline alone. Various challenges in adhering to the recommendations emerged in the interviews, including problems with screening women during the recommended time period, applicability of some of the listed risk factors used for (pre-screening, difficulties with reaching women for testing in

  1. Delayed manifestation of bilateral scleral thinning after I-BRITE® procedure and review of literature for cosmetic eye-whitening procedures

    Science.gov (United States)

    Moshirfar, Majid; McCaughey, Michael V; Fenzl, Carlton R; Santiago-Caban, Luis; Kramer, Gregory D; Mamalis, Nick

    2015-01-01

    Purpose To report a case of delayed-onset bilateral scleral thinning and calcium deposition following a cosmetic ocular-whitening procedure (I-BRITE®). Methods A 33-year-old male patient with a history of right-sided ptosis repair and left-sided anterior uveitis had previously undergone bilateral I-BRITE treatment for chronic conjunctival hyperemia. Four years after the procedure, the patient was referred to our institution with bilateral scleral thinning and overlying calcific depositions. A literature review was performed through PubMed from 1980 through 2014 using the search terms ‘cosmetic’, ‘ocular’, ‘conjunctivectomy’, ‘regional conjunctivectomy’, ‘I-BRITE’, ‘eye-whitening’, ‘scleritis’, ‘necrotizing scleritis’, ‘anterior uveitis’, ‘mitomycin C’, ‘5-fluorouracil’, and ‘bevacizumab’, along with associated cross-referencing from relevant articles. Results Examination of the patient revealed bilateral necrotizing scleritis within the nasal region of both eyes. Calcified plaques were also present within the areas of scleromalacia, along with epithelial defects demonstrated with fluorescein staining. Although evidence of previous intraocular inflammation was apparent within the left eye, there were no active signs of inflammation evident within either eye on initial presentation. Complication rates reported in the literature include: scleral thinning (1.8%), calcific plaque formation (2.9%), fibrovascular proliferation (13%), diplopia (1.2%), elevation of intraocular pressure (4.2%), and recurrence of conjunctival hyperemia (2.1%). Conclusion Cosmetic ocular whitening procedures have an attendant high complication rate, and have been associated with several adverse postoperative complications, which have in turn generated several reservations regarding the veritable benefit of the procedure. Many postsurgical complications may demonstrate delayed apparition, varying from several months to several years after primary

  2. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  3. A Holistic Approach to Antiaging as an Adjunct to Antiaging Procedures: A Review of the Literature.

    Science.gov (United States)

    Saluja, Sandeep S; Fabi, Sabrina G

    2017-04-01

    Aging is a multifactorial process and depends on both intrinsic and extrinsic factors. Procedural options for diminishing signs of intrinsic aging and cosmetic rejuvenation have expanded dramatically. However, less attention is paid to counseling patients on options for mitigating extrinsic factors related to aging. The objective of this study was to review changes that occur with intrinsic and extrinsic aging, and provide evidence-based holistic counseling recommendations that can be used synergistically with aesthetic procedures to maximize antiaging interventions. A PubMed search was conducted for articles on intrinsic and extrinsic aging as it relates to skin, fat, muscle, and bone. Key clinical trials and studies on the effect of diet, hormones, exercise, sleep, stress, dental hygiene, smoking, pollution, and oxidative stress on the aging process are reviewed, and treatment recommendations are summarized based on available evidence. Conventional cosmetic procedures and cosmeceuticals work together with nutritious diet, exercise, dental hygiene, hormonal balance, stress reduction, smoking and pollution avoidance, and healthy sleep patterns for a better effect on antiaging. A combination approach of multiple nonsurgical modalities along with healthy lifestyle recommendations to minimize intrinsic and extrinsic aging factors allows cosmetic practitioners to target multiple facets of aging concurrently and maximize the aesthetic interventions cosmetic dermatologists/practitioners provide.

  4. Dedicated OO expertise applied to Run II software projects

    International Nuclear Information System (INIS)

    Amidei, D.

    2000-01-01

    The change in software language and methodology by CDF and D0 to object-oriented from procedural Fortran is significant. Both experiments requested dedicated expertise that could be applied to software design, coding, advice and review. The Fermilab Run II offline computing outside review panel agreed strongly with the request and recommended that the Fermilab Computing Division hire dedicated OO expertise for the CDF/D0/Computing Division joint project effort. This was done and the two experts have been an invaluable addition to the CDF and D0 upgrade software projects and to the Computing Division in general. These experts have encouraged common approaches and increased the overall quality of the upgrade software. Advice on OO techniques and specific advice on C++ coding has been used. Recently a set of software reviews has been accomplished. This has been a very successful instance of a targeted application of computing expertise, and constitutes a very interesting study of how to move toward modern computing methodologies in HEP

  5. Ischemic Conditioning as a Hemostatic Intervention in Surgery and Cardiac Procedures: A Systematic Review

    DEFF Research Database (Denmark)

    Krag, Andreas Engel; Hvas, Anne-Mette

    2017-01-01

    did not increase operative bleeding. In conclusion, ischemic conditioning reduced platelet activity without increasing the risk of bleeding in patients undergoing surgery or cardiac procedures. Limited evidence supports the proposal that ischemic conditioning reduces the incidence of arterial......Ischemic conditioning induced by nonlethal cycles of tissue ischemia and reperfusion attenuates ischemia–reperfusion injury. The objective of this study is to systematically review the effects of local and remote ischemic conditioning on laboratory parameters of hemostasis and the clinical outcomes......, thromboembolism, and bleeding were extracted for qualitative synthesis. In total, 69 studies were included; of these, 53 were randomized controlled trials (RCTs) and 11 were meta-analyses. Local and remote ischemic conditioning reduced platelet activation in patients undergoing cardiac procedures. Local ischemic...

  6. Proposal of organisation and ALARA procedures for maintenance site: application to replacement of steam generator; Propositions d'organisation et procedures ALARA pour la preparation des chantiers de maintenance: application au RGV

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, J; Lefaure, C

    1989-08-01

    This report proposes generic organization and ALARA procedures for preparing a maintenance site at a NPP. After a short description of the ALARA principle, it describes the proposition for French sites. They are grouped according to the following: motivation, organisation, means. They are illustrated by the example of steam generator replacement. Three special points concerning preparation of the site are developed: education; training of operators; review of the project.

  7. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Science.gov (United States)

    2010-10-01

    ... Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to..., App. Appendix to Subpart G of Part 124—Interim Procedures and Criteria for Review by Health Systems... section 1625 of the Act, health systems agencies shall use the procedures and criteria stated below. A...

  8. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  9. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  10. Demonstrating sustainable energy: A review-based model of sustainable energy demonstration projects

    NARCIS (Netherlands)

    Bossink, Bart

    2017-01-01

    This article develops a model of sustainable energy demonstration projects, based on a review of 229 scientific publications on demonstrations in renewable and sustainable energy. The model addresses the basic organizational characteristics (aim, cooperative form, and physical location) and learning

  11. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  12. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  13. Implementation of procedures to NPP Krsko INTRANEK

    International Nuclear Information System (INIS)

    Gradisar, D.; Krajnc, M.; Kocnar, R.; Spiler, J.

    1999-01-01

    Part of NEK documentation has already been presented on NEK Intranet such as USAR, Technical Specifications, QA Plan as well as some frequently used series of drawings. At the time being the process of presentation of all procedures (thereinafter INTRANEK procedures) is in progress. The purpose of this project is the presentation of 1600 procedures with average size of 30 pages what is more than 48000 pages altogether. ADOBE PDF (Portable Document Format) has been chosen as the most suitable format for the presentation of procedures on INTRANEK. PDF format meets the following criteria: the outlook of a document page is always the same as an original one and cannot be changed without control. In addition to this, full text search is available as well as easy jump from procedure to procedure. Some changes of working process on internal procedures have to be made before the project start, which determine the responsibility of individual users in the process. The work flow, which enables easy daily maintenance, has been prepared, the rules of both procedure numbering as well as folder contents/name have been set and the server selected. The project was managed and implemented with the extensive use of compute-aided management, document distribution and control, databases, electronics mail and Intranet tools. The results of practical implementation of NEK procedures and our experience with INTRANEK are presented in this paper.(author)

  14. Delayed manifestation of bilateral scleral thinning after I-BRITE(®) procedure and review of literature for cosmetic eye-whitening procedures.

    Science.gov (United States)

    Moshirfar, Majid; McCaughey, Michael V; Fenzl, Carlton R; Santiago-Caban, Luis; Kramer, Gregory D; Mamalis, Nick

    2015-01-01

    To report a case of delayed-onset bilateral scleral thinning and calcium deposition following a cosmetic ocular-whitening procedure (I-BRITE(®)). A 33-year-old male patient with a history of right-sided ptosis repair and left-sided anterior uveitis had previously undergone bilateral I-BRITE treatment for chronic conjunctival hyperemia. Four years after the procedure, the patient was referred to our institution with bilateral scleral thinning and overlying calcific depositions. A literature review was performed through PubMed from 1980 through 2014 using the search terms 'cosmetic', 'ocular', 'conjunctivectomy', 'regional conjunctivectomy', 'I-BRITE', 'eye-whitening', 'scleritis', 'necrotizing scleritis', 'anterior uveitis', 'mitomycin C', '5-fluorouracil', and 'bevacizumab', along with associated cross-referencing from relevant articles. Examination of the patient revealed bilateral necrotizing scleritis within the nasal region of both eyes. Calcified plaques were also present within the areas of scleromalacia, along with epithelial defects demonstrated with fluorescein staining. Although evidence of previous intraocular inflammation was apparent within the left eye, there were no active signs of inflammation evident within either eye on initial presentation. Complication rates reported in the literature include: scleral thinning (1.8%), calcific plaque formation (2.9%), fibrovascular proliferation (13%), diplopia (1.2%), elevation of intraocular pressure (4.2%), and recurrence of conjunctival hyperemia (2.1%). Cosmetic ocular whitening procedures have an attendant high complication rate, and have been associated with several adverse postoperative complications, which have in turn generated several reservations regarding the veritable benefit of the procedure. Many postsurgical complications may demonstrate delayed apparition, varying from several months to several years after primary surgical intervention as in the case reported here.

  15. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  16. Project for review of nuclear energy in the Netherlands

    International Nuclear Information System (INIS)

    Jong, J.J. de

    1988-03-01

    In consequence of the accident national as well as international activities have been undertaken, in particular in the areas of reactor safety and environmental impacts. The international activities were concentrated at IAEA in Vienna, NEA in Paris and the EG. Nationally regarded the accident has induced the project Review and the working plan for rounding-off Chernobylsk. In general it could be noted that one has learned lessons from the accident in the areas of reactor safety and environmental impacts. 22 refs

  17. Feeling lonely in the lab: A literature review and partial examination of recent loneliness induction procedures for experiments

    Directory of Open Access Journals (Sweden)

    Pels Fabian

    2017-01-01

    Full Text Available Few laboratory experiments have been conducted in loneliness research in the past. Therefore, the purpose of this article is to review, partially investigate and discuss loneliness induction procedures in order to facilitate future laboratory experiments in loneliness research (e.g. to examine the link between loneliness and social cognition. Previous studies have found both unconscious (i.e. professional hypnosis and conscious (i.e. recalling and calling out lonely experiences procedures to be successful in inducing loneliness. Another conscious procedure (i.e. recalling and writing down lonely experiences that has been described in recent literature has not yet been examined. Therefore, the present study aimed to examine this procedure using a one-group before-after design. However, this procedure, in which the participants had to recall and write down two lonely situations, was not found to significantly induce loneliness. Of 16 participants, only three reported at least some higher feelings of loneliness following this procedure.

  18. Systematic review of "filling" procedures for lip augmentation regarding types of material, outcomes and complications.

    Science.gov (United States)

    San Miguel Moragas, Joan; Reddy, Rajgopal R; Hernández Alfaro, Federico; Mommaerts, Maurice Y

    2015-07-01

    The ideal lip augmentation technique provides the longest period of efficacy, lowest complication rate, and best aesthetic results. A myriad of techniques have been described for lip augmentation, but the optimal approach has not yet been established. This systematic review with meta-regression will focus on the various filling procedures for lip augmentation (FPLA), with the goal of determining the optimal approach. A systematic search for all English, French, Spanish, German, Italian, Portuguese and Dutch language studies involving FPLA was performed using these databases: Elsevier Science Direct, PubMed, Highwire Press, Springer Standard Collection, SAGE, DOAJ, Sweetswise, Free E-Journals, Ovid Lippincott Williams & Wilkins, Willey Online Library Journals, and Cochrane Plus. The reference section of every study selected through this database search was subsequently examined to identify additional relevant studies. The database search yielded 29 studies. Nine more studies were retrieved from the reference sections of these 29 studies. The level of evidence ratings of these 38 studies were as follows: level Ib, four studies; level IIb, four studies; level IIIb, one study; and level IV, 29 studies. Ten studies were prospective. This systematic review sought to highlight all the quality data currently available regarding FPLA. Because of the considerable diversity of procedures, no definitive comparisons or conclusions were possible. Additional prospective studies and clinical trials are required to more conclusively determine the most appropriate approach for this procedure. IV. Copyright © 2015 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  19. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  20. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  1. UMTRA water sampling technical (peer) review. Responses to observations, comments, and recommendations submitted by C. Warren Ankerberg (Geraghty ampersand Miller, Inc.)

    International Nuclear Information System (INIS)

    1993-08-01

    At the request of the Office of Independent Technical Review for the U.S. Department of Energy (DOE), Uranium Mill Tailings Remedial Action (UMTRA) Project, an independent technical review (peer review) was conducted during the period of September 15-17, 1992. The review was conducted by C. Warren Ankerberg (Geraghty ampersand Miller, Inc., Tampa, Florida) and Don Messinger (Roy F. Weston, Inc., West Chester, Pennsylvania). The peer review included a review of written documentation [water sampling standard operating procedures (SOP)], an inspection of technical reports and other deliverables, a review of staff qualifications and training, and a field visit to evaluate the compliance of field procedures with SOPs. The approach of the peer reviewers was to verify that the program meets the following criteria: Reported results are traceable to and consistent with recorded data. The basic assumptions and acceptance criteria are valid. Data are traceable to their origin and to reported analytical results. The procedures employed are consistent both internally and externally with written SOPs and regulatory guidelines. Inferences and conclusions are soundly based. The procedures and/or reports generated present work that satisfies the local, state and/or Federal regulatory requirements as applicable. The approach is consistent with industry standards and/or state-of-the-art technology, as practical. The data generated by activities are legally defensible and technically sound. UMTRA staff are adequately trained and qualified for the work. This document is a response to the observations, comments, and recommendations submitted by C. Warren Ankerberg following his review. The format of this document is to present the findings and recommendations verbatim from Mr. Ankerberg's report, followed by responses from the UMTRA Project staff. Included in the responses from the UMTRA Project staff are recommended changes in SOPs and strategies for implementing the changes

  2. Practical implications of procedures developed in IDEA project - Comparison with traditional methods

    International Nuclear Information System (INIS)

    Andrasi, A.; Bouvier, C.; Brandl, A.; De Carlan, L.; Fischer, H.; Franck, D.; Hoellriegl, V.; Li, W. B.; Oeh, U.; Ritt, J.; Roth, P.; Schlagbauer, M.; Schmitzer, Ch; Wahl, W.; Zombori, P.

    2007-01-01

    The idea of the IDEA project aimed to improve assessment of incorporated radionuclides through developments of more reliable and possibly faster in vivo and bioassay monitoring techniques and making use of such enhancements for improvements in routine monitoring. In direct in vivo monitoring technique the optimum choice of the detectors to be applied for different monitoring tasks has been investigated in terms of material, size and background in order to improve conditions namely to increase counting efficiency and reduce background. Detailed studies have been performed to investigate the manifold advantageous applications and capabilities of numerical simulation method for the calibration and optimisation of in vivo counting systems. This calibration method can be advantageously applied especially in the measurement of low-energy photon emitting radionuclides, where individual variability is a significant source of uncertainty. In bioassay measurements the use of inductively coupled plasma mass spectrometry (ICP-MS) can improve considerably both the measurement speed and the lower limit of detection currently achievable with alpha spectrometry for long-lived radionuclides. The work carried out in this project provided detailed guidelines for optimum performance of the technique of ICP-MS applied mainly for the determination of uranium and thorium nuclides in the urine including sampling procedure, operational parameters of the instruments and interpretation of the measured data. The paper demonstrates the main advantages of investigated techniques in comparison with the performances of methods commonly applied in routine monitoring practice. (authors)

  3. Habitat Evaluation Procedures (HEP) Report; Calispell Creek Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Calispell Creek property, an acquisition completed by the Kalispel Tribe of Indians in February 2004. Evaluation species and appropriate models include Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Calispell Creek Project provides a total of 138.17 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 5.16 HUs for mallard and muskrat. Grassland provides 132.02 HUs for mallard and Canada goose. Scrub-shrub vegetation provides 0.99 HUs for yellow warbler and white-tailed deer. The objective of using HEP at the Calispell Creek Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  4. Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  5. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 8--A Field Study of Predicting Impact of Research and Development Projects in Vocational and Technical Education.

    Science.gov (United States)

    Malhorta, Man Mohanlal

    As part of Project IMPACT's effort to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a field study was conducted to identify and validate variables and their order of importance in predicting and evaluating impact of research and development (R&D) projects in vocational and technical education.…

  6. Elemental hair analysis: A review of procedures and applications

    International Nuclear Information System (INIS)

    Pozebon, D.; Scheffler, G.L.; Dressler, V.L.

    2017-01-01

    Although exogenous contamination and unreliable reference values have limited the utility of scalp hair as a biomarker of chemical elements exposure, its use in toxicological, clinical, environmental and forensic investigations is growing and becoming more extensive. Therefore, hair elemental analysis is reviewed in the current manuscript which spans articles published in the last 10 years. It starts with a general discussion of history, morphology and possible techniques for elemental analysis, where inductively coupled plasma-mass spectrometry (ICP-MS) is clearly highlighted since this technique is leading quantitative ultra-trace elemental analysis. Emphasis over sampling, quality assurance, washing procedures and sample decomposition is given with detailed protocols compiled in tables as well as the utility of hair to identify human gender, age, diseases, healthy conditions, nutrition status and contamination sites. Isotope ratio information, chemical speciation analysis and analyte preconcentration are also considered for hair. Finally, the potential of laser ablation ICP-MS (LA-ICP-MS) to provide spatial resolution and time-track the monitoring of elements in hair strands instead of conventional bulk analysis is spotlighted as a real future trend in the field. - Highlights: • Elemental analysis of hair is critically reviewed, with focus on ICP-MS employment. • Standards protocols of hair washing and sample decomposition are compiled. • The usefulness of elemental and/or isotopic analysis of hair is demonstrated. • The potential of LA-ICP-MS for elemental time tracking in hair is highlighted.

  7. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  8. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  9. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  10. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  11. Auditory hallucinations: A review of the ERC "VOICE" project.

    Science.gov (United States)

    Hugdahl, Kenneth

    2015-06-22

    In this invited review I provide a selective overview of recent research on brain mechanisms and cognitive processes involved in auditory hallucinations. The review is focused on research carried out in the "VOICE" ERC Advanced Grant Project, funded by the European Research Council, but I also review and discuss the literature in general. Auditory hallucinations are suggested to be perceptual phenomena, with a neuronal origin in the speech perception areas in the temporal lobe. The phenomenology of auditory hallucinations is conceptualized along three domains, or dimensions; a perceptual dimension, experienced as someone speaking to the patient; a cognitive dimension, experienced as an inability to inhibit, or ignore the voices, and an emotional dimension, experienced as the "voices" having primarily a negative, or sinister, emotional tone. I will review cognitive, imaging, and neurochemistry data related to these dimensions, primarily the first two. The reviewed data are summarized in a model that sees auditory hallucinations as initiated from temporal lobe neuronal hyper-activation that draws attentional focus inward, and which is not inhibited due to frontal lobe hypo-activation. It is further suggested that this is maintained through abnormal glutamate and possibly gamma-amino-butyric-acid transmitter mediation, which could point towards new pathways for pharmacological treatment. A final section discusses new methods of acquiring quantitative data on the phenomenology and subjective experience of auditory hallucination that goes beyond standard interview questionnaires, by suggesting an iPhone/iPod app.

  12. A review of drilled shaft sealing for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1981-01-01

    Questions have been raised concerning the ability of the drillers of the exploratory shaft for the Basalt Waste Isolation program to develop an effective seal against water inflow down the annular space between the shaft casing and shaft wall into the mined chambers. We understand the need for shaft integrity and the concern of those responsible for the shaft planning. The purpose of this report is to give documentation to allay the fears of those who may have questions remaining in their minds concerning the prospects for a dry shaft. Included in this report are discussions of five projects where shaft sealing was effective in drilled shafts and one project where the material which is recommended for the exploratory shaft was used effectively in a conventional shaft. Also discussed is the recommended multitier approach toward shaft sealing which will, if adopted, use all of the current state of the art techniques to assure the watertightness of the shaft. It should be pointed out that none of the projects described here used all of the safeguards which are recommended in this program. If any of the materials and procedures recommended here are omitted, then of course the possibility increases for water migration through the casing-borehole annulus. It is our considered opinion that if the program recommended is adopted there will be no water inflow into the shaft, but if we are wrong or if, through human error, the program is not executed correctly, that we have devices and procedures available to us which will facilitate remedial work to perfect seal in the shaft. 4 refs., 3 figs., 1 tab

  13. Methods for testing the logical structure of plant procedure documents

    International Nuclear Information System (INIS)

    Horne, C.P.; Colley, R.; Fahley, J.M.

    1990-01-01

    This paper describes an ongoing EPRI project to investigate computer based methods to improve the development, maintenance, and verification of plant operating procedures. This project began as an evaluation of the applicability of structured software analysis methods to operating procedures. It was found that these methods offer benefits, if procedures are transformed to a structured representation to make them amenable to computer analysis. The next task was to investigate methods to transform procedures into a structured representation. The use of natural language techniques to read and compile the procedure documents appears to be viable for this purpose and supports conformity to guidelines. The final task was to consider possibilities of automated verification methods for procedures. Methods to help verify procedures were defined and information requirements specified. These methods take the structured representation of procedures as input. The software system being constructed in this project is called PASS, standing for Procedures Analysis Software System

  14. Safety cases for radioactive waste disposal facilities: guidance on confidence building and regulatory review IAEA-ASAM co-ordinated research project

    International Nuclear Information System (INIS)

    Ben Belfadhel, M.; Bennett, D.G.; Metcalf, P.; Nys, V.; Goldammer, W.

    2008-01-01

    The IAEA has been conducting two co-ordinated research programmes (CRPs) projects to develop and apply improved safety assessment methodologies for near-surface radioactive waste disposal facilities. The more recent of these projects, ASAM (application of safety assessment methodologies), included a Regulatory Review Working Group (RRWG) which has been working to develop guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides an overview of the ASAM project, focusing on the safety case and regulatory review. (authors)

  15. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  16. Analytical solution to the 1D Lemaitre's isotropic damage model and plane stress projected implicit integration procedure

    DEFF Research Database (Denmark)

    Andriollo, Tito; Thorborg, Jesper; Hattel, Jesper Henri

    2016-01-01

    obtaining an integral relationship between total strain and effective stress. By means of the generalized binomial theorem, an expression in terms of infinite series is subsequently derived. The solution is found to simplify considerably existing techniques for material parameters identification based...... on optimization, as all issues associated with classical numerical solution procedures of the constitutive equations are eliminated. In addition, an implicit implementation of the plane stress projected version of Lemaitre's model is discussed, showing that the resulting algebraic system can be reduced...

  17. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  18. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  19. Report on the behalf of the Economy, Sustainable Development and Land Planning Commission (1) on: the bill project, adopted by the National Assembly after application of the accelerated procedure, aiming at forbidding the exploration and exploitation of liquid or gaseous hydrocarbon mines by hydraulic fracturing, and abrogating exclusive search permits including projects using this technique

    International Nuclear Information System (INIS)

    Houel, M.

    2011-01-01

    This report first presents shale gases as a new resource for the French energetic independence, but also outlines the risks of durable environment damages when using inappropriate techniques. It outlines the need of a new law to review the current mining code, in order to forbid a practice which presents too important risks for the environment, to improve the knowledge on these issues, and to define more transparent procedures. It briefly presents the bill project, the main modifications introduced by the National Assembly, and the opinion of the Commission

  20. Restoration projects for decontamination of facilities from chemical, biological and radiological contamination after terrorist actions

    Energy Technology Data Exchange (ETDEWEB)

    Fingas, M.; Volchek, K.; Lumley, T.; Thouin, G.; Harrison, S.; Kuang, W. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Division, Environmental Technology Centre, Science and Technology Branch; Payette, P.; Laframboise, D.; Best, M. [Public Health Agency of Canada, Ottawa, ON (Canada); Krishnan, J.; Wagener, S.; Bernard, K.; Majcher, M. [Public Health Agency of Canada, Winnipeg, MB (Canada); Cousins, T.; Jones, T. [Defence Research and Development Canada, Ottawa, ON (Canada); Velicogna, D.; Hornof, M.; Punt, M. [SAIC Canada, Ottawa, ON (Canada)

    2006-07-01

    This paper reviewed studies that identified better decontamination methods for chemical, biological and radiological/nuclear (CBRN) attacks. In particular, it reviewed aspects of 3 projects in which procedures were tested and validated for site restoration. Cleanup targets or standards for decontaminating buildings and materials after a CBRN attack were also developed. The projects were based on physicochemical and toxicological knowledge of potential terrorist agents and selected surface matrices. The projects also involved modeling and assessing environmental and health risks. The first multi-agent project involved gathering information on known procedures for restoration of areas including interiors and exteriors of buildings, contents, parking lots, lawn, and vehicles. Air inside the building was included. The efficacy of some of the proposed concepts was tested. Results included the determination of appropriate surrogates for anthrax and tests of liquid and gaseous biocides on the surrogates. The development of new contamination procedures using peroxyacetic acid were also discussed. The second project involved decontamination tests on CBRN using specially-constructed buildings at the Counter-terrorism Technology Centre at Defence Research and Development Canada in Suffield. The buildings will be contaminated with chemical and biological agents and with short-lived radionuclides. They will be decontaminated using the best-performing technologies known. Information collected will include fate of the contaminant and decontamination products, effectiveness of the restoration methods, cost and duration of cleanup and logistical problems. The third project is aimed at developing cleanup standards for decontaminating buildings and construction materials after a chemical or biological attack. It will create as many as 12 algorithms for the development of 50 standards which will help cleanup personnel and first-responders to gauge whether proposed methods can achieve

  1. Reviews on current carbon emission reduction technologies and projects and their feasibilities on ships

    Science.gov (United States)

    Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng

    2017-06-01

    Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.

  2. A review on test procedure, energy efficiency standards and energy labels for room air conditioners and refrigerator-freezers

    Energy Technology Data Exchange (ETDEWEB)

    Mahlia, T.M.I.; Saidur, R. [Department of Mechanical Engineering, University of Malaya, 50603 Kuala Lumpur (Malaysia)

    2010-09-15

    Air conditioners and refrigerator-freezers are major energy users in a household environment and hence efficiency improvement of these appliances can be considered as an important step to reduce their energy consumption along with environmental pollution prevention. Energy efficiency standards and labels are commonly used tools to reduce the energy uses for household appliances for many countries around the world. The first step towards adopting energy efficiency standards is to establish a test procedure for rating and testing of an appliance. It may be mentioned that an energy test procedure is the technical foundation for energy efficiency standards, energy labels, and other related programs. This paper reviews requirements and specifications of various international test standards for testing and rating of room air conditioners and refrigerators. A review on the development of the energy efficiency standards has been provided as well. Finally, energy labels that provide some useful information for identifying energy efficient products have been reviewed for these appliances. It may be stated that the review will be useful for the developing countries who wish to develop these energy savings strategies. It is also expected to be useful to revise the existing strategies for a few selected countries who already implemented these strategies earlier. (author)

  3. Computer assisted procedure maintenance

    International Nuclear Information System (INIS)

    Bisio, R.; Hulsund, J. E.; Nilsen, S.

    2004-04-01

    The maintenance of operating procedures in a NPP is a tedious and complicated task. Through the whole life cycle of the procedures they will be dynamic, 'living' documents. Several aspects of the procedure must be considered in a revision process. Pertinent details and attributes of the procedure must be checked. An organizational structure must be created and responsibilities allotted for drafting, revising, reviewing and publishing procedures. Available powerful computer technology provides solutions within document management and computerisation of procedures. These solutions can also support the maintenance of procedures. Not all parts of the procedure life cycle are equally amenable to computerized support. This report looks at the procedure life cycle in todays NPPs and discusses the possibilities associated with introduction of computer technology to assist the maintenance of procedures. (Author)

  4. Review of procedures involving separation and preconcentration for the determination of cadmium using spectrometric techniques

    International Nuclear Information System (INIS)

    Ferreira, Sergio L.C.; Andrade, Jailson B. de; Korn, Maria das Gracas A.; Pereira, Madson de G.; Lemos, Valfredo A.; Santos, Walter N.L. dos; Rodrigues, Frederico de Medeiros; Souza, Anderson S.; Ferreira, Hadla S.; Silva, Erik G.P. da

    2007-01-01

    Spectrometric techniques for the analysis of trace cadmium have developed rapidly due to the increasing need for accurate measurements at extremely low levels of this element in diverse matrices. This review covers separation and preconcentration procedures, such as electrochemical deposition, precipitation, coprecipitation, solid phase extraction, liquid-liquid extraction (LLE) and cloud point extraction (CPE), and consider the features of the their application with several spectrometric techniques

  5. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  6. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  7. Antibiotic Prophylaxis for Gynecologic Procedures prior to and during the Utilization of Assisted Reproductive Technologies: A Systematic Review

    Directory of Open Access Journals (Sweden)

    Nigel Pereira

    2016-01-01

    Full Text Available The use of assisted reproductive technologies (ART has increased steadily. There has been a corresponding increase in the number of ART-related procedures such as hysterosalpingography (HSG, saline infusion sonography (SIS, hysteroscopy, laparoscopy, oocyte retrieval, and embryo transfer (ET. While performing these procedures, the abdomen, upper vagina, and endocervix are breached, leading to the possibility of seeding pelvic structures with microorganisms. Antibiotic prophylaxis is therefore important to prevent or treat any procedure-related infections. After careful review of the published literature, it is evident that routine antibiotic prophylaxis is generally not recommended for the majority of ART-related procedures. For transcervical procedures such as HSG, SIS, hysteroscopy, ET, and chromotubation, patients at risk for pelvic infections should be screened and treated prior to the procedure. Patients with a history of pelvic inflammatory disease (PID or dilated fallopian tubes are at high risk for postprocedural infections and should be given antibiotic prophylaxis during procedures such as HSG, SIS, or chromotubation. Antibiotic prophylaxis is recommended prior to oocyte retrieval in patients with a history of endometriosis, PID, ruptured appendicitis, or multiple prior pelvic surgeries.

  8. Habitat Evaluation Procedures (HEP) Report; West Beaver Lake Project, Technical Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 82.69 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 8.80 HUs for mallard, muskrat, and Canada goose. Conifer forest habitat provides 70.33 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Open water provides 3.30 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  9. Habitat Evaluation Procedures (HEP) Report; Upper Trimble Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  10. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  11. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  12. 32 CFR 162.6 - Procedures.

    Science.gov (United States)

    2010-07-01

    ... Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING PRODUCTIVITY ENHANCING CAPITAL INVESTMENT (PECI) § 162.6 Procedures. The following procedures shall be followed by the DoD Components in the... documentation, pre-investment analysis, financing, and post-investment accountability of PECI projects, when DoD...

  13. Reporting of the translation and cultural adaptation procedures of the Addenbrooke's Cognitive Examination version III (ACE-III) and its predecessors: a systematic review.

    Science.gov (United States)

    Mirza, Nadine; Panagioti, Maria; Waheed, Muhammad Wali; Waheed, Waquas

    2017-09-13

    The ACE-III, a gold standard for screening cognitive impairment, is restricted by language and culture, with no uniform set of guidelines for its adaptation. To develop guidelines a compilation of all the adaptation procedures undertaken by adapters of the ACE-III and its predecessors is needed. We searched EMBASE, Medline and PsychINFO and screened publications from a previous review. We included publications on adapted versions of the ACE-III and its predecessors, extracting translation and cultural adaptation procedures and assessing their quality. We deemed 32 papers suitable for analysis. 7 translation steps were identified and we determined which items of the ACE-III are culturally dependent. This review lists all adaptations of the ACE, ACE-R and ACE-III, rates the reporting of their adaptation procedures and summarises adaptation procedures into steps that can be undertaken by adapters.

  14. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  15. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  16. Proposal of organisation and ALARA procedures for maintenance site: application to replacement of steam generator

    International Nuclear Information System (INIS)

    Lochard, J.; Lefaure, C.

    1989-08-01

    This report proposes generic organization and ALARA procedures for preparing a maintenance site at a NPP. After a short description of the ALARA principle, it describes the proposition for French sites. They are grouped according to the following: motivation, organisation, means. They are illustrated by the example of steam generator replacement. Three special points concerning preparation of the site are developed: education; training of operators; review of the project

  17. Fusion Imaging for Procedural Guidance.

    Science.gov (United States)

    Wiley, Brandon M; Eleid, Mackram F; Thaden, Jeremy J

    2018-05-01

    The field of percutaneous structural heart interventions has grown tremendously in recent years. This growth has fueled the development of new imaging protocols and technologies in parallel to help facilitate these minimally-invasive procedures. Fusion imaging is an exciting new technology that combines the strength of 2 imaging modalities and has the potential to improve procedural planning and the safety of many commonly performed transcatheter procedures. In this review we discuss the basic concepts of fusion imaging along with the relative strengths and weaknesses of static vs dynamic fusion imaging modalities. This review will focus primarily on echocardiographic-fluoroscopic fusion imaging and its application in commonly performed transcatheter structural heart procedures. Copyright © 2017 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  18. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  19. The LHC Project Status and Prospects

    CERN Document Server

    Faugeras, Paul E

    2001-01-01

    The Large Hadron Collider (LHC), CERN's future major facility for high-energy physics, has entered into the construction and preparation for installation phases. After recalling briefly the main machine design choices and challenges, one will review the progress of civil works for the machine and experimental areas and the status of the main LHC components, which are presently series-built and for some of them procured in kind through world-wide collaborations. Report will also be given on the full-scale prototype of an elementary LHC lattice cell, called String 2, which is being commissioned and used for optimising the installation and testing procedures of the LHC. The size and duration of the LHC Project, its intrinsic complexity and the large number of world-wide collaborations involved require rather elaborate project management tools, which will be shortly described. Finally, following the extended running of the LEP and the delay for emptying of the machine tunnel, a new planning for project completion...

  20. DOE EERE Standard Operating Procedure Peer Review Best Practice and Procedures

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-01-18

    Objective review and advice from peers - peer review - provides managers, staff, and researchers with a powerful and effective tool for enhancing the management, relevance, effectiveness, and productivity of all of the EERE research, development

  1. UMTRA water sampling technical (peer) review: Responses to observations, comments, and recommendations submitted by Don Messinger (Roy F. Weston, Inc.)

    International Nuclear Information System (INIS)

    1993-08-01

    An independent technical review (peer review) was conducted during the period of September 15--17, 1992. The review was conducted by C. Warren Ankerberg (Geraghty and Miller, Inc., Tampa, Florida) and Don Messinger (Roy F. Weston, Inc., West Chester, Pennsylvania). The review was held at Jacobs Engineering in Albuquerque, New Mexico, and at the Shiprock, New Mexico, site. The peer review included a review of written documentation [water sampling standard operating procedures (SOP)], an inspection of technical reports and other deliverables, a review of staff qualifications and training, and a field visit to evaluate the compliance of field procedures with SOPS. Upon completion of the peer review, each reviewer independently prepared a report of findings from the review. The reports listed findings and recommended actions. This document responds to the observations, comments, and recommendations submitted by Don Messinger following his review. The format of this document is to present the findings and recommendations verbatim from Mr. Messinger's report, followed by responses from the UMTRA Project staff. Included in the responses from the UMTRA Project staff are recommended changes in SOPs and strategies for implementing the charges

  2. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  3. Hemodynamic outcomes of the Ross procedure versus other aortic valve replacement: a systematic review and meta-analysis.

    Science.gov (United States)

    Um, Kevin J; McCLURE, Graham R; Belley-Cote, Emilie P; Gupta, Saurabh; Bouhout, Ismail; Lortie, Hugo; Alraddadi, Hatim; Alsagheir, Ali; Bossard, Matthias; McINTYRE, William F; Lengyel, Alexandra; Eikelboom, John W; Ouzounian, Maral; Chu, Michael W; Parry, Dominic; El-Hamamsy, Ismail; Whitlock, Richard P

    2018-01-09

    Life expectancy in young adults undergoing mechanical or bioprosthetic aortic valve replacement (AVR) may be reduced by up to 20 years compared to age matched controls. The Ross procedure is a durable, anticoagulation-sparing alternative. We performed a systematic review and meta-analysis to compare the valve hemodynamics of the Ross procedure versus other AVR. We searched Cochrane CENTRAL, MEDLINE and EMBASE from inception to February 2017 for randomized controlled trials (RCTs) and observational studies (n≥10 Ross). Independently and in duplicate, we performed title and abstract screening, full-text eligibility assessment, and data collection. We evaluated the risk of bias with the Cochrane and CLARITY tools, and the quality of evidence with the GRADE framework. We identified 2 RCTs and 13 observational studies that met eligibility criteria (n=1,412). In observational studies, the Ross procedure was associated with a lower mean aortic gradient at discharge (MD -9 mmHg, 95% CI [-13, -5], pRoss procedure was associated with a lower mean gradient at latest follow-up (MD -15 mmHg, 95% CI [-32, 2], p=0.08, I2=99%). The mean pulmonic gradient for the Ross procedure was 18.0 mmHg (95% CI [16, 20], pRoss procedure was associated with better aortic valve hemodynamics. Future studies should evaluate the impact of the Ross procedure on exercise capacity and quality of life.

  4. Airway Management During Upper GI Endoscopic Procedures: State of the Art Review.

    Science.gov (United States)

    Goudra, Basavana; Singh, Preet Mohinder

    2017-01-01

    With the growing popularity of propofol mediated deep sedation for upper gastrointestinal (GI) endoscopic procedures, challenges are being felt and appreciated. Research suggests that management of the airway is anything but routine in this setting. Although many studies and meta-analyses have demonstrated the safety of propofol sedation administered by registered nurses under the supervision of gastroenterologists (likely related to the lighter degrees of sedation than those provided by anesthesia providers and is under medicolegal controversy in the United States), there is no agreement on the optimum airway management for procedures such as endoscopic retrograde cholangiopancreatography. Failure to rescue an airway at an appropriate time has led to disastrous consequences. Inability to evaluate and appreciate the risk factors for aspiration can ruin the day for both the patient and the health care providers. This review apprises the reader of various aspects of airway management relevant to the practice of sedation during upper GI endoscopy. New devices and modification of existing devices are discussed in detail. Recognizing the fact that appropriate monitoring is important for timely recognition and management of potential airway disasters, these issues are explored thoroughly.

  5. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  6. FREY’S PROCEDURE- TO ANALYSE THE OUTCOME OF THIS PROCEDURE IN CHRONIC PANCREATITIS

    Directory of Open Access Journals (Sweden)

    Shilpa Mariappa Casaba

    2017-04-01

    Full Text Available BACKGROUND Chronic Pancreatitis (CP is a progressive inflammatory disease characterised by debilitating pain and pancreatic insufficiency. There is enormous personal and socio-economic impact on impairment of quality of life, inability to work and even shortening of life expectancy. Although, pancreaticoduodenectomy had been considered the standard surgical procedure for patients with CP because of its high post-op complications with exocrine and endocrine insufficiency, it is not preferred. This has led to a hybrid procedure described by Frey’s, which is used in our study for CP. We aim to analyse the short-term and long-term outcomes of Frey’s procedure at a tertiary care center in patients with chronic pancreatitis. MATERIALS AND METHODS A retrospective review of all CP patients who underwent Frey procedure were reviewed from January 2007-January 2016. Perioperative variables, short-term (30 days and long-term (3 years outcomes were reviewed. Data are frequency (% or mean. RESULTS A total of 97 patients underwent Frey’s procedure. A total of 72 (70.7% were men and 25 (29.3% were women. Mean age was 38 years (range 14-66 years. Indications for surgery included intractable pain (n=97, 100% and obstructive jaundice (n=4, 4.3%. 9 patients (32.6% were diabetic preoperatively. Concomitant procedures include biliary drainage procedure was done for 4 patients (4.3%, i.e. choledochojejunostomy and splenectomy for 2 patients (2.1%, cholecystectomy (n=6, 6%. Short-term outcomes include surgical site infection (n=10, 10%, pancreatic leak (n=6, 5.82% and 2 patients required reoperation for bleeding and no mortality (30 days, diabetic ketoacidosis (n=2, 2%. Pancreatic carcinoma was detected in 3 (2.1% patients. Long-term outcomes include pain free status (n=80, 86.9%, median follow-up of 3 years. Redo pancreatic procedure was performed in 1 (4.3% for anastomotic leak. CONCLUSION Frey’s procedure is a safe and effective pain palliative option for CP

  7. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  8. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  9. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  10. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  11. EUS-Guided Vascular Procedures: A Literature Review

    Directory of Open Access Journals (Sweden)

    Tomislav Bokun

    2013-01-01

    Full Text Available Endoscopic ultrasound (EUS is continuously stepping into the therapeutic arena, simultaneously evolving in different directions, such as the management of pancreatic and biliary diseases, celiac neurolysis, delivering local intratumoral therapy, and EUS-guided endosurgery. EUS-guided vascular procedures are also challenging, considering the variety of vascular pathology, proximity of the vascular structures to the GI tract wall, high resolution, and real-time guidance offering an attractive access route and precise delivery of the intervention. The literature on vascular therapeutic EUS demonstrates techniques for the management of upper GI variceal and nonvariceal bleeding, pseudoaneurysms, and coiling and embolization procedures, as well as the creation of intrahepatic portosystemic shunts. The paucity of studies, diversity of study designs, and the number of animal model studies hamper a systematic approach to the conclusion and decision making important to clinicians and healthcare policy makers. Nevertheless, theoretical benefits and findings up to date concerning technical feasibility, efficacy, and safety of the procedures drive further research and development in this rather young therapeutic arena.

  12. Considerable variability of procedural sedation and analgesia practices for gastrointestinal endoscopic procedures in Europe

    NARCIS (Netherlands)

    Vaessen, Hermanus H B; Knape, Johannes T A

    2016-01-01

    Background/Aims: The use of moderate to deep sedation for gastrointestinal endoscopic procedures has increased in Europe considerably. Because this level of sedation is a risky medical procedure, a number of international guidelines have been developed. This survey aims to review if, and if so

  13. [Review of draft Crystalline Repository Project reports]: Technical progress report, CY 1985-1986

    International Nuclear Information System (INIS)

    1986-01-01

    During the period (CY 1985-86) of this report, the Wisconsin Radioactive Waste Review Board provided technical services under the contract with DOE. These included Participation in the development of variables and screening techniques that would be used in identifying those rock bodies in the Area Recommendation Report (ARR); reviewing and commenting on the report and developing a procedure in which local residents could have input into the process; sought resumption of negotiations with DOE on a full Consultation and Cooperation (CandC) agreement; and Participating in workshops and provided comments on two major DOE transportation documents, ''Transportation Business Plan: Strategy Options Document,'' and ''Transportation Institutional Plan.''

  14. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  15. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  16. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  17. OCRWM international procedures

    International Nuclear Information System (INIS)

    1986-03-01

    These international procedures provide guidance and assistance for the Office of Civilian Radioactive Waste Management (OCRWM) and for OCRWM Project Offices, contractors and subcontractors in conducting international activities. They supplement the relevant Department of Energy (DOE) orders (which are referenced), not supplant them

  18. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  19. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    Science.gov (United States)

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  20. Development to requirements for a procedures software tool

    International Nuclear Information System (INIS)

    Yasutake, J.Y.; Hachiro Isoda

    1993-01-01

    In 1989, the Electric Power Research Institute (EPRI) and the Central Research Institute of the Electric Power Industry (CRIEPI) in Japan initiated a joint research program to investigate various interventions to reduce personnel errors and inefficiencies in the maintenance of nuclear power plants. This program, consisting of several interrelated projects, was initiated because of the mutual recognition of the importance of the human element in the efficient and safe operation of utilities and the continuing need to enhance personnel performance to sustain plant safety and availability. This paper summarizes one of the projects, jointly funded by EPRI and CRIEPI, to analyze the requirements for, and prepare a functional description of, a procedures software tool (PST). The primary objective of this project was to develop a description of the features and functions of a software tool that would help procedure writers to improve the quality of maintenance and testing procedures, thereby enhancing the performance of both procedure writers and maintenance personnel

  1. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  2. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  3. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  4. Delayed manifestation of bilateral scleral thinning after I-BRITE® procedure and review of literature for cosmetic eye-whitening procedures

    Directory of Open Access Journals (Sweden)

    Moshirfar M

    2015-03-01

    Full Text Available Majid Moshirfar,1 Michael V McCaughey,2 Carlton R Fenzl,3 Luis Santiago-Caban,4 Gregory D Kramer,3 Nick Mamalis3 1Department of Ophthalmology, Francis I Proctor Foundation, University of California San Francisco, San Francisco, CA, USA; 2University of New Mexico School of Medicine, Albuquerque, NM, USA; 3John A Moran Eye Center, University of Utah, Salt Lake City, UT, USA; 4Department of Ophthalmology, University of Puerto Rico School of Medicine, San Juan, PR, USA Purpose: To report a case of delayed-onset bilateral scleral thinning and calcium deposition following a cosmetic ocular-whitening procedure (I-BRITE®.Methods: A 33-year-old male patient with a history of right-sided ptosis repair and left-sided anterior uveitis had previously undergone bilateral I-BRITE treatment for chronic conjunctival hyperemia. Four years after the procedure, the patient was referred to our institution with bilateral scleral thinning and overlying calcific depositions. A literature review was performed through PubMed from 1980 through 2014 using the search terms ‘cosmetic’, ‘ocular’, ‘conjunctivectomy’, ‘regional conjunctivectomy’, ‘I-BRITE’, ‘eye-whitening’, ‘scleritis’, ‘necrotizing scleritis’, ‘anterior uveitis’, ‘mitomycin C’, ‘5-fluorouracil’, and ‘bevacizumab’, along with associated cross-referencing from relevant articles.Results: Examination of the patient revealed bilateral necrotizing scleritis within the nasal region of both eyes. Calcified plaques were also present within the areas of scleromalacia, along with epithelial defects demonstrated with fluorescein staining. Although evidence of previous intraocular inflammation was apparent within the left eye, there were no active signs of inflammation evident within either eye on initial presentation. Complication rates reported in the literature include: scleral thinning (1.8%, calcific plaque formation (2.9%, fibrovascular proliferation (13%, diplopia (1

  5. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  6. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  7. Experiences with a procedure for modeling product knowledge

    DEFF Research Database (Denmark)

    Hansen, Benjamin Loer; Hvam, Lars

    2002-01-01

    This paper presents experiences with a procedure for building configurators. The procedure has been used in an American company producing custom-made precision air conditioning equipment. The paper describes experiences with the use of the procedure and experiences with the project in general....

  8. X-ray computerized tomography based on the method of reciprocal projection with filtration by double differentiation. Procedure and information peculiarities

    International Nuclear Information System (INIS)

    Vajnberg, Eh.I.; Kazak, I.A.; Fajngojz, M.L.

    1985-01-01

    The results of experimental evaluation of procedure and information peculiarities of the method of reciprocal projection with filtration of projections by double differentiation (RPFDD) for the monitoring of industrial products are generalized. Succession of stages n the RPFDD method permits to separately optimize reconstruction of high-frequeny and low-frequency tomogram structure which sharply reduces the acuteness of contradictions of conventional scheme between the required increase of accuracy and intolerable growth of computerized charges. High accuracy of evaluation of the linear attenuation factor of low-frequency structures in a wide range of densities at the last stage of RPFDD scheme is attained despite the non-conventionally small range of values at earlier stages of computerized processing

  9. Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved

    Science.gov (United States)

    2012-03-01

    exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.

  10. Geological challenges in radioactive waste isolation: Third worldwide review

    International Nuclear Information System (INIS)

    Witherspoon Editor, P.A.; Bodvarsson Editor, G.S.

    2001-01-01

    The broad range of activities on radioactive waste isolation that are summarized in Table 1.1 provides a comprehensive picture of the operations that must be carried out in working with this problem. A comparison of these activities with those published in the two previous reviews shows the important progress that is being made in developing and applying the various technologies that have evolved over the past 20 years. There are two basic challenges in perfecting a system of radioactive waste isolation: choosing an appropriate geologic barrier and designing an effective engineered barrier. One of the most important developments that is evident in a large number of the reports in this review is the recognition that a URL provides an excellent facility for investigating and characterizing a rock mass. Moreover, a URL, once developed, provides a convenient facility for two or more countries to conduct joint investigations. This review describes a number of cooperative projects that have been organized in Europe to take advantage of this kind of a facility in conducting research underground. Another critical development is the design of the waste canister (and its accessory equipment) for the engineered barrier. This design problem has been given considerable attention in a number of countries for several years, and some impressive results are described and illustrated in this review. The role of the public as a stakeholder in radioactive waste isolation has not always been fully appreciated. Solutions to the technical problems in characterizing a specific site have generally been obtained without difficulty, but procedures in the past in some countries did not always keep the public and local officials informed of the results. It will be noted in the following chapters that this procedure has caused some problems, especially when approval for a major component in a project was needed. It has been learned that a better way to handle this problem is to keep all

  11. Geological challenges in radioactive waste isolation: Third worldwide review

    Energy Technology Data Exchange (ETDEWEB)

    Witherspoon Editor, P.A.; Bodvarsson Editor, G.S.

    2001-12-01

    The broad range of activities on radioactive waste isolation that are summarized in Table 1.1 provides a comprehensive picture of the operations that must be carried out in working with this problem. A comparison of these activities with those published in the two previous reviews shows the important progress that is being made in developing and applying the various technologies that have evolved over the past 20 years. There are two basic challenges in perfecting a system of radioactive waste isolation: choosing an appropriate geologic barrier and designing an effective engineered barrier. One of the most important developments that is evident in a large number of the reports in this review is the recognition that a URL provides an excellent facility for investigating and characterizing a rock mass. Moreover, a URL, once developed, provides a convenient facility for two or more countries to conduct joint investigations. This review describes a number of cooperative projects that have been organized in Europe to take advantage of this kind of a facility in conducting research underground. Another critical development is the design of the waste canister (and its accessory equipment) for the engineered barrier. This design problem has been given considerable attention in a number of countries for several years, and some impressive results are described and illustrated in this review. The role of the public as a stakeholder in radioactive waste isolation has not always been fully appreciated. Solutions to the technical problems in characterizing a specific site have generally been obtained without difficulty, but procedures in the past in some countries did not always keep the public and local officials informed of the results. It will be noted in the following chapters that this procedure has caused some problems, especially when approval for a major component in a project was needed. It has been learned that a better way to handle this problem is to keep all

  12. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  13. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  14. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  15. HYPNOSIS FOR ACUTE PROCEDURAL PAIN: A Critical Review

    Science.gov (United States)

    Kendrick, Cassie; Sliwinski, Jim; Yu, Yimin; Johnson, Aimee; Fisher, William; Kekecs, Zoltán; Elkins, Gary

    2015-01-01

    Clinical evidence for the effectiveness of hypnosis in the treatment of acute, procedural pain was critically evaluated based on reports from randomized controlled clinical trials (RCTs). Results from the 29 RCTs meeting inclusion criteria suggest that hypnosis decreases pain compared to standard care and attention control groups and that it is at least as effective as comparable adjunct psychological or behavioral therapies. In addition, applying hypnosis in multiple sessions prior to the day of the procedure produced the highest percentage of significant results. Hypnosis was most effective in minor surgical procedures. However, interpretations are limited by considerable risk of bias. Further studies using minimally effective control conditions and systematic control of intervention dose and timing are required to strengthen conclusions. PMID:26599994

  16. Hypnosis for Acute Procedural Pain: A Critical Review.

    Science.gov (United States)

    Kendrick, Cassie; Sliwinski, Jim; Yu, Yimin; Johnson, Aimee; Fisher, William; Kekecs, Zoltán; Elkins, Gary

    2016-01-01

    Clinical evidence for the effectiveness of hypnosis in the treatment of acute procedural pain was critically evaluated based on reports from randomized controlled clinical trials (RCTs). Results from the 29 RCTs meeting inclusion criteria suggest that hypnosis decreases pain compared to standard care and attention control groups and that it is at least as effective as comparable adjunct psychological or behavioral therapies. In addition, applying hypnosis in multiple sessions prior to the day of the procedure produced the highest percentage of significant results. Hypnosis was most effective in minor surgical procedures. However, interpretations are limited by considerable risk of bias. Further studies using minimally effective control conditions and systematic control of intervention dose and timing are required to strengthen conclusions.

  17. Assessing community-based conservation projects: A systematic review and multilevel analysis of attitudinal, behavioral, ecological, and economic outcomes

    Directory of Open Access Journals (Sweden)

    Brooks Jeremy

    2013-01-01

    Full Text Available Abstract Background Community-based conservation (CBC promotes the idea that long-term conservation success requires engaging with, and providing benefits for local communities. Though widespread, CBC projects are not always successful or free of controversy. With criticisms on all sides of the conservation debates, it is critical to have a better understanding of (1 whether CBC is an effective conservation tool, and (2 of the factors associated with the success or failure of CBC projects, and the scale at which these factors operate. Recent CBC reviews have typically examined only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a newly coded global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic and explore synergies and tradeoffs among these outcomes. We test hypotheses about how features of the national context (H-NC, project design (H-PD, and local community characteristics (H-CC affect these four measures of success. Methods To add to a sample of 62 projects that we used from previous systematic reviews, we systematically searched the conservation literature using six terms in four online databases. To increase the number of projects for each country in order to conduct a multilevel analysis, we also conducted a secondary search using the Advancing Conservation in a Social Context online library. We coded projects for 65 pieces of information. We conducted bivariate analyses using two-dimensional contingency tables and proportional odds logistic regression and conducted multivariate analyses by fitting reduced form proportional odds logistic regression models that were selected using a forward stepwise AIC approach. Results The primary and secondary searches produced 74 new projects to go along with the 62

  18. Review of the TMI-2 accident evaluation and vessel investigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ladekarl Thomsen, Knud

    1998-03-01

    The results of the TMI-2 Accident Evaluation Programme and the Vessel Investigation Project have been reviewed as part of a literature study on core meltdown and in-vessel coolability. The emphasis is placed on the late phase melt progression, which is of special relevance to the NKS-sponsored RAK-2.1 project on Severe Accident Phenomenology. The body of the report comprises three main sections, The TMI-2 Accident Scenario, Core Region and Relocation Path Investigations, and Lower Head Investigations. In the final discussion, the lower head gap formation mechanism is explained in terms of thermal contraction and fracturing of the debris crust. This model seems more plausible than the MAAP model based on creep expansion of the lower head. (au) 1 tab., 33 ills., 31 refs.

  19. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  20. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  1. Quantization Procedures; Sistemas de cuantificacion

    Energy Technology Data Exchange (ETDEWEB)

    Cabrera, J. A.; Martin, R.

    1976-07-01

    We present in this work a review of the conventional quantization procedure, the proposed by I.E. Segal and a new quantization procedure similar to this one for use in non linear problems. We apply this quantization procedures to different potentials and we obtain the appropriate equations of motion. It is shown that for the linear case the three procedures exposed are equivalent but for the non linear cases we obtain different equations of motion and different energy spectra. (Author) 16 refs.

  2. Observational Coding Systems of Parent-Child Interactions During Painful Procedures: A Systematic Review.

    Science.gov (United States)

    Bai, Jinbing; Swanson, Kristen M; Santacroce, Sheila J

    2018-01-01

    Parent interactions with their child can influence the child's pain and distress during painful procedures. Reliable and valid interaction analysis systems (IASs) are valuable tools for capturing these interactions. The extent to which IASs are used in observational research of parent-child interactions is unknown in pediatric populations. To identify and evaluate studies that focus on assessing psychometric properties of initial iterations/publications of observational coding systems of parent-child interactions during painful procedures. To identify and evaluate studies that focus on assessing psychometric properties of initial iterations/publications of observational coding systems of parent-child interactions during painful procedures. Computerized databases searched included PubMed, CINAHL, PsycINFO, Health and Psychosocial Instruments, and Scopus. Timeframes covered from inception of the database to January 2017. Studies were included if they reported use or psychometrics of parent-child IASs. First assessment was whether the parent-child IASs were theory-based; next, using the Society of Pediatric Psychology Assessment Task Force criteria IASs were assigned to one of three categories: well-established, approaching well-established, or promising. A total of 795 studies were identified through computerized searches. Eighteen studies were ultimately determined to be eligible for inclusion in the review and 17 parent-child IASs were identified from these 18 studies. Among the 17 coding systems, 14 were suitable for use in children age 3 years or more; two were theory-based; and 11 included verbal and nonverbal parent behaviors that promoted either child coping or child distress. Four IASs were assessed as well-established; seven approached well-established; and six were promising. Findings indicate a need for the development of theory-based parent-child IASs that consider both verbal and nonverbal parent behaviors during painful procedures. Findings also

  3. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  4. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  5. What Is Our Current Understanding of One-to-One Computer Projects: A Systematic Narrative Research Review

    Science.gov (United States)

    Fleischer, Hakan

    2012-01-01

    The aim of this article is to review cross-disciplinary accumulated empirical research on one-to-one computer projects in school settings as published in peer-reviewed journals between 2005 and 2010, particularly the results of teacher- and pupil-oriented studies. Six hundred and five research articles were screened at the abstract and title…

  6. The Use of Thrombopoietin Receptor Agonists for Correction of Thrombocytopenia prior to Elective Procedures in Chronic Liver Diseases: Review of Current Evidence

    Directory of Open Access Journals (Sweden)

    Kamran Qureshi

    2016-01-01

    Full Text Available Patients with chronic liver diseases (CLD undergo a range of invasive procedures during their clinical lifetime. Various hemostatic abnormalities are frequently identified during the periprocedural work-up; including thrombocytopenia. Thrombocytopenia of cirrhosis is multifactorial in origin, and decreased activity of thrombopoietin has been identified to be a major cause. Liver is an important site of thrombopoietin production and its levels are decreased in patients with cirrhosis. Severe thrombocytopenia (platelet counts < 60–75,000/µL is associated with increased risk of bleeding with invasive procedures. In recent years, compounds with thrombopoietin receptor agonist activity have been studied as therapeutic options to raise platelet counts in CLD. We reviewed the use of Eltrombopag, Romiplostim, and Avatrombopag prior to various invasive procedures in patients with CLD. These agents seem promising in raising platelet counts before elective procedures resulting in reduction in platelet transfusions, and they also enabled more patients to undergo the procedures. However, these studies were not primarily aimed at comparing bleeding episodes among groups. Use of these agents had some adverse consequences, importantly being the occurrence of portal vein thrombosis. This review highlights the need of further studies to identify reliable methods of safely reducing the provoked bleeding risk linked to thrombocytopenia in CLD.

  7. Forthcoming indefinite contract review procedure

    CERN Multimedia

    Human Resources Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published in early April 2011. In the meantime, the list of posts to be opened this spring is available at the following address: Indefinite contract posts - spring 2011 A second exercise will take place in autumn 2011 and, as of 2012, the indefinite contract award procedure will only be held once a year, in autumn. For more information please consult: https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp  

  8. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  9. 77 FR 49057 - Categorical Exclusion From Further Environmental Review for Standard Terminal Arrival Route...

    Science.gov (United States)

    2012-08-15

    ... Environmental Review for Standard Terminal Arrival Route Procedures for Ronald Reagan Washington National... Ronald Reagan Washington National Airport (DCA). As required by the National Environmental Policy Act, an...), TRUPS1 (RNAV), and NUMMY. Location: Ronald Reagan Washington National Airport (DCA). This project...

  10. Ultra High-Performance Fiber-Reinforced Concrete (UHPFRC: a review of material properties and design procedures

    Directory of Open Access Journals (Sweden)

    T. E. T. Buttignol

    Full Text Available ABSTRACT This paper does a review of the recent achievements on the knowledge of UHPFRC properties and in the development of design procedures. UHPFRC is defined as a new material, with unique properties (high ductility, low permeability, very high strength capacity in compression, higher toughness in comparison to conventional concrete. It is important to know both material and mechanical properties to fully take advantage of its outstanding properties for structural applications. However, since this is a new material, the current design codes are not well suited and should be reviewed before being applied to UHPFRC. In the first part, the following material properties are addressed: hydration process; permeability; fibers role; mix design; fiber-matrix bond properties workability; mixing procedure; and curing. In the second part, the mechanical properties of the material are discussed, together with some design recommendations. The aspects herein examined are: size effect; compressive and flexural strength; tensile stress-strain relation; shear and punching shear capacity; creep and shrinkage; fracture energy; steel bars anchorage and adherence. Besides, the tensile mechanical characterization is described using inverse analysis based on bending tests data. In the last part, material behavior at high temperature is discussed, including physical-chemical transformations of the concrete, spalling effect, and transient creep. In the latter case, a new Load Induced Thermal Strain (LITS semi-empirical model is described and compared with UHPC experimental results.

  11. 75 FR 29996 - Review of MMS NEPA Policies, Practices, and Procedures for OCS Oil and Gas Exploration and...

    Science.gov (United States)

    2010-05-28

    ... Environmental Policy Act (NEPA) policies, practices, and procedures for the Minerals Management Service (MMS... applies NEPA in its management of Outer Continental Shelf oil and gas exploration and development and make recommendations for revisions. The scope of the review is intended to be holistic, i.e. from leasing decisions to...

  12. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  13. Real-time "x-ray vision" for healthcare simulation: an interactive projective overlay system to enhance intubation training and other procedural training.

    Science.gov (United States)

    Samosky, Joseph T; Baillargeon, Emma; Bregman, Russell; Brown, Andrew; Chaya, Amy; Enders, Leah; Nelson, Douglas A; Robinson, Evan; Sukits, Alison L; Weaver, Robert A

    2011-01-01

    We have developed a prototype of a real-time, interactive projective overlay (IPO) system that creates augmented reality display of a medical procedure directly on the surface of a full-body mannequin human simulator. These images approximate the appearance of both anatomic structures and instrument activity occurring within the body. The key innovation of the current work is sensing the position and motion of an actual device (such as an endotracheal tube) inserted into the mannequin and using the sensed position to control projected video images portraying the internal appearance of the same devices and relevant anatomic structures. The images are projected in correct registration onto the surface of the simulated body. As an initial practical prototype to test this technique we have developed a system permitting real-time visualization of the intra-airway position of an endotracheal tube during simulated intubation training.

  14. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  15. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  16. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  17. ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities

    CERN Document Server

    Dayley, L

    2000-01-01

    The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger levels requiring radiological reviews of non-routine or complex work activities. These requirements are implemented in site procedures HNF-PRO-1622 and 1623. HNF-PRO-1622 Radiological Design Review Process requires that ''radiological design reviews [be performed] of new facilities and equipment and modifications of existing facilities and equipment''. In addition, HNF-PRO-1623 Radiological Work Planning Process requires a formal ALARA Review for planned activities that are estimated to exceed 1 person-rem total Dose Equivalent (DE). The purpose of this review is to validate that the original design for the PFP Cementation Process ensures that the principles of ALARA (As Low As Reasonably Achievable) were included...

  18. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  19. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2014-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  20. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  1. Atmospheric Ionizing Radiation (AIR) Project Review

    Science.gov (United States)

    Singleterry, R. C., Jr.; Wilson, J. W.; Whitehead, A. H.; Goldhagen, P. E.

    1999-01-01

    The National Council on Radiation Protection and Measurement (NCRP) and the National Academy of Science (NAS) established that the uncertainty in the data and models associated with the high-altitude radiation environment could and should be reduced. In response, the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy Environmental Measurements Laboratory (EML) created the Atmospheric Ionizing Radiation (AIR) Project under the auspices of the High Speed Research (HSR) Program Office at the Langley Research Center. NASA's HSR Program was developed to address the potential of a second-generation supersonic transport. A critical element focussed on the environmental issues, including the threat to crew and passengers posed by atmospheric radiation. Various international investigators were solicited to contribute instruments to fly on an ER-2 aircraft at altitudes similar to those proposed for the High Speed Civil Transport (HSCT). A list of participating investigators, their institutions, and instruments with quantities measured is presented. The flight series took place at solar minimum (radiation maximum) with northern, southern, and east/west flights. The investigators analyzed their data and presented preliminary results at the AIR Workshop in March, 1998. A review of these results are included.

  2. A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags

    Directory of Open Access Journals (Sweden)

    Angela Hsiang-Ling Chen

    2016-09-01

    Full Text Available Modeling and optimizing organizational processes, such as the one represented by the Resource-Constrained Project Scheduling Problem (RCPSP, improve outcomes. Based on assumptions and simplification, this model tackles the allocation of resources so that organizations can continue to generate profits and reinvest in future growth. Nonetheless, despite all of the research dedicated to solving the RCPSP and its multi-mode variations, there is no standardized procedure that can guide project management practitioners in their scheduling tasks. This is mainly because many of the proposed approaches are either based on unrealistic/oversimplified scenarios or they propose solution procedures not easily applicable or even feasible in real-life situations. In this study, we solve a more true-to-life and complex model, Multimode RCPSP with minimal and maximal time lags (MRCPSP/max. The complexity of the model solved is presented, and the practicality of the proposed approach is justified depending on only information that is available for every project regardless of its industrial context. The results confirm that it is possible to determine a robust makespan and to calculate an execution time-frame with gaps lower than 11% between their lower and upper bounds. In addition, in many instances, the solved lower bound obtained was equal to the best-known optimum.

  3. Procedure automation: the effect of automated procedure execution on situation awareness and human performance

    International Nuclear Information System (INIS)

    Andresen, Gisle; Svengren, Haakan; Heimdal, Jan O.; Nilsen, Svein; Hulsund, John-Einar; Bisio, Rossella; Debroise, Xavier

    2004-04-01

    As advised by the procedure workshop convened in Halden in 2000, the Halden Project conducted an experiment on the effect of automation of Computerised Procedure Systems (CPS) on situation awareness and human performance. The expected outcome of the study was to provide input for guidance on CPS design, and to support the Halden Project's ongoing research on human reliability analysis. The experiment was performed in HAMMLAB using the HAMBO BWR simulator and the COPMA-III CPS. Eight crews of operators from Forsmark 3 and Oskarshamn 3 participated. Three research questions were investigated: 1) Does procedure automation create Out-Of-The-Loop (OOTL) performance problems? 2) Does procedure automation affect situation awareness? 3) Does procedure automation affect crew performance? The independent variable, 'procedure configuration', had four levels: paper procedures, manual CPS, automation with breaks, and full automation. The results showed that the operators experienced OOTL problems in full automation, but that situation awareness and crew performance (response time) were not affected. One possible explanation for this is that the operators monitored the automated procedure execution conscientiously, something which may have prevented the OOTL problems from having negative effects on situation awareness and crew performance. In a debriefing session, the operators clearly expressed their dislike for the full automation condition, but that automation with breaks could be suitable for some tasks. The main reason why the operators did not like the full automation was that they did not feel being in control. A qualitative analysis addressing factors contributing to response time delays revealed that OOTL problems did not seem to cause delays, but that some delays could be explained by the operators having problems with the freeze function of the CPS. Also other factors such as teamwork and operator tendencies were of importance. Several design implications were drawn

  4. A project to develop restoration methods for buildings and facilities after a terrorist attack

    Energy Technology Data Exchange (ETDEWEB)

    Fingas, M.F. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Div]|[Environment Canada, Ottawa, ON (Canada). River Road Environmental Technology Centre; Volchek, K.; Hornof, M.; Boudreau, L.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Best, M. [Health Canada, Ottawa, ON (Canada); Garbutt, M.; Krishnan, J.; Wagener, S.; Bernard, K. [Health Canada, Winnipeg, MB (Canada); Cousins, T.; Haslip, D. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2004-07-01

    A multi-agent project was initiated to review site restoration after a terrorist attack. The objective was to acquire and compile information on all known restoration procedures for buildings, exteriors of buildings, their interior contents, and adjacent areas such as parking lots, lawns and vehicles. All procedures were then tested and validated. Restoration procedures included pickup, neutralization, decontamination, removal and final destruction/deposition of the contaminant, cleaning material and contaminated debris resulting from the terrorist act. This research and development project considered chemical, biological and nuclear contamination with the intent to develop methods to decontaminate and restore buildings after a chemical, biological and radiological (CBR) attack. Ideas were collected from work conducted around the world. The efficacy of best candidates was tested along with all selected chemical target items. The project also involved the preparation of procedures for decontamination and restoration. Ultimately, a tradeoff decision basis will be developed to provide information on abandonment and quarantine versus cleanup. The study revealed that there are several technologies that can be used for the decontamination of structures and equipment after acts of terrorism, however, no one technique will work for all contaminants on all surfaces. The selection of a decontamination method depends on the contaminant, the surface being decontaminated and economic, social and health factors. The amount of waste generated by decontamination is a major feasibility factor. 25 refs., 6 tabs.

  5. Midwest Forensics Resource Center Project Summary June 2005

    Energy Technology Data Exchange (ETDEWEB)

    David Baldwin

    2005-06-01

    The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its application to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach and

  6. Rethinking project management: A structured literature review with a critical look at the brave new world

    DEFF Research Database (Denmark)

    Svejvig, Per; Andersen, Peter

    2015-01-01

    This paper presents the results of a structured review of the rethinking project management (RPM) literature based on the classification and analysis of 74 contributions and in addition takes a critical look at this brave new world. Through the analysis, a total of 6 overarching categories emerged......: contextualization, social and political aspects, rethinking practice, complexity and uncertainty, actuality of projects and broader conceptualization. These categories cover a broad range of different contributions with diverse and alternative perspectives on project management. The early RPM literature dates back...

  7. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    Science.gov (United States)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  8. Review of interventional procedures in the very low birth-weight infant (<1.5 kg): complications, lessons learned and current practice

    Energy Technology Data Exchange (ETDEWEB)

    Laffan, Eoghan E. [Children' s Hospital of Eastern Ontario, Department of Diagnostic Imaging, Ottawa, ON (Canada); McNamara, Patrick J.; Whyte, Hilary; L' Herault, Johanne [The Hospital for Sick Children, Division of Neonatology, Toronto, ON (Canada); Amaral, Joao; Temple, Michael; John, Philip; Connolly, Bairbre L. [The Hospital for Sick Children, The Image-Guided Therapy Unit, Toronto, ON (Canada)

    2009-08-15

    Interventional radiology (IR) procedures in very low birth-weight (VLBW) infants (<1.5 kg) are challenging due to size, immaturity, comorbidities and lack of devices of suitable size. Infants are moved from the neonatal intensive care unit to the IR suite, further exposing them to risk. Our purpose was to review our experience of interventional procedures in VLBW infants, specifically complications and potential risks. VLBW infants referred for image-guided therapy between 1998 and 2005 were identified and medical records reviewed. ''Complications'' were divided into: major or minor, periprocedural or postprocedural, and intervention-/device-related, patient-related or equipment-related. Transport risk index of physiological stability (TRIPS) scores were calculated. A total of 116 infants (68 male, 48 female) underwent 176 procedures (159 vascular access-related and 17 nonvascular). Of 158 complications identified, 116 were major and 42 were minor. Major complications included hypothermia (n=33), line manipulations/removals (n=25), bleeding (n=12), thrombosis (n=4), cardiac arrest (n=3), tamponade (n=2), and multiorgan failure (n=1). Of the complications, 119 were categorized as intervention-/device-related, 32 patient-related and 7 equipment-related. There were no significant differences between pre- and postprocedural TRIPS scores. Successful completion of IR procedures in the VLBW infant is possible, but complications still occur in these fragile infants. (orig.)

  9. 21 CFR 56.110 - Expedited review procedures for certain kinds of research involving no more than minimal risk...

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Expedited review procedures for certain kinds of research involving no more than minimal risk, and for minor changes in approved research. 56.110 Section 56.110 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL...

  10. A new procedure for implementing a geological disposal

    International Nuclear Information System (INIS)

    Anon.

    2014-01-01

    The British government has launched a new procedure for selecting and implementing a geological disposal. This procedure is based on long-term cooperation with municipalities that wish to home this facility. In a preliminary 2 year long step, a national geological survey will be performed in order to determine regions that are suitable to home a geological disposal. Then discussions between municipalities that are voluntary and the enterprise in charge of developing the project will begin. Municipalities will receive an investment up to 1 million pounds a year in the first years of the selecting procedure and then 2.5 million pounds a year when discussions become more formal. British authorities consider that the procedure for selecting a site may last up to 20 years. A previous attempt to find a site failed in 2013 when 2 regions that had been interested in the project since 2008, were finally rebuffed by the regional council that opposed the project. Scotland and Wales have their own strategy for the management of radioactive waste. (A.C.)

  11. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  12. Integrated System Validation Usability Questionnaire: Computerized Procedures; Desarrollo del Cuestionario de Facilidad de Uso para la Validación de Sistemas Integrados: Procedimientos de Operacion

    Energy Technology Data Exchange (ETDEWEB)

    Garcés, Ma. I.; Torralba, B.

    2015-07-01

    The Research and Development (R&D) project on “Theoretical and Methodological Approaches to Integrated System Validation of Control Rooms, 2014-2015”, in which the research activities described in this report are framed, has two main objectives: to develop the items for an usability methodology conceived as a part of the measurement framework for performance-based control room evaluation that the OECD Halden Reactor Project will test in the experiments planned for 2015; and the statistical analysis of the data generated in the experimental activities of the Halden Man-Machine Laboratory (HAMMLAB) facility, with previous usability questionnaires, in 2010 and 2011. In this report, the procedure designed to meet the first goal of the project is described, in particular, the process followed to identify the items related to operating procedures, both computer and paper-based, one of the elements to be included in the usability questionnaire. Three phases are performed, in the first one, the approaches developed by the United States Nuclear Regulatory Commission, NRC, are reviewed, the models used by the nuclear industry and their technical support organizations, mainly, the Electric Power Research Institute, EPRI, are analyzed, and scientist advances are also explored. In the remaining stages, general and specific guidelines for computerized and paper-based procedures are compared and criteria for the preliminary selection of the items that should be incorporated into the usability questionnaire are defined. This proposal will be reviewed and adapted by the Halden Reactor Project to the design of the specific experiments performed in HAMLAB.

  13. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  14. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  15. The Great Bear Flare Pit Project : review of work to date

    International Nuclear Information System (INIS)

    Ridal, J.; Lean, D.; Findlay, S.C.

    1998-01-01

    Published information regarding potential toxic agents associated with flare emissions and a study to determine the risk posed to Treaty 8 First Nations (T8FN) peoples and wildlife was reviewed as part of the Great Bear Flare Pit Project (GBFPP). The project is concerned with the study of water and soil contamination in the immediate vicinity of flare pits in the Del Rio, Doig basin, Blueberry River, and Halfway River regions of T8FN lands in Alberta. The GBFPP has established good baseline data on metal contamination, and other contaminants such as benzene, toluene, ethylbenzene, xylenes (BTEX) and polycyclic aromatic hydrocarbons (PAHs) in the immediate vicinity of selected flare pits. Based on a critical assessment of reports published to date a series of prioritized recommendations for further research are made. 18 refs., 2 tabs

  16. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  17. A review of simple multiple criteria decision making analytic procedures which are implementable on spreadsheet packages

    Directory of Open Access Journals (Sweden)

    T.J. Stewart

    2003-12-01

    Full Text Available A number of modern multi-criteria decision making aids for the discrete choice problem, are reviewed, with particular emphasis on those which can be implemented on standard commercial spreadsheet packages. Three broad classes of procedures are discussed, namely the analytic hierarchy process, reference point methods, and outranking methods. The broad principles are summarised in a consistent framework, and on a spreadsheet. LOTUS spreadsheets implementing these are available from the author.

  18. Core Competencies or a Competent Core? A Scoping Review and Realist Synthesis of Invasive Bedside Procedural Skills Training in Internal Medicine.

    Science.gov (United States)

    Brydges, Ryan; Stroud, Lynfa; Wong, Brian M; Holmboe, Eric S; Imrie, Kevin; Hatala, Rose

    2017-11-01

    Invasive bedside procedures are core competencies for internal medicine, yet no formal training guidelines exist. The authors conducted a scoping review and realist synthesis to characterize current training for lumbar puncture, arthrocentesis, paracentesis, thoracentesis, and central venous catheterization. They aimed to collate how educators justify using specific interventions, establish which interventions have the best evidence, and offer directions for future research and training. The authors systematically searched Medline, Embase, the Cochrane Library, and ERIC through April 2015. Studies were screened in three phases; all reviews were performed independently and in duplicate. The authors extracted information on learner and patient demographics, study design and methodological quality, and details of training interventions and measured outcomes. A three-step realist synthesis was performed to synthesize findings on each study's context, mechanism, and outcome, and to identify a foundational training model. From an initial 6,671 studies, 149 studies were further reduced to 67 (45%) reporting sufficient information for realist synthesis. Analysis yielded four types of procedural skills training interventions. There was relative consistency across contexts and significant differences in mechanisms and outcomes across the four intervention types. The medical procedural service was identified as an adaptable foundational training model. The observed heterogeneity in procedural skills training implies that programs are not consistently developing residents who are competent in core procedures. The findings suggest that researchers in education and quality improvement will need to collaborate to design training that develops a "competent core" of proceduralists using simulation and clinical rotations.

  19. Review on patients radiation dose and frequency of procedures during medical exposure in Sudan

    International Nuclear Information System (INIS)

    Abu Baker, Samah Mohamed Nasr

    2015-09-01

    The aim of this study was to estimate patient dose, the annual frequency and the number of staff and devices in the medical applications of ionizing radiation in Sudan. Survey was conducted on diagnostic radiology, nuclear medicine and radiotherapy. With respect to diagnostic radiology, only patient radiation dose was estimated. The data for diagnostic radiology was obtained from 24 peer reviewed scientific published literatures during the years ( 2006 - 2015). The collected publications included about 64 Sudanese hospitals covering different types of diagnostic exams. A values of the effective dose for pediatrics and adult patients were within the ranges of similar worldwide values published by UNSCEAR report in 2008 with exceptional to fluoroscopy hysterosalpingography for adult patients. For nuclear medicine procedures, questionnaires were distributed to five hospitals representing the whole existing NM department in Sudan at the time of of study. The estimated total annual frequency of diagnostic procedures was 0.2 per 1000 population. The estimated total annual collective and annual per caput effective dose from all NM procedures were 16.268 man Sv and 0.5 μSv, respectively. Comparing the annual per caput effective dose with UNSCEAR value our results was less than the worldwide value and greater than the value for heath care level 111-1 v countries. Questionnaires were also distributed to collect data on radiotherapy procedures performed in the two existing radioisotopes Sudanese hospitals. The prescribed dose and the number of fractions were comparable between the two hospitals. The minimum prescribed dose was 20 Gy with 5 fractions for nasopharynx (NPH) palliative and the maximum prescribed dose was 64 Gy with 32 fractions for prostate.(Author)

  20. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell's viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell's viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project

  1. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-09

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell`s viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell`s viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project.

  2. Review of the groundwater flow modelling of the Swiss Project Gewaehr

    International Nuclear Information System (INIS)

    Robinson, P.C.; Jackson, C.P.; Herbert, A.W.; Atkinson, R.

    1986-02-01

    The authors review the hydrogeological modelling work undertaken by NAGRA (National Co-operative for the Storage of Radioactive Waste) for Project Gewahr (Guarantee). The FEM301 computer code that was used by NAGRA, their general approach to flow simulation and the specific finite-element models employed are all discussed; and the results of a verification are presented using the authors' own computer code NAMMU. Recommendations for improvements in the NAGRA modelling and for areas of future work are made. (author)

  3. Information and Communications Technologies Health Projects in Panama: A Systematic Review and their Relation with Public Policies.

    Science.gov (United States)

    Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel

    2017-07-01

    This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.

  4. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  5. Focal relationships and the environment of project marketing. A literature review with suggestions for practitioners and future research

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki

    2000-01-01

    of the review is upon the connection between focal relationships and the wider environment in which project marketing and systems selling takes place. First, several common definitions of projects and project marketing are presented and discussed. Second, the implications of three specific features of project......Project marketing is an important mode of business-to-business marketing today. This paper assesses recent project marketing contributions, including predominantly those of members of the (mainly European) International Network for Project Marketing and Systems Selling (INPM). The emphasis...... business - discontinuity, uniqueness, and complexity - for the focal relationship and the broader marketing environment are considered at the level of multiple projects. Third, three overlapping types of postures that project-selling firms can adopt in relation to their focal relationships...

  6. Operational procedures - industry observations and opportunities for improvement

    International Nuclear Information System (INIS)

    Davey, E.

    2003-01-01

    The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, discusses the extent of human performance related problems attributed to procedure deficiencies, reviews commonly encountered problems with design and implementation of procedures, and offers suggestions on how some of these issues might be addressed in the future. (author)

  7. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  8. "Non-filling" procedures for lip augmentation: a systematic review of contemporary techniques and their outcomes.

    Science.gov (United States)

    Moragas, Joan San Miguel; Vercruysse, Herman Junior; Mommaerts, Maurice Y

    2014-09-01

    Ideal lip augmentation techniques have good longevity, low complication rates, and optimal functional and aesthetic results. No systematic review is currently available regarding the efficacy of lip augmentation techniques. This review will focus only on non-filling procedures for lip augmentation (NFPLAs). Current databases Elsevier Science Direct, PubMed, HighWire Press, Springer Standard Collection, SAGE, DOAJ, Sweetswise, Free E-Journals, Ovid Lippincott Williams & Wilkins, Willey Online Library Journals and Cochrane Plus were scrutinized and relevant article reference sections were studied for additional publications. The search heading sequence used was ("Lip" or "Mouth" or "Perioral" or "Nasolabial") and ("Augmentation" or "Enhancement" or "Surgery" or "Lift" or "V-Y" or "Corner"). Exclusion criteria applied to 6436 initial keyword-search retrievals yielded 12 articles. Eight more articles were retrieved from reference sections, for a total of 18 papers assessed. Only one article made a direct comparison of efficacy between two surgical techniques for lip augmentation, and none directly compared complications associated with different NFPLAs. Although this systematic review revealed a lack of quality data in comparing the efficacy and complications among different NFPLAs, it is important to review and pool the existing studies to better suggest proper treatment to patients. Copyright © 2014 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  9. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  10. Project W-320, WRSS PCP: Procedure implementation verification

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List

  11. Interventions for Echolalic Behaviour for Children with Autism: A Review of Verbal Prompts and the Cues Pause Point Procedure.

    Science.gov (United States)

    Kavon, Nicole M.; McLaughlin, T. F.

    1995-01-01

    This paper examines behavior interventions for echolalic behavior in children with autism, including verbal prompting (focusing on the echolalic behavior itself) and the cues-pause-point procedure (which employs the child's prerequisite skills to teach correct verbal responses). A review of the literature indicated that both techniques were…

  12. Quality Assurance Program: Argonne peer review activities for the salt host-rock portion of the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Edgar, D.E.

    1986-01-01

    This Quality Assurance (QA) Program sets forth the methods, controls, and procedures used to ensure that the results of Argonne National Laboratory's peer review activities are consistently of the highest quality and responsive to Salt Repository Project Office's needs and directives. Implementation of the QA procedures described herein establishes an operational framework so that task activities are traceable and the activities and decisions that influence the overall quality of the peer review process and results are fully documented. 56 refs., 5 figs., 6 tabs

  13. Effect of music in endoscopy procedures: systematic review and meta-analysis of randomized controlled trials.

    Science.gov (United States)

    Wang, Man Cai; Zhang, Ling Yi; Zhang, Yu Long; Zhang, Ya Wu; Xu, Xiao Dong; Zhang, You Cheng

    2014-10-01

    Endoscopies are common clinical examinations that are somewhat painful and even cause fear and anxiety for patients. We performed this systematic review and meta-analysis of randomized controlled trials to determine the effect of music on patients undergoing various endoscopic procedures. We searched the Cochrane Library, Issue 6, 2013, PubMed, and EMBASE databases up to July 2013. Randomized controlled trials comparing endoscopies, with and without the use of music, were included. Two authors independently abstracted data and assessed risk of bias. Subgroup analyses were performed to examine the impact of music on different types of endoscopic procedures. Twenty-one randomized controlled trials involving 2,134 patients were included. The overall effect of music on patients undergoing a variety of endoscopic procedures significantly improved pain score (weighted mean difference [WMD] = -1.53, 95% confidence interval [CI] [-2.53, -0.53]), anxiety (WMD = -6.04, 95% CI [-9.61, -2.48]), heart rate (P = 0.01), arterial pressure (P music group, compared with the control group. Furthermore, music had little effect for patients undergoing colposcopy and bronchoscopy in the subanalysis. Our meta-analysis suggested that music may offer benefits for patients undergoing endoscopy, except in colposcopy and bronchoscopy. Wiley Periodicals, Inc.

  14. Chronic subdural hematoma: a systematic review and meta-analysis of surgical procedures.

    Science.gov (United States)

    Liu, Weiming; Bakker, Nicolaas A; Groen, Rob J M

    2014-09-01

    In this paper the authors systematically evaluate the results of different surgical procedures for chronic subdural hematoma (CSDH). The MEDLINE, Embase, Cochrane Central Register of Controlled Trials, and other databases were scrutinized according to the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analysis) statement, after which only randomized controlled trials (RCTs) and quasi-RCTs were included. At least 2 different neurosurgical procedures in the management of chronic subdural hematoma (CSDH) had to be evaluated. Included studies were assessed for the risk of bias. Recurrence rates, complications, and outcome including mortality were taken as outcome measures. Statistical heterogeneity in each meta-analysis was assessed using the T(2) (tau-squared), I(2), and chi-square tests. The DerSimonian-Laird method was used to calculate the summary estimates using the fixed-effect model in meta-analysis. Of the 297 studies identified, 19 RCTs were included. Of them, 7 studies evaluated the use of postoperative drainage, of which the meta-analysis showed a pooled OR of 0.36 (95% CI 0.21-0.60; p < 0.001) in favor of drainage. Four studies compared twist drill and bur hole procedures. No significant differences between the 2 methods were present, but heterogeneity was considered to be significant. Three studies directly compared the use of irrigation before drainage. A fixed-effects meta-analysis showed a pooled OR of 0.49 (95% CI 0.21-1.14; p = 0.10) in favor of irrigation. Two studies evaluated postoperative posture. The available data did not reveal a significant advantage in favor of the postoperative supine posture. Regarding positioning of the catheter used for drainage, it was shown that a frontal catheter led to a better outcome. One study compared duration of drainage, showing that 48 hours of drainage was as effective as 96 hours of drainage. Postoperative drainage has the advantage of reducing recurrence without increasing complications

  15. Electronic Procedures for Medical Operations

    Science.gov (United States)

    2015-01-01

    Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

  16. A review of hot climate concreting, and the appropriate procedures for ordinary jobsites in developing countries

    Directory of Open Access Journals (Sweden)

    Bella Nabil

    2017-01-01

    Full Text Available Hot weather concreting involves some procedures to reduce negative effects caused principally by excessive water evaporation from the concrete surface. Potential problems for fresh concrete are: increased demand for water, increased the tendency the rate of slump loss corresponding to add water on job-site, an increased in execution rate, increased tendency for plastic shrinkage cracking and increased difficulty in controlling occluded air. Potential problems for hardened concrete may include: reduction of resistance at 28 days and long-term resulting of higher water demand and/or higher temperature of concrete, decreased durability resulting from cracking. Most developing countries have hot climate, ordinary jobsites in developing countries are characterised by reduced of human resources, equipment and infrastructures. This paper briefly reviews hot climate concreting procedures, especially the latest research in developing countries, and discusses the most appropriate in developing countries.

  17. Sharing programming resources between Bio* projects through remote procedure call and native call stack strategies

    DEFF Research Database (Denmark)

    Prins, Pjotr; Goto, Naohisa; Yates, Andrew

    2012-01-01

    Open-source software (OSS) encourages computer programmers to reuse software components written by others. In evolutionary bioinformatics, OSS comes in a broad range of programming languages, including C/C++, Perl, Python, Ruby, Java, and R. To avoid writing the same functionality multiple times...... for different languages, it is possible to share components by bridging computer languages and Bio* projects, such as BioPerl, Biopython, BioRuby, BioJava, and R/Bioconductor. In this chapter, we compare the two principal approaches for sharing software between different programming languages: either by remote...... procedure call (RPC) or by sharing a local call stack. RPC provides a language-independent protocol over a network interface; examples are RSOAP and Rserve. The local call stack provides a between-language mapping not over the network interface, but directly in computer memory; examples are R bindings, RPy...

  18. Making Infrastructure Work for Women and Men : A Review of World Bank Infrastructure Projects (1995-2009)

    OpenAIRE

    World Bank

    2010-01-01

    This report provides a gender review of a decade and a half of World Bank infrastructure lending for 1,246 projects. The objective of this review is to assess the status of and trends in gender integration in the World Bank infrastructure portfolio, and to establish a baseline for monitoring and enhancing gender integration in line with commitments made for the 2006 gender action plan. The ...

  19. "Heidelberg standard examination" and "Heidelberg standard procedures" - Development of faculty-wide standards for physical examination techniques and clinical procedures in undergraduate medical education.

    Science.gov (United States)

    Nikendei, C; Ganschow, P; Groener, J B; Huwendiek, S; Köchel, A; Köhl-Hackert, N; Pjontek, R; Rodrian, J; Scheibe, F; Stadler, A-K; Steiner, T; Stiepak, J; Tabatabai, J; Utz, A; Kadmon, M

    2016-01-01

    The competent physical examination of patients and the safe and professional implementation of clinical procedures constitute essential components of medical practice in nearly all areas of medicine. The central objective of the projects "Heidelberg standard examination" and "Heidelberg standard procedures", which were initiated by students, was to establish uniform interdisciplinary standards for physical examination and clinical procedures, and to distribute them in coordination with all clinical disciplines at the Heidelberg University Hospital. The presented project report illuminates the background of the initiative and its methodological implementation. Moreover, it describes the multimedia documentation in the form of pocketbooks and a multimedia internet-based platform, as well as the integration into the curriculum. The project presentation aims to provide orientation and action guidelines to facilitate similar processes in other faculties.

  20. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  1. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  2. Cytological preparations for molecular analysis: A review of technical procedures, advantages and limitations for referring samples for testing.

    Science.gov (United States)

    da Cunha Santos, G; Saieg, M A; Troncone, G; Zeppa, P

    2018-04-01

    Minimally invasive procedures such as endobronchial ultrasound-guided transbronchial needle aspiration (EBUS-TBNA) must yield not only good quality and quantity of material for morphological assessment, but also an adequate sample for analysis of molecular markers to guide patients to appropriate targeted therapies. In this context, cytopathologists worldwide should be familiar with minimum requirements for refereeing cytological samples for testing. The present manuscript is a review with comprehensive description of the content of the workshop entitled Cytological preparations for molecular analysis: pre-analytical issues for EBUS TBNA, presented at the 40th European Congress of Cytopathology in Liverpool, UK. The present review emphasises the advantages and limitations of different types of cytology substrates used for molecular analysis such as archival smears, liquid-based preparations, archival cytospin preparations and FTA (Flinders Technology Associates) cards, as well as their technical requirements/features. These various types of cytological specimens can be successfully used for an extensive array of molecular studies, but the quality and quantity of extracted nucleic acids rely directly on adequate pre-analytical assessment of those samples. In this setting, cytopathologists must not only be familiar with the different types of specimens and associated technical procedures, but also correctly handle the material provided by minimally invasive procedures, ensuring that there is sufficient amount of material for a precise diagnosis and correct management of the patient through personalised care. © 2018 John Wiley & Sons Ltd.

  3. 75 FR 36357 - Clarification on the Procedure for Seeking Review of a Finding of a Substantial New Question of...

    Science.gov (United States)

    2010-06-25

    ... delegate that authority to the panel of Administrative Patent Judges who are deciding the appeal in an ex... delegate this SNQ review authority to the panel of Administrative Patent Judges who are deciding the appeal... a SNQ determination are procedural, the Chief Judge of the Board of Patent Appeals and Interferences...

  4. Review of cause-based decision tree approach for the development of domestic standard human reliability analysis procedure in low power/shutdown operation probabilistic safety assessment

    International Nuclear Information System (INIS)

    Kang, D. I.; Jung, W. D.

    2003-01-01

    We review the Cause-Based Decision Tree (CBDT) approach to decide whether we incorporate it or not for the development of domestic standard Human Reliability Analysis (HRA) procedure in low power/shutdown operation Probabilistic Safety Assessment (PSA). In this paper, we introduce the cause based decision tree approach, quantify human errors using it, and identify merits and demerits of it in comparision with previously used THERP. The review results show that it is difficult to incorporate the CBDT method for the development of domestic standard HRA procedure in low power/shutdown PSA because the CBDT method need for the subjective judgment of HRA analyst like as THERP. However, it is expected that the incorporation of the CBDT method into the development of domestic standard HRA procedure only for the comparision of quantitative HRA results will relieve the burden of development of detailed HRA procedure and will help maintain consistent quantitative HRA results

  5. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  6. The evolution of a doctor of nursing practice capstone process: programmatic revisions to improve the quality of student projects.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Raterink, Ginger

    2013-01-01

    The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.

  7. Minimally invasive aesthetic procedures in young adults

    OpenAIRE

    Wollina, Uwe; Goldman, Alberto

    2011-01-01

    Uwe Wollina1, Alberto Goldman21Department of Dermatology and Allergology, Academic Teaching Hospital Dresden-Friedrichstadt, Dresden, Germany; 2Clinica Goldman, Porto Alegre, Rio Grande du Sul, BrazilAbstract: Age is a significant factor in modifying specific needs when it comes to medical aesthetic procedures. In this review we will focus on young adults in their third decade of life and review minimally invasive aesthetic procedures other than cosmetics and cosmeceuticals. Correction of asy...

  8. Overview and Evaluation of the NESC Projects for Fracture Assessments of Nuclear Components

    International Nuclear Information System (INIS)

    Sattari-Far, Iradj; Lorentzon, Mikael

    2011-02-01

    The overall objective of the NESC network has been to examine the reliability of the entire process of structural integrity assessment within an international framework. Within this network, six projects were conducted under the period of 1993-2008. The main targets of these projects were: NESC-I: This project evaluated the interactions among various technical disciplines applied to the integrity assessment of a large-scale thermally shocked spinning cylinder experiment. The cylinder test was designed to simulate selected conditions associated with an ageing flawed reactor pressure vessel. NESC-II: This project was on brittle crack initiation, propagation and arrest of shallow cracks in clad vessels under PTS loading. The results of this project underlined the conservatism of existing defects assessment procedures for shallow RPV flaws. NESC-III: This project was to quantify the accuracy of structural integrity assessment procedures for defects in dissimilar welds. The project was built around the conducted ADIMEW-project to share its overall objectives and to provide additional input. NESC-IV: This project was an experimental/analytical program to develop validated analysis methods for transferring fracture toughness data generated on standard test specimens to shallow flaws in reactor pressure vessel welds subject to biaxial loading in the lower-transition temperature region. NESC-V: This project aimed to develop a European multi-level procedure for handling of thermal fatigue phenomena in the nuclear power plant components. It also aimed to create a database of service and mock-up data for better understanding of thermal fatigue damage mechanisms. NESC-VI: This project was an extension of the NESC-IV project. Embedded subclad racks in beam specimens under uniaxial loading were studied to study the transferability of fracture toughness data between different crack configurations. This report gives an overview report of these six NESC projects. The reports cover

  9. 45 CFR 1355.33 - Procedures for the review.

    Science.gov (United States)

    2010-10-01

    ... review. (a) The full child and family services reviews will: (1) Consist of a two-phase process that... include children who entered foster care during the year under review. In-home cases must be drawn... information by the State; or (2) ACF and the State will review additional cases using only those indicators in...

  10. Procedures minimally invasive image-guided

    International Nuclear Information System (INIS)

    Mora Guevara, Alejandro

    2011-01-01

    A literature review focused on minimally invasive procedures, has been performed at the Department of Radiology at the Hospital Calderon Guardia. A multidisciplinary team has been raised for decision making. The materials, possible complications and the available imaging technique such as ultrasound, computed tomography, magnetic resonance imaging, have been determined according to the procedure to be performed. The revision has supported medical interventions didactically enjoying the best materials, resources and conditions for a successful implementation of procedures and results [es

  11. Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan

    Energy Technology Data Exchange (ETDEWEB)

    Stringfellow, William T.

    2005-05-13

    A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

  12. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project.

    Science.gov (United States)

    Patterson, P Daniel; Higgins, J Stephen; Weiss, Patricia M; Lang, Eddy; Martin-Gill, Christian

    2018-02-15

    Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available evidence, and rate the quality of that evidence for purposes of producing an Evidence Based Guideline (EBG) for fatigue risk management in EMS operations. We completed seven systematic reviews that involved searches of six databases for literature relevant to seven research questions. These questions were developed a priori by an expert panel and framed in the Population, Intervention, Comparison, and Outcome (PICO) format and pre-registered with PROSPERO. Our target population was defined as persons 18 years of age and older classified as EMS personnel or similar shift worker groups. A panel of experts selected outcomes for each PICO question as prescribed by the Grading of Recommendations, Assessment, Development, and Evaluation (GRADE) methodology. We pooled findings, stratified by study design (experimental vs. observational) and presented results of each systematic review in narrative and quantitative form. We used meta-analyses of select outcomes to generate pooled effects. We used the GRADE methodology and the GRADEpro software to designate a quality of evidence rating for each outcome. We present the results for each systematic review in accordance with the Preferred Reporting Items for Systematic reviews and Meta-Analyses (PRISMA). More than 38,000 records were screened across seven systematic reviews. The median, minimum, and maximum inter-rater agreements (Kappa) between screeners for our seven systematic reviews were 0.66, 0.49, and 0.88, respectively. The median, minimum, and maximum number of records retained for the seven systematic reviews was 13, 1, and 100, respectively. We present key findings in GRADE Evidence Profile Tables in separate publications for each systematic review. We describe a protocol for

  13. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature (reprint)

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2016-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  14. Review projects for the US Fusion Program: Progress report, December 1, 1984-February 28, 1987

    International Nuclear Information System (INIS)

    Ribe, F.L.

    1988-01-01

    This paper reviews projects at the University of Washington on the following topics: Magnetic Fusion Energy Program Plan (Feb. 1985); High Density Power Systems; Fusion Systems Studies; Burning Plasmas and Compact Ignition Tokamak; US Magnetic Mirror Program; and Technical Planning Activity (Jan. 1987)

  15. Procedure Redesign Methods : E3-Control: a redesign methodology for control procedures

    NARCIS (Netherlands)

    Liu, J.; Hofman, W.J.; Tan, Y.H.

    2011-01-01

    This chapter highlights the core research methodology, e3-control, that is applied throughout the ITAIDE project for the purpose of control procedure redesign. We present the key concept of the e3-control methodology and its technical guidelines. Based on the output of this chapter, domain experts

  16. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  17. In-Office Endoscopic Laryngeal Laser Procedures: A Patient Safety Initiative.

    Science.gov (United States)

    Anderson, Jennifer; Bensoussan, Yael; Townsley, Richard; Kell, Erika

    2018-05-01

    Objective To review complications of in-office endoscopic laryngeal laser procedures after implementation of standardized safety protocol. Methods A retrospective review was conducted of the first 2 years of in-office laser procedures at St Michaels Hospital after the introduction of a standardized safety protocol. The protocol included patient screening, procedure checklist with standardized reporting of processes, medications, and complications. Primary outcomes measured were complication rates of in-office laryngeal laser procedures. Secondary outcomes included hemodynamic changes, local anesthetic dose, laser settings, total laser/procedure time, and incidence of sedation. Results A total of 145 in-office KTP procedures performed on 65 patients were reviewed. In 98% of cases, the safety protocol was fully implemented. The overall complication rate was 4.8%. No major complications were encountered. Minor complications included vasovagal episodes and patient intolerance. The rate of patient intolerance resulting early termination of anticipated procedure was 13.1%. Total local anesthetic dose averaged 172.9 mg lidocaine per procedure. The mean amount of laser energy dispersed was 261.2 J, with mean total procedure time of 48.3 minutes. Sixteen percent of patients had preprocedure sedation. Vital signs were found to vary modestly. Systolic blood pressure was lower postprocedure in 13.8% and symptomatic in 4.1%. Discussion The review of our standardized safety protocol has revealed that in-office laser treatment for laryngeal pathology has extremely low complication rates with safe patient outcomes. Implications for Practice The trend of shifting procedures out of the operating room into the office/clinic setting requires new processes designed to promote patient safety.

  18. Chest-wall thickness and percent thoracic fat estimation by B-mode ultrasound: system and procedure review

    International Nuclear Information System (INIS)

    Berger, C.D.; Lane, B.H.; Dunsmore, M.R.

    1983-02-01

    Accurate measurement of chest wall thickness is necessary for estimation of lung burden of transuranic elements in humans. To achieve tis capability, the ORNL Whole Body Counter has acquired a B-mode ultrasonic imaging system for defining the structure within the thorax of the body. This report contains a review of the ultrasound system in use at the ORNL Whole Body Counter, including its theory of operation, and te procedure for use of the system. Future developmental plans are also presented

  19. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  20. 12 CFR 907.12 - Finance Board procedures.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Finance Board procedures. 907.12 Section 907.12 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS PROCEDURES Case-by-Case Determinations; Review of Disputed Supervisory Determinations § 907.12 Finance Board procedures. (a) Notice of Receipt...

  1. 14 CFR 151.25 - Procedures: Application; information as to property interests.

    Science.gov (United States)

    2010-01-01

    ... time it submits the application. In the case of a joint project, any one or more of the sponsors may... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Procedures: Application; information as to... Development Projects § 151.25 Procedures: Application; information as to property interests. (a) Each sponsor...

  2. Coal pillar design procedures

    CSIR Research Space (South Africa)

    York, G

    2000-03-01

    Full Text Available Final Project Report Coal pillar design procedures G. York, I. Canbulat, B.W. Jack Research agency: CSIR Mining Technology Project number: COL 337 Date: March 2000 2 Executive Summary Examination of collapsed pillar cases outside of the empirical... in strength occurs with increasing specimen size. 45 40 35 30 25 20 15 10 5 0 20 40 60 80 100 120 140 160 UNIAX IA L COMPR EHEN SIV E S TR ENG TH (M Pa ) CUBE SIZE (cm) Figure 1...

  3. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 2. Project Reviews G-P

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order

  4. Habitat Evaluation Procedures (HEP) Report; Tacoma Creek South Project, Technical Report 2003-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Tacoma Creek South property, an acquisition completed by the Kalispel Tribe of Indians in June 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Tacoma Creek South Project provides a total of 190.79 Habitat Units (HUs) for the species evaluated. Emergent wetlands provide 20.51 HUs for Canada goose, mallard, and muskrat. Grassland provides 1.65 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 11.76 HUs for mallard, yellow warbler, and white-tailed deer. Conifer forest habitat provides 139.92 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Deciduous forest also provides 19.15 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the Tacoma Creek South Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  5. The German and European laws and regulations providing for participation of the public in vertically staged procedures for the licensing of large-scale projects with an impact on the environment

    International Nuclear Information System (INIS)

    Hellmann, U.

    1992-01-01

    Participation of the public in licensing procedures for large-scale projects has been an item of discussion since the sixties in the legal sciences and on the political level. The introduction of the environmental impact assessment (EIA) as a legal requirement in EC law and its implementation in practice was the occasion to once again investigate the principle of participation of the public in the current legal framework. The study in hand reviews the legal provisions found in administrative law, constitutional law and European Community law governing the right of participation of the public and also takes a look at the situation in practice. The results show both the legal status and conditions of enforcement as prevailing after the coming into force in 1989 of the Act on Performance of an EIA, as well as inadequacies and deficits in the current legal framework. (orig.) [de

  6. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  7. Training readers at school: the educational project, the school library and the mediation

    Directory of Open Access Journals (Sweden)

    Rovilson José da Silva

    2015-09-01

    Full Text Available Introduction: Discusses the formation of readers in the first years of elementary school and proposes the integration between the school pedagogical project, teachers, reading practices and the school library. Objective: To analyze the basic assumptions to train readers in school. Methods: Bibliographic research based on a literature review on the subject. Results: Initial elements that may be used to structure readers-training projects at any schools are presented. Conclusion: Training readers at school consists in having procedures and pedagogical actions performed in combination with guided and free usage of the library, borrowing books and time to hear stories and talk about them.

  8. Educational Accounting Procedures.

    Science.gov (United States)

    Tidwell, Sam B.

    This chapter of "Principles of School Business Management" reviews the functions, procedures, and reports with which school business officials must be familiar in order to interpret and make decisions regarding the school district's financial position. Among the accounting functions discussed are financial management, internal auditing,…

  9. Civil Procedure in Cross-cultural Dialogue: Eurasia Context

    Directory of Open Access Journals (Sweden)

    Stefaan Voet

    2014-01-01

    Full Text Available Reviewed book: Civil Procedure in Cross-cultural Dialogue: Eurasia Context: IAPL World Conference on Civil Procedure, September 18–21, 2012, Moscow, Russia (Dmitry Maleshin, ed. (Statut 2012, available at (accessed March 9, 2014 [hereinafter Civil Procedure in Cross-cultural Dialogue: Eurasia Context].

  10. 77 FR 56698 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2012-09-13

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  11. 78 FR 66098 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2013-11-04

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  12. 75 FR 22892 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2010-04-30

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  13. 76 FR 59481 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2011-09-26

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  14. 77 FR 2603 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2012-01-18

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  15. 78 FR 2711 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2013-01-14

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  16. 76 FR 27168 - Air Traffic Procedures Advisory Committee

    Science.gov (United States)

    2011-05-10

    ...The FAA is issuing this notice to advise the public that a meeting of the Federal Aviation Administration Air Traffic Procedures Advisory Committee (ATPAC) will be held to review present air traffic control procedures and practices for standardization, revision, clarification, and upgrading of terminology and procedures.

  17. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  18. Human Reliability Analysis For Computerized Procedures

    International Nuclear Information System (INIS)

    Boring, Ronald L.; Gertman, David I.; Le Blanc, Katya

    2011-01-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  19. Review of CERN Data Centre Infrastructure

    International Nuclear Information System (INIS)

    Andrade, P; Bell, T; Van Eldik, J; McCance, G; Panzer-Steindel, B; Coelho dos Santos, M; Traylen and, S; Schwickerath, U

    2012-01-01

    The CERN Data Centre is reviewing strategies for optimizing the use of the existing infrastructure and expanding to a new data centre by studying how other large sites are being operated. Over the past six months, CERN has been investigating modern and widely-used tools and procedures used for virtualisation, clouds and fabric management in order to reduce operational effort, increase agility and support unattended remote data centres. This paper gives the details on the project's motivations, current status and areas for future investigation.

  20. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...